DEPARTEMENT BEDRYFS- EN SISTEEMINGENIEURSWESE DEPARTMENT OF INDUSTRIAL AND SYSTEMS ENGINEERING COVER PAGE FOR FINAL PROJECT DOCUMENT(BPJ 420) - 2012 Information with regards to the mini-dissertation Project Title: (e.g. A Contingency framework for the after-sales inventory at Nissans Part Distribution Centre) Facility Plan for Unilever Author (Last name, Initials) Mbatha W.P Student number 26481121 Supervisor/s (Last name, Initials) Kruger P.S Date (month/day/year) September-05-2012 Keywords (Provide keywords from your project (for searching purposes). The first word of two words must always have a capital first letter and the rest of the words following must be lower case. In the event of an abbreviation, use as it is known. E.g. Economic recession, ABSA, ERP, Simulation modelling) Unilever Facilities Plan, Project Waterfall Abstract (Provide an abstract of the mini-dissertation. An abstract is a short summary of the contents covered in the item.) Using systems dynamics and facilities planning principles to overcome inventory planning and Flow design for a fast moving goods factory. Category (Enter the category in which the project was done. E.g. Operations Research, Simulation, Logistics…) Facilities Planning, Industrial Analysis Declaration 1. I understand what plagiarism is and I am aware of the University's policy in this regard. 2. I declare that this is my own original work 3. Where other people's work has been used (either from a printed source, internet or any other source) this has been carefully acknowledged and referenced in accordance with departmental requirements 4. I have not used another student's past work to hand in as my own 5. I have not allowed and will not allow, anyone to copy my work with the intention of handing it in as his/her own work Handtekening Signature

Transcript of COVER PAGE FOR FINAL PROJECT DOCUMENT(BPJ 420)

DEPARTEMENT BEDRYFS- EN SISTEEMINGENIEURSWESE DEPARTMENT OF INDUSTRIAL AND SYSTEMS ENGINEERING

COVER PAGE FOR FINAL PROJECT DOCUMENT(BPJ 420) - 2012

Information with regards to the mini-dissertation Project Title: (e.g. A Contingency framework for the after-sales inventory at Nissans Part Distribution Centre)

Facility Plan for Unilever

Author (Last name, Initials) Mbatha W.P Student number 26481121 Supervisor/s (Last name, Initials) Kruger P.S Date (month/day/year) September-05-2012 Keywords (Provide keywords from your project (for searching purposes). The first word of two words must always have a capital first letter and the rest of the words following must be lower case. In the event of an abbreviation, use as it is known. E.g. Economic recession, ABSA, ERP, Simulation modelling)

Unilever Facilities Plan, Project Waterfall

Abstract (Provide an abstract of the mini-dissertation. An abstract is a short summary of the contents covered in the item.)

Using systems dynamics and facilities planning principles to overcome inventory planning and Flow design for a fast moving goods factory.

Category (Enter the category in which the project was done. E.g. Operations Research, Simulation, Logistics…)

Facilities Planning, Industrial Analysis

Declaration 1. I understand what plagiarism is and I am aware of the University's policy in this regard. 2. I declare that this is my own original work 3. Where other people's work has been used (either from a printed source, internet or any other source) this has been carefully acknowledged and referenced in accordance with departmental requirements 4. I have not used another student's past work to hand in as my own 5. I have not allowed and will not allow, anyone to copy my work with the intention of handing it in as his/her own work Handtekening Signature

A Facility and Work Flow design for Unilever

by

Wiseman P. Mbatha 26481121

Submittedinpartialfulfilmentoftherequirementsfor thedegreeof

BACHELORSOFINDUSTRIALENGINEERING

inthe

FACULTYOFENGINEERING,BUILTENVIRONMENTANDINFORMATION TECHNOLOGY

UNIVERSITYOF PRETORIA

October 2012

Executive Summary

The main aim of this document is to serve as a design recommendation and a recorded documentation for the tactical decisions that had to be made when designing the factory. The report also serves as a design guide line for future projects that will be done by Unilever. The document was created by a student from the University of Pretoria as part of his final year project.

An appendix with the designs and simulation models will be attached at the end of the document. When developing the designs the student had to do research on best practices available in the industry this was done by consulting companies, going on reliable internet sources recommended by the departments’ library and reading articles relating to the subject.

The major challenge that was faced throughout the project is that decisions are made as the project progresses but using industrial and systems engineering a reliable team of people the project progressed without major design problems. The key to the success of the project is that the company keeps record of most of their work which makes it easier to retrieve information when needed.

Table of Contents Executive Summary .................................................................................................................. i 

Table of Figures ....................................................................................................................... v 

1  Introduction ...................................................................................................................... 1 

2  Project Description ........................................................................................................... 2 

3  Expected Project Outcomes ............................................................................................ 3 

First Outcome ...................................................................................................................... 3 

4  Interim Report findings summary and review .................................................................. 4 

4.1  Purchasing Extra piece of land ................................................................................. 4 

4.2  Layout Options ......................................................................................................... 5 

5  Literature Review ............................................................................................................. 6 

General ................................................................................................................................ 6 

Efficient operation ................................................................................................................ 7 

Picking best practices .......................................................................................................... 7 

5.1  Material handling equipment .................................................................................... 9 

5.1.1  Material handling trends in 2012 ....................................................................... 9 

5.2  Forklift power sources ............................................................................................ 11 

5.2.1  Electric forklift considerations .......................................................................... 11 

5.2.2  Gas versus Electric Folklifts ............................................................................ 12 

5.2.3  Hydrogen forklifts ............................................................................................ 13 

5.3  Forklift types ........................................................................................................... 13 

5.3.1  Hand operated forklifts .................................................................................... 13 

5.3.2  High-level forklifts ............................................................................................ 14 

5.3.3  Heavy duty forklifts .......................................................................................... 14 

5.3.4  Narrow isle trucks ............................................................................................ 14 

5.3.5  Forklift type comparison .................................................................................. 15 

5.4  Automated storage ................................................................................................. 15 

5.5  Storage equipment ................................................................................................. 16 

5.5.1  Racking options ............................................................................................... 16 

5.6  Conclusion on Literature Review ............................................................................ 16 

5.7  Key inbound considerations ................................................................................... 17 

5.8  Key outbound considerations ................................................................................. 17 

6  Design Approach ........................................................................................................... 18 

7  Inbound Material Flow ................................................................................................... 19 

Inbound process flow ........................................................................................................ 24 

8  Systems Dynamics Factory model ................................................................................ 28 

8.1  Modelling approach ................................................................................................ 29 

8.2  Analysis parameters of the model .......................................................................... 30 

8.3  Inventory Calculations ............................................................................................ 31 

8.3.1  Loading bay space requirement for white bottles ............................................ 31 

8.3.2  Loading bay space requirement for Lavender Bottle inventory ....................... 32 

8.3.3  Rack space requirement ................................................................................. 33 

8.3.4  Packaging Cases Inventory ............................................................................. 34 

8.3.5  Raw Material Inventory .................................................................................... 35 

8.3.6  Total Number of Pallets in the warehouse ...................................................... 36 

8.3.7  Analysis of the results ..................................................................................... 36 

8.3.8  Empty pallets and waste management ........................................................... 37 

8.3.9  Analysis of results ........................................................................................... 37 

8.4  Warehouse layout options ...................................................................................... 38 

8.4.1  Storage design considerations ........................................................................ 38 

8.4.2  Requirements for receiving ............................................................................. 38 

8.4.3  The block layout .............................................................................................. 38 

8.4.4  The proposed warehouse layout ..................................................................... 39 

8.4.5  Warehouse with loading bays ......................................................................... 40 

8.5  Labelling the Racking System ................................................................................ 41 

8.5.1  Raw material allocation ................................................................................... 44 

9  Processing and Packaging of material .......................................................................... 46 

9.1.1  Packaging Process description ....................................................................... 46 

9.1.2  Handy Andy Making Process Description ....................................................... 48 

9.1.3  Allocation of Packaging lines ........................................................................... 49 

9.1.4  Pouch line 1 ..................................................................................................... 50 

9.1.5  Sunlight Bottle line ........................................................................................... 51 

9.1.6  Domestos and Omo ........................................................................................ 52 

9.1.7  Handy Andy line .............................................................................................. 54 

9.1.8  Fabric Softener ................................................................................................ 55 

9.1.9  Challenge ........................................................................................................ 56 

9.2  Product Rework Handling ....................................................................................... 58 

9.3  Space and Ergonomic Requirements ..................................................................... 58 

10  Outbound Material Flow ............................................................................................. 59 

10.1  Finished Goods inventory Graph ............................................................................ 62 

10.2  Finished Goods warehouse .................................................................................... 63 

10.2.2  Available layout options ................................................................................... 63 

10.3  Palletizing principles ............................................................................................... 64 

11  Conclusion and Recommendations ........................................................................... 65 

11.1  Final recommendations .......................................................................................... 65 

12  References ................................................................................................................. 66 

13  Appendix A ................................................................................................................. 67 

13.1  Tree diagram .......................................................................................................... 67 

13.2  Analytical Hearachy Process .................................................................................. 68 

14  Appendix B ................................................................................................................. 71 

15  Appendix B ................................................................................................................. 72 

15.1  Inventory Model ...................................................................................................... 72 

15.2  Appendix C ............................................................................................................. 76 

16  Appendix D ................................................................................................................. 77 

Table of Figures Figure 1: Unilever Boksburg ................................................................................................... 1 Figure 2: Boksburg Current Liquids factory ............................................................................ 2 Figure 3: Alternative layouts ................................................................................................... 5 Figure 4: Combined inbound flow analysis ........................................................................... 27 Figure 5: Systems Engineering Model .................................................................................. 28 Figure 6: Simulation approach .............................................................................................. 29 Figure 7: Causal relationship diagram .................................................................................. 30 Figure 8: Stock and flow diagram ......................................................................................... 30 Figure 9: White bottle inventory ............................................................................................ 31 Figure 10: Lavender Bottle inventory .................................................................................... 32 Figure 11: Wrapping Plastic and Caps inventory .................................................................. 33 Figure 12:Cases Inventory .................................................................................................... 34 Figure 13: Raw material inventory ........................................................................................ 35 Figure 14: Total raw material inventory ................................................................................. 35 Figure 15: Total material inventory ....................................................................................... 36 Figure 16:Empty Pallet inventory .......................................................................................... 37 Figure 17: Original Fishbone Warehouse Layout ................................................................. 39 Figure 18: Fishbone Warehouse Layout ............................................................................... 40 Figure 19: Material Allocation Criterions ............................................................................... 41 Figure 20: Packaging Process .............................................................................................. 47 Figure 21:Shelf allocation strategy ........................................................................................ 49 Figure 22: Handy Andy and Sunlight Pouches ..................................................................... 50 Figure 23: Sunlight Bottle ...................................................................................................... 51 Figure 24: Domestos and Omo Bleach Bottles ..................................................................... 52 Figure 25: Handy Andy ......................................................................................................... 54 Figure 26: Sunlight Fabric softener ....................................................................................... 55 Figure 27 .............................................................................................................................. 68 Figure 28 .............................................................................................................................. 68 Figure 29 .............................................................................................................................. 69 Figure 30 .............................................................................................................................. 69 Figure 31 .............................................................................................................................. 69 Figure 32 .............................................................................................................................. 70 

BPJ 4210 Octo

1 Int

UnileveConsumbrands employoffices a

Unilevebrand, aUnilevecleansinmarket 

The comroots enapproxibrand d

0 Final Projober 2012

troductio

er South Afrmer Goods cthat range yees all overand five ma

er’s strengthalthough oter operates ng, margarileader in se

mpany’s pronable it to fimately€89developmen

ject Docum

on

rica (Pty Ltdcompanies ifrom tea, hr the world,anufacturing

h is its brandthers such ain nine prodne, deodoraeven of the

oduct develfine‐tune th1m spent ont.

ment

), a subsidiain the Southhomecare to, in South Ag locations 

ds and its pas Omo, Luxduct categoants, housese categori

opment anhese to Soutn R&D wor

Figure

ary of Unileh Africa. Tho skin care pAfrica Unilevin South Af

people; withx, Lipton, Olories – laundehold care, tes.

d market exth African nldwide. Con

e 1: Unilever Bo

ever PLC, is oe Companyproducts. Uver has empfrica.

h Sunlight asla and Knordry, savourytea, hair car

xpertise areneeds. Annunsumer rese

oksburg

one of the ly is over 100nilever PLCployees base

s Unilever’srr are also hy and dressre and ice c

e global, whually, Unilevearch also p

P

argest Fast0 years old, C has many ed across tw

s biggest selousehold nsings, skincacream – and

hile strong lover invests plays a vital 

Page | 1

Moving with 

wo 

lling names. are and d is the 

ocal 

role in 

BPJ 4210 Octo

2 PrThe aimexistingfactrorieThese factroriepowderfactory Margar

The facin this locationstoragewill mak

0 Final Projober 2012

roject Dem of the projg factory whes which aare Foodses has differs factory pr

produces ine.

ctory that wireport beca

n and use e. The new ke it simple

ject Docum

escriptionject is to de

hich is locateare seperates, Powderserent produroduces pothe well k

ill be redesiause managthe currentfactroy will to move th

ment

n esign a factoed in Boskbed based os and the Lucts that a

owdered soaknown mar

igned is thegement hast factory asbe locatede current st

Figure 2: Boks

ory for Unileburg. The Bon the prodLiquids mare manufacap with brargarine ban

e Liquids facs decided ts warehous within a 5 tuff to the ne

sburg Current L

ever. The neBoksburg facducts that nufacturingctured in dnds like Omnds such a

ctory and wto move these storage km radius few location

Liquids factory

ew factory wctory is currare produc factories.

different promo, Surf anas Rama,

will be the sue liquids faspace for pfrom the cu.

P

will be baserently runninced in that Each of th

oduction linnd Skip. The

Stork and

ubject of disactory to a packaging urrent factor

Page | 2

ed on an ng three factory.

he three es. The e Foods Rondo

scussion different material ry which

BPJ 4210 Octo

3 Ex

First O

The firsto map map thesupplieminimuThis wilbe a deholding Secon

The seclayout Plannineach prline or idea is factory minimisthe fact Third The thirpalletisilocatedbest opsizing a

0 Final Projober 2012

xpected P

Outcome

st expected the incomin

e location or. Any supm storage ll also incluetailed plan required to

nd Outcom

cond outcomand erg

ng/Productiorocessing pside/mixer to have a and to un

sing stock htory to ensu

Outcomerd and final ing, into the next door t

ption for tranand layout o

ject Docum

Project Ou

outcome ong supply cof the supplpplier ownerequired fode bulk raw

n for Raw Mo ensure th

me

me is detailgonomics on/Process plant/packin

side storagcomplete mnderstand tholding whileure the mo

e outcome is

e onsite FG to the currensferring FGof the FG wa

ment

utcomes

of the projecchain for eacier, the and

ed storage r each raw

w material aMaterial (RMhe RM and

ling the flowwithin th

is requiredg plant. Inc

ge is requirmap for eacthe holdinge ensuring

ost efficient

s to detail thwarehousent factory –

G to DHL). Tarehouse.

ct is to worch raw and

d to state thwhich can

material toand the manM) and Pac

PM wareh

w of RM andhe factor, in orderto

cluded in thered and spech raw matg requirem100 % avaiflow of RM

he flow of pae and finally– An investigTo ensure e

rk with planpackaging

e reliability/n help us to ensure sunagement ockaging Matouse and b

d PM into try.To do

map out the second oecify the amterial from sents at eailability of m

M and PM t

acked finishy through to gation will hergonomic, e

ning and sumaterial. T

/risk factor ato minimise

ustained suof trucks on terial (PM) bulk tanks a

he factory tthis an

he flow of eautcome is t

mount of spsupplier to ach locationmaterial. Ophroughout

hed goods (DHL at Joz

have to be defficient flow

P

upply manaThe aim is toassociated e on site pply to the site. An oustorage as

are correctl

to optimise n Interfaceach raw mato determinpace requirpoint of usn with the

ptimise the lthe entire p

FG) througzi Park (whido to check w and the c

Page | 3

agement o clearly with the storage, factory.

utput will well as ly sized.

the flow e with aterial to e where red. The se in the

aim of ayout of process.

h ichis the

correct

BPJ 4210 Octo

4 IntThis sewhich wproject subsect

4.1 PAs highevaluatof land followinThe treappend

# A

1Extra po

land (10

2Staff enalternatentranc

3 Truck en

4 Car park

5

Rain waharvestiwaste wtreatme

6Truck pawaiting 

7 Tank Far

8 Utility

0 Final Projober 2012

terim Reection will cowas the firsapproach wtions are a

Purchasinh investmened properlyto modify t

ng table sumee diagram dix.

rea Locatio

ortion of 

0,000 m2)SW boun

trance/ tive e

SW corne

ntranceEastern boundary

kSouthernboundary

ter  ing and water ent  

SE corner

ark area

SE bound

rmNorthernboundary

NW corneplant

ject Docum

eport findoncentrate st section pwas to undesummary o

ng Extra pnts have puy before its athe shape ommarises thwhich was

on

daryAdditional sitAllows maximfuture expans

er

Separates statrafficReduces traffExtra entranceconstruction tfuture expans

y

Allows truck sroad, thus no Entrance far acomplaints)

n y

Separates car areaLikelihood charea not propFlexible enouFrancis road ifDuring constrlow impact, abe demolishe

r

Lowest point feed opportuOverflow of rcan go into att

dary Next to main 

n y

Located at higOffloading areof the tank faconditions)Within close pAllows linear Lower risk of respect to fire

er of Centrally loca(shared utiliti

ment

dings sumon recappi

phase of therstand the

of the sugge

piece of laut in the facacted uponof the land he supportin to motivat

Advantage

te accessmum utilisation of lasionff and visitors from 

ic congestion on Frae can be used to septraffic from site trafsionstaging/entering oncouncil objectionsaway from residence

traffic from operat

ange of location limosed for future planugh to allow access ff requireduction car park will llowing existing bued as late as possibl

within site, therefonitywh and if required tenuation dam

truck entrance

ghest point within tea is along the entirrm (flexible offload

proximity of the pofutrue expansion (Eimpacting the plante and spillages

ated for future PC exies)

mmary ang on the c

he project. A structure o

estions mad

and cility design, a suggestto be squa

ng reasonine changing

and for  Additio

truck 

ancis Roadparate ffic for 

Additiorequire

n a private 

e (noise  Possible

ional plant 

mited as nsfrom 

have a ildings to e

ore gravity 

overflow Treatedpumped

he sitere length ding 

rcess plantE to W)t with 

It's not tprocess

xpansion Not opt(can be to HCL p

and revieconclusionsAs was sta

of the plant e during ph

n it is very ion was ma

are, the sugng which sug the shape

Disadvantage

nal initial CAPEX re

nal security monitod

e congestion of Jozi

d water needs to be d back to the plant

the closest positions plant

timal for current HCcentrally located clpoint of use)

ew s made fromated in the from to bot

hase one of

critical thatade to purchggestion waupports the e of the site

quiredBest opporaccording t

oring  Operationaadditional 

i ParkThe disadvallowing tradjacent to

See advant

The usablecurrent sizelimited useits location

See advant

n to the 

With the curequiremethe processi) SpplitingNE corner oii) Split levwhich will for truck turoad  to thelevel to tan

L phase osest  Decision w

expansion

P

m the interiminterim rep

ttom. The ff the project

t every dechase an extas investigabuying of t

e is include

Justification

rtunity to acquire lato Waterfall require

al advantages outwesecurity monitoring

antage can be mitigruck staging on Wateo the main entrance

tages

e area in SE corner fie requirements. The for the main plantn/size 

tage

urrent tank farm siznts, it cannot be plas plant without:g between current loof buildingels on eastern edgecause additonal areurning due to the grae RM/PM store (roank farm offloading r

was made in light of 

Page | 4

m report port, the following t

cision be tra piece ated; the he land.

ed in the

nd & re‐zone ements.

eigh g

gaed by erfall site e (slip road)

ts the is area has t area due to 

e aced closer to 

ocation and 

e of building ea to be used adient of the d at different road)

future PC 

BPJ 4210 Octo

4.2 LThree Processanalysisconside

• • • •

After anthat thepackag

0 Final Projober 2012

Layout OpLayouts ws, an induss the thirderation:

Work flow Efficiency Flexibility Safety

n evaluationey prefer ding process

Layout 1

ject Docum

ptions were generastrial analysd layout c

n was maddue to the s.

ment

ated and osis techniqucame out

de by manareasin tha

one was sue (refer toas best o

agement theat will be e

Lay

Figure 3: Alter

selected uso appendixoption with

e second laexplained in

yout 3

rnative layouts

sing the Ax A) . Fromh the follo

ayout proven the comi

Layout 2

P

nalytical Hm the resultowing criter

ed to be theng section

Page | 5

ierarchy s of the rions in

e option on the

BPJ 4210 Octo

5 Lit

GenerCompaoperatioefficienccan be practicebest pra

When expendto pick with theshippingadvantathat the

Warehobetweeincreastimes a

Warehoprone toperatioadditionvoice re

In a picdisplay to pick.paperle

Voice pinstructsystem dealingpicking

Althoughere thareduce

WarehoBy Mart

0 Final Projober 2012

terature

ral nies are cons this is cy for minimadopted t

es vary fromactices that

consideringiture of effoorders neee most effig areas toage by conse items are s

ouse layoutn picking e in efficiennd storage

ouse operato human eons have an to hand-hecognition te

ck-to-light sylocated in By introdu

ess and elim

picking systions are seallows ope with paperto complem

gh many comat there arecost.

ouse Best Ptin Murray,

ject Docum

Review

constantly tan area w

mum cost. To improve

m industry t can be app

g the leveort is in the ds to be recient wareho minimizestantly reviestored close

t is also implocations c

ncy, companlocations.

tions that strrors. To co

adopted techeld RF reaechnology.

ystem, an ofront of thecing this sy

minates the

tems informent via RF ferators to per pick ticketsment the pic

mpanies wie a number

Practices About.com

ment

rying to finwhere supplTo get the mproductivity

to industry plied to mos

l of effort picking produced and houses hav picking tiewing their e to the ship

portant in acan greatlynies must d

till use hardombat this chnology thaders and p

operator wil pick bin w

ystem comperrors caus

m the operafrom the coerform picks. Many wock-to-light sy

ll not be abof best pra

Guide

nd ways toy chain ma

most out of y and overand by the st companie

involved iocess. To gthis can ac

ve the mosime. Thesematerial re

pping area

achieving gry improve develop pro

d copy pick and to max

hat is someprinters, com

l scan a baill inform th

panies can sed by pick

tor of pick ompany’s Ek operationsorld class wystems in p

le to afford ctices that c

o improve anagers cathe operatiorall customeproducts s

es.

in warehouain efficien

chieved in ast frequentlye companiequirement aare still the

reater efficiproductivitycesses to r

tickets find ximize effic

e of today’smpanies are

ar-coded labhe operator gain significtickets.

instructionsERP or ordes without loo

warehouse oplace for the

new technocan be ado

performancn focus onon, a number satisfact

shipped ther

use operatcies in pick

a number ofy picked itees achieveand producmost frequ

encies. Miny. Howeveregularly mo

that it is nociency, worls most adve introducin

bel attachedof the quancant efficien

s through aer managemoking at a coperations heir fast movi

ologies for ppted to imp

P

ce and wa to gain mer of best ption. Althoure are a nu

ions, the king the labof ways. Comems closese their comction data toently picked

nimizing traer, to achieonitor pickin

ot very efficd class wa

vanced systng pick-to-li

d to a box. Antity that thncies as it i

headset. Tment softwacomputer schave adopteing products

picking, we’prove efficie

Page | 6

rehouse maximum practices ugh best umber of

greatest our time mpanies st to the mpetitive o ensure d.

avel time eve this ng travel

ient and rehouse tems. In ight and

A digital ey need is totally

The pick are. The creen or ed voice s.

’ve seen ency and

BPJ 4210 Octo

EfficieIn ordewere idto be ta

1. Proensrequ

2. Anastag

3. Maxwaropti

4. Ensto umat

5. Cresho

6. Staopti

7. Conprodexte

8. Undefficprodass

MichaeKontanewww.ko

PickinThe moand insare faceservice need tobooken

Optimisare sucpicking use a cin the w

0 Final Projober 2012

ent operar to ensure

dentified by aken into co

ofile the maure that thuired. alyse the ging methodximise therehouse to mise these

sure propeunderstand terials and p

eate “wheeulder heighndardise lomise space

nsider autoducts arounensive travederstand tciency. Theduction. Thociated cos

l J. Stolarcze Logistics ontanelogist

ng best prodern warehstant gratificed with a mdelivery tha

o evaluate d it and try

sing pickingch a big pro

method. Toombination

warehouse w

ject Docum

ation the efficienstudying b

onsideration

aterial store storage c

picking mdology optim

e turnover identify thecrucial poin

er scheduliand monitopossible maelhouse” zoht racking) aoad sizes. e utilisation omation. Ond. Consideel time. Multhe techno

ese options e advantag

sts.

zyk

tics.com

ractices house and ication that much greatean ever befhow pickinto optimise

g will deliveroportion of to truly optim of picking mwere identif

ment

nt operationest-practice

n in the desi

ed in the wconfiguratio

methodologmises produ

of cruciale crucial ponts. ng. In a wa

or the requiraterial shortones. Plac

area of the wPack mateand ease m

Order pickeer and automti-level pick

ological opare design

ges of these

inventory bucharacteriser expectatfore. To delng integratee the overall

r big returnsthe total wamise most omethods. Tfied:

n of the wares and indugn and ope

warehouseon minimise

gy. It is imuctivity and l equipmenints in the

arehouse wrement schtages. ce fast movwarehouse erials in stanmaterial haners spend amated soluttowers also

ptions. Plenned to prove systems

usiness is mses the agetion of shoriver on theses into the process.

s to the opearehouse cooperations,

The following

rehouse a nustry bencheration if the

. Identify anes the dista

portant to meets the rnt. Undersprocess flo

with an 8 hoeduling to p

ving items ias far as pondardised undling. approximatetion, such ao save timenty of optiovide differenshould how

much affecte of the mort turnover rse expectat receiving

eration becosts.Some however, mg considera

number of imarks. The

e new wareh

nd monitor tance and n

ensure tharequirementand the p

ow then des

ur turnoverprevent the

in the “wheossible. unit loads as

ely 60% of as conveyane and are quons are avant levels ofwever be w

ted by the sodern consurates, cycleions, warehand shippi

ause pickinwarehouse

managemenations for im

P

mportant prese principlehouse.

the flow of Sumber mov

at the picknts of producrocess flowsign the pro

r rate it is imbuild-up of

eelhouse” (

s far as pos

f their time nce, to reduuite innovatailable to if increased

weighed aga

sense of immumer. Ware

e times andhouse manaing process

ng labour exes can use nt may well

mproving the

Page | 7

rinciples es need

SKUs to vements

king and ction.

w of the ocess to

mportant f excess

Knee to

ssible to

moving uce their ive. ncrease picking

ainst the

mediacy ehouses d prompt agement ses that

xpenses a single have to

e picking

BPJ 4210 Octo

1.

2.

3.

4.

5.

6.

7.

An effeunnecesystem possible

0 Final Projober 2012

The succewith efficieor in stacksUnderstanof the picki

a. Whab. Are c. Howd. Howe. How

Defining thin terms ofreducing piThree Primrule other requiremen

a. Piecb. Cas

opeSKU

c. Pallconuse

Select the basic pickinConsider include:

a. Autogenrequ

b. Autoof ro

c. Autoandope

d. Carang

e. Carf. Pick

pickqua

g. Statsuit

h. Voicrecehav

Ensure prodesign requselect and and ensure

ective pickessary move

and theree to the poi

ject Docum

ess of picknt putaways, sets up sund the pickng method at product othe items s

w many ordw many ordw often are he relevantf three keycking cycle

mary Pickithan pick

nts. ce Picking: se Picking: en box picksUs from whlet Picking: figurations

e to retrieve appropria

ng, batch pitechnolog

omatic picknerally restruirements.) omatic storaows of rackomated con

d sortation eration.) rton flow ragled downwarousels. (A sk-to-light. (Pk location, antity to picktic shelvinged for low-vce and speiving and h

ve a huge imoper plannuirements oimplement

e the continu

king systemement or adfore the want of deliver

ment

king strateg. The efficieuccessful ping requirein the ware

or types of pstored as piers are expers and howindividual St key pickiy objectivese time. ng System

k the syste

For low volCase pickins. A warehich it fills itsPallet pickand equipmpallet loadste picking cking, multies in Pic

king machinricted to ope

age and retking used innveyor andsystems a

ack. (Similaards, enablsystem of hPick-to light using softw

k) g. (Most comvolume smapeech recohas tremen

mpact on incning of the of the ware

the best pued feasibil

m must mdditional disare. The sry and rece

gies beginent positionicking.

ements. Thehouse: products/itecking piece

pected per dw many picSKUs includng objectivs; increasin

ms.In selectem (or hyb

umes of mang works foouse using

s orders as wking providement and ts. methods.i-order pick

cking Oper

nes. (The userations co

trieval syste both putaw

d sortation are genera

ar to staticing gravity f

hanging racksystems co

ware to lig

mmonly fouall parts opeognition. (Idous pickincreasing propicking syhouse and

picking systeity of the pi

inimise trastance traveimplest soliving point.

ns with Putning of inve

e following

ems are beines, cases orday? ks comprise

ded in an orves.In designg productiv

ting a pickinbrid system

any differenor operationg case pickiwell as highes a lot of the lift truck

There are fking, zone prations. Te

se of fully aombining hig

ems. (An exway and picsystems. (A

ally suitable

c shelving, feed to the ks that holdonsist of ligght the nex

und in pieceerations) ncreasingly

ng applicatiooductivity a

ystem. Undpicking sysems and mcking syste

avel time aelled reduceution is to

taway.Efficentory items

factors influ

ng shipped?r pallets?

e a typical order? gninga pickvity, increa

ng system m) which

nt inventory ns that arening usually her picks pealternativesks/towmoto

five commoicking and wechnologies

automated pgh volume

xpensive, hiking.) Automated e for large

except thapick face.)

d storage binhts and LEDxt pick tas

e pick oper

y popular on. Voice dnd accuracerstand thestem. Analy

methods. Prem.

and produces the effici

locate pro

P

cient pickings on shelve

uence the s

?

order?

king operatiosing accura

there is nomeets the

items. n't filling ord

has fewer er SKU. s as far as ors that pick

on picking mwave pickins for consi

picking macwith high a

igh retrieval

conveyor se-scale pie

at the shel

ns) D displays f

sk and disp

rations, this

for inventodirected pickcy.) e present anyse existingroject future

ct handlingency of the

oducts as c

Page | 8

g begins es, racks

selection

on, think acy and

o golden design

ders with product

storage kers will

methods: ng. deration

chines is accuracy

l system

systems ece pick

ves are

for each play the

s is best

ory and king can

nd future g data to e growth

g. Each e picking close as

BPJ 4210 Octo

Picking(figuraticritical–may incis the h

Best PrKevin CSmartT

5.1 M

5.1.1

Produc

1. Eng

In the drivers sitdownthe 392downtim

2. Flee

Other mtechnolallow wto reduc

Fleet mit. Onceto genecan idewhich hidentify shows more stranspo

0 Final Projober 2012

optimisatioively and li

–picking syscorporate muman capit

ractices for Colins Turn™

Material h

Material h

ctivity trend

gineering Pr

marketplacand increa

n counterba2 series Linme.

et Managem

manufacturogy into the

warehouse mce labour co

managemente logged in

erate reportsentify emplohelps increthe types

low lifting hsuitable for ortation.

ject Docum

on isn't a pterally) from

stems rangemultiple picktal.

Picking in W

andling e

 handling tr

ds:

roductivity

ce today, thasing produalanced forkde requires

ment Produ

rers, such eir lift trucksmanagers tosts.

t systems w, the systems on equipmoyees who ase warehof equipme

hours relativcertain ha

ment

point in timem everyonee from simpk methods, a

Warehouses

equipmen

rends in 2ThereHandldriver

The m

•••

here seemsuctivity. Liklift truck, ms no differen

ctivity

as Raymos with iWareo track usa

work by reqm tracks stament overallstart and souse produent neededve to travel andling task

e; it is a coe in the orgple racks anand multi-m

s and Distri

nt

012 e are some ling in 2012rs but also i

major trends

Labour coLowering Lowering

s to be incnde Forklif

model H25Tntial and th

ond and Crehouse andage of mate

uiring an opart time, endl usage. By

stop on timeuctivity. Byd for any gi

hours, a mks and red

onstant procganization.

nd shelving,million dollar

bution Cent

interesting2. Most ofnclude the e

s across ma

ost containmmaintenanenergy cos

creased intefts claim 22T 392. Witerefore has

rown, are ind InfoLink. Terials handli

perator to lod time, breay knowing se and worky knowing iven task. F

manager migduce capita

cess that reWhile the to very com

r investmen

ters

trends emf these themenvironmen

any large br

ment and prce costs

sts

erest in ma2% greaterh its hydross greater pr

ntegrating These fleet ing equipm

og into a liftaks, idle timstart and stok their equiplifting hoursFor examplght decide tal costs in

P

equires invtechnology

mplex systets in equipm

merging in Mmes focus nt.

rands includ

roductivity

anaging labr productivistatic transmroductivity w

fleet manamanagemeent (MHE)

t truck befoe, lifting ho

op times, mpment the s, supervisle, if a reacthat a pallehorizontal

Page | 9

vestment y part is ems that ment–so

Materials on cost

de:

bor cost ity for its mission, with less

agement ent tools in order

re using urs, etc, anagers hardest,

sors can ch truck

et jack is product

BPJ 4210 Octo

3. Auto

Other the Couroute inthe pallpicks thbutton. manufarackingand repsavings Lower

The memainten

Crown componmore efprocess

Yale anto the p

• • • •

RaymoreplaceRaymo

• • • • • • • •

Lower One of becomelift truck

0 Final Projober 2012

omated Lift

labour savurier Automn the warehet jack brie

he drop off p Using the

acturing to s. The advapetitive trips increases

maintenan

essage fromnance costs

Corp uses nent failuresfficient. Alsses, Crown

nd Hyster anpallet jack de

More rigiditAdded a foForks can sHigh Frequthe battery

nd Corp aneable wearand makes t

Heavy-dutyHeavy-dutyLonger comFaster acceLow step hPower steeUp to 6% mUp to 33%

energy cothe main c

e the themek manufactu

ject Docum

Truck Prod

ving innovmated Lift Thouse for prfly and pickpoint on anvision syste

storage or fantage to thps. And wi

exponentia

nce costs

m many ofs are contin

color-codes. Crown cso, due to thclaims thei

nnounced mesign, inclu

ty added to rk torsion bsustain a louency (HF) to prevent

nounced reable parts ihe following

y undercarriy bumper gumponent lifeeleration. eights to re

ering that remore produc

more energ

osts cost drivers e for warehourers.

ment

ductivity

ations inclruck (ALT).redetermineks up a palle on-screen em, the ALTfrom the dohis truck is th an oper

ally.

f the MHE uing to be r

d wiring anclaims this dheir vertical r componen

more durabdes:

the forks bybox to for monger life bycharger inc

overchargin

ecently a ren its underg claims abo

iage featureuard. e with seale

educe fatigueduces steective than thgy efficient t

in warehououse lighting

ude Raym This all-s

ed pick-up aet on the Amenu, and

T takes the ock to an aw

it now redurator sheph

OEMs (orreduced.

nd hundredsdrives down

integrationnt failures a

le pallet tru

y encasing ore stability the additiocrease battng and shor

vamped enrcarriage anout their ne

es ductile iro

d grab bar e

e. r effort by u

he competitthan the co

using operag manufact

mond Corpeeing automand drop-ofLT. He the

d tells the papallet to th

waiting Naruces the la

herding mu

riginal equip

s of fault cn repair cost

and close care more inf

ucks at ProM

the fork fray for the open with an etery life by rt life-in the

d-rider pallend self-lubrew model 84

on compone

electronic c

up to 90%.ion. mpetition.

ations, energturers, batte

’s recent mated palleff points. T

en turns the allet jack to

he drop off prrow Aisle trabour expenltiple ALTs

pment man

odes to het by makingcontrols in tfrequent.

Mat 2011.

me. erators. nclosed toesensing stabattery.

et truck buiricating bus410 end-ride

ents for lon

controls.

gy consumpery charger

P

announcemet truck is tThe operato

knob to auo “go” by prepoint, possiruck workinnse of long at a time

nufacturers)

lp quickly pg forklift techtheir manuf

The improv

e box. ate of disch

lt with hardshings. In aer pallet tru

ger wear.

ption reducmanufactur

age | 10

ment of taught a or drives utomatic, essing a bly from

ng in the tedious

, labour

) is that

pin-point hnicians facturing

vements

harge of

er steel, addition, ck:

ction has rers and

BPJ 4210 Octo

Did yougreater?efficienc

Many wlighting maintenenergy

And bereducedneeding

The Refficienclift equlowering

5.2 F

5.2.1 Informa

1. Lifelife

2. Seausetrucbattduriove

3. AbsAGMvibrcostthe wat

Warehowww.wa

 

 

0 Final Projober 2012

u know tha? This is cy.

warehousesare now

nance costsconsumptio

ecause LEd. This is bg to be repla

Raymond Ccy by 20%.ipment is g a load an

Forklift po

Electric foation on el

e expectanof 1500 cyc

aled lead-a in controll

cks (electrictery is madeing chargingr time.

sorbed GlaM batteriesration. Thist of floodedbatteries reer.

ouse IQ arehouseiq

ject Docum

at by 2014,part of the

are being favailable f

s. Just lookon and ener

ED lights hbecause anaced.

Corporation With their more energd plugging

ower sour

orklift consectric fork

cy for a lifcles or moreacid forklifted working

c pallet jacke into a geg. The loss

ass Mat Bas due to t technology

d lead-acid ecombine t

.com

ment

, you will ne drive to

fitted with hfor freezer k at US Coldrgy costs fro

have a lonn LED light

n has intrregenerativ

gy efficientto a stop.

rces

siderationlifts

ft truck’s be. t battery: M

g environmeks) as theyl and seales of moistu

atteries (AGtheir duraby is sealed abatteries.

the oxygen

ot be able reduce ene

high efficienwarehous

d Storage wom 46 cents

nger life sfixture can

roduced ecove loweringt and retur

ns 

attery: For

Maintenancents such ay can operaed inside the

re shortens

GM) for forbility and aand mainteBy using aand hydro

to buy a ergy consu

cy lighting. ses to reduwho installeds/sq. ft. to 3

span, mainexpect up

o-performang and ACR srns energy

rklift lead ac

ce-free batteas pharmacate in any e cell. Valvs the life of

klifts: Germability to enance free,

absorbed glogen inside

light bulb tumption an

And LED luce energyd LED lights3.5 cents /sq

ntenance cto a 20 ye

nce touting system, Ra

back into

cid batteries

eries are aceutical maposition. Tved cell capf the mainte

man high peendure exte, however aass mats bthe cells a

P

that is 40 wd increase

lights and iny use and s and reducq. ft.

costs will aear life span

increasedaymond clai

the batter

s usually ha

popular opanufacturingThe acid insps allow forenance-free

erformanceensive sho

are almost twbetween theand lose alm

age | 11

watts or energy

nduction reduce

ced their

also be n before

d energy ms their ry when

ave work

ption for g. pallet side the r venting e battery

cars us ock and wice the e plates, most no

BPJ 4210 Octo

5.2.2 Gas Fo

Gas-powithstanand nee

1. GasR124 00

2. Gas•

3. Gas•

Electric

ElectricElectricindustri

1. ElecR24R40

2. Elec•

• 3. Elec

0 Final Projober 2012

Gas versuorklifts

owered forknd uneven ted to be ser

s Forklift P20,000 to 00kg capacs Forklift PPrice - Gascosts slightVersatility -wider varielandscaping

s Forklift CCost to opea more regfor one, whNoisy - Thequiet areasProduce eemissions t

c Forklifts

c forklifts ac forklifts aral facilities.

ctric Forkl40,000, dep0,000 extra ctric ForkliCheaper tobatteries arLonger lifesto fail. In soEco-friendlyctric ForkliPrice - Deshave to sheNot suitablthe elemenRequire chbe operatioavailable w

ject Docum

s Electric F

klifts are deterrain and rviced regu

Prices: A sR240,000. city forkliftsros: s forklifts atly less than- Because gety of jobsg and farmi

Cons: erate –Gas gular basis hich is not ine engines as. emissions - that are har

are battery-re designed

ift Prices: pending on for a batterift Pros:

o operate - Ere rechargespan - Elecome cases, y - Electric ift Cons: spite the moell out moree for outdo

nts. arging - Moonal for a

when you ne

ment

 Folklifts 

esigned for harsh weatlarly to rem

standard 2The price

s can cost u

are less expn an electricgas forkliftss, tasks anng, to name

forklifts havthan their e

nsignificant.are noisy, s

As with rmful to the

-powered ad primarily f

A standardbrand and

ry and charg

Electric forkeable and rectric forklifts

the lifespanforklifts do

oney you’ll se cash upfrooor use - El

ost batteriesfull day. U

eed them.

outdoor usther. Much ain in good

000kg cape varies baup to R360,

pensive upfc model with are design

nd industriee just a few

ve more onelectric cou so gas-pow

any gas-penvironme

and requirefor indoor u

d 2 000kg cquality. In sger.

klifts requireeplaceable.s typically lan of an elecnot produce

save on fueont to purchectric forklif

s need abouUnlike gas

se. They arlike your ca working co

pacity gas ased on th,000.

front than eh the same ned for outdes. They c

w.

-going expenterparts.F

wered forklif

powered vent.

e regular reuse, particu

apacity elesome cases

e no fuel an

ast longer bctric forklift ie harmful em

l and maintase an elecfts can be

ut eight houforklifts, ele

re sturdy aar, gas forklondition.

forklift cose brand a

electric mosize and sp

door use, thcan be use

enses and rurther there

fts can crea

ehicle, gas

echarging, ularly in wa

ctric forklift s, you migh

nd very little

before majos nearly domissions.

tenance in tctric forklift. easily dam

urs of chargectric forklif

P

nd rugged,ifts run on g

sts anywhend quality.

dels. A gaspecificationshey’re suitabed in cons

required see’s the cost

ate a distra

s forklifts

usually ovarehouse an

costs R160t have to pa

e maintenan

or componeouble.

the long term

aged if exp

ing for the ffts are not

age | 12

built to gasoline

ere from Larger

s model s. ble for a truction,

ervice on t of fuel,

action in

produce

vernight. nd other

0,000 to ay up to

nce. The

nts start

m, you’ll

posed to

forklift to t always

BPJ 4210 Octo

Kompa

5.2.3 Fuel ceinvestedreducinputting building

1. Ememiair souprodsteagas

2. Fuemigequinto

3. Equforkinvealsoopewherefu$2,0hyd

5.3 FAn inveresults merely

5.3.1 Hand p

1. ST3• F

pav

0 Final Projober 2012

reit.com

Hydrogenells have bd into reseag emissionthe techno

g fuel cell fo

issions assions. In fand or storcing of hyduced fromam. This p would. So

el Costs: Hht think the

uivalent wor a battery.

uipment Coklifts. Batteestment for o. They areerational lifeereas a Feruel a fuel c000 per forrogen refue

Forklift typestigation oin terms ofan indicatio

Hand operpallet truck

3000 Full-functionproven reliaarticulating value. (By C

ject Docum

n forklifts een heraldarch and des and makilogy into th

or forklifts. S

nd Air Qfact, they p

ored in a rydrogen for

m reforming rocess prodthe environ

Hydrogen ise fuel is cork, the fuel

osts: Anotheries contin

the fuellinge roughly th of 10 yearsrro-resonancell is anywrklift chargeelling infrast

pes of the specf forklift typ

on of the alt

rated forks:

n control ability, strowheels, ea

Crown forklif

ment

 ded as the evelopmentng the air w

he car markSome proble

Quality: Fuproduce onlyreservoir th

the fuel cenatural gasduces morenmental clais not cheapmpetitive wcell will cos

her problemnue to riseg of forklift he price of 3s – longer t

nt battery chwhere from er, there wtructure cos

cific forklifts pes and maternatives o

klifts 

handle witong fork desy pallet enfts)

green solt for makingwe breathe ket, new coem howeve

uel cells, y water vapat gets remell is less ss, a processe CO2 into ms for fuel p. When y

with the cosst you twice

m that fuel cee in costs trucks. The3 batteries han theestiharger costR2,400,00

would need sts.

available akes. This n offer.

th neutral, esign, durantry and ex

ution to cag the techncleaner. Wmpanies har remains w

like battepour which imoved durstraight forws that sepathe atmospcells are no

you think abst of propane for fuel o

ells might sand repre

e problem iseach, but amated usefts roughly R

00 to R8,00to be 75

for the waris not the

hydraulic able framexit and long

ars. Much nology workWhile scientave also emwith this tech

ries, contris absorbeding a fuelli

ward. Hydrarates the hphere than o completelybout hydrogne or electrover the pric

olve is the csent, with s that fuel care estimateful life of a foR16 000, th00,000. Asforklifts to

rehouse yiefinal list for

unit and -term

P

money hak in the car ists are wo

merged lookhnology:

ribute no d by the waing event. rogen must hydrogen ga

simply burny straight fogen fuel cericity. Howece of electr

cost of battchargers,

cells are exed to have orklift battehe infrastru

ssuming 3 sequal the

elded the fr considera

age | 13

as been market, rking on king into

harmful rehouse But the first be

as using ning the orward. ells, you ever, for ric going

eries for a large

xpensive a useful ry. Also,

ucture to shifts at cost of

following ation but

BPJ 4210 Octo

Power

2. WT •

Stacke

3. ST •

5.3.2 Reach

5.3.3 Electric

1. Doo•

5.3.4 Turret t

1. TSP•

0 Final Projober 2012

pallet truc

3000 The WT 3including fo3 tons anoperator s123® contrside restrai

rs:

3000 The ST 30same levellargest heachassis waoutriggers and productraction sys

High­leveltrucks:RR

The Crownreach truckComprehentechnology most compforklifts)

Heavy dutc counter b

osan Counter badriven hard(Hyd., Drivfaster trave

Narrow istrucks:

P 6000 The TSP 6range of wapicking to tslightly widlift to 11.7 m

ject Docum

ks:

000 offers our platformd electron

suspension,rol system, nts.(By Cro

000 Stackerl of durabilavy-duty starranty. Adprovide thect changesstem deliver

l forklifts 5200

n RR 5200k industry fonsive Syst provides t

prehensive

ty forkliftsbalance tru

alanced trucd every dayve), optimisel and lift sp

sle trucks 

6000 Seriesarehousingtransporting

der than them with a ma

ment

the widestm configuranic steerin e-GEN™ Entry Bar S

own forklifts

r Series waity, reliabili

tackers anddjustable foe flexibility ts. The uniqr precision c

 

0 delivers tor travel andtem Contrthe operatodiagnostics

s ucks:

cks are they. Includes:sed operat

peeds. (By D

 

s offers the challenges

g and stagine truck itselfaximum cap

t model vaations, capng. Include

braking sSafety Switc)

as engineerty and eas

d is backedorged forksto keep paue X10® hcontrol. (By

he best ped lift/lower frol with Aor and servs in the ind

e workhorse full AC cotor comfortDoosan fork

e versatilitys from full png. Operatif, the TSP

pacity of 125

ariation avaacities of ues: FlexRsystem, Acch and quic

red to delivse of use ad with a lif

s and adjuce with bushandle andy Crown fork

erformance functions. CAccess 1 ice team w

dustry. (By

es of the inntrol, Gecht and safeklifts)

y to handle pallet put-awng in aisles6000 Serie50 kg.

ilable up to ide™ ccess k-exit

er the as the fetime stable siness SEM klifts)

in the Crown's

2 3® with the

Crown

ndustry, hnology ty and

a wide way and s only

es can

P

age | 14

BPJ 4210 Octo

Articula

1. B 3•

Source

5.3.5 Counte

Standatruck isforklift aover loincreas

Turret t

Turrets and conlevel offorklift isand ma

Reach

Reach smaller levels udamagewell as

Articula

Articulaof the aand incThe art

5.4 AAdvant

• • • • • •

0 Final Projober 2012

ated trucks

15 AC Designed storage de

: Goscor lift

Forklift tyerweight tru

rd forklifts s the workhare its ruggng distanceed aisle wid

trucks:

trucks lift thntrol. The fof productivis that it isn’

aintain and i

trucks:

trucks are r width thanusing narrowe and decrebeing more

ated trucks

ated trucks aarticulated trease functiculated truc

Automatetages:

Fully automIncreased hImproved sPayload caSingle, douLatest cont

ject Docum

s:

to give optensity excee

t truck comp

ype compaucks:

mainly usehorse of theged design,es. Its disadth requirem

he forklift oporklift is alsoity than mot suited for t can only o

forklifts spen conventiow aisles. Hoease produce expensive

s:

are designetrucks are ittionality in tecks are how

d storage

matic storagheight limit,storage capaapacities upuble, and satrol technolo

ment

imum aisle eding very n

pany.

arison 

d in warehe warehous its low maadvantagesments and it

perator up wo able to opost forklifts unloading o

operate on p

ecifically denal forkliftsowever reactivity by st

e than conve

ed as a repts increasederms of capwever expen

e

e. up to 41m.acity in a re to 1,500 kg

atellite storaogies.

performannarrow aisle

ousing andsing industraintenance include itsts lack of fle

with the levperate in ve

(32+ palleor transportperfectly fla

esigned to . Reach truch trucks tetoring goodsentional fork

placement tod productivpability to pensive to pro

. educed footg. age configur

ce. Can stoe (VNA) inst

d material mry. The macost and itss limited caexibility.

el of pickingry narrow a

ets per houtation on goat surfaces.

store at greucks provideend to causs out of theklifts.

o the reachity, decreaserform otheocure and m

print.

rations.

ore in 1.5mtallation. (B

movement. ain advantags ability to apability of

g enabling iaisles and our).The disaoods, it is ex

eater heighe the abilityse increasede clear view

trucks. Thesed materiaer functions maintain.

P

m aisles andy Bendi for

The counteges of this transport m

f 6m high

increased aoperates at aadvantagesxpensive to

ht and in aiy to store ad material h

w of the ope

e main adval handling such as un

age | 15

d enable klifts)

erweight type of

materials storage,

accuracy a higher

s of this procure

isle of a at higher handling erator as

vantages damage

nloading.

BPJ 4210 Octo

Disadv

• • • •

5.5 S

5.5.1 Universtypes o

1. Uni•

2. Uni•

3. Uni•

4. Uni

Other ra

5. Glid•

5.6 CAfter cconside

0 Final Projober 2012

vantages:

Expensive.Complex. Difficult to iError-prone

Storage eq

Racking osal storage f racking to

-Rack: AdjAmbient anpaper; timbmany other-drive: HigDrive-In Systems, O-PushbackInterlinked track. -Shuttle: M

A shuttle sand a shutpropelled bthat can lift

acking optio

deRack; MoGlideRack designed tslower movstorage. Prior to Glirows. Now 4-20 rows o

Conclusioconsideratioerations wer

ject Docum

mplement. e.

quipment

options systems pro be conside

justable pand coldroomber; chemicr uses.

gh Density Racking

Open-Facedk – Pushba

trolleys th

Motorised P

system conttle cart. Thby an electr up and dow

ons include

obile Rackis Mobile

to move.Thving items

deRack anwith GlideR

of single se

on on Liteon of the re identified

ment

t

ovides the fered:

allet rackingm pallet raals; heavy

Pallet RackSystems,

d Racking Sck Pallet Rat run on

Pallet Rack

nsists of sue shuttle caric motor. Itwn.

:

ing for incre Rackinghis system the opportu

aisle was Rack 1 aislelective rack

erature Reinformation

d.

following pa

g: acking – cocomponent

king: Drive-Thro

Systems. Racking:

an inclined

king:

pporting raart runs on t has a plat

reased sele. Mobile

is designunity for hig

required foe is requireking.

eview n indicated

allet racking

onsumer gots and parts

ough Rac

d track with

ack, shuttle the rails a

tform on the

ectivity: racking ised to givegh capacity

or every twod per every

d in this d

g options as

oods; s and

cking

hin a

rails nd in e top

s e y

o y

document a

P

s an examp

a number

age | 16

le of the

of key

BPJ 4210 Octo

5.7 KWarehoefficiencgoods sparticul

A criticathe arrivto buildwareho

The proimportareap the

The prdevelopimplicat

In termsthe speavailab

1.

2.

Other rinexpen

Automaoperate

It is alsoand lay

5.8 KSince ttranspo

0 Final Projober 2012

Key inbouousing bescy and accstored in thar warehou

al success val of goodd-up of ex

ouse.

oper layout ant factor. Te maximum

rocurement pment of antion are som

s of types oecific requirle for consid

The use of store and re

• Sma• Hig• Mor

Only using • Wid• Les

racking optnsive effecti

ation is deee. It is theref

o importantout of the w

Key outbothe outbounortation the

ject Docum

und consist-practice curacy. Howhe warehouuse and the

factor of ths according

xcess good

design of thhe layout d

m benefit fro

of the ren efficient wme of the im

of forklifts, grements of deration.

f conventionetrieve gooaller aisles.her stackingre expensivconvention

der aisles ress expensive

tions shoulive racking

emed too efore exclude

t to take thewarehouse.

ound connd warehourecommend

ment

iderationsregularly pwever dueuse these tcost assoc

he warehoug to the prods, directly

he warehouesign also m layout de

equired forkwarehouse. mportant con

gas forkliftsf this wareh

nal forklifts tds. g ability.

ve. nal forklifts tequired. e.

d be conssolution.

expensive aed and a fe

e environme

sideratiouse mainlydation is to

s point to m

to the fastechnologic

ciated theref

se would boduction sch

impacting

use to minimneeds to beesign advan

klifts for thThe cost, rnsideration

s seem to ohouse. Two

to load and

to unload an

idered, alth

and requiredeasible optio

ental impact

ns y acts as akeep the pr

modern techt turnover al advancefore remain

be the propehedule. Inac

the produ

mise the trae effectivelyntages.

he warehoureliability, mto take into

utperform eo material

unload tru

nd store pal

hough palle

d extensiveon.

t into accou

an accumulrocess as b

hnology toand low m

es promise s unwarran

er planningccurate schuctivity and

avel distancey implement

use is a cmaintenanceo account.

electric forkhandling p

cks and spe

llets.

et racking

e implemen

unt when de

lation area asic as pos

P

o increase material vari

little benefnted.

g and schedheduling wod utilisation

e of materiated and enf

crucial parte costs and

lifts with regprocesses a

ecialised fo

should pro

tation and

esigning the

in preparassible.

age | 17

picking iation of fit to the

duling of ould lead n in the

als is an forced to

t of the storage

gards to are also

orklifts to

ovide an

skills to

e lighting

ation for

BPJ 4210 Octo

6 De

The proengineethen fustrategylean stoof the pare wei

After thdepartmallocatethe lean

This prothree seThe inbmateriawas dethe proddesign controll(third pa

To faciover theach de

Table 1: S

 

0 Final Projober 2012

esign Ap

oject was doering technurther undey that was orage for eqproject, whighed and th

he global dments are ae the differen storage de

oject will foeparate desbound was al handling veloped to ducts in theof the outbed by a tharty).

litate the de systems esign stage

Systems Engine

ject Docum

pproach

one using aiques to firs

erstanding tused in the

quipment. Tch is whenhe most sui

design folloallocated toent departmesign were

cus on the sign section

analysed equipment.mark the lo

e factory is ibound warehird party m

esign improlife cycle m during the

ering Method o

ment

a top down ast understathe functione project is

The lean sto the plot seitable layou

ws the Suo different aents and thcovered in

macro desns starting w

by tracing . The proceocation of thillustrated uehouse will meaning the

ovement prmodel. Theimplementa

over life cycle m

approach wand the neenal require

s a top-doworage methoelection critt is selected

pra-level oareas in thehe optimal la

the first pha

ign where twith the inbo

all the inbess was firhe machineusing a flow

not be deae layouts a

rocess the e table beloation of the

model 

while implemeds or expements of t

wn approachod first analterions are d.

f the desige plot. A reayout was case of the p

the factory ound, procebound procrst describeery on the p

chart for thalt with in dnd configur

systems eow summarimproveme

menting induected outcothe facility. h which is yses the glostated and

gn, this is elationship chosen. Theproject.

design will ess and outbcess, functioed then a cackaging a

he making odepth in therations are

engineering rises the acent method.

P

ustrial and somes of the

The mainused for deobal view othe availab

when the chart was

e first two s

be broken bound responality, spaco-ordinate rea. The m

of Handy Ane project si

designed

method wactivities invo

age | 18

systems e project n design esigning r design ble plots

different used to tages of

down to ectively. ace and method aking of

ndy. The nce it is by DHL

as used olved in

BPJ 4210 Octo

7 InbTo facidiagramfor the i

Material in

Inbo

und Folklift

Truck

Stores

Prod

uctio

n Planners

Productio

n Folklift

Security

Truck driver

Material 

requirem

ent 

planne

rs

Prod

uctio

n line 

operator

Figure: In

0 Final Projober 2012

bound Militate comm

ms that showinbound raw

flow

truck arrival

Plan Prod

Establish productitarget 

bound flow pro

ject Docum

Material Fmunication w the matew and packa

Inbound Truck inspection

Drive to the truck

duction Check shrequi

ion Plan

requ

ocess  

ment

Flow within the

erial and infoaging mate

Did Truck painspection

Lift th

R

yes

ift material rement

n material irement for period

Ches

design teormation florial has bee

ass n

he mast

equest material from stores

Checavail

request

Check m

Truck parkunloading d

Order required material

Security p

eck material in staging area

eam it is aows. The firen captured

Trucu

Get off the truck

k material ability of ted material 

location of aterial

outboundinspect

ks to dock

protocol

Is there enougmaterial in the sta

area?

Pick‐up pallet

always recorst version od and docum

ck parks to unload

Produce paperw

Drive to dedicastorage

Pick‐up materfrom rack

d Truck tion

Is material available ?

Dii

yes

gh aging  Yes

P

ommended of the flow

mented belo

work

ated  Place Mathe 

Approve material request

rial  

Drive to exit gate

d truck pass inspection

App

Put materiacorrect plac

Delive

age | 19

to use diagram

ow.

Phase

aterial on rack

Exit

prove material request

al in the ce of use 

er to the place of use

BPJ 4210 Octo

7.1.1.1 After th

Produc

Materiaof matethen the

Produc

Stores:materia

The sum

When aweighindock wfolk lift t

The folkwarehodeliverereleasethe mat

0 Final Projober 2012

Flow diage team revi

ction plann

al plannerserials on thee rest of the

ction Opera

:Receive pual > stage m

mmary for t

a truck drivng and secuhere the truto come un

k lift comesouse where ed to rack te their produterial in the

ject Docum

gram correcewed the w

ners: all they

s: After proe system, ese flows we h

ator: Gener

ull list > chematerials

he flow of m

ver arrives urity checkiuck driver iload materi

s to the unlothey are sthey are firsuction plan warehouse

ment

ction anddework flow a f

y would do

oduction plastablish if mhave under

rate pull list

eck availab

material to t

to deliver ng. If the tis required al,

oading doctored in racst staged cl

to the mate and compa

escription few change

is plan prod

anner plansmaterial on h

material pla

– this woul

bility of mat

the packagi

material, ruck passeto provide

ks to take tcks that areose to the terial planerare it to the

es had to be

duction.

s material plhand is withanner will fo

d be the firs

erial reques

ng area is a

it passes ts the test ithe require

the deliveree three leveunloading ars and they required in

e done as fo

lanner woulhin targeted/ollow.

st step -

sted > loca

as follows:

through thet then drive

ed paperwo

ed material els high. Bearea. The py then checnventory.

P

ollows:

ld check av/required le

ate material

e security ges to the unork and wait

to it locatiofore the ma

production pck the availa

age | 20

vailability evel, and

s > pick

gate for nloading t for the

on in the aterial is planners ability of

BPJ 4210 Octo

Material infInbo

und Folklift

Truck

Stores

Prod

uctio

n Planne

rsProd

uctio

n Folklift

Security

Truck driver

Material 

requ

irement 

planners

Productio

n line 

operator

Material Plann

ers

figure:Rev

After thmateria

0 Final Projober 2012

flow

truck arrival

Plan Produ

Establish productiotarget 

Ge

vised flow proc

he flow diagal flow was c

ject Docum

Inbound Truck inspection

Drive to the truck

uction

Checre

n  Plreq

enerate pull list

Yes

Rec

cess chart 1 

gram was cconstructed

ment

Did Truck pass inspection

Lift the m

yes

ck shift material equirement

lan material quirement for period

O

Check mstagi

ceive pull list

compiled a d and will be

mast

Check maavailabilit

requested m

Check locamater

Truck parks to unloading dock

rder required material

Security proto

material in ing area

Pick

Is available material enough for production

more detaie shown as

Truck parunload

Get off the truck

Request mafrom sto

aterial ty of material 

ation of ial

outbound Trucinspection

Isav

ocol

Is there enough material in the staging 

area?

k‐up pallet

no

led step byfollows:

ks to d

Produce paperwork

Drive to dedicated storage

aterial ores

Pick‐up material  from rack

ck 

s material vailable  ?

Did truckinspect

Yes

y step analy

P

Place Material othe rack

Approve requ

Drive to exit gate

k pass tion

Start pro

yes

Put material in thecorrect place of use

Deliver to thof use

ysis of the

age | 21

Phase

on 

material uest

Exit

oduction

e e 

e place e

inbound

BPJ 4210 Octo

Loaded Truck

Offloaded p

2) Of

After the trulift tomatertaken pallet of ava

4) Placin

The key material idedicated material accumulatitaken to tstored undelivered to

0 Final Projober 2012

1) Vks

allets

ff loading

the driver hasuck in a positioo effectively rial from the

off from the at a time dep

ailable forklifts

ng in Stora

action in this to place or random rahas been

ion area they the area whetil the time o the place of

ject Docum

Vehicle mano

Turning CircleQueuing

Plant layout

Space availableRoad infrastructu

3) Accu

Volumes –Arriv

Loc

Sp

s managed to on that allows

reach and truck, the maside of the trending on the

s.

ge

he delivering material in

ack and after kept in

are ready toere they will when they use.

ment

oeuvring

ere

umulation

– peak trafficval ratecation

pace

Accum

position s the fork

collect aterial is ruck one e number

of n a

the the

o be be

are

Parked trucks for unloading

Loaded Trucks

P

ulated pallets

2)

T

Pallets ready for storage

4) Placin

VolumeA

ER

Tructo dthat arrivmandriveoptimmate

) Offloading

Truck arrival patternTruck type

Offloading baysInterface

EquipmentResources

Time

ng in storage

es – peak trafficAllocation

quipmentResources

Time

1) Vehiclecks arrive fromdeliver materia

can be idenves for delivnoeuvring actier tries to posmal position erial from the

3) Accumu

The third noperformed dstaging of thdesignated aspace to accpallets. Threquirement was not posprocess

P

e Al

e manoeuvm the main wal and the fintified when vering materiaion which is sition the vehfor the off-lo

trailer.

ulation

otable action tduring and afthe pallets in tarea. This arcumulate a speis action iwhich could

ssible to avoi

age | 22

Empty truckPallets

llocated pallets

vring warehouse irst action a vehicle al is the when the icle in the oading of

that needs tofter off-loadingthe accumularea will serveecified numbeis an optio

be avoided id in the mak

o be g is

ation e as er of onal but

king

BPJ 4210 Octo

Allocated pa

Required palle

f

6) P

A thewh

8) Fe

This the laof raw

0 Final Projober 2012

llets

ets

igure: Inbou

Picking

folk-lift wille pallets froen it is requ

ed Product

step can bast stem in w and packa

ject Docum

5) Stora

Volumes – per fVolumes – per p

Stacking polStorage type/m

Layout

Storage equipmSpace

7) Staging

ScheduleUnit loads

Kit compositionLocation

EquipmentResources

TimeSpace

und flow an

come andom the storauired.

ion Line

be recognistracing the aging mater

ment

age

formatproducticyethod

ment

g

alysis

Unit lo

d collect age area

sed as inflow

rial.

Stored pal

Stored pallets

Unit loadsPartial pallets

Returnable packagi

oads

llets

ng

8) Feed p

Delivery-Delivery –Formats/

SiVolu

EquipReso

Tim

5)

Thefromreqpickfor tworacktimeoptiattr

7) Stag

Stagingtemporthey anormalpallets with thpallets

6) Picking

Schedule

EquipmentResources

Time

prod. line

distance– location/Productsze

umes

pmentourcesme

Storage

e material is thm the racksuirements for ked and delivethe staging w

o 8 hour shiftsking system es to show imal with speibute

ging

g in this rary locationre put to ully holds ap

of inventohe extreme

which requ

P

Delive

hen stored ans dependingthe shift the

ered. The storwarehouse wos. The design

based on which optio

eed as the m

context refn of the mause. The spproximatelyory for moexclusion o

uire more in

age | 23

Required pallets

ered unit loads

d retrieved g on the material is rage policy ould be for will use a simulated

on will be ain design

fers to theterial before

staging areay one to twoost materiaof the bottleventories.

e e a o al e

BPJ 4210 Octo

InbouThe fowareho

Figure:

The folarea an

1) Truc

Table 2: T

CC's BottlesCaps DividerPoucheOther Raw mats 

0 Final Projober 2012

nd procellowing is

ouse.

Actions for

lowing assnd activity in

ck parking • Parking• Trucks

of 2.975• The tru

the max• The tru

Truck Arrival Ra

Total pallets/

rs es 

  

  

ject Docum

ess flow an illustrat

r inbound flo

umptions wn the proces

g/unloading arrive at th5 trucks/houck arrival raximum mateck arrival ra

ate 

/12hours 

1354324

12

ment

tion of the

ow

where madess:

bays for 4 te inbound wur with peakate is calcuerial flow. ate is calcul

Total pallets/d

3 4 8 2 0 1 

  

expected

e in determ

trucks are awarehouse k times betwulated base

ated as foll

day  Pa

2551043

734377

232

173

To

process fl

mining the d

available forover a 23 h

ween 10:00d on the es

ows:

allets/truck

482626262626

26

otal 

ow for the

design requ

r simultaneohour period 0 and 12:00stimated ma

Trucks 

5.3 40.1 2.8 1.7 3.0 8.9 

6.7 

68.4 

P

e inbound

uirements f

ous unloadat an avera

. aterial flow

Trucks/hou

0.231.7440.120.070.120.38

0.28

2.97

age | 24

material

for each

ing. age rate

and not

ur 

1 4 2 2 9 8 

BPJ 4210 Octo

2) Acc

3) Stor

4) Stag

a) Offl

b) Plac

c) Pick

d) Fee

e) Ret

0 Final Projober 2012

cumulation • Pallets • Space

trucks arage • The siz• Initial st

i. ii. iii. iv.

• The folli. ii.

• An addcompen

• Other p15% of

ging • No add• Staging

and cap• All othe• Product

packingoading • Trucks • A forklifcing in stora• Pallets

materia• Materia• The trav

i. ii. iii.

king • All palle• The trav

i. ii. iii.

eding produ• Materiaurn packag

ject Docum

in accumulis allowed fand one 48

ze of pallets tacking regu2 for finishe2 for empty2 for return2 for Caps lowing mateCC’s 3 highRaw mater

ditional safensate for aspackaging mthe total pa

itional stagig space shops stacked er materials ts are all deg lines by au

will be offloft takes on aage will be tra

al. als will be plvel time for 7 minutes fXs for mateetc.

ets will be trvel time for 7 minutes fXs for mateetc. ction

als will be feing and par

ment

ation are stfor 100 pallpallet truck

is assumedulations is ded goods. y bottles. nable packa

erials are toh. rials 3 high.ety margin ssumptions materials suackaging ma

ing equipmeould equal t1 level highwill be stoc

elivered by utomatically

oaded by foraverage 3 m

ansported to

laced in stoforklifts to s

for Bottle paerial Y to lin

ransported tforklifts to p

for Bottle paerial Y to lin

ed into the prtial pallets

tacked up tolets in the a

k.

d to be 1.0mdefined as:

ging.

o be placed

of 40% ismade durin

uch as labeaterial requ

ent is requirthe space reh. cked outsideforklifts to ty or by hand

rklifts. minutes to u

o allocated

rage by forkstore materallets to hanne Z

to the stagipick materiaallets to hanne Z

production li

o 1 level higaccumulatio

m by 1.2m;

in racks:

s added to ng flow calcls and shrinirements.

red. equired to p

e of the mahe staging d.

unload a pa

marked s

klifts. rials is assund Andy Pa

ng area by als is assumnd Andy Pa

ines from th

gh. on area, tot

packagingulations. nk-wrapping

place 1 hou

in storage aarea and th

llet from a t

lots accord

umed to be: ckaging sta

forklifts. med to be: ckaging sta

he staging a

P

talling two 2

g material s

g is accepte

urs’ worth o

area. hen delivere

truck.

ding to the

aging

aging

area by han

age | 25

26 pallet

stock to

ed to be

f bottles

ed to the

type of

nd.

BPJ 4210 Octo

f) Loa

0 Final Projober 2012

• Partial p• 1002 em

and storequirem

• 38 traysby stac

• 544 carstored b

• Cartons• Space i• Space i• Space i

ading return• Returna

deliver • 100 pa• 1002 re• 1 pallet• 11 palle

ject Docum

pallets are rmpty pallets

ored by stacments. s are to be king bundlertons are toby stacking s and lids ais provided is provided is provided able packagable packagmaterials.

allets (10% oeturnable pat of trays reqets of carton

ment

returned to s are to be cking bundl

returned pees to 1 levelo be returnebundles to

re assumedfor 8 hoursfor 8 hoursfor 8 hoursging and exging and ex

of the estimallets requirquire loadinns require lo

storage. returned pes to 2 leve

er shift and l. ed per shift1 level.

d as one un’ worth of re of trays. of cartons.

xcess materxcess good

mate) of excre loading png per shift.oading per

er shift andels high ba

are handled

t and are h

nit and retureturnable pa

rials ds are load

ess goods aer shift.

shift.

d are handlesed on the

d in bundles

andled in b

ned togetheallets.

ed onto the

are loaded

P

ed in bundleestimated

s of 100 an

bundles of 1

er.

e same tru

for return p

age | 26

es of 10 material

d stored

100 and

cks that

per shift.

BPJ 4210 Octo

7.1.1.2

EquipmentTime

ResourcesSpace

RoadInfrastructure -

spaceInterface

OffloadingBays

RoadInfrastructure –

traffic

Figure 4: C

The diaouputs requirem

0 Final Projober 2012

Overview

8) Feeding production

Combined inbo

agrm=am sof the step

ments for e

ject Docum

w of the inbo

)g

7) Staging

Partial palletsReturnables

ound flow analy

summarisesps in the inach of the s

ment

ound flow 

5) Storage

6) Picking

ysis 

s the maternbound. Thsteps.

4) Placing in storage

Delivery -distance

Delivery -location

Formats/products -

sizes

Formats/products -volumes

rial the stehe diagram

3) Accumulation

Unit loadKit composition

Location

ps involvedalso show

2) Offloading

Volumes –product/format

Stacking policyLayout

Storage type/methodSchedule

d it shows ws the phys

P

1) Vehicle manoeuvring

all the inpsical and fu

age | 27

Turning CircleQueuing

Plant LayoutTruck arrival pattern

Truck TypesVolumes –peak traffic

Arrival rateLocation

Allocation

puts and unctional

BPJ 4210 Octo

8 SyIn ordeissues ssystemsuse on willattem

The modevelop

Figure 5: S

The momain goprocessthe decdevelop

0 Final Projober 2012

ystems Dr to responsuroundings dynamicsany of the

mpt and inc

odel below iped. It is a

Systems Engine

odel will havoal of the ms when addcisions madping softwar

ject Docum

Dynamicsd to the pro the expect

s model wilir factories.

clude everyt

is a rough smodel that

eering Model 

ve some simmodel is toressing thede in a simre intense s

ment

s Factoryoblem of thted levels ol be develo The modething that is

sample of aillustrates t

mple characo address ae productionmpler mansimulation m

y modele unstable

of inventory oped. This mel will be bas neccesary

a model simhe causal re

cteristics ofany issues n and storagner to avo

models.

demand ofthat should

model will based on they for produc

milar to the oelationships

f the similarthat are ne

ge design coid the elon

f the marked be kept inbe customi

e Waterfall ction.

one that thes that are fo

r to the preceeded in thonstraints. ngated wai

P

t and the un the warehzed for Unproject. The

e model thaound in a fa

ceding modhe decision It will help siting period

age | 28

ncertain house, a ilever to e model

at will be ctory.

del. The making

simulate ds when

BPJ 4210 Octo

8.1 MThe flosuccessparamewhich isdata thfunction

Differen

0 Final Projober 2012

Modellingw chart besful system

eters will bes to determhat was cons will be us

nt simulation

ject Docum

approacelow showsms dynamice determineine the rang

ollected throsed to in co

n results wi

ment

ch the steps

cs model. Ted using indges for the ough informnjunction w

ll be genera

Figure 6

that are foThe first stedustrial engparametersmal time a

with the rand

ated by allo

6: Simulation a

ollowed wheep which isineering tecs and distriband motiondom functio

wing differe

pproach 

en develops to determchniques anbutions will studies thn from the e

ent producti

Diffebe diffeordeunemacabse

P

ping in desimine the simnd the secobe estimate

hereafter sexcel functi

on scenario

erent simugenerated

erent produer sizes axpected va

chine failuenteeism

age | 29

igning a mulation ond step ed using tatistical ons.

os:

lation resuby implem

uction and and also inariation indu

res and

ults will menting varying ncludes uced by

worker

BPJ 4210 Octo

8.2 AThe moand excprocesshow mu

Figure 7: C

The abfollowused

Figure 8: S

The simin the packag

0 Final Projober 2012

Analysis podel will be cludes soms steps in ouch waste is

Causal relation

ove diagrawing diagrad in analysin

Stock and flow

mulation moappendix. ing and pro

ject Docum

parametebased on t

me of the faorder to highs produced

nship diagram 

m above sam is a mong the produ

w diagram 

odel depicteThe mode

ocessing ma

ment

ers of the he productiactors incluhlight the ain productio

hows the cdified versiuction and p

ed by the exl shows thaterial.

model on sector m

uded in themount of mon.

causal relaton of the mprocessing

xcel derivedhe inputs a

model but we model andmaterial use

ionship momodel abovline of the h

d stock andand output

will be altered also includ per mach

odel in the fve. It has behandy Andy

d flow diagraprocesses

P

ed to excludude the prohine and to

factory modeen modifiey product lin

am will be iand steps

age | 30

de some oduction indicate

del. The ed to be ne.

included s of the

BPJ 4210 Octo

8.3 InDesigniof the ebeing pbased model aspace dynami

8.3.1 The follavailabhours. Tgraph isthe sec

Figure 9: W

8.3.1.1 White bcolour. simulateconsumthe invebottle w

No of bottle

 pallets

in Inventory

0 Final Projober 2012

nventory ing a warehexpected inproduced inon the sysaims to simrequiremencs model.

Loading blowing graple at everyThe consums for the whond graph a

White bottle in

Analysingbottles usedThe graphed for a pe

mption and entory was was used or

0

20

40

60

80

100

120

140

160

1 8 15

White

ject Docum

Calculatihouse for anventory levn the factorstems dynamulate the mnts will be

bay space rphs represey hour durinmption of bohite bottlesare the lave

nventory 

g of the resud to packag simulatingriod of 197 refilling of tnot being cor production

15 22 29 36 43

White

e bottle invent

ment

ions fast paced

vels and is ry. The apmics mode

maximum rashown usi

requiremeent the estimng productiottles is dep, which is uender bottle

ults: ge handy A the expechours. The

the inventoonsumed e had stoppe

43 50 57 64 71

e bottle in

tory (in pallet

d manufactugreatly affe

pproximatioel that was ack space aing graphs

ent for whimated expeon. The tim

pendent on used in the es which are

Andy are cocted inventoe constant dry with the ither becaued due to m

78 85 92 99

Time 

ventory (i

s)

uring firm reect by the fn or calculdeveloped

and pallet sthat were

ite bottles ected numbme is in howhich variamajority of

e used in th

onsumed mory levels fodrops and rhorizontal se a varian

mechanical f

106

113

120

127

(hrs)

in pallets)

equires intefact that difation of the

d to analysespace requ

extracted

 er of bottle

ours and eaant is being f the variane Lavender

more than bor Handy Arising in thesteps show

nt requiring afailures and

134

141

148

155

162

)

P

ense undersfferent variae inventorye the systeired. The infrom the s

pallets thaach shifts produced. ts producedr variant.

bottles of anAndy. Produe graphs shwing a perioa different c

d maintenan

162

169

176

183

190

age | 31

standing ants are y will be em. The nventory systems

at will be lasts 12 The first d and in

ny other uction is hows the od when coloured nce.

190

197

BPJ 4210 Octo

8.3.2 The gra(64 x2)

The gradelivere

8.3.2.1 The grachangeThat m80 bottl

0

10

20

30

40

50

60

70

80

0 Final Projober 2012

Loading baph shows of 128 palle

aph shows ted when inv

Analysis oaph shows

es, the maxieans that laes stacked

1 4 7 10

ject Docum

bay space rthe behavi

ets is delive

the inventoventory leve

of results: that when

imum palletavender botwo pallets

13 16 19 22 2

La

ment

 requiremeour of the

ered when i

Figure 10: 

ry levels wiel is less tha

production ts of lavend

ottles for Has high, mean

5 28 31 34 37

avender 

ent for Lavinventory unventory lev

Lavender Bottl

ith the assuan 10 pallets

runs for 7der bottles wandy Andy cning 40 load

40 43 46 49 5

Bottle 

vender Botunder the asvels reach 3

le inventory 

umption thats.

7 hours allwould be incan be alloding bay sp

2 55 58 61 64

invento

ttle inventossumption 30 pallets.

t a truck loa

owing for bn the warehocated a bapace.

67 70 73 76

ory

P

ory that two tru

ad of 64 pa

breakdownshouse is 75y storage s

LavenBottleinvent

age | 32

uck load

llets are

s variant 5 pallets. space of

nder e tory

BPJ 4210 Octo

8.3.3 This grcaps an

0

1

2

3

4

5

6

7

8

9

1 15

0 Final Projober 2012

Rack spacraph which nd the wrap

15 29 43 57 71

H/A wraplastic inH/A cap

ject Docum

ce requiremis similar t

pping plastic

Fi

85 99 113

127

apping nventorys inventory

ment

ment to the precc.

igure 11: Wrap

141

155

169

183

197

ceding grap

pping Plastic an

197

211

225

239

253

phs shows

d Caps invento

267

281

295

309

the invento

ory 

323

337

351

365

379

P

ories of han

379

393

407

421

435

age | 33

nd Andy

449

463

477

491

BPJ 4210 Octo

8.3.4 The grathe comHandy A

Figure 12:

Not all the tota

8.3.4.1 The gravariantsbe pachaving

0

2

4

6

8

10

12

14

16

1

0 Final Projober 2012

Packagingaph below mplication wAndy has s

:Cases Inventor

variants aral amount of

Analysis oaph shows s being prokaged in aa minimum

14 27 40 53 66

ject Docum

g Cases Invrepresents

with this graix variants a

ry 

e included f pallets tha

of Results that the in

duced in tha specific b

stock of te

66 79 92 105

118

H/A  varient 

H/A  varient 

ment

ventory the expect

aph is that and each ha

in the grapat will be in t

nventory of he Handy Aox. From tn pallets pe

118

131

144

157

170

A cases inven

C cases inven

ted inventoeach varia

as a differe

phs; the varthe wareho

the boxes Andy line. Ththe graph iter variant wo

170

183

196

209

222

ntory

ntory

ry levels foant has its ont casing.

riants will ause.

is highly shis is causet would beould be rea

235

248

261

274

or the casinown box w

all be includ

sensitive to ed by that e reasonablsonable saf

287

300

313

326

339

P

ng boxes inwith differen

ded when s

the changeach variane to conclufety stock.

339

352

365

378

391

age | 34

ventory, t labels.

umming

e in the nt has to ude that

391

404

417

430

BPJ 4210 Octo

8.3.5 The gramateria

Figure 13:

The valthen latThe tota

Figure 14:

0

2

4

6

8

10

12

14

16

18

1

0

5

10

15

20

25

30

35

40

45

1

0 Final Projober 2012

Raw Mateaph below

al used in Ha

: Raw material 

lues in the ter recalculal number o

: Total raw mat

15 29 43 57 71

R/M So

R/M Ku

R/M Ac

16 31 46 61 76

Tot

ject Docum

erial Invenshows the

andy Andy.

inventory 

graph wereated with t

of racks tha

terial inventory

71 85 99 113

127

da Ash INVEN

lu inventory

usol

76 91 106

121

136

Total r

ta raw materia

ment

ntory e estimatio The assum

e first obtainhe actual ct is required

141

155

169

183

NTORY

136

151

166

181

196

raw mate

al pallets inve

on of raw mmption is tha

ned by conconsumptiond for the sto

197

211

225

239

253

196

211

226

241

256

rial pallet

entory per hou

material invat the mater

nsulting withn of the maorage of raw

253

267

281

295

309

256

271

286

301

316

ts invento

ur 

ventories (rial will be u

h the peopleaterial at thw material is

309

323

337

351

365

316

331

346

361

376

ry per hou

P

in pallets) used for two

e in the stohe process s shown bel

379

393

407

421

391

406

421

436

ur 

age | 35

for raw o shifts.

ores and making. low.

435

449

463

477

491

451

466

481

496

491

BPJ 4210 Octo

8.3.6 The grwarehoassumein the raracks amateria

Figure 15:

8.3.7 With manumbernumberpurposeand pac

0

20

40

60

80

100

120

140

1

0 Final Projober 2012

Total Numraph belowouse for dured that theyacks. The

accommodaals are not in

: Total materia

Analysis oaterial usedr of pallets r of racks es it would ckaging ma

1 21 41 61 81

ject Docum

mber of Palw shows thration of 40y will be stograph does

ate two pallencluded in t

l inventory 

 of the resud in the Hanspace requthat can bbetter to st

aterial in the

101

121

141

161

181

Total nu

ment

llets in thehe average 0 shifts. Theored in bayss not represets. Also whthe graph.

ults ndy Andy pruired in thebe allocatetate that 17e Handy And

181

201

221

241

261

umber o

e warehounumber o

e graph does as compasent the numhat is to be

roduction line warehouseed to the h0 rack spacdy productio

261

281

301

321

341

of H/A p

use of expectedes not inclured to othember of rac noted is th

ne includede, a total o

handy Andyce need to on line.

361

381

401

421

pallets p

d pallets thde the paller material w

cks requiredhat the som

d in the calcof 135 racksy productiobe allocate

441

461

481

per hou

P

hat will beets for Bottwhich will bed since som

me of the pa

culation for s seem to ton line. Fo for the sto

r

Total numpallets pe

age | 36

e in the tles as it e stored

me of the ackaging

the total the best r safety ring raw

mber of er hour

BPJ 4210 Octo

8.3.8 With a truck thinventoAndy m

Figure 16:

8.3.9

It can bper twosince thdegree.

0

50

100

150

200

250

1

0 Final Projober 2012

Empty palschedule o

he followingry. The gra

making and p

:Empty Pallet in

Analysis o

be seen thato shifts it is he consum.

18 35 52 69

ject Docum

llets and wof an accumg graph waaph was copacking pro

nventory 

 of results 

t with the Hreasonable

mption rate

86 103

120

137

154

Empt

ment

waste manmulation of 2as generateonstructed ocesses.

 

andy Andy e to allocateof pallets

154

171

188

205

222

Emp

ty pallet inven

agement 200 pallets ed to investusing the p

production e a pallet sin the prod

222

239

256

273

290

pty pallet

ntoy

 inventory b

tigate the bpallets that

line produstorage of 2duction line

307

324

341

358

t invento

before the tbehaviour o

are consu

cing an ave250 pallets es does no

375

392

409

426

443

oy

P

trucks are tof the emptumed in the

erage of 210per produc

ot differ by

443

460

477

494

511

age | 37

aken by ty pallet

e Handy

0 pallets ction line

a large

511

528

545

562

579

596

BPJ 4210 Octo

8.4 WAfter throutingsimproveamountunloadi

In desig

8.4.1 • • • •

8.4.2 1.

2. 3. 4. 5. 6. •

8.4.3 The blosustainethe normseen la

0 Final Projober 2012

Warehoushe expecteds of the woes the flowt of materiang dock to

gning the wa

Storage deMaximise sMaximize eMaximize laProtection o

RequiremSufficient amanoeuvrinDocks to faSufficient aSufficient aSufficient aAn office toIn the desig

The blockock layout hed advantamal block later in the te

ject Docum

se layout d inventory orkflow had

w of the maal being hathe place o

are house t

esign consspace utilizaequipment uabour utilizaof all mater

ments for rearea to stageng of vehiclacilitate carrarea to pallearea for insparea to placeo house infogning of the

k layout has been in ages over itsayout will beext.

ment

optionslevels have

d been desaterial in thandled, the f use.

the storage

siderationsation utilization ation rails

eceiving e and spot es. rier unloadinetise or contpection of goe goods prio

ormation one a warehou

use in the s competine the first o

e been estisigned it ise warehousspace in b

design con

carriers – a

ng tainerise gooods or to dispat purchase p

use

warehouseg layout co

option but an

imated usins time to cse. The flo

between the

nsiderations

area for rece

oods

tching prior to disp

es for a longonfigurationsnother layo

ng systemsheck for th

ow is greatle isles, the

s are as follo

eption, wait

patching.

g time and s. For the ut will be su

P

dynamics he layout thly impacted distance f

ows:

ing, parking

has shown project the uggested a

age | 38

and the hat best d by the from the

g and

to have project,

s will be

BPJ 4210 Octo

8.4.4 The follresearclayout f

The wamateriadoes nobottles alternatformula

 

0 Final Projober 2012

The propolowing diag

ch to have afor its V-sha

arehouse laal that needot offer spaare stackedtive which

ated.

ject Docum

osed waregram illustraan advantagaped diagon

Fi

ayout has as to be sto

ace for loadd two palletcan accom

ment

house layoates a warege over the nal crosses

igure 17: Origin

an advantared the limiding bays wts high they

mmodate th

out house confbasic blockand horizon

nal Fishbone W

ge in that it to designwhich will by will not bee both the

figuration thk layout. Thntal and ver

Warehouse Layo

it maximize in the app

be used to e able to sit

loading ba

hat needs hhe layout is rtical interse

out 

es the distrlication of tstore bottlewell in the

ays and the

P

as been prcalled the fections of th

ribution ratethe project e pallets. S

racks theree racks ha

age | 39

roven by fishbone he isles.

e of the is that it ince the efore an

ad to be