Commissioning
Soc Trang Town Wastewater Treatment Plant Wastewater Disposal in Provincial Towns, Programme South Soc Trang, contract 2/2
WaRoTec Water and Pipeline Technology GmbH
Modified Operation Manual
20.06.2013
WASTEWATER TREATMENT PLANT
SOC TRANG TOWN - OPERATION MANUAL
Tender 2 - Lot 2
WaRoTec GmbH Water and Pipeline Technology
1 / 54
Table of content
1 Inlet chamber - “A”.................................................................................................... 2
2. Coarse Screen - “B” .................................................................................................... 3
3. Fine Screen - “D”......................................................................................................... 9
4. Grit Chamber - “E” .................................................................................................. 15
5. Venturi flume.............................................................................................................. 27
6. Primary sedimentation tank – “G”........................................................................... 28
7. Primary sludge pumping station – “K”.................................................................... 37
8. Open digestion ponds - “Q1” – “Q3” ...................................................................... 43
9. Sludge Drying Beds – “R1”-“R12” ........................................................................... 46
10. Sludge Water Pumping Station – “X”...................................................................... 48
11. Outlet (effluent) chamber – “Y” ............................................................................... 53
Commissioning
Soc Trang Town Wastewater Treatment Plant Wastewater Disposal in Provincial Towns, Programme South Soc Trang, contract 2/2
WaRoTec Water and Pipeline Technology GmbH
Modified Operation Manual
20.06.2013
WASTEWATER TREATMENT PLANT
SOC TRANG TOWN - OPERATION MANUAL
Tender 2 - Lot 2
WaRoTec GmbH Water and Pipeline Technology
2 / 54
1 Inlet chamber - “A”
1.1 General
The inlet structure of WWTP is divided by the concrete overflow weir into
the receiving and the conveying chambers.
The inlet chamber is the receiving structure of WWTP, the incoming waste
water from the pumping stations arrives here and is being conveyed via
concrete overflow weir to the main channel to the screening plant, which is
located downstream in direct vicinity to the inlet structure.
The inlet structure contains of an emergency overflow chamber, which is
connected via reinforced concrete pipe DN800 to the collecting manhole
downstream of primary sedimentation tanks. The main goal of the
emergency overflow chamber is to protect the WWTP structures located
further downstream against flooding.
1.2 Water levels
• 4,11 m Overflow weir receiving chamber
• 4,30 m max. W.L. receiving chamber
• 4,00 m Emergency overflow conveying chamber
• 3,83 m max. W.L. main conveying channel
Commissioning
Soc Trang Town Wastewater Treatment Plant Wastewater Disposal in Provincial Towns, Programme South Soc Trang, contract 2/2
WaRoTec Water and Pipeline Technology GmbH
Modified Operation Manual
20.06.2013
WASTEWATER TREATMENT PLANT
SOC TRANG TOWN - OPERATION MANUAL
Tender 2 - Lot 2
WaRoTec GmbH Water and Pipeline Technology
3 / 54
1.3 Control and Instrumentation Items
QA100S Stationary automatic sampler station No. 1
1.4 The Control System
1. Stationary automatic sampler – QA100S
• Automatic waste water sample collection for laboratory analysis
2. Penstock PEN-A-001 in the main conveying channel
• Manually operated, OPEN/CLOSE
• To shut off the discharge of influent waste water to the plant
2. Coarse Screen - “B”
2.1 General
Within the package unit XB100 coarse materials >=60mm are
automatically screened out of the raw wastewater. The screening is
transported by a belt conveyor into containers for disposal.
System XB100 includes two parallel channels. Each channel is equipped
with a coarse screen and manually activated inlet channel gates. In normal operation both screens are in operation. In case of emergency or
clogging of the coarse screens, water will be conveyed through the by-pass
channel equipped with a manually cleaned bar screen.
Each channel is equipped with manually operated inlet channel gate. A belt
conveyor conveys the screening into container for disposal.
Commissioning
Soc Trang Town Wastewater Treatment Plant Wastewater Disposal in Provincial Towns, Programme South Soc Trang, contract 2/2
WaRoTec Water and Pipeline Technology GmbH
Modified Operation Manual
20.06.2013
WASTEWATER TREATMENT PLANT
SOC TRANG TOWN - OPERATION MANUAL
Tender 2 - Lot 2
WaRoTec GmbH Water and Pipeline Technology
4 / 54
2.2 Water levels
1. Water levels upstream of coarse screens
• 3,74 m min W.L. at Qmin
• 3,82 m W.L. at Qdry
• 3,83 m max W.L. at Qmax
2. Water levels downstream coarse screens
• 3,54 m min W.L. at Qmin
• 3,62 m W.L. at Qdry
• 3,63 m max W.L. at Qmax
2.3 Motors
MB 101 Coarse Screen No. 1
MB 102 Coarse Screen No. 2
MB 103 Belt Conveyor
2.4 Control and Instrumentation Items
LB 101U Differential level ultrasonic sensor coarse screen No. 1
LB 102U Differential level ultrasonic sensor coarse screen No. 2
PEN-XB-001 – Penstock at the inlet to the by-pass channel
PEN-XB-002 – Penstock at the inlet to the screening channel 1
PEN-XB-003 – Penstock at the inlet to the screening channel 2
• Manually operated, OPEN/CLOSE
• To shut off the discharge of influent waste water to the screening
plant
Commissioning
Soc Trang Town Wastewater Treatment Plant Wastewater Disposal in Provincial Towns, Programme South Soc Trang, contract 2/2
WaRoTec Water and Pipeline Technology GmbH
Modified Operation Manual
20.06.2013
WASTEWATER TREATMENT PLANT
SOC TRANG TOWN - OPERATION MANUAL
Tender 2 - Lot 2
WaRoTec GmbH Water and Pipeline Technology
5 / 54
• To open the inlet of by-pass channel with the manually raked bar
screen in case of screening plant malfunction or maintenance
2.5 The Control System
1. Low Voltage Motor Control Centre : LV-MCC1
Package unit XB100 has its own control system which is
installed at LV-MCC1 consisting of following features for
each motor:
• Key selector switch “Manual” – “0” – “Auto”
• Pushbuttons “ON” and “OFF”
• Indicator lamps “RUN- GREEN”, “FAULT- RED”
• Ampere-meter
• Operation hours counter
2. Local Control Panels
The LV-MCC 1 is installed in the direct vicinity to the equipment to be
operated, therefore there is no need of any additional local control panels.
3. Emergency Pushbutton System
In case of emergency the complete screening plant could be immediately
stopped, by pressing of one of emergency switches:
• Main emergency pushbutton, located at LV-MCC1
• Emergency mushroom pushbutton XB100-ES1,located on the left
side of the coarse screen MB101 (looking at the coarse screens from
the front side)
Commissioning
Soc Trang Town Wastewater Treatment Plant Wastewater Disposal in Provincial Towns, Programme South Soc Trang, contract 2/2
WaRoTec Water and Pipeline Technology GmbH
Modified Operation Manual
20.06.2013
WASTEWATER TREATMENT PLANT
SOC TRANG TOWN - OPERATION MANUAL
Tender 2 - Lot 2
WaRoTec GmbH Water and Pipeline Technology
6 / 54
• Emergency mushroom pushbutton XB100-ES2, located on the right
side of the coarse screen MB102 (looking at the coarse screens from
the front side)
4. Alarm Acknowledgment System
In case of any emergency switch was pressed or any alarm (e.g. circuit
breaker trip, power cut off) occurs an alarm acknowledge is necessary. As
soon all the emergency switches are released, the cause of the alarm has
been found and fault has been eliminated, the operator has to press the
alarm acknowledgement button to confirm that the system is ready for
further operation. If the screens were in an intermediate position, the system
will bring the units to their respective home positions.
5. Differential Level Measurement System
Both coarse screens are equipped with their own differential level
measurement system, which features are:
• Measurement of waste water elevation up- and downstream of the
screens
• Adjustable control and monitoring functions
• Automatic control of the coarse screen (pre-set differential level
set-point)
• Recommended set-point – 15 cm
6. Operation in Automatic Mode
• Start by differential level
a) Screen is at the rest position
b) The differential level measurement system is in operation
Commissioning
Soc Trang Town Wastewater Treatment Plant Wastewater Disposal in Provincial Towns, Programme South Soc Trang, contract 2/2
WaRoTec Water and Pipeline Technology GmbH
Modified Operation Manual
20.06.2013
WASTEWATER TREATMENT PLANT
SOC TRANG TOWN - OPERATION MANUAL
Tender 2 - Lot 2
WaRoTec GmbH Water and Pipeline Technology
7 / 54
c) Differential level rises above set-point
d) Initiate screen operation
e) Differential level drops below set-point
f) Screen moves until the home position is reached and stops
• Start by time control or one cycle pushbutton
a) Screen is at the rest position
b) Differential level is below set-point for an adjustable period
of time (30-180 min) or one cycle pushbutton pressed
c) Time control / one cycle pushbutton override the differential
level measurement system
d) Initiate screen operation
e) One complete cleaning cycle is performed
f) Screen stops at home position
• Operation of the conveyor belt
a) Conveyor belt starts always when the screens are in operation
b) After screens stopped, conveyor belt will be switched off after
an adjustable time delay of 1 to 5 min.
7. Operation in Manual Mode
• The whole package unit could be operated manually from the
control cabinet LV-MCC1
• Turn the key selector switch to “Manual”
• Use the pushbutton “ON” to start the appropriate equipment
• Use the pushbutton “OFF” to stop the operation of the unit
Commissioning
Soc Trang Town Wastewater Treatment Plant Wastewater Disposal in Provincial Towns, Programme South Soc Trang, contract 2/2
WaRoTec Water and Pipeline Technology GmbH
Modified Operation Manual
20.06.2013
WASTEWATER TREATMENT PLANT
SOC TRANG TOWN - OPERATION MANUAL
Tender 2 - Lot 2
WaRoTec GmbH Water and Pipeline Technology
8 / 54
• This mode is only foreseen during maintenance works
8. Operation from MIMIC
• Remote control of the screens and of the conveyor belt
• Selector switch “Central Control OFF-Central Control ON”
• “ON” and “OFF” pushbuttons for each unit
• Central Control operation overrides AUTO mode
• Pre-condition: units are in AUTO mode
9. Interface to MIMIC – Package unit
• 3 x “Run” signal
• 3 x “Fault” signal
• 3 x “Auto” signal
• 1 x “Emergency stop” signal
• 1 x Incoming signal “Central Control OFF- Central Control
ON”
• 3 x Incoming “Start” command
• 3 x Incoming “Stop” command
Commissioning
Soc Trang Town Wastewater Treatment Plant Wastewater Disposal in Provincial Towns, Programme South Soc Trang, contract 2/2
WaRoTec Water and Pipeline Technology GmbH
Modified Operation Manual
20.06.2013
WASTEWATER TREATMENT PLANT
SOC TRANG TOWN - OPERATION MANUAL
Tender 2 - Lot 2
WaRoTec GmbH Water and Pipeline Technology
9 / 54
3. Fine Screen - “D”
3.1 General
Within the package unit XD100 the fine materials >=6 mm are
automatically screened out of the raw wastewater. The screening is
transported by a belt conveyor into container for disposal.
System XD100 includes two fine screens which are situated directly after
the coarse screens. Under normal conditions both screens are in operation.
In case of emergency or malfunction of the fine screens, water will be
conveyed through the by-pass channel equipped with a manually cleaned
bar screen. Each channel is equipped with manually activated outlet channel
gate.
A belt conveyor conveys the screening into container for disposal.
3.2 Water levels
1. Water levels upstream of fine screens
• 3,54 m min W.L. at Qmin
• 3,62 m W.L. at Qdry
• 3,63 m max W.L. at Qmax
2. Water levels downstream of fine screens
• 3,24 m min W.L. at Qmin
• 3,32 m W.L. at Qdry
• 3,33 m max W.L. at Qmax
Commissioning
Soc Trang Town Wastewater Treatment Plant Wastewater Disposal in Provincial Towns, Programme South Soc Trang, contract 2/2
WaRoTec Water and Pipeline Technology GmbH
Modified Operation Manual
20.06.2013
WASTEWATER TREATMENT PLANT
SOC TRANG TOWN - OPERATION MANUAL
Tender 2 - Lot 2
WaRoTec GmbH Water and Pipeline Technology
10 / 54
3.3 Motors
MD 101 - Fine Screen No. 1 MD102 - Fine Screen No. 2
MD103 - Belt Conveyor
3.4 Control and Instrumentation Items
LD 101U Differential level ultrasonic sensor fine screen No. 1 LD 102U Differential level ultrasonic sensor fine screen No. 2
PEN-XD-001 – Penstock at the outlet to the by-pass channel
PEN-XD-002 – Penstock at the outlet to the screening channel 1
PEN-XD-003 – Penstock at the outlet to the screening channel 2
• Manually operated, OPEN/CLOSE
• To shut off the discharge of screened waste water to the grit removal
plant
• To open the outlet of by-pass channel with the manually raked bar
screen in case of screening plant malfunction or maintenance
3.5 The Control System – Fine Screens
1. Low Voltage Motor Control Centre : LV-MCC1
Package unit XD100 has its own control system which is
installed at LV-MCC1 consisting of following features for
each motor:
• Key selector switch “Manual” – “0” – “Auto”
Commissioning
Soc Trang Town Wastewater Treatment Plant Wastewater Disposal in Provincial Towns, Programme South Soc Trang, contract 2/2
WaRoTec Water and Pipeline Technology GmbH
Modified Operation Manual
20.06.2013
WASTEWATER TREATMENT PLANT
SOC TRANG TOWN - OPERATION MANUAL
Tender 2 - Lot 2
WaRoTec GmbH Water and Pipeline Technology
11 / 54
• Pushbuttons “ON” and “OFF”
• Indicator lamps “RUN- GREEN”, “FAULT- RED”
• Ampere-meter
• Operation hours counter
2. Local Control Panels
The LV-MCC 1 is installed in the direct vicinity to the equipment to be
operated, therefore there is no need of any additional local control panels.
3. Emergency Pushbutton System
In case of emergency the complete screening plant could be immediately
stopped, by pressing of one of emergency switches:
• Main emergency pushbutton, located at LV-MCC1
• Emergency mushroom pushbutton XD100-ES1,located on the left
side of the fine screen MD101 (looking at the coarse screens from
the front side)
• Emergency mushroom pushbutton XD100-ES2, located on the right
side of the fine screen MD102 (looking at the coarse screens from
the front side)
4. Alarm Acknowledgment System
In case of any emergency switch was pressed or any alarm (e.g. circuit
breaker trip, power cut off) occurs an alarm acknowledge is necessary. As
soon all the emergency switches are released, the cause of the alarm has
been found and fault has been eliminated, the operator has to press the
alarm acknowledgement button to confirm that the system is ready for
further operation.
Commissioning
Soc Trang Town Wastewater Treatment Plant Wastewater Disposal in Provincial Towns, Programme South Soc Trang, contract 2/2
WaRoTec Water and Pipeline Technology GmbH
Modified Operation Manual
20.06.2013
WASTEWATER TREATMENT PLANT
SOC TRANG TOWN - OPERATION MANUAL
Tender 2 - Lot 2
WaRoTec GmbH Water and Pipeline Technology
12 / 54
5. Differential Level Measurement System
Both coarse screens are equipped with their own differential level
measurement system, which features are:
• Measurement of waste water elevation up- and downstream of the
screens
• Adjustable control and monitoring functions
• Automatic control of the fine screen (pre-set differential level set-
point)
• Recommended set-point – 15 cm
6. Operation in Automatic Mode
• Start by differential level
a) Screen is at the rest position
b) The differential level measurement system is in operation
c) Differential level rises above set-point
d) Initiate screen operation
e) Differential level drops below set-point
f) Screen continues its operation and after an adjustable time
delay of 1 to 5 min. stops
• Start by time control
a) Screen is at the rest position
b) Differential level is below set-point for an adjustable period
of time (30-180 min)
c) Time control overrides the different level measurement
system
Commissioning
Soc Trang Town Wastewater Treatment Plant Wastewater Disposal in Provincial Towns, Programme South Soc Trang, contract 2/2
WaRoTec Water and Pipeline Technology GmbH
Modified Operation Manual
20.06.2013
WASTEWATER TREATMENT PLANT
SOC TRANG TOWN - OPERATION MANUAL
Tender 2 - Lot 2
WaRoTec GmbH Water and Pipeline Technology
13 / 54
d) Initiate screen operation
e) Operation of the screen continues for an adjustable period of
time of 1 to 5 min.
f) Screen stops
* Operation of the conveyor belt
g) Conveyor belt starts always when the screens are in operation
h) After screens stopped, conveyor belt will be switched off after an .
…….adjustable time delay of 1 to 5 min
.
7. Operation in Manual Mode
• The whole package unit could be operated manually from the
control cabinet LV-MCC1
• Turn the key selector switch to “Manual”
• Use the pushbutton “ON” to start the appropriate equipment
• Use the pushbutton “OFF” to stop the operation of the unit
• This mode is only foreseen during maintenance works
8. Operation from MIMIC
• Remote control of the screens and of the conveyor belt
• Selector switch “Central Control OFF-Central Control ON”
• “ON” and “OFF” pushbuttons for each unit
• Central Control operation overrides AUTO mode
Commissioning
Soc Trang Town Wastewater Treatment Plant Wastewater Disposal in Provincial Towns, Programme South Soc Trang, contract 2/2
WaRoTec Water and Pipeline Technology GmbH
Modified Operation Manual
20.06.2013
WASTEWATER TREATMENT PLANT
SOC TRANG TOWN - OPERATION MANUAL
Tender 2 - Lot 2
WaRoTec GmbH Water and Pipeline Technology
14 / 54
• Pre-condition: units are in AUTO mode
9. Interface to MIMIC – Package unit
• 3 x “Run” signal
• 3 x “Fault” signal
• 3 x “Auto” signal
• 1 x “Emergency stop” signal
• 1x Incoming signal “Central Control OFF,Central Control ON”
• 3 x Incoming “Start” command
• 3 x Incoming “Stop” command
Commissioning
Soc Trang Town Wastewater Treatment Plant Wastewater Disposal in Provincial Towns, Programme South Soc Trang, contract 2/2
WaRoTec Water and Pipeline Technology GmbH
Modified Operation Manual
20.06.2013
WASTEWATER TREATMENT PLANT
SOC TRANG TOWN - OPERATION MANUAL
Tender 2 - Lot 2
WaRoTec GmbH Water and Pipeline Technology
15 / 54
4. Grit Chamber - “E”
4.1 General
The main goal of the package unit XE 100 is the removal of settled sand
within the grit chamber.
The grit chamber E is divided into two parallel tanks. The tanks are
equipped with manually operated penstocks at the inlet and with fixed
overflow weir at the outlet.
The grit chamber is equipped with a coarse bubble aeration system.
There is a travelling twin scraper bridge for grit removal, which is equipped
with two grit suction pumps (ME103 and ME104), one for each tank.
The grit is pumped from the bottom of the grit tanks by pumps ME103 and
ME104 into two separate sand traps located at the edge of each grit
chamber. The sand traps have drainage holes to discharge the drain water
back to the grit tanks. At the outlet side of each sand trap a weir with
channel gate is installed. The grit collected in the sand traps will be
removed manually into container for further disposal.
4.2 Water levels
1. Water levels in the grit removal tanks
• 3,24 m min W.L. at Qmin
• 3,32 m W.L. at Qdry
• 3,33 m max W.L. at Qmax
Commissioning
Soc Trang Town Wastewater Treatment Plant Wastewater Disposal in Provincial Towns, Programme South Soc Trang, contract 2/2
WaRoTec Water and Pipeline Technology GmbH
Modified Operation Manual
20.06.2013
WASTEWATER TREATMENT PLANT
SOC TRANG TOWN - OPERATION MANUAL
Tender 2 - Lot 2
WaRoTec GmbH Water and Pipeline Technology
16 / 54
2. Water levels in the outlet chamber of grit removal tanks
• 2,73 m min W.L. at Qmin
• 3,06 m W.L. at Qdry
• 3,10 m max W.L. at Qmax
4.3 Motors
ME101 Twin bridge drive ME102 Cable drum for bridge ME103 Submersible grit pump 1 ME104 Submersible grit pump 2
4.4 Control and Instrumentation Items
GE101 Limit switch for bridge position - start
GE102 Limit switch for bridge position – end of tank GE103 Wheel movement monitoring on one non driven bridge wheel
PEN-XE-001 – Penstock at the inlet to the grit chamber 1
PEN-XE-002 – Penstock at the inlet to the grit chamber 2
• Manually operated, OPEN/CLOSE
• To shut off the discharge of screened waste water to the grit removal
chambers
Commissioning
Soc Trang Town Wastewater Treatment Plant Wastewater Disposal in Provincial Towns, Programme South Soc Trang, contract 2/2
WaRoTec Water and Pipeline Technology GmbH
Modified Operation Manual
20.06.2013
WASTEWATER TREATMENT PLANT
SOC TRANG TOWN - OPERATION MANUAL
Tender 2 - Lot 2
WaRoTec GmbH Water and Pipeline Technology
17 / 54
4.5 The Control System – Scraper bridge XE100
The package unit XE 100 will be installed as a complete system. The unit
will have its own process control system within the local switch board
installed directly on the bridge. In case of failure of the single units within
the package unit the bridge will be stopped and a “Fault” signal is
transferred to the control room.
1. Main control switchboard
• Main power switch combining emergency and repair switch
function with padlock at the panels front site
• Voltmeter for the incoming power supply
• Key-switch for “Manual”- “O”- “Automatic” mode
• Selector switch for the operation mode of the grit pumps
“Pump 1”-“Pump 2” – “Both pumps”
• “Start” push button (green illuminated) for automatic operation
mode
• “Alarm acknowledge” pushbutton
• “Lamp test” pushbutton
• Amperemeter for each pump
• Operation hours counter for each motor
• Wheel monitoring fault lamp
• “Start” and “End” position indication lamps
Commissioning
Soc Trang Town Wastewater Treatment Plant Wastewater Disposal in Provincial Towns, Programme South Soc Trang, contract 2/2
WaRoTec Water and Pipeline Technology GmbH
Modified Operation Manual
20.06.2013
WASTEWATER TREATMENT PLANT
SOC TRANG TOWN - OPERATION MANUAL
Tender 2 - Lot 2
WaRoTec GmbH Water and Pipeline Technology
18 / 54
• Control elements for each motor, see table below
Motor control elements of the scraper bridge XE100
Local panel of scraper bridge XE100 Push buttons (for manual mode only)
Drive Lamps (green=active, red=alarm)
ME 101 Green Red Start forward Start backward
Stop ME 101 Green Red ME 103 grit pump Green Red Start Stop ME 104 grit pump Green Red
2. Local Control Panels
The control switchboard is installed directly on the twin bridge, therefore
there is no need of any additional local control panels.
3. Emergency Pushbutton System
In case of emergency the twin bridge could be immediately stopped, by
pressing the one of emergency switches:
• Main emergency / repair switch, located directly at the control board
• Emergency mushroom pushbutton XE100-ES1,located at the
entrance to the bridge
4. Alarm Acknowledgment System
In case of any emergency switch was pressed or any alarm (e.g. circuit
breaker trip, power cut off) occurs an alarm acknowledge is necessary. As
soon all the emergency switches are released, the cause of the alarm has
been found and fault has been eliminated, the operator has to press the
alarm acknowledgement button to confirm that the system is ready for
Commissioning
Soc Trang Town Wastewater Treatment Plant Wastewater Disposal in Provincial Towns, Programme South Soc Trang, contract 2/2
WaRoTec Water and Pipeline Technology GmbH
Modified Operation Manual
20.06.2013
WASTEWATER TREATMENT PLANT
SOC TRANG TOWN - OPERATION MANUAL
Tender 2 - Lot 2
WaRoTec GmbH Water and Pipeline Technology
19 / 54
further operation. If the bridge is in an intermediate position, the operator
has to bring the unit to its respective start position.
5. Proximity switches / Wheel monitoring
The twin bridge is equipped with two proximity limit switches and non-
driven wheel monitoring system. These sensors are used for:
• Recognition of the start and end position of the bridge
• Monitoring of the bridge movement and alarm function. In case that
the bridge is in operation (Automatic Or Manual) and no movement
is indicated, all the motors will be immediately stopped and alarm
signal is displayed
6. Operation in Automatic Mode
• Initial start from home position
a) Bridge at the home position (GE101), indication by the
appropriate “Start position” lamp
b) Key selector switch on “Automatic”
c) The grit pumps ME103 and ME104 are pre-selected,
according to the ongoing operation conditions
d) No alarms are indicated
e) Initiate the start of the bridge by pressing the illuminated
pushbutton “Start”
f) The “Start” pushbutton will light on to indicate that the
command has been accepted
g) Twin bridge motor ME101 will start operation for the
forward movement
h) Cable drum motor ME102 will start operation together with
ME101 to keep the cable under certain tension
Commissioning
Soc Trang Town Wastewater Treatment Plant Wastewater Disposal in Provincial Towns, Programme South Soc Trang, contract 2/2
WaRoTec Water and Pipeline Technology GmbH
Modified Operation Manual
20.06.2013
WASTEWATER TREATMENT PLANT
SOC TRANG TOWN - OPERATION MANUAL
Tender 2 - Lot 2
WaRoTec GmbH Water and Pipeline Technology
20 / 54
i) Grit pumps ME103 and ME104 will start operation according
to the pre-selection
j) Twin bridge will continue moving until the stop position is
reached (GE102), indicated by the appropriate “End position”
lamp
• End position
a) “End position” is reached (GE102), indicated through
appropriate lamp
b) Twin bridge motor ME101 and cable drum motor ME102 will
be switched off
c) Grit pumps ME103 and ME104 will be switched off
d) An adjustable on-delay timer (1 – 6 h) for the back to “Start
position” starts
• Back to start movement
a) As soon the delay time is elapsed or the “Start” illuminated
pushbutton is pressed by the operator the back to “Start
position” movement is initiated
b) Twin bridge motor ME101 will start operation for the
backward movement
c) Cable drum motor ME102 will start operation together with
ME101 to keep the cable under certain tension
d) Grit pumps ME103 and ME104 will start operation according
to the pre-selection
e) Twin bridge will continue moving until the stop position is
reached (GE101), indicated by the appropriate “Start
position” lamp
f) All motors will be stopped and the on-delay timer (1 – 6 h)
will be started again for the next automatic start
Commissioning
Soc Trang Town Wastewater Treatment Plant Wastewater Disposal in Provincial Towns, Programme South Soc Trang, contract 2/2
WaRoTec Water and Pipeline Technology GmbH
Modified Operation Manual
20.06.2013
WASTEWATER TREATMENT PLANT
SOC TRANG TOWN - OPERATION MANUAL
Tender 2 - Lot 2
WaRoTec GmbH Water and Pipeline Technology
21 / 54
7. Operation in Manual Mode
• The package unit could be operated manually from the control
cabinet located directly on the bridge
• Turn the key selector switch to “Manual”
• Use the pushbutton “ON” to start the appropriate equipment
• Press “Start forward” or “Start backward” pushbutton to move
the bridge in the direction needed
• Use the appropriate “OFF” pushbuttons to stop the operation
of the units
• This mode is only foreseen during maintenance works
8. Operation from MIMIC
• Remote control of the twin bridge
• Selector switch “Central Control OFF-Central Control ON”
• “ON” pushbutton has the same function as the “Start”
illuminated pushbutton at the local switchboard on the bridge
• “OFF” pushbutton stops all the motors of the bridge at the same
time
• Central Control operation overrides AUTO mode
• Pre-condition: units are in AUTO mode
Commissioning
Soc Trang Town Wastewater Treatment Plant Wastewater Disposal in Provincial Towns, Programme South Soc Trang, contract 2/2
WaRoTec Water and Pipeline Technology GmbH
Modified Operation Manual
20.06.2013
WASTEWATER TREATMENT PLANT
SOC TRANG TOWN - OPERATION MANUAL
Tender 2 - Lot 2
WaRoTec GmbH Water and Pipeline Technology
22 / 54
9. Interface to MIMIC – Whole package unit
• “Run” signal
• “Fault” signal – collective fault
• “Auto” signal
• “Emergency stop” signal
• Incoming signal “Central Control OFF- Central Control ON”
• Incoming “Start” command
• Incoming “Stop” command
4.6 Coarse Air Buble Aeration System – Air Blower Station
DRW. No. D 10 R 404 sheet 1 to 3 of 3
The coarse air bubble aeration system consist of :
• air blower station – two air blower
( one in operation and one stand-by )
• main air supply pipe – DN 80
• air distribution pipes DN 25 into each grit removal tank
• each air distribution pipe is equipped with one manual operated ball
valve DN 25
1. Motors and Local Control Panels.
ME 201 Air Blower No. 1 with LCP ME 201Q
Commissioning
Soc Trang Town Wastewater Treatment Plant Wastewater Disposal in Provincial Towns, Programme South Soc Trang, contract 2/2
WaRoTec Water and Pipeline Technology GmbH
Modified Operation Manual
20.06.2013
WASTEWATER TREATMENT PLANT
SOC TRANG TOWN - OPERATION MANUAL
Tender 2 - Lot 2
WaRoTec GmbH Water and Pipeline Technology
23 / 54
ME 202 Air Blower No. 2 with LCP ME 202 Q
2. Control and Instrumentation Items
ME 201 Air Blower No. 1
• ME 201 T Motor Temperature Protection
• ME 201 H Anti-condensation Heater
ME 202 Air Blower No. 2
• ME 202 T Motor Temperature Protection
• ME 202 H Anti-condensation Heater
3. The Control System
3.1 Low Voltage Motor Control Centre : LV-MCC2
The control system of the air blower station station
‘ is installed at LV-MCC2 and contains of following
……….features for each motor:
• Key selector switch “Manual” – “0” – “Auto”
• Pushbuttons “ON” and “OFF”
• Indicator lamps “RUN- GREEN”, “FAULT- RED”
• Ampere meter
• Operation hours counter
Commissioning
Soc Trang Town Wastewater Treatment Plant Wastewater Disposal in Provincial Towns, Programme South Soc Trang, contract 2/2
WaRoTec Water and Pipeline Technology GmbH
Modified Operation Manual
20.06.2013
WASTEWATER TREATMENT PLANT
SOC TRANG TOWN - OPERATION MANUAL
Tender 2 - Lot 2
WaRoTec GmbH Water and Pipeline Technology
24 / 54
3.2 Local Control Panels
The local control panels are installed in the direct vicinity to the
……….equipment to be operated and include following control and
……….indication elements:
• Key selector switch “Manual” – “0” – “Auto”
• Illuminated “ON-GREEN” pushbutton
• “OFF” pushbutton
• Indicator lamp “FAULT- RED”
3.3 Emergency Pushbutton System
In case of emergency the sludge the air blower station could be
……….immediately stopped, by pressing of the emergency switch
………foreseen:
• Main emergency mushroom switch, located directly at air blower
station
Commissioning
Soc Trang Town Wastewater Treatment Plant Wastewater Disposal in Provincial Towns, Programme South Soc Trang, contract 2/2
WaRoTec Water and Pipeline Technology GmbH
Modified Operation Manual
20.06.2013
WASTEWATER TREATMENT PLANT
SOC TRANG TOWN - OPERATION MANUAL
Tender 2 - Lot 2
WaRoTec GmbH Water and Pipeline Technology
25 / 54
3.3 Alarm Acknowledgment System
In case of any emergency switch was pressed or any alarm (e.g. circuit
…..breaker trip, power cut off) occurs an alarm acknowledge is necessary.
…. As soon all the emergency switches are released, the cause of the alarm
…. has been found and fault has been eliminated, the operator has to press
…. the alarm acknowledgement button to confirm that the system is ready
…. for further operation.
3.4 Operation in Automatic Mode
a) One air blower in operation and one stand-by
b) Air blowers are operated within pre-set running hours to assure
equal operation hours for each pump.
c) In case of no permanent inlet flow, operator has possibility to setting
value trigger “Quiet Level” and air blower will be run depending from inlet
flow.
d) If air blower fails to operate, it will be automatically locked out and
. alarm signal will be given
e) Stand-by air blower automatically takes the place of the failed one
f) The operation of the air blower is protected by the motor temperature
. protection
3.5 Operation in Manual Mode
• The air blowers could be operated manually from the motor
control centre LV-MCC2 or from the local control panels
• Turn the key selector switch to “Manual”
• Use the pushbutton “ON” to start the appropriate equipment
Commissioning
Soc Trang Town Wastewater Treatment Plant Wastewater Disposal in Provincial Towns, Programme South Soc Trang, contract 2/2
WaRoTec Water and Pipeline Technology GmbH
Modified Operation Manual
20.06.2013
WASTEWATER TREATMENT PLANT
SOC TRANG TOWN - OPERATION MANUAL
Tender 2 - Lot 2
WaRoTec GmbH Water and Pipeline Technology
26 / 54
• Use the pushbutton “OFF” to stop the operation of the unit
• This mode is only foreseen during maintenance works
3.6 Operation from MIMIC
• Remote control of the air blowers
• Selector switch “Central Control OFF-Central Control ON”
• “ON” and “OFF” pushbuttons for each unit
• Central Control operation overrides AUTO mode
• Pre-condition: units are in AUTO mode
3.7 Interface to MIMIC
• 2 x “Run” signal
• 2 x “Fault” signal
• 2 x “Auto” signal
• 1 x “Emergency stop” signal
• 1 x Incoming signal “Central Control OFF- Central Control
ON”
• 2 x Incoming “Start” command
• 2 x Incoming “Stop” command
Commissioning
Soc Trang Town Wastewater Treatment Plant Wastewater Disposal in Provincial Towns, Programme South Soc Trang, contract 2/2
WaRoTec Water and Pipeline Technology GmbH
Modified Operation Manual
20.06.2013
WASTEWATER TREATMENT PLANT
SOC TRANG TOWN - OPERATION MANUAL
Tender 2 - Lot 2
WaRoTec GmbH Water and Pipeline Technology
27 / 54
5. Venturi flume
5.1 General
The Khafagi-Venturi flume is installed in the outlet collection channel of
grit removal chamber. Together with the ultrasonic sensor and transmitter
units this flume forms the incoming waste water flow measurement system.
The waste water elevation in the flume is measured by the ultrasonic sensor
and then the measured level is being recalculated into the actual flow, using
the pre-programmed linearization tables.
5.2 Water levels
1. Water level in outlet channel of grit chamber
• 2,73 m min W.L. at Qmin
• 3,06 m W.L. at Qdry
• 3,10 m max W.L. at Qmax
2. Water level downstream of the Venturi flume
• 2,38 m min W.L. at Qmin
• 2,41 m W.L. at Qdry
• 2,43 m max W.L. at Qmax
5.3 Control and Instrumentation Items
FE100U Ultrasonic measurement system
Commissioning
Soc Trang Town Wastewater Treatment Plant Wastewater Disposal in Provincial Towns, Programme South Soc Trang, contract 2/2
WaRoTec Water and Pipeline Technology GmbH
Modified Operation Manual
20.06.2013
WASTEWATER TREATMENT PLANT
SOC TRANG TOWN - OPERATION MANUAL
Tender 2 - Lot 2
WaRoTec GmbH Water and Pipeline Technology
28 / 54
5.4 The Control System
The measured flow value and the totalized volume of incoming waste water
during the day are registered and indicated at Central Control Room.
6. Primary sedimentation tank – “G”
6.1 General
The main goal of the package unit XG 100 is to reduce the amount of
organic matter in the waste water by means of sedimentation.
The primary sedimentation tank G is divided into two parallel rectangular
chambers G1 + G2. At the inlet of each chamber a manually operated
penstock is installed. The distribution of the incoming waste water will be
done by series of Stengel pipes DN250, equipped with deflectors. At the
outlet the overflow weirs are provided, and the effluent waste water is
collected by one collection outlet channel.
There is one travelling twin-scraper bridge for removal of primary sludge
from the bottom of the chambers as well as for removal of floating
scum/grease from the surface, which is equipped with two bottom scraper s
and two surface scum shields, a pair for each chamber.
At the inlet chamber of the primary sedimentation tank the pH and
temperature measurement system QG101Z is installed.
Commissioning
Soc Trang Town Wastewater Treatment Plant Wastewater Disposal in Provincial Towns, Programme South Soc Trang, contract 2/2
WaRoTec Water and Pipeline Technology GmbH
Modified Operation Manual
20.06.2013
WASTEWATER TREATMENT PLANT
SOC TRANG TOWN - OPERATION MANUAL
Tender 2 - Lot 2
WaRoTec GmbH Water and Pipeline Technology
29 / 54
6.2 Water levels
1. Water level in inlet chamber of primary sedimentation tank
• 2,38 m min W.L. at Qmin
• 2,41 m W.L. at Qdry
• 2,43 m max W.L. at Qmax
2. Water level in primary sedimentation tanks
• 2,37 m min W.L. at Qmin
• 2,38 m W.L. at Qdry
• 2,40 m max W.L. at Qmax
3. Water level over the PST effluent weirs
• 2,37 m min W.L. at Qmin
• 2,38 m W.L. at Qdry
• 2,40 m max W.L. at Qmax
4. Water level in the PST effluent trough
• 1,86 m min W.L. at Qmin
• 2,18 m W.L. at Qdry
• 2,24 m max W.L. at Qmax
Commissioning
Soc Trang Town Wastewater Treatment Plant Wastewater Disposal in Provincial Towns, Programme South Soc Trang, contract 2/2
WaRoTec Water and Pipeline Technology GmbH
Modified Operation Manual
20.06.2013
WASTEWATER TREATMENT PLANT
SOC TRANG TOWN - OPERATION MANUAL
Tender 2 - Lot 2
WaRoTec GmbH Water and Pipeline Technology
30 / 54
6.3 Motors
MG101 twin bridge drive MG102 cable drum for bridge MG201 Gear motor lower sludge scraper, chamber 1 MG202 Gear motor upper scum scraper, chamber 1
MG203 Gear motor lower sludge scraper, chamber 2 MG204 Gear motor upper scum scraper, chamber 2
6.4 Control and Instrumentation Items
GG101 Limit switch for bridge position - start
GG102 Limit switch for bridge position – end of tank GG103 Wheel movement monitoring of one non driven bridge wheel
GG201 Limit switch lower sludge scraper UP, chamber 1
GG202 Limit switch lower sludge scraper DOWN, chamber 1
GG203 Limit switch upper scum scraper UP, chamber 1
GG204 Limit switch upper scum scraper DOWN, chamber 1
GG205 Limit switch lower sludge scraper UP, chamber 2
GG206 Limit switch lower sludge scraper DOWN, chamber 2
GG207 Limit switch upper scum scraper UP, chamber 2
GG208 Limit switch upper scum scraper DOWN, chamber 2
QG101Z Combined PH and temperature measurement
PEN-XG-001 – Penstock at the inlet to the PST chamber 1
PEN-XG-002 – Penstock at the inlet to the PST chamber 2
Commissioning
Soc Trang Town Wastewater Treatment Plant Wastewater Disposal in Provincial Towns, Programme South Soc Trang, contract 2/2
WaRoTec Water and Pipeline Technology GmbH
Modified Operation Manual
20.06.2013
WASTEWATER TREATMENT PLANT
SOC TRANG TOWN - OPERATION MANUAL
Tender 2 - Lot 2
WaRoTec GmbH Water and Pipeline Technology
31 / 54
• Manually operated, OPEN/CLOSE
• To shut off the discharge of waste water from grit removal to the
• primary sedimentation tank chambers
6.5 The Control System – Scraper bridge XG100
The package unit XG 100 will be installed as a complete system. The unit
will have its own process control system within the local switch board
installed directly on the bridge. In case of failure of a single units within the
package unit a “Fault” signal is transferred to the control room.
The switchboard of the package unit will consist of the following
configuration:
1. Main control switchboard
• Main power switch combining emergency and repair switch
function with padlock at the panels front site
• Voltmeter for the incoming power supply
• Key-switch for “Manual”- “O”- “Automatic” mode
• 2 selector switches for the operation mode of the sludge
scrapers and scum shields “OFF”-“Only sludge scraper”-
“Sludge scraper + Scum shields”
• “Start” push button (green illuminated) for automatic operation
mode
• “Alarm acknowledge” pushbutton
• “Lamp test” pushbutton
Commissioning
Soc Trang Town Wastewater Treatment Plant Wastewater Disposal in Provincial Towns, Programme South Soc Trang, contract 2/2
WaRoTec Water and Pipeline Technology GmbH
Modified Operation Manual
20.06.2013
WASTEWATER TREATMENT PLANT
SOC TRANG TOWN - OPERATION MANUAL
Tender 2 - Lot 2
WaRoTec GmbH Water and Pipeline Technology
32 / 54
• Operation hours counter for each motor
• Wheel monitoring fault lamp
• “Start” and “End” position indication lamps
• Control elements for each motor, see table below
•
Motor control elements of scraper bridge XG100
Local panel of scraper bridge XG100 Push buttons (for manual mode only)
Drive Lamps (green=active, red=alarm)
MG 101 Green Red Start forward Start backward
Stop MG 101 Green Red
Up 1) Down
1) MG 201 sludge scraper drive Green Red Up
1) Down 1) MG 202 scum shield drive Green Red
Up 1) Down
1) MG 203 sludge scraper drive Green Red Up
1) Down 1) MG 204 scum shield drive Green Red
(1) Push button has to be pressed continuously.
2. Local Control Panels
The control switchboard is installed directly on the twin bridge, therefore
there is no need of any additional local control panels.
3. Emergency Pushbutton System
In case of emergency the twin bridge could be immediately stopped, by
pressing the one of emergency switches:
• Main emergency / repair switch, located directly at the control board
Commissioning
Soc Trang Town Wastewater Treatment Plant Wastewater Disposal in Provincial Towns, Programme South Soc Trang, contract 2/2
WaRoTec Water and Pipeline Technology GmbH
Modified Operation Manual
20.06.2013
WASTEWATER TREATMENT PLANT
SOC TRANG TOWN - OPERATION MANUAL
Tender 2 - Lot 2
WaRoTec GmbH Water and Pipeline Technology
33 / 54
• Emergency mushroom pushbutton XG100-ES1, located at the
entrance to the bridge
4. Alarm Acknowledgment System
In case of any emergency switch was pressed or any alarm (e.g. circuit
breaker trip, power cut off) occurs an alarm acknowledge is necessary. As
soon all the emergency switches are released, the cause of the alarm has
been found and fault has been eliminated, the operator has to press the
alarm acknowledgement button to confirm that the system is ready for
further operation. If the bridge is in an intermediate position, the operator
has to bring the unit to its respective start position.
5. Proximity switches / Wheel monitoring
The twin bridge is equipped with several proximity limit switches and non-
driven wheel monitoring system. These sensors are used for:
• Recognition of the start and end position of the bridge
• Determining of the current sludge scraper and scum shield
positions, e.g. lifted up or lowered down
• Monitoring of the bridge movement and alarm function. In case that
the bridge is in operation (Automatic Or Manual) and no movement
is indicated, all the motors will be immediately stopped and alarm
signal is displayed
6. Operation in Automatic Mode
• Initial start from home position
Commissioning
Soc Trang Town Wastewater Treatment Plant Wastewater Disposal in Provincial Towns, Programme South Soc Trang, contract 2/2
WaRoTec Water and Pipeline Technology GmbH
Modified Operation Manual
20.06.2013
WASTEWATER TREATMENT PLANT
SOC TRANG TOWN - OPERATION MANUAL
Tender 2 - Lot 2
WaRoTec GmbH Water and Pipeline Technology
34 / 54
a) Bridge at the home position (GG101), indication by the
appropriate “Start position” lamp
b) Key selector switch on “Automatic”
c) The sludge scrapers and scum shields are pre-selected,
according to the ongoing operation conditions and lifted up,
which is determined by limit switches (GG201, GG203,
GG205, GG207)
d) No alarms are indicated
e) Initiate the start of the bridge by pressing the illuminated
pushbutton “Start”
f) The “Start” pushbutton will light on to indicate that the
command has been accepted
g) Twin bridge motor MG101 will start operation for the
forward movement
h) Cable drum motor MG102 will start operation together with
MG101 to keep the cable under certain tension
i) Sludge scrapers and scum shields will be kept in the upper
position
j) Twin bridge will continue moving until the stop position is
reached (GG102), indicated by the appropriate “End position”
lamp
• End position
a) “End position” is reached (GG102), indicated through
appropriate lamp
b) Twin bridge motor MG101 and cable drum motor MG102
will be switched off
c) As well sludge scrapers MG201 and MG203, as scum shields
MG202 and MG204 will be lowered, if pre-selected
accordingly
Commissioning
Soc Trang Town Wastewater Treatment Plant Wastewater Disposal in Provincial Towns, Programme South Soc Trang, contract 2/2
WaRoTec Water and Pipeline Technology GmbH
Modified Operation Manual
20.06.2013
WASTEWATER TREATMENT PLANT
SOC TRANG TOWN - OPERATION MANUAL
Tender 2 - Lot 2
WaRoTec GmbH Water and Pipeline Technology
35 / 54
• Back to start movement
a) As soon the pre-selected scrapers and shields are lowered,
which is determined by the limit switches (GG202, GG204,
GG206, GG208), the back to “Start position” movement is
initiated
b) Twin bridge motor MG101 will start operation for the
backward movement
c) Cable drum motor MG102 will start operation together with
MG101 to keep the cable under certain tension
d) While the bridge is moving backward, the sludge scrapers are
pushing the sludge, accumulated at the tank bottom, towards
the sludge hoppers, and the scum shields are gathering he
floating scum from the surface of the tanks and conveying it
to the scum tray
e) Twin bridge will continue moving until the stop position is
reached (GG101), indicated by the appropriate “Start
position” lamp
f) All motors will be stopped, the sludge scrapers and shields,
which were in operation will be lifted up and the on-delay
timer (1 – 6 h) will be started again for the next automatic
start
7. Operation in Manual Mode
• The package unit could be operated manually from the control
cabinet located directly on the bridge
• Turn the key selector switch to “Manual”
• Use the pushbutton “ON” to start the appropriate equipment
Commissioning
Soc Trang Town Wastewater Treatment Plant Wastewater Disposal in Provincial Towns, Programme South Soc Trang, contract 2/2
WaRoTec Water and Pipeline Technology GmbH
Modified Operation Manual
20.06.2013
WASTEWATER TREATMENT PLANT
SOC TRANG TOWN - OPERATION MANUAL
Tender 2 - Lot 2
WaRoTec GmbH Water and Pipeline Technology
36 / 54
• Press “Start forward” or “Start backward” pushbutton to move
the bridge in the direction needed
• To lower or to lift up the sludge scrapers and scum shields
press and keep pressed the appropriate pushbutton provided.
The motor will stop automatically, as soon the lower or upper
limits will be reached.
• Use the appropriate “OFF” pushbuttons to stop the operation
of the units / release the pushbutton for the lifting or lowering
the scrapers or scum shields
• This mode is only foreseen during maintenance works
8. Operation from MIMIC
• Remote control of the twin bridge
• Selector switch “Central Control OFF-Central Control ON”
• “ON” pushbutton has the same function as the “Start”
illuminated pushbutton at the local switchboard on the bridge
• “OFF” pushbutton stops all the motors of the bridge at the same
time
• Central Control operation overrides AUTO mode
• Pre-condition: units are in AUTO mode
9. Interface to MIMIC – Package unit
Commissioning
Soc Trang Town Wastewater Treatment Plant Wastewater Disposal in Provincial Towns, Programme South Soc Trang, contract 2/2
WaRoTec Water and Pipeline Technology GmbH
Modified Operation Manual
20.06.2013
WASTEWATER TREATMENT PLANT
SOC TRANG TOWN - OPERATION MANUAL
Tender 2 - Lot 2
WaRoTec GmbH Water and Pipeline Technology
37 / 54
• “Run” signal
• “Fault” signal – collective fault
• “Auto” signal
• “Emergency stop” signal
• Incoming signal “Central Control OFF- Central Control ON”
• Incoming “Start” command
• Incoming “Stop” command
10. PH and temperature measurement system
The measured values of the pH and of the temperature of incoming waste
water are registered and indicated at Central Control Room.
7. Primary sludge pumping station – “K”
7.1 General
Primary sludge pumping station is the key element of the sludge treatment
process of the WWTP. The primary sludge will be removed from the
primary sedimentation tank for further stabilization. Stabilized and
dewatered sludge is removed and transported for further disposal. The main
task of the primary sludge pumping station is to convey the sludge from the
pump sump to the anaerobic digestion ponds.
Commissioning
Soc Trang Town Wastewater Treatment Plant Wastewater Disposal in Provincial Towns, Programme South Soc Trang, contract 2/2
WaRoTec Water and Pipeline Technology GmbH
Modified Operation Manual
20.06.2013
WASTEWATER TREATMENT PLANT
SOC TRANG TOWN - OPERATION MANUAL
Tender 2 - Lot 2
WaRoTec GmbH Water and Pipeline Technology
38 / 54
The primary sludge pumping station consists of a pump sump and of an
operation building, where one macerator and three eccentric pumps are
installed, whereby one of them will be considered as a stand-by pump.
The pumps are operated according to the sludge level in the pump sump.
7.2 Water levels
1. Water level in the sludge water pump sump
• W.L. 1.7 m (3.00m) –MAX, Alarm
• W.L. 1.2 m (2.50m) –Start 2nd
pump
• W.L. 0.5 m (1.80m) –Start 1st pump
• W.L. -0.8 m (0.5m) – MIN, Stop the pump
• W.L. -1.0 m (0.3m) – MIN MIN, Stop the pump, Alarm
7.3 Motors
MK100 – Macerator
MK101 – Primary sludge eccentric pump № 1
MK102 – Primary sludge eccentric pump № 2
MK103 – Primary sludge eccentric pump № 3 (stand-by)
7.4 Control and Instrumentation Items
LK100HY – Hydrostatic level measurement system
QK100Z Combined PH and temperature measurement
FK100G - MID DN 150, primary sludge flow rate measurement
Commissioning
Soc Trang Town Wastewater Treatment Plant Wastewater Disposal in Provincial Towns, Programme South Soc Trang, contract 2/2
WaRoTec Water and Pipeline Technology GmbH
Modified Operation Manual
20.06.2013
WASTEWATER TREATMENT PLANT
SOC TRANG TOWN - OPERATION MANUAL
Tender 2 - Lot 2
WaRoTec GmbH Water and Pipeline Technology
39 / 54
GV-K-001 – Gate valve at primary sludge outlet, sludge hopper 1
GV-K-002 – Gate valve at primary sludge outlet, sludge hopper 2
GV-K-003 – Gate valve at primary sludge outlet, sludge hopper 3
GV-K-004 – Gate valve at primary sludge outlet, sludge hopper 4
• Manually operated, OPEN/CLOSE
• To withdraw the primary sludge from the sludge hoppers of the
primary sedimentation tank according to the pre-set time and volume
schedules
7.5 The Control System
1. Low Voltage Motor Control Centre : LV-MCC2
The control system of the primary sludge pumping station is
installed at LV-MCC2 and consists of following features for
each motor:
• Key selector switch “Manual” – “0” – “Auto”
• Pushbuttons “ON” and “OFF”
• Indicator lamps “RUN- GREEN”, “FAULT- RED”
• Ampere-meter
• Operation hours counter
Commissioning
Soc Trang Town Wastewater Treatment Plant Wastewater Disposal in Provincial Towns, Programme South Soc Trang, contract 2/2
WaRoTec Water and Pipeline Technology GmbH
Modified Operation Manual
20.06.2013
WASTEWATER TREATMENT PLANT
SOC TRANG TOWN - OPERATION MANUAL
Tender 2 - Lot 2
WaRoTec GmbH Water and Pipeline Technology
40 / 54
2. Local Control Panels
The local control panels are installed in the direct vicinity to the equipment
to be operated and include following control and indication elements:
• Key selector switch “Manual” – “0” – “Auto”
• Illuminated “ON” pushbutton
• “OFF” pushbutton
• Indicator lamp “FAULT- RED”
3. Emergency Pushbutton System
In case of emergency the primary sludge pumping station could be
immediately stopped, by pressing of the emergency switch foreseen:
• Emergency mushroom pushbutton, located on the appropriate free
accessible location n the pump hall of the pumping station
4. Alarm Acknowledgment System
In case of any emergency switch was pressed or any alarm (e.g. circuit
breaker trip, power cut off) occurs an alarm acknowledge is necessary. As
soon all the emergency switches are released, the cause of the alarm has
been found and fault has been eliminated, the operator has to press the
alarm acknowledgement button to confirm that the system is ready for
further operation.
Commissioning
Soc Trang Town Wastewater Treatment Plant Wastewater Disposal in Provincial Towns, Programme South Soc Trang, contract 2/2
WaRoTec Water and Pipeline Technology GmbH
Modified Operation Manual
20.06.2013
WASTEWATER TREATMENT PLANT
SOC TRANG TOWN - OPERATION MANUAL
Tender 2 - Lot 2
WaRoTec GmbH Water and Pipeline Technology
41 / 54
5. Level Measurement System
The hydrostatic level measurement system is installed in the pump sump of
the primary sludge pumping station. The main features of the system
comprise of:
• Measurement of sludge level inside of the pump sump
• Adjustable control and monitoring functions
• Dry running protection of the pumps
6. Operation in Automatic Mode
• Pump operation according to the pump sump level
a) Pumps are operated within pre-set running hours to assure
equal operation hours for each pump
b) If pump fails to operate, it will be automatically locked out
and alarm signal will be given
c) Stand-by pump automatically takes the place of the failed one
d) The control of the pumps depends on the current sludge level
in the buffer tank, measured by the level measurement system
LK100HY
e) The Schedule operating of the pump to get permission for run
pumps after time –“delay start run”. The setting “Duration run” to
end permission. Run time of pumps determinates of “Period run”
then the rest time determinates “Period run delay”.
f) If the condition for the start of the pumps is fulfilled, the
macerator starts as the first unit and an on-delay time of 15
sec is activated
Commissioning
Soc Trang Town Wastewater Treatment Plant Wastewater Disposal in Provincial Towns, Programme South Soc Trang, contract 2/2
WaRoTec Water and Pipeline Technology GmbH
Modified Operation Manual
20.06.2013
WASTEWATER TREATMENT PLANT
SOC TRANG TOWN - OPERATION MANUAL
Tender 2 - Lot 2
WaRoTec GmbH Water and Pipeline Technology
42 / 54
g) As soon the delay time has expired, the appropriate pump
starts operation
h) The operation of the pumps is protected by the level
measurement system LK100HY
7. Operation in Manual Mode
• The macerator and eccentric pumps could be operated
manually from the control cabinet LV-MCC2 or from the local
control panels
• Turn the key selector switch to “Manual”
• Use the pushbutton “ON” to start the appropriate equipment
• Use the pushbutton “OFF” to stop the operation of the unit
• The low level interlocks are active in Manual Mode
• This mode is only foreseen during maintenance works
8. Operation from MIMIC
• Remote control of the macerator and pumps
• Selector switch “Central Control OFF-Central Control ON”
• “ON” and “OFF” pushbuttons for each unit
• Central Control operation overrides AUTO mode
• Pre-condition: units are in AUTO mode
Commissioning
Soc Trang Town Wastewater Treatment Plant Wastewater Disposal in Provincial Towns, Programme South Soc Trang, contract 2/2
WaRoTec Water and Pipeline Technology GmbH
Modified Operation Manual
20.06.2013
WASTEWATER TREATMENT PLANT
SOC TRANG TOWN - OPERATION MANUAL
Tender 2 - Lot 2
WaRoTec GmbH Water and Pipeline Technology
43 / 54
• FK100G MID primary sludge flow rate indication :
- m3 / h
8. Open digestion ponds - “Q1” – “Q3”
8.1 General
The raw sludge from the primary sludge pumping station has still the
biological activity. For further treatment and final disposal the stabilization
of the sludge is indispensably required.
The sludge stabilization will be done by anaerobic digestion. The volume
required for this process will be provided by construction of the three open
digestion ponds.
The mechanical equipment of the digestion ponds contains of the sludge
feeding piping with distribution gate valves, digested sludge withdrawal
piping and of the telescopic valves for the supernatant removal.
The digested sludge will have a dry solids content of about 5% after
digestion time of 30 days. For the next treatment step (sludge dewatering)
the digested sludge will be conveyed to the drying beds by gravity.
Commissioning
Soc Trang Town Wastewater Treatment Plant Wastewater Disposal in Provincial Towns, Programme South Soc Trang, contract 2/2
WaRoTec Water and Pipeline Technology GmbH
Modified Operation Manual
20.06.2013
WASTEWATER TREATMENT PLANT
SOC TRANG TOWN - OPERATION MANUAL
Tender 2 - Lot 2
WaRoTec GmbH Water and Pipeline Technology
44 / 54
8.2 Water levels
1. Water levels at the sludge digestion ponds
9. Max W.L. 6.4 m
8.3 Motors
None
8.4 Control and Instrumentation Items
KV-Q1-001 – Knife gate valve for surplus water withdrawal pond “Q1”
KV-Q1-002 – Knife gate valve for surplus water withdrawal pond “Q1”
KV-Q1-003 – Knife gate valve for surplus water withdrawal pond “Q1”
GV-Q1-001 – Gate valve for raw sludge feeding pond “Q1”
GV-Q1-002 – Gate valve for raw sludge feeding pond “Q1”
GV-Q1-003 – Gate valve for raw sludge feeding pond “Q1”
GV-Q1-004 – Gate valve for raw sludge feeding pond “Q1”
GV-Q1-005 – Gate valve for digested sludge withdrawal pond “Q1”
KV-Q2-001 – Knife gate valve for surplus water withdrawal pond “Q2”
KV-Q2-002 – Knife gate valve for surplus water withdrawal pond “Q2”
KV-Q2-003 – Knife gate valve for surplus water withdrawal pond “Q2”
GV-Q2-001 – Gate valve for raw sludge feeding pond “Q2”
GV-Q2-002 – Gate valve for raw sludge feeding pond “Q2”
GV-Q2-003 – Gate valve for raw sludge feeding pond “Q2”
Commissioning
Soc Trang Town Wastewater Treatment Plant Wastewater Disposal in Provincial Towns, Programme South Soc Trang, contract 2/2
WaRoTec Water and Pipeline Technology GmbH
Modified Operation Manual
20.06.2013
WASTEWATER TREATMENT PLANT
SOC TRANG TOWN - OPERATION MANUAL
Tender 2 - Lot 2
WaRoTec GmbH Water and Pipeline Technology
45 / 54
GV-Q2-004 – Gate valve for raw sludge feeding pond “Q2”
GV-Q2-005 – Gate valve for digested sludge withdrawal pond “Q2”
KV-Q3-001 – Knife gate valve for surplus water withdrawal pond “Q3”
KV-Q3-002 – Knife gate valve for surplus water withdrawal pond “Q3”
KV-Q3-003 – Knife gate valve for surplus water withdrawal pond “Q3”
GV-Q3-001 – Gate valve for raw sludge feeding pond “Q3”
GV-Q3-002 – Gate valve for raw sludge feeding pond “Q3”
GV-Q3-003 – Gate valve for raw sludge feeding pond “Q3”
GV-Q3-004 – Gate valve for raw sludge feeding pond “Q3”
GV-Q3-005 – Gate valve for digested sludge withdrawal pond “Q3”
• Manually operated, OPEN/CLOSE
• To control the feeding and distribution of the raw sludge over the
digestion pond
• To withdraw the supernatant water from the surface of the pond
• To withdraw the digested sludge to the drying beds for dewatering
Commissioning
Soc Trang Town Wastewater Treatment Plant Wastewater Disposal in Provincial Towns, Programme South Soc Trang, contract 2/2
WaRoTec Water and Pipeline Technology GmbH
Modified Operation Manual
20.06.2013
WASTEWATER TREATMENT PLANT
SOC TRANG TOWN - OPERATION MANUAL
Tender 2 - Lot 2
WaRoTec GmbH Water and Pipeline Technology
46 / 54
9. Sludge Drying Beds – “R1”-“R12”
9.1 General
In order to reduce the volume of the digested sludge prior to the final
disposal the sludge dewatering is necessary.
Roof covered sludge drying beds are constructed, the sludge dewatering is
achieved by natural evaporation and with an aid of the drainage system. In
total twelve drying beds will be constructed, to provide the necessary
volume. The max. sludge filling height is 30 cm.
The structure of the drying bed comprises as well holding and separation
walls as permeable filtering layer (gravel, sand) of 20 cm thickness for the
removal of the sludge liquor via the drainage system.
9.2 Water levels
1. Water levels at the sludge drying beds
10. MAX W.L. 2.60 m
9.3 Motors
None
Commissioning
Soc Trang Town Wastewater Treatment Plant Wastewater Disposal in Provincial Towns, Programme South Soc Trang, contract 2/2
WaRoTec Water and Pipeline Technology GmbH
Modified Operation Manual
20.06.2013
WASTEWATER TREATMENT PLANT
SOC TRANG TOWN - OPERATION MANUAL
Tender 2 - Lot 2
WaRoTec GmbH Water and Pipeline Technology
47 / 54
9.4 Control and Instrumentation Items
GV-R1/2-001 – Gate valve for digested sludge feeding drying bed “R1”+
“R2”
GV-R3/4-001 – Gate valve for digested sludge feeding drying bed “R3”
+”R4”
GV-R5/6-001 – Gate valve for digested sludge feeding drying bed “R5”
+”R6”
GV-R7/8-001 – Gate valve for digested sludge feeding drying bed “R7”
+”R8”
GV-R9/10-001 – Gate valve for digested sludge feeding drying bed “R9”
+”R10”
GV-R11/12-001 – Gate valve for digested sludge feeding drying bed “R11”
+”R12”
GV-001-200 - Gate valve in the main collection discharge drainage pipe
‘ DN 200
• Manually operated, OPEN/CLOSE
• To control the feeding and distribution of the digested sludge over
the drying beds
• To withdraw the drainage water from the bottom of the drying beds
Commissioning
Soc Trang Town Wastewater Treatment Plant Wastewater Disposal in Provincial Towns, Programme South Soc Trang, contract 2/2
WaRoTec Water and Pipeline Technology GmbH
Modified Operation Manual
20.06.2013
WASTEWATER TREATMENT PLANT
SOC TRANG TOWN - OPERATION MANUAL
Tender 2 - Lot 2
WaRoTec GmbH Water and Pipeline Technology
48 / 54
10. Sludge Water Pumping Station – “X”
10.1 General
In order to withdraw the surplus water from the digestion ponds
and the drainage water from the sludge drying beds a sludge water
pumping station is foreseen.
The sludge water will be pumped into the inlet channel of the
Primary Sedimentation Tanks.
The sludge water pumping station is equipped with two submersible
‘ pumps, one in operation and one stand-by
10.2 Water level
Water level in the pump sump
• -1,00 m min min W.L. dry run protection, Alarm
• -1,50 m min W.L. stop pump operation
• +0,50 m max W.L. start pump operation
10.3 Motors and Local Control Panels
MX 101 Submersible pump No. 1 with LCP MX 101Q
MX 102 Submersible pump No. 2 with LCP MX 102 Q
Commissioning
Soc Trang Town Wastewater Treatment Plant Wastewater Disposal in Provincial Towns, Programme South Soc Trang, contract 2/2
WaRoTec Water and Pipeline Technology GmbH
Modified Operation Manual
20.06.2013
WASTEWATER TREATMENT PLANT
SOC TRANG TOWN - OPERATION MANUAL
Tender 2 - Lot 2
WaRoTec GmbH Water and Pipeline Technology
49 / 54
10.4 Control and Instrumentation Items
LX 101F Float level switch 1 : min min – dry rum protection, Alarm
LX 102F Float level switch 2 : min – stop pump operation
LX 103F Float level switch 3 : max – start pump operation
10.5 The Control System
1. Low Voltage Motor Control Centre : LV-MCC2
The control system of the sludge water pumping station is
installed at LV-MCC2 and contains of following features for
each motor:
• Key selector switch “Manual” – “0” – “Auto”
• Pushbuttons “ON” and “OFF”
• Indicator lamps “RUN- GREEN”, “FAULT- RED”
• Ampere meter
• Operation hours counter
Commissioning
Soc Trang Town Wastewater Treatment Plant Wastewater Disposal in Provincial Towns, Programme South Soc Trang, contract 2/2
WaRoTec Water and Pipeline Technology GmbH
Modified Operation Manual
20.06.2013
WASTEWATER TREATMENT PLANT
SOC TRANG TOWN - OPERATION MANUAL
Tender 2 - Lot 2
WaRoTec GmbH Water and Pipeline Technology
50 / 54
2. Local Control Panels
The local control panels are installed in the direct vicinity to the equipment
to be operated and include following control and indication elements:
• Key selector switch “Manual” – “0” – “Auto”
• Illuminated “ON-GREEN” pushbutton
• “OFF” pushbutton
• Indicator lamp “FAULT- RED”
3. Emergency Pushbutton System
In case of emergency the sludge water pumping station could be
immediately stopped, by pressing of the emergency switch foreseen:
• Main emergency mushroom switch, located directly at sludge water
pumping station
4. Alarm Acknowledgment System
In case of any emergency switch was pressed or any alarm (e.g. circuit
breaker trip, power cut off) occurs an alarm acknowledge is necessary. As
soon all the emergency switches are released, the cause of the alarm has
been found and fault has been eliminated, the operator has to press the
alarm acknowledgement button to confirm that the system is ready for
further operation.
Commissioning
Soc Trang Town Wastewater Treatment Plant Wastewater Disposal in Provincial Towns, Programme South Soc Trang, contract 2/2
WaRoTec Water and Pipeline Technology GmbH
Modified Operation Manual
20.06.2013
WASTEWATER TREATMENT PLANT
SOC TRANG TOWN - OPERATION MANUAL
Tender 2 - Lot 2
WaRoTec GmbH Water and Pipeline Technology
51 / 54
5. Level Measurement System
Three float level switches are installed in the pump sump of the sludge
water pumping station. The main features of the system comprise of:
• Measurement of sludge water level inside of the pump sump
• Adjustable control and monitoring functions
• Dry running protection of the pumps
6. Operation in Automatic Mode
11. Pump operation according to the level
a. Pumps are operated within pre-set running hours to assure equal
operation hours for each pump
b. If pump fails to operate, it will be automatically locked out and alarm
signal will be given
c. Stand-by pump automatically takes the place of the failed one
d. The control of the pumps depends solely on current liquid level in the
pump sump, determined by the level measurement system LX 101F –
102F – 103F
e. The operation of the pumps is protected by the level measurement
system
Commissioning
Soc Trang Town Wastewater Treatment Plant Wastewater Disposal in Provincial Towns, Programme South Soc Trang, contract 2/2
WaRoTec Water and Pipeline Technology GmbH
Modified Operation Manual
20.06.2013
WASTEWATER TREATMENT PLANT
SOC TRANG TOWN - OPERATION MANUAL
Tender 2 - Lot 2
WaRoTec GmbH Water and Pipeline Technology
52 / 54
7. Operation in Manual Mode
• The submersible pumps could be operated manually from the
control cabinet LV-MCC2 or from the local control panels
• Turn the key selector switch to “Manual”
• Use the pushbutton “ON” to start the appropriate equipment
• Use the pushbutton “OFF” to stop the operation of the unit
• The low level interlocks are active in Manual Mode
• This mode is only foreseen during maintenance works
8. Operation from MIMIC
• Remote control of the pumps
• Selector switch “Central Control OFF-Central Control ON”
• “ON” and “OFF” pushbuttons for each unit
• Central Control operation overrides AUTO mode
• Pre-condition: units are in AUTO mode
9. Interface to MIMIC
• 2 x “Run” signal
• 2 x “Fault” signal
Commissioning
Soc Trang Town Wastewater Treatment Plant Wastewater Disposal in Provincial Towns, Programme South Soc Trang, contract 2/2
WaRoTec Water and Pipeline Technology GmbH
Modified Operation Manual
20.06.2013
WASTEWATER TREATMENT PLANT
SOC TRANG TOWN - OPERATION MANUAL
Tender 2 - Lot 2
WaRoTec GmbH Water and Pipeline Technology
53 / 54
• 2 x “Auto” signal
• 1 x “Emergency stop” signal
• 1 x Incoming signal “Central Control OFF- Central Control
ON”
• 2 x Incoming “Start” command
• 2 x Incoming “Stop” command
11. Outlet (effluent) chamber – “Y”
11.1 General
The effluent pipe DN800 from the primary sedimentation tanks is
connected to the collecting manhole. From there the water is being
discharged via DN800 reinforced concrete pipe to the Maspero River.
11.2 Water levels
1. Water level in the collection manhole
• 1,86 m min W.L. at Qmin
• 2,18 m W.L. at Qdry
• 2,24 m max W.L. at Qmax
Commissioning
Soc Trang Town Wastewater Treatment Plant Wastewater Disposal in Provincial Towns, Programme South Soc Trang, contract 2/2
WaRoTec Water and Pipeline Technology GmbH
Modified Operation Manual
20.06.2013
WASTEWATER TREATMENT PLANT
SOC TRANG TOWN - OPERATION MANUAL
Tender 2 - Lot 2
WaRoTec GmbH Water and Pipeline Technology
54 / 54
2. Water level in the Maspero River
• 1,80 m max W.L.
11.3 Motors
None
11.4 Control and Instrumentation Items
QY100S Stationary automatic sampler station No. 2
11.5 The Control System
1. Stationary automatic sampler – QY100S
• Automatic waste water sample collection for laboratory analysis
Modified by Mr. Anatoliy Grebnev, Soc Trang, 20.06.2013