Annexure-A - WBSEDCL
-
Upload
khangminh22 -
Category
Documents
-
view
3 -
download
0
Transcript of Annexure-A - WBSEDCL
WBSEDCL
West Bengal State Electricity Distribution Company Limited•(A Government of West Bengal Enterprise)
(IT 86 Corrunuritcation Ce{1}Vidyut Bhavan,Std Floor, C&D Block, Bidhan Nagar, Block-DJ, Sec-Il,
Kolkata-700091Phone No.033-2358-9665, FAX No.033-2337-242] , 033-2358-9244
Website.. vanw.v¥bsedcl.in. e-mail.. [email protected]
Memo No: WBSEDCL/lT&C/33.10(iv)/ 3 ¥ 9 6
CORRIGENDUM V TO NIT
Date:d507.2021
Ref: Tender Notice No: WBSEDCL/ lT&C/ 33.10(iv)/3468, dated: 19.02.2021
The following changes are being incorporated in the NIT underteference. The changes are to be takeninto consideration at the time of submission of bids. The amended clauses and additional clauses arespecified hereunder: -
1. Modifications/ Corrections in NIT clauses Table: Annexure-A;2. Detailed description of all new clauses, Forms & Formats: Annexure-B;3. clarification on important Pre-bid queries: Annexure-C;
a 4. Reports: Annexure-D;
`,1
All other clauses and ann:xures remain unchanged of the original NIT.
1
(P. BhattachaoortyA
Chief EngineerlT&C Cell, WBSEDCL
Annexure-A Modifications/ Corrections in NIT:
Sl. No.
Tender Clause
Page No.
Description of clause Modified Clause
1 IB.4.3(A) 6 New Clause IB.4.3(A)(New Clause): The Bidder may seek qualification on the basis of technical and financial capability of its Parent(s) and/ or its Affiliate(s) for the purpose of meeting the qualification requirements. Authorization for use of such technical or financial capability shall have to be provided from its Parent(s) and/or Affiliate(s). The technical and financial capability of a particular entity, including its Parent(s) and/or Affiliate(s), shall not be used by more than one Bidder. The determination of the relationship of Parent(s) and/or Affiliate(s) with the Bidder shall be on the date 7 (seven) days prior to the last date of submission of the Bid. Documentary evidence to establish such relationship shall be furnished by the Bidder along with the Bid.
Sl. No.
Tender Clause
Page No.
Description of clause Modified Clause
2 IB.4.4. (A) General Pre-qualification Criteria of Bidder & FORM-I
7 & 173
3. Experience: The Bidder must have successfully executed & implemented AMR/AMI projects (meeting any of the below criteria) in an Indian/ Global Power Distribution Utility/ Distribution Franchisee in the last 7 years (i.e. FY 2014-15 to till the previous date of publication of this tender). a) Successfully executed AMR/AMI project covering implementation of minimum 50,000 nos. of Meters with required hardware, software and other associated accessories in a single/ multiple contract and project/ projects should have been operational for at least 01 year in last 07 years.
3. Experience: The Bidder must have successfully executed & implemented AMR/AMI projects (meeting any of the below criteria) in an Indian/ Global Power Distribution Utility/ Distribution Franchisee in the last 7 years (i.e. FY 2014-15 to till the previous date of publication of this tender). a) Successfully executed AMR/AMI project covering implementation of minimum 50,000 nos. of Meters with required hardware, software and other associated accessories (Consists of Smart Meters, DCU/Gateway/Router/ GPRS Access Point and HES) in a single/ multiple contract and project/ projects should have been operational for at least 01 year in last 07 years. [In case of Power Distribution Licensee to meet the QR, the licensee can use the credentials of its own or through its majorly owned subsidiary]
3 IB.4.4. (A) General Pre-qualification Criteria of Bidder & FORM-I
7 & 174
6. Evaluation/ Document Required: Authorization letter from OEM for next 7 years back to back support of as per the format attached for Manufacturer’s authorization form (MAF).
6. Evaluation/ Document Required: Authorization letter from OEM for next 10 years back to back support of as per the format attached for Manufacturer’s authorization form (MAF).
Sl. No.
Tender Clause
Page No.
Description of clause Modified Clause
4 IB.4.4. (B) Qualification Requirement for SI & FORM-I
9 & 175
1. Quality Assurance: 1. The SI should be an ISO 41001:2018 certified. 2. SI should have CMMI Level 3 certification. 3. SI should have ISO 27001:2013 or latest certifications. Evaluation/ Document Required: valid ISO and CMMI certificate on or before the date of publication of the tender.
1. Quality Assurance: 1. The SI should be an ISO 41001:2018 certified. 2. SI should have CMMI Level 3 certification. 3. SI should have ISO 27001:2013 or latest certifications. Evaluation/ Document Required: valid ISO and CMMI certificate on or before the Bid Submission Date of the tender.
5 IB.4.4. (B) Qualification Requirement for SI & FORM-I
9 & 175
Integration capability between HES/MDAS with utility systems: System Integrator must have successfully executed AMI projects (Consists of Smart Meters, DCU/Gateway/Router/ GPRS Access Point and HES) with cumulative installation base of Minimum 1.5 lakh end points in the last 5 years till the date of publication of this tender.
Integration capability between HES/MDAS with utility systems: System Integrator must have successfully executed AMI projects (Implemented HES / MDAS system and Integrated with MDM / Utility Billing System ) with cumulative installation base of Minimum 1.5 lakh Smart Meters in the last 5 years till the date of publication of this tender.
6 IB.18.2.1. 15 C. Contents of “Annexure” folder: a. All ANNEXURE I-XV are to be submitted in details (some may be blank, -ANNEXURE XIV) in Annexure folder in their respective format.
C. Contents of “Annexure” folder: a. All ANNEXURE I-XX are to be submitted in details (some may be blank, -ANNEXURE XIV) in Annexure folder in their respective format.
Sl. No.
Tender Clause
Page No.
Description of clause Modified Clause
7 IB.18.2. Part 2:
16 Submission of Sample: The bidder shall submit the sample smart meters along with manufacturer's test result and GTP, on any working day, from 11.00 A.M. to 04.00 P.M. on weeks days within the specified period of submission latest by 04.00 P.M. on the last day of submission of bid to the Office of the Chief Engineer (DTD), Abhikshan, Sec-V, Salt Lake, Kolkata-91. The bidder will be given a receipt, jointly signed by the bidder and DTD officials, mentioning the samples and papers submitted by the bidder as per check list. 1. One no. 1-ph consumer smart meter (whole current) with NIC card from the key manufacturer will be used in this project; 2. One no. 3-ph consumer smart meter (whole current) with NIC card from the key manufacturer will be used in this project; 3. Manufacturer's test result and GTP; 4. BIS certification 5. Three copies of the drawings The bidder should have to present a practical demonstration of their proposed solution in a proto type HES (considering any one of HES solution). Required SIM card should be arranged by bidder itself. The sample meters will then be tested compared to manufacturer's test result and GTP, at DTD laboratory, WBSEDCL. The demonstration should showcase the following test cases: a. Linking of Smart Meter and HES; b. Interoperability of NIC card with al-least 2 leading service provider of India. c. Capture of Instantaneous Parameters of meter; d. Capture of billing data from meter (for consumer meter); e. Capture of Load survey data from meter; f. Remote Connect/Disconnect with relay switch of meters; g. Last Gasp/First Breadth as Alert/Event;
Submission of Sample: The bidder shall submit the sample smart meters along with manufacturer's test result and GTP, on any working day, from 11.00 A.M. to 04.00 P.M. on weeks days within the specified period of submission latest by 04.00 P.M. on the last day of submission of bid to the Office of the Chief Engineer (DTD), Abhikshan, Sec-V, Salt Lake, Kolkata-91. The bidder will be given a receipt, jointly signed by the bidder and DTD officials, mentioning the samples and papers submitted by the bidder as per check list. 1. One no. 1-ph consumer smart meter (5-30 A whole current) with NIC card from each meter manufacturer; 2. Two types of ( 10-60A & 20-100A rated whole current) 3-ph consumer smart meters with NIC card from each meter manufacturer ; 3. Manufacturer's test result and GTP; 4. BIS certification 5. Three copies of the drawings The bidder should have to present a practical demonstration of their proposed solution in a proto type HES (considering any one of HES solution). Required SIM cards should be arranged by bidder itself. The sample meters will then be tested compared to manufacturer's test result and GTP, at DTD laboratory, WBSEDCL. The demonstration should showcase the following test cases: a. Linking of Smart Meter and HES; b. Interoperability of NIC card with al-least 2 leading service provider of India. c. Capture of Instantaneous Parameters of meter; d. Capture of billing data from meter (for consumer meter); e. Capture of Load survey data from meter; f. Remote Connect/Disconnect with relay switch of meters; g. Last Gasp/First Breadth as Alert/Event; h. Sample meter will be tested for accuracy and tamper compared to manufacturer's test result and GTP. The bidder will be declared as qualified to open commercial bid
Sl. No.
Tender Clause
Page No.
Description of clause Modified Clause
The bidder will be declared as qualified to open commercial bid after successful result of their demonstration and meter test results along with other qualifying requirements.
after successful result of their demonstration and meter test results along with other qualifying requirements.
Sl. No.
Tender Clause
Page No.
Description of clause Modified Clause
8 SW.1 Introduction, TS.3.1.1.& ANNEXURE-VII: Data Requirement Sheet (C)
22, 134 &
193
SW.1. Introduction: ..... The communication module for Smart meter should be pluggable NIC card on 4G (fallback to 3G/2G) network based cellular Communication...... TS.3.1.1.: The plug-in type communication WAN module shall be based on Cellular 4G with fallback to 3G/2G capabilities as per Indian telecom Standards. 1. NIC Card: The plug-in type communication WAN module shall be based on Cellular 4G fallback to 3G/2G.
SW.1. Introduction: ..... The communication module for Smart meter should be pluggable NIC card on 4G (fallback to 2G) network based cellular Communication...... TS.3.1.1.: The plug-in type communication WAN module shall be based on Cellular 4G with fallback to 2G capabilities as per Indian telecom Standards. 1. NIC Card: The plug-in type communication WAN module shall be based on Cellular 4G fallback to 2G. NIC card should be on 4G and fall back to 2G.
9 SW.3.3. 23 Plug and play type communication modules shall be deployed in the Smart Meters, these modules shall be field-deployable. The communication infrastructure should be primarily based on 4G (fallback to 3G/ 2G). Communication network shall provide reliable medium for two-way communication between various nodes i.e. Smart meter & HES. SIM cards shall be provided by the bidder from leading service provider in India along with aggregated Bandwidth at Cloud.
Plug and play type communication modules shall be deployed in the Smart Meters, these modules shall be field-deployable. The communication infrastructure should be primarily based on 4G. Communication network shall provide reliable medium for two-way communication between various nodes i.e. Smart meter & HES. SIM cards shall be provided by the bidder from leading service provider in India along with aggregated Bandwidth at Cloud.
10 IB.28 20 Variation during execution: No. of locations as incorporated in this tender are provisional, which may vary up to -10% to +25% (for the first 5 years of the project, from the date of issuance of LOA) of the ordered quantity during course of execution of the contract as per actual requirement and decision by WBSEDCL. WBSEDCL shall communicate such variation of quantity to the vendor in writing. The unit price to be quoted by the bidder and incorporated in the order would remain valid for such variation of quantity.
Variation during execution: No. of locations as incorporated in this tender are provisional, which may vary up to -10% to +10% (for the first 3 years of the project, from the date of issuance of LOA) of the ordered quantity during course of execution of the contract as per actual requirement and decision by WBSEDCL. WBSEDCL shall communicate such variation of quantity to the vendor in writing. The unit price to be quoted by the bidder and incorporated in the order would remain valid for such variation of quantity.
Sl. No.
Tender Clause
Page No.
Description of clause Modified Clause
11 SW.2 23 Smart Meter Count: ....The aforementioned quantity is indicative. Final quantity will be ascertained during issuance of LoA with a variation of -10% to +25% for the first 5 years of the project, from the date of issuance of LOA.
Smart Meter Count: ....The aforementioned quantity is indicative. Final quantity will be ascertained during issuance of LoA with a variation of -10% to +10% for the first 3 years of the project, from the date of issuance of LOA.
12 GCC.1.3 155 The quantities of job mentioned are indicative in nature and may vary -10% to +25% (during first 5 years of the project) as per business requirement. There is no firm commitment from WBSEDCL and it reserves its right to reduce or increase the quantities indicated during the contract period time to time. The successful tenderer shall not be permitted to revise the rates quoted for such increase or decrease in the quantity. WBSEDCL shall not be liable to pay damages/compensation for such increase/decrease. WBSEDCL reserves the right to increase/decrease the work order quantity at the time of confirmation of order.
The quantities of job mentioned are indicative in nature and may vary -10% to +10% (during first 3 years of the project) as per business requirement. There is no firm commitment from WBSEDCL and it reserves its right to reduce or increase the quantities indicated during the contract period time to time. The successful tenderer shall not be permitted to revise the rates quoted for such increase or decrease in the quantity. WBSEDCL shall not be liable to pay damages/compensation for such increase/decrease. WBSEDCL reserves the right to increase/decrease the work order quantity at the time of confirmation of order.
Sl. No.
Tender Clause
Page No.
Description of clause Modified Clause
13 SW.18.2.
30 IA's Responsibilities under Operation & Maintenance Services: The IA shall make available the following man-power resources at the utility’s Network Operations cum Monitoring Centre, a) One resident Project Manager cum Supervisor, b) Two nos Operation Stuffs. c) One support engineer for each category of hardware supplied and d) One software specialists for each domain. Other than that 5 numbers site engineer cum supervisor deployed in each 5 zone offices of WBSEDCL to monitor Site work. The above-mentioned operation and support staff shall be made available for 12 hours a day, if required in two shifts, six days a week barring national holidays.
IA's Responsibilities under Operation & Maintenance Services: The IA shall make available alteast the minimum following man-power resources at the utility’s Network Operations cum Monitoring Centre, a) One Project Manager cum Supervisor, b) Two nos Operation Stuffs. Other than that 5 numbers site engineer cum supervisor deployed in each 5 zone offices of WBSEDCL to monitor Site work. The above-mentioned operation and support staff shall be made available for 12 hours a day, if required in two shifts, six days a week barring national holidays. Also, Bidder need to deploy other resources as per requirement of the project to meet SLA.
14 SW.18.1.6. (ii)
30 ii. Non communicated meter reading with CMRI. Non communicated meter reading with CMRI or any other means with no human intervention like mobile app.
15 SW.25.1. 39 1. Project Manager: She / he shall have the authority to make commitments and decisions that are binding on the IA. The project manager should be an expert in AMI Implementation including metering and related aspects, installation and management of Smart Meters, communication network, last mile connectivity, HES and MDM. The project managers shall be responsible for all communications between other members of the project staffs including sub-contractors, if any.
1. Project Manager: She / he shall have the authority to make commitments and decisions that are binding on the IA. The project manager should be an expert in AMR/ AMI Implementation including metering and related aspects, installation and management of Smart Meters, communication network, last mile connectivity, HES and MDM. The project managers shall be responsible for all communications between other members of the project staffs including sub-contractors, if any.
Sl. No.
Tender Clause
Page No.
Description of clause Modified Clause
16 SW.29. (e) Table Sl. No. 3 Utility detects tampering or theft at site
57 Notify utility personnel for site inspection- Source – MDM Destination – Email/SMS gateway Info exchanged – Consumer number, Meter Number, Tamper code, Address, Lat long
To be deleted.
17 SW.29. (e) Table Sl. No. 3 Utility detects tampering or theft at site
57 Tamper event shared with SAP-ISU. Billing determinants are updated for tamper invoicing Source – MDM Destination – SAP-ISU Info exchanged – Meter no, action (disconnect)
To be deleted.
18 SW.29. (e) Table Sl. No. 3 Utility detects tampering or theft at site
57 Meter re-connection order once tamper issue is resolved- Source – MDM Destination – MDM Info exchanged – Meter no, action (connect)
Meter re-connection order once tamper issue is resolved- Source – MDM Destination – HES Info exchanged – Meter no, action (connect)
19 GCC.1.1. 155 The entire work shall be executed on OPEX MODEL. After successful completion of the project i.e 7 years from the placement of LOA, the whole system including Consumer smart meter, pilfer proof box, communication system, HES, and customized software will be handed over to WBSEDCL without any cost. The vendor also hands over all the operations, relevant documents i.e design documents, source code, integration details, component’s specifications and circuit diagrams etc to WBSEDCL as per exit management plan.
The entire work shall be executed on OPEX MODEL and Implementation Agency will be engaged on DBFOOT (Design Build Finance Own Operate Transfer) basis . After successful completion of the project i.e 10 years from the placement of LOA, the whole system including Consumer smart meter, pilfer proof box, communication system, HES, and customized software will be handed over to WBSEDCL without any cost. The vendor also hands over all the operations, relevant documents i.e design documents, source code, integration details, component’s specifications and circuit diagrams etc to WBSEDCL as per exit management plan.
Sl. No.
Tender Clause
Page No.
Description of clause Modified Clause
20 GCC.1.2 155 Consumer Smart Meters will be supplied on lease rental basis and WBSEDCL have all rights to inspect, seize, test at own and any other third party laboratory at any time. For any adverse or irregularity or malpractice i.r.o smart meters or service connections, WBSEDCL have all the rights to lodge F.I.R or to take necessary legal action as per WBERC regulations.
Consumer Smart Meters will be supplied on DBFOOT (Design Build Finance Own Operate Transfer) basis and WBSEDCL have all rights to inspect, seize, test at own and any other third party laboratory at any time. For any adverse or irregularity or malpractice i.r.o smart meters or service connections, WBSEDCL have all the rights to lodge F.I.R or to take necessary legal action as per WBERC regulations.
21 GCC.1.10. 156 For non-timely completion of the project, WBSEDCL reserves the right to divide/split/modify/cancel the entire job during placement of order without showing any reason whatsoever.
For non-timely completion of the project, WBSEDCL reserves the right to divide/split/modify/cancel the entire job according to 'Termination' Clause of GCC.19.
Sl. No.
Tender Clause
Page No.
Description of clause Modified Clause
22 GCC.9 157 Performance Guarantee: As contract security, the vendor has to furnish a performance Guarantee in the form of Bank Guarantee on non-judicial stamp paper of Rs.100/- by any Schedule Bank in India, as per format enclosed ANNEXURE-XIV. The PBG shall be submitted to the CE, IT&C Cell, 3rd Floor, ‘D’ Block, Vidyut Bhawan, WBSEDCL. For any failure towards satisfactory performance on the part of the Bidder(s), the Bank Guarantee will be liable to encashment and forfeiture. As Performance BG, 0.5 % of Contract Value to be submitted within 45 days from the date of issue of LOA. Validity of PBG will be 7 years from the date of LOA and claim period will be further 6 months.
Performance Guarantee: As contract security, the vendor has to furnish a performance Guarantee in the form of Bank Guarantee on non-judicial stamp paper of Rs.100/- by any Schedule Bank in India, as per format enclosed ANNEXURE-XIV. The PBG shall be submitted to the CE, IT&C Cell, 3rd Floor, ‘D’ Block, Vidyut Bhawan, WBSEDCL. For any failure towards satisfactory performance on the part of the Bidder(s), the Bank Guarantee will be liable to encashment and forfeiture. As Performance BG, 0.5 % of Contract Value to be submitted within 45 days from the date of issue of LOA. Validity of PBG will be 10 years from the date of LOA and claim period will be further 6 months.
Sl. No.
Tender Clause
Page No.
Description of clause Modified Clause
23 GCC.18. 160 GCC.18. Cancellation/Termination of Order: WBSEDCL shall have the right to repudiate the contract if the work is not completed within schedule completion time as per “Time Schedule” and “Completion Time” Clause. WBSEDCL will be at its discretion to take possession of the smart meters installed at consumer premises along with all other equipments and should have the right to invoke and appropriate the entire amount of PBG without citing any cause thereof. The following causes may also lead to cancellation of LOA. GCC.18.1. Non acceptance of LOA as per "Acceptance" clause. GCC.18.2. Non submission of Performance BG within time. GCC.18.3. If the vendor is found to have Conflict of Interest. GCC.18.4. If failed to implement the project. GCC.18.5. If monthly review of performance of the system not upto the performance level. GCC.18.6. If the services rendered by the vendor are failed to meet the bare minimum requirements of WBSEDCL for three consecutive quarters after commencement of work, then Discom will have liberty to terminate the contract. In each above cases 15 days termination notice shall be issued prior to termination of LOA and exit management plan will be followed.
GCC.18. Cancellation of LOA/ Order: The following causes may lead to cancellation of LOA. GCC.18.1. Non acceptance of LOA as per "Acceptance" clause. GCC.18.2. Non submission of Performance BG within time. GCC.18.3. If the vendor is found to have Conflict of Interest.
Sl. No.
Tender Clause
Page No.
Description of clause Modified Clause
24 GCC.19. & GCC.20
160 GCC.19. Premature Termination: GCC.20. Termination for Convenience:
GCC.19: new 'Termination' Clause is annexed herewith. GCC.20.: Consider it deleted.
25 Price Schedule (B)
172 B. Detailed Component wise price: a. Three Phase (3 Ø) Whole Current Smart Meter without Communication Module (Rating 5-30A ) b. Single Phase Smart Meter without Communication Module (5-30A /20-100A))
B. Detailed Component wise price: a. (i) Three Phase (3 Ø) Whole Current Smart Meter without Communication Module (Rating 10-60A ): 85%-90% of total 3 Ø meters: a. (ii) Three Phase (3 Ø) Whole Current Smart Meter without Communication Module (Rating 20-100A ): 10%-15% of total 3 Ø meters: b. Single Phase (1 Ø) Smart Meter without Communication Module (5-30A A):
26 FORM- II (B) Historical Financial Performance
179 Footnote Just Below Table – (a) Must reflect the financial situation of the Bidder or member to a JV, and not sister or parent companies
(a) Must reflect the financial situation of the Bidder or member to a Consortium/JV. In case entity claiming financial capability of its Parent(s) and/ or its Affiliate(s) for the purpose of meeting the qualification requirements; financial situation of its Parent(s) and/ or its Affiliate(s) to be mentioned seperately.
Sl. No.
Tender Clause
Page No.
Description of clause Modified Clause
27 ANNEXURE-XIX: PROFORMA OF IRREVOCABLE STANDBY LETTER OF CREDIT Point 6 (b)
219 6. Terms and Condition Of Standby LC: b. LC will be issued only after completion time of installation phase i.e 2 years of project Line T1 (IB.25.1) and would remain valid upto end of contract period.
6. Terms and Condition Of Standby LC: b. LC will be issued only after completion time of installation phase i.e 1.5 years of project Line T1 (IB.24) and would remain valid upto end of contract period and the LC will be subsequently replenished in case the existing LC claimed by the vendor due to non-payment of bills by WBSEDCL in time.
28 TS.1.6. Constructional Requirement
73 & 74
13. Load Control Switch : Meter shall be remotely settable to support double pole relay for connection/disconnection. 4 No. of poles - Double pole in a single relay 5 Operation of switches - Simultaneous
(Necessary correction to the clause) 13. Load Control Switch : Meter shall be remotely settable to support single pole relay for connection/ disconnection. Single pole Load switch is required for each phase and neutral for 1-phase meters
29 TS.2.6. Constructional Requirement
106 &
107
13. Load Control Switch : Meter shall be remotely settable to support double pole relay for connection/disconnection. 4 No. of poles - Double pole in a single relay 5 Operation of switches - Simultaneous
(Necessary correction to the clause) 13. Load Control Switch : Meter shall be remotely settable to support single pole relay for connection/disconnection. Single pole Load switch is required for each phase and neutral for 1-phase meters
Sl. No.
Tender Clause
Page No.
Description of clause Modified Clause
30 TS.1.6. & TS.2.6 Constructional Requirement:
74 & 107
6. Utilization Categories - UC3 for 5-30A Single Phase meter and 10-60A 3phase meters
(Necessary correction to clauses) 6. Utilization Categories: UC1 or better category but shall be capable of withstanding with operating current range as per IS 16444.
31 TS.1.6. Constructional Requirement:
72 Output Device: a) Meter shall have flashing LED visible from the front to represent energy (active and reactive) recording. Resolution shall be such that satisfactory accuracy test can be conducted at the lowest load in less than 5 minutes and starting current test in less than 10 minutes.
Meter shall have flashing LED visible from the front to represent active energy recording. Resolution shall be such that satisfactory accuracy test can be conducted at the lowest load in less than 5 minutes and starting current test in less than 10 minutes.
32 TS.1.6. & TS.2.6 Constructional Requirement:
73 & 106
9. Battery : Meter shall have Lithium / Lithium ion battery with guaranteed shelf life of 10 years and capacity life of 15 years. In case of battery removal or total discharge same shall not affect the working & memory of the meter even in case of single wire power condition.
9. Battery : Meter shall have Lithium / Lithium ion battery with guaranteed shelf life of 5 years and capacity life of 10 years. In case of battery total discharge, same shall not affect the working & memory of the meter even in case of single wire power condition for the entire project life.
Sl. No.
Tender Clause
Page No.
Description of clause Modified Clause
33 TS.1.10 (4) 82 b) Bidder shall ensure integration of software with any of WBSEDCL system during the life of meter free of cost. WBSEDCL will provide all the required support for integration activity.
Bidder shall ensure integration of software with any of WBSEDCL system during project duration free of cost. WBSEDCL will provide
all the required support for integration activity.
34 TS.1.14.1 & TS.2.14.1.
83 & 117
The test for metrology shall include the “Type Tests, Routine Tests and Acceptance Tests” identified in IS 13779.
The test for metrology will include the “Type Tests, Routine Tests and Acceptance Tests” identified in IS 13779 and IS 16444.
35 TS.1.7. & TS.2.7 Functional Requirement:
76 & 109
15.MD Registration: For Single Phase: Block window with programmable integration period as per requirement. (Default period : 30 min) For three Phase: Block window with 30 min integration period as per requirement. Block window with 15 min (programmable) integration period as per requirement.
Block window with 15 min (programmable) integration period as per requirement.
36 ANNEXURE II 125 &
126
1. PowerRelated Tamper: Power Failure 5. CT Open Tamper 7. Current Unbalance Tamper are required in import Mode Only
1. PowerRelated Tamper: Power Failure 5. CT Open Tamper 7. Current Unbalance Tamper will be applicable in both Import Mode and Import-Export Mode
37 TS.1.5. General Technical Requirement:
69 & 102
33.Alternative data retrieval: In case of meter damage, data stored in meter memory (NVM) shall be retrieved using a jig. Bidder need to provide such jigs free of cost (1 jig on each 10,000 meters). Jig shall be designed such that NVM can be plugged easily on it for data retrieval.
Alternative data retrieval: Requirement of jig is discarded and in special cases of meter damage, data stored in meter memory (NVM) shall be retrieved at OEM's factory.
19
Annexure-B
Detailed description of all new clauses, Forms & Formats:
Page No-160 (New modified Clause)-
GCC.19: Termination:
11.1. IMPLEMENTATION AGENCY (IA) EVENT OFDEFAULT
11.1.1. IA Event of Default means any of the following events arising out of any acts or omission of IA, its
representative, sub-contracts, employees and which have not occurred solely as a result of any
breach of this Contract by the Utility or due to Force Majeure, and where IA has failed to remedy
these events within a period of 90 (ninety) days of issuance of a notice by Utility requiring IA to
remedy such event.
a) IA has failed to procure and arrange requisite finances for the implementation of the Project;
b) IA abandons the implementation of the Project or repudiates this Contract or otherwise takes
any action, or evidences or conveys an intention not to be bound by the Contract;
c) IA,inthejudgmentofWBSEDCLhasengagedincorrupt,fraudulent,collusive,orcoercivepractices, in
competing for or in executing the Contract; or
d) IA is adjudged bankrupt or insolvent, or if a trustee or receiver is appointed for IA or for the
whole or material part of its assets that has a material bearing on its ability to implement the
Project;
e) IA has been, or is in the process of being liquidated, dissolved, wound-up, amalgamated or
reconstituted in a manner that in the reasonable opinion of WBSEDCL would adversely affect
IA’s ability to implement the Project;
f) A resolution for winding up of IA is passed, or any petition for winding up of IA is admitted
byacourtofcompetentjurisdictionandaprovisionalliquidatororreceiverisappointedandsuchorder
has not been set aside within 90 (Ninety) days of the date thereof or IA is ordered to be wound
up by a court of competent jurisdiction;
g) In the event IA fails to cure the default as indicated in the SLA Default Notice within the time
period specified therein;
h) Failure of IA to furnish Performance Security in accordance with the provisions of this Contract;
i) Failure of IA to provide Solution in accordance with Specifications as mentioned in the Scope of
Work, Technical Specification and SLA mentioned in the RFP (bid document);
j) AnyrepresentationorwarrantymadebytheIAduringthetermoftheContractisfoundtobefalse and/or
misleading;
k) Failure on account of IA to abide by Applicable Laws and regulations;
l) The shareholding of the IA ceases to be in accordance with the provisions of this Contract;
m) No person having System Integration (SI) experience in terms of the RFP remains a shareholder
of the IA;
n) In the event equipment installed or proposed to be installed by the IA is found to have any
20
embedded malware/ trojans/ cyberthreat;
o) IA fails to comply with the local content requirement as specified in the Bid Submission;
p) IA fails to comply with any of its material obligations under this Contract.
11.2. UTILITY EVENT OFDEFAULT
11.2.1. Utility Event of Default means any of the following events, unless such event has occurred as a
consequence of the IA Event of Default or a Force Majeure event and where Utility has failed to
remedy these events with in a period of 90 (ninety) days of issuance of a notice by IA requiring
Utility to remedy such event:
a) Failure of Utility to pay the Monthly Payment Bill of IA in accordance with GCC.24. or any other
payment due from Utility under this Contract and more than 90 (ninety) days have elapsed since
such payments became due;
b) Utility is adjudged bankrupt or insolvent, or if a trustee or receiver is appointed for Utility or for
the whole or material part of its assets that has a material bearing on its ability to perform its
obligations under this Contract;
c) Utility has been, or is in the process of being liquidated, dissolved, wound-up, amalgamated or
reconstituted in a manner that in the reasonable opinion of IA would adversely affect Utility’s
ability to perform its obligations under this Contract;
d) A resolution for winding up of Utility is passed, or any petition for winding up of Utility is
admitted by a court of competent jurisdiction and a provisional liquidator or receiver is
appointed and such order has not been set aside within 90(Ninety)days of the date thereof or
Utility is ordered to be wound up by a court of competent jurisdiction;
e) The breach by Utility of its obligations under this Contract which has an adverse effect on the
performance of IA’s obligations under this Contract.
11.3. TERMINATION FOR IMPLEMENTATION AGENCY (IA) EVENT FORDEFAULT
11.3.1. Without prejudice to any other right or remedy which Utility may have in respect thereof under
this Contract, upon the occurrence of IA Event of Default, Utility shall be entitled to terminate this
Contract in the manner provided in Article19.3.2.
11.3.2. Utility shall issue a Preliminary Notice to IA providing 90 (Ninety) Days, or such extended period
as the Utility may allow, to cure the underlying Event of Default. If IA fails to cure the underlying
Event of Default with in such period allowed, Utility shall been titled to terminate this Contract by
issuing a termination notice to IA.
11.4. TERMINATION FOR UTILITY EVENT FORDEFAULT
11.4.1. Without prejudice to any other right or remedy which IA may have in respect thereof under this
Contract, upon the occurrence of a Utility Event of Default, IA shall be entitled to terminate this
Contract in the manner provided in Article19.4.2.
11.4.2. IA shall issue a Preliminary Notice to Utility providing 90 (Ninety) Days, or such extended period
as the IA may allow, to cure the underlying Event of Default. If Utility fails to cure the underlying
Event of Default within such period allowed, IA shall be entitled to terminate this Contract by
21
issuing a termination notice to Utility.
11.5. CONSEQUENCES OFTERMINATION
Upon Termination of the Contract, the IA shall: 11.5.1. Notwithstanding anything to the contrary contained in this Contract, any termination of this
Contract pursuant to its term shall be without prejudice to accrued rights of any Party, including
its right to claim and recover damages and other rights and remedies which it may have in law or
contract. All accrued rights and obligations of any of the Parties under this Contract, shall survive
the termination of this Contract to the extent such survival is necessary for giving effect to such
rights and obligations.
11.5.2. Following issue of the Termination Notice by Utility or IA, Utility take possession and control of
IA’s control centre, installed assets and any other devices necessary to continue the business;
and if any exclusivity granted to IA under this contract will come to an end.
11.5.3. Upon termination of this Contract by WBSEDCL or IA on account of IA’s Event of Default (in
accordance with Article 19.1), or termination of this Contract on account of Utility’s event of
default (inaccordancewithArticle19.2),IAshallbeentitledtoaterminationpaymentsubjecttoproper
transfer of the installed AMI System, as agreed mutually upon, basis the following criteria:
a) In case termination of this Contract on account of IA’s event of default: Termination
payment to IA after Work Completion has been declared shall be 50% of the termination
payment Value as determined in terms of this Contract and WBSEDCL should have the right
to invoke and appropriate the entire amount of PBG without citing any cause thereof.
b) IncaseterminationofthisContractonaccountofUtility’seventofdefault:Terminationpayment to
IA after Work Completion has been declared shall be 100% of the termination payment
Value as determined in terms of this Contract.
c) In case termination of this Contract prior to Work Completion the Termination payment
shall be equal to:
i. 50% of the value of the assets proposed to be handed over to the Utility as certified
by an independent valuer (Preferably Govt. Valuer) & the entire amount of PBG will
be invoked in the event termination is on account of IA event of default– and
ii. 100% of the asset values shall be paid to the IA in the event termination is on
account of Utility event of default
d) IncaseterminationoftheContractpriorto-theWorkCompletion-TheGoodsthatarecompleteand
ready for shipment within 28 (twenty-eight) days after the IA’s receipt of the Notice of
terminationshallbetakenintoaccountwhiledeterminingvalueoftheassetsproposedtobehanded
over to the Utility.
e) In the event of termination prior to Work Completion, Utility may request the IA to complete
any part of the Solution. The cost of such works shall be agreed between the Parties. In the
event PartiesdeemitappropriatethecostmaybedeterminedbytheIndependentValuer
(Preferably Govt. Valuer)
Upon termination of this Contract by WBSEDCL or IA on account of IA’s Event of Default (in
accordance with Article 19.1), or termination of this Contract on account of Utility’s event of
22
default (in accordance with Article 19.2), IA shall be entitled to raise a supplementary invoice for
an amount which is equal to the termination payment. The Supplementary invoice shall be paid
separately by the Utility within 60 (sixty) days from the date of such invoice.
11.5.4. The Termination payment value would be calculated basis the following mechanism:
a) The present value of the receivables for the AMI system installed shall be calculated by
multiplying the outstanding meter-months of operating the AMI system with percentage of
total meters installed, integrated and operationalized as on the date of termination, and
AMI Service Charge, and discounting the same as on date of termination at 12%(“Present
Value”).
b) All amounts due, but not paid by the Utility, including the aggregated IA’s Monthly Bill
Payment, but not paid or recovered from the Utility, for the AMI system operations and
maintenance as defined in the RFP by the IA, shall be calculated and factored in to arrive at
the net outstanding receivables of the IA (“Outstanding Receivables”);
c) All amounts due, but not paid by the IA, including the aggregated applicable liquidated
damages and/(or) penalties due to non-compliance of SLAs by the IA, but not paid or
recovered from the IA, for the Smart Metering system operations and maintenance as
defined in the RFP by the IA, shall be calculated and factored in to arrive at the net
outstanding payables by the IA (“Outstanding Payables”);
d) Termination Payment Value shall be equal to the sum of Net Present Value and Outstanding
Receivables as per Article 19.5.4.(a) and (b); reduced by Outstanding Payables as per Article
19.5.4.(c)andthesumofinsuranceproceedsreceivedbytheIAfortheAMIsystem,(ifany).
11.5.5. Upon Termination of the Contract or expiry of the contract period, the IA shall prepare and
present a detailed Exit Management Plan within 5 (five) working days of termination notice
receipt to the Utility (“Exit Management Plan”) in accordance with GCC.16 to this Contract.
11.5.6. WBSEDCL or its nominated agency will review the Exit Management plan. If approved, IA shall
start working on the same immediately. If the plan is rejected, IA shall prepare alternate plan
within 2( two) working days. If the second plan is also rejected, WBSEDCL will provide a plan
for IA and it should be adhered by in totality.
11.5.7. The Exit Management Plan should cover at least the following:
a) Execute all documents that may be necessary to effectively transfer the ownership and title,
including OEM warranties in respect of all equipment;
b) Handover all developed codes, related documentation and other Configurable Items, if any
in his possession;
c) Handover the list of all IT Assets, passwords at all locations to WBSEDCL. The IA and the Authorized personnel from WBSEDCL will sign a completion certificate at the end of successful completion (all points tracked to closure)of the Exit Management Plan.
23
New Form Under Form-II FORM-II(C)
DETAILS OF PARTICIPATION IN THE Consortium/ JOINT VENTURE
PARTICIPATION DETAILS FIRM ‘A’ (Lead Member)
FIRM ‘B’ FIRM ‘C’
Financial
Name of the Banker(s)
Planning
Supply of information systems Equipment
Software/ development/ /integration/warranty/post warranty services etc.
Key Personnel
Execution of installation of the information systems (Give details on contribution of each member and the controlling member)
The Consortium/ Joint Venture should indicate the details of participation as above.
24
FORM-II(C) Continue… Bidder’s Consortium/JV Members Information Form
[The Bidder shall fill in this Form in accordance with the instructions indicated below. The following table shall be filled in for the Bidder and for each member of a Consortium/ Joint Venture]. Date: [insert date (as day, month and year) of Bid submission] Tender No.: [insert number of Bidding process]
1. Bidder’s Name: [insert Bidder’s legal name]
2. Bidder’s Consortium/ JV Member’s name: [insert JV’s Member legal name]
3. Bidder’s Consortium/ JV Member’s country of registration: [insert JV’s Member country of registration]
4. Bidder’s Consortium/ JV Member’s year of registration: [insert JV’s Member year of registration]
5. Bidder’s Consortium/ JV Member’s legal address in country of registration: [insert JV’s Member legal address in country of registration]
6. Bidder’s Consortium/ JV Member’s authorized representative information
Name: [insert name of Consortium/JV’s Member authorized representative]
Address: [insert address of Consortium/JV’s Member authorized representative]
Telephone/Fax numbers: [insert telephone/fax numbers of Consortium/JV’s Member authorized representative]
Email Address: [insert email address of JV’s Member authorized representative]
7. Attached are copies of original documents of [check the box(es) of the attached original documents]
Articles of Incorporation (or equivalent documents of constitution or association), and/or registration documents of the legal entity named above, in accordance with ITB 3.0
25
FORM-II(D) Subcontractor’s Agreement
Note: This agreement should be written on the letterhead of the Subcontractor and be signed by a person with the proper authority to sign documents that are binding on the Subcontractor.
Request for Bids Title and No.: To: [Purchaser insert: Purchaser’s Officer to receive the Subcontractor’s Agreement] WHEREAS [ insert: Name of Subcontractor ], having head offices at [ insert: address of Subcontractor ], have been informed by [ insert: name of Bidder or Lead Bidder] located at [ insert: address of Bidder or Lead Bidder] (hereinafter, the “Bidder”) that it will submit a bid in which [ insert: Name of Subcontractor ] will provide [ insert: items of supply or services provided by the Subcontractor ]. We hereby commit to provide the above named items, in the instance that the Bidder is awarded the Contract. Name [insert: Name of Officer] in the capacity of [insert: Title of Officer] Signed ______________________________ Duly authorized to sign the authorization for and on behalf of: [insert: Name of Subcontractor] Dated this [ insert: ordinal ] day of [ insert: month ], [ insert: year ]. [add Corporate Seal (where appropriate)]
26
List of Proposed Subcontractors
Item Proposed Subcontractor Place of Registration & Qualifications
27
FORM-II(E)
Summary of Project Experience Declaration
[The following table shall be filled in for the Bidder and for each member of a Consortium/Joint Venture]
Bidder’s Legal Name: ____________________________ Date: _____________________ Consortium/ JV Member Legal Name: ____________________Tender No.: __________________
Sl No
Exp. Against Clause No: Starting
Month / Year
Ending Month /
Year
Document Provided
Contract Identification
Role of Bidder
1. Eg. IB4.3 Table-1 : Sl. No.7 – SI exp.
______
______
(LoA/ Work Order etc)
Contract name: Brief Description of the Information System performed by the Bidder: Name of Purchaser: Address: Contact No; Email:
_________
2. … ______
______
Contract name: Brief Description of the Information System performed by the Bidder: Name of Purchaser: Address:
_________
. … ______
______
Contract name: Brief Description of the Information System performed by the Bidder: Name of Purchaser: Address:
_________
. ______
______
Contract name: Brief Description of the Information System performed by the Bidder: Name of Purchaser: Address:
_________
. ______
______
Contract name: Brief Description of the Information System performed by the Bidder: Name of Purchaser: Address:
_________
n ______
______
Contract name: Brief Description of the Information System performed by the Bidder: Name of Purchaser: Address:
_________
28
FORM-II(F)
Detailed Project Experience as per FORM-II(E)
Description of Each project as declared in Summary Form-II(E): Bidder’s Legal Name: ___________________________ Date: _____________________ Consortium/JV Member Legal Name: _________________________Tender No.: __________________
Detailed project Experience against FORM-II(E) Sl no:
Similar Contract Number: ___ of ___ required.
Information
Contract Identification _______________________________________
Award date
Completion date
_______________________________________
_______________________________________
Role in Contract
Total contract amount In INR: ($ to INR Conversion rate should be rate as on Bid publication date)
If member in a JV or subcontractor, specify participation of total contract amount
__________%
_____________
INR_______
Purchaser’s Name: _______________________________________
Address:
Telephone/fax number:
E-mail:
_______________________________________
_______________________________________
_______________________________________
_______________________________________
29
Project Summary
Amount _________________________________
Physical size _________________________________
Complexity _________________________________
Methods/Technology _________________________________
Key Activities
_________________________________
Reference copy attached (if any)
30
FORM-II(G)
Software List
In accordance with IB.4.4(A) Bidders must submit, as part of their bids, lists of all the Software included in the bid assigned to one of the following categories: (A) System, General-Purpose, or Application Software; or (B) Standard or Custom Software. Bidders must also submit a list of all Custom Materials. These categorizations are needed to support the Intellectual Property in the GCC.
(select one per item) (select one per item)
Software Item
System
Software
General-Purpose Software
Application Software
Standard Software
Custom
Software
32
Annexure -XX :
Manufacture’s Authorization Form (MAF) Date: ______________ Tender Reference No.& Tender ID.______________________________________________
Dear Sir, We _________________________________(OEM) who are established and reputed manufacturers of ________________________________(Equipment) having Factories at ______________________ and _____________________________confirms that , M/s. ______________________________________________(Name and address of Bidder herein after called as partner) wishes to participate the Bid or Project stated above and enter into agreement for the purchase and resale of ___________________________(OEM) Products and, Service. The Partner is entitled and authorized to the following.
(a) Resale, and/or distribute ________________________(OEM) products and/or services in India to end
users within that Territory.
(b) Bid, negotiate and conclude a contract with _____________________________ for the above
products/services manufactured or supplied by ______________________________ (OEM) .
_____________________________(OEM) will, within the scope of its agreement with its authorized channels, provide product warranty services and technical support for ________________________ (OEM) products obtained through its authorized channels for a defect liability period mentioned in the Tender document referred above, from the date of installation at ____________________________________________(Work-site name).
____________________________________(OEM) certify that, the equipment being sold would not be declared End of Sale (EoS) within defect liability period and that _____________________________(OEM) shall supply suitable substitute in case EoS of equipment. Also _________________________(OEM) certifies that the products being sold would be covered under Warranty/Technical Support and technical support will be available for defect liability period from the date of installation at _________________________(Work-site name).
If you need any additional information, please contact Mr./Ms. ______________________ at___________________________ (Mobile No.) of ___________________________(E-mail ID).
Yours faithfully, Name of the person: For and on behalf of M/s. Designation: Contract Details: Date: Place: (Name of Original Equipment Manufacture- OM) (Seal of OEM)
Annexure-C Clarification on important Pre-bid queries:
Sl. No.
Tender Clause
Page No.
Context of the query/ Text Details Query Details/ Clarification
Sought WBSEDCL Response
1 IB.4.3. 6 & 7 The Lead bidder/ Individual Bidder can be any of the three organizations as detailed in table below. In reference to below table, the Lead/ individual bidder should meet its respective QR along with the QR of others (as given below) either as individual, Consortium or sub-contractor. Further, they have to provide clarity on the roles and responsibilities of each consortium member or sub- contractor.
We understand that in case bidder is a Distribution Licensee (DL), then it has to fulfil the QR of DL and MM. So, it is not mandatory to meet the QR of SI as provided under clause IB.4.4.(B). May please confirm.
Yes In that case bidder has to met QR of - (A) General Pre-qualification Criteria of Bidder, (C) Qualification Requirement for DL, (D) Qualification Requirement for MM and also the QR for proposed HES (E) & CSP (F)
Sl. No.
Tender Clause
Page No.
Context of the query/ Text Details Query Details/ Clarification
Sought WBSEDCL Response
2 IB.24. & IB.24.1.
18 & 19
Time Schedule: The basic consideration and the essence of the Contract shall be strict adherence to the time schedule as it will be specified in the contract for supply & services in LOA (Letter of Award) to be issued from WBSEDCL. Total contract period is 10 years from the data of LoA, including 1.5 years of implementation period. After contract awarded to bidder, bidder is expected to complete the implementation of full system on all the envisaged connections of his part within 18 months from the date of award of contract by the WBSEDCL defined by T1 at per time schedule IB.24.1. T1 is divided into 8 quarters (Q1 to Q6) consists of 3 months each. 1st & 2nd quarters Q1 & Q2 (Total 6 months) for project preparation, site inspection, system architecture finalization etc and roll out of AMI should be phase wise and starting from Q3 upto Q6 total 12 months. Count of meter roll out in each phase / quarter will be decided by = (Total no. of meters f awarded to bidder / 4). For example, if L1 bidder is awarded then the total no of smart meters under the scope L1 will be 2,46,733. So, the number of smart meters will fall under each phase/ quarter roll out (from Q3 to Q6) will be: (2,46,733/4) = 61,683. Service period of total AMI system defined by T2 will be 102 months from end of T1. Service will be reviewed monthly. IB.24.1. Time Schedule: Gantt Chart & Complete system is to be established by selected Implementation Agency (IA) within 18 months from the date of award of work and thereafter the same agency to provide support services for 102 months
1. T1 is divided into 6 quarters (Q1 to Q6) not 8 quarters as mentioned. 2. Total meter installation scope per month from Q3 to Q6 is 246733 which comes out as 20561 meters/month (246733/12) which is a huge quantity for implementation, thereby it should be at least 24 months or 8 quarters for implementation only. 3. Please confirm that if T1 gets extended beyond 18 months, for eg T1 = 36 months (and vendor also bears the LD for the same), T2 will still start from the end of T1 i.e. T2 will start after end of 36 months and will continue for 102 months. 4. Early installation of smart meter (pre-schedule of timeline) is allowed or not? EMI payment will be started just after meter got installed or after completion of full implementation period? 5. Gantt Chart is given for the different activities along with timelines. It is understood that this chart is indicative and bidder is
1.Yes, T1 is divided into 6 quarters (Q1 to Q6) not 8 quarters as mentioned. 2. More than one MM can be chosen for that. As the most of the consumers are high valued L&MV Comm. & Ind. consumers meter deployment should not be an issue. 3. In this case T2 time period will be shorter; as project period is fixed and T2 will come to an end on Month no. 120 (LoA Date + 120 month). 4. GCC.25 Sl no. 3 - 1st bill on any smart meter can only be claimed after system Go-live of final acceptance (SW.29) of the system and availability of meter data through remote reading to HES. SW.29 says about Go-live & Final acceptance will be completed just after operational of intial 5000 meters, So monthly bill can be raised from the very next month of whenever meter got installed as per GCC.24.4.2 5. Agreed.
Sl. No.
Tender Clause
Page No.
Context of the query/ Text Details Query Details/ Clarification
Sought WBSEDCL Response
allowed to perform various activities as per work plan finalized. Every IA has different strategy for the implementation as per past experiences of the implementation of the AMI project. However, implementation period will be same i.e. 18 months.
Sl. No.
Tender Clause
Page No.
Context of the query/ Text Details Query Details/ Clarification
Sought WBSEDCL Response
3 SW.3.3. 23 Plug and play type communication modules shall be deployed in the Smart Meters, these modules shall be field-deployable. The communication infrastructure should be primarily based on 4G. Communication network shall provide reliable medium for two-way communication between various nodes i.e. Smart meter & HES. SIM cards shall be provided by the bidder from leading service provider in India along with aggregated Bandwidth at Cloud.
1 NIC card will be based on only 4G or 4G fall back on 2G? 2. Communication Infrastructure should always be 4G fall back to 2G or only 4G is allowed.
NIC card should be as per specification - 'plug-in type communication WAN module shall be based on Cellular 4G fallback to 2G'. But ISP having only 4G services can also be used maintaining the SLA. communication infrastructure should be primarily based on 4G but for any location beyond 4G availability, ISP with 4G fall back to 2G may be used. Multiple ISP vendor is allowed and use of it is solely depends on lead bidder's choice.
4 SW.3.16.1.
24 Consumer Indexing Consumer indexing is separate activity and it is carried out by GIS survey teams to capture all attributes as per GIS system of utility. Hence it is requested to exempt from scope of work of AMI tender.
Consumer to DT mapping and basic installation data capture job and cross verification with GIS data where available.
Sl. No.
Tender Clause
Page No.
Context of the query/ Text Details Query Details/ Clarification
Sought WBSEDCL Response
5 SW. 16.9
28 For new connections service cable till the meter installation point shall be provided by WBSEDCL.
1. In case service cable is required during existing meter replacement, whether the same shall be provided by WBSEDCL. 2. responsibility of installation of service cable also needs to be defined. Further, in case of replacement of meters also, we may require to replace service cable in substantial no. of cases due to various reasons such as joints, damages, falling short with new meter installation etc. Hence it is requested that for all such connections, where service cable is required to be replaced, service cable shall be provided by WBSEDCL and rates should be defined for installation of service cable by the AMI implementation agency, as per the different standard sizes of cables being used in WBSEDCL.
1. Yes, Service cable will be provided by WBSEDCL. 2. Yes, Service cable will be provided and installed by WBSEDCL.
6 SW.29 56 (c) Successfully integration of MDMS with HES, Utility Portal with dashboard & Reporting; Meter installation mobile app with full functionalities;
As per the architecture provided in the RFP document page number 26, we understand that only mobile app for meter installation is in the scope of IA. Development of web portals or consumer portals or any other mobile app is in the scope of MDM provider. Please confirm.
yes, but HES related dashboard and reporting for utility users to be provided.
Sl. No.
Tender Clause
Page No.
Context of the query/ Text Details Query Details/ Clarification
Sought WBSEDCL Response
7 SW. 16.9
28 For new connections service cable till the meter installation point shall be provided by WBSEDCL.
1. In case service cable is required during existing meter replacement, whether the same shall be provided by WBSEDCL. 2. responsibility of installation of service cable also needs to be defined. Further, in case of replacement of meters also, we may require to replace service cable in substantial no. of cases due to various reasons such as joints, damages, falling short with new meter installation etc. Hence it is requested that for all such connections, where service cable is required to be replaced, service cable shall be provided by WBSEDCL and rates should be defined for installation of service cable by the AMI implementation agency, as per the different standard sizes of cables being used in WBSEDCL.
1. Yes, Service cable will be provided by WBSEDCL. 2. Yes, Service cable will be provided and installed by WBSEDCL.
8 Scope of work,
Clarification on complaint management It is understood that all complaint shall be registered at WBSEDCL facilities. Only the complaints related to AMI system up to HES shall be forwarded to Smart Meter IA.
Yes Agreed.
Sl. No.
Tender Clause
Page No.
Context of the query/ Text Details Query Details/ Clarification
Sought WBSEDCL Response
9 Scope of work,
Storage Facility Kindly confirm if WBSEDCL shall provide the storage facility in various circles for storing the meters and meter boxes
No Storage facility will be provided from WBSEDCL side, bidder needs to arrange this on its own.
10 TS.6.1.7.4. Cloud Infrastructure
144 ISO 20000-9-Guidance on the application of ISO/IEC 20000-1 to cloud services
Please clarify submit of ISO 200000-1 certificate would suffice
Yes, submission of ISO 200000-1 certificate would suffice
11 SW.17. 28 Meter Replacement: Trend Report on different aspect like Average burnt meter cases, Average disconnection etc. May be provided for better insight on avg. meter replacement.
Different yearly average parameters related to meter replacement will be published.
12 TS.1.5 & TS.2.5
69 & 103
General Technical Requirement: Point N0. 24. Relative Humidity : 0 to 96%
It should be 0 to 95 % as per IS16444 Part-1
Accepted
13 TS.1.6. Constructional Requirement:
70 & 103
2.Meter Body: a) The meter shall be housed in a safe, high grade, unbreakable, fire resistant, UV stabilized insulating material of good dielectric and mechanical strength, The casing shall be of projection mounting type made up of virgin polycarbonate material.
Flame retardant material should also be acceptable.
Accepted
14 TS.1.6. & TS.2.6 Constructional Requirement:
70 & 103
2. Meter Body: b) The meter cover shall be transparent with viewing window for easy reading of displayed parameters and observation of operation indicators.
The meter cover shall be transparent/ Opaque ? Transparent top cover will be accepted?
Transparent is a desired condition for easy access to inspection. Transparent top cover accepted.
Sl. No.
Tender Clause
Page No.
Context of the query/ Text Details Query Details/ Clarification
Sought WBSEDCL Response
15 TS.1.6. & TS.2.6 Constructional Requirement:
70 & 103
2. Meter Body: d) The meter casing shall not change in shape, colour, size, and dimensions when subjected to UV test as per ASTMD 53 for 200 hrs.
We complies as per ASTM G154 with UV ‘A’ 340 lamp, after this test color change will not exceed (ΔE
<3)
Accepted
16 TS.1.6. & TS.2.6 Constructional Requirement:
71 & 103
2. Meter Body: h)Thickness of meter body (Base and Terminal cover) shall be 2mm minimum
1. Overall thickness of the terminal cover 1.5mm to 2.1 mm. 2. Thickness of meter body (Base and Terminal cover) shall be 2mm minimum.± 0.2 mm approx.
1. Accepted. 2. Accepted
17 TS.1.6. & TS.2.6 Constructional Requirement:
71 & 103
3.Other Constructional Features: b) The terminal block shall be made of high grade non-hygroscopic, fire retardant, fire resistant material having good dielectric and mechanical strength with brass inserts for connecting terminals.
Terminal block is not fire resistant. Accepted.
18 TS.1.6. & TS.2.6 Constructional Requirement:
71 & 103
3. Other Constructional Features: C) The bidder shall submit relevant documents regarding the procurement of polycarbonate material. The polycarbonate material of only the following manufacturers shall be used: i. G.E. Plastics/SABIC LEXAN 943A, or equivalent like 123R for Top cover & Terminal cover/ LEXAN 503R or equivalent like 143R for base & Terminal Block.
1. Top cover & Terminal cover material - PC-143R, Terminal Block - PBT with 30%GF 2. Meter base and cove will be made of LEXAN 943 and terminal block will be made of LEXAN 500R
1. Accepted. 2. Accepted.
19 TS.1.6. & TS.2.6 Constructional Requirement:
71 & 104
3. Other Constructional Features: d) The ETBC shall not be easily detachable from the base and be secured to the base using a hinge or with any other suitable arrangement without hinge.
We will provide the Nylon thread for T-Cover holding.
Accepted.
Sl. No.
Tender Clause
Page No.
Context of the query/ Text Details Query Details/ Clarification
Sought WBSEDCL Response
20 TS.1.6. & TS.2.6 Constructional Requirement:
71 & 104
3. Other Constructional features: e) ETBC shall be closed at the bottom to prevent access for wires to terminal holes.
These two clauses are contradictory. Please clarify the requirement
Provision for wire entry at the bottom may be provided. 21 TS.1.6.
& TS.2.6 Constructional Requirement:
71 & 104
f) The terminal cover shall have provision for cable entry from the bottom.
22 TS.1.6. & TS.2.6 Constructional Requirement:
72 & 104
3. Other Constructional Features: e) ETBC shall be closed at the bottom to prevent access for wires to terminal holes. f) The terminal cover shall have provision for cable entry from the bottom. g) The terminal cover shall have sufficient space for incoming and outgoing cable such that these can pass without stressing and damaging the terminal cover.
We will provide wire entry cut in the bottom. Or meter terminal cover have single U cut for cable entry from bottom.
Accepted.
Sl. No.
Tender Clause
Page No.
Context of the query/ Text Details Query Details/ Clarification
Sought WBSEDCL Response
23 TS.1.6. & TS.2.6 Constructional Requirement:
72 & 105
5. Sealing Arrangement: a) The sealing screws used for the meter cover shall be fixed upside down so that these are tightened from the rear and for screw less design also for fixing the base and cover provision for sealing must be there. b) A run through screw (stud) has to be provided from bottom side & sealing is to be done on the top side of the meter.
1. Kindly allow top side up fixing screw. If require, WBSEDCL may ask for unidirectional screw. 2. The sealing screws used for the meter cover will be unidirectional and will be tightened from front. Same should be acceptable. 3. The sealing screws used for the meter cover will be fixed from the top to the bottom side so that these are tightened from the front.
1. Unidirectional screw is acceptable. 2. Solution 2. is also accepted. 3. Solution 3. is also accepted.
24 TS.1.6. & TS.2.6 Constructional Requirement:
73 & 106
9. Battery : Meter shall have Lithium / Lithium ion battery with guaranteed shelf life of 5 years and capacity life of 10 years. In case of battery removal or total discharge same shall not affect the working & memory of the meter even in case of single wire power condition.
Battery is the integral part of the meter. Kindly elaborate how a break to open type meter's battery can be removed. Even if someone break the meter to remove the meter, same will be notified to HES in case of smart metering. Meter will run accurately (+/- 4% ) under single wire condition and a separate battery for the same is provided. Kindly amend the clause as " In case of battery total discharge, same shall not affect the working & memory of the meter even in case of single wire power condition for the entire project life"
In case of battery total discharge, same shall not affect the working & memory of the meter even in case of single wire power condition for the entire project life"
Sl. No.
Tender Clause
Page No.
Context of the query/ Text Details Query Details/ Clarification
Sought WBSEDCL Response
25 TS.1.6. & TS.2.6 Constructional Requirement:
73 & 106
11. Meter reading in Power Off condition: It shall be possible to read the meter during power off condition. It shall also be possible to read the meter through NIC or with CMRI / Laptop in this condition. If battery is used for the same, it shall have to be a separate battery and not the one used for RTC, i.e., the RTC battery and the battery used for display during power off condition shall not be the same.
It will be possible to read the meter during power off condition. The meter can read only through optical port by CMRI / Laptop.
Accepted.
26 TS.1.6. & TS.2.6 Constructional Requirement:
74 & 107
13.Load Control Switch: c) Pre-programmed Tamper conditions (like, Meter Cover open detection, Neutral disturbance, Magnetic Interference and single wire etc.).
Switch open in case of ND is not recommendable by many utilities so this feature shall not be available.
Neutral disturbance tamper recording will happen but no load switch operation is required
27 TS.1.6 (25) & TS.2.6
77 & 113
**Disconnection Logic must be programmable at the time of installation
Disconnection logic shall be provided by utility and same shall be configurable at factory end only. Disconnection logic related to end consumer like over load, over current etc. can be configured in field through either token or over the air.
Accepted
28 TS.1.6 (26)& TS.2.6
78 & 113
**Re-connection Logic must be programmable at the time of installation
Reconnection logic shall be provided by utility and same shall be configurable at factory end only. Reconnection logic related to end consumer like over load, over current etc. can be configured in field through either token or over the air.
Accepted
Sl. No.
Tender Clause
Page No.
Context of the query/ Text Details Query Details/ Clarification
Sought WBSEDCL Response
29 TS.1.8. & TS.2.8 Anti-tamper and Fraud Detection Requirement
79 & 114
6. & 5. Protection against HV spark: In case a spark of up to 35 kV is applied externally to the meter including its communication port with its cover in place, using a spark gun / ignition coil, meter shall either remain immune & continue to record energy with allowable accuracy or log the event.
Meter will be immune as per CBIP-325
If it is immune as per CBIP-325 then it ok. Other wise follow tech spec.
30 TS.2.8. Anti-tamper and Fraud Detection Requirement
114 8. External Magnetic Interference - For External Magnetic Interference meter is complying with IS16444 and IS13779.
Accepted
31 TS.1.8. Anti-tamper and Fraud Detection Requirement
79 8. Neutral disturbance: Meter shall log all events when AC/DC Pulsating Voltage is injected in neutral circuit especially when it can affect the recording of energy.
Load switch of the meter shall disconnect the load to avoid power consumption under this condition
Accepted.
32 TS.1.8. Anti-tamper and Fraud Detectio
79 14. I/C & O/G Interchanged Meter shall log all events when AC/DC Pulsating Voltage is injected in neutral circuit especially when it can affect the recording of energy.
Load switch of the meter will disconnect the load to avoid load drawing under this condition. Please accept
Accepted.
Sl. No.
Tender Clause
Page No.
Context of the query/ Text Details Query Details/ Clarification
Sought WBSEDCL Response
n Requirement
33 TS.1.8. Anti-tamper and Fraud Detection Requirement
79 10. Single wire power Meter shall be immune (error within +4%) and shall start energy recording for connected load above 0.5 A
Switch disconnection should be allowed as well to avoid tampering.
Accepted.
34 TS.1.8. & TS.2.8 Anti-tamper and Fraud Detection Requirement
80 & 115
22.Tamper Indication Appropriate Indications/Icons for all tampers shall appear on the meter display either continuously or in auto display mode.
Suitable tamper indication with appropriate indication/ icon along with suitable abbreviation shall be provided on meter display
Accepted.
35 TS.1.8. & TS.2.8 Anti-tamper and Fraud Detection Requirement
79 & 115
24. High Frequency Jammer: Meter shall have to be immune on this test.
Meter will be immune as per CBIP-325
Accepted.
Sl. No.
Tender Clause
Page No.
Context of the query/ Text Details Query Details/ Clarification
Sought WBSEDCL Response
36 TS.1.9 (2)
80 Viewing angle a) Display shall have 35 degree up & down viewing angle from eye level.
Display will have 60 degree up & down viewing angle from eye level.
Accepted.
37 TS.1.9 (3)
81 Display of Meter Serial No- Every meter shall have a unique alpha-numeric serial no. for displaying either in 9 complete places or in billboard fashion in “Separate Scrolling Mode”.
Every meter will have a unique alpha-numeric serial no. for displaying either in 10 complete places or in billboard fashion in “Separate Scrolling Mode”.
Accepted.
38 TS.1.11. Marking of Meter:
83 (r) Communication technology for WAN or NAN (with carrier frequency)
Communication technology for WAN or NAN (with carrier frequency) will be provided in the Communication Module.
Accepted.
39 GTP 88 37. e) Temperature - + 70c
We shall provide as per specification clause no. TS.1.9. Meter Display
Accepted
40 GTP 88 36. Provision for connectivity ( RS 232) Meter have optical port along with communication module hence requirement of RS232 should be remove from the requirement.
Accepted
41 ANNEXURE-II
89 3. Neutral Disturbance: Import & Export
In case of import export metering mode, energy measurement will be in import mode only.
Accepted
42 ANNEXURE-II
90 4. Magnetic Tamper. Occurrence - 1 Min. Import & Export
In case of import export metering mode, energy measurement will be in import mode only. Magnetic tamper occurrence shall be within 10 sec
Accepted
Sl. No.
Tender Clause
Page No.
Context of the query/ Text Details Query Details/ Clarification
Sought WBSEDCL Response
43 ANNEXURE-II
90 6. Cover Open: Occurrence threshold - On Removal of Meter Cover the Meter will lock Cover Open Event with Date and Time Stamp, It must be reflected in Auto Display mode. Occurrence time - Immediate Restoration Threshold - No restoration shall be allowed without due authorization Restoration Time - Immediate
6. Cover Open: Occurrence threshold- On Removal of Meter Cover the Meter will log Cover Open Event with Date and Time Stamp, cover open tamper show permanently in auto mode, auto mode display will be blocked. Occurrence time - Immediate Restoration Threshold - No restoration shall be allowed without due authorization Restoration Time - Immediate
Accepted
44 2. TECHNICAL REQUIREMENT:
91 & 127
The Meter Box shall have top tapered surface and round corners to prevent any water logging on the top of meter cover. The overall dimensions of the enclosure shall be suitable for housing the single phase smart meter along with all its attachments/accessories as offered by the bidder and there shall be a clearance of 30 + 2 mm from top & both sides of the meter. Bottom side clearance shall be 75 + 5 mm from the lower edge of terminal block of the meter. Clearance from front side and back side of the meter shall be 15 + 2 mm and 10 + 2 mm respectively.
1. Clearance as Below Left, Right & Top Side :- 30mm Bottom:-75mm Front side:- 25mm Back Side :- 10mm 2. Please also accept the clearance between top and both side with minimum 30mm, bottom side with minimum 75mm from the lower edge of the terminal block of the meter , front side of the meter minimum 15mm and back side of the meter minimum 10mm.
1. Accepted 2. Accepted
Sl. No.
Tender Clause
Page No.
Context of the query/ Text Details Query Details/ Clarification
Sought WBSEDCL Response
45 3. CONSTRUCTION
91 & 128
3.3 Hinge: A minimum of 2 nos. brass/stainless steel hinges in left side of the door and 1 no. brass/stainless steel hinge/stainless steel U type latch with locking arrangement in right side of the door shall be provided inside the enclosure. The hinges of the door shall be concealed and they shall be fixed to the flanges provided on the body and cover of the enclosure in such a manner that the door opens by a minimum of 120 degrees.
1. 2 Nos. hinge pin LHS & 2 Nos. GI U type latch RHS with locking/Sealing arrangement. 2. Please also accept 2 nos. hinges in right side of the door and U type latch with locking arrangement in left side of the door. All other Indian utilities are also accept the same, So kindly delete the above requirement.
1. Accepted 2. Accepted
46 3. CONSTRUCTION
91 Suitable grove with locking arrangement shall be provided for opening of the enclosure door.
We are providing extra step for door opening.
Accepted
47 3. CONSTRUCTION
91 3.8 Incoming and outgoing cable arrangement: Required number of holes at bottom with suitable diameter shall be provided in the box for cable/wire entry. The holes must be totally covered with neoprene rubber gasket (NRG). NRG will be punched for entry of incoming and outgoing cable/wire.
Grommet Will Provide for 30A. Accepted
48 3. CONSTRUCTION
91 & 128
3.9 Base and Cover details: Thickness of the meter box shall not be less than 2.0 mm on all sides including door. The meter box shall have 4 mm thickness of the tongue and groove area. The meter box cover shall be made overlapping type having collars on all four (4) sides and shall be provided with Neoprene rubber gasket of minimum 2.5 mm dia to completely fit in the grooves of the base....
We are providing top cover overlapping 10mm. The meter box cover will be overlapping type having collars on all four (4) sides and will be provided with EPDM rubber gasket
Accepted
49 3. CONSTRUCTION
91 3.12 The Enclosures shall be of crystal clear (transparent) polycarbonate
Clear Transparent polycarbonate. Accepted
Sl. No.
Tender Clause
Page No.
Context of the query/ Text Details Query Details/ Clarification
Sought WBSEDCL Response
50 3. CONSTRUCTION:
92 3.13 Marking/Embossing: c) & g) Meter Box Sl. No. (Embossed / laser printing on both the base and covers of Meter Box)
We request that, with Embossed/ Laser printing please also accept printing of Meter Sl. No. on both the base and covers of Meter Box. Please confirm the acceptability of the same.
Accepted
51 Annexure IV & Annexure V
94 & 95
10. Test Requirement: Test for resistance to heat & fire (Glow wire test at 6500 C) (d)Resistance to heat & fire: Glow wire test at 6500 C
Glow wire test at 6500 C should be read as 650 Deg C
Accepted it should be 650°C [ Deg C ]
52 ANNEXURE – IV (11)
94 & 130
Heat deflection temp. @1.8 MPa-1000 C (Minm. for Engg. Plastic)/1400 C (Minim. For Polycarbonate Routine Test(R)
Meter is complying with HDT up to 120 degree however it is not covered in routine test. Kindly accept the same.
Accepted
53 ANNEXURE – IV (12)
94 Self Extinguishing property of spirit burner test. Routine Test(R)
Meter is complying Self Extinguishing property of spirit burner test however it is not covered in routine test. Kindly accept the same.
Accepted
54 ANNEXURE – IV (13) & Annexure-IV (11)
94 & 130
Melting point-1800 C (Minimum for Engg. Plastic)/2100 C (Minimum for Polycarbonate)
Melting point-180° C (Minimum for Engg. Plastic)/ 210° C(Minimum for Polycarbonate)
55 ANNEXURE – V (i)
96 i) No. of holes for fixing of meter box: 4 Nos. Holes ii) Dimension of holes 6 mm
i) No. of holes for fixing of meter box: 3 Nos. Holes ii) Dimension of holes 4 mm
Accepted
Sl. No.
Tender Clause
Page No.
Context of the query/ Text Details Query Details/ Clarification
Sought WBSEDCL Response
56 TS.2.8. Anti-tamper and Fraud Detection Requirement
114 3. Power On/ Off- Meter shall log Power Off event occurrence if the phase voltage is absent beyond a threshold period.
Meter will log Power Off event occurrence if all three voltage are absent beyond a threshold period. Same should be acceptable.
Accepted
57 GCC.14.3.
158 The warranty of the complete system shall remain valid till expiry of the Contract Period.
Kindly confirm the warrantee period for the Smart Meters which needs to be mentioned on the name plate.
Valid upto 'LoA Date + 10 years'
58 TS.2.6.3 Other Constuctional Features
106 m) The meter should be fitted with SHUNT for measuring current in the phase element. The Neutral element may have either C.T. or SHUNT or HALL EFFECT SENSOR with proper isolation.
The meter should be fitted with CT for measuring current in the phase elements.
Accepted
59 TS.2.6 Point 13
107
Load Control Switch: The phase and neutral relay shall connect/disconnect on the following conditions: a) Over current b) Load control limit Pre-programmed Tamper conditions (like, Meter Cover Open detection, Neutral Disturbance, Magnetic Interference etc.).
In samples meters the meter shall be programmed to disconnect relay under said tampers conditions as per clause no (C) or Tamper logic table as mentioned in the specifications shall be followed.
Accepted
60 ANNEXURE II
126 Sl. No: 10 Magnet Tamper
Magnet Tamper -If meter get affected to the applied magnetic filed then meter relay will disconnect / As per CBIP 325.
Accepted
Sl. No.
Tender Clause
Page No.
Context of the query/ Text Details Query Details/ Clarification
Sought WBSEDCL Response
61 ANNEXURE II
126 11.Cover Open. Occurrence threshold - On Removal of Meter Cover the Meter will lock Cover Open Event with Date and Time Stamp, It must be reflected in Auto Display mode. Occurrence time - Immediate Restoration Threshold - No restoration shall be allowed without due authorization Restoration Time - Immediate
Occurrence threshold - On Removal of Meter Cover the Meter will log Cover Open Event with Date and Time Stamp, cover open tamper show permanently in auto mode, auto mode display will be block. Occurrence time - Immediate Restoration Threshold - Not restoration. Restoration Time - No
Accepted
62 TS.2.8. Anti-tamper and Fraud Detection Requirement
114 7. Neutral disturbance: Meter shall log all events when AC/DC Pulsating Voltage is injected in neutral circuit especially when it can affect the recording of energy.
In case any spurious signal Injected to the neutral of Meter then, If meter get affected, the recording of the meter, meter relay will disconnect after log the tamper / Meter will record energy as per default parameters (Vref, actual current,UPF). Occurrence time - Within 30 sec Restoration Time - Within 30 sec Energy recording in import mode only.
Accepted
63 ANNEXURE II Sl. No:9
126 9. Neutral disturbance In case any spurious signal Injected to the neutral of Meter, offered meter will be either immune or gets affected it will log the neutral disturbance event with date and time. Meter will register energy at reference voltage , actual current and UPF. Occurrence time - Within 20-40 s Mode - Import & Export
Accepted
Sl. No.
Tender Clause
Page No.
Context of the query/ Text Details Query Details/ Clarification
Sought WBSEDCL Response
64 ANNEXURE II Sl. No:1
125 1. Power Related Tamper: Power Failure Occurrence Threshold i) All Phase Voltages ? 30% of Vref. ii) I3x> 5% of Ib
Power failure will occur in case of absence of Voltage in all 3 phases i.e. All phases Voltage = 0 Volt
Accepted
65 3.0 CONSTRUCTION:
91 & 128
3.5 Fixing arrangement: The meter box shall have sufficient number of mounting brackets made out of same material as of meter box with provision for hole of suitable diameter for mounting the box on the wall or on wooden board with suitable screws.
1. Box have 2key hole &2circular holes for Mounting instead of mounting bracket 2. Meter Box will be provided with 2 nos circular holes and 2 nos key holes which is sufficient to mount the box on the wall or on wooden board; Mounting bracket will be additional component and does not provide any value-add but only increases the cost of Meter Box.
1. Accepted 2. Accepted
66 3.0 CONSTRUCTION:
128 3.8 Incoming and outgoing cable arrangement: Required number of holes at bottom with suitable diameter shall be provided in the box for cable/wire entry. The holes must be totally covered with neoprene rubber gasket (NRG).
Incoming and outgoing cable arrangement: 02 number of holes at bottom with suitable diameter will be provided in the box for cable/wire entry. The holes covered with Plastic clands instead of rubber gasket
Accepted
67 3.0 CONSTRUCTION:
129 One push button is to be provided on the front side of the top cover of meter box for taking meter reading during power off condition without opening of meter box cover.
2 Nos push button provided on Box top cover for taking meter reading
Accepted
68 193 It shall support 3/ 1.8V SIM interface and shall accepts standard SIM card/ Micro
It shall support 3/ 1.8V SIM interface and shall accepts standard SIM card/ Micro/Nano
Accepted
Annexure-D Reports: ** All reports are indicative
Report on different Meter Replacement Issues
Particulars
Report for FY 2020-21
For All L&MV GOVT CONSUMER
CONSIDERING LOAD 5 TO 50 KVA
For COMMERCIAL CONSUMER For INDUSTRIAL CONSUMER
Consumer Count 66355 86384 93994
Burnt Meter Case 108 572 974
Burnt Meter % 0.16% 0.66% 1.04%
Permanent/ Deemed Disconnection 650 5784 2616
Permanent/ Deemed Disconnection % 0.98% 6.70% 2.78%
TOWN WISE CONSUMER BREAKUP
Zone Name Region Name Division Name Supply Office Name COMME
RCIAL GOVT. INDUS TRIAL
Grand Total
KOLKATA ZONE SOUTH 24 PGS REGION BEHALA BUDGE BUDGE CCC 111 36 142 289
KOLKATA ZONE SOUTH 24 PGS REGION BEHALA AMTALA CCC 272 29 172 473
KOLKATA ZONE SOUTH 24 PGS REGION BEHALA NODAKHALI CCC 71 36 100 207
KOLKATA ZONE SOUTH 24 PGS REGION BEHALA BAKRAHAT CCC 213 25 298 536
KOLKATA ZONE SOUTH 24 PGS REGION BEHALA PAILAN CCC 282 22 155 459
KOLKATA ZONE SOUTH 24 PGS REGION BEHALA USTHI CCC 166 143 297 606
KOLKATA ZONE SOUTH 24 PGS REGION BARUIPUR CHAMPAHATI CCC 73 43 123 239
KOLKATA ZONE SOUTH 24 PGS REGION BARUIPUR MATHURAPUR CCC 168 97 335 600
KOLKATA ZONE SOUTH 24 PGS REGION BARUIPUR MAGRAHAT CCC 82 27 174 283
KOLKATA ZONE SOUTH 24 PGS REGION BARUIPUR LAXMIKANTAPUR CCC 68 58 95 221
KOLKATA ZONE SOUTH 24 PGS REGION BARUIPUR BARUIPUR CCC 249 133 134 516
KOLKATA ZONE SOUTH 24 PGS REGION BARUIPUR RAMNAGAR CCC 115 35 131 281
KOLKATA ZONE SOUTH 24 PGS REGION BARUIPUR MAHINAGAR CCC 275 54 93 422
KOLKATA ZONE SOUTH 24 PGS REGION BARUIPUR JOYNAGAR CCC 95 91 125 311
KOLKATA ZONE SOUTH 24 PGS REGION BARUIPUR DAKSHIN BARASAT CCC 99 25 159 283
KOLKATA ZONE SOUTH 24 PGS REGION BARUIPUR KULTALI CCC 90 12 144 246
KOLKATA ZONE SOUTH 24 PGS REGION GARIA BANSDRONI CCC 161 176 159 496
KOLKATA ZONE SOUTH 24 PGS REGION GARIA GARIA CCC 540 258 208 1006
KOLKATA ZONE SOUTH 24 PGS REGION GARIA RAJPUR CCC 269 24 215 508
KOLKATA ZONE SOUTH 24 PGS REGION GARIA SONARPUR CCC 244 37 87 368
TOWN WISE CONSUMER BREAKUP
Zone Name Region Name Division Name Supply Office Name COMME
RCIAL GOVT. INDUS TRIAL
Grand Total
KOLKATA ZONE SOUTH 24 PGS REGION GARIA BOALIA CCC 155 44 89 288
KOLKATA ZONE SOUTH 24 PGS REGION GARIA BORAL CCC 142 18 454 614
KOLKATA ZONE SOUTH 24 PGS REGION DIAMOND HARBOUR DIAMOND HARBOUR CCC 202 180 103 485
KOLKATA ZONE SOUTH 24 PGS REGION DIAMOND HARBOUR SARISHA CCC 143 38 227 408
KOLKATA ZONE SOUTH 24 PGS REGION DIAMOND HARBOUR FALTA CCC 149 44 228 421
KOLKATA ZONE SOUTH 24 PGS REGION DIAMOND HARBOUR KULPI CCC 128 77 167 372
KOLKATA ZONE SOUTH 24 PGS REGION DIAMOND HARBOUR FALTA SEZ CCC 48 41 24 113
KOLKATA ZONE SOUTH 24 PGS REGION KAKDWIP KAKDWIP CCC 229 215 249 693
KOLKATA ZONE SOUTH 24 PGS REGION KAKDWIP NAMKHANA CCC 131 77 126 334
KOLKATA ZONE SOUTH 24 PGS REGION KAKDWIP RUDRANAGAR CCC 111 147 150 408
KOLKATA ZONE SOUTH 24 PGS REGION KAKDWIP PATHAR PRATIMA CCC 126 33 155 314
KOLKATA ZONE SOUTH 24 PGS REGION CANNING(D)DIV. CANNING CCC 207 119 150 476
KOLKATA ZONE SOUTH 24 PGS REGION CANNING(D)DIV. BASANTI CCC 167 62 82 311
KOLKATA ZONE SOUTH 24 PGS REGION CANNING(D)DIV. JIBANTALA CCC 115 105 111 331
KOLKATA ZONE SOUTH 24 PGS REGION CANNING(D)DIV. GOSABA CCC 110 35 14 159
KOLKATA ZONE BIDHANNAGAR REGION BIDHANNAGAR-I BIDHANNAGAR CCC-I 1265 159 7 1431
KOLKATA ZONE BIDHANNAGAR REGION BIDHANNAGAR-I BIDHANNAGAR CCC-II 1194 577 25 1796
KOLKATA ZONE BIDHANNAGAR REGION BIDHANNAGAR-I BIDHANNAGAR CCC-III 717 220 20 957
KOLKATA ZONE BIDHANNAGAR REGION BIDHANNAGAR-II NEW BARRACKPUR CCC 111 60 72 243
KOLKATA ZONE BIDHANNAGAR REGION BIDHANNAGAR-II BIRATI CCC 160 78 56 294
KOLKATA ZONE BIDHANNAGAR REGION BIDHANNAGAR-II BAGUIHATI CCC 408 52 111 571
KOLKATA ZONE BIDHANNAGAR REGION BIDHANNAGAR-II RAJARHAT CCC 753 107 287 1147
KOLKATA ZONE BIDHANNAGAR REGION BIDHANNAGAR-II LAUHATI CCC 315 106 421
KOLKATA ZONE BIDHANNAGAR REGION BIDHANNAGAR-II KRISHNAPUR CCC 549 58 40 647
KOLKATA ZONE BIDHANNAGAR REGION BIDHANNAGAR-II TEGHORIA CCC 721 42 36 799
KOLKATA ZONE BIDHANNAGAR REGION BHANGAR KOLKATA LEATHER COMPLEX CCC 181 17 309 507
KOLKATA ZONE BIDHANNAGAR REGION BHANGAR BHANGAR CCC 257 41 374 672
KOLKATA ZONE BIDHANNAGAR REGION BHANGAR MINAKHAN CCC 92 37 59 188
KOLKATA ZONE BIDHANNAGAR REGION BHANGAR SARBERIA CCC 61 24 34 119
TOWN WISE CONSUMER BREAKUP
Zone Name Region Name Division Name Supply Office Name COMME
RCIAL GOVT. INDUS TRIAL
Grand Total
KOLKATA ZONE BIDHANNAGAR REGION NEW-TOWN NEWTOWN ACTION AREA I 1063 6 1069
KOLKATA ZONE BIDHANNAGAR REGION NEW-TOWN NEWTOWN ACTION AREA II 486 1 487
KOLKATA ZONE BIDHANNAGAR REGION NEW-TOWN NEWTOWN ACTION AREA III 147 147
KOLKATA ZONE HOWRAH REGION HOWRAH-I ANDUL-MOURI CCC 292 46 259 597
KOLKATA ZONE HOWRAH REGION HOWRAH-I JALDHULAGORI CCC 462 20 342 824
KOLKATA ZONE HOWRAH REGION HOWRAH-I BHATTANAGAR CCC 62 30 415 507
KOLKATA ZONE HOWRAH REGION HOWRAH-I SANTRAGACHI CCC 104 102 330 536
KOLKATA ZONE HOWRAH REGION HOWRAH-I BALLY CCC 193 93 266 552
KOLKATA ZONE HOWRAH REGION HOWRAH-I JAGADISHPUR CCC 137 37 824 998
KOLKATA ZONE HOWRAH REGION HOWRAH-I DASNAGAR CCC 150 160 3498 3808
KOLKATA ZONE HOWRAH REGION ULUBERIA ULUBERIA CCC 183 48 110 341
KOLKATA ZONE HOWRAH REGION ULUBERIA BURIKHALI CCC 155 15 145 315
KOLKATA ZONE HOWRAH REGION ULUBERIA BIRSHIBPUR CCC 140 42 270 452
KOLKATA ZONE HOWRAH REGION ULUBERIA BAGNAN-I CCC 219 95 133 447
KOLKATA ZONE HOWRAH REGION ULUBERIA BAGNAN-II CCC 98 85 193 376
KOLKATA ZONE HOWRAH REGION ULUBERIA AJODHYA CCC 111 51 170 332
KOLKATA ZONE HOWRAH REGION ULUBERIA DEULGRAM CCC 89 27 153 269
KOLKATA ZONE HOWRAH REGION ULUBERIA SHYAMPUR CCC 149 22 288 459
KOLKATA ZONE HOWRAH REGION ULUBERIA PANCHLA CCC 343 76 217 636
KOLKATA ZONE HOWRAH REGION ULUBERIA GARCHUMUK CCC 79 27 168 274
KOLKATA ZONE HOWRAH REGION ULUBERIA MANSHATALA CCC 133 33 105 271
KOLKATA ZONE HOWRAH REGION HOWRAH-II SALAP CCC 420 39 1015 1474
KOLKATA ZONE HOWRAH REGION HOWRAH-II BARGACHIA CCC 64 47 445 556
KOLKATA ZONE HOWRAH REGION HOWRAH-II DOMJUR CCC 561 62 440 1063
KOLKATA ZONE HOWRAH REGION HOWRAH-II MUNSHIRHAT CCC 138 117 169 424
KOLKATA ZONE HOWRAH REGION HOWRAH-II AMTA CCC 140 102 205 447
KOLKATA ZONE HOWRAH REGION HOWRAH-II AMRAGORAI CCC 83 142 191 416
KOLKATA ZONE HOWRAH REGION HOWRAH-II UDAYNARAYANPUR CCC 95 158 189 442
KOLKATA ZONE NORTH 24 PGS REGION BARACKPUR RAHARA CCC 210 272 206 688
TOWN WISE CONSUMER BREAKUP
Zone Name Region Name Division Name Supply Office Name COMME
RCIAL GOVT. INDUS TRIAL
Grand Total
KOLKATA ZONE NORTH 24 PGS REGION BARACKPUR SODEPUR CCC 207 236 106 549
KOLKATA ZONE NORTH 24 PGS REGION BARACKPUR PANSILA CCC 76 185 68 329
KOLKATA ZONE NORTH 24 PGS REGION BARACKPUR AGARPARA CCC 46 134 34 214
KOLKATA ZONE NORTH 24 PGS REGION BARACKPUR MURAGACHA CCC 137 42 423 602
KOLKATA ZONE NORTH 24 PGS REGION BARACKPUR ANANDAPURI SECTOR CCC(SAP) 106 154 23 283
KOLKATA ZONE NORTH 24 PGS REGION BARACKPUR JAFARPUR CCC 265 124 117 506
KOLKATA ZONE NORTH 24 PGS REGION BARACKPUR TALPUKUR CCC 69 134 79 282
KOLKATA ZONE NORTH 24 PGS REGION BARACKPUR ARABINDA NAGAR CCC 66 169 121 356
KOLKATA ZONE NORTH 24 PGS REGION BARACKPUR BARRACKPORE CCC 316 257 67 640
KOLKATA ZONE NORTH 24 PGS REGION BARASAT BERACHAMPA CCC 133 35 211 379
KOLKATA ZONE NORTH 24 PGS REGION BARASAT GANGANAGAR CCC 404 73 446 923
KOLKATA ZONE NORTH 24 PGS REGION BARASAT JEERAT CCC 155 43 311 509
KOLKATA ZONE NORTH 24 PGS REGION BARASAT KADAMGACHI CCC 96 44 188 328
KOLKATA ZONE NORTH 24 PGS REGION BARASAT BARASAT GR CCC 475 127 93 695
KOLKATA ZONE NORTH 24 PGS REGION BARASAT NABAPALLY CCC 211 27 130 368
KOLKATA ZONE NORTH 24 PGS REGION BARASAT MADHYAMGRAM CCC 449 67 337 853
KOLKATA ZONE NORTH 24 PGS REGION BARASAT DUTTAPUKUR CCC 191 43 177 411
KOLKATA ZONE NORTH 24 PGS REGION BARASAT NOAPARA CCC 247 40 136 423
KOLKATA ZONE NORTH 24 PGS REGION BARASAT BARASAT-II CCC 438 34 147 619
KOLKATA ZONE NORTH 24 PGS REGION BARASAT DEGANGA CCC 85 62 171 318
KOLKATA ZONE NORTH 24 PGS REGION HABRA HABRA CCC 257 78 204 539
KOLKATA ZONE NORTH 24 PGS REGION HABRA GOBARDANGA CCC 191 195 206 592
KOLKATA ZONE NORTH 24 PGS REGION HABRA GAIGHATA CCC 168 186 281 635
KOLKATA ZONE NORTH 24 PGS REGION HABRA ASHOKNAGAR CCC 177 202 134 513
KOLKATA ZONE NORTH 24 PGS REGION HABRA GUMA CCC 77 97 62 236
KOLKATA ZONE NORTH 24 PGS REGION HABRA BANIPUR CCC 163 70 151 384
KOLKATA ZONE NORTH 24 PGS REGION NAIHATI HALISAHAR CCC 170 152 136 458
KOLKATA ZONE NORTH 24 PGS REGION NAIHATI JETIA CCC 59 14 50 123
KOLKATA ZONE NORTH 24 PGS REGION NAIHATI BHATPARA CCC 95 60 90 245
TOWN WISE CONSUMER BREAKUP
Zone Name Region Name Division Name Supply Office Name COMME
RCIAL GOVT. INDUS TRIAL
Grand Total
KOLKATA ZONE NORTH 24 PGS REGION NAIHATI KANKINARA CCC 73 96 213 382
KOLKATA ZONE NORTH 24 PGS REGION NAIHATI SHYAMNAGAR CCC 183 89 159 431
KOLKATA ZONE NORTH 24 PGS REGION NAIHATI ATPUR CCC 45 41 94 180
KOLKATA ZONE NORTH 24 PGS REGION NAIHATI KANCHRAPARA CCC 145 74 99 318
KOLKATA ZONE NORTH 24 PGS REGION NAIHATI KAMPA CCC 68 27 48 143
KOLKATA ZONE NORTH 24 PGS REGION NAIHATI NAIHATI CCC 134 67 87 288
KOLKATA ZONE NORTH 24 PGS REGION NAIHATI DEULPARA CCC 125 43 167 335
KOLKATA ZONE NORTH 24 PGS REGION BASIRHAT HASNABAD CCC 139 131 119 389
KOLKATA ZONE NORTH 24 PGS REGION BASIRHAT BHEBIA CCC 45 33 95 173
KOLKATA ZONE NORTH 24 PGS REGION BASIRHAT SWARUPNAGAR CCC 78 60 144 282
KOLKATA ZONE NORTH 24 PGS REGION BASIRHAT SANDESHKHALI CCC 47 40 43 130
KOLKATA ZONE NORTH 24 PGS REGION BASIRHAT HINGALGANJ CCC 62 48 99 209
KOLKATA ZONE NORTH 24 PGS REGION BASIRHAT BADURIA CCC 101 144 125 370
KOLKATA ZONE NORTH 24 PGS REGION BASIRHAT HAROA CCC 89 34 253 376
KOLKATA ZONE NORTH 24 PGS REGION BASIRHAT KEOTSHA CCC 81 22 105 208
KOLKATA ZONE NORTH 24 PGS REGION BASIRHAT KHOLAPATA CCC 155 116 259 530
KOLKATA ZONE NORTH 24 PGS REGION BASIRHAT BASHIRHAT CCC 226 232 183 641
KOLKATA ZONE NORTH 24 PGS REGION BASIRHAT MAITRABAGAN CCC 134 127 111 372
KOLKATA ZONE NORTH 24 PGS REGION BASIRHAT KATIAHAT CCC 55 50 127 232
KOLKATA ZONE NORTH 24 PGS REGION BONGAON BANGAON CCC 188 391 179 758
KOLKATA ZONE NORTH 24 PGS REGION BONGAON GOPALNAGAR CCC 129 128 305 562
KOLKATA ZONE NORTH 24 PGS REGION BONGAON BAGDA CCC 120 187 227 534
KOLKATA ZONE NORTH 24 PGS REGION BONGAON GANRAPATA CCC 42 137 108 287
KOLKATA ZONE NORTH 24 PGS REGION BONGAON THAKURNAGAR CCC 87 44 132 263
MIDNAPORE ZONE PASCHIM MIDNAPORE REGION KHARAGPUR MALANCHA CCC 208 231 152 591
MIDNAPORE ZONE PASCHIM MIDNAPORE REGION KHARAGPUR NIMPURA CCC 193 365 142 700
MIDNAPORE ZONE PASCHIM MIDNAPORE REGION KHARAGPUR KHARAGPUR CCC 301 157 117 575
TOWN WISE CONSUMER BREAKUP
Zone Name Region Name Division Name Supply Office Name COMME
RCIAL GOVT. INDUS TRIAL
Grand Total
MIDNAPORE ZONE PASCHIM MIDNAPORE REGION KHARAGPUR BALICHAK CCC 151 128 207 486
MIDNAPORE ZONE PASCHIM MIDNAPORE REGION KHARAGPUR SABONG CCC 85 194 172 451
MIDNAPORE ZONE PASCHIM MIDNAPORE REGION KHARAGPUR PINGLA CCC 110 295 246 651
MIDNAPORE ZONE PASCHIM MIDNAPORE REGION KHARAGPUR LOWADA CCC 55 212 183 450
MIDNAPORE ZONE PASCHIM MIDNAPORE REGION KHARAGPUR CHANDKURI CCC 72 85 153 310
MIDNAPORE ZONE PASCHIM MIDNAPORE REGION KHARAGPUR MADPUR CCC 112 138 199 449
MIDNAPORE ZONE PASCHIM MIDNAPORE REGION GHATAL DASPUR CCC 155 122 306 583
MIDNAPORE ZONE PASCHIM MIDNAPORE REGION GHATAL SONAKHALI CCC 111 68 281 460
MIDNAPORE ZONE PASCHIM MIDNAPORE REGION GHATAL GHATAL CCC 154 305 212 671
MIDNAPORE ZONE PASCHIM MIDNAPORE REGION GHATAL BIRSINGHAPUR CCC 62 238 157 457
MIDNAPORE ZONE PASCHIM MIDNAPORE REGION GHATAL RAMJIBANPUR CCC 71 97 77 245
MIDNAPORE ZONE PASCHIM MIDNAPORE REGION GHATAL CK TOWN CCC 149 561 178 888
MIDNAPORE ZONE PASCHIM MIDNAPORE REGION GHATAL UPPERKUAI CCC 52 73 81 206
MIDNAPORE ZONE PASCHIM MIDNAPORE REGION MIDNAPUR Midnapur CCC 347 387 81 815
MIDNAPORE ZONE PASCHIM MIDNAPORE REGION MIDNAPUR B R Sector CCC 175 138 50 363
MIDNAPORE ZONE PASCHIM MIDNAPORE REGION MIDNAPUR Barua CCC 155 283 198 636
MIDNAPORE ZONE PASCHIM MIDNAPORE MIDNAPUR Salboni CCC 95 378 93 566
TOWN WISE CONSUMER BREAKUP
Zone Name Region Name Division Name Supply Office Name COMME
RCIAL GOVT. INDUS TRIAL
Grand Total
REGION
MIDNAPORE ZONE PASCHIM MIDNAPORE REGION MIDNAPUR Anandapur CCC 111 277 166 554
MIDNAPORE ZONE PASCHIM MIDNAPORE REGION MIDNAPUR PIRAKATA CCC 69 166 68 303
MIDNAPORE ZONE PASCHIM MIDNAPORE REGION MIDNAPUR AMLAGOLA CCC 208 668 248 1124
MIDNAPORE ZONE PASCHIM MIDNAPORE REGION MIDNAPUR CHANDRAKONA ROAD CCC 222 409 250 881
MIDNAPORE ZONE PASCHIM MIDNAPORE REGION JHARGRAM Jhargram CCC 239 920 155 1314
MIDNAPORE ZONE PASCHIM MIDNAPORE REGION JHARGRAM Manikpara CCC 94 357 106 557
MIDNAPORE ZONE PASCHIM MIDNAPORE REGION JHARGRAM Jambonui CCC 71 266 62 399
MIDNAPORE ZONE PASCHIM MIDNAPORE REGION JHARGRAM Gopiballavpur CCC 147 512 109 768
MIDNAPORE ZONE PASCHIM MIDNAPORE REGION JHARGRAM Binpur CCC 86 646 148 880
MIDNAPORE ZONE PASCHIM MIDNAPORE REGION JHARGRAM BELPAHARI CCC 59 138 68 265
MIDNAPORE ZONE PASCHIM MIDNAPORE REGION BELDA BELDA CCC 114 190 175 479
MIDNAPORE ZONE PASCHIM MIDNAPORE REGION BELDA NAYAGRAM CCC 53 38 20 111
MIDNAPORE ZONE PASCHIM MIDNAPORE REGION BELDA SANKRAIL CCC 65 48 46 159
MIDNAPORE ZONE PASCHIM MIDNAPORE REGION BELDA KESHIARY CCC 122 111 89 322
MIDNAPORE ZONE PASCHIM MIDNAPORE REGION BELDA NARAYANGARH CCC 91 276 126 493
MIDNAPORE ZONE PASCHIM MIDNAPORE REGION BELDA DANTAN CCC 73 169 132 374
TOWN WISE CONSUMER BREAKUP
Zone Name Region Name Division Name Supply Office Name COMME
RCIAL GOVT. INDUS TRIAL
Grand Total
MIDNAPORE ZONE PASCHIM MIDNAPORE REGION BELDA MOHANPUR CCC 58 138 99 295
MIDNAPORE ZONE PASCHIM MIDNAPORE REGION BELDA KHAKURDA CCC 82 76 126 284
MIDNAPORE ZONE PURBA MIDNAPORE REGION TAMLUK NANDAKUMAR CCC 275 49 243 567
MIDNAPORE ZONE PURBA MIDNAPORE REGION TAMLUK MOINA CCC 287 20 160 467
MIDNAPORE ZONE PURBA MIDNAPORE REGION TAMLUK GOURANGAPUR CCC 101 35 170 306
MIDNAPORE ZONE PURBA MIDNAPORE REGION TAMLUK KOLAGHAT CCC 285 29 239 553
MIDNAPORE ZONE PURBA MIDNAPORE REGION TAMLUK GOPALNAGAR CCC 69 13 64 146
MIDNAPORE ZONE PURBA MIDNAPORE REGION TAMLUK PANSHKURA CCC 213 173 322 708
MIDNAPORE ZONE PURBA MIDNAPORE REGION TAMLUK PRATAPPUR CCC 100 226 126 452
MIDNAPORE ZONE PURBA MIDNAPORE REGION TAMLUK TAMLUK CCC 533 233 189 955
MIDNAPORE ZONE PURBA MIDNAPORE REGION TAMLUK MATANGINI CCC 288 25 209 522
MIDNAPORE ZONE PURBA MIDNAPORE REGION CONTAI CONTAI CCC 327 202 163 692
MIDNAPORE ZONE PURBA MIDNAPORE REGION CONTAI DIGHA CCC 821 57 204 1082
MIDNAPORE ZONE PURBA MIDNAPORE REGION CONTAI Marisda CCC 166 223 340 729
MIDNAPORE ZONE PURBA MIDNAPORE REGION CONTAI Pichaboni CCC 266 46 374 686
MIDNAPORE ZONE PURBA MIDNAPORE REGION CONTAI MUKUNDAPUR CCC 118 32 212 362
MIDNAPORE ZONE PURBA MIDNAPORE REGION CONTAI KHEJURI CCC 142 67 241 450
MIDNAPORE ZONE PURBA MIDNAPORE REGION CONTAI MADHAKHALI CCC 106 64 207 377
MIDNAPORE ZONE PURBA MIDNAPORE REGION HALDIA CHANDIPUR CCC 156 40 150 346
MIDNAPORE ZONE PURBA MIDNAPORE REGION HALDIA MAHISADAL CCC 189 45 241 475
MIDNAPORE ZONE PURBA MIDNAPORE REGION HALDIA NANDIGRAM CCC 188 33 140 361
MIDNAPORE ZONE PURBA MIDNAPORE REGION HALDIA BRAJALALCHAK CCC 253 106 162 521
MIDNAPORE ZONE PURBA MIDNAPORE REGION HALDIA CHAITANYAPUR CCC 150 63 205 418
MIDNAPORE ZONE PURBA MIDNAPORE REGION HALDIA DURGACHAK CCC 432 209 118 759
MIDNAPORE ZONE PURBA MIDNAPORE REGION EGRA EGRA CCC 128 129 97 354
MIDNAPORE ZONE PURBA MIDNAPORE REGION EGRA BHAGABANPUR CCC 100 732 184 1016
MIDNAPORE ZONE PURBA MIDNAPORE REGION EGRA PATASHPUR CCC 81 342 216 639
MIDNAPORE ZONE PURBA MIDNAPORE REGION EGRA CHOREPALIA CCC 59 103 118 280
TOWN WISE CONSUMER BREAKUP
Zone Name Region Name Division Name Supply Office Name COMME
RCIAL GOVT. INDUS TRIAL
Grand Total
MIDNAPORE ZONE PURBA MIDNAPORE REGION EGRA BALIGHAI CCC 80 20 167 267
MIDNAPORE ZONE PURBA MIDNAPORE REGION EGRA AMARSHI CCC 69 196 231 496
MIDNAPORE ZONE BANKURA REGION BANKURA BELIATORE CCC 74 110 69 253
MIDNAPORE ZONE BANKURA REGION BANKURA BARJORA CCC 114 118 152 384
MIDNAPORE ZONE BANKURA REGION BANKURA MAJIA CCC 62 24 65 151
MIDNAPORE ZONE BANKURA REGION BANKURA GANGAJALGHATI CCC 114 47 172 333
MIDNAPORE ZONE BANKURA REGION BANKURA SALTORA CCC 74 40 267 381
MIDNAPORE ZONE BANKURA REGION BANKURA JHANTIPAHARI CCC 78 50 128 256
MIDNAPORE ZONE BANKURA REGION BANKURA CHHATNA CCC 101 66 132 299
MIDNAPORE ZONE BANKURA REGION BANKURA PATPUR SECTOR CCC 205 275 84 564
MIDNAPORE ZONE BANKURA REGION BANKURA SCHOOLDANGA SECTOR CCC 217 138 79 434
MIDNAPORE ZONE BANKURA REGION BANKURA LALBAZAR SECTOR CCC 216 161 257 634
MIDNAPORE ZONE BANKURA REGION BISHNUPUR BISHNUPUR CCC 233 538 189 960
MIDNAPORE ZONE BANKURA REGION BISHNUPUR PATRASAYER CCC 76 752 155 983
MIDNAPORE ZONE BANKURA REGION BISHNUPUR JOYPUR CCC 94 858 160 1112
MIDNAPORE ZONE BANKURA REGION BISHNUPUR KOTULPUR CCC 118 531 192 841
MIDNAPORE ZONE BANKURA REGION BISHNUPUR ONDA CCC 150 255 195 600
MIDNAPORE ZONE BANKURA REGION BISHNUPUR SONAMUKHI CCC 110 537 164 811
MIDNAPORE ZONE BANKURA REGION BISHNUPUR INDUS CCC 65 158 127 350
MIDNAPORE ZONE BANKURA REGION BISHNUPUR RADHANAGAR CCC 48 106 60 214
MIDNAPORE ZONE BANKURA REGION KHATRA KHATRA CCC 102 75 115 292
MIDNAPORE ZONE BANKURA REGION KHATRA INDPUR CCC 85 79 142 306
MIDNAPORE ZONE BANKURA REGION KHATRA RANIBANDH CCC 68 80 73 221
MIDNAPORE ZONE BANKURA REGION KHATRA SARENGA CCC 51 267 76 394
MIDNAPORE ZONE BANKURA REGION KHATRA SIMLAPAL CCC 78 97 133 308
MIDNAPORE ZONE BANKURA REGION KHATRA TALDANGRA CCC 96 346 132 574
MIDNAPORE ZONE BANKURA REGION KHATRA HIRBANDH CCC 41 41 52 134
MIDNAPORE ZONE BANKURA REGION KHATRA RAIPUR CCC 81 124 106 311
MIDNAPORE ZONE PURULIA REGION PURULIA TELKALPARA CCC 231 123 441 795
TOWN WISE CONSUMER BREAKUP
Zone Name Region Name Division Name Supply Office Name COMME
RCIAL GOVT. INDUS TRIAL
Grand Total
MIDNAPORE ZONE PURULIA REGION PURULIA JOYPUR CCC 69 31 141 241
MIDNAPORE ZONE PURULIA REGION PURULIA ARSHA CCC 46 25 84 155
MIDNAPORE ZONE PURULIA REGION PURULIA JHALDA CCC 163 155 115 433
MIDNAPORE ZONE PURULIA REGION PURULIA BALARAMPUR CCC 88 70 205 363
MIDNAPORE ZONE PURULIA REGION PURULIA BAGMUNDI CCC 101 40 87 228
MIDNAPORE ZONE PURULIA REGION PURULIA BARABAZAR CCC 72 40 220 332
MIDNAPORE ZONE PURULIA REGION PURULIA PURULIA CCC 347 353 168 868
MIDNAPORE ZONE PURULIA REGION PURULIA BUNDWAN CCC 76 48 99 223
MIDNAPORE ZONE PURULIA REGION RAGHUNATHPUR HURA CCC 85 73 93 251
MIDNAPORE ZONE PURULIA REGION RAGHUNATHPUR RAGHUNATHPUR CCC 124 161 106 391
MIDNAPORE ZONE PURULIA REGION RAGHUNATHPUR SALTORE CCC 92 60 73 225
MIDNAPORE ZONE PURULIA REGION RAGHUNATHPUR SANTURI CCC 60 44 68 172
MIDNAPORE ZONE PURULIA REGION RAGHUNATHPUR CHELIAMA CCC 60 35 56 151
MIDNAPORE ZONE PURULIA REGION RAGHUNATHPUR ADRA CCC 45 74 41 160
MIDNAPORE ZONE PURULIA REGION RAGHUNATHPUR ANARA CCC 50 20 62 132
MIDNAPORE ZONE PURULIA REGION RAGHUNATHPUR DUBRAPARA CCC 61 56 128 245
MIDNAPORE ZONE PURULIA REGION RAGHUNATHPUR KASHIPUR CCC 73 76 141 290
MIDNAPORE ZONE PURULIA REGION RAGHUNATHPUR MANBAZAR CCC 106 75 202 383
MIDNAPORE ZONE PURULIA REGION RAGHUNATHPUR PUNCHA CCC 38 35 79 152
BERHAMPORE ZONE MURSHIDABAD REGION BERHAMPORE KHAGRA SECTOR CCC 297 139 22 458
BERHAMPORE ZONE MURSHIDABAD REGION BERHAMPORE GORABAZAR SECTOR CCC 343 373 23 739
BERHAMPORE ZONE MURSHIDABAD REGION BERHAMPORE COSSIMBAZAR SECTOR CCC 88 41 87 216
BERHAMPORE ZONE MURSHIDABAD REGION BERHAMPORE BERHAMPORE CCC 229 95 428 752
BERHAMPORE ZONE MURSHIDABAD REGION BERHAMPORE BEHARAN CCC 125 149 512 786
BERHAMPORE ZONE MURSHIDABAD REGION BERHAMPORE BELDANGA CCC 110 90 222 422
BERHAMPORE ZONE MURSHIDABAD REGION BERHAMPORE REJINAGAR CCC 56 91 181 328
BERHAMPORE ZONE MURSHIDABAD REGION BERHAMPORE AMTALA CCC 104 113 335 552
BERHAMPORE ZONE MURSHIDABAD REGION BERHAMPORE SARGACHHI CCC 80 40 181 301
BERHAMPORE ZONE MURSHIDABAD REGION RAGHUNATHGANJ RAGHUTATHGANJ CCC 241 155 365 761
TOWN WISE CONSUMER BREAKUP
Zone Name Region Name Division Name Supply Office Name COMME
RCIAL GOVT. INDUS TRIAL
Grand Total
BERHAMPORE ZONE MURSHIDABAD REGION RAGHUNATHGANJ JANGIPUR CCC 91 85 199 375
BERHAMPORE ZONE MURSHIDABAD REGION RAGHUNATHGANJ AURANGABAD CCC 122 60 202 384
BERHAMPORE ZONE MURSHIDABAD REGION RAGHUNATHGANJ DHULIAN CCC 173 69 358 600
BERHAMPORE ZONE MURSHIDABAD REGION RAGHUNATHGANJ FARAKKA CCC 119 230 122 471
BERHAMPORE ZONE MURSHIDABAD REGION RAGHUNATHGANJ AHIRAN CCC 55 54 130 239
BERHAMPORE ZONE MURSHIDABAD REGION RAGHUNATHGANJ SAGARDIGHI CCC 145 164 310 619
BERHAMPORE ZONE MURSHIDABAD REGION KANDI KANDI CCC 125 117 150 392
BERHAMPORE ZONE MURSHIDABAD REGION KANDI BHARATPUR CCC 41 59 100 200
BERHAMPORE ZONE MURSHIDABAD REGION KANDI SALAR CCC 82 77 175 334
BERHAMPORE ZONE MURSHIDABAD REGION KANDI PANCHTHUPI CCC 102 89 200 391
BERHAMPORE ZONE MURSHIDABAD REGION KANDI KHARGRAM CCC 89 77 212 378
BERHAMPORE ZONE MURSHIDABAD REGION KANDI GOALJAN CCC 81 118 212 411
BERHAMPORE ZONE MURSHIDABAD REGION KANDI SHAKTIPUR CCC 47 50 135 232
BERHAMPORE ZONE MURSHIDABAD REGION KANDI GOKARNA CCC 66 159 184 409
BERHAMPORE ZONE MURSHIDABAD REGION DOMKAL DIVISION CHAKISLAMPUR CCC 83 85 220 388
BERHAMPORE ZONE MURSHIDABAD REGION DOMKAL DIVISION DAULATABAD CCC 60 96 268 424
BERHAMPORE ZONE MURSHIDABAD REGION DOMKAL DIVISION DOMKAL CCC 173 258 620 1051
BERHAMPORE ZONE MURSHIDABAD REGION DOMKAL DIVISION RANINAGAR CCC 98 100 247 445
BERHAMPORE ZONE MURSHIDABAD REGION DOMKAL DIVISION JALANGI CCC 115 112 314 541
BERHAMPORE ZONE MURSHIDABAD REGION JIAGANJ DIVISION AZIMGUNJ CCC 39 47 94 180
BERHAMPORE ZONE MURSHIDABAD REGION JIAGANJ DIVISION BHAGABANGOLA CCC 107 171 357 635
BERHAMPORE ZONE MURSHIDABAD REGION JIAGANJ DIVISION NABAGRAM CCC 116 470 281 867
BERHAMPORE ZONE MURSHIDABAD REGION JIAGANJ DIVISION LALGOLA CCC 68 87 141 296
BERHAMPORE ZONE MURSHIDABAD REGION JIAGANJ DIVISION MURSHIDABAD MUNICIPAL TOWN CCC 168 162 207 537
BERHAMPORE ZONE MURSHIDABAD REGION JIAGANJ DIVISION JIAGANJ CCC 85 36 127 248
BERHAMPORE ZONE MURSHIDABAD REGION JIAGANJ DIVISION MAYA CCC 62 82 139 283
BERHAMPORE ZONE NADIA REGION KALYANI CHAKDAH(WEST) CCC 76 87 125 288
BERHAMPORE ZONE NADIA REGION KALYANI SUBARNAPUR CCC 112 83 146 341
TOWN WISE CONSUMER BREAKUP
Zone Name Region Name Division Name Supply Office Name COMME
RCIAL GOVT. INDUS TRIAL
Grand Total
BERHAMPORE ZONE NADIA REGION KALYANI MADANPUR CCC 116 53 133 302
BERHAMPORE ZONE NADIA REGION KALYANI NAGARUKHRA CCC 54 61 188 303
BERHAMPORE ZONE NADIA REGION KALYANI CHAKDA(E) CCC 142 90 239 471
BERHAMPORE ZONE NADIA REGION KALYANI EAST BISHNUPUR CCC 73 41 322 436
BERHAMPORE ZONE NADIA REGION KALYANI KALYANI SECTOR OFFICE CCC 438 751 193 1382
BERHAMPORE ZONE NADIA REGION KALYANI GAYESHPUR SECTOR OFFICE CCC 98 72 90 260
BERHAMPORE ZONE NADIA REGION KRISHNANAGAR KISHANGANJ CCC 110 201 236 547
BERHAMPORE ZONE NADIA REGION KRISHNANAGAR SWARUPGANJ CCC 118 46 104 268
BERHAMPORE ZONE NADIA REGION KRISHNANAGAR BAGULA CCC 118 122 160 400
BERHAMPORE ZONE NADIA REGION KRISHNANAGAR KRISHNAGAR ROAD STATION CCC 170 122 271 563
BERHAMPORE ZONE NADIA REGION KRISHNANAGAR CHITRASALI CCC 81 87 120 288
BERHAMPORE ZONE NADIA REGION KRISHNANAGAR KRISHNAGAR TOWN CCC 457 272 157 886
BERHAMPORE ZONE NADIA REGION KRISHNANAGAR NABADWEEP CCC 234 39 162 435
BERHAMPORE ZONE NADIA REGION TEHATTA PANCHADHARA ABHAYANAGAR CCC 73 113 263 449
BERHAMPORE ZONE NADIA REGION TEHATTA CHAPRA CCC 135 136 490 761
BERHAMPORE ZONE NADIA REGION TEHATTA KARIMPUR CCC 171 149 304 624
BERHAMPORE ZONE NADIA REGION TEHATTA TEHATTA CCC 102 159 233 494
BERHAMPORE ZONE NADIA REGION TEHATTA NAZIRPUR CCC 101 82 273 456
BERHAMPORE ZONE NADIA REGION RANAGHAT ARANGHATA CCC 126 91 254 471
BERHAMPORE ZONE NADIA REGION RANAGHAT AISHTOLA SECTOR OFFICE CCC 70 89 458 617
BERHAMPORE ZONE NADIA REGION RANAGHAT GANGNAPUR CCC 57 46 142 245
BERHAMPORE ZONE NADIA REGION RANAGHAT RANAGHAT(E) CCC 88 100 168 356
BERHAMPORE ZONE NADIA REGION RANAGHAT RANAGHAT(WEST) CCC 195 235 198 628
BERHAMPORE ZONE NADIA REGION RANAGHAT ULABINNAGAR CCC 73 144 399 616
BERHAMPORE ZONE NADIA REGION RANAGHAT BADKULLA CCC 78 101 228 407
BERHAMPORE ZONE NADIA REGION RANAGHAT DIGNAGAR CCC 65 75 149 289
BERHAMPORE ZONE NADIA REGION RANAGHAT FULIA CCC 118 87 112 317
BERHAMPORE ZONE NADIA REGION RANAGHAT SANTIPUR CCC 200 58 78 336
TOWN WISE CONSUMER BREAKUP
Zone Name Region Name Division Name Supply Office Name COMME
RCIAL GOVT. INDUS TRIAL
Grand Total
BERHAMPORE ZONE NADIA REGION RANAGHAT SUTRAGARH CCC 228 49 104 381
BERHAMPORE ZONE NADIA REGION NAKASI PARA BETHUADAHARI CCC 177 176 374 727
BERHAMPORE ZONE NADIA REGION NAKASI PARA DEBAGRAM CCC 84 73 249 406
BERHAMPORE ZONE NADIA REGION NAKASI PARA DHUBULIA CCC 78 88 199 365
BERHAMPORE ZONE NADIA REGION NAKASI PARA MOTIARY CCC 21 25 140 186
BERHAMPORE ZONE NADIA REGION NAKASI PARA MURAGACHA_DHARMADA CCC 66 42 148 256
BERHAMPORE ZONE NADIA REGION NAKASI PARA PALASSEY CCC 82 44 241 367
BERHAMPORE ZONE MALDA REGION SOUTH MALDA OLD MALDA CCC 169 241 423 833
BERHAMPORE ZONE MALDA REGION SOUTH MALDA MATHURAPUR CCC 87 105 221 413
BERHAMPORE ZONE MALDA REGION SOUTH MALDA GOLAPGANJ CCC 64 22 189 275
BERHAMPORE ZONE MALDA REGION SOUTH MALDA AIHO CCC 96 107 212 415
BERHAMPORE ZONE MALDA REGION SOUTH MALDA BAISHNABNAGAR CCC 79 25 122 226
BERHAMPORE ZONE MALDA REGION SOUTH MALDA KALIACHAK CCC 86 27 173 286
BERHAMPORE ZONE MALDA REGION SOUTH MALDA MOTHABARI CCC 73 68 173 314
BERHAMPORE ZONE MALDA REGION SOUTH MALDA SUJAPUR CCC 60 7 283 350
BERHAMPORE ZONE MALDA REGION SOUTH MALDA RATHBARI CCC 295 216 194 705
BERHAMPORE ZONE MALDA REGION SOUTH MALDA FULBARI CCC 142 195 119 456
BERHAMPORE ZONE MALDA REGION SOUTH MALDA MOKDUMPUR CCC 260 334 127 721
BERHAMPORE ZONE MALDA REGION NORTH MALDA BHALUKA CCC 52 47 243 342
BERHAMPORE ZONE MALDA REGION NORTH MALDA SAMSI CCC 101 184 296 581
BERHAMPORE ZONE MALDA REGION NORTH MALDA PARANPUR CCC 67 72 168 307
BERHAMPORE ZONE MALDA REGION NORTH MALDA CHANCHAL CCC 87 127 183 397
BERHAMPORE ZONE MALDA REGION NORTH MALDA MALATIPUR CCC 60 56 217 333
BERHAMPORE ZONE MALDA REGION NORTH MALDA HARISHCHANDRAPUR CCC 71 82 252 405
BERHAMPORE ZONE MALDA REGION NORTH MALDA GAJOL CCC 177 273 340 790
BERHAMPORE ZONE MALDA REGION NORTH MALDA BAMONGOLA CCC 68 52 150 270
BERHAMPORE ZONE MALDA REGION NORTH MALDA KUSHIDA CCC 34 152 186
SILIGURI ZONE DARJEELING REGION SILIGURI MILANPALLY CCC 506 276 159 941
SILIGURI ZONE DARJEELING REGION SILIGURI NJP GATEBAZAR CCC 224 140 156 520
TOWN WISE CONSUMER BREAKUP
Zone Name Region Name Division Name Supply Office Name COMME
RCIAL GOVT. INDUS TRIAL
Grand Total
SILIGURI ZONE DARJEELING REGION SILIGURI SUBHASPALLY SECTOR CCC 182 106 222 510
SILIGURI ZONE DARJEELING REGION SILIGURI HAKIMPARA SECTOR CCC 355 195 22 572
SILIGURI ZONE DARJEELING REGION SILIGURI POWER HOUSE SECTOR CCC 1205 156 242 1603
SILIGURI ZONE DARJEELING REGION SILIGURI PRADHANNAGAR SECTOR CCC 394 227 59 680
SILIGURI ZONE DARJEELING REGION SILIGURI SILIGURI TOWN CCC 534 84 23 641
SILIGURI ZONE DARJEELING REGION KURSEONG SONADA CCC 34 16 8 58
SILIGURI ZONE DARJEELING REGION KURSEONG MIRIK CCC 64 55 2 121
SILIGURI ZONE DARJEELING REGION KURSEONG KURSEONG CCC 130 154 11 295
SILIGURI ZONE DARJEELING REGION DARJEELING SUKHIAPOKHRIA CCC 32 32 9 73
SILIGURI ZONE DARJEELING REGION DARJEELING TAKDAH CCC 37 16 2 55
SILIGURI ZONE DARJEELING REGION DARJEELING BIJANBARI CCC 32 37 11 80
SILIGURI ZONE DARJEELING REGION DARJEELING LODHAMA CCC 17 4 21
SILIGURI ZONE DARJEELING REGION DARJEELING DARJEELING CCC 519 169 13 701
SILIGURI ZONE DARJEELING REGION SILIGURI SUB-URBAN NAXALBARI CCC 153 54 44 251
SILIGURI ZONE DARJEELING REGION SILIGURI SUB-URBAN PHANSIDEWA CCC 235 83 99 417
SILIGURI ZONE DARJEELING REGION SILIGURI SUB-URBAN KHARIBARI CCC 132 63 97 292
SILIGURI ZONE DARJEELING REGION SILIGURI SUB-URBAN BAGDOGRA CCC 133 28 26 187
SILIGURI ZONE DARJEELING REGION SILIGURI SUB-URBAN BIDHAN NAGAR CCC 145 36 38 219
SILIGURI ZONE DARJEELING REGION SILIGURI SUB-URBAN MATIGARA CCC 444 53 84 581
SILIGURI ZONE DARJEELING REGION SILIGURI SUB-URBAN SHIBMANDIR CCC 128 27 18 173
SILIGURI ZONE DARJEELING REGION KALINGPONG KALINGPONG CCC 196 171 28 395
SILIGURI ZONE DARJEELING REGION KALINGPONG TEESTA BAZAR CCC 22 14 1 37
SILIGURI ZONE DARJEELING REGION KALINGPONG MONGPU CCC 13 23 36
SILIGURI ZONE DARJEELING REGION KALINGPONG PEDONG CCC 53 37 5 95
SILIGURI ZONE DARJEELING REGION KALINGPONG SINJEE CCC 25 15 2 42
SILIGURI ZONE JALPAIGURI REGION JALPAIGURI HALDIBARI CCC 89 88 131 308
SILIGURI ZONE JALPAIGURI REGION JALPAIGURI BELACOVA CCC 249 81 93 423
SILIGURI ZONE JALPAIGURI REGION JALPAIGURI FULBARIHAT CCC 272 28 185 485
SILIGURI ZONE JALPAIGURI REGION JALPAIGURI MOINAGURI CCC 185 180 214 579
TOWN WISE CONSUMER BREAKUP
Zone Name Region Name Division Name Supply Office Name COMME
RCIAL GOVT. INDUS TRIAL
Grand Total
SILIGURI ZONE JALPAIGURI REGION JALPAIGURI CHANGRABANDHA CCC. 117 123 131 371
SILIGURI ZONE JALPAIGURI REGION JALPAIGURI BHOTPATTY CCC 45 24 89 158
SILIGURI ZONE JALPAIGURI REGION JALPAIGURI DHUPGURI CCC 216 151 390 757
SILIGURI ZONE JALPAIGURI REGION JALPAIGURI PANDAPARA &NAYABASTI SECTOR CCC 245 295 130 670
SILIGURI ZONE JALPAIGURI REGION JALPAIGURI MASKALAIBARI &UKILPARA SECTOR CCC 359 295 193 847
SILIGURI ZONE JALPAIGURI REGION MAL MAL CCC 133 93 31 257
SILIGURI ZONE JALPAIGURI REGION MAL OODLABARI CCC 145 58 35 238
SILIGURI ZONE JALPAIGURI REGION MAL METTELI CCC 130 88 27 245
SILIGURI ZONE JALPAIGURI REGION MAL JHALUNGPAREN CCC 46 16 2 64
SILIGURI ZONE JALPAIGURI REGION MAL NAGRAKATA CCC 77 43 45 165
SILIGURI ZONE JALPAIGURI REGION MAL BANERHAT CCC 82 82 37 201
SILIGURI ZONE JALPAIGURI REGION MAL KANTI CCC 108 63 67 238
SILIGURI ZONE RAIGUNJ REGION UTTAR DINAJPUR ITAHAR CCC 131 164 321 616
SILIGURI ZONE RAIGUNJ REGION UTTAR DINAJPUR HEMTABAD CCC 61 97 212 370
SILIGURI ZONE RAIGUNJ REGION UTTAR DINAJPUR KALIAGANJ CCC 134 316 540 990
SILIGURI ZONE RAIGUNJ REGION UTTAR DINAJPUR RAIGANJ CCC 305 346 356 1007
SILIGURI ZONE RAIGUNJ REGION UTTAR DINAJPUR BIRNAGAR CCC 190 298 359 847
SILIGURI ZONE RAIGUNJ REGION UTTAR DINAJPUR KARANDIGHI CCC 105 94 424 623
SILIGURI ZONE RAIGUNJ REGION ISLAMPUR ISLAMPUR CCC 327 232 208 767
SILIGURI ZONE RAIGUNJ REGION ISLAMPUR CHOPRA CCC 232 69 194 495
SILIGURI ZONE RAIGUNJ REGION ISLAMPUR DALKHOLA CCC 103 46 82 231
SILIGURI ZONE RAIGUNJ REGION ISLAMPUR GOALPOKHAR CCC 135 146 178 459
SILIGURI ZONE RAIGUNJ REGION ISLAMPUR KANKI CCC 126 57 155 338
SILIGURI ZONE COOCHBEHAR REGION COOCHBEHAR COOCHBEHAR CCC 481 252 213 946
SILIGURI ZONE COOCHBEHAR REGION COOCHBEHAR KHAGRABARI SECTOR CCC 106 81 135 322
SILIGURI ZONE COOCHBEHAR REGION COOCHBEHAR NEW-TOWN SECTOR CCC 142 90 236 468
SILIGURI ZONE COOCHBEHAR REGION COOCHBEHAR PUNDIBARI CCC 61 5 140 206
SILIGURI ZONE COOCHBEHAR REGION COOCHBEHAR TUFANGANJ CCC 148 111 330 589
TOWN WISE CONSUMER BREAKUP
Zone Name Region Name Division Name Supply Office Name COMME
RCIAL GOVT. INDUS TRIAL
Grand Total
SILIGURI ZONE COOCHBEHAR REGION COOCHBEHAR BOXIRHAT CCC 95 106 170 371
SILIGURI ZONE COOCHBEHAR REGION MATHABHANGA MATHABHANGA CCC 155 136 222 513
SILIGURI ZONE COOCHBEHAR REGION MATHABHANGA SITALKUNCHI CCC 65 62 141 268
SILIGURI ZONE COOCHBEHAR REGION MATHABHANGA DOLONGMORE CCC 83 41 138 262
SILIGURI ZONE COOCHBEHAR REGION DINHATA DINHATA CCC 152 128 222 502
SILIGURI ZONE COOCHBEHAR REGION DINHATA OKRABARI CCC 45 79 142 266
SILIGURI ZONE COOCHBEHAR REGION DINHATA DINHATA CCC -II 73 86 181 340
SILIGURI ZONE COOCHBEHAR REGION DINHATA SETAI CCC 45 48 74 167
SILIGURI ZONE COOCHBEHAR REGION DINHATA DEWANHAT CCC 36 3 146 185
SILIGURI ZONE ALIPURDUAR REGION ALIPURDUAR PURANBAZAR CCC 198 158 221 577
SILIGURI ZONE ALIPURDUAR REGION ALIPURDUAR KALCHINI CCC 99 52 38 189
SILIGURI ZONE ALIPURDUAR REGION ALIPURDUAR KAMAKHYAGURI CCC 113 88 208 409
SILIGURI ZONE ALIPURDUAR REGION ALIPURDUAR JAIGAON CCC 147 17 87 251
SILIGURI ZONE ALIPURDUAR REGION ALIPURDUAR SAMUKTALA CCC 67 36 67 170
SILIGURI ZONE ALIPURDUAR REGION ALIPURDUAR MADARIGHAT CCC 104 75 116 295
SILIGURI ZONE ALIPURDUAR REGION ALIPURDUAR BIRPARA CCC 113 88 166 367
SILIGURI ZONE ALIPURDUAR REGION ALIPURDUAR FALAKATA CCC 163 94 248 505
SILIGURI ZONE ALIPURDUAR REGION ALIPURDUAR MEJBIL CCC 37 61 98
SILIGURI ZONE ALIPURDUAR REGION ALIPURDUAR ALIPURDUAR TOWN CCC 182 179 119 480
SILIGURI ZONE DAKSHIN DINAJPUR BALURGHAT BALURGHAT CCC 279 470 204 953
SILIGURI ZONE DAKSHIN DINAJPUR BALURGHAT TAPAN CCC 129 109 168 406
SILIGURI ZONE DAKSHIN DINAJPUR BALURGHAT KUMARGANJ CCC 66 100 148 314
SILIGURI ZONE DAKSHIN DINAJPUR BALURGHAT HILI CCC 65 116 63 244
SILIGURI ZONE DAKSHIN DINAJPUR BALURGHAT PATIRAM CCC 74 75 138 287
SILIGURI ZONE DAKSHIN DINAJPUR BUNIADPUR BUNIADPUR CCC 92 136 166 394
SILIGURI ZONE DAKSHIN DINAJPUR BUNIADPUR KUSHMANDI CCC 99 101 238 438
SILIGURI ZONE DAKSHIN DINAJPUR BUNIADPUR HARIRAMPUR CCC 69 52 117 238
SILIGURI ZONE DAKSHIN DINAJPUR BUNIADPUR GANGARAMPUR CCC 248 223 240 711
BURDWAN ZONE BURDWAN REGION BURDWAN (NORTH) BHATAR CCC 140 87 191 418
TOWN WISE CONSUMER BREAKUP
Zone Name Region Name Division Name Supply Office Name COMME
RCIAL GOVT. INDUS TRIAL
Grand Total
BURDWAN ZONE BURDWAN REGION BURDWAN (NORTH) KURMUN CCC 46 19 41 106
BURDWAN ZONE BURDWAN REGION BURDWAN (NORTH) GALSI CCC 149 47 126 322
BURDWAN ZONE BURDWAN REGION BURDWAN (NORTH) GUSKARA CCC 177 103 227 507
BURDWAN ZONE BURDWAN REGION BURDWAN (NORTH) BONPAS CCC 37 35 59 131
BURDWAN ZONE BURDWAN REGION BURDWAN (NORTH) BUDBUD CCC 179 72 177 428
BURDWAN ZONE BURDWAN REGION ASANSOL HIRAPUR CCC 79 116 71 266
BURDWAN ZONE BURDWAN REGION ASANSOL DOMOHINI CCC 85 76 298 459
BURDWAN ZONE BURDWAN REGION ASANSOL RUPNARAYANPUR CCC 173 118 220 511
BURDWAN ZONE BURDWAN REGION ASANSOL RANIGUNJ CCC 366 240 271 877
BURDWAN ZONE BURDWAN REGION ASANSOL ASANSOLE CCC I 687 410 346 1443
BURDWAN ZONE BURDWAN REGION ASANSOL ASANSOLE CCC II 508 461 259 1228
BURDWAN ZONE BURDWAN REGION ASANSOL BARAKAR CCC 255 164 325 744
BURDWAN ZONE BURDWAN REGION DURGAPUR PANDAVESWAR CCC 70 20 97 187
BURDWAN ZONE BURDWAN REGION DURGAPUR JAMURIA CCC 139 89 192 420
BURDWAN ZONE BURDWAN REGION DURGAPUR UKHRA CCC 191 36 118 345
BURDWAN ZONE BURDWAN REGION DURGAPUR PANAGARH CCC 164 71 199 434
BURDWAN ZONE BURDWAN REGION DURGAPUR ANDAL CCC 148 51 130 329
BURDWAN ZONE BURDWAN REGION DURGAPUR GOPALPUR CCC 190 35 88 313
BURDWAN ZONE BURDWAN REGION DURGAPUR BENACHITI CCC 342 77 191 610
BURDWAN ZONE BURDWAN REGION DURGAPUR COKE OVEN (DURGAPUR) CCC 208 4 49 261
BURDWAN ZONE BURDWAN REGION DURGAPUR CITY CENTRE (DURGAPUR) CCC 551 168 1 720
BURDWAN ZONE BURDWAN REGION DURGAPUR BIDHANNAGAR (DURGAPUR) CCC 803 133 193 1129
BURDWAN ZONE BURDWAN REGION KATWA DAINHAT CCC 93 123 209 425
BURDWAN ZONE BURDWAN REGION KATWA KETUGRAM CCC 118 152 239 509
BURDWAN ZONE BURDWAN REGION KATWA NUTANHAT CCC 91 50 207 348
BURDWAN ZONE BURDWAN REGION KATWA KATWA CCC 221 323 340 884
BURDWAN ZONE BURDWAN REGION KALNA KALNA CCC 222 305 316 843
BURDWAN ZONE BURDWAN REGION KALNA BAIDYAPUR CCC 79 55 106 240
BURDWAN ZONE BURDWAN REGION KALNA DHATRIGRAM CCC 102 186 124 412
TOWN WISE CONSUMER BREAKUP
Zone Name Region Name Division Name Supply Office Name COMME
RCIAL GOVT. INDUS TRIAL
Grand Total
BURDWAN ZONE BURDWAN REGION KALNA SAMUDRAGARH CCC 132 172 218 522
BURDWAN ZONE BURDWAN REGION KALNA PURBASTHALI CCC 119 182 328 629
BURDWAN ZONE BURDWAN REGION KALNA MONTESWAR CCC 105 164 148 417
BURDWAN ZONE BURDWAN REGION MEMARI MEMARI CCC 192 214 230 636
BURDWAN ZONE BURDWAN REGION MEMARI SAKTIGARH CCC 123 103 147 373
BURDWAN ZONE BURDWAN REGION MEMARI JAMALPUR CCC 185 176 258 619
BURDWAN ZONE BURDWAN REGION MEMARI SATGACHIA CCC 147 135 139 421
BURDWAN ZONE BURDWAN REGION MEMARI NABASTHA CCC 47 46 35 128
BURDWAN ZONE BURDWAN REGION BURDWAN (SOUTH) BURDWAN-I CCC 602 213 231 1046
BURDWAN ZONE BURDWAN REGION BURDWAN (SOUTH) BURDWAN-II CCC 397 55 50 502
BURDWAN ZONE BURDWAN REGION BURDWAN (SOUTH) BURDWAN-III CCC 380 115 141 636
BURDWAN ZONE BURDWAN REGION BURDWAN (SOUTH) BURDWAN-IV CCC 122 42 197 361
BURDWAN ZONE BURDWAN REGION BURDWAN (SOUTH) KHANDAGHOSH CCC 91 58 148 297
BURDWAN ZONE BURDWAN REGION BURDWAN (SOUTH) RAINA CCC 146 122 230 498
BURDWAN ZONE BURDWAN REGION BURDWAN (SOUTH) MADHABDIHI CCC 68 51 100 219
BURDWAN ZONE BIRBHUM REGION SURI CHANDRAPUR CCC 87 46 106 239
BURDWAN ZONE BIRBHUM REGION SURI MD. BAZAR CCC 133 115 674 922
BURDWAN ZONE BIRBHUM REGION SURI SURI-WEST CCC 268 229 100 597
BURDWAN ZONE BIRBHUM REGION SURI DUBRAJPUR CCC 152 163 177 492
BURDWAN ZONE BIRBHUM REGION SURI KHOIRASOLE CCC 100 135 137 372
BURDWAN ZONE BIRBHUM REGION SURI SURI-EAST CCC 241 236 179 656
BURDWAN ZONE BIRBHUM REGION RAMPURHAT NALHATI CCC 146 162 550 858
BURDWAN ZONE BIRBHUM REGION RAMPURHAT MURARAI CCC 111 212 160 483
BURDWAN ZONE BIRBHUM REGION RAMPURHAT LOHAPUR CCC 62 58 120 240
BURDWAN ZONE BIRBHUM REGION RAMPURHAT PAIKAR CCC 93 115 197 405
BURDWAN ZONE BIRBHUM REGION RAMPURHAT SAINTHIA CCC 107 172 201 480
BURDWAN ZONE BIRBHUM REGION RAMPURHAT MAYURESWAR CCC 63 121 137 321
BURDWAN ZONE BIRBHUM REGION RAMPURHAT MALLARPUR CCC 156 122 304 582
BURDWAN ZONE BIRBHUM REGION RAMPURHAT RAMPURHAT CCC 326 358 397 1081
TOWN WISE CONSUMER BREAKUP
Zone Name Region Name Division Name Supply Office Name COMME
RCIAL GOVT. INDUS TRIAL
Grand Total
BURDWAN ZONE BIRBHUM REGION RAMPURHAT MARGRAM CCC 335 143 172 650
BURDWAN ZONE BIRBHUM REGION BOLPUR ILLAMBAZAR CCC 154 58 205 417
BURDWAN ZONE BIRBHUM REGION BOLPUR BOLPUR CCC 213 74 152 439
BURDWAN ZONE BIRBHUM REGION BOLPUR AHMEDPUR CCC 89 44 145 278
BURDWAN ZONE BIRBHUM REGION BOLPUR LABPUR CCC 98 51 157 306
BURDWAN ZONE BIRBHUM REGION BOLPUR KIRNAHAR CCC 122 86 283 491
BURDWAN ZONE BIRBHUM REGION BOLPUR SANTINIKETAN CCC 643 189 119 951
BURDWAN ZONE HOOGHLY REGION SREERAMPUR SERAMPUR CCC 248 67 290 605
BURDWAN ZONE HOOGHLY REGION SREERAMPUR MAKHLA CCC 95 21 231 347
BURDWAN ZONE HOOGHLY REGION SREERAMPUR RISHRA CCC 57 30 48 135
BURDWAN ZONE HOOGHLY REGION SREERAMPUR DANKUNI CCC 257 33 323 613
BURDWAN ZONE HOOGHLY REGION SREERAMPUR NABAGRAM CCC 102 16 74 192
BURDWAN ZONE HOOGHLY REGION SREERAMPUR CHANDITALA CCC 172 57 295 524
BURDWAN ZONE HOOGHLY REGION SREERAMPUR BEGAMPUR SECTOR CCC 120 48 184 352
BURDWAN ZONE HOOGHLY REGION CHANDANNAGAR BANDEL CCC 90 118 77 285
BURDWAN ZONE HOOGHLY REGION CHANDANNAGAR POLBA CCC 104 115 126 345
BURDWAN ZONE HOOGHLY REGION CHANDANNAGAR KHALISANI CCC 93 191 138 422
BURDWAN ZONE HOOGHLY REGION CHANDANNAGAR CHANDANNAGAR SECTOR1 CCC 75 162 84 321
BURDWAN ZONE HOOGHLY REGION CHANDANNAGAR CHANDANNAGAR SECTOR2 CCC 218 239 38 495
BURDWAN ZONE HOOGHLY REGION CHANDANNAGAR CHANDANNAGAR SECTOR3 CCC 76 119 67 262
BURDWAN ZONE HOOGHLY REGION CHANDANNAGAR MOGHAL TOOLI SECTOR CCC 161 219 32 412
BURDWAN ZONE HOOGHLY REGION CHANDANNAGAR TOLA-FATAK SECTOR CCC 140 185 49 374
BURDWAN ZONE HOOGHLY REGION CHANDANNAGAR PIPULPATI SECTOR CCC 112 259 63 434
BURDWAN ZONE HOOGHLY REGION CHANDANNAGAR BALIMOR SECTOR CCC 132 143 53 328
BURDWAN ZONE HOOGHLY REGION ARAMBAGH KAMARPUKUR CCC 96 125 148 369
BURDWAN ZONE HOOGHLY REGION ARAMBAGH ARAMBAG CCC 225 396 142 763
BURDWAN ZONE HOOGHLY REGION ARAMBAGH GOURHATI CCC 62 131 140 333
BURDWAN ZONE HOOGHLY REGION ARAMBAGH GOGHAT CCC 72 49 95 216
BURDWAN ZONE HOOGHLY REGION ARAMBAGH CHAMPADANGA CCC 40 46 117 203
TOWN WISE CONSUMER BREAKUP
Zone Name Region Name Division Name Supply Office Name COMME
RCIAL GOVT. INDUS TRIAL
Grand Total
BURDWAN ZONE HOOGHLY REGION ARAMBAGH PURSURAH CCC 93 103 283 479
BURDWAN ZONE HOOGHLY REGION ARAMBAGH ASHANPUR CCC 88 52 149 289
BURDWAN ZONE HOOGHLY REGION ARAMBAGH KHANAKUL CCC 58 89 132 279
BURDWAN ZONE HOOGHLY REGION ARAMBAGH RAJHATI CCC 64 73 158 295
BURDWAN ZONE HOOGHLY REGION TARAKESWAR MOSAT CCC 76 53 118 247
BURDWAN ZONE HOOGHLY REGION TARAKESWAR JANGIPARA CCC 66 97 155 318
BURDWAN ZONE HOOGHLY REGION TARAKESWAR RAJBALHAT CCC 47 54 76 177
BURDWAN ZONE HOOGHLY REGION TARAKESWAR JANGALPARA CCC 101 29 101 231
BURDWAN ZONE HOOGHLY REGION TARAKESWAR DADPUR CCC 83 81 93 257
BURDWAN ZONE HOOGHLY REGION TARAKESWAR DHANIAKHALI CCC 169 202 204 575
BURDWAN ZONE HOOGHLY REGION TARAKESWAR GURAP CCC 95 112 113 320
BURDWAN ZONE HOOGHLY REGION TARAKESWAR TARAKESWAR CCC 187 201 159 547
BURDWAN ZONE HOOGHLY REGION SINGUR NASIBPUR CCC 137 77 317 531
BURDWAN ZONE HOOGHLY REGION SINGUR SINGUR CCC 246 220 218 684
BURDWAN ZONE HOOGHLY REGION SINGUR HARIPAL CCC 132 153 185 470
BURDWAN ZONE HOOGHLY REGION SINGUR NALIKUL CCC 83 88 144 315
BURDWAN ZONE HOOGHLY REGION MOGRA KHANYAN CCC 31 67 50 148
BURDWAN ZONE HOOGHLY REGION MOGRA BOINCHEE CCC 64 111 101 276
BURDWAN ZONE HOOGHLY REGION MOGRA SOMRABAZAR CCC 90 191 231 512
BURDWAN ZONE HOOGHLY REGION MOGRA PANDUA CCC 139 143 181 463
BURDWAN ZONE HOOGHLY REGION MOGRA ADISAPTAGRAM CCC 90 33 132 255
BURDWAN ZONE HOOGHLY REGION MOGRA KHAMARGACHI CCC 33 72 103 208
BURDWAN ZONE HOOGHLY REGION MOGRA BANSBERIA CCC 54 85 60 199
BURDWAN ZONE HOOGHLY REGION MOGRA MOGRA CCC 136 171 186 493
Grand Total 86370 66365 93998 246733