District Irrigation Plan (DIP), Jagatsinghpur
DISTRICT IRRIGATION PLAN
OF
JAGATSINGHPUR
(ODISHA)
PRADHAN MANTRI KRISHI SINCHAYEE YOJANA
(PMKSY)
MARCH-2016
DISTRICT LEVEL IMPLEMENTATION COMMITTEE
JAGATSINGHPUR, ODISHA
District Irrigation Plan (DIP), Jagatsinghpur
Prepared by:
District Level Implementation Committee, Jagatsinghpur, Odisha
Technical Support by:
ICAR-Indian Institute of Water Management
Bhubaneswar-751023
District Irrigation Plan (DIP), Jagatsinghpur
CONTENTS
Chapter Contents Page No
1
Executive Summary General Information of the District.
1 2
1.1 District Profile 2
1.2 Demography 4
1.3 Biomass and Livestock 5
1.4 Agro-Ecology, Climate, Hydrology and Topography 6
1.5 Soil Profile 7
1.7 Land Use Pattern 7
2 District Water Profile 28
2.1 Area Wise, Crop Wise Irrigation Status 28
2.2 Production and Productivity of Major Crops 28
2.3 Irrigation Based Classification 29
3 Water Availability 37
3.1 Status of Water Availability 37
3.2 Status of Ground Water Availability 37
3.3 Status of Command Area 37
3.4 Existing Type of Irrigation 37
District Irrigation Plan (DIP), Jagatsinghpur
Chapter Contents Page No
4
Water Requirement / Demand
45
4.1 Domestic Water Demand 45
4.2 Crop Water Demand 46
4.3 Livestock Water Demand 55
4.4 Industrial Water Demand 55
4.5 Water Demand for Power Generation 56
4.6 Total Water Demand of the District for Various Sectors 56
4.7 Water Budget 57
5 Strategic Action Plan for Irrigation in district under PMKSY
59
6 Summary 125
District Irrigation Plan (DIP), Jagatsinghpur
List of Tables
Table No. Details Page No.
Table 1.1 General Profile of Jagatsinghpur District 2
Table 1.2 Demography 4
Table 1.3 Biomass and Live stock 6
Table 1.4 Agro-Ecology, Climate, Hydrology and Topography
8
Table 1.5 Soil Profile 9
Table 1.7 Land use pattern of Jagatsinghpur 11
Table 2.1 Area-wise, Crop-wise Irrigation Status (Jagatsinghpur)
30
Table 2.2. Production and Productivity of major Crops (Jagatsinghpur Dist.)
33
Table 2.3 Irrigation based Classification 36
Table 3.1(a) Status of Water Availability (Irrigation Potential available)
38
Table 3.1 (b) Status of Water Availability 38
Table 3.1 (c) Block wise Status of Water Availability 39
Table 3.2 Status of Ground Water Availability 43
Table 3.3 Status of command area 43
Table 3.4 Existing types of Irrigation 44
Table 4.1 Domestic Water Demand 45
Table 4.2 Crop water demand 46
Table 4.3 Livestock Water Demand 55
Table 4.4 Industrial Water Demand 56
Table 4.6 Total Water Demand of the District for Various Sectors
57
Table 4.7 Water Budget 58
Table 5. Strategic Action Plan for Irrigation in district under PMKSY
67
Table 6. Abstract 124
District Irrigation Plan (DIP), Jagatsinghpur
List of Figures
Fig. No Details
Page No.
Fig. 1.1 Map of Jagatsinghpur in Odisha 3
Fig. 1.2 Blocks in Jagatsinghpur district 3
Fig. 1.3 Rural and urban population of Jagatsinghpur dist
5
Fig. 1.4 Categirization of population 5
Fig.1.5 Livestock of Jagatsinghpur 6
Fig 1.6 Soil Resource Map of Jagatsinghpur District 12
Fig. 1.7 Slope Map of Jagatsinghpur District 17
Fig. 1.8 Land use map of Jagatsinghpur Dist. 22
Fig. 1.9 Basin Map of Jagatsinghpur Dist. 27
Fig.5.1 Existing water resource of Jagatsinghpur block (River, canal, drain and water bodies)
59
Fig. 5.2 Existing water resource of Raghunathpur block (River, canal, drain and water bodies)
60
Fig.5.3 Existing water resource of Balikuda block (River, canal, drain and water bodies)
61
Fig.5.4 Existing water resource of Biridi block (River, canal, drain and water bodies)
62
Fig.5.5 Existing water resource of Nuagaon block (River, canal, drain and water bodies)
63
Fig.5.6 Existing water resource of Tirtol block (River, canal, drain and water bodies)
64
Fig. 5.7 Existing water resource of Kujanga block (River, canal, drain and water bodies)
65
Fig.5.8 Existing water resource of Erasama block (River, canal, drain and water bodies)
66
District Irrigation Plan (DIP), Jagatsinghpur Page 1
EXECUTIVE SUMMARY
Jagatsinghpur District is situated in the east cost of Odisha where agriculture is the main stay of the District. About 70% of the total population directly or indirectly depends on agriculture. Rice and pulses (green gram and black gram) is the main crop of this district during Kharif and rabi season respectively. The average annual rainfall of this district is 1514.6 mm with 66 numbers of rainy days. Due to erratic distribution of rainfall, more than 80% rainfall occurs during monsoon season only. Hence kharif irrigated area is around 70%. But during rabi season, maximum area covers under pulses and oilseeds by utilizing available residual moisture or irrigation is not provided to rabi crops due to non availability of required amount of Irrigation water. Hence the production and productivity of rabi crops is very low in the district. Only 35% areas are being irrigated in rabi season. The District is also surrounded by River system the Mahanadi and Paika in North and Devi in the South West. Due to its geographical situation, the district is congenial and prone to occurrence of various natural calamities like flood, draught or cyclone in almost every year. Water logging is the constraint during Kharif due to poor drainage facilities. Hence with the above conditions, district Irrigation Plan (DIP) under Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) is being prepared for creation, development of water resources, strengthening water distribution network and to increase the water use efficiency in the district so that agriculture production and productivity could be enhanced.
Present District Irrigation plans (DIPs) represents planning and implementation of the Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) both for short and long term. This scheme has four programme components, namely, AIBP, Har Khet ko Pani, Per drop more crop and watershed development. The domestic, livestock, irrigation and industrial requirement of water for the district is 2.50 BCM. But at present only 1.64 BCM of water is available from both surface and groundwater resources. By end of 2020 the requirement may increase to 2.85 BCM. Hence, an additional 1.21 BCM of water potential need to be created by 2020. This can be met with planning of three components under PMKSY. At present 300 ha is under micro irrigation and provision is made to increase 1770 ha under the micro irrigation system to horticultural and cash crops so that 2070 ha will be brought under the system. The block wise strategic planning under this scheme is explained in this document. Planning is made for an estimated cost of Rs. 66914.87 Lakhs to increase the irrigation potential by 15797 ha along with improving the available facilities. This will increase the provision of irrigation from the present level of 55.3 % to 70 %.
District Irrigation Plan (DIP), Jagatsinghpur Page 2
C H A P T E R- I
General Information of the District
1.1 District Profile
Jagatsinghpur District is located in the East Cost of Odisha surrounded by
Kendrapara District in North East, Puri District and Bay of Bengal in South, Cuttack District in West and Bay of Bengal in East. This District is situated in between latitude of 20 degree to 21 degree North and longitude of 84 degree to 87 degree 3’ East. The District is also surrounded by river system the Mahanadi and Paika in North and Debi in South West having a Geographical area of 1, 65,970 ha. Jagatsinghpur is one of the most natural disaster-prone districts of costal Odisha This District consists of 08 Blocks, 08 Tahasils, 194 GPs, 02 Municipalities and 1292 revenue villages. The Block wise location details are presented vide table No.1.1 and map 1(a).
TABLE 1.1 General Profile of Jagatsinghpur District
Sl District / Blocks Code Latitude Longitude
Dist: Jagatsingpur 380 19°58’ to 20°23’ N 86°3’ to 86°45’ E
1 Jagatsinghpur block 20° 15' 17.6400'' N 86° 10' 14.2392'' E
2 Raghunathpur block 20° 22' 3.8676'' N 86° 9' 31.1148'' E
3 Balikuda block 20° 8' 28.3848'' N 86° 16' 22.7712'' E
4 Biridi block 20° 20' 8.6712'' N 86° 3' 24.4224'' E
5 Nuagaon block 21° 6' 36.8100'' N 84° 43' 25.3920'' E
6 Tirtol block 20° 18' 12.0456'' N 86° 20' 47.5728'' E
7 Kujanga block 20° 19' 2.7228'' N 86° 31' 38.7912'' E
8 Erasama block 20° 12' 4.8276'' N 86° 24' 9.9576'' E
District Irrigation Plan (DIP), Jagatsinghpur Page 3
Fig 1.1: Jagatsinghpur in India and Odisha map
Fig. 1.2 Blocks in Jagatsinghpur dist.
District Irrigation Plan (DIP), Jagatsinghpur Page 4
1.2 Demography
This is one of the thickly populated districts having total population of 11, 36,971 as per 2011 census with population density of 681 per sq. kilometer area. Out of the total population male, female and children population are 520710, 506012 and 110249 respectively. Similarly, the population of SC, ST and General category are 248152, 7862 and 880957 respectively. The sex ratio is 967 and literacy rate is 87.13 %. The detail Block wise demographic profile of Jagatsinghpur District is presented vide table.1.2
Table 1.2 Demography
Sl No
Name of the Block
No. of GP
No. of
villages
Population SC
Population
ST Popula
tion
General Populati
on
Total No of
households Male Female
Children (_06)
Total
1 Jagatsinghpur 29 166 64869 63833 13265 141967 35193 628 106146 32176
2 Raghunathpur 19 87 38387 37281 7978 83646 20664 1421 61561 19918
3 Balikuda 30 237 75824 74045 15406 165275 33078 260 131937 37856
4 Biridi 21 81 38160 36668 7967 82795 26882 522 55391 19553
5 Naugaon 16 90 35116 35222 7296 77634 14437 263 62934 18878
6 Tirtol 27 249 72604 73237 15259 161100 33247 387 127466 36285
7 Kujanga 27 174 80969 77596 17500 176065 41187 462 134416 38443
8 Erasama 25 210 65684 65273 15316 146273 29514 629 116130 33703
9 Jagatsinghpur(M) 0 20 15781 14991 2859 33631 6783 366 26482 7010
10 Paradeep(M) 0 7 33316 27866 7403 68585 7167 2924 58494 68585
All Blocks 194 1321 520710 506012 110249 1136971 248152 7862 880957 261307
Total District including urban 445037 410881 106871 962789 136399 58691 767699 228315
(Source: Census data,2011)
District Irrigation Plan (DIP), Jagatsinghpur Page 5
Fig. 1.3 Rural and urban population of Jagatsinghpur dist.
Fig. 1.4 Categorization of population
District Irrigation Plan (DIP), Jagatsinghpur Page 6
1.3 Biomass and Livestock The district has a livestock population of 916042 consisting of 4,73,414
poultry, 4300 dogs, 3011 pigs, 119178 goats, 14738 sheeps, 69823 indigenous cow,
143700 hydride cow, 10246 buffalo and 77632 draft animals. Block wise detail live
stock population is presented in table No.1.3
Table 1.3 Biomass and Livestock
Sl Blocks
Small Animals Large Animals Total
Poultry (No.)
Ducks (Nos.)
Pigs (Nos.)
Goats (Nos.)
Sheeps (Nos.)
Indigenous Cow (Nos.)
Hybrid Cow
(Nos.)
Hybrid Buffalo (Nos.)
1 Jagatsinghpur 141342 221 173 21547 3847 4721 25254 590 206036
2 Raghunathpur 94391 139 0 11500 1948 1392 13160 437 127465
3 Balikuda 27954 229 131 20889 872 5615 33078 2509 102423
4 Biridi 76853 24 68 10324 2919 2852 14733 111 114085
5 Naugaon 21012 552 169 14378 1136 2457 16985 1033 64082
6 Tirtol 77402 531 358 20155 2620 15642 16232 2726 147210
7 Kujanga 14662 1648 1738 7989 874 14654 17285 2168 73057
8 Erasama 19798 956 374 12396 522 22490 6973 672 81684
Total 473414 4300 3011 119178 14738 69823 143700 10246
Fig.1.5 Livestock of Jagatsinghpur
District Irrigation Plan (DIP), Jagatsinghpur Page 7
1.4 Agro-Ecology, Climate, Hydrology and Topography
The district is coming under East and South Eastern Coastal Plain agro-ecological zone having normal annual rainfall of 1514.60 mm in 65.5 nos of rainy days. Out of which about 80% of total precipitation received during kharif season (June to September). The maximum temperature is 37.70C during summer and minimum temperature is 11.20C during winter. Generally summer lasts from March to May and winter from October to February. The evapotranspiration during summer, winter and rainy season comes to 587, 772 and 694 mm with cumulative annual value of 2053mm. The detail Block wise agro-ecology, climate, Hydrology and Topography is given below in table No.1.4. Jagatsinghpur is situated over alluvial plains of the river Mahanadi, Kathojodi, Devi, their tributaries and distributaries. The district comprises of two distinct tracts, the first being marshy and swampy strips along with the coast covered with wild growth of reeds and tropical jungle. The second tract covers fertile plain land. Most of rivers like Mahanadi, Alaka, Biluakhai, Hansua, Devi & Paika pass through the district. The huge deposit of silt of rivers has built up the present alluvium tracts at their meeting places with the sea. Due to creation of swamp at the meeting places with the sea, dense jungles have grown up. The district is situated in coastal plain zone as per agro- climatic classification and in deltaic alluvial plains of the river system with numbers of estuaries, creek on the coastal belt. 1.5 Soil Profile The soil of Jagatsinghpur district is categorized into three type’s i.e. laterite, alluvial and saline. The laterite soil is mainly found in Biridi, Raghunathpur and Jagatsinghpur blocks. Similarly the deltaic alluvial soil is found in western side of Nuagaon, Tirtol, Balikuda, Ersama, Raghunathpur and Jagatsinghpur and texture of soil is generally sandy, sandy loam, salty loam, and clay loam to heavy clay. On the whole this alluvial soil is fertile. Another saline inundated soil is found in the part of Kujanga, Balikuda and Ersama blocks of the District, adjacent to the sea. Area under deep alluvial soil is 89700 thousand ha followed by costal saline soils 53700 thousand and laterite soil 20500 thousand respectively. The details of soil type and land slope of the district are presented below in table No.1.5. Soil type of the district is dominated by Mixed gray soil (inseptisols) which covers around 1,10,200 ha (Fig. ). Nearly 127809.25 ha, 172.23 ha and 0.27 ha area of the district lies under land slope of 0-3%, 3-8% and 8-25 %. The soil profile table, Soil profile map and slope map are given in table No.1.5, 1.5 (a) and 1.5 (b) respectively. 1.7 Land Use Pattern
The detail block wise land use pattern of this district presented below in table No.1.7. The district is having a total geographical area of 1,65,970 ha out of which the gross cropped area is 203834 ha. Net sown area is around 104335 ha with cropping intensity of 195%. Total forest cover is around 5825 ha and the waste land is nearly 52958 ha.
District Irrigation Plan (DIP), Jagatsinghpur Page 8
Table : 1.4 Agro-Ecology, Climate, Hydrology and Topography
Name of the Block Block area (ha.)
Normal annual Rainfall
(mm)
Average
Monthly
Rainfall (mm)
No. of Rainy days (No.)
Average weekly Temperature (ºC) Potential Evapo-Transpiration
(PET)
Mean elevation
Period Period
Cumulative Total
Summer (March-May)
Winter (Oct.-Feb.)
Rainy (June-Sept.) Summ
er Winter
Rainy Season
Max Min Max Min Max Min
Jagatsinghpur 18388 1514.6 118.3 69 27 32.50 19.83 28.83 27.25 32.00 587 772 694 2053 559
Raghunathpur 9769 1514.6 87.33 64 27 32.50 19.83 28.83 27.25 32.00 587 772 694 2053 173
Balikuda 28520 1514.6 115.0 59 27 32.50 19.83 28.83 27.25 32.00 587 772 694 2053 8
Biridi 10642 1514.6 116.3 73 27 32.50 19.83 28.83 27.25 32.00 587 772 694 2053 16
Naugaon 11576 1514.6 57.83 56 27 32.50 19.83 28.83 27.25 32.00 587 772 694 2053 8
Tirtol 22543 1514.6 82.83 72 27 32.50 19.83 28.83 27.25 32.00 587 772 694 2053 8
Kujanga 27421 1514.6 93.75 55 27 32.50 19.83 28.83 27.25 32.00 587 772 694 2053 5
Erasama 37111 1514.6 77.58 54 27 32.50 19.83 28.83 27.25 32.00 587 772 694 2053 8
District Irrigation Plan (DIP), Jagatsinghpur Page 9
1.5 Soil Profile
Soil Type Land Slope
Name of the Block
Major Soil Classes Area (ha.)
0-3% (ha.) 3-8% (ha.)
8-25% (ha.)
Jagatsinghpur Mixed Grey Soil (Inceptisols) 12187.76 12167.28 20.49
Unaltered Soils With Coarse Parent Materials (Entisols)
1737.25 1732.96 4.29
Settlement 3299.49
Waterbody 659.04
Raghunathpur Mixed Grey Soil (Inceptisols) 7100.24 7097.13 3.11
Unaltered Soils With Coarse Parent Materials (Entisols)
560.44 560.44
Unclassified Soil ( Like Mud Flats)
236.69 236.69
Settlement 2296.81
Waterbody 779.97
Balikuda Mixed Grey Soil (Inceptisols) 20019.03 20012.71 6.32
Unaltered Soils With Coarse Parent Materials (Entisols)
1532.34 1528.40 3.93
Unclassified Soil( Like Mud Flats)
760.00 742.53 17.47 0.19
Settlement 2675.72
Waterbody 4292.21
Biridi Mixed Grey Soil (Inceptisols) 7577.99 7577.49 0.50
Unaltered Soils With Coarse Parent Materials (Entisols)
268.84 268.84
Unclassified Soil( Like Mud Flats)
164.73 162.58 2.15
Settlement 1854.75
Waterbody 657.91
Naugaon Mixed Grey Soil (Inceptisols) 8430.46 8401.13 29.33
Unaltered Soils With Coarse Parent Materials (Entisols)
338.35 338.35
District Irrigation Plan (DIP), Jagatsinghpur Page 10
Unclassified Soil( Like Mud Flats)
155.48 144.15 11.33
Settlement 1354.44
Waterbody 1324.50
Tirtol Mixed Grey Soil (Inceptisols) 16159.45 16148.70 10.75
Unaltered Soils With Coarse Parent Materials (Entisols)
1270.83 1268.25 2.58
Unclassified Soil( Like Mud Flats)
289.21 289.21
Settlement 3115.31
Waterbody 1180.79
Kujanga Mixed Grey Soil (Inceptisols) 16316.49 16310.19 6.30 0.08
Unaltered Soils With Coarse Parent Materials (Entisols)
1665.44 1659.70 5.74
Unclassified Soil( Like Mud Flats)
1178.50 1170.60 7.90
NA 0.03
Habitation 2518.15
Settlement 2382.88
Waterbody 3521.08
Erasama Mixed Grey Soil (Inceptisols) 22410.91 22400.86 10.05
Unaltered Soils With Coarse Parent Materials (Entisols)
7231.87 7204.06 27.80
Unclassified Soil( Like Mud Flats)
389.19 387.00 2.19
Settlement 1816.84
Waterbody 5088.34
Total 166799.73 127809.25 172.23 0.27
District Irrigation Plan (DIP), Jagatsinghpur Page 11
1.7 Land use pattern
Name of the State : Odisha
Name of District : Jagatsinghpur
Area in ha.
SI. No. Name of the Block No of Gram
Panchayat
No of the villages covered
Total Geographical
Area
Area under Agriculture Area
under Forest
Area under Wasteland
Area under
other uses Gross cropped area (1)
Net sown Area (2)
Area sown more than once (1-2)
Cropping Intensity
(%)
1 Jagatsinghpur 29 166 18388 28928 14411 14517 201% 0 0 3977
2 Raghunathpur 19 87 9769 15991 7942 8049 201% 223 688 916
3 Balikuda 30 237 28520 31626 16103 15523 196% 148 0 12269
4 Biridi 21 81 10642 16223 8208 8015 198% 400 380 1654
5 Naugaon 16 90 11576 17436 9075 8361 192% 0 153 2348
6 Tirtol 27 249 22543 30265 15226 15039 199% 168 816 6333
7 Kujanga 27 174 27421 31161 15564 15597 200% 473 1702 9682
8 Erasama 25 210 37111 32204 17806 14398 181% 1440 2086 15779
Total 194 1294 165970 203834 104335 99499 195% 2852 5825 52958
District Irrigation Plan (DIP), Jagatsinghpur Page 22
Fig. 1.8 land use, land cover map of Jagatsinghpur
District Irrigation Plan (DIP), Jagatsinghpur Page 28
C H A P T E R- II
District Water Profile
2.1 Area wise crop wise irrigation status
Jagatsinghpur district is one of the thickly populated costal districts of Odisha
and main stream of economy comes from agriculture. As per Agro climatic Condition,
the entire Jagatsinghpur District comes under, East and South Eastern Coastal plain
with hot and humid climates having average normal Rainfall 1521.16 mm. More than
75% of the precipitation is concentrated over five months i.e. from June to October.
Out of total irrigated area of 104335 ha in kharif season, 73955 ha (70%) is being
irrigated whereas in rabi season out of 99480 ha rabi irrigated areas, only 34796 ha
(35%) is being irrigated till date.
The district is webbed by a network of rivers and plains of the entire district lie in
between River Mahanadi in the north and Devi-Biluakhai in the south. During rains
the river and its branches carry great volume of water in them and at the time of high
floods they try to overflow their banks. Jagatsinghpur is having two main canals i.e.
Taladanda & Machhagaon which are chief sources of irrigation in the district. The
details of cropped area and the irrigation status are presented in table No.2.1.
It is well acknowledged that associated with irrigation, there is the problem of water
logging in the command area which not only reduces agricultural production but also
poses a threat to the environment. The problem further aggravates with topographic,
geographic and meteorological factors coupled with other human activities, viz
encroachment of the natural drainage paths, injudicious use of irrigation water,
development of infrastructure on flood prone zones etc. So the long term
sustainability needs not only the optimal utilization of water resources and
management of water resources infrastructures but also development of good
drainage to curb the problem of water logging and consequent development of
agricultural development.
District Irrigation Plan (DIP), Jagatsinghpur Page 29
So far the Jagatsinghpur district is concerned; water logging has great impact upon
the socio economic status of the district because still the economics of the district is
agrarian with major command lying in the coastal belt. To overcome the difficulties in
poor drainage of rain and flood water and retrieval of the water logged area in
Jagatsinghpur with a view to increasing the agricultural production, drainage should
also given priority. Remedial measures for which renovation of major drains and
lateral drains needs periodic investment on operation and maintenance, dredging of
outfall points at regular intervals for effective functioning of the system.
2.2 Production and productivity of major crops
The total landmass area of Jagatsinghpur district is 172240 hects, out of which
91162 hectors of land was net area shown in the year 2010-11. The major crops
grown in the district is paddy and Mung, Biri, groundnut, jute sugarcane, Kulthi, Til,
ragi, potato, mustard etc. Around 5458 hectors of land is covered with forests and
2350 hectors of land has been used for misc. trees and groves. Cropping activities
can go on throughout the year in Odisha provided irrigation facilities are available for
crops. The production and productivity of major category of crops both in irrigated
and rainfed areas are given below in table No.2.2
2.3 Irrigation based Classification
The district has a gross irrigated area of 108751 ha and net irrigated area is 34796
ha and non-irrigated area is 30380 ha during Kharif and 69539 ha during rabi. The
details block wise irrigation based classification is given in table No.2.3.
District Irrigation Plan (DIP), Jagatsinghpur Page 30
2.1 Area-wise, Crop-wise Irrigation Status Source: Department of Agriculture, Agriculture Statistic of State, Agristat,2014-15
Name of the State: Odisha
Name of the District: Jagatsinghpur
Name of the Block
Crop Type Kharif (Area in ha) Rabi Area in ha Summer Crop (Area in ha) Total (Area in ha
Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total
Jag
ats
ing
hp
ur
A) Cereals 10950 286 11236 34 0 34 0 0 0 10984 286 11270
B) Coarse Cereals 0 0 0 0 0 0 0 0 0 0 0 0
C) Pulses 0 20 20 33 8597 8630 0 0 0 33 8617 8650
D) Oil Seeds 0 1 1 55 737 792 0 0 0 55 738 793
E) Fibre 0 10 10 0 0 0 0 0 0 0 10 10
F) Any other crops... 2578 550 3128 4062 0 4062 1015 0 1015 7655 550 8205
Total of the Block 13528 867 14395 4184 9334 13518 1015 0 1015 18727 10201 28928
Rag
hu
nath
pu
r
A) Cereals 6425 510 6935 75 0 75 0 0 0 6500 510 7010
B) Coarse Cereals 0 0 0 0 0 0 0 0 0 0 0 0
C) Pulses 0 11 11 33 4822 4855 0 0 0 33 4833 4866
D) Oil Seeds 0 1 1 46 337 383 0 0 0 46 338 384
E) Fibre 0 10 10 0 0 0 0 0 0 0 10 10
F) Any other crops... 920 119 1039 2146 0 2146 536 0 536 3602 119 3721
Total of the Block 7345 651 7996 2300 5159 7459 536 0 536 10181 5810 15991
Baliku
da
A) Cereals 11216 2132 13348 35 0 35 0 0 0 11251 2132 13383
B) Coarse Cereals 0 0 0 0 0 0 0 0 0 0 0 0
C) Pulses 0 17 17 36 9525 9561 0 0 0 36 9542 9578
D) Oil Seeds 0 1 1 108 427 535 0 0 0 108 428 536
E) Fibre 0 9 9 0 0 0 0 0 0 0 9 9
F) Any other crops... 1690 1004 2694 4341 0 4341 1085 0 1085 7116 1004 8120
Total of the Block 12906 3163 16069 4520 9952 14472 1085 0 1085 18511 13115 31626
District Irrigation Plan (DIP), Jagatsinghpur Page 31
Name of the Block
Crop Type Kharif (Area in ha) Rabi Area in ha Summer Crop (Area in ha) Total (Area in ha
Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total
Bir
idi
A) Cereals 5728 297 6025 26 0 26 0 0 0 5754 297 6051
B) Coarse Cereals 0 0 0 0 0 0 0 0 0 0 0 0
C) Pulses 0 9 9 65 4379 4444 0 0 0 65 4388 4453
D) Oil Seeds 0 2 2 53 464 517 0 0 0 53 466 519
E) Fibre 0 10 10 0 0 0 0 0 0 0 10 10
F) Any other crops... 1830 265 2095 2476 0 2476 619 0 619 4925 265 5190
Total of the Block 7558 583 8141 2620 4843 7463 619 0 619 10797 5426 16223
Nau
gao
n
A) Cereals 2300 4814 7114 97 0 97 0 0 0 2397 4814 7211
B) Coarse Cereals 0 0 0 0 0 0 0 0 0
C) Pulses 0 8 8 43 3212 3255 0 0 0 43 3220 3263
D) Oil Seeds 0 0 0 95 2642 2737 0 0 0 95 2642 2737
E) Fibre 9 9 0 0 0 0 0 0 0 9 9
F) Any other crops... 1334 590 1924 1834 0 1834 458 0 458 3626 590 4216
Total of the Block 3634 5421 9055 2069 5854 7923 458 0 458 6161 11275 17436
Tir
tol
A) Cereals 11429 1466 12895 27 0 27 0 0 0 11456 1466 12922
B) Coarse Cereals 0 0 0 0 0 0 0 0 0 0 0 0
C) Pulses 0 20 20 34 4829 4863 0 0 0 34 4849 4883
D) Oil Seeds 0 2 2 63 1171 1234 0 0 0 63 1173 1236
E) Fibre 0 5 5 0 0 0 0 0 0 0 5 5
F) Any other crops... 1979 433 2412 3446 3600 7046 1761 0 1761 7186 4033 11219
Total of the Block 13408 1926 15334 3570 9600 13170 1761 0 1761 18739 11526 30265
District Irrigation Plan (DIP), Jagatsinghpur Page 32
Name of the Block
Crop Type Kharif (Area in ha) Rabi Area in ha Summer Crop (Area in ha) Total (Area in ha
Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total
Ku
jan
ga
A) Cereals 10057 3468 13525 317 0 317 0 0 0 10374 3468 13842
B) Coarse Cereals 0 0 0 0 0 0 0 0 0 0 0 0
C) Pulses 0 34 34 43 8006 8049 0 0 0 43 8040 8083
D) Oil Seeds 0 2 2 82 3211 3293 0 0 0 82 3213 3295
E) Fibre 0 6 6 0 0 0 0 0 0 0 6 6
F) Any other crops... 1463 706 2169 3013 0 3013 753 0 753 5229 706 5935
Total of the Block 11520 4216 15736 3455 11217 14672 753 0 753 15728 15433 31161
Era
sam
a
A) Cereals 3081 12425 15506 777 0 777 0 0 0 3858 12425 16283
B) Coarse Cereals 0 0 0 0 0 0 0 0 0 0 0 0
C) Pulses 0 29 29 186 8218 8404 0 0 0 186 8247 8433
D) Oil Seeds 0 1 1 60 506 566 0 0 0 60 507 567
E) Fibre 0 8 8 0 0 0 0 0 0 0 8 8
F) Any other crops... 969 1116 2085 3862 0 3862 966 0 966 5797 1116 6913
Total of the Block 4050 13579 17629 4885 8724 13609 966 0 966 9901 22303 32204
Dis
tric
t T
ota
l
A) Cereals 61186 25398 86584 1388 0 1388 0 0 0 62574 25398 87972
B) Coarse Cereals 0 0 0 0 0 0 0 0 0 0 0 0
C) Pulses 0 148 148 473 51588 52061 0 0 0 473 51736 52209
D) Oil Seeds 0 10 10 562 9495 10057 0 0 0 562 9505 10067
E) Fibre 0 67 67 0 0 0 0 0 0 0 67 67
F) Any other crops... 12763 4783 17546 25180 3600 28780 7193 0 7193 45136 8383 53519
Total 73949 30406 104355 27603 64683 92286 7193 0 7193 108745 95089 203834
District Irrigation Plan (DIP), Jagatsinghpur Page 33
2.2 Production and Productivity of major Crops
Name of the Bloc
k
Season
Crop Sown Rainfed Irrigated Total
Cereals
coarse
cereals
pulses
oilseeds
fibre crop
s
Any other crops
Area(ha)
Producttion(Ton/yr
)
Productivity or
Yield(kg/ha)
Cost of Cultivat
on (Rs./ha)
Product! on (Ton /yr)
Productivity (Kgs/h
a)
Cost of Cultivation (Rs./ha)
Product! on (Ton
/yr)
Productivity (Kgs/ha)
Cost of Cultivat
ion (Rs./ha)
Ja
gats
ing
hp
ur A. Kharif 11236 20 1 10 3128 14395 3547 4091 21000 68343 5052 23000 71890 4994.1
B. Rabi 34 8630 792 0 4062 13518 41630 4460.04 22000 19297 4612 24000 60927 4507.1
Summer 0 0 0 0 0 1015 1015 0 0 0 12586 12400 24000 12586 12400 Horticultural & Plantation 0
Total 11270 0 8650 793 10 8205 28928 45177 4429 10022
6 5352 145403 5026.38
Rag
hu
nath
pu
r A. Kharif 6935 11 1 10 1039 7996 3440 5285 21000 42836 5832 23000 46276.29 5787.43
B. Rabi 75 4855 383 0 2146 7459 27471 5324.87 22000 12719 5530 24000 40190 5388.12
Summer 0 0 0 0 0 536 536 0 0 0 6593 12300 24000 6593 12300.4 Horticultural & Plantation
0
Total 7010 0 4866 384 10 3721 15991 30911 5320 62148 6104 93059.29 5819.48
Bali
ku
da
A. Kharif 13348 0 17 1 9 2694 16069 15437 4881 21000 65846 5102 23000 81283.34 5058.39
B. Rabi 35 0 9561 535 0 4341 14472 38489 3867.46 22000 18080 4000 24000 56569 3908.86
Summer 0 0 0 0 0 1085 1085 0 0 0 12803 11800 24000 12803 11800 Horticultural & Plantation
0
Total 13383 0 9578 536 9 8120 31626 53926 4112 96729 5225 150655.3 4763.65
Bir
idi
A. Kharif 6025 0 9 2 10 2095 8141 3022 5183 21000 50896 6734 23000 53917.84 6623
B. Rabi 26 0 4444 517 0 2476 7463 29293 6048.52 22000 16236 6197 24000 45529 6100.63
Summer 0 0 0 0 0 619 619 0 0 0 6685 10800 24000 6685 10799.7 Horticultural & Plantation
0
Total 6051 0 4453 519 10 5190 16223 32315 5956 73817 6837 106131.8 6542.06
District Irrigation Plan (DIP), Jagatsinghpur Page 34
Name of the Bloc
k
Season
Crop Sown Rainfed Irrigated Total
Cereals
coarse
cereals
pulses
oilseeds
fibre crop
s
Any other crops
Area(ha)
Producttion(Ton/yr
)
Productiv ity or
Yield(kg/ha)
Cost of Cultivat
on (Rs./ha)
Product! on (Ton /yr)
Productivity (Kgs/h
a)
Cost of Cultivation (Rs./ha)
Product! on (Ton
/yr)
Productivity (Kgs/ha)
Cost of Cultivat
ion (Rs./ha)
Nau
ga
on
A. Kharif 7114 8 0 9 1924 9055 25657 4733 21000 17679 4865 23000 43336 4785.86
B. Rabi 97 3255 2737 0 1834 7923 26318 4496 22000 9811 4742 24000 36129 4560.02
Summer 0 0 0 0 0 458 458 0 0 0 5313 11600 24000 5313 11600.4
Horticultural & Plantation
0
Total 7211 0 3263 2737 9 4216 17436 51975 4610 32803 5324 84778 4862.24
Tir
tol
A. Kharif 12895 0 20 2 5 2412 15334 6818 3540 21000 57990 4325 23000 64807.75 4226.41
B. Rabi 27 0 4863 1234 0 7046 13170 47009 4897 22000 19089 5347 24000 66098 5018.83
Summer 0 0 0 0 0 1761 1761 0 0 0 21484 12200 24000 21484 12199.9
Horticultural & Plantation
0
Total 12922 0 4883 1236 5 1121
9 30265 53827 4670 98563 5260 152389.7 5035.18
Ku
jan
ga
A. Kharif 13525 0 34 2 6 2169 15736 13485 3198 21000 41092 3567 23000 54576.66 3468.27
B. Rabi 317 0 8049 3293 0 3013 14672 35827 3193.99 22000 11712 3390 24000 47539 3240.12
Summer 0 0 0 0 0 753 753 0 0 0 8961 11900 24000 8961 11900.4
Horticultural & Plantation
0
Total 13842 0 8083 3295 6 5935 31161 49312 3195 61765 3927 111076.7 3564.61
District Irrigation Plan (DIP), Jagatsinghpur Page 35
Name of the Block
Season
Crop Sown Rainfed Irrigated Total
Cereals
coarse
cereals
pulses
oilseeds
fibre crop
s
Any other crops
Area(ha)
Producttion(Ton/yr
)
Productiv ity or
Yield(kg/ha)
Cost of Cultivat
on (Rs./ha)
Product! on (Ton /yr)
Productivity (Kgs/h
a)
Cost of Cultivation (Rs./ha)
Product! on (Ton
/yr)
Productivity (Kgs/ha)
Cost of Cultivat
ion (Rs./ha)
Era
sa
ma
A. Kharif 15506 0 29 1 8 2085 17629 46283 3408 21000 14791 3652 23000 61074.25 3464.42
B. Rabi 777 0 8404 566 0 3862 13609 34351 3937.53 22000 20058 4106 24000 54409 3998.02
Summer 0 0 0 0 0 966 966 0 0 0 11689 12100 24000 11689 12100.4
Horticultural & Plantation
0
Total 16283 0 8433 567 8 6913 32204 80634 3615 46538 4700 127172.3 3948.96
Dis
tric
t T
ota
l
A. Kharif 86584 0 148 10 67 1754
6 10435
5 11768
9 3871 21000
359473
4861 23000 477162.1 4572.49
B. Rabi 1388 0 5206
1 1005
7 0
28780
92286 28038
8 4335 22000
127002
4601 24000 407390 4414.43
Summer 0 0 0 0 0 7193 7193 0 0 0 86114 11972 24000 86114 11971.9
Horticultural & Plantation
0
Total 87972 0 87972 10067 67 53519 20383
4 39807
7 4186 572589
5265.43
970666.1 4762.04
District Irrigation Plan (DIP), Jagatsinghpur Page 36
2.3 Irrigation based Classification
Name of the State: Odisha
Name of the District : Jagatsinghpur
Sl No
Name of the Block
Irrigated (Area in ha) Rainfed (Area in ha)
Gross Irrigated Area Net Irrigated Area Partially Irrigated /
Protective Irrigation Un-Irrigated or Totally
Rainfed
1 Jagatsinghpur 18727 13528 0 883
2 Raghunathpur 10181 7345 0 597
3 Balikuda 18511 12906 0 3197
4 Biridi 10797 7558 0 650
5 Naugaon 6161 3634 0 5441
6 Tirtol 18739 13408 0 1818
7 Kujanga 15728 11520 0 4044
8 Erasama 9907 4056 0 13750
Total 108751 73955 0 30380
District Irrigation Plan (DIP), Jagatsinghpur Page 37
C H A P T E R- III
Water Availability
3.1 Status of Water Availability
Out of the total cropped area of 104335 ha, 73955 ha and 34706 ha area is covered under
irrigation during kharif and rabi season, respectively. Irrigation water was assessed as 1.53
BCM (1.30 in kharif and 0.23 in rabi). The block wise detail of this estimate of water
availability through irrigation infrastructure created is given below in Table 3.1. While 71028
ha (61793 in kharif and 9235 in rabi) is being irrigated from surface irrigation sources
amounting to 1.0871 BCM on volumetric basis. Similarly 37723 ha is being irrigated from
groundwater sources amounting to 0.3741 BCM on volumetric basis. In total 1.4598 BCM of
water is being used for irrigation in both kharif and rabi season.
As regards to availability of surface water for development of Lift Irrigation sector, the
available discharge of three rivers namely Mahanandi, Paika & Devi can be utilised.
Moreover, the surplus discharge of drainage channel, Hansua can also be utilised for
irrigation through Lift Irrigation system. Even in patches of the dead river Alaka Lift Irrigation
system can also be developed.
3.2 Status of Ground Water Availability
Gross annual groundwater recharge is estimated to be 48683 HM. Natural losses is 3654
HM. So, net available groundwater resources is 45029 HM. Ground water draft in different
sectors as per Central Ground Water Board (CGWB) all the blocks are in safe limits of
ground water utilization. The stage of ground water development is 47.37%. Off the 8 blocks
in the district, 3 blocks namely Balikuda, Kujanga & Naugaon are stated to be partially saline
& Erasama block is found to be fully saline. The state of ground water development in
Kujanga & Naugaon block is 62.38% & 67.26%, respectively. As such, considerations of
further draft in these two blocks need to be carefully handled.
3.3. Status of Command Area
The command area development and participatory irrigation management taken up in the
state under the centrally sponsored plan scheme has not been extended to the total
command area of the major irrigation System (Machhagaon and Taladanda Canal system)
and also to the command area of the projects of LIP. The details status of command area
developed is presented below in Table 3.3.
3.4 Existing Type of Irrigation
The details status of existing type of irrigation is presented below in Table 3.4.
District Irrigation Plan (DIP), Jagatsinghpur Page 38
Table 3.1 (A) Status of Water Availability (Source: District Irrigation and
agriculture office)
BCM
S.No. Sources Kharif Rabi Summer Total
1 Surface Irrigation 0
(i) Canal(Major & Medium Irrigation) 0.985182 0 0 0.98518
(ii) Minor Irrigation tanks 0 0 0 0
(iii) Lift Irrigation/Diversion 0.05049 0.0252 0 0.07574
(iv) Various Water Bodies including Rain Water Harvesting
0 0 0 0
(v) Treated Effluent Received from STP 0 0 0 0
(vi) Untreated Effluent 0 0 0 0
(vii) Perennial sources of water 0.0375 0.0038 0 0.04125
Total Surface Irrigation 1.073172 0.029 0 1.10217
2 Groundwater
(i) Open Well 0.0036 0.0009 0 0.0045
(ii) Deep Tube Well 0 0 0 0
(iii) Medium Tube Well 0.061905 0.031 0 0.09286
(iv) Shallow Tube Wells 0.1677 0.1696 0 0.33726
Total Ground Water 0.233205 0.20141 0 0.434618
Grand Total 1.306377 0.2304 0 1.53678
Table 3.1 (B) Status of Water Availability (Source: District Irrigation and agriculture office)
ha
S.No. Sources Kharif Rabi Summer Total
1 Surface Irrigation
(i) Canal(Major & Medium Irrigation) 34770 1717
(ii) Minor Irrigation tanks
(iii) Lift Irrigation/Diversion 4000 2
(iv) Various Water Bodies including Rain Water Harvesting
(v) Treated Effluent Received from STP
(vi) Untreated Effluent
(vii) Perennial sources of water 31742 31720
Total Surface Irrigation 70512 33439 0 0
2 Groundwater
(i) Open Well
(ii) Deep Tube Well
(iii) Medium Tube Well 8383 4502
(iv) Shallow Tube Wells 823
Total Ground Water 9206 4502 0 0
Grand Total 79718 37941 0 0
Table 3.1 (C)
District Irrigation Plan (DIP), Jagatsinghpur Page 39
Block: Jagatsinghpur
BCM
S.No. Sources Kharif Rabi Summ
er Total
1 Surface Irrigation 0
(i) Canal(Major & Medium Irrigation) 0.190707 0 0 0.19071
(ii) Minor Irrigation tanks 0 0 0 0
(iii) Lift Irrigation/Diversion 0 0 0 0
(iv) Various Water Bodies including Rain Water Harvesting
0 0 0 0
(v) Treated Effluent Received from STP 0 0 0 0
(vi) Untreated Effluent 0 0 0 0
(vii) Perennial sources of water 0.0048 0.0003 0 0.00512
Total Surface Irrigation 0.195507 0.0003 0 0.19582
2 Groundwater
(i) Open Well 0.000675 0.00017 0 0.00085
(ii) Deep Tube Well 0 0 0 0
(iii) Medium Tube Well 0.00528 0.00264 0 0.00792
(iv) Shallow Tube Wells 0.024765 0.0324 0 0.05717
Total Ground Water 0.03072 0.03521 0 0.065933
Grand Total 0.226227 0.03553 0 0.261755
Raghunathpur
BCM
S.No. Sources Kharif Rabi Summer Total
1 Surface Irrigation 0
(i) Canal(Major & Medium Irrigation) 0.110484 0 0 0.11048
(ii) Minor Irrigation tanks 0 0 0 0
(iii) Lift Irrigation/Diversion 0.0015 0.00075 0 0.00225
(iv) Various Water Bodies including Rain Water Harvesting
0 0 0 0
(v) Treated Effluent Received from STP 0 0 0 0
(vi) Untreated Effluent 0 0 0 0
(vii) Perennial sources of water 0.00042 9E-05 0 0.00051
Total Surface Irrigation 0.112404 0.0008 0 0.11324
2 Groundwater
(i) Open Well 0.000525 0.00014 0 0.00066
(ii) Deep Tube Well 0 0 0 0
(iii) Medium Tube Well 0.092745 0.0314 0 0.12417
(iv) Shallow Tube Wells 0.01248 0.00624 0 0.01872
Total Ground Water 0.10575 0.0378 0 0.14355
Grand Total 0.218154 0.03864 0 0.256794
District Irrigation Plan (DIP), Jagatsinghpur Page 40
Balikuda
BCM
S.No. Sources Kharif Rabi Summer Total
1 Surface Irrigation 0
(i) Canal(Major & Medium Irrigation) 0.169488 0 0 0.16949
(ii) Minor Irrigation tanks 0 0 0 0
(iii) Lift Irrigation/Diversion 0.00456 0.00228 0 0.00684
(iv) Various Water Bodies including Rain Water Harvesting
0 0 0 0
(v) Treated Effluent Received from STP 0 0 0 0
(vi) Untreated Effluent 0 0 0 0
(vii) Perennial sources of water 0.00522 0.00068 0 0.0059
Total Surface Irrigation 0.179268 0.003 0 0.18222
2 Groundwater
(i) Open Well 0.000075 1.5E-05 0 0.00009
(ii) Deep Tube Well 0 0 0 0
(iii) Medium Tube Well 0.00282 0.00141 0 0.00423
(iv) Shallow Tube Wells 0.03468 0.02939 0 0.06407
Total Ground Water 0.037575 0.03081 0 0.068385
Grand Total 0.216843 0.03377 0 0.250608
Biridi
BCM
S.No. Sources Kharif Rabi Summer Total
1 Surface Irrigation 0
(i) Canal(Major & Medium Irrigation) 0.107283 0 0 0.10728
(ii) Minor Irrigation tanks 0 0 0 0
(iii) Lift Irrigation/Diversion 0.00024 0.00012 0 0.00036
(iv) Various Water Bodies including Rain Water Harvesting
0 0 0 0
(v) Treated Effluent Received from STP 0 0 0 0
(vi) Untreated Effluent 0 0 0 0
(vii) Perennial sources of water 0.003735 0.00011 0 0.00384
Total Surface Irrigation 0.111258 0.0002 0 0.11148
2 Groundwater
(i) Open Well 0.00015 3.8E-05 0 0.00019
(ii) Deep Tube Well 0 0 0 0
(iii) Medium Tube Well 0.00996 0.00498 0 0.01494
(iv) Shallow Tube Wells 0.012045 0.01946 0 0.03151
Total Ground Water 0.022155 0.02448 0 0.046635
Grand Total 0.133413 0.02471 0 0.158118
District Irrigation Plan (DIP), Jagatsinghpur Page 41
Nuagaon
BCM
S.No. Sources Kharif Rabi Summer Total
1 Surface Irrigation 0
(i) Canal(Major & Medium Irrigation) 0.020064 0 0 0.02006
(ii) Minor Irrigation tanks 0 0 0 0
(iii) Lift Irrigation/Diversion 0.0006 0.0003 0 0.0009
(iv) Various Water Bodies including Rain Water Harvesting
0 0 0 0
(v) Treated Effluent Received from STP 0 0 0 0
(vi) Untreated Effluent 0 0 0 0
(vii) Perennial sources of water 0.00672 0.00006 0 0.00678
Total Surface Irrigation 0.027384 0.0004 0 0.02774
2 Groundwater
(i) Open Well 0.000075 1.5E-05 0 0.00009
(ii) Deep Tube Well 0 0 0 0
(iii) Medium Tube Well 0.012 0.006 0 0.018
(iv) Shallow Tube Wells 0.029415 0.01327 0 0.04268
Total Ground Water 0.04149 0.01928 0 0.060773
Grand Total 0.068874 0.01964 0 0.088517
Tirtol
BCM
S.No. Sources Kharif Rabi Summer Total
1 Surface Irrigation 0
(i) Canal(Major & Medium Irrigation) 0.194123 0 0 0.19412
(ii) Minor Irrigation tanks 0 0 0 0
(iii) Lift Irrigation/Diversion 0.0156 0.0078 0 0.0234
(iv) Various Water Bodies including Rain Water Harvesting
0 0 0 0
(v) Treated Effluent Received from STP 0 0 0 0
(vi) Untreated Effluent 0 0 0 0
(vii) Perennial sources of water 0.00477 0.00092 0 0.00569
Total Surface Irrigation 0.214493 0.0087 0 0.22322
2 Groundwater
(i) Open Well 0.00075 0.00019 0 0.00094
(ii) Deep Tube Well 0 0 0 0
(iii) Medium Tube Well 0.01809 0.00905 0 0.02714
(iv) Shallow Tube Wells 0.01461 0.01469 0 0.0293
Total Ground Water 0.03345 0.02392 0 0.057368
Grand Total 0.2479425 0.03264 0 0.280583
District Irrigation Plan (DIP), Jagatsinghpur Page 42
Kujanga
BCM
S.No. Sources Kharif Rabi Summer Total
1 Surface Irrigation 0
(i) Canal(Major & Medium Irrigation) 0.156387 0 0 0.15639
(ii) Minor Irrigation tanks 0 0 0 0
(iii) Lift Irrigation/Diversion 0.01155 0.00578 0 0.01733
(iv) Various Water Bodies including Rain Water Harvesting
0 0 0 0
(v) Treated Effluent Received from STP 0 0 0 0
(vi) Untreated Effluent 0 0 0 0
(vii) Perennial sources of water 0.00285 0.00102 0 0.00387
Total Surface Irrigation 0.170787 0.0068 0 0.17758
2 Groundwater
(i) Open Well 0.0003 7.5E-05 0 0.00038
(ii) Deep Tube Well 0 0 0 0
(iii) Medium Tube Well 0.0009 0.00045 0 0.00135
(iv) Shallow Tube Wells 0.026715 0.01287 0 0.03959
Total Ground Water 0.027915 0.0134 0 0.04131
Grand Total 0.198702 0.02019 0 0.218892
Erasama
BCM
S.No. Sources Kharif Rabi Summer Total
1 Surface Irrigation 0
(i) Canal(Major & Medium Irrigation) 0.036647 0 0 0.03665
(ii) Minor Irrigation tanks 0 0 0 0
(iii) Lift Irrigation/Diversion 0.01644 0.00822 0 0.02466
(iv) Various Water Bodies including Rain Water Harvesting
0 0 0 0
(v) Treated Effluent Received from STP 0 0 0 0
(vi) Untreated Effluent 0 0 0 0
(vii) Perennial sources of water 0.00897 0.00051 0 0.00948
Total Surface Irrigation 0.062057 0.0087 0 0.07079
2 Groundwater
(i) Open Well 0.00105 0.00026 0 0.00131
(ii) Deep Tube Well 0 0 0 0
(iii) Medium Tube Well 0.000705 0.00035 0 0.00106
(iv) Shallow Tube Wells 0.018765 0.03311 0 0.05188
Total Ground Water 0.02052 0.03373 0 0.054248
Grand Total 0.0825765 0.04246 0 0.125034
District Irrigation Plan (DIP), Jagatsinghpur Page 43
Table 3.2 Status of Ground Water Availability
Name of the Block
Status of Block as per Central Ground Water Board Notification
Ground Water (BCM)
Critical Semi-
Critical Safe Draft Recharge Gap
Jagatsinghpur No No Safe 0.0395 0.0822 0
.0427
Raghunathpur No No Safe 0.0272 0.0734 0
.0462
Balikuda No No Safe 0.0254 0.0505 0
.0251
Biridi No No Safe 0.0345 0.0681 0
.0336
Naugaon No No Safe 0.0188 0.0279 0
.0091
Tirtol No No Safe 0.0466 0.0841 0
.0375
Kujanga No No Safe 0.0401 0.0641 0
.0240
Erasama No No Safe 0 0 0
Table 3.3. Status of Command Area
Name of the Block
No of
G.P
No of the
Village
Information of Canal Command
Information on the other Services
Command Total Area
To
tal A
rea
Develo
ped
Are
a
Un
develo
pe
d A
rea
To
tal A
rea
Develo
ped
Are
a
Un
develo
pe
d A
rea
Develo
ped
Co
mm
an
d
Un
develo
pe
d C
om
man
d
2 3 4 5 6 7 8 9 10 6+9 7+10
Jagatsinghpur 29 186 11558 9246 2312 1970 950 1020 10196 3332
Raghunathpur 19 87 6696 5357 1339 649 350 299 5707 1638
Balikuda 30 237 10272 8218 2054 2634 1280 1354 9498 3408
Biridi 21 81 6502 5202 1300 1056 495 561 5697 1861
Naugaon 16 90 1216 973 243 2418 580 1838 1553 2081
Tirtol 27 249 11765 9412 2353 1643 450 1193 9862 3546
Kujanga 27 181 9478 7582 1896 2042 550 1492 8132 3388
Erasama 25 210 2221 1777 444 1835 450 1385 2227 1829
District Irrigation Plan (DIP), Jagatsinghpur Page 44
Table 3.4 Existing Type of Irrigation
Name of the Block
So
urc
e o
f ir
rig
ati
on
Surface Irrigation(1)
Ground Water(2) other
source includin
g tradition
al WHS(3)
Water extraction devices/Lift
Total
canal based Tube well Electricity
pump (4)
Diesel pump
(5)
Irrigation
sources (1+2+3)
water extract
ing units
(4+5+6)
Govt. Canal Govt. Pvt. Pvt.
Jagatsinghpur
No 1 Main Canal & Distriburaty
30 1651 110 1230 246 1476
Comand area (ha)
11558 352 1651 45 215 13821 0
Raghunathpur
No 2 Main Canal & Distriburaty
62 447 76 375 75 450
Comand area (ha)
6696 792 447 35 19 7989 0
Balikuda
No 2 Main Canal & Distriburaty
31 2312 12 1575 315 1890
Comand area (ha)
10272 492 2312 5 234 13315 0
Biridi
No 2 Main Canal & Distriburaty
45 803 25 655 131 786
Comand area (ha)
6502 680 803 10 167 8162 0
Naugaon
No 1 Main Canal & Distriburaty
77 1961 12 1579 316 1894.8
Comand area (ha)
1216 820 1961 5 301 4303 0
Tirtol
No 3 Main Canal & Distriburaty
204 974 125 975 195 1170
Comand area (ha)
11765 2330 974 50 214 15333 0
Kujanga
No 2 Main Canal & Distriburaty
9 1781 50 1448 290 1737.6
Comand area (ha)
9478 830 1781 20 128 12237 0
Erasama
No 1 Main Canal & Distriburaty
3 1251 175 952 190 1142.4
Comand area (ha)
2221 1121 1251 70 402 5065 0
District Irrigation Plan (DIP), Jagatsinghpur Page 45
CHAPTER IV
WATER REQUIREMENT / DEMAND
It is necessary to estimate the water demand from all sources (domestic, livestock, irrigation and industry) for comparison with the potential of available resources both from surface and groundwater resources to arrive at a good irrigation plan. The domestic, livestock, irrigation and industrial requirement of the district is estimated as detailed in the following sections. 4.1 Domestic Water Demand From the population figures of 2011 census the present population (2015) and projected population for 2020 was estimated considering the prevailing growth rate. The domestic water demand was then estimated considering 120 liters and 80 liters of consumption per person per day basis for urban and rural population respectively. A demand of 0.0352 BCM and 0.0364 BCM of water was estimated as the domestic demand during 2015 and 2020, respectively. The details block wise estimation of domestic water demand is presented below in Table no.4.1.
Table 4.1 Water demand
Sl No
Name of the Blocks
Population in 2011
Projected population in
2015
Projected population
in 2020
Gross Water Demand
(BCM) 2015
Gross Water Demand (BCM)
2020
1 Jagatsinghpur 141967 147314 152661 0.0043016 0.004457701
2 Raghunathpur 83646 86796.5 89947 0.0025345 0.002626452
3 Balikuda 165275 171500 177725 0.0050078 0.00518957
4 Biridi 82795 85913 89031 0.0025087 0.002599705
5 Naugaon 77634 80373 83112 0.0023469 0.00242687
6 Tirtol 161100 167167.5 173235 0.0048813 0.005058462
7 Kujanga 176065 182696.5 189328 0.0053347 0.005528378
8 Erasama 146273 151782 157291 0.004432 0.004592897
9 Jagatsinghpur (M) 33631 34897.5 36164 0.0012738 0.001319986
10 Paradeep(M) 68585 71168 73751 0.0025976 0.002691912
TOTAL 1136971 1179608 1222245 0.03521883 0.036491934
District Irrigation Plan (DIP), Jagatsinghpur Page 46
4.2 Crop Water Demand
The block wise and crop wise area sown and the corresponding area under irrigation are given below in Table 4.2. The volumetric water demand is estimated by multiplying the crop water requirement for the particular crop to arrive the total crop water demand. The crop water demand for the district is calculated as 0.746 BCM. Besides the water potential required, existing water potential and water potential to be created is calculated as 1.1194, 0.260 and 0.858 respectively.
Table 4.2 Crop Water demand
Crops
Area sown (ha)
Kharif
Crop water demand (kharif) (BCM)
Area sown (ha) Rabi
Crop water demand
(Rabi)(BCM)
Area sown (ha)
Irrigated area (ha)
Total Crop water
demand (mm)
Water potential required (BCM)
PADDY 86534 0.951874 1260 0.01386 87794 1260 0.965734 1.448601
MAIZE 45 0.00027 118 0.000708 163 118 0.000978 0.001467
Ragi ( Dry ) 5 0.00002 0 5 0 0.00002 0.00003
Bajra ( Local ) 0 0 0 0 0 0 0
Small Millets 0 0 0 0 0 0 0
Jower 0 0 0 0 0 0 0
Wheat 0 0 10 0.00004 10 10 0.00004 0.00006
Total Cereals 86584 0.952164 1388 0.014608 87972 1388 0.966772 1.450158
MUNG 0 0 38162 0.133567 38162 0 0.133567 0.2003505
BIRI 102 0.000612 14954 0.089724 15056 0 0.090336 0.135504
Cowpea 31 0.0001085 348 0.001218 379 348 0.0013265 0.00198975
Arhar 15 0.00009 0 0 15 0 0.00009 0.000135
Horsegram 0 2022 0.007077 2022 0 0.007077 0.0106155
Gram 0 50 0.000175 50 0 0.000175 0.0002625
Fieldpea 0 125 0.0005 125 125 0.0005 0.00075
Lentil 0 0 0 0 0 0 0
Total Pulses 148 0.0008105 55661 0.232261 55809 473 0.2330715 0.34960725
Groundnut 0 8498 0.04249 8498 90 0.04249 0.063735
Til 5 0.000025 138 0.00069 143 0 0.000715 0.0010725
Caster 5 0.000025 0 5 0 0.000025 0.0000375
Sunflower 0 472 0.001888 472 472 0.001888 0.002832
Mustard 0 949 0.003796 949 0 0.003796 0.005694
Nizer 0 0 0 0 0 0
Linseed 0 0 0 0 0 0
Total Oil Seed 10 0.00005 10057 0.048864 10067 562 0.048914 0.073371
Potato 0 2102 0.012612 2102 2102 0.012612 0.018918
Onion 0 886 0.005316 886 886 0.005316 0.007974
Other Vegetables 14871 0.104097 25438 0.178066 40309 25438 0.282163 0.4232445
Total Vegetable 14871 0.104097 28426 0.195994 43297 28426 0.300091 0.4501365
Chili 1160 0.00812 2200 0.0154 3360 2200 0.02352 0.03528
TURMERIC 322 0.001932 0 322 0 0.001932 0.002898
Corriender 0 0 551 0.002755 551 551 0.002755 0.0041325
Zinger 403 0.002418 0 403 0 0.002418 0.003627
Garlic 0 400 0.0024 400 400 0.0024 0.0036
Total Spices 1885 0.01247 3151 0.020555 5036 3151 0.033025 0.0495375
Fiber 67 0.000402 0 67 0.000402 0.000603
Sugarcane 790 0.01659 796 0.016716 1586 796 0.033306 0.049959
District Irrigation Plan (DIP), Jagatsinghpur Page 47
Block: Jagatsinghpur
Crops
Area sown (ha)
Kharif
Crop water demand
(kharif)(BCM)
Area sown (ha) Rabi
Crop water demand
(Rabi)(BCM)
Area sown (ha)
Irrigated area (ha)
Total Crop water
demand (mm)
Water potential required (BCM)
PADDY 11230 0.12353 20 0.00022 11250 20 0.12375 0.185625
MAIZE 5 0.00003 14 0.000084 19 14 0.000114 0.000171
Ragi ( Dry ) 1 0.000004 0 0 1 0 0.000004 0.000006
Bajra ( Local ) 0 0 0 0 0 0 0
Small Millets 0 0 0 0 0 0 0
Jower 0 0 0 0 0 0 0
Wheat 0 0 0 0 0 0 0 0
Total Cereals 11236 0.123564 34 0.000304 11270 34 0.123868 0.185802
MUNG 0 0 6231 0.0218085 6231 0 0.0218085 0.03271275
BIRI 7 0.000042 2290 0.01374 2297 0 0.013782 0.020673
Cowpea 10 0.000035 25 0.0000875 35 25 0.0001225 0.00018375
Arhar 3 0.000018 0 0 3 0 0.000018 0.000027
Horsegram 0 69 0.0002415 69 0 0.0002415 0.00036225
Gram 0 7 0.0000245 7 0 0.0000245 0.00003675
Fieldpea 0 8 0.000032 8 8 0.000032 0.000048
Lentil 0 0 0 0 0 0 0
Total Pulses 20 0.000095 8630 0.035934 8650 33 0.036029 0.0540435
Groundnut 0 690 0.00345 690 8 0.00345 0.005175
Til 0 0 5 0.000025 5 0 0.000025 0.0000375
Caster 1 0.000005 0 1 0 0.000005 0.0000075
Sunflower 0 47 0.000188 47 47 0.000188 0.000282
Mustard 0 50 0.0002 50 0 0.0002 0.0003
Nizer 0 0 0 0 0 0
Linseed 0 0 0 0 0 0
Total Oil Seed 1 0.000005 792 0.003863 793 55 0.003868 0.005802
Potato 0 585 0.00351 585 585 0.00351 0.005265
Onion 0 113 0.000678 113 113 0.000678 0.001017
Other Vegetables
2801 0.019607 4154 0.029078 6955 4154 0.048685 0.0730275
Total Vegetable 2801 0.019607 4852 0.033266 7653 4852 0.052873 0.0793095
Chili 175 0.001225 115 0.000805 290 115 0.00203 0.003045
TURMERIC 44 0.000264 0 44 0 0.000264 0.000396
Corriender 0 0 31 0.000155 31 31 0.000155 0.0002325
Zinger 50 0.0003 0 50 0 0.0003 0.00045
Garlic 0 40 0.00024 40 40 0.00024 0.00036
Total Spices 269 0.001789 186 0.0012 455 186 0.002989 0.0044835
Fiber 10 0.00006 0 10 0.00006 0.00009
Sugarcane 58 0.001218 39 0.000819 97 39 0.002037 0.0030555
Total
District Irrigation Plan (DIP), Jagatsinghpur Page 48
Block: Raghunathpur
Crops
Area sown (ha)
Kharif
Crop water demand
(kharif)(BCM)
Area sown (ha) Rabi
Crop water demand
(Rabi)(BCM)
Area sown (ha)
Irrigated area (ha)
Total Crop water
demand (mm)
Water potential required (BCM)
PADDY 6930 0.07623 60 0.00066 6990 60 0.07689 0.115335
MAIZE 4 0.000024 15 0.00009 19 15 0.000114 0.000171
Ragi ( Dry ) 1 0.000004 0 1 0 0.000004 0.000006
Bajra ( Local ) 0 0 0 0 0 0 0
Small Millets 0 0 0 0 0 0 0
Jower 0 0 0 0 0 0 0
Wheat 0 0 0 0 0 0 0 0
Total Cereals 6935 0.076258 75 0.00075 7010 75 0.077008 0.115512
MUNG 0 0 3117 0.0109095 3117 0 0.0109095 0.01636425
BIRI 8 0.000048 1570 0.00942 1578 0 0.009468 0.014202
Cowpea 2 0.000007 25 0.0000875 27 25 0.0000945 0.00014175
Arhar 1 0.000006 0 0 1 0 0.000006 0.000009
Horsegram 0 130 0.000455 130 0 0.000455 0.0006825
Gram 0 5 0.0000175 5 0 0.0000175 0.00002625
Fieldpea 0 8 0.000032 8 8 0.000032 0.000048
Lentil 0 0 0 0 0 0 0
Total Pulses 11 0.000061 4855 0.0209215 4866 33 0.0209825 0.03147375
Groundnut 0 284 0.001704 284 2 0.001704 0.002556
Til 1 0.000005 5 0.000025 6 0 0.00003 0.000045
Caster 0 0 0 0 0 0 0
Sunflower 0 44 0.000176 44 44 0.000176 0.000264
Mustard 0 50 0.0002 50 0 0.0002 0.0003
Nizer 0 0 0 0 0 0
Linseed 0 0 0 0 0 0
Total Oil Seed 1 0.000005 383 0.002105 384 46 0.00211 0.003165
Potato 0 185 0.00148 185 185 0.00148 0.00222
Onion 0 163 0.001304 163 163 0.001304 0.001956
Other Vegetables
597 0.004179 1724 0.013792 2321 1724 0.017971 0.0269565
Total Vegetable 597 0.004179 2072 0.016576 2669 2072 0.020755 0.0311325
Chili 77 0.000539 220 0.00154 297 220 0.002079 0.0031185
TURMERIC 15 0.00009 0 15 0 0.00009 0.000135
Corriender 0 0 70 0.00035 70 70 0.00035 0.000525
Zinger 41 0.000246 0 0 41 0 0.000246 0.000369
Garlic 0 10 0.00006 10 10 0.00006 0.00009
Total Spices 133 0.000875 300 0.00195 433 300 0.002825 0.0042375
Fiber 10 0.00006 0 10 0.00006 0.00009
Sugarcane 309 0.006489 310 0.00651 619 310 0.012999 0.0194985
Total
District Irrigation Plan (DIP), Jagatsinghpur Page 49
Block: Balikuda
Crops
Area sown (ha)
Kharif
Crop water demand
(kharif)(BCM)
Area sown (ha) Rabi
Crop water demand
(Rabi)(BCM)
Area sown (ha)
Irrigated area (ha)
Total Crop water
demand (mm)
Water potential required (BCM)
PADDY 13340 0.14674 20 0.00022 13360 20 0.14696 0.22044
MAIZE 7 0.000042 15 0.00009 22 15 0.000132 0.000198
Ragi ( Dry ) 1 0.000004 0 1 0 0.000004 0.000006
Bajra ( Local ) 0 0 0 0 0 0 0
Small Millets 0 0 0 0 0 0 0
Jower 0 0 0 0 0 0 0
Wheat 0 0 0 0 0 0 0 0
Total Cereals 13348 0.146786 35 0.00031 13383 35 0.147096 0.220644
MUNG 0 0 8277 0.0289695 8277 0 0.0289695 0.04345425
BIRI 12 0.000072 771 0.004626 783 0 0.004698 0.007047
Cowpea 3 0.0000105 20 0.00007 23 20 0.0000805 0.00012075
Arhar 2 0.000012 0 0 2 0 0.000012 0.000018
Horsegram 0 470 0.001645 470 0 0.001645 0.0024675
Gram 0 7 0.0000245 7 0 0.0000245 0.00003675
Fieldpea 0 16 0.000064 16 16 0.000064 0.000096
Lentil 0 0 0 0 0 0 0
Total Pulses 17 0.0000945 9561 0.035399 9578 36 0.0354935 0.05324025
Groundnut 0 280 0.0014 280 2 0.0014 0.0021
Til 1 0.000005 50 0.00025 51 0 0.000255 0.0003825
Caster 0 0 0 0 0 0 0 0
Sunflower 0 106 0.000424 106 106 0.000424 0.000636
Mustard 0 99 0.000396 99 0 0.000396 0.000594
Nizer 0 0 0 0 0 0 0
Linseed 0 0 0 0 0 0 0
Total Oil Seed 1 0.000005 535 0.00247 536 108 0.002475 0.0037125
Potato 0 165 0.00099 165 165 0.00099 0.001485
Onion 0 104 0.000624 104 104 0.000624 0.000936
Other Vegetables
2286 0.016002 4122 0.028854 6408 4122 0.044856 0.067284
Total Vegetable 2286 0.016002 4391 0.030468 6677 4391 0.04647 0.069705
Chili 285 0.001995 845 0.005915 1130 845 0.00791 0.011865
TURMERIC 15 0.00009 0 15 0 0.00009 0.000135
Corriender 0 0 60 0.0003 60 60 0.0003 0.00045
Zinger 50 0.0003 0 50 0 0.0003 0.00045
Garlic 0 80 0.00048 80 80 0.00048 0.00072
Total Spices 350 0.002385 985 0.006695 1335 985 0.00908 0.01362
Fiber 9 0.000054 0 9 0.000054 0.000081
Sugarcane 58 0.001218 50 0.00105 108 50 0.002268 0.003402
Total 16069 0.1665445 15557 0.076392 31626 5605 0.2429365 0.36440475
District Irrigation Plan (DIP), Jagatsinghpur Page 50
Block: Biridi
Crops
Area sown (ha)
Kharif
Crop water
demand (kharif) (BCM)
Area sown (ha) Rabi
Crop water demand
(Rabi)(BCM)
Area sown (ha)
Irrigated area (ha)
Total Crop water
demand (mm)
Water potential required (BCM)
PADDY 6020 0.06622 10 0.00011 6030 10 0.06633 0.099495
MAIZE 5 0.00003 14 0.000084 19 14 0.000114 0.000171
Ragi ( Dry ) 0 0 0 0 0 0 0
Bajra ( Local ) 0 0 0 0 0 0 0
Small Millets 0 0 0 0 0 0 0
Jower 0 0 0 0 0 0 0
Wheat 0 0 2 0.000008 2 2 0.000008 0.000012
Total Cereals 6025 0.06625 26 0.000202 6051 26 0.066452 0.099678
MUNG 0 0 2751 0.0096285 2751 0 0.0096285 0.01444275
BIRI 5 0.00003 1071 0.006426 1076 0 0.006456 0.009684
Cowpea 2 0.000007 48 0.000168 50 48 0.000175 0.0002625
Arhar 2 0.000012 0 0 2 0 0.000012 0.000018
Horsegram 0 550 0.001925 550 0 0.001925 0.0028875
Gram 0 7 0.0000245 7 0 0.0000245 0.00003675
Fieldpea 0 17 0.000068 17 17 0.000068 0.000102
Lentil 0 0 0 0 0 0 0
Total Pulses 9 0.000049 4444 0.01824 4453 65 0.018289 0.0274335
Groundnut 0 379 0.001895 379 5 0.001895 0.0028425
Til 1 0.000005 40 0.0002 41 0 0.000205 0.0003075
Caster 1 0.000005 0 0 1 0 0.000005 0.0000075
Sunflower 0 48 0.000192 48 48 0.000192 0.000288
Mustard 0 50 0.0002 50 0 0.0002 0.0003
Nizer 0 0 0 0 0 0 0
Linseed 0 0 0 0 0 0 0
Total Oil Seed 2 0.00001 517 0.002487 519 53 0.002497 0.0037455
Potato 0 265 0.00159 265 265 0.00159 0.002385
Onion 0 164 0.000984 164 164 0.000984 0.001476
Other Vegetables
1655 0.011585 2066 0.014462 3721 2066 0.026047 0.0390705
Total Vegetable 1655 0.011585 2495 0.017036 4150 2495 0.028621 0.0429315
Chili 60 0.00042 230 0.00161 290 230 0.00203 0.003045
TURMERIC 52 0.000312 0 52 0 0.000312 0.000468
Corriender 0 0 50 0.00025 50 50 0.00025 0.000375
Zinger 60 0.00036 0 60 0 0.00036 0.00054
Garlic 0 40 0.00024 40 40 0.00024 0.00036
Total Spices 172 0.001092 320 0.0021 492 320 0.003192 0.004788
Fiber 10 0.00006 0 10 0.00006 0.00009
Sugarcane 268 0.005628 280 0.00588 548 280 0.011508 0.017262
Total 8141 0.0846740 8082 0.045945 16223 3239 0.130619 0.1959285
District Irrigation Plan (DIP), Jagatsinghpur Page 51
Block: Nuagaon
Crops
Area sown (ha)
Kharif
Crop water
demand (kharif) (BCM)
Area sown (ha) Rabi
Crop water demand
(Rabi)(BCM)
Area sown (ha)
Irrigated area (ha)
Total Crop water
demand (mm)
Water potential required (BCM)
PADDY 7110 0.07821 80 0.00088 7190 80 0.07909 0.118635
MAIZE 4 0.000024 15 0.00009 19 15 0.000114 0.000171
Ragi ( Dry ) 0 0 0 0 0 0 0
Bajra ( Local ) 0 0 0 0 0 0 0
Small Millets 0 0 0 0 0 0 0
Jower 0 0 0 0 0 0 0
Wheat 0 0 2 0.000008 2 2 0.000008 0.000012
Total Cereals 7114 0.078234 97 0.000978 7211 97 0.079212 0.118818
MUNG 0 0 1567 0.0054845 1567 0 0.0054845 0.00822675
BIRI 5 0.00003 1500 0.009 1505 0 0.00903 0.013545
Cowpea 2 0.000007 30 0.000105 32 30 0.000112 0.000168
Arhar 1 0.000006 0 0 1 0 0.000006 0.000009
Horsegram 0 140 0.00049 140 0 0.00049 0.000735
Gram 0 5 0.0000175 5 0 0.0000175 0.00002625
Fieldpea 0 13 0.000052 13 13 0.000052 0.000078
Lentil 0 0 0 0 0 0 0
Total Pulses 8 0.000043 3255 0.015149 3263 43 0.015192 0.022788
Groundnut 0 2595 0.012975 2595 28 0.012975 0.0194625
Til 0 0 5 0.000025 5 0 0.000025 0.0000375
Caster 0 0 0 0 0 0 0
Sunflower 0 67 0.000268 67 67 0.000268 0.000402
Mustard 0 70 0.00028 70 0 0.00028 0.00042
Nizer 0 0 0 0 0 0
Linseed 0 0 0 0 0 0
Total Oil Seed 0 0 2737 0.013548 2737 95 0.013548 0.020322
Potato 0 185 0.00111 185 185 0.00111 0.001665
Onion 0 165 0.00099 165 165 0.00099 0.001485
Other Vegetables
1580 0.01106 1558 0.010906 3138 1558 0.021966 0.032949
Total Vegetable 1580 0.01106 1908 0.013006 3488 1908 0.024066 0.036099
Chili 200 0.0014 175 0.001225 375 175 0.002625 0.0039375
TURMERIC 45 0.00027 0 45 0 0.00027 0.000405
Corriender 0 0 90 0.00045 90 90 0.00045 0.000675
Zinger 60 0.00036 0 60 0 0.00036 0.00054
Garlic 0 90 0.00054 90 90 0.00054 0.00081
Total Spices 305 0.00203 355 0.002215 660 355 0.004245 0.0063675
Fiber 9 0.000054 0 9 0.000054 0.000081
Sugarcane 39 0.000819 29 0.000609 68 29 0.001428 0.002142
District Irrigation Plan (DIP), Jagatsinghpur Page 52
Block: Tirtol
Crops
Area sown (ha)
Kharif
Crop water
demand (kharif) (BCM)
Area sown (ha) Rabi
Crop water demand
(Rabi)(BCM)
Area sown (ha)
Irrigated area (ha)
Total Crop water
demand (mm)
Water potential required (BCM)
PADDY 12890 0.14179 10 0.00011 12900 10 0.1419 0.21285
MAIZE 5 0.00003 15 0.00009 20 15 0.00012 0.00018
Ragi ( Dry ) 0 0 0 0 0 0 0
Bajra ( Local ) 0 0 0 0 0 0 0
Small Millets 0 0 0 0 0 0 0
Jower 0 0 0 0 0 0 0
Wheat 0 0 2 0.000008 2 2 0.000008 0.000012
Total Cereals 12895 0.14182 27 0.000208 12922 27 0.142028 0.213042
MUNG 0 0 4602 0.016107 4602 0 0.016107 0.0241605
BIRI 15 0.00009 3521 0.021126 3536 0 0.021216 0.031824
Cowpea 3 0.0000105 25 0.0000875 28 25 0.000098 0.000147
Arhar 2 0.000012 0 0 2 0 0.000012 0.000018
Horsegram 0 299 0.0010465 299 0 0.0010465 0.00156975
Gram 0 7 0.0000245 7 0 0.0000245 0.00003675
Fieldpea 0 9 0.000036 9 9 0.000036 0.000054
Lentil 0 0 0 0 0 0 0
Total Pulses 20 0.0001125 8463 0.0384275 8483 34 0.03854 0.05781
Groundnut 0 890 0.00445 890 8 0.00445 0.006675
Til 1 0.000005 9 0.000045 10 0 0.00005 0.000075
Caster 1 0.000005 0 1 0 0.000005 0.0000075
Sunflower 0 55 0.00022 55 55 0.00022 0.00033
Mustard 0 280 0.00112 280 0 0.00112 0.00168
Nizer 0 0 0 0 0 0
Linseed 0 0 0 0 0 0
Total Oil Seed 2 0.00001 1234 0.005835 1236 63 0.005845 0.0087675
Potato 0 425 0.00255 425 425 0.00255 0.003825
Onion 0 111 0.000666 111 111 0.000666 0.000999
Other Vegetables
2011 0.014077 4213 0.029491 6224 4213 0.043568 0.065352
Total Vegetable 2011 0.014077 4749 0.032707 6760 4749 0.046784 0.070176
Chili 198 0.001386 260 0.00182 458 260 0.003206 0.004809
TURMERIC 77 0.000462 0 77 0 0.000462 0.000693
Corriender 0 0 60 0.0003 60 60 0.0003 0.00045
Zinger 68 0.000408 0 68 0 0.000408 0.000612
Garlic 0 50 0.0003 50 50 0.0003 0.00045
Total Spices 343 0.002256 370 0.00242 713 370 0.004676 0.007014
Fiber 5 0.00003 0 5 0.00003 0.000045
Sugarcane 58 0.001218 88 0.001848 146 88 0.003066 0.004599
District Irrigation Plan (DIP), Jagatsinghpur Page 53
Block: Kujanga
Crops
Area sown (ha)
Kharif
Crop water
demand (kharif) (BCM)
Area sown (ha) Rabi
Crop water demand
(Rabi)(BCM)
Area sown (ha)
Irrigated area (ha)
Total Crop water
demand (mm)
Water potential required (BCM)
PADDY 13514 0.148654 300 0.0033 13814 300 0.151954 0.227931
MAIZE 10 0.00006 15 0.00009 25 15 0.00015 0.000225
Ragi ( Dry ) 1 0.000004 0 1 0 0.000004 0.000006
Bajra ( Local ) 0 0 0 0 0 0 0
Small Millets 0 0 0 0 0 0 0
Jower 0 0 0 0 0 0 0
Wheat 0 0 2 0.000008 2 2 0.000008 0.000012
Total Cereals 13525 0.148718 317 0.003398 13842 317 0.152116 0.228174
MUNG 0 0 6686 0.023401 6686 0 0.023401 0.0351015
BIRI 28 0.000168 1255 0.00753 1283 0 0.007698 0.011547
Cowpea 4 0.000014 35 0.0001225 39 35 0.0001365 0.00020475
Arhar 2 0.000012 0 0 2 0 0.000012 0.000018
Horsegram 0 59 0.0002065 59 0 0.0002065 0.00030975
Gram 0 6 0.000021 6 0 0.000021 0.0000315
Fieldpea 0 8 0.000032 8 8 0.000032 0.000048
Lentil 0 0 0 0 0 0 0
Total Pulses 34 0.000194 8049 0.031313 8083 43 0.031507 0.0472605
Groundnut 0 2990 0.01495 2990 34 0.01495 0.022425
Til 1 0.000005 5 0.000025 6 0 0.00003 0.000045
Caster 1 0.000005 0 1 0 0.000005 0.0000075
Sunflower 0 48 0.000192 48 48 0.000192 0.000288
Mustard 0 250 0.001 250 0 0.001 0.0015
Nizer 0 0 0 0 0 0
Linseed 0 0 0 0 0 0
Total Oil Seed 2 0.00001 3293 0.016167 3295 82 0.016177 0.0242655
Potato 0 155 0.00093 155 155 0.00093 0.001395
Onion 0 32 0.000192 32 32 0.000192 0.000288
Other Vegetables
2010 0.01407 3229 0.022603 5239 3229 0.036673 0.0550095
Total Vegetable 2010 0.01407 3416 0.023725 5426 3416 0.037795 0.0566925
Chili 80 0.00056 230 0.00161 310 230 0.00217 0.003255
TURMERIC 45 0.00027 0 45 0 0.00027 0.000405
Corriender 0 0 70 0.00035 70 70 0.00035 0.000525
Zinger 34 0.000204 0 34 0 0.000204 0.000306
Garlic 0 50 0.0003 50 50 0.0003 0.00045
Total Spices 159 0.001034 350 0.00226 509 350 0.003294 0.004941
Fiber 6 0.000036 0 6 0.000036 0.000054
Sugarcane 0 0 0 0 0 0 0 0
District Irrigation Plan (DIP), Jagatsinghpur Page 54
Block: Erasama
Crops
Area sown (ha)
Kharif
Crop water
demand (kharif) (BCM)
Area sown (ha) Rabi
Crop water demand
(Rabi)(BCM)
Area sown (ha)
Irrigated area (ha)
Total Crop water
demand (mm)
Water potential required (BCM)
PADDY 15500 0.1705 760 0.00836 16260 760 0.17886 0.26829
MAIZE 5 0.00003 15 0.00009 20 15 0.00012 0.00018
Ragi ( Dry ) 1 0.000004 0 1 0 0.000004 0.000006
Bajra ( Local ) 0 0 0 0 0 0 0
Small Millets 0 0 0 0 0 0 0
Jower 0 0 0 0 0 0 0
Wheat 0 0 2 0.000008 2 2 0.000008 0.000012
Total Cereals 15506 0.170534 777 0.008458 16283 777 0.178992 0.268488
MUNG 0 0 4931 0.0172585 4931 0 0.0172585 0.02588775
BIRI 22 0.000132 2976 0.017856 2998 0 0.017988 0.026982
Cowpea 5 0.0000175 140 0.00049 145 140 0.0005075 0.00076125
Arhar 2 0.000012 0 0 2 0 0.000012 0.000018
Horsegram 0 305 0.0010675 305 0 0.0010675 0.00160125
Gram 0 6 0.000021 6 0 0.000021 0.0000315
Fieldpea 0 46 0.000184 46 46 0.000184 0.000276
Lentil 0 0 0 0 0 0 0
Total Pulses 29 0.0001615 8404 0.036877 8433 186 0.0370385 0.05555775
Groundnut 0 390 0.00195 390 3 0.00195 0.002925
Til 0 0 19 0.000095 19 0 0.000095 0.0001425
Caster 1 0.000005 0 1 0 0.000005 0.0000075
Sunflower 0 57 0.000228 57 57 0.000228 0.000342
Mustard 0 100 0.0004 100 0 0.0004 0.0006
Nizer 0 0 0 0 0 0
Linseed 0 0 0 0 0 0
Total Oil Seed 1 0.000005 566 0.002673 567 60 0.002678 0.004017
Potato 0 137 0.000822 137 137 0.000822 0.001233
Onion 0 34 0.000204 34 34 0.000204 0.000306
Other Vegetables
1931 0.013517 4372 0.030604 6303 4372 0.044121 0.0661815
Total Vegetable 1931 0.013517 4543 0.03163 6474 4543 0.045147 0.0677205
Chili 85 0.000595 125 0.000875 210 125 0.00147 0.002205
TURMERIC 29 0.000174 0 29 0 0.000174 0.000261
Corriender 0 0 120 0.0006 120 120 0.0006 0.0009
Zinger 40 0.00024 0 40 0 0.00024 0.00036
Garlic 0 40 0.00024 40 40 0.00024 0.00036
Total Spices 154 0.001009 285 0.001715 439 285 0.002724 0.004086
Fiber 8 0.000048 0 8 0.000048 0.000072
Sugarcane 0 0 0 0 0 0 0 0
District Irrigation Plan (DIP), Jagatsinghpur Page 55
4.3 Livestock Water Demand
Considering the daily water requirement of individual livestock the total water
requirement for the livestock in various blocks as on 2015 is calculated as 0.00341
BCM. Similarly the projected water demand for the year 2020 will be 0.00410 BCM.
The detailed block wise livestock water demand is presented below in Table 4.3.
Table 4.3 Livestock water demand
Block Total number of
live stock Present water
demand (BCM) Water demand in 2020 (BCM)
Jagatsinghpur 206036 0.000448063 0.00050945
Raghunathpur 127465 0.00022507 0.0002559
Balikuda 102423 0.000591289 0.0006723
Biridi 114085 0.000273156 0.00031058
Naugaon 64082 0.000306868 0.00034891
Tirtol 147210 0.000524967 0.00059689
Kujanga 73057 0.00051547 0.00058609
Erasama 81684 0.000532888 0.00060589
TOTAL 916,042 0.0034 0.0039
4.4 Industrial Water Demand
Present Industrial draft has been collected from the Mahanadi South Irrigation
Division, Cuttack. There are 9 nos of Industry in Paradeep. The present water
demand and projected for 2020 have been reflected against Kujanga block in Table
no. 4.4.
District Irrigation Plan (DIP), Jagatsinghpur Page 56
Table 4.4 Industrial water demand
Sl No
Block No of the industry
Water demand (BCM)
Water demand in 2020 (BCM)
1 Jagatsinghpur 0 0 0
2 Raghunathpur 0 0 0
3 Balikuda 0 0 0
4 Biridi 0 0 0
5 Naugaon 0 0 0
6 Tirtol 0 0 0
7 Kujanga 9 0.45097977 0.676469655
8 Erasama 0 0 0
4.5 Water Demand for Power Generation No water has been provisioned for power generation.
District Irrigation Plan (DIP), Jagatsinghpur Page 57
4.6 Total Water Demand of the District for Various Sectors The water demand for various sectors for various blocks was added up to find out
the overall water demand for the different blocks and the district for the present
period. It is worked out that 1.850 BCM of water is required for the district to meet
the domestic, crop, livestock and industrial requirements as given in Table 4.6.
Table 4.6 Total Water Demand
S. No
Block
Components
Total, BCM
Domestic Crop Livestock Industrial Power
generation
1 Jagatsinghpur 0.004457701 0.332586 0.000509448 0 0 0.3375531
2 Raghunathpur 0.002626452 0.2051092 0.000255904 0 0 0.2079916
3 Balikuda 0.00518957 0.3644047 0.000672296 0 0 0.3702666
4 Biridi 0.002599705 0.1959285 0.000310579 0 0 0.1988388
5 Naugaon 0.00242687 0.2066175 0.000348909 0 0 0.2093933
6 Tirtol 0.005058462 0.3614535 0.000596888 0 0 0.3671088
7 Kujanga 0.005528378 0.3613875 0.00058609 0.0450980 0 0.4125999
8 Erasama 0.004592897 0.3999412 0.000605894 0 0 0.4051400
Total 0.032480036 2.4274282 0.003886008 0.0450980 0 2.5088923
District Irrigation Plan (DIP), Jagatsinghpur Page 58
4.7 Water Budget
On finding the demand and availability, the gap in the district for the present
level and for 2020 was worked out (Table 4.6). The present demand and projected
demand for 2020 in the district comes to be 2.51 and 2.85 BCM, respectively
indicating a gap of 0.830 BCM for the present and 1.019 BCM for the projected
demand of 2020.
Table 4.7 Water budget
Name of the Blocks
Existing water availability (BCM) Total
(BCM)
Water Demand (BCM)
Water Gap (BCM)
Surface of water
Ground water
Present 2015
Projected (2020)
Present 2015
Projected (2020)
Jagatsinghpur
0.195822 0.0659325 0.261754 0.337553 0.3837979 0.075799 0.1220434
Raghunathpur
0.113244 0.14355 0.256794 0.207991 0.2364864 -0.048802 -0.0203075
Balikuda 0.182223 0.068385 0.250608 0.370267 0.4209931 0.119659 0.1703851
Biridi 0.111483 0.046635 0.158118 0.198839 0.2260797 0.040721 0.0679617
Naugaon 0.027744 0.0607725 0.088516 0.209393 0.2380801 0.120877 0.1495636
Tirtol 0.223215 0.0573675 0.280582 0.367109 0.4174028 0.086526 0.1368203
Kujanga 0.177582 0.04131 0.218892 0.412600 0.4691261 0.193708 0.2502341
Erasama 0.070786 0.0542475 0.125034 0.405140 0.4606442 0.280106 0.3356102
Total 1.102099 0.5382 1.640299 2.508892 2.8526105 0.868593 1.2123110
District Irrigation Plan (DIP), Jagatsinghpur Page 59
Chapter V Strategic Action Plan for Irrigation
Stragetic plan was prepared for Jagatsinghpur district by considering the water availability
status i.e. canal, river network, drainage network pattern. Landuse classification, slope and
cropped area were also been considered while preparing the strategic plan for the district.
Stragic plan with detail budget and component wise break up is given in Table 5.1 Block
wise specific irrigation approach is given in Fig. 5.1 to 5.8.
Fig. 5.1 Existing water resource of Jagatsinghpur block (River, canal, drain and water
bodies)
Sl. No Specific strategic plan
1 Constructions of field channel
2 Renovation of Dead Rivers & Constrituion of Check dams.
3 Renovation of Drainage system & construction of Check dam.
4 Renovation, linning & concrete work in Distributries of Major Irrigation.
5 Construction of New LIP.
6 Addeption of Micro Irrigation through Drips and Sprinkler
7 Renovation of Farm Pond.
District Irrigation Plan (DIP), Jagatsinghpur Page 60
Fig. 5.2 Existing water resource of Raghunathpur block (River, canal, drain and water
bodies)
Sl. No Specific strategic plan
1 Constructions of field channel
2 Renovation of Dead Rivers & Constrituion of Check dams.
3 Renovation of Drainage system & construction of Check dam.
4 Renovation, linning & concrete work in Distributries of Major Irrigation.
5 Construction of New LIP.
6 Addeption of Micro Irrigation through Drips and Sprinkler
7 Renovation of Farm Pond.
District Irrigation Plan (DIP), Jagatsinghpur Page 61
Fig. 5.3 Existing water resource of Balikuda block (River, canal, drain and water
bodies)
Sl. No Specific strategic plan
1 Constructions of field channel
2 Renovation of Dead Rivers & Constrituion of Check dams.
3 Renovation of Drainage system & construction of Check dam.
4 Renovation, linning & concrete work in Distributries of Major Irrigation.
5 Construction of New LIP.
6 Addeption of Micro Irrigation through Drips and Sprinkler
7 Renovation of Farm Pond.
District Irrigation Plan (DIP), Jagatsinghpur Page 62
Fig. 5.4 Existing water resource of Biridi block (River, canal, drain and water bodies)
Sl. No Specific strategic plan
1 Constructions of field channel
2 Renovation of Dead Rivers & Constrituion of Check dams.
3 Renovation of Drainage system & construction of Check dam.
4 Renovation, linning & concrete work in Distributries of Major Irrigation.
5 Construction of New LIP.
6 Addeption of Micro Irrigation through Drips and Sprinkler
7 Renovation of Farm Pond.
District Irrigation Plan (DIP), Jagatsinghpur Page 63
Fig. 5.5 Existing water resource of Nuagaon block (River, canal, drain and water
bodies)
Sl. No Specific strategic plan
1 Constructions of field channel
2 Renovation of Dead Rivers & Constrituion of Check dams.
3 Renovation of Drainage system & construction of Check dam.
4 Renovation, linning & concrete work in Distributries of Major Irrigation.
5 Construction of New LIP.
6 Addeption of Micro Irrigation through Drips and Sprinkler
7 Renovation of Farm Pond.
District Irrigation Plan (DIP), Jagatsinghpur Page 64
Fig. 5.6 Existing water resource of Tirtol block (River, canal, drain and water bodies)
Sl. No Specific strategic plan
1 Constructions of field channel
2 Renovation of Dead Rivers & Constrituion of Check dams.
3 Renovation of Drainage system & construction of Check dam.
4 Renovation, linning & concrete work in Distributries of Major Irrigation.
5 Construction of New LIP.
6 Addeption of Micro Irrigation through Drips and Sprinkler
7 Renovation of Farm Pond.
District Irrigation Plan (DIP), Jagatsinghpur Page 65
Fig. 5.7 Existing water resource of Kujanga block (River, canal, drain and water
bodies)
Sl. No Specific strategic plan
1 Constructions of field channel
2 Renovation of Dead Rivers & Constrituion of Check dams.
3 Renovation of Drainage system & construction of Check dam.
4 Renovation, linning & concrete work in Distributries of Major Irrigation.
5 Construction of New LIP.
6 Addeption of Micro Irrigation through Drips and Sprinkler
7 Renovation of Farm Pond.
District Irrigation Plan (DIP), Jagatsinghpur Page 66
Fig. 5.8 Existing water resource of Ersama block (River, canal, drain and water bodies)
Sl. No Specific strategic plan
1 Constructions of field channel
2 Renovation of Dead Rivers & Constrituion of Check dams.
3 Renovation of Drainage system & construction of Check dam.
4 Renovation, linning & concrete work in Distributries of Major Irrigation.
5 Construction of New LIP.
6 Addeption of Micro Irrigation through Drips and Sprinkler
7 Renovation of Farm Pond.
District Irrigation Plan (DIP), Jagatsinghpur Page 67
Chapter V
5 Strategic Action plan for Irrigation in District under PMKSY
S.No
Name of the
Blocks/Sub Districts
Concerned
Ministry/
Department
Component
Activity / Sources
Name of the Project / Work
Description of Work
Total Number/Capacity(cum)
Area benefited /Comman
d Area/Irri
gation Potential(
Ha)
Period of Implementation^/ 7 yrs)
Estimate d
cost(in Lakhs.)
Period of Implementation^/ 5 yrs)
16-17 17-18 18-19 19-20 20-21
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 Jagatsinghpur
State Irrigati
on Department (
Irr. Dvn.
Jspur.)
Har khat
ko Pani
RRR (Major
Irrigation/
Machhagaon Canal)
Renovation of Disty No.19-B (Both
Bank) from RD 00 Km to 1.500 Km and
Construction of Guard wall and
outlets.
Renovation, Linning,
Earth work & Concrete
work
1 184 5 100.00 20.00 20.00 20.00 20.00 20.00
2 Jagatsinghpur
-do- -do- Renovation of
Naranpur Minor & Kendal Minor
Renovation, Linning,
Earth work & Concrete
work
1 92 5 50.00 10.00 10.00 10.00 10.00 10.00
3 Jagatsinghpur
-do- -do- -do-
Renovation ofJaisol Sub-minor,
Birampur Sub-minor & Ranahata
Sub-minor
Renovation, linning, Earth
work & Concrete
work
1 92 5 50.00 10.00 10.00 10.00 10.00 10.00
4 Jagatsinghpur
-do- -do- -do-
Renovation of Disty No.19-A1 and
Atamula Minor & Construction of
Guard wall, 2 Nos of VRB and 3 Nos of
outlets
Renovation, Linning,
Earth work & Concrete
work
1 120 5 65.00 10.00 10.00 10.00 20.00 15.00
District Irrigation Plan (DIP), Jagatsinghpur Page 68
5 Jagatsinghpur
-do- -do- -do-
Renovation of Disty No.19-A2 and
construction of Guard wall
Renovation, Linning,
Earth work & Concrete
work
1 92 5 50.00 10.00 10.00 10.00 10.00 10.00
6 Jagatsinghpur
-do- -do- -do- Renovation of
Raslpur Minor & Purana Minor
Renovation, Linning,
Earth work & Concrete
work
1 74 5 40.00 8.00 8.00 8.00 8.00 8.00
7 Jagatsinghpur
-do- -do- -do- Renovation of
Chadheigaon Minor
Renovation, Linning,
Earth work & Concrete
work
1 66 5 36.00 9.00 9.00 9.00 9.00 0.00
8 Jagatsinghpur
-do- -do- -do- Renovation of Disty
no. 19-B2
Renovation, Linning,
Earth work & Concrete
work
1 55 5 30.00 7.00 7.00 7.00 9.00 0.00
9 Jagatsinghpur
-do- -do- -do- Renovation of
Nakulanga minor and Tarkani minor
Renovation, Linning,
Earth work & Concrete
work
1 46 5 25.00 5.00 5.00 5.00 5.00 5.00
10 Jagatsinghpur
-do- -do- -do- Renovation of Disty
No.19-D
Renovation, Linning,
Earth work & Concrete
work
1 83 5 45.00 9.00 9.00 9.00 9.00 9.00
11 Jagatsinghpur
-do- -do- -do-
Renovation of Bhokanji minor &
Construction of Guard wall.
Earth work & Concrete
work 1 92 5 50.00 10.00 10.00 10.00 10.00 10.00
12 Jagatsinghpur
-do- -do- -do- Renovation of
Maindasuni Sub-minor
Renovation, Linning &
R/S & Renovation of outlets &
Drainage syphon
1 83 5 45.00 9.00 9.00 9.00 9.00 9.00
District Irrigation Plan (DIP), Jagatsinghpur Page 69
13 Jagatsinghpur
-do- -do- -do-
Construction of 2 Nos VRB near
Patenigaon and Chakuli on Disty No-
19.
Concrete 1 66 5 36.00 9.00 9.00 9.00 9.00 0.00
14 Jagatsinghpur
-do- -do- -do-
Renovation of Disty No.10-G with
construction of Guard wall.
Earth work & Concrete
work 1 147 5 80.00 20.00 20.00 20.00 10.00 10.00
15 Jagatsinghpur
-do- -do- -do-
Renovation of Jahanpur Minor &
Construction of VRB.
Renovation, Linning,
Earth work & Concrete
work
1 81 5 44.00 11.00 11.00 11.00 11.00 0.00
16 Jagatsinghpur
-do- -do- -do-
Renovation of Disty No.19-A and
construction of Guard wall
Earth work & Concrete
work 1 74 5 40.00 8.00 8.00 8.00 8.00 8.00
17 Jagatsinghpur
-do- -do- -do-
Raising & stengthening of
Disty No.19-B1 & Arana Minor.
Renovation, Linning,
Earth work & Concrete
work
1 46 5 25.00 5.00 5.00 5.00 5.00 5.00
18 Jagatsinghpur
-do- -do- -do-
Renovation of Benupur minor and
Construction of Guard wall.
Renovation, Linning,
Earth work & Concrete
work
1 74 5 40.00 8.00 8.00 8.00 8.00 8.00
19 Jagatsinghpur
-do- -do- -do-
Renovation of Patenigaon minor
and construction of Guard wall
Renovation, Linning,
Earth work & Concrete
work
1 83 5 45.00 9.00 9.00 9.00 9.00 9.00
20 Jagatsinghpur
-do- -do- -do- Renovation of Disty
No.9
Earth work & Concrete
work 1 74 5 40.00 8.00 8.00 8.00 8.00 8.00
21 Jagatsinghpur
-do- -do- -do- Renovation of Disty
No.10-B
Earth work & Concrete
work 1 184 5 100.00 20.00 20.00 20.00 20.00 20.00
22 Jagatsinghpur
-do- -do- -do- Renovation of Arilo
Sub-minor
Earth work & Concrete
work 1 64 5 35.00 7.00 7.00 7.00 7.00 7.00
District Irrigation Plan (DIP), Jagatsinghpur Page 70
23 Jagatsinghpur
-do- -do- -do- Renovation of
Kathiapada Sub-minor
Earth work & Concrete
work 1 92 5 50.00 10.00 10.00 10.00 10.00 10.00
24 Jagatsinghpur
-do- -do- -do- Renovation of Palli
minor
Earth work & Concrete
work 1 92 5 50.00 10.00 10.00 10.00 10.00 10.00
25 Jagatsinghpur
-do- -do- -do-
Renovation of Chatra minor with construction of tail
cluster.
Renovation, Linning,
Earth work & Concrete
work
1 64 5 35.00 7.00 7.00 7.00 7.00 7.00
26 Jagatsinghpur
-do- -do- -do-
Renovation of Palasa minor,
Savamul Minor & Arana Minor
Renovation, Linning,
Earth work & Concrete
work
1 111 5 60.00 15.00 15.00 15.00 15.00 0.00
27 Jagatsinghpur
-do- -do- -do-
Renovation of Sagadhua minor and
Construction of Guard wall.
Renovation, Linning,
Earth work & Concrete
work
1 111 5 60.00 15.00 15.00 15.00 15.00 0.00
28 Raghunathpur
-do- -do- -do- Renovation of Jira
Minor
Earth work & Concrete
work 1 64 5 35.00 5.00 5.00 5.00 10.00 10.00
29 Raghunathpur
-do- -do- -do- Renovation of Disty
No.8
Earth work & Concrete
work 1 74 5 40.00 8.00 8.00 8.00 8.00 8.00
30 Raghunathpur
-do- -do- -do- Renovation of Disty
No.9 & its system
Earth work & Concrete
work 1 63 5 34.00 5.00 5.00 5.00 10.00 9.00
31 Raghunathpur
-do- -do- -do-
Renovation of Disty No.7 from RD 1.00
Km to 19.000 Km & Construction of
Guard wall.
Renovation, Linning,
Earth work & Concrete
work
1 147 5 80.00 15.00 15.00 15.00 15.00 20.00
32 Raghunathpur
-do- -do- -do-
Renovation of Disty No.7-B & its system
including Construction of
Guard wall & outlets.
Renovation, Linning,
Earth work & Concrete
work
1 92 5 50.00 12.00 13.00 12.00 13.00 0.00
District Irrigation Plan (DIP), Jagatsinghpur Page 71
33 Raghunathpur
-do- -do- -do-
Renovation of Disty No.7-A & its system
including Construction of
Guard wall & outlets.
Renovation, Linning,
Earth work & Concrete
work
1 92 5 50.00 12.00 13.00 12.00 13.00 0.00
34 Raghunathpur
-do- -do- -do-
Renovation of Disty No.7-C & 7-D & its system including Construction of
Guard wall & outlets.
Renovation, Linning,
Earth work & Concrete
work
1 74 5 40.00 8.00 8.00 8.00 8.00 8.00
35 Raghunathpur
-do- -do- -do-
Renovation of Tihada Sub-minor,
Banikuda Sub-minor, Tanara Sub-minor, Khandatari Sub-minor of Disty
No.7 including Construction of
Guard wall & outlets.
Renovation, Linning,
Earth work & Concrete
work
1 53 5 29.00 8.00 8.00 8.00 5.00 0.00
36 Raghunathpur
-do- -do- -do- Renovation of Disty
No.7
Earth work & Concrete
work 1 147 5 80.00 15.00 15.00 15.00 15.00 20.00
37 Balikuda -do- -do- -do-
Renovation of Ramachandrapur
minor, Gada minor, Talakusuma,
Sarambo minor & Titinga minor
Renovation, Linning,
Earth work & Concrete
work
1 111 5 60.00 15.00 15.00 15.00 15.00 0.00
38 Balikuda -do- -do- -do-
Renovation of Disty No.13 from RD 10.500 Km to 12.300 Km &
construction of guard wall & 4 Nos
of outlet.
Renovation, Linning,
Earth work & Concrete
work
1 74 5 40.00 8.00 8.00 8.00 8.00 8.00
39 Balikuda -do- -do- -do-
Renovation of Dalana Minor with
Construction of guard wall.
Renovation, Linning,
Earth work & Concrete
work
1 55 5 30.00 6.00 6.00 6.00 6.00 6.00
District Irrigation Plan (DIP), Jagatsinghpur Page 72
40 Balikuda -do- -do- -do- Renovation of
Dalana Minor with repair of outlets.
Renovation, Linning,
Earth work & Concrete
work
1 55 5 30.00 6.00 6.00 6.00 6.00 6.00
41 Balikuda -do- -do- -do-
Renovation of Disty No.14 from RD 4.00 Km to 11.990 Km, including repair of
syphon and 4 Nos of outlets.
Renovation, Linning,
Earth work & Concrete
work
1 166 5 90.00 15.00 15.00 15.00 20.00 25.00
42 Jagatsinghpur
-do- -do- -do- Renovation of 10
G
Renovation, Linning,
Earth work & Concrete
work
1 111 5 60.00 10.00 10.00 10.00 10.00 20.00
43 Jagatsinghpur
-do- -do- -do- Renovation of Disty. No 10-E
Renovation, linning,
Earth work & Concrete
work
1 111 5 60.00 15.00 15.00 10.00 10.00 10.00
44 Jagatsinghpur
-do- -do- -do- Renovation of Disty No.10-H
Renovation, Linning,
Earth work & Concrete
work
1 111 5 60.00 15.00 15.00 10.00 10.00 10.00
45 Jagatsinghpur
-do- -do- -do- Renovation of Disty No.10-B
Renovation, Linning,
Earth work & Concrete
work
1 111 5 60.00 15.00 15.00 10.00 10.00 10.00
46 Jagatsinghpur
-do- -do- -do- Renovation of 10-
B1
Renovation, Linning,
Earth work & Concrete
work
1 74 5 40.00 8.00 8.00 8.00 8.00 8.00
47 Jagatsinghpur
-do- -do- -do- Renovation
ofDisty. No 10-C -do- 1 92 5 50.00 10.00 10.00 10.00 10.00 10.00
District Irrigation Plan (DIP), Jagatsinghpur Page 73
48 Jagatsinghpur
-do- -do- -do- Renovation of
Disty no. 10-E1
Renovation, Linning,
Earth work & Concrete
work
1 92 5 50.00 10.00 10.00 10.00 10.00 10.00
49 Jagatsinghpur
-do- -do- -do- Renovation of Disty. No 10-F
Renovation, Linning,
Earth work & Concrete
work
1 46 5 25.00 5.00 5.00 5.00 5.00 5.00
50 Jagatsinghpur
-do- -do- -do- Renovation
ofChatra Feeder
Renovation, Linning,
Earth work & Concrete
work
1 92 5 50.00 10.00 10.00 10.00 10.00 10.00
51 Jagatsinghpur
-do- -do- -do- Renovation of Disty. No 12
Renovation, Linning,
Earth work & Concrete
work
1 55 5 30.00 10.00 10.00 10.00 0.00 0.00
52 Jagatsinghpur
-do- -do- -do- Renovation of
Arilo Sub minor
Renovation, Linning,
Earth work & Concrete
work
1 74 5 40.00 10.00 10.00 10.00 10.00 0.00
53 Jagatsinghpur
-do- -do- -do- Renovation of Disty. No 11
Renovation, Linning,
Earth work & Concrete
work
1 55 5 30.00 10.00 10.00 10.00 0.00 0.00
54 Jagatsinghpur
-do- -do- -do- Renovation of Kusinga Minor
Renovation, Linning,
Earth work & Concrete
work
1 55 5 30.00 0.00 10.00 10.00 10.00 0.00
Total ( Irr. Dvn. Jspur.) 54 4788 270 2599 545 557 540 536 421
District Irrigation Plan (DIP), Jagatsinghpur Page 74
1 Biridi
State Irrigation Departme
nt ( Irr. Div.
Mahandi South)
Har khet Ko
pani
RRR (Major
Irrigation/
Taladanda
Canal)
Canals system / Disty. Minor & S/M
Repair, restoration & Renovation
1 3684 5 2000 500 500 500 500 0
Tirtol ( Irr. Div. Mahandi South) 1 3684 5 2000 500 500 500 500 0
1 Jagatsinghpur
Drainage
Har khet Ko
pani
(RRR) Alaka D/C
Imp. to Alaka D/C Renovation of the drain
1 0 3 750.00 300.00 300.00 150.00 0.00 0.00
2 Jagatsinghpur
Drainage
(RRR) Brudha
D/C
Imp. to Bionl Drainage Channel
Renovation of the drain
1 0 1 50.00 50.00 0.00 0.00 0.00 0.00
3 Jagatsinghpur
Drainage
(RRR) Gobari
D/C
Imp. to Bhokanji Drainage Channel
Renovation of the drain
1 0 1 40.00 40.00 0.00 0.00 0.00 0.00
4 Jagatsinghpur
Drainage -do- (RRR) Gobari
D/C
Imp. to Patenigan Drainage Channel
Renovation of the drain
1 0 1 30.00 0.00 0.00 0.00 30.00 0.00
5 Jagatsinghpur
Drainage -do- (RRR) Gobari
D/C
Imp. to Kodal Drainage Channel
Renovation of the drain
1 0 1 30.00 0.00 0.00 0.00 0.00 30.00
6 Jagatsinghpur
Drainage -do- (RRR) Gobari
D/C
Imp. to Ekasudha Drainage Channel
Renovation of the drain
1 0 1 30.00 0.00 30.00 0.00 0.00 0.00
7 Jagatsinghpur
Drainage -do- (RRR) Gobari
D/C
Imp. to Mandasahi Drainage Channel
Renovation of the drain
1 0 1 20.00 20.00 0.00 0.00 0.00 0.00
8 Jagatsinghpur
Drainage -do- -do- Imp. to Tampua
Drainage Channel Renovation of the drain
1 0 1 25.00 25.00 0.00 0.00 0.00 0.00
9 Jagatsinghpur
Drainage -do- (RRR)
Devi river Imp. to Gobari
Drainage Channel Renovation of the drain
1 0 5 1860.98 400.00 400.00 400.00 400.00 260.98
10 Jagatsinghpur
Drainage -do- (RRR) Gobari
D/C
Imp. to Madhusudanpur
Drainage Channel
Renovation of the drain
1 0 1 30.00 0.00 0.00 0.00 0.00 30.00
District Irrigation Plan (DIP), Jagatsinghpur Page 75
11 Jagatsinghpur
Drainage -do- (RRR) Gobari
D/C
Imp. to Madhusudanpur
Drainage Channel
Renovation of the drain
1 0 1 30.00 0.00 0.00 0.00 30.00 0.00
12 Jagatsinghpur
Drainage -do- (RRR) Gobari
D/C
Imp. to Benukanda
Drainage Channel
Renovation of the drain
1 0 1 30.00 0.00 0.00 30.00 0.00 0.00
13 Jagatsinghpur
Drainage -do- (RRR) Gobari
D/C
Imp. to Patoli Drainage Channel
Renovation of the drain
1 0 1 30.00 0.00 30.00 0.00 0.00 0.00
14 Jagatsinghpur
Drainage -do- (RRR)Hansua D/C
Imp. to Taradapada
(From 40.76 km to 96.37 km) (
Jaipur to Jatadhari Muhan)
Renovation of the drain
1 0 1 30.00 30.00 0.00 0.00 0.00 0.00
15 Jagatsinghpur
Drainage -do- (RRR)Nagpur D/C
Imp. to Kherasa (From 40.76 km
to 96.37 km) ( Jaipur to
Jatadhari Muhan)
Renovation of the drain
1 0 1 30.00 30.00 0.00 0.00 0.00 0.00
16 Jagatsinghpur
Drainage -do- (RRR)Nagpur D/C
Imp. to Dighi (From 40.76 km
to 96.37 km) ( Jaipur to
Jatadhari Muhan)
Renovation of the drain
1 0 1 30.00 0.00 30.00 0.00 0.00 0.00
17 Jagatsinghpur
Drainage -do- (RRR)
Hansua D/C
Imp. to Sidhal (From 40.76 km
to 96.37 km) ( Jaipur to
Jatadhari Muhan)
Renovation of the drain
1 0 1 35.00 0.00 0.00 35.00 0.00 0.00
18 Jagatsinghpur
Drainage -do- (RRR)
Nagpur D/C
Imp. to Gamutipur (From 40.76 km to 96.37 km) (
Jaipur to Jatadhari Muhan)
Renovation of the drain
1 0 1 30.00 0.00 0.00 0.00 30.00 0.00
19 Jagatsinghpur
Drainage -do- (RRR)
Hansua D/C
Imp. to Chheligagarh to Rankei Drainage
Channel
Renovation of the drain
1 0 1 30.00 0.00 0.00 0.00 0.00 30.00
District Irrigation Plan (DIP), Jagatsinghpur Page 76
20 Jagatsinghpur
Drainage -do- (RRR)
Hansua D/C
Imp. to Madhupur Rankei Drainage
Channel
Renovation of the drain
1 0 1 55.00 55.00 0.00 0.00 0.00 0.00
21 Jagatsinghpur
Drainage -do- (RRR)
Hansua D/C
Imp. to Tira to Rankei Drainage
Channel
Renovation of the drain
1 0 1 40.00 0.00 40.00 0.00 0.00 0.00
22 Jagatsinghpur
Drainage -do- (RRR)
Brudha D/C
Imp. to Harsinghpur
Dr.Cut
Renovation of the drain
1 0 1 50.00 0.00 0.00 50.00 0.00 0.00
23 Jagatsinghpur
Drainage -do- (RRR)
Biluakhai river
Imp. to Gaichara D/C
Renovation of the drain
1 0 1 60.00 0.00 0.00 0.00 60.00 0.00
24 Jagatsinghpur
Drainage -do- (RRR)
Madhapur D/C
Imp. to Puakhai D/C
Renovation of the drain
1 0 1 30.00 0.00 0.00 0.00 0.00 30.00
25 Raghunathpur
Drainage -do- (RRR)
Hansua D/C
Imp. to Barapata Drainage Cut
Renovation of the drain
1 0 1 40.00 40.00 0.00 0.00 0.00 0.00
26 Raghunathpur
Drainage -do- (RRR)
Hansua D/C
Imp. to D/C from Puruna Syphone
to Odapad
Renovation of the drain
1 0 1 50.00 0.00 50.00 0.00 0.00 0.00
27 Raghunathpur
Drainage -do- (RRR)
Hansua D/C
Imp. to Jagannathpur to
Barti
Renovation of the drain
1 0 1 50.00 0.00 0.00 50.00 0.00 0.00
28 Raghunathpur
Drainage -do- (RRR)
Hansua D/C
Imp. to Drainage Cut from Barti to
Kortanga
Renovation of the drain
1 0 1 50.00 0.00 0.00 0.00 50.00 0.00
29 Raghunathpur
Drainage -do- (RRR)
Hansua D/C
Imp. to D/C from Tanara to Dead
Kathjori
Renovation of the drain
1 0 1 40.00 0.00 0.00 0.00 0.00 40.00
30 Raghunathpur
Drainage -do- (RRR)
Hansua D/C
Imp. to Drainage Cut from
Talapatak to Raipat
Renovation of the drain
1 0 1 100.00 100.00 0.00 0.00 0.00 0.00
31 Raghunathpur
Drainage -do- (RRR)
Hansua D/C
Imp. to Drainage Cut from
Sadheikana Nala
Renovation of the drain
1 0 1 40.00 0.00 40.00 0.00 0.00 0.00
District Irrigation Plan (DIP), Jagatsinghpur Page 77
32 Raghunathpur
Drainage -do- (RRR)
Hansua D/C
Imp. to Drainage Cut from Satapura
to Jaisol
Renovation of the drain
1 0 1 50.00 0.00 0.00 50.00 0.00 0.00
33 Raghunathpur
Drainage -do- (RRR)
Hansua D/C
Imp. to Drainage Cut from Bada
Korakara to Salijanga
Renovation of the drain
1 0 1 100.00 0.00 0.00 0.00 100.00 0.00
34 Raghunathpur
Drainage -do- (RRR)
Hansua D/C
Imp. to D/C from Bodar Syphone to
Hansua
Renovation of the drain
1 0 1 105.00 0.00 0.00 0.00 0.00 105.00
35 Raghunathpur
Drainage -do- (RRR)
Hansua D/C
Imp. to D/C from Sudhabhuin to Jaganathapur
Renovation of the drain
1 0 1 20.00 0.00 0.00 0.00 0.00 20.00
36 Raghunathpur
Drainage -do- (RRR)
Hansua D/C
Imp. to D/C from Raghunathpur
Syphone to Hansua
Renovation of the drain
1 0 1 50.00 0.00 0.00 0.00 50.00 0.00
37 Raghunathpur
Drainage -do- (RRR)
Hansua D/C
Imp. to D/C from Barti to Kurtang to
Chikinia to Kalajhari to Harishpur
Renovation of the drain
1 0 1 110.00 110.00 0.00 0.00 0.00 0.00
38 Raghunathpur
Drainage -do- (RRR)
Hansua D/C
Imp. to D/C from Bhoipada to Radhanagar
Renovation of the drain
1 0 1 110.00 0.00 110.00 0.00 0.00 0.00
39 Raghunathpur
Drainage -do- (RRR)
Hansua D/C
Imp. to D/C from Follar Across South
Channel
Renovation of the drain
1 0 1 20.00 0.00 0.00 20.00 0.00 0.00
40 Raghunathpur
Drainage -do- (RRR)
Hansua D/C
Imp. to D/C from Samantarapur to
Boohapur
Renovation of the drain
1 0 1 40.00 0.00 0.00 0.00 40.00 0.00
41 Raghunathpur
Drainage -do- (RRR)
Hansua D/C
Imp. to Hansua Main Drainage Channel
from 0.00 Km to 40.76
Km.
Renovation of the drain
1 0 2 1000.00 500.00 500.00 0.00 0.00 0.00
42 Raghunathpur
Drainage -do- (RRR)
Hansua D/C
Imp. to D/C from Sompur to Talalapada
Syphone
Renovation of the drain
1 0 1 105.00 0.00 0.00 105.00 0.00 0.00
District Irrigation Plan (DIP), Jagatsinghpur Page 78
43 Raghunathpur
Drainage -do- (RRR)
Brudha D/C
Imp. to Kothakana D/C
Renovation of the drain
1 0 1 105.00 0.00 0.00 0.00 105.00 0.00
44 Raghunathpur
Drainage -do- -do- Imp. to Jamarai
D/C Renovation of the drain
1 0 1 35.00 0.00 0.00 0.00 0.00 35.00
45 Raghunathpur
Drainage -do- (RRR)
Madhapur D/C
Imp. to Majurai D/C
Renovation of the drain
1 0 1 30.00 30.00 0.00 0.00 0.00 0.00
46 Raghunathpur
Drainage -do- (RRR)
Paika D/C Imp. to Baliapatta
D/C Renovation of the drain
1 0 1 30.00 0.00 30.00 0.00 0.00 0.00
47 Raghunathpur
Drainage -do- (RRR)
Hansua D/C
Imp. to Kruamanga D/C
Renovation of the drain
1 0 1 30.00 0.00 0.00 30.00 0.00 0.00
48 Raghunathpur
Drainage -do- -do- Imp. to
Adheikurla D/C Renovation of the drain
1 0 1 30.00 0.00 0.00 0.00 30.00 0.00
49 Raghunathpur
Drainage -do- -do- Imp. to Nadiakhai
D/C Renovation of the drain
1 0 1 30.00 0.00 0.00 0.00 0.00 30.00
50 Raghunathpur
Drainage -do- -do- Imp. to Gopalpur
D/C Renovation of the drain
1 0 1 30.00 30.00 0.00 0.00 0.00 0.00
51 Raghunathpur
Drainage -do- -do- Imp. to
Khandatori D/C Renovation of the drain
1 0 1 30.00 0.00 30.00 0.00 0.00 0.00
52 Balikuda Drainage -do- (RRR)
Devi river
Imp. to link drains & Sub-Drains of
Balipatana to Balijori (Sarunai)
D/S
Renovation of the drain
1 0 1 551.25 151.25 100.00 100.00 100.00 100.00
53 Balikuda Drainage -do- (RRR)
Devi river
Imp. to Mugura nala & it's 3 nos
link drains
Renovation of the drain
1 0 3 546.36 200.00 200.00 146.36 0.00 0.00
54 Balikuda Drainage -do- (RRR) Alaka D/C
Imp. to 6 nos. of link drains of
Alaka D/S (Gaiparia,
Gatiswarapur, Alabari, D/C No.
68 and Thailo Titira)
Renovation of the drain
1 0 2 170.23 0.00 0.00 0.00 100.00 70.23
District Irrigation Plan (DIP), Jagatsinghpur Page 79
55 Balikuda Drainage -do- (RRR) Alaka D/C
Imp. to Old Alaka D/C
Renovation of the drain
1 0 2 250.21 150.00 100.21 0.00 0.00 0.00
56 Balikuda Drainage -do- (RRR) Alaka D/C
Imp. to Tuntuna D/C
Renovation of the drain
1 0 1 60.55 0.00 0.00 60.55 0.00 0.00
57 Balikuda Drainage -do- (RRR) Alaka D/C
Imp. to Tihudi Rahane D/C
Renovation of the drain
1 0 2 80.30 0.00 0.00 0.00 40.00 40.30
58 Balikuda Drainage -do- (RRR) Alaka D/C
Imp. to Ambasala Rahane D/C
Renovation of the drain
1 0 1 70.75 0.00 0.00 70.75 0.00 0.00
59 Balikuda Drainage -do- (RRR)
Hansua D/C
Imp. to Gadarmala D/C
Renovation of the drain
1 0 1 65.12 0.00 65.12 0.00 0.00 0.00
60 Biridi Drainage -do- (RRR)
Hansua D/C
Imp. to Drainage Cut from Jaisol to
Hansua
Renovation of the drain
1 0 1 50.00 50.00 0.00 0.00 0.00 0.00
61 Biridi Drainage -do- (RRR)
Hansua D/C
Imp. to Drainage Cut from Balia to
Jaisol
Renovation of the drain
1 0 1 30.00 0.00 30.00 0.00 0.00 0.00
62 Biridi Drainage -do- (RRR)
Hansua D/C
Imp. to D/C from Tarikunda to
Banikunda
Renovation of the drain
1 0 1 40.00 0.00 0.00 40.00 0.00 0.00
63 Biridi Drainage -do- (RRR)
Hansua D/C
Imp. to D/C from Batimira to
Mahatol
Renovation of the drain
1 0 1 85.00 0.00 0.00 50.00 35.00 0.00
64 Biridi Drainage -do- (RRR) Gobari
D/C
Imp. to Adhanga Drainage Channel
Renovation of the drain
1 0 1 50.00 0.00 0.00 0.00 0.00 50.00
65 Naugaon Drainage -do- (RRR) Gobari
D/C
Imp. to link drains of Gobari D/S
Renovation of the drain
1 0 1 60.19 0.00 60.19 0.00 0.00 0.00
66 Naugaon Drainage -do- (RRR) Gobari
D/C
Imp. to Palasa Drainage Channel
Renovation of the drain
1 0 1 40.00 40.00 0.00 0.00 0.00 0.00
67 Naugaon Drainage -do- (RRR) Gobari
D/C
Imp. to Sainto Drainage Channel
Renovation of the drain
1 0 1 40.00 0.00 40.00 0.00 0.00 0.00
District Irrigation Plan (DIP), Jagatsinghpur Page 80
68 Naugaon Drainage -do- (RRR) Gobari
D/C
Imp. to Rohia Drainage Channel
Renovation of the drain
1 0 1 30.00 0.00 0.00 30.00 0.00 0.00
69 Naugaon Drainage -do- (RRR) Gobari
D/C
Imp. to Andhuti Drainage Channel
Renovation of the drain
1 0 1 25.00 0.00 0.00 0.00 25.00 0.00
70 Naugaon Drainage -do- (RRR)
Madhapur D/C
Imp. to Nandan (From 40.76 km
to 96.37 km) ( Jaipur to
Jatadhari Muhan)
Renovation of the drain
1 0 1 30.00 0.00 0.00 0.00 0.00 30.00
71 Naugaon Drainage -do- (RRR)
Hansua D/C
Imp. to Itang (From 40.76 km
to 96.37 km) ( Jaipur to
Jatadhari Muhan)
Renovation of the drain
1 0 2 60.00 30.00 30.00 0.00 0.00 0.00
72 Naugaon Drainage -do- (RRR) Gobari
D/C
Imp. to Asilo Dr.Cut
Renovation of the drain
1 0 1 40.00 0.00 0.00 40.00 0.00 0.00
73 Naugaon Drainage -do- (RRR) Gobari
D/C
Imp. to Dahanikhia D/C
Renovation of the drain
1 0 1 30.00 0.00 0.00 0.00 30.00 0.00
74 Naugaon Drainage -do- (RRR)
Devi river Imp. to Gobari
D/C Renovation of the drain
1 0 5 2000.00 400.00 400.00 400.00 400.00 400.00
75 Naugaon Drainage -do- (RRR)
Devi river Imp. to Bausajori
D/C Renovation of the drain
1 0 2 500.00 250.00 250.00 0.00 0.00 0.00
76 Tirtol Drainage -do- (RRR)
Hansua D/C
Imp. to Singarpur to Rankei
Drainage Channel
Renovation of the drain
1 0 1 30.00 0.00 0.00 30.00 0.00 0.00
77 Tirtol Drainage -do- (RRR)
Brudha D/C
Imp. to Chhapada D/C
Renovation of the drain
1 0 1 30.00 0.00 0.00 0.00 30.00 0.00
78 Tirtol Drainage -do- (RRR)
Brudha D/C
Imp. to Jaipur D/C Renovation of the drain
1 0 1 30.00 0.00 0.00 0.00 0.00 30.00
79 Tirtol Drainage -do- (RRR)
Brudha D/C
Imp. to Dandasahi D/C
Renovation of the drain
1 0 1 40.00 0.00 0.00 0.00 40.00 0.00
District Irrigation Plan (DIP), Jagatsinghpur Page 81
80 Tirtol Drainage -do- (RRR)
Brudha D/C
Imp. to Tirtol D/C Renovation of the drain
1 0 1 30.00 0.00 0.00 30.00 0.00 0.00
81 Tirtol Drainage -do- (RRR)
Hansua D/C
Imp. to Sadhusahi D/C
Renovation of the drain
1 0 1 30.00 0.00 30.00 0.00 0.00 0.00
82 Tirtol Drainage -do- (RRR)
Hansua D/C
Imp. to Athagotari D/C
Renovation of the drain
1 0 1 30.00 30.00 0.00 0.00 0.00 0.00
83 Tirtol Drainage -do- (RRR) Gobari
D/C
Imp. to Madanpur D/C
Renovation of the drain
1 0 1 30.00 30.00 0.00 0.00 0.00 0.00
84 Kujanga Drainage -do- (RRR)
Santara D/C
Imp. to Santara D/C
Renovation of the drain
1 0 3 400.77 150.00 150.00 100.77 0.00 0.00
85 Kujanga Drainage -do- (RRR)
Santara D/C
Imp. to Balia D/C Renovation of the drain
1 0 3 300.44 100.00 100.00 100.44 0.00 0.00
86 Kujanga Drainage -do- (RRR)
Mahanga D/C
Imp. to Udayachandapur
D/C
Renovation of the drain
1 0 2 85.00 40.00 45.00 0.00 0.00 0.00
87 Kujanga Drainage -do- (RRR)
Mahanga D/C
Imp. to Gadakujanga D/C
Renovation of the drain
1 0 1 30.00 0.00 30.00 0.00 0.00 0.00
88 Erasama Drainage -do- (RRR)
Mahanga D/C
Imp. to Mahanga nallah and its
system
Renovation of the drain
1 0 5 1065.00 200.00 200.00 200.00 200.00 265.00
89 Erasama Drainage -do- (RRR) Alaka D/C
Imp. to link drains & Sub-drains of
Sankha and Kamalapaka D/S
Renovation of the drain
1 0 1 250.45 250.45 0.00 0.00 0.00 0.00
90 Erasama Drainage -do- (RRR)
Hansua D/C
Imp. to 10 nos. of drains in Erasama block in Doab No-
1
Renovation of the drain
1 0 3 472.61 0.00 200.00 200.00 72.61 0.00
91 Erasama Drainage -do- (RRR)
Mahanga D/C
Imp. to Kanaguli Khurant D/C
Renovation of the drain
1 0 2 95.65 0.00 0.00 0.00 50.00 45.65
District Irrigation Plan (DIP), Jagatsinghpur Page 82
92 Erasama Drainage -do- (RRR)
Adhanga D/C
Imp. to Tanra Pokhariapada D/C
Renovation of the drain
1 0 1 75.45 0.00 0.00 75.45 0.00 0.00
93 Erasama Drainage -do- (RRR) Tigiria
D/C
Imp. to Telegunia D/C
Renovation of the drain
1 0 2 95.89 50.00 45.89 0.00 0.00 0.00
94 Erasama Drainage -do- (RRR)
Brudha D/C
Imp. to Kantapada Sundarkani D/C
Renovation of the drain
1 0 2 100.86 0.00 0.00 50.00 50.86 0.00
95 Erasama Drainage -do- (RRR) Tigiria
D/C
Imp. to Gunthiapata D/C
Renovation of the drain
1 0 1 40.36 0.00 0.00 0.00 0.00 40.36
96 Erasama Drainage -do- (RRR) Tigiria
D/C Imp. to Kiada D/C
Renovation of the drain
1 0 1 49.77 0.00 0.00 0.00 49.77 0.00
97 Erasama Drainage -do- (RRR)
Hansua D/C
Imp. to Barakolia D/C
Renovation of the drain
1 0 1 36.67 0.00 0.00 36.67 0.00 0.00
98 Erasama Drainage -do- (RRR)
Hansua D/C
Imp. to Japa to Kasiabelari D/C
Renovation of the drain
1 0 1 12.11 12.11 0.00 0.00 0.00 0.00
99 Erasama Drainage -do- (RRR) Tigiria
D/C
Imp. to Sunadiha D/C
Renovation of the drain
1 0 1 53.32 0.00 53.32 0.00 0.00 0.00
100
Erasama Drainage -do- (RRR)
Hansua D/C
Imp. to Hansua D/C
Renovation of the drain
1 0 5 500.75 100.00 100.00 100.00 100.00 100.75
101
Erasama Drainage -do- (RRR)
Mahanga D/C
Imp. to Kuranta to Balitutha D/C
Renovation of the drain
1 0 1 74.13 74.13 0.00 0.00 0.00 0.00
102
Erasama Drainage -do- (RRR)
Brudha D/C
Imp. to Basulei nala
Renovation of the drain
1 0 3 165.55 0.00 50.00 50.00 65.55 0.00
103
Erasama Drainage -do- (RRR)
Brudha D/C
Imp. to Tigiria nala
Renovation of the drain
1 0 3 270.43 0.00 100.00 100.00 70.43 0.00
District Irrigation Plan (DIP), Jagatsinghpur Page 83
104
Erasama Drainage -do- (RRR)
Adhanga D/C
Imp. to Nuapada nala
Renovation of the drain
1 0 1 32.00 32.00 0.00 0.00 0.00 0.00
105
Erasama Drainage -do- (RRR)
Brudha D/C
Imp. to Brudha D/C
Renovation of the drain
1 0 5 1000.00 200.00 200.00 200.00 200.00 200.00
Total Drainage RRR 105 0 149 16168.
15 4299.94 4169.73
3130.99
2584.22 1983.2
7
Total HKK
P RRR 160 8472 424
20767.15
5344.94 5226.73 4170.9
9 3620.22
2404.27
1 Jagatsinghpur
Drainage Har khet Ko
pani
Alaka D/C
Imp. to Alaka D/C Construction of check
dam 18 180 2 250.00 150.00 100.00 0.00 0.00 0.00
2 Jagatsinghpur
Drainage Gobari
D/C Imp. to Bhokanji
Drainage Channel check dam 1 10 1 15.00 15.00 0.00 0.00 0.00 0.00
3 Jagatsinghpur
Drainage -do- Gobari
D/C Imp. to Mandasahi Drainage Channel
check dam 1 10 1 10.00 10.00 0.00 0.00 0.00 0.00
4 Jagatsinghpur
Drainage -do- Devi river Imp. to Gobari
Drainage Channel check dam 11 110 1 200.00 200.00 0.00 0.00 0.00 0.00
5 Jagatsinghpur
Drainage -do- Gobari
D/C
Imp. to Madhusudanpur
Drainage Channel check dam 1 10 1 10.00 10.00 0.00 0.00 0.00 0.00
6 Jagatsinghpur
Drainage -do- Gobari
D/C
Imp. to Madhusudanpur
Drainage Channel check dam 1 10 1 10.00 10.00 0.00 0.00 0.00 0.00
7 Jagatsinghpur
Drainage -do- Nagpur
D/C
Imp. to Kherasa (From 40.76 km
to 96.37 km) ( Jaipur to
Jatadhari Muhan)
check dam 1 10 1 10.00 10.00 0.00 0.00 0.00 0.00
8 Jagatsinghpur
Drainage -do- Nagpur
D/C
Imp. to Dighi (From 40.76 km
to 96.37 km) ( Jaipur to
Jatadhari Muhan)
check dam 1 10 1 10.00 0.00 10.00 0.00 0.00 0.00
District Irrigation Plan (DIP), Jagatsinghpur Page 84
9 Jagatsinghpur
Drainage -do- Hansua
D/C
Imp. to Sidhal (From 40.76 km
to 96.37 km)( Jaipur to Jatadhari
Muhan)
check dam 2 20 1 35.00 0.00 35.00 0.00 0.00 0.00
10 Jagatsinghpur
Drainage -do- Nagpur
D/C
Imp. to Gamutipur (From 40.76 km to 96.37 km) (
Jaipur to Jatadhari Muhan)
check dam 1 10 1 10.00 0.00 0.00 10.00 0.00 0.00
11 Jagatsinghpur
Drainage -do- Hansua
D/C
Imp. to Chheligagarh to Rankei Drainage
Channel
check dam 1 10 1 10.00 0.00 0.00 10.00 0.00 0.00
12 Jagatsinghpur
Drainage -do- Hansua
D/C
Imp. to Madhupur Rankei Drainage
Channel check dam 3 30 1 45.00 0.00 0.00 45.00 0.00 0.00
13 Jagatsinghpur
Drainage -do- Brudha
D/C
Imp. to Harsinghpur
Dr.Cut check dam 1 10 1 15.00 0.00 0.00 15.00 0.00 0.00
14 Jagatsinghpur
Drainage -do- Biluakhai
river Imp. to Gaichara
D/C check dam 2 20 1 40.00 0.00 0.00 40.00 0.00 0.00
15 Jagatsinghpur
Drainage -do- Madhapu
r D/C Imp. to Puakhai
D/C check dam 1 10 1 10.00 0.00 0.00 0.00 10.00 0.00
16 Raghunathpur
Drainage -do- Hansua
D/C
Imp. to D/C from Puruna Syphone
to Odapad check dam 1 10 1 10.00 0.00 0.00 0.00 10.00 0.00
17 Raghunathpur
Drainage -do- Hansua
D/C
Imp. to Jagannathpur to
Barti check dam 1 10 1 10.00 0.00 0.00 0.00 10.00 0.00
18 Raghunathpur
Drainage -do- Hansua
D/C
Imp. to Drainage Cut from
Talapatak to Raipat
check dam 1 10 1 15.00 0.00 0.00 0.00 15.00 0.00
19 Raghunathpur
Drainage -do- Hansua
D/C
Imp. to Drainage Cut from Satapura
to Jaisol check dam 1 10 1 15.00 0.00 0.00 0.00 15.00 0.00
District Irrigation Plan (DIP), Jagatsinghpur Page 85
20 Raghunathpur
Drainage -do- Hansua
D/C
Imp. to Drainage Cut from Bada
Korakara to Salijanga
check dam 1 10 1 15.00 0.00 0.00 0.00 15.00 0.00
21 Raghunathpur
Drainage -do- Hansua
D/C
Imp. to D/C from Bodar Syphone to
Hansua check dam 1 10 1 15.00 0.00 0.00 0.00 15.00 0.00
22 Raghunathpur
Drainage -do- Hansua
D/C
Imp. to D/C from Raghunathpur
Syphone to Hansua
check dam 1 10 1 15.00 0.00 0.00 0.00 15.00 0.00
23 Raghunathpur
Drainage -do- Hansua
D/C
Imp. to D/C from Barti to Kurtang
to Chikinia to Kalajhari to Harishpur
check dam 2 20 1 40.00 0.00 0.00 0.00 40.00 0.00
24 Raghunathpur
Drainage -do- Hansua
D/C
Imp. to D/C from Bhoipada to Radhanagar
check dam 2 20 1 40.00 40.00 0.00 0.00 0.00 0.00
25 Raghunathpur
Drainage -do- Hansua
D/C
Imp. to Hansua Main Drainage Channel from
0.00 Km to 40.76 Km.
check dam 13 130 3 325.00 125.00 100.00 100.00 0.00 0.00
26 Raghunathpur
Drainage -do- Hansua
D/C
Imp. to D/C from Sompur to Talalapada
Syphone
check dam 1 10 1 15.00 15.00 0.00 0.00 0.00 0.00
27 Raghunathpur
Drainage -do- Brudha
D/C Imp. to Kothakana
D/C check dam 1 10 1 15.00 0.00 15.00 0.00 0.00 0.00
28 Raghunathpur
Drainage -do- Brudha
D/C Imp. to Jamarai
D/C check dam 1 10 15.00 0.00 0.00 15.00 0.00 0.00
29 Raghunathpur
Drainage -do- Madhapu
r D/C Imp. to Majurai
D/C check dam 1 10 10.00 10.00 0.00 0.00 0.00 0.00
30 Raghunathpur
Drainage -do- Paika D/C Imp. to Baliapatta
D/C check dam 1 10 10.00 0.00 10.00 0.00 0.00 0.00
31 Raghunathpur
Drainage -do- Hansua
D/C Imp. to
Kruamanga D/C check dam 1 10 10.00 0.00 0.00 10.00 0.00 0.00
District Irrigation Plan (DIP), Jagatsinghpur Page 86
32 Raghunathpur
Drainage -do- Hansua
D/C Imp. to
Adheikurla D/C check dam 1 10 10.00 0.00 0.00 0.00 10.00 0.00
33 Raghunathpur
Drainage -do- Hansua
D/C Imp. to Nadiakhai
D/C check dam 1 10 10.00 0.00 0.00 0.00 10.00 0.00
34 Raghunathpur
Drainage -do- Hansua
D/C Imp. to Gopalpur
D/C check dam 1 10 10.00 0.00 0.00 0.00 10.00 0.00
35 Raghunathpur
Drainage -do- Hansua
D/C Imp. to
Khandatori D/C check dam 1 10 10.00 0.00 0.00 0.00 10.00 0.00
36 Balikuda Drainage -do- Devi river
Imp. to link drains & Sub-Drains of
Balipatana to Balijori (Sarunai)
D/S
check dam 7 70 150.00 100.00 50.00 0.00 0.00 0.00
37 Balikuda Drainage -do- Devi river Imp. to Mugura nala & it's 3 nos
link drains check dam 8 80 200.00 0.00 0.00 100.00 100.00 0.00
38 Balikuda Drainage -do- Alaka D/C
Imp. to 6 nos. of link drains of
Alaka D/S (Gaiparia,
Gatiswarapur, Alabari, D/C No.
68 and Thailo Titira)
check dam 6 60 100.00 0.00 0.00 0.00 0.00 100.00
39 Balikuda Drainage -do- Alaka D/C
Imp. to Old Alaka D/C
check dam 2 20 50.00 50.00 0.00 0.00 0.00 0.00
40 Balikuda Drainage -do- Alaka D/C
Imp. to Tuntuna D/C
check dam 1 10 15.00 0.00 15.00 0.00 0.00 0.00
41 Balikuda Drainage -do- Alaka D/C
Imp. to Tihudi Rahane D/C
check dam 3 30 50.00 0.00 0.00 50.00 0.00 0.00
42 Balikuda Drainage -do- Alaka D/C
Imp. to Ambasala Rahane D/C
check dam 3 30 50.00 0.00 50.00 0.00 0.00 0.00
43 Biridi Drainage -do- Hansua
D/C
Imp. to Drainage Cut from Jaisol to
Hansua check dam 1 10 15.00 0.00 0.00 15.00 0.00 0.00
44 Biridi Drainage -do- Hansua
D/C
Imp. to Drainage Cut from Balia to
Jaisol check dam 1 10 10.00 10.00 0.00 0.00 0.00 0.00
District Irrigation Plan (DIP), Jagatsinghpur Page 87
45 Biridi Drainage -do- Hansua
D/C
Imp. to D/C from Tarikunda to
Banikunda check dam 1 10 10.00 0.00 10.00 0.00 0.00 0.00
46 Biridi Drainage -do- Hansua
D/C
Imp. to D/C from Batimira to
Mahatol check dam 1 10 15.00 0.00 0.00 0.00 15.00 0.00
47 Biridi Drainage -do- Gobari
D/C Imp. to Adhanga
Drainage Channel check dam 1 10 15.00 0.00 0.00 0.00 0.00 15.00
48 Naugaon Drainage -do- Gobari
D/C Imp. to Tampua
Drainage Channel check dam 2 20 25.00 25.00 0.00 0.00 0.00 0.00
49 Naugaon Drainage -do- Gobari
D/C Imp. to link drains
of Gobari D/S check dam 2 20 40.00 40.00 0.00 0.00 0.00 0.00
50 Naugaon Drainage -do- Gobari
D/C Imp. to Rohia
Drainage Channel check dam 1 10 10.00 0.00 10.00 0.00 0.00 0.00
51 Naugaon Drainage -do- Gobari
D/C Imp. to Andhuti
Drainage Channel check dam 9 90 150.00 0.00 0.00 100.00 50.00 0.00
52 Naugaon Drainage -do- Madhapu
r D/C
Imp. to Nandan (From 40.76 km
to 96.37 km) ( Jaipur to
Jatadhari Muhan)
check dam 1 10 10.00 0.00 10.00 0.00 0.00 0.00
53 Naugaon Drainage -do- Hansua
D/C
Imp. to Itang (From 40.76 km
to 96.37 km) ( Jaipur to
Jatadhari Muhan)
check dam 1 10 15.00 0.00 0.00 15.00 0.00 0.00
54 Naugaon Drainage -do- Gobari
D/C Imp. to
Dahanikhia D/C check dam 1 10 10.00 10.00 0.00 0.00 0.00 0.00
55 Naugaon Drainage -do- Devi river Imp. to Gobari
D/C check dam 9 90 225.00 125.00 100.00 0.00 0.00 0.00
56 Naugaon Drainage -do- Devi river Imp. to Bausajori
D/C check dam 5 50 125.00 0.00 0.00 125.00 0.00 0.00
57 Tirtol Drainage -do- Hansua
D/C
Imp. to Singarpur to Rankei
Drainage Channel check dam 4 40 70.00 0.00 0.00 0.00 70.00 0.00
58 Tirtol Drainage -do- Brudha
D/C Imp. to Chhapada
D/C check dam 1 10 10.00 0.00 0.00 0.00 0.00 10.00
District Irrigation Plan (DIP), Jagatsinghpur Page 88
59 Tirtol Drainage -do- Brudha
D/C Imp. to Jaipur D/C check dam 1 10 10.00 10.00 0.00 0.00 0.00 0.00
60 Tirtol Drainage -do- Brudha
D/C Imp. to Tirtol D/C check dam 1 10 10.00 0.00 10.00 0.00 0.00 0.00
61 Tirtol Drainage -do- Hansua
D/C Imp. to Sadhusahi
D/C check dam 1 10 10.00 0.00 0.00 10.00 0.00 0.00
62 Tirtol Drainage -do- Hansua
D/C Imp. to Athagotari
D/C check dam 1 10 10.00 0.00 0.00 0.00 10.00 0.00
63 Tirtol Drainage -do- Gobari
D/C Imp. to Madanpur
D/C check dam 1 10 10.00 0.00 0.00 0.00 10.00 0.00
64 Kujanga Drainage -do- Santara
D/C Imp. to Santara
D/C check dam 2 20 42.00 0.00 0.00 0.00 0.00 42.00
65 Kujanga Drainage -do- Santara
D/C Imp. to Balia D/C check dam 2 20 50.00 50.00 0.00 0.00 0.00 0.00
66 Kujanga Drainage -do- Mahanga
D/C
Imp. to Udayachandapur
D/C check dam 1 10 15.00 0.00 15.00 0.00 0.00 0.00
67 Kujanga Drainage -do- Mahanga
D/C Imp. to
Gadakujanga D/C check dam 1 10 10.00 0.00 0.00 10.00 0.00 0.00
68 Erasama Drainage -do- Mahanga
D/C
Imp. to Mahanga nallah and its
system check dam 27 270 500.00 200.00 200.00 100.00 0.00 0.00
69 Erasama Drainage -do- Alaka D/C
Imp. to link drains & Sub-drains of
Sankha and Kamalapaka D/S
check dam 6 60 140.00 0.00 0.00 0.00 140.00 0.00
70 Erasama Drainage -do- Hansua
D/C
Imp. to 10 nos. of drains in Erasama block in Doab No-
1
check dam 11 110 200.00 0.00 0.00 0.00 0.00 200.00
71 Erasama Drainage -do- Mahanga
D/C Imp. to Kanaguli
Khurant D/C check dam 1 10 15.00 15.00 0.00 0.00 0.00 0.00
72 Erasama Drainage -do- Adhanga
D/C Imp. to Tanra
Pokhariapada D/C check dam 2 20 30.00 0.00 30.00 0.00 0.00 0.00
73 Erasama Drainage -do- Tigiria
D/C Imp. to Telegunia
D/C check dam 2 20 40.00 0.00 0.00 40.00 0.00 0.00
74 Erasama Drainage -do- Brudha
D/C Imp. to Kantapada
Sundarkani D/C check dam 3 30 65.00 0.00 0.00 0.00 65.00 0.00
District Irrigation Plan (DIP), Jagatsinghpur Page 89
75 Erasama Drainage -do- Tigiria
D/C Imp. to
Gunthiapata D/C check dam 1 10 10.00 0.00 0.00 0.00 0.00 10.00
76 Erasama Drainage -do- Tigiria
D/C Imp. to Kiada D/C check dam 1 10 10.00 0.00 0.00 0.00 0.00 10.00
77 Erasama Drainage -do- Hansua
D/C Imp. to Barakolia
D/C check dam 1 10 10.00 0.00 0.00 0.00 10.00 0.00
78 Erasama Drainage -do- Tigiria
D/C Imp. to Sunadiha
D/C check dam 1 10 10.00 0.00 0.00 0.00 10.00 0.00
79 Erasama Drainage -do- Hansua
D/C Imp. to Hansua
D/C check dam 13 130 225.00 0.00 0.00 125.00 100.00 0.00
80 Erasama Drainage -do- Mahanga
D/C Imp. to Kuranta to
Balitutha D/C check dam 2 20 40.00 0.00 40.00 0.00 0.00 0.00
81 Erasama Drainage -do- Brudha
D/C Imp. to Basulei
nala check dam 3 30 60.00 0.00 60.00 0.00 0.00 0.00
82 Erasama Drainage -do- Brudha
D/C Imp. to Tigiria
nala check dam 3 30 60.00 0.00 60.00 0.00 0.00 0.00
83 Erasama Drainage -do- Adhanga
D/C Imp. to Nuapada
nala check dam 1 10 15.00 15.00 0.00 0.00 0.00 0.00
84 Erasama Drainage -do- Brudha
D/C Imp. to Brudha
D/C check dam 9 90 225.00 225.00 0.00 0.00 0.00 0.00
Total
Drainage Check Dam 249 2490 30 4487 1470 930 935 765 387
1 Jagatsinghpur
State Irrigation Departme
nt ( Cad Div.)
Har khet Ko
pani
Line Field
Channels
Mahanadi Delta Stage I
Construction of Field
Channels (MDS-I)
1 3248 5 1624.26 600 424 300 300.26 0
2 Raghunathpur
-do- -do- Mahanadi Delta
Stage I -do- 1 2788 4 1394.25 600 300 200 0 294.25
3 Balikuda -do- -do- -do- Mahanadi Delta
Stage I -do- 1 5180 5 2590.17 700 550 440 500 400.17
4 Biridi -do- -do- -do- Mahanadi Delta
Stage I
Construction of Field
Channels (MDS-I)
1 2837 5 1418.67 400 400 300 200 118.67
District Irrigation Plan (DIP), Jagatsinghpur Page 90
5 Naugaon -do- -do- -do- Mahanadi Delta
Stage I
Construction of Field
Channels (MDS-I)
1 1683 4 841.5 300 200 200 0 141.5
6 Tirtol -do- -do- -do- Mahanadi Delta
Stage I
Construction of Field
Channels (MDS-I)
1 1800 5 900.24 200 200 200 150 150.24
7 Kujanga -do- -do- -do- Mahanadi Delta
Stage I
Construction of Field
Channels (MDS-I)
1 207 2 103.95 50 53.95 0 0 0
8 Erasama -do- -do- -do- Mahanadi Delta
Stage I
Construction of Field
Channels (MDS-I)
1 1046 5 523.05 200 100 100 73.05 50
State Irrigation
Department ( Cad Div.) Line Field Channels
8 18789 35 9396.0
9 3050 2227.95 1740 1223.31
1154.83
1 Jagatsinghpur State
Irrigation
Department ( Cad Div.)
Har khet Ko
pani
Unlined Channels
Mahanadi Delta Stage I
Construction of Field
Channels (MDS-I)
1 197 1 98.44 98.44 0 0 0 0
2 Raghunathpur
-do- -do- -do- 1 169 1 84.5 84.5 0 0 0 0
3 Balikuda -do- -do- -do- -do- 1 314 3 156.98 0 0 50 50 56.98
4 Biridi -do- -do- -do- -do- 1 172 2 85.98 0 50 35.98 0 0
5 Naugaon -do- -do- -do- -do- -do- 1 102 2 51 0 0 25 26 0
6 Tirtol -do- -do- -do- -do- -do- 1 109 2 54.56 0 0 0 34.56 20
7 Kujanga -do- -do- -do- -do- -do- 1 13 1 6.3 6.3 0 0 0 0
8 Erasama -do- -do- -do- -do- -do- 1 63 2 31.7 16.7 15 0 0 0
State Irrigation
Department ( Cad Div.) Unlined
Channels 8 1139 14 569.46 205.94 65 110.98 110.56 76.98
Total ( Cad Div.) 16 19928 49 9965.55 3255.94 2292.95 1850.98 1333.87 1231.81
District Irrigation Plan (DIP), Jagatsinghpur Page 91
1 Jagatsinghpur
Lift Irrigation
Har khet Ko
pani
Lift Irrigation
LIP 50 nos of LIP 50 500 5 750 150 150 150 150 150
2 Raghunathpur
Lift Irrigation
Lift Irrigation
LIP 35 nos of LIP 35 350 5 525 105 105 105 105 105
3 Balikuda
Lift Irrigation
Lift Irrigation
LIP 50 nos of LIP 50 500 5 750 150 150 150 150 150
4 Biridi
Lift Irrigation
Lift Irrigation
LIP 65 nos of LIP 65 650 5 975 195 195 195 195 195
5 Naugaon
Lift Irrigation
Lift Irrigation
LIP 50 nos of LIP 50 500 5 750 150 150 150 150 150
6 Tirtol
Lift Irrigation
Lift Irrigation
LIP 60 nos of LIP 60 600 5 900 180 180 180 180 180
7 Kujanga
Lift Irrigation
Lift Irrigation
LIP 30 nos of LIP 30 300 5 450 90 90 90 90 90
8 Earasama
Lift Irrigation
Lift Irrigation
LIP 50 nos of LIP 50 500 5 750 150 150 150 150 150
Total Lift Irrigation 390 3900 5850 1170 1170 1170 1170 1170
Total HKK
P RRR 160 8472
20767.2
5344.94 5226.73 4170.9
9 3620.22 2404.3
Total HKK
P Check Dam 249 2490 4487 1470 930 935 765 387
Total HKK
P
Line Field Channels
8 18789 9396.0
9 3050 2227.95 1740 1223.31 1154.8
Total HKK
P
Unlined Channels
8 1139 569.46 205.94 65 110.98 110.56 76.98
Total HKK
P Lift Irrigation 390 3900 5850 1170 1170 1170 1170 1170
G.T HKK
P all 815 34790
41069.7
11240.88
9619.68 8126.9
7 6889.09 5193.1
District Irrigation Plan (DIP), Jagatsinghpur Page 92
1 Jagatsinghpur
Horticulture
Per drop mor
e crop (Mic
ro Irrigation)
Non -DPAP Drip
Drip Irrigation System ( Wide Spaced Crop
1 95 5 45.345 9.069 9.069 9.069 9.069 9.069
2 Jagatsinghpur
Horticulture
-do-
Drip Irrigation System (
ClosedSpaced Crop
1 137 5 129.408 25.8816 25.8816 25.8816 25.8816 25.8816
3 Raghunathpur
Horticulture
-do- Drip Irrigation System ( Wide Spaced Crop
1 47.5 5 22.6725 4.5345 4.5345 4.5345 4.5345 4.5345
4 Raghunathpur
Horticulture
-do-
Drip Irrigation System (
ClosedSpaced Crop
1 68.5 5 64.704 12.9408 12.9408 12.9408 12.9408 12.9408
5 Balikuda Horticulture
-do- Drip Irrigation System ( Wide Spaced Crop
1 71.25 5 34 6.8 6.8 6.8 6.8 6.8
6 Balikuda Horticulture
-do- -do-
Drip Irrigation System (
ClosedSpaced Crop
1 102.75 5 97.056 19.4112 19.4112 19.4112 19.4112 19.4112
7 Biridi Horticulture
-do- -do- Drip Irrigation System ( Wide Spaced Crop
1 47.5 5 22.67 4.534 4.534 4.534 4.534 4.534
8 Biridi Horticulture
-do- -do-
Drip Irrigation System (
ClosedSpaced Crop
1 68.5 5 64.704 12.9408 12.9408 12.9408 12.9408 12.9408
9 Naugaon Horticulture
-do- -do- Drip Irrigation System ( Wide Spaced Crop
1 38 5 18.138 3.6276 3.6276 3.6276 3.6276 3.6276
10 Naugaon Horticulture
-do- -do-
Drip Irrigation System (
ClosedSpaced Crop
1 54.8 5 51.763 10.3526 10.3526 10.3526 10.3526 10.3526
11 Tirtol Horticulture
-do- -do- Drip Irrigation System ( Wide Spaced Crop
1 71.25 5 34 6.8 6.8 6.8 6.8 6.8
District Irrigation Plan (DIP), Jagatsinghpur Page 93
12 Tirtol Horticulture
-do- -do-
Drip Irrigation System (
ClosedSpaced Crop
1 102.75 5 97.056 19.4112 19.4112 19.4112 19.4112 19.4112
13 Kujanga Horticulture
-do- -do- Drip Irrigation System ( Wide Spaced Crop
1 71.25 5 34 6.8 6.8 6.8 6.8 6.8
14 Kujanaga Horticulture
-do- -do-
Drip Irrigation System (
ClosedSpaced Crop
1 102.75 5 97.056 19.4112 19.4112 19.4112 19.4112 19.4112
15 Erasama Horticulture
-do- -do- Drip Irrigation System ( Wide Spaced Crop
1 33.25 5 15.87 3.174 3.174 3.174 3.174 3.174
16 Erasama Horticulture
-do- -do-
Drip Irrigation System (
ClosedSpaced Crop
1 47.95 5 45.292 9.0584 9.0584 9.0584 9.0584 9.0584
Total Horticulture 16 1160 873.73
45 174.746
9 174.747
174.747
174.747 174.75
1 Jagatsinghpur
Horticulture Per
drop mor
e crop (Mic
ro Irrigation)
Non -DPAP
Sprinkler
Micro Spinkler Irrigatin System
1 2 5 1.178 0.2356 0.2356 0.2356 0.2356 0.2356
2 Jagatsinghpur
Horticulture
-do- Portable Spinkler Irrigation System
1 120 5 23.52 4.704 4.704 4.704 4.704 4.704
3 Raghunathpur
Horticulture
-do- Micro Spinkler
Irrigatin System 1 1 5 0.589 0.1178 0.1178 0.1178 0.1178 0.1178
4 Raghunathpur
Horticulture
-do- Portable Spinkler Irrigation System
1 60 5 11.76 2.352 2.352 2.352 2.352 2.352
5 Balikuda Horticulture
-do- Micro Spinkler
Irrigatin System 1 1.5 5 0.8335 0.1667 0.1667 0.1667 0.1667 0.1667
District Irrigation Plan (DIP), Jagatsinghpur Page 94
6 Balikuda Horticulture
-do- Portable Spinkler Irrigation System
1 90 5 17.64 3.528 3.528 3.528 3.528 3.528
7 Biridi Horticulture
-do- -do- Micro Spinkler
Irrigatin System 1 1 5 0.589 0.1178 0.1178 0.1178 0.1178 0.1178
8 Biridi Horticulture
-do- -do- Portable Spinkler Irrigation System
1 60 5 11.76 2.352 2.352 2.352 2.352 2.352
9 Naugaon Horticulture
-do- -do- Micro Spinkler
Irrigatin System 1 0.8 5 0.4712 0.09424 0.09424 0.09424 0.09424 0.09424
10 Naugaon Horticulture
-do- -do- Portable Spinkler Irrigation System
1 48 5 9.408 1.8816 1.8816 1.8816 1.8816 1.8816
11 Tirtol Horticulture
-do- -do- Micro Spinkler
Irrigatin System 1 1.5 5 0.8835 0.1767 0.1767 0.1767 0.1767 0.1767
12 Tirtol Horticulture
-do- -do- Portable Spinkler Irrigation System
1 90 5 17.64 3.528 3.528 3.528 3.528 3.528
13 Kujanga Horticulture
-do- -do- Micro Spinkler
Irrigatin System 1 1.5 5 0.8835 0.1767 0.1767 0.1767 0.1767 0.1767
14 Kujanga Horticulture
-do- -do- Portable Spinkler Irrigation System
1 90 5 17.64 3.528 3.528 3.528 3.528 3.528
15 Erasama Horticulture
-do- -do- Micro Spinkler
Irrigatin System 1 0.7 5 0.4123 0.08246 0.08246 0.08246 0.08246 0.08246
16 Erasama Horticulture
-do- -do- Portable Spinkler Irrigation System
1 42 5 8.232 1.6464 1.6464 1.6464 1.6464 1.6464
Total Horticulture 16 610 123.44 24.688 24.688 24.688 24.688 24.688
District Irrigation Plan (DIP), Jagatsinghpur Page 95
1 Jagatsinghpur
Fishery
Per dro
p mor
e crop
Farm Pond
Farm Pond
New Construction of Farm
Pond
100 100 5 109.5 21.9 21.9 21.9 21.9 21.9
2 Raghunathpur
Fishery
Farm Pond
New Construction of Farm
Pond
100 100 5 109.5 21.9 21.9 21.9 21.9 21.9
3 Balikuda Fishery
Farm Pond
New Construction of Farm
Pond
100 100 5 109.5 21.9 21.9 21.9 21.9 21.9
4 Biridi Fishery
Farm Pond
New Construction of Farm
Pond
100 100 5 109.5 21.9 21.9 21.9 21.9 21.9
5 Naugaon Fishery
Farm Pond
New Construction of Farm
Pond
100 100 5 109.5 21.9 21.9 21.9 21.9 21.9
6 Tirtol Fishery
Farm Pond
New Construction of Farm
Pond
100 100 5 109.5 21.9 21.9 21.9 21.9 21.9
7 Kujanga Fishery
Farm Pond
New Construction of Farm
Pond
100 100 5 109.5 21.9 21.9 21.9 21.9 21.9
8 Erasama Fishery
Farm Pond
New Construction of Farm
Pond
100 100 5 109.5 21.9 21.9 21.9 21.9 21.9
9 Jagatsinghpur
Fishery
Pond Renovation 100 100 5 60 12 12 12 12 12
10 Raghunathpur
Fishery
Pond Renovation 100 100 5 60 12 12 12 12 12
11 Balikuda Fishery
Pond Renovation 100 100 5 60 12 12 12 12 12
District Irrigation Plan (DIP), Jagatsinghpur Page 96
12 Biridi Fishery
Pond Renovation 100 100 5 60 12 12 12 12 12
13 Naugaon Fishery
Pond Renovation 100 100 5 60 12 12 12 12 12
14 Tirtol Fishery
Pond Renovation 100 100 5 60 12 12 12 12 12
15 Kujanga Fishery
Pond Renovation 100 100 5 60 12 12 12 12 12
16 Erasama Fishery
Pond Renovation 100 100 5 60 12 12 12 12 12
Total Fishery 1600 1600 80 1356 271.2 271.2 271.2 271.2 271.2
1 Jagatsinghpur
Agriculture
Per dro
p mor
e crop
Water Lifting
Devices
Surface Lift from Pernial Source
150 150 5 150 30 30 30 30 30
2 Raghunathpur
-do- -do- -do-
150 150 5 150 30 30 30 30 30
3 Balikuda -do- -do- -do-
150 150 5 180 36 36 36 36 36
4 Biridi -do- -do- -do-
150 150 5 150 30 30 30 30 30
5 Naugaon -do- -do- -do-
150 150 5 150 30 30 30 30 30
6 Tirtol -do- -do- -do-
150 150 5 150 30 30 30 30 30
7 Kujanga -do- -do- -do-
150 150 5 150 30 30 30 30 30
8 Erasama -do- -do- -do-
150 150 5 240 48 48 48 48 48
Total Agriculture 1200 1200 1320 264 264 264 264 264
District Irrigation Plan (DIP), Jagatsinghpur Page 97
Total
PDM
C
Non -DPAP Drip
16 1160 873.73
45 174.746
9 174.747
174.747
174.747 174.75
PDM
C
Non -DPAP Sprinkler
16 610 123.44 24.688 24.688 24.688 24.688 24.688
PDM
C Farm Pond 1600 1600 1356 271.2 271.2 271.2 271.2 271.2
PDM
C
Water Lifting Devices
1200 1200 1320 264 264 264 264 264
Total
PDM
C all 2832 4570
3673.175
734.6349
734.635 734.63
5 734.635 734.63
1 Jagatsinghpur
Agril. Department ( Soil Conv..
)
PMKSY
Watershe
d
(RRR)Panchakani
a G.P Tank
Renovation Renovation 1 0 1 5 5 0 0 0 0
2 Jagatsinghpur
-do- -do-
(RRR) Ranga Patana Tank
Renovation Renovation 1 0 1 5 0 5 0 0 0
3 Jagatsinghpur
-do- -do- (RRR)
Gobara Tank
Renovation Renovation 1 0 1 10 0 0 0 10 0
4 Jagatsinghpur
-do- -do- (RRR)
Lingaswar Tank
Renovation Renovation 1 0 1 10 10 0 0 0 0
5 Jagatsinghpur
-do- -do- (RRR)Balapkhari
Renovation Renovation 1 0 1 10 10 0 0 0 0
6 Raghunathpur
-do- -do- (RRR) Jena
Pokhari Renovation Renovation 1 0 1 5 0 5 0 0 0
7 Balikuda -do- -do- (RRR)
G.P Tank Renovation Renovation 1 0 1 10 10 0 0 0 0
District Irrigation Plan (DIP), Jagatsinghpur Page 98
8 Naugaon -do- -do-
(RRR) Nuapokh
ari Community Tank
Renovation Renovation 1 0 1 5 5 0 0 0 0
9 Naugaon -do- -do- (RRR)Govt Tank, Bhatana
Renovation Renovation 1 0 1 10 0 10 0 0 0
10 Naugaon -do- -do-
(RRR) Tubi
Pokhari, Bhatapa
da
Renovation Renovation 1 0 1 5 5 0 0 0 0
11 Naugaon -do- -do-
(RRR) Sunthalo
West Side Tank
Renovation Renovation 1 0 1 5 0 0 5 0 0
12 Naugaon -do- -do-
(RRR) Badhi Sahi
Communiity Tank
Renovation Renovation 1 0 1 5 0 0 0 0 5
13 Erasama -do- -do- (RRR) Tank
Renovation Renovation 1 0 1 20 10 0 10 0 0
14 Jagatsinghpur
-do- -do- Farm Pond
6 nos of Farm Pond 6 nos of
Farm Pond 6 2.4 5 6 2 1 1 1 1
15 Raghunathpur
-do- -do- -do- 4 nos 4 nos 4 1.6 5 4 1 1 1 1 0
16 Biridi -do- -do- -do- 8 Nos 8 Nos 8 3.2 4 8 2 2 2 2 0
17 Tirtol -do- -do- -do- 4 nos 4 nos 4 1.6 4 4 1 1 1 1 0
18 Kujanaga -do- -do- -do- 6 nos of Farm Pond 6 nos of
Farm Pond 6 2.4 5 6 2 1 1 1 1
19 Erasama -do- -do- -do- 9 Nos 9 Nos 9 3.6 5 9 2 2 2 2 1
District Irrigation Plan (DIP), Jagatsinghpur Page 99
20 Balikuda -do- -do- Community Tank Community
Tank 1 2 2 20 0 0 0 10 10
21 Balikuda -do- -do- Community Tank Community
Tank 1 2 1 10 10 0 0 0 0
22 Raghunathpur
-do- -do- Gully Control Gully Control 1 0 1 4 4 0 0 0 0
23 Balikuda -do- -do- Jora Diversion Weir Cum
Sluice Gate
Diversion Weir Cum Sluice Gate
1 0 1 20 0 20 0 0 0
24 Balikuda -do- -do- Jora Diversion Weir Cum
Sluice Gate
Diversion Weir Cum Sluice Gate
1 0 1 15 0 0 15 0 0
25 Balikuda -do- -do- Runoff Managed
Structure
Runoff Managed Structure
1 0 1 25 25 0 0 0 0
26 Balikuda -do- -do- Runoff Managed
Structure
Runoff Managed Structure
1 0 1 10 0 0 10 0 0
27 Naugaon -do- -do- Arioda Ghari
Bandha
Runoff Managed Structure
Runoff Managed Structure
1 0 1 10 0 0 0 0 10
28 Naugaon -do- -do-
Sikhar Dihakul
to Baisima
nia Gheri Bandh
Runoff Managed Structure
Runoff Managed Structure
1 0 2 15 10 5 0 0 0
29 Naugaon -do- -do- Drainage Clearance
Erada
Drainage Clearance
Erada 1 0 1 5 0 0 0 5 0
Total RRR 60 18.8 53 276 114 53 48 33 28
1 Jagatsinghpur
Agril. Department ( Soil Conv..
)
PMKSY
Watershe
d
Gharibandha
Check Dam Check Dam 1 10 1 4 4 0 0 0 0
District Irrigation Plan (DIP), Jagatsinghpur Page 100
2 Jagatsinghpur
-do- -do- Ghariban
dha Check Dam Check Dam 1 10 1 4 4 0 0 0 0
3 Jagatsinghpur
-do- -do- Ghariban
dha Check Dam Check Dam 1 10 1 5 0 0 5 0 0
4 Jagatsinghpur
-do- -do- Check Dam Check Dam 1 10 1 4 0 0 0 4 0
5 Balikuda -do- -do- Nagapur
Jori Check Dam Check Dam 1 10 1 22 22 0 0 0 0
6 Balikuda -do- -do- Check Dam Check Dam 1 10 2 4 2 2 0 0 0
7 Naugaon -do- -do- Bhatana
Nala Check Dam Check Dam 1 10 1 10 10 0 0 0 0
8 Naugaon -do- -do- Gobari
Nala Check Dam Check Dam 1 10 1 10 0 10 0 0 0
9 Naugaon -do- -do-
Naugaon Jora
Ganda to Alana Nala
Check Dam Check Dam 1 10 1 10 0 0 10 0 0
10 Naugaon -do- -do- Bhaba Chandi
Jora Check Dam Check Dam 1 10 1 5 0 0 0 5 0
11 Naugaon -do- -do- Check Dam Check Dam 1 10 1 5 0 0 5 0 0
12 Kujanaga -do- -do- Potnai Check Dam Check Dam 1 10 1 5 5 0 0 0 0
13 Erasama -do- -do- Dhalipon
ga Check Dam Check Dam 1 10 1 5 5 0 0 0 0
14 Erasama -do- -do- Check Dam Check Dam 1 10 1 5 0 5 0 0 0
Total Check Dam 14 140 15 98 52 17 20 9 0
Total Watershed
RRR 60 18.8 53 276 114 53 48 33 28
Total Watershed
Check Dam 14 140 15 98 52 17 20 9 0
District Irrigation Plan (DIP), Jagatsinghpur Page 101
Total Watershed
all 74 158.8 68 374 166 70 68 42 28
1 Jagatsinghpur
State Irrigation Department ( Irr.
Dvn. Jspur.)
State
Plan
(RRR) Major
Irrigation/
Machhagaon Canal
Renovation of Disty No.10
Renovation, Linning,
Earth work & Concrete
work
1 184 5 100.00 20.00 20.00 20.00 20.00 20.00
2 Jagatsinghpur
-do- -do- -do- Renovation of Disty. No 10-F
Renovation, Linning,
Earth work & Concrete
work
1 55 3 30.00 0.00 10.00 10.00 10.00 0.00
3 Jagatsinghpur
-do- -do- -do- Renovation of
Disty. No 10-FA -do- 1 55 3 30.00 10.00 10.00 10.00 0.00 0.00
4 Jagatsinghpur
-do- -do- -do- Renovation of
Lahanga Minor
Earth work & Concrete
work 1 37 2 20.00 10.00 10.00 0.00 0.00 0.00
5 Jagatsinghpur
-do- -do- -do- Renovation of
Disty. No 10-BA
Renovation, Linning &
R/S & Renovation of outlets &
Drainage syphon
1 55 2 30.00 20.00 10.00 0.00 0.00 0.00
6 Jagatsinghpur
-do- -do- -do- Renovation of
Disty. No 19 & its system
Concrete 1 184 4 100.00 25.00 25.00 25.00 0.00 25.00
7 Jagatsinghpur
-do- -do- -do- Renovation of Disty. No 19 B
Earth work & Concrete
work 1 74 4 40.00 10.00 10.00 10.00 10.00 0.00
District Irrigation Plan (DIP), Jagatsinghpur Page 102
8 Jagatsinghpur
-do- -do- -do- Renovation of
Sagadhua minor
Renovation, Linning,
Earth work & Concrete
work
1 74 4 40.00 10.00 10.00 10.00 0.00 10.00
9 Jagatsinghpur
-do- -do- -do- Renovation of Kendal Minor
Earth work & Concrete
work 1 74 5 40.00 8.00 8.00 8.00 8.00 8.00
10 Jagatsinghpur
-do- -do- -do- Renovation of
Jahanpur Minor
Renovation, Linning,
Earth work & Concrete
work
1 75 4 41.00 11.00 10.00 10.00 10.00 0.00
11 Jagatsinghpur
-do- -do- -do- Renovation of Disty. No 19-D
Renovation, Linning,
Earth work & Concrete
work
1 92 5 50.00 10.00 10.00 10.00 10.00 10.00
12 Jagatsinghpur
-do- -do- -do- Renovation Disty.
Noof 19-E
Renovation, Linning,
Earth work & Concrete
work
1 92 5 50.00 10.00 10.00 10.00 10.00 10.00
13 Raghunathpur
-do- -do- -do- Renovation of 7 &
its system
Earth work & Concrete
work 1 184 5 100.00 20.00 20.00 20.00 20.00 20.00
14 Raghunathpur
-do- -do- -do- Renovation of
Disty No.8 & its system
Earth work & Concrete
work 1 147 5 80.00 15.00 15.00 15.00 15.00 20.00
15 Raghunathpur
-do- -do- -do- Renovation of
Disty No.9 & its system
Earth work & Concrete
work 1 166 5 90.00 15.00 15.00 15.00 15.00 30.00
16 Raghunathpur
-do- -do- -do-
Renovation of Ichhapur Minor,
Ala minor , Murunia Minor,
Puja Minor
Earth work & Concrete
work 1 114 5 62.00 10.00 10.00 15.00 15.00 12.00
District Irrigation Plan (DIP), Jagatsinghpur Page 103
17 Raghunathpur
-do- -do- -do-
Renovation of Radhanga Minor,
Radhanga Extension, Jira
Minor
Renovation, Linning,
Earth work & Concrete
work
1 92 5 50.00 10.00 10.00 10.00 10.00 10.00
18 Balikuda -do- -do- -do- Renovation of Disty. No 13-C
Renovation, Linning,
Earth work & Concrete
work
1 74 3 40.00 15.00 15.00 10.00 0.00 0.00
19 Balikuda -do- -do- -do- Renovation of
Disty No.13
Renovation, Linning,
Earth work & Concrete
work
1 74 3 40.00 15.00 15.00 10.00 0.00 0.00
20 Balikuda -do- -do- -do- Renovation of Disty. No 13-D
Renovation, Linning,
Earth work & Concrete
work
1 74 3 40.00 15.00 15.00 10.00 0.00 0.00
21 Balikuda -do- -do- -do- Renovation of Disty. No 13-E
Renovation, Linning,
Earth work & Concrete
work
1 55 5 30.00 6.00 6.00 6.00 6.00 6.00
22 Balikuda -do- -do- -do- Renovation of
Disty No.15
Renovation, Linning,
Earth work & Concrete
work
1 92 3 50.00 15.00 15.00 20.00 0.00 0.00
23 Balikuda -do- -do- -do- Renovation of Disty. No 15-A
Renovation, linning of
canal & C.C. guard wall
1 110 5 60.00 12.00 12.00 12.00 12.00 12.00
24 Balikuda -do- -do- -do- Renovation of Disty. No 13-B
Renovation, Linning,
Earth work & Concrete
work
1 110 5 60.00 12.00 12.00 12.00 12.00 12.00
District Irrigation Plan (DIP), Jagatsinghpur Page 104
25 Balikuda -do- -do- -do- Renovation of
Disty. no 14
Renovation, Structure
work 1 92 3 50.00 15.00 15.00 20.00 0.00 0.00
26 Balikuda -do- -do- -do- Renovation of Titira Minor
Earth work & Concrete
work 1 55 5 30.00 6.00 6.00 6.00 6.00 6.00
27 Balikuda -do- -do- -do- Renovation of
Disty. No 15-A1
Renovation, Linning,
Earth work & Concrete
work
1 55 3 30.00 12.00 9.00 9.00 0.00 0.00
28 Balikuda -do- -do- -do- Renovation of Disty. No 16-B
Renovation, Linning,
Earth work & Concrete
work
1 92 5 50.00 10.00 10.00 10.00 10.00 10.00
29 Balikuda -do- -do- -do- Renovation of Disty No.15-C
Renovation, Linning,
Earth work & Concrete
work
1 110 5 60.00 12.00 12.00 12.00 12.00 12.00
30 Balikuda -do- -do- -do- Renovation of Disty. No 13-F
Renovation, Linning,
Earth work & Concrete
work
1 74 5 40.00 8.00 8.00 8.00 8.00 8.00
31 Balikuda -do- -do- -do- Renovation of
Sadeipur Minor
Renovation, Linning,
Earth work & Concrete
work
1 74 3 40.00 0.00 15.00 15.00 10.00 0.00
32 Balikuda -do- -do- -do- Renovation of Benupur Sub-
minor
Renovation, Linning,
Earth work & Concrete
work
1 46 5 25.00 5.00 5.00 5.00 5.00 5.00
District Irrigation Plan (DIP), Jagatsinghpur Page 105
33 Balikuda -do- -do- -do- Renovation of Dalana Minor
Renovation, Linning,
Earth work & Concrete
work
1 92 5 50.00 10.00 10.00 10.00 10.00 10.00
34 Balikuda -do- -do- -do- Renovation of
Debahata Minor
Earth work & Concrete
work 1 55 5 30.00 6.00 6.00 6.00 6.00 6.00
35 Balikuda -do- -do- -do- Renovation of Dadara Minor
Earth work & Concrete
work 1 55 5 30.00 6.00 6.00 6.00 6.00 6.00
36 Balikuda -do- -do- -do- Renovation of Kharamanga
Minor
Earth work & Concrete
work 1 37 3 20.00 6.00 6.00 8.00 0.00 0.00
37 Balikuda -do- -do- -do- Renovation of
Mulugaon minor
Earth work & Concrete
work 1 55 5 30.00 6.00 6.00 6.00 6.00 6.00
38 Balikuda -do- -do- -do- Renovation of Digoda Minor
Renovation, Linning,
Earth work & Concrete
work
1 64 5 35.00 6.00 6.00 6.00 6.00 11.00
39 Balikuda -do- -do- -do- Renovation of
Kania Sub minor
Renovation, Linning,
Earth work & Concrete
work
1 55 5 30.00 6.00 6.00 6.00 6.00 6.00
40 Balikuda -do- -do- -do- Renovation of
Alavar Sub minor
Renovation, Linning,
Earth work & Concrete
work
1 18 1 10.00 10.00 0.00 0.00 0.00 0.00
41 Balikuda -do- -do- -do- Renovation of Iswarpur Sub
minor
Renovation, , Earth work &
Concrete work
1 18 1 10.00 10.00 0.00 0.00 0.00 0.00
District Irrigation Plan (DIP), Jagatsinghpur Page 106
42 Balikuda -do- -do- -do- Renovation of Mathasahi sub
minor
Renovation, , Earth work &
Concrete work
1 37 2 20.00 10.00 10.00 0.00 0.00 0.00
43 Balikuda -do- -do- -do- Renovation of Ghodadihasub
minor
Renovation, , Earth work &
Concrete work
1 18 1 10.00 10.00 0.00 0.00 0.00 0.00
44 Balikuda -do- -do- -do- Renovation of
Basantasub minor
Renovation, , Earth work &
Concrete work
1 18 1 10.00 0.00 10.00 0.00 0.00 0.00
45 Balikuda -do- -do- -do- Renovation of
Mandakeswarsub minor
Renovation, , Earth work &
Concrete work
1 18 1 10.00 0.00 10.00 0.00 0.00 0.00
46 Balikuda -do- -do- -do- Renovation of Mathasahi sub
minor
Renovation, , Earth work &
Concrete work
1 18 1 10.00 10.00 0.00 0.00 0.00 0.00
47 Balikuda -do- -do- -do- Renovation of
Ramtol sub minor
Renovation, , Earth work &
Concrete work
1 18 1 10.00 10.00 0.00 0.00 0.00 0.00
48 Balikuda -do- -do- -do- Renovation of Dua
Sub minor
-do-
1 18 1 10.00 10.00 0.00 0.00 0.00 0.00
49 Balikuda -do- -do- -do- Renovation of
badaradanga Sub minor
Renovation, Linning,
Earth work & Concrete
work
1 44 4 24.00 0.00 6.00 6.00 6.00 6.00
District Irrigation Plan (DIP), Jagatsinghpur Page 107
50 Balikuda -do- -do- -do- Renovation of Minjapada Sub
Minor
Renovation, Linning,
Earth work & Concrete
work
1 57 5 31.00 6.00 6.00 6.00 6.00 7.00
51 Biridi -do- -do- -do- Renovation of
Bagalpur Disty.
Renovation, linning,
Earth work & Concrete
work
1 221 5 120.00 20.00 25.00 25.00 25.00 25.00
52 Biridi -do- -do- -do- Renovation of Bombilo Disty.
Renovation, linning,
Earth work & Concrete
work
1 147 5 80.00 10.00 10.00 20.00 20.00 20.00
53 Biridi -do- -do- -do- Renovation of Disty No.5 B
Renovation, linning,
Earth work & Concrete
work
1 147 5 80.00 10.00 10.00 10.00 20.00 30.00
54 Biridi -do- -do- -do- Renovation of Chasikhanda
Minor
Renovation, linning,
Earth work & Concrete
work
1 110 5 60.00 10.00 10.00 10.00 20.00 10.00
55 Biridi -do- -do- -do- Renovation of
Khandatira Sub minor
Renovation, linning,
Earth work & Concrete
work
1 81 5 44.00 10.00 10.00 10.00 10.00 4.00
56 Biridi -do- -do- -do- Renovation
ofDisty No.4A
Renovation, linning,
Earth work & Concrete
work
1 110 5 60.00 10.00 10.00 20.00 10.00 10.00
District Irrigation Plan (DIP), Jagatsinghpur Page 108
57 Biridi -do- -do- -do- Renovation of Bagula Minor
Renovation, Linning &
R/S & Renovation of outlets &
Drainage syphon
1 110 5 60.00 10.00 10.00 10.00 10.00 20.00
58 Naugaon -do- -do- -do- Renovation of Disty No.19 A2
Renovation, Linning,
Earth work & Concrete
work
1 24 1 13.00 13.00 0.00 0.00 0.00 0.00
59 Naugaon -do- -do- -do- Renovation of
Disty No.16
Renovation, Earth work & Concrete
work
1 24 1 13.00 13.00 0.00 0.00 0.00 0.00
60 Naugaon -do- -do- -do- Renovation of
Dgajarajpur Minor
Renovation, Earth work & Concrete
work
1 9 1 5.00 0.00 0.00 5.00 0.00 0.00
61 Naugaon -do- -do- -do- Renovation of Bajapur Sub
minor
Renovation, Earth work & Concrete
work
1 9 1 5.00 0.00 0.00 0.00 5.00 0.00
62 Naugaon -do- -do- -do- Renovation of Mundala Sub
minor
Renovation, Earth work & Concrete
work
1 9 1 5.00 0.00 0.00 0.00 0.00 5.00
63 Naugaon -do- -do- -do- Renovation of
Kumari Sub minor
Renovation, Earth work & Concrete
work
1 9 1 5.00 0.00 5.00 0.00 0.00 0.00
64 Naugaon -do- -do- -do- Renovation of
kundeswar S/M
Renovation, Earth work & Concrete
work
1 9 1 5.00 5.00 0.00 0.00 0.00 0.00
District Irrigation Plan (DIP), Jagatsinghpur Page 109
65 Naugaon -do- -do- -do- Renovation of
Bhoda S/M
Renovation, Earth work & Concrete
work
1 9 1 5.00 5.00 0.00 0.00 0.00 0.00
66 Naugaon -do- -do- -do- Renovation of
nandigram Sub minor
Renovation, Earth work & Concrete
work
1 9 1 5.00 5.00 0.00 0.00 0.00 0.00
67 Naugaon -do- -do- -do- Renovation of sansailo Sub
minor
Renovation, Earth work & Concrete
work
1 9 1 5.00 5.00 0.00 0.00 0.00 0.00
68 Naugaon -do- -do- -do- Renovation of Rohia Minor
Renovation, Earth work & Concrete
work
1 9 1 5.00 5.00 0.00 0.00 0.00 0.00
69 Naugaon -do- -do- -do- Renovation of Chakuli Minor
Renovation, Earth work & Concrete
work
1 18 1 10.00 10.00 0.00 0.00 0.00 0.00
70 Naugaon -do- -do- -do- Renovation of Disty no. 16-A
Renovation, Linning,
Earth work & Concrete
work
1 18 2 10.00 5.00 5.00 0.00 0.00 0.00
71 Naugaon -do- -do- -do- Renovation of Disty. No 16-B
Renovation, Linning,
Earth work & Concrete
work
1 18 1 10.00 0.00 10.00 0.00 0.00 0.00
72 Naugaon -do- -do- -do- Renovation of
Disty. No 19-A2
Renovation, Linning,
Earth work & Concrete
work
1 9 1 5.00 5.00 0.00 0.00 0.00 0.00
73 Naugaon -do- -do- -do- Renovation of Chadheigaon
Minor
-do-
1 9 1 5.00 5.00 0.00 0.00 0.00 0.00
District Irrigation Plan (DIP), Jagatsinghpur Page 110
74 Naugaon -do- -do- -do- Renovation of
Disty No.19-A2A
Renovation, Linning,
Earth work & Concrete
work
1 9 1 5.00 5.00 0.00 0.00 0.00 0.00
75 Naugaon -do- -do- -do-
Renovation of Disty No.19-A2A1 and construction
of Guard wall
Renovation, Linning,
Earth work & Concrete
work
1 11 1 6.00 6.00 0.00 0.00 0.00 0.00
76 Tirol -do- -do- -do- Renovation of Disty No.10-H
Earth work & Concrete
work 1 46 2 25.00 10.00 0 0.00 0.00 15.00
77 Tirol -do- -do- -do- Renovation of Disty No.10-K
Earth work & Concrete
work 1 46 2 25.00 10.00 15.00 0.00 0.00
78 Tirol -do- -do- -do- Renovation of Disty. No 10-M
Renovation, Linning,
Earth work & Concrete
work
1 37 2 20.00 0.00 0.00 0.00 10.00 10.00
79 Tirol -do- -do- -do- Renovation of
Gobindapokhori Minor
Earth work & Concrete
work 1 37 2 20.00 10.00 0 0.00 10.00 0.00
80 Tirol -do- -do- -do- Renovation of
Arijaga sub minor
Earth work & Concrete
work 1 46 2 25.00 10.00 0 10.00 5.00 0.00
81 Tirol -do- -do- -do- Renovation of sanara Minor
Earth work & Concrete
work 1 46 3 25.00 10.00 0 5.00 10.00 0.00
82 Tirol -do- -do- -do- Renovation of
salampurMinor
Earth work & Concrete
work 1 37 1 20.00 0.00 20.00 0.00 0.00 0.00
83 Tirol -do- -do- -do- Renovation of
RasalpurMinor
Earth work & Concrete
work 1 37 1 20.00 0.00 20.00 0.00 0.00 0.00
84 Tirol -do- -do- -do- Renovation of Birtol Minor
Earth work & Concrete
work 1 37 2 20.00 10.00 0 10.00 0.00 0.00
District Irrigation Plan (DIP), Jagatsinghpur Page 111
85 Tirol -do- -do- -do- Renovation of
Disty No.10-Lp
Earth work & Concrete
work 1 37 2 20.00 0 10.00 10.00 0.00 0.00
86 Balikuda -do- -do- -do-
Renovation of Alijanga Sub-minor from RD 0.600 Km to 1.830 Km with
C.C. guard wall from RD 0.650 Km to
0.850 Km.
Renovation, linning of
canal & C.C. guard wall
1 110 5 60.00 12.00 12.00 12.00 12.00 12.00
87 Balikuda -do- -do- -do-
Renovation of Titira Minor from RD
0.500 Km to 3.900 Km and
Construction of Guard wall
Renovation, Linning,
Earth work & Concrete
work
1 110 5 60.00 12.00 12.00 12.00 12.00 12.00
88 Balikuda -do- -do- -do-
Construction of VRB-cum-Surplus
Escape at RD 52.200 Km of machhagaon
canal over Dead Alaka.
Renovation, Structure
work 1 166 5 90.00 15.00 15.00 15.00 20.00 25.00
89 Balikuda -do- -do- -do-
Renovation of Iswarpur Sub-minor
from RD 00 Km to 1.00 Km and
Construction of guard wall from RD 00 Km to 0.300 Km.
Earth work & Concrete
work 1 55 5 30.00 6.00 6.00 6.00 6.00 6.00
90 Balikuda -do- -do- -do-
Renovation of Angarua Minor from
RD 4.500 Km to 5.733 Km & Bhoda Sub-minor from RD 0.545 Km to 1.450
Km & Kalio Sub-minor from RD
2.400 Km to 3.580 Km.
Renovation, Linning,
Earth work & Concrete
work
1 110 5 60.00 12.00 12.00 12.00 12.00 12.00
District Irrigation Plan (DIP), Jagatsinghpur Page 112
91 Balikuda -do- -do- -do-
Construction of Drainage syphone at
RD 0.354 Km with construction of
guard wall from RD 15 mtr to 200 Mtr & RD 980 Mtr to 1100
Mtr of Minjapada Sub-minor.
Renovation, Linning,
Earth work & Concrete
work
1 92 5 50.00 10.00 10.00 10.00 10.00 10.00
92 Balikuda -do- -do- -do-
Renovation of Disty No.15-A1 from RD 1.00 Km to 3.673
Km including construction of guard wall near village Kosida.
Renovation, Linning,
Earth work & Concrete
work
1 110 5 60.00 12.00 12.00 12.00 12.00 12.00
93 Balikuda -do- -do- -do-
Renovation of Mathasahi Sub-minor from RD
0.350 Km to 0.947 Km & Construction of 2 Nos of outlets.
Renovation, Linning,
Earth work & Concrete
work
1 74 5 40.00 8.00 8.00 8.00 8.00 8.00
94 Balikuda -do- -do- -do-
Renovation of Disty No.15-C from RD 3.00 Km to 6.126
Km.
Renovation, Linning,
Earth work & Concrete
work
1 147 5 80.00 15.00 15.00 15.00 15.00 20.00
95 Balikuda -do- -do- -do-
Renovation of Dua Sub-minor from RD 0.500 Km to 1.340
Km including construction of
guard wall from RD 0.500 Km to 0.800
Km.
Renovation, Linning,
Earth work & Concrete
work
1 46 5 25.00 5.00 5.00 5.00 5.00 5.00
96 Balikuda -do- -do- -do-
Renovation of Disty No.15-B from RD 2.00 Km to 6.086
Km & Mandakeswar Sub-minor from RD
1.50 Km to 2.011 Km.
Renovation, Linning,
Earth work & Concrete
work
1 110 5 60.00 12.00 12.00 12.00 12.00 12.00
District Irrigation Plan (DIP), Jagatsinghpur Page 113
97 Balikuda -do- -do- -do- Renovation of Disty
No.13-C
Earth work & Concrete
work 1 55 5 30.00 6.00 6.00 6.00 6.00 6.00
98 Balikuda -do- -do- -do- Renovation of
Benupur Sub-minor
Earth work & Concrete
work 1 55 5 30.00 6.00 6.00 6.00 6.00 6.00
99 Balikuda -do- -do- -do- Renovation of
Sadeipur Sub-minor
Earth work & Concrete
work 1 55 5 30.00 6.00 6.00 6.00 6.00 6.00
100 Balikuda -do- -do- -do- Renovation of
Sanakala minor
Earth work & Concrete
work 1 55 5 30.00 6.00 6.00 6.00 6.00 6.00
101 Balikuda -do- -do- -do-
Renovation of Iswarpur Sub-minor from RD 0.100 Km to 0.940 Km and construction of
Guard wall
Renovation, Linning,
Earth work & Concrete
work
1 64 5 35.00 6.00 6.00 6.00 6.00 11.00
102 Balikuda -do- -do- -do-
Renovation of Kalio Sub-minor from RD 1.500 Km to 3.580
Km and construction of
Guard wall
Renovation, Linning,
Earth work & Concrete
work
1 55 5 30.00 6.00 6.00 6.00 6.00 6.00
103 Balikuda -do- -do- -do-
Renovation of Disty No.13-B from RD
2.100 Km to 4.980 Km and
construction of Guard wall
Renovation, Linning,
Earth work & Concrete
work
1 55 5 30.00 6.00 6.00 6.00 6.00 6.00
104 Balikuda -do- -do- -do-
Renovation of Ghodadhiha Sub-minor from RD
0.500 Km to 1.820 Km and
construction of Guard wall
Renovation, Linning,
Earth work & Concrete
work
1 55 5 30.00 6.00 6.00 6.00 6.00 6.00
105 Balikuda -do- -do- -do-
Renovation of Sansailo Sub-minor from RD 0.400 Km
to 1.710 Km.
Renovation, Linning,
Earth work & Concrete
work
1 64 5 35.00 6.00 6.00 6.00 6.00 11.00
District Irrigation Plan (DIP), Jagatsinghpur Page 114
106 Balikuda -do- -do- -do-
Renovation of Arijanga Sub-minor with construction of
Guard wall
Renovation, Linning,
Earth work & Concrete
work
1 57 5 31.00 6.00 6.00 6.00 6.00 7.00
107 Biridi -do- -do- -do- Renovation ofDisty
No.2 & its sytem
Renovation, linning, Earth
work & Concrete
work
1 79 4 43.00 10.00 10.00 11.00 12.00 0.00
108 Biridi -do- -do- -do-
Renovation ofHazipur minor &
its system with Bagula Minor
Renovation, linning, Earth
work & Concrete
work
1 74 4 40.00 10.00 10.00 10.00 10.00 0.00
109 Biridi -do- -do- -do- Renovation ofDisty No.3 & its system
Renovation, linning, Earth
work & Concrete
work
1 55 4 30.00 10.00 10.00 10.00 0.00 0.00
110 Biridi -do- -do- -do- Renovation ofDisty No.4 & its system
Renovation, linning, Earth
work & Concrete
work
1 55 4 30.00 10.00 10.00 10.00 0.00 0.00
111 Biridi -do- -do- -do- Renovation ofDisty No.5 & its system
Renovation, linning, Earth
work & Concrete
work
1 64 4 35.00 10.00 10.00 10.00 5.00 0.00
112 Biridi -do- -do- -do- Renovation ofDisty No.6 & its system
Renovation, linning, Earth
work & Concrete
work
1 64 4 35.00 10.00 10.00 10.00 5.00 0.00
113 Biridi -do- -do- -do- Renovation of Gaichara right
Minor
Renovation, Linning &
R/S & Renovation of outlets &
Drainage syphon
1 74 5 40.00 8.00 8.00 8.00 8.00 8.00
District Irrigation Plan (DIP), Jagatsinghpur Page 115
114 Biridi -do- -do- -do- Renovation of
Gaichara left Minor
Renovation, Linning &
R/S & Renovation of outlets &
Drainage syphon
1 64 5 35.00 7.00 7.00 7.00 7.00 7.00
115 Biridi -do- -do- -do- Renovation of
Khajara Right Minor
Renovation, Linning &
R/S & Renovation of outlets &
Drainage syphon
1 74 5 40.00 8.00 8.00 8.00 8.00 8.00
116 Biridi -do- -do- -do- Renovation of
Khajara left Minor
Renovation, Linning &
R/S & Renovation of outlets &
Drainage syphon
1 55 3 30.00 10.00 10.00 10.00 0.00 0.00
117 Biridi -do- -do- -do- Renovation of
Chasikhanda Minor
Renovation, Linning &
R/S & Renovation of outlets &
Drainage syphon
1 37 4 20.00 5.00 5.00 5.00 5.00 0.00
118 Biridi -do- -do- -do- Renovation of
Biluakhai canal syphone
Renovation, Linning &
R/S & Renovation of outlets &
Drainage syphon
1 55 4 30.00 7.00 8.00 7.00 8.00 0.00
119 Biridi -do- -do- -do- Renovation of
Kamalpur Minor
Renovation, Linning &
R/S & Renovation of outlets &
Drainage syphon
1 40 5 22.00 5.00 5.00 5.00 5.00 2.00
District Irrigation Plan (DIP), Jagatsinghpur Page 116
120 Biridi -do- -do- -do- Renovation of
Gelapur right minor & Gelapur left minor
Renovation, Linning &
R/S & Renovation of outlets &
Drainage syphon
1 44 5 24.00 4.00 4.00 4.00 6.00 6.00
121 Biridi -do- -do- -do- Renovation of Bambilo Disty
Renovation, Linning &
R/S & Renovation of outlets &
Drainage syphon
1 64 5 35.00 7.00 7.00 7.00 7.00 7.00
122 Biridi -do- -do- -do- Renovation of
Basandara Minor
Renovation, Linning &
R/S & Renovation of outlets &
Drainage syphon
1 55 3 30.00 10.00 10.00 10.00 0.00 0.00
123 Biridi -do- -do- -do-
Renovation of Parisankharisahi
Minor & Parbatipur Minor including
guard wall
Renovation, Linning,
Earth work & Concrete
work
1 55 3 30.00 10.00 10.00 10.00 0.00 0.00
124 Biridi -do- -do- -do- Renovation of
Ukundara Minor including guard wall
Renovation, Linning,
Earth work & Concrete
work
1 55 3 30.00 10.00 10.00 10.00 0.00 0.00
125 Naugaon -do- -do- -do-
Renovation of Disty No.19 from RD
20.00 Km to 31.050 Km.
Renovation, Linning,
Earth work & Concrete
work
1 28 3 15.00 5.00 5.00 5.00 0.00 0.00
126 Naugaon -do- -do- -do- Renovation of Disty
No.19-E.
Renovation, Linning,
Earth work & Concrete
work
1 33 3 18.00 6.00 6.00 6.00 0.00 0.00
District Irrigation Plan (DIP), Jagatsinghpur Page 117
127 Naugaon -do- -do- -do- Renovation of Disty
no. 19-A2A
Renovation, Linning,
Earth work & Concrete
work
1 28 3 15.00 5.00 5.00 5.00 0.00 0.00
128 Naugaon -do- -do- -do-
Renovation of Chakuli minor,
Arakhakuda minor & Rohia minor
Renovation, Linning,
Earth work & Concrete
work
1 22 2 12.00 0.00 0.00 6.00 6.00 0.00
129 Naugaon -do- -do- -do-
Renovation of Gajarajpur minor and Construction of Guard
Wall.
Renovation, Linning,
Earth work & Concrete
work
1 22 2 12.00 0.00 0.00 6.00 6.00 0.00
130 Naugaon -do- -do- -do-
Renovation of Disty No.16-A from RD
3.500 Km to 9.555 Km and construction of
Guard wall
Renovation, Linning,
Earth work & Concrete
work
1 28 3 15.00 5.00 5.00 5.00 0.00 0.00
131 Naugaon -do- -do- -do-
Renovation of Disty No.16-B from RD 3.500
Km to 7.160 Km and construction of Guard
wall
Renovation, Linning,
Earth work & Concrete
work
1 28 3 15.00 5.00 5.00 5.00 0.00 0.00
132 Naugaon -do- -do- -do-
Renovation of Disty No.19-A2A1 and
construction of Guard wall
Renovation, Linning,
Earth work & Concrete
work
1 11 1 6.00 6.00 0.00 0.00 0.00 0.00
133 Naugaon -do- -do- -do-
Renovation of Kundeswar Sub-minor from RD 0.450 Km to
1.443 Km and construction of Guard
wall
Renovation, Linning,
Earth work & Concrete
work
1 22 2 12.00 6.00 6.00 0.00 0.00 0.00
134 Naugaon -do- -do- -do-
Renovation of Nandigram Sub-minor from RD
0.500 Km to 1.640 Km and
construction of Guard wall
Renovation, Linning,
Earth work & Concrete
work
1 37 4 20.00 5.00 5.00 5.00 5.00 0.00
District Irrigation Plan (DIP), Jagatsinghpur Page 118
135 Tirtol -do- -do- -do-
Renovation of Disty No.10-H with
construction of Guard wall
Earth work & Concrete
work 1 92 5 50.00 10.00 10.00 10.00 10.00 10.00
136 Tirtol -do- -do- -do- Renovation of Disty
No.10-K
Earth work & Concrete
work 1 92 5 50.00 10.00 10.00 10.00 10.00 10.00
137 Tirtol -do- -do- -do-
Renovation of Radhanga Extention
with repair of outlets.
Renovation, Linning,
Earth work & Concrete
work
1 98 5 53.00 10.00 10.00 10.00 10.00 13.00
138 Tirtol -do- -do- -do-
Renovation of Disty No.10-P with
construction of Guard wall & VRB
Earth work & Concrete
work 1 101 5 55.00 10.00 10.00 10.00 10.00 15.00
139 Tirtol -do- -do- -do-
Renovation of Disty No.10-L with
construction of Guard wall
Earth work & Concrete
work 1 83 5 45.00 9.00 9.00 9.00 9.00 9.00
Total State
Irrigation Department ( Irr. Dvn. Jspur.)
139 8688 4722 1143 1058 991 777 753
1 Raghunathpur
State Irrigation
Department ( Irr. Div.
Mahandi
South)
State
Plan
(RRR) Major
Irrigation
Taladanda Canal
Canals system / Disty. Minor & S/M
Repair, restoration & Renovation
1 7360 5 4000 800 800 800 800 800
2 Balikuda -do- -do- -do- Canals system /
Disty. Minor & S/M
Repair, restoration & Renovation
1 9.2 1 5 5 0 0 0 0
3 Tirtol -do- -do- -do- Canals system /
Disty. Minor & S/M
Repair, restoration & Renovation
1 7360 5 4000 800 800 800 800 800
District Irrigation Plan (DIP), Jagatsinghpur Page 119
4 Kujanga -do- -do- -do- Canals system /
Disty. Minor & S/M
Repair, restoration & Renovation
1 5520 5 3000 600 600 600 600 600
5 Erasama -do- -do- -do- Canals system /
Disty. Minor & S/M
Repair, restoration & Renovation
1 1472 2 800 500 300 0 0 0
Total
State Irrigation
Department ( Irr. Div. Mahandi
South)
5 21721 11805 2705 2500 2200 2200 2200
1 Tirtol
Irrigation
'Department ( Irr. Div.
Mahandi
Barrage)
State
Plan
(RRR) Major
Irrigation
Renovation of Mahanadi Left Branch Canal
Earth work and concrete
lining 1 110 2 60.00 30 30 0 0 0
2 Tirtol -do- -do- -do-
Renovation of Posala Minor and
Sub-Minor of Mahanadi Left Branch Canal
Earth work and const. of
concrete guard wall
1 37 1 20.00 20 0 0 0 0
3 Tirtol -do- -do- -do-
Renovation of Damodarpur Minor
of Mahanadi Left Branch Canal
Earth work and const. of
concrete guard wall,
outlets
1 74 3 40.00 20 10 10 0 0
4 Tirtol -do- -do- -do-
Renovation of Nuagaon Minor of
Mahanadi Left Branch Canal
Earth work and const. of
concrete guard wall,
outlets
1 64 1 35.00 0 35 0 0 0
5 Tirtol -do- -do- -do-
Renovation of Olagada Minor of MLD under MCII
Project
Resectioning, and Const. of through wall
1 28 1 15.00 0 0 15 0 0
District Irrigation Plan (DIP), Jagatsinghpur Page 120
6 Tirtol -do- -do- -do-
Renovation of Poragadei Minor of
MLD under MCII Project
Resectioning, and Const. of through wall
1 18 1 10.00 0 0 10 0 0
7 Tirtol -do- -do- -do-
Renovation of Khosalpur Minor of
MLD under MCII Project
Resectioning, and Const. of through wall
1 18 1 10.00 0 0 10 0 0
8 Tirtol -do- -do- -do- Renovation of
Kanimul Minor of MLBC
Earth work and const. of
concrete guard wall,
outlets
1 55 2 30.00 15 15 0 0 0
9 Tirtol -do- -do- -do- Renovation of
Paruna Minor-I of MLBC
Earth work and const. of
concrete guard wall,
outlets
1 55 2 30.00 0 0 15 15 0
10 Tirtol -do- -do- -do- Renovation of
Mirzapur Minor of PRD
Earth work and const. of
concrete guard wall,
outlets
1 28 1 15.00 0 0 0 15 0
11 Tirtol -do- -do- -do- Renovation to Jogonia Minor
1 18 1 10.00 0 0 0 0 10
12 Tirtol -do- -do- -do-
Renovation to Paika Right Distributary from RD 12km to
17km
Resectioning, Const. of
guard wall near weak
zone
1 55 1 30.00 0 0 30 0 0
13 Tirtol -do- -do- -do-
Renovation to Damodarpur Minor of M.L.B.C from RD
00 to Tail
Resectioning, Const. of
guard wall near weak
zone
1 55 1 30.00 0 0 0 0 30
14 Tirtol -do- -do- -do- Renovation to Kolta Minor-I and Minor-
II from RD 00 to Tail
Resectioning, Const. of
guard wall near weak
zone
1 74 2 40.00 20 20 0 0 0
15 Kujanga -do- -do- -do- Renovation of Mahanadi Left Distributary
Resectioning, and concrete
lining 1 74 2 40.00 20 20 0 0 0
District Irrigation Plan (DIP), Jagatsinghpur Page 121
16 Kujanga -do- -do- -do-
Renovation of Mahanadi Left
Distributary from RD 5km to 6.5km
Resectioning, Const. of
guard wall near weak
zone
1 64 2 35.00 20 15 0 0 0
17 Kujanga -do- -do- -do-
Renovation of Mahanadi Left
Distributary from RD 6.5km to 8km
Resectioning, Const. of
guard wall near weak
zone
1 55 2 30.00 0 0 15 15 0
18 Kujanga -do- -do- -do- Renovation to sarali
minor
Resectioning, Const. of
guard wall near weak
zone
1 28 1 15.00 0 0 0 0 15
19 Kujanga -do- -do- -do- Renovation to
Sampur minor-I
Resectioning, Const. of
guard wall near weak
zone
1 18 1 10.00 0 0 0 10 0
20 Kujanga -do- -do- -do- Renovation to
Sampur minor-II
Resectioning, Const. of
guard wall near weak
zone
1 28 1 15.00 0 0 15 0 0
21 Kujanga -do- -do- -do-
Renovation to Paika Right Distributary from RD 17 km to
Tail
Resectioning, Const. of
guard wall near weak
zone
1 28 1 15.00 0 0 15 0 0
Total Major Irrigation 21 984 535.00 145.00 145.00 135.00 55.00 55.00
Total State plan RRR 17062 3993 3703 3326 3032 3008
1 Jagatsinghpur
Agriculture
NA
BA
RD
Ground Water
Private Lift Irrigation
Project
Creation of New Shallow Tube well
1500 1500 5 600 120 120 120 120 120
2 Raghunathpur
Agriculture
Ground Water
Private Lift Irrigation
Project -do- 1500 1500 5 600 120 120 120 120 120
District Irrigation Plan (DIP), Jagatsinghpur Page 122
3 Biridi Agriculture
Ground Water
Private Lift Irrigation
Project
Creation of New Shallow Tube well
1500 1500 5 600 120 120 120 120 120
4 Naugaon Agriculture
Ground Water
Private Lift Irrigation
Project
Creation of New Shallow Tube well
1500 1500 5 600 120 120 120 120 120
Total NABARD
6000
6000 2400 480 480 480 480 480
1 Jagatsinghpur
Fishery
MG
NR
EG
S
Multy Purpose
Farm Pond
Farm Pond
New Construction of Farm
Pond
80 32 4 80 20 20 20 20 0
2 Raghunathpur
Fishery
Farm Pond
New Construction of Farm
Pond
80 32 4 80 20 20 20 20 0
3
Balikuda Fishery
Farm Pond
New Construction of Farm
Pond
80 32 4 80 20 20 20 20 0
4
Biridi Fishery
Farm Pond
New Construction of Farm
Pond
80 32 4 80 20 20 20 20 0
5
Naugaon Fishery
Farm Pond
New Construction of Farm
Pond
80 32 4 80 20 20 20 0 20
6
Tirtol Fishery
Farm Pond
New Construction of Farm
Pond
80 32 4 80 20 20 20 0 20
District Irrigation Plan (DIP), Jagatsinghpur Page 123
7
Kujanga Fishery
Farm Pond
New Construction of Farm
Pond
80 32 4 80 20 20 20 0 20
8
Erasama Fishery
Farm Pond
New Construction of Farm
Pond
80 32 4 80 20 20 20 0 20
1 Jagatsinghpur
Fishery
Pond
Pond Renovatio
n 40 16 4 40 10 10 10 10 0
2 Raghunathpur
Fishery
Pond Renovatio
n 40 16 4 40 10 10 10 10 0
3 Balikuda
Fishery
Pond Renovatio
n 40 16 4 40 10 10 10 10 0
4 Biridi
Fishery
Pond Renovatio
n 40 16 4 40 10 10 10 10 0
5 Naugaon
Fishery
Pond Renovatio
n 40 16 4 40 10 10 10 0 10
6 Tirtol
Fishery
Pond Renovatio
n 40 16 4 40 10 10 10 0 10
7 Kujanga
Fishery
Pond Renovatio
n 40 16 4 40 10 10 10 0 10
8 Erasama
Fishery
Pond Renovatio
n 40 32 4 80 20 20 20 0 20
Total MGNREGS 960 400 1000 250 250 250 120 130
1 EAP Mediun MCII 1 67 3 1336 500 500 336 0 0
Total EAP 1 67 1336 500 500 336 0 0
Grand Total 66914.8
7 17364.51
15357.31
13321.60
11297.72
9573.71
District Irrigation Plan (DIP), Jagatsinghpur Page 124
ABSTRACT Financial Plan for 5years & Long Term. (In Lakhs) Irrigation Potential to be Created (in Ha)
Activity 5years 20years PMKSY AIBP 0
PMKSY AIBP 0 0
PMKSY-other components
HKKP 6390
PMKSY-other components
HKKP
RRR 20767.15 PDMC 2800
Check Dam 4487 WD 140
Line Field Channels 9396.09 Total 9330
Unlined Channels 569.46
State plan
EAP (Medium) 67
Lift Irrigation 5850 MGNREGS 400
Total 41069.7 NABARD 6000
PDMC
Non -DPAP Drip 873.7345 Total 6467
Non -DPAP Sprinkler 123.44 G.Total 15797
Farm Pond 1356 Extension,Strengthening & Restoration of Ayacut(Ha)
Water Lifting Devices 1320
HKKP
RRR 8472
Total 3673.1745 Lined channel 18789
WD
RRR 276 Unlined Channels 1139
Check Dam 98 Total 28400
Total 374 Watershed Renovation 18.8
PMKSY Total 45116.8745 G. Total 28418.8
State plan
Major RRR 17062
NABARD Ground Water (PLIP) 2400 DRIP & Sprinkler Irrigation(Ha)
MGNREGS Farm Pond 1000 PDMC Non-DPAP Drip 1160
EAP Mediun 1336 Non-DPAP Sprinkler 610
State Plan Total 21798
G.Total 66914.8745 400000 Total 1770
District Irrigation Plan (DIP), Jagatsinghpur Page 125
Summary
Jagatsinghpur district has geographical area of 1,65,970 ha. It is one of the most
natural disaster-prone districts of costal Odisha. This District consists of 08 Blocks and
falls under East and South Eastern Coastal Plain agro-ecological zone having normal
annual rainfall of 1514.60 mm in 66 numbers of rainy days. Rice and pulses (green
gram and black gram) is the main crop of this district during Kharif and rabi season
respectively. Due to erratic distribution of rainfall, more than 80% rainfall occurs during
monsoon season only. Hence kharif irrigated area in around 70%. But during rabi
season, maximum area remains fallow or irrigation is not provided to pulse due to non
availability of required amount of water to the crops. Hence the production and
productivity of rabi crops is very low in the district. Only 35% areas are being irrigated in
rabi season. The District is also surrounded by River system the Mahanadi and Paika in
North and Devi in the South West. Due to its geographical situation, the district is
congenial and prone to occurrence of various natural calamities like flood or cyclone or
drought in almost every year. Water logging is the constraint during Kharif due to poor
drainage facilities. The domestic, livestock, irrigation and industrial requirement of water
for the district is 2.50 BCM. But at present only 1.64 BCM of water is available from
both surface and groundwater resources. By end of 2020 the requirement may increase
to 2.85 BCM. Hence, an additional 1.21 BCM of water potential need to be created by
2020. The block wise strategic planning under this scheme is explained in this
document. Planning is made for different projects at an estimated cost of Rs. 669 Crore
to increase the irrigation potential by 15797 ha along with improving the available
facilities. This will increase the provision of irrigation from the present level of 53% to
70%. A long term action plan (for 20 years) is also proposed to develop a major
irrigation project with estimated cost of Rs. 4000 Crore.
District Irrigation Plan (DIP), Jagatsinghpur Page 126
For more information please contact:
Collector & District Magistrate
At/Po/Dist: Jagatsinghpur, PIN-754103
Phone: 06724-220379,
Fax: 06724-220299
Email: [email protected]