Transcript of Faisal action plan level 300
ContentsCHAPTER ONE..........................................................21.1 General introduction............................................21.2 OBJECTIVES......................................................21.3 METHODOLOGY.....................................................21.4 SCOPE...........................................................31.4.1 Geographical Scope..........................................31.4.2 Contextual Scope............................................3
CHAPTER TWO..........................................................42.1 Introduction....................................................42.2. Background of the problem......................................42.3 Project area....................................................42.3.1 Location and Size.............................................42.3.2 Climate and Vegetation........................................52.4 Justification of the problem....................................52.5 PROJECT GOAL....................................................72.6 Project objective...............................................72.7 Project Activity................................................7
CHAPTER THREE........................................................93.1 Implementation Strategy.........................................93.1.1 LOGICAL FRAMEWORK.............................................93.1.2 Activity planning matrix.....................................123.1.3 Stakeholder Analysis.........................................133.1.4 Cost Analysis of Project.....................................16
CHAPTER FOUR........................................................184.1 Monitoring and Evaluation......................................184.2 Project Sustainability.........................................184.3 Expected Benefits..............................................19
CHAPTER FIVE........................................................205.1 Conclusion.....................................................20
1
CHAPTER ONE1.1 General introductionPlanning which is a problem solving process is concerned with the
continuous and diagnostic study of a situation to realize the
kind of society we wish to see. It employs various instruments in
its analysis in coming out with what is called the plan document.
Among these is the action plan, which is a project design
methodology. In practice planning is most frequently used to
tackle perceived problems by making appropriate interventions
aimed at ensuring a positive and sustainable development that
will enhance people‘s opportunity for an improved standard of
living.
The action plan or annual plan is intended to enhance the
achievement of the objectives of the Local Plan for the afore
prepared medium term plan and it details out the project dubbed
“providing in-service training to 200 people in pito brewery. The
action plan according to the guidelines of the GSGDA II provides
the essential steps for ease of implementation, monitoring and
evaluation and consists of the project cost.
1.2 OBJECTIVESThe objectives of this assignment include the following:
- To expose students to the rudiments of project planning andimplementation
- To enable students understand the basic knowledge ofresources, institutions and timing needed for projectimplementation.
1.3 METHODOLOGYAmong other things, the Action Plan must contain the following;
3
1) The nature of the problem to be addressed/Background to theProject
2) Justification of the Project3) The Project goal/objectives4) Description of the Project5) Project Activities6) The Project Planning Matrix (The Log frame)7) Detailed Implementation Schedule8) Project Budget (Detailed Cost Analysis)9) Stakeholder Analysis10) Monitoring and Evaluation Arrangements11) Project Sustainability/Post Implementation Management
Arrangements12) Expected Project Benefits
1.4 SCOPE1.4.1 Geographical Scope The Wa West District is one of the eleven districts that make up
the Upper West Region created in 2004 by legislative instrument
1751. The District is located in the western part of the Upper
West Region, approximately between Longitudes 9º40’N and 10º10’N
and also between latitudes 2º20W and 2º50’W.
1.4.2 Contextual Scope The assignment, preparation of an action plan focuses on the
preparation of action plan on providing an in-service training to
200 people in the pito brewery industry as an intervention to
improve upon the standards of living of the people in the
district.
4
CHAPTER TWO2.1 IntroductionThis chapter talks in details the project background, the projectdescription and its area of implementation among others.
5
2.2. Background of the problemIn Ghana industries play a major role in economic development.
Industries have enormous contribution to Ghana economy.
Industries in Ghana employ a lot of people thereby reducing the
unemployment rate in Ghana. Again industries contribute to
increase in GDP and per capita income of individuals. In view of
the above contributions of industries it is therefore important
that special policies are designed geared towards developing
industries in Ghana. In line with the above is the reason why?
Efforts are being made to address problems confronting industries
in Ghana most especially in the rural areas. As a case in most
Ghanaian districts, the wa west district of which I am currently
studing it is faced with a problem of low industrial
productivity, production under capacity due to over dependence on
traditional and out of date methods and techniques in production
and lack of modern inputs and adequate productive skills to
operate their local industries. This therefore saw the need for
training workshops to be organized in the district to equip local
industry operators more specifically, the pito brewery sector of
the local industry with adequate productive skills as part of the
strategies to expand and increase productivity of local
industries in the district.
It is in this regard that this document has been prepared to
address the above stated problems with regards to local
industries in the wa west district within a period of one year.
6
2.3 Project areaEvery project has a geographical or spatial menisfesatation and
this project of providing in-service training to 200 people is
not an exception to this basic requirement in project
implementation and so the location and size of the district of
which it is going to be rooled out has been carefully curved out.
2.3.1 Location and SizeThe Wa West District is one of the eleven districts that make up
the Upper West Region created in 2004 by legislative instrument
1751. The District is located in the south-western part of the
Upper West Region, approximately between Longitudes 9º40’N and
10º10’N and also between latitudes 2º20W and 2º50’W. It shares
borders to the south with Northern Region, North-West by Nadowli-
Kaleo District, East by Wa Municipal and to the West by Burkina
Faso. The total land area of the district is approximately 1,856
square km. This constitutes about 10 % of the region’s total land
area, which is estimated at 18,478square km.
2.3.2 Climate and VegetationThe Wa West District lies within the Guinea Savannah Zone which is
mainly characterized by short grasses and only few woody shrubs and
trees. Common trees in the District consist of drought and fire
resistant trees such as baobab, dawadawa, shea trees and kapok.
Commercial tress such as Cashew and Mangoes are also found in the
district. The vegetation is very suitable for livestock production,
which contributes significantly to household incomes in the District.
The greatest influence on the vegetation is the prolonged dry season.
During this period, the grass becomes dry and the subsequent bush
7
burning leaves the area patched and mostly bare of vegetation.
Consequently, the torrential early rains cause soil erosion. Bush
burning reduces the vegetative cover and adversely affects rainfall.
Transpiration is reduced considerably and this affects average annual
rainfall totals.
The climate of the district is tropical continental type with the mean
annual temperature ranging between 22.5°C to 45°C. A lesser known and
used environmental resource is what is referred to as diurnal
temperature variation. The Wa West District, like most of the other
districts of the three northern regions have the comparative advantage
during the months of November to February (the harmattan period) of
having relatively cool night temperatures of between 18°C to 22°C and
rather hot day temperatures of as high as 38°C to 40°C. The
relatively cool nights are very suitable for stimulating good
flowering in fruits and vegetables, heavy fruit setting and good
ripening and color turning in fruits. This gives the northern part of
Ghana that comparative advantage of this type of less known climatic
resource for generating other economic benefits; and Wa West District
should not hesitate to take full advantage of this. The period between
February and April is the hottest. Between April and October, the
Tropical Maritime air mass blows over the area which gives the only
wet season in the year; with the suitable rainfall for agriculture
being effectively only four to month in a year. The poor rainfall
pattern leads to the migration of the youth, a factor associated with
the underdevelopment of the human resource base of the district.
8
2.4 Justification of the problemIn the context of rural areas and Ghana at large it is absolutely
fundamental that local industries play a major role in the
development of the national economy and serve as an employment
for most of the rural folks and must therefore be treated with
contempt and that is why several governments have made attempts
to develop rural/local industries through formulation of several
policy frameworks to deal with development of local industries.
Provision of adequate productive skills to industry operator in
the rural communities is a call in the right direction because
with adequate productive skills both men and women will be
willing/ready to take up productive responsibilities which will
be an essential move for achieving gender equity/equality
(freeing women and girls from being subordinators’ of their
husbands but rather make them responsible wives and girls),
sustainable development and poverty alleviation. Having
productive skills will enhance the standard of living of people
and motivate them be risk bearers (entrepreneurs) perhaps the
absence of which Africa and Ghana at large is not developing.
Availability of this will reduce the rate of poverty as well as
dependency rate. Thus organize training workshops allows for both
men and women to have access to adequate skills and equipments
necessary for the operation in local industries allowing them to
be able to engage in effective operation of industries thereby
leading to the expansion of local industries in wa west hence
increase productivity and income generation. There is the need
for organized training workshops to be provided within set goal9
and objectives to enable the people have access to adequate
productive skills in the district. The pito industry in the
district is the second largest in the local industry and its
development is very necessary as it forms the basis for enhancing
and promoting made in Ghana product and as well as conserving the
indigenous culture of the people in the district. The provision
of in-service training to this 200 people in the pito industry
very necessary.
The pie chart below shows the number people in the pito business
of the industry and goes to justify the project been tracked
Number of people employed
Pito breweryPotteryWeavingSheanuts processing
Form the above pie chart, it is very clear that people employed
in the pito brewery are second to the people I n the shea butter
10
processing business and given the potential of the sector in the
area of market and raw material availability in the district it
is very wise to conclude that the sector of pito brewery has more
room to improve and hence the idea of these project to ensure
that those in the sector learn to adopt to the modern way of
production and increase their productivity
2.5 PROJECT GOAL
The project is curved out of a broader goal identified under thenational thematic are of Ensuring and Sustaining MacroeconomicStability and this called is to increase industrial productionand productivity of the district.
2.6 Project objective
Having identified the project goal and the thematic areas of theproject, the following are the objectives of the goal and it isin the realization of this objectives that, the project isexpected to be implemented “To increase the number of peopleemployed in the local industry from the current 42% to 70% by theend of 2017”
2.7 Project Activity
Although the pito brewery operators have some skills, they are
still not considered as adequate enough to ensure effective and
efficient operation of the industry and to compete with the ever
increase foreign drinks into the local market. The project is to
provide 200 people who are engage in pito brewery of local
industry with adequate productive skills which would be more11
appropriate and more realistic for operation and for competition
in the market locally.
The training is to be done entirely by LESDEP in collaboration
with wa west district, ACTION AID GHANA and NBSSI. For each of
the training sessions which are going to be organized in Ga and
Dorimon and this will made possible by liaising with various
zonal councils to provide 50 people in each of the four zonal
council of the district for a 2 weeks intensive and practically
oriented training. After the training workshops have been
organized, the brewery operators need to embark on serious
operation using the skills acquired in to achieve a sustained
expansion of local industries and increased productivity.
There will be monitoring and evaluation throughout the project
the period carried out by the various institutions responsible
the implementation maintenance of the proposed project.
12
CHAPTER THREE3.1 Implementation StrategyThe implementation strategy is the procedure adopted to help
achieve the set up project or activity. This chapter involves the
identification of various sub tasks or sub-activities associated
with the project or activity and preparation of the
implementation schedule. This chapter contains the strategies and
implementation models to implement the activity. This is a follow
up to the problems, goals and objectives as well as the chosen
alternative course of action outlined in chapter two. These will
throw more light on the mechanism for restructuring the project,
logical framework, time activity matrix, and role of stakeholder
analysis, sources of funds, institutional frame work and the
costing of the project.
3.1.1 LOGICAL FRAMEWORKOnce a project has been identified and detailed information has
been collected, we can start to plan how the project would
function. A very essential way of planning how the project would
13
function is through the use of the logical framework. The log
frame helps us to think through critically all the factors that
should be considered for a successful project.
The log frame is a tool that helps to strengthen project design,
implementation, management and evaluation. Even though the log
frame is normally constructed during the planning stages of a
project, it is a living document that must be consulted at all
stages of the project and could be updated.
The log frame summarizes the whole project. It is a matrix with
rows and columns indicating the goal of the project, the
purpose/objectives, the expected outputs and inputs/activities
vertically in a column and the objectively verifiable indicators,
means of verification or evidence and major project assumptions
horizontally in a row.
TABLE 3.1 Showing the logical framework of the project
NARRATIVE SUMMARY OBJECTIVELY
VARIABLE
INDICATORS
MEANS OF
VARIFICATION
IMPORTANT
ASSUMPTIONS
14
PROJECT GOAL
PROJECT PURPOSE
Increase production of the
pito brewers in the
district
1. Increased in
production
2. Improved
packaging of
products
PROJECT OUTPUT
1. Pito brewer trained
2. Pito brewers used new
techniques
20 pito
Brewers
trained
98% of those
trained use
new brewery
techniques
and
technology
Project
reports
surveys
Availability of
training
materials
Brewers willing
to learn and
accept the new
techniques
PROJECT ACTIVITIES
1. organizing stakeholder
meeting
2. Public awareness
creation
3. Formation of project
INPUTS
1. finance
2. Resource personals
3. stationary
4. Selected pito brewers
1. pito brewers
will be willing
to accept the
new techniques
and technology
2. Availability
15
team
4. Selection of site and
accommodation for
participants
5. Actual training on pito
brewery techniques
6. Awarding of
certification for
participation
7. monitoring
8. Evaluation
of resource
persons
16
3.1.2 Activity planning matrixThe activity planning matrix is a planning implementation tool that reveals in details the
various activities and their responsible persons as well as the time that those activities
will be implemented, the expected output requirement of the activity as well as the means
of verification of the expected indicators. This matrix simplifies the activities and help
track those responsible for what and when. This help to ensure ease of accountability and
monitoring of the various planned activity.
Table 3.2 showing the detailed Activity planning Matrix for the project
ACTIVITY OBJECTIVELY VERIFIABLE INDICATORS
MEANS OF VERIFICATION
TIME FRAME INPUTS OUTPUT RESPONSIBLILITIES
1. stakeholdermeeting on participants selection criteria
Meeting held Personal observation
April 2015 Funds Participation selection criteria identified
LESDEP
2. Publicawarenesscreation
Publicawareness made
Personalobservation
June 2015 Finance Resource Personnel Educationaland communication materials
Stakeholdersinformed 75%of the district members educated
District information unit
18
3. formation of project team
Project team formed
Personal observation
july 2015 Finance (Donor)
The projectteam isformed
District Assembly
4. selection of site and accommodation for participants
Site for training and place for accommodation for 200 people selected
Interview July- September 2015
funding Selected training site and accomdation
Project team and traditional Authority
5. selection of participants
200 participants,50each of the 4 zonal councils selected
Interview Sept- November 2015
funding 200 participantsselected
Project team
6. actual training on pito brewery techniques
200 pito brewers trained
Project report December 2015
Funds, stationary
200 pito brewers trained
Project team
7. Awarding of certificatefor participation
200 certificateaward to all 200 participants
Personal observation
Project report
December 2015
funds 200 pito brewers awarded withcertificate
Project team
7. Monitoring All activities monitored
Monitoring report
From Aprilto December
Resource Personals and funding
Monitoring report
Project management team and district assembly
8. evaluation Impact of project scouted
Evaluation report
3 years after
Resource Personals
Evaluation report
Project management
19
project implementation
and funding team and district assembly
3.1.3 Stakeholder AnalysisA stakeholder is any person or organization, who can be positively or negatively impacted
by, or cause an impact on the actions of a company, government, or organization.
Stakeholder analysis is the process of identifying the individuals or groups that are
likely to affect or be affected by a proposed action, and sorting them according to their
impact on the action and the impact the action will have on them. This information is used
to assess how the interests of those stakeholders should be addressed in a project plan,
policy, program, or other action. Stakeholder analysis is a key part of stakeholder
management.
Table 3.3 showing the stakeholders and their level of impact and interest in the project
Stakeholders Interest Likely impact on
project
Priority
Women Increase income + 2
20
Men Increase income + 2Children Parent can provide
them their needs
+ 1
LESDEP Helping to improve
the skills of local
people
+ 2
District Assembly Improve the living
standard of their
people
+ 2
NBSSI Assisting small
scale industries to
grow
+ 2
Table 3.4 Sources of fund
This table outlines the various funding agencies for the project
Source Amount( GH₵) Percentage (%)LESDEP 1136.50 10
21
3.1.4 Cost Analysis of ProjectThis section deals with estimation of total cost of the project.
Costing is very important in planning of the project since every
project comes with either time or cost elements which need to be
accounted for in order to ensure enough budgetary allocation for
the project as well as to avoid wrong estimation that will waste
resources. Then plan has been estimated to cost GH₵11365. This is
illustrated in the table below.
Table 3.4 .Cost Analysis of the Project
ITEM DESCRIPTION QUANTITY UNIT PRICE
(GH ȼ)
TOTAL (GH ȼ )
1. Dissemination of
information
2 150 300.00
2. erecting of canopies 2 100 200.003. Mobilization of funds
and logistics
2 500 1000.00
4. Actual training of
industry operators
3(sessions) 1000 3000.00
5. Public address system 3(times) 100 300.006. Provision of
refreshment(item13)
3(times) 150.00 450.00
7. printing of
certificates
17 5.00 85.00
8. Award of contract 2(sessions) 2000.00 4000.009. Formulation of
project teams
2(teams) 300.00 600.00
23
10. Conduction of field
surveys
6(months) 50.00 300.00
11. Monitoring and
evaluation
12(months) 100.00 1200.00
Prepare and
submission of report
2 100.00 200.00
24
CHAPTER FOUR
4.1 Monitoring and EvaluationThe purpose of monitoring is to take corrective action, thus if
there is disparity, there can be amendment. One of the critical
steps in preparing the monitoring and evaluation plan is defining
the most appropriate indicators and targets that are achievable
and directly related to the District Medium Term Development Plan
Goals and Objectives. National Development Planning Commission in
collaboration with the ministries, departments and agencies,
regional planning co-ordination unit, district assemblies and
district partners will define some core indicators to be
monitored in all districts. All these form part of the monitoring
and evaluation plan and their indicators. In the context of this
assignment, the institutions or agencies responsible for
monitoring the project are the District Assembly and project
team.
Evaluation is measuring the action or what’s done against the
objectives. It forms part of the evaluation prepared by the
district using the monitoring and evaluation guidelines under the
Ghana Shared Development Agenda II. Evaluation is done externally
and internally with the notion of independent, self-evaluation
and joint evaluation. It should be independent, transparent, non-
ethical, impartial, timely and relevant. Like the monitoring, the
District Assembly and Project team are responsible for evaluation
of the activity.
25
4.2 Project SustainabilityWith the long term focus of the project aimed at improving living
standards, it needs to be sustained for a long period of time.
There is the need to devise strategies to ensure the sustenance
of the project. To ensure the activities sustainability, there is
the need for a routine follow up on the pito brewers trained to
track work down and give financial support if necessary. Progress
of work will be reported back to the Implementation agencies to
offer support if needed.
4.3 Expected BenefitsThese are various benefits to be derived from the implementation
of the activity to its final output. This is diagrammatically
illustration below:
Figure 3: Expected Benefits of the Activity
26
Increase capacity ofbrewers
Improve Quality of goods and services produced
Increase access
CHAPTER FIVE5.1 ConclusionAn empowered industry sector can serve as an engine of growth for
a country’s development. Action Plans are essential components of
development planning as such must be given the necessary
importance if long term goals of the district especially the
medium term plan are to be achieved. Industry activities found
in the district and not only the brewery sector must be given the
necessary support to ensure efficient production. This in
27
Increase in High standard of
collaboration with agriculture which is the backbone of the
district can improve the well-being of its members. It should benoted that as problems are bound to arise, there should be
consistent monitoring to find strategies and formulate policies
to solve developmental problems as they crop up.
5.2 RecommendationProject implementation has been a challenge in the context of the
Ghanaian economy as far as development is concerned. Project
implementation in our country is constrained by the weak
institutional and regulatory framework coupled with the
insufficient human resource and capital inadequacies. Hence, it
is recommended that
All stakeholders involved should make effective and
efficient use of resources.
Proper management of the project should be taken into
consideration as well as the cost and its socio- economic
impacts of the project on the district, region and the
nation as a whole.
28