Lessons Learned US 36 Express Lanes CDOT Project No. NH0361-093 17516|18194|18195 June 2016 Colorado Department of Transportation US 36 Express Lanes Project 500 Eldorado Blvd., Suite 2301 Broomfield, CO 80021

Transcript of Lessons Learned - Colorado Department of Transportation

                         

 

Lessons Learned US 36 Express Lanes

CDOT Project No. NH0361-093 17516|18194|18195

June 2016

Colorado Department of Transportation US 36 Express Lanes Project

500 Eldorado Blvd., Suite 2301 Broomfield, CO 80021

US 36 ExLessons  

Final: Jun

Introduct

Lessons L

US 36 Ex

US 36 Ex

US 36 Ph

Disadv

Docum

Draina

Earthw

Enviro

Intellig

Landsc

Mainte

Mainte

Modifi

Partne

Project

Project

Procur

Public

Quality

Right o

RTD C

Signing

Structu

Survey

Third-P

Utility

Acronym

 

 

xpress LaneLearned Re

ne 2016

tion ..............

Learned Ove

xpress Lanes

xpress Lanes

hase 1 Lesson

vantaged Bus

ment Control

age ................

work, Geotec

onmental ......

gent Transpo

caping and Ir

enance Durin

enance of Tra

ications to St

r Coordinati

t Controls/Sc

t/Contract M

rement/Evalu

Information

y Manageme

of Way .........

Coordination

g, Striping, S

ures ..............

y ....................

Party Agreem

Relocations

m List ............

es Project eport

.....................

erview ..........

Project Back

Project Less

ns Learned ...

siness Enterp

.....................

.....................

chnical, and P

.....................

ortation Syste

rrigation .....

ng Construct

affic (MOT)

tandard Spec

ion (CDOT a

cheduling ....

Management

uation/Select

n ....................

ent ................

.....................

....................

Signals, and L

.....................

.....................

ments ..........

.....................

.....................

Table

.....................

.....................

kground and

sons Learned

.....................

prises (DBE)

.....................

.....................

Pavements ...

.....................

em and Elect

.....................

tion ...............

.....................

cifications ....

and Contract

.....................

.....................

tion Phase ....

.....................

.....................

.....................

.....................

Lighting ......

.....................

.....................

.....................

.....................

.....................

e of Conten

......................

......................

d Overview ..

d – Master C

......................

and Workfo

......................

......................

......................

......................

tronic Toll C

......................

......................

......................

......................

tor) ...............

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

nts

.....................

.....................

.....................

Contact List .

.....................

orce Develop

.....................

.....................

.....................

.....................

Collection .....

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

pment ............

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

2

....... 3 

....... 3 

....... 3 

....... 7 

....... 8 

....... 8 

....... 9 

..... 11 

..... 13 

..... 14 

..... 18 

..... 21 

..... 22 

..... 23 

..... 26 

..... 26 

..... 27 

..... 29 

..... 31 

..... 33 

..... 35 

..... 38 

..... 39 

..... 42 

..... 43 

..... 46 

..... 46 

..... 47 

..... 49 

US 36 ExLessons  

Final: Jun

Any projexperiencincludes Coloradolocal jurilearning own lessoa $317M

After thebest pracand projeconstructLessons LPertinent

Lessons Lthat are sareas for

Effectivelessons lethe remai

The US 3part of a Alternaticleared pidentifiedUS 36 RO

The US 3an expresLouisvillTransit (Bcommutefor tollinRTD.

xpress LaneLearned Re

ne 2016

ect the size ces. The USmultiple fun

o Departmenisdictions – wfrom past prons, which a

M design-buil

e initial year ctices, and coect phases artion of most Learned fromt additional l

Learned are shared to proimprovemen

e organizatioearned compining project

US 36

36 Corridor wFinal Enviro

ive for the coplanned imprd as “Phase IOD has been

36 Express Lss lane in eale/Superior. BRT) and toer bikeway, ag, transit and

es Project eport

of the US 3636 Express

nding partnernt of Transpowhich adds tractices. Eacare captured ld project an

of constructontinue to bure completedof the Phase

m the Phase lessons from

L

general statomote repeatnt that are sh

ons use past epiled in the rt and on futu

6 Express L

was the subjonmental Imorridor. A Rerovements frI” of the FEIn separated i

Lanes Phase ch direction The lanes w

olled vehicleadd BRT imd traveler in

Int

6 Express LaLanes Projers – High-Peortation (CDto the complch agency bri

in this repord Phase 2 is

tion, CDOT uild upon it ad. As of earlye 2 elements1 project, m

m Phase 2 hav

Lessons Le

ements that t applicationhared to prov

experience areport will beure CDOT p

Lanes Pro

ject of numempact Statem

ecord of Decrom Federal IS. For constinto two pha

1 Project is on US 36 fr

will accommos. In addition

mprovementsformation, a

roduction

anes Project ect is a $450erformance T

DOT), Regionlexities of things their unrt. The Projea $180M Pu

decided to bas Phase 1 coy 2016, Phass is also commany of whicve been adde

earned Ov

describe goo. They may vide continu

as a guide toe used as a trojects.

oject Back

erous studiesment (FEIS) e

cision (RODBoulevard ttruction, Pha

ases (Phase 1

a $317 millirom Federal odate High On, the projec, and install

and incident

n

has somethimillion, mu

Transportatinal Transpor

he project, asnique expertiect is brokenublic Private

begin documonstruction cse 1 is substa

mplete. This dch were appled though to

verview

od practices also be desc

uous improve

improve futtool for impr

kground an

s between 20effort. The F

D) was signedto Foothills Pase I of the P1 and Phase 2

ion, multi-mBoulevard t

Occupancy Vct will replacIntelligent Tmanagemen

ing to learn fulti-modal pron Enterprisrtation Distris well as the ise to the tea

n into two Phe Partnership

menting lessocontinues, Pantially comdocument folied to the Pho later versio

or innovativcriptions of cement.

ture performrovement on

nd Overvi

002 and 2009FEIS resultedd in DecembParkway in BPreferred Al2).

modal projectto 88th StreeVehicles (HOce several brTransportationt. It is led by

from its roject that se (HPTE), ict (RTD) animportance

am and has thases – Phasp (P3) projec

ons learned aPhase 2 beginmplete, and thocuses on thehase 2 projecons.

ve approachechallenges or

mance. The n construction

iew

9 conducted d in a Preferrber 2009 whBoulder, ternative in

t that will buet in OV), Bus Raridges, build on Systems (y CDOT and

3

nd of

their e 1 is ct.

and ns, he e ct.

es r

n of

as a red

hich

the

uild

apid a

(ITS) d

US 36 ExLessons  

Final: Jun

CDOT sethe Phasepublic in

Phase 2 oBoulder. and finanand I-25 same as fschedule

Phase 1

ABpv

Rsh

xpress LaneLearned Re

ne 2016

elected the Ae 1 project an July 2015.

of the US 36Plenary Roa

nce the PhaseExpress Lanfor the Phased to be comp

Project Ele

Add a buffer-Boulevard an

eople total inehicle;

Reconstruct ahoulders;

es Project eport

Ames Granitnd they bega

6 Express Laads Denver we 2 US 36 Enes for 50 yee 1 project. Cpleted by ear

ements

-separated exnd 88th Streetn the car), an

and widen th

e Joint Ventan constructi

anes Project iwas selectedxpress Laneears. The conConstructionrly 2016.

xpress lane it (See Figurend tolled veh

he highway t

Figure 1 ‐ P

ture (AGJV)ion in July 2

is extendingd in mid-201es. They willnstruction ann on Phase 2

in each direce 1) for BRThicles travell

to accommod

Phase 1 Location

) team as the2012. The m

g the express3 as the con

l also operatend design me

2 began in lat

ction of US 3T, with two oling with tw

date 12-foot

n Map

e design-builmanaged lane

s lanes to Tabncessionaire e and maintaembers of thte 2013 and

36 between For more pass

wo or less peo

t-wide inside

ld contractors opened to

ble Mesa in to design, buain the Phasehe team are tthe project i

Federal sengers (threople in the

e and outside

 

4

r for the

uild e 1, 2 the is

ee

e

US 36 ExLessons  

Final: Jun

RSN

WP

Apr

In

In

Impr

Phase 2

AFpv

RT

W

Rov

Win

Apr

In

In

Im

xpress LaneLearned Re

ne 2016

Replace the Wheridan Bou

Northern San

Widen the USromenade D

Add BRT impriority impro

nstall ITS fo

nstall a separ

mprove RTDrotection.

Project Elem

Add a buffer-oothills Parkeople total inehicle;

ReconstructinTable Mesa;

Widening the

Replacing thever South B

Widening thenterchange to

Adding BRT riority impro

nstalling ITS

nstalling a se

mproving the

es Project eport

Wadsworth Pulevard bridgnta Fe Railwa

S 36 bridgesDrive;

provements,ovements at

r tolling, tra

rate commut

D stations alo

ments

-separated exkway (See Fn the car), an

ng two gener

e highway to

e US 36 overoulder Creek

e McCaslin Bo a diverging

improvemenovements at

S for tolling,

eparate comm

e RTD statio

Parkway, Wages over US ay and Lowe

s over West F

, including nramps;

ansit and trav

ter bikeway

ong the corri

xpress lane iFigure 2) for nd tolled veh

ral purpose l

o accommoda

r Coal Creekk bridge;

Boulevard ovg diamond in

nts includingramps;

transit and t

muter bikew

on at McCas

adsworth Bo36, and the

ell Boulevar

Flatiron Cro

new electroni

veler informa

along much

idor, includi

in each direcBRT, HOV

hicles travell

lanes in each

ate 12-foot-w

k Bridge and

ver US 36 brnterchange;

g new electr

traveler info

way along the

slin Boulevar

oulevard (at US 36 bridg

rd;

ssing, East F

ic display si

ation and inc

h of the corrid

ing new cano

ction of US 3with two or

ling with tw

h direction b

wide inside a

d rehabilitati

ridge and rec

ronic display

ormation and

e rest of the

rd.

112th Avenuges over the

Flatiron Cro

gnage at stat

cident mana

dor; and

opies with en

36 between 8r more passe

wo or less peo

between 88th

and outside

ing and wide

constructing

y signage at s

d incident ma

corridor; an

ue), and Burlington

ssing and

tions and bu

gement;

nhanced wea

88th Street aengers (threeople in the

h Street and

shoulders;

ening the US

g the existing

stations and

anagement;

d

5

us

ather

and e

S 36

g

bus

US 36 ExLessons  

Final: Jun

Phase 1

CDOT hafor ColorPhase 1 p

M

M

M

Mpu

Mco

 

xpress LaneLearned Re

ne 2016

Project Goa

as made it thrado that moproject, the t

Maximize sco

Minimize ope

Meet or beat

Minimize incublic

Maximize engonstruction a

es Project eport

als

he agency’s most effectivelteam set the

ope and imp

erating and l

schedule to

convenience

gagement ofand sustaina

 

Figure 2 ‐ P

mission to ply and safelyfollowing go

rovements w

life cycle ma

be fully ope

to the pub

f local workeability of imp

Phase 2 Location

provide the by moves peopoals early in

within the pr

aintenance co

rational by J

blic, and ma

ers, businessprovements

n Map

best multi-mople, goods an

n the project

roject budget

osts and pro

July 1, 2015

aximize safe

ses and com

odal transpond informatidevelopmen

t

ovide a qualit

ety of worke

mmunities in

 

ortation systeion. For the nt process:

ty product

ers and trav

the developm

6

em

veling

ment,

US 36 ExLessons  

Final: Jun

US

Scott Re

CDOT PScott.Re

Mark Tal

Function

Mark.Tal

 

xpress LaneLearned Re

ne 2016

S 36 Expre

ees

Project [email protected]

lvitie

nal Lead/Coo

lvitie@jacob

es Project eport

ess Lanes

ctor o.us

ordinator

bs.com

Project

Project L

t website: w

Lessons Le

Bob H

CDOT

Robert

RTD P

Nadine

Svetlan

www.us36exp

earned – M

ays

T Design Ma

t.Hays@state

Project Direc

e.Lee@rtd-d

na.Grechka@

presslanes.co

Master Con

anager

e.co.us

ctor

denver.com

@rtd-denver

om

ntact List

r.com

7

US 36 ExLessons  

Final: Jun

The follothe US 3contain aor best prDevelopm

DisadvDevelo

1. Ove

The projecontract, submit asWorkforcidentifyinrelated tocommunWorkforc(WIN)” p

2. Back

A commiThey comexpectedparticipatperformaincluding The WFDThereforthus, requman hour

3. The

RFP

xpress LaneLearned Re

ne 2016

owing section6 Phase 1 Ex

an Overviewractices for ement/Procur

vantageopment

rview

ect had a DBequates to a

s a part of thce Developmng and incoro the fifth prities in the dce Developmprogram.

kground/S

itment to memmitted to ud to surpass tting. Two D

ance issue. Ag DBEs, to h

D goal was se, the goal wuiring more rs increased.

Lessons

Developmen

es Project eport

US 3ns contain Lxpress Lanes

w of the elemeach elemenrement Phase

dBusine

BE goal of 12approximatelheir proposalment Programrporating traioject goal: “

developmentment Program

Status

eet the 12% utilizing six Dhe 12% goal

DBE firms haA report is suhelp paint the

set at 10% ofwas a “movintraining hou.

nt/Procurem

36 Phase Lessons Lears Project. Th

ment, some Bnt, generally e and Implem

essEnter

2 percent, wly $27.7 mills, their apprm that descriining opport

“Maximize e, constructiom requireme

DBE goal wDBE design l at project c

ave been replubmitted mone big picture

f the total mng” goal. Thurs. This be

ment Phase

1 Lessonrned for manhe sections aackground aseparated inmentation/C

rprises(D

which of the olion. In addi

roach and coibes the Proptunities in thengagement oon and sustaient was base

was providedfirms and 16

completion. laced – one nthly that sh

e of the proje

an hours. The contractorecame more

ns Learneny of the discare organizedand Status onnto lessons leonstruction

(DBE)an

original $23ition, the ITP

ommitments poser’s inno

he Project woof local worinability of id on RTD’s

d by AGJV p6 DBE consThey currenvoluntarily a

hows the statect.

he contractor more than difficult for

ed ciplines and d alphabetican the elemenearned from Phase. 

ndWorkf

1 million coP required prelated to a

ovative approork force. Thrkers, busineimprovemen“Workforce

prior to awartruction firmntly have 47and the othetus of all sub

or committeddoubled thethe contract

key elemenally, and eacnt, and Lessothe RFP

force

onstruction roposers to proposed

oach to his requiremesses, and nts.” The e Initiative N

rd of the conms AGJV is DBE firms

er was a bcontractors,

d to 14%. eir man hourstor to meet a

8

ts of ch ons

ment

Now

ntract.

,

s; as the

US 36 ExLessons  

Final: Jun

VD

Ainprcoco

Wcoin

D(i

Cd

Wan

Imple

Eth

Docum

1. Ove

The RFPand otheruse Aconutilizes oCDOT, JAconex, they are t

2. Back

Several pvia Aconmails in A

3. The

RFP

xpress LaneLearned Re

ne 2016

Verify that feDBE particip

Add to requirnformation. Troject, becauontractor bidontractor to

When reviewommitmentsncluded in E

Define total wincluding ma

Clarify what etermination

When determnd a contrac

ementation/

Ensure that whrough the p

mentCon

rview

P Book 2 Secr documentsnex for docuon the FasTraJacobs, RTDas well as altransmitted t

kground/S

processes havnex. The projAconex.

Lessons

Developmen

es Project eport

ederal and CDation (i.e. tru

rements a repThe WFD gouse the origind required simeet becaus

wing commitms are only coxhibit J on P

workforce hoanagement a

contractor stn (all staff, o

mining the gotor to accom

/Constructio

workforce derogram.

ntrol

ction 2 requir to CDOT vment controacks program

D, AGJV andll responses through Aco

Status

ve been docuject has accu

nt/Procurem

DOT DBE rucking).

port of all suoal on this pnal proposalgnificantly mse of trained

ments, reinfoounted for truPhase 1 but i

ours to includnd superviso

taff is includor excluding

oal a total numplish which

on Phase

velopment s

red that “theia CDOT’s Dl during con

m. All organd HDR). All

to submittalonex.

umented forumulated nea

ment Phase

requirements

ubcontractorsroject was bl hours weremore trainingwork force,

orce to the cucks that areit wasn’t poi

de professionory positions

ded in the Wproject man

umber of traih would bene

staff is doing

e contractor sDocument M

nstruction, wnizations are documents als, and docum

r a variety ofarly 40,000 d

s do not conf

s including Dbased on totae doubled theg hours. Th,

ontractor thae owned andinted out till

nal and skills).

Workforce Denagement).

ning hours wefit the traini

g the duties t

shall transmManagementwhich is the w

registered thare required ments are no

f different sudocuments a

flict in regar

DBEs with pal man hourse WFD goal his was diffic

at DBE truckoperated bylater in the p

led craft emp

evelopment P

would be beting program

they are assi

mit all requiret System.” Cweb-based syhat are on thto be transm

ot considered

ubmittals thaand nearly 2

rds to eligibl

payment s worked on of 14% that

cult for the

king y DBEs. It isproject.

ployees

Program hou

tter to monitm in general.

gned to do

ed deliverablCDOT electeystem that R

he project (i.emitted using d official unl

at are transm8,000 inform

9

le

the t the

urs

tor

les d to

RTD e.

less

mitted mal

US 36 ExLessons  

Final: Jun

BCdthwHo

BCPinC

Pprat

RP

Dis

Imple

S

Efo

D

Unu

Pco

San(m

Um

Uthsyac

xpress LaneLearned Re

ne 2016

Be clear in RFCDOT-provid

ocumentatiohe project. P

were not locaHPTE rather

f documents

Be specific inContractor to

roject. CDOncorporating

Change (FDC

rovide guiderocessed betttachments f

Require Contlan (QMP).

Developing as key to utiliz

ementation/

et up placeh

Ensure use stor the docum

Document pro

Use referenceumbering m

erform qualiontractor/sub

et up procesnd that NDCmonthly/qua

Utilizing a pamaintain plan

Using an estahan 40,000 dystem wouldccess docum

es Project eport

FP requiremded documenon be submitPhase II was ated at the prthan utilizin

s which mad

n the RFP on maintain up

OT must audig the latest fiCs).

elines for thetween the defor review).

tractor to util

and implemezing the CD

/Constructio

holders for do

atus field to ment.

ocesses in th

e column formechanism.

ity checks tobcontractor.

ss for insurinCs and FDCsarterly).

aperless job in sets and do

ablished Intedocuments ind require sign

ments from re

ments what thnt control sytted via documore challe

roject site. Tng the documde it more dif

n as-built drapdated Compit this procesles for Notic

e oversight oesigner and t

lize Project I

enting a consOT-provided

on Phase

ocuments th

track the do

he PIM in Ac

r documents

o make sure

ng that Releas are incorpo

is very efficiocuments.

rnet based dn Aconex. Mnificant staffemote locati

he CDOT exystem. In adument controenging becauTherefore, a ment control fficult to trac

awing requirputer-aided dss regularly tce of Design

of the Releasthe contracto

Instruction M

sistent namind document

hat need to be

ocument with

conex.

that will be

there is cons

ased for Conorated into R

ient and dec

document conManaging theff time. The Ions (other o

xpectation is ddition, requiol system. Tuse of involvlot of documsystem. Thck all docum

rements includesign (CADto insure tha

n Change (ND

sed for Inforor (require si

Manual (PIM

ng conventiocontrol syst

e submitted

h regard to w

submitted c

sistency in ti

nstruction (RRFC sets on a

creases staff t

ntrol systeme document cInternet-baseffices, home

for the contire that all o

This was easivement of HPmentation wahis required amentation.

uding requirD) files durinat the ContraDCs) and Fi

rmation (RFIignatures/nec

M) per Quali

on for all protem.

by contracto

who needs to

consistently s

itle names fo

RFC) plans ara regular bas

time require

m is a must. Tcontrol proceed system ale, the field, e

tractor usingfficial ier in Phase PTE staff thas sent directa lot of chas

ring the ng the life ofactor is usingield Design

Is) documencessary

ity Managem

oject docume

or/team.

o be responsi

so there is a

or the same

re transmittesis

ed to update

There are moess without tlso allows stetc.).

10

a

I of hat tly to

sing

f the g and

nts

ment

ents

ible

ed

and

ore this aff to

US 36 ExLessons  

Final: Jun

UcoresiM

Draina

1. Ove

The 11-mdrainage quality oaccommocompanierequired

2. Back

As part oencompadesign wsystems, forth in iTechnica

3. The

RFP

Bbeximwpponuco

Futh

xpress LaneLearned Re

ne 2016

Using the RTomments onesolution of imilar for fut

Management

age

rview

mile stretch odesign. RFPn the projectodate the ultes are to be rthe CLOMR

kground/S

of the US 36 assed the find

was taken to apreliminarydentifying a

al Requireme

Lessons

Developmen

Be more spececause propoxample, "all mplied havin

would not neeonds built tolacement shaf the work inoise walls." ltimate buildompanies an

or storm draltimate confhat detains fl

es Project eport

TD Quality Mn design submdesign issueture design bsection belo

of reconstrucP Book 2 Sect. Eighteen ttimate roadwreplaced. Th

R/LOMR pro

Status

EIS, a concdings in the at least a 30

y pond locatiareas of concents.

nt/Procurem

cific on whatosers see theponds shall

ng the contraed to be re-go the ultimatall accommoncluding butWhat this st

d-out configund ROW nee

ains, the requfiguration. Alows to their

Management mittals has bes and commbuild projectow for additi

ction along Uction 12 incltotal water qu

way configurhe project alsocess to mod

eptual drainROD. As a ppercent leveons and asso

cern during d

ment Phase

t "accommodese items as accommoda

actor build thgraded in thee volume. Aodate the ultt not limited tatement impuration with

eds are addre

uirement waAll flows, incr historic rate

Oversight (been very effments. Recom

ts that can beional inform

US 36 Phaseluded specifuality and de

ration. Eightso includes tdify floodpla

age analysispart of the Rel to verify feociated ROWdesign so tha

date" meansvalue-addedate the ultimhe pond to the future. At t

Another examimate configto bikeway,

plied was to h this project essed with th

s to convey cluding the 1e. The follow

(QMO) databfective in orgmmend that Ce implement

mation.

e 1 touched nfic requiremeetention pontotal irrigati

three major Fain boundari

s was prepareRFP developmfeasibility of W needs. Conat those areas

s for drainagd features rat

mate configurhe ultimate vthe end of thmple is, "struguration and, guardrail, bbuild all irri such that fu

his project.

flows from U00-year, mu

wing stateme

base to log aganizing andCDOT develted statewide

nearly everyents for drainnds are to beion crossingFEMA crossies.

ed in May 2ment, prelim

f on-site and nsiderable es could be re

e and irrigatther than reqration." Thisvolume suchhe day, we aructure lengthd shall considbarrier, retainigation crossuture agreem

US 36 for thust be conveyent was adde

and track d recording tlop somethine. See Quali

y aspect of nage and wa constructed

gs of 4 indivisings that

009 that minary draina

off-site stormffort was pueferenced in

tion crossingquirements. Fs statement h that the ponre getting thehs and headwder other feaning walls ansings to the

ments with di

he 10-year yed to any ped in the Pha

11

the ng ity

ater d to idual

age m

ut the

gs For

nds e

wall atures nd

itch

pond ase 2

US 36 ExLessons  

Final: Jun

tegrdal

RRci

Bsydthar“ispan

RR

R

CreinEfaovof

NTtuloin

Ftrmreloab

InimF

xpress LaneLearned Re

ne 2016

echnical requradient belowischarge. Thllowable spr

Revise SectioRCP shall be ircular.

Be clearer onystems are reesign storm he 10-year stre typically ninlets shouldpread to withnd limit flow

Revise scheduReport to read

Revise the Dr

Considerable eferring the rnterpretation

Examples incactors for inlf “Area Specarious locatif specific req

Need to have The software urn have muook into this nclude a min

or temporaryrack all temp

monthly repoequirement focation and tbandonment

nclude a statmplications dloodplain D

es Project eport

uirements, "sw the top of

he hydraulic read width pe

on 12.3.2 Promade with c

n inlet requireequired for his exceeded torm.” This inarrower thad be spaced thin a depth tw across exp

ule column id “Prior to P

rainage Repo

detail was areader to var

n and provideclude providilets and defincific Drainagions along thquirements n

some type owill continultiple inlets sfurther to se

nimum allow

y drainage, rporary drainaort that tracksfor future protype of pipe t of removal

tement similadue to any thevelopment

storm drainsf pavement agradient forer Table 12.

oject Specialconfined rub

ements for bhighway bridand to limit

isn’t always an on a roadwto coincide wtwo inches aansion joint

in the deliveProject Accep

ort Outline t

added to Secrious referened the contraing a rainfalning where wge Requiremhe corridor thneeds to be b

of threshold ue to requirespaced closeee if either th

wable bypass

requirementsage that is ins all temporaojects. The pand connectafter the per

ar to, “CDOhird party pePermits, etc

s under US 3and inlet gratr the 100-yea2-2 is not ex

l Provisions bber gaskets

bridges. Sectdges when mt flow acrosspractical on

way. Statemwith piers to at the curb ors to less than

erable table fptance.”

to include a R

ction 12 as tonce manuals.actor and CDl table for thwater quality

ments” sectiohat were idebalanced aga

for spread u inlets until

ely together he language s flow.

s should be anstalled and pary pipe andplan would ntion to existirmanent drai

OT will not bermit processc.

36 shall be dtes for the 10ar return freqxceeded.”

under 603.0to include e

tion 12.2.4.8maximum alls expansion jn bridges sin

ment should b keep the mar shoulder pln one cfs for

for the Final

References S

o what we ex. This minimDOT a “blache entire corry ponds are

on provided sentified in prainst potenti

using the Stothere is a truat the end offor bypass f

added to theprovide loca

d inlet installneed to be aping if requireinage is in p

e held accouses.” For exa

designed with0-year returnquency shall

07(a) to incluelliptical pipe

8 states “decklowable flowjoints to less

nce bridge shbe revised toaximum allolus half of thr the 10-year

Drainage an

Section.

xpect to be bmized the amck and white”ridor, defininto be locatedspecific requ

reliminary deially limiting

orm and Saniue 0.00 cfs bf storm seweflow can be

e RFP to havations via as-led on the prpproved anded, and resol

place.

untable for sample: CLO

h the hydraun frequency l be such tha

ude all jointse as well as

k drainage w spread for s than 1 cfs fhoulder widtho something owable flow he adjacent lar storm.”

nd Water Qu

built rather thmount of

” approach. ng clogging d. The additiuirements ofesign. Definig innovation

itary softwarbypass. We iner runs. Needchanged or

ve the contra-built plans. roject shouldd should inclulution for

chedule OMR, LOMR

12

ulic peak

at the

s for

the for hs like

ane

uality

han

ion f ition .

re. n d to

ctor A

d be a ude

R,

US 36 ExLessons  

Final: Jun

ItMseC

Ifas

Imple

TstOdr

Aacin

Dcooncob

Acost

N“a

Earthw

1. Ove

MainlinePavemenMix AspgrubbingmitigatinBase Cougeotechn

2. Back

xpress LaneLearned Re

ne 2016

t should be rManager for tegments, and

CDOT and th

f a project iss “if required

ementation/

Temporary drtrategy for d

Otherwise, thrainage beco

Acceptance occeptance. Tnstalled line

During the beompaction tef the pipe, ifeed to have ompaction inackfill even

As-built drainompleting thtarted on the

Need to speciadequate cov

work,Ge

rview

e US 36 pavent) while ramhalt base top

g, excavationng soils that hurse. RFP Bonical and pav

kground/S

es Project eport

required to dthe contractod each segmhe contractor

using UDFCd by the eng

/Constructio

rainage plandrainage untihe contractoromes a piece

of permanentThis test wou

for alignmen

edding and best on the arf the pipe diaa thicker liftn this zone. Awith the top

nage plans shhem as constem.

ify minimumver” or confo

eotechnic

ement is beinmps and mostpped with Stn and embankhave swell pook 2 Sectio

vements on th

Status

define one peor. Large des

ment will havr it minimize

CD criteria, gineer” in the

on Phase

ns need to bel the new pe

r starts instale-meal system

t drainage shuld require thnt issues.

backfill proceea of the bacameter exceet above the pA solution c

p of the pipe.

hould have atruction prog

m cover on pform to AAS

cal,and

ng constructt side roads tone Matrix Akment work

potential, plaons 10 and 1he project.

erson in the csign build pre a lead. Wh

es inconsiste

need to be se contract.

tied into theermanent syslling pipe whm that is oft

hould includhe Quality A

ess the contrckfill from seds 24 inchepipe for protecould be that.

a schedule pgresses and n

pipe for metaSHTO requir

Paveme

ed with rigidare being coAsphalt). Ea

k to build up acing R-valu1 included th

contract as throjects will uhen there is oencies and im

specific and

e MOT phasstem is onlinhenever proben insufficie

de lamp testinAssurance (Q

ractors shouspring line (res. The contrection, havet the contract

er the RFP tnot waiting u

al/plastic/RCrements.

ents

d pavement onstructed warthwork conthe roadway

ue 20 materiahe requirem

he Drainageultimately beone point of mproves com

address any

sing plans, sone and functiblems arise aent for larger

ng as a requiQA) to look t

uld be requirerequired on Rractor has stae seemed to stor has a hol

that ensures until the end

CP. M-603-1

(Portland Cewith flexible p

nsists of cleay section. Thal and placin

ments for eart

e Design e split into

f contact betwmmunication

items called

o there is a cioning. and temp r storm flow

irement for through the

ed to documRCP) to the ated that theystruggle gettld point at th

the contractod of the job t

&2 call out

ement Concrpavements (aring and his includes ng Aggregatethwork,

13

ween n.

d out

clear

ws.

ment top y ting he

or is o get

rete Hot

e

US 36 ExLessons  

Final: Jun

Preliminaand crossRFP docuthe work A life-cyand appromainlineminimum

3. The

RFP

InVAintr

In

Fw

Imple

Nsoop

Imb

CO

Atr

Ed

Enviro

1. Ove

xpress LaneLearned Re

ne 2016

ary geotechns road pavemuments. The

k.

ycle cost analoved which . Preliminary

m pavement,

Lessons

Developmen

nitial RFP inValues. ManyATCs to altern a short timreatments tha

nclude speci

urther definewidenings as

ementation/

Need a betteroils-cuts, fillptions would

mprove QA een satisfact

Construction Owner Verifi

Allow for Quraditional CD

Emphasize anoubling as Q

onmenta

rview

es Project eport

nical investigment and strue contractor

lysis (LCCAdocumentedy pavement base, and su

nt/Procurem

ncluded fairlyy proposer ter the requiremeframe. For at may be pr

fications/req

e the use of needed.

/Constructio

r tracking anls, swelling sd be key map

acceptance dtorily proces

schedule neication Testin

uality ControDOT survey

nd enhance tQC.  

al

gations wereucture areas.is responsib

A) was condud the justificadesign reporubgrade thic

ment Phase

y prescriptiveams expresments, whichfuture proje

roposed and

quirements f

SMA on stru

on Phase

d documentasoils, etc., tops and area o

documentatissed at each

eeds to be accng and CDO

ol (QC) to uthub requirem

the QC mate

e conducted The prelimi

ble for any su

ucted by the ation for selerts were alsoknesses wer

ve requiremesed desire toh the RFP d

ects, try to anwill be acce

for temporary

uctures, iden

ation requireo allow for bor station-sp

ion requiremstage – mois

curate enougOT Audits.

ilize GPS/Uments, and i

erial testing r

in 2009 andinary reportsupplemental

RFP designecting concro prepared byre specified i

ents for subgo have more esign team hnticipate the eptable.

y pavements

ntifying wha

ement for thebetter QA andpecific check

ments to clearsture treat, R

gh to allow f

UTS survey teinclude subs

role to reduc

d 2010 for ses were provil investigatio

n team and a rete pavemeny the RFP dein the RFP.

grade and selflexibility s

had to reviewrange of opt

s.

at is expected

e different ad CDOT moklists.

rly define wR20, Base, et

for consisten

echnology instantial test s

ce the tempta

lected mainlided with theons to compl

report prepant for the USesign team a

lect materialo proposed w and decidetional subgr

d for bridge

areas and typonitoring. A

what areas havtc.

nt and proper

n place of sections.

ation of QA

14

line e lete

ared S 36 and

l R

e on ade

pes of few

ve

r

US 36 ExLessons  

Final: Jun

SecuringAs part ocommunprepared elementsenvironmCDOT’s 5 include

2. Back

The RFPcontractolists moreimplementhis resoua challen

3. The

RFP

Sev

Imple

NmSD

Esedth

TMwcoisisMso

SP

xpress LaneLearned Re

ne 2016

g the environof obtaining tity groups, san Environm, impacts, an

mental commcredibility i

ed the requir

kground/S

P included allor needs to tre than 100 spnted, the DBurce, keeping

nge.

Lessons

Developmen

ee items disvaluation cri

ementation/

Note about comeeting perfo

ometimes wDB contracto

Environmentaection whereesign packaghe EIS and R

The RFP stateManager.” It would be invoontractor has involved. Ts taking a ris

Manager’s inolidify this p

uggested lanroject Mana

es Project eport

nmental apprthe ROD in

state agenciemental Reevnd commitm

mitments, notis maintainedrements for e

Status

lowable imprack and propecific Mea

B Contractorg track of th

nt/Procurem

covered in citeria.

/Constructio

ontract requiormance stan

we will need tor room to be

al Compliane the contracge submittal

ROD each m

es the “The Cwas CDOT’olved with es limited the

There is no insk because covolvement. F

person’s role

nguage to adager shall lea

rovals for thi2009, many

es and the fedvaluation, wh

ments includet only for thed, allowing fenvironment

pacts for resoovide evidencsures to Min

r is required hese commitm

ment Phase

construction

on Phase

irements -- Rndards ratherto be prescrie innovative

nce Work Plactor’s Envirols have been

month.

Contractor s’s intention teverything the number of nvolvement ommitmentsFor future co

e on the cont

dd to the temad a cross dis

is project way commitmenderal governhich documeed in the ROe success of for approval tal and permi

ources such ace of compli

nimize Harmto employ anments in the

phase below

Remember inr than being iptive, howeand exceed

an and/or Quonmental Co

reviewed fo

shall employthat the conthat falls undeareas in whion noise, lan

s could be ovontracts, contractor’s team

mplate for futscipline envi

as a process tnts were madnment. In 20ented change

OD. It is vitalf this project, of future pritting on the

as wetlands iance with.

m. To help asn Environmfast-paced D

w that may im

n DB to fram prescriptive

ever in a perfour minimu

uality Assuraompliance Mor complianc

y and utilize tractor’s Enver the NEPAich the Envirndscape or wverlooked wnsider additim.

ture DB projironmental r

that took mode to local g11, the RFPes or refineml that the pro, but also to rojects. RFP e project.

and T&E spAppendix H

ssure these mmental Manag

Design Build

mpact conten

me the langue. It is a tougfect world w

um expectatio

ance ProcessManager repo

ce with the c

an Environmvironmental A umbrella. Ironmental Prwater quality

without the Enonal languag

jects: “The Ereview of all

ore than 10 ygovernments, design team

ments to the oject honor itassure that Book 2 Sec

pecies, whichH of the RODmeasures areger. Even wid environme

nt of RFP or

uage in termsgh balance.

we will give tons

s -- Add a orts on whichcommitments

mental ProjeProject ManIn practice, oroject Mana

y. The contranvironmentage in the RF

Environmentl major desig

15

years. ,

m

ts

tion

h the D

ith ent is

r

s of

the

h s on

ect nager our ager actor al P to

tal gn

US 36 ExLessons  

Final: Jun

susuthonM

T

Emtoexthd

Neninbondco

xpress LaneLearned Re

ne 2016

ubmittals to ummary of the Environmn the Project

Manager morThe EnvconstrucenvironenvironThe conparticipDuring review omonthlyreview wManage The monnarrativwhich hinclude spills, scommunenvironarticles.

The Environm

Environmentamonitoring. To effectivelyxperience sohe back burno this and co

Noise (and otngineering dn a drainage een incompln their reporesign-build ontractor’s n

o Line-oreplac

es Project eport

confirm comthese cross d

mental Compt an Environre involved avironmental ction phasesmental lawsmental decis

ntractor’s Enpate as needeconstructionof the entire y update of thwith CDOT’er’s weekly f

nthly updateve of specialhave occurre

adjusting cotream diversnications. Tmental actio.

mental Mana

al QA – RevThe contracto monitor wa

o far is that thner. For futuronsider maki

ther disciplindisciplines, lireport. In no

lete or minimrt rather thansection, whinoise report w

of-sight analced or remov

mpliance witdiscipline revliance Work

nmental Manadd the folloManager sh

s to assure cos, permit requsion documenvironmentaed. n, the Enviroproject. A s

he Environm’s staff can bfield review.

e of the Envirl environmened during theonstruction asions, stakeh

The narrativeons on the pr

ager should b

view the QAor’s QA grou

ater quality ahe QA groupre projects, eing it part of

nes) – What ike drainageoise, the Conmal. Their strn complying ch is very gowhich may h

lysis for everved.

th all environviews shall bkplan. The Cnager. In ordowing languahall actively pompliance wuirements, a

ents. l Manager s

onmental Maummary of t

mental Compbe counted as

ronmental Cntal compliane reporting pactivities to aholder commes shall incluroject and to

be on the cri

A RFP requireup does not

and the rest op will let envemphasize thf the selectio

constitutes ae, the Contrantractor’s inirategy has bwith the req

ood. Additiohave to be sp

ry location w

nmental desibe included i

Concessionaider to get theage: participate

with contractand the comm

shall attend a

anager shallthe field revipliance Works a substitut

Compliance Wnce actions

period. Examavoid nestin

munications aude enough do serve as the

itical positio

ements for eseem to be s

of the envirovironmental he need for Qon criteria.

a complete “actor seems ditial and sub

been to rebutquests. CDOonal items thpelled out di

where existin

ign commitmin each montire shall empe contractor’s

in both the dt requiremenmitments ma

all public me

l conduct a wiews shall bek Plan. The mte for the Env

Work Plan sand environ

mples of thesng birds, respand regulatodetail fully de basis of rep

ons list.

environmentstaffed to theonmental req complianceQA to have s

“Report”? Indialed into wbsequent subt every comm

OT’s 2011 guhat should beirectly are:

ng mitigation

ments. A thly update o

ploy and utils Environme

design and nts, ade in the

eetings and

weekly field e included inmonthly fieldvironmental

shall includenmental activse activities ponding to fuory agency document theeports and

al compliance level neces

quirements. Oe issues slidesufficient sta

n some of thewhat is expecmittals have

ment and requidance has ae in the

n is being

16

of ize ental

n the d l

e a vities

fuel

e

ce ssary Our e to aff to

e cted e quest a

US 36 ExLessons  

Final: Jun

Imshla

CseBacrep

Ndurearb

Wfefrocadan

Wdthgudfe2

W

Wcopr

Hifalli

xpress LaneLearned Re

ne 2016

o Identi

o Statemgeome

mportance ohould be conanguage in th

Construction eem to take f

Be aware thatccountable fequirements lays a role in

Noise during uring constrelocated, or rreas (hotels, arriers.

Wildlife Croseatures to mariendly. Specf putting ledapacity and mifficult gettinnimals in the

Wildlife Crosetails on thehe FHWA guuidance for irection the eatures are w.

Wildlife Cros

Wildlife Frienontractor warecedence.

Historical – df preservatiolter them unines will be d

es Project eport

ification of th

ment certifyietry of the D

f Noise Linenducted in evhe RFP.

Noise -- Thifull advantagt this can hapfor their comfor their No

n the implem

constructionruction in arereplaced. Aresidential a

ssings I – Beake the culvcifically, one

dges in abovemaintenanceng these featese locations

ssings II – O wildlife crouidance docuindividual ancontractor se

wanted in eac

ssings III—S

ndly Fencingas required to

ditches (evenn of the ditcless specificdisturbed un

he datum us

ing that geomDB project.

e-of-sight Anvery location

is is an area ge of the wigppen and co

mmitments inoise Control mentation of

n – Require eas where ex

Add languageareas, etc) un

e aware that erts carryinge of the irrige the ordinare. Since theirtures approvs.

On Phase 1, thossings, but fuments. Thenimal specieeems to expech crossing a

See note abo

g-- We did ho consult wi

n abandoned ch is implied cally prohibitnless specific

ed for all ele

metry in the

nalysis – As n where an e

where the cggle words (nsider strong

n this area. APlan that thethe plan.

Contractor txisting noise e to the Contnless the Co

the irrigationg their ditchegation compary high water approval o

ved. Conside

here is a havfor the remaie FHWA guies, but it doeect. For futuand call them

out shelves in

have a conflith had differ

ones) need in the gradi

ted. Assumecally prohibi

evations in th

submitted m

noted aboveexisting wall

ommitments(where practger language

Add languagee contractor’

to provide te barriers exitract limiting

ontractor prov

n companieses under the anies on the er mark. Theof the design er a parallel c

ve a hybrid oining detailsidance is gooes not providure projects, m out, simila

n Irrigation d

ict here wherrent opinion

to be fenceding plans, coe that any groited.

he submitted

model is the a

e, a Line-of-l is replaced

s of the contticable, whee to hold thee in the cont’s Public Inv

emporary noiist and are beg work at nigvides tempo

s may not achighway moproject obje

eir concern wis required,

crossing for

of calling ous the contracod for providde the type oCDOT shouar to what w

ditch box cu

re the two ens. Consider

d (similar to ontractors wiound within

d model.

approved

-sight review. Clarify this

tractor’s propere feasible, ee contractor tractor’s volvement T

ise protectioeing removeght in sensitiorary sound

ccept certainore wildlife ected to the iwas hydraulic

it could be small to me

ut some specictor is directeding general

of specific uld decide wh

was done on P

ulverts.

ntities that thgiving CPW

wetlands). Eill feel free tthe right-of

17

w s

posal etc).

eam

on ed, ive

dea c

edium

ific ed to l

hat Phase

he W

Even o

f-way

US 36 ExLessons  

Final: Jun

Walmhd

Cexcocob

Rdrfu

QcoSw

Intellig

1. Ove

The purpelementsmaintenaproject’s Active T

The ITS Circuit T(MVRD)Road WeCounterscomponeEthernet

The ETCTransponRecognitStatus InETC field

xpress LaneLearned Re

ne 2016

Water Qualitylways kept u

management ave to demoisturbance.

Consider Addxample, the ould also reqontractors metter and com

Require handrainage strucuture injurie

Quality Manaontractor’s Qection 17 ite

will put addit

igentTra

rview

pose of the In are to inform

ance and opefunding souraffic Manag

system incluTelevision (C), Travel Timeather Informs, and a Regeents that makswitches.

C system inclnders, Automtion (ALPR)dicator Beacd devices to

es Project eport

y – The contup. Considerreview. For

onstrate that t

ditional RequRFP could d

quest ARE emay see this ammit to addi

drails or othectures and bis.

agement—CQuality Manems into the tional eyes o

ansporta

ntelligent Trm the roadw

eration of theurces. RFP Bgement (AT

udes variousCCTV), Ramme Indicatorsmation Systeeneration Buke up the com

ludes additiomatic Vehicl) Cameras, Lcons. The ETthe ETC ba

tractor has exr using a mecexample, if they have in

uested Elemdescribe the elements thatas a relativeling these ele

er fall protectikeway cros

CDOT Environagement Pla

plan so the Qon some of th

ationSys

ransportationway users, coe facility, an

Book 2 SectioM) on the pr

s devices, sucmp Meter Sta

s (TTI), Autems (RWIS),uilding. In admmunication

onal items sue Identificat

Loop DetectoTC system wck-office.

xpended conchanism to lithe 34-acre

ncreased thei

ments (AREs)minimum ret would makly inexpensivements.

tion for CDOsings in the

onmental Staan. This is thQA staff wilhe areas on c

stemand

n System (ITollect variousnd to collect ton 19 includroject.

ch as Variabations (RMS)tomatic Traff, Bus on Shoddition, the In system, su

uch as Variabtion (AVI) Rors, Lane Cowill rely on th

nsiderable reink acreage limit is surp

ir resources t

) for environequirements ke it a better ve way to m

OT maintenaRFP langua

aff should rehe opportunitll have themconcern duri

dElectro

TS) and Elecs data to assithe tolling re

ded the requi

ble Message ), Microwav

ffic Recorderoulders (BOITS system i

uch as condu

able Toll MeReaders, Autontroller Cabhe communi

esources but disturbed w

passed, the coto match the

nmental elemfor a wildlifcrossing. Bi

make their pro

ance works age to elimin

eview the firty to get man

m on their cheing construct

onicToll

tronic Toll Cist agencies evenue to suirements for

Signs (VMSve Vehicle Rrs (ATR), DoS), Bicycle aincludes the it, fiber opti

ssage Signs tomatic Licenbinets, and Tications netw

still has notwith a higher-

ontractor woe area of

ments – For fe crossing, bidding oposals look

at all large nate potential

rst draft of thny Section 5ecklists. Thition.

Collectio

Collection (Ein the

upport the r ITS, ETC, a

S), Closed Radar Detecti

oppler Radaand Pedestrivarious c cable, and

(VTMS), nse Plate

Transaction work to link

18

t -level ould

but it

k

l for

he 5 and s

on

ETC)

and

ion ar, ian

the

US 36 ExLessons  

Final: Jun

2. Back

The US 3separatedof Operathe perspguide for

Late in thexpandedframewo

To date, house fibCDOT he

A numbeuse and pproject.

3. The

RFP

Uteeq

Dapea

IT

Ifto

Imple

IT

xpress LaneLearned Re

ne 2016

kground/S

36 Project wd managed lations was pr

pective of ther the design,

he RFP deved on via adderk of an ATM

the extent ofber optic wireadquarters

er of ATM syplanned oper

Lessons

Developmen

Use performaechnology, equipment un

Define what Ipproval requach minor el

TS Design an

o Includ

o Includline-o

o Includcontrathat sh

f CDOT/RTDo the Contrac

ementation/

TS Design an

es Project eport

Status

was to be the ane concept.repared whice operator, Cimplementa

elopment phaendum durinM system in

f ITS construre that make in Denver an

ystem featurration of this

nt/Procurem

ance-based respecially onnless includin

ITS elementuirement tranlement.

nd Submitta

de RFP requ

de RFP requf-sight and s

de a more deactor to creathows when t

D preferred ctor with con

/Constructio

nd Submitta

first project . As a part ofch described CDOT, HPTEation, and op

ase, ATM elng the procurncluded in th

uction on theup the ITS bnd will prov

res and enhas system has

ment Phase

equirementsn multi-year ng “or appro

ts require revnsfers risk to

als:

irement to sh

irements forspacing.

etailed ITS dte a list of mthe deliverab

vendor pricintact inform

on Phase

als:

in Coloradof the early dthe characte

E, and the usperation of th

lements wererement phas

he project’s B

e project invbackbone. Thvide commun

ancements ha been develo

s for any ITSprojects. Do

oved equival

view and who CDOT and

how utilities

r deliverable

deliverables lmilestone datbles will be s

ing is availabmation.

o to plan anddesign and RFeristics of thser. It servedhe US 36 ma

e added to thse. The intenBasic Config

volves installhis backbonnication and

ave been addoped during

S elements do not specifylent” languag

hat elements d requires sig

s on ITS plan

s that show

list in the RFes within a csubmitted.

ble for ITS e

d implement FP developm

he managed ld as a high-lanaged lane

he RFP, whint was to get guration.

lation of conne will run fr

controls for

ded via chanthe first two

due to rapidlyy specific moge.

require accegnificant staf

ns.

Camera and

FP, and requcertain timef

elements, pro

a buffer-ment, a Conclane system level concepsystem.

ich were a basic

nduit that wirom Boulderr US-36 and

nge order as to years of the

y changing odel number

eptance. Blanff time to rev

d ATM gantr

uire the frame of NT

ovide this op

19

cept from tual

ill r to I-25.

the e

s or

nket view

ry

TP

ption

US 36 ExLessons  

Final: Jun

IT

Eisinm

Rbchtib

In

E(i

M

xpress LaneLearned Re

ne 2016

o Enforconsisdiscip

TS Submitta

o Enforwork

o Ensurfollow

Enforce the us installed. Tntrusion of w

microduct and

Require detaiegins (includhecklists weime they wereen installed

nclude/enfor

Enforce that Qincluding the

Maintaining E

o Includcontra

es Project eport

ce cross-discstently consiplines.

als and Paym

ce the submbegins (inclu

re that the cowing areas of

ProcuremeSMVMS, schedule if

Installationand deviceof time. Fthan segm

Integrationintegrationdifferent poverlookedacceptance

Maintain Eout separaincrementathe contracwith the pe

Software –

use of watertThe plugs thwater, soil, dd/or cabling

iled quality cding the und

ere created tore updated wd with compo

rce ITS expe

QA establishe undergroun

Existing/Tem

de timeframeactor plans to

ciplinary revider ITS, and

ment:

ission of a duding the un

ontractors prof work:

ent (MaterialLUS, have af this is brok

n – Best to se installation

For the devicment of roadw

n – Once even into the conpeople than td by the cone test period

Existing/Temately from theally over thector wants toermanent co

– Any softwa

ight conduitat twist to seebris, rodent.

control checkderground coo meet projecwith approprionents that w

erience requi

hes the ITS hnd conduit a

mporary Dev

e requiremeno do to fix it

views for ITSd the ITS pla

detailed ITS cnderground c

ogress paym

ls on Hand)a high materken out separ

separate undn since they aces, it may beway.

erything is inntrol systemthe installationtractor on ths are shown

mporary Deve permanente life of the po be paid foronstruction it

are modifica

t plugs that aeal with a rubts, etc… that

klists to be conduit and puct requiremeiate detail a were not in c

irements for

hold points pand pull box

vices

nt for respont), and timefr

S design. Oans consisten

constructionconduit and p

ment schedul

– ITS devicrial cost and rately

derground infare typicallye better to br

nstalled, the m is typically

on. This itemhe schedule. on the sched

vices – Ensut constructioproject. It car, but it is vetems.

ations (e.g. F

are to be instubber gasket t will later c

created for ITull box infraents and starlarge portioncompliance w

QA inspecto

prior to any Iinfrastructur

nse to issues frame require

Other disciplintly had con

n schedule bepull box infr

e distinctly b

ces, particulait is easier f

frastructure, y separated break up type

configuratioy a large effom is usually Verify thatdule.

ure that this ion, so it can ban be a signiery complica

FLIR, CTMS

talled as soonare reusable

cause issues w

TS before anastructure). Prt construction of the condwith the con

ors

ITS construcre).

that come uement for re

ines did not nflicts with o

efore any ITrastructure).

breaks out th

arly VMS, for progressin

poles/suppoby large perie of device ra

on of deviceort and by y underbid ant all the

item is brokebe paid for ificant effort

ated to includ

S etc..)

n as the cone and prevenwith pulling

ny ITS workPreliminary on, but by thduit system h

ntract.

ction beginn

up (what the solving the i

20

ther

TS

he

ng a

orts, ods ather

es and

nd

en

t that de it

duit nt g

k

he had

ning

issue

US 36 ExLessons  

Final: Jun

DdClopu

Lands

1. Ove

LandscapThe LandremovalsBook 2 S

The Landhealth, anor replacproject.

2. Back

Many difacquired specific fplanted, aothers (su

3. The

RFP

See itevalu

Imple

Tlaeacothar

xpress LaneLearned Re

ne 2016

o Includrequir

Drawings shaata points –

Contractors aocations of full box and m

scapinga

rview

ping on the pdscaping Plas, and replacSection 17 in

dscape Plan nd a recommement. The

kground/S

fferent typesproject ROW

formal landsand irrigateduch as Westm

Lessons

Developmen

tems discoveuation criteri

ementation/

The contract andscape plaarthwork wiould be preshe contract mre approved.

es Project eport

de $ penalty rements are w

all clearly dethey shall no

are very relucfinal infrastrumanhole loc

andIrrig

project involan includes thements of Pr

ncluded the r

documents amendation focontractor is

Status

s of landscapW, such as nscaped areas d areas. Formminster, Bro

nt/Procurem

ered in consta.

/Constructio

states that tran is acceptell start long erved are vu

mark good sp.

for not meetworthless)

efine ITS infot be concepctant to updaucture (deviccations, later

gation

lves replacinhe areas to broject-impacrequirements

all vegetatioor remaining s responsible

ping and vegnative seed a

at selected bmal landscapoomfield, or

ment Phase

truction pha

on Phase

rees that are d.” (Book 2,before they

ulnerable durpecimen tree

ting timefram

frastructure lptual in naturate these place locations,als, etc).

ng plant matebe final seedcted trees, shs for landsca

n locations aundisturbed

e for comple

getation wereareas, informbridges, and

pe areas withInterlocken)

ase below tha

not to be im, Section 17.submit a lanring this peries early, pref

me requirem

locations onre. During t

ans to reflect, fiber alignm

erial in all dided; and the lhrubs, landscaping on the

and identified areas, pruneting all land

e present witmal “volunteed significant hin CDOT R).

at may impa

mpacted will b.2.2) In the d

ndscape planiod. There shferably right

ments (withou

the plans, inthe as-built pt actual condment, fiber s

isturbed arealocations, mcapes and irrproject.

es species, coning, removadscaping nee

thin the exister” trees andareas of form

ROW are mai

act content of

be marked “design build n. Subsequenhould be somt after the fir

ut teeth, the

ncluding survprocess, ditions and splice locatio

as on the Promitigations,

rigation. RFP

ondition, sizal, transplanteded on the

ting and d shrubs, sitemal sodded, intained by

f RFP or

“after the d environmenntly, trees thame mechanisrst grading p

21

vey

ons,

oject.

P

ze, ting,

e

nt at sm in lans

US 36 ExLessons  

Final: Jun

Thfothsum

RfifoT

Cthad

RarmCtyir

Maint

1. Ove

Maintenaroadway roadside

xpress LaneLearned Re

ne 2016

The EIS requave to stay oor planting ahe language urrounding o

maintenance.

RFP Clarificairst plan docuormally land

The second p

Consider defihe design-buddressing ea

o Area Tbe revanticip

o Area TadjoinlandscArea Tand ir

o Area Tland hmaintlandownecess

Require Contreas where e

maintaining iContractor toypically not prrigation syst

tenanceD

rview

ance During in a safe confeatures suc

es Project eport

uired a 1 for on CDOT ROall of the replthat will steeopen space la

ations: In subuments exist

dscaped arealan is the pla

ining the threuild project fach is lumpedType 1: Arevegetated witpated. Type 2: Areaning landowncape. These Type 1. The rrigation systType 3: Areahad been formained as Arewners irrigatsary to repai

tractor to maeither CDOTrrigation dur hand water provided. Ptem during C

DuringC

Constructiondition for th

ch as signs an

1 tree mitigaOW, since thlacements. Wer the contraands where t

bsection 17.ting conditios, and identianting plan f

ee specific Cfootprint. (Thd together.)eas within thth the typica

as within theners have a fareas are oftcontractor w

tem in kind.as of new ROmally landscea Type 1. Intion system,ir adjust syst

aintain irrigaT, local entityring the longexisting veg

Potentially adConstruction

Construc

on consists ohe traveling nd guardrail

ation commihere will notWhile alloweactor to plantthe local gov

1.1, split reqons. It will inify any landsfor the new p

Categories ofhese were in

he CDOT ROal CDOT low

e CDOT ROformal agreeten irrigated will be requi

OW acquisitcape and irrin these areas the contracttem so it fun

ation during ty, or RTD lag constructiogetation is nodd a liquidatn.

ction

f maintaininpublic. This, keeping d

itment whicht always be sed as an optit a percentagvernments w

quirement innclude the trscape featureproject.

f landscape n the contrac

OW (both exw maintenan

OW where thement with Cand landsca

ired to replac

tion for the pigated, but ins, if the projetor is require

nctions for th

the Construcandscaping don period (mot effective ated damage f

ng the existinis includes ndrainage inlet

h is very harsuitable/sustion, considerge of the mit

will take over

nto two Landree inventoryes and areas

areas (Area t, however t

xisting and nnce plantings

he local goveCDOT to maaped at a higce any distur

project whern the future wect impacts ted to performhe adjoining

ction period.died due to C

multiple yearsand documefor not main

ng roadway anot only the pts clean and

d to meet if tainable locar strengthenitigation treesr the

dscape Plansy, identify thto be preser

Types) withthe language

new) that ares. No irrigati

ernment or aintain the gher level tharbed landsca

re the acquirwill be the adjoiningm the work landowner.

. NumerousContractor nos). Option fntation is

ntaining the

and temporapavement, bufunctional,

22

you ations ing s on

. The he rved.

hin e

e to ion is

an aping

red

g

s ot

for

ary ut and

US 36 ExLessons  

Final: Jun

evaluatinrequirem

2. Back

Maintenaongoing

3. The

RFP

Ete

In

C

SS

Lm

Rsu

Imple

Maint

1. Ove

RFP BooSafe and to one ofworkers a

2. Back

The contsequence

1. Pco

2. S3. S

xpress LaneLearned Re

ne 2016

ng and makinments for mai

kground/S

ance activitieas problems

Lessons

Developmen

Enhance and emporary co

nclude timet

Clearly identi

pecify acceppecifically s

Limit the amominimize traf

Require the Cubmit a log t

ementation/

tenanceo

rview

ok 2 Section efficient Ma

f the goals ofand traveling

kground/S

ractor’s MOe, with nume

lace temporaonstruct EB hift EB traffhift WB traf

es Project eport

ng repairs tointenance du

Status

es such as re arise.

nt/Procurem

modify the cnditions.

ables for rep

ify the limits

ptable timelisidewalks an

ount of crossffic weaving

Contractor toto CDOT we

/Constructio

ofTraffic

16 includedaintenance of the project:g public.”

Status

OT phasing serous sub-ph

ary pavemenpermanent p

fic to new EBffic to new m

bridges anduring constru

epairing poth

ment Phase

current Leve

pairs in RFP

s of mainten

ines for tempnd length of d

sovers/phaseg and paveme

o identify andeekly.

on Phase

c(MOT)

d the requiremof Traffic is i: “Minimize

cheme in gehases:

nt widening pavement. B pavement,

middle portio

d structures.uction on the

holes and rep

el of Service

and contrac

nance respon

porary pavemdetours.

es/traffic reaent scarring.

d track main

ments for Mimportant toinconvenien

eneral was ba

in WB direc

, construct mon, complete

RFP Book 2e project.

pairing conc

e survey to m

ct.

nsibility- top

ments and al

alignments to.

ntenance dur

Maintenance oo CDOT and nce to the pu

ased on a thr

ction, shift tr

middle portioe WB perma

2 Section 18

crete barriers

make it appli

of ramps, cr

lignments, an

o maximize w

ring construc

of Traffic ond other stakehublic and ma

ree phase co

raffic to WB

on and mediaanent paveme

included the

s have been

cable for

ross roads, e

nd closures.

works zones

ction items a

n the project.holders, and aximize safe

onstruction

B side, and

an ent

23

e

etc.

s and

and

. ties ty of

US 36 ExLessons  

Final: Jun

3. The

RFP

PcothcoC

PLaflaP

Em(bpitRQ

Rlarew

D

Parbrpor

TorravmTth

Ptetem

xpress LaneLearned Re

ne 2016

Lessons

Developmen

rovide strictontractor wihe week. Theonsequence,

Control Subc

rovide languLevel 2 MOTffect the Conanguage statierhaps liqua

Establish a prmake it very cblunt ends, moor shouldert be submitte

Require a safQA, and CDO

Require that tanguage in thequires that g

we need glare

Define MOT

er the CDOTre within 4’ ridge piers, ermanent bar temporary

This project Rr at .5-mile samp gore to ery clear on

midpoint to mThis needs tohe Contactor

rovide strictemporary paemporary ma

month.

es Project eport

nt/Procurem

ter language ll tend to repey use “blan, the travelinontractor can

uage in the cT NCs (missintractor’s pring that the N

ated damages

rocess for saclear in the R

missing delinring, etc). Reed to and accfe to open waOT in Book

the Contracthe contract fglare screense screens thr

clear zone in

T specificatiof the centerstockpiles, e

arrier. Definebarrier.

RFP states, “spacing, whiramp gore inwhere to me

midpoint? Is be clarified

r to be able t

ter requiremevement markarkings were

ment Phase

in the contraport numerou

nket” closureng public tennnot plan fo

contract that ing signs, dirroduction so NC-2 will bes should be i

afely openingRFP. Avoid neators, poorequire a safecepted by CDalk that shall2 Section 16

tor assess glafor determinis only need troughout the

n the RFP u

ions, the Conr of the barri

etc.). Providee the require

“Emergency ichever is lesn the same deasure emergit from the e

d in the contrto fit emerge

ents (applicakings in the e initially pla

act with regaus closures t

es to make upnds to take la

r anticipated

provides morty barrels, dthey tend toe elevated toincurred if th

g new segmeopening a n

r striping, une-to-open chDOT prior tol be attended6 RFP langua

are screens thing where glto be assesse corridor for

sing AASHT

ntractor is reier. Define ae details on hements when

pullouts shass. Interchan

direction of tgency pull-oendpoint of tract languageency pullouts

ation rates, mRFP. The pr

aced instead

ards to the Lthat they donp for their in

ane closures d closures.

ore teeth witdelineators, co take their tio an NC-1 ifhe NC-2 is n

ents of roadwnew section onsafe roadwa

hecklist for bo opening and by represenage.

hroughout thlare screens ed at cross-or vertical pro

TO guidance

equired to pinan obstructiohow to conn

n temporary b

all be providnge distance travel.” Thisout to emergthe first to the and some ws properly.

mil thicknessroject would

d of having th

Lane Closuren’t end up usnternal plannless seriousl

th level 2 MOconflicting sime fixing thf not addressnot fixed in a

way to the trof roadway way transition

both QA/QC ny mainline tntatives from

he project. Pare needed.

overs, but weofile related

e.

n barrier whon in the connect temporabarrier overl

ded between shall be me

s language dogency pullouthe starting powiggle room

s, bead gradad be better sehe Contracto

e Report. A sing throughning issues. Aly and the Tr

OT NC/NCRsigns, etc.) dhe issue. Persed in a weeka certain tim

raveling pubwith safety ins, poor light

and require traffic switch

m the Contra

Provide detaiThis project

e have foundissues.

here obstructntract (drop-oary barrier wlaps perman

each interchasured fromoes not makt. Is from oint of the n

m is needed f

ations, etc.) erved if the gor refresh on

24

hout As a raffic

R’s. do not rhaps k.

me.

lic, ssues ting that hes.

actor,

iled t d that

tions off, ith

nent

hange m

e it

next? for

for good

nce a

US 36 ExLessons  

Final: Jun

Pp

R

Imple

Aafsu

Mfacoavst

Cthonw

Wmoth

Ecla

Tte7

P

Ind

Cre

PthmmE

xpress LaneLearned Re

ne 2016

rovide a meavement (e.g

Require that T

ementation/

Add requiremfter notificatubcontractor

More coordinaces i.e. direoordination vailable per tandardized

Contractor rehe contractorn site within

what is expec

Working Timmake it clear

f time. The chey can get o

Ensure that allearly defineLane Closur

Temporary Temporary sig2-hours of fi

lace some fo

nclude detailistinction of

Clarify requirelocation of

erhaps requihe project en

member of thmodified throEngineers, QA

es Project eport

asurable smog. 3/8” with

Temporary L

/Constructio

ment for Contion by CDOr had to orde

nation with Cction of travshould identsign. This inform for the

sponse timer for this? Ren thirty minucted.

me Violation to the contra

contractor isoff the road p

ll sections ofed including re Strategy,

raffic Controgn stand. Recfirst use if the

orm of limit

led requiremf task specifi

rements for texisting sign

ire that a wengineer on tohe Contractoroughout the pA, QC, etc.

oothness reqa 4’ straight

Lighting Plan

on Phase

ntractor to repOT or QA, toer a sign or s

CTMC for lovel affected,tify panel siznformation se contractor t

: make sure ecommend m

utes, not just

Incidents - Aactor that CDs responsibleprior to the e

f roadway, inallowable titake time be

ol Devices -commend cley are not re

construction

ments for trafc vs. project

temporary cons, new cons

eekly MOT sop of the sectrs Staff comproject based

quirement fot edge).

ns are shown

pair or instalo avoid delaytand or was

ocations of Dwithin and aze, number oshould be incto complete

that this langmaking it cle“respond to

Always stricDOT will noe for managinestablished t

ncluding ramimes for closefore release

- Specify holarifying thatemoved daily

n access poin

ffic control it wide.

onditions – dstruction sign

safety inspection 630.11 r

mpletes this red off of inpu

or pavement

n on the MO

ll signs withys in correctinot actively

DMS panels,approaching of lines and ncluded in theand send to

guage is cleaear that the c

o an incident

ctly enforce wot tolerate viong their wortimes.

mps or sectiosures. If these of the RFP

ow long a pet signs be pey.

nts as approp

inspection- Q

distance fromns, exit sign

ction report arequirementeport. Deveut from the M

transitions o

OT plans.

hin a specifieing issues be

y working on

, including dg the project number of ce RFP, incluCTMC for u

ar. What is econtractor wwithin 30 m

working timolations regark and timing

ons betweense areas are nto come up

rmanent signermanently m

priate.

QA and QC-

m traveled wns, etc.

and/checklists. Ensure thelop a templaMOT design

on temp

ed time perioecause a n the Project

direction signlimits. This haracters

uding a use of signs.

expected frowill have somminutes" if th

me violations ardless of leng the work s

n highways anot spelled owith times.

n can be on mounted wit

with clear

way for

st is submittehat a qualifieate that can ber, CDOT

25

od

.

n

om meone hat is

and ngth

so

are out in

a thin

ed to d be

US 36 ExLessons  

Final: Jun

Modifi

1. Ove

RFP Booand BridgDivision 200 throuapplicablbuild pro

2. Back

StandardRFP, simthe procu

3. The

RFP

Bsu

Bonot

OPhysp

Csp

 

Partne

1. Ove

The RFP

2. Back

A formalformal se

xpress LaneLearned Re

ne 2016

fications

rview

ok 2 Section ge Construct100 of the S

ugh 700 of thle to the Projojects.

kground/S

d Special Promilar to typicurement phas

Lessons

Developmen

Be cautious wuperseded or

Be very specinly changingther provisio

Only include rovisions in ydraulics, ITpecial provis

Come up withpecified in 6

erCoord

rview

P included CD

kground/S

l Partnering essions have

es Project eport

toStand

20 set forth tion for desi

Standard Spehe Standard ject. This se

Status

ovisions applal CDOT prse.

nt/Procurem

when modifyr replaced by

ific on what g a small porons of the sp

minor modiBook 2 Sec

TS, etc.) shousions in Sect

h a reasonab626 may not

dination

DOT’s Stand

Status

Session was been condu

dardSpe

modificatioign-build proecifications. Specificatioction was ge

licable to therojects. Upda

ment Phase

ying standardy the modific

is changing rtion of the S

pec section st

ifications to ction 20. All uld be includtion 19)

ble plan for hbe adequate

(CDOTa

dard Special

s conducted bucted since th

ecificatio

ns to the CDojects. The fiThe second

ons, as well aenerally cons

e project werated SSP’s a

d special procation, only

in the 100 sStandard Sptill apply.

Standard SpProject Specded in these

how to handle.

andCont

l Provision f

by the contrahen.

ons

DOT Standarfirst section c

section contas Standard sistent with

re selected das appropriat

ovisions so ththe intended

section of Boecification (

pecifications cial Provisiospecific sec

le mobilizati

tractor)

for Partnerin

actor at the b

rd Specificatcontained revtained revisiSpecial Provprevious CD

during the prte were via a

hat the entird text.

ook 2 Sectio(i.e. spec boo

and Standarons (e.g. for ctions of the

ion. Mobiliz

ng, dated Feb

beginning of

tion for Roavisions to ions to Divisvisions DOT design-

reparation ofaddendum du

e section is n

n 20. If you ok), state tha

rd Special bridge, RFP (e.g. IT

zation as

bruary 3, 201

f project. No

26

d

sions

-

f the uring

not

are at all

TS

11.

o

US 36 ExLessons  

Final: Jun

3. The

Efoloco

Pst

Plo

Ifnrew

Pmar

Rco

Projec

1. Ove

RFP Booproject. TProject S

2. Back

The ContRevised IScheduleand the T

3. The

RFP

ClamC

xpress LaneLearned Re

ne 2016

Lessons

Establish partollow it on booking for anounterparts u

artnering ladtaff.

artnering apowest level p

f an issue canext level on elationships.

written summ

artnering semaintains goorises.

Remind staff onflicts, etc)

ctContro

rview

ok 2 Section The requiremSchedules, R

kground/S

tractor has sInitial Sched

es are the basTIFIA report

Lessons

Developmen

Cost loading anguage in th

minimum. ThContractors w

es Project eport

tnering laddeboth CDOT any available unless there

dder should

pproach shoupossible.

n’t be resolvthe partnerin In order for

mary of the is

ssions/activiod communi

to always fo) that are con

ols/Sched

2 included tments covere

Reporting to T

Status

ubmitted a Pdules, Monthsis for creatit.

nt/Procurem

all schedulehe RFP that his will allowwill load thei

er/counterpaand Contractbody to resoare absolute

include all l

uld encourag

ved at a loweng ladder to r the next levssue may be

ities should cication chann

ocus on the sntributing to

duling

the requiremed managemTIFIA, and o

Preliminary Ihly progress ing the Mont

ment Phase

s to Level Vrequires all

w the Projectir schedule to

arts at beginntor sides. Diolve issues –ely no other

evels from P

ge staff to res

er level, it shavoid delay

vel to fully uhelpful to p

continue thronels among P

specific issuethe inability

ments for Projment of the Pr

other Project

Initial Schedschedules an

thly Invoice

VI was not clschedules tot’s progress o Level VI t

ning of Projeiscourage sta– staff shouldoptions.

Project Direc

solve issues

hould be escays to the Projunderstand thprovide.

oughout the Project parti

e, not other y for the part

oject Controlroject Invoict Manageme

dule, an Origand Current I

as well as th

learly requireo be Cost Loto be trackedtypically for

ect and requaff on both sd always wo

ctor to desig

with their co

alated immeject and damhe issue, a p

life of the Picipants if a

aspects (perticipants to r

ls and Schedces, management tasks.

ginal Initial SInitial Schedhe Monthly

ed in the RFoaded to leved much mortheir own co

uire staff to sides from ork through

gn and inspec

ounterparts a

ediately to thmage to work

osition pape

Project. Thisfuture issue

sonality resolve the i

duling on thement of the

Schedule, sedules. The Progress rep

FP. Include el VI at a re accuratelyost projectio

27

ction

at the

he king er or

s

ssue.

e

everal

port

y. ons

US 36 ExLessons  

Final: Jun

anlo

Inmco

SacanV

Imple

Mhsuim

Tacthti(a

Ttosc

Fco

Vre

 

xpress LaneLearned Re

ne 2016

nd tracking, oaded to this

nclude additimore effectivontractor nee

trengthen thccurate weeknticipated qu

Verification T

ementation/

Meeting the melpful to meubmission. Wmpact on the

The Contractoctivities. Thihe RFP. It wies back to thaudits, owne

The Scheduleo build the Pchedule.

or any itemsompensation

Verify that thealistic. Thi

es Project eport

therefore is s level.

ional requireve schedule meds to submi

he language rkly look-aheuantities. ThTesting prog

/Constructio

monthly invoet with the C

When the Coe review time

or uses a 3 wis Schedule

would be helphe Project Scer’s verificati

e is required Project. Do n

s that the Con, a specific

he Contractors includes C

not unreaso

ements in themanagementit recovery s

regarding theead schedulehis schedule gram and to p

on Phase

oice due dateContractor prontractor is ce for CDOT

week or a 5 wis not tied to

pful if contrachedule and ion testing (O

to be an accnot allow am

ontractor inteactivity mus

r’s schedule CLOMR, Dit

onable to requ

e RFP for ret, especially schedules.

e requiremene based off th

is critical foplan audits.

e has been arior to NTP

continuouslyand subsequ

week scheduo the Project actor is requiis accurate tOVT), and i

curate represmbiguous or u

ends to seek st be include

durations fotch Compani

quest the sche

esource loadiif schedule b

nt for the Cohe current inor CDOT to

a challenge foto discuss a

y late with thuent submis

ule to plan neSchedule an

ired to showto aid in CDindependent

sentation of hunclear activ

Stockpiled Med in the Sch

or permit appies, etc.

edule submi

ing, which wbecomes a c

ontractor to pnitial schedulmanage the

for the contrarealistic mo

he invoice it sion to FHW

ear term connd it is not a

w how the 3 wDOT staff res

assurance te

how the Convities to rem

Materials/Prhedule for ea

provals is ac

itted to CDO

would allow concern or

provide an le with Owner’s

actor. Wouldonthly date fohas a negati

WA, TIFIA, e

nstruction a requiremenweek schedusource plannesting (IAT)

ntractor intenmain in the

rocurement ach item.

ccurate and

28

OT be

for

d be for ive etc.

nt in ule ing

)).

nds

US 36 ExLessons  

Final: Jun

Projec

1. Ove

RFP Booprocess fBook 1.

2. Back

The US 3conditionand as poproceedechange oelementsAs a resuproject.

3. The

RFP

SCre

Sfo

Rw

Rgpr

Inrebcoprthwth

xpress LaneLearned Re

ne 2016

ct/Contra

rview

ok 2 Section for requestin

kground/S

36 Phase 1 pn of obtaininotential owneed, a portion order. In addi (such as enh

ult, there hav

Lessons

Developmen

pecify ContrCDOT standaegulations.

pecify that Cor easy comp

Remember towriting techn

Require firm iving proposracticable” o

n order for thegulations, aetween CDOonstruction oroject scopehe local agen

with this apprhe project.

es Project eport

actMana

2 included tng, processin

Status

program budng the TIFIAer-risk itemsof the continition, the lochanced struc

ve been many

nt/Procurem

ractor mark-ard practice.

Contractor Cparison to CD

o be prescripical requirem

commitmensal points foror “when po

he project toan IntergoverOT and all loof the projec. This docum

ncies to controach is iden

agemen

the requiremng, and execu

get includedA loan for a ps were eliminngency was cal agencies cture aesthety change ord

ment Phase

-up on Chan This needs

Change estimDOT cost da

tive only whments.

nts from the Cr commitmessible”. The

o remain in crnmental Agocal agenciesct to accommment shall idtribute to thentifying the l

t

ments for Projuting change

d an approximportion of thenated or mitallowed to balong the co

tics) throughders requeste

ge Orders into be clearly

mates shall beata books.

hen needed a

Contractor inents or accepse are not en

compliance wgreement tems prior to the

modate any pdentify a bude project for local enhanc

oject Managee orders on th

mate 6% cone project. Ontigated as debe used to adorridor electeh CDOT and ed by CDOT

n Contract bay defined an

e submitted

and focus on

n managemepting plans wnforceable co

with the Statmplate shall be commencinpotential locadget cap andthese enhan

cements duri

ement on thehe project w

ntingency tonce the projesign and condd elements ed to fund cethe change

T to add elem

ased on valund in accorda

in CDOT st

n performanc

ent plans andwith qualifierontractually

te Controllerbe created anng the designal enhancemd payment mcements. Thing the procu

e project. Thwas defined i

o be set asideect was procnstruction of work via ertain additioorder proces

ments to the

ue of CO or ance with FH

andard form

ce criteria in

d RFP. Avoirs such as “w.

r’s procuremnd executedn and

ments to the mechanisms fhe challengeurement pha

29

he n

e as a cured

onal ss.

HWA

mat

n

id when

ment d

for e ase of

US 36 ExLessons  

Final: Jun

Imple

Mpris

Vph

HbrefC

PIGinearemfa

Rtypre

RrearC

Ure

Mu

Dstpr

Accep

Ba

Dmau

xpress LaneLearned Re

ne 2016

ementation/

Managing conrocess and ns expected th

Verify that thhase.

Having a weering up and ffectiveness

Contractor – P

rior to execuGA will neednstructions). ach enhanceequired, this

make sure allashion.

Request for Cypical sectioossible (i.e. equired to de

Require stricteview/responre completed

Contractor to

Utilize a trackesult in futur

Maintaining aseful for staf

Developing staff during throject manag

ptance/Com

Begin acceptacommon un

Develop a memeet FHWA uditing appr

es Project eport

/Constructio

ntract changnegotiate. Alhat excess pr

he Contractor

ekly project mresolve issue: CDOT – PrProject Man

ution of any d to be execu This may b

ement. Due tapproach w

l approvals (

Change Propns/details rabikeway sigevelop ROM

t conformancnse times ond in a timely use change

king log to mre change req

an updated Pff as they co

tandard besthe life of thegement perfo

mpletion Pha

ance discussnderstanding

ethod to valirequirement

roach (check

on Phase

ges requires allocate approroject funds w

r is followin

managemenes. Participaroject Direct

nager, Constr

change ordeuted by both

be completedto the nature

will need to bi.e. City Cou

osals shouldather than fulgnage). ThisM estimates.

ce with the Cn all change ry fashion. N

orders as an

monitor all pquests.

Project Manaome and go f

t managemene Project. Thformance ove

ase

sions early ing of requirem

idate the Quats for accept

king a percen

a significantopriate staff rwill be avail

ng the as-buil

nt meeting wants should btor, Design Mruction Man

ers for local h CDOT andd via an optie of design-bbe vetted withuncils or Sta

d include direll design pacs would decr

Contract requrequests andot following

n excuse for

potential Proj

agement Planfrom the Proj

nt processeshis allows Cer the life of

n Project witments and exp

ality Assuranance early in

ntage of the d

t amount of sresources tolable to fund

lt process th

with the Contrbe limited to Manager, Co

nager, and De

enhancemend the local agon letter wit

build projecth both CDO

ate Controlle

ection to theckages for Rrease the leve

quirements fod directive leg these requiother delays

ject issues, i

n and the asject to give t

and proceduCDOT to perff the Project.

th the Contrapectations.

nce data devn the Projectdocuments)

staff time to o this activityd additional

hroughout the

tractor is an ethe followin

onstruction Mesign Manag

nts, an amengency (per Sth a proposedts and the qu

OT and the loer) can be ma

e Contractor ROM estimat

el effort (bot

or content anetters so that irements allos in completi

including tho

sociated Risthem history

ures is usefuform self-au.

actor, so that

veloped on tht. Recommeto validate t

track, prepay, especially elements.

e Constructi

effective wang to maintaManager; ger.

ndment to thetate Controld cap amoun

uick decisionocal agenciesade in a time

to develop tes where th time and c

nd these chang

ows the ing the Proje

ose that may

sk Matrix is y on the proj

ul for the CDudits and imp

t all parties h

he Project toend using anthe data. Thi

30

are, if it

ion

ay to ain

e ler’s nt for ns s to ely

cost)

ges

ect.

y

ect.

DOT prove

have

o n is

US 36 ExLessons  

Final: Jun

caC

Procu

1. Ove

The Desifollowing

M

M

A

S

O

Ja

F

The RFPbuild pro

B

B

B

B

R

The ITP instructioselection

2. Back

The US 3Price, Bein the GMany Addiwithin thFederal athe propobridges w

Certain pValue sel

xpress LaneLearned Re

ne 2016

an be time cCDOT staff i

rement/

rview

ign-Build Prg key elemen

March-April

May-July 201

August-Septe

eptember 29

October 2011

anuary 27, 2

ebruary 29,

P included thojects:

Book 1 – Con

Book 2 – Tec

Book 3 – App

Book 4 - Con

Reference Do

issued with ons for propon teams.

kground/S

36 Phase 1 pest-Value SeMP was the “itional Requ

he GMP. Theand the Interosals, ranginwhich were p

proposal elemlection were

es Project eport

onsuming ans leaving for

/Evaluat

rocurement pnts and mile

2011 – Lette

11 – RFQ iss

ember 2011 –

9, 2011 – Iss

1-January 20

2012 – Propo

2012 – Cont

e following

ntract

chnical Requ

plicable Stan

ntract Drawi

ocuments (fo

the RFP incosal preparat

Status

project evalulection”. Th“Basic Conf

uested Elemee Basic Confrlocken Loopng from extenpinch points,

ments were ee based on th

nd difficult tr other Proje

tion/Sele

process utilizestones:

er of Interest

suance, SOQ

– Issue Draf

sue RFP to p

012 – 1 on 1

osals Submit

tractor Selec

standard com

uirements

ndards, Data

ings

or informatio

luded informtion and sub

uation and see GMP state

figuration” oents (ARE) ofiguration prp interchangension of the , and upgrad

evaluated onhe Technical

to complete ects.

ectionPh

zed on the U

t request, me

Q submittals,

ft RFP for in

proposers

meetings, R

tted

cted

mponents us

a, and Report

on only)

mation aboutbmission, and

election was ed in the ITPof the projector portions orimarily conse. Five AREmainline fur

ding amenitie

n a pass/fail bProposal ele

at later stage

hase

US 36 Phase

eeting, and s

, SOQ evalu

nternal review

RFC response

sed on most

ts

t the project,d evaluation

based on a “P was $231Mt (defined in

of AREs thatsisted of rec

Es were definrther to the wes at BRT st

basis. The poements.

es of the Pro

1 project inc

submittals

uation, and sh

w, prepare fi

e, ATC revie

previous CD

, the project n criteria to b

“GuaranteedM. The work n RFP Book 2t the proposeonstructing Uned for optiowest, reconstations.

oints availab

oject when

cluded the

hortlisting

inal RFP

ews

DOT design-

goals, be utilized by

d Maximum to be includ

2, Section 1)er could provUS 36 betwe

onal inclusiotructing exis

ble for Best-

31

-

y the

ded ) and vide een

on in sting

US 36 ExLessons  

Final: Jun

3. The

RFQ/

Dchrem

Swre

FdPmmprstth

IfnP

DPprre

Cpr

Tanresu

Ffe

Prop

Dacpranacal

xpress LaneLearned Re

ne 2016

Lessons

Q/RFP Devel

During the RFheck processesources nee

may likely be

tart RFP wowith similar feview for ele

or developmefined protohase 1, CDO

management members cou

roposed or ptatus is, whohe change w

f multiple auomenclaturePP projects

Draw upon prlan. On US roposal-writevisions wer

Co-location orocess greatl

The VE Studynd ITP (rathequirements uggestions w

or PPP type eedback may

osal Prepara

Document poccess RFP droprietary innd all file tyccess to postll RFP docum

es Project eport

lopment Pha

FQ phase - Ns with clear eds to be acce a significan

ork with a gofeatures. Obtements whic

ment of controcols for initiOT’s Sharepteam coordi

uld always finpending chano is responsibas incorpora

uthors are to e, consistent vs. typical D

revious proje36 Phase 1, ter for clarityre made as a

of project tealy.

y conductedher than the p

to manage rwere implem

projects incy modify the

ation and E

osting for prodocuments renformation. Spes (.zip, CAt items to thements and ad

ase

Need to deveexpectationsounted for in

nt factor for

ood base doctain docume

ch may be ap

ract and techiating, reviewoint system inated, reviewnd the latestnges to each ble for makinated.

be preparingorganization

D-B.

ect documenthe project ty of proposaresult which

am key perso

d for the projpreliminary drisk and obta

mented.

clude all disce approach an

Evaluation P

oposers: Utilead-only, witSystem needAD, etc.). A e site. For Pddendums an

elop a details. An appropn the schedushortlisting

cument from nts from oth

pplicable to y

hnical sectionwing, updatiwas used fowed, acceptet document vdraft docum

ng the chang

g the technicn and approa

nts and proceteam had theal requiremenh improved t

onnel during

ect was basedesign) for sain better val

ciplines in rend/or cost-b

Phase

lize a web-bth separate s

ds to be able limited num

Phase 1, CDOnd seemed to

ed proposer priate length ule, since quasome teams

m a recent CDher projects ayour project

ns, implemeing, and finar all documeed, and finalversion. Maiment that incge or answer

cal sections, ach, and clar

esses for ITPe draft ITP rents and evaluthe documen

g RFP develo

ed on the teasuggestions olue from the

eview of the enefit.

ased systemsecure areas to accommo

mber of owneOT’s Sharepo work well

key personn of time andalifications ovs. others.

DOT design-also as appro.

ent a shared falizing each ents and the lized all chanintain a trackcludes a descring the ques

provide trairify differenc

P and Propoeviewed by auation criternt.

opment bene

am reviewingon how to re

e proposals. M

O&M sectio

m with an arefor each teamodate a file fer-side staff point system l.

nel referenced proper of key perso

-build projecopriate and

file system wdocument. Fproject nges. Team king list of cription, whastion, and wh

ining on propces needed f

sal Evaluatioan independ

ria. Numerou

efitted the

g the draft Refine the Many of the

ons, as their

a for all teamm to exchanfolder structuwould havewas used to

32

e

onnel

ct

with For

at the hen

per for

on dent us

RFP

ms to nge ure

o post

US 36 ExLessons  

Final: Jun

Prop

The fsessio

Wev

ITonmp

RAthfrfu

OafC

AhreEstin

IThre"Escisthv

AA

Public

1. Ove

xpress LaneLearned Re

ne 2016

osal Debrief

following coons after the

Was overall cvaluation.

TP did not rene team sug

more critical,ossibly to ev

Requiring theAREs (specifhe type of rerom looking unds for ROW

One team waffect (positiv

CDOT could

Adjectival ratow they are esults in a fa

Excellent-) retill be carefuncluding mo

TP could be ad five pointesulted in "GExcellent" 9chedule to bs available fohey had to res. the cost to

ATC ProcessATC meeting

cInforma

rview

es Project eport

f Feedback

omments and selection:

considered a

equire submgested that C or interim m

valuation bet

e contractor tfically ARE sponsibility at these areaW in the AR

s surprised tvely or negatconsider sta

tings for evacurrently de

airly small raeducing the oully weighedre scope or p

clearer on hts available,

Good" 68 per5 percent, onegin with, coor every twoeally guess ao do it.

– Proposersgs.

ation

d feedback w

a positive tha

ittal of a CPCDOT requimilestones artween propo

to develop R#1 and #2) pthey are accas closer. CD

REs, but cou

that includintively) rating

ating this cle

aluations shoefined apply ange that moopportunity t

d on future prprice vs. valu

how points wbut due to a

rcent of the pnly a 1.35 poould conside

o months of aat how much

s would pref

was received

at CDOT inv

M schedule.re it to be sure more criti

osals, this cou

ROW plans, placed a greacustomed to DOT went thld consider o

ng or not inclgs on other sarer in futur

ould maybe bto all items

ost teams seeto differentirojects to weue added fro

would be distadjectival ratpoints, and toint differener saying meacceleration

h benefit they

fer to get mo

from propo

volved stakeh

. Teams havubmitted. Onical and CDOuld be consi

acquire, andat deal of rishaving so m

his route sincother approa

luding specifsections/goare ITPs.

be reviewed being rated.

em to fall witate between eight appropom other pro

tributed on ittings, meetinthe best schence. Since soeeting RFP is

(or somethiy may get fro

ore immediat

ser teams du

holders in pr

ve to build thn projects whOT needs midered.

d pay for thesk on the promay have disc

ce there wasaches for futu

fic AREs coals like safety

for future p. The currentthin (from Gteams. App

priately the boposal eleme

tems like schng the RFP redule accelero few points s 0 points, aning similar). om a schedu

te and direct

uring debrief

roposal

hem anywayhere schedul

more detail

e ROW for anoposers and icouraged sos no additionure projects.

ould significay or MOT.

roject to seet approach

Good+ to roach should

balance betwents.

hedule. CDOrequirement ration got were assignnd another pOne team sa

ule accelerati

t feedback at

33

f

so le is

ny is not me

nal .

antly

e if

d ween

OT

ned to point aid ion

t

US 36 ExLessons  

Final: Jun

RFP BooelementscommunManagemContracto

2. Back

During thwere receand respoproject inCDOT si

3. The

RFP

B

Aen

Phel

Cv

Imple

A

AorC

DP

NOet

Bsh

Mtr

xpress LaneLearned Re

ne 2016

ok 2 Section included pricating proje

ment (TDM)or is respons

kground/S

he proposal eeived and raonsibilities snformation. Tide in additio

Lessons

Developmen

Be more pres

Allow key stansures buy-i

rovide measelp both RTDlements to se

Clearly defines. CDOT).

ementation/

Always coord

All responsesr RTD prior

Contractor su

Do not have Creference is

Need to makeOperations dutc).

Better planninhould be sha

Make sure coraveler alerts

es Project eport

4 included treparation ofect progress ) strategies. Csible for dev

Status

evaluation pted them acc

shifted into mThe Public Ion to a PI M

nt/Procurem

criptive in th

akeholders toin and compr

surable perfoD and CDOee if the TDM

e roles and r

/Constructio

dinate with R

s to public coto distributi

upport, as ne

Contractor Pfor PI to pro

e sure the Couring closure

ng on large, ared with CD

ontractor does, newsletter

the requiremf a Public Infand coping d

CDOT’s projvelopment of

process, CDOcordingly. Omainly commInformation

Manager and a

ment Phase

he RFP.

o provide inprehensive fe

ormance meaT in future pM methods a

responsibiliti

on Phase

RTD on item

omplaints drion. RTD prcessary.

PI issue RTDovide a link t

ontractor is pes (any chan

impactful coDOT and RT

es a quality crs, etc.).

ments for Pubformation Plduring the p

oject PI teamf most comm

OT PI team mOnce construcmunicating a(PI) team coa Specialist w

put into majeedback.

asures as reqprojects wheare effective

ies for the te

ms that impac

rafted by thereference is t

D detour infoto the RTD w

providing acnges to sched

onstruction eTD ahead of t

check on item

blic Informatlan, which w

project work m is in place amunication to

members revction began,

about construonsists of twworking for

or elements

quirement ofen locals ask e and worthw

eam (what is

ct them – big

e Contractor to handle cu

ormation as twebsite.

ccurate informdule, early or

events and ptime for inpu

ms before CD

tion on the pwas to includ

and Transpoas oversightools.

viewed the p, the CDOT uction impac

wo representar the contract

(like projec

f TDM progrk for fundingwhile.

s contractor’

g or small.

shall be appustomer com

this is not alw

mation to RTr late openin

public meetinut.

DOT review

project. PI de strategies ortation Dem, while the

proposals thaPI team’s rocts and overaatives on thetor.

t logo). It

ram. This wig for these

s responsibil

proved by CDmplaints with

ways correct

TD Bus ng, cancellat

ngs. Those p

ws (flyers,

34

for mand

at oles all

ill

lity

DOT

t.

tions,

plans

US 36 ExLessons  

Final: Jun

Sre

Dco

E

Ebre

C

P

M

Ban

Ereh

EA

W

In

Einw

D

Eth

Cpr

Pfo

Qualit

1. Ove

RFP Boothe projeand Qual

xpress LaneLearned Re

ne 2016

et meeting tevisit quarter

Develop stronommunicatio

Establish rela

Establish bi-weginning. Thelationship in

Coordinate w

air the right

Meet early w

Be flexible wnd often, and

Establishing aesponsibilityeading in the

Establish morApplications,

Weekly trave

nformation k

Establishing an the project

with the bran

Develop grap

Even if they ahe team to be

Celebrate majroject up and

roject eventor special ev

tyManag

rview

ok 2 Section ct. The contrlity Assuranc

es Project eport

o review Strrly. Just send

ng internal con helps to k

ationships wi

weekly coordhey had a den the long ru

with jurisdicti

person with

ith large emp

when workingd establish c

a Transportay of CDOT ae right direct

re maintenan, websites, et

el advisories

kiosks need t

a project bra– contractor

d – new proj

phic standard

aren’t alwaye proactive a

jor milestond running.

s are not fedvents.

gement

3 included tractor is respce (QA). D

rategic Commding for app

communicatikeep the team

ith key stake

dination meeesire and a neun.

ions on majo

h the right sta

ployers alon

g with retail construction

ation Demanand RTD. Mtions.

nce control ftc.

are extreme

to be update

and at the ber, owner, elejects must ad

ds manual fo

ys used, deveand anticipat

nes with com

derally funde

the requiremponsible for

During constr

municationsproval may m

ions. Establim informed

eholders earl

etings with 3eed to be inv

or constructi

akeholder.

ng the corrid

stakeholderhours outsid

nd Managemake sure age

for communi

ely effective.

d frequently

ginning enabected officialdhere to the

or appropriat

eloping key mte issues.

mmunity even

ed. Set aside

ments and respreparing a

ruction, CDO

s Plan with Cmean it gets l

shing and mand resolve

ly on.

36 Commutivolved and a

ion activities

dor.

rs during the de of the mal

ment (TDM) tencies are ob

ication tools

.

y.

bles cohesivls, etc. . (USCDOT bran

te use of the

messages is

nts to keep th

state funds

sponsibilitiesQMP addre

OT performs

CDOT Publiclost in inbox

maintaining sissues early

ing Solutionsallowing that

s and associa

holiday seall’s business

task force tobservers to e

s like Smart

veness for allS 36 was grannd guidelines

project logo

a good pract

he momentu

as part of th

s for Qualityessing Qualits audits to m

c Relations axes.

trong interna.

s in the t helped the

ated detours

ason. Meet eas hours.

ook the nsure group

Phone

l parties invondfathered is).

o.

tice that allo

um and keep

he project bu

y Managemety Control (Q

monitor the

35

and

al

.

arly

olved n

ows

dget

ent on QC)

US 36 ExLessons  

Final: Jun

Contractotakes theContractoContract Quality AverificatirequiremContracto

2. Back

Satisfyinutilizatioauthoritaof these spreclude

The transbut is tak

3. The

RFP

In ma

ReCoprosu

Reanan

Delia

Re

ThCshtoCcore

xpress LaneLearned Re

ne 2016

or’s quality m form of survor’s QMP toDocuments

Assurance (Qion and docu

ments. Qualityor tests, insp

kground/S

ng the need fon of comple

ative quality systems to pproblems.

sition from Qking on the in

Lessons

Developmen

the RFP, reqaterial testin

equire Controntrol resouroduction stach as traffic

equire Contrnd Notice of nd review per

efine At-Riskability, etc).

equire the Ac

he lack of suContractors tyhould not allo follow the

Contractor toonsistency oesource alloc

es Project eport

managemenveillance of

o assess (andand the QM

QA) efforts iumentation thy Control ef

pections, che

Status

for safe, efficx systems reoversight prerform satis

Quality Assuntended func

nt/Procurem

quire Contrang trends, etc

ractor to idenrces on the Paff is ideal). M

control, ero

ractor to defiDesign Chanriods.

k Process in

cceptance Pr

ubcontractor ypically requlow this and Contractors provide all

on the Projeccation, etc) a

nt efforts durthe construc

d confirm) coMP. Monitori

is intended tohat products

fforts that areecklists, and

cient, cost-efequires the imrogram. Earlfactorily, an

urance to Quction over tim

ment Phase

actor to holdc. Better def

ntify staffingProject in ProMake sure thsion control

ine Request nge (NDC) p

n the RFP (w

rocess to be

quality proguire their subshould provquality progQC and QA

ct for all quaand puts acco

ing construcction operatiompliance wing of the Coo confirm ths, systems, ane monitored reports.

ffective transmplementatiy identificat

nd timely cor

uality Oversime.

d weekly quafine purpose

g numbers fooposal (a stahat QA resou, and ITS.

for Informatprocesses in

when it can be

defined in th

grams is alwabs to providevide Contracgram. The la

A for the subclity efforts (ountability b

ction of the Uions, and the

with both the ontractor’s Qhat the Contrnd subsysteminclude (but

sportation seion of a pro-tion of condirrective actio

ight has dem

ality task forof these me

or Quality Aated ratio of qurces are ide

tion (RFI), Fn the QMP, in

e used, comm

he QMP.

ays a problee their own Qct language ranguage shocontractors. documentati

back on to th

US 36 Corride activities ou

requiremenQuality Contractor providms conform t are not lim

ervices throu-active, systeitions that afons, are nece

monstrated a

ces to discuseetings.

Assurance andquality assurentified for s

Field Designncluding CD

munication w

em on ProjecQC/QA resorequiring all ould also req This will prion, inspectihe Contracto

dor. Auditinutlined in th

nts of the trol (QC) anddes completeto Project

mited to)

ugh the ematic, ffect the abilessary to

few challeng

ss NCs, NCR

d Quality rance staff to

specialty item

n Change (FDDOT involve

with CDOT,

cts (General ources). CDsubcontract

quire the rovide ion, schedulior.

36

ng he

d e

lity

ges,

RS,

o ms

DC), ement

,

OT tors

ing,

US 36 ExLessons  

Final: Jun

Imple

Do

NeCo

Au

Deau

Au

Recothecothe

Fo

Es

RTRe

De

Prba

Hafol

Quan

IdeTa

De

Hama

 

xpress LaneLearned Re

ne 2016

ementation/

o not direct t

eed to have dontractor and

udits should

evelop a riskuditing.

udit frequenc

equire the Coonstruction ae QA proces

onstruction. ese (a specif

ocus should b

stablishing c

TD’s QMO decommend C

evelop an au

oduce projecasis is time c

ave frequentllowing the e

uality task fond those need

entify qualitask Force Me

evelop a high

aving a desigany of these

es Project eport

/Constructio

the Contract

defined cound QA staff o

be focused o

k matrix for e

cy should be

ontractor to pctivities prio

sses/checklisThis is not r

fic example i

be primarily

ommunicati

database is aCDOT devel

udit schedule

ct quality reponsuming. T

t refresher coestablished p

orce and comding improve

ty trends andeetings.

h level Qual

gnated CDOitems above

on Phase

or’s means a

nterpart/partnn who is in c

on Contract

each project

e based off ri

provide QA or to CDOT sts be allowerecommendeis ITS eleme

y on process

on protocols

a good tool fop somethin

e based on co

port on a quaThe Contract

ourses on theprocesses.

mmunicationement.

d how to cha

lity Managem

OT Quality Me to remain a

and methods

nering laddecharge of a s

requirement

element and

isk level of t

processes inapproval. T

ed to be submed as the Conents).

audits and le

s and CDOT

for tracking ang with simil

ontractor’s s

arterly basistor’s quality

e auditing pr

ns should hig

nge or conti

ment Audit T

Manager on tha focus throu

s. Rely on th

er to eliminaspecific area

ts.

d use this as

the particula

n the QMP fThe Contractmitted at a lantractor is le

ess on constr

T expectation

and resolvinlar capabiliti

scheduled ac

s. Producing report shoul

rocess to ma

ghlight both

inue these, a

Training (ex

the Project isughout the P

he Contractu

ate confusiona or disciplin

a priority pl

ar work item

for all foresetor may requater date closess likely to a

ruction audi

ns early on th

ng quality issies for statew

ctivities.

this documeld still be pr

ake sure all s

areas of goo

s appropriat

xample: Ashb

s a good ideaProject.

al requireme

n with the ne.

lanning tool

m to the Proje

eeable uest that somser to actually dev

ts.

he Project is

sues. wide use.

ent on a monroduced mon

taff are

od performan

e, in the Qua

brooke)

a as it allows

37

ents.

for

ect.

me of

velop

s key.

nthly nthly.

nce

ality

s

US 36 ExLessons  

Final: Jun

Right

1. Ove

RFP (ROWCDOdatesrespopropo

2. Back

CDObe abpercedelivconst

3. The

RFP

Hprpr

Hflpr

Harac

Aprscabju

Mteacbu

APas

xpress LaneLearned Re

ne 2016

ofWay

rview

Book 2 SectW) acquisitio

OT was respo that acquire

onsible for thosal, or any R

kground/S

OT prepared Rble to deliverentage of theery of ROWtruction activ

Lessons

Developmen

Having projecroject schedroject of this

Having key inlow of commroject.

Having sufficrise is an imcquisition.

A challenge freliminary Rchedule. Havbility to quicustification t

Many areas oeam utilized cquiring poruilding more

A potential riurchase (totassistance, th

es Project eport

tion 8 includon on the proonsible for deed propertieshe cost of ROROW or eas

Status

ROW plans r the new ROe project imp

W for the maivities.

nt/Procurem

ct specific pdule while ads magnitude

ndividuals wmunication a

cient, dedicaportant com

from a ROWRFP design tving team mckly ascertaio upper man

of US 36 borthe ROW ac

rtions of deve or taller ret

isk was mitigal acquisitioe risk is that

ded the requioject. For thefinition ands would be mOW plans ansements need

based on theOW to the coprovements fn project are

ment Phase

ersonnel assddressing the.

with related eand coordina

ated resourcemponent at lea

W perspectivethat are typic

members within the validitnagement wh

rdered establcquisition teeloped proptaining wall

gated by the n) parcels. A

t the prelimin

irements ande main projed acquisitionmade availabnd acquisitioded beyond t

e RFP designontractor witfell within theas did not e

signed for alle numerous a

expertise andtion between

es available tast as it relat

e is addressincal of a DB ph previous Dty of adminishen needed.

lished resideam to help aerties (parkis to avoid co

early identifAs most of thnary design

d responsibilect’s Basic Cn of ROW. Sble to the conon needed forthe limits be

n and beganthin 6 monthhe existing Uend up being

l functions iand ongoing

d past experin the various

to immediatetes to ROW

ng the numeproject while

DB experiencstrative settl

ential or comassess the coing spaces, bostly acquisi

fication and hese requiredchanges sign

lities for RigConfigurationSection 8 incntractor. Ther AREs inclu

eing provided

n acquisition hs of NTP. AUS 36 corridg a constraint

s critical to mg issues that a

ience greatlys partners w

ely address aplans, surve

erous revisioe maintainince greatly imlements and

mmercial areaost tradeoff bbuildings, acitions.

acquisition d some typenificantly en

ght-of-Way n elements, luded a tablee contractor uded in theird by CDOT.

early enougA large or ROW, sot to the main

maintaining arise on a D

y benefits theorking the

any issues they, appraisal

ons to the ng the projecmproved the

to provide

as. The desigbetween cesses, etc.)

of the Advae of relocationough that th

38

e of was r .

gh to

n

the -B

e

hat l, and

ct

gn

vs.

ance on hese

US 36 ExLessons  

Final: Jun

pad

Imple

Fwco

RTDC

1. Ove

RTD curapproximcorridor atraffic dusmall winThe RTDrequires t

2. Back

The Contprovide a

3. The

RFP

RinrelaRn

NCca

Ah(m

R

InR

xpress LaneLearned Re

ne 2016

arcels are nodvance of th

ementation/

or additionawas concludeonduct the a

Coordina

rview

rently operamately 10,00as it remove

uring construndows of tim

D bus stationthat US 36 a

kground/S

tract requirea temporary

Lessons

Developmen

Revise RFP lnterruptions elocations, reast minute, re

RTD Bus Opotice.

Need realisticContractor. Rause major i

Add languagours in advamany of the

Require Cont

nclude workRTD costs if

es Project eport

o longer requhe remaining

/Constructio

al ROW or ped it was moracquisition, a

tion

ates a robust 0 daily passe

es a number ouction. This me for the cons are locatedand the affec

Status

s the contracstation locat

nt/Procurem

anguage to rat least 1 weequire 2 weeequire the Cerations – th

c schedule daRTD distribuissues if it is

ge to RFP reqance prior to RTD utilitie

tractor to use

king time vioa station is c

uired. The reg parcels.

on Phase

ermanent eare efficient f

and just be re

express and engers. Thisof single occservice oper

ontractor to cd at the US 3cted ramps st

ctor to mainttion.

ment Phase

require Conteek prior to ieks of notice

Contractor to hese addition

ates for closutes this infonot accurate

quiring Contimpacting e

es are not on

e RTD stand

olations incidclosed due to

eward is that

asements thafor the CDOeimbursed b

local bus ses bus service cupant vehicrates throughclose ramps 36 off and ontay open dur

tain access t

tractor to notimplementate. For closupay for the

nal resources

ures, detourormation to te.

tractor to noexisting RTDn UNCC) and

dard detour s

dents for RTo Constructio

t any relocat

at the contracOT ROW team

y the contra

ervice along is critical to

cles from thehout the day and completn ramps throring service h

to the RTD b

tify RTD of tion. For majures or detouadditional bs can’t be ca

s, constructithe public vi

otify RTD FaD facilities. Td eliminates

signage for te

TD impacts inon. Recomm

tions are clea

ctor needs fom to prepare

actor for the t

US 36 that so the TDM ee roadway, thand night, le

te constructioughout the chours.

bus stations a

f any detoursajor closures urs that are cuses that we

ancelled with

ion impacts, ia the RTD w

acilities ManThis aids in usecurity con

emporary sta

nto the Contmend a mini

ared well in

or their worke the plans atotal cost.

serves efforts alonghereby reduceaving only ion activitiescorridor, wh

at all times o

s or route or station ancelled at t

ere scheduledhout 24 hour

etc. from thwebsite and c

nagement 24utility locatincerns.

ations and st

tract to coverimum of $3,0

39

k, it and

the cing

s. hich

or

the d by rs

he can

4 ions

tops.

r 000

US 36 ExLessons  

Final: Jun

pm

Cfastmth

SR

N

Imple

Hre

Rdto

TtrNal

Tco

xpress LaneLearned Re

ne 2016

er day to covmajor detour.

Clearly defineacility minimtation and co

multiple weekhe permanen

tation designRecommenda

o Windsanothemore

o Combadditi

o Use stpanels

o Recomdevelowouldcustompanelscommdiffererequir

Need to invol

ementation/

Having RTD esolution tim

RTD has woretail time sloo perform so

The contractoraveling pub

Need to very ll times durin

The contractoompleted on

es Project eport

ver the addit.

e RTD scopemum requiremonsider the dks or months

nt station).

n requiremenations from R

screens shouer set of glasprotection w

bining the caonal protecti

tandard or eas instead of g

mmend that op a RTD Std reduce longm station eles, furniture, r

mercially avaent ways to pring custom p

lve RTD FM

/Constructio

staff on the me for issues

rked with theots when sta

ome work act

or has agreedlic but allowclear to conng operation

or has also prn the ramps i

tional impac

e elements inments. Nee

duration that s, the tempor

nts should bRTD FM inc

uld provide bss panels sta

when prevaili

anopy and thion for patro

asily availabglass, standa

RTD FM antandard Specg term constements. FM replacement

ailable stationprovide uniqparts.

M and Bus Op

on Phase

project cons, design revi

e contractor ations have btivities durin

d to provide wing RTD bu

tractor that Rns unless app

rovided temin phases.

cts to Bus Op

n the RFP, ined to clearly the temporarary station

e strengthenclude:

better protecaggered on thing winds co

e windscreenons.

ble componeard shapes an

nd RTD Engicifications dtruction and would only

t parts, etc. Fn componenque architect

perations in

struction teamiews, etc.

to provide thbreaks betweng these brea

flagging seruses to continRTD bus accproved other

mporary statio

perations ass

ncluding ADdefine the r

ary facility wshould prov

ned in the Co

ction from thhe loading siome from th

ns into one s

ents for all stnd sizes, stan

ineering grodocument for

maintenance have to stocFM believes

nts (Toler, ettural feature

the scoping

m aids in co

he current bueen services.aks.

rvices at ramnue to use thcess to the strwise.

ons at some

sociated with

DA criteria arequirementswill be in servide equivale

ontract docum

he wind. Potide of the wi

hat side of the

structure wo

tation elemenndard mater

oups work tor use on all Pe costs assocck specific ps that some otc.) can be cs at each sta

phase of the

oordination a

us service sc This allows

mp closures, dhe ramps to tations must

locations so

h a closure o

and temporars for a temporvice (if for ent facilities

ments.

tentially addindscreens toe platform.

ould provide

nts: Lexan ials, paint, e

ogether to Projects. Thciated with paints, glass of the combined in ation without

e Project.

and improve

chedules thas the Contrac

detouring thaccess statiot be maintain

that work c

40

or

ry orary

to

d o add

etc.

is

t

s

at ctor

he ons. ned at

an be

US 36 ExLessons  

Final: Jun

Topp

Rgrcowpu

ToRco

Kacim

Inmth

Intoan

Ndrev(s

Samd

NcoRfiC

Nthrest

AthC

xpress LaneLearned Re

ne 2016

The contractoperations infassengers kn

Require Controups prior tomplaints by

with the new ublic and tha

The contractof any upcom

RTD Securityonstruction a

Keeping RTDctivities is chmprove com

nvolve RTDmaintenance he Project pr

ncluding Woo RTD facilind compensa

Need to clarifesigner specesulting in reerifying ADsurveying on

et up a way menities on etermine thi

Need to estabonstruction (

RTD propertyind it once it

Contractor lo

Need to devehis as a courtequested by tate utility re

Access to RThe Contracto

Contractor ha

es Project eport

or and US 36forming themnow what to

tractor to perto opening tey RTD patrofacilities. Tat bus operat

or is also proming work at y to aid in idactivity at th

D Bus Operahallenging. Imunication

FM group iproblems pr

rior to turn o

orking Time ities would eate RTD for

fy ADA critecified an ADemoval and r

DA compliann a defined g

for RTD FMthe Project is and will sp

blish a proce(a tracking sy was suppot was removest it).

lop a better utesy for Conthe Contract

egistration da

TD secure facor for the statas not done a

6 project stafm of upcomiexpect on th

rform safe toemporary orons and allowThis also provtions will be

oviding 24-hthe stations

dentifying unhe stations.

ations and FaIdentify poinand issue res

in the designrior to constrover.

Violation Inencourage thr operations i

eria during dDA slope that

replacementce of constru

grid instead o

M to identifyin case of dapeed up the r

ss for removsystem or chsed to be saled (either pic

utility locatintractors in thtors is makinatabase in th

cilities needstion electricaa good job of

ff also proviing closures he corridor.

o open walkr new stationw bus operatvides verific

e able to func

hour notices t. This allow

nidentified ut

acilities Mannt of contactsolution.

n review procruction. This

ncident charghe Contractorimpacts asso

design procet left no roomt of the concructed work aof using a lev

y ownership aamage. This repair proces

val of amenitain of custodlvaged or stocked up by R

ion process ohe past, but lng this unfeahe near futur

s to be addreal and compf returning th

de regular uand detours

with RTD bns. This willtions and faccation that evction correct

to the RTD Fs the Facilititilities and to

nagement not for each gro

cess to assists also allows

ges or Liquir to plan statociated with

ess. Numerom for typicalrete. Also nat the beginnvel over sma

and mainten will save FMss.

ties and furndy process). ored by FM,RTD and sto

on RTD propliability andasible. RTDre, so this iss

essed. RTD puter rooms ahese keys an

updates to RTs, so that bus

bus operationl reduce the ncilities to becverything is tly.

Facilities Mies Maintenao be made a

otified of conoup early in

t in identifyis FM to beco

idated Damation work mdetours.

ous instancesl constructio

need to definning of the Pall distances

nance of shelM a lot of st

niture from s Numerous but Contrac

ored mistake

perty. RTD d the quick tuD is planningsue may be m

FM providealong the cornd these key

TD bus s operators a

ns and facilitnumber of come familiasafe for the

aintenance gance group a

aware of any

nstruction process to

ing long termome familiar

ages for impaore effective

s where the on tolerancesne process foProject s).

lters and stattaff time tryi

stations durininstances w

ctor could noenly or

FM has donurnaround on joining t

mitigated.

ed master kerridor. The

ys provide ac41

and

ties

ar

group and

m r with

acts ely

s or

tion ing to

ng where ot

ne

the

eys to

ccess

US 36 ExLessons  

Final: Jun

tonRprola

Nwsywatreto

Bprthfrev

Pd

Dto

Rdimbre

RcuP

Vlobu

In

Signin

1. Ove

xpress LaneLearned Re

ne 2016

o RTD facilieed to re-key

RTD FM recoroject and FMf the temporanguage.

Need to makeworking on uystems at sta

would be to pt each stationesponse to ouo be restored

BRT project tresent were he very end orom the begiveryone on w

rovide projeay to aid in g

Detour and clo guarantee c

RTD Bus Opone more qumpacts. Thee precisely seject any pro

Recognize thaustomers of roject.

Value engineong term imput can cause

nclude RTD

ng,Stripi

rview

es Project eport

ities throughy many of thommends thM will switcrary locks sh

e sure that thutilities. Manations when provide the Cn prior to theutages was n

d within 24 h

team activatvery helpfulof the Projecinning of thewhat was oc

ect staff out aguiding the b

losure signagconsistency

erations is ouickly and efese instancesscheduled anoposals from

at, along witthe Project.

ering propospact evaluatie long term s

FM in desig

ing,Sign

hout the RTDhe rooms in tat temporarych them backhould be som

he Contractony instances tying into th

Contractor we start of connot prompt –hours of an o

tion meetingl. Typically ct. Both parte project to cccurring on th

at any stationbus operator

ge for RTD with RTD st

pen to discufficiently, rats need to be ind executed.

m the Contrac

th the traveli Need to kee

sals should bion prior to aservice and m

gn review to

nals,and

D District (nothe district (y lock cylindk to permane

mething that R

r has a goodwhen the C

he existing uwith better asnstruction ac– potentially outage.

s (internal toRTD FM anties thought

close out washe project.

n that is detors and the pu

stations shoutandard prac

ussing closurther than a pidentified at RTD Bus O

ctor.

ing public, Rep that in mi

be vetted witacceptance. maintenance

minimize lo

d Lighting

ot just the Uthis is time cders be instaent at the enRTD can inc

d understandContractor knutilities. Potes-builts and tctivities. In add contrac

o RTD) whend Bus Operthat having s beneficial

oured, closedublic.

uld be provictices throug

res at stationprolonged cot the beginninOperations r

RTD FM andind when ma

th both RTD These may impacts to R

ong term ma

g

S 36 corridoconsuming a

alled at the bnd of the Projclude in futu

ding of the Rnocked out eential to mitito hold pre-ageneral the C

ct language r

ere all departrations are nall departmeand a good w

d, or modifie

ided by the Rghout the dist

ns if construconstruction png of the Pro

retains the rig

d Bus Operaaking decisio

D FM and Busound good

RTD.

aintenance is

or). RTD wiand costly). eginning of ject. The su

ure Contract

RTD system wmergency igate this risactivity meetContractor requiring util

tments were ot included uents involveway to infor

ed for the fir

RTD Sign Shtrict.

ction work cperiod with doject and mught to approv

ations are theons on the

us Operationd in the short

ssues.

42

ill

a upply

when

sk tings

lities

until d

rm

rst

hop

an be daily ust ve or

e end

ns for t run,

US 36 ExLessons  

Final: Jun

RFP Booand LighProject asigns, an

2. Back

At this po

3. The

RFP

Aco

Imple

Struct

1. Ove

RFP projeStruc

2. Back

US36culvecomp112thbridg

The pMechwallsprovi

The pstruct(desigBridg

3. The

xpress LaneLearned Re

ne 2016

ok 2 Section hting on the prea. These pd additions,

kground/S

oint in the pr

Lessons

Developmen

At the presenompleted on

ementation/

tures

rview

Book 2 Sectct and Sectio

ctures on the

kground/S

6 Phase 1 incerts (major anpleted: Struch Avenue ovges are still b

project incluhanically Stas, Post-and-Piding a noise

project also itures were bgned by the ge, Sign Brid

Lessons

es Project eport

14 includedproject. The plans include

removals, o

Status

roject, no pe

nt/Procurem

nt time, theren the job

/Constructio

tion 15 incluon 15A incluproject.

Status

cludes five bnd minor strture E-16-Y

ver US 36, anbeing constru

udes about 50abilized EartPanel (PP) we wall.

includes signoth standardcontractor).

dge with Can

d the requiremcontractor is

e all necessarr modificatio

ermanent sig

ment Phase

e are no lesso

on Phase

uded the requuded revisio

bridge replacructures com

YB Wadswornd E-16-HKucted by pha

0 major wallth (MSE) wa

walls and land

n structures d (meeting C

The contracntilever, and

ments and res required tory guide, waons to existi

gnage or ligh

ons learned,

uirements anns or additio

cements, thrembined). At trth Pkwy (SH

K West Flatirased construc

ls and severaalls, Soil Naidscape walls

for new signCDOT S-stan

ctor utilizedd Butterfly ty

esponsibilitieo prepare traarning, suppling signs and

hting has bee

as very little

nd responsibons to the St

ee bridge withis time, thr

H 121) over ron Crossingction for traf

al minor walil walls, Cass. The walls

nage, VMS ondard limitatd Cantilever, ype sign stru

es Signing, Saffic designs lemental, and appurtenan

en installed.

e permanent

ilities for Strtandard Spec

idenings, andree bridges hUS 36, Stru

g Dr over USffic access.

lls. Wall typst-in-place (Care either fo

or ITS equiptions) and noSign Bridge

uctures.

Striping, Sigand plans fo

nd regulatorynces.

t work has be

ructures on tcifications fo

d eleven boxhave been fucture E-16-Y

S 36. All oth

pes include CIP) cantilevor retaining f

pment. The son-standard e, M-Sign

43

gnals, or the y

een

the or

x ully YC her

ver fill or

sign

US 36 ExLessons  

Final: Jun

RFP

Pchlothacsp

TRin4mLcudcl

S1Hwra

Bthpuprap

Cinwinpr

Fpm2S

Twprw

xpress LaneLearned Re

ne 2016

Developmen

recast Box Choose betweot of joints inhan the floorcceptable. Ifpecification.

The RFP SectRFP based onn the future. ’ span.) CD

meet ASTM CLRFD Specifulverts desigoes not havelear.

imilarly, AS2 for Reinfo

However, whwithin VIRTIating through

BOXCAR wahis is not a Cublished outrograms, or pproved pro

Cross-referennformation d

written in botnformation. Srovides over

or Non-Staner 2012 CDO

manufactured) Bend radii -standards.

There was amwas written. I

recludes conwritten as req

es Project eport

nt/Procurem

Culverts as Peen cast-in-pn the floor wr of a cast-inf not, the RF

tion 15.2.4.2n discussions(in late 2015

DOT M-stanC1433, whicfications as rgned by the ce this require

STM C1577 orced Concrehen this thrusIS (BrR). Thh VIRTIS (B

as used by thCDOT-approtside of Staffrequire proggram list.

nce and reviedoes not existh Section 15Section 10 crlay options.

ndard Sign SOT S-standad in the USA

for non-stan

mbiguity withItems to be anformance wquired for Se

ment Phase

Pedestrian Ulace or preca

where the pren-place box. T

P should cal

2 requires los with Staff 5, FHWA nodards (July 2ch is AASHTrequired per contractor toement update

tables are deete Pipes, whst load is conhe RFP shalBrR).

he precast booved programf Bridge for gram verifica

ew other RFPst. For exam5 and Sectioncalls for SMA

Structures: 1ard. SeamlesA, which requndard design

h how “Reviadded to futu

with Section ection 628, w

Underpasses –ast box culvecast sectionThe managell for a leveli

ad rating forBridge that to requires ra2012) for prTO StandardRFP, the co

o meet ASTMed, which re

esigned usinhich includesnsidered in pl state LF =

ox culvert dem. Howeverthe contract

ation for any

P sections tomple, vertical

n 19 (ITS &A mixture on

) Cantileverss pipe is onuired thickerns should not

ision to Secture Section 6509, QA req

whether this

– Generally,verts. If they ns fit togetheement team ning surface o

r all box culvthis may bec

ating all culvrecast box cud Specificatintractor used

M C1577. Cequires a stat

ng thrust per s circular, elprograms, it 0.0 for thrus

esigner. In dr, this approvtor. The RFPy programs t

o verify dupll clearance f

& Tolling), wn bridge dec

r sign structunly available r pipe sectiot be smaller

tion 628 Brid628 specificaquirements bsection appl

, the contracchoose precr. These tendneeds to decor some othe

verts. This wcome an FHW

verts greater ulverts less tions. To med ASTM Pre

Current CDOtement in the

AASHTO Llliptical, andwill not ratest on box cul

discussion wved programP shall state that are not i

licate or confor VMS sign

with contradiccks, while Se

ures require sup to 24” dins for non-sthan those s

dge Deck anations: whet

by referencinlies to all pre

tor is able tocast, there ard to be bumpide if this is er smoothne

was added toWA requiremthan or equathan 20’ spaet AASHTOecast box

OT M-standae RFP to be

LRFD Chaptd arch shapese above 1.0 lverts when

with Staff Brim list is not

any unapproncluded on t

ntradictory n structures ctory ection 15

seamless pipiameter whe

standard desishown in CD

nd Girder Unther Section ng Section 50efabricated

44

o e a pier

ss

o the ment al to an O

ard

ter s.

idge,

oved the

was

pe en igns.

DOT

nit” 628 09 or

US 36 ExLessons  

Final: Jun

br5re

SfrspSsoth

Fp

Rar

Mvto

Bin(R

CRco

Can

Imple

Peiprin

A

Epr

E

Cww

xpress LaneLearned Re

ne 2016

ridge or just09.17, 509.1eference or p

ection for Strom CDOT Gpecific requipecs/Manuaome requiremhe reports, in

urther definearticularly w

Reconsider mre expected.

Modify structerified by viowards rehab

Based on a rinspection beReference So

Consider elimReference Drontractor.

Consider whand approved

ementation/

rocedure forither added trecast elemencluded in th

All soil nail w

Existing soil nrior to any w

Ensure CVN

Consistently mwork to be pework to inclu

es Project eport

t prefabricate18, 509.19, 5part of the sp

tructure FouGeotech Brairements or pals. (CDOT ments.) CDncluding all a

e the use of when definin

minimum decContractor

ture rehabilitisual inspectbilitation sho

sk analysis wyond that shouth Boulde

minating conrawings of R

at variance red Aesthetic T

/Constructio

r shop drawito the RFP oents are desighe plan sets s

walls shall ha

nail walls shwork within t

testing (as a

monitor the erformed. Wude.

ed pedestrian509.21, 509.2pecification.

undation Anaanch during rpreferences tis currently OT Geotechapplicable fa

“architecturang what code

ck thickness consistently

tation sectiotion, which mould not be h

with Staff Brhown in curreer Creek and

ncept plans, aRFP and the u

equests or chTreatment Pl

on Phase

ing review anor discussed gned by a vesent to CDO

ave a project

hall have appthe reinforce

applicable) h

structure damWork perform

n bridges, et22, 509.27 a

alysis and Dereport reviewthat are not cwriting a Ge

h Branch reqactors and re

al elements e requiremen

requirementargued for 6

on to indicatemay or may nhindered by

ridge, determent SIA is re20th St HOV

as this is a duupcoming Pr

hanges durinlan.

nd requiremearly in the p

endor, the deOT for review

t standard sp

propriate soied zone.

has been don

mage of exismed during w

tc. In particuand 509.28 sh

esign: Basew, this sectiocurrently speeotechnical M

quested all mesults.

and componnts are applic

t of 8” if ped6” deck thick

e that structunot modify tproviding a

mine whetheequired for bV as exampl

uplicate or hreliminary D

ng design req

ments for CDproject. Bec

etails shown w.

pecification w

il nail survey

ne prior to ste

sting structuwidenings ma

ular, Sectionhould be inc

ed on the comon should anelled out witManual, whi

methodology

nents” in the cable.

destrian/bikekness on the

ure damage lthe scope. Inprescriptive

er a detailed bridges to remes of this sce

hybrid of whDesign Packa

quire an upd

OT involvemcause some w in shop draw

written.

y or location

eel shipment

ures to verifyay present ad

ns 509.14, cluded as

mments receny CDOT-thin existingich may cleato be define

RFP,

eway structuese structure

listed must bnnovation

e list.

bridge main. enario.)

hat was showage by the

date to the fin

ment should wall types awings are no

n verification

t.

y list of rehabdditional reh

45

eived

g ar up ed in

ures s.

be

wn in

nal

be and ot

n

b hab

US 36 ExLessons  

Final: Jun

Survey

1. Ove

RFP projesurveweste

2. Back

The cphaseneede

3. The

RFP

Bth

Fbfr

TdD

Imple

Eeq

Apr

Third‐

1. Ove

RFP AgreAgenOwneto ageof the

xpress LaneLearned Re

ne 2016

y

rview

Book 2 Sectct. CDOT pr

ey (Federal tern project li

kground/S

contractor we; during theed for increa

Lessons

Developmen

Be clear in RFhere is no mi

or utility surased on acturom key map

The accuracyiscrepancies

Days of NTP

ementation/

Ensure that prquipment is

Allow for optroviding the

‐PartyAg

rview

Book 2 Sectements on th

ncies, Railroaers. In additiency-fundede Bikeway o

es Project eport

tion 9 includrovided exiso US 287) aimit). A cont

Status

was able utilize D/B phase ased detail or

nt/Procurem

FP what the isunderstand

rveys, be cleual locates anps, owner fil

y of the RFP s in control p1 will be res

/Constructio

roject QA hoin good wor

tion of usingey meet spec

greemen

tion 6 includhe project. Tad, Irrigationion, CDOT ed enhancemeor selected in

ded the requisting topograand aerial matrol diagram

ze the CDOTthey have sur extents.

ment Phase

basis and mding.

ear in RFP (vnd surveys, ales, etc.

topo and surpoint informasurveyed or c

on Phase

olds a pre-surking order a

g Universal Tified toleran

nts

ded the requiThird-party cn Ditch Comentered into ents or additinterchange fe

irements andaphic informapping suppl

m was also pr

T-provided supplemented

methods are o

via separate and which ar

rvey was noation providcorrected by

urvey conferand have bee

Total Stationnces.

irements andcoordination mpanies, Pub

IGAs with lions to the peatures.

d responsibilmation based lemented wirovided.

survey informd with additio

of topo surve

files, etc.) wre based on b

ot guaranteedded that is repy CDOT at n

rence and thaen certified p

n for fine gra

d responsibiland approva

blic Utility Olocal agencie

project, and f

lities for Suron a combin

ith field surv

mation for thonal field su

ey provided

which utility best availab

d, but the RFported to CD

no cost to the

at contractorper CDOT S

ading/blue to

lities related als were requ

Owners and Pes along the for local age

rvey on the nation of fie

vey (US 287

he proposal urvey where

by CDOT so

informationle informatio

FP stated thaDOT within e Contractor

r’s survey Survey Manu

opping,

to Third-Pauired from LPrivate Utilitcorridor relancy mainten

46

ld to

o

n is on

at any 60 .

ual.

arty Local ty ated nance

US 36 ExLessons  

Final: Jun

2. Back

Initiacurrewhich

3. The

RFP

AprpranUriin

Ifthcoasop

Sen

Imple

TA

Vth

Utility

1. Ove

RFP projeprojeworkowneident

2. Back

xpress LaneLearned Re

ne 2016

kground/S

al coordinationt status or dh would affe

Lessons

Developmen

Although coorocess to putromising at tnd a change

US36 bridge.isk to these in place if the

f local agenchese featuresonfigurations a bid optioption prices

ee discussionhancement

ementation/

The IGA procAccount for t

Verify that CDhe IGA.

yRelocat

rview

Book 2 Sectct. In additioct identified

k with these eers, and four ification num

kground/S

es Project eport

Status

on with mosdraft agreemect the design

nt/Procurem

ordination wt a crossing the start andorder issued Approvals f

items, especie original con

cies request bs ahead of timn. For some on hoping to

were much

on on IGAs inprocess.

/Constructio

cess is time cthis time in y

DOT accoun

tions

tion 7 includon, Book 1 i

d six private uentities, fourmore with p

mbers were i

Status

st entities waments were in

n-build prop

ment Phase

ith the Railrunder the ra

d was suppord during confrom railroadially if they ncept becom

betterments me and then features, theget a lower higher.

n the Contra

on Phase

consuming ayour project

nting is billin

ded the requincluded sectutility owner utility relocpublic utilityidentified in

as started durncluded in thposals.

oad was starailroad for thrted by the Rnstruction to ds will alwaare critical p

mes infeasibl

which they wjust include

e local agencprice than th

act Managem

and lengthy schedule.

ng 3rd partie

irements andtions and ders and five pcation agreemy owners. Du

the utility m

ring the devehe RFP docu

rted by CDOhe Bikeway, Railroad ultim

put the bikeays be a chalpath items, ale.

will fund, we the work incy requestedhe CDOT es

ment section

for negotiati

es per the pa

d responsibilfinitions app

public utilityments were uring projectmatrix.

elopment ofuments, espe

OT very earlya concept thmately had teway over thlenge; assign

and have a co

work to agreen the basic prd we include timate, but t

of this docu

ion and 3rd p

ayment sched

lities for Utilplicable to uty owners in texecuted wit developme

f the RFP, anecially for ite

y in the RFPhat looked to be discardhe railroad onn appropriatontingency p

e on a cost foroject their betterm

the resulting

ument for loc

party approv

dule defined

lities on the tility work. Tthe corridor.ith private utnt, 329 utilit

47

nd ems

P

ded n the te plan

or

ments

cal

val.

d in

The To

tility ty

US 36 ExLessons  

Final: Jun

The uEnergidentamou

4. The

RFP

Witp

Abr

Ddre

Cthisutnbu

Eut2

Imple

Tonnupoppwavfuin

Wwth

xpress LaneLearned Re

ne 2016

utilities impagy has the mified 353 uti

unt of utilitie

Lessons

Developmen

When doing pt difficult to otential utili

A more detailreaks would

During the deiscussions welocated and

Consider provhe RFP deves for CDOT tility ownerseeds to be reudget for the

Educate utilittility owners- 3 years to g

ementation/

There seems tne work ordumber can hotential utilif the utility hlans (storm potential utili

work orders avoidance/imuture (i.e. Can 10 years an

When groupework elementhe RFC proc

es Project eport

acts in the comajority of thility conflictes has proven

nt/Procurem

preliminary properly ideity relocation

led Utility Md be beneficia

evelopment/pwith the utilitd potential sc

viding the abelopment produring the ses and possiblelocated durie utility relo

ty owners dus to understaget a project

/Constructio

to be a miscder or one nohave multipleity conflicts has been apppipes, bridgeity impacts wand no-confl

mpact processan CDOT retnd understan

ed in a singlets associatedcess is segme

orridor are 2he dry utilitys or resolution to be a cha

ment Phase

utility investentify the utin.

Matrix, with mal.

procurementty owners aschedules and

bility (schedocess. The melection procly have theming construccation, or re

uring the devand CDOT's t to physical

on Phase

onception tho-conflict fore work order(grading, pippropriately ae, retaining wwith each utilict forms wos, and have mtrieve projec

nd what deci

e work orderd with the onented with m

5 percent wey impacts. Ason impacts oallenge, espe

tigation, maplity and und

many more u

t stage, it wos to how/whed costs, and i

dule and budgmore detailed

cess. This wm more recepction. The utilocate the ut

velopment stD-B procureconstruction

hat a utility irm associatedrs and no-copes, foundatavoided or rewalls, gradinility needs toould providemore retrievact documentasions were m

r, it is very dne work ordemultiple pote

et utilities ans of Septembon the projececially on a c

apping is schderstanding th

utility identi

ould beneficen the potentidentify it on

get) to pothod the Utility Mwould also prptive to a timility owner ctility prior to

tage about Dement procen.

identificationd with that u

onflicts assoctions, etc.) toelocated. As ng, lighting) o be processee a completeable documeation (work made during

difficult to ider. Utilities aential impact

nd 75 percenber 2013, thect. Working corridor of th

hematic at behe complexi

ification num

cial to have mtial utility w

n the Utility

ole more keyMatrix is, throvide more mely responscould also apo the project

D-B. It is veryess, and that

n number coutility. A utilciated to addo assure that the particulaare develop

ed. In additioe explanationentation for order and no

g construction

dentify all ofare a reactionts from multi

nt dry. Xcel e contractor on such a vahis size.

est, which mity of the

mbers at logi

more detailedwould be

Matrix.

y utilities duhe lower the assurance to

se when a facppropriately .

y difficult foit typically t

ould only havlity identific

dress the the entire lear separate R

ped, a reviewon, multiplen of the utilitCDOT in tho-conflict fon?)

f the potentian to design, iple project

48

has ast

makes

ical

d

uring risk

o the cility

or takes

ve cation

ength RFC

w of e ty e

orms)

al and

US 36 ExLessons  

Final: Jun

elww

TRB

BWanagrereAbtoexOnObyTcowdapdas

Tonwto14repfacob

xpress LaneLearned Re

ne 2016

lements. Adwork associatwet utilities).

There are newRelocation ABuy America

Book 2 SectioWork that is r

n agreementgreement anesponsible foesponsible to

Agreement.” een executedo have the Cxecuted. Th

Owner refuseot entered in

Orders/DRALy permit and

There are circontract proce

where a URAeveloping expplicable thiocumentatiossociated wi

The US 36 prnce subsurfa

when reviewio understand4.1.4.1 (Permequired to beermanent Wacilities, struonsider inclueing shown

ARE

es Project eport

ditional worted with the

w requiremengreements (U

a language an

on 7.6.1 (Utirequired fromt with such Und shall not bfor drafting ao coordinate On the US d and a utilitontractor co

he Contractores to sign thento an executL and CRALd that any prcumstances wess when ex

A can take upxhibits that ris would alloon/justificatioith the utility

roject has haace investigaing design pad the potentiamanent Lighe shown on t

Work and shauctures, and uding similaaccurately a

Additio

rk orders/no-impacted ut

nts for Buy AURA) will nnd requireme

ility Agreemm a Utility OUtility Ownebe responsiband negotiatie with such U36 D/B projty has been iordinate witr has tried to

e No Conflicted URA. S

Ls) that referrotections unwhere the precuting URA

p to two yearrefer to provow for the Con to docum

y matrix.

ad difficulty ation has beeackage submal impacts tohting Designthe plans. “Tll include exall other exi

ar language uand cross dis

Acr

onal Requeste

-conflicts wotility (i.e. ma

America andneed to have ents.

ments) states Owner withoer. The Contble for negoting the agre

Utility Owneect we have identified onth the utility o coordinate ct/Work OrdSuggest inclur to accommnder C.R.S. 4rocurement dA’s with Utirs to executeisions of theontractor to

ment control w

getting the cen completedmittals and do utilities, den) is the onlyThe plans shxisting topogisting and prunder other Bciplinary rev

ronym List

ed Elements

ould also assanhole adjust

d utility relolanguage in

“If the Conout an agreemtractor shalltiating such aeement. The er as if it had ran into ins

n the utility mowner as if with the Utier/DRAL an

uding exhibitmodation of u

43-1-1401 ardeadlines doility Ownerse with varioue CDOT permprovide prowith regards

contractor tod. There ha

determining iesign, projecy section thathall address graphy, ROWroposed faciBook 2 Sectiview is occu

t

sist in definintment vs. tot

cation’s. Ann the URA’s

tractor idenment, CDOTl not be a paagreement. Contractor

d an executedtances whermatrix. The a utility agrility Owner,

nd CRAL bets (No-Conf

utilities withire no longer

o not allow fo. There hav

us utility owmit when a Uper project s to schedule

o update the uave been somif a utility is ct schedule, et specificallyboth tempor

W, Utilities ailities.” Mayion’s to assu

urring.

ng the type otal relocation

ny future Utthat include

tifies Utility T may enter arty to any

CDOT shalwill be d Utility

re a URA hasRFP is writeement has b and the Util

ecause they hflicts/ Work in CDOT ROapplicable.

for the lengthve been insta

wners. By URA is not

e and billing

utility base fme challenge

shown correetc. Section y states whatrary and and drainagey want to ure utilities a

49

of n on

tility es

into

ll be

s not tten been lity have

OW

hy ances

s

file es ectly

t is

e

are

US 36 ExLessons  

Final: Jun

xpress LaneLearned Re

ne 2016

ATC ATMBOS BRT CDOTCLOMCPM DB DBE EIS ETC FDC HMAHPTEHOV ITP ITS MHTMOTNDC NEPAPI PCCPQA QC QMORFC RFI RFP ROD ROWRTD TDM

es Project eport

Alterna

ActiveBus onBus R

T Colora

MR Condit

Critica

Design

Disadv

Enviro

ElectroField D

A Hot ME High-P

High OInstruc

Intellig

Method

Mainte

Notice

A Nation

Public

P Portlan

Quality

Quality

O QualitRelease

Reques

Reques

Record

W Right-o

Region

Transp

ative Technic

e Traffic Man Shouldersapid Transitdo Departmen

tional Letter o

l Path Method

n-Build

vantaged Busi

nmental Impa

onic Toll CoDesign Chan

Mix AsphaltPerformanceOccupancy Vctions to Propo

gent Transpor

d of Handling

enance of Tra

of Design Ch

al Environme

Information

nd Cement Co

y Assurance

y Control

ty Managemed for Constr

st for Informa

st for Proposa

d of Decision

of-Way

nal Transporta

portation Dem

cal Concept

anagement

t nt of Transpo

of Map Revisi

d

iness Enterpri

act Statement

ollection nge

e TransportatVehicles

osers

rtation System

g Traffic

ffic

hange

ental Policy A

oncrete Pavem

ent Oversighruction

ation

als

ation District

mand Managem

ortation

ion

ise

t

ation Enterpr

ms

Act

ment

ht

ment

rise

50