District Irrigation Plan (DIP), Jagatsinghpur - Deptt. of Water ...

134
District Irrigation Plan (DIP), Jagatsinghpur

Transcript of District Irrigation Plan (DIP), Jagatsinghpur - Deptt. of Water ...

District Irrigation Plan (DIP), Jagatsinghpur

District Irrigation Plan (DIP), Jagatsinghpur

DISTRICT IRRIGATION PLAN

OF

JAGATSINGHPUR

(ODISHA)

PRADHAN MANTRI KRISHI SINCHAYEE YOJANA

(PMKSY)

MARCH-2016

DISTRICT LEVEL IMPLEMENTATION COMMITTEE

JAGATSINGHPUR, ODISHA

District Irrigation Plan (DIP), Jagatsinghpur

Prepared by:

District Level Implementation Committee, Jagatsinghpur, Odisha

Technical Support by:

ICAR-Indian Institute of Water Management

Bhubaneswar-751023

District Irrigation Plan (DIP), Jagatsinghpur

District Irrigation Plan (DIP), Jagatsinghpur

CONTENTS

Chapter Contents Page No

1

Executive Summary General Information of the District.

1 2

1.1 District Profile 2

1.2 Demography 4

1.3 Biomass and Livestock 5

1.4 Agro-Ecology, Climate, Hydrology and Topography 6

1.5 Soil Profile 7

1.7 Land Use Pattern 7

2 District Water Profile 28

2.1 Area Wise, Crop Wise Irrigation Status 28

2.2 Production and Productivity of Major Crops 28

2.3 Irrigation Based Classification 29

3 Water Availability 37

3.1 Status of Water Availability 37

3.2 Status of Ground Water Availability 37

3.3 Status of Command Area 37

3.4 Existing Type of Irrigation 37

District Irrigation Plan (DIP), Jagatsinghpur

Chapter Contents Page No

4

Water Requirement / Demand

45

4.1 Domestic Water Demand 45

4.2 Crop Water Demand 46

4.3 Livestock Water Demand 55

4.4 Industrial Water Demand 55

4.5 Water Demand for Power Generation 56

4.6 Total Water Demand of the District for Various Sectors 56

4.7 Water Budget 57

5 Strategic Action Plan for Irrigation in district under PMKSY

59

6 Summary 125

District Irrigation Plan (DIP), Jagatsinghpur

List of Tables

Table No. Details Page No.

Table 1.1 General Profile of Jagatsinghpur District 2

Table 1.2 Demography 4

Table 1.3 Biomass and Live stock 6

Table 1.4 Agro-Ecology, Climate, Hydrology and Topography

8

Table 1.5 Soil Profile 9

Table 1.7 Land use pattern of Jagatsinghpur 11

Table 2.1 Area-wise, Crop-wise Irrigation Status (Jagatsinghpur)

30

Table 2.2. Production and Productivity of major Crops (Jagatsinghpur Dist.)

33

Table 2.3 Irrigation based Classification 36

Table 3.1(a) Status of Water Availability (Irrigation Potential available)

38

Table 3.1 (b) Status of Water Availability 38

Table 3.1 (c) Block wise Status of Water Availability 39

Table 3.2 Status of Ground Water Availability 43

Table 3.3 Status of command area 43

Table 3.4 Existing types of Irrigation 44

Table 4.1 Domestic Water Demand 45

Table 4.2 Crop water demand 46

Table 4.3 Livestock Water Demand 55

Table 4.4 Industrial Water Demand 56

Table 4.6 Total Water Demand of the District for Various Sectors

57

Table 4.7 Water Budget 58

Table 5. Strategic Action Plan for Irrigation in district under PMKSY

67

Table 6. Abstract 124

District Irrigation Plan (DIP), Jagatsinghpur

List of Figures

Fig. No Details

Page No.

Fig. 1.1 Map of Jagatsinghpur in Odisha 3

Fig. 1.2 Blocks in Jagatsinghpur district 3

Fig. 1.3 Rural and urban population of Jagatsinghpur dist

5

Fig. 1.4 Categirization of population 5

Fig.1.5 Livestock of Jagatsinghpur 6

Fig 1.6 Soil Resource Map of Jagatsinghpur District 12

Fig. 1.7 Slope Map of Jagatsinghpur District 17

Fig. 1.8 Land use map of Jagatsinghpur Dist. 22

Fig. 1.9 Basin Map of Jagatsinghpur Dist. 27

Fig.5.1 Existing water resource of Jagatsinghpur block (River, canal, drain and water bodies)

59

Fig. 5.2 Existing water resource of Raghunathpur block (River, canal, drain and water bodies)

60

Fig.5.3 Existing water resource of Balikuda block (River, canal, drain and water bodies)

61

Fig.5.4 Existing water resource of Biridi block (River, canal, drain and water bodies)

62

Fig.5.5 Existing water resource of Nuagaon block (River, canal, drain and water bodies)

63

Fig.5.6 Existing water resource of Tirtol block (River, canal, drain and water bodies)

64

Fig. 5.7 Existing water resource of Kujanga block (River, canal, drain and water bodies)

65

Fig.5.8 Existing water resource of Erasama block (River, canal, drain and water bodies)

66

District Irrigation Plan (DIP), Jagatsinghpur Page 1

EXECUTIVE SUMMARY

Jagatsinghpur District is situated in the east cost of Odisha where agriculture is the main stay of the District. About 70% of the total population directly or indirectly depends on agriculture. Rice and pulses (green gram and black gram) is the main crop of this district during Kharif and rabi season respectively. The average annual rainfall of this district is 1514.6 mm with 66 numbers of rainy days. Due to erratic distribution of rainfall, more than 80% rainfall occurs during monsoon season only. Hence kharif irrigated area is around 70%. But during rabi season, maximum area covers under pulses and oilseeds by utilizing available residual moisture or irrigation is not provided to rabi crops due to non availability of required amount of Irrigation water. Hence the production and productivity of rabi crops is very low in the district. Only 35% areas are being irrigated in rabi season. The District is also surrounded by River system the Mahanadi and Paika in North and Devi in the South West. Due to its geographical situation, the district is congenial and prone to occurrence of various natural calamities like flood, draught or cyclone in almost every year. Water logging is the constraint during Kharif due to poor drainage facilities. Hence with the above conditions, district Irrigation Plan (DIP) under Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) is being prepared for creation, development of water resources, strengthening water distribution network and to increase the water use efficiency in the district so that agriculture production and productivity could be enhanced.

Present District Irrigation plans (DIPs) represents planning and implementation of the Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) both for short and long term. This scheme has four programme components, namely, AIBP, Har Khet ko Pani, Per drop more crop and watershed development. The domestic, livestock, irrigation and industrial requirement of water for the district is 2.50 BCM. But at present only 1.64 BCM of water is available from both surface and groundwater resources. By end of 2020 the requirement may increase to 2.85 BCM. Hence, an additional 1.21 BCM of water potential need to be created by 2020. This can be met with planning of three components under PMKSY. At present 300 ha is under micro irrigation and provision is made to increase 1770 ha under the micro irrigation system to horticultural and cash crops so that 2070 ha will be brought under the system. The block wise strategic planning under this scheme is explained in this document. Planning is made for an estimated cost of Rs. 66914.87 Lakhs to increase the irrigation potential by 15797 ha along with improving the available facilities. This will increase the provision of irrigation from the present level of 55.3 % to 70 %.

District Irrigation Plan (DIP), Jagatsinghpur Page 2

C H A P T E R- I

General Information of the District

1.1 District Profile

Jagatsinghpur District is located in the East Cost of Odisha surrounded by

Kendrapara District in North East, Puri District and Bay of Bengal in South, Cuttack District in West and Bay of Bengal in East. This District is situated in between latitude of 20 degree to 21 degree North and longitude of 84 degree to 87 degree 3’ East. The District is also surrounded by river system the Mahanadi and Paika in North and Debi in South West having a Geographical area of 1, 65,970 ha. Jagatsinghpur is one of the most natural disaster-prone districts of costal Odisha This District consists of 08 Blocks, 08 Tahasils, 194 GPs, 02 Municipalities and 1292 revenue villages. The Block wise location details are presented vide table No.1.1 and map 1(a).

TABLE 1.1 General Profile of Jagatsinghpur District

Sl District / Blocks Code Latitude Longitude

Dist: Jagatsingpur 380 19°58’ to 20°23’ N 86°3’ to 86°45’ E

1 Jagatsinghpur block 20° 15' 17.6400'' N 86° 10' 14.2392'' E

2 Raghunathpur block 20° 22' 3.8676'' N 86° 9' 31.1148'' E

3 Balikuda block 20° 8' 28.3848'' N 86° 16' 22.7712'' E

4 Biridi block 20° 20' 8.6712'' N 86° 3' 24.4224'' E

5 Nuagaon block 21° 6' 36.8100'' N 84° 43' 25.3920'' E

6 Tirtol block 20° 18' 12.0456'' N 86° 20' 47.5728'' E

7 Kujanga block 20° 19' 2.7228'' N 86° 31' 38.7912'' E

8 Erasama block 20° 12' 4.8276'' N 86° 24' 9.9576'' E

District Irrigation Plan (DIP), Jagatsinghpur Page 3

Fig 1.1: Jagatsinghpur in India and Odisha map

Fig. 1.2 Blocks in Jagatsinghpur dist.

District Irrigation Plan (DIP), Jagatsinghpur Page 4

1.2 Demography

This is one of the thickly populated districts having total population of 11, 36,971 as per 2011 census with population density of 681 per sq. kilometer area. Out of the total population male, female and children population are 520710, 506012 and 110249 respectively. Similarly, the population of SC, ST and General category are 248152, 7862 and 880957 respectively. The sex ratio is 967 and literacy rate is 87.13 %. The detail Block wise demographic profile of Jagatsinghpur District is presented vide table.1.2

Table 1.2 Demography

Sl No

Name of the Block

No. of GP

No. of

villages

Population SC

Population

ST Popula

tion

General Populati

on

Total No of

households Male Female

Children (_06)

Total

1 Jagatsinghpur 29 166 64869 63833 13265 141967 35193 628 106146 32176

2 Raghunathpur 19 87 38387 37281 7978 83646 20664 1421 61561 19918

3 Balikuda 30 237 75824 74045 15406 165275 33078 260 131937 37856

4 Biridi 21 81 38160 36668 7967 82795 26882 522 55391 19553

5 Naugaon 16 90 35116 35222 7296 77634 14437 263 62934 18878

6 Tirtol 27 249 72604 73237 15259 161100 33247 387 127466 36285

7 Kujanga 27 174 80969 77596 17500 176065 41187 462 134416 38443

8 Erasama 25 210 65684 65273 15316 146273 29514 629 116130 33703

9 Jagatsinghpur(M) 0 20 15781 14991 2859 33631 6783 366 26482 7010

10 Paradeep(M) 0 7 33316 27866 7403 68585 7167 2924 58494 68585

All Blocks 194 1321 520710 506012 110249 1136971 248152 7862 880957 261307

Total District including urban 445037 410881 106871 962789 136399 58691 767699 228315

(Source: Census data,2011)

District Irrigation Plan (DIP), Jagatsinghpur Page 5

Fig. 1.3 Rural and urban population of Jagatsinghpur dist.

Fig. 1.4 Categorization of population

District Irrigation Plan (DIP), Jagatsinghpur Page 6

1.3 Biomass and Livestock The district has a livestock population of 916042 consisting of 4,73,414

poultry, 4300 dogs, 3011 pigs, 119178 goats, 14738 sheeps, 69823 indigenous cow,

143700 hydride cow, 10246 buffalo and 77632 draft animals. Block wise detail live

stock population is presented in table No.1.3

Table 1.3 Biomass and Livestock

Sl Blocks

Small Animals Large Animals Total

Poultry (No.)

Ducks (Nos.)

Pigs (Nos.)

Goats (Nos.)

Sheeps (Nos.)

Indigenous Cow (Nos.)

Hybrid Cow

(Nos.)

Hybrid Buffalo (Nos.)

1 Jagatsinghpur 141342 221 173 21547 3847 4721 25254 590 206036

2 Raghunathpur 94391 139 0 11500 1948 1392 13160 437 127465

3 Balikuda 27954 229 131 20889 872 5615 33078 2509 102423

4 Biridi 76853 24 68 10324 2919 2852 14733 111 114085

5 Naugaon 21012 552 169 14378 1136 2457 16985 1033 64082

6 Tirtol 77402 531 358 20155 2620 15642 16232 2726 147210

7 Kujanga 14662 1648 1738 7989 874 14654 17285 2168 73057

8 Erasama 19798 956 374 12396 522 22490 6973 672 81684

Total 473414 4300 3011 119178 14738 69823 143700 10246

Fig.1.5 Livestock of Jagatsinghpur

District Irrigation Plan (DIP), Jagatsinghpur Page 7

1.4 Agro-Ecology, Climate, Hydrology and Topography

The district is coming under East and South Eastern Coastal Plain agro-ecological zone having normal annual rainfall of 1514.60 mm in 65.5 nos of rainy days. Out of which about 80% of total precipitation received during kharif season (June to September). The maximum temperature is 37.70C during summer and minimum temperature is 11.20C during winter. Generally summer lasts from March to May and winter from October to February. The evapotranspiration during summer, winter and rainy season comes to 587, 772 and 694 mm with cumulative annual value of 2053mm. The detail Block wise agro-ecology, climate, Hydrology and Topography is given below in table No.1.4. Jagatsinghpur is situated over alluvial plains of the river Mahanadi, Kathojodi, Devi, their tributaries and distributaries. The district comprises of two distinct tracts, the first being marshy and swampy strips along with the coast covered with wild growth of reeds and tropical jungle. The second tract covers fertile plain land. Most of rivers like Mahanadi, Alaka, Biluakhai, Hansua, Devi & Paika pass through the district. The huge deposit of silt of rivers has built up the present alluvium tracts at their meeting places with the sea. Due to creation of swamp at the meeting places with the sea, dense jungles have grown up. The district is situated in coastal plain zone as per agro- climatic classification and in deltaic alluvial plains of the river system with numbers of estuaries, creek on the coastal belt. 1.5 Soil Profile The soil of Jagatsinghpur district is categorized into three type’s i.e. laterite, alluvial and saline. The laterite soil is mainly found in Biridi, Raghunathpur and Jagatsinghpur blocks. Similarly the deltaic alluvial soil is found in western side of Nuagaon, Tirtol, Balikuda, Ersama, Raghunathpur and Jagatsinghpur and texture of soil is generally sandy, sandy loam, salty loam, and clay loam to heavy clay. On the whole this alluvial soil is fertile. Another saline inundated soil is found in the part of Kujanga, Balikuda and Ersama blocks of the District, adjacent to the sea. Area under deep alluvial soil is 89700 thousand ha followed by costal saline soils 53700 thousand and laterite soil 20500 thousand respectively. The details of soil type and land slope of the district are presented below in table No.1.5. Soil type of the district is dominated by Mixed gray soil (inseptisols) which covers around 1,10,200 ha (Fig. ). Nearly 127809.25 ha, 172.23 ha and 0.27 ha area of the district lies under land slope of 0-3%, 3-8% and 8-25 %. The soil profile table, Soil profile map and slope map are given in table No.1.5, 1.5 (a) and 1.5 (b) respectively. 1.7 Land Use Pattern

The detail block wise land use pattern of this district presented below in table No.1.7. The district is having a total geographical area of 1,65,970 ha out of which the gross cropped area is 203834 ha. Net sown area is around 104335 ha with cropping intensity of 195%. Total forest cover is around 5825 ha and the waste land is nearly 52958 ha.

District Irrigation Plan (DIP), Jagatsinghpur Page 8

Table : 1.4 Agro-Ecology, Climate, Hydrology and Topography

Name of the Block Block area (ha.)

Normal annual Rainfall

(mm)

Average

Monthly

Rainfall (mm)

No. of Rainy days (No.)

Average weekly Temperature (ºC) Potential Evapo-Transpiration

(PET)

Mean elevation

Period Period

Cumulative Total

Summer (March-May)

Winter (Oct.-Feb.)

Rainy (June-Sept.) Summ

er Winter

Rainy Season

Max Min Max Min Max Min

Jagatsinghpur 18388 1514.6 118.3 69 27 32.50 19.83 28.83 27.25 32.00 587 772 694 2053 559

Raghunathpur 9769 1514.6 87.33 64 27 32.50 19.83 28.83 27.25 32.00 587 772 694 2053 173

Balikuda 28520 1514.6 115.0 59 27 32.50 19.83 28.83 27.25 32.00 587 772 694 2053 8

Biridi 10642 1514.6 116.3 73 27 32.50 19.83 28.83 27.25 32.00 587 772 694 2053 16

Naugaon 11576 1514.6 57.83 56 27 32.50 19.83 28.83 27.25 32.00 587 772 694 2053 8

Tirtol 22543 1514.6 82.83 72 27 32.50 19.83 28.83 27.25 32.00 587 772 694 2053 8

Kujanga 27421 1514.6 93.75 55 27 32.50 19.83 28.83 27.25 32.00 587 772 694 2053 5

Erasama 37111 1514.6 77.58 54 27 32.50 19.83 28.83 27.25 32.00 587 772 694 2053 8

District Irrigation Plan (DIP), Jagatsinghpur Page 9

1.5 Soil Profile

Soil Type Land Slope

Name of the Block

Major Soil Classes Area (ha.)

0-3% (ha.) 3-8% (ha.)

8-25% (ha.)

Jagatsinghpur Mixed Grey Soil (Inceptisols) 12187.76 12167.28 20.49

Unaltered Soils With Coarse Parent Materials (Entisols)

1737.25 1732.96 4.29

Settlement 3299.49

Waterbody 659.04

Raghunathpur Mixed Grey Soil (Inceptisols) 7100.24 7097.13 3.11

Unaltered Soils With Coarse Parent Materials (Entisols)

560.44 560.44

Unclassified Soil ( Like Mud Flats)

236.69 236.69

Settlement 2296.81

Waterbody 779.97

Balikuda Mixed Grey Soil (Inceptisols) 20019.03 20012.71 6.32

Unaltered Soils With Coarse Parent Materials (Entisols)

1532.34 1528.40 3.93

Unclassified Soil( Like Mud Flats)

760.00 742.53 17.47 0.19

Settlement 2675.72

Waterbody 4292.21

Biridi Mixed Grey Soil (Inceptisols) 7577.99 7577.49 0.50

Unaltered Soils With Coarse Parent Materials (Entisols)

268.84 268.84

Unclassified Soil( Like Mud Flats)

164.73 162.58 2.15

Settlement 1854.75

Waterbody 657.91

Naugaon Mixed Grey Soil (Inceptisols) 8430.46 8401.13 29.33

Unaltered Soils With Coarse Parent Materials (Entisols)

338.35 338.35

District Irrigation Plan (DIP), Jagatsinghpur Page 10

Unclassified Soil( Like Mud Flats)

155.48 144.15 11.33

Settlement 1354.44

Waterbody 1324.50

Tirtol Mixed Grey Soil (Inceptisols) 16159.45 16148.70 10.75

Unaltered Soils With Coarse Parent Materials (Entisols)

1270.83 1268.25 2.58

Unclassified Soil( Like Mud Flats)

289.21 289.21

Settlement 3115.31

Waterbody 1180.79

Kujanga Mixed Grey Soil (Inceptisols) 16316.49 16310.19 6.30 0.08

Unaltered Soils With Coarse Parent Materials (Entisols)

1665.44 1659.70 5.74

Unclassified Soil( Like Mud Flats)

1178.50 1170.60 7.90

NA 0.03

Habitation 2518.15

Settlement 2382.88

Waterbody 3521.08

Erasama Mixed Grey Soil (Inceptisols) 22410.91 22400.86 10.05

Unaltered Soils With Coarse Parent Materials (Entisols)

7231.87 7204.06 27.80

Unclassified Soil( Like Mud Flats)

389.19 387.00 2.19

Settlement 1816.84

Waterbody 5088.34

Total 166799.73 127809.25 172.23 0.27

District Irrigation Plan (DIP), Jagatsinghpur Page 11

1.7 Land use pattern

Name of the State : Odisha

Name of District : Jagatsinghpur

Area in ha.

SI. No. Name of the Block No of Gram

Panchayat

No of the villages covered

Total Geographical

Area

Area under Agriculture Area

under Forest

Area under Wasteland

Area under

other uses Gross cropped area (1)

Net sown Area (2)

Area sown more than once (1-2)

Cropping Intensity

(%)

1 Jagatsinghpur 29 166 18388 28928 14411 14517 201% 0 0 3977

2 Raghunathpur 19 87 9769 15991 7942 8049 201% 223 688 916

3 Balikuda 30 237 28520 31626 16103 15523 196% 148 0 12269

4 Biridi 21 81 10642 16223 8208 8015 198% 400 380 1654

5 Naugaon 16 90 11576 17436 9075 8361 192% 0 153 2348

6 Tirtol 27 249 22543 30265 15226 15039 199% 168 816 6333

7 Kujanga 27 174 27421 31161 15564 15597 200% 473 1702 9682

8 Erasama 25 210 37111 32204 17806 14398 181% 1440 2086 15779

Total 194 1294 165970 203834 104335 99499 195% 2852 5825 52958

District Irrigation Plan (DIP), Jagatsinghpur Page 12

Fig. 1.6 Soil map of Jagatsinghpur

District Irrigation Plan (DIP), Jagatsinghpur Page 13

District Irrigation Plan (DIP), Jagatsinghpur Page 14

District Irrigation Plan (DIP), Jagatsinghpur Page 15

District Irrigation Plan (DIP), Jagatsinghpur Page 16

District Irrigation Plan (DIP), Jagatsinghpur Page 17

Fig.1.7 Slope map of Jagatsinghpur

District Irrigation Plan (DIP), Jagatsinghpur Page 18

District Irrigation Plan (DIP), Jagatsinghpur Page 19

District Irrigation Plan (DIP), Jagatsinghpur Page 20

District Irrigation Plan (DIP), Jagatsinghpur Page 21

District Irrigation Plan (DIP), Jagatsinghpur Page 22

Fig. 1.8 land use, land cover map of Jagatsinghpur

District Irrigation Plan (DIP), Jagatsinghpur Page 23

District Irrigation Plan (DIP), Jagatsinghpur Page 24

District Irrigation Plan (DIP), Jagatsinghpur Page 25

District Irrigation Plan (DIP), Jagatsinghpur Page 26

District Irrigation Plan (DIP), Jagatsinghpur Page 27

1.9 Basin Map of Jagatsinghpur District.

District Irrigation Plan (DIP), Jagatsinghpur Page 28

C H A P T E R- II

District Water Profile

2.1 Area wise crop wise irrigation status

Jagatsinghpur district is one of the thickly populated costal districts of Odisha

and main stream of economy comes from agriculture. As per Agro climatic Condition,

the entire Jagatsinghpur District comes under, East and South Eastern Coastal plain

with hot and humid climates having average normal Rainfall 1521.16 mm. More than

75% of the precipitation is concentrated over five months i.e. from June to October.

Out of total irrigated area of 104335 ha in kharif season, 73955 ha (70%) is being

irrigated whereas in rabi season out of 99480 ha rabi irrigated areas, only 34796 ha

(35%) is being irrigated till date.

The district is webbed by a network of rivers and plains of the entire district lie in

between River Mahanadi in the north and Devi-Biluakhai in the south. During rains

the river and its branches carry great volume of water in them and at the time of high

floods they try to overflow their banks. Jagatsinghpur is having two main canals i.e.

Taladanda & Machhagaon which are chief sources of irrigation in the district. The

details of cropped area and the irrigation status are presented in table No.2.1.

It is well acknowledged that associated with irrigation, there is the problem of water

logging in the command area which not only reduces agricultural production but also

poses a threat to the environment. The problem further aggravates with topographic,

geographic and meteorological factors coupled with other human activities, viz

encroachment of the natural drainage paths, injudicious use of irrigation water,

development of infrastructure on flood prone zones etc. So the long term

sustainability needs not only the optimal utilization of water resources and

management of water resources infrastructures but also development of good

drainage to curb the problem of water logging and consequent development of

agricultural development.

District Irrigation Plan (DIP), Jagatsinghpur Page 29

So far the Jagatsinghpur district is concerned; water logging has great impact upon

the socio economic status of the district because still the economics of the district is

agrarian with major command lying in the coastal belt. To overcome the difficulties in

poor drainage of rain and flood water and retrieval of the water logged area in

Jagatsinghpur with a view to increasing the agricultural production, drainage should

also given priority. Remedial measures for which renovation of major drains and

lateral drains needs periodic investment on operation and maintenance, dredging of

outfall points at regular intervals for effective functioning of the system.

2.2 Production and productivity of major crops

The total landmass area of Jagatsinghpur district is 172240 hects, out of which

91162 hectors of land was net area shown in the year 2010-11. The major crops

grown in the district is paddy and Mung, Biri, groundnut, jute sugarcane, Kulthi, Til,

ragi, potato, mustard etc. Around 5458 hectors of land is covered with forests and

2350 hectors of land has been used for misc. trees and groves. Cropping activities

can go on throughout the year in Odisha provided irrigation facilities are available for

crops. The production and productivity of major category of crops both in irrigated

and rainfed areas are given below in table No.2.2

2.3 Irrigation based Classification

The district has a gross irrigated area of 108751 ha and net irrigated area is 34796

ha and non-irrigated area is 30380 ha during Kharif and 69539 ha during rabi. The

details block wise irrigation based classification is given in table No.2.3.

District Irrigation Plan (DIP), Jagatsinghpur Page 30

2.1 Area-wise, Crop-wise Irrigation Status Source: Department of Agriculture, Agriculture Statistic of State, Agristat,2014-15

Name of the State: Odisha

Name of the District: Jagatsinghpur

Name of the Block

Crop Type Kharif (Area in ha) Rabi Area in ha Summer Crop (Area in ha) Total (Area in ha

Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total

Jag

ats

ing

hp

ur

A) Cereals 10950 286 11236 34 0 34 0 0 0 10984 286 11270

B) Coarse Cereals 0 0 0 0 0 0 0 0 0 0 0 0

C) Pulses 0 20 20 33 8597 8630 0 0 0 33 8617 8650

D) Oil Seeds 0 1 1 55 737 792 0 0 0 55 738 793

E) Fibre 0 10 10 0 0 0 0 0 0 0 10 10

F) Any other crops... 2578 550 3128 4062 0 4062 1015 0 1015 7655 550 8205

Total of the Block 13528 867 14395 4184 9334 13518 1015 0 1015 18727 10201 28928

Rag

hu

nath

pu

r

A) Cereals 6425 510 6935 75 0 75 0 0 0 6500 510 7010

B) Coarse Cereals 0 0 0 0 0 0 0 0 0 0 0 0

C) Pulses 0 11 11 33 4822 4855 0 0 0 33 4833 4866

D) Oil Seeds 0 1 1 46 337 383 0 0 0 46 338 384

E) Fibre 0 10 10 0 0 0 0 0 0 0 10 10

F) Any other crops... 920 119 1039 2146 0 2146 536 0 536 3602 119 3721

Total of the Block 7345 651 7996 2300 5159 7459 536 0 536 10181 5810 15991

Baliku

da

A) Cereals 11216 2132 13348 35 0 35 0 0 0 11251 2132 13383

B) Coarse Cereals 0 0 0 0 0 0 0 0 0 0 0 0

C) Pulses 0 17 17 36 9525 9561 0 0 0 36 9542 9578

D) Oil Seeds 0 1 1 108 427 535 0 0 0 108 428 536

E) Fibre 0 9 9 0 0 0 0 0 0 0 9 9

F) Any other crops... 1690 1004 2694 4341 0 4341 1085 0 1085 7116 1004 8120

Total of the Block 12906 3163 16069 4520 9952 14472 1085 0 1085 18511 13115 31626

District Irrigation Plan (DIP), Jagatsinghpur Page 31

Name of the Block

Crop Type Kharif (Area in ha) Rabi Area in ha Summer Crop (Area in ha) Total (Area in ha

Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total

Bir

idi

A) Cereals 5728 297 6025 26 0 26 0 0 0 5754 297 6051

B) Coarse Cereals 0 0 0 0 0 0 0 0 0 0 0 0

C) Pulses 0 9 9 65 4379 4444 0 0 0 65 4388 4453

D) Oil Seeds 0 2 2 53 464 517 0 0 0 53 466 519

E) Fibre 0 10 10 0 0 0 0 0 0 0 10 10

F) Any other crops... 1830 265 2095 2476 0 2476 619 0 619 4925 265 5190

Total of the Block 7558 583 8141 2620 4843 7463 619 0 619 10797 5426 16223

Nau

gao

n

A) Cereals 2300 4814 7114 97 0 97 0 0 0 2397 4814 7211

B) Coarse Cereals 0 0 0 0 0 0 0 0 0

C) Pulses 0 8 8 43 3212 3255 0 0 0 43 3220 3263

D) Oil Seeds 0 0 0 95 2642 2737 0 0 0 95 2642 2737

E) Fibre 9 9 0 0 0 0 0 0 0 9 9

F) Any other crops... 1334 590 1924 1834 0 1834 458 0 458 3626 590 4216

Total of the Block 3634 5421 9055 2069 5854 7923 458 0 458 6161 11275 17436

Tir

tol

A) Cereals 11429 1466 12895 27 0 27 0 0 0 11456 1466 12922

B) Coarse Cereals 0 0 0 0 0 0 0 0 0 0 0 0

C) Pulses 0 20 20 34 4829 4863 0 0 0 34 4849 4883

D) Oil Seeds 0 2 2 63 1171 1234 0 0 0 63 1173 1236

E) Fibre 0 5 5 0 0 0 0 0 0 0 5 5

F) Any other crops... 1979 433 2412 3446 3600 7046 1761 0 1761 7186 4033 11219

Total of the Block 13408 1926 15334 3570 9600 13170 1761 0 1761 18739 11526 30265

District Irrigation Plan (DIP), Jagatsinghpur Page 32

Name of the Block

Crop Type Kharif (Area in ha) Rabi Area in ha Summer Crop (Area in ha) Total (Area in ha

Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total

Ku

jan

ga

A) Cereals 10057 3468 13525 317 0 317 0 0 0 10374 3468 13842

B) Coarse Cereals 0 0 0 0 0 0 0 0 0 0 0 0

C) Pulses 0 34 34 43 8006 8049 0 0 0 43 8040 8083

D) Oil Seeds 0 2 2 82 3211 3293 0 0 0 82 3213 3295

E) Fibre 0 6 6 0 0 0 0 0 0 0 6 6

F) Any other crops... 1463 706 2169 3013 0 3013 753 0 753 5229 706 5935

Total of the Block 11520 4216 15736 3455 11217 14672 753 0 753 15728 15433 31161

Era

sam

a

A) Cereals 3081 12425 15506 777 0 777 0 0 0 3858 12425 16283

B) Coarse Cereals 0 0 0 0 0 0 0 0 0 0 0 0

C) Pulses 0 29 29 186 8218 8404 0 0 0 186 8247 8433

D) Oil Seeds 0 1 1 60 506 566 0 0 0 60 507 567

E) Fibre 0 8 8 0 0 0 0 0 0 0 8 8

F) Any other crops... 969 1116 2085 3862 0 3862 966 0 966 5797 1116 6913

Total of the Block 4050 13579 17629 4885 8724 13609 966 0 966 9901 22303 32204

Dis

tric

t T

ota

l

A) Cereals 61186 25398 86584 1388 0 1388 0 0 0 62574 25398 87972

B) Coarse Cereals 0 0 0 0 0 0 0 0 0 0 0 0

C) Pulses 0 148 148 473 51588 52061 0 0 0 473 51736 52209

D) Oil Seeds 0 10 10 562 9495 10057 0 0 0 562 9505 10067

E) Fibre 0 67 67 0 0 0 0 0 0 0 67 67

F) Any other crops... 12763 4783 17546 25180 3600 28780 7193 0 7193 45136 8383 53519

Total 73949 30406 104355 27603 64683 92286 7193 0 7193 108745 95089 203834

District Irrigation Plan (DIP), Jagatsinghpur Page 33

2.2 Production and Productivity of major Crops

Name of the Bloc

k

Season

Crop Sown Rainfed Irrigated Total

Cereals

coarse

cereals

pulses

oilseeds

fibre crop

s

Any other crops

Area(ha)

Producttion(Ton/yr

)

Productivity or

Yield(kg/ha)

Cost of Cultivat

on (Rs./ha)

Product! on (Ton /yr)

Productivity (Kgs/h

a)

Cost of Cultivation (Rs./ha)

Product! on (Ton

/yr)

Productivity (Kgs/ha)

Cost of Cultivat

ion (Rs./ha)

Ja

gats

ing

hp

ur A. Kharif 11236 20 1 10 3128 14395 3547 4091 21000 68343 5052 23000 71890 4994.1

B. Rabi 34 8630 792 0 4062 13518 41630 4460.04 22000 19297 4612 24000 60927 4507.1

Summer 0 0 0 0 0 1015 1015 0 0 0 12586 12400 24000 12586 12400 Horticultural & Plantation 0

Total 11270 0 8650 793 10 8205 28928 45177 4429 10022

6 5352 145403 5026.38

Rag

hu

nath

pu

r A. Kharif 6935 11 1 10 1039 7996 3440 5285 21000 42836 5832 23000 46276.29 5787.43

B. Rabi 75 4855 383 0 2146 7459 27471 5324.87 22000 12719 5530 24000 40190 5388.12

Summer 0 0 0 0 0 536 536 0 0 0 6593 12300 24000 6593 12300.4 Horticultural & Plantation

0

Total 7010 0 4866 384 10 3721 15991 30911 5320 62148 6104 93059.29 5819.48

Bali

ku

da

A. Kharif 13348 0 17 1 9 2694 16069 15437 4881 21000 65846 5102 23000 81283.34 5058.39

B. Rabi 35 0 9561 535 0 4341 14472 38489 3867.46 22000 18080 4000 24000 56569 3908.86

Summer 0 0 0 0 0 1085 1085 0 0 0 12803 11800 24000 12803 11800 Horticultural & Plantation

0

Total 13383 0 9578 536 9 8120 31626 53926 4112 96729 5225 150655.3 4763.65

Bir

idi

A. Kharif 6025 0 9 2 10 2095 8141 3022 5183 21000 50896 6734 23000 53917.84 6623

B. Rabi 26 0 4444 517 0 2476 7463 29293 6048.52 22000 16236 6197 24000 45529 6100.63

Summer 0 0 0 0 0 619 619 0 0 0 6685 10800 24000 6685 10799.7 Horticultural & Plantation

0

Total 6051 0 4453 519 10 5190 16223 32315 5956 73817 6837 106131.8 6542.06

District Irrigation Plan (DIP), Jagatsinghpur Page 34

Name of the Bloc

k

Season

Crop Sown Rainfed Irrigated Total

Cereals

coarse

cereals

pulses

oilseeds

fibre crop

s

Any other crops

Area(ha)

Producttion(Ton/yr

)

Productiv ity or

Yield(kg/ha)

Cost of Cultivat

on (Rs./ha)

Product! on (Ton /yr)

Productivity (Kgs/h

a)

Cost of Cultivation (Rs./ha)

Product! on (Ton

/yr)

Productivity (Kgs/ha)

Cost of Cultivat

ion (Rs./ha)

Nau

ga

on

A. Kharif 7114 8 0 9 1924 9055 25657 4733 21000 17679 4865 23000 43336 4785.86

B. Rabi 97 3255 2737 0 1834 7923 26318 4496 22000 9811 4742 24000 36129 4560.02

Summer 0 0 0 0 0 458 458 0 0 0 5313 11600 24000 5313 11600.4

Horticultural & Plantation

0

Total 7211 0 3263 2737 9 4216 17436 51975 4610 32803 5324 84778 4862.24

Tir

tol

A. Kharif 12895 0 20 2 5 2412 15334 6818 3540 21000 57990 4325 23000 64807.75 4226.41

B. Rabi 27 0 4863 1234 0 7046 13170 47009 4897 22000 19089 5347 24000 66098 5018.83

Summer 0 0 0 0 0 1761 1761 0 0 0 21484 12200 24000 21484 12199.9

Horticultural & Plantation

0

Total 12922 0 4883 1236 5 1121

9 30265 53827 4670 98563 5260 152389.7 5035.18

Ku

jan

ga

A. Kharif 13525 0 34 2 6 2169 15736 13485 3198 21000 41092 3567 23000 54576.66 3468.27

B. Rabi 317 0 8049 3293 0 3013 14672 35827 3193.99 22000 11712 3390 24000 47539 3240.12

Summer 0 0 0 0 0 753 753 0 0 0 8961 11900 24000 8961 11900.4

Horticultural & Plantation

0

Total 13842 0 8083 3295 6 5935 31161 49312 3195 61765 3927 111076.7 3564.61

District Irrigation Plan (DIP), Jagatsinghpur Page 35

Name of the Block

Season

Crop Sown Rainfed Irrigated Total

Cereals

coarse

cereals

pulses

oilseeds

fibre crop

s

Any other crops

Area(ha)

Producttion(Ton/yr

)

Productiv ity or

Yield(kg/ha)

Cost of Cultivat

on (Rs./ha)

Product! on (Ton /yr)

Productivity (Kgs/h

a)

Cost of Cultivation (Rs./ha)

Product! on (Ton

/yr)

Productivity (Kgs/ha)

Cost of Cultivat

ion (Rs./ha)

Era

sa

ma

A. Kharif 15506 0 29 1 8 2085 17629 46283 3408 21000 14791 3652 23000 61074.25 3464.42

B. Rabi 777 0 8404 566 0 3862 13609 34351 3937.53 22000 20058 4106 24000 54409 3998.02

Summer 0 0 0 0 0 966 966 0 0 0 11689 12100 24000 11689 12100.4

Horticultural & Plantation

0

Total 16283 0 8433 567 8 6913 32204 80634 3615 46538 4700 127172.3 3948.96

Dis

tric

t T

ota

l

A. Kharif 86584 0 148 10 67 1754

6 10435

5 11768

9 3871 21000

359473

4861 23000 477162.1 4572.49

B. Rabi 1388 0 5206

1 1005

7 0

28780

92286 28038

8 4335 22000

127002

4601 24000 407390 4414.43

Summer 0 0 0 0 0 7193 7193 0 0 0 86114 11972 24000 86114 11971.9

Horticultural & Plantation

0

Total 87972 0 87972 10067 67 53519 20383

4 39807

7 4186 572589

5265.43

970666.1 4762.04

District Irrigation Plan (DIP), Jagatsinghpur Page 36

2.3 Irrigation based Classification

Name of the State: Odisha

Name of the District : Jagatsinghpur

Sl No

Name of the Block

Irrigated (Area in ha) Rainfed (Area in ha)

Gross Irrigated Area Net Irrigated Area Partially Irrigated /

Protective Irrigation Un-Irrigated or Totally

Rainfed

1 Jagatsinghpur 18727 13528 0 883

2 Raghunathpur 10181 7345 0 597

3 Balikuda 18511 12906 0 3197

4 Biridi 10797 7558 0 650

5 Naugaon 6161 3634 0 5441

6 Tirtol 18739 13408 0 1818

7 Kujanga 15728 11520 0 4044

8 Erasama 9907 4056 0 13750

Total 108751 73955 0 30380

District Irrigation Plan (DIP), Jagatsinghpur Page 37

C H A P T E R- III

Water Availability

3.1 Status of Water Availability

Out of the total cropped area of 104335 ha, 73955 ha and 34706 ha area is covered under

irrigation during kharif and rabi season, respectively. Irrigation water was assessed as 1.53

BCM (1.30 in kharif and 0.23 in rabi). The block wise detail of this estimate of water

availability through irrigation infrastructure created is given below in Table 3.1. While 71028

ha (61793 in kharif and 9235 in rabi) is being irrigated from surface irrigation sources

amounting to 1.0871 BCM on volumetric basis. Similarly 37723 ha is being irrigated from

groundwater sources amounting to 0.3741 BCM on volumetric basis. In total 1.4598 BCM of

water is being used for irrigation in both kharif and rabi season.

As regards to availability of surface water for development of Lift Irrigation sector, the

available discharge of three rivers namely Mahanandi, Paika & Devi can be utilised.

Moreover, the surplus discharge of drainage channel, Hansua can also be utilised for

irrigation through Lift Irrigation system. Even in patches of the dead river Alaka Lift Irrigation

system can also be developed.

3.2 Status of Ground Water Availability

Gross annual groundwater recharge is estimated to be 48683 HM. Natural losses is 3654

HM. So, net available groundwater resources is 45029 HM. Ground water draft in different

sectors as per Central Ground Water Board (CGWB) all the blocks are in safe limits of

ground water utilization. The stage of ground water development is 47.37%. Off the 8 blocks

in the district, 3 blocks namely Balikuda, Kujanga & Naugaon are stated to be partially saline

& Erasama block is found to be fully saline. The state of ground water development in

Kujanga & Naugaon block is 62.38% & 67.26%, respectively. As such, considerations of

further draft in these two blocks need to be carefully handled.

3.3. Status of Command Area

The command area development and participatory irrigation management taken up in the

state under the centrally sponsored plan scheme has not been extended to the total

command area of the major irrigation System (Machhagaon and Taladanda Canal system)

and also to the command area of the projects of LIP. The details status of command area

developed is presented below in Table 3.3.

3.4 Existing Type of Irrigation

The details status of existing type of irrigation is presented below in Table 3.4.

District Irrigation Plan (DIP), Jagatsinghpur Page 38

Table 3.1 (A) Status of Water Availability (Source: District Irrigation and

agriculture office)

BCM

S.No. Sources Kharif Rabi Summer Total

1 Surface Irrigation 0

(i) Canal(Major & Medium Irrigation) 0.985182 0 0 0.98518

(ii) Minor Irrigation tanks 0 0 0 0

(iii) Lift Irrigation/Diversion 0.05049 0.0252 0 0.07574

(iv) Various Water Bodies including Rain Water Harvesting

0 0 0 0

(v) Treated Effluent Received from STP 0 0 0 0

(vi) Untreated Effluent 0 0 0 0

(vii) Perennial sources of water 0.0375 0.0038 0 0.04125

Total Surface Irrigation 1.073172 0.029 0 1.10217

2 Groundwater

(i) Open Well 0.0036 0.0009 0 0.0045

(ii) Deep Tube Well 0 0 0 0

(iii) Medium Tube Well 0.061905 0.031 0 0.09286

(iv) Shallow Tube Wells 0.1677 0.1696 0 0.33726

Total Ground Water 0.233205 0.20141 0 0.434618

Grand Total 1.306377 0.2304 0 1.53678

Table 3.1 (B) Status of Water Availability (Source: District Irrigation and agriculture office)

ha

S.No. Sources Kharif Rabi Summer Total

1 Surface Irrigation

(i) Canal(Major & Medium Irrigation) 34770 1717

(ii) Minor Irrigation tanks

(iii) Lift Irrigation/Diversion 4000 2

(iv) Various Water Bodies including Rain Water Harvesting

(v) Treated Effluent Received from STP

(vi) Untreated Effluent

(vii) Perennial sources of water 31742 31720

Total Surface Irrigation 70512 33439 0 0

2 Groundwater

(i) Open Well

(ii) Deep Tube Well

(iii) Medium Tube Well 8383 4502

(iv) Shallow Tube Wells 823

Total Ground Water 9206 4502 0 0

Grand Total 79718 37941 0 0

Table 3.1 (C)

District Irrigation Plan (DIP), Jagatsinghpur Page 39

Block: Jagatsinghpur

BCM

S.No. Sources Kharif Rabi Summ

er Total

1 Surface Irrigation 0

(i) Canal(Major & Medium Irrigation) 0.190707 0 0 0.19071

(ii) Minor Irrigation tanks 0 0 0 0

(iii) Lift Irrigation/Diversion 0 0 0 0

(iv) Various Water Bodies including Rain Water Harvesting

0 0 0 0

(v) Treated Effluent Received from STP 0 0 0 0

(vi) Untreated Effluent 0 0 0 0

(vii) Perennial sources of water 0.0048 0.0003 0 0.00512

Total Surface Irrigation 0.195507 0.0003 0 0.19582

2 Groundwater

(i) Open Well 0.000675 0.00017 0 0.00085

(ii) Deep Tube Well 0 0 0 0

(iii) Medium Tube Well 0.00528 0.00264 0 0.00792

(iv) Shallow Tube Wells 0.024765 0.0324 0 0.05717

Total Ground Water 0.03072 0.03521 0 0.065933

Grand Total 0.226227 0.03553 0 0.261755

Raghunathpur

BCM

S.No. Sources Kharif Rabi Summer Total

1 Surface Irrigation 0

(i) Canal(Major & Medium Irrigation) 0.110484 0 0 0.11048

(ii) Minor Irrigation tanks 0 0 0 0

(iii) Lift Irrigation/Diversion 0.0015 0.00075 0 0.00225

(iv) Various Water Bodies including Rain Water Harvesting

0 0 0 0

(v) Treated Effluent Received from STP 0 0 0 0

(vi) Untreated Effluent 0 0 0 0

(vii) Perennial sources of water 0.00042 9E-05 0 0.00051

Total Surface Irrigation 0.112404 0.0008 0 0.11324

2 Groundwater

(i) Open Well 0.000525 0.00014 0 0.00066

(ii) Deep Tube Well 0 0 0 0

(iii) Medium Tube Well 0.092745 0.0314 0 0.12417

(iv) Shallow Tube Wells 0.01248 0.00624 0 0.01872

Total Ground Water 0.10575 0.0378 0 0.14355

Grand Total 0.218154 0.03864 0 0.256794

District Irrigation Plan (DIP), Jagatsinghpur Page 40

Balikuda

BCM

S.No. Sources Kharif Rabi Summer Total

1 Surface Irrigation 0

(i) Canal(Major & Medium Irrigation) 0.169488 0 0 0.16949

(ii) Minor Irrigation tanks 0 0 0 0

(iii) Lift Irrigation/Diversion 0.00456 0.00228 0 0.00684

(iv) Various Water Bodies including Rain Water Harvesting

0 0 0 0

(v) Treated Effluent Received from STP 0 0 0 0

(vi) Untreated Effluent 0 0 0 0

(vii) Perennial sources of water 0.00522 0.00068 0 0.0059

Total Surface Irrigation 0.179268 0.003 0 0.18222

2 Groundwater

(i) Open Well 0.000075 1.5E-05 0 0.00009

(ii) Deep Tube Well 0 0 0 0

(iii) Medium Tube Well 0.00282 0.00141 0 0.00423

(iv) Shallow Tube Wells 0.03468 0.02939 0 0.06407

Total Ground Water 0.037575 0.03081 0 0.068385

Grand Total 0.216843 0.03377 0 0.250608

Biridi

BCM

S.No. Sources Kharif Rabi Summer Total

1 Surface Irrigation 0

(i) Canal(Major & Medium Irrigation) 0.107283 0 0 0.10728

(ii) Minor Irrigation tanks 0 0 0 0

(iii) Lift Irrigation/Diversion 0.00024 0.00012 0 0.00036

(iv) Various Water Bodies including Rain Water Harvesting

0 0 0 0

(v) Treated Effluent Received from STP 0 0 0 0

(vi) Untreated Effluent 0 0 0 0

(vii) Perennial sources of water 0.003735 0.00011 0 0.00384

Total Surface Irrigation 0.111258 0.0002 0 0.11148

2 Groundwater

(i) Open Well 0.00015 3.8E-05 0 0.00019

(ii) Deep Tube Well 0 0 0 0

(iii) Medium Tube Well 0.00996 0.00498 0 0.01494

(iv) Shallow Tube Wells 0.012045 0.01946 0 0.03151

Total Ground Water 0.022155 0.02448 0 0.046635

Grand Total 0.133413 0.02471 0 0.158118

District Irrigation Plan (DIP), Jagatsinghpur Page 41

Nuagaon

BCM

S.No. Sources Kharif Rabi Summer Total

1 Surface Irrigation 0

(i) Canal(Major & Medium Irrigation) 0.020064 0 0 0.02006

(ii) Minor Irrigation tanks 0 0 0 0

(iii) Lift Irrigation/Diversion 0.0006 0.0003 0 0.0009

(iv) Various Water Bodies including Rain Water Harvesting

0 0 0 0

(v) Treated Effluent Received from STP 0 0 0 0

(vi) Untreated Effluent 0 0 0 0

(vii) Perennial sources of water 0.00672 0.00006 0 0.00678

Total Surface Irrigation 0.027384 0.0004 0 0.02774

2 Groundwater

(i) Open Well 0.000075 1.5E-05 0 0.00009

(ii) Deep Tube Well 0 0 0 0

(iii) Medium Tube Well 0.012 0.006 0 0.018

(iv) Shallow Tube Wells 0.029415 0.01327 0 0.04268

Total Ground Water 0.04149 0.01928 0 0.060773

Grand Total 0.068874 0.01964 0 0.088517

Tirtol

BCM

S.No. Sources Kharif Rabi Summer Total

1 Surface Irrigation 0

(i) Canal(Major & Medium Irrigation) 0.194123 0 0 0.19412

(ii) Minor Irrigation tanks 0 0 0 0

(iii) Lift Irrigation/Diversion 0.0156 0.0078 0 0.0234

(iv) Various Water Bodies including Rain Water Harvesting

0 0 0 0

(v) Treated Effluent Received from STP 0 0 0 0

(vi) Untreated Effluent 0 0 0 0

(vii) Perennial sources of water 0.00477 0.00092 0 0.00569

Total Surface Irrigation 0.214493 0.0087 0 0.22322

2 Groundwater

(i) Open Well 0.00075 0.00019 0 0.00094

(ii) Deep Tube Well 0 0 0 0

(iii) Medium Tube Well 0.01809 0.00905 0 0.02714

(iv) Shallow Tube Wells 0.01461 0.01469 0 0.0293

Total Ground Water 0.03345 0.02392 0 0.057368

Grand Total 0.2479425 0.03264 0 0.280583

District Irrigation Plan (DIP), Jagatsinghpur Page 42

Kujanga

BCM

S.No. Sources Kharif Rabi Summer Total

1 Surface Irrigation 0

(i) Canal(Major & Medium Irrigation) 0.156387 0 0 0.15639

(ii) Minor Irrigation tanks 0 0 0 0

(iii) Lift Irrigation/Diversion 0.01155 0.00578 0 0.01733

(iv) Various Water Bodies including Rain Water Harvesting

0 0 0 0

(v) Treated Effluent Received from STP 0 0 0 0

(vi) Untreated Effluent 0 0 0 0

(vii) Perennial sources of water 0.00285 0.00102 0 0.00387

Total Surface Irrigation 0.170787 0.0068 0 0.17758

2 Groundwater

(i) Open Well 0.0003 7.5E-05 0 0.00038

(ii) Deep Tube Well 0 0 0 0

(iii) Medium Tube Well 0.0009 0.00045 0 0.00135

(iv) Shallow Tube Wells 0.026715 0.01287 0 0.03959

Total Ground Water 0.027915 0.0134 0 0.04131

Grand Total 0.198702 0.02019 0 0.218892

Erasama

BCM

S.No. Sources Kharif Rabi Summer Total

1 Surface Irrigation 0

(i) Canal(Major & Medium Irrigation) 0.036647 0 0 0.03665

(ii) Minor Irrigation tanks 0 0 0 0

(iii) Lift Irrigation/Diversion 0.01644 0.00822 0 0.02466

(iv) Various Water Bodies including Rain Water Harvesting

0 0 0 0

(v) Treated Effluent Received from STP 0 0 0 0

(vi) Untreated Effluent 0 0 0 0

(vii) Perennial sources of water 0.00897 0.00051 0 0.00948

Total Surface Irrigation 0.062057 0.0087 0 0.07079

2 Groundwater

(i) Open Well 0.00105 0.00026 0 0.00131

(ii) Deep Tube Well 0 0 0 0

(iii) Medium Tube Well 0.000705 0.00035 0 0.00106

(iv) Shallow Tube Wells 0.018765 0.03311 0 0.05188

Total Ground Water 0.02052 0.03373 0 0.054248

Grand Total 0.0825765 0.04246 0 0.125034

District Irrigation Plan (DIP), Jagatsinghpur Page 43

Table 3.2 Status of Ground Water Availability

Name of the Block

Status of Block as per Central Ground Water Board Notification

Ground Water (BCM)

Critical Semi-

Critical Safe Draft Recharge Gap

Jagatsinghpur No No Safe 0.0395 0.0822 0

.0427

Raghunathpur No No Safe 0.0272 0.0734 0

.0462

Balikuda No No Safe 0.0254 0.0505 0

.0251

Biridi No No Safe 0.0345 0.0681 0

.0336

Naugaon No No Safe 0.0188 0.0279 0

.0091

Tirtol No No Safe 0.0466 0.0841 0

.0375

Kujanga No No Safe 0.0401 0.0641 0

.0240

Erasama No No Safe 0 0 0

Table 3.3. Status of Command Area

Name of the Block

No of

G.P

No of the

Village

Information of Canal Command

Information on the other Services

Command Total Area

To

tal A

rea

Develo

ped

Are

a

Un

develo

pe

d A

rea

To

tal A

rea

Develo

ped

Are

a

Un

develo

pe

d A

rea

Develo

ped

Co

mm

an

d

Un

develo

pe

d C

om

man

d

2 3 4 5 6 7 8 9 10 6+9 7+10

Jagatsinghpur 29 186 11558 9246 2312 1970 950 1020 10196 3332

Raghunathpur 19 87 6696 5357 1339 649 350 299 5707 1638

Balikuda 30 237 10272 8218 2054 2634 1280 1354 9498 3408

Biridi 21 81 6502 5202 1300 1056 495 561 5697 1861

Naugaon 16 90 1216 973 243 2418 580 1838 1553 2081

Tirtol 27 249 11765 9412 2353 1643 450 1193 9862 3546

Kujanga 27 181 9478 7582 1896 2042 550 1492 8132 3388

Erasama 25 210 2221 1777 444 1835 450 1385 2227 1829

District Irrigation Plan (DIP), Jagatsinghpur Page 44

Table 3.4 Existing Type of Irrigation

Name of the Block

So

urc

e o

f ir

rig

ati

on

Surface Irrigation(1)

Ground Water(2) other

source includin

g tradition

al WHS(3)

Water extraction devices/Lift

Total

canal based Tube well Electricity

pump (4)

Diesel pump

(5)

Irrigation

sources (1+2+3)

water extract

ing units

(4+5+6)

Govt. Canal Govt. Pvt. Pvt.

Jagatsinghpur

No 1 Main Canal & Distriburaty

30 1651 110 1230 246 1476

Comand area (ha)

11558 352 1651 45 215 13821 0

Raghunathpur

No 2 Main Canal & Distriburaty

62 447 76 375 75 450

Comand area (ha)

6696 792 447 35 19 7989 0

Balikuda

No 2 Main Canal & Distriburaty

31 2312 12 1575 315 1890

Comand area (ha)

10272 492 2312 5 234 13315 0

Biridi

No 2 Main Canal & Distriburaty

45 803 25 655 131 786

Comand area (ha)

6502 680 803 10 167 8162 0

Naugaon

No 1 Main Canal & Distriburaty

77 1961 12 1579 316 1894.8

Comand area (ha)

1216 820 1961 5 301 4303 0

Tirtol

No 3 Main Canal & Distriburaty

204 974 125 975 195 1170

Comand area (ha)

11765 2330 974 50 214 15333 0

Kujanga

No 2 Main Canal & Distriburaty

9 1781 50 1448 290 1737.6

Comand area (ha)

9478 830 1781 20 128 12237 0

Erasama

No 1 Main Canal & Distriburaty

3 1251 175 952 190 1142.4

Comand area (ha)

2221 1121 1251 70 402 5065 0

District Irrigation Plan (DIP), Jagatsinghpur Page 45

CHAPTER IV

WATER REQUIREMENT / DEMAND

It is necessary to estimate the water demand from all sources (domestic, livestock, irrigation and industry) for comparison with the potential of available resources both from surface and groundwater resources to arrive at a good irrigation plan. The domestic, livestock, irrigation and industrial requirement of the district is estimated as detailed in the following sections. 4.1 Domestic Water Demand From the population figures of 2011 census the present population (2015) and projected population for 2020 was estimated considering the prevailing growth rate. The domestic water demand was then estimated considering 120 liters and 80 liters of consumption per person per day basis for urban and rural population respectively. A demand of 0.0352 BCM and 0.0364 BCM of water was estimated as the domestic demand during 2015 and 2020, respectively. The details block wise estimation of domestic water demand is presented below in Table no.4.1.

Table 4.1 Water demand

Sl No

Name of the Blocks

Population in 2011

Projected population in

2015

Projected population

in 2020

Gross Water Demand

(BCM) 2015

Gross Water Demand (BCM)

2020

1 Jagatsinghpur 141967 147314 152661 0.0043016 0.004457701

2 Raghunathpur 83646 86796.5 89947 0.0025345 0.002626452

3 Balikuda 165275 171500 177725 0.0050078 0.00518957

4 Biridi 82795 85913 89031 0.0025087 0.002599705

5 Naugaon 77634 80373 83112 0.0023469 0.00242687

6 Tirtol 161100 167167.5 173235 0.0048813 0.005058462

7 Kujanga 176065 182696.5 189328 0.0053347 0.005528378

8 Erasama 146273 151782 157291 0.004432 0.004592897

9 Jagatsinghpur (M) 33631 34897.5 36164 0.0012738 0.001319986

10 Paradeep(M) 68585 71168 73751 0.0025976 0.002691912

TOTAL 1136971 1179608 1222245 0.03521883 0.036491934

District Irrigation Plan (DIP), Jagatsinghpur Page 46

4.2 Crop Water Demand

The block wise and crop wise area sown and the corresponding area under irrigation are given below in Table 4.2. The volumetric water demand is estimated by multiplying the crop water requirement for the particular crop to arrive the total crop water demand. The crop water demand for the district is calculated as 0.746 BCM. Besides the water potential required, existing water potential and water potential to be created is calculated as 1.1194, 0.260 and 0.858 respectively.

Table 4.2 Crop Water demand

Crops

Area sown (ha)

Kharif

Crop water demand (kharif) (BCM)

Area sown (ha) Rabi

Crop water demand

(Rabi)(BCM)

Area sown (ha)

Irrigated area (ha)

Total Crop water

demand (mm)

Water potential required (BCM)

PADDY 86534 0.951874 1260 0.01386 87794 1260 0.965734 1.448601

MAIZE 45 0.00027 118 0.000708 163 118 0.000978 0.001467

Ragi ( Dry ) 5 0.00002 0 5 0 0.00002 0.00003

Bajra ( Local ) 0 0 0 0 0 0 0

Small Millets 0 0 0 0 0 0 0

Jower 0 0 0 0 0 0 0

Wheat 0 0 10 0.00004 10 10 0.00004 0.00006

Total Cereals 86584 0.952164 1388 0.014608 87972 1388 0.966772 1.450158

MUNG 0 0 38162 0.133567 38162 0 0.133567 0.2003505

BIRI 102 0.000612 14954 0.089724 15056 0 0.090336 0.135504

Cowpea 31 0.0001085 348 0.001218 379 348 0.0013265 0.00198975

Arhar 15 0.00009 0 0 15 0 0.00009 0.000135

Horsegram 0 2022 0.007077 2022 0 0.007077 0.0106155

Gram 0 50 0.000175 50 0 0.000175 0.0002625

Fieldpea 0 125 0.0005 125 125 0.0005 0.00075

Lentil 0 0 0 0 0 0 0

Total Pulses 148 0.0008105 55661 0.232261 55809 473 0.2330715 0.34960725

Groundnut 0 8498 0.04249 8498 90 0.04249 0.063735

Til 5 0.000025 138 0.00069 143 0 0.000715 0.0010725

Caster 5 0.000025 0 5 0 0.000025 0.0000375

Sunflower 0 472 0.001888 472 472 0.001888 0.002832

Mustard 0 949 0.003796 949 0 0.003796 0.005694

Nizer 0 0 0 0 0 0

Linseed 0 0 0 0 0 0

Total Oil Seed 10 0.00005 10057 0.048864 10067 562 0.048914 0.073371

Potato 0 2102 0.012612 2102 2102 0.012612 0.018918

Onion 0 886 0.005316 886 886 0.005316 0.007974

Other Vegetables 14871 0.104097 25438 0.178066 40309 25438 0.282163 0.4232445

Total Vegetable 14871 0.104097 28426 0.195994 43297 28426 0.300091 0.4501365

Chili 1160 0.00812 2200 0.0154 3360 2200 0.02352 0.03528

TURMERIC 322 0.001932 0 322 0 0.001932 0.002898

Corriender 0 0 551 0.002755 551 551 0.002755 0.0041325

Zinger 403 0.002418 0 403 0 0.002418 0.003627

Garlic 0 400 0.0024 400 400 0.0024 0.0036

Total Spices 1885 0.01247 3151 0.020555 5036 3151 0.033025 0.0495375

Fiber 67 0.000402 0 67 0.000402 0.000603

Sugarcane 790 0.01659 796 0.016716 1586 796 0.033306 0.049959

District Irrigation Plan (DIP), Jagatsinghpur Page 47

Block: Jagatsinghpur

Crops

Area sown (ha)

Kharif

Crop water demand

(kharif)(BCM)

Area sown (ha) Rabi

Crop water demand

(Rabi)(BCM)

Area sown (ha)

Irrigated area (ha)

Total Crop water

demand (mm)

Water potential required (BCM)

PADDY 11230 0.12353 20 0.00022 11250 20 0.12375 0.185625

MAIZE 5 0.00003 14 0.000084 19 14 0.000114 0.000171

Ragi ( Dry ) 1 0.000004 0 0 1 0 0.000004 0.000006

Bajra ( Local ) 0 0 0 0 0 0 0

Small Millets 0 0 0 0 0 0 0

Jower 0 0 0 0 0 0 0

Wheat 0 0 0 0 0 0 0 0

Total Cereals 11236 0.123564 34 0.000304 11270 34 0.123868 0.185802

MUNG 0 0 6231 0.0218085 6231 0 0.0218085 0.03271275

BIRI 7 0.000042 2290 0.01374 2297 0 0.013782 0.020673

Cowpea 10 0.000035 25 0.0000875 35 25 0.0001225 0.00018375

Arhar 3 0.000018 0 0 3 0 0.000018 0.000027

Horsegram 0 69 0.0002415 69 0 0.0002415 0.00036225

Gram 0 7 0.0000245 7 0 0.0000245 0.00003675

Fieldpea 0 8 0.000032 8 8 0.000032 0.000048

Lentil 0 0 0 0 0 0 0

Total Pulses 20 0.000095 8630 0.035934 8650 33 0.036029 0.0540435

Groundnut 0 690 0.00345 690 8 0.00345 0.005175

Til 0 0 5 0.000025 5 0 0.000025 0.0000375

Caster 1 0.000005 0 1 0 0.000005 0.0000075

Sunflower 0 47 0.000188 47 47 0.000188 0.000282

Mustard 0 50 0.0002 50 0 0.0002 0.0003

Nizer 0 0 0 0 0 0

Linseed 0 0 0 0 0 0

Total Oil Seed 1 0.000005 792 0.003863 793 55 0.003868 0.005802

Potato 0 585 0.00351 585 585 0.00351 0.005265

Onion 0 113 0.000678 113 113 0.000678 0.001017

Other Vegetables

2801 0.019607 4154 0.029078 6955 4154 0.048685 0.0730275

Total Vegetable 2801 0.019607 4852 0.033266 7653 4852 0.052873 0.0793095

Chili 175 0.001225 115 0.000805 290 115 0.00203 0.003045

TURMERIC 44 0.000264 0 44 0 0.000264 0.000396

Corriender 0 0 31 0.000155 31 31 0.000155 0.0002325

Zinger 50 0.0003 0 50 0 0.0003 0.00045

Garlic 0 40 0.00024 40 40 0.00024 0.00036

Total Spices 269 0.001789 186 0.0012 455 186 0.002989 0.0044835

Fiber 10 0.00006 0 10 0.00006 0.00009

Sugarcane 58 0.001218 39 0.000819 97 39 0.002037 0.0030555

Total

District Irrigation Plan (DIP), Jagatsinghpur Page 48

Block: Raghunathpur

Crops

Area sown (ha)

Kharif

Crop water demand

(kharif)(BCM)

Area sown (ha) Rabi

Crop water demand

(Rabi)(BCM)

Area sown (ha)

Irrigated area (ha)

Total Crop water

demand (mm)

Water potential required (BCM)

PADDY 6930 0.07623 60 0.00066 6990 60 0.07689 0.115335

MAIZE 4 0.000024 15 0.00009 19 15 0.000114 0.000171

Ragi ( Dry ) 1 0.000004 0 1 0 0.000004 0.000006

Bajra ( Local ) 0 0 0 0 0 0 0

Small Millets 0 0 0 0 0 0 0

Jower 0 0 0 0 0 0 0

Wheat 0 0 0 0 0 0 0 0

Total Cereals 6935 0.076258 75 0.00075 7010 75 0.077008 0.115512

MUNG 0 0 3117 0.0109095 3117 0 0.0109095 0.01636425

BIRI 8 0.000048 1570 0.00942 1578 0 0.009468 0.014202

Cowpea 2 0.000007 25 0.0000875 27 25 0.0000945 0.00014175

Arhar 1 0.000006 0 0 1 0 0.000006 0.000009

Horsegram 0 130 0.000455 130 0 0.000455 0.0006825

Gram 0 5 0.0000175 5 0 0.0000175 0.00002625

Fieldpea 0 8 0.000032 8 8 0.000032 0.000048

Lentil 0 0 0 0 0 0 0

Total Pulses 11 0.000061 4855 0.0209215 4866 33 0.0209825 0.03147375

Groundnut 0 284 0.001704 284 2 0.001704 0.002556

Til 1 0.000005 5 0.000025 6 0 0.00003 0.000045

Caster 0 0 0 0 0 0 0

Sunflower 0 44 0.000176 44 44 0.000176 0.000264

Mustard 0 50 0.0002 50 0 0.0002 0.0003

Nizer 0 0 0 0 0 0

Linseed 0 0 0 0 0 0

Total Oil Seed 1 0.000005 383 0.002105 384 46 0.00211 0.003165

Potato 0 185 0.00148 185 185 0.00148 0.00222

Onion 0 163 0.001304 163 163 0.001304 0.001956

Other Vegetables

597 0.004179 1724 0.013792 2321 1724 0.017971 0.0269565

Total Vegetable 597 0.004179 2072 0.016576 2669 2072 0.020755 0.0311325

Chili 77 0.000539 220 0.00154 297 220 0.002079 0.0031185

TURMERIC 15 0.00009 0 15 0 0.00009 0.000135

Corriender 0 0 70 0.00035 70 70 0.00035 0.000525

Zinger 41 0.000246 0 0 41 0 0.000246 0.000369

Garlic 0 10 0.00006 10 10 0.00006 0.00009

Total Spices 133 0.000875 300 0.00195 433 300 0.002825 0.0042375

Fiber 10 0.00006 0 10 0.00006 0.00009

Sugarcane 309 0.006489 310 0.00651 619 310 0.012999 0.0194985

Total

District Irrigation Plan (DIP), Jagatsinghpur Page 49

Block: Balikuda

Crops

Area sown (ha)

Kharif

Crop water demand

(kharif)(BCM)

Area sown (ha) Rabi

Crop water demand

(Rabi)(BCM)

Area sown (ha)

Irrigated area (ha)

Total Crop water

demand (mm)

Water potential required (BCM)

PADDY 13340 0.14674 20 0.00022 13360 20 0.14696 0.22044

MAIZE 7 0.000042 15 0.00009 22 15 0.000132 0.000198

Ragi ( Dry ) 1 0.000004 0 1 0 0.000004 0.000006

Bajra ( Local ) 0 0 0 0 0 0 0

Small Millets 0 0 0 0 0 0 0

Jower 0 0 0 0 0 0 0

Wheat 0 0 0 0 0 0 0 0

Total Cereals 13348 0.146786 35 0.00031 13383 35 0.147096 0.220644

MUNG 0 0 8277 0.0289695 8277 0 0.0289695 0.04345425

BIRI 12 0.000072 771 0.004626 783 0 0.004698 0.007047

Cowpea 3 0.0000105 20 0.00007 23 20 0.0000805 0.00012075

Arhar 2 0.000012 0 0 2 0 0.000012 0.000018

Horsegram 0 470 0.001645 470 0 0.001645 0.0024675

Gram 0 7 0.0000245 7 0 0.0000245 0.00003675

Fieldpea 0 16 0.000064 16 16 0.000064 0.000096

Lentil 0 0 0 0 0 0 0

Total Pulses 17 0.0000945 9561 0.035399 9578 36 0.0354935 0.05324025

Groundnut 0 280 0.0014 280 2 0.0014 0.0021

Til 1 0.000005 50 0.00025 51 0 0.000255 0.0003825

Caster 0 0 0 0 0 0 0 0

Sunflower 0 106 0.000424 106 106 0.000424 0.000636

Mustard 0 99 0.000396 99 0 0.000396 0.000594

Nizer 0 0 0 0 0 0 0

Linseed 0 0 0 0 0 0 0

Total Oil Seed 1 0.000005 535 0.00247 536 108 0.002475 0.0037125

Potato 0 165 0.00099 165 165 0.00099 0.001485

Onion 0 104 0.000624 104 104 0.000624 0.000936

Other Vegetables

2286 0.016002 4122 0.028854 6408 4122 0.044856 0.067284

Total Vegetable 2286 0.016002 4391 0.030468 6677 4391 0.04647 0.069705

Chili 285 0.001995 845 0.005915 1130 845 0.00791 0.011865

TURMERIC 15 0.00009 0 15 0 0.00009 0.000135

Corriender 0 0 60 0.0003 60 60 0.0003 0.00045

Zinger 50 0.0003 0 50 0 0.0003 0.00045

Garlic 0 80 0.00048 80 80 0.00048 0.00072

Total Spices 350 0.002385 985 0.006695 1335 985 0.00908 0.01362

Fiber 9 0.000054 0 9 0.000054 0.000081

Sugarcane 58 0.001218 50 0.00105 108 50 0.002268 0.003402

Total 16069 0.1665445 15557 0.076392 31626 5605 0.2429365 0.36440475

District Irrigation Plan (DIP), Jagatsinghpur Page 50

Block: Biridi

Crops

Area sown (ha)

Kharif

Crop water

demand (kharif) (BCM)

Area sown (ha) Rabi

Crop water demand

(Rabi)(BCM)

Area sown (ha)

Irrigated area (ha)

Total Crop water

demand (mm)

Water potential required (BCM)

PADDY 6020 0.06622 10 0.00011 6030 10 0.06633 0.099495

MAIZE 5 0.00003 14 0.000084 19 14 0.000114 0.000171

Ragi ( Dry ) 0 0 0 0 0 0 0

Bajra ( Local ) 0 0 0 0 0 0 0

Small Millets 0 0 0 0 0 0 0

Jower 0 0 0 0 0 0 0

Wheat 0 0 2 0.000008 2 2 0.000008 0.000012

Total Cereals 6025 0.06625 26 0.000202 6051 26 0.066452 0.099678

MUNG 0 0 2751 0.0096285 2751 0 0.0096285 0.01444275

BIRI 5 0.00003 1071 0.006426 1076 0 0.006456 0.009684

Cowpea 2 0.000007 48 0.000168 50 48 0.000175 0.0002625

Arhar 2 0.000012 0 0 2 0 0.000012 0.000018

Horsegram 0 550 0.001925 550 0 0.001925 0.0028875

Gram 0 7 0.0000245 7 0 0.0000245 0.00003675

Fieldpea 0 17 0.000068 17 17 0.000068 0.000102

Lentil 0 0 0 0 0 0 0

Total Pulses 9 0.000049 4444 0.01824 4453 65 0.018289 0.0274335

Groundnut 0 379 0.001895 379 5 0.001895 0.0028425

Til 1 0.000005 40 0.0002 41 0 0.000205 0.0003075

Caster 1 0.000005 0 0 1 0 0.000005 0.0000075

Sunflower 0 48 0.000192 48 48 0.000192 0.000288

Mustard 0 50 0.0002 50 0 0.0002 0.0003

Nizer 0 0 0 0 0 0 0

Linseed 0 0 0 0 0 0 0

Total Oil Seed 2 0.00001 517 0.002487 519 53 0.002497 0.0037455

Potato 0 265 0.00159 265 265 0.00159 0.002385

Onion 0 164 0.000984 164 164 0.000984 0.001476

Other Vegetables

1655 0.011585 2066 0.014462 3721 2066 0.026047 0.0390705

Total Vegetable 1655 0.011585 2495 0.017036 4150 2495 0.028621 0.0429315

Chili 60 0.00042 230 0.00161 290 230 0.00203 0.003045

TURMERIC 52 0.000312 0 52 0 0.000312 0.000468

Corriender 0 0 50 0.00025 50 50 0.00025 0.000375

Zinger 60 0.00036 0 60 0 0.00036 0.00054

Garlic 0 40 0.00024 40 40 0.00024 0.00036

Total Spices 172 0.001092 320 0.0021 492 320 0.003192 0.004788

Fiber 10 0.00006 0 10 0.00006 0.00009

Sugarcane 268 0.005628 280 0.00588 548 280 0.011508 0.017262

Total 8141 0.0846740 8082 0.045945 16223 3239 0.130619 0.1959285

District Irrigation Plan (DIP), Jagatsinghpur Page 51

Block: Nuagaon

Crops

Area sown (ha)

Kharif

Crop water

demand (kharif) (BCM)

Area sown (ha) Rabi

Crop water demand

(Rabi)(BCM)

Area sown (ha)

Irrigated area (ha)

Total Crop water

demand (mm)

Water potential required (BCM)

PADDY 7110 0.07821 80 0.00088 7190 80 0.07909 0.118635

MAIZE 4 0.000024 15 0.00009 19 15 0.000114 0.000171

Ragi ( Dry ) 0 0 0 0 0 0 0

Bajra ( Local ) 0 0 0 0 0 0 0

Small Millets 0 0 0 0 0 0 0

Jower 0 0 0 0 0 0 0

Wheat 0 0 2 0.000008 2 2 0.000008 0.000012

Total Cereals 7114 0.078234 97 0.000978 7211 97 0.079212 0.118818

MUNG 0 0 1567 0.0054845 1567 0 0.0054845 0.00822675

BIRI 5 0.00003 1500 0.009 1505 0 0.00903 0.013545

Cowpea 2 0.000007 30 0.000105 32 30 0.000112 0.000168

Arhar 1 0.000006 0 0 1 0 0.000006 0.000009

Horsegram 0 140 0.00049 140 0 0.00049 0.000735

Gram 0 5 0.0000175 5 0 0.0000175 0.00002625

Fieldpea 0 13 0.000052 13 13 0.000052 0.000078

Lentil 0 0 0 0 0 0 0

Total Pulses 8 0.000043 3255 0.015149 3263 43 0.015192 0.022788

Groundnut 0 2595 0.012975 2595 28 0.012975 0.0194625

Til 0 0 5 0.000025 5 0 0.000025 0.0000375

Caster 0 0 0 0 0 0 0

Sunflower 0 67 0.000268 67 67 0.000268 0.000402

Mustard 0 70 0.00028 70 0 0.00028 0.00042

Nizer 0 0 0 0 0 0

Linseed 0 0 0 0 0 0

Total Oil Seed 0 0 2737 0.013548 2737 95 0.013548 0.020322

Potato 0 185 0.00111 185 185 0.00111 0.001665

Onion 0 165 0.00099 165 165 0.00099 0.001485

Other Vegetables

1580 0.01106 1558 0.010906 3138 1558 0.021966 0.032949

Total Vegetable 1580 0.01106 1908 0.013006 3488 1908 0.024066 0.036099

Chili 200 0.0014 175 0.001225 375 175 0.002625 0.0039375

TURMERIC 45 0.00027 0 45 0 0.00027 0.000405

Corriender 0 0 90 0.00045 90 90 0.00045 0.000675

Zinger 60 0.00036 0 60 0 0.00036 0.00054

Garlic 0 90 0.00054 90 90 0.00054 0.00081

Total Spices 305 0.00203 355 0.002215 660 355 0.004245 0.0063675

Fiber 9 0.000054 0 9 0.000054 0.000081

Sugarcane 39 0.000819 29 0.000609 68 29 0.001428 0.002142

District Irrigation Plan (DIP), Jagatsinghpur Page 52

Block: Tirtol

Crops

Area sown (ha)

Kharif

Crop water

demand (kharif) (BCM)

Area sown (ha) Rabi

Crop water demand

(Rabi)(BCM)

Area sown (ha)

Irrigated area (ha)

Total Crop water

demand (mm)

Water potential required (BCM)

PADDY 12890 0.14179 10 0.00011 12900 10 0.1419 0.21285

MAIZE 5 0.00003 15 0.00009 20 15 0.00012 0.00018

Ragi ( Dry ) 0 0 0 0 0 0 0

Bajra ( Local ) 0 0 0 0 0 0 0

Small Millets 0 0 0 0 0 0 0

Jower 0 0 0 0 0 0 0

Wheat 0 0 2 0.000008 2 2 0.000008 0.000012

Total Cereals 12895 0.14182 27 0.000208 12922 27 0.142028 0.213042

MUNG 0 0 4602 0.016107 4602 0 0.016107 0.0241605

BIRI 15 0.00009 3521 0.021126 3536 0 0.021216 0.031824

Cowpea 3 0.0000105 25 0.0000875 28 25 0.000098 0.000147

Arhar 2 0.000012 0 0 2 0 0.000012 0.000018

Horsegram 0 299 0.0010465 299 0 0.0010465 0.00156975

Gram 0 7 0.0000245 7 0 0.0000245 0.00003675

Fieldpea 0 9 0.000036 9 9 0.000036 0.000054

Lentil 0 0 0 0 0 0 0

Total Pulses 20 0.0001125 8463 0.0384275 8483 34 0.03854 0.05781

Groundnut 0 890 0.00445 890 8 0.00445 0.006675

Til 1 0.000005 9 0.000045 10 0 0.00005 0.000075

Caster 1 0.000005 0 1 0 0.000005 0.0000075

Sunflower 0 55 0.00022 55 55 0.00022 0.00033

Mustard 0 280 0.00112 280 0 0.00112 0.00168

Nizer 0 0 0 0 0 0

Linseed 0 0 0 0 0 0

Total Oil Seed 2 0.00001 1234 0.005835 1236 63 0.005845 0.0087675

Potato 0 425 0.00255 425 425 0.00255 0.003825

Onion 0 111 0.000666 111 111 0.000666 0.000999

Other Vegetables

2011 0.014077 4213 0.029491 6224 4213 0.043568 0.065352

Total Vegetable 2011 0.014077 4749 0.032707 6760 4749 0.046784 0.070176

Chili 198 0.001386 260 0.00182 458 260 0.003206 0.004809

TURMERIC 77 0.000462 0 77 0 0.000462 0.000693

Corriender 0 0 60 0.0003 60 60 0.0003 0.00045

Zinger 68 0.000408 0 68 0 0.000408 0.000612

Garlic 0 50 0.0003 50 50 0.0003 0.00045

Total Spices 343 0.002256 370 0.00242 713 370 0.004676 0.007014

Fiber 5 0.00003 0 5 0.00003 0.000045

Sugarcane 58 0.001218 88 0.001848 146 88 0.003066 0.004599

District Irrigation Plan (DIP), Jagatsinghpur Page 53

Block: Kujanga

Crops

Area sown (ha)

Kharif

Crop water

demand (kharif) (BCM)

Area sown (ha) Rabi

Crop water demand

(Rabi)(BCM)

Area sown (ha)

Irrigated area (ha)

Total Crop water

demand (mm)

Water potential required (BCM)

PADDY 13514 0.148654 300 0.0033 13814 300 0.151954 0.227931

MAIZE 10 0.00006 15 0.00009 25 15 0.00015 0.000225

Ragi ( Dry ) 1 0.000004 0 1 0 0.000004 0.000006

Bajra ( Local ) 0 0 0 0 0 0 0

Small Millets 0 0 0 0 0 0 0

Jower 0 0 0 0 0 0 0

Wheat 0 0 2 0.000008 2 2 0.000008 0.000012

Total Cereals 13525 0.148718 317 0.003398 13842 317 0.152116 0.228174

MUNG 0 0 6686 0.023401 6686 0 0.023401 0.0351015

BIRI 28 0.000168 1255 0.00753 1283 0 0.007698 0.011547

Cowpea 4 0.000014 35 0.0001225 39 35 0.0001365 0.00020475

Arhar 2 0.000012 0 0 2 0 0.000012 0.000018

Horsegram 0 59 0.0002065 59 0 0.0002065 0.00030975

Gram 0 6 0.000021 6 0 0.000021 0.0000315

Fieldpea 0 8 0.000032 8 8 0.000032 0.000048

Lentil 0 0 0 0 0 0 0

Total Pulses 34 0.000194 8049 0.031313 8083 43 0.031507 0.0472605

Groundnut 0 2990 0.01495 2990 34 0.01495 0.022425

Til 1 0.000005 5 0.000025 6 0 0.00003 0.000045

Caster 1 0.000005 0 1 0 0.000005 0.0000075

Sunflower 0 48 0.000192 48 48 0.000192 0.000288

Mustard 0 250 0.001 250 0 0.001 0.0015

Nizer 0 0 0 0 0 0

Linseed 0 0 0 0 0 0

Total Oil Seed 2 0.00001 3293 0.016167 3295 82 0.016177 0.0242655

Potato 0 155 0.00093 155 155 0.00093 0.001395

Onion 0 32 0.000192 32 32 0.000192 0.000288

Other Vegetables

2010 0.01407 3229 0.022603 5239 3229 0.036673 0.0550095

Total Vegetable 2010 0.01407 3416 0.023725 5426 3416 0.037795 0.0566925

Chili 80 0.00056 230 0.00161 310 230 0.00217 0.003255

TURMERIC 45 0.00027 0 45 0 0.00027 0.000405

Corriender 0 0 70 0.00035 70 70 0.00035 0.000525

Zinger 34 0.000204 0 34 0 0.000204 0.000306

Garlic 0 50 0.0003 50 50 0.0003 0.00045

Total Spices 159 0.001034 350 0.00226 509 350 0.003294 0.004941

Fiber 6 0.000036 0 6 0.000036 0.000054

Sugarcane 0 0 0 0 0 0 0 0

District Irrigation Plan (DIP), Jagatsinghpur Page 54

Block: Erasama

Crops

Area sown (ha)

Kharif

Crop water

demand (kharif) (BCM)

Area sown (ha) Rabi

Crop water demand

(Rabi)(BCM)

Area sown (ha)

Irrigated area (ha)

Total Crop water

demand (mm)

Water potential required (BCM)

PADDY 15500 0.1705 760 0.00836 16260 760 0.17886 0.26829

MAIZE 5 0.00003 15 0.00009 20 15 0.00012 0.00018

Ragi ( Dry ) 1 0.000004 0 1 0 0.000004 0.000006

Bajra ( Local ) 0 0 0 0 0 0 0

Small Millets 0 0 0 0 0 0 0

Jower 0 0 0 0 0 0 0

Wheat 0 0 2 0.000008 2 2 0.000008 0.000012

Total Cereals 15506 0.170534 777 0.008458 16283 777 0.178992 0.268488

MUNG 0 0 4931 0.0172585 4931 0 0.0172585 0.02588775

BIRI 22 0.000132 2976 0.017856 2998 0 0.017988 0.026982

Cowpea 5 0.0000175 140 0.00049 145 140 0.0005075 0.00076125

Arhar 2 0.000012 0 0 2 0 0.000012 0.000018

Horsegram 0 305 0.0010675 305 0 0.0010675 0.00160125

Gram 0 6 0.000021 6 0 0.000021 0.0000315

Fieldpea 0 46 0.000184 46 46 0.000184 0.000276

Lentil 0 0 0 0 0 0 0

Total Pulses 29 0.0001615 8404 0.036877 8433 186 0.0370385 0.05555775

Groundnut 0 390 0.00195 390 3 0.00195 0.002925

Til 0 0 19 0.000095 19 0 0.000095 0.0001425

Caster 1 0.000005 0 1 0 0.000005 0.0000075

Sunflower 0 57 0.000228 57 57 0.000228 0.000342

Mustard 0 100 0.0004 100 0 0.0004 0.0006

Nizer 0 0 0 0 0 0

Linseed 0 0 0 0 0 0

Total Oil Seed 1 0.000005 566 0.002673 567 60 0.002678 0.004017

Potato 0 137 0.000822 137 137 0.000822 0.001233

Onion 0 34 0.000204 34 34 0.000204 0.000306

Other Vegetables

1931 0.013517 4372 0.030604 6303 4372 0.044121 0.0661815

Total Vegetable 1931 0.013517 4543 0.03163 6474 4543 0.045147 0.0677205

Chili 85 0.000595 125 0.000875 210 125 0.00147 0.002205

TURMERIC 29 0.000174 0 29 0 0.000174 0.000261

Corriender 0 0 120 0.0006 120 120 0.0006 0.0009

Zinger 40 0.00024 0 40 0 0.00024 0.00036

Garlic 0 40 0.00024 40 40 0.00024 0.00036

Total Spices 154 0.001009 285 0.001715 439 285 0.002724 0.004086

Fiber 8 0.000048 0 8 0.000048 0.000072

Sugarcane 0 0 0 0 0 0 0 0

District Irrigation Plan (DIP), Jagatsinghpur Page 55

4.3 Livestock Water Demand

Considering the daily water requirement of individual livestock the total water

requirement for the livestock in various blocks as on 2015 is calculated as 0.00341

BCM. Similarly the projected water demand for the year 2020 will be 0.00410 BCM.

The detailed block wise livestock water demand is presented below in Table 4.3.

Table 4.3 Livestock water demand

Block Total number of

live stock Present water

demand (BCM) Water demand in 2020 (BCM)

Jagatsinghpur 206036 0.000448063 0.00050945

Raghunathpur 127465 0.00022507 0.0002559

Balikuda 102423 0.000591289 0.0006723

Biridi 114085 0.000273156 0.00031058

Naugaon 64082 0.000306868 0.00034891

Tirtol 147210 0.000524967 0.00059689

Kujanga 73057 0.00051547 0.00058609

Erasama 81684 0.000532888 0.00060589

TOTAL 916,042 0.0034 0.0039

4.4 Industrial Water Demand

Present Industrial draft has been collected from the Mahanadi South Irrigation

Division, Cuttack. There are 9 nos of Industry in Paradeep. The present water

demand and projected for 2020 have been reflected against Kujanga block in Table

no. 4.4.

District Irrigation Plan (DIP), Jagatsinghpur Page 56

Table 4.4 Industrial water demand

Sl No

Block No of the industry

Water demand (BCM)

Water demand in 2020 (BCM)

1 Jagatsinghpur 0 0 0

2 Raghunathpur 0 0 0

3 Balikuda 0 0 0

4 Biridi 0 0 0

5 Naugaon 0 0 0

6 Tirtol 0 0 0

7 Kujanga 9 0.45097977 0.676469655

8 Erasama 0 0 0

4.5 Water Demand for Power Generation No water has been provisioned for power generation.

District Irrigation Plan (DIP), Jagatsinghpur Page 57

4.6 Total Water Demand of the District for Various Sectors The water demand for various sectors for various blocks was added up to find out

the overall water demand for the different blocks and the district for the present

period. It is worked out that 1.850 BCM of water is required for the district to meet

the domestic, crop, livestock and industrial requirements as given in Table 4.6.

Table 4.6 Total Water Demand

S. No

Block

Components

Total, BCM

Domestic Crop Livestock Industrial Power

generation

1 Jagatsinghpur 0.004457701 0.332586 0.000509448 0 0 0.3375531

2 Raghunathpur 0.002626452 0.2051092 0.000255904 0 0 0.2079916

3 Balikuda 0.00518957 0.3644047 0.000672296 0 0 0.3702666

4 Biridi 0.002599705 0.1959285 0.000310579 0 0 0.1988388

5 Naugaon 0.00242687 0.2066175 0.000348909 0 0 0.2093933

6 Tirtol 0.005058462 0.3614535 0.000596888 0 0 0.3671088

7 Kujanga 0.005528378 0.3613875 0.00058609 0.0450980 0 0.4125999

8 Erasama 0.004592897 0.3999412 0.000605894 0 0 0.4051400

Total 0.032480036 2.4274282 0.003886008 0.0450980 0 2.5088923

District Irrigation Plan (DIP), Jagatsinghpur Page 58

4.7 Water Budget

On finding the demand and availability, the gap in the district for the present

level and for 2020 was worked out (Table 4.6). The present demand and projected

demand for 2020 in the district comes to be 2.51 and 2.85 BCM, respectively

indicating a gap of 0.830 BCM for the present and 1.019 BCM for the projected

demand of 2020.

Table 4.7 Water budget

Name of the Blocks

Existing water availability (BCM) Total

(BCM)

Water Demand (BCM)

Water Gap (BCM)

Surface of water

Ground water

Present 2015

Projected (2020)

Present 2015

Projected (2020)

Jagatsinghpur

0.195822 0.0659325 0.261754 0.337553 0.3837979 0.075799 0.1220434

Raghunathpur

0.113244 0.14355 0.256794 0.207991 0.2364864 -0.048802 -0.0203075

Balikuda 0.182223 0.068385 0.250608 0.370267 0.4209931 0.119659 0.1703851

Biridi 0.111483 0.046635 0.158118 0.198839 0.2260797 0.040721 0.0679617

Naugaon 0.027744 0.0607725 0.088516 0.209393 0.2380801 0.120877 0.1495636

Tirtol 0.223215 0.0573675 0.280582 0.367109 0.4174028 0.086526 0.1368203

Kujanga 0.177582 0.04131 0.218892 0.412600 0.4691261 0.193708 0.2502341

Erasama 0.070786 0.0542475 0.125034 0.405140 0.4606442 0.280106 0.3356102

Total 1.102099 0.5382 1.640299 2.508892 2.8526105 0.868593 1.2123110

District Irrigation Plan (DIP), Jagatsinghpur Page 59

Chapter V Strategic Action Plan for Irrigation

Stragetic plan was prepared for Jagatsinghpur district by considering the water availability

status i.e. canal, river network, drainage network pattern. Landuse classification, slope and

cropped area were also been considered while preparing the strategic plan for the district.

Stragic plan with detail budget and component wise break up is given in Table 5.1 Block

wise specific irrigation approach is given in Fig. 5.1 to 5.8.

Fig. 5.1 Existing water resource of Jagatsinghpur block (River, canal, drain and water

bodies)

Sl. No Specific strategic plan

1 Constructions of field channel

2 Renovation of Dead Rivers & Constrituion of Check dams.

3 Renovation of Drainage system & construction of Check dam.

4 Renovation, linning & concrete work in Distributries of Major Irrigation.

5 Construction of New LIP.

6 Addeption of Micro Irrigation through Drips and Sprinkler

7 Renovation of Farm Pond.

District Irrigation Plan (DIP), Jagatsinghpur Page 60

Fig. 5.2 Existing water resource of Raghunathpur block (River, canal, drain and water

bodies)

Sl. No Specific strategic plan

1 Constructions of field channel

2 Renovation of Dead Rivers & Constrituion of Check dams.

3 Renovation of Drainage system & construction of Check dam.

4 Renovation, linning & concrete work in Distributries of Major Irrigation.

5 Construction of New LIP.

6 Addeption of Micro Irrigation through Drips and Sprinkler

7 Renovation of Farm Pond.

District Irrigation Plan (DIP), Jagatsinghpur Page 61

Fig. 5.3 Existing water resource of Balikuda block (River, canal, drain and water

bodies)

Sl. No Specific strategic plan

1 Constructions of field channel

2 Renovation of Dead Rivers & Constrituion of Check dams.

3 Renovation of Drainage system & construction of Check dam.

4 Renovation, linning & concrete work in Distributries of Major Irrigation.

5 Construction of New LIP.

6 Addeption of Micro Irrigation through Drips and Sprinkler

7 Renovation of Farm Pond.

District Irrigation Plan (DIP), Jagatsinghpur Page 62

Fig. 5.4 Existing water resource of Biridi block (River, canal, drain and water bodies)

Sl. No Specific strategic plan

1 Constructions of field channel

2 Renovation of Dead Rivers & Constrituion of Check dams.

3 Renovation of Drainage system & construction of Check dam.

4 Renovation, linning & concrete work in Distributries of Major Irrigation.

5 Construction of New LIP.

6 Addeption of Micro Irrigation through Drips and Sprinkler

7 Renovation of Farm Pond.

District Irrigation Plan (DIP), Jagatsinghpur Page 63

Fig. 5.5 Existing water resource of Nuagaon block (River, canal, drain and water

bodies)

Sl. No Specific strategic plan

1 Constructions of field channel

2 Renovation of Dead Rivers & Constrituion of Check dams.

3 Renovation of Drainage system & construction of Check dam.

4 Renovation, linning & concrete work in Distributries of Major Irrigation.

5 Construction of New LIP.

6 Addeption of Micro Irrigation through Drips and Sprinkler

7 Renovation of Farm Pond.

District Irrigation Plan (DIP), Jagatsinghpur Page 64

Fig. 5.6 Existing water resource of Tirtol block (River, canal, drain and water bodies)

Sl. No Specific strategic plan

1 Constructions of field channel

2 Renovation of Dead Rivers & Constrituion of Check dams.

3 Renovation of Drainage system & construction of Check dam.

4 Renovation, linning & concrete work in Distributries of Major Irrigation.

5 Construction of New LIP.

6 Addeption of Micro Irrigation through Drips and Sprinkler

7 Renovation of Farm Pond.

District Irrigation Plan (DIP), Jagatsinghpur Page 65

Fig. 5.7 Existing water resource of Kujanga block (River, canal, drain and water

bodies)

Sl. No Specific strategic plan

1 Constructions of field channel

2 Renovation of Dead Rivers & Constrituion of Check dams.

3 Renovation of Drainage system & construction of Check dam.

4 Renovation, linning & concrete work in Distributries of Major Irrigation.

5 Construction of New LIP.

6 Addeption of Micro Irrigation through Drips and Sprinkler

7 Renovation of Farm Pond.

District Irrigation Plan (DIP), Jagatsinghpur Page 66

Fig. 5.8 Existing water resource of Ersama block (River, canal, drain and water bodies)

Sl. No Specific strategic plan

1 Constructions of field channel

2 Renovation of Dead Rivers & Constrituion of Check dams.

3 Renovation of Drainage system & construction of Check dam.

4 Renovation, linning & concrete work in Distributries of Major Irrigation.

5 Construction of New LIP.

6 Addeption of Micro Irrigation through Drips and Sprinkler

7 Renovation of Farm Pond.

District Irrigation Plan (DIP), Jagatsinghpur Page 67

Chapter V

5 Strategic Action plan for Irrigation in District under PMKSY

S.No

Name of the

Blocks/Sub Districts

Concerned

Ministry/

Department

Component

Activity / Sources

Name of the Project / Work

Description of Work

Total Number/Capacity(cum)

Area benefited /Comman

d Area/Irri

gation Potential(

Ha)

Period of Implementation^/ 7 yrs)

Estimate d

cost(in Lakhs.)

Period of Implementation^/ 5 yrs)

16-17 17-18 18-19 19-20 20-21

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1 Jagatsinghpur

State Irrigati

on Department (

Irr. Dvn.

Jspur.)

Har khat

ko Pani

RRR (Major

Irrigation/

Machhagaon Canal)

Renovation of Disty No.19-B (Both

Bank) from RD 00 Km to 1.500 Km and

Construction of Guard wall and

outlets.

Renovation, Linning,

Earth work & Concrete

work

1 184 5 100.00 20.00 20.00 20.00 20.00 20.00

2 Jagatsinghpur

-do- -do- Renovation of

Naranpur Minor & Kendal Minor

Renovation, Linning,

Earth work & Concrete

work

1 92 5 50.00 10.00 10.00 10.00 10.00 10.00

3 Jagatsinghpur

-do- -do- -do-

Renovation ofJaisol Sub-minor,

Birampur Sub-minor & Ranahata

Sub-minor

Renovation, linning, Earth

work & Concrete

work

1 92 5 50.00 10.00 10.00 10.00 10.00 10.00

4 Jagatsinghpur

-do- -do- -do-

Renovation of Disty No.19-A1 and

Atamula Minor & Construction of

Guard wall, 2 Nos of VRB and 3 Nos of

outlets

Renovation, Linning,

Earth work & Concrete

work

1 120 5 65.00 10.00 10.00 10.00 20.00 15.00

District Irrigation Plan (DIP), Jagatsinghpur Page 68

5 Jagatsinghpur

-do- -do- -do-

Renovation of Disty No.19-A2 and

construction of Guard wall

Renovation, Linning,

Earth work & Concrete

work

1 92 5 50.00 10.00 10.00 10.00 10.00 10.00

6 Jagatsinghpur

-do- -do- -do- Renovation of

Raslpur Minor & Purana Minor

Renovation, Linning,

Earth work & Concrete

work

1 74 5 40.00 8.00 8.00 8.00 8.00 8.00

7 Jagatsinghpur

-do- -do- -do- Renovation of

Chadheigaon Minor

Renovation, Linning,

Earth work & Concrete

work

1 66 5 36.00 9.00 9.00 9.00 9.00 0.00

8 Jagatsinghpur

-do- -do- -do- Renovation of Disty

no. 19-B2

Renovation, Linning,

Earth work & Concrete

work

1 55 5 30.00 7.00 7.00 7.00 9.00 0.00

9 Jagatsinghpur

-do- -do- -do- Renovation of

Nakulanga minor and Tarkani minor

Renovation, Linning,

Earth work & Concrete

work

1 46 5 25.00 5.00 5.00 5.00 5.00 5.00

10 Jagatsinghpur

-do- -do- -do- Renovation of Disty

No.19-D

Renovation, Linning,

Earth work & Concrete

work

1 83 5 45.00 9.00 9.00 9.00 9.00 9.00

11 Jagatsinghpur

-do- -do- -do-

Renovation of Bhokanji minor &

Construction of Guard wall.

Earth work & Concrete

work 1 92 5 50.00 10.00 10.00 10.00 10.00 10.00

12 Jagatsinghpur

-do- -do- -do- Renovation of

Maindasuni Sub-minor

Renovation, Linning &

R/S & Renovation of outlets &

Drainage syphon

1 83 5 45.00 9.00 9.00 9.00 9.00 9.00

District Irrigation Plan (DIP), Jagatsinghpur Page 69

13 Jagatsinghpur

-do- -do- -do-

Construction of 2 Nos VRB near

Patenigaon and Chakuli on Disty No-

19.

Concrete 1 66 5 36.00 9.00 9.00 9.00 9.00 0.00

14 Jagatsinghpur

-do- -do- -do-

Renovation of Disty No.10-G with

construction of Guard wall.

Earth work & Concrete

work 1 147 5 80.00 20.00 20.00 20.00 10.00 10.00

15 Jagatsinghpur

-do- -do- -do-

Renovation of Jahanpur Minor &

Construction of VRB.

Renovation, Linning,

Earth work & Concrete

work

1 81 5 44.00 11.00 11.00 11.00 11.00 0.00

16 Jagatsinghpur

-do- -do- -do-

Renovation of Disty No.19-A and

construction of Guard wall

Earth work & Concrete

work 1 74 5 40.00 8.00 8.00 8.00 8.00 8.00

17 Jagatsinghpur

-do- -do- -do-

Raising & stengthening of

Disty No.19-B1 & Arana Minor.

Renovation, Linning,

Earth work & Concrete

work

1 46 5 25.00 5.00 5.00 5.00 5.00 5.00

18 Jagatsinghpur

-do- -do- -do-

Renovation of Benupur minor and

Construction of Guard wall.

Renovation, Linning,

Earth work & Concrete

work

1 74 5 40.00 8.00 8.00 8.00 8.00 8.00

19 Jagatsinghpur

-do- -do- -do-

Renovation of Patenigaon minor

and construction of Guard wall

Renovation, Linning,

Earth work & Concrete

work

1 83 5 45.00 9.00 9.00 9.00 9.00 9.00

20 Jagatsinghpur

-do- -do- -do- Renovation of Disty

No.9

Earth work & Concrete

work 1 74 5 40.00 8.00 8.00 8.00 8.00 8.00

21 Jagatsinghpur

-do- -do- -do- Renovation of Disty

No.10-B

Earth work & Concrete

work 1 184 5 100.00 20.00 20.00 20.00 20.00 20.00

22 Jagatsinghpur

-do- -do- -do- Renovation of Arilo

Sub-minor

Earth work & Concrete

work 1 64 5 35.00 7.00 7.00 7.00 7.00 7.00

District Irrigation Plan (DIP), Jagatsinghpur Page 70

23 Jagatsinghpur

-do- -do- -do- Renovation of

Kathiapada Sub-minor

Earth work & Concrete

work 1 92 5 50.00 10.00 10.00 10.00 10.00 10.00

24 Jagatsinghpur

-do- -do- -do- Renovation of Palli

minor

Earth work & Concrete

work 1 92 5 50.00 10.00 10.00 10.00 10.00 10.00

25 Jagatsinghpur

-do- -do- -do-

Renovation of Chatra minor with construction of tail

cluster.

Renovation, Linning,

Earth work & Concrete

work

1 64 5 35.00 7.00 7.00 7.00 7.00 7.00

26 Jagatsinghpur

-do- -do- -do-

Renovation of Palasa minor,

Savamul Minor & Arana Minor

Renovation, Linning,

Earth work & Concrete

work

1 111 5 60.00 15.00 15.00 15.00 15.00 0.00

27 Jagatsinghpur

-do- -do- -do-

Renovation of Sagadhua minor and

Construction of Guard wall.

Renovation, Linning,

Earth work & Concrete

work

1 111 5 60.00 15.00 15.00 15.00 15.00 0.00

28 Raghunathpur

-do- -do- -do- Renovation of Jira

Minor

Earth work & Concrete

work 1 64 5 35.00 5.00 5.00 5.00 10.00 10.00

29 Raghunathpur

-do- -do- -do- Renovation of Disty

No.8

Earth work & Concrete

work 1 74 5 40.00 8.00 8.00 8.00 8.00 8.00

30 Raghunathpur

-do- -do- -do- Renovation of Disty

No.9 & its system

Earth work & Concrete

work 1 63 5 34.00 5.00 5.00 5.00 10.00 9.00

31 Raghunathpur

-do- -do- -do-

Renovation of Disty No.7 from RD 1.00

Km to 19.000 Km & Construction of

Guard wall.

Renovation, Linning,

Earth work & Concrete

work

1 147 5 80.00 15.00 15.00 15.00 15.00 20.00

32 Raghunathpur

-do- -do- -do-

Renovation of Disty No.7-B & its system

including Construction of

Guard wall & outlets.

Renovation, Linning,

Earth work & Concrete

work

1 92 5 50.00 12.00 13.00 12.00 13.00 0.00

District Irrigation Plan (DIP), Jagatsinghpur Page 71

33 Raghunathpur

-do- -do- -do-

Renovation of Disty No.7-A & its system

including Construction of

Guard wall & outlets.

Renovation, Linning,

Earth work & Concrete

work

1 92 5 50.00 12.00 13.00 12.00 13.00 0.00

34 Raghunathpur

-do- -do- -do-

Renovation of Disty No.7-C & 7-D & its system including Construction of

Guard wall & outlets.

Renovation, Linning,

Earth work & Concrete

work

1 74 5 40.00 8.00 8.00 8.00 8.00 8.00

35 Raghunathpur

-do- -do- -do-

Renovation of Tihada Sub-minor,

Banikuda Sub-minor, Tanara Sub-minor, Khandatari Sub-minor of Disty

No.7 including Construction of

Guard wall & outlets.

Renovation, Linning,

Earth work & Concrete

work

1 53 5 29.00 8.00 8.00 8.00 5.00 0.00

36 Raghunathpur

-do- -do- -do- Renovation of Disty

No.7

Earth work & Concrete

work 1 147 5 80.00 15.00 15.00 15.00 15.00 20.00

37 Balikuda -do- -do- -do-

Renovation of Ramachandrapur

minor, Gada minor, Talakusuma,

Sarambo minor & Titinga minor

Renovation, Linning,

Earth work & Concrete

work

1 111 5 60.00 15.00 15.00 15.00 15.00 0.00

38 Balikuda -do- -do- -do-

Renovation of Disty No.13 from RD 10.500 Km to 12.300 Km &

construction of guard wall & 4 Nos

of outlet.

Renovation, Linning,

Earth work & Concrete

work

1 74 5 40.00 8.00 8.00 8.00 8.00 8.00

39 Balikuda -do- -do- -do-

Renovation of Dalana Minor with

Construction of guard wall.

Renovation, Linning,

Earth work & Concrete

work

1 55 5 30.00 6.00 6.00 6.00 6.00 6.00

District Irrigation Plan (DIP), Jagatsinghpur Page 72

40 Balikuda -do- -do- -do- Renovation of

Dalana Minor with repair of outlets.

Renovation, Linning,

Earth work & Concrete

work

1 55 5 30.00 6.00 6.00 6.00 6.00 6.00

41 Balikuda -do- -do- -do-

Renovation of Disty No.14 from RD 4.00 Km to 11.990 Km, including repair of

syphon and 4 Nos of outlets.

Renovation, Linning,

Earth work & Concrete

work

1 166 5 90.00 15.00 15.00 15.00 20.00 25.00

42 Jagatsinghpur

-do- -do- -do- Renovation of 10

G

Renovation, Linning,

Earth work & Concrete

work

1 111 5 60.00 10.00 10.00 10.00 10.00 20.00

43 Jagatsinghpur

-do- -do- -do- Renovation of Disty. No 10-E

Renovation, linning,

Earth work & Concrete

work

1 111 5 60.00 15.00 15.00 10.00 10.00 10.00

44 Jagatsinghpur

-do- -do- -do- Renovation of Disty No.10-H

Renovation, Linning,

Earth work & Concrete

work

1 111 5 60.00 15.00 15.00 10.00 10.00 10.00

45 Jagatsinghpur

-do- -do- -do- Renovation of Disty No.10-B

Renovation, Linning,

Earth work & Concrete

work

1 111 5 60.00 15.00 15.00 10.00 10.00 10.00

46 Jagatsinghpur

-do- -do- -do- Renovation of 10-

B1

Renovation, Linning,

Earth work & Concrete

work

1 74 5 40.00 8.00 8.00 8.00 8.00 8.00

47 Jagatsinghpur

-do- -do- -do- Renovation

ofDisty. No 10-C -do- 1 92 5 50.00 10.00 10.00 10.00 10.00 10.00

District Irrigation Plan (DIP), Jagatsinghpur Page 73

48 Jagatsinghpur

-do- -do- -do- Renovation of

Disty no. 10-E1

Renovation, Linning,

Earth work & Concrete

work

1 92 5 50.00 10.00 10.00 10.00 10.00 10.00

49 Jagatsinghpur

-do- -do- -do- Renovation of Disty. No 10-F

Renovation, Linning,

Earth work & Concrete

work

1 46 5 25.00 5.00 5.00 5.00 5.00 5.00

50 Jagatsinghpur

-do- -do- -do- Renovation

ofChatra Feeder

Renovation, Linning,

Earth work & Concrete

work

1 92 5 50.00 10.00 10.00 10.00 10.00 10.00

51 Jagatsinghpur

-do- -do- -do- Renovation of Disty. No 12

Renovation, Linning,

Earth work & Concrete

work

1 55 5 30.00 10.00 10.00 10.00 0.00 0.00

52 Jagatsinghpur

-do- -do- -do- Renovation of

Arilo Sub minor

Renovation, Linning,

Earth work & Concrete

work

1 74 5 40.00 10.00 10.00 10.00 10.00 0.00

53 Jagatsinghpur

-do- -do- -do- Renovation of Disty. No 11

Renovation, Linning,

Earth work & Concrete

work

1 55 5 30.00 10.00 10.00 10.00 0.00 0.00

54 Jagatsinghpur

-do- -do- -do- Renovation of Kusinga Minor

Renovation, Linning,

Earth work & Concrete

work

1 55 5 30.00 0.00 10.00 10.00 10.00 0.00

Total ( Irr. Dvn. Jspur.) 54 4788 270 2599 545 557 540 536 421

District Irrigation Plan (DIP), Jagatsinghpur Page 74

1 Biridi

State Irrigation Departme

nt ( Irr. Div.

Mahandi South)

Har khet Ko

pani

RRR (Major

Irrigation/

Taladanda

Canal)

Canals system / Disty. Minor & S/M

Repair, restoration & Renovation

1 3684 5 2000 500 500 500 500 0

Tirtol ( Irr. Div. Mahandi South) 1 3684 5 2000 500 500 500 500 0

1 Jagatsinghpur

Drainage

Har khet Ko

pani

(RRR) Alaka D/C

Imp. to Alaka D/C Renovation of the drain

1 0 3 750.00 300.00 300.00 150.00 0.00 0.00

2 Jagatsinghpur

Drainage

(RRR) Brudha

D/C

Imp. to Bionl Drainage Channel

Renovation of the drain

1 0 1 50.00 50.00 0.00 0.00 0.00 0.00

3 Jagatsinghpur

Drainage

(RRR) Gobari

D/C

Imp. to Bhokanji Drainage Channel

Renovation of the drain

1 0 1 40.00 40.00 0.00 0.00 0.00 0.00

4 Jagatsinghpur

Drainage -do- (RRR) Gobari

D/C

Imp. to Patenigan Drainage Channel

Renovation of the drain

1 0 1 30.00 0.00 0.00 0.00 30.00 0.00

5 Jagatsinghpur

Drainage -do- (RRR) Gobari

D/C

Imp. to Kodal Drainage Channel

Renovation of the drain

1 0 1 30.00 0.00 0.00 0.00 0.00 30.00

6 Jagatsinghpur

Drainage -do- (RRR) Gobari

D/C

Imp. to Ekasudha Drainage Channel

Renovation of the drain

1 0 1 30.00 0.00 30.00 0.00 0.00 0.00

7 Jagatsinghpur

Drainage -do- (RRR) Gobari

D/C

Imp. to Mandasahi Drainage Channel

Renovation of the drain

1 0 1 20.00 20.00 0.00 0.00 0.00 0.00

8 Jagatsinghpur

Drainage -do- -do- Imp. to Tampua

Drainage Channel Renovation of the drain

1 0 1 25.00 25.00 0.00 0.00 0.00 0.00

9 Jagatsinghpur

Drainage -do- (RRR)

Devi river Imp. to Gobari

Drainage Channel Renovation of the drain

1 0 5 1860.98 400.00 400.00 400.00 400.00 260.98

10 Jagatsinghpur

Drainage -do- (RRR) Gobari

D/C

Imp. to Madhusudanpur

Drainage Channel

Renovation of the drain

1 0 1 30.00 0.00 0.00 0.00 0.00 30.00

District Irrigation Plan (DIP), Jagatsinghpur Page 75

11 Jagatsinghpur

Drainage -do- (RRR) Gobari

D/C

Imp. to Madhusudanpur

Drainage Channel

Renovation of the drain

1 0 1 30.00 0.00 0.00 0.00 30.00 0.00

12 Jagatsinghpur

Drainage -do- (RRR) Gobari

D/C

Imp. to Benukanda

Drainage Channel

Renovation of the drain

1 0 1 30.00 0.00 0.00 30.00 0.00 0.00

13 Jagatsinghpur

Drainage -do- (RRR) Gobari

D/C

Imp. to Patoli Drainage Channel

Renovation of the drain

1 0 1 30.00 0.00 30.00 0.00 0.00 0.00

14 Jagatsinghpur

Drainage -do- (RRR)Hansua D/C

Imp. to Taradapada

(From 40.76 km to 96.37 km) (

Jaipur to Jatadhari Muhan)

Renovation of the drain

1 0 1 30.00 30.00 0.00 0.00 0.00 0.00

15 Jagatsinghpur

Drainage -do- (RRR)Nagpur D/C

Imp. to Kherasa (From 40.76 km

to 96.37 km) ( Jaipur to

Jatadhari Muhan)

Renovation of the drain

1 0 1 30.00 30.00 0.00 0.00 0.00 0.00

16 Jagatsinghpur

Drainage -do- (RRR)Nagpur D/C

Imp. to Dighi (From 40.76 km

to 96.37 km) ( Jaipur to

Jatadhari Muhan)

Renovation of the drain

1 0 1 30.00 0.00 30.00 0.00 0.00 0.00

17 Jagatsinghpur

Drainage -do- (RRR)

Hansua D/C

Imp. to Sidhal (From 40.76 km

to 96.37 km) ( Jaipur to

Jatadhari Muhan)

Renovation of the drain

1 0 1 35.00 0.00 0.00 35.00 0.00 0.00

18 Jagatsinghpur

Drainage -do- (RRR)

Nagpur D/C

Imp. to Gamutipur (From 40.76 km to 96.37 km) (

Jaipur to Jatadhari Muhan)

Renovation of the drain

1 0 1 30.00 0.00 0.00 0.00 30.00 0.00

19 Jagatsinghpur

Drainage -do- (RRR)

Hansua D/C

Imp. to Chheligagarh to Rankei Drainage

Channel

Renovation of the drain

1 0 1 30.00 0.00 0.00 0.00 0.00 30.00

District Irrigation Plan (DIP), Jagatsinghpur Page 76

20 Jagatsinghpur

Drainage -do- (RRR)

Hansua D/C

Imp. to Madhupur Rankei Drainage

Channel

Renovation of the drain

1 0 1 55.00 55.00 0.00 0.00 0.00 0.00

21 Jagatsinghpur

Drainage -do- (RRR)

Hansua D/C

Imp. to Tira to Rankei Drainage

Channel

Renovation of the drain

1 0 1 40.00 0.00 40.00 0.00 0.00 0.00

22 Jagatsinghpur

Drainage -do- (RRR)

Brudha D/C

Imp. to Harsinghpur

Dr.Cut

Renovation of the drain

1 0 1 50.00 0.00 0.00 50.00 0.00 0.00

23 Jagatsinghpur

Drainage -do- (RRR)

Biluakhai river

Imp. to Gaichara D/C

Renovation of the drain

1 0 1 60.00 0.00 0.00 0.00 60.00 0.00

24 Jagatsinghpur

Drainage -do- (RRR)

Madhapur D/C

Imp. to Puakhai D/C

Renovation of the drain

1 0 1 30.00 0.00 0.00 0.00 0.00 30.00

25 Raghunathpur

Drainage -do- (RRR)

Hansua D/C

Imp. to Barapata Drainage Cut

Renovation of the drain

1 0 1 40.00 40.00 0.00 0.00 0.00 0.00

26 Raghunathpur

Drainage -do- (RRR)

Hansua D/C

Imp. to D/C from Puruna Syphone

to Odapad

Renovation of the drain

1 0 1 50.00 0.00 50.00 0.00 0.00 0.00

27 Raghunathpur

Drainage -do- (RRR)

Hansua D/C

Imp. to Jagannathpur to

Barti

Renovation of the drain

1 0 1 50.00 0.00 0.00 50.00 0.00 0.00

28 Raghunathpur

Drainage -do- (RRR)

Hansua D/C

Imp. to Drainage Cut from Barti to

Kortanga

Renovation of the drain

1 0 1 50.00 0.00 0.00 0.00 50.00 0.00

29 Raghunathpur

Drainage -do- (RRR)

Hansua D/C

Imp. to D/C from Tanara to Dead

Kathjori

Renovation of the drain

1 0 1 40.00 0.00 0.00 0.00 0.00 40.00

30 Raghunathpur

Drainage -do- (RRR)

Hansua D/C

Imp. to Drainage Cut from

Talapatak to Raipat

Renovation of the drain

1 0 1 100.00 100.00 0.00 0.00 0.00 0.00

31 Raghunathpur

Drainage -do- (RRR)

Hansua D/C

Imp. to Drainage Cut from

Sadheikana Nala

Renovation of the drain

1 0 1 40.00 0.00 40.00 0.00 0.00 0.00

District Irrigation Plan (DIP), Jagatsinghpur Page 77

32 Raghunathpur

Drainage -do- (RRR)

Hansua D/C

Imp. to Drainage Cut from Satapura

to Jaisol

Renovation of the drain

1 0 1 50.00 0.00 0.00 50.00 0.00 0.00

33 Raghunathpur

Drainage -do- (RRR)

Hansua D/C

Imp. to Drainage Cut from Bada

Korakara to Salijanga

Renovation of the drain

1 0 1 100.00 0.00 0.00 0.00 100.00 0.00

34 Raghunathpur

Drainage -do- (RRR)

Hansua D/C

Imp. to D/C from Bodar Syphone to

Hansua

Renovation of the drain

1 0 1 105.00 0.00 0.00 0.00 0.00 105.00

35 Raghunathpur

Drainage -do- (RRR)

Hansua D/C

Imp. to D/C from Sudhabhuin to Jaganathapur

Renovation of the drain

1 0 1 20.00 0.00 0.00 0.00 0.00 20.00

36 Raghunathpur

Drainage -do- (RRR)

Hansua D/C

Imp. to D/C from Raghunathpur

Syphone to Hansua

Renovation of the drain

1 0 1 50.00 0.00 0.00 0.00 50.00 0.00

37 Raghunathpur

Drainage -do- (RRR)

Hansua D/C

Imp. to D/C from Barti to Kurtang to

Chikinia to Kalajhari to Harishpur

Renovation of the drain

1 0 1 110.00 110.00 0.00 0.00 0.00 0.00

38 Raghunathpur

Drainage -do- (RRR)

Hansua D/C

Imp. to D/C from Bhoipada to Radhanagar

Renovation of the drain

1 0 1 110.00 0.00 110.00 0.00 0.00 0.00

39 Raghunathpur

Drainage -do- (RRR)

Hansua D/C

Imp. to D/C from Follar Across South

Channel

Renovation of the drain

1 0 1 20.00 0.00 0.00 20.00 0.00 0.00

40 Raghunathpur

Drainage -do- (RRR)

Hansua D/C

Imp. to D/C from Samantarapur to

Boohapur

Renovation of the drain

1 0 1 40.00 0.00 0.00 0.00 40.00 0.00

41 Raghunathpur

Drainage -do- (RRR)

Hansua D/C

Imp. to Hansua Main Drainage Channel

from 0.00 Km to 40.76

Km.

Renovation of the drain

1 0 2 1000.00 500.00 500.00 0.00 0.00 0.00

42 Raghunathpur

Drainage -do- (RRR)

Hansua D/C

Imp. to D/C from Sompur to Talalapada

Syphone

Renovation of the drain

1 0 1 105.00 0.00 0.00 105.00 0.00 0.00

District Irrigation Plan (DIP), Jagatsinghpur Page 78

43 Raghunathpur

Drainage -do- (RRR)

Brudha D/C

Imp. to Kothakana D/C

Renovation of the drain

1 0 1 105.00 0.00 0.00 0.00 105.00 0.00

44 Raghunathpur

Drainage -do- -do- Imp. to Jamarai

D/C Renovation of the drain

1 0 1 35.00 0.00 0.00 0.00 0.00 35.00

45 Raghunathpur

Drainage -do- (RRR)

Madhapur D/C

Imp. to Majurai D/C

Renovation of the drain

1 0 1 30.00 30.00 0.00 0.00 0.00 0.00

46 Raghunathpur

Drainage -do- (RRR)

Paika D/C Imp. to Baliapatta

D/C Renovation of the drain

1 0 1 30.00 0.00 30.00 0.00 0.00 0.00

47 Raghunathpur

Drainage -do- (RRR)

Hansua D/C

Imp. to Kruamanga D/C

Renovation of the drain

1 0 1 30.00 0.00 0.00 30.00 0.00 0.00

48 Raghunathpur

Drainage -do- -do- Imp. to

Adheikurla D/C Renovation of the drain

1 0 1 30.00 0.00 0.00 0.00 30.00 0.00

49 Raghunathpur

Drainage -do- -do- Imp. to Nadiakhai

D/C Renovation of the drain

1 0 1 30.00 0.00 0.00 0.00 0.00 30.00

50 Raghunathpur

Drainage -do- -do- Imp. to Gopalpur

D/C Renovation of the drain

1 0 1 30.00 30.00 0.00 0.00 0.00 0.00

51 Raghunathpur

Drainage -do- -do- Imp. to

Khandatori D/C Renovation of the drain

1 0 1 30.00 0.00 30.00 0.00 0.00 0.00

52 Balikuda Drainage -do- (RRR)

Devi river

Imp. to link drains & Sub-Drains of

Balipatana to Balijori (Sarunai)

D/S

Renovation of the drain

1 0 1 551.25 151.25 100.00 100.00 100.00 100.00

53 Balikuda Drainage -do- (RRR)

Devi river

Imp. to Mugura nala & it's 3 nos

link drains

Renovation of the drain

1 0 3 546.36 200.00 200.00 146.36 0.00 0.00

54 Balikuda Drainage -do- (RRR) Alaka D/C

Imp. to 6 nos. of link drains of

Alaka D/S (Gaiparia,

Gatiswarapur, Alabari, D/C No.

68 and Thailo Titira)

Renovation of the drain

1 0 2 170.23 0.00 0.00 0.00 100.00 70.23

District Irrigation Plan (DIP), Jagatsinghpur Page 79

55 Balikuda Drainage -do- (RRR) Alaka D/C

Imp. to Old Alaka D/C

Renovation of the drain

1 0 2 250.21 150.00 100.21 0.00 0.00 0.00

56 Balikuda Drainage -do- (RRR) Alaka D/C

Imp. to Tuntuna D/C

Renovation of the drain

1 0 1 60.55 0.00 0.00 60.55 0.00 0.00

57 Balikuda Drainage -do- (RRR) Alaka D/C

Imp. to Tihudi Rahane D/C

Renovation of the drain

1 0 2 80.30 0.00 0.00 0.00 40.00 40.30

58 Balikuda Drainage -do- (RRR) Alaka D/C

Imp. to Ambasala Rahane D/C

Renovation of the drain

1 0 1 70.75 0.00 0.00 70.75 0.00 0.00

59 Balikuda Drainage -do- (RRR)

Hansua D/C

Imp. to Gadarmala D/C

Renovation of the drain

1 0 1 65.12 0.00 65.12 0.00 0.00 0.00

60 Biridi Drainage -do- (RRR)

Hansua D/C

Imp. to Drainage Cut from Jaisol to

Hansua

Renovation of the drain

1 0 1 50.00 50.00 0.00 0.00 0.00 0.00

61 Biridi Drainage -do- (RRR)

Hansua D/C

Imp. to Drainage Cut from Balia to

Jaisol

Renovation of the drain

1 0 1 30.00 0.00 30.00 0.00 0.00 0.00

62 Biridi Drainage -do- (RRR)

Hansua D/C

Imp. to D/C from Tarikunda to

Banikunda

Renovation of the drain

1 0 1 40.00 0.00 0.00 40.00 0.00 0.00

63 Biridi Drainage -do- (RRR)

Hansua D/C

Imp. to D/C from Batimira to

Mahatol

Renovation of the drain

1 0 1 85.00 0.00 0.00 50.00 35.00 0.00

64 Biridi Drainage -do- (RRR) Gobari

D/C

Imp. to Adhanga Drainage Channel

Renovation of the drain

1 0 1 50.00 0.00 0.00 0.00 0.00 50.00

65 Naugaon Drainage -do- (RRR) Gobari

D/C

Imp. to link drains of Gobari D/S

Renovation of the drain

1 0 1 60.19 0.00 60.19 0.00 0.00 0.00

66 Naugaon Drainage -do- (RRR) Gobari

D/C

Imp. to Palasa Drainage Channel

Renovation of the drain

1 0 1 40.00 40.00 0.00 0.00 0.00 0.00

67 Naugaon Drainage -do- (RRR) Gobari

D/C

Imp. to Sainto Drainage Channel

Renovation of the drain

1 0 1 40.00 0.00 40.00 0.00 0.00 0.00

District Irrigation Plan (DIP), Jagatsinghpur Page 80

68 Naugaon Drainage -do- (RRR) Gobari

D/C

Imp. to Rohia Drainage Channel

Renovation of the drain

1 0 1 30.00 0.00 0.00 30.00 0.00 0.00

69 Naugaon Drainage -do- (RRR) Gobari

D/C

Imp. to Andhuti Drainage Channel

Renovation of the drain

1 0 1 25.00 0.00 0.00 0.00 25.00 0.00

70 Naugaon Drainage -do- (RRR)

Madhapur D/C

Imp. to Nandan (From 40.76 km

to 96.37 km) ( Jaipur to

Jatadhari Muhan)

Renovation of the drain

1 0 1 30.00 0.00 0.00 0.00 0.00 30.00

71 Naugaon Drainage -do- (RRR)

Hansua D/C

Imp. to Itang (From 40.76 km

to 96.37 km) ( Jaipur to

Jatadhari Muhan)

Renovation of the drain

1 0 2 60.00 30.00 30.00 0.00 0.00 0.00

72 Naugaon Drainage -do- (RRR) Gobari

D/C

Imp. to Asilo Dr.Cut

Renovation of the drain

1 0 1 40.00 0.00 0.00 40.00 0.00 0.00

73 Naugaon Drainage -do- (RRR) Gobari

D/C

Imp. to Dahanikhia D/C

Renovation of the drain

1 0 1 30.00 0.00 0.00 0.00 30.00 0.00

74 Naugaon Drainage -do- (RRR)

Devi river Imp. to Gobari

D/C Renovation of the drain

1 0 5 2000.00 400.00 400.00 400.00 400.00 400.00

75 Naugaon Drainage -do- (RRR)

Devi river Imp. to Bausajori

D/C Renovation of the drain

1 0 2 500.00 250.00 250.00 0.00 0.00 0.00

76 Tirtol Drainage -do- (RRR)

Hansua D/C

Imp. to Singarpur to Rankei

Drainage Channel

Renovation of the drain

1 0 1 30.00 0.00 0.00 30.00 0.00 0.00

77 Tirtol Drainage -do- (RRR)

Brudha D/C

Imp. to Chhapada D/C

Renovation of the drain

1 0 1 30.00 0.00 0.00 0.00 30.00 0.00

78 Tirtol Drainage -do- (RRR)

Brudha D/C

Imp. to Jaipur D/C Renovation of the drain

1 0 1 30.00 0.00 0.00 0.00 0.00 30.00

79 Tirtol Drainage -do- (RRR)

Brudha D/C

Imp. to Dandasahi D/C

Renovation of the drain

1 0 1 40.00 0.00 0.00 0.00 40.00 0.00

District Irrigation Plan (DIP), Jagatsinghpur Page 81

80 Tirtol Drainage -do- (RRR)

Brudha D/C

Imp. to Tirtol D/C Renovation of the drain

1 0 1 30.00 0.00 0.00 30.00 0.00 0.00

81 Tirtol Drainage -do- (RRR)

Hansua D/C

Imp. to Sadhusahi D/C

Renovation of the drain

1 0 1 30.00 0.00 30.00 0.00 0.00 0.00

82 Tirtol Drainage -do- (RRR)

Hansua D/C

Imp. to Athagotari D/C

Renovation of the drain

1 0 1 30.00 30.00 0.00 0.00 0.00 0.00

83 Tirtol Drainage -do- (RRR) Gobari

D/C

Imp. to Madanpur D/C

Renovation of the drain

1 0 1 30.00 30.00 0.00 0.00 0.00 0.00

84 Kujanga Drainage -do- (RRR)

Santara D/C

Imp. to Santara D/C

Renovation of the drain

1 0 3 400.77 150.00 150.00 100.77 0.00 0.00

85 Kujanga Drainage -do- (RRR)

Santara D/C

Imp. to Balia D/C Renovation of the drain

1 0 3 300.44 100.00 100.00 100.44 0.00 0.00

86 Kujanga Drainage -do- (RRR)

Mahanga D/C

Imp. to Udayachandapur

D/C

Renovation of the drain

1 0 2 85.00 40.00 45.00 0.00 0.00 0.00

87 Kujanga Drainage -do- (RRR)

Mahanga D/C

Imp. to Gadakujanga D/C

Renovation of the drain

1 0 1 30.00 0.00 30.00 0.00 0.00 0.00

88 Erasama Drainage -do- (RRR)

Mahanga D/C

Imp. to Mahanga nallah and its

system

Renovation of the drain

1 0 5 1065.00 200.00 200.00 200.00 200.00 265.00

89 Erasama Drainage -do- (RRR) Alaka D/C

Imp. to link drains & Sub-drains of

Sankha and Kamalapaka D/S

Renovation of the drain

1 0 1 250.45 250.45 0.00 0.00 0.00 0.00

90 Erasama Drainage -do- (RRR)

Hansua D/C

Imp. to 10 nos. of drains in Erasama block in Doab No-

1

Renovation of the drain

1 0 3 472.61 0.00 200.00 200.00 72.61 0.00

91 Erasama Drainage -do- (RRR)

Mahanga D/C

Imp. to Kanaguli Khurant D/C

Renovation of the drain

1 0 2 95.65 0.00 0.00 0.00 50.00 45.65

District Irrigation Plan (DIP), Jagatsinghpur Page 82

92 Erasama Drainage -do- (RRR)

Adhanga D/C

Imp. to Tanra Pokhariapada D/C

Renovation of the drain

1 0 1 75.45 0.00 0.00 75.45 0.00 0.00

93 Erasama Drainage -do- (RRR) Tigiria

D/C

Imp. to Telegunia D/C

Renovation of the drain

1 0 2 95.89 50.00 45.89 0.00 0.00 0.00

94 Erasama Drainage -do- (RRR)

Brudha D/C

Imp. to Kantapada Sundarkani D/C

Renovation of the drain

1 0 2 100.86 0.00 0.00 50.00 50.86 0.00

95 Erasama Drainage -do- (RRR) Tigiria

D/C

Imp. to Gunthiapata D/C

Renovation of the drain

1 0 1 40.36 0.00 0.00 0.00 0.00 40.36

96 Erasama Drainage -do- (RRR) Tigiria

D/C Imp. to Kiada D/C

Renovation of the drain

1 0 1 49.77 0.00 0.00 0.00 49.77 0.00

97 Erasama Drainage -do- (RRR)

Hansua D/C

Imp. to Barakolia D/C

Renovation of the drain

1 0 1 36.67 0.00 0.00 36.67 0.00 0.00

98 Erasama Drainage -do- (RRR)

Hansua D/C

Imp. to Japa to Kasiabelari D/C

Renovation of the drain

1 0 1 12.11 12.11 0.00 0.00 0.00 0.00

99 Erasama Drainage -do- (RRR) Tigiria

D/C

Imp. to Sunadiha D/C

Renovation of the drain

1 0 1 53.32 0.00 53.32 0.00 0.00 0.00

100

Erasama Drainage -do- (RRR)

Hansua D/C

Imp. to Hansua D/C

Renovation of the drain

1 0 5 500.75 100.00 100.00 100.00 100.00 100.75

101

Erasama Drainage -do- (RRR)

Mahanga D/C

Imp. to Kuranta to Balitutha D/C

Renovation of the drain

1 0 1 74.13 74.13 0.00 0.00 0.00 0.00

102

Erasama Drainage -do- (RRR)

Brudha D/C

Imp. to Basulei nala

Renovation of the drain

1 0 3 165.55 0.00 50.00 50.00 65.55 0.00

103

Erasama Drainage -do- (RRR)

Brudha D/C

Imp. to Tigiria nala

Renovation of the drain

1 0 3 270.43 0.00 100.00 100.00 70.43 0.00

District Irrigation Plan (DIP), Jagatsinghpur Page 83

104

Erasama Drainage -do- (RRR)

Adhanga D/C

Imp. to Nuapada nala

Renovation of the drain

1 0 1 32.00 32.00 0.00 0.00 0.00 0.00

105

Erasama Drainage -do- (RRR)

Brudha D/C

Imp. to Brudha D/C

Renovation of the drain

1 0 5 1000.00 200.00 200.00 200.00 200.00 200.00

Total Drainage RRR 105 0 149 16168.

15 4299.94 4169.73

3130.99

2584.22 1983.2

7

Total HKK

P RRR 160 8472 424

20767.15

5344.94 5226.73 4170.9

9 3620.22

2404.27

1 Jagatsinghpur

Drainage Har khet Ko

pani

Alaka D/C

Imp. to Alaka D/C Construction of check

dam 18 180 2 250.00 150.00 100.00 0.00 0.00 0.00

2 Jagatsinghpur

Drainage Gobari

D/C Imp. to Bhokanji

Drainage Channel check dam 1 10 1 15.00 15.00 0.00 0.00 0.00 0.00

3 Jagatsinghpur

Drainage -do- Gobari

D/C Imp. to Mandasahi Drainage Channel

check dam 1 10 1 10.00 10.00 0.00 0.00 0.00 0.00

4 Jagatsinghpur

Drainage -do- Devi river Imp. to Gobari

Drainage Channel check dam 11 110 1 200.00 200.00 0.00 0.00 0.00 0.00

5 Jagatsinghpur

Drainage -do- Gobari

D/C

Imp. to Madhusudanpur

Drainage Channel check dam 1 10 1 10.00 10.00 0.00 0.00 0.00 0.00

6 Jagatsinghpur

Drainage -do- Gobari

D/C

Imp. to Madhusudanpur

Drainage Channel check dam 1 10 1 10.00 10.00 0.00 0.00 0.00 0.00

7 Jagatsinghpur

Drainage -do- Nagpur

D/C

Imp. to Kherasa (From 40.76 km

to 96.37 km) ( Jaipur to

Jatadhari Muhan)

check dam 1 10 1 10.00 10.00 0.00 0.00 0.00 0.00

8 Jagatsinghpur

Drainage -do- Nagpur

D/C

Imp. to Dighi (From 40.76 km

to 96.37 km) ( Jaipur to

Jatadhari Muhan)

check dam 1 10 1 10.00 0.00 10.00 0.00 0.00 0.00

District Irrigation Plan (DIP), Jagatsinghpur Page 84

9 Jagatsinghpur

Drainage -do- Hansua

D/C

Imp. to Sidhal (From 40.76 km

to 96.37 km)( Jaipur to Jatadhari

Muhan)

check dam 2 20 1 35.00 0.00 35.00 0.00 0.00 0.00

10 Jagatsinghpur

Drainage -do- Nagpur

D/C

Imp. to Gamutipur (From 40.76 km to 96.37 km) (

Jaipur to Jatadhari Muhan)

check dam 1 10 1 10.00 0.00 0.00 10.00 0.00 0.00

11 Jagatsinghpur

Drainage -do- Hansua

D/C

Imp. to Chheligagarh to Rankei Drainage

Channel

check dam 1 10 1 10.00 0.00 0.00 10.00 0.00 0.00

12 Jagatsinghpur

Drainage -do- Hansua

D/C

Imp. to Madhupur Rankei Drainage

Channel check dam 3 30 1 45.00 0.00 0.00 45.00 0.00 0.00

13 Jagatsinghpur

Drainage -do- Brudha

D/C

Imp. to Harsinghpur

Dr.Cut check dam 1 10 1 15.00 0.00 0.00 15.00 0.00 0.00

14 Jagatsinghpur

Drainage -do- Biluakhai

river Imp. to Gaichara

D/C check dam 2 20 1 40.00 0.00 0.00 40.00 0.00 0.00

15 Jagatsinghpur

Drainage -do- Madhapu

r D/C Imp. to Puakhai

D/C check dam 1 10 1 10.00 0.00 0.00 0.00 10.00 0.00

16 Raghunathpur

Drainage -do- Hansua

D/C

Imp. to D/C from Puruna Syphone

to Odapad check dam 1 10 1 10.00 0.00 0.00 0.00 10.00 0.00

17 Raghunathpur

Drainage -do- Hansua

D/C

Imp. to Jagannathpur to

Barti check dam 1 10 1 10.00 0.00 0.00 0.00 10.00 0.00

18 Raghunathpur

Drainage -do- Hansua

D/C

Imp. to Drainage Cut from

Talapatak to Raipat

check dam 1 10 1 15.00 0.00 0.00 0.00 15.00 0.00

19 Raghunathpur

Drainage -do- Hansua

D/C

Imp. to Drainage Cut from Satapura

to Jaisol check dam 1 10 1 15.00 0.00 0.00 0.00 15.00 0.00

District Irrigation Plan (DIP), Jagatsinghpur Page 85

20 Raghunathpur

Drainage -do- Hansua

D/C

Imp. to Drainage Cut from Bada

Korakara to Salijanga

check dam 1 10 1 15.00 0.00 0.00 0.00 15.00 0.00

21 Raghunathpur

Drainage -do- Hansua

D/C

Imp. to D/C from Bodar Syphone to

Hansua check dam 1 10 1 15.00 0.00 0.00 0.00 15.00 0.00

22 Raghunathpur

Drainage -do- Hansua

D/C

Imp. to D/C from Raghunathpur

Syphone to Hansua

check dam 1 10 1 15.00 0.00 0.00 0.00 15.00 0.00

23 Raghunathpur

Drainage -do- Hansua

D/C

Imp. to D/C from Barti to Kurtang

to Chikinia to Kalajhari to Harishpur

check dam 2 20 1 40.00 0.00 0.00 0.00 40.00 0.00

24 Raghunathpur

Drainage -do- Hansua

D/C

Imp. to D/C from Bhoipada to Radhanagar

check dam 2 20 1 40.00 40.00 0.00 0.00 0.00 0.00

25 Raghunathpur

Drainage -do- Hansua

D/C

Imp. to Hansua Main Drainage Channel from

0.00 Km to 40.76 Km.

check dam 13 130 3 325.00 125.00 100.00 100.00 0.00 0.00

26 Raghunathpur

Drainage -do- Hansua

D/C

Imp. to D/C from Sompur to Talalapada

Syphone

check dam 1 10 1 15.00 15.00 0.00 0.00 0.00 0.00

27 Raghunathpur

Drainage -do- Brudha

D/C Imp. to Kothakana

D/C check dam 1 10 1 15.00 0.00 15.00 0.00 0.00 0.00

28 Raghunathpur

Drainage -do- Brudha

D/C Imp. to Jamarai

D/C check dam 1 10 15.00 0.00 0.00 15.00 0.00 0.00

29 Raghunathpur

Drainage -do- Madhapu

r D/C Imp. to Majurai

D/C check dam 1 10 10.00 10.00 0.00 0.00 0.00 0.00

30 Raghunathpur

Drainage -do- Paika D/C Imp. to Baliapatta

D/C check dam 1 10 10.00 0.00 10.00 0.00 0.00 0.00

31 Raghunathpur

Drainage -do- Hansua

D/C Imp. to

Kruamanga D/C check dam 1 10 10.00 0.00 0.00 10.00 0.00 0.00

District Irrigation Plan (DIP), Jagatsinghpur Page 86

32 Raghunathpur

Drainage -do- Hansua

D/C Imp. to

Adheikurla D/C check dam 1 10 10.00 0.00 0.00 0.00 10.00 0.00

33 Raghunathpur

Drainage -do- Hansua

D/C Imp. to Nadiakhai

D/C check dam 1 10 10.00 0.00 0.00 0.00 10.00 0.00

34 Raghunathpur

Drainage -do- Hansua

D/C Imp. to Gopalpur

D/C check dam 1 10 10.00 0.00 0.00 0.00 10.00 0.00

35 Raghunathpur

Drainage -do- Hansua

D/C Imp. to

Khandatori D/C check dam 1 10 10.00 0.00 0.00 0.00 10.00 0.00

36 Balikuda Drainage -do- Devi river

Imp. to link drains & Sub-Drains of

Balipatana to Balijori (Sarunai)

D/S

check dam 7 70 150.00 100.00 50.00 0.00 0.00 0.00

37 Balikuda Drainage -do- Devi river Imp. to Mugura nala & it's 3 nos

link drains check dam 8 80 200.00 0.00 0.00 100.00 100.00 0.00

38 Balikuda Drainage -do- Alaka D/C

Imp. to 6 nos. of link drains of

Alaka D/S (Gaiparia,

Gatiswarapur, Alabari, D/C No.

68 and Thailo Titira)

check dam 6 60 100.00 0.00 0.00 0.00 0.00 100.00

39 Balikuda Drainage -do- Alaka D/C

Imp. to Old Alaka D/C

check dam 2 20 50.00 50.00 0.00 0.00 0.00 0.00

40 Balikuda Drainage -do- Alaka D/C

Imp. to Tuntuna D/C

check dam 1 10 15.00 0.00 15.00 0.00 0.00 0.00

41 Balikuda Drainage -do- Alaka D/C

Imp. to Tihudi Rahane D/C

check dam 3 30 50.00 0.00 0.00 50.00 0.00 0.00

42 Balikuda Drainage -do- Alaka D/C

Imp. to Ambasala Rahane D/C

check dam 3 30 50.00 0.00 50.00 0.00 0.00 0.00

43 Biridi Drainage -do- Hansua

D/C

Imp. to Drainage Cut from Jaisol to

Hansua check dam 1 10 15.00 0.00 0.00 15.00 0.00 0.00

44 Biridi Drainage -do- Hansua

D/C

Imp. to Drainage Cut from Balia to

Jaisol check dam 1 10 10.00 10.00 0.00 0.00 0.00 0.00

District Irrigation Plan (DIP), Jagatsinghpur Page 87

45 Biridi Drainage -do- Hansua

D/C

Imp. to D/C from Tarikunda to

Banikunda check dam 1 10 10.00 0.00 10.00 0.00 0.00 0.00

46 Biridi Drainage -do- Hansua

D/C

Imp. to D/C from Batimira to

Mahatol check dam 1 10 15.00 0.00 0.00 0.00 15.00 0.00

47 Biridi Drainage -do- Gobari

D/C Imp. to Adhanga

Drainage Channel check dam 1 10 15.00 0.00 0.00 0.00 0.00 15.00

48 Naugaon Drainage -do- Gobari

D/C Imp. to Tampua

Drainage Channel check dam 2 20 25.00 25.00 0.00 0.00 0.00 0.00

49 Naugaon Drainage -do- Gobari

D/C Imp. to link drains

of Gobari D/S check dam 2 20 40.00 40.00 0.00 0.00 0.00 0.00

50 Naugaon Drainage -do- Gobari

D/C Imp. to Rohia

Drainage Channel check dam 1 10 10.00 0.00 10.00 0.00 0.00 0.00

51 Naugaon Drainage -do- Gobari

D/C Imp. to Andhuti

Drainage Channel check dam 9 90 150.00 0.00 0.00 100.00 50.00 0.00

52 Naugaon Drainage -do- Madhapu

r D/C

Imp. to Nandan (From 40.76 km

to 96.37 km) ( Jaipur to

Jatadhari Muhan)

check dam 1 10 10.00 0.00 10.00 0.00 0.00 0.00

53 Naugaon Drainage -do- Hansua

D/C

Imp. to Itang (From 40.76 km

to 96.37 km) ( Jaipur to

Jatadhari Muhan)

check dam 1 10 15.00 0.00 0.00 15.00 0.00 0.00

54 Naugaon Drainage -do- Gobari

D/C Imp. to

Dahanikhia D/C check dam 1 10 10.00 10.00 0.00 0.00 0.00 0.00

55 Naugaon Drainage -do- Devi river Imp. to Gobari

D/C check dam 9 90 225.00 125.00 100.00 0.00 0.00 0.00

56 Naugaon Drainage -do- Devi river Imp. to Bausajori

D/C check dam 5 50 125.00 0.00 0.00 125.00 0.00 0.00

57 Tirtol Drainage -do- Hansua

D/C

Imp. to Singarpur to Rankei

Drainage Channel check dam 4 40 70.00 0.00 0.00 0.00 70.00 0.00

58 Tirtol Drainage -do- Brudha

D/C Imp. to Chhapada

D/C check dam 1 10 10.00 0.00 0.00 0.00 0.00 10.00

District Irrigation Plan (DIP), Jagatsinghpur Page 88

59 Tirtol Drainage -do- Brudha

D/C Imp. to Jaipur D/C check dam 1 10 10.00 10.00 0.00 0.00 0.00 0.00

60 Tirtol Drainage -do- Brudha

D/C Imp. to Tirtol D/C check dam 1 10 10.00 0.00 10.00 0.00 0.00 0.00

61 Tirtol Drainage -do- Hansua

D/C Imp. to Sadhusahi

D/C check dam 1 10 10.00 0.00 0.00 10.00 0.00 0.00

62 Tirtol Drainage -do- Hansua

D/C Imp. to Athagotari

D/C check dam 1 10 10.00 0.00 0.00 0.00 10.00 0.00

63 Tirtol Drainage -do- Gobari

D/C Imp. to Madanpur

D/C check dam 1 10 10.00 0.00 0.00 0.00 10.00 0.00

64 Kujanga Drainage -do- Santara

D/C Imp. to Santara

D/C check dam 2 20 42.00 0.00 0.00 0.00 0.00 42.00

65 Kujanga Drainage -do- Santara

D/C Imp. to Balia D/C check dam 2 20 50.00 50.00 0.00 0.00 0.00 0.00

66 Kujanga Drainage -do- Mahanga

D/C

Imp. to Udayachandapur

D/C check dam 1 10 15.00 0.00 15.00 0.00 0.00 0.00

67 Kujanga Drainage -do- Mahanga

D/C Imp. to

Gadakujanga D/C check dam 1 10 10.00 0.00 0.00 10.00 0.00 0.00

68 Erasama Drainage -do- Mahanga

D/C

Imp. to Mahanga nallah and its

system check dam 27 270 500.00 200.00 200.00 100.00 0.00 0.00

69 Erasama Drainage -do- Alaka D/C

Imp. to link drains & Sub-drains of

Sankha and Kamalapaka D/S

check dam 6 60 140.00 0.00 0.00 0.00 140.00 0.00

70 Erasama Drainage -do- Hansua

D/C

Imp. to 10 nos. of drains in Erasama block in Doab No-

1

check dam 11 110 200.00 0.00 0.00 0.00 0.00 200.00

71 Erasama Drainage -do- Mahanga

D/C Imp. to Kanaguli

Khurant D/C check dam 1 10 15.00 15.00 0.00 0.00 0.00 0.00

72 Erasama Drainage -do- Adhanga

D/C Imp. to Tanra

Pokhariapada D/C check dam 2 20 30.00 0.00 30.00 0.00 0.00 0.00

73 Erasama Drainage -do- Tigiria

D/C Imp. to Telegunia

D/C check dam 2 20 40.00 0.00 0.00 40.00 0.00 0.00

74 Erasama Drainage -do- Brudha

D/C Imp. to Kantapada

Sundarkani D/C check dam 3 30 65.00 0.00 0.00 0.00 65.00 0.00

District Irrigation Plan (DIP), Jagatsinghpur Page 89

75 Erasama Drainage -do- Tigiria

D/C Imp. to

Gunthiapata D/C check dam 1 10 10.00 0.00 0.00 0.00 0.00 10.00

76 Erasama Drainage -do- Tigiria

D/C Imp. to Kiada D/C check dam 1 10 10.00 0.00 0.00 0.00 0.00 10.00

77 Erasama Drainage -do- Hansua

D/C Imp. to Barakolia

D/C check dam 1 10 10.00 0.00 0.00 0.00 10.00 0.00

78 Erasama Drainage -do- Tigiria

D/C Imp. to Sunadiha

D/C check dam 1 10 10.00 0.00 0.00 0.00 10.00 0.00

79 Erasama Drainage -do- Hansua

D/C Imp. to Hansua

D/C check dam 13 130 225.00 0.00 0.00 125.00 100.00 0.00

80 Erasama Drainage -do- Mahanga

D/C Imp. to Kuranta to

Balitutha D/C check dam 2 20 40.00 0.00 40.00 0.00 0.00 0.00

81 Erasama Drainage -do- Brudha

D/C Imp. to Basulei

nala check dam 3 30 60.00 0.00 60.00 0.00 0.00 0.00

82 Erasama Drainage -do- Brudha

D/C Imp. to Tigiria

nala check dam 3 30 60.00 0.00 60.00 0.00 0.00 0.00

83 Erasama Drainage -do- Adhanga

D/C Imp. to Nuapada

nala check dam 1 10 15.00 15.00 0.00 0.00 0.00 0.00

84 Erasama Drainage -do- Brudha

D/C Imp. to Brudha

D/C check dam 9 90 225.00 225.00 0.00 0.00 0.00 0.00

Total

Drainage Check Dam 249 2490 30 4487 1470 930 935 765 387

1 Jagatsinghpur

State Irrigation Departme

nt ( Cad Div.)

Har khet Ko

pani

Line Field

Channels

Mahanadi Delta Stage I

Construction of Field

Channels (MDS-I)

1 3248 5 1624.26 600 424 300 300.26 0

2 Raghunathpur

-do- -do- Mahanadi Delta

Stage I -do- 1 2788 4 1394.25 600 300 200 0 294.25

3 Balikuda -do- -do- -do- Mahanadi Delta

Stage I -do- 1 5180 5 2590.17 700 550 440 500 400.17

4 Biridi -do- -do- -do- Mahanadi Delta

Stage I

Construction of Field

Channels (MDS-I)

1 2837 5 1418.67 400 400 300 200 118.67

District Irrigation Plan (DIP), Jagatsinghpur Page 90

5 Naugaon -do- -do- -do- Mahanadi Delta

Stage I

Construction of Field

Channels (MDS-I)

1 1683 4 841.5 300 200 200 0 141.5

6 Tirtol -do- -do- -do- Mahanadi Delta

Stage I

Construction of Field

Channels (MDS-I)

1 1800 5 900.24 200 200 200 150 150.24

7 Kujanga -do- -do- -do- Mahanadi Delta

Stage I

Construction of Field

Channels (MDS-I)

1 207 2 103.95 50 53.95 0 0 0

8 Erasama -do- -do- -do- Mahanadi Delta

Stage I

Construction of Field

Channels (MDS-I)

1 1046 5 523.05 200 100 100 73.05 50

State Irrigation

Department ( Cad Div.) Line Field Channels

8 18789 35 9396.0

9 3050 2227.95 1740 1223.31

1154.83

1 Jagatsinghpur State

Irrigation

Department ( Cad Div.)

Har khet Ko

pani

Unlined Channels

Mahanadi Delta Stage I

Construction of Field

Channels (MDS-I)

1 197 1 98.44 98.44 0 0 0 0

2 Raghunathpur

-do- -do- -do- 1 169 1 84.5 84.5 0 0 0 0

3 Balikuda -do- -do- -do- -do- 1 314 3 156.98 0 0 50 50 56.98

4 Biridi -do- -do- -do- -do- 1 172 2 85.98 0 50 35.98 0 0

5 Naugaon -do- -do- -do- -do- -do- 1 102 2 51 0 0 25 26 0

6 Tirtol -do- -do- -do- -do- -do- 1 109 2 54.56 0 0 0 34.56 20

7 Kujanga -do- -do- -do- -do- -do- 1 13 1 6.3 6.3 0 0 0 0

8 Erasama -do- -do- -do- -do- -do- 1 63 2 31.7 16.7 15 0 0 0

State Irrigation

Department ( Cad Div.) Unlined

Channels 8 1139 14 569.46 205.94 65 110.98 110.56 76.98

Total ( Cad Div.) 16 19928 49 9965.55 3255.94 2292.95 1850.98 1333.87 1231.81

District Irrigation Plan (DIP), Jagatsinghpur Page 91

1 Jagatsinghpur

Lift Irrigation

Har khet Ko

pani

Lift Irrigation

LIP 50 nos of LIP 50 500 5 750 150 150 150 150 150

2 Raghunathpur

Lift Irrigation

Lift Irrigation

LIP 35 nos of LIP 35 350 5 525 105 105 105 105 105

3 Balikuda

Lift Irrigation

Lift Irrigation

LIP 50 nos of LIP 50 500 5 750 150 150 150 150 150

4 Biridi

Lift Irrigation

Lift Irrigation

LIP 65 nos of LIP 65 650 5 975 195 195 195 195 195

5 Naugaon

Lift Irrigation

Lift Irrigation

LIP 50 nos of LIP 50 500 5 750 150 150 150 150 150

6 Tirtol

Lift Irrigation

Lift Irrigation

LIP 60 nos of LIP 60 600 5 900 180 180 180 180 180

7 Kujanga

Lift Irrigation

Lift Irrigation

LIP 30 nos of LIP 30 300 5 450 90 90 90 90 90

8 Earasama

Lift Irrigation

Lift Irrigation

LIP 50 nos of LIP 50 500 5 750 150 150 150 150 150

Total Lift Irrigation 390 3900 5850 1170 1170 1170 1170 1170

Total HKK

P RRR 160 8472

20767.2

5344.94 5226.73 4170.9

9 3620.22 2404.3

Total HKK

P Check Dam 249 2490 4487 1470 930 935 765 387

Total HKK

P

Line Field Channels

8 18789 9396.0

9 3050 2227.95 1740 1223.31 1154.8

Total HKK

P

Unlined Channels

8 1139 569.46 205.94 65 110.98 110.56 76.98

Total HKK

P Lift Irrigation 390 3900 5850 1170 1170 1170 1170 1170

G.T HKK

P all 815 34790

41069.7

11240.88

9619.68 8126.9

7 6889.09 5193.1

District Irrigation Plan (DIP), Jagatsinghpur Page 92

1 Jagatsinghpur

Horticulture

Per drop mor

e crop (Mic

ro Irrigation)

Non -DPAP Drip

Drip Irrigation System ( Wide Spaced Crop

1 95 5 45.345 9.069 9.069 9.069 9.069 9.069

2 Jagatsinghpur

Horticulture

-do-

Drip Irrigation System (

ClosedSpaced Crop

1 137 5 129.408 25.8816 25.8816 25.8816 25.8816 25.8816

3 Raghunathpur

Horticulture

-do- Drip Irrigation System ( Wide Spaced Crop

1 47.5 5 22.6725 4.5345 4.5345 4.5345 4.5345 4.5345

4 Raghunathpur

Horticulture

-do-

Drip Irrigation System (

ClosedSpaced Crop

1 68.5 5 64.704 12.9408 12.9408 12.9408 12.9408 12.9408

5 Balikuda Horticulture

-do- Drip Irrigation System ( Wide Spaced Crop

1 71.25 5 34 6.8 6.8 6.8 6.8 6.8

6 Balikuda Horticulture

-do- -do-

Drip Irrigation System (

ClosedSpaced Crop

1 102.75 5 97.056 19.4112 19.4112 19.4112 19.4112 19.4112

7 Biridi Horticulture

-do- -do- Drip Irrigation System ( Wide Spaced Crop

1 47.5 5 22.67 4.534 4.534 4.534 4.534 4.534

8 Biridi Horticulture

-do- -do-

Drip Irrigation System (

ClosedSpaced Crop

1 68.5 5 64.704 12.9408 12.9408 12.9408 12.9408 12.9408

9 Naugaon Horticulture

-do- -do- Drip Irrigation System ( Wide Spaced Crop

1 38 5 18.138 3.6276 3.6276 3.6276 3.6276 3.6276

10 Naugaon Horticulture

-do- -do-

Drip Irrigation System (

ClosedSpaced Crop

1 54.8 5 51.763 10.3526 10.3526 10.3526 10.3526 10.3526

11 Tirtol Horticulture

-do- -do- Drip Irrigation System ( Wide Spaced Crop

1 71.25 5 34 6.8 6.8 6.8 6.8 6.8

District Irrigation Plan (DIP), Jagatsinghpur Page 93

12 Tirtol Horticulture

-do- -do-

Drip Irrigation System (

ClosedSpaced Crop

1 102.75 5 97.056 19.4112 19.4112 19.4112 19.4112 19.4112

13 Kujanga Horticulture

-do- -do- Drip Irrigation System ( Wide Spaced Crop

1 71.25 5 34 6.8 6.8 6.8 6.8 6.8

14 Kujanaga Horticulture

-do- -do-

Drip Irrigation System (

ClosedSpaced Crop

1 102.75 5 97.056 19.4112 19.4112 19.4112 19.4112 19.4112

15 Erasama Horticulture

-do- -do- Drip Irrigation System ( Wide Spaced Crop

1 33.25 5 15.87 3.174 3.174 3.174 3.174 3.174

16 Erasama Horticulture

-do- -do-

Drip Irrigation System (

ClosedSpaced Crop

1 47.95 5 45.292 9.0584 9.0584 9.0584 9.0584 9.0584

Total Horticulture 16 1160 873.73

45 174.746

9 174.747

174.747

174.747 174.75

1 Jagatsinghpur

Horticulture Per

drop mor

e crop (Mic

ro Irrigation)

Non -DPAP

Sprinkler

Micro Spinkler Irrigatin System

1 2 5 1.178 0.2356 0.2356 0.2356 0.2356 0.2356

2 Jagatsinghpur

Horticulture

-do- Portable Spinkler Irrigation System

1 120 5 23.52 4.704 4.704 4.704 4.704 4.704

3 Raghunathpur

Horticulture

-do- Micro Spinkler

Irrigatin System 1 1 5 0.589 0.1178 0.1178 0.1178 0.1178 0.1178

4 Raghunathpur

Horticulture

-do- Portable Spinkler Irrigation System

1 60 5 11.76 2.352 2.352 2.352 2.352 2.352

5 Balikuda Horticulture

-do- Micro Spinkler

Irrigatin System 1 1.5 5 0.8335 0.1667 0.1667 0.1667 0.1667 0.1667

District Irrigation Plan (DIP), Jagatsinghpur Page 94

6 Balikuda Horticulture

-do- Portable Spinkler Irrigation System

1 90 5 17.64 3.528 3.528 3.528 3.528 3.528

7 Biridi Horticulture

-do- -do- Micro Spinkler

Irrigatin System 1 1 5 0.589 0.1178 0.1178 0.1178 0.1178 0.1178

8 Biridi Horticulture

-do- -do- Portable Spinkler Irrigation System

1 60 5 11.76 2.352 2.352 2.352 2.352 2.352

9 Naugaon Horticulture

-do- -do- Micro Spinkler

Irrigatin System 1 0.8 5 0.4712 0.09424 0.09424 0.09424 0.09424 0.09424

10 Naugaon Horticulture

-do- -do- Portable Spinkler Irrigation System

1 48 5 9.408 1.8816 1.8816 1.8816 1.8816 1.8816

11 Tirtol Horticulture

-do- -do- Micro Spinkler

Irrigatin System 1 1.5 5 0.8835 0.1767 0.1767 0.1767 0.1767 0.1767

12 Tirtol Horticulture

-do- -do- Portable Spinkler Irrigation System

1 90 5 17.64 3.528 3.528 3.528 3.528 3.528

13 Kujanga Horticulture

-do- -do- Micro Spinkler

Irrigatin System 1 1.5 5 0.8835 0.1767 0.1767 0.1767 0.1767 0.1767

14 Kujanga Horticulture

-do- -do- Portable Spinkler Irrigation System

1 90 5 17.64 3.528 3.528 3.528 3.528 3.528

15 Erasama Horticulture

-do- -do- Micro Spinkler

Irrigatin System 1 0.7 5 0.4123 0.08246 0.08246 0.08246 0.08246 0.08246

16 Erasama Horticulture

-do- -do- Portable Spinkler Irrigation System

1 42 5 8.232 1.6464 1.6464 1.6464 1.6464 1.6464

Total Horticulture 16 610 123.44 24.688 24.688 24.688 24.688 24.688

District Irrigation Plan (DIP), Jagatsinghpur Page 95

1 Jagatsinghpur

Fishery

Per dro

p mor

e crop

Farm Pond

Farm Pond

New Construction of Farm

Pond

100 100 5 109.5 21.9 21.9 21.9 21.9 21.9

2 Raghunathpur

Fishery

Farm Pond

New Construction of Farm

Pond

100 100 5 109.5 21.9 21.9 21.9 21.9 21.9

3 Balikuda Fishery

Farm Pond

New Construction of Farm

Pond

100 100 5 109.5 21.9 21.9 21.9 21.9 21.9

4 Biridi Fishery

Farm Pond

New Construction of Farm

Pond

100 100 5 109.5 21.9 21.9 21.9 21.9 21.9

5 Naugaon Fishery

Farm Pond

New Construction of Farm

Pond

100 100 5 109.5 21.9 21.9 21.9 21.9 21.9

6 Tirtol Fishery

Farm Pond

New Construction of Farm

Pond

100 100 5 109.5 21.9 21.9 21.9 21.9 21.9

7 Kujanga Fishery

Farm Pond

New Construction of Farm

Pond

100 100 5 109.5 21.9 21.9 21.9 21.9 21.9

8 Erasama Fishery

Farm Pond

New Construction of Farm

Pond

100 100 5 109.5 21.9 21.9 21.9 21.9 21.9

9 Jagatsinghpur

Fishery

Pond Renovation 100 100 5 60 12 12 12 12 12

10 Raghunathpur

Fishery

Pond Renovation 100 100 5 60 12 12 12 12 12

11 Balikuda Fishery

Pond Renovation 100 100 5 60 12 12 12 12 12

District Irrigation Plan (DIP), Jagatsinghpur Page 96

12 Biridi Fishery

Pond Renovation 100 100 5 60 12 12 12 12 12

13 Naugaon Fishery

Pond Renovation 100 100 5 60 12 12 12 12 12

14 Tirtol Fishery

Pond Renovation 100 100 5 60 12 12 12 12 12

15 Kujanga Fishery

Pond Renovation 100 100 5 60 12 12 12 12 12

16 Erasama Fishery

Pond Renovation 100 100 5 60 12 12 12 12 12

Total Fishery 1600 1600 80 1356 271.2 271.2 271.2 271.2 271.2

1 Jagatsinghpur

Agriculture

Per dro

p mor

e crop

Water Lifting

Devices

Surface Lift from Pernial Source

150 150 5 150 30 30 30 30 30

2 Raghunathpur

-do- -do- -do-

150 150 5 150 30 30 30 30 30

3 Balikuda -do- -do- -do-

150 150 5 180 36 36 36 36 36

4 Biridi -do- -do- -do-

150 150 5 150 30 30 30 30 30

5 Naugaon -do- -do- -do-

150 150 5 150 30 30 30 30 30

6 Tirtol -do- -do- -do-

150 150 5 150 30 30 30 30 30

7 Kujanga -do- -do- -do-

150 150 5 150 30 30 30 30 30

8 Erasama -do- -do- -do-

150 150 5 240 48 48 48 48 48

Total Agriculture 1200 1200 1320 264 264 264 264 264

District Irrigation Plan (DIP), Jagatsinghpur Page 97

Total

PDM

C

Non -DPAP Drip

16 1160 873.73

45 174.746

9 174.747

174.747

174.747 174.75

PDM

C

Non -DPAP Sprinkler

16 610 123.44 24.688 24.688 24.688 24.688 24.688

PDM

C Farm Pond 1600 1600 1356 271.2 271.2 271.2 271.2 271.2

PDM

C

Water Lifting Devices

1200 1200 1320 264 264 264 264 264

Total

PDM

C all 2832 4570

3673.175

734.6349

734.635 734.63

5 734.635 734.63

1 Jagatsinghpur

Agril. Department ( Soil Conv..

)

PMKSY

Watershe

d

(RRR)Panchakani

a G.P Tank

Renovation Renovation 1 0 1 5 5 0 0 0 0

2 Jagatsinghpur

-do- -do-

(RRR) Ranga Patana Tank

Renovation Renovation 1 0 1 5 0 5 0 0 0

3 Jagatsinghpur

-do- -do- (RRR)

Gobara Tank

Renovation Renovation 1 0 1 10 0 0 0 10 0

4 Jagatsinghpur

-do- -do- (RRR)

Lingaswar Tank

Renovation Renovation 1 0 1 10 10 0 0 0 0

5 Jagatsinghpur

-do- -do- (RRR)Balapkhari

Renovation Renovation 1 0 1 10 10 0 0 0 0

6 Raghunathpur

-do- -do- (RRR) Jena

Pokhari Renovation Renovation 1 0 1 5 0 5 0 0 0

7 Balikuda -do- -do- (RRR)

G.P Tank Renovation Renovation 1 0 1 10 10 0 0 0 0

District Irrigation Plan (DIP), Jagatsinghpur Page 98

8 Naugaon -do- -do-

(RRR) Nuapokh

ari Community Tank

Renovation Renovation 1 0 1 5 5 0 0 0 0

9 Naugaon -do- -do- (RRR)Govt Tank, Bhatana

Renovation Renovation 1 0 1 10 0 10 0 0 0

10 Naugaon -do- -do-

(RRR) Tubi

Pokhari, Bhatapa

da

Renovation Renovation 1 0 1 5 5 0 0 0 0

11 Naugaon -do- -do-

(RRR) Sunthalo

West Side Tank

Renovation Renovation 1 0 1 5 0 0 5 0 0

12 Naugaon -do- -do-

(RRR) Badhi Sahi

Communiity Tank

Renovation Renovation 1 0 1 5 0 0 0 0 5

13 Erasama -do- -do- (RRR) Tank

Renovation Renovation 1 0 1 20 10 0 10 0 0

14 Jagatsinghpur

-do- -do- Farm Pond

6 nos of Farm Pond 6 nos of

Farm Pond 6 2.4 5 6 2 1 1 1 1

15 Raghunathpur

-do- -do- -do- 4 nos 4 nos 4 1.6 5 4 1 1 1 1 0

16 Biridi -do- -do- -do- 8 Nos 8 Nos 8 3.2 4 8 2 2 2 2 0

17 Tirtol -do- -do- -do- 4 nos 4 nos 4 1.6 4 4 1 1 1 1 0

18 Kujanaga -do- -do- -do- 6 nos of Farm Pond 6 nos of

Farm Pond 6 2.4 5 6 2 1 1 1 1

19 Erasama -do- -do- -do- 9 Nos 9 Nos 9 3.6 5 9 2 2 2 2 1

District Irrigation Plan (DIP), Jagatsinghpur Page 99

20 Balikuda -do- -do- Community Tank Community

Tank 1 2 2 20 0 0 0 10 10

21 Balikuda -do- -do- Community Tank Community

Tank 1 2 1 10 10 0 0 0 0

22 Raghunathpur

-do- -do- Gully Control Gully Control 1 0 1 4 4 0 0 0 0

23 Balikuda -do- -do- Jora Diversion Weir Cum

Sluice Gate

Diversion Weir Cum Sluice Gate

1 0 1 20 0 20 0 0 0

24 Balikuda -do- -do- Jora Diversion Weir Cum

Sluice Gate

Diversion Weir Cum Sluice Gate

1 0 1 15 0 0 15 0 0

25 Balikuda -do- -do- Runoff Managed

Structure

Runoff Managed Structure

1 0 1 25 25 0 0 0 0

26 Balikuda -do- -do- Runoff Managed

Structure

Runoff Managed Structure

1 0 1 10 0 0 10 0 0

27 Naugaon -do- -do- Arioda Ghari

Bandha

Runoff Managed Structure

Runoff Managed Structure

1 0 1 10 0 0 0 0 10

28 Naugaon -do- -do-

Sikhar Dihakul

to Baisima

nia Gheri Bandh

Runoff Managed Structure

Runoff Managed Structure

1 0 2 15 10 5 0 0 0

29 Naugaon -do- -do- Drainage Clearance

Erada

Drainage Clearance

Erada 1 0 1 5 0 0 0 5 0

Total RRR 60 18.8 53 276 114 53 48 33 28

1 Jagatsinghpur

Agril. Department ( Soil Conv..

)

PMKSY

Watershe

d

Gharibandha

Check Dam Check Dam 1 10 1 4 4 0 0 0 0

District Irrigation Plan (DIP), Jagatsinghpur Page 100

2 Jagatsinghpur

-do- -do- Ghariban

dha Check Dam Check Dam 1 10 1 4 4 0 0 0 0

3 Jagatsinghpur

-do- -do- Ghariban

dha Check Dam Check Dam 1 10 1 5 0 0 5 0 0

4 Jagatsinghpur

-do- -do- Check Dam Check Dam 1 10 1 4 0 0 0 4 0

5 Balikuda -do- -do- Nagapur

Jori Check Dam Check Dam 1 10 1 22 22 0 0 0 0

6 Balikuda -do- -do- Check Dam Check Dam 1 10 2 4 2 2 0 0 0

7 Naugaon -do- -do- Bhatana

Nala Check Dam Check Dam 1 10 1 10 10 0 0 0 0

8 Naugaon -do- -do- Gobari

Nala Check Dam Check Dam 1 10 1 10 0 10 0 0 0

9 Naugaon -do- -do-

Naugaon Jora

Ganda to Alana Nala

Check Dam Check Dam 1 10 1 10 0 0 10 0 0

10 Naugaon -do- -do- Bhaba Chandi

Jora Check Dam Check Dam 1 10 1 5 0 0 0 5 0

11 Naugaon -do- -do- Check Dam Check Dam 1 10 1 5 0 0 5 0 0

12 Kujanaga -do- -do- Potnai Check Dam Check Dam 1 10 1 5 5 0 0 0 0

13 Erasama -do- -do- Dhalipon

ga Check Dam Check Dam 1 10 1 5 5 0 0 0 0

14 Erasama -do- -do- Check Dam Check Dam 1 10 1 5 0 5 0 0 0

Total Check Dam 14 140 15 98 52 17 20 9 0

Total Watershed

RRR 60 18.8 53 276 114 53 48 33 28

Total Watershed

Check Dam 14 140 15 98 52 17 20 9 0

District Irrigation Plan (DIP), Jagatsinghpur Page 101

Total Watershed

all 74 158.8 68 374 166 70 68 42 28

1 Jagatsinghpur

State Irrigation Department ( Irr.

Dvn. Jspur.)

State

Plan

(RRR) Major

Irrigation/

Machhagaon Canal

Renovation of Disty No.10

Renovation, Linning,

Earth work & Concrete

work

1 184 5 100.00 20.00 20.00 20.00 20.00 20.00

2 Jagatsinghpur

-do- -do- -do- Renovation of Disty. No 10-F

Renovation, Linning,

Earth work & Concrete

work

1 55 3 30.00 0.00 10.00 10.00 10.00 0.00

3 Jagatsinghpur

-do- -do- -do- Renovation of

Disty. No 10-FA -do- 1 55 3 30.00 10.00 10.00 10.00 0.00 0.00

4 Jagatsinghpur

-do- -do- -do- Renovation of

Lahanga Minor

Earth work & Concrete

work 1 37 2 20.00 10.00 10.00 0.00 0.00 0.00

5 Jagatsinghpur

-do- -do- -do- Renovation of

Disty. No 10-BA

Renovation, Linning &

R/S & Renovation of outlets &

Drainage syphon

1 55 2 30.00 20.00 10.00 0.00 0.00 0.00

6 Jagatsinghpur

-do- -do- -do- Renovation of

Disty. No 19 & its system

Concrete 1 184 4 100.00 25.00 25.00 25.00 0.00 25.00

7 Jagatsinghpur

-do- -do- -do- Renovation of Disty. No 19 B

Earth work & Concrete

work 1 74 4 40.00 10.00 10.00 10.00 10.00 0.00

District Irrigation Plan (DIP), Jagatsinghpur Page 102

8 Jagatsinghpur

-do- -do- -do- Renovation of

Sagadhua minor

Renovation, Linning,

Earth work & Concrete

work

1 74 4 40.00 10.00 10.00 10.00 0.00 10.00

9 Jagatsinghpur

-do- -do- -do- Renovation of Kendal Minor

Earth work & Concrete

work 1 74 5 40.00 8.00 8.00 8.00 8.00 8.00

10 Jagatsinghpur

-do- -do- -do- Renovation of

Jahanpur Minor

Renovation, Linning,

Earth work & Concrete

work

1 75 4 41.00 11.00 10.00 10.00 10.00 0.00

11 Jagatsinghpur

-do- -do- -do- Renovation of Disty. No 19-D

Renovation, Linning,

Earth work & Concrete

work

1 92 5 50.00 10.00 10.00 10.00 10.00 10.00

12 Jagatsinghpur

-do- -do- -do- Renovation Disty.

Noof 19-E

Renovation, Linning,

Earth work & Concrete

work

1 92 5 50.00 10.00 10.00 10.00 10.00 10.00

13 Raghunathpur

-do- -do- -do- Renovation of 7 &

its system

Earth work & Concrete

work 1 184 5 100.00 20.00 20.00 20.00 20.00 20.00

14 Raghunathpur

-do- -do- -do- Renovation of

Disty No.8 & its system

Earth work & Concrete

work 1 147 5 80.00 15.00 15.00 15.00 15.00 20.00

15 Raghunathpur

-do- -do- -do- Renovation of

Disty No.9 & its system

Earth work & Concrete

work 1 166 5 90.00 15.00 15.00 15.00 15.00 30.00

16 Raghunathpur

-do- -do- -do-

Renovation of Ichhapur Minor,

Ala minor , Murunia Minor,

Puja Minor

Earth work & Concrete

work 1 114 5 62.00 10.00 10.00 15.00 15.00 12.00

District Irrigation Plan (DIP), Jagatsinghpur Page 103

17 Raghunathpur

-do- -do- -do-

Renovation of Radhanga Minor,

Radhanga Extension, Jira

Minor

Renovation, Linning,

Earth work & Concrete

work

1 92 5 50.00 10.00 10.00 10.00 10.00 10.00

18 Balikuda -do- -do- -do- Renovation of Disty. No 13-C

Renovation, Linning,

Earth work & Concrete

work

1 74 3 40.00 15.00 15.00 10.00 0.00 0.00

19 Balikuda -do- -do- -do- Renovation of

Disty No.13

Renovation, Linning,

Earth work & Concrete

work

1 74 3 40.00 15.00 15.00 10.00 0.00 0.00

20 Balikuda -do- -do- -do- Renovation of Disty. No 13-D

Renovation, Linning,

Earth work & Concrete

work

1 74 3 40.00 15.00 15.00 10.00 0.00 0.00

21 Balikuda -do- -do- -do- Renovation of Disty. No 13-E

Renovation, Linning,

Earth work & Concrete

work

1 55 5 30.00 6.00 6.00 6.00 6.00 6.00

22 Balikuda -do- -do- -do- Renovation of

Disty No.15

Renovation, Linning,

Earth work & Concrete

work

1 92 3 50.00 15.00 15.00 20.00 0.00 0.00

23 Balikuda -do- -do- -do- Renovation of Disty. No 15-A

Renovation, linning of

canal & C.C. guard wall

1 110 5 60.00 12.00 12.00 12.00 12.00 12.00

24 Balikuda -do- -do- -do- Renovation of Disty. No 13-B

Renovation, Linning,

Earth work & Concrete

work

1 110 5 60.00 12.00 12.00 12.00 12.00 12.00

District Irrigation Plan (DIP), Jagatsinghpur Page 104

25 Balikuda -do- -do- -do- Renovation of

Disty. no 14

Renovation, Structure

work 1 92 3 50.00 15.00 15.00 20.00 0.00 0.00

26 Balikuda -do- -do- -do- Renovation of Titira Minor

Earth work & Concrete

work 1 55 5 30.00 6.00 6.00 6.00 6.00 6.00

27 Balikuda -do- -do- -do- Renovation of

Disty. No 15-A1

Renovation, Linning,

Earth work & Concrete

work

1 55 3 30.00 12.00 9.00 9.00 0.00 0.00

28 Balikuda -do- -do- -do- Renovation of Disty. No 16-B

Renovation, Linning,

Earth work & Concrete

work

1 92 5 50.00 10.00 10.00 10.00 10.00 10.00

29 Balikuda -do- -do- -do- Renovation of Disty No.15-C

Renovation, Linning,

Earth work & Concrete

work

1 110 5 60.00 12.00 12.00 12.00 12.00 12.00

30 Balikuda -do- -do- -do- Renovation of Disty. No 13-F

Renovation, Linning,

Earth work & Concrete

work

1 74 5 40.00 8.00 8.00 8.00 8.00 8.00

31 Balikuda -do- -do- -do- Renovation of

Sadeipur Minor

Renovation, Linning,

Earth work & Concrete

work

1 74 3 40.00 0.00 15.00 15.00 10.00 0.00

32 Balikuda -do- -do- -do- Renovation of Benupur Sub-

minor

Renovation, Linning,

Earth work & Concrete

work

1 46 5 25.00 5.00 5.00 5.00 5.00 5.00

District Irrigation Plan (DIP), Jagatsinghpur Page 105

33 Balikuda -do- -do- -do- Renovation of Dalana Minor

Renovation, Linning,

Earth work & Concrete

work

1 92 5 50.00 10.00 10.00 10.00 10.00 10.00

34 Balikuda -do- -do- -do- Renovation of

Debahata Minor

Earth work & Concrete

work 1 55 5 30.00 6.00 6.00 6.00 6.00 6.00

35 Balikuda -do- -do- -do- Renovation of Dadara Minor

Earth work & Concrete

work 1 55 5 30.00 6.00 6.00 6.00 6.00 6.00

36 Balikuda -do- -do- -do- Renovation of Kharamanga

Minor

Earth work & Concrete

work 1 37 3 20.00 6.00 6.00 8.00 0.00 0.00

37 Balikuda -do- -do- -do- Renovation of

Mulugaon minor

Earth work & Concrete

work 1 55 5 30.00 6.00 6.00 6.00 6.00 6.00

38 Balikuda -do- -do- -do- Renovation of Digoda Minor

Renovation, Linning,

Earth work & Concrete

work

1 64 5 35.00 6.00 6.00 6.00 6.00 11.00

39 Balikuda -do- -do- -do- Renovation of

Kania Sub minor

Renovation, Linning,

Earth work & Concrete

work

1 55 5 30.00 6.00 6.00 6.00 6.00 6.00

40 Balikuda -do- -do- -do- Renovation of

Alavar Sub minor

Renovation, Linning,

Earth work & Concrete

work

1 18 1 10.00 10.00 0.00 0.00 0.00 0.00

41 Balikuda -do- -do- -do- Renovation of Iswarpur Sub

minor

Renovation, , Earth work &

Concrete work

1 18 1 10.00 10.00 0.00 0.00 0.00 0.00

District Irrigation Plan (DIP), Jagatsinghpur Page 106

42 Balikuda -do- -do- -do- Renovation of Mathasahi sub

minor

Renovation, , Earth work &

Concrete work

1 37 2 20.00 10.00 10.00 0.00 0.00 0.00

43 Balikuda -do- -do- -do- Renovation of Ghodadihasub

minor

Renovation, , Earth work &

Concrete work

1 18 1 10.00 10.00 0.00 0.00 0.00 0.00

44 Balikuda -do- -do- -do- Renovation of

Basantasub minor

Renovation, , Earth work &

Concrete work

1 18 1 10.00 0.00 10.00 0.00 0.00 0.00

45 Balikuda -do- -do- -do- Renovation of

Mandakeswarsub minor

Renovation, , Earth work &

Concrete work

1 18 1 10.00 0.00 10.00 0.00 0.00 0.00

46 Balikuda -do- -do- -do- Renovation of Mathasahi sub

minor

Renovation, , Earth work &

Concrete work

1 18 1 10.00 10.00 0.00 0.00 0.00 0.00

47 Balikuda -do- -do- -do- Renovation of

Ramtol sub minor

Renovation, , Earth work &

Concrete work

1 18 1 10.00 10.00 0.00 0.00 0.00 0.00

48 Balikuda -do- -do- -do- Renovation of Dua

Sub minor

-do-

1 18 1 10.00 10.00 0.00 0.00 0.00 0.00

49 Balikuda -do- -do- -do- Renovation of

badaradanga Sub minor

Renovation, Linning,

Earth work & Concrete

work

1 44 4 24.00 0.00 6.00 6.00 6.00 6.00

District Irrigation Plan (DIP), Jagatsinghpur Page 107

50 Balikuda -do- -do- -do- Renovation of Minjapada Sub

Minor

Renovation, Linning,

Earth work & Concrete

work

1 57 5 31.00 6.00 6.00 6.00 6.00 7.00

51 Biridi -do- -do- -do- Renovation of

Bagalpur Disty.

Renovation, linning,

Earth work & Concrete

work

1 221 5 120.00 20.00 25.00 25.00 25.00 25.00

52 Biridi -do- -do- -do- Renovation of Bombilo Disty.

Renovation, linning,

Earth work & Concrete

work

1 147 5 80.00 10.00 10.00 20.00 20.00 20.00

53 Biridi -do- -do- -do- Renovation of Disty No.5 B

Renovation, linning,

Earth work & Concrete

work

1 147 5 80.00 10.00 10.00 10.00 20.00 30.00

54 Biridi -do- -do- -do- Renovation of Chasikhanda

Minor

Renovation, linning,

Earth work & Concrete

work

1 110 5 60.00 10.00 10.00 10.00 20.00 10.00

55 Biridi -do- -do- -do- Renovation of

Khandatira Sub minor

Renovation, linning,

Earth work & Concrete

work

1 81 5 44.00 10.00 10.00 10.00 10.00 4.00

56 Biridi -do- -do- -do- Renovation

ofDisty No.4A

Renovation, linning,

Earth work & Concrete

work

1 110 5 60.00 10.00 10.00 20.00 10.00 10.00

District Irrigation Plan (DIP), Jagatsinghpur Page 108

57 Biridi -do- -do- -do- Renovation of Bagula Minor

Renovation, Linning &

R/S & Renovation of outlets &

Drainage syphon

1 110 5 60.00 10.00 10.00 10.00 10.00 20.00

58 Naugaon -do- -do- -do- Renovation of Disty No.19 A2

Renovation, Linning,

Earth work & Concrete

work

1 24 1 13.00 13.00 0.00 0.00 0.00 0.00

59 Naugaon -do- -do- -do- Renovation of

Disty No.16

Renovation, Earth work & Concrete

work

1 24 1 13.00 13.00 0.00 0.00 0.00 0.00

60 Naugaon -do- -do- -do- Renovation of

Dgajarajpur Minor

Renovation, Earth work & Concrete

work

1 9 1 5.00 0.00 0.00 5.00 0.00 0.00

61 Naugaon -do- -do- -do- Renovation of Bajapur Sub

minor

Renovation, Earth work & Concrete

work

1 9 1 5.00 0.00 0.00 0.00 5.00 0.00

62 Naugaon -do- -do- -do- Renovation of Mundala Sub

minor

Renovation, Earth work & Concrete

work

1 9 1 5.00 0.00 0.00 0.00 0.00 5.00

63 Naugaon -do- -do- -do- Renovation of

Kumari Sub minor

Renovation, Earth work & Concrete

work

1 9 1 5.00 0.00 5.00 0.00 0.00 0.00

64 Naugaon -do- -do- -do- Renovation of

kundeswar S/M

Renovation, Earth work & Concrete

work

1 9 1 5.00 5.00 0.00 0.00 0.00 0.00

District Irrigation Plan (DIP), Jagatsinghpur Page 109

65 Naugaon -do- -do- -do- Renovation of

Bhoda S/M

Renovation, Earth work & Concrete

work

1 9 1 5.00 5.00 0.00 0.00 0.00 0.00

66 Naugaon -do- -do- -do- Renovation of

nandigram Sub minor

Renovation, Earth work & Concrete

work

1 9 1 5.00 5.00 0.00 0.00 0.00 0.00

67 Naugaon -do- -do- -do- Renovation of sansailo Sub

minor

Renovation, Earth work & Concrete

work

1 9 1 5.00 5.00 0.00 0.00 0.00 0.00

68 Naugaon -do- -do- -do- Renovation of Rohia Minor

Renovation, Earth work & Concrete

work

1 9 1 5.00 5.00 0.00 0.00 0.00 0.00

69 Naugaon -do- -do- -do- Renovation of Chakuli Minor

Renovation, Earth work & Concrete

work

1 18 1 10.00 10.00 0.00 0.00 0.00 0.00

70 Naugaon -do- -do- -do- Renovation of Disty no. 16-A

Renovation, Linning,

Earth work & Concrete

work

1 18 2 10.00 5.00 5.00 0.00 0.00 0.00

71 Naugaon -do- -do- -do- Renovation of Disty. No 16-B

Renovation, Linning,

Earth work & Concrete

work

1 18 1 10.00 0.00 10.00 0.00 0.00 0.00

72 Naugaon -do- -do- -do- Renovation of

Disty. No 19-A2

Renovation, Linning,

Earth work & Concrete

work

1 9 1 5.00 5.00 0.00 0.00 0.00 0.00

73 Naugaon -do- -do- -do- Renovation of Chadheigaon

Minor

-do-

1 9 1 5.00 5.00 0.00 0.00 0.00 0.00

District Irrigation Plan (DIP), Jagatsinghpur Page 110

74 Naugaon -do- -do- -do- Renovation of

Disty No.19-A2A

Renovation, Linning,

Earth work & Concrete

work

1 9 1 5.00 5.00 0.00 0.00 0.00 0.00

75 Naugaon -do- -do- -do-

Renovation of Disty No.19-A2A1 and construction

of Guard wall

Renovation, Linning,

Earth work & Concrete

work

1 11 1 6.00 6.00 0.00 0.00 0.00 0.00

76 Tirol -do- -do- -do- Renovation of Disty No.10-H

Earth work & Concrete

work 1 46 2 25.00 10.00 0 0.00 0.00 15.00

77 Tirol -do- -do- -do- Renovation of Disty No.10-K

Earth work & Concrete

work 1 46 2 25.00 10.00 15.00 0.00 0.00

78 Tirol -do- -do- -do- Renovation of Disty. No 10-M

Renovation, Linning,

Earth work & Concrete

work

1 37 2 20.00 0.00 0.00 0.00 10.00 10.00

79 Tirol -do- -do- -do- Renovation of

Gobindapokhori Minor

Earth work & Concrete

work 1 37 2 20.00 10.00 0 0.00 10.00 0.00

80 Tirol -do- -do- -do- Renovation of

Arijaga sub minor

Earth work & Concrete

work 1 46 2 25.00 10.00 0 10.00 5.00 0.00

81 Tirol -do- -do- -do- Renovation of sanara Minor

Earth work & Concrete

work 1 46 3 25.00 10.00 0 5.00 10.00 0.00

82 Tirol -do- -do- -do- Renovation of

salampurMinor

Earth work & Concrete

work 1 37 1 20.00 0.00 20.00 0.00 0.00 0.00

83 Tirol -do- -do- -do- Renovation of

RasalpurMinor

Earth work & Concrete

work 1 37 1 20.00 0.00 20.00 0.00 0.00 0.00

84 Tirol -do- -do- -do- Renovation of Birtol Minor

Earth work & Concrete

work 1 37 2 20.00 10.00 0 10.00 0.00 0.00

District Irrigation Plan (DIP), Jagatsinghpur Page 111

85 Tirol -do- -do- -do- Renovation of

Disty No.10-Lp

Earth work & Concrete

work 1 37 2 20.00 0 10.00 10.00 0.00 0.00

86 Balikuda -do- -do- -do-

Renovation of Alijanga Sub-minor from RD 0.600 Km to 1.830 Km with

C.C. guard wall from RD 0.650 Km to

0.850 Km.

Renovation, linning of

canal & C.C. guard wall

1 110 5 60.00 12.00 12.00 12.00 12.00 12.00

87 Balikuda -do- -do- -do-

Renovation of Titira Minor from RD

0.500 Km to 3.900 Km and

Construction of Guard wall

Renovation, Linning,

Earth work & Concrete

work

1 110 5 60.00 12.00 12.00 12.00 12.00 12.00

88 Balikuda -do- -do- -do-

Construction of VRB-cum-Surplus

Escape at RD 52.200 Km of machhagaon

canal over Dead Alaka.

Renovation, Structure

work 1 166 5 90.00 15.00 15.00 15.00 20.00 25.00

89 Balikuda -do- -do- -do-

Renovation of Iswarpur Sub-minor

from RD 00 Km to 1.00 Km and

Construction of guard wall from RD 00 Km to 0.300 Km.

Earth work & Concrete

work 1 55 5 30.00 6.00 6.00 6.00 6.00 6.00

90 Balikuda -do- -do- -do-

Renovation of Angarua Minor from

RD 4.500 Km to 5.733 Km & Bhoda Sub-minor from RD 0.545 Km to 1.450

Km & Kalio Sub-minor from RD

2.400 Km to 3.580 Km.

Renovation, Linning,

Earth work & Concrete

work

1 110 5 60.00 12.00 12.00 12.00 12.00 12.00

District Irrigation Plan (DIP), Jagatsinghpur Page 112

91 Balikuda -do- -do- -do-

Construction of Drainage syphone at

RD 0.354 Km with construction of

guard wall from RD 15 mtr to 200 Mtr & RD 980 Mtr to 1100

Mtr of Minjapada Sub-minor.

Renovation, Linning,

Earth work & Concrete

work

1 92 5 50.00 10.00 10.00 10.00 10.00 10.00

92 Balikuda -do- -do- -do-

Renovation of Disty No.15-A1 from RD 1.00 Km to 3.673

Km including construction of guard wall near village Kosida.

Renovation, Linning,

Earth work & Concrete

work

1 110 5 60.00 12.00 12.00 12.00 12.00 12.00

93 Balikuda -do- -do- -do-

Renovation of Mathasahi Sub-minor from RD

0.350 Km to 0.947 Km & Construction of 2 Nos of outlets.

Renovation, Linning,

Earth work & Concrete

work

1 74 5 40.00 8.00 8.00 8.00 8.00 8.00

94 Balikuda -do- -do- -do-

Renovation of Disty No.15-C from RD 3.00 Km to 6.126

Km.

Renovation, Linning,

Earth work & Concrete

work

1 147 5 80.00 15.00 15.00 15.00 15.00 20.00

95 Balikuda -do- -do- -do-

Renovation of Dua Sub-minor from RD 0.500 Km to 1.340

Km including construction of

guard wall from RD 0.500 Km to 0.800

Km.

Renovation, Linning,

Earth work & Concrete

work

1 46 5 25.00 5.00 5.00 5.00 5.00 5.00

96 Balikuda -do- -do- -do-

Renovation of Disty No.15-B from RD 2.00 Km to 6.086

Km & Mandakeswar Sub-minor from RD

1.50 Km to 2.011 Km.

Renovation, Linning,

Earth work & Concrete

work

1 110 5 60.00 12.00 12.00 12.00 12.00 12.00

District Irrigation Plan (DIP), Jagatsinghpur Page 113

97 Balikuda -do- -do- -do- Renovation of Disty

No.13-C

Earth work & Concrete

work 1 55 5 30.00 6.00 6.00 6.00 6.00 6.00

98 Balikuda -do- -do- -do- Renovation of

Benupur Sub-minor

Earth work & Concrete

work 1 55 5 30.00 6.00 6.00 6.00 6.00 6.00

99 Balikuda -do- -do- -do- Renovation of

Sadeipur Sub-minor

Earth work & Concrete

work 1 55 5 30.00 6.00 6.00 6.00 6.00 6.00

100 Balikuda -do- -do- -do- Renovation of

Sanakala minor

Earth work & Concrete

work 1 55 5 30.00 6.00 6.00 6.00 6.00 6.00

101 Balikuda -do- -do- -do-

Renovation of Iswarpur Sub-minor from RD 0.100 Km to 0.940 Km and construction of

Guard wall

Renovation, Linning,

Earth work & Concrete

work

1 64 5 35.00 6.00 6.00 6.00 6.00 11.00

102 Balikuda -do- -do- -do-

Renovation of Kalio Sub-minor from RD 1.500 Km to 3.580

Km and construction of

Guard wall

Renovation, Linning,

Earth work & Concrete

work

1 55 5 30.00 6.00 6.00 6.00 6.00 6.00

103 Balikuda -do- -do- -do-

Renovation of Disty No.13-B from RD

2.100 Km to 4.980 Km and

construction of Guard wall

Renovation, Linning,

Earth work & Concrete

work

1 55 5 30.00 6.00 6.00 6.00 6.00 6.00

104 Balikuda -do- -do- -do-

Renovation of Ghodadhiha Sub-minor from RD

0.500 Km to 1.820 Km and

construction of Guard wall

Renovation, Linning,

Earth work & Concrete

work

1 55 5 30.00 6.00 6.00 6.00 6.00 6.00

105 Balikuda -do- -do- -do-

Renovation of Sansailo Sub-minor from RD 0.400 Km

to 1.710 Km.

Renovation, Linning,

Earth work & Concrete

work

1 64 5 35.00 6.00 6.00 6.00 6.00 11.00

District Irrigation Plan (DIP), Jagatsinghpur Page 114

106 Balikuda -do- -do- -do-

Renovation of Arijanga Sub-minor with construction of

Guard wall

Renovation, Linning,

Earth work & Concrete

work

1 57 5 31.00 6.00 6.00 6.00 6.00 7.00

107 Biridi -do- -do- -do- Renovation ofDisty

No.2 & its sytem

Renovation, linning, Earth

work & Concrete

work

1 79 4 43.00 10.00 10.00 11.00 12.00 0.00

108 Biridi -do- -do- -do-

Renovation ofHazipur minor &

its system with Bagula Minor

Renovation, linning, Earth

work & Concrete

work

1 74 4 40.00 10.00 10.00 10.00 10.00 0.00

109 Biridi -do- -do- -do- Renovation ofDisty No.3 & its system

Renovation, linning, Earth

work & Concrete

work

1 55 4 30.00 10.00 10.00 10.00 0.00 0.00

110 Biridi -do- -do- -do- Renovation ofDisty No.4 & its system

Renovation, linning, Earth

work & Concrete

work

1 55 4 30.00 10.00 10.00 10.00 0.00 0.00

111 Biridi -do- -do- -do- Renovation ofDisty No.5 & its system

Renovation, linning, Earth

work & Concrete

work

1 64 4 35.00 10.00 10.00 10.00 5.00 0.00

112 Biridi -do- -do- -do- Renovation ofDisty No.6 & its system

Renovation, linning, Earth

work & Concrete

work

1 64 4 35.00 10.00 10.00 10.00 5.00 0.00

113 Biridi -do- -do- -do- Renovation of Gaichara right

Minor

Renovation, Linning &

R/S & Renovation of outlets &

Drainage syphon

1 74 5 40.00 8.00 8.00 8.00 8.00 8.00

District Irrigation Plan (DIP), Jagatsinghpur Page 115

114 Biridi -do- -do- -do- Renovation of

Gaichara left Minor

Renovation, Linning &

R/S & Renovation of outlets &

Drainage syphon

1 64 5 35.00 7.00 7.00 7.00 7.00 7.00

115 Biridi -do- -do- -do- Renovation of

Khajara Right Minor

Renovation, Linning &

R/S & Renovation of outlets &

Drainage syphon

1 74 5 40.00 8.00 8.00 8.00 8.00 8.00

116 Biridi -do- -do- -do- Renovation of

Khajara left Minor

Renovation, Linning &

R/S & Renovation of outlets &

Drainage syphon

1 55 3 30.00 10.00 10.00 10.00 0.00 0.00

117 Biridi -do- -do- -do- Renovation of

Chasikhanda Minor

Renovation, Linning &

R/S & Renovation of outlets &

Drainage syphon

1 37 4 20.00 5.00 5.00 5.00 5.00 0.00

118 Biridi -do- -do- -do- Renovation of

Biluakhai canal syphone

Renovation, Linning &

R/S & Renovation of outlets &

Drainage syphon

1 55 4 30.00 7.00 8.00 7.00 8.00 0.00

119 Biridi -do- -do- -do- Renovation of

Kamalpur Minor

Renovation, Linning &

R/S & Renovation of outlets &

Drainage syphon

1 40 5 22.00 5.00 5.00 5.00 5.00 2.00

District Irrigation Plan (DIP), Jagatsinghpur Page 116

120 Biridi -do- -do- -do- Renovation of

Gelapur right minor & Gelapur left minor

Renovation, Linning &

R/S & Renovation of outlets &

Drainage syphon

1 44 5 24.00 4.00 4.00 4.00 6.00 6.00

121 Biridi -do- -do- -do- Renovation of Bambilo Disty

Renovation, Linning &

R/S & Renovation of outlets &

Drainage syphon

1 64 5 35.00 7.00 7.00 7.00 7.00 7.00

122 Biridi -do- -do- -do- Renovation of

Basandara Minor

Renovation, Linning &

R/S & Renovation of outlets &

Drainage syphon

1 55 3 30.00 10.00 10.00 10.00 0.00 0.00

123 Biridi -do- -do- -do-

Renovation of Parisankharisahi

Minor & Parbatipur Minor including

guard wall

Renovation, Linning,

Earth work & Concrete

work

1 55 3 30.00 10.00 10.00 10.00 0.00 0.00

124 Biridi -do- -do- -do- Renovation of

Ukundara Minor including guard wall

Renovation, Linning,

Earth work & Concrete

work

1 55 3 30.00 10.00 10.00 10.00 0.00 0.00

125 Naugaon -do- -do- -do-

Renovation of Disty No.19 from RD

20.00 Km to 31.050 Km.

Renovation, Linning,

Earth work & Concrete

work

1 28 3 15.00 5.00 5.00 5.00 0.00 0.00

126 Naugaon -do- -do- -do- Renovation of Disty

No.19-E.

Renovation, Linning,

Earth work & Concrete

work

1 33 3 18.00 6.00 6.00 6.00 0.00 0.00

District Irrigation Plan (DIP), Jagatsinghpur Page 117

127 Naugaon -do- -do- -do- Renovation of Disty

no. 19-A2A

Renovation, Linning,

Earth work & Concrete

work

1 28 3 15.00 5.00 5.00 5.00 0.00 0.00

128 Naugaon -do- -do- -do-

Renovation of Chakuli minor,

Arakhakuda minor & Rohia minor

Renovation, Linning,

Earth work & Concrete

work

1 22 2 12.00 0.00 0.00 6.00 6.00 0.00

129 Naugaon -do- -do- -do-

Renovation of Gajarajpur minor and Construction of Guard

Wall.

Renovation, Linning,

Earth work & Concrete

work

1 22 2 12.00 0.00 0.00 6.00 6.00 0.00

130 Naugaon -do- -do- -do-

Renovation of Disty No.16-A from RD

3.500 Km to 9.555 Km and construction of

Guard wall

Renovation, Linning,

Earth work & Concrete

work

1 28 3 15.00 5.00 5.00 5.00 0.00 0.00

131 Naugaon -do- -do- -do-

Renovation of Disty No.16-B from RD 3.500

Km to 7.160 Km and construction of Guard

wall

Renovation, Linning,

Earth work & Concrete

work

1 28 3 15.00 5.00 5.00 5.00 0.00 0.00

132 Naugaon -do- -do- -do-

Renovation of Disty No.19-A2A1 and

construction of Guard wall

Renovation, Linning,

Earth work & Concrete

work

1 11 1 6.00 6.00 0.00 0.00 0.00 0.00

133 Naugaon -do- -do- -do-

Renovation of Kundeswar Sub-minor from RD 0.450 Km to

1.443 Km and construction of Guard

wall

Renovation, Linning,

Earth work & Concrete

work

1 22 2 12.00 6.00 6.00 0.00 0.00 0.00

134 Naugaon -do- -do- -do-

Renovation of Nandigram Sub-minor from RD

0.500 Km to 1.640 Km and

construction of Guard wall

Renovation, Linning,

Earth work & Concrete

work

1 37 4 20.00 5.00 5.00 5.00 5.00 0.00

District Irrigation Plan (DIP), Jagatsinghpur Page 118

135 Tirtol -do- -do- -do-

Renovation of Disty No.10-H with

construction of Guard wall

Earth work & Concrete

work 1 92 5 50.00 10.00 10.00 10.00 10.00 10.00

136 Tirtol -do- -do- -do- Renovation of Disty

No.10-K

Earth work & Concrete

work 1 92 5 50.00 10.00 10.00 10.00 10.00 10.00

137 Tirtol -do- -do- -do-

Renovation of Radhanga Extention

with repair of outlets.

Renovation, Linning,

Earth work & Concrete

work

1 98 5 53.00 10.00 10.00 10.00 10.00 13.00

138 Tirtol -do- -do- -do-

Renovation of Disty No.10-P with

construction of Guard wall & VRB

Earth work & Concrete

work 1 101 5 55.00 10.00 10.00 10.00 10.00 15.00

139 Tirtol -do- -do- -do-

Renovation of Disty No.10-L with

construction of Guard wall

Earth work & Concrete

work 1 83 5 45.00 9.00 9.00 9.00 9.00 9.00

Total State

Irrigation Department ( Irr. Dvn. Jspur.)

139 8688 4722 1143 1058 991 777 753

1 Raghunathpur

State Irrigation

Department ( Irr. Div.

Mahandi

South)

State

Plan

(RRR) Major

Irrigation

Taladanda Canal

Canals system / Disty. Minor & S/M

Repair, restoration & Renovation

1 7360 5 4000 800 800 800 800 800

2 Balikuda -do- -do- -do- Canals system /

Disty. Minor & S/M

Repair, restoration & Renovation

1 9.2 1 5 5 0 0 0 0

3 Tirtol -do- -do- -do- Canals system /

Disty. Minor & S/M

Repair, restoration & Renovation

1 7360 5 4000 800 800 800 800 800

District Irrigation Plan (DIP), Jagatsinghpur Page 119

4 Kujanga -do- -do- -do- Canals system /

Disty. Minor & S/M

Repair, restoration & Renovation

1 5520 5 3000 600 600 600 600 600

5 Erasama -do- -do- -do- Canals system /

Disty. Minor & S/M

Repair, restoration & Renovation

1 1472 2 800 500 300 0 0 0

Total

State Irrigation

Department ( Irr. Div. Mahandi

South)

5 21721 11805 2705 2500 2200 2200 2200

1 Tirtol

Irrigation

'Department ( Irr. Div.

Mahandi

Barrage)

State

Plan

(RRR) Major

Irrigation

Renovation of Mahanadi Left Branch Canal

Earth work and concrete

lining 1 110 2 60.00 30 30 0 0 0

2 Tirtol -do- -do- -do-

Renovation of Posala Minor and

Sub-Minor of Mahanadi Left Branch Canal

Earth work and const. of

concrete guard wall

1 37 1 20.00 20 0 0 0 0

3 Tirtol -do- -do- -do-

Renovation of Damodarpur Minor

of Mahanadi Left Branch Canal

Earth work and const. of

concrete guard wall,

outlets

1 74 3 40.00 20 10 10 0 0

4 Tirtol -do- -do- -do-

Renovation of Nuagaon Minor of

Mahanadi Left Branch Canal

Earth work and const. of

concrete guard wall,

outlets

1 64 1 35.00 0 35 0 0 0

5 Tirtol -do- -do- -do-

Renovation of Olagada Minor of MLD under MCII

Project

Resectioning, and Const. of through wall

1 28 1 15.00 0 0 15 0 0

District Irrigation Plan (DIP), Jagatsinghpur Page 120

6 Tirtol -do- -do- -do-

Renovation of Poragadei Minor of

MLD under MCII Project

Resectioning, and Const. of through wall

1 18 1 10.00 0 0 10 0 0

7 Tirtol -do- -do- -do-

Renovation of Khosalpur Minor of

MLD under MCII Project

Resectioning, and Const. of through wall

1 18 1 10.00 0 0 10 0 0

8 Tirtol -do- -do- -do- Renovation of

Kanimul Minor of MLBC

Earth work and const. of

concrete guard wall,

outlets

1 55 2 30.00 15 15 0 0 0

9 Tirtol -do- -do- -do- Renovation of

Paruna Minor-I of MLBC

Earth work and const. of

concrete guard wall,

outlets

1 55 2 30.00 0 0 15 15 0

10 Tirtol -do- -do- -do- Renovation of

Mirzapur Minor of PRD

Earth work and const. of

concrete guard wall,

outlets

1 28 1 15.00 0 0 0 15 0

11 Tirtol -do- -do- -do- Renovation to Jogonia Minor

1 18 1 10.00 0 0 0 0 10

12 Tirtol -do- -do- -do-

Renovation to Paika Right Distributary from RD 12km to

17km

Resectioning, Const. of

guard wall near weak

zone

1 55 1 30.00 0 0 30 0 0

13 Tirtol -do- -do- -do-

Renovation to Damodarpur Minor of M.L.B.C from RD

00 to Tail

Resectioning, Const. of

guard wall near weak

zone

1 55 1 30.00 0 0 0 0 30

14 Tirtol -do- -do- -do- Renovation to Kolta Minor-I and Minor-

II from RD 00 to Tail

Resectioning, Const. of

guard wall near weak

zone

1 74 2 40.00 20 20 0 0 0

15 Kujanga -do- -do- -do- Renovation of Mahanadi Left Distributary

Resectioning, and concrete

lining 1 74 2 40.00 20 20 0 0 0

District Irrigation Plan (DIP), Jagatsinghpur Page 121

16 Kujanga -do- -do- -do-

Renovation of Mahanadi Left

Distributary from RD 5km to 6.5km

Resectioning, Const. of

guard wall near weak

zone

1 64 2 35.00 20 15 0 0 0

17 Kujanga -do- -do- -do-

Renovation of Mahanadi Left

Distributary from RD 6.5km to 8km

Resectioning, Const. of

guard wall near weak

zone

1 55 2 30.00 0 0 15 15 0

18 Kujanga -do- -do- -do- Renovation to sarali

minor

Resectioning, Const. of

guard wall near weak

zone

1 28 1 15.00 0 0 0 0 15

19 Kujanga -do- -do- -do- Renovation to

Sampur minor-I

Resectioning, Const. of

guard wall near weak

zone

1 18 1 10.00 0 0 0 10 0

20 Kujanga -do- -do- -do- Renovation to

Sampur minor-II

Resectioning, Const. of

guard wall near weak

zone

1 28 1 15.00 0 0 15 0 0

21 Kujanga -do- -do- -do-

Renovation to Paika Right Distributary from RD 17 km to

Tail

Resectioning, Const. of

guard wall near weak

zone

1 28 1 15.00 0 0 15 0 0

Total Major Irrigation 21 984 535.00 145.00 145.00 135.00 55.00 55.00

Total State plan RRR 17062 3993 3703 3326 3032 3008

1 Jagatsinghpur

Agriculture

NA

BA

RD

Ground Water

Private Lift Irrigation

Project

Creation of New Shallow Tube well

1500 1500 5 600 120 120 120 120 120

2 Raghunathpur

Agriculture

Ground Water

Private Lift Irrigation

Project -do- 1500 1500 5 600 120 120 120 120 120

District Irrigation Plan (DIP), Jagatsinghpur Page 122

3 Biridi Agriculture

Ground Water

Private Lift Irrigation

Project

Creation of New Shallow Tube well

1500 1500 5 600 120 120 120 120 120

4 Naugaon Agriculture

Ground Water

Private Lift Irrigation

Project

Creation of New Shallow Tube well

1500 1500 5 600 120 120 120 120 120

Total NABARD

6000

6000 2400 480 480 480 480 480

1 Jagatsinghpur

Fishery

MG

NR

EG

S

Multy Purpose

Farm Pond

Farm Pond

New Construction of Farm

Pond

80 32 4 80 20 20 20 20 0

2 Raghunathpur

Fishery

Farm Pond

New Construction of Farm

Pond

80 32 4 80 20 20 20 20 0

3

Balikuda Fishery

Farm Pond

New Construction of Farm

Pond

80 32 4 80 20 20 20 20 0

4

Biridi Fishery

Farm Pond

New Construction of Farm

Pond

80 32 4 80 20 20 20 20 0

5

Naugaon Fishery

Farm Pond

New Construction of Farm

Pond

80 32 4 80 20 20 20 0 20

6

Tirtol Fishery

Farm Pond

New Construction of Farm

Pond

80 32 4 80 20 20 20 0 20

District Irrigation Plan (DIP), Jagatsinghpur Page 123

7

Kujanga Fishery

Farm Pond

New Construction of Farm

Pond

80 32 4 80 20 20 20 0 20

8

Erasama Fishery

Farm Pond

New Construction of Farm

Pond

80 32 4 80 20 20 20 0 20

1 Jagatsinghpur

Fishery

Pond

Pond Renovatio

n 40 16 4 40 10 10 10 10 0

2 Raghunathpur

Fishery

Pond Renovatio

n 40 16 4 40 10 10 10 10 0

3 Balikuda

Fishery

Pond Renovatio

n 40 16 4 40 10 10 10 10 0

4 Biridi

Fishery

Pond Renovatio

n 40 16 4 40 10 10 10 10 0

5 Naugaon

Fishery

Pond Renovatio

n 40 16 4 40 10 10 10 0 10

6 Tirtol

Fishery

Pond Renovatio

n 40 16 4 40 10 10 10 0 10

7 Kujanga

Fishery

Pond Renovatio

n 40 16 4 40 10 10 10 0 10

8 Erasama

Fishery

Pond Renovatio

n 40 32 4 80 20 20 20 0 20

Total MGNREGS 960 400 1000 250 250 250 120 130

1 EAP Mediun MCII 1 67 3 1336 500 500 336 0 0

Total EAP 1 67 1336 500 500 336 0 0

Grand Total 66914.8

7 17364.51

15357.31

13321.60

11297.72

9573.71

District Irrigation Plan (DIP), Jagatsinghpur Page 124

ABSTRACT Financial Plan for 5years & Long Term. (In Lakhs) Irrigation Potential to be Created (in Ha)

Activity 5years 20years PMKSY AIBP 0

PMKSY AIBP 0 0

PMKSY-other components

HKKP 6390

PMKSY-other components

HKKP

RRR 20767.15 PDMC 2800

Check Dam 4487 WD 140

Line Field Channels 9396.09 Total 9330

Unlined Channels 569.46

State plan

EAP (Medium) 67

Lift Irrigation 5850 MGNREGS 400

Total 41069.7 NABARD 6000

PDMC

Non -DPAP Drip 873.7345 Total 6467

Non -DPAP Sprinkler 123.44 G.Total 15797

Farm Pond 1356 Extension,Strengthening & Restoration of Ayacut(Ha)

Water Lifting Devices 1320

HKKP

RRR 8472

Total 3673.1745 Lined channel 18789

WD

RRR 276 Unlined Channels 1139

Check Dam 98 Total 28400

Total 374 Watershed Renovation 18.8

PMKSY Total 45116.8745 G. Total 28418.8

State plan

Major RRR 17062

NABARD Ground Water (PLIP) 2400 DRIP & Sprinkler Irrigation(Ha)

MGNREGS Farm Pond 1000 PDMC Non-DPAP Drip 1160

EAP Mediun 1336 Non-DPAP Sprinkler 610

State Plan Total 21798

G.Total 66914.8745 400000 Total 1770

District Irrigation Plan (DIP), Jagatsinghpur Page 125

Summary

Jagatsinghpur district has geographical area of 1,65,970 ha. It is one of the most

natural disaster-prone districts of costal Odisha. This District consists of 08 Blocks and

falls under East and South Eastern Coastal Plain agro-ecological zone having normal

annual rainfall of 1514.60 mm in 66 numbers of rainy days. Rice and pulses (green

gram and black gram) is the main crop of this district during Kharif and rabi season

respectively. Due to erratic distribution of rainfall, more than 80% rainfall occurs during

monsoon season only. Hence kharif irrigated area in around 70%. But during rabi

season, maximum area remains fallow or irrigation is not provided to pulse due to non

availability of required amount of water to the crops. Hence the production and

productivity of rabi crops is very low in the district. Only 35% areas are being irrigated in

rabi season. The District is also surrounded by River system the Mahanadi and Paika in

North and Devi in the South West. Due to its geographical situation, the district is

congenial and prone to occurrence of various natural calamities like flood or cyclone or

drought in almost every year. Water logging is the constraint during Kharif due to poor

drainage facilities. The domestic, livestock, irrigation and industrial requirement of water

for the district is 2.50 BCM. But at present only 1.64 BCM of water is available from

both surface and groundwater resources. By end of 2020 the requirement may increase

to 2.85 BCM. Hence, an additional 1.21 BCM of water potential need to be created by

2020. The block wise strategic planning under this scheme is explained in this

document. Planning is made for different projects at an estimated cost of Rs. 669 Crore

to increase the irrigation potential by 15797 ha along with improving the available

facilities. This will increase the provision of irrigation from the present level of 53% to

70%. A long term action plan (for 20 years) is also proposed to develop a major

irrigation project with estimated cost of Rs. 4000 Crore.

District Irrigation Plan (DIP), Jagatsinghpur Page 126

For more information please contact:

Collector & District Magistrate

At/Po/Dist: Jagatsinghpur, PIN-754103

Phone: 06724-220379,

Fax: 06724-220299

Email: [email protected]