ACCOUNTS
I) PERFORMANCE:
Notable Achievements and system improvement of 2014-15 (Upto December/2014). Payment through NEFT Mode:-
This office has already introduced Payment through NEFT in respect of:- a) PF withdrawal – All payments are made through NEFT mode. b) 100%Payment to Contractors/Suppliers – All payments are made through NEFT mode. c) All settlement Payment on retirement are being made in NEFT mode. d) For 2013-14, PLB Payment has been made as per mode of salary Payment. e) Payment of Salary through Bank/ECS/NEFT/ Cheque.
Month Total Salary Payment
Payment through ECS/NEFT/Bank/Cheque
Percentage
No. of Employees No. of Employees No. of Employees
Apr’14 25021 16732 66.87 % Dec’14 24905 18583 74.62%
Payment through Bank/ECS/NEFT/Cheque has improved by 7.75%.
Recovery of CUG : Programme for recovery of excess call charges for CUG users, has already been developed and implemented from the month of July2014. Single Wage Period : This is going to be implemented in Sealdah Division w.e. f. 01.02.2015. Implementation of IPAS : For implementation of IPAS, High Speed Internet Connectivity has been arranged, staff training imparted, hard ware arrangement is being made. IPAS in Sealdah has been planned for implementation w.e.f. 01.02.2015.
Total Savings up to December/2014
Due to intensive internal checking, this office has saved Rs. 2.69 crore up to
December/14 in respect of Estimates, Expenditure and Establishment related
bills etc.
E-Payment of Energy Bills :- An amount of Rs. 2.23 crore has been obtained
as Rebate for ECS Payment of HT Traction and non- traction bills up for the
period April’14 to December’14.
Revision of Pre-2006 Pension cases (Application Cases) : 100 %
achievement has been made in respect of applications received previously and
processed in terms of DOP & PW’s O.M. No. 38/37/08-P & PW(A), dated
01/9/2008 circulated under Rly. Boards’ letter No. F(E)iii/08/PNI/12, dated
08/9/2008.
Page no. 2
Single Window System (SWS) for re-imbursement of Pension:-
PPO(s) of the Pensioners are being dispatched to the Nodal Branch of the
nominated 17 Banks listed under SWS since July/2012.
Implementation of ARPAN: For ARPAN, Accounts Office is fully equipped with hardware, etc. ARPAN will be implemented from the month of January/2015 in Accounts department.
Book of Sanction : Vetting of BOS was a long pending issue in Sealdah Division. Due to concerted effort, BOS as on 01.04.2014 for all the Departments have been finalized and vetted by the Division. At present there is no pending.
Every staff of Accounts department Sealdah, who was working on the same seat for more than 4 years, has been transferred on rotation.
11) Position of Audit Cases in Sealdah Division as on 31.12.2014.
Particulars
OB as on
1.04.14
Accretion for the Year
Clearance for the Year
CB at the end of December/2014
CB at the end of December/2013
AIR Pt. I 13 9 8 14 9 Audit Note
Pt. I 3 2 0 5 2
Special Letters
3 0 0 3 2
Total 19 11 8 22 13
Note: One Special letter has been recommended for closer. Closer advice is awaited
from PDA.
12) Position of Stock Sheet in Sealdah Division as on 31.12.2014.
O.B as on 01.04.2014
Accretion for the year
Clearance for the year
CB at the end of December/2014.
CB at the end of December/2013.
Total 52 71 76 47 56
Page no. 3
PLAN HD.WISE EXPENDITURE UPTO DEC-14 FOR FINANCIAL YEAR-2014-15
Fig. in Crore
ALLOTEMENT FOR 2014-
15
EXP-Upto-Dec'-14
(Approximate ) % OF
UTILISATION
Exp. Upto-Dec'2013
PLAN HEAD 2013-14
16 (Traffic Facilities) 2.57 1.50 58% 2.20
29(Safety Works,Level Crossing) 4.11 1.55 38% 1.93
30(Safety Works,ROB/RUB) 8.87 2.50 28% 3.52
31(Track Renewal) 51.83 51.84 100% 53.79
32 (Bridge Works) 2.13 2.46 115% 2.62
33(Signal & Telecom Works) 3.24 1.59 49% 1.38
36(Other Elec.Works) 1.90 0.28 15% 1.46
37(Traction Wings) 6.21 3.72 60% 20.65
41(Machinary & Plant ) 2.14 0.73 34% 0.25
42(Workshop & Production Unit ) 4.44 4.80 108% 7.52
51(Staff Quarter) 1.54 2.80 182% 4.17
52(Staff Aminities) 4.42 4.12 93% 6.95
53(Passenger & Other users Aminities) 28.78 15.14 53% 16.84
64(Other Specified Works) 7.56 2.88 38% 1.70
TOTAL ==> 130.07 95.89 74% 124.98
REVENUE EXPENDITURE UP TO DEC-14 FOR FINANCIAL YEAR 2014-15
(Fig. in Crores of Rs.)
EXP DEMAND SL-2014-
15
BP UP TO DEC-
14 EXP. Variation Balance
Fund
Exp. Upto-Dec'2013
NOS. upto BP-Approx. Left over
SL
2013-14 2014-15 2014-15 Dec-14(
Approximate) (5) - (6) (4) - (6) 2013-14
2 3 4 5 6 7 8 9
56.23 03 A 60.53 44.68 44.05 0.63 16.48 43.82
134.68 04 B 132.68 111.82 117.05 -5.23 15.63 99.74
9.44 05 C 10.24 8.19 7.62 0.57 2.62 6.91
167.80 06 D 182.64 138.43 132.65 5.78 49.99 129.46
108.48 07 E 117.67 89.17 89.21 -0.04 28.46 79.79
216.67 08 F 222.37 179.00 182.12 -3.12 40.25 168.82
304.64 09 G 331.44 241.19 243.89 -2.70 87.55 235.61
329.62 10 H 347.45 257.05 258.39 -1.34 89.06 246.18
97.85 11 J 96.88 79.15 81.62 -2.47 15.26 72.45
88.25 12 K 94.35 66.68 66.20 0.48 28.15 63.25
1513.65 TOTAL 1596.25 1215.36 1222.80 -7.44 373.45 1146.03
1)At Col.-7 (-) indicates excess against over BP.
Page no. 4
Organizational Structure
a. Accounts Office
Category
Sanctioned
Strength On Roll Vacancy
Supervisor 28 23 5
Staff Gr -C 108 92 16
Group-D 13 13 0
Total 149 128 21
b. Cash Office
Category
Sanctioned
Strength On Roll Vacancy
Supervisor 3 01 02
Staff Gr -C 65 49 16
Group-D 24 21 03
Total 92 71 21
Sr.DFM K. Chakraborty
DFM-I
B. Ghosh
DFM-II
S. Mukherjee
ADFM-II S. Halder
Manpower
position
ADFM-PC M. Roychowdhury
Page no. 5
COMMERCIAL
I) PERFORMANCE:
SL. NO. ITEM UNIT
Target 2014-15 PERF. 2013-14 PERF.
2014-15 % VAR. OVER
Full. Yr.
Prop. Target Upto the Dec ’14
Cum upto
Dec ’13 FULL YR.
Cum upto
Dec ’14 LAST YR. Target
1 Passengers (Sub.)
Nos. in Crs. 71.385 53.998 51.427 67.986 49.174 -4.38 -8.93
Passengers (PRS)
Nos. in Crs. 0.647 0.467 0.435 0.602 0.471 8.28 0.86
Passengers (Non-PRS)
Nos. in Crs. 3.116 2.367 2.206 2.905 2.157 -2.22 -8.87
Passengers (Non-Sub.)
Nos. in Crs. 3.763 2.834 2.641 3.507 2.628 -0.49 -7.27
Passengers (Total)
Nos. in Crs. 75.148 56.832 54.068 71.493 51.802 -4.19 -8.85
2 Pass. Earning (Sub.)
Rs in Crs. 363.740 274.860 261.490 350.05 281.574 7.68 2.44
Passengers (PRS)
Nos. in Crs. 341.510 246.65 212.077 295.844 249.234 17.52 1.05
Pass. Earning (Non-PRS)
Rs in Crs. 165.630 146.120 80.931 106.40 91.207 12.70 -37.58
Pass. Earning (Non-Sub)
Rs in Crs. 507.140 392.770 293.008 402.249 340.441 16.19 -13.32
Pass. Earning (Total)
Rs in Crs. 870.880 667.630 554.498 752.294 622.015 12.18 -6.83
3 Sundry Earnings
Rs in Crs. 32.85 21.29 12.33 23.213 25.961 110.57 21.94
4 Oth. Coaching Earnings
Rs in Crs. 125.39 94.043 88.769 106.53 59.208 -33.30 -37.04
5 Goods Earnings
Rs in Crs. 254.59 180.11 181.89 236.86 167.62 -7.84 -6.93
6 Other Goods Earnings
Rs in Crs. - - 11.709 23.07 13.645 16.53 --
7 Total Goods Earnings
Rs in Crs. 254.59 180.11 193.595 259.930 181.266 -6.37 0.64
8 Penalty Cases
Nos. in Lakhs 3.031 2.267 1.941 2.594 2.237 15.25 -1.32
9 Penalty Earnings
Rs in Crs. 8.188 6.164 5.262 6.989 5.929 12.68 -3.81
10 UBL Cases
Nos. in Lakhs 4.214 3.119 2.944 3.982 3.045 3.43 -2.37
11 UBL Earnings
Rs in Crs. 3.995 2.942 2.775 3.768 2.92 5.23 -0.75
12 Parcel Weight (Parc+Lug)
Th. Tonne NA NA 178.1 223.164 143.294 -19.54 -
13 Parc. Earnings
(Parc+Lug) Rs in Crs. 45.76 34.35 27.326 38.256 30.846 12.88 -10.20
14 Car Parking
Rs in Lakhs 157.00 117.75 60.970 81.16 66.170 8.53 -43.80
15 Comml. Publicity
Rs in Lakhs - - 92.82 126.91 102.380 10.30 -
Gross Earnings (2+3+4+7)
Rs in Crs. 1283.71 963.07 849.19 1141.97 888.45 4.62 -7.75
IZZAT In Nos. - - 795006 809452 32318 -95.93 -
Page no. 6
STATION OUTSTANDING
Target (14-15) : 300.00 (Fig. in Lakhs)
HEADS As on 30/11/13 As on 30/11/14
Freight 27.053 38.114
D/C 852.663 346.257
W/C 30.031 4.54
Misc. 171.178 162.67
A/D 48.772 54.094
O/D 71.080 95.001
TOTAL 1200.777 700.676
Litigation 68.872 68.872
Total 1269.649 769.548
Achievements
� Total Passenger :- Total passenger movement during the period April to December 2014-15 was 51.80 Crores against 54.07 crores during the corresponding period of previous year. This is a decline of 4.19% over last year. During this period, 32318 nos. of ‘IZZAT’ MST have been sold, compared to 795006 nos. during the corresponding period of previous year. Growth of Total Passenger without MST (including IZZAT) was 5.00% upto the month of December’14.
� Suburban Passenger :- Suburban passenger recorded between April to December 2014-15 was 49.17 crores against 51.43 crores during the corresponding period of previous year. This is a decline of 4.38% over last year. Growth of Suburban Passenger without MST (including IZZAT) was 4.68% upto the month of December ’14.
� Non-Suburban Passenger :- Non- Suburban passenger recorded between April to December 2014-15 was 2.628 crores against 2.641 crores during the corresponding period of previous year. This is a decline of 0.49% over last year. Growth of Non-Suburban Passenger without MST (including IZZAT) was 1.92% upto the month of December ’14.
� Total Passenger Earnings :- Total Passenger Earnings between April to December 2014-15 was 622.016 crores against 554.498 Crores during the corresponding period of previous year. This is a growth of 12.18% higher over last year.
� Suburban Passenger Earnings :- Suburban Passenger earnings between April to December 2014-15 was 281.574 crores against 261.490 Crores during the corresponding period of previous year, thereby recording a growth of 7.68% over last year.
Page no. 7
� Non-Suburban Passenger Earnings :- Non-suburban passenger earnings recorded between April to December 2014-15 was 340.442 Crores against 293.008 crores during the corresponding period of previous year, thereby a growth of 16.19% over last year.
� Goods Earnings :- Goods Earnings recorded between April to December 2014-15 was 181.266 crores against 193.595 during the corresponding period of previous year, thereby recording a decline of 6.37% over last year. This is due to less patronization of Gunny bales at Titagarh and Naihati.
� Other Coaching Earnings :- Other Coaching earnings recorded between April to December 2014-15 was 59.21 crores against 88.77 Crores during the corresponding period of previous year, thereby recording a decline of 33.30% less over last year. It is due to less loading of leased VPs from Sealdah and Kolkata Terminal. Moreover less number of special trains were booked from different stations of Sealdah division compared to previous year.
� Parcel Loading :- Parcel Loading recorded between April to December 2014-15 was 70.88 thousand Tones against 92.55 thousand tones during the corresponding period of previous year, thereby recording a decline of 23.42% over last year.
� Parcel Earnings :- Parcel Earning between April to December 2014-15 was 25.795 Crores against 22.546 crores during the corresponding period of previous year, thereby recording a growth of 14.41% higher over last year.
� Luggage Loading :- Luggage Loading recorded between April to December 2014-15 was 72.41 thousand tones against 75.55 thousand tones during the corresponding period of previous year, thereby recording a decline of 4.15% less over last year.
� Luggage Earnings :- Luggage Earning between April to December 2014-15 was 5.05 Crores against 4.78 crores during the corresponding period of previous year, thereby recording a growth of 5.59% higher over last year.
� IZZAT Season Tickets :- IZZAT season ticket introduced in August 2009 has been a hit among passengers living below poverty line. During April to December 2014-15, 0.32 lakhs against 7.95 lakhs IZZAT season tickets were issued from different stations over Sealdah division, thereby recording a decline of 95.93% over last year.
� Penalty Cases :- Detected Penalty cases between April to December 2014-15 was 2.237 lakhs against 1.941 lakhs during the corresponding period of previous year, thereby recording a growth of 15.3% higher over last year.
� Penalty Earnings :- Penalty Earning between April to December 2014-15 was 5.929 Crores against 5.262 crores during the corresponding period of previous year, thereby recording a growth of 12.7% higher over last year.
� Un-booked Luggage Cases :- Un-booked Luggage cases between April to December 2014-15 was 3.04 lakhs against 2.94 lakhs during the corresponding period of previous year, thereby recording a growth of 3.4% over last year.
Page no. 8
� Un-booked Luggage Earnings :- Earnings from un-booked Luggage between April to December 2014-15 was 2.92 crores against 2.78 crores during the corresponding period of previous year, thereby recording a growth of 5.2% over last year.
� Complaints :- Complaints are being monitored with an effect to improve the shortcomings noticed by commuters. On-board complaints recorded in trains especially Rajdhani express, Duranto express, Darjeeling Mail, Gour express etc. are being forwarded to concerned areas in order to set right the shortcomings or defects. Officers of the commercial branch are contacting the complainants wherever phone numbers are provided by the complainants.
� UTS :- Modernization of Booking Offices by introduction of UTS. Total number of stations provided with UTS : 146
� PRS :- 35 PRS locations and 35 UTS-cum-PRS locations including 1 Mobile Ticketing Vans are operational over Sealdah Division. This apart, 17 PRS locations under Non-Railway Head are operational.
� JTBS:- 45 JTBS (Jansadharan Ticket Booking Sewak) counters are operational at 28 locations over the Division.
� STBS :- 04 STBS (Station Ticket Booking Sewak) are operational at Dhubulia, Muragachha, Debagram and Sargachhi.
� Battery Operated Vehicle :- Two Eco-friendly battery operated vehicles are available at Sealdah station for the convenience and movement of senior citizens and physically challenged persons (both men & women) within the station premises free of cost.
� Cleanliness :- To improve cleanliness at stations, Cleanliness contracts have been awarded at 35 flag stations and at 16 flag-stations, cleanliness is done through Imprest cash.
� Pay & Use Toilet facility :- Contract for running and cleanliness of Pay & use Complex is awarded at 70 locations and 41 Pay & Use Toilet are under process.
� ATVM :- 48 ATVM have been installed at NH, KPA, SNR, BP, KDH, SEP, AGP, BLH, SDAH, DDJ, BNXR, DDC, BT, TLG, BLN, JDP, NGRI, GIA, BRP, SPR, KOAA. (21 locations).
Page no. 9
COMPARATIVE WINDOW SALE FIGURE ; NAIHATI - GEDE SECTION
PERIOD : APRIL TO DECEMBER
No. STATION PASSENGER PASSENGER EARNINGS
2013-14 2014-15 % Var. 2013-14 2014-15 % Var.
1 Naihati 12996259 12593835 -3.10 87154030 93107123 6.83
2 Halisahar 4881893 5040413 3.25 22667249 24975984 10.19
3 Kanchrapara 7991852 7618925 -4.67 51862586 54612528 5.30
4 Kalyani 5521825 5196707 -5.89 38046480 40198903 5.66
5 Madanpur 3477625 3216815 -7.50 17942018 19453217 8.42
6 Simurali 2865296 2587913 -9.68 14528773 15573690 7.19
7 Palpara 1598354 1490415 -6.75 8536075 9277693 8.69
8 Chakdaha 8099969 7741576 -4.42 52281887 55906349 6.93
9 Payradanga 2763155 2551586 -7.66 15164135 16633745 9.69
10 Ranaghat Jn. 8655018 7832476 -9.50 63085614 66525251 5.46
11 Bankimnagar 161381 170565 5.69 1193525 1279965 7.24
12 Panchberia 121528 128395 5.65 940875 1029960 9.47
13 Aranghata 2005344 1626810 -18.88 12730803 13525806 6.24
14 Bahirgachhi 258999 254287 -1.82 2174365 2257620 3.83
15 Shantinagar Halt 0 5760 0 47200
16 Bhayna 264700 292800 10.62 2517075 2850730 13.26
17 Bagula 2678814 2239468 -16.40 19823495 21679562 9.36
18 Mayurhat 189600 178365 -5.93 1943550 2135710 9.89
19 Taraknagar 232313 235288 1.28 2536290 2905080 14.54
20 Majdia 1749044 1562931 -10.64 16003720 18939331 18.34
21 Banpur 458867 323750 -29.45 3175590 3444890 8.48
22 Harishnagar 59985 59065 -1.53 513540 536160 4.40
23 Gede 211231 165455 -20.72 1556198 2317900 48.95
TOTAL 67243052 63113600 -6.14 469214397 469214397 7.52
Page no. 10
COMPARATIVE WINDOW SALE FIGURE ; NAIHATI - GEDE SECTION
AVERAGE PER DAY
No. STATION PASSENGER PASSENGER EARNINGS
2013-14 2014-15 % Var. 2013-14 2014-15 % Var.
1 Naihati 47259 45796 -3.10 316924 338571 6.83
2 Halisahar 17752 18329 3.25 82426 90822 10.19
3 Kanchrapara 29061 27705 -4.67 188591 198591 5.30
4 Kalyani 20079 18897 -5.89 138351 146178 5.66
5 Madanpur 12646 11698 -7.50 65244 70739 8.42
6 Simurali 10419 9411 -9.68 52832 56632 7.19
7 Palpara 5812 5420 -6.75 31040 33737 8.69
8 Chakdaha 29454 28151 -4.42 190116 203296 6.93
9 Payradanga 10048 9278 -7.66 55142 60486 9.69
10 Ranaghat Jn. 31473 28482 -9.50 229402 241910 5.45
11 Bankimnagar 587 620 5.69 4340 4654 7.24
12 Panchberia 442 467 5.65 3421 3745 9.47
13 Aranghata 7292 5916 -18.88 46294 49185 6.24
14 Bahirgachhi 942 925 -1.82 7907 8210 3.83
15 Shantinagar Halt 0 21 0 172
16 Bhayna 963 1065 10.62 9153 10366 13.26
17 Bagula 9741 8144 -16.40 72085 78835 9.36
18 Mayurhat 689 649 -5.93 7067 7766 9.89
19 Taraknagar 845 856 1.28 9223 10564 14.54
20 Majdia 6360 5683 -10.64 58195 68870 18.34
21 Banpur 1669 1177 -29.45 11548 12527 8.48
22 Harishnagar 218 215 -1.53 1867 1950 4.40
23 Gede 768 609 -20.72 5659 8429 48.95
TOTAL 244519 229514 -6.13 1586827 1706235 7.52
Page no. 11
II) ASSISTANCE REQUIRED:
SL Items Remarks
1. Service Tax has not been paid by FCI Authority since its introduction on 01.10.2012. Several meetings from divisional level and several demand notices were issued to FCI authority, but to no effect. An amount of Rs.35.308 Lakhs is being as on 30.06.14. On 12.03.2014 a meeting was also held in FCI Zonal Office. HQ may please intervene.
GM/FCI is being regularly requested to pay outstanding including Service Tax, reminder issued on 22.09.14
2. Against accrual of Rs. 1.82 Crores D/C on account of FCI at KYI during June/13, Rs.44.60 Lakhs has been referred to HQ. Decision of waiver appeal submitted by FCI may please be expedited.
The file is being put up to GM through CCM and awaiting GM’s decision.
3. More than 70 out of 312 Epson make UTS ticket printers within warranty period lying defective at different stations and are not getting attended by the firm on the plea that same brand cartridge & ribbon are not being used. The matter may be taken up with the firm as the condition of PO does not support the contention of the firm.
Page no. 12
III) ISSUES RAISED BY PASSENGER ASSOCIATIONS:
COMPARATIVE POSITION OF PUBLIC COMPLAINTS (CAUSE-WISE) OF NAIHATI - GEDE SECTION FOR THE YEAR 2014 – 2015
(UP TO DECEMBER)
SL NO
CAUSES YEAR
2013-14 2014-15
1 IMPROPER BEHAVIOUR OF COMML STAFF
- -
2 IMPROPER BEHAVIOUR OF STAFF OTHER THAN COMML
- -
3 IMPROPER BEHAVIOUR OF STAFF (NON-RLY)
- -
4 BOOKING 3 7
5 RESERVATION 1 5
6 ALLOTMENT OF SEATS BY TRAIN STAFF
- -
7 REFUND OF TICKETS - -
8 UNAUTHORISED PASS. IN COACHES
- -
9 BOOKING & CARRIAGE OF LUGG/PARCEL
1 -
10 ENQUIRY OFFICES - -
11 NON AVAILIBILITY OF WATER - -
12 CATERING & VENDING SERVICES - -
13 CLEANLINESS AT STN - -
14 MAINTENANCE OF COACHES - -
15 ELEC. EQUIPMENTS - 1
16 PUNCTUALITY OF TRAINS 1 7
17 COMPLAINTS RELATING TO SL CLASS
- -
18 THEFT& PILFERAGE - -
19 BRIBERY & CORRUPTION 1 -
20 BED ROLLS - -
21 MISC. CAUSES 2 5
Page no. 13
SL NO
CAUSES YEAR
2013-14 2014-15
22 GRAND TOTAL 9 25
Demands Received from Pass. Associations
(NAIHATI - GEDE section)
SL
No.
DEMAND REMARKS
01 Sri Pradhir Ranjan Dasgupta,
President, Federation of Sealdah
Main Line Passenger Association
HALISAHAR - for extra PF Shed &
extra local train in evening time
Total 560 Sq.m. PF shelter is
available against minimum
requirement of 400 Sq.m.
Total 76 Up and 75 Down trains
stop at Halisahar. Sectional capacity
in Sealdah – Kankurgachi section
and Naihati – Kalyani section is
103.9% and 114.4% respectively.
However one Krishnanagar local is
being proposed leaving Sealdah at
22.20 hrs having stoppage at
Halisahar. No terminal facility is
available at Halisahar to originate a
train.
02 Chakdah Passenger Association
CHAKDAH – for 2nd Foot Over Bridge
at CDH
One FOB exist connecting both side
PF and entry to Station against
minimum requirement of one.
03 Sri Ramesh Ch. Biswas, Ex G.S.
Bagula Srikrishna College & others
BAGULA – for extra Local Train,
First Passenger Train (Gallop), extra
booking counter and Rail gate.
Total 4500 tickets are issued in 5
shifts i.e. average 900 tickets/shift,
which is less than yardstick of
1000.
18 pair trains ply in Ranaghat –
Gede section having stoppage at
Bagula. Sectional capacity though
59% in Ranaghat-Gede section, at
present no spare rake is available at
Ranaghat carshed, further train
may be planned after rake
augmentation at Ranaghat carshed.
Page no. 14
Other issues likely to be raised(as per intelligence report)
Intelligence inputs indicates that the following memorandum may be submitted before GM/ER during annual inspection of Kalyani- Ranaghat-Gede section scheduled to be
held of 22/23.01.2015 Station Memorandum submitted
by Memorandum in connection with
Remarks
Ranaghat Sri Probodh Ranjan Banerjee Secretary, Ranaghat Nagarik Adhikar Suraksha Samity and Sri Partha Patim Chatterjee, MLA cum-Chairman (TMC) of Ranaghat Municipality
The underpass for which work is going on from East to West Ranaghat should be made for passing of Ambulance/vehicles instead of pathway.
The sanction of sub-way is for passengers. There is no land available in approach to provide adequate gradient for vehicle movement. Hence not possible. Already intimated, letter dt.22-10-14 & 08-12-14.
Bahirgachi Sri Kalipada Singha, President Bahirgachi Matua Sangha with villagers of Bahirgachi Madhyapara and Purbapara Nagorik Committee.
Level Crossing gate should be made in between Aranghata and Bahirgachi railway station at Km no. 28/25-26 near Bahirgachi Halt. Railway station.
There is no Km 28/25-26 mear Bahirgachi. Feasibility will be checked for new L.C. gate near Bahirgachi.
Shantinagar Halt
Smt. Ratna Tarafder, Panchyat Member of Shanti Nagar Gram Panchayat (TMC) and Sri Amal Sarkar, Member Shanti Nagar Unnayan Committee
All UP/DN local trains of Ranaghat-Gede section should be given stoppage at Shantinagar Halt Railway station.
Average passenger per day is 25 and earning is Rs.200/-. Further stoppage will be planned gradually with increase of no. of passengers.
Gede Sri Dinu Mahalder, Member of Foreign money exchanger/Gede
Ladies and Gents toilet/bathroom for foreigners who are coming and going through pathway from Gede railway station should be made at outside of Gede railway station.
For International passengers at Gede stn. There is sufficient facility for toilets, urinals and baths in the area provided for them. For other passengers there is provision of one Pay & Use toilet at PF.1 whose patronization is very very poor. There is no feasibility of providing Pay & Use toilet outside the station premises. No facility is required outside station area which will be prone to misuse.
Gede Sri Yogender Kumar, License porter of Gede railway station
Provision of rest room for license porters of Gede
At Gede station 9 nos. of Licensed Porters have been provided for
Page no. 15
should be made adjacent to Gede railway station.
assistance of passengers. As per laid down yardstick, Rest Room for Licence Porters is provided where strength of licence Porter is more than 50.
Kalyani Sri Nripen Chatterjee, Vice President/TMC/Nadia District
Outside foot over Bridge from East side to west side communication of railway passengers.
Immediate opening of New Booking Counter no. 4 ( Adjacent to Kalynai Cinema).
Cleanliness of Kalynai station PFs area etc.
L.C.gates 41 & 42 are available for crossing all railway tracks. Kalyani station having so many PFs cannot be connected through a single bridge. At present average 7300 tickets are being issued daily by operating 09 counters throughout the day in two booking offices. In view of no. of tickets, there is no justification for opening of additional counter. Moreover, the division is facing severe staff constraints. Opening of new booking office will be considered after increase of no. of tickets issued as well as improvement of staff position. Work is getting done by Contractor through a quotation. Regular contract is under finalisation.
Ranaghat Sri Rajat Bose, Secretaty, ERMC/KNJ Branch
Suitable action should be taken immediately against Sri Swapan Kumar Dutt, SSE/P.Way/BQG for mis-behaving/unnecessary harassment against his femal staff Miss Rasesory Halder, working under SSE/P-Way/BQG etc.
Enquiry conducted. The allegation could not be substantiated.
Page no. 16
DIVISIONAL INFORMATION:
� Sealdah division is predominantly a coaching division and serves more than
18.84 Lakhs commuters per day from 206 railway stations (including Block, Flag and Halt stations) through EMU, passenger and Mail/Express trains.
� Sealdah station with coaching terminal in the heart of the metropolis is connecting Northern and Southern West Bengal. Sealdah station with its 13 platforms in the north and 6 platforms in the south along with its vast circulating area, new and old station building, spacious concourse and car parking space, computerized booking and reservation counter, food outlets etc serves more than one million passengers per day. It is the pride of Eastern Railway.
� Ballygunge Jn, Sonarpur Jn, Baruipur Jn in the south and Dum Dum Jn, Naihati Jn, Kalyani Jn, Ranaghat Jn, Barasat Jn and Bongaon Jn in the northern province provide conduit for vast network of tracks to major populace in the area south of the River Ganges upto the coast of Bay of Bengal on the eastern side.
� Computerized Ticket Booking Counter :- Unreserved Ticketing System (UTS) is provided at 146 Stations for issuing tickets to the commuters.
� P R S :- 86 locations are operating over Sealdah Division for providing reserved accommodation to commuters in different long distance trains. This apart, 1 Mobile Ticketing Vans are also pressed into service.
� Infrastructure for Inter – dominion traffic :- The railway path connecting India and Bangladesh passes through two locations over Sealdah division. Maitree Express ferries passengers between the two neighboring counters through Gede and freight trains operate through Gede and Bongaon.
� Advanced Passenger Information System :- NTES, IVRS, Train Indication Board, Digital Announcement System etc. are functioning over Sealdah and other important stations.
� Novel Ticket Checking System :- Ticket checking system is made effective by use of special train locally christened as “Chetna”. Ticket checking has been made effective by commercial department through effective deployment of ticket checking staff and RPF. DRM, ADRMs and other Officers participate in Ticket Checking. The introduction of “Chetna” has raised conscience among ticketless travelers.
� Agglomeration of Nodal Goods Sheds terminals of sufficient capacity :- Chitpur area situated on the northern part of Kolkata with two goods establishments at Chitpur and Cossipore having infrastructural facility of godown, plots, line capacity, yard etc facilitates handling of food grains, onion, cement, sugar etc. Other major goods handling points are Budge Budge, New Alipore, Ballygunge, Barasat, Habra, Bongaon, Belghoria, Titagarh, Naihati, Kalyani, Krishnanagar, Halisahar, Berhampore Court and Cossimbazar serve major populace of Southern West Bengal.
Page no. 17
� Unauthorized Encroachment : Movement of trains and commuters within station premises have been affected due to unauthorized encroachment of railway land, station premises and platforms in certain sections. The encroachment has taken a socio-political shape over Sealdah division.
� Multiple exit and Insufficient Fencing : Due to absence of fencing, multiple entry/exit points exist at many stations due to local passenger demand. These gaps provide easy and free movement of ticket less passengers.
� Limited Outward Loading : Due to lack of industries, goods loading are confined to movement of Food-grains, vegetable oil, jute and container services. Limited industrial centers offer scarce train load traffic.
Organizational Structure
Sr.DCM C.R.Jha
DCM K.D.Das
ACM/TC R.Ranjan
ACM/CP B.Toppo
ACM/I A.Mukherjee
Page no. 18
Station : GEDE Category : C
1. POSITION OF PASSENGER AMENITY ITEMS
S.No. Item Available
1
Platforms
PF No.1 - 301 m PF No. 2 – 321 m
2 Booking Counter(s) 4
3 Shelter
Shade(sqm.) 630
Waiting Hall(Sq. m) 56.76
Tree(s) 7
4 Drinking Water
Taps 18
Hand Pump(s) 3
Water hut/Trolleys 0
Water Cooler 3
5 Seats 215
6 Lavatory 4
7 Urinals 12
8 Lights 194
9 Fans 18
10 F O B(s) 1
11 Waiting Hall (Sq. m) 56.76
12 Waiting Hall (Ladies) (Sq. m) --
13 P A System Available
14 Clock Available
15 Time Table Available
16 ATVM --
17 ATM --
2. PAY AND USE COMPLEX : Terminated on 16.12.13
3. BOOK STALL : --
4. VENDING STALL : --
5. B.O
S
Morning- 1
Evening- 1
Night- 1
6. STAFF POSITION :-
BS Ch.CC HBC Sr.CC CC Total
Counter in operation
Shift
Booking 1 1 2 4 1 3
7. WINDOW SALE FIGURE:
UTS Average Earnings / Day Rs. 8,429/-
Average No. of Passenger / Day 609
Page no. 19
Station : HARISHNAGAR HALT Category : F Halt Contractor – Sri Dipak Biswas
Feeding Station – Banpur
1. POSITION OF PASSENGER AMENITY ITEMS
No.
Item Available
1 Platforms
PF No.1 - 272 m PF No.2 – 272 m
2 Booking Counter(s) 2
3 Shelter
Shade(sqm.) --
Waiting Hall(Sq. m) 9.29
Tree(s) 5
4 Drinking Water
Taps 0
Hand Pump(s) 2
Water hut/Trolleys 0
Water Cooler 0
5 Seats --
6 Lavatory 2
7 Urinals 1
8 Lights 21
9 Fans 0
10 F O B(s) --
11 Waiting Hall (Sq. m) 9.29
12 Waiting Hall (Ladies) (Sq. m) --
13 P A System --
14 Clock Available
15 Time Table Available
16 ATVM --
17 ATM --
2. PAY AND USE COMPLEX : --
3. BOOK STALL : --
4. VENDING STALL : --
5. B.O Shift : : By Halt Contractor
6. STAFF POSITION :- Halt Contractor
7. WINDOW SALE FIGURE:
UTS Average Earnings / Day Rs. 1,950/-
Average No. of Passenger / Day 215
Page no. 20
Station : BANPUR Category : C
1. POSITION OF PASSENGER AMENITY ITEMS
No.
Item Available
1 Platforms
PF No.1 - 300 m PF No. 2 – 300 m
2 Booking Counter(s) 4
3 Shelter
Shade(sqm.) 132
Waiting Hall(Sq. m) 56
Tree(s) 12
4 Drinking Water
Taps 18
Hand Pump(s) 4
Water hut/Trolleys 0
Water Cooler 0
5 Seats 115
6 Lavatory 4
7 Urinals 10
8 Lights 46
9 Fans 4
10 F O B(s) 1
11 Waiting Hall (Sq. m) 56
12 Waiting Hall (Ladies) (Sq. m) --
13 P A System Available
14 Clock Available
15 Time Table Available
16 ATVM --
17 ATM --
2. PAY AND USE COMPLEX : --
3. BOOK STALL : --
4. VENDING STALL : --
5. B.O
S
Morning- 1
Evening- 1
Night- 1
6. STAFF POSITION :-
BS HBC CC Total
Counter in operation
Shift
Booking 1 1 2 4 1 3
7. WINDOW SALE FIGURE:
UTS Average Earnings / Day Rs. 12,527/-
Page no. 21
Average No. of Passenger / Day 1,177
Station : MAJHDIA Category : C
1. POSITION OF PASSENGER AMENITY ITEMS
No.
Item Available
1 Platforms
PF No.1 - 305 m PF No. 2 – 305 m
2 Booking Counter(s) 2
3 Shelter
Shade(sqm.) 525
Waiting Hall(Sq. m) 48.91
Tree(s) 0
4 Drinking Water
Taps 18
Hand Pump(s) 3
Water hut/Trolleys 0
Water Cooler 0
5 Seats 205
6 Lavatory 2
7 Urinals 11
8 Lights 50
9 Fans 13
10 F O B(s) 1
11 Waiting Hall (Sq. m) 48.91
12 Waiting Hall (Ladies) (Sq. m) --
13 P A System Available
14 Clock Available
15 Time Table Available
16 ATVM --
17 ATM --
2. PAY AND USE COMPLEX : --
3. BOOK STALL : --
4. VENDING STALL : --
5. B.O Shift: Morning- 2 (Luggage counter At morning-1)
Evening- 2
Night- 1
Counter no. 2 running as UTS cum PRS w.e.f.15.05.14
6. STAFF POSITION :-
BS Ch.CC HBC Sr.CC CC Total
Counter in operation
Shift
Booking 1 2 3 6 2 6
7. WINDOW SALE FIGURE:
Page no. 22
UTS Average Earnings / Day Rs. 68,870/-
Average No. of Passenger / Day 5,683
Station : TARAKNAGAR HALT Category : F Halt Contractor – Sri Dasarath Mondal
Feeding Station – Bagula
1. POSITION OF PASSENGER AMENITY ITEMS
No.
Item Available
1 Platforms
PF No.1 - 270 m PF No.2 – 270 m
2 Booking Counter(s) 2
3 Shelter
Shade(sqm.) 180
Waiting Hall(Sq. m) 25
Tree(s) 14
4 Drinking Water
Taps 2
Hand Pump(s) 2
Water hut/Trolleys 0
Water Cooler 0
5 Seats 30
6 Lavatory 2
7 Urinals 2
8 Lights 26
9 Fans 1
10 F O B(s) --
11 Waiting Hall (Sq. m) 25
12 Waiting Hall (Ladies) (Sq. m) --
13 P A System --
14 Clock Available
15 Time Table Available
16 ATVM --
17 ATM --
2. PAY AND USE COMPLEX : --
3. BOOK STALL : --
4. VENDING STALL : --
5. B.O Shift : : By Halt Contractor
6. STAFF POSITION :- Halt Contractor
7. WINDOW SALE FIGURE:
Page no. 23
UTS Average Earnings / Day Rs. 10,564/-
Average No. of Passenger / Day 856
Station : MAYURHAT HALT Category : F Halt Contractor – Sri Durga Prasad Roy
Feeding Station – Bagula
1. POSITION OF PASSENGER AMENITY ITEMS
No.
Item Available
1 Platforms
PF No.1 - 270 m PF No.2 – 270 m
2 Booking Counter(s) 2
3 Shelter
Shade(sqm.) 198
Waiting Hall(Sq. m) 9.29
Tree(s) 11
4 Drinking Water
Taps 0
Hand Pump(s) 3
Water hut/Trolleys 0
Water Cooler 0
5 Seats 55
6 Lavatory 2
7 Urinals 4
8 Lights 26
9 Fans 0
10 F O B(s) --
11 Waiting Hall (Sq. m) 9.29
12 Waiting Hall (Ladies) (Sq. m) --
13 P A System --
14 Clock Available
15 Time Table Available
16 ATVM --
17 ATM --
2. PAY AND USE COMPLEX : --
3. BOOK STALL : --
4. VENDING STALL : --
5. B.O Shift : : By Halt Contractor
6. STAFF POSITION :- Halt Contractor
7. WINDOW SALE FIGURE:
Page no. 24
UTS Average Earnings / Day Rs. 7,766/-
Average No. of Passenger / Day 649
Station : BAGULA Category : C
1. POSITION OF PASSENGER AMENITY ITEMS
No.
Item Available
1 Platforms
PF No.1 - 273 m PF No. 2 – 271 m
2 Booking Counter(s) 2
3 Shelter
Shade(sqm.) 433
Waiting Hall(Sq. m) 59.39
Tree(s) 10
4 Drinking Water
Taps 18
Hand Pump(s) 2
Water hut/Trolleys 0
Water Cooler 0
5 Seats 105
6 Lavatory 2
7 Urinals 10
8 Lights 59
9 Fans 11
10 F O B(s) 1
11 Waiting Hall (Sq. m) 59.39
12 Waiting Hall (Ladies) (Sq. m) --
13 P A System Available
14 Clock Available
15 Time Table Available
16 ATVM --
17 ATM --
2. PAY AND USE COMPLEX : --
3. BOOK STALL : --
4. VENDING STALL : --
5. B.O
S
Morning- 2
Evening- 2
Night- 1
6. STAFF POSITION :-
B
Ch.CC HB
Sr.CC CC Total Counter in
operation
Shift
Booking 1 2 2 5 2 5
Page no. 25
7. WINDOW SALE FIGURE:
UTS Average Earnings / Day Rs. 78,835/-
Average No. of Passenger / Day 8,144
Station : BHAYNA HALT Category : F Halt Contractor – Sri Sanjoy Ash
Feeding Station – Aranghata
1. POSITION OF PASSENGER AMENITY ITEMS
No.
Item Available
1 Platforms
PF No.1 - 272 m PF No.2 – 272 m
2 Booking Counter(s) 2
3 Shelter
Shade(sqm.) --
Waiting Hall(Sq. m) 9.29
Tree(s) 25
4 Drinking Water
Taps 0
Hand Pump(s) 3
Water hut/Trolleys 0
Water Cooler 0
5 Seats 60
6 Lavatory 2
7 Urinals 2
8 Lights 25
9 Fans 0
10 F O B(s) 1
11 Waiting Hall (Sq. m) 9.29
12 Waiting Hall (Ladies) (Sq. m) --
13 P A System --
14 Clock Available
15 Time Table Available
2. PAY AND USE COMPLEX : --
3. BOOK STALL : --
4. VENDING STALL : --
5. B.O Shift : : By Halt Contractor
6. STAFF POSITION :- Halt Contractor
Page no. 26
7. WINDOW SALE FIGURE:
UTS Average Earnings / Day Rs. 10,366/-
Average No. of Passenger / Day 1,065
Page no. 27
Station : BAHIRGACHHI HALT Category : F Halt Contractor – Sri Ramendra Nath Roy
Feeding Station – Aranghata
1. POSITION OF PASSENGER AMENITY ITEMS
No.
Item Available
1 Platforms
PF No.1 - 270 m PF No.2 – 270 m
2 Booking Counter(s) 1
3 Shelter
Shade(sqm.) 160
Waiting Hall(Sq. m) 9.29
Tree(s) 12
4 Drinking Water
Taps 0
Hand Pump(s) 3
Water hut/Trolleys 0
Water Cooler 0
5 Seats 42
6 Lavatory 3
7 Urinals 2
8 Lights 25
9 Fans 0
10 F O B(s) 1
11 Waiting Hall (Sq. m) 9.29
12 Waiting Hall (Ladies) (Sq. m) --
13 P A System --
14 Clock Available
15 Time Table Available
16 ATVM --
17 ATM --
2. B.O Shift : : By Halt Contractor
3. STAFF POSITION :- Halt Contractor
4. WINDOW SALE FIGURE:
UTS Average Earnings / Day Rs. 8,210/-
Average No. of Passenger / Day 925
Page no. 28
Station : ARANGHATA Category : C
1. POSITION OF PASSENGER AMENITY ITEMS
No.
Item Available
1 Platforms
PF No.1 - 269 m PF No. 2 – 269 m
2 Booking Counter(s) 2
3 Shelter
Shade(sqm.) 264
Waiting Hall(Sq. m) 131
Tree(s) 3
4 Drinking Water
Taps 18
Hand Pump(s) 4
Water hut/Trolleys 0
Water Cooler 0
5 Seats 131
6 Lavatory 2
7 Urinals 12
8 Lights 45
9 Fans 7
10 F O B(s) 1
11 Waiting Hall (Sq. m) 131
12 Waiting Hall (Ladies) (Sq. m) --
13 P A System Available
14 Clock Available
15 Time Table Available
2. PAY AND USE COMPLEX : Terminated on 16.12.13
3. BOOK STALL : --
4. VENDING STALL : --
5. B.O
S
Morning- 2
Evening- 2
Night- 1
6. STAFF POSITION :-
BS Ch.CC HBC Sr.CC CC Total
Counter in operation
Shift
Booking 1 2 2 5 2 5
7. WINDOW SALE FIGURE:
UTS Average Earnings / Day Rs. 49,185/-
Average No. of Passenger / Day 5,916
Page no. 29
Station : PANCHBERIA HALT Category : F Halt Contractor – Sri Sambhu Nath Das
Feeding Station – Ranaghat
1. POSITION OF PASSENGER AMENITY ITEMS
No.
Item Available
1 Platforms
PF No.1 - 270 m PF No.2 – 270 m
2 Booking Counter(s) 2
3 Shelter
Shade(sqm.) 176
Waiting Hall(Sq. m) 9.29
Tree(s) 2
4 Drinking Water
Taps 0
Hand Pump(s) 2
Water hut/Trolleys 0
Water Cooler 0
5 Seats 14
6 Lavatory 2
7 Urinals 1
8 Lights 27
9 Fans 1
10 F O B(s)
11 Waiting Hall (Sq. m) 9.29
12 Waiting Hall (Ladies) (Sq. m) --
13 P A System --
14 Clock Available
15 Time Table Available
16 ATVM --
17 ATM --
2. B.O Shift : : By Halt Contractor
3. STAFF POSITION : Halt Contractor
4. WINDOW SALE FIGURE:
UTS Average Earnings / Day Rs. 3,745/-
Average No. of Passenger / Day 467
Page no. 30
Station : BANKIMNAGAR HALT Category : F Halt Contractor – Sri Satya Prakash Biswas Feeding Station – Ranaghat
1. POSITION OF PASSENGER AMENITY ITEMS
No.
Item Available
1 Platforms
PF No.1 - 270 m PF No.2 – 270 m
2 Booking Counter(s) 2
3 Shelter
Shade(sqm.) 80
Waiting Hall(Sq. m) 9.29
Tree(s) 7
4 Drinking Water
Taps 0
Hand Pump(s) 2
Water hut/Trolleys 0
Water Cooler 0
5 Seats 26
6 Lavatory 2
7 Urinals 2
8 Lights 24
9 Fans 1
10 F O B(s)
11 Waiting Hall (Sq. m) 9.29
12 Waiting Hall (Ladies) (Sq. m) --
13 P A System --
14 Clock Available
15 Time Table Available
16 ATVM --
17 ATM --
2. B.O Shift : : By Halt Contractor
3. STAFF POSITION :- Halt Contractor
4. WINDOW SALE FIGURE:
UTS Average Earnings / Day Rs. 4,654/-
Average No. of Passenger / Day 620
Page no. 31
Station : RANAGHAT JN Category : C
1. POSITION OF PASSENGER AMENITY ITEMS
No.
Item Available
1 Platforms
PF No.1 - 288 m PF No. 2&3 – 316 m PF No. 5&6 – 291 m PF No. 7 – 272 m
2 Booking Counter(s) 6
3 Shelter
Shade(sqm.) 1710.5
Waiting Hall(Sq. m) 232
Tree(s) 15
4 Drinking Water
Taps 50
Hand Pump(s) 2
Water hut/Trolleys 0
Water Cooler 2
5 Seats 913
6 Lavatory 6
7 Urinals 28
8 Lights 250
9 Fans 42
10 F O B(s) 3
11 Waiting Hall (Sq. m) 232
12 Waiting Hall (Ladies) (Sq. m) --
13 P A System Available
14 Clock Available
15 Time Table Available
16 ATVM --
17 ATM --
2. PAY AND USE COMPLEX : East Krishnanagar Social Welfare Society, C/o Ram Naresh
Jha Old Unit – Paid upto 17.08.15 New Unit – Paid upto 24.01.15 3. BOOK STALL : Rajiv Book Stall, C/o Subhranshu
Sarkar, Paid upto 31.03.15
4. B.O
Shift:
(Main) Morning-2 Genl. (10–18 Hrs.)-1 (NBO/East) Morning-1 (NBO/West) Morning -2
Evening-2 Evening-1 Evening-2
Night-2 Night –x Night-1
Page no. 32
6. STAFF POSITION :-
BS Ch.CC HBC Sr.CC CC Total
Counter in operation
Shift
Booking 1 4 8 7 20 7 15
Parcel 3 3 Round the clock
Goods From Booking 10 Hrs – 18 Hrs.
PRS RS-II- 1, ECRC-4 = 5 (Total)
2 Counter – 3 Shift Morn -2, Eve -1
7. WINDOW SALE FIGURE:
UTS Average Earnings / Day Rs. 2,41,910/-
Average No. of Passenger / Day 28,482
PRS Average No. of Requisition/per counter / shift 100 Average No. of Passenger /per counter / shift 165 Average Earning /per counter / shift Rs. 55,000/-
8. GOODS:
Line Capacity : 42 BCN
Commodity – Bangladesh Traffic (for Customs Checking)
Avg. Rake/month –
9. ATM:
One Counter with two ATMs of State Bank of India. Paid upto 15.01.12.
Additional L/Fee of 1.50 Sq. M. has been deposited by the bank and renewal
of the agreement is under process for early realization of due L/Fee from the
date of expiry of the contract agreement.
Page no. 33
Station : PAYRADANGA Category : C
1. POSITION OF PASSENGER AMENITY ITEMS
No.
Item Available
1 Platforms
PF No.1 - 275 m PF No.2 - 275 m
2 Booking Counter(s) 3
3 Shelter
Shade(sqm.) 448
Waiting Hall(Sq. m) 15.75
Tree(s) 20
4 Drinking Water
Taps 18
Hand Pump(s) 2
Water hut/Trolleys 0
Water Cooler --
5 Seats
152
6 Lavatory 2
7 Urinals 9
8 Lights 51
9 Fans 06
10 F O B(s) 1
11 Waiting Hall (Sq. m) 15.75
12 Waiting Hall (Ladies) (Sq. m) --
13 P A System Available
14 Clock Available
15 Time Table Available
16 ATVM --
17 ATM --
2. PAY AND USE COMPLEX : Maa Tara Construction Paid upto 26.07.15
3. B.O Shift: Morning-2 Evening-2 Night-1
4. STAFF POSITION :-
BS Ch.CC HBC Sr.CC CC Total
Counter in operation
Shift
Booking - 1 - - 8 9 2 5
5. WINDOW SALE FIGURE:
UTS Average Earnings / Day Rs. 60,486/-
Average No. of Passenger / Day 9,278
Page no. 34
Station : CHAKDAH Category : C
1. POSITION OF PASSENGER AMENITY ITEMS
No.
Item Available
1 Platforms
PF No.1 - 350 m PF No.2 - 350 m
2 Booking Counter(s) 7
3 Shelter
Shade(sqm.) 656
Waiting Hall(Sq. m) 97
Tree(s) 07
4 Drinking Water
Taps 12
Hand Pump(s) 2
Water hut/Trolleys 0
Water Cooler --
5 Seats 365
6 Lavatory 18
7 Urinals 21
8 Lights 83
9 Fans 10
10 F O B(s) 1
11 Waiting Hall (Sq. m) 97
12 Waiting Hall (Ladies) (Sq. m) 40
13 P A System Available
14 Clock Available
15 Time Table Available
2. PAY AND USE COMPLEX : Rani Enterprise, Sri Gajendra Kr. Singh , Rahuta Rd,
Shyamnagar Paid upto 31.08.15
3. B.O Shift: Main Morning-2
NBO Morning-2
Evening-2
Evening-2
Night-2
4. STAFF POSITION :-
BS Ch.CC HBC Sr.CC CC Total
Counter in operation
Shift
Booking 1 5 5 4 15 4 10
PRS ECRC-1 1 1
5. WINDOW SALE FIGURE:
UTS Average Earnings / Day Rs. 2,03,296/-
Average No. of Passenger / Day 28,151 PRS Average No. of Requisition / Day 140
Page no. 35
Average No. of Passenger / Day 197 Average Earning / Day Rs. 75,000/-
Station : PALPARA Category : C
1. POSITION OF PASSENGER AMENITY ITEMS
No.
Item Available
1 Platforms
PF No.1&2 - 276 m
2 Booking Counter(s) 1
3 Shelter
Shade(sqm.) 288
Waiting Hall(Sq. m) 26
Tree(s) 06
4 Drinking Water
Taps 18
Hand Pump(s) 2
Water hut/Trolleys 0
Water Cooler --
5 Seats
164
6 Lavatory 8
7 Urinals 14
8 Lights 39
9 Fans 6
10 F O B(s) -
11 Waiting Hall (Sq. m) 26
12 Waiting Hall (Ladies) (Sq. m) 40
13 P A System Available
14 Clock Available
15 Time Table Available
2. PAY AND USE COMPLEX : Maa Tara Construction Paid upto 26.07.15
3. B.O Shift: Morning-1 Evening-1 Night-1
4. STAFF POSITION :-
BS Ch.CC HBC Sr.CC CC Total
Counter in operation
Shift
Booking 1 1 - 4 6 1 3
5. WINDOW SALE FIGURE:
Page no. 36
UTS Average Earnings / Day Rs. 33,737/-
Average No. of Passenger / Day 5,420
Station : SIMURALI Category : C
1. POSITION OF PASSENGER AMENITY ITEMS
No.
Item Available
1 Platforms
PF No.1 - 305 m PF No. 2 – 305 m
2 Booking Counter(s) 3
3 Shelter
Shade(sqm.) 560
Waiting Hall(Sq. m) 34
Tree(s) 04
4 Drinking Water
Taps 18
Hand Pump(s) 2
Water hut/Trolleys 0
Water Cooler --
5 Seats
254
6 Lavatory 11
7 Urinals 15
8 Lights 57
9 Fans 14
10 F O B(s) 1
11 Waiting Hall (Sq. m) 34
12 Waiting Hall (Ladies) (Sq. m) 40
13 P A System Available
14 Clock Available
15 Time Table Available
2. PAY AND USE COMPLEX : M/s Speed Con, Sri Parimal Ch. Sarkar, Paid upto
31.03.15 3. VENDING STALL : P. C. Guha Roy, Subjudice
4. B.O Shift: Morning-2 Evening-2 Night-1
5. STAFF POSITION :-
BS Ch.CC Sr.CC CC Total
Counter in operation
Shift
Booking 1 1 1 4 7 2 5
Page no. 37
6. WINDOW SALE FIGURE:
UTS Average Earnings / Day Rs. 56,632/-
Average No. of Passenger / Day 9,411
Station : MADANPUR Category : C
1. POSITION OF PASSENGER AMENITY ITEMS
No.
Item Available
1 Platforms
PF No.1 - 276 m PF No. 2 – 276 m
2 Booking Counter(s) 5
3 Shelter
Shade(sqm.) 560
Waiting Hall(Sq. m) 138
Tree(s) 08
4 Drinking Water
Taps 12
Hand Pump(s) 2
Water hut/Trolleys 0
Water Cooler --
5 Seats
371
6 Lavatory 8
7 Urinals 11
8 Lights 59
9 Fans 15
10 F O B(s) 1
11 Waiting Hall (Sq. m) 138
12 Waiting Hall (Ladies) (Sq. m) 48
13 P A System Available
14 Clock Available
15 Time Table Available
16 ATVM --
17 ATM --
2. PAY AND USE COMPLEX : M/s Speed Con, Sri Parimal Ch. Sarkar, Paid upto
25.09.14 Demand notice issued for next payment 3. Vending Stall : Shankar Ram Hela & Sons
4. B.O Shift: Morning-2 Evening-2 Night-1
5. STAFF POSITION :-
BS Ch.CC Sr.CC CC Total
Counter in operation
Shift
Booking 1 1 2 4 8 2 5
Page no. 38
6. WINDOW SALE FIGURE:
UTS Average Earnings / Day Rs. 70,739/-
Average No. of Passenger / Day 11,698 Station : KALYANI
Category : C
1. POSITION OF PASSENGER AMENITY ITEMS
No.
Item Available
1 Platforms
PF No.1 - 305 m PF No. 2&3 – 305 m PF No. 4 – 276 m
2 Booking Counter(s) 10
3 Shelter
Shade(sqm.) 1552
Waiting Hall(Sq. m) 50
Tree(s) 12
4 Drinking Water
Taps 25
Hand Pump(s) 0
Water hut/Trolleys 0
Water Cooler 1
5 Seats
740
6 Lavatory 7
7 Urinals 29
8 Lights 302
9 Fans 82
10 F O B(s) 2
Width 3.5m & 1.8m
11 Waiting Hall (Sq. m) 50
12 Waiting Hall (Ladies) (Sq. m) 30
13 P A System Available
14 Clock Available
15 Time Table Available
16 ATVM --
17 ATM 01 (SBI)
2. PAY AND USE COMPLEX : Run Departmentally
3. BOOK STALL : Palash Saha, Demand notice served
4. TEA STALL : 02
5. B.O Shift: (Main) Morning-2
(NBO) Morning-1
Evening-2
Evening-1
Night-1 (Genl-1)
Night-1
6. STAFF POSITION :-
BS Ch.CC Sr.CC CC Total Counter in Shift
Page no. 39
operation
Booking 1 3 8 2 14 4 9
Goods 1 1 2 Siding
PRS RS-II - 02, ECRC- 01 1 Counter – 2 Shift
7. WINDOW SALE FIGURE:
UTS Average Earnings / Day Rs. 1,46,178/-
Average No. of Passenger / Day 18,897
PRS Average No. of Requisition / shift 110 Average No. of Passenger / shift 170 Average Earning / shift Rs. 70,000/-
8. GOODS:
Line Capacity (FCI Siding) : 3 rakes (138 wagons)
Commodity – Food Grains
Avg. Inward rake – 09 rake/ month
9. ATM:
One Counter of State Bank of India. Paid upto 15.01.12. Additional L/Fee of
1.50 Sq. M. has been deposited by the bank and renewal of the agreement is
under process for early realization of due L/Fee from the date of expiry of the
contract agreement.
Page no. 40
Station : KANCHRAPARA CATEGORY - C
1. POSITION OF PASSENGER AMENITY ITEMS
No. Item
Available
1 Platform Level H/L 350 m
No. of PF-3, PF No.2 & 3 island
2 Booking Counter(s) 9
3. Shelter
Shade(sqm.) 1614
Waiting Hall(sqm.) 67
Tree(s) 16
4. Drinking Water
Taps 28
Hand Pump(s) 1
Water hut/Trolleys
Water Cooler 1
5 Seats 648
6 Lavatory 5
7 Urinals 21
8 Lights 167
9 Fans 44
10 F O B(s) 2
11 Waiting Hall (Sq. m) 67
12 P A System Available
13. Clock Available
14. Time Table Available
15. TIB Available
2. PAY AND USE COMPLEX : M/s Speedcon, Prop. Sri Parimal Ch. Sarkar, Paid upto 18.09.14 3. FLOWER STALL : M/s Arun Bhattacharjee, paid upto Dec/14
4. No. of Advance Resvn. Window : 1
5. B.O Shift: (Main) Morning-3 (NBO) Morning-1
Evening-3 Evening -1 (Sat & Sun Genl
10-16 hrs.)
Night-2 Parcel- 10-16 hrs.
6. PRS Shift: 08 hrs to 14 hrs. & 14: 00 hrs to 20:00 hrs(Sunday
7. STAFF POSITION :-
BS CCC Sr.CC Total Counter Shift
1 7 9 17 4 10
ECRC 2 1 2
8. Window Sale Figure
UTS Average Earnings Per Day Rs.1,98,591/-
Average Passengers Per day 27,705
Page no. 41
PRS
Average Earnings Per/shift Rs.75,000.00
Average Requisition Per/shift 120 Average Passenger Per/shift 280
Station : HALISAHAR Category : C
1. POSITION OF PASSENGER AMENITY ITEMS
No. Item
Available
1 Platform Level H/L
No. of PF-2, 275 m.
2 Booking Counter(s) 5
3. Shelter
Shade(sqm.) 560
Waiting Hall(sqm.) 54
Tree(s) 2
4. Drinking Water
Taps 12
Hand Pump(s) 2
Water hut/Trolleys
Water Cooler 1
5 Seats 584
6 Lavatory 9
7 Urinals 21
8 Lights 68
9 Fans 17
10 F O B(s) 1
11 Waiting Hall (Sq. m) 54
12 P A System Available
13. Clock Available
14. Time Table Available
15. TIB Available
2. BOOK STALL : Sri Kalyanmoy Banerjee Paid upto 28.02.2015
3. VENDING STALL : M/s Sukumar Sarkar Paid upto Jan/15
4. B.O Shift: Morning-3 Evening-2 Night-1
5. STAFF POSITION :-
BS Sr.CC CC HBC Total Counter In op.
Shift
1 6 1 1 9 10
3 6
6. Window Sale Figure
UTS Average Earnings Per Day Rs.90,822/-
Average Passengers Per day 18,329
Page no. 42
Station : NAIHATI Category : A
1. POSITION OF PASSENGER AMENITY ITEMS
No.
Item Available
1 Platforms
PF No.1 - 276.6 m PF No. 2&3 – 603 m PF No. 4&5 – 351 m
2 Booking Counter(s) 7
3 Shelter
Shade(sqm.) 3278
Waiting Hall(Sq. m) 186
Tree(s) 25
4 Drinking Water
Taps 72
Hand Pump(s) -
Water hut/Trolleys 0
Water Cooler 1
5 Seats 901
6 Lavatory 7
7 Urinals 30
8 Lights 311
9 Fans 72
10 F O B(s) 2
Width 3.7m & 1.8m
11 Waiting Hall (Sq. m) 186
12 Waiting Hall (Ladies) (Sq. m) 30
13 P A System Available
14 Clock Available
15 Time Table Available
16 ATVM 02
17 ATM 01 (SBI)
2. PAY AND USE COMPLEX : M/s Speedcon, Prop. Sri Parimal Ch. Sarkar, Paid upto
18.09.14 3. BOOK STALL : Rashtriya Sahitya Mandir
Paid upto 2010, Demand notice served.
4. VENDING STALL : Nil
5. B.O Shift: (Main) Morning-5
(NBO) Morning-2
Evening-5
Evening-1
Night-3
Page no. 43
6. STAFF POSITION :-
BS Ch.CC HBC Sr.CC CC Total
Counter in operation
Shift
Booking 3 6 8 7 24 7 16
Parcel 2 2 4 Round the clock
Goods 3 2 1 6 6 Hrs – 22 Hrs.
PRS RS-II - 03 1 Counter – 2 Shift
7. WINDOW SALE FIGURE:
UTS Average Earnings / Day Rs. 3,38,571/-
Average No. of Passenger / Day 45,796
ATVM
Avg no. Smart Card sale/ day 01 Avg. no. Ticket/ day 75 Avg. no. of Passenger /day 160 Avg. Earning / Day Rs. 1,240/-
PRS Average No. of Requisition / shift 110 Average No. of Passenger / shift 160 Average Earning / shift Rs. 50,000/-
8. JTBS:
M/s Atithi (Near Naihati SBI)
Avg. Pass per day – 90 Avg. Earn. Per day - Rs. 650/-
9. GOODS:
Line Capacity : DL/2 – 3, C/Shed – 2, L/6 – 10
Commodity – Gunny Bales
Avg. Outward Loading/month – 162 Wagons.
Avg. Outward Earning/month - Rs. 2.06 Crore.
Avg. Weighment of rake/month – 01
10. ATM:
One Counter with two ATMs of State Bank of India. Paid upto 15.01.12.
Additional L/Fee of 1.50 Sq. M. has been deposited by the bank and renewal
of the agreement is under process for early realization of due L/Fee from the
date of expiry of the contract agreement.
Page no. 44
ELECTRICAL/TRS
I) PERFORMANCE: Punctuality performance analysis 2013-14 & 2014-15 (Up to Dec.)
*23 nos EMU loss on account of loco failure during 2014-15 (upto dec14) &
30 nos EMU loss on account of loco failure during 2013-14(upto dec13)
** Punctuality loss of Mail/Express due to EMU/MEMU failure/trouble is Nil
Comparison line failure (Asset Failure) analysis 2013-14 & 2014-15(Up to Dec.)
Failure Reason 2013-14
[April- Dec] 2014-15
[April-Dec]
Electrical -- --
Mechanical 1 1
Pneumatic 1 1
Traction Motor -- --
Total 2 2
Page no. 45
Target and Achievement of TRS Maintenance
Sl No
Item Target
Status 2013-14 (
upto Dec13)
Status 2014-15 (
upto Dec14) Remarks
1 KM .Run per failure
20 lac 18.15 lac 26.8 lac
No of cases 42 of 11281005 KM during 2014-15
2 No of defect per 100 coaches
03 2.95 1.68 -
3 Hot Axle cases Nil 01 NIL -
4 Scrap disposal Ferrous Non Ferrous
220MT 5MT
217.4917MT
4.894MT
159.512MT 5.662MT
-
5 Avg. Ineffective Percentage
11.5 14.37 11.59 -
6 12 car formation as per budget announcement
All 9/10-Car
34 40
Remaining to be
augmented 64
7 UST over due Nil NIL NIL -
8 Overdue Inspection
NIL NIL NIL -
9 POH Overdue Coaches
NIL
M/C-43 T/C- 126
M/C-30 T/C- 95
As on 07.1.15
Out of 95 nos T/C 33 nos are out of service waiting for POH
10 Asset failure Nil 02 02 -
11 Traction Motor bearing seizer on line
Nil 01 01 -
12 No. of train cancellation on EMU account
01 01(1 Case) 12 (6 cases) -
13
Line failure (Causing punctuality loss of trains)
Nil 178 78
Reduces 56.17 %from
Previous year (178 case up to
Dec )
14 Punctuality loss of Mail/Express due to EMU/MEMU
Nil Nil Nil
Page no. 46
failure/trouble.
Target and Achievement of TRS /SDAH
(TRS-Operation). Implementation of 10 Hrs. Rule
Div. Sign on-Sign off (%) Achieved Up to Dec
2014
Departure-Arrival (%) AchievedUp to Dec14
2013-14
(upto Dec 13)
Target 2014-15
2013-14 (upto Dec
13)
Target 2014-15
SDAH 80.87 85.0 82.13 94.38 100.0 95.89
Overtime to Running Staff:
Division Overtime during 2013-14 (hours)
Target 2014-15 Achieve Up to Dec14
SDAH Nil Nil NIL
Other Targets:
Sl no
Item 2013-14 (upto Dec 13)
Target 2014-15
2014-15 Up to Dec 14
Remarks
1 SPAD CASES
04 NIL 01
2 Stalling Cases
NIL To be reduced by 5%
Nil
3
Preparation of OT/ Mileage of Coaching and Goods loco staff through CMS
80% 100% 80.14%
4
Preparation of OT/ Mileage of EMU staff through CMS
- Software to be developed by CRIS
EMU-NIL
Being done through Bio metric based Sign safe system
5 Asset Failure on territorial basis
SDAH Div.-12
SDAH Div.-15 HWH Div.-20 ASN Div.-27
06
6 Loss of punctuality cases (no. of incidents)
SDAH Div.-3
SDAH Div.-7 HWH Div.-23 ASN Div.-43
07
Page no. 47
II) ASSISTANCE REQUIRED:
Ranaghat Car shed:
• Creation of 04 posts of Shunt man to enable EMU/MEMU shuting from BNJ end of RHA carshed. Matching Surrender of 4 call men was given vide Surrender memorandum no EW/MPP/WS/Elect TRS/E-22 date 31.03.2014. Proposal for creation of 4 posts of shunt man has been submitted from DRM/SDAH to HQ vide L/no EW/MPP/WS/TRS/E-22 dated 23-07-2014.
• Holding of carshed has already reached 15 rakes and in view of doubling under progress between RHA to LGL section, it is likely to double in next 2 years. Hence additional inspection bays are needed. Proposal for construction of additional inspection bays with shed at line no 6 & 7 at a cost of Rs 208345(in Rs thousand) has already been given by Sr DEN(CO)/SDAH under PH-42 in IRPSM dated 11-06-2014.
Posting of fulltime AMM at TRS/SDAH:
SDAH division holds 69.8% of the entire EMU coach holding of Eastern Railway. Full time services of AMM are essential.
Sl no
Item 2013-14 (upto Dec 13)
Target 2014-15
2014-15 Up to Dec 14
Remarks
8
Electric engine KM per engine failure(in thou. KM) (All services Territorial Basis)
218.0847 To be improved by 10%
462.7418
9 Specific Energy Consumption (KWh / 1000 GTKM)
Passenger – 20.55 Goods – 9.62 (up to Sept’13)
Passenger – Goods-
Passenger – 23.28 Goods – 9.31
(up to Sept’14)
10 Utilisation of Electric
Locos (Freight) 421.59 370 409.9
11 Utilisation of Goods Crew (in Avg. hours of duty in fortnight)
91.12 90 91.47
Page no. 48
Shifting of shunt signal No. 81 for shunting of 12 car rake at SPR
Carshed
After introduction of panel interlocking at SPR the existing shunting point was shifted towards car-shed by 149 Mt. But minimum requirement of car-shed for at least one shunting neck accommodating 12-car rake movement is 273Mt. In order to increase the length of shunting neck, 01 No. shunt signal has to be provided and the existing trap point No. 52B also needs to be shifted by more than 18 Mts. In the main estimate, sub estimate for signaling work was not considered. Hence revised estimate including signaling cost has been sent to HQ for approval. This work should be executed early as this car shed holds higher nos. of 12-car rakes in Sealdah division and presently unsafe shunting is resorted in order to maintain services.
TRS/Operation Organization
Electric/TRS Operation is looking after the overall aspect of management
of Electric Running Staff in the Division.
Daily 896 nos. of suburban EMU/MEMU trains are running in the
division. 306 nos. of trains are running with electrical loco per week.
A. Crew Lobbies under Electric/TRS:
Location Caters to which Section Nos. of Electric Crew
Sealdah/North Sealdah North & Main Section 331 Sealdah/ South
Sealdah South Section 189
Dumdum Entire Division and Up to Andul/S. E. Rly & Andal/E. Rly.
261
Naihati Entire Division and Up to Andal/E. Rly.
235
KOAA Mail Exp & Passenger 89 BT EMU Suburban 78
Total 1183
PROVISION OF ONE ADDITIONAL SHUNT SIGNAL
SHIFTING OF TRAP POINT NO 52 NEAR LC GATE NO 12/ST
SHUNTING OF 12 COACH RAKE AT SONARPUR
F
T
T
Page no. 49
B. Running Room:
C. Staff Position:
D. Position of Trains since Last 3-Years:
E. Operational Highlights:
� Daily Shed Notice as per crew link, monthly kilometer billing along with all due allowances for the suburban crew of entire Sealdah Division has been integrated with the sign safe system making it truly paperless.
� Kilometerage of loco pilots of Mail/Exp. Trains and freight trains of DDJ crew lobby is being generated through CMS and being sent directly to Personal Branch for charging with their salary.
Location Capacity (in beds)
Sealdah/North Rest Room (Combined Crew Booking Lobby)
28
Sealdah South Rest Room 20
Chitpur Rest Room 6
Dumdum Running Room 15
Naihati Running Room 16
Category Sanction On Roll
Loco Inspector 38 19 Loco Pilot / Mail 55 47 Loco Pilot / Passenger 535 453
Loco Pilot / Goods 228 128
Loco Pilot / Shunting 159 194
Asst. Loco Pilot 290 361
Total 1305 1202
Sl. No.
Category of services Year Working
LP (Dec’14)
2012 (July)
2013 (July)
2014 (July)
1 Mail/ Express (Services/week)
186 204 208 46
2 Conventional Passenger (Services/week)
84 84 98 22
3 EMU/MEMU Local (As per week days)
840 894 896 399
Page no. 50
� Bio-data which includes all promotional training and periodical medical examination details of all running staff has also been integrated with the sign-safe system. In case of any exigency the name and Bio-data of the Driver of any train can be obtained by simply sending an SMS to this system round the clock.
� Over time paid to the running staff (Electrical) is ‘NIL’ in Sealdah Division.
� All the Crew Lobbies of this department are provided with Fuel Sensor Based Breathalyzer for conducting mandatory Breathalyzer Test of the Crews during their On Duty & OFF Duty time.
� All the Crew Lobbies of this department have been provided with CCTV for recording mandatory Breathalyzer test of the crews during their ON Duty & OFF Duty.
� Naihati based crew has been given learning road in “Y” path for better utilization of crew as well as to increases flexibility of crews at BWN. Moreover LPG of DDJ have been provided learning road for BMG carshed and HWH PF departmental loco movement.
� Software has been developed departmentally for the use of CLIs to analyze ESMON data for checking over speeding of the train while entering PF.
� To reduce the duty hour of loco pilots in lieu of shunting work after arrival at KRP, Two LPS have posted at KRP for the shunting work. This will minimize late start of morning passenger trains from Lalgola due to inadequate out station rest of crews.
Activities:
� Scheduled and unscheduled maintenance of EMU rakes at EMU car sheds, outstation points and on line.
� Cleaning of EMU rakes at the car sheds and major outstation points.
CC TV
Page no. 51
� Trip inspection of Electric Locomotives at the trip sheds and attention of Electric Locomotives on line during unscheduled line failures/breakdowns.
Maintenance Points:
Four EMU Car-sheds and two loco trip sheds are functioning in Sealdah
Division. History of electric train operation in Sealdah Division began in
1963 with the commissioning of NKG Car-shed after conversion from
steam shed.
Ranaghat EMU Car-Shed:
RANAGHAT CARSHED was commissioned in 2007 to cater to the increased traffic requirement in RHA-GXD, RHA-LGL, RHA-BNJ & RHA-STB-KNJ section including MEMU service in SDAH-LGL section. Capacity of the shed is 12 Car Rakes – 14 nos with two numbers of Inspection bay with elevated track.
Services Run and section covered by Rakes of RHA Carshed Holding of RHA Carshed (as on 06.01.15)
EMU holding : 03 Nos 9Car & 06Nos 12 cars Rakes
MEMU Holding : 07 Nos 8 car rake
EMU services : 22 nos by 9car rake & 41 nos by12 car rake
EMU Car Shed Caters to
which Section
Date of Commissing
Present Holding
Daily Offering
EMU MEMU Narkeldanga EMU Car Shed ( NKG)
Sealdah North & Main
1963 34 -- 30
Sonarpur EMU Car Shed (SPR)
Sealdah South
1979 30 -- 28
Barasat EMU Car Shed (BT) Sealdah North
& Central 1990 35 --
29
Ranaghat EMU/MEMU Car Shed (RHA)
Sealdah-Lalgola
2011 09 07 EMU 07 MEMU 04
Loco Trip Shed
Narkeldanga Loco Trip Shed Sealdah Main Weekly out turn of 204 Mail/Exp. & 84 Conventional Loco hauled trains.
Chitpur Loco Trip Shed Kolkata Terminal
Page no. 52
(Section covered SDAH-KNJ, SDAH-STB, SDAH-DKAE, SDAH-HNB, RHA- GDX, KNJ-STB, SDAH-BNJ, and RHA-BNJ)
MEMU services : 8 car 8 nos service between SDAH-LGL section.
Out-Station Point:
Apart from 3 Car-sheds EMU rakes are stabled during night at various
out-station points. Mandatory inspections of daily night stabling rakes are
being carried out at the following locations.
*Dry
Sweeping
through
TRS is out
sourced at
SDAH/North, SDAH/South, NH, RHA & KRP. At remaining places dry
sweeping is outsourced through operating department.
Rake Holding: (As on 06.01.2015)
At present SDAH division has holding of 107 rakes of 9/10/12 Car
formation, out of which 7 rakes remain at POH workshop at
Kancharapara. Total 886 EMU services are maintained in Sealdah
division with daily outturn of 94 rakes. The shed-wise holding is as
follows:
9 Coach
10 Coach
12 Coach
Total MEMU
Out-Station Point
No. of Rake Stabled 9/10-Car 12-Car
Sealdah North 15 + 1 MEMU -- Naihati 3 -- Ranaghat pf 3 2 Santipur 3 -- Krishnanagar 2 -- Gede 3 -- Hasnabad 1 2 Bangaon 8 -- Krishnapur 2 MEMU --
Total in North Section
38 + 3 MEMU 4
Sealdah South 1 (10-Car)
1 (9-Car north CCR)
7
Canning -- 3 Diamond Harbour -- 4 Lakshmikantapur 1 (10-Car) 5 Namkhana -- 1 Total in South Section
3 20
Page no. 53
Narkeldanga 30 -- 01 32 -- Barasat 27 -- 05 32 --
Ranaghat 03 -- 06 09 06 Total North 60 -- 12 73 06
Sonarpur -- 4 25 29 --
POH 04 03 7 1 Total Division 68 40 108 7
Utilization of Rake:
Utilization of Rake(EMU):
Traffic requirement : North Section: 66 (Including NH-BDC)
: South section: 28
Total requirement including traffic spare: 94+1(Traffic spare for maintaining
punctuality at NKG)
Maintenance spare for four car sheds : 06 ( 04 maintenance spare . Due to combination of of 9/12 coaches ‘two additional spares are needed for maintenance and POH. )
Average rake under POH : 07 Total EMU train service : 886 Average Rake Km in use : 466.1 Average ineffective percentage : 11.59
Utilization of Rake(MEMU):
Traffic requirement : 04 Maintenance spare of MEMU : 02 Average MEMU rake under POH : 01 Total MEMU train service : 10 Average Rake Km in use : 390.6
Section wise Traffic Requirement & Utilization
Description North Section
(NKG, BT & RHA C/S) South Section
(SPR/CS)
Traffic Requirement 66 28
Utilization of 9/10 & 12-car Rake
9-Car 12-Car 10-Car 12-Car
58 8 4 24
Utilization of MEMU Rake 4 -- -- --
EMU services in SDAH division:
Page no. 54
Section 9-car 10-car 12 car Total SDAH(South) 18 22 285 325
SDAH (North) 493 -- 70+6* 563+6* Grand Total 511 22 355+6* 888+6*
*Additional 6 services are run between NH-BDC by HWH rakes
MEMU service : 8 car 8 nos service (between SDAH LGL section)
EMU/MEMU Activities:
Major Shed Activities:
INSPECTION PERIODICITY Scheduled
Time Average Out
turn
IC Inspection 180 Days 2 Working
Days 12 rakes/month
IA Inspection 45 Days 8-10 Hrs. 14 rakes/week
TI Inspection 10 Days 4-5 Hrs. 48 rakes/week
Lubrication Inspection(LI) 5-7 Days 2-3 Hrs. 60 rakes/week
Daily Insp.(DI)Shed/Night Stabling Point
Daily 1 Hr. 107 rakes/day
Over-Hauling of TM As per Arising -- 45 TMs/month
UST of Axles 6-Monthly -- 375
Axles/month Dry Sweeping Daily -- 93+3 rakes/day Washing 10 Days 2 Hrs. 9 rakes/day
O/H of EP Unit & Brake Controller
6-Monthly -- 90 EP Units &
18 Br. Cont./month
Wheel Turning As per Arising
(About 5 months) --
240 Axles/month
Unscheduled Lifting As per Arising -- 150 M/C & 15
T/C Per month
Filtration of Transformer Oil.
As per Arising 3-4 Hrs. 3 per week
Page no. 55
T R S O R G A N I S A T I O N
AMM/TRS
Post vacant
from March
M. K. Roy
AEE(OP)/TRS
CCC(R)/SDAH
Vineet Gupta
SR. DEE/TRS
DEE/TRS
Post vacant
from 03.11.14
P. S. Das
AEE/NKG
D. K. Yadav
AEE/SPR
K.K. Ray
AEE/BT
Narkeldanga
Carshed
Sonarpur
Carshed
Barasat
Carshed
SSE(I/C)/LOCO
S. Mondal
AEE/RHA
Ranaghat
Carshed
CCC(R)/DD CPC/SDAH CLIs
Page no. 56
Non-Gazetted Including Loco (As on 31.12.2014)
TRS (Maintenance) Organization
Category
SDAH Division RHA/CS
Sanctioned Strength On-roll Vacancies On-roll
Group - C
SSE 102 98 04 12
JE 118 85 33 14
CMS 05 04 01 --
Technician 1526 1034 492 72
TOTAL 1751 1221 530 98
Group - D
Unskilled 305 293 12 59
Safaiwala 57 40 17 03
GRAND TOTAL 2113 1554 559 160
Page no. 57
ELECTRICAL/TRD
Performance: Assets Failure
Punctuality performance-TRD
TARGET
Sl.
no. Subject Yearly
Proportionate
target
Current Year (Up
to Dec’14)
(2014-15)
Previous Year
(Up to Dec’13)
(2013-14)
2
Loss of Punctuality
(Train/As per assets
failure.)
48 nos. 36 06 nos. 54 nos.
Sl
no. Performance Parameters Target
Cumulative Achieved up to
December
% of Achievement
Current Year
(Up to
Dec’14)
(2014-15)
Previous
Year
(Up to
Dec’13)
(2013-14)
2014-15 2013-14
1. “E”-Internal failure
12
02 04
25% 50%
2. “F”-Panto entanglement due to
OHE defect. 00 01
3. “G” PSI & RC failure due to
internal failure 01 01
4. “D” – Other External Failure
but logged in Assets Failure 00 00
5. Tower wagon failure 00 00
Total 12 03 06
Page no. 58
ACTION PLAN TARGET ACHIEVEMENTS
Sl. No. Item
2014-15 2013-14
Yearly Target
Propo
rtiona
te
target
up-to
Dec’1
4
Cumula
tive
progress
since
April/14
to
Dec/14
(+)
Excess/
(-)
Shortfall
Yearly
Target
Proporti
onate
target
up-to
Dec’13
Cumul
ative
progre
ss
since
April/1
3 to
Dec/1
3
(+)
Exc
ess/
(-)
Sho
rtfal
l
1 AOH of OHE 1506.668 1130.
00 1201.16 71.16
1487.8
81 1115.91
1118.8
7
-
296
3
Replacement of
old Cantilever
assembly
152 114 286 172 800 600 783 183
4
Checking &
adjustment of
Cross-over &
Turn out
840 630 614 -16 831 623 527 -96
5 POH of ATD 603 452 396 -56 512 384 385 1
6
Replacement of
worn out contact
wire
15 11.25 12.635 1.385 15 11.25 17.032 5.78
2
7
Replacement of
weak/overage
Catenary wire
20 15 14.1712 -0.8288 20 15 11.094
-
3.90
6
8
Improvement of
Tight planted
mast (Nos.)
150 112 44 -68 150 112 153 41
9
Relay
setting/testing
at FP/TSS
38 28 17 -11 38 28 11 -17
10
Provision of
insulated
cadmium copper
catenary wire
under over line
structure [100 %
Coverage]
5 4 7 3 8 6 11 5
11
Application of
Balmerol rope
lube on SS wire
2599 1949 1616 -333 2464 1848 1595 -
253
12
Annual
Maintenance of
Capacitor bank
(SMI-
TI/MI/0026-rev-
2)
11 8 9 1 11 8 10 2
Page no. 59
13
Checking of PG
clamp at G
jumper
29775 2233
1 12867 -9464 29775 22331 12064
-
102
67
14 Replacement of
pin insulator 60 45 58 23
15
Replacement of
old LA (strictly
as per SMI No.
TI/MI/
0041/rev-0 with
A&C slip No. 5 &
6 dated 14.10.05
0 0 2 2 0 0 0 0
16
Replacement of
conventional
steady arm by
BFB steady arm
200 150 291 141 500 375 988 613
18
Replacement of
contact wire
ending clamp
315 236 86 -150 40 30 93 43
19
Replacement of
Catenary wire
ending clamp
315 236 93 -143 40 30 115 85
21
Removal of
failure prone
core insulator of
section insulator
of SNCF make)
40 30 27 -3 56 42 34 -8
22
Replacement of
insulators by
composite
insulators
0 0 667 667 0 0 638 638
23 Gantry
maintenance 68 51 68 17 68 51 54 3
24
Checking of RRA
clamp to avoid
necking &
parting of
contact wire
2558 2144 1557 -587 2558 2144 1262 -
882
25
Live line
checking by 8-
Wheeler Tower
wagon
1342.75 1007 1564.95 557.95 1279.7
76 959.832 1582
662.
168
26 Checking of
Buried rail 9 7 7 0 8 6 9 3
Page no. 60
Highlights and Achievements
REPLACEMNT OF OLD / OVERAGED/ NON STANDARD COMPONENTS
During the fiscal year of 2014-15
i) 12.635 Kms. Worn out contact wire replaced.
ii) 14.171 Kms. Damaged & overage catenary wire replaced.
iii) 667 nos. different types of over aged, damaged & broken insulator
replaced.
iv) 291 nos. round Steady arms replaced by BFB steady arms.
v) 07 sets Old & over aged Battery (40 AH & 110 volt) replaced by new
sets.
vi) 286 Nos. old & over aged Cantilever assemblies replaced by new one.
vii) 28 nos. 5 pulley types & 08 nos. 3 pulley small type ATD have been
replaced by 3 pulley modified type ATD.
viii) 407 nos. corroded tube/steady arm replaced.
ix) 4534 nos. damaged dropper wire replaced.
x) 58 nos. failure prone Pin insulators replaced.
Modification of OHE
A) Point no. 120 A & B made electrical Fit:- The point no. 120 AB, which was
out of order for electric traffic since long, has been made fit for electric traffic
at BP. The work was executed departmentally.
B) Formation of new insulated overlap at KYI to sort out operation
problem:- There was a prolong problem at KYI, where starter signal was
placed beyond the overlap, which is not as per recommendation of ACTM.
There was operational problem also. To sort out this issue one new insulated
overlap has been created beyond the starter signal & near the newly
constructed KYI/SSP. The operational problem has been sorted out
permanently.
C) Replacement of Current Transformer at SPR/GSS : The current
transformer of SPR/GSS across the Tr-1 and Tr-2.has been replaced by
higher ratio CT (02 nos. against each traction transformer). The earlier ratio
was 1000/5.75, which has been replaced by 1600/1.
D) Replacement of Control panel along with all protective electromagnetic
relays: :- The control panel along with all protective electromagnetic relays
have been replaced by new control & relay panel at SPR/GSS.
E) Adjustment of OHE at MJT station for erection of Platform shed:- 8
nos. cantilever assembly of portal structure & OHE on Platform no. 1 & 2
have been adjusted to make it compatible to continuity of platform shed by
departmentally.
F) Dismantling of insulated overlap : The 4 span insulated overlap in front of
MGT/SSP has been dismantled by providing section insulator assembly. The
modification work was executed in connection with proposed forth coming
metro work.
G) Normalization of OHE at BLN on Chord line due to dismantled two
cross over ::At BLN near the Bondel Gate, the defunct & unserviceable OHE
Page no. 61
has been dismantled approximately 545 m. The OHE had been terminated
at the either end and the middle portion including section insulators
dismantled, to make the section more reliable. The necessity of this
modification has been raised as the Engg. Wing had dismantled two cross
over at Chord line.
H) Wiring the buffer beside Up Suburban line near point no. 57: The buffer
beside Up Suburban line near point no. 57 has been wired. The pantograph
of electric loco entangled on that point as the buffer line was unwired. The
Loco shunting problem has been eradicated on permanent basis.
I) Modification of OOR OHE at KNR and IP: 02 nos. OOR OHE have been
modified and overlap on main line adjusted due to anchor mast (tight
implanted) exist in between DN/S/Line and UP/S/Line. The same shifted
on UP/S/Line by providing TTC and by splicing 110 m contact and catenary
wire and 3 pulley modified spoke type ATD.
J) Dismantling of OHE at KNR:- The down dispatch line no. 2, approximate
length 1068 mtr, at KNR has been dismantled along with all relevant
accessories. The Engg. Department has suspended that line. The released
materials (partially) send to NH for wiring line no. 1.
A) Wiring of line no. 1 at NH Yard: The line no. 1 at NH yard has been wired
with the released catenary & contact wire from KNR. Since this division is
running with acquit shortage of contact wire, therefore release contact wire
has been used with suitable splicing.
K) Enhancement of Electrical clearance at ASKR PTFE:- AT ASKR/FP PTFE
neutral section provided at loc. no. 41/25 & 41/18 on UP & DN line
respectively. The feeder has been drawn on both lines to feed the section
towards BNJ. The clearance in between feeder wire & catenary wire was less
on both lines. Separate cantilever assemblies have been provided & dropper
profiles adjusted to increase the clearance on both UP & DN line at location
41/18/1 and 41/18 respectively. The work was executed departmentally
L) Conversion of insulated over lap to un-insulated over lap on UP & DN
Chord line :- To improve the sectioning arrangement & to replace bend
steady arm, insulated over lap converted to un-insulated over lap by
replacing 17 nos. cantilever assemblies at loc
8x/40,8x/38(2),8x/36(2),8x/34(2), 8x/32,
8x/41,8x/39,8x/37(2),8x/35(2),8x/33(2) and 8x/31 during December ’14.
M) Conversion of Cross Type Turn Out into Overlap Type Turn out :- To
improve the reliability of OHE, Cross type turn out has been converted into
overlap type turn out in between loc. no. 73/15- 73/13, section RHA- GXD.
N) Replacement of Old and Over aged 600 Amp Isolator :- To improve the
reliability of Isolator, 02 nos. obsolete & under rated isolators with capacity
600 Amp of SM-109 & SM-110 has been replaced by 1600 Amp capacity
Isolator
O) Replacement of Old and Over aged Stay & Bracket insulator :- To
improve the reliability of OHE, 08 nos. Old and over aged stay insulator
Page no. 62
(Make – CGEC, Batch- 1964) has been replaced at loc. no.
8x/20,8x/26,8x/24,8x/42,9x/2,9x/6, 9x/12 and 9x/28
System Improvement
1. High Power Factor Rebate:- Due to improvement in power factor (PF) of
traction power supply in Sealdah division, a rebate of Rs. 16.00 lakhs
have been achieved in the energy bill from WBSEDCL for the month of
NOv’14. Total rebate achieved during the year is Rs 177.48 lakhs in 8
month.
2. Replacement of Delta-I relay by Vectorial Delta-I Ralay :-For
improving reliability and protection system of OHE , 01 no. Delta-I relay
replaced by Vectorial Delta-I Ralay against CB-504.
3. Reducing of OHE Tripping: -
• For reducing of OHE tripping 22706 nos. trees have been trimmed by
departmentally.
• For reducing of OHE tripping, 2312 nos. Bird Nest, 239 nos. Foreign
material and 9547 nos. Kite & Kite threads have been removed from
the line.
4. Joint checking of Pantograph at Car shed : -
For reducing of OHE tripping, 824 nos. Unit against 290 nos. EMU jointly checked by TRD and TRS supervisor during 2014-15.
5. Replacement of Failure Prone Insulator: - 21 nos. failure prone anchor
insulator (WSI- 1/1989, NKG - 1980) have been replaced by composite 9-
Ton insulator in BT- BNJ section
6. Replacement of Failure Prone SNCF make core insulator of Section
insulator assembly: - 27 nos. core insulator of section insulator have
been replaced for prevention of failure of core insulator of section
insulator on main line.
Safety Initiative
1. Staff Education
i) Total 84 nos. staff sent for training at Thakurli (THK)) & CKP
training centre as per schedule.
2. Replacement of Tight implanted Masts:-In view of the passenger &
staff safety, 44 nos. Tight implanted mast relocated suitably during 2014-
15.
3. Provision of Bonds: - 1654 nos. different type traction bond has been
provided over the division to ensure safety of human being and TRD
equipments.
Others
1. Disposal of Scrap:
98.82 MTs ferrous and 21.76 MTs non- ferrous material have been
deposited at HLR/Scrap yard during 2014-15 against target 60 MT
ferrous and 35 MT non-ferrous respectively.
Page no. 63
II) ASSISTANCE REQUIRED
1. Posts Sanctioned against existing Vacancy through RRB & RRC selection.
Sl.No.
Section (New line by RE/Doubling/Gaug
e conversion)
Nos. of post vetted by Divisional Finance
Panel received as
on date
Balance posts
Remarks
a
Staff G.P.-1900/-
(Existing vacancy) Vide DRM/SDAH’s
Letter No.E-18/TR/RRB/Indent/2014 dt.30-01-14
100 60 40
Only 26 nos. candidate reported
b
Staff G.P.-1800/-
(Existing vacancy) Vide
Sr.DPO/SDAH’s Letter No.E-
22/Indent/RRC dt.16-6-14
69 22 47
Balance post early required
3.. Existing Staff position:
Category SANCTIONED STRENGTH
On-roll Vacancy % Vacancy
SSE 46 35 11 23.91
JE 53 37 16 30.18
Artisan & Group-
D 790 628 162 20.50
Total 889 700 189 21.25
The above vacancies may kindly be filled up.
Page no. 64
General Information of TR-D/SDAH
Sl.
No. Items Sealdah
1. Electrified Route (Km) 692.955
2. Electrified Track (Km) 1604.173
3. 132 KV/25 KV Traction Sub Station 03 (Barasat, Debagram &
Cossimbazar)
4. Feeding Posts 05 (TGH, RHA, ASKR, SPR &
LKPR)
5. Switching Station 62
6. Sanctioned Staff Strength 935 (0.582 per TKM)
7. Total Man on Roll
734 (0.457 per TKM)
(As per Rly. Board’s letter
No.2001/Elect/G/138/3/PT dated
16/3/2012 yard stick for maintenance ,
0.70 in suburban & 0.45 non-suburban
section)
8. OHE Maintenance Depots 11
9. PSI Maintenance Depot 4
10. Tower Wagons
16
(8 Wheeler -05 nos.
4-Wheeler – 11 nos.)
Page no. 65
Traction Distribution
� TRACTION DISTRIBUTION department is responsible for maintenance & operation of Overhead equipments, Power supply installations, Substation Installations & remote control to supply necessary electric power to Electric Locomotive/EMU.
� Electric Traction with 25KV ac was first commissioned on Sealdah Division in 1963 between Sealdah – Naihati and out of total 708.27 RKM in this division 692.955 RKM, i.e. 98% route is electrified. The total TKM in Sealdah Division is 1604.173.
� 25 KV, 50 Hz Single Phase supply for electric traction to feed OHE in SDAH Division is taken from West Bengal State Electricity Distribution Co. Ltd. Sealdah Division receives Power at two levels – 25 KV Single Phase supply derived from 5 Grid sub-station owned by WBSEDCL and feed to OHE though 5 feeding post viz. Titagarh, Ranaghat and Ashoknagar in SDAH/North and Sonarpur and Lakshmikantapur in SDAH/South Section and 132KV supply taken from WBSEDCL and through Traction Transformer (21.6 MVA) step down the voltage to 25KV at Barasat Traction Sub-statio, Debagram Traction Sub-station & Cossimbazar Traction Sub-station owned by this division.
� Traction power supplied from various Feeding post and traction sub-station is controlled by Traction Power Controller (TPC) from Remote Control Centre situated at Sealdah control room.
� The total number of switching station in this division is 70 including Feeding Post/Traction sub-station. All the operations of these switching posts are controlled by TPC from RCC at Sealdah i.e. remotely operated from RCC at Sealdah.
� The Remote control system is completely microprocessor based SCADA system where data is logged along with supervisory control. In Sealdah Division SCADA communication is done in two ways i.e. through OFC in North , Main section & a portion of south section and through 18 Giga Hz Micro wave communications in remaining portion of South Section.
� The OHE is maintained by 11 Nos. OHE depots located at Narkeldanga (Sealdah), Barrackpore, Halisahar, Ranaghat, Cossimbazar, Barasat, Basirhat in Sealdah North & Central Section and Sealdah (South), Sonarpur, Baruipur & Lakshmikantapur in South Section.
� Power supply installations are maintained by three nos. depots located at Narkeldanga (Sealdah), Naihati , Sonarpur & Debgram.
Besides this Division has one Central Store Depot located at Sealdah, one Tower
Wagon Maintenance Depot located at Narkeldanga. Also one Construction Depot
located at Sealdah is looking after different Construction activities executed by this
division.
Page no. 66
NH – GXD Section
Salient Features
� RKM : 78.81
� TKM : 236.46
� Type of Telecommunication : OFC + 6 QUAD � Type of Signalling : Std-I MACLS � Feeding Post : 01 No. i) Ranaghat/FP
� Switching Post : 09 Nos. SSP – 08
(i) Naihati/SSP (ii) Kanchrapara/SSP (iii) Kalyani/SSP (iv) Chakdaha/SSP (v) Ranaghat/X-ing/SSP (vi) Aranghata/SSP (vii) Bagula/SSP (viii) Majhdia/SSP
SP-01 (i) Kalyani /SP
� OHE Maintenance Depot : 02 Nos. i)Halisahar (Section – KNR – RHA/FP KM- 34/26Q,34/25Q, 34/25,34/26 to 70/13,70/14) ii) Ranaghat (Section –RHA/FP – GXD, RHA – KNJ, KM- 70/13,70/14 to 116/34, 116/35)
� PSI Maintenance Depot : 1 No. i) Naihati (NH- GXD)
� 8 Wheeler Tower Wagon Shed : 2 Nos. i) Ranaghat ii) Halishar
Page no. 67
OHE Assets over NH - GXD Section
No. Of OHE Depot : Halishar, Ranaghat
No. of Tower Wagon : 02 nos.
Sl. No.
Particular of Items On line
1 OHE in TKM 236.46
2 Number of Crossover 47
3 Number of Turn Out 109
4 Number of Regulating Equipment (5 Pu;lley/3 Pulley Modified ATD)
430
5 Number of SECTION INSULATOR 111
6 Number of FTA 44
7 Number of ISOLATOR 89
8 No. of PTFE
(Make – Aurther Flurry) 02
PSI Assets over NH - GXD Section
Number of Feeding Post : Ranaghat
Number of FP/SSP/SP : 10
Sl no.
Particular of Items On line
1 25 KV Circuit Breaker 04 2 25 KV Interrupter 43 3 25 KV Double Pole Isolator 46 4 25 KV Single Pole Isolator 04 5 25 KV Current Transformer 05 6 25 KV Potential Transformer 34 7 42 KV Lightning Arrestor 43 8 Auxiliary Transformer (10 KVA) 80 9 Gantry 10 10 Capacitor Bank 01 11 Earth Pit 174
Page no. 68
RC Assets over NH- GXD Section
Sl no.
Particular of Items On line
1 Nos. of RTU 10
2 Nos. of Battery
110 V 40Ah 110 V 200Ah
09 01
3 Nos. of Battery Charger
5 Amp 40 Amp
07 04
4 Control Panel Relay
Two Feeder CB 02
5 Capacitor Bank control Panel 01
O R G A N I S A T I O N
A. GAZETTED
D. K. Kundu
Sr.DEE/TRD/SDAH
S. N. Das
DEE/TRD/ SDAH
R. Kamboj
AEE/TRD/North
P. K. Mitra
AEE/TRD/South
R. B. Chowhan
AEE/TRD/RHA
B. NON-GAZETTED
CATEGORY SANCTIONED STRENGTH
On-roll Vacancy
SUPERVISORS 99 72 27
Draftsman 03 02 01
Skilled Artisan 498 357 141
Group - D 292 273 23
Ministerial 36 26 10
Steno & typist 07 04 03
TOTAL 935 734 201
Page no. 69
ELECTRICAL/GEN.
I) PERFORMANCE
TL & AC Wing
S. No. Item
2013 – 14 2014 – 15
Achieved in
2013 – 14 (Dec)
Achieved in
2014– 15 (Dec)
1 No. of incident of Train Lighting failure (LOP Cases) 0 0
2 No. of incident of AC failure (LOP Cases) 1 1
3 Failure of AC Coaches (Non-AC) 1 1
4 Ineffective AC coaches (%) 0.086 0.034
5 Ineffective TL coaches (%) 0.047 0.011
Improvement of TL & AC Coach service
Sl.
No. Item
2013-14 2014-15
HQ target
(Dec)
Achieved (up
to Dec)
HQ target
(Dec)
Achieved (up
to Dec)
1 Conversion of Maneurope to Scroll
Compressor. 58 22 44 24
2 Provision of capacitor bank in LHB
coaches - - - 35
3 Cable looping in switch board cabinet
of LHB Coaches. 52 7 27 27
4 Provision of canvas duct cover in LHB
Coaches. - - 79 71
Power Wing
Sl. No Items
2013-14 2014-15
HQ. Target
(Dec)
Achieved
up to
(Dec)
HQ. Target
(Dec)
Achieved
up to
(Dec)
1 Non-traction energy consumption in MU 29.35
(upto Nov)
35.27
(upto Nov)
34.4 (upto
Nov)
35.95
(upto
Nov)
2 Segregation of 70%-30% lighting circuit at station. 7 2 26 23
3 Electrification of LC Gates (Conventional) 3 2 5 2
4 Use of T-5 FL fittings in place of T-12 /T8 1500 702 1500 2586
5 Replacement of old 90W. Ceiling fans with
60/55W 375 780 750 949
6 Use of T-5 FL fittings in place of T-12 FTL fittings. - 1 5 15
7 Provision of Auto change over switches at stations. - 6 7 7
8 Replacement of 150W MH with 80W CFL in Street
Light. - 38 - 292
9 Commissioning of news lift as per sanction 3 1 2 2
10 Renovation of new lift as per sanction 1 0 2 1
Page no. 70
A. Power Wing:
A.1. Improvement of illumination has been done with energy efficient (2x28W) T-5 fittings at
PF shed, PF open area, Booking & Passenger Halt, FOB & approach road at the following
Rly. station:
Sl No. Name of station Location
1 Bhayana Newly constructed PF shed at PF-1 & 2
2 Bahirgachi Newly constructed PF shed at PF-1 & 2
3 Kankinara PF shed at PF-2&3 and FOB
4 Sealdah PF-4A, 9, 6 & 7, Booking area, Stn. Bldg.
5 Taraknagar Newly constructed PF shed at PF-1 & 2
6 Harishnagar Newly constructed PF shed at PF-1 & 2
7 Kolkata PF shed at PF-1&2, FOB, 1st & 2nd class waiting room
8 Ballyguage Booking & Circulating area
9 Satberia PF shed-1
10 Akaipur PF shed-1
11 Nabarainagar PF shed-1
12 Mayurhat PF shed-1
13 Bally Halt PF shed & concourse
14 Beliaghata Road PF shed, Booking area, Passenger Hall & Circulating area
15 Majerhat PF shed
16 Kalyani PF shed & FOB
17 Khardah PF shed
18 Agarpara PF shed
19 Sodepur PF shed
A.2. 4 nos. Submersible pump have been installed at the following Rly. stations:
• Harishnagar
• Betberia Ghola
• Bahirpuya
• DDJ station colony
A.3. Energy conservation:
• Despite increase in load about 2.19% compared to last year 2013-14 Overall
consumption has been decreased by 1.17% Compared (April’13 – Nov’13) to
(April’14 – Nov’14). Though additional load for Bogie factory at BGB, full length PF
sheds, additional PFs due to doubling work, yard lighting for night maintenance work
etc. are included during 2014-15.
However we are closely monitoring at Major load points for further saving of
electricity.
• Graphical representation of month wise comparative study of energy consumption
between 2013 & 2014.
Page no. 71
• Energy conservation efforts:
a) 70% - 30% Lighting system with timer have been provided in 23 Nos. Rly. Station.
b) 2586 Nos. Energy efficient T-5 FL fittings have been provided by replacing
conventional FL fittings at Rly. stations & Colonies.
c) 353 Nos. CFL fittings have been provided at Stair Cases, office toilets, bath room&
also replaced against high wattage (150W HPSV) lamps.
d) Pump timing has been reduced to minimize wastage of water & to conserve energy.
e) Electrical(G) department has observed Energy Conservation week from 8th
December to
14th
December’2014 through Poster, banner & departmental seminar at various
installation in this division to grow awareness regarding Energy Conservation among the
staff & user Passenger.
f) Total nos. unauthorized tapping has been disconnected during 2014 - 15 (up to
Dec’14)
g) Removal of ACs from chambers of non-entitled officers & rooms.
A.4. Newly Constructed Full length Platform shed has been electrified with energy efficient
(2x28W) T-5 fittings at
o Bongaon PF-1, 2 & 3
o Budge Budge PF-1
o Barrakpore PF-1
o Bashirhat PF-1 & 2
43.16 46.45 44.77 46.43 45.27 44.37 43.88 38.38
42.37 45.62 45.57 46.11 45.13 43.02 44.01 37.77
-5
5
15
25
35
45
55
Apr May Jun Jul Aug Sep Oct Nov
2013
2014
Page no. 72
A.5. Total 16 nos. Multi points Mobile Phone Charger unit has been installed at various
locations (Platforms & Waiting room) at Sealdah & Kolkata Rly. stations.
A.6. Annual Over Hauling Status 2014-15
Sl. No. Items Total Population
AOH completed
(Up to
Dec’14)
1 Transformer 79 68
2 H.T.OCB / VCB 145 125
3 L. T. OCB / ACB 181 117
4 Pump 338 138
Staff Amenities :
• New Passenger lift have been commissioned at the following locations:
o Dy CEE/Con/SDAH office; 6 passenger; G+2; make: OTIS.
o B R Singh Hospital Surgical Block; 10 Passenger; G+2; make: Thyssen Krupp
• Replacement of old lift:
o New Alipore Officer’s colony; Block 7A; 18 Passenger; G+9; make: Omega
• Rewiring has been done in 72 unit Rly. quarters & 136 nos. conventional type house
service meter replaced by digital type.
B. Coaching Wing
Page no. 73
B.1. The following new train services, special trains have been introduced /
frequency increased during 2014–15:
• New train service 13131 UP/ 13132 DN from Kolkata to Anandvihar has been started on
& from 01.07.14 with 3 os. AC coach & 15 nos. Non-AC coaches.
• Frequency of train service has been increased from 6 days week to daily in 13187 UP/
13188 DN Sealdah Rampurhat Maa Tara Express w.e.f 08.06.14.
• Frequency of train service has been increased from 1 day week to 2 days a week in
13109 UP/ 13110 DN Sealdah Dhaka Cant. Maitree Express w.e.f 04.01.15.
• Total 19 nos. Special trains (From SDAH 12 nos. & from KOAA 7 nos.) were servicing to
clear summer, puja & other festival rush.
• Additional 15 nos. AC coaches & 9 nos. Non-AC coaches have been augmented
permanently during April’14 to December’14 in following trains:
o Kolkata - Lalgola Hazarduari Express
o Kolkata - Radhikapur Express
o Sealdah - New Delhi Duranto Express
o Sealdah – Amritsar Akaltakht Express
o Sealdah – Udaipur Annanya Express
o Sealdah – New Jalpaiguri Padatik Express
• Additional 712 Nos. AC Coaches & 671 Nos. Non-AC Coaches were run to clear extra rush.
B.2. Intermediate Over Hauling Status 2014-15
Sl No. Type of coach IOH completed (Up to Dec’14)
1 TL 494
2 SGAC 79
3 EOG 61
Page no. 74
4. System Improvements:
� As per Rly. Bd.’s directives, installation of Capacitor bank with MCB in in 35 nos. of LHB
coaches have been completed.
� Fueling of Power Car of 12359 Up / 12360 Dn Kolkata-Patna Garib Rath Exp. has been
started at Kolkata Terminal coaching depot on & from 07.08.14. Previously fueling of this
train was done from Patna.
� New Sub-station has been energized & commissioned at Budge Budge Fiat Bogie
manufacturing factory with 5 nos. 750 KVA Transformer, HT & LT panels & 3 nos 350 kvar
APFC panel.
� About 138.6 Tonne of Scrap material have been disposed.
(Ferrous–
Page no. 75
II) Assistance required :
� This office proposal for sanction of 185 posts for new trains for both AC Coaches and TL
Wing, has been sent to HQ vide DRM/Sealdah’s letter no. AR/550/AC&TL/302Posts/E-15 dt.
02. 03. 2011. HQ asked some queries and the reply was sent to HQ on 21.11.2013 vide
DRM/SDAH’s letter No. AR/550/AC&TL/185 posts/E-15/22 dt. 21.11.2013. It is also
mentioned that a D.O. letter no. EL/G/Justification/65, Dt. 2306.14 was sent by DRM/SDAH
addressing to GM/ER Kolkata & copy to CEE/ER/KKK & others. At present the subject
proposal is lying at CPO/KKK’s office.
� To clear the O.T. backlog additional fund to the tune of Rs. 10 crores (approx.) are
required as one time measure. In this connection a D. O. letter no. EL/B/ARF/1314,
Dt. 11.07.14 was sent by DRM/SDAH addressing to FA & CAO/KKK & copy to
CEE/ER/KKK. This has also informed to CEE/KKK vide this office letter
no.EL/B/ARF/13/14, Dt. 20.06.14. But no additional fund has been received as yet.
The fund allotted for this year has totally exhausted and unions are pressuring hard
to pay the backlog O.T. to the staff immediately. Additional fund to the tune of Rs.
9.5 Crore has been asked in RE for clearing the backlog.
� At present there are 8 vacancies in SSE category & 15 in JEE category (including DRQ)
and one JEE will retire in the month of March 2015. Therefore total vacancies of
supervisor category (SSE & JEE) will be 24 in the month of 1st
April 2015. Letter from
Sr. DPO for supplementary panel has been communicated to CPO/KKK vide letter no.
E-198(G)/JEE/DRQ/Recrtt/2013-15, Dated.10.11.14
� It is requested for allotment of 28 Tech Gr-III for Elec(G)/SDAH. CPO/KKK informed vide
DRM/SDAH’s letter no. E-18(TR)/RRB /Indent/2014, Dt. 18.09.2014. At present there are 175
vacancies in Artisan & Gr. “D” category and 43 staff will retire within the March 2015.
Brief overview of Electrical(G) Sealdah
A. Power Wing:
A.1. Roles & Responsibilities of Major Work Centre
SSE/G/SDAH-I:
• 2 Car Sheds at Narkeldanga & Sonarpur and Work Shop at Beliaghata, Running room & store.
• Entire South section, Circular Rail Khidirpur - Majerhat & Dum Dum Jn. – Bally Halt, Bimanbandar &
Dum Dum Cant. Total station: 77, RKM: 241.59.
• Colonies at Narkeldanga, Moghal bagan, Kamardanga, Guripara, Ballygunge, New Alipur stn., Budge
Budge, Sonarpur, Baruipur, Canning, Lakshmikantapur, Diamond Harbour, Patipukur, Dum Dum
Cant. & Dakshineshwar Total no. of quarter: 1669.
• Sub-station at SDAH, Moghal bagan, Dum Dum Jn., Patipukur, Dakshineswar, Sonarpur,
Laksmikantapur & Budge Budge, Total no. sub-station: 20 nos.
Page no. 76
SSE/G/SDAH-II:
• DRM building, Control building, BR Singh Hospital & store.
• Colonies at GM Bungalow, Belvedre Park, Judges Court Rd, New Alipur, Gholsapur & Sealdah,
Total no. of quarter: 1091.
• Sub-station at DRM Building, New Alipore, Belvedre, Judges Court Rd, Gholsapur & BR Singh Hospital
Total no. sub-station: 7 nos.
SSE/G/CP:
• New K.G. & Old K.G. Office Buildings, CP Yard, Cossipore yard, Running room & store.
• Kolkata Stn., Circular Railway form KOAA to PPGT, Total station: 8, RKM: 12.07.
• Colonies at Dakshindari, Ultadanga, Chitpur & Cossipore, Total no. of quarter: 1184.
• Sub-station at , Total no. sub-station:
SSE/G/BT:
• BT Car shed, BT Yard, Running room & Store.
• BBT – BNJ & BT – HNB stations, Total station: 41, RKM: 115.32.
• Colonies at Barasat, Barasat car shed, Madhyamgram, Bira, Duttapukur, Habra, Machlandapur,
Gobordanga, Chandpara, Bongaon, Bashirhat & Hasnabad. Total no. of quarter: 902.
• Power Houses at
SSE/G/NH:
• Mech. Shop at NH & NH Yard, NH hospital, Running room & Store.
• BLH- PXR station, Total station: 22, RKM: 55.25.
• Colonies at Naihati, Nigelnagar, Ambagan, Naihati hospital, Kankinara, Shyamnagar, Ichhapur,
Barrackpore, Titagarh, Khardah, Agarpara & Kalyani. Total no. of quarter: 1979.
• Power Houses at
SSE/G/RHA:
• Diesel Loco & EMU Car Shed RHA, RMS Building, Health unit, Running room & Store.
• CHD-LGL, RHA-GXD, RHA-BNJ & RHA to STB, Total station: 59, RKM: 1793.
• Colonies at Ranaghar CRE, Ranaghat, Gede, Shantipur, Krishnanagar, Beldanga, Beherampur,
Murshidabad, Bhabagangola & Krishnapur. Total no. of quarter: 1979.
• Power Houses at
A.2. Staff position (Power Wing)
Staff Sanctioned On Roll Vacancy
Power Wing 913 699 214
Ministerial
Supervisor
Total
Page no. 77
A.3. Major Assets (Power Wing)
� Total Sub Station: 41 nos. [ 11 KV:12 nos. & 6KV: 29 nos.]
� Total HT Feeding points: nos. [CESC: nos., WBSEDCL: nos.]
� Total LT Feeding points: nos. 346[CESC: nos. 84, WBSEDCL: 262 nos.]
� Total Standby DG Sets: 22 nos.
� Total no. of 207 stations are electrified.
� Total no. of Pumps of various capacities: 338 nos.
� Total no. of 409 LC gates are electrified, none of the LC gates are non-electrified.
� 31 no. of Lifts & 3 nos. Escalators are being maintained.
� Total no. of AC machines: nos. [Window AC: 340 nos, Split AC: 361nos & 38 Package unit]
� Total no. of Central AC Plant: 4 nos.
� Total Water cooler: 73nos. [45 nos. in 38 stations & 28 nos. in offices]
� Total no. of Quarters: 8618 nos.
B. Coaching Wing:
B.1. Roles & Responsibilities of Major Work Centre
SSE/TL/SDAH
• Maintenance of Primary coaches (total: 610 nos), originating from SDAH & Secondary trains at
SDAH.
• Maintenance of ART, ARME & all Saloon Coaches.
SSE/ACC/SDAH
• Primary maintenance of all SG AC coaches, (holding 126 nos.) originating from SDAH & also AC
coaches of secondary trains.
SSE/EOG/SDAH
• Maintenance of all EOG(Rajdhani & Duranto) coaches originating from SDAH, holding 118 nos.
SSE/Sick Line/SDAH
• Major Repairs of TL, SGAC, EOG Coaches.
SSE/TL & AC/CP
• Primary Maintenance of KOAA originating trains (TL & AC total 430 nos.) & Secondary maintenance
of trains.
SSE/TL/Store
Page no. 78
• Handling of all stock & Non-stock items of TL, SGAC & EOG coaches.
B.2. Staff position (Coaching Wing)
Staff Sanctioned On Roll Vacancy
AC Coaching 497 596 -99
TL Maintenance 352 319 33
Ministerial
Supervisor
Total
B.3. Major Assets (Power Wing)
� Total SG AC coach holding: 315 nos.
� Total SG TL coach holding: 969 nos.
� Primary trains: 53 nos.
� Secondary Trains: 12 nos.
� Primary maintenance depot: 2 nos.
Page no. 80
MECHANICAL/C&W
I) PERFORMANCE:
WAGON EXAMINATION
C
OACHING PERFORMANCE:
S. No
Item Actual for
2013-14
(Apr-Dec)
target for
2014-15
(Apr-Dec)
Actual for
2014-15
(Apr-Dec)
1 Coach Ineffective %
AC Mech 5.37 8.0 8.04 Elect 0.95 1.5 0.94 Total 6.32 9.5 8.98
Non-
AC
Mech 5.54 7.0 5.81 Elect 0.11 1.0 0.16 Total 5.65 8.0 5.97
2 Punctuality Loss cases (Direct) 0 3.78 0 3 Punctuality Loss cases(Total) 0 7.47 0 4 En route Coach Detachment
a) Territorial 0 0 0 b) Ownership 0 0.72 2
5 Secondary Coach Detachment a) Territorial 3 4.5 0 b) Ownership 33 15 5
6 Passenger complaints (yearly) 129 43 87 7 IOH Done by Division
a) 18M ICF coach IOH in division per month
326 225 490
b) IOH of newly built ICF coach in 45-100% 100% 26-100%
Month 2013-14 2014-15
Pre ETE CC Total Pre ETE CC Total Apr 61 101 26 188 87 76 30 193 May 57 73 22 152 82 76 24 182 Jun 45 85 23 153 71 68 14 153 Jul 43 100 24 167 74 53 27 154 Aug 46 107 21 174 70 77 23 170 Sep 73 117 23 213 62 72 19 153 Oct 57 102 22 181 58 73 24 155 Nov 50 104 29 183 75 79 24 178 Dec 67 68 32 167 88 85 26 199 Total 499 857 222 1578 667 659 211 1537 Avg/Month 55 95 25 175 74 73 23 171 % increase -2.60
Page no. 81
S. No
Item Actual for
2013-14
(Apr-Dec)
target for
2014-15
(Apr-Dec)
Actual for
2014-15
(Apr-Dec)
division (yearly)
8 Pantry detach for I/ cleaning & Pest/rod control
100% 100% 100%
9 Monthly I/cleaning & PC treatment of AC coaches
100% 100% 100%
10 Pantry vacation at PF 100% 100% 100% 11 Performance of linen
11.1 Disposal of condemned linen (as % of condemnation)
52.84 90% 0.0
11.2 Screening before sending for washing (as % of used linen) avg. per day
13.82 20% 20%
12 OBHS (% of train covered as per RB’s guide line)
SDAH-12, CP-12 100%
100% SDAH-12,
CP-14 100%
13 LHB 13.1 CDTS functioning 97.84 100% 100% 13.2 WSP functioning 95.00 100% 100% 13.3 Earthing device functioning 92.02 100% 92%
FREIGHT PERFORMANCE:
SN
ITEM
Actual
for
2013-
14
(Apr-
Dec)
target
for
2014-
15
(Apr-
Dec)
Actual
for
2014-
15
(Apr-
Dec)
1 Freight Ineffective (% )
1.1 Divisional Account 1.22 1.80 1.07
1.2 POH Account 0.56 0.70 0.60
2 Train Parting (Yearly) 0 0.72 0
3 Hot Axle (Yearly) 0 0 0
4 Enroute detachment of Wagon
(Yearly) 0 0.72 0
5 ROH Outturn (Avg. per month) 1071 1350 1408
6 Weak Brake Power 0 0 0
7 Spring Breakage 0 0 0
8 Journal Breakage 0 0 0
9
Charges for wagon damages
during load/unloading in
siding.
657566 - 291863
10 i Examination of
Rake
Pre 499 0 667
ii ETE 857 0 659
Page no. 82
SN
ITEM
Actual
for
2013-
14
(Apr-
Dec)
target
for
2014-
15
(Apr-
Dec)
Actual
for
2014-
15
(Apr-
Dec)
iii CC 222 216 211
iv Total 1578 216 1537
11 Sick line Attention (VUs) 4098 0 4369
NEW TRAINS WERE INTRODUCED AS PER HON’BLE MR’S BUDGET
SPEECH 2014-15.
SL. No
Train No.
Train name PM depot
Other end
Days of run/dep. Time
Date of Introduction
1 13119 SDAH-DLI
Exp. SDAH DLI
Bi-weekly (Thu & Sun)/21:15 hrs. 06/07/14
INCREASE OF DESTINATION SL. No
Train No.
Train name PM depot
Change of destination
1 13137 BP-Azamgarh Exp KOAA BP to KOAA INCREASE OF FREQUENCY
SL. No
Train No.
Train name PM depot Increase of Frequency
1 13187 SDAH-RPH Exp SDAH 6 days to daily
NEW TRAINS
SL. No
Train No.
Train name PM depot
Other end
Days of run/dep. Time
1 22213 SDAH-Katra weekly Premium Express
SDAH Katra Weekly(Sat)/ 15:20 hrs.
2 22215 SDAH-JU Bi-weekly Premium Express
SDAH JU Bi-weekly(Tue & Fri)/18:30 hrs.
NOTABLE ACHIEVEMENTS DURING THE YEAR
Running of Special trains & additional coaches : From Apr’14 to Dec’14, division had run 127 trips of Special trains with
1829 Nos. coaches to cope up with the heavy rush. In addition the division
has also attached 111 Nos. LHB coaches, 454 AC coaches & 525 Nos. Non-
AC coaches extra to clear long waiting list during summer, Puja festivals &
winter seasons.
Swachchhata Abhiyan at work place :
Page no. 83
A Special cleanliness drive had been started at all Railway Carriage & Wagon
Depot under Sealdah Division on October 2, the birth anniversary of
Mahatma Gandhi. In this regard, a "Swachhta Shapath" has been taken by
the all Officers, Supervisors and staffs, followed by cleanliness drive. On that
day CME/ER also visited Sealdah Coaching depot, took cleaning pledge
along with depot staff & participated in cleanliness drive. He is also guided
the present supervisor & staff by giving motivational & inspirational speech.
Improvement in Linen Management system : A number of action plan taken to improve the quality of linen supplied
in the train. The result is very encouraging as number of passenger
complaints has been reduced from 95 cases of 2013-14 (upto Dec) to 33
cases of 2014-15 (upto Dec) so far.
Up-gradation of First Class AC Coach of SDAH Rajdhani / Duranto Express : Following activities are done by the in house manpower & materials in
Sealdah Coaching depot for up gradation inside the First Class AC
Coach for high profile passenger satisfaction.
� Some backlit photographs of Kolkata historical places & eminent personalities like Vivekananda, Tagore etc. are displayed in Corridor and inside coupes.
� Some passenger amenities fittings have been replaced with upgraded injury free fittings.
� PU painting with aesthetic colour scheme done inside Corridor, coupes and lavatory area.
� Long door mats have been provided in gangway covering corridor area.
� Intensive cleaning of all coaches including Pantry Cars done. � Monthly schedule of intensive cleaning started forming new
dedicated batches. � Retro-reflective stickers have been provided in place of painted berth
No.
Page no. 84
Freight Hot axle cases : There is no case of hot axle in wagons in last two years.
Position of POH/IOH overdue : At present no coaches are running with overdue POH/IOH.
ROH Performance : ROH of wagons is being done by Sealdah division @ 156 V.U. per month
against target 150 V.U. per month. In 2013-14, ROH done was 126 V.U.
per month.
Introduction of Indo-Bangladesh Maitree Express(Frequency increased to 2 days to 3 days) : As per order of Rly.Board, frequency of Indo-Bangladesh Maitree
Express has increased by tri-weekly instead of bi-weekly which has
inaugurated by DRM/SDAH on 04-01-2015.
Billing system of Damage & deficiency of BDR train converted into computerized. Manual billing system of damage & deficiency of BDR train has been
converted into computerized system which helps manpower saving,
accuracy of bill preparation and monitoring of billing.
SYSTEM IMPROVEMENT IDENTIFIED & IMPLEMENTED
Set up of bio-toilet Laboratory : A bio-toilet effluent testing laboratory has been set up in coaching
depot, Sealdah on 13/08/2014 to test the condition of effluent to
ascertain the health of bio-digester tank. 4 out of 6 stipulated tests are
being conducted and one round testing of 351 nos. tanks out of 402
tanks completed. Result of test found within the prescribed range for all
tanks.
Started 3rd shift at Majerhat BLC Terminal : At Majerhat CONCOR Terminal there were only 2 shifts running. There
was demand for night shift to avoid detention of loads. Night shift
working started w.e.f. 02/06/2014 with 100% in-house resources
resulting in huge saving of detention time. Average 8 to 10 rakes are
being examined & 6 to 8 loads are being dispatched in night shift
(about 1/3rd of the total load).
Supply of blanket sleeves in Rajdhani & Duronto :
Page no. 85
Separate blanket covers for up & down trips are being provided to 1st
AC passengers of Rajdhani & Duronto Express. This has enhanced the
passenger satisfaction and acceptance level.
Provision of passenger amenities in toilets in Rajdhani & Duronto : A number of passenger amenities like foam type liquid soap dispenser,
Tissue paper dispenser, Hand towel dispenser, personal seat cover
dispenser & back push shower have been provided in toilets of
Rajdhani & Duronoto coaches. This has improved hygiene up to great
extent.
Mechanised Laundry & Linen performance : Linen supplied by Mechanised Laundry is 100% washed, ironed and
stain free. There is no passenger complaint on this account.
II) Assistance Required:
a. Early finalization of Mechanised Laundry augmentation case at HQ. b. Tender of BOOT laundry opened on 30/12/14, under BNTS
verification, to be finalized by HQ on top priority, this will cater 100% linen requirement of Sealdah division.
c. Requirement of 14 + 23 Nos. GSCN coaches against shortage & condemnation.
d. Expedite early completion of construction works in Sealdah coaching depot area.
e. Crisis of some Coaching & Goods items.
Item PL No MC F/
Depot
Last three month supply
Oct Nov Dec
A. COACHING "K" type brake block 30316121 4500 HWH 2300 2000 2050
FRP Glass Window Shutter 30547090 130 HWH 0 0 0
Push Type Flushing Valve 30676794 300 HWH 10 30 20
Frosted glass for lavatory 30557124 75 HWH 0 0 0
B. GOODS Polymer Pad For Side Bearer Assembly For HS Bogie
38106474 97 HWH 0 0 0
Bolster liner 38106371 500 HWH 100 0 80
Bogie centre pivot casting bottom for BOXN/BCN.
38106334 12 HWH 10 0 5
Side Frame Friction Liner 38106383 590 HWH 275 0 50
f. Crisis of Linen item (Polyvastra)
Item PL No
Demand (including
pending quantity of 12-13 & 13-14)
Supply (upto
Dec’14)
Short-fall
% of Short-
fall
Bed Sheet (Polyvastra) KVIC-II
79337041 143861 57118 86743 40%
Pillow Sleeve small (Polyvastra) KVIC-II
79336656 166088 74475 91613 45%
g. Sanction of new works for Coaching maintenance :
Page no. 86
A proposal for Extension & renovation of ART office with pathway, renovation of coaching maintenance line with pathway, Coach watering facility for round trip maintenance on Platform No. 3 & New building of SSE(C&W)/IC/RHA office at RHA in Plan Head -42 has been sent for sanction in 2014-15, cost Rs. 99 Lakh, the same may be sanctioned on priority.
SANCTION STRENGTH / MAN ON ROLL
COACHING
Name
of
depot
Supervisor Group “C” Group “D”
Sanc OR Vac Sanc OR Vac Sanc OR Vac
SDAH 112 84 28 852 600 252 412 331 81
KOAA 50 32 18 455 268 201 148 268 -106
RHA 6 4 2 30 19 11 0 0 0
KRP 3 4 -1 22 21 1 14 16 -2
Total 171 124 47 1359 894 465 574 601 -27
N.B. Including 4 supervisors on deputation. Excluding ministerial staff.
FREIGHT
Name of
depot
Supervisor Group “C” Group “D”
Sanc OR Vac Sanc OR Vac Sanc OR Vac
CP 12 9 3 161 93 62 62 22 10
NH 36 26 10 280 205 75 64 153 -89 BGB+MJT 12 6 6 72 41 31 22 23 -1
RHA 6 4 2 38 25 13 20 30 -10
Total 66 43 21 747 370 181 168 258 -90
OTHERS
Name of
depot
Supervisor Group “C” Group “D”
Sanc OR Vac Sanc OR Vac Sanc OR Vac
CWI 9 8 1 0 0 0 0 0 0
MW 0 0 0 11 14 -3 4 2 2
Total 9 8 1 11 14 -3 4 2 2
COACH MAINTENANCE POINTS & EXTENT OF ACTIVITY
i. Sealdah Coaching Depot
It is a mega coaching depot maintaining Duronto & Rajdhani Express with LHB coaches Thirty two (32) pairs of conventional trains. Mechanized Laundry at Sealdah of 2 Ton per shift capacity started its functioning on & from 04/04/2011 with two shifts.
ii. Kolkata Coaching
This depot deals with both Coaching & wagon. The Kolkata Terminal was opened on 30/01/2006. Thirty two (32)
Page no. 87
Terminal trains are being maintained at present of which Twenty (20) are given primary maintenance, Seven (7) are turnaround & Five (5) Secondary maintenance trains. Coach holding of depot is about 394 coaches.
iii. Ranaghat C&W Depot
Billing of Bangladesh bound traffic is done here through TXR Observer of BDR posted at RHA. Turn around maintenance of divisional 3 passenger trains (53151,
53153, 53155). ‘B’ class ART & ARMV is also stationed here under the control of C&W depot.
iv. Krishnapur Coaching Depot
turn around maintenance of 03 Mail/Express & 09 Passenger trains terminating at LGL done here.
COACHING ACTIVITY
Sealdah Division Primary Maintenance
Secondary maintenance
Turn Around maintenance
Total
Total train 50 4 10 64 Rajdhani 1 0 0 1 Duronto 2 0 0 2 Indo-Bandesh 1 1 0 2 Garib Rath 1 0 1 2 Mail/Express 36 3 9 48 Passenger 8 0 0 8 DEMU 1 0 0 1
WAGON MAINTENANCE POINTS & EXTENT OF ACTIVITY
1 Chitpur Freight Depot
This depot also caters Goods activity such as examination of C.C., Premium & End to End including sick line repair.
2 Naihati Freight Depot
This depot deals only with Freight Stock such as Intensive examination of C.C., Premium & End to End, sick line repair, examination & repair of BDR trains and ROH. Condemnation of C&W stock done at RE Siding/Naihati.
3 Ranaghat Freight Depot
Mainly dealing with billing of damage & deficiency for BDR trains via DSN and via Petrapole/Benapole including custom clearance.
4 Budge Budge Freight Depot
This depot mainly deals with loading fitness for vegetable oil of BTPN wagons. MJT depot under the control of BGB/C&W depot maintains CC & ETE examination & repair work of BLC & BFKHN rakes of CONCOR. Three shifts of work at MJT depot have been started for which detention is saved.
INSPECTION AREA’S DEPOT PERFORMANCE
RANAGHAT
Ranaghat Depot is 73 Km away from Divisional Office and deals with Goods and Coaching Stock. Billing & examination of Bangladesh wagons and custom clearance of
Bangladesh trains are done at Ranaghat where one Bangladesh observer is
posted.
Page no. 88
Three (3) Passenger trains plying in between RHA-LGL section round trip
maintenance done in Ranaghat depot.
SALIENT FEATURES OF RANAGHAT DEPOT
ART “B” Class ARME Available Average monthly trains inter changed with BDR (UP) 16 trains Average monthly trains inter changed with BDR (DN) 23 trains Average monthly trains inter changed via BEN (UP) 1 train Average monthly trains inter changed via BEN (DN) 1 train Average monthly trains inter changed via DSN (UP) 17 trains Average monthly trains inter changed via DSN (DN) 22 trains Total staff (including ART) 89 Turn round attention to coaches 3 trains
DEPLOYMENT DETAILS OF ART & ARMV
One “B” Class ART & ARME is provided at RHA Depot which is under
Carriage & Wagon Department. The ART functions over Naihati to Lalgola,
Gede & Ranaghat Bangaon section. The ARTs is equipped with LUCAS Type
Re-railing equipment and other accessories as recommended by High Power
committee. 26 staffs including one supervisor are attached with ART.
BEAT OF ART/ARMV AT RHA
SALIENT FEATURES OF ART / ARMV RHA
Type of ART “B” Class Strength of ART Staff 26 (Supv-1 & Staff -25) Beat of ART RHA-KLYM, RHA-STB, RHA-BNJ, RHA-
GXD, RHA-LGL Beat of ARME RHA-NH, RHA-KLYM, RHA-STB, RHA-
BNJ, RHA-GXD, RHA-LGL. Maximum Beat 153.71 KM (RHA-LGL) Hydraulic Re-railing Equipment 2 Nos. Lucas type, Petrol Engine Diesel Generating Set 12 KVA Exit type Double exit
RHA
KNJ
STB
GXD
BNJ
NH
LGL
Page no. 89
Maximum Permissible Speed of ART/ARMV
110 KMPH Fitness excluding Freight Stock.
Cold Cutter One. Maintenance Pathway Concrete Pathway at ART/ARME siding Other facility available Video Camera, Digital Camera, Mobile
Sim, Wrist Bands, Fluorescent vest, Foldable ladder, Shamiyana, Nylon Water proof Tent etc.
REGISTER UNDER ART/ARMV RHA
• Daily staff deployment register.
• Derailment Log Book register.
• Disaster management equipment register.
• Standard material list for ART/ARMV register.
• Testing Schedule register (Disaster management items)
• Departmental Inspection register
• Officers Inspection register (ART & ARMV)
• Inspector Inspection register
• Water register for ARMV
• ART/ARMV Call register.
COMPOSITION OF ART/RHA
Sl. No.
Coach No. Type POH Date R/Date Present utilization
1. ER 858994 RT KPA 24/05/14
01/2018 C&W Material loaded & Generator Car
2. ER 228 RT KPA 16/01/14
06/2017 Staff Car
3. ER 88891 RT KPA 23/07/11
03/2015 HRE Van
4. ER 88889 RT KPA 07/11/14
06/2018 C&W Material loaded.
5. SEC 94141289752
BRNAHS TWL 01/04/12
04/2018 P.Way & TRD Material loaded
6. SE 108948 BCNAHS JMP 24/10/11
10/2017 P.Way Material loaded
COMPOSITION OF ARMV/RHA
Sl.
No.
Coach
No.
Type POH Date R/Date Present utilization
1. ER 320 RHV KPA 11/02/13 09/2016 Medical Auxiliary Van
2. ER 618 RH KPA 19/04/14 12/2017 Medical Van
Page no. 90
ORGANIZATION CHART
SRI U. K.PANDEY Sr.DME
R. Sur AME/C&W-II/SDAH
P.N.Moitra CDO/SDAH
Sri N.K.Prasad DME/Proj
HQ SDAH
CP
COS/C&W SSE/IC
K.Bhattacharyay AME/C&W-I/NH
RHA NH
SSE/IC SSE/IC
SSE/IC
Sri P. Roy CDO/DME/NCC
A.Ghani AME/C&W/SDAH
BGB
SSE/IC
Page no. 91
MECHANICAL/ D & P
PERFORMANCE:
� Upto Yearly Schedule of WDS-6R are being carried out successfully.
� In all the WDS-6R locos of BGA Shed, almost all type of V-Belt Safety Guard and
Expressor Fan Guard were fitted.
� Audit and Stock sheet is NIL.
� 100% Mileage bill of Crew at SDAH Crew Booking Lobby have been prepared
through CMS.
� Rs. 2.38 Crores have been realized against Hire charges of Engine, ART & 140 Ton
BD Crane. up to the month of Dec’14
� Air Brake Test Bench Installed and Commissioned during this year.
� 1347.984 KL HSD Oil, Money value Rs. 8,63,95,073.57 has been saved through
shutdown.
� Modernization of “A” Class ART and 140 Ton BD Crane has been carried out as per
HLC’s Recommendation.
� Earlier DM water were purchased used for topping up in coolant purpose in
locos. A newly in-house installed and commissioned RO plant brought
independency over previous system of regular purchasing of costly DM water
from outside agency.
� 21 nos. WDS6R locos have been fitted with EPG successfully out of 27 locos.
� 14 nos. WDS6R locos have been fitted with two bolt Angle Cock successfully
out of 27 locos.
� 24 nos. WDS6R locos have been fitted with Expressor Gear Pump successfully
out of 27 locos
� Rescue Platform
In case of heavy accident when passenger coaches are involved, cutting operation of
coaches are required for rescue/ restoration of the affected passengers from a height.
In that cases Rescue Platform works safely and smoothly. Mech(Power) wing of
Sealdah Division has innovate this unique rescue device by utilizing existing
resources and manpower.
� Lighting on Derrick Drum of 140T BD Crane during operation at night.
Page no. 92
During crane operation at night, need of illumination over Derrick Drum was felt to
avoid improper entanglement of Derrick Wire Rope. Light has been provided over
Derrick Drum to facilitate proper watching and avoiding danger of entanglement of
Derrick Wire Rope.
10 Hrs. position of Mail/Exp. & Passenger(Average of last 3 months)
10 Hrs. position of Goods Services(Average of last 3 months)
Comparative analysis of Bangladesh Services during 13-14 & 14-15
Month/ Year
Total No. of Trips
Within 10 hrs. (S/on – S/Off)
10 to 12 Hrs. (S/on – S/Off)
12 to 13 Hrs. (S/on – S/Off)
Above 13 hrs. (S/on – S/Off)
Within 10 Hrs.
(Dep. – Off)
Trips % Trips % Trips % Trips % Trips %
Mail/Exp. & Passenger Services :
2013-14 (Oct to Dce’13)
921.66 903.33 98.01 17.66 1.92 0.33 0.03 0.33 0.03 914 99.17
2014-15 (Oct to Dec’14)
892 868.66 97.38 21.66 2.43 1.33 0.15 0.66 0.07 858 96.19
Month/ Year
Total No. of Trips
Within 10 hrs. (S/on – S/Off)
10 to 12 Hrs. (S/on – S/Off)
12 to 13 Hrs. (S/on
– S/Off)
Above 13 hrs. (S/on –
S/Off)
Within 10 Hrs. (Dep. – Off)
Trips % Trips % Trips % Trips % Trips %
Goods Services :
2013-14 (Oct to Dce’13)
3449.33 2510 72.77 691 20.03 65 1.88 116.66 3.38 3200 92.77
2014-15 (Oct to Dec’14)
3534.33 2874.33 81.33 620.33 17.55 25.66 0.72 13 0.36 3388.33 95.87
2013-14 (UPTO Dec’2013)
2014-15 (UPTO Dec’14)
RD/DR BP/PB Total RD/DR BP/PB Total
210/210 06/06 216/216 225/225 12/12 237/237
Page no. 93
HSD OIL ISSUED TO FOREIGN LOCOS AND CORRESPONDING
MONEY VALUE & TS ACCEPTED
HIRE CHARGES AGAINST ART/DSL LOCOS/ 140T B.D. CRANE
FROM PRIVATE PARTIES
2013-14 ( up to Dec’13)
2014-15 (Upto Dec’14)
Qty. Issued (KL)
Money Value (in Rs.)
TS accepted (up to Dec’14)
Qty. Issued (KL)
Money Value (in Rs.)
TS accepted (upto Dec’14)
507.75 3,18,76,957.00 3,18,76,957.00 508.695 3,23,09,686.00 3,23,09,686.00
Items 2013-14 (in Rs.)
20114-15 Amount (Upto Oct’13)
(in Rs.) Raised Realized Raised Realized
Engine Hire Charges
5,67,35,930.00 5,67,35,930.00 3,15,27,120.00 2,28,74,880.00
ART Hire Charges
26,41,520.00 17,63,437.00 10,73,346.00 9,60,683.00
Crane Hire Charges
- - - -
Total 5,93,77,450.00 5,84,99,367.00 3,26,00,466.00 2,38,35,563.00
TRAINING PARTICULARS OF RUNNING STAFF
YEAR GR/SR TECHNICAL SAFETY CAMP
OTHERS GRAND TOTAL
2013-14
( up to Dec’13)
103 77 100
Simulator = 78 (Air Brake + DEMU +
Promotional) = 09 367
Total = 87
2014-15 ( up to Dec’14)
59 106 59
Simulator = 57 (Air Brake + DEMU +
Promotional) = 12 293
Total = 69
Page no. 94
PERFORMANCE – DIESEL & POWER/SDAH
Sl No.
Target (up to Dec’14)
Actual up to Dec’13
Actual up to Dec’14
Remarks / Assistance required from Board
1. Punctuality loss / 100 loco / month (Direct)
9.6 0 0
2. Equipment failure / 100 loco / month
5.5 0 0
3. Diesel loco utilisation ( Engine Km. / Day)
328 325 325
4. Specific Fuel Consumption in Lts / 1000 GTKM ( Pass)
4.87 3.67 3.56
5. Specific Fuel Consumption in Lts / 1000 GTKM ( Goods)
2.16 1.96 2.00
6. Lub Oil consumption / 100 EKM. ( in Lts.)
1.35 1.38 1.36
Assistance required :-
i) Due to acute crisis of Assistant Loco Pilot (ALP), this division is facing difficulties in operation of diesel hauled trains. 116 nos. of posts of ALP(Dsl) are lying vacant. This should be filled up at the earliest for smooth operation of train services.
ii) 145 nos. Walkie Talkie are under procurement vide Reqn. No. 231100672 dt 10.05.2011 and Tender Case No. 14/12/6076 at Head Quarter.
Page no. 95
MEDICAL
I) PERFORMANCE:
ACTIVITIES AND HIGHLIGHTS OF ACHIEVEMENT for the period Jan,14 to Dec,14 Sl no. Subject Jan,13 to
Dec,13 Jan,14 to Dec,14
1 Indoor admission 15317 16052 2 OPD attendance( Average daily) 545292 474265 3 Preventive Health checkup ( Employees) 2246 3784 4 Operation ( Major) 3986 4819 5 Operation ( Minor) 3698 4530 6 Man days lost due to PMC 148125 143322 7 Man days lost due to RMC 48394 59855
8 Medical examination
PME 1798 1813
Candidate 2377 2316
9 Modernized blood bank with 24 hours supply 10 Advanced pathology and bio chemistry department 11 Highest no. of pace makers implantations in cardiology 12 Pain clinic 13 Laser & Phaco surgery in Ophthalmology 14 Advanced works in Urosurgery 15 Advanced work in Gastroenterology, Endocrinology, Rheumatology,
Neurology, Botax Therapy 16 Advance work in Laparoscopic, Gynaecology 17 Regular CME among doctors 18 Training of paramedical staff in infection control &
behavioural improvement
19 Bio-medical waste disposal as per standard
Page no. 96
Water sample analysis return of SDAH division for the year 2013 – 14 & 2014-15
Quality Control analysis report of SDAH division for the year 2013-14 & 2014-15
MONTH
BACTERIOLOGICAL OF TAP WATER
BACTERIOLOGICAL OF PACKAGE DRINKING WATER
RESIDUAL CHLORINE OF TAP WATER
COLLECTED FIT COLLECTED FIT COLLECTED
FIT
13-14 14-15 13-14 14-15 13-14 14-15 13-14 14-15 13-14 14-15 13-14 14-15
APR 66 84 46 40 07 06 07 06 1216 1459 301 474
MAY 87 98 54 75 06 08 06 08 1402 1351 379 709
JUNE
65 85 38 60 07 05 07 04 1032 1626 344 966
JULY 83 124 66 103 06 12 06 07 1299 1493 366 635
AUG 66 106 62 82 07 10 07 10 1300 1610 201 637
SEPT 78 135 76 120 07 07 07 07 1343 1586 353 830
OCT 76 102 69 95 08 21 08 10 1278 1502 406 894
NOV 82 106 75 106 06 15 06 07 1111 1549 451 613
DEC 81 102 72 88 09 04 09 03 1351 1580 533 636
JAN 112 100 13 13 1628 736
FEB 103 96 12 12 1727 660
MAR 91 84 09 09 1408 635
TOTAL
990 938 838 (79%)
769(81.98%
)
97 88 97(100%)
62(70.45%)
16095 13756 5365(26%)
6394 (46.48%)
MONTH No of food samples collected for Quality Control
No of food samples FIT after Quality Control Analysis
No of food samples UNFIT after Quality Control Analysis
13-14 14-15 13-14 14-15 13-14 14-15
APR 47 51 47 51 MAY 40 49 40 49
JUNE 51 53 51 53 JULY 43 52 43 52
AUGUST 43 53 43 53 SEP 37 54 37 54
OCT 35 50 35 50 NOV 36 54 36 54
DEC 35 58 35 58 JAN 45 45
FEB 55 55 MARCH 55 55
TOTAL 522 474 522 474
Page no. 97
FSSA report of SDAH division for the year 2014 -15
WATER SAMPLE TESTING RESULT OF RANAHAT JURISCITION AREA FROM JAN,14 TO DEC, 14
Mon
th
Nam
e o
f th
e
sta
tion
No. O
f sam
ple
collecte
d for
RC
L
Sati
sfa
cto
ry
Un
sati
sfa
cto
ry
No. O
f sam
ple
collecte
d for
Fit
Un
fit
R/A
Jan RHA Stn & Col
112 Nil 112 04 04 - -
Feb -do- 114 Nil 114 05 04 01 -
Mar -do- 104 Nil 104 05 05 - -
Apr -do- 114 Nil 114 03 03 - -
May -do- 106 Nil 106 04 03 01 -
Jun -do- 116 Nil 116 03 03 - -
Jul -do- 110 Nil 110 06 06 - -
Aug -do- 114 10 104 04 04 - -
Sep -do- 116 22 94 03 03 - -
Oct -do- 110 20 90 04 04 - -
MONTH No of food samples collected under FSSA,06
No of food samples FIT
No of food samples UNFIT
13-14 14-15 13-14 14-15 13-14 14-15 JAN 02 08 02 05 Nil 03 FEB 02 06 01 05 01 01 MAR 03 06 03 05 Nil 01
APR Nil 07 Nil 01 Nil 06 MAY Nil 06 Nil 05 Nil 01
JUNE 03 07 03 04 Nil 03 JULY 03 07 01 06 02 01
AUG 07 07 06 07 01 Nil SEP 07 07 05 06 02 01
OCT 06 06 06 06 Nil Nil NOV 09 07 09 Awaited Nil Awaited DEC 07 08 04 Awaited 03 Awaited TOTAL 49 82 40 50 09 17
Page no. 98
Nov -do- 114 08 106 03 03 - -
Dec -do- 108 18 90 05 05 - -
Total 1338 78 1260 49 47 02
BABY SHOW AT AUDITORIUM/BRSH ON 14.11.2014
Measurement of Weight
Examination of Child for Baby Show on 14.11.14
Mrs. Jaya Verma Sinha DRM/SDAH presenting a gift to a baby show participant
Page no. 99
MULTIPURPOSE HEALTH DRIVE CAMP AT RANAGHAT
Chief Medical Director along with Medical director
Registration of beneficiaries
Page no. 100
Baby show prize distribution
MULTIPURPOSE HEALTH DRIVE CAMP AT GEDE JOINTLY ORGANIZED BY CSBF
AND MEDICAL DEPARTMENT
Release of health education booklet
Gynaecological check up
Page no. 101
Paediatrics check up
GHOLSAPUR HEALTH UNIT
1. Name & grade of the health unit GHPR H/Unit 2. Jurisdiction GHPR Rly Col, NAP Rly Col, Rail Minar,
BLVD park Rly col 3. No. of station Nil 4. No. of employee in the jurisdiction 186 5. No. of Lockup dispensary 03 6. Total medical card registered
Employee RELHS
247 05
7. Facilities available ECG: 01
Glucometer: 03 Nebuliser: 01 Suction Machine: 02 Oxygen cylinder: 02 8. Staff strength Health unit Sanctioned
strength On roll
a) Doctor : 01 01 b) Pharmacists: 01 01 c) N/ staff: Nil Nil d) O.T. asst.: 01 Vacant e) HA 02 02 f) Safaiwala: 01 01 g) X-Ray Tech; Nil Nil h) Ayah: Nil Nil
Conservancy Sanctioned strength
On roll
a) H & MI: 01 01 b) Safaiwala: 09 08 Nos of Rly colony 04 Nos of quarters 554, Out house- 190
System of removal of garbage Colony Station
Page no. 102
Contractual Nil Cleaning system of station/ colony
Colony Station
Mechanized Mechanized Nil Manual Mechanized Nil System of sewage disposal of colony septic tank/ corporation sewer line and year of desludging of septic tank.
Through outsource agency
Imprest money HU - ` 1000/- 9. No. & type of ARME POMKA-01 10. Family welfare data Immunisation clinic: NIL Antenatal Clinic: NIL Health education and awareness programme for Rly population :
01/Month
Pulse polio programme: As per schedule
NAIHATI HEALTH UNIT
1. Name & grade of the health unit NH H/Unit (Gr-I)
2. Jurisdiction NH to BNXR
3. No. of station 14
4. No. of employee in the jurisdiction 2970
5. No. of Lockup dispensary 01( Barrackpore)
6. Total medical card registered
Employee RELHS
5863 759
7. Facilities available
ECG: Done regularly
Glucometer: Regular checkup of Blood Sugar
Nebuliser: Used in Emergency cases
Suction Machine: Used in Emergency cases
Oxygen cylinder: Used in Emergency cases
8. Staff strength Health unit Sanctioned strength On roll
a) Doctor : 03 03
b) Pharmacists: 01 01
c) N/ staff: 01 01
d) O.T. asst.: 01 01
e) HA 05 03
f) Safaiwala: 01 01
g) X-Ray Tech; 01 01
h) Ayah: 01 01
Conservancy Sanctioned strength On roll
a) H & MI: 02 02
b) Safaiwala: 45 45
Nos of Rly colony 04
Nos of quarters 1239
System of removal of garbage Colony Station
Contractual Contractual
Cleaning system of station/ colony
Colony Station
Mechanized Nil Mechanized
Manual Manual Manual
Page no. 103
System of sewage disposal of colony septic tank/ corporation sewer line and year of desludging of septic tank.
Through contractual agency
Imprest money HU – Rs. 5000/- HI/NH- Rs. 1000/-
9. No. & type of ARME 1, Scale -II
10. Family welfare data
Immunisation clinic: Bi weekly
Antenatal Clinic: Once in week
Health education and awareness programme for Rly population :
Conducted regularly School health programme conducted once in a year
Pulse polio programme: Conducted as per directive
Multipurpose Health Drive programme Organized once in a year
11. Details of water sample, Food sample for quality control test and PFA in the jurisdiction
A. (i) Water sample tested for Bacteriological Test- 74 Nos from Jan,14 to Dec, 14 (ii) No. of samples found unsatisfactory - 14 Nos B. (i) Water samples tested for Residual Chlorine – 1624 Nos form Jan,14 to Dec 14 (ii) No. of samples found unsatisfactory - 563 Nos C. Food Samples for Quality Control Test – 56 Nos all satisfactory
NARKELDANGA HEALTH UNIT
1. Name & grade of the health unit Narkeldanga H/Unit (Gr-II)
2. Jurisdiction SDAH Khal to KGK Cabin 1.75 km
3. No. of station 01
4. No. of employee in the jurisdiction 1644
5. No. of Lockup dispensary Nil
6. Total medical card registered
Employee RELHS
1843 10
7. Facilities available
ECG: Nil
Glucometer: Available
Nebuliser: Nil
Suction Machine: Available
Oxygen cylinder: Available
8. Staff strength Health unit Sanctioned strength On roll
a) Doctor : 01 01
b) Pharmacists: 01 01
c) N/ staff: Nil Nil
d) O.T. asst.: 01 01
e) HA 02 02
f) Safaiwala: 01 01
g) X-Ray Tech; Nil Nil
h) Ayah: Nil Nil
Conservancy Sanctioned strength On roll
a) H & MI: Nil Nil
b) Safaiwala: Nil Nil
Nos of Rly colony 02
Nos of quarters 800
System of removal of garbage Colony Station
Contractual Contractual under TI/DDJ
Cleaning system of station/ colony
Colony Station
Mechanized Nil nil
Page no. 104
Manual Manual Manual
System of sewage disposal of colony septic tank/ corporation sewer line and year of desludging of septic tank.
Through contractual agency
Imprest money HU - ` 1000/-
9. No. & type of ARME POMKA- 1
10. Family welfare data
Immunization clinic: Nil
Antenatal Clinic: Nil
Health education and awareness programme for Rly population :
Yes
Pulse polio programme: Yes
Multipurpose Health Drive programme Nil
Health Check up of Rly employees done Yes
CHITPUR HEALTH UNIT
1. Name & grade of the health unit CP H/Unit (Gr-II)
2. Jurisdiction Chitpore & Cossipore
3. No. of station 03
4. No. of employee in the jurisdiction 876
5. No. of Lockup dispensary 01
6. Total medical card registered
Employee RELHS
792 02
7. Facilities available
ECG: Available
Glucometer: Available
Nebuliser: Available
Suction Machine: Available
Oxygen cylinder: Available
8. Staff strength Health unit Sanctioned strength On roll
a) Doctor : 01 01
b) Pharmacists: 01 01
c) N/ staff: 01 01
d) O.T. asst.: Nil Nil
e) HA 02 02
f) Safaiwala: 01 01
g) X-Ray Tech; Nil Nil
h) Ayah: Nil Nil
Conservancy Sanctioned strength On roll
a) H & MI: 01 01
b) Safaiwala: 37 DAKE-12 20 DAKE-05
Nos of Rly colony 03 Nos of quarters 587
System of removal of garbage Colony Station
Contractual Contractual
Cleaning system of station/ colony
Colony Station
Mechanized Nil Mechanized
Manual Manual Nil
System of sewage disposal of colony septic tank/ corporation sewer line and year of desludging of septic tank.
Through contractual agency
Page no. 105
Imprest money HU - ` 1000/-
9. No. & type of ARME Nil
10. Family welfare data
Immunisation clinic: 2nd Wednesday of the month
Antenatal Clinic: Every Thursday
Health education and awareness programme for Rly population :
Every month
Pulse polio programme: Yes
Multipurpose Health Drive programme Nil
Health Check up of Rly employees done Yes
KOILAGHAT HEALTH UNIT
1. Name & grade of the health unit Koilaghat H/Unit (Gr-II)
2. Jurisdiction New KG & KG
3. No. of station Nil
4. No. of employee in the jurisdiction 3400 Aprox
5. No. of Lockup dispensary Nil
6. Total medical card registered
Employee RELHS
2338 Nil
7. Facilities available
ECG: Available
Glucometer: Available
Nebuliser: Available
Suction Machine: Available
Oxygen cylinder: Available
8. Staff strength Health unit Sanctioned strength On roll
a) Doctor : 01 01
b) Pharmacists: 01 01
c) N/ staff: Nil
d) O.T. asst.: 01 01
e) HA 01 01
f) Safaiwala: 01 01
g) X-Ray Tech; Nil
h) Ayah: Nil
Conservancy Sanctioned strength On roll
a) H & MI: 02 02
b) Safaiwala: 106 56
Nos of Rly colony Nil
Nos of quarters 10
System of removal of garbage Office Station Nil
Cleaning system of station/ colony
Office Station
Mechanized Nil -
Manual Manual Nil
System of sewage disposal of colony septic tank/ corporation sewer line and year of dislodging of septic tank.
Imprest money HU – Rs.5000/-
9. No. & type of ARME POMKA
10. Family welfare data
Immunisation clinic: Typhoid vaccine to Canteen staff
Antenatal Clinic: Every Wednesday
Health education and awareness programme for Rly population :
As 7 when required
Page no. 106
Pulse polio programme: As advised
KAMARDANGA HEALTH UNIT
1. Name & grade of the health unit Kamardanga H. Unit Gr- II
2. Jurisdiction Kamardanga
3. No. of station Nil
4. No. of employee in the jurisdiction 946
5. No. of Lockup dispensary nil
6. Total medical card registered
Employee RELHS
946 nil
7. Facilities available
ECG: Not available
Glucometer: Not available
Nebuliser: Not available
Suction Machine: Not available
Oxygen cylinder: Not available
8. Staff strength Health unit Sanctioned strength On roll
a) Doctor : 01 01
b) Pharmacists: 01 01
c) N/ staff: Nil Nil
d) O.T. asst.: 01 Nil
e) HA 02 02
f) Safaiwala: 01 01
g) X-Ray Tech; Nil Nil h) Ayah: Nil Nil
Conservancy Sanctioned strength On roll
a) H & MI: Nil Nil
b) Safaiwala:
Nos of Rly colony 01
Nos of quarters 504
System of removal of garbage Colony Station
Contractual Nil
Cleaning system of station/ colony
Colony Station
Mechanized Nil Nil
Manual Manual Nil
System of sewage disposal of colony septic tank/ corporation sewer line and year of desludging of septic tank.
Through contractual agency
Imprest money Rs. 1000/-
9. No. & type of ARME Nil. However one POMKA available
10. Family welfare data
Immunisation clinic:
Antenatal Clinic:
Health education and awareness programme for Rly population :
As per programme initiated by Sr DMO/ H &FW/SDAH
Pulse polio programme: As per schedule
Page no. 107
FAIRLEE PLACE HEALTH UNIT
1. Name & grade of the health unit Fairlee Place H.Unit , Gr- III
2. Jurisdiction Fairlee Place, CPRO Office, CLW/Kolkata office , Station on call Princep Ghat to Burabazar.
3. No. of station Nil
4. No. of employee in the jurisdiction 3000 approx.
5. No. of Lockup dispensary Nil
6. Total medical card registered
Employee RELHS
3696 Nil
7. Facilities available
ECG: Available
Glucometer: Available
Nebuliser: Available
Suction Machine: Available
Oxygen cylinder: Available ( 03)
Ambulance Available
Regular blood collection for path test
Available
Special clinic medicine on Friday 2nd half
Available
8. Staff strength Health unit Sanctioned strength On roll
a) Doctor : 01 01
b) Pharmacists: 01 01
c) N/ staff: Nil 01( Deputed from BRSH)
d) O.T. asst.: 01 01
e) HA 01 01
f) Safaiwala: 01 01
g) Peon 01 Nil
h) Ch. OS Nil 01( Lien from DRM/ASN)
Conservancy Sanctioned strength On roll
a) H & MI:
b) Safaiwala:
Nos of Rly colony
Nos of quarters
System of removal of garbage Office Station
Nil Contractual ( Circular Rly)
Cleaning system of station/ colony
Office Station
Mechanized
Manual Manual Manual
System of sewage disposal of colony septic tank/ corporation sewer line and year of desludging of septic tank.
Imprest money Rs. 30,000/- per month
9. No. & type of ARME POMKA-I
10. Family welfare data
Immunisation clinic:
Antenatal Clinic:
Health education and awareness Yes
Page no. 108
programme for Rly population :
Pulse polio programme:
KRISHANAPUR HEALTH UNIT
1. Name & grade of the health unit Krishanapur H/Unit 2. Jurisdiction Bahadupur to Lalgola 3. No. of station 23( including 05 Halt) 4. No. of employee in the jurisdiction 750 5. No. of Lockup dispensary 01 at BEB 6. Total medical card registered
Employee RELHS
3340 70
7. Facilities available ECG: ECG machine is not functioning and submitted to
BRSH/SDAH Glucometer: Strips are not available , demand is placed Nebuliser: Yes Suction Machine: Yes Oxygen cylinder: Yes 8. Staff strength Health unit Sanctioned
strength On roll
a) Doctor : 01 01 b) Pharmacists: 01 01 c) N/ staff: Nil Nil d) O.T. asst.: 01 Nil e) HA 02 02 f) Safaiwala: 01 01 g) X-Ray Tech; Nil Nil h) Ayah: Nil Nil Conservancy Sanctioned
strength On roll
a) H & MI: Nil Nil b) Safaiwala: 01 01
Nos of Rly colony 18 Nos of quarters 462 System of removal of garbage Office Station
Nil Cleaning system of station/ colony
Office Station
Mechanized Combined system is operating
Manual Manual System of sewage disposal of colony septic tank/ corporation sewer line and year of desludging of septic tank.
Maintained and disposed by IOW/BEB through contractual system
Imprest money Rs. 1000/- 9. No. & type of ARME Scale-II 10. Family welfare data Immunisation clinic: Yes ( Only Pulse polio) Antenatal Clinic: Health education and awareness programme for Rly population :
Yes ( Monthly)
Page no. 109
Pulse polio programme: done
DAKSHINDARY HEALTH UNIT 1. Name & grade of the health unit DKD , GR-II 2. Jurisdiction DKD,PPK,UDA Rly Colony and PPK Stn. 3. No. of station 01(PPK) 4. No. of employee in the jurisdiction 1625 5. No. of Lockup dispensary Nil 6. Total medical card registered
Employee RELHS
3020 09
7. Facilities available ECG: Available
Glucometer: Available Nebuliser: Available Suction Machine: Available Oxygen cylinder: Available 8. Staff strength Health unit Sanctioned
strength On roll
a) Doctor : 01 01 b) Pharmacists: 01 01 c) N/ staff: 01 01 d) O.T. asst.: 01 01 e) HA 02 01 f) Safaiwala: 01 01 g) X-Ray Tech; X X h) Ayah: X X
Conservancy Sanctioned strength
On roll
a) H & MI: 01 01 b) Safaiwala: 58 47 Nos of Rly colony 03 Nos of quarters 1154 System of removal of garbage Station Colony
Contractual Cleaning system of station/ colony
Station Colony
Mechanized Manual Departmental System of sewage disposal of colony septic tank/ corporation sewer line and year of desludging of septic tank.
Imprest money Rs. 1000/- for HU
9. No. & type of ARME 10. Family welfare data Immunisation clinic: Every Wednesday Antenatal Clinic: Every Saturday Health education and awareness programme for Rly population :
As per schedule
Pulse polio programme: As per schedule
Page no. 110
Health Unit
Doctor in charge Jurisdiction Avg OPD attendance /day
Avrg. No of Beneficiaries
Facility available
Spl .facilities Lock-up dispensary
NKG Dr.T.K.Maity ACMS
NKG canal to Kankurghachi cabin NKG car shed, RPF barrack, NKG& MB colony
40 5828 Out pt. Treatment, F&W activity, colony sanitation, public health & health check-up, School Health
ECG, Glucometer Nebuliser
DKD Dr. P.K..Chakraborty ACMS
DKD,Patipukur,Ultadanga Rly colony , CYM, C&W/CP
40 3000 Do ECG, Glucometer Nebuliser
KMD Dr. K.N.Das ACMS
KMD Rly Colony 40 1472 Do ECG, Glucometer Nebuliser
FP Dr. A Sanyal ACMS
FP office 90 16000 Do ECG,Glucometer, Nebuliser
KG Dr.S.Chatterjee ACMS
KG office 84 8000 Do -do-
GHPR +JJC
Dr.S.DasGupta ACMS
GHPR & JJC Rly colony
40 872 Do ECG, Glucometer Nebuliser
NAP
NH Dr.S.K.Mishra, ACMS Dr. S.Saha ADMO Dr. I. Das CMP
NH to BNXR 80 16000 Do X-Ray,ECG, Glucometer Nebuliser
BP
RHA+CRE
Dr S.Lodh Sr. DMO Dr. S.K.Paria ADMO
RHA to Gangnapur, KYI- KNJ, KLNP-STB, KNJ-NDF,STB-KNJ,RHA-Salbagan, new CRE colony.
84 + 40 13000 Do X-Ray ECG Glucometer Nebuliser
Shantipur Krishana Nagar
BT Dr(Mrs) P.Biswas Sr.DMO Dr. K. Mandal ACMS
BT Car Shed & Rly colony ,DDC to HNB
40 5548 Do ECG, Glucometer Nebuliser
BNJ Dr.K.Mandal Sr.DMO
BNJ Rly Colony Bamangachi to Petrapole
15 2384 Do ECG, Glucometer Nebuliser
CP Dr. E.Hansdak Sr.DMO
CP & Kashipur Colony & Kolkata terminal station
40 3400 Do ECG, Glucometer Nebuliser
DAKE
SPR Dr. D.Sengupta Sr.DMO
PQS - DM, BLN- BGB, SPR-CG, BRP - NAMKHANA
50 14000 Do ECG, Glucometer Nebuliser
BGB
KRP Dr.S.K. Sarkar Sr.DMO
LGL TO BAHADURPUR
40 4800 Do ECG, Glucometer Nebuliser
Beldanga
Page no. 111
Divisional Information:
PARTICULAR OF CONSERVANCY CONTRACTUAL WORK OF SDAH DIVN. UNDER MEDICAL DEPARTMENT
Sl No.
Name Name of the contractor
Type of work Value in Rs Contract period
Look after by
01 SDAH M/s Reliable Concrete Corporation 101, Dumdum Cossipore Road ,Kol-74
Mech Cleaning of Concourse, PF & PF- Track & drain, Rag picking from PF end to RRI cabin and mechanized dry cleaning of circulating area at SDAH Stn. ,daily garbage removal work
3,17,18,500 14.10.14 to 13.10.15
Sr. DMO/H&FW/SDAH
02 SDAH Stn & GHPR
M/s Rabi Construction 105, K.K. Adarsha Plally Kol-51
Mechanized cleaning of underground sewer line
72,33,972 24.12.14 to 23.12.16
Sr. DMO/H&FW/SDAH ACMS/GHPR
03 Kolkata Terminal Stn
M/s Y.B.C.L.C.S Ltd.,14/1,Nirode Behari Mullick Road, Kolkata-700 006
Mechanized cleaning, daily garbage removal and Rag picking work
1,40,82,755 29.08.12 to 28.08.15
Sr. DMO/CP
04 SDAH Colony
M/s Rabi Construction 5, Khalisakota Pally Ko-51
Daily garbage removal work and manual cleaning work
68,64,090/- 01.11.13 to 31.10.15
Sr. DMO/H&FW/SDAH
05 SDAH Divn.
M/s Rabi Construction 5, Khalisakota Pally Ko-51
Mechanised de-sludging of septic tanks of SDAH Divn. And mechanized cleaningof underground sewer lines at Sealdah colony area.
TC minutes stage
Sr. DMO/H&FW/SDAH
06 GHPR colony
M/s Reliable Concrete Corporation 63/29/2 DumDum Road, Kol-74
Mannual cleaning of GHPR colony & mechanized cleaning of Swimming pool at GHPR
97,56,750/- 21.03.13 to 20.03.16
ACMS/GHPR
07 GHPR colony & JJC,NAP,BLVD
M/s Rabi Construction 5, Khalisakota Pally Ko-51
Daily garbage removal at GHPR colony area , Mechanized cleaning at JJC, Manual cleaning at NAP & BLVD
81,35,120/- 26.09.13 to 25.09.15
ACMS/GHPR
08 NH stn & colony
Kanta Prasad Gupta, 63( New-119) Nakari Mandal Road, Kanchrapara, 24 pgs (N)
Mechanized cleanin, daily manual cleaning of RRI cabin, Rag picking and daily garbage removal from NH Stn. & colony.
1,37,60,230/-
29.11.13 to 28.11.16
ACMS/NH
09 BNJ Stn & Colony
Dilip Kr Das, Bongaon Rail bazar ,Bangaon 24 pgs (N)
Manual cleaning of Platform, circulating area & service building and PF track, Rag picking and daily garbage removal work.l
15,99,795/- 03.07.13 to 02.07.15
ACMS/BNJ
10 BT Stn M/s Saha & Co, Simlanagar, Agarpara, 24pgs(N)
Mechanized cleaning, Rag picking and daily garbage removal work
74,13,150/- 11.03.13 to 10.03.15
Sr. DMO/BT
11 RHA Stn &
Subha Chakraborty
Daily manual cleaning of PF track, track drains, Rag
56,27,220/- 27.02.13 to
Sr. DMO/RHA
Page no. 112
Sl No.
Name Name of the contractor
Type of work Value in Rs Contract period
Look after by
Colony Dakshinpally , Sodepur ,24 pgs (N)
picking work daily garbage removal work.
26.02.16
12 MGB & NKG Rly. Colony & NCC Yard
M/s Rabi Construction 5, Khalisakota Pally Ko-51
Manual cleaning at NKG & MGB colony and NCC Yard at SDAH Stn.
94,99,670/- 29.11.13 to 28.11.16
Sr. DMO/H&FW/SDAH
13 DKD & PPK Rly. colony
M/s K.M.C Construction, 26/A/H/1, North Sealdah Road, Kolkata-700 009
Daily Garbage Removal work. 13,04,720/- 28.02.12 to 27.02.15
Sr. DMO/DKD
14 CP Yard (New)
M/s S.S.Construction, B/20/7, Kalindi Housing Estate, Kolkata-700 089
Daily cleaning & garbage removal work
51,74,709/- 21.05.12 to 21.05.15
Sr. DMO/CP
15 CP & DAKE Rly. Colony
M/s K.M.C Construction, 26/A/H/1, North Sealdah Road, Kolkata-700 009
Daily Garbage Removal work. 11,79,700/- 21.02.12 to 20.02.15
Sr. DMO/CP
16 SPR Stn & colony
M/s Datta Construction, Khirishtala, Sonarpur , 24 pgs (S) Kolkata- 150
Manual cleaning & Rag picking and daily garbage removal work.
78,69,960/- 11.09.13 to 05.09.15
ACMS/SPR
17 BRSH M/s Reliable Concrete Corporation 63/29/2 DumDum Road, Kol-74
Daily mechanised cleaning of indoor and outdoor of BRSH
61,19,400/- 11.07.13 to 10.07.16
Sr. DMO/H&FW/SDAH
Page no. 113
Remarks
FULL
YEAR
UPTO
DEC
FULL
YEAR
UPTO
DEC
w.r.t
LAST
YEAR
w.r.t
TARGET
A
REV. GOODS
LOADINGMT 2.158 1.622 2.235 1.597 1.553 -4.25 -2.76
Due to less
loading of
jute,stone and
more movement
of empty
container
TOTAL REV
GOODS 8W/
DAY159.0 158.5 152.9 150.6 162.5 2.52 7.90
1
JUTE & JUTE
PRODUCT
LOADING
8W/
DAY22.4 25.5 20.0 20.0 13.8 -45.88 -31.00
Due to less
demand in
market
2CRUDE PALM
OIL LOADING
8W/
DAY21.1 21.6 24.5 13.43
3CONTAINER
LOADING
8W/
DAY87.9 85.2 100.0 100.0 99.0 16.20 -1.00
4 STONE8W/
DAY14.5 13.2 5.0 5.0 12.4 -6.06 148.00
5
OTHERS
REVENUE
GOODS
LOADING
8W/
DAY13.1 12.9 27.9 25.6 12.8 -0.78 -50.00
NB,E/F/wagon,F
ERT,SUGAR,CEM
, COKE,
COAL,Y/PEAS
B
1 LOADING 8W 32040 23438 36500 27500 27211 16.10 -1.05
PERCENTAGE
FREIGHT PERFORMANCE :
COMMODITY-WISE GOODS LOADING :
CONTAINER PERFORMANCE :
OPERATING PERFORMANCE DURING 2014-15 ( UPTO DECEMBER)
SL.
NO.ITEM UNIT
2013-14 2014-15 IMPROVEMENT
PERFORMANC
ETARGET PERFOR
MANCE
(UPTO
DEC)
OPERATING
I) PRFORMANCE
Page no. 114
Remarks
FULL
YEAR
UPTO
DEC
FULL
YEAR
UPTO
DEC
w.r.t
LAST
YEAR
w.r.t
TARGET
C
1 WAGON
HOLDING
8W/
DAY1461 1480 1365 1365 1305 -11.82 -4.40
2JUMBO
HOLDING
RK/
DAY15.2 15.5 15.0 15.0 12.2 -21.29 -18.67
3BOXN
HOLDING
RK/
DAY3.8 3.8 4.0 4.0 3.2 -15.79 -20.00
4 WAGON
RELEASE
8W/
DAY532 520 575 575 515 -0.96 -10.43
Less no of
Inwards rakes
(average 5
nos/month)
arrived in this
division mainly
at CP,NACC,CSZ
*
5WAGON TURN
ROUNDDAY 1.50 1.58 1.32 -16.46
6ELEC LOCO
UTILISATION
KM/
DAY
/
ENG
422.5 421.8 250 250.00 410.6 -2.66 64.24
7
DSL LOCO
UTILISATION
(WDM CLASS)
KM/
DAY
/
ENG
426.7 427.4 430 430.00 422.2 -1.22 -1.81
6ELEC LOCO
HOLDING
No./
DAY12.0 11.9 13.0 13.00 11.0 -7.56 -15.38
7DSL LOCO
HOLDING
(WDM2)
No./
DAY4.4 4.4 3.0 3.0 4.4 0.00 46.67
8
RECEIVED8W/
DAY869 851 901 5.88
DESPATCH8W/
DAY868 850 903 6.24
TOTAL
WAGON
8W/
DAY1737 1701 1804 6.06
OTHER OPERATING INDICES :
WAGON INTERCHANGE
PERCENTAGE
OPERATING PERFORMANCE DURING 2014-15 ( UPTO DECEMBER)
SL.
NO.ITEM UNIT
2013-14 2014-15 IMPROVEMENT
PERFORMANC
ETARGET PERFOR
MANCE
(UPTO
DEC)
BEST EVER INDICES
(UPTO December)
• HIGHEST EVER CUMULATIVE LOADING OF 162.5 WAGONS PER
DAY RECORDED UP TO DEC'14.
Page no. 115
Remarks
FULL
YEAR
UPTO
DEC
FULL
YEAR
UPTO
DEC
w.r.t
LAST
YEAR
w.r.t
TARGET
D
1 MR % 99.0 99.1 100.0 100.0 98.8 -0.30 -1.20 Due to reshedule
2 M/EXP % 96.5 96.4 100.0 100.0 98.2 1.87 -1.80 Due to reshedule
3 PASS % 86.3 87.9 95.0 95.0 92.9 5.69 -2.21Due to doubling
work in LGL sec
4 EMU % 97.0 97.3 100.0 100.0 97.9 0.62 -2.10
PUNCTUALITY PERFORMANCE :
*Though less nos of inward rakes arrived in this division, average 16 nos / month of parcel Exp dealt in
this year at CP. The average nos of unloading of parcel van is 2 / day .
PERCENTAGE
OPERATING PERFORMANCE DURING 2014-15 ( UPTO DECEMBER)
SL.
NO.ITEM UNIT
2013-14 2014-15 IMPROVEMENT
PERFORMANC
ETARGET PERFOR
MANCE
(UPTO
DEC)
• LOWEST EVER AVERAGE DIVISIONAL WAGON BALANCE WAS 1305
8W PER DAY RECORDED UPTO December-14
NOTABLE ACHIEVEMENT
Revenue goods loading up toDec’14 was 162.5 wagons per day as against
158.5 wagons per day which has increase of 2.5% w.r.t last year . The best
ever loading surpassing the previous best of 158. 5 achieved in 2013-14( up
to Dec).
REVENUE GOODS LOADING(8W)
Cumulative average of Divisional Holding up to Dec’14 was 1305 wagon per
day as against 1480 wagon per day which has improved 11.8% over last year.
153.2 145.2
153.0 159.4 158.5 162.5
152.9 161
50
70
90
110
130
150
170
190
2010-112011-122012-132013-142013-14(UPTO DEC)
2014-15 PROP TARGET…
TARGET (14-15)
% VARIATION w.r.t LAST YEAR = 2.54 % VARIATION w.r.t
Page no. 116
10.3 10.4 11.2
12.0 11.9 11.0
13.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
2010-11 2011-12 2012-13 2013-14 2013-14(UPTODEC)
2014-15 TARGET
DIVISIONAL HOLDING
Average number of Electric loco holding up to Dec’14 was 11.0 as against 11.9
which has improved 7.6% w.r.t last year & 15.4% over target.
ELECTRIC LOCO HOLDING
1528
1363 1442 1461 1480
1305 1365.00
1000
1200
1400
1600
1800
2000
2010-11 2011-12 2012-13 2013-14 2013-14(UPTODEC)
2014-15 TARGET (14-15)
% VARIATION w.r.t LAST YEAR = -
% VARIATION w.r.t LAST YEAR =
-7.48
Page no. 117
EQUIPMENT FAILURE ( UPTO DECEMBER)
ITEMS ACHIEVEMENT IMPROVEMENT
( In % ) 2013-14 2014-15
E/LOCO FAILURE
12 5 58.33
D/LOCO FAILURE
6 4 33.33
WAGON FAILURE
0 0
RAIL FAILURE
23 13 43.48
OHE FAILURE
6 4 33.33
SIGNAL FAILURE
3295 3519 -6.80
12
6 6
23
5 4 4
13
0
5
10
15
20
25
E/LOCO FAILURED/LOCO FAILUREOHE FAILURERAIL FAILURE
EQUIPMENT FAILURES (UPTO DEC)
2013-14
2014-15
Page no. 118
IMPROVEMENT OF M/ EXP & PASSENGER SERVICES IN SEALDAH
DIVISION
TRAIN NO./
TRAIN NAMEFROM TO
TRAIN NO./
TRAIN NAMEFROM TO
KOAA-22:45
(SAT)
SMI-13:30
(SUN)
SMI-21:40
(SUN)
KOAA-12:25
(MON)
KOAA-12:20
(THU)
AGC-16:50
(FRI)
AGC-04:40
(SAT)
KOAA-08:45
(SUN)
63105/63106
SDAH-BPC
MEMU PASS
w.e.f.UP-05.12.13
DN-06.12.13
SDAH
D-20:20
A-12:45
BPC
A-00:25
D-08:20
inagurated at BPC
on 04.12.13
SDAH DEP-15:20
SDAH ARR-14:55
SDAH DEP-
18:30(TUE,FRI)
SDAH ARR-
21:05(FRI,MON)
New Service M/Exp-04 MEMU-2 New Service PREMIUM-4
22315/22316
SDAH-JU-SDAH
PREMIUM EXP
NEW M/EXP. SERVICES INTRODUCED- Nil
NEW PASS. SERVICES(MEMU) INTRODUCED- Nil
Budget announced train yet to be introduced
PREMIUM=4
2014-15
22313/22314
SDAH-KATRA-SDAH
PREMIUM EXP.
MAIL/EXP =Nil
2013-14
NEW M/EXP. SERVICES INTRODUCED- 04
NEW PASS. SERVICES(MEMU) INTRODUCED- 02
2014-15
MAIL/EXP =Nil MAIL/EXP =04+PASS=02
13117/13118 KOAA- BPC Dhandhanney Express has
been extended from BPC to LGL w.e.f.-04.07.2013.
63131/63132 KNJ-BPC MEMU Passenger has been
extended one side from RHA instead of KNJ and
another side to CSZ instead of BPC w.e.f.-31.07.2013
13165/13166
KOAA-SMI
Weekly Exp
Introduced Ex KOAA-
07.12.2013
Ex SMI-08.12.2013
13167/13168
KOAA-AGC
Weekly Exp
Introduced Ex KOAA-
13.02.2014
Ex AGC-15.02.2014
Budget announced train yet to be introduced
2013-14
Page no. 119
ADDITIONAL SUBURBAN (EMU) SERVICES IN VERIOUS OCCASSIONS.
(From April – 2014 to Jan – 2015)
Occasion Date Station Nos. Of EMU
services/day (Pair)
No. of days
Tot. services
From To From To
Sandal
Mela
03.08.2014 SDAH GOF 2 1 2
Lokenath
birth
15.08.14 17.08.14 BT HNB 3 1 3
Durga
puja
30/01.10
.14
03/04.10
.14
SDAH RHA 1
4 80
SDAH BNJ 1
SDAH DKAE 1
SDAH NH 2
RHA BNJ 1
BRP SDAH 3
BGB SDAH 1
Kali Puja
23/24.10
.14
24/25.10
.14
SDAH DKAE 1
2 16 SDAH BT 1
SDAH RHA 1
BRP SDAH 1
Jagadhat
ri Puja
31/01.10
.14
01/02.1
1.14 RHA KNJ 1 2 04
Rash
Yatra
7/8.11.1
4
8/9.11.1
4 SDAH STB 1 2 04
RRC
Exam.
GP-Rs
1800
30.11.2014 All SUE(103)services of
Sealdah Division have been
planned to run up to 16 hrs 1 103
Mass
Raly
(CPI-M)
16.12.2014 RHA
BT
PPGT
SDAH
1
1 1 4
Kalpatar
u Utsab
01.01.2015 SDAH DKAE 2 1 4
Gangasa
gar Mela
12.01.1
5
16.01.15 SDAH LKPR-
NAM
5 43
Total services 263
Page no. 120
MAIL / EXPRESS SPECIALS DURING APRIL-2014 TO TILL DATE. Comparison of April – December (2013 & 2014)
Sl.
No. Route
No. of
trips-
2014
No. of
trips
2013
Improvement
Summer Spl.
1 Indore - Sealdah 26 00
2 KOAA - HW 14 22
3 SDAH - Puri 06 12
4 JP - KOAA 10 00
5 ANVT – KOAA 08 32
6 SDAH - NDLS 14 01
7 SDAH- NJP 00 08
8 KOAA –PNBE 00 01
TOTAL 78 76 +2.6%
Durga Puja, Diwali & Chhat Puja Spl.
1 SDAH/KOAA –
NDLS 12 18
2 KOAA- ANVT 00 18
3 SDAH-GHY 06 00
4 DBRG – KOAA 16 00
5 SDAH -AII 10 00
6 SDAH - PURI 12 00
7 JP-SDAH 12 00
8 SDAH – DLI 20 00
9 KOAA – JYG 01 00
10 SDAH - BARHNI 01 00
11 KOAA- NJP 00 08
12 MFP-KOAA 00 17
13 KOAA-GKP 00 06
Page no. 121
Sl.
No. Route
No. of
trips-
2014
No. of
trips
2013
Improvement
14 JU-KOAA 00 02
15 RXL-KOAA 00 02
TOTAL 90 71 +26.8%
Winter Spl.
1 KOAA – PURI 04 04
2 SDAH – KYQ 04 00
TOTAL 08 04 +100%
Election Spls & others
1 KOLKATA -
PNBE 02 00
2 KOAA – NJP 04 00
3 KOAA – AJMER 02 00
4 NKJ – BHUJ 01 00
5 KOAA – DMV 01 00
6 KOAA – GAYA 01 00
7 KYI- New GHY 01 00
8 BNC – SDAH 01 00
9 KOAA-RXL 02 00
10 New Alipur
Dwar - KOAA 02 00
11 KOAA-
Daltanganj 01 00
12 KNJ-SAMBA 00 02
13 JU-SDAH 00 02
14 KOAA-GAYA 00 01
TOTAL 18 05 +260%
Page no. 122
Sl.
No. Route
No. of
trips-
2014
No. of
trips
2013
Improvement
Total 194 156 +24.4%
AUGMENTATION
TYPE
2013 - 2014
2014 - 2015
IMPROVEMENT %
TOTAL 2013-14
UPTO DEC
TOTAL 2014-
15 UPTO DEC
FAC 6 5 -16.7
FACCW 6 1 -83.3
ACCW 75 0 -100.0
CWNAC 47 34 -27.7
ACCN 44 180 309.1
GSCZAC 86 227 164.0
GSCN 128 413 222.7
GS 12 0 -100.0
GS-CZ 170 126 -25.9
SLR 9 11 22.2
FC 0 0 0.0
ACCND 0 0 0.0
WCB 2 1 -50.0
VP 62 273 340.3
LFAC/R 16 22 37.5
LWACCW/R 65 57 -12.3
LWACCN/R 113 28 -75.2
LCBAC/R 0 0 0.0
LWLRRM/R 0 0 0.0
LFAC/D 2 0 -100.0
LWACCW/D 1 0 -100.0
LWACCN/D 32 7 -78.1
LCBAC/D 0 0 0.0
LWLRRM/D 0 0 0.0
ACCNH 2 11 450.0
SCZACH 0 0 0.0
FAC-PU 1 0 -100.0
ACCN-PU 2 0 -100.0
Page no. 123
GSCN-PU 0 0 0.0
WRRMDAC 0 0 0.0
TOTAL 881 1396 58.5
NO. OF TRAINS AFFECTED ( MAIL EXPRES)
DEPTT
2013 - 14
2014 - 15
% INCREASE / DECREASE
TOTAL
UPTO DEC
TOTAL
UPTO DEC
ENGG 6 1 -83.3
ENGG CON 1 0 -100.0
S&T 18 18 0.0
S&T 0 0 0.0
S&T CON
1 1 0.0
Elec /G 5 4 -20.0
TRD CON
1 1 0.0
TRD 8 3 -62.5
C&W 3 6 100.0
TRS 12 4 -66.7
D&P 7 6 -14.3
TFC 27 3 -88.9
PBOL PBS
9 4 -55.6
COML 5 1 -80.0
L&O ACP MA
6 7 0.0
SECURITY 0 0 0.0
AGT 5 5 0.0
RE-SCH 281 179 -36.3
ACDT RLY.. 9 3 -66.7
L/C GATE V/D
1 0 -100.0
L/C GATE V/ DASH
6 2 -66.7
L/C GATE RD 0 1 0.0
ODV / ORL 9 4 -55.6
PATH 19 1 -94.7
Page no. 124
HRO / CRO 4 1 -75.0
Bad Wthr 41 13 -68.3
INCIDENT& OTHERS
58 17 -70.7
TOTAL 542 285 -47
NO. OF TRAINS AFFECTED ( EMU)
DEPTT
TOTAL 13 - 14 UPTO DEC
TOTAL 14 - 15 UPTO DEC
% INCREASE
/ DECREASE
ENGG 713 476 -33.2
ENGG CON 320 8 -97.5
ENGG WEA 0 0 0.0
PBEC 8 0 -100.0
PBOL 34 85 150.0
PRONI 5 11 120.0
CONNI 17 60 252.9
S&T 1426 1056 -25.9
S&T ET
1 2 100.0
S&T (PROJ/ WTHR)
8 0 -100.0
S&TCON 119 57 -52.1
Elec /G
4 13 225.0
Elec/G /Con
0 0 0.0
OHE 240 49 -79.6
OHE WEA
0 0 0.0
OHE / OTH 0 0 0.0
OHE CON
21 6 -71.4
Page no. 125
NO. OF TRAINS AFFECTED ( EMU)
DEPTT
TOTAL 13 - 14 UPTO DEC
TOTAL 14 - 15 UPTO DEC
% INCREASE
/ DECREASE
C&W 6 2 -66.7
TRS 208 98 -52.9
D&P 14 38 171.4
TFC 242 149 -38.4
COM 1 5 400.0
OTH 43 657 1427.9
L&O 65 50 -23.1
ACP 35 18 -48.6
CRO 22 15 -31.8
AGT 158 275 74.1
ACC RLY 169 42 -75.1
L/C GATE V/DASH
302 137 -54.6
L/C GATE VD
61 70 14.8
L/C GATE RD
323 380 17.6
INT. DIV ORL
30 21 -30.0
Bad Weather
969 562 -42.0
PASS RUSH 0 0 0.0
OUT OF PATH
577 122 -78.9
INCIDENT 451 300 -33.5
MA 39 19 -51.3
HRO 41 47 14.6
RE-SCH 0 0 0.0
TOTAL 6672 4830 -27.6
Page no. 126
IMPROVEMENT OF 12-CAR SERVICES IN SEALDAH DIVISION AS ON 15.01.2015:
TOTAL RAKES
M &
N
Secti
on
South Sec. Total
Services As On Date
01(M/L)+09(South)=
10
07
nos. 109 nos.
116
nos.
From
12.10.2010
01(M/L)+12(South)=
13
07
nos. 143 nos.
150
nos.
From
19.02.2011
01(M/L)+13(South)=
14
07
nos. 155 nos.
162
nos.
From
14.11.2011
01(M/L)+14(South)=
15
07
nos. 167 nos.
174
nos.
From
28.11.2011
02(M/N)+14(South)=
16
16
nos. 167 nos.
183
nos.
From
20.02.2012
02(M/N)+17(South)=
19
16
nos. 204 nos.
220
nos.
From
01.06.2012
04(M/N)+17(South)=
19
29
nos. 204 nos.
233
nos.
From
15.08.2012
07(M/N)+17(South)=
24
58
nos. 204 nos.
262
nos.
From
15.11.2012
08(M/N)+17(South)=
25
70
nos. 204 nos.
274
nos.
From
26.12.2012
08(M/N)+20(South)=
28
70
nos. 236 nos.
306
nos.
w.e.f.
08.07.2013
08(M/N)+21(South)+1
(HWH)=30
70+0
6(by
HWH
rake)
251 nos. 327
nos.
w.e.f.
01.11.2013
08(M/N)+22(South)+1
(HWH)=31
70+0
6(by
HWH
rake)
263 nos. 339
nos.
w.e.f.
06.03.2014
08(M/N)+24(South)+1
(HWH)=33
70+0
6(by
HWH
rake)
285 nos. 361
nos.
w.e.f.
23.06.2014
13(M/N)+24(South)+1
(HWH)=38
124+06
(by
HWH
rake)
285 nos. 451
nos
To be
completed
within15.01.15
Page no. 127
WORKS COMPLETED DURING APRIL TO DECEMBER 2014
DOUBLING
SECTION KM DATE OF COMMISSION
Krishnanagar City Jn- Bethuadahari
27.92 21.9.14
Bhagwangola-Jiaganj 11.52 30.11.14 SPEED RAISING
Ghutiari Sharrif- Canning 14.05 03.12.14 Chandpara- Bangaon 9.77 14.11.14 Barasat- Sandalia 12.12 31.11.14 Phulia- Santipur 7.19 07.11.14
TRAFFIC FACILITY WORKS
Renovation of Wharf at Cassipore line no. 7&12
- 08.4.14
Extension of 02 stabling lines at Naihati for stabling of 12 Car EMU
- 10.4.14
Automatic signaling system between Birati - Madhymgram
4.31 13.4.14
Renovation of Wharf at Cassipore line no. 14&17
- 30.4.14
Kolkata Terminal- Second ladder to pit line, fit coach line , sick coach line and engine escape line (Ph-V work)
25.4.14
Extension of PF for running of 12 coach EMU at Kalyani
- 07.6.14
Electrification of Goods line no.1 at Naihati
- 19.9.14
Automatic signaling system between Madhymgram- Barasat
4.53 23.11.14
II) ASSISTANCE REQUIRED
� After completion of double line work between KLNP-STB section, the
necessity of early repair / construction of old bridge No. 2A at KLNP
should be considered urgently.
� The proposal for opening of Naihati Goods shed as a ‘Dump Station’
may be considered.
� Early completion on NH-BDC by pass line.
Page no. 128
� Early completion of Up loop cum Dn despatch line at New Garia
Terminal.
� Early completion of 3 stabling lines at SDAH/S for running of 12 Car
EMU trains(SIP not yet received from HQ).
� Inclusion of estimate of R/Rooms in new proposed RRI building at
DDJ where CMS is also to be housed.
� The competent Authority has decided to create 80 post of ASM against
the proposal for 95 post for which fresh money value is to be
surrendered. Now division is able to surrender post to create only 40
post of ASM in this financial year in phase-I and matching money
value for creation of remaining 40 post to be surrendered in the next
financial year when vacant post will be available.
II) ISSUES RAISED BY PASSENGER ASSOCIATION:
COMPLIANCE IN CONNECTION WITH DEMANDS PLACED BY MP, MLA &
PASSENGER ASSOCIATIONS OF KYI-RHA-GEDE SECTION
Sl.
No. Demands Item wise remarks
Payradanga Passengers(Rly) Association
1
Additional stoppages of
trains at PDX:
Up-31617SDAH-RHA(11:19)
31711(NH-RHA(13:01)
31831(SDAH-
KNJ)(19:08)
53181(SDAH-
LGL)(00:58)
Dn-31618 RHA-
SDAH(07:36)
31712RHA-NH(11:46)
31624RHA-SDAH(15:36)
53176LGL-SDAH(10:59)
Payradanga(PDX) station is situated
in NH-RHA section with total 143
(UP-72&DN-71)EMU services
having only eight(UP-04&DN-04)
trains including two LGL Passenger
as non stopping(galloping) due to
most of them are galloping services.
Timings at PDX with next stopping
trains are indicated below:
Non-stop 31617 11:19 31618 07:36
Stopping
train
31915 11:32 31616 07:26
Non-stop 31711 13:01 31712 11:46
Stopping
train
31521 13:13 31524 12:03
Non-stop 31831 19:08 31624 15:36
Stopping
train
31531 19:18 31922 15:10
UP T
RA
INS
DO
WN
TR
AIN
S
As there is regative growth in no. of
Page no. 129
passengers to the tune of 7.67%
and provision of stopping trains at
Payradanga station exist within
next 10 to 15 mts. additional
stoppage of trains at PDX for train
no.31617/18, 31711/31712, 31831
& 31624 at PDX is not justified at
present.
Confederation of Sealdah Division Passenger’s Association
1
Arrival of 30142Dn GEDE-
MJT local at MJT has been
changed from 09:11 to
09:21 in the Time Table-
Sept/2014 which was
created to the commuters
of the train and requested
to reinstate it.
Timings & nomenclature of
31391SDAH-KYI local has been
changed to 31633up SDAH-RHA
local by early departure from SDAH
at 08:08hrs to provide one new
down EMU services departed from
RHA at 10:12hrs to facilitate the
Teachers & students of RHA-KYI
section as there is a gap of
40minutes (from 09:44 to 10:24hrs)
in down direction in the section.
Consequently 30145Up BBDB-KNJ
local has also been proposed to pre-
pone its departure from BBDB at
08:38 instead of 08:53hrs with all
stoppage so that it will follow the
path & stoppages of 31391SDAH-
KYI local from DDJ station. With
the above changes crossing
arrangement between 30142Dn &
30145Up is being shifted from
BBDB to BBR in Circular Railway
single line section with minor
(10minutes later) change in arrival
time at MJT.
Passengers of 31626Dn RHA-SDAH local
1
Stoppage of 31626Dn
RHA-SDAH local at
Khardaha station
31626Dn RHA-SDAH local is
running without having stoppages
at JGDL, TGH & KDH station to
minimize its running time in NH to
SDAH section from Monday to
Saturday and arrived at SDAH at
19:10hrs. On Sunday it is running
having all stoppages with arrival at
SDAH at 19:15hrs due to 32244Dn
Page no. 130
(SUE)DKAE-SDAH local(schedule
arrival at SDAH is 19:15) is not
available on Sunday. Hence
additional stoppages of this train
will not operationally feasible
considering the passage of
32244Dn (SUE) DKAE-SDAH local
between DDJ-SDAH section.
Soumen Sarker, Passenger of 53151Up RHA-LGL Pass.
1
Departure time of
53151Up RHA-LGL Pass
not to be changed to
06:55hrs instead of
07:38hrs
Five pair new services have been introduced in KNJ-LGL single line section of length-127.67kms which led to loss in pass punctuality in the year 2013-14(86.4%) in respect with 2012-13 (93.8%), mainly 13113Up Hazarduari Exp suffered maximum delay on this account.
After thorough examination it was revealed that introduction of new trains mainly in morning peak period was the root cause for the loss in punctuality where trains were suffering major loss for crossing arrangement between Dhubulia to Beldanga station and late running of down trains of the section also led to path congestion in KNJ-SDAH section. Hence departure of 53151Up RHA-LGL has been proposed to pre-pone at 06:55hrs for smooth running all passenger services including of 13113Up Hazarduari Exp in the section.
Passengers of SDAH-KYI section:
1
Require new train services in between 08:45 to 09:20hrs in SDAH-KYI section
31391SDAH-KYI local was running
departed from SDAH at 08:55hrs.
In the present time table it has
been proposed to run as 31633up
SDAH-RHA local departed from
SDAH at 08:08hrs to provide one
new EMU services in down
direction departed from RHA at
Page no. 131
10:12hrs to facilitate the Teachers
& students of RHA-KYI section as
there is a gap of 40minutes(from
09:44 to 10:24hrs) in down
direction in the section.
Consequently 30145Up BBDB-KNJ
local has also been proposed to pre-
pone its departure from BBDB at
08:38 instead of 08:53hrs with all
stoppage so that it will follow the
path & stoppages of 31391SDAH-
KYI local from DDJ station.
Sri Amal Krishna Paul, Passenger, SDAH-KNJ section
1
Following demands have placed are
indicated below:
i) New down train from KNJ which to be arrived SDAH at 05:40hrs
ii) Departure time of 30145 Up BBDB-KNJ local to be pre-poned at 08:30 instead of 08:53hrs
iii) New up train for KNJ departs from SDAH at 14:45hrs.
iv) New up train for BP departs from SDAH at 20:00hrs as SUE services.
v) New up train for KNJ departs from SDAH at 22:00hrs.
vi) 31818Dn KNJ-SDAH local to be operated by 12-Car rake instead 9-Car rake.
vii) All MEMU local should run having all stoppages between RHA-KNJ.
viii) Train services to be planned at 30minutes gap.
ix) Old Kalinarayan bridge over Churni river to replace with new one for smooth running of train.
x) Due to parking problem at DDJ/SDAH Link trains are required with NH/KYI/ RHA.
xi) More BBDB-KNJ local
Demand of a large
number of additional
EMU services in the
section will not be
feasible for path
constraints in SDAH-
KGK-DDJ section as line
capacity utilisation of the
section in SDAH-KGK
is103.9% & in KGK-DDJ
is 107.8%. Only one Up
SDAH-KNJ EMU local
departed from SDAH at
around 22:20hrs and one
Dn KNJ-SDAH EMU local
departed from KNJ at
around 03:30hrs may be
planned by shifting one
night stabled EMU rake
from SDAH to KNJ.
Page no. 132
MISSION AREA 2014 – 15
���� To make an effort to bring down to zero the yard derailment (SDAH –
KOAA) on account of traffic department.
13 – 14 (upto December) 14 – 15 (upto December)
Total No. Of
Yard
Derailment
Traffic
Account
Total No. Of
Yard
Derailment
Traffic
Account
0 0 0 0
���� To increase the percentage of 12 coach running of EMU rakes in the
division.
13 – 14 14 – 15 Improvement
37.92 % 46.42 % 8.5 %
To increase the percentage of 12 coach running of EMU rakes following
infrastructural development to be done :
� Facility of accommodation of 12 coach EMU rake at PF No. 2,3,4 &
4A of SDAH station.
� PF No. 1 of TGH to be extended.
� Platforms of Circular Railway of Gurudas Banerjee Halt, PQS &Tala
to MJT have no facility to accommodate 12 coach EMU rakes.
���� Filling of vacancy in safety category
� To fill up the vacancy in the Guard category the LDCE and PRQ
selection is under process.
� Pre promotional Coaching for LDCE in ASM Category is going on.
� The competent Authority has decided to create 80 post of ASM
against the proposal for 95 post for which fresh money value to be
surrendered. Now division is able to surrender post of same money
value to create only 40 post of ASM in this financial year and
matching money value for creation of remaining 40 post to be
surrendered in the next financial year.
Page no. 133
71 post of Gateman against the proposal for 109 posts have been
sanctioned.
���� To increase the percentage of premium examination upto (90%) at
Chitpur and Naihati.
Stn. / Yd 13 – 14 14 – 15 Improvement
CP 41 % 85 % 44 %
NH 48 % 92.5 % 44.5 %
���� Doubling between Bhagwangola to Jiaganj was completed on 01.12.14
and Krishnanagar to Bethuadahari on 22.09.14 to improve the
passenger punctuality as well as goods train running.
Doubling work between Kalinarayanpur – Fulia was completed on
05.01.15
���� Divisional Loading
Loading of this Division is slightly better (2.5%) than the previous year
though:
COMMODITY SHORTFALL REASONS
FCI NIL
In the current financial year FCI is
bringing inward rakes instead of
outward loading
DOC NIL
After acceptance of BCN wagon directly
by Bangladesh Rly. this division has
lost the loading of DOC which is now
going to HWH. This division made a
proposal for Naihati as dump loading
point but the decision is yet to be
finalised division
JUTE Dropped by
45.9 % Less demand in market
STONE Dropped by intervention of HQ is required.
Page no. 134
10.8 %
INWARD RAKES RECEIVED AT TERMINALS OF SEALDAH DIVISION
Term
inal
Commodity Year TOT. UPTO DEC
AVG / MONTH UPTO DEC
CP
Sugar 2013-14 54 6.0
2014-15 2 0.2
Salt 2013-14 80 8.9
2014-15 97 10.8
Onion 2013-14 23 2.6
2014-15 29 3.2
Dump 2013-14 5 0.6
2014-15 0 0.0
Cont 2013-14 35 3.9
2014-15 23 2.6
Others 2013-14 5 0.6
2014-15 12 1.3
TOTAL 2013-14 202 22.4
2014-15 163 18.1
CE
D
F/grain 2013-14 26 2.9
2014-15 4 0.4
Cement 2013-14 395 43.9
2014-15 415 46.1
CESC Coal
2013-14 31 3.4
2014-15 19 2.1
Dump 2013-14 1 0.1
2014-15 0 0.0
Cont 2013-14 106 11.8
2014-15 131 14.6
Others 2013-14 1 0.1
Page no. 135
2014-15 0 0.0
TOTAL 2013-14 560 62.2
2014-15 569 63.2
T
erm
inal
Commodity Year TOT. UPTO DEC
AVG / MONTH UPTO DEC
NA
CC
Cement 2013-14 212 23.6
2014-15 187 20.8
Others (F/Grain
etc.)
2013-14 0 0.0
2014-15 0 0.0
TOTAL 2013-14 212 23.6
2014-15 187 20.8
BLN
S/Chips 2013-14 54 6.0
2014-15 31 3.4
TOTAL 2013-14 54 6.0
2014-15 31 3.4
BG
B
F/grain 2013-14 81 9.0
2014-15 81 9.0
POL (HSD, LDO)
2013-14 131 14.6
2014-15 109 12.1
CESC Coal
2013-14 748 83.1
2014-15 763 84.8
Others (PBC, GG)
2013-14 1 0.1
2014-15 17 1.9
TOTAL 2013-14 961 106.8
2014-15 970 107.8
SE
P
L/Stone 2013-14 5 0.6
2014-15 4 0.4
Silica Sand 2013-14 15 1.7
2014-15 6 0.7
I/Ore 2013-14 74 8.2
2014-15 107 11.9
Others 2013-14 0 0.0
2014-15 0 0.0
TOTAL 2013-14 94 10.4
Page no. 136
2014-15 117 13.0
Term
inal
Commodity Year TOT. UPTO DEC
AVG / MONTH UPTO DEC
TG
H
CESC Coal
2013-14 240 26.7
2014-15 253 28.1
Others 2013-14 1 0.1
2014-15 0 0.0
TOTAL 2013-14 241 26.8
2014-15 253 28.1
KY
I
F/Grain 2013-14 74 8.2
2014-15 68 7.6
Others 2013-14 0 0.0
2014-15 0 0.0
TOTAL 2013-14 74 8.2
2014-15 68 7.6
KN
J
F/grain 2013-14 36 4.0
2014-15 45 5.0
Cement 2013-14 83 9.2
2014-15 86 9.6
Fert 2013-14 44 4.9
2014-15 42 4.7
Others 2013-14 0 0.0
2014-15 3 0.3
TOTAL 2013-14 163 18.1
2014-15 176 19.6
Page no. 137
Term
inal
Commodity Year TOT. UPTO DEC
AVG / MONTH UPTO DEC
CSZ
Salt 2013-14 6 0.7
2014-15 4 0.4
Cement 2013-14 118 13.1
2014-15 96 10.7
Fert 2013-14 69 7.7
2014-15 67 7.4
Others ( Sugar etc.)
2013-14 2 0.2
2014-15 5 0.6
TOTAL 2013-14 195 21.7
2014-15 172 19.1
BPC
F/grain 2013-14 50 5.6
2014-15 57 6.3
Cement 2013-14 14 1.6
2014-15 11 1.2
Fert 2013-14 4 0.4
2014-15 5 0.6
TOTAL 2013-14 68 7.6
2014-15 73 8.1
BT
F/Grain 2013-14 35 3.9
2014-15 49 5.4
Others (Fert,Maize,Doc etc.)
2013-14 33 3.7
2014-15 30 3.3
TOTAL 2013-14 68 7.6
2014-15 79 8.8
BN
J
Sugar 2013-14 0 0.0
2014-15 0 0.0
Others(FG, paper,Cotn, Doc,Cont,
Iron, Onion,
PSBL etc.)
2013-14 18 2.0
2014-15 9 1.1
TOTAL 2013-14 18 2.0
2014-15 9 1.0
Grand 2013-14 2910 323.3
Page no. 138
Total 2014-15 2867 318.6
SECTIONAL PERFORMANCE
SECTIONAL DESCRIPTION.
A. Section- Sealdah to Ranaghat
Updated on 02.01.15
Ruling Gradient – 1:300 (SDAH -NH) &1:520(NH-RHA)
Track - SDAH-KNR= Quadruple, NH-KNR=Triple (1Up,1 Dn. & 1Common Line) ,
NH-RHA= Double
Signaling system – MACL (SDAH- SEP- Automatic & SEP-RHA Absolute)
Maximum cum Booked Speed – SDAH-RHA– 95 Kmph .
No. of Block stations -19; No. of Block cabin-01; No. of Flag stations -05
KM from SDAH
Station s Class of Interloc
king
System of Working
Line System
Remarks
0 Sealdah RRI Spl. Quadruple Terminal station 2.08 Kankurg
achhi RRI Automatic Quadruple Block cabin
3.60 Bidhannagar
Flag - Quadruple
6.86 DumDum Junction
RRI Automatic with BLH, BARN, & DDC and Absolute with KOAA
Quadruple with BLH and Double with DDC & BARN and Single with Circular Rly System
11.31
Belgharia PI-Std-.III
Automatic Quadruple Siding feeding station – Texmaco ( done by Block back with SEP on Dn Main line)
13.66
Agarpara Flag - Quadruple
15.68
Sodepur PI-Std-III
Automatic with BLH & Absolute with KDH
Quadruple Siding feeding station – Texmaco,& ECL
18.43
Khardaha
PI-Std-.III
Absolute Quadruple
Page no. 139
20.28
Titagarh Std -III-end PI cabins
Absolute Quadruple Goods dealing station & Feeds sidings CESC, TWL
KM from SDAH
Station s Class of Interlocki
ng
System of Working
Line System
Remarks
22.39 Barrackpore PI-Std-.III Absolute Quadruple Military siding station
24.99 Palta Flag - Quadruple 26.91 Ichhhapur PI-Std-.III Absolute Quadruple 30.11 Shyamnaga
r PI-Std-.III Absolute Quadruple
33.21 Jagaddal Flag - Quadruple 35.02 Kankinara PI-Std-.III Absolute Triple 37.64 Naihati Jn. RRI Absolute Double Goods dealing
station and having goods Yard also.
41.83 Halisahar PI-Std-.III Absolute Double 45.01 Kanchrapar
a PI-Std-.III Absolute Double
48.01 Kalyani PI-Std-.III Absolute and one train system on KYI-KLYM section
Double FCI feeding station
52.87 Madanpur PI Std- III Absolute. Double 57.05 Simurali PI Std- III Absolute Double 59.37 Palpara Flag - 61.78 Chakdaha PI-Std-.III Absolute Double 67.51 Payradanga PI Std-III Absolute Double 73.18 Ranaghat .
Jn. RRI Absolute Double&
single line MAJ sections
Page no. 140
B. SECTION – RANAGHAT JN TO GEDE (up dated-02.01.15)
Ruling Gradient – 1:400 ,Track – Double ,Signaling system – MACL
Maximum cum Booked Speed – 90 KMPH
No of Block stations -5
No. of Flag stations -Nil No. of Halt stations –8
KM from SDAH
Station Class of
Interlocking
System of
Working
Line System
Remarks
77.64 Bankimnagar Halt
Halt - Double
079.05
Panchhberia Halt
Halt Double
81.88 Aranghata PI Std- III
Absolute. Double
86.30 Bahirgachhi Halt
Halt Double
88.15 Shantinagar Halt Double 90.30 Bhayna Halt Halt Double 92.94 Bagula PI Std-
III Absolute. Double
96.40 Mayurhat Halt
Halt Double
98.90 Tarak Nagar Halt
Halt Double
104.86
Majhdia PI Std- III
Absolute. Double
110.82
Banpur PI Std- III
Absolute. Double
113.70
Harishnagar Halt
Halt Double
116.45
Gede PI Std- III
Absolute. Double Interchanging point for Indo – Bangladesh Traffic. The Station is provided with three H.L Platform of 304 m .
Page no. 141
Brief Description of Gede section
The Ranghat –Gede section was initially part of Eastern Bengal Guaranteed
Railway Company. Later on this section became part of Eastern Bengal Railway
System after being acquired by state. The section was opened in four phases viz.
Ranaghat-Aranghata (opened on 07.8.1897) : Aranghata-Bagula (opened on
17.9.1897) ; Bagula- Majdia (opened on 17.11.1898) and Majdia- Darshana
(opened on 17.9.1899).
The station Darshana is now under Bangladesh and Gede is the terminal border
station of Indian Railways. This is the international interchange point for Indo-
Bangladesh Goods traffic on Sealdah Division. The 43.27 Km long electrified
double lined Ranaghat –Gede section has 5 Block Stations and 8 Halts Stations.
All the five Block stations of the section are B –class STD-III Panel interlocked
stations. Gede is a terminating station of the RHA-GEDE section at distance of
116.45 Km from Sealdah. The Station is provided with 4 Lines having receiving
and dispatch facilities ( Common), passenger trains can be handled on Line No.
1,3&4 having H.L Platform of 304 m long each . GEDE is the interchange point
between India and Bangladesh (DARSANA). Darsana is situated at a distance of
3.6 Km from Gede and the Indo- Bangladesh traffic was started in the year 1972.
Page no. 142
SALIENT FEATURES OF NH-RHA-GEDE SECTION
UP DN TOTAL
5 5 10
9 9 18
58 57 115
72 71 143
UP DN TOTAL
2 2 4
18 18 36
20 20 40
SL. NH-KYI KYI-RHA RHA-GEDE TOTAL
1 10.37 25.17 43.27 78.81
2 4 6 14 24
2 5 5 12
1 0 1 2
0 0 0 0
0 1 0 1
1 0 8 93
0 0 0 0
0 0 0 0
2 5 5 12
1 0 1 2
4 Absolute Absolute Absolute
5
6 NH-HLR CDH-PDX BGL-MIJ
7
UP&DN-
95KMPH
UP&DN-
95KMPH
UP&DN-
90KMPH
75KMPH 75KMPH 75KMPH
8
80kmph
75kmph
9
TRAFFIC: 4 9 9 22
ENGG.: 1 5 7 13
TRAFFIC: 0 0 0 0
ENGG.: 0 0 2 2
TRAFFIC: 0 0 0 0
ENGG.: 0 0 0 0
5 14 18 37
10 50.8 kmph 60.1 kmph 61.4 kmph
11 16.36mints 20.28mints 75.79mints
12 12.24mints 25.13mints 42.26mints
13
SECTION/LOCATION KM SPEED in KMPH
1 NH-RHA Nil Nil
2 RHA-GEDE Nil 15
3 KYI station limit 48/28-24 50
LOADED
L/C GATES:
INTERLOCKED
NONINTERLOCKED
UN MANNED
75kmph
MAXIMUM PERMISSIBLE SPEED:
FOR PASSENGER TRAINS
FOR GOODS TRAINS
MINIMUM RUNNING TIME FOR THROUGH GOODS (in minutes):
EMPTY 80kmph
SECTION
LENGTH OF SECTION (in kms):
NO. OF STATION:
BLOCK STATION
KALYANI-RANAGHATJN(25.17kms):-
TRAIN SERVICE
MAIL/EXPRESS
NON SUBURBAN
SUBURBAN EMU SERVICES
TOTAL TRAIN SERVICES
RANAGHATJN-GEDE(43.23Kms):-
TRAIN SERVICE
TRAIN SERVICES IN NH-RHA & RHA-GEDE SECTION
RRI CABIN
NH-RHA:1/520 RHA-GEDE:1/400
CRITICAL BLOCK SECTION:
BLOCK CABIN
FLAG STATION
HALT STATION(D)
STANDARD OF INTERLOCKING:STD-I
STD-II
STD-III
RRI
SIGNALLING:
RULLING GRADIENT:
TOTAL L C GATES
Points & crossings on transition of 1.20 curve.
Nil
while entiring EMU train at dead end platform
CAUSE
AVERAGE SPEED:
AVG. GAP BETN. TWO TRAINS:
AVG. RUNNING TIME:
PERMANENT CAUTION:
MAIL/EXPRESS
SUBURBAN EMU SERVICES
TOTAL TRAIN SERVICES
Page no. 143
STATION UP SECTIONS SERVICES DN SECTIONS SERVICES TOTAL
SDAH-NH - 21 NH-SDAH - 20
MJT-NH - 2 NH-MJT - 3
NH-KLYM- 1 KLYM- NH - 1
BGB - NH - 2 NH - BGB - 2
NH-RHA - 2 RHA - NH 2
NH-BDC - 19 BDC - NH 19
SDAH - KYI - 1 KYI - SDAH - 1
SDAH-KLYM 15 KLYM - SDAH - 13
BGB-KLYM- 0 KLYM - BGB - 1
MJT-KLYM 0 KLYM - MJT - 1
NH-KLYM- 1 KLYM - NH - 1
SDAH - RHA 12 RHA - SDAH 13
LADIES SPL 1 LADIES SPL 1
NH-RHA 2 RHA - NH 2
RHA -BNJ 14 BNJ -RHA 14
RHA - GEDE 8 GEDE - RHA 8
RHA-STB- 2 STB-RHA- 3
RHA-KNJ
via STB1 KNJ-RHA
via STB0
RHA - KNJ 3 KNJ - RHA 3
MJT -RHA 1 MJT -RHA 0
SDAH -GEDE
-10 GEDE -SDAH - 9
RHA -GEDE - 8 GEDE -RHA - 8
MJT-GEDE- 0 GEDE -MJT - 1
36
KYI/
KLYM17 17 34
NH
44
47
GEDE 18 18
47
RHA
94
44 88
COMPARATIVE FIGURE OF RAKE DETENTION AT KALYANI
Stage-wise Detention
Cumulative average 13 - 14
(Upto DEC)
Cumulative average 14 - 15
(Upto DEC)
% INCREASE
/ DECREASE
No. Of Rakes 74 68 -8.1
Arr. To Pld 3:51 3:01 -21.6
Pld To Reld 30:11 14:31 -51.9
Reld To Desp 11:38 10:05 -13.3
Dtn. 45:42 27:38 -39.5
EMU TRAINS DEALT WITH NH, KYI/KLYM, RHA & GEDE STATIONS
Page no. 144
COMPARATIVE PARTICULARS OF PUNCTUALITY PERFORMANCE
(AVERAGE UPTO DECEMBER)
SDAH - GEDE SECTION
YEAR SCH RT LT TOTAL RUN OUT
PUNC (%)
MAIN SECTION (SUBURBAN)
2013-14 6707 6211 286 6497 95.6
2014-15 6667 6307 197 6504 97.0
MAIL EXP
2013-14 1721 1637 60 1697 96.5
2014-15 1747 1684 32 1715 98.2
PASSENGER
2013-14 966 814 115 929 87.7
2014-15 1022 919 70 989 93.0
RHA - GEDE
2013-14 1072 1011 47 1058 95.5
2014-15 1083 1045 26 1070 97.6
MAITREE EXP
2013-14 9 8 0 9 94.9
2014-15 9 8 0 8 98.6
Page no. 145
Divn HQ
Rest UP&DN-80KMPH Existing line
NEW UP-: 20 &
70KMPH
new DN-: 20 & 40
KMPH
(04.01.2015)
As approved by CRS/EC for
newly constructed up/dn
line
UP-90KMPH Existing line
NEW DN-65KMPH
(w.e.f-22.09.14)
As approved by CRS/EC for
newly constructed down
line
UP-90KMPH Existing line
NEW DN-50KMPH
(w.e.f-14.03.14)
As approved by CRS/EC for
newly constructed down
line
UP-90KMPH Existing line
NEW DN-70KMPH
(w.e.f-01.12.14)
As approved by CRS/EC for
newly constructed down
line
UP/SUB-
95KMPH
UP/M(K
GK-
KNR)-
90KMPH
........... ...........
DN/SUB-
95
KMPH
........... ...........
DN/M-
90
KMPH
........... ...........
Proposal of raising of speed MPS from 95/90 kmph to 100 kmph in the existing line in SDAH-NH section
5 SDAH-NHQ/L
(SDAH-KNR)
KNR-NH Comm. Line-90KMPH Proposed for 100KMPH
Proposed for 100KMPH
Proposed for 100KMPH
Proposed for 100KMPH
............. .............
............. .............
......... .........
3
BQG-LGL
DN-226/89-
215/46
D/L
2 KNJ-LGL
KNJ-BTY
Dn-127/14-
99/22
D/L
LGL-KNJ
1 KLNP-STB D/L
KLNP-FLU
UP-02/03-
02/17:
20KMPH &
02/17-07/37:
70KMPH
DN-02/24-
02/16:
DETAILS OF NEWLY COMMISSIONED LINES IN SDAH DIVISION WITH MAXIMUM PERMISIBLE SPEED APPROVED BY CRS/EC
Approval AuthoritySpeed
Raised
Vide CPTM
/ER'S L/NOSL NO SECTION
BETWEEN
STATIONS
DIRECTI
ON
OF
TRAFFIC
Approval of S/R
OMS-2000 TRIAL RUN
DONE ON
4
BQG-JJG
DN-215/47-
203.94
D/L ....... .............
.............
.............
.........
.............
.........
.............
05.11.2014
.............
Page no. 146
NO.
OF
TRNS
M/O
AT
GEDE
(DSN)
M/O
AT
PTPL
NO.
OF
TRNS
M/O
AT
GEDE
(DSN)
M/O
AT
PTPL
NO.
OF
TRNS
M/O
AT
GEDE
(DSN)
M/O
AT
PTPL
NO.
OF
TRNS
M/O
AT
GEDE
(DSN)
M/O
AT
PTPL
E.Rly
To
B.Rly
B.Rly
To
E.Rly
TOT 210 186 24 239 227 12 150 140 10 207 201 6
AVG. 17.5 15.5 2.0 19.9 18.9 1.0 16.7 15.6 1.1 23.0 22.3 0.7 -4.8 15.5
MONTH/
YEAR
2014-152013-14
INTERCHANGE WITH BDR RLY. AT GEDE & PETRAPOLE
E.Rly To B.Rly B.Rly To E.Rly
% VARIATION
W.R.T LAST
YEAR
(NO. OF TRNS)
E.Rly To B.Rly B.Rly To E.Rly
COMMODITY M/O To BDR (in wagon)
COMMODITY
TOTAL UPTO DEC
% INCREASE
/ DECREASE
2013 - 14 2014 - 15
RICE 0 0 0.0 WHEAT 2097 2051 -2.2 SUGAR 0 0 0.0
SOYABEAN/ DOC
2346 2779 18.5
MAIZE 265 347 30.9
SALT 0 0 0.0
FERT 0 0 0.0
GYPSUM 84 209 148.8
STONE SLAB 126 0 -100.0
FLY ASH 123 0 -100.0
SLEEPER 138 0 -100.0
IRON 0 0 0.0
PAPER 0 0 0.0
NB WGN (BOT)
135 0 -100.0
EMPTY 161 0 -100.0
OTHERS 39 26 -33.3
TOTAL 5514 5412 -1.8
BDR HOLDING AT SDAH DIVISION
MONTH 2013-
14
AVG. per day
2014-15
AVG. per day
% VARIATION
W.R.T LAST YEAR
TOTAL / AVG
23762 65.1 17688 64.3
TOTAL / AVG
(UPTO DEC)
18767 68.2 17688 64.3 -5.7
Page no. 147
OCCUPATION POSITION OF RUNNING ROOM IN SEALDAH DIVISION UNDER CONTROL OF OPERATING DEPARTMENT
STN NO. OF
ROOM
NO. OF
BED
AVERAGE OCCUPANCY
PER DAY
AVG MEAL / DAY
AVG CONSUMPTION OF LPG /
MONTH
NO OF RR BEARER
NO OF RR
COOK
Gd
Dr
To t.
SS
OR
VA
C
SS
OR
VA
C
GXD 2 8 3 3 6 6 2 2 2 2 2
RHA 7 29 15 13 28 15 4 4 5 4 4
Present Status of CMS Lobby
S.No CMS Lobby
Name Present Status.
2. Ranaghat
Ranaghat CMS lobby is combined with
Operating and Mechanical department where
Power branch provides staff round the clock
by which CMS utilization of all Guards and
Drivers is being done regularly. TRS
department has no lobby at RHA for CMS
utilization.
5/6 Passenger/Goods Guards out of 36 total
Guards are being booked for
Goods/Passenger trains daily in average, so
they perform their Sign On/Off through CMS
when they work Goods/Passenger trains
only otherwise they work EMU trains which
have yet not been incorporated in CMS.
Page no. 148
SS
OR
SS
OR
SS
OR
SS
OR
SS
OR
SS
OR
SS
OR
SS
OR
SS
OR
SS
OR
SS
OR
KYI B1 P/
CABIN6 4 5 3 9 2 8 10 9 7 19 15 3 3 1 1 5 4
PEON - 1 , HDC -
1, SUBS-1
KLYG D - 3 2
KLYS D - 3 3
KLYM D - 3 2
MPJ B1 P/
CABIN4 4 4 4 6 8 6
SMX B1 P/
CABIN6 6 4 4 3 3
PXR D - 3 3
CDH B1 P/
CABIN5 5 4 4 0 0 7 7
PDX B1 P/
CABIN4 4 3 3 4 3
RHA SPL1 RRI
CABIN21 21 3 3 21 21 22 20 14 13 15 7 5 4 14 12
RR COOK - 4-4,
S/MAN- 1, CLERK-
1, R.R.BEARER 4-
4, GD. 42
AG B1 P/
CABIN5 5 4 4 3 3
BGL B1 P/
CABIN4 3 4 4 4 3
MIJ B1 P/
CABIN6 6 3 3 1 1
BPN B1 P/
CABIN4 4 4 2 4 4 1 SUB-1
GXD B1 P/
CABIN6 5 6 7 7 5 4 2 1
COOK 2-2, R.R.
BEARER 2-1,
71 67 5 3 12 5 77 76 44 32 1 1 66 57 22 12 6 5 19 16 0 2
OTHER
CATEGORIES
TOTAL
GATE
MAN
SHUNT
MAN
SHN
TNG
MAS
TER
TNCSUB
S
STAFF POSITION OF KYI - GEDE SECTION AS ON 01.01.2015
STN
CLA
SS
NO.
OF
CABIN
&
TYPE
SM
SWI
TCH
MAN
CABI
NMA
N
PORTE
R
POINTS
MAN
SAFA
IWAL
A
Page no. 149
ORGANISATIONAL CHART OF OPERATING OFFICERS
R.RAMAN
Sr. DOM
A.K.SAHU
Sr. DOM(G)
M. GHOSH
R. MUKHERJEE
A.BARDHAN
K. R. KUMAR
AOM/CHG
AOM/SAFETY
SM/SDAH
AREA OFFICER/CP
Page no. 150
PERSONNEL
I) PERFORMANCE:
i) INDUSTRIAL RELATION:
04 PNM Meetings with ERMU and ERMC have been held. 02 Monthly
meetings held with both ERMU & ERMC Informal Meetings are also held on
various issues from time to time with the representatives of the recognized
Unions.
ii) APPOINTMENT OF RRB & RRC CANDIDATES:
No. of candidates received from RRC No. of candidates physically joined
703 (including ex.serviceman) 543 (including ex.serviceman)
No. of candidates received from RRB No. of candidates physically joined
685 432
iii) Holding RRB, RRC & PET EXAMINATIONS:
This Division had been given responsibility for holding written examinations
of RRB/Kolkata on 23.03.14, 20.07.14, 14.12.14 & 21.12.14 and the same
have been done successfully.
This Division has also been allotted RRC examinations for 05 days (02.11.14,
09.11.14, 16.11.14, 23.11.14 & 30.11.14) and the Division has successfully
conducted the examinations.
Physical Efficiency Test of 3787 candidates conducted by this Division from
26.02.14 to 07.03.14 successfully.
iv) NR & ONR CASES:
Out of 813 Nos. NR cases during January 2014 to December, 2014, payment
of 805 cases have been finalized and out of 229 Nos. ONR cases, 205 have
been settled.
v) MODIFIED ASSURED CAREER PROGRESSION SCHEME:
933 Nos. of staff have been allowed the benefit of MACP from 01.01.14 to
31.12.14.
vi) Benefit of Pay Fixation under RBE 40/2012:
Pay Fixation benefit and various arrear payment have been extended in
favour of 4710 Nos. staff employees amounting Rs.13,37,05,787/-.
Page no. 151
vii) SELECTIONS: (01.01.14 to 31.12.14)
01 Selections& 31 Suitability/Trade Test have been finalized.
viii) SURRENDER OF POST:
Out of targeted surrender of 269 posts, 245 posts have been surrendered during the year 2014. ix) DETAILS OF POSTS CREATED:
The following posts have been created with the approval of competent
authority :
SL
No. Deptt. Designation GP(Rs)
No.
of
posts
Authority No.
1 Engg. Gatekeeper 1800 26 E.174/EL/Creation/Gatekeeper/AS
N-SDAH
2 Elct.G Supervisor-2
& Skilled-7
- 09 MPP/36/BGB/Staff III dt.20.08.14.
3 Optg. Gateman 1800 71 E.261/Creation/T&C-L(R)/
Gateman/53 LC/SDAH/14 dated
28.11.14.
TOTAL 106
x) COMPASSIONATE APPOINTMENT:
Out of 139 cases, 49 have been appointed against Gr.C, 90 appointed
against Gr.D.
xi) REHABILITATION OF MEDICALY DECATEGORISED STAFF:(01.01.14 to
31.12.14)
From January 2014 to 31.12.14 65 staff have been declared medically
decategorised, out of which 60 have been rehabilitated and 05 are yet to be
rehabilitated.
xii) GRIEVANCE CELL:
For quick disposal of staff grievance on line grievance record system has
been introduced in Sept.12. Grievance meetings are being held time to time
under the chairmanship of DRM & ADRM(T).
Page no. 152
xiii) Trade Union Meeting (Calender yearwise) 2013 (Jan-Dec)
2014 (Jan-Dec)
(a) No. of PNM meeting held with ERMC 1 4 (b) No. of PNM meeting held with ERMU 3 4
(c) No. of non-Payment meeting held with ERMC
0 2
(d) No. of non-Payment meeting held with ERMU
2 2 + 1 review meeting
(e) PREM 0 1
xiv) Payment of Settlement dues
2013 (Jan-Dec)
2014 (Jan-Dec)
(a) No. of staff retired during the year 655 813
(b) No. of cases out of (a) above where full payment as permissible was done. 655 805
(c) No. of cases out of (b) above where 100% payment (including Gratuity) could be achieved and nothing kept with held
640 790
(d) Total No. of ONR arising during the year.
309 229
(e) No. of cases out of (d) above settled during the year.
284 205
xv) Safety vacancies under Selection Test & Suitability Test
2013 (Jan-Dec)
2014 (Jan-Dec)
No. of staff promoted
No. of staff promoted
(a) Selection Held 05 96 02 16 (b) Suitability Held 21 500 27 371
xvi) MPs & MLAs Reference 2013 (Jan-Dec)
2014 (Jan-Dec)
(a) Total number of references received separately from MPs & MLAs during the year
26 07**
(b) Out of above, total number of disposed of cases(item 'b' will be finally certified by the head of office)
20 06
** Position of 07 cases (2014) is at Annexure-I
xvii) Holding of Pension Adalat and disposal of complaints
2013 (Jan-Dec)
2014 (Jan-Dec)
(a) Cases pending out of cases received in previous year
Nil Nil
(b) Cases received during the year 74 44
Page no. 153
(c) Total cases (a+b) 74 44
(d) Tenable cases 52 27
(e) Non tenable cases 22 17
(f) Cases finalized 06 10
(g) Cases under scrutiny 31 15
(h) Cases tenable but no financial involvement
15 02
xviii) Reduction in Manpower (S/S) 2012-13 2013-14 (a) Target in terms of number during the
period 270 269
(b) Reduction actually achieved during the period
49 245**
** : Normal surrender-33, Restructuring-141 & for Creation -71= 245
xix) Compassionate Appointment 2013 (Jan-Dec)
2014 (Jan-Dec)
(a) No. of cases waiting at the beginning of the year to be finalised
112 135
(b) No. of fresh cases received during the year
162 128
(c) No. of cases finalized 139 139
(d) No. of cases left over at the end of the year
135 124
xx)
Court cases 2013 (Jan-Dec)
2014 (Jan-Dec)
(a) No. of new cases accrued during the year
215(OB) + 139=354
238(OB)+133=371
(b) No. of cases disposed of during the year
116 80
(c) No. of left over cases at the end of the year
238 291
(d) No. of cases out of (b) above decided in favour of the administration
113 74
(e) Position of contempt cases 10 10**
** Position of contempt cases is at Annexure-II
xxi) Man Power Intake 2013 (Jan-Dec)
2014 (Jan-Dec)
Group C Group D Group C Group D No. of staff recruited (DR Quota from various sources viz. RRB,RRC, GM’s Fresh Face Comp. Apptt., etc)
80 813 432 543
Page no. 154
xxii) REHABILITATION OF MEDICALLY DE-CATEGORISED STAFF:
2013(Jan-Dec) 2014(Jan-Dec) Cases
Received Cases
Disposed Cases
Received Cases
Disposed Gr.C&D 37 21 65 60
xxiii) DPG, EDPG and CPGRAMS Cases:
2013(Jan-Dec) Received Finalised Pending EDPG Cases
42 31 11 DPG Cases CPGRAMS 2014(Jan-Dec)
EDPG Cases 50 38 12 DPG Cases
CPGRAMS
xxiv) Payment of MACP arrears in cases where MACP benefit has been extended w.e.f. 01.01.14 to 31.12.14.
xxv) Finalization of Staff Grievances –
Period No. of Grievance Received
No. grievances disposed off
Pending
2012 1598 233 1365 2013 1518 168 1350 2014 218 160 58
* All registered in Grievance Cell.
xxvi) No. of Seniority List due and published -
Period Seniority List due Seniority List published 2012(Jan-Dec) 52 52 2013(Jan-Dec) 24 24 2014(Jan-Dec) 36 31
xxvii) Ex-gratia payment cases: (Jan-Dec).
Period Total no. of cases
No. of cases already paid
Pending with HQ
Pending with Division at
various level 2013 23 06 00 17 2014 02 02 00 00
No. of cases pay charged Arrear amount paid Rs. 8245 1,72,02,391/-
Page no. 155
II) ASSISTANCE REQUIRED:
i) CREATION OF NEW POSTS
ENGINEERING
S.N Post Nos. Proposal sent vide No.
Current status
01 C-01 D-10
11 Posts
AR/550/Engg/DDC-Biman Bandar/E-15
Proposal sent to CPO on 01.04.13.
02 C-05 D-57
62 Posts
AR/550/Trackman/E-15(KLNP-KNJ)
Proposal sent to CPO on 01.04.13.
03 C-46 D-12
58 Posts
AR/550/BRP-MGT/E-19
Proposal sent to CPO on 01.04.13.
04 C-06 D-65
71 Posts
AR/550/71 Posts/SPR-CG/Engg.
Proposal sent to CPO on 01.10.12.
05 C-03 D-81
84 Posts
AF/550/DBT-LKPR/Engg.
File sent to CPO on 14.06.14 with copy to CE/KKK.
06 D 57 posts
AR/550/MGT-DH/Engg/E-22
Proposal sent to PCE on 29.08.13
07 C-03 D-73
76 posts
AR/550/STB-KLNP/E-22(Engg)
Proposal sent to PCE on 29.08.13.
08 D 70 posts
AR/550/BRP-LKPR/E-22(Engg)
Proposal sent to PCE on 29.08.13.
09 D 07 posts
AR/550/GK/E-22 Proposal sent to PCE on 29.08.13.
10 D 08 posts
AR/550/Gateman/E-22
Proposal sent to CPO on 13.05.13.
11 D-72 C-06
78 posts
AR/550/BQG-LGL/E-22
Proposal sent to PCE on 29.08.13.
12 C-02 D-98
100 posts
AR/550/Engg/BNJ-HB/E-22
Proposal sent to PCE on 11.07.13.
13 C-07 D-68
75 posts
AR/550/KNJ,DHU,MGM,BTY/E-22
Proposal sent to PCE on 11.07.13.
14 C-01 D60
61 posts
AR/550/KNJ-NDP/Engg.
Proposal sent to HQ on 28.12.12.
15 C-11 D-59
70 posts
AR/550/Engg./New case/E-22
Proposal sent to PCE on 19.07.13.
ELECTRICAL-General
SN Post Nos. Proposal sent vide No. Current status 01 AC Wing
C-105 D- 40 TL Wing Gr.C – 29 Gr.D - 11
185 Posts.
Proposal No. AR/550/ AC&TL/185 posts/E-15 dt.29.04.11
Authorization roll(as on 01.04.13) duly vetted by A/cs sent to HQ on 21.11.13 and regarding matching surrender , replied on 18.07.14.
02 C-49 D-20
69 Posts
EL/G/Justificattion/65 Proposal sent to Railway Board on 19.07.12.
Page no. 156
COMMERCIAL
Sl.No. Post Nos. Proposal sent vide No. Current status 1 C 12
Nos. AR/550/CC/Comml
Sent vide No. AR/550/CC/Comml/ to CPO/KKK on 27.06.11.Further reply given. Surrender memo sent to CPO on 14.08.12 as desired.
2 C 504 AR/550/cc/Comml./ 504 posts
Sent vide No. AR/550/CC/ Comml./504 post to CPO/KKK on 01.12.11. Under scrutiny at Divl. Level. As desired by CPO, letter sent to Sr.DCM/SDAH for clarification on 28.01.13, information sent to HQ.
S&T
Sl.No. Post Nos. Proposal sent vide No. Current status 01 C+D 03 Sent to HQ on 28.06.12. 02 C 04 SG/2/4(BT-BNB)/E-19 Relevant papers sent to CPO on
28.07.14. 03 C 03 SG/2/4(SFCO/E-22 Relevant papers sent to HQ on
28.07.14.
Optg.
Sl.No. Post Nos. Proposal sent vide No. Current status 1 C 80 AR/550/2nd
ASM/Optg./E-22 Surrender of 42 posts sent to HQ as on 09.01.15 for creation.
ii) Filling up of vacancy of Law Assistant/Personnel/SDAH.
iii) Filling up of vacancy of WI.
IV. IR related issues:
Regarding opening of staff canteen at TRS Car shed at RHA, a meeting will
be held with the recognized Unions to resolve the issue as per policy guideline of
Railway Board.
Page no. 157
ORGANISATION OF THE DIVISION
The Divisional Railway Manager, Sealdah is assisted by ADRM(O) and ADRM(T) along with – SG, JAG, Sr.Scale and Assistant Officers including Medical Department. The Branch-wise distribution of Officers is furnished below (As on 31.12.14):-
BRANCH
SAG (Rs.37400-67000)
Grade Pay
Rs.10000
SG (Rs.374
00-67000) Grade Pay -
Rs.8700
JAG (Rs.156
00- 39100) Grade Pay -
Rs.7600
Sr. Scale
(Rs.15600-
39100) Grade Pay -
Rs.6600
ASSTT. OFFICERS (Rs.15600-
39100) &
(Rs.9300-34800) Grade Pay -
Rs.5400 &
Grade Pay - Rs.4800
Total
Genl./Admn 3 0 0 0 1 4
Accounts 0 1 0 2 2 5
Civil Engg. 1 3 0 4 13 21
Commercial 0 0 0 2 4 6
Operating 0 1 0 1 4 6
Safety 0 0 1 0 1 2
Mechl.(D&P) 0 0 0 1 3 4
Mechl(C&W) 0 1 0 2 4 7
Elect.(G) 0 0 0 2 3 5
Elect.(TRS) 0 1 0 0 5 6
Elect.(TRD) 0 0 0 2 3 5
Personnel 0 0 0 3 4 7
Stores 0 1 0 0 0 1
S &T 0 0 2 3 6 11
Security 0 1 0 0 3 4
Rajbhasa 0 0 0 0 1 1
Medical 38 18 3 5 8 72
TOTAL 42 27 6 27 65 167
Strength of Personnel Department of Gr.-C and Gr.-D (as on 31.12.14)
Cadre Sanctioned Strength Men on Roll Vacancy
Ministerial 325 270 55
Welfare Inspector 18 13 05
*Including Peons.
Page no. 158
E. STAFF POSITION as on 31.12.14(vetted):
Deptt. GROUP – C GROUP – D TOTAL
S/S O/R Vac. S/S O/R Vac S/S O/R Vac
Elect/TRS 3462 2621 841 1 1 0 3463 2622 841
Elect/TRD 814 732 82 0 0 0 814 732 82
Elect./G 1923 1835 88 1 1 0 1924 1836 88
Elect/TOT 6199 5188 1011 2 2 0 6201 5190 1011
Mech./D 258 162 96 0 1 -1 258 163 95
Mech/P 927 717 210 0 0 0 927 717 210
Mech/C&W 2979 2030 949 1 1 0 2980 2031 949
Mech/TOT 4164 2909 1255 1 2 -1 4165 2911 1254
Trans. 4803 4068 735 2 2 0 4805 4070 735
Comml. 2786 2435 351 1 1 0 2787 2436 351
Civil.Engg 6631 5209 1422 0 0 0 6631 5209 1422
S & T 1397 1203 194 3 2 1 1400 1205 195
Medical 1230 1048 182 5 5 0 1235 1053 182
G/Admn. 103 78 25 3 2 1 106 80 26
Personnel 355 306 49 1 1 0 356 307 49
Stores 0 0 0 0 0 0 0 0 0
TOTAL 27668 22444 5224 18 17 1 27686 22461 5225
Page no. 159
E. SUMMARY SHEET OF SAFETY VACANCY POSITION AS ON 31.12.14
Sl.N
o.
Category SS VACANCY Persentage of
Vac. to SS DR PR TOT
1 ASMs/SMs/SS 815 29 44 73 8.96%
2 Controllers 47 -2 9 7 14.89%
3 Guards 676 -60 133 73 10.80%
4 Switchman 99 0 25 25 25.25%
5 Gateman(Traffic) 542 69 0 69 12.73%
6 Cabinman/ leverman 124 0 36 36 29.03%
7 Leverman 27 0 14 14 51.85%
8 Pointsman 575 34 136 170 29.57%
9 Shunting Staff 446 -3 132 129 28.92%
10
(A) Driver (Electric) 1267 0 562 562 44.36%
10
(B) Driver (Diesel) 561 14 131 145 25.85%
11 JE/SE/SSE
(P.Way) 134 18 24 42 31.34%
12 Gangmate 178 0 22 22 12.36%
13 Keyman 211 45 0 45 21.33%
14 Track Man 3524 601 0 601 17.05%
15 Gatekeeper (Engg.) 717 72 0 72 10.04%
16 JE/SE/SSE (Signal) 66 0 -13 -13 -19.70%
17 SIM 307 -11 43 32 10.42%
18 JE/SE/SSE(C&W) 247 14 58 72 29.15%
19 Safety
Inspectors/Counsellors of 6 0 0 0 0.00%
Page no. 160
all Deptt.
20
All other safety
categories(not specified
above) as per Board's
letter dt. 01/05/02 as
amplified
4262 2 777 779 18.28%
TOTAL 14831 822 2133 2955 19.92%
F. WELFARE ACTIVITIES -
i) Co-operatives
There are 09 Co-operatives in this division. The locations are at SDAH,
SPR, BGB, DDJ, BT, BNJ, NH, RHA & KNJ.
ii) Homeopathic & Ayurvedic Centres
Homeopathic Dispensaries is available adjacent to DRM/Building/SDAH
Honorarium being paid from CSBF.
iii) Railway Institutes
There are 06 Railway Institutes in this Division. The locations are at
SDAH, SPR, GHPR, NH, RHA & DKD.
iv) Officers Club
There is one Officers’ Club exists in the division located at DRM Building
Office Complex.
v) Canteen
In the division there are 6 canteens located at DRM Bldg./SDAH, Car
Shed Canteen/NKG, Car Shed Canteen/SPR, Carriage & Wagon
Canteen/SDAH, Diesel Shed Staff Canteen/BGA, DTS Staff Canteen/CP
vi) Community Hall: Naihati and Sonarpur
vii) Railway School:There are 05 ATP Schools in Bengali Medium and they
are located at DH, HLR, NH, BNJ & KNJ. But out of 5 ATP Schools, 3 ATP
Schools at KNJ, BNJ & NH have been closed since 31.12.14.
viii) Crèche: Crèche near to DRM Building, Sealdah exists.
Page no. 161
Hostel: Boys Hostel at Rly quarter No. Rly.Qrs. No.131/B(Type-III)Kaiser
Street, Sealdah but not funactional.
viii) Divisional Cultural Association
DCA performed in various programmes throughout the year.
ix) Scouts and Guide
They take part in various activities like Republic day, Independence day
and assist Railway Administration in crowd management during Puja
rush etc through out the year.
x) Distribution of SBF grant
CSBF – Utilisation of Funds -
Sl. Head Amount Allotted Amount spent
1 Funeral Assistance 4,75,000/- 3,40,000/-
2 Family Assistance 1,75,000/- 30,152/-
3 Cultural Activities 94,000/- 4,000/-
4 Homeopathy/Ayurvedic 13,991/- + 4,999/- 18,990/-
5 Trip of lady employees Nil Nil
6 Sports(ATP) 10,000/- 10,000
7 Fresh Air Camp 4,25,000/- Camp to be organized.
IV) IR related issues:
Regarding opening of staff canteen at TRS Car shed at RHA, a meeting will
be held with the recognized Unions to resolve the issue as per policy
guideline of Railway Board.
Page no. 162
MP/MLA reference cases:
SL No.
Name of MP/MLA
Name of complainant & date of receipt
Nature of complaint
Reply in brief Remarks
1 Sashi Ch.Yadav,MP
Joy Prakash Kumar on 03.04.14
Transfer from SDAH to Jamalpur
Competent authority has rejected the appeal due to large number of vacancy.
Replied vide letter No. E-18TR/Misc/Tech. (Elect)/ 2014 dated 06.06.14.
2 Arjun Singh,MLA
Pratap Ch.Rai on 20.05.14
For revocation of charge
Sr.DCM opined that “Time barred case. No status for dealing such case at this stage.”
Replied vide letter No.E3/A2242(E3) dated 13.06.14.
3 Tariq Anwar, MP
Kapil Deo Mondal on 12.09.14
Own request transfer from SDAH to Katihar Divn.
Sr.DSTE refused the case due to acute shortage of SIM in SDAH Division.
Replied vide letter No.81/E-12/Transfer of Gr.D&C/S&T dated 16.09.14.
4 Jyoti Priya Mallick, MLA
Manas Chakraborty on 24.12.14
Transfer from BNJ sec. to DDJ/CP
He is posted at CP from 10.02.12
Replied vide letter No. E-5/A 3730(E-3) dated 02.01.15.
5 Madan Mitra, MLA
Dipak Kanjilal on 24.12.14
Irregular transfer by Sr.DCM/SDAH
Case transferred to Sr.DCM on 12.01.15.
Pending as on 31.12.14.
6 Jyoti Priya Mallick, MLA
Ashis Kr.Bhagat on 24.12.14
Transfer from SDAH Divn.to ASN
Transferred to ASN on 20.05.11.
Replied vide letter No. EG/Misc/ECRC&TC/ E-3 dated 20.05.11
7 Jyoti Priya Mallick, MLA
Nikhil Chandra Malakar on 24.12.14
Transfer from Jaysingpur to SDAH Divn.
Since it is matter of Zonal Railway, the case referred to CPO
Replied vide letter No. EG/L/REF/CA-III/MP/MLA/E-2 dated 01.01.15
Page no. 163
POSITION OF CONTEMPT CASES AS ON 12.01.2015
Sl
N
o
Case no.&
Applicant
Court Contemnors Order date
& operative
part
Position of
implement
ation
Relief
sought for
Next
date of
hearing
REMARKS. Advocate
1 2 3 4 5 6 7 8 9 10
1 CPAN-2010
arising out of
WP 6597/08
North
Calcutta
Labour &
Construc
-tion Society
t)Coal & Ash
OS/C
HC/
CAL
G.M./E.Rly
CPO/E.Rly
DRM/SDAH
Sr.DPO/SDA
H
WP order
dt. 8.5.10
with
direction
the case to
consider
the case
within six
weeks in
accordanc
e
with Policy.
Initially Rly.
filed CAN
No.
5474/09
arising out
of WP
No.6597(W
)/08 for
extension
of time and
ultimately
case has
been
disposed
of by
passing a
speaking
order.
.Absorption
in group –
D post.
Case
is not
coming
up
for
hearing
till date.
Broadsheet has
been prepared
for 20(twenty)
candidates and
they have been
invited for
hearing on
14.01.2015 &
Broadsheet for
the remaining
candidates is
under process.
2 CPAN
No.14/10
(OA 114/06)
CAT/Patna.
Dashrath
Roy
E-13
CAT/
PATN
A
Ex.Sr.DPO/
E.Rly/SDAH
Z.G.
Firdausi
Order
passed on
09.03.07.
For
payment of
DCRG
Finally final
reply is
forwarded
to RA .and
the same
is received
by RA on
17.9.2014
Promo-
tion and
non-
payment of
DCRG
Due to
non-
vacatio
n of
Rly.
quarter
the
order
has not
been
complie
d.
The advised by
R.A. verbally, the
Affidavit in non-
judicial stamp
paper duly
signed by Sr.
DPO/SDAH is
forwarded to
R.A. ON
28.11.2014.
Mukund
jee,
Patna
Court.
3 CPC
NO.56/13
OA
NO.275/10
Mihir Kr.
Ghosh
E-18/TR
CAT/
CAL Mr. S.Das
DRM./SDAH
Sri Arjun
Taboiyar
CPO/E.RLY
Rabi Kumar
Sr.DPO/
SDAH
S.K.
Karmakar
Sr.DEE/TRS
OANO.275
/13
Order
passed on
Dt.23.07.2
013
seniority &
promotion
22.01.15 Seniority list
has been
published on
03.12.14.
Next date has
been fixed on
22.01.2015
Priyabrata
Mukherjee
4 CPCNO.350/
00133/2014
Sujit kr.
Ghorai
E-3
CAT/
CAL
R.K.Gupta
G.M./E.RLY.
S,B.Baskey
DCM/SDAH
Ravi kumar
Sr.DPO/SDA
H/E.Rly
Order
dt.03.5.13
Order
already
complied
but
contempt
petition
filed by the
petitioner.
.Non
payment of
retrial
benefit
26.02.15 Reply sent to
R.A.on
dt.25.7.2014
B.L.Gango
Padhyay.
Page no. 164
5 CPC NO.350/
00191/2014
Swadesh
Priya
Bandopadhya
y
E-1
CAT/
CAL
Sri
R.K.Singh/
G.M./E.Rly.
Sri S.Bhatta-
Charjee,CP
O
.Smt. Jaya
Verma Singh
DRM/ SDAH
Sri
Umashish
Lahiri
Sr.DPO/SDA
H
Non
compliance
of
CAT/CAL’s
Order
dated
26.9.2013
Passed in
OANO.120
1/13
Sr. LO’s &
DRM/SDA
H’s
approval
has been
obtained.T
he bill has
been
prepared
and send
to A/C’s on
28.10.14
for final
checking
and
payment.
Non
payment of
arrear pay
allowances
26.02.15 An amount of
Rs.56415/-
vide co7
no.003/2640dt
.11.11.14 &
amounting
Rs.40103/-
vide co7
no.003/2639dt
.11.11.14 have
been
passedtoward
s payment of
arrear pay &
allowance.The
same has
been informed
to R.A.
through letter
no.E-1/
Estt/court case
dt.13.11.14.
Apurba Kr.
Banerjee
6 CPCNO.350/
00194/2014
OANO.422/13
Sukanta
Mondal
E-3
CAT/
CAL Mr.
Ramkumar
Gupta,G.M./
E.Rly.
Mr.Sushova
n
Bhattachary
a.
CPO/ERly.
Non
compliance
of
CAT/CAL’s
Order
dated
01.10.2013
Passed in
OANO.422
/13
SLP filed
SLP
NO.21599
OF
2014.
Terminatio
n of
service
Sr.DPO/SDAH
&APO(C&S)/S
DAH
Visited
Supreme
Court
On 03.12.2014
and affirmation
was made by
Sr.DPO/SDAH
on 03.12.2014
Subrata
kr.Das
7 CPC.
NO..........
............2014
OA
NO.350/0000
7/2014
Smt.Mousumi
E-18/TR
CAT/
CAL Mr.Ram Kr.
Gupta
G.M/E.Rly
Ms.Jaya
Verma Sinha
DRM/E.Rly/
SDAH
Non
compliance
of
CAT/CAL’s
Order
dated
23.4.2014
Passed in
OANO.350
/00007/14
.Ex-Gratia
Lump sum
compensat
ion
Along with
interest.
Target
date
within
31.01.15
File is sent to
Sr.DPO/SDAH
for
approaching to
DRM for
DRM’s
recomendation
as per JPO
issued by CPO
(A) and
FA&CA(F&B).
DRM/SDAH
has been
recommended.
The file of
papers is
ready to send
to CPO/CCC
for obtaining
GM/E.Rly ‘s
sanction of
ex.lumpsum
compensation.
Sri Balailal
Lal
Gangopad
hyay
Page no. 165
8 CPC NO.350/
00135/2014
OA
NO.722/12
Smt.Laxmi
Banerjee
E-8
CAT/
CAL
Ms.Jaya
Verma Sinha
DRM/E.Rly/
SDAH
Non
compliance
of
CAT/CAL’s
Order
dated
14.5.2013
Passed in
OANO.722
/2012
The Reply
handed
over to the
R.A. On
05.11.14.
Conferenc
e held with
R.A.
on11.11.14
.
The Case
is
adjourned
to 20.01.15
. To
release the
retirement
benefits
and
pension.
20.01.15 . Subrata
Kr. Das
9 CPC NO.350/
00007/2014
OA
NO.1357/10
Smt.Hasna
Banu,
W/O,Lt.
Jamaluddin
Ex.fitter/TRS/
SPR under
Sr.
DEE/TRS/SD
AH.
E-18/TR
CAT/
CAL Mr.Ravi
Kumar
Sr.DPO/SDA
H
Non
compliance
of
CAT/CAL’s
Order
dated
15.10.2012
in
OANO.135
7/2010
Speaking
order
issued by
Sr.
DPO/SDA
H
DT.30.10.1
4 has
already
been send
to the
applicant.
Payment
of all dues
including
death cum
pensionary
benefits
13.01.15 Priyabrata
Mukherjee
10 CPAN
NO.183/
2014
WPCT
NO.196/
2007
WPCRCNO.
185/2014
Jayanta
Kr.Das
E-4
HC/C
AL G.Z.Firdousi SLP Filed.
Information
received
from OS/E
-4sec .
SLPNO..20
578/14
Consolidat
ed TA
16.01.15
Petition has
been received
from R.A. and
reply filed..
Stating
position of
filing SLP
no.20578 of
2014
Before
Supreme
Court..;
Swapan
Banerjee
Page no. 166
ORGANISATION OF PERSONNEL DEPARTMENT
Sr.DPO U.Lahiri
DPO, N.Majumdar APO(M&E), D.C.Murmu APO(T&C), S.Kumar APO(ESM), R.K.Roy APO(C&S), A.K.Chakraborty
---------------------
Page no. 167
SAFETY
I) PERFORMANCE:
COMPARATIVE POSITION OF ACCIDENT CASES DURING LAST THREE YEARS
INCLUDING 2014-15
Railway Board Cases
2012-13 2013-14 (Dec.’13) 2014-15 (Dec.’14)
Passenger 01 01 02
Goods 00 00 00
Total Cases 01 01 02
1 1
2
1 1
2
0
0.5
1
1.5
2
2.5
3
3.5
4
4.5
2012-13 2013-14(Dec.'13) 2014-15 (Dec.’14)
Passenger Goods Total Cases
Page no. 168
COMPARATIVE POSITION OF ACCIDENT CASES DURING LAST THREE YEARS
INCLUDING 2014-15.
Railway Board Cases.
Consequential
Type of
Accident
2012-13 2013-14(Dec.’13) 2014-15 (Dec.’14)
P G T P G T P G T
Collision - - - 01 - 01 - - -
Derailment 01 - 01 - - - 02 - 02
L/C Gates - - - - - - - - -
Total 01 - 01 01 - 01 02 - 02
Indicative
Type of
Accident
2012-13 2013-14 (Dec.’13) 2014-15 (Dec.’14)
P G T P G T P G T
Disregarding
of Signal
- - - - - -
- - -
Total - - - - - - - - -
Status of D&AR action
2012-13 2013-14(Dec.’13) 2014-15(Dec.’14)
Total Finalized Pending Total Finalized Pending Total Finalized Pending
01 01 - 01 01 - 02 - 02
Page no. 169
COMPARATIVE POSITION OF ACCIDENT CASES DURING LAST THREE YEARS
INCLUDING 2014-15.
HEADQUARTERS CASES
2012-13 2013-14(Dec.’13) 2014-15(Dec.’14)
Passenger 00 01 00
Goods 00 01 00
Total Cases 00 02 00
0
1
0 0
1
0 0
2
0 0
0.5
1
1.5
2
2.5
3
3.5
4
4.5
2012-13 2013-14(Dec.'13) 2014-15(Dec.’14)
Total Cases
Goods
Passenger
Page no. 170
COMPARATIVE POSITION OF ACCIDENT CASES DURING LAST THREE YEARS
INCLUDING 2014-15.
HEADQUARTERS
Consequential
Type of
Accident
2012-13 2013-14(Dec.’13) 2014-15(Dec.’14)
P G T P G T P G T
Collision - - - - - - - - -
Derailment - - - - 01 01 - - -
L/C Gates - - - - - - - - -
Total - - - - 01 01 - - -
Indicative
Type of
Accident
2012-13 2013-14 (Dec.’13) 2014-15(Dec.’14)
P G T P G T P G T
Disregarding
of Signal
- - - 01 - 01
- - -
Total - - - 01 - 01 - -
Status of D&AR action
2012-13 2013-14(Dec.’13) 2014-15 ( Dec.’14 )
Total Finalised Pending Total Finalised Pending Total Finalised Pending
- - - 02 02 - - - -
Page no. 171
COMPARATIVE POSITION OF YARD & SIDING DERAILMENTS DURING LAST
THREE YEARS INCLUDING 2014-15.
2012-13 2013-14(Dec.’13) 2014-15(Dec.’14)
Yard 28 07 00
Siding 06 00 00
TOTAL 34 07 00
28
6
34
7
0
7
0 0 0 0
5
10
15
20
25
30
35
40
Yard Siding TOTAL
2012-13 2013-14(Dec.'13) 2014-15(Dec.’14)
Page no. 172
Department-wise analysis of Yard & Siding derailments.
Yard
Siding
Department
2012-13
2013-14
(Dec.’13)
2014-15
(Dec.’14)
2012-13
2013-14
(Dec.’13)
2014-15
(Dec.’14)
Engineering 12 03 - 01 -
Operating 10 04 - 05 -
Mech.(C&W)
-
Mech.(D&P) 01
-
Elec/TRS/TRD
-
S&T
-
Miscellaneous 02
-
Combination 03
-
TOTAL 28 07 - 06 - ---
Page no. 173
SAFETY MEASURES FOR ACCIDENT PREVENTION
SL Items Monthly
target 2012-13
2013-14
(Up to Dec.)
2014-15
(up to Dec.)
1. Inspection 1783 30194 26636 27288
2. Surprise Night Inspection 28 6098 4615 4707
3. Safety Audits 02 36 29 41
4. Safety Seminars 06 67 66 83
5. Level Crossing Inspection 40 4848 4199 5371
6. Safety Drives - 37 34 54
7. Counseling of Staff - 9651 7372 10435
8. Surprise Mobile Breath
analyzers test for Drivers 10 1054 810
921
9. Checks on Over Speeding - 1204 948 1323
10.
Monitoring of functioning of
loco Inspectors of Elect. &
Mech. Deptt. towards crew
counseling.
30 431 351
367
11. Fire fighting - 187 197 207
12. Checking on securing of
vehicle - 662 615
723
13. Monitoring on setting of
Points against Blocked line - - 443
602
Page no. 174
Overdue Refresher Course Training ( Up to 31.12.2014)
Category. Sanc.Strength On Roll Vacancy.
( On %age)
Overdue
Remarks
Drivers
(Elec.) 787 605 23.12 00
Drivers
(Dsl.) 279 262 6.09 00
Astt.Dr.
(Elec.) 278 32 88.48 00
Astt.Dr. (Dsl.) 249 124 50.20 00
SMs 815 719 11.77 03 Long sick
Guard 714 642 10.08 04
Long sick-03
Retirement -01
Overdue Periodical Medical Examination ( Up to31.12.2014)
Category Sanc.
Strength On Roll
Vacancy
(%)
Over due
Remarks
Drivers
(Elec.) 787 605 23.12 00
Drivers
(Dsl.) 279 262 6.09 00
Astt. Dr. (Elec.) 278 32 88.48 00
Astt. Dr. (Dsl.) 249 124 50.20 00
SMs 815 719 11.77 03 Long sick
Guard 714 642 10.08 04
Long sick-03
Retirement -01
Page no. 175
SOME OF THE ACTIONS INITIATED TO ACHIEVE 100% SAFETY
• Safety Audit at Officers’ Level.
• Safety Seminars with Interactive Sessions, Counseling & Safety Drives.
• Intensive Inspections & Surprise checks during WEE hours.
• Surprise Night Inspections, Ambush Checks.
• Intensive Inspections & Surprise checks at L.C. Gates,
• Footplate Inspections including Joint Footplate Inspections by Officers
and Supervisors.
• Instant disposal of deficiencies.
• Availability of safety equipments.
• Frequent and surprise Breath- Analyzer Test.
• Intensive Summer, Monsoon and Winter patrolling and appropriate
precaution.
• Educative Counseling with practical demonstration on Fire fighting,
use of Crank handle etc.c
• Regular Safety meeting with Branch officers at DRM’s level.
• Social awareness Campaign to educate road users in the rural areas, Bus
and Taxi stands about precautions to be taken while passing at
unmanned level crossing Gates.
• Alert message through SMS & Publication of posters and Handouts.
• Inspection Mock drill of ART/ARME/ARMV and Crane.
• Monitoring on Setting of Points against Block line.
• Monitoring on training at Divisional Training School.
Mock Trial of Sealdah Division.
Year ART Mock Drills ARMV Mock Drills
BGA RHA BGA RHA
2013-14 11.02.14 20.03.14
01.02.14 20.08.14
2014-15 28.11.14 19.10.14
13.01.15
28.11.14 19.10.14
13.01.15
Page no. 176
II) ASSISTANCE REQUIRED:
� One Officer either in Jr.Scale or Sr.Scale is required to assist Sr.DSO.
� Manning of all un-manned ( 37 nos.) Level Crossing Gates.
� Provision of Sliding Barrier at all interlocked Level Crossing Gates.- At present
sliding barriers have been provided at 36 nos. of gates. Remaining 45 nos. Gates
needs to be provided with sliding barriers.
� All yellow “A” Marker light in Semi Automatic Signalling territory may be
replaced with white light as per GR 3.17(i).
� To eliminate mixed working system, Token Block working at Debagram –
Rejinagar and Beldanga – Murshidabad section may be replaced with UFSBI.
STATUS OF RUNNING ROOMS
Sl. No
Place Nominated
Nodal Officer
Total Rooms & Beds
Occupations
No. of LPG
cylinders allotted
Drinking water. (AQUA
GUARD)
Coordinating officer
No. of
Rooms
No. of Beds
Guard Driver
1 KRP Sr. DEN/C 6 34 10 18 12 Provided SM/SDAH
2 KNJ Sr.DSO 3 8 3 4 02 Provided AO/CP
3 RHA Sr.DOM 8 35 15 16 04 Provided AO/CP
4 STB Sr.DME 6 13 6 6 03 Provided AOM/C
5 GEDE Sr.DSTE 4 8 3 3 02 Provided AOM/Safety
6 NH/YD Sr.DOM/G 4 15 8 6 04 Provided AME/C&W
7 BNJ Sr.DCM 10 24 12 12 04 Provided AEN/RHA
8 HNB Sr.DEE/TRD 5 14 6 6 02 Provided AME/Power
9 CG Sr. DEE/G 4 12 5 7 02 Provided AEE/TRS/OP
10 DH DME(D&P) 8 16 6 10 02 Provided AEE/TRS/BT
11 LKPR Sr.DEN/II 5 23 11 11 03 Provided AEE/TRS/SPR
12 DDJ Sr.DEE/TRS 4 14 0 14 05 Provided AEE/TRS/SPR
Page no. 177
STATUS OF REST ROOMS
Sl No
Place Controlling Branch
Total Rooms & Beds
Drinking water (AQUA GUARD)
Nominated Nodal Officer
No. of Rooms
No. of Beds
1 SDAH Guard
OPTG 2 42 Provided Sr.DEN/C
2 Kolkata Terminal OPTG 1 6 Provided Sr. DEN/I
3 Naihati Station OPTG 2 9 Provided Sr.DOM/G
4 Dum Dum Jn. OPTG 1 4 Provided Sr.DEE/TRS
5 Kolkata Terminal TRS 1 6 Provided Sr. DEN/I
6 SDAH
Loco Pilot TRS 1 27 Provided Sr.DEN/C
7 SDAH
Loco Pilot TRS 1 17 Provided Sr.DEN/C
8 NAMKHANA OPTG. 1 04 Provided Sr. DOM/G
Details and locations of accident relief trains, crane and Medical Vans.
Locations Class
Type of
Heavy
Re-railing Equipment
Jurisdiction.
Staff
Gr.”C” Gr.”D”
ART
&
SPART
Beliaghata
A LUKAS
(Air Brake)
Sealdah – Kalyani (Excl.),
Kankurgachi Chord – Sealdah
South Section,
Dum Dum Jn. – Dankuni
(Excl.),
Dum Dum Jn. – Bongaon Jn.,
Hasnabad– Barasat.
23 06
SP LUKAS
(Air Brake)
Entire Kolkata Goods &
Coaching Complex,
Kolkata Terminal, Chitpur Yard
and
Circular Railway.
Ranaghat B LUKAS
(Air Brake)
Ranaghat Jn. –
KalyaniSimanta,
Ranaghat Jn. – Shantipur,
Ranaghat Jn. – Bongaon Jn.,
Ranaghat Jn. – Gede,
Ranaghat Jn. – Lalgola.
17 01
Page no. 178
CRANE Beliaghata
140 Ton.
(Air Brake) Entire Division. 13 05
ARME
Beliaghata
Air Brake
Sealdah – Kalyani (Excl.),
Kankurgachi Chord – Sealdah
South Section,
Dum Dum Jn. – Dankuni
(Excl.),
Dum Dum Jn. – Bongaon Jn.,
Hasnabad – Barasat.
Entire Kolkata Goods and
Coaching Complex,
Kolkata Terminal, Chitpur Yard
and
Circular Railway.
02 05
Ranaghat
Air Brake
Ranaghat Jn. –
KalyaniSimanta,
Ranaghat Jn. – Shantipur,
Ranaghat Jn. – Bongaon Jn.,
Ranaghat Jn. – Gede,
Ranaghat Jn. – Lalgola.
05 08
• In addition ARME/Scale-II are available at KRP , NH and BT.
Page no. 179
REPORTABLE TO RAILWAY BOARD (2014-15)
Pending D&AR Case.
SL
No
Date Location Brief of
Accident
Cause Responsibility Action taken
1.
14.08.14
KLNP-
FLU
Derailment
of 31521
SDAH-STB
EMU local
passenger
train.
The incident
happened
due to un-
authorized
movement of
material
trolley of
TRD
/Constructio
n
department
on the
running line
by the
contractor
staff
including
slack
supervision
of nodal
supervisors
and
delayed
reaction on
the part of
the train
crew
Primary;
1.M/s Sikka
Engineering
2. Sri Bidhan
Mukhopadhyay
SSE/TRD/Con
./ SDAH.
Secondary:
a) Sri I.C.
Chaudhury,
LPP/SDAH.
b) Sri TusherKanti
Pal, Guard/SDAH.
Rs.1,51,387/-has been
realised from M/s.Sikka
Engineering for damage
to Rly. Property. Letter
issued to Dy. CE/Con.
for enhancement for
penaltyon
11.11.14.Further letter
issued on
03.12.14.Abillamounting
Rs.1,45,413/ was
prepared by Sr. DME
towards restoration
charge for utilisation of
ART which has been
sent to Dy.CEE/Con. on
24.12.14 for realisation
fromM/s.SikkaEngg.
SF-5 has been issued by
Dy. CE/ Con on 03.09.14
Acknowledged on
16.09.14. DEN/Con.-II
has been nominated E.O
on 30.10.14. Enquiry
officer has been
changed(Sri V. Nath,)
DEE/Con./III /SDAH
and DA enquiry held on
27.11.14, 05.12.14 &
12.12.14. Enquiry on
17.12.14 & 12.01.15
could not be held due to
non-attendance of
defence helper & witness
respectively.
Next date has been fixed
on 20.01.2015.
Stoppage of increment
for one year(N.C)
Stoppage of increment
two years(N.C).
Page no. 180
2. 13.10.14 Betn.
TLX-
GOF
Derailment
of 34527
up (CG-
SDAH)
EMU local
passenger
train.
Entangleme
nt of Crow
bar with the
LHS wheel
of SDAH end
trolley.
Primary:
i )
M/s.Chatterjee
& Company
ii)Sri Ravi
Prakash,
JE/II/P.Way/
SPR
Blameworthy
Sri N.C.Mandal
LPP.
Sri S.K.Verma,
Guard
Refd. to Sr. DEN on
28.10.2014. Restoration
charge Rs.1,46,015/-
has been sent to Sr.
DEN/II on 22.12.14 for
realization from
M/s.Chatterjee & Co.in
addition to cost of
damage of Rs.97,453/-
SF-5 issued on
11.11.14. Sri S. Sen,
AEN/Bridge has been
nominated E.O.
Enequiry held on
19.12.14 &
08.01.15.Next date
has been fixed on
04.02.15.
Stoppage of increment
for two years(N.C).
Warned.
Page no. 181
SIGNAL & TELECOMMUNICATION
I) PERFORMANCE
Performance of Corporate Plan (S&T) for the Year 2014-15
Sl. No.
Item Unit Proportionate Target
of 2014-
15
Achievement
(Apr'14 -
Dec'14)
Achievement in Percent
age
Achievement
(Apr'13 -
Dec'13)
Achievement w.r.t. previous year in
Percentage
(A) (B) [C=(B/A) x 100]
(D) [E={(B-D)/D} x 100]
1 Regular Directed Maintenance.
Stn. 80 98 123% 64 53%
2 Safety Integrity test as per SEM and for EI once in every 5 years.
Stn. 80 91 114% 52 75%
3 Provision & Replacement of Glued Joints in lieu of IBJ on the main line.
No. 150 440 293% 416 6%
4 Replacement of old/worn-out Point Machines by IRS type M/C.
No. 38 98 258% 33 197%
5 Replacement of batteries (Cells).
No. 1125 2794 248% 2360 18%
6 Technical audit /right sizing of Power Supply and its Modules at stations undergoing modification/new works.
Stn. 80 107 134% 49 118%
7 Overhauling of Lever Frames.
No. 4 5 125% 0 -
8 Replacement of defective quad/signalling cables.
Km 8 11 141% 7.6 49%
9 Providing lightning protection arrangements (B, C & D).
Stn. 5 7 140% 0 -
Page no. 182
Sl. No.
Item Unit Proportionate Target
of 2014-
15
Achievement
(Apr'14 -
Dec'14)
Achievement in Percent
age
Achievement
(Apr'13 -
Dec'13)
Achievement w.r.t. previous year in
Percentage
(A) (B) [C=(B/A) x 100]
(D) [E={(B-D)/D} x 100]
10 Exothermic bonds/ Pin Brazing for Track circuits & earthing connection for Track circuits & earthing connection.
No. 375 629 168% 228 176%
11 Inverter/IPS (Low capacity) at interlocked L.C. Gates.
LC 8 9 113% 8 13%
12 ELBs with improved Boom Locking arrangement.
No. 8 8 100% 4 100%
13 Modification of Track circuits as per IRSEM (Series TC).
Stn. 80 107 134% 23 365%
14 Provision of Data loggers at existing MACLS stns. with networking.
Stn. 1 5 500% 3 67%
15 Modified LED Signal/ Modified CRU.
Stn. 4 5 125% 4 25%
16 Standby Fuse for outdoor circuits (PPTC) / Changeover.
Stn. 8 11 138% 28 -61%
17 Slide Boom type Gates at L-Xing within Station Limit.
No. 8 2 25% 0 -
Page no. 183
MONTH-WISE SIGNAL FAILURES OF SEALDAH DIVISION FOR THE YEARS 2012-13, 2013-14 & 2014-15
(APRIL TO DECEMBER)
II) Break-up of Signal Failures – department wise &
due to other major causes
Department/ Major Causes
Signal Failure for the
month of Dec'13
Signal Failure for the month
of Dec'14
Total Signal
Failures (Apr'13 - Dec'13)
Total Signal
Failures (Apr'14 - Dec'14)
Percentage Increase/
Decrease of Signal
Failures w.r.t. previous year
(A) (B) (C) (D) [E={(D-C)/C} x 100]
S&T 121 122 1353 1348 -0.37%
Operating 82 97 888 792 -10.81%
Engineering 81 78 634 639 0.79%
Electrical 1 4 73 77 5.48%
0
50
100
150
200
250
300
350
400
450
500
APR MAY JUN JUL AUG SEP OCT NOV DEC
2012-13
2013-14
2014-15
YEAR APR MAY JUN JUL AUG SEP OCT NOV DEC
TOTAL
2012-13 323 356 325 358 441 416 345 328 330 3222 2013-14 398 348 327 335 404 399 328 426 330 3295 2014-15 467 381 420 417 371 356 336 384 387 3519
Page no. 184
Mechanical 3 0 7 5 -28.57%
Misccreant 22 19 231 296 28.14%
Miscellaneous 2 4 22 21 -4.55%
Bad weather 0 0 49 42 -14.29%
RE/ Construction
18 63 38 299 686.84%
Grand Total :- 330 387 3295 3519 6.80%
EMU Train Loss on S&T Account
Total EMU Loss in 2013-14
(Apr – Dec)
Total EMU Loss in 2014-15
(Apr – Dec)
Percentage of Variation
1924
1086 -43.55%
III) gnificant A) SIGNAL :
1) Commissioning of Elctronic Interlocking (EI) :
Electronic Interlocking (EI) system commissioned at 4 Nos. of Stations –
DHU (Ansaldo-make), MGM (Ansaldo-make), BTY (Ansaldo-make) and JJG
(GE-make), replacing the old SM Slide Interlocking systems – during this year.
2) Commissioning of Automatic Signalling System :
Automatic Signalling System commissioned in BBT-MMG and MMG-BT
sections during this year, replacing the Absolute Block Signalling System in
those sections.
3) Commissioning of Double Line Working in Place of Single Line Working :
Double Line Working Commissioned in place of Single Line Working in
KNJ-DHU, DHU-MGM, MGM-BTY and BQG-JJG sections during this year.
4) Improvement of L.C. Gates :
(a) Interlocking of L.C. Gates :
7 Nos. of Non-interlocked L.C. Gates Interlocked during this year –
3/C/E/BT, 4/C/E/BT, 74/C/E/DHU, 78/C/E/MGM, 17/C/E/BNJ,
149/C/E/JJG and 152/C/E/JJG.
(b) Provision of Electrically-operated Lifting Barrier (ELB) at L.C. Gates :
Page no. 185
Electrically-operated Lifting Barrier provided at 9 Nos. of L.C. Gates –
9/B/T/AQR, 3/C/E/BT, 4/C/E/BT, 70/B/E/DHU, 72/S/E/DHU,
81/S/E/BTY, 17/C/E/BNJ, 17/B/T/DTK and 13/S/T/BP – during this
year.
(c) Provision of Slide Boom-type Gate of New Design :
Total 2 Nos. Slide Boom-type Gate of New Design provided during this year
at L.C. Gate Nos. 4/S/T/MJT (replacing the earlier slide gate) and
15/B/T/BMG.
(d) Provision of UPS/ IPS-feeding at L.C. Gate :
UPS/ IPS-feeding provided at total 9 Nos. of L.C. Gates during this year –
3/C/E/BT, 4/C/E/BT, 17/C/E/BNJ, 10/B/E/BT, 7/C/E/BBT,
9A/C/T/MMG, 7A/E/MMG, 6/B/E/BBT and 13/S/T/BP.
5) Reliability Improvement in Power Supply :
(a) Provision of Integrated Power Supply (IPS) System :
1 No. of IPS newly provided at KOAA SSI Hut during this year.
(b) Replacement of old IPS System :
Total 12 Nos. of old IPS Systems replaced during this year at KDH, DHU,
MGM, BTY, SPR (IPS-2), SPR-BRP Auto (SBGR), HLR, IP, M5B, DDC (IPS-
2), HB and JJG.
(c) Replacement of Secondary Cells :
Total 2794 Nos. of Secondary Cells replaced on age-cum-condition basis
during this year, including 32 Set of IPS Battery Bank at BDZ, MPUR,
KWDP, GBG, KNR (IPS-1&2), CQR, BTY, BBR, DDJ/RRI, BARN-CCL/E
Auto (BLYG), HLR, KPA, TGH/N, BLN/RRI, BMG, DTK, BT/N, AQR/W,
DHU, MGM, BTY, CDH, NMKA, IP, SPR-BRP Auto (SBGR), JJG, M5B,
DDC (IPS-2), HB, CDP and L.C. Gate No. 81/S/E/BTY.
6) Provision of Block Proving Axle Counter (BPAC) :
Total 11 Set of Single Section Digital Axle Counter newly provided as Block
Proving Axle Counter (BPAC) during this year in IP-SNR (Up Sub) (working as
Dual BPAC), DHU-KNJ (Dn), DHU-MGM (both Up & Dn), MGM-BTY (both Up
& Dn), BTY-DEB (Up/Dn), AQR-NAI (Dn), NAI-AQR (Up), BQG-JJG (Dn) and
JJG-MBB (Up/Dn) sections.
7) Provision of Multi Section Digital Axle Counter (MSDAC) :
Total 5 Set of Multi Section Digital Axle Counter (MSDAC) provided during
this year in BBT-MMG (both Up & Dn) & MMG-BT (both Up & Dn) Automatic
sections and as Dual Detection at KLNP (used in parallel to DC Track Circuit
Page no. 186
No. 4T over Bridge No. 2A with a view to nullifying signal failure in the event
of DC Track Circuit failure due to clit insulation damage).
8) Provision of Universal Fail Safe Block Interface (UFSBI) :
Total 8 Set of Universal Fail Safe Block Interface (UFSBI) provided – Double
Line UFSBI in MJT-BRJ, BRJ-AQR, KNJ-DHU, DHU-MGM, MGM-BTY &
JJG-BQG sections and Single Line UFSBI in BTY-DEB & JJG-MBB sections –
during this year, replacing the old block instruments.
9) Provision of Data logger :
Total 5 Nos. of Data logger newly provided during this year at BBT-MMG
Auto section [at BBT & MMG (1 No. each)], MMG-BT Auto section (at BT S/C),
BTY and JJG.
10) Replacement of Old & Worn-Out Point Machines :
Total 98 Nos. old and worn-out Point Machines replaced with IRS-type
new point machines during this year.
11) Replacement of Low-Insulation & Defective Cable :
Total 11.310 Km low-insulation as well as defective Signalling Cable
replaced during this year to reduce signal failures due to cable fault.
12) Replacement of Electrical Key Transmitter (EKT) :
Total 34 Nos. old and worn-out Electrical Key Transmitter (EKT) replaced
during this year.
13) Exothermic Welding/ Pin Brazing for Track Circuits :
Total 629 Nos. Exothermic Welding/ Pin Brazing of Track Jumpers done
during this year.
14) Provision of PPTC Fuse :
PPTC Fuse provided at total 11 Nos. of Stations – RHA-X, KLNP, FLU, STB,
SXC, MMG, DH, CHT, BBT, BRJ and IP – during this year.
15) Overhauling of Lever Frames :
Overhauling of Lever Frames done at HRO, CQR, BSHT, HNB &
SDAH Goods (GF) during this year.
16) Replacement of Block Instruments due to Overhauling, Failure & Codal
life expiry :
Page no. 187
Total 14 Nos. Block Instruments replaced due to Overhauling, Failure &
Codal life expiry – 4 Nos. Double Line Block Instruments (DLBI) and 10 Nos.
Neal’s Token Block Instruments (TBI) – during this year.
17) 4 Nos. AFTC and 7 Nos. 83.33 Hz AC Track Circuit converted to DC Track
Circuit with all accessories during this year.
18) Signalling work done in connection with the commissioning of 12-coach PF
at KYI (PF-4 in KYI-KLYM section) during this year.
19) Signal Circuit modified for total 112 Nos. of Signals during this year to
avoid signal bobbing during aspect change.
20) Total 119 Nos. of Signal Aspects converted from conventional filament-type
to LED-type during this year to improve the visibility of Signal.
B) TELECOMMUNICATION :
1) Provision of IP Based Digital PA System :
Provided at 18 Stations: Parkcircus, Dhakuria, Jadavpur, Baghajatin,
Garia, Narendrapur, Subhasgram, Mallikpur, Shasan Road, Suriyapur,
Kalyanpur, Dakshin Durgapur, Uttar Radhanagar, Bahirpuya,
Sangrampur, Netra & Gurudasnagar.
2) Provision of RDSO type GPS Office Clock for SM Office :
Provided at 36 Stations : Kanchrapara, Kalyani Simanta, Shantipur,
Kalinarayanpur, Gede, Krishnagar, Budge Budge, Naihati, Kalyani,
Majherhat,Barrackpore , Sonarpur, Sealdah, Ballygunge, Ghutiari Sharif,
Canning, Baruipur, Magrahat, Diamond Harbour, Jaynagar Majilpur,
Lakshmikantapur, Kakdwip, Namkhana, Dum Dum Jn, Kolkata Terminal,
Barasat, Hasanabad, Basirhat, Bangaon, Ranaghat, Palassey, eharampore
Court, Murshidabad, Lalgola, B.B.D.Bag & Habra.
3) Provision of RDSO type GPS Clock :
RDSO type GPS Office Clock Installed at 02 Stations – Sonarpur, Majerhat.
4) Provision of Quad Cable Replacement over Sealdah Division :
In Between Taldi & Canning 6 Quad – 760 Mtr.
In Between Akra East & Nangi West 6 Quad – 3 Km.
In Between Mayurhat & Taraknagar 4 Quad -- 4 Mtr.
In Between Nangi OFC & Nangi West Cabin 6 Quad -- 700
Mtr.
In Between Nangi OFC & Nangi PA 6 Quad -- 200 Mtr.
In Between Aranghata OFC & New Booking Counter 6 Quad -- 65 Mtr.
5) Provision of Quad Cable Joint Replacement :
Page no. 188
In Between Dum Dum Cantt & Biman Bandar (6 Quad) -- 2 Nos.
In Between Bongaon & Petrapol (4 Quad) -- 2 Nos.
In Between Taldi & Canning (6 Quad) -- 2 Nos.
In Between Mayurhat & Taraknagar (4 Quad) -- 2 Nos.
In Between Akra & Nangi (6 Quad) -- 2 Nos.
In Between Garifa & Naihati (4 Quad) -- 2 Nos.
In Between Barasat & Bamangachi (4 Quad) -- 2 Nos.
6) Provision of Maintenance Free Earthing :
Provided at 09 Stations : Sonarpur, Kalikapur, Champahati, Piali,
Gaurdaha, Ghutiari Sharif, Betberia Ghola, Taldi & Canning.
7) Provision of New Dedicated MUX installed for BPAC :
Provided at 05 Stations : Thakurnagar, Chandpara, Aranghata, Bagula &
Bamangachi.
8) Provision of 2 MBPS Connectivity for Remote Station Camera :
Provided in Between Sealdah to DumDum Jn, Sealdah to Kolkata, Sealdah
to Ballygunge, Ballygunge to Sonarpur.
9) Provision of New Auto Phone Connectivity :
02 Telephone Provided :- Baruipur (GRP), Baruipur (RPF).
10) Provision of New OFC Channel Provided for DATA LOGGER :
In Between Sealdah – Berhampur Court, Sealdah – Aranghata, Sealdah –
Canning, Sealdah – Mile 5B Cabin.
11) Provision of New OFC Channel Provided for BPAC & UFSBI :
In Between Krishnapur – Bhagwangola, Bhagwangola – Jiaganj,
Gobardanga – Thakurnagar, Malatipur – Harua Road.
12) Provision of UTS / PRS Counter Shifting at New Location :
01 Station of Sealdah Division :- Thakurnagar.
13) Provision of Battery replacement for Exchange:
01 Station of Sealdah Division :- Berhampur Court.
14) Provision of 2 Mbps Connectivity for Retiring Room Reservation System
Provided in Between Sealdah - Murshidabad.
15) Provision of 2 Mbps Connectivity for Train Running Information System
Provided in Between Sealdah – Kankurghachhi RD, Sealdah – Dum Dum n.
16) Provision of B & C Type Surge Protector :
Provided at 07 stations : Krishnanagar, Kalinarayanpur, Bidhannagar
Road, Brace Bridge, Akra, Nischindapur & Kakdwip.
Page no. 189
17) Provision of New Gate Phone :
Provided at Gate No. 20/E, 25/E with Harua Road.
Provided at Gate No. 27/E with Malatipur.
Provided at Gate No. 33/E with Champapukur.
Provided at Gate No. 44/E with Madhyampur.
18) Provision of 2 Mbps Connectivity for Workshop Management of FOIS
Circuit: Provided in between Sealdah FOIS & LLH Workshop.
COMPARATIVE YEAR-WISE POSITION OF VITAL SIGNALLING GEARS
PIStn.
EIStn.
RRIStn.
Lever FrameStn.
SM SlideStn.
66
18
6 5 12
66
22
6 5 8
Comparative Position of PI, EI, RRI, Lever Frame & SM Slide Stn.
Year 2013-14(Apr - Mar)
Year 2014-15(Apr - Dec)
Year 2013-14(Apr - Mar)
Year 2014-15(Apr - Dec)
IPS Data logger BPAC
124 112 141
125 117 152
Comparative Position of IPS, Data logger & BPAC
Year 2013-14(Apr - Mar)
Year 2014-15(Apr - Dec)
Page no. 190
Interlocked L.C. Gate
309
316
Comparative Position of Interlocked L.C. Gate Year 2013-14 (Apr - Mar) Year 2014-15 (Apr - Dec)
Electrically-operated Lifting Barrier
67
76
Comparative Position of Electrically-operated Lifting Barrier
Year 2013-14 (Apr - Mar) Year 2014-15 (Apr - Dec)
Page no. 191
Station-wise comparative signal failures in SDAH-GEDE section for 2013-14 & 2014-15.
ST
AT
ION
APR MAY JUN JUL AUG SEP OCT NOV DEC TOTAL
13-14
14-15
13-14
14-15
13-14
14-15
13-14
14-15
13-14
14-15
13-14
14-15
13-14
14-15
13-14
14-15
13-14
14-15
13-
14
14-
15
SDAH/MN
0 4 6 1 0 6 3 8 4 5 2 7 4 9 1 2 3 2 23 44
KGK 4 4 2 2 3 1 2 3 3 3 15
5 3 5 3 5 7 3 42 31
KGK-DDJ-AUTO
0 3 4 0 0 1 0 2 2 2 0 3 0 0 4 1 2 1 12 13
DDJ/ RRI
5 14
4 8 4 13
5 17
5 9 0 17
11
6 1 8 1 7 36 99
DDJ-BLH-AUTO
2 3 1 5 1 9 6 6 1 3 0 3 5 0 0 7 5 1 21 37
BLH 3 1 6 8 1 0 6 4 4 3 9 3 9 4 11
0 10
0 59 23
BLH-SEP
AUTO
5 0 2 5 10
18
5 8 3 8 2 5 0 2 0 7 15
9 42 62
SEP 8 3 8 7 8 5 6 7 3 4 3 6 2 2 9 4 14
1 61 39
KDH 8 12
14
8 11
5 8 7 10
4 5 1 4 1 7 5 11
3 78 46
TGH 19
15
12
11
13
16
18
11
28
26
5 6 9 8 23
10
12
15
139
118
BP 9 13
9 13
7 9 7 9 12
8 4 5 3 6 9 11
5 12
65 86
IP 14
12
15
4 7 9 6 8 8 9 12
6 6 5 13
10
11
8 92 71
SNR 6 27
4 8 9 6 4 4 9 16
15
11
10
10
11
8 9 3 77 93
KNR 3 7 2 8 6 7 4 10
7 7 3 8 6 4 3 7 4 6 38 64
NH 5 1 4 15
7 8 7 10
7 8 6 8 5 4 7 7 4 5 52 66
HLR 10
5 10
3 6 3 13
6 9 4 7 2 2 5 4 5 1 4 62 37
KPA 4 2 4 6 4 3 3 3 3 5 8 3 4 2 7 5 3 11
40 40
KYI 10
22
11
5 7 8 8 7 10
6 14
4 6 4 8 14
7 6 81 76
MPUR 10
6 10
5 3 0 4 2 4 0 4 3 3 7 3 3 0 4 41 30
SMX 4 3 5 6 2 8 3 3 3 3 1 6 2 8 7 5 1 3 28 45
CDH 11
6 3 5 3 3 7 2 13
6 8 8 3 3 20
9 9 4 77 46
PDX 17
2 7 1 3 2 1 0 5 2 2 5 5 1 1 3 3 3 44 19
RHA 9 5 4 6 10
7 8 17
10
7 4 6 13
5 9 9 7 9 74 71
AG 4 1 2 2 0 5 0 1 1 0 3 1 2 1 0 0 0 2 12 13
BGL 6 2 3 3 0 3 3 2 3 2 9 1 2 1 3 3 2 3 31 20
MIJ 0 0 1 2 0 2 1 2 0 0 1 0 1 0 0 1 0 0 4 7
BPN 4 0 1 0 1 1 0 1 2 0 0 1 5 1 0 1 1 2 14 7
GEDE 2 2 0 2 0 0 4 1 6 3 4 1 0 0 5 1 0 2 21 12
TOTAL
182
175
154
149
126
158
142
161
175
153
146
135
125
104
169
151
147
129
1366
1315
Page no. 192
II) Assistance required:
1) Replacement work of Panel Interlocking (PI) systems at ASKR & BBDB is
required, as the codal life of 25 years has already expired in each case.
The work was already proposed in PWP 14-15, but not sanctioned. The
work has again been proposed in PWP 15-16.
2) Proposal for creation of 4 (four) posts of SIM/III for new P.I. stations i.e.
Malatipur, Lebutala & Madhyampur in BT-HNB section and for BRP-DH double
line section along with matching surrender of 5 (five) posts of Helper (non-
incumbent posts), was sent to CPO/ER/KKK on 18.04.2012 for sanction of the
Competent Authority.
3) DDJ/RRI was designed on PI-150 relays, which are obsolete now and spares are
rarely available. Hence, its replacement by new RRI is required.
SECTIONAL DISTRIBUTION OF S&T OFFICERS
Officer Jurisdiction
Sr. DSTE/SDAH Overall In-charge of the S&T Department.
DSTE/I/SDAH SEP – PDX & SDAH (S) – BLN.
DSTE/W/I/SDAH Ex-BLN – BGB and all the Divisional Telecom.
Gears.
ASTE/I/SDAH Ex-BLN – DH, SPR – CG & BRP – NMKA.
ASTE/II/SDAH SDAH – AGP, DDJ – BLYH, DDJ – PPGT, DDJ – GMA & BT – HNB.
ASTE/RHA ASKR – BNJ, BNJ – RHA, RHA – KNJ – LGL, RHA – GEDE & KLNP – STB – KNJ.
Page no. 193
Salient features of S&T in SDAH-GEDE section
The SDAH-GEDE section is MACL Signalling territory with RE. The system of
Block working in SDAH-KGK, KGK-DDJ, DDJ-BLH & BLH-SEP sections is
Automatic Block System and in SEP-RHA-GEDE section is Absolute Block System.
The salient S&T features of this section are furnished below :-
SIGNAL
1. No. of Block Station : 25
2. No. of Panel Interlocked Station (PI) : 20 [(Central Panel); Panel also exists at RHA X/C]
3. No. of Route Relay Interlocked Station : 5 (SDAH/MN, KGK, DDJ, NH (RRI) & RHA)
4. No. of Interlocked L.C. Gate : 75
(a) No. of Mechanical Gate : 47
(b) No. of Electrically-operated : 28 Lifting Barrier Gate
5. No. of Slide Boom- type Gate : 15
6. No. of Integrated Power Supply System : 32
(IPS)
7. No. of UPS/ IPS-feeding provided : 11 at L.C. Gate 8. No. of Data logger : 28
9. No. of Block Proving Axle Counter(BPAC) : 56
(a) No. of Dual BPAC : 12
10. No. of Double Line Block Instrument : 54
(DLBI)
11. No. of Universal Fail Safe Block : 1 Interface (UFSBI) (Double Line) 12. No. of Tokenless Block Instrument : 2
(TLBI)
Page no. 194
TELECOMMUNICATION
COMMUNICATION:
(a) Control OFC & Quad – 116.45 Route
Km.
(b) FOIS CCT SDAH, DDJ, SEP, TGH, NH,
RHA.
(c) Exchanges SDAH,BP, NH, KPA, RHA
(d) 2 Mbps Connectivity Between Exchange SDAH,BP, NH, KPA, RHA
(e) Emergency Communication SDAH to GEDE – Simplex
VHF.
PASSENGER AMENITIES:
(a) Integrated Train Indication Board 04 Stations. (BLH,SEP,
KDH,RHA)
(b) PC Based Train Indication Board 16 Stations. (SDAH, NH, BP,
CDH, DDJ, HLR, IP, JGDL, KYI,
KPA, KNR, MPJ, PTF, SNR,
SMX,
TGH)
(c) PA System :
(i) PC Based Announcement System 17 Stations. (SDAH, NH, BP,
CDH, DDJ, HLR, IP, JGDL, KYI,
KPA, KNR, MPJ, PTF, RHA,
SNR,
SMX, TGH)
(ii) Microprocessor Based Announcement System 06 Stations. (BPN, BLH,
DDJ, KDH, PXR, SEP)
(iii) Integrated Announcement System 01 Station. (SDAH)
(iv) Conventional Announcement System 29 Stations.(SDAH,
BNXR,
NH, AGP, AG, BGL, BPN,
BP, BLH, CDH, DDJ,
GEDE,
HLR, IP, JGDL, KYI, KPA,
KNR, KDH, MPJ, MIJ,
PXR,
PTF, PDX, RHA, SNR,
SMX,
SEP, TGH)
(d) CLOCK :
(i) GPS Based Digital PF Clock 28 Stations.
(ii) GPS Based Digital Office Clock 08 Stations.
Page no. 195
SALIENT FEATURES OF SIGNAL OF THE DIVISION
1. No. of Block Station : 107
2. No. of Panel Interlocked Station (PI) : 66
(a) Central Panel Station : 61
(b) End Panel Station : 5 (AQR, NAI, BRP, BT & TGH)
3. No. of Route Relay Interlocked Station : 6 (SDAH/MN, KGK, DDJ, NH, (RRI) RHA & BLN)
4. No. of Electronic Interlocked Station (EI) : 22 (KOAA, BNJ, SDAH/South, BGB, GOF, TLX, CG, MGT, D, BSD, DH, KLNP, FLU, STB, KNJ, DHU, MGM, BTY, JJG, BQG, KRP & LGL) 5. No. of Lever Frame Station : 5 (CP N/C, HRO, CQR, BSHT & HNB)
6. No. of SM Slide Station : 8 (DEB, PLY, REJ, BEB, SGV, BPC, CSZ & MBB)
7. No. of Interlocked L.C. Gate : 316
(a) No. of Mechanical Gate : 240
(b) No. of Electrically-operated : 76 Lifting Barrier Gate
8. No. of Slide Boom- type Gate : 31
9. No. of Integrated Power Supply System : 125
(IPS)
10. No. of UPS/ IPS-feeding provided : 44 at L.C. Gate 11. No. of Data logger : 117
12. No. of Block Proving Axle Counter(BPAC) : 152
(a) No. of Dual BPAC : 15
13. No. of Double Line Block Instrument : 90
(DLBI)
14. No. of Universal Fail Safe Block : 22 Interface (UFSBI) (Double Line) 15. No. of Universal Fail Safe Block : 5
Page no. 196
Interface (UFSBI) (Single Line) 16. No. of Tokenless Block Instrument : 42
(TLBI)
17. No. of Token Block Instrument (TBI) : 12
SALIENT FEATURES OF TELECOM. OF THE DIVISION
1. COMMUNICATION :
(a) Control OFC & Quad – 686 RKm
18 18 GHz MW – 29.01 RKm
(b) FOIS CCT Rly. CCT. - OFC – 22 locations
BSNL CCT. – 1 location
(c) Exchanges SDAH, BRSH, KPA, SPR, BRP,
KOAA, BP, NH, RHA, KNJ, BT,
BPC & BGB –13 Nos.
(d) 2 MBPS Connectivity Between Exchange All the Exchanges ( BGB, BRP are
64 Kbps)
(e) Emergency Communication Emergency Socket KNJ – LGL
(127.67 RKm)
Simplex – Entire Division
(except KNJ – LGL section)
(f) Voice Datalogger SDAH CNL Test Room
2. PASSENGER AMENITIES :
(a) (i) PC based Train Indication Board 42 Stations
(ii) Integrated Train Indication Board 10 Stations
(b) True Colour Video Display for 02 Stations ( KOAA, SDAH )
Train Information System
(c) PA SYSTEM :
(i) PC/Microprocessor based/Integrated 86 Stations
Announcement System
(ii) Conventional 149 Stations
Page no. 197
(d) LED based Coach Indication Board 43 Nos. at SDAH
(e) True Colour Coach Indication Board 120 Nos. at KOAA
(f) LED based At-a-Glance Display Board 03 Nos. at SDAH
(g) True Colour At-a-Glance Display Board 16 Nos. at KOAA and 1 No. at
SDAH
(h) CLOCK:
(i) GPS-based Digital PF Clock 296 Nos. at 127 Stations
(ii) Tower Clock 02 Stations (SDAH & DDJ)
ORGANISATIONAL STRUCTURE OF THE DIVISIONAL S&T
Sri N. Mukherjee,
Sr. DSTE/SDAH
Sri S. Mondal,
DSTE/I/SDAH
Sri S.P. Yadav,
DSTE/W/I/SDAH
Sri K. Prasad,
ASTE/RHA
Sri P.K. Chatterjee,
ASTE/I/SDAH
Ms S. Biswas,
ASTE/II/SDAH
Page no. 198
STORES
I) PERFORMANCE:
Corporate Action Plan
AVAILABILITY OF SAFETY & PASSENGER AMENITIES ITEMS
100%
MONITORING & SUPPLY OF ITEMS RELATED TO IMAGE MAKERS WITH PROPER QUALITY
100%
USE OF TECHNOLOGY TO ENHANCE
TRANSPARENCY AND EFFICIENCY
IMPLEMENTED
TARGETS
Sl. No Subject 2014 – 15
Target Actuals
1. Asset Reliability: Ensuring
availability of materials (in %)
95 100
2. Safety Items : Ensuring
availability of safety items
(in %)
100 100
3. Floating of Tender (within 60
days after receipt of demand)
(in %)
90 100
4. Reduction in manpower (%) 1 1
Page no. 199
TARGETS FOR INFRASTRUCTURAL IMPROVEMENTS, TECHNOLOGY
UPGRADATION & STRATEGY.
SLNO OBJECT TARGET ACTUAL
1 e-Procurement — Extension of
e-procurement in division.
100 % 100 %
Local Purchase through IMMIS and IREPS:
Local Purchase through IMMIS and IREPS has been successfully started in SDAH Division during 2014-15 by using technology to enhance transparency and increase efficiency.
STRATEGIES
Special emphasis is being laid on Safety in Train Operation by ensuring availability of Safety Items, for which Rly. Board have circulated a comprehensive bid. 100% availability of safety item is being monitored regularly.
Regular training of staff and officers to upgrade their skills and efficiency in IREPS, IMMIS.
To keep the procurement within the Budgetary Limit by reviewing requirement in consultation with the end-users and finance.
ARRISING OF SCRAP OF SEALDAH DIVISION UPTO DEC-2014
DEPTT NATURE OF SCRAP
UNIT PROPORTIONATE TARGET FOR
2014-15
CUMMULATIVE UPTO
31/12/14
PERCENTAGE OF
VARIATION ENGG. Rail MT 1148 1791.441 +56%
C. I MT 185 394.644 +113%
M. S MT 725 826.061 +14%
Bridge MT - 263.770 -
Page no. 200
MECH. (C&W)
Wagon FWU 18 24.000 +33%
Wheel SET 154 220.000 +43%
Ferrous MT 825 622.159 -25%
Non-Ferrous MT 0.75 0.985 +31%
Trolley NO 12 16.000 +33%
M&P NO 7.5 10.000 +33%
MECH. (D&P)
Ferrous MT 1.5 8.270 +450%
Non-Ferrous MT 0.75 0.815 +8%
TRS
Ferrous MT 150 159.512 +6%
Non-Ferrous MT 4 4.866 +29
TRD
Ferrous MT 86.25 98.940 +5%
Non-Ferrous MT 3.75 20.770 +453%
ELEC(G)
Ferrous MT 75 128.810 +72%
Non-Ferrous MT 37.5 40.787 +9%
S & T Ferrous MT 22.5 20.428 -9%
Non-Ferrous MT 18.75 25.760 +37%
Position of SUMMER UNIFORM from NH to GEDE AS ON 01/01/2015
S.L.
NO.
Station Description of
the item
Demand
Quantity
Issue Remarks
01. NH Shirt T/Cot
white &
Trouser T/Cot
Black
36 Full Qty Issued on
03/07/14
--
02. NH Parcel -do- 08 -do- ---
03. NH Goods -do- 12 -do- ----
04. NH
Enquiry
-do- 04 -do- ----
05. HLR -do- 12 Full Qty Issued on
20/05/14
----
06. KPA -do- Nil ---- ---
Page no. 201
07. KYI
(Goods)
-do- 06 Stock available but
not yet been drawn
----
08. MPJ -do- Nil ----- ------
09. SMX -do- 02 Stock available but
not yet been drawn
------
10. PXR -do- 08 -do- ----
11. CDH -do- Nil ----- -----
12. PDX -do- 10 Stock available but
not yet been drawn
-----
13. RHA -do- Nil ------ ------
14. AG -do- 10 Full Qty Issued on
13/10/14
------
15. BGL -do- 12 Stock available but
not yet been drawn
-------
16. MIJ -do- 10 -do- ------
17. BPN -do- 08 -do- ------
18. GEDE -do- 08 -do- -------
19. NH Shirt T/Cot
Pastel Powder
Trouser T/Cot
Oxford Blue
04 Full Qty Issued on
03/07/14
------
20. KPA -do- Nil ------ ------
21. KYI -do- -do- ------ ------
22. CDH -do- -do- ------- -------
23. RHA -do- -do- ------- --------
24. BGL -do- 02 Stock available but
not yet been drawn
------
25. NH-GEDE Saree Mustered
colour with
beige border
with small
prints in the
body, border &
Pallu with
blouse piece
Out of stock
26. SSE/PW/
NH,KPA,
RHA
No demand for
2014-15
---- ------ -----
Page no. 202
Position of WINTER UNIFORM from NH to GEDE as on 01/01/2015
Jersey
Maroon
Jersey
Blue
Cardiga
n
Coat
D/Grey
Trouser
D/Grey
Coat
white
Trouser
White
AEN/RH
A
Full Qty
Issued
on
13.11.13
No
Demand
Full Qty
Issued
on
13.11.13
No
Demand
No
Demand
Full Qty
Issued
on
13.11.13
Full Qty
Issued
on
13.11.13
PWI/KP
A
Full Qty
Issued
on
16.12.13
Full Qty
Issued
on
16.12.13
Full Qty
Issued
on
16.12.13
Full Qty
Issued
on
16.12.13
Full Qty
Issued
on
16.12.13
No
Demand
No
Demand
IOW/NH Full Qty
Issued
on
19.11.13
Out of
Stock
Full Qty
Issued
on
19.11.13
Full Qty
Issued
on
19.11.13
Full Qty
Issued
on
19.11.13
No
Demand
No
Demand
IOW/RH
A
Out of
Stock
Out of
Stock
Out of
Stock
No
Demand
No
Demand
No
Demand
No
Demand
PWI/RH
A
Full Qty
Issued
on
02.12.13
Out of
Stock
Full Qty
Issued
on
02.12.13
No
Demand
No
Demand
No
Demand
No
Demand
AEN/II/
KPA
Out of
Stock
No
Demand
Full Qty
Issued
on
08.01.14
No
Demand
No
Demand
No
Demand
No
Demand
IOW/Lin
e/KPA
Out of
Stock
Out of
Stock
Out of
Stock
Not
Drawn
Not
Drawn
No
Demand
No
Demand
PWI/NH Out of
Stock
Out of
Stock
Out of
Stock
No
Demand
No
Demand
No
Demand
No
Demand
Position of Winter Uniform from NAIHATI TO GEDE as on 01/01/2015
Period Winter13-14 Winter14-15
STATION Coat Serge Superior &
Trouser Serge Superior
Coat Serge Superior, Trouser Serge
Superior & 4W Coat (Ladies)
Page no. 203
NH Full Qty Issued on 03/07/14 Not Drawn (L)
HLR No Demand Not Drawn by unit
HLR(Goods) -do- Not Drawn by unit
KPA Full Qty Issued on 15/10/14 Not Drawn (L) by unit
KYI
(Checking)
Not Drawn by unit Not Drawn (L) by unit
KYI (Goods) Not Drawn by unit No Demand
MTJ No Demand No Demand
SMX Full Qty Issued on 16/12/13 No Demand
PXR No Demand No Demand
CDH Not Drawn by unit Not Drawn by unit
PDX No Demand No Demand
RHA Full Qty Issued on 17/12/14 Not Drawn by unit
BNKA No Demand No Demand
PNCB No Demand No Demand
AG No Demand Not drawn by unit
BHGH No Demand No Demand
BHNA No Demand No Demand
BGL Not Drawn by unit Not Drawn
MYHT No Demand No Demand
TNX No Demand No Demand
MIJ Full Qty Issued on 12/11/13 Not Drawn by unit
BPN No Demand Not Drawn by unit
MRSR No Demand No Demand
GEDE No Demand Not Drawn by unit
Page no. 204
AVAILABILITY OF SAFETY FORM ITEMS FOR THE YEAR
2014-15 IN DRM STORES/SDAH
1 2
3 4 5
6
Caution Order T/409
Shunting Order T/806
Starting Order T/511
Train Signal Register OP/T-28
To pass Signal in “ON” or Defective Position T/369 (3b)
Train intact approval Register T/1410
Present Stock 80 Books
Present Stock 100 Books
Present Stock 20 Books
Present Stock 100 Books
Present Stock 40 Books
Present Stock 200 Books
7 8 9
Private number book
Reminder Caution Order T/B-409
Signal Failure Memo Book
Present Stock 3000 NOS
Present Stock 100 Books
Present Stock 500 Books
AVAILABILITY OF CONSUMABLES
FOR THE YEAR 2014-15 IN DRM STORES/SDAH
Fog Signal Hand Signal Flag Red
Hand Signal Flag Green
Dry Cell Bed Sheet white cotton
Present Stock 6220 NOS
Present Stock 420 NOS
Present Stock 371 NOS
Present Stock 1061 NOS
Present Stock 200 NOS
Page no. 205
AVAILABILITY OF SAFETY ITEMS
FOR THE YEAR 2014-15 IN DRM STORES / SDAH
B.O/H.S Lamp
Lock Pad G.I. 2-1/2 inch with D/Key
Lock Pad G.I. D/Key 1 ½ Inch
Safety chain 7 ft long
Safety chain 30 ft long
Fire Bucket
Flashing Tail Lamp (LED)
Present Stock 903 NOS
Present Stock 122 NOS
Present Stock 4 NOS
Present Stock 37 NOS
Present Stock 12 NOS
Present Stock 26 NOS
Present Stock 95 NOS
PERFORMANCE OF PURCHASE SECTION:
FOR THE YEAR 2014-2015 (FROM APR ’14 UPTO DEC ’14)
No. of Demands Received
No. of Demands for which NS certification Done
No. of
Tender case opened including e-tendering
Total No. of P.O & S.O placed
Under Process
Total
Value (in lacs)
298 254
268 284
(S.O-30 Nos)
15 262.25
Page no. 206
SECURITY
I) PERFORMANCE:
Performance under Railway Act for the year 2014 as compared with the corresponding period of 2013over Sealdah division.
2014 ( Jan to Dec) 2013 ( Jan to Dec) Percentage of
performance
Persons apprehended Fine
Realized
Persons
apprehended
Fine
Realized
Persons
apprehended
Fine
Realized
18400 3935454 15487 3388833 18.81(+) 16.13(+)
Performance under RP(UP) Act cases for the year 2014 as compared with the corresponding period of 2013 over Sealdah Division
2014 ( Jan to Dec) 2013 ( Jan to Dec) No. of case Value of property
Arrest No. of case Value of property
Arrest Registered Detected Stolen Recovered Registered Detected Stolen Recovered
23 22 121489 103262 37 34 33 296547 262717 47
Percentage of performance under RP(UP)
No.of case Value of property
recovered
Arrest
Registered Detected Stolen Recovered
32%(-) 33.33(-) 59.03(-) 60.69(-) 21.28(-)
Comparative data for theft of Railway Material (Localized) for the year 2014 as compared with the year 2013
over Sealdah division
2014 2013
Classification
of crime
No of cases Value of property Arrest
No. of cases Value of Property Arrest
Regd. Detd. Stolen Recovery Regd. Detd. Stolen Recovered
Engineering 10 10 11917 15390 17 11 11 22576 22576 18
Signal 05 05 8175 7975 06 06 06 162650 162650 09
Mechanical 01 01 4220 4220 01 02 02 20200 16700 01
Page no. 207
EMU 02 02 7052 7052 01 05 05 8981 8981 05
Electrical (G) 02 02 15000 11180 03 04 03 49930 19600 04
OHE 0 0 0 0 0 01 01 3540 3540 01
Misc 01 0 18000 0 0 0 0 0 0 0
Total 21 20 64364 45817 28 29 28 267877 234047 38
Percentage of performance of Railway materials ( Localised)
No.of case Value of property recovered
Arrest
Registered Detected Stolen Recovered 27.59(-) 28.57(-) 75.97(-) 80.42(-) 26.32(-)
Passenger crime reported/registered over Sealdah Division during the period from January to December 2014 compared with corresponding period of 2013 In trains
2014 2013
Classification
of crime
No of cases Value of property Arrest
No. of cases Value of Property Arrest
Regd. Detd. Stolen Recovery Regd. Detd. Stolen Recovered
Dacoity Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil
Robbery Nil Nil Nil Nil Nil 02 02 6300 930 02
Drugging 02 0 3300 0 0 06 02 65950 * 06
Molestation
(CAWOR)
18 17 0 0 27 14 12 0 0 14
Rape Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil
Theft of
Passenger
Belongings
183 102 1042921 2570 143 189 84 904350/- 1310/- 189
In Premises
2014 2013
Classification No of cases Value of property Arrest No. of cases Value of Property Arrest
Page no. 208
of crime Regd. Detd. Stolen Recovery Regd. Detd. Stolen Recovered
Dacoity Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil
Robbery Nil Nil Nil Nil Nil 01 01 1900 * 02
Drugging Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil
Molestation
(CAWOR)
27 26 0 0 32 29 26 0 0 26
Rape 05 03 0 0 06 02 0 0 0 0
Theft of
Passenger
Belongings
156 105 1212680 54375 149 168 103 1624717 9580 140
Details of Train Escorted by RPF and GRPS of Sealdah Division
Sl No. and name of
the trains
Escorted by Post/Coy
Frequency
From Departure
To Arrival
Present
Strength
1 13185 Up GangaSag
ar Exp.
RPF/Post/SDAH Daily Sealdah 15.40 Asansol 20.30 1+5
2 13186 Dn Ganga
SagarExp
RPF/Post/SDAH Daily Asansol 01.48 Sealdah 06.55 1+5
3 53181 Up Lalgola
Passenger
RPF/Post/SDAH Daily Sealdah 23.05 Lalgola 0505 1+4
4 53172 DnLalgola Passenger
RPF/Post/SDAH Daily Lalgola 21.30 Sealdah 04.30 1+4
5 13133 Up Varanasi
Exp
RPF/Post/CS-CA Daily Sealdah 21.15 Rampurhat
00.34 1+4
6 12987 Ajmer
SarifExp
RPF/PF Post SDAH
Daily Sealdah 23.20 Dhanbad
02.50 1+5
7 13147 Up Uttarbang
aExp
RPF/TE Coy Daily Sealdah 19.35 Malda 02.25 1+4
8 13148 DnUttarba
ngaExp
RPF/TE Coy Daily Malda 22.40 Sealdah 05.10 1+4
9 13149 Up KanchankanyaExp
RPF/TE Coy Daily Sealdah 20.30 Malda 03.10 1+4
10 13150 DnKancha
RPF/TE Coy Daily Malda 01.15 Sealdah 08.15 1+4
Page no. 209
nkanyaExp
11 12259 Duranto Express
RPF/Post/CS-CA Sun, Mon,
Wed,Thu
Sealdah 18.40 Dhanbad
22.00 1+4
12 13109 Up/3108 DnMaitree
Exp
RPF/Post/CS-CA Tues, Sat& Sun
Kolkata (T)
07.10 Gede 09.05 1+10
13 13155 Up Mithilanch
alExp
RPF/Post/KOAA Sun, Thu
Kolkata (T)
20.55 Asansol 01.00 1+4
14 13156 DnMithilanchalExp
RPF/Post/KOAA Tues, Sat
Asansol 2250 Kolkata(T)
03.45 1+4
15 13157 Up TirhutExp
RPF/Post/KOAA Tues Kolkata(T)
20.55 Asansol 01.00 1+4
16 13158 DnTirhutE
xp
RPF/Post/KOAA Thurs Aasansol
2250 03.45 1+4
17 12383 Up (ASN-
Intercity Express)
RPF/PF Post & SDAH
Except Sunday
SDAH 17.00 Asansol 20.55 1+4
18 12360 DnGaribra
thExp
RPF/Post/ SDAH & CS-CA/Post
Mon, Thurs,
Sat
Asansol 02.07 Kolkata(T)
05.15 1+4
19 12377 Up Padatik
Exp.
RPF/PF/SDAH Daily Sealdah 22.55 Rampurhat
02.25 1+4
20 12378 DnPadatik
Exp
RPF/PF/SDAH+RPF/Post/CS-CA (Escort party of Up Varanasi)
Daily Rampurhat
03.15 Sealdah 06.45 1+4
21 13131 Up (Kolkata-
Anandbihar Exp.)
RPF/Post/CP Daily Kolkata(T)
19.50 Asansol 23.47 1+4
22 13132 Dn(Anand
bihar-Kolkata
Exp)
RPF/Post/CP Daily Asansol 02.37 Kolkata(T)
07.30 1+4
23 13159 Up Kolkata-Jogbani Express
RPF/Post/KOAA Mon, Wed, Fri
KOAA 20.55 RPH 02.05 1+4
24 13160 Dn Kolkata- Jogbani Express
RPF/Post/KOAA Wed, Fri, Sun
RPH 22.50 KOAA 03.45 1+4
25 12314 Rajdhani
RPF/Commando LLH + RPF of
Daily DHN 06.30 SDAH 10.15 1+4
Page no. 210
Express SDAH Divn
26 13145 Up (Radhikap
ur Express)
RPF/Post/KOAA Daily KOAA 19.30 Katwa 22.57 1+4
27 13146 Dn (Radhikap
ur Express)
RPF/Post/KOAA Daily Katwa 01.48 Kolkata 05.35 1+4
28 15048/15050/1505
2 Dn (Poorvanchal Express)
RPF/PF/SDAH, RPF/Post/SDAH
Tue, Thu, Fri
ASN 00.27 Kolkata 04.25 1+4
29 13135 Up (KOAA-
Joynagar Express
RPF/NKG-II Coy Sat KOAA 20.55 ASN 00.52 1+4
30 12496 Up Pratap
Express)
RPF/Post/BP FRI KOAA 22.45 ASN 01.31 1+4
31 13138 Dn (Azamgarh-Kolkata Express)
RPF/Post/SDAH Tue ASN 22.50 KOAA 03.45 1+4
Escorting details of RPF
1) Total no. of Mail/Express trakns escorted: 29. 2) Total no. of Passenger trains escorted: 02 3) EMU train:- 68 – (a) Ladies special: 08 (b)- Ladies coaches of EMU/MEMU-
60
Unauthorized encroachment dismantled for the year 2014 as compared with 2013 over Sealdah Division.
Section 2014 2013
Sealdah-Barrackpore 94 53 Barrackpore-Naihati 51 04
Naihati-Ranaghat 122 113 Ranaghat-Berhampore 36 05
Ranaghat-Gede 17 08 Ranaghat- Bangaon 3 18 DumDum-Barasat 72 40 Barasat-Bangaon 32 0 Barasat-Bangaon 32 0
Sealdah-Diamond Harbour 224 19 Ballygunge-Lakhikantopur 264 115 Ballygunge-Budgebudge 77 14
Total 992 389
Page no. 211
II) ASSISTANCE REQUIRED: Accommodation for train escorting party and for Posts and Out posts : The train escorting party of Sealdah division after escorting the train ex Sealdah to Maldah/Asansol/Dhanbad faces problems in getting accommodation for rest/refreshment due to non- availability of sufficient infrastructure. Resulting which escorting party overworked in escorting without getting proper rest.
Requirements of Modern Security Gadgets and Boundary wall for Acess Control: Sealdah being an important hub of brisk business activity and a prime centre of commercial transactions of Eastern India having National and International ramifications. It is one of the busiest Railway Stations of India with huge numbers of passenger’s traffic movement and commercial activity but the station is having acute scarcity of modern security gadgets like CCTV, CCTV Control Rooms, DFMD, HHMD, Walkie-Talkie, Baggage Scanner, Vehicle Scanner, Bullet Proof Morcha etc. The station is also lacking boundary walls so proper access control is hard to materialize. As the existing CCTVs are became old and not serving the purposes.
III) Requirement of CUG SIMs: All the officers of supervisory rank as well as the train escorting Company should be provided with CUG SIM so that the better communication can be maintained and asked for back-up/help enroute from the post/Headquarter.
IV)
V)
Requirement of vehicles : All sections of Sealdah Division are having common phenomenon of obstruction of train movement due to Railway and non railway causes. To tackle the situation, RPF men are facing difficulties to attend the spot promptly for want of vehicles. No vehicle has been provided at Posts. They also faced problem to attend the place of incident in odd hours. To meet any kinds of eventually four wheeler and two wheeler is urgently required at the RPF/Posts.
Requirement of Walkie Talkie and VHF sets.: For better communication as well as to take promptitude action Walkie Talkie and VHF base station is urgently required.
Requirement of Data Card: Today if the age of Technology and to cope up with the same and o smoothen the working culture of Railway Protection Force, a module called Railway Safety Management System (RSMS) have been organized by ‘CRIS’. RSMS facilitate to send or receive mail/messages, Reports etc. from other Part of Division, Zone, or Railways through Internet but due to absence of Internet connection at Post, such RSMS module is unable to be executed. Hence, Data Cards (Internet Connections) are urgently required at all the Posts.
Innovative Ideas to strengthen the image of Force: Behavioral training are being imparted to the officers and staff deployed at Train escorting trains. During such training, officers and staff are being briefed about disaster management, Behaviour with passengers, spot assistance to the passengers, law related aspects while dealing with public, stress management etc.