BATANG INTEGRATED INDUSTRIAL ESTATE
-
Upload
khangminh22 -
Category
Documents
-
view
5 -
download
0
Transcript of BATANG INTEGRATED INDUSTRIAL ESTATE
From Internasional Ahmad Yani
Airport
FromTanjung Emas
Port
50 KmFrom Jakarta
City
4 HoursFrom Semarang
City
1 Hours65 Km
BATANG INTEGRATED INDUSTRIAL ESTATE
R&D and
Comercial
ICT & Electronic
Warehousing
Industry
Cluster 2800 ha
Cluster 13.100 ha
Cluster 3400 ha
Phase 1450 ha
ToSemarang
ToJakarta Food & Beverage
Industry
Chemical
Industry
Cluster and Industrial Classification
Tol Road
Highway
Double Track
Electric networkConstruction inOktober 2020
Toll InterchangeKM 371+800
Construction is completeMarch 2021
Station and Dry PortConstruction in October 2020
Marketing GalleryConstruction is complete
Oktober 2020
Secondary Path 11.4 KmConstruction is complete
December 2020
Main road5.2 KmConstruction is complete
December 2020
PortConstruction in January 2021
Raw Water SupplyConstruction in January 2021
Temporary AccessClearing is Complete
Agustus 2020
Raw Water Treatment PlantConstruction in January 2021
WWTP, Sanitary LandfillConstruction in 2021
Timeline Infrastructure Phase 1 (450Ha)Supporting Facili ties and Regional Connectivity
Batang
Seaport
Tanjung Mas
SeaportKendal
SeaportToll Gate
Weleri
KM 384
Toll Gate 1
Km 372+200
(Plan)
Semarang
City
Seaport
Plan in Industrial Estate
±12 km
Toll gate Kandeman
KM 348
±12 km±12 km
1Toll Access
in
365 - 374
Zona 1Zona 2
Zona 3
Toll access postion towars area
Jarak antar SS dan
rest area sudah
memenuhi standar
Rest Area
KM 379 A
Rest Area
KM 360 B
>5 km
Area Facility
Toll Access
Toll Gate 2
(Plan)
Internal Area (Phase 1 450Ha)Road Network Plan
ROW 24
ROW 14
2.2
5
1 3.
5
1.
5
3.
50.
5
2.2
50.
5
2 1 0.5 3.5 3.5 0.5 1 2
3.
50.
5
0.
5
3.
5
1
ROW 40 Ultimate
ROW 40
FaseI
2.7 2.3 2.50.5
3.5 3.50.5
20.5
3.5 3.50.5
2.5 2.3 2.73.5 3.5
2.7 2.3 2.50.5
3.5 3.50.5
20.5
3.5 3.5 0.5 2.5 2.3 2.73.5 3.5