ABBREVIATIONS
AAP Annual Action Plan APL Above Poverty Line BP Block Panchayat BLCC Block Level Coordination Committee BPL Below Poverty Line BRGF Backward Regions Grant Fund DLCC District Level Coordination Committee DPC District Planning Committee DPR Detailed Project Report EPA Entry Point Activities FGD Focus Group Discussion GIS Geographic Information System GP Grama Panchayat GW Ground Water IEC Information, Education and Communication IT Information Technology IWMP Integrated Watershed Management Programme LHA Livelihood Activities LSGD Local Self Government Department LSGI Local Self Government Institutions MCM Million Cubic Meters MGNREGS Mahatma Gandhi National Rural Employment Guarantee Act MLA LAD Member of Legislative Assembly Local Area Development scheme
MPLAD Member of Parliament Local Area Development
IWMP-DPR,Ithikara Block Panchayat 2012
3
MSL Mean Sea Level NABARD National Bank for Agriculture and Rural Development NGO Non-Governmental Organization NRAA National Rain fed Areas Authority NRHM National Rural Health Mission NRM Natural Resource Management OBC Other Backward Caste WCDC Watershed Cell Cum Data Centre WDT Watershed Development Team SHGs Self Help Groups UGs User Groups
IWMP-DPR,Ithikara Block Panchayat 2012
7
Part I Introduction
The Integrated Watershed Management Programme (IWMP) initiated by the GoI focuses on the conservation, development
and rational utilization of natural resources for addressing the growing issues of food insecurity, water scarcity and environmental
crisis, especially in the rainfed areas of the country in a sustainable manner. The programme perceives generation of rural
employment opportunities and steady increase in rural household income by way of promoting and supporting natural resource
based livelihood systems and microenterprises. Centrality of People’s Participation makes the Programme inclusive and more
effective.
A cluster of seven micro watersheds comprised in portions of Ithikkara, Kottarakkara and Mukhathala blocks in Kollam
District, Kerala has been included under IWMP Batch II. The Programme covers portions of nine Gram panchayaths. The Gram
panchayaths are Poothakulam, Chathannor, Adichanalloor, Chirakkara, Kareepra, Pooyyapalli, Thrikkovilvattam, Mayyanad and
Nedumpana. Total geographical area of the watersheds is 4917 ha. The area belongs to an earlier prominent agricultural tract of the
district, especially, with reference to food crops. The entire area drains into the Ithikkara River.
Micro Watersheds in the Cluster Sl.No. MICRO WATERSHED CODE AREA
01 Neelamthazham 612c 907.6 02 Plakkad 612a 935.0 03 Kakkathopp 612k 858.7 04 Mylakkad 611b 807.7 05 Meenad-1 6123a 674.8 06 Meenad-2 6123c 472.8 07 Uppukadav 6124a 260.4 TOTAL 4917.0
IWMP-DPR,Ithikara Block Panchayat 2012
8
I.1 Project Background
Stat
e
Dis
tric
t
Thal
uk
Blo
ck
Micro Watershed Grama Panchayat
Wards
Tota
l A
rea
Inte
rvan
sion
A
rea
Pro
ject
A
mou
nt
Ker
ala
Kol
lam
Kol
lam
& K
otta
raka
ra
Ithik
kara
, Muk
hath
ala
& K
otta
raka
ra
Name Code Full Partial
4917
hec
tor
4917
hec
tor
737.
55
Uppukadavu 6I24a
Adhichanalloor 13
Chathannoor 16, 17
Chirakkara 15 13, 14, 16 Mayyanadu 6, 11, 12, 13
Mylakkadu 6I1b Thrikkovilvattom 13, 14, 15, 16
Mayyanadu 4, 9 Adhichanalloor 1, 14, 16, 17, 18 12, 13, 19, 20
Meenadu 1 6I23a Adhichanalloor 13 Chathannoor 12, 13, 14, 15 1, 2, 3, 9, 10, 16, 17, 18 Chirakkara 1 2
Meenadu 2 6123c
Adhichanalloor 13 Chathannoor 16, 17
Poothakkulam 3 Chirakkara 12, 13, 14, 16
Plakkadu 6I2a Adhichanalloor 3, 4, 5, 12
Nedumpana 13, 14, 15, 16 17, 18, 19 Thrikkovilvattom 8 4, 6, 7, 14, 15, 16
Kakkathoppu 6I2k
Nedumpana 8, 9, 10, 11 Kareepra 13
Pooyappally 1 Adhichanalloor 2, 8, 15 7, 11
Neelamthazham 6I2c Nedumpana 5, 6, 7, 12 2, 3, 4, 18, 19, 20, 22
Kareepra 15
IWMP-DPR,Ithikara Block Panchayat 2012
9
Major objectives of the Project
Take up necessary in-situ water conservation activities to mitigate the problem of water scarcity in the location and for
augmenting groundwater recharge.
Adopt necessary interventions to reduce soil erosion from the watershed areas with a view to maintain sustainable
productivity of the area
Identify, promote and support various Production Systems and Micro Enterprises that have substantial bearing on the natural
resource base of the project area
Identify, promote and support various livelihood activities related with the natural resource base of the project area
Plan various suitable production systems to bring more fallow/waste lands in the watersheds into use
Carry out various activities necessary for the regeneration of environment pertaining to the project area.
IWMP-DPR,Ithikara Block Panchayat 2012
10
I.2. Organisational Set up
I.3. Project Fund and Fund Flow
The cost structure of the Project is Rs.15,000 per Hectare. The Funds will be utilized as per the stipulations in the Common
Guidelines issued by the GoI. The Funds received by the State is transferred to the lower levels as shown in the flow chart below.
DLCC & WCDC
NRAA
WDT TSO
Social Audit team Monitoring team
TSU
MoRD, DoLR Centre
DoRD, SLNA
DPC
PIA
State
District
Project
Block
SHGs -UGs
Watershed Committee
DISTRICT PROJECT MANAGER
PIA
WATERSHED COMMITTEE
SHGs -UGs CRD
IWMP-DPR,Ithikara Block Panchayat 2012
11
I.4 PROJECT BUDGET
10%
1% 1%4%
5% 1%
56%
9%10% 3%
IWMP Fund Distribution
Administrative exp.
Monitoring
Evaluation
Entry Point Activities
Institution and capacity
DPR Prepration
NRM
Livelihood Activities
Psm
Consolidation Phase
PROJECT FUND DISTRIBUTION Item Amount in Rs.
Administration 73,75,500 Monitoring 7,37,550 Evaluation 7,37,550 Entry Point Activities 29,50,200 Institution and capacity building 36,87,750 DPR Preparation 7,37,550 Natural Resources Management 4,13,02,800 Production Systems & Micro Enterprises 66,37,950 Livelihood Support Systems 73,75,500 Consolidation 22,12,650 Total 73755000
IWMP-DPR,Ithikara Block Panchayat 2012
12
Part II General Description of the Project Area
II. 1. The District
Kollam district of Kerala came into existence on the 1st July 1949. The district has a total area of about 2491 sq.km. It
accounts for 6.4 percent of the total area of the state. In female work participation rate (16.77 percent), the district holds the 7th
place. Forest accounts for 28.52 percent (710.44 km2) of the total area of the district. The district is situated on the South-West cost
of Indian peninsula between North Latitudes 9010’ and 8045’ and East Longitudes 76025’ and 77015’.
Physiographically the District falls under the three natural divisions of coastal land, mid land and high land.Ithikkara and
Kallada are the rivers in the District. The only major fresh water lake, Sasthamcotta Kayal is here. Ashtamudi Kayal and Paravoor
Kayal are the major lakes of the District.Parts of other two lakes, Edava and Nadayara Kayals come in Kollam District.
Ithikkara River
The Ithikkara River originates from the hills situated at Madathirikunnu at about 240m above MSL and from the hills
located south west of Kulathupuzha. The Vattaparambu stream and the Kundumon thodu are the major tributaries. The river
passes through the villages of Vayala, Pampira, Ayur, Chadayamangalam, Thruvambhagom, Atturkonam, Adichanalloor, Kottiyam
and Chathannoor. The river is 54kms long with 642 km2 of catchments.
IWMP-DPR,Ithikara Block Panchayat 2012
13
Ithikkara Block
Ithikkara block was formed in April 1961. It is situated in Kollam Taluk of Kollam district. Poothakulam, Kalluvathukkal,
Chathannoor, Adichanallor are the Grama Panchayats that come under the Block Panchayat. Areas identified under IWMP belong
to parts of all these panchayaths excepting Kalluvathukkal. Ithikkara River flows through the heart of the block area. Each village in
Ithikkara has got its own myths and stories to tell. Poothakulam was once a thick forest.
Mukhathala Block
Mukhathala block is also situated in Kollam taluk of Kollam District. Portions of Nedumpana, Mayyanad and Thrikovilvattam
Panchayats of Mukhathala Block fall under the project area.
Kottarakara block
The Kottarakara block also bears much historical significance. The famous Kottarakara Mahaganapathi temple is situated
here. Kottarakara is also known for Kathakali and is the birth place of many renouned artists in the field of fine arts and kathakali.
Kakkathopu and Neelamthazham portions of the Kareepra Grama Panchayat in Kottarakara Block are covered under the project.
Pooyapalli is another Panchayat a part of which comes under the project. Books like Annathe Keralam, Samskarathinte
Nazhikakallukal authored by historian Shri. Elamkulam Kunjanpillai tell that Budhism had prevailed in the region for a long time.
IWMP-DPR,Ithikara Block Panchayat 2012
14
II.2. Extent and Location
Stat
e
Dis
trict
Thal
uk
Bloc
k Micro Watersheds
Grama Panchayat
Gram Panchayat constituencies covered
Trea
tabl
e A
rea
Pro
ject
Cos
t R
s la
khs
Ker
ala
Kol
lam
Kol
lam
& K
otta
raka
ra
Ithik
kara
, Muk
hath
ala
& K
otta
raka
ra
Name Code Fully covered Partially covered
4917
hec
tor
737.
55
Uppukadavu 6I24a
Adhichanalloor 13
Chathannoor 16, 17
Chirakkara 15 13, 14, 16
Mayyanadu 6, 11, 12, 13
Mylakkadu 6I1b
Thrikkovilvattom 13, 14, 15, 16
Mayyanadu 4, 9
Adhichanalloor 1, 14, 16, 17, 18 12, 13, 19, 20
Meenadu 1 6I23a Adhichanalloor 13
IWMP-DPR,Ithikara Block Panchayat 2012
15
II.2.1 Geographical Coordinates
Latitude 8056’45” N - 8047’57” N
Longitude 76038’48” E - 76043’52” E
Chathannoor 12, 13, 14, 15 1, 2, 3, 9, 10, 16, 17, 18
Chirakkara 1 2
Meenadu 2 6123c
Adhichanalloor 13
Chathannoor 16, 17
Poothakkulam 3
Chirakkara 12, 13, 14, 16
Plakkadu 6I2a
Adhichanalloor 3, 4, 5, 12
Nedumpana 13, 14, 15, 16 17, 18, 19
Thrikkovilvattom 8 4, 6, 7, 14, 15, 16
Kakkathoppu 6I2k
Nedumpana 8, 9, 10, 11
Kareepra 13
Pooyappally 1
Adhichanalloor 2, 8, 15 7, 11
Neelamthazham 6I2c Nedumpana 5, 6, 7, 12 2, 3, 4, 18, 19,
20, 22
Kareepra 15
IWMP-DPR,Ithikara Block Panchayat 2012
16
Boundary lines of the Project Area
North From Neduman kavu to the west Nallila-Palamukku
East From Nedumankavu to the South Meeyannor Panchayat sheematti junction
South From Paravoor Muncipality Mukkam towards east to Kotheri and Thalachira
West From Palamukku towards south Kannanaloor , Mylakkadu up to Nedungolam
II.3.Criteria for Selection
Project name
Project type Weightage
IWMP Desert i ii iii iv v vi vii viii ix x xi xii xiii 5 3 0 10 0 0 15 7.5 15 15 10 15 15
IWMP-DPR,Ithikara Block Panchayat 2012
17
No Criteria max Score Ranges & Score
i Poverty index (% of poor to population) 10 Above 80% (10) 80 to 50 % (7.5) 50 to 20% (5) Below
20% (2.5) ii % of SC/ST population 10 More than 40% (10) 20 to 40% (5) Less than 20% (3)
iii Actual wages 5 Actual wages are significantly lower than minimum wages (5)
Actual wages are equal to or higher than minimum wages (0)
iv % of small and marginal farmers 10 More than 80% (10) 50 to 80% (5) Less than 50% (5)
v Ground water status 5 Over exploited (5) Critical (3) Sub critical (2) Safe (0)
vi Moisture index/ DPAP/ DDP Block 15 -66.7 & below (15) DDP
Block 0 to -33.2 (0) Non DPAP/ DDP Block
0 to -33.2 (0) Non DPAP/ DDP Block
vii Area under rain-fed agriculture 15 More than 90 % (15) 80 to 90% (10) 70 to 80% (5) >70%
(Reject)
viii Drinking water 10 No source (10) Problematic village (7.5) Partially covered (5) Fully covered 0)
ix Degraded land 15 high- above 20% (15) Medium- 10to 20% (10) Low-less than 10% of TGA (5)
x Productivity potential of the land 15
Lands with low production & where productivity can be significantly enhanced with reasonable efforts (15)
Lands with moderate production & where productivity can be enhanced with reasonable efforts
Lands with high production & where productivity can be marginally enhanced with reasonable efforts (5)
xi
Contiguity to another watershed that has already been developed/ treated
10
Contiguous to previously treated watershed & contiguity within the Micro Watersheds in the projects (10)
Contiguity within the Micro Watersheds in the project but non contiguous to previously treated watershed (5)
Neither contiguous to previously treated watershed nor contiguity within the Micro Watersheds in the project (0)
xii
Cluster approach in the plains (more than one contiguous Micro Watersheds in the project)
15 Above 6 micro-watersheds in cluster (15)
4 to 6 micro watersheds in cluster (10)
2 to 4 Micro Watersheds in cluster (5)
xiii
Cluster approach in the hills (more than one contiguous Micro Watersheds in the project)
15 Above 5 micro-watersheds in cluster (15)
3 to 5 Micro Watersheds in cluster (10)
2 to 3 Micro Watersheds in cluster (5)
Total 150 150 90 41 2.5
IWMP-DPR,Ithikara Block Panchayat 2012
18
II.4. Physiography, Relief and Drainage
The project area falls under the Midland stretch of the state. Each micro watershed under the project is comprised of Arable
Land (cultivated land normally under private ownership), Non-Arable Land (non cultivated and common land) and Drainage Lines.
Top of a small hill in the Nedumpana Panchayat is the highest point in the watershed. It is at a height of 90 m above MSL.
Poyyapalli and Adichanalloor are the second highest areas. Places such as Poothakkulam (Ithikkara block) and Mayyanadu
(Mukhthala block) belong to the coastal belt. The relief as represented in terms of the vertical interval between the remotest point in
the watershed and the outlet point of it is found to be 80 m. Nearly 90% of the project area falls below a height of 20 m from MSL.
As the project area is situated almost near the tail end of Ithikara River joining the backwaters of Paravoor kayal, the exit of
water through the outlets during monsoons gets a little stagnated in the lower portions of the watersheds and causes inundation of
agricultural lands. There are seven major drainage lines in the project area and are known as Puliyila Thodu, Meenadu –
Chathanoor Thodu, Meenadu Thodu, Konathu Ela Thodu, Edappanal Thodu, Chaniyil Thodu and ThazhuThala Ela Thodu.
Uncontrolled mining of clay for industrial purposes is rampant, especially, in the Grama Panchayats of Mayyanadu, Chirakara,
Chathannoor, Pooyapally, Adhichanalloor and Nedumpana. This has lead to the distortion of normal drainage mechanism of the
area and has given chance for various related environmental issues in the localities.
II.5. Climate
The area related to this project enjoys a warm humid climate. Average annual rainfall is 2416mm. Major contribution (about
60%) of the rain fall is from the South-west monsoon sets on normally in the first week of June every year.The climate is geneally
featured with alternate wet and dry spells. The atmospheric temperature of the area usually reaches the peak during the months of
April-May. Relative humidity of the locality varies between 85-90%.
Rainfall Distribution of Kollam District for the Year 2000-2012 (mm)
IWMP-DPR,Ithikara Block Panchayat 2012
19
Jan. Feb. Mar. Apr May Jun Jul. Aug Sep Oct Nov Dec Actual Normal Deviation 1 2000 2 41 38 129 88 473 132 557 202 220 181 125 2288 2498 -210 2 2001 61 62 15 166 219 407 368 284 255 355 233 7 2432 2498 -66 3 2002 3 18 61 200 252 265 206 278 86 592 143 0 2104 2498 -394 4 2003 1 50 103 166 105 335 297 240 66 511 89 62 2025 2430 -405 5 2004 2 57 48 152 614 406 287 203 212 281 161 4 2427 2841 81 6 2005 26 17 31 257 213 392 464 104 284 240 311 193 2532 2495 37 7 2006 18 9 149 96 351 307 377 255 383 575 306.2 5 2831 2495 336 8 2007 0 12 40 186 161 499 579 263 408 445 128.8 26 2743 2495 24
Source : Land Resources of Kerala State,KSLUB 9 2008 0.0 41.0 224.9 137.6 120.8 207.1 454.8 265.1 247.0 360.8 122.7 25.6 10 2009 2.2 3.0 105.7 121.9 136.4 272.3 369.7 185.5 272.6 325.9 317.0 15.7 11 2010 11.5 0.0 59.1 221.1 203.5 357.0 362.3 304.8 258.3 527.8 388.4 95.0 12 2011 57.1 98.6 46.7 177.4 148.0 417.4 283.0 219.6 242.2 233.5 267.0 100.9 13 2012 13.7 20.9 77.4 228.6 145.8 167.5 210.6 272.6 149.8 240.2 111.1 17.4
Source: http://www.imd.gov.in/section/hydro/distrainfall/kerala.html
II.6.Geology
Granite gneiss of the archaean age is noticed in the areas. Laterites of varying thickness found in the area are insitu
decomposition products of gneissic rocks rich in ferruginous material. Sedimentary laterites developed in Varkala formation are
noticed in the South-Western Portions. The narrow valleys are composed of colluviums and alluviums of recent origin.
II.7.Water Sources
People in general depend upon open wells for drinking water purposes. Streams, ponds, wells, lakes etc form the major water sources in the project area.The following table shows the list of major water sources in the area.
Major Streams (Thodu) in the Project Area
IWMP-DPR,Ithikara Block Panchayat 2012
20
Name of the Watershed
Name of thodu
Length (meter)
Average width
(meter) Water
Availability
Neelamthazham Puliyila ela thodu 2469 5 12
Meenadu 1 Meenadu, chathannoor thodu 4895 8 12
Meenadu 2 Meenadu thodu 750 3 12
Kakkathoppu Konath ela thodu 1675 2 6
Plakkadu Idappanal thodu 1300 2 6
Uppukadavu Chaniyil thodu 725 2 12
Mylakkadu Thazhuthala ela thodu 4392 4 12 (Source: Drainage survey-GPK)
Number of Open Wells for drinking purpose
Sl no Name of the Watershed Public Household Total
1 Mylakkadu 24 4073 4097
2 Meenadu 1 12 3213 3225
3 Meenadu 2 8 1239 1247
4 Neelamthazham 16 4927 4943
5 Kakkathopu 22 4198 4220
6 Plakkadu 26 5145 5171
7 Uppukadavu 6 1541 1547
(Source: Open well survey-GPK)
IWMP-DPR,Ithikara Block Panchayat 2012
21
II.8. Ground water
Water scarcity is a major problem in the area. Though the watersheds under consideration of the project are not far from the
backwaters and the sea, the status of the ground water in the areas remains vulnerable. Many of the water sources in the area
including streams, ponds and open wells remain dry for considerable periods every year despite the receipt of sufficient
precipitation. Excessive sand mining from the riverbeds downstream has substantially lowered the local water table. Also, the
unscientific human interference including improper land use in the upper catchments in the watersheds has caused severe gaps in
the recharge of ground water in the locality. Most of the areas of the watersheds face water shortage. The following table gives a
picture of the situation.
IWMP-DPR,Ithikara Block Panchayat 2012
23
Status of Ground Water Resource of the area (As per GEC-1997) as on 31st march 2004 Sl
.No.
Name
of th
e bloc
k
Dome
stic 2
004
Dome
stic 2
029
Indus
trial 2
004
Indus
trial 2
029
Total
annu
al G/
W
rech
arge
(MCW
) Na
tural
disch
arge
du
ring n
on-m
onso
on
seas
on (M
CM)
Net a
nnua
l G/W
av
ailab
ility (
MCM)
(7-
8)
Exist
ing gr
oss g
roun
d wa
ter dr
aft fo
r irr
igatio
n (MC
M)
Exist
ing gr
oss g
roun
d wa
ter dr
aft fo
r do
mesti
c and
Ex
isting
gros
s gro
und
water
draft
for a
ll use
s (M
CM)(1
0+11
) Al
locati
on fo
r dom
estic
an
d ind
ustria
l wate
r su
pply
up to
next
25
year
s Re
quire
ment
for
dome
stic a
nd
indus
trial w
ater s
upply
Ne
t gro
und w
ater
avail
abilit
y for
futur
e irr
igatio
n dev
elopm
ent
Stag
e of
GW
deve
lopme
nt in
%
(12/9
*100
) Ca
tegor
y
1 Ithikkara 6.22 7.34 0.21 28.98 2.90 26.08 11.18 6.22 17.40 7.55 8.47 7.35 66.72 Safe
2 Mugathala 6.44 7.59 0.04 0.27 25.35 2.54 22.81 14.39 6.48 20.86 7.86 13.90 0.56 91.46 Semi critical
3 Kottarakara 7.71 9.17 0.04 0.37 31.79 3.18 28.61 8.33 7.75 16.07 9.54 10.29 10.75 56.17 Safe
Ground Water Resource Potential of Ithikkara, Mughathala, Kottarakkara Block as on 31st March 2004 in CMC
Sl. No Assessment
unit Block
Command/ Non
Command
Recharge from rainfall during
monsoon season
Recharge from other sources during
monsoon season
Recharge from rainfall during non-
monsoon season
Recharge from other sources during non-
monsoon season
Total groundwater recharge
National discharge
during non monsoon
season
Net annual ground water
availability
1 Kottarakara NC 12.06 Nil 12.1 4.82 28.98 2.9 26.08 2 Mughathala NC 12.7 Nil 8.65 4.00 25.35 2.54 22.81 3 Ithikkara NC 17.35 Nil 11.82 2.62 31.79 3.18 28.61
(Ground Water Department)
IWMP-DPR,Ithikara Block Panchayat 2012
24
II.9.Water Supply and Irrigation
In areas close to the coastal belt, ground water faces the issue of salt water intrusion renders the quality of water poor with
reference to its drinking and cooking purposes. Implementation of an Indo-Japanese drinking water project is under way. The project
is expected to address a good deal of drinking water scarcity of the area on completion. Kallada Irrigation Project - KIP- has been
the major venture to provide irrigation for agriculture in the locality. But the KIP does only a little favour, barely for about two months
a year. The KIP does not provide any irrigation support for taking second and third crops in locality.
II.10. Socio-economic Details Total population of the project area is 107812. This includes 55631 women and 52181 men. In general, the socio-economic
status of the inhabitants of the watershed is better. Steady income from cash crops such as cashew and income from certain
industries including tile/brick kilns play a very vital role in maintaining the socio-economic standards of the society.
Labour from agriculture and allied sectors has been much beneficial to the construction arena which was found to be more
remunerative for the labourers in the locality and nereby. Expansion and betterment of the National Highway passing through the
area have opened up sufficient opportunities for a considerable section of the community to venture into various kinds of business
concerns. But, a negative attitude is noticed from the part of the local laboures in making substantial out turn for the payments they
receive. This has caused the job providers to engage labourers from outside state (Odisha, West Bengal, Assam etc). Usually, hard
works are taken up by these persons from outside. These people do make use of this opportunity for making very good earnings.
Almost all households in the area have Bank Accounts. Most of the financial assistances related with various State and
Central Schemes/Projects are transacted through these Accounts. This has greatly motivated a good number of households to
develop a habit of saving from their income.
Population
IWMP-DPR,Ithikara Block Panchayat 2012
25
Sl. No
Name of Watershed
Total Population
Population General SC ST BPL Male Female Male Female Total Male Female Total Male Female Total Male Female Total
1 Kakkathoppu 21327 10465 10862 9213 9812 19025 910 1050 1960 168 174 342 4929 5017 9946
2 Meenad 2 8614 4216 4398 3832 4150 7982 288 313 601 14 17 31 1350 1438 2788 3 Neelamthazham 20812 10202 10610 9700 10508 20208 280 305 585 8 10 18 4827 5019 9846 4 Mylakkad 13572 6416 7156 6372 6904 13276 129 139 268 20 18 38 2411 2503 4914 5 Meenad 1 14487 7115 7372 7115 7372 14487 89 136 225 15 19 34 3222 3561 6783 6 Uppukadavu 7200 3084 4116 3288 3562 6850 143 154 297 25 27 52 1459 1720 3179 7 Plakkadu 21980 10683 11297 10386 11252 21638 151 163 314 14 14 28 5108 5399 10507
SHGs Identified in the Villages
20%8%
19%13%
13%
7%20%
Population
Kakkathoppu
Meenad 2
Neelamthazham
Mylakkad
Meenad 1
Uppukadavu
Plakkadu
IWMP-DPR,Ithikara Block Panchayat 2012
26
1 2 4 5 6 7
No.
Watershed Nos No. of members No. of SC/ST in each category
No. of BPL in each category
Date of
form-ation
Category M F Total M F Total M F Total
1 Mylakkadu 89
(i) Landless 118 126 244 28 38 66 54 72 126 2012 April-May (ii) SF 261 258 519 11 12 23 96 101 197
(iii) MF 5996 6718 12714 85 96 181 2253 2323 4577 (iv) LF 41 54 95 6 10 16 8 7 15
Total 6416 7156 13572 130 156 286 2411 2503 4915
2 Meenadu 1 73
(i) Landless 103 111 214 25 27 52 94 92 186 2012 April-May
(ii) SF 813 828 1641 33 36 69 485 494 979 (iii) MF 6185 6422 12607 65 69 134 2789 2820 5609 (iv) LF 14 11 25 6 8 14 4 5 9
Total 7115 7372 14487 129 140 269 3372 3411 6783
3 Meenadu 2 45
(i) Landless 56 72 128 17 15 32 29 38 67 2012 April-May
(ii) SF 354 393 748 82 90 172 123 143 266 (iii) MF 3777 3904 7680 184 230 414 1192 1250 2442 (iv) LF 29 29 58 8 6 14 6 7 13
Total 4216 4398 8615 291 341 632 1350 1438 2721
4 Uppu-kadavu 39
(i) Landless 54 63 117 7 4 11 28 33 61 2012 April-May
(ii) SF 478 512 990 24 25 49 234 251 485 (iii) MF 2524 3501 6025 137 145 282 1186 1645 2831 (iv) LF 28 40 68 4 3 7 11 17 28
Total 3084 4116 7200 172 173 350 1459 1720 3405
5 Plakkadu 157
(i) Landless 152 163 315 22 30 52 79 85 164 2012 April-May
(ii) SF 4101 4170 8271 18 18 36 2009 2044 4053
(iii) MF 6398 6924 13322 118 115 233 3007 3254 6261
IWMP-DPR,Ithikara Block Panchayat 2012
27
(iv) LF 32 40 72 6 15 21 13 16 29
Total 10683 11297 21980 164 178 342 5108 5399 10507
6 Neelam-thazham
97
(i) Landless 133 128 261 13 12 25 69 67 136
2012 April-May
(ii) SF 1547 1599 3146 30 33 63 758 784 1542
(iii) MF 8425 8760 17185 247 291 538 3960 4117 8077
(iv) LF 97 123 220 6 4 10 40 51 91
Total 10202 10610 20812 296 340 636 4827 5019 9846
7 Kakka-thoppu
104
(i) Landless 126 129 255 49 72 121 65 67 132
2012 April-May
(ii) SF 1367 1413 2780 120 119 239 670 692 1362
(iii) MF 8923 9245 18168 895 917 1912 4194 4227 8421
(iv) LF 49 75 124 14 16 30 20 31 51
Total 10465 10862 21327 10078 1124 2302 4949 5017 9966
IWMP-DPR,Ithikara Block Panchayat 2012
28
Type of Household Cooking Fuel
Mylakkadu
Meenadu 1
Meenadu 2
Kakkathopu
Neelamthazham
Plakkadu
Uppukadavu
electrified houses 4475 3563 1570 4717 5302 5469 1927non-electrified houses 46 18 5 27 25 26 18
0
1000
2000
3000
4000
5000
6000Household Electricity Facilities
Sl.No Name of Watershed Wood L.P.G Bio gas Electricity
1 Mylakkadu 2366 2098 23 34 2 Meenadu 1 2996 2072 8 27 3 Meenadu 2 550 910 5 110 4 Kakkathopu 1576 838 0 21 5 Neelamthazham 1819 3497 4 8 6 Plakkadu 2175 3278 18 24 7 Uppukadavu 1092 843 5 3
IWMP-DPR,Ithikara Block Panchayat 2012
29
Main institutions in the project Area
Sl no Assets Nos Sl no Assets Nos
1 Major Roads 24 8 Post office 7
2 Primary Schools 20 9 Nationalized Bank 13
3 Secondary Schools 13 10 Co-Operative bank 12
4 High Schools 5 11 Market 11
5 ITI,ITC 5 12 Agro-industries 34
6 Primary Health Centre 11 13 Milk society 21
7 Veterinary Hospitals 12 14 Anganvadis 43 (Source: Baseline survey-GPK)
II.11. Agriculture and Land Use
Ithikkara had once excelled both in dry and wetland agriculture. Till the recent past, agriculture remained a prestigious
occupation of the people of the areas. There was a time when a ‘worker’ implied an ‘agricultural worker engaged in paddy
cultivation’. Once in Adichanalloor Panchayat alone, 470.95 hectares was under paddy cultivation. But today it has shrunken to a
few hectares. Similarly, in Nedumpana Panchayat, 200 hectares of land was once under paddy whereas 1576 ha of land was under
dry land agriculture. But today agriculture is practiced only in limited and scattered areas.
The areas included under IWMP had witnessed tremendous changes in the agriculture sector during the last several years.
One major issue is the fragmentation of land for housing and industrial purposes. Diseases have also contributed to large scale
decline of agriculture in the area. Coconut cultivation has drastically reduced because of wide spread diseases, shortage of
labourers for crop maintenance and harvesting etc. Farm labourers became reluctant to work in the rice fields. A major section of
IWMP-DPR,Ithikara Block Panchayat 2012
30
the farmers and labourers, due to various reasons including increasing cost of cultivation, scarcity for labour, unorganised marketing
systems, incidence of pests and diseases etc, began turning their back on agriculture. On the other hand, uncontrolled sand mining
has resulted in the deepening of the river bottom. Environmental issues like salt water intrusion, water scarcity etc also had adverse
impacts on agriculture in the areas.
Agricultural Land Use in the Project Area
Sl No
Name of Watershed
Area (ha)
Paddy (ha)
Mixed Crops(ha)
Rubber (ha)
Built up
Land(ha)
Water logged
(ha)
Waste land (ha)
Coconut (ha)
Cashew (ha)
Paddy+ MC(ha)
1 Mylakkadu 807.7 - 131.83 17 179.41 25.72 20.84 309.85 101.85 22.5
2 Meenadu 1 674.8 - 125.25 - 26 - 23.51 483.20 - 16.84
3 Meenadu 2 472.8 1 35 1.86 20 120 85.74 135 - 74.2
4 Plakkadu 935 1.53 215.08 54.53 34 117.26 - 491 - 21.6
5 Kakkathoppu 858.7 15 443.02 17 20 36.13 4.54 187.8 - 135.21
6 Nelamthazham 907.6 38.8 577.42 9.07 4.14 41.94 48.9 101.07 - 86.26
7 Uppukadavu 260.4 - 24.88 - 6.83 39.32 40.95 137.93 10.49 -
(Source: Krishibhavan data, baseline survey & PNP-GPK)
IWMP-DPR,Ithikara Block Panchayat 2012
31
Productivity of major crops Crop Productivity
Coconut 5256 nuts/ha
Tapioca 28911 kg/ha
Vegetables 1400 kg/ha
Banana 25t/ha
Rubber 1375 kg/ha
Pepper 800 kg/ha
Areca nut 15490 N/ha
Paddy 2308 kg/ha
IWMP-DPR,Ithikara Block Panchayat 2012
33
II.12. Animal Husbandry and Dairying Current status of livestock management in the watersheds is not promising. The farmers have turned to the rearing of new
breeds for better income. Local breeds have almost been discarded by them. Fragmentation of land, changes in land use pattern,
non availability of local paddy straw etc are also to be considered as reasons for the sparing of the local cattle breeds.
On the other hand, the cost of maintenance of the new breeds is very high. This has started dissuading the farmers from
livestock management. But livestock has to be considered one of the major sectors in the context of the identified watersheds as the
communities are by and large depending on external markets for milk. If the interested individuals and social groups in the area are
properly motivated, assisted and trained in proper livestock management, the watersheds can become self-sufficient in the case
milk.
This Project explores the possibilities of livestock development in the area under its Livelihood and Production Systems
Components. Interested persons are oriented to act in groups instead of venturing individually and in a scattered manner.
Livestock population in the Project Area
Sl.No Watershed Cow Buffalo Pig Goat Cock 1 Mylakkadu 1391 22 19 3142 8420
2 Meenadu 1 1130 10 0 1090 14500
3 Meenadu 2 310 10 0 292 950
4 Kakkathoppu 2591 135 0 3210 6178
5 Neelamthazham 420 52 0 392 1288
6 Plakkadu 1220 12 0 1350 15800
7 Uppukadavu 60 4 0 250 390
IWMP-DPR,Ithikara Block Panchayat 2012
34
II.13. Soil Soil types vary in the watershed from the red colour soil (Laterite soil) to sandy loams. The slopes are prone to erosion. The
following table illustrates the soil types of the watershed and locations of each soil category
SOIL TYPES IN ITHIKKARA, MUGHATHALA, KOTTARAKARA BLOCK (OLD TERMINOLOGY) Blocks Type of Soil Details of location
Ithikkara, Mukhathala Kottarakara
Sandy loam Mukhathala, Adhichanalloor, Poothakkulam
Laterite soil Kareepra, Chathannoor
Maping Unit Description Major Soils Major soils Inclusions
SOILS OF THE LOW LANDS
K07
Very deep, well drained, gravelly clay soils on gently sloping costal laterites, with moderate erosion, associated with very deep, well drained, gravelly clay soils with moderate surface gravelliness
clayey-skeletal, kaolinitic kandiustults clayey-skeletal, kaolinitic kanhaplustults
loamy-skeletal, Mixed ustoxic Dystropepts clayey, kaolinitic kandiustults
SOIL OF THE MIDLANDS
K12
very deep, well drained, gravelly clay soils with moderate surface gravelliness on gently sloping midland laterites with valleys of southern Kerala, with moderate erosion; associated with very deep, well drained, clayey soils
Clayey-skeletal, Kaolinitic,Ustic Kanhaplohumults Clayey, kaolinitic, Typic Kandiustults
Fine-loamy, mixed, Aquic Ustifluvents Clayey-skeletal, Kaolinitic,Typic Kanhaplustults
Source : Kerala State Land use Board
IWMP-DPR,Ithikara Block Panchayat 2012
37
Budget
Project Component
Micro watersheds and Treatable Areas 612c
907.6 Ha 612a
935.0 Ha 612k 858.7Ha
611b 807.7 Ha
6123a 674.8
6123c 472.8
6124a 260.4
Amount in Rs Administration. 7,375,500 1,361,400 1,402,500 1,288,050 1,211,535 1,012,260 709,185 390,570 Monitoring 737,550 136,140 140,250 128,805 121,154 101,226 70,919 39,057 Evaluation 737,550 136,140 140,250 128,805 121,154 101,226 70,919 39,057 Entry Point Activities 2,950,200 544,560 561,000 515,220 484,614 404,904 283,674 156,228 capacity building 3,687,750 680,700 701,250 644,025 605,768 506,130 354,593 195,285 DPR Preparation 737,550 136,140 140,250 128,805 121,154 101,226 70,919 39,057 Watershed works 41,302,800 7,623,840 7,854,000 7,213,080 6,784,596 5,668,656 3,971,436 2,187,192 Livelihood Activities 6,637,950 1,225,260 1,262,250 1,159,245 1,090,382 911,034 638,267 351,513 Production System& ME 7,375,500 1,361,400 1,402,500 1,288,050 1,211,535 1,012,260 709,185 390,570 Consolidation Phase 2,212,650 408,420 420,750 386,415 363,461 303,678 212,756 117,171 73,755,000 13,614,000 14,025,000 12,880,500 12,115,350 10,122,600 7,091,850 3,905,700
II.14. Capacity Building and IEC
One of the main aspects of IWMP consists in the building up the capacity of the watershed community to plan, implement,
monitor and evaluate various development activities under the watershed project. Tentative Action Plans for the purpose have been
prepared. Trainings in the Technological, Administrative and Financial aspects of the project have been conceived in the schedules.
Various stakeholders related with the project shall comprise the clientele groups to be trained. IEC principles are also taken into
account along with the capacity Building process.
IWMP-DPR,Ithikara Block Panchayat 2012
38
Training Programme
Sl No Subject Title Target Group Year wise Budget (in Lakhs)
I II III IV Total
1 Features of IWMP General people and Watershed Committee and officials
1.25 1.50 0.50 0.50 3.75
2 Production Systems Management
SHGs, UGs and Beneficiaries 1.25 1.00 1.00 0.50 3.75
3 Watershed Management: Concept and Approach
Watershed Committee and Officials 1.00 1.00 0.50 0000 2.50
4 Roles and Responsibilities Peoples’ Representative of PRIs
District , Block, Grama Panchayat Members
1.50 0.50 0.50 0000 2.50
5 Concept of Watershed Management and Sustainable Development
Implementing Officers, other officials and stake holders
1.00 0.50 0.50 0000 2.00
6
Management ofLivelihood Support Systems . Book Keeping, Accounting and Auditing
User Group, SHGs, Watershed Committees
1.00 1.50 1.00 0000 3.50
7 Management of Revolving Fund and Financial Discipline
SHGs 1.00 1.00 0.50 1.00 2.50
8 Exposure Visit SHGs, Watershed Committees, UGs 1.00 1.00 0.50 2.50
9 Micro Enterprises and Value Addition UGs and SHGs 0.5 0.75 0.50 0.25 2.00
10 Livestock Management for economic growth
SHGs , UGs and Beneficiaries 0.5 0.75 0.50 0.25 2.00
Total 10 9.5 6 1.5 27.00
IWMP-DPR,Ithikara Block Panchayat 2012
39
Information Education and Communication (IEC) Plan
1
Programme for generating awareness in Watershed Concepts among Students. (Slide shows, Presentations, Competition Programmes etc)
Educational Institutions
1.00 1.00 2.00
2 Road Shows Public 0.50 0.50 1.00
3 Use of Posters, Sickers, Banners , Calendars, Slides etc
Community 1.00 0.50 0.50 2.00
4 Hand Books, Broachers Community 1.00 0.50 0.50 2.00
5 Quiz Programmes, Competitions and Melas
Students, Youth, Women etc 0.50 0.50 0.50 0.50 2.00
Total 2.5 3.00 3.00 0.50 9.00
II.15. Entry Point Activities
Seven Entry Point Activities have been selected in connection with this project. The execution of the EPAs shall be a valuable
lesson and experience for the concerned communities in the participatory aspects contained in the mode of implementation
stipulated for various development activities envisaged under IWMP. The PRA and FGD etc were very useful in the process of
identifying the EPAs too. The details of EPAs are tabulated hereunder.
All of the Works identified as Entry Point Activities are related with the protection and development of water sources in the
project area. Works required for the development of certain streams and ponds have been included under this. Some wells have
also been identified for providing with them suitable measures to enhance recharging. These works will be very much beneficial to
IWMP-DPR,Ithikara Block Panchayat 2012
40
most of the members in Groups. These water sources developed under this component can be utilized for raising suitable crops
including vegetables in the adjoining land holdings. Each of these works will be carried out by the concerned Users’ Group and Self
Help Groups constituted for the purpose. These Groups will continue to maintain and manage these structures during the post
project period also.
Entry Point Activities
Sl.N0 Watersheds Panchayat Ward Particulars of work Amunt in Rs
01 Neelamthazham Nedumpana 12 Rising of bank and putting up of ring bund for the Pond 2,15,000
02 Plakkad Nedumpana 13 Construction of retaining wall in Chalakkara colony thodu 3,47,000
03 Kakkathopp Pooyappally 1 Renovation of Alamonchira in ward 1 of Pooyapally Gp 4,20,000
04 Mylakkad Adichanalloor 13 Construction of side wall for Moozhiyil thodu 5,00,000
05 Meenad I Chathannoor 12 Construction of side wall for Chathannoor- Meenadu thodu 4,23,000
06 Meenad II Chirakkara 13 Side wall of thodu near Anchampoika Pump house 1,10,000
07 Uppukadav Chirakkara 15 Construction of Side wall for kallamkodi poika vadakkathu 4,00,000
08 Well recharge in all watersheds 5,35,200
Total 29,50,200
IWMP-DPR,Ithikara Block Panchayat 2012
42
II.16. Major Problems in the Project Area Following are some of the general issues noticed in the area.
Land degradation due to soil erosion and fall in productivity Excessive runoff during monsoons leading to loss of water from the area
Ground water depletion due to poor recharge
Scarcity for water in the area during off monsoon period
Water sources get damaged due to poor management of them
Advancement of Gullies and encroachment of drainage courses
Environment pollution caused by poor waste management and uncontrolled application of agro-chemicals
Uncontrolled conversion and fragmentation of land
Biodiversity degradation
Neglect of Common property resources in the area
Salt water intrusion during peak summer in the tail end of the project areas.
Uncontrolled sand and mud extraction from streams and wetlands
Scarcity for agricultural labourers
Fallowing
Agriculture and allied sectors becoming unremunerative due to high cost of production and incidence of pests and diseases
Unorganized farmers and inconsistent production systems
Non availability of various critical inputs required for improving the production aspects of agriculture and allied areas.
IWMP-DPR,Ithikara Block Panchayat 2012
43
II.17. Major NRM Interventions Proposed The following are some of the major interventions proposed in this area with a view to conserve and develop the natural
resources. Rain Pits /Recharge Pits
Pits of appropriate dimensions are made at suitable locations in the watersheds for augmenting recharge of ground water
through enhanced percolation of rain water. These pits may also be termed as rain pits. This is an intervention suitable for areas
with moderate slopes. Plant Basins can also act as efficient recharge pits. Number and spacing of the pits shall be conducive to the
land use in each holding. Rain pits are not recommended for areas with higher and for locations under water logging.
Trenches
Contour or stagerred trenches can be formed in moderately sloping lands to trap run off. The excavated soil shall be used to
shape an embankment along the downstream edge of the trench. This embankment shall be planted with suitable plants including
fodder.
Terracing
Terracing is a practice of leveling land for minimizing soil erosion and excessive run off. The intervention helps in enhancing
recharge of ground water. Usually table top, inwardly inclining and outwardly inclining are the three types of terraces in our areas.
Inwardly inclined terracing shall not be practiced in steep slopes and in landslide prone areas. Narrow terraces are recommended
for higher slopes and wider terraces are suited in moderate slope. But practice of forming Terraces in highly sloping areas shall be
discouraged for the threat of landslides/slips.
IWMP-DPR,Ithikara Block Panchayat 2012
44
Jungle Stone Pitched Contour Bunds
Stone Pitched Contour Bunding is one of the widely accepted interventions for soil and water conservation in the areas where
the stone material is locally available. It is cost effective and simple to construct. In lands with higher slopes graded stone bunds are
preferred to eliminate chances of landslides/slips. Generally, Stone Pitched Contour Bunds are recommended for slopes between
20 % and 30 % with excessive run off. Spacing of the bunds shall be determined on the basis of the slope factor. These bunds need
to be reinforced with appropriate vegetative sps like fodder grass, pineapple suckers, vetiver, stylosanthus etc.
Earthen Bunds
Earthen bunds of varying dimensions are proposed for slopes upto about 20% with appropriate vegetation. In higher slopes
earthen bunds may not last and may require frequent and costly maintenance. Earthen bunds are to be provided along contours.
They can also be made in the form of Column Bunds, Batter Bunds, Circular Bunds, Crescent Bunds etc as the local conditions
permit.
Live Fences
Live Fencing is a multi-purpose method with regard to conservation and development of soil. Selection of suitable sps will
provide green manure for enriching soil. Live fences can control evaporation from topsoil due to the action of hot air during summer.
Also, the fence can control to a considerable extend destructive encroachment of stray animals etc into farm lands. Improvement of
biomass and protection of vegetation/crops from various pests by hosting for natural predators are other important attributes of the
intervention. Cassia, Hibiscus, Lettuce, Glyricidia, Vetiver etc can be tried as per local preference and suitability with land land use.
IWMP-DPR,Ithikara Block Panchayat 2012
45
Tree Basins
Formation of tree basins is an effective method to enhance conservation of rain water in a tremendous and effective manner.
The basins shall be designed on the basis of the tree/plant. However it shall catch maximum water from the canopy. Basins are
normally circular. But in sloppy lands it may be crescent shaped. The berms around the basin shall be reinforced with suitable
vegetation. Mulching can also be adopted in the plant basins for controlling evaporation loss. This practice will also augment
productivity of the trees/plants in a substantial manner.
Gully Plugging
Appropriate Gully control measures are to be adopted in the watersheds for checking the loss and deterioration of land
resources in the areas. Widening and deepening of gullies, breech of the gully banks, damage caused by gullies to adjoining land
etc need to be controlled under the watershed development projects. Cross Bars, Stone Checks, log Checks, Brushwood Checks,
Live Checks, Flow Trap pits/Sinks, side protection measurers etc are to be considered for the purpose. As far as possible,
vegetative support is to be provided to the Gully Banks instead of bluntly choosing structural works.
Renewal of Old Stone Bunds
Renewal of old stone bunds could be done by replacing the loose packing of stones of the top layers. The renewal work shall
be limited to a height of 45 cm in the damaged upper part of the old but otherwise stable Bunds. Such Bunds, after repair, shall be
supported with suitable vegetative sps.
IWMP-DPR,Ithikara Block Panchayat 2012
46
Compost Pit
The topsoil of a large extent of agricultural land in the watersheds has lost its quality with respect to water holding capacity
and productivity due to depletion in its organic matter content. The practice of organic mannuring needs to be popularized in the
areas to overcome this setback. Maximum households in the identified watersheds shall be motivated to the production of compost
from organic wastes from the household premises and the farm lands. This will serve the dual purposes of the disposal of organic
waste and the production of compost material for enhancement of the quality and productivity of soil in the locations. 3x1.5x1m shall
be the typical size of a compost pit. But the dimensions can vary according to the site conditions.
Vermi Compost
Vermi compost is an effective method for making better compost material at the house hold level. The seepage water from
the tank is a good source of nutrients and can be collected in a container and can be sprayed to crops.
Well Recharging
Water scarcity is one of the major problems in the watershed area during summer. Years of neglect of the of water
conservation practices in the area have caused this problem. Though the watershed receives about 2500 mm rain fall annually,
water scarcity is acute in most of the areas. Most of the wells in the upper areas of the watersheds remain dried up for months
together every year. This is an indication of the lowering of water table in the areas due to poor recharge. Additional measures to
recharge the wells can be taken up in the area to solve the problem. Recharge pits of appropriate dimensons made at suitable
locations adjacent and upstream to the affected wells so that recharge to the wells can be augmented. Inoculating surface water
direct to ground water shall be technically restricted as water containing dissolved pollutantas might cause serious pollution of groud
water. As such, diverting filtered roof water direct into the wells is not normaly encorraged under this project. But the practice of
IWMP-DPR,Ithikara Block Panchayat 2012
47
diverting clear and pure surface water through some kind of appropriate filtering machanisms like layers of charcoal, pebbles, gravel
and sand can be adopted in the case of wells located in areas faceing the problem of salt water intrusion for flushing. Hot box
This project advocates propagating use of non-conventional energy in the watershed households. This practice
will be economic, eco-friendly and pollution-free. As an opening, the project suggests to motivate households to make use of hot
boxes also in cooking. It will help moderating the use of petroleum gas product and firewood in cooking.
Production Systems and Micro Enterprises
Banana Cultivation
Banana cultivation is a promising activity for farmers in the light of new agricultural scenario. Banana has duel potential as a
raw fruit and processed items such as Banana powder, chips and other associated products. The organic wastes available from the
household if composted can be used as manure for the crop. The existing waste land can be made productive through banana
cultivation. For Kudumbasree units as well as self help groups, this is an appropriate income generation programme. One important
point to be emphasized in the cultivation process is to minimize the use of chemical fertilizers and pesticides in the field. The focus
should be on organic methods.
Coconut farming
Though the name Kerala is linked much with the “Kera” (coconut), a pride of every Keralite, the status of kera is getting bleak over the years. It is facing a severe crisis across Kerala. One of the major issues is the disease like Kattuveezhcha (Root wilt) and coconut mite attack. Lack of good quality seed materials and higher charges of coconut pluckers are another threat
IWMP-DPR,Ithikara Block Panchayat 2012
48
for the sustenance of the crop. On the other hand, coconut and coconut products have great market in India and abroad. Nearly 30 different products are currently made out of coconut and its palms. It is one of the highly benefitting commercial crop. To revive this crop, there needs to be multi pronged approaches such as controlling of diseases, supply of new seedlings, irrigation facilities, training on coconut climbing etc. Along with these, new employment opportunities, new business ventures could be generated.
Tuber Crops
Tubers are one of the nutrient rich food supplements that are in great demand for consumption. Cultivation of tubers is a best strategy to increase productivity by utilizing the wasteland as well as inter-space between crops. This crop could also be cultivated in existing mono-cropping areas. Tubers have other advantage such as; it can be grown organically and is one of the food crops categories that are free from pesticide contamination. Farmers can use organic waste for cultivating tubers. It is also relatively free from diseases which are major threat in many other crops. Cultivation of tubers also improves soil quality through better aeration as well as addition of organic matter by way of decomposing leaves and plant materials. Tuber crop promotion is an important activity in the watershed area.
Vegetable Cultivation
Keralites are fully depending on other states for vegetables. These vegetables that arrive from the neighboring states are highly contaminated with toxic compounds through the pesticide applications. As a result, the Keralites are increasingly getting affected with diseases. Though Kerala is blessed with suitable environment like availability of water, prolonged monsoon, etc for the production of many vegetables, there is an apparent lacking of interest among people to cultivate vegetables. Vegetable cultivation is an easy job for those who are interested. A variety of vegetables could be cultivated either in rooftops, carry bags, back yards or in pots. It could also be upgraded to commercial level. People could cultivate them on group basis also on lease land or on own lands. Vegetable cultivation is also an important activity to conserve our traditional varieties of vegetables. Promotion of vegetable cultivation is an important component in the programme.
IWMP-DPR,Ithikara Block Panchayat 2012
49
Livelihood Support Systems Tailoring Units
It is a much demanded and profitable craft that can be practiced at household and group level. The benefit of this program
should be made available to young ladies who have been trained in this craft. The selection of beneficiaries of this must be on the
basis of the principles and practices envisaged in the related guidelines issued by SLNA for the purpose. Required grading and
ranking of the Groups shall be done on the basis of their performance before identifying the beneficiary groups for providing
assistance under the livelihood component. Required marketing system for selling the products/service shall be worked out through
the combined efforts of PIA, WDT and Watershed Committee before commencing the livelihood systems..
Poultry Units
Back yard Poultry is identified as a potential livelihood for the poor househols in the project area. Interested Self Help Groups
can be motivated to take up small poultry units under this project. Groups consisting of members from landless, SC/ST, OBC, BPL
etc categories shall get preference in the process of selecting eligible Groups
Rabbit rearing
Rabbit rearing is turning out to be a very lucrative entreprise now as the demand for rabbit meat is ever in the increase.
EligibleSelf-Help Groups identified on the basis of performance grading and ranking can be given assistance under this project as
per provisions in the guidelines.
IWMP-DPR,Ithikara Block Panchayat 2012
50
Goat Rearing:
Goat Rearing on homestead and group basis is a profitable livelihood activity that can support thr rural poor in the project
area in enhancing household income in a sustainable manner As the gestation period is short and the number of the lambs per
litter is usually two or more, goat rearing can be a very useful income generating livelihood for the area.Groups eligible on the basis
of grading and ranking can be given assistance under the project as per the guidelines.
Coconut climbing devices:
The shortage of skilled labourers for undertaking the harvest of coconuts has grown as a big problem faced by coconut
growers in the area. Providing the interested Community Groups with adequate number of the climbing device developed by certain
agencies on the basis of the recognition of the Dept of Agriculture can be a great relief to the affected farmers.Interested persons
from concerned Self Help Groups can be given required training in using the device. This can be a source of income for those
members working in association with concerned Self Help Grpoups.
Cattle shed.
Concern and conditions for hygene is considered as very important aspects of good Livestock Management Systems.Clean
and convenient cattle sheds are indispensible for making livestock management by the SHGs attractive, safe and profitable. But,
many of the cattle sheds in the area are found to be in an unhygienic and dilapidated condition. Hence this program envisages a
plan to provide clean and hygienic cattle sheds to the promising farmers in the locality involved in cattle rearing. Assistance under
this project is provided on Group basis as seed money.
IWMP-DPR,Ithikara Block Panchayat 2012
51
II.18. Convergence
Since IWMP contains the perspective of holistic development of the watersheds and the related communities, the project fund
derived on the cost structure followed for the programme may not be sufficient to take up all activities inevitable for realizing the
objectives conceived. Under the circumstance, it becomes essential to converge suitable components from other ongoing parallel
programmes of the State and Central Governments operationalised in the areas with the action plans of IWMP for better and more
sustainable results. In fact, the scope of Convergence of IWMP and MGNREGS is wonderful.
So also, components from projects implemented in the areas by the development agencies/departments like Soil and Water
Conservation, Minor Irrigation, Agriculture, Animal husbandry, Dairy Development, Fisheries, Social Forestry etc can be very
effectively converged on the IWMP platform. Support of Literacy Mission, KudumbaSree etc. can also be utilized for making IWMP
more participatory, inclusive and effective.
The Neighborhood Groups, Self Help groups, Users Groups, Watershed Committee, the related officials, the PRIs etc need
to take joint initiative to work out a Convergence Plan for the areas. The Block Level Coordination Committee can take very effective
steps in this line. More effective convergence plan can be evolved through an elaborate PRA process on the neighborhood area
basis. This will also help formulating more realistic and need based labour budgets for MGNREGS with long term applicability and
acceptability in the concerned areas.
Annual Action Plan SL No Activities (NRM) unit
Rate in Rs Physical Financial
Ist year IInd year IIIrd year Ivth Year Physical Financial Physical Financial Physical Financial Physical Financial
IWMP-DPR,Ithikara Block Panchayat 2012
52
A LandDevelopment
1 Agroforestry Nos 60 25,300
1,518,000
5,060
303,600
8,855
531,300
6,325
379,500
5,060
303,600
2 Live Fencing RM 50 15,318
765,900
3,063
153,150
5,361
268,050
3,830
191,500
3,064
153,200
B Soil & Moisture Conservation
-
-
-
-
3 Earthen Contour Bund RM 25 167,450 4,186,250 33,490
837,250
58,608
1,465,200
41,862
1,046,550 33,490
837,250
4 Stone Contour Bund M2 145 29,850
4,328,250
5,970
865,650
10,447
1,514,815
7,463
1,082,135
5,970
865,650
5 Bit Trenches RM 80 19,250
1,540,000
3,850
308,000
6,736
538,880
4,814
385,120
3,850
308,000
6 Agrostology Along Contour RM 8.8 118,550
1,043,240 23,710
208,648
41,492
365,130
29,638
260,814 23,710
208,648
C Gully Plugging - - - - 7 Check Dam Nos 7500 653 4,897,500 130 75,000 229 1,717,500 163 1,222,500 131 982,500
8 Cross Bar Nos 4000 396
1,584,000
79
316,000
138
552,000
100
400,000
79
316,000
D Water Harvesting Structure ( WHS) New
-
-
-
-
9 Recharge/ Percolation Pits M3 118
27,100
3,197,800
5,420
639,560
9,485
1,119,230
6,775
799,450
5,420
639,560
10 Well Recharge Structure Nos 10000
205
2,050,000
10
100,000
145
1,450,000 40
400,000
10
100,000
10 Rain Water Tank Ltr 6 325,000
1,950,000
15,000
90,000
145,000
870,000
145,000
870,000
20,000
120,000
D2 Rennovation -
-
-
-
11 Stream Bank Protection (Structural) RM 2100
3,655
7,675,500
180
378,000
1,565
3,286,500
1,530
3,213,000
380
798,000
12 Bank Stebilization RM
IWMP-DPR,Ithikara Block Panchayat 2012
53
(Vegitative) 596,762 - 202,500 225,000 169,262
13 Pond Nos
1,700,000 -
650,000
1,050,000
14 Stream Desiltation M3 15,000
-
15,000
-
-
15 Well Renovation Nos 711,810
-
117,810
474,000
120,000
E Others -
-
-
-
16 Compost Tank (NADP Model) Nos 5000
258
1,290,000
52
260,000
90
450,000
64
320,000
52
260,000
17 Biogas Unit (Portable) Nos 13500 162
2,187,000
32
432,000
54
729,000
42
567,000
34
459,000
18 Culvert (others) 1
50,000
1
50,000
Add for unforseen items and rounding 15788
-
-
-
15,788
Total
5,866,858 15,892,915
12,886,569
6,656,458
Note: AAP prepared including Beneficiary contribution
II.19. Watershed Development Fund (WDF)
A separate fund called Watershed Development Fund-WDF- is maintained under the project. One of the mandatory
conditions for the selection of Watersheds under the programme is the readiness of the concerned watershed community to
contribute to the Watershed Development Fund (WDF). All the receipts including the beneficiary contribution from the watershed
community shall be deposited in the WDF. In the case of contributions in kind and labour, amount equal to the value of the same
shall be drawn from the Project Fund Account and deposited in the WDF. A clear procedure with regard to the management of the
WDF during the Post Project Period shall necessarily be laid down in the consolidation phase itself.
IWMP-DPR,Ithikara Block Panchayat 2012
54
II.20. Outcomes Expected from the Project Sl.No Particulars Expected Result
1 Additional Area brought Under Agriculture 180 Ha 2 Additional Area brought Under Irrigation 978 Ha 3 Extent of Waste Land brought Under Cultivation 45 Ha I Production of Different Crop 1 Coconut 367500 nos 2 Vegetable 144 MT 3 Tapioca 1192 MT 4 Elephant Foot Yam 150 MT 5 Banana 236.6 MT 6 Colocacia 30 MT 7 Tuber Crop 6 MT 8 Increase in Ground Water level 1 m 9 Seasonal Streams turn Perennial 11 Stream II Live Stock Population 1 Goat 114 Nos 2 Poultry 1748 Nos 3 Rabit Unit 19 Nos 4 Duck 128 Nos III Micro Enterprises 1 Tailoring Unit for Women 57 Nos 2 Mushroom Units for Women 23 Nos 3 Fish Processing Unit for Land Less People 7 Unit 4 Ornament making unit 2 Nos 5 Banana Chips Unit 1 6 Ornamental fish culture unit 90 7 Tender Coconut Stall for Land Less People 3 Units IV Area developed through Soil and Water Conservation 1500 Ha V Expected Employment generation from project interventions 30000 Mandays
IWMP-DPR,Ithikara Block Panchayat 2012
55
II.21. Exit Protocol
Watershed Development Fund is the main source of financial assistance for the post implementation period of the watershed
development project. This account is distinct from the Watershed Project Account opened by the Watershed Committees (WC).
Peoples’ readiness to contribute is one of the mandatory conditions for the selection of villages for watershed project. The
contribution to WDF shall be a minimum 10 % of the cost of NRM works executed in private land holdings. In case of SC/ST, small
and marginal farmers, the minimum contribution shall be 5 % of cost of NRM works executed in their land.
Such contributions would be accepted either in cash at the time of execution of works or as voluntary labour. A sum
equivalent to the monetary value of the voluntary labour contributed by the concerned persons or groups shall be transferred from
the Watershed Project Account to the WDF. User Charges and other amounts generated and collected under the project including
income earned from assets created under the project on common property resources etc shall invariably go to the WDF. Beneficiary
contribution against grant given under Production Systems Management shall also be credited to WDF. Minimum of such
contributions shall be 10 percent for general category and 5 percent for SC/ST beneficiaries. The will meet the cost of farming
system activity to a maximum limit of project funds admissible under the Production Systems management shall be an amount equal
to double the unit cost of the concerned project (i.e. Rs 15,000X2/12,000X2 per ha as the case may be).
The Secretary, Watershed Committee (WC) shall maintain separate Accounts and Records in respect of the WDF. Rules for
operation of the fund should be prepared by the Watershed Committee (WC) and approved by the Watershed Gram Sabha. The
WDF bank account will be operated by the President of the Gram Panchayat and any implementing officers from the Grama
Panchayat as designated by necessary Govt. orders. The basics directives as laid down in the Common Guidelines for Watershed
Programmes issued by the GoI shall not normally be overlooked. Nodal Ministry may also evolve appropriate protocols for the
management of the WDF by the concerned watershed community.
IWMP-DPR,Ithikara Block Panchayat 2012
56
II.22. Important Phases and Processes involved in the preparation of the DPR 22-9-2011
First meeting with the Project Manager of the District was held on 22nd September 2011. Various aspects of IWMP and the
Batch II Watershed Projects in the district were discussed in detail.
29-9-2011
Afterwards, a meeting of all the elected members of the Local Self Governments related to the cluster of watersheds was
held on 29.9.2011. Many of the officers of the line departments also attended the meeting.The Project details were explained in the
meeting.
1-10-2011 to 30-10-2011
Cadastral maps of the Nedumpana, Adichanalloor, Chathanoor, Thrikoilvattam, Chirakkara, Poothakulam, Mayyanadu,
Kareepra, Pooyappally watersheds were collected from the concerned village offices and from the state level office of survey and
land records during the period. Also, the boundaries of the micro watersheds included in the cluster were demarcated in the
cadastral maps.
Identification of watershed boundaries in the field
Later on, a team comprised of various stakeholders of the project at field level including the elected members of the
Panchayats visited all the seven Micro Watersheds in the cluster. During the visit, the members of the team themselves got
familiarized with the watershed boundaries in the field with the help of the cadastral maps. The visit was very useful as the team
IWMP-DPR,Ithikara Block Panchayat 2012
57
could get a clear picture of the status of various aspects of the project areas. Then the maps were digitized watershed wise for
properly using them in the processes involved in the preparation of DPR.
Workshop at Grama Panchayat level
A series of workshops were conducted at Gram Panchayat and Block Panchayat levels to sensitise the elected
representatives of Local Bodies in the concept of IWMP and Watershed Projects under it. Some of the local persons volunteered to
associate with the projects and related officers from the PIA Block also attended the workshops along with the elected members.
The workshops were held during the period from 9-11-2011 to 7-12-2011 at Adichanlloor, Nedumpana, Chatahnoor, Chirakkara,
Poothakkulam, Thrukovilvattam, Pooyappally, Kareepra, Mayannad Grama Panchayats. These workshops were very useful as the
participants could get familiarized with the concept behind ‘watershed based development’.
Later on, two additional programmes were conducted at the Ithikkara Block office for the members who failed to participate in
the earlier workshops. The first of the additional workshops was conducted for the members from Adichanalloor, Chathannor,
Poothakulam, Chirakkara and Pooyappally Gram Panchayats. Members from Mayyanad, Nedumpana, Thrukovilvattam and
Kareepra GramaPanchayats attended the second one.
Formation of Panchayat level Watershed Committee
A meeting was held in each Panchayat and the Watershed Committees were formed in the meetings. Members of the
Panchayat, Block Development Officer, representatives of the PIA and representatives of the TSO participated.
IWMP-DPR,Ithikara Block Panchayat 2012
58
A field survey covering all the wards of the Panchayat that falls in each watershed area was conducted during this period to
demarcate the boundaries and to share information on how to form Self Help Groups or Neighbor Hood Groups in each of the
wards. This field study was also helpful in understanding the field conditions of the watershed areas.
Transect walk
A transect walk was conducted in the watershed to identify problems and opportunities prevailing at various locations of the
watersheds. Ward members also participated in the transect walk which provided much insight into the problems faced by people as
well as the quality and into the status of natural resources of the watershed area.
Formation of Self Help Groups
Self Help Groups were formed in each Grama Panchayat related to the watershed cluster. This was done by organising 50
neighboring families into Neighborhood Groups. The service of two facilitators was used for the purpose after giving them required
trainings. Elected members and TSO team together with the fecililitators undertook the task of formation of Self Help Groups. The
process enabled the TSO to build up the maximum community support for the project.
Preliminary data collection
After forming the SHGS, detailed socio-economic survey was conducted at households’ level to generate the related data.
Also, one to one interviews were conducted with farmers, agriculture laborers and other local members to gather more details direct
from the stakeholders.
Secondary data collection
Secondary data were collected from the offices of the concerned Grama Panchayats, Agricultural Department, Animal
Husbandry Department, Diary Extension Offices and the related Village offices.
IWMP-DPR,Ithikara Block Panchayat 2012
59
Water Resources survey
An extensive survey of the water sources of the watershed (River, Streams, springs, Gullies etc) was conducted to get the
existing status of related parameters recorded for determining and incorporating appropriate measures and recommendations in the
DPR. Necessary markings were also made in cadastral map for proper references. Thus an intervention map was prepared.
Land use Map
A detailed land use map was prepared on the basis of the field conditions. Details gathered through the transect walks have
also been incorporated into this map.
Preliminary activities
This watershed project is featured with many essential activities which are beneficial to local people. These activities shall, no
doubt, attract people’s participation in the whole process. One of the major setbacks with the previous watershed projects was the
lack of people’s participation. But maximum participation from the community was ensured in almost all the processes involved in
the preparation of this document. The activities were done in a transparent and participatory way. It is well acknowledged that
People’s participation is the key factor that contributes greatly to the success of any watershed development programme.
Participatory Rural Appraisal
Several PRAs were conducted in various parts of the Project areas. All these PRAs were marked with elaborate people’s
participation. In this, social and resource maps, historic timelines, agricultural timelines and trends, Institutional pattern, Income and
expenditure of the families, inflow and outflow of income commodities/resources, climate change etc were discussed and mapped.
Local people pointed out agricultural problems and suggested many possible solutions. All these information were much useful for
the preparation of the DPR.
IWMP-DPR,Ithikara Block Panchayat 2012
60
Environment day and watershed development
On the World Environment Day, a public meeting was organized to highlight the importance of environment protection. Mr.
R.Manoj, president of the Block Panchayat presided over the function. Mr.Jayapal, MLA, Chathanoor constituency inaugurated it. A
painting competition in a theme on environment was conducted for children. Elected members of Grama Panchayats and Block
Panchayat participated in the function. The TSO representatives explained the IWMP in the public meeting.
Application of GIS
GIS support has been used to formulate this DPR with innovate technical values and in a proper manner. Computer aided
designing and drawing methodologies have been followed in developing various maps in the DPR. The information collected
through GPS and the field surveys were incorporated to the Cadastral maps obtained from the revenue department. All the seven
micro watershed areas were delineated digitally and maps for each watershed have been prepared separately. These maps have
been made a part of the DPR and the same can be used for future planning process.
Maps Prepared and included in the DPR
Watershed map
Panchayat map
Land use map
Soil type map
Slope map
Geomorphology map
Digital terrain map
IWMP-DPR,Ithikara Block Panchayat 2012
61
Intervention map.
Preparation of Detailed Project Report
The DPR was prepared after processing all the above mentioned information and consulting all stake holders. The systematic
surveys and application of GIS have helped to prepare the DPR in a more systematic way. Ithikkara Block Development Officer Mr.
Sanoj has reviewed the process periodically and given necessary pieces of advice. The elected members have cooperated well in
the process of preparing the DPR, especially in mobilizing people for participating in various activities.
IWMP-DPR,Ithikara Block Panchayat 2012
70
DETAILED ESTIMATE Name of watershed : Kakkathoppu
Name of work: Renovation of Alamonchira in ward 1 of Pooyappally Grama Panchayat.
Item No Description
Measurements Quantity Unit Amount
No Length Breadth Depth
1
Earthwork excavation for ordinary soil foundation DR work and excavated earth filled in low level
portion of the proposed site.
Foundation 1 22.00 1.00 0.60 13.20 m3 Foundation 1 40.00 1.00 0.60 24.00 m3 Foundation 2 15.00 1.00 0.60 18.00 m3 Foundation 1 30.00 1.00 0.60 18.00 m3
Step 1 3.20 1.90 0.45 2.74 m3 Total 75.94 m3 Say 76.00m3 @ Rs 1117/10m3 8489.00
2
Dry stone masonry for retaining walls including all cost conveyance etc complete
Foundation 1 22.00 1.00 0.60 13.20 m3 Foundation 1 40.00 1.00 0.60 24.00 m3 Foundation 2 15.00 1.00 0.60 18.00 m3 Foundation 1 30.00 1.00 0.60 18.00 m3
Superstructure 1 22.00 (0.90+0.60)/2 1.22 20.13 m3 Superstructure 1 40.00 (0.90+0.60)/2 1.22 36.60 m3 Superstructure 2 15.00 (0.90+0.60)/2 1.22 27.45 m3
IWMP-DPR,Ithikara Block Panchayat 2012
71
Superstructure 1 30.00 (0.90+0.60)/2 1.22 27.45 m3 Steps - Foundation 1 3.20 1.90 0.45 2.74 m3
1st step 1 3.00 1.80 0.30 1.62 m3 2nd step 1 3.00 1.50 0.30 1.35 m3 3rd step 1 3.00 1.20 0.30 1.08 m3 4th step 1 3.00 0.90 0.30 0.81 m3 5th step 1 3.00 0.60 0.30 0.54 m3 6th step 1 3.00 0.30 0.30 0.27 m3
Total 193.24 m3 Say 193.23m3 @ Rs 1726.40/m3 333592.00
3
Cement concrete 1:2:4 using 20mm broken stone including all cost conveyance labour charges etc
complete including formwork
Say 5856dm3 @ Rs 68.49/10dm3 40108.00
4
Bailing out water with 5HP engine and pump set including conveyance to the site and errection
cost of fuel lubricating oil pay of staff etc complete
Say 8 day @ Rs 1355/day 10840.00
5 Engaging man mazdor for site cleaning
Say 4 Nos @ Rs 377/E 1508.00 Total 394537.00
LS for taxes and unforseen items if any 25463.00
Grand Total 420000.00 ( Rupees Four Lakh twenty thousand only)
IWMP-DPR,Ithikara Block Panchayat 2012
72
Name of work : Renovation of Alamonchira in ward 1 of Pooyappally Grama Panchayat.
0.60
Cement Concrete 1:2:4
DR Masonry
1.22
0.90
0.60
1.00
RETAINING WALL - CROSS SECTION
(All dimensions are in metre)
IWMP-DPR,Ithikara Block Panchayat 2012
73
DETAILED ESTIMATE Name of watershed : Neelamthazham
Name of work : Rising of bank and putting up of ring bund for the pond in Nedumpana GP
Item No Description Measurements
Quantity Unit Amount No Length Breadth Depth
1
Rising and formation of the bank of existing pond in a height of 1.20 m and top width 0.80m and bottom width 1.50m including
formation etc complete as per specification. 1 200.00 200.00 m
Say 200.00m @ Rs 4188/10m 83760.00
2
Putting up ring bund to a top width of 1.50m and avg height of 2.00m with 1/4:1 side slope and protect the sides with 1/2 split coconut post 3.50m long driving down 1.50m below bed level at 60cm c/c, providing two rows of wailing pieces 1/4 split coconut post on both sides and 1/2 split cross ties to alternate posts and screening the sides with double new coconut cadjans over arecanut reepers 15cm c/c square mesh and tied with cadjans and inside filled with earth cut and conveyed with all leads and lifts including consolidating properly and maintaining the bund till the work is completed and removing the same after completion of the work(permanent ring bund) 1 30.00 30.00 m
Say 30.00m @ Rs 3093/1m 92790.00 Total 176550.00
IWMP-DPR,Ithikara Block Panchayat 2012
74
LS for taxes and unforseen items if any 11450.00 Grand Total 188000.00
( Rupees One Lakh Eighty Eight Thousand rupees only) DETAILED ESTIMATE
Name of watershed : Mylakkad Name of work : Construction of side wall for Moozhiyil thodu in Adichanalloor Grama Panchayat.
Item No Description
Measurements
Quantity Unit Amount No Length Breadth Depth
1
Earthwork excavation in hard soil and depositing on bank with initial lead upto 50m and lift up to 1.50 m
including breaking clods, watering ramming and sectioning of spoil bank etc complete
Retaining wall foundation 2 106.00 0.80 0.50 84.80 m3
Say 84.80m3 @ Rs 2356.25/10m3 19981.00
2
Dry stone masonry for retaining walls using departmental rubble etc complete Foundation 2 106.00 0.80 0.50 84.80 m3 Superstructure 2 106.00 (0.60+0.50)/2 1.20 139.92 m3 Total 224.72 m3
Say 224.72m3 @ Rs 1726.40/m3 387957.00
3
Cement concrete 1:3:6 using 20mm broken stone including all charges for cost conveyance, watering,
curing etc complete Top of retaining wall 2 106.00 0.50 0.10 10.60 m3
Say 10.60m3 @ Rs 59.48/10dm3 63049.00 Total 470987.00
LS for taxes and unforseen items if any 29013.00 Grand Total 500000.00
( Rupees Five Lakh only)
IWMP-DPR,Ithikara Block Panchayat 2012
75
Name of work : Construction of side wall for Moozhiyil thodu in Adichanalloor Grama Panchayat.
0.50
Cement Concrete 1:3:6
1.20 D.R. Masonry
0.50
0.60
0.80
RETAINING WALL - CROSS SECTION
(All dimensions are in metre)
IWMP-DPR,Ithikara Block Panchayat 2012
76
DETAILED ESTIMATE Name of watershed : Uppukadavu
Name of work : Construction of sidewall for Kallamkodi poyka vadakkathu in Chirakkara Grama Panchayat.
Item No Description
Measurements
Quantity Unit Amount No Length Breadth Depth
1
Earthwork excavation for ordinary soil foundation DR work and excavated earth filled in low level
portion of the proposed site.
Retaining wall foundation 2 86.00 0.60 0.40 41.28 m3 Say 41.28m3 @ Rs 1115.92/10m3 4607.00
2
D.R masonry for foundation of retaining wall (drain) Foundation 2 86.00 0.60 0.40 41.28 m3
Say 41.28m3 @ Rs 1922.75/m3 79371.00
3
Random rubble in cement mortar 1:8 for basement of retaining wall Retaining wall 2 86.00 (0.55+0.45)/2 0.90 77.40 m3
Say 77.40m3 @ Rs 3220.45/m3 249263.00
4 Cement concrete 1:3:6 using 20mm broken stone at top of retaining wall.
Top of retaining wall 2 86.00 0.45 0.07 5.41 m3 Say 5.41m3 @ Rs 61.34/10dm3 33185.00
Total 366426.00
IWMP-DPR,Ithikara Block Panchayat 2012
77
LS for taxes and unforseen items if any 33574.00 Grand Total 400000.00 ( Rupees Four Lakh only)
Name of work : Construction of sidewall for Kallamkodi poyka vadakkathu in Chirakkara Grama Panchayat.
0.45
Cement Concrete 1:3:6
R.R.Masonry in cement mortor 1:8
0.90
0.40
D.R. Masonry
0.55
0.60
IWMP-DPR,Ithikara Block Panchayat 2012
78
RETAINING WALL - CROSS SECTION (All dimensions are in metre)
DETAILED ESTIMATE Name of watershed : Plakkadu
Name of work : Construction of sidewall for Chalakkara colony thodu in Nedumpana GP.
Item No Description
Measurements
Quantity Unit Amount No Length Breadth Depth
1
Dismantling clearing away and carefully stacking materials useful for any thickness of wall;a opd dry
rubble work including disposal of debris within a distance 150m.
2 10 0.6 0.6 7.20 m3
Say 7.20m3 @ Rs 264.00/m3 1901.00
2
Earthwork excavation in ordinary soil in or under water for retaining wall etc complete
Retaining wall foundation 2 25.00 1.30 0.60 39.00 m3 Say 39.00m3 @ Rs 1117/10m3 4356.00
3 Dry stone masonry for retaining walls using departmental stone 60% of item no 1
Say 4.32m3 @ Rs 641.00/m3 2769.00
4
Dry rubble masonry for retaining walls Retaining wall foundation 2 25.00 1.30 0.60 39.00 m3 Superstructure 2 25.00 0.75 3.00 112.50 m3 Deduct dept rubble 4.32 m3
IWMP-DPR,Ithikara Block Panchayat 2012
79
Total 147.18 m3 Say 147.18m3 @ Rs 1726.00/m3 254033.00
5 Earth work filling with Contractors own earth cut and conveyed from available sources etc complete
2 25.00 0.30 2.50 37.50 m3 Say 37.50m3 @ Rs 2505.00/10m3 9394.00
6
Reinforced cement concrete 1:2:4 using 20mm broken stone for belt between DR masonry including (head load conveyance upto 200m) watering, curing etc
complete 2 25.00 0.75 0.10 3.75 m3 Say 3.75m3 @ Rs 80.60/10dm3 30225.00
7 Reinforcement for RCC work bent tied and placed in position etc complete as per specification
Say 170kg @ Rs 6339/qtl 10776.00
8 Cement concrete 1:2:4 using 20mm broken stone for wearing coat over DR masonry including (head load
conveyance upto 200m) watering, curing etc complete
DR masonry 2 25.00 0.50 0.05 1.25 m3 Say 1.25m3 @ Rs 66.60/10dm3 8325.00
Total 321779.00 LS for taxes and unforseen items if any 23221.00
Grand Total 345000.00 ( Rupees Three Lakh Fourty Five Thousand only)
IWMP-DPR,Ithikara Block Panchayat 2012
80
DETAILED ESTIMATE Name of watershed : Meenad I
Name of work : Construction of side wall for Chathanoor thodu in Chathannoor GP Item No Description
Measurements Quantity Unit Amount No Length Breadth Depth
1
Earthwork excavation in ordinary soil for foundation using the spoil to fill the inner side with an initial lead upto 50m and lift up to 1.50 m including breaking clods, watering
ramming and sectioning of spoil bank etc complete
Retaining wall foundation 1 12.00 0.70 0.50 4.20 m3 1 30.00 0.80 0.50 12.00 m3 1 110.00 0.80 0.50 44.00 m3 Total 60.20 m3
Say 60.20m3 @ Rs 1263/10m3 7603.00
2
Dry stone masonry for foundation of protection wall
Foundation 1 12.00 0.70 0.50 4.20 m3 Foundation 1 30.00 0.80 0.50 12.00 m3 Foundation 1 110.00 0.80 0.50 44.00 m3 Superstructure 1 12.00 0.60 1.30 9.36 m3 Superstructure 1 30.00 0.60 1.50 27.00 m3 Superstructure 1 110.00 0.60 1.50 99.00 m3 Total 195.56 m3
Say 195.60m3 @ Rs 1726.00/m3 337606.00
3 Cement concrete 1:3:6 using 20mm broken stone
IWMP-DPR,Ithikara Block Panchayat 2012
81
1 150.00 0.60 0.10 9.00 m3 Say 9000dm3 @ Rs 59.47/10dm3 53527.00
Total 398736.00 LS for taxes and unforseen items if any 24264.00
Grand Total 423000.00 ( Rupees Four Lakh twenty three thousand only)
Name of work : Construction of side wall for Chathanoor thodu in Chathannoor GP 0.60
Cement Concrete 1:3:6
1.30
D.R. Masonry
0.50
0.60
0.70
RETAINING WALL - CROSS SECTION (All dimensions are in metre)
IWMP-DPR,Ithikara Block Panchayat 2012
82
DETAILED ESTIMATE Name of watershed : Meenad II
Name of work : Protection of existing watershed near Anchampoyka pump house in Chirakkara Grama Panchayat.
Item No Description
Measurements
Quantity Unit Amount No Length Breadth Depth
1
Earthwork excavation for ordinary soil foundation DR work and excavated earth filled
in low level portion of the proposed site. 1 6.8 (0.8+0.45)/2 1.9 8.075 m3 1 6.7 (0.7+0.45)/2 1.6 6.164 m3
1 13.10 0.55 0.40 2.88 m3
Total 17.12
Say 17.00m3 @ Rs 1115.92/10m3 1897.00
2
D.R masonry for foundation all around retaining wall
1 6.80 0.80 0.40 2.18 m3
1 6.7 0.70 0.40 1.87 m3
1 13.10 0.55 0.40 2.88 m3
Total 6.93 m3
IWMP-DPR,Ithikara Block Panchayat 2012
83
Say 7m3 @ Rs 1922.75/m3 13459.00
3
Random rubble in cement mortar 1:8 for basement of retaining wall (all around)
Retaining wall 1 6.80 (0.8+0.45)/2 1.50 6.37 m3
Retaining wall 1 6.70 (0.7+0.45)/2 1.20 4.62 m3
Retaining wall 1 13.10 (0.55+0.45)/2 0.80 5.24 m3
Steps 12 1.30 0.30 0.18 0.84 m3
17.07
Say 17m3 @ Rs 3220/m3 54740.00
4 Cement concrete 1:3:6 using 20mm broken stone at top of retaining wall.
Top of retaining wall 1 26.60 0.45 0.08 0.89 m3 Say 1m3 @ Rs 61.34/10dm3 6134.00
5 Cement concrete 1:2:4 using 20mm broken
stone for floor inside bottom all labour charge curing etc complete
1 6.00 6.00 0.10 3.60 m3 Say 3600dm3 @ Rs 68.48/10dm3 24653.00
Total 100883.00 LS for taxes and unforseen items if any 9117.00
Grand Total 110000.00 ( Rupees One Lakh Ten Thousand only)
IWMP-DPR,Ithikara Block Panchayat 2012
84
Name of work : Protection of existing watershed near Anchampoyka pump house in Chirakkara Grama Panchayat.
0.45
Cement Concrete 1:3:6
R.R.Masonry in cement mortor 1:8 1.50
0.40
D.R. Masonry
0.80
RETAINING WALL - CROSS SECTION (All dimensions are in metre)
IWMP-DPR,Ithikara Block Panchayat 2012
85
Rough Estimate
Gully plugging
Item
No. Description No. L B D Qty Rate Unit Amount
1
Earth work excavation in ordinary soil and depositing on bank with initial lead upto 50m and lift upto 1.5m including breaking, clods, watering, ramming and sectioning of spoil bank, etc. complete. 1
4.24 0.80 0.15
0.5088 1326 10 m3 67.47
2 Construction of gully plugs using picked up stones including conveyance labour etc. 1
3.00 0.55 1.00 1.65
792.00 1 m3 1306.8
1374.27
For I m3 of Gully plugging 832.89
Unforseen items if any 67.11
IWMP-DPR,Ithikara Block Panchayat 2012
86
Total 900.00
Data Sl.no
. Description Number Rate Amount unit
1 Earthwork excavation in ordinary soil and depositing on bank with initial lead upto 50m and lift upto 1.5m including breaking, clods, watering, ramming and sectioning of spoil bank etc. complete-
Unskilled 3.35 377 1262.95 Add 5 % overhead charges 63.15 Total 1326.10 Say 1326.00 10 m3 2 Construction of gully plugs using picked up stones
including conveyance labour etc.
Picking up of available stones and conveying to the site by head load- unskilled labour 0.5
gully plugging - unskilled labour 1.5 Total 2 377 754.00 Add 5 % overhead charges 37.70 Total 791.70 Say 792.00 m3
IWMP-DPR,Ithikara Block Panchayat 2012
87
Earthern bund ( for 100 m length)
Item No. Description No. L B D Qty Rate Unit Amount
1 Clearing light jungle including uprooting of thick vegetation and small trees of girthupto 30cm and removal of rubbish upto a distance of 150 m outside the periphery of the area cleared. 1 110.00 2.10 231 188.50 100 m2 435.44
2 Earth work exaction in all classes of soil for terracing and using the spoil for forming bunds where ever required including all leads and lifts etc. complete. 1 100.00 0.50 0.75 37.5 1590 10 m3 5962.50
3 Consolidating the bund where ever required. 1 100.00 0.50 0.75 37.5 263.9 10 m3 990.00
7387.94
Unforseen items if any 12.06
Total 7400.00
For 100 m R 7400 hence for 1 m = 7400 74.00 100
IWMP-DPR,Ithikara Block Panchayat 2012
88
Data Sl.No. Description Number Rate Amount
1 Clearing light jungle including uprooting of thick vegetation and small trees of girthupto 30cm and removal of rubbish upto a distance of 150 m outside the periphery of the area cleared.
Unskillled labour 0.5 377.00 188.50 / 100 m2 2
Earth work exaction in all classes(50% ordinary soil and 50% hard so) of soil for terracing and using the spoil for forming bunds where ever required including all leads and lifts etc. complete.
For Ordinary soil (2.9625 /2) 1.4813 For hard soil (5.475 /2) 2.7375 Total Unskilled 4.2188 377.00 1590.00 / 10 m3 3 Consolidating the bund where ever required. 0.7 377.00 263.90 Say 263.90 / 10 m3
0.30
0.75
Cross Section of Bund
0.70
IWMP-DPR,Ithikara Block Panchayat 2012
89
Side protection using stone masonry
Item No Description No L B D Qty Rate Unit Amount
1 Clearing light jungle including uprooting of thick vegetation and small trees of girthupto 30cm and removal of rubbish upto a distance of 150 m outside the periphery of the area cleared. 1 100.00 0.80 80 396.00 100 m2 316.80
2 Earth work excavation in ordinary soil and depositing on bank with initial lead up to 50m and lift upto 1.5m including breaking clods, watering, ramming and sectioning of spoil bank, etc. complete.
1 100.00 0.80 0.15 12 1326.00 10 m3 1591.20 3
Earth work excavation in hard soil and depositing on bank with initial lead up to 50m and lift upto 1.5m including breaking clods, watering, ramming and sectioning of spoil bank, etc. complete.
1 100.00 0.80 0.30 24 2474.00 10 m3 5937.60 4
Dry rubble masonry including all costs of material, labour, coneyance, and all other incidental charges involved etc complete as per standard specification
Foundation 1 100.00 0.80 0.45 36 Super structure 1 100.00 0.50 0.50 25
IWMP-DPR,Ithikara Block Panchayat 2012
90
Total 61 1754.00 1 m3 106994.00 5
Random rubble masonery in cement morter 1:6 (one coat cement and six sand) using 72kg of cement /1m3 masonery for wall with hammer dressed close finished joints without pinnings and pointing the exposed faces of masonery with the same morter simultaneously during the course of construction, including cost and conveyance of all materials, labour charges etc. complete
1 100.00 0.50 0.50 25 3342.00 1 m3 83550.00 6
Plastering with cement morter 1:4, 12mm thick one coat using 54kg of cement /10m2 plastering, floated hard and trowelled smooth including cost and conveyance of all materials labour charges etc. complete
1 100.00 0.55 55 1993.00 10 10m2 10961.50 7 Back filling the available earth during the
course of construction including consoilidation, etc. complete. 1 100.00 0.50 1.00 50 974 10 m3 4870.00
214221.10 Unforeseen, if any 78.90 Grand Total 214300.00
IWMP-DPR,Ithikara Block Panchayat 2012
91
Data
Sl.no. Description Number Rate Amount 1
Clearing light jungle including uprooting of thick vegetation and small trees of girthupto 30cm and removal of rubbish upto a distance of 150 m outside the periphery of the area cleared.
Unskillled labour 1 377 377.00 Add 5 % overhead charges 18.85 Total 395.85 Say 396.00 100m2 2
Earthwork excavation in ordianary soil and depositing on bank with initial lead upto 50m and lift upto 1.5m including breaking, clods, watering, ramming and sectioning of spoil bank etc. complete-
Unskilled 3.35 377 1262.95 Add 5 % overhead charges 63.15 Total 1326.10 Say 1326.00 10m3 3
Earthwork excavation in hard soil and depositing on bank with initial lead upto 50m and lift upto 1.5m including breaking, clods, watering, ramming and sectioning of spoil bank etc. complete
Unskilled 6.25 377 2356.25 Add 5 % overhead charges 117.81 Total 2474.06 Say 2474.00 10m3 4
Dry rubble masonry including all costs of material, labour, coneyance, and all other incidental charges involved etc complete as per standard specification
IWMP-DPR,Ithikara Block Panchayat 2012
92
Rubble 1.05 420 441.00 Conveyance - Rubble 1.05 561 589.05 Labour Mason 0.8 471 376.80 Unskilled 0.7 377 263.90 1670.75 Add 5 % overhead charges 83.54 Total 1754.29 Say 1754.00 m3 5 Random rubble masonery in cement morter 1:6 (one coat cement and
six sand) using 72kg of cement /1m3 masonery for wall with hammer dressed close finished joints without pinnings and pointing the exposed faces of masonery with the same morter simultaneously during the course of construction, including cost and conveyance of all materials, labour charges etc. complete
Blasted rubble 1 420 420 Sand 0.3 2777 833 Cement 0.072 5940 428 Conveyance - Rubble 1 561 561.00 Conveyance - Sand 0.3 625 187.50 Conveyance - cement 0.072 375 27.00 rubble mason 0.7 471 330 Unskilled 0.35 377 132 Unskilled 0.7 377 264 3182.50 Add 5 % overhead charges 159.13 Total 3341.63 Say 3342.00 m3 6
Plastering with cement morter 1:4, 12mm thick one coat using 54kg of cement /10m2 plastering, floated hard and trowelled smooth including cost and conveyance of all materials labour charges etc. complete
materials Sand 0.15 2777 417.00 Cement 0.054 5940 321.00
IWMP-DPR,Ithikara Block Panchayat 2012
93
Conveyance - Sand 0.15 625 93.75 Conveyance - cement 0.054 375 20.25 labour Mason 0.9 471 424.00 Unskilled 0.55 377 207.00 Unskilled 1.1 377 415.00 1898.00 Add 5 % overhead charges 94.90 Total 1992.90 Say 1993.00 10m2 7
Back filling the available earth during the course of construction including consolidation, etc. complete.
Rate for 10m3 Conveying the available earth-Head Load 100m 10 71 710.00 Consolidating the available earth-unskilled labour 0.7 377 263.90 973.90 Say 974 10m3