Transcript of Ha Noi Metro Rail System Project (Line 3
External Environmental Monitoring Report
October 2020 – October 2021
May 2022
Viet Nam: Ha Noi Metro Rail System
Project (Line 3: Nhon-Ha Noi Station
Section)
Appendix 4.2
Prepared by TPF Getinsa Euroestudios (Project Management Support Phase 2 Consultant) for Ha Noi People’s Committee and the Asian Development Bank.
NOTE
In this report, “$” refers to US dollars. This external environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
Hanoi Pilot Light Metro line Project
Dự án đường sắt đô thị thí điểm Hà Nội Environmental monitoring report
Báo cáo quan trắc môi trường
Appendix/ Phụ lục 1: List of equipment/ Danh sách các thiết bị
a. Photo & description of monitoring equipment/ Ảnh và mô tả các thiết bị quan trắc
STT/
No.
Tên máy/ Name of
Equipment
Hình ảnh/ Picture Calibration
expiration/ Hạn hiệu chuẩn
Purpose to use/ Mục đích sử dụng/
1
C2P- 838-032
31/03/2021 Lấy mẫu không khí/
Sampling the air
2 Desega - GS
312
31/12/2021 Máy lấy mẫu không
khí/ Sampling the air
3 Extech -
445702
31/12/2021
May Đo các chỉ tiêu vi khí hậu / Meters for
microclimate indicators
4 Tenmars- TM103
31/12/2021 Máy đo tiếng ồn /
Noise meter
5 ACO – 3116 –
7812B
30/06/2021 Máy đo đọ rung/ Vibra-
tion Meter
Hanoi Pilot Light Metro line Project
Dự án đường sắt đô thị thí điểm Hà Nội Environmental monitoring report
Báo cáo quan trắc môi trường
b. List of PPE to be utilized, including while working near the lake.
Danh sách BHLĐ sử dụng trong quá trình quan trắc
1. Safety helmet/ Mũ bảo hộ
2. Safety vest/ Aó phản quang
3. Safety shoes/ Giày bảo hộ
4. Safety gloves/ Găng tay bảo hộ
5. Safety life vest/ 6. Aó phao
Hanoi Pilot Light Metro line Project
Dự án đường sắt đô thị thí điểm Hà Nội Environmental monitoring report
Báo cáo quan trắc môi trường
Appendix 2. Pictures for taking sample/ Hình ảnh lấy mẫu
Taking sample minutes/ Họp an toàn trước khi lấy mẫu
Taking sample pictures/ Hình ảnh lấy mẫu
Hanoi Pilot Light Metro line Project
Dự án đường sắt đô thị thí điểm Hà Nội Environmental monitoring report
Báo cáo quan trắc môi trường
Hanoi Pilot Light Metro line Project
Dự án đường sắt đô thị thí điểm Hà Nội Environmental monitoring report
Báo cáo quan trắc môi trường
Hanoi Pilot Light Metro line Project
Dự án đường sắt đô thị thí điểm Hà Nội Environmental monitoring report
Báo cáo quan trắc môi trường
Hanoi Pilot Light Metro Project Environmental monitoring report
Appendix 3: Monitoring results
(Please see next page for details)
Hanoi Pilot Light Metro Project Environmental monitoring report
Doc No: HGU-IMP-TRE-WAE-L10-00015-E-1A Page 4/31
Abbreviations
MRB Hanoi Metropolitan Railway Management Board
PIC Project Implementation Consultant (SYSTRA S.A.)
HGU Hyundai Engineering & Construction Co., Ltd. – Ghella S.p.A Joint Venture
(Underground Section)
EATC Environment Analysing & Technique…,JSC
Project References
Ref
No. Ref ID number Ref description
1 HGU-IMP-TRE-WAE-L10-00015-V-1A Environmental Monitoring
Report for Construction Stage 14
Hanoi Pilot Light Metro Project Environmental monitoring report
Doc No: HGU-IMP-TRE-WAE-L10-00015-E-1A Page 5/31
CONTENTS
1. INTRODUCTION ............................................................................................................... 6
1.1 General information: ............................................................................................................ 6
1.2 The project information: ....................................................................................................... 6
1.3 Environment monitoring activities: ....................................................................................... 6
2. MONITORING PROGRAM ................................................................................................ 7
2.1. Monitoring location ............................................................................................................. 7
2.2. Parameter and monitoring frequency ..................................................................................10
2.3. Method and monitoring equipment .....................................................................................11
2.4. Analysis method .................................................................................................................13
2.5. Position and sites for taking sample ....................................................................................14
2.6. Conditions of taking samples ..............................................................................................17
3. COMMENTS AND MONITORING RESULTS ASSESSMENT:......................................... 19
3.1. Noise monitoring ................................................................................................................19
3.2. Vibration monitoring ..........................................................................................................22
Diagram 11: Comparison Fe in surface water ............................................................................30
3.5 Soil Quality Monitoring.......................................................................................................30
4. COMMENTS AND RESULT ASSESSMENT ON QA/QC IMPLEMENTATION IN ENVI-
RONMENTAL MONITORING:............................................................................................... 30
4.1 Field QA/QC results: ........................................................................................................... 30
4.2 Lab QA/QC results: ............................................................................................................. 31
5. Risk assessment ................................................................................................................. 31
6. Conclusion & Recommendations ....................................................................................... 31
6.1 Conclusion ........................................................................................................................ 31
6.2 Recommendations: ............................................................................................................ 32
7. Appendices ........................................................................................................................ 32
Hanoi Pilot Light Metro Project Environmental monitoring report
Doc No: HGU-IMP-TRE-WAE-L10-00015-E-1A Page 6/31
1. INTRODUCTION
1.1 General information:
Construction contractor: Hyundai E&C Co., Ltd and Ghella S.P.A Joint Venture.
1.2 The project information:
Hanoi Pilot Light Metro Line, line 3, section Nhon - Hanoi Railway Station is a major
project for Hanoi City. According to the Hanoi Transportation Master Plan till 2022, total length
of HPLML (Line 3) shall reach 21,5km from Nhon to Hoang Mai. The first phase of this line,
and part of this Contract is from Nhon to Hanoi Railway Station, with about 8.5 km elevated
section and 4.0 km underground section. This line includes 12 stations (with 8 elevated and 4
underground stations). The Depot is located at Nhon with area of 150,550 m2.
Comply to environmental management plan, HGU has coordinated with EATC to con-
duct environmental monitoring and analysis at a frequency of 3 months.
During pre-construction period, environmental monitoring activities are subject to assess
quality of the environment in the project area before implementation of construction activities.
Simultaneously, these activities shall collect data which is the basis for assessing, comparing the
effects of road construction activities to environment quality. On the other hand, it is also essen-
tial requirements for environmental protection activities that HGU must be complied.
On 01,02th April 2021, HGU cooperated with EATC to carry out environmental moni-
toring and sampling for construction stage 14 of CP03 package.
1.3 Environment monitoring activities:
- Scopes of work: Analyzing environmental quality. Measuring noise, vibration, surface water, collecting data
Completing the Quarterly Environmental Monitoring Reports - Legal Documents for carrying out the monitoring process: The Environmental Protection Law of Vietnam 2014. Decree 18/2015/BTNMT on environmental protection planning, strategic environ-
mental assessment, environmental impact assessment and environmental protection planning. Circular 27/2015/TT-BTNMT on Strategic environmental assessment, environmen-
tal impact assessment and environmental protection law. Circular 43/2015/TT-BTNMT on state of the environment report, set of environ-
ment indicators and management of environment monitoring data. Circular 24/2017/TT-BTNMT dated September 01, 2017 on environmental moni-
toring techniques
Viet Nam Environment Standards for environmental protection is from 1998 to now.
Hanoi Pilot Light Metro Project Environmental monitoring report
Doc No: HGU-IMP-TRE-WAE-L10-00015-E-1A Page 7/31
Environmental Management Plan of project - Standards applicable:
Air environment: + Micro-environment: QCVN 26:2016/BYT. + Noise: QCVN 26:2010/BTNMT. + Vibration Acceleration: QCVN 27:2010/BTNMT. + Toxic gases: QCVN 05:2013/BTNMT. Water Environment: + Surface water: QCVN 08-MT:2015/BTNMT, column B2
+ Underground water: QCVN 09-MT:2015/BTNMT
Soil Environment: + Soil environment: QCVN 03-MT:2015/BTNMT
2. MONITORING PROGRAM
2.1. Monitoring location
2.1.1. Noise, vibration and air monitoring
Project Hanoi Pilot Light Metro Line section Nhon – Ha Noi railway station, environ-
mental monitoring activities for air, noise, and vibration has been followed by Circular
24/2017/TT-BTNMT dated September 01, 2017 on environmental monitoring techniques. Base
on approved CP03 – Environment monitoring Schedule, and CP03 construction activities on site
at Ramp, Station 9, Station 10, air, noise, vibration have been carried out at the same location as
the follow:
+ K 1: Area of 555 alley, Kim Ma street. Coordinates: N: 21° 1' 46.511" E: 105° 48' 35.370"
+ K 2: Area of 475 Kim Ma street, near Daewoo intersection. Coordinates: N: 21° 1' 53.269" E: 105° 49' 23.051"
+ K 3: Kim Ma communal house. Coordinates: N: 21° 1' 53.379" E: 105° 49' 42.073"
+ K 4: Area of Cat Linh Primary school, 31A Cat Linh Street, Dong Da District, Ha Noi. Coordinates:
N: 2101’44.464’’, E: 105049’45.798”
+ K5: Area of Temple of Literature gate. Coordinates: N: 2101’38.698’’, E: 105050’6.655”
+ K6: Area of Heart Hospital, Tran Hung Dao street, Ha Noi. Coordinates: N: 2101’24.514’’, E: 105050’36.167”
2.1.2. Water quality monitoring
Monitoring activities of surface water quality followed the Circular 24/2017/TT-BTNMT dated
September 01, 2017 on environmental monitoring techniques. Surface water monitoring activity is carried out at 2 locations
Hanoi Pilot Light Metro Project Environmental monitoring report
Doc No: HGU-IMP-TRE-WAE-L10-00015-E-1A Page 8/31
+ NM1: Surface water of Thu Le lake. Coordinates: N: 21° 1' 48.316" , E: 105° 48' 37.603"
+ NM2: Surface water of Giang Vo lake. Coordinates: N: 21° 1' 46.620", E: 105° 49' 11.558"
+ NM3: Surface water of Van Mieu lake. Coordinates: N: 21°01’36.880’’, E: 105°50’6.00”
2.1.3 Soil quality monitoring
+ Đ1: Soil sample taken at Ramp area. Coordinates: N: 21° 1' 48.61”, E: 105°48'36.025"
+ Đ2: Soil sample taken at Kim Ma station. Coordinates: N: 21° 1' 50.400”, E: 105°48'48.65"
+ Đ3: Soil sample taken at Cat Linh station. Coordinates: N: 21° 1' 46.602”, E: 105°49'47.009"
+ Đ4: Soil sample taken at Van Mieu station. Coordinates: N: 21° 1’38.309’’, E: 105°50’9.109”
+ Đ5: Soil sample taken at Ha Noi station. Coordinates: N: 21° 1’25.760’’, E: 105°50’36.002”
2.1.4 Sample location map
2.1.5 List of Environmental Monitoring Location.
Table 1: List of Environmental Monitoring Location
Hanoi Pilot Light Metro Project Environmental monitoring report
Doc No: HGU-IMP-TRE-WAE-L10-00015-E-1A Page 9/31
No Monitoring location Area Coordinates
Remark
N E
I Air Quality, Noise & Vibration
1 555 alley, Kim Ma street Ramp 21° 1' 46.511" 105° 48' 35.370"
Monitored
2 475 Kim Ma street, near Daewoo intersection
Station 9 21° 1' 53.269" 1050 49' 23.051"
Monitored
3 Kim Ma communal house
Shaft 21° 1' 53.379’’ 105° 49' 42.073”
Monitored
4
Cat Linh Primary school, 31A Cat Linh Street, Dong Da District, Ha Noi
Station 10 21°1’44.464’’ 105°
49’45.798” Monitored
5 Temple of Literature gate Station 11 21°1’38.698’’ 105°50’6.655” Monitored
6 Heart Hospital Station 12 21°1’24.514’’ 105°50’36.167” Monitored
II Surface Water Quality
1 Thu Le lake Ramp 21° 1' 48.316" 105°48'36.603" Monitored
2 Giang Vo lake Station 10 21° 1' 46.620" 105°49'11.558" Monitored
3 Van Mieu lake Station 11 21°01’36.880’’ 105°50’6.001” Monitored
III Ground Water Quality
Ground water quality monitoring will be conducted when tunneling work
starting Monitored
IV Soil
1 Ramp area Ramp 21° 1' 48.612" 105°48'36.025" Monitored
2 Kim Ma station Station 9 21° 1' 50.400" 105°48'48.652" Monitored
3 Cat Linh station Station 10 21° 1' 46.602" 105°49'47.009" Monitored
4 Van Mieu Station Station 11 21° 1’38.309’’ 105°50’9.109” Monitored
5 Ha Noi Station Station 12 21° 1’25.760’’ 105°50’36.002” Monitored
Hanoi Pilot Light Metro Project Environmental monitoring report
Doc No: HGU-IMP-TRE-WAE-L10-00015-E-1A Page 10/31
2.2. Parameter and monitoring frequency
Table 2: Parameter and monitoring frequency
No Parameter Location Frequency *
1. Noise
(Leq, Lmax) 6
Every three months during construction, 1 day
per each time, from 6:00AM –05:30 AM, 24
samples for each location. (3 times/ 1 sample)
2. Vibration
(V, G, F) 6
Every three months during construction, 1 day
per each time, from 6:00AM –05:30 AM, 24
samples for each location. (3 times/ 1 sample)
3
Air quality
HC, CO, SO2, NO2,
PM10 and micro climate
6
Air quality and micro - climate is measured in
one day at each position. Number of samples
are 24 per day from 6:00 AM to 5:30 AM with
frequency 1 hours measure 1 time.
4 Surface water quality
Temperature, Total ni-
trogen, Total phospho,
Crom, DO, TSS, Fe,
Mn, Cu, Hg, Cd, Zn, Ni,
As, Pb, Se, Total oil
3 Measured 2 times in day
5 Soil
Pb, Cd, Zn, As, Hg 5 Measured 1 time in day
Note:
- *: If there is no activity in a site for the last 3 months from the monitoring time, the
relevant monitoring is to be postponed
Hanoi Pilot Light Metro Project Environmental monitoring report
Doc No: HGU-IMP-TRE-WAE-L10-00015-E-1A Page 11/31
2.3. Method and monitoring equipment
Table 3: Monitoring and analysing equipment
No Equipment name Code Company/country of
production
Calibration
frequency
I Field monitoring equipment
1 Temperature, humidity kit RH 390-Extech Taiwan 1/year 2 Temperature, humidity kit Extech Taiwan 1/year
3 Temperature, humidity kit Extech Taiwan 1/year
4 Wind speed meter VWR VWR - USA 1/year
6 Noise meter Quest 2100 USA 1/year
7 Gas sampler kit SKC SKC-USA 1/year
8 Vibration meter 200M Balmac- USA 1/year
9 Multi-indicator water meter U52 Hoshiba- Japan 1/year
10 Air sampling equipment GS 312 Desega- Germany 1/year
11 Sibata dust sampler HR 1000 Sibata 1/year
12 Low flow air sampler PST 5000 Staplex 1/year
II Lab analyzing equipment 1 Turbidity meter 2100P USA 1/year
2 Water double distillation machine WSC/4D Hamilton 1/year
3 Analytical balance HR-200 USA 1/year
4 Sension 156 water parameters meas-
uring machine Sension 156 HACH-USA
1/year
5 Sample preservation cabinet VS 13023 Korea 1/year
6 ultraviolet variable spectrophotometer
DR/2400. DR/2400 HACH-USA
1/year
7 COD samples breaking kit Velp ITALIA 1/year
8 Spectrophotometer UV-VIS 2800. UVS-2800 Labomed-USA 1/year
9 Drying cabinet 53 litters UNB 400 Memmert-Germany 1/year
10 Incubator (microbiology brewing) UNB 100-500 Germany 1/year
11 Incubator (microbiology brewing) UNB 100-500 Germany 1/year
12 Ultraviolet variable
spectrophotometer DR/6000 DR/6000 HACH-USA
1/year
13 Furnace SX2 - 5 -12 China 1/year
14 Water-proof kitchen UNB Memmert-Germany 1/year
15 Water-proof shaker UNB Memmert-Germany 1/year
16 BOD incubator Biobase China 1/year
17 Protein Tester Protein Determinator KDN China 1/year
18 Atomic absorption spectrometer Analytic Jena Germany 1/year
19 Gas chromatograph Bruker USA 1/year
20 Radiometer UMF 2000 Russia 1/year
Hanoi Pilot Light Metro Project Environmental monitoring report
Doc No: HGU-IMP-TRE-WAE-L10-00015-E-1A Page 12/31
2.3.1. Noise monitoring
Using sound level meter TESTO 815, Germany. This equipment is adjusted before measuring. Noise sample take method: Noise is measured at site accordance to frequency
shown at table 1
National regulation QCVN 26:2010/BTNMT applied for noise level control
Table 4: Maximum limited value for noise at public and habitant areas
Unit: dBA
No Areas
Time
6 - 21h 21 - 6h
1 Special area 55 45
2 Normal area 70 55
2.3.2. Vibration monitoring
- Using vibration level meter model 200M, USA. This equipment is adjusted before
measuring.
- Vibration sample take method: Noise is measured at site accordance to frequency
shown at table 1.
- National regulation QCVN 27:2010/BTNMT applied for vibration level control.
Table 5: Maximum vibration limits in the environment of construction activities
Area Time Limit (m/s2)
Special area 6h - 18h 0.055
18h - 6h Baseline
Normal area 6h - 21h 0.055
21h - 6h Baseline
2.3.3. Air quality monitoring The chosen parameter of air quality monitoring is gas as CO, NO2 and SO2 and used
equipment is sucking out air machine SKC- USA. This equipment is adjusted before measuring.
QCVN 05-2013/BTNMT is used to control Air environment quality.
Equipment is used for micro – climate: TESTO 625 – Germany
Hanoi Pilot Light Metro Project Environmental monitoring report
Doc No: HGU-IMP-TRE-WAE-L10-00015-E-1A Page 13/31
Table 6: QCVN 05:2013/BTNMT table
Parameter Unit
QCVN 05:2013/BTNMT
(on the average of 1
hour)
QCVN
05:2013/BTNMT (on
the average of 24 hours)
CxHy mg/m3 5 -
CO mg/m3 30 -
SO2 mg/m3 0.35 0.125
NO2 mg/m3 0.2 0.1
PM10 mg/m3 - 0.15
2.3.4. Surface water quality
The parameter as DO was measure at sample locations by device U52 - Horiba –
Japan. The other parameters as Cr, TSS, Fe, Mn, Cu, Pb, Zn, Hg, Ni, Cd, As, Se taken
sampling, maintained and analysed at laboratory. The sensors were calibrated before
measuring.
Regulation QCVN 08-MT:2015/BTNMT, B2 type is used to control surface water in the project area. 2.4. Analysis method
Excepting noise, vibration and some parameters of surface the below parameters
were taken and analysed as the follows:
Table 7: The analysis method for environmental air quality parameters
No Parameter Analysis and measurement method
1 Hydrocarbon (CxHy) NIOSH Method 1500
2 Carbon monoxide (CO) PPNB03
3 Nitrogen dioxide (NO2) TCVN 6137: 2009
4 Sulphur dioxide (SO2) TCVN 5971:1995
5 PM10 40 CFR Part50 Method Appendix J
Table 8: The analysis method for environmental surface water
No Parameter Analysis and measurement method
1 Temperature SMEWW 2550B:2017
2 Total nitrogen SMEWW 4500-N.C:2017
3 Total phosphor SMEWW 4500-P. B&E:2017
4 Crom SMEWW 3113B:2017
5 DO TCVN 7325:2016
6 TSS SMEWW 2540 D 2017
7 Fe SMEWW 3111B:2017
8 Mn SMEWW 3111B:2017
9 Cu SMEWW 3111C:2017
10 Hg SMEWW 3112B:2017
11 Cd SMEWW 3113B:2017
12 Zn SMEWW3111B:2017
Hanoi Pilot Light Metro Project Environmental monitoring report
Doc No: HGU-IMP-TRE-WAE-L10-00015-E-1A Page 14/31
13 Ni SMEWW 3113B:2017
14 As SMEWW3114B:2017
15 Pb SMEWW 3113B:2017
16 Se SMEWW 3114B:2017
17 Total oil SMEWW 5520B:2017
Table 9: The analysis method for environmental soil
No Parameter Analysis and measurement method
1 Pb TCVN6649:2000 + SMEWW 3113B:2017
2 Cd TCVN6649:2000 + SMEWW 3113B:2017
3 Zn TCVN6649:2000 + SMEWW 3113B:2017
4 As TCVN6649:2000 + SMEWW 3111B:2017
5 Hg TCVN6649:2000 + SMEWW 3112B:2017
2.5. Position and sites for taking sample
Monitoring activities of noise, vibration and environmental air quality was meas-
ured at the same positions (detail at item 2.1). And all of monitoring positions is at habit-
ant areas that near construction area (distance from 10 – 20m).
Table 10: Brief description of monitoring site
No Location Code Type of moni-
toring
Coordinates Description
N E
I Air monitoring
1
Area of 555 alley, Kim Ma
street K1
Environmental
impact monitor-
ing
21° 1' 46.511" 105° 48'
35.370"
Spacious area, close
to roads, lots of
vehicles passing by
2
Area of 475 Kim Ma street, near Daewoo intersection
K2
Environmental
impact monitor-
ing
21° 1' 53.269" 1050 49'
23.051"
Spacious area, close
to roads, lots of ve-
hicles passing by
3 Kim Ma com-munal house
K3
Environmental
impact monitor-
ing
21° 1' 53.379’’ 105° 49'
42.073”
Spacious area, close
to roads, lots of ve-
hicles passing by
4
Area of Cat Linh Primary
school, 31A Cat Linh Street,
Dong Da District, Ha Noi
K4
Environmental
impact monitor-
ing
2101’44.464’’ 105049’45.7
98”
Spacious area, close
to roads, lots of ve-
hicles passing by
Hanoi Pilot Light Metro Project Environmental monitoring report
Doc No: HGU-IMP-TRE-WAE-L10-00015-E-1A Page 15/31
5
Area of Temple of Literature
gate
K5
Environmental
impact monitor-
ing
2101’38.698’’ 105050’6.65
5”
Spacious area, close
to roads, lots of ve-
hicles passing by
6
Area of Heart Hospital, Tran
Hung Dao street, Ha Noi
K6
Environmental
impact monitor-
ing
2101’24.514’’ 105050’36.1
67”
Spacious area, close
to roads, lots of ve-
hicles passing by
II Water monitoring
1 Surface water
of Thu Le lake NM1
Environmental
impact monitor-
ing
21° 1' 48.316" 105°48'36.6
03"
Slightly turbid water
with some residue
and mild smell
2
Surface water
of Giang Vo
lake
NM2
Environmental
impact monitor-
ing
21° 1' 46.620" 105°49'11.558"
Slightly turbid water
with some residue
and mild smell
3
Surface water
of Van Mieu
lake
NM3
Environmental
impact monitor-
ing
21°01’36.880’’ 105°50’6.001”
Slightly turbid water
with some residue
and mild smell
III Soil Monitoring
1
Soil sample taken at Ramp
area
Đ1
Environmental
impact monitor-
ing
21° 1' 48.612" 105°48'36.0
25"
Dry soil mixed with
small rocks
2
Soil sample taken at Kim Ma station
Đ2
Environmental
impact monitor-
ing
21° 1' 50.400" 105°48'48.6
52"
Dry soil mixed with
small rocks
3
Soil sample taken at Cat Linh station
Đ3
Environmental
impact monitor-
ing
21° 1' 46.602" 105°49'47.0
09"
Dry soil mixed with
small rocks
4
Soil sample taken at Van Mieu station
Đ4
Environmental
impact monitor-
ing
21° 1’38.309’’ 105°50’9.109”
Dry soil mixed with
small rocks
5
Soil sample taken at Ha Noi station/ Mẫu đất
lấy ở khu vực ga Hà Nội
Đ5
Environmental
impact monitor-
ing
21° 1’25.760’’ 105°50’36.002”
Dry soil mixed with
small rocks
The main activities of construction sites during monitoring time are in below table:
Construction Site Activities in day time Activities in day time
Ramp - D-wall excavation - Excavation B18-22, soil disposal
Station 9 - TBM assembling - No activity
Hanoi Pilot Light Metro Project Environmental monitoring report
Doc No: HGU-IMP-TRE-WAE-L10-00015-E-1A Page 16/31
Evacuation shaft - Jet grouting for column D3
- Mobilize cement
- Soil disposal
- No activity
Station 10 - Assembly rebar cage No.28
- Pouring concrete for Dwall No.15
- Soil disposal
- Housekeeping
- Casting concrete for external wall
B11(both side)
- Installing formwork for top slab
B8
- Dismantle formwork of top slab
B5
- Chipping construction joint top
slab B6
- Installing formwork of padding
concrete B12(Ls)
Station 11 - No activity - Mobilization subgrade to site for
reinstatement road
Station 12 - Transfer rebar from factory
- Curing protect concrete of top slab N4
- Housekeeping
- Rebar cage fabrication
- Soil disposal
- Drilling for jet grouting
Hanoi Pilot Light Metro Project Environmental monitoring report
Doc No: HGU-IMP-TRE-WAE-L10-00015-E-1A Page 17/31
2.6. Conditions of taking samples
Monitoring activities in April 202l carried out on 01,02/04/2021. During monitor-
ing time, conditions of climate and micro-climate are No rain and light wind.
Table 11: Sampling condition
No Code Sampling
date
Sampling
time
Weather
condition
Sampling condi-
tion
Sampling
technician
I Air monitoring
1 K1 01-
02/04/2021 06h00-05h30 No rain
Sampling when the
company operates
normally
Lê Nguyệt Minh
2 K2 01-
02/04/2021 06h00-05h30 No rain
Sampling when the
company operates
normally
Nguyễn Thị Thu Thảo
3 K3 01-
02/04/2021 06h00-05h30 No rain
Sampling when the
company operates
normally
Lê Văn Thành
4 K4 01-
02/04/2021 06h00-05h30 No rain
Sampling when the
company operates
normally
Bùi Chí Công
5 K5 01-
02/04/2021 06h00-05h30 No rain
Sampling when the
company operates
normally
Nguyễn Cảnh Thạch
6 K6 01-
02/04/2021 06h00-05h30 No rain
Sampling when the
company operates
normally
Nguyễn Hồng Hạnh
II Surface water monitoring
1 NM1.1 01/04/2021 10h50 No rain
Sampling when the
company operates
normally
Nguyễn Nam
Phương
2 NM1.2 01/04/2021 11h00 No rain
Sampling when the
company operates
normally
Nguyễn Nam
Phương
3 NM2.1 01/04/2021 15h00 No rain
Sampling when the
company operates
normally
Nguyễn Nam
Phương
4 NM2.2 01/04/2021 15h10 No rain
Sampling when the
company operates
normally
Nguyễn Nam
Phương
5 NM3.1 01/04/2021 14h20 No rain
Sampling when the
company operates
normally
Nguyễn Nam
Phương
Hanoi Pilot Light Metro Project Environmental monitoring report
Doc No: HGU-IMP-TRE-WAE-L10-00015-E-1A Page 18/31
6 NM3.2 01/04/2021 14h30 No rain
Sampling when the
company operates
normally
Nguyễn Nam
Phương
III Soil Monitoring
1 Đ1 01/04/2021 7h35 No rain
Sampling when the
company operates
normally
Nguyễn Nam
Phương
2 Đ2 01/04/2021 8h05 No rain
Sampling when the
company operates
normally
Nguyễn Nam
Phương
3 Đ3 01/04/2021 08h35 No rain
Sampling when the
company operates
normally
Nguyễn Nam
Phương
4 Đ4 01/04/2021 08h55 No rain
Sampling when the
company operates
normally
Nguyễn Nam
Phương
5 Đ5 01/04/2021 09h05 No rain
Sampling when the
company operates
normally
Nguyễn Nam
Phương