1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 y e 196 ilable y subdivision PWD BUILDINGS DIVISION, KOZHIKODE Date of Tender Sl.No Name of Project AS No., date & Amount TS No., date & Amount Amount required upto this financial year Remark Period of completion in months Expenditure upto current month Physical progress Stage of Electrification Tender percentage Estimate PAC Agreed PAC PLAN WORKS PROGRESS OF WORKS AS ON 31.01.2017 Budget Provision in Lakhs L.A. Constituency Division Department Budget page No. &Item No. Head of Account Estimate Amount Agreement No. & Date Name of Contractor S.H.O date T.O.C as per Agreement Extended date of completio Actual date of completion Present stage 40590105196 Revenue 1 P.5, 39 47000 Koyilandy KKD Revenue V.O Moodady 405901051 12 Land not ava Koyilandy 2 Vatakara KKD Revenue Construction of new building for Eramala Village office at Orkattery, Vatakara 844300108PWD Deposit 10 Lakhs GO(Rt)No.5363/2014/RD dt. 06.11.2014 for 20L 3995/201516 dt 11.03.2016 for Rs 20 lakhs 24.09.2016 EE(BC)89/201617 dt 26.10.2016 K Anvar 3.95% above ER 1955581 2032827 6 months work started Deposit work Koyilandy 1

Transcript of 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 ... - Kerala PWD

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

y e 1‐96

ilable

ysubd

ivision

PWD BUILDINGS DIVISION, KOZHIKODE

Date of Ten

der

Sl.No

Name of Project 

AS No.,   date & Amou

nt

TS No.,   date & Amou

nt

Amou

nt re

quire

d up

to 

thisfin

ancialyear

Remark

Perio

d of com

pletion in 

mon

ths

Expe

nditu

re upto curren

t  mon

th

Physical progress

Stage of  Electrification

Tend

er percentage

Estim

ate PA

C

Agreed

 PAC

PLAN WORKS ‐  PROGRESS OF WORKS AS ON 31.01.2017Bu

dget Provision

 in Lakhs

L.A. Con

stitu

ency

Division

Dep

artm

ent

Budget page No. &Ite

No.

Head of Accou

nt

Estim

ate Am

ount

Agreem

ent N

o. & Date

Nam

e of Con

tractor

S.H.O date

T.O.C as pe

r Agreemen

t

Extend

ed date of com

pleti o

Actual date of com

pletion

Presen

t stage

4059‐01‐051‐96 Revenue

1

P.5,  39

4700

0

Koyiland

y

KKD

Revenu

e

V.O Moodady

4059

‐01‐05

1

12

Land

 not ava

Koyiland

y

2

Vatakara

KKD

Revenu

e

Construction of new building for Eramala Village 

office at Orkattery, Vatakara

8443

‐00‐10

8‐PW

D De

posit

10 Lakhs

GO(Rt)No.53

63/201

4/RD

 dt. 

06.11.20

14 fo

r 20L

3995

/201

5‐16

 dt 1

1.03

.201

6 for R

s 20 lakhs

24.09.20

16

EE(BC)89

/201

6‐17

 dt 

26.10.20

16

K An

var

3.95

% abo

ve ER

1955

581

2032

827

6 mon

ths

work started

Depo

sit work

Koyiland

y

1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

3

Vatakara

KKD

Revenu

e

Renovation & Construction of 

additional floor to Unnikulam Village 

Office 4059

‐01‐05

1‐96

9.9 Lakhs

Order no. L.R.M

2‐95

94/16

Dated:29

‐03‐20

16   99

0000

1006

/201

6‐20

17  dated

 20

.06.20

16 fo

r 9.9L

work tend

ered

 4 times No 

respon

se.

Koyiland

y

6  a e

Construction of Vill Offi 1‐

72

/201

5/RD

 for 5

0L

16 dt 

s 50 lakhs

16 6‐17

 dt 

16 m e ER

7 7 s d flo

or 

el y

4059‐01‐051‐72 PWD

4

P 68

, 26

Vatakara

KKD

Revenu

e Village Office cum Residential quarters at Thiruvalloor 40

59‐01‐05

50akhs

GO(Rt)No.28

88/

 dt. 4.06

.201

2887

/201

5‐1

28.1.201

6 for R

s

24.06.20

1

EE(BC)58

/201

612

.08.20

1

K P Ibrahi

9.5%

 abo

ve

4729

477

5178

777

9 mon

th

Nearin

g grou

n dsla

b leve

Koyiland

y

5

P 68

, 27

Vatakara

KKD

Revenu

e

Construction of Village Office cum 

Residential quarters at Narippatta 40

59‐01‐05

1‐72

50akhs

GO(Rt)No.28

88/201

5/R

D dt. 4.06.20

15 fo

r 50L

1850

/201

5‐16

 dtd 

3.12

.15 for 4

7500

29.01.20

16

EE(BC)35

/201

6‐17

 dt 

27.06.20

16

Wilson

 Tho

mas

9.99

% abo

ve ER

4214

432

4635

454

9 mon

ths

Sanctio

n in plan for 

slight v

ariatio

n aw

aited from

 District 

collector

Koyiland

y

2

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

6

P 68

, 28

Kunn

amangalam

KKD

Revenu

e

Construction of Village Office cum 

Residential quarters at Olavanna 40

59‐01‐05

1‐72

50akhs

GO(Rt)No.28

88/201

5/RD

 dt. 4.06.20

15 fo

r 50L

2546

/201

5‐16

 dt 

14.01.20

16 fo

r Rs 5

0 lakhs

09.03.20

16

EE(BC)34

/201

6‐17

 dt 

27.06.20

16Pe

ople W

elfare 

Sahakarana

Sangam

Ltd

2% abo

ve ER

4550

324

4641

330

10 m

onths

29.08.20

16

Agreem

ent 

executed

.Work started.

Kozhikod

e

7

P 68

, 28

Perambra

KKD

Revenu

e

Construction of Village Office cum 

Residential quarters at  59

‐01‐05

1‐72

50akhs

No.28

88/201

5/R

.06.20

15 fo

r 50L

9/20

15‐16 dtd 

11.15 for 5

0L

15.01.20

16

C)96

/201

5‐16

 ed

 19.02

.201

6

M.Balakrishn

an

8% below

 ER

4849

518

4641

958

9 mon

ths

ing completion

Koyiland

y

P

Chakkittapara 405

GO(Rt)N

D dt. 4

1699 21.1 1

EE(BC

date

M.M 4.28

Neari

8

P 68

, 29

Perambra

KKD

Revenu

e

Construction of Village Office cum 

Residential quarters at Perambra 40

59‐01‐05

1‐72

50akhs

GO(Rt)No.28

88/201

5/RD

 dt. 4.06

.201

5 for 

50L

2775

/201

5‐16

 dated

 22

.1.201

6 for R

s 50L

11.03.20

16

EE(BC)10

/201

6‐17

 dated 1.6.20

16

M.M

.Balakrishn

an

2.61

% below

 ER

4849

168

4722

605

9 mon

ths

grou

nd floo

r slab 

casted

 

Koyiland

y

9

P.9, 17

2100

0

Koyiland

y

KKD

Registratio

n

Sub.Reg.Off Chemancheri

4059

‐01‐05

1‐95

25

Land

  to be

 iden

tified.

Koyiland

y

4059‐01‐051‐95 Registration

3

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

10

P 10

, 35

3500

0

Kozhikod

e south

KKD

Registratio

n

Reg.Complex, Kozhikkode

4059

‐01‐05

1‐95

80GO (R

t) 

No1

160/08

TD 

dated 06

‐12‐

_ _ _ _

Subm

itted

 for 

revised AS

 for 

400L _

Special B

uildings

11

Nadapuram

KKD

Registratio

n Construction of a building for Sub Registrar Office at Tunery in Tunery Grama Panchayath. 40

59‐01‐05

1‐95

45GO(Rt) No. 

745/20

15/RD 

dated 30

.09.20

15

_ _ _ _

Work started.

_

Koyiland

y

4059‐01‐051‐94 State Excise

12

P.13

, 15

8000

 & 200

0000

Kozhikod

e south

KKD

State Excise

Excise Range Off, Kozhikkode

4059

‐01‐05

1‐94

45

Land

  not available

Subm

itted

 for 

revisedAS

Kozhikod

e

13

1430

000

Koyiland

KKD

PWD 1st and 2nd phase 

of Taluk Hospital, Koyilandi

4059

‐01‐51

‐86

118.7

GORT

No.10

46/20

09/PWD

dt14

‐7‐09 

CE/Blkkd/962

1/20

12dt27

/9/12

for

SE(K)23/20

13‐14 dated 

2110

2013

M/s ULCCS

39% ab0

be

9601

3540

1334

5882

0

30 m

onths

31.10.20

13

30.04.20

16

Work 

Completed

5

8.30

 crores

Special 

Build

ings

14

1386

000

Perambra

KKD

PWD Mini Civil Station, 

Perambra

4059

‐01‐51

‐86

250

GO(RT)No.10

46/200

9/PW

Ddt14‐7‐20

09

103/CE

/BLD

S

3.33

%above   ER

24mon

ths

8.8.20

12

Completed

.

2.24

 Cr

Final bill und

er 

prep

aration

Koyiland

y

4059‐01‐51‐86 Civil works

4

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

15

1386

000

Kozhikod

e North

KKD

PWD Boys Hostel at 

Homeo Medical College at KKD

4059

‐01‐51

‐86

195

GO Rt N

o 10

46/200

9/PW

D dated 

14/07/20

09

‐ ‐ ‐ ‐

subm

itted

 for R

evise

d AS

 for 5

60L

Special B

uildings

16

Kozhikod

e North

KKD

MCC

Setting up of Oncology and Tertiary care centre in Govt. Medical college 40

59‐01‐51

‐86

35 Lakhs

D1/153

88/201

3/M

CC 

Dated 29

‐01‐20

14 

Dr/12/14

‐15 dt 

29.5.14 for 

Rs35

lakhs

E(BC

)25/14

‐15 dt 

24.10.14

K.V.Santho

sh 

Kumar

11.6% below

 E/R

2913

969

2575

949

Work completed

Special B

uildings

K D D E 1 W

17

P.30

6, 28

Kodu

vally

KKD

Gen

eral Edu

catio

n

Infrastructure Development of 

GHSS, Thamarassery

4059

‐01‐51

‐86

140 Lakhs

4781

/201

3/Gl..Edn. 

Dated 

12.11.20

13 

CR/50/13

‐14 

dt.15.02

.201

4 for 

150Lakhs

08.01.20

15

SE(K)24/20

15‐16

Salm

anual Faris

28.92 % abo

ve ER

1405

8586

1812

4330

12 m

onths

20.08.20

15

19.08.20

16

Finishing stage.

85%

Kozhikod

e

18

P.25

, 103

1890

00

Kodu

vally

KKD

PWD Panchayat sub 

centre, Avilora, Kizhakkoth

4059

‐01‐51

‐86

15

GO(Rt)No5

30/201

0/PW

D dt 31‐3‐20

10 fo

r Rs.15

lakhs

CR/14/10

‐11 dt.26.02

.11 for 

17.25 L

25% abo

ve  Estim

ate Ra

te

Work completed

6.14

Kozhikod

e

5

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

19

P.25

, 105

1238

000

Kozhikod

e North

KKD

PWD Multi purpose hall 

at GVHSS, Nadakkavu

4059

‐01‐51

‐86

125 Lakhs

GO(Rt)No 35

9/20

11/PWD 

dt 26‐2‐11

 for R

s125

 lakhs

CR/139

/14‐15

 dt.26.02

.201

1 for R

s.12

5 Lakhs

15.10.20

14

SE(K)53/14

‐15 dt 31.03

.15

ULCCS

24.63%

 abo

ve ER

1171

0038

1459

4221

15 m

onths

31.03.20

15

30.06.20

16

Completed

.

100%

Kozhikod

e

20

P.25

, 106

zhikod

e North

KKD

PWD Building for GHS, 

Karaparamba(Balance Work)

059‐01

‐51‐86

116 Lakhs

t)No3

59/201

1/P

D dt 26‐2‐11

 r R

s116

 lakhs

12‐13 for R

s.11

5 L

K)1/13

‐14 dt 

01.04.13

ULCCS

% abo

ve ER. 

1032

9633

1115

6004

10 M

onths

ork completed

95%

10

Kozhikod

e

Koz

40

GO(Rt

WD

for

CR/7/1

SE( 8 

1

Wo

21

1000

00

Kodu

vally

KKD

PWD

PWD RH, Koduvally

4059

‐01‐51

‐86

93GORt NO 

386/20

11/PWD dated 

28/02/20

11Estim

ate recasted

.AS to 

be accorde

d

Estim

ate subm

itted

 for 

revised AS

Special B

uildings

22

Kozhikod

e North

KKD

Construction of Ladies Toilet block in KGPTC , Kozhikode

4059 30

G.O (R

t) No. 

493/20

15/PWD Da

ted 

30.03.20

15/

2016

/201

5/15

15 dtd 

1.9.20

15 fo

r 31.28

L

Finishing stage.

Kozhikod

e

6

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

23

P 35

, 239

Kunn

amangalam

KKD

Civil w

orks Construction of 

building for at Mini Civil Station at 

Kunnamangalam.

4059

‐01‐51

‐86

400

GO(Rt) No. 125

2/20

14 Dt. 

04.09.14

 for R

s.40

0 L

25/CE/BL/201

3‐14

 Dt.2

3.12

.14 

for R

s.40

0L

16.03.15

SE(K) 5

5/20

15‐16 Dt.07.12

.15

M/s Steel Indu

stria

ls Ke

rala 

Limite

d9.95

% abo

ve ER

3772

9825

4148

3943

18 M

onths

Work in progress 

35%

Special B

uildings

h x 00‐ 

015/ d  7  ER s

4059‐ 01‐051‐ 75‐00‐ 16

24

Kozhikod

e south

KKD

commercial ta

x

SR works to Sale tax complex at 

kozhikode

4059

‐ 01‐05

1‐ 75‐0

16 13.8

G.O.(R

t)No.36

4/2 0

TD

3994

/201

5‐16

 dt

11/03/20

16

24.06.20

16

EE(BC)56

/201

6‐1

Dt.08.08

.16

Jothish

 V R

13.991

% below

 E

1371

442

1179

564

2 mon

ths

Work started

50%

Special B

uildings

25

P.44

, 41

Kozhikod

e south

KKD

Judiciary Centenery 

Memorial Building at Kozhikode Court

4059

‐60‐05

1‐98

1370

GO Rt (No) 

1037

/200

9/Ho

me 

dated 30

‐03‐20

0912

/CE/B&

LW/201

0‐11

dt3‐5‐10

 for 

Rs15

24L

M/s She

riff &

 Co. 

Engg.Con

struction

35% abo

ve estim

ate 

rate

Rs. 110

5963

78 

 Rs. 149

3051

10

Orig

inal 24 mon

ths

28‐05‐20

11

Balance work 

Agreem

ent e

xecuted. 

Work started. 

Retaining wall w

ork 

started

753.5L

Quo

tatio

n by

 ULCCS

Special B

uildings

4059‐60‐051‐98 Judiciary(50% Central Aid)

7

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

26

2000

00

Koyiland

y

KKD

Judiciary

Muncif Court Payyoli

4059

‐60‐05

1‐85

35

Land

 not available

Koyiland

y

27

.50, 20

0000

00

uvam

bady

KKD

Home Fire and Rescue 

stn, Mukkom ‐60‐05

1‐85

220

Home  dated

 .08.20

13/176

1/20

13 

dated 

‐09‐20

140.6.20

13

20/201

5‐16

 20

.07.15

hammed

 Ali, 

irmann

% abo

ve ER

1179

819

9007

880

Mon

ths

07.201

5

8.1.20

17

e completed

. ing work in 

rogress. 

85%

al Buildings

4059‐60‐051‐85 Fire(Defence and control)

P 10

Thiru

H ,40

59‐

214/13

/29

.No.D1

/ d16

‐20

SE(K) 2 Dt.2

A M M

o N36

.96% 21 29 18 

29.

28

Structure

Finishi

pr

Specia

28

P.53

, 20

1500

00

Kodu

vally

KKD

PWD New building for GLPS, Vavad

4059

‐01‐05

1‐71

50GO(Rt)No1

93/201

0/PW

D dt    

      

2‐2‐20

10 fo

r     Rs. 50 lakhs

169/CE

/BL/20

10‐11,date 

17.2.201

1 forR

s:57

50L

3%above ER

. Agreed PA

C Rs. 

5532

418

8 mon

ths from 25.11

.11

20

Balance work to be executed

 by

 PTA

. Previou

s con

tract 

term

inated

10.7

Kozhikod

e

4059‐01‐051‐71

8

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

29

Kozhikod

e North

KKD

DDD

Construction of  DPC Secreteriate 

Building. 

4059

‐01‐05

1

600

No:82

8/20

13/DPL/DD Dt. 

20/04/13

 of ,  D

istrict 

Collector Kozhikode

 for 

42/CE/BL/201

3‐14

 dated

 22

/11/20

13 

forR

s600

L22

.9.201

4

SE(K) 1

5/20

15‐16 Dt.21.05

.15

ULCCS

 Lim

ited

30% abo

ve

Rs. 454

8895

9

Rs.591

3564

8

18 m

onths

28/05/20

15

Structure  com

pleted

. Finishing work in progress

80%

Special B

uildings

30

Kozhikod

e North

KKD Annex to PWD 

Complex05

9‐01

‐051

bmitted

 for 

AS 10 Crore

ecial B

uildings

K 40 Su A

Spe

31

2100

0

Kozhikod

e North

KKD

Govt O

fficers' 

Quarters

Qrts for Gazzetted Officers at Kozhikode

4216

‐01‐10

6‐98

93

Land

 to be 

iden

tified

Kozhikod

e

32

2200

0

Kozhikod

e North

KKD

Govt O

fficers' 

Quarters

Qrts for Govt servants at Kozhikode

4216

‐01‐10

6‐98

126

Land

 to be 

iden

tified

Kozhikod

e

4216‐01‐106‐98 Govt Officers' Quarters Construction

9

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

33

P.75

, 43

2200

0

Kozhikod

e North

KKD

Govt O

fficers' 

QuartersC

onstruction

Working womens Hostel, Kozhikode

4216

‐01‐10

6‐98

460

Land

 to be iden

tified

Kozhikod

e

34

P.75

, 51

2200

0

Kozhikod

e North

KKD

Govt O

fficers' 

Quarters

Transit appartment, Kozhikode

4216

‐01‐10

6‐98

Land

 not available

Kozhikod

e

35

P.78

, 87

2770

00

Vatakara

KKD

Govt O

fficers

Quarters

Qrts for Fire station at Vadakara

4216

‐01‐10

6‐98

290

AS to

 be ob

tained

Koyiland

y

36

P.81

, 7

6580

00

Vatakara

KKD

 Judicial Officers' 

QuartersC

onstruction

MACT Staff qrts at Vadakara

4216

‐01‐70

0‐87

7

Requ

iremen

t to be

 ob

tained

Koyiland

y

4216‐01‐700‐87 Judicial Officers' Quarters Construction

10

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

37

P.81

, 8

3007

000

Kozhikod

e south

KKD

 Judicial Officers' 

Quarters

Judicial officers qrts, Kozhikode

4216

‐01‐70

0‐87

360

Land

 not 

available

Kozhikod

e

38

1880

00

KKD

  Judicial Officers' 

Quarters

Qrts for Vakaf Tribunal judges at 

Kozhikode

4216

‐01‐70

0‐87

35

Land

 to be 

iden

tified

Kozhikod

e

cers' 

s ‐87

osal

39

1880

00

Vatakara

KKD

 Judicial Offic

Quarters

Flat type qrts for Judicial officers at 

Vadakara

4216

‐01‐70

0‐

50.7

Awaitin

g prop

o

Koyiland

y

40

P.30

5,26

Thiru

vambady

KKD

Gen

eral Edu

catio

n

Construction of new building for Govt. Higher Sec. School, Puduppady 

in Kozhikode 4202

‐01‐20

2‐91

200

GO(Rt) No‐ 401

9/20

14/G

.Edn

. Dt. 

08.10.20

14  for 150

L

448/20

15‐16  dtd 10.07

.15 for  16

3L

22.8.201

5

SE(K)98/20

15‐16 dtd 4.03

.16

P.K.Ba

lan

9.65

% abo

ve ER

1511

6043

1657

4740

12 m

onths

10.12.20

15

9.12

.201

6

Work Co

mpleted

.

100%

Kozhikod

e

4202‐01‐202‐91(P) Infrastructure Development Higher Secondary Education

11

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

41

200 Lakhs

Thiru

vambady

Kozhikod

e

Gen

eral Edu

catio

n Construction of Higher Secondary School building for 

Govt. HSS, Neeleswaram, 

Mukkom 4202

‐01‐20

2‐91

(P)

200 Lakhs

G.O.(R

t)No. 176

/201

6/Gl.Edn

 dated 16

.01.16

 

3479

/201

5‐16

 dated

 22

.02.20

16 fo

r Rs 2

00 lakhs

30.03.20

16

SE(K)27/20

16‐17 dtd 

29.06.20

16

Vinay Srinivas

8.19

% below

 ER

1859

0843

1706

8253

15 m

onths

Work in progress

30%

Kozhikod

e

42

303, 10

kode

 North

KKD

l Edu

catio

n

Construction of building for Govt. Higher Secondary 

1‐20

2‐91

(P)

84L

.O.(R

t) 

1/20

13/G

Edn 

2.11

.201

3 for 

2013

‐14 dtd 

.201

4 for  

84L

12.201

4

68/201

4‐15

aprakash

above E/R

6320

7

3077

54

mon

ths

5.20

15

5.20

16

completed

.

100%

zhikod

e

P.3

Kozhik

Gen

era School, East Hill, 

Kozhikode

4202

‐01

G.

No.47

81dated 12

DR/85/2

27.11.

11.1

EE(BC)6

Jaya

42% a 79 113

12 m

18.

17.

Work c 1

Koz

43

Perambra

KKD

Gen

eral Edu

catio

n Construction of Higher Secondary Block for Govt Sanskrit Higher 

Secondary School, Meppayil, Kozhikode 42

02‐01‐20

2‐91

(P)

173L

G.O.(R

t) 

No.32

6/20

16/G

l.Edn

 dated 25

.01.20

16 fo

TS und

er process at 

Circle office

Koyiland

y

44

Kodu

vally

KKD

Gen

eral Edu

catio

n HSE ‐Annual Plan 2015‐16 ‐ Balance 

works of Lab building under XII FC award in GHSS Thamarassery, Kozhikode. 42

02‐01‐20

2‐91

(P)

12L

GO(Rt) No 

973/20

16/G

l Edn

1482

/201

6‐17

dated 

12/07/20

16  for Rs 

12lakhs

30.8.201

6

EE(BC)93

/201

6‐17

 dtd 04

.11.20

16

Santho

sh Kum

ar KV

Item ra

te

1189

050

1008

926

4 mon

ths

Work started

Koyiland

y

12

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

45

Koyiland

y

KKD

Gen

eral Edu

catio

n Annual Plan 2014 ‐15 Construction of First floor for Govt: Mappila Higher 

Secondary School, Koyilandy in Kozhikode Dt. 42

02‐01‐20

2‐91

(P)

75L

G.o 

(Rt)No.40

19/14/Gl.Edn

. Da

ted 08

‐10‐20

1425

13/201

6‐20

17 dated

 9.9.20

16 fo

r Rs 7

5 lakhs

Work started

Koyiland

y

3 outh

catio

n Infrastructure Development ‐  2‐

92

/201

3/Gl. 

13 fo

r 50L

14 dt. 

14 5 6 dated 

5 mu e E/R

1/‐

/‐ hs 5 16 leted

completed

e

4202‐01‐202‐92 Vocational Higher Secondary Education

46

P.30

3, 13

Kozhikod

e s

KKD

Gen

eral Edu

c

Construction of building for VHSS, 

Puthiyara in Kozhikode 42

02‐01‐20

50L

GO(Rt) No. 458

3/Edn. dt. 30

.10.20

DR/83/20

13‐

24.01.20

1

8.1.20

15

EE(BC)44

/15‐16

19.11.15

M.Kuh

am

26.6% abo

ve

4799

9941

6076

792

9 mon

t h

20.11.15

19.08.20

1

Work compl

100%

Foun

datio

n work 

Kozhikod

47

P.29

5, 83

Kozhikod

e South

Kozhikod

e

PWD

Additional block for class rooms to GHSS Medical college campus Plus Two annex, 

Chevayur Kozhikkode

4202

‐01‐20

2‐99

 

200 Lakhs

GO(RT) No‐ 

241/20

12/PWD dated   

16‐2‐201

2 for 2

00L

15/CE/BLDS

/201

2‐13

 dated 04

.05.20

12 fo

r Rs. 

212L

SE(K) 7

/201

3‐20

14 dt 

02.05.20

13

P.V. Biju, 

12.49 above ER

Rs 165

,15,69

8/‐

Rs 185

,78,50

9/‐

16 M

onths

03.05.20

13

02.09.20

14

Work 

completed

100%

Rs.139

0470

6/‐

Rs. 75 lakhs

Work 

completed

Kozhikod

e

4202‐01‐202‐99 Secondary school Buildings (Plan‐Major Works)

13

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

48

P.25

, 108

1238

000

Kozhikod

e North

KKD

PWD Multi purpose hall 

at GHSS, Karaparamba

4202

‐01‐20

2‐99

181 Lakhs

GO(Rt)No. 359

/201

1/PW

Ddt 26‐2‐11

 for  Rs52

8 lakhs

Reg.No.31

81/201

5‐16

 dated

 09

‐02‐20

16 dated

 9.02.20

16 

forR

s181

L27

.02.20

16

SE(K)100

/201

5‐16

 dated

 4.03

.201

6M/s. A

nsam

 India 

Constructio

n&De

velope

rs10

.193

% below

 ER

1693

0194

1520

4607

12 m

onths

14.03.20

16

13.03.20

17

Work in progress

15%

Kozhikod

e

49    

zhikod

e North

KKD

eral Edu

catio

n

Construction of building for GHSS Kunduparamba 

Kozhikode 

150 L

(Rt)97

3/20

16/

l.Edn

 dated

 03

.03.20

16

     

ndrance free. 

Land

 to be 

obtained

Kozhikod

e

Koz

Gen

Kozhikode

GO( G 0

Hin L

50

Kozhikod

e

KKD

Gen

eral Edu

catio

n Construction of building for Government 

Ganapath HSS at Kallai in Kozhikode 

District. 4202

‐01‐20

2‐91

200 Lakhs

GO(Rt)No.17

6/20

16/G

l.Edn

 dated

 16.01

.201

6 For 2

00 Lakhs

Estim

ation un

der 

prep

aration 

Kozhikod

e

51

P.30

5, 27

Kozhikod

e South

Kozhikod

e

Gen

eral Edu

catio

n Construction Of School Building for 

Government Achuthan Girls 

Higher Secondary School (2014‐15), Chalappuram,In 

200 Lakhs

GO(Rt)No.15

2/20

15/G

l.Edn

 dated

 13

.01.20

15

TS issued

. Work to be 

tend

ered

.

Kozhikod

e

14

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

52Ko

zhikod

e South

Kozhikod

e

Gen

eral Edu

catio

n

Construction Of School Building for 

Government Achuthan Girls 

Higher Secondary School (2015‐16), Chalappuram,In Kozhikode District

200 Lakhs

Estim

ate subm

itted

 for 

A.S.

Estim

atfor R

s.20

0 L 

subm

itted

forA

S.Ko

zhikod

e

53 26, 3

akara

KKD

Education

Construction of Seminar Complex 

t M d ll 1‐20

3‐99

Lakhs

673/20

13/ 

05.08.13

 for 

50L

te und

er 

aration.

iland

y

4202‐01‐203‐99 Higher Education

P.3

Vat K

Higher E at Madappally 

College

4202

‐0

150 

GO(Rt)16

H.Edn. dt. 0 1

Estim

atprep

a

Koy

54

Vatakara

KKD

GBA

S

Construction of Building for 

Gender friendly toilet at 

Government College, 

Madappally

4202

‐01‐20

3‐99

10 Lakhs

No.CE

/BL/GBA

S/12478

(5/201

1) 

dt. 26.03

.201

2 for 1

0L

Quo

tatio

n to be 

invited.

Koyiland

y

55

P.30

9, 26

Vatakara

KKD

Construction of Ladies Hostel to Govt.College 

Madappally under UGC Co

mpleted

.

50.00 Lakhs

Koyiland

y

15

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

56

P.32

2, 47

Kuttiady

KKD

Higher Edu

catio

n

Construction of Compound wall for 

Govt College, Mokeri 

4202

‐01‐20

3‐99

20 Lakhs

GO(Rt)No.97

8/20

13 H. Edn

 dtd

 31.05

.201

3  fo

No respon

se to

 Quo

tatio

n. 

N.Quo

tatio

n to be 

invited

Koyiland

y

57

P.31

5, 111

1390

00

Kozhikod

e North

KKD

Higher Edu

catio

n

Three classrooms at the first floor of the existing block 

at Govt Law college, KKD 42

02‐01‐20

3‐99

95GO(Rt) No‐

1044

/12/He

dn dt 

2‐6‐20

12DR

/36/13

‐14 01

‐07

‐13 for 9

5 L

29.01.20

14

EE(BC)30

/201

4‐15

 dated 04

‐11‐20

14

Udayakumar

24.57%

 abo

ve E/R

Rs. 812

1162

/‐

Rs. 101

1653

2/‐

12 m

onths

20.11.20

14

19.11.15

7.08

.15

nil

Work completed

.

100%

Kozhikod

e

d. 

2608

t  r

58

Kozhikod

e North

KKD

Higher Edu

catio

n

Tiling of class room, auditorium, ground floor of library in Govt. Law College Kozhikode 42

02‐01‐20

3‐99

25G.O(Rt) No. 

1484

/201

3/H.Edn dtd

Tvm. 12‐07

‐201

3

KKD/20

15‐201

6/20

15/ 2

16.10.20

15

EE(BC)68

/201

5‐16

 dt

26.12.15

K.V. Santhosh Ku

mar

21.30%

 below

 E/R

2623

660

2064

820

6 mon

ths

26.12.20

15

25.05.20

16

Work completed

100%

Kozhikod

e

59

Kozhikod

e North

KKD

Higher Edu

catio

n

Sheet roofing of the two hostels in Law College Kozhikode

4202

‐01‐20

3‐99

6

G.O(Rt) No. 148

4/20

13/H.Edn

 dtd. Tvm

. 12‐07

‐201

3

891/20

15‐201

6 dtd 20

.8.15 for 

6.9L

21.01.20

16

EE(BC)94

/201

5‐16

 dt 1

9.02

.16

K.V. Santhosh Ku

mar

10% abo

ve ER

6882

75

7571

02

3 Mon

ths

29.02.20

16

28.05.20

16

Work completed

.

100%

Kozhikod

e

16

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

60

Kozhikod

e North

KKD

Higher Edu

catio

n

Govt.Physical Education College ‐ Infrastructure development‐ construction of BPE and BPEd class rooms and Well

4202

‐01‐20

3‐99

100

G.O(Rt) No. 263

4/20

14/H.Edn

 dtd. Tvm

. 05‐11

‐201

4

2073

/15‐16

 dt 1

5.12

.15 for 

Rs 100

L

4.02

.201

6

EE(BC)10

3/20

15‐16 dt 

04.03.16

Dine

shan

 A K

0.01

% below

 ER 

9698

019

9697

049

10 M

onths

14.03.20

16

13.01.20

17

Finishing stage.

95%

Kozhikod

e

00 North

catio

n

Govt. Law College Kozhikode ‐

Construction of classrooms and 03

‐99

11/201

5/ 

3.05

.15 for 

7 dated 

Bldgs for Rs 

hs 6 d 30

.09.20

16

er te 03 94 hs ogress

de

61  

1000

000

Kozhikod

e N

KKD

Higher Edu

c classrooms and staff room on 

second floor and Examination Hall on third floor of the new block.

4202

‐01‐20

300L

GO( R

T)No. 10 1

H.Edn.dtd  Tvm

 13

300L

1372

/201

6‐17

06.07.20

16 of C

E, 

300lakh

12.8.16

SE(K)40/16

‐17 date

K Sakee

Item ra

t

2462

880

2200

269

9 mon

th

Work in pro

Kozhikod

62

P.31

8, 135

 

Kozhikod

e North

KKD

Higher Edu

catio

n

Extension of Library Block‐Govt 

Law college Kozhikode

4202

‐01‐20

3‐99

400 L

G.O(Rt.) No. 173

6/20

14/ 

H.Edn. Dated

 23‐07

‐201

4

     

Plan

 to be fin

alise

d

Kozhikod

e

17

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

63    

Kozhikod

e North

KKD

Higher Edu

catio

n HED‐Annual Plan 2013‐14‐ Govt Law College Kozhikode ‐ 

 Annual maintenance of the main building 42

02‐01‐20

3‐99

10 L

G.O(Rt.) No. 148

4/20

13/ 

H.Edn. Dated

 12‐07

‐201

3

782/20

16‐17 dated 9.06

.201

6 for R

s 10 lakhs

01.07.20

16

EE(BC)/46/20

16‐17 dated 

01.08.20

16 

K.V. Santhosh Ku

mar

25% below

 ER

9922

82

7494

61

3 Mon

ths

Finishing stage.

Kozhikod

e

orth

ation

HED‐Annual Plan 3‐99

013/ H.Edn

. 20

13

.06.20

16 fo

r s 16 17 dated

 16

 

w ER

4 9 s letio

n

e

64    

Kozhikod

e N

KKD

Higher Edu

ca 2013‐14‐ Govt Law College Kozhikode ‐ 

 Extension of Computer Lab 42

02‐01‐20

3

15 L

G.O(Rt.) No. 148

4/20

Dated 12

‐07‐

781/20

16‐17 dated 9

Rs 15lakh

01.07.20

1

EE(BC)/44/20

16‐1

27.07.20

1

P. Reji

14.25%

 below

1247

784

1070

599

3 Mon

ths

Nearin

g comp

Kozhikod

e

65

Kuttiady

KKD

Construction of building for 

Anganvadi (Center No.146)at Kuttiady 

Panchayath

4235

‐02‐10

2‐94

(P)

8 Lakhs

GO(Rt) No.99

/201

4/SW

D Dt.11.02

.201

4 for 8

 Lakhs

DR/27/14

‐15 Dt.05/08

/201

4

01.11.20

14

NO.EE(BC

)15‐16

 Dt 2

6/06/2015

K.P.Ibrahim

25% abo

ve ER

7816

69/‐

9770

86/‐

4 Mon

ths

02.07.2015

01.11.2015

Work completed

.

Koyiland

y

4235‐02‐102‐94(P)

18

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

66Ku

ttiady

KKD

Construction of building for 

Anganvadi (Center No.161)at Velam 

Panchayath

4235

‐02‐10

2‐94

(P)

8 Lakhs

GO(Rt) 

No.99

/201

4/SW

D Dt.11.02

.201

4 for 8

 DR

/28/14

‐15 

Dt.05/08

/201

4

EE(BC)32

‐201

4‐15

 Dt.05.11

.201

4

K.P.Ibrahim

Estim

ate Ra

te

7816

69/‐

7816

69/‐

4 Mon

ths

06.11.2014

05.03.2015

Work Co

mpleted

.

Koyiland

y

67 ambra

KKD

Education

Construction of a building for 

Women's Hostel at CKGM Govt.  20

3‐89

 PWD

0 Lakhs

4/20

11/H.Edn

. 20

12 fo

r 150

L

ted for T

.S.

yiland

y

4202‐01‐203‐89 Building construction for Colleges and Hostels 

Pera K

Higher 

College, Perambra in Kozhikode 

District 4202

‐01‐2

150

GO(Rt)15

04 dt. 20

.09.2

Subm

itt Koy

68

P.32

4,4

Perambra

KKD

Higher Edu

catio

n

Construction of Compound wall for 

CKGM Govt College Perambra

4202

‐01‐20

3‐96

20 Lakhs

GO(Rt)No.97

8/20

13 

H. Edn

 dtd  

31.5.201

3  fo

r 20L

Revalidation of AS 

need

ed

Koyiland

y

4202‐01‐203‐96 Building construction for Colleges and Hostels  (RIDF )

19

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

69

Kuttiady

KKD

GBA

S

Construction of Building for 

Gender friendly toilet block of 

Mokeri Government 

College, Mokeri

4202

‐01‐20

3‐96

10 Lakhs

No.CE

/BL/GBA

S/ 

1247

8(5/20

11) d

t. 26

.03.20

12 fo

r 10L

D4/261

0/12

 dt.0

8.10

.12 

Rs.10 Lakhs

AS to

 be revalidated

Quo

tatio

n to be invited.

Koyiland

y

70

P.32

4,5

Perambra

KKD

Higher Edu

catio

n

Construction of Seminar Hall  for CKGM Govt 

College Perambra23

5‐02

‐102

‐94(P)

60 Lakhs

GO(Rt) 

No.52

7/20

13 H. 

Edn dtd 

DR/86/20

13‐14  

td.27.01

.14          

Rs60

Lakh

27/5/201

4

E(BC

)33/20

14‐15 

dtd 05

.11.14

Sri.P.Abd

u Nasar

5% abo

ve E/R

Rs.510

3521

/‐

Rs.535

8697

/‐

9 mon

ths

11.10.20

14

10.07.20

15

9.11

.15

5.10

.15

Work completed

.

40.56 Lakhs

14.00 Lakhs

Koyiland

y

H 42 D dt EE S W

71 KKD

Building constructi o

Ladies waitng shed for Govt College, 

KKD

4202

‐01‐20

3‐96

15

RC estim

ate 

subm

itted

 for A

.S.

Kozhikod

e

72 KKD

Building constructio

n

Principal and staff qtrs for Govt College, KKD

4202

‐01‐20

3‐96

57

RC estim

ate 

subm

itted

 for A

.S.

Kozhikod

e

73 KKD

Building constructi

Comp. wall for Govt College, KKD

4202

‐01‐20

3‐96

25

RC estim

ate 

subm

itted

 for A

.S.

Kozhikod

e

20

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

74

P.32

2,46

Kuttiady

KKD

Building constructio

New Block for Govt College, Mokeri

4202

‐01‐20

3‐96

120

RC estim

ate 

subm

itted

 for A

.S.

Koyiland

y

75

P.32

2,48

Thiru

vambady

KKD

Building constructio

Principal qtrs at Govt College, Kodencheri

4202

‐01‐20

3‐96

20

RC estim

ate 

subm

itted

 for A

.S.

Kozhikod

e

dy uctio

n

96 A.S.

76

P.32

2,49

Thiru

vambad

KKD

Building constru

Teachers qtrs at Govt College, Kodencheri

4202

‐01‐20

3‐9

30

RC estim

ate 

subm

itted

 for  A

Kozhikod

e

77

P.32

2,50

Thiru

vambady

KKD

Building constructio

Staff qtrs at Govt College, Kodencheri

4202

‐01‐20

3‐96

240

RC estim

ate 

subm

itted

 for A

.S.

Kozhikod

e

21

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

78

Thiru

vambady

Kozhikod

e

Higher Edu

catio

n

Integrated renovationof 

Administrative and Academic Block at 

Govt.College Kodenchery, Kozhikode

4202

‐01‐20

3‐96

150 Lakhs

G.O (R

t.) No. 209

9/14

/H.Edn

/201

5‐20

16/201

5/28

4 dtd 

28.9.15 for 1

50L

11.11.20

15

SE(K)54/20

15‐16 dt 04.12

.201

5

K.V.Santho

sh Kum

ar

11.3% below

 ER

1448

2428

1284

5913

9 mon

ths

14.12.20

15

13.09.20

16

Nil

Work Co

mpleted

..

100%

Kozhikod

e

ady

e ation

Construction of b ildi f ‐7

5(P)

hs /201

3 ‐ H

. .201

3 for 

hs dated 

6475

097

6 16 dtd 

16 V.J

w E/R

3 7 hs 16 17 gress.

e

79

Thiru

vamba

Kozhikod

Higher Edu

c a new building for Ladies Hostel at Govt. College, Kodenchery

2202

‐03‐10

3‐

150 Lakh

G. O

(Rt.) No. 241

/Edn, dated

 18.02

.15

0 Lakh

815/20

15‐16 d

31.07.20

15 fo

r 6

20.01.16

SE(K)78/20

15‐

08.02.20

1

Sebastian V

8.89

% below

1585

788

1444

811

12 m

ont h

18.02.20

1

17.02.20

1

Work in prog

50%

Kozhikod

e

80

Vatakara

KKD

HRD

IHRD Model Poly, Vatakara ‐ 

Construction of Ladies Hostel

4202

‐01‐20

3‐96

100 Lakhs

CH/204

2/HR

D dt. 09.04

.12 for 

100L

Estim

ate  und

er 

prep

aration. Full 

depo

sit not 

received

.

1183

84/‐Soil test

Koyiland

y

81

Vatakara

KKD

Higher Edu

catio

n IHRD Model Poly, Vatakara ‐ 

Construction of balance portion of First floor of main 

building

2203

‐00‐11

2‐98

‐17 MW

66 lakhs

GO(Rt)No.24

46/201

5 H. 

Edn dtd 18

.09.20

15  for 

66L 

3189

/201

5‐16

 dated

 09

.02.20

16 fo

r Rs 6

6 lakhs

06.08.20

16

EE(BC)72

/201

6‐17

 dated

 09

.09.20

16

K.P. Chand

ran

11.1% below

 ER

6170

123

5485

239

9 mon

ths

Work started

Koyiland

y

22

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

82

Kozhikod

e south

KKD

Higher Edu

catio

n Govt Arts & Science College, Kozhikode‐ 

Construction of Golden Jubilee PG 

Block 4202

‐01‐20

3‐83

1200

lakhs

G.O.(R

t)No.51

60/201

5/H.Edn. Dtd Tvm

 31

.12.15

Tend

er app

roved at 

5.34

% below

 ER. 

Agreem

ent to be

 executed

Special B

uildings

ols ‐ 

4202‐02‐103‐99 Technical High Schools ‐ Civil Works

4202‐01‐203‐83 College Infrastructure Upgradation Programme

83

P.26

6, 8

4470

00

Koyiland

y

KKD

Technical H

igh Scho

oCivilW

orks

Building for THS, Payyoli

4202

‐02‐10

3‐99

151.62

AS estim

ate to be

subm

itted

.

Koyiland

y

84

Vatakara

KKD

DTE

Govt. Technical High School, 

Vatakara ‐ Special repairs to school 

building   4202

‐02‐10

3‐99

25

D4/367

8/15

/DTE

1700

/201

5‐20

16 dtd 

21.11.15

 for 2

5L

29.1.16

EE(BC)10

0/20

15‐16 dt 

29.02.20

16

ULCCS

 

Estim

ate Ra

te

2494

447

2494

447

6 mon

ths

Work completed

.

Koyiland

y

23

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

85

Vatakara

KKD

DTE

Infrastructural Devpt 2016‐17‐ Providing Sheet Roofing and false 

ceiling for workshop building Govt. Technical High School, Vatakara 

4202

‐02‐10

3‐99

21.25

D4/151

64/16/DT

E Pu

rchase 

Section dated Tvm 08.06

.201

6

K.V.Santho

sh Kum

ar

Selection Notice is to be 

issue

d.

Koyiland

y

North Govt Technical 

High School 03‐99

TE Purchase 

m 31.03

.201

6

7 dated 

Rs 26 lakhs

16 ‐17 dated 

016  Kum

ar

ow ER

42 12 hs ted. W

ork to 

ed.

de

86

Kozhikod

e N

KKD

DTE

High School, Kozhikode ‐ 

Construction of Compound Wall 42

02‐02‐10

26

D4/416

47/15/DT

Section dated Tvm

&80

/201

6‐17

09.06.20

16 fo

r R

1.07

.201

EE(BC)47

/201

6‐01

.08.20

K.V.Santho

sh

16.1% belo

2598

94

2180

51

4 Mon

th

Agreem

ent e

xecut

be starte

Kozhikod

87

P.19

, 151

Kozhikod

e North

KKD

Technical Edu

catio

n Construction of class room block. New block building Phase I in KGPT, 

West Hill, Kozhikode 42

02‐02‐10

4‐94

49.70 Lakhs

D4/326

47/13 dt.30.09

.13 of 

T.Edn for 

Rs.49.70

 Lakhs

DR/76/13

‐14 dt.26.12

.13 for  

Rs.49.70

 Lakhs

18.3.201

4

EE(BC)10

7/20

15‐16 

dated 19

‐05‐20

15

Abdu

l Sam

ad

25% abo

ve Estim

ate rate

Rs. 48,99

,257

/‐

Rs.61,24

,071

/‐

8 mon

ths

07.11.20

14

06.07.20

15

Work completed

.

100%

Kozhikod

e

4202‐02‐104‐94 Polytechnic Buildings ‐ Civil Works

24

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

88

P.35

2, 1

Kozhikod

e North

KKD

Higher Edu

catio

n

Construction of additional block in  KGPT, West Hill, 

Kozhikode

4202

‐02‐10

4‐94

99.7

GO(Rt) No.14

89/13 H.Edn. 

dt.15.07

.13 for 9

9.77

 L

DR/79/13

‐14 09

‐01‐20

14 fo

r 99

.77 L

EE(BC)61

/201

4 dated 09

‐02‐

2015

A.K. Dinesan

25.01%

 abo

ve E/R

Rs.970

9615

/‐

Rs.121

3799

0/‐

19‐02‐20

15

Work completed

.

Kozhikod

e

89

348, 117

 

kode

 North

KKD

r Edu

catio

n

Construction of class room for new 

block phase II 

200 L

G.O(Rt) No. 

014/H.Edn 

23/07/20

14

     

tend

ered

. ion no

tice 

ssue

d.

zhikod

e

P.3

Kozhik

Higher

block phase II KGPT Kozhikode

2AS

 No. G

808/20

dated 2

Work 

Select i s

Koz

90    

Kozhikod

e North

KKD

PWD Construction of  

ladies toilet block in KGPT Kozhikode

4059

‐01‐05

1‐79

30 L

G.O (R

t) No. 

493/20

15/PWD Da

ted 

30.03.20

1595

1/20

15‐16 dtd 

01.09.20

15 fo

r Rs31.28

L

9.10

.201

5

EE(bC)93

/201

5‐16

 dtd 

19.02.20

16

Santho

sh Kum

ar KV

9.30

% abo

ve ER

2862

156

3128

336

9 mon

ths

29.02.20

16

28.11.20

16

Work fin

ishing stage.

Kozhikod

e

91

P.34

6, 91

2123

000

Kozhikod

e North

KKD

Higher Edu

catio

n

Ladies Hostel at GPT, Kozhikkode

4202

‐02‐10

4‐99

10GO(Rt) NO‐ 

1922

/201

0/He

dn  dt 4

‐10

‐201

0

SE(K)8/12‐13

 dt 2

0.4.12

M.Premarajan

3.33

% below

 E/R

1066

5199

/‐

1031

0048

/‐

Work stop

ped du

e to 

objection from

 Defen

ce.

Kozhikod

e

25

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

92    

Kozhikod

e North

KKD

DTE

Construction of compound wall 

Womens Polytechnic college 

Kozhikode 4202

‐02‐10

4‐99

26 L

Proceeding

 No. 

D4/499

5/15

/DTE

 dated

 Tvm 16‐05

‐201

5 for 2

6 l

1688

/201

5‐16

 dt 2

1.11

.15 

for 2

7.1L

4.02

.201

6

EE(BC)10

2/20

15‐16 dated 

3.03

.201

M.K.Kun

hammu

3.3%

 abo

ve ER

2708

708

2798

095

5 mon

ths

14.03.20

16

13.08.20

16

Work completed

.

100%

Kozhikod

e

93    

kode

 North

KKD

r Edu

catio

n

Construction of New Academic block Womens  02

‐104

‐99

200L

(Rt)No. 

5/H.Edn dated 

‐201

5 for 2

00 L

015‐20

16dtd 

16 fo

r 220

L

01.201

6

015‐16

 dated

 02

.201

6 n Co

nstructio

ns 

Interio

rs% below

 ER

3799

75

2346

25

mon

ths

02.201

6

08.201

7

good

 progress

75%

zhikod

e

Kozhik

Higher polytechnic college 

Kozhikode 4202

‐0 2GO(

1084

/201

5Tvm 19‐05

‐22

83/20

1.1.20

1

16.0

SE(K)83/2

11. 0

M/s Hascon

and

0.75

% 193

192

18 m

19.0

18.0

Work in g 7

Koz

94

P.35

32, 12

4000

Kozhikod

e North

KKD

Engine

ering colleges, 

TechnicalColleges

Computer Block for Eng.College, 

Kozhikode

4202

‐02‐10

5‐99

70

Land

 not available

Special B

uildings

95

P.35

4, 21

6070

00

Kozhikod

e North

KKD

Higher Edu

catio

n

Work shop for Engg. College, KKD

4202

‐02‐10

5‐99

205

GO Rt N

o 97

3/20

12/H.Edn

 dated 28

‐05‐20

12

‐ ‐ ‐

Land

 not available.

Special B

uildings

4202‐02‐105‐99 Engineering colleges, Technical Colleges and Other Institutions

26

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

96

P.35

4, 22

4000

Kozhikod

e North

KKD

Engine

ering colleges, 

TechnicalCollegesa

nd

Boys Hostel for Engg. College, KKD

4202

‐02‐10

5‐99

125

Land

 not available

Special B

uildings

97

P.35

4, 24

3900

0

zhikod

e North

KKD

her E

ducatio

n

Staff Qrts for Engg. College, KKD

02‐02‐10

5‐99

100

GO Rt N

o 4/20

12/H.Edn

ed 16‐05

‐201

2

rom Defen

ce  to 

be obtaine

d

ecial B

uildings

Koz

High

420

904

 date

NOC fr b

Spe

98

P.35

7, 68

1386

000

Kozhikod

e North

KKD

PWD Civil Block for Engg 

College, KKD

4202

‐02‐10

5‐99

175

GO(Rt) 

No1

046/20

09/PWD 

dated 14

‐07‐20

09CR

/8/12‐13

dt 29‐9‐

12 fo

r Rs.20

1.25

L

8.11

.201

2

SE(K)44/12

‐!3 dt 29‐

9‐12

 

K.M Abd

ul Kareem

7.9%

 abo

ve 

estim

aterate,

Rs16

1255

86/‐ 

Rs17

3995

07/‐

15 m

onths

12‐07‐20

12

Work completed

.

72.47

Special B

uildings

27

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

99

P.28

4, 93

4000

Kozhikod

e North

KKD

Higher Edu

catio

n Computer Blockand 

administrative block for 

Eng.College, Kozhikode 42

02‐02‐10

5‐99

472

GO(Rt) No2

241/20

10/H.Edn

 Dated

 24

/11/20

16

Existing canteen bu

ilding to be 

demolish

ed

Special B

uildings

100

P.28

4, 93

4000

Kozhikod

e North

KKD

Higher Edu

catio

n

Administrative block for 

engineering college kozhikode

4202

‐02‐10

5‐99

1230

GO( R

t) No 25

32/201

4/H Edn dt 

25/10/20

14

Returned

 to AE for correction by

CE.NOC from

 defen

se to

 be 

obtained

Special B

uildings

28

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

101

P.35

7, 71

4000

Kozhikod

e North

KKD

Higher Edu

catio

nMech Engg 

production lab for Engg College, KKD

4202

‐02‐10

5‐99

157

GO(Rt) No2

241/20

10/H.Edn

 Dated

 24

/11/20

10

Reg. No.51

/201

3‐14

 dated

 25.02

.201

4 of 

SE(B) N

C, KKD

 for 1

8055

000/‐

23.09.20

15

SE(K)19/20

16‐17 dated 7.06

.201

6

A K Dine

san

26.21%

 abo

ve ER

1598

0540

2016

9040

15 m

onths

Work started.

Special B

uildings

ildi i il k

102

Kozhikod

e North

KKD

PWD

Construction of workshop and lab building at Govt ITI   

 Kozhikode.

4202

‐02‐80

0‐95

250 Lakhs

GO (R

t) No 

1812

/14/PW

D  dtd  

31/12/20

14  250

 N.41/CE

/BLD

S/20

13‐

14 dated

 5‐2‐201

1 for 

250L

SE(K)51/20

14‐15 

dated 30

‐3‐201

5

Abdu

l Rashe

ed T

35% abo

ve E/R

Rs. 263

5365

5/‐

Rs 355

7743

5

18 m

onths

29.4.201

5

28.9.201

6

Work completed

.

100%

48.95L

Special B

uildings

103

P.36

6, 44

1970

00

Beypore

KKD Building for ITI, 

Beypore

4202

‐02‐80

0‐95

215 L

GO(Rt) 128

8/20

14/LBR

 dated

 18

.09.20

14 Rs.21

5L

Land

 to be hand

ed over. Soil 

investigation carried ou

t.

Soil investigation work  carrie

d ou

tKo

zhikod

e

4202‐02‐800‐95 ITI Buildings ‐ Civil Works

29

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

104

P.36

6, 45

1970

00

Nadapuram

KKD Building for ITI, 

Valayam

4202

‐02‐80

0‐95

Land

 not available

Koyiland

y

105

P.36

6, 53

1477

8000

Kozhikod

e North

KKD

LBR Trainees Hostel at 

ITI, Kozhikode

4202

‐02‐80

0‐95

150

GO(Rt) No‐

1967

/201

2/LBR dt 

19‐12‐20

12

Civil w

ork 

completed

.

Special B

uildings

106

P.38

1, 27

Kuttiady

KKD Qrts for Govt 

Hospital, Kuttiyadi

4210

‐01‐11

0‐93 26

A.S. to

 be 

accorded

Koyiland

y

107

P.31

4,92

Kuttiady

KKD

Construction of additional floor to administrative cum academic block at 

Mokeri Govt.college Mokery.

2202

‐03‐10

3‐68

‐01 CQ

IP

75 Lakhs

Go(Rt)No.84

6/14

/  H.Edn    Dt02

.05.14

1881

/201

5‐16

 dt 

04.12.20

15 fo

r Rs 7

5 lakhs

29.01.20

16

EE(BC)12

/201

6‐17

 dated

 2/06

/201

6

Sri.V

.C.Eldo

4.6%

 abo

ve ER

7481

194

7825

329

12 m

onths

Work in progress.

80%

Koyiland

y

4210‐Medical and Public health  4210‐01‐110‐93 Allopathy

2202‐03‐103‐68‐01 CQIP 

30

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

108

P.31

4,93

Perambra

KKD

CQIP 2014‐15 Construction of an additional floor to the PG Block at CKGM College ,Perambra

2202

‐03‐10

3‐68

‐01 CQ

IP

75 Lakhs

Go(Rt)No.84

6/14

/H.Edn

 Dt.02.05

.14

1140

/201

5‐16

 d td

 16

.9.201

5

09.10.20

15

EE(BC)56

/201

5‐16

 Dt.28.11

.15

Sri.V

.C.Eldo

1.6%

 below

Rs.719

7919

Rs.708

2752

10 m

onths

5.12

.15

4.10

.201

6

Work ne

aring completion.

95%

Koyiland

y

109

Perambra

KKD

Maintenance work of main building at CKGM college Perambra 3‐

103‐68

‐01 CQ

IP

25 Lakhs

No.84

6/14

/H.Edn

 Dt.02.05

.14

6/20

15‐16 dtd 

11.9.201

5

09.10.20

15

BC)54/20

15‐16 

Dt.28.11

.15

N.M

usthafa

1% below

 ER

2499

694

2272

222

4 Mon

ths

5.12

.15

4.4.20

16

rk com

pleted

.

Koyiland

y

Perambra22

02‐03

Go(Rt)N D

1086 0

EE(B D N 9.1

Wo

110

Kuttiady

KKD

Tiling floors to the depatments and pathway to the 

newly constructed block of the Govt.College, 

Mokeri 2202

‐03‐10

3‐75

‐01 

8 Lakhs

P‐2‐21

489/20

14/Coll.Edn

 dated 21

.6.201

3614

/201

5‐16

 dated

 26

.02.20

16 fo

r Rs 8

 lakhs

14.03.20

16

EE(BC)31

/201

6‐17

 dated

 20

.6.201

6

Jayaram V R

17.99%

 below

 ER

7995

80

6557

35

3 Mon

ths

Work completed

.

Koyiland

y

2202‐03‐103‐75‐01 Colleges 

31

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

111

Perambra

KKD

CIUP‐CKGM Govt.College Perambra 

Renovation of Boys &Girls room 

,Badminton court and tiling of two 

class rooms

2202

‐03‐10

3‐75

‐01 

8 Lakhs

P‐2‐22

089/20

15/Coll.Edn

Work tend

ered

Koyiland

y

112 84, 4

ode North

KD

Improvement works Ph‐1 to 

d l 1‐11

0‐92

to be 

orde

d

Build

ings

4210‐01‐110‐92 Allopathy‐ Mental Hospital

112

P.38

Kozhiko K wards at Mental 

Hospital, KKD

4210

‐01

A.S. 

acc o

Special 

113

P.38

4, 5

Kozhikod

e North

KKD

Improvement works Ph‐2 to 

wards at Mental Hospital, KKD 42

10‐01‐11

0‐92

A.S. to

 be 

accorded

Special B

uildings

114

P.38

4, 6

Kozhikod

e North

KKD

Paywards to wards at Mental Hospital, 

KKD

4210

‐01‐11

0‐92

Work completed

.

Special B

uildings

32

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

115

Kozhikod

e North

KKD

Health and

 Fam

ily 

Welfare

Construction of building for X‐ray and ECG at Govt. Mental Health 

Centre, Kozhikode 4210

‐01‐11

0‐92

60GO(Rt) No. 

4064

/201

3/H&

FWD 

dt.Tvm

 06.12

.201

3 for 

918/20

15‐16 

dtd.25

.08.15

 for 

Rs59

9279

020

.11.15

K.V.Santho

sh Kum

ar

10% abo

ve E/R

5871

579

6458

737

9 mon

ths

Kept in

 abe

yance based 

on  req

uest of h

ospital 

authorities.As p

er m

aster 

plan: w

ork to be 

cancelled. 

25 Lakhs

Work aw

arde

d to 

K.V.Santho

shKu

mar

Special B

uildings

116

zhikod

e North

KKD

lth and

 Fam

ily 

Welfare

Construction of Forensic Ward at Mental Health 

Centre Kozhikode ‐01‐11

0‐92

(Plan)

126 Lakhs

GO(Rt) No. 

2013

/H&FW

D dt. 

1.20

13 fo

r 126

LKK

D/20

15‐

/201

5/21

66 dtd 

115

for1

368L

n abeyance based

 qu

est o

f hospital 

authorities 

Building to be 

demolish

edecial B

uildings

Koz

Hea Centre, Kozhikode

4210

‐ G38

23/2

16.11

2016

/28

1

Kept in

on  req a

Ex.B d

Spe

117

Kozhikod

e North

KKD

Health and

 Fam

ily 

Welfare

Construction of Modern 

Physhiatric Ward at Govt Mental Health centre, Kozhikode

4210

‐01‐11

0‐74

(Plan)

400

GO(Rt) 298

0/20

14/ 

H&FW

D dt.30.08

.14 

for 4

00 L

Kept in

 abe

yance 

based on

  req

uest of 

hospita

l autho

rities 

Special B

uildings

118

P.38

5, 2

Vatakara

Kozhikod

e Construction of multistoried block for Govt.Taluk 

Hospital, Vatakara

4210

‐01‐11

0‐74

500

G.O(Rt) No. 141

9/20

09/PWD 

dated Tvm 9.09.20

10 fo

r Rs 5

00L

157/CE

/Bldgs/11‐12

 dtd 

28.3.201

2 for 5

60L

18.6.201

2

SE(K)45/20

12‐13 dated 

29.12.20

12

M/s KSCC Ltd

7.5%

 abo

ve E/R

5275

1000

5670

7170

24

9.01

.201

3

Structure work completed

. Work term

inated

 as p

er CE's 

orde

r.

374.67

L

150 Lakhs

Balance work un

der N

ABAR

D

Koyiland

y

4210‐01‐110‐74(Plan) Works under DHS

33

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

119

P.39

9, 14

Kozhikod

e North

KKD

Health and

 Fam

ily W

elfare

H &FWD Construction of male ward in Govt Leprosy Hospital, Chevayur

4210

‐01‐11

0‐68

(Plan)

102L

G.O(Rt) No. 

3598

/201

3/H&

FWD dtd. 

Tvm. 25‐10

‐201

3DR

/18/14

‐15 dated 

27.05.20

15for R

s 100

L

22.09.20

14

EE(BC)28

/201

5‐16

 dt 

25.08.20

15

K.V. Santhosh Ku

mar

27% abo

ve ER

9365

824

1189

4596

12 m

onths

2.09

.201

5

1.09

.201

6

Work  com

pleted

.

100%

Kozhikod

e

North

Family 

re

H&FWD‐Annual Plan 2013‐14 ‐  68

(Plan)

No. 

H&FW

D 10

‐201

316

 dtd 

or 16.5L

16 16‐17 dt 

16 h Ku

mar

ve ER

21 04 hs started

de

4210‐01‐110‐68(Plan)

120

Kozhikod

KKD

Health and

 FWelfar Installation of Lift 

facility at Govt. General Hospital, 

Kozhikode

4210

‐01‐11

0‐

16.5L

G.O(Rt) N

3598

/201

3/H

dtd. Tvm

. 25‐

3045

/201

5‐1

03/02/20

16 fo

4.8.20

1

EE(BC)65

/201

6.09

.20

K.V. Santhosh

7.8%

 abo

v

1647

22

1775

70

6 mon

th

Agreem

ent s

Kozhikod

121

P.39

2, 5

Kuttiady

KKD

New Building for Hospital at Kuttiyadi

4210

‐02‐10

3‐95

50

A.S. not accorde

d

Koyiland

y

122

P.39

3, 9

Koyiland

y

KKD PHC, Mudadi

4210

‐02‐10

3‐95

45

Land

 not available

Koyiland

y

4210‐02‐104‐95 Community Health Centres

34

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

123

P.39

6, 4

Perambra

KKD Qrts at CHC, 

Perambra

4210

‐02‐10

4‐95

A.S. not 

accorded

Koyiland

y

124

P.39

8, 7

Kunn

amanga

lam

KKD MCH Sub Centre at 

Cheruppa

4210

‐02‐

110‐96

A.S. not 

accorded

Special 

Build

ings

125

399, 14

zhikod

e N

KKD

DP Block at Lepresy hospital 

210‐02

‐10

‐96

S. not 

corded

zhikod

e

4210‐02‐110‐96 ‐Improvements to Allopathy Health Facilities

P.3

Koz KKD 42 1 A. acc

Koz

126

P.41

8, 5

Kozhikod

e North

KKD

Health and

 Fam

ily W

elfare

Construction of Hospital Building at GHMC, Kozhikode 

Phase I & II

4210

‐03‐10

2‐98

(P)

1055

 lakhs

GO Rt N

o 10

95/201

2/H&

FWD 

Dated 29

‐03‐20

12. R

s.7.35

 Crores a

nd 

G.O(Rt)No. 262

4/20

14/H&FW

D dated 2.8.14

 Re

g.No.3/PW

D/BL/201

4‐15

 dated

 06

.02.20

15 of C

hief Engineer(B) 

Thiru

vananthapu

ram

12.08.20

15

SE(K)16/20

16‐7 dated

 31.05

.201

6

A.M.M

oham

med

 Ali

17.44%

 abo

ve ER

9577

0821

1124

7325

2

18 m

onths

Work started

Special B

uildings

4210‐03‐102‐98 ‐Homoeo Medical colleges

35

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

124

Kozhikod

e North

KKD

Construction of Second floor to the 

Existing Administrative 

block for Pathology Department 

attached to Govt. Homeo Medical 

College, Kozhikode.

4210

‐03‐10

2‐98

180L

GO (R

t) No. 262

4/20

14/H&FW

D

1979

/201

5‐16

 dtd 11.12

.15 for 

195.5L

16.01.20

16

SE(K)103

/201

5‐16

 dated

 22.3.16

T.Ab

dul Rashe

ed

6.5%

 abo

ve ER

1781

3617

1897

1502

18 m

onths

Work  in

 progress.

70%

Special B

uildings

orth

5‐96 ngs

4210‐03‐105‐96 ‐Nursing College Kozhikode

127

P.42

1, 1

1100

0

Kozhikod

e No

KKD Nursing college, 

KKD

4210

‐03‐10

5

No A.S.

Special B

uildi

128

P.42

1, 2

2443

000

Kozhikod

e North

KKD

Health and

 Fam

ily 

Welfare Mens Hostel for 

Nursing college, KKD

4210

‐03‐10

5‐96

250 Lakhs

G.O(Rt)No.19

65/200

9/H&

FWD dtd 

10.07.20

09;250

 lakhs

CE/Bldgs/KKD

/244

9/20

10 Dt.1

9.05

.201

2 Rs

28750

Lakh

SE(K)12/20

13‐14 

dt.01.06

.201

3

Mr.P

.V.Biju

20% abo

ve ER

2354

2362

2825

0834

24 m

onths

7.6.20

13

6.6.20

15

Work completed

.

100%

completed

.

184.68

L

145 Lakhs

Special B

uildings

36

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

129

Kozhikod

e North

KKD

Health and

 Fam

ily W

elfare

Construction of Ladies Hostel Ist floor ( Men's 

Hostel converted to Ladies Hostel) ‐GOVT: COLLEGE OF 

NURSING, KOZHIKODE. 

 

125 lakhs

G.O(RT) No.18

30/16 12

5lakhs

Estim

ate subm

itted

 for T

S

Special B

uildings

orth

amily 

Construction of  5‐96

5/ 

D dt. 

13 t 9.1.14 

khs

14 15 dtd 

4 e E/R

2 8 s 14 15 ed upto 

ed. FCC

 d. s ings

130

P.41

9, 8

Kozhikod

e N

KKD

Health and

 Fa

Welfare addl. Class room at 

Govt. Nursing College, Kozhikode

4210

‐03‐10

5

30GO(Rt)34

5 520

13/H&FW

D10

.10.20

1DR

/80/13

‐14 dt

for R

s 30 la

25.03.20

1

EE(BC) 48/14

‐118

/12/14

Hashif N

28.84%

 abo

ve

2792

632

3598

028

6 mon

ths

18.12.20

1

17.06.20

1Extension applie

17.9.15

14.9.15

Work complete

subm

itted

100%

35 Lakh s

Special B

uild

131

Kozhikod

e North

KKD

Health and

 Fam

ily 

Welfare

Construction of compound wall and gate in the approach road at Govt. Nursing 

College, Kozhikode 4210

‐03‐10

5‐96

8.5

GO(Rt)No.32

30/ 

2015

/H&FW

D dt. 

3.10

.201

543

9/20

16‐17 dtd 

31.05.20

16 fo

r Rs 

8568

6624

.06.20

16

EE(BC) 49/16

‐17 dtd 

01/08/16

K.V.Santho

sh Kum

ar

8.7%

 abo

ve ER

8433

21

9166

90

4 Mon

ths

Work in progress

70%

Special B

uildings

37

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

132

Kozhikod

e North

KKD

Health and

 Fam

ily W

elfare

CNC Developments‐ Tarring of a 

approach road to Govt Nursing College and providing 

interlocking tiles in front of college building attached to Govt Medical College, Kozhikode

4210

‐03‐10

5‐96

10.5

O(Rt)No.27

66/ 2

014/H&

FWD dt. 12.08

.201

4

532/20

16‐17 dtd 3.6.20

16 fo

r Rs 1

1500

00

24.06.20

16

EE(BC) 54/16

‐17 dtd 01

/08/16

K.M. Shafiq

ue

8.94

% below

 ER

1149

812

1047

019

4 Mon

ths

Agreem

ent e

xecuted. W

ork just started.

10%

Special B

uildings

G

133

P.42

4, 2

1544

9000

Kozhikod

e North

KKD

Renovation of B type staff qrts  for Medical College, 

KKD

4210

‐03‐10

5‐92

A.S. not obtaine

d

Special B

uildings

134

7700

0

Kozhikod

e North

KKD

Addnl facilities for  Medical College, 

KKD

4210

‐03‐10

5‐92

A.S. not obtaine

d

Special B

uildings

4210‐03‐105‐92 ‐Medical College Kozhikode

38

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

135

7700

0

Kozhikod

e North

KKD

Maintenance works  for  Medical 

College, KKD

4210

‐03‐10

5‐92

Work arranged

 un

der 

mainten

ance not 

requ

ired.

Not re

quire

d.

Special B

uildings

136

P.42

4, 7

7700

0

Kozhikod

e North

KKD

Renovation works for C‐type Qrts at  Medical College, 

KKD

4210

‐03‐10

5‐92

30

A.S. not accorde

d

Special B

uildings

8 0 North Renovation works 

f M d 5‐92

aine

d

ed.

dings

137

P.42

4, 8

5407

000

Kozhikod

e N

KKD

for Mens and Ladies hostel 

blocks at  Medical College, KKD 42

10‐03‐10

5

70

A.S. not obta

Not re

quir

Special B

uild

138

P.42

4, 9

7700

0

Kozhikod

e North

KKD

Renovation works for Electrical and Lift works at  

Medical College, KKD 4210

‐03‐10

5‐92

36

A.S. not obtaine

d

Special B

uildings

139

P.42

4, 9

Kozhikod

e North

KKD

Health and

 Fam

ily W

elfare

H&FWD ‐Renovation work of Men's Hostel I&II in Govt. 

Medical College, Kozhikode

4210

‐03‐10

5‐92

(Plan)

75GO(Rt)34

59/ 

2013

/H&FW

D dt. 

10.10.20

13 Rs.75

 LDR

/11/20

14‐15 dated 

26.05.20

14

13.09.20

14

EE(BC)67

/201

4‐15

Mr.K

.V Santhosh Ku

mar

13.8%above ER

7483

546

8516

275

8 mon

ths

16.03.15

Work  com

pleted

.

100%

8516

275

Special B

uildings

39

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

140Ko

zhikod

e North

KKD

Health and

 Fam

ily 

Welfare

Construction of second floor to GNM Hostel at Govt Medical 

College KozhikodeCollege, 

Kozhikode 4210

‐03‐10

5‐92

(Plan)

120

GO(Rt) 428

/201

4 H&

FWD dt.6.02.14

Reg.No.CR

/26/20

14‐

15 dt.2

9‐12

‐14

SE(K)46/20

15‐201

6 dt.20.11

.15

N.Noo

rudh

een K P

27.87%

 abo

ve ER

1137

6423

1441

9162

8 mon

ths

29.11.15

28.08.16

Finishing work in 

progress.

85%

30 Lakhs

Special B

uildings

141

P.42

5, 18

3860

00

Kozhikod

e North

KKD

Health and

 Fam

ily 

Welfare

Improvement to Gastro entrology Dept. & BM&BC to Campus road in Govt. Medical College, KKD 42

10‐03‐10

5‐92

750

G.O.(R

t)No.40

42/

2013

/H&FW

D dated 05

‐12‐20

13 

CE/BLD

S/10

416/K

KD/201

3 Da

ted 

22‐01‐20

12

SE(K)26/20

14‐15 

dt.29.10

.14

M/s.ULCCS

 Ltd.

21% abo

ve ER

6.18

4 CR

7.51

2 CR

12 m

onths

30.10.20

14

29.10.20

15

Work completed

.

100%

In Progress

1.71

Cr

Special B

uildings

4  Ali

142

3860

00

Kozhikod

e North

KKD

Health and

 Fam

ily 

Welfare Ladies Hostel for 

Govt. Medical College, Kozhikode

4210

‐03‐10

5‐92

880

GO(Rt) 221

0/20

12 

H&FW

D dt.03.06

.12 

for 8

80 L

43/CE/BLDG

/201

3‐14

dt. 22.11

.201

3 for8

80L

SE(K)24/20

14‐15 

dt.04.10

.201

4

Sri.A

.M.M

oham

med

 A

20% abo

ve ER

7875

0691

9450

0830

24 m

onths

20.10.20

14

Work  com

pleted

.

109L

Rs.9.45 CR

Work ne

aring 

Completion

Special B

uildings

143

P.42

5, 15

7720

00

Kozhikod

e North

KKD

Compound wall  for  Medical College, KKD

4210

‐03‐10

5‐92

A.S. not obtaine

d

Special B

uildings

40

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

144

Kozhikod

e North

KKD

Health and

 Fam

ily 

Welfare

Construction of Lecture Hall 

Complex in Govt. Medical college

4210

‐03‐10

5‐92

1000

 Lakhs

G.O.(R

t)No.40

40/113

/H 

&FW

D dated 05

/12/20

13 

for R

s.10

00L

CE/BLD

S/10

417/KK

D/20

13 Da

ted 22

‐01‐20

13 fo

r Rs

1000

L6.6.20

14

SE(K)45/20

15‐16 

16.11.15

Sri.M

uham

madali N

irman

32% abo

ve ER

8369

0730

1129

8248

6

24 m

onths

25.11.20

15

24.11.20

17

Work in progress.

40%

2.50

 CR

Special B

uildings

145

P.42

5, 16

3012

9000

hikode

 North

KKD

PWD Addl. Block at 

Dental College, KKD10

‐03‐10

5‐92

390

350/ 201

1/ PWD 

dt. 

2.20

11 390

 lakh

dgs/33

65/201

1 t.1

9/12

/13 

Rs39

0lakh

2.6.20

14

K)31

/201

4‐15

 13

.11.14

Sri.B

alan

88% abo

ve ER

3779

3776

4455

1303

10 m

onths

22.11.14

21.09.15

31.12.15

completed

. FCC

 er preparatio

n.

275L

4.45

 CR

ork ne

aring 

ompletion.

ecial B

uildings

Koz

421

GO(Rt)3

25.02

CE/Bld dt R

SE(K

17.8 4 1

Work c

unde W cSpe

146

P.43

6, 

3012

9000

Kozhikod

e North

KKD

Health and

 Fam

ily W

elfare

Addl. Block at Dental College, 

KKD ‐ Phase 2 and Phase 3

4210

‐03‐10

5‐92

(Plan)

295

GO(Rt)60

2/ 201

4/ H&FW

D Tvm dt. 

21.02.20

14 fo

r 220

 lakh and

 GO(Rt)28

29/ 

2014

/ H&FW

D Tvm dt. 18

.08.20

14  

181/20

16‐17 dated 5.5.20

16 of C

E Bu

ildings fo

r Rs 2

95L

25.07.20

16

SE(K)34/20

16‐17 23

.08.16

T.Ab

dul Rashe

ed

Item ra

te

2706

9698

2584

6416

18 m

onths

Agreem

ent e

xecuted.

15%

2.00

 CR for 2

016‐17

Special B

uildings

41

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

147

Kozhikod

e North

KKD

Health and

 Fam

ily W

elfare

Construction of flat type Gazetted 

officers Quartes in Govt. Medical 

College, Kozhikode

4210

‐03‐10

5‐92

(Plan)

1500

GO(Rt) 289

2/20

14 

H&FW

D dt.23.08

.14 for 

1500

 L

To be tend

ered

 for w

ant 

of hindrance free

 land

1.50

 CR

Special B

uildings

148

kode

 North

KKD

d Family W

elfare

Construction of flat type Non Gazetted officers Quartes in G t M di l ‐1

05‐92(Plan)

3000

5/20

15‐H&FW

D 08

.07.15

 

ered

 for w

ant o

f nce free

 land

.00 CR

al Buildings

Kozhik

Health and Govt. Medical 

College, Kozhikode

4210

‐03

GO(Rt) 212 dt.0

To be tend

ehind

ran 1

Specia

149

Kozhikod

e North

KKD

MCC

Govt.Medical college, Kozhikode‐Developments‐Construction of Multi compound wall for proposed Gandhi park

4210

‐05‐10

5‐92

(Plan)

20

D1/589

0/20

15/M

CC Dated

 30

‐03‐15

KKD/20

15‐201

6/20

15/292

9 dtd 4.9.15

 for 2

0L

20.11.15

EE(BC)71

/201

5‐16

 dtd 

1.1.20

16

C.An

ilKum

ar

7.47

% abo

ve E/R

1995

326

2144

377

4 Mon

ths

Work completed

.

20 Lakhs

Special B

uildings

42

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

150

Kozhikod

e North

KKD

MCC Govt.Medical 

college, Kozhikode‐Developments‐Construction of compound wall for proposed Netaji park.

4210

‐05‐10

5‐92

(Plan)

20

D1/583

7/20

15/M

CC Dated

 30‐03

‐15

KKD/20

15‐201

6/20

15/293

2 dtd 

11.9.201

5 for 2

.09L

20.11.20

15

EE(BC)72

/201

5‐16

 dted 1.1.20

16

C.An

ilKum

ar

7.47

% abo

ve E/R

2089

313

2245

385

4 Mon

ths

Work completed

.

20 Lakhs

Special B

uildings

Connecting  n) Dated 

3094

 L ted 

ar

151

Kozhikod

e North

KKD

MCC

gpassage on first floor for college of Pharmaceutical Sciences attached to Govt.Medical college, Kozhikode 42

10‐03‐10

5‐92

(Pla

20

D1/181

29/201

3/MCC

 D28

‐03‐15

KKD/20

15‐201

6/20

15/ 3

dtd 16

.9.15 for 2

0L

15.12.15

EE(BC)91

/201

5‐16

 da t

12.2.201

6

K.V. Santhosh Ku

ma

10% abo

ve ER

1798

473

1978

320

6 mon

ths

Work completed

.

20 Lakhs

Special B

uildings

152

Kozhikod

e North

KKD

MCC

Reconstruction of connecting passage for SDSM & DEF in Govt. Medical college, Kozhikode.

4210

‐03‐10

5‐92

(Plan)

20

D1/796

1/20

15/M

CC/ D

ated

 03

‐08‐20

15

KKD/20

15‐201

6/20

15/297

4 dtd 16

.9.15 for 2

0L

K.V. Santhosh Ku

mar

Work in progress.

60%

Special B

uildings

43

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

153

Kozhikod

e North

KKD

MCC

Govt. Medical college, Kozhikode‐Developments‐Construction of compound wall for STP

4210

‐05‐10

5‐92

(Plan)

19.35

D1/297

/200

7/MCC

 Dated

 30

‐03‐15

KKD/20

15‐201

6/20

15/308

8 dtd 17

.9.15 for 1

9.17

L

20.11.20

15

EE(BC)70

/201

5‐16

 dted 

1.1.20

16

C.An

ilKum

ar

7.47

% abo

ve E/R

1916

522

2059

687

4 Mon

ths

Work completed

.

20.Lakhs

Special B

uildings

154 de North

KD CC

Modification and Renovating of Dining yard and  05

‐92(Plan)

0 5/MCC

 Dated

 03

‐15

16/201

5/29

31 

15 fo

r 20L

mpleted

.

akhs

Build

ings

154

Kozhikod KK M outer drying yard 

of patients bystanders at MCH.

4210

‐03‐10 2

D1/556

4/20

1530

‐0

KKD/20

15‐201

dtd 17

.9.1

Work co

20.L

Special B

155

Kozhikod

e North

KKD

MCC

Renovation of Kitchen, Store and mess hall of the Nurses hostel, Calicut Medical college

4210

‐03‐10

5‐92

(Plan)

7

D1/999

4/20

14/M

CC/ D

ated

 26‐09

‐15

1847

/201

5‐20

16 dtd 3.12.20

15 fo

r 7L

29.01.20

16

EE(BC)02

/201

6‐17

 dtd 23.05

.201

6

Santho

sh Kum

ar KV

13.4% below

 ER

6999

47

6061

54

4 Mon

ths

Work completed

.

100%

Special B

uildings

44

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

156

Kozhikod

e North

KKD

MCC

Govt. Medical College Kozhikode ‐  Development ‐ Additional work for renovation of House Surgeon Quarters at Medical College Health Unit Cheruppa.

4210

‐03‐10

5‐92

(Plan)

11

D1/133

02/201

5/MCC

, DAT

ED: 26/09

/201

5

KKD/20

15‐201

6/20

15/421

0 dtd 23

.11.15

 for 1

1L

Sri.E.M

ujeeb Ra

hman

6 Mon

ths

01.01.20

16

Work completed

.

100%

11. Lakhs

Work Started.

Special B

uildings

157

P.42

5, 17

Kozhikod

e North

KKD

Health

Residential Quarters for PG students in Govt.Medical 

College Kozhikode

4210

‐03‐10

5‐92

 (Plan)

1244

Go(Rt)No.21

59/201

3/H&

FWD Dtd 

20.06.13

 for R

s.12

44 Lakhs

1244

 Lakhs

22.9.201

4

SE(K)21/20

15‐16 dtd 1.8.20

15

Sri,M

uham

madali,N

irman

38.79%

1103

7701

9

1531

9226

7

30 M

onths

7.8.20

15

6.2.20

18

Structure completed

. Finish

ing work in 

progress.

75%

Special B

uildings

45

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

158

Kozhikod

e North

KKD

MCC

Construction of building with 

connected corridor for laundry in super speciality building attached to Govt Medical College, Kozhikode 42

10‐03‐10

5‐92

 (Plan)

20

D1/112

26/201

5/MCC

 dt 

26.09.20

15 fo

r Rs 2

0L

3025

/201

5‐16

 dt 0

2.02

.201

6

29.02.20

16

EE(BC)10

5/20

15‐16 dt 4.3.201

6

K.V.Santho

sh Kum

ar

4.3%

 abo

ve ER

1998

784

2084

732

4 Mon

ths

Work completed

100%

Special B

uildings

rth

Govt. Medical College,Kozhikode‐ Developments‐  (P

lan)

/MCC

15 .02.20

16 

6 7 dated 

umar

ER ess.

ngs

159

Kozhikod

e No

KKD

MCC

pModification of Varandah in Radiology 

Department, Govt. Medical

College,Kozhikode

4210

‐03‐10

5‐92

 

20

D1/103

33/201

5/Da

ted 21

‐11‐

3188

/201

5‐16

 dt 0

9for 2

0L

14.03.20

16

EE(BC)16

/201

6‐17

4.06

.201

6

K.V.Santho

sh Ku

14.6% below

 

1999

822

1707

848

4 Mon

ths

Work in progre

90%

Special B

uildin

160

Kozhikod

e North

KKD

MCC

Govt. Medical College,Kozhikode‐ Developments‐ Construction of Isolation ward 

(ward 43) in Govt. Medical

College,Kozhikode 4210

‐03‐10

5‐92

 (Plan)

20

D1/103

51/201

5/MCC

Dated 22

.03.16

533/20

16‐17 dated 03

.06.20

16 

for R

s 20 lakhs

24.06.20

16

EE(BC)50

/201

6‐17

 dated

 1.08

.201

6

K.V.Santho

sh Kum

ar

10.7% below

 ER

1999

796

1785

818

4 Mon

ths

Agreem

ent e

xecuted. W

ork 

started.

Special B

uildings

46

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

161

Kozhikod

e North

KKD

MCC

Govt. Medical College,Kozhikode‐ Improvements‐ Renovation of 

Dissection Hall for Anatomy 

Department 4210

‐03‐10

5‐92

 (Plan)

16.5

D1/218

9/20

16/M

CCDa

ted 3.03

.16

517/20

16‐17 dated 03

.06.20

16 

for R

s 16.5 lakhs

24.06.20

16

EE(BC)53

/201

6‐17

 dated

 1.08

.201

6

P. M

oham

med

21.21%

 below

 ER

1649

983

1300

022

4 Mon

ths

Work completed

.

Special B

uildings

rth

Govt. Medical College,Kozhikode‐  (P

lan)

/MCC

16 3.06

.201

6 hs 6 7 dated 

ed w ER

ted.

ngs

162

Kozhikod

e No

KKD

MCC

g ,Improvements‐ 

Construction of car shed and providing interlock tiles for Pharmacy College 42

10‐03‐10

5‐92

 

20

D1/129

84/201

5/Da

ted 4.03

.1

516/20

16‐17 dated 03

for R

s 20 lakh

24.06.20

16

EE(BC)52

/201

6‐17

1.08

.201

6

P. M

oham

me

17.28%

 below

1993

887

1649

344

4 Mon

ths

Work comple t

Special B

uildin

163

Kozhikod

e North

KKD

MCC

Govt. Medical College,Kozhikode‐ Developments‐ Construction of cCentralised Air compressor room in between MICU 

and ward‐1 4210

‐03‐10

5‐92

 (Plan)

6.37

D1/190

28/201

5/MCC

Dated 11

.01.16

1279

/201

6‐17

 dated

 30

.06.20

16 fo

r Rs 6

.37 lakhs

06.08.20

16

EE(BC)69

/201

6‐17

 dated

 8.09

.201

6

Santho

sh Kum

ar KV

11.3% below

 ER

6368

43

5648

80

3 Mon

ths

Work completed

.

Special B

uildings

47

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

164

Kozhikod

e North

KKD

MCC

Govt. Medical College,Kozhikode‐ Improvements ‐ 

Renovation work in the Department of Nuclear Medicine

4210

‐03‐10

5‐92

 (Plan)

13

D1/103

49/201

5/MCC

Dated 7.12

.15

1280

/201

6‐17

 dated

 30

.06.20

16 fo

r Rs 1

3 lakhs

06.08.20

16

EE(BC)71

/201

6‐17

 dated

 8.09

.201

6

Santho

sh Kum

ar KV

25% below

 ER

1316

388

9872

91

4 Mon

ths

Work completed

.

Special B

uildings

rth

MCC Developments‐  (P

lan)

/MCC

16 ated

 20

 lakhs

6 7 dated 

ar KV

ER ted.

ngs

165

Kozhikod

e No

KKD

MCC

pRenovation work pf Radio Diagnosis Department DEF Block in Govt Medical College 42

10‐03‐10

5‐92

 

20

D1/156

4/20

16/

Dated 31

.03.1

1483

/201

6‐17

 d12

.07.20

16 fo

r Rs  2

09.09.20

16

EE(BC)83

/201

6‐17

7.10

.201

6

Santho

sh Kum

a

20.7% below

 

1999

653

1585

725

4 Mon

ths

Work comple t

Special B

uildin

166

Kozhikod

e North

KKD

MCC

MCC Developments‐ 

Providing additional parking facilities near 

South East side of Incinerator room in IMCH attached  in Govt Medical 

College

4210

‐03‐10

5‐92

 (Plan)

5.61

D1/785

1(1)/201

6/MCC

Dated 16

.06.16

1206

/201

6‐17

 dated

 28

.06.20

16 fo

r Rs 5

.61 lakhs

06.08.20

16

EE(BC)88

/201

6‐17

 dated

 25

.10.20

16

Ranjith

 K V

14.6% below

 ER

5607

63

4788

92

3 Mon

ths

Agreem

ent e

xecuted

Special B

uildings

4210‐03‐105‐78 Dental College Kozhikode

48

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

167

P.43

6,1

1000

00

Kozhikod

e North

KKD

LA and building works in Dental 

College , Kozhikode

4210

‐03‐10

5‐78

No A.S.

Not re

quire

d.

Special B

uildings

168

P.43

6,3

1000

00

Kozhikod

e North

KKD

Boys Hostel in Dental College , 

Kozhikode

4210

‐03‐10

5‐78

500

Land

 not available

Special B

uildings

L

169

P.43

6,3

2000

00

Kozhikod

e Nor

KKD

Girls Hostel in Dental College , 

Kozhikode

4210

‐03‐10

5‐78 415

Land

 not 

available

Special 

Build

ings

170

P.43

8,8

1000

00

Kozhikod

e North

KKD

Renovation of hostels in Medical 

College, KKD

4210

‐03‐10

5‐72

120

No A.S.

Special B

uildings

4210‐03‐105‐72 Hostels in Medical Colleges and Paramedical colleges

49

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

171

P.43

8,10

Kozhikod

e North

KKD

Health and

 Fam

ily 

Welfare

Construction of Paramedical Hostel for 100 students in Govt. Medical 

College, Kozhikode

4210

‐03‐10

5‐72

(Plan)

400

GO(Rt) 238

9/20

14 

H&FW

D dt.15.07

.14 for 

400 L

TS not re

ceived

T.S. re

ceived

.Not 

tend

ered

 due

 to HFL

Special B

uildings

172

hikode

 North

KKD

d Family W

elfare Construction of 

Additional floor to Men's hostel 3 and General ward, 

Paediatric ward at third floor of PMR 3‐

105‐72

(Plan)

340

56/201

5/ H&FW

D t.1

7.08

.15 

2016

‐17 dated 

dated 13

.7.201

6 of 

neer

PWDfor3

405.8.16

‐17 dtd 01

.11.20

16

Shanavas

tem ra

te

0456

566

6927

349

8 mon

ths

men

t executed.

cial Buildings

Kozh

Health an third floor of PMR 

building in Govt. Medical College, 

Kozhikode

4210

‐0

GO(Rt) 265 dt

1515

/213

.07.20

16 

ChiefE

ngin

SE(K)45/16

K  It 3 2 1 8

Agreem

Spec

173

Kozhikod

e North

KKD

Health and

 Fam

ily 

Welfare

Construction of building for Drug Testing Laboratort 

at Kozhikode District 42

10‐04‐10

4‐99

218

GO(Rt) No. 

2353

/201

6/H&

FWD 

Dated Tvm. 25/08

/201

A.S. accorde

d.TS 

estim

ate to be 

subm

itted

.

Special B

uildings

174

P.44

6,1

KKD PH Lab at 

Kozhikode

4210

‐04‐10

7‐99

100

A.S. accorde

d in 

13th finance. 

Revised estim

ate  

subm

itted

.

Kozhikod

e

4210‐04‐104‐99 Strengthening of Drug control Dept

4210‐04‐107‐99 Public Health Lab

50

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

175

P.49

2,18

2000

00

Beypore

KKD

Constn of Pre Metric Hostel at 

Kadalundi

4225

‐01‐27

7‐98

Land

 not 

available

Kozhikod

e

176

P.49

2,19

2000

00

Balussery

KKD

Constn of Pre Metric Hostel at Naduvannoor

4225

‐01‐27

7‐98

Land

 not available

Koyiland

y

4225 ‐SC/ST,OBC 4225‐01‐277‐98‐Hostel for Boys 50% Central Aid

177    

Kozhikod

e North

KKD

SCDD

Renovation work for Govt. post metric hostel 

(women) Easthill Kozhikode

 

42.00 L

GO(Rt) No. 

1498

/201

3/SC.Dev.

Dpt. Da

ted Tvm. 

DR‐22/14

‐15 dtd 

21.7.14 for 4

2L

EE(BC)5/15

‐16 dtd 

15.5.201

5

K.V.Santho

sh Kum

ar

22.8% abo

ve E/R

Rs. 392

2544

/‐

Rs 481

6885

/‐

6 mon

ths

18.05.20

15

17.11.20

15

Work completed

Kozhikod

e

178

P.49

2,25

2000

00

Kozhikod

e North

KKD

Constn of addnl. Block for Post Metric Hostel at 

Kozhikode

4225

‐01‐27

7‐98

250

Land

 to be 

iden

tified

Kozhikod

e

179

P.25

,96

Nadapuram

KKD

Construction of new block 

Nadapuram Govt. Hospital 33

1620

14

75.00 Lakhs

Koyiland

y

4225‐01‐277‐93‐Land and Building. I ‐Construction for Model Residential School

4059‐01‐051‐86

51

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

180

P.49

4,4

KKD MRS for Boys at 

Kozhikkode

4225

‐01‐27

7‐93

Work completed

Special B

uildings

7,10 000

uram

D

MRS, Kozhikkode‐  Construction of 

Model Residential ‐800

‐89

25 /201

5/SCSTDD

 8.09

.201

5

CE Bldgs dated

 19

.75 crores

stage.

uildings

4225‐01‐800‐89‐Land and Building. I ‐Construction for Model Residential School

181

P.49

7

1000

0

Nadapu

KKD Model Residential 

School at Maruthonkara, Kozhikode. 42

25‐01‐ 442

GO (R

t) No. 139

9/dated Tvm 8

2978

/201

6‐17

 of 

29.10.16

 for  1

Tend

er 

Special B

u

182

P.51

1,13

Kozhikod

e North

KKD

OBC Hostel for Girls at Kozhikode Medical College

4225

‐03‐27

7‐99

200

No A.S.

Special B

uildings

4225‐03‐277‐99 Hostel for OBC Students(Girls) (50% Central Aid)

4225‐03‐277‐99 Hostel for OBC Students(Boys)

52

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

183

P.51

2,14

Kozhikod

e North

KKD

OBC Hostel for Boys at Kozhikode Medical College

4225

‐03‐27

7‐98

No A.S.

Special B

uildings

184

P.58

8,2

2000

00

KKD

Building for Handicaped womens at kozhikode 42

35‐60‐80

0‐98 20

Land

 to be 

iden

tified

Kozhikod

e

dy ‐98

4235‐60‐800‐98 Social Security and Welfare

185

P.58

8,5

2000

00

Thiru

vambad

KKD Old home at 

Thiruvampady

4235

‐60‐80

0‐

Land

 to be 

iden

tified

Kozhikod

e

186

P.59

2,35

Kozhikod

e North

KKD

Social Ju

stice  Additional 

construction to the Govt. Short Stay 

Home

4235

‐60‐80

0‐98

30GO(Rt) No. 

507/20

14/SWD Dt. 

08.08.14

 for R

s. 

DR‐50/14

‐15 

Dt.13.10

14 fo

r Rs

3000

L24

.06.20

16

EE(BC)98

/201

6‐17

 dated 25

.11.20

16

Arun

 Kum

ar.

10% abo

ve ER

2942

049

3236

254

6 mon

ths

Work in progress

Kozhikod

e

187

Kozhikod

e North

KKD

Social Ju

stice  Repair works  to 

VTC building Mayanad, Kozhikode

4235

‐60‐80

0‐98

30GO(Rt) No. 

751/20

15/SJD Dt. 

30.12.15

 for R

s. 13L

Completed

.

Kozhikod

e

53

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

188Ko

zhikod

e North

KKD

Social Ju

stice 

Repair works and Sheet roofing for first floor of Govt Asha Bhavan Building and Mayanad, Kozhikode

4235

‐60‐80

0‐98

36.8

GO(Rt) No. 

751/20

15/SJD Dt. 

30.12.15

 for R

s. 

23.06.20

16

Jagadish

8.1%

 below

 E/R

Work Co

mpleted

.

Kozhikod

e

189

Kozhikod

e North

KKD

Renovation of Govt. Children's Home (Girls) at Vellimadukunnu, 

Kozhikode 4235

‐02‐80

0‐99

250L

GO(Rt)No.22

1/20

13/SJD 

Dt.16.05

.201

5CR

/16/20

13‐14 

Dt.22.10

.201

3 for 

Rs25

0L

16.11.20

13

SE(K)33/20

13‐14 

Dated 13

.01.20

14

Arun

kumar

1.60

% below

 E/R

2467

6798

2428

1969

10 M

onths

22.01.20

14

21.11.20

14

23.02.20

15

21.02.20

15

Work completed

.

100%

128.8L

Kozhikod

e

4235‐02‐800‐99 (P) Social Justice

190

Kozhikod

e North Renovation of 

Govt. Children's Home (Boys) at Vellimadukunnu, 

Kozhikode

8443

‐00‐10

8‐PW

D De

posit

170L

GO(Rt)No.20

/201

4/SJD 

Dt.06.01

.201

4

CR/22/20

14‐15 Dt.29.11

.201

4 for 

Rs.170

 L

08.01.20

15

SE(K)25/20

15‐16 Da

ted 

11.08.20

15

Arun

kumar

12.60%

 Abo

be E/R

1585

9496

1785

7793

10 m

onths

27.02.20

15

26.12.20

15

Work completed

.

100%

191

P.61

4,5

Kozhikod

e North

KKD

Construction of new building for Nirbhaya Shelter 

Home at Vellimadukunnu, 

Kozhikode 4235

‐02‐10

3‐99

52GO(Rt) No. 

336/20

13/SJD Dt. 

08.07.20

13 fo

r 26

2/20

15‐15 

Dt.11.03

.15 for 

Rs52

00L

11.09.15

EE(BC)77

/15‐16

 dtd 

04.01.20

16

Arun

kumar

16.20%

 abo

ve ER

4996

929/‐

5806

432/‐

12 M

onths

19.09.20

15

18.09.20

16

Finishing stage.

80%

Kozhikod

e

4235‐02‐103‐99 (P) Social Justice

54

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

192

Kodu

vally

KKD

Construction of building for 

Anganavadi No.89 at Modayani in Madavoor 

Gramapanchayath. 4235

‐02‐10

2‐90

13.00 L

GO(Rt)No.33

2/20

15/SJD 

for 1

3 L

KKD/20

15‐

2016

/201

6/19

94 dtd 

0103

2016

30.8.201

6

EE(BC)90

/16‐17

 dtd 

27.10.20

16

Prabeesh C K

4.79

% abo

ve ER

1174

055

1230

292

6 mon

ths

Work started.

Kozhikod

e

4235‐02‐102‐90 (P) Social Justice

4235‐02‐102‐95 (P) Social Justice

193

Kodu

vally

KKD

Construction of Model Anganavadi 

building in Madavoor 

Gramapanchayath. 4235

‐02‐10

2‐95

20G.O.(R

t) No. 

520/20

13/SJD dtd 

17.10.20

13 fo

r 20L

DR‐81/14

‐15 dt 

18.02.20

15 fo

r Rs 

20L

30.12.20

15

EE(BC)89

/201

5‐16

 dt 09.02

.201

6

K.C.Prem

anand

4% abo

ve ER

1873

535

1948

476

6 mon

ths

19.2.16

18.8.16

Work in progress

Kozhikod

e

194

Kunn

amangalam

KKD

Construction of new building for Anganavadi at Muzhapalam, 

Mavoor Gramapanchayath. 42

35‐02‐10

2‐95

20GO(Rt) No. 

520/20

13/SJD 

Dt.17/10

/201

3 for 

1162

/201

5‐16

 Dt.16.09

.201

5 for 

Rs20

00L

16.10.20

15

EE(BC)49

/201

5‐16

 Dt.28.11

.201

5

Shaiju A P

9.52

% abo

ve ER

1991

143/‐

2180

700/‐

9 Mon

ths

8.12

.15

7.9.16

Work completed

100%

Kozhikod

e

4235‐02‐102‐96 (P) Social Justice

55

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

195

Kunn

amangalam

KKD

Construction of building for 

Anganavadi No.55 at Thekkepadam in 

Perumanna Gramapanchayath. 42

35‐02‐10

2‐96

13

GO(Rt) No. 332

/201

5/SJD Dt.05.06

.15 

for R

s. 13.00

 L

1161

/201

5‐16

 Dt.1

6.09

.15 for R

s. 

13.00L

17.12.15

EE(BC)81

/201

5‐16

 dtd 18.01

.201

6

M K Kun

hamu

8.5%

 abo

ve ER

1258

517

1365

491

7 mon

ths

27.01.20

16

26.08.20

16

Work completed

Kozhikod

e

s. 

16

196

Kunn

amangalam

KKD

Construction of building for 

Anganavadi No.53 at Nechiyilthazham 

in Perumanna Gramapanchayath. 42

35‐02‐10

2‐96

13

GO(Rt) No. 332

/201

5/SJD 

Dt.05.06

.15 for R

s. 13.00

 L

1160

/201

5‐16

 Dt.1

6.09

.15 for R

13.00L

17.12.15

EE(BC)80

/201

5‐16

 dtd 18.01

.201

M K Kun

hamu

8.8%

 abo

ve ER

1153

984

1255

535

7 mon

ths

27.01.20

16

26.08.20

16

Work completed

.

100%

Kozhikod

e

56

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

197

Kunn

amangalam

KKD

Construction of building for 

Anganavadi No.148 at Mini 

Chathankavu in Kunnamangalam Gramapanchayath.

4235

‐02‐10

2‐96

11.66L

G.O.(R

T) No.71

/201

5/SJD dtd Tvm 

7.02

.15 for 1

1660

00

382/15

‐16 dt 03.07

.15 for 1

1.66

L

3.9.15

EE(BC)07

/201

6‐17

 dated

 01

.06.20

16

Ajeesh E T

16.58%

 abo

ve ER

1151

665

1342

611

6 mon

ths

Nearin

g completion

60%

Kozhikod

e

96 15 SJD 

dt 

13L

6 dt 

n ER .

198

Balussery

KKD

Construction of building for 

Anganavadi No.11 at Govindanellur.

4235

‐02‐10

2‐9

13L

G.O.(R

t) No.33

2/20

1dt 5.6.201

5

1715

/201

5‐16

 d23

.11.20

15 fo

r 1

15.01.20

16

EE(BC)95

/201

5‐1 6

19.02.20

16

Sri. P.Sugunan

1.62

% below

 E

1185

264

1166

063

5 mon

ths

Work started .

Koyiland

y

199

Elathu

r

KKD

Social Ju

stice 

Construction of Anganvadi building in Therambath meethal in 

Kuruvattur Grama Panchayath 42

35‐02‐10

2‐96

13

G.O.(R

t) No.33

2/20

15 

SJD dt 5.6.201

5

KKD/20

15‐

16/201

16/183

3.8.20

16

EE(BC)67

/201

6‐17

 dt 

7.09

.201

6

Vijeesh P R

10% abo

ve ER

1174

055

1291

461

6 mon

ths

Work started.

Kozhikod

e

57

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

200

Kunn

amangalam

KKD

Social Ju

stice  Balance work and 

Addition of FF of Anganvadi No:84 at Koleripoyil

4235

‐02‐10

2‐96

13

G.O.(R

t) No.32

3/20

15/SJD dt 4

.06.15

3746

/201

5‐16

 dt 0

1.03

.201

6 for R

s 13 

lakhs

3.8.20

16

EE(BC)80

/201

6‐17

 dt 3

.10.20

16

Prabeesh C K

0.01

% below

 ER 

1238

163

1238

040

6 mon

ths

Work started.

Kozhikod

e

201

Kunn

amangalam

KKD

Social Ju

stice 

SJD‐ICDS‐ Construction of building for 

Anganwadi No.113 at Pullangottumala 

in Chathamangalam Gramapanchayath.

4235

‐02‐10

2‐96

13L

G.O (R

t) No. 332

/201

5/SJD dtd 05

‐06‐

2015

Quo

tatio

n subm

itted

 for a

pproval.

Kozhikod

e

202

Kunn

amangalam

KKD

SJD‐ICDS‐ Construction of building for 

Anganwadi No.98 at Kavungal in 

Chathamangalam Gramapanchayath.

4235

‐02‐10

2‐96

13L

G.O (R

t) No. 

332/20

15/SJD dtd 05‐

06‐201

530

60/201

5‐16

 dated

 04

.02.20

16

11.03.20

16

EE(BC)26

/201

6‐17

 dated 15

.06.20

16

Alavi E M

0.77

% below

 ER

1162

682

1153

729

6 mon

ths

Site change requ

ired 

due to objectio

n

Kozhikod

e

58

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

203

P.61

6, 12

1000

00

Kozhikod

e North

KKD Building for District 

Form store, KKD

4058

‐01‐10

3‐99

35

Estim

ate subm

itted

 for 

T.S.

Kozhikod

e

m ry

Construction of Training center 9 5/

AD 

15 /251

dtd 

R d.

4058‐Printing and stationary‐103‐Govt press‐99‐Buildings

4403‐01‐101‐99 Animal Husbandry

204

Kunn

amangalam

KKD

Anim

al husband

r Training center complex at the Regional Paultry farm, Chathamangalam, KozhikodeBalance Work

4403

‐01‐10

1‐99

62L

GO. (Rt)No. 135

/201

5Da

ted 23

/01/20

1

KKD/20

15‐201

6/20

15dtd 5.8.20

15

9.10

.201

5

EE(BC)45

/201

5‐16

  d26

.11.15

Alavi E M

5.27

% below

 ER

6020

157

5702

895

12 m

onths

5.12

.15

4.12

.16

Work complete d

100%

Kozhikod

e

205

Kodu

vally

KKD

Planning

Construction of new building for 

Veterinary Dispensary, Kizhakkoth, Kozhikode 44

03‐01‐10

1‐99

43.60 Lakhs

M2 33

078/20

13 plg. D

t. 25

‐01‐

2014

 for 4

3.60

L

DR/89/13

‐14 dtd,.  11

‐02‐20

14 fo

r 43

.6L

1.6.20

16

EE(BC)64

/201

6‐17

 dtd 25.08

.16

Abdu

l Aziz

33.95%

 abo

ve ER

4084

842

5471

646

9 Mon

ths

Work in progress.

20%

Kozhikod

e

59

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

206    

Kozhikod

e

KKD

husbandry

Construction of building for veterinary dispensary Madavoor Kozhikode 44

03‐01‐10

1‐99

49.96 L

No.M2 10

522/20

15/plg. 

Dtd 8/5/20

15 of D

irector 

of Animal husband

ary

361/20

15‐16 dt 1.07.15

 for 

49.96L

11.09.15

EE(BC)79

/201

5‐16

 dtd 

13.1.16

ULCCS

14.91%

 abo

ve E/R

4811

559

5528

962

12 m

onths

Work started

Kozhikod

e

207 vambady

Construction of Veterinary hospital  00

‐101

‐99

35L

332/20

15/plg. 

015 of Dire

ctor 

l husband

ary

16‐17 dated 

for R

s 33 lakhs

08.201

6

08.201

6

stian V.J

above ER

9966

6

2835

3

mon

ths

o be

 started

zhikod

e

Thiru

v

husbandry Kodenchery

4403

‐0

No.M2 20

3Dtd 1/10

/20

of Animal

1389

/201

08.07.20

16 

04.0

04.0

Seba

3.90

329

342

8 m

Work  to Koz

208

P.58

4,20

Koyiland

y

KKD

Agriculture

 Modification and extension of the existing Training Hall at RAIC, Kozhikode.  44

03‐00‐10

9‐97

 

25 L

GO (R

t) 

No.68

2/20

15/AD 

Dated. 30/03

/201

5

181/20

15‐16 dated 

31.7.201

5

22.12.20

15

EE(BC)90

/201

5‐16

 dtd 

10.2.16

Madhu

karan

15.63%

 abo

ve E/R

2143

892

2478

982

7 mon

ths

20.2.201

6

19.9.201

6

Work completed

.

100%

Kozhikod

e

209

3820

00

Kozhikod

e North

KKD

Tourism

Construction of carparking area, 

Drivers, Staff room at Guest House, 

Kozhikode 5452

‐01‐80

0‐98

56

GO(Rt)10

411/20

12/

TSM dt. 15

.12.20

12DR

/74/14

‐15 dt. 

06.11.20

14 fo

r Rs

56Lakhs

EE(BC)41

/201

5‐16

 dated 17

‐11‐20

15

Padm

akshan

 T

17.91%

 abo

ve E/R

4163

508

4909

192

6 mon

ths

Work in progress.

60%

Kozhikod

e

5452‐01‐800‐98 Tourism Development ‐ Buildings

4403‐00‐109‐97 Agriculture

60

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

210

P.63

4,25

Kozhikod

e North

KKD

Tourism

Renovation work to Guest House, 

Kozhikode

5452

‐01‐80

0‐98

70 Lakhs

GO(Rt)No.88

56/201

3/TSM. D

t. 01

‐11‐13

 for R

s 70L

DR/82/20

13‐14 dtd. 18‐01

‐201

4

EE(BC)69

/201

4‐15

 dated

 27‐03

‐20

15

Jagadish

62.42%

 abo

ve E/R

5642

301

9164

225

6 mon

ths

26‐01‐20

15

25.07.20

15

Work completed

4300

000

Kozhikod

e

211 ode North

KD urism

Construction of additional block to 

1‐80

0‐98

Lakhs

84/201

3/TS

0.01

.201

3 s. 425

LL/20

13‐14 

.201

4  fo

r 42

5L

/201

5‐16

 6.12

.201

5

Vatakara

bove ER

8511

3

7990

2

mon

ths

12.15

12.16

progress.

hiko

de

Kozhiko K

Tou Guest House, 

Kozhikode

5452

‐01

425 

GO(Rt)7 8

M dt. 30

for R

s80

CE/BL

dt. 03.03 Rs4

SE(K)59/

dated 26

ULCCS, 

35% ab

3318

447

12 m 15.1

14.1

Work in 

Kozh

212

Kozhikod

e North

KKD

Tourism

Renovation of Government Guest House Kozhikode ‐ Old block (Phase 2) ‐ Interior and furnishing work and renovation of Kitchen.

110L

AS accorde

d. TS 

estim

ate to be prep

ared

 in con

sulta

tion with

 GH 

authorities.

Kozhikod

e

213

3820

00

Vatakara

KKD

Tourism

Pilgrim Tourism at Lokanarkavu 

Temple Vatakara

5452

‐01‐80

0‐98

69.75

Go(Rt) 

7793

/200

9/TSM 

dt. 04.11

.200

9CE

/117

/BL/20

10‐

11 dt. 

2110

2010

SE(K)44/20

11‐12 

Dt.26‐12

‐11

ULCCS, V

atakara

15% abo

ve E/R

Rs. 958

0432

Rs. 110

1749

7

8 mon

ths

11‐02‐20

11

Estim

te fo

r balance work 

subm

itted

 for 

A.S.

Koyiland

y

LAC‐ADS WORKS ‐ PROGRESS OF WORK AS ON 31.01.2017

61

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

1Ko

zhikod

e South

Kozhikod

eGen

eral 

EducationChalappuram Govt. 

Ganapath Model Girls HS School 

building, Chalappuram 42

02‐02‐20

2‐99

 (NP)

100 Lakhs

GO(Rt) No. 

1140

/13 G. 

Edn. Tvm

. DR

/14/13

‐14 

dated 

1904

2013

EE(BC)49

/13‐

14 

dt30

0114

Sri. Majeed. K

8% abo

ve ER   

88,02,62

8

9506

838

12 m

onths

Work 

completed

29.39

2

P.36

3,1

Kozhikod

e South

Kozhikod

eGen

eral 

Education Construction of 

building for  Govt. Model H.S.S at Kozhikode 42

02‐02‐20

2‐99

 ( NP)

100 Lakhs

GO(Rt) No. 

1336

/13 G. 

Edn. Tvm

. DR

/13/13

‐14 

dated 

1904

2013

for

EE(BC)67

/13‐

14 dt.0

3.03

.14

Sri. Arun

 Kum

ar

23.4% abo

ve ER

86,44,25

3

1066

7008

12 m

onths

14.3.201

4

13.3.201

5

Work 

completed

02.13

Lakhs  

ol Autho

rity

3

Kozhikod

e South

Kozhikod

e

Gen

eral Edu

catio

n

LAC‐ADF 2012‐13 ‐ Construction of 

school building for Payyanakkal Govt. VHS, Kozhikode

4202

‐02‐20

2‐99

 (NP)

100 Lakhs

GO(Rt) No. 816

/13 G. Edn

. Tvm

. Dated

 19.0

DR/65/12

‐13 dated 30

.03.20

13 fo

r Rs. 100

 

23.08.20

13

EE(BC)54

/201

3‐14

 dated

 03.02

.201

4

Sri. C. Ja

yaprakasan

36.26 % abo

ve ER.

86,34,62

2

1,17

,65,53

6/‐

12 m

onths

26.09.20

14

12 m

onths

NIL

30.06.20

15

Work Co

mpleted

100%

work to be started

Rs.128

8323

0

Work completed

.Building hand

ed over to Scho

o

62

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

4

P.29

8,12

3

Kozhikod

e South

Kozhikod

e

Gen

eral Edu

catio

n

Meenchanda Govt.VHS School 

building

4202

‐01‐20

2‐99

 (NP)

100 Lakhs

Rt) N

o. 948

/13 G. Edn

. Tvm

. Dated

 27.02

.13

67/12‐13

 dated

 30.03

.201

3 for R

s. 100

 Lakhs 

24.07.20

13

EE(BC)59

/201

3‐14

 dated

 11.02

.201

4

Sri. M.P. D

asan

28% abo

ve ER

89,86,13

0

Rs.1,15,02

,246

12 m

onths

08.04.14

07.04.20

15

07.10.20

15

work completed

100%

Work to be Started

Rs.759

3482

.47

70 Lakhs

ork completed

.Final Bill und

er preparatio

n.

GO(

DR/6 Wo

5

P.29

8,12

4

Kozhikod

e South

Kozhikod

e

Gen

eral Edu

catio

n

Construction of building for 

Kinassery Govt. VHS School

4202

‐01‐20

2‐99

 (NP)

100 Lakhs

GO(Rt) No. 908

/13 G. Edn

. Tvm

. Dated

 23.02

.13

DR/66/12

‐13 dated 30

.03.20

13 fo

r Rs. 100

 Lakhs 

24.07.20

13

EE(BC)60

/201

3‐14

 dated

 11.02

.201

4

Sri. M.P. D

asan

19 % abo

ve ER

98,12,14

0

1,16

,76,44

7/‐

12 m

onths

08.04.14

12 m

onths

07.07.20

15

07.07.20

15

Work completed

100%

Work to be Started

Rs.601

6749

.53

50 Lakhs

Work completed

.Final Bill und

er preparatio

n.

63

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

6

P.33

3,52

Kozhikod

e South

Kozhikod

e

Gen

eral Edu

catio

n Construction of building for 

Chalappuram Govt. Boys High School in Kozhikode District 

2013‐14

4202

‐01‐80

0‐88

 LAC

 ADF

 (NP)

100 Lakhs

GO(Rt) No. 370

5/13

 G. Edn

. Tvm

. Dated

 05

.09.13

 for R

s. 100

 Lakhs

67/13‐14

 dated

 27.11

.201

3 for R

s. 100

 Lakhs 

20.11.20

14

EE(BC)3/20

15‐16 dated 09

.04.20

15

Sri V

arun

.A.K

41.48 % abo

ve ER

90,84,01

5

Rs.1,28,52

,064

/‐

12 m

onths

10.04.20

15

09.04.20

16

16.3.16

nil

Work completed

.

100%

130 Lakhs

Work inaugurated

DR/6

7

P.33

3,53

Kozhikod

e South

Kozhikod

e

Gen

eral Edu

catio

n Construction of building for 

Kundungal Govt. U.P. School in 

Kozhikode District 2013‐14

4202

‐01‐80

0‐88

 LAC

 ADF

 (NP)

50 Lakhs

GO(Rt) No. 370

2/13

 G. Edn

. Tvm

. Dated

 05.09

.13 

for R

s. 49.65

 Lakhs

DR/66/13

‐14 dated 27

.11.20

13 fo

r Rs.49

.65 Lakhs

9.6.20

15

EE(BC)38

/201

5‐16

 Dt.0

3.10

.15

T.Sathyan

39.60%

 abo

ve ER

44,58,12

7

6223

545

9 Mon

ths

11.11.20

15

10.08.20

16

Work completed

50%

30 Lakhs

64

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

8

P.33

2,41

Kozhikod

e South

Kozhikod

e

Gen

eral Edu

catio

n

Construction of building for 

Azhchavattom Govt. Higher 

Secondary School in Kozhikode 

District 2013‐14

60 Lakhs

GO(Rt) No. 370

0/13

 G. Edn

. Tvm

. Dated

 05

.09.20

13 fo

r Rs. 60 Lakhs

/62/13

‐14 dated 12

.11.20

13 fo

r Rs. 60 Lakhs

49% abo

ve E/R .

53.67.29

5

greemen

t to be

 executed. Old building to be 

demolish

ed

20 Lakhs

DR/

Ag

9

P.33

4,57

Kozhikod

e South

Kozhikod

e

Gen

eral Edu

catio

n

Construction of School building for Govt. UP School, Thiruvannur, Kozhikode

4202

‐01‐80

0‐88

 LAC

 ADF

 (NP)

25 Lakhs

GO(Rt) No. 132

2/20

15/ G

. Edn

. Tvm

. Da

ted 31

.03.20

15 fo

r Rs. 25 Lakhs

1085

/201

5‐20

16 dtd 11.09

.201

5 for 

25L

21.01.20

16

EE(BC)97

/201

5‐16

 dtd 22.02

.16

K Ba

sheer

10% abo

ve ER

2383

235

2621

558

9 Mon

ths

02.03.20

16

01.12.20

16

Finishing work in progress

25 Lakhs

65

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

10

P.33

4,58

Kozhikod

e South

Kozhikod

e

Gen

eral Edu

catio

n LAC‐ADS 2014‐15 Construction of 

School Building for Govt Girls HSS, Parayanchery in Kozhikode District 42

02‐01‐80

0‐88

50 Lakhs

GO(Rt) No. 207

7/20

15/ G

. Edn

. Tvm

. Dated

 28

.05.20

15 fo

r Rs. 50 Lakhs

DR‐829

/201

5‐16

 dt.0

7.08

.201

5 for 

52,250

,00/‐

EE(BC)67

/201

5‐16

 dtd 15.12

.15

Majeed K

9.39

% abo

ve E/R

5121

173

5602

052

12

19.12.20

15

18.12.20

16

Work completed

70%

20 Lakhs

G

11

Kozhikod

e South

Kozhikod

e

Gen

eral Edu

catio

n LAC‐ADS 2014‐15 Construction of 

School Building for Govt Ganapath UP 

School in Pokkunnu in 

Kozhikode District

4202

‐01‐80

0‐89

100 Lakhs

GO(Rt) No. 332

/201

6/ G. Edn

. Tvm

. Dated

 27.01

.201

6 for 

Rs. 100

 Lakhs

2526

/201

6‐17

 dt 1

7.9.16

 for R

s 99,99

,942

/‐ of E

E Bldgs 

Kkd

11.11.16

EE(BC0

110/20

16‐17 dated 18

.01.17

Shuh

aib M E

item ra

te

8953

707

7983

748

12 m

onths

Work to be Started.

66

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

12

Kozhikod

e South

Kozhikod

e

Gen

eral Edu

catio

n

LAC‐ADS ‐ 2015‐16 ‐ Construction of Laboratory class 

rooms for Parayanchery Girls Higher Secondary 

School in Kozhikode District

4202

‐01‐80

0‐88

‐LAC

 ADS

(NP)

25 Lakhs

G.O.(R

t) No. 351

/201

6/ G. Edn

. Tvm

. Dated

 28

.01.20

16 fo

r Rs. 25 Lakhs

1313

/201

6‐17

 dated

 02.07

.201

6 for R

s 25 

lakhs

9.09

.201

6

EE(BC)86

/201

6‐17

 dated

 21.10

.201

6

Prem

jith C

3.13

% abo

ve ER

2225

258

2155

607

6 mon

ths

Finishing stage

G 113

Kozhikod

e South

Kozhikod

e

Gen

eral Edu

catio

n

LAC‐ADS ‐ 2015‐16 ‐ Construction of school  building for 

Kallai Govt. Ganapath Higher Secondary School in Kozhikode 

District

200 Lakhs

GO(Rt) No. 210

0/20

16/ G

. Edn

. Tvm. D

ated

 01.07

.201

6 for R

s. 200

L

TS estim

ate un

der p

reparatio

n

67

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

14

Kozhikod

e South

Kozhikod

e

Gen

eral Edu

catio

nLAC‐ADS ‐ 2015‐16 ‐ Construction of school  building for Azhchavarttom Govt. Higher 

Secondary School in Kozhikode 

District

40 Lakhs

A.S. accorde

d

arted on

ly after com

pletion of groun

d flo

orCan be

 st

68

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

15

Kozhikod

e South

Kozhikod

e

Home

LAC‐ADS 2015‐16 ‐ Construction of Over Head Water Tank in Nagaram Police Quarters, in Kozhikode District 40

55‐00‐20

7‐97

20 Lakhs

7/16

/Hom

e dt.  09

.06.16

 for R

s.20

 Lakhs

ated

 02.07

.201

6 for R

s. 20 Lakhs o

f EE(B)KK

D

9.09

.020

16

BC)95/20

16‐17 dated 17

.11.20

16

Abdu

l Basith

.K.

10% abo

ve ER

1872

461

2059

707

6 mon

ths

Work to be Started.

Estim

ate subm

itted

 for A

.S

GO(Rt)18

8

1311

/16‐17

 da

EE(

16

P.29

8,12

5

Kunn

amangalam

Kozhikod

e

Gen

eral Edu

catio

n

Construction of building for Govt. 

High School Perumanna 

4202

‐01‐20

2‐99

 (NP)

100 Lakhs

GO(Rt)95

8/13

/G.Edn

. dt. Tvm. 27.02

.13 for 

Rs.100

 Lakhs

DR/2/201

3‐14

 dated

 06.04

.201

3 for R

s. 100

 Lakhs

EE(BC)10

/14‐15

 dt.2

7.06

.14

Sri. K. Bashe

er

42% abo

ve ER

92,10,82

1

1,30

,79,36

6

12 m

onths

1.7.20

14

30.6.201

5

Work completed

69

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

17

P.37

1,24

Kunn

amangalam

Kozhikod

e

Gen

eral Edu

catio

n

Mavoor H.S School building

4202

‐02‐80

0‐85

 (NP) LAC

 ADF

100 Lakhs

O(Rt)22

37/13/G.Edn

. Dated

 28.05

.13 for R

s. 

100 Lakhs

41/13‐14

 dated

 11.07

.201

3 for R

s.10

0 Lakhs

27.09.20

13

EE(BC)56

/201

3‐14

 dt.0

3.02

.14

M/s ASH

TEC

33.33%

 abo

ve ER. 

92,19,50

6

1,22

,92,36

7

12 m

onths

7.2.20

14

6.2.20

15

Work completed

35.94

GO

DR/

18

P.39

5,1

Kunn

amangalam

Kozhikod

e

Construction of Dialysis unit over existing Seminar Hall and OP Block at Cheruppa Health 

Centre, Calicut

4210

‐02‐10

3‐95

 (NP)

50 Lakhs

GO(Rt)13

17/H&SW

D dt. Tvm

. 11.04

.201

3 for 

Rs.50 Lakhs

DR/30/13

‐14 dated 10

.06.20

13 fo

r Rs. 50 Lakhs

20.2.201

5

EE(BC)55

/15‐16

 dtd 28.11

.201

5

Santho

sh Kum

ar K V

29.72%

 abo

ve E/R 

4505

498

5844

532

6 mon

ths

8.12

.201

5

7.6.20

16

 Work  com

pleted

100%

70

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

19

P.33

3,54

Kunn

amangalam

Kozhikod

e

Gen

eral Edu

catio

n Construction of School building for Kodal Nadakkavu Government UP 

School in Kozhikode District 

(2013‐14)

4202

‐01‐80

0‐88

 LAC

 ADF

 (NP)

50 Lakhs

O(Rt)37

01/201

3/G.Edn

. dt. Tvm. 05.09

.201

3 for R

s.50

 Lakhs

/64/13

‐14 dated 27

.11.20

13 fo

r Rs. 50 Lakhs

15.02.20

14

EE(BC) 29/20

14‐15 dt.04.11

.14

Sri. M.K. Kun

hamu

32% abo

ve ER

4518

569/‐

5964

511/‐

07.11.20

14

06.05.20

15

06.08.20

15

03.07.20

15

Work completed

.

100%

Final Bill Sub

mitted

.

GO

DR/

20

P.33

3,51

Kunn

amangalam

Kozhikod

e

Gen

eral Edu

catio

n

Construction of School building for GHSS, Iringallur in Kozhikode District 

(2013‐14)

4202

‐01‐80

0‐88

 LAC

 ADF

100 Lakhs

GO(Rt)37

04/201

3/G.Edn

. dt. Tvm. 05.09

.201

3 for R

s.10

0 Lakhs

DR/65/13

‐14 dated 27

.11.20

13 fo

r Rs. 100

 Lakhs

EE(BC)37

/201

5‐16

 dt.2

6.09

.15

M.P.Dasan

39.45%

 abo

ve E/R

9320

362

1299

7245

10 M

onths

09.11.20

15

Fin

ish

ing

stag

e

40%

50 Lakhs

Work Started

71

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

21

P.33

4,55

Kunn

amangalam

Kozhikod

e

Gen

eral Edu

catio

n Construction of School building for Kunnamangalam Govt. UP School, 

Manakkad(2013‐14)

4202

‐01‐80

0‐88

 LAC

 ADF

 (NP)

50 Lakhs

GO(Rt) No. 532

3/20

13/G

.Edn

. Dt. 

Tvm.07.12

.201

3 for R

s. 50 Lakhs

DR/86/13

‐14 dt 29.01

.14 for 

50Lakhs

EE(BC)21

/14‐15

 dt.1

4.10

.201

4

Sri Shaiju

 A.P

16.38 %above ER

43,56,32

7

50,69,89

3

8 Mon

ths

27‐09‐20

14

26‐05‐20

15

16‐03‐20

15

Work completed

 and

 Inaugurated.

vm 

r 25 

6.

22

P.33

4,56

Kunn

amangalam

Kozhikod

e

Gen

eral Edu

catio

n Construction of School building for Kunnamangalam Govt. LP School, Vallayannur(2013‐14)

4202

‐01‐80

0‐88

 LAC

 ADF

 (NP)

25 Lakhs

GO(Rt) No. 532

6/20

13/G

.Edn

.dt.T

07.12.13

 for R

s. 25 Lakhs

DR/87/13

‐14 dated 25

.01.20

14 fo

rLakhs

04.02.20

16

EE(BC)99

/201

5‐16

.dt.2

9‐02

‐201

Sri. Krish

nadasan.C

9.3%

 abo

ve ER

2314

253

2529

478

6 mon

ths

10.03.20

16

09.09.20

16

Wor

k co

mpl

eted

70%

23

Kunn

amang

alam

Kozhikod

e LAC‐ADF 2013‐14 Construction of Olavanna CHC Ward, Kozhikode 90

 Lakhs

Estim

ate 

subm

itted

 for A

.S

72

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

24

Kunn

amangalam

Kozhikod

e

Gen

eral Edu

catio

n

LAC‐ADF 2013‐14 Construction of new building for Govt. Higher 

Secondary School Peringolam at 

Peruvayal Grama Panchayat

100 Lakhs

GO(Rt)No.30

03/201

4/ G.Edn

 dt. Tvm. 

30.07.20

14 fo

r Rs.10

0 Lakhs

DR/45/14

‐15 dated 5.09

.201

4 for 1

00 

Lakhs

11.11.20

14

EE(BC)06

/201

5‐16

.dt.1

5‐05

‐201

5.

Sri Shaiju

 A.P

35% abo

ve ER

9853

214

1330

1839

12 M

onths

11.05.20

15

10.05.20

16

11.05.20

15

10.05.20

16

Work completed

.

100%

25

P.33

3,49

Kunn

amangalam

Kozhikod

e

Gen

eral Edu

catio

n

LAC‐ADS 2014‐15 Construction of Administrative Block building at Govt Arts & 

Science College at Chathamangalam in Kunnamangalam 

4202

‐01‐80

0‐88

325 Lakhs

GO(Rt)No.11

12/201

5/ G.Edn

 dt. Tvm. 21.05

.201

5 for 

Rs.325

 Lakhs

438/20

16‐17 dt 31.5.16

 of C

hief Enginne

r for 325

 lakhs

5.8.16

SE(K)38/20

16‐17 

dt.9‐09‐20

16

Sushanth E

item ra

te

2911

9331

2529

0756

12 m

onths

 Fou

ndation work in progress

73

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

26

Kozhikod

e North

Kozhikod

e

Gen

eral Edu

catio

nMedical College 

Campus Govt. High School 22

5 Lakhs

O(Rt)30

53/201

3/G.Edn

 dt. Tvm. 23.07

.201

3 for R

s.22

5 Lakhs

R/26

/201

3‐14

 dt.1

0.12

.13  fo

r Rs. 225

 Lakhs

SE(K)17/20

14‐15 

dt.30‐09

‐201

4

M/s ULCCS

 Ltd.

20% abo

ve ER

2125

8383

2551

0060

12 m

onths

30.08.20

14

29.08.20

15

Nil

29.08.20

15

Work completed

100%

Work completed

. final bill und

er preparatio

n

GO CR W

74

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

27

Kozhikod

e North

Kozhikod

e

LAC ADF ‐Construction of dormitory for Bystanders of 

patients in Govt. Medical College 

Hospital, Kozhikode

157 Lakhs

&FW

D dt. Tvm

. 10.06

.201

3 for R

s.15

7 Lakhs

1.20

14 of the

 SE, Kozhikode

 for R

s.16

0 Lakhs

19/201

4‐15

 dt.0

4.10

.201

4

M/s ULCCS

 Ltd.

25% abo

ve ER

1495

7570

1869

6963

18 m

onths

14‐10‐20

14

Work completed

.

Hospital, Kozhikode

GO(Rt)20

02/201

3/ H&

CR/38/20

13‐14 dt. 23.1

SE(K)1

28

Kozhikod

e North

Kozhikod

e

Gen

eral Edu

catio

n

Construction of building for 

Puthiyangadi Govt L.P School

4202

‐02‐80

0‐85

 (NP)

125 Lakhs

GO(Rt)20

33/201

3/G.Edn

 dt. Tvm. 

14.05.20

13 fo

r Rs.12

5 Lakhs

CR/39/20

13‐14 dt.28.01

.201

4 for 

125L

SE(K)54/20

14‐15 dt.31‐03

‐201

5

M/s ULCCS

 Ltd.

31.55 %above E/R

1136

9308

1495

6325

18  m

onths

10.04.20

15

09.10.20

16

Work ne

aring completion.

80%

75

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

29

P.33

3,46

Kozhikod

e North

Kozhikod

e

Gen

eral Edu

catio

n

LAC ADF  Construction of Toilet block for Girls & Boys, 

Basket ball Court, Compound wall,stage, 

Extension to new building for HSS 

and HS for Govt.HighSchool Karaparamba

4202

‐01‐80

0‐88

  LAC

 ADS

 (NP)

200L

(Rt)No.41

98/201

4/G.Edn

. dt.1

6.10

.201

4 for 

200 L

CR/28/20

14‐15 dt.11.02

.201

5  fo

r Rs. 200

 Lakhs

27.03.20

15

SE(K)30/20

15‐16 dt.18‐09

‐201

5

M/s ULCCS

 Ltd.

35 %above E/R

1852

6727

2501

1082

18 m

onths

28.09.20

15

27.03.20

17

work ne

aring completion.

65%

100.L

GO C

30

Kozhikod

e North

Kozhikod

e

Gen

eral Edu

catio

n

LAC ADF ‐Construction of building for GHSS East Hill  Kozhikode

4202

‐01‐80

0‐88

  

50 Lakhs

GO(Rt)No.22

97/201

4/G.Edn

. dt.11.06

.201

4 for 5

0 L

3560

/201

5‐16

 dtd 24.02

.201

6 for R

s 50

L

11.03.20

16

EE(BC)06

/201

6‐17

 dated

 01.06

.201

6

Sajith P

6% below

 ER

4548

881

4275

948

10 M

onths

Finishing Work in progress

76

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

31

Kozhikod

e North

Kozhikod

e

LSGD

LAC ADF ‐Construction of Mini Stadium Chelavoor  Kozhikode

8443

‐00‐10

8‐PW

 Dep

osit

25 Lakhs

GO(Rt)32

64/ 2

014/LSGD for 

Rs.25 Lakhs

229/20

15‐16 dt 16.06

.15 for 

25L

30.09.20

15

EE(BC)78

/201

5‐16

 dtd 13.1.16

M/s ULCCS

 Ltd.

30%  abo

ve Estim

ate Ra

te

2243

495

2675

816

6 mon

ths

22.01.20

16

21.07.20

16

Work completed

45%

32

ozhikode

 North

Kozhikod

e LAC ADF ‐Construction of 

Modernized Toilet i h hik d bm

itted

 for 

A.S

Ko K in Beach Kozhikode

Sub

33

P.33

5,71

Kozhikod

e North

Kozhikod

e

Gen

eral Edu

catio

n

LAC ADF ‐Construction of Building for GLPS Chelavoor in 

Kozhikode District

4202

‐01‐80

0‐88

 Project und

er LAC

‐ADS

 (NP)

25 Lakhs

GO(Rt) No.33

63/201

5/G.Edn

 dtd. Tvm

. 11.08

.201

5 for R

s.25

 Lakhs

3831

/201

5‐16

 dated

  02.03

.201

6       for R

s. 25 

Lakhs.

03.08.20

16

EE(BC)75

/201

6‐17

 dated

 23.09

.201

6

K Ab

dul Basith

5.13

% below

 ER

2398

026

2275

007

8 Mon

ths

Work to be Started.

77

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

34

Kozhikod

e North

Kozhikod

e

Gen

eral Edu

catio

nLAC ADS ‐

Construction of Building for GUPS 

Vellayil in Kozhikode District

4202

‐01‐80

0‐88

 LAC

 ADS

(NP)

25 Lakhs

G.O.(R

t)No.34

94/201

5/Ged

n dtd 20

/8/201

5

832/20

15‐16 dated 02

.03.20

16 fo

r Rs. 25 

Lakhs.

30.08.20

16

EE(BC)85

/201

6‐17

 dated

 18.10

.201

6

Santho

sh Kum

ar K V

5.60

% below

 ER

2346

978

2215

547

8 Mon

ths

Agt. Executed

. Work to be started after 

demolish

ing old bu

ilding

38

A

35

Kozhikod

e North

Kozhikod

e

Gen

eral Edu

catio

n

LAC ADF ‐Construction of Permanent Stage, 

Gallery and Compound Wall with Gate at Govt. 

High School, Medical College 

Campus in Kozhikode District

4202

‐01‐80

0‐88

50 Lakhs

GO(Rt) No.54

64/201

5/G.Edn

 dtd TVM

 20

.11.20

15 

3784

/201

5‐16

 dated

 01.03

.201

6  fo

r Rs. 50 

Lakhs.

03.08.20

16

EE(BC)78

/201

6‐17

 dtd 23.09

.16

Abdu

l Basith

.K.

8.3%

 below

 estim

ate rate

44,90,95

1

41,18,20

2/‐

8 mon

ths

Work Started.

78

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

36

Kozhikod

e North

Kozhikod

e

LAC ADF‐ Construction of 

internal road,walkways and 

providing landscaping at cremetorium at Mavoor Road Kozhikode

50 Lakhs

Estim

ate Subm

itted

 for A

.S.

AC ADS

 201

5‐16

dated Tvm 

e received

37

Kozhikod

e North

Kozhikod

e

LAC‐ADS ‐ Construction of class room for Govt. U.P School Bilathikulam, Kozhikode.

4202

‐01‐80

0‐88

‐Projects u

nder LA

50Lakhs

G.O.(R

t)No.32

05/201

6/G.Edn

 d01

.10.20

16

AS obtaine

d. TS estim

ate to b

79

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

38

Kozhikod

e North

Kozhikod

e

Health and

 Fam

ily W

elfare

LAC ‐ ADS ‐ Construction of New Building for OP Block at Govt. General Hospital, 

Kozhikode

4210

‐02‐80

0‐95

(01)‐Projects u

nder LAC

 ADS

 

37Lakhs

G.O.(R

t) No.23

04/201

6/H&

FWD dated Tvm 

19‐08‐20

16 

As obtaine

d. TS estim

ate to be subm

itted

 after d

iscussio

n with

 MLA

4 G

39

Kozhikod

e North

Kozhikod

e

LAC‐ADS ‐ Construction of Canteen block at Govt. General 

Hospital, Kozhikode Beach

4210

‐02‐80

0‐95

(01)‐Projects u

nder LAC

 ADS

 

65 Lakhs

GO(Rt) No. 221

3/20

16/H&FW

D dated Tvm     

        10‐08

‐201

As obtaine

d. TS estim

ate to be subm

itted

 after d

iscussio

n with

 MLA

80

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

40Ko

zhikod

e North

Kozhikod

e

Gen

eral Edu

catio

n LAC‐ADS ‐ Construction of new building for Govt. High School, Medical College 

Campus, Kozhikode 4202

‐01‐80

0‐88

100 Lakhs

GO(Rt) No. 893

/201

6/G 

Edn dated 1.3.20

16

Ten

dere

d

0 dy de catio

n

Construction of  nder LAC

‐ADS

 (NP)

hs G.Edn

 dated

 Tvm

 14

0 Lakhs

2014

 Rs.14

0 Lakhs

14 dt.31.3.20

15

S Ltd

ove

61 12 hs 15 16 leted.

41

P.33

5,70

Koyiland

Kozhikod

Gen

eral Edu

c

school bldg for HS classes in GVHSS Payyoly at Thikody

4202

‐01‐80

0‐88

 Project u

140 Lakh

GO(Rt)No 47

28/201

3 G

20.11.13

 for R

s. 

CR/14/20

13‐14 Dt.4‐8‐ 2

18.9.201

SE(K)56/20

14‐15 d

M/s ULCCS

22.57%

 ab

1301

706

1595

501

18 m

onth

04.04.20

03.10.20

Work comp l

160L

42

Koyiland

y

Kozhikod

e

Gen

eral Edu

catio

n

Construction of Mr. V.R. Krishna Iyyer Block (New Block) in GVHSS 

Koyilandy

250 Lakhs

GO(Rt)13

41/13/G.Edn

. dt. 

Tvm. 21.03

.13 for R

s.25

0 Lakhs

CR/23/20

13‐14 dt. 30.11

.201

3

12.02.20

14

SE(K)18/20

14‐15 

dt.04.10

.201

4

M/s ULCCS

 Ltd

30 % abo

ve ER

2165

2755

2814

8582

15 m

onths

01.09.14

9.12

.15

30.11.15

Work completed

.

1625

3033

281.50

L

81

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

43

Koyiland

y

Kozhikod

e Construction of new Building Complex for 

Koyilandy Court 

4059

‐60‐05

1‐72

100 Lakhs

O(Rt)12

89/13/Ho

me dt. Tvm

. 13.05

.13 for 

Rs.100

 Lakhs

04/15‐16

 dated

 08.07

.201

5 for R

s.10

0 Lakhs

15.01.20

16

EE(BC)18

/201

6‐17

 Dt.0

4.06

.16

M/s ULCCS

 Ltd

15.91%

 abo

ve Er

9093

332

1054

0081

12 m

onths

Work completed

100%

GO

DR/

44

P.33

4,62

Koyiland

y

Kozhikod

e

Gen

eral Edu

catio

n

Construction of new Block for GHSS (Girls), Koyilandy

4202

‐01‐80

0‐88

 Project und

er LAC

‐ADS

100 Lakhs

GO(Rt)24

90/201

4/G.Edn

. dt. 24

.06.20

14 fo

r Rs. 100

 Lakhs

DR/21/14

‐15 dt. 09.07

.201

4 for R

s. 100

 Lakhs

EE(BC)08

/201

5‐16

 dt.2

3.05

.201

5

Sri.S.Selvaraj

37.76%

 abo

ve ER

9093

265

1252

6882

12 m

onths

Work completed

`

125.25

L

82

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

45

Koyiland

y

Kozhikod

e

Construction of building for Ayurveda 

Dispensary at Muchukunnu, Koyilandy

‐02‐80

0‐95

 Project und

er LAC

‐ADS

25 Lakhs

9/20

14/H&FW

D dated 21

.07.20

14 fo

r Rs. 25 

Lakhs

14‐15 dt 30.08

.201

4 for R

s 25 lakhs

10.12.20

14

E(BC

)96/20

16‐17 dt.17.11

.201

6

odadi labou

r Con

tract C

o‐op

erative Society

31.14%

 abo

ve ER

2385

375

3128

181

6 mon

ths

Work started

4210

GO(Rt)No.24

59

39/20 EE

Presiden

t,Mo

46

P.33

2,40

Koyiland

y

Kozhikod

e

Gen

eral Edu

catio

n

Construction of new building for Govt. Mappila VHSS, Koyilandy

4202

‐01‐80

0‐88

100 Lakhs

GO(Rt) No. 111

5/20

14/G

.Edn

 dt. Tvm 

01.03.20

14 fo

r Rs.10

0 Lakhs

DR/05/20

14‐15 Dt.22.05

.201

4 Rs.100

 Lakhs

EE(BC)33

/201

5‐16

 dt.1

1.09

.201

5

M/s M

oodadi Labou

40% abo

ve ER

9115

465

1276

1651

12 m

onths

Work completed

.

75%

30L

83

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

47

P.40

8,44

Koyiland

y

Kozhikod

e Construction of PH Sub Centre, Puliyanchery

4210

‐02‐80

0‐95

‐LAC

‐ADS

(NP)

25 Lakhs

GO(Rt)No.23

16/14 H&

FWD Dt.8.07.14

 for R

s.25

 Lakhs

DR/36/20

14‐15 D2

2/08

/201

4 Rs.25  

Lakhs

EE(BC)35

/201

5‐16

 dt.1

8.09

.201

5

Sri.S.Selvaraj

33.37%

 abo

ve ER

23,93,80

4/‐

31,92,61

6/‐

4 mon

ths

Work completed

.

20L

DS L48

P.37

1,26

Koyiland

y

Kozhikod

e Construction of Workshop for ITI, 

Koyilandy

4202

‐02‐80

0‐85

‐Projects u

nder LAC

‐AD

30 Lakh

GO(Rt) No. 115

1/20

14/LBR

 dt. Tvm 

22.08.20

14 fo

r Rs.30

 Lakhs

DR/47/14

‐15 dtd 26

.9.201

4 for R

s 30 L

EE(BC)53

/201

5‐16

 dt.2

8.11

.201

5

K.Ba

sheer

40.56%

 abo

ve E/R

2834

232/‐

3983

796/‐

6 mon

ths

Work completed

50%

15L

84

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

49

Koyiland

y

Kozhikod

eConstruction of Crematorium building in 

Chamanchery Grama Panchayath 

in Kozhikode District

8443

‐00‐10

8‐PW

 Dep

odit

40 Lakhs

GO(Rt) No. 172

4/20

15/LSG

D dt. Tvm

 09

.06.20

15 fo

r Rs.40

 Lakhs

768/20

15‐16 dt 31.07

.201

5 for R

s 44 

lakhs

20.11.20

15

EE(BC)19

/201

6‐17

 dt 4

.06.20

16

ULCCS

15.54%

 abo

ve Er

4043

091

4671

387

9 Mon

ths

Work completed

60%

20L

50

P.33

4,59

Koyiland

y

Kozhikod

e

Gen

eral Edu

catio

n

Construction of new block for 

Kothamangalam GLP School

4202

‐01‐80

0‐88

25Lakhs

GO(Rt)No.20

80/201

5/G.Edn

 dt.28.05

.15 Rs.25 Lakhs.

1689

/201

5‐16

 dated

 21.11

.201

5 for 

25L

29.1.16

EE(BC)13

/201

6‐17

 dt 2

.06.20

16

N.P. Salinesh

9.1%

 abo

ve E/R

2285

501

2493

482

6 mon

ths

Nearin

g Co

mpletion

35%

85

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

51

Koyiland

y

Kozhikod

e Construction of Veterinary Hospital 

Koyilandy 75 Lakhs

cancelled

ding

 with

 Mun

icipality

 for w

ant o

f Site

 plan

Pen

52

Koyiland

y

Kozhikod

e Construction of Ayurveda Dispensary Puliyanchery 40

 Lakhs

Estim

ate 

subm

itted

 for A

.S.

53

Koyiland

y

Kozhikod

e

LAC‐ADS 2015‐16 Infrastructure development ‐ Construction of entrance block, Open theatre and Basket ball court for SARBTM Govt: college, Koyilandy.

4202

‐01‐80

0‐88

53 lakhs

GO(Rt) No.62

5/20

16/H

 Edn

 dtd Tvm

 02‐

03‐201

6

477/20

16‐17 dated 02

.06.20

16 fo

r Rs 

53L

EE(BC)32

/201

6‐17

 Dt.2

0‐6‐16

ULCCS

Estim

ate Ra

te

5054

140

5054

140

9 mon

ths

Nea

rin

g C

ompl

etio

n

86

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

54

Kuttiady

Kozhikod

e

Gen

eral Edu

catio

n Construction of building for Govt. 

U.P. School, Pyngottayi in Thiruvallur Panchayath 42

02‐01‐20

1‐99

(NP)

25 Lakhs

AS No. GO(Rt)12

59/13/G.Edn

. dt. Tvm. 

16.03.13

 for R

s.25

 Lakhs

DR/22/13

‐14 dated 17

.05.13

 for R

s. 25 Lakhs

EE(BC)11

/201

4‐15

 Dt.2

8‐6‐14

Sri. K.P. Chand

ran

23,95,04

4

3041

706

6 mon

ths

03.07.20

14

02.01.20

15

Work Co

mpleted

.

D

55

P.33

5,69

Kuttiady

Kozhikod

e

Gen

eral Edu

catio

n

Construction of  building for 

Maniyoor School

4202

‐01‐80

0‐88

‐Projects u

nder LAC

‐ADS

(NP)

50 Lakhs

GO(Rt ) 324

7/20

14/ G

.Edn

 dt. 13

.08.20

14 fo

r Rs.50 Lakhs

DR‐52/14

‐15 dated 13

.10.20

14 fo

r Rs. 50 

Lakhs

10.6.201

6

EE(BC)57

/201

6‐17

 dtd 08.08

.201

6

Sri. K.P. Chand

ran

25.45%

 abo

ve ER

4860

470

6097

460

9 Mon

ths

Work started

87

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

56

Kuttiady

Kozhikod

e Construction of Dialysis Centre for Taluk Hospital, 

Kuttiady 100 Lakhs

Estim

ate subm

itted

for A

.S.

or AS un

der LAC

 ADF

 pen

ding

 at C

E's o

ffice)

(Estim

ate fo

57

Kuttiady

Kozhikod

e

Gen

eral Edu

catio

n

Construction of building for Govt. U.P. School, Vattoli in Kunnummal Panchayath

4202

‐01‐20

1‐99

(NP)

50 Lakhs

 GO(Rt)90

9/13

/G.Edn

. dt. Tvm. 23.02

.13 for 

Rs.50 Lakhs

DR/61/12

‐13 dated 27

.03.13

 for R

s. 50 Lakhs

EE(BC)34

/201

3‐14

 Dt.2

4‐10

‐13

Sri. K.P. Chand

ran

At Estim

ate Ra

te

4396

354

4396

354

6 mon

ths

30.10.20

13

29.04.20

14

Work completed

31.45

88

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

58

Vatakara

Kozhikod

e

Construction of Multi purpose Stadium at 

Narayananagaram, Vatakara

4515

‐00‐80

0‐96

(NP)

344 Lakhs

O(Rt)12

64/13/LSGD dt. Tvm

. 13.05

.13 for 

Rs.344

 Lakhs

CE/BL/ 201

3‐14

 dt. 07

.01.14

 for R

s.34

4 Lakhs

SE(K)32/20

14‐15 Dt.13‐11

‐14

M/s ULCCS

 Ltd.

3300

1452

4587

2018

12 m

onths

25.04.20

15

24.04.20

16

Work completed

.

1835

6854

275.16

GO

56/C

59

P.29

8,12

8

Vatakara

Kozhikod

e

Gen

eral Edu

catio

n

Construction of Chorode GHSS 

building, Vatakara

4202

‐01‐20

2‐99

(NP)

50 Lakhs

GO(Rt)95

0/13

/G.Edn

. dt. Tvm. 27.02

.13 for 

Rs.50 Lakhs

DR/7/13‐14

 dated

 11.04

.13 for R

s. 50 Lakhs

EE(BC)65

/201

3‐14

 Dt.2

4‐02

‐14

M/s ULCCS

 Ltd.

35 % abo

ve ER

49,01,95

5

6617

639

6 mon

ths 

04.03.20

14

03.09.20

14

Work completed

89

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

60

Vatakara

Kozhikod

e

Gen

eral Edu

catio

nConstruction of new block for GHSS Puthoor, 

Vatakara

4202

‐01‐20

0‐99

(NP)

50 Lakhs

GO(Rt)96

9/20

13/G

.Edn

. dt. Tvm. 

27.02.20

13 fo

r Rs.50

 Lakhs

DR/21/13

‐14 dated 09

.05.13

 for R

s.50

 Lakhs

EE(BC)64

/201

3‐14

 Dt.2

4‐02

‐14

M/s ULCCS

 Ltd.

33.91%

 abo

ve ER

4457

513

5969

056

6 mon

ths 

03.03.20

14

02.09.20

14

Work completed

61

P.33

5,67

Vatakara

Kozhikod

e

Gen

eral Edu

catio

n

Construction of  building for JNMM School, Pudupanam 

4202

‐01‐80

0‐88

‐(NP)

50 Lakhs

GO(Rt)No.51

12/201

4/G.Edn

. dt. Tvm. 

19.11.20

14 fo

r Rs.50

 Lakhs

1855

/201

5‐16

 dt 3

.12.20

15 fo

r Rs 5

0 lakhs

29.01.20

16

EE(BC)20

/201

6‐17

 dt )4/06

/201

6

M/s ULCCS

 Ltd.

10% abo

ve ER

4936

480

5430

128

9 Mon

ths

Work completed

80%

62

Vatakara

Kozhiko Construction of  

building for Fisheries School 50

 Lakhs

A.S. 

obtained

63

Vatakara

Kozhikod

e Construction of  building for Govt. 

Sanscrit HSS Vatakara. 40

 Lakhs

Estim

ate 

unde

r prep

aration

90

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

64

P.33

2,42

Vatakara

Kozhikod

e

Gen

eral Edu

catio

n

Construction of School building for K.  Kunhiraman Kuruppu School 

Eramala. 4202

‐01‐80

0‐88

50 Lakhs

GO(Rt )No. 396

4/20

14/ G

.Edn

 dt. 04.10

.201

4 for R

s.50

 Lakhs

1716

/201

5‐16

 dt 2

3.11

.201

5

29.01.20

16

EE(BC)17

/201

6‐17

 Dt.0

4.06

.16

ULCCS

10% abo

ve ER

4832

667

5315

934

9 Mon

ths

Work completed

e

Construction of Stadium at 

s SGD dt. Tvm

. 7.00

 Lakhs

gress

65

P.33

5,68

Vatakara

Kozhikod

e Narayana Nagaram Vatakara (Phase II Part (A) curved end portion, Pavilion on Western side.

187 Lakhs

GO(Rt)No.19

44/15/LS

26.06.15

 forRs. 187

Work in prog

20%

50L

66

Vatakara

Kozhikod

e

Gen

eral Edu

catio

n

Construction of   new block for 

GVHSS,  Madappally 

4202

‐01‐80

0‐88

‐(NP)

100 Lakhs

GO(Rt )No. 244

7/20

15/ G

.Edn

 dt. 19.06

.201

5 for R

s.10

0 Lakhs

KKD/20

15‐201

6/20

15/ 2

508

16.10.20

15

EE(BC)74

/201

5‐16

 dtd 

1.1.20

16

M/s ULCCS

 Ltd

9% abo

ve E/R

9802

586

1068

4818

9 Mon

ths

Work completed

.

75L

91

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

67

Vatakara

Kozhikod

e

Gen

eral Edu

catio

nConstruction of  

Compound wall for Ladies Hostel at Govt College, Madappally 

4202

‐01‐80

0‐88

‐LAC

 ADS

25Lakhs

GO(Rt )No. 631

/201

6/ H.Edn

 dt. Tvm 

02.03.20

16 fo

r Rs.25

 Lakhs

0/20

16‐17 dated 06

.08.20

16 fo

r Rs 2

5 lakhs.

09.09.20

16

EE(BC)84

/201

6‐17

 dated

 17.10

.201

6

K.T.K.Ra

ghun

ath

5.23

% below

 ER

2290

910

2171

095

6 mon

ths

Work completed

200

68

Perambra

Kozhikod

e

Health and

 Fam

ily W

elfare

Construction of Ayurveda 

Dispensary at Keezhariyoor, Koyilandy 4202

‐01‐20

2‐99

25 Lakhs

GO(Rt)15

42/201

3/H&

FWD dt. Tvm

. 04

.05.20

13 fo

r Rs.25

 Lakhs

DR/49/13

‐14 dated 03

.08.20

13 fo

r Rs.25

 Lakhs

17.10.20

13

EE(BC)58

/201

3‐14

 dt.7

‐2‐14

ULCCS

 Ltd.

17.5% abo

ve ER

23,69,86

9

2784

596

3 mon

ths

23.05.20

14

22.08.20

14

31.12.20

14

23.12.20

14

Work completed

92

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

69

P.40

9,50

Perambra

Kozhikod

e Dialisis Centre for Taluk Hospital, 

Perambra

4210

‐02‐80

0‐95

100 Lakhs

GO(Rt)15

49/201

3/H&

FWD dt. Tvm

. 04

.05.20

13 fo

r Rs.10

0 Lakhs

DR/32/13

‐14 dated 14

.06.13

 for R

s.10

0 Lakhs

EE(BC)21

/201

3‐14

 dt.1

3.8.13

Sri.  M

. Premarajan

6.33

% below

  E/R 

84,57,98

9

7922

598

12 m

onths

20.08.20

14

19.08.20

15

Work completed

37.47

53.72L

D

70

P.40

7,37

Perambra

Kozhikod

e Construction of First floor of 

Primary Health Centre, Meppayyur

4210

‐02‐80

0‐95

‐Projects u

nder     LAC

‐ADS

(NP)

100 Lakhs

GO(Rt)No.32

52/201

4/H&

FWD dt. Tvm

. 1.10

.201

4 for R

s.10

0 Lakhs

DR/75/20

14‐15 Dt.06.11

.201

4 Rs.100

 lakhs

Ee(BC)22

/201

5‐16

 dt.1

2.8.15

Sri.Salinesh

19.45%

 abo

ve E/R 

9415

772

1124

7140

18 m

onths

 80%

 of w

ork completed

90%

60L

71

Perambra

Kozhikod

e Construction of building for 

Primary Health centre Arikkulam 10

0 Lakhs

Work to be 

Started.

93

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

72

P.33

3,47

Perambra

Kozhikod

e

Gen

eral Edu

catio

n Construction of a building for Government 

Vocational Higher Secondary School, 

Meppayyur 4202

‐01‐80

0‐88

100 Lakhs

GO (R

t) No.36

42/201

5/Ged

n Dt.26.08

.15 

for R

s.10

0 Lakh

3559

/201

5‐16

 dt 2

4.02

.201

6 for R

s 100

 lakhs

26.06.20

16

EE(BC)79

/201

6‐17

 dt 2

3.9.20

16

ULCCS

4% abo

ve ER

8994

948

9354

747

12 M

onths

work started (ULCCS)

73

Perambra

Kozhikod

e

MLA LAC‐ADF 2013‐14 ‐ 

Renovation work & construcion of open air stage & sports pavilion in Chakkittapara GP, 

Perambra in Kozhikode

99 Lakhs

GO(Rt)No.96

/14/S&

YA  dated

 22/05

/201

4 for 

Rs.99 Lakhs.

DR‐48/20

14‐15 dated 07

.10.20

14 fo

r Rs. 99 Lakhs

31‐12‐20

14

EE(BC)64

/201

4‐15

 dt.2

4.02

.15

Mr.S

adanandan A.K

0.53

% below

 ER

9775

472

9723

662

12 m

onths

03‐03‐20

15

Work completed

95%

96L

94

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

74

P.40

9,49

Nadapuram

Kozhikod

e

Health and

 Fam

ily W

elfare

Construction of building for 

Community Health Centre, Valayam

4210

‐02‐80

0‐95

(NP)

200 Lakhs

GO(Rt)15

30/13/H&

FWD dt. 

Tvm.03.05

.13 for R

s.20

0 Lakhs

CR/19/20

14‐15 dt.29‐9‐14

SE(K)57/20

14‐15 Dt.31‐3‐15

M/sULCCS

1822

1343

2363

6728

18 M

onths

Work started.

10%

3.02

.13 for 

for R

s.15

.201

4

75

P.29

9,13

3

Nadapuram

Kozhikod

e

Higher Edu

catio

n

Construction of building for Govt. Higher Secondary School, Velliyod, 

Nadapuram

4202

‐01‐20

‐99(NP)

150 Lakhs

GO(Rt)89

9/13

/H.Edn

 dt. Tvm.23

Rs.150

 Lakhs

CR/32/20

13‐14 dt. 31.12

.201

3 f

Lakhs

20.2.201

4

SE(K)20/20

14‐15 Dt.04.10

.

M/s ULCCS. 

50% abo

ve ER‐

1383

8213

2075

7320

15 M

onths

04.09.20

14

03.12.20

15

11.9.201

5

nil

Work completed

9834

450

110L

95

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

76

Nadapuram

Kozhikod

e

Higher Edu

catio

nConstruction of new building for Govt. College, Nadapuram

4202

‐01‐80

0‐88

500 lakhs

G.O.(R

t)No.57

0/20

16/HEdn dtd 25

.02.16

436/20

16‐17 dated 30

.05.20

16 fo

r Rs 5

00 

lakhs

SE(K)21/20

16‐17 dated 10

.06.20

16

ULCCS

 Ltd.

Estim

ate Ra

te

4703

4368

4703

4368

24 m

onths

Wor

k st

arte

d

Desig

n pe

nding

4

77

Thiru

vambady

Kozhikod

e

Gen

eral Edu

catio

n

Construction of new building for Govt. High School at Cheruvady in 

Kodiyathur

4202

‐01‐20

2‐99

. Secon

dary Schoo

l Bud

get (NP)

67 Lakhs

GO(Rt)17

05/201

3/PW

D. dt. Tvm. 23.02

.201

3 for R

s.67

 Lakhs

DR/4/13‐14

 dated

 08.04

.13 for R

s.67

 Lakhs

EE(BC)52

/13‐14

 dt.3

1.1.14

Sri. Majeed K

8% abo

ve ER

66,99,74

2

72,35,72

1

9 Mon

ths

14.02.20

14

13.11.20

14

31.03.20

15

25.03.20

15

Work completed

.

100%

96

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

78

P.33

7,80

Thiru

vambady

Kozhikod

e

Gen

eral Edu

catio

n Construction of first& Second floor (One class room in 

each floor) to existing building 

for Chullikkaparamba.

4202

‐01‐80

0‐88

25 Lakhs

GO(Rt) 966

/201

3/G.Edn

.Dated

.30.9.20

15 

for 2

5 Lakhs 

2084

/201

5‐16

 dated

 16.12

.15for Rs.25

 Lakhs

11.03.20

16

EE(BC)21

/201

6‐17

 dated

 07.06

.201

6

Peop

le W

elfare Sahakarana Sangam

 Ltd.

2% abo

ve ER

2347

109

2394

051

8 Mon

ths

Work completed

79

Thiru

vambady

Kozhikod

e

H.Education Construction of 

building for College of Applied Science (IHRD)‐ Karasssery

4202

‐01‐20

3‐99

 (NP)

100 Lakhs

GO(Rt)61

6/20

13/H.Edn

. dt. Tvm. 16.04

.201

3 for R

s. 100

 Lakhs

DR/26/13

‐14 dated 06

.06.13

 for R

s.10

0 Lakhs

21.08.20

13

EE(BC)42

/201

3‐14

 dtd 27.12

.13

ASHT

EC Con

tractors Pvt. Ltd

8.45

% abo

ve E/R

87,83,57

3/‐

95,25,78

5/‐

12 M

onths

26.12.20

13

25.12.20

14

30.09.20

15Extension  up to 30‐09

‐201

5.

Work completed

.

100%

To be started

60.L

97

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

80

Thiru

vambady

Kozhikod

e

LSGD Construction of 

Community Hall at Koodaranhi

4515

‐00‐80

0‐96

 LAC

 ADS

 (NP)

70 Lakhs

GO(Rt)No.19

96/201

4/LSGD. dt. 

Tvm. 01.08

.201

4 for R

s.70

 Lakhs

DR‐37/14

‐15 dt 22.8.20

14 fo

r 70

L

6.08

.201

5

EE(BC)88

/201

5‐16

 dtd 8.02.16

Shaiju.A.P

19.86%

 abo

ve ER

6849

357

8209

639

9 Mon

ths

18.02.20

16

17.11.20

16

Work to be started.

‐ADS

 (NP)

dt.TVM

 

s.35

 Lakhs

16

81

P.40

8,45

Thiru

vambady

Kozhikod

e

Health and

 Fam

ily W

elfare

Construction of  building for Sub Centre, Adivaram, 

Puthupady Panchayath

4210

‐02‐80

0‐95

‐ Projects u

nder LAC

35 Lakhs

GO(Rt) No. 161

2/20

14 / H&

FWD d

20.05.14

 for 3

5 Lakhs

DR/41/14

‐15 dated 05

.09.20

14 fo

r R

7.10

.201

5

EE(BC)81

/201

6‐17

 dtd 3.10.1

Jobish.K.E

29.63%

 abo

ve ER

3282

371

4254

938

6 mon

ths

Agreem

ent e

xecuted

98

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

82

Thiru

vambady

Kozhikod

e

LSGD

Construction of  Addl. Amenities to 

Bus stand, Eengapuzha in 

Puduppady Grama Panchayath

Projects und

er LAC

‐ADS

(NP) (D

eposit Work)

45 Lakh

20/201

4 / L

SGD dt 03.03

.14 for 4

5 Lakhs

3/14

‐15 dt 26‐4‐14

 for 4

5 Lakhs

E(BC

)30/20

15‐16 Dt.26.08

.15

Jobish.K.E

31.01%

 abo

ve ER

4486

393

5877

623

9 Mon

ths

09‐08‐20

15

07.06.20

15

Work completed

45  Lakhs

4515

‐00‐80

0‐96

 P

GO(Rt) No. 62

DR/3 EE

99

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

83

P.40

8,46

Thiru

vambady

Kozhikod

e

Health and

 Fam

ily W

elfare

Construction of IP Block building in CHC, Kodenchery

‐800

‐95‐Projects und

er LAC

‐ADS

 (NP)

60 Lakhs

5/20

14/H&FW

D dt. Tvm

. 13.06

.201

4 for R

s. 

60 Lakhs

/14‐15

 dt. 30

.06.14

 for R

s. 60 Lakhs

11.8.201

5

E(BC

)85/20

15‐16 dt 4.2.201

6

form

s & Develop

men

t Co‐op

erative Society 

28.78%

 abo

ve E/R

5718

733

7364

584

12 m

onths

12.02.20

16

11.02.20

17

Work completed

4210

‐02‐

GO(Rt) No. 195

5

DR/19/ E

Kerala Land Re

f84

Thiru

vambady

Kozhikod

e

LSGD

Construction of Kudumbasree Skill Development 

Centre, Valliyodu in Puthupadi 

Grama Panchayat

8443

‐00‐10

8‐ PWD De

posit W

ork

60 Lakhs

GO(Rt)No.20

50/201

4/LSGD Dt.7.8.14 

for 6

0 Lakhs

DR‐734

/14‐15

 Dt.0

6.11

.14 for R

s.60

 Lakh

EE(BC)40

/201

5‐16

 Dt.1

7.11

.15

Ajay .T

2.10

% Below

 ER

5222

544

5112

870

12 M

onths

27.02.20

16

26.02.20

17

Work in progress

10%

100

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

85

P.33

4,64

Thiru

vambady

Kozhikod

e

Gen

eral Edu

catio

n Construction of new building for  Govt. Tribal LP 

School, Koompara in Koodaranhi Panchayat

202‐01

‐800

‐88 Projects und

er LAC

‐ADS

 (NP)

60 Lakhs

GO(Rt) No. 118

4/20

14/G

.Edn

. Dt. Tvm. 

04.03.14

 for R

s. 60 Lakhs 

DR/6/14‐15

 dt. 22

.05.20

14 fro Rs. 60 Lakhs

EE(BC)51

/14‐15

 dt.2

6.12

.14

Shaiju.A.P

30.18%

 abo

ve E/R

5792

615

7540

828

9 Mon

ths

04.012

.014

03.07.20

15

29.03.20

15

Work completed

4 D86

P.33

5,65

Thiru

vambady

Kozhikod

e

Gen

eral Edu

catio

n

Construction of building for Govt. MUP School, Kodiyathur

4202

‐01‐80

0‐88

 Project und

er LAC

‐ADS

50 Lakhs

G.O(Rt) No.11

86/201

4/G.Edn

 dt 

04.03.14

 for 5

0 Lakhs

EE(BC)47

/14‐15

 dt.1

6.12

.14

ULCCS

 Ltd.

24.01%

 abo

ve E/R

4897

898

6073

883

9 Mon

ths

24.12.20

14

23.09.20

15

19.06.20

15

Work completed

.

101

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

87

P.33

5,72

Thiru

vambady

Kozhikod

e

Gen

eral Edu

catio

n Construction of first floor to the new building of 

Govt IHRD college of applied Sciences 

in Karassery Panchayat

4202

‐01‐80

0‐88

‐Projects L

AC ADS

 (NP)

100 Lakhs

GO(Rt)No.23

86/14/H.Edn dt. 

Tvm.8.10.14

 for R

s.10

0 Lakhs

DR‐51/14

‐15 dt 13.10

.14 for R

s.10

0L

11.8.15

EE(BC)84

/201

5‐16

 dt 1

.2.16

Sri. Majeed 

27.89%

 abo

ve E/R

9629

283

1231

4890

12 m

onths

09.02.20

16

08.02.20

17

Work in progress

vm. 

5 88

P.33

2,43

Thiru

vambady

Kozhikod

e

Gen

eral Edu

catio

n Construction of firstfloor for Govt 

LP School Kumaranallur in Kodiyathur Panchayat 42

02‐01‐80

0‐88

35 Lakhs

GO(Rt) No. 340

7/20

14/G

.Edn

. Dt. Tv

25.08.14

 for R

s. 35 Lakhs 

DR‐46/14

‐15 Dt.05.09

.14 for R

s.3

Lakh

EE(BC)17

/201

5‐16

 Dt.0

3.07

.15

Sri. Ab

dul Razak C

6.99

 % abo

ve ER

3197

399

3420

897

6 Mon

ths

10.7.201

5

9.1.20

16

16.10.15

nil

Work completed

100%

To be started

35.L

102

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

89

Thiru

vambady

Kozhikod

e

LSGD

Construction of new building for  Thiruvambady 

Grama panchayath office

515‐00

‐800

‐96 LAC AD

S (NP)  (De

posit work)

115L

GO(Rt) No. 257

6/20

14/LSG

DDt. Tvm. 

01.10.14

 for R

s. 115

Lakhs 

CR/25/20

14‐15 dtd 29

.12.20

14 fo

r 115

L

15.5.201

5

SE(K)75/20

15‐16 dated 6.02

.16

K Majeed

18.4% abo

ve ER

1068

3919

1264

9760

12 m

onths

16.02.20

16

15.02.20

17

Work started and progress

45

90

P.33

7,83

Thiru

vambady

Kozhikod

e

Gen

eral Edu

catio

n

Construction of new building for Govt UP School Manassery at 

Mukkom Panchayat

4202

‐01‐80

0‐88

‐Projects u

nder LAC

‐ADS

 (NP)

65 Lakhs

GO(Rt) No. 323

7/20

14/G

.Edn

. Dt. Tvm. 

12.08.14

 for R

s. 65 Lakhs 

DR‐38/14

‐15 Dt 30.08

.14 for R

s.65

 Lakhs

EE(BC)26

/201

5‐16

 Dt.2

1.08

.15

M/s ULCCS

 Ltd

30% abo

ve E/R

6203

294

8064

282

9 Mon

ths

01‐09‐20

15.

31‐05‐20

16

Work completed

75%

40. l

103

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

91

P.40

8,47

Thiru

vambady

Kozhikod

e

Health and

 Fam

ily W

elfare

LAC‐ADS Construction of building for PHC Cheruvadi at Kodiyathur Panchayath

4210

‐02‐80

0‐95

(01) Projects u

nder LAC

‐ADS

52.6 Lakhs

GO(Rt) No. 254

7/20

15/H&FW

D Dt. Tvm

. 5.08

.15 for R

s. 52.6 Lakhs 

1701

/201

5‐16

 dtd 21.11

.15 for 5

2.6L

3.12

.15

EE(BC)10

1/20

15‐16 Dt.02.03

.15

ULCCS

10% abo

ve E/R

5158

265

5674

092

12 m

onths

29.01.20

16

28.01.20

17

Work completed

75%

4

92

P.33

4,63

Thiru

vambady

Kozhikod

e

Gen

eral Edu

catio

n Construction of building/Auditoriu

m GMUPS Kaithapoyil Puthuppady Panchayath in 

Kozhikode District

4202

‐01‐80

0‐88

 Projects u

nder LAC

‐ADS

 (NP)

40 Lakhs

GO(Rt) No. 224

5/20

15/G

.Edn

. Dt. Tvm. 

09.06.20

15 fo

r Rs. 40 Lakhs 

763/20

15‐fo

r 39.99

 Lakhs

8.10

.201

5

EE(BC)92

/201

5‐16

 dt 1

8.02

.201

6

M/s Anjana Co

nstructio

ns

7.21

% abo

ve ER

3847

811

4125

238

9 Mon

ths

27.02.20

16

26.11.20

16

Work completed

85%

104

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

93

P.33

6,73

Thiru

vambady

Kozhikod

e

Gen

eral Edu

catio

n Construction of second floor to existing two 

storied building for GLPS, Kakkad, Kozhikode 

4202

‐01‐80

0‐88

‐Projects L

AC ADS

 (NP)

23 Lakhs

GO(Rt) No. 138

3/20

15/G

.Edn

. Dt. Tvm. 

8.04

.15 for R

s. 23 Lakhs 

669/15

‐16  Dt.3

0.07

.15 for 2

3 Lakhs

EE(BC)43

/201

5‐16

 Dt.1

9.11

.15

Abdu

l Razak

9.9%

 abo

ve ER

2148

358

2361

046

9 Mon

ths

27‐11‐20

15

26‐08‐20

16

Work completed

70%

(NP)

m. 

8L 5

94

P.60

,53

Thiru

vambady

Kozhikod

e

Revenu

e De

partmen

t

Construction of new builing for 

Koodaranji village office, Kozhikode 

4059

‐60‐05

1‐72

‐Projects L

AC ADS

 (

30.80 Lakhs

GO(Rt) No. 154

6/20

15/RD. Dt. Tvm

25.03.15

 for R

s. 30.8 Lakhs 

1030

/15‐16

 dtd 9.9.15 for R

s.30

. 8

9.10

.201

5

EE(BC) 66/20

15‐16 dtd 10

.12.15

Abdu

l Razak

9.9%

 abo

ve E/R

2978

926

3272

840

9 mon

ths

21.12.20

15

20.09.20

16

Work completed

70%

25.L

105

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

95

P.33

4,60

Thiru

vambady

Kozhikod

eLAC ‐ ADS 

Construction of New kitchen block 

for GLPS, Anayamkunnu in Karassery Grama 

Panchayat

4202

‐01‐80

0‐88

‐Projects u

nder LAC

‐ADS

(NP)

18.50 Lakhs

GO(Rt) No. 136

1/20

15/G

.Edn

. Dt. Tvm. 

07.04.20

15 fo

r Rs. 18.5 Lakhs 

1362

/15‐16

 Dt.0

1.07

.15 for R

s.18

.50 Lakhs

EE(BC)42

/201

5‐16

 Dt.1

9.11

.15

C.Ab

dul Razak

9.90

% abo

ve ER

1809

489

1988

629

6 Mon

ths

27‐11‐20

15

26‐05‐20

16

Work completed

80%

15.L

4

106

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

96 vambady

hikode

LAC ‐ ADS Construction of KSRTC Bus Depot, Thiruvambady in io

n of capita

l Assets P

roject und

er LAC

‐ADS

0 Lakhs

Tvm. 09.09

.201

5 for R

s. 100

 Lakhs 

01.16 for R

s 100

lakhs

02.201

6

‐17 dated 02

.12.16

aiju.A.P

% below

 ER

9757

6

4546

3

mon

ths

wotk to be started

Thiru

v

Koz Thiruvambady in 

Thiruvambady Grama Panchayat

3055

‐00‐19

0‐97

‐35‐Grants for th

e creat

100

GO(Rt) No. 419

/201

5/Tran

 Dt. T

2675

/201

5 dtd 9.0

15.0

EE(BC)99

/201

6‐

Sha

15.13% 959

814

12 m

Agt. Executed

, w

107

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

97

Thiru

vambady

Kozhikod

e

AYUSH

LAC ‐ ADS Construction of building for Govt 

Homoeo dispensary, Koodaranji, 

Kozhikode District

4210

‐02‐80

0‐95

 LAC

 ADS

 (NP)

38L

GO(Rt) No. 71/20

16/AYU

SH dtd. 

Tvm. 06.02

.201

6 for R

s. 38L Lakhs 

Finishing Work 

(NP)

dtd. Tvm

. akhs 

6 for R

05.201

6

98

Thiru

vambady

Kozhikod

e

Gen

eral Edu

catio

n

LAC ‐ ADS Construction of first floor 4 class rooms at GUPS Thotumukkam

4202

‐01‐80

0‐88

 LAC

 ADS

 

34L

GO(Rt) No. 245

/201

6/G.Edn

 d20

.01.20

16 fo

r Rs. 34L La

3556

/15‐16

 dated

 24.02

.201

34L

11.03.20

16

EE(BC)04

/201

6‐17

 dated

 28.0

Ummer K.P

9.30

% below

 ER

3223

941

2924

114

8 Mon

ths

Work completed

108

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

99

Kodu

vally

Kozhikod

e

Gen

eral Edu

catio

nConstruction of building for Govt. Higher Secondary School, Koduvally

5054

‐80‐80

0‐67

(NP)

112 Lakhs

GO(Rt)13

38/201

3/G.Edn

. dt. Tvm. 

21.03.20

13 fo

r Rs.11

2 Lakhs

CR/09/13

‐14 dt. 03.09

.201

3 for R

s. 112

 Lakhs

SE(K)38/20

14‐15 Dt.09.01

.15

C.Ha

ssan

38.30 % abo

ve ER

1041

6515

1440

6040

12 M

onths

27.12.20

14

26.12.20

15

Work completed

100% 40L

100

Kodu

vally

Kozhikod

e

Construction of building for 

Thamarassery Taluk Hospital‐O.P Block(Phase 1)

100 Lakhs

GO(Rt)15

11/201

3/H&

FWD. dt. Tvm. 

02.05.20

13 fo

r Rs.10

0 Lakhs

DR.50/13

‐14 dt. 29.08

.13 for R

s.10

0 Lakhs

EE(BC)18

/201

5‐16

 Dt.0

7.07

.15

Peruvayal Con

struction

50% abo

ve ER

9539

901

1430

9852

12 M

onths

Work completed

109

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

101

Kodu

vally

Kozhikod

e

Gen

eral Edu

catio

n

Construction of building for Govt. Higher Secondary School, Narikkuni

4202

‐01‐20

1‐99

100 Lakhs

GO(Rt)94

2/20

13/G

.Edn

. dt. Tvm. 

27.02.20

13 fo

r Rs.10

0 Lakhs

DR/63/12

‐13 dt. 30.03

.201

3 for 

Rs. 100

 Lakhs

EE(BC)61

/201

3‐14

 dt.1

7.02

.14

Sri. Majeed. K. 

20% abo

ve ER

90,89,17

6

1,09

,07,01

1

Work completed

.

46.61

vm. 

hs 100 Lakhs

.13

ver

102

P.29

6,99

Kodu

vally

Kozhikod

e

Gen

eral Edu

catio

n

Construction of building for Govt. Higher Secondary School, Pannur 10

0 Lakhs

 GO(Rt)43

8/20

13/G

.Edn

. dt. Tv

31.01.20

13 fo

r Rs.10

0 Lakh

DR/56/12

‐13 dated 15

.03.13

 for R

s.

EE(BC)36

/201

3‐14

 bdt.01.11

Sri. Ab

dul Rashe

ed T

23.5% abo

ve ER. 

9166

163

1132

0211

12 M

onths

4.10

.201

3

3.9.20

14

Work completed

. Hande

d o v

114.98

110

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

103

P.33

6,76

Kodu

vally

Kozhikod

eConstruction of Administrative 

block building for Govt. Arts & 

Science College Koduvally

202‐01

‐800

‐88‐ Projects u

nder LAC

 ADS

(NP)

Rs.2.95 CR

GO(Rt) No.20

60/201

4/H.Edn. dt. 28

.08.20

14 

for R

s.29

5 Lakhs

Reg.No.32

08/201

5‐16

 Dated

 11.02

.201

6

02.03.20

16

SE(K)102

/201

5‐16

 dated

 22.03

.201

6

Sri.A

.K.Varun

2.60

% below

 ER

2643

8305

2575

0909

18 m

onths

Wor

k in

pro

gres

s.

5%

4  G

104

P.29

9,13

3

Kodu

vally

Kozhikod

e

Gen

eral Edu

catio

n Construction of building for Govt. Higher Secondary 

School, Karuvampoyil in 

Koduvally Panchayath

4202

‐01‐20

2‐99

41 Lakhs

 GO(Rt)80

2/20

13/G

.Edn

. dt. Tvm. 

19.02.20

13 fo

r Rs.41

 Lakhs

DR/12/13

‐14 dated 16

.04.13

 for R

s.41

 Lakhs

EE(BC)01

/201

4‐14

 dt.1

1.04

.201

4

Sri. K. M

ajeed

8% abo

ve ER   

40,94,81

3

44,22,39

8

6 mon

ths

28.09.20

13

27.03.20

14

03.02.20

14

Work completed

111

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

105

P.33

6,74

Kodu

vally

Kozhikod

e

Gen

eral Edu

catio

nConstruction of building for GLP School, Chamal 

Kattipara

202‐01

‐800

‐88‐ Projects u

nder LAC

 ADS

(NP)

25 Lakhs

GO(Rt)  118

9/20

14/G

.Edn

 Tvm

 dtd 

04.03.20

14 fo

r Rs. 25L

DR/10/14

‐15 dated 02

.06.14

 for R

s.25

 Lakhs

15.07.20

16

EE(BC)91

/201

6‐17

 dt 0

1.11

.201

6

Basheer K

28.96%

 abo

ve ER

2379

350

3068

410

6 mon

ths

Agt. Executed

, work to be started

4 D

106

P.33

6,75

Kodu

vally

Kozhikod

e

Gen

eral Edu

catio

n

Construction of building for GLP School,Vetti 

Ozhinzha thottam, Kattipara

4202

‐01‐80

0‐88

‐ Projects u

nder LAC

 ADS

(NP)

25 Lakhs

GO(Rt)  119

0/20

14/G

.Edn

 Tvm

 dtd 

04.03.20

14 fo

r Rs. 25L

DR/9/14‐15

 dated

 02.06

.14 for R

s.25

 Lakhs

15.07.20

16

EE(BC)92

/201

6‐17

 dt 0

1.11

.201

6

Basheer K

28.32%

 abo

ve ER

2360

683

3029

228

6 mon

ths

Agt. Executed

, work to be started

112

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

107

P.60

,52

Kodu

vally

Kozhikod

e Construction of building for Village Office, Kizhakkoth

4059

‐60‐05

1‐72

‐(Non

 Plan‐Vo

ted)

28 Lakh

GO(Rt)  248

2/20

14/RD Tvm dtd 05.06

.201

4 for R

s. 28L

DR/20/14

‐15 dated 05

.07.14

 for R

s.28

 Lakhs

31.10.20

14

EE(BC)29

/201

5‐16

 Dt.2

6.08

.15

T.Sathyan

33.94 % Abo

ve ER

2793

242

3741

268

6 Mon

ths

4.09

.201

5

3.3.20

16

Work completed

.

108

P.33

6,77

Kodu

vally

Kozhikod

e

Gen

eral Edu

catio

n Construction of building for Govt. 

LP School, Paimbalassery at Madavoor Grama 

Panchayat

4202

‐01‐80

0‐88

 Projects u

nder LAC

‐ADS

 (NP)

31 Lakhs

 GO(Rt)No 16

02/201

4/ G.Edn

. dtd. Tvm

. 23

.04.20

14 fo

r Rs.31

 Lakhs

DR/14/20

14‐15 dtd 16

.6/201

4 for R

s. 31 lakhs

EE(BC)22

/201

4‐15

 Dt.1

4.10

.14

SELM

EC Engg.

2.25

%be

low ER

2918

907

2853

232

6 Mon

ths

21.10.20

14

20.04.20

15

06.08.20

15

Work completed

.

113

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

109

P.33

6,78

Kodu

vally

Kozhikod

e

Gen

eral Edu

catio

n Construction of building for Govt. 

UP School, Vennakkad at 

Koduvally Grama Panchayat

202‐01

‐800

‐88‐Projects und

er LAC

‐ADS

 (NP)

33 Lakhs

 GO(Rt)No 16

03/201

4/ G.Edn

. dtd. Tvm

. 23

.04.20

14 fo

r Rs.33

 Lakhs

DR‐15/14

‐15 Dt.16.06

.201

4 for R

s.33

.00 lakh

EE(BC)14

/201

5‐16

 Dt.2

6.06

.15

SELM

EC Engg.

28.08%

 abo

ve ER

3115

627

3990

495

6 Mon

ths

06.07.20

15

05.01.20

16

Work completed

.

39  Lakhs

42 D

110

P.33

6,79

Kodu

vally

Kozhikod

e

Gen

eral Edu

catio

n Construction of building for 

Govt.MLP School, Kalaranthiri  at Koduvally Grama 

Panchayat

4202

‐01‐80

0‐88

‐Projects u

nder LAC

‐ADS

(NP)

50 Lakhs

 GO(Rt)No 16

04/201

4/ G.Edn

. dtd. Tvm

. 23

.04.20

14 fo

r Rs.50

  Lakhs 

DR‐16/14

‐15 Dt.16.06

.201

4 for R

s.50

.00 lakh

Wor

k st

arte

d

114

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

111

Kodu

vally

Kozhikod

e

Health and

 Fam

ily W

elfare

Construction of Ayurveda Dispensary Pannikkottur

210‐02

‐800

‐95‐Projects und

er LAC

‐ADS

 (NP)

25 Lakhs

GO(Rt)No. 234

4/ 201

4 H&

FWD dt.Tvm

 9.07

.201

4 for R

s.25

 Lakhs

DR‐44/14

‐15 Dt.05.09

.14 for 2

5 Lakhs

EE(BC)39

/201

5‐16

 Dt.0

3.10

.15

ULCCS

17.50%

 abo

ve ER

2389

219

2807

332

8 Mon

ths

25.09.20

15

24.05.20

16

Work completed

42

112

P.33

4,61

Kodu

vally

Kozhikod

e

Gen

eral Edu

catio

n Construction of building for Govt 

LP School, Nediyanad, 

Thamarassery in Kozhikode District

4202

‐01‐80

0‐88

‐Projects u

nder LAC

 ADS

(NP)

25 Lakhs

GO (R

t) No.15

37/201

5/G.Edn

 Dt.2

4.04

.15 for 

Rs.25 Lakh

3717

/201

5‐16

 dtd. 29.02

.201

6 for R

s. 25 

Lakhs

03.08.20

16

EE(BC)76

/201

6‐17

 dated

 23.09

.201

6

K Ab

dul Basith

5.13

% below

 ER

2271

255

2154

739

8 Mon

ths

Fin

ish

ing

stag

e

115

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

113

Kodu

vally

Kozhikod

e

Higher Edu

catio

nLAC ‐ ADS ‐ 

Construction of Thamarassery IHRD College Auditorium 42

02‐01‐80

0‐88

25Lakhs

No. 244

5/20

145/H.Edn dtd. Tvm

. 18‐09

‐201

5Da

ted:18

‐09‐20

15 

2015

‐201

6 dated 8.01

.201

6 for R

s 25 lakhs

03.08.20

16

EE(BC)77

/201

6‐17

 dated

 23.09

.201

6

K Ab

dul Basith

7.60

% below

 ER

2314

984

2139

045

6 mon

ths

Work started

G.O(Rt) N

2424

/2 E114

P.33

7,81

Kodu

vally

Kozhikod

e

Gen

eral Edu

catio

n LAC‐ADS‐ Construction of building for Govt High School Raroth 

in Kozhikode District

4202

‐01‐80

0‐88

‐Projects u

nder LAC

‐ADS

 (NP)

100 Lakhs

GO (R

t) No.24

82/201

5/G.Edn

 Dt.T

VM 20.06

.15 

for R

s.10

0 Lakh

859/20

15‐201

6 dtd. 12.08

.201

5 for R

s.10

0 Lakhs.

17.02.20

15

EE(BC)43

/201

6‐17

 Dt.2

5.07

.16

Majeed K

10% abo

ve ER

9011

509

9912

660

12 m

onths

Work started

116

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

115Ko

duvally

Kozhikod

e

Construction of building for 

community hall, Kizhakkoth in 

Kozhikode District

75 Lakhs

Estim

ate 

subm

itted

 for A

S

116

.337

,82

oduvally

ozhikode

Construction of Library Building for 

GHSS Thamarassery in 80

0‐88

(LAC

 ADS

)

5 Lakhs

2015

/G.Edn

 dtd. Tvm

. 12‐

015 for 2

5L

ated

 02.03

.201

6 for 2

5 lakhs

.06.20

16

‐17 dated 25

.07.20

16

dasan K P

% abo

ve ER

1969

10

3550

88

Mon

ths

rk started

P. Ko Ko Thamarassery in Kozhikode District

4202

‐01‐8 25

G.O(Rt) No. 338

2/2

08‐20

3834

/201

5‐16

 da

23.

EE(BC)41

/201

6‐

Siva

7.2% 21 23 8 

Wo r

117

Kodu

vally

Kozhikod

e

AYUSH

LAC ‐ ADS Upgradation of Omassery Govt. 

Ayurveda Dispensary of 

Koodathai Grama Panchayath

4210

‐02‐80

0‐95

‐Projects u

nder LAC

‐ADS

 

50 Lakhs

G.O.(R

t)No.10

5/20

16/AYU

SH dated

 Tvm04

.03.20

16

Agr

eem

ent

to b

e ex

ecu

ted.

117

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

118Ko

duvally

Kozhikod

e

LAC ‐ADS ‐ Construction of Building for CHC 

Narikkuni, Kozhikode District.

90 Lakhs

AS to

 be ob

tained

.

119 athu

r

zhikod

e

l Edu

catio

n

Construction of building for Govt. Higher Secondary ‐8

00‐67(NP)

50 Lakhs

Edn. dt. Tvm. 13.02

.201

3 50

.5 Lakhs

0.03

.13 for R

s.50

.5 Lakhs

4‐15

 dt.0

4.06

.14

V.Biju

above ER

67,945

70,482

mon

ths

11.201

5

05.201

6

completed

El

Koz

Gen

era Higher Secondary 

School, Puthiyappa

5054

‐80

50.5

 GO(Rt)67

3/20

13/G

.Efor R

s.5

DR/62/12

‐13 dated 3

EE(BC)6/20

14 P.V

42% a

47,

67,

6 m

13.1

12.0

Work c

118

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

120

Elathu

r

Kozhikod

eConstruction of 

proposed building for Ayurvedic Dispensery in 

Kuruvattur Grama Panchayat 13‐14)

210‐02

‐800

‐90‐Projects und

er LAC

‐ADS

 (NP)

65 Lakhs

GO(Rt)19

84/ 2

014 H&

FWD dt.Tvm

 17

.06.20

14 fo

r Rs. 65 Lakhs

DR‐764

/14‐15

 Dt.2

5.11

.201

4 for R

.65 Lakhs

EE(BC)25

/201

5‐16

 Dt.1

7.08

.15

Nou

shad

 Ali.P

24.96%

 abo

ve ER

6309

520

7884

376

12 M

onths

Shutterin

g work of slab

 in progreess

42 D

121

Elathu

r

Kozhikod

e

Construction of building for Ayurvedic 

Dispensery in Chelannur Grama 

Panchayat  4210

‐02‐80

0‐95

65 Lakhs

GO(Rt)29

56/ 2

015 H&

FWD dtd. 11.09

.201

5 for             Rs. 65 Lakhs

3613

/201

5‐16

 dtd.26.02

.201

6 for R

s.65

 Lakhs

3.8.20

16

EE(BC)66

/201

6‐17

 Dt.0

6.09

.16

K Ibrahimkutty

5.35

% below

 ER

5953

848

5635

318

10 M

onths

Work in progress

119

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

122

Elathu

r

Kozhikod

e Construction of building for Sub Registrar office 

Kakkodi

4059

‐60‐05

1‐72

‐Projects L

AC ADS

 

65 Lakhs

GO(Rt)No.20

5/20

16/TD.dt.Tvm

.04.03

.201

6 for 6

5 Lakhs

678/20

16‐17 dtd.07

.06.20

16 fo

r Rs.65

 Lakhs

13.07.20

16

EE(BC)62

/201

6‐17

 Dt.2

008.16

Aboo

backer K

8.22

% below

 ER

5816

438

5338

327

8 Mon

ths

Work started

123

P.29

8,12

6

Balussery

Kozhikod

e

Gen

eral Edu

catio

n

Construction of Building for H.S.S 

Avitanallur, Balussery 

4202

‐01‐20

2‐99

 (NP)

50 Lakhs

 GO(Rt)13

58/13/G.Edn

. dt. Tvm. 22.03

.13 

for R

s.50

 Lakhs

DR/27/13

‐14 dated 06

.06.13

 for R

s.50

 Lakhs

EE(BC)33

/201

3‐14

 dated

 10.10

.13

Sri. V.K. Sun

il Ku

mar

0.5 % Below

 ER

43,60,56

8

43,38,76

5

6 mon

ths

17.10.20

13

16.04.20

14

16.10.20

14

Work completed

120

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

124

P.29

8,12

0

Balussery

Kozhikod

e

Gen

eral Edu

catio

nConstruction of Building for Govt H.S.S Naduvannur

4202

‐01‐20

2‐99

 (NP)

75 Lakhs

O(Rt)12

39/13/G.Edn

. dt. Tvm. 15.03

.13 for 

Rs.75 Lakhs

/15/13

‐14 dated 22

.04.20

13 fo

r Rs. 75 Lakhs 

EE(BC)26

/201

3‐14

dt.31‐8‐13

Sri. Girisan

4% below

 ER

70,40,80

0

67,59,16

8

9 mon

ths

17.10.20

13

16.04.20

14

16.10.20

14

Work completed

64.54

 G DR/

125

P.29

8,12

7

Balussery

Kozhikod

e

Gen

eral Edu

catio

n

Construction of Building for Govt H.S.S Kayanna

4202

‐01‐20

2‐99

 (NP),505

4‐80

‐800

‐67 (NP)

30 Lakh

GO(Rt)12

99/13/G.Edn

. dt. Tvm. 19.03

.13 

for R

s. 30 Lakhs

DR/16/13

‐14 dated 23

.04.13

 for R

s.30

 Lakhs

11.12.20

14

EE(BC)23

/201

5‐16

 Dt.1

3.08

.15

Sri. Ab

dul A

zees

40% abo

ve ER

2811

756

3936

458

6 mon

ths

20‐08‐20

15

19.02.20

16

Work completed

15L

121

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

126

Balussery

Kozhikod

e

Kinaloor Industrial Centre ‐ 

Construction of Building for 

Women's Mini Industrial, Panangaad   

0‐96

 (NP)     844

3‐00

‐108

PW Dep

osit

55.3Lakhs

dt. Tvm

. 06.05

.13 for R

s. 25 Lakhs &

 Revise

d 4/LSGD dt. Tvm

. 25.08

.14 for R

s. 55.30

 Lakhs

6 datedv

 24.02

.201

6 for R

s 553

0000

/‐

23.04.20

16

BC)55/16

‐17 dtd 01

.08.20

16

Saji P

2.5%

 below

 ER

5257

140

5125

711

6 mon

ths

50% com

pleted

4515

‐00‐80

0

GO(Rt)12

20/LSG

D d

GO(Rt)No. 220

1/14

3557

/201

5‐16

EE(B

127

Balussery

Kozhikod

e Construction of Stadium at Balussery

4515

‐00‐80

0‐96

/LAC

 ADF

 (NP)

100 Lakhs

GO(Rt)12

40/13/LSGD  dt. Tvm. 09.05

.13 for 

Rs. 100

 Lakhs

DR/63/13

‐14 dated 15

.11.13

 for R

s. 100

Lakhs

EE(BC)24

/201

4‐15

 dt.2

0.10

.14

Sri. Sunil Kum

ar

9.65

% abo

ve ER

8647

016/‐

9481

453/‐

12 m

onths

29.10.20

14

28.04.20

15

30.06.20

15

Work completed

94.81L

122

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

128

P.40

7,39

Balussery

Kozhikod

e

LSGD

Deveoplment of Basic Amenities for Community Health Centre, Balussery Block Panchayath

4210

‐02‐80

0‐95

 (NP)

50Lakhs

GO(Rt)24

07/13/H&

FWD  dt. Tvm. 05.07

.13 

for R

s. 50 Lakhs

DR/55/13

‐14 dated 07

.10.13

 for R

s.50

 Lakhs

EE(BC)23

/201

4‐15

 dt.2

0.10

.14

M/s ULCCS

 Ltd. , Vatakara

24% abo

ve ER

4411

100

5469

764

6 mon

ths

29.10.20

14

28.04.20

15

30.06.20

15

Work completed

54.70L

129

P.33

5,66

Balussery

Kozhikod

e Construction of building for Arts and Science 

College, Balussery

4202

‐01‐80

0‐88

‐Projects u

nder LAC

‐ADS

(NP)

420 Lakhs

GO(Rt) No. 121

9/15

/H.Edn

. dt. Tvm. 28.05

.15 

for R

s. 420

 Lakhs

KKD/20

15‐201

6/20

15/377

6 dt 12.12

.201

5

14.1.201

6

SE(K)74/20

15‐16 dated 5.2.20

16

P.K.Ba

lan

0.68

% below

 ER

4278

8851

4249

7887

18 m

onths

Work started.

123

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

130

Balussery

Kozhikod

eConstruction of Gymnasium at Usha School of 

Athletics at Kinalur, Kozhikode 

2204

‐00‐10

4‐87

‐Non

 Plan

20 Lakhs

G.O(Rt)No. 74/12

/S&YA

 dt. 

27.03.20

12 fo

r Rs. 20 Lakhs 

DR/29/13

‐14 Dt 10.06

.201

3

EE(BC)38

/201

3‐14

 Dt.30.11

.201

3

Sri.K.Abd

ul Azeez

Estim

ate Ra

te

3694

300

3694

300

6 Mon

ths

4.12

.201

3

3.06

.201

4

31.03.20

15

Work completed

2208

591

15L

131

Balussery

Kozhikod

e Construction of Mini Civil Station, 

Balussery 450 Lakhs

A.S. 

estim

ate 

subm

itted

K 4 s

132

Balussery

Kozhikod

e

Gen

eral Edu

catio

n

LAC ADS Thrikkuttissery GUPS Smart 

Classroom project in Balussery LAC

25 Lakhs

GO(Rt)No.36

13/201

5/G.Edn

 dated Tvm 25/08

/201

5 for 2

5 L

The work will be executed

 through IT@Scho

ol.

PWD has to draw

 and

 disburse th

e am

ount to

 MD, 

Keltron

 as p

er GO

124

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

133 08,40

ypore

hikode

amily W

elfare

Construction of Community Health 

800‐95

 (NP)

Lakhs

 Tvm

. .07

.13 for R

s.10

0 Lakhs

.10.20

13 fo

r Rs. 100

 Lakhs

1.20

14

4‐15

 dt.2

8.10

.14

ompany

 Ltd, Che

ruvann

ur

bove ER

4172

93,898

mon

ths

1.20

14

1.20

15

2.20

16

ompleted

.

00%

Lakhs

ion for tim

e is applied for 3

 mon

ths u

p to 

2.20

16

133

P.40

Bey

Kozh

Health and

 F Centre, Feroke ‐ OP Block

4210

‐02‐8

100 

GO(Rt)27

05/13/H&

FWD  dt.

DR/54/20

13‐14 dated 05

29.01

EE(BC) 28/20

14

Build

 Con

 Con

struction C

27 % a

818

1,03

,9

12 m

06.11

05.11

05.02

Work co 10

105 

Structure completed

. com

pleted

 .Exten

s05

.02

125

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

134

P.40

8,41

Beypore

Kozhikod

e

Construction of building for 

Community Health Centre 

Cheruvannur 

4210

‐02‐80

0‐95

‐ LAC

 ADF

  (NP)

75 Lakhs

) No. 342

4/20

13/H&FW

D dt.08.10

.13 for 

Rs.68 Lakhs

/201

3‐14

 dated

 11.12

.201

3 for R

s. 68 Lakhs

EE(BC)50

/201

5‐16

 dtd 28.11

.15

arway Infrastructures (India) Pvt. Ltd, Kochi

43.87%

 abo

ve ER.

55,83,59

9

8033

124

9 Mon

ths

03.02.20

16

02.11.20

16

Wor

k in

pro

gres

s

50 Lakhs

started. Existing bu

ilding be

ing de

molish

ed

GO(Rt

DR/73 /

M/s Cle

Work s

135

Beypore

Kozhikod

e

Gen

eral Edu

catio

n

Construction of building for Nallalam GHS

5054

‐80‐80

0‐67

 (NP)

90 Lakhs

GO(Rt)18

05/201

3/G.Edn

  dt. Tvm. 23.04

.13 for 

Rs.90 Lakhs

DR/33/13

‐14 dated 14

.06.13

 for R

s.90

 Lakhs

EE(BC)5/20

14‐15 dt.04.06

.14

A.K.Dine

san

22.96 % abo

ve ER

82,13,60

9

1,00

,99,45

4

12 M

onths

05.06.20

14

12Mon

ths

NIL

01.04.20

15

Work completed

100%

work to be started

Rs 35 lakhs

Building hand

ed over to the Scho

ol Autho

rity

126

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

136

Beypore

Kozhikod

e

Gen

eral Edu

catio

nConstruction of building for Govt. Ganapat VHSS, 

Feroke

5054

‐80‐80

0‐67

 (NP)

225L akhs

G.O(Rt)No. 488

8/13

 G.Edn

. Dt. Tvm 

20.11.13

  for RS.22

5 Lakhs

CR/01/20

14‐15 dtd 15

.05.20

14 fo

r 22

0L

14.7.201

4

SE(K)43/20

14‐15 dt.11.02

.15

ULCCS

39 %above ER

2000

1929

2780

2681

18 m

onths

18.02.15

17.10.20

16

Work completed

.

for 

Ltd

137

P.33

2,44

Beypore

Kozhikod

e

Gen

eral Edu

catio

n

LAC‐ADF 2013‐14 ‐ Construction of 

School  building for GVHSS, 

Cheruvannur 4202

‐01‐80

0‐88

200 Lakhs

GO(Rt)43

61/201

4 G.Edn

. Dated

 Tvm

.20.10

.201

4 20

0 Lakhs

2005

/201

5‐16

 dtd14

.12.20

15 fo

r 200

L

16.01.20

16

SE(K)80/20

15‐16 dt.10.02

.16

M/s Ansam

 India Co

nstructio

n & Develop

ers P

vt 

0.10

% below

 ER

1879

2415

1877

3623

18 m

onths

19.02.20

16

18.08.20

17

work in progress

410%

50 Lakhs

127

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

138

Beypore

Kozhikod

e LAC‐ADF 2013‐14 ‐ Construction of 

Cheruvannur Mini Stadium Gallery

8443

‐00‐10

8‐Pw

depo

sit

100 Lakhs

G.O.(R

t) No. 248

2/20

14/LSG

DDa

ted:23

‐09‐20

14

 204

1/20

16‐201

7 dated 8.8.16

 

30.09.20

16

EE(BC)10

0/20

16‐17 dated 

29.12.20

16

Aboo

backar Siddik

item ra

te

8100

974

6515

651

8 Mon

ths

Agreem

ent e

xecuted

2016

 

.75 

 Ltd. 

139

Beypore

Kozhikod

e

LAC‐ADS Construction of 

School building for Govt Mappila L.P.School, 

Karuvanthiruthy in Kozhikode District

75 Lakhs

GO(Rt)89

1/20

16 G.Edn

. Dated

 01.03

.for 7

5 Lakhs

259/20

16‐17 dtd 19

.05.20

16 fo

r Rs

Lakhs

23.06.20

16

EE(BC)45

/201

6‐17

 Dt.2

7.07

.16

M/s JU

MAR

C Engg. Con

sulta

nts P

vt.

1.10

% below

 ER

7709

9981

7021

881

10 M

onths

Agreem

ent e

xecuted

128

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

140

P.33

3,48

Beypore

Kozhikod

e

Gen

eral Edu

catio

nLAC‐ADS 

Construction of Auditorium in 

GHSS Beypore in Kozhikode District 42

02‐01‐80

0‐88

70 Lakhs

GO(Rt) No. 214

4/20

15/G

.Edn

. Tvm

. dt. 

02.06.20

15 fo

r Rs. 70 L

2826

/201

5‐16

 dated

 24.01

.201

6 for R

s 70 

lakhs

9.03

.201

6

EE(BC)25

/201

6‐17

 Dt.1

5.06

.16

C.P. M

oide

en Kun

hi

9% below

 ER

6550

591

5961

038

10 M

onths

Work started

2141

Beypore

Kozhikod

e

LAC‐ADS Construction of Community Hall for Kadalundi 

Grama Panchayath 4515

‐00‐80

0‐96

250 Lakhs

GO(Rt)No.16

42/15/LSGD 

dt.01.06

.201

5 for R

s.25

0 L

Structural design 

received

. T.S. estim

ate 

unde

r preparatio

n.

142

Beypore

Kozhikod

e

LAC‐ADS 2015‐16 ‐ Construction of Karuvanthuruthy PHC Sub Centre in Feroke Grama Panchayath in 

Kozhikode District

75 Lakhs

TS Estim

ate  und

er 

prep

aration

129

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

143

Beypore

Kozhikod

e

LAC‐ADS 2015‐16 ‐ Construction of building for 'Pakal 

Veedu' and Anganwadi in 

Kadalundi Grama Panchayat in 

Kozhikode District

10 Lakhs

Estim

ate  su

bmitted

 for A

S

144 ypore

hikode

LAC‐ADS 2015‐16 ‐ Construction of building for Ayurveda  La

khs

mate  und

er 

aration

Bey

Kozh

yDispensary in Beypore, 

Kozhikode Disrict

50 

A.S. Esti m

prep

a

130

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

1

Thi

ruva

mba

dy

KK

D

Inte

grat

ed r

enov

atio

n o

f A

dmin

istr

ativ

e an

d A

cade

mic

blo

ck a

t G

ovt c

olle

ge, K

oden

cher

y

4059

-01-

051-

96

150

G.O

(Rt)

No.

209

9/20

14/H

.Edn

dat

ed

Tvm

30.

8.20

14 f

or R

s 15

0L

Reg

. No.

2015

-16/

2015

/284

dat

ed

28.0

9.20

15 f

or R

s 15

0L

15.1

0.20

15

SE

(K)5

4/20

15-1

6 da

ted

4.12

.201

5

K.V

.San

thos

h K

umar

11.3

0% b

elow

E/R

1448

2428

1284

5913

9

Agr

eem

ent e

xecu

ted

Sta

ge o

f E

lect

rifi

cati

on

Exp

end

itu

re u

pto

cu

rren

t

mon

th

Am

oun

t re

qu

ired

up

to t

his

fi

nan

cial

yea

r

Rem

ark

S.H

.O d

ate

D.O

.C a

s p

er A

gree

men

t

Ext

end

ed D

.O.C

.

Act

ual

D.O

.C

Pre

sen

t st

age

Ph

ysic

al p

rogr

ess

Per

iod

of

com

ple

tion

in

mon

ths

Nam

e of

Pro

ject

Hea

d o

f A

ccou

nt

Est

imat

e A

mou

nt

AS

No.

, d

ate

& A

mou

nt

TS

No.

, d

ate

& A

mou

nt

Dat

e of

Ten

der

Agr

eem

ent

No.

& D

ate

Nam

e of

Con

trac

tor

Ten

der

per

cen

tage

Est

imat

e P

AC

Agr

eed

PA

C

Dep

artm

ent

Sl.N

o

Bu

dge

t p

age

No.

&It

em

No.

Bu

dge

t P

rovi

sion

in L

akh

s

L.A

. Con

stit

uen

cy

Div

isio

n