TUGAS SMJL ANALISIS KERUSAKAN JALAN METODE PCI Prepared by: Widya Handayani D4 TPJJ RPL 2012 CONTOH SOAL Distress Types 1 Alligator Crack 10 L Longitudinal Crack 10 T Transversal Crack 11 Patching 13 Potholes 19 Weathering & Ravelling Severity Data Existing Distress Type 1 11 10T 13 Severity 10.6 x 1.8 19.08 H 1.7 x 2.5 4.25 M 0.5 x 1 0.5 L 0.1 x 0.1 0.01 L 0.75 x 1.4 1.05 H 2.3 x 1.4 3.22 L 1.1 x 0.6 0.66 M 0.6 x 0.8 0.48 M 1.2 x 2.8 3.36 L 2.2 x 2.4 5.28 M 1.83 x 4.5 8.235 H 0.4 x 1.4 0.56 L 0.3 x 1 0.3 L 0.9 x 1.1 0.99 M 0.3 x 0.2 0.06 M 1.2 x 2.8 3.36 L 0.9 x 1.1 0.99 M 0.6 x 1.7 1.02 M L 7.02 3.22 0.5 0.57 M 2.01 10.52 0.66 0.54 H 20.13 0 8.235 0 Luas per segment(m2) = 150 x 3.5 = 525 m2 Existing Distress Type 1 11 10T 13 L 1.34% 0.61% 0.10% 0.11% M 0.38% 2.00% 0.13% 0.10% H 3.83% 0.00% 1.57% 0.00% Deduct Value (DV) Total Severi ty Density (% )

Transcript of Tugas Smjl - Metode Pci

Page 1: Tugas Smjl - Metode Pci

TUGAS SMJL ANALISIS KERUSAKAN JALAN METODE PCI

Prepared by: Widya Handayani

D4 TPJJ RPL 2012

CONTOH SOAL

Distress Types

1 Alligator Crack

10 L Longitudinal Crack

10 T Transversal Crack

11 Patching

13 Potholes

19 Weathering & Ravelling

Severity Data

Existing Distress Type

1 11 10T 13 19 10L

Seve

rity

10.6 x 1.8 19.08 H 1.7 x 2.5 4.25 M 0.5 x 1 0.5 L 0.1 x 0.1 0.01 L

0.75 x 1.4 1.05 H 2.3 x 1.4 3.22 L 1.1 x 0.6 0.66 M 0.6 x 0.8 0.48 M

1.2 x 2.8 3.36 L 2.2 x 2.4 5.28 M 1.83 x 4.5 8.235 H 0.4 x 1.4 0.56 L

0.3 x 1 0.3 L 0.9 x 1.1 0.99 M 0.3 x 0.2 0.06 M

1.2 x 2.8 3.36 L

0.9 x 1.1 0.99 M

0.6 x 1.7 1.02 M

L 7.02 3.22 0.5 0.57

M 2.01 10.52 0.66 0.54

H 20.13 0 8.235 0

Luas per segment(m2) = 150 x 3.5 = 525 m2

Existing Distress Type1 11 10T 13 19 10L

Den

sity

(% ) L 1.34% 0.61% 0.10% 0.11% 0.00% 0.00%

M 0.38% 2.00% 0.13% 0.10% 0.00% 0.00%

H 3.83% 0.00% 1.57% 0.00% 0.00% 0.00%

Deduct Value (DV)

Tota

l Se

verit

y

Page 2: Tugas Smjl - Metode Pci

Dari grafik didapat nilai Deduct Value sebagai berikut

Existing Distress Type1 11 10T 13 19 10L

L 13 2 0 21

M 14 13 0 34

H 48 0 23 0

Allowable Maximum Deduct Value (m)

Formula :

m = 1 + (9/98)*(100 – HDV)

HDV = 48 m = 5.78 = 5

Iterasi nilai qdata = 7status data : data sesuai nilai m koreksi = 10.082

DV 48 34 23 21 14 13 13 2ket OK OK OK OK OK OK OK NGNo Deduct Value TDV q CDV1 48 34 23 21 14 13 10.08 163 6 782 48 34 23 21 14 2 10.08 152 5 843 48 34 23 21 2 2 10.08 140 4 814 48 34 23 2 2 2 10.08 121 3 805 48 34 2 2 2 2 10.08 100 2 706 48 2 2 2 2 2 10.08 68.08 1 66

CDV (Corrected Deduct Value)

PCI Calculation

PCI = 100 - CDV Keterangan :PCI = 100 - 84 PCI KATEGORI PEMELIHARAANPCI = 16 80 - 100 SANGAT BAIK -

50 -79 BAIK PERMUKAANRating = SANGAT RUSAK 25 - 49 RUSAK PELAPISAN ULANG

Jenis Pemeliharaan = REKONSTRUKSI 0 - 24 SANGAT RUSAK REKONSTRUKSI

Ded

uct

Valu

e

I85
widya: karena m = 5, maka bilai dv tidak dipakai
J85
widya: karena dv <=2, dan m = 5, maka bilai dv tidak dipakai
Page 3: Tugas Smjl - Metode Pci

TUGAS SMJL ANALISIS KERUSAKAN JALAN METODE PCI

CONTOH SOAL

Severity Data

Existing Distress Type

10L

Existing Distress Type10L

0.00%

0.00%

0.00%

Deduct Value (DV)

Page 4: Tugas Smjl - Metode Pci

Existing Distress Type10L

Allowable Maximum Deduct Value (m)

Iterasi nilai q

CDV (Corrected Deduct Value)

PCI Calculation