How to achieve Excellence in Turnarounds Thru Effective Human Resource Management
-
Upload
independent -
Category
Documents
-
view
1 -
download
0
Transcript of How to achieve Excellence in Turnarounds Thru Effective Human Resource Management
Contents
• Company Profile
• Turnaround - FFC Experience
• Human Resource Management
• Optimizing Human Resource
• Impact on Turnaround Performance
• Concluding Remarks
2
We are located at:
FFC-Gothmachhi
(02 Plants)
FFC-Mirpur Mathelo
(01 Plant)
Karachi
Islamabad
Pakistan
3
Preventive / Corrective Maintenance
Turnaround – FFC Experience
Philosophy
Replacements & improvement
Projects
Statutory inspections
Improved Efficiency Enhanced Reliability
Revitalized Plant
5
Timely Completion
Within Assigned Resources
Incident Free
Turnaround Goals
Turnaround – FFC Experience
Successful Turnaround
6
Turnaround – FFC Experience
Assisting
Pakistani
Companies
Participating
in TA’s of
International
companies
30
Turnarounds
in 28 Years
7
Human Resource Management
Acquiring Human Resource
Tackling Challenges
Optimizing Manpower
Maintaining Records
8
Meeting
Competency
Requirements
Human
Resource
Availability
Achieving
Safety
Objectives
Tackling
Behavioural
Issues
Defining Key
Competencies
Human Resource Management
Challenges
10
Challenges in Human Resource
Type of
Equipment
Nature of JobCriticality of
Job
Defining Key Competencies
COMPETENCY REQUIREMENT
11
Pre-qualification thru Committee
Education & Experience
Test and interviews
Approval
Data Entry
Selection
Meeting Competency Requirements
12
Understand Plant Safety Requirements
Objective
Learn Safe Working Procedures
Use of PPEsAwareness of Hazards
Mandatory Safety Induction Program
14
Challenges in Human Resource
Free boarding &
lodgingAttractive
Remuneration
Privileged
WorkplaceMedical
Coverage
Congenial Work
Environment
Motivational
Measures
Subsidized
Meals
15
Seamless performance
during Turnaround,
demands efficient
handling of issues
relating to human
behaviors.
Safety Violation
Job Quality
Carelessness
Misconduct
Tardiness
Punctuality
Hostile Attitude
Tackling Behavior Based Issues
16
Optimizing Human Resource
Adjust Resources
Schedule Resources
Prepare Resource Loading Plans
Daily Progress Analysis
Optimizing
17
0
200
400
600
800
1000
1200
1 2 3 4 5 6 7 8 9 10 11 12 13
N U
M B
E R
D A Y S
PLANNED
ACTUAL
Skilled Workforce Loading Plan -Typical
19
4%
10%
19%
28%
38%
48%
58%
66%
74%
80%85%
90%93% 95% 96% 97% 98% 99%
100%
0%3%
10%
16%
27%
39%
50%
61%
70%
77%
0%
20%
40%
60%
80%
100%
120%1
2-O
ct
13
-Oct
14
-Oct
15
-Oct
16
-Oct
17
-Oct
18
-Oct
19
-Oct
20
-Oct
21
-Oct
22
-Oct
23
-Oct
24
-Oct
25
-Oct
26
-Oct
27
-Oct
28
-Oct
29
-Oct
30
-Oct
31
-Oct
01
-No
v
PLAN
ACTUAL
99.7%
1%5%
14%
25%
35%
44%
53%
61%
67%
74%
80%
86%
92%96%
98% 99% 100%
1%4%
11%
20%
34%
48%
59%64%
74%
82%
0%
20%
40%
60%
80%
100%
120%
PLAN
ACTUAL
0%
7%
17%
29%
39%
51%
62%
72%
81%
88%
93% 95% 97% 98% 99.9% 100%
0% 1%
21%
36%
42%
58%
68%
75%79%
87%
0%
20%
40%
60%
80%
100%
120%
PLAN
ACTUAL
Daily Progress Analysis
Planned duration : 416 Hrs
Projected duration: 425 HrsOverall TA Plan
Planned duration : 332 Hrs
Projected duration: 340 Hrs
Urea Unit
F-201
19
26
18
8
10
4
0
5
10
15
20
25
30
35
100 RT HT / RT UREA GRADE JOINTS
PLANNED
ACTUAL
Status of HT/RT Jobs
20
Impact on Turnaround Performance
Effective Utilization of Resources has a lasting impact
on Turnaround Performance, where a slackness can
cost heavily and may result in:
−Extension in Turnaround Duration
−Poor Safety Performance
−Reduced Plant reliability and Efficiency
21
Impact on Turnaround Performance
Improved Efficiency
Schedule compliance
Enhanced Plant
Reliability
Safety Performance
22
Production increase
- Ammonia > 100 MTPD
- Urea ~ 125 MTPD
Energy consumption improvement
Before TA After TA
- Gcal / MeT Urea 6.70 6.38 [Gain 5%]
- Gcal / MeT NH3 >8.85 8.37 [Gain 5.5%]
- Nmc / MeT Urea 1080 1030
Improved Efficiency & Productivity
Statistics After Turnaround 2009 of Plant-I
24
FFC has excelled in Turnarounds through
effective human resource management and
achieved:
Concluding Remarks
− Outstanding Safety Performance
− Enhanced Plant reliability
− Improved Plant Efficiency
− Optimum Turnarounds Duration
27