    1. South of the Borders, Inc. is a custom wallpapers and borders manufacturer. While their

    products vary in visual design, the manufacturing process for each of the products is

    similar. Each day a sample of 100 rolls of wallpaper border is sampled and the number

    of defective rolls in the sample is noted. The number of defective rolls in samples from

    25 consecutive production days follows. Determine all coordinates; construct &interpret the p chart.

    Day Defective Rolls Day Defective Rolls

    1 13 14 8

    2 4 15 9

    3 7 16 3

    4 11 17 5

    5 8 18 14

    6 10 19 107 2 20 11

    8 9 21 6

    9 12 22 6

    10 6 23 9

    11 4 24 3

    12 7 25 10

    13 9

    JAWAB:

    Berikut adalah grafik peta kendali c:

    Sample

    Proportion

    252321191715131197531

    0,16

    0,14

    0,12

    0,10

    0,08

    0,06

    0,04

    0,02

    0,00

    _P=0,0784

    UCL=0,1590

    LCL=0

    P Chart of C1

  • 8/10/2019 TUGAS PENGMUTTT

    2/5

    2. Scientific & Technical Materials, Inc. produces material for use as gaskets in scientific,

    medical, and engineering equipment. Scarred material can adversely affect the ability of

    the material to fulfill its intended use.

    A sample of 40 pieces of material, taken at a rate of 1 per each 25 pieces of material

    produced gave the results on the following slide. Use this information to construct andinterpret a C chart

    Piece Scars Piece Scars Piece Scars Piece Scars

    1 4 11 1 21 2 31 2

    2 4 12 1 22 1 32 1

    3 2 13 2 23 0 33 1

    4 3 14 3 24 3 34 3

    5 1 15 0 25 5 35 2

    6 2 16 4 26 4 36 07 0 17 3 27 2 37 1

    8 2 18 2 28 1 38 5

    9 3 19 2 29 4 39 9

    10 1 20 1 30 2 40 1

    JAWAB:

    Berikut adalah grafik dari peta kendalip:

    Sample

    Samp

    leCount

    37332925211713951

    9

    8

    7

    6

    5

    4

    3

    2

    1

    0

    _C=2,25

    UCL=6,75

    LCL=0

    1

    C Chart of C2

  • 8/10/2019 TUGAS PENGMUTTT

    3/5

    3. PT XYZ adalah suatu perusahaan pembuatan suatu produk industri. Ditetapkan

    spesifikasi adalah : 2.40 0,05 mm. Untuk mengetahui kemampuan proses dan

    mengendalikan proses itu bagian pengendalian PT XYZ telah melakukan pengukuran

    terhadap 20 sampel. Masing-masing berukuran 5 unit (n=5).

    Hitung proses capability data di bawah ini (cp dan cpk) ! Simpulkan

    contoh pengukuran pada unit contoh (n=5)

    sampel X1 (mm) X2 (mm) X3 (mm) X4 (mm) X5 (mm)

    1 2.41 2.40 2.42 2.37 2.41

    2 2.39 2.42 2.41 2.39 2.42

    3 2.42 2.38 2.39 2.37 2.40

    4 2.39 2.39 2.37 2.41 2.38

    5 2.38 2.42 2.39 2.38 2.41

    6 2.41 2.38 2.40 2.37 2.39

    7 2.36 2.40 2.37 2.38 2.40

    8 2.39 2.39 2.39 2.41 2.38

    9 2.39 2.38 2.37 2.37 2.39

    10 2.42 2.42 2.38 2.42 2.39

    11 2.39 2.39 2.43 2.39 2.38

    12 2.38 2.38 2.41 2.37 2.39

    13 2.42 2.39 2.40 2.41 2.41

    14 2.40 2.38 2.38 2.39 2.39

    15 2.39 2.40 2.41 2.41 2.37

    16 2.41 2.42 2.42 2.41 2.39

    17 2.38 2.40 2.37 2.39 2.38

    18 2.43 2.37 2.39 2.36 2.38

    19 2.39 2.41 2.40 2.38 2.37

    20 2.37 2.42 2.40 2.41 2.38

  • 8/10/2019 TUGAS PENGMUTTT

    4/5

    JAWAB:

    Berikut adalah grafik yang menunjukkan UCL dan LCL:

    Berikut adalah grafik yang menunjukkan CP dan CPK:

    Cp: 0,45 dan Cpk: 0,45

    Sample

    SampleMean

    191715131197531

    2,42

    2,40

    2,38

    __X=2,394

    UC L=2,41737

    LCL=2,37063

    Sample

    SampleRange

    191715131197531

    0,08

    0,06

    0,04

    0,02

    0,00

    _R=0,04051

    UC L=0,08567

    LCL=0

    Xbar-R Chart of C3

    2,432,422,412,402,392,382,372,36

    LSL USL

    Process Data

    S ample N 100

    StDev (Within) 0,0174181

    StDev (Ov erall) 0,017335

    LSL 2,37063

    Target *

    USL 2,41737

    Sample Mean 2,394

    Potential (Within) C apability

    CC pk 0,45

    O v erall C apability

    Pp 0,45

    P PL 0,45

    P PU 0,45

    Ppk

    C p

    0,45

    C pm *

    0,45

    C P L 0,45

    C P U 0,45

    C pk 0,45

    O bserv ed Performance

    PPM < LSL 150000,00

    PPM > USL 150000,00

    PPM Total 300000,00

    Exp. Within Performance

    PPM < LSL 89845,39

    PPM > USL 89845,39

    PPM Total 179690,78

    Exp. Ov erall Pe rformance

    PPM < LSL 88807,29

    PPM > USL 88807,29

    PPM Total 177614,58

    Within

    Overall

    Process Capability of C3

  • 8/10/2019 TUGAS PENGMUTTT

    5/5

    Kesimpulan:

    Karena Cp