General Specification For Mechanical & Electrical Services ...

27
General Specification For Mechanical & Electrical Services June 2010 For ROYAL HOLLOWAY UNIVERSITY OF LONDON

Transcript of General Specification For Mechanical & Electrical Services ...

General Specification

For

Mechanical & Electrical Services

June 2010

For

ROYAL HOLLOWAY

UNIVERSITY OF LONDON

Page 2

Prepared For The Estates Division By:

Hulley & Kirkwood Consulting Engineers Ltd

Castle House, Horizon Centre

28-38 Upper High Street

Epsom

Surrey

KT17 4RS

(t): 01372 747047

(f): 01372 739998

(e): [email protected]

(w): www.hulley.co.uk

Author: Anthony Miller

Checked: Wayne Shipley/Anthony Miller

Approved: Anthony Miller

Page 3

AMENDMENTS

Author Date/Rev Description

Anthony Miller May 2010

Anthony Miller June 2010 Updated to incorporate various RHUL comments

Page 4

Index:

1.1 INTRODUCTION........................................................................................................................6

1.0 ENGINEERING PREAMBLES ..................................................................................................7

1.1 SCOPE AND CONTRACT.........................................................................................................7

1.2 DEFINITIONS ............................................................................................................................7

1.3 RESPONSIBILITES...................................................................................................................7

1.4 DESIGN AND CONSTRUCTION ..............................................................................................8

1.5 RELATED DOCUMENTS..........................................................................................................8

1.6 APPROVALS AND COMPLIANCE...........................................................................................8

1.7 CONTRACT INSTALLATION ...................................................................................................9

1.8 CONDITIONS AND QUALITY OF NEW MATERIALS .............................................................9

1.9 PROTECTION OF NEW MATERIALS......................................................................................9

1.10 PROTECTION OF THE WORKS ............................................................................................10

1.11 INSPECTION AND TESTS AT MANUFACTURER'S WORKS..............................................10

1.12 APPROVAL OF MATERIALS .................................................................................................11

1.13 COPY ORDERS.......................................................................................................................11

1.14 PAINTING ................................................................................................................................11

1.15 STORAGE OF MATERIALS ...................................................................................................11

1.16 ARTICLES AND MATERIALS ................................................................................................11

1.17 TOLERANCES ON COMPONENTS.......................................................................................11

1.18 FIRE .........................................................................................................................................12

1.19 WORKING PLATFORM SURFACES .....................................................................................12

1.20 ACCESS EQUIPMENT FOR INSTALLATIONS .....................................................................12

1.21 GENERAL................................................................................................................................12

1.22 QUALITY CONTROL...............................................................................................................12

1.23 REGULATIONS PUBLISHED BY THE MAIN CONTRACTOR..............................................13

Page 5

1.24 STATUTORY AND OTHER REGULATIONS .........................................................................13

1.25 ELECTRICITY SUPPLY ..........................................................................................................13

1.26 DEFINITIONS ..........................................................................................................................13

1.27 DEVIATIONS ...........................................................................................................................14

1.28 EXTENT OF WORK.................................................................................................................14

1.29 METRICATED PRODUCTS ....................................................................................................14

1.30 TEMPORARY LIGHTING AND POWER ................................................................................14

1.31 PRE-COMMISSIONING AND COMMISSIONING ..................................................................15

1.32 BUILDERS WORK AND DRAWINGS ....................................................................................16

1.33 INSTALLATION DRAWINGS, DIAGRAMS AND SCHEDULES............................................17

1.34 PROVISION OF ELECTRICAL DIAGRAMS...........................................................................17

1.35 INSTRUCTION OF EMPLOYER'S STAFF .............................................................................18

1.36 PROVISION OF RECORD DOCUMENTS ..............................................................................18

1.37 SCOPE OF RECORD DOCUMENTS......................................................................................18

1.38 RECORD DRAWINGS AND SCHEDULES ............................................................................19

1.39 OPERATING AND MAINTENANCE INSTRUCTIONS ...........................................................20

1.40 FIXED DRAWINGS IN EQUIPMENT ROOMS........................................................................21

1.41 DIMENSIONS ..........................................................................................................................21

1.42 INTERFERENCE SUPPRESSION ..........................................................................................21

APPENDICES.......................................................................................................................................22

APPENDIX 1 : PROJECT PRELIMINARIES ..........................................................................23

APPENDIX 2 : CONTRACTOR SPECIFICATION CHECKLIST ............................................25

APPENDIX 3 : PREFERRED MANUFACTURERS ................................................................27

Page 6

1.1 INTRODUCTION This Specification relates to the requirements for the supply and installation of mechanical

and electrical services at the Royal Holloway University of London, Egham.

ALL WORKS ARE TO BE INSPECTED BY THE TENDERING CONTRACTOR PRIOR TO PRICING

HEALTH AND SAFETY STATEMENT

Health and Safety precautions are required to be taken during the process of undertaking works within buildings cannot be underestimated. Reference shall be made to Royal Holloway University Health and Safety Policy and Contractors Guidance documents available from Royal Holloway University of London Estates Office. The Health and Safety Executive (HSE) publish a series of guidance documents regarding different methods of protecting the workforce and people in general when undertaking potentially dangerous work activities. Installers engaged in any work shall be registered with the Construction Skills Certificate Scheme (CSCS) and be in possession of a valid skills card.

Page 7

1.0 ENGINEERING PREAMBLES 1.1 SCOPE AND CONTRACT This Specification provides the information relating to the Employer's Requirements for the

Royal Holloway University of London. The Specification sets out the basis for design upon which the mechanical and electrical Contractors can develop the detailed design, installation and working drawings. The requirements of the Specification is to be read in conjunction with the Contractor's conditions to provide a complete mechanical and electrical installation.

1.2 DEFINITIONS Employer : Royal Holloway University of London

Estates & Facilities Department Egham Surrey TW20 0EX

1.3 RESPONSIBILITES The body or bodies employed are directly responsible for the design, supply, manufacture,

delivery, storage, installation, setting to work and commissioning the complete building services systems as required under the project. The Performance Specifications provide the basis of the Employer's Requirements permitting the Contractor (also implies his appointed Sub-Contractors) to develop the design and design drawings for approval prior to installation. The design drawings shall indicate size and provide accurate location of all builder's work requirements, including weights and sizes of all plant and equipment, size and location of all bases, plinths and size and type of any cast in fixings required. The Contractor shall mark up drawings, mark on site or provide templates as appropriate detailing the requirements.

The Performance Specifications may be supported with tender drawings which describe the

main plant and distribution philosophy for the building. If so, the Contractor shall develop the final detailed design using the main plant and distribution philosophy developed. Unless there is a change to the rationale already designed it is not intended that the detail of the main plant should require to be altered. The design parameters of the final design shall be used to verify the detail of the distribution scheme however.

The Contractors shall develop detailed design utilising the relevant Performance

Specification(s) associated with their works. The final detailed design will entail the preparations of all calculations covering the services

systems. Copies of all calculations will be submitted to the employer for comment. Installation working drawings will be developed for all systems through the production of

scheme, detailed, coordinated stage drawings. The drawings for each stage will be submitted for comment prior to progressing to the next stage.

The Contractor will liaise with the design team members or other trades as appropriate to

ensure a coordinated system is developed. To assist in the design approval process, the Contractor shall include to attend design review

meetings as called for with Royal Holloway University of London through the design period.

Page 8

Prior to ordering, technical Submittals of all plant and proprietary fittings will be submitted to the

Royal Holloway University of London for comment. Where items of equipment are visible in the final scheme, the technical submittal will be provided for the employer and engineer prior to obtaining samples for review and comment.

1.4 DESIGN AND CONSTRUCTION The Contractor shall include within his tender the costs for the development of his approved

design in order to achieve a complete and fully co-ordinated scheme. The costs shall include for liaising with all design and construction team members in the

preparation of fully co-ordinated working and shop drawings which includes all associated builder’s work.

Fully detailed technical Submissions of all equipment for review and approval shall also be

provided. The project shall be developed using AutoCAD drawing software and the Contractor shall also

develop his design in this way. 1.5 RELATED DOCUMENTS This Specification shall be read in conjunction with the Conditions of Contract and any

schedules, supplementary specifications, drawings and other documents issued with it and enumerated in the Invitation to Tender. In the event of a contradiction between this Specification and a specified requirement on any drawing becoming apparent either before or after tender, then the Contract Administrator shall be immediately informed.

The requirements of this Specification are in addition to those of the other documents listed

above. 1.6 APPROVALS AND COMPLIANCE The Contractor shall obtain and ensure approvals and compliance with the following:-

CDM Regulations Insurance Company - Test Certificates Water Authority Planning Officer Building Regulations Building Control Officer Environmental Health Officer Fire Officer Local Byelaws/Acts British Standards & Codes of Practice, i.e. Places of Entertainment CIBSE Guide BSRIA Guidelines and Technical Best Practise Royal Holloway University of London specification number 10 – Fire Alarm Specification in

respect of Fire Alarm system works of any nature

Page 9

The design proposals will require the full approval and/or agreement of Royal Holloway

University of London and their designated representatives prior to commencing the site installation works. Sectional approval of designs will be provided to ensure the site works are not unduly delayed, however it is the responsibility of the Contractor to achieve the programme requirements.

Drawing and technical Submittals will follow and ABC commenting process with comments: A Designating drawing has no comments proceed B Drawing has minor comments, integrate the comments and proceed C Drawing to be re-Submitted integrating comments Comments from the Engineer can be expected within 7 days of receipt on all drawing and

technical Submittals. The Contractors to be made aware of the finishes presentations required on all visual

equipment to be supplied within the University. The visual presentations will include a review of samples proposed for all visible equipment. Any equipment failing to meet the high standard of finish expected for this Faculty Building will be rejected and alternatives provided at no cost to the contract.

All design proposals are to be submitted for comment with supporting technical submittals for

equipment. Full calculation results forming the basis of design will be required to support all design proposals.

1.7 CONTRACT INSTALLATION The Contractor shall apply himself to the execution of the Works in a competent, informed and

diligent manner. The Contractor shall fully co-ordinate all trades and Sub-Contractors to ensure progress of the

Works as programmed by the Contractor. The Contractor shall complete the Works to the satisfaction of the Employer and demonstrate

both its satisfactory performance in accordance with the design intent and the accessibility of all services to facilitate maintenance work.

1.8 CONDITIONS AND QUALITY OF NEW MATERIALS All plant equipment and materials shall be new and the Contractor shall ensure no materials or

equipment is fitted showing any sign of corrosion, or faults or damage in any way. 1.9 PROTECTION OF NEW MATERIALS The Contractor shall provide adequate and safe storage and protection for all new materials,

plant and equipment. Pipes shall be adequately supported and stored on properly made racks to prevent bending and

distortion and the ends shall be closed and threads protected by means of caps. The storage of material, plant and equipment by laying on earth will not be permitted. Where materials cannot be stored in suitable buildings, they shall be raised clear of the ground

and protected by means of waterproof covers.

Page 10

Machined and bright surfaces shall be suitably protected throughout the works. On completion,

surfaces so protected shall be cleaned and where appropriate polished. All plant and equipment is to be left in a condition ready for painting, where painting is specified

either as part of this contract or by others. Parts liable to corrode are to be painted immediately after removal of the temporary protection.

All material, plant and equipment shall be stored under proper cover to the satisfaction of the

Employer's representative, and in such a manner that deterioration or damage does not occur. Fittings and other components shall be stored in bins or on shelves in such a way that the

Employer may conveniently check such items for adherence to the Specification, and for any interim valuation.

Materials shall be stored in such a manner so as to prevent distortion, protect any anti-corrosive

finish, flanged or screwed ends, etc. All bright and polished parts of all material and equipment shall, if liable to corrode or tarnish, be

protected by a suitable film or adhesive tape which shall be removed immediately prior to Practical Completion of the Works.

Materials, particularly metals subject to corrosion shall be suitably painted with a two part paint

system comprising of a primer and two non-metallic, top coats, where external the paint system shall be weather resistant. Materials shall not be left finished coated with red oxide paint.

Material subject to damage or deterioration due to excess exposure to ultraviolet light shall be

suitably protected. 1.10 PROTECTION OF THE WORKS All plant, equipment, materials and components shall be in perfect condition when handed over.

The Contractor shall frequently check that adequate protection is provided against rough treatment, dust, grit, frost, etc.

The Contractor shall be responsible for leaving uncompleted sections of the Contract Works in a

safe condition and shall include for any temporary works necessary to give reasonable protection from unauthorised interference. No responsibility for the protection of the Works can be accepted by the Employer until the installation is taken over.

The Contractor shall be responsible for both his and Sub-Contractors workforce protection

measures and shall protect all work areas sufficiently by means of polythene sheeting or tarpaulins as appropriate whilst conducting his work.

Appropriate costs for such items should be included within the returned cost. 1.11 INSPECTION AND TESTS AT MANUFACTURER'S WORKS The Contractors shall allow for witnessing of appropriate tests on appropriate items of plant, e.g.

air plant, chilled water plant, LV switchboards etc as deemed necessary by the Engineer/Supervising officer.

Page 11

1.12 APPROVAL OF MATERIALS The Contractors shall have the Employer's approval in writing before ordering materials

specified as to be of "agreed make". Samples of all equipment supplied as part of this contract shall be Submitted as required by the Employer. Please refer to Appendix 3 for Schedule of Preferred Manufacturers.

1.13 COPY ORDERS Should he be called upon to do so, the Contractor shall supply the Employer with copies of

orders for materials; the provision of such copy orders will not prejudice the rights of the Employer to reject the materials concerned.

1.14 PAINTING Ferrous sheet metal work not galvanised shall be finished by paint or other approved material

before despatch from works. Finished surfaces shall receive a protective covering at works before despatch. Any deterioration or damage to manufacturer's finished coating during storage and following installation shall be made good to the satisfaction of the Engineer.

The surfaces of all ferrous metal work including brackets, hangers, supports, etc. shall be

primed and finished with two coats of good quality non-metallic paint of approved colour. The Contractor shall ensure, materials shall not be left finished coated with red oxide paint.

1. that surfaces are cleaned before they are painted; 2. that those parts of the installation required to be left unpainted (e.g. finished surfaces)

shall be so left.

1.15 STORAGE OF MATERIALS The Contractor shall include within their tender for and undertake delivery, off-load, handle and

store all the materials required for the works and shall provide suitable lockfast and waterproof accommodation for all the materials Subject to deterioration or theft.

1.16 ARTICLES AND MATERIALS All articles and materials specified to conform to BS shall be clearly and indelibly marked with

the number specified, or the relevant advice/delivery notes shall include the BS number with which they are to comply.

1.17 TOLERANCES ON COMPONENTS All workmanship and materials with regard to tolerances shall comply with the relevant Codes of

Practice or British Standards. The Contractor shall be responsible for ensuring that there is an adequate exchange of

information as to the sizes of components, openings and of related positional constraints. The Contractor shall be responsible for checking dimensions of components following delivery

to site and shall draw the Employer's attention to any departure from specified manufacturing tolerances.

Page 12

The Contractor shall adjust the positions of components and/or the size of the joints within their

respective specified limits so that adverse results caused by an accumulation of individual acceptance tolerances is avoided. Where, in spite of such adjustments, adverse effects cannot be avoided, the Contractor shall immediately inform the Employer and seek his instructions.

1.18 FIRE No smoking shall take place. Any hot works can not be undertaken until a permit to work has been issued by Royal Holloway

University of London.

No fires shall be lit on the site unless they are burnt in an approved appliance. The Contractors shall not at any time light fires for the purpose of burning rubbish.

The Contractors shall take all reasonable precautions to avoid the outbreak of fire, particularly in

work involving the use of naked flames. He must impress on his workmen the dangers involved in the careless disposal of matches and cigarettes and like hazards and the accumulation of rubbish on the site.

An adequate supply of suitable fire extinguishers shall be maintained available at all work

locations at all times. 1.19 WORKING PLATFORM SURFACES The Contractor shall include full allowance for all work necessary to make the site suitable to

carry his plant while contract operations are in progress, including (if required) the provision of temporary working surfaces and all other work necessary to support the plant over the position where it is required.

1.20 ACCESS EQUIPMENT FOR INSTALLATIONS The Contractor shall include full allowance for all access equipment including scaffolding,

mobile towers, hydraulic platforms, etc to allow the installation, testing and commissioning of equipment. All access equipment must be approved by the Contractor prior to arrival on site.

1.21 GENERAL The Contractor shall be responsible for ensuring that he progressively keeps the site and the

works clean and tidy.

The Contractor shall include in his tender for the removal of all redundant and other construction debris. Failure top do so may result in contra charges where the RHUL has to dispose of construction materials

The Contractor is to Submit with his tender full details of his prefabrication proposals. 1.22 QUALITY CONTROL The Contractor shall indicate in his tender proposals the methods by which he intends to

monitor and take action with specific regard to Quality Control both `on' and `off' site. Special consideration shall be given to the exposure of services and the high quality of finishes expected.

Page 13

1.23 REGULATIONS PUBLISHED BY THE MAIN CONTRACTOR All work shall be carried out in accordance with the Main Contractor's Safety Regulations and

General Codes of Practice whilst operating on the site. 1.24 STATUTORY AND OTHER REGULATIONS The installations shall comply with all the relevant statutory instruments and regulations and in

particular with the following:- 1. The Health and Safety at Work Act 1974. 2. Regulations Under the Electricity Acts. 3. The Clean Air Act 1956 and 1968. 4. The Building Regulations 1972 et seq. 5. Disability Discrimination Act 6. The Gas Safety Regulations. 7. Any special requirements of the local Electricity, Gas or Water Undertakings. 8. The IEE Regulations for the Electrical Equipment of Buildings. 9. Energy Conservation Act 1981. 10. British Gas Council (BGC) Codes of Practice. 11. Regulations Under the Factories Act 1961. 12. CIBSE and HVAC Publications. 13. BSRIA Guidelines and Best Practice Recommendations 14. Specific Acoustic Requirements for the site to achieve Part E Compliance. The tender shall be based on the regulations current on the date of return of tenders. If these

regulations are amended or new regulations enacted after that date the Employer shall be immediately informed.

1.25 ELECTRICITY SUPPLY Unless otherwise indicated, all apparatus and wiring connected to the low voltage systems

within the Royal Holloway University of London sites shall be suitable for use with a 3 phase, 4 wire, 400V or 230V single phase 50 Hz earthed neutral system.

1.26 DEFINITIONS For the purpose of this specification the following definitions apply:-

1. Commissioning The advancement of an installation from the stage of static completion to full working

order to specified requirements. Commissioning includes the setting to work and regulation of an installation.

(a) Setting to work. The process of setting a static system into motion.

(b) Regulation. The process of adjusting the plant and equipment in a system within specified tolerances.

(c) Testing. Undertaken tests and recording results to demonstrate compliance

with specification, design and regulations.

Page 14

2. Performance Testing The evaluation of the performance of a commissioned installation.

3. Approved (and works derived therefrom) means approval in writing by the Employer unless

otherwise stated. All systems or equipment designs shall have operated successfully for not less than two years under conditions generally similar to those required by this Contract. Facilities shall be given at the tender stage, if required by the Employer to enable him to evaluate the features and performance of equipment offered in the tender. The approval of a design or piece of equipment shall be without prejudice to the site tests required after installation.

4. Size When related to plant, equipment, pipework, cables, conduit, cable tray and cable

trunking means nominal size in accordance with the recognised methods of sizing these components.

5. The words "complete installation" shall mean not only the major items of plant and

equipment conveyed by this Specification, but all the incidental sundry components necessary for the complete execution of the works and for the proper operation of the installation, with their labour charges, whether or not these sundry components are mentioned in detail in the tender documents issued in connection with the Contract.

1.27 DEVIATIONS Unless deviations are fully detailed, all things offered in the tender shall be deemed to comply

with the Specification(s) and/or Drawing(s). 1.28 EXTENT OF WORK The work shall comprise the whole of the labour, plant, equipment and, unless otherwise

indicated, all the materials necessary to form a "complete installation" including their detailed design, manufacture, works testing, supply and delivery to site, erection, setting to work and such commissioning and testing as are prescribed in subequent clauses and as may otherwise be required to give an effective working installation.

1.29 METRICATED PRODUCTS Where, due to changeover to metrication, any products and equipment required by this

specification are no longer available at the tender stage in the measurements or units stated and must or may otherwise be provided as alternative metricated or fully metricated products and equipment complying with more recent British Standards, the changes shall be declared by the Tenderer.

1.30 TEMPORARY LIGHTING AND POWER Provision for temporary lighting and power to be supplied by the Main Contractor. Temporary electrical lighting and power installations shall comply with the latest British Standard

Code of Practice for Building Site Electrification.

Page 15

1.31 PRE-COMMISSIONING AND COMMISSIONING The Contractor is required to Submit with their tender a detailed programme of all pre-

commissioning and commissioning works. The Contractor should allow for the usage of all installed plant and equipment prior to

commencement of the defects liability period during the commissioning period as shown on the construction programme including all maintenance to comply with the manufacturer's instructions and costs in connection with extending warranty/guarantee periods.

The Contractor should clearly indicate on his programme the dates when electrical power will be

available for any area. The Contractor should allow for the general use of the lighting equipment after these dates prior

to commencement of the defect liability period for the purpose of final finishes works including the cost of:-

(a) extending warranty/guarantee periods. (b) maintenance to comply with manufacturers instructions. (c) attendance by suitably qualified personnel. (d) any other associated costs in connection with this clause. The Contractor, having ensured that electricity, water, fuel and other necessary supplies are

available, shall set to work the completed Works or part thereof, at the selection of the Main Contractor and make all necessary adjustments to ensure correct functioning.

After the installation or part thereof has been set to work and adjusted the Contractor shall

demonstrate its operation, at a time selected by, and to the satisfaction of the Employer. The tests shall demonstrate, amongst other things:-

(a) the plant and equipment provided complies with the specification in all particulars and is of adequate capacity for its full rated duty.

(b) that all items of plant and equipment operate sufficiently quietly to meet the specified

requirements. (c) that all electrical circuits are properly fused and protected and conduit systems are

electrically continuous and properly earthed. The details and method of carrying out and recording the tests shall be agreed to advance with

the Employer. The representative of the Employer shall be at liberty to be present at and to participate in the tests. This shall not relieve the SContractor of his responsibilities for carrying out the tests satisfactorily.

The Contractor shall make all necessary records during the tests and, on completion thereof,

shall provide the Engineer with a test report and record, both in triplicate. The Contractor shall provide all test instruments together with skilled supervision and adequate

labour for carrying out the tests. If tests fail to demonstrate the satisfactory nature of the installation of portion thereof, then the

Employer shall decide whether such failure is due to incorrect, inadequate or defective materials, installation and/or adjustment.

Page 16

The Contractor shall, at his own expense, carry out such alterations or replacements as are

required to the Employers complete satisfaction. The Employer shall be at liberty to call for a further test when such alterations have been made and their decision as to what constitutes a satisfactory test shall be final.

The Contractor shall make due allowance for any sectional testing of the Works that may be

required and in the case of systems requiring hydraulic pressure testing, for such Subequent draining and re-filling as may be required due to ambient conditions.

If in the opinion of the Employer the tests are being unduly delayed, he may by notice in writing

call upon the Contractor to make such tests within ten days from the receipt of this notice. If the Contractor fails to make such tests within this time the Employer may himself proceed to make the tests at the risk and expense of the Contractor.

Concealed or buried work shall be inspected and tested in the presence of the Employer before

any permanent covering shall be applied. The Contractor shall give due notice in writing to the Employer when the work is ready for inspection and the Employer shall, without unreasonable delay, carry out their inspection and/or witness the tests unless they inform the Contractor in writing from time to time that they consider such inspection unnecessary but in no instance shall concealed or buried work be covered without being tested by the Employer in the manner described in the Specification.

The above general requirements as to the testing shall be read in conjunction with any

particular requirements specified elsewhere. It is important that such tests do not disrupt the Engineer's existing installation or systems and

the Contractor shall be fully responsible for any costs or consequential losses arising from any failure to ensure this.

1.32 BUILDERS WORK AND DRAWINGS The Contractor will carry out all builders work unless instructed otherwise. If applicable the Contractor shall provide all necessary information to enable the builders work to

be executed, either by the provision of drawings or schedules, or by setting out the requirements on site.

The methods to be adopted for the provision of information shall be agreed with the Main

Contractor, but in principle will be as follows:-

(a) where builders work is to be formed on site agreement shall be sought between all relevant parties prior to commencement of builders work.

(b) where access holes or panels are required for commissioning routines or post-contract

maintenance, drawings shall be provided. (c) where builders work is to be cut, it shall be marked on site.

The Contractor will be responsible for the accuracy of the information he provides and will be

liable for all costs arising from any errors in such information.

Page 17

1.33 INSTALLATION DRAWINGS, DIAGRAMS AND SCHEDULES The Contractor shall prepare, or shall cause his specialist suppliers and Sub-Contractors to

prepare all necessary drawings, diagrams and schedules for the following purposes:-

(a) to illustrate the detailed design and the arrangement of the various sections of the Works and to identify or describe the various components;

(b) to integrate the Works properly with the detail of the building and with the work of other

Trades and other services installations; (c) to furnish to other Trades such information as is the responsibility of the Contractor to

provide; (d) to locate and identify all necessary test points, access positions or other provisions for

the commissioning routines. Whilst it shall remain the responsibility of the Contractor to identify and provide full detailed

installation drawings, the following is a guide to the categories which will be required, the scale quoted being in each case the minimum:-

(a) detailed pipework layout drawings for Plant Rooms to a scale of one twentieth full size; (b) general ductwork layout drawings at a scale of one fiftieth full size; (c) general arrangement drawings of all mechanical plant and equipment showing the

positions of the equipment, and of associated motors, starters, thermostats, humidistats, temperature and humidity control units, motorised valves, motorised dampers and the like to a scale of one twentieth full size.

Four copies of each drawing, diagram or schedule shall be supplied by the Contractor.. A preliminary issue of four copies of all such drawings, diagrams and schedules shall be made

for examination by the Employer in good time for comment and revision. The detailed design will be carried out in advance of the start on site, no physical works are to commence without approved working drawings.

The Contractor shall be responsible for the accuracy of the information he provides and shall be

liable for all costs arising from any errors or delays in such information. 1.34 PROVISION OF ELECTRICAL DIAGRAMS Wiring diagrams for particular items of plant such as switchboards, generators etc. shall be

provided in respect of all electrical plant, equipment and/or systems which form part of the Works.

Such diagrams shall be fully comprehensive and shall co-ordinate the manufacturer's data in

respect of individual items of equipment so as to present, as a whole, the complete information for any interconnected group or groups of such items. They shall include, inter alia:-

(a) co-ordinated wiring/connection details between equipment and cables showing terminal

block coding, cable core size and identification;

Page 18

(b) schematic layouts presented in "ladder" or similar format such that it is possible to

comprehend the operation of a particular system, the interconnections between the various systems and to identify the components and wiring/connections shown on the co-ordinated wiring/connection diagrams.

Wiring diagrams shall be prepared by technicians having the necessary knowledge to do so

competently. The Contractor shall be responsible for the accuracy of such diagrams and shall be liable for all costs arising from any errors in them.

1.35 INSTRUCTION OF EMPLOYER'S STAFF The Contractor shall, at times to be agreed with the Employer, instruct the Employer's staff in

the use and correct operation of the works and shall satisfy himself that such staff are competent to take over the installation on completion.

1.36 PROVISION OF RECORD DOCUMENTS The Contractor shall supply to the Employer as a prerequisite to Practical Completion of Works,

comprehensive record documents in uniform indexed bound sets. The Contractor is advised that great importance will be placed upon the quality, accuracy, clarity and completeness of the record documents and upon their being made available promptly.

The Contractor shall demonstrate from time to time, as required by the Employer throughout the

execution of the Works, that adequate and accurate records are being kept such as will ensure the ultimate completeness and accuracy of the record documents and that the record documents are themselves being progressively compiled as the work on site proceeds.

1.37 SCOPE OF RECORD DOCUMENTS Record documents shall comprise, all as described in this Specification, the following:-

(a) Record Drawings and Schedules (b) Operating and Maintenance Instructions

All record documents shall be provided in three sets. In the case of drawings and diagrams the

material shall be approved plastic transparency suitable for photocopying. The record documents shall be adequate for the following purposes:-

(a) to record clearly the arrangements of the various sections of the Works as actually installed and to identify and locate all component parts thereof;

(b) to make it possible to comprehend the extent and purpose of the Works and the

method of operation thereof; (c) to set out clearly the extent to which maintenance and servicing is required and how, in

detail, it should be executed; (d) to provide sufficient and readily accessible information properly to facilitate the ordering

of spares and replacements.

Page 19

The record documents shall be correlated so that the terminology and the numerical and/or

other references used therein are consistent with and similar to those used in the physical identification of component parts of the Works.

1.38 RECORD DRAWINGS AND SCHEDULES

Please refer to the “Project Preliminaries” in Appendix 1 for further details relating to As Built system in use by Royal Holloway University of London.

The Record Drawings provided by the Contractor shall comprise the documents listed in the following paragraphs, as applicable.

These record drawings shall be produced in AutoCAD format using AutoCAD2004 software (or

later releases should these become available), the release version to be at the Employers option to suit existing working methods. The AutoCAD masters shall be produced in a competent, professional manner using best practice in the use of colours, layering and file creation methods.

Unsatisfactory AutoCAD masters will be rejected and/or redrawn by the University at the

Contractor cost. All such documents shall clearly be endorsed RECORD DRAWINGS near to the title block. Three sets of hard copy colour paper prints shall be provided. Drawings or sets of drawings to a scale consistent with that used for the Tender drawings which

shall show the "as fitted" location of the following:-

(a) the location, including level if buried, of Public Service connections incorporated in the Works, whether carried out by the Contractor or by the appropriate Authority, illustrating points or origin and termination, size and types of cables, operating voltage and/or other relevant information.

(b) the layout, location and extent of all electrical services showing all types of equipment. (c) location, identity, size and details of all apparatus served by or associated with each of

the various services. The information with respect to size and detail may be presented in schedule form Subject to the prior arrangement of the Employer.

(d) the layout, location and extent of all cable tray and cable trunking showing sizes,

changes of direction, typical sectional details including bracket arrangement. (e) the location and identity of each room or space housing electrical plant, machinery or

apparatus. Drawings or sets of drawings to a scale consistent with that used for the working drawings,

which shall show the following as installed:-

(a) the detailed general arrangement of all electrical plant spaces, including the location, identify, size and details of each piece of apparatus. The information with respect to size and detail may be presented in schedule form Subject to the prior arrangement of the Employer.

Page 20

(b) the detailed general arrangement of service Subways, trenches, ducts, switch rooms, or

other special sections of the Works where, in the opinion of the Employer, the small scale drawings cannot provide an adequate record.

Manufacturer's drawings or sets of drawings which shall show:- (a) the general arrangement and assembly of component parts of all apparatus equipment

which may require servicing. (b) the internal wiring of each piece of electrical equipment incorporated in the Works

together with physical arrangement drawings, where necessary, to locate and identify the component parts.

Comprehensive diagrams or sets of diagrams which shall show:-

(a) the principles of the arrangement and operation of each of the various services as related to central plant, other principal components and zoning of distribution, etc.

(b) the principles of application of automatic controls and instrumentation, presented in

combination with item (a) foregoing or separately as agreed with the Employer. (c) all power and control wiring including size, type of conductor used and identifying the

terminal points of each. Comprehensive schedules illustrating procedures for fault finding and for action in the event of

equipment or system failure. Comprehensive schedules of spare parts, lubricants, etc. including itemised specifications,

identification numbers and sources of supply. 1.39 OPERATING AND MAINTENANCE INSTRUCTIONS Please refer to the “Project Preliminaries” in Appendix 1 for further details relating to Operating

and Maintenance Manuals relating to As Built system in use by Royal Holloway University of London.

The general format of the Operating and Maintenance Manuals shall include:-

(a) a general description of the scope, purpose and manner of working of each system or apparatus forming part of the Works.

(b) a detailed description of the scope, purpose and manner of working of each system of

automatic controls and/or monitoring instruments. (c) data on general design parameters and associated normal operating voltages,

frequency, temperatures, etc. (d) clear and comprehensive instructions for the starting up, running and shut down of each

system or apparatus. (e) clear and comprehensive instructions for dealing with emergency conditions for each

system or apparatus. (f) instructions in respect of any precautionary measures from time to time necessary (e.g.

against corrosion or freezing).

Page 21

(g) instructions in respect of the care of apparatus normally Subject to seasonal disuse. (h) instructions as to the nature, extent and frequency of servicing necessary properly to

maintain the works in good condition and as to the materials to be used for the purpose. This information may be supported in detail, but not replaced by maintenance instructions provided by the suppliers of particular component apparatus.

(i) the names and addresses of suppliers of all major components of the Works as may

potentially be required to obtain spare parts or replacements.

A Building Logbook in the format approved by the CIBSE to their TM31 standard shall be

formulated by the Contractor and provided on handover for the client to manage. The information should also be provided in electronic format. 1.40 FIXED DRAWINGS IN EQUIPMENT ROOMS In each mechanical equipment room the Contractor is to provide and fix the following drawings

framed behind clear Perspex:-

(a) Diagrams or mechanical systems served from the equipment room with identification references for machinery and valves.

(b) Diagrams of electrical systems served from the equipment room. (c) Detailed arrangement of equipment room.

These shall make full use of colour. In each electrical plant and equipment room the Electrical Sub-Contractor is to provide and fix

the following drawings framed behind clear Perspex:-

(a) Diagrams of electrical systems served from the room. 1.41 DIMENSIONS The Contractor shall take their own dimensions from the site for the setting out of all plant and

equipment, and shall be responsible for the accuracy of those dimensions. 1.42 INTERFERENCE SUPPRESSION All equipment used by the Contractor shall be suppressed to comply with BS.800 so as to

cause no interference with radio or television. All equipment provided under this contract shall be marked with the CE label to ensure

compliance with European Standards.

Page 22

APPENDICES

Page 23

APPENDIX 1 : PROJECT PRELIMINARIES

Project Preliminaries  Operation and Maintenance Manuals  The Contractor  shall  include  in his works  for  the provision of Operation and Maintenance Manuals  through Asbuilt Ltd  Manuals  shall be prepared electrocincally and uploaded  in draft  form  to  the Universities Asbuilt  Library by Asbuilt Ltd for final approval  The Contractor shall contact Asbuilt Ltd at: Suite 14 BSS House Cheney Manor Swindon Wiltshire SN2 2PJ  Campus Site Drawing  The Contractor shall include in his works for the alteration and update of the main campus site drawing where their work involves alteration, addition or removal of some of the following:  

Roads and paths layouts 

Underground services: drainage, water, gas, electric, data, telecoms, service ducts etc. 

Existing structures 

New structures, temporary or permanent 

Ground heights and elevations 

Large trees or areas of planting 

Natural water courses and streams 

Street furniture: benches, litter bins, external lighting etc.  The  current  drawing  shall  be  altered  by  the University  Framework  Survey  provider,  details  shall  be made available to the Contractor by the Universities Project Manager  Space Alterations  The Contractor shall include in his works for the alteration and update of the building floor plans where their work involves alteration, addition or removal of some of the following:  

Walls and ceilings 

Internal services: drainage, water, gas, electric, data, telecoms, service ducts etc. 

Existing structures 

New structures, temporary or permanent   

Page 24

  The  current  drawing  shall  be  altered  by  the University  Framework  Survey  provider,  details  shall  be made available to the Contractor by the Universities Project Manager  Asset (Equipment) Changes  All significant items of plant and equipment installed at RHUL are registered on a central database and carry a bar coded registration number starting with the letter A.   The Contractor shall  include  in his works  for de registering all existing plant and equipment removed during the course of his works and on completion register all new items of plant and equipment installed during the course of his works.   A schedule of asset types to be registered, asset bar coded self adhesive labels and asset collection template sheets onto which both old  and new  assets  are  to be  registered will be provided by  the  contract projects manager.   Asset  registration  forms part of contract  record documentation and  is  required  to be completed during  the course of the works before contract completion is granted.   Hot and Cold Water Services   The  Contractor  shall  include  in  his  works  for  the  alteration  and  update  of  the  building  water  services schematic.   This shall apply to all alterations to hot and cold water services including the installation and removal of final outlets  The current schematic shall be made available to the Contractor by the Universities Legionella Manager  Asbestos  The Contractor shall note that asbestos is present in various buildings and service voids across the University Estate.   The Contractor shall refer to the Asbestos Register before commencing any work on site to satisfy themselves as to the presence of any asbestos within their work area  Should  the Contractor  come  across  any material  they  suspect  to  contain  asbestos during  their works  they MUST stop work immediately and notify the University Asbestos Manager  Access to the Asbestos register is available through the University Asbestos Manager 

Page 25

APPENDIX 2 : CONTRACTOR SPECIFICATION CHECKLIST The following documents are to be issued to the relevant Contractor prior to any works being

undertaken:

General Preambles Specification for Mechanical & Electrical Services

MECHANICAL SERVICES SPECIFICATIONS

1.0 Low Temperature Hot Water Heating Specification

2.0 Chilled Water Systems Specification

3.0 Domestic Hot and Cold Water Services Specification

4.0 Natural Gas Systems Specification

5.0 Compressed Air Systems Specification

6.0 Chemical Cleaning and Flushing of Water Systems Specification

7.0 Ductwork Systems Specification

8.0 Refrigerant Pipework Systems Specification

9.0 Above Ground Soil, Waste and Vent Pipes Specification

10.0 Operating and Maintenance Manuals Specification

11.0 Thermal Insulation Specification

12.0 Inspection Testing and Commissioning Specification

Page 26

ELECTRICAL SERVICES SPECIFICATIONS

1.0 Low Voltage Distribution Systems Specification

2.0 Cable Construction and Installation Specification

3.0 Conduit and Cable Trunking Installations Specification

4.0 Cable Tray Installation Specification

5.0 Lighting Installation Specification

6.0 Emergency Lighting Specification

7.0 Power Installation Specification

8.0 Data Communication Cabling Requirements Specification

9.0 Electrical for Mechanical Services Specification

10.0 Fire Alarm Installation Specification

11.0 Television Installation Specification

12.0 Uninterruptible Power Supply Installation Specification

13.0 Earthing Specification

14.0 Testing and Commissioning Specification

15.0 Operating and Maintenance Manuals Specification

Page 27

APPENDIX 3 : PREFERRED MANUFACTURERS All components are to comply with the relevant British, European Standards and to be CE stamped as appropriate. The manufacturer of all intended equipment to be supplied, is to be Submitted at the time of tender for agreement by the Royal Holloway University of London Electrical Mains LV Panels Carville Switchgear Sub-Distribution MEM Final Circuit Boards Crabtree or MK Sockets, Switches, etc. MK Lighting Thorn, Philips, Osram BMS Trend Fire Alarm Morley AIS Fire Alarm Filed Devices Apollo XP95 Fan (Domestic) Vent Axia, Xpelair Showers Triton Access Control NT Security Mechanical Pumps Grundfos Boiler (Domestic) Ideal Boiler (Commercial) Hamworthy DX Air Conditioning Daikin Radiator TRV Drayton Valves (general) Hattersley, Crane Sanitary Fittings Armitage Shanks, Twyford Taps & Outlets Peglar Showers Mira