due process - JIGAWA STATE GOVERNMENT

193
JIGAWA STATE GOVERNMENT DUE PROCESS AND PROJECT MONITORING BUREAU OFFICE OF THE EXECUTIVE GOVERNOR END OF YEAR PROJECTS REPORT JANUARY TO DECEMBER, 2019 WEB: WWW.JIGAWADUEPROCESS.COM EMAIL: [email protected]

Transcript of due process - JIGAWA STATE GOVERNMENT

JIGAWA STATE GOVERNMENT

DUE PROCESS AND PROJECT MONITORING BUREAU

OFFICE OF THE EXECUTIVE GOVERNOR

END OF YEAR PROJECTS REPORT

JANUARY TO DECEMBER, 2019

WEB: WWW.JIGAWADUEPROCESS.COM

EMAIL: [email protected]

CONTENTS

SECTION (A) - EXECUTIVE SUMMARY

SECTION (B) - CHARTS

SECTION (C) - PRE-CONTRACTS EVALUATIONS JANUARY TO DECEMBER, 2019

SECTION (D) - CONTRACTS AWARDED JANUARY TO DECEMBER, 2019

SECTION (E) - COMPLETED PROJECTS

SECTION (F) - ON-GOING PROJECTS

- MINISTRY OF HEALTH - MINISTRY OF WATER RESOURCES - MINISTRY OF WORKS AND TRANSPORT - MINISTRY OF EDUCATION, SCIENCE & TECHNOLOGY - MINISTRY OF LAND AND HOUSING - MINISTRY OF COMMERCE - DUTSE CAPITAL DEVELOPMENT AUTHORITY - CABINET OFFICE - MINISTRY OF INFORMATION - JIGAWA SATTE POLYTECHNIC, DUTSE - MINISTRY OF FINANCE AND ECONOMIC PLANNING - JIGAWA STATE COLLEGE OF ISLAMIC & LEGAL STUDIES, RINGIM - BINYAMINU USMAN POLYTECHNIC, HADEJIA - MINISTRY OF ENVIRONMENT - JIGAWA STATE INFORMATICS INSTITUTE, KAZAURE - GOVERNMENT HOUSE - DIRECTORATE OF EONOMIC EMPOWEERMENT - DEPUTY GOVERNOR’S OFFICE

EXECUTIVE SUMMARY.

The 2019 Budget termed “Budget for Sustained Economic Growth and Social Transformation 11” was conceived to sustain the

momentum of progress towards the attainment of medium-term objective of creating a self-sustaining local economy that fully

leverages on productive potentials of the state. Also to continuously improve access to, and quality of, public service delivery

particularly in the basic social services sectors including social protection.

In view of the above statement from year 2019 budget speech by His Excellency the Governor, the Bureau as an organ responsible for

monitoring the implementation of capital projects hereby present its end of year report.

The end of year 2019 report consists of four sections only: Pre-contract Evaluations, Contracts Awarded, Completed Projects and

Ongoing Projects report.

PRE-CONTRACT EVALUATIONS.

As at the end of reporting period, projects worth N14,727,910,392.66 only were submitted for vetting out of which the Bureau

recommended N14,520,849,570.67 only for execution thereby saving N207,060,821.99 only (1.4%) in favor of the government. This

portrays a positive response by government agencies in terms of adequate costing of their projects in line with due process guidelines.

Furthermore, this became possible as a result of timely production of the price list data book and compliance with its content by some

government agencies accordingly. Though, training on use of procurement planning template has been conducted in the state by State

Partnership for Accountability, Responsiveness and Capability (SPARC), however most MDAs are yet to put it to use adequately there

by reducing the compliance level of the procurement exercise. It should be noted that this document is expected to be part of budget

process requirement as well as procurement process respectively.

CONTRACTS AWARDED.

A total of N73.970 billion was budgeted for capital expenditure, both for on-going projects and new ones, representing 47% of the

total budget of N157.540 billion in the year 2019. Currently, contracts worth N13.231 billion only were awarded, representing 17.88%

of the capital provision. Though it is the practice of the current administration to implement most of the capital intensive projects by

means of “Open Tender” process, in 2019 only 71.88% were awarded through that process against the bench mark of 80% as per best

practice. It is worth noting that the projects awarded by the open tender process, last year (2018), stand at 93% only. While projects

awarded above threshold of N100million, by open competitive process, represent 58.69% only this year against 97% in the previous

year 2018. This might not be unconnected with the additional works awarded on some mega ongoing projects in the state, to satisfy

the aspirations of the communities in which the projects were sited. Namely it includes some roads projects in Hadejia township,

Babura township, Jigawar Danalli, and two hospitals projects in Hadejia and Birnin Kudu .

Total Contracts Awarded in 2019;

-Contracts Awarded by Open Competitive Bidding = N9,510,649,219.70 (71.88%)

-Contracts Awarded by Selective Bidding Process = N2,942,639,760.80 (22.24%)

- Contracts Awarded by Nominative Bidding Process = N 778,255,567.58 (5.88%)

Total = N13,231,544,548.08 (100%)

Contracts Awarded Above Threshold of N100million in 2019;

-Contracts Awarded above Threshold (N100 m), by Open Competition = N3,451,823,705.52 (58.69%)

-Contracts Awarded above Threshold (N100m), by other method =N 2,429,581,418.90 (41.31%)

Total =N 5,881,405,124.42 (100%).

POST CONTRACT EVALUATION.

Projects with contract value of N123,576,349,031.75 billion were being reported under this section. Most of the projects, at various

stages of completion, were being carried forward from the previous years. It is anticipated that about half of all the on-going projects

will be completed by the end of this year if there is stability in capital receipt from the federation account. The only exception that will

be carried to preceding years include, among others, Eastern bye pass road i.e western bye pass road i.e. Maigatari-Galadi-Diginsa-

Birniwa road, and others awarded at the end of previous year 2019. While Jigawa University project ,B/kudu new general Hospital,

Guri, Garki, Gantsa General hospitals, and Hadejia and Kazaure Specialist Hospitals, will also spill to next year accordingly.

• COMPLETED PROJECTS; This section contains projects that are 100% completed worth N38,803,305,043.60 only, 30.89% of the

N123.576 billion projects being reported on. It is worth noting that the percentage achieved is low despite the declaration by

government that most of the projects will be completed within the year. This is mainly due to paucity of funds from the

federation account.

• ON-GOING PROJECTS; The value of on-going projects being reported under this section amounts to N84,773,043,988.15 only

(69.11%) of the total under consideration. The figure is staggering and could not be provided for in next year’s budget (2020)

to actualize the completion of all on-going projects but rather a percentage of it.

OBSERVATIONS.

It has been observed that there is a lot of improvement by government agencies, to date, in packaging their capital projects for vetting

by the Bureau as highlighted in the pre -contract evaluation process whereby 7.3% was saved from vetting exercise within the period.

This is largely due to adoption of the revised rates being produced regularly by the Bureau in conjunction with the MDAs of

government. Despite this positive trend, absence of a comprehensive procurement plan by MDA’S, reduces the chances of optimum

participation by contractors in all bidding process in terms of adequate preparation and also reduce the attainment of full compliance

with the existing procurement law.

It was observed that only 72% of contracts awarded by government, this year, followed open competitive tender processes which

need to improve in line with best practice, above 80%, to be abreast with donor agencies requirement.

The law provision which requires that for all contracts the value of which is above N10.00 million a performance bank guarantee must

be presented is yet to take effect despite several reminders forwarded by the Bureau to government.

The use of Standard Bidding Document (SBD) by agencies during tender process is yet to be complied with in full despite extensive

training conducted by SPARC and emphasis made by the Bureau, to achieve compliance with best practice as provided by law.

Many contracts awarded from the previous year are yet to make meaningful progress due to nonpayment of contractual obligations

by government, caused by reduction in capital receipt from the federation account.

CONCLUSION/RECOMMENDATION.

Government agencies are advice to prepare a comprehensive procurement plan for all the proposed capital projects, approved within

the budget, and forward it to the budget department and the Bureau so as to achieve full compliance of the procurement law which

will allow every contractor to get prepared for bidding in good time.

The use of relevant tender processes, as prescribed by law, should always be considered for the award of contracts for works, goods

and services, except in special circumstances where the government direct otherwise, such that the maximum benefit of the system

could be harnessed.

The law provision which mandate the presentation of performance bank guarantee by prospective contractors should be activated in

the council award letter so as to scare unserious contractors in participating in government business.

All contracts bidding process should be carried out as per Standard Bidding Documented (SBD) presented to each MDA in line with

best practice as per law compliance.

Government should set up a Committee to advice on how to generate more revenue and reduce the dependency of capital receipt

from the federation account so as to meet the state contractual obligations.

……………………………………… …………………………………… Alh. Garba Halilu Sara Ado Hussaini MON

Special Adviser. Director General.

SECTION ( B )

CHARTS

JANUARY TO DECEMBER, 2019

PROJECTS BEING EXECUTED BY MINISTRIES/AGENCIESJANUARY-DECEMBER, 2019

ENVIRONMENT FINANCE JS POLY TECHNIC INFORMATION COMMERCE ECONOMIC EMPOWERMENT

68,210,461,519.59

4,587,643,851.15

20,100,894,380.81

15,008,150,836.44

9,653,818,005.82

966,545,560.70 2,926,246,754.80

WORKS &TRANSPORT

WATERRESOURCES

DCDA EDUCATION HEALTH LAND & HOUSING CABINET OFFICE

PROJECTS BEING EXECUTED BY MINISTRIES/AGENCIESJANUARY-DECEMBER, 2019

WORKS & TRANSPORT WATER RESOURCES DCDA EDUCATION

HEALTH LAND & HOUSING CABINET OFFICE

204,170,069.67

60,705,065.40

91,672,274.72

209,433,611.20 194,446,776.65

PROJECTS BEING EXECUTED BY MINISTRIES/AGENCIESJANUARY-DECEMBER, 2019

JSCI &LS Ringim Deputy Governor's Office BU Poly Hadejia Govt. House INFORMATIC Kazaure

Completed, 38,803,305,043.60 ,

31%

On-going, 84,773,043,988.15 ,

69%

ANALYSIS OF PROJECTS PERFORMANCE JANUARY-DECEMBER, 2019

Completed On-going

SECTION ( C )

PRE-CONTRACT EVALUATION

JANUARY TO DECEMBER, 2019

S/N PROJECT IN PROCESS QUOTED SUM DPPM RECOMMENDED SAVING/ REMARKS

(N) COST (N) INCREASE

MINISTRY OF HEALTH

1

Proposed Procurement of Beds, Mattresses and Classroom Arm Chairs and Grass Cutting Machines

for School 0f Nursing Hadejia. (Revised Scope) 5,328,125.00 5,145,656.25 182,468.75 Min of Health

2 Proposed Renovation works At JIMSO Regional Store Hadejia (Flooding) 11,178,829.58 10,890,818.56 288,011.02 Min of Health

3

Proposed Construction of 1No Basic Health Clinic at Wurno (2019 Second Quarter Constituency

project) 17,484,899.82 17,484,899.82 - Min of Health

4

Proposed Construction of Basic Health Center/ Health Clinic in 5No. Constituency Across the State

(2019 Constituency project) (bulangu, Kiyawa, Garki, Taura & Dutse) 47,584,342.74 48,333,671.42 (749,328.68) Min of Health

5

Renovation of Male Students Hostel Block D & E old ICT and Security Wire at School of Health

Techonology Jahun 33,809,059.99 34,156,207.55 (347,147.56) Min of Health

6

Proposed Renov. of Female Student Hostel Storey and New Hostel Block at School of Health

Technology Jahun. 5,921,107.22 5,921,078.84 28.38 Min of Health

7

Proposed Constr. Of basic Health Center/Health Clinic in 3No constituency Across the State

(Constituency Project 2019) 80,958,192.71 84,318,515.87 (3,360,323.16) Min of Health

8 Propose constr. Of L-1 Maternity Ward 14,971,614.98 17,484,899.82 (2,513,284.84) Min of Health

9 Proposed Constr. Of New General Hospital Birnin Kudu (Variation/Additional work) 594,212,839.12 595,712,672.97 (1,499,833.85) Min of Health

10 Upgrading of Miga Primary Health Care to General Hospital 3,757,000.00 3,625,000.00 132,000.00 Min of Health

11 Proposed Ceiling Work, Standing A/C gate and Road Way at Dutse Central Store (JIMSO) 21,580,549.65 19,373,025.33 2,207,524.32 Min of Health

12 Proposed Upgrading of yankwashi Primary Health care (PHC) to General Hospital 118,100,478.89 118,379,880.39 (279,401.50) Min of Health

13 Proposed Procurement of 500No. Mattresses to School of Health Technology Jahun 7,500,000.00 7,500,000.00 - Min of Health

14 Proposed Upgrading of maigatari Health Care (PHC) to General Hospital 107,151,264.74 107,252,313.59 (101,048.85) Min of Health

15

Proposed renovation of Dr. Abbas house and Replacement of ridge Cap at GOPD Ward Maternity,

Pediatri, Postnatal wards at Dutse General Hospital 2,685,536.00 2,578,536.00 107,000.00 Min of Health

16

Proposed Construction of 40 bed ward 183 meters length liking walk ways (59No. Total module

area) at Jahun General Hospital 47,666,736.17 48,440,728.62 (773,992.45) Min of Health

17

Proposed Construction of BHC, 20Beds Ward and Health Post at Gwiwa, Fagam and Taura

Constituencies 18,278,424.15 19,425,717.13 (1,147,292.98) Min of Health

18 Proposed renovation/Improvement of Sule Tankarkar PHC 96,052,991.24 91,032,017.12 5,020,974.12 Min of Health

19 Proposed upgrading of Kiyawa primary Health Centre to Cottage Hospital 97,753,082.68 96,214,947.77 1,538,134.91 Min of Health

20 Proposed Renovation / Improvement of kanya Babba PHC (Phase II) 99,872,710.10 94,483,309.50 5,389,400.60 Min of Health

21 Proposed Construction of Student Hostel at College of Nursing and Midwifery Birnin Kudu 83,799,369.99 90,089,863.85 (6,290,493.86) Min of Health

22 Proposed Renovation Construction Maintenance Works at Dutse General Hospital ( laboratory Unit) 8,343,703.18 8,919,296.62 (575,593.44) Min of Health

23 Proposed Upgrading of roni primary health centre to Cottage Hospital (Phase II) 96,202,050.59 96,202,050.59 - Min of Health

24 Proposed Construction and renovation works at Bulangu Cottage Hospital 96,939,259.09 98,846,893.09 (1,907,634.00) Min of Health

25

Upgrading of malam Madori Primary Health Center to General Hospital ( Proposed Additional Work)

Extension of 407.12 Meters Wall Fencing (117 Modules) 22,164,224.24 23,257,704.02 (1,093,479.78) Min of Health

26 Proposed Renovation of GOPD, Isolation ward, Maternity & OPD at Gumel General Hospital 31,908,670.69 33,521,749.27 (1,613,078.58) Min of Health

27 Proposed Improvement of power supply at Ringim General hospital 7,043,482.66 6,883,022.25 160,460.41 Min of Health

28 Proposed Erecting of retaining wall for Erosion control at Rashid Shekoni Specialist Hospital Dutse 4,993,733.00 5,775,774.09 (782,041.09) Min of Health

29

Renewal of contract for the provision of cleaning services (Admin Block and ITS Surroundings ) at

Rasheed Shekoni Specialist Hospital Dutse 2,446,742.00 2,446,742.00 - Min of Health

30 Proposed Laterite sand filling and Embankment at Hadin Newly Constructed Basic Health Clinic 3,812,852.00 3,521,326.57 291,525.43 Min of Health

31 Proposed Supply and Installation of Medical Equipment to the Newly Constructed 25No Basic Health Clinic Across the State95,423,350.00 95,423,350.00 - Min of Health

32 Proposed Construction of New General Hospital Birnin Kudu (additional works) 594,212,839.12 595,712,672.97 (1,499,833.85) Min of Health

33

Proposed procurement of Beds, Mattresses and Dining Table & Chairs for Dr. Paul at Babura Gen

Hospital 1,072,000.00 1,072,000.00 - Min of Health

34

Proposed Procurement of Beds, Mattresses Chairs and Grass Cutting Machine for School of Nursing

hadejia 6,070,000.00 5,300,000.00 770,000.00 Min of Health

35 Proposed External Works at Garki General Hospital (additional works) 5,377,542.45 5,377,542.45 - Min of Health

36 Proposed external works at Gantsa General Hospital (additional works) 8,947,304.07 8,947,304.07 - Min of Health

37 Proposed repairs and Services of Radiology Equipment at rasheed Shakoni Specialist Hospital Dutse 5,887,500.00 5,887,500.00 - Min of Health

38 Proposed Repairs Renovation of GOPD Ward and Maternity at Dutse General Hospital 7,807,170.11 8,525,676.79 (718,506.68) Min of Health

-

MINISTRY OF WATER RESOURCES -

39

Proposed Upgrading and conversion of water schemes at Balago and Bakar Kuka in Dutse Zone and

Ringim Zone. 11,951,862.93 11,951,862.93 - STOWA

40 Propsed Rehabilitation of (88No.) Hand Pumps Borehole in 24No. Community of Babura LGA 3,534,825.00 3,364,729.00 170,096.00 RUWASA

41

Proposed Improvement of Reticution and Conversion of 3No. Motorized Boreholes to Solar at Kafin

Gana in Birnin kudu LGA 20,515,697.42 20,714,129.42 (198,432.00) STOWA

42

Proposed Rewinding of Flight Pump, High Lift Pump and procurement of Gen. set at Ringim, Kazaure,

Dutse and Hadejia Town 9,503,000.00 9,313,000.00 190,000.00 JS Water Board

43 Conversion of Motorized Pumps to Soler Power Schemes at Babura Town, Babura LGA 1,492,710.00 1,452,710.00 40,000.00 JS Water Board

44 Conversion of Motorized Pumps to Soler Power Schemes at Gagarawa LGA 49,928,704.96 49,136,641.39 792,063.57 JS Water Board

45

Conversion of Motorised Pumps to Solar powered schemes at Babura town, Babura LGA (Additional

works) 2,551,000.00 2,438,500.00 112,500.00 JS Water Board

46 Proposeed Pipeline Reticulations (28.6KM) in Kazaure Town 537,951,025.00 530,771,054.78 7,179,970.22 Water Board

47 Proposed Construction of 50No. Handpump Across the state 36,897,000.00 36,897,000.00 - STOWA

48

Proposed Construction of New Solar Power Schemes, Conversion and Improvement of motorized

Water Schemes in Dutse and its Environment (Revised) 254,346,007.74 249,431,025.31 4,914,982.43 Water Board

49

Proposed Upgrading and Conversion of motorised water supply schemes to Solar Powered at Zareku

Town 11,920,254.81 10,905,152.57 1,015,102.24 Stowa

50 Proposed Rehabilitation of (3No) water Suppkly Schemes in Gumel Zone 4,644,281.25 4,644,281.25 - Stowa

51 Proposed Rehabilitation of (18no) water supply Schemes Across the Across the State 10,678,390.00 9,748,615.00 929,775.00 Stowa

52 Proposed Constr. Of 1No. Solar Powered water supply scheme at Kandi in Dutse LGA Zone 6,023,325.00 6,023,325.00 - Stowa

53

Proposed Upgrading and Conversion of 7No Motorised Water Supply Schemes to Solar Powered at

Gumel and Birnin Kudu Zone 75,786,760.67 72,494,502.73 3,292,257.94 Stowa

54

Proposed Uprading and Conversion of Motorised Water supply schemes to Solar powered at

Sugungun in Ringim Zone 14,002,788.55 12,582,658.31 1,420,130.24 Stowa

55

Proposed Uprading and Conversion of Motorised Water supply schemes to Solar powered at Kadira

Small Town Guri LGA 25,794,513.36 22,443,547.29 3,350,966.07 Stowa

56

Proposed for the Constr of New Solar Schemes at New Market Zai/Galadimawa and Improvement at

Main And Shuwarin Sabuwa Pump Station, Dutse 25,151,888.00 25,151,888.00 - Min of Water Resources

57

Constr.of New Solar Schemes at New Market, Zai/Galadimawa and improvement at Main and

Shuwarin sabuwa Pump Station Dutse 4,967,123.70 4,295,024.00 672,099.70 Min of Water Resources

58

Proposed Uprading and Conversion of Motorised Water supply schemes to Solar powered at Dutse

Zone 14,986,568.05 14,561,003.05 425,565.00 Stowa

59 Proposed Constr. Of 1No Solar Powered water supply Scheme at Daki Daka in Garki LGA Ringim Zone 6,023,325.00 6,023,325.00 - Stowa

60 Proposed Constr. Of 1No Solar Powered water supply Scheme at Kunyafa in Babura LGA Ringim Zone 6,023,325.00 6,023,325.00 - Stowa

61 Proposed Constr. Of 1No Solar Powered water supply Scheme at Damfa in Babura LGA Ringim Zone 6,023,325.00 6,023,325.00 - Stowa

62 Proposed Refurbishing of Some Vehicles 19,061,760.38 14,639,493.75 4,422,266.63 Min of Water Resources

63 Proposed Procurement of 12No Tyres tube and liners for the 2No Water Tanks in the Ministry 2,579,720.00 1,564,000.00 1,015,720.00 Min of Water Resources

64 Proposed Constr. Of (504No) of Facilities in Gagarawa LGA 10,899,200.00 10,322,000.00 577,200.00 Ruwasa

65 Proposed Constr. Of (1,641No) of Facilities in Kiyawa LGA (ODF) 36,734,100.00 33,462,843.75 3,271,256.25 Ruwasa

66 Proposed Constr. Of (956No) of Facilities in Auyo LGA (ODF) 21,595,600.00 19,527,375.00 2,068,225.00 Ruwasa

67

Proposed constr of New Solar Schemes at New Market, Zai/Galadima and Improvement at main and

Shuwaring Sabuwa Pump Station, Dutse (Additional work) 2,515,888.00 2,515,888.00 - Min of Water Resources

68

Upgrading & Conversion of (22No) water supply schemes to solar powered system Across the state

(Lot-1) 8,981,385.00 8,923,322.50 58,062.50 Stowa

69

Proposed Upgrading & Conversion of Zaburan small town motorised water supply scheme to solar

powered 15,343,500.00 15,343,500.00 - Stowa

70 Proposed upgrading of existing water supply schemes at Gwiwa local Government Area 37,601,902.52 37,833,112.97 (231,210.45) JS Water Board

71 Upgrading and Conversion of 30No Small towns water supply scheme to solar Across the State 6,387,376.80 6,075,265.25 312,111.55 Stowa

72

Proposed rehabilitation of water supply schemes at Babura, Kiri Kasamma & Hadejia in Ringim &

Hadejia Zone 7,621,950.00 7,543,200.00 78,750.00 Stowa

73 Proposed rehabilitation of water supply schemes at Auyo, kiri kasamma and Hadejia in Hadejia 7,818,300.00 7,660,800.00 157,500.00 Stowa

74 Proposed construction of (38No) Hand Pump Borehole Across the State 28,041,729.00 28,041,729.00 - Ruwasa

75 Proposed rehabilitation of water supply schemes in Ringim, Kazaure and Dutse Zone 6,555,150.00 6,413,400.00 141,750.00 Stowa

76

Proposed rehabilitation of water supply schemes at Babura and Sule Tankarkar in Ringim and gumel

Zone 7,698,600.00 7,541,100.00 157,500.00 Stowa

77 Proposed Construction of (40No) Hand Pumps Borehole Across the state 29,517,600.00 29,517,600.00 - Ruwasa

78

Proposed rehabilitation of water supply schemes at Hadejia, Malam Madori, Kaugama, Birniwa, Guri

and Auyo in Jahun and hadejia Zone 8,070,300.00 7,660,800.00 409,500.00 Stowa

79

Proposed upgrading and conversion of 2No motorized water supply scheme to solar powered at

gangara in babura LGA Ringim Zone 6,829,987.50 6,829,987.50 - Stowa

80 Construction of new solar powered water supply schemes at Babura tsallake 1,159,351.26 1,109,750.00 49,601.26 JS Water Board

81 Proposed rehabilitation of 2No Borehole at School of nursing Hadejia 1,373,163.75 1,354,145.63 19,018.12 JS Water Board

82

Proposed Conversion of Motorized Water Schemes to Solar Powered Water Schemes and Some

Rehabilitation at College of Education, Gumel 30,197,849.17 29,287,259.96 910,589.21 JS Water Board

83

Proposed Construction of 1No Solar powered water supply scheme at Yannmaulu Tsohuwa in

babura & Ringim Zone 6,023,325.00 6,023,325.00 - Stowa

84

Proposed Upgarding and Conversion of motorised water supply schemes to Solar Powered at Ringim

Zone 19,228,758.15 18,459,647.97 769,110.18 Stowa

85 Proposed Conversion of Motorised pumps to Solar Powered Schemes at Sule Tankarkar LGA 2,771,126.93 2,797,219.43 (26,092.50) JS Water Board

86 Proposed Rehabilitation of (13No) water supply scheme in Ringim, Kazaure and Gumel 14,032,200.00 12,788,475.00 1,243,725.00 Stowa

87 Proposed Rehabilitation of (19No) Water Supply Schemes in Ringim Zone 20,400,450.00 17,361,750.00 3,038,700.00 Stowa

88

Proposed upgarding and Conversion of motorised water supply schemes to Solar Powered

atMaizuwo in Sule Tankarkar Zone 6,829,987.50 6,829,987.50 - Stowa

89 Proposed Rehabilitation of Water supply schemes at Auyo, Kirikasamma and Hadejia in Hadejia zone. 6,555,150.00 6,413,400.00 141,750.00 Stowa

90

Proposed Rehabilitation of 3no Small towns water supply schemes In Birnin Kudu, Ringim and

hadejia 7,951,440.00 8,014,597.50 (63,157.50) Stowa

91 Proposed Rehabilitation of 3no Small towns water supply schemes In Gumel and Jahun Zone 4,215,750.00 4,089,750.00 126,000.00 Stowa

92 Proposed Rehabilitation of 3no small Towns water supply schemes in Ringim and Birnin Kudu Zone 7,001,596.88 7,001,596.88 - Stowa

93

Proposed Conctruction of 1no. Solar powered water Supply scheme at Nafara in Kiyawa LGA Dutse

Zone 6,023,325.00 6,023,325.00 - Stowa

94 Proposed Rehabilitation of 7no. Small towns water supply schemes in Hadejia, Gumel and jahun Zone 4,940,250.00 4,630,500.00 309,750.00 Stowa

95 Proposed Rehabilitation of 2No Small Towns water supply schemes in Dutse Zone 3,370,500.00 3,370,500.00 - Stowa

96 Proposed Rehabilitation of 2No Small Towns water supply schemes in Birnin Kudu Zone 2,908,500.00 2,887,500.00 21,000.00 Stowa

97 Proposed Procument of Generating set for Kazaure and Birnin Kudu Zone 28,615,253.66 28,619,712.07 (4,458.41) JS Water Board

98 Proposed Over Hauling of Generating sets across the state 9,781,910.00 9,171,892.50 610,017.50 JS Water Board

99 Proposed Rehabilitation of 6No Small towns water supply schemes in Hadejia, Gumel and Jahun Zone 5,362,035.00 5,047,035.00 315,000.00 Stowa

100 Rehabilitation of water supply schemes at Gwaram town (Additional Works) 708,660.75 708,660.75 - JS Water Board

101

Proposed Construction of New Solar Schemes ay Yalwawa, Malam Inuwa Dutse Housing Estate

(MIDEH) and & 744 Danmasara 99,856,958.51 98,158,678.54 1,698,279.97 Min of Water Resources

102 Proposed Procurement of Assorted submersible pumps across the state 19,479,796.87 19,479,796.87 - JS Water Board

103 Proposed rehabilitation of 2no Small Towns water supply Schemes in gumel Zone 1,155,000.00 1,018,500.00 136,500.00 Stowa

104

Proposed Construction of 2no New Solar powered water supply scheme at Malarin Gamm in Malam

Madori LGA and Walawa in Birniwa Local Government Area 12,046,650.00 12,046,650.00 - Stowa

105 Proposed Rehabilitation of water supply scheme at Taura Town 10,723,753.67 10,526,670.91 197,082.76 JS Water Board

106

Proposed Constructio of (148No) Laterines and (24,000) Tippy tap Across the Communities of

Gwiwa and Roni Local Government Area 2,990,400.00 2,990,400.00 - Ruwasa

107

Proposed Construction of (22No) Hand Pump Borehole at 22 communities in Sule Tankarkar and

Maigatari Local government Area 16,234,680.00 16,234,680.00 - Ruwasa

108

Proposed Construction of (15No.) hand Pump Borehole at 15 Communities in Sule Tankarkar Local

Government Area 11,069,100.00 11,069,100.00 - Ruwasa

109

Proposed Construction of (12No) Hand pump borehole at 15 Communities in Sule Tankarkar Local

Government Are Gumel Zone 8,855,280.00 8,855,280.00 - Ruwasa

110

Proposed Constructionn of (6No.) Hand Pump Borehole at 6 Communities in Sule Tankarkar and

Kafin and Kafin Hausa Local Government Area 4,427,640.00 4,427,640.00 - Ruwasa

111

Proposed rehabilitation of 5No Small Towns Water supply schemes in Birnin Kudu Dutse, jahun and

Kazaure Zone 6,127,170.00 6,105,109.50 22,060.50 STOWA

112

Proposed Upgrading and Conversion of 1No Motorized Water supply Scheme to Solar Powered at

Jabo in Jahun Zone 23,596,060.01 23,567,109.24 28,950.77 Stowa

113

Proposed Construction of 4No New Solar water powered supply scheme at Danmarke, Wada,

Kayarda and Garin baki in Babura LGA, Ringim Zone 24,093,300.00 24,093,300.00 - Stowa

114 Proposed Procurement of Assorted Submersible pumps Across the State 19,479,796.87 19,479,796.87 - JS Water Board

115 Procurement of assorted sumbersible pumps across the state (Additional works) 882,000.00 882,000.00 - JS Water Board

116

Proposed rehabilitation of 2No Small Town water supply schemes at ruru and Budinga town in dutse

and gwaram LGs 882,000.00 882,000.00 - Stowa

117 Proposed Upgrading and Conversion of Doko water supply scheme in Garki Local Government Area 8,358,328.13 8,004,990.11 353,338.02 Stowa

118

Proposed upgrading and Conversion of 1No Motorized water supply scheme to Solar Powerd at Uku

Da Sisi Sabuwa in Babura LGA, Ringim Zone 7,005,526.45 6,767,532.45 237,994.00 Stowa

119

Proposed rehabilitation of 3no Small towns water supply schemes at Ruru, Budinga and Yabaza in

Dutse and Birnin Kudu Zone 2,100,000.00 2,100,000.00 - Stowa

120

Proposed Rehabilitation of 2No Small town water supply schemes at Yan Damo and malam Baki in

Gumel zone 8,895,181.68 8,482,573.26 412,608.42 Stowa

121 Proposed Rehabilitation of 17No. Small Towns water supply schemes at Hadejia and Jahun Zone 5,161,739.63 5,161,739.63 - Stowa

122 Proposed rehabilitation of 1No Solar water supply schemes at Modoji in Sule Tankarkar 1,557,281.25 1,667,531.25 (110,250.00) Stowa

123 Proposed Construction of (40No) Hand Pump Boreholes Across the state 29,517,600.00 29,517,600.00 - Ruwasa

124 Proposed Rehablitation of (34No) Hand Pump Borehole at Babura LGA 1,953,600.00 1,478,400.00 475,200.00 Ruwasa

125

Improvement of Gwaram Tsohuwa and gwaram Sabuwa Towns Water supply scheme (Additional

works) 34,045,356.30 29,520,524.45 4,524,831.85 JS Water Board

126

Proposed Construction of 1No water Collection, 1No Complete Borehole in Hadejia Town and 1No

Hand pump Borehole at Babura LGA 2,898,139.00 2,813,984.25 84,154.75 Ruwasa

127

Conversion and Upgrading of motorized Borehole to Solar Powered supply (7No.) at kanya Babba

Main pump station, kanya babba water for all station, kanya babba LGA, Danzomo II Pump station,

Kudai Pump station and Waza pump station (Additional works) 3,534,038.03 3,534,038.03 - Stowa

128 Proposed constr of 50no. Hand pump borehole at 50 communities across the state 36,897,000.00 36,897,000.00 - Ruwasa

129 Proposed constr of 1no. Solar powered water supply scheme at Dorai in Garki LGA, Ringim zone 6,023,325.00 6,023,325.00 - Stowa

130 Proposed procurment of 200KVA Gen set as change of purpose in Kazaure Water supply project 12,977,439.30 12,977,439.30 - JS Water Board

-

MINISTRY OF EDUCATION -

131Proposed Procurement of Office Equipment for Permant Senate Building office 14,128,590.00 13,397,475.00

731,115.00 Sule Lamido University

132

Proposed Renovation Works of Classroom Blocks (Each) at 5No Senior Secondary School Across the

State22,404,592.38 22,487,382.75

(82,790.37) Min of Education

133 Proposed Construction of Admin Block and 6-Seater pit Latrine 21,998,145.35 21,998,145.35 - IEB

134 Proposed Construction of 1No Block of Three Classrooms 11,202,005.64 11,202,005.64 - IEB

135 Proposed Construction of 4No Hand Pumps 2,410,000.00 2,410,000.00 - Bamaina Gifted Academy

136 Proposed Construction and Renovation works at Bamaina Academy 5,368,288.27 5,649,771.21 (281,482.94) Bamaina Gifted Academy

137 Proposed Construction of 1No Block of Three Classrooms 15,371,199.96 15,455,343.81 (84,143.85) COI&LS Ringim

138 Proposed Construction of one Block Two Laboratories at GGDSS Roni 28,487,680.00 33,552,607.41 (5,064,927.41) Min of Education

139

Proposed Procurement and Distribution of 3-seater Students Desks and Benches, Principals and Staff

room Furniture for Senior Secondary school across the state 85,299,375.00 85,115,625.00 183,750.00 Min of Education

140 Proposed Procurement of 1No Brand New 350KVA sound proof perkins Generator 22,722,577.50 22,722,577.50 - Sule Lamido University

141 Proposed Renovation Works at Lautai Gumel LGA (GDSS) 57,457,387.79 60,686,506.55 (3,229,118.76) Min of Education

142 Proposed renovation of staff houses and hostels at College of Education Gumel 334,671,516.44 383,489,242.44 (48,817,726.00) Min of Education

143

Proposed Procurement and Distribution of Instructional Materials for nomadic Primary Schools

Across the State 16,408,750.00 16,206,625.00 202,125.00 Nomadic Education

144

Proposed Procurement and Distribution of (750No.) 3 Seater Desks and (4,000No) Sitting Mats for

Nomadic School Across the State 16,750,000.00 14,965,000.00 1,785,000.00 Nomadic Education

145

Proposed fRenovation of Windstorm Damaged Structures (Phase II) at Science Secondary Secondary

School Lautai gumel (additional works) 3,168,882.15 3,168,882.15 - Scinece& Tech Board

146

Proposed Constr. Of Gate House and Wall Fence at Jigawa College of Remidial and Advance Studies

Babura (JICORAS) 103,229,892.40 137,837,089.74 (34,607,197.34) Min of Education

147 Proposed Procurement of Chalk for Baic Schools Across the State 26,228,020.00 26,228,020.00 - Subeb

148

Proposed Procurement of Science Laboratory Equipments for Distribution to 9No senior Secondary

Schools Upgraded to Science Centres of Excellence Core-2 81,068,353.92 81,068,353.92 - Min of Education

149 Proposed Renov of Storm Damaged structures at GSSS Taura, CGSSS Roni and GSTC Hadejia 49,576,548.66 50,071,865.14 (495,316.48) Science & Tech Board

150 Proposed Constr of new Mega School in Dutse 215,689,695.60 225,089,449.84 (9,399,754.24) Min of Education

151

Constr of Female student's Hostel at Sule Lamido University Kafin Hausa (Proposed steel roof

members) 18,028,810.00 18,028,810.00 - Sule Lamido University

152

Proposed Procurement of Office Materials and Renov/Conversion of Political Party Office to Admin

Block and Lecture classrooms at College of Remidial and Advance studies Babura 11,313,450.39 14,046,670.75 (2,733,220.36) Min of Education

153

Proposed Registration with JAMB ABU Zaria and take-up grant of College of Remidial and Advance

studies Babura 2,350,000.00 2,350,000.00 - Min of Education

154 Proposed Procurement of 1no Isuzu Septic tank 23,820,000.00 22,878,228.51 941,771.49 Sule Lamido University

155

Proposed procurement and Distribution of School uniforms, Sandals and Bags for Nomadic schools

across the state 29,980,000.00 27,880,000.00 2,100,000.00 Nomadic Education

156 Proposed constr of JICORAS at Babura (phase I) (revised Scope) 440,761,393.03 450,720,554.97 (9,959,161.94) Min of Education

157 Proposed departmental works and purchases for NBTE Requirements 5,310,020.00 5,310,020.00 - Bilyamu Usman Polytech

158 Proposed conduct of 2019 Musabaqar Ilimi 14,336,100.00 13,591,350.00 744,750.00 Islamic Education Bureau

159

Proposed Procurement of Laboratory Equipments and Reagent , Food nutrition/catering craft

practice and Animal Husbandary Items for waec and Neco Accreditation of Science secondary

schools 9,384,546.00 8,493,252.00 891,294.00 Science & Technical Board

160 Proposed Procurement of examination materials 1,420,000.00 1,420,000.00 - Bilyamu Usman Polytech

161 Proposed Construction of Library Phase II at New Campus, Binyaminu Usman Polytechnic Hadejia 44,992,746.03 42,334,242.16 2,658,503.87

Binyaminu Usman

Polytechnic

162 Proposed Procurement of Academic Gowns 2,615,000.00 2,270,000.00 345,000.00

Binyaminu Usman

Polytechnic

163

Proposed Procurement of Instructional / Enterpreneuship Materials, Jamb Scratch Cards and 5-Day

Training Workshop for FTDS Facilitator for the 3rd years scale up of FTDS 14,904,900.00 10,044,900.90 4,859,999.10 Ministry of Education

164

Proposed Construction of (1No) Hostel Block for Jigawa State Institute of Information and

Technology Kazaure 49,994,477.82 47,989,101.98 2,005,375.84 JSIIT Kazaure

165

Proposed Construction of 6 Classroom Blocks at the Proposed Boys and girls Junior Science

Secondary School Gumel (1st Quarter Constituency Project 2019) 30,520,842.46 29,997,708.62 523,133.84 SUBEB

166 Proposed Procurement of (250No) Student's Mattresses 1,925,000.00 1,925,000.00 -

Binyaminu Usman

Polytechnic

167 Procurement and Installation of a Brand New 100KVA Soundproof Perkins Generator (1100 Series) 5,334,960.00 5,334,960.00 -

Binyaminu Usman

Polytechnic

168

Proposed External Electrical power supply 33KV Dedicated feeder from Hadjia (Lot-1 of the phase II

Project 46,289,431.23 51,049,397.56 (4,759,966.33) Sule Lamido University

169

Proposed External Electrical power supply 33KV Dedicated feeder from Hadjia (Lot-2 of the phase II

Project 39,137,223.31 42,158,908.89 (3,021,685.58) Sule Lamido University

170

Proposed procurement of science laboratory equipments for senior secondary schools across the

state 33,630,751.71 33,630,751.71 - Ministry of Education

171

Proposed procurement and distributions of (34,304No.) Science text books and teachers guide for

senior secondary across the state 49,949,800.00 49,949,800.00 - Ministry of Education

172 Proposed food order for 500 students per week in Boarding Schools 442,280.00 438,260.00 4,020.00 Ministry of Education

173

Proposed external electrical power supply 33KV Dedicated feeder from Hadejia ( Lot-3 of the Phase I

Projects) 29,676,826.34 29,676,826.34 - Sule Lamido University

174

Proposed NTBE Accreditation resources inspection and affiliation for 12No Programs in the

Polytechnic 9,225,000.00 8,976,000.00 249,000.00

Jigawa State

Polytechnic

175 Proposed procurement of 1no Toyota Avensis (2018 Model) 28,934,000.00 28,934,000.00 - Sule Lamido University

176 Proposed procurement of 1No Toyota Corolla (2018 Model) 18,800,000.00 17,718,750.00 1,081,250.00 Sule Lamido University

177 Proposed Procurement of workshop materials and Consumables items in 4No Technical Colleges. 8,188,250.00 8,188,250.00 - Scinece& Tech Board

178 Proposed payment of facilitators for Litracy programme 30,630,000.00 30,630,000.00 - Mass Education

179 Proposed Staff Training and Development 3,638,622.00 3,638,622.00 - Bilyaminu Usman Poly

180 Proposed Renovation of 1No 3 Bedroom House 3,032,747.22 2,991,989.63 40,757.59 Bilyaminu Usman Poly

181 Proposed Procurement of (2No) Vehicles 27,950,000.00 27,950,000.00 -

State Polytechnic,

Dutse

182

Proposed Production of (4,266 sets) of 3-seater students furniture from scraps at various schools

across the state 20,000,031.84 20,000,031.84 - Min of Education

183

Proposed rennovation of classrooms and Admin Block at Sugungu Primary School Garki LGA and

GGJSS Gagarayaga Gwaram LGA 9,774,322.12 9,774,322.12 - Min of Education

184 Proposed External Electrical Power supply for permanent senate building Lot-2 27,171,584.37 24,691,772.46 2,479,811.91 Sule Lamido University

185

Proposed External Electrical Power supply 33KV Dedicated feeder from Hadejia Lot-III of the Phase Ii

Project 49,183,473.65 47,439,656.28 1,743,817.37 Sule Lamido University

186

Proposed renovation of classrooms blocks, Hostel, workshop, Library GJSS Aujara and re-

Construction of wall fence at Model Boarding Primary School Kila 42,117,899.50 45,009,447.40 (2,891,547.90) Min of Education

187 Proposed accreditation of 11No Pragrammes in the Polytechnic 3,110,900.00 3,110,900.00 - Bilyamin Usaini Poly

188

Proposed printing of Examination papers with answer sheets by Jigawa State Printing press for

senior secondary schools across the state 8,110,096.50 8,247,851.33 (137,754.83) Min of Education

189

Proposed printing of 2019 basic education certificate examination (BECE) Question papers with

answer sheets 16,724,512.00 15,260,680.05 1,463,831.95 Min of Education

190 Proposed repairs of 1No Monitoring Vehicle (Toyota Hilux) 2,228,500.00 2,005,200.00 223,300.00 Nomadic Education

191

Proposed External electrical power supply for shopping complex,Clinic, Junior Staff Quarters and

VC's Lodge ( Lot-1) 46,004,312.20 42,497,088.81 3,507,223.39 Sule Lamido University

192 Proposed perimeter demarcation and Survey/Topographical and detail survey of the polytechnic 5,262,136.00 5,022,948.00 239,188.00 Bilyaminu Usman Poly

193 Proposed Renovation works at Jigawa State Research Institute Kazaure 9,775,628.66 9,713,139.27 62,489.39 Res earch Ins titute Kazaure

194Prposed procurement of new tractor (QLN-654, 65HP) and implement, Kazaure Research Institute 6,925,000.00 6,925,000.00

- Res earch Ins titute Kazaure

195Proposed production of 10HA each of millet & seame, 3HA groundnut and 3HA cowpea, Kazaure

Research Institute

4,763,300.00 4,778,300.00 (15,000.00) Res earch Ins titute Kazaure

196Proposed training on Artificial Insemination techniques and Insemination of (300) cows at Kazaure

Research Institute

5,923,015.00 5,923,015.00 - Research Institute Kazaure

197 proposed procurement of vehicles at JICORAS Babura 47,250,000.00 47,250,000.00 - Min of Edcucation

198 Price of LAPTOP Lenovo BSO-10 Comuputer (variety) 807,500.00 807,500.00 - Scholarship Board

199 Proposed constr of Block of 3-classrooms at Ringim College of Islamic & legal Study. 15,371,199.96 15,455,343.81 (84,143.85) COI&LS Ringim

200 Proposed procurement of Examination material;s Ringim College of Islamic & legal Study. 4,600,000.00 4,600,000.00 - COI&LS Ringim

201

Proposed supply and Installation of (52no) street light inntergrated Ringim College of Islamic & legal

Study. 32,215,050.00 32,215,050.00 - COI&LS Ringim

202 Proposed procurement of instructional materials for (81no) post literacy centre across the state. 3,239,670.00 3,191,790.00 47,880.00 Agency for Mass Educ.

203

Action plan for Establishment of 81 Remidial and 36 Continuing Education centre facilitators monthly

allowance and Airtime programme 56,554,350.00 56,074,342.50 480,007.50 Agency for Mass Educ.

204 Proposed renovation of science Laboratories and ITC Room Each at 9No. Senior Secondary Schools 15,421,179.00 24,143,284.04 (8,722,105.04) Min of Education

205

Proposed renovation of storm damages at GDASS Dantanoma, SAIS Hadejia, GDASS Zainab Kazaure,

GDASS Dabi, GDASS Birnin kudu, GDASS Gwaram and GDASS Danzomo 57,822,208.00 53,582,692.89 4,239,515.11 IEB

206 Proposed renovation of classrooms Blocks at MBPS Kudai in Dutse 4,450,715.27 4,971,711.32 (520,996.05) SUBEB

207 Proposed renovation of classrooms blocks at Kabewa and Samangara in Gwaram and Sule Tankarkar 7,213,644.52 5,824,507.21 1,389,137.31 SUBEB

208 Proposed re-construction of wall fence at GGUSS Garki and GGUSS Malam Madori 11,334,094.59 9,039,035.07 2,295,059.52 Min of Education

209 Proposed procurement of Double Decker Beds and Mattrasses 4,000,000.00 2,950,000.00 1,050,000.00 Bamaina Gifted Academy

210 Proposed procurement of Students uniform and Protective clothings 2,284,000.00 1,898,000.00 386,000.00 Bamaina Gifted Academy

211 Proposed Renovation of storm damaged structures at GSTC Karkarna SSS Kafin Hausa and GSSS Jahun 24,498,727.08 35,803,002.26 (11,304,275.18) SUBEB

212

Proposed procurement of (30,000 sets) School Uniforms for Senior Secondary Schools Girls Across

the State 78,000,000.00 78,000,000.00 - Min of Education

213

Proposed Construction of Admin Block, Students Hostel, Laboratory, 6 Seater Pit Latrine and 1 block

3 classroom 11,169,666.72 11,202,005.64 (32,338.92) Min of Education

214

Proposed Procurement of Instructional materials for women funtional literacy and payment of

programme facilitators 5,859,500.00 5,667,800.00 191,700.00 Mass Education

215 Proposed Procurement of Instructional Materials 2,682,564.00 2,430,324.00 252,240.00 Bamaina Gifted Academy

216 Proposed procurement of sporting equipments 474,300.00 474,300.00 - Bamaina Gifted Academy

217

Proposed Procurement of ICT Materials and Accessories for Distribution to 9No Senior Secondary

Schools upgraded to Science Center of Excellence 65,958,600.00 68,982,322.50 (3,023,722.50) Min of Education

218 Proposed Construction of A Prototype 480 Capacity Students Hostel 379,307,287.02 390,002,952.26 (10,695,665.24) Sule Lamido University

219 Proposed Conduct of 2019 Qur'anic Recitation competition 25,970,040.00 25,218,600.00 751,440.00 IEB

220 Proposed Renovation of Storm Damaged at 7No Schools Across the State 21,608,545.23 23,498,908.59 (1,890,363.36) Min of Education

221 Propose 2019 Capital Project 3,000,000.00 3,000,000.00 - JSIIT Kazaure

222 Proposed procurement of 1No Isuzu Septic Tank 23,820,000.00 18,425,462.35 5,394,537.65 Sule Lamido Uni

223

Proposed Procurement of science laboratory equipments for distribution to 9No Senior Secondary

Schools Upgraded to science centres of Excellence core-2 81,068,353.92 81,068,353.92 - Min of Education

224

Proposed Procurement of science laboratory equipments for distribution to senior secondary

schools across the state 29,491,628.31 29,491,628.31 - Min of Education

225 Proposed 2019 capital projects at JSCOE Gumel 20,004,592.06 19,702,558.36 302,033.70 Min of Education

226 Proposed renovation of Ringim divisional libarary 7,483,822.92 7,409,717.73 74,105.19 Library Board

227 Proposed Procurement of 150no. 3 Seater Student Desk 3,000,000.00 3,000,000.00 - Dutse Model School

228

Proposed Procurement of ICT Materials and Accessories for Distribution to 9No Senior Secondary

Schools upgraded to Science Centres of Excellence 65,958,600.00 68,982,322.50 (3,023,722.50) Min of Education

229 Proposed procument of Instructional materials for post Literacy centres across the state. 4,950,490.00 4,130,500.00 819,990.00

Agency for Mass

Education

MINISTRY OF WORKS -

230 Proposed Repairs of NYSC orientation Camp Generator 3,174,906.57 2,388,615.19 786,291.38 Ministry of Works

231 Construction of Jigawar Ali Township Road (2.10KM) by Messrs mothercat Nig LTD (additional) 224,213,450.06 203,412,195.00 20,801,255.06 Ministry of Works

232 Proposed Construction of 3KM Shoulder Along Gujungu - Gumel Road 18,301,342.50 20,172,442.50 (1,871,100.00) JIRMA

233 Proposed Stand Alone Solar Street Lighting Project at Babaldu Town in Birnin Kudu LGA 58,046,625.00 55,786,500.00 2,260,125.00 Ministry of Works

234

Proposed Relocation of 1No Hand Pump Borehole Affected By Road construction at Hadejia Road10

Gandun Sarki 629,790.00 629,790.00 - Ministry of Works

235 Proposed Procurement of ICT Equipment and Training of Staff 5,000,000.00 4,558,000.00 442,000.00 Urban Dev Board

236 Proposed Maintenance of Birnin Kudu-Kiyawa road 14,644,282.17 14,644,282.17 - JIRMA

237 Constr of Babura township roads (10.28km) (Lot-8) (additional work) Consultancy 7,745,437.31 7,745,437.31 - Ministry of Works

238

Stand Alone Solar Street Lighting Project at Garun-Gudiya (80) of Babura LGA and Garin - Gambo of

Gumel LGA 81,328,800.00 81,328,800.00 - Ministry of Works

239 Proposed Stand Alone Solar Street Lighting project at Marke town in Kaugama LGA (150no.) 81,328,850.00 82,797,750.00 (1,468,900.00) Ministry of Works

240 Proposed Supply and Installation of 800KVA Generator (Sound Proof) 46,446,759.80 46,263,912.00 182,847.80 REB

241 Proposed relocation of 12No Hand Pump Boreholes Affected by the township Roads Project in Gumel 8,855,280.00 8,855,280.00 - Ministry of Works

242 Relocation of water pipelines affected by the road Construction at Kaugama 5,429,983.61 5,387,600.40 42,383.21 Ministry of Works

243 Relocation of water supply facilities affected by the Road Construction at Kanya Babba Town 7,104,877.50 7,105,533.75 (656.25) Ministry of Works

244 Relocation of water supply facilities affected by the Road Construction at Jigawar Dan Ali Town 6,304,725.00 6,213,506.25 91,218.75 Ministry of Works

245 Relocation of Water supply facilities affected by the Road Construction at Chai-Chai Tsohuwa Town 2,391,637.50 2,391,637.50 - Ministry of Works

246

Proposed Relocation of Urban Town Street Light Installation affected by the Project (Construction of

Gumel Township Roads) 27,797,663.25 27,077,730.75 719,932.50 Ministry of Works

247

Proposed Relocation of Urban Town Street Light Installation affected by the Project ( Construction of

Zandam Nagogo Township Roads) 5,804,400.00 5,589,150.00 215,250.00 Ministry of Works

248

Proposed Relocation of urban town solar street light installation affected by the project (

Construction of jigawar dan Ali Township Roads) 1,139,250.00 1,055,000.00 84,250.00 Ministry of Works

249

Proposed Relocation of urban town solar street light installation affected by the project (

Construction of Kanya Babba township Roads) 1,438,500.00 1,370,000.00 68,500.00 Ministry of Works

250

Proposed Relocation of Urban Town street light installation affected by the project ( Construction of

Kiyawa Township Roads) 7,029,750.00 7,080,255.00 (50,505.00) Ministry of Works

251

Proposed Relocation of Urban Town street light installation affected by the project ( Construction of

MIga Township Roads) 8,583,750.00 8,715,262.50 (131,512.50) Ministry of Works

252 Proposed Construction of Hadejia Eastern Bye-Pass (Phase III) Water Damaged Section 58,964,002.00 58,607,439.60 356,562.40 JIRMA

253

Proposed Relocation of Electrical Installations (KEDCO) Affected by Roads Project (Construction of

744 Yalwawa Township Roads) 6,997,000.00 6,082,000.00 915,000.00 Ministry of Works

254

Proposed Relocation of Electrical Installations (KEDCO) Affected by Roads Project (Construction of

KanyaTownship Roads) 2,610,300.00 2,277,345.00 332,955.00 Ministry of Works

255

Proposed Relocation of Electrical Installations (KEDCO) Affected by Roads Project (Construction of

Jigawar dan AliTownship Roads) 1,754,010.00 1,740,375.00 13,635.00 Ministry of Works

256

Proposed Relocation of Electrical Installations (KEDCO) Affected by Roads Project (Construction of

Zandam Na GoGo Township Roads) 7,529,500.00 6,402,000.00 1,127,500.00 Ministry of Works

257 Relocation of Water supply facilities affected by the road Construction at Kazaure town 28,358,982.50 27,716,172.00 642,810.50 Ministry of Works

258

Proposed Relocation of Electrical Installations (KEDCO) Affected by Roads Project (Construction of

Chai-Chai TsohuwaTownship Roads) 3,411,000.00 3,049,000.00 362,000.00 Ministry of Works

259 Construction of Hadejia Township Roads Project (additional works) 214,624,764.24 214,624,764.24 - Ministry of Works

260 Stand Alone Solar Street Lighting Project at Emir Palace Road, Dutse 17,419,500.00 17,391,937.50 27,562.50 Ministry of Works

261

Proposed Relocation of Electrical Installations (KEDCO) Affected by Road Project Construction of

kiyawa Township Roads 6,923,000.00 6,075,000.00 848,000.00 Ministry of Works

262

Proposed Relocation of Electrical Installations (KEDCO) Affected by Road Project Construction of

Miga Township Roads 3,237,500.00 2,712,500.00 525,000.00 Ministry of Works

263

Proposed Relocation of Electrical Installations (KEDCO) Affected by Road Project Construction of

Gumel Township Roads 9,162,195.00 9,235,595.00 (73,400.00) Ministry of Works

264 Proposed protection work at Premises of GGSS Garu Dutse 9,180,953.44 9,180,953.44 - JIRMA

265

Proposed Relocation of Electrical Installations (Kedco) Affected by Roads Projects (Construction of

Gudunci-Aguyaka Road) 2,380,350.00 2,113,125.00 267,225.00 Ministry of Works

266 Proposed Repairs of Machines 4,682,000.00 4,682,000.00 - JIRMA

267

Proposed Improving access between sugungu and kashin ganji Communities in Garki Local

Government Area 8,387,424.15 8,387,424.15 - JIRMA

268

Proposed maintenance Rehabilitation of Some Failed Section along Kazaure Roni Asphaltic Concreter

surfaced Road 72,239,291.69 70,061,248.78 2,178,042.91 JIRMA

269

Proposed Maintenance Pathole Patching of Some Failed Spot Along Unguwar Mani-Koreyal-Rorou

Surfaced dressed Road 31,775,900.21 29,959,647.20 1,816,253.01 JIRMA

270

Proposed stand alone solar street lighting project at GGASS birniwa (42No) GGASS Kaugama (40No)

SOD Hadejia (30No) and JSS Guri (30No.) 77,002,800.00 77,002,800.00 - Ministry of Works

271 Proposed Maintenance of Maiganjara bridge along Jahun-Gujungu Road 6,586,482.00 6,588,449.70 (1,967.70) Ministry of Works

272 Proposed potholes patching along yarkirya-Dandi-Gada and Dandi-Achi lafiya roads 18,323,348.40 14,132,132.55 4,191,215.85 Ministry of Works

273

Proposed recllamation of eroded road embenkment and construction of Drainage at Yalo Borrow-Pit-

Gujungu-Hadejia road 8,962,589.58 8,962,589.58 - Ministry of Works

274 Proposed rehabilitation of Gumel to Gagarawa ITC Line 2,963,468.39 2,963,468.39 - Ministry of Works

275 Construction of Gambara-Waza-Baranda with spur road to Yalwa (16.8km) (additional works) 993,666,672.04 909,144,691.47 84,521,980.57 Ministry of Works

276 Proposed relocation of Electrical installations of Kaugama township road (KEDCO) 2,673,085.00 2,318,400.00 354,685.00 Ministry of Works

277 Construction of Babura Township Roads (10k.28) Lot-8 (additional works) 587,368,516.84 510,841,607.48 76,526,909.36 Ministry of Works

278 Proposed relocation of electrical installations (KEDCO) affected by Roads Project (Phase III) (Gumel) 1,895,500.00 1,672,625.00 222,875.00 Ministry of Works

279 Proposed relocation of water supply facilities affected by the township roads project in Hadejia town 451,750.00 451,750.00 - Ministry of Works

280

Proposed relocation of 3no hand pump borehole affected by the township roads project in Kiyawa

town 1,889,370.00 1,196,370.00 693,000.00 Ministry of Works

281 Proposed rehabilitation of Gwaram - Basirka ITC Line 141,110,326.37 141,110,326.37 - REB

282

Proposed relocation of 3No Hand pump borehole affected by the township roads project in kanya

babba town 1,889,370.00 1,889,370.00 - Ministry of Works

283

Proposed relocation of 1No Hand pump borehole affected by the township roads project in Jigawar

Dan Ali town 629,790.00 629,790.00 - Ministry of Works

284

Proposed relocation of 1No Hand pump borehole affected by the township roads project in Chai-Chai

Tsohuwa town 629,790.00 629,790.00 - Ministry of Works

285

Proposed relocation of 1No Hand pump borehole affected by the township roads project in 744

yalwawa 629,790.00 629,790.00 - Ministry of Works

286

Proposed relocation of 5no water collection points affected by the township roads project in Gumel

Town 6,264,993.00 6,264,993.00 - Ministry of Works

287

Proposed relocation of 2No hand pump borehole affected by the township roads construction at

Zandam nagogo town 1,259,580.00 1,259,580.00 - Ministry of Works

288 Proposed relocationn of 2No hand pumps borehole affected by the township roads peoject in miga 1,259,580.00 1,259,580.00 - Ministry of Works

289

Proposed relocationn of 12No hand pumps borehole affected by the township roads peoject in Gumel

town 2,468,970.00 2,468,970.00 - Ministry of Works

290

Proposed stand alone street lighting project at GGASS Danzomo (42No.) GGSS Sule Tankarkar (35No)

MBPS Gumel (30No.) and GGSSS Taura (32No.) 75,380,550.00 75,380,550.00 - Ministry of Works

291 Proposed maintenance of Auyo Town retaining wall-River embankment 49,718,008.41 49,718,008.41 -

Road Maintenance

Agency

292 Proposedf reclamation and construction of a Retaining wall at Kwalam Borrow Pit Along Ringim-Hadejia Road 11,564,426.37 11,564,426.37 -

Road Maintenance

Agency

293

Proposed stand alone solar street lighting project at GGASS Danzomo (42No) GGSS Sule Tankarkar

(35no.) MBPS Gumel (30No) and GGSSS Taura (32No) 60,780,300.00 60,780,300.00 - Ministry of Works

294

Proposed Stand Alone Street lighting project at GUSS Gwaram (45No.) GGASS Babura (38No.) and

GGSS Roni 60,780,300.00 60,780,300.00 - Ministry of Works

295 Proposed Relocation of water supply facilities affected by the Road Construction at Miga Town 9,044,352.75 8,653,117.55 391,235.20 Ministry of Works

296 Proposed Relocation of water supply facilities affected by the Road construction at Gumel Town 35,701,295.56 31,383,059.49 4,318,236.07 Ministry of Works

297

Proposed Relocation of water supply facilities affected by the Road construction at Zandam Nagogo

Town 5,984,754.23 4,674,262.16 1,310,492.07 Ministry of Works

298 Constr. Of Taura-Garki Road 400,000.00 400,000.00 - Ministry of Works

299

Proposed Relocation of water supply facilities affected by Kanya-Duzau-Goron Maje Feeder Road

Project 2,787,750.00 2,751,000.00 36,750.00 Ministry of Works

300 Proposed Repairs of Kwanar yalleman-Kaugama-Kwanar madana Road 54,230,613.60 35,906,265.73 18,324,347.87 Jirma

301 Proposed Rehabilitation of Takur Jaudi Feeder Road (2019 Flood) 9,442,085.63 6,451,728.00 2,990,357.63 Jirma

302 Proposed Construction of Reinforced block line and culvert at Sha'iskawa Takur Site 24,938,937.50 24,680,291.36 258,646.14 Jirma

303 Proposed Maintenance of Ayama Junction-Ayama Feeder Road 63,005,166.47 62,244,441.17 760,725.30 Jirma

304 Proposed Construction of Shagari Quarters-Burtilan-Three Star junction Road (2.0km) 300,097,007.94 294,311,528.94 5,785,479.00 Ministry of Works

305 Proposed Construction of Additional 3 Cell Box culvert along Hantsu Miga Dangyatum Road 43,364,604.94 43,364,604.94 - Jirma

306 Proposed reclamation and Construction of Drainage at IGGI town in Birnin Kudu LGA 25,790,264.43 25,790,264.43 - Jirma

307

Proposed Maintenance and Rehabilitation of Multi Cell Box Culvert Along Karnaya-Chai Chai- Ringim

road at Sintilmawa 7,196,462.98 7,196,462.98 - Jirma

308

Proposed Maintenance and Reconstruction of Section Damaged by 2018 Flood Along Kwalam-Gilima-

Kiri Road 197,729,725.73 199,672,807.59 (1,943,081.86) Jirma

309 Proposed Stand alone solar street lighting project at elleman town in Kaugama LGA 17,708,414.54 17,474,625.00 233,789.54 Ministry of Works

310

Construction of Hadejia Township Roads Projects at Azare Road-Adua Mosque-New Motor Park

(Road 11) (additional works) 324,613,275.50 312,270,011.94 12,343,263.56 Ministry of Works

311 Construction of Hadejia Township Roads projects Additional Works (485M Road Network (road 10) 109,988,511.26 97,645,247.70 12,343,263.56 Ministry of Works

312 Proposed Maintenance of Generating Set at Dutse International Airport 928,500.00 863,500.00 65,000.00

Dutse International

Airport

313 Proposed Relocation of Water supply facilities affected by the township roads poject in 744 Dutse 12,634,075.00 11,704,856.86 929,218.14 Ministry of Works

314 Proposed Relocation of Water supply facilities affected by the township roads project in kiyawa 12,739,349.00 12,043,954.33 695,394.67 Ministry of Works

315 Proposed Maintenance of Birnin Kudu-Kiyawa Road 14,644,282.17 14,644,282.17 - JIRMA

316 Proposed Maintenance of failed sections along Kazaure-Roni Asphaltic Concrete Road 113,701,901.25 98,528,040.30 15,173,860.95 JIRMA

317 Proposed Maintenance of Failed Spots and Potholes on Hadejia Gujungu Road 4,328,047.50 4,328,047.50 - JIRMA

318 Proposed Maintenance of Fail section of unguwar mani-Korayel Surface Dressiing Road 18,315,665.65 18,315,665.65 - JIRMA

319

Proposed Reclamation of Reinforced concrete block drainage (2000M) Access Slabs and Culverts at

Gunka Along Sukullifi-Gunka Road Jahun 48,289,386.35 47,762,386.35 527,000.00 JIRMA

320 Proposed Repairs of NYSC Orientation Camp Generator, Dutse 3,174,906.57 1,977,397.29 1,197,509.28 Ministry of Works

321

Proposed Relocation of Electrical Installations (KEDCO) Affected by Roads Project ( Construction of

Birnin Kudu-KwanGwara-Zaziga Feeder Road 681,000.00 586,000.00 95,000.00 Ministry of Works

322 Proposed Repairs of 8No. Fire Fighting trucks 6,729,000.00 6,172,250.00 556,750.00 Fire Services

323 Proposed Drilling of 150MM PVC Borehole with reticulation of 90MM PVC of 2KM Distance 7,100,423.40 6,734,650.13 365,773.27 Fire Services

324 Proposed Procurement of Working Materials 3,485,920.00 3,300,500.00 185,420.00 Fire Services

325 Proposed maintenance works of very high frequency OMINI Directional Radio (VOR) Shelter 1,059,148.50 1,059,148.50 -

Dutse International

Airport

326

Proposed reclamation of eroded road embankment, re-dressing of shoulder stone pitching and

construction of Chutes and Kerbs at Jangargari-babaldu-Sagu road 3,483,186.00 3,359,706.00 123,480.00 JIRMA

Directorate of Economic Empowerment -

327 Proposed Upgrading of Babura Skills Acquisition and Training Center 8,596,891.21 11,263,571.41 (2,666,680.20) Directorate of Econ. Emp.

328 Proposed Procurement of (10No) Boxer Bajja Motorcycle 2,900,000.00 2,900,000.00 - Directorate of Econ. Emp.

329

Proposed Procurement of Consumable training materials of Mafita (DFID) Programme in 13No. Skills

Acquisition Center 21,014,450.00 20,378,263.50 636,186.50 Directorate of Econ. Emp.

330 Proposed Procurement of (14no.) 6 Water Pump and Solar Pump 6,640,000.00 6,640,000.00 - Directorate of Econ. Emp.

-

MINISTRY OF LAND & HOUSING -

331 Proposed procurement of furniture and at deputy governor's residence 44,790,300.00 34,868,641.50 9,921,658.50 Min of Land

332 Proposed renovation of deputy Governo'rs Residence 18,182,740.96 17,581,763.41 600,977.55 Min of Land

333

Construction of 30No Boys Quarters External Electrification & Water supply to Individual

Legislators Quarters Dutse (generator house) 4,967,578.00 4,967,578.00 - Min of Land

-

CABINET OFFICE -

334

Proposed Constr/Renovation of juma'at Prayer Mosques (First Quarter 2019 Constituency

Projects) 49,605,136.99 51,473,514.64 (1,868,377.65) Cabinet Office

335

Proposed Constr. Of Juma'at Prayer Mosque at Oliya Sararin Rakuma Quarters Hadejia Constituency

First Quarter 2019 Constituency Projects) 5,804,760.56 5,940,460.38 (135,699.82) Cabinet Office

336 Proposed Constr. Of Juma'at Prayer Mosques (4no.) at Birniwa, Gagarawa and Buji) 41,773,970.56 42,013,131.72 (239,161.16) Cabinet Office

337

Partial works (constr of main mosque lower level roof slab) at K/Hausa mosque 2018 2nd qtr

Constituemcy project (change of scope) 4,772,560.00 4,047,154.00 725,406.00 Religious Affairs

338 -

339

Proposed Construction, Completion and Renoovation of juma'at and Daily Prayer Mosque for First

Quarter 2019 Constituency Project (13no) 69,483,551.42 68,104,946.96 1,378,604.46 Cabinet Office

340

Proposed Construction / Completion and Renovation of Friday Prayer mosque / Five Daily Prayer

Mosque for First Quarter 2019 Constituency Projects (6no) at hadejia and K/kasamma 24,550,734.62 24,081,611.13 469,123.49 Cabinet Office

341 Proposed Construction of juma'at Prayer Mosques for first Quarter 2019 Constituency Projects at Maigatari 15,688,829.50 15,486,967.52 201,861.98 Cabinet Office

342

Proposed Renovation/Upgrading of District Head House and Renovation of Juma'at Prayer Mosque

for First Quarter 2019 Constituency Projects at Babura and Yankwashi 33,666,807.87 29,625,345.03 4,041,462.84 Cabinet Office

343 Proposed repairs of (7No) Commands Operational Vehicles NSCD Corps Jigawa State Command 7,133,500.00 6,515,000.00 618,500.00 Special Services

344

Proposed Construction of Borehole with Dwarf tank for Additional Works of Juma'at Prayer Mosque

(JIBWIS) at Garin Gabas in Malam Madori Constituency for third Quarter 2018 Remaining Works 700,000.00 700,000.00 - Cabinet Office

345 Proposed Construction of Female mosque at Federal university Dutse 41,271,654.26 57,137,963.58 (15,866,309.32) Cabinet Office

346 Proposed Renovation of Jigawa State hisbah command Office at Dutse 6,010,416.76 6,001,925.14 8,491.62 Special Services

347

Proposed Additional works for the supply of carpet, generator Sound System and Mumbari at

Nasarawa Jibwis Moque Prayer in Gumel 681,712.50 671,215.50 10,497.00 Cabinet Office

348

Proposed Additional works for the construction of imam zoffice on the construction of wall fencing

and interlocking at Nasarawa Jibwis Mosque in Gumel 678,005.00 669,186.00 8,819.00 Cabinet Office

-

MINISTRY OF INFORMATION -

349 Proposed Procurement of Electrical Equipments 23,699,999.00 18,049,500.00 5,650,499.00 JTB Dutse

350

Proposed Construction of 1No Town Hall at Tsohuwar Gwaram LGA for First Quarter 2019

Constituency Projects 36,295,490.03 36,182,900.04 112,589.99

Ministry of

Information

351 Proposed Renovation works at Hadejia Township Stadium 5,291,054.31 5,589,226.28 (298,171.97) Sport Council

352 Proposed renovation of storm damage and Construction works at Dutse township Stadium 9,863,713.33 9,863,713.33 - Sport Council

353 Proposed Rehabilitation of Guyed wire and others at Andaza Mast 44,707,950.00 40,770,450.00 3,937,500.00 JTV

GOVERNMENT HOUSE -

354 Supply of 2no. fairly used 2018 and 2016 Totota Landcruiser Jeeps 42,000,000.00 44,100,000.00 (2,100,000.00) Government House

355 Supply of 2no. fairly used 2015 and 2016 Totota Landcruiser Jeep 36,000,000.00 37,800,000.00 (1,800,000.00) Government House

356 Proposed Price of 2 No. GS 8 and 13no GS 4 vehicles or its equivelent 169,533,611.20 169,533,611.20 - Government House

-

MINISTRY FOR LOCAL GOVERNMENT -

357 Proposed Rehabilitation of 33KVA line from Sara-Gantsa Buji LGA 45,522,200.75 46,445,750.14 (923,549.39) Min for LG

MINERAL RESOURCES -

358 Proposed conduct of Baseline Survey of Artisanal Miners/Acivities in 14 LGAS in the State 4,884,000.00 4,546,800.00 337,200.00 Mineral Resources Dev

-

OFFICE OF THE DEPUTY GOVERNOR -

359

Proposed price of items to be distributed to N-Tech Trainees Under the N-Power Skills development

Across the State 23,500.00 23,500.00 -

Special Intervention

Program

360

Proposed Price of Items to be Distributed to N-Tech Trainees Under the N-Power Skills Development

Across the State 6,322,000.00 8,154,562.50 (1,832,562.50) Deputy Govt Office

361

Proposed Procurement of Furniture and Equipments at Deputy Governors Residence (additional

works) 9,897,500.00 8,750,175.00 1,147,325.00 Deputy Govt Office

-

MINISTRY OF ENVIRONMENT -

362 Proposed Construction of drainages across the state (2019 first qtr. Constituency) 57,845,636.72 57,340,033.63 505,603.09 Ministry of Environment

363 Proposed for the Repairs of Gully Emptier (911 lorry truck) 1,250,000.00 1,095,000.00 155,000.00

Ministry of

Environment

364

Proposed Procurement of items to be distributed to the community organizations as Government

support for the clearance of typha and other Aquatic weeds along the Riverine Areas (Revised Scope) 15,173,813.00 15,173,813.00 -

Ministry of

Environment

365 Proposed Construction of Drainage at Tsirma Town in Kiyawa Local government Area 44,880,680.25 44,880,680.25 -

Ministry of

Environment

366 Proposed Construction of Drainage at Fankan Fayau Pond in Taura LGA 66,232,100.77 65,917,579.77 314,521.00

Ministry of

Environment

367 Proposed constr of Drainages across the state 47,326,454.83 47,218,265.69 108,189.14

Ministry of

Environment

368

Proposed production of 2.5 million assorted seedling (supply of materials)

14,568,775.00 17,927,142.19 (3,358,367.19)

Ministry of

Environment

369

Proposed Procurement of items to be Distributed to the community organizations as government

support for the clearance of typha and other Aquatic weeds alone the reverine areas 6,338,925.00 6,338,925.00 -

Ministry of

Environment

370 Proposed construction of drainage and repairs of wall fencing of inuwa Dutse housing Estate 43,935,657.85 43,533,566.82 402,091.03

Ministry of

Environment

-

MINISTRY OF JUSTICE -

371Proposed Construction of (8No)New Sharia court at Gumel Kazaure Garki Chamo Baturiya Yalo

Hadejia and Garun Gudunya

178,348,359.52 189,105,452.24 (10,757,092.72) Sharia Court of Appeal

372 Proprosed procurement of Equipment/Furnitures 2,000,000.00 1,980,000.00 20,000.00 Judicial Serv Commison

373 Proposed repairs of 3no Vehicles 412,000.00 412,000.00 - Justice Sector

374

Proposed Renovation of Chief Magistrate Official Residence Kafin Hausa, Construction of Magistrate

Court at Ringim and Construction of 4 Bedroom Duplex at Highbrough Dutse 52,748,575.72 51,713,779.52 1,034,796.20 Ministry of Justice

375 Proposed construction of conference hall at Judicial Services Commission Secretariat Complex 17,403,651.04 17,963,823.37 (560,172.33) Judicial Serv Commison

376 Proposed Procurement of Vehicles 62,000,000.00 62,000,000.00 - State Judiciary

377 Proposed Renovation of 12No. Sharia court 81,685,950.61 78,783,875.00 2,902,075.61 State Judiciary

378 Proposed Procurement of 2no Utility Vehicle 29,385,300.00 29,385,300.00 -

Judicial Service

Commission

379 Proposed procurement and supply of law books to Ministry of Justice 18,984,750.00 18,984,750.00 - Ministry of Justice

380

Proposed Construction of Perimter wall fence at Proposed site for the Construction of Prison along

Limawa-warwade road-Dutse LGA 205,020,293.66 191,928,817.44 13,091,476.22 Ministry of Justice

381

Proposed Procurement of Computer, Library Management System Software and Network

configuration to Ministry of Justice 2,965,000.00 2,798,250.00 166,750.00 Ministry of Justice

-

MINISTRY OF AGRICULTURE -

382 Proposed Construction of Abattoir at Doko in garki Local government Area 9,935,055.96 10,219,945.22 (284,889.26) Min of Agriculture

383 Proposed renovation of JASCO Stores (12no.) 7,288,801.52 6,241,390.57 1,047,410.95 Min of Agriculture

384

Proposed Procurement of Animal vaccines, vaccination inputs and accessories for 2019/2020 annual

vaccination exercise 7,396,000.00 7,217,000.00 179,000.00 Min of Agriculture

385 Proposed Renovation of JARDA Headquater, Dutse 9,966,385.80 9,822,858.22 143,527.58 JARDA

386

Proposed Renovation and Alteration of office Block to Accommodate Staff of Islamic Development

Bank (IDB) Project at JARDA Premises 17,527,798.25 17,320,419.03 207,379.22 JARDA

387 Proposed Renovation of States Zonal Veterinary Clinics (3no.) at Ringim, Jahun and Gumel 15,740,457.72 20,256,382.14 (4,515,924.42) Min of Agriculture

-

HEAD OF SERVICE -

388 Proposed Supply and Installation of 10KVA Inveter Solar Power 6,271,986.00 5,278,696.50 993,289.50

Contributory Pension

Scheme

389 Proposed procurement of brand new ATIZ Book Drive pro book scanner machine 6,800,000.00 6,800,000.00 - Library Board

390 Proposed supply and Instalation of 10KVA inveter solar power 6,271,956.00 5,278,696.50 993,259.50

Contributory Pension

Scheme

391 Proposed Procurement of books 9,200,000.00 9,104,800.00 95,200.00 State Libry

MINISTRY OF COMMERCE -

392 Proposed Procurement of tourism Promotional Equipment and Printing of Tourist Guide handBook 990,000.00 990,000.00 - Min of Commerce

393 Proposed Procurement of e-Registration facilities for business premises and Cooperative Societies 1,774,122.00 1,597,176.00 176,946.00 Min of Commerce

394 Proposed Procurement of ICT Equipment & Accessories 2,740,000.00 2,795,000.00 (55,000.00) Min of Commerces

395 Proposed Renovation of 8No Structures at export Processing Zone Maigatari 13,016,137.90 12,738,100.79 278,037.11 Min of Commerce

396

Proposed Construction of 2no Parking Shades at Babura Motorpark and Achaba in Babura

Constituency for First Quarter 2019 Constituency Projects 2,104,005.85 2,097,097.03 6,908.82 Ministry of Commerce

-

MINISTRY OF FINANCE AND ECONOMIC PLANNING -

397 Proposed procurement of ICT Equipments for Tax Payeers Registration office 1,339,000.00 1,185,000.00 154,000.00

Board of internal

Revenue

398 Proposed construction of Hisbah commandant General Residence at Dutse 8,602,278.14 8,646,067.31 (43,789.17) Min of Finance

399 Proposed price of some office equipments 2,282,500.00 2,205,500.00 77,000.00 Min of Finance

400 Proposed Minor Renovation at Kazaure Zonal Office for the Proposed Driving Lincence centre 580,000.00 566,278.55 13,721.45 Board of Int Rev

MINISTRY OF WOMEN AFFAIRS -

401

Proposed Supply & Installation of (10No) Integrated Stand Alone Solar at Dankwambo in Maigatari

LGA 4,668,004.84 4,378,500.00 289,504.84 Alternative Energy Fund

402 Proposed procurment of office equipments and furniture 2,448,000.00 2,369,000.00 79,000.00 Min of Women Affairs

403 Proposed procurement of office equipments and furnitures 2,448,000.00 2,369,000.00 79,000.00 Min of Women Affairs

404 Proposed repairs of 3No Vehicles 1,202,100.00 1,009,600.00 192,500.00 Min of Women Affairs

CIVIL SERVICE COMMISSION -

405

Proposed renovation of office block and extension of existing conference hall at Jigawa State Civil

Services Commission Office 8,782,384.13 7,980,091.30 802,292.83

Civil Service

Commission

-

TOTAL 14,727,910,392.66 14,520,849,570.67 207,060,821.99

SECTION ( D )

CONTRACTS AWARDED

JANUARY TO DECEMBER, 2019

S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT (N) EXECUTING MINISTRIES COMP. PERIOD

works

1 31/01/2019

Construction for the construction of health post at Tashena Village in Malam Madori Local

Government Area. FGPC/2/2019/VOL.I/7 DALARI CONSTRUCTION 7,543,976.80 Min of Health 8 Weeks

2 31/01/2019

Renovation works (2019 Phase I) Constittuency Project at Haya PHC and Gamji Health post in

Fagam Constituency, Gwaram Local Government Area. FGPC/1/2019/VOL.I/7 GIDAN ADEDE GENERAL 12,468,995.04 Min of Health 8 Weeks

3 19/3/2019

Construction of 1No. Block of 4No. House of 2No. Bedroom Semi-Detach (Lot-3) at Birniwa

Locl Government Area FGPC/15/2019/VOL.I/7 MWT Real Estate & General 10,424,245.65 Min of Land 14 Weeks

4 6/3/2019

Construction of 1No Block of health Post at Askandu Village in Kaugama Local Government

Area FGPC/7/2019/VOL.I/6 Jawad Global Construction 7,543,976.80 Min of Health 12 Weeks

5 19/3/2019 Construction of New Special Hospital at Hadejia Phase I (Additional Works) FGPC/131/2017/VOL.I/22 Philko Limited 274,639,176.32 Min of Health 2 Month

6 14/1/2019 Construction of Health Post at Waza Viillage in Birnin Kudu Local Government Area FGPC/941/2018/VOL.I/4 Ngaloma Construction 7,543,976.80 Min of Health 12 weeks

7 5/3/2019 Construction of 50No Hand Pumps Boreholes at 50 Communities Across the State FGPC/5/2019/VOL.I/6 Sir Walter & Gen Serv 36,897,000.00 Min of Water Resources 16 weeks

8 20/06/2019 Construction of block line drain and Filling of Low Area in Majia Community of taura LGA JEC/37/2019/VOL.I/6 Ummukhulsum Invest 86,485,008.42 Ministry of Works 6 month

9 31/05/2019

Construction of 2No. New Solar Powered Water supply Schemes at Malarin Gamm in Malam

Madori Local Government Area and Walawa in Birniwa Local government Area Hadejia Zone FGPC/33/2019/VOL.I/6 BSY Industries Nig Ltd 12,046,650.00 Ministry of Water Resources 8 weeks

10 31/05/2019 Rehabilitation of 17no. Small towns water supply schemes at hadejia and jahun Zone FGPC/34/2019/VOL.I/6 BSY Industries Nig Ltd 5,161,739.63 Ministry of Water Resources 8 weeks

11 7/3/2019

Construction of 45No Hand Pumps Boreholes Water Supply to 45No Community at

Babaduro, Gigar, Hazo, Unguwar Duna, Unguwar Naino Fulani, Wada, unguwar Tsamiya,

Tudun Bayal, Janzomo, Kaikajo, Maizuwo, Yanmaulu, Mara, Kuldu A Malle, Matuntu, Gareji,

Fulanin Kutumbi, Gandore, Fulanin Kandi, Shashatu, Cirimbin, Gumuzu,Arkel, Akula

Quarters, Unguwar Sani, Yantuba, Waje Gari, Kandiren Fulani, Unguwar Mayau, Middle East,

Karambanin Na Binni, Rahar Yusuf, Amsharawa Fulani, Gujguru Fulani, Burukun Fulani,

Mudiri Fulani, Luggar Unguwar Turewa, Tirewa, Kurgun, Gagarawa, Sankarawa, Tasawa,

Gangar Fulani, Bodawa G/Gurgu Danniya and Sayawa G/Mal, Ali Mai Rogo in Babura Local

Govt Area FGPC/8/2019/VOL.I/6 Safah & Fresh Ltd. 33,207,300.00 Min of Water Resources 16 weeks

12 19/3/2019

Construction of 1No. Block of 4No. House of 2No. Bedroom Semi-Detach at Kazaure Local

Government Area FGPC/13/2019/VOL.I/7 Al-Sabur Global Links 10,779,821.20 Min of Land 14 Weeks

13 19/3/2019

Construction of 1No. Block of 4No. House of 2No. Bedroom Smi-Detach at Gumel Locl

Government Area FGPC/10/2019/VOL.I/7 Yalwa Oil & Gas Ltd 10,773,337.15 Min of Land 14 Weeks

14 19/3/2019

Construction of 1No. Block of 4No. House of 2No. Bedroom Smi-Detach at Ringim Locl

Government Area FGPC/14/2019/VOL.I/7 Al-Sabur Global Links 10,779,821.20 Min of Land 14 Weeks

15 19/3/2019

Construction of 1No Block of 4No House of 2No Bedroom Semi-Detach at Babura Local

Government Area FGPC/9/2019/VOL.I/7 Yalwa Oil & Gas Ltd 10,773,337.15 Min of Land 14 Weeks

16 19/3/2019

Construction of 1no Block of 4No House of 2No Bedroom Semi-Detach (lot-2) at Birnin Kudu

Local Government Area FGPC/16/2019/VOL.I/7 Babandoki General Enterprises 10,651,650.00 Min of Land 14 Weeks

17 19/3/2019

Construction of 1No Block of 4No House of 2No Bedroom Semi-Detach (Lot-6) at Hadejia

Local government Area FGPC/17/2019/VOL.I/7 Ngaloma Construction 10,719,537.18 Min of Land 14 Weeks

Bal.C/F 558,439,549.34

1

S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT (N) EXECUTING MINISTRY COMP. PERIOD

BAL. B/F 558,439,549.34

18 19/3/2019

Construction of 1No Block of 4No House of 2No Bedroom Semi-Detach (Lot-9) at Malam

Madori Local government Area FGPC/18//2019/VOL.I/7 Ngaloma Construction 10,719,854.25 Min of Land 14 Weeks

19 19/3/2019

Construction of 1No Block of 4No House of 2No Bedroom Semi-Detach (Lot-4) at Dutse Local

government Area FGPC/11/2019/VOL.I/7 Loyalty Properties Ltd 10,582,286.69 Min of Land 14 Weeks

20 16/4/2019

Construction of 1no Solar Powered water supply scheme at Nafara in Kiyawa LGA, Dutse

Zone FGPC/26/4/2019/VOL.I/6 Sims Global Resources 6,023,325.00 Ministry of Water Res 8 weeks

21 16/4/2019

Construction of 4No. Solar Powered Water supply scheme at Danmarke, Wada,Kayarda and

Garin Baki in Babura LGA Ringim Zone FGPC/25/2019/VOL.I/6 Sims Global Resources 24,093,300.00 Ministry of Water Res 12 Weeks

22 16/4/2019 Construction of 1No. Solar Powered Water Supply Scheme at Dora in Garki LGA Ringim Zone FGPC/27/2019/VOL.I/6 Sims Global Resources 6,023,325.00 Ministry of Water Res 8 Weeks

23 31/5/2019

Rehabilitation of 2No Small Towns water supply schemes at Yandamo and Malam Baki in

Gumel Zone FGPC/35/2019/VOL.I/8 Forte Technical Services Ltd 8,482,573.26 Ministry of Water Res 8 weeks

24 8/5/2019

Construction of 6No Hand Pump Boreholes water supply scheme at Yandamo Kulle 2,

umarni, Modoji Babba, Fulanin Riggade, Gidan Hardo Musa ( Fulanin Asayaya) in Sule

Tankarkar Local Government Area and Tamburawa in Kafin Hausa LGA FGPC/30/2019/VOL.I/6 K-Manu Gen Construction 4,427,640.00 Ministry of Water Res 12 weeks

25 8/5/2019

Construction of 12No Hand Pump Boreholes water supply schemes at Sule Fulanin Yandamo

( Gidan Mallam) Fulanin Kwalawa( Gidan Kato dan Goma), Fulanin dan Kiri ( Gidan Dan Bako)

Garin Goto, Fulanin Kukule Gabas ( Gidan Isah Kato) Fulanin Malam Kadiri ( Gidan Sale),

Fulanin Dantuwo ( Gidan Ingire), Dan Adama Gari, Fulanin Dan Adama ( Gidan Abdullahi),

Dankira, Sabon Garin Dankirya and Fulanin dan Kumbo ( Gidan Hardo Kan Doki) in Sule

Tankarkar Local Government Area Gumel Zone. FGPC/29/2019/VOL.I/6 Al-Juraj Synergy Concept 8,855,280.00 Ministry of Water Res 12 weeks

26 28/06/2019

Construction of (1No.) Block of Twenty (20) Rooms Students Hostel at Jigawa State Intitute

of Information Technology kazaure JEC/40/2019/VOL.I/7 Babandoki General Enter 47,989,101.98 Ministry of Education 16Weeks

27 21/06/2019 Renovation of Structures at Government Science Secondary School Lautai Gumel ( Phase II) JEC/39/2019/VOL.I/6 Gerawa Gobal Engr Ltd 98,014,279.51 Ministry of Education 6 month

28 8/5/2019

Construction of 15No. Hand Pumps Boreholes water supply scheme at Sinti, Garin Goshi,

Fulanin Masama ( Hardo Tamabya) Dantuwo Gari, Dantuwo Tsangaya, Tashar Bala

S/Tankarkar, Balarabe Mai Gari, Fulanin Jalko( Gidan Rabiu) Hardo Dan Kawo ( Fulanin Kuka

Maidire), Sabon Garin Dan Yarda, Fulanin Dan Banki ( Gidan Sha'aibu Jikan Hajja), Fulanin

Tiriki ( Hardo Ilu), Fulanin Charko(Gidan Dabbi) and Ma'azu Gidan Salisu Tifa in Sule

Tankarkar Local Government Area, Gumel Zone FGPC/28/2019/VOL.I/6 Al-Kawakeb Global Concept 11,069,100.00 Ministry of Water Res 12 weeks

29 13/6/2019

Printing of 2019 Basic Education certificate examination (BECE) question papers with answer

sheets for JSS Across the State JEC/52/2019/VOL.I/7 Clear Impressions Ltd 15,260,680.05 Ministry of Education 8 weeks

30 10/7/2019 Rehabilitation of ITC line from Kwanar Gawo to Hago in Kafin Hausa Local Government Area JEC/44/2019/VOL.I/5 Tasiu Muhammad Invest Ltd 8,333,050.69 Ministry of Works 8 weeks

Bal.C/F 818,313,345.77

2

S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT (N) EXECUTING MINISTRY COMP. PERIOD

BAL. B/F 818,313,345.77

31 8/5/2019

Construction of 22No Hand Pump Boreholes water supply schemes at Yandamo gari A,

Yandamo Gari B, Garin Yasai, Hardo Jauro, Kargo, Fulanin Lula, Madoji Tsalle, Fulanin

Barnawa Fulanin Bayan Eka STK, Fulanin Santarbi, Dangoho, Fulanin Mai Rago ( Yamma)

Buntusu Fulani, Fulanin Hardo Musa S.Tankarkar Fulanin Kurguna, Fulanin Kaina unguwar

Yamma ( Danzomo) in Sule Tankarkar LGA and Kwanar Tsuru, Garin Kwalandi, Garin Malam,

Gabasawar Kwalandi and Fulanin Shabarawa ( Gidan Ibrahim Bidu) in Maigatari LGA FGPC/31/2019/VOL.I/6 Forte Technical Services Ltd 16,234,680.00 Ministry of Water Res 12 weeks

32 15/07/2019

Re-Construction of the damaged sections of Abunabo-Kadira-Guri Road (Phase-III of Eastern

Bye Pass) JEC/45/2019/VOL.I/6 CGC Nig Ltd 50,000,000.00 Ministry of Works 10 weeks

33 6/9/2019 Renovation works at Deputy Governor's Official Residence, Dutse DGO/PRJ/003/V.I/17 Daniya Atiku Associate Ltd. 17,129,210.40 Cabinet Office 12 weeks

34 1/7/2019 Contract for the supply & Installation of Medical Equipment to Ringim General Hospital JEC/42/2019/VOL.I/7 Dagarai Integrated Srv 82,153,507.50 Min of Health 8 weeks

35 30/07/2019

Rehabilitation of Karshi-Gagarawar Karshi ITC Line and Extension of Farin Gida TDN in

Ringim Local Government Area, Rehabilitation of Yandutse-Malamawar Yandutse ITC in

Ringim LGA JEC/46/2019/VOL.I/6 Almajeed Constr Ltd 11,391,654.86 Min of Works 10 weeks

36 10/7/2019 Re-construction of fallen wall fence at GGUSS Garki and GUSS M/Madori JEC/54/2019/VOL.I/6 Pullad Global Consult 9,039,035.07 Ministry of Education 8 weeks

37 9/8/2019

Constr of (38No) Hand Pumps at Makadi'B', Gangara waje, jiji'B' Unguwar Sama, Gidan Hardo

Gawo, Gidan Beti dan Maigari, bodawa C, Unguwar Tsamiya B, GJASS Baura, GGADSS

Babuura, Tsadura, Babura Arewa B, Kaute B, in babura LGA, Dutse Capital School in Dutse,

unguwar Lawan in Jahun, tunubu town in Jahun, kuka in /S/Tankarkar, Gidan Danta Fulani,

Kanawa Aume, dan Amale Fulani, Gage Yamma, Jelawa Damu, Kauyen Fulani HP in babura

LGA, Shamuri HP in S/Tankarkar, Tinubu, Hayin Tara Yamma in Jahun, Burukum Fulani, Gidan

Makeri, Minu, Unguwar Magaji, Batali, Malamawa, Bikawa Batali, Muni A, Gidan Dawa and

Dan Makeri G/Nagawo in babura LGA JEC/53/2019/VOL.I/6 Bulangu Dril l ing 28,041,729.00 Min of Water Resources 14 weeks

38 15/8/2019

Renovation of Storm damages at 7no. Schools across the state : GGASS S/Tankarkar, GUSS

maigatari, GDSS Shagari Qtrs. Hadejia, GSS Aujara, GDSS Buji, GGDSS Birnin Kudu and Dutse

Model Int School. JEC/55/2019/VOL.I/9 AGM & Sons Nig 23,498,908.59 Mininstry of Education 8 weeks

39 16/8/2019

Renovation of storm damages at GDASS Dantanoma in Gumel LGA, School of Arabic and

Islamic Studies (SAIS) Hadejia, GDASS Zainab Kazaure, GDASS Dabi in Ringim, GDASS

Gwaram and GGASS Danzomo in Gagarawa LGA JEC/56/2019/VOL.I/10 Pullad Global Consult 53,582,692.89 Ministry of Education 16 weeks

40 6/8/2019

Upgrading and Conversion of 1No. Motorixzed water supply scheme to solar powered at

Maizuwo in Sule tankarkar LGA FGPC/50/2019/VOL.I/6 Sims Global Resources 6,829,987.50 Min of Water Resources 4 weeks

41 6/8/2019

Upgrading and Coversion of 1No. Motorized water supply scheme to solar powered to

Gangara in Babura LGA FGPC/51/2019/VOL.I/6 Sims Global Resources 6,829,987.50 Min of Water Resources 4 weeks

Bal.C/F 1,123,044,739.08

3

S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT EXECUTING MINISTRIES COMP. PERIOD

(N)

BAL. B/F 1,123,044,739.08

Works

42 2/10/2019 2019 Rural Electrification Project at Kulawa in Ringim LGA (Lot-9) JEC/71/2019/VOL.1/17 Ngloma Constr Nig Ltd 40,761,674.94 Min of Works 14 weeks

43 2/10/2019 2019 Rural Electrification Project at Kaigamari M/Awaso in K/Hausa LGA (Lot-7) JEC/72/2019/VOL.1/17 Babandoki Gen Entp. 56,156,069.34 Min of Works 14 weeks

44 2/10/2019 2019 Rural Electrification Project atTurbus in Maigatari LGA (Lot-8) JEC/73/2019/VOL.1/17 Babandoki Gen Entp. 51,909,858.00 Min of Works 14 weeks

45 2/10/2019 2019 Rural Electrification Project at Daurawa in Taura LGA (Lot-11) JEC/75/2019/VOL.1/17 Ngloma Constr Nig Ltd 39,499,187.75 Min of Works 14 weeks

46 2/10/2019 2019 Rural Electrification Project at Batali in Babura LGA (Lot-14) JEC/76/2019/VOL.1/17 Ngloma Constr Nig Ltd 87,414,189.61 Min of Works 14 weeks

47 2/10/2019 2019 Rural Electrification Project at Duwigi in Gwiwa LGA (Lot-13) JEC/74/2019/VOL.1/17 Babandoki Gen Entp. 45,418,689.70 Min of Works 14 weeks

48 2/10/2019 2019 Rural Electrification Project at Ringim in Yankwashi LGA (Lot-12) JEC/70/2019/VOL.1/17 Pullad Global Consultant 59,238,524.45 Min of Works 14 weeks

49 2/10/2019 2019 Rural Electrification Project at Batu in Birniwa LGA (Lot-5) JEC/66/2019/VOL.1/17 Masaka Global Concepts 42,505,703.10 Min of Works 14 weeks

50 2/10/2019 2019 Rural Electrification Project at Walawa in Hadejia LGA (Lot-4) JEC/65/2019/VOL.1/17 Ngloma Constr Nig Ltd 52,780,791.53 Min of Works 14 weeks

51 2/10/2019 2019 Rural Electrification Project at Kadira in Guri LGA (Lot-6) JEC/67/2019/VOL.1/17 Xtrax 99 integrated Services 101,346,796.79 Min of Works 14 weeks

52 2/10/2019 Electrification project (Lot-17) at Gangara Qtr. In Gumel LGA. JEC/78/2019/VOL.1/17 Ibrahim Yusuf Integ. 23,258,058.11 Min of Works 14 weeks

53 2/10/2019 Electrification project (Lot-15) at Masko villege in Babura LGA. JEC/77/2019/VOL.1/17 Nuhabib Nig. Ltd. 32,792,767.93 Min of Works 14 weeks

54 2/10/2019 Electrification project (Lot-2) at Gangawa village in Jahun LGA. JEC/63/2019/VOL.1/17 Yanduna Ventures 90,247,560.30 Min of Works 14 weeks

55 3/10/2019

Constr of 1no. Block of 3-classrooms each at GDSS Babura, GDSS Galagamma Gumel, GDSS

babura and GDSS Ringim Areawa (2019 Capital projects) JEC/79/2019/VOL.1/8 Babandoki Gen Entp. 44,808,022.00 Min of Edcuation 12 weeks

56 3/10/2019

Constr of 1no. Block of 3-classrooms each at GDSS Dan Masara, GDSS Jahun, GDSS Shagari

Qtrs Hadejia and GDSS M/madori (2019 Capital projects) JEC/80/2019/VOL.1/8 Math Global Invest. 44,808,022.00 Min of Edcuation 12 weeks

57 25/09/2019

Renov of Science and ICT Labs. at 9no. Proposed Science Centres of Excellence core 2

(GGUSS M/madori, GDSS G/Gabas, GGSS Garki, GDSS Gwiwa, GUSS Aujara, GUSS Maigatari,

GDSS T/Gwaram, GC Birnin Kudu and GUSS Basirka) JEC/61/2019/VOL.1/6 AGM & Sons Nig Ltd. 24,140,000.00 Min of Edcuation 12 weeks

58 2/10/2019

Constr of hadejia township roads (485m) road Network) Additional works) at Azare road-

Adua Mosque-New Motor Park (Road II) JEC/71/2019/VOL.1/52 PAAche Constr Ltd. 312,270,011.92 Min of Works 16 weeks

59 2/10/2019 Constr of Babura township roads (10.28km) (Additional works) JEC/218/2018/VOL.1/31 Triacta Nig Ltd. 510,841,607.48 Min of Works 16 weeks

60 27/9/2019

Upgrading and Conversion of 1no. Motorised water supply scheme to Solar power at

UKU da SISI Sabuwa in Babura LGA JEC/63/2019/VOL.I/7 Sims Nig. Ltd. 6,767,532.45 Min of Water 8 weeks

61 27/9/2019 Rehab. of 13no. Water supply scheme at Ringim, Kazaure and Gumel LGA JEC/64/2019/VOL.I/7 Sims Nig. Ltd. 12,788,475.00 Min of Water 8 weeks

62 27/9/2019

Constr of (1no.) New Solar powered water supply scheme at YAN Maulu Tsohowu in

Babura LGA JEC/62/2019/VOL.I/7 Sims Nig. Ltd. 6,023,325.00 Min of Water 8 weeks

Bal.C/F 2,808,821,606.48

4

S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT (N) EXECUTING MINISTRIES COMP. PERIOD

BAL. B/F 2,808,821,606.48

63 7/10/2019 Re-construction of B/kudu New General Hospital (Variations) JEC/20/2019/VOL.I/10 Datum Constr. Ltd. 395,712,672.97 Min of Health 16 weeks

64 28/10/2019

Constr of 1no. Block of 3-classrooms each at 8no. GDSS across the state (2019 Capital

Projects) JEC/87/2019/VOL.I/9 Math Global Invest. Ltd. 90,089,432.00 Min of Education 14 weeks

65 11/10/2019

Upgrading and Conversion of 1no. Motorised water supply scheme to Solar powered

atJigawar Dan Ali, Garun Gudunya in Babura LGA and JEKE in S/Tankarkar LGA JEC/81/2019/VOL.I/13 Sims Nig. Ltd. 18,459,647.97 Min of Water 8 weeks

66 11/10/2019 Rehab. of 19no. Water supply scheme in Babura (Ringim zone) JEC/82/2019/VOL.I/13 Sims Nig. Ltd. 17,361,750.00 Min of Water 8 weeks

67 27/11/2019

Renovation of Staff Quarters at College of Education Gumel, Lot-7 (3rd & 4rd Quarter 2019

Capital projects) JEC/117/2019/VOL.I/10 Babandoki General Entr 233,513,402.67 Min of Education 12 weeks

68 27/11/2019

Construction of 1No Block of 2 classroom Islamiyya School each, Lot-4 (First Quarter 2019

Constituency Project) at Dodal (Nomadic and Jammaje Gafaffa in Gwiwa JEC/99/2019/VOL.I/11 Isah Halilu Nig Ltd 6,226,306.20 Min of Education 8 weeks

69 27/11/2019

Construction of classrooms Blocks at Jigawa College of Remedial and Advance

Studies(JICORAS) Babura, Lot-4 (3rd & 4rd Quarter 2019 Capital Projects) JEC/115/2019/VOL.I/10 Babandoki General Entr 120,213,423.86 Min of Education 24 weeks

70 27/11/2019

Construction of 1No Block of 2 Classroom islamiyya School Lot-14B (First Quarter 2019

Constituency Project) at Hassan Hadejia in Hadejia constituency JEC/106/2019/VOL.I/11 Muhal Global Concept Ltd 9,100,200.00 Min of Education 9 weeks

71 27/11/2019

Renovation of 13No Students Hostels at College of education Gumel, Lot-8 (3rd &b 4rd

Quarter 2019 Capital Projects) JEC/118/2019/VOL.I/10 Babandoki General Entr 148,840,065.71 Min of Education 12 weeks

72 27/11/2019

Construction of Hostel Block at Jigawa College of remedial and Advance Studies (JICORAS)

Lot-5 (3rd & 4th Quarter 2019 Capital Projects) JEC/116/2019/VOL.I/10 Ngaloma Constr Co Ltd 100,763,064.17 Min of Education 24 weeks

73 27/11/2019

Construction of 1No. 2 classroom Islamiyya School each, Lot-6 (First Quarter 2019

Constituency Project at Abur, Margadu, Ahlal Sunnah Islamiyya, Musari and Wareri in Guri

Constituency JEC/110/2019/VOL.I/11 Adam General Enter Ltd 15,576,795.40 Min of Education 8 weeks

74 18/11/2019

Construction of 2No Block of 2 Classroom Islamiyya ( 2018 Phase II Ongoing Constituency

Projects) Lot-10 at danksoshe and Jatafinnamari in Buji Constituency JEC/92/2019/VOL.I/6 Mai-Mai Blocks Industry Ltd 6,231,539.60 Min of Education 8 weeks

75 27/11/2019

Construction of 1No Block of 2 Classroom Islamiyya School each Lot-12 (First Quarter 2019

Constituency Project at Kan Hawa Roni, Santar Tsaye and Sabuwar Santa Tunas in Roni

Constituency JEC/104/2019/VOL.I/11 Yanduna Ventures Ltd 9,339,248.04 Min of Education 10 weeks

76 18/11/2019

Construction of 3no Block of 2 classroom Islamiyya ( 2018 Phase III Ongoing Constituency

Projects) Lot-12 at Garin Kwalandi and Kabara in Maigatari Constituency JEC/94/2019/VOL.I/6 NBS & Sons Constr Ltd 15,140,562.72 Min of Education 8 weeks

77 18/11/2019

Construction of Malam Makera Islamiyya School (Upstairs) 2018 III Ongoing Constituency

project (Lot-1S) at Malam Abdullahi islamiyya Hadejia in Hadejia JEC/96/2019/VOL.I/6 Nabakwai General Entr 16,341,041.20 Min of Education 12 weeks

78 18/11/2019

Construction of 1No Block of 2 Classroom Islamiyya (2018 Phase II Ongoing Constituency

Projects) Lot-7 at Guri in Guri Constituency JEC/91/2019/VOL.I/6 Nushe Business Resources 3,115,779.08 Min of Education 8 weeks

Bal.C/F 4,014,846,538.07

5

S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT (N) EXECUTING MINISTRIES COMP. PERIOD

BAL. B/F 4,014,846,538.07

79 18/11/2019

Construction of 2No Block of 2 Classroom Islamiyya (2018 Phase III Ongoing Constituency

Projects ) Lot-7 at Garin Musa and Daneri in Birniwa Constituency JEC/93/2019/VOL.I/6 BDU Ventures Ltd 6,227,358.16 Min of Education 8 weeks

80 14/11/2019

Construction of 1No Block of Science Laboratory and Administrative Block (Lot-1) at GDSS

Kukuma in Buji Constituency project 2019 JEC/88/2019/VOL.I/6 Yayarin Tukur Nig Ltd 22,937,034.15 Min of Education 8 weeks

81 18//11/2019

Construction of 1No Block of 2 classroom Islamiyya (2018 Phase III Ongoing Constituency

Projects) Lot-1B at Maskangayu In Auyo Constituency JEC/90/2019/VOL.I/6 DDN Constr Nig Ltd 3,115,359.08 Min of Education 8 weeks

82 14/11/2019

Construction of 1No Block of 3 classrooms each at GDASS Kiri Kasamma GDASS Bulangu

GDASS Miga GDASS Kiri Kasamma GDASS Bulangu GDASS Miga, GDASS Marma, GDASS

Limawa , GDASS Birniwa and GDASS Aujara JEC/89/2019/VOL.I/8 A.A. Maikatako Gen Entr 78,414,000.00 Min of Education 20 weeks

83 11l12l2019

Constr of 1no. Block of 2-classroom islamiyya school each ( 2019 first quarter phase 2

Constituency projects) Lot-19B at Kunduwaje and Gagura in Gwaram Constituency, JEC/132/2019/VOL.1/7 Nushe Bus, Resources Nig Ltd 6,685,247.76 Min of Education 6 weeks

84 11/12/2019

Constr of 1no. Block of 2-classroom islamiyya school each ( 2019 first quarter phase 2

Constituency projects) Lot-16 at Ramin kura, Juwan, Masaru and Nasarawa in Birnin Kudu

Constituency, JEC/128/2019/VOL.1/7 Nushe Bus, Resources Nig Ltd 12,888,711.92 Min of Education 10 weeks

85 11/12/2019

Constr of Hand Pump Boreholes Water Supply Schemes Constituency projects (2019 First

Quarter) Lot-1 at Fulanin Gamba, Fulanin Garu and Fulanin Kafur in Auyo Contituency. JEC/170/2019/VOL.1/20 AMM Manzo Nig Ltd 2,210,922.00 Min of Water Resources 8 weeks

86 11/12/2019

Constr of Hand Pump Boreholes Water Supply Schemes Constituency projects (2019 First

Quarter) Lot-26 atKankanba, Dodorin Tudu, Hardo Magaji, Mataran, Dalarin Kwalta, Bultuwa

Rigar Gabas, Dodorin Rigar Mal Yakubu, Bultuwa Rigar Kauga, Ung. Jibrin Masallacin Mal.

Kawu and Rigar Dado Gajere In Kaugama Contituency. JEC/184/2019/VOL.1/20 AMM Manzo Nig Ltd 7,377,510.00 Min of Water Resources 8 weeks

87 11/12/2019

Constr of Solar Powered Water Supply Schemes Constituency Project ( 2019 Phase 1) Lot-42

at Kilawa in Fagam Contituency. JEC/163/2019/VOL.1/9 Jignaj Global Contr Ltd 6,023,220.00 Min of Water Resources 8 weeks

88 11/12/2019

Upgradingand Conversation of 1no. Motorised water Supply Scheme (2019 phase1 )

Constituency Project Lot-22 at Zauma in Gwiwa Constituency. JEC/167/2019/vOL.1/9 Jignaj Global Contr Ltd 8,685,075.00 Min of Water Resources 8 weeks

89 11/12/2019

Upgradingand Conversation of 1no. Motorised water Supply Scheme (2019 phase1 )

Constituency Project Lot-23 at Korayalin Gwiwa Constituency. JECl168/2019/VOL.1/9 Jignaj Global Contr Ltd 6,863,325.00 Min of Water Resources 8 weeks

90 11/12/2019

Renov of 2no. Solar Powered water Supply schemes Contituency project ( 2019 Phase 1) Lot-

24 at Gidan Kudege and Kurneji in Gwiwa Constituency JEC/169/2019/VOL.1/9 Jignaj Global Contr Ltd 3,227,700.00 Min of Water Resources 8 weeks

91 11/12/2019

Constr of Solar Powered water Supply schemes Contituency project ( 2019 Phase 1) Lot- 41

at tsallakawa in Fagam Constituency, Gwaram Local Government Area JEC/162/2019/VOL.1/9 Jignaj Global Contr Ltd 6,023,220.00 Min of Water Resources 8 weeks

92 11/12/2019

Constr of Solar Powered water Supply schemes Contituency project ( 2019 Phase 1) Lot- 46

at Garin Urema in Hadejia Constituency JEC/165/2019/VOL.1/9 A+Tech Integrated Nig. Ltd 6,021,855.00 Min of Water Resources 8 weeks

93 11/12/2019

Constr of Solar Powered water Supply schemes Contituency project ( 2019 Phase 1) Lot- 45

at Gawon Dogari in Hadejia Constituency JEC/164/2019/VOL.1/9 Amia Integrated Service Nig Ltd 6,022,485.00 Min of Water Resources 8 weeks

Bal.C/F 4,197,569,561.14

6

S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT (N) EXECUTING MINISTRIES COMP. PERIOD

BAL. B/F 4,197,569,561.14

94 11/12/2019

Constr of Solar Powered water Supply schemes Contituency project ( 2019 Phase 1) Lot- 39

atSabon Gari in Miga Constituency JEC/160/2019/VOL.1/9 Amia Integrated Service Nig Ltd 6,022,485.00 Min of Water Resources 8 weeks

95 6/8/2019

Upgrading and Conversion of Zaburan, Small Town Motorised Water Supply Scheme to Solar

Powered in Kaugama Local Government Area. FGPC/49/2019/VOL.1/7 Sims Global Resources Nig Ltd 16,917,862.50 Min of Water Resources 8 weeks

96 11/12/2019

Constr of Hand Pump Boreholes Water Supply Schemes Constituency projects (2019 First

Quarter) Lot-9 at Askawa, Kulawa Babare, Achau Boro, Lugga Dashi, Tokai Arewa, Ung. M.

Nagoggo, Damutawa, Gabashi, Rinde fulani, Bakin Kasuwa, Ung. Isah Yar Jigawa, Gwamfai

Sabon Gari, Tsangaya, Kulluru Yammaci, Alikau, Sukullufi, Gidan Atiku, Makera, Gwamfai, JEC/177/2019/VOL.1/20 Danfatu & sons Nig Ltd 14,755,650.00 Min of Education 8 weeks

97 27/11/2019

Constr of 1no. Block of 2-Classroom islamiyya school each ( 2019 first quarter phase 2

Constituency projects) Lot-8 at Dansama , Gangara, M. Yaro and Garin Baki in Maigatari

Constituency, JEC/101/2019/VOL1/11 Mai-Mai Block Ind. Ni g Ltd 9,310,318.35 Min of Education 9 weeks

98 27/11/2019

Constr of 1no. Block of 2-Classroom islamiyya school each ( 2019 first quarter phase 2

Constituency projects) Lot-1 at Girdo, Tasawa and Tsamiyar Kwance in Kanya Babba

Constituency Babura Local Government Area JEC/97/2019/VOL.1/12 Dee- Tech Nig Ltd 9,347,337.24 Min of Education 13 weeks

99 27/11/2019

Constr of 1no. Block of 2-Classroom islamiyya school each ( 2019 first quarter phase 2

Constituency projects) Lot-7 at Jauga, Jankawa Yola, Karwai, Wailari and Budai in Ringim

Constituency JEC/100/2019/VOL.1/11 Marb eng. & Multi service Nig Ltd 15,576,585.00 Min of Education 8 weeks

100 27/11/2019

Constr of 1no. Block of 2-Classroom islamiyya school each ( 2019 first quarter phase 2

Constituency projects) Lot-3A at Bukari and Aimas Kuka in Auyo Constituency JEC/98/2019/VOL.1/11 Mai-Mai Block Ind. Ni g Ltd 6,226,518.18 Min of Education 12 weeks

101 27/11/2019

Constr of 1no. Block of 2-Classroom islamiyya school each ( 2019 first quarter phase 2

Constituency projects) Lot-13 at Kiri Hawandu, Katarika and Kawari/Gujungu in Taura

Constituency JEC/105/2019/VOL.1/11 Nushe Bus, Resources Nig Ltd 11,719,771.12 Min of Education 12 weeks

102 11/12/2019

Constr of Solar Powered water Supply schemes Contituency project ( 2019 Phase 1) Lot- 40

at Gidan Barwa in Miga Constituency JEC/161/2019/VOL.1/9 A. Barde Global Concept Ltd 6,023,010.00 Min of Water Resources 8 weeks

103 11/12/2019

Constr of Solar Powered water Supply schemes Contituency project ( 2019 Phase 1) Lot- 4 at

Juba Gandu in Auyo Constituency JEC/137/2019/VOL.1/9 Alh. Umaru Baban Doki Nig Ltd 6,004,715.00 Min of Water Resources 8 weeks

104 11/12/2019

Constr of Water Collection Point 2019 First Quarter Constituency Project (Lot-22) at Yofai,

Tuyau, Gidan Kara, Dagasa, Jiyau, Fulani, Jiyau Babba, Tagwai, Kun Kurawa, Danbaje, Auramo

Gabas Zangon Sallau, Dan Tsiru, Tsurutawa, Auramo Tudu, Gidan Sani, Zabara, Durno, Kuna,

Dara Zai and Bangon Jani in Ringim Constituency. JEC/193/2019/VOL.1/20 Prestige Integ Serv. Nig Ltd 25,206,980.00 Min of Water Resources 8 weeks

105 11/12/2019

Constr of Solar Powered water Supply schemes Contituency project ( 2019 Phase 1) Lot- 39

at Gabari in Malam Madori Constituency JEC/159/2019/VOL.1/9 Prestige Integ Serv. Nig Ltd 6,022,695.00 Min of Water Resources 8 weeks

106 3/12/2019

Constr of additional 1no. Block of 3- Classrooms each at GDSS Kazaure, GDSS Sabon Gida,

GDSS Haruna (Hadejia), GDSS Fagoji, GDSS Galagamma Gumel and GDSS Famfo Goma

Hadejia (2019 MOEST Capital project) JEC/120/2019/VOL.1/6 Al-sabur Global Links Nig Ltd 67,212,333.84 Min of Education 12 weeks

Bal.C/F 4,397,915,822.37

7

S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT (N) EXECUTING MINISTRIES COMP. PERIOD

BAL. B/F 4,397,915,822.37

107 23/12/2019

Constr of Solar Powered water Supply schemes Contituency project ( 2019 Phase 1) Lot- 3 at

Sabuwar Auyo in Auyo Constituency JEC/278/2019/VOL.1/6 A.A Aljazeera Agro Processing Nig Ltd 6,010,515.00 Min of Water Resources 8 weeks

108 17/12/2019

Renov/Completion of 2no. Friday prayer mosques (2019 first Quarter constituency projects)

Lot_91 at Danmakama and Dangwanki In Sule Tankarkar Constituency. JEC/267/2019/VOL.1/25 A.A Aljazeera Agro Processing Nig Ltd 7,331,978.53 Cabinet office 8 weeks

109 11/12/2019

Constr of Hand Pump Boreholes Water Supply Schemes Constituency projects (2019 First

Quarter) Lot-28 at Tashar Yellow, Fulani Cakindi, Turkushawa Gari, Gidan Amadu Inge,

Fulanin Kaina, G. Idi Shiba, Fulanin Hammado, Gidan Dibbo in Sule Tankarkar Contituency. JEC/186/2019/VOL.1/20 A.A Aljazeera Agro Processing Nig Ltd 4,426,695.00 Min of Water Resources 8 weeks

110 17/12/2019

Renov/Completion of 1no. Friday prayer mosques (2019 first Quarter constituency projects)

Lot_82 at Bango in Fagam Constituency. JEC/260/2019/VOL.1/25 A.A Aljazeera Agro Processing Nig Ltd 6,202,006.45 Cabinet office 8 weeks

111 11/12/2019

Constr of Water Collection Point 2019 First Quarter Constituency Project Lot- 19 at Kofar

Kudu Basirka, kofar Yamma Basirka Dal and Kofar Tela Basirka in Fagam Constituency,

Gwaram LGA JEC/190/2019/VOL.1/20 Jignaj Global Contr Ltd 4,876,422.00 Min of Water Resources 8 weeks

112 17/12/2019

Constr of 3no. Daily Prayer Mosques (2019 First Quarter Constituency project) Lot - 49 at

Butiranawa Fulani, Buduru nad Fulanin Bayan Zarga in Taura Constituency. JEC/235/2019/VOL.1/25 Gamdu Multi Purpose Ltd 5,874,753.15 Cabinet office 8 weeks

113 17/12/2019

Constr of 4no. Daily Prayer Mosques (2019 First Quarter Constituency project) Lot - 1 at

Maro, Katangar Tsamiya, Guyu, and Tsurufawa in Auyo Constituency. JEC/197/2019/VOL.1/25 Gamdu Multi Purpose Ltd 7,833,028.20 Cabinet office 8 weeks

114 11/12/2019

Constr of 1no. Block of 2-classroom islamiyya school each ( 2019 first quarter phase 2

Constituency projects) Lot-10B, at Bashuri in Dutse Constituency, JEC/135/2019/VOL.1/7 Al-kheeyad Nig Ltd 3,115,676.00 Min of Education 8 weeks

115 17/12/2019

Constr of 2no. Daily Prayer Mosques (2019 First Quarter Constituency project) Lot - 24 at

Oliya Sararin Rakuma and Lungum Mutari Dankoli in Hadejia Constituency. JEC/217/2019/VOL.1/25 Alh. Umaru Baban Doki Nig Ltd 8,949,483.00 Cabinet office 8 weeks

116 17/12/2019

Completion/Renov. 4no. Daily Prayer Mosques (2019 First Quarter Constituency project) Lot -

57 at Kantin Waje, Tudun Wada, Unguwar NTA and Yankoli in Hadejia Constituency. JEC/243/2019/VOL.1/25 Alh. Umaru Baban Doki Nig Ltd 10,339,715.08 Cabinet office 8 weeks

117 17/12/2019

Constr of 3no. Daily Prayer Mosques (2019 First Quarter Constituency project) Lot - 30 at

Jallomi Arewa, Manak and Kanjiwa in Kaugama Constituency. JEC/220/2019/VOL.1/25 Alh. Umaru Baban Doki Nig Ltd 5,870,866.05 Cabinet office 8 weeks

118 17/12/2019

Constr of 3no. Daily Prayer Mosques (2019 First Quarter Constituency project) Lot - 31

atDaneri, Kanoke and Kota in Kaugama Constituency. JEC/221/2019/VOL.1/26 Alh. Umaru Baban Doki Nig Ltd 5,884,568.55 Cabinet office 8 weeks

119 11/12/2019

Renov of 2no. Solar Powered water Supply schemes Contituency project ( 2019 Phase 1) Lot-

24 at Gidan Kudege and Kurneji in Gwiwa Constituency JEC/169/2019/VOL.1/9 Jignaj Global Contr Ltd 3,227,700.00 Min of Water Resources 8 weeks

120 11/12/2019

Constr of Water Collection Point 2019 First aquarter Constituency Project Lot- 23 at Kauyen

Zarga and Rigarsu Iro Akwai Allah In Taura Constituency JEC/194/2019/VOL.1/20 Nushe Bus, Resources Nig Ltd 2,519,647.20 Min of Water Resources 8 weeks

121 11/12/2019 Constr of Jigawar Dan Ali Township Road (2.10KM) (Additional Work) FGPC/887/2018/VOL.1/51 Mother Cat Nig Ltd 203,412,195.00 Min of Works 16 weeks

122 11/12/2019

Constr of Gwaram Tsohuwa and Gwaram Sabuwa Towns Water Supply Scheme (Additionsl

Works) FGPC/897B/2018/VOL.1/13 Nushe Bus, Resources Nig Ltd 29,520,524.45 Min of Water Resources 12 weeks

Bal.C/F 4,713,311,596.03

8

S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT (N) EXECUTING MINISTRIES COMP. PERIOD

BAL. B/F 4,713,311,596.03

123 23/12/2019

Constr of Toilets, Classrooms, Admin Blocks, Laboratories and Hand Pumps at GDSS Ringim

Arewa, K/Babba, Gujungu, Sakwayya and G/Kuka (2019 Last Quarters MOEST Capital project

Across the state (Lot-1ABCD&E) JEC/290/2019/VOL.1/9 Ngaloma Constr Nig Ltd 103,609,125.68 Min of Education 12 weeks

124 23/12/2019

Constr of Toilets, Classrooms, Admin Blocks, Laboratories and Hand Pumps at GDSS Bosuwa,

Taura, and Gumel (2019 Last Quarters MOEST Capital project Across the state (Lot-3AB&C) JEC/292/2019/VOL.1/9 Babandoki Gen. Enterp Nig Ltd 104,213,888.67 Min of Education 12 weeks

125 27/12/2019

Constr of Classes, Laboratories at GDSS Kafin Hausa, Kadira, Shagari, Dakido, Kanti, Roni,

Danmasara, Kudai, Birnin Kudu, Malamadori and Kiyawa (2019 Last Quarters MOEST Capital

project Across the state (Lot-5ABC&D) JEC/315/2019/VOL.1/9 Sabon Garin yaya Nig Ltd 106,186,110.20 Min of Education 12 weeks

126 27/12/2019

Constr of Toilets, Classrooms, Admin Blocks, Laboratories and Hand Pumps at GDSS Galadi,

GDSS Marabusawa, GDSS Dakido (2019 Last Quarters MOEST Capital project Across the state

(Lot-4AB&C) JEC/314/2019/VOL.1/9 Math Global Invt. Nig Ltd 104,338,846.77 Min of Education 12 weeks

127 27/12/2019

Constr of Toilets, Classrooms, Admin Blocks, Laboratories and Hand Pumps at GDSS

Danzomo, GDSS Abdulkadir, and GDSS Babaldu (2019 Last Quarters MOEST Capital project

Across the state (Lot-7AB&C) JEC/317/2019/VOL.1/9 Pullad Global Consultant Nig Ltd 114,843,483.25 Min of Education 12 weeks

128 27/12/2019

Constr of Toilets, Admin Blocks, Laboratories and Wall Fence, 7no. JSQ Eamination Hall and

additional course of Blocks Hand pumps at GDSS Kazaure, Dutse Capital, Bamaina Academy,

Dutse Model and GDSS Jabo (2019 Last Quarters MOEST Capital project Across the state (Lot-

6 ABCDE&F) JEC/316/2019/VOL.1/9 Pullad Global Consultant Nig Ltd 109,273,620.31 Min of Education 12 weeks

129 23/12/2019

Constr of Admin. Block, 21 Laboratories, Computer Lab. And 3-Blocks of 12 Classrooms at

Mega School Dutse (2019 Last Quarter MOEST Capital projects) Across the State (Lot-8 ABC &

D) JEC/297/2019/VOL.1/9 Babandoki Gen. Enterp Nig Ltd 224,397,873.13 Min of Education 12 weeks

130 17/12/2019

Constr of 1no Friday Prayer Mosque (2019 First Quarter Constituecy projects) Lot-65 at

Yayarin Tukur Yamma In Buji Constituency JEC/246/2019/VOL.1/25 Yayarin Tukur Nig Ltd 10,318,579.38 Cabinet office 8 weeks

131 17/12/2019

Constr of 2no. Daily Prayer Mosques (2019 First Quarter Constituency project) Lot - 10 at

Kabbe, J/mesa and Kore Bakwarga in Buji Constituency. JEC/204/2019/VOL.1/25 Yayarin Tukur Nig Ltd 3,920,345.07 Cabinet office 8 weeks

132 17/12/2019

Constr of 3no. Daily Prayer Mosques (2019 First Quarter Constituency project) Lot - 9 at

U/Malam Amadu Damisa, Dambazaau Yamma and Kawaya Kudu in Buji Constituency. JEC/203/2019/VOL.1/25 Yayarin Tukur Nig Ltd 5,880,518.55 Cabinet office 8 weeks

133 17/12/2019

Constr of 3no. Daily Prayer Mosques (2019 First Quarter Constituency project) Lot - 21 at Yola

Kauye, Unguwar Gandu and Shema in Gwiwa Constituency. JEC/214/2019/VOL/1/25 Jignaj Global Contr Ltd 5,884,566.00 Cabinet office 8 weeks

134 24/12/2019

Constr of 3no Modified Basic Health Clinics at Bagadaza, Larkan and Dukwana in Fagam

Constituency (2019 Constituency projects) JEC/301/2019/VOL.1/7 Yayarin Tukur Nig Ltd 25,565,018.85 Min of Health 12 weeks

135 11/12/2019

Constr of Hand Pump Boreholes Water Supply Schemes Constituency projects (2019 First

Quarter) Lot-12 at Sabuwar Jawo (sabaru ward), fulanin Ballami (Dandi ward), K/mal. Ali

Headmaster (Gada ward), K/Alto Makeri (Gada ward) and Makabarat Gabas ( Gada ward) in

Kazaure Contituency. JEC/179/2019/VOL.1/20 Yanduna Venture Nig Ltd 3,686,287.50 Min of Water Resources 8 weeks

Bal.C/F 5,635,429,859.39

9

S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT (N) EXECUTING MINISTRIES COMP. PERIOD

BAL. B/F 5,635,429,859.39

136 11/12/2019

Constr of 1no. Block of 2-classroom islamiyya school each ( 2019 first quarter phase 2

Constituency projects) Lot-21 Dumbi, Yarchidau and Gurjiya in Yankwashi Constituency, JEC/133A/2019/VOL.1/7 Yanduna Venture Nig Ltd 9,339,771.12 Cabinet office 12 weeks

137 11/12/2019

Constr of 1no. Block of 2-classroom islamiyya school each ( 2019 first quarter phase 2

Constituency projects) Lot-15 at Daba, Tsohuwar Jawo, Islamiyya Layin Emilalo and Bayan

Lawan Yarima in Kazaure Constituency, JEC/127/2019/VOL.1/7 Yanduna Venture Nig Ltd 12,427,559.12 Cabinet office 10 weeks

138 11/12/2019

Constr of Solar Powered Water Supply Scheme Constituecy project (2019 Phase 1) Lot-8 at

Tsohuwar Fitare in Kazaure Constituency JEC/141/2019/VOL.1/9 Yanduna Venture Nig Ltd 6,023,115.00 Min of Water Resources 8 weeks

139 11/12/2019

Constr of Solar Powered Water Supply Scheme Constituecy project (2019 Phase 1) Lot-7 at

Wawan Rafi in Kazaure Constituency JEC/140/2019/VOL.1/9 Yanduna Venture Nig Ltd 6,023,115.00 Min of Water Resources 8 weeks

140 17/12/2019

Constr of 2no. Daily Prayer Mosques (2019 First Quarter Constituency project) Lot - 48 at

Bandakado and Kuka in Sule Tankarkar Constituency. JEC/234/2019/VOL.1/25 HM Dagara Ldt 3,918,215.20 Cabinet office 8 weeks

141 17/12/2019

Constr of 1no Friday Prayer Mosque (2019 First Quarter Constituecy projects) Lot-79 at

Komai Allah Yayi in Miga Constituency JEC/257/2019/VOL.1/25 Amia Integrated Service Nig Ltd 10,200,863.74 Cabinet office 8 weeks

142 17/12/2019

Constr of 4no. Daily Prayer Mosques (2019 First Quarter Constituency project) Lot - 40 at

Tsohuwar Dalan, Dangoli, Yandadi and Mazama In Miga Constituency. JEC/227/2019/VOL.1/25 Barde Global Concept Nig Ltd 7,840,683.40 Cabinet office 8 weeks

143 17/12/2019

Constr of 2no. Daily Prayer Mosques (2019 First Quarter Constituency project) Lot - 23 at

Faranunbunare and Borandage in Gwiwa Constituency. JEC/216/2019/VOL.1/25 Jignaj Global Contr Ltd 3,923,045.70 Cabinet office 8 weeks

144 17/12/2019

Constr of 3no. Daily Prayer Mosques (2019 First Quarter Constituency project) Lot - 22 at

Ture kwando, Unguwar Yamma and Z/sainawa G/Dagachi in Gwiwa Constituency. JEC/215/2019/VOL.1/25 Jignaj Global Contr Ltd 5,884,568.55 Cabinet office 8 weeks

145 17/12/2019

Compl/Renov of 1no Friday Prayer Mosque (2019 First Quarter Constituecy projects) Lot-90

at Tasheguwa in Kirikasamma Constituency JEC/266/2019/VOL.1/25 Manhaf Global Constr Nig Ltd 7,442,582.78 Cabinet office 8 weeks

146 17/12/2019

Constr of 3no. Daily Prayer Mosques (2019 First Quarter Constituency project) Lot - 47 at

Tagwayen Kuka, Santarbi and Chiromawa in Sule Tankarkar Constituency. JEC/233/2019/VOL.1/25 HM Dagara Ltd. 5,877,322.53 Cabinet office 8 weeks

147 6/12/2019 Constr of Basic Health Centre (BHC) at Masaya Village in Kiyawa Constituency (2nd quarter 2018 Constituency project)JEC/124/2019/VOL/1/6 Umar Aliyu & Sons Nig Ltd 11,853,799.02 Min of Health 12 weeks

148 11/12/2019

Constr of Hand Pump Boreholes Water Supply Schemes Constituency projects (2019 First

Quarter) Lot-14 at Tuda, Zakirai, K/gidan Mal Mai unguwa, Gidan Dachi, Majiyawa, Gangare,

Jigawar Kaba, Mazazzaga, Yammachi, Fake cikin Gari, Kabobi, Haddori, Jama'ar isah

Yaldewa/Gumai, Malamawa, Zakoro, Tasha, Jama;ar Dawa Fulani, Unguwar Abdullahi Mati,

Jigawar Tsaba and Makarantar Andaza in Kiyawa Contituency. JEC/181/2019/VOL.1/20 Tosarawa Global Nig Ltd 14,739,900.00 Min of Water Resources 12 weeks

149 11/12/2019

Constr of Water Collection Point 2019 First Quarter Constituency Project (Lot-21) at Fake

Cikin Gari, Kalali, Katuka Cikin Gari, Garko Cikin Gari, Shuwarin Cikin Gari, Turho, Tsurma

cikin Gari, Kadara Dankargo and Dangoli in Kiyawa Constituency. JEC/192/2019/VOL.1/20 Tosarawa Global Nig Ltd 12,603,490.00 Min of Water Resources 8 weeks

150 17/12/2019

Constr of 1no Friday Prayer Mosque (2019 First Quarter Constituecy projects) Lot-66 at

Sabon Garin Rabadi in Fagam Constituency JEC/247/2019/VOL.1/25 NBS & Sons Nig Ltd 9,171,846.17 Cabinet office 8 weeks

151 11/12/2019

Constr of Solar Powered Water Supply Scheme Constituecy project (2019 Phase 1) Lot-2 at

Kafeje in Auyo Constituency JEC/136/2019/VOL.1/9 AMM Manzo Nig Ltd 6,004,215.00 Min of Water Resources 8 weeks

152 11/12/2019

Constr of Solar Powered Water Supply Scheme Constituecy project (2019 Phase 1) Lot-19 at

Ruwa yakaika in Gwiwa Constituency JEC/148/2019/VOL.1/9 Jignaj Global Contr Ltd 6,023,220.00 Min of Water Resources 8 weeks

Bal.C/F 5,774,727,171.72

10

S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT (N) EXECUTING MINISTRIES COMP. PERIOD

BAL. B/F 5,774,727,171.72

153 11/12/2019

Constr of Solar Powered Water Supply Scheme Constituecy project (2019 Phase 1) Lot-20 at

yola Kauye in Gwiwa Constituency JEC/149/2019/VOL.1/9 Jignaj Global Contr Ltd 6,023,220.00 Min of Water Resources 8 weeks

154 11/12/2019

Consrt of Solar Powered Water Supply Scheme Constituecy project (2019 Phase 1) Lot-21 at

tudunya in Gwiwa Constituency JEC/150/2019/VOL.1/9 Jignaj Global Contr Ltd 6,023,220.00 Min of Water Resources 8 weeks

155 11/12/2019

Constr of Hand Pump Boreholes Water Supply Schemes Constituency projects (2019 First

Quarter) Lot-17 at yankwashi fulani, rauda gabas and dumbule in yankwashi constituency. JEC/183/2019/VOL.1/20 Granitoids Engr Services 2,213,032.00 Min of Water Resources 8 weeks

156 11/12/2019

Constr of Solar Powered Water Supply Scheme Constituecy project (2019 Phase 1) Lot-34 at

addani in yankwashi Constituency JEC/158/2019/VOL.1/9 Granitoids Engr Services 6,022,590.00 Min of Water Resources 8 weeks

157 11/12/2019

Constr of Solar Powered Water Supply Scheme Constituecy project (2019 Phase 1) Lot-33 at

karkarna in yankwashi Constituency JEC/157/2019/VOL.1/9 Granitoids Engr Services 6,022,590.00 Min of Water Resources 8 weeks

158 11/12/2019

Constr of 4no. Daily Prayer Mosques (2019 First Quarter Constituency project) Lots - 16 at

galamawa, G/Biredi, Sabalari, sakwaya and hausawa in Dutse Constituency. JEC/209/2019/VOL.1/9 Backbone global l inks ltd 7,836,430.04 Cabinet office 8 weeks

159 23/12/2019

Constr. of Solar Powered Water Supply Scheme Constituecy project (2019 Phase 1) Lot-35 at

manomi in Malammadori Constituency JEC/285/2019/VOL.1/6 Step by Step Int. Ser. Ltd 6,022,905.00 Min of Water Resources 8 weeks

160 23/12/2019

Constr of Solar Powered Water Supply Scheme Constituecy project (2019 Phase 1) Lot-37 at

Surakin in Malammadori Constituency JEC/286/2019/VOL.1/6 Step by Step Int. Ser. Ltd 6,022,905.00 Min of Water Resources 8 weeks

161 23/12/2019

Constr. of Solar Powered Water Supply Scheme Constituecy project (2019 Phase 1) Lot-9 at

munar yan biyu in Kanya Constituency, Babura LGA. JEC/279/2019/VOL.1/6 Deetech Nig. Ltd 6,010,935.00 Min of Water Resources 8 weeks

162 23/12/2019

Constr. of Solar Powered Water Supply Scheme Constituecy project (2019 Phase 1) Lot-30

atkukule in Gagarawa Constituency JEC/283/2019/VOL.1/6 Farham Synergy Ltd 6,022,800.00 Min of Water Resources 8 weeks

163 11/12/2019

Constr. of 1-block of 2-classrooms islamiyya school each (2019 first quarter phase II

constituency projects) Lot-19 at B/kasuwa, Sakuwa and Ranbazau in Gwaram constituency JEC/131/2019/VOL.1/7 Farham Synergy Ltd 9,344,513.19 Min of Education 8 Weeks

164 23/12/2019

Constr. of 1NO. Solar Powered Water Supply Scheme Constituecy project (2019 Phase 1) Lot-

31 Mutumbi in Gagarawa Constituency JEC/284/2019/VOL.1/6 Farham Synergy Ltd 6,022,800.00 Min of Water Resources 8 weeks

165 23/12/2019

Consrt of 1NO. Solar Powered Water Supply Scheme Constituecy project (2019 Phase 1) Lot-

10 at Kanya cikin gari in Kanya Constituency, Babura LGA. JEC/280/2019/VOL.1/6 Deetech Nig. Ltd 6,010,935.00 Min of Water Resources 8 weeks

166 17/12/2019

Completion/Renov. 3no. Daily Prayer Mosques (2019 First Quarter Constituency project) Lot -

55 at Kundum, Jar kasa B/kasuwa Basirka and and bangon fulani in fagam Constituency. JEC/241/2019/VOL.1/25 Yayarin Tukur Nig Ltd 9,274,972.59 Cabinet office 8 weeks

167 27/12/2019

Constr of 1-block of 2-classrooms islamiyya school each (2019 first quarter phase II

constituency projects) Lot-10A at jidawa, rahama, duru gari, karnaya gari, abanderi, hara and

tashar D/wake in Dutse constituency JEC/111/2019/VOL.1/11 Backbone global l inks ltd 21,724,075.66 Min of Education 18 Weeks

Bal.C/F 5,885,325,095.20

11

S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT (N) EXECUTING MINISTRIES COMP. PERIOD

BAL. B/F 5,885,325,095.20

168 27/12/2019

Constr of 1-block of 2-classrooms islamiyya school each (2019 first quarter phase II

constituency projects) Lot-11 at dahuwa kaku in kiri kasamma constituency JEC/103/2019/VOL.1/11 Nabakwai gen. entr. 3,103,439.45 Min of Education 8 Weeks

169 18/12/2019

Drilling of borehole and construction of overhead tank at fire service directorate

headquaters in Dutse (2019 capital project) JEC/273/2019/VOL.1/8 Al-juraj synergy concept Ltd 6,734,650.13 Min of Water Resources 8 weeks

170 11/12/2019

Construction of hand pump boreholes water supply schemes constituency projects (2019

first quarter) Lot-10 at K/hausa gen. Hospital, bayan reformatory school, alakalawa A,

alakalawa B, Makarantar allo kudu K/hausa, makarantar D/jalla, Makarantar M. sa'adu,

makarantar turkawa, makarantar asharan chiroma, filin idi K/hausa, makarantar su shamsu,

dawasa, yan darman shukura, fulanin toyara, kashe badi, chiroma kwakwata, kutungun,

aguran kwari, usman kukoki, tagadawai, abewa, kazuba, karfa kama, rigar kanawa, kazalewa

UNG, sule M. tubka, kununu, lafiya, katanga, rigar D/iya, kijinawa M. sa'adu, marwa

abdullawa, zilawa abdullawa, aragada abdullawa, kanzan fulani (mai jama'a jingi),

kargumaka (jema haruna), karori, fulanin baushe, mamajo, fulanin rumfa and baushe gari in

K/Hausa constituency. JEC/178/2019/VOL.1/20 Mugin Inv. Nig. Ltd 29,509,200.00 Min of Water Resources 16 Weeks

171 19/12/2019

Rehabilitation of 3no. Water supply scheme at danzomo, maitsamiya, and dankumbo in sule

tankarkar (gumel zone 2019) Lot-2 capital projects JEC/276/2019/VOL.1/8 LIMIS Brothers & Co 4,628,531.25 Min of Water Resources 4 weeks

172 11/12/2019

Construction of hand pump boreholes water supply schemes constituency projects (2019

first quarter) Lot-4 at wuro bagga, gamawari, yola zairare, fulanin takaje, sabon gidan gabas,

fulanin kufayi, hijabau, adamante, rugar abdul kogi, masharmo, makwasharga, waryam B,

lautayi, Yambo, Jalingo G/kwalli, kawarin gari, yadda, gidan yauto (Z/kanya), gumurwa G.A

Idi, Rimin kasuwa and shamakeri B/hanya in Bulangu constituency JEC/173/2019/VOL.1/20 Bulangu dril l ing serveices Ltd 15,491,227.50 Min of Water Resources 12 Weeks

173 11/12/2019

Construction of hand pump boreholes water supply schemes constituency projects (2019

first quarter) Lot-27 at jalomin kudu, malari, zaburan, Ung/tsamiya, kundu, marke ung gabas,

Dunbari, chuguliski, rigar ya'u karami, dolon malam and arbus ung. Mamman in kaugama

constituency JEC/185/2019/VOL.1/20 Mufabamex concept nig. Ltd 7,376,800.00 Min of Water Resources 8 Weeks

174 11/12/2019

Construction of hand pump boreholes water supply schemes constituency projects (2019

first quarter) Lot-30 at koluma, kodau, kata kata, kayoyi, turakan fulani, gidan jauro, jalingo

S/sara, Baba ari, tsangayar gabas, malumawa, karalbali iguda, gobararin fulani, fulanin kira

karama, rugar babayo, gamayin yamma, kayoyi jabo, tafa, jabo gabas, makerawa H/ali and

rugar amadu babai in bulangu costituency JEC/188/2019/VOL.1/20 yusmatech inv. Nig. Ltd 14,754,800.00 Min of Water Resources 14 Weeks

175 11/12/2019

Constr of 1-Block of 2-classrooms islamiyya school each (2019 first quarter Phase II

Constituency projects) Lot-14A at Abdulkadir Secondary School, Matasro Junior Secondary

School and Unguwar Mai aye in Hadejia constituency JEC/126/2019/VOL.1/7 Step by Step Int. Ser. Ltd 9,334,463.01 Min of Education 10 weeks

176 24/12/2019

Constr of 2no. Township Gate in Gumel Local Government Area 2019 third quarter

Constituency projects GHS/A/130/VOL.111/705 Gare Invest Nig Ltd 9,099,121.73 Min of Environment 8 weeks

177 24/12/2019

Constr of Drainage at Kamfala Town in Malam Madori LGA 2019 First Quarter Constituency

Project GHS/A/130/VOL.111.694 Ramadan Constr Nig Ltd 12,261,288.37 Min of Environment 12 weeks

Bal.C/F 5,997,618,616.64

12

S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT (N) EXECUTING MINISTRIES COMP. PERIOD

BAL. B/F 5,997,618,616.64

178 24/12/2019 Constr of Drainage at Hammado in Gumel LGA 2019 Third Quarter Constituency Project GHS/A/130/VOL.111/698 farham synergy con. Ltd 6,497,962.62 Min of Environment 8 weeks

179 24/12/2019

Constr of Drainage at Marakumi Town in Malam Madori LGA 2019 First Quarter Constituency

Project GHS/A/130/VOL.111./679 Meyadi Concept Nig Ltd 9,923,643.97 Min of Environment 12 weeks

180 24/12/2019 Constr of Drainage at Kargo Town in Garki LGA 2019 First Quarter Constituency Project GHS/A/130/VOL.111/684 Umar Aliyu & Sons Nig Ltd 12,899,602.80 Min of Environment 12 weeks

181 24/12/2019 Constr of Drainage at Kandahar in HadejiaLGA 2019 First Quarter Constituency Project GHS/A/130/VOL.111/690 Tasi'u Muhd Invt Nig Ltd 19,286,864.77 Min of Environment 12 weeks

182 24/12/2019

Constr of Drainage at Dantanoma Quarters in Gumei LGA 2019 Third Quarter Constituency

Project GHS/A/130/VOL.3/687 JAG & H Intergreted Service 7,223,498.48 Min of Environment 12 weeks

183 24/12/2019 Constr of Drainage at Dingaya Town In Gwaram LGA 2019 First Quarter Constituency Project GHS/A/130/VOL.III/701 Pullad Global Consultant Nig Ltd 16,180,030.57 Min of Environment 12 weeks

184 13/12/2019 Constr of Drainage at Fake in Kiyawa LGA 2019 2nd Quarter Constituency Project GHS/A/130/VOL.III/666 AGM & Sons Nig Ltd 14,830,841.81 Min of Environment 12 weeks

185 13/12/2019 Constr of Drainage at Makeral Kirnande in Miga LGA 2019 1st Quarter Constituency Project GHS/A/130/VOL.III/680 A. Barde Global Concopt Ltd 5,341,392.00 Min of Environment 8 weeks

186 13/12/2019 Constr of Drainage at Lungun Malamai in Hadejia LGA 2019 1st Quarter Constituency Project GHS/A/130/VOL.III/676 Amia Integrated Service Nig Ltd 4,118,002.53 Min of Environment 8 weeks

187 13/12/2019

Constr of Drainage and Culverts at Kukuma Town in Buji LGA 2019 1st Quarter Constituency

Project GHS/A/130/VOL.III/670 Yayarin Tukur Nig Ltd 9,749,911.22 Min of Environment 12 weeks

188 12/12/2019 Laterite filling at Shuwarin Town in Kiyawa LGA under 3rd Quarter 2018 Constituency Project GHS/A/130/VOL.III/663 Khairushabah Nig Ltd 4,193,265.30 Min of Environment 8 weeks

189 24/12/2019

Constr of Additional 6no. Blocks of 1-block of 3-classrooms at GDSS Kondiko, GGDSS B/kudu,

GDSS Kwarko, GDSS Kiyako, GDSS S/garin Takanebu and GDSS Galamawa GHS/A/4/VOL.IV/220 Babandoki Gen. Entp. 67,198,406.92 Min of Education 10 weeks

190 24/12/2019 Constr of 1-block of two Science Laboratories at GGDSS Roni GHS/A/4/VOL.IV/206 Manhaf Global Concept 33,552,607.41 Min of Education 16 weeks

191 23/12/2019 Construction of pipeline distribution network (28.6km) in Kazaure Town Lot-1 JEC/302/2019/VOL.1/8 CGC Nigeria Ltd 529,952,482.00 Min of Water Resources 24 weeks

192 17/12/2019

Constr of 1NO. Solar Powered Water Supply Scheme Constituecy project (2019 Phase 1) Lot-

97 at Basirka JIBWIS Jumu'at Mosque in fagam Constituency JEC/272/2019/VOL.1/25 Lines dimensions Nig Ltd 3,640,350.00 Min of Water Resources 8 weeks

193 17/12/2019

Installation of solar electrification (2019 first quarter constituency project) Lot-96 at Digijin

and fagam central mosques in fagam constituency JEC/271/2019/VOL.1/25 Lines dimensions Nig Ltd 4,672,301.71 Cabinet office 8 weeks

194 17/12/2019

Installation of solar electrification (2019 first quarter constituency project) Lot-95 at galambi

and basirka central mosques in fagam constituency JEC/270/2019/VOL.1/25 Lines dimensions Nig Ltd 4,478,167.05 Cabinet office 8 weeks

195 19/12/2019

Consr rof 1NO. Solar Powered Water Supply Scheme Lot-7 at Daki daka in Garki LGA (Ringim

zone 2019)-capital project JEC/275/2019/VOL.1/8 LIMIS Brothers & Co 6,019,125.00 Min of Water Resources 8 weeks

196 19/12/2019

Constr of 1NO. Solar Powered Water Supply Scheme Lot-8 at Kunyafa in Babura LGA (Ringim

zone 2019)-capital projects JEC/274/2019/VOL.1/8 LIMIS Brothers & Co 6,019,125.00 Min of Water Resources 8 weeks

197 27/12/2019

Constr of 1-Block of 2-classrooms islamiyya school each (2019 first quarter Phase II

Constituency projects) Lot-20 at garkon alli in kiyawa constituency JEC/112/2019/VOL.1/11 Yarkwari global serv Nig. Ltd 3,113,973.13 Min of Education 12 weeks

198 27/11/2019

Constr of 1-Block of 2-classrooms islamiyya school each (2019 first quarter Phase II

Constituency projects) Lot-3B at Zamini tagir in Auyo constituency JEC/108/2019/VOL.1/11 Yarkwari global serv Nig. Ltd 3,013,570.00 Min of Education 8 weeks

199 23/12/2019

Constr of 1NO. Solar Powered Water Supply Scheme Constituecy project (2019 Phase 1) Lot-

1 at Kafardu in auyo Constituency JEC/277/2019/VOL.1/6 Faahm Integrated Ltd 6,018,915.00 Min of Water Resources 8 weeks

Bal.C/F 6,775,542,655.93

13

S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT (N) EXECUTING MINISTRIES COMP. PERIOD

BAL. B/F 6,775,542,655.93

200 11/12/2019

Construction of hand pump boreholes water supply schemes constituency projects (2019

first quarter) Lot-5 at Maibarewa, Sabalari, K/Fulani and Kadusawa in Dutse constituency JEC/174/2019/VOL.1/20 Farham synergy con. Ltd 2,947,896.00 Min of Water Resources 8 weeks

201 14/12/2019

Construction of water collection points 2019 first querter constituency projects Lot-18 at

kadiran, fagi, karanga and karde in birniwa constituency JEC/189/2019/VOL.1/20 Dabino integ serv Ltd 5,050,128.00 Min of Water Resources 12 weeks

202 14/12/2019

Construction of hand pump boreholes water supply schemes constituency projects (2019

first quarter) Lot-3 at kazura, rugar taho, fulanin karanga, fulanin karanga gabas, fulanin fagi,

rugar saga, fulanin diginsa, Gidan Mal Dahiru, Birniwa U/yamma, rugar idi kulla, rugar

haberi, mara, diginsa, fulanin batu, Umaru mai goro, fulanin mai zariya, korewa, fulanin

kachallari, dargazawa, fulanin kishinde, gidan amadu, fulanin kazadama and inkibulawa

gabas in birniwa constituency JEC/172/2019/VOL.1/20 Dabino integ serv Ltd 15,492,109.50 Min of Water Resources 12 weeks

203 23/12/2019

Construction of classes and admin block at GDSS Kwalam, wurno, kyarama, and sankara

across the state (2019 last quarter MOEST capital projects) lots-9ABCD$E JEC/298/2019/VOL.1/9 Allah Abin Godiya Nig Ltd 51,991,144.67 Min of Education 12 weeks

204 23/12/2019

Constr of 1NO. Solar Powered Water Supply Scheme Constituecy project (2019 Phase 1) Lot-

44 at alkalawa in K/hausa Constituency JEC/289/2019/VOL.1/6 Hambiscons Nig Ltd 6,016,920.00 Min of Water Resources 8 weeks

205 23/12/2019

Constr of 1NO. Solar Powered Water Supply Scheme Constituecy project (2019 Phase 1) Lot-

43 at Kore in K/hausa Constituency JEC/288/2019/VOL.1/6 Hambiscons Nig Ltd 6,016,920.00 Min of Water Resources 8 weeks

206 23/12/2019

Constr of 1NO. Solar Powered Water Supply Scheme Constituecy project (2019 Phase 1) Lot-

38 at gari uku in malam madori Constituency JEC/287/2019/VOL.1/6 Hambiscons Nig Ltd 6,016,920.00 Min of Water Resources 8 weeks

207 23/12/2019

Constr of 1NO. Solar Powered Water Supply Scheme Constituecy project (2019 Phase 1) Lot-

18 at garin tudu in maigatari Constituency JEC/282/2019/VOL.1/6 Hambiscons Nig Ltd 6,016,920.00 Min of Water Resources 8 weeks

208 23/12/2019

Constr of 1NO. Solar Powered Water Supply Scheme Constituecy project (2019 Phase 1) Lot-

17 at kwaduge in maigatari Constituency JEC/281/2019/VOL.1/6 Hambiscons Nig Ltd 6,016,920.00 Min of Water Resources 8 weeks

209 24/12/2191 Rehabilitation of 18No. Water supply Schemes Across the state. JEC/312/2019/VOL.1/13 LIMIS Brothers & Co 9,748,615.80 Min of Water Resources 8 weeks

210 27/12/2019 Constr. Of 1No. Basic Health Clinic at Hangu Village in Gwiwa Constituency project 2019 JEC/303/2019/VOL.1/7 Manhaf Global Constr Nig Ltd 19,663,090.37 Min of Health 16 Weeks

211 17/12/2019

Construction of 4No. Daily prayer Mosques (2019 first Quarter constituency projects) Lot- 51

at Dankama, Karkanai, Burji Fulani and Kuda in Yankwashi Constituency. JEC/237/2019/VOL.1/25 Granitoids Engr Services ltd 7,836,430.04 Cabinet office 8 weeks

212 18/11/2019

Constr, of 2No. Block of 2 Classroom islamiyya (2018 Phase iii on Going Constituency

Projects) Lot-2 at Dadda Gari, Madoji Gari, Jeke Gari and Sarkin Gandu in Sule Tankarkar

Constituency. JEC/95/2019/VOL.1/6 Danfatu & sons Nig Ltd 12,454,716.33 Min of Education 12 weeks

213 24/12/2019

Renovation of WindstormDamaged Structures at Government Science Technical college

Karkarna, Science Secondary School Kafin Hausa and Girls Science Secondary School Jahun

Across the state (2019 MOEST Capital Projects). JEC/313/2019/VOL.I/7 Allah Abin Dogaro Nig Ltd 35,803,002.26 Min of Education 8 weeks

214 11/12/2019

Constr, of 2No. Block of 2 Classroom islamiyya Each (2018 first Quarter Phase II Constituency

Projects) Lot-21 at Ung. Kalgo, Kuda walawa and Bade fulani yankwashi Constituency. JEC/133B /2019/VOL.I/7 Granitoids Engr Services ltd 9,339,771.12 Min of Education 12 weeks

215 11/12/2019

Constr of Soler Power supply Scheme Constituecy project (2019 Phase I) Lot-32 at

Ganbabituwa in Kirikasamma Constituency. JEC/156/2019/VOL.I/9 Dabino integ serv Ltd 6,017,235.00 Min of Water Resources 8 weeks

216 17/12/2019

Constr of 1No. Friday Prayer Mosque (2019 First Quarter Constituency Projects) Lot-67 at

Tsakuran in Fagam Constituency JEC/248/2019/VOL.I/25 Isa Halilu Nig. Ltd 9,315,820.89 Cabinet office 8 weeks

Bal.C/F 6,991,287,215.91

14

S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT (N) EXECUTING MINISTRIES COMP. PERIOD

BAL. B/F 6,991,287,215.91

218 11/12/2019

Constr of Hand Pump Boreholes Water Supply Schemes Constituency projects (2019 First

Quarter) Lot-13 at Sawon Yamma, Gishingawa 2no., Rigar kaiwari, Iyo, Tage, Garin Wakili

Gilakochini, Barmaguwa 2no. Fandun Fulani, Gayin Gane, Lofanga, Daladige, Babba Kamaji

and Marawaji in Kirikasamma Constituency. JEC/180/2019/VOL.I/20 Dabino Integ Serv. Ltd 11,792,080.00 Min of Water Resources 12 weeks

219 11/12/2019

Construction of solar power water supply scheme constituncy project (2019 phase I) Lot-32

at Ganbabituwa in kirikasamma constituency. JEC/156/2019/VOL.I/9 Dabino Integ Serv. Ltd 6,017,235.00 Min of Water Resources 8 weeks

220 17/12/2019

Construction of 3No. Daily prayer Mosques (2019 first Quarter constituency projects) Lot- 5

atYakuda, zazzaugawa and kwalele in Birnin kudu Constituency. JEC/200/2019/VOL.I/25 Nushe Bus, Resources Nig Ltd 5,881,568.50 Cabinet office 8 weeks

221 17/12/2019

Construction of 3No. Daily prayer Mosques (2019 first Quarter constituency projects) Lot- 4

at Kauyen Abuja, Lemo and Gidan Bello in Birnin kudu Constituency. JEC/199/2019/VOL.I/25 Nushe Bus, Resources Nig Ltd 5,883,340.05 Cabinet office 8 weeks

222 17/12/2019

Construction of 3No. Daily prayer Mosques (2019 first Quarter constituency projects) Lot- 3

at Fa'a, Chagu and Gudalai in Birnin kudu Constituency. JEC/198/2019/VOL.I/25 Nushe Bus, Resources Nig Ltd 5,879,148.00 Cabinet office 8 weeks

223 11/12/2019

Construction of hand pump boreholes water supply schemes constituency projects (2019

first quarter) Lot-15 at Sabon Sara, Jigalari, Lumu and Gidan Maza in Miga constituency JEC/182/2019/VOL.I/20 A. Barde Global Concopt Ltd 2,948,820.00 Min of Water Resources 8 weeks

224 17/12/2019

Construction of 2No. Daily prayer Mosques (2019 first Quarter constituency projects) Lot- 50

at Dkakawar Dinya and Kangal in Taura Constituency. JEC/236/2019/VOL.I/25 Dankwara M/jimina Inv. Nig. Ltd 3,916,502.10 Cabinet office 8 weeks

225 17/12/2019

Construction of 1No. Friday prayer Mosques (2019 first Quarter constituency projects) Lot-

63 at Dirimowa in Birniwa Constituency. JEC/244/2019/VOL.I/25 AMM Manzo Nig Ltd 10,518,579.33 Cabinet office 12 weeks

226 17/12/2019

Construction of 3No. Daily prayer Mosques (2019 first Quarter constituency projects) Lot- 42

at magamar uku miga, kikatawa miga and rugar rama in miga Constituency. JEC/229/2019/VOL.I/25 Amia Integrated Service Nig Ltd 5,880,512.85 Cabinet office 8 weeks

227 17/12/2019

Construction of 3No. Daily prayer Mosques (2019 first Quarter constituency projects) Lot- 41

at zangon jigawa gabas, garin gami and gidan kanya in miga Constituency. JEC/228/2019/VOL.I/25 Amia Integrated Service Nig Ltd 5,880,512.55 Cabinet office 8 weeks

228 17/12/2019

Costraction of 3No. Daily prayer Mosques (2019 first Quarter constituency projects) Lot- 7 at

arobade, mungolo and kwanar kangire in Birnin Kudu Constituency. JEC/202/2019/VOL.I/25 Nushe Bus, Resources Nig Ltd 5,874,753.15 Cabinet office 8 weeks

229 17/12/2019

Construction of 3No. Daily prayer Mosques (2019 first Quarter constituency projects) Lot- 6

at saboru, unguwar yamma and karfawa in Birnin Kudu Constituency. JEC/201/2019/VOL.I/25 Nushe Bus, Resources Nig Ltd 5,874,753.15 Cabinet office 8 weeKs

230 17/12/2019

Construction of 1No. Daily prayer Mosques (2019 first Quarter constituency projects) Lot- 38

at Garin Malam Ali in Malammadori Constituency. JEC/225/2019/VOL.I/25 Ramadan Constr Nig Ltd 1,961,522.85 Cabinet office 8 weeks

231 17/12/2019

Construction of 3No. Daily prayer Mosques (2019 first Quarter constituency projects) Lot- 17

at Kaho, K/Malam Yahya Basirka and Sabalari in Fagam Constituency, Gwaram Local

Government Area. JEC/210/2019/VOL.I/25 Ramadan Constr Nig Ltd 5,877,322.53 Cabinet office 8 weeks

232 11/12/2019

Constr, of 1No. Block of 2 Classroom islamiyya Each (2019 first Quarter Phase II Constituency

Projects) Lot-18 at Aduwa in Kafin Hausa Constituency. JEC/130/2019/VOL.I/7 Mai Mai Blocks Ind. Nig. Ltd 3,111,654.55 Min of Education 9 weeks

233 11/12/2019

Constr of Hand Pump Boreholes Water Supply Schemes Constituency projects (2019 First

Quarter) Lot-2 at Kaute , Waje, Gurfai, Gangara, Kurta Fulani G. M/Jadi and Indurkuba Fulani

Arewa in Babura Constituency JEC/171/2019/VOL.I/20 Mufabamex Concept Ltd 3,687,075.00 Min of Water Resources 12 weeks

Bal.C/F 7,082,272,595.52

15

S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT (N) EXECUTING MINISTRIES COMP. PERIOD

BAL. B/F 7,082,272,595.52

234 17/12/2019

Completion/Renovation of 1no. Daily prayer mosques (2019 first quarter constituency

projects) Lot-53 at Sabon Layi K/kudu Iggi in B/kudu Constituency. JEC/239/2019/VOL.I/25 Modang Invest. Ltd. 1,954,613.85 Cabinet Office 8 weeks

235 17/12/2019

Completion/Renovation of 1no. Daily prayer mosques (2019 first quarter constituency

projects) Lot-92 at Turkushawa in Sule Tankarkar Constituency. JEC/268/2019/VOL.I/25 Modang Invest. Ltd. 2,625,238.18 Cabinet Office 8 weeks

236 17/12/2019

Construction of 1No. Friday prayer Mosques (2019 first Quarter constituency projects) Lot-

68 at Malam Baki in Gagarawa Constituency. JEC/249/2019/VOL.I/25 AMM Manzo Nig Ltd 10,518,579.38 Cabinet office 12 weeks

237 17/12/2019

Completion/Renovation of 2No. Daily prayer Mosques (2019 first Quarter Constituncy

projects) Lot-54 at Takur site Layin Yan Kosai and Masajid Matawalle Old Government House

Dutse in Dutse Constituecy. JEC/240/2019/VOL.I/25 Modang Investment Limited 5,143,163.38 Cabinet office 8 weeks

238 17/12/2019

Construction of 1No. Friday prayer Mosques (2019 first Quarter constituency projects) Lot-

69 at Mai-Aduwa in Gagarawa Constituency. JEC/250/2019/VOL.I/25 Modang Investment Limited 10,518,579.38 Cabinet office 8 weeks

239 17/12/2019

Contr. of Wall Fence (2019 first quarter Constituecy projects) Lot- 81 at Dagacheri Juma'at

Prayer Mosque in Birniwa Constituecy. JEC/259/2019/VOL.I/25 AMM Manzo Nig Ltd 3,429,961.13 Cabinet office 8 weeks

240 17/12/2019

Construction of 1No. Daily prayer Mosques (2019 first Quarter constituency projects) Lot- 18

at Zango in Gumel Constituency. JEC/211/2019/VOL.I/25 farham synergy con. Ltd 1,958,251.05 Cabinet office 4 weeks

241 17/12/2019

Construction of 3No. Daily prayer Mosques (2019 first Quarter constituency projects) Lot- 36

at Fake Cikin Gari, Shuwarin Gari and Miyawo Tudu in Kiyawa Constituency. JEC/223/2019/VOL.I/25 Muhal Global Concept Ltd 5,880,518.55 Cabinet office 8 weeks

242 17/12/2019

Construction of 3No. Daily prayer Mosques (2019 first Quarter constituency projects) Lot- 37

at Majiya, Danfusan and Kiyawa cikin Gari in Kiyawa Constituency. JEC/224/2019/VOL.I/25 Muhal Global Concept Ltd 5,880,518.55 Cabinet office 8 weeks

243 27/12/2019

Constr, of 1No. Block of 2 Classroom islamiyya Each (2019 first Quarter Phase II Constituency

Projects) Lot-5 at Hayatul Islam and Kabal in Jahun Constituency. JEC/109/2019/VOL.I/11 Sasco Multi Serv Nig Ltd 6,218,498.70 Cabinet office 9 weeks

244 17/12/2019

Construction of 4No. Daily prayer Mosques (2019 first Quarter constituency projects) Lot- 19

at Jugwa A, Z/Nagogo G/sarkin aska, Z/Ta Gabas and Girawa in Gwaram Constituency. JEC/212/2019/VOL.I/25 JAG & H Intergreted Service 7,846,091.40 Cabinet office 8 weeks

245 17/12/2019

Completion/Renovation of 1No.Friday prayer Mosques (2019 first Quarter Constituncy

projects) Lot-89 at Tashar Dankwmbo in Kanya Constituency in Babura LGA JEC/264/2019/VOL.I/25 Deetech Nig. Ltd 2,131,685.87 Cabinet office 8 weeks

246 15/12/2019 Electrification projects at tashena village and shagaryo town in malam madori LGA. JEC/84/2019/VOL.I/8 A.H.F. Global Nig Ltd 49,293,924.94 Min of Works

16 weeks

247 17/12/2019

Costr.of 1No. Friday prayer Mosques (2019 first Quarter constituency projects) Lot- 76 at

Ladin kani in mai gatari Constituency. JEC/253/2019/VOL.I/25 Khairushabah Nig Ltd 7,609,184.60 Cabinet office

8 Weeks

248 17/12/2019

Costr.of 1No. Friday prayer Mosques (2019 first Quarter constituency projects) Lot- 78 at

Jobi in maigatari Constituency. JEC/256/2019/VOL.I/25 Marb Eng. & Multi serv. Ltd 7,720,042.25 Cabinet office

8 Weeks

Bal.C/F 7,211,001,446.73

16

S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT (N) EXECUTING MINISTRIES COMP. PERIOD

BAL. B/F 7,211,001,446.73

249 17/12/2019

Construction of 3No. Daily prayer Mosques (2019 first Quarter constituency projects) Lot- 45

at Debe kai, Tinti and Daneji Ringim Constituency. JEC/231/2019/VOL.I/25 Marb eng. & Multi Service Ltd 5,884,568.55 Cabinet office 8 weeks

250 17/12/2019

Construction of 4No. Daily prayer Mosques (2019 first Quarter constituency projects) Lot- 35

at Kulluru, Harbon Mai Unguwa, katuka cikin Gari and Abarewa in Kiyawa Constituency. JEC/222/2019/VOL.I/25 Muhal Global Concept Ltd 7,834,461.60 Cabinet office 8 weeks

251 11/12/2019

Construction of 3No. Daily prayer Mosques (2019 first Quarter constituency projects) Lot- 31

at Daneri, Kanoke and Kota in Kaugama Constituency. JEC/221/2019/VOL.I/25 Danfatu & sons Nig Ltd 5,884,568.55 Cabinet office 8 weeks

252 11/12/2019

Constr of Hand Pump Boreholes Water Supply Schemes Constituency projects (2019 First

Quarter) Lot-6 at Kwalam Fulani, Maidu Tsokai, Makwai Fulani, Gidan Haruna Dan Daga,

Sarkin Dare Kofar Shafi'I, Sarkin Dare Fulani, M. Na'annabi Fulani, Garin Dutse Fulani Tale,

Wadi Fulani and Gidan Alasan Nadidi in Gagarawa Constituency JEC/175/2019/VOL.I/21 JAG&H integrated services ltd 7,379,940.00 Min of Water Resources 8 weeks

253 11/12/2019

Constr.of Solar Powered Water Supply Scheme Constituency Project (2019 phase 1) Lot-29 at

Wadda in Gagarawa Constituency JEC/155/2019/VOL.I/9 Farham Synergy con. Ltd 6,022,800.00 Min of Water Resources 8 weeks

254 11/12/2019

Constr. of Solar Powered Water Supply Scheme Constituency Project (2019 PHASE 1) LOT-15

At Dawar Gada in Maigatari Constituency JEC/146/2019/VOL.I/9 A.S.Maifata Gen. EntP. Ltd 6,015,765.00 Min of Water Resources 8 weeks

255 11/12/2019

Constr. of Solar Powered Water Supply Scheme Constituency Project (2019 PHASE 1) LOT-14

At Zuba Barkono in Guri Constituency JEC/145/2019/VOL.I/9 A.Y.H Invest. Co. Nig. LTD. 6,014,715.00 Min of Water Resources 8 weeks

256 11/12/2019

Constr.of Solar Powered Water Supply Scheme Constituency Project (2019 PHASE 1) LOT-12

At Madamuwa in Guri Constituency JEC/143/2019/VOL.I/9 A.Y.H Invest. Co. Nig. LTD. 6,014,715.00 Min of Water Resources 8 weeks

257 17/12/2019

Construction of 1No. Friday prayer Mosques (2019 first Quarter constituency projects) Lot-

76 at Dankumbo in Maigatari Constituency. JEC/254/2019/VOL.I/25 Allah Abin Dogaro Nig Ltd 14,500,005.00 Cabinet office 12 Weeks

258 12/12/2019 Mainatinance and Rehabilitation of some Failed Sections along Kazaure - Roni Road JEC/197/2019/VOL.I/8 Retercha Cmp. Nig Ltd 98,528,040.30 Min of Works 16 weeks

259 11/12/2019

Constr. Of JSS Science each (2019 first quarter phase II constituency projects) LOT-17 at

Gumel and Garin Barka in Gumel constituency. JEC/129/2019/VOL.I/7 Farham Synergy con. Ltd 29,908,200.00 Cabinet office 18 Weeks

260 17/12/2019

Constr. Of 3no. Daily Prayer Mosques (2019 first quarter constituency projects) LOT-44 at

Kwai Kwayu, Kagadama and Gagarawa in Ringim constituency. JEC/230/2019/VOL.I/25 Marb eng. & Multi Service Ltd 5,884,568.55 Cabinet office 8 Weeks

261 27/11/2019

Constr of Wall fence at Jigawa College of Remedial and Advance Studies (JICORAS) Babura,

Lot-2 (3rd & 4th Qtr. 2019 Capital Projects) JEC/113B/2019/VOL.I/10 Ngaloma Constr. Co. Ltd. 131,969,392.51 Min of Education 24 weeks

262 11/12/2019

Constr of Solar Powered Water Supply Scheme Constituency Project (2019 phase 1) Lot-11 at

Unguwar Gabas in Guri Constituency. JEC/142/2019/VOL.I/10 A.Y.H Invest. Co. Nig. LTD. 6,014,715.00 Min of Water Resources 8 weeks

263 11/12/2019

Constr of Solar Powered Water Supply Scheme Constituency Project (2019 phase 1) Lot-5

atGeneral Hospital in Birniwa Constituency. JEC/138/2019/VOL.I/9 A.S.Maifata Gen. EntP. Ltd 6,015,765.00 Min of Water Resources 8 weeks

264 11/12/2019

Constr of Solar Powered Water Supply Scheme Constituency Project (2019 phase 1) Lot-6 at

Kazura in Birniwa Constituency. JEC/139/2019/VOL.I/9 A.S.Maifata Gen. EntP. Ltd 6,015,765.00 Min of Water Resources 8 weeks

Bal.C/F 7,560,889,431.79

17

S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT (N) EXECUTING MINISTRIES COMP. PERIOD

BAL. B/F 7,560,889,431.79

265 11/12/2019

Constr of Solar Powered Water Supply Scheme Constituency Project (2019 phase 1) Lot-13 at

Bodala in Guri Constituency. JEC/144/2019/VOL.I/9 A.Y.H Invest. Co. Nig. LTD. 6,014,715.00 Min of Water Resources 8 weeks

266 17/12/2019

Constr of 1no. Friday prayer mosques (2019 first quarter constituency projects) Lot-77 at Lallashi in

Maigatari Constituency. JEC/255/2019/VOL.I/25 Marb Eng & Multi Serv. Ltd. 7,833,599.56 Cabinet office

8 Weeks

267 6/12/2019

Conversion of Motorized Water Supply Scheme to Solar Powered and Rehabilitation of

Existing Solar Schemes at College of Education Gumel JEC/122/2019/VOL.I/6 SIMS Global Resources 29,243,441.00 Min of Water Resources 8 weeks

268 27/11/2019

Constr of Admin Block at Jigawa College of Remedial and Advance Studies (JICORAS)

Babura, Lot-1 (3rd & 4th Qtr. 2019 Capital Projects) JEC/113A/2019/VOL.I/10 Ngaloma Constr. Co. Ltd. 83,365,963.69 Min of Education 24 weeks

269 7/12/2019

Costr.of 1No. Friday prayer Mosques (2019 first Quarter constituency projects) Lot- 76 at

Ladin Kani in Maigatari Constituency. JEC/253/2019/VOL.I/26 Nadada Venture Nig. Ltd 7,609,184.60Cabinet office

8 Weeks

270 17/12/2019

Costr.of 1No. Friday prayer Mosques (2019 first Quarter constituency projects) Lot- 78 at

Jobi in Maigatari Constituency. JEC/256/2019/VOL.I/26 Nadada Venture Nig. Ltd 7,720,042.25Cabinet office

8 Weeks

271 27/11/2019

Constr. Of Gate House and Toilet at Jigawa Colege od Remedial and advance Studies

(JICORAS) Babura, Lot- 3 (3rd and 4th Quarter 2019 Capital Project) JEC/114/2019/VOL.I/10 Al-sabur Global Nig. Ltd 39,190,677.39Min. of Education

24 Weeks

272 17/12/2019

Costr.of 2No. Friday prayer Mosques (2019 first Quarter constituency projects) Lot- 88 at

Duzau and Danyayi in Kanya Constituency. JEC/265/2019/VOL.I/25 Deetech Nig. Ltd 7,029,877.90Cabinet office

8 Weeks

273 17/12/2019

Constr. Of 4no. Daily Prayer Mosques (2019 first quarter constituency projects) LOT-29 at

Karfawa, Kanawa, Adigul and Balladar Kanya constituency in Babura LGA. JEC/219/2019/VOL.I/25 Deetech Nig. Ltd 7,824,104.04Cabinet office

8 Weeks

274 11/12/2019

Constr. of Solar Powered Water Supply Scheme Constituency Project (2019 PHASE 1) LOT-16

At Dangwabro in Maigatari Constituency JEC/147/2019/VOL.I/9 A.S.Maifata Gen. EntP. Ltd 6,015,765.00Cabinet office

8 Weeks

275 17/12/2019

Constr. Of 2no. Daily Prayer Mosques (2019 first quarter constituency projects) LOT-39 at

Kkama and Kwanar Duniya in Maigatari constituency JEC/226/2019/VOL.I/25 Marb eng. & Multi service Nig Ltd 3,908,555.70Cabinet office

8 Weeks

276 24/12/2019

Constr. Of 1No. Block of 2-Laboratories at GGDSS Roni (2nd Quarter 2019 Constituency

Project) Lot-1 JEC/295/2019/VOL.I/8 Manhaf Global Constr Nig Ltd 33,552,607.41min. of education

12 weeks

277 24/12/2019

Construction of additional block of 3 classrooms each at kondiko, GGASS Binin kudu, GDSS

kwarko, GDSS kiyako, GDSS sabon gari takanebu and GDSS galamawa across the state JEC/294/2019/VOL.I/7 Babandoki Gen. Enterp Nig Ltd 67,198,406.92

min. of education

12 weeks

278 11/12/2019

Constr. of Solar Powered Water Supply Scheme Constituency Project (2019 PHASE 1) LOT-47

At maruta in gwaram Constituency JEC/166/2019/VOL.I/9 farham synergy con. Ltd 6,022,800.00Min. of Water Resouces

8 Weeks

279 17/12/2019

Constr. Of 2no. Daily Prayer Mosques (2019 first quarter constituency projects) LOT-46 at

ruwan garai and dansure tasha in roni constituency JEC/232/2019/VOL.I/25 Na'ayi Resources Nig Ltd 3,919,811.70 Cabinet office

8 Weeks

280 17/12/2019

Constr. Of 3no. Daily Prayer Mosques (2019 first quarter constituency projects) LOT-12 at

gabari, machiba and shagawa in bulangu constituency JEC/206/2019/VOL.I/25 Kawu Nigeria Ltd 5,567,369.55 Cabinet office

8 Weeks

281 17/12/2019

Costr.of 1No. Friday prayer Mosques (2019 first Quarter constituency projects) Lot- 80 at

Kaki mai wando in Roni Constituency. JEC/258/2019/VOL.I/25 Na'ayi Resources Nig Ltd 9,527,340.25 Cabinet office

8 Weeks

Bal.C/F 7,892,433,693.75

18

S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT (N) EXECUTING MINISTRIES COMP. PERIOD

BAL. B/F 7,892,433,693.75

282 17/12/2019

Constr. Of 3no. Daily Prayer Mosques (2019 first quarter constituency projects) LOT-14 at

kwarin bulama, S/garin bulangu, mandamari sabuwa in bulangu constituency JEC/208/2019/VOL.I/25 Kawu Nigeria Ltd 5,842,273.05

Cabinet office

8 Weeks

283 11/12/2019

Constr. of Solar Powered Water Supply Scheme Constituency Project (2019 PHASE 1) LOT-25

At Fagoji in Dutse Constituency JEC/151/2019/VOL.I/9 JAG & H Interg. Service 6,021,015.00 Min. of Water Resouces

8 Weeks

284 11/12/2019

Constr. Of watar collection point 2019 first quarter constituency project Lot 20 at zazzana,

mida, and lafiya in gwaram constutuency JEC/191/2019/VOL.I/20 farham synergy con. Ltd 3,758,997.00 Min of Water resource

8 weeks

285 17/12/2019

Renov. Of 2no. Daily Prayer Mosques (2019 first quarter constituency projects) LOT-84 at

buro and fadi gurje in fagam constituency JEC/262/2019/VOL.I/25 Pullad Global Consultant Ltd 2,503,688.50 Cabinet office

8 Weeks

286 27/11/2019

Constr, of 2No. Block of 2 Classroom islamiyya Each (2019 first Quarter Constituency

Projects) Lot-14c at harazimiyya islamiyya in hadejia Constituency. JEC/107/2019/VOL.I/11 Alh. Umaru Babandoki Nig Ltd 8,055,821.00 Min. of Education

8 weeks

287 11/12/2019

Constr. of Solar Powered Water Supply Scheme Constituency Project (2019 PHASE I) LOT-26

At Kulasa in Dutse Constituency JEC/152/2019/VOL.I/9 JAG & H Interg. Service 6,021,015.00 Min of Water resource

8 Weeks

288 11/12/2019

Constr. of Solar Powered Water Supply Scheme Constituency Project (2019 PHASE I) LOT-27

At Kwaimawa in Dutse Constituency JEC/153/2019/VOL.I/9 JAG & H Intergreted Service 6,021,015.00 Min of Water resource

8 Weeks

289 11/12/2019

Constr. of Solar Powered Water Supply Scheme Constituency Project (2019 PHASE I) LOT-28

At Tabobo in Dutse Constituency JEC/154/2019/VOL.I/9 JAG & H Intergreted Service 6,021,015.00 Min of Water resource

8 Weeks

290 17/12/2019

Constr. Of 3no. Daily Prayer Mosques (2019 first quarter constituency projects) LOT-11 at

turaka, gandu and K/bulama Waek in bulangu constituency JEC/205/2019/VOL.I/25 Kawu Nigeria Ltd 5,865,605.55 Cabinet office

8 Weeks

291 11/12/2019

Constr of Hand Pump Boreholes Water Supply Schemes Constituency projects (2019 First

Quarter) Lot-29 at gangawa, sabara, ruwan dawa, kulleran, ganwa fulani, fanisau, tazara

sabon gida, tula, majiga, harbo, dina, kamai gitsira, dogawa gabashi, bayan kotun cikin gari,

gundin sabon gida and yamma in jahun Constituency JEC/187/2019/VOL.I/20 Sasco Multi Serv Nig Ltd 11,791,752.00

Min. of Water Resouces

14 Weeks

292 11/11/2019

Constr of Hand Pump Boreholes Water Supply Schemes Constituency projects (2019 First

Quarter) Lot-12 at sabuwar jawo (sabaru ward), fulanin ballami (dandi ward), K/Mal. Ali

headmaster (gada ward), K/alta makeri (gada ward) and makabarta gabas (gada ward) in JEC/179/2019/VOL.I/20 Yanduna Venture Nig Ltd 3,686,287.50

Min. of Water Resouces

8 Weeks

293 27/12/2019

Constr, of 1No. Block of 2 Classroom islamiyya Each (2019 first Quarter Constituency

Projects) Lot-5 at hayatul islam and kabal in Jahun Constituency. JEC/109/2019/VOL.I/11 Sasco Multi Serv Nig Ltd 6,218,492.70 Min. of Education

8 weeks

294 11/12/2019

Constr, of 1No. Block of 2 Classroom islamiyya Each (2019 first Quarter Phase II Constituency

Projects) Lot-2 at rukumi in malam madori Constituency. JEC/134/2019/VOL.I/7 Mai Mai Blocks Ind. Nig. Ltd 3,473,316.00 Min. of Education

8 weeks

295 6/12/2019

Constr. Of 1No. Block of science Laboratory at GDSS Dan sure in roni LGA (2019 MOEST

capital Project) Lot-1 JEC/123/2019/VOL.I/6 Na'ayi Resources Nig Ltd 9,561,049.80 Min. of Education

8 weeks

296 17/12/2020

Completion /Renovation of 2no. Friday prayer mosques (2019 first qtrs. Constituency

projects) Lot-84 at Buro and Fadi Gurje in Fagam Constituency. JEC/262/2019/VOL.I/25 Pullad Global Consultant 2,503,688.50 Cabinet Office

8 weeks

297 17/12/2020

Completion /Renovation of 2no. Friday prayer mosques (2019 first qtrs. Constituency

projects) Lot-83 at JIBWIS Fagam and Dangulan in Fagam Constituency. JEC/261/2019/VOL.I/25 Pullad Global Consultant 4,668,587.70 Cabinet Office

8 weeks

Bal.C/F 7,984,447,313.05

19

S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT (N) EXECUTING MINISTRIES COMP. PERIOD

BAL. B/F 7,984,447,313.05

298 17/12/2019

Costr.of 1No. Friday prayer Mosques (2019 first Quarter constituency projects) Lot- 74 at gwalerima in

kaugama Constituency. JEC/251/2019/VOL.I/25 Danfatu & sons Nig Ltd 8,200,007.27Cabinet office

12 weeks

299 17/12/2019

Completion./Renovation Of 3no. Daily Prayer Mosques (2019 first quarter constituency projects) LOT-

56 at magarya, sabuwar unguwa and GGSS Garki in Garki constituency JEC/242/2019/VOL.I/25 MMZ Garki Gen contractor 4,814,329.08Cabinet office

8 Weeks

300 17/12/2019

Completion./Renovation Of 2no. Daily Prayer Mosques (2019 first quarter constituency projects) LOT-

52 at argina and yartsaka in auyo constituency JEC/238/2019/VOL.I/25 MMZ Garki Gen contractor 7,293,833.85Cabinet office

8 Weeks

301 17/12/2019

Costr.of 1No. Friday prayer Mosques (2019 first Quarter constituency projects) Lot- 74 at Ubba in

kaugama Constituency. JEC/252/2019/VOL.I/25 Danfatu & sons Nig Ltd 8,200,007.27Cabinet office

12 weeks

302 17/12/2019

Constr. Of 3no. Daily Prayer Mosques (2019 first quarter constituency projects) LOT-13 at bujaye,

makera mashawai in bulangu constituency JEC/207/2019/VOL.I/25 Kawu Nigeria Ltd 5,784,568.58Cabinet office

8 Weeks

303 27/12/2019

Constr. Administrative block at jigawa college of remedial and advance studies (JICORAS) Babura, Lot-1

(3rd & 4th quarter 2019 capital projects) JEC/113A/2019/VOL.I/10 Ngaloma Constr Nig Ltd 83,365,963.69Min. of Education

24 Weeks

304 17/12/2019

Constr. Of 4no. Daily Prayer Mosques (2019 first quarter constituency projects) LOT-51 at dankama,

karkanai, burji fulani and kuda in yankwashi constituency JEC/237/2019/VOL.I/25 Granitoids Engr Services ltd 7,836,430.04Cabinet office

8 Weeks

305 11/12/2019

Constr of 5No. Hand Pumps Boreholes Water Supply Schemes Constituency projects (2019 First

Quarter) Lot-25 at kanya abbba, dan yayin daurawa, kagadama, walawa and shantake in kanya babba

Constituency JEC/196/2019/VOL.I/20 Deetech Nig. Ltd 5,100,375.00

Min. of Water Resouces

8 weeks

306 11/12/2019

Constr, of 1No. Block of 2 Classroom islamiyya Each (2019 first Quarter Phase II Constituency Projects)

Lot-21 at Ung. Kalgo, Kuda Walawa and Bade Fulani in Yankwashi Constituency. JEC/133/2019/VOL.I/7 Granitoids Engr Services ltd 9,339,771.12 Min. of Education

8 weeks

307 11/12/2019

Constr of Hand Pump Boreholes Water Supply Schemes Constituency projects (2019 First Quarter) Lot-8

at mai dashi, Idi gwamna, unguwar malam, rigar lamido, adiyani islamiyya, dagana Nato, daba, dirba,

rigar malam wuri, yalwa tsangaya, goni garin una, askandi arinjasko, rigar wakilin dajjo lafiya, rigar

babare, and rigar duka maza in guri Constituency JEC/176/2019/VOL.I/20 AYH Intg. Serv. Ltd 10,331,489.00

Min. of Water Resouces

8 weeks

308 24/12/2019

Ren. of Windstorm Damaged Structures at GSTC Karkarna, SSS K/Hausa and GSSS Jahun across the state

(2019 MOEST Capital Projects) JEC/313/2019/VOL.I/7 Allah Abin Godiya Nig Ltd 35,803,002.26Min. of Education

8 weeks

309 17/12/2019

Constr of 4no. Daily prayer mosques (2019 first quarter constituency projects) Lot-19 at Jugwa A.,

Z/nagogo G/Sarkin Aska, Z/Ta gabas and Girawa in Gwaram Constituency. JEC/212/2019/VOL.I/25 JAG&H Integ. Services Ltd 7,846,091.40Cabinet office

8 weeks

310 17/12/2019

Constr. of 3no. Daily Prayer Mosques (2019 first quarter constituency projects) LOT-20 at abena,

babban gidan nahuce and tsangwanwa in gwaram constituency JEC/213/2019/VOL.I/25 JAG & H Intergreted Service 5,880,512.55 Cabinet office

8 Weeks

311 27/11/2020

Constr of 1no. Block of 2-classroom islamiyya school each Lot-9 (first qtr. 2019 constituency project)

at Babura k/Arewa and Garin Baki in Babura Constituency. JEC/102/2019/VOL.I/11 Mufabamex Concept Ltd. 6,391,877.10 Min of Education

7 weeks

312 11/12/2020

Constr of 1no. Block of 2-classroom islamiyya school each Lot-9 (first qtr. Phase II 2019 constituency

project) at Ung. Kalgo, Kuda Walawa and Bade Fulani in Yankwashi Constituency. JEC/133/2019/VOL.I/7 Granitoids Eng Serv. Ltd. 9,339,771.12 Min of Education

12 weeks

313 17/12/2020

Completion /Renovation of 3no. Daily prayer mosques (2019 first qtrs. Constituency projects) Lot-56 at

Magarya, Sabuwar Unguwa and GGSS Garki in Garki Constituency. JEC/242/2019/VOL.I/25 MMZ Garki Gen.Constr Ltd. 4,814,329.08 Cabinet Office

8 weeks

314 17/12/2020

Constr of 2no. Daily prayer mosques (2019 first qtrs. Constituency projects) Lot-46 at Ruwan Garai and

Dansure Tasha in Roni Constituency. JEC/232/2019/VOL.I/25 Na'ayi Resources Ltd. 3,919,811.70 Cabinet Office

8 weeks

Bal.C/F 8,208,709,483.16

20

S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT (N) EXECUTING MINISTRIES COMP. PERIOD

BAL. B/F 8,208,709,483.16

GOODS

315 16/4/2019 Procurement of Assorted Submersible pumps Across the State FGPC/28/2019/VOL.I/8 Umar Aliyu & Sons Nig Ltd 19,479,796.87 Ministry of Water Res 8 Weeks

316 28/06/2019

Supply of Alternative Solar Power Energy and Solar Street light at Jigawa State Institute of

Information Technology Kazaure JEC/41/2019/VOL.I/12 Ngaloma Construction 62,121,465.00 Ministry of Education 12 weeks

317 20/06/2019 Purchase of 2No. Fairly used vechicle JEC/38/2019/VOL.I/4 Modang investment Ltd 39,900,000.00 Government House 2 weeks

318 16/4/2019 Procurement of 2No. 200KVA Perkins Generating Set for Kazaure and Birnin Kudu Zone FGPC/29/2019/VOL.I/8 Limis Brothers & Co 28,619,712.07 Ministry of Water Res 8 Weeks

319 16/4/2019

Supply and Installation of inytegrated standalone Solar Powered Streetlight at buji (150

Units), Basirka/Digijin (120 Units), Kudai (100 Units), balanngu-Sarawa (100 Units) Garin

Gabas (160 Units) and Biriwa Tasha (100 units) Total 710 units (Lot-1) FGPC/24/2019/VOL.I/8 Arrayan Ventures Global 403,649,600.00 Ministry of Works 14 weeks

320 12/2/2019

Supply and Installation of inytegrated standalone Solar Powered Streetlight atGada (150

units) Dandi (100 unit) Amaryawa (100 units) and Yankwashi (80 unit) total 430 units (lot-3) FGPC/4/2019/VOL.I/28 Ngaloma Construction 256,684,050.00 Min of Works & Transport 14 weeks

321 3/5/2019

Supply and Installation of 52No. Standalone Solar Integrated Streetlight (Phase-II)

at the Jigawa State College of Islamic & Legal Studies Ringim JEC/48/2019/VOL.I/7 Sims Global Resources 32,215,050.00 Ministry of Education 4 weeks

322 11/7/2019

Supply and Distribution of Science text Books and Teachers Guide for Senior Secondary

Schools Across the State JEC/43/2019/VOL.I/6 Learn Africa Plc 49,949,800.00 Ministry of Education 6 weeeks

323 31/7/2019 Supply & Installation of Solar streetlight at Emir's Drive, Dutse JEC/47/2019/VOL.I/7 Arrayyan Global Vent 17,319,500.00 Min of Works 8 weeks

324 31/7/2019

Supply & Installation of Stand alone solar powered streetlight at Government Girls Arabic

Secondary School Babura, Government Girls Unity Secondary School Gwaram & Computer

Girls Secondary School Roni. JEC/48/2019/VOL.I/8 Sims Global Res 60,780,300.00 Min of Works 12 weeks

325 19/9/2019

Procurement and Installation of Furniture at the Official Residence of His Excellency, the

Deputy Governor at Dutse JEC/60/2019/VOL.I/6 Aimim Consult Nig. Ltd. 34,825,680.00 Cabinet Office 8 weeks

326 3/9/2019

Procurement and Sewing of 30,000 sets of School Uniforms to Senir Secondary Schools acros

the state JEC/59/2019/VOL.I/6 313 Textile Nig Ltd. 79,980,000.00 Min of Education 12 weeks

327 11/9/2019

Supply and Installations of Integrated Standalone Solar Powered Streetlights at GGASS Sule

Tankarkar, GGSSS Taura and Model Boarding Primary School, Gumel JEC/58/2019/VOL.I/8 SIMS Nigeria Limited 75,380,550.00 Min of Works & Transport 12 weeks

328 12/2/2019

Supply and Installations of Integrated Standalone Solar Powered Streetlight at Hammado-

Gagarawa (200 Unit) Bosuwa (100 Unit) iri (100 Units) Manga-Takwasa (120 Unit) and

Unguwar Gawo-Batali-Kuzunzumi-Balarabe (200 unit) Total 720 Units (Lot 2) FGPC/3/2019/VOL.I/28 SIMS NIGERIA LTD 430,360,875.00 Min of Works & Transport 14 Weeks

329 23/12/2020

Feeding of 597 Boarding School students at MBPS/JSS Kazaure & 35 students at Intel

Disability Kazaure in Kazaure LGA (2019 MOEST Capital Projects) Lot-40. JEC/3514/2019/VOL.I/7 Umar Aliyu & Sons 23,888,538.40 Min of Education 40 weeks

Bal.C/F 9,823,864,400.50

21

S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT (N) EXECUTING MINISTRIES COMP. PERIOD

BAL. B/F 9,823,864,400.50

GOODS

330 16/10/2019

Procurment of Medical Drugs, ICT and Sicbay Equipment for Jigawa Academy for the Gifted,

Bamaina JEC/86/2019/VOL.I/6 IMAM Ahmed Nig Ltd. 4,639,345.25 Min of Education 2 weeks

331 9/12/2019 Purchase of 15no. Vehicles JEC/125/2019/VOL.1/3 CIG motor Company Nig Ltd 169,533,611.20 Govt House 2 weeks

332 11/12/2019

Supply and installation of medical equipment to the 25No. Newly constructed basic health

clinic across the state. JEC/304/2019/VOL.1/7 Dangata mem. inv. Ltd 95,423,350.00 Min of Health 8 weeks

333 24/12/2019

Supply and installations of 100-units integrated standalone solar powered streetlight at

babaldu town in Birnin Kudu LGA JEC/299/2019/VOL.1/7 Ar-rayyan ventures global ltd 55,786,500.00 Min of Works 12 weeks

334 24/12/2019

Supply and installations of 150-units integrated standalone solar powered streetlight at

Garun gudunya and garin gambo towns in babura and gumel LGAs JEC/300/2019/VOL.1/7 SIMS Nig. Ltd 81,328,800.00 Min of Works 12 weeks

335 23/12/2019

Feeding of 1,003 Boarding school students at GGSSS Taura in Taura LGA (2019 MOEST Capital

projects) Lot-26 JEC/337/2019/VOL.I/17 Dankwara Maijimina Gen. Entp. 37,911,714.80 Min of Education 40 weeks

336 18/12/2019

Procurement and installation of Furniture at the official Residence of His Excellency Deputy

Governor Jigawa state in Dutse (2019 Capital Projects) Additional works JEC/60/2019/VOL.1/18 AIMM Consult Nig Ltd 8,750,175.00 Deputy Governor Office 4 weeks

337 23/12/2019

Feeding of 433 Boarding school students at GJSSS Guri in Guri LGA (2019 MOEST Capital

projects) Lot-28 JEC/339/2019/VOL.I/17 Baradugum Gen. Entp. 16,366,540.00 Min of Education 40 weeks

338 15/10/2019

Supply and Installations of Integrated stadalone Solar Powered Streetlight at GGASS

Birniwa, GGASS Kaugama, Science of Deef Hadejia and JSSS Guri JEC/85/2019/VOL.1/18 SIMS Global Resources 77,002,800.00 Min of Works 12 weeks

339 3/12/2019

Supply and installation of 150-units integrated stand alone powered streetlights at marke

town in kaugama LGA JEC/121/2019/VOL.I/7 Sims Global Resources Nig Ltd 82,797,750.00 Min of Works

12 weeks

340 24/12/2019

Supply of Science Laboratories Equipment for Distribution to Senior Sec School Across the

state (2019 MOEST capital project) JEC/318/2019/VOL.I/9 Aldan Project Ltd 29,491,628.72 Cabinet office

8 weeks

341 24/12/2019

Procurement of science laboratory equipments for distribution to 9No. Senior secondary

schols upgraded to science centre of exlence core-2 at GGUSS Malammadori, GDSS G/Gabas,

GGSS garki, GDSS gwuiwa, GUSS aujara, GUSS maigatari, GUSS tsohuwar gwaram, GC birnin

Kudu, and GUSS basirka accross the state JEC/293/2019/VOL.I/9 Quest Ventures Ltd 81,037,103.92

Min. of Education

8 weeks

342 23/12/2019

Feeding of 970 Boarding school students at GGSS S/tankarkar in S/tankarkar LGA (2019

MOEST Capital projects) Lot-24 JEC/335/2019/VOL.I/17 Hassan Habu T. Gen. Entp. 39,182,001.60 Min of Education 40 weeks

343 23/12/2019

Feeding of 790 Boarding school students at GSTC Hadejia in Hadejia LGA (2019 MOEST

Capital projects) Lot-12 JEC/323/2019/VOL.I/17 A.H.M. Global Ventures 29,860,672.80 Min of Education 40 weeks

Bal.C/F 10,632,976,393.79

22

S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT (N) EXECUTING MINISTRIES COMP. PERIOD

BAL. B/F 10,632,976,393.79

GOODS

344 23/12/2019

Feeding of 287 Boarding School students at bamaina academy in birnin kudu LGA (2019

MOEST Capital Projects)LOT-39 JEC/350/2019/VOL.I/17 Kabiru na Malam Nig Ltd 40,204,006.00 min. of education

40 weeks

345 23/12/2019

Feeding of 1031 Boarding school students at GGASS Danzomo in Sule tankarkar Local

Government Area (2019 MOEST Capital project) Lot-25 JEC/336/2019/VOL.I/17 Salisu & Isah Gen. Entp. 38,969,984.00 Min of Education 40 weeks

346 23/12/2019

Feeding of 1,762 Boarding school students at GUSS Maigatari in Maigatari Local Government

Area (2019 MOEST Capital project) Lot-20 JEC/331/2019/VOL.I/17 Shabarawa Gen. Enterpr 66,600,638.40 Min of Education 40 weeks

347 23/12/2019

Feeding of 426 Boarding school students at Science secondary school kanya Babba in Babura

Local Government Area (2019 MOEST Capital project) Lot-41. JEC/352/2019/VOL.I/17 H.A.U. Gen. enterp. 16,102,084.40 Min of Education 40 weeks

348 23/12/2019

Feeding of 635 Boarding school students at MBPS/JSS Ringim in Ringim Local Government

Area (2019 MOEST Capital project) Lot-35 JEC/346/2019/VOL.I/17 H.A.U. Gen. enterp. 23,875,921.20 Min of Education 40 weeks

349 23/12/2019

Feeding of 3378 Boarding school students at GUSS Ringim in Ringim Local Government Area

(2019 MOEST Capital project) Lot-21. JEC/332/2019/VOL.I/17 H.A.U. Gen. enterp. 127,667,604.80 Min of Education 40 weeks

350 23/12/2019

Feeding of 761 Boarding school students at SSS Lautai in Gumel Local Government Area

(2019 MOEST Capital project) Lot-8. JEC/319/2019/VOL.I/17 Bakar Kasa Gen. Enter. 28,764,521.60 Min of Education 40 weeks

351 23/12/2019

Feeding of 1,030 Boarding school students at SAIS Hadejia Local Government Area (2019

MOEST Capital project) Lot-13 JEC/324/2019/VOL.I/17 MS Amar & son enterp 38,932,269.60 Min of Education 40 weeks

352 23/12/2019

Feeding of 753 Boarding school students at GGCSS Roni in Roni Local Government Area (2019

MOEST Capital project) Lot-23 JEC/334/2019/VOL.I/17 Talba Gen. Enterp 28,462,134.80 Min of Education 40 weeks

353 23/12/2019

Feeding of 1319 Boarding school students at GUSS Roni and 170 tsangaya school students at

Gwiwa in Roni and Gwiwa Local Government Area (2019 MOEST Capital projects) Lot-22 JEC/333/2019/VOL.I/17 Adon Sale Bandu 57,699,603.60 Min of Education 40 weeks

354 23/12/2019

Feeding of 1572 Boarding school students at GUSS Fantai and 279 students at school for deaf

in hadejia Local Government Area (2019 MOEST Capital project) Lot-11 JEC/322/2019/VOL.I/17 Alh. Muhammad Kwalli Gen. 69,924,690.40 Min of Education 40 weeks

355 23/12/2019

Feeding of 1703 Boarding school students at GUSS Malammadori in Malammadori Local

Government Area (2019 MOEST Capital project) Lot-37 JEC/348/2019/VOL.I/17 AG Isyaku Gen Ent 64,366,351.60 Min of Education 40 weeks

356 23/12/2019

Feeding of 445 Boarding school students at GSTC Karkarna in Yankwashi Local Government

Area (2019 MOEST Capital project) Lot-27 JEC/338/2019/VOL.I/17 Malabai Gen Ent 16,820,252.40 Min of Education 40 weeks

357 23/12/2019

Feeding of 580 Boarding school students at GJSSS Karkarna in Yankwashi Local Government

Area (2019 MOEST Capital project) Lot-29 JEC/340/2019/VOL.I/17 Malabai Gen Ent 21,923,025.60 Min of Education 40 weeks

358 23/12/2019

Feeding of 635 Boarding school students at MBP/JSS Gumel and 60 Tsangaya school students

at Mai Aduwa in Gumel Local Government Area (2019 MOEST Capital project) Lot-32 JEC/343/2019/VOL.I/17 Wangara Agent Gen Ent. 26,406,169.60 Min of Education 40 weeks

Bal.C/F 11,299,695,651.79

23

S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT (N) EXECUTING MINISTRIES COMP. PERIOD

BAL. B/F 11,299,695,651.79

GOODS

359 23/12/2019

Feeding of 453 Boarding school students at GSTC Ringim in Ringim Local Government Area

(2019 MOEST Capital project) Lot-36 JEC/347/2019/VOL.I/17 Maidala Gen. Ent. 17,122,640.00 Min of Education 40 weeks

360 23/12/2019

Feeding of 2,254 Boarding school students at GGUSS Gwaram in Gwaram Local Government

Area (2019 MOEST Capital project) Lot-9 JEC/320/2019/VOL.I/17 Gobirawa kwari Gen. Ent. 84,333,796.80 Min of Education 40 weeks

361 23/12/2019

Feeding of 1231 Boarding school students at GGASS birniwa in birniwa Local Government

Area (2019 MOEST Capital project) Lot-4 JEC/308/2019/VOL.I/17 A.I. Maiso Gen. Ent. 46,529,720.00 Min of Education 40 weeks

362 23/12/2019

Feeding of 728 Boarding school students at GGJSSS Miga in Miga Local Government Area

(2019 MOEST Capital project) Lot-31 JEC/342/2019/VOL.I/17 Yusif Garba Miga Gen. Ent. 27,511,020.00 Min of Education 40 weeks

363 23/12/2019

Feeding of 1,380 Boarding School students at GUSS Malam Madori LG (MOEST Capital

Projects)LOT-19 JEC/330/2019/VOL.I/17 SawIra gen enterprises 52,161,681.60 Min of Education 40 weeks

364 23/12/2019

Feeding of 1,122 Boarding School students at GSS Aujara in Jahun LG (MOEST Capital

Projects)LOT-15 JEC/326/2019/VOL.I/17Adamu Ibrahim Aujara Gen.

Entp. 42,687,419.20 Min of Education 40 weeks

365 23/12/2019

Feeding of 621 Boarding School students at SAIS Fatara in Dutse LG (MOEST Capital

Projects)LOT-6 JEC/310/2019/VOL.I/17 Baita Daushanga Gen. Entp. 23,394,510.80 Min of Education 40 weeks

366 23/12/2019

Feeding of 1,233 Boarding School students at MBPS/JSS KILA Gwaram LG (MOEST Capital

Projects)LOT-42 JEC/353/2019/VOL.I/17 Baita Daushanga Gen. Entp. 46,605,328.40 Min of Education 40 weeks

367 23/12/2019

Feeding of 882 Boarding School students at GUSS Basirka Gwaram LG (MOEST Capital

Projects)LOT-10 JEC/321/2019/VOL.I/17 Baita Daushanga Gen. Entp. 33,333,159.20 Min of Education 40 weeks

368 23/12/2019

Feeding of 554 Boarding School students at MBP/JSS Guri, 58 Tsangaya School students at

Tarabu and 60 Tsangaya School students at Birniwa in Guri and Birniwa LG (2019 MOEST

Capital Projects)LOT-34 JEC/345/2019/VOL.I/17 GMA Kadira Gen. Entep 25,893,694.00 Min of Education 40 weeks

369 23/12/2019

Feeding of 940 Boarding School students at science secondary school (SSS) Kafin Hausa in

Kafin Hausa LG (MOEST Capital Projects)LOT-16 JEC/327/2019/VOL.I/17 Zango Gen. Entp. 35,530,420.80 Min of Education 40 weeks

370 23/12/2019

Feeding of 467 Boarding School students at GSTC Birnin kudu in Birnin kudu LG (MOEST

Capital Projects)LOT-3 JEC/307/2019/VOL.I/17 Baita Daushanga Gen. Entp. 17,651,815.60 Min of Education 40 weeks

371 23/12/2019

Feeding of 1,077 Boarding School students at GGASS Kaugama in Kaugama LG (MOEST

Capital Projects)LOT-17 JEC/328/2019/VOL.I/17 Danbiri Global Ventures 40,709,000.80 Min of Education 40 weeks

Bal.C/F 11,793,159,858.99

24

S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT (N) EXECUTING MINISTRIES COMP. PERIOD

BAL. B/F 11,793,159,858.99

GOODS

373 23/12/2019

Feeding of 639 Boarding School students at MBPS/JSS Bulangu in Kafin Hausa LG (MOEST

Capital Projects)LOT-33 JEC/344/2019/VOL.I/17Hussaini Ahmed bookshop Gen

Entp. 24,027,126.40 Min of Education 40 weeks

374 23/12/2019

Feeding of 920 Boarding School students at GGUSS Kazaure in Kazure LG (MOEST Capital

Projects)LOT-18 JEC/329/2019/VOL.I/17 Haru jika Gen. Entp. 34,767,096.00 Min of Education 40 weeks

375 23/12/2019

Feeding of 2309 Boarding School students at GGSS Garki in Garki LGA (MOEST Capital

Projects)LOT-7 JEC/311/2019/VOL.I/17 MMZ Garki Gen Const 87,276,300.00 Min of Education 40 weeks

376 23/12/2019

Feeding of 674 Boarding School students at MBPS/JSS Kudai in Dutse LGA (MOEST Capital

Projects)LOT-43 JEC/354/2019/VOL.I/17 Sabuwar Kuka Gen Enterp 25,476,067.60 Min of Education 40 weeks

377 23/12/2019

Feeding of 788 Boarding School students at GJSSS Aujara in Jahun LGA (2019 MOEST Capital

Projects)LOT-30 JEC/341/2019/VOL.I/17 Na'ima and Fati Gen. Entp. 29,785,076.00 Min of Education 40 weeks

378 23/12/2019

Feeding of 209 Boarding school students at Tsangaya school gantsa in bujiLocal Government

Area (2019 MOEST Capital project) Lot-38 JEC/349/2019/VOL.I/17 Zai General Ent. 8,762,692.80

Min. of Education

40 weeks

379 23/12/2019

Feeding of 2,416 Boarding school students at GUCSS Dutse in Dutse Local Government Area

(2019 MOEST Capital project) Lot-35 JEC/309/2019/VOL.I/17 Zai General Ent. 91,320,405.20

Min. of Education

40 weeks

380 23/12/2019

Feeding of 1,696 Boarding school students at GUC Birnin kudu in birnin kudu Local

Government Area (2019 MOEST Capital project) Lot-2 JEC/306/2019/VOL.I/17 Muduka General Ent. 64,105,950.80

Min. of Education

40 weeks

381 23/12/2020

Feeding of 1,407 Boarding School students at GGASS Babura in Babura LGA (2019 MOEST

Capital Projects) Lot-1. JEC/305/2019/VOL.I/7 JALGO Integ. Services Ltd. 53,186,214.40

Min of Education

40 weeks

Bal.C/F 12,211,866,788.19

25

S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT (N) EXECUTING MINISTRIES COMP. PERIOD

BAL. B/F 12,211,866,788.19

SERVICES

382 20/3/2019

Commissioning as consultant for the Supervision of the Construction of Kiyawa Township

Roads Phase II (4km) FGPC/140/2012/VOL.I/111 Sadiq Engineering 13,679,571.15 Min of Works 6 months

383 20/3/2019

Commissioning as consultant for the Supervision of the Construction of Chai Chai Tsohuwa

township Roads FGPC/20/2019/VOL.I/4 UGS Consultants 3,949,973.17 Min of Works 6 weeks

384 20/3/2019

Commissioning as Consultant for the Supervision of the construction of Kanya Babba

Township Roads (2.8km) FGPC/59/2017/VOL.I/60 Curves & Straight design 6,056,229.07 Min of Works 6 months

385 20/3/2019

Commissioning as Consultant for the Supervision of the Construction of Kazaure-Fanda-

Sabaru-Gallu-Karkarna Feeder Road (16km) FGPC/138/2012/VOL.I/228 UKM Civil Engineering 9,226,965.83 Min of Works 6 months

386 20/3/2019

Commissioning as Consultant for the Supervision of the Construction of Hammado-

Dafarantama-Mele-Baikarya-Garin Baki-Kokinami-Liman Mado feeder Roads (32.76km) FGPC/22/2011/VOL.I/179 Hag Engineering 15,959,738.87 Min of Works 6 months

387 20/3/2019

Commissioning as consultant for the supervision of the Construction of Zandam Nagogo

township Roads (2.38km) FGPC/6/2012/VOL.I/III Land Base Engineering 7,629,535.56 Min of Works 6 months

388 20/3/2019

Commissioning as Consultant for the supervision of the Construction of Kaugama - Malam

Madori Feeder Road (19.31km) FGPC/411/2018/VOL.I/21 SIIS Engineering Consult 9,112,024.27 Min of Works 6 months

389 20/3/2019

Commissioning as consultant for the Supervision of the Construction of Guduncin-Aguyaka

Road (4.30km) FGPC/59/2017/VOL.I/56 Curves & Straight design 17,024,414.69 Min of Works 10 months

390 20/3/2019

Commissioning as Consultant for the Supervision of the Construction of Kwanar Medi-

Danzomo-Garki Road (29.51km) FGPC/59/2017/VOL.I/54 Curves & Straight design 62,714,754.77 Min of Works 20 months

391 26/3/2019

Commissioning as consultant for the Supervision of the Supply and Installation of

Intergrated Standalone Solar Powered Streetlights at Buji 150 units, Basirka/Digijin 120

Units, Kudai 100 Units, Bulangu-Sarawa 100 units, garin Gabbas 160 units and birniwa Tasha FGPC/21/2019/VOL.I/10 ARDUGAL Engineering Ltd 7,606,368.00 Min of Works 4 months

392 26/3/2019

Commissioning as Consultant for the Supervision of the Supply and Installation of

Integrated Standalone Solar Powered Streetlights at Hammado-Maituruniya-Duhuwa-

Gangar 200 Units, Bosuwa 100 units, Kiri 100 units, Manga-Takwasa 12 units and unguwar

Gawo-Bataki-Kuzunzumi-Balarabe 200 units (Total 720 units) FGPC/22/2019/VOL.I/10 Secwave Nigeria Limited 7,531,315.31 Min of Works 4 months

393 10/4/2019

Commissioning as consultant for the supervision of the construction of sada-Kanawa-

Dankari-Nasarawa-Kuda Feeder Road (11.2km) FGPC/138/2012/VOL.I/248 UKM Engineering Consult 6,889,699.73 Ministry of Works 6 Months

BAL. C/F 12,379,247,378.61

26

S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT (N) EXECUTING MINISTRY COMP. PERIOD

BAL. B/F 12,379,247,378.61

394 24/5/2019

Commissioning as Consultant for the Training and Technical Support of 250No Senior

Secondary School Teachers on K-Yan Machine for the Facilitation of E-Learning at Senior

Secondary Schools Across the State FGPC/32/2019/VOL.I/8 C-Stemp Construction Skil ls 36,227,761.00 Ministry of Education 6 Month

395 20/3/2019

Commissioning as Consultant for the Supervision of the Construction of Birnin Kudu-Zazia-

KwanGwara-Nafadan Warji-Nafadan Kanawa-Marmara-Kadangare-Hirin-Kwatai Nafara

Feeder Road (33 Km) FGPC/29/2011/VOL.I/77 Himma Tech Service & Co 19,415,172.13 Min of Works 10 months

396 20/3/2019

Commissioning as Consultant for the Supervision of the Construction of Gumel Township

Roads (Phase III) 4.7Km FGPC/29/2011/VOL.I/75 Himma Tech Service & Co 17,440,289.13 Min of Works 6 months

397 20/3/2019

Commissioning as Consultant for the Supervision of the Re-Construction of Taura-Garki

Road (26.68Km) FGPC/29/2011/VOL.I/73 Himma Tech Service & Co 51,197,948.77 Min of Works 16 months

398 20/3/2019

Commisiioning as Consultant for the Supervision of the Construction of Miga Township

Roads (Phase II) 3.1Km) FGPC/223/2018/VOL.I/32 Apex Design & Associate 13,091,926.38 Min of Works 6 months

399 20/3/2019

Commissioning as Consultant for the Supervision of the Construction of Balago-Kadowawa-

Dumadumin Ky-Dumadumin Toka-Auno Road (41.2km) FGPC/223/2018/VOL.I/30 Apex Design & Associate 93,126,261.93 Min of Works 24 months

400 20/3/2019

Commissioning as Consultant for the Supervision of the Construction of Jigawar Dan Ali

Township Roads (2.1km) FGPC/97/2013/VOL.I/36Akram Engineering &

Management 7,484,294.27 Min of Works 6 monthd

401 20/3/2019

Commissioning as Consultant for the Supervision of the Construction of Access Roads to

744, Sabuwar Takur and Yalwawa township roads (8.1km) FGPC/59/2017/VOL.I/58 Curves & Straight design 27,603,997.03 Min of Works 10 months

402 26/6/2019

Engagement/Commissioning as Consultant for the reconciliation and recovery of

unremitted pay as you earn (PAYE) of Staff of Federal Government Agencies Residing in

Jigawa State for the period off 2002-2018(8% of N 6,383,001,715.57) JEC/57/2019/VOL.I/6 Henry Young And Co. 563,172,144.01 Min of Finance 6 weeks

403 27/11/2019

Supervision of the construction works at jigawa college of remedials and advance studies

(JICORAS) babura, Lot-6 (3rd and 4th quarters 2019 capital projects) JEC/223/2018/VOL.I/67 Apex Design & Associates 23,537,374.82 Min. of Education

6 months

TOTAL 13,231,544,548.08

27

SECTION ( E )

COMPLETED PROJECTS

JANUARY TO DECEMBER, 2019

Ministry of Health

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

1 General Renov ation/Improv ement w orks at Dutse General Hospital Ummu Khulsum Global Dutse 56,668,862.45 56,668,862.45 56,666,735.62 30/12/2016 16 w eeks 100 Completed

2

Supply and Installation of Solar Powered Lightening System at

Dutse Gen. Hospital SIMS Global Resources Dutse 27,835,303.13 27,835,303.13 27,835,303.13 2/11/2017 8 Weeks 100 Completed

3

Supply and installation of Solar Powered lightening System in

Babura General Hospital. Sims Global Resources Babura 20,984,971.88 20,984,971.88 20,984,971.87 20/12/2017 8 Weeks 100 Completed

4

Supply and installation of Solar Powered lightening System in

GumelGeneral Hospital. Sims Global Resources Gumel 30,263,168.13 30,263,168.13 30,262,168.12 20/12/2017 8 weeks 100 Completed

5

General Renov./Improvement of Auyo Model Primary Health

Care at Auyo town, Auyo LGA. Math Global Investment Auyo 87,354,794.85 87,354,794.85 86,269,610.43 3/9/2018 24 weeks 100 Completed

6

Construction of Prototype Basic Health Care Clinic (Lot-3) at

Kale in Jahun Local Government Area. Baban-Doki General Entp. Jahun 19,816,590.02 19,816,590.02 18,497,752.60 14/11/2018 12 weeks 100 Completed

7

Construction of Prototype Basic Health Care Clinic (Lot-4) at

Harbo Sabuwa in Jahun Local Government Area. Ngloma Constr. Comp. Ltd Jahun 20,061,603.77 20,061,603.77 20,052,221.17 14/11/2018 12 weeks 100 Completed

8

Construction of Prototype Basic Health Care Clinic (Lot-16) at

Gora in Roni Local Government Area. Khanadi Global Links Roni 20,260,338.21 20,260,338.21 20,136,492.07 14/11/2018 12 weeks 100 Completed

9

Construction of Prototype Basic Health Care Clinic (Lot-19) at

Zauma in Gwiwa Local Government Area. Ngloma Constr. Comp. Ltd Gwiwa 20,129,282.23 20,129,282.23 19,170,744.98 14/11/2018 12 weeks 100 Completed

10

Construction of Prototype Basic Health Care Clinic (Lot-21) at

Yola in Gwiwa Local Government Area. Baban-Doki General Entp. Gwiwa 19,899,400.66 19,899,400.66 19,489,949.48 14/11/2018 12 weeks 100 Completed

11

Construction of Prototype Basic Health Care Clinic (Lot-8) at

Hadin in Kaugama Local Government Area. Dangata Memorial Invest. Kaugama 19,495,565.93 19,495,565.93 18,197,951.22 14/11/2018 12 weeks 100 Completed

12

Construction of Prototype Basic Health Care Clinic (Lot-23) at

Dabawa in Babura Local Government Area. Ngloma Constr. Comp. Ltd Babura 19,035,497.45 19,035,497.45 18,038,513.27 14/11/2018 12 weeks 100 Completed

13

Construction of Prototype Basic Health Care Clinic (Lot-1) at

Dundubus in Dutse Local Government Area. ALLAH Abin dogara Nig. Ltd. Dutse 19,725,041.09 19,725,041.09 19,626,682.66 14/11/2018 12 weeks 100 Completed

14

Construction of Prototype Basic Health Care Clinic (Lot-13) at

Chakwaikwaiwa in Taura Local Government Area. Baban-Doki General Entp. Taura 19,683,109.98 19,683,109.98 19,670,756.17 14/11/2018 12 weeks 100 Completed

Balance C/F 401,213,529.78 401,213,529.78

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

Balance B/F 401,213,529.78 401,213,529.78

15

Construction of Prototype Basic Health Care Clinic (Lot-17) at

Sankau in Roni Local Government Area. Al-Sabur Global Links Ltd. Roni 19,555,834.00 19,555,834.00 19,534,098.87 14/11/2018 12 weeks 100 Completed

16

Construction of Prototype Basic Health Care Clinic (Lot-18) at

Takurdawa in Roni Local Government Area. Al-Sabur Global Links Ltd. Roni 19,416,248.88 19,416,248.88 19,394,181.48 14/11/2018 12 weeks 100 Completed

17

Construction of Prototype Basic Health Care Clinic (Lot-20) at

Firjin Yola in Gwiwa Local Government Area. Pullad Global Consultant Nig Gwiwa 19,663,657.62 19,663,657.62 19,577,089.86 14/11/2018 12 weeks 100 Completed

18

Construction of Prototype Basic Health Care Clinic (Lot-7) at

Ubba in Kaugama Local Government Area. Nushe Business Resources Kaugama 20,025,983.09 20,025,983.09 19,997,296.20 14/11/2018 12 weeks 100 Completed

19

Construction of Prototype basic Health Care Clinic (Lot-6) at

Mezan in Kafin Hausa L.G.A. Asaka Construction Nig. Ltd. K/Hausa 19,315,830.95 19,315,830.95 18,285,824.55 14/11/2018 12 weeks 100 Completed

20

Construction of Prototype basic Health Care Clinic (Lot-2) at

Lafiya in Birnin kudu L.G.A. Imam Ahmad Nig. Ltd. B/kudu 19,956,897.66 19,956,897.66 19,840,781.07 14/11/2018 12 weeks 100 Completed

21

Construction of Prototype basic Health Care Clinic (Lot-11) at

Gagarawa Gari in Gagarawa L.G.A. Math Global Investment Ltd Gagarawa 20,290,282.93 20,290,282.93 20,157,450.85 14/11/2018 12 weeks 100 Completed

22

Construction of Prototype basic Health Care Clinic (Lot-15) at

Siyori in Garki L.G.A. Sabon Garin 'Yaya Garki 20,293,808.95 20,293,808.95 20,159,968.97 14/11/2018 12 weeks 100 Completed

23

Construction of Prototype basic Health Care Clinic (Lot-12) at

Jeke in Sule Tankarkar L.G.A. Sir Welter Drilling & General S/Tankarkar 20,887,831.00 20,887,831.00 20,734,104.26 14/11/2018 12 weeks 100 Completed

24

Construction of Prototype basic Health Care Clinic (Lot-9) at

Saleri in Kirikasamma L.G.A. Nushe Business Resources Kiri Kasamma 19,816,590.01 19,816,590.01 19,708,414.74 14/11/2018 12 weeks 100 Completed

25

Co ns truc tio n o f pro to type bes ic Health Care Clinic (Lo t-5) Gafaya in

Kafin haus a L.G.A. Yus matech Inves tment Nig. Ltd K/Haus a 20,637,816.30 20,637,816.30 20,489,694.12 14/11/2018 12 weeks 100 Completed

26 Co ns tr o f One blo ck o f Health po s t a t Kwandiga village in Kaugama LGA. Sambu Synergy Co ncept Ltd. Kaugama 2,865,048.91 2,865,048.91 2,854,621.41 31/12/2018 8 weeks 100 Completed

27 Co ns tr o f o ne blo ck o f hea lth po s t a t Karko village in Gwaram LGA. Ngaloma Constr. Co. Ltd. Gwaram 7,543,976.80 7,543,976.80 7,520,739.77 31/12/2018 12 weeks 100 Completed

Balance C/F 631,483,336.88 631,483,336.88

1b

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

Balance B/F 631,483,336.88 631,483,336.88

28

Co ns tr o f P ro to type Bas ic Health Care Clinic (Lo t-10) a t Birniwa Tas ha in

Birniwa LGA. Wajabs Building and Co ns tr Birniwa 19,756,195.59 19,756,195.59 19,656,319.72 14/11/2018 12 weeks 100 Completed

29

Supply and Is ta lla tio n o f Ho s pita l Equipments to Kafin haus a Genera l

Ho s pita l Dagari Integra ted Services K/Haus a 83,543,417.50 83,543,417.50 83,543,417.50 28/12/2018 8 weeks 100 Completed

30

Construction for the construction of health post at Tashena Village in

M alam M adori Local Government Area. DALARI CONSTRUCTION M /madori 7,543,976.80 7,543,976.80 7,519,281.10 31/01/2019 8 Weeks 100 Completed

31

Renovation works (2019 Phase I) Constittuency Project at Haya PHC

and Gamji Health post in Fagam Constituency, Gwaram Local

Government Area. GIDAN ADEDE GENERAL Gwaram 12,468,995.04 12,468,995.04 12,421,231.26 31/01/2019 8 Weeks 100 Completed

32

Construction of Health Post at Redo Viillage inGwaram Local

Government Area Ramadan Gwaram 7,543,976.80 7,543,976.80 7,184,739.76 14/01/2019 8 weeks 100 Completed

33

Construction of Health Post at Sarkin Baka Village in Babura Local

Government Area Babandoki Babura 7,543,976.10 7,543,976.80 7,504,149.76 10/6/2019 8 weeks 100 Completed

34

Construction of Health Post at Waza Viillage in Birnin Kudu Local

Government Area Ngaloma Construction B/kudu 7,543,976.80 7,543,976.80 7,520,739.76 14/1/2019 8 weeks 100 Completed

35

Construction of Health Post at Karko Viillage inGwaram Local

Government Area Ngaloma Construction Gwaram 7,543,976.80 7,543,976.80 7,520,739.76 14/1/2019 8 weeks 100 Completed

36 Constr of Health Post at Shiyo in Auyo DDN Constr Co. Auyo 2,865,048.91 2,865,048.91 2,854,621.41 31/12/2018 8 weeks 100 Completed

37

Contract for the supply & Installation of M edical Equipment to Ringim

General Hospital Dagarai Integrated Srv Ringim 82,153,507.50 82,153,507.50 82,153,507.50 1/7/2019 8 weeks 100 Completed

38 Constr of Health post of Sharkawa in Kaugama M aikatako & Sons Kaugama 7,543,976.80 7,543,976.80 7,184,739.76 31/12/2018 8 weeks 100 Completed

39

M aintenance of to ilets and reconstruction of soakway at female hostels

School of Nursing Hadejia GIDAN ADEDE GENERAL Hadejia 2,467,026.00 2,467,026.00 2,467,026.00 27/06/2019 8 weeks 100 Completed

Total 880,001,387.52 880,001,388.22

1c

Ministry of Water

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

1 Improv ement of Kazaure tow n Water Supply Marb Eng. & Multy Serv ices Kazaure 131,208,239.13 163,939,534.76 156,132,890.23 7/28/2016 7 w eeks 100 Completed

2 Improv ement of Ringim tow n w ater supply Marb Eng. & Multy Serv ices Ringim 137,576,766.21 213,146,514.63 213,145,467.79 11/23/2016 20 w eeks 100 Completed

3

Constr. Of Hand Pumps Water Supply Schemes as

Constituency Projects at Falkin Jalo Nasaraw a, Fulanin

Kuka Uku, Fulanin Liman Mado, Fulanin Gangara and

Fulanin Dan'ama Gabas in Gumel Constituency . JAG & H Int. Serv ices Gumel 2,742,600.00 2,742,600.00 2,735,743.50 29/8/2017 8 w eeks 100 Completed

4

Constr. Of Solar Pow ered Water Supply Schemes

(Phase I) as Constituency Project at Mary e in Birniw a

Constituency ADZ GLOBAL SERV LTD Birniw a 6,968,010.00 6,968,010.00 6,950,589.98 7/8/2017 8 Weeks 100 Completed

5

Constr. Of Hand Pumps Supply Schemes (Phase I-2017)

as Constituency Project at Kofar Gabas Gw aram,

Barebari Makabarta Sabuw a, Auy akaw a Gidan Dutse

Gw aram, Tambo Gw aram and Sumangara in Gw aram

Constituency AZZIDS NIG LTD Gw aram 7,076,160.00 7,076,160.00 7,076,160.00 28/8/2017 8 Weeks 100 Completed

6

Upgarding and Conv ersion of 7No Motorized Water

Supply Schemes to Solar Pow ered Water Supply

Schemes at Dundubus, Kafin Gana, Danmakama,

Marma, Bulangu, Dansure and Jigaw a Tow n. SIM S GLOBAL RESOURCE State 90,265,107.03 90,265,107.03 90,038,444.26 25/08/2017 16 weeks 100 Completed

7

Rehabilitation of Solar Pow ered Water supply schemes

across the State at Birnin kudu, Dutse, Hadejia,Ringim,

Gumel, Jahun and Kazaure zone (Stow a) Sims Global Resources Across the state 166,689,700.28 166,689,700.28 166,272,976.03 18/12/2017 12 w eeks 100 Completed

8

Constr of (10No.) Hand Pumps Water Suppy Schemes

2017 Constituency Phase II Projects (Lot-5) at

Kw akw ado Fulani, Kabaw a, Danbagaje Fulani,Rigar

Dumu Dakau, Fulanin Fankami, Gana , Gw allaw a

Unguw ar Kole, Jama'ar Dan Maigari and Ribinji in Garki

Constituency Loy alty Properties Garki 7,980,000.00 7,980,000.00 7,980,000.00 1/24/2018 8 w eeks 100 Completed

9

Constr. Of (1no.) Solar [pow ered w ater supply scheme

2017 constituency phase II project (LOT-29) at Kadamu

tudu tashena in M/madori Constituency . Limis Brothers & Co. M/madori 6,968,430.00 6,968,430.00 6,951,008.93 24/1/2018 8 w eeks 100 Completed

10

Construction of (1No.) Solar Pow ered Water supply

scheme 2017 Constituency phase III Projects (Lot-39) at

Jama'ar Suga in Kirikasamma Constituency . Bulangu Drilling Serv ices K/kasamma 6,968,430.00 6,968,430.00 6,968,430.00 6/2/2018 8 w eeks 100 Completed

11

Construction of Hand Pumps Water Supply Scheme 2017

Constituency Phase III Projects (Lot-10) at Unguw ar Faru

in Kazaure Consituency . Na'ay i Resouces Ltd. Kazaure 797,580.00 797,580.00 797,580.00 6/2/2018 8 w eeks 100 Completed

Balance C/F 565,241,022.65 673,542,066.70

2a

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

Balance B/F 565,241,022.65 673,542,066.70

12

Construction of (6No.) Hand Pumps Water supply

scheme 2017 Constituency phase II Projects (Lot-10) at

Faskarau, Ubba, Fulanin Askandu, Turmi, Kanjuw a and

Bay in Kw ari in Kaugama Constituency . ADZ Global Serv ices Ltd. Kaugama 4,803,750.00 4,803,750.00 4,791,740.65 22/2/2018 8 Weeks 100 Completed

13

Upgrading and Conversion of Motorised Boreholes

to Solar Powered at 7no. Towns water supply

schemes (Kanya Babba in Babaura LGA, Danzomo

in S/tankarkar LGA, Kudai in Dutse LGA and Waza

in B/kudu LGA) SIMS GlobalResources State 82,495,606.57 82,495,606.57 78,710,101.05 10/4/2018 16 weeks 100 Completed

14

Constr of Hand pump Boreholes as constituency

projects (2018 phase II) Lot-7 at Zunburu, Tange,

S/garin Matsango, Bagiya, Ligada, Kuyungu (2no.),

Rigar Beti Digijin and Tudun Wada Fagam in Fagam

Constituency. Loyalty Properties Nig. Ltd. Gwaram 6,603,660.00 6,603,660.00 6,603,660.00 18/12/2018 8 weeks 100 Completed

15

Constr of Hand pump Boreholes as constituency

projects (2018 phase II) Lot-10 at Fulanin Dan

Ama, Dantanoma Sarkin Gora, Jarumai Abuja

Quarters, Nasarawa M/Juma'a, Fulanin Kanjau,

Haruna Kuka Uku, Fulanin Danfarantama, Garin

Ginsau, Prison Qtrs. and Gidan maigari in Gumel

Constituency. Farham Synergy Concept Gumel 7,374,150.00 7,374,150.00 7,374,150.00 18/12/2018 6 weeks 100 Completed

16

Conversion of 2no. Motorized boreholes to Solar

powered water supply schemes at Main pump

station Sule Tankarkar and Oliya pump station in

Sule Tankarkar LGA. SIMS Global Resources S/Tankarkar 42,243,266.00 42,243,266.00 42,243,265.99 31/12/2018 12 weeks 100 Completed

17

Constr of Hand pump Boreholes as constituency

projects (2018 phase II) Lot-2 at Guruma and

Mungula B/Kudu Constituency. Umar Aliyu & Sons Nig. Ltd. B/kudu 1,475,560.00 1,475,560.00 1,475,560.00 18/12/2018 4 weeks 100 Completed

18

Constr of (1no.) Solar Powered Water Supply

Scheme Constituency Projects (2018 phase 1) Lot-

9 at Zareku Miga Constituency. AMIA Integ. Services Miga 6,022,275.00 6,022,275.00 6,008,141.00 17/10/2018 8 weeks 100 Completed

19

Constr of (1no.) Solar Powered Water Supply

Scheme Constituency Projects (2018 phase 1) Lot-

27 at U/Shuri in Babura Constituency. Mufabamex Consept Babura 6,020,700.00 6,020,700.00 6,008,057.21 17/10/2018 8 weeks 100 Completed

20

Constr of (1no.) Solar Powered Water Supply

Scheme Constituency Projects (2018 phase 1) Lot-

47 at Danzomo Gari in Sule Tankarkar

Constituency. Lautai General Invest. S/tankarkar 6,023,115.00 6,023,115.00 6,008,057.21 17/10/2018 8 weeks 100 Completed

21

Constr of (1no.) Solar Powered Water Supply

Scheme Constituency Projects (2018 phase 1) Lot-

28 at Kantudu in Roni Constituency. HIKIMA Synergy Gen. Roni 6,023,115.00 6,023,115.00 6,008,057.21 17/10/2018 8 weeks 100 Completed

22

Constr of (1no.) Solar Powered Water Supply

Scheme Constituency Projects (2018 phase 1) Lot-

33 at Matsarida in Maigatari Constituency. A+Tech Integ. Nig Ltd. Maigatari 6,022,275.00 6,022,275.00 6,007,219.31 17/10/2018 8 weeks 100 Completed

Balance C/F 740,348,495.22 848,649,539.27

2b

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

Balance B/F 740,348,495.22 848,649,539.27

25

Constr of (1no.) Solar Powered Water Supply

Scheme Constituency Projects (2018 phase 1) Lot-

40 at Farin Dutse in Fagam Constituency, Gwaram

LGA. A+Tech Integ. Nig Ltd. Gwaram 6,022,275.00 6,022,275.00 6,005,648.25 17/10/2018 8 weeks 100 Completed

26

Constr of (1no.) Solar Powered Water Supply

Scheme Constituency Projects (2018 phase 1) Lot-

37 at Mai'adua in Gagarawa Constituency. LIMIS Brothers & Co. Gagarawa 6,020,700.00 6,020,700.00 5,985,000.00 17/10/2018 8 weeks 100 Completed

27

Constr of (1no.) Solar Powered Water Supply

Scheme Constituency Projects (2018 phase 1) Lot-

31 at Takur in Dutse Constituency. Talaku Ingrated Services Dutse 6,000,000.00 6,000,000.00 5,985,000.00 17/10/2018 8 weeks 100 Completed

28

Constr of (1no.) Solar Powered Water Supply

Scheme Constituency Projects (2018 phase 1) Lot-

32 at Rungumau in Dutse Constituency. Talaku Ingrated Services Dutse 6,000,000.00 6,000,000.00 5,985,000.00 17/10/2018 8 weeks 100 Completed

29

Constr of (1no.) Solar Powered Water Supply

Scheme Constituency Projects (2018 phase 1) Lot-

20 at Zabaran in Gumel Constituency. Muhal Global Concept Gumel 6,020,700.00 6,020,700.00 6,020,700.00 17/10/2018 8 weeks 100 Completed

30

Constr of (10no.) Hand pumps Water Supply

Scheme Constituency Projects (2018 phase 1) Lot-

8 at Fulanin Akwalawa, Garin Kailu, Harbo sabo,

Fulanin Mele, Dagerawa, Danfarantama, F/Mijin

Gini, Lautai Science, Boarding Girls Pri. & JSS and

Kuka Uku Fulani in Gumel Constituency. Muhal Global Concept Gumel 7,347,380.00 7,347,380.00 7,347,379.99 17/10/2018 12 weeks 100 Completed

31

Constr of (1no.) Solar Powered Water Supply

Scheme Constituency Projects (2018 phase 1) Lot-

6 at Anturu in Birniwa Constituency. Synclime Nig. Ltd. Birniwa 6,023,115.00 6,023,115.00 6,008,057.21 17/10/2018 8 weeks 100 Completed

32

Constr of (1no.) Solar Powered Water Supply

Scheme Constituency Projects (2018 phase 1) Lot-

5 at GGSS Birniwa in Birniwa Constituency. Synclime Nig. Ltd. Birniwa 6,022,276.00 6,022,276.00 6,007,220.31 17/10/2018 8 weeks 100 Completed

33

Constr of (7no.) Hand Pumps Water Supply Scheme

Constituency Projects (2018 phase 1) Lot-2 at

Bagudu, Dugujaba, Gangara Nabunu, Wada

Tsohuwa Tudu, Jan Zomo, Babbar Riga and

Yarkirya in babura Constituency. Mufabamex Concept Babura 5,100,676.00 5,100,676.00 5,100,676.00 17/10/2018 8 weeks 100 Completed

34

Constr of (5no.) Hand Pumps Water Supply Scheme

Constituency Projects (2018 phase 1) Lot-3 at

Kauyen Boka, Dukari, Kyaurawa, fagoje U/Iya and

Mungulo in Birnin Kudu Constituency. Nushe Business Resources B/kudu 3,656,467.50 3,656,467.50 3,647,326.34 17/10/2018 8 weeks 100 Completed

Balance C/F 798,562,084.72 906,863,128.77

2c

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

Balance B/F 798,562,084.72 906,863,128.77

35

Constr of (6no.) Hand Pumps Water Supply Scheme

Constituency Projects (2018 phase 1) Lot-10 at

Rahaina, Takalafiya, Jangwam Fulani, Tasgan Gabas,

Madamuwa and Garmaguwa Yamma in Guri

Constituency. A.Y.H. Investment Co. Guri 4,415,040.00 4,415,040.00 4,404,002.40 17/10/2018 8 weeks 100 Completed

36

Construction of (28NO.) Hand Pumps Water supply

scheme Constituency projects (2018 Phase I) Lot

13 at Gidan Danko, Bayan Gidan Wanka, Likindi,

Damutawa Kazage, Kukawa Fulani, Afasha, Lilon

Dan Baki, Tsalliyawa Kunguyun, Mahauta, Jabarna

Kauye, Fantagwal, Zagau Makera, Abirikyau T.

Gabas, Tsibiri, Masallacin M. Madibo, Gidan Tila,

Gangaren Kwalta, Yalleman K. Gabar. Gidan Atiku,

Kwanyoli, Gidan Hakimi, Jabarna, Darai Madobi,

Bayan Katarin, Yalayin Kolrori, Kandahar and

Sabon Kaye in Jahun Constituency. Jawad Global Resources Jahun 20,572,664.00 20,572,664.00 20,572,663.99 17/10/2018 8 weeks 100 Completed

37

Construction of (10NO.) Hand Pumps Water supply

scheme Constituency projects (2018 Phase I) Lot

16 at Yan Auta, Miyawa, Yalwan Fulani, Sabuwar

Unguwa, Nafara Alh. Uba, Sabuwar Raba, Yolal,

Jigawar Kiyawa, Ung. Dahiru Mai Gyada and

Mandela in Kiyawa Constituency. Demastbo Ventures Ltd. Jahun 7,377,825.00 7,377,825.00 7,377,825.00 17/10/2018 12 weeks 100 Completed

38

Construction of (25NO.) Hand Pumps Water supply

scheme Constituency projects (2018 Phase I) Lot 4

at Laraba, Zangon Farin Dutse, Kwanar Fado,

Kakibare, Sayasaya Sabuwar Yalwa, Gayawa Zai,

Kalusa, Gidan Kuka mainari, Dutsin Duru Ungullo

Kagara, Taju, Ruwan Baure, Lemunawa, Hora

Arewa, Dabawa Zango, Gidan Gawo, Kundi,

Tsangayar Jan Shuri, Kargo Mahauta Manhada and

Dilake in Dutse Constituency. Talaku Integrated Services Dutse 18,361,875.00 18,361,875.00 18,315,970.31 17/10/2018 12 weeks 100 Completed

Balance C/F 849,289,488.72 957,590,532.77

2d

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

Balance B/F 849,289,488.72 957,590,532.77

40

Construction of (10NO.) Hand Pumps Water supply

scheme Constituency projects (2018 Phase I) Lot

19 at Dan kawu Hardo Take, Tubus Hardo Gatag M.

Amadu, Gidan Dogo Hardo Ruwa, Abdullahi Balga

Hardo Dawa, Barmanawa Gari, Kunkurai Gari,

Akwai ALLAH Gari, Sabo mai Kalanda Hardo Juli,

Saidi Dogo Fulanin Gwata Gidan Rabo Fulani and

Zokoto in Sule Tankarkar Constituency. Lautai Genaral Investment S/tankarkar 7,377,825.00 7,377,825.00 7,377,825.00 17/10/2018 12 weeks 100 Completed

41

Construction of (15NO.) Hand Pumps Water supply

scheme Constituency projects (2018 Phase I) Lot 7

at Muku, Tsalle, Balashe, Fankami, Tsagwaye,

Jirima, Magatarin B/ALLAH, Doguwar Kuka,

Kwadage Dan karofi, Gwallawa, Kabawa,

Kwana,Zaidawa, Karangi and Koguran Tsohuwa in

Garki Constituency. A.D.Z. Global Services Ltd. Garki 18,884,580.00 18,884,580.00 18,884,580.00 17/10/2018 8 weeks 100 Completed

42

Construction of (1NO.) Water Collection Point

Constituency projects (2018 Phase I) Lot 9 at Rigar

Kangal in Taura Constituency. Nushe Business Resources Taura 1,199,677.50 1,199,677.50 1,196,678.31 17/10/2018 4 weeks 100 Completed

43

Construction of the (1 No.) Solar Powered Water

Supply Schemes 2018 Constituency Phase III

Projects (Lot-30) at Yan Duna in Miga

Constituency. Amia Integ. Service Nig Ltd. Miga 6,023,199.00 6,023,199.00 6,023,199.00 23/11/2018 8 weeks 100 Completed

44

Construction of the (1 No.) Solar Powered Water

Supply Schemes 2018 Constituency Phase III

Projects (Lot-27) at Muduga in Miga Constituency. Amia Integ. Service Nig Ltd. Miga 6,201,720.00 6,201,720.00 6,201,720.00 23/11/2018 8 weeks 100 Completed

45

Construction of the (1 No.) Solar Powered Water

Supply Schemes 2018 Constituency Phase III

Projects (Lot-37) at Botsotsuwa in Babura

Constituency. Mafabamex Concept Nig. Ltd. Babura 6,023,199.00 6,023,199.00 6,008,141.00 23/11/2018 8 weeks 100 Completed

46

Construction of the (1 No.) Solar Powered Water

Supply Schemes 2018 Constituency Phase III

Projects (Lot-34) at Maradawa in Kazaure

Constituency. Yanduna Ventures Ltd. Kazaure 6,023,115.00 6,023,115.00 6,008,057.21 23/11/2018 8 weeks 100 Completed

47

Construction of the (1 No.) Solar Powered Water

Supply Schemes 2018 Constituency Phase III

Projects (Lot-33) at Kanti Gabas in Kazaure

Constituency. Yanduna Ventures Ltd. Kazaure 6,023,115.00 6,023,115.00 6,008,057.21 23/11/2018 8 weeks 100 Completed

Balance C/F 907,045,919.22 1,015,346,963.27

2e

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

Balance B/F 907,045,919.22 1,015,346,963.27

48

Construction of the (1 No.) Solar Powered Water

Supply Schemes 2018 Constituency Phase III

Projects (Lot-38) at Achiya in Babura

Constituency. Mufabamex Concept Ltd. Babura 6,023,199.00 6,023,199.00 6,008,141.00 23/11/2018 8 weeks 100 Completed

49

Construction of the (1 No.) Solar Powered Water

Supply Schemes 2018 Constituency Phase III

Projects (Lot-4) at Lawandi in Birniwa

Constituency. Limis Brother & Co., Birniwa 6,023,115.00 6,023,115.00 6,008,054.06 23/11/2018 8 weeks 100 Completed

50

Construction of (3NO.) Water Collection Point

Constituency Projects (2018 Phase 1) Lot-12 at

Walawa (2NO.) and Kofar Tukura (1NO.) in Hadejia

Constituency. Step by Step Integrated Hadejia 3,600,002.70 3,600,002.70 3,591,002.69 23/10/2018 6 weeks 100 Completed

51

Construction of the (1 No.) Solar Powered Water

Supply Schemes 2018 Constituency Phase III

Projects (Lot-5) at Kukuma in Buji Constituency. Limis Brother & Co., Buji 6,023,115.00 6,023,115.00 6,008,057.21 23/11/2018 8 weeks 100 Completed

52

Construction of the (1 No.) Solar Powered Water

Supply Schemes 2018 Constituency Phase III

Projects (Lot-17) at Kirilla in Maigatari

Constituency. Limis Brother & Co., Maigatari 6,023,115.00 6,023,115.00 6,008,057.21 23/11/2018 8 weeks 100 Completed

53

Construction of the (1 No.) Solar Powered Water

Supply Schemes 2018 Constituency Phase III

Projects (Lot-43) at Gayawa Tudu in Gagarawa

Constituency. Limis Brother & Co., Gagarawa 6,023,115.00 6,023,115.00 6,008,054.06 23/11/2018 8 weeks 100 Completed

54

Construction of the (1 No.) Solar Powered Water

Supply Schemes 2018 Constituency Phase III

Projects (Lot-44) at San Amarya in Gagarawa

Constituency. Limis Brother & Co., Gagarawa 6,023,115.00 6,023,115.00 6,023,115.00 23/11/2018 8 weeks 100 Completed

55

Construction of the (1 No.) Solar Powered Water

Supply Schemes 2018 Constituency Phase III

Projects (Lot-36) at Matsa in Malam Madori

Constituency. Hambiscon Nig. Ltd. M/Madori 6,023,199.00 6,023,199.00 6,023,199.00 23/11/2018 8 weeks 100 Completed

56

Construction of the (1 No.) Solar Powered Water

Supply Schemes 2018 Constituency Phase III

Projects (Lot-11) at Kila Kofar Arewa in Gwaram

Constituency. Jag & H Intgrated Serv. Ltd. Gwaram 6,023,220.00 6,023,220.00 6,023,220.00 23/11/2018 8 weeks 100 Completed

57

Construction of the (1 No.) Solar Powered Water

Supply Schemes 2018 Constituency Phase III

Projects (Lot-31) at Burji in Miga Constituency. A. Barde Global Concept Miga 6,023,010.00 6,023,010.00 6,007,952.47 23/11/2018 8 weeks 100 Completed

58

Construction of the (1 No.) Solar Powered Water

Supply Schemes 2018 Constituency Phase III

Projects (Lot-28) at Dabaka in Miga Constituency. A. Barde Global Concept Miga 6,023,010.00 6,023,010.00 6,007,952.47 23/11/2018 8 weeks 100 Completed

Balance C/F 970,877,134.92 1,079,178,178.97

2f

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

Balance B/F 970,877,134.92 1,079,178,178.97

59

Construction of the (1 No.) Solar Powered Water

Supply Schemes 2018 Constituency Phase III

Projects (Lot-15) at Guri in Guri Constituency. A. Y. H. Investment Company Guri 6,023,010.00 6,023,010.00 6,007,952.47 23/11/2018 8 weeks 100 Completed

60

Construction of the (1 No.) Solar Powered Water

Supply Schemes 2018 Constituency Phase III

Projects (Lot-16) at Arin in Guri Constituency. A. Y. H. Investment Company Guri 6,023,010.00 6,023,010.00 6,007,952.47 23/11/2018 8 weeks 100 Completed

61

Construction of the (1 No.) Solar Powered Water

Supply Schemes 2018 Constituency Phase III

Projects (Lot-13) at Dawa in Guri Constituency. A. y. H. Investment Company Guri 6,023,010.00 6,023,010.00 6,007,952.47 23/11/2018 8 weeks 100 Completed

62

Construction of the (1 No.) Solar Powered Water

Supply Schemes 2018 Constituency Phase III

Projects (Lot-14) at ArinJasko in Guri

Constituency. A. Y. H. Investment Company Guri 6,023,010.00 6,023,010.00 6,007,952.47 23/11/2018 8 weeks 100 Completed

63

Construction of the (1 No.) Solar Powered Water

Supply Schemes 2018 Constituency Phase III

Projects (Lot-12) at Musari in Guri Constituency. A. Y. H. Investment Company Guri 6,023,010.00 6,023,010.00 6,007,952.47 23/11/2018 8 weeks 100 Completed

64

Construction of the (1 No.) Solar Powered Water

Supply Schemes 2018 Constituency Phase III

Projects (Lot-9) at Juma'ar Yunusa in Kafin Hausa

Constituency. Tosarawa Global Nig. Ltd. K/Hausa 6,023,010.00 6,023,010.00 6,023,010.00 23/11/2018 8 weeks 100 Completed

65

Construction of the (1 No.) Solar Powered Water

Supply Schemes 2018 Constituency Phase III

Projects (Lot-8) at Autako in Kafin Hausa

Constituency. Mugin Investment Nig. Ltd. K/Hausa 6,023,220.00 6,023,220.00 6,008,161.95 23/11/2018 8 weeks 100 Completed

66

Construction of the (1 No.) Solar Powered Water

Supply Schemes 2018 Constituency Phase III

Projects (Lot-6) at Majefarin Yamma in Kafin Hausa

Constituency. Mugin Investment Nig. Ltd. K/Hausa 6,023,220.00 6,023,220.00 6,008,161.95 23/11/2018 8 weeks 100 Completed

67

Construction of the (1 No.) Solar Powered Water

Supply Schemes 2018 Constituency Phase III

Projects (Lot-7) at Ansaya in Kafin Hausa

Constituency. Mungin Investment Nig. Ltd. K/Hausa 6,023,220.00 6,023,220.00 6,008,161.95 23/11/2018 8 weeks 100 Completed

68

Construction of the (1 No.) Solar Powered Water

Supply Schemes 2018 Constituency Phase III

Projects (Lot-41) at Babbar Riga in Malam Madori

Constituency. Step By Step intgrated Servic M/madori 6,023,125.00 6,023,125.00 6,008,067.18 23/11/2018 8 weeks 100 Completed

69

Construction of the (1 No.) Solar Powered Water

Supply Schemes 2018 Constituency Phase III

Projects (Lot-32) at Bagade Gari in Sule Tankarkar

Constituency. Danfatu & Sons Nig. Ltd. S/tankarkar 6,023,115.00 6,023,115.00 6,008,057.21 23/11/2018 8 weeks 100 Completed

Balance C/F 1,037,131,094.92 1,145,432,138.97

2g

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

Balance B/F 1,037,131,094.92 1,145,432,138.97

70

Construction of the (1 No.) Solar Powered Water

Supply Schemes 2018 Constituency Phase III

Projects (Lot-24) at Burdawa S/Gabas in Gwiwa

Constituency. Jignaj Global Constructions Gwiwa 6,023,220.00 6,023,220.00 6,008,161.95 23/11/2018 8 weeks 100 Completed

71

Construction of the (1 No.) Solar Powered Water

Supply Schemes 2018 Constituency Phase III

Projects (Lot-25) at Buntusun Abuja in Gwiwa

Constituency. Jignaj Global Constructions Gwiwa 6,023,220.00 6,023,220.00 6,008,161.95 23/11/2018 8 weeks 100 Completed

72

Construction of the (1 No.) Solar Powered Water

Supply Schemes 2018 Constituency Phase III

Projects (Lot-39) at Sankara in Ringim

Constituency. Marb Engr. Multi-Services Ringim 6,023,199.00 6,023,199.00 6,023,199.00 23/11/2018 8 weeks 100 Completed

73

Supply of the (1 No.) Solar Powered Water Supply

Schemes 2018 Constituency Phase III Projects +

(3no. Saflex pumps) (Lot-40) at Karshi, Fachama

and Gamoji in Ringim Constituency. Marb Engr. Multi-Services Ringim 10,872,138.69 10,872,138.69 10,872,138.69 23/11/2018 8 weeks 100 Completed

74

Construction of the (1 No.) Solar Powered Water

Supply Schemes 2018 Constituency Phase III

Projects (Lot-35) at Andaza Kudu in Kiyawa

Constituency. Farham Intgratred Resources Kiyawa 6,023,115.00 6,023,115.00 6,023,115.00 23/11/2018 8 weeks 100 Completed

75

Construction of the (1 No.) Solar Powered Water

Supply Schemes 2018 Constituency Phase III

Projects (Lot-2) at Kaigamari in Auyo

Constituency. Madanta Global Nig. Ltd. Auyo 6,023,220.00 6,023,220.00 6,023,220.00 23/11/2018 8 weeks 100 Completed

76

Construction of the (1 No.) Solar Powered Water

Supply Schemes 2018 Constituency Phase III

Projects (Lot-19) at Bakawa in Maigatari

Constituency. Alkawakeb Global Concept Maigatari 6,023,115.00 6,023,115.00 6,008,057.21 23/11/2018 8 weeks 100 Completed

77

Upgrading of 1no.) motorized Water Supply

Schemes 2018 Constituency Phase III Projects (Lot-

22) at Digijin in Fagam Constituency. Pullad Global Consultant Gwaram 10,872,138.69 10,872,138.69 10,872,138.69 23/11/2018 8 weeks 100 Completed

78

Construction of the (1 No.) Solar Powered Water

Supply Schemes (2018 Phase III) Constituency

Projects at Shiyo in Auyo Constituency. Alaska Genral Enterprises Auyo 6,023,010.00 6,023,010.00 6,023,010.00 23/11/2018 8 weeks 100 Completed

79

Construction of the (1 No.) Solar Powered Water

Supply Schemes (2018 Phase III) Constituency

Projects at Garin Jama'u in Gagarawa Constituency. Altima Intgrated Services Gagarawa 6,023,010.00 6,023,010.00 6,023,010.00 23/11/2018 8 weeks 100 Completed

80

Construction of the (1 No.) Solar Powered Water

Supply Schemes Constituency Projects (2018

Phase II) Lot-10 at Takalafiya in Miga Constituency. Amia Integ. Service Nig Ltd. Miga 6,023,199.00 6,023,199.00 6,023,199.00 23/11/2018 8 weeks 100 Completed

Balance C/F 1,113,083,680.30 1,221,384,724.35

2h

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

Balance B/F 1,113,083,680.30 1,221,384,724.35

81

Construction of the (1 No.) Solar Powered Water

Supply Schemes Constituency Projects (2018

Phase II) Lot-9 at Garbo in Miga Constituency. Amia Integ. Service Nig Ltd. Miga 6,023,115.00 6,023,115.00 6,023,115.00 23/11/2018 8 weeks 100 Completed

82

Construction of the (1 No.) Solar Powered Water

Supply Schemes Constituency Projects (2018

Phase II) Lot-47 at Gidan Gona in Kazaure

Constituency. Lautai Genaral Investment Kazaur e 6,023,220.00 6,023,220.00 6,008,161.95 23/11/2018 8 weeks 100 Completed

83

Construction of the (1 No.) Solar Powered Water

Supply Schemes Constituency Projects (2018

Phase II) Lot-41 at Maguwa in Kirikasamma

Constituency. Talaku Intgrated Services K/Kasamma 6,023,220.00 6,023,220.00 6,023,220.00 23/11/2018 8 weeks 100 Completed

84

Construction of the (1 No.) Solar Powered Water

Supply Schemes Constituency Projects (2018

Phase II) Lot-35 at Kakudi Babba in Suletankarkar

Constituency. Talaku Intgrated Services Sule tankarkar 6,023,010.00 6,023,010.00 6,023,010.00 23/11/2018 8 weeks 100 Completed

85

Construction of the (1 No.) Solar Powered Water

Supply Schemes Constituency Projects (2018

Phase II) Lot-39 at Solari in Kirikasamma

Constituency. Loyalty Properties Ltd. Kirikasamma 6,023,115.00 6,023,115.00 6,008,054.06 23/11/2018 8 weeks 100 Completed

86

Construction of the (1 No.) Solar Powered Water

Supply Schemes Constituency Projects (2018

Phase II) Lot-27 at Babura Yamma in Babura

Constituency. Mufabamex Concept Ltd. Babura 6,014,355.00 6,014,355.00 5,999,319.11 23/11/2018 8 weeks 100 Completed

87

Construction of the (1 No.) Solar Powered Water

Supply Schemes Constituency Projects (2018

Phase II) Lot-50 at Gizo in Kazaure Constituency. Yanduna Ventures Ltd. Kazaure 6,023,220.00 6,023,220.00 6,008,161.95 23/11/2018 8 weeks 100 Completed

88

Construction of the (1 No.) Solar Powered Water

Supply Schemes Constituency Projects (2018

Phase II) Lot-49 at Yar'Unguwa in Kazaure

Constituency. Yanduna Ventures Ltd. Kazaure 6,023,220.00 6,023,220.00 6,008,161.95 23/11/2018 8 weeks 100 Completed

89

Construction of the (1 No.) Solar Powered Water

Supply Schemes Constituency Projects (2018

Phase II) Lot-3 at Jam'ar Ayan in Auyo

Constituency. Khairussabah Nig. Ltd. Auyo 6,023,115.00 6,023,115.00 6,008,057.21 23/11/2018 8 weeks 100 Completed

90

Construction of the (1 No.) Solar Powered Water

Supply Schemes Constituency Projects (2018

Phase II) Lot-36 at Shadamai in Yankwashi

Constituency. Granitoids Engr. Services Ltd Yankwashi 6,023,220.00 6,023,220.00 6,007,952.47 23/11/2018 8 weeks 100 Completed

91

Construction of the (1 No.) Solar Powered Water

Supply Schemes Constituency Projects (2018

Phase II) Lot-37 at Karkarna in Yankwashi

Constituency. Granitoids Engr. Services Ltd Yankwashi 6,023,010.00 6,023,010.00 6,007,952.47 23/11/2018 8 weeks 100 Completed

92

Construction of the (1 No.) Solar Powered Water

Supply Schemes Constituency Projects (2018

Phase II) Lot-1 at Anauya in Auyo Constituency. Farham Intgratred Resources Auyo 6,023,220.00 6,023,220.00 6,007,952.47 23/11/2018 8 weeks 100 Completed

Balance C/F 1,185,352,720.30 1,293,653,764.35

2i

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

Balance B/F 1,185,352,720.30 1,293,653,764.35

93

Construc tion of the (1 No.) S ola r P owe re d Wa te r

S upply S c he me s Cons titue nc y P roje c ts (2018

P ha se II) Lot- 44 a t Kuzunzumi in Ka nya Ba bba

Cons titue nc y. Limis Brother & Co., Babura 6,023,115.00 6,023,115.00 6,008,054.06 23/11/2018 8 weeks 100 Completed

94

Construc tion of the (1 No.) S ola r P owe re d Wa te r

S upply S c he me s Cons titue nc y P roje c ts (2018

P ha se II) Lot- 24 a t Ka ma in Ma iga ta ri Cons titue nc y. Limis Brother & Co., Maigatari 6,023,115.00 6,023,115.00 6,008,057.21 23/11/2018 8 weeks 100 Completed

95

Construc tion of the (1 No.) S ola r P owe re d Wa te r

S upply S c he me s Cons titue nc y P roje c ts (2018

P ha se II) Lot- 25 a t Dira ni in Ma iga ta ri Cons titue nc y. Limis Brother & Co., Maigatari 6,023,115.00 6,023,115.00 6,008,057.21 23/11/2018 8 weeks 100 Completed

96

Construc tion of the (1 No.) S ola r P owe re d Wa te r

S upply S c he me s Cons titue nc y P roje c ts (2018

P ha se II) Lot- 23 a t Ma ifa ri in Ma ga ta ri Cons titue nc y. Limis Brother & Co., Magatari 6,023,010.00 6,023,010.00 6,007,952.48 23/11/2018 8 weeks 100 Completed

97

Construc tion of the (1 No.) S ola r P owe re d Wa te r

S upply S c he me s Cons titue nc y P roje c ts (2018

P ha se II) Lot- 40 a t Ila lla h in Kirika sa mma

Cons titue nc y. Sahal Bin Nig. Ltd. Kirikasamma 6,023,220.00 6,023,220.00 6,008,161.95 23/11/2018 8 weeks 100 Completed

98

Construc tion of the (1 No.) S ola r P owe re d Wa te r

S upply S c he me s Cons titue nc y P roje c ts (2018

P ha se II) Lot- 38 a t Kira misa u in Kirika sa mma

Cons titue nc y. Sahal Bin Nig. Ltd. Kirikasamma 6,023,220.00 6,023,220.00 6,023,220.00 23/11/2018 8 weeks 100 Completed

99

Construc tion of the (1 No.) S ola r P owe re d Wa te r

S upply S c he me s Cons titue nc y P roje c ts (2018

P ha se II) Lot- 16 a t Rora n Ma la ma i in Gwiwa

Cons titue nc y. Jignaj Global Constructions Gwiwa 6,023,220.00 6,023,220.00 6,008,161.95 23/11/2018 8 weeks 100 Completed

100

Construc tion of the (1 No.) S ola r P owe re d Wa te r

S upply S c he me s Cons titue nc y P roje c ts (2018

P ha se II) Lot- 44 a t Da ushe in Ringim Cons titue nc y. Marb Engr. Multi-Services Ringim 6,023,115.00 6,023,115.00 6,023,115.00 23/11/2018 8 weeks 100 Completed

101

Construc tion of the (1 No.) S ola r P owe re d Wa te r

S upply S c he me s Cons titue nc y P roje c ts (2018

P ha se II) Lot- 46 a t Ma ra wa in Ringim Cons titue nc y. Marb Engr. Multi-Services Ringim 6,023,220.00 6,023,220.00 6,023,220.00 23/11/2018 8 weeks 100 Completed

102

Construc tion of the (1 No.) S ola r P owe re d Wa te r

S upply S c he me s Cons titue nc y P roje c ts (2018

P ha se II) Lot- 7 a t Ba kwa rga in Buji Cons titue nc y. Limis Brother & Co., Buji 6,023,115.00 6,023,115.00 6,008,057.21 23/11/2018 8 weeks 100 Completed

103

Construc tion of the (1 No.) S ola r P owe re d Wa te r

S upply S c he me s Cons titue nc y P roje c ts (2018

P ha se II) Lot- 8 a t Gwa ngwa n in Buji Cons titue nc y. Limis Brother & Co., Buji 6,023,115.00 6,023,115.00 6,008,057.21 23/11/2018 8 weeks 100 Completed

104

Construc tion of the (1 No.) S ola r P owe re d Wa te r

S upply S c he me s Cons titue nc y P roje c ts (2018

P ha se II) Lot- 22 a t Ga rba ga l in Guri Cons titue nc y. A. Y. H. Investment Company Guri 6,023,010.00 6,023,010.00 6,007,952.47 23/11/2018 8 weeks 100 Completed

Balance C/F 1,257,630,310.30 1,365,931,354.35

2j

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

Balance B/F 1,257,630,310.30 1,365,931,354.35

105

Construction of the (1 No.) Solar Powered Water

Supply Schemes Constituency Projects (2018

Phase II) Lot-31 at Maijiruwa in Gagarawa

Constituency. Danfatu & Sons Nig. Ltd. Gagarawa 6,023,115.00 6,023,115.00 6,008,057.21 23/11/2018 8 weeks 100 Completed

106

Construction of the (1 No.) Solar Powered Water

Supply Schemes Constituency Projects (2018

Phase II) Lot-2 at Kwazumo in Auyo Constituency. Danfatu & Sons Nig. Ltd. Auyo 6,023,220.00 6,023,220.00 6,008,161.95 23/11/2018 8 weeks 100 Completed

107

Construction of the (1 No.) Solar Powered Water

Supply Schemes Constituency Projects (2018

Phase II) Lot-21 at Abunabo in Guri Constituency. A. Y. H. Investment Company Guri 6,023,010.00 6,023,010.00 6,007,952.47 23/11/2018 8 weeks 100 Completed

108

Construction of the (1 No.) Solar Powered Water

Supply Schemes Constituency Projects (2018

Phase II) Lot-20 at Zugo in Guri Constituency. A. Y. H. Investment Company Guri 6,023,010.00 6,023,010.00 6,007,952.47 23/11/2018 8 weeks 100 Completed

109

Construction of the (1 No.) Solar Powered Water

Supply Schemes Constituency Projects (2018

Phase II) Lot-19 at Garmaguwa Yamma in Guri

Constituency. A. Y. H. Investment Company Guri 6,023,010.00 6,023,010.00 6,007,952.48 23/11/2018 8 weeks 100 Completed

110

Construction of the (1 No.) Solar Powered Water

Supply Schemes Constituency Projects (2018

Phase II) Lot-18 at Garmaguwa Gabas in Guri

Constituency. A. Y. H. Invest. Co. Guri 6,023,010.00 6,023,010.00 6,007,952.47 23/11/2018 8 weeks 100 Completed

111

Construction of the (1 No.) Solar Powered Water

Supply Schemes Constituency Projects (2018

Phase II) Lot-17 at Zugobiya in Guri Constituency. A. Y. H. Invest. Co. Guri 6,075,720.00 6,075,720.00 6,060,530.70 23/11/2018 8 weeks 100 Completed

112

Construction of the (1 No.) Solar Powered Water

Supply Schemes Constituency Projects (2018

Phase II) Lot-28 at Unguwar Dinya in Roni

Constituency. Hikima Synergy Gen. Entp. Roni 6,023,199.00 6,023,199.00 6,008,141.00 23/11/2018 8 weeks 100 Completed

113

Construction of the (1 No.) Solar Powered Water

Supply Schemes Constituency Projects (2018

Phase II) Lot-30 at Amaryawa in Roni

Constituency. Hikima Synergy Gen. Entp. Roni 6,023,220.00 6,023,220.00 6,008,161.95 23/11/2018 8 weeks 100 Completed

114

Construction of the (1 No.) Solar Powered Water

Supply Schemes Constituency Projects (2018

Phase II) Lot-29 at Unguwar Mani in Roni

Constituency. Hikima Synergy Gen. Entp. Roni 6,023,115.00 6,023,115.00 6,008,057.21 23/11/2018 8 weeks 100 Completed

Balance C/F 1,311,890,719.30 1,420,191,763.35

2k

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

Balance B/F 1,311,890,719.30 1,420,191,763.35

115

Construction of the (1 No.) Solar Powered Water

Supply Schemes Constituency Projects (2018

Phase II) at Kabala Jahun in Jahun Constituency. Dalari Constr Co. Jahun 6,023,115.00 6,023,115.00 6,008,057.21 23/11/2018 8 weeks 100 Completed

116

Construction of (5 No.) Hand Pump Water Supply

Schemes Constituency Projects (2018 Phase I) Lot-

21 at Gidan Nokia Fulani, Karkarna C/Gari, S/Fulani

Gurjiya, Karkarna Islamiyya and Ringim in

Yankwashi Constituency. Granitoids Engr. Services Ltd Yankwashi 3,644,025.00 3,644,025.00 3,634,914.93 17/10/2018 8 weeks 100 Completed

117

Construction of (4No.) Solar Powered Water

Supply Schemes at Garin ganau, Kwadage, Chika-

koshi and Kankaren Nagona in Babura L. G. A.

(Ringim Zone). Sims Global Resources Nig. Babura 24,093,300.00 24,093,300.00 24,093,300.00 12/12/2018 12 weeks 100 Completed

118

Construction of (1 No.) Solar Powered Water

Supply Schemes Constituency Projects (2018

Phase II) Lot-48 at Gwabbare in Kazaure

Constituency. Yanduna Ventures Ltd. Kazaure 6,023,220.00 6,023,220.00 6,008,161.95 23/11/2018 8 weeks 100 Completed

119

Construction of (1 No.) Solar Powered Water

Supply Schemes Constituency Projects (2018

Phase II) Lot-47 at Gidan Gona in Kazaure

Constituency. Yanduna Ventures Ltd. Kazaure 6,023,122.00 6,023,122.00 6,008,161.95 23/11/2018 8 weeks 100 Completed

120

Construction of the (1 No.) Solar Powered Water

Supply Schemes (2018 Phase III) Constituency

Projects (Lot-42) at Matara Galadima in

Kirikasamma Constituency. Bulangu Drilling Services K/kasamma 6,023,010.00 6,023,010.00 6,023,010.00 31/12/18 8 weeks 100 Completed

121

Construction of the (1 No.) Solar Powered Water

Supply Schemes (2018 Phase III) Constituency

Projects (Lot-29) at Garin Abdalla in Miga

Constituency. Xtrax 99 Integrated Services Miga 6,023,115.00 6,023,115.00 6,023,115.00 23/11/2018 8 weeks 100 Completed

122

Construction of the (1 No.) Solar Powered Water

Supply Schemes (2018 Phase II) Constituency

Projects (Lot-43) at Kanya Arewa in Kanya Babba

Constituency. Limis Brother & Co., Babura 6,023,010.00 6,023,010.00 6,007,952.48 23/11/2018 8 weeks 100 Completed

123

Construction of the (1 No.) Solar Powered Water

Supply Schemes 2018 Constituency (Phase III)

Projects (Lot-10) at Be-bayi in Kafin Hausa

Constituency. Tosarawa Global Nig. Ltd. K/Hausa 6,023,010.00 6,023,010.00 6,023,010.00 12/12/2018 8 weeks 100 Completed

124

Construction of Water Collection Point as

Constituency Projects (2018 Phase III) Lot-24 at

Tsohuwar Gwaram, Guduma, Katsinawa and

Dutsen Gandu in Gwaram Constituency. Farham Synergy Concept Ltd. Gwaram 5,011,996.00 5,011,996.00 5,011,995.96 18/12/2018 8 weeks 100 Completed

Balance C/F 1,380,778,632.30 1,489,079,676.35

2L

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

Balance B/F 1,380,778,632.30 1,489,079,676.35

126

Construction of Hand Pump Boreholes as

Constituency Projects (2018 Phase III) Lot-7 at

Gidan Nakuka, Makwai Fulani, Dandidi (4 No.),

Gidan Kato Furya, Gidan Badawai, Fulanin mai

Adu'a and Kukule in Gagarawa Constituencyi Farham Synergy Concept Ltd. Gagarawa 7,374,150.00 7,374,150.00 7,374,150.00 18/12/2018 8 weeks 100 Completed

127

Construction of Hand Pump Boreholes as

Constituency Projects (2018 Phase III) Lot-12 at

Limawa, Afaru, Giwaran, Kununu Zaki, Kuzan Iliya

and Kwazalewa Gidan Mafi in Kafin Hausa

Constituencyi Faahm Intgratred Resources K/Hausa 4,425,750.00 4,425,750.00 4,425,750.00 18/12/2018 6 weeks 100 Completed

128

Construction of Water Collection Point as

Constituency Projects (2018 Phase III) Lot-28 at

Ajaura (Pipe Line Extention) and Gidan Dauda

(W.C.Point) in Taura Constituency. Nushe Business Resources Taura 4,874,063.25 4,874,063.25 4,861,878.09 18/12/2018 8 weeks 100 Completed

129

Construction of Hand Pump Boreholes as

Constituency Projects (2018 Phase III) Lot-18 at

Majiya Secondary School in Taura Constituencyi Nushe Business Resources Taura 737,520.00 737,520.00 737,520.00 18/12/2018 4 weeks 100 Completed

130

Construction of Hand Pump Boreholes as

Constituency Projects (2018 Phase III) Lot-15 at

Kabobo Chaichai, 'Yanduna kawai, Dandalin Wailari,

Takwasha, Chaichai Makabarta and Amaguwa in

Ringim Constituencyi Marb Engr. Multi-Services Ringim 4,426,680.00 4,426,680.00 4,415,413.30 18/12/2018 8 weeks 100 Completed

131

Construction of Hand Pump Boreholes Water

Supply Schemes Constituency Projects (2018

Phase II) Lot-5 at Akurya, Limawa, Gumussawa,

Gabari, Yola Musa, Mawa, Bujaje, Jigawar Gabas,

Rigar Jauro Mato, Rigar Buba Salewa, Gulungulun,

Karsha, Suwameri, ALLAH kayi, Tumba gidan Baba

Sarki, Aduna Dikko, Shagewa, Yammarin A. Mato,

Shagen Yamma Danlalan Fulanin Village, Gamajan,

Kuloma, Sadingo Garin Mati, Babbar Jigawa,

Alhajerin Chiromari, Chakwasan, Guduwari Gidan

Gaiya, Mangari, Mawalan Tumunjira and Rigar

Buba Habbo in Bulangu Constituencyi Bulangu Drilling Services K/Hausa 25,036,410.00 25,036,410.00 24,973,818.97 18/12/2018 12 weeks 100 Completed

Balance C/F 1,423,226,525.55 1,531,527,569.60

2m

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

Balance B/F 1,423,226,525.55 1,531,527,569.60

132

Construction of Hand Pump Boreholes Water

Supply Schemes Constituency Projects (2018

Phase II) Lot-19 at Alagarno Gari Haru, Tarawa

Fulani, Haro Yale, Babbar Dinya, Balarabe, Harso

Sale, Gidan Nomau and Gidan M/manu in Maigatari

Constituency. Nadada Ventures Nig. Ltd. Maigatari 5,869,920.00 5,869,920.00 5,869,920.00 18/12/2018 8 weeks 100 Completed

133

Construction of Hand Pump Boreholes Water

Supply Schemes Constituency Projects (2018

Phase II) Lot-23 at Girgi Gari, Tsangaya,

Jemau,Sabon Layi Unguwar Barde Banaga,

Sakataren Muyatti ALLAH, Hardo Yahaya Balkindo,

Hardo Lauwali Fulanin Girgi Yamma, Zanguna,

Jumawa Gari, Nazau Gari, Fulanin Walawa Gidan

Haruna Babe, Dungundun Gari and Gidan Shuaibu

Ajiya HardoIla in Sule Tankarkar Constituency. Nushe Business Resources S/tankarkar 8,844,192.00 8,844,192.00 8,822,081.52 18/12/2018 8 weeks 100 Completed

134

Construction of Hand Pump Boreholes Water

Supply Schemes Constituency Projects (2018

Phase II) Lot-18 at Tsotsawa Fulani and Bakata

Cikin Gari in Kiyawa Constituency. Faahm Intgratred Resources Kiyawa 1,467,730.00 1,467,730.00 1,467,730.00 18/12/2018 4 weeks 100 Completed

135

Construction of Hand Pump Boreholes Water

Supply Schemes Constituency Projects (2018

Phase II) Lot-16 at Rangina, Kantamari, Gangara,

Motso, Karumi, Mai Kunama, Rugar Kota Buhun

Karangiya, Meleri Marke, Masama Karama, Fulanin

Kagori, Kaugama Yamma, Kanwar Gamawa, Manda

Mai Gawo and Anguwar Habulle in Kaugama

Constituency. Faahm Intgratred Resources Kaugama 14,569,232.00 14,569,232.00 14,569,232.00 18/12/2018 10 weeks 100 Completed

136

Construction of Hand Pump Boreholes Water

Supply Schemes Constituency Projects (2018

Phase II) Lot-8 at Firya, Garin Inu, Zaro, Dan Daga

Arewa and Habatsai in Gagarawa Constituency. Farham Synergy Concept Ltd. Gagarawa 3,687,075.00 3,687,075.00 3,687,075.00 18/12/2018 6 weeks 100 Completed

Balance C/F 1,457,664,674.55 1,565,965,718.60

2n

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

Balance B/F 1,457,664,674.55 1,565,965,718.60

137

Construction of Water Collection Point as

Constituency Projects (2018 Phase II) Lot-29 at

Unguwar Kanya T/Gwaram, Shiwo Sara, Sakuwa

Sara, Lukutu, Innakawa, Maruta cikin Gari, Yaddare

Kila, Unguwar kudu Z/nagogo, Gogurawa Yamma

Z/Nagogo, Lafiya Tsangarwa Shabewa

Tsangarwa,Fasa Ganga T/Gwaram, Sakwaya

Maruta Tsahira T/Gwaram GGUSS Gwaram and

Salmande in Gwaram Constituency. Jag & H Intgrated Services Ltd. Gwaram 22,686,282.00 22,686,282.00 22,686,281.10 18/12/2018 12 weeks 100 Completed

138

Construction of Water Collection Point as

Constituency Projects (2018 Phase II) Lot-28 at

Tsamiyar Osi, Ahabab Rasulillahi Ado Tela Gana,

Layin Babar Sardauna, Tudun Alhazai, College of

Education, Kofar Danmakwayo, Dantanoma

S/Kwalta, Layin GidanGalaba, Layin Gidan Dallatu,

Dantanoma L/Mari Audu, Gidan Gawo, Egoni Sabon

Layi, Famfom Gawo, Masallacin J/Gabas and

Masallacin Yarabawa in Gumel Constituency. Farham Synergy Concept Ltd. Gumel 20,165,584.00 20,165,584.00 20,165,583.99 18/12/2018 12 weeks 100 Completed

139

Construction of Hand Pump Boreholes Water

Supply Schemes Constituency Projects (2018

Phase II) Lot-3 at Dagolori, Fulanin Mariye,

Buhunni, Fulanin Nguwa, Fajiginari, Medori,

Birniwa Unguwar Mangawa, Birniwa T/kudu,

Kadairi, Goruban Tingiri and Gidan usaini wanzam

in Birniwa Constituency. Kafiyama Gen. Enterprises Birniwa 8,833,860.00 8,833,860.00 8,811,775.35 18/12/2018 6 weeks 100 Completed

140

Construction of Hand Pump Boreholes as

Constituency Projects (2018 Phase II) Lot-15 at

Rabo Fulani (4No), Kankaren Jemawa, Jolowa

Fulani, Sansami, Toge, Halladu, Kwadabe Fulanin

Shuaibu, Dan Maakeri, Fulanin Tsamiyar Kwance,

Fulanin Yamma, Kwanar Kuzunzumi and Dorawar

Waje in Kanya Babba Constituency. Deetech Nig. Ltd. Babura 11,072,250.00 11,072,250.00 11,072,250.00 18/12/2018 10 weeks 100 Completed

141

Construction of Hand Pump Boreholes Water

Supply Schemes Constituency Projects (2018

Phase III) Lot-3 at Kupsa, Fulanin Karda, Barbura,

Baltori, Zigidimi, Marge and Busugu Abdu in

Birniwa Constituency. Kafiyama Gen. Enterprises Birniwa 5,330,906.00 5,330,906.00 5,317,578.73 31/12/18 8 weeks 100 Completed

Balance C/F 1,525,753,556.55 1,634,054,600.60

2O

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

Balance B/F 1,457,664,674.55 1,565,965,718.60

137

Construction of Water Collection Point as

Constituency Projects (2018 Phase II) Lot-29 at

Unguwar Kanya T/Gwaram, Shiwo Sara, Sakuwa

Sara, Lukutu, Innakawa, Maruta cikin Gari, Yaddare

Kila, Unguwar kudu Z/nagogo, Gogurawa Yamma

Z/Nagogo, Lafiya Tsangarwa Shabewa

Tsangarwa,Fasa Ganga T/Gwaram, Sakwaya

Maruta Tsahira T/Gwaram GGUSS Gwaram and

Salmande in Gwaram Constituency. Jag & H Intgrated Services Ltd. Gwaram 22,686,282.00 22,686,282.00 22,686,281.10 18/12/2018 12 weeks 100 Completed

138

Construction of Water Collection Point as

Constituency Projects (2018 Phase II) Lot-28 at

Tsamiyar Osi, Ahabab Rasulillahi Ado Tela Gana,

Layin Babar Sardauna, Tudun Alhazai, College of

Education, Kofar Danmakwayo, Dantanoma

S/Kwalta, Layin GidanGalaba, Layin Gidan Dallatu,

Dantanoma L/Mari Audu, Gidan Gawo, Egoni Sabon

Layi, Famfom Gawo, Masallacin J/Gabas and

Masallacin Yarabawa in Gumel Constituency. Farham Synergy Concept Ltd. Gumel 20,165,584.00 20,165,584.00 20,165,583.99 18/12/2018 12 weeks 100 Completed

139

Construction of Hand Pump Boreholes Water

Supply Schemes Constituency Projects (2018

Phase II) Lot-3 at Dagolori, Fulanin Mariye,

Buhunni, Fulanin Nguwa, Fajiginari, Medori,

Birniwa Unguwar Mangawa, Birniwa T/kudu,

Kadairi, Goruban Tingiri and Gidan usaini wanzam

in Birniwa Constituency. Kafiyama Gen. Enterprises Birniwa 8,833,860.00 8,833,860.00 8,811,775.35 18/12/2018 6 weeks 100 Completed

140

Construction of Hand Pump Boreholes as

Constituency Projects (2018 Phase II) Lot-15 at

Rabo Fulani (4No), Kankaren Jemawa, Jolowa

Fulani, Sansami, Toge, Halladu, Kwadabe Fulanin

Shuaibu, Dan Maakeri, Fulanin Tsamiyar Kwance,

Fulanin Yamma, Kwanar Kuzunzumi and Dorawar

Waje in Kanya Babba Constituency. Deetech Nig. Ltd. Babura 11,072,250.00 11,072,250.00 11,072,250.00 18/12/2018 10 weeks 100 Completed

141

Construction of Hand Pump Boreholes Water

Supply Schemes Constituency Projects (2018

Phase III) Lot-3 at Kupsa, Fulanin Karda, Barbura,

Baltori, Zigidimi, Marge and Busugu Abdu in

Birniwa Constituency. Kafiyama Gen. Enterprises Birniwa 5,330,906.00 5,330,906.00 5,317,578.73 31/12/18 8 weeks 100 Completed

Balance C/F 1,525,753,556.55 1,634,054,600.60

2O

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

Balance B/F 1,525,753,556.55 1,634,054,600.60

142

Construction of Water Collection Points

Constituency Projects (2018 Phase II) Lot-26 at

Gomburawa, Kachallari and Gajarma in Birniwa

Constituency. Kafiyama Gen. Enterprises Birniwa 3,778,327.26 3,778,327.26 3,768,881.43 18/11/2018 8 weeks 100 Completed

143

Construction of Hand Pump Boreholes Water

Supply Schemes Constituency Projects (2018

Phase III) Lot-9 at Rigar Lamido Gandu Una, Rigar

Wuro Jigga, Gaduwa, Rigar Gapta, Maiyiri, Rigar

Lamido Nairi and Rigar Zuzu in Guri Constituency. A.Y.H. Investment Ltd. Guri 8,054,970.00 8,054,970.00 8,034,832.57 18/11/2018 10 weeks 100 Completed

144

Construction of Water Collection Points

Constituency Projects (2018 Phase II) Lot-34

aFilin Aya, Veterinary, Tsohuwar Quarters Yamma

da Tsamiya, Unguwar M. Danmodoji, Mains Goma

Shabiyu, Sule kudu Pri. Sch., Tsangayar M.

Liman,Kofar gidan Rabiu Hassan, Tsangayar M.

Haruna K/Arewa Gari, Gaban Gidan Najib

Councilor K/Gabas,Masallacin M. SaleDan Birib

K/Yamma and Kofar Gidan Aminu Ado Kofa in Sule

Tankarkar Constituency. Pullad Global Consultant S/tankarkar 14,716,363.00 14,716,363.00 14,678,572.09 18/12/2018 8 weeks 100 Completed

145

Construction of Hand Pump Boreholes Water

Supply Schemes Constituency Projects (2018

Phase III) Lot-14 at Rigar Wakiliya'a, Zubafinji and

Jarmari in Malam madori Constituency. Express Innovation Concept M/madori 2,213,340.00 2,213,340.00 2,207,806.65 18/12/2018 6 weeks 100 Completed

146

Renovation of (1No) Solar Powered Water supply

Scheme Constituency Projects (2018 Phase II) Lot-

26 at Jingino in Gwaram Constituency. Bakawa Multi Services Ltd. Gwaram 6,023,115.00 6,023,115.00 6,008,057.21 23/12/2018 8 weeks 100 Completed

147

Upgrading and Conversion of Wurma Town Water

Supply Schemes to Solar Powered Water supply

Scheme in Dutse L. G. A. Sims Global Resources Dutse 16,451,241.45 16,451,241.45 15,667,848.99 18/12/2018 8 weeks 100 Completed

148

Construction of Hand Pump Boreholes Water

Supply Schemes Constituency Projects (2018

Phase II) Lot-6 at Kiroro Duru Ward, Irwa Limawa

Ward, Laraba Kudai Ward, Zai cikin gari Kachi

Ward, Dutsawa J/Tsada Ward and Gadadin Kachi

Ward in Dutse Constituency Loyalty Properties Nig. Ltd. Dutse 4,402,440.00 4,402,440.00 4,402,440.00 18/12/2018 6 weeks 100 Completed

149

Construction of Hand Pump Boreholes Water

Supply Schemes Constituency Projects (2018

Phase III) Lot-6 at Yalwan Gabas, Rigar kaba,

Bakawa, Damagyal, Dabawa, Shiti, Ije, Tsungur,

Kwanar Fado and Junawo in Dutse Constituency Loyalty Properties Nig. Ltd. Dutse 7,337,800.00 7,337,800.00 7,337,799.99 18/12/2018 8 weeks 100 Completed

Balance C/F 1,572,279,911.81 1,680,580,955.86

2p

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

Balance B/F 1,572,279,911.81 1,680,580,955.86

150

Construction of Hand Pump Boreholes Water

Supply Schemes Constituency Projects (2018

Phase II) Lot-1 at Gamba kaban, Ayama K/bulama,

Aguza and Jejin Garo in Auyo Constituency Khairussabah Nig. Ltd. Auyo 2,947,560.00 2,947,560.00 2,947,560.00 18/12/2018 6 weeks 100 Completed

151

Construction of Hand Pump Boreholes Water

Supply Schemes Constituency Projects (2018

Phase II) at Fulanin Fateka, Fulanin Garin Malam

Makarantar Yamma and fulanin marma in Malam

madori Constituency. Limis Brothers & Co. M/madori 5,164,110.00 5,164,110.00 5,151,199.72 18/12/2018 6 weeks 100 Completed

152

Co ns truc tio n o f Hand P ump Bo reho les Water Supply

Schemes Co ns tituency P ro jec ts (2018 P has e II) Lo t-9 a t

Unguwar Sa idu, Fulanin Madachi, Unguwar s hege Unguwar

ka le ,Ufa la Fulanin Farjak, Gunzara , Zankawa, Gidan Wada

Daurawa, Gas a tanni Garki, Fulanin Raira i, Tafin Sa le , Kita ,

Yarkures he , Unguwar Gayya , Fulanin Dandara i, Kargo

Sabuwar Unguwa, Gidan Baki, Barmawa Gari, Abdawa

muku Ward, Rigar Hardo Ibrahim Ko re , Rigar Us man Mai

Bare , Ko re Sabuwar Unguwa, Gwadayawa, Kukar mekiya ,

Garin Makera , Rigar Malam Adamu kugi, Ko far Gidan

Na 'abi Garki, Ko far Gidan Liman Garki and Ko far Gidan

Cic i Garki in Garki Co ns tituency. ALLAH Abin Dogara Nig. Ltd. Garki 22,121,190.00 22,121,190.00 22,121,190.00 18/12/2018 12 weeks 100 Completed

153

Construction of Water Collection Point as

Constituency Projects (2018 Phase II) Lot-27 at

Umboro, Aujara, Kwanar Garki, Siyore Cikin Gari,

Magarya Garki and Sabuwar Unguwa in Garki

Constituency. ALLAH Abin Dogara Nig. Ltd. Garki 7,562,094.00 7,562,094.00 7,562,094.00 18/12/2018 8 weeks 100 Completed

154

Construction of Hand Pump Boreholes Water

Supply Schemes Constituency Projects (2018

Phase II) Lot-11 at Rigar Wakili Ya'a, Zubafinji,

Jarmari, Kwanar mai Labbo, Garin Malam S/Guga

and Tasgan Yamma in Guri Constituency. Limis Brothers & Co. Guri 4,426,380.00 4,426,380.00 4,415,314.05 18/12/2018 6 weeks 100 Completed

155

Construction of Hand Pump Boreholes Water

Supply Schemes Constituency Projects (2018

Phase III) Lot-4 at Bulangori in Buji Constituency. Limis Brothers & Co. Buji 737,625.00 737,625.00 735,780.93 18/12/2018 4 weeks 100 Completed

156

Construction of Hand Pump Boreholes Water

Supply Schemes Constituency Projects (2018

Phase II) Lot-4 at Gogel Kukuma, Rigar Shehu Kado

Kukuma, Dakawa Danbazau and Galadima Bebeji in

Buji Constituency. Limis Brothers & Co. Buji 2,950,920.00 2,950,920.00 2,943,542.70 18/12/2018 6 weeks 100 Completed

Balance C/F 1,618,189,790.81 1,726,490,834.86

2q

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

Balance B/F 1,618,189,790.81 1,726,490,834.86

157

Construction of Hand Pump Boreholes as

Constituency Projects (2018 Phase II) Lot-17 at

Farar Dutsanya and Gizo in Kazaure Constituency. Yanduna Ventures Ltd. Kazaure 1,472,730.00 1,472,730.00 1,472,730.00 18/12/2018 8 weeks 100 Completed

158

Construction of Hand Pump Boreholes Water

Supply Schemes Constituency Projects (2018

Phase II) at Takwardawa, Roni Gabas, Kalage

Gabas, Kwanar Ganji, Dage Baderi and Bahe Elde

in Roni Constituency. Hikima Synergy Gen. Enterp. Roni 4,422,096.00 4,422,096.00 4,411,040.76 18/12/2018 8 weeks 100 Completed

159

Construction of Hand Pump Boreholes Water

Supply Schemes Constituency Projects (2018

Phase III) Lot-16 at Roni Mission, Ruwan Dutse,

Jahoko, Rahamawa A. Roni and Marke in Roni

Constituency. Hikima Synergy Gen. Enterp. Roni 3,687,600.00 3,687,600.00 3,678,381.00 18/12/2018 8 weeks 100 Completed

160

Construction of Hand Pump Boreholes Water

Supply Schemes Constituency Projects (2018

Phase III) Lot-1 at Fulanin Tudun Yola, Jammutum

Arewa, Fulanin Aunaka, Koko and Rubunji in

Babura Constituency. Mufabamex Concept Nig. Ltd. Babura 3,688,650.00 3,688,650.00 3,679,428.38 18/12/2018 8 weeks 100 Completed

161

Construction of Hand Pump Boreholes Water

Supply Schemes Constituency Projects (2018

Phase III) Lot-7 at Gidan Nakuka, Makawai Fulani,

Fulanin Dandidi (4No.), Gidan Kato Furya, Gidan

badawai, Fulanin Mai adu'a and Kukule in

Gagarawa Constituency. Farham Synergy Concept Ltd. Gagarawa 7,374,150.00 7,374,150.00 7,374,150.00 22/12/2018 8 weeks 100 Completed

162

Upgrading and Conversion of Motorized Boreholes

to Solar Powered Water supply Scheme at

Mairakumi Town in Malam madori L. G. A. (Hadejia

Zone). Sims Global Resources Ltd M/madori 14,518,546.88 14,518,546.88 13,827,187.50 31/12/2018 8 weeks 100 Completed

163

Conversion of Motorized Pumps to Solar Powered

Water supply Scheme at Jama'are pump station in

K/hausa L.G.A. Sims Global Resources Ltd K/Hausa 14,998,281.46 14,998,281.46 14,284,077.58 31/12/2018 8 weeks 100 Completed

164

Conversion of Motorized Pumps to Solar Powered

Water supply Scheme at Unguwar kudu in Auyo

L.G.A. Sims Global Resources Ltd Auyo 16,809,055.11 16,809,055.11 16,008,623.91 31/12/2018 8 weeks 100 Completed

165

Construction of (1No.) Solar Powered Water supply

Schemes (2018 Phase III) Lot-42 at Medu Town in

Gagarawa Constituency. Dantatu Gen. Constr. Eng. Gagarawa 6,023,010.00 6,023,010.00 6,023,010.00 31/12/2018 8 weeks 100 Completed

Balance C/F 1,691,183,910.26 1,799,484,954.31

2r

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

Balance B/F 1,691,183,910.26 1,799,484,954.31

166

Construction of (1No.) Solar Powered Water supply

Schemes (2018 Phase III) Constituency Projects Lot-

46 at Magaji Kufai in Gagarawa Constituency. A.A. Aljazeera Agro Proc. Gagarawa 6,023,010.00 6,023,010.00 6,023,010.00 23/11/2018 8 weeks 100 Completed

167

Construction of new Solar Powered Pump Water

supply Schemes at Babura Tsallake in Babura

L.G.A. Sims Global Resources Ltd Babura 25,563,695.34 25,563,695.34 24,346,376.25 31/12/2018 8 weeks 100 Completed

168

Construction of Water Collection Points Water

supply Schemes Constituency Projects (2018

Phase II) Lot- 25 at Giginya, Achiya, Babura

Tsallake, Garin Ganau, Marken Biki, Gurfai,

Yammaulu, Botsotsuwa and Kwando in Babura

Constituency. Mufabamex Concept Ltd. Babura 11,037,269.25 11,037,269.25 11,009,679.08 18/12/2018 10 weeks 100 Completed

169

Construction of Water Collection Points

Constituency Projects (2018 Phase III) Lot- 20 at

Babura Islamiyya, Gangara Hanware, Baskwar and

Chirimbi in Babura Constituency. Mufabamex Concept Ltd. Babura 4,905,453.00 4,905,453.00 4,893,189.32 18/12/2018 8 weeks 100 Completed

170

Construction of Water Collection Points as

Constituency Projects (2018 Phase II) Lot- 30 at

Unguwar Sankira, Kandahar, Kofar Abdullahi

Ranbo, Unguwar Aminu Yusuf and garejin musan 'O'

in Hadejia Constituency. Alh. Umaru Babandoki Ltd. Hadejia 6,131,816.25 6,131,816.25 6,116,486.71 18/12/2018 8 weeks 100 Completed

171

Construction of Water Collection Points as

Constituency Projects (2018 Phase II) Lot-33 at

Gumuma in Roni Constituency. Hikima Synergy Gen. Enterp. Roni 1,226,363.25 1,226,363.25 1,223,297.34 18/12/2018 6 weeks 100 Completed

172

Construction of (30No). Hand Pumps at Tsakuware,

Gidan Hanau (Madatta), Timbau, Bekawa, Sabon

Gari, Kandiren Wailare, Zanguna, Damfar Jigawa,

Tsallake, Rugagen Melefe, Kafin Dan Yayi, Jaunare,

Unguwar Duhuwa, Gidan Gide, Gidan Maja,

Danzago, Naino Sabon Garin Jigawa, Tsugunau,

Garin Baki, Chirimbi Malamai, Rugar Hardo

Hassan, Ribinjin Manzo, Gurfan Batali, Jan Mutum,

Lambar Lululu, Rahar Hanau, Nabai, Kaya Harimi

and Kankaren Nagona in Babura L.G.A. Limis Brothers & Co. Babura 22,138,200.00 22,138,200.00 22,082,854.50 28/12/2018 15 weeks 100 Completed

173

Upgrading and Conversion of (2No.) Motorized

Boreholes to Solar Powered Water supply Scheme

at Gurfai in Babura L.G.A. of Ringim Zone, Garkon

Alli in Kiyawa L.G.A. of Dutse Zone, and

Construction of 1No. New Solar Water Supply

Schemes at Luddaga in Birnin kudu L.G.A. of Birnin

kudu Zone. Sims Global Resources Ltd State 31,275,783.95 31,275,783.95 29,786,460.90 31/12/2018 12 weeks 100 Completed

Balance C/F 1,777,347,301.30 1,885,648,345.35

2s

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

Balance B/F 1,777,347,301.30 1,885,648,345.35

174

Construction of (22No). Hand Pumps at Jankoli,

Unguwar Malam, Doguwar Dorawa, Gidan Kwano,

Bodawa, Digawar Kwando, Babajiya, Gidan Gitti,

Shafa, Kyara, Gage, Yantuba, Kaliya Jemawa,

Karkafawa, Fulanin Danmarke, Adugul Fulani,

Danmakera, Waje, Fulanin Masko and Aunaka Gari

in Babura L.G.A. Sir Welter Drilling & Gen. Serv Babura 16,234,680.00 16,234,680.00 16,194,093.30 28/12/2018 12 weeks 100 Completed

175

Construction of 50No Hand Pumps Boreholes at 50

Communities Across the State Sir Walter & Gen Serv State 36,897,000.00 36,897,000.00 36,897,000.00 5/3/2019 16 week 100 Completed

176

Construction of Hand Pump Boreholes Water

Supply Schemes Constituency Projects (2018

Phase II) Lot- 24 at Kawaye, Karkarna Bakin Titi,

Rauda durbe, Gwarta Karama and rauda Asibitin

Yankwashi Constituency. Granitoids Engr. Services Ltd. Yankwashi 3,685,082.10 3,685,082.10 3,675,869.39 18/12/2018 6 weeks 100 Completed

177

S upply a nd ins tla tion of (1nN0.) 30KVA Ge ne ra tor

se t 2018 Cons titue nc y proje c ts (Lots - 40) a t

Da buwa ra n in Ka uga ma c ons tiue nc y Madanta Global nig. Ltd Kaugama 3,740,625.00 3,740,625.00 3,740,625.00 23/11/2018 8 weeks 100 Completed

178

Constr of 11no. Hand pumps water supply

constituency project phase III 2018 (Lot- 7) at

Wallere, S/Gari, Redo, Shinfida, Daragi, Tsamiya,

Kafa Doya, Kundiga, Daurawa, Fara Fulani and

Sabuwar Yola in Gwiwa Jignaj Global Gwiwa 8,113,297.50 8,113,297.50 8,093,014.26 18/12/2018 12 weeks 100% Completed

179

Rehab of Some water supply scheme at Maidabaru

and Nazau in S/tankarkar L.G.A. Centuary Trade Ltd. S/Tankarkar 2,956,078.13 2,956,078.13 2,948,687.93 31/12/2018 8 weeks 100% Completed

180

Rehab and Maintenance of 5no. Water supply

scheme at Limawa A,B,C, Galamawa and Karnaya

in Dutse L.G.A. Limis Brothers & Co Dutse 3,585,192.19 3,585,192.19 3,414,468.75 31/12/2018 4 weeks 100% Completed

181

Rehab of 2no. Water supply Scheme at Dansure,

Roni and Gafaya town in K/Hausa L.G.A. Limis Brothers & Co Roni+K/Hausa 1,584,843.57 1,584,834.51 1,509,375.00 31/12/2018 4 weeks 100% Completed

182

Rehab of 4no. Water supply Scheme at Arbus,

Karoro, Dodorin Malan Audu, and Ronjin in

Kaugama L.G.A. Limis Brothers & Co Kaugama 3,611,204.57 3,611,204.57 3,439,242.45 31/12/2018 4 weeks 100% Completed

183

Rehab of 4no. Small towns water supply schemes

at Albasu main station, Albasu Hospital, Katangar

Lafiya and Chediyar Kuda in Gumel, Dutse and

Kazaure zones. Limis Brothers & Co State 4,932,998.44 4,932,998.44 4,698,093.75 31/12/2018 8 weeks 100 Completed

184

Construction of Water Collection Points as

Constituency Projects (2018 Phase Ii) Lot-32 at

Maigatari, Balarabe, Matoya, Bosuwa, Galadi,

Madana and Jajeri in Maigatari Constituency JAG & H Integrated Maigatari 8,822,443.00 8,822,444.00 8,822,444.00 14/1/2019 8 Weeks 100 Completed

Balance C/F 1,871,510,745.80 1,979,811,781.79

2t

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

Balance B/F 1,871,510,745.80 1,979,811,781.79

185

Construction of 1no Solar Powered water supply

scheme at Nafara in Kiyawa LGA, Dutse Zone Sims Global Resources Kiyawa 6,023,325.00 6,023,325.00 6,023,325.00 16/4/2019 8 weeks 100 Completed

186

Construction of 4No. Solar Powered Water supply

scheme at Danmarke, Wada,Kayarda and Garin

Baki in Babura LGA Ringim Zone Sims Global Resources Ringim 24,093,300.00 24,093,300.00 24,093,300.00 16/4/2019 12 Weeks 100 Completed

187

Rehabilitation of 2No Small Towns water supply

schemes at Yandamo and Malam Baki in Gumel

Zone Forte Technical Services Ltd Gumel 8,482,573.26 8,482,573.26 8,078,641.20 31/5/2019 8 weeks 100 Completed

188

Construction of 12No Hand Pump Boreholes water

supply schemes at Sule Fulanin Yandamo ( Gidan

Mallam) Fulanin Kwalawa( Gidan Kato dan Goma),

Fulanin dan Kiri ( Gidan Dan Bako) Garin Goto,

Fulanin Kukule Gabas ( Gidan Isah Kato) Fulanin

Malam Kadiri ( Gidan Sale), Fulanin Dantuwo (

Gidan Ingire), Dan Adama Gari, Fulanin Dan Adama

( Gidan Abdullahi), Dankira, Sabon Garin Dankirya

and Fulanin dan Kumbo ( Gidan Hardo Kan Doki) in

Sule Tankarkar Local Government Area Gumel

Zone. Al-Juraj Synergy Concept S/tankarkar 8,855,280.00 8,855,280.00 8,855,280.00 8/5/2019 12 weeks 100 Completed

189

Construction of 15No. Hand Pumps Boreholes

water supply scheme at Sinti, Garin Goshi, Fulanin

Masama ( Hardo Tamabya) Dantuwo Gari,

Dantuwo Tsangaya, Tashar Bala S/Tankarkar,

Balarabe Mai Gari, Fulanin Jalko( Gidan Rabiu)

Hardo Dan Kawo ( Fulanin Kuka Maidire), Sabon

Garin Dan Yarda, Fulanin Dan Banki ( Gidan

Sha'aibu Jikan Hajja), Fulanin Tiriki ( Hardo Ilu),

Fulanin Charko(Gidan Dabbi) and Ma'azu Gidan

Salisu Tifa in Sule Tankarkar Local Government

Area, Gumel Zone Al-Kawakeb Global Concept S/Tankarkar 11,069,100.00 11,069,100.00 11,069,100.00 8/5/2019 12 weeks 100 Completed

Balance C/F 1,921,551,750.80 2,029,852,786.79

2u

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

Balance B/F 1,921,551,750.80 2,029,852,786.79

190

Construction of 22No Hand Pump Boreholes water

supply schemes at Yandamo gari A, Yandamo Gari

B, Garin Yasai, Hardo Jauro, Kargo, Fulanin Lula,

Madoji Tsalle, Fulanin Barnawa Fulanin Bayan Eka

STK, Fulanin Santarbi, Dangoho, Fulanin Mai Rago (

Yamma) Buntusu Fulani, Fulanin Hardo Musa

S.Tankarkar Fulanin Kurguna, Fulanin Kaina

unguwar Yamma ( Danzomo) in Sule Tankarkar LGA

and Kwanar Tsuru, Garin Kwalandi, Garin Malam,

Gabasawar Kwalandi and Fulanin Shabarawa (

Gidan Ibrahim Bidu) in Maigatari LGA Forte Technical Services Ltd Maigatari 16,234,680.00 16,234,680.00 16,194,093.30 8/5/2019 12 weeks 100 Completed

191

Construction of 2No. New Solar Powered Water

supply Schemes at Malarin Gamm in Malam

Madori Local Government Area and Walawa in

Birniwa Local government Area Hadejia Zone BSY Industries Nig Ltd M/madori + Birniwa 12,046,650.00 12,046,650.00 12,016,533.37 31/05/2019 8 weeks 100 Completed

192

Rehabilitation of 17no. Small towns water supply

schemes at hadejia and Jahun Zone BSY Industries Nig Ltd Hadejia + Jahun 5,161,739.63 5,161,739.63 4,915,942.50 31/05/2019 8 weeks 100 Completed

193

Procurement of Assorted Submersible pumps

Across the State Umar Aliyu & Sons Nig Ltd Across the state 19,479,796.87 19,479,796.87 18,552,187.50 16/4/2019 8 Weeks 100 Completed

194

Procurement of 2No. 200KVA Perkins Generating

Set for Kazaure and Birnin Kudu Zone Limis Brothers & Co B/Kudu 28,619,712.07 28,619,712.07 28,619,712.07 16/4/2019 8 Weeks 100 Completed

195

Extension of Pipe borne water supply line (Lot-27)

phase III-2018 Constituency project at Achauya

village in S/Tankarkar . Pullad S/Tankarkar 3,647,700.00 3,647,700.00 3,647,700.00 31/12/2018 8 weeks 100 Completed

196

Constr of Solar Water Scheme at Hammadi in

Babura Constituency Mufabamax Nigeria Ltd. Babura 6,020,700.00 6,020,700.00 6,005,648.25 17/10/2018 8 weeks 100 Completed

197

Constr of 6no. Hand pumps boreholes (2018 phase

III) Constituency projects at Gidantawa, Ganzayi A,

Gidan Chaya, K/Hausa basen Asibiti, Kanzan

Masarafa and Yam Darma Element in K/Hausa

Constituency. Dantatu Nigeria Ltd. K/Hausa 4,426,380.00 4,426,380.00 4,415,314.05 18/12/2018 8 weeks 100 Completed

198

Constr of Solar water Scheme at Ando in Babura

Constituency Mufabamax Nigeria Ltd. Babura 6,020,700.00 6,020,700.00 6,005,648.25 17/10/2018 8 weeks 100 Completed

199 Constr of 45no. Hand pumps Boreholes at Babura Safah & Fresh Int. Babura 33,207,300.00 33,207,300.00 33,207,300.00 7/3/2019 16 weeks 100 Completed

Balance C/F 2,027,797,397.30 2,136,098,433.29

2v

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

Balance B/F 2,027,797,397.30 2,136,098,433.29

200

Constr of Solar water scheme at Madari in Kanya

Babba Constituency Mufabamax Nigeria Ltd. Babura 6,023,115.00 6,023,115.00 6,008,057.21 21/12/2018 8 weeks 100 Completed

201

Constr of Solar water supply scheme at Gayana

Tudu in Gagarawa L.G.A. Limis Brothers & Co Gagarawa 6,023,005.00 6,023,115.00 6,008,057.21 20/5/2019 8 weeks 100 Completed

202 Constr 2no Bore holes at Hadejia LGA Limis Brothers & Co Hadejia 1,254,519.00 1,254,519.00 1,251,382.70 28/12/2018 4 weeks 100 Completed

203

Rehab of Water Scheme at Dadda in Stankarkar

LGA Guidence Agency for Excellence S/Tankarkar 1,447,031.25 1,447,031.25 1,443,413.67 8/1/2019 4 weeks 100 Completed

204

Constr of 3no. Hand pumps water supply (Lot-14)

phase III 2018 Constituency projects at Sabuwar

Kwalta, Rugar Zargu, and Dakuna town in

M/madori Constituency. Express Innovation Co. Ltd. M/madori 2,213,340.00 2,213,340.00 2,207,806.65 14/01/2019 8 weeks 100 Completed

205

Rehab of Madoji solar water Scheme at Abanderi

in S/Tankarkar LGA Giant Tech Ltd. S/Tankarkar 1,667,531.25 1,667,531.25 1,588,125.00 3/6/2019 4 weeks 100 Completed

206

Constr of solar water Scheme at Abanderi in Dutse

LGA Limis Brothers & Co Dutse 4,598,493.32 4,598,493.32 4,379,517.45 31/12/2018 8 weeks 100 Completed

207

Co ns tr o f (38No ) Hand P umps a t Makadi'B ', Gangara

waje , jiji'B ' Unguwar Sama, Gidan Hardo Gawo , Gidan Beti

dan Maigari, bo dawa C, Unguwar Ts amiya B, GJ ASS

Baura , GGADSS Babuura , Ts adura , Babura Arewa B,

Kaute B, in babura LGA, Duts e Capita l Scho o l in Duts e ,

unguwar Lawan in J ahun, tunubu to wn in J ahun, kuka in

/S /Tankarkar, Gidan Danta Fulani, Kanawa Aume, dan

Amale Fulani, Gage Yamma, J e lawa Damu, Kauyen Fulani

HP in babura LGA, Shamuri HP in S /Tankarkar, Tinubu,

Hayin Tara Yamma in J ahun, Burukum Fulani, Gidan

Makeri, Minu, Unguwar Magaji, Ba ta li, Malamawa, Bikawa

Bata li, Muni A, Gidan Dawa and Dan Makeri G/Nagawo in

Babura LGA Bulangu Drilling Babura 28,041,729.00 28,041,729.00 28,041,720.00 9/8/2019 14 weeks 100 Completed

208

Upgrading and Co nvers io n o f 1No . Mo to rixzed water

s upply s cheme to s o la r po wered a t Maizuwo in Sule

tankarkar LGA Sims Glo ba l Res o urces S/Tankarkar 6,829,987.50 6,829,987.50 6,504,750.00 6/8/2019 4 weeks 100 Completed

209

Upgrading and Co vers io n o f 1No . Mo to rized water s upply

s cheme to s o la r po wered t Gangara in Babura LGA Sims Glo ba l Res o urces Babura 6,829,987.50 6,829,987.50 6,504,750.00 6/8/2019 4 weeks 100 Completed

210

Rehabilitation of 6no water scheme in Hadejia,

Gimel and Jahun, Zones Limis Brothers & Co State 5,047,035.00 5,047,035.00 5,047,035.00 23/11/2018 6 weeks 100 Completed

211

Rehab of 3no water schemes in Gumel and Jahun

zones Limis Brothers & Co Gumel+Jahun 4,089,750.00 4,089,750.00 4,089,750.00 20/08/2019 6 weeks 100 Completed

212

Rehab of 4no water schemes in Ringim and

Hadejia zones Sims Global Ringim + Hadejia 7,543,200.00 7,543,200.00 7,543,200.00 20/02/2019 6 weeks 100 Completed

213

Rehab of 6no water schemes in Auyo, K/kasamma

& hadejia Sims Global

Auyo +

K/kasamma

+Hadejia 7,660,800.00 7,660,800.00 7,660,800.00 20/8/2019 6 weeks 100 Completed

214

Rehab of 10no water schemes in Hadejia,

M/madori, Kaugama, Birniwa, Guri & Auyo Sims Global State 7,660,800.00 7,660,800.00 7,660,800.00 20/8/2019 6 weeks 100 Completed

215

Rehab of 10no water schemes in Ringim and

Gumel zones Sims Global Ringim + Gumel 7,541,100.00 7,541,100.00 7,541,100.00 20/8/2019 6 weeks 100 Completed

Balance C/F 2,132,268,821.12 2,240,569,967.11

2w

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

Balance B/F 2,132,268,821.12 2,240,569,967.11

216

Rehab of 9no water schemes in Ringim, Kazaure

and Dutse zones Sims Global State 6,413,400.00 6,413,400.00 6,413,400.00 20/8/2019 6 weeks 100 Completed

217

Constr of 1no Solar water supply schemes at

Achau in Jahun LGA Loyalty Properties Ltd. Jahun 6,023,325.00 6,023,325.00 6,023,325.00 15/01/2019 8 weeks 100 Completed

218

Maintenance of Generators in Gumel from Dec,

2017 to Dec, 2018 Marbs Eng. Ltd. Gumel 2,607,937.50 2,607,937.50 2,607,937.50 20/12/2017 24 months 100 Completed

219

Maintenance of 2no. Generators in Babura town

from Dec, 2017 to Dec, 2018 Marbs Eng. Ltd. Babura 582,750.00 582,750.00 582,750.00 1/12/2017 24 months 100 Completed

220

Maintenance of 4no.Generators in Ringim town

from Dec, 2017 to Dec, 2018 Marbs Eng. Ltd. Ringim 2,945,908.25 2,945,908.25 2,945,908.25 3/11/2018 24 months 100 Completed

221

Maintenance of 3no.Generators in Ringim town

from Dec, 2016 to Dec, 2017 Marbs Eng. Ltd. Ringim 2,802,187.50 2,802,187.50 2,802,187.50 21/12/2016 24 months 100 Completed

222

Maintenance of Generators inBabura town from

Dec, 2017 to Dec, 2018 Prestige Integ. Services Babura 582,750.00 582,750.00 582,750.00 1/12/2017 12 months 100 Completed

223

Constr of 22no Hand pumps in K/kasamma

constituency (phase III 2018) Lot-13 Dabino Internation Ltd. K/kasamma 16,230,060.00 16,230,060.00 16,230,060.00 31/12/2018 12 weeks 100 Completed

224

Constr of Solar Powered Water Supply Schemes

Constituency Project ( 2019 Phase 1) Lot-42 at

Kilawa in Fagam Contituency. Jignaj Global Contr Ltd Gwaram 6,023,220.00 6,023,220.00 6,023,220.00 11/12/2019 8 weeks 100 Completed

225

Upgradingand Conversation of 1no. Motorised

water Supply Scheme (2019 phase1 ) Constituency

Project Lot-22 at Zauma in Gwiwa Constituency. Jignaj Global Contr Ltd Gwiwa 8,685,075.00 8,685,075.00 8,685,075.00 11/12/2019 8 weeks 100 Completed

226

Upgradingand Conversation of 1no. Motorised

water Supply Scheme (2019 phase1 ) Constituency

Project Lot-23 at Korayalin Gwiwa Constituency. Jignaj Global Contr Ltd Gwiwa 6,863,325.00 6,863,325.00 6,863,325.00 11/12/2019 8 weeks 100 Completed

227

Renov of 2no. Solar Powered water Supply

schemes Contituency project ( 2019 Phase 1) Lot-

24 at Gidan Kudege and Kurneji in Gwiwa

Constituency Jignaj Global Contr Ltd Gwiwa 3,227,700.00 3,227,700.00 3,227,700.00 11/12/2019 8 weeks 100 Completed

228

Constr of Solar Powered water Supply schemes

Contituency project ( 2019 Phase 1) Lot- 41 at

tsallakawa in Fagam Constituency, Gwaram Local

Government Area Jignaj Global Contr Ltd Gwaram 6,023,220.00 6,023,220.00 6,023,220.00 11/12/2019 8 weeks 100 Completed

Balance C/F 2,201,279,679.37 2,309,580,825.36

2x

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

Balance B/F 2,201,279,679.37 2,309,580,825.36

229

Upgrading and Conversion of Zaburan, Small Town

Motorised Water Supply Scheme to Solar Powered

in Kaugama Local Government Area. Sims Global Resources Nig Ltd Kaugama 16,917,862.50 16,917,862.50 16,112,775.00 6/8/2019 8 weeks 100 Completed

230

Construction of hand pump boreholes water

supply schemes constituency projects (2019 first

quarter) Lot-4 at wuro bagga, gamawari, yola

zairare, fulanin takaje, sabon gidan gabas, fulanin

kufayi, hijabau, adamante, rugar abdul kogi,

masharmo, makwasharga, waryam B, lautayi,

Yambo, Jalingo G/kwalli, kawarin gari, yadda,

gidan yauto (Z/kanya), gumurwa G.A Idi, Rimin

kasuwa and shamakeri B/hanya in Bulangu

constituency Bulangu drilling serveices LtdK/Hausa 15,491,227.50 15,491,227.50 15,491,227.50 11/12/2019 12 Weeks 100 Completed

TOTAL 2,233,688,769.37 2,341,989,915.36

2y

Ministry of Works

P OST C ON T R A C T P R OJEC T EVA LUA T ION

S/ N . P R OJEC T EXEC UT OR LOC A T ION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. ST A T US R EM A R KS

AMOUNT CONTRACT SUM (N) C ER T IF IED WOR K D A T E P ER IOD IN %

1 Constr. of Internal Road Netw ork and Drainage at College of Agriculture YamidiAmirco Univ ersal Concept Hadejia 114,852,386.25 499,296,564.31 499,296,564.31 6/10/2011 20 w eeks 100 Completed

2 Reconstr. Of Asphaltic concrete ov erlay of Kijaw al-Dabi road (4.5km) Triacta Nig. Ltd. Ringim 453,412,679.27 526,840,847.35 526,837,028.02 18/3/2013 3 months 100 Completed

3 Urban Tow ns Streetlight Projects at Karkarna Tow n Stratrade Nig. LTD Yankw ashi 234,338,917.73 234,338,917.73 230,270,845.40 11/11/2013 6 Months 100 Completed

4

Commissioning as Consultant for the Superv ision of the Constr. of Gumel-

G/Gambo, feeder roads, M/madori-Dakido, Shafar-G/sani OPIQ Consultant LTD. Gumel 16,024,856.75 16,024,856.75 16,024,856.75 3/3/2014 6month 100 Completed

5 Constr. of feeder road at gumel-Garin Gambo in Gumel L.G.A. Omega Stars Nig. Ltd. Gumel 149,763,131.44 149,763,131.44 149,763,131.44 13/02/2014 6 months 100 Completed

6 Consulltancy serv ices for the Constr. Of Kiy ako-Zarenaw a feeder road UKM Civ il Eng. Consultant B/kudu 16,187,482.45 16,187,482.45 16,187,482.00 2/2/2014 8 months 100 Completed

7

Commissioning as consultant for the superv ision of Kazaure tow nship roads

(15KM) Wuro Associate Kazaure 92,141,988.97 92,141,988.97 85,842,229.66 5/9/2013 8 months 100 Completed

8

Commissioning as Consultant for the Constr. of Sule Tankarkar Tow nship

roads Thamar Eng. Ltd. S/tankarkar 64,638,503.00 64,638,503.00 58,339,028.04 13/02/2014 12 months 100 Completed

9 Re-Constr. of Sule Tankarkar Tow nship road (5.16km) Afdin Constr. Co. Ltd. S/tankarkar 727,649,360.56 909,561,700.70 857,941,087.50 4/4/2016 8 months 100 Completed

10 Cons. of Handpumps Across the State (RUWASA) Muhabib Nig. Ltd State 28,000,000.00 28,000,000.00 26,000,013.06 3/1/2014 4month 100 Completed

11

Supervision of the construction of Maigatari-Galadi-Girbobo-

Diginsa-Birniwa Road (Phase II) (37.1KM) HIMMA TECH SERV. Birniwa 74,761,966.60 74,761,966.60 74,760,523.27 18/05/2017 13 months 100 Completed

12

Supply and installation s of 150 Units Integrated stand alone Solar

Powered Streetlight at Aujara in Jahun Local Govt Area Sims Nig. Ltd. Jahun 95,192,680.94 95,192,680.94 90,659,703.75 14/12/2017 12 weeks 100 Completed

13

Constr of Dutse-Madobi-Katanga-Dangoli with Spur from Madobi to

Baranda road (35.7km) Lot -1 Gerawa Global Eng Ltd. Dutse 4,643,482,872.42 4,643,482,872.42 4,640,482,872.21 27/4/2018 12 months 100 Completed

14

Rehab/Asphalt Overlay of Babura-Yarkirya-Kuzunzumi road

(49.4km) lot -5 Gerawa Global Eng Ltd. Babura 4,944,415,159.06 4,944,415,159.06 4,941,128,617.95 27/4/2018 8 months 100 Completed

15

Constr of Access road from Harbo Sabuwa to Harbo Tsohuwa

(1.52km) lot-9 Retercha Co. Ltd. Jahun 241,058,058.35 241,058,058.35 240,921,302.79 27/4/2018 4 months 100 Completed

16

Constr of Bariki-Munzarau-Tawakkalta-Turabu road (16.8km) lot-

6 CGC Nig. Ltd. Hadejia 2,919,955,823.72 2,919,955,823.72 2,919,634,562.05 4/5/2018 12 months 100 Completed

17

Electrification project at Katurje in Kafin Hausa Constituency, Kafin

Hausa LGA. Kawu Nig. Ltd. K/Hausa 10,916,014.48 10,916,014.48 10,023,514.47 10/5/2018 16 weeks 100 Completed

18

Commissioning as Consultant for the Supervision of the Constr. of

Babura township roads (10.28km) UKM Civil Eng. Babura 45,933,233.82 45,933,233.82 45,933,237.82 7/6/2018 10 months 100 Completed

19

Commissioning as Consultant for the Supervision of the

Rehab./Asphalt Concrete Overlay of Babura-Yarkirya -Kuzunzumi

road (49.4km) HAG Eng Consultants Babura 86,527,265.28 86,527,265.28 86,212,265.27 7/6/2018 8 months 100 Completed

20

Supply and Installations of Integrated Standalone Solar Powered

Streetlight at Yalleman Town in Kaugama LGA SIMS Nig. Ltd. Kaugama 85,276,275.00 85,276,275.00 82,792,500.00 25/9/2018 3 months 100 Completed

21 Constr of Gadadin-Jigawar Sarki road (600m) in Dutse LGA. Retercha Company Ltd Dutse 64,554,624.07 64,554,624.07 64,554,624.07 20/12/2018 3 months 100 Completed

22 Constr. Of Kaugama-Mallam Madori Feeder Road (19.31km) Lot-15 IGEE Eng. Ltd. M/madori 520,687,101.38 520,687,101.38 520,082,820.60 21/12/2018 6 months 100 Completed

23

Construction of Hammado-Danfarantama-mele-Balkarya-Kokinami-

Limanmado-Barikin faka-Gumel Feeder Road (33.0KM) Lot 17. Babandoki Gen. Enterp. Gumel 911,985,078.38 911,985,078.38 911,971,052.16 21/12/2018 6 months 100 Completed

Balance C/F 16,541,755,459.92 17,181,540,146.20

3a

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOC A T ION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 16,541,755,459.92 17,181,540,146.20

24

Construction of Kazaure - Gallu Babba - Karkarna Feeder Road

(16.0KM) Lot 13. China Zhanghao Nig. Ltd.Kazaure/Yankwashi 527,255,190.00 527,255,190.00 527,223,814.03 27/12/2018 6 months 100 Completed

25

Construction of Kanya Babba - Kankare - Ballada - Duzau - Dan

Halili - Kyambo - Mundu - Goran Maje Feeder Road (19.KM) Lot 18. A.Y.A. Logistics & Constrt Ltd. Babura 512,115,693.47 512,115,693.47 511,568,526.00 24/12/2018 6 months 100 Completed

26 Construction of Kanya Babba Township Road (2.0KM) Lot 10. Mother Cat Nig. Ltd. Babura 346,070,232.61 346,070,232.61 343,974,392.46 24/12/2018 6 months 100 Completed

27

Rehabilitation of Hadejia - Aguyaka - Gudincin Road (4.30KM) Lot

13. Centralead Nig. Ltd. Hadejia 972,823,696.47 972,823,696.47 923,431,810.86 24/12/2018 8 months 100 Completed

28 Electrification Project at Masanawa in Kiyawa L.G.A. Nabakwai Gen. Enterprises Kiyawa 19,149,196.14 19,149,196.14 18,810,572.61 24/12/2018 12 weeks 100 Completed

29 Electrification Project at Hambarawa in Ringim L.G.A. Al-Majeed Constr. Nig. Ltd Ringim 14,261,545.68 14,261,545.68 14,236,065.78 24/12/2018 12 weeks 100 Completed

30 Electrification Project at Gidan Garke in Ringim L.G.A. Al-Majeed Constr. Nig. Ltd Ringim 13,314,314.45 13,314,314.45 13,290,203.07 24/12/2018 12 weeks 100 Completed

31 Electrification Project at Guntai in Gwiwa L.G.A. H & N Engr. Consultancy Gwiwa 38,057,153.66 38,057,153.66 38,055,053.50 24/12/2018 16 weeks 100 Completed

32

Maintenance of Failed Section of Auyo - Kafin hausa Road (100)

Section 'B' Retercha Company Ltd Auyo 51,175,143.02 51,175,143.02 51,083,760.00 31/12/2018 12 weeks 100 Completed

33 Electrification Project at Kanya Babba - Muna in Babura L.G.A. Deetech Nig. Ltd. Babura 29,981,471.52 29,981,471.52 27,374,387.04 24/12/2018 16 weeks 100 Completed

34

Maintenance of Failed Section of Auyo - Kafin hausa Road (150)

Section 'A' Retercha Company Ltd K/hausa 69,533,544.12 69,533,544.12 69,392,935.50 31/12/2018 12 weeks 100 Completed

35 Electrification Project at NTA Hadejia in Hadejia L.G.A. Xtra X-99 Integ. Services Hadejia 19,427,729.87 19,427,729.87 19,419,923.62 31/12/2018 12 weeks 100 Completed

36 Electrification Pro ject at Sambo Primary School Hadejia in Hadejia L.G.A. A+Techn. Integ. Services Hadejia 14,876,542.55 14,876,542.55 14,087,057.64 31/12/2018 12 weeks 100 Completed

37Construction of B lock Line Drainages (738M ) at Basirka Town in Gwaram

L.G.A. Pullad Global Consultant Gwaram 22,726,861.79 22,726,861.79 22,726,861.79 24/12/2018 12 weeks 100 Completed

38Supply and Installations of 130 Units Integrated Standalone Solar Powered

Streelight at Danzomo in Sule Tankarkar L.G.A Sims Nigeria Limited S/Tankarkar 82,515,030.00 82,515,030.00 74,843,565.00 1/17/2018 16 weeks 100 Completed

39Supply and ins tla tio n o f s tanda lo ne s o la r po wer s tree tlight a t Bekarya , mele

and Danmano mi to wns in Gumel LGA Sims glo ba l res . Nig ltd Gumel 91,008,225.00 91,008,225.00 88,200,000.00 22/11/2018 16 weeks 100 Completed

40 Co ns tr o f ro ad Netwo rk a t Co llege o f Educa tio n, Gumel (3.3km) lo t-4 H & M Nig. Ltd. Gumel 674,198,072.42 674,198,072.42 672,895,458.69 30/4/2018 6 mo nths 100 Completed

41 Co ns tr o f Gadadin-J igawar Sarki ro ad, Duts e (600m) Retercha Co . Ltd Duts e 64,554,624.07 64,554,624.07 64,146,465.81 20/12/2018 3 mo nths 100 Completed

42

Supply and Installations of Integrated Standalone Solar Powered Streetlight

at Hammado-Gagarawa (200 Unit) Bosuwa (100 Unit) iri (100 Units) M anga-

Takwasa (120 Unit) and Unguwar Gawo-Batali-Kuzunzumi-Balarabe (200 unit)

Total 720 Units (Lot 2) SIM S NIGERIA LTD Gagarawa 430,360,875.00 430,360,876.00 430,349,174.12 12/2/2019 14 Weeks 100 Completed

43Construction of block line drain and Filling of Low Area in M ajia Community

o f Taura LGA Ummukhulsum Invest Taura 86,485,008.42 86,485,008.42 86,470,998.89 20/06/2019 6 month 100 Completed

44

Supply and Installation of inytegrated standalone Solar Powered Streetlight

at buji (150 Units), Basirka/Digijin (120 Units), Kudai (100 Units), balanngu-

Sarawa (100 Units) Garin Gabas (160 Units) and Birniwa Tasha (100 units)

Total 710 units (Lot-1) Arrayan Ventures Global State 403,649,600.00 403,649,600.00 392,133,000.00 16/4/2019 14 weeks 100 Completed

45Commissioning as Consultant for the Supervision of the Construction of

Kazaure-Fanda-Sabaru-Gallu-Karkarna Feeder Road (16km) UKM Civil Engineering

Yankwashi

+Kazaure 9,226,965.83 9,226,965.83 9,226,965.82 20/3/2019 6 weeks 100 Completed

Balance C/F 21,034,522,176.01 21,674,306,863.29

3b

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOC A T ION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 21,034,522,176.01 21,674,306,863.29

46

Commissioning as consultant for the Supervision of the Supply and

Installation of Intergrated Standalone Solar Powered Streetlights at Buji 150

units, Basirka/Digijin 120 Units, Kudai 100 Units, Bulangu-Sarawa 100 units,

garin Gabbas 160 units and birniwa Tasha 100 Units (to tal 710 Units) ARDUGAL Engineering Ltd State 7,606,368.00 7,606,368.00 6,606,368.00 26/3/2019 4 months 100 Completed

47

Commissioning as Consultant for the Supervision of the Supply and

Installation of Integrated Standalone Solar Powered Streetlights at

Hammado-M aituruniya-Duhuwa-Gangar 200 Units, Bosuwa 100 units, Kiri 100

units, M anga-Takwasa 12 units and unguwar Gawo-Bataki-Kuzunzumi-

Balarabe 200 units (Total 720 units) Secwave Nigeria Limited State 7,531,315.31 7,531,315.31 7,531,315.31 26/3/2019 4 months 100 Completed

48

Commissioning as consultant for the supervision of the construction of

sada-Kanawa-Dankari-Nasarawa-Kuda Feeder Road (11.2km) UKM Engineering Consult Yankwashi 6,889,699.73 6,889,699.73 6,337,767.06 10/4/2019 6 M onths 100 Completed

49

Rehabilitation of ITC line from Kwanar Gawo to Hago in Kafin Hausa Local

Government Area Tasiu M uhammad Invest Ltd K/Hausa 8,333,050.69 8,333,050.69 8,333,050.56 10/7/2019 8 weeks 100 Completed

50

Re-Construction of the damaged sections of Abunabo-Kadira-Guri Road

(Phase-III o f Eastern Bye Pass) CGC Nig Ltd Guri 50,000,000.00 50,000,000.00 7,936,238.63 15/07/2019 10 weeks 100 Completed

51

Rehabilitation of Karshi-Gagarawar Karshi ITC Line and Extension of Farin

Gida TDN in Ringim Local Government Area, Rehabilitation of Yandutse-

M alamawar Yandutse ITC in Ringim LGA Almajeed Constr Ltd Ringim 11,391,654.86 11,391,654.86 11,391,654.01 30/07/2019 10 weeks 100 Completed

52 Supply & Installation of Solar streetlight at Emir's Drive, Dutse Arrayyan Global Vent Dutse 17,319,500.00 17,319,500.00 16,563,750.00 31/7/2019 8 weeks 100 Completed

53

Supply & Installation of Stand alone so lar powered streetlight at Government

Girls Arabic Secondary School Babura, Government Girls Unity Secondary

School Gwaram & Computer Girls Secondary School Roni. Sims Global Res State 60,780,300.00 60,780,300.00 60,767,338.01 31/7/2019 12 weeks 100 Completed

54

Supply and Ins ta lla tio ns o f Integra ted S tanda lo ne So lar P o wered Stree tlights

a t GGASS Sule Tankarkar, GGSSS Taura and Mo del Bo arding P rimary

Scho o l, Gumel SIMS Nigeria Limited State 75,380,550.00 75,380,550.00 73,185,000.00 11/9/2019 12 weeks 100 Completed

55 Supervis io n o f Gumel to wns hip ro ads Himma Tech. Services Gumel 17,440,289.13 17,440,289.13 17,044,289.12 20/3/2019 8 weeks 100 Completed

56 Supervis io n o f J igawar Dan Ali to wns hip ro ads Akram Eng. Babura 7,484,294.27 7,484,294.27 7,484,294.26 20/3/2019 6 mo nths 100 Completed

57 Co ns t o f Gumel to wns hip ro ads (4.73km) Triac ta Nig. Ltd. Gumel 996,587,950.46 996,587,950.46 996,577,850.89 24/12/2018 8 mo nths 100 Completed

58

Supply and Installations of Integrated stadalone Solar Powered

Streetlight at GGASS Birniwa, GGASS Kaugama, Science of Deef

Hadejia and JSSS Guri SIMS Global Resources Across the state 77,002,800.00 77,002,800.00 77,002,800.00 15/10/2019 12 weeks 100 Completed

59 Eletrification project of Gwarzon-Garki Alsabur Global Nig Garki 63,635,819.61 63,635,819.61 62,733,544.82 2/10/2019 12 weeks 100 Completed

TOTAL 22,441,905,768.07 23,081,690,455.35

Ministry of Education

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT COMPL. STATUS REMARKS

AMOUNT CONTRACT SUM (N) C ER T IF IED WOR K DATE PERIOD IN %

1 Constr. of 1no. Block of w orkshop w ith Standard w ork benchs at GSTC Ringim Marb Eng. & Multi-serv ices Ringim 18,564,893.17 18,564,893.17 18,564,893.17 30/12/2016 6 w eeks 100 Completed

2 Constr. of 1no. Block of tw o (2) Science Laboratories at GSTC Ringim Marb Eng. & Multi-serv ices Ringim 28,487,680.00 28,487,680.00 28,487,680.00 30/12/2016 6 w eeks 100 Completed

3

Construction of Block of 2No. Classroom Islamiya (1No.) 3rd Phase 2017

Constituency Projects (Lot-16) at Lautai in Garki Constituency. Jag & H Integ. Serv. Ltd. Garki 3,273,426.45 3,273,426.45 3,115,926.45 6/3/2018 6 weeks 100 Completed

4

Construction of Block of 2No. Classroom Islamiya (3No.) 3rd Phase 2017

Constituency Projects (Lot-7) at Yalwa and Gandum Bundigoma in Malam

madori Constituency. Ramadan Constr. Ltd. M/madori 9,180,832.35 9,180,832.35 8,708,332.34 6/3/2018 9 weeks 100 Completed

5

Construction of 1No. Block of 2No. Classroom Islamiya School (1No.) 2nd

Phase 2017 Constituency Projects (Lot-11) at Gora maikasuwa in Roni

Constituency. Na'ayi Resources Nig. Ltd. Roni 3,272,810.10 3,272,810.10 3,115,310.10 19/3/2018 3 weeks 100 Completed

6

Construction of 1no. Block of 2No. Classroom Islamiya School (1No.) 2nd

Phase 2017 Constituency Projects (Lot-16) at GAJSS Jeke Gari in Sule

Tankarkar Constituency. Khairussabah Nig. Ltd. S/Tankarkar 3,224,219.90 3,224,219.90 3,078,219.90 6/3/2018 6 weeks 100 Completed

7

Construction of 1no. Block of 6No. Classroom Islamiya School (Upstairs

1No.) 2nd Phase 2017 Constituency Projects (Lot-9) at Tsakuwawa in Miga

Constituency. A.G.A. Kilawa Nig. Ltd. Miga 20,735,725.17 20,735,725.17 20,079,272.01 6/3/2018 18 weeks 100 Completed

8

Constr of 1-block of 3 classrooms and 1no. Block of 6-seater toilets at GDSS

Amaryawa, Roni LGA (1st phase 2018 projects) (Lot-8) Sabon Garin Yaya Roni 11,734,589.64 11,734,589.64 11649994.83 12/7/2018 6 months 100 Completed

9

Constr of 1-block of 3 classrooms and 1no. Block of 6-seater toilets at GDSS

Yankwashi (1st phase 2018 projects) (Lot-9) Sabon Garin Yaya Yankwashi 11,734,589.64 11,734,589.64 11,649,994.83 12/7/2018 6 months 100 Completed

10

Constr of 1-block of 3 classrooms and 1no. Block of 6-seater toilets at GDSS

Sakwaya in Dutse LGA. (Lot-10) Steb by Step Integ. Dutse 11,734,589.64 11,734,589.64 11,618,430.78 16/7/2018 6 months 100 Completed

11

Constr of 1-block of 3 classrooms and 1no. Block of 6-seater toilets at GDSS

Kwalam in Taura LGA. (Lot-12) Steb by Step Integ. Taura 11,734,589.64 11,734,589.64 11,598,398.71 16/7/2018 6 months 100 Completed

12

Constr of 1-block of 3 classrooms and 1no. Block of 6-seater toilets at GDSS

Garki (1st phase 2018 projects) Lot-6 Yusma Tech Invest. Garki 11,745,517.16 11,745,517.16 11,660,425.90 12/7/2018 6 months 100 Completed

13

Constr of 1-block of 3 classrooms, 1no. Admin. Block at GDSS Doko, GDSS

Gunka and GDSS Shuwarin (Lot-13) SUB Gen. Ventures State 70,030,373.82 70,030,373.82 69,711,120.60 16/7/2018 6 months 100 Completed

14

Constr of 1-block of 3 classrooms each at at GDSSTsohuwar Gwaram,

Birniwa, Maigatari, Guri and Auyo LGA (1st phase 2018 projects) (Lot-14) Sabon Garin Yaya State 46,968,477.85 46,968,477.85 45,989,109.54 12/7/2018 6 months 100 Completed

15

Constr of 1-block of 3 classrooms and 2no. Block of 6-seater toilets at GDSS

Beguwa, Ringim LGA (1st phase 2018 projects) (Lot-15) Imam Ahmed Nig. Ltd. Ringim 14,089,454.89 14,089,454.89 13,899,800.51 12/7/2018 6 months 100 Completed

16

Constr of 1-block of 3 classrooms and 2no. Block of 6-seater toilets at GDSS

Gerawa, Ringim LGA (1st phase 2018 projects) (Lot-16) Imam Ahmed Nig. Ltd. Ringim 14,133,338.07 14,133,338.07 13,888,831.16 12/7/2018 6 months 100 Completed

17

Constr of 1-block of 3 classrooms and 2no. Block of 6-seater toilets at GDSS

Babaldu in Birnin Kudu LGA (Lot-17) Math Global Ltd. B/Kudu 14,099,561.50 14,099,561.50 13,428,153.82 16/7/2018 6 months 100 Completed

BAL. C/F 304,744,668.99 304,744,668.99

4a

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 304,744,668.99 304,744,668.99

18

Constr of 1-block of 3 classrooms and 2no. Block of 6-seater toilets at GDSS

Takanebu, Miga LGA (1st phase 2018 projects) (Lot-18) Sabon Garin Yaya Miga 14,089,454.89 14,089,454.89 13,936,878.82 12/7/2018 6 months 100 Completed

19

Constr of 1-block of 3 classrooms and 2no. Block of 6-seater toilets at GDSS

Kwarko in Gwaram LGA (Lot-19) SUB Gen. Ventures Gwaram 14,080,760.93 14,080,760.93 13,859,245.31 16/7/2018 6 months 100 Completed

20

Renov of classrooms blocks, Hostels, Admin block, School Clinic, Toilet, and

Constr of wall fence and Gate, Additional 3 courses blocks to Existing wall,

Renov of Zonal office and Reticulation of Water at GDSS Kazaure (1st phase

2018 projects) (Lot-27) Abdulcom Projects Kazaure 49,732,107.32 49,732,107.32 49,223,609.70 12/7/2018 6 months 100 Completed

21

Development and Improvement on the Grave of the Late Emir of Hadejia,

Mallam Muhammadu Sambo at Mairakumi Village of Malam Madori LGA. AGM & Sons Nig. M/Madori 14,426,123.10 14,426,123.10 13,734,855.30 19/7/2018 9 weeks 100 Completed

22

Renov of ICT and Science Laboratories at 4no. Centre of Excellence across

the state (Dutse Model Internation School, GUSS Fantai, GUSS Ringim and

SSS Lautai). Abdulcom Projects Ringim 32,979,423.69 32,979,423.69 32,001,226.78 21/9/2018 10 weeks 100 Completed

23

Constr. Of 2no. Bore-hole and Pipeline route of Water Supply from

Matanfada pump station to (GSS) Roni in Roni. NE Global Eng. Roni 12,400,890.80 16,875,276.80 16,867,411.57 14/9/2017 8 Weeks 100 Completed

24

Construction for the Rehabilitation of Windstorm Damaged Structuresat

Science School Lautai in Gumel L.G.A. (phase I) Gerawa Global Engr. Ltd. Gumel 94,507,858.91 94,507,858.91 93,884,336.41 16/10/2018 16 weeks 100 Completed

25

Construction of Block of 2-Classroom Islamiyya (2NO.) Lot-6 at Tashena

and Tagwaro in Malam madori Constituency Express Innovation Nig. M/Madori 6,208,148.10 6,208,148.10 5,998,152.30 1/11/2018 6 Weeks 100 Completed

26

Construction of Block of 2-Classroom Islamiyya (5NO.) Lot-18 at

Samamiya, Zanga, Waza, Warwade and Rungumawa in Birnin kudu

Constituency. Nushe Business Resources B/Kudu 15,574,595.66 15,574,595.66 15,051,170.66 1/11/2018 16 Weeks 100 Completed

27

Construction of Block of 2-Classroom Islamiyya (1NO.) Lot-12 at Unguwar

mani in Roni Constituency. Yanduna Ventures Ltd. Roni 3,100,220.00 3,100,220.00 2,995,220.45 1/11/2018 4 Weeks 100 Completed

28

Construction of Block of 2-Classroom Islamiyya (4NO.) Lot-17 at Guru,

Wawan rafi, Lokon Rijiya and Hayen Gabas in Kazaure Constituency. Yanduna Ventures Ltd. Kazaure 12,427,116.32 12,427,116.32 12,005,316.33 1/11/2018 15 Weeks 100 Completed

29

Construction of Block of 2-Classroom Islamiyya (2NO.) Lot-15 at Karkarna

Town and Magami Fulani in Yankwashi Constituency. Granitoids Engr. Service Ltd. Yankwashi 6,230,701.36 6,230,701.36 6,011,944.91 1/11/2018 6 weeks 100 Completed

30

Construction of (3N0.) Blocks of 2-classroom Islamiyya school typed 2018

phase II constituency projects (Lot -9) at chilaro, munkawo and kakori

sabuwa in Birniwa constituency. Amm Manzo Nig. Ltd Birniwa 9,334,202.22 9,334,202.22 9,019,202.22 23/11/2018 8 weeks 100 Completed

31

Construction of (2N0.) Blocks of 2-classroom Islamiyya school typed 2018

phase II constituency projects (Lot -15) at Tagwayen fage and Kargo in

Garki constituency. MMZ Garki contr. Nig Ltd Garki 6,230,718.16 6,230,718.16 6,020,881.65 23/11/2018 8 weeks 100 Completed

32

Construction of (8N0.) Blocks of 2-classroom Islamiyya school typed 2018

phase II constituency projects (Lot -4) at Dangan tsaure, Galadanchi,

maranjuwa, kargo mahauta, abaya cikin gari mainomi opp. Government

House, Gwdige and sabuwar Abuja in Dutse constituency. Backbone global links Dutse 24,921,192.62 24,921,192.62 23,735,124.26 23/11/2018 18 weeks 100 Completed

33

Construction of (8N0.) Blocks of 2-classroom Islamiyya school typed 2018

phase II constituency projects (Lot -3) at hago, Inkaibo, Hardo Ali, Mezan,

kirin Kwatalo, sabon sara and kurunbudi in Bulangu constituency. Kawu Nig Ltd K/Hausa 21,772,100.00 21,772,100.00 21,712,598.35 23/11/2018 16 weeks 100 Completed

34

Construction of (3N0.) Blocks of 2-classroom Islamiyya school typed 2018

phase II constituency projects (Lot -5) at Sabuwar Gwaram, Unguwar Kudu

Jibwis kila and unguwar Gamji in Gwaram constituency. Nushe Bus. Resou. Nig Ltd Gwaram 9,346,064.24 9,346,064.24 8,947,064.23 23/11/2018 10 weeks 100 Completed

BAL. C/F 652,106,347.31 656,580,733.31

4b

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 652,106,347.31 656,580,733.31

35

Construction of (1N0.) Blocks of 2-classroom Islamiyya school typed 2018

phase II constituency projects (Lot -21) at Bila in Taura constituency. Nushe Bus. Resou. Nig Ltd Taura 3,113,183.85 3,113,183.85 3,008,183.85 23/11/2018 8 weeks 100 Completed

36

Construction of (6N0.) Blocks of 2-classroom Islamiyya school typed 2018

phase II constituency projects (Lot -22) at Gidan Gona Ringim,

Karshi,Shangal, Jankawa Yola, and Gasakoli in Ringim constituency. Marb Eng. Multi-serv. Nig. Ltd Ringim 18,662,710.50 18,662,710.50 18,029,888.10 23/11/2018 18 weeks 100 Completed

37

Construction of (6N0.) Blocks of 2-classroom Islamiyya school typed 2018

phase II constituency projects (Lot -24) at Tsadoji, Filin Danshawai, Gidan

shallau, Lokon Dallatu, Gada yamma and Ganguli islamiyya in Kazaure

constituency. Yanduna Venture Nig Ltd Kazaure 18,629,958.00 18,629,958.00 17,999,963.10 23/11/2018 18 weeks 100 Completed

38

Construction of (1N0.) Blocks of 2-classroom Islamiyya school typed 2018

phase II constituency projects (Lot -6) at Kwatsatsa in Roni constituency. Na'ayi Resources Ltd Roni 3,115,354.00 3,115,354.00 3,006,399.90 23/11/2018 10 weeks 100 Completed

39

Construction of (2N0.) Blocks of 2-classroom Islamiyya sschool typed

2018 phase II constituency projects (Lot -19) at Karkarna in Yankwasi

constituency. Granitoids Eng. Nig. Ltd Yankwashi 6,224,045.10 6,224,045.10 6,020,298.10 5/12/2018 8 weeks 100 Completed

40

Construction of (5N0.) Blocks of 2-classroom Islamiyya school atDakwaro,

3No. 2-classroom block at govt. day arabic secondary school basirka and

1No.2-classroom block at digijin (Lot-8) in fagam constituency in gwaram

LGA G.M Sara & sons Nig Ltd Gwaram 15,485,650.64 15,485,650.64 14,960,646.75 1/11/2018 4 weeks 100 Completed

41

Construction of (3N0.) Blocks of 2-classroom Islamiyya sschool typed

2018 phase II constituency projects (Lot -13) at chukutu, malumawar

taura and gidan ganji in Taura constituency. Nushe Bus. Resou. Nig Ltd Taura 9,347,337.24 9,347,337.24 9,032,337.24 1/11/2018 10 weeks 100 Completed

42

Construction of (4 No.) Blocks of 2-Classroom Islamiyya School Typed

2018 Phase III Constituency Projects (Lot-15) at Kwaido, Tsagam,

Almajirawa and Majiyawa in Ringim Constituency. Marb Engr. Multi-Services Ringim 12,454,716.33 12,454,716.33 12,034,716.33 18/12/2018 12 weeks 100 Completed

43

Construction of (3 No.) Blocks of 2-Classroom Islamiyya School Typed

2018 Phase II Constituency Projects (Lot-8) at Majirga Yanduna, Jamaga and

Ganuwa in Miga Constituency. Nabakwai Gen. Enterp. Nig. Ltd. Miga 9,334,202.22 9,334,202.22 9,027,175.50 5/12/2018 8 weeks 100 Completed

44

Construction of (2 No.) Blocks of 2-Classroom Islamiyya School Typed

2018 Phase III Constituency Projects (Lot-11A) at Malori and Kuka Dabo in

Kirikasamma Constituency. Tosarawa Global Nig. Ltd. Kirikasamma 6,231,558.16 6,231,558.16 6,021,558.16 18/12/2018 10 weeks 100 Completed

45

Construction of (1 No.) Blocks of 2-Classroom Islamiyya School Typed

2018 Phase II Constituency Projects (Lot-23) at Kawari in Kiyawa

Constituency. Demastbo Ventures Ltd. Kiyawa 3,104,993.80 3,104,993.80 2,999,099.25 17/12/2018 8 weeks 100 Completed

46

Construction of (9 No.) Blocks of 2-Classroom Islamiyya School Typed

2018 Phase II Constituency Projects (Lot-25) at Masaya, Zaraina, Tsangaya,

Badingu, Dokoki, Ramin kura, Samamiya, Zarainawa and Kura in Birnin

kudu Constituency. Nushe Business Resources B/kudu 27,909,116.39 27,909,116.39 26,964,115.92 5/12/2018 20 weeks 100 Completed

47

Construction of (2 No.) Blocks of 2-Classroom Islamiyya School Typed

2018 Phase II Constituency Projects (Lot-II) at Diya and Unguwar Malawa

in Gwiwa Constituency. Dankaka Intgrated Services Gwiwa 6,225,216.00 6,225,216.00 6,015,219.00 5/12/2018 8 weeks 100 Completed

48

Construction of (2 No.) Blocks of 2-Classroom Islamiyya School Typed

2018 Phase II Constituency Projects (Lot-18) at Maitsamiya and

Burmanwa in Sule Tankarkar Constituency. Pullad Global Consultant S/tankarkar 6,223,218.34 6,223,218.34 6,014,218.35 5/12/2018 8 weeks 100 Completed

BAL. C/F 798,167,607.88 802,641,993.88

4c

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 798,167,607.88 802,641,993.88

49

Construction of (1 No.) Blocks of 3-Classroom, 1No. 6-Seater Pit Latrine,

and Supply of 17No. 3-Seater Desks at GDASS G/Gabas, 1No. Block of 3-

Classroom, 1No. 6-Seater Pit Latrine, and 23No. 3-Seater Desks at GDASS

Bulangu. Masaka Global Concept Ltd. Various 24,539,884.16 24,539,884.16 24,430,607.74 12/12/2018 8 weeks 100 Completed

50

Construction of (2 No.) Blocks of 2-Classroom Islamiyya School Typed

2018 Phase II Constituency Projects (Lot-2) at Majingini and Babban

Kambari in Gumel Constituency. Jag & H Intgrated Services Ltd. Gumel 6,230,703.46 6,230,703.46 6,020,716.06 5/12/2018 8 weeks 100 Completed

51

Construction of (1 No.) Blocks of 3-Classroom, 1No. 6-Seater Pit Latrine,

Supply of (38No.) 3-Seater Desks at GDASS Aujara, 1No. Block of 3-

Classroom, Construction 1No. 6-Seater Pit Latrine, Supply of 34No. 3-Seater

Desks at GDASS Kwalam, Construction of (1No.) Block of 6-Seater Pit

Latrine Renovation of 2-Classroom and Supply of (29No.) 3-Seater Desks at

GDASS Gwaram, Construction of (1No.) Block of 3-Classroom, 1No. 6-Seater

Pit Latrine and Supply of (38No.) 3-Seater Desks at GDASS Marma. Yusmatech Investment Nig. Ltd Across the state 45,687,338.25 45,687,338.25 43,815,809.25 12/12/2018 8 weeks 100 Completed

52

Construction of (1 No.) Blocks of Students Hostel and Supply and

Distribution of 100No, Double Bunks Beds at GSTC Birnin kudu. Math Global Investment Ltd. B/kudu 29,140,079.84 29,140,079.84 29,092,645.67 12/12/2018 8 weeks 100 Completed

53

Construction of (1 No.) Blocks of Students Hostel and Supply and

Distribution of 100No, Double Bunks Beds at GSSS Kanya Babba, Babura

LGA. Sabon Garin 'Yaya Nig. Ltd. Babura 29,140,079.84 29,140,079.84 29,092,645.63 12/12/2018 8 weeks 100 Completed

54

Construction of Teacher Lodge Hostel 2018 Phase II Constituency

Projects (Lot-26) at Madachi in Kirikasamma Constituency. K-Manu Gen. Constr & Engr. Kirikasamma 22,461,011.45 22,461,011.45 21,391,439.17 5/12/2018 16 weeks 100 Completed

55

Construction of (4 No.) Blocks of 2-Classroom Islamiyya School Typed and

2-Classroom Blocks with Head Master Office Subeb Typed (2No) 2018

Phase II Constituency Projects (Lot-14) at Dawar Gada, Malam Aba,

Gangara and Dan Barno in Maigatari Constituency. ALLAH Abin Dogara Nig. Ltd. Maigatari 18,855,242.08 18,855,242.08 18,291,543.71 5/12/2018 14 weeks 100 Completed

56

Construction of (3 No.) Blocks of 2-Classroom Islamiyya School Typed

2018 Phase III Constituency Projects (Lot-4) at Kwaita, Unguwar Dinya and

Computer Girls School Roni in Roni Constituency. Yanduna Ventures Ltd. Roni 23,016,302.00 23,016,302.00 22,149,857.43 18/10/18 10 weeks 100 Completed

57

Construction of (1No.) Blocks of Teacher Lodge 2018 Phase III

Constituency Projects (Lot-8B) at Buji in Buji Constituency. Yayarin Tukur Nig. Ltd. Buji 12,701,000.00 12,701,000.00 12,688,611.14 18/10/2018 12 weeks 100 Completed

58

Construction of (1 No.) Blocks of 3-Classroom, and 1No. 6-Seater Pit Latrine

each at GDSS Jahun, GDASS Malam madori, GDASS Gagarayaga, GDASS

Kondiko, GDASS Roni and GDASS Danmasara Babandoki General Enterprises Across the state 71,225,652.48 71,225,652.48 71,216,726.88 12/12/2018 8 weeks 100 Completed

59

Construction of (3 No.) Blocks of 2-Classroom Islamiyya School Typed

2018 Phase III Constituency Projects (Lot-20) at Galadimawa Maje ward,

Tunannan Kiyawa ward and Zakwaro Tsirma in Kiyawa Constituency. Step by Step Intergrated Serv Kiyawa 9,346,077.24 9,346,077.24 9,026,037.24 24/12/2018 10 weeks 100 Completed

60

Construction of (4 No.) Blocks of 2-Classroom Islamiyya School Typed

2018 Phase III Constituency Projects (Lot-18) at Dantanoma, Abuja, Garin

Barka and Gangara Village in gumel Constituency. Jag & H Integrated Serv. Ltd. Gumel 12,454,716.33 12,454,716.33 12,034,716.33 18/12/2018 12 weeks 100 Completed

BAL. C/F 1,102,965,695.01 1,107,440,081.01

4d

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 1,102,965,695.01 1,107,440,081.01

61

Construction of (5 No.) Blocks of 2-Classroom Islamiyya School Typed

2018 Phase III Constituency Projects (Lot-8A) at Gantsa kudu, Foto,

Gwadayi, Sagu and Y/Chakari in Buji Constituency. Mai-mai Blocks Industry Nig. Buji 15,578,895.41 15,578,895.41 14,935,576.16 18/12/2018 12 weeks 100 Completed

62

Construction of (8 No.) Blocks of 2-Classroom Islamiyya School Typed

2018 Phase III Constituency Projects (Lot-4) at Sumangara, Tsahiro, Kafit

Gwaram, Innakawa, Tsangaya Sara, Sara kudu, Isawa Maruta and Tsangayar

kofar kudu in gwaram Constituency. Nushe Business Resources Gwaram 24,909,432.66 24,909,432.66 24,069,432.66 18/12/2018 15 weeks 100 Completed

63

Construction of (2 No.) Blocks of 2-Classroom Islamiyya School Typed

2018 Phase III Constituency Projects (Lot-17) at Kari Tsalle and Majiya

Tasha in Taura Constituency. Nushe Business Resources Taura 9,662,035.24 9,662,035.24 9,470,443.73 18/12/2018 10 weeks 100 Completed

64

Construction of (8No.) Blocks of 2-Classroom Islamiyya School Typed

2018 Phase III Constituency Projects (Lot-21) at Dangoli, Yarma,

Andazawa, Rungumawa, Zarainawa A., Chandan, Nahuce and Bammowa in

Birnin kudu Constituency. NUshe Business Resources B/kudu 24,922,872.66 24,922,872.66 24,090,432.66 18/12/2018 15 weeks 100 Completed

65

Construction of (1No.) Blocks of 2-Classroom Islamiyya School Typed

2018 Phase III Constituency Projects (Lot-6) at Malam Isa Unguwa in

Kaugama Constituency. Mai-mai Blocks Industry Nig. Kaugama 3,113,679.08 3,113,679.08 3,010,779.08 18/12/2018 10 weeks 100 Completed

66

Construction of (2No.) Blocks of 2-Classroom Islamiyya School Typed

2018 Phase III Constituency Projects (Lot-1A) at Arawa and Tigima in

Auyo Constituency. Mai-mai Blocks Industry Nig. Auyo 6,231,558.16 6,231,558.16 6,021,558.16 18/12/2018 10 weeks 100 Completed

67

Construction of (1No.) Blocks of 2-Classroom Islamiyya School Typed

2018 Phase III Constituency Projects (Lot-9) at Waluwa in Kafin Hausa

Constituency. Mai-mai Blocks Industry Nig. K/Hausa 3,117,879.08 3,117,879.08 3,010,779.08 18/12/2018 8 weeks 100 Completed

68

Construction of (4 No.) Blocks of 2-Classroom Islamiyya School Typed

2018 Phase III Constituency Projects (Lot-22) at Kilawa, Martaba, Sumiyau

and Galambi in Fagam Constituency. Pullad Global Consultant Gwaram 14,367,439.93 14,367,439.93 13,711,431.33 18/12/2018 10 weeks 100 Completed

69

Construction of (2 No.) Blocks of 2-Classroom Islamiyya School Typed

2018 Phase III Constituency Projects (Lot-11C) at Diladige and Malorin

Baturiya in Kirikasamma Constituency. Nabakwai Gen. Enterprises Kirikasamma 6,230,718.16 6,230,718.16 6,020,718.16 10/12/2018 8 weeks 100 Completed

70

Construction of (1 No.) Blocks of 2-Classroom Islamiyya School Typed

2018 Phase III Constituency Projects (Lot-11B) at Madachi in Kirikasamma

Constituency. Mai-mai Blocks Industry Nig. Kirikasamma 3,115,354.08 3,115,354.08 3,010,779.08 18/12/2018 8 weeks 100 Completed

71

Construction of (1No.) Blocks of 2-Classroom Islamiyya School Typed 2018

Phase III Constituency Projects (Lot-14) at Yoruba Islamiyya School Hadejia

Quarters in Hadejia Constituency. Step by Step Interg. Serv Hadejia 3,115,779.08 3,115,779.08 3,010,779.08 18/12/2018 8 weeks 100 Completed

72

Construction of (4No.) 1-Blocks of 3-Classroom Islamiyya School Typed

2018 Phase III Constituency Projects (Lot-23) at Karkarna 'A', Karkarna 'B',

Karkarna 'C' and Karkarna 'D' in Yankwashi Constituency. Granitoids Engr. Services Yankwashi 34,364,888.00 34,364,888.00 32,923,529.10 18/12/2018 18 weeks 100 Completed

73

Construction of 1-Blocks of 3-Classroom, 1-Block of 6-Seater VIP Pit Latrine

and Hand Pump at Tsohuwar Gwaram (Lot-2). Babandoki Gen. Enterp. Gwaram 12,528,665.77 12,528,665.77 12,289,355.25 28/12/2018 3 months 100 Completed

74

Construction of (3No.) Blocks of 2-Classroom Islamiyya School Typed 2018

Phase III Constituency Projects (Lot-16) at Dan Abzin, Tinkishi and Waila

Karai in Gwiwa Constituency. Jignaj Global Constr. Ltd. Gwiwa 9,341,037.24 9,341,037.24 9,026,037.24 18/12/2018 10 weeks 100 Completed

75

Construction of 1-Blocks of 3-Classroom, 1-Block of 6-Seater VIP Pit Latrine

and Hand Pump at GDSS Kirikasamma (Lot-3). Babandoki Gen. Enterp. Kirikasamma 12,467,040.04 12,467,040.04 12,112,508.77 28/12/2018 3 months 100 Completed

BAL. C/F 1,286,032,969.60 1,290,507,355.60

4e

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 1,286,032,969.60 1,290,507,355.60

76

Renovation of 2No. Students Hostel, Block of 3-Classes and Computer

Laboratory at GSTC Birnin kudu (Lot-9). Masaka Global Concept B/kudu 14,023,833.17 14,023,833.17 13,375,079.21 28/12/2018 3 months 100 Completed

77 Renovation of Classrooms and Hostels at GSS Aujara (Lot-5). Ngaloma Constr. Co. Jahun 79,506,892.39 79,506,892.39 78,002,265.33 28/12/2018 6 months 100 Completed

78

Development of Permanent Site of GGDSS Gagarayaga and GDSS Gawuna

(Lot-4). Ngaloma Constr. Co. Gwaram+Hadejia 95,540,000.00 95,540,000.00 93,407,896.69 28/12/2018 6 months 100 Completed

79

Construction of Additional Block of 3-Classrooms each at GDSS Kanti

Kazaure and GDSS Bosuwa (Lot-3) Pullad Global Consultant Kazaure+Gagarawa 19,004,045.22 19,004,045.22 18,695,950.58 28/12/2018 3 months 100 Completed

80

Supply and Installation of (63 Units) of Solar Powered System at Various

Schools (Lot-2) Sims Nig. Ltd. Across the state 48,238,101.45 48,238,101.45 47,471,547.50 1/11/2018 3 Month 100 Completed

81

Procurement and Renovation of Classes at Jigawa State Academy for the

Gifted, Bamaina (Lot-8) Ngaloma Constr. Co. B/Kudu 47,319,728.73 47,319,728.73 45,688,101.46 28/12/2018 3 months 100 Completed

82

Procurement of Science Laboratory equipment and consumables at

Dutse Model Int. school (Lot-7) Al-hamsad Invest. Ltd. Dutse 4,587,837.70 4,587,837.70 4,587,837.70 28/12/2018 4 month 100 Completed

83

Procurement and Distribution of 2.520 3-Seater Students Desks to various

Senior Secondary Schools across the State (Lot-6) Furni-Elect Global Ventures Across the state 50,373,237.60 50,373,237.60 50,373,237.60 28/12/2018 5 months 100 Completed

84

Supply and Distribution of 640No. 3-Seater Students Desks and Benchs at

GDSS Jahun, GGDSS Malam madori, GDSS Gagarayaga, GDSS Kondiko, GGDSS

Roni and GDSS Danmasara Furni-Elect Global Ventures Across the state 12,796,800.00 12,796,800.00 12,796,800.00 12/12/2018 8 weeks 100 Completed

85

Procurment of 224 boxer motorcycles for school supervision effectiveness

across the state. Babandoki Gen. Entp. Across the state 75,000,000.00 75,000,000.00 75,000,000.00 28/12/2018 8 weeks 100 Completed

86 General Renov of School Structures at GGASS Kaugama (Lot-4) Al-hamsad Invest. Ltd. Kaugama 153,516,678.32 153,516,678.32 153,278,954.44 28/12/2018 8 months 100 Completed

87

Procurement of ICT materials/Equipments for 3-centres of excellence (Lot-

6) Al-hamsad Invest. Ltd. Across the state 41,452,175.00 41,452,175.00 41,452,175.00 28/12/2018 3 months 100 Completed

88 Procurement of School uniforms, Sendels and Bags to Nomadic Schools. Muhib Global State 29,880,000.00 29,880,000.00 29,880,000.00 19/12/18 12 weeks 100 Completed

89

Procurement of instructional materials to Schools at basic levels across

the state. Babandoki Gen. Entp. State 62,319,731.25 62,319,731.25 62,319,731.25 28/12/18 12 weeks 100 Completed

90

Constr of Upstars Classroom Islamiyya type (1no.) Block of 2classrooms

(2018 phase II) constituency project (Lot-17) at Harazimiyya in Hadejia

Alh. Umaru Babandoki Nig.

Ltd. Hadejia 15,011,567.54 15,011,567.54 14,889,338.36 5/12/2018 14 weeks 100 Completed

91P rinting o f 2019 Bas ic Educa tio n certifica te examina tio n (BECE) ques tio n papers with

ans wer s hee ts fo r J SS Acro s s the S ta te Clear Impres s io ns Ltd State 15,260,680.05 15,260,680.05 15,260,680.05 13/6/2019 8 weeks 100 Completed

92 Re-co ns truc tio n o f fa llen wall fence a t GGUSS Garki and GUSS M/Mado ri P ullad Glo ba l Co ns ult State 9,039,035.07 9,039,035.07 8,908,113.11 10/7/22019 8 weeks 100 Completed

93

Reno vatio n o f S to rm damages a t 7no . Scho o ls acro s s the s ta te : GGASS

S/Tankarkar, GUSS maiga ta ri, GDSS Shagari Qtrs . Hadejia , GSS Aujara , GDSS Buji,

GGDSS Birnin Kudu and Duts e Mo del Int Scho o l. AGM & So ns Nig State 23,498,908.59 23,498,908.59 23,490,970.35 15/8/2019 8 weeks 100 Completed

94

Reno vatio n o f s to rm damages a t GDASS Dantano ma in Gumel LGA, Scho o l o f

Arabic and Is lamic S tudies (SAIS) Hadejia , GDASS Zainab Kazaure , GDASS Dabi in

Ringim, GDASS Gwaram and GGASS Danzo mo in Gagarawa LGA P ullad Glo ba l Co ns ult State 53,582,692.89 53,582,692.89 53,299,656.22 16/8/2019 16 weeks 100 Completed

95Supply and Ins ta lla tio n o f 52No . S tanda lo ne So lar Integra ted S tree tlight (P has e-II) a t

the J igawa Sta te Co llege o f Is lamic & Legal S tudies Ringim Sims Glo ba l Res o urces Ringim 32,215,050.00 32,215,050.00 3/5/2019 4 weeks

96Supply and Distribution of Science text Books and Teachers Guide for Senior

Secondary Schools Across the State Learn Africa Plc State 49,949,800.00 49,949,800.00 49,949,800.00 11/7/2019 6 weeeks 100 Completed

97Procurement and Sewing of 30,000 sets of School Uniforms to Senir Secondary

Schools acros the state 313 Textile Nig Ltd. State 79,980,000.00 79,980,000.00 79,980,000.00 3/9/2019 12 weeks 100 Completed

98 Renov of Dining Hall at GGASS Babura Sabon garin Yaya Ltd. Babura 20,866,366.64 20,866,366.64 20,859,565.28 28/12/2018 8 weeks 100 Completed

BAL. C/F 2,318,996,131.21 2,323,470,517.21

4f

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 2,318,996,131.21 2,323,470,517.21

99

Constr of 3no. Blocks of 2classroom Islamiyya School type (2018 phase III)

constituency project (Lot 19) at Fulanin Kurfi, Kuka kofar gari, Kantudu in Yanduna Ventures Kazaure 9,346,077.24 9,346,077.24 9,346,077.24 18/12/2018 12 weeks 100 Completed

100

Constr of additional 3classrooms block each at GDSS Ringim Areawa, GDSS

Baura (Lot-1) Pullad Global Consult Ringim + Babura 19,004,045.22 19,004,045.22 17,305,017.20 28/12/2018 3 months 100 Completed

101

Constr of 1no. Block of 3-classrooms each at GDSS Babura, GDSS

Galagamma Gumel, GDSS babaldu and GDSS Ringim Areawa (2019 Capital

projects) Babandoki Gen Entp. state 44,808,022.00 44,808,022.00 44,225,690.58 3/10/2019 12 weeks 100 Completed

102

Renov of Science and ICT Labs. at 9no. Proposed Science Centres of

Excellence core 2 (GGUSS M/madori, GDSS G/Gabas, GGSS Garki, GDSS

Gwiwa, GUSS Aujara, GUSS Maigatari, GDSS T/Gwaram, GC Birnin Kudu and

GUSS Basirka) AGM & Sons Nig Ltd. state 24,140,000.00 24,140,000.00 24,034,905.66 25/09/2019 12 weeks 100 Completed

103

Constr of 1no. Block of 3-classrooms each at 8no. GDSS across the state

(2019 Capital Projects) Math Global Invest. Ltd. Across the state 90,089,432.00 90,089,432.00 87,675,689.47 28/10/2019 12 weeks 100 Completed

104

Construction of 1No Block of 3 classrooms each at GDASS Kiri Kasamma

GDASS Bulangu GDASS Miga GDASS Kiri Kasamma GDASS Bulangu GDASS

Miga, GDASS Marma, GDASS Limawa , GDASS Birniwa and GDASS Aujara A.A. Maikatako Gen Entr Aujara 78,414,000.00 78,414,000.00 74,680,037.57 14/11/2019 20 weeks 100 Completed

105

Procurment of Medical Drugs, ICT and Sicbay Equipment for Jigawa

Academy for the Gifted, Bamaina IMAM Ahmed Nig Ltd. B/kudu 4,639,345.25 4,639,345.25 4,639,345.25 16/10/2019 2 weeks 100 Completed

106

Construction of Additional Block of 3-Classrooms each at GDSS Galagamma

Gumel and GGDSS Hadejia (Lot-2) Pullad Global Consultant Gumel + Hadejia 19,004,045.22 19,004,045.22 18,695,950.58 28/12/2018 3 months 100 Completed

107

Construction of (4No.) Blocks of 2-Classroom Islamiyya School Typed 2018

Phase II Constituency Projects (Lot-12) at Batali, Insharuwa, Bakar Kuka

and Masko in Babura Constituency. Mufabamex Concept Nig. Ltd. Babura 12,444,222.00 12,444,222.00 12,024,222.00 5/12/2018 12 weeks 100 Completed

108

Procurement of 7.500No Furniture Sets to Primary Schools 4-6 Pupil (1st &

2nd Quarter 2018 UBEC/SUBEB Intervention Project) Lot-32 across the

State. Furni-Elect Global Ventures Across the state 119,749,935.00 119,749,935.00 119,749,935.00 18/12/2018 16 weeks 100 Completed

TOTAL 2,740,635,255.14 2,745,109,641.14

4g

Ministry of Land

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT (N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

1

Construction of 1No. Block of 4No. House of 2No. Bedroom

Semi-Detach at Kazaure Local Government Area Al-Sabur Global Links Kazaure 10,779,821.20 10,779,821.20 10,289,698.65 19/3/2019 14 Weeks 100 Completed

2

Construction of 1No Block of 4No House of 2No Bedroom Semi-

Detach (Lot-6) at Hadejia Local government Area Ngaloma Construction Hadejia 10,719,537.18 10,719,537.18 10,673,330.85 19/3/2019 14 Weeks 100 Completed

3

Construction of 1No Block of 4No House of 2No Bedroom Semi-

Detach (Lot-9) at Malam Madori Local government Area Ngaloma Construction M/Madori 10,719,854.25 10,719,854.25 10,673,330.85 19/3/2019 14 Weeks 100 Completed

4

Constr of 1no. Block of 4no. House of 2no. Bedrooms semi detached

(Lot-3) at Birniw a LGA MWT Real Estate & Gen Entp. Birniw a 10,424,245.65 10,424,245.65 10,420,295.55 19/3/2019 14 Weeks 100 Completed

5

Constr of 1no. Block of 4no. House of 2no. Bedrooms semi detached at

Jahun LGA Nushe Business Jahun 10,691,491.65 10,691,491.65 10,606,901.55 19/3/2019 14 Weeks 100 Completed

TOTAL 53,334,949.93 53,334,949.93

Ministry of Commerce

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT AMOUNT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

1 Renov of 4no. Structures at EPZ Maigatari AMIA Int. Ltd. Maigatari 12,738,100.79 12,758,100.79 12,738,095.56 28/10/2019 2 months 100 Completed

Total 12,738,100.79 12,758,100.79

Dutse Capital Development Athority

P OST C ON T R A C T P R OJEC T EVA LUA T ION

S/ N P R OJEC T EXEC UT OR LOC A T ION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. ST A T US R EM A R KS

AMOUNT CONTRACT SUM (N) C ER T IF IED WOR K D A T E P ER IOD IN %

1 Constr. of New High Brow lay out in Dutse Dantata & Saw oe Dutse 3,822,690,275.89 5,073,417,718.02 4,577,814,987.09 14/10/2011 48 w eeks 83 Completed

2

Prov ision & Installation of Streetlights at the 3 Arms zone, Ibrahim Aliy u

Eastern By e-pass and Old Police Hqrs. To Gadadin-Fanisau Link road,

Dutse. Dantata & Saw oe Dutse 1,064,545,077.91 1,267,613,083.02 1,058,862,394.59 8/11/2012 12 w eeks 100 Completed

3

Consultant for the Constr. Of 30N0. Houses for Jigaw a State members of

the House of Assembly at Disina HAG Eng. Nig. Limited Dutse 131,922,214.60 147,301,384.74 147,146,095.43 11/7/2012 14 months 100 Completed

4 Cconstr of Wall Fence & land Scaping to 30no. Houses Afdin Constr. Ltd. Dutse 315,291,242.77 315,291,242.77 291,248,714.33 7/5/2015 6 months 100 Completed

TOTAL 5,334,448,811.17 6,803,623,428.55

Cabinet Office

POST CONTRACT PROJECT EVALUATION

S/ N P R OJEC T EXEC UT OR LOC A T ION C ON T R A C T R EVISED VA LUE OF C OM M EN C EM EN TC OM P L. ST A T US R EM A R KS

A M OUN T (N ) C ON T R A C T SUM (N ) C ER T IF IED WOR K D A T E P ER IOD IN %

1

Constr. of Juma'at Prayer Mosque at Galambi, fagam

Constituency in Gwaram LGA. Ramadan Constr. Nig. Ltd. Gwaram 26,396,975.14 26,396,975.14 25,831,669.29 24/01/2017 16 weeks 100 Completed

2

Constr. of five (5) Daily prayer Mosques at Gidan Mutari

Fulanin Harbo, Danmodi Gari and Hammado in Sule

Tankarkar Constituency. Manhaf Global Ventures S/Tankarkar 6,543,114.75 6,543,114.75 6,352,538.59 16/10/2017 6 weeks 100 Completed

3

Constr. of Friday prayer mosque at Gada yamma and 3no.

Daily prayer mosques at Gada Rumawa, Sabaru Fanda and

Gada Gabas in Kazaure Constituency. Yanduna Ventures Kazaure 53,061,271.36 53,061,271.36 52,346,684.20 25/10/2017 12 Weeks 100 Completed

4

Interlocking Tiles and External Works of (1No.) Friday Prayer M osque (

2018 Phase II) Constituency Pro jects (Lot-44) at Garki Central

M osque in Garki Constituency M M Z Garki Construction Garki 7,642,374.33 7,642,374.33 7,280,614.74 31/12/2018 8 weeks 100 Completed

5

Constr. of Friday Prayer Mosques at Nasarawa in Gumel

Constituency. JAG & H Integrated Serv. Ltd. Gumel 15,046,340.35 15,046,340.35 15,001,060.45 16/10/2017 12 weeks 100 Completed

6

Construction of Five (5) daily Prayer Mosques at Wutsadaand

Kankare Fulani in Gagarawa Constituency. Al-Nasibi Gen. Intp. Gagarawa 4,129,061.98 4,129,061.98 3,932,439.98 18/12/2017 4 Weeks 100 Completed

7

Constr of (3no.) Five Daily prayer mosques (2018 phase III)

Constituency projects (Lot-11) at Wasari, Yanusori and Goyi

in Bulangu Constituency Kawu Nig Ltd. K/Hausa 5,868,833.55 5,868,833.55 5,780,776.24 23/11/2018 12 Weeks 100 Completed

8

Construction of Five (5) daily Prayer Mosques at Garbagar

Gari (Garbagai Ward), Wareri (Guri Ward), Zoriyo (Adiyani

Ward), Jauron Kadira (Kadira Ward) and Dolewa (Kadira

Ward) in Guri Constituency. Alh Umar Baban Doki Nig Ltd Guri 10,322,654.95 10,322,654.95 10,322,654.94 18/12/2017 8 Weeks 100 Completed

9

Construction of Five (5) daily Prayer Mosques at mazazzaga

(Garko Ward) and Balago Town Balago Ward) in Kiyawa

Constituency. Demastbo Ventures Ltd. Kiyawa 4,129,061.98 4,129,061.98 3,932,439.98 18/12/2017 6 Weeks 100 Completed

10

Construction of (3No. Friday Prayer Mosques (2018 Phase II)

Constituency Projects ( Lot-40) at Zangin Kanya, Waloyi

Sabuwa and Tsangaiwa in Bulangu Constituency Kawu Nigeria Ltd Kafin Hausa 16,888,035.21 16,888,035.21 16,797,853.54 23/11/2018 12 Weeks 100 Completed

11

Completion/renovation of Juma'at Prayer Mosques at Jibwis

Garki in Garki Constituency. Jag & H Intgrt Services Ltd Garki 23,736,083.26 23,736,083.26 23,423,788.50 18/12/2017 12 Weeks 100 Completed

12

Construction of (3No) Five Daily Prayer Mosques at Kukuma

Kudu (Kumuma Ward), Dakori (Gantsa Ward) and Falgeri

Arewa ( Falgeri Ward) in Buji Constituency A+-TECH INTEG Buji 6,193,592.97 6,193,592.97 5,898,659.98 1/19/2018 8 weeks 100 Completed

13

Constr of 2no. Five daily prayer mosques 2017 constituency

projects phase III remaining works (lot-3) at Mahudi

Tsangaya and Jingino in Fagam Constituency, Gwaram LGA. G.M. Sara & Sons Ltd. Gwaram 4,129,061.98 4,129,061.98 3,932,439.98 16/4/2018 6 weeks 100 Completed

Balance C/F 184,086,461.81 184,086,461.81

8a

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN TC OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

Balance B/F 184,086,461.81 184,086,461.81

14

Constr of Juma'at Prayer mosques 2017 constituency projects

phase III remaining works (Lot-7) at Kiri-kasamma Gari in

Kirikasamma Constituency. Alh Umaru Babandoki K/Kasamma 17,176,291.17 17,176,291.17 17,130,145.55 16/4/2018 12 weeks 100 Completed

15

Constr /Renovation/Completion of prayer mosques 2017

Constituency projects phase III Remaining works (Lot-4) at

Galambi Central mosque in Fagam Constituency, Gwaram LGA. Ramadan Constr Ltd. Gwaram 16,011,630.21 16,011,630.21 15,249,171.63 16/4/2018 12 weeks 100 Completed

16

Renovation/Completion of Juma'at prayer mosques 2017

Constituency projects phase III Remaining works (Lot-8) at

Maje in Taura Constituency. Nushe Business Resources Taura 9,001,562.13 11,793,398.14 10,940,373.12 16/4/2018 12 weeks 100 Completed

17

Constr of (6no.) five Daily Prayer Mosques 2018 Constituency

Projects (Lot-5) at Nera, Lauya, Shantake, Kurtulla, Haladawa

and G/Ganji in Kanya Babba Constituency, Babura LGA. Deetech Nig. Ltd. Babura 11,455,254.00 11,455,254.00 10,784,277.06 10/10/2018 6 weeks 100 Completed

18

Constr of (2no.) five Daily Prayer Mosques 2018 Constituency

Projects (Lot-15) at Gadewa and Bayan Lambu in Jahun

Constituency. Yanduna Ventures Jahun 3,788,985.90 3,788,985.90 3,746,645.70 10/10/2018 6 weeks 100 Completed

19

Constr of (5no.) five Daily Prayer Mosques 2018 Constituency

Projects (Lot-22) at Bodayal, Belas, K/chiroma, Todariya and

Tsedau in Kazaure Constituency. Yanduna Ventures Kazaure 9,745,359.75 9,745,359.75 9,269,646.75 10/10/2018 6 weeks 100 Completed

20

Constr of (1no.) five Daily Prayer Mosques 2018 Constituency

Projects (Lot-2) at Mata kuwa in Auyo Constituency. Step by Step Integ. Auyo 1,952,627.20 1,952,627.20 1,870,570.63 10/10/2018 6 weeks 100 Completed

21

Constr of (1no.) five Daily Prayer Mosques 2018 Constituency

Projects (Lot-28) at Bula Sure in Roni Constituency. Na'ayi Resources Ltd. Roni 1,943,923.00 1,943,923.00 1,853,929.35 10/10/2018 6 weeks 100 Completed

22

Constr of (5no.) five Daily Prayer Mosques 2018 Constituency

Projects (Lot-6) at Bulunkuce, Kangire, Kantoga T., Gorrawa

and Tosoro in B/kudu Constituency. Nushe Bus. Resources B/kudu 9,559,735.50 9,559,735.50 9,139,735.50 10/10/2018 6 weeks 100 Completed

23

Constr of (5no.) five Daily Prayer Mosques 2018 Constituency

Projects (Lot-7) at Dukana, U/Galadima, Shungurun, Iggi and

Gogoriya in Birnin Kudu Constituency. Nushe Bus. Resources B/Kudu 9,795,123.50 9,795,123.50 9,375,123.50 10/10/2018 6 weeks 100 Completed

24

Constr of (4no.) five Daily Prayer Mosques 2018 Constituency

Projects (Lot-24) at Talaku, Janiskifeta, Janiskitagwaro and

Kashin Dila in Malam Madori Constituency. Express Innovation Concept M/Madori 7,732,082.04 7,732,082.04 7,363,887.63 10/10/2018 6 weeks 100 Completed

25

Constr of (3no.) five Daily Prayer Mosques 2018 Constituency

Projects (Lot-19) at Nasarawa, Dubantu and Walawa Matsaro

in Hadejia Constituency. Alh. Umaru Babandoki Hadejia 5,735,858.70 5,735,858.70 10/10/2018 6 weeks On-going

Balance C/F 287,984,894.91 290,776,730.92

8b

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN TC OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

Balance B/F 287,984,894.91 290,776,730.92

26

Constr of (3no.) five Daily Prayer Mosques 2018 Constituency

Projects (Lot-23B) at G/Hadau, D/Talle and D/Takore in

Maigatari Constituency. Modang Investment Ltd. Maigatari 5,756,502.15 5,756,502.15 5,754,438.69 10/10/2018 6 weeks 100 Completed

27

Construction of (1NO.) five Daily Prayer Mosques 2018

Constituency Projects at Laya in Fagam Constituency,

Gwaram Local Government Area. Ramadan Constrt. Nig. Ltd. Gwaram 7,307,084.41 7,307,084.41 6,959,128.00 14/11/2018 8 weeks 100 Completed

28

Construction of (3NO.) five Daily Prayer Mosques (2018 Phase

II) Constituency Projects (Lot-12) at Gonga Yamma, Kakibare

and Jingi Town in Dutse Constituency. Al-Kassam Jannah Nig. Ltd. Dutse 5,881,500.02 5,881,500.02 5,846,768.55 23/11/2018 8 weeks 100 Completed

29

Construction of (3NO.) five Daily Prayer Mosques 2018

Constituency Projects (Lot-8) at Tsangayar Kuka, Dagaceri

Kukawa and Goguwa Kandawa in Birniwa Constituency. Amm Manzo Nig. Ltd. Birniwa 5,830,306.65 5,830,306.65 5,578,306.65 14/11/2018 8 weeks 100 Completed

30

Construction of (1NO.) five Daily Prayer Mosques 2018

Constituency Projects (Lot-1) at Kajilmaran in Auyo

Constituency. Amm Manzo Nig. Ltd. Auyo 1,943,435.55 1,943,435.55 1,859,435.55 14/11/2018 8 weeks 100 Completed

31

Construction of Five (5) daily Prayer Mosques at Sabuawar

Kaura, Kiyako, Birnin kudu, Samamiya and Bigidan in Birnin

Kudu Constituency. Nushe Business Resources B/kudu 10,322,654.95 10,322,654.95 9,831,099.96 18/12/2017 8 Weeks 100 Completed

32

Construction of Juma'at Prayer Mosques at Garin Mado in

Gagarawa Constituency. Modang Investment Ltd. Gagarawa 9,527,340.25 9,527,340.25 6,914,922.90 18/12/2017 12 Weeks 100 Completed

33

Construction of (3NO.) five Daily Prayer Mosques 2018

Constituency Projects (Lot-31) at Rauda L/Dutse, Karkarna

"A" and new Achilafiya in Yankwashi Constituency. Granitoids Engr. Service Ltd. Yankwashi 5,834,168.55 5,834,168.55 5,582,168.55 14/11/2018 8 weeks 100 Completed

34

Construction of (4NO.) five Daily Prayer Mosques 2018

Constituency Projects (Lot-10) at Basirka Taya, Basirka

S/Fawa, Ruwa Kari and Basirka Karofi in Fagam Constituency,

Gwaram Local Government Area. Ramadan Constrt. Nig. Ltd. Gwaram 7,754,111.40 7,754,111.40 7,418,111.40 14/11/2018 8 weeks 100 Completed

35

Completion/Renovation of (1NO.) five Daily Prayer Mosques

2018 Constituency Projects (Lot-4) at Faru M/Taya in Babura

Constituency. Danfatu & Sons Nig. Ltd. Babura 1,931,522.85 1,931,522.85 1,815,157.71 26/12/2018 8 weeks 100 Completed

36

Construction of (1NO.) five Daily Prayer Mosques 2018

Constituency Projects (Lot-3) at Gandun Kadir in Auyo

Constituency. Wajedu Nig. Ltd. Auyo 1,951,976.50 1,951,976.50 1,867,976.50 14/11/2018 8 weeks 100 Completed

Balance C/F 352,025,498.19 354,817,334.20

8c

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN TC OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

Balance B/F 352,025,498.19 354,817,334.20

37

Construction of (2NO.) five Daily Prayer Mosques 2018

Constituency Projects (Lot-21) at Maragwado and Jama'ar

Jiyan in Kirikasamma Constituency. Naila Multiservices Venture K/kasamma 3,922,645.70 3,922,645.70 3,910,445.70 14/11/2018 8 weeks 100 Completed

38

Construction of (3NO.) five Daily Prayer Mosques 2018

Constituency Projects at Kaugama S/Gari, Taura Jarkasa and

Daurawa in Taura Constituency. Nushe Business Resources Taura 5,853,062.00 5,853,062.00 5,632,568.55 14/11/2018 6 weeks 100 Completed

39

Completion/Renovation of (1NO.) Friday Prayer Mosque 2018

Constituency Projects at Gusau Quarters in Gumel

Constituency. Jag&H Integrated Services Ltd Gumel 4,875,157.22 4,875,157.22 4,643,096.85 14/11/2018 8 weeks 100 Completed

40

Completion/Renovation of (1NO.) Friday Prayer Mosque 2018

Constituency Projects (Lot-40) at Mele in Gumel

Constituency. Jag&H Integrated Services Ltd Gumel 11,823,386.40 11,823,386.40 11,658,501.75 14/11/2018 8 weeks 100 Completed

41

Completion/Renovation of (2NO.) Friday Prayer Mosque

(2018 Phase II) Constituency Projects (Lot-41) at Dantawuya

and Maja B/Jeji Towns in Dutse Constituency. Al-kasam Jannah Nig. Ltd. Dutse 20,177,486.34 20,177,486.34 20,221,586.34 23/11/2018 8 weeks 100 Completed

42

Completion/Renovation of (1NO.) Friday Prayer Mosque 2018

Constituency Projects (Lot-66) at Tsangaiwa in Miga

Constituency. Amia Integ. Service Nig Ltd. Miga 11,869,289.26 11,869,289.26 11,845,989.25 14/11/2018 8 weeks 100 Completed

43

Construction of Five (5) daily Prayer Mosques at mazazzaga

(Garko Ward) and Balago Town Balago Ward) in Kiyawa

Constituency. Demastbo Ventures Ltd. Kiyawa 4,129,061.98 4,129,061.98 3,932,439.98 18/12/2017 6 Weeks 100 Completed

44

Construction of Five (5) daily Prayer Mosques at Jemawa,

Sansami, Muna fadi and Construction of Juma'at Prayer

Mosque at Kanya Town in Kanya Babba Constituency of

Babura Local Govt Area. Deetech Nig. Ltd. Babura 16,304,386.14 16,304,386.14 16,009,453.15 18/12/2017 12 Weeks 100 Completed

45

Construction of Five (5) daily Prayer Mosques at Mirgina,

Danbuwayi, Zuge, UnguwarKiwo, Dan Goriba and

Construction of Juma'at Prayer Mosque at Danbanki in Sule

Tankarkar Constituency. Bulangu Drilling Services S/tankarkar 22,536,624.84 22,536,624.84 21,463,452.24 18/12/2017 12 Weeks 100 Completed

46

Completion/Renovation of (1NO.) Friday Prayer Mosque 2018

Constituency Projects (Lot-54) at UZA in Auyo Constituency. Muhal Global Concept Ltd. Auyo 2,276,676.25 2,276,676.25 2,168,263.10 14/11/2018 8 weeks 100 Completed

47

Construction of (1NO.) Friday Prayer Mosque 2018

Constituency Projects (Lot-35) at Yalwa Dawai Village in

Birnin kudu Constituency. Nushe Business Resources B/kudu 7,300,090.20 7,300,090.20 7,037,590.20 14/11/2018 12 weeks 100 Completed

Balance C/F 463,093,364.52 465,885,200.53

8d

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN TC OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

Balance B/F 463,093,364.52 465,885,200.53

48

Completion/Renovation of (3NO.) Friday Prayer Mosque 2018

Constituency Projects (Lot-59) at Yarfi, Sharifori and Digijin

Village in Fagam Constituency, Gwaram L.G.A. G.M. Sara & Sons Ltd. Gwaram 5,203,805.88 5,203,805.88 5,003,624.64 14/11/2018 8 weeks 100 Completed

49

Completion/Renovation of (1NO.) Friday Prayer Mosque 2018

Constituency Projects (Lot-47B) at Likori in Kirikasamma

Constituency. Tosarawa Global Nig. Ltd. Kirikasamma 5,005,071.05 5,005,071.05 5,005,071.05 14/11/2018 8 weeks 100 Completed

50

Construction of (1NO.) Friday Prayer Mosque 2018

Constituency Projects (Lot-51) at Jibwis Sule Tankarkar in

Sule Tankarkar Constituency. Lautai Genaral Investment S/Tankarkar 7,960,852.75 7,960,852.75 7,610,355.95 14/11/2018 8 weeks 100 Completed

51

Completion/Renovation of (1NO.) Friday Prayer Mosque 2018

Constituency Projects at K/Fada in Sule Tankarkar

Constituency. Lautai Genaral Investment S/Tankarkar 6,506,264.97 6,506,264.97 6,414,745.17 14/11/2018 8 weeks 100 Completed

52

Construction of (1NO.) Friday Prayer Mosque 2018

Constituency Projects at Bebeji in Buji Constituency. Yayarin Tukur Nig. Ltd. Buji 8,267,235.04 8,267,235.04 7,873,557.18 14/11/2018 8 weeks 100 Completed

53

Construction of (1NO.) Friday Prayer Mosque 2018

Constituency Projects (Lot-45) at Wiwi in Kafin Hausa

Constituency. Danfatu & Sons Nig. Ltd. K/Hausa 3,996,672.02 3,996,672.02 3,996,672.01 14/11/2018 8 weeks 100 Completed

54

Completion/Renovation of (3NO.) Friday Prayer Mosque 2018

Constituency Projects (Lot-67) at Nisan Marke, Shafar and

Gidan K/H Ari in Ringim Constituency. Madanta Global Nig. Ltd. Ringim 16,816,456.06 16,816,456.06 16,709,406.06 14/11/2018 8 weeks 100 Completed

55

Construction of (1NO.) Friday Prayer Mosque 2018

Constituency Projects at Sarkin Dare in Gagarawa

Constituency. Amm Manzo Nig. Ltd. Gagarawa 10,561,294.91 10,561,294.91 10,058,376.11 14/11/2018 8 weeks 100 Completed

56

Completion/Renovation of (5NO.) Friday Prayer Mosque 2018

Constituency Projects (Lot-63) at Majerinzan Goma, Matakur,

Kutugum, Aduwa and D/Kyaure in Kafin Hausa Constituency. Amm Manzo Nig. Ltd. K/Hausa 16,853,819.38 16,853,819.38 13,140,583.66 14/11/2018 8 weeks 100 Completed

57

Construction of (1NO.) Friday Prayer Mosque 2018

Constituency Projects at Jikas in Gwaram Constituency. Amm Manzo Nig. Ltd. Gwaram 14,523,958.83 14,523,958.83 14,463,706.74 14/11/2018 8 weeks 100 Completed

58

Construction of (1NO.) Friday Prayer Mosque 2018

Constituency Projects at Girbobo in Kaugama Constituency. Amm Manzo Nig. Ltd. Kaugama 10,069,325.22 10,069,325.22 10,069,325.21 14/11/2018 8 weeks 100 Completed

59

Completion/Renovation of (5NO.) Friday Prayer Mosque 2018

Constituency Projects at Takwasa, Batali, Babura Central,

Jigawar Dan Ali and Babura Jibwis in Babura Constituency. Danfatu & Sons Nig. Ltd. Babura 11,560,530.17 11,560,530.17 11,010,028.73 19/11/2018 8 weeks 100 Completed

Balance C/F 580,418,650.80 583,210,486.81

8e

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN TC OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

Balance B/F 580,418,650.80 583,210,486.81

60

Completion/Renovation of (1NO.) Friday Prayer Mosque 2018

Constituency Projects (Lot-65) at Askandu in Kaugama

Constituency. Amm Manzo Nig. Ltd. Kaugama 6,219,763.56 6,219,763.56 6,020,579.08 14/11/2018 8 weeks 100 Completed

61

Construction of (1NO.) Friday Prayer Mosque 2018

Constituency Projects (Lot-53) at Sabuwa Village in

Yankwashi Constituency. Granitoids Engr. Service Ltd. Yankwashi 12,195,580.26 12,195,580.26 12,164,242.52 14/11/2018 12 weeks 100 Completed

62

Construction of (1NO.) Friday Prayer Mosque 2018

Constituency Projects (Lot-32) at Gamsarka in Auyo

Constituency. Muhal Global Concept Ltd. Auyo 7,026,996.02 7,026,996.02 6,692,377.15 24/12/2018 8 weeks 100 Completed

63

Construction of (1NO.) Friday Prayer Mosque 2018

Constituency Projects at K/Fada Sara in Gwaram

Constituency. Alh. Umaru Baban Doki Gwaram 15,941,139.39 15,941,139.39 15,925,657.32 31/12/2018 8 weeks 100 Completed

64

Completion/Renovation of (1NO.) Friday Prayer Mosque 2018

Constituency Projects (Lot-99) at Yan Makada in Kazaure

Constituency. Karami Constr. Co. Kazaure 18,118,618.22 18,118,618.22 17,255,827.82 14/11/2018 8 weeks 100 Completed

65

Construction of (1NO.) Friday Prayer Mosque 2018

Constituency Projects (Lot-37) at Nasarawan Kigudu in Fagam

Constituency Gwaram L.G.A. Sukudai Construction Nig. Ltd. Gwaram 7,274,348.35 7,274,348.35 7,259,747.80 14/11/2018 8 weeks 100 Completed

66

Completion/Renovation of (1NO.) Friday Prayer Mosque 2018

Constituency Projects (Lot-64) at Kaugama Town in Kaugama

Constituency. Nabakwai General Entp. Kaugama 17,890,045.00 17,890,045.00 17,780,488.09 14/11/2018 8 weeks 100 Completed

67

Completion/Renovation of (3NO.) Friday Prayer Mosque 2018

Constituency Projects (Lot-58) at Jibwis Kondiko, Dangulani

and Kijin Village in Fagam Constituency, Gwaram L.G.A. G.M. Sara & Sons Ltd. Gwaram 8,371,896.23 8,371,896.23 8,021,154.15 14/11/2018 8 weeks 100 Completed

68

Construction of (1NO.) Friday Prayer Mosque 2018

Constituency Projects at Makerabu Village in Gagarawa

Constituency. Modang Investment Ltd. Gagarawa 10,561,294.91 10,561,294.91 10,058,376.10 14/11/2018 8 weeks 100 Completed

69

Fencing of Kafin Hausa Jibwis Friday Prayer Mosque 2018

Constituency Projects (Lot-62) in Kafin Hausa Constituency. Faahm Intgrated Resources K/Hausa 2,403,328.04 2,403,328.04 1,998,822.04 14/11/2018 8 weeks 100 Completed

70

Construction of the (1 No.) Friday Prayer Mosque (2018 Phase

III) Constituency Projects (Lot-57) at Dansure in Roni

Constituency. Na'ayi Resources Nig. Ltd. Roni 4,550,100.85 4,550,100.85 4,550,100.85 23/11/2018 8 weeks 100 Completed

71

Construction of the (1 No.) Friday Prayer Mosque (2018 Phase

III) Constituency Projects (Lot-...) at Kadama in Roni

Constituency. Na'ayi Resources Nig. Ltd. Roni 9,527,340.25 9,527,340.25 9,317,340.24 23/11/2018 8 weeks 100 Completed

Balance C/F 700,499,101.88 703,290,937.89

8f

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN TC OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

Balance B/F 700,499,101.88 703,290,937.89

72

Construction of the (1 No.) Friday Prayer Mosque (2018 Phase

III) Constituency Projects (Lot-...) at Kwanar Yarshara in Roni

Constituency. Na'ayi Resources Nig. Ltd. Roni 9,527,340.25 9,527,340.25 9,317,340.24 23/11/2018 8 weeks 100 Completed

73

Construction of the (1 No.) Friday Prayer Mosque (2018 Phase

III) Constituency Projects (Lot-69) at Bashe and Amaryawa

Towns in Roni Constituency. Na'ayi Resources Nig. Ltd. Roni 13,161,630.65 13,161,630.65 12,534,886.32 23/11/2018 8 weeks 100 Completed

74

Construction of the (1 No.) Friday Prayer Mosque (2018 Phase

III) Constituency Projects (Lot-47) at Dinya Wayakawoka in

Jahun Constituency. Khairussabah Nig. Ltd. Jahun 4,411,465.20 4,411,465.20 4,201,395.42 23/11/2018 8 weeks 100 Completed

75

Construction of the (1 No.) Friday Prayer Mosque (2018 Phase

III) Constituency Projects (Lot-45) at Kulawa mai Kasuwa

Gauza in Jahun Constituency. Khairussabah Nig. Ltd. Jahun 9,942,198.00 9,942,198.00 9,937,789.05 24/12/18 8 weeks 100 Completed

76

Construction of the (1 No.) Friday Prayer Mosque (2018 Phase

III) Constituency Projects (Lot-71) at Sabon Garin Yaya in

Taura Constituency. ALLAH Abin Dogara Nig. Ltd. Taura 19,681,939.15 19,681,939.15 19,622,234.31 23/11/2018 8 weeks 100 Completed

77

Construction of the (1 No.) Friday Prayer Mosque (2018 Phase

III) Constituency Projects (Lot-43A) at Nasarawa Jibwis in

Gumel Constituency. Farham Synergy Concept Ltd. Gumel 15,210,520.70 15,210,520.70 15,155,375.19 23/11/2018 8 weeks 100 Completed

78

Construction of the (1 No.) Friday Prayer Mosque (2018 Phase

III) Constituency Projects (Lot-50) at Gareru in Kaugama

Constituency. Danfatu & Sons Nig. Ltd. Kaugama 8,120,321.42 8,120,321.42 7,733,639.44 23/11/2018 8 weeks 100 Completed

79

Construction of the (1 No.) Friday Prayer Mosque (2018 Phase

III) Constituency Projects (Lot-68) at Garun Gabas in Malam

madori Constituency. Step By Step intgrated Servic M/madori 15,819,389.40 15,819,389.40 15,766,085.13 23/11/2018 8 weeks 100 Completed

80

Completion/Renov. Of (2 No.) Friday Prayer Mosque (2018

Phase III) Constituency Projects (Lot-66) at Yalo and

Yanleman/Dakayyawa in Kaugama Constituency. Danfatu & Sons Nig. Ltd. Kaugama 12,471,560.90 12,471,560.90 11,949,935.26 23/11/2018 8 weeks 100 Completed

81

Construction of the (1 No.) Friday Prayer Mosque (2018 Phase

III) Constituency Projects (Lot-54) at Garin Makera in Ringim

Constituency. Marb Engr. Multi-Services Ringim 8,142,760.20 8,142,760.20 8,121,760.19 23/11/2018 8 weeks 100 Completed

82

Construction of the (1 No.) Friday Prayer Mosque (2018 Phase

III) Constituency Projects (Lot-53) at Yanduna in Ringim

Constituency. Marb Engr. Multi-Services Ringim 8,157,650.70 8,157,650.70 8,135,226.36 23/11/2018 8 weeks 100 Completed

83

Construction of the (1 No.) Friday Prayer Mosque (2018 Phase

III) Constituency Projects (Lot-44) at Kundiga in Gwiwa

Constituency. Jignaj Global Constructions Gwiwa 14,802,529.09 14,802,529.09 14,765,972.55 23/11/2018 8 weeks 100 Completed

Balance C/F 839,948,407.54 842,740,243.55

8g

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN TC OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

Balance B/F 839,948,407.54 842,740,243.55

84

Construction of the (1 No.) Friday Prayer Mosque (2018 Phase

III) Constituency Projects (Lot-...) at Yelwa in Buji

Constituency. Yayarin Tukur Nig. Ltd. Buji 12,518,061.42 12,518,061.42 11,921,962.85 23/11/2018 8 weeks 100 Completed

85

Construction of the (1 No.) Friday Prayer Mosque (2018 Phase

III) Constituency Projects (Lot-38) at Dagilfani in Birniwa

Constituency. AMM Manzo Nig. Ltd. Birniwa 10,900,793.17 10,900,793.17 10,133,120.74 29/11/2018 8 weeks 100 Completed

86

Construction of the (1 No.) Friday Prayer Mosque (2018 Phase

III) Constituency Projects (Lot-51) at Ubba in Kaugama

Constituency. Danfatu & Sons Nig. Ltd. Kaugama 8,110,126.52 8,110,126.52 7,723,931.07 23/11/2018 8 weeks 100 Completed

87

Construction of the (2No.) Daily Prayer Mosque (2018 Phase

III) Constituency Projects (Lot-31) at Gajin Gebi and

Margawa in Ringim Constituency. Marb Engr. Multi-Services Ringim 3,923,039.40 3,923,039.40 3,755,039.40 23/11/2018 6 weeks 100 Completed

88

Construction of the (1 No.) Friday Prayer Mosque (2018 Phase

III) Constituency Projects (Lot-53) at Yandutse in Ringim

Constituency. Marb Engr. Multi-Services Ringim 8,157,650.70 8,157,650.70 8,135,226.36 23/11/2018 8 weeks 100 Completed

89

Construction of the (1 No.) Friday Prayer Mosque (2018 Phase

III) Constituency Projects at Kwantamawa in Kafin Hausa

Constituency. Mugin Investment Nig. Ltd. K/Hausa 3,996,672.02 3,996,672.02 3,989,065.98 23/11/2018 8 weeks 100 Completed

90

Construction of the (1 No.) Friday Prayer Mosque (2018 Phase

III) Constituency Projects at G/Kanya in Kafin Hausa

Constituency. Mugin Investment Nig. Ltd. K/Hausa 3,996,672.02 3,996,672.02 3,989,065.98 23/11/2018 8 weeks 100 Completed

91

Construction of the (1 No.) Friday Prayer Mosque (2018 Phase

III) Constituency Projects at Zarga in Taura Constituency. Dankwara Maijimina Invest. Taura 8,373,590.40 8,373,590.40 8,373,590.40 23/11/2018 8 weeks 100 Completed

92

Construction of the (1 No.) Friday Prayer Mosque (2018 Phase

III) Constituency Projects at Wurma Town in Dutse

Constituency. H.M. Dangara Ltd. Dutse 2,401,479.28 2,401,479.28 2,316,649.70 23/11/2018 8 weeks 100 Completed

93

Construction of the (1 No.) Friday Prayer Mosque (2018 Phase

III) Constituency Projects at Matara Babba in Birniwa

Constituency. AMM Manzo Nig. Ltd. Birniwa 10,100,873.67 10,100,873.67 10,060,866.90 29/11/2018 8 weeks 100 Completed

94

Construction of the (1 No.) Friday Prayer Mosque (2018 Phase

III) Constituency Projects at Rabadi in Fagam Constituency. Ramadan Construction Ltd. Gwaram 8,167,025.88 8,167,025.88 7,778,119.88 23/11/2018 8 weeks 100 Completed

95

Construction of the (1 No.) Friday Prayer Mosque (2018 Phase

III) Constituency Projects at Ganji in Fagam Constituency. Ahmad Maidoya & Sons Gwaram 4,001,112.00 4,001,112.00 3,810,582.85 23/11/2018 8 weeks 100 Completed

Balance C/F 924,595,504.02 927,387,340.03

8h

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN TC OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

Balance B/F 924,595,504.02 927,387,340.03

96

Completion/Renovation of (3 No.) Friday Prayer Mosques

2018 Constituency Projects (Lot-67) at Nisan Marke, Shafar

and Gidan K/H Ari in Ringim Constituency. Madanta Global Nig. Ltd. Ringim 16,816,456.06 16,816,456.06 16,709,406.06 14/11/2018 8 weeks 100 Completed

97

Completion/Renovation of (6 No.) Friday Prayer Mosques

2018 Constituency Projects at Sugungun, Kanya, Gwarzo,

Zaidawa, G/Maza and Kargo in Garki Constituency. MMZ Garki Construction Nig. Garki 27,784,329.15 27,784,329.15 26,734,547.76 14/11/2018 8 weeks 100 Completed

98

Construction of the (1 No.) Friday Prayer Mosque (2018 Phase

II) Constituency Projects (Lot-49) at Romawa village in Miga

Constituency. Amia Integ. Service Nig Ltd. Miga 10,169,831.21 10,169,831.21 10,162,921.57 23/11/2018 8 weeks 100 Completed

99

Construction of the (1 No.) Friday Prayer Mosque (2018 Phase

II) Constituency Projects (Lot-52) at Akasan in Taura

Constituency. Dankwara Maijimina Invest. Taura 8,219,582.90 8,219,582.90 8,177,082.90 23/11/2018 8 weeks 100 Completed

100

Construction of the (1 No.) Friday Prayer Mosque (2018 Phase

II) Constituency Projects (Lot-57) at Meden Laban in

Gagarawa Constituency. Essence World Wide Service Gagarawa 8,229,020.55 8,229,020.55 8,171,044.38 23/11/2018 8 weeks 100 Completed

101

Construction of the (3 No.) Friday Prayer Mosque (2018 Phase

II) Constituency Projects (Lot-62) at Kiri Town

Gujungu/Civil Defence and Nomi in Taura Constituency. Essence World Wide Service Taura 21,345,568.24 21,345,568.24 19,823,715.94 23/11/2018 8 weeks 100 Completed

102

Construction of the (1 No.) Friday Prayer Mosque (2018 Phase

II) Constituency Projects at Danyayi in Kanya Babba

Constituency. Deetech Nig. Ltd. Babura 6,907,388.25 6,907,388.25 6,907,388.26 23/11/2018 8 weeks 100 Completed

103

Construction of the (1 No.) Friday Prayer Mosque (2018 Phase

II) Constituency Projects (Lot-42B) at Kafin Tugga in Fagam

Constituency. Yayarin Tukur Nig. Ltd. Gwaram 5,391,347.85 5,391,347.85 5,056,374.80 23/11/2018 8 weeks 100 Completed

104

Construction of the (1 No.) Friday Prayer Mosque (2018 Phase

II) Constituency Projects (Lot-38) at Digawar Kwando in

Babura Constituency. Danfatu & Sons Nig. Ltd. Babura 4,797,719.10 4,797,719.10 4,566,453.35 23/11/2018 8 weeks 100 Completed

105

Construction of the (1 No.) Friday Prayer Mosque (2018 Phase

II) Constituency Projects (Lot-58) at Malam Anas Madachi in

Kirikasamma Constituency. Wajedu Nig. Ltd. K/kasamma 13,008,460.55 13,008,460.55 12,413,468.55 23/11/2018 8 weeks 100 Completed

106

Construction of the (1 No.) Friday Prayer Mosque (2018 Phase

II) Constituency Projects (Lot-48) at Chanchanda in Malam

Madori Constituency. Wajedu Nig. Ltd. M/madori 10,102,692.86 10,102,692.86 9,931,523.67 23/11/2018 10 weeks 100 Completed

107

Construction of the (2 No.) Friday Prayer Mosque (2018 Phase

II) Constituency Projects (Lot-53) at Addani and Ringim in

Yankwashi Constituency. Granitoids Engr. Services Ltd Yankwashi 24,386,180.20 24,386,180.20 24,328,485.04 23/11/2018 8 weeks 100 Completed

Balance C/F 1,081,754,080.94 1,084,545,916.95

8i

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN TC OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

Balance B/F 1,081,754,080.94 1,084,545,916.95

108

Construction of the (1 No.) Friday Prayer Mosque (2018 Phase

II) Constituency Projects (Lot-39) at Lafiya Madabe in Buji

Constituency. Yayarin Tukur Nig. Ltd. Buji 12,518,061.42 12,518,061.42 11,921,963.25 23/11/2018 8 weeks 100 Completed

109

Construction of the (2 No.) Friday Prayer Mosque (2018 Phase

II) Constituency Projects (Lot-51) at Dandi and Nisan Marke

Towns in Ringim Constituency. Marb Engr. Multi-Services Ringim 4,272,234.94 4,272,234.94 4,068,795.17 23/11/2018 8 weeks 100 Completed

110

Construction of the (3 No.) Friday Prayer Mosque (2018 Phase

II) Constituency Projects (Lot-50) at K/Bashe, Tsabare and

G/Sani in Ringim Constituency. Marb Engr. Multi-Services Ringim 6,170,717.41 6,170,717.41 5,876,873.10 23/11/2018 8 weeks 100 Completed

111

Construction of the (4 No.) Friday Prayer Mosque (2018 Phase

II) Constituency Projects (Lot-61) at Kwalam, Wayu, Bardu

and Yangayami in Taura Constituency. Baban Doki General Enterp Taura 22,075,259.57 22,075,259.57 21,024,056.73 23/11/2018 8 weeks 100 Completed

112

Construction of the (1 No.) Friday Prayer Mosque (2018 Phase

II) Constituency Projects (Lot-59) at Kargo mai Makaranta in

Malam Madori Constituency. Ramadan Construction Nig. Ltd. M/Madori 14,081,577.61 14,081,577.61 14,072,137.80 23/11/2018 8 weeks 100 Completed

113

Construction of the (1 No.) Friday Prayer Mosque (2018 Phase

II) Constituency Projects (Lot-37) at Ganuwar Kuka in Auyo

Constituency. AMM Manzo Nig. Ltd. Auyo 10,604,774.94 10,604,774.94 10,597,464.93 23/11/2018 8 weeks 100 Completed

114

Construction of the (1 No.) Friday Prayer Mosque (2018 Phase

II) Constituency Projects (Lot-43) at Bula Sabuwa in

Gagarawa Constituency. A.G.M. & Sons Nig. Ltd. Gagarawa 9,245,690.00 9,245,690.00 9,245,690.00 23/11/2018 8 weeks 100 Completed

115

Construction of (2 No.) Five Daily Prayer Mosque (2018 Phase

II) Constituency Projects (Lot-20) at Tudun Alhazaiand

Maigazari in Gumel Constituency. Lautai Genaral Investment Gumel 3,831,916.20 3,831,916.20 3,746,645.70 23/11/2018 6 weeks 100 Completed

116

Construction of (3 No.) Five Daily Prayer Mosque (2018 Phase

II) Constituency Projects (Lot-19) at G/Dawa Kabawa,

Dahabu and Malaman Doko in Garki Constituency. MMz Garki Construction Nig. Garki 5,846,768.55 5,846,768.55 5,614,950.00 23/11/2018 6 weeks 100 Completed

117

Construction of (2 No.) Five Daily Prayer Mosque (2018 Phase

II) Constituency Projects at Bayan GSS Wunti and Unguwar

Danjani in Hadejia Constituency. Jiffa Enterprises Hadejia 3,912,545.07 3,912,545.07 3,532,839.03 23/11/2018 6 weeks 100 Completed

118

Construction of (4 No.) Five Daily Prayer Mosque (2018 Phase

II) Constituency Projects at Kagadama, Sarkin Gabas, Madaka

and Gamji in Gagarawa Constituency. Essence World Wide Service Gagarawa 7,835,700.60 7,835,700.60 7,807,061.39 23/11/2018 6 weeks 100 Completed

119

Construction of (2 No.) Five Daily Prayer Mosque (2018 Phase

II) Constituency Projects (Lot-36) at Rafin kanya and Garin

Kuttu in Taura Constituency. Nushe Business Resources Taura 3,918,404.70 3,918,404.70 3,743,300.00 23/11/2018 8 weeks 100 Completed

Balance C/F 1,186,067,731.95 1,188,859,567.96

8j

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN TC OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

Balance B/F 1,186,067,731.95 1,188,859,567.96

120

Construction of (3 No.) Five Daily Prayer Mosque (2018 Phase

II) Constituency Projects at Kubuna, Dolen Kwana and

Karanga in Birniwa Constituency. AMM Manzo Nig. Ltd. Birniwa 5,878,268.25 5,878,268.25 5,783,768.23 23/11/2018 6 weeks 100 Completed

121

Construction of (1 No.) Five Daily Prayer Mosque (2018 Phase

II) Constituency Projects (Lot-29) at Barbawa in Kaugama

Constituency. Danfatu & Sons Nig. Ltd. Kaugama 1,952,522.85 1,952,522.85 1,930,022.85 23/11/2018 6 weeks 100 Completed

122

Construction of (2 No.) Five Daily Prayer Mosque (2018 Phase

II) Constituency Projects (Lot-3) at Yammaulu Insharuwa

ward Karade in Babura Constituency. Danfatu & Sons Nig. Ltd. Babura 3,918,845.70 3,918,845.70 3,755,045.70 23/11/2018 6 weeks 100 Completed

123

Construction of (1 No.) Five Daily Prayer Mosque (2018 Phase

II) Constituency Projects at Kankaren Shatima in Maigatari

Constituency. ALLAH Abin Dogara Nig. Ltd. Maigatari 1,959,107.85 1,959,107.85 1,877,522.85 23/11/2018 6 weeks 100 Completed

124

Construction of (3 No.) Five Daily Prayer Mosque (2018 Phase

III) Constituency Projects at Kankaren Bakin Ruwa,

Kankaren Madawa and Idari in Maigatari Constituency. NBS & Sons Construction Nig. Maigatari 5,878,268.50 5,878,268.50 5,632,568.55 23/11/2018 6 weeks 100 Completed

125

Construction of (3 No.) Five Daily Prayer Mosque (2018 Phase

III) Constituency Projects (Lot-6) at Malamawar G/Kwalli,

Azare Sabuwa and Kalgeri in Bulangu Constituency. Kawu Nig. Ltd. K/Hausa 5,881,121.97 5,881,121.97 5,795,089.17 23/11/2018 6 weeks 100 Completed

126

Construction of (3 No.) Five Daily Prayer Mosque (2018 Phase

III) Constituency Projects (Lot-5) at Sabon Gidan Jabo,

Fadawa Karama and Dokori in Bulangu Constituency. Kawu Nig. Ltd. K/Hausa 5,869,568.55 5,869,568.55 5,645,892.31 23/11/2018 6 weeks 100 Completed

127

Construction of (3 No.) Five Daily Prayer Mosque (2018 Phase

III) Constituency Projects (Lot-21) at Sabaru Gabas, Gada

Yamma and Kanti Gabas in Kazaure Constituency. Yanduna Ventures Nig. Ltd. Kazaure 5,881,418.50 5,881,418.50 5,632,568.55 23/11/2018 6 weeks 100 Completed

128

Construction of (4 No.) Five Daily Prayer Mosque (2018 Phase

III) Constituency Projects at Dan Karaye, Bindaye, Lafiya and

Kokochi in Taura Constituency. Sambu Synergy Concept Ltd. Taura 7,830,026.40 7,830,026.40 7,486,599.96 23/11/2018 6 weeks 100 Completed

129

Construction of (2 No.) Five Daily Prayer Mosque (2018 Phase

III) Constituency Projects (Lot-25) at Malam Abba and

Alagarno in Maigatari Constituency. Nadada Ventures Nig. Ltd. Maigatari 3,919,263.76 3,919,263.76 3,721,445.70 23/11/2018 6 weeks 100 Completed

130

Construction of (1 No.) Five Daily Prayer Mosque (2018 Phase

III) Constituency Projects at Baramusa in Malam Madori

Constituency. Step By Step intgrated Servic M/Madori 10,100,798.17 10,100,798.17 9,621,612.18 23/11/2018 8 weeks 100 Completed

Balance C/F 1,245,136,942.45 1,247,928,778.46

8k

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN TC OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

Balance B/F 1,245,136,942.45 1,247,928,778.46

131

Construction of (3 No.) Five Daily Prayer Mosque (2018 Phase

III) Constituency Projects (Lot-...) at Dallare, Barebari

Sankara and Digawar Kurmi in Ringim Constituency. Marb Engr. Multi-Services Ringim 5,884,568.55 5,884,568.55 5,632,568.55 23/11/2018 6 weeks 100 Completed

132

Construction of (3 No.) Five Daily Prayer Mosque (2018 Phase

III) Constituency Projects (Lot-30) at Kaki Kankare,

Larabawa and Daunawa in Ringim Constituency. Marb Engr. Multi-Services Ringim 5,882,678.50 5,882,678.50 5,630,678.48 23/11/2018 6 weeks 100 Completed

133

Construction of (1 No.) Five Daily Prayer Mosque (2018 Phase

III) Constituency Projects (Lot-3) at Yayarin Tukur Town in

Buji Constituency. Yayarin Tukur Nig. Ltd. Buji 1,961,519.70 1,961,519.70 1,877,522.80 23/11/2018 6 weeks 100 Completed

134

Construction of (2 No.) Two Daily Prayer Mosque 2018

Constituency Projects at Masheme and Tangari Tsagaya in

Garki Constituency. MMZ Garki Constr. Nig. Garki 3,915,162.00 3,915,162.00 3,743,809.45 14/11/2018 8 weeks 100 Completed

135

Construction of wall fencing and Grave yard (2018 phase II)

constituency projects (lot -64B) at B/Zango in Gwaram

Constituncy. Yayarin Tukur Nig Ltd Gwaram 10,524,058.65 10,524,058.65 10,022,912.99 23/11/2018 8 weeks 100 Completed

136

Construction of wall fencing and Grave yard (1No.) (2018

phase II) constituency projects (lot -65) at Dakayyawa town

in Kaugama Constituncy. Nabakwai Gen. Enterp Ltd Kaugama 10,175,937.42 10,175,937.42 10,161,792.63 23/11/2018 10 weeks 100 Completed

137

Completion/Renov. Of (1no.)Friday Prayer Mosque (2018

phase III) Constituency Projects (Lot-67 ) at Gada yamma in

kazaure Constituency. Yanduna Venture Nig Ltd kazaure 3,268,000.00 3,268,000.00 3,112,380.94 23/11/2018 8 weeks 100 Completed

138

Construction of (5No) five daily prayer mosques (2018 phase

II) constituency project (Lots -32) at agufa Gabas, markawa,

kadirawa,sarawiya and maiganjara in miga constituency Amia interg. Serv.Nig. Ltd Miga 9,781,364.25 9,781,364.25 9,361,364.25 23/11/2018 6 weeks 100 Completed

139

Construction of wall fencing, External works and Solar

Electricity Supply (2018 phase III) constituency projects at

JIBWIS Juma'at Mosque Basirka in Fagam Constituncy. Lines and Dimension Nig. Ltd Gwaram 12,484,914.10 12,484,914.10 11,890,363.80 31/12/18 8 weeks 100 Completed

140

Construction of wall fencing and Grave yard (2018 phase II)

constituency projects (lot -) at Kukuma in Buji Constituncy. Yayarin Tukur Nig Ltd Buji 8,320,638.93 8,320,638.93 7,954,570.48 23/11/2018 8 weeks 100 Completed

141

Renov. Of District Head house (2018 phase III) Constituency

Projects (Lot-26 ) at Auyo in Auyo Constituency. Na-bakwai Enterp. Ltd Auyo 6,127,766.75 6,127,766.75 5,835,963.33 23/11/2018 8 weeks 100 Completed

Balance C/F 1,323,463,551.30 1,326,255,387.31

8L

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN TC OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

Balance B/F 1,323,463,551.30 1,326,255,387.31

142

Construction of wall fencing and Grave yard (2018 phase II)

constituency projects (lot -) at Kiyawa Gabas kiyawa

Constituncy. AGM & Sons Nig. Ltd kiyawa 11,146,344.60 11,146,344.60 11,024,014.57 23/11/2018 8 weeks 100 Completed

143

Construction of wall fencing and Grave yard (2018 phase II)

constituency projects (lot -) at Gagara Yaga town in Gwaram

LGA AS Gaza inter. Serv. Nig ltd Gwaram 13,260,534.00 13,260,534.00 13,200,390.77 27/11/2018 8 weeks 100 Completed

144

Completion/Renov. Of (1no.)Friday Prayer Mosque (2018

phase III) Constituency Projects (Lot-65 ) at Yoruba Juma'at

mosque in Hadejia Constituency. Muhal Global concept Hadejia 4,013,760.20 4,013,760.20 3,822,702.10 23/11/2018 8 weeks 100 Completed

145

Completion/Renov. Of (2no.)Friday Prayer Mosque (2018

phase III) Constituency Projects (Lot- 62) at Shamakeri in

Bulangu Constituency. Kawu Nig. Ltd. K/Hausa 11,250,950.40 11,250,950.40 10,714,848.00 27/12/18 8 weeks 100 Completed

146

Completion/Renov. Of (2no.) Friday Prayer Mosque (2018

phase III) Constituency Projects (Lot-60) at Waloyi sabuwa,

JIBWIS Juma'at mosque in Bulangu Constituency. Kawu Nig Ltd K/Hausa 12,674,985.00 12,674,985.00 12,674,985.00 23/11/2018 8 weeks 100 Completed

147

Construction of (3No.) Friday prayer Mosque (2018 phase II)

Constituency project (lot -40) at Zangon kanya, waloyi

sabuwa and Tsangaiwa in Bulangu Constituency Kawu Nig Ltd K/Hausa 16,888,035.21 16,888,035.21 16,797,853.60 23/11/2018 8 weeks 100 Completed

148

Construction Of (4no.) five daily Prayer Mosques (2018 phase

II) Constituency Projects (Lot-30) at sabaru, Batatsaba and

Tudun wayo in kazaure Constituency. Yanduna Venture Nig Ltd kazaure 7,833,491.40 7,833,491.40 7,285,022.85 23/11/2018 6 weeks 100 Completed

149

Construction Of (2no.) five daily Prayer Mosques (2018 phase

III) Constituency Projects (Lot-) at kofar yamma anad rukutu

in Sule Tankarkar Constituency. Na'ayi Resources Ltd S/tankarkar 5,375,297.80 5,375,297.80 5,112,128.79 23/11/2018 8 weeks 100 Completed

150

Construction Of (5no.) five daily Prayer Mosques (2018 phase

III) Constituency Projects (Lot-7) at kuntukulu, yarma,

chiliga, Nafada and giwa in Birnin Kudu Constituency. Nushe Bus. Resou. Nig Ltd B/kudu 9,799,739.25 9,799,739.25 9,379,739.25 23/11/2018 8 weeks 100 Completed

151

Construction Of (2no.) five daily Prayer Mosques (2018 phase

II) Constituency Projects (Lot-) at kadira and tukuikui town

in guri Constituency. Jiffa enterprises Guri 3,912,545.07 3,912,545.07 3,606,083.67 23/11/2018 6 weeks 100 Completed

Balance C/F 1,419,619,234.23 1,422,411,070.24

8m

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN TC OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

Balance B/F 1,419,619,234.23 1,422,411,070.24

152

Construction Of (3no.) five daily Prayer Mosques (2018 phase

II) Constituency Projects (Lot-) at Riga yoka, kubulu and abir

in guri Constituency. Jiffa enterprises Guri 5,881,418.55 5,881,418.55 5,629,418.55 23/11/2018 6 weeks 100 Completed

153

Construction Of (3no.) five daily Prayer Mosques (2018 phase

II) Constituency Projects (Lot-23) at Dadin duniya, kargo and

maje gari in kiyawa Constituency. FAAHM Intreg. Resour. Ltd kiyawa 5,872,358.50 5,872,358.50 5,489,381.48 23/11/2018 6 weeks 100 Completed

154

Construction Of (4no.) five daily Prayer Mosques (2018 phase

II) Constituency Projects (Lot-19) at U/malam, kununrogo,

kankare and timbau in kanya babba Constituency. Deetech Nig Ltd Babura 7,846,091.40 7,846,091.40 7,510,091.40 23/11/2018 6 weeks 100 Completed

156

Construction Of (6no.) five daily Prayer Mosques (2018 phase

II) Constituency Projects (Lot-5) at Barwa, K/boka, Bulliti,

Dokaro, Lafiya and Jingargari in Birnin Kudu Constituency. Nushe Bus. Resou. Nig Ltd B/kudu 11,733,404.10 11,733,404.10 11,229,404.13 23/11/2018 8 weeks 100 Completed

157

Construction Of (5no.) five daily Prayer Mosques (2018 phase

II) Constituency Projects (Lot-4) at Chandam, Daurawa, Ajawa

bkd, Juwan Tudu and Ludduga in Birnin Kudu Constituency. Nushe Bus. Resou. Nig Ltd B/kudu 9,782,614.25 9,782,614.25 9,362,614.27 23/11/2018 8 weeks 100 Completed

158

Construction Of (4no.) five daily Prayer Mosques (2018 phase

III) Constituency Projects (Lot-) at Masama, Malumawa,

Jinnako and Kintiri in Kirikasamma Constituency. Dabino interg.serv. Ltd Kirikasamma 7,085,135.75 7,085,135.75 6,865,270.06 23/11/2018 6 weeks 100 Completed

159

Construction Of (1no.) five daily Prayer Mosques (2018 phase

III) Constituency Projects (Lot-) at Kirikasamma police

station in Kirikasamma Constituency. Dabino interg.serv. Ltd Kirikasamma 1,196,120.45 1,196,120.45 1,194,714.15 23/11/2018 8 weeks 100 Completed

160

Construction Of (1no.) five daily Prayer Mosques (2018 phase

III) Constituency Projects (Lot-) at Garin Kosau in Maigatari

Constituency. Nadada Venture Nig Ltd Maigatari 1,952,627.20 1,952,627.20 1,913,222.85 23/11/2018 8 weeks 100 Completed

161

Construction Of (2no.) five daily Prayer Mosques (2018 phase

III) Constituency Projects (Lot-17) at Jabarna and Jahun Gabas

in Jahun Constituency. Khairussabah Nig ltd Jahun 3,918,645.50 3,918,645.50 3,746,645.70 23/11/2018 6 weeks 100 Completed

162

Construction Of (4no.) five daily Prayer Mosques (2018 phase

III) Constituency Projects (Lot-27) at Makera, Malikawa, Da'a

and Atafiyawar Gyatami in Miga Constituency. Khairussabah Nig ltd Miga 7,842,091.36 7,842,091.36 7,821,452.56 23/11/2018 6 weeks 100 Completed

163

Construction Of (3no.) five daily Prayer Mosques (2018 phase

III) Constituency Projects (Lot-28) atDunnaka, koramawa and

Gidan Yaya in Miga Constituency. Khairussabah Nig ltd Miga 5,880,473.55 5,880,473.55 5,864,986.05 23/11/2018 6 weeks 100 Completed

Balance C/F 1,488,610,214.84 1,491,402,050.85

8n

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN TC OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

Balance B/F 1,488,610,214.84 1,491,402,050.85

164

Construction Of (3no.) five daily Prayer Mosques (2018 phase

III) Constituency Projects (Lot-) at Gaduwa, Tsangaya Yamma

and U/buluburum in Guri Constituency. AMIM Consult Nig Ltd Guri 5,877,322.55 5,877,322.55 5,617,993.50 23/11/2018 6 weeks 100 Completed

165

Construction Of (1no.) five daily Prayer Mosques (2018 phase

III) Constituency Projects (Lot-) at Tasgen yamma in Guri

Constituency. AMIM Consult Nig Ltd Guri 1,959,420.85 1,959,420.85 1,877,522.85 23/11/2018 6 weeks 100 Completed

166

Construction Of (3no.) five daily Prayer Mosques (2018 phase

III) Constituency Projects (Lot-) at Guri, Galadimari and

Majanguwa in Guri Constituency. Jiffa enterprises Guri 5,882,678.05 5,882,678.05 5,630,678.04 23/11/2018 6 weeks 100 Completed

167

Construction Of (3no.) five daily Prayer Mosques (2018 phase

III) Constituency Projects (Lot-10) at U/Gamji, Wale wale and

M/tahir in Garki Constituency. Mugin Inv. Nig ltd Garki 5,878,007.61 5,878,007.61 5,626,007.60 23/11/2018 6 weeks 100 Completed

168

Construction Of (4no.) five daily Prayer Mosques (2018 phase

II) Constituency Projects (Lot-) at Kurgunguma, babande,

koguran sabuwa and wauta in Garki Constituency. MMZ Garki contr. Nig Ltd Garki 7,841,169.36 7,841,169.36 7,510,091.40 23/11/2018 6 weeks 100 Completed

169

Construction Of (3no.) five daily Prayer Mosques (2018 phase

II) Constituency Projects (Lot-16) at Dandaga, Kangarwa and

Dogon dawa in Gagarawa Constituency. Essence world wide serv. Nig ltd Gagarawa 5,876,775.45 5,876,775.45 5,854,621.16 23/11/2018 6 weeks 100 Completed

170

Construction Of (5no.) five daily Prayer Mosques (2018 phase

II) Constituency Projects (Lot-6) at Damukashi, Lura, Asayaya

and Sundumina, Nafara in Birnin Kudu Constituency. Nushe Bus. Resou. Nig Ltd B/Kudu 9,807,614.25 9,807,614.25 9,387,614.25 23/11/2018 8 weeks 100 Completed

171

Construction Of (3no.) five daily Prayer Mosques (2018 phase

II) Constituency Projects (Lot-35) at Titi Town, Danmakama

and Adama in Sule Tankarkar Constituency. Nushe Bus. Resou. Nig Ltd S/Tankarkar 5,877,323.55 5,877,323.55 5,859,968.55 23/11/2018 8 weeks 100 Completed

172

Construction Of (4no.) five daily Prayer Mosques (2018 phase

III) Constituency Projects (Lot-16) at Dakila, Tauraruwa,

ankun Yamma and Matsaro in Hadejia Constituency. Xtrax 99 Interg. Serv. Nig Ltd Hadejia 7,844,831.40 7,844,831.40 7,192,088.07 23/11/2018 6 weeks 100 Completed

173

Construction Of (1no.) five daily Prayer Mosques (2018 phase

III) Constituency Projects (Lot-54) at Uza in Auyo

Constituency. Muhal Global concept Auyo 2,276,676.25 2,276,676.25 2,276,676.00 23/11/2018 8 weeks 100 Completed

174

Construction Of (3no.) five daily Prayer Mosques (2018 phase

III) Constituency Projects (Lot-) at Jidawa, Kwannawa and

G/Darmara in Dutse Constituency. H.M Dangara ltd Dutse 5,879,843.00 5,879,843.00 5,628,473.55 23/11/2018 6 weeks 100 Completed

Balance C/F 1,553,611,877.16 1,556,403,713.17

8O

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN TC OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

Balance B/F 1,553,611,877.16 1,556,403,713.17

175

Construction Of (4no.) five daily Prayer Mosques (2018 phase

III) Constituency Projects (Lot-14) at Innakawa, Uduwa,

Lambuna and sabon garin ila in Gwaram Constituency. Yayarin Tukur Nig Ltd Gwaram 7,846,076.80 7,846,076.80 7,510,076.78 23/11/2018 6 weeks 100 Completed

176

Construction Of (6no.) five daily Prayer Mosques (2018 phase

III) Constituency Projects (Lot-17) at Kira Malumawar jabo,

satari, malumawar Jigawa,Alagarno and Lugga towns in

Bulangu K/Hausa Constituency, K/Hausa LGA. Kawu Nig Ltd K/Hausa 11,733,900.00 11,733,900.00 11,701,539.00 23/11/2018 8 weeks 100 Completed

178

Construction Of (4no.) five daily Prayer Mosques (2018 phase

II) Constituency Projects (Lot-10) at U/maina, Yara dankoshe,

karanjau and musa d/hajiya kukuma in Buji Constituency. Yayarin Tukur Nig Ltd Buji 7,825,091.40 7,825,091.40 7,469,528.43 23/11/2018 6 weeks 100 Completed

179

Construction Of (1no.) five daily Prayer Mosques (2018 phase

II) Constituency Projects (Lot-56) at Sara Kudu in Gwaram

Constituency. Yayarin Tukur Nig Ltd Gwaram 1,956,272.85 1,956,272.85 1,872,272.85 23/11/2018 6 weeks 100 Completed

180

Construction Of (3no.) five daily Prayer Mosques (2018 phase

II) Constituency Projects (Lot-24) at Kawal Gana, Bye pass

Gwaram and Maruta in Gwaram Constituency. Yayarin Tukur Nig Ltd Gwaram 5,868,818.55 5,868,818.55 5,616,818.55 23/11/2018 6 weeks 100 Completed

181

Construction Of (3no.) five daily Prayer Mosques (2018 phase

II) Constituency Projects (Lot-13) at Basirka A, Ali Kondigo

and madachi in Fagam Constituency. G.M Sara & sons Nig Ltd Gwaram 5,881,568.55 5,881,568.55 5,635,339.62 23/11/2018 8 weeks 100 Completed

182

Construction Of (3no.) five daily Prayer Mosques (2018 phase

II) Constituency Projects (Lot-15) at Yarfi, Gadama and

Dingaya in Fagam Constituency. G.M Sara & sons Nig Ltd Gwaram 5,875,118.55 5,875,118.55 5,628,905.75 23/11/2018 8 weeks 100 Completed

183

Construction Of (3no.) five daily Prayer Mosques (2018 phase

II) Constituency Projects (Lot-14) at Basirka Tsangaya,

S/Ruwa Digijin and chediya in Fagam Constituency. G.M Sara & sons Nig Ltd Gwaram 5,880,586.95 5,880,586.95 5,634,360.48 23/11/2018 8 weeks 100 Completed

184

Construction Of (2no.) five daily Prayer Mosques (2018 phase

III) Constituency Projects (Lot-) at Gugurum and Wargale in

Birniwa Constituency. B.D.U Vent. Nig Ltd Birniwa 3,907,045.70 3,907,045.70 3,738,247.48 23/11/2018 6 weeks 100 Completed

185

Construction Of (1no.) five daily Prayer Mosques (2018 phase

III) Constituency Projects (Lot-26) at Inaruwanku in Malam

madori Constituency. Wajedu Nig Ltd M/madori 1,961,519.70 1,961,519.70 1,871,650.00 23/11/2018 6 weeks 100 Completed

186

Construction of (2No.) Friday Prayer Mosques 2018

Constituency Projects at Mamudawa and U/Kaya in Roni

Constituency. Na'ayi Resources Ltd. Roni 18,967,013.14 18,967,013.14 18,063,822.04 14/11/2018 8 weeks 100 Completed

Balance C/F 1,631,314,889.35 1,634,106,725.36

8p

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN TC OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

Balance B/F 1,631,314,889.35 1,634,106,725.36

187

Completion/Renovation of (2 No.) Friday Prayer Mosque

(2018 Phase III) Constituency Projects at Farin Dutse and

Chediya Towns in Fagam Constituency. A.A. Maikatako Gen. Enterp. Gwaram 13,213,177.10 13,213,177.10 12,583,978.18 23/11/2018 8 weeks 100 Completed

188

Construction of (2 No.) Daily Prayer Mosque (2018 Phase III)

Constituency Projects (Lot-1) at Zigon Fulani and Kataudi in

Auyo Constituency. Wajedu Nig. Ltd. Auyo 3,923,039.45 3,923,039.45 3,755,045.70 23/11/2018 6 weeks 100 Completed

189

Construction of (1 No.) Daily Prayer Mosque (2018 Phase III)

Constituency Projects at Ashura Madaki in Kafin Hausa

Constituency. Mugin Investment Nig. Ltd. K/Hausa 1,959,335.00 1,959,335.00 1,877,522.85 11/12/2018 8 weeks 100 Completed

190

Construction of (1 No.) Five Daily Prayer Mosque (2018 Phase

II) Constituency Projects (Lot-56) at Unguwar Kanya in

Gwaram Constituency. Yayarin Tukur Nig. Ltd. Gwaram 1,959,790.35 1,959,790.35 1,875,790.35 14/12/2018 8 weeks 100 Completed

191

Construction of (3No.) Five Daily Prayer Mosques (2018

Phase II) Constituency Projects (Lot-1) at Maje Hausawa,

Jama'ar Alkali and Muran in Auyo Constituency. Ahmed Maidoya & Sons Auyo 5,821,382.70 5,821,382.70 5,569,382.70 23/12/2018 6 weeks 100 Completed

192

Construction of (1No.) Friday Prayer Mosques (2018 Phase

III) Constituency Projects at Baramusa in Malam madori

Constituency. Step by Step Interg. Serv M/madori 10,100,798.17 10,100,798.17 9,621,612.18 31/12/2018 8 weeks 100 Completed

193

Construction of (3No.) Five Daily Prayer Mosques (2018

Phase II) Constituency Projects (Lot-2) at Dogon Marke Tudu,

Takwasa and Akula Quarters Babura in Babura Constituency. Express Innovation Concept Babura 5,787,583.55 5,787,583.55 5,452,528.54 23/11/2018 6 weeks 100 Completed

194

Completion/Renovation of (1No.) Friday Prayer Mosques

2018 Constituency Projects (Lot-68) at Zugai in Roni

Constituency. Yanduna Ventures Ltd. Roni 4,231,861.26 4,231,861.26 4,030,352.45 14/11/2018 8 weeks 100 Completed

195

Construction of (1No.) Friday Prayer Mosques 2018

Constituency Projects at Kargo in Jahun Constituency. Yanduna Ventures Ltd. Jahun 3,674,875.89 3,674,875.89 3,596,966.88 14/11/2018 8 weeks 100 Completed

196

Renovation of (1No.) Juma'at Prayer Mosques (2018 Phase III)

Constituency Projects (Lot-59A) at Gatafa in Auyo

Constituency. A.G.M. & Sons Nig. Ltd. Auyo 9,331,213.96 9,331,213.96 9,327,464.19 24/12/2018 8 weeks 100 Completed

197

Construction of (3No.) Daily Prayer Mosques (2018 Phase III)

Constituency Projects Karofin Tsamiya, Maje and Ruwan

Dutse and completion of (1No.) Daily Prayer Mosques at Roni

Unguwar Sani Kwati in Roni Constituency. Na'ayi Resources Ltd. Roni 7,821,847.00 7,821,847.00 7,372,828.41 17/12/2018 6 weeks 100 Completed

198

Construction of (2No.) Daily Prayer Mosques (2018 Phase III)

Constituency Projects (Lot-2) at Aunaka and Katirje Fulani in

Babura Constituency. A.A. Aljazeera Agro Proc. Babura 3,919,049.70 3,919,049.70 3,755,045.70 23/11/2018 6 weeks 100 Completed

Balance C/F 1,703,058,843.48 1,705,850,679.49

8q

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN TC OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

Balance B/F 1,703,058,843.48 1,705,850,679.49

199

Completion/Renovation of (1No.) Friday Prayer Mosques

(2018 Phase III) Constituency Projects at Danyarda Gari in

Sule Tankarkar Constituency. A.A. Aljazeera Agro Proc. S/Tankarkar 2,820,120.00 2,820,120.00 2,565,078.56 23/11/2018 8 weeks 100 Completed

200

Construction of (4No.) Five Daily Prayer Mosques (2018 Phase

III) Constituency Projects at Darare, Gwanda Gwaro, Udawaki

and Ma'azu in Sule Tankarkar Constituency. A.A. Aljazeera Agro Proc. S/Tankarkar 7,841,891.40 7,841,891.40 7,510,091.40 23/11/2018 6 weeks 100 Completed

201

Constr of (1no) Friday mosque at Kuda in Yankwashi (2018

phase III) constituency project Deetech Nig Ltd. Ynakwashi 15,576,291.17 15,576,291.17 15,417,313.02 17/12/2018 12 Weeks 100 Completed

202

Renov of Jumaat Mosque (2018 phase III) consultancy project

(Lot-35) at Masko in Babura Muhabib Nig Ltd Babura 4,545,883.87 4,545,883.87 4,534,163.18 25/11/2018 8 weeks 100 Completed

203

Constr of Juma'at Prayer mosques 2017 constituency projects

phase III remaining works (Lot-5) at Sunkuye and Suga in

Kirikasamma Constituency. Alh Umaru Babandoki K/Kasamma 16,539,295.58 16,539,295.58 16,215,864.03 16/4/2018 12 weeks 100 On-going

TOTAL 1,750,382,325.50 1,753,174,161.51

8r

Ministry of Information

P OST C ON T R A C T P R OJEC T EVA LUA T ION

S/ N P R OJEC T EXEC UT OR LOC A T IONC ON T R A C T A M OUN T R EVISED VA LUE OF C OM M EN C EM EN TC OM P L. ST A T US R EM A R KS

(N ) C ON T R A C T SUM (N ) C ER T IF IED WOR K D A T E P ER IOD IN %

1 Procurement of Electrical Equipments (phase 1) Zurfat Investment Nig. Ltd Dutse 18,049,500.00 18,049,500.00 16,371,428.57 30/04/2019 4 weeks 100 Completed

2 Renov of Gumel township stadium Farham Synergy Gumel 34,986,981.93 34,986,981.93 34,981,927.27 10/1/2019 6 weeks 100 Completed

3 Renov of Hadejia township stadium Kawu Nig. Ltd. Hadejia 5,588,405.03 5,588,405.03 5,326,332.60 17/10/2019 4 weeks 100 Completed

4 Renov of Dutse Sports Complex Gare Invest. Nig. Ltd. Dutse 18,192,343.02 18,192,343.02 18,192,337.17 10/1/2019 12 weeks 100 Completed

5 Renov of Dutse township stadium M aikatako & Sons Dutse 9,749,837.85 9,749,837.85 8,446,140.81 12/11/2019 4 weeks 100 Completed

6 Renov of Dutse township stadium (additional works) Pullad Global Dutse 8,621,123.75 8,621,123.75 8,420,632.05 20/02/20 4 weeks 100 Completed

Total 95,188,191.58 95,188,191.58

Jigawa State Polytechnic

POST CONTRACT PROJECT EVALUATION

S/ N P R OJEC T EXEC UT OR LOC A T IONC ON T R A C T A M OUN T R EVISED VA LUE OF C OM M EN C EM EN TC OM P L. ST A T US R EM A R KS

(N ) C ON T R A C T SUM (N ) C ER T IF IED WOR K D A T E P ER IOD IN %

1 Constr of Wall fence Loyalty Property Dutse 16,404,601.62 16,404,601.62 16,386,322.31 28/01/19 12 weeks 100 Completed

Total 16,404,601.62 16,404,601.62

Binyaminu Polytechnic Hadejia

P OST C ON T R A C T P R OJEC T EVA LUA T ION

S/ N P R OJEC T EXEC UT OR LOC A T ION C ON T R A C T A M OUN T REVISED VA LUE OF C OM M EN C EM EN T C OM P L. ST A T US R EM A R KS

(N ) CONTRACT SUM (N) C ER T IF IED WOR K D A T E P ER IOD IN %

1

Fabrication of (300no.) Detached classroom Desk K-Manu Eng. Ltd. Hadejia 9,090,000.00 9,090,000.00 9,089,999.99 22/10/2018 12 w eeks 100 Completed

TOTAL 9,090,000.00 9,090,000.00

Ministry of Environment

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

1 Constr. of Drainage at K/fada basirka (phase II) Dazal Nig. Ltd. Gwaram 8,236,789.42 8,236,789.42 8,127,129.15 18/09/2017 8 weeks

100

Completed

2

Construction of Drainages at makwalla (A) and

Unguwar sarkin Busa Quarters in Hadejia Local

Govt area Muhal Global concept Hadejia 41,936,999.19 41,936,999.19 41,936,999.19 23/11/2018 16 weeks

100

Completed

Total 50,173,788.61 50,173,788.61

Informatics Institute Kazaure

P OST C ON T R A C T P R OJEC T EVA LUA T ION

S/ N . P R OJEC T EXEC UT OR LOC A T ION CONTRACT REVISED VA LUE OF C OM M EN C EM EN TC OM P L. ST A T US R EM A R KS

AMOUNT CONTRACT SUM (N) C ER T IF IED WOR K D A T E P ER IOD IN %

1 Renov ation of 40 rooms male hostel Talaku Int. Serv ices Ltd. Kazaure 17,023,989.64 17,023,989.64 17,023,870.97 29/11/2017 8 w eeks 100 Completed

2 Renov ation of Female Hostel Talaku Int. Serv ices Ltd. Kazaure 12,718,116.36 12,718,116.36 12,183,694.37 29/11/2017 8 w eeks 100 Completed

3 Renov . Of 2no. Lecture Theatre and 4no. Staff Qtrs. M.S. Danzomo Nig. Ltd. Kazaure 2,491,474.26 2,491,474.26 2,491,474.23 20/12/2018 8 w eeks 100 Completed

4 Renov . Of 4no. Houses M.S. Danzomo Nig. Ltd. Kazaure 1,896,058.29 1,896,058.29 1,896,058.29 20/12/2018 8 w eeks 100 Completed

5Supply of Books Ngloma Consr. Co. Kazaure 9,371,485.34 9,371,485.34 9,371,485.34 18/04/2019 8 w eeks 100 Completed

6Supply & Installation of Solar sy stem and street light Ngloma Consr. Co. Kazaure 62,121,465.00 62,121,465.00 60,901,296.75 28/6/2019 8 w eeks 100 Completed

7 Constr 1no student Hostel on ex isting foundation Talaku Int. Serv ices Ltd. Kazaure 40,835,085.78 40,835,085.78 37,630,857.88 19/11/2018 12 w eeks 100 Completed

TOTAL 146,457,674.67 146,457,674.67

Government House

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT AMOUNT REVISED VA LUE OF C OM M EN C EM EN TC OM P L. STATUS REMARKS

(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

1 Purchase of 2No. Fa irly used vechicle Modang investment Ltd in the s tate 39,900,000.00 39,900,000.00 39,900,000.00 20/06/2019 2 weeks 100 Completed

2 Purchase of 15no. Vehicles CIG motor Company Nig Ltd in the s tate 169,533,611.20 169,533,611.20 169,533,611.20 9/12/2019 2 weeks 100 Completed

Total 209,433,611.20 209,433,611.20

Directorate of Economic Empowerment

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

1

Approval for the release of Three Hundred and Fourty

Thousand Naira (N340,000,000.00) only for the

Procurement of Fifty (50no.) tractors from JASCO for

Distribution as Empowerment loans to Farmers. JASCO Across the state 340,000,000.00 340,000,000.00 24/12/2018 3 months 100 Completed

Total 340,000,000.00 340,000,000.00

Deputy Governor Office

POST CONTRACT PROJECT EVALUATION

S/ N P R OJEC T EXEC UT OR LOC A T ION C ON T R A C T R EVISED VA LUE OF C OM M EN C EM EN T C OM P L. ST A T US R EM A R KS

A M OUN T (N ) C ON T R A C T SUM (N ) C ER T IF IED WOR K D A T E P ER IOD IN %

1

Renov ation works at Deputy Gov ernor's

Official Residence, Dutse

Daniy a Atiku

Associate Ltd. Dutse 1 7 ,1 29,21 0.40 1 7 ,1 29,21 0.40 1 7 1 21 001 .7 6 6/9/201 9 1 2 weeks 100 Completed

2

Procurement and Insta l lation of Furniture at the

Officia l Res idence of His Excel lency, the Deputy

Governor at Dutse Aimim Consult Nig. Ltd. Dutse 34,825,680.00 43,575,855.00 43575855 19/9/2019 8 weeks 100 Completed

Total 51,954,890.40 60,705,065.40

Jigawa State College of Islamic and Legal Studies Ringim

P OST C ON T R A C T P R OJEC T EVA LUA T ION

S/ N . P R OJEC T EXEC UT OR LOC A T ION CONTRACT REVISED VA LUE OF C OM M EN C EM EN TC OM P L. ST A T US R EM A R KS

AMOUNT CONTRACT SUM (N) C ER T IF IED WOR K D A T E P ER IOD IN %

1 Constr. of Library Complex (phase 1) at College of Islamic

and Legal Studies, Ringim

R & Partners Ltd. Ringim 70,000,000.00 70,000,000.00 69,998,914.36 20/10/2016 24 w eeks 100 Completed

2 Constr of Liabrary Complex (phase II) R & Partners Ltd. Ringim 47,930,224.47 47,930,224.47 47,902,467.25 27/11/2017 20 w eeks 100 Completed

3 Constr of Liabrary Complex (phase III) Back bone Global Ringim 54,024,795.20 54,024,795.20 53,963,448.21 28/12/2018 16 w eeks 100 Completed

4 Supply and Installation of 52no. Standalone street light Sims Global Ringim 32,215,050.00 32,215,050.00 32,215,050.00 15/5/2019 8 w eeks 100 Completed

Total 204,170,069.67 204,170,069.67

SECTION ( F )

ON-GOING PROJECTS

JANUARY TO DECEMBER, 2019

Ministry of Health

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

1 Constr. of New Gen. Hospital at B/Kudu Datum Constr. Limited B/kudu 1,498,970,413.02 1,894,683,085.99 1,145,153,325.12 19/5/2014 8 months 60 On-going

2

Commissioning/engagement as consultants for

the supervision of construction of new general

hospital at Birnin kudu Design Plus B/Kudu 74,010,950.99 74,010,950.99 67,484,513.49 27/5/2014 10 month 91 On-going

3

Renovation of X-Ray Block and Others at Hadejia

General Hospital

Spring Global Service Hadejia 10,771,117.36 10,771,117.36 4,502,571.15 4/2/2014 2month 43 Terminated

4

Conversion of Catering Rest House to School of

Nursing, Hadejia Business Gold Ltd. Hadejia 67,757,628.62 67,757,628.62 38,524,250.94 3/22/2016 3 months 57 Revoked

5

General Renov. /Improvement works at Fagam

Primary Health Care Ngaloma Const. Co. Ltd. Gwaram 64,869,057.07 71,417,939.66 64,370,619.95 30/12/2016 12 weeks 86 On-going

6

Constr. Of New 250 Bed Specialist Hospital in

Hadejia PHILKO LIMITED Hadejia 1,593,314,294.25 1,867,953,470.57 1,201,703,551.71 11/10/2017 18 months 64 On-going

7

Engagment as Consultant for the supervision of the

Constr. of New Specialist Hospital, Hadejia HAG Eng. Nig. Ltd. Hadejia 67,363,041.01 67,363,041.01 45,503,239.00 19/10/2017 16 months 67 On-going

8

Constr of New General Hospital at Gantsa in Buji

LGA Ngaloma Constr Ltd. Buji 465,983,075.70 465,983,075.70 383,967,848.25 12/7/2018 9 months 82 On-going

9 Constr of New General Hospital at Garki Babandoki Gen. Entp. Garki 493,805,327.06 493,805,327.06 392,405,349.52 12/7/2018 12 months 79 On-going

10

Constr of New General Hospital at Guri town,

Headquarters of Guri LGA Retro Constr Ltd. Guri 538,386,262.75 538,386,262.75 367,653,903.85 12/7/2018 12 months 68 On-going

11

Constr of New School of Nursing and Midwifery at

Babura, Headquarters of Babura LGA Gridarch Nig. Ltd. Babura 591,562,261.76 591,562,261.76 453,962,997.41 12/7/2018 12 months 77 On-going

12

Upgrading of Miga PHC to General Hospital at Miga

town, Miga LGA. Sabongarin Yaya Miga 98,226,184.67 98,226,184.67 93,527,265.11 3/9/2018 24 weeks 91 On-going

13

Engagement as Consultant for the Supervision of

the Constr. of New General Hospital, Guri AADC Limited Guri 34,870,673.74 34,870,673.74 21,968,524.45 30/8/2018 12 months 63 On-going

14

Engagement as Consultant for the Supervision of

the Constr. of New Specialist Hospital, Kazaure HAG Eng. Consultants Kazaure 78,006,110.10 78,006,110.10 51,531,977.61 10/8/2018 16 months 66 On-going

15

Engagement as Consultant for the Supervision of

the Constr. of New General Hospital, Gantsa Blue Urban Transnational Buji 33,925,256.47 33,925,256.47 20,593,195.17 10/8/2018 9 months 60 On-going

16

Engagement as Consultant for the Supervision of

the Constr. of New General Hospital, Garki Zeebro Global Resources Garki 34,321,462.71 34,321,462.71 20,670,835.53 10/8/2018 12 months 58 On-going

17 Constr. of New Specialist Hospital at Kazaure Afdin Constr Co. Ltd. Kazaure 1,893,240,056.40 1,893,240,056.40 1,003,430,526.00 5/7/2018 16 months 53 On-going

18

Supply and Installation of Medical equipments to

the newly constructed 31no. BHC across the state. Mashasha Investment Ltd.Across the state 98,065,965.00 98,065,965.00 25/4/2018 20 weeks On-going

Balance C/F 7,737,449,138.68 8,414,349,870.56

1a

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

Balance B/F 7,737,449,138.68 8,414,349,870.56

19

Co ns ultant fo r the s upervis io n o f the co ns truc tio n o f new

s cho o l o f Nurs ing and Midwifery a t Babura INTERGRAP H CONSULT Babura 50,318,699.92 50,318,699.92 35,992,089.38 24/12/2018 12 mo nths 72 On-going

20

Supply and Ins ta lla tio n o f Medica l equipments to the newly

co ns truc ted 31no . BHC acro s s the s ta te . G.M. Sara & So ns Ltd. Acro s s the s ta te 4,129,061.98 4,129,061.98 16/4/2018 6 weeks

21

Supply and Ins ta lla tio n o f Medica l equipments to the newly

co ns truc ted 31no . BHC acro s s the s ta te . Mas has ha Inves tment Ltd. Acro s s the s ta te 98,065,965.00 98,065,965.00 25/4/2018 20 weeks On-going

22

Co ns ultant fo r the s upervis io n o f the co ns truc tio n o f new

s cho o l o f Nurs ing and Midwifery a t Babura INTERGRAP H CONSULT Babura 50,318,699.92 50,318,699.92 35,992,089.38 24/12/2018 12 mo nths 72 On-going

23

Supply and Ins ta lla tio n o f Medica l equipments to the newly

co ns truc ted 31no . BHC acro s s the s ta te . G.M. Sara & So ns Ltd. Acro s s the s ta te 4,129,061.98 4,129,061.98 16/4/2018 6 weeks On-going

24

Constr o f 3no M odified Basic Health Clinics at Bagadaza,

Larkan and Dukwana in Fagam Constituency (2019

Constituency pro jects) Yayarin Tukur Nig Ltd Gwaram 25,565,018.85 25,565,018.85 24/12/2019 12 weeks On-going

25 Constr o f Basic Health Centre (BHC) at M asaya Village in Kiyawa Constituency (2nd quarter 2018 Constituency pro ject)Umar Aliyu & Sons Nig Ltd Kiyawa 11,853,799.02 11,853,799.02 6/12/2019 12 weeks On-going

26

Constr. Of 1No. Basic Health Clinic at Hangu Village in

Gwiwa Constituency pro ject 2019 M anhaf Global Constr Nig Ltd Gwiwa 19,663,090.37 19,663,090.37 27/12/2019 16 Weeks On-going

27

Supply and installation of medical equipment to the 25No.

Newly constructed basic health clinic across the state. Dangata mem. inv. Ltd Across the state 95,423,350.00 95,423,350.00 11/12/2019 8 weeks On-going

Total 8,096,915,885.72 8,773,816,617.60

1b

Ministry of Water

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

1

Rehab. of Water Supply Schemes across the state

at Gwaram Zone (Water Board) Interworld I & E Gwaram 27,207,315.85 27,207,315.85 25,403,004.38 9/21/2015 12 weeks 89 On-going

2 Constr. Of 40no. Hand pumps AGM & Sons Ltd. State 28,000,000.00 28,000,000.00 18,000,009.00 3/24/2014 6 months 65 Terminated

3

Constr. of Hand Pumps Water Supply Schemes

(phase II) as Constituency projects at Yosaro,

Dilima/Zaramba and Mungulo in B/Kudu

Constituency. A.A. Aljazeera Agro Properties B/Kudu 1,657,215.00 1,657,215.00 29/3/2017 8 weeks Stalled

4

Constsruction of Hand pumps Water supply

schemes (phase II) as constituency project at

Yola, Masanawa, Larabar Gulai, Katanga Kudu,

Dan koli and Dubal in Kiyawa Constituency. DE-MASTBO Kiyawa 3,331,430.00 3,331,430.00 29/03/2017 8 weeks Stalled

5

Construction of Solar Powered Water supply

schemes (Phase II) as constituency Projects at

Sabuwar Rafa (Andaza ward ) in Dutse

constituency DE-MASTBO Dutse 6,270,000.00 6,270,000.00 29/03/2017 8 weeks Stalled

6

Constr. Of 4no. Hand pumps Water supply

schemes (phase II) as Constituency projects at

Kofar Gidan Liman, Bayan Gidan Sarkin Bai,

Zankuwa fulani and Sabuwar SSS in Garki

Constituency. Taqib Ventures Nig. Ltd. Garki 2,340,000.00 2,340,000.00 21/6/2017 8 weeks Stalled

7

Constr. Of Solar Powered Water Supply Schemes

(Phase I) as Constituency Project at Marma in

Kirikasamma Constituency LOYALTY PROPERTIES LTD K/Kasamma 6,943,387.00 6,943,387.00 7/8/2017 8 Weeks Stalled

8

Construction of (1No.) Hand pump water supply

Schemes 2017 Constituency Project Phase II (Lot-

3) at Tsattiya in Dutse Constituency Loyalty Properties Ltd Dutse 798,000.00 798,000.00 1/24/2018 8 weeks On-going

9

Construction of 91No.) Solar Powered water

supply scheme 2017 constituency Phase II Project

(Lot-16) at Gambawa in Miga Constituency Loyalty Properties Miga 6,968,430.00 6,968,430.00 1/24/2018 8 weeks On-going

10

Constr. Of (1no.) Solar [powered water supply

scheme 2017 constituency phase II project (LOT-

27) at Gacharam in Guri Constituency. Limis Brothers & Co. Guri 6,968,430.00 6,968,430.00 24/1/2018 8 weeks On-going

11

Conversion of Motorizied Boreholes to Solar

Powered Water supply at Garki main Station in

Garki Local Govt Area. Sims Global Resources Garki 34,070,557.50 34,070,557.50 18,327,487.50 7/2/2018 12 Weeks 52 On-going

BAL. C/F 124,554,765.35 124,554,765.35

2a

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 124,554,765.35 124,554,765.35

12

Constr of (1no.) Solar Powered water supply

schemes 2017 constituency phase III projects (Lot-

13) at Kangarwa in Maigatari Constituency Jignaj Global Constr Ltd. Maigatari 6,968,430.00 6,968,430.00 21/3/2018 8 weeks On-going

13

Construction of (9No.) Hand Pumps Water supply

scheme 2017 Constituency phase II Projects (Lot-

8) at Gidan Iliyasu, Mai Goro, Falari Burburwa,

Zulkiya Kila, Kila by pass, Sara cikin gari, Kuka

manoma, Kafin torto and Fiji in Gwaram

Constituency. A.A. Aljazeera Agro Proc. Gwaram 7,202,791.35 7,202,791.35 5,588,165.61 24/1/2018 8 Weeks 74 On-going

14

Constr of (1no.) Solar Powered Water Supply

Scheme Constituency Projects (2018 phase 1) Lot-

7 at Constituency. Jignaj Global Ltd. 6,023,115.00 6,023,115.00 17/10/2018 8 weeks On-going

15

Constr of Hand pump Boreholes as constituency

projects (2018 phase III) Lot-8 at Nasarawa,

Saunawa Fulani, Kashin Ganji, Kirya, Galma,

Wailare, Rafin Kaba, Chakurawa, Timbi, Joganai,

Matsari, Fulanin Maikanbu, Buta, Makera, U/tudu,

Fulanin Dakata, G/Gashi, Malamawa Dankabo,

Danyaka fulani, JSS Garki, Sabuwar U/Arewa,

Daurawa Yamma, Gurarraji and Kuttu in Garki

Constituency. Mugin Invest. Nig. Ltd. Garki 17,703,000.00 17,703,000.00 18/12/2018 12 weeks On-going

16

Constr of Water Collection points constituency

projects (2018 phase III) Lot-22 at Gangara,

Yarbarewa, JSS Doko, Barebari, Dan Kargo, Mahoni,

Jangari, Dunguzu, Masare and Koyama in Garki

Constituency. Mugin Invest. Nig. Ltd. Garki 12,588,450.00 12,588,450.00 18/12/2018 10 weeks On-going

17

Constr of Hand pump Boreholes as constituency

projects (2018 phase II) Lot-14 at Kanzon Kokori,

D/Kyaure Yamma, Gafaya B., G.Baba Gagare D/Toca,

Aguran Mazana, Dangoli Gabas and Gafaya in Kafin

Hausa Constituency. Alkawakeb Global Concept K/Hausa 5,164,110.00 5,164,110.00 18/12/2018 8 weeks On-going

18

Constr. Of (4no.) Hand pumps water supply

Scheme Consultancy projects (2018 phase) Lot 20

at Fulanin G. Dunfu in Taura Constituency. Faahm Integrated Resource Taura 2,942,100.00 2,942,100.00 17/10/2018 6 weeks On-going

19

Construction of (1NO.) Hand Pumps Water supply

scheme Constituency projects (2018 Phase I) Lot

18 at Ban-iyaka in Roni Constituency. HikimaSynergy Gen Entp Nig Roni 733,918.50 733,918.50 17/10/2018 4 weeks On-going

BAL. C/F 183,880,680.20 183,880,680.20

2b

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 183,880,680.20 183,880,680.20

20

Construction of the (1 No.) Solar Powered Water

Supply Schemes 2018 Constituency Phase III

Projects (Lot-21) at Fagam in Fagam Constituency

Gwaram LGA. Loyalty Properties Ltd. Gwaram 6,023,010.00 6,023,010.00 23/11/2018 8 weeks On-going

21

Construction of Block of 2-Classroom Islamiyya

(1NO.) Lot-11 at Jibori in Kirikasamma

Constituency. Tosarawa Global Ltd. Kirikasamma 3,097,448.45 3,097,448.45 1/11/2018 4 Weeks On-going

22

Construction of (8NO.) Hand Pumps Water supply

scheme Constituency projects (2018 Phase I) Lot

14 at Muna, Mundu, Kwagga, Fulanin Hauwa, Jakai

Fulani, Dangaigai, Inguwar Goje and Kadagawa in

Kanya Babba Constituency. Babura Local

Government Area. DeeTech Nig Ltd. Babura 5,905,200.00 5,905,200.00 15/10/2018 8 weeks On-going

23

Construction of the (1 No.) Solar Powered Water

Supply Schemes 2018 Constituency Phase III

Projects (Lot-18) at Kaya Jamu in Maigatari

Constituency. Alkawakeb Global Concept Maigatari 6,023,115.00 6,023,115.00 23/11/2018 8 weeks On-going

24

Construction of the (1 No.) Solar Powered Water

Supply Schemes Constituency Projects (2018

Phase II) Lot-32 at Yalwa in Gagarawa

Constituency. Farham Intgratred Resources Gagarawa 6,023,115.00 6,023,115.00 23/11/2018 8 weeks On-going

25

Construction of the (1 No.) Solar Powered Water

Supply Schemes Constituency Projects (2018

Phase II) Lot-33 at Medin Saleh in Gagarawa

Constituency. Farham Intgratred Resources Gagarawa 6,022,275.00 6,022,275.00 23/11/2018 8 weeks On-going

26

Upgrading and Conversion of (30 No.) Water

Supply Schemes to Solar Powered System Across

the State (Lot-1). Sims Global Resouces Nig. across the State 240,169,437.35 240,169,437.35 184,805,303.97 14/11/2018 3 Months 77 On-going

27

Conversion of 2no. Motorized boreholes to Solar

powered water supply schemes at Babura town in

Babura LGA. SIMS Global Resources Babura 56,502,805.27 56,502,805.27 31/12/2018 12 weeks On-going

28

Construction of Water Collection Point as

Constituency Projects (2018 Phase II) Lot-32 at

Maigatari (2No.) Maloya, Bosuwa, Galadi, Madana

and Jajeri in Maigatari Constituency. Jag & H Intgrated Services Ltd. Maigatari 7,358,173.38 7,358,173.38 18/12/2018 8 weeks On-going

BAL. C/F 521,005,259.65 521,005,259.65

2c

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 521,005,259.65 521,005,259.65

29

Constr of Hand pump Boreholes as constituency

projects (2018 phase II) Lot-14 at Kanzo kokori,

D/kyaure yamma, Gafaya B, Baba Gagare D/Toca,

Aguran mazana, Dangoli Gabas and Gafaya in

K/Hausa Constituency. Alkawakeb Global Concept K/Hausa 5,164,110.00 5,164,110.00 18/12/2018 8 weeks On-going

30

Improvement of Gwaram Tsohuwa and Gwaram

Sabuwa Towns Water Supply Schemes Nushe Business Resources Gwaram 122,870,123.46 122,870,123.46 59,837,762.25 28/11/2018 6 weeks 48 On-going

31

Upgrading and Conversion of 22No. Small Towns

Water Supply Schemes to Solar Powered Water

supply Scheme (Lot-1) at Maitsamiya in Sule

Tankarkar, Sarkin gandu in Sule Tankarkar, Medu

in Gagarawa, Dankumbo in Maigatari, Giginya in

Babura,Dorawa in Babura Tasawa in Babura,

Samamiyya in Birninkudu, Bamaina in Birnin kudu,

Kantoga in Birnin kudu, Kila kudu, in Gwaram Kila

Orchad in Gwaram, Jidawa in Dutse, Aujara A. B. & C

in Jahun, Girbobo in Kaugama, Margadu in Birniwa,

Batatsaba in Guri, Tuntube in Kazaure and Sada in

Roni. Sims Global Resources State 204,765,713.15 204,765,713.15 167,257,096.65 24/12/2018 4 month 82 On-going

32

Construction of Hand Pump Boreholes Water

Supply Schemes Constituency Projects (2018

Phase III) Lot-11 at Katsiro Gidan Jaka, Mai Yadiya,

Kwarin Sanka, Gama Fulani, Unguwar Dani Fulani,

Gyauraji Alhazai, Torankayi, Makaranta Gabas

ZangonKaigamari, Kanwayi, Tsalliyawa katagum,

dangewaye, kwanjamawa, albirakyau, gidan

sansani, shafatu, gauzagidandorawa, narba kauye,

komai ALLAH yayi, ringimawa fulani, jikin kotu,

gargabo, fanfam liba, zagau fulani, gidan dan wanka,

harbo tsohuwa, harbo sabuwa, zarga, nahuce

harbo, tazara gidan gabas, gaskawa, turubu, kurfai

fulani, koya tsangayar tsoho, bagamarusabon gari,

dogawa bankin titi and jahun police station in jahun

Constituency Loyalty Properties Nig. Ltd. Jahun 28,035,640.00 28,035,640.00 18/12/2018 15 weeks On-going

BAL. C/F 881,840,846.26 881,840,846.26

2d

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 881,840,846.26 881,840,846.26

33

Construction of Hand Pump Boreholes as

Constituency Projects (2018 Phase II) Lot-13 at

Shamsul Duhu Islamiyya, Achau Makaranta,

Gwanfai Yamma, Afun funa, Akena Fulani, Gwanfai

Malamai Magama, Birjawa Fulani, AskawaGidan

makera, Alkalawa, makanin makera, kamaiAujara

gidan kaya fulani, achau barnoji, rindai dina,

unguwar tile, juniorarabicaujara, kauyen makama,

unguwar yakubu tubabe, buki tsurutawa, garawai,

sabuwar abujagabashi, yantsuru, kwarin

malam,dashi yar jigawa, kwaru nula, kadoma kagul,

kargo, fagen ganji, gurji, Alhazai bakin kasuwa

jahun, rigar larabargambadungu, lungun mai katako

and sabuwar unguwa jahun in jahun Constituency. Loyalty Properties Nig. Ltd. Jahun 27,882,120.00 27,882,120.00 18/12/2018 14 weeks On-going

34

Constr of Solar powered water supply schemes at

new market, Zai/Galadimawa and Improvement

works at Shuwarin Sabuwa and Shuwarin main

pump stations, Dutse zone. China Zhanghao Nig. Ltd. Dutse 95,232,647.00 95,232,647.00 81,979,563.75 31/12/2018 16 weeks 86 On-going

35

Upgrading and Conversion of Motorized Boreholes

to Solar Powered Water supply Scheme Sabon

Garin Takanebu Town in Miga L.G.A. of Jahun Zone. Sims Global Resources Ltd Miga 17,238,621.65 17,238,621.65 12,608,859.90 31/12/2018 8 weeks 73 On-going

36

Conversion of (15No.) Hand Pumps to Solar

Powered Water supply Schemes at Babura

Yamma, Yangadi, Zuru, Gadi, Dan Barage, Hayin

Buzu, Kuka, Gasakoli, Duzau, Yada, Kaki Zago,

Gatuta Sansami, Kankare tukurkusa and Lamba in

Babura L.G.A. Sims Global Resources Ltd Babura 15,301,125.00 15,301,125.00 31/12/2018 10 weeks On-going

37

Conversion of (12No.) Hand Pumps to Solar

Powered Water supply Schemes at Dan Amale,

Walawa, Yanmaulu, Unguwar Ma'aruf, Batali,

Kanya Gari, Dankarda, Babura Gabas, Malamawa,

Figi, Dunkumi and Duwala in Babura L.G.A. Sims Global Resources Ltd Babura 12,240,900.00 12,240,900.00 31/12/2018 10 weeks On-going

BAL. C/F 1,049,736,259.91 1,049,736,259.91

2e

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 1,049,736,259.91 1,049,736,259.91

38

Construction of Water Collection Points as

Constituency Projects (2018 Phase III) Lot-26 at

Kwanar Duniya, Kogon Bara and Jobi in Maigatari

Constituency. Danbanki Gen. Enterprises Maigatari 3,679,089.75 3,679,089.75 18/12/2018 8 weeks On-going

39

Construction of Water Collection Points as

Constituency Projects (2018 Phase II) Lot-31 at

Yelleman (2No.) Dakayyawa (2No.) and Yellaman

Tijjanai (2No.) in Kaugama Constituency. Alkawakeb Global Concept Ltd Kaugama 7,358,173.38 7,358,173.38 18/12/2018 8 weeks On-going

40

Constr of Hand Pump Boreholes Water Supply

Schemes Constituency projects (2019 First

Quarter) Lot-8 at mai dashi, Idi gwamna, unguwar

malam, rigar lamido, adiyani islamiyya, dagana

Nato, daba, dirba, rigar malam wuri, yalwa

tsangaya, goni garin una, askandi arinjasko, rigar

wakilin dajjo lafiya, rigar babare, and rigar duka

maza in Guri Constituency AYH Intg. Serv. Ltd Guri 10,331,489.00 10,331,489.00 11/12/2019 8 weeks On-going

41

Conversion of 10No hand Pump Boreholes to Solar

in at Uku da Sisi, Ajjah, Mudirin gadi, Mundu,

unguwar Ganji, Kafin Danyayi, Unguwar gawo,

Dabawa, Katirje and Tsadarwa in Babura Local

Government Area Sims Global Res Babura 10,276,880.00 10,276,880.00 8,221,500.00 11/7/2018 8 weeks 76% On-Going

42

Construction of 1No. Solar Powered Water Supply

Scheme at Dora in Garki LGA Ringim Zone Sims Global Resources Ringim 6,023,325.00 6,023,325.00 16/4/2019 8 Weeks On-going

43

Construction of 6No Hand Pump Boreholes water

supply scheme at Yandamo Kulle 2, umarni,

Modoji Babba, Fulanin Riggade, Gidan Hardo Musa

( Fulanin Asayaya) in Sule Tankarkar Local

Government Area and Tamburawa in Kafin Hausa

LGA K-Manu Gen Construction

S/tankarkar +

K/Hausa 4,427,640.00 4,427,640.00 3,680,475.75 8/5/2019 12 weeks 83 On-going

44

Upgrading and Conversion of 1no. Motorised

water supply scheme to Solar power at UKU da SISI

Sabuwa in Babura LGA Sims Nig. Ltd. Babura 6,767,532.45 6,767,532.45 27/9/2019 8 weeks On-going

45

Rehab. of 13no. Water supply scheme at Ringim,

Kazaure and Gumel LGA Sims Nig. Ltd. Gumel 12,788,475.00 12,788,475.00 27/9/2019 8 weeks On-going

BAL. C/F 1,111,388,864.49 1,111,388,864.49

2f

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 1,111,388,864.49 1,111,388,864.49

46

Constr of (1no.) New Solar powered water supply

scheme at YAN Maulu Tsohuwa in Babura LGA Sims Nig. Ltd. Babura 6,023,325.00 6,023,325.00 27/9/2019 8 weeks On-going

47

Upgrading and Conversion of 1no. Motorised

water supply scheme to Solar powered atJigawar

Dan Ali, Garun Gudunya in Babura LGA and JEKE in

S/Tankarkar LGA Sims Nig. Ltd. S/Tankarkar 18,459,647.97 18,459,647.97 11/10/2019 8 weeks On-going

48 Rehab. Of 19no. Water supply schemein Ringim Sims Nig. Ltd. Ringim 17,361,750.00 17,361,750.00 11/10/2019 8 weeks On-going

49

Constr of Hand Pump Boreholes Water Supply

Schemes Constituency projects (2019 First

Quarter) Lot-1 at Fulanin Gamba, Fulanin Garu and

Fulanin Kafur in Auyo Contituency. AMM Manzo Nig Ltd Auyo 2,210,922.00 2,210,922.00 11/12/2019 8 weeks On-going

50

Constr of Hand Pump Boreholes Water Supply

Schemes Constituency projects (2019 First

Quarter) Lot-26 atKankanba, Dodorin Tudu, Hardo

Magaji, Mataran, Dalarin Kwalta, Bultuwa Rigar

Gabas, Dodorin Rigar Mal Yakubu, Bultuwa Rigar

Kauga, Ung. Jibrin Masallacin Mal. Kawu and Rigar

Dado Gajere In Kaugama Contituency. AMM Manzo Nig Ltd Kaugama 7,377,510.00 7,377,510.00 - 11/12/2019 8 weeks On-going

51

Constr of Solar Powered water Supply schemes

Contituency project ( 2019 Phase 1) Lot- 46 at

Garin Urema in Hadejia Constituency A+Tech Integrated Nig. Ltd Hadejia 6,021,855.00 6,021,855.00 11/12/2019 8 weeks On-going

52

Constr of Solar Powered water Supply schemes

Contituency project ( 2019 Phase 1) Lot- 45 at

Gawon Dogari in Hadejia Constituency Amia Integrated Service Nig Ltd Hadejia 6,022,485.00 6,022,485.00 11/12/2019 8 weeks On-going

53

Constr of Solar Powered water Supply schemes

Contituency project ( 2019 Phase 1) Lot- 39

atSabon Gari in Miga Constituency Amia Integrated Service Nig Ltd Miga 6,022,485.00 6,022,485.00 11/12/2019 8 weeks On-going

54

Constr of Solar Powered water Supply schemes

Contituency project ( 2019 Phase 1) Lot- 40 at

Gidan Barwa in Miga Constituency A. Barde Global Concept Ltd Miga 6,023,010.00 6,023,010.00 11/12/2019 8 weeks On-going

55

Constr of Solar Powered water Supply schemes

Contituency project ( 2019 Phase 1) Lot- 4 at Juba

Gandu in Auyo Constituency Alh. Umaru Baban Doki Nig Ltd Auyo 6,004,715.00 6,004,715.00 11/12/2019 8 weeks On-going

BAL. C/F 1,192,916,569.46 1,192,916,569.46

2g

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 1,192,916,569.46 1,192,916,569.46

56

Constr of Solar Powered water Supply schemes

Contituency project ( 2019 Phase 1) Lot- 39 at

Gabari in Malam Madori Constituency Prestige Integ Serv. Nig Ltd M/Madori 6,022,695.00 6,022,695.00 11/12/2019 8 weeks On-going

57

Constr of Water Collection Point 2019 First

Quarter Constituency Project (Lot-..) at Yofai,

Tuyau, Gidan Kara, Dagasa, Jiyau, Fulani, Jiyau

Babba, Tagwai, Kun Kurawa, Danbaje, Auramo

Gabas Zangon Sallau, Dan Tsiru, Tsurutawa,

Auramo Tudu, Gidan Sani, Zabara, Durno, Kuna,

Dara Zai and Bangon Jani in Ringim Constituency. Prestige Integ Serv. Nig Ltd Ringim 25,206,980.00 25,206,980.00 11/12/2019 8 weeks On-going

58

Constr of Solar Powered water Supply schemes

Contituency project ( 2019 Phase 1) Lot- 3 at

Sabuwar Auyo in Auyo Constituency A.A Aljazeera Agro Processing Nig Ltd Auyo 6,010,515.00 6,010,515.00 23/12/2019 8 weeks On-going

59

Constr of Hand Pump Boreholes Water Supply

Schemes Constituency projects (2019 First

Quarter) Lot-28 at Tashar Yellow, Fulani Cakindi,

Turkushawa Gari, Gidan Amadu Inge, Fulanin

Kaina, G. Idi Shiba, Fulanin Hammado, Gidan

Dibbo in Sule Tankarkar Contituency. A.A Aljazeera Agro Processing Nig LtdS/Tankarkar 4,426,695.00 4,426,695.00 11/12/2019 8 weeks On-going

60

Constr of Hand Pump Boreholes Water Supply

Schemes Constituency projects (2019 First

Quarter) Lot-29 at Gangawa, Sabara, Ruwan

Dawa, Kulleran, Gangawa Fulani, Fanisau, Tazara

Sabon Gida, Tula, Majiga Harbo, Dina, Kamai

Gitsiri, Dogawa, Gabashi, Bayan Kotun cikin Gari,

Gundin Sabon Gida and Yammawa in Jahun

Contituency. Sasco Multi Serv Nig Ltd Jahun 11,791,752.00 11,791,752.00 11/12/2019 14 weeks On-going

61

Constr of Water Collection Point 2019 First

Quarter Constituency Project Lot- 19 at Kofar

Kudu Basirka, kofar Yamma Basirka Dal and Kofar

Tela Basirka in Fagam Constituency, Gwaram LGA Jignaj Global Contr Ltd Gwaram 4,876,422.00 4,876,422.00 11/12/2019 8 weeks On-going

62

Renov of 2no. Solar Powered water Supply

schemes Contituency project ( 2019 Phase 1) Lot-

24 at Gidan Kudege and Kurneji in Gwiwa

Constituency Jignaj Global Contr Ltd Gwiwa 3,227,700.00 3,227,700.00 11/12/2019 8 weeks On-going

63

Constr of Water Collection Point 2019 First

aquarter Constituency Project Lot- 23 at Kauyen

Zarga and Rigarsu Iro Akwai Allah In Taura

Constituency Nushe Bus, Resources Nig Ltd Taura 2,519,647.20 2,519,647.20 11/12/2019 8 weeks On-going

BAL. C/F 1,256,998,975.66 1,256,998,975.66

2h

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 1,256,998,975.66 1,256,998,975.66

64

Constr of Gwaram Tsohuwa and Gwaram Sabuwa

Towns Water Supply Scheme (Additionsl Works) Nushe Bus, Resources Nig Ltd Gwaram 29,520,524.45 29,520,524.45 11/12/2019 12 weeks On-going

65

Constr of Hand Pump Boreholes Water Supply

Schemes Constituency projects (2019 First

Quarter) Lot-12 at Sabuwar Jawo (sabaru ward),

fulanin Ballami (Dandi ward), K/mal. Ali

Headmaster (Gada ward), K/Alto Makeri (Gada

ward) and Makabarat Gabas ( Gada ward) in

Kazaure Contituency. Yanduna Venture Nig Ltd Kazaure 3,686,287.50 3,686,287.50 11/12/2019 8 weeks On-going

66

Constr of Solar Powered Water Supply Scheme

Constituecy project (2019 Phase 1) Lot-8 at

Tsohuwar Fitare in Kazaure Constituency Yanduna Venture Nig Ltd Kazaure 6,023,115.00 6,023,115.00 11/12/2019 8 weeks On-going

67

Constr of Solar Powered Water Supply Scheme

Constituecy project (2019 Phase 1) Lot-7 at

Wawan Rafi in Kazaure Constituency Yanduna Venture Nig Ltd Kazaure 6,023,115.00 6,023,115.00 11/12/2019 8 weeks On-going

68

Constr of Hand Pump Boreholes Water Supply

Schemes Constituency projects (2019 First

Quarter) Lot-14 at Tuda, Zakirai, K/gidan Mal Mai

unguwa, Gidan Dachi, Majiyawa, Gangare, Jigawar

Kaba, Mazazzaga, Yammachi, Fake cikin Gari,

Kabobi, Haddori, Jama'ar isah Yaldewa/Gumai,

Malamawa, Zakoro, Tasha, Jama;ar Dawa Fulani,

Unguwar Abdullahi Mati, Jigawar Tsaba and

Makarantar Andaza in Kiyawa Contituency. Tosarawa Global Nig Ltd 14,739,900.00 14,739,900.00 11/12/2019 12 weeks On-going

69

Constr of Water Collection Point 2019 First

Quarter Constituency Project (Lot-21) at Fake Cikin

Gari, Kalali, Katuka Cikin Gari, Garko Cikin Gari,

Shuwarin Cikin Gari, Turho, Tsurma cikin Gari,

Kadara Dankargo and Dangoli in Kiyawa

Constituency. Tosarawa Global Nig Ltd Kiyawa 12,603,490.00 12,603,490.00 11/12/2019 8 weeks On-going

70

Constr of Solar Powered Water Supply Scheme

Constituecy project (2019 Phase 1) Lot-2 at Kafeje

in Auyo Constituency AMM Manzo Nig Ltd Auyo 6,004,215.00 6,004,215.00 11/12/2019 8 weeks On-going

71

Constr of Solar Powered Water Supply Scheme

Constituecy project (2019 Phase 1) Lot-19 at Ruwa

yakaika in Gwiwa Constituency Jignaj Global Contr Ltd Gwiwa 6,023,220.00 6,023,220.00 11/12/2019 8 weeks On-going

BAL. C/F 1,341,622,842.61 1,341,622,842.61

2i

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 1,341,622,842.61 1,341,622,842.61

72

Constr of Solar Powered Water Supply Scheme

Constituecy project (2019 Phase 1) Lot-20 at yola

Kauye in Gwiwa Constituency Jignaj Global Contr Ltd Gwiwa 6,023,220.00 6,023,220.00 11/12/2019 8 weeks On-going

73

Constr of Hand Pump Boreholes Water Supply

Schemes Constituency projects (2019 First

Quarter) Lot-17 at yankwashi fulani, rauda gabas

and dumbule in yankwashi constituency. Granitoids Engr Services YanKwashi 2,213,032.00 2,213,032.00 11/12/2019 8 weeks On-going

74

Constr of Solar Powered Water Supply Scheme

Constituecy project (2019 Phase 1) Lot-34 at

addani in yankwashi Constituency Granitoids Engr Services YanKwashi 6,022,590.00 6,022,590.00 11/12/2019 8 weeks On-going

75

Constr of Solar Powered Water Supply Scheme

Constituecy project (2019 Phase 1) Lot-33 at

karkarna in yankwashi Constituency Granitoids Engr Services YanKwashi 6,022,590.00 6,022,590.00 11/12/2019 8 weeks On-going

76

Constr. of Solar Powered Water Supply Scheme

Constituecy project (2019 Phase 1) Lot-35 at

manomi in Malammadori Constituency Step by Step Int. Ser. Ltd M/madori 6,022,905.00 6,022,905.00 23/12/2019 8 weeks On-going

77

Constr of Solar Powered Water Supply Scheme

Constituecy project (2019 Phase 1) Lot-37 at

Surakin in Malammadori Constituency Step by Step Int. Ser. Ltd M/Madori 6,022,905.00 6,022,905.00 23/12/2019 8 weeks On-going

78

Constr. of Solar Powered Water Supply Scheme

Constituecy project (2019 Phase 1) Lot-9 at munar

yan biyu in Kanya Constituency, Babura LGA. Deetech Nig. Ltd Babura 6,010,935.00 6,010,935.00 23/12/2019 8 weeks On-going

79

Constr. of Solar Powered Water Supply Scheme

Constituecy project (2019 Phase 1) Lot-30

atkukule in Gagarawa Constituency Farham Synergy Ltd Gagarawa 6,022,800.00 6,022,800.00 23/12/2019 8 weeks On-going

80

Construction of hand pump boreholes water

supply schemes constituency projects (2019 first

quarter) Lot-10 at K/hausa gen. Hospital, bayan

reformatory school, alakalawa A, alakalawa B,

Makarantar allo kudu K/hausa, makarantar

D/jalla, Makarantar M. sa'adu, makarantar

turkawa, makarantar asharan chiroma, filin idi

K/hausa, makarantar su shamsu, dawasa, yan

darman shukura, fulanin toyara, kashe badi,

chiroma kwakwata, kutungun, aguran kwari,

usman kukoki, tagadawai, abewa, kazuba, karfa

kama, rigar kanawa, kazalewa UNG, sule M. tubka,

kununu, lafiya, katanga, rigar D/iya, kijinawa M.

sa'adu, marwa abdullawa, zilawa abdullawa,

aragada abdullawa, kanzan fulani (mai jama'a

jingi), kargumaka (jema haruna), karori, fulanin

baushe, mamajo, fulanin rumfa and baushe gari in

K/Hausa constituency. Mugin Inv. Nig. Ltd K/Hausa 29,509,200.00 29,509,200.00 11/12/2019 16 Weeks On-going

BAL. C/F 1,415,493,019.61 1,415,493,019.61

2j

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 1,415,493,019.61 1,415,493,019.61

81

Constr. of 1NO. Solar Powered Water Supply

Scheme Constituecy project (2019 Phase 1) Lot-31

Mutumbi in Gagarawa Constituency Farham Synergy Ltd Gagarawa 6,022,800.00 6,022,800.00 23/12/2019 8 weeks On-going

82

Consrt of 1NO. Solar Powered Water Supply

Scheme Constituecy project (2019 Phase 1) Lot-10

at Kanya cikin gari in Kanya Constituency, Babura

LGA. Deetech Nig. Ltd Babura 6,010,935.00 6,010,935.00 23/12/2019 8 weeks On-going

83

Drilling of borehole and construction of overhead

tank at fire service directorate headquaters in

Dutse (2019 capital project) Al-juraj synergy concept Ltd Dutse 6,734,650.13 6,734,650.13 18/12/2019 8 weeks On-going

84

Rehabilitation of 3no. Water supply scheme at

danzomo, maitsamiya, and dankumbo in sule

tankarkar (gumel zone 2019) Lot-2 capital projects LIMIS Brothers & Co S/Tankarkar 4,628,531.25 4,628,531.25 19/12/2019 4 weeks On-going

85

Construction of hand pump boreholes water

supply schemes constituency projects (2019 first

quarter) Lot-27 at jalomin kudu, malari, zaburan,

Ung/tsamiya, kundu, marke ung gabas, Dunbari,

chuguliski, rigar ya'u karami, dolon malam and

arbus ung. Mamman in kaugama constituency Mufabamex Concept Ltd Kaugama 7,376,800.00 7,376,800.00 11/12/2019 8 Weeks On-going

86

Construction of hand pump boreholes water

supply schemes constituency projects (2019 first

quarter) Lot-30 at koluma, kodau, kata kata,

kayoyi, turakan fulani, gidan jauro, jalingo S/sara,

Baba ari, tsangayar gabas, malumawa, karalbali

iguda, gobararin fulani, fulanin kira karama, rugar

babayo, gamayin yamma, kayoyi jabo, tafa, jabo

gabas, makerawa H/ali and rugar amadu babai in

bulangu costituency yusmatech inv. Nig. Ltd K/Hausa 14,754,800.00 14,754,800.00 11/12/2019 14 Weeks On-going

87

Construction of pipeline distribution network

(28.6km) in Kazaure Town Lot-1 CGC Nigeria Ltd Kazaure 529,952,482.00 529,952,482.00 23/12/2019 24 weeks On-going

88

Constr of 1NO. Solar Powered Water Supply

Scheme Constituecy project (2019 Phase 1) Lot-97

at Basirka JIBWIS Jumu'at Mosque in fagam

Constituency Lines dimensions Nig Ltd Gwaram 3,640,350.00 3,640,350.00 17/12/2019 8 weeks On-going

89

Consr rof 1NO. Solar Powered Water Supply

Scheme Lot-7 at Daki daka in Garki LGA (Ringim

zone 2019)-capital project LIMIS Brothers & Co Ringim 6,019,125.00 6,019,125.00 19/12/2019 8 weeks On-going

BAL. C/F 2,000,633,492.99 2,000,633,492.99

2k

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 2,000,633,492.99 2,000,633,492.99

90

Constr of 1NO. Solar Powered Water Supply

Scheme Lot-8 at Kunyafa in Babura LGA (Ringim

zone 2019)-capital projects LIMIS Brothers & Co Ringim 6,019,125.00 6,019,125.00 19/12/2019 8 weeks On-going

91

Constr of 1NO. Solar Powered Water Supply

Scheme Constituecy project (2019 Phase 1) Lot-1

at Kafardu in auyo Constituency Faahm Integrated Ltd Auyo 6,018,915.00 6,018,915.00 23/12/2019 8 weeks On-going

92

Construction of hand pump boreholes water

supply schemes constituency projects (2019 first

quarter) Lot-5 at Maibarewa, Sabalari, K/Fulani

and Kadusawa in Dutse constituency Farham synergy con. Ltd Dutse 2,947,896.00 2,947,896.00 11/12/2019 8 weeks On-going

93

Construction of water collection points 2019 first

querter constituency projects Lot-18 at kadiran,

fagi, karanga and karde in birniwa constituency Dabino integ serv Ltd Birniwa 5,050,128.00 5,050,128.00 14/12/2019 12 weeks On-going

94

Constr of 1NO. Solar Powered Water Supply

Scheme Constituecy project (2019 Phase 1) Lot-44

at alkalawa in K/hausa Constituency Hambiscons Nig Ltd K/hausa 6,016,920.00 6,016,920.00 23/12/2019 8 weeks On-going

95

Constr of 1NO. Solar Powered Water Supply

Scheme Constituecy project (2019 Phase 1) Lot-43

at Kore in K/hausa Constituency Hambiscons Nig Ltd K/Hausa 6,016,920.00 6,016,920.00 23/12/2019 8 weeks On-going

96

Construction of hand pump boreholes water

supply schemes constituency projects (2019 first

quarter) Lot-3 at kazura, rugar taho, fulanin

karanga, fulanin karanga gabas, fulanin fagi, rugar

saga, fulanin diginsa, Gidan Mal Dahiru, Birniwa

U/yamma, rugar idi kulla, rugar haberi, mara,

diginsa, fulanin batu, Umaru mai goro, fulanin mai

zariya, korewa, fulanin kachallari, dargazawa,

fulanin kishinde, gidan amadu, fulanin kazadama

and inkibulawa gabas in birniwa constituency Dabino integ serv Ltd Kaugama 15,492,109.50 15,492,109.50 14/12/2019 12 weeks On-going

97

Constr of 1NO. Solar Powered Water Supply

Scheme Constituecy project (2019 Phase 1) Lot-38

at gari uku in malam madori Constituency Hambiscons Nig Ltd M/madori 6,016,920.00 6,016,920.00 23/12/2019 8 weeks On-going

98

Constr of 1NO. Solar Powered Water Supply

Scheme Constituecy project (2019 Phase 1) Lot-18

at garin tudu in maigatari Constituency Hambiscons Nig Ltd Maigatari 6,016,920.00 6,016,920.00 23/12/2019 8 weeks On-going

99

Constr of 1NO. Solar Powered Water Supply

Scheme Constituecy project (2019 Phase 1) Lot-17

at kwaduge in maigatari Constituency Hambiscons Nig Ltd Maigatari 6,016,920.00 6,016,920.00 23/12/2019 8 weeks On-going

100

Rehabilitation of 18No. Water supply Schemes

Across the state. LIMIS Brothers & Co Across the state 9,748,615.80 9,748,615.80 24/12/2191 8 weeks On-going

BAL. C/F 2,075,994,882.29 2,075,994,882.29

2l

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 2,075,994,882.29 2,075,994,882.29

101

Constr of Soler Power supply Scheme Constituecy

project (2019 Phase I) Lot-32 at Ganbabituwa in

Kirikasamma Constituency. Dabino integ serv Ltd K/Kasamma 6,017,235.00 6,017,235.00 11/12/2019 8 weeks On-going

102

Constr of Hand Pump Boreholes Water Supply

Schemes Constituency projects (2019 First

Quarter) Lot-13 at Sawon Yamma, Gishingawa

2no., Rigar kaiwari, Iyo, Tage, Garin Wakili

Gilakochini, Barmaguwa 2no. Fandun Fulani, Gayin

Gane, Lofanga, Daladige, Babba Kamaji and

Marawaji in Kirikasamma Constituency Dabino Integ Serv. Ltd K/Kasamma 11,792,080.00 11,792,080.00 11/12/2019 12 weeks On-going

103

Construction of solar power water supply scheme

constituncy project (2019 phase I) Lot-32 at

Ganbabituwa in kirikasamma constituency. Dabino Integ Serv. Ltd K/Kasamma 6,017,235.00 6,017,235.00 11/12/2019 8 weeks On-going

104

Construction of hand pump boreholes water

supply schemes constituency projects (2019 first

quarter) Lot-15 at Sabon Sara, Jigalari, Lumu and

Gidan Maza in Miga constituency A. Barde Global Concopt Ltd Miga 2,948,820.00 2,948,820.00 11/12/2019 8 weeks On-going

105

Constr of Hand Pump Boreholes Water Supply

Schemes Constituency projects (2019 First

Quarter) Lot-2 at Kaute , Waje, Gurfai, Gangara,

Kurta Fulani G. M/Jadi and Indurkuba Fulani Arewa

in Babura Constituency Mufabamex Concept Ltd Babura 3,687,075.00 3,687,075.00 11/12/2019 12 weeks On-going

106

Constr.of Solar Powered Water Supply Scheme

Constituency Project (2019 phase 1) Lot-29 at

Wadda in Gagarawa Constituency Farham Synergy con. Ltd Gagarawa 6,022,800.00 6,022,800.00 11/12/2019 8 weeks On-going

107

Constr of Hand Pump Boreholes Water Supply

Schemes Constituency projects (2019 First

Quarter) Lot-6 at Kwalam Fulani, Maidu Tsokai,

Makwai Fulani, Gidan Haruna Dan Daga, Sarkin

Dare Kofar Shafi'I, Sarkin Dare Fulani, M. Na'annabi

Fulani, Garin Dutse Fulani Tale, Wadi Fulani and

Gidan Alasan Nadidi in Gagarawa Constituency JAG&H integrated services ltd Gagarawa 7,379,940.00 7,379,940.00 11/12/2019 8 weeks On-going

108

Constr. of Solar Powered Water Supply Scheme

Constituency Project (2019 PHASE 1) LOT-15 At

Dawar Gada in Maigatari Constituency A.S.Maifata Gen. EntP. Ltd Maigatari 6,015,765.00 6,015,765.00 11/12/2019 8 weeks On-going

109

Constr. of Solar Powered Water Supply Scheme

Constituency Project (2019 PHASE 1) LOT-14 At

Zuba Barkono in Guri Constituency A.Y.H Invest. Co. Nig. LTD. Guri 6,014,715.00 6,014,715.00 11/12/2019 8 weeks On-going

110

Constr.of Solar Powered Water Supply Scheme

Constituency Project (2019 PHASE 1) LOT-12 At

Madamuwa in Guri Constituency A.Y.H Invest. Co. Nig. LTD. Guri 6,014,715.00 6,014,715.00 11/12/2019 8 weeks On-going

BAL. C/F 2,137,905,262.29 2,137,905,262.29

2m

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 2,137,905,262.29 2,137,905,262.29

111

Constr of Solar Powered Water Supply Scheme

Constituency Project (2019 phase 1) Lot-11 at

Unguwar Gabas in Guri Constituency. A.Y.H Invest. Co. Nig. LTD. Guri 6,014,715.00 6,014,715.00 11/12/2019 8 weeks On-going

112

Constr of Solar Powered Water Supply Scheme

Constituency Project (2019 phase 1) Lot-5

atGeneral Hospital in Birniwa Constituency. A.S.Maifata Gen. EntP. Ltd Birniwa 6,015,765.00 6,015,765.00 11/12/2019 8 weeks On-going

113

Constr of Solar Powered Water Supply Scheme

Constituency Project (2019 phase 1) Lot-6 at

Kazura in Birniwa Constituency. A.S.Maifata Gen. EntP. Ltd Guri 6,015,765.00 6,015,765.00 11/12/2019 8 weeks On-going

114

Constr of Solar Powered Water Supply Scheme

Constituency Project (2019 phase 1) Lot-13 at

Bodala in Guri Constituency. A.Y.H Invest. Co. Nig. LTD. Guri 6,014,715.00 6,014,715.00 11/12/2019 8 weeks On-going

115

Conversion of Motorized Water Supply Scheme to

Solar Powered and Rehabilitation of Existing Solar

Schemes at College of Education Gumel SIMS Global Resources Gumel 29,243,441.00 29,243,441.00 6/12/2019 8 weeks On-going

116

Constr. of Solar Powered Water Supply Scheme

Constituency Project (2019 PHASE 1) LOT-47 At

maruta in Gwaram Constituency farham synergy con. Ltd Gwaram 6,022,800.00 6,022,801.00 11/12/2019 8 Weeks On-going

117

Constr. of Solar Powered Water Supply Scheme

Constituency Project (2019 PHASE 1) LOT-25 At

Fagoji in Dutse Constituency JAG & H Interg. Service Dutse 6,021,015.00 6,021,015.00 11/12/2019 8 Weeks On-going

118

Constr. Of watar collection point 2019 first quarter

constituency project Lot 20 at zazzana, mida, and

lafiya in gwaram constutuency farham synergy con. Ltd Gwaram 3,758,997.00 3,758,997.00 11/12/2019 8 weeks On-going

119

Constr. of Solar Powered Water Supply Scheme

Constituency Project (2019 PHASE I) LOT-26 At

Kulasa in Dutse Constituency JAG & H Interg. Service Dutse 6,021,015.00 6,021,015.00 11/12/2019 8 Weeks On-going

120

Constr. of Solar Powered Water Supply Scheme

Constituency Project (2019 PHASE I) LOT-27 At

Kwaimawa in Dutse Constituency JAG & H Intergreted Service Dutse 6,021,015.00 6,021,015.00 11/12/2019 8 Weeks On-going

121

Constr. of Solar Powered Water Supply Scheme

Constituency Project (2019 PHASE I) LOT-28 At

Tabobo in Dutse Constituency JAG & H Intergreted Service Dutse 6,021,015.00 6,021,015.00 11/12/2019 8 Weeks On-going

122

Constr of Hand Pump Boreholes Water Supply

Schemes Constituency projects (2019 First

Quarter) Lot-29 at gangawa, sabara, ruwan dawa,

kulleran, ganwa fulani, fanisau, tazara sabon gida,

tula, majiga, harbo, dina, kamai gitsira, dogawa

gabashi, bayan kotun cikin gari, gundin sabon gida

and yamma in Jahun Constituency Sasco Multi Serv Nig Ltd Jahun 11,791,752.00 11,791,752.00 11/12/2019 14 Weeks On-going

BAL. C/F 2,236,867,272.29 2,236,867,273.29

2n

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 2,236,867,272.29 2,236,867,273.29

123

Constr of Hand Pump Boreholes Water Supply

Schemes Constituency projects (2019 First

Quarter) Lot-12 at sabuwar jawo (sabaru ward),

fulanin ballami (dandi ward), K/Mal. Ali

headmaster (gada ward), K/alta makeri (gada

ward) and makabarta gabas (gada ward) in

kazaure Constituency Yanduna Venture Nig Ltd Kazaure 3,686,287.50 3,686,287.50 11/11/2019 8 Weeks On-going

124

Constr of 5No. Hand Pumps Boreholes Water

Supply Schemes Constituency projects (2019 First

Quarter) Lot-25 at kanya abbba, dan yayin

daurawa, kagadama, walawa and shantake in

kanya babba Constituency Deetech Nig. Ltd Babura 5,100,375.00 5,100,375.00 11/12/2019 8 weeks On-going

TOTAL 2,245,653,934.79 2,245,653,935.79

Ministry of Works

P OST C ON T R A C T P R OJEC T EVA LUA T ION

S/ N . P R OJEC T EXEC UT OR LOC A T ION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. ST A T US R EM A R KS

AMOUNT CONTRACT SUM (N) C ER T IF IED WOR K D A T E P ER IOD IN %

1

Consultancy serv ices for the Constr. of Limaw a-Warw ade-Jidaw a-

Sakw ay a-Dutse road KAP Civ il Eng. Consultants Dutse 57,547,589.11 57,547,589.11 51,132,963.56 11/15/2012 16 months 94 Stalled

2 Constr. of Limaw a-Warw ade-Jidaw a-Sakw ay a-Dutse road (33.40km) Boroni Prono & Co. Ltd. Dutse 2,968,551,896.02 2,968,551,896.02 2,611,339,802.95 2/11/2012 14 months 88 Stalled

3

Commissioning as Consultant on the superv ision of the Urban Tow n

Streetlight Project at Garki, Karkarna, Bamaina and 3no. Gen. Hosp. MBS Eng. Nig. Ltd. Garki 29,431,500.00 29,431,500.00 27,371,295.00 23/4/2014 93 stalled

4 Consultancy serv ices for the constr. Of T/kance-jamus feeder road UKM Civ il Eng. Consultant Babura 21,657,808.87 21,657,808.87 21,657,808.87 2/8/2014 8 Months 60 On-going

5

Commisioning as consultant on the superv ision of the construction of 6No.

New feeder road projects across the state OPIQ Consultant Ringim 22,400,354.68 22,600,354.68 21,242,736.09 28/5/2014 8 months 95 On-going

6 Consultancy Superv ision for the Constr. of Gw iw a tow nship roads (4.0km) Sadiq Eng. Serv ices Gw iw a 34,489,165.99 34,489,165.99 31,495,251.31 12/17/2012 6 months 95 Stalled

7 Construction of Tow nship at kaugama Urban Centre (6.30KM) Rocad Contr. LTD Kaugama 940,127,208.47 940,127,208.47 263,578,988.93 13/12/2013 8 Months 28 Rev oked

8 Constr. of Tow nship Roads at Hadejia Urban Centre (12.80KM) Paache Const. Nig. LTD Hadejia 2,507,773,876.62 2,997,892,256.00 2,596,781,916.87 12/31/2013 12 months 87 On-going

9 Constr. of Tow nship Roads at Maigatari Urban Centre (6.95KM) H&M Nig. LTD Maigatari 1,037,700,121.50 1,037,700,121.50 866,698,245.00 17/12/2013 8 Months 83 On-going

10 Constr. of Tow nship Roads at Guri Urban Centre (6.15KM) SKY Tech.& Contr.LTD Guri 1,362,774,826.33 1,362,774,826.33 1,266,547,203.54 17/12/2013 8 Months 93 On-going

11

Commissioning as Consultant on the Superv ision of the Constr. of Maigatari

Tow nship Road (6.95KM) Sadiq Eng Ser. LTD Maigatari 64,472,315.43 64,472,315.43 58,918,158.83 19/12/2013 8 Months 90 On-going

12

Commissioning as Consultant on the Superv ision of the Constr. of M/Madori

tow nship Road (6.40KM) U.K.M Civ il Eng. LTD M/madori 59,544,758.06 59,544,758.06 58,052,780.58 12/31/2013 8 Months 100 On-going

13

Commissioning as Consultant on the Constr. Of Roni tow nship roads

(5.00KM) EMACS Eng. Consultants Roni 61,195,703.35 61,195,703.35 57,626,153.48 12/31/2013 8 Months 94 On-going

14 Commissioning as Consultant for the Constr. of Hadejia Tow nship roads Global Ecological Hadejia 101,482,637.11 101,482,637.11 89,435,668.10 12/31/2013 16 months 88 On-going

15 Commissioning as Consultant for the Constr. of Kaugama Tow nship roads Interactiv e Consultants Kaugama 66,347,751.06 66,347,751.06 38,946,478.35 12/31/2013 12 months 58 Revoked

16 Commissioning as Consultant for the Constr. of Guri Tow nship roads Madapad Eng. Ltd. Guri 66,500,604.95 66,500,604.95 58,742,130.61 12/3/2013 12 months 88 On-going

17

Fabrication and Erection of roads directional signs (Gantry ) and street

naming w ithin DutseMunicipality Durability Eng. Serv ices Dutse 90,081,840.00 90,081,840.00 77,618,236.51 18/3/2014 12 w eeks 87 Stalled

18 Construction of Gw iw a tow nship roads (4.0km) H & M Nig. Ltd. Gw iw a 509,414,865.75 509,414,865.75 412,393,839.50 29/11/2012 6 months 88 Stalled

19 Re-Constr. of Roni Tow nship road (5.00km) Alren Constr. Co. Ltd. Roni 645,608,565.02 645,608,565.02 645,579,156.97 4/4/2016 8 months 100 On-going

Balance C/F 10,647,103,388.32 11,137,421,767.70

3a

P OST C ON T R A C T P R OJEC T EVA LUA T ION

S/ N . P R OJEC T EXEC UT OR LOC A T ION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. ST A T US R EM A R KS

AMOUNT CONTRACT SUM (N) C ER T IF IED WOR K D A T E P ER IOD IN %

Balance B/F 10,647,103,388.32 11,137,421,767.70

20 Re-Constr. of Kazaure Tow nship road (14.643km) Soject Nig. Ltd. Kazaure 2,090,736,236.34 2,090,736,236.34 2,090,610,656.20 4/4/2016 8 months 100 On-going

21

Constr. of Jigaw ar Dan Ali-Maitsamiy a-S/tankarkar-Dangw anki-Dankumbo

Feeder road w ith Sur from Dankumbo to Matsatsagi (45km) H & M Nig. Ltd. S/tankarkar 639,156,955.50 1,003,554,571.95 943,572,613.20 28/12/2016 9 months 95 On-going

22

Constr. of Majingini-Maimazari-Dantuw o -Hannun Giw a-Dankumbo feeder

road (11.5km) H & M Nig. Ltd. S/tankarkar 188,786,408.33 188,786,408.33 174,762,675.02 28/12/2016 6 months 75 On-going

23

Consultant for valuation of the State Govt.'s Investment in Electricity

Distribution network (PHCN) Emirate Consulting Ltd. State 125,000,000.00 125,000,000.00 62,500,000.00 19/6/2013 12 months 50 Stalled

24 Electrification of Shakoto-Bulangu (REB) Aima Strong Store Ltd. K/hausa 36,199,059.19 36,199,059.19 29,923,001.66 2/19/2014 6 months 89 On-going

25

Supervision of the construction of JigawarDan-ali-Maitsamiya-

Suletankarkar-Dangwanki-Dankumbo to Matsatsagi (45KM) and

construction of Kudai-Ruru-Dantawuya-Sakwaya Feeder Road

(15KM) UKM Civil Eng.

S/tankarkar +

Dutse 14,172,571.35 14,172,571.35 10,066,755.99 11/4/2017 12 months 71 On-going

26 Constr of Darai-Gilima road (9.5km) lot-2 Alren Const. Co. Ltd. Jahun/Taura 2,492,310,165.97 2,492,310,165.97 2,114,436,744.00 27/4/2018 8 months 84 On-going

27

Constr of Gambara-Waza-Baranda with Spur to yalwa (16.8km) lot-

3 Alren Const. Co. Ltd. B/kudu 3,194,083,855.93 3,194,083,855.93 3,119,614,701.90 27/4/2018 10 months 96 On-going

28 Constr of Kaugama township road (6.3km) lot-7 Afdin Constr Co. Ltd. Kaugama 1,333,357,771.41 1,333,357,771.41 651,161,382.57 30/4/2018 12 months 49 On-going

29 Constr of Babura Township road (10.28km) lot-8 Triacta Nig. Ltd. Babura 2,624,756,218.01 3,135,597,825.49 2,907,493,341.18 2/5/2018 10 months 93 On-going

30

Commissioning as Consultant for the Supervision of the Constr. of

Road Network at College of Education, Gumel (3.3km) EMACS Eng. Consultants Gumel 11,798,466.27 11,798,466.27 9,038,773.02 7/6/2018 6 months 72 On-going

31

Commissioning as Consultant for the Supervision of the Constr. of

Dutse-Madobi-Katanga-Dangoli with a SPUR from Madobi to

Baranda (35.7km) CURVES and Straight Dutse 81,260,950.27 81,260,950.27 74,966,379.21 7/6/2018 12months 91 On-going

32

Commissioning as Consultant for the Supervision of the Constr. Of

Bariki-Munzarau-Tawakkalta-Turabu-Gidan Mutum Daya road

(16.8km) Himma Technical Services Hadejia 51,099,226.92 51,099,226.92 43,434,342.88 7/6/2018 12 months 85 On-going

33

Commissioning as Consultant for the Supervision of the Constr of

Darai-Gilima road (9.5km) APEX Design & Associates Jahun + Taura 43,615,427.90 43,615,427.90 37,315,427.89 8/6/2018 8 months 85 On-going

34

Commission as Consultant for the Supervision of the Construction

of Gambara-Waza-Baranda with a Spur to Yalwa Wuro Associates Eng. Dutse 55,896,467.48 55,896,467.48 49,188,896.92 7/6/2018 10 months 88 On-going

35

Commission as Consultant for the Supervision of the Construction

of Access road from Harbo Sabuwa to Harbon Tsohuwa (1.52km) Powermatrix Eng Jahun 4,218,516.02 4,218,516.02 3,796,664.41 13/6/2018 4 months 90 On-going

36

Rehabilitation of the electrification project at Marke- yalo ITC line

in Kaugama LGA AG Global serv. Nig ltd Kaugama 40,151,533.53 40,151,533.53 36,276,617.55 6/12/2018 12 weeks 90 On-going

37

Constr of Balago-Dubeni-Kodowawa-Dumadumin Kyaure-Auno

road (41.2km) Lot-3 Gerawa Global Engr. Ltd. Kiyawa 5,321,500,681.77 5,321,500,681.77 4,549,464,150.00 21/12/2018 24 months 85 On-going

38

Construction of 744 - Sabuwar Takur - Yalwawa Road (8.10KM) Lot

7. Retercha Company Ltd Dutse 1,577,371,259.00 1,577,371,259.00 1,154,812,255.80 21/12/2018 10 months 73 On-going

Balance C/F 30,572,575,159.51 31,938,132,762.82

3b

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOC A T ION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 30,572,575,159.51 31,938,132,762.82

39 Construction of Taura - Garki Road (26.68KM) Lot 2. Alren Constr. Comp. Ltd. Taura + Garki 2,925,979,072.38 2,925,979,072.38 2,650,909,720.05 21/12/2018 16 months 91 On-going

40

Construction of Kwanar Medi - Danzomo - Garki Road (29.51KM)

Lot 1. Triacta Nig. Ltd. Gagarawa + Garki 3,583,700,255.94 3,583,700,255.94 1,939,080,265.43 27/12/2018 20 months 54 On-going

41

Construction of Birnin kudu - Zazika - Kwangara Nafadan -

Kadangare - Shirin - Malamawa - Kwatai - Nafara Feeder Road

(33.0KM) Lot 16. Ganan Constr. Co. B/Kudu 1,109,438,407.32 1,109,438,407.32 659,736,236.25 24/12/2018 10 months 60 On-going

42 Construction of Zandam Nagogo Township Road (2.38KM) Lot 12. Ganan Constr. Co. Gwaram 435,973,460.83 435,973,460.83 190,412,659.50 24/12/2018 6 months 44 On-going

43

Construction of Sada - Kanawa - Dankari - Nasarawa - Kudu Feeder

Road (11.2KM) Lot 14. SDY Engr. & Const.. Co. Ltd. Yankwashi 393,697,127.25 393,697,127.25 373,748,968.15 24/12/2018 6 months 94 On-going

44

Construction of Chai-chai Tsohuwa Township Road (1.23KM) Lot

11. Belgrade Engr. & Const. Ltd. Dutse 225,712,752.30 225,712,752.30 44,221,066.37 24/12/2018 6 months 20 On-going

45 Construction of Jigawar Dan Ali Township Road (2.10KM) Lot 9. Mother Cat Nig. Ltd. Babura 427,673,958.29 427,673,958.29 415,503,284.62 24/12/2018 6 months 97 On-going

46 Construction of Miga Township Road (3.1KM) Lot 5. CGC Nig. Ltd. Miga 748,110,079.06 748,110,079.06 59,852,246.48 24/12/2018 8 months 8 On-going

47 Construction of Kiyawa Township Road (Phase II) (4.0KM) Lot 8. CGC Nig. Ltd. Kiyawa 781,689,780.01 781,689,780.01 446,685,490.77 24/12/2018 7 months 57 On-going

48 Electrification Project at Askandu in Kaugama L.G.A. Nabakwai Gen. Enterp. Kaugama 20,298,933.03 20,298,933.03 18,533,808.41 24/12/2018 12 weeks 90 On-going

49

Consultancy services for the Dualization of Fanisau road to Unity

Pentagon round about in Dutse (11.4km) A.G. & Partners Ltd. Dutse 83,028,671.25 83,028,671.25 44,446,452.75 14/7/2017 50 On-going

50 Electrification Project at Alaye in Kirikasamma L.G.A. Dabino Integ. Serv. Ltd. K/kasamma 24,380,538.09 24,380,538.09 17,785,248.08 24/12/2018 12 weeks 87 On-going

51Co mmis s io ning as Co ns ultant fo r the Supervis io n o f the Co ns tr o f

Kaugama To wns hip ro ads (6.3km) SIIS Eng. Co ns ultants Ltd. Kaugama 23,333,761.00 23,333,761.00 10,966,867.67 1/11/2018 12 m,o nths 47 On-going

52Commissioning as consultant for the Supervision of the Construction of

Chai Chai Tsohuwa township Roads UGS Consultants Dutse 3,949,973.17 3,949,973.17 1,224,290.42 20/3/2019 6 weeks 30 On-going

53Commissioning as consultant for the Supervision of the Construction of

Kiyawa Township Roads Phase II (4km) Sadiq Engineering Kiyawa 13,679,571.15 13,679,571.15 9,492,515.76 20/3/2019 6 weeks 69 On-going

54Commissioning as Consultant for the Supervision of the construction of

Kanya Babba Township Roads (2.8km) Curves & Straight design Babura 6,056,229.07 6,056,229.07 4,236,211.35 20/3/2019 6 weeks 70 On-going

55

Commissioning as Consultant for the Supervision of the Construction of

Hammado-Dafarantama-M ele-Baikarya-Garin Baki-Kokinami-Liman M ado

feeder Roads (32.76km) Hag Engineering Gumel 15,959,738.87 15,959,738.87 6,383,855.55 20/3/2019 6 weeks 38 On-going

56Commissioning as consultant for the supervision of the Construction of

Zandam Nagogo township Roads (2.38km) Land Base Engineering Gwaram 7,629,535.56 7,629,535.56 2,288,860.67 20/3/2019 6 weeks 29 On-going

57Commissioning as Consultant for the supervision of the Construction of

Kaugama - M alam M adori Feeder Road (19.31km) SIIS Engineering Consult M /M adori 9,112,024.27 9,112,024.27 20/3/2019 6 weeks On-going

Balance C/F 41,411,979,028.35 42,777,536,631.66

3c

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOC A T ION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 41,411,979,028.35 42,777,536,631.66

58

Commissioning as consultant for the Supervision of the Construction of

Guduncin-Aguyaka Road (4.30km) Curves & Straight design Hadejia 17,024,414.69 17,024,414.69 3,404,881.97 20/3/2019 6 months 19 On-going

59

Commissioning as Consultant for the Supervision of the Construction of

Kwanar M edi-Danzomo-Garki Road (29.51km) Curves & Straight design Garki 62,714,754.77 62,714,754.77 12,542,910.95 20/3/2019 20 months 19 On-going

60 Supervis io n o f Balago -Auno ro ads Apex Des ign Kiyawa + K/hausa 93,126,261.93 93,126,261.93 46,266,287.51 20/3/2019 24 mo nths 50 On-going

61 2019 Rural Electrification Project at Kulawa in Ringim LGA (Lot-9) Ngloma Constr Nig Ltd Ringim 40,761,674.94 40,761,674.94 2/10/2019 14 weeks On-going

62

2019 Rural Electrification Project at Kaigamari M/Awaso in

K/Hausa LGA (Lot-7) Babandoki Gen Entp. K/Hausa 56,156,069.34 56,156,069.34 2/10/2019 14 weeks On-going

63 2019 Rural Electrification Project atTurbus in Maigatari LGA (Lot-8) Babandoki Gen Entp. Maigatari 51,909,858.00 51,909,858.00 2/10/2019 14 weeks On-going

64 2019 Rural Electrification Project at Daurawa in Taura LGA (Lot-11) Ngloma Constr Nig Ltd Taura 39,499,187.75 39,499,187.75 2/10/2019 14 weeks On-going

65 2019 Rural Electrification Project at Batali in Babura LGA (Lot-14) Ngloma Constr Nig Ltd Babura 87,414,189.61 87,414,189.61 2/10/2019 14 weeks On-going

66 2019 Rural Electrification Project at Duwigi in Gwiwa LGA (Lot-13) Babandoki Gen Entp. Gwiwa 45,418,689.70 45,418,689.70 2/10/2019 14 weeks On-going

67

2019 Rural Electrification Project at Ringim in Yankwashi LGA (Lot-

12) Pullad Global Consultant Yankwashi 59,238,524.45 59,238,524.45 2/10/2019 14 weeks On-going

68 2019 Rural Electrification Project at Batu in Birniwa LGA (Lot-5) Masaka Global Concepts Birniwa 42,505,703.10 42,505,703.10 37,994,663.70 2/10/2019 14 weeks 89 On-going

69 2019 Rural Electrification Project at Walawa in Hadejia LGA (Lot-4) Ngloma Constr Nig Ltd Hadejia 52,780,791.53 52,780,791.53 2/10/2019 14 weeks On-going

70 2019 Rural Electrification Project at Kadira in Guri LGA (Lot-6) Xtrax 99 integrated Services Guri 101,346,796.79 101,346,796.79 2/10/2019 14 weeks On-going

71 Electrification project (Lot-17) at Gangara Qtr. In Gumel LGA. Ibrahim Yusuf Integ. Gumel 23,258,058.11 23,258,058.11 2/10/2019 14 weeks On-going

72 Electrification project (Lot-15) at Masko villege in Babura LGA. Nuhabib Nig. Ltd. Babura 32,792,767.93 32,792,767.93 29,136,338.54 2/10/2019 14 weeks 88 On-going

Balance C/F 42,217,926,770.99 43,583,484,374.30

3d

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOC A T ION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 42,217,926,770.99 43,583,484,374.30

73 Electrification project (Lot-2) at Gangawa village in Jahun LGA. Yanduna Ventures Jahun 90,247,560.30 90,247,560.30 2/10/2019 14 weeks On-going

74

Constr of hadejia township roads (485m) road Network) Additional

works) at Azare road-Adua Mosque-New Motor Park (Road II) PAAche Constr Ltd. Hadejia 312,270,011.92 312,270,011.92 2/10/2019 16 weeks On-going

75 Constr of Babura township roads (10.28km) (Additional works) Triacta Nig Ltd. Babura 510,841,607.48 510,841,607.48 2/10/2019 16 weeks On-going

76

Supply and Istallation of Stand Alone Solar powered streetlights at

Government Girls Arabic School Babura, Goverbment Girls Unity Sims Global Resources Gwaram 60,780,300.00 60,780,300.00 4/11/2019 8 weeks On-going

77

Constr of Jigawar Dan Ali Township Road (2.10KM) (Additional

Work) Mother Cat Nig Ltd Babura 203,412,195.00 203,412,195.00 11/12/2019 16 weeks On-going

78

Installation of 100-units of Integrated Standalone Solar Powered

Streetlight at Babaldu town, Birnin Kudu LGA. Ar-Rayyan Ventures Global Birnin Kudu 55,786,500.00 55,786,500.00 24/12/2019 4 weeks On-going

79

Mainatinance and Rehabilitation of some Failed Sections along

Kazaure - Roni Road Retercha Cmp. Nig Ltd Kazaure+Roni 98,528,040.30 98,528,040.30 12/12/2019 16 weeks On-going

80

Electrification projects at Tashena Village and Shagaryo town in

Mallam Madori LGA AHF Global Nig Ltd. M/madori 49,293,924.94 49,293,924.94 41,642,186.99 15/10/2019 16 weeks 95 On-going

81

Supply and installations of 150-units integrated standalone solar

powered streetlight at Garun gudunya and garin gambo towns in

babura and gumel LGAs SIMS Nig. Ltd Babura+Gumel 81,328,800.00 81,328,800.00 24/12/2019 12 weeks On-going

82

Supply and installation of 150-units integrated stand alone

powered streetlights at marke town in kaugama LGA Sims Global Resources Nig Ltd Kaugama 82,797,750.00 82,797,750.00 3/12/2019 12 weeks On-going

TOTAL 43,763,213,460.93 45,128,771,064.24

3e

Ministry of Education

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT COMPL. STATUS REMARKS

AMOUNT CONTRACT SUM (N) C ER T IF IED WOR K DATE PERIOD IN %

1

Procurement of 2-sets of Sporting facilities at Bamaina Talented & Gifted School,

B/kudu L.G.A. BM Inv est. Nig. Ltd. B/kudu 36,030,000.00 36,030,000.00 31,987,558.79 16/8/2012 12 w eeks 85 Stalled

2 Supply of Classrooms, Staff Houses & Office Equip. to JICORAS A. Barde Global Concept. K/hausa 33,143,878.07 33,143,878.07 24,952,793.85 13/12/2012 3 w eeks 75 Stalled

3 Supply of Library books to JICORAS Al-kassam Jannah K/Hausa 30,785,750.00 30,785,750.00 28,526,075.95 2/5/2013 8 w eeks 92 Stalled

4 Constr. w orks at JICORAS (phase II) Datum Constr. Co. K/Hausa 1,677,895,165.73 1,708,557,551.33 1,608,258,817.26 30/8/13 18 w eeks 94 On-going

5

Constr. of 1No. Block of Sabbatical Lodge, 5No Principal Officers Quarters 3No

Blocks 240 Capacity Students Hostels and Construction of Road Netw ork Culv ert

and Drainages at Jigaw a State Univ ersity Kafin Hausa (Phase III) Datum Const. Nig. LTD K/Hausa 2,574,587,179.00 2,782,409,740.68 873,397,813.68 28/11/2013 6 Months 34 On-going

6 Construction of Senate Building at Jigaw a State Univ ersity , K/hausa A.G Ferrero K/Hausa 1,698,949,299.60 1,961,397,871.17 1,759,415,903.28 24/7/2014 10 months 90 On-going

7 Supply and Installation of 5HP Pumps at BEC Camp For the use of State Univ ersity Modang Inv estment Nig. Ltd Auy o 2,436,750.00 2,436,750.00 623,000.00 13/2/2014 8 w eeks 23 Stalled

8

Commissioning as Consultant for the Designing and Superv ision of (phase II) for the

constr.of Jigaw a State Univ ersity , K/Hausa Design Plus + K/Hausa 158,703,031.78 158,703,031.78 117,453,599.98 12/18/2014 18months 74 On-going

9

Procurement of 1000no. College Tablets, CAMP 1000 students for the period of (5)

w eeks E-learning Programme Activ ities Echo Infotech Solutions H/qtrs. 34,311,150.00 34,311,150.00 28,508,507.50 12/3/2015 2 months 83 Stalled

10

Constr of 1no. Block of 2no. Classroom Islamiyya school (3no.) 2nd phase

2017 constituency projects (Lot-5) at Karkarna, Sada and Yalawa in

Yankwashi Constituency. Granitoids Eng Services Yankwashi 9,820,818.00 9,820,818.00 9/5/2018 13 weeks On-going

11

Constr of 1no. Block of 2-classroom Islamiyya at Bakwarga in Buji

Constituency 2017 (phase III) Yayarin Tukur Nig Ltd. Buji 3,269,819.70 3,269,819.70 28/5/2018 8 weeks On-going

12

Constr of Block of 2no. Classroom Islamiyya and Constr of 1no. Block of 3-

classroom and 2no. Block of classroom with office (SUBEB Type) 3rd phase

2017 Constituency project (Lot-9) at K/Arewa, Izala Islamiyya and

Makarantar Malam Daura in Ringim Local Govt. Nushe Business Resources Ringim 9,819,350.10 9,819,350.10 5/7/2018 10 weeks On-going

13

Constr of Drainage at Kuburu-Mabuga (Anku) Titin Yahai Qtrs (907m)

Hadejia town, 1st Qtrs. 2018 Constituency project Tasi'u Mohammed Hadejia 28,264,601.73 28,264,601.73 17/8/2018 3 months On-going

14

Installation of TDN Line, Substation and 40KVA Gen. at GS&TC Ringim (1st

phase 2018 projects) (Lot-30) Yusma Tech Invest. Ringim 11,119,230.57 11,119,230.57 6,006,971.25 12/7/2018 6 months 55 On-going

15

Installation of TDN Line, Substation and 20KVA Gen. at GS&TC B/kudu and

Installation of TDN line at SSS K/Babba (Lot-31) Math Global Concept B/Kudu + Babura 12,717,747.66 12,717,747.66 8,916,752.51 16/7/2018 6 months 67 On-going

16

Construction of Senate Building along with the provition of parking Lots

and walk ways at Sule Lamido University, Kafin Hausa (additional Works). A.G Ferrero Building K/Hausa 262,448,571.57 262,448,571.57 23/10/2018 24 weeks On-going

17

Construction of Block of 2-Classroom Islamiyya (3NO.) Lot-19 at Jigawar

Maroka, Kiyawa K/fada and Tuje in Kiyawa Constituency Demastbo Ventures Ltd. Kiyawa 9,342,612.24 9,342,612.24 1/11/2018 10 Weeks On-going

BAL. C/F 6,593,644,955.75 7,094,578,474.60

4a

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 6,593,644,955.75 7,094,578,474.60

18

Feeding of 597 Boarding School students at MBPS/JSS Kazaure & 35

students at Intel Disability Kazaure in Kazaure LGA (2019 MOEST Capital

Projects) Lot-40. Umar Aliyu & Sons Kazaure 23,888,538.40 23,888,538.40 23/12/2020 40 weeks On-going

19

Construction of Block of 2-Classroom Islamiyya (1NO.) Lot-20 at Dunnaka

in Miga Constituency. Amia Integ. Service Nig Ltd. Miga 3,115,779.08 3,115,779.08 1/11/2018 4 Weeks On-going

20

Construction of Block of 2-Classroom Islamiyya (2NO.) Lot-2 at Rakumin

Rafa and Kasabur in Birniwa Constituency. Amm Manzo Nig. Ltd. Birniwa 6,224,550.80 6,224,550.80 1/11/2018 10 weeks On-going

21

Construction of Block of 2-Classroom Islamiyya (2NO.) Lot-2 at Rakumin

Rafa Constituency. Bulangu Drilling Services 6,968,430.00 6,968,430.00 1/11/2018 10 Weeks On-going

22

Construction of Block of 2-Classroom Islamiyya (7NO.) Lot-10 at Sabalari,

kishingawa, Limawa Gabar, Dan masara, Chamo Gari, Yalwawa and Buju in

Dutse Constituency. Al-kasam Jannah Nig. Ltd. Dutse 21,687,679.15 21,687,679.15 5/11/2018 20 Weeks On-going

23

Construction of Block of 2-Classroom Islamiyya (1NO.) 2nd Phaes 2017

Constituency Projects (Lot-16) at Government Arabic Secondry School

(G.A.S.S.) in Sule Tankarkar Constituency. Kairussabah Nig. Ltd. S/tankarkar 3,224,219.90 3,224,219.90 1/11/2018 3 Weeks On-going

24

Construction of Block of 2-Classroom Islamiyya (2Nos.) at Kankare & Raha

and (1NO.) Block of 3-Classroom Subeb Type at Tsardawa in Kanya Babba

Constituency, (Lot-1) Babura Local Government Area. DeeTech Nig Ltd. Babura 13,885,760.58 13,885,760.58 15/10/2018 10 weeks On-going

25

Construction of (1N0.) Blocks of 2-classroom Islamiyya school SUBEB

typed 2018 phase II constituency projects (Lot -7) atDanmakeri in Ringim

constituency. Mai-Mai Blocks ind. Nig. Ltd Ringim 4,940,040.00 4,940,040.00 1/11/2018 6 weeks On-going

26

Construction of (2 No.) Blocks of 2-Classroom Islamiyya School Typed

2018 Phase II Constituency Projects (Lot-19) at Karkarna and Ruruma in

Yankwashi Constituency. Granitoids Engr. Services Ltd Yankwashi 6,224,045.10 6,224,045.10 18/12/2018 8 weeks On-going

27

Construction of (2 No.) Blocks of 2-Classroom Islamiyya School Typed

2018 Phase II Constituency Projects (Lot-2) at Majingini and Babban

Kambari in Gumel Constituency. Jag & H Intgrated Services Ltd. Gumel 6,230,703.46 6,230,703.46 3,010,358.03 5/12/2018 8 weeks 48 On-going

28

Constr of (3no.) block of 2-classroom Islamiyya School typed 2018 phase II

constituency projects (Lot-13) atHussaindeen Babangida Jahun, Atuman

Harbo Sabuwa and Ruwan Dawa in Jahun Constituency. AGA Kilawa Nig. Ltd Jahun 9,311,022.00 9,311,022.00 5,209,942.50 5/12/2018 10 weeks 55 On-going

29

Construction of (1 No.) Blocks of 3-Classroom, 1-Block of 6-Seater VIP Pit

Latrine and Hand Pump at Govt. Day Arabic Secondary School Birniwa (Lot-

1). MWT Real Estate & Gen. Mer. Birniwa 12,639,228.22 12,639,228.22 28/12/2018 3 months On-going

30

Construction of 1-Blocks of 6-Classroom (1st & 2nd Quarter 2018

UBEC/SUBEB Intervention Project) Lot-5 G/Sarki and Construction of 2-

Classrooms with Office, Staff Room, Meeting Room and Toilet at Ruhogo in

Hadejia L.G.A. Step by Step Intergrated Serv Hadejia 31,639,463.50 31,639,463.50 18/11/2018 16 weeks On-going

31

Construction of Blocks of 2-Classroom Islamiyya Typed (2No.) Lot-6 at

Tashena and Kargon Gabas in Malam madori Constituency. Express Innovation Concept M/madori 6,208,148.10 6,208,148.10 27/12/2018 6 weeks On-going

32

Construction of (1No.) Blocks of Teachers Lodge 2018 Phase III

Constituency Projects (Lot-25) at Kanya Babba in Kanya Constituency. Deetech Nig. Ltd. Gwaram 12,701,001.00 12,701,001.00 18/12/2018 12 weeks On-going

33

Construction of (2 No.) Blocks of 2-Classroom Islamiyya School Typed

2018 Phase III Constituency Projects (Lot-24) at Garun Gabas in Malam

madori Constituency. Nabakwai Gen. Enterprises M/madori 3,115,351.08 3,115,351.08 18/12/2018 8 weeks On-going

BAL. C/F 6,765,648,916.12 7,266,582,434.97

4b

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 6,765,648,916.12 7,266,582,434.97

34

Constr of (3no.) blocks of 2-classroom Islamiyya school typed 2018 phase

III constituency projects (Lot-13) at Ajura, Kekau and Garki in Garki

Constituency. Mugin Investment Nig. Ltd. Garki 9,341,037.24 9,341,037.24 18/12/18 10 weeks On-going

35

Constr of (10no.) block of 2-classroom Islamiyya School typed 2018 phase

III constituency projects (Lot-3) at Gida Dubu, Kargo Yamma, Kudai

Yamma, Zobiya, Tofa, Galadimawa, Katangare, Irwa, Gandun Mazare and

Baranda in Dutse Constituency. Mugin Investment Nig. Ltd. Dutse 31,136,790.83 31,136,790.83 12,836,962.26 24/12/2018 15 weeks 39 On-going

36

Constr of 1no. Block of 2-Classroom islamiyya school each ( 2019 first

quarter phase 2 Constituency projects) Lot-1 at Girdo, Tasawa and

Tsamiyar Kwance in Kanya Babba Constituency Babura Local Government

Area Dee- Tech Nig Ltd Babura 9,347,337.24 9,347,337.24 27/11/2019 13 weeks On-going

37

Constr of 1no. Block of 2-Classroom islamiyya school each ( 2019 first

quarter phase 2 Constituency projects) Lot-7 at Jauga, Jankawa Yola,

Karwai, Wailari and Budai in Ringim Constituency Marb eng. & Multi service Nig Ltd Ringim 15,576,585.00 15,576,585.00 27/11/2019 8 weeks On-going

38

Construction of (3No.) Blocks of 2-Classroom Islamiyya School Typed 2018

Phase III Constituency Projects (Lot-10) at Dan Barage, Tela Rabiu

Residence Babura Kofar kudu and Jigawa Yamma in Babura Constituency. Mufabamex Concept Nig. Ltd. Babura 9,341,037.24 9,341,037.24 18/12/2018 10 weeks On-going

39

Procurement and Distribution of Instructional Materials Basic Levels

across the State. Ngaloma Constr. Co. Across the state 62,319,731.25 62,319,731.25 28/12/2018 12 weeks On-going

40

Constr of 1no. Block of 2-classroom islamiyya school each Lot-9 (first qtr.

Phase II 2019 constituency project) at Ung. Kalgo, Kuda Walawa and Bade

Fulani in Yankwashi Constituency. Granitoids Eng Serv. Ltd. Yankwashi 9,339,771.12 9,339,771.12 11/12/2019 12 weeks On-going

41

Renovation of Structures at Government Science Secondary School Lautai

Gumel ( Phase II) Gerawa Gobal Engr Ltd Gumel 98,014,279.51 98,014,279.51 50,616,896.92 21/06/2019 6 month 52 On-Going

42

Feeding of 1,407 Boarding School students at GGASS Babura in Babura LGA

(2019 MOEST Capital Projects) Lot-1. JALGO Integ. Services Ltd. Babura 53,186,214.40 53,186,214.40 23/12/2019 40 weeks On-going

43

Commissioning as Consultant for the Training and Technical Support of

250No Senior Secondary School Teachers on K-Yan Machine for the

Facilitation of E-Learning at Senior Secondary Schools Across the State C-Stemp Construction Skills Across the state 36,227,761.00 36,227,761.00 32,604,984.89 24/5/2019 6 Month 90 On-going

44

Constr of 1no. Block of 3-classrooms each at GDSS Babura, GDSS

Galagamma Gumel, GDSS babura and GDSS Ringim Areawa (2019 Capital

projects) Babandoki Gen Entp. Ringim 44,808,022.00 44,808,022.00 3/10/2019 12 weeks On-going

45

Constr of 1no. Block of 3-classrooms each at GDSS Dan Masara, GDSS

Jahun, GDSS Shagari Qtrs Hadejia and GDSS M/madori (2019 Capital

projects) Math Global Invest. M/madori 44,808,022.00 44,808,022.00 3/10/2019 12 weeks On-going

46

Renovation of Staff Quarters at College of Education Gumel, Lot-7 (3rd &

4rd Quarter 2019 Capital projects) Babandoki General Entr Gumel 233,513,402.67 233,513,402.67 27/11/2019 12 weeks On-going

47

Construction of 1No Block of 2 classroom Islamiyya School each, Lot-4

(First Quarter 2019 Constituency Project) at Dodal (Nomadic and Jammaje

Gafaffa in Gwiwa Isah Halilu Nig Ltd Gwiwa 6,226,306.20 6,226,306.20 2 7 /1 1 /2 01 9 8 weeks On-going

48

Construction of classrooms Blocks at Jigawa College of Remedial and

Advance Studies(JICORAS) Babura, Lot-4 (3rd & 4rd Quarter 2019 Capital

Projects) Babandoki General Entr Babura 120,213,423.86 120,213,423.86 2 7 /1 1 /2 01 9 24 weeks On-going

BAL. C/F 7,549,048,637.68 8,049,982,156.53

4c

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 7,549,048,637.68 8,049,982,156.53

49

Construction of 1No Block of 2 Classroom islamiyya School Lot-14B (First

Quarter 2019 Constituency Project) at Hassan Hadejia in Hadejia

constituency Muhal Global Concept Ltd Hadejia 9,100,200.00 9,100,200.00 2 7 /1 1 /2 01 9 9 weeks On-going

50

Renovation of 13No Students Hostels at College of education Gumel, Lot-8

(3rd &b 4rd Quarter 2019 Capital Projects) Babandoki General Entr Gumel 148,840,065.71 148,840,065.71 2 7 /1 1 /2 01 9 12 weeks On-going

51

Construction of Hostel Block at Jigawa College of remedial and Advance

Studies (JICORAS) Lot-5 (3rd & 4th Quarter 2019 Capital Projects) Ngaloma Constr Co Ltd K/Hausa 100,763,064.17 100,763,064.17 2 7 /1 1 /2 01 9 24 weeks On-going

52

Construction of 1No. 2 classroom Islamiyya School each, Lot-6 (First

Quarter 2019 Constituency Project at Abur, Margadu, Ahlal Sunnah

Islamiyya, Musari and Wareri in Guri Constituency Adam General Enter Ltd Guri 15,576,795.40 15,576,795.40 2 7 /1 1 /2 01 9 8 weeks On-going

53

Construction of 2No Block of 2 Classroom Islamiyya ( 2018 Phase II

Ongoing Constituency Projects) Lot-10 at danksoshe and Jatafinnamari in

Buji Constituency Mai-Mai Blocks Industry Ltd Buji 6,231,539.60 6,231,539.60 18/11/2019 8 weeks On-going

54

Construction of 1No Block of 2 Classroom Islamiyya School each Lot-12

(First Quarter 2019 Constituency Project at Kan Hawa Roni, Santar Tsaye

and Sabuwar Santa Tunas in Roni Constituency Yanduna Ventures Ltd Roni 9,339,248.04 9,339,248.04 27/11/2019 10 weeks On-going

55

Construction of 3no Block of 2 classroom Islamiyya ( 2018 Phase III Ongoing

Constituency Projects) Lot-12 at Garin Kwalandi and Kabara in Maigatari

Constituency NBS & Sons Constr Ltd Maigatari 15,140,562.72 15,140,562.72 18/11/2019 12 weeks On-going

56

Construction of Malam Makera Islamiyya School (Upstairs) 2018 III

Ongoing Constituency project (Lot-1S) at Malam Abdullahi islamiyya

Hadejia in Hadejia Nabakwai General Entr Hadejia 16,341,041.20 16,341,041.20 18/11/2019 12 weeks On-going

57

Construction of 1No Block of 2 Classroom Islamiyya (2018 Phase II Ongoing

Constituency Projects) Lot-7 at Guri in Guri Constituency Nushe Business Resources Guri 3,115,779.08 3,115,779.08 18/11/2019 8 weeks On-going

58

Construction of 2No Block of 2 Classroom Islamiyya (2018 Phase III Ongoing

Constituency Projects ) Lot-7 at Garin Musa and Daneri in Birniwa

Constituency BDU Ventures Ltd Birniwa 6,227,358.16 6,227,358.16 18/11/2019 8 weeks On-going

59

Construction of 1No Block of Science Laboratory and Administrative Block

(Lot-1) at GDSS Kukuma in Buji Constituency project 2019 Yayarin Tukur Nig Ltd Buji 22,937,034.15 22,937,034.15 14/11/2019 8 weeks On-going

60

Construction of 1No Block of 2 classroom Islamiyya (2018 Phase III Ongoing

Constituency Projects) Lot-1B at Maskangayu In Auyo Constituency DDN Constr Nig Ltd Auyo 3,115,359.08 3,115,359.08 18//11/2019 8 weeks On-going

61

Constr of 1no. Block of 2-classroom islamiyya school each ( 2019 first

quarter phase 2 Constituency projects) Lot-19B at Kunduwaje and Gagura

in Gwaram Constituency, Nushe Bus, Resources Nig Ltd Gwaram 6,685,247.76 6,685,247.76 11l12l2019 6 weeks On-going

62

Constr of 1no. Block of 2-classroom islamiyya school each ( 2019 first

quarter phase 2 Constituency projects) Lot-16 at Ramin kura, Juwan,

Masaru and Nasarawa in Birnin Kudu Constituency, Nushe Bus, Resources Nig Ltd B/kudu 12,888,711.92 12,888,711.92 11/12/2019 10 weeks On-going

63

Constr of Hand Pump Boreholes Water Supply Schemes Constituency

projects (2019 First Quarter) Lot-9 at Askawa, Kulawa Babare, Achau Boro,

Lugga Dashi, Tokai Arewa, Ung. M. Nagoggo, Damutawa, Gabashi, Rinde

fulani, Bakin Kasuwa, Ung. Isah Yar Jigawa, Gwamfai Sabon Gari, Tsangaya,

Kulluru Yammaci, Alikau, Sukullufi, Gidan Atiku, Makera, Gwamfai, Achau

Auyakayi and Likindin Gabashi in Jahun Contituency. Danfatu & sons Nig Ltd Jahun 14,755,650.00 14,755,650.00 11/12/2019 8 weeks On-going

BAL. C/F 7,940,106,294.67 8,441,039,813.52

4d

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 7,940,106,294.67 8,441,039,813.52

64

Constr of 1no. Block of 2-Classroom islamiyya school each ( 2019 first

quarter phase 2 Constituency projects) Lot-13 at Kiri Hawandu, Katarika

and Kawari/Gujungu in Taura Constituency Nushe Bus, Resources Nig Ltd Taura 11,719,771.12 11,719,771.12 27/11/2019 12 weeks On-going

65

Constr of additional 1no. Block of 3- Classrooms each at GDSS Kazaure,

GDSS Sabon Gida, GDSS Haruna (Hadejia), GDSS Fagoji, GDSS Galagamma

Gumel and GDSS Famfo Goma Hadejia (2019 MOEST Capital project) Al-sabur Global Links Nig Ltd State 67,212,333.84 67,212,333.84 3/12/2019 12 weeks On-going

66

Constr of 1no. Block of 2-classroom islamiyya school each ( 2019 first

quarter phase 2 Constituency projects) Lot-10B, at Bashuri in Dutse

Constituency, Al-kheeyad Nig Ltd Dutse 3,115,676.00 3,115,676.00 11/12/2019 8 weeks On-going

67

Constr of Toilets, Classrooms, Admin Blocks, Laboratories and Hand

Pumps at GDSS Ringim Arewa, K/Babba, Gujungu, Sakwayya and G/Kuka

(2019 Last Quarters MOEST Capital project Across the state (Lot-1ABCD&E) Ngaloma Constr Nig Ltd Ringim 103,609,125.68 103,609,125.68 23/12/2019 12 weeks On-going

68

Constr of Toilets, Classrooms, Admin Blocks, Laboratories and Hand

Pumps at GDSS Bosuwa, Taura, and Gumel (2019 Last Quarters MOEST

Capital project Across the state (Lot-3AB&C) Babandoki Gen. Enterp Nig Ltd Gumel 104,213,888.67 104,213,888.67 23/12/2019 12 weeks On-going

69

Constr of Classes, Laboratories at GDSS Kafin Hausa, Kadira, Shagari,

Dakido, Kanti, Roni, Danmasara, Kudai, Birnin Kudu, Malamadori and

Kiyawa (2019 Last Quarters MOEST Capital project Across the state (Lot-

5ABC&D) Sabon Garin yaya Nig Ltd Kiyawa 106,186,110.20 106,186,110.20 27/12/2019 12 weeks On-going

70

Constr of Toilets, Classrooms, Admin Blocks, Laboratories and Hand

Pumps at GDSS Galadi, GDSS Marabusawa, GDSS Dakido (2019 Last

Quarters MOEST Capital project Across the state (Lot-4AB&C) Math Global Invt. Nig Ltd Across the state 104,338,846.77 104,338,846.77 27/12/2019 12 weeks On-going

71

Constr of Toilets, Classrooms, Admin Blocks, Laboratories and Hand

Pumps at GDSS Danzomo, GDSS Abdulkadir, and GDSS Babaldu (2019 Last

Quarters MOEST Capital project Across the state (Lot-7AB&C) Pullad Global Consultant Nig LtdAcross the state 114,843,483.25 114,843,483.25 27/12/2019 12 weeks On-going

72

Constr of Toilets, Admin Blocks, Laboratories and Wall Fence, 7no. JSQ

Eamination Hall and additional course of Blocks Hand pumps at GDSS

Kazaure, Dutse Capital, Bamaina Academy, Dutse Model and GDSS Jabo

(2019 Last Quarters MOEST Capital project Across the state (Lot-6

ABCDE&F) Pullad Global Consultant Nig LtdAcross the state 109,273,620.31 109,273,620.31 27/12/2019 12 weeks On-going

73

Constr of Admin. Block, 21 Laboratories, Computer Lab. And 3-Blocks of 12

Classrooms at Mega School Dutse (2019 Last Quarter MOEST Capital

projects) Across the State (Lot-8 ABC & D) Babandoki Gen. Enterp Nig Ltd Across the state 224,397,873.13 224,397,873.13 23/12/2019 12 weeks On-going

74

Constr. of 1-block of 2-classrooms islamiyya school each (2019 first

quarter phase II constituency projects) Lot-19 at B/kasuwa, Sakuwa and

Ranbazau in Gwaram constituency Farham Synergy Ltd Gwaram 9,344,513.19 9,344,513.19 11/12/2019 8 Weeks On-going

75

Constr of 1-block of 2-classrooms islamiyya school each (2019 first quarter

phase II constituency projects) Lot-10A at jidawa, rahama, duru gari,

karnaya gari, abanderi, hara and tashar D/wake in Dutse constituency Backbone global links ltd Dutse 21,724,075.66 21,724,075.66 27/12/2019 18 Weeks On-going

BAL. C/F 8,920,085,612.49 9,421,019,131.34

4e

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 8,920,085,612.49 9,421,019,131.34

76

Constr of 1-block of 2-classrooms islamiyya school each (2019 first quarter

phase II constituency projects) Lot-11 at dahuwa kaku in kiri kasamma

constituency Nabakwai gen. entr. K/kasamma 3,103,439.45 3,103,439.45 27/12/2019 8 Weeks On-going

77

Constr of 1-Block of 2-classrooms islamiyya school each (2019 first quarter

Phase II Constituency projects) Lot-14A at Abdulkadir Secondary School,

Matasro Junior Secondary School and Unguwar Mai aye in Hadejia

constituency Step by Step Int. Ser. Ltd Hadejia 9,334,463.01 9,334,463.01 11/12/2019 10 weeks On-going

78

Constr of Additional 6no. Blocks of 1-block of 3-classrooms at GDSS

Kondiko, GGDSS B/kudu, GDSS Kwarko, GDSS Kiyako, GDSS S/garin Takanebu

and GDSS Galamawa Babandoki Gen. Entp. B/kudu 67,198,406.92 67,198,406.92 24/12/2019 10 weeks On-going

79 Constr of 1-block of two Science Laboratories at GGDSS Roni Manhaf Global Concept Roni 33,552,607.41 33,552,607.41 24/12/2019 16 weeks On-going

80

Constr of 1-Block of 2-classrooms islamiyya school each (2019 first quarter

Phase II Constituency projects) Lot-20 at garkon alli in kiyawa constituency Yarkwari global serv Nig. Ltd Kiyawa 3,113,973.13 3,113,973.13 27/12/2019 12 weeks On-going

81

Constr of 1-Block of 2-classrooms islamiyya school each (2019 first quarter

Phase II Constituency projects) Lot-3B at Zamini tagir in Auyo constituency Yarkwari global serv Nig. Ltd Auyo 3,013,570.00 3,013,570.00 27/11/2019 8 weeks On-going

82

Construction of classes and admin block at GDSS Kwalam, wurno,

kyarama, and sankara across the state (2019 last quarter MOEST capital

projects) lots-9ABCD$E Allah Abin Godiya Nig Ltd Across the state 51,991,144.67 51,991,144.67 23/12/2019 12 weeks On-going

83

Constr, of 2No. Block of 2 Classroom islamiyya (2018 Phase iii on Going

Constituency Projects) Lot-2 at Dadda Gari, Madoji Gari, Jeke Gari and

Sarkin Gandu in Sule Tankarkar Constituency. Danfatu & sons Nig Ltd S/tankarkar 12,454,716.33 12,454,716.33 18/11/2019 12 weeks On-going

84

Renovation of WindstormDamaged Structures at Government Science

Technical college Karkarna, Science Secondary School Kafin Hausa and

Girls Science Secondary School Jahun Across the state (2019 MOEST

Capital Projects). Allah Abin Dogaro Nig Ltd Across the state 35,803,002.26 35,803,002.26 24/12/2019 8 weeks On-going

85

Feeding of 2309 Boarding school Students at GGSS Garki in Garki local Govt

(2019 MOEST Capital projects) Lot-7 MMZ Garki Gen Constructors Garki 87,276,300.00 87,276,300.00 23/12/2019 40 weeks On-going

86

Constr, of 2No. Block of 2 Classroom islamiyya Each (2018 first Quarter

Phase II Constituency Projects) Lot-21 at Ung. Kalgo, Kuda walawa and

Bade fulani yankwashi Constituency. Granitoids Engr Services ltd Yankwashi 9,339,771.12 9,339,771.12 11/12/2019 12 weeks On-going

87

Constr, of 1No. Block of 2 Classroom islamiyya Each (2019 first Quarter

Phase II Constituency Projects) Lot-18 at Aduwa in Kafin Hausa

Constituency. Mai Mai Blocks Ind. Nig. Ltd K/Hausa 3,111,654.55 3,111,654.55 11/12/2019 9 weeks On-going

88

Feeding of 1,003 Boarding school students at GGSSS Taura in Taura LGA

(2019 MOEST Capital projects) Lot-26 Dankwara Maijimina Gen. Entp. Across the state 37,911,714.80 37,911,714.80 23/12/2019 40 weeks On-going

89

Feeding of 433 Boarding school students at GJSSS Guri in Guri LGA (2019

MOEST Capital projects) Lot-28 Baradugum Gen. Entp. Guri 16,366,540.00 16,366,540.00 23/12/2019 40 weeks On-going

90

Feeding of 970 Boarding school students at GGSS S/tankarkar in

S/tankarkar LGA (2019 MOEST Capital projects) Lot-24 Hassan Habu T. Gen. Entp. S/tankarkar 39,182,001.60 39,182,001.60 23/12/2019 40 weeks On-going

91

Feeding of 790 Boarding school students at GSTC Hadejia in Hadejia LGA

(2019 MOEST Capital projects) Lot-12 A.H.M. Global Ventures Hadejia 29,860,672.80 29,860,672.80 23/12/2019 40 weeks On-going

BAL. C/F 9,362,699,590.54 9,863,633,109.39

4f

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 9,362,699,590.54 9,863,633,109.39

92

Constr of Wall fence at Jigawa College of Remedial and Advance Studies

(JICORAS) Babura, Lot-2 (3rd & 4th Qtr. 2019 Capital Projects) Ngaloma Constr. Co. Ltd. Babura 131,969,392.51 131,969,392.51 27/11/2019 24 weeks On-going

93

Constr of Admin Block at Jigawa College of Remedial and Advance Studies

(JICORAS) Babura, Lot-1 (3rd & 4th Qtr. 2019 Capital Projects) Ngaloma Constr. Co. Ltd. Babura 83,365,963.69 83,365,963.69 27/11/2019 24 weeks On-going

94

Supply of Science Laboratories Equipment for Distribution to Senior Sec

School Across the state Aldan Project Ltd Across the state 29,491,628.72 29,491,628.72 24/12/2019 8 weeks On-going

95

Procurement of Science Laboratory equipment for distribution to 9no

Science Centre of Excellence Core-2 Quest Ventures Ltd. Across the state 81,037,103.92 81,037,103.92 24/12/2019 3 weeks On-going

96

Feeding of 1031 Boarding school students at GGASS Danzomo in Sule

tankarkar Local Government Area (2019 MOEST Capital project) Lot-25 Salisu & Isah Gen. Entp. Danzomo 38,969,984.00 38,969,984.00 23/12/2019 40 weeks On-going

97

Feeding of 1,762 Boarding school students at GUSS Maigatari in Maigatari

Local Government Area (2019 MOEST Capital project) Lot-20 Shabarawa Gen. Enterpr Babura 66,600,638.40 66,600,638.40 23/12/2019 40 weeks On-going

98

Feeding of 426 Boarding school students at Science secondary school

kanya Babba in Babura Local Government Area (2019 MOEST Capital

project) Lot-41. H.A.U. Gen. enterp. Babura 16,102,084.40 16,102,084.40 23/12/2019 40 weeks On-going

99

Feeding of 635 Boarding school students at MBPS/JSS Ringim in Ringim

Local Government Area (2019 MOEST Capital project) Lot-35 H.A.U. Gen. enterp. Ringim 23,875,921.20 23,875,921.20 23/12/2019 40 weeks On-going

100

Feeding of 3378 Boarding school students at GUSS Ringim in Ringim Local

Government Area (2019 MOEST Capital project) Lot-21. H.A.U. Gen. enterp. Ringim 127,667,604.80 127,667,604.80 23/12/2019 40 weeks On-going

101

Feeding of 761 Boarding school students at SSS Lautai in Gumel Local

Government Area (2019 MOEST Capital project) Lot-8. Bakar Kasa Gen. Enter. Gumel 28,764,521.60 28,764,521.60 23/12/2019 40 weeks On-going

102

Feeding of 1,030 Boarding school students at SAIS Hadejia Local

Government Area (2019 MOEST Capital project) Lot-13 MS Amar & son enterp Hadejia 38,932,269.60 38,932,269.60 23/12/2019 40 weeks On-going

103

Feeding of 753 Boarding school students at GGCSS Roni in Roni Local

Government Area (2019 MOEST Capital project) Lot-23 Talba Gen. Enterp Roni 28,462,134.80 28,462,134.80 23/12/2019 40 weeks On-going

104

Feeding of 1319 Boarding school students at GUSS Roni and 170 tsangaya

school students at Gwiwa in Roni and Gwiwa Local Government Area

(2019 MOEST Capital projects) Lot-22 Adon Sale Bandu Across the state 57,699,603.60 57,699,603.60 23/12/2019 40 weeks On-going

105

Feeding of 1572 Boarding school students at GUSS Fantai and 279 students

at school for deaf in hadejia Local Government Area (2019 MOEST Capital

project) Lot-11 Alh. Muhammad Kwalli Gen. Hadejia 69,924,690.40 69,924,690.40 23/12/2019 40 weeks On-going

106

Feeding of 1703 Boarding school students at GUSS Malammadori in

Malammadori Local Government Area (2019 MOEST Capital project) Lot-37 AG Isyaku Gen Ent M/madori 64,366,351.60 64,366,351.60 23/12/2019 40 weeks On-going

107

Feeding of 445 Boarding school students at GSTC Karkarna in Yankwashi

Local Government Area (2019 MOEST Capital project) Lot-27 Malabai Gen Ent Yankwashi 16,820,252.40 16,820,252.40 23/12/2019 40 weeks On-going

108

Feeding of 580 Boarding school students at GJSSS Karkarna in Yankwashi

Local Government Area (2019 MOEST Capital project) Lot-29 Malabai Gen Ent Yankwashi 21,923,025.60 21,923,025.60 23/12/2019 40 weeks On-going

109

Feeding of 635 Boarding school students at MBP/JSS Gumel and 60

Tsangaya school students at Mai Aduwa in Gumel Local Government Area

(2019 MOEST Capital project) Lot-32 Wangara Agent Gen Ent. Gumel 26,406,169.60 26,406,169.60 23/12/2019 40 weeks On-going

BAL. C/F 10,315,078,931.38 10,816,012,450.23

4g

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 10,315,078,931.38 10,816,012,450.23

110

Feeding of 453 Boarding school students at GSTC Ringim in Ringim Local

Government Area (2019 MOEST Capital project) Lot-36 Maidala Gen. Ent. Ringim 17,122,640.00 17,122,640.00 23/12/2019 40 weeks On-going

111

Feeding of 2,254 Boarding school students at GGUSS Gwaram in Gwaram

Local Government Area (2019 MOEST Capital project) Lot-9 Gobirawa kwari Gen. Ent. Gwaram 84,333,796.80 84,333,796.80 23/12/2019 40 weeks On-going

112

Feeding of 1231 Boarding school students at GGASS birniwa in birniwa

Local Government Area (2019 MOEST Capital project) Lot-4 A.I. Maiso Gen. Ent. Birniwa 46,529,720.00 46,529,720.00 23/12/2019 40 weeks On-going

113

Feeding of 728 Boarding school students at GGJSSS Miga in Miga Local

Government Area (2019 MOEST Capital project) Lot-31 Yusif Garba Miga Gen. Ent. Miga 27,511,020.00 27,511,020.00 23/12/2019 40 weeks On-going

114

Feeding of 1,380 Boarding School students at GUSS Malam Madori LG

(MOEST Capital Projects)LOT-19 SawIra gen enterprises M/madori 52,161,681.60 52,161,681.60 23/12/2019 40 weeks On-going

115

Feeding of 1,122 Boarding School students at GSS Aujara in Jahun LG

(MOEST Capital Projects)LOT-15

Adamu Ibrahim Aujara Gen.

Entp. Jahun 42,687,419.20 42,687,419.20 23/12/2019 40 weeks On-going

116

Feeding of 621 Boarding School students at SAIS Fatara in Dutse LG (MOEST

Capital Projects)LOT-6 Baita Daushanga Gen. Entp. Dutse 23,394,510.80 23,394,510.80 23/12/2019 40 weeks On-going

117

Feeding of 1,233 Boarding School students at MBPS/JSS KILA Gwaram LG

(MOEST Capital Projects)LOT-42 Baita Daushanga Gen. Entp. Gwaram 46,605,328.40 46,605,328.40 23/12/2019 40 weeks On-going

118

Feeding of 882 Boarding School students at GUSS Basirka Gwaram LG

(MOEST Capital Projects)LOT-10 Baita Daushanga Gen. Entp. Gwaram 33,333,159.20 33,333,159.20 23/12/2019 40 weeks On-going

119

Feeding of 554 Boarding School students at MBP/JSS Guri, 58 Tsangaya

School students at Tarabu and 60 Tsangaya School students at Birniwa in

Guri and Birniwa LG (2019 MOEST Capital Projects)LOT-34 GMA Kadira gen. enterprises Guri+Birniwa 25,893,694.00 25,893,694.00 23/12/2019 40 weeks On-going

120

Feeding of 940 Boarding School students at science secondary school (SSS)

Kafin Hausa in Kafin Hausa LG (MOEST Capital Projects)LOT-16 Zango Gen. enterprises K/Hausa 35,530,420.80 35,530,420.80 23/12/2019 40 weeks On-going

121

Feeding of 467 Boarding School students at GSTC Birnin kudu in Birnin kudu

LG (MOEST Capital Projects)LOT-3 Baita Daushanga Gen. Entp. B/kudu 17,651,815.60 17,651,815.60 23/12/2019 40 weeks On-going

122

Feeding of 1,077 Boarding School students at GGASS Kaugama in Kaugama

LG (MOEST Capital Projects)LOT-17 Danbiri Global Ventures Kaugama 40,709,000.80 40,709,000.80 23/12/2019 40 weeks On-going

123

Feeding of 639 Boarding School students at MBPS/JSS Bulangu in Kafin

Hausa LG (MOEST Capital Projects)LOT-33

Hussaini Ahmed bookshop

Gen Entp. K/Hausa 24,027,126.40 24,027,126.40 23/12/2019 40 weeks On-going

124

Feeding of 920 Boarding School students at GGUSS Kazaure in Kazure LG

(MOEST Capital Projects)LOT-18 Haru jika Gen. Entp. Kazaure 34,767,096.00 34,767,096.00 23/12/2019 40 weeks On-going

125

Feeding of 2309 Boarding School students at GGSS Garki in Garki LGA

(MOEST Capital Projects)LOT-7 MMZ Garki Gen Const Garki 87,276,300.00 87,276,300.00 23/12/2019 40 weeks On-going

126

Feeding of 674 Boarding School students at MBPS/JSS Kudai in Dutse LGA

(MOEST Capital Projects)LOT-43 Sabuwar Kuka Gen Enterp Dutse 25,476,067.60 25,476,067.60 23/12/2019 40 weeks On-going

127

Feeding of 788 Boarding School students at GJSSS Aujara in Jahun LGA

(2019 MOEST Capital Projects)LOT-30 Na'ima and Fati Gen. Entp. Jahun 29,785,076.00 29,785,076.00 23/12/2019 40 weeks On-going

128

Constr. Of Gate House and Toilet at Jigawa Colege od Remedial and

advance Studies (JICORAS) Babura, Lot- 3 (3rd and 4th Quarter 2019 Capital

Project) Al-sabur Global Nig. Ltd Babura 39,190,677.39 39,190,677.39 27/11/2019 24 Weeks On-going

129

Constr. Of 1No. Block of 2-Laboratories at GGDSS Roni (2nd Quarter 2019

Constituency Project) Lot-1 Manhaf Global Constr Nig Ltd Roni 33,552,607.41 33,552,607.41 24/12/2019 12 weeks On-going

BAL. C/F 11,082,618,089.38 11,583,551,608.23

4h

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 11,082,618,089.38 11,583,551,608.23

130

Construction of additional block of 3 classrooms each at kondiko, GGASS

Binin kudu, GDSS kwarko, GDSS kiyako, GDSS sabon gari takanebu and GDSS

galamawa across the state Babandoki Gen. Enterp Nig Ltd Across the state 67,198,406.92 67,198,406.92 24/12/2019 12 weeks On-going

131

Feeding of 287 Boarding School students at bamaina academy in birnin

kudu LGA (2019 MOEST Capital Projects)LOT-39 Kabiru na Malam Nig Ltd B/kudu 40,204,006.00 40,204,006.00 23/12/2019 40 weeks On-going

132

Procurement of science laboratory equipments for distribution to 9No.

Senior secondary schols upgraded to science centre of exlence core-2 at

GGUSS Malammadori, GDSS G/Gabas, GGSS garki, GDSS gwuiwa, GUSS

aujara, GUSS maigatari, GUSS tsohuwar gwaram, GC birnin Kudu, and GUSS

basirka accross the state Quest Ventures Ltd Across the state 81,037,103.92 81,037,103.92 24/12/2019 8 weeks On-going

133

Supervision of the construction works at jigawa college of remedials and

advance studies (JICORAS) babura, Lot-6 (3rd and 4th quarters 2019

capital projects) Apex Design & Associates Babura 23,537,374.82 23,537,374.82 27/11/2019 24 Weeks On-going

134

Constr, of 1No. Block of 2 Classroom islamiyya Each (2019 first Quarter

Constituency Projects) Lot-14c at harazimiyya islamiyya in hadejia

Constituency. Alh. Umaru Babandoki Nig Ltd Hadejia 8,055,821.00 8,055,821.00 27/11/2019 8 weeks On-going

135

Constr, of 1No. Block of 2 Classroom islamiyya Each (2019 first Quarter

Constituency Projects) Lot-5 at hayatul islam and kabal in Jahun

Constituency. Sasco Multi Serv Nig Ltd Jahun 6,218,492.70 6,218,492.70 27/11/2019 8 weeks On-going

136

Constr, of 1No. Block of 2 Classroom islamiyya Each (2019 first Quarter

Phase II Constituency Projects) Lot-2 at rukumi in malam madori

Constituency. Mai Mai Blocks Ind. Nig. Ltd M/madori 3,473,316.00 3,473,316.00 11/12/2019 8 weeks On-going

137

Constr. Of 1No. Block of science Laboratory at GDSS Dan sure in roni LGA

(2019 MOEST capital Project) Lot-1 Na'ayi Resources Nig Ltd Roni 9,561,049.80 9,561,049.80 6/12/2019 8 weeks On-going

138

Constr. Administrative block at jigawa college of remedial and advance

studies (JICORAS) Babura, Lot-1 (3rd & 4th quarter 2019 capital projects) Ngaloma Constr Nig Ltd Babura 83,365,963.69 83,365,963.69 27/11/2019 24 Weeks On-going

139

Constr. Of wall fencing at jigawa college of remedial and advance studies

(JICORAS) Babura, Lot-2 (3rd & 4th quarter 2019 capital projects) Ngaloma Constr Nig Ltd Babura 131,969,392.51 131,969,392.51 27/11/2019 24 Weeks On-going

140

Feeding of 209 Boarding school students at Tsangaya school gantsa in

bujiLocal Government Area (2019 MOEST Capital project) Lot-38 Zai General Ent. Buji 8,762,692.80 8,762,692.80 23/12/2019 40 weeks On-going

141

Feeding of 2,416 Boarding school students at GUCSS Dutse in Dutse Local

Government Area (2019 MOEST Capital project) Lot-35 Zai General Ent. Dutse 91,320,405.20 91,320,405.20 23/12/2019 40 weeks On-going

142

Constr, of 1No. Block of 2 Classroom islamiyya Each (2019 first Quarter

Phase II Constituency Projects) Lot-21 at Ung. Kalgo, Kuda Walawa and

Bade Fulani in Yankwashi Constituency. Granitoids Engr Services ltd Yankwashi 9,339,771.12 9,339,771.12 11/12/2019 8 weeks On-going

143

Feeding of 1,696 Boarding school students at GUC Birnin kudu in birnin

kudu Local Government Area (2019 MOEST Capital project) Lot-2 Muduka General Ent. B/kudu 64,105,950.80 64,105,950.80 23/12/2019 40 weeks On-going

144

Ren. Of Windstorm Damaged Structures at GSTC Karkarna, SSS K/Hausa

and GSSS Jahun across the state (2019 MOEST Capital Projects) Allah Abin Godiya Nig Ltd Across the state 35,803,002.26 35,803,003.26 24/12/2019 8 weeks On-going

145

Constr of 1no. Block of 2-classroom islamiyya school each Lot-9 (first qtr.

2019 constituency project) at Babura k/Arewa and Garin Baki in Babura

Constituency. Mufabamex Concept Ltd. Babura 6,391,877.10 6,391,877.10 27/11/2019 7 weeks On-going

TOTAL 11,746,570,838.92 12,247,504,358.77

4i

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 11,746,570,838.92 12,247,504,358.77

146

constr of 1no. Block of 2-Classroom islamiyya school each ( 2019 first

quarter phase 2 Constituency projects) Lot-8 at Dansama , Gangara, M.

Yaro and Garin Baki in Maigatari Constituency, Mai-Mai Block Ind. Ni g Ltd Maigatari 9,310,318.35 9,310,318.35 27/11/2019 9 weeks On-going

147

Constr of 1no. Block of 2-Classroom islamiyya school each ( 2019 first

quarter phase 2 Constituency projects) Lot-3A at Bukari and Aimas Kuka in

Auyo Constituency Mai-Mai Block Ind. Ni g Ltd Auyo 6,226,518.18 6,226,518.18 27/11/2019 12 weeks On-going

TOTAL 11,762,107,675.45 12,263,041,195.30

4j

Ministry of Land

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT (N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

1

Construction of (30NO.) Boys Quarters, External Electrification

and Water supply to individual Legislator's Quarters at Disina

in Dutse L.G.A. Gerawa Global Engr. Dutse 812,600,502.00 812,600,502.00 723,720,196.50 17/10/2018 32 weeks 89 On-going

2

Consultancy services for the supervision of the construction of

30no. Boys Qtrs., Ext. Electrification and Water Supply at

Legislative Qtrs., Dutse HAG Eng. Ltd. Dutse 47,049,676.58 47,049,676.58 42,948,768.82 9/1/2019 32 w eeks 91 On-going

3

Construction of 1No. Block of 4No. House of 2No. Bedroom Smi-

Detach at Gumel Locl Government Area Yalwa Oil & Gas Ltd Gumel 10,773,337.15 10,773,337.15 9,787,707.10 19/3/2019 14 Weeks 92 On-going

4

Construction of 1No. Block of 4No. House of 2No. Bedroom Smi-

Detach at Ringim Locl Government Area Al-Sabur Global Links Ringim 10,779,821.20 10,779,821.20 8,737,582.35 19/3/2019 14 Weeks 82 On-going

5

Construction of 1No Block of 4No House of 2No Bedroom Semi-

Detach at Babura Local Government Area Yalwa Oil & Gas Ltd Babura 10,773,337.15 10,773,337.15 9,987,707.10 19/3/2019 14 Weeks 92 On-going

6

Construction of 1no Block of 4No House of 2No Bedroom Semi-

Detach (lot-2) at Birnin Kudu Local Government Area

Babandoki General

Enterprises B/Kudu 10,651,650.00 10,651,650.00 19/3/2019 14 Weeks On-going

7

Construction of 1No Block of 4No House of 2No Bedroom Semi-

Detach (Lot-4) at Dutse Local government Area Loyalty Properties Ltd Dutse 10,582,286.69 10,582,286.69 5,677,764.75 19/3/2019 14 Weeks 54 On-going

TOTAL 913,210,610.77 913,210,610.77

Ministry of Commerce

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT AMOUNT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

1 Constr. of (3.5km) Culverts & Drainage at Sara Market Beefar Constr. Nig. Ltd. Gwaram 76,329,801.45 76,329,801.45 59,864,067.40 22/11/2012 3 months 78 Stalled

2 Extension of road works at Maigatari Border Free Zone Beefar Constr. Nig. Ltd. Maigatari 37,677,600.00 37,677,600.00 11,259,724.00 11/12/2012 20 weeks 30 Stalled

3

Consultancy serv ices for the Constr. of Drainages at Sara,

Maigatari + Gujungu markets Stirling Dev. Ltd. State 19,140,670.57 19,140,670.57 16,621,973.19 14/10/12 6 months 90 Stalled

Total 133,148,072.02 133,148,072.02

Dutse Capital Development Authority

P OST C ON T R A C T P R OJEC T EVA LUA T ION

S/ N P R OJEC T EXEC UT OR LOC A T ION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. ST A T US R EM A R KS

AMOUNT CONTRACT SUM (N) C ER T IF IED WOR K D A T E P ER IOD IN %

1 Constr. of Dutse tow nship road (15 & 20) Dantata & Saw oe Dutse 760,653,932.06 760,653,932.06 540,282,932.70 20/12/12 16 w eeks 73 Stalled

2 Rehab. Of Dutse Tow nship road phase II (10.110km) CGC Nig. Ltd. Dutse 2,129,872,584.00 3,173,304,408.80 2,688,981,022.36 8/11/2012 14 months 82 Stalled

3 Rehab. Of Dutse Tow nship road phase I (1.250km) CGC Nig. Ltd. Dutse 487,164,968.00 972,442,157.57 812,016,426.23 8/11/2012 14 months 83 Stalled

4 Re-dualisation of Old Police H/qtrs-Gadadin road (2.55km) Dantata & Saw oe Dutse 1,487,873,351.19 1,487,873,351.19 922,979,632.16 11/4/2013 6 months 62 On-going

5 Dualisation of Ibrahim Aliy u road (Dutse Eastern By e-pass) (5.65km) Dantata & Saw oe Dutse 2,861,812,037.79 3,160,794,816.68 2,512,869,594.04 11/4/2013 9 months 83 On-going

6

Constr. Of Streetlights on Dutse township roads (17.576KM) phase I

& II CGC Nig. Limited Dutse 666,041,660.55 666,041,660.55 543,723,853.77 9/9/2013 16 weeks 85 Stalled

7

Constr. Of Access road (1.92KM) at the New House of Assembly

Members Qtrs. Disina, Dutse CGC Nig. Limited Dutse 419,305,302.03 419,305,302.03 303,493,140.29 19/9/2013 5 months 73 Stalled

8 Constr. Of River Re- Alignment project at Dutse, phase 1 (2KM) Dantata & Sawoe Dutse 1,999,219,676.02 1,999,219,676.02 803,044,623.06 26/9/2013 6 months 40 On-going

9

Landscaping and External works at new Jigawa State

Broadcasting Complex Dantata & Sawoe Dutse 657,635,647.36 657,635,647.36 457,989,460.07 31/3/2014 6 months 66 Stalled

TOTAL 11,469,579,159.00 13,297,270,952.26

Cabinet Office

POST CONTRACT PROJECT EVALUATION

S/ N P R OJEC T EXEC UT OR LOC A T ION C ON T R A C T R EVISED VA LUE OF C OM M EN C EM EN TC OM P L. ST A T US R EM A R KS

A M OUN T (N ) C ON T R A C T SUM (N ) C ER T IF IED WOR K D A T E P ER IOD IN %

1 Upgrading and Renov ation of Jigaw a State Gov ernor's Lodge Kano Anhas Nig. LTD Kano 123,614,216.81 123,614,216.81 97,062,788.87 5/11/2013 9 Months 78 On-going

2

Commissioning as Consultant on the Superv ision of the Upgrading

and Renov . of Gov ernor's Lodge Kano Design+ Consultant LTD Kano 10,097,505.90 10,097,505.90 6,555,808.21 19/11/2013 9 Months 75 On-going

3

Constr. of Juma'at Prayer Mosque at Kukuma yamma and

Gubabiya in Buji Constituency. Loyalty Properties Nig. Ldt. Buji 5,613,871.72 5,613,871.72 24/01/2017 6 weeks Stalled

4

Constr. of Five (5) Daily Prayer Mosques at Dawan gawo and

Karkarna in Yankwashi Constituency. Granitoids Eng. Services Yankwashi 6,148,095.00 6,148,095.00 3,267,402.13 16/10/2017 6 weeks 53 On-going

5

Construction of Five (5) daily Prayer Mosques at

Makwarawa(Tofa Ward) and Dabi (Dabi ward) in Ringim

Constituency. Prestige Intgrt. Serv. Ringim 4,129,061.98 4,129,061.98 18/12/2017 6 Weeks Stalled

6

Renov/Completion of 1no. Juma'at prayer mosque 2017

constituency projects phase III Remaining works (Lot-1) at

Garki Jibwis in Garki Constituency. JAG & H Integrated Garki 10,088,567.00 10,088,567.00 16/4/218 12 weeks On-going

7

Completion/Renovation of 1no. Daily prayer mosques (2019

first quarter constituency projects) Lot-92 at Turkushawa in

Sule Tankarkar Constituency. Modang Invest. Ltd. S/tankarkar 2,625,238.18 2,625,238.18 17/12/2019 8 weeks On-going

8

Constr of (3no.) five Daily Prayer Mosques 2018 Constituency

Projects (Lot-19) at Nasarawa, Dubantu and Walawa Matsaro

in Hadejia Constituency. Alh. Umaru Babandoki Hadejia 5,735,858.70 5,735,858.70 10/10/2018 6 weeks On-going

9

Construction of (1NO.) Five Daily Prayer Mosque 2018

Constituency Projects (Lot-12) at Gusau in Gumel

Constituency. Jag&H Intgrated Services Gumel 1,882,927.00 1,882,927.00 10/10/2018 6 weeks On-going

10

Construction of (3NO.) Five Daily Prayer Mosque 2018

Constituency Projects (Lot-29) at Santerbi Gari, Chakindi Gari

and Sule Bakin Titi in Sule Tankarkar Constituency. Lautai Genaral Investment S/Tankarkar 5,763,123.45 5,763,123.45 3,746,645.70 10/10/2018 6 weeks 60 On-going

11

Construction of District Head Residence 2018 Constituency

projects (Lot 1) at Tsohuwar Gwaram in Gwaraam

Constituency A.G.A. Kilawa Nig. Ltd. Gwaraam 55,264,747.00 55,264,747.00 18,777,191.37 10/10/2018 6 weeks 34 On-going

12

Construction of (4NO.) five Daily Prayer Mosques 2018

Constituency Projects (Lot-18) at Zangon Kanya, Alagarno,

Luggai and Tsagaiwal in Bulangu Constituency, Kafin Hausa

Local Government Area. Kawu Nig. Ltd. K/Hausa 7,843,906.50 7,843,906.50 14/11/2018 8 weeks On-going

BAL. C/F 238,807,119.24 238,807,119.24

8a

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENTC OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 238,807,119.24 238,807,119.24

13

Completion/Renovation of (1NO.) Friday Prayer Mosque 2018

Constituency Projects (Lot-55) at Marken Biki in Babura

Constituency. Danfatu & Sons Nig. Ltd. Babura 1,577,938.00 1,577,938.00 14/11/2018 8 weeks On-going

14

Completion/Renovation of (1NO.) Friday Prayer Mosque 2018

Constituency Projects at Suga Town in Kirikasamma

Constituency. Murat Construction Company K/kasamma 8,439,582.90 8,439,582.90 7,559,671.35 14/11/2018 8 weeks 85 On-going

15

Construction of (2NO.) Friday Prayer Mosque 2018

Constituency Projects (Lot-33) at Dagilibani and Matara

Babba in Birniwa Constituency. Amm Manzo Nig. Ltd. Birniwa 10,008,223.63 10,008,223.63 14/11/2018 12 weeks On-going

16

Construction of the (1 No.) Friday Prayer Mosque (2018 Phase

III) Constituency Projects (Lot-67) at Gada Yamma in Kazaure

Constituency. Yanduna Ventures Nig. Ltd. Kazaure 3,268,000.00 3,268,000.00 23/11/2018 8 weeks On-going

17

Construction of the (1 No.) Friday Prayer Mosque (2018 Phase

III) Constituency Projects (Lot-36) at Jansa in Babura

Constituency. Mufabamex Concept Ltd. Babura 1,910,001.00 1,910,001.00 23/11/2018 6 weeks On-going

18

Construction of the (1 No.) Friday Prayer Mosque (2018 Phase

III) Constituency Projects (Lot-35) at Masko in Babura

Constituency. Mufabamex Concept Ltd. Babura 3,002,226.00 3,002,226.00 23/11/2018 6 weeks On-going

19

Construction of the (1 No.) Friday Prayer Mosque (2018 Phase

III) Constituency Projects (Lot-46) at Tsigi in Jahun

Constituency. Khairussabah Nig. Ltd. Jahun 3,102,667.92 3,102,667.92 23/11/2018 8 weeks On-going

20

Construction of the (1 No.) Friday Prayer Mosque (2018 Phase

III) Constituency Projects (Lot-59) at Gatafa and Shinge in

Auyo Constituency. Nushe Business Resources Auyo 10,520,922.00 10,520,922.00 23/11/2018 8 weeks On-going

21

Construction of the (1 No.) Friday Prayer Mosque (2018 Phase

III) Constituency Projects at Kalagari in Kiyawa Constituency. Demastbo Ventures Ltd. Kiyawa 10,620,617.35 10,620,617.35 23/11/2018 8 weeks On-going

22

Completion/Renovation of (1 No.) Friday Prayer Mosques

2018 Constituency Projects (Lot-57) at Ganji in Fagam

Constituency. Kawu Nig. Ltd. Gwaram 11,000,088.92 11,000,088.92 14/11/2018 8 weeks On-going

23

Completion/Renovation of (1 No.) Friday Prayer Mosques

2018 Constituency Projects (Lot-55) at Marken Biki in

Babura Constituency. Danfatu & Sons Nig. Ltd. Babura 3,577,938.00 3,577,938.00 14/11/2018 8 weeks On-going

BAL. C/F 305,835,324.96 305,835,324.96

8b

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENTC OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 305,835,324.96 305,835,324.96

24

Construction of Interloking tiles and External Works at Garki

Central Mosque (2018 Phase II) Constituency Projects (Lot-

44) at Garki Central Mosque in Garki Constituency. MMZ Garki Construction Nig. Garki 7,642,374.33 7,642,374.33 23/11/2018 8 weeks On-going

25

Construction of the (2 No.) Friday Prayer Mosque (2018 Phase

II) Constituency Projects (Lot-...) at Buro and Fadi Burgi

Towns in Fagam Constituency. G.M. Sara & Sons Ltd. Gwaram 10,700,387.08 10,700,387.08 23/11/2018 8 weeks On-going

26

Construction of (3 No.) Five Daily Prayer Mosque (2018 Phase

II) Constituency Projects (Lot-27) at Gemu H/Tsohuwa,

Fantagwai and Gangawa in Jahun Constituency. A.G.A. Kilawa Nig. Ltd. Jahun 5,883,803.10 5,883,803.10 2,278,253.25 23/11/2018 6 weeks 39 On-going

27

Construction of (1 No.) Five Daily Prayer Mosque (2018 Phase

II) Constituency Projects (Lot-11) atTudun Wada in Hadejia

Constituency. Muhal Global Concept Ltd. Hadejia 2,276,676.25 2,276,676.25 23/11/2018 8 weeks On-going

28

Construction of (1 No.) Five Daily Prayer Mosque (2018 Phase

III) Constituency Projects (Lot-9) at Lafiyan Kondiko in

Fagam Constituency. Ahmed Maidoya & Sons Nig Gwaram 1,960,892.42 1,960,892.42 23/11/2018 6 weeks On-going

29

Construction of (1 No.) Five Daily Prayer Mosque (2018 Phase

III) Constituency Projects at Ashura Madaki in Jahun

Constituency. Mugin Investment Nig. Ltd. Jahun 1,959,335.00 1,959,335.00 23/11/2018 8 weeks On-going

30

Constr of 2no. Daily prayer mosques (2019 first qtrs.

Constituency projects) Lot-46 at Ruwan Garai and Dansure

Tasha in Roni Constituency. Na'ayi Resources Ltd. Roni 3,919,811.70 3,919,811.70 17/12/2020 8 weeks On-going

31

Construction of (2N0.) Blocks of 2-classroom Islamiyya

school typed 2018 phase II constituency projects (Lot -16) at

kalasu and Kukawa in Fagam constituency. Amm Manzo Nig. Ltd Gwaram 6,222,111.00 6,222,111.00 23/11/2018 8 weeks On-going

32

Construction of (3N0.) Blocks of 2-classroom Islamiyya

school typed and renovation of teachers lodge 2018 phase II

constituency projects (Lot -20) at sayawa, danbando and

kuzunzumi/tsardawa in kanya babba constituency. Deetech Nig Ltd Babura 14,739,389.96 14,739,389.96 23/11/2018 15 weeks On-going

33

Construction of (1N0.) Blocks of 2-classroom Islamiyya

school typed 2018 phase II constituency projects (Lot -6) at

Kwatsatsa in Roni constituency. Na'ayi Resources Ltd Roni 3,115,354.00 3,115,354.00 23/11/2018 10 weeks On-going

34

Construction of wall fencing and Grave yard (2018 phase III)

constituency projects at U/Tudu A. in Kanya Babba

Constituncy. Deetech Nig Ltd Babura 15,576,291.17 15,576,291.17 23/11/2018 8 weeks On-going

BAL. C/F 379,831,750.97 379,831,750.97

8c

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENTC OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 379,831,750.97 379,831,750.97

35

Construction of N.D.L.E.A office (2018 phase II) constituency

projects (lot -74) at Gumel in Gumel Constituncy. Na-bakwai Enterp. Ltd Gumel 14,701,871.63 14,701,871.63 23/11/2018 8 weeks On-going

36

Construction of wall fencing and Grave yard (2018 phase III)

constituency projects (lot -72) at kofar arewa Babura in

Babura Constituncy. mufabamex concept nig ltd Babura 12,752,272.00 12,752,272.00 23/11/2018 8 weeks On-going

37

Completion/Renov. Of (1no.)Friday Prayer Mosque (2018

phase III) Constituency Projects (Lot- ) at Batatsaba in

Kazaure Constituency. Na'ayi Resources Ltd Kazaure 7,821,847.00 7,821,847.00 23/11/2018 6 weeks On-going

38

Construction Of (1no.) five daily Prayer Mosques (2018 phase

II) Constituency Projects (Lot-34) at Gidan alhaji Yakubu in

Roni Constituency. Na'ayi Resources Ltd Roni 1,959,212.85 1,959,212.85 23/11/2018 6 weeks On-going

39

Construction Of (3no.) five daily Prayer Mosques (2018 phase

III) Constituency Projects (Lot-31) at Rauda Y/Dutse,

Karkarna "A" and Jama'ar Gabas Fulani in Yankwashi

Constituency. Granitoids Eng. Nig. Ltd Yankwashi 5,834,168.55 5,834,168.55 23/11/2018 8 weeks On-going

40

Construction Of (2no.) five daily Prayer Mosques (2018 phase

III) Constituency Projects (Lot-) at Nasakari and Danbako in

Garki Constituency. Mugin Inv. Nig ltd Garki 3,918,671.70 3,918,671.70 1,875,335.85 23/11/2018 6 weeks 46 On-going

41

Construction Of (3no.) five daily Prayer Mosques (2018 phase

III) Constituency Projects (Lot-29) at G/karfi, Limamai and

shinkafi in Miga Constituency. Tosarawa Global Nig Ltd Miga 5,884,568.55 5,884,568.55 3,755,045.70 23/11/2018 8 weeks 63 On-going

42

Construction Of (3no.) five daily Prayer Mosques (2018 phase

III) Constituency Projects (Lot-) at Takur Aduwa, Sabuwar

Tasha and Gidan Dugur in Dutse Constituency. H.M Dangara ltd Dutse 5,879,213.55 5,879,213.55 23/11/2018 6 weeks On-going

43

Completion of Magahsala/Janazah Preparation Block, Fencing,

Gate, Landscaping of Vicinity, Installation of Overhead Tanks

and Supply of Ghusal Table and Trolley at Dutse General

Mosque. Equishare Nig. Ltd Dutse 12,332,148.96 12,332,148.96 2,113,524.61 10/12/2018 8 weeks 16 On-going

44

Completion/Renovation of (1 No.) Friday Prayer Mosque

(2018 Phase III) Constituency Projects (Lot-41) at Sagi in

Fagam Constituency. A.G.A. Kilawa Nig. Ltd. Gwaram 5,391,347.85 5,391,347.85 4,668,776.01 23/11/2018 8 weeks On-going

45

Construction of (2 No.) Five Daily Prayer Mosque (2018 Phase

II) Constituency Projects (Lot-28) at Gangawa Yankunama

and H/tsohuwa in Jahun Constituency. A.G.A. Kilawa Nig. Ltd. Jahun 3,920,735.70 3,920,735.70 1,587,633.60 23/11/2018 6 weeks 40 On-going

46

Completion/Renovation of (1 No.) Friday Prayer Mosque

(2018 Phase III) Constituency Projects (Lot-42) at Mana in

Fagam Constituency. A.G.A. Kilawa Nig. Ltd. Gwaram 5,391,347.85 5,391,347.85 23/11/2018 8 weeks On-going

BAL. C/F 465,619,157.16 465,619,157.16

8d

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENTC OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 465,619,157.16 465,619,157.16

47

Construction of (1 No.) Friday Prayer Mosque (2018 Phase

III) Constituency Projects at Kwatamma in Kafin Hausa

Constituency. Mugin Investment Nig. Ltd. K/Hausa 3,996,672.02 3,996,672.02 11/12/2018 8 weeks On-going

48

Wall Fencing of (1No.) Juma'at Prayer Mosque (2018 Phase III)

Constituency Projects at Wurma Town in Dutse Constituency. H.M. Dangara Ltd. Dutse 2,401,479.28 2,401,479.28 13/12/2018 8 weeks On-going

49

Construction of (3No.) Five Daily Prayer Mosques (2018 Phase

III) Constituency Projects at Shabarun Jere, Mailefe Gari and

Kakindi Tsuru in Sule Tankarkar Constituency. A.A. Aljazeera Agro Proc. S/tankarkar 5,884,568.55 5,884,568.55 23/11/2018 6 weeks On-going

50

Completion/Renovation of (1No.) Friday Prayer Mosques

(2018 Phase II) Constituency Projects (Lot-64) at Sabon Garin

Dingaya in Fagam Constituency. A.A. Aljazeera Agro Proc. Gwaram 5,729,567.56 5,729,567.56 27/12/2018 8 weeks On-going

51

Construction of (1No.) Friday Prayer Mosques (2018 Phase III)

Constituency Projects at Chakara in Fagam Constituency. A.A. Aljazeera Agro Proc. Gwaram 5,279,873.00 5,279,873.00 23/12/2018 8 weeks On-going

52

Supply and Installation of Medical equipments to the newly

constructed 31no. BHC across the state. G.M. Sara & Sons Ltd. Across the state 4,129,061.98 4,129,061.98 16/4/2018 6 weeks On-going

53

Partial works (Constr of Main mosque Lower Level Roof Slab)

at K/Hausa Juma'at mosque 2018 2nd Qtr. Constituency

project. Shelterdom Nig. Ltd. K/Hausa 24,584,666.85 24,584,666.85 21,637,096.46 14/9/18 24 w eeks 98 On-going

54

Completion /Renovation of (4No) Friday prayer M osques (2018 Phase

II Constituency Pro jects (lo t-61) at Kwalam Wayu, Bardu and

Yangayami in Taura Constituency Babandoki Gen Entr Taura 22,075,259.57 22,075,259.57 16/1/2019 8 weeks On-going

55

Completion/Renovation of Juma'at Prayer M osques 2017

Constituency Pro jects Phase III Remaining Works (Lot-8) at M aje In

Taura constituency Nushe Business Resouces Taura 11,793,398.14 11,793,398.14 22/1/2019 12 Weeks On-going

56

Construction for the Construction of (1No) Daily Prayer M osque (2018

Phase III) Constituency Pro jects (Lot-46) at Sabon Gari ta Daya and

Renovation of Jabarna juma'at M osque in Jahun Constituency Khairussabah Nig Ltd Jahun 3,102,667.92 3,102,667.92 22/1/2019 8 weeks On-going

57

Renov/Completion of 2no. Friday prayer mosques (2019 first

Quarter constituency projects) Lot_91 at Danmakama and

Dangwanki In Sule Tankarkar Constituency. A.A Aljazeera Agro Proc. Ltd S/tankarkar 7,331,978.53 7,331,978.53 17/12/2019 8 weeks On-going

58

Renov/Completion of 1no. Friday prayer mosques (2019 first

Quarter constituency projects) Lot_82 at Bango in Fagam

Constituency. A.A Aljazeera Agro Proc. Ltd Gwaram 6,202,006.45 6,202,006.45 17/12/2019 8 weeks On-going

BAL. C/F 568,130,357.01 568,130,357.01

8e

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENTC OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 568,130,357.01 568,130,357.01

59

Constr of 3no. Daily Prayer Mosques (2019 First Quarter

Constituency project) Lot - 49 at Butiranawa Fulani, Buduru

nad Fulanin Bayan Zarga in Taura Constituency. Gamdu Multi Purpose Ltd Taura 5,874,753.15 5,874,753.15 17/12/2019 8 weeks On-going

60

Constr of 4no. Daily Prayer Mosques (2019 First Quarter

Constituency project) Lot - 1 at Maro, Katangar Tsamiya,

Guyu, and Tsurufawa in Auyo Constituency. Gamdu Multi Purpose Ltd Auyo 7,833,028.20 7,833,028.20 17/12/2019 8 weeks On-going

61

Constr of 2no. Daily Prayer Mosques (2019 First Quarter

Constituency project) Lot - 24 at Oliya Sararin Rakuma and

Lungum Mutari Dankoli in Hadejia Constituency. Alh. Umaru Baban Doki Nig Ltd Hadejia 8,949,483.00 8,949,483.00 17/12/2019 8 weeks On-going

62

Completion/Renov. 4no. Daily Prayer Mosques (2019 First

Quarter Constituency project) Lot - 57 at Kantin Waje, Tudun

Wada, Unguwar NTA and Yankoli in Hadejia Constituency. Alh. Umaru Baban Doki Nig Ltd Hadejia 10,339,715.08 10,339,715.08 17/12/2019 8 weeks On-going

63

Constr of 3no. Daily Prayer Mosques (2019 First Quarter

Constituency project) Lot - 30 at Jallomi Arewa, Manak and

Kanjiwa in Kaugama Constituency. Alh. Umaru Baban Doki Nig Ltd Kaugama 5,870,866.05 5,870,866.05 17/12/2019 8 weeks On-going

64

Constr of 3no. Daily Prayer Mosques (2019 First Quarter

Constituency project) Lot - 31 atDaneri, Kanoke and Kota in

Kaugama Constituency. Alh. Umaru Baban Doki Nig Ltd Kaugama 5,884,568.55 5,884,568.55 17/12/2019 8 weeks On-going

65

Constr of 1no Friday Prayer Mosque (2019 First Quarter

Constituecy projects) Lot-65 at Yayarin Tukur Yamma In Buji

Constituency Yayarin Tukur Nig Ltd Buji 10,318,579.38 10,318,579.38 17/12/2019 8 weeks On-going

66

Constr of 2no. Daily Prayer Mosques (2019 First Quarter

Constituency project) Lot - 10 at Kabbe, J/mesa and Kore

Bakwarga in Buji Constituency. Yayarin Tukur Nig Ltd Buji 3,920,345.07 3,920,345.07 17/12/2019 8 weeks On-going

67

Constr of 3no. Daily Prayer Mosques (2019 First Quarter

Constituency project) Lot - 9 at U/Malam Amadu Damisa,

Dambazaau Yamma and Kawaya Kudu in Buji Constituency. Yayarin Tukur Nig Ltd Buji 5,880,518.55 5,880,518.55 17/12/2019 8 weeks On-going

68

Constr of 3no. Daily Prayer Mosques (2019 First Quarter

Constituency project) Lot - 21 at Yola Kauye, Unguwar Gandu

and Shema in Gwiwa Constituency. Jignaj Global Contr Ltd Gwiwa 5,884,566.00 5,884,566.00 17/12/2019 8 weeks On-going

69

Constr of 1no. Block of 2-classroom islamiyya school each (

2019 first quarter phase 2 Constituency projects) Lot-21

Dumbi, Yarchidau and Gurjiya in Yankwashi Constituency, Yanduna Venture Nig Ltd Yankwashi 9,339,771.12 9,339,771.12 11/12/2019 12 weeks On-going

BAL. C/F 648,226,551.16 648,226,551.16

8f

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENTC OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 648,226,551.16 648,226,551.16

70

Constr of 1no. Block of 2-classroom islamiyya school each (

2019 first quarter phase 2 Constituency projects) Lot-15 at

Daba, Tsohuwar Jawo, Islamiyya Layin Emilalo and Bayan

Lawan Yarima in Kazaure Constituency, Yanduna Venture Nig Ltd Kazaure 12,427,559.12 12,427,559.12 11/12/2019 10 weeks On-going

71

Constr of 2no. Daily Prayer Mosques (2019 First Quarter

Constituency project) Lot - 48 at Bandakado and Kuka in Sule

Tankarkar Constituency. HM Dagara Ldt S/tankarkar 3,918,215.20 3,918,215.20 17/12/2019 8 weeks On-going

72

Constr of 1no Friday Prayer Mosque (2019 First Quarter

Constituecy projects) Lot-79 at Komai Allah Yayi in Miga

Constituency Amia Integrated Service Nig Ltd Miga 10,200,863.74 10,200,863.74 17/12/2019 8 weeks On-going

73

Constr of 4no. Daily Prayer Mosques (2019 First Quarter

Constituency project) Lot - 40 at Tsohuwar Dalan, Dangoli,

Yandadi and Mazama In Miga Constituency. Barde Global Concept Nig Ltd Miga 7,840,683.40 7,840,683.40 17/12/2019 8 weeks On-going

74

Constr of 2no. Daily Prayer Mosques (2019 First Quarter

Constituency project) Lot - 23 at Faranunbunare and

Borandage in Gwiwa Constituency. Jignaj Global Contr Ltd Gwiwa 3,923,045.70 3,923,045.70 17/12/2019 8 weeks On-going

75

Constr of 3no. Daily Prayer Mosques (2019 First Quarter

Constituency project) Lot - 22 at Ture kwando, Unguwar

Yamma and Z/sainawa G/Dagachi in Gwiwa Constituency. Jignaj Global Contr Ltd Gwiwa 5,884,568.55 5,884,568.55 17/12/2019 8 weeks On-going

76

Compl/Renov of 1no Friday Prayer Mosque (2019 First

Quarter Constituecy projects) Lot-90 at Tasheguwa in

Kirikasamma Constituency Manhaf Global Constr Nig Ltd K/kasamma 7,442,582.78 7,442,582.78 17/12/2019 8 weeks On-going

77

Constr of 3no. Daily Prayer Mosques (2019 First Quarter

Constituency project) Lot - 47 at Tagwayen Kuka, Santarbi and

Chiromawa in Sule Tankarkar Constituency. HM Dagara Ltd. Stankarkar 5,877,322.53 5,877,322.53 17/12/2019 8 weeks On-going

78

Constr of 1no Friday Prayer Mosque (2019 First Quarter

Constituecy projects) Lot-66 at Sabon Garin Rabadi in Fagam

Constituency NBS & Sons Nig Ltd Gwaram 9,171,846.17 9,171,846.17 17/12/2019 8 weeks On-going

79

Constr of 4no. Daily Prayer Mosques (2019 First Quarter

Constituency project) Lots - 16 at galamawa, G/Biredi,

Sabalari, sakwaya and hausawa in Dutse Constituency. Backbone global links ltd Dutse 7,836,430.04 7,836,430.04 11/12/2019 8 weeks On-going

80

Completion/Renov. 3no. Daily Prayer Mosques (2019 First

Quarter Constituency project) Lot - 55 at Kundum, Jar kasa

B/kasuwa Basirka and and bangon fulani in fagam

Constituency. Yayarin Tukur Nig Ltd Gwaram 9,274,972.59 9,274,972.59 17/12/2019 8 weeks On-going

BAL. C/F 732,024,640.98 732,024,640.98

8g

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENTC OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 732,024,640.98 732,024,640.98

81

Installation of solar electrification (2019 first quarter

constituency project) Lot-96 at Digijin and fagam central

mosques in fagam constituency Lines dimensions Nig Ltd Gwaram 4,672,301.71 4,672,301.71 17/12/2019 8 weeks On-going

82

Installation of solar electrification (2019 first quarter

constituency project) Lot-95 at galambi and basirka central

mosques in fagam constituency Lines dimensions Nig Ltd Gwaram 4,478,167.05 4,478,167.05 17/12/2019 8 weeks On-going

83

Construction of 4No. Daily prayer Mosques (2019 first

Quarter constituency projects) Lot- 51 at Dankama, Karkanai,

Burji Fulani and Kuda in Yankwashi Constituency. Granitoids Engr Services ltd Yankwashi 7,836,430.04 7,836,430.04 17/12/2019 8 weeks On-going

84

Constr of 1No. Friday Prayer Mosque (2019 First Quarter

Constituency Projects) Lot-67 at Tsakuran in Fagam

Constituency Isa Halilu Nig. Ltd Gwaram 9,315,820.89 9,315,820.89 17/12/2019 8 weeks On-going

85

Construction of 3No. Daily prayer Mosques (2019 first

Quarter constituency projects) Lot- 5 atYakuda, zazzaugawa

and kwalele in Birnin kudu Constituency. Nushe Bus, Resources Ltd B/kudu 5,881,568.50 5,881,568.50 17/12/2019 8 weeks On-going

86

Construction of 3No. Daily prayer Mosques (2019 first

Quarter constituency projects) Lot- 4 at Kauyen Abuja, Lemo

and Gidan Bello in Birnin kudu Constituency. Nushe Bus, Resources Ltd B/kudu 5,883,340.05 5,883,340.05 17/12/2019 8 weeks On-going

87

Construction of 3No. Daily prayer Mosques (2019 first

Quarter constituency projects) Lot- 3 at Fa'a, Chagu and

Gudalai in Birnin kudu Constituency. Nushe Bus, Resources Ltd B/kudu 5,879,148.00 5,879,148.00 17/12/2019 8 weeks On-going

88

Construction of 2No. Daily prayer Mosques (2019 first

Quarter constituency projects) Lot- 50 at Dkakawar Dinya

and Kangal in Taura Constituency. Dankwara M/jimina Inv. Ltd Taura 3,926,502.10 3,926,502.10 17/12/2019 8 weeks On-going

89

Construction of 1No. Friday prayer Mosques (2019 first

Quarter constituency projects) Lot- 63 at Dirimowa in

Birniwa Constituency. AMM Manzo Nig Ltd Birniwa 10,518,579.33 10,518,579.33 17/12/2019 12 weeks On-going

90

Construction of 3No. Daily prayer Mosques (2019 first

Quarter constituency projects) Lot- 42 at magamar uku miga,

kikatawa miga and rugar rama in miga Constituency. Amia Integ. Serv. Ltd miga 5,880,512.85 5,880,512.85 17/12/2019 8 weeks On-going

91

Construction of 3No. Daily prayer Mosques (2019 first

Quarter constituency projects) Lot- 41 at zangon jigawa

gabas, garin gami and gidan kanya in miga Constituency. Amia Integ. Serv. Ltd miga 5,880,512.55 5,880,512.55 17/12/2019 8 weeks On-going

92

Costraction of 3No. Daily prayer Mosques (2019 first Quarter

constituency projects) Lot- 7 at arobade, mungolo and

kwanar kangire in Birnin Kudu Constituency. Nushe Bus, Resources Ltd B/Kudu 5,874,753.15 5,874,753.15 17/12/2019 8 weeks On-going

BAL. C/F 808,052,277.20 808,052,277.20

8h

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENTC OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 808,052,277.20 808,052,277.20

93

Construction of 3No. Daily prayer Mosques (2019 first

Quarter constituency projects) Lot- 6 at saboru, unguwar

yamma and karfawa in Birnin Kudu Constituency. Nushe Bus, Resources Ltd B/Kudu 5,874,753.15 5,874,753.15 17/12/2019 8 weeKs On-going

94

Construction of 1No. Daily prayer Mosques (2019 first

Quarter constituency projects) Lot- 38 at Garin Malam Ali in

Malammadori Constituency. Ramadan Constr Nig Ltd M/madori 1,961,522.85 1,961,522.85 17/12/2019 8 weeks On-going

95

Construction of 3No. Daily prayer Mosques (2019 first

Quarter constituency projects) Lot- 17 at Kaho, K/Malam

Yahya Basirka and Sabalari in Fagam Constituency, Gwaram

Local Government Area. Ramadan Constr Nig Ltd Gwaram 5,877,322.53 5,877,322.53 17/12/2019 8 weeks On-going

96

Completion/Renovation of 1no. Daily prayer mosques (2019

first quarter constituency projects) Lot-53 at Sabon Layi

K/kudu Iggi in B/kudu Constituency. Modang Invest. Ltd. B/kudu 1,954,613.85 1,954,613.85 17/12/2019 8 weeks On-going

97

Completion/Renovation of 1no. Daily prayer mosques (2019

first quarter constituency projects) Lot-92 at Turkushawa in

Sule Tankarkar Constituency. Modang Invest. Ltd. S/tankarkar 2,625,238.18 2,625,238.18 17/12/2019 8 weeks On-going

98

Construction of 1No. Friday prayer Mosques (2019 first

Quarter constituency projects) Lot- 68 at Malam Baki in

Gagarawa Constituency. AMM Manzo Nig Ltd Gagarawa 10,518,579.38 10,518,579.38 17/12/2019 12 weeks On-going

99

Completion/Renovation of 2No. Daily prayer Mosques (2019

first Quarter Constituncy projects) Lot-54 at Takur site Layin

Yan Kosai and Masajid Matawalle Old Government House

Dutse in Dutse Constituecy. Modang Invest. Ltd Dutse 5,143,163.38 5,143,163.38 17/12/2019 8 weeks On-going

100

Construction of 1No. Friday prayer Mosques (2019 first

Quarter constituency projects) Lot- 69 at Mai-Aduwa in

Gagarawa Constituency. Modang Invest. Ltd Gagarawa 10,518,579.38 10,518,579.38 17/12/2019 8 weeks On-going

101

Contr. of Wall Fence (2019 first quarter Constituecy projects)

Lot- 81 at Dagacheri Juma'at Prayer Mosque in Birniwa

Constituecy. AMM Manzo Nig Ltd Birniwa 3,429,961.13 3,429,961.13 17/12/2019 8 weeks On-going

102

Construction of 1No. Daily prayer Mosques (2019 first

Quarter constituency projects) Lot- 18 at Zango in Gumel

Constituency. farham synergy con. Ltd Gumel 1,958,251.05 1,958,251.05 17/12/2019 4 weeks On-going

103

Construction of 3No. Daily prayer Mosques (2019 first

Quarter constituency projects) Lot- 36 at Fake Cikin Gari,

Shuwarin Gari and Miyawo Tudu in Kiyawa Constituency. Muhal Global Concept Ltd Kiyawa 5,880,518.55 5,880,518.55 17/12/2019 8 weeks On-going

BAL. C/F 863,794,780.63 863,794,780.63

8i

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENTC OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 863,794,780.63 863,794,780.63

104

Construction of 3No. Daily prayer Mosques (2019 first

Quarter constituency projects) Lot- 37 at Majiya, Danfusan

and Kiyawa cikin Gari in Kiyawa Constituency. Muhal Global Concept Ltd Kiyawa 5,880,518.55 5,880,518.55 17/12/2019 8 weeks On-going

105

Constr, of 1No. Block of 2 Classroom islamiyya Each (2019 first

Quarter Phase II Constituency Projects) Lot-5 at Hayatul

Islam and Kabal in Jahun Constituency. Sasco Multi Serv Nig Ltd Jahun 6,218,498.70 6,218,498.70 27/12/2019 9 weeks On-going

106

Construction of 4No. Daily prayer Mosques (2019 first

Quarter constituency projects) Lot- 19 at Jugwa A, Z/Nagogo

G/sarkin aska, Z/Ta Gabas and Girawa in Gwaram

Constituency. JAG & H Intergreted Service Gwaram 7,846,091.40 7,846,091.40 17/12/2019 8 weeks On-going

107

Completion/Renovation of 1No.Friday prayer Mosques (2019

first Quarter Constituncy projects) Lot-89 at Tashar

Dankwmbo in Kanya Constituency in Babura LGA Deetech Nig. Ltd Babura 2,131,685.87 2,131,685.87 17/12/2019 8 weeks On-going

108

Construction of 3No. Daily prayer Mosques (2019 first

Quarter constituency projects) Lot- 45 at Debe kai, Tinti and

Daneji Ringim Constituency. Marb eng. & Multi Serv. Ltd Ringim 5,884,568.55 5,884,568.55 17/12/2019 8 weeks On-going

109

Construction of 4No. Daily prayer Mosques (2019 first

Quarter constituency projects) Lot- 35 at Kulluru, Harbon Mai

Unguwa, katuka cikin Gari and Abarewa in Kiyawa

Constituency. Muhal Global Concept Ltd Kiyawa 7,834,461.60 7,834,461.60 17/12/2019 8 weeks On-going

110

Construction of 3No. Daily prayer Mosques (2019 first

Quarter constituency projects) Lot- 31 at Daneri, Kanoke and

Kota in Kaugama Constituency. Danfatu & sons Nig Ltd Kaugama 5,884,568.55 5,884,568.55 11/12/2019 8 weeks On-going

111

Construction of 1No. Friday prayer Mosques (2019 first

Quarter constituency projects) Lot- 76 at Dankumbo in

Maigatari Constituency. Allah Abin Dogaro Nig Ltd Maigatari 14,500,005.00 14,500,005.00 17/12/2019 12 Weeks On-going

112

Constr. Of JSS Science each (2019 first quarter phase II

constituency projects) LOT-17 at Gumel and Garin Barka in

Gumel constituency. Farham Synergy con. Ltd Gumel 29,908,200.00 29,908,200.00 11/12/2019 18 Weeks On-going

113

Constr. Of 3no. Daily Prayer Mosques (2019 first quarter

constituency projects) LOT-44 at Kwai Kwayu, Kagadama and

Gagarawa in Ringim constituency. Marb eng. & Multi Serv. Ltd Ringim 5,884,568.55 5,884,568.55 17/12/2019 8 Weeks On-going

114

Costr.of 1No. Friday prayer Mosques (2019 first Quarter

constituency projects) Lot- 76 at Ladin Kani in Maigatari

Constituency. Nadada Venture Nig. Ltd Maigatari 7,609,184.60 7,609,184.60 7/12/2019 8 Weeks On-going

BAL. C/F 963,377,132.00 963,377,132.00

8j

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENTC OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 963,377,132.00 963,377,132.00

115

Costr.of 1No. Friday prayer Mosques (2019 first Quarter

constituency projects) Lot- 78 at Jobi in Maigatari

Constituency. Nadada Venture Nig. Ltd Maigatari 7,720,042.25 7,720,042.25 17/12/2019 8 Weeks On-going

116

Costr.of 2No. Friday prayer Mosques (2019 first Quarter

constituency projects) Lot- 88 at Duzau and Danyayi in Kanya

Constituency. Deetech Nig. Ltd Babura 7,029,877.90 7,029,877.90 17/12/2019 8 Weeks On-going

117

Constr. Of 4no. Daily Prayer Mosques (2019 first quarter

constituency projects) LOT-29 at Karfawa, Kanawa, Adigul

and Balladar Kanya constituency in Babura LGA. Deetech Nig. Ltd Babura 7,824,104.04 7,824,104.04 17/12/2019 8 Weeks On-going

118

Constr. of Solar Powered Water Supply Scheme Constituency

Project (2019 PHASE 1) LOT-16 At Dangwabro in Maigatari

Constituency A.S.Maifata Gen. EntP. Ltd Maigatari 6,015,765.00 6,015,765.00 11/12/2019 8 Weeks On-going

119

Constr. Of 2no. Daily Prayer Mosques (2019 first quarter

constituency projects) LOT-39 at Kkama and Kwanar Duniya

in Maigatari constituency Marb eng. & Multi service Nig LtdMaigatari 3,908,555.70 3,908,555.70 17/12/2019 8 Weeks On-going

120

Constr. Of 2no. Daily Prayer Mosques (2019 first quarter

constituency projects) LOT-46 at ruwan garai and dansure

tasha in Roni constituency Na'ayi Resources Nig Ltd Roni 3,919,811.70 3,919,811.70 17/12/2019 8 Weeks On-going

121

Supply of Science Laboratories Equipment for Distribution to

Senior Sec School Across the state (2019 MOEST capital

project) Aldan Project Ltd Across the state 29,491,628.72 29,491,628.72 24/12/2019 8 weeks On-going

122

Constr. Of 3no. Daily Prayer Mosques (2019 first quarter

constituency projects) LOT-12 at gabari, machiba and

shagawa in bulangu constituency Kawu Nigeria Ltd K/Hausa 5,567,369.55 5,567,369.55 17/12/2019 8 Weeks On-going

123

Constr. Of 3no. Daily Prayer Mosques (2019 first quarter

constituency projects) LOT-20 at abena, babban gidan

nahuce and tsangwanwa in gwaram constituency JAG & H Intergreted Service Gwaram 5,880,512.55 5,880,512.55 17/12/2019 8 Weeks On-going

124

Costr.of 1No. Friday prayer Mosques (2019 first Quarter

constituency projects) Lot- 80 at Kaki mai wando in Roni

Constituency. Na'ayi Resources Nig Ltd Roni 9,527,340.25 9,527,340.25 17/12/2019 8 Weeks On-going

125

Constr. Of 3no. Daily Prayer Mosques (2019 first quarter

constituency projects) LOT-14 at kwarin bulama, S/garin

bulangu, mandamari sabuwa in bulangu constituency Kawu Nigeria Ltd K/Hausa 5,842,273.05 5,842,273.05 17/12/2019 8 Weeks On-going

126

Renov. Of 2no. Daily Prayer Mosques (2019 first quarter

constituency projects) LOT-84 at buro and fadi gurje in fagam

constituency Pullad Global Consultant Ltd Gwaram 2,503,688.50 2,503,688.50 17/12/2019 8 Weeks On-going

BAL. C/F 1,058,608,101.21 1,058,608,101.21

8k

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENTC OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 1,058,608,101.21 1,058,608,101.21

127

Constr. Of 3no. Daily Prayer Mosques (2019 first quarter

constituency projects) LOT-11 at turaka, gandu and K/bulama

Waek in bulangu constituency Kawu Nigeria Ltd K/Hausa 5,865,605.55 5,865,605.55 17/12/2019 8 Weeks On-going

128

Costr.of 1No. Friday prayer Mosques (2019 first Quarter

constituency projects) Lot- 76 at Ladin kani in mai gatari

Constituency. Khairushabah Nig Ltd Maigatari 7,609,184.60 7,609,184.60 17/12/2019 8 Weeks On-going

129

Costr.of 1No. Friday prayer Mosques (2019 first Quarter

constituency projects) Lot- 78 at Jobi in maigatari

Constituency. Marb Eng. & Multi serv. Ltd Maigatari 7,720,042.25 7,720,042.25 17/12/2019 8 Weeks On-going

130

Costr.of 1No. Friday prayer Mosques (2019 first Quarter

constituency projects) Lot- 74 at gwalerima in kaugama

Constituency. Danfatu & sons Nig Ltd Kaugama 8,200,007.27 8,200,007.27 17/12/2019 12 weeks On-going

131

Completion./Renovation Of 3no. Daily Prayer Mosques (2019

first quarter constituency projects) LOT-56 at magarya,

sabuwar unguwa and GGSS Garki in Garki constituency MMZ Garki Gen contractor Garki 4,814,329.08 4,814,329.08 17/12/2019 8 Weeks On-going

132

Completion./Renovation Of 3no. Daily Prayer Mosques (2019

first quarter constituency projects) LOT-56 at magarya,

sabuwar unguwa and GGSS Garki in Garki constituency MMZ Garki Gen contractor Garki 4,814,329.08 4,814,329.08 17/12/2019 8 Weeks On-going

133

Completion./Renovation Of 2no. Daily Prayer Mosques (2019

first quarter constituency projects) LOT-52 at argina and

yartsaka in Auyo constituency MMZ Garki Gen contractor Auyo 7,293,833.85 7,293,833.85 17/12/2019 8 Weeks On-going

134

Costr.of 1No. Friday prayer Mosques (2019 first Quarter

constituency projects) Lot- 74 at Ubba in kaugama

Constituency. Danfatu & sons Nig Ltd Kaugama 8,200,007.27 8,200,007.27 17/12/2019 12 weeks On-going

135

Constr. Of 3no. Daily Prayer Mosques (2019 first quarter

constituency projects) LOT-13 at bujaye, makera mashawai in

bulangu constituency Kawu Nigeria Ltd K/Hausa 5,784,568.58 5,784,568.58 17/12/2019 8 Weeks On-going

136

Constr. Of 4no. Daily Prayer Mosques (2019 first quarter

constituency projects) LOT-51 at dankama, karkanai, burji

fulani and kuda in yankwashi constituency Granitoids Engr Services ltd Yankwashi 7,836,430.04 7,836,430.04 17/12/2019 8 Weeks On-going

137

Constr of 4no. Daily prayer mosques (2019 first quarter

constituency projects) Lot-19 at Jugwa A., Z/nagogo G/Sarkin

Aska, Z/Ta gabas and Girawa in Gwaram Constituency. JAG&H Integ. Services Ltd Gwaram 7,846,091.40 7,846,091.40 17/12/2019 8 weeks On-going

TOTAL 1,134,592,530.18 1,134,592,530.18

8L

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENTC OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 1,134,592,530.18 1,134,592,530.18

138

Constr of 1no. Friday prayer mosque (first qtr. 2019

constituency project) Lot-74 at Ubba in Kaugama

Constituency. Danfatu & Sons Nig. Ltd. Kaugama 8,200,007.27 8,200,007.27 17/12/2020 12 weeks On-going

139

Completion /Renovation of 2no. Friday prayer mosques (2019

first qtrs. Constituency projects) Lot-84 at Buro and Fadi

Gurje in Fagam Constituency. Pullad Global Consultant Gwaram 2,503,688.50 2,503,688.50 17/12/2020 8 weeks On-going

140

Completion /Renovation of 2no. Friday prayer mosques (2019

first qtrs. Constituency projects) Lot-83 at JIBWIS Fagam and

Dangulan in Fagam Constituency. Pullad Global Consultant Gwaram 4,668,587.70 4,668,587.70 17/12/2020 8 weeks On-going

141

Completion /Renovation of 3no. Daily prayer mosques (2019

first qtrs. Constituency projects) Lot-56 at Magarya, Sabuwar

Unguwa and GGSS Garki in Garki Constituency. MMZ Garki Gen.Constr Ltd. Garki 4,814,329.08 4,814,329.08 17/12/2020 8 weeks On-going

142

Construction of 3No. Daily prayer Mosques (2019 first

Quarter constituency projects) Lot- 6 at saboru, unguwar

yamma and karfawa in Birnin Kudu Constituency. Nushe Bus, Resources Ltd B/Kudu 5,874,753.15 5,874,753.15 17/12/2019 8 weeKs On-going

143

Construction of 1No. Daily prayer Mosques (2019 first

Quarter constituency projects) Lot- 38 at Garin Malam Ali in

Malammadori Constituency. Ramadan Constr Nig Ltd M/madori 1,961,522.85 1,961,522.85 17/12/2019 8 weeks On-going

144

Construction of 3No. Daily prayer Mosques (2019 first

Quarter constituency projects) Lot- 17 at Kaho, K/Malam

Yahya Basirka and Sabalari in Fagam Constituency, Gwaram

Local Government Area. Ramadan Constr Nig Ltd Gwaram 5,877,322.53 5,877,322.53 17/12/2019 8 weeks On-going

145

Completion/Renovation of 1no. Daily prayer mosques (2019

first quarter constituency projects) Lot-53 at Sabon Layi

K/kudu Iggi in B/kudu Constituency. Modang Invest. Ltd. B/kudu 1,954,613.85 1,954,613.85 17/12/2019 8 weeks On-going

146

Completion/Renovation of 1no. Daily prayer mosques (2019

first quarter constituency projects) Lot-92 at Turkushawa in

Sule Tankarkar Constituency. Modang Invest. Ltd. S/tankarkar 2,625,238.18 2,625,238.18 17/12/2019 8 weeks On-going

TOTAL 1,173,072,593.29 1,173,072,593.29

8m

Ministry of Information

P OST C ON T R A C T P R OJEC T EVA LUA T ION

S/ N P R OJEC T EXEC UT OR LOC A T IONC ON T R A C T A M OUN T R EVISED VA LUE OF C OM M EN C EM EN TC OM P L. ST A T US R EM A R KS

(N ) C ON T R A C T SUM (N ) C ER T IF IED WOR K D A T E P ER IOD IN %

Total - -

Ministry of Agriculture

P OST C ON T R A C T P R OJEC T EVA LUA T ION

S/ N P R OJEC T EXEC UT OR LOC A T IONC ON T R A C T A M OUN T R EVISED VA LUE OF C OM M EN C EM EN TC OM P L. ST A T US R EM A R KS

(N ) C ON T R A C T SUM (N ) C ER T IF IED WOR K D A T E P ER IOD IN %

Total - -

State Universal Basic Education Board

P OST C ON T R A C T P R OJEC T EVA LUA T ION

S/ N P R OJEC T EXEC UT OR LOC A T IONC ON T R A C T A M OUN T R EVISED VA LUE OF C OM M EN C EM EN TC OM P L. ST A T US R EM A R KS

(N ) C ON T R A C T SUM (N ) C ER T IF IED WOR K D A T E P ER IOD IN %

Total - -

Jigawa State Polytechnic

P OST C ON T R A C T P R OJEC T EVA LUA T ION

S/ N P R OJEC T EXEC UT OR LOC A T IONC ON T R A C T A M OUN T R EVISED VA LUE OF C OM M EN C EM EN TC OM P L. ST A T US R EM A R KS

(N ) C ON T R A C T SUM (N ) C ER T IF IED WOR K D A T E P ER IOD IN %

Total - -

Ministry of Justice

P OST C ON T R A C T P R OJEC T EVA LUA T ION

S/ N P R OJEC T EXEC UT OR LOC A T IONC ON T R A C T A M OUN T R EVISED VA LUE OF C OM M EN C EM EN TC OM P L. ST A T US R EM A R KS

(N ) C ON T R A C T SUM (N ) C ER T IF IED WOR K D A T E P ER IOD IN %

Total - -

Ministry of Finance

P OST C ON T R A C T P R OJEC T EVA LUA T ION

S/ N P R OJEC T EXEC UT OR LOC A T ION C ON T R A C T A M OUN T REVISED VA LUE OF C OM M EN C EM EN T C OM P L. ST A T US R EM A R KS

(N ) CONTRACT SUM (N) C ER T IF IED WOR K D A T E P ER IOD IN %

1

Commission/Engagement as Consultant for the Technical

consultants on Softw are Dev . Consulting in the state and

MDAs. (IPSAS) Sparklesoft Solutions Ltd. Dutse 19,710,000.00 19,710,000.00 16,753,528.35 10/28/2016 6 months 85 On-going

2

Engagement as Consultant to Recover all excess and

Cot charges covering the period of April, 2013 to

December, 2015 (at 5% commission). Yolight Limited In the state 14/8/2018 3 months Stalled

3

Consultancy services fees to deliver World class

payment and collection on I.G.R. Ercas Solution Limited In the state 70,016,433.40 24/12/2018 On-going

4

En g a g em en t/Com m ission in g a s

Con su lta n t for th e r econ cilia t ion a n d

r ecov er y of u n r em itted pa y a s y ou ea r n

(PA YE) of Sta ff of Feder a l Gov er n m en t

A g en cies Residin g in Jig a w a Sta te for th e

per iod off 2 002 -2 01 8 (8 % of N

6 ,3 8 3 ,001 ,7 1 5 .5 7 )

Hen r y You n g

A n d Co. In the state 5 6 3 ,1 7 2 ,1 4 4 .01 5 6 3 ,1 7 2 ,1 4 4 .01 2 6 /6 /2 01 9 6 w eeks Termiated

Total 582,882,144.01 582,882,144.01

Agency for Nomadic Education

P OST C ON T R A C T P R OJEC T EVA LUA T ION

S/ N P R OJEC T EXEC UT OR LOC A T IONC ON T R A C T A M OUN T REVISED VA LUE OF C OM M EN C EM EN TC OM P L.ST A T US R EM A R KS

(N ) CONTRACT SUM (N) C ER T IF IED WOR K D A T E P ER IOD IN %

Total - -

Jigawa State College of Islamic and Legal Studies

P OST C ON T R A C T P R OJEC T EVA LUA T ION

S/ N P R OJEC T EXEC UT OR LOC A T IONC ON T R A C T A M OUN T REVISED VA LUE OF C OM M EN C EM EN TC OM P L.ST A T US R EM A R KS

(N ) CONTRACT SUM (N) C ER T IF IED WOR K D A T E P ER IOD IN %

Total - -

Binyaminu Usman Polytecnic Hadejia

P OST C ON T R A C T P R OJEC T EVA LUA T ION

S/ N P R OJEC T EXEC UT OR LOC A T ION C ON T R A C T A M OUN T REVISED VA LUE OF C OM M EN C EM EN T C OM P L. ST A T US R EM A R KS

(N ) CONTRACT SUM (N) C ER T IF IED WOR K D A T E P ER IOD IN %

1

Constr. of Classrooms and Laboratories

complex at Binyaminu Usman Polytechnic,

Hadejia. DAD A.E. Nig. Ltd. Hadejia 82,582,274.72 82,582,274.72 43,106,485.97 5/1/2017 24 weeks 50 Stalled

TOTAL 82,582,274.72 82,582,274.72

Ministry of Environment

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

1

Constr of 2no. Township Gate in Gumel Local

Government Area 2019 third quarter Constituency

projects Gare Invest Nig Ltd Gumel 9,099,121.73 9,099,121.73 24/12/2019 8 weeks On-going

2

Constr of Drainage at Kamfala Town in Malam

Madori LGA 2019 First Quarter Constituency

Project Ramadan Constr Nig Ltd M/madori 12,261,288.37 12,261,288.37 24/12/2019 12 weeks On-going

3

Constr of Drainage at Hammado in Gumel LGA

2019 Third Quarter Constituency Project farham synergy con. Ltd Gumel 6,497,962.62 6,497,962.62 24/12/2019 8 weeks On-going

4

Constr of Drainage at Marakumi Town in Malam

Madori LGA 2019 First Quarter Constituency

Project Meyadi Concept Nig Ltd M/madori 9,923,643.97 9,923,643.97 24/12/2019 12 weeks On-going

5

Constr of Drainage at Kargo Town in Garki LGA

2019 First Quarter Constituency Project Umar Aliyu & Sons Nig Ltd Garki 12,899,602.80 12,899,602.80 24/12/2019 12 weeks On-going

6

Constr of Drainage at Kandahar in HadejiaLGA

2019 First Quarter Constituency Project Tasi'u Muhd Invt Nig Ltd Hadejia 19,286,864.77 19,286,864.77 24/12/2019 12 weeks On-going

7

Constr of Drainage at Dantanoma Quarters in

Gumei LGA 2019 Third Quarter Constituency JAG & H Intergreted Service Gumel 7,223,498.48 7,223,498.48 24/12/2019 12 weeks On-going

8

Constr of Drainage at Dingaya Town In Gwaram

LGA 2019 First Quarter Constituency Project Pullad Global Consultant Nig Ltd Gwaram 16,180,030.57 16,180,030.57 24/12/2019 12 weeks On-going

9

Constr of Drainage at Fake in Kiyawa LGA 2019 2nd

Quarter Constituency Project AGM & Sons Nig Ltd Kiyawa 14,830,841.81 14,830,841.81 13/12/2019 12 weeks On-going

10

Constr of Drainage at Makeral Kirnande in Miga

LGA 2019 1st Quarter Constituency Project A. Barde Global Concopt Ltd Miga 5,341,392.00 5,341,392.00 13/12/2019 8 weeks On-going

11

Constr of Drainage at Lungun Malamai in Hadejia

LGA 2019 1st Quarter Constituency Project Amia Integrated Service Nig Ltd Hadejia 4,118,002.53 4,118,002.53 13/12/2019 8 weeks On-going

12

Constr of Drainage and Culverts at Kukuma Town

in Buji LGA 2019 1st Quarter Constituency Project Yayarin Tukur Nig Ltd Buji 9,749,911.22 9,749,911.22 13/12/2019 12 weeks On-going

13

Laterite filling at Shuwarin Town in Kiyawa LGA

under 3rd Quarter 2018 Constituency Project Khairushabah Nig Ltd Kiyawa 4,193,265.30 4,193,265.30 12/12/2019 8 weeks On-going

Total 131,605,426.17 131,605,426.17

Jigawa College of Education Gumel

P OST C ON T R A C T P R OJEC T EVA LUA T ION

S/ N . P R OJEC T EXEC UT OR LOC A T ION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. ST A T US R EM A R KS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K (N ) D A T E P ER IOD IN %

Total - -

Informatics Institute Kazaure

P OST C ON T R A C T P R OJEC T EVA LUA T ION

S/ N . P R OJEC T EXEC UT OR LOC A T ION CONTRACT REVISED VA LUE OF C OM M EN C EM EN TC OM P L. ST A T US R EM A R KS

AMOUNT CONTRACT SUM (N) C ER T IF IED WOR K D A T E P ER IOD IN %

1Constr of 1no block of hostel (20 rooms) Babandoki Gen. Entp. Kazaure 47,989,101.98 47,989,101.98 43,155,113.32 28/6/2019 12 w eeks 86 On-going

TOTAL 47,989,101.98 47,989,101.98

Head of Service Office

P OST C ON T R A C T P R OJEC T EVA LUA T ION

S/ N . P R OJEC T EXEC UT OR LOC A T ION C ON T R A C T R EVISED VA LUE OF C OM M EN C EM EN TC OM P L. ST A T US R EM A R KS

A M OUN T C ON T R A C T SUM (N ) C ER T IF IED WOR K D A T E P ER IOD IN %

,

TOTAL - -

Government House

P OST C ON T R A C T P R OJEC T EVA LUA T ION

S/ N . P R OJEC T EXEC UT OR LOC A T ION C ON T R A C T R EVISED VA LUE OF C OM M EN C EM EN TC OM P L. ST A T US R EM A R KS

A M OUN T C ON T R A C T SUM (N ) C ER T IF IED WOR K D A T E P ER IOD IN %

,

TOTAL - -

Directorate of Economic Empowerment

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

Total - -

Deputy Governor Office

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

Total - -