RAKER BTMP
description
Transcript of RAKER BTMP
RAKER BTMP
Berlian Resort, Sindanglaya Puncak15-16 Desember 2009
Project Kegiatan MP 2010
1. DIPA KOMPONEN MB2. DIPA BUS GANDENG3. DIPA RB PUNA4. PNBP (PENGUJIAN) :
– R83, BIODIESEL PERTAMINA, AIR QUALITY-JARI, R49 & R24, UJI ENGINE & GENSET, & UJI SEPEDA MOTOR
5. SISTEM MUTU ISO 170256. IN HOUSE RESEARCH : IDENTIF & DESAIN SIST TC (PLC,DATA
AKUSISI)7. PROG INTERNAL TRAINING8. PUSAT DESIGN OTOMOTIF
Detail In House Research MP
• Identifikasi & Desain TC (Dyno, data akusisi)• Sasaran : Identifikasi dan Desain TC sistem
(Dyno, Data akusisi)• Periode : 1 tahun.• Output : Detail Desain PLC
Project Kegiatan TPK 2010
1. DIPA ABSORPSI (WBS)2. DIPA (MEPPO) D,R & O SIST OTOM IND BAJA
(WP)3. IN HOUSE RESEARCH : RETROFIT BIOFUEL
PADA BURNER 4. REKONDISI LOOP 1-25. REVITALISASI INDUSTRI GULA (CE)
Project Kegiatan ST 2010
1. OPERASIONAL ; PERSIAPAN KEGIATAN PNBP2. PERAWATAN : FASILITAS UJI BTMP3. PENGEMBANGAN : ALAT UJI AC, PENAMB
ALAT DI MP
Project Kegiatan KPT 2010
1. MENUNJANG KALIB PERALATAN UJI BTMP2. PNBP (KALIBRASI SUHU, TEKANAN, FLOW)3. IN HOUSE RESEARCH : design wind tunnel
kalib velocitymeter
Training (Ekternal & Internal)
Lab MP :• Air quality (eksternal-JICA)• Bongkar pasang engine (magang industry)• ISO 17025• Ketidakpastian (internal)• Pabrikasi (eksternal-BLK)• Perawatan signal• Standard uji (R24 dll)
On the Job training (lab MP)
• Uji Test Cell• Peserta : Yogi, Mohktar, Anis, Heru, Dedi,
Henri, Kanon, Agus Wahidin & Agus Wijayanto
Training (Ekternal & Internal)
Lab TPK:• ITC Thermography • Desain HE (internal)
Umum :• Menulis/report teknis (Indonesia/English)• Bahasa Inggris, spesifik mis negosiasi• Penulisan proposal• Manajemen
Program Manual 2010 (Komponen)
• Partner : NEFA• Sasaran : Optimasi & Uji Diesel 8 PK• Target : Simulasi & Pengujian Engine (< 6
bulan)
Industri Baja (Program Internal)
• Topik : Design Requirement & Objective Sistem Otomasi Industri baja
• Sasaran : Data monitoring proses Industri baja