THE HIGHLAND COUNCIL Agenda Item 5.8 NORTH PLANNING APPLICATIONS COMMITTEE – 16 September 2014 Report No PLN/068/14 14/02735/FUL : MeyGen Ltd Ness Of Huna And Ness Of Quoys Huna Report by Area Planning Manager SUMMARY Description : Amended design and finish for 3 Power Conversion Unit Buildings (PCUBs) previously approved (ref 12/02874/FUL) Recommendation - GRANT Ward : 04 - Landward Caithness Development category : Local development Pre-determination hearing : Not required Reason referred to Committee :Area Manager’s Discretion 1. PROPOSED DEVELOPMENT 1.1 This application seeks approval for amended design of Power Conversion Unit buildings PCUBs, previously approved under planning permission 12/02874/FUL. Planning permission 12/02874/FUL covers the overall onshore development to serve the MeyGen tidal turbines energy project and coves the construction of the Power Conversion Centre (PCC) including 3 Power Conversion Unit Buildings (PCUB) and 1 control building, the installation of temporary horizontal directional drilling (HDD), formation of a new access from the public road and drainage provision. The principle of development is established on this site. It is not proposed to amend any other details of permission 12/02874/FUL and this consent will remain live. Site development and phasing is unaltered from the original consent. The PCUBs are required to house the power conversion equipment, transformers and switchgear for connection to the grid. The amended design includes a reduction in height and width of the PCUBs previously approved, change to a simple rectangular with form pitched roofs, akin

Transcript of 14/02735/FUL : MeyGen Ltd Ness Of Huna ... - Highland Council

THE HIGHLAND COUNCIL Agenda Item 5.8

NORTH PLANNING APPLICATIONS COMMITTEE – 16 September 2014 Report No PLN/068/14

14/02735/FUL : MeyGen Ltd Ness Of Huna And Ness Of Quoys Huna Report by Area Planning Manager SUMMARY

Description : Amended design and finish for 3 Power Conversion Unit Buildings

(PCUBs) previously approved (ref 12/02874/FUL) Recommendation - GRANT Ward : 04 - Landward Caithness Development category : Local development Pre-determination hearing : Not required Reason referred to Committee :Area Manager’s Discretion

1. PROPOSED DEVELOPMENT

1.1 This application seeks approval for amended design of Power Conversion Unit buildings PCUBs, previously approved under planning permission 12/02874/FUL. Planning permission 12/02874/FUL covers the overall onshore development to serve the MeyGen tidal turbines energy project and coves the construction of the Power Conversion Centre (PCC) including 3 Power Conversion Unit Buildings (PCUB) and 1 control building, the installation of temporary horizontal directional drilling (HDD), formation of a new access from the public road and drainage provision. The principle of development is established on this site. It is not proposed to amend any other details of permission 12/02874/FUL and this consent will remain live. Site development and phasing is unaltered from the original consent. The PCUBs are required to house the power conversion equipment, transformers and switchgear for connection to the grid. The amended design includes a reduction in height and width of the PCUBs previously approved, change to a simple rectangular with form pitched roofs, akin

to agricultural sheds and changes to external finishes. The amended PCUBs as currently proposed are 31m x 18m (x 6m in height to ridge). Potential future expansion is shown indicatively. Each has a floor area of 558 square metres. Details of the design are outlined in section 8 of this report.

1.2 The original application 12/02874/FUL was processed as a major application. The current application is being processed as a local application because it is only for the amended design of the previously approved PCUBs.

1.3 An Environmental Impact Assessment was conducted in 2012 to support the previous planning application. The Environmental Statement has been updated as appropriate to reflect this application for amended design of the PCUBs.

1.4 Information has been submitted with this application which sets out the rationale for the amended design proposal. This states that the initial design was based on the buildings being the focus of a new emerging industry, and rather than try and incorporate them into the landscape it was felt that they could be used as the expression of the new industry. With the technical advances that the project has made, the height and volume of the PCUBs has been significantly reduced. It is felt that the PCUBs are better incorporated into the landscape with a more subtle design rather than drawing attention to them. A low, pitched roof form with sensitive colours can be sensitively incorporated into the landscape with the correct detailing.

1.5 The supporting statement considers that the overall reductions in height, width and volume are environmentally beneficial, enabling a more economic and low impact building form to be adopted which reflect the actual requirements of plant and equipment. The overall scale of the revised PCUBs are more comparable to the prevailing built forms and scale of existing development in the area. The space between the PCUBs has been reduced in light of the reduced width of the buildings. This allows the overall site footprint to be reduced whilst ensuring that the PCUBs remain a distinct cluster which tie with each other.

1.6 MeyGen seeks to provide visitor information on the project at the John O’ Groats tourist centre.

1.7 The supporting information also highlights the issue of cost. The emerging tidal energy industry is under considerable pressure to be commercially competitive with other form as of energy generation. MeyGen have sought to significantly reduce costs in all areas of the project. At this site it has meant looking for alternative solutions that do not have a detrimental impact on the local landscape. MeyGen have stated that they wish the project to have a sustainable positive impact on the local community which they feel will be achieved with the successful roll-out of this initial phase of the project.

1.8 Variations: None 2. SITE DESCRIPTION 2.1 The site is open and largely flat agricultural land at Ness of Quoys. It will be

accessed from the A836 which is the main north coast road. The access to the site is immediately to the east of Canisbay Church and Burial Ground which are A

listed. Quoys Farm is to the east of the site access.

3. PLANNING HISTORY

3.1 12/02874/FUL - Construction of Power Conversion Centre (PCC) including 3 Power Conversion Unit Buildings (PCUB) and 1 Control Building. Installation of temporary Horizontal Directional Drilling (HDD) at PCC site., This was considered by the North Planning Committee in March 2013 and granted 4 February 2014. The 3 PCUBs approved are 27m x 43m (x 27m in height at the highest point).

4. PUBLIC PARTICIPATION

4.1 Advertised : Unknown neighbour Representation deadline : 8 August 2014 Timeous representations : 1 objection, 2 in support Late representations : 0

4.2 Material considerations raised are summarised as follows: Support reduction in height of building but may be possible to further reduce

height above ground by partial excavation, to reduce visual impact of the cluster of buildings

Change from architect design to agricultural type shed is a retrograde step. More consideration must be given to the design of the buildings to minimise visual impact on the surroundings and landscape. A first class design is required to minimise noise, visual and landscape impact in this scenic/tourist area of Caithness. Proliferation of anonymous agricultural sheds along the seaward side of the tourist route from John O Groats to Castle of Mey is not in the local interest.

Agricultural sheds are not best placed to minimise light and noise pollution. Proposal is detrimental to wide open landscape scenery Use of mounds and landscaping to obscure visual impact and deaden sound

should be maintained

• Welcome reduction in size of the PCUBs and the simpler less demonstrative form of the buildings. The current proposal reflects buildings of traditional industries and agriculture rather than the constructional language of the industrial estate or office park. The smaller, simpler sheds proposed are much more in keeping with the surroundings, landscape and setting of the church than the previously approved structures.

• The PCUBs are not considered to be a justifiable focus of public interest, rather the interest is in the turbines which will sit on the sea bed. The invisibility of the marine infrastructure is one of the key selling points which sets it apart from other forms of renewable energy.

• There is scope to revisit the external materials, details and landscaping to ensure that the buildings are not akin to those of an industrial park, but rather provide a suitable model for the harmonious expansion of the marine energy industry in Caithness and beyond.

• No need for two entrance signs

4.3 All letters of representation are available for inspection via the Council’s eplanning portal which can be accessed through the internet www.wam.highland.gov.uk/wam. Access to computers can be made available via Planning and Development Service offices.

5. CONSULTATIONS

5.1 All consultation bodies consulted for the previous application were consulted. Comments were received from the following:

5.2 SEPA : No objections but request that a condition be attached requiring the submission of a site specific environmental management plan.

5.3 Environmental Health : No observations subject to previous noise condition being applied.

5.4 Access Officer : No comments specific to this application. The proposal is limited to the footprint of the buildings and conditions attached to the issued permission 12/02874/FUL will apply to the remainder of the wider site associated with the development.

5.5 Landscape Officer : Objection. The reduction in height and footprint of the buildings is welcomed. However the design proposed adds to the concentration of anonymous, profile sheeting sided sheds in the area. The views from the A836 and adjacent areas already contain many agricultural and industrial sheds. These generally occur singly or in association with farmstead buildings. A collection of three such buildings, identical and in the array proposed does not relate particularly strongly to the existing local pattern. The addition of these buildings would change the balance of the local area such that buildings of this broad style begin to dominate, to the detriment of the wider landscape. Although the buildings are smaller than originally proposed, it will still be appropriate for the design to be individual and site specific, relating visually to the function, as was previously agreed. The applicant should explore more appropriate building forms.

5.6 Historic Environment Team : No objection. Disappointed that the applicant is proposing to move away from the previous innovative design of the PCUBs. However, the reduction in the scale of the revised buildings will have an overall reduction on the level of visual impact on the historic environment.

5.7 Historic Scotland : Disappointed that the proposed PCUBs do not appear to respond as appropriately to the existing landform compared with the previous consented scheme and do not reflect the previous distinctive contemporary design which sought to use high quality traditional and modern materials. Do not object as the impact of the proposals on the historic environment would be limited, it is for The Highland Council to be satisfied that the design and siting for the 3 ‘industrial shed-like’ buildings is appropriate in this location.

5.8 SNH : The applicant will require to obtain licence for otters (European Protected Species) from SNH before they can proceed with the development. Additional mitigation should also be included within any approval including an updated species protection plan for otters and a requirement for pre-construction checks for

water voles.

6. DEVELOPMENT PLAN POLICY

The following policies are relevant to the assessment of the application

6.1 Highland Wide Local Development Plan 2012

28 Sustainable Design 29 Design Quality and Place-Making 36 Development in the Wider Countryside 41 Business and Industrial Land 57 Natural, Built and Cultural Heritage 58 Protected Species 66 Surface Water Drainage 67 Renewable Energy Developments 69 Electricity Transmission Infrastructure

6.2 Caithness Local Plan (as continued in force)

7. OTHER MATERIAL CONSIDERATIONS

7.2 Highland Council Supplementary Planning Policy Guidance Highland Renewable Energy Strategy Sustainable Design Guide – Interim Supplementary Guidance

7.3 Scottish Government Planning Policy and Guidance Scottish Planning Policy National Planning Framework Pentland Firth and Orkney Waters Marine Spatial Plan Framework and Regional Locational Guidance for Marine Energy Historic Scotland Managing Change in the Historic Environment – Setting

8. PLANNING APPRAISAL

8.1 Section 25 of the Town and Country Planning (Scotland) Act 1997 requires planning applications to be determined in accordance with the development plan unless material considerations indicate otherwise.

8.2 This means that the application requires to be assessed against all policies of the Development Plan relevant to the application, all national and local policy guidance and all other material considerations relevant to the application.

8.3 Development Plan Policy Assessment

The principle of development is established through the existing planning permission 12/02874/FUL. This application is only for amended design of the PCUBs and the application site boundary only includes the area of the buildings and their immediate surroundings. The proposed buildings are within the area identified for PCUBs in the existing consent.

8.4 Material Considerations

8.5 Design and External Appearance The design and external appearance of the PCUBs previously approved was subject to extensive discussions with the Council and consultation bodies. The Planning Service, and consultation bodies, have expressed disappointment to the applicant with regard to the change in design of the PCUBs that has led to the submission of this application.

8.6 The design previously approved was considered to make a positive contribution to the architectural and visual quality of the place in which it is located. The scale, and massing of the buildings were considered to be reflective of their functional role, and the contemporary design reflected the innovative nature of this renewable energy project. The curved roofs were considered to reflect the undulation of the surrounding landscape and added a level of interest to the buildings. The use of a combination of metal and timber cladding with aluminium curved roofs for the external finish was welcomed. It was considered that there is little precedent for onshore development of this nature and that there is a need to provide a development that meets the needs of the developer while maintaining strong design values. The design, form and function of the proposed buildings were considered to reflect well the innovative nature of this new renewable energy source.

8.7 It is acknowledged that the amended proposal comprising 3 large sheds with rectangular form and dual pitched roofs seeks to replicate the simple form of agricultural sheds which are commonly found across the Caithness area. Indeed the views from the A836 and adjacent areas already contain many agricultural and industrial sheds. These generally occur singly or in association with farmstead buildings as opposed to the staggered layout proposed in an open landscape. In this case the location of the site, topography, and separation distance from other development means that the layout is not out of keeping with the character of the area. External finishing materials proposed are cladding systems finished in light grey/green with slightly contrasting flashings, facias and ventilation louvers from a more saturated mid grey/green colour spectrum. The colours have been selected on the basis that these are aligned to the natural colours of the local coastal/marine environment.

8.8 Overall, the design, scale and massing are not out of keeping with the character of the immediate or wider area. The details of external finishes and colours proposed are considered appropriate in principle. A condition should be attached requiring the submission of samples of materials and colours to be submitted to allow a more detailed assessment. The proposal is considered to accord with relevant

provisions of the Development Plan, particularly policies 28 and 29 of the adopted Highland wide Local Development Plan.

8.9 Third party representations received all make reference to the design of the buildings as summarised in section 4. One expresses disappointment at the change in design whilst the others support the reduction in size of the PCUBs and the simpler less demonstrative form of the buildings and consider that the current proposal reflects buildings of traditional industries and agriculture rather than the constructional language of an industrial estate or office park.

8.10 The issue of signage at the entrance to the site was raised by a third party, but this is out with the remit assessment of this application.

8.11 Landscape, Seascape and Visual Impacts It was recognised in the ES prepared for the existing consent that the proposal represents a large scale and fundamental change to the physical characteristics of the Ness of Quoys site and surrounding area. Photomontages were produced and points for visualisations were discussed and agreed at pre-application stage. The ES concluded that there is a significant change to the physical landscape.

8.12 The updated ES concludes that the landscape and seascape impact is reduced by the proposal, as the buildings are of a reduced scale, but is still significant given the scale of the overall proposal. The consented PCUBs have a height of 12.21m, the revised buildings have a height of 5.68m, a reduction in height of 6.53m. The consented PCUBs have a volume of 12,500m3, the revised 3,659m3, resulting in 8,841m3 reduction in volume. The amended PCUBs are within the footprint identified within the existing consent. The 3 buildings are staggered and step down with the gradual slope of the site.

8.13 Revised photomontages have been submitted. The 3 main points where impacts are significant are Canisbay Kirk, Canisbay Village and from the ferry route/Stroma.

8.14 From Canisbay Kirk, the proposal is a relatively close and prominent feature. The updated ES considers that the consented design breaks the open sea view and landscape horizon whereas the amended design is significantly smaller and lower so no longer breaks the horizon and the proposed change in form and colour means that the PCUBs will be more consistent with the prevailing landscape.

8.15 The updated ES also considers that the amended design will significantly reduce the impact from Canisbay village. The landform slopes away from the village down towards the Inner Sound, this opens the view north to Stroma and beyond. The amended design still breaks the sea/land horizon but it is considered that the amended height, form and colour significantly reduce the impact. The updated ES notes that although the impact is reduced, it is still significant.

8.16 The updated ES considers that the amended design significantly reduces the impact from Stroma and transiting vessels in the Inner Sound. The previously consented design was contained within the land horizon, but its form and finish made it a prominent feature. The ES notes that the amended design significantly reduces the impact from this view. Again, the ES concludes that the impact is still significant.

8.17 The principle of landscape and visual impacts of the proposal has been accepted in terms of the current consent. The findings of the updated ES are noted and the Planning Service agrees that the impact of the overall development is significant in this setting, but the amended proposal by virtue of reduction in scale and massing has a lesser impact than the existing consent.

8.18 Site levels and use of mounds and landscaping to lessen visual impacts has been raised by a third party representation. Submission of detailed site levels can be conditioned. Site landscaping is covered by the existing consent.

8.19 The proposal is considered acceptable in terms of the relevant provisions of the Development Plan.

8.20 Impact on Listed Building The updated ES considers that the impact on Canisbay Kirk will be reduced by the amendment but will remain significant overall. As noted above, Historic Scotland and the Council’s Historic Environment Team do not object to the proposal, although concerns have been raised about the move away from a contemporary design to sheds. There is no conflict with Policy 57 of the adopted Highland wide Local Development Plan.

8.21 Amenity, Noise, Lighting, Archaeology, Tourism and Public Access The current proposal does not raise any issues over and above those considered during processing of the application for the existing consent.

8.22 Protected Species and Licensing Survey work carried out prior to determination of the existing consent established the presence of otters (European Protected Species) and water voles (protected under the Wildlife and Countryside Act 1981 (as amended). The need for a licence from SNH was also identified. SNH provided a detailed consultation response in relation to the existing consent and have provided updated comments in relation to this current application.

8.23 SNH have reiterated that a licence will be required by the application before they proceed with development. The Planning Authority is required to be satisfied, in line with statutory duties under the Habitats Regulations 1994 (as amended), that the licensing tests set out in those regulations are likely to be met before approving the application.

8.24 SNH have advised that based on information currently available, it is likely that the tests would be met and that a licence would be granted (without prejudice to consideration of the actual licence application). The Planning Authority concurs with SNH’s opinion on the basis that: the proposal has a licensable purpose; the wider proposal will have beneficial consequences of primary importance to the environment given that it is a large scale renewable energy project; there is no satisfactory alternative to the proposal; and survey work has identified appropriate mitigation, ensuring the proposal will not be detrimental to the favourable

conservation status of the species.

8.25 In their consultation response SNH have requested that conditions be attached to this consent requiring submission of an updated species protection plan, and further monitoring of the site before and during the construction period.

8.26 SNH also requested a condition requiring that pre construction checks be carried out for water voles since more than 8 months has passed since the previous survey.

8.27 SNH have advised that The Scottish Parliament has recently introduced legislation to designate seal haul-out sites around Scotland. The coast at the Ness of Quoys is included as the Gills Bay designated sealhaul out site. After 30 September 2014 it will be an offence to intentionally or recklessly harass seals within the designated areas. SNH recommend that disturbance to seals is fully considered in respect of this new nationally important haul-out area. General disturbance to seals will depend on the nature of the activity and the proximity of the seals to the work.

8.28 The area which this current application covers is only the footprint of the PCUBs and associated hardstanding, currently agricultural fields. It is considered unlikely that this area will comprise a haul out area. SNH’s advice in relation to seals will be attached as an informative.

8.29 There is no conflict with Policy 57 of the adopted Highland wide Local Development Plan.

8.30 Environmental Protection SEPA previously provided consultation comments in relation to the existing consent and have provided updated comments for the current application reiterating the requirement for the submission of a site specific environmental management plan. This will be conditioned.

8.31 Other Considerations – not material

None

8.32 Matters to be secured by Section 75 Agreement

None

9. CONCLUSION

9.1 The principle of development is established through the existing consent which will remain live. The Council is fully supportive of the principle of the overall development and recognises the significant financial investment and environmental contribution that this makes to the delivery of renewable energy developments in this area. This application is only for amended design and external appearance of the PCUBs and as such the focus of this assessment is only on that basis. It is regrettable that there has been a change in design from an innovative design solution, unique to the site and the purpose of the development, to this amended proposal. It is

acknowledged that the scale and massing of the development has been significantly reduced, however it is disappointing that the design and form of the original buildings were not scaled down in a similar manner rather than the adoption of this amended approach. The suggested agrarian farmstead approach has merit in principle but is weakened in the absence of such functionally related buildings. The rationale presented behind the design change is noted. It is acknowledged that the amended design is aimed at allowing it to be absorbed within its landscape setting, given its resemblance to agricultural sheds, found in the local area. It is accepted that although the overall proposal will have landscape and visual impacts, the significant reductions in scale and massing of the PCUBs in this instance will lessen impacts to a degree which allows the amended design to be accepted. All relevant matters have been taken into account when appraising this application. It is considered that the proposal accords with the principles and policies contained within the Development Plan and is acceptable in terms of all other applicable material considerations.

10. RECOMMENDATION

Action required before decision issued N

Subject to the above, it is recommended the application be granted subject to the following conditions and reasons and notes to applicant:

1. No development or works (including site clearance) shall commence until a programme of work for the evaluation, preservation and recording of any archaeological and historic features affected by the proposed development/work, including a timetable for investigation, all in accordance with the attached specification, has been submitted to, and approved in writing by, the Planning Authority. The approved programme shall be implemented in accordance with the agreed timetable for investigation.

Reason: In order to protect the archaeological and historic interest of the site.

2. No development or works shall commence until a 3 month pre-commencement otter survey has been undertaken and a report of survey has been submitted to, and approved in writing by, the Planning Authority in consultation with SNH. The survey shall cover both the application site and an area of 200m in all directions from the boundary of application site and the report of survey shall include mitigation measures where any impact, or potential impact, on protected species or their habitat has been identified. This shall also include provision for future monitoring of the site leading up to and during the construction period, focussing on determining the breeding status of the holts and the identification of an new resting sites/holts, and measures to be implemented if additional resting sites/holts are found. Development and work shall progress in accordance with any mitigation

measures contained within the approved report of survey and the timescales contained therein.

Reason: To ensure that the site and its environs are surveyed and the development does not have an adverse impact on protected species or habitat. Identification of any new holts/resting sites may have licencing implications.

3. No development or works shall commence until an in-season water vole survey has been undertaken and a report of survey has been submitted to, and approved in writing by, the Planning Authority in consultation with SNH. The survey shall cover include all areas of suitable habitat within the development site and an appropriate buffer around it. Where any impact, or potential impact, on water voles or their habitat are identified the report of survey shall include a species protection plan which clearly set out any mitigation measures shall be submitted to and approved in writing by the Planning Authority in consultation with SNH. The survey shall also include measures for pre-construction checks, no more than 8 months before construction works commence. Development and work shall progress in accordance with any mitigation measures contained within the approved report of survey and the timescales contained therein.

Reason: To ensure that the site and its environs are surveyed and the development does not have an adverse impact on protected species or habitat.

4. No development shall commence until a schedule of external finishing materials (including samples) has been submitted to and approved in writing by the Planning Authority. Thereafter the development shall be completed and maintained in accordance with the approved details.

Reason: In the interests of visual amenity.

5. At least two months prior to the commencement of any works, a site specific environmental management plan (EMP) must be submitted for the written approval of the planning authority [in consultation with SEPA] [and other agencies such as SNH as appropriate] and all work shall be carried out in accordance with the approved plan.

Reason : To control pollution of air, land and water

6. No development shall commence on site until the site access has been formed to basecourse level in accordance with the details approved under consent 12/02874/FUL and to the satisfaction of the Planning and Roads Authorities.

Reason: To ensure that an adequate level of access is timeously provided for the

development; in the interests of road safety and amenity. 7. No development shall commence on site until a construction phase Traffic

Management Plan (including a routing plan) has been submitted to and approved

in writing by the Planning Authority. The approved Traffic Management Plan shall specify measures to address all traffic associated with the development during construction including signage, traffic control measures and timescales for their implementation. The traffic management plan as may be agreed shall be implemented in accordance with the details as may be approved and the measures shall remain in place until the development is complete.

Reason: In the interests of road safety.

8. No development shall commence until full details of existing and proposed ground

levels and finished floor levels have been submitted to and approved in writing by the Planning Authority. Thereafter the development shall be completed in accordance with the approved details.

Reason: In the interests of visual amenity.

9. No development shall commence until full details of any external lighting to be used within the site and/or along its boundaries and/or access have been submitted to, and approved in writing by, the Planning Authority. Such details shall include full details of the location, type, angle of direction and wattage of each light which shall be so positioned and angled to prevent any direct illumination, glare or light spillage outwith the site boundary. Thereafter only the approved details shall be implemented

Reason: In order to ensure that any lighting installed within the application site does not spill beyond the intended target area, does not impact adversely upon the amenity of adjacent properties and does not result in 'sky glow'. And, in order to safeguard the amenity of neighbouring properties and occupants.

10. Noise arising from the operation phase of this development shall not exceed

32dB(A) as measured as a 5 minute free field LAeq at any noise sensitive property

Reason: In order to safeguard the amenity of neighbouring properties and

occupants.

11. Notwithstanding the provisions of the Town and Country Planning (Control of

Advertisements) (Scotland) Regulations 1984 (as amended), and unless there is a demonstrable health and safety reason no signs, notices, flags, banners or other means of announcement or advertisement shall be displayed on any part of the site without the prior approval in writing of the Planning Authority.

Reason: In order to safeguard the established amenity of the area and to allow the Planning Authority to retain effective control over the development.

12. Notwithstanding the provisions of Article 3 and Class 14 of the Town & Country

Planning (General Permitted Development) (Scotland) Order 1992 (as amended, revoked or re-enacted; with or without modification), no development shall commence until full details of any temporary site compounds and storage areas (including their location, scale and means of enclosure) shall be submitted to, and approved in writing by, the Planning Authority. Thereafter, the site compounds and storage areas shall be formed in accordance with these approved details. Furthermore, all site compounds shall be maintained in a tidy, safe and secure fashion and be removed from the application site within one month of the development being completed.

Reason: To allow the Planning Authority to retain effective control over the

development

REASON FOR DECISION

The proposals accord with the provisions of the Development Plan and there are no material considerations which would warrant refusal of the application.

LIMIT FOR THE IMPLEMENTATION OF THIS PLANNING PERMISSION In accordance with Section 58 of the Town and Country Planning (Scotland) Act 1997 (as amended), the development to which this planning permission relates must commence within THREE YEARS of the date of this decision notice. If development has not commenced within this period, then this planning permission shall lapse. FOOTNOTE TO APPLICANT Initiation and Completion Notices The Town and Country Planning (Scotland) Act 1997 (as amended) requires all developers to submit notices to the Planning Authority prior to, and upon completion of, development. These are in addition to any other similar requirements (such as Building Warrant completion notices) and failure to comply represents a breach of planning control and may result in formal enforcement action. 1. The developer must submit a Notice of Initiation of Development in accordance

with Section 27A of the Act to the Planning Authority prior to work commencing on site.

2. On completion of the development, the developer must submit a Notice of Completion in accordance with Section 27B of the Act to the Planning Authority.

Copies of the notices referred to are attached to this decision notice for your convenience.

Accordance with Approved Plans & Conditions You are advised that development must progress in accordance with the plans approved under, and any conditions attached to, this permission. You must not deviate from this permission without consent from the Planning Authority (irrespective of any changes that may separately be requested at the Building Warrant stage or by any other Statutory Authority). Any pre-conditions (those requiring certain works, submissions etc. prior to commencement of development) must be fulfilled prior to work starting on site. Failure to adhere to this permission and meet the requirements of all conditions may invalidate your permission or result in formal enforcement action Flood Risk It is important to note that the granting of planning permission does not imply there is an unconditional absence of flood risk relating to (or emanating from) the application site. As per Scottish Planning Policy (p.198), planning permission does not remove the liability position of developers or owners in relation to flood risk. Scottish Water You are advised that a supply and connection to Scottish Water infrastructure is dependent on sufficient spare capacity at the time of the application for connection to Scottish Water. The granting of planning permission does not guarantee a connection. Any enquiries with regards to sewerage connection and/or water supply should be directed to Scottish Water on 0845 601 8855. Septic Tanks & Soakaways Where a private foul drainage solution is proposed, you will require separate consent from the Scottish Environment Protection Agency (SEPA). Planning permission does not guarantee that approval will be given by SEPA and as such you are advised to contact them direct to discuss the matter (01349 862021). Local Roads Authority Consent In addition to planning permission, you may require one or more separate consents (such as dropped kerb consent, a road openings permit, occupation of the road permit etc.) from TECS Roads prior to work commencing. These consents may require additional work and/or introduce additional specifications and you are therefore advised to contact your local TECS Roads office for further guidance at the earliest opportunity. Failure to comply with access, parking and drainage infrastructure requirements may endanger road users, affect the safety and free-flow of traffic and is likely to result in enforcement action being taken against you under both the Town and Country Planning (Scotland) Act 1997 and the Roads (Scotland) Act 1984.

Further information on the Council's roads standards can be found at: http://www.highland.gov.uk/yourenvironment/roadsandtransport Application forms and guidance notes for access-related consents can be downloaded from: http://www.highland.gov.uk/yourenvironment/roadsandtransport/roads/Applicationformsforroadoccupation.htm Mud & Debris on Road Please note that it an offence under Section 95 of the Roads (Scotland) Act 1984 to allow mud or any other material to be deposited, and thereafter remain, on a public road from any vehicle or development site. You must, therefore, put in place a strategy for dealing with any material deposited on the public road network and maintain this until development is complete.

Construction Hours and Noise-Generating Activities You are advised that construction work associated with the approved development (incl. the loading/unloading of delivery vehicles, plant or other machinery), for which noise is audible at the boundary of the application site, should not normally take place outwith the hours of 08:00 and 19:00 Monday to Friday, 08:00 and 13:00 on Saturdays or at any time on a Sunday or Bank Holiday in Scotland, as prescribed in Schedule 1 of the Banking and Financial Dealings Act 1971 (as amended).

Work falling outwith these hours which gives rise to amenity concerns, or noise at any time which exceeds acceptable levels, may result in the service of a notice under Section 60 of the Control of Pollution Act 1974 (as amended). Breaching a Section 60 notice constitutes an offence and is likely to result in court action.

If you wish formal consent to work at specific times or on specific days, you may apply to the Council's Environmental Health Officer under Section 61 of the 1974 Act. Any such application should be submitted after you have obtained your Building Warrant, if required, and will be considered on its merits. Any decision taken will reflect the nature of the development, the site's location and the proximity of noise sensitive premises. Please contact [email protected] for more information.

Public Access

In order to safeguard public access both during and after the construction phase of the development the 5m coastal access corridor identified on the plans shall be remain accessible and free from obstruction in perpetuity. The stock proof post post and wire fence on the southern boundary of this corridor shall not be barbed wire topped on the seaward side. During the operation of the proposal, access from the A836 should be open for non-motorised access by the general public. Access infrastructure such as gates should be left unlocked or with side pedestrian gates installed, including for the cattle grid. For the avoidance of doubt the access to the PCUB site at 334,567 973,066 can be secure and locked as required to restrict access to the “inner” field

of the site boundary during both construction and operation of the development as this area falls under the Land Reform (Scotland) Act 2003 Section 6 (1) (a) (i) and Section (g) (i), land over which access rights are not exercisable. Seals The Scottish Parliament has recently introduced legislation to designate seal haul-out sites around Scotland. The coast at the Ness of Quoys is included as the Gills Bay designated sealhaul out site. After 30 September 2014 it will be an offence to intentionally or recklessly harass seals within the designated areas. We recommend that disturbance to seals is fully considered in respect of this new nationally important haul-out area. General disturbance to seals will depend on the nature of the activity and the proximity of the seals to the work. More information can be found at the following page, www.scotland.gov.uk/Topics/marine/marineenvironment/species/19887/20814/haulouts

Signature: Dafydd Jones Designation: Area Planning Manager (North) Author: Emma Forbes Background Papers: Documents referred to in report and in case file. Relevant Plans: Plan 1 – 100 rev 5 Location Plan Plan 2 – 105 rev 8 Block Plan Plan 3 – 106 rev 8 Block Plan Plan 4 – 107 rev 8 Block Plan Plan 5 – 108 rev 6 Floor Plan Plan 6 – 109 rev 7 Section Plan Plan 7 – 110 rev 7 Elevations Existing consent (12/02874/FUL ) drawings for information Plan 8 – 000001 Location Plan Plan 9 – 107 rev 5 Block Plan completion Plan 10 – 108 rev 3 Floor Plan Plan 11 – 110 rev 2 Elevation Plan 10 - 109 rev 2 section

Appendix – Letters of Representation Name Address Date

Received For/Against

Mr Edward Taylor The Prince's Foundation for Building Community C/o Dumfries House

Cumnock

KA18 2NJ

31 July 2014 For

Mr Clifford Shepherd Quoys

Canisbay

KW1 4YH

31 July 2014 For

Miss Joyce Wilson 21 Castlehill Road

Stewarton

Kilmarnock

KA3 5ER

30 July 2014 Against

ARCHITECTS

0 500m

N

MEYGEN LIMITED

NESS OF QUOYS

100m 1000m 2500m

HRI

f: 01463 717247t: 01779 476576t: 01463 240066

AB42 3AWIV1 1DFAberdeenshireInverness-shirePETERHEADINVERNESSBurnside Business Centre17 Queensgate

[email protected]

www.hri-architects.com

PLANNING

1Location Plan1:10,000

Date: Checked :

Revision:Project Number: Drawing:

Description Date

Project Partner:

Project Leader:

Drawn:Scale:

© HRI Architects Ltd. All rights reserved.

SOUND TIDAL STREAMPENTLAND FIRTH INNER

Revision

12.12.11

AB

AB

Rev. 1 Issued to client. 21.12.11

Rev. 2

Rev. 3

I/6775

commentsAmmended to suit client

06.07.12

03.06.14

Location Plan

1:10,000@A3 VH

100 5

Ordnance Survey 0100031673© Crown copyright and database rights [2014]

Amended site boundary.

SITE

Rev. 4 Amended redline area. 26.06.14

Rev. 5 Amended redline area. 10.07.14

N

0 50m 100m 150m 200m 250m

ARCHITECTS

NESS OF QUOYS

MEYGEN LIMITED

from PCUB buildings

surface water drainage system

from road to connect to

Surface water drainage

1:10001Site Plan

A836 to John O'GroatsA836

to Thurso

Lay-by

Field

post & wire fe

nce

Field

Rocks

Rocks

Field

Field

5m wide zone for coastal footpath

Field

Graveyard

post

& wire fence

Field

Quoys

Field

Passing place

Gate

Refer to drawing no 111.with Caithness stone.Screen wall formed

A836verge

verge

stock proof fenceNew post & wire

logo - refer to detail.incorporating MeyGenCaithness stone wall

details refer to URS drawings.collection point to engineers Layby and refuse bin

verge

Sto

ck pro

of post

& wire fence

post & wire fenceStock proof

requirement: 12 cars)Total parking PCUB buildingin front of each hardstandingsituated on (Car parking to be

Stock pro

of p

ost & wire fe

nce

Stock proof post & wire fence

headTurning

Stone pileSite 416

rainwater runoff.Soakaway for

HDD compound.Area of progressive

Stone dykeSite 415

EnclosureSite 414

WellLyrequoySite 242

Stone pileSite 413

(remains of)St Mary's Chapel

FarmsteadQuoysSite 66

WellSite 412

MoundKirkstyleSite 64

Commerative monumentCanisby ChurchyardSite 55

5m

beneath road

Existing culvert

(below ground)

Drainage pipe

(existing)

Open ditch drain

HRI

f: 01463 717247t: 01779 476576t: 01463 240066

AB42 3AWIV1 1DFAberdeenshireInverness-shirePETERHEADINVERNESSBurnside Business Centre17 Queensgate

[email protected]

www.hri-architects.com

Date: Checked :

Revision:Project Number: Drawing:

Date

Project Partner:

Project Leader:

Drawn:Scale:

© HRI Architects Ltd. All rights reserved.

Revision Description

PLANNING

SOUND TIDAL STREAMPENTLAND FIRTH INNER

AB

AB

MAW

12.12.11

105

05.07.12

Rev. 1 Issued to client. 21.12.11

Rev. 2

Rev. 3

Rev. 4

Rev. 5

comments.Amendments to suit Client

Font size increased.

altered. Re-issued to Client.Notes altered, boundary line 18.01.12

03.04.12

12.04.12

I/6775 8

no 111.facilities - refer to drawingControl Room & staff

trenchescable

Legend:

Enclosure

Site 258

Service/turning area

PCUBs - locations TBCBelow ground cable feeds to

MHWL5m wide coastal footpath along

by ORCA Archaeological site identified

Application site boundary

to SHEPD sub-stationRoute of below ground cables

to engineers specification4m wide tarmac access road

compound & temporary supply to HDDdrainage to Control BuildingPermanent septic tank &

Soakaway for roof drainage

supply to HDD compound to Control Building & temporary Permanent main water supply

comments.Amendments to suit Client

& PCUB basesPhase 1c HDD boresBlock Plan;

Rev. 6 10.02.14Revised layout for Planning.

trenchescable

lightingmajority of floodDirection of the

CONTAINER

CREW

CONTAINER

OFFICE

TANK

MUD

UNIT

RECYCLING

GENERATORS BENTONITE

POWER UNIT

CONTROL LAB /

MUD PIT

ENTRY PIT

DRIL

L PIP

E R

AC

KC

ON

TAIN

ER

MA

GAZIN

DRIL

LIN

G RIG

Flood lights

boresHDD

area

lay-down

CONTAINER

CREW

CONTAINER

OFFICE

TANK

MUD

UNIT

RECYCLING

GENERATORS BENTONITE

POWER UNIT

CONTROL LAB /

MUD PIT

ENTRY PIT

DRIL

L PIP

E R

AC

K

CO

NTAIN

ER

MAG

AZIN

DRIL

LIN

G RIG

boresHDD

Flood lights

lightingmajority of floodDirection of the

Phase 1ccompletion ofreinstated at Topsoil to be

for drilling cuttings.Additional storage

topsoil.strippedmound ofTemporary

owned 33kV cableRoute of SHEPD

road to create looptemporary construction Optional additional

trenchescable

engineers specification.

Private hardcore road to

Field

Rev. 7 26.06.14PCUB plan revised.

1:2000 @ A31:1000 @ A1

Refer to dwg no 104

Phase 1a & 1b

PCUB 1

kioskSwitch

6700m2of site:area Approx

PCUB 2

and base for

Foundations

PCUB 3

and base for

Foundations

Rev. 8 08.07.14PCUBs 2 & 3 re-located.

973000m

335000

m

N

0 50m 100m 150m 200m 250m

ARCHITECTS

NESS OF QUOYS

MEYGEN LIMITED

Phase 1c.at completion ofReinstate topsoil

1:10001Site Plan

A836 to John O'GroatsA836

to Thurso

Lay-by

Field

post & wire fe

nce

Field

Rocks

Rocks

Field

Field

5m wide zone for coastal footpath

Field

Graveyard

post

& wire fence

Field

Quoys

Field

Passing place

Gate

Refer to drawing no 111.with Caithness stone.Screen wall formed

A836verge

verge

stock proof fenceNew post & wire

logo - refer to detail.incorporating MeyGenCaithness stone wall

details refer to URS drawings.collection point to engineers Layby and refuse bin

verge

Sto

ck pro

of post

& wire fence

post & wire fenceStock proof

requirement: 12 cars)Total parking PCUB buildingin front of each hardstandingsituated on (Car parking to be

Stock pro

of p

ost & wire fe

nce

Stock proof post & wire fence

headTurning

Stone pileSite 416

rainwater runoff.Soakaway for

Stone dykeSite 415

EnclosureSite 414

WellLyrequoySite 242

Stone pileSite 413

(remains of)St Mary's Chapel

FarmsteadQuoysSite 66

WellSite 412

MoundKirkstyleSite 64

Commerative monumentCanisby ChurchyardSite 55

5m

beneath road

Existing culvert

(below ground)

Drainage pipe

(existing)

Open ditch drain

HRI

f: 01463 717247t: 01779 476576t: 01463 240066

AB42 3AWIV1 1DFAberdeenshireInverness-shirePETERHEADINVERNESSBurnside Business Centre17 Queensgate

[email protected]

www.hri-architects.com

Date: Checked :

Revision:Project Number: Drawing:

Date

Project Partner:

Project Leader:

Drawn:Scale:

© HRI Architects Ltd. All rights reserved.

Revision Description

PLANNING

SOUND TIDAL STREAMPENTLAND FIRTH INNER

AB

AB

MAW

12.12.11

106

05.07.12

Rev. 1 Issued to client. 21.12.11

Rev. 2

Rev. 3

Rev. 4

Rev. 5

comments.Amendments to suit Client

Font size increased.

altered. Re-issued to Client.Notes altered, boundary line 18.01.12

03.04.12

12.04.12

I/6775 8

no 111.facilities - refer to drawingControl Room & staff

trenchescable

comments.Amendments to suit Client

Rev. 6 10.02.14Revised layout for Planning.

trenchescable

boresHDD

owned 33kV cableRoute of SHEPD

Legend:

Enclosure

Site 258

Service/turning area

PCUBs - locations TBCBelow ground cable feeds to

MHWL5m wide coastal footpath along

by ORCA Archaeological site identified

Application site boundary

to SHEPD sub-stationRoute of below ground cables

to engineers specification4m wide tarmac access road

Soakaway for roof drainage

to SHETL sub-stationRoute of below ground cables

to Control BuildingPermanent main water supply

drainage to Control BuildingPermanent septic tank &

Phase 1c PCUBsBlock Plan;

trenchescable

cable to sub-station.HV2 underground

cable to sub-station.HV3 underground

engineers specification.

Private hardcore road to

Field

from PCUB buildings

surface water drainage system

from road to connect to

Surface water drainage

Gate

Stock pro

of p

ost & wire fe

nce

headTurning

5m

Refer to dwg no 104

Phase 1a & 1b

PCUB 1

Refer to dwg no 104

Phase 1c

PCUB 2

Refer to dwg no 104

Phase 1c

PCUB 3

Rev. 7 26.06.14PCUB plan revised.

1:2000 @ A31:1000 @ A1

Rev. 8 08.07.14PCUBs 2 & 3 re-located.

kioskSwitch

6700m2of site:area Approx

973000m

335000

m

N

0 50m 100m 150m 200m 250m

ARCHITECTS

NESS OF QUOYS

MEYGEN LIMITED

from PCUB buildings

surface water drainage system

from road to connect to

Surface water drainage

1:10001Site Plan

A836 to John O'GroatsA836

to Thurso

Lay-by

Field

post & wire fe

nce

Field

Rocks

Rocks

Field

Field

5m wide zone for coastal footpath

Field

Graveyard

post

& wire fence

Field

Field

Quoys

Field

Passing place

Gate

Refer to drawing no 111.with Caithness stone.Screen wall formed

A836verge

verge

stock proof fenceNew post & wire

logo - refer to detail.incorporating MeyGenCaithness stone wall

details refer to URS drawings.collection point to engineers Layby and refuse bin

verge

Sto

ck pro

of post

& wire fence

post & wire fenceStock proof

requirement: 12 cars)Total parking PCUB buildingin front of each hardstandingsituated on (Car parking to be

Stock pro

of p

ost & wire fe

nce

Stock proof post & wire fence

headTurning

Stone pileSite 416

rainwater runoff.Soakaway for

Stone dykeSite 415

EnclosureSite 414

WellLyrequoySite 242

Stone pileSite 413

(remains of)St Mary's Chapel

FarmsteadQuoysSite 66

WellSite 412

MoundKirkstyleSite 64

Commerative monumentCanisby ChurchyardSite 55

5m

beneath road

Existing culvert

(below ground)

Drainage pipe

(existing)

Open ditch drain

HRI

f: 01463 717247t: 01779 476576t: 01463 240066

AB42 3AWIV1 1DFAberdeenshireInverness-shirePETERHEADINVERNESSBurnside Business Centre17 Queensgate

[email protected]

www.hri-architects.com

Date: Checked :

Revision:Project Number: Drawing:

Date

Project Partner:

Project Leader:

Drawn:Scale:

© HRI Architects Ltd. All rights reserved.

Revision Description

PLANNING

SOUND TIDAL STREAMPENTLAND FIRTH INNER

AB

AB

MAW

12.12.11

107

05.07.12

Rev. 1 Issued to client. 21.12.11

Rev. 2

Rev. 3

Rev. 4

Rev. 5

comments.Amendments to suit Client

Font size increased.

altered. Re-issued to Client.Notes altered, boundary line 18.01.12

03.04.12

12.04.12

I/6775 8

no 111.facilities - refer to drawingControl Room & staff

comments.Amendments to suit Client

Rev. 6 10.02.14Revised layout for Planning.

boresHDD

kioskSwitch

owned 33kV cableRoute of SHEPD

cable to sub-station.HV2 underground

cable to sub-station.HV3 underground

reinstatement.Phase 1 completion &Block Plan;

Legend:

Enclosure

Site 258

Service/turning area

MHWL5m wide coastal footpath along

by ORCA Archaeological site identified

Application site boundary

to SHEPD sub-stationRoute of below ground cables

to engineers specification4m wide tarmac access road

Soakaway for roof drainage

to SHETL sub-stationRoute of below ground cables

to Control BuildingPermanent main water supply

drainage to Control BuildingPermanent septic tank &

2m from buildingspost & wire fencenew stock proof

PCUB 1

engineers specification.

Private hardcore road to

2m from buildingspost & wire fencenew stock proof6700m2

of site:area Approx

PCUB 2

PCUB 3

Rev. 7 26.06.14PCUB plan revised.

1:2000 @ A31:1000 @ A1

Rev. 8 08.07.14PCUBs 2 & 3 re-located.

973000m

335000

m

NE

SS

OF Q

UO

YS

ME

YG

EN

LIMITE

D

N0

50m100m

150m200m

250m150m

200m250m

hri-architects

Date:

Scale:

Draw

n:

Project N

umber:

Project P

artner:

AB

Project Leader:

Draw

ing:

Revision:

Copyright H

RI-Architects

Revision

Description

Date

AB

PE

NTLA

ND

FIRTH

INN

ER

SO

UN

D TID

AL S

TRE

AM

MA

W

12.12.11I.6775

1:10001

Site P

lan1:1000 @

A1A

836 to John O'G

roatsA

836 to Thurso Lay-by107

Field

Field

Rocks

Rocks

Field

Field

5m w

ide zone for coastal footpath

Field

Graveyard

Field

Quoys

Field

Block P

lan;P

hase 1 completion &

reinstatement.

Rev. 1

Issued to client.21.12.11

Rev. 2

18.01.12N

otes altered, boundary linealtered. R

e-issued to Client.

Stock proof

post & wire fence

(Car parking to be

situated onhardstandingin front of eachP

CU

B buildingTotal parkingrequirem

ent: 12 cars) Stock proof post & wire fence

Control R

oom & staff

facilities - refer to drawing

no 111.S

creen wall form

edw

ith Caithness stone.

Refer to draw

ing no 111.

post & wire fence

post & wire fence

Field

Passing place

Gate

Cattle G

rid

Cattle G

rid

A83 6

ve rge

ve rge

New

post & wire

stock proof fence

Caithness stone w

allincorporating M

eyGen

logo - refer to detail.

Layby and refuse bincollection point to engineersdetails refer to U

RS draw

ings.

ve rge

Stock proof post & wire fence

Stock proof post & w

ire fence

Turninghead

Sw

itchkiosk P

CU

B 1PC

UB 3

PC

UB 2

Site 416

Stone pile

Site 242

LyrequoyW

ell

Site 413

Stone pile

Site 415

Stone dyke

Site 414

Enclosure

Site 64

Kirkstyle

Mound

HV

2 undergroundcable to sub-station.

HV

3 undergroundcable to sub-station.

Private tarm

ac road toengineers specification.

Site 412

Well

Site 55

Canisby C

hurchyardC

omm

erative monum

ent

St M

ary's Chapel

(remains of)

Site 66

Quoys

Farmstead

Rev. 3

Font size increased.03.04.12

Rev. 4

Am

endments to suit C

lientcom

ments.

12.04.12

5

Legend:

new stock proof

post & wire fence

2m from

buildings

Route of SH

EPDow

ned 33kV cable

17 Queensgate, Inverness, IV1 1D

F

Tel /01463 240066

Fax /01463 717247

11 Burnside B

usiness Centre,

Burnside R

oad, Peterhead, AB42 3AW

Tel /01779 476576

E-m

ail / adm

[email protected]

Web /

ww

w.hri-architects.com

Site 258

Enclosure

Service/turning area

5m w

ide coastal footpath alongM

HW

L

Archaeological site identified

by OR

CA

Application site boundary

Route of below

ground cablesto S

HE

PD

sub-station

4m w

ide tarmac access road

to engineers specification

Soakaw

ay for roof drainage

Route of below

ground cablesto S

HE

TL sub-stationP

ermanent m

ain water supply

to Control B

uildingP

ermanent septic tank &

drainage to Control B

uilding

Existing culvertbeneath road

Drainage pipe

(below ground)

Surface w

ater drainagefrom

road to connect tosurface w

ater drainage systemfrom

PCU

B buildings

Rev. 5

Am

endments to suit C

lientcom

ments.

05.07.12

Open ditch drain

(existing)

973000m

335000m

MEY

GEN

TH

E T

IDE O

F CH

AN

GE IN

CA

ITHN

ESS

4m

5m

ARCHITECTS

MEYGEN LIMITED

NESS OF QUOYS

0 10m5m1m

N Date: Checked :

Revision:Project Number: Drawing:

Description Date

Project Partner:

Project Leader:

Drawn:Scale:

© HRI Architects Ltd. All rights reserved.

Revision

12.12.11

AB

AB

1:100@A1

HRI

f: 01463 717247t: 01779 476576t: 01463 240066

AB42 3AWIV1 1DFAberdeenshireInverness-shirePETERHEADINVERNESSBurnside Business Centre17 Queensgate

[email protected]

www.hri-architects.com

PLANNING

SOUND TIDAL STREAMPENTLAND FIRTH INNER

Rev. 1 Issued to client. 21.12.11

Rev. 2 18.01.12

Rev. 3 23.04.12Notes amended.

Rev. 4 16.05.13Plan altered.

Re-issued to client.Drainage layout altered. Building handed.

108 6

MAW

I/6775

Rev. 5 10.02.14

1:100

PCUB Floor Plan - Phase 1a/1b

equipment layoutconstruction & new reflect altered wallPCUB plan revised to

aluminium RWP150mm Ø

To soakaway

Converter 1

+A07

=Op Isol

(Vacn

Cont)

+A0=

CC

U

+A02

=POU1

(Grid)

+A01

=FIU

+A03

=POU3

(Generator)

+A04

=DLU

DC Link

Unit

+A06

=WCU

Water

Cooling

Unit

+A05

=SFU

(Sine

Filter)

Converter 3

+A07

=Op Isol

(Vacn

Cont)

+A0=

CC

U

+A02

=POU1

(Grid)

+A01

=FIU

+A03

=POU3

(Generator)

+A04

=DLU

DC Link

Unit

+A06

=WCU

Water

Cooling

Unit

+A05

=SFU

(Sine

Filter)

Converter 2

+A07

=Op Isol

(Vacn

Cont)

+A0=

CC

U

+A02

=POU1

(Grid)

+A01

=FIU

+A03

=POU3

(Generator)

+A04

=DLU

DC Link

Unit

+A06

=WCU

Water

Cooling

Unit

+A05

=SFU

(Sine

Filter)

Converter 4

+A07

=Op Isol

(Vacn

Cont)

+A0=

CC

U

+A02

=POU1

(Grid)

+A01

=FIU

+A03

=POU3

(Generator)

+A04

=DLU

DC Link

Unit

+A06

=WCU

Water

Cooling

Unit

+A05

=SFU

(Sine

Filter)

Converter 5

+A07

=Op Isol

(Vacn

Cont)

+A0=

CC

U

+A02

=POU1

(Grid)

+A01

=FIU

+A03

=POU3

(Generator)

+A04

=DLU

DC Link

Unit

+A06

=WCU

Water

Cooling

Unit

+A05

=SFU

(Sine

Filter)

Converter 6

+A07

=Op Isol

(Vacn

Cont)

+A0=

CC

U

+A02

=POU1

(Grid)

+A01

=FIU

+A03

=POU3

(Generator)

+A04

=DLU

DC Link

Unit

+A06

=WCU

Water

Cooling

Unit

+A05

=SFU

(Sine

Filter)

01 02 03 04 06

INTERCONNECTOR

33k

V S

witchboard

Charger

Changing

DCS Panel Layout

05

LVAC Board

SHEPD INCOMER

FDR CONVERTER 1

FDR CONVERTER 2

FDR CONVERTER 3

FDR CONVERTER 4

FDR CONVERTER 5

FDR CONVERTER 6

AUX FDR & TRAFO

01 02 03 04 0605

Batteries

1U

1V

1W

2U

2W

2V

1U

1V

1W

2U

2W

2V

Rev. 6 26.06.14reflect new layoutPCUB plan revised to

Phase 1a & 1bPCUB Floor Plan

3109

RWPaluminium 150mm Ø

aluminium RWP150mm Ø

150mm dia U

PVC surface w

ater drainaluminium RWP150mm Ø

To soakaway

PCUB Phase 1a

1 2 3 4 5 6 7

E

D

C

B

A

Work StationsEngineering

Meeting Room

Area Allocated to Turbine OEM'S

Comms Room

WC

Mess

Conduit

Flexible

RoomSHEPD

Metering RoomLV Supply &

RoomStore

RoomStore Lobby

Cooler

Converter 1

INCOMING SUPPLY

METER

OUTGOING

Cooler

Converter 2

Cooler

Converter 3

Cooler

Converter 4

Cooler

Converter 5

Cooler

Converter 6

BoxesSplitter

BoxesSplitter

Ventilation louvres Ventilation louvres Ventilation louvres

1U

1V

1W

2U

2W

2V

1U

1V

1W

2U

2W

2V

1U

1V

1W

2U

2W

2V

1U

1V

1W

2U

2W

2V

5000 5000 5000 5000 5000 5000

TBCTBC

30630 (TBC)

45630 (TBC)

4250

4250

4250

4250

17893 (

TB

C)

TB

CT

BC

1500

24002000

3000

drainage channel

concrete platt

4000

4000

5325

platt

concrete

2852

868

2500

6348

1708 1800 1950 1800 23372

458 1800647

1952 1398 1952

5315

1026

11552

2420mm high215mm wide x blockwork walls:

(full height)'C' stud partition 146 S 50 Gypframe

(full height)'C' stud partition 70 S 50 Gypframe

ExitEmergency

5013 2000 5190 2000 3000 2000 3220

109

2

109

1

109

Hammerfest x1Atlantis x1ABB x3

1

(future expansion zone)PCUB Phase 1b

NESS OF QUOYS

MEYGEN LIMITED

1 2 3 4 5 6 7

A

B

C

D

E

42900

26384

780078007800780078003900

7317

5875

8125

5067

4931900400047002200560022005600220056002200415012001350493

493

23834

1200

1350

493

43886

27370

hri-architects17 Queensgate, Inverness, IV1 1DF

Tel / 01463 240066Fax / 01463 717247E-mail / [email protected] / www.hri-architects.com

Date:

Scale:

Drawn:

Project Number:

Project Partner:

AB

Project Leader:

Drawing:

Revision:

Copyright HRI-Architects

Revision Description Date

AB

PENTLAND FIRTH INNER SOUND TIDAL STREAM

MAW

12.12.11

1:100 @ A1

Rev. 1

1:1001

8MW module

33kV switchgear

Extract duct at high level ducting to outside air

This section of

wall to b

e left o

ut and b

uilt once the c

ontainers h

ave b

een installed.

Transformer

150mm dia U

PVC surface w

ater drain

To soakaway

1 2 3 45 6 7 89 10 11 1213 14 15 1617 18 19 2021

I.6775108

Transformer

Transformer

Transformer

Transformer

Transformer

Transformer

Transformer

Transformer

Transformer

Transformer

Transformer

8MW module8MW module

Typical Floor Plan

Typical PCUB FloorPlan

3

105

3

Issued to client. 21.12.11

Wall Construction:300mm thick concrete wall (2400kg/m3)with waterproofing agent all as per structuralengineers specification and to have steelshutter finish both sides.

150mm diaaluminium RWP

150mm diaaluminium RWP

150mm diaaluminium RWP

150mm diaaluminium RWP

2040x 1100mm Solid core doorsetwith galvanised steel cover plate toouter side and door edges.

2040x 1100mm Solid core doorsetwith galvanised steel cover plate toouter side and door edges.

2no 2040x 1150mm Solid core doorsetwith galvanised steel cover plate toouter side and door edges.

Duct out of building andcable to sub-station

Wall Construction:Metsec cladding rails to structural engineers designwith dense rock fibre sound insulation packed betweencladding rails.Perforated vertical Rigisystems 20 / 100 / 1000 whitesteel inner liner.10mm high performance cement particle board outersheet fixed to cladding rails.Sotech Optima FC or equal and approved zinc rainscreencladding system fitted horizontally with min 30mm airspacebehind and 70mm moisture resistant insulation fitted betweensupport system and to face of cement particle board.o

Cable ducts below groundto bring 21 cables fromsub-sea turbines. Maximum3no cables per duct.

Future8MW module

To other PCUBs / soakaway

Rev. 2 18.01.12Building handed. Drainage layout altered. Re-issued to client.

1

105

2

105

Rev. 3 05.07.12Ammendments to suit clientscomments

NESS OF QUOYS

MEYGEN LIMITED

hri-architects17 Queensgate, Inverness, IV1 1DF

Tel / 01463 240066Fax / 01463 717247E-mail / [email protected] / www.hri-architects.com

Date:

Scale:

Drawn:

Project Number:

Project Partner:

AB

Project Leader:

Drawing:

Revision:

Copyright HRI-Architects

Revision Description Date

AB

PENTLAND FIRTH INNER SOUND TIDAL STREAM

MAW

Sections

12.12.11

1:100 @ A1

Rev. 1

I.6775109

2

Issued to client. 21.12.11

7317587581255067

3000

Floor Construction:Dig down to required level and firm bearing stratato structural engineers requirements.Prepare and grade strata, and fill any soft spotsto structural engineers requirements.Lay minimum 150mm Type 2 sub-base and compactto structural engineers requirements.50mm blinding.1200guage DPM with taped joints and turned up at edges.200mm C35 concrete floor slab with 2no layers A252 meshreinforcement all to structural engineers requirements. Concreteto have steel float finish and expansion, contraction, induced andconstruction joints to structural engineers requirements.Surface of concrete to be sealed.

Foundations:Pad and strip foundations to structural engineers design.

A B C D E

26384

27370

3008360123006110300

6022

7852

11492

8640

Wall Construction:300mm thick concrete wall (2400kg/m3)with waterproofing agent all as per structuralengineers specification and to have steelshutter finish both sides.

2073

526

7037

Harmer AV600F roof outlets in metal box gutterwith 2no 150mm diameter mill finish aluminiumrainwater pipes to drainage system.Mill finish aluminium flat flashing to fascia and soffit.

Roof Construction:Steel structure to structural engineers design.Metsec double span purlin system to SE design.Roof cladding system by Rigisystems or equaland approved, Ziplock 300 1.2mm thick mill finishstucco aluminium top sheet fixed to Thermohaltersupport system, 200mm thick rockfibre soundinsulation, 20 / 100 / 1000 steel liner deck, vapourcontrol layer, 30mm acoustic insulation tissue faced,top hat sections to manufacturers recommendations,pan perforated liner sheet to provide sound attenuation.

3143

526

5252

7317587581255067

3000

A B C D E

26384

27370

3008360123006110300

6022

7852

11492

8640

2073

526

7037

Harmer AV600F roof outlets in metal box gutterwith 2no 150mm diameter mill finish aluminiumrainwater pipes to drainage system.Mill finish aluminium flat flashing to fascia and soffit.

Roof Construction:Steel structure to structural engineers design.Metsec double span purlin system to SE design.Roof cladding system by Rigisystems or equaland approved, Ziplock 300 1.2mm thick mill finishstucco aluminium top sheet fixed to Thermohaltersupport system, 200mm thick rockfibre soundinsulation, 20 / 100 / 1000 steel liner deck, vapourcontrol layer, 30mm acoustic insulation tissue faced,top hat sections to manufacturers recommendations,pan perforated liner sheet to provide sound attenuation.

3143

526

5252

1:1001Typical Section

1:1002Typical Section

1:1003Typical Section

1 2 3 4 5 6 7

Wall Construction:300mm thick concrete wall (2400kg/m3)with waterproofing agent all as per structuralengineers specification and to have steelshutter finish both sides.

Foundations:Pad and strip foundations to structural engineers design.

3

3

Extract duct to remove excess heat.

Replacement air vents

Extract duct to remove excess heat.

Mechanical extract fan.

Louvre vents.

General Wall Construction:Metsec cladding rails to structural engineers designwith dense rock fibre sound insulation packed betweencladding rails.Perforated vertical Rigisystems 20 / 100 / 1000 whitesteel inner liner.10mm high performance cement particle board outersheet fixed to cladding rails.Sotech Optima FC or equal and approved zinc rainscreencladding system fitted horizontally with min 30mm airspacebehind and 70mm moisture resistant insulation fitted betweensupport system and to face of cement particle board.o

General Wall Construction:Metsec cladding rails to structural engineers designwith dense rock fibre sound insulation packed betweencladding rails.Perforated vertical Rigisystems 20 / 100 / 1000 whitesteel inner liner.10mm high performance cement particle board outersheet fixed to cladding rails.Sotech Optima FC or equal and approved zinc rainscreencladding system fitted horizontally with min 30mm airspacebehind and 70mm moisture resistant insulation fitted betweensupport system and to face of cement particle board.o

General Wall Construction:Metsec cladding rails to structural engineers designwith dense rock fibre sound insulation packed betweencladding rails.Perforated vertical Rigisystems 20 / 100 / 1000 whitesteel inner liner.10mm high performance cement particle board outersheet fixed to cladding rails.Sotech Optima FC or equal and approved zinc rainscreencladding system fitted horizontally with min 30mm airspacebehind and 70mm moisture resistant insulation fitted betweensupport system and to face of cement particle board.o

1 2

Rev. 2 18.01.12Building handed. Re-issued to Client.

ARCHITECTS

MEYGEN LIMITED

NESS OF QUOYS

0 10m5m1m

5930

3250

2750

Date: Checked :

Revision:Project Number: Drawing:

Description Date

Project Partner:

Project Leader:

Drawn:Scale:

© HRI Architects Ltd. All rights reserved.

Revision

12.12.11

AB

AB

1:100@A1

HRI

f: 01463 717247t: 01779 476576t: 01463 240066

AB42 3AWIV1 1DFAberdeenshireInverness-shirePETERHEADINVERNESSBurnside Business Centre17 Queensgate

[email protected]

www.hri-architects.com

PLANNING

SOUND TIDAL STREAMPENTLAND FIRTH INNER

Rev. 1 Issued to client. 21.12.11

Rev. 218.01.12

Rev. 3 16.05.13

109 7

MAW

I/6775

Re-issued to client.Building handed.

Building altered.

Rev. 4 10.02.14

1:100

Typical Section

construction to reflect altered wall PCUB sections revised

Rev. 5 26.06.14to reflect altered layoutPCUB sections revised

E D C B A

RoomStore Changing

RoomStore

Work StationsEngineering

7654321

1:100

Typical Section2

1:100

Typical Section3

1

Lobby PCUB Phase 1a

Cooler RoomConverter

(future expansion zone)PCUB Phase 1b

17000

4250 4250 4250 4250

2420

30000

5000 5000 5000 5000 5000 5000

3

2 1

17453

30190

Foundations to S.E. design

RoomSHEPD

coated highline gutterDouble sided plastisol

to S.E. designfixed to galvanised steel purlinsLP / LPCB insulated roof panelsKingspan 140mm thick KS1000Roof Construction:

Steel portal frame to S.E. designwall panel fixed to secondary framingKingspan horizontal compositeGeneral Wall Construction

specification.on Type 1 fill material to S.E. DPM on 50mm sand blinding 30mm Rockwool Rockfloor onfloat finish and sealer.floor slab to S.E. design. Steel150mm thick reinforced concreteFloor Construction:

Phase 1a & 1bPCUB Sections

Rev. 6 08.07.14Building height altered.

PCUB Phase 1a

Cooler RoomConverter

3

E D C B A

Rev. 7 Building height altered. 10.07.14

15°

ARCHITECTS

MEYGEN LIMITED

NESS OF QUOYS

0 10m5m1m

Date: Checked :

Revision:Project Number: Drawing:

Description Date

Project Partner:

Project Leader:

Drawn:Scale:

© HRI Architects Ltd. All rights reserved.

Revision

12.12.11

AB

AB

1:100@A1

HRI

f: 01463 717247t: 01779 476576t: 01463 240066

AB42 3AWIV1 1DFAberdeenshireInverness-shirePETERHEADINVERNESSBurnside Business Centre17 Queensgate

[email protected]

www.hri-architects.com

PLANNING

SOUND TIDAL STREAMPENTLAND FIRTH INNER

Rev. 1 Issued to client. 21.12.11

Rev. 2 18.01.12

Rev. 3 16.05.13

110 7

MAW

I/6775

Re-issued to client.Building handed.

Building altered.

Rev. 4 10.02.14construction to reflect altered wall PCUB elevtions revised

to reflect altered layoutPCUB sections revised

26.06.14Rev. 5

Phase 1a & 1bPCUB Elevations

EDCBA

1:1001South-East Elevation

E D C B A

1:1002North-West Elevation

1:1004South-West Elevation

1:1003North-East Elevation

ventilation louvres ventilation louvres ventilation louvresventilation louvres ventilation louvresventilation louvres

(future expansion zone)PCUB Phase 1b

(future expansion zone)PCUB Phase 1b

Rev. 6 08.07.14Building height altered.

ventilation louvres ventilation louvres ventilation louvresventilation louvres ventilation louvres ventilation louvres

2750

Rev. 7 Building height altered. 10.07.14

Kingspan composite wall panels Kingspan composite wall panels

Kingspan composite wall panels

Kingspan insulated roof cladding

Kingspan composite wall panels

Kingspan insulated roof cladding

7 6 5 4 3 2 18910

7654321 8 9 10

hri-architects17 Queensgate, Inverness, IV1 1DF

Tel / 01463 240066Fax / 01463 717247E-mail / [email protected] / www.hri-architects.com

Rev. 1 Issued to client. 21.12.11

Rev. 2 18.01.12Building handed. Re-issued to Client.

21:1004North-East Elevation

1:1001North-West Elevation1:1002South-East Elevation

1:100

South-West Elevation3

Date:

Scale:

Drawn:

Project Number:

Project Partner:

AB

Project Leader:

Drawing:

Revision:

Copyright HRI-Architects

Revision Description Date

AB

PENTLAND FIRTH INNER SOUND TIDAL STREAMNESS OF QUOYS

MEYGEN LIMITED

MAW

12.12.11

1:100 @ A1

I.6775

A B C D E ABCDE

7 6 5 4 3 2 1

PCC BuildingTypical Elevations

110

Mill finish standing seam aluminium cladding

Mill finish standing seam aluminium cladding

European Larch or Western red cedartimber cladding

European Larch or Western red cedartimber cladding

Smooth concrete or render finishSmooth concrete or render finish

Smooth concrete or render finish

Aluminium horizontal cladding

Aluminium horizontal cladding Aluminium horizontal cladding

Timber ventilation louvresTimber ventilation louvres

Timber ventilation louvres Timber ventilation louvres Timber ventilation louvres

7654321

Smooth concrete or render finish

Aluminium horizontal cladding

329000 330000 331000 332000 333000 334000 335000 336000 33700097

1000

9720

0097

3000

9740

0097

5000

9760

0097

7000

LegendPlanning Application redline boundary

Date: 25/01/2013

Datum: OSGB36 Proj: British National GridEPSG Code 27700

MeyGen Tidal Energy ProjectPhase 1

Ordnance Survey data © Crown copyright.Used under licence 1090048504.

0 0.2 0.4 0.6 0.8 1

Kilometres

¯

Produced by:

Ness of Quoys