Tabel Momen Kombinasi

2
DEPARTEMEN TEKNIK SIPIL FAKULTAS TEKNIK UNIVERSITAS SUMATERA UTARA Tugas : TUGAS STRUKTUR BETON Tabel Momen Total Akibat Beban Mati NO TUMPUAN MOMEN POSITIF (M + ) MOMEN NEGATIF (M - ) 1 BA - -16,224 h 2 -51,239 2 BC 29,048h 2 +60,169 -4,595 h 2 -7,693 3 CB 5,148 h 2 +12,640 -43,771 h 2 -73,626 4 CD 42,832 h 2 +72,390 -6,259 h 2 -12,479 5 DC 6,259 h 2 +12,479 -42,832 h 2 -72,390 6 DE 43,771 h 2 +73,626 -5,148 h 2 -12,640 7 ED 4,595 h 2 +7,693 -38,591 h 2 -76,148 8 EF 16,224 h 2 +51,239 - NAMA : LEDWIN ALWI ANGGARA NIM : 11 0404 134 HAL. :

description

a

Transcript of Tabel Momen Kombinasi

Page 1: Tabel Momen Kombinasi

DEPARTEMEN TEKNIK SIPILFAKULTAS TEKNIKUNIVERSITAS SUMATERA UTARA

Tugas : TUGAS STRUKTUR BETONTabel Momen Total Akibat Beban Mati

NO TUMPUAN MOMEN POSITIF (M+) MOMEN NEGATIF (M-)

1 BA - -16,224 h2-51,2392 BC 29,048h2+60,169 -4,595 h2-7,6933 CB 5,148 h2+12,640 -43,771 h2-73,6264 CD 42,832 h2+72,390 -6,259 h2-12,4795 DC 6,259 h2+12,479 -42,832 h2-72,3906 DE 43,771 h2+73,626 -5,148 h2-12,6407 ED 4,595 h2+7,693 -38,591 h2-76,1488 EF 16,224 h2+51,239 -

NAMA : LEDWIN ALWI ANGGARA NIM : 11 0404 134 HAL. :

Page 2: Tabel Momen Kombinasi