AGENCY

TABLE OF CONTENTS

CONTENT PAGE Article 1: Preamble 1 Article 2: Definitions 1 Article 3: Permitting Objectives 2 Article 4: General Conditions 2 Article 5: Infrastructure and Utilities Project Parties Responsibilities 3 Article 6: Infrastructure Design Standards and References 4 Article 7: Infrastructure Elements 4 Article 8: Infrastructure and Utilities List of Permits 5 Article 9: Infrastructure and Utilities Enabling Permit 5 Article 10: Infrastructure Design Certificate 6 Article 11: Infrastructure Design Certificate Renewal 6 Article 12: Infrastructure Design Modification Permit 6 Article 13: Infrastructure Construction Permit 7 Article 14: Infrastructure Construction Permit Expiry and Renewal 7 Article 15: Infrastructure Completion Certificate 7 Article 16: Infrastructure Operation Permit 7 Article 17: Infrastructure Operation Permit Expiry and Renewal 8 Article 18: Infrastructure Fast Track Permitting 8 Article 19: Utilities Design Certificate 8 Article 20: Utilities Design Certificate Expiry and Renewal 9 Article 21: Utilities Design Modification Permit 9 Article 22: Utilities Construction Permit 9 Article 23: Utilities Construction Permit Expiry and Renewal 10 Article 24: Utilities Operation Permit 10 Article 25: Utilities Operation Permit Expiry and Renewal 10 Article 26: Utilities Fast Track Permitting 11 Article 27: Grading & Ground Leveling Works 11 Article 28: Geotechnical & Topographical Survey 11 Article 29: Authorized Design Review and Inspection Consultant Responsibilities 12 ANNEX-1: Appointment Letter and Compliance Statement Letter Forms Attd. ANNEX-2: Checklists Attd. ANNEX-3: Applications Attd. ANNEX-4: Permitting Process Flow Chart Attd. ANNEX-5: Waiver Request Attd. ANNEX-6: DRC Infrastructure Review final Approval Applications Attd.

ANNEX-1(Appointment Letter and Compliance Statement Letter Forms)

COMPANY LOGO Economic Cities Authority Municipalities Department ECA Building, Juman Street 87 – Building 1 Bay La Sun, King Abdullah Economic City 23964 Kingdom of Saudi Arabia Re: Appointment of Prequalified Consultants and Contractors Name of Economic City: __________________________________________________ Name of Project: ________________________________________________________ Dear Sir, Please be informed that the below pre-qualified consultants and contractors are the subject project parties

# Project team Company Name Project Manager Mobile & Email

1 Engineering Design Consultant

2 Design Review Consultant

3 Environmental Assessment Consultant

4 Main Contractor

8 Others ? please specify

Sincerely yours, __________________ Name of the Representative Title of the Representative (Project Manager and above)

Consultant Name & Logo

Date: xx-xx-xxx

Name of Economic City, Kingdom of Saudi Arabia

Developer/Investor:

Project Name:

Contract Reference:

Design Consultant Statement of Project Compliance

Per the request of the Developer, the Design Consultant acknowledges the following statements in accordance with their Design Consultant Agreement for the project:

1. The Design Consultant (Name) confirms, based on available data and information, and based upon our diligence that all design, engineering, traffic, safety and environmental studies are in compliance with the applicable and required regulations, building codes, approved planning and design guidelines, and good industry practice necessary for construction and future operation of the project.

2. The Design Consultant confirms that it has taken and will continue to take all required steps, in accordance with our agreement, to ensure that the property is designed in accordance with applicable and required regulations, approved guidelines, building codes and good industry practice. Therefore, the Design Consultant confirms that the property has met all conditions required to be served by sewage, drainage, water supply and electricity services and that the existing works for these services are in compliance with the requirements of the approved construction documents.

3. The Design Consultant confirms that the project design documents that have been prepared are based on good industry practices, and that the project is ready to be constructed in a manner that is fit for its intended use.

4. The Design Consultant confirms that all outstanding design issues have been resolved, and that the design documents have satisfied all requirements stated above.

5. The Design Consultant confirms that all above statements are correct and non misleading to the best of its knowledge. In the event of any fraud, misrepresentation, negligence, recklessness, or willful misconduct in relation to the above statements, the Design Consultant shall be held liable for any damages resulting therefrom.

Signature & Stamp For and on behalf of

The Consultant

By: Eng. - - - - - - - - - - - - --

Head of Design Department

Consultant Name & Logo

Date: xx-xx-xxx

Name of Economic City, Kingdom of Saudi Arabia

Developer/Investor:

Project Name:

Contract Reference:

Design Review Consultant Statement of Project Compliance

Per the request of the Developer, the Design Consultant acknowledges the following statements in accordance with their Consultancy Services Agreement for the project:

1. The Design Review Consultant (Name) confirms, based on available data and information, and based upon our diligence that all design, engineering, traffic, safety and environmental studies are in compliance with the applicable and required regulations, building codes, approved planning and design guidelines, and good industry practice necessary for construction and future operation of the project.

2. The Design Review Consultant confirms that it has taken and will continue to take all required steps, in accordance with our agreement, to ensure that the documents are designed in accordance with applicable and required regulations, approved guidelines, building codes and good industry practice. Therefore, the Design Review Consultant confirms that the documents meet all requirements for sewage, drainage, water supply and electricity services and that the proposed works for these services will be in compliance with the requirements of the approved construction documents.

3. The Design Review Consultant confirms that the project design documents that have been prepared are based on good industry practices, and that the project is ready to be constructed in a manner that is fit for its intended use.

4. The Design Review Consultant confirms that all outstanding design issues have been resolved, and that the design documents have satisfied all requirements stated above.

5. The Design Review Consultant confirms that all above statements are correct and not misleading to the best of its knowledge. In the event of any fraud, misrepresentation, negligence, recklessness, or willful misconduct in relation to the above statements, the Design Review Consultant shall be held liable for any damages resulting there from.

Signature & Stamp For and on behalf of

The Consultant

By: Eng. - - - - - - - - - - - - --

Head of Design Department

Consultant Name & Logo

Date: xx-xx-xxx

Name of Economic City, Kingdom of Saudi Arabia

Developer/Investor:

Project Name:

Contract Reference:

Construction Contractor Statement of Project Compliance

The Contractor acknowledges the following statements in accordance with ECA requirements:

1. The Contractor (Name) confirms, based on available data and information, and based upon our diligence that all design and existing works executed up-to-date are in compliance with the contract documents and the approved designs and drawings.

2. The Contractor confirms that the property has been constructed with the required connection for sewage, drainage, water supply and electricity services and that the existing works for these services are in compliance with the contract documents and the approved designs and drawings .

3. The Contractor confirms that all major works impacting the overall safety, quality, and integrity of the project have been completed therefore eliminating any major potential risks to the project.

Signature & Stamp

Consultant Name & Logo

Date: xx-xx-xxx

Name of Economic City, Kingdom of Saudi Arabia

Developer/Investor:

Project Name:

Contract Reference:

Supervision Consultant Statement of Project Compliance

Per the request of the Developer, the Supervision Consultant acknowledges the following statements in accordance with their Supervision Consultant Agreement for the project:

1. The Supervision Consultant (Name) confirms, based on available data and information, and based upon our diligence that all design and existing works to date are in compliance with the applicable and required regulations, building codes, approved planning and design guidelines, and good industry practice necessary for construction and future operation of the project.

2. The Supervision Consultant confirms that it has taken and will continue to take all required steps, in accordance with our agreement, to ensure that the property is designed in accordance with applicable and required regulations, approved guidelines, building codes and good industry practice. Therefore, the Supervision Consultant confirms that the property has met all conditions required to be served by sewage, drainage, water supply and electricity services and that the existing works for these services are in compliance with the requirements of the approved construction documents.

3. The Supervision Consultant confirms that the project design documents that have been prepared by the designer (Name) are based on good industry practices, and that the project was designed and constructed in a manner that is fit for its intended use.

4. The Supervision Consultant confirms that all existing works related to the project have been completed in accordance with the project Specifications and good industry practice. Any non conformance issues related to the quality of construction will be resolved, and the Supervision Consultant (Name) confirms that these issues do not present a major risk affecting the overall safety, quality and integrity of the project.

Signature & Stamp For and on behalf of

The Consultant

By: Eng. - - - - - - - - - - - - --

Head of Construction Supervision Projects

ANNEX-2(Checklists)

Bay La Sun - 7082 Unit (2) King Abdullah Economic

City - 2396 - 2522 Kingdom of Saudi Arabia

Tel: +966 12 610 6700 - Fax: +966 12 610 6767

e-Mail : [email protected]

www.eca.gov.sa

Economic Cities Authority

Real Estate & Municipality Affairs

Municipalities Department

Enabling Permit Checklist

Project Name

# Item Format Attchd ECA Permitting Manger Check Comments

1 Enabling Permit Application Hard/Soft Copy ☐ ☐

2 Local Area Plan Approval Hard/Soft Copy ☐ ☐

3 Plots ID’s PDF Copy ☐ ☐

4 Appointment Letter Hard/Soft Copy ☐ ☐

5 Design Consultant Pre-Qualification Certificate Hard/Soft Copy ☐ ☐

6 Developed Area Master Croqui PDF Copy ☐ ☐

7 Hydrological Study of The Developed Area (Stamped by Authorized Design Review Consultant) PDF Copy ☐ ☐

8 Conceptual Design Drawings CAD/PDF Copy ☐ ☐

9 Project execution plan (including HSE, QA/QC, Waste Management, Site mobilization Plan Hard/Soft Copy ☐ ☐

10 Waste Disposal Contract with approved contractor and approved disposal facility Hard/Soft Copy ☐ ☐

11 MOM of Workshop with ECA Hard/Soft Copy ☐ ☐

12 Temporary to Permanent Utilities Resources Phasing Plan Hard/Soft Copy ☐ ☐ If Applicable

Bay La Sun - 7082 Unit (2) King Abdullah Economic

City - 2396 - 2522 Kingdom of Saudi Arabia

Tel: +966 12 610 6700 - Fax: +966 12 610 6767

e-Mail : [email protected]

www.eca.gov.sa

Economic Cities Authority

Real Estate & Municipality Affairs

Municipalities Department

Infrastructure Design Certificate Checklist

Project Name

# Item Format Attchd ECA Permitting Manger Check Comments

1 Infrastructure Design Certificate Application Hard/Soft Copy ☐ ☐

2 Local Area Plan Approval Hard/Soft Copy ☐ ☐

3 Plots ID’s PDF Copy ☐ ☐

4 Appointment Letter Hard/Soft Copy ☐ ☐

5 Design Consultant Contract Hard/Soft Copy ☐ ☐

6 Design Consultant Compliance Statement Letter (Original Copy) Hard/Soft Copy ☐ ☐

7 DRC Infrastructure Review final Approval Applications (Original Copy) Hard/Soft Copy ☐ ☐

8 DRC Compliance Statement Letter (Original Copy) Hard/Soft Copy ☐ ☐

9 Developed Area Master Croqui PDF Copy ☐ ☐

10 Hydrological Study of The Developed Area (Stamped by Authorized Design Review Consultant) PDF Copy ☐ ☐

11 General Layout shows Point of Connections to the Primary

11.1 Sewerage network PDF Copy ☐ ☐

11.2 Storm-water Drainage Network PDF Copy ☐ ☐

11.3 Potable water PDF Copy ☐ ☐

11.4 Firefighting water PDF Copy ☐ ☐

11.5 Irrigation network PDF Copy ☐ ☐

11.6 District cooling water PDF Copy ☐ ☐ If Applicable

11.7 Industrial Process water PDF Copy ☐ ☐ If Applicable

11.8 HV/MV/LV Power System PDF Copy ☐ ☐ 11.9 Street lighting System PDF Copy ☐ ☐

11.10 HP/IP/LP Gas Supply System PDF Copy ☐ ☐ If Applicable

11.11 Telecommunication System PDF Copy ☐ ☐

11.12 Transportation Network (Internal Roads) PDF Copy ☐ ☐

12 Utilities Corridor Section PDF Copy ☐ ☐

13 Detailed Drawings of all Infra. Networks CAD ☐ ☐

14 Temporary to Permanent Utilities Resources Phasing Plan Hard/Soft Copy ☐ ☐ If Applicable

15 Fees Calculation Sheet stamped by DRC Hard/Soft Copy ☐ ☐

Bay La Sun - 7082 Unit (2) King Abdullah Economic

City - 2396 - 2522 Kingdom of Saudi Arabia

Tel: +966 12 610 6700 - Fax: +966 12 610 6767

e-Mail : [email protected]

www.eca.gov.sa

Economic Cities Authority

Real Estate & Municipality Affairs

Municipalities Department

Infrastructure Construction Permit Checklist Project Name

# Item Format Attchd ECA Permitting Manger

Check Comments 1 Infrastructure Construction Permit Application Hard/Soft Copy ☐ ☐

2 Valid Infrastructure Design Certificate Hard/Soft Copy ☐ ☐

3 Appointment Letter Hard/Soft Copy ☐ ☐

4 Project Supervision Consultant Contract Hard/Soft Copy ☐ ☐

5 Main Contractor Contract Soft Copy ☐ ☐

6 Project Milestones plan Hard/Soft Copy ☐ ☐

7 Project execution plan (including HSE, QA/QC, Waste Management, Site mobilization Plan Hard/Soft Copy ☐ ☐

8 Construction/All Risk insurance certificate Soft Copy ☐ ☐

9 Waste Disposal Contract with approved contractor and approved disposal facility Hard/Soft Copy ☐ ☐

10 Excavate-to-Locate Report Soft Copy ☐ ☐ If Applicable

11 Fees Calculation Sheet Hard/Soft Copy ☐ ☐

Bay La Sun - 7082 Unit (2) King Abdullah Economic

City - 2396 - 2522 Kingdom of Saudi Arabia

Tel: +966 12 610 6700 - Fax: +966 12 610 6767

e-Mail : [email protected]

www.eca.gov.sa

Economic Cities Authority

Real Estate & Municipality Affairs

Municipalities Department

Infrastructure Completion Certificate Checklist Project Name

# Item Format Attchd ECA Permitting Manger Check Comments

1 Infrastructure Completion Certificate Application Hard/Soft Copy ☐ ☐

2 Infrastructure Construction Permit Hard/Soft Copy ☐ ☐

3 Supervision Consultant Compliance Statement letter (original copy) Hard/Soft Copy ☐ ☐

4 Design Consultant Compliance Statement Letter (original copy) Hard/Soft Copy ☐ ☐

5 Construction Contractor Statement Compliance Letter (original copy) Hard/Soft Copy ☐ ☐

6 Take Over Certificates Hard/Soft Copy ☐ ☐

7 Project Supervision Consultant Snag List Closing Report Hard/Soft Copy ☐ ☐

8 Applicable Test Reports

8.1 Meggering (power cable) Soft Copy ☐ ☐

8.2 Continuity (Telecom. Cable). Soft Copy ☐ ☐

8.3 Hydraulic/Pneumatic (Fluid Lines). Soft Copy ☐ ☐

8.4 Bacterial Test (Potable Water). Soft Copy ☐ ☐

8.5 Firefighting testing and commissioning (form Authorized consultant and MD’s fire and safety Dept.) Soft Copy ☐ ☐

8.6 Storm-Water/Rain Drainage Site Test. Soft Copy ☐ ☐

8.7 Earthwork, Soil and Asphalt Soft Copy ☐ ☐

9 Main Equipment Warranties Soft Copy ☐ ☐

10 As-Built Drawings Soft Copy ☐ ☐ If Applicable

11 ECA Site Inspection Report Comments Closing Hard/Soft Copy ☐ ☐

12 DRC Site Inspection Report Comments Closing Hard/Soft Copy ☐ ☐

13 Plots Croquies (Original Copy Issued By Authorized Surveyor) Hard/Soft Copy ☐ ☐

14 Fees Calculation Sheet Hard/Soft Copy ☐ ☐

Bay La Sun - 7082 Unit (2) King Abdullah Economic

City - 2396 - 2522 Kingdom of Saudi Arabia

Tel: +966 12 610 6700 - Fax: +966 12 610 6767

e-Mail : [email protected]

www.eca.gov.sa

Economic Cities Authority

Real Estate & Municipality Affairs

Municipalities Department

Infrastructure Operation Permit Checklist ☐ New ☐ Renewal

Project Name Economic City Districts Neighborhood Block Number Local Community Block Area m2

# Item Format Attchd ECA Permitting Manger

Check Comments 1 Infrastructure Operation Permit Application Hard/Soft Copy ☐ ☐

2 Infrastructure Completion Certificate Hard/Soft Copy ☐ ☐

3 Appointment letter Hard/Soft Copy ☐ ☐

4 Firefighting Network testing and commissioning confirmation by the Concerned Dept. /Party. Hard/Soft Copy ☐ ☐

5 Connection to primary infrastructure confirmation from Concerned Dept. Hard/Soft Copy ☐ ☐

6 Qualified O&M Contractor Contract Soft Copy ☐ ☐

7 O&M Contract

8 Operation & Maintenance Manuals

8.1 O&M for Water Network Soft Copy ☐ ☐

8.2 O&M for Storm-water Network Soft Copy ☐ ☐

8.3 O&M for Sewerage Network Soft Copy ☐ ☐

8.4 O&M for Irrigation Network Soft Copy ☐ ☐

8.5 O&M for Electrical Power Network Soft Copy ☐ ☐

8.6 O&M for Transportation Network (Asphalted Roads) Soft Copy ☐ ☐

9 Operation Risk Insurance Certificate Soft Copy ☐ ☐

10 ECA final Inspection closing report Hard/Soft Copy ☐ ☐

11 Fees Calculation Sheet Hard/Soft Copy ☐ ☐

Bay La Sun - 7082 Unit (2) King Abdullah Economic

City - 2396 - 2522 Kingdom of Saudi Arabia

Tel: +966 12 610 6700 - Fax: +966 12 610 6767

e-Mail : [email protected]

www.eca.gov.sa

Economic Cities Authority

Real Estate & Municipality Affairs

Municipalities Department

Infrastructure Construction Permit – Fast Track Permitting

Project Name

# Item Format Attchd ECA Permitting Manger Check Comments

1 Infrastructure Fast Track Permitting Application Hard/Soft Copy ☐ ☐

2 Local Area Plan Approval Hard/Soft Copy ☐ ☐

3 Plots ID’s PDF Copy ☐ ☐

4 Appointment Letter Hard/Soft Copy ☐ ☐

5 Design Consultant Contract Hard/Soft Copy ☐ ☐

6 Design Consultant Compliance Statement Letter (Original Copy) Hard/Soft Copy ☐ ☐

7 DRC Infrastructure Review final Approval Applications (Original Copy) Hard/Soft Copy ☐ ☐

8 DRC Compliance Statement Letter (Original Copy) Hard/Soft Copy ☐ ☐

9 Developed Area Master Croqui PDF Copy ☐ ☐

10 Hydrological Study of The Developed Area (Stamped by Authorized Design Review Consultant) PDF Copy ☐ ☐

11 General Layout shows Point of Connections to the Primary

11.1 Sewerage network PDF Copy ☐ ☐

11.2 Storm-water Drainage Network PDF Copy ☐ ☐

11.3 Potable water PDF Copy ☐ ☐

11.4 Firefighting water PDF Copy ☐ ☐

11.5 Irrigation network PDF Copy ☐ ☐

11.6 District cooling water PDF Copy ☐ ☐ If Applicable

11.7 Industrial Process water PDF Copy ☐ ☐ If Applicable

11.8 HV/MV/LV Power System PDF Copy ☐ ☐ 11.9 Street lighting System PDF Copy ☐ ☐

11.10 HP/IP/LP Gas Supply System PDF Copy ☐ ☐ If Applicable

11.11 Telecommunication System PDF Copy ☐ ☐

11.12 Transportation Network (Internal Roads) PDF Copy ☐ ☐

12 Utilities Corridor Section PDF Copy ☐ ☐

13 Detailed Drawings of all Infra. Networks CAD ☐ ☐

14 Temporary to Permanent Utilities Resources Phasing Plan Hard/Soft Copy ☐ ☐ If Applicable

15 Project Supervision Consultant Contract Hard/Soft Copy ☐ ☐

16 Main Contractor Contract Soft Copy ☐ ☐

17 Project Milestones plan Hard/Soft Copy ☐ ☐

18 Project execution plan (including HSE, QA/QC, Waste Management, Site mobilization Plan Hard/Soft Copy ☐ ☐

19 Construction/All Risk insurance certificate Soft Copy ☐ ☐

20 MOM of Workshop with ECA Team Hard/Soft Copy ☐ ☐

21 Waste Disposal Contract with approved contractor and approved disposal facility Hard/Soft Copy ☐ ☐

22 Fees Calculation Sheet stamped by DRC Hard/Soft Copy ☐ ☐

Bay La Sun - 7082 Unit (2) King Abdullah Economic

City - 2396 - 2522 Kingdom of Saudi Arabia

Tel: +966 12 610 6700 - Fax: +966 12 610 6767

e-Mail : [email protected]

www.eca.gov.sa

Economic Cities Authority

Real Estate & Municipality Affairs

Municipalities Department

Utilities Design Certificate Checklist Project Name

# Item Format Attchd ECA Permitting Manger

Check Comments 1 Utilities Design Certificate Application Hard/Soft Copy ☐ ☐

2 Urban Planning Approval Hard/Soft Copy ☐ ☐

3 Appointment Letter Hard/Soft Copy ☐ ☐

4 Environmental Consultant Contract Hard/Soft Copy ☐ ☐

5 Design Consultant Contract Hard/Soft Copy ☐ ☐

6 Design Consultant Compliance Statement Letter (Original Copy) Hard/Soft Copy ☐ ☐

7 DRC Compliance Statement Letter (Original Copy) Hard/Soft Copy ☐ ☐

8 Environmental Impact Assessment Report PDF Copy ☐ ☐

9 Temporary to Permanent Phasing Plan PDF Copy ☐ ☐ If Applicable

10 Engineering Detailed Design PDF Copy ☐ ☐

11 List of Communities to be supplied (General Layout drawing connection to Primary) PDF Copy ☐ ☐

12 Fees Calculation Sheet Hard/Soft Copy ☐ ☐

Bay La Sun - 7082 Unit (2) King Abdullah Economic

City - 2396 - 2522 Kingdom of Saudi Arabia

Tel: +966 12 610 6700 - Fax: +966 12 610 6767

e-Mail : [email protected]

www.eca.gov.sa

Economic Cities Authority

Real Estate & Municipality Affairs

Municipalities Department

Utilities Construction Permit Checklist Project Name

# Item Format Attchd ECA Permitting Manger

Check Comments 1 Utilities Construction Permit Application Hard/Soft Copy ☐ ☐

2 Valid Utilities Design Certificate Hard/Soft Copy ☐ ☐

3 Appointment Letter Hard/Soft Copy ☐ ☐

4 Project Supervision Consultant Contract Hard/Soft Copy ☐ ☐

5 Main Contractor Contract PDF Copy ☐ ☐

6 Project execution plan (including HSE, QA/QC, Waste Management, Site mobilization Plan PDF Copy ☐ ☐

7 Waste Disposal Contract with approved contractor and approved disposal facility Hard/Soft Copy ☐ ☐

8 All Risk insurance certificate PDF Copy ☐ ☐

9 Fees Calculation Sheet Hard/Soft Copy ☐ ☐

Bay La Sun - 7082 Unit (2) King Abdullah Economic

City - 2396 - 2522 Kingdom of Saudi Arabia

Tel: +966 12 610 6700 - Fax: +966 12 610 6767

e-Mail : [email protected]

www.eca.gov.sa

Economic Cities Authority

Real Estate & Municipality Affairs

Municipalities Department

Utilities Operation Permit Checklist Project Name

# Item Format Attchd ECA Permitting Manger

Check Comments 1 Utilities Operation Permit Application Hard/Soft Copy ☐ ☐

2 Utilities Construction Permit Hard/Soft Copy ☐ ☐

3 Appointment Letter Hard/Soft Copy ☐ ☐

4 O&M Contractor Contract Hard/Soft Copy ☐ ☐

5 O&M Contract

6 Operation & Maintenance Manuals PDF Copy ☐ ☐

7 HSE Risk Assessment and HSE Management Manual PDF Copy ☐ ☐

8 Emergency Response Plan PDF Copy ☐ ☐

9 Firefighting System Commission Certificate (form authorized consultant and MD’s fire and safety Dept.) PDF Copy ☐ ☐

10 PME Environmental Construction Certificate PDF Copy ☐ ☐

11 Work Order/Contract for Environmental Evaluation Report PDF Copy ☐ ☐ Permit renewal requires the Env. Evaluation Report

12 Hazardous Waste Disposal Contract with PME Approved Disposal Facility PDF Copy ☐ ☐

13 Drinking Water Quality Monitoring Program PDF Copy ☐ ☐

14 ECA Site Inspection Reports Comments Closing Hard/Soft Copy ☐ ☐

15 DRC Site Inspection Reports Comments Closing Hard/Soft Copy ☐ ☐

16 Operation Risk Insurance PDF Copy ☐ ☐

17 List of Communities to be supplied (General Layout drawing connection to Primary) PDF Copy ☐ ☐

18 Take Over Certificate (Hand Over Certificate) Hard/Soft Copy ☐ ☐

19 Testing and Commissioning of equipment’s Hard/Soft Copy ☐ ☐

20 Fees Calculation Sheet Hard/Soft Copy ☐ ☐

Bay La Sun - 7082 Unit (2) King Abdullah Economic

City - 2396 - 2522 Kingdom of Saudi Arabia

Tel: +966 12 610 6700 - Fax: +966 12 610 6767

e-Mail : [email protected]

www.eca.gov.sa

Economic Cities Authority

Real Estate & Municipality Affairs

Municipalities Department

Utilities Construction Permit- Fast Track Permitting Checklist Project Name

# Item Format Attchd ECA Permitting Manger

Check Comments 1 Utilities Fast Track Permitting Application Hard/Soft Copy ☐ ☐

2 Urban Planning Approval Hard/Soft Copy ☐ ☐

3 Appointment Letter Hard/Soft Copy ☐ ☐

4 Environmental Consultant Contract Hard/Soft Copy ☐ ☐

5 Design Consultant Contract Hard/Soft Copy ☐ ☐

6 Design Consultant Compliance Statement Letter (Original Copy) Hard/Soft Copy ☐ ☐

7 DRC Compliance Statement Letter (Original Copy) Hard/Soft Copy ☐ ☐

8 Environmental Impact Assessment Report PDF Copy ☐ ☐

9 Temporary to Permanent Phasing Plan PDF Copy ☐ ☐ If Applicable

10 Engineering Detailed Design PDF Copy ☐ ☐

11 List of Communities to be supplied (General Layout drawing connection to Primary) PDF Copy ☐ ☐

12 Project Supervision Consultant Contract Hard/Soft Copy ☐ ☐

13 Main Contractor Contract PDF Copy ☐ ☐

14 Project execution plan (including HSE, QA/QC, Waste Management, Site mobilization Plan PDF Copy ☐ ☐

15 Waste Disposal Contract with approved contractor and approved disposal facility Hard/Soft Copy ☐ ☐

16 All Risk insurance certificate PDF Copy ☐ ☐

17 Fees Calculation Sheet Hard/Soft Copy ☐ ☐

ANNEX-3(Applications)

Bay La Sun - 7082 Unit (2) King Abdullah Economic

City - 2396 - 2522 Kingdom of Saudi Arabia

Tel: +966 12 610 6700 - Fax: +966 12 610 6767

e-Mail : [email protected]

www.eca.gov.sa

Economic Cities Authority

Real Estate & Municipal Affairs

Municipalities Department

Enabling Permits Application Project Information Project Name Project Type Developer/ Sub Developer Land Use ☐ Infrastructure Investment License Project Cost ☐ Utilities Economic City Plot Number District Plot Area Project Team Information Developer/ Sub Developer Project Manager Contractor Project Manager Supervision Project Manager Name Name Name Mobile No Mobile No Mobile No Email Email Email

Design Consultant Information Name & Contact Info Stamp & Signature Design Consultant Declaration

I hereby affirm that I possess a full force and effective license under related KSA Law, and herby that all design, engineering, traffic, safety and environmental studies are in compliance with the applicable and required regulations, building codes, approved planning and design guidelines, and good industry practice necessary for construction and future operation of the project. Also, I hereby undertake to apply for a license under provision of ECA if, I’m not already licensed under such provision.

Supervision Consultant Information Name & Contact Info Stamp & Signature Supervision Consultant Declaration

I hereby confirm that I possess a valid license under related KSA Law, ECA regulations and rules, and herby that all design, engineering, traffic, safety and environmental studies are in compliance with the applicable and required regulations, building codes, approved planning and design guidelines, and good industry practice necessary for construction and future operation of the project. In addition, I hereby undertake to apply for any additional license may ECA require.

Contractor Information Name & Contact Info Stamp & Signature Licensed Contractor Declaration

I hereby affirm that I possess a full force and effective license under related KSA law, and herby undertake to apply for a license under provision of ECA if, I’m not already licensed under such provision.

Insurance Company Policy No Expiry Date Contractor Insurance Declaration

I hereby affirm that I have a certificate of consent for Buildings’ Equipment, Workers Compensation and Indemnity Insurance, and a certified copy thereof filed with the ECA.

Applicant Information

ECA Official Approval Name & Contact Info City Stamp & Signature Approved ☐ Revise & Resubmit ☐ Occupation

Address Applicant Undertaking Declaration

I certify that I have read the application and declare that the above information is correct and that I am the owner or the duly authorized agent of the owner. I agree to comply with all laws relating to building construction. I hereby authorize representatives of ECA to enter the above-property for inspection and monitoring purposes.

Permitting Manager

Bay La Sun - 7082 Unit (2) King Abdullah Economic

City - 2396 - 2522 Kingdom of Saudi Arabia

Tel: +966 12 610 6700 - Fax: +966 12 610 6767

e-Mail : [email protected]

www.eca.gov.sa

Economic Cities Authority

Real Estate & Municipal Affairs

Municipalities Department

Infrastructure Design Certificate Application Project Information

Project Name Economic City Developer/Sub-developer District

Network Type Block Number ☐ Secondary Roads ☐ Firefighting Block Area (m2) ☐ HV ☐ Storm-water Drainage Number of Units ☐ MV/LV ☐ Irrigation Power Demand (MVA) ☐ Telecommunication ☐ Street Lighting Potable Water Demand (L/day) ☐ Potable Water ☐ Gas Waste-water Demands (L/s) ☐ Waste-water ☐ Landscape Planed Construction Start Date ☐ Primary Road & Storm Water Protection Planed Construction Finish Date

Design Consultant Information

Project Team Details

Name Stamp Developer/ Sub-developer

Engineering License Number

Name

Mobile No

I hereby confirm that I possess a valid license under related KSA Law, ECA regulations and rules, and herby that all design, engineering, traffic, safety and environmental studies are in compliance with the applicable and required regulations, building codes, approved planning and design guidelines, and good industry practice necessary for construction and future operation of the project. In addition, I hereby undertake to apply for any additional license may ECA require.

Email

Design Consultant Information

Name

Mobile No

Office Manager’s / Representative's Signature & Stamp: Email

Authorized Design Review Consultant Authorized Design Review Consultant

Name & Contact Info Stamp Name

I hereby confirm that I possess a valid license under related KSA Law, ECA regulations and rules, and herby that all design, engineering, traffic, safety and environmental studies are in compliance with the applicable and required regulations, building codes, approved planning and design guidelines, and good industry practice necessary for construction and future operation of the project. In addition, I hereby undertake to apply for any additional license may ECA require.

Mobile No

Email

ECA Official Approval

Office Manager’s / Representative's Signature & Stamp: Approved ☐ Rejected ☐

Applicant Information

Date:

Name & Contact Info Stamp Permitting Manager

Applicant Declaration

`

I certify that I have read the application and declare that the above information is correct and that I am the owner or the duly authorized agent of the owner. I agree to comply with all KSA laws, ECA regulations and rules relating to building construction. I hereby authorize representatives of ECA to enter the above-property for inspection and monitoring purposes.

Owner / Representative's Signature & Stamp:

Bay La Sun - 7082 Unit (2) King Abdullah Economic

City - 2396 - 2522 Kingdom of Saudi Arabia

Tel: +966 12 610 6700 - Fax: +966 12 610 6767

e-Mail : [email protected]

www.eca.gov.sa

Economic Cities Authority

Real Estate & Municipal Affairs

Municipalities Department

Infrastructure Design Certificate Renewal Application Expired Infrastructure Design Certificate Information

Permit Number Print Date Project Revised Plan

Revised Construction Start Date Revised Construction Completion Date Applicant Information

Project Team Details

Name & Contact Info Stamp

Design Consultant Information

Applicant Declaration

Name

I certify that I have read the application and declare that the above information is correct and that I am the owner or the duly authorized agent of the owner. I agree to comply with all laws relating to building construction. I hereby authorize representatives of ECA to enter the above-property for inspection and monitoring purposes. Owner / Representative's Signature & Stamp:

Mobile No

Email

Authorized Design Review Consultant Information

Name

Mobile No

Email

ECA Official Approval

Approved ☐ Rejected ☐

Date:

Permitting Manager

`

Bay La Sun - 7082 Unit (2) King Abdullah Economic

City - 2396 - 2522 Kingdom of Saudi Arabia

Tel: +966 12 610 6700 - Fax: +966 12 610 6767

e-Mail : [email protected]

www.eca.gov.sa

Economic Cities Authority

Real Estate & Municipal Affairs

Municipalities Department

Infrastructure Design Modification Permit Application Please, Fill Only the Information of the Latest Issued Permit/Certificate Design Certificate Information

Number Print Date Construction Permit Information

Number Print Date Operation Permit Information

Number

Print Date

Modified Designed Network ☐ Secondary Roads ☐ Telecommunication ☐ Firefighting ☐ Street Lighting

☐ HV ☐ Potable water ☐ Storm-water Drainage ☐ Gas

☐ MV/LV ☐ Waste-water ☐ Irrigation ☐ Landscape

Design Consultant Information

Project Team Details

Name Stamp Design Consultant Information

Engineering License Number

Name Mobile No

I hereby confirm that I possess a valid license under related KSA Law, ECA regulations and rules, and herby that all design, engineering, traffic, safety and environmental studies are in compliance with the applicable and required regulations, building codes, approved planning and design guidelines, and good industry practice necessary for construction and future operation of the project. In addition, I hereby undertake to apply for any additional license may ECA require.

Email

Authorized Design Review Consultant

Name

Mobile No

Office Manager’s / Representative's Signature & Stamp: Email

Authorized Design Review Consultant

Name & Contact Info Stamp I hereby confirm that I possess a valid license under related KSA Law, ECA regulations and rules, and herby that all design, engineering, traffic, safety and environmental studies are in compliance with the applicable and required regulations, building codes, approved planning and design guidelines, and good industry practice necessary for construction and future operation of the project. In addition, I hereby undertake to apply for any additional license may ECA require.

ECA Official Approval

Office Manager’s / Representative's Signature & Stamp: Approved ☐ Rejected ☐

Applicant Information

Date:

Name & Contact Info Stamp Permitting Manager

Applicant Declaration

`

I certify that I have read the application and declare that the above information is correct and that I am the owner or the duly authorized agent of the owner. I agree to comply with all KSA laws, ECA regulation and rules relating to building construction. I hereby authorize representatives of ECA to enter the above-property for inspection and monitoring purposes

Owner / Representative's Signature & Stamp:

Bay La Sun - 7082 Unit (2) King Abdullah Economic

City - 2396 - 2522 Kingdom of Saudi Arabia

Tel: +966 12 610 6700 - Fax: +966 12 610 6767

e-Mail : [email protected]

www.eca.gov.sa

Economic Cities Authority

Real Estate & Municipal Affairs

Municipalities Department

Infrastructure Construction Permit Application Project Information

Project Name

Valid Design Certificate Number

Economic City

District Planed Construction Start Date Planed Construction Finish Date Project Cost (SAR)

Supervision Consultant

Project Team Details

Name &Contact Info Stamp Developer/ Sub-developer

Engineering License No

Name

I hereby confirm that I possess a valid license under related KSA Law, ECA regulations and rules, and herby that all design, engineering, traffic, safety and environmental studies are in compliance with the applicable and required regulations, building codes, approved planning and design guidelines, and good industry practice necessary for construction and future operation of the project. In addition, I hereby undertake to apply for any additional license may ECA require.

Mobile No

Email

Construction Contractor Manager

Name

Mobile No

Office Manager’s / Representative's Signature & Stamp: Email

Construction Contractor Supervision Consultant Project Manager

Name &Contact Info Stamp Name

Commercial Registration No.

Mobile No I hereby confirm that I possess a valid license under related KSA Law, ECA regulations and rules, and herby that all design, engineering, traffic, safety and environmental studies are in compliance with the applicable and required regulations, building codes, approved planning and design guidelines, and good industry practice necessary for construction and future operation of the project. In addition, I hereby undertake to apply for any additional license may ECA require.

Email

Insurance Company

Insurance Company Name Stamp Policy No.

ECA Official Approval Expiry Date

Office Manager’s / Representative's Signature & Stamp: Approved ☐ Rejected ☐

Applicant Information

Date:

Name &Contact Info Stamp Permitting Manager

Applicant Declaration

I certify that I have read the application and declare that the above information is correct and that I am the owner or the duly authorized agent of the owner. I agree to comply with all KSA laws, ECA regulation and rules relating to building construction. I hereby authorize representatives of ECA to enter the above-property for inspection and monitoring purposes.

Owner / Representative's Signature & Stamp:

Bay La Sun - 7082 Unit (2) King Abdullah Economic

City - 2396 - 2522 Kingdom of Saudi Arabia

Tel: +966 12 610 6700 - Fax: +966 12 610 6767

e-Mail : [email protected]

www.eca.gov.sa

Economic Cities Authority

Real Estate & Municipal Affairs

Municipalities Department

Infrastructure Construction Permit Renewal Application Expired Infrastructure Construction Permit Information

Permit Number

Print Date

Project Revised Plan

Revised Construction Finish Date

Supervision Consultant

Project Team Details

Name &Contact Info Stamp Developer/ Sub-developer

Engineering License No

Name

I hereby confirm that I possess a valid license under related KSA Law, ECA regulations and rules, and herby that all design, engineering, traffic, safety and environmental studies are in compliance with the applicable and required regulations, building codes, approved planning and design guidelines, and good industry practice necessary for construction and future operation of the project. In addition, I hereby undertake to apply for any additional license may ECA require.

Mobile No

Email

Construction Contractor Manager

Name

Mobile No

Office Manager’s / Representative's Signature & Stamp: Email

Construction Contractor Supervision Consultant Project Manager

Name &Contact Info Stamp Name

Commercial Registration No.

Mobile No I hereby confirm that I possess a valid license under related KSA Law, ECA regulations and rules, and herby that all design, engineering, traffic, safety and environmental studies are in compliance with the applicable and required regulations, building codes, approved planning and design guidelines, and good industry practice necessary for construction and future operation of the project. In addition, I hereby undertake to apply for any additional license may ECA require.

Email

Insurance Company

Insurance Company Name Stamp Policy No.

ECA Official Approval Expiry Date

Office Manager’s / Representative's Signature & Stamp: Approved ☐ Rejected ☐

Applicant Information

Date:

Name &Contact Info Stamp Permitting Manager

Applicant Declaration

I certify that I have read the application and declare that the above information is correct and that I am the owner or the duly authorized agent of the owner. I agree to comply with all KSA laws, ECA regulation and rules relating to building construction. I hereby authorize representatives of ECA to enter the above-property for inspection and monitoring purposes.

Owner / Representative's Signature & Stamp:

Bay La Sun - 7082 Unit (2) King Abdullah Economic

City - 2396 - 2522 Kingdom of Saudi Arabia

Tel: +966 12 610 6700 - Fax: +966 12 610 6767

e-Mail : [email protected]

www.eca.gov.sa

Economic Cities Authority

Real Estate & Municipal Affairs

Municipalities Department

Infrastructure Completion Certificate Application Project Information

Project Name City

Developer/Sub-developer District

Completed and Tested Network Block Number ☐ Secondary Roads ☐ Firefighting Developed Area (m2) ☐ HV ☐ Storm-water Drainage Power Capacity (MVA) ☐ MV/LV ☐ Irrigation Potable Water Capacity (L/day) ☐ Telecommunication ☐ Street Lighting Waste-water Capacity (L/s)

☐ Potable Water ☐ Gas Project Actual Start Date

☐ Waste-water ☐ Landscape Project Actual Finish Date ☐ Primary Road & Storm Water Protection Project Cost (SAR) Supervision Consultant Information Name & Contact Info Stamp & Signature Supervision Consultant Declaration

I hereby confirm that I possess a valid license under related KSA Law, ECA regulations and rules, and herby that all design, engineering, traffic, safety and environmental studies are in compliance with the applicable and required regulations, building codes, approved planning and design guidelines, and good industry practice necessary for construction and future operation of the project. In addition, I hereby undertake to apply for any additional license may ECA require.

Authorized Design Review Consultant Name & Contact Info Stamp & Signature Authorized Testing & Commissioning Consultant Declaration

I certify that the project under this request has been inspected and found fit for Operation. Owner may; under this license, operate this facility/project according to rules and regulation of the Economic Cities Authority. ECA has the right to cancel this Certificate if found that the facility/project is facing technical difficulties or not operating as required.

Construction Contractor Name & Contact Info Stamp & Signature Licensed Contractor Declaration

I hereby confirm that the site and network located at the above address has been constructed per the approved contract documents, the approved design and drawings and good industry practices and is ready for occupancy.

Applicant Information

ECA Official Approval Name & Contact Info Stamp & Signature Approved ☐ Revise & Resubmit ☐ Contact Info.

Applicant Undertaking Declaration

I certify that I have read the application and declare that the above information is correct and that I am the owner or the duly authorized agent of the owner. I agree to comply with all KSA laws, ECA regulations and rules relating to facility / infrastructure system/s. I hereby authorize representatives of ECA to enter the above-property for inspection and monitoring purposes.

Permitting Manager

Bay La Sun - 7082 Unit (2) King Abdullah Economic

City - 2396 - 2522 Kingdom of Saudi Arabia

Tel: +966 12 610 6700 - Fax: +966 12 610 6767

e-Mail : [email protected]

www.eca.gov.sa

Economic Cities Authority

Real Estate & Municipal Affairs

Municipalities Department

Infrastructure Operation Permit Application Infrastructure Completion Certificate Information

Certificate Number

Print Date

Developer/Sub-Developer Manager

Operation and Maintenance Contractor Name

Name &Contact Info Stamp Mobile No

Commercial Registration No.

Email I hereby affirm that I possess a full force and effective license under related KSA law, and herby undertake to apply for a license under provision of ECA if, I’m not already licensed under such provision.

Operation Contractor Information

Name

Insurance Company Mobile No

Insurance Company Name Stamp Email Policy No.

ECA Official Approval Expiry Date

Office Manager’s / Representative's Signature & Stamp: Approved ☐ Rejected ☐

Applicant Information

Date:

Name &Contact Info Stamp Permitting Manager

Applicant Declaration

I certify that I have read the application and declare that the above information is correct and that I am the owner or the duly authorized agent of the owner. I agree to comply with all laws relating to building construction. I hereby authorize representatives of ECA to enter the above-property for inspection and monitoring purposes.

Owner / Representative's Signature & Stamp:

Bay La Sun - 7082 Unit (2) King Abdullah Economic

City - 2396 - 2522 Kingdom of Saudi Arabia

Tel: +966 12 610 6700 - Fax: +966 12 610 6767

e-Mail : [email protected]

www.eca.gov.sa

Economic Cities Authority

Real Estate & Municipal Affairs

Municipalities Department

Infrastructure Operation Permit Renewal Application Operation Permit Information

Permit Number

Print Date

Developer/Sub-Developer Manager

Operation and Maintenance Contractor Name

Name &Contact Info Stamp Mobile No

Commercial Registration No.

Email I hereby affirm that I possess a full force and effective license under related KSA law, and herby undertake to apply for a license under provision of ECA if, I’m not already licensed under such provision.

Operation Contractor Information

Name

Insurance Company Mobile No

Insurance Company Name Stamp Email

Policy No.

ECA Official Approval Expiry Date

Office Manager’s / Representative's Signature & Stamp: Approved ☐ Rejected ☐

Applicant Information

Date:

Name &Contact Info Stamp Permitting Manager

Applicant Declaration

I certify that I have read the application and declare that the above information is correct and that I am the owner or the duly authorized agent of the owner. I agree to comply with all laws relating to building construction. I hereby authorize representatives of ECA to enter the above-property for inspection and monitoring purposes.

Owner / Representative's Signature & Stamp:

Bay La Sun - 7082 Unit (2) King Abdullah Economic

City - 2396 - 2522 Kingdom of Saudi Arabia

Tel: +966 12 610 6700 - Fax: +966 12 610 6767

e-Mail : [email protected]

www.eca.gov.sa

Economic Cities Authority

Real Estate & Municipal Affairs

Municipalities Department

Infrastructure Construction Permit – Fast Track Permitting Application Project Information

Project Name Economic City Developer/Sub-developer District

Network Type Block Number ☐ Secondary Roads ☐ Firefighting Block Area (m2) ☐ HV ☐ Storm-water Drainage Number of Units ☐ MV/LV ☐ Irrigation Power Demand (MVA) ☐ Telecommunication ☐ Street Lighting Potable Water Demand (L/day) ☐ Potable Water ☐ Gas Waste-water Demands (L/s) ☐ Waste-water ☐ Landscape Planed Construction Start Date ☐ Primary Road & Storm Water Protection Planed Construction Finish Date

Design Consultant Information

Project Team Details

Name Stamp Developer/ Sub-developer

Engineering License Number

Name

Mobile No

I hereby confirm that I possess a valid license under related KSA Law, ECA regulations and rules, and herby that all design, engineering, traffic, safety and environmental studies are in compliance with the applicable and required regulations, building codes, approved planning and design guidelines, and good industry practice necessary for construction and future operation of the project. In addition, I hereby undertake to apply for any additional license may ECA require.

Email

Design Consultant Information

Name

Mobile No

Office Manager’s / Representative's Signature & Stamp: Email

Authorized Design Review Consultant Authorized Design Review Consultant

Name & Contact Info Stamp Name

I hereby confirm that I possess a valid license under related KSA Law, ECA regulations and rules, and herby that all design, engineering, traffic, safety and environmental studies are in compliance with the applicable and required regulations, building codes, approved planning and design guidelines, and good industry practice necessary for construction and future operation of the project. In addition, I hereby undertake to apply for any additional license may ECA require.

Mobile No

Email

Supervision Consultant

Name &Contact Info Stamp

Engineering License No

I hereby confirm that I possess a valid license under related KSA Law, ECA regulations and rules, and herby that all design, engineering, traffic, safety and environmental studies are in compliance with the applicable and required regulations, building codes, approved planning and design guidelines, and good industry practice necessary for construction and future operation of the project. In addition, I hereby undertake to apply for any additional license may ECA require.

Office Manager’s / Representative's Signature & Stamp:

Bay La Sun - 7082 Unit (2) King Abdullah Economic

City - 2396 - 2522 Kingdom of Saudi Arabia

Tel: +966 12 610 6700 - Fax: +966 12 610 6767

e-Mail : [email protected]

www.eca.gov.sa

Economic Cities Authority

Real Estate & Municipal Affairs

Municipalities Department

Construction Contractor

Name &Contact Info Stamp

Commercial Registration No.

I hereby confirm that I possess a valid license under related KSA Law, ECA regulations and rules, and herby that all design, engineering, traffic, safety and environmental studies are in compliance with the applicable and required regulations, building codes, approved planning and design guidelines, and good industry practice necessary for construction and future operation of the project. In addition, I hereby undertake to apply for any additional license may ECA require.

Insurance Company

Insurance Company Name Stamp Policy No.

Expiry Date

Office Manager’s / Representative's Signature & Stamp:

Applicant Information

Name & Contact Info Stamp

ECA Official Approval

Applicant Declaration

Approved ☐ Rejected ☐ I certify that I have read the application and declare that the above information is correct and that I am the owner or the duly authorized agent of the owner. I agree to comply with all KSA laws, ECA regulations and rules relating to building construction. I hereby authorize representatives of ECA to enter the above-property for inspection and monitoring purposes.

Date:

` Permitting Manager

Owner / Representative's Signature & Stamp:

Bay La Sun - 7082 Unit (2) King Abdullah Economic

City - 2396 - 2522 Kingdom of Saudi Arabia

Tel: +966 12 610 6700 - Fax: +966 12 610 6767

e-Mail : [email protected]

www.eca.gov.sa

Economic Cities Authority

Real Estate & Municipal Affairs

Municipalities Department

Utilities Design Certificate Application Project Information

Project Name Economic City Developer/Sub-developer District

Utility Type (☐ Permanent ☐ Temporary) Block Number ☐ Sewage Treatment Plant ☐ Water Reservoir Plot Number ☐ Electrical Substation ☐ Pump Station Utility’ Capacity ☐ Water Desalination Plant ☐ Telecom Tower Planed Construction Start Date ☐ Power Generation Plant ☐ Central Data Unit Planed Construction Finish Date

☐ Gas Station

Design Consultant Information

Project Team Details

Name Stamp Developer/ Sub-developer

Engineering License Number

Name

Mobile No

I hereby affirm that I possess a full force and effective license under related KSA Law, and herby that all design, engineering, traffic, safety and environmental studies are in compliance with the applicable and required regulations, building codes, approved planning and design guidelines, and good industry practice necessary for construction and future operation of the project. Also, I hereby undertake to apply for a license under provision of ECA if, I’m not already licensed under such provision.

Email

Design Consultant Information

Name

Mobile No

Office Manager’s / Representative's Signature & Stamp: Email

Authorized Design Review Consultant Authorized Design Review Consultant

Name & Contact Info Stamp Name

I hereby affirm that I possess a full force and effective license under related KSA law, and herby undertake to apply for a license under provision of ECA if, I am not already licensed under such provision. I hereby affirm that the Design of this Project, under this application, complies with the provisions of the building codes for Economic Cities Authority and related regulations and laws including Safety and Environment.

Mobile No

Email

ECA Official Approval

Office Manager’s / Representative's Signature & Stamp: Approved ☐ Rejected ☐

Applicant Information

Date:

Name & Contact Info Stamp Permitting Manager

Applicant Declaration

`

I certify that I have read the application and declare that the above information is correct and that I am the owner or the duly authorized agent of the owner. I agree to comply with all laws relating to building construction. I hereby authorize representatives of ECA to enter the above-property for inspection and monitoring purposes.

Owner / Representative's Signature & Stamp:

Bay La Sun - 7082 Unit (2) King Abdullah Economic

City - 2396 - 2522 Kingdom of Saudi Arabia

Tel: +966 12 610 6700 - Fax: +966 12 610 6767

e-Mail : [email protected]

www.eca.gov.sa

Economic Cities Authority

Real Estate & Municipal Affairs

Municipalities Department

Utilities Design Certificate Renewal Application Expired Utilities Design Certificate Information

Permit Number Print Date Project Revised Plan Revised Construction Start Date Revised Construction Completion Date Applicant Information

Project Team Details

Name & Contact Info Stamp

Design Consultant Information

Applicant Declaration

Name

I certify that I have read the application and declare that the above information is correct and that I am the owner or the duly authorized agent of the owner. I agree to comply with all laws relating to building construction. I hereby authorize representatives of ECA to enter the above-property for inspection and monitoring purposes. Owner / Representative's Signature & Stamp:

Mobile No

Email

Authorized Design Review Consultant Information

Name

Mobile No

Email

ECA Official Approval

Approved ☐ Rejected ☐

Date:

Permitting Manager

`

Bay La Sun - 7082 Unit (2) King Abdullah Economic

City - 2396 - 2522 Kingdom of Saudi Arabia

Tel: +966 12 610 6700 - Fax: +966 12 610 6767

e-Mail : [email protected]

www.eca.gov.sa

Economic Cities Authority

Real Estate & Municipal Affairs

Municipalities Department

Utilities Design Modification Permit Application Please, Fill Only the Information of the Latest Issued Permit/Certificate Design Certificate Information

Number Print Date Construction Permit Information

Number Print Date Operation Permit Information

Number

Print Date

Modification Type ☐ Process and Technology ☐ Utility Location

☐ System Upgrade ☐ Discharged Network

☐ Unit Provision ☐ Downsizing/Decreasing Capacity

Design Consultant Information

Project Team Details

Name Stamp Design Consultant Information

Engineering License Number

Name Mobile No

I hereby affirm that I possess a full force and effective license under related KSA Law, and herby that all design, engineering, traffic, safety and environmental studies are in compliance with the applicable and required regulations, building codes, approved planning and design guidelines, and good industry practice necessary for construction and future operation of the project. Also, I hereby undertake to apply for a license under provision of ECA if, I’m not already licensed under such provision.

Email

Authorized Design Review Consultant

Name

Mobile No

Office Manager’s / Representative's Signature & Stamp: Email

Authorized Design Review Consultant (for Process and Technology Change)

Name & Contact Info Stamp I hereby affirm that I possess a full force and effective license under related KSA law, and herby undertake to apply for a license under provision of ECA if, I am not already licensed under such provision. I hereby affirm that the Design of this Project, under this application, complies with the provisions of the building codes for Economic Cities Authority and related regulations and laws including Safety and Environment.

ECA Official Approval

Office Manager’s / Representative's Signature & Stamp: Approved ☐ Rejected ☐

Applicant Information

Date:

Name & Contact Info Stamp Permitting Manager

Applicant Declaration

`

I certify that I have read the application and declare that the above information is correct and that I am the owner or the duly authorized agent of the owner. I agree to comply with all laws relating to building construction. I hereby authorize representatives of ECA to enter the above-property for inspection and monitoring purposes.

Owner / Representative's Signature & Stamp:

Bay La Sun - 7082 Unit (2) King Abdullah Economic

City - 2396 - 2522 Kingdom of Saudi Arabia

Tel: +966 12 610 6700 - Fax: +966 12 610 6767

e-Mail : [email protected]

www.eca.gov.sa

Economic Cities Authority

Real Estate & Municipal Affairs

Municipalities Department

Utilities Construction Permit Application Utility Information

Project Name

Utility Type

Valid Design Certificate Number

Economic City

Planed Construction Start Date Planed Construction Finish Date Project Cost (SAR)

Supervision Consultant

Project Team Details

Name &Contact Info Stamp Developer/ Sub-developer

Engineering License No

Name

I hereby affirm that I possess a full force and effective license under related KSA Law, and herby that all design, engineering, traffic, safety and environmental studies are in compliance with the applicable and required regulations, building codes, approved planning and design guidelines, and good industry practice necessary for construction and future operation of the project. Also, I hereby undertake to apply for a license under provision of ECA if, I’m not already licensed under such provision.

Mobile No

Email

Construction Contractor Manager

Name

Mobile No

Office Manager’s / Representative's Signature & Stamp: Email

Construction Contractor Supervision Consultant Project Manager

Name &Contact Info Stamp Name

Commercial Registration No.

Mobile No

I hereby affirm that I possess a full force and effective license under related KSA law, and herby undertake to apply for a license under provision of ECA if, I’m not already licensed under such provision.

Email

Insurance Company

Insurance Company Name Stamp Policy No.

ECA Official Approval Expiry Date

Office Manager’s / Representative's Signature & Stamp: Approved ☐ Rejected ☐

Applicant Information

Date:

Name &Contact Info Stamp Permitting Manager

Applicant Declaration

I certify that I have read the application and declare that the above information is correct and that I am the owner or the duly authorized agent of the owner. I agree to comply with all laws relating to building construction. I hereby authorize representatives of ECA to enter the above-property for inspection and monitoring purposes.

Owner / Representative's Signature & Stamp:

Bay La Sun - 7082 Unit (2) King Abdullah Economic

City - 2396 - 2522 Kingdom of Saudi Arabia

Tel: +966 12 610 6700 - Fax: +966 12 610 6767

e-Mail : [email protected]

www.eca.gov.sa

Economic Cities Authority

Real Estate & Municipal Affairs

Municipalities Department

Utilities Construction Permit Renewal Application Expired Utilities Construction Permit Information

Permit Number

Print Date

Project Revised Plan

Revised Construction Finish Date

Supervision Consultant

Project Team Details

Name &Contact Info Stamp Developer/ Sub-developer

Engineering License No

Name

I hereby affirm that I possess a full force and effective license under related KSA Law, and herby that all design, engineering, traffic, safety and environmental studies are in compliance with the applicable and required regulations, building codes, approved planning and design guidelines, and good industry practice necessary for construction and future operation of the project. Also, I hereby undertake to apply for a license under provision of ECA if, I’m not already licensed under such provision.

Mobile No

Email

Construction Contractor Manager

Name

Mobile No

Office Manager’s / Representative's Signature & Stamp: Email

Construction Contractor Supervision Consultant Project Manager

Name &Contact Info Stamp Name

Commercial Registration No.

Mobile No

I hereby affirm that I possess a full force and effective license under related KSA law, and herby undertake to apply for a license under provision of ECA if, I’m not already licensed under such provision.

Email

Insurance Company

Insurance Company Name Stamp Policy No.

ECA Official Approval Expiry Date

Office Manager’s / Representative's Signature & Stamp: Approved ☐ Rejected ☐

Applicant Information

Date:

Name &Contact Info Stamp Permitting Manager

Applicant Declaration

I certify that I have read the application and declare that the above information is correct and that I am the owner or the duly authorized agent of the owner. I agree to comply with all laws relating to building construction. I hereby authorize representatives of ECA to enter the above-property for inspection and monitoring purposes.

Owner / Representative's Signature & Stamp:

Bay La Sun - 7082 Unit (2) King Abdullah Economic

City - 2396 - 2522 Kingdom of Saudi Arabia

Tel: +966 12 610 6700 - Fax: +966 12 610 6767

e-Mail : [email protected]

www.eca.gov.sa

Economic Cities Authority

Real Estate & Municipal Affairs

Municipalities Department

Utilities Operation Permit Application Utility Information

Utility Name Economic City

Developer/Sub-developer District

Utility Type (☐ Permanent ☐ Temporary) Block Number

☐ Sewage Treatment Plant ☐ Water Reservoir Plot Number ☐ Electrical Substation ☐ Pump Station Utility’ Capacity ☐ Water Desalination Plant ☐ Telecom Tower Actual Construction Finish Date ☐ Power Generation Plant ☐ Central Data Unit

☐ Gas Station

Developer/Sub-Developer Manager

Operation and Maintenance Contractor Name

Name &Contact Info Stamp Mobile No Commercial Registration No.

Email I hereby affirm that I possess a full force and effective license under related KSA law, and herby undertake to apply for a license under provision of ECA if, I’m not already licensed under such provision.

Operation Contractor Information

Name

Insurance Company Mobile No Insurance Company Name Stamp Email

Policy No.

ECA Official Approval Expiry Date

Office Manager’s / Representative's Signature & Stamp: Approved ☐ Rejected ☐

HS&E Consultant Name &Contact Info Stamp Permitting Manger

I hereby affirm that I possess a full force and effective license under related KSA law, and herby undertake to apply for a license under provision of ECA if, I’m not already licensed under such provision.

Applicant Information

Name &Contact Info Stamp

Applicant Declaration

I certify that I have read the application and declare that the above information is correct and that I am the owner or the duly authorized agent of the owner. I agree to comply with all laws relating to building construction. I hereby authorize representatives of ECA to enter the above-property for inspection and monitoring purposes.

Owner / Representative's Signature & Stamp:

Bay La Sun - 7082 Unit (2) King Abdullah Economic

City - 2396 - 2522 Kingdom of Saudi Arabia

Tel: +966 12 610 6700 - Fax: +966 12 610 6767

e-Mail : [email protected]

www.eca.gov.sa

Economic Cities Authority

Real Estate & Municipal Affairs

Municipalities Department

Utilities Operation Permit Renewal Application Expired Utilities Operation Permit Utility Information

Permit Number

Print Date

Developer/Sub-Developer Manager

Operation and Maintenance Contractor Name

Name &Contact Info Stamp Mobile No Commercial Registration No.

Email I hereby affirm that I possess a full force and effective license under related KSA law, and herby undertake to apply for a license under provision of ECA if, I’m not already licensed under such provision.

Operation Contractor Information

Name

Insurance Company Mobile No Insurance Company Name Stamp Email

Policy No.

ECA Official Approval Expiry Date

Office Manager’s / Representative's Signature & Stamp: Approved ☐ Rejected ☐

HS&E Consultant Name &Contact Info Stamp Permitting Manger

I hereby affirm that I possess a full force and effective license under related KSA law, and herby undertake to apply for a license under provision of ECA if, I’m not already licensed under such provision.

Applicant Information

Name &Contact Info Stamp

Applicant Declaration

I certify that I have read the application and declare that the above information is correct and that I am the owner or the duly authorized agent of the owner. I agree to comply with all laws relating to building construction. I hereby authorize representatives of ECA to enter the above-property for inspection and monitoring purposes.

Owner / Representative's Signature & Stamp:

Bay La Sun - 7082 Unit (2) King Abdullah Economic

City - 2396 - 2522 Kingdom of Saudi Arabia

Tel: +966 12 610 6700 - Fax: +966 12 610 6767

e-Mail : [email protected]

www.eca.gov.sa

Economic Cities Authority

Real Estate & Municipal Affairs

Municipalities Department

Utilities Construction Permit – Fast Tracking Permitting Application Project Information

Project Name Economic City Developer/Sub-developer District

Utility Type (☐ Permanent ☐ Temporary) Block Number ☐ Sewage Treatment Plant ☐ Water Reservoir Plot Number ☐ Electrical Substation ☐ Pump Station Utility’ Capacity ☐ Water Desalination Plant ☐ Telecom Tower Planed Construction Start Date ☐ Power Generation Plant ☐ Central Data Unit Planed Construction Finish Date

☐ Gas Station

Design Consultant Information

Project Team Details

Name Stamp Developer/ Sub-developer

Engineering License Number

Name

Mobile No

I hereby affirm that I possess a full force and effective license under related KSA Law, and herby that all design, engineering, traffic, safety and environmental studies are in compliance with the applicable and required regulations, building codes, approved planning and design guidelines, and good industry practice necessary for construction and future operation of the project. Also, I hereby undertake to apply for a license under provision of ECA if, I’m not already licensed under such provision.

Email

Design Consultant Information

Name

Mobile No

Office Manager’s / Representative's Signature & Stamp: Email

Authorized Design Review Consultant Authorized Design Review Consultant

Name & Contact Info Stamp Name

I hereby affirm that I possess a full force and effective license under related KSA law, and herby undertake to apply for a license under provision of ECA if, I am not already licensed under such provision. I hereby affirm that the Design of this Project, under this application, complies with the provisions of the building codes for Economic Cities Authority and related regulations and laws including Safety and Environment.

Mobile No

Email

Office Manager’s / Representative's Signature & Stamp:

Supervision Consultant

Name &Contact Info Stamp

Engineering License No

I hereby confirm that I possess a valid license under related KSA Law, ECA regulations and rules, and herby that all design, engineering, traffic, safety and environmental studies are in compliance with the applicable and required regulations, building codes, approved planning and design guidelines, and good industry practice necessary for construction and future operation of the project. In addition, I hereby undertake to apply for any additional license may ECA require.

Office Manager’s / Representative's Signature & Stamp:

Bay La Sun - 7082 Unit (2) King Abdullah Economic

City - 2396 - 2522 Kingdom of Saudi Arabia

Tel: +966 12 610 6700 - Fax: +966 12 610 6767

e-Mail : [email protected]

www.eca.gov.sa

Economic Cities Authority

Real Estate & Municipal Affairs

Municipalities Department

Construction Contractor

Name &Contact Info Stamp

Commercial Registration No.

I hereby confirm that I possess a valid license under related KSA Law, ECA regulations and rules, and herby that all design, engineering, traffic, safety and environmental studies are in compliance with the applicable and required regulations, building codes, approved planning and design guidelines, and good industry practice necessary for construction and future operation of the project. In addition, I hereby undertake to apply for any additional license may ECA require.

Insurance Company

Insurance Company Name Stamp Policy No.

Expiry Date

Office Manager’s / Representative's Signature & Stamp:

Applicant Information

ECA Official Approval

Name & Contact Info Stamp Approved ☐ Rejected ☐

Applicant Declaration

Permitting Manager I certify that I have read the application and declare that the above information is correct and that I am the owner or the duly authorized agent of the owner. I agree to comply with all laws relating to building construction. I hereby authorize representatives of ECA to enter the above-property for inspection and monitoring purposes.

Owner / Representative's Signature & Stamp:

Bay La Sun - 7082 Unit (2) King Abdullah Economic

City - 2396 - 2522 Kingdom of Saudi Arabia

Tel: +966 12 610 6700 - Fax: +966 12 610 6767

e-Mail : [email protected]

www.eca.gov.sa

Economic Cities Authority

Real Estate & Municipal Affairs

Municipalities Department

Grading and Ground Leveling Works Application Survey Information

Master Developer/ Sub-developer

Economic City District Neighborhood Leveling Reange Work Completion Plan

Start Date Finish Date Master Developer, Primary Infrastructure Dept. Project Team Details

Name & Contact Info Stamp Surveyor Information

Name

I certify that I have read the application and declare that the above information is correct. I agree to comply with ECA regulations, codes & standards, guidelines and city master plan.

Mobile No

Email

Owner / Representative's Signature & Stamp:

Applicant Information

ECA Official Approval

Name & Contact Info Stamp

Approved ☐ Rejected ☐

Applicant Declaration

Date:

Permitting Manager

I certify that I have read the application and declare that the above information is correct and that I am the owner or the duly authorized agent of the owner. I agree to comply with all KSA laws, ECA regulations and rules relating to building construction. I hereby authorize representatives of ECA to enter the above-property for inspection and monitoring purposes.

`

Owner / Representative's Signature & Stamp:

Bay La Sun - 7082 Unit (2) King Abdullah Economic

City - 2396 - 2522 Kingdom of Saudi Arabia

Tel: +966 12 610 6700 - Fax: +966 12 610 6767

e-Mail : [email protected]

www.eca.gov.sa

Economic Cities Authority

Real Estate & Municipal Affairs

Municipalities Department

Geotechnical and Topographical Survey Application Survey Information

Master Developer/ Sub-developer

Economic City District Neighborhood Work Completion Plan

Start Date Finish Date Master Developer, Primary Infrastructure Dept. Project Team Details

Name & Contact Info Stamp Surveyor Information

Name

I certify that I have read the application and declare that the above information is correct. I agree to comply with ECA regulations, codes & standards, guidelines and city master plan.

Mobile No

Email

Owner / Representative's Signature & Stamp:

Applicant Information

ECA Official Approval

Name & Contact Info Stamp

Approved ☐ Rejected ☐

Applicant Declaration

Date:

Permitting Manager

I certify that I have read the application and declare that the above information is correct and that I am the owner or the duly authorized agent of the owner. I agree to comply with all KSA laws, ECA regulations and rules relating to building construction. I hereby authorize representatives of ECA to enter the above-property for inspection and monitoring purposes.

`

Owner / Representative's Signature & Stamp:

ANNEX-4(Permitting Process Flowchart)

Design Certificate Flowchart

Desig

n Co

nsul

tant

MD/

Sub-

Dev

DRC

Smar

t Ser

vice

Ce

nter

Mun

icip

ality

Fina

nce

INFRASTRUCTURE

Receive Requiremnts

Detailed Design

Reviewing Detailed Design and Workshop

START Requesting

Review Submittal

Close Comments

9 Days

Issue Invoice

Pay The Invoice

1 Day

Permit IssuanceComments

YES

NO

ECA

5 Days

Design Certificate Flowchart

Desig

n Co

nsul

tant

MD/

Sub-

Dev

DRC

Smar

t Ser

vice

Ce

nter

Mun

icip

ality

Fina

nce

INFRASTRUCTURE

Receive Requiremnts

Detailed Design

Reviewing Detailed Design and Workshop

START Requesting

Review Submittal

Close Comments

9 Days

Issue Invoice

Pay The Invoice

1 Day

Permit IssuanceComments

YES

NO

ECA

5 Days

Design Certificate Flowchart

Desig

n Co

nsul

tant

MD/

Sub-

Dev

DRC

Smar

t Ser

vice

Ce

nter

Mun

icip

ality

Fina

nce

INFRASTRUCTURE

Receive Requiremnts

Detailed Design

Reviewing Detailed Design and Workshop

START Requesting

Review Submittal

Close Comments

9 Days

Issue Invoice

Pay The Invoice

1 Day

Permit IssuanceComments

YES

NO

ECA

5 Days

Design Certificate Flowchart

Desig

n Co

nsul

tant

MD/

Sub-

Dev

DRC

Smar

t Ser

vice

Ce

nter

Mun

icip

ality

Fina

nce

INFRASTRUCTURE

Receive Requiremnts

Detailed Design

Reviewing Detailed Design and Workshop

START Requesting

Review Submittal

Close Comments

9 Days

Issue Invoice

Pay The Invoice

1 Day

Permit IssuanceComments

YES

NO

ECA

5 Days

Design Certificate Flowchart

Desig

n Co

nsul

tant

MD/

Sub-

Dev

DRC

Smar

t Ser

vice

Ce

nter

Mun

icip

ality

Fina

nce

INFRASTRUCTURE

Receive Requiremnts

Detailed Design

Reviewing Detailed Design and Workshop

START Requesting

Review Submittal

Close Comments

9 Days

Issue Invoice

Pay The Invoice

1 Day

Permit IssuanceComments

YES

NO

ECA

5 Days

Construction Permit Flowchart

Desig

n Co

nsul

tant

MD/

Sub-

Dev

DRC

Smar

t Ser

vice

Ce

nter

Mun

icip

ality

Fina

nce

INFRASTRUCTURE

START Requesting

Receive Requiremnts

Review Submittal

Close Comments

YES

Issue Invoice

Pay The Invoice

1 Day

Permit IssuanceComments9 Days

NO

ECA

5 Days

Completion Certificate Flowchart

MD/

Sub-

Dev

Desig

n Co

nsul

tant

Ove

rsig

htSm

art S

ervi

ce

Cent

erM

unic

ipal

ityFi

nanc

eDR

C

INFRASTRUCTURE

START Requesting

Receive Requiremnts

Review Submittal

Close All Comments

Invoice Issuance

Invoice Payment

Permit IssuanceComments

Workshop and Close

Comments

YES

9 Days

Site Inspection

DRC Site Inspection

No

ECA

5 Days

Final Inspection

5 Days

1 Day

Operation Permit Flowchart

Desig

n Co

nsul

tant

MD/

Sub-

Dev

Smar

t Ser

vice

Ce

nter

Mun

icip

ality

Fina

nce

INFRASTRUCTURE

START Requesting

Receive Requiremnts

Review Submittal

Close Comments

9 Days

Issue Invoice

Pay The Invoice

1 Day

Permit IssuanceComments

YES

NO

ECA

Design Certificate Flowchart

Desig

n Co

nsul

tant

MD/

Sub-

Dev

DRC

Smar

t Ser

vice

Ce

nter

Mun

icip

ality

Fina

nce

UTILITIES

Receive Requiremnts

Detailed Design

Reviewing Tendering Package and Workshop

START Requesting

Review & Comment

Close Comments

9 Days

Issue Invoice

Pay The Invoice

1 Day

Permit IssuanceComments

YES

NO

ECA

5 Days

Construction Permit Flowchart

Desig

n Co

nsul

tant

MD/

Sub-

Dev

DRC

Smar

t Ser

vice

Ce

nter

Mun

icip

ality

Fina

nce

UTILITIES

START Requesting

Receive Requiremnts

Review & Comment

Close Comments

9 Days

Issue Invoice

Pay The Invoice

1 Day

Permit IssuanceComments

YES

NO

ECA

5 Days

Operation Permit Flowchart

MD/

Sub-

Dev

Desig

n Co

nsul

tant

Ove

rsig

htSm

art S

ervi

ce

Cent

erM

unic

ipal

ityFi

nanc

e

UTILITIES

START

Receive Requiremnts

Review

Close All Comments

Invoice Issuance

Invoice Payment

1 Day

Permit Issuance

1D

Comments

Workshop and Close Comments

YES

9 Days

Site Inspection

NO

ECA

5 Days

Final Inspection

5 Days

ANNEX-5(Waiver Request)

Bay La Sun - 7082 Unit (2) King Abdullah Economic

City - 2396 - 2522 Kingdom of Saudi Arabia

Tel: +966 12 610 6700 - Fax: +966 12 610 6767

e-Mail : [email protected]

www.eca.gov.sa

Economic Cities Authority

Real Estate & Municipal Affairs

Municipalities Department

WAIVER REQUEST Project Information Project Name

Master Developer/Sub-developer

Economic City

District

Project Completion Date

Permits Information

Design Certificate

Number Print Date

Construction Permit

Number Print Date

Type of Waiver ☐ Not completing road asphalting (Final layer)

☐ Not completing community landscape

☐ Telecommunication network is not active (FO Cable is not completed)

Waiver Justification

Completion Plan and Strategy

Completion Date

Applicant Information

ECA Official Approval

Name & Contact Info Stamp ☐Approved ☐Rejected

Applicant Declaration

Date:

I certify that I have read the application and declare that the above information is correct and that I am the owner or the duly authorized agent of the owner. I agree to comply with all laws relating to building construction. I hereby authorize representatives of ECA to enter the above-property for inspection and monitoring purposes. This waiver is a condition that must be fulfilled as part of the related permits. Owner / Representative's Signature & Stamp:

Permitting Manager

ANNEX-6DRC Infrastructure Review final Approval Applications

Bay La Sun - 7082 Unit (2) King Abdullah Economic

City - 2396 - 2522 Kingdom of Saudi Arabia

Tel: +966 12 610 6700 - Fax: +966 12 610 6767

e-Mail : [email protected]

www.eca.gov.sa

Economic Cities Authority

Real Estate & Municipality Affairs

Municipalities Department

Transport & Highways Systems Review Final Approval Application Project Name

Project Owner/Investor

Economic City Local Community Number

District Design Consultant

Local Community Name Authorized Review Consultant

Design Consultant Information

Consultant Name Signature & Stamp

Design Manager

Contact Information

I hereby confirm that I possess a valid license under related KSA Law, ECA regulations and rules, and herby that all transport & highways design, engineering, safety and environmental studies under this application, are in compliance with the applicable and required regulations, building codes, approved city master plan, and good industry practice necessary for construction and future operation. In addition, I hereby undertake to apply for any additional license may ECA required.

Authorized Design Review Consultant Information

Consultant Name Signature & Stamp

Design Review Manager

Contact Information

I hereby confirm that the design of these systems under this application, complies with the provisions of the designing codes for Economic Cities Authority and related regulations and laws including safety and environment.

ECA Official Approval

Permitting Manager Signature & Stamp

Terms & Conditions Approved ☐

Revise & Re-Submit ☐ Rejected ☐

Bay La Sun - 7082 Unit (2) King Abdullah Economic

City - 2396 - 2522 Kingdom of Saudi Arabia

Tel: +966 12 610 6700 - Fax: +966 12 610 6767

e-Mail : [email protected]

www.eca.gov.sa

Economic Cities Authority

Real Estate & Municipality Affairs

Municipalities Department

HV/MV/LV Power Systems Review Final Approval Application

Project Name

Project Owner/Investor Designed System ☐ HV ☐ MV ☐ LV

Economic City Local Community Number

District Design Consultant

Local Community Number Authorized Review Consultant

Design Consultant Information

Consultant Name Signature & Stamp

Design Manager

Contact Information I hereby confirm that I possess a valid license under related KSA Law, ECA regulations and rules, and herby that all electrical power systems design, engineering, safety and environmental studies under this application, are in compliance with the applicable and required regulations, building codes, approved city master plan, and good industry practice necessary for construction and future operation. In addition,, I hereby undertake to apply for any additional license may ECA required.

Authorized Design Review Consultant Information

Consultant Name Signature & Stamp

Design Review Manager

Contact Information

I hereby confirm that the design of these systems under this application, complies with the provisions of the building codes for Economic Cities Authority and related regulations and laws including Safety and Environment.

ECA Official Approval

Permitting Manager Signature & Stamp

Terms & Conditions Approved ☐

Revise & Re-Submit ☐ Rejected ☐

Bay La Sun - 7082 Unit (2) King Abdullah Economic

City - 2396 - 2522 Kingdom of Saudi Arabia

Tel: +966 12 610 6700 - Fax: +966 12 610 6767

e-Mail : [email protected]

www.eca.gov.sa

Economic Cities Authority

Real Estate & Municipality Affairs

Municipalities Department

Telecommunication System Review Final Approval Application Project Name

Project Owner/Investor Designed System ☐ Conduits ☐ Passive

Economic City Local Community Number

District Design Consultant

Local Community Name Authorized Review Consultant

Design Consultant Information

Consultant Name Signature & Stamp

Design Manager

Contact Information I hereby confirm that I possess a valid license under related KSA Law, ECA regulations and rules, and herby that all telecommunication system design, engineering, safety and environmental studies under this application, are in compliance with the applicable and required regulations, building codes, approved city master plan, and good industry practice necessary for construction and future operation. In addition, I hereby undertake to apply for any additional license may ECA required.

Authorized Design Review Consultant Information

Consultant Name Signature & Stamp

Design Review Manager

Contact Information I hereby confirm that the design of this system under this application, complies with the provisions of the building codes for Economic Cities Authority and related regulations and laws including Safety and Environment.

ECA Official Approval

Permitting Manager Signature & Stamp

Terms & Conditions Approved ☐

Revise & Re-Submit ☐ Rejected ☐

Bay La Sun - 7082 Unit (2) King Abdullah Economic

City - 2396 - 2522 Kingdom of Saudi Arabia

Tel: +966 12 610 6700 - Fax: +966 12 610 6767

e-Mail : [email protected]

www.eca.gov.sa

Economic Cities Authority

Real Estate & Municipality Affairs

Municipalities Department

Water & Waste-Water Systems Review Final Approval Application Project Name

Project Owner/Investor Designed System ☐ Water Demand ☐ Waste-Water

and TSE

Economic City Local Community Number

District Design Consultant

Local Community Name Authorized Review Consultant

Design Consultant Information

Consultant Name Signature & Stamp

Design Manager

Contact Information

I hereby confirm that I possess a valid license under related KSA Law, ECA regulations and rules, and herby that all water and waste-water design, engineering, safety and environmental studies under this application, are in compliance with the applicable and required regulations, building codes, approved city master plan, and good industry practice necessary for construction and future operation. In addition, I hereby undertake to apply for any additional license may ECA required.

Authorized Design Review Consultant Information

Consultant Name Signature & Stamp

Design Review Manager

Contact Information I hereby confirm that the design of these systems under this application, complies with the provisions of the building codes for Economic Cities Authority and related regulations and laws including Safety and Environment.

ECA Official Approval

Permitting Manager Signature & Stamp

Terms & Conditions Approved ☐

Revise & Re-Submit ☐ Rejected ☐

Bay La Sun - 7082 Unit (2) King Abdullah Economic

City - 2396 - 2522 Kingdom of Saudi Arabia

Tel: +966 12 610 6700 - Fax: +966 12 610 6767

e-Mail : [email protected]

www.eca.gov.sa

Economic Cities Authority

Real Estate & Municipality Affairs

Municipalities Department

Landscaping Review Final Approval Application Project Name

Project Owner/Investor Designed System ☐ Asphalting ☐ Others

Economic City Local Community Number

District Design Consultant

Local Community Name Authorized Review Consultant

Design Consultant Information

Consultant Name Signature & Stamp

Design Manager

Contact Information

I hereby confirm that I possess a valid license under related KSA Law, ECA regulations and rules, and herby that all landscaping design, engineering, safety and environmental studies under this application, are in compliance with the applicable and required regulations, building codes, approved city master plan, and good industry practice necessary for construction and future operation. In addition, I hereby undertake to apply for any additional license may ECA required.

Authorized Design Review Consultant Information

Consultant Name Signature & Stamp

Design Review Manager

Contact Information I hereby confirm that the design of the landscaping, under this application, complies with the provisions of the building codes for Economic Cities Authority and related regulations and laws including Safety and Environment.

ECA Official Approval

Permitting Manager Signature & Stamp

Terms & Conditions Approved ☐

Revise & Re-Submit ☐ Rejected ☐

Bay La Sun - 7082 Unit (2) King Abdullah Economic

City - 2396 - 2522 Kingdom of Saudi Arabia

Tel: +966 12 610 6700 - Fax: +966 12 610 6767

e-Mail : [email protected]

www.eca.gov.sa

Economic Cities Authority

Real Estate & Municipality Affairs

Municipalities Department

Storm-Water Drainage System Review Final Approval Application

Project Name

Project Owner/Investor Designed System ☐ Hydrological Study ☐ Conveying

System Economic City Local Community Number

District Design Consultant

Local Community Name Authorized Review Consultant

Design Consultant Information

Consultant Name Signature & Stamp

Design Manager

Contact Information

I hereby confirm that I possess a valid license under related KSA Law, ECA regulations and rules, and herby that all Storm-Water design, engineering, safety and environmental studies under this application, are in compliance with the applicable and required regulations, building codes, approved city master plan, and good industry practice necessary for construction and future operation. In addition, I hereby undertake to apply for any additional license may ECA required.

Authorized Design Review Consultant Information

Consultant Name Signature & Stamp

Design Review Manager

Contact Information I hereby confirm that the design of this system, under this application, complies with the provisions of the building codes for Economic Cities Authority and related regulations and laws including Safety and Environment.

ECA Official Approval

Permitting Manager Signature & Stamp

Terms & Conditions Approved ☐

Revise & Re-Submit ☐ Rejected ☐

+966 12 610 6700 +966 12 610 [email protected] [email protected]+966 12 610 6767 +966 12 610 6767www.eca.gov.sa www.eca.gov.sa

Bay La Sun, 7282 Unit 2King Abdullah Economic City, Rabigh, 23964–2522, KSA

2 7082 23964–2522