RECAPITULASI TOTALPOS SATPAM PERUMAHAN BILokasi : Sultan Alauddin, Makassar

No Uraian PekerjaanI PRELIMINARYII PEKERJAAN STRUKTURIII PEKERJAAN ARSITEKTURIVV PEKERJAAN INSTALASI LISTRIKVI PEKERJAAN SANITASIVIIVIIIXI

TOTALDIBULATKAN

Terbilang :

Page 2: MUH MARIFAT 60100114037

Jumlah Harga (Rp.) Rp -

#NAME?

#NAME?#NAME?

Page 3: MUH MARIFAT 60100114037

RENCANA ANGGARAN BIAYA (RAB)POS SATPAM PERUMAHAN BILokasi : Sultan Alauddin, Makassar

No Uraian Pekerjaan Vol Sat. Harga Satuan (Rp)

I PRELIMINARY1.1 Pekerjaan Pembersihan Area Pekerjaan

II PEKERJAAN STRUKTUR2.1 Pondasi Batu Kali2.1.1 Galian tanah 1.0080 m³ Rp - 2.1.2 Urugan Tanah Kembali 0.2520 m³ Rp - 2.1.3 Urugan Pasir 1.4000 m³ Rp 120,000.00 2.1.4 Pasangan Batu Kosong 2.8000 m³ Rp 250,800.00 2.1.5 Pasangan Batu Kali 4.7250 m³ Rp 282,240.20

2.1 Pondasi Batu Bata2.1.1 Galian tanah 0.0840 m³ Rp - 2.1.2 Urugan Tanah Kembali 0.0210 m³ Rp - 2.1.3 Urugan Pasir 0.3080 m³ Rp 120,000.00 2.1.5 Pasangan Batu Bata 9.2400 m³ Rp 67,040.20

2.3 Sloof 15/20 0.5250

2.4 Kolom 15/15 0.4725

2.5 Ringbalk 15/20 0.5250

3.7 Pekerjaan Atap2.6.1 Kuda 6/12 0.4108 m³2.6.2 Balok Angin 5/10 0.0350 m³2.6.3 Gording 6/12 0.5760 m³2.6.4 Kasau 5/7 0.3203 m³2.6.5 Reng 2/3 0.1056 m³2.6.6 Balok Bubungan 5/10 0.1012 m³

Bahan / Material (Rp.)

Page 4: MUH MARIFAT 60100114037

2.6.7 Papan Bubungan2/5 0.0202 m³2.6.8 Bubungan 20.2400 2.6.9 Listplank 2/30 0.3120 m³2.6.10 Penutup Atap 48.8000

III PEKERJAAN ARSITEKTUR3.1 Pekerjaan Lantai3.1.1 Urugan Pasir Bawah Lantai 7.5000 m³3.1.2 Pekerjaan Rabat Beton Bawah Lantai 1.5000 m³2.1.3 Campuran Spesi Bawah Tegel 0.1500 m³3.1.4 Pas. Tegel Lantai 40x40 15.0000 3.1.5 Pas. Tegel Lantai Teras 20x20 5.5200

3.2 Tegel Plint Lantai3.2.1 Pas. Tegel Plint 10x40 1.8100 3.2.2 Pas. Tegel Plint Teras 10x20 1.3400 3.2.3 Pas. Tegel Plint 40x40 WC 8.6400 3.2.3 Spesi Tegel 0.1179 m³

3.3 Trassram 0.9000 m³

3.4 Dinding 1.6668 m³

3.5 Pekerjaan Kusen3.5.1 Kusen Pintu P1a 0.3825 m³3.5.2 Kusen Pintu P1b 0.3825 m³3.5.2 Kusen Pintu P2 (WC) 0.3675 m³3.5.3 Kusen Jendela Sudut J1a 0.9000 m³3.5.3 Kusen Jendela Sudut J1b 0.9000 m³3.5.4 Ventilasi 0.3825 m³

3.6 Pekerjaan Plafond3.6.1 Rangka Plafond m³3.6.2 Penutup Plafond 40.0000 3.6.3 List Plafond 35.0000

3.8 Pekerjaan Finishing2.7.1 Pekerjaan Plesteran 42.7800 2.7.2 Acid dan Pengecatan Dinding 42.7800 2.7.4 Pengecatan Kusen 11.0500 2.7.5 Pengecatan Residu Kuda-Kuda 14.2625

m'

m²m²

m²m²m²

m²m'

m²m²m²m²

Page 5: MUH MARIFAT 60100114037

IV PEKERJAAN INTALASI LISTRIK

Page 6: MUH MARIFAT 60100114037

RENCANA ANGGARAN BIAYA (RAB)

Harga Satuan (Rp) Jumlah Harga

Upah (Rp.) Upah (Rp.)

Rp -

SUBTOTAL Rp -

Rp 3,346,992.92 Rp 32,000.00 Rp - Rp 32,256.00 Rp 32,256.00 Rp 15,360.00 Rp - Rp 3,870.72 Rp 3,870.72 Rp 21,000.00 Rp 168,000.00 Rp 29,400.00 Rp 197,400.00 Rp 97,575.00 Rp 702,240.00 Rp 273,210.00 Rp 975,450.00 Rp 170,250.00 Rp 1,333,584.95 Rp 804,431.25 Rp 2,138,016.20

Rp 1,160,784.41 Rp 32,000.00 Rp - Rp 2,688.00 Rp 2,688.00 Rp 15,360.00 Rp - Rp 322.56 Rp 322.56 Rp 21,000.00 Rp 36,960.00 Rp 6,468.00 Rp 43,428.00 Rp 53,560.00 Rp 619,451.45 Rp 494,894.40 Rp 1,114,345.85

Rp - Rp - Rp -

Rp - Rp - Rp -

Rp - Rp - Rp -

Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp -

Jumlah Bahan - Upah (Rp.) Bahan / Material

(Rp.)

Page 7: MUH MARIFAT 60100114037

Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp -

SUBTOTAL Rp 4,507,777.32

Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp -

Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp -

Rp - Rp - Rp -

Rp - Rp - Rp -

Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp -

Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp -

Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp -

Page 8: MUH MARIFAT 60100114037

SUBTOTAL Rp -

SUBTOTAL Rp -

Page 9: MUH MARIFAT 60100114037
Page 10: MUH MARIFAT 60100114037

Analisa Harga Satuan Bahan dan UpahPERUMAHAN BILokasi : Sultan Alauddin, Makassar

No Uraian Pekerjaan Koef. Sat.

I PRELIMINARY1.1 Pekerjaan Pembersihan Area Pekerjaan

II PEKERJAAN STRUKTUR2.1 Pondasi Batu Kali Max 1 m22.1.1 Galian Tanah Biasa m³

Pekerja Tak Terlatih 0.4000 OhMandor 0.0400 Oh

2.1.2 Urugan Tanah Kembali m³Pekerja Tak Terlatih 0.1920 OhMandor 0.0192 Oh

2.1.3 Urugan Pasir m³Pasir Urug 1.2000 m³Pekerja Tak Terlatih 0.3000 OhMandor 0.0100 Oh

2.1.4 Pasangan Batu Kosong m³Batu Belah 15/20 1.2000 m³Pasir Urug 0.3000 m³Pekerja Tak Terlatih 0.7800 OhTukang Batu 0.3900 OhKepala Tukang Batu 0.0390 OhMandor 0.0200 Oh

2.1.5 Pasangan Batu Kali 1 Pc : 2 Ps m³Batu Utuh 1.1000 m³Semen Pc (40 kg) 0.4352 ZakPasir Pasang 0.4270 m³Pekerja Tak Terlatih 1.5000 OhTukang Batu 0.6000 OhKepala Tukang Batu 0.0600 Oh

Page 11: MUH MARIFAT 60100114037

Mandor 0.0350 Oh

2.2 Pondasi Batu Bata2.1.1 Galian Tanah Biasa m³

Pekerja Tak Terlatih 0.4000 OhMandor 0.0400 Oh

2.1.2 Urugan Tanah Kembali m³Pekerja Tak Terlatih 0.1920 OhMandor 0.0192 Oh

2.1.3 Urugan Pasir m³Pasir Urug 1.2000 m³Pekerja Tak Terlatih 0.3000 OhMandor 0.0100 Oh

2.1.5 Pasangan Batu Bata 1 Pc : 2 Ps m³Batu Bata 70.0000 BuahSemen Pc (50 kg) 0.4352 zak

Pasir Pasang 0.0470 m³Pekerja Tak Terlatih 0.4290 OhTukang Batu 0.2140 OhKepala Tukang Batu 0.0210 OhMandor 0.0110 Oh

2.3 Sloof 15/20

2.4 Kolom 15/15

2.5 Ringbalk 15/20

2.6 Balok gantung Pintu Jendela

III PEKERJAAN ARSITEKTUR3.1 Pekerjaan Lantai3.1.1 Urugan Pasir Bawah Lantai3.1.2 Pekerjaan Rabat Beton Bawah Lantai2.1.3 Campuran Spesi Bawah Tegel3.1.4 Pas. Tegel Lantai 40x40

Page 12: MUH MARIFAT 60100114037

3.1.5 Pas. Tegel Lantai Teras 20x20

3.2 Tegel Plint Lantai3.2.1 Pas. Tegel Plint 10x403.2.2 Pas. Tegel Plint Teras 10x203.2.3 Pas Tegel Plint 40x40 WC3.2.3 Spesi Tegel

3.3 Trasram

3.2 Dinding

Page 13: MUH MARIFAT 60100114037

Analisa Harga Satuan Bahan dan Upah

Analisa Harga Satuan (Rp.) Harga Analisa (Rp.)

Upah (Rp.) Upah (Rp.)

SUBTOTAL

Rp - Rp 32,000.00 SNI Rp 65,000.00 Rp 26,000.00 SNI Rp 150,000.00 Rp 6,000.00

Rp - Rp 15,360.00 SNI Rp 65,000.00 Rp 12,480.00 SNI Rp 150,000.00 Rp 2,880.00

Rp 120,000.00 Rp 21,000.00 SNI Rp 100,000.00 Rp 120,000.00 SNI Rp 65,000.00 Rp 19,500.00 SNI Rp 150,000.00 Rp 1,500.00

Rp 250,800.00 Rp 97,575.00 SNI Rp 184,000.00 Rp 220,800.00 SNI Rp 100,000.00 Rp 30,000.00 SNI Rp 65,000.00 Rp 50,700.00 SNI Rp 100,000.00 Rp 39,000.00 SNI Rp 125,000.00 Rp 4,875.00 SNI Rp 150,000.00 Rp 3,000.00

Rp 282,240.20 Rp 170,250.00 SNI Rp 184,000.00 Rp 202,400.00 SNI Rp 51,000.00 Rp 22,195.20 SNI Rp 135,000.00 Rp 57,645.00 SNI Rp 65,000.00 Rp 97,500.00 SNI Rp 100,000.00 Rp 60,000.00 SNI Rp 125,000.00 Rp 7,500.00

Bahan / Material (Rp.)

Bahan / Material (Rp.)

Page 14: MUH MARIFAT 60100114037

SNI Rp 150,000.00 Rp 5,250.00

Rp - Rp 32,000.00 SNI Rp 65,000.00 Rp 26,000.00 SNI Rp 150,000.00 Rp 6,000.00

Rp - Rp 15,360.00 SNI Rp 65,000.00 Rp 12,480.00 SNI Rp 150,000.00 Rp 2,880.00

Rp 120,000.00 Rp 21,000.00 SNI Rp 100,000.00 Rp 120,000.00 SNI Rp 65,000.00 Rp 19,500.00 SNI Rp 150,000.00 Rp 1,500.00

Rp 67,040.20 Rp 53,560.00 SNI Rp 550.00 Rp 38,500.00 SNI Rp 51,000.00 Rp 22,195.20 SNI Rp 135,000.00 Rp 6,345.00 SNI Rp 65,000.00 Rp 27,885.00 SNI Rp 100,000.00 Rp 21,400.00 SNI Rp 125,000.00 Rp 2,625.00 SNI Rp 150,000.00 Rp 1,650.00

SUBTOTAL

Page 15: MUH MARIFAT 60100114037

SUBTOTAL

Page 16: MUH MARIFAT 60100114037

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 201516

STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJAPEMERINTAH PROVINSI SULAWESI SELATAN

MAKASSAR, GOWA, TAKALAR DAN JENEPONTOTAHUN 2015

Dalam Rupiah (Rp)

NO JENIS BAHAN SATUAN MAKASSAR GOWA TAKALAR JENEPONTO

BAHAN DASAR1 Batu Kali

Utuh M³ 184,000 142,000 147,000 157,000

Batu pecah 7 - 10 cm M³ 237,000 232,000 268,800 247,000

Batu pecah 5 - 7 cm M³ 256,000 247,000 268,800 267,000

Batu pecah 3 - 5 cm M³ 262,000 252,000 273,600 272,000

Batu pecah 2 - 3 cm M³ 267,000 257,000 262,000 277,000

Batu pecah 1 - 2 cm M³ 272,000 262,000 288,000 282,000

Batu pecah 0.51 - 1 cm M³ 317,000 267,000 297,600 287,000

2 Batu Merah Buah 550 500 575 600

3 Batu Gunung M³ 167,000 155,000 150,000 170,000

4 Batu AlamAndesit Biasa M² 186,000 186,500 187,000 187,500

Andesit Susun Sirih M² 285,000 285,500 286,000 286,500

Andesit Halus M² 185,000 185,500 186,000 186,500

Andesit Gelombang M² 196,000 196,500 197,000 197,500

Batu Candi Permukaan Rata M² 175,000 175,500 176,000 176,500

Batu Palimanan Kuning M² 180,000 180,500 181,000 181,500

Batu Hijau Sukabumi M² 170,000 170,500 171,000 171,500

Batu Bali Green M² 166,000 166,500 167,000 167,500

Batu Bali Napoli M² 185,000 185,500 186,000 186,500

Paras Jokja Besar M² 180,000 180,500 181,000 181,500

Batu Cirebon Beraturan M² 170,000 170,500 171,000 171,500

Batu Cirebon Tidak Beraturan M² 125,000 125,500 126,000 126,500

5 Tanah Timbunan M³ 110,000 100,000 105,000 105,000

6 PasirTimbunan / Urug M³ 100,000 83,000 88,000 93,000

Pasangan M³ 135,000 100,000 110,000 112,000

Beton M³ 148,000 130,000 134,000 154,000

7 Kerikil M³ 277,000 272,000 282,000 287,000

8 Sirtu M³ 177,000 158,000 162,000 167,000

9 Kapur Pasangan Zak 60,000 63,000 64,000 66,000

10 Semen PC (40 kg) Zak 51,000 49,000 49,500 50,000

11 Semen Putih (50 Kg) Zak 53,000 53,500 54,000 54,500

12 M³ 1,200,000 1,205,000 1,210,000 1,215,000

13 Semen Prime Mortar

PM 110 (40 Kg) Perekat Zak 75,000 75,500 76,000 76,500

PM 210 (50 Kg) Plesteran Zak 65,000 65,500 66,000 66,500

PM 310 (40 Kg) Acian Zak 65,000 65,500 66,000 66,500

14 Paving Blok Mutu (K 175)Tebal 6 Cm M² 55,000 56,000 57,000 58,000

Tebal 8 Cm M² 60,000 61,000 62,000 63,000

Bata Ringan/Hebel(60x20x7,5 s/d 20)

Page 17: MUH MARIFAT 60100114037

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 201517

Dalam Rupiah (Rp)

NO JENIS BAHAN SATUAN MAKASSAR GOWA TAKALAR JENEPONTO

Berlian M² 51,000 52,000 53,000 54,000

15 Paving Blok Mutu (K 225) Tebal 6 Cm M² 59,000 60,000 61,000 62,000

Tabal 8 Cm M² 62,000 63,000 64,000 65,000

16 Paving Blok Mutu ( K 300)Tebal 6 Cm M² 60,000 61,000 62,000 63,000 Tebal 8 cm M² 65,000 66,000 67,000 68,000

17 Paving Blok Mutu (K 400) M² 75,000 76,000 77,000 78,000

18 Topiuskup (K 225) biji 4,200 4,700 5,200 5,700

19 Kanstin 20x25x50 biji 37,000 38,000 39,000 40,000

20 Buis Betond=20 cm Biji 215,000 225,000 235,000 245,000 d=30 cm Biji 256,000 266,000 276,000 286,000 d=40 cm Biji 326,500 336,500 346,500 356,500 d=50 cm Biji 386,000 396,000 406,000 416,000 d=60 cm Biji 442,000 452,000 462,000 472,000

BAHAN KAYU1 Kayu Kelas I

Balok Gergaji Sawmil M³ 9,550,000 10,050,000 10,300,000 10,550,000

Papan Gergaji Sawmil M³ 10,050,000 10,550,000 10,550,000 10,750,000

Balok Gergaji Sansaw M³ 8,550,000 8,650,000 8,750,000 8,850,000

Papan Gergaji Sansaw M³ 8,650,000 8,850,000 8,800,000 8,850,000

2 Kayu Kelas IIBalok M³ 4,550,000 4,800,000 4,850,000 4,050,000

Papan M³ 4,850,000 4,650,000 4,700,000 4,850,000

3 Kayu Kelas IIIBalok M³ 2,800,000 2,850,000 2,900,000 3,000,000

Papan M³ 3,275,000 3,425,000 3,475,000 3,625,000

BAHAN LANTAITegel KeramikPutih 10 X 20 cm Dos 45,000 45,500 46,000 46,500 Warna 10 X 20 cm Dos 47,000 47,500 48,000 48,500 Putih 20 X 20 cm Dos 60,000 60,500 61,000 61,500 Warna 20 X 20 cm Dos 65,000 65,500 66,000 66,500 Putih 20 X 25 cm Dos 60,000 60,500 61,000 61,500 Warna 20 X 25 cm Dos 65,000 65,500 66,000 66,500 Putih 30 X 30 cm Dos 50,000 50,500 51,000 51,500 Warna 30 X 30 cm Dos 60,000 60,500 61,000 61,500 Putih 40 X 40 cm Dos 55,000 55,500 56,000 56,500 Warna 40 X 40 cm Dos 65,000 65,500 66,000 66,500 Warna 50 x 50 cm Dos 135,000 135,500 136,000 136,500 Warna 60 x 60 cm Dos 175,000 175,500 176,000 176,500

BAHAN KACAKaca Bening 3 mm Mtr 100,000 100,500 105,000 105,500 Kaca Bening 5 mm Mtr 125,000 125,500 157,500 158,000

Page 18: MUH MARIFAT 60100114037

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 201518

Dalam Rupiah (Rp)

NO JENIS BAHAN SATUAN MAKASSAR GOWA TAKALAR JENEPONTO

Kaca Buram 3 mm Mtr 100,000 100,500 157,500 158,000 Kaca Buram 5 mm Mtr 110,000 110,500 168,000 168,500 Kaca Ryben 3 mm Mtr 150,000 150,500 157,500 158,000 Kaca Ryben 5 mm Mtr 175,000 175,500 176,000 176,500 Rangka Nako Lengkap Terali 7 mata Set/daun 350,000 350,500 351,000 351,500

BAHAN BESI

1 Besi BetonØ 4 mm Btg 24,000 24,500 25,000 25,500 Ø 6 mm Btg 35,000 35,500 36,000 36,500 Ø 8 mm Btg 50,000 50,500 51,000 51,500 Ø 10 mm Btg 75,000 75,500 76,000 76,500 Ø 12 mm Btg 106,000 106,500 107,000 107,500 Ø 14 mm Btg 131,000 131,500 132,000 132,500 Ø 16 mm Btg 165,000 165,500 166,000 166,500 Ø 19 mm Btg 210,000 222,500 235,000 235,500 Ø 22 mm Btg 325,000 325,500 326,000 326,500

2 Besi Ulird = 13 mm Btg 110,000 110,500 111,000 111,500 d = 16 mm Btg 165,000 165,500 166,000 166,500 d = 19 mm Btg 227,000 227,500 228,000 228,500

3 Paku Paku Biasa Kg 17,500 18,000 19,500 20,000 Paku Asbes Kg 45,000 45,500 46,000 46,500 Paku Seng (payung) RRT Dos 21,000 23,500 26,000 28,500 Paku skrup 3 ½ inci Dos 15,000 15,100 15,200 15,300 Paku Skrup 4 Inci Dos 15,000 15,100 15,600 15,700 Paku Payung Berulir 75 mm Kg 35,500 36,000 36,500 37,000 Paku Sirap Kg 20,000 20,500 21,000 21,500 Paku Beton Hitam Dos 43,500 44,000 44,500 45,000 Paku Beton Putih Dos 27,500 28,000 28,500 29,000

4 KawatBeton Kg 21,000 21,500 22,000 22,500 Nyamuk Mtr 30,000 30,500 31,000 31,500 Ayakan Kecil mtr 26,000 26,500 27,000 27,500 Duri roll 153,000 154,000 155,000 156,000

5 Besi Plat2mm=120x240 mm Lbr 410,000 420,000 430,000 435,000 3 mm = 120 X 240 mm Lbr 520,000 530,000 540,000 545,000 Besi H 15 cm Panjang 12 m Btg 4,750,000 4,775,000 4,805,000 4,855,000

6 Besi Strep30.3 mm Btg 34,000 34,500 35,000 35,500 35.4 mm Btg 55,000 55,500 56,000 56,500 46.4 mm Btg 105,000 105,500 106,000 106,500 40.6 mm Btg 75,000 75,500 76,000 76,500 50.6 mm Btg 130,000 130,500 131,000 131,500

7 Besi Siku30.30.3 Btg 76,400 76,900 77,400 77,900

Page 19: MUH MARIFAT 60100114037

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 201519

Dalam Rupiah (Rp)

NO JENIS BAHAN SATUAN MAKASSAR GOWA TAKALAR JENEPONTO

40.40.4 Btg 146,000 146,500 147,000 147,500 40.40.3 Btg 65,500 66,000 66,500 67,000 50.50.4 Btg 101,000 101,500 102,000 102,500 50.50.5 Btg 230,000 230,500 231,000 231,500 60.60.6 Btg 301,000 311,000 321,000 331,000 70.70.7 Btg 351,000 356,000 361,000 366,000

8 Besi 6 mm Mtr 20,000 20,500 21,000 21,500 9 Besi Tipe C (Rangka Baja Ringan) 6 m

Lebar 10, tebal, 1,8 -2,00 mm Btg 138,000 139,000 140,000 141,000 Lebar 12,5, tebal 1,8 -2,00 mm Btg 165,000 166,000 167,000 168,000 Lebar 15,Tebal 1,8 – 2,00 mm Btg 220,000 221,000 222,000 223,000

BAHAN PIPA

1 Pipa Besi GIPؽ Inci – 6 m Btg 128,500 129,500 130,500 131,500 Ø ¾ Inci – 6 m Btg 120,000 121,000 122,000 123,000 Ø 1Inci – 6 m Btg 252,500 253,500 254,500 255,500 Ø 2 Inci – 6 m Btg 550,000 555,000 565,000 575,000 Ø 2 ½ Inci – 6 m Btg 900,000 905,000 910,000 920,000 Ø 3 Inci – 6 m Btg 1,150,000 1,175,000 1,200,000 1,225,000

2 Pipa PVC Air Bersih Ø ½ Inci – 6 m Btg 22,500 23,000 23,500 24,000 Ø ¾ Inci – 6 m Btg 32,000 32,500 33,000 33,500 Ø 1 Inci – 6 m Btg 44,000 44,500 45,000 45,500 Ø 1½ Inci – 6 m Btg 102,690 103,190 103,690 104,190 Ø 2 Inci – 6 m Btg 130,500 131,500 132,500 133,500 Ø 2 ½ Inci – 6 m Btg 186,800 187,800 188,800 189,800 Ø 3 Inci – 6 m Btg 135,400 136,400 137,400 138,400 Ø 4 Inci – 6 m Btg 400,000 405,000 410,000 420,000 Ø 6 Inci – 6 m Btg 855,700 864,700 884,700 904,700 Ø 8 Inci – 6 m Btg 1,405,000 1,445,000 1,495,000 1,545,000 Ø 10 Inci – 6 m Btg 2,232,250 2,248,250 2,298,250 2,348,250

3 Pipa untuk Saluran Pembuangan Air Ø ½ Inci – 4 m Btg 22,500 23,000 23,500 24,000 Ø ¾ Inci – 4 m Btg 27,500 28,000 28,500 29,000 Ø 1 Inci – 4 m Btg 33,500 34,000 34,500 35,000 Ø 1 ½ Inci – 4 m Btg 96,500 97,000 97,500 98,000 Ø 2 Inci – 4 m Btg 152,500 153,000 153,500 154,000 Ø 2 ½ Inci – 4 m Btg 220,000 220,500 221,000 221,500 Ø 3 Inci – 4 m Btg 315,000 316,000 317,000 318,000 Ø 4 Inci – 4 m Btg 473,000 476,000 481,000 491,000 Ø 5 Inci – 4 m Btg 764,500 767,500 777,500 782,500 Ø 6 Inci – 4 m Btg 1,011,000 1,105,000 1,205,000 1,305,000 Ø 10 Inci – 4 m Btg 2,461,000 2,505,000 2,555,000 2,605,000

4 Pipa Untuk Instalasi ListrikØ 5/8 Inci – 4 m Btg 15,500 16,000 16,500 17,000 Ø ¾ Inci – 4 m Btg 25,500 26,000 26,500 27,000 Ø 1 Inci – 4 m Btg 32,500 33,000 33,500 34,000

Page 20: MUH MARIFAT 60100114037

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 201520

Dalam Rupiah (Rp)

NO JENIS BAHAN SATUAN MAKASSAR GOWA TAKALAR JENEPONTO

Ø 1 ½ Inci – 4 m Btg 96,500 97,000 97,500 98,000

BAHAN LANGIT-LANGIT

1 Eternit 100 X 100 Set 18,500 19,000 19,500 20,000 2 Tripleks

122 X 244 x 0.2 cm Lbr 52,500 53,000 53,500 54,000 122 X 244 x 0.3 cm Lbr 70,000 70,500 71,000 71,500 122 X 244 x 0.6 cm Lbr 98,000 100,000 100,500 101,000 122 X 244 x 0.9 cm Lbr 130,000 130,500 131,000 131,500

3 Tripleks Melamin122 X 244 x 0.3 cm Lbr 85,500 86,000 86,500 87,000

4 Accoustic 40 X 60 Lbr 55,500 56,000 56,500 57,000 5 Teakwood

80 X 244 x 0.3 cm Lbr 92,000 92,500 93,000 93,500 122 X 244 x 0.3 cm Lbr 96,500 97,000 97,500 98,000 Karsiboard Lbr 70,000 70,500 71,000 71,500 Gypsum Lbr 63,500 64,000 64,500 65,000 Les gipsum Lbr 29,500 30,000 30,500 31,000

6 Hard Board 122 X 244 cm Lbr 77,000 77,500 78,000 78,500 7 Asbes Plat Harfeks

200 X 100 X 0.3 cm Lbr 48,500 49,000 49,500 50,000 8 List Profil

2 x 3 cm / 4 m Btg 11,500 12,000 12,500 13,000 3 x 3 cm / 4 m Btg 15,500 16,000 16,500 17,000 4 x 4 cm / 4 m Btg 19,500 20,000 20,500 21,000 4 x 5 cm / 4 m Btg 25,500 26,000 26,500 27,000

BAHAN ATAP1 Genteng

Beton Biji 33,500 34,000 34,500 35,000 Keramik Bh 16,000 16,500 17,000 17,500 Asbes gelombang 7 kaki Lbr 60,000 60,500 61,000 61,500 Harfles (115X85x0.5 cm) Lbr 63,000 63,500 64,000 64,500

2 Atap Metal lbr 87,000 87,500 88,000 88,500 3 Asbes Genteng Lbr 72,500 73,000 73,500 74,000 4 Sirap Ikat 305,000 310,000 315,000 320,000 5 Seng gelombang kecil

BJLS 0.20 mm Kaki 7,000 7,500 8,000 8,500 BJLS 0.22 mm Kaki 7,500 8,000 8,500 9,000 BJLS 0.30 mm Lbr 54,000 54,500 55,000 55,500 BJLS 0.35 mm Lbr 70,500 71,000 71,500 72,000

6 Atap BitumenBitumen Gel.Acrylic Base(200x95x0,23 cm) Lbr 173,800 174,300 174,800 175,300 Lisplank Acrylic Bace (104x34x023cm) Lbr 101,200 101,700 102,200 102,700 Nok Acrylic Base (50x104x0.23 Cm) Lbr 101,200 101,700 102,200 102,700 Sekrup Atap 6,5 cm Bh 1,200 1,200 1,300 1,400 Sekrup Nok 6,5 cm Bh 1,200 1,200 1,300 1,400 Talang Air Acrylic Bace (104x50x0.23cm) Lbr 101,200 101,700 102,200 102,700

Page 21: MUH MARIFAT 60100114037

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 201521

Dalam Rupiah (Rp)

NO JENIS BAHAN SATUAN MAKASSAR GOWA TAKALAR JENEPONTO

Bh 1,350 1,450 1,550 1,650 Bitumen Genteng (106x40x0,3 Cm) Lbr 70,000 70,500 71,000 71,500

Lbr 343,000 343,500 344,000 344,500 7 Seng Plat

BJLS 0.30 mm 40x180 Lbr 65,000 65,500 66,000 66,500 BJLS 0.35 mm Lbr 75,000 75,500 76,000 76,500

8 Seng Super Deck180 X 70 cm – 10 kaki Kaki 13,000 13,500 14,000 14,500

9 Seng Aluminium GelombangSWG 32” 0.27 mm Kaki 9,500 10,000 10,500 11,000 SWG 30” 0.31 mm Kaki 12,000 12,500 13,000 13,500 SWG 28” 0.38 mm Kaki 13,000 13,500 14,000 14,500

10 Seng Plastik (Fiber) Kaki 13,500 14,000 14,500 15,000 11 Fiber Semen (Harflex)

Super 240 X 108 X 0.6 cm Lbr 79,000 79,500 80,000 80,500 Super 180 X 108 X 0.6 cm Lbr 65,000 65,500 66,000 66,500 Ekonomi 240 X 92 X 0.5 cm Lbr 69,500 70,000 70,500 71,000 Ekonomi 180 X 92 X 0.4 cm Lbr 63,000 63,500 64,000 64,500 Mini 240 X 105 X 0.4 cm Lbr 62,500 63,000 63,500 64,000 Mini 180 X 92 X 0.5 cm Lbr 71,000 71,500 72,000 72,500 Super 240 X 105 X 0.4 cm Lbr 66,500 67,000 67,500 68,000 Super 180 X 105 X 0.4 cm Lbr 69,000 69,500 70,000 70,500

12 Nok/Bubungan Genteng Beton Bh 35,500 36,000 36,500 37,000 Genteng Asbes Bh 55,500 56,000 56,500 57,000 Genteng Keramik Bh 20,500 21,000 21,500 22,000 Alm. SWG 28” -180 cm Lbr 45,000 45,500 46,000 46,500 Alm. SWG 28” –105 cm Lbr 40,000 40,500 41,000 41,500

13 Nok Steel GelombangSuper – 180 cm Bh 52,500 53,000 53,500 54,000 Mini – 105 cm Bh 41,500 42,000 42,500 43,000 Ekonomi – 95 cm Bh 19,000 19,500 20,000 20,500

14 Nok Steel RataSuper – 108 cm Bh 30,000 30,500 31,000 31,500 Mini – 105 cm Bh 25,500 26,000 26,500 27,000 Ekonomi – 95 cm Bh 21,000 21,500 22,000 22,500

15 Nok ½ Lingkaran Bh 40,500 41,000 41,500 42,000 16 Karet Pelapis Genteng

Ukuran 55 mtr 9,500 10,000 10,500 11,000 Ukuran 90 Mtr 19,000 19,500 20,000 20,500

BAHAN PENGGANTUNG

1 Kunci Tanam 1 Slag Bh 173,000 173,500 174,000 174,500 Double Slag Bh 307,000 311,000 316,000 321,000

2 PenggantungHak Angin Kecil Bh 10,500 11,000 11,500 12,000 Hak Angin Besar Bh 15,500 16,000 16,500 17,000 Grendel Kecil Bh 13,500 14,000 14,500 15,000

Sekrup Durafit (Ø 0.355cm - 6,5 cm)

Fiber Glass Gel. (transparan) 200x95x0.23cm

Page 22: MUH MARIFAT 60100114037

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 201522

Dalam Rupiah (Rp)

NO JENIS BAHAN SATUAN MAKASSAR GOWA TAKALAR JENEPONTO

Grendel Besar Bh 17,500 18,000 18,500 19,000 Engsel Pintu Bh 35,500 36,000 36,500 37,000 Engsel Jendela Bh 26,000 26,500 27,000 27,500 Expanyolet Bh 125,000 125,500 126,000 126,500

BAHAN SANITERKloset Jongkok Bh 230,000 235,000 240,000 245,000 Kloset Duduk Bh 2,000,000 2,005,000 2,010,000 2,015,000 Wasthafel warna Bh 475,000 480,000 485,000 490,000 Wasthafel cuci piring logam Bh 451,000 456,000 461,000 466,000 Pompa Mesin Bh 1,800,000 1,825,000 1,850,000 1,875,000 Urinoir lengkap Bh 1,500,000 1,525,000 1,550,000 1,555,000 Bak Mandi fiber Bh 755,000 760,000 765,000 770,000 Reservoir fiber = 1 m3 Bh 1,255,000 1,265,000 1,270,000 1,275,000 Reservoir Stainless stell = 1 m3 Bh 3,400,000 3,450,000 3,500,000 3,550,000 Stop Kran Bh 25,000 26,000 27,000 28,000 Kran Air Bh 20,000 20,500 21,000 21,500

BAHAN FINISHING/CAT

1 Cat Tembok Cat Dasar 5 Kg 60,000 61,000 62,000 63,000 Cat Kilap 5 Kg 90,000 91,000 92,000 158,000

2 Cat Kayu Cat Dasar Kg 20,000 20,500 21,000 21,500 Cat Kilap Ltr 61,000 61,500 62,000 62,500 Palatone Ltr 50,500 51,000 51,500 52,000 ICI Kg 75,500 76,000 76,500 77,000 Politur Kg 51,000 51,500 52,000 52,500 Meni 4 Kg 65,500 66,000 66,500 67,000 Minyak Cat Ltr 10,000 10,500 11,000 11,500

3 Cat AtapCat Dasar Kg 30,000 30,500 31,000 31,500 Cat Kilap Ltr 90,000 90,500 91,000 91,500 Lem Seng Ltr 13,000 13,500 14,000 14,500 Amplas/Kertas Gosok M 12,000 12,500 13,000 13,500 Dempul Kg 31,000 31,500 32,000 32,500 Residu 10 ltr 64,000 64,500 65,000 65,500

BAHAN INSTALASI LISTRIKKabel Listrik

1 Type NYA (Full)1 ½ mm Roll 301,000 301,500 302,000 302,500 2 ½ mm Roll 386,000 391,000 396,000 401,000

2 Type NYY2 X 1 ½ mm Roll 612,000 627,000 632,000 637,000 2 X 2 ½ mm Roll 762,000 772,000 777,000 782,000 2 X 4 mm Roll 652,000 657,000 662,000 667,000

3 Lampu TL

Page 23: MUH MARIFAT 60100114037

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 201523

Dalam Rupiah (Rp)

NO JENIS BAHAN SATUAN MAKASSAR GOWA TAKALAR JENEPONTO

1 X 20 W Bh 94,000 94,500 95,000 95,500 2 X 20 W Bh 123,000 123,500 124,000 124,500 1 X 40 W Bh 117,000 117,500 118,000 118,500 2 X 40 W Bh 150,000 150,500 151,000 151,500

4 Lampu Pijar25 W Bh 32,000 32,500 33,000 33,500 40 W Bh 56,000 56,500 57,000 57,500 60 W Bh 106,000 106,500 107,000 107,500 100 W Bh 188,000 188,500 189,000 189,500 Lampu Taman Mercury Bh 354,000 359,000 364,000 369,000

5 Saklar PhaseTunggal Putih Bh 23,000 23,500 24,000 24,500 Tunggal Hitam Bh 18,000 18,500 19,000 19,500 Double Putih Bh 26,000 26,500 27,000 27,500 Double Hitam Bh 21,000 21,500 22,000 22,500

6 Stop KontakHitam Bh 26,000 26,500 27,000 27,500 Putih Bh 28,000 28,500 29,000 29,500

7 Zekering Kast Lokal BiasaLokal 2 Group Automat Bh 83,000 83,500 84,000 84,500 Lokal 3 Group Biasa Bh 95,500 96,000 96,500 97,000 Fitting Bh 15,500 16,000 16,500 17,000

BAHAN JALANAspal Kg 15,000 15,500 16,000 16,500 Minyak Tanah Ltr 10,000 10,500 11,000 11,500 Minyak Solar Ltr 4,500 5,000 5,500 6,000 Minyak Pelumas Ltr 28,000 28,500 29,000 29,500

UPAH KERJAPekerja Tidak Terampil Org/hr 65,000 65,000 65,000 65,000

Pekerja Terampil Org/hr 75,000 75,000 75,000 75,000

Pembantu Masinis Org/hr 80,000 80,000 80,000 80,000

Penjaga Gudang Org/hr 100,000 100,000 100,000 100,000

Penjaga Malam Org/hr 100,000 100,000 100,000 100,000

Tukang :Tukang Kayu Org/hr 100,000 100,000 100,000 100,000

Tukang Batu Org/hr 100,000 100,000 100,000 100,000

Tukang Cat Org/hr 100,000 100,000 100,000 100,000

Tukang Listrik Org/hr 100,000 100,000 100,000 100,000

Tukang Pipa Org/hr 100,000 100,000 100,000 100,000

Tukang Besi Org/hr 100,000 100,000 100,000 100,000

Kepala TukangKepala Tukang Kayu Org/hr 125,000 125,000 125,000 125,000

Kepala Tukang Batu Org/hr 125,000 125,000 125,000 125,000

Kepala Tukang Listrik Org/hr 125,000 125,000 125,000 125,000

Kepala Tukang Cat Org/hr 125,000 125,000 125,000 125,000

Kepala Tukang Pipa Org/hr 125,000 125,000 125,000 125,000

Page 24: MUH MARIFAT 60100114037

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 201524

Dalam Rupiah (Rp)

NO JENIS BAHAN SATUAN MAKASSAR GOWA TAKALAR JENEPONTO

Kepala Tukang Besi Org/hr 125,000 125,000 125,000 125,000

Mandor Org/hr 150,000 150,000 150,000 150,000

Page 25: MUH MARIFAT 60100114037

VOLUME SATUAN BANGUNANPOS SATPAM PERUMAHAN BILokasi : Sultan Alauddin, Makassar

Banguan Utama TERAS

Panjang Denah Tinggi Denah Keliling Terasx y 3.0000 m x y5 3 5.4 0.43 3 5.4 0.42 1.5 Total Panjang 0 3.8

10 7.5 17.5000 m 10.8 4.6

I STRUKTUR

Utama Teras

Luas Penampang Volume Luas Penampang

Galian Tanah Galian Tanah Teras1.12 0.9 1.0080 0.28 0.30.8 0.2

Urugan Pasir Urugan Pasir Teras0.8 0.1 1.4000 m³ 0.2 0.1

Batu Kosong0.8 0.2 2.8000 m³

Pondasi Batu Kali Pondasi Batu Bata0.3 0.6 4.7250 m³ 0.60.6

Sloof Pekerjaan Kuda Kuda0.15 0.2 0.5250 m³

Luas Penampang PanjangKolom

0.15 0.15 0.4725 m³ Balok Tarik 6/12Jumlah 7 0.06 0.12 5

Jumlah 3Ring Balk Tiang Raja 6/12

0.15 0.2 0.5250 m³ 0.06 0.12 1.75Jumlah 2Balok Gapit 2x 6/12

0.06 0.12 0.875

Page 26: MUH MARIFAT 60100114037

Jumlah 12Balok Kunci 6/12

0.06 0.12 0.2Jumlah 3Balok Sokong 6/12

0.06 0.12 1.525Jumlah 6Kaki Kuda 6/12

0.06 0.12 3.05Jumlah 6Balok Angin 5/10

0.05 0.1 3.5Jumlah 2Gording 6/12

0.06 0.12 8Jumlah 10Kasau 5/7

0.05 0.07 3.05Jumlah 30Reng 2/3

0.02 0.03 8Jumlah 22Balok Bubungan 5/10

0.05 0.1 20.24II Pekerjaan Arsitektur Jumlah 1

Papan 2/5Plafond 0.02 0.05 20.24

Jumlah 1Luas Penampang Panjang Luas Bubungan

20.24Rangka Plafond Jumlah 1

- m³ Listplank 2/300.02 0.3 26

Penutup Plafond Jumlah 28 5 40.0000 Atap Genteng

List Plafond 6.1 8 35.0000

Pekerjaan Lantai Khusus Plint

Luas Penampang Volume/L Luas Penampang

Urugan Pasir Bawah Lantai All Spesi Tegel Plint

5 3 7.5000 m³ Luas Total 11.79Tebal 0.5 Tebal 0.01

m'

Page 27: MUH MARIFAT 60100114037

Rabat Beton Plint Wc 40x405 3 1.5000 m³ 7.2 1.2

Tebal 0.1

Spesi Bawah Tegel Plint Wc 10x405 3 0.1500 m³ 7.2 0.1

Tebal 0.01

Tegel Lantai 40x40 Plint Lantai 10x405 3 15.0000 m² 10.9 0.1

Lantai Teras 20x20 Plint Teras 10x203.8 0.4 5.5200 m² 13.4 0.15 0.45 0.4

Trassram Dinding

Luas Penampang Panjang Volume Luas Penampang Panjang

Trassram Dinding0.12 0.5 8.7 0.5220 m³ 0.12 1.5 10.5

15.75 m2Trassram WC Dinding WC

0.12 0.5 6.3 0.3780 m³ 0.12 1.5 710.5 m2

Pekerjaan Kusen Pengecetan

Luas Penampang Panjang Volume Lebar Penampang Panjang

Kusen Pintu P1 Kusen0.15 0.5 5.1 0.3825 m³ 0.25 44.2

Kusen Pintu P1b0.15 0.5 5.1 0.3825 m³ Kuda-Kuda

Kusen Jendela J1 0.25 57.050.15 0.5 12 0.9000 m³

Kusen Jendela J1b0.15 0.5 12 0.9000 m³

Pintu Kusen Pintu P20.15 0.5 4.9 0.3675 m³

Ventilasi0.15 0.5 5.1 0.3825 m³

Page 28: MUH MARIFAT 60100114037

VOLUME SATUAN BANGUNANPOS SATPAM PERUMAHAN BI

P. Trassram Tinggi Teras 10.5 0.4000 m P Trassram Wc

7

Total P. Teras Lebar Kusen jml 15.4000 m 0.9 2

0.7 1

Volume

0.0840 m³

0.3080 m³ 3 3 3 10.9 m0.7 0.6 0.6 40x101.5 0 0

3 5 5 13.4 m0.2 0.2 20x10

9.2400 m²0.7 2 3 7.2 m

1.5 wc

Volume

0.1080 m³

0.0252 m³

0.0756 m³

Page 29: MUH MARIFAT 60100114037

0.0043 m³

KUD

A KU

DA

0.0659 m³

0.1318 m³

0.0350 m³

0.5760 m³

0.3203 m³

0.1056 m³

0.1012 m³

0.0202 m³

0.3120 m³

48.8000

Volume/L

0.1179 m³

m'

Page 30: MUH MARIFAT 60100114037

8.6400 m²

0.7200 m²

1.0900 m²

1.3400 m²

Khusus Dinding jml m2Luas Lubang Pintu

Volume 0.9 1.5 2 2.7Luas lubang Pintu WC

0.7 0.6 1 0.42 0.4860 m³ Luas Jendela

1.5 1.5 4 9Luas Ventilasi

1.1808 m³ 0.6 0.4 1 0.24

Luas

11.0500

14.2625

Page 31: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 31+29

ANALISA SATUAN PEKERJAANSTANDAR NASIONAL INDONESIA

TAHUN 2015

NO. URAIAN KOEF SAT. HARGA SAT. JUMLAH

1 2 3 4 5 6 = ( 3 x 5 )A.01.06 1 M1 PENGUKURAN DAN PASANGAN BOUWPLANK

BAHAN :Kayu 5/7 Albasiah 0.0100 2,000,000.00 20,000.00 Paku Biasa 2"-5" 0.0200 Kg 16,400.00 328.00 Kayu Papan 3/20 Kayu Albasiah 0.0070 2,009,100.00 14,063.70 Jumlah Bahan 34,391.70 UPAH :Pekerja 0.1000 Oh 60,000.00 6,000.00 Tukang Kayu 0.1000 Oh 75,000.00 7,500.00 Kepala Tukang 0.0100 Oh 95,000.00 950.00 Mandor 0.0050 Oh 100,000.00 500.00 Jumlah Pekerja 14,950.00 Jumlah Bahan + Pekerja 49,341.70 Keuntungan Max. 10 % 4,934.17 Jumlah Total 54,275.87 Dibulatkan 54,270.00

A.01.10 1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAANBAHAN :

- -

Jumlah Bahan - UPAH :Pekerja 0.1000 Oh 60,000.00 6,000.00 Mandor 0.0500 Oh 100,000.00 5,000.00 Jumlah Pekerja 11,000.00 Jumlah Bahan + Pekerja 11,000.00 Keuntungan Max. 10 % 1,100.00 Jumlah Total 12,100.00 Dibulatkan 12,100.00

A.01.07 1 M2 PEMBUATAN DIREKSI KEET DAN LOS BAHANBAHAN :Kayu Albasiah 0.0800 m³ 2,000,000.00 160,000.00 Paku 4 - 7 0.2500 kg 16,400.00 4,100.00 Seng Glb BJLS 28 ( 80 x 180 cm ) 0.6200 lbr 23,900.00 14,818.00 Triplex 3 mm 0.5000 lbr 91,700.00 45,850.00 PC (50 kg) 0.1000 zak 90,900.00 9,090.00 Pasir pasang 0.2500 m³ 118,200.00 29,550.00 Bata merah 70.0000 bh 400.00 28,000.00 Jumlah Bahan 291,408.00 UPAH :Ongkos Pasang 0.1500 ls 291,408.00 43,711.20 Jumlah Pekerja 43,711.20 Jumlah Bahan + Pekerja 335,119.20 Keuntungan Max. 10 % 33,511.92 Jumlah Total 368,631.12 Dibulatkan 368,630.00

A.01.12 1 M3 BONGKARAN BETON BERTULANGBAHAN :

- -

Jumlah Bahan - UPAH :Pekerja 6.6670 Oh 60,000.00 400,020.00 Mandor 0.3330 Oh 100,000.00 33,300.00 Jumlah Pekerja 433,320.00 Jumlah Bahan + Pekerja 433,320.00 Keuntungan Max. 10 % 43,332.00 Jumlah Total 476,652.00 Dibulatkan 476,650.00

m3

m3

Page 32: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 32+29

A.01.13 1 M2 BONGKARAN DINDING TEMBOK BATA MERAHBAHAN :

- -

Jumlah Bahan - UPAH :Pekerja 0.6667 Oh 60,000.00 40,002.00 Mandor 0.0330 Oh 100,000.00 3,300.00 Jumlah Pekerja 43,302.00 Jumlah Bahan + Pekerja 43,302.00 Keuntungan Max. 10 % 4,330.20 Jumlah Total 47,632.20 Dibulatkan 47,630.00

A.01.16 1 M2 PAPAN NAMA PROYEKBAHAN :Kayu Albasiah, Balok 0.0420 m³ 2,000,000.00 84,000.00 Paku 4 - 7 0.2500 kg 16,400.00 4,100.00 Pengecatan Kayu 1.0000 ls 11,747.00 11,747.00 Jumlah Bahan 99,847.00 UPAH :Penulisan 0.1250 Oh 99,847.00 12,480.88 Ongkos Pasang 0.1250 Oh 99,847.00 12,480.88 Jumlah Pekerja 24,961.75 Jumlah Bahan + Pekerja 124,808.75 Keuntungan Max. 10 % 12,480.88 Jumlah Total 137,289.63 Dibulatkan 137,280.00

A.02.01 1 M3 GALIAN TANAH BIASA KEDALAMAN MAX 1 MBAHAN :

- -

Jumlah Bahan - UPAH :Pekerja 0.4000 Oh 60,000.00 24,000.00 Mandor 0.0400 Oh 100,000.00 4,000.00 Jumlah Pekerja 28,000.00 Jumlah Bahan + Pekerja 28,000.00 Keuntungan Max. 10 % 2,800.00 Jumlah Total 30,800.00 Dibulatkan 30,800.00

A.02.02 1 M3 GALIAN TANAH BIASA KEDALAMAN MAX 2 MBAHAN :

- -

Jumlah Bahan - UPAH :Pekerja 0.5260 Oh 60,000.00 31,560.00 Mandor 0.0520 Oh 100,000.00 5,200.00 Jumlah Pekerja 36,760.00 Jumlah Bahan + Pekerja 36,760.00 Keuntungan Max. 10 % 3,676.00 Jumlah Total 40,436.00 Dibulatkan 40,430.00

A.02.03 1 M3 GALIAN TANAH BIASA KEDALAMAN MAX 3 MBAHAN :

- -

Jumlah Bahan - UPAH :Pekerja 0.7350 Oh 60,000.00 44,100.00 Mandor 0.0730 Oh 100,000.00 7,300.00 Jumlah Pekerja 51,400.00 Jumlah Bahan + Pekerja 51,400.00 Keuntungan Max. 10 % 5,140.00 Jumlah Total 56,540.00 Dibulatkan 56,540.00

Page 33: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 33+29

A.02.04 1 M3 GALIAN TANAH BIASA KEDALAMAN MAX 4 MBAHAN :

- -

Jumlah Bahan - UPAH :Pekerja 0.9440 Oh 60,000.00 56,640.00 Mandor 0.0940 Oh 100,000.00 9,400.00 Jumlah Pekerja 66,040.00 Jumlah Bahan + Pekerja 66,040.00 Keuntungan Max. 10 % 6,604.00 Jumlah Total 72,644.00 Dibulatkan 72,640.00

A.02.05 1 M3 GALIAN TANAH BIASA KEDALAMAN MAX 5 MBAHAN :

- -

Jumlah Bahan - UPAH :Pekerja 1.1530 Oh 60,000.00 69,180.00 Mandor 0.1150 Oh 100,000.00 11,500.00 Jumlah Pekerja 80,680.00 Jumlah Bahan + Pekerja 80,680.00 Keuntungan Max. 10 % 8,068.00 Jumlah Total 88,748.00 Dibulatkan 88,740.00

A.02.06 1 M3 GALIAN TANAH KERAS SEDALAM 1 METERBAHAN :

- -

Jumlah Bahan - UPAH :Pekerja 0.6250 Oh 60,000.00 37,500.00 Mandor 0.0620 Oh 100,000.00 6,200.00 Jumlah Pekerja 43,700.00 Jumlah Bahan + Pekerja 43,700.00 Keuntungan Max. 10 % 4,370.00 Jumlah Total 48,070.00 Dibulatkan 48,070.00

A.02.07 1 M3 GALIAN TANAH CADAS SEDALAM 1 METERBAHAN :

- -

Jumlah Bahan - UPAH :Pekerja 1.2500 Oh 60,000.00 75,000.00 Mandor 0.1250 Oh 100,000.00 12,500.00 Jumlah Pekerja 87,500.00 Jumlah Bahan + Pekerja 87,500.00 Keuntungan Max. 10 % 8,750.00 Jumlah Total 96,250.00 Dibulatkan 96,250.00

A.02.08 1 M3 GALIAN TANAH LUMPUR SEDALAM 1 METERBAHAN :

- -

Jumlah Bahan - UPAH :Pekerja 0.8230 Oh 60,000.00 49,380.00 Mandor 0.0830 Oh 100,000.00 8,300.00 Jumlah Pekerja 57,680.00 Jumlah Bahan + Pekerja 57,680.00 Keuntungan Max. 10 % 5,768.00 Jumlah Total 63,448.00 Dibulatkan 63,440.00

Page 34: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 34+29

A.02.09 1 M2 PEKERJAAN STRIPING TANAH SETINGGI 1 METERBAHAN :

- -

Jumlah Bahan - UPAH :Pekerja 0.0500 Oh 60,000.00 3,000.00 Mandor 0.0050 Oh 100,000.00 500.00 Jumlah Pekerja 3,500.00 Jumlah Bahan + Pekerja 3,500.00 Keuntungan Max. 10 % 350.00 Jumlah Total 3,850.00 Dibulatkan 3,850.00

A.02.10 1 M3 PEMBUANGAN TANAH SEJAUH 150 METERBAHAN :

- -

Jumlah Bahan - UPAH :Pekerja 0.5160 Oh 60,000.00 30,960.00 Mandor 0.0500 Oh 100,000.00 5,000.00 Jumlah Pekerja 35,960.00 Jumlah Bahan + Pekerja 35,960.00 Keuntungan Max. 10 % 3,596.00 Jumlah Total 39,556.00 Dibulatkan 39,550.00

A.02.11 1 M3 URUGAN TANAH KEMBALIBAHAN :

- -

Jumlah Bahan - UPAH :Pekerja 0.1920 Oh 60,000.00 11,520.00 Mandor 0.0190 Oh 100,000.00 1,900.00 Jumlah Pekerja 13,420.00 Jumlah Bahan + Pekerja ``````````````````` 13,420.00 Keuntungan Max. 10 % 1,342.00 Jumlah Total 14,762.00 Dibulatkan 14,760.00

A.02.12 1 M3 PEMADATAN TANAHBAHAN :

- -

Jumlah Bahan - UPAH :Pekerja 0.3000 Oh 60,000.00 18,000.00 Mandor 0.0300 Oh 100,000.00 3,000.00 Jumlah Pekerja 21,000.00 Jumlah Bahan + Pekerja 21,000.00 Keuntungan Max. 10 % 2,100.00 Jumlah Total 23,100.00 Dibulatkan 23,100.00

A.02.13 1 M3 URUGAN PASIRBAHAN :Pasir Urug 1.2000 m³ 100,000.00 120,000.00

Jumlah Bahan 120,000.00 UPAH :Pekerja 0.3000 Oh 60,000.00 18,000.00 Mandor 0.0100 Oh 100,000.00 1,000.00 Jumlah Pekerja 19,000.00 Jumlah Bahan + Pekerja 139,000.00 Keuntungan Max. 10 % 13,900.00 Jumlah Total 152,900.00 Dibulatkan 152,900.00

Page 35: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 35+29

A.02.14 1 M3 LAPISAN PUDEL CAMPURAN 1 KP : 3 PS : 7 TLBAHAN :Pasir Urug 0.3300 m³ 100,000.00 33,000.00 Kapur Padam 0.1090 m³ 161,300.00 17,581.70 Tanah Liat 0.7630 m³ 52,700.00 40,210.10 Jumlah Bahan 90,791.80 UPAH :Pekerja 0.8330 Oh 60,000.00 49,980.00 Tukang Batu 0.4160 Oh 75,000.00 31,200.00 Kepala Tukang 0.0400 Oh 95,000.00 3,800.00 Mandor 0.0830 Oh 100,000.00 8,300.00 Jumlah Pekerja 93,280.00 Jumlah Bahan + Pekerja 184,071.80 Keuntungan Max. 10 % 18,407.18 Jumlah Total 202,478.98 Dibulatkan 202,470.00

A.02.15 1 M3 LAPISAN PUDEL CAMPURAN 1 KP : 5 TLBAHAN :Kapur Padam 0.2000 m³ 161,300.00 32,260.00 Tanah Liat 1.0000 m³ 52,700.00 52,700.00 Jumlah Bahan 84,960.00 UPAH :Pekerja 0.8330 Oh 60,000.00 49,980.00 Tukang Batu 0.4160 Oh 75,000.00 31,200.00 Kepala Tukang 0.0410 Oh 95,000.00 3,895.00 Mandor 0.0810 Oh 100,000.00 8,100.00 Jumlah Pekerja 93,175.00 Jumlah Bahan + Pekerja 178,135.00 Keuntungan Max. 10 % 17,813.50 Jumlah Total 195,948.50 Dibulatkan 195,940.00

A.02.16 1 M3 LAPISAN PUDEL CAMPURAN 1 KP : 5 TSBAHAN :Kapur Padam 0.2000 m³ 161,300.00 32,260.00 Pasir Pasang 1.0000 m³ 118,200.00 118,200.00 Jumlah Bahan 150,460.00 UPAH :Pekerja 0.8330 Oh 60,000.00 49,980.00 Tukang Batu 0.4160 Oh 75,000.00 31,200.00 Kepala Tukang 0.0410 Oh 95,000.00 3,895.00 Mandor 0.0810 Oh 100,000.00 8,100.00 Jumlah Pekerja 93,175.00 Jumlah Bahan + Pekerja 243,635.00 Keuntungan Max. 10 % 24,363.50 Jumlah Total 267,998.50 Dibulatkan 267,990.00

A.02.17 1 M3 PEMASANGAN LAPISAN IJUKBAHAN :Injuk 1.2000 m³ 21,800.00 26,160.00

Jumlah Bahan 26,160.00 UPAH :Pekerja 0.1500 Oh 60,000.00 9,000.00 Mandor 0.0150 Oh 100,000.00 1,500.00 Jumlah Pekerja 10,500.00 Jumlah Bahan + Pekerja 36,660.00 Keuntungan Max. 10 % 3,666.00 Jumlah Total 40,326.00 Dibulatkan 40,320.00

A.02.18 1 M3 URUGAN SIRTUBAHAN :Sirtu 1.2000 m³ 148,900.00 178,680.00

Jumlah Bahan 178,680.00 UPAH :Pekerja 0.2500 Oh 60,000.00 15,000.00 Mandor 0.0250 Oh 100,000.00 2,500.00 Jumlah Pekerja 17,500.00 Jumlah Bahan + Pekerja 196,180.00 Keuntungan Max. 10 % 19,618.00 Jumlah Total 215,798.00 Dibulatkan 215,790.00

Page 36: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 36+29

A.02.19 1 M2 PEMBUATAN JALAN SEMENTARA, TEBAL 25 CMBAHAN :Batu Belah 0.2750 m³ 154,500.00 42,487.50 Kerikil 0.0300 m³ 228,200.00 6,846.00 Pasir Urug 0.0500 m³ 100,000.00 5,000.00 Jumlah Bahan 54,333.50 UPAH :Pekerja 1.0000 Oh 60,000.00 60,000.00 Mandor 0.1000 Oh 100,000.00 10,000.00 Jumlah Pekerja 70,000.00 Jumlah Bahan + Pekerja 124,333.50 Keuntungan Max. 10 % 12,433.35 Jumlah Total 136,766.85 Dibulatkan 136,760.00

A.02.20 1 M3 PEKERJAAN GALIAN TANAH SUMURAN MAX KEDALAMAN 10 M'BAHAN :

- Jumlah Bahan - UPAH :Pekerja 1.1500 Oh 60,000.00 69,000.00 Mandor 0.0250 Oh 100,000.00 2,500.00 Jumlah Pekerja 71,500.00 Jumlah Bahan + Pekerja 71,500.00 Keuntungan Max. 10 % 7,150.00 Jumlah Total 78,650.00 Dibulatkan 78,650.00

A.02.22 1 M3 PENIMBUNAN TANAH DIPADATKAN (TANAH DARI LUAR)BAHAN :Tanah Urug (didatangkan) 1.2000 m³ 11,800.00 14,160.00

Jumlah Bahan 14,160.00 UPAH :Pekerja 0.4500 Oh 60,000.00 27,000.00 Mandor 0.0450 Oh 100,000.00 4,500.00 Alat Bantu (sewa Stamper) 0.1250 Oh 98,300.00 12,287.50 Jumlah Pekerja 43,787.50 Jumlah Bahan + Pekerja 57,947.50 Keuntungan Max. 10 % 5,794.75 Jumlah Total 63,742.25 Dibulatkan 63,740.00

A.02.23 1 M2 PASANGAN LEMPENGAN RUMPUT SAMPAI TUMBUH BAHAN :Lempengan Rumput Biasa (Teki) 1.2000 m² 12,500.00 15,000.00 Jumlah Bahan 15,000.00 UPAH :Pekerja Setengah Terampil 0.0400 org 65,000.00 2,600.00 Mandor 0.0100 org 100,000.00 1,000.00 Jumlah Pekerja 3,600.00 Jumlah Bahan + Pekerja 18,600.00 Keuntungan Max. 10 % 1,860.00 Jumlah 20,460.00 Dibulatkan 20,460.00

A.03.02 1 M3 PASANG PONDASI BATU KALI 1 Pc : 2 PsBAHAN :Batu Belah 15/20 1.1000 m³ 154,500.00 169,950.00 Semen Portland 267.0000 Kg 1,800.00 480,600.00 Pasir Pasang 0.4270 m³ 118,200.00 50,471.40 Jumlah Bahan 701,021.40 UPAH :Pekerja 1.5000 Oh 60,000.00 90,000.00 Tukang Batu 0.6000 Oh 75,000.00 45,000.00 Kepala Tukang 0.0600 Oh 95,000.00 5,700.00 Mandor 0.0350 Oh 100,000.00 3,500.00 Jumlah Pekerja 144,200.00 Jumlah Bahan + Pekerja 845,221.40 Keuntungan Max. 10 % 84,522.14 Jumlah Total 929,743.54 Dibulatkan 929,740.00

Page 37: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 37+29

A.03.03 1 M3 PASANG PONDASI BATU KALI 1 Pc : 3 PsBAHAN :Batu Belah 15/20 1.1000 m³ 154,500.00 169,950.00 Semen Portland 202.0000 Kg 1,800.00 363,600.00 Pasir Pasang 0.4850 m³ 118,200.00 57,327.00 Jumlah Bahan 590,877.00 UPAH :Pekerja 1.5000 Oh 60,000.00 90,000.00 Tukang Batu 0.6000 Oh 75,000.00 45,000.00 Kepala Tukang 0.0600 Oh 95,000.00 5,700.00 Mandor 0.0350 Oh 100,000.00 3,500.00 Jumlah Pekerja 144,200.00 Jumlah Bahan + Pekerja 735,077.00 Keuntungan Max. 10 % 73,507.70 Jumlah Total 808,584.70 Dibulatkan 808,580.00

A.03.04 1 M3 PASANG PONDASI BATU KALI 1 Pc : 4 PsBAHAN :Batu Belah 15/20 1.1000 m³ 154,500.00 169,950.00 Semen Portland 163.0000 Kg 1,800.00 293,400.00 Pasir Pasang 0.5200 m³ 118,200.00 61,464.00 Jumlah Bahan 524,814.00 UPAH :Pekerja 1.5000 Oh 60,000.00 90,000.00 Tukang Batu 0.6000 Oh 75,000.00 45,000.00 Kepala Tukang 0.0600 Oh 95,000.00 5,700.00 Mandor 0.0350 Oh 100,000.00 3,500.00 Jumlah Pekerja 144,200.00 Jumlah Bahan + Pekerja 669,014.00 Keuntungan Max. 10 % 66,901.40 Jumlah Total 735,915.40 Dibulatkan 735,910.00

A.03.05 1 M3 PASANG PONDASI BATU KALI 1 Pc : 5 PsBAHAN :Batu Belah 15/20 1.1000 m³ 154,500.00 169,950.00 Semen Portland 136.0000 Kg 1,800.00 244,800.00 Pasir Pasang 0.5440 m³ 118,200.00 64,300.80 Jumlah Bahan 479,050.80 UPAH :Pekerja 1.5000 Oh 60,000.00 90,000.00 Tukang Batu 0.6000 Oh 75,000.00 45,000.00 Kepala Tukang 0.0600 Oh 95,000.00 5,700.00 Mandor 0.0350 Oh 100,000.00 3,500.00 Jumlah Pekerja 144,200.00 Jumlah Bahan + Pekerja 623,250.80 Keuntungan Max. 10 % 62,325.08 Jumlah Total 685,575.88 Dibulatkan 685,570.00

A.03.13 1 M3 PASANG AANSTAMPING BATU KOSONGBAHAN :Batu Belah 15/20 1.2000 m³ 154,500.00 185,400.00 Pasir Urug 0.3000 m³ 100,000.00 30,000.00 Jumlah Bahan 215,400.00 UPAH :Pekerja 0.7800 Oh 60,000.00 46,800.00 Tukang Batu 0.3900 Oh 75,000.00 29,250.00 Kepala Tukang 0.0390 Oh 95,000.00 3,705.00 Mandor 0.0200 Oh 100,000.00 2,000.00 Jumlah Pekerja 81,755.00 Jumlah Bahan + Pekerja 297,155.00 Keuntungan Max. 10 % 29,715.50 Jumlah Total 326,870.50 Dibulatkan 326,870.00

Page 38: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 38+29

A.03.14 1 M3 PASANG PONDASI SUMURAN DIAMETER 100 CMBAHAN :Besi Beton 75.0000 Kg 14,500.00 1,087,500.00 Semen Portland 202.0000 Kg 1,800.00 363,600.00 Pasir Beton 0.3200 m³ 136,400.00 43,648.00 Koral Beton 0.4900 m³ 228,200.00 111,818.00 Kawat Beton 0.8000 Kg 15,500.00 12,400.00 Jumlah Bahan 1,618,966.00 UPAH :Pekerja 3.0000 Oh 60,000.00 180,000.00 Tukang Batu 0.8500 Oh 75,000.00 63,750.00 Kepala Tukang 0.0850 Oh 95,000.00 8,075.00 MAndor 0.1500 Oh 100,000.00 15,000.00 Jumlah Pekerja 266,825.00 Jumlah Bahan + Pekerja 1,885,791.00 Keuntungan Max. 10 % 188,579.10 Jumlah Total 2,074,370.10 Dibulatkan 2,074,370.00

A.03.15 1 M3 PASANG PONDASI SIKLOP 40% BATU KALIBAHAN :Batu Belah 15/20 0.4500 m³ 154,500.00 69,525.00 Semen Portland 280.0000 Kg 1,800.00 504,000.00 Pasir Beton 0.4500 m³ 136,400.00 61,380.00 Koral Beton 0.6700 m³ 228,200.00 152,894.00 Jumlah Bahan 787,799.00 UPAH :Pekerja 2.3800 Oh 60,000.00 142,800.00 Tukang Batu 0.3000 Oh 75,000.00 22,500.00 Kepala Tukang 0.0300 Oh 95,000.00 2,850.00 Mandor 0.0160 Oh 100,000.00 1,600.00 Jumlah Pekerja 169,750.00 Jumlah Bahan + Pekerja 957,549.00 Keuntungan Max. 10 % 95,754.90 Jumlah Total 1,053,303.90 Dibulatkan 1,053,300.00

A.03.16 1 M1 PEMBUATAN TIANG PANCANG (40 X 40) CM, BETON BERTULANGBAHAN :Pasir Urug Darat 0.0190 m³ 100,000.00 1,900.00 Pasir Beton 0.0940 m³ 136,400.00 12,821.60 Koral Beton 0.1500 m³ 228,200.00 34,230.00 Semen Portland 60.5000 Kg 1,800.00 108,900.00 Besi Beton 45.0000 Kg 14,500.00 652,500.00 Kawat Beton 0.9000 Kg 15,500.00 13,950.00 Kayu Kaso 5/7 Lokal Kelas II 0.0320 m³ 3,545,500.00 113,456.00 Paku 0.1200 Kg 16,400.00 1,968.00 Minyak Bekisting 0.0900 Lt 36,600.00 3,294.00 Plamir Tembok 0.2400 Kg 21,800.00 5,232.00 Jumlah Bahan 948,251.60 UPAH :Pekerja 1.0000 Oh 60,000.00 60,000.00 Tukang Batu 0.6700 Oh 75,000.00 50,250.00 Kepala Tukang 0.0670 Oh 95,000.00 6,365.00 Mandor 0.0500 Oh 100,000.00 5,000.00 Jumlah Pekerja 121,615.00 Jumlah Bahan + Pekerja 1,069,866.60 Keuntungan Max. 10 % 106,986.66 Jumlah Total 1,176,853.26 Dibulatkan 1,176,850.00

Page 39: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 39+29

A.03.17 1 M1 PEMBUATAN TIANG PANCANG (35 X 35) CM, BETON BERTULANGBAHAN :Pasir Urug Darat 0.0160 m³ 100,000.00 1,600.00 Pasir Beton 0.0800 m³ 136,400.00 10,912.00 Koral Beton 0.1250 m³ 228,200.00 28,525.00 Semen Portland 49.0000 Kg 1,800.00 88,200.00 Besi Beton 34.0000 Kg 14,500.00 493,000.00 Kawat Beton 0.7000 Kg 15,500.00 10,850.00 Kayu Kaso 5/7 0.0270 m³ 2,000,000.00 54,000.00 Paku 0.1200 Kg 16,400.00 1,968.00 Minyak Bekisting 0.0900 Lt 36,600.00 3,294.00 Plamir Tembok 0.2000 Kg 21,800.00 4,360.00 Jumlah Bahan 696,709.00 UPAH :Pekerja 0.8000 Oh 60,000.00 48,000.00 Tukang Batu 0.5000 Oh 75,000.00 37,500.00 Kepala Tukang 0.0500 Oh 95,000.00 4,750.00 Mandor 0.0400 Oh 100,000.00 4,000.00 Jumlah Pekerja 94,250.00 Jumlah Bahan + Pekerja 790,959.00 Keuntungan Max. 10 % 79,095.90 Jumlah Total 870,054.90 Dibulatkan 870,050.00

A.03.18 1 M3 PASANGAN BATU BRONJONGBAHAN :Batu Kali (Batu Bulat) Bronjol 1.2000 m³ 141,800.00 170,160.00 Kawat Bronjong 3.5000 kg 12,300.00 43,050.00 Jumlah Bahan 213,210.00 UPAH :Pekerja 1.5000 Oh 60,000.00 90,000.00 Pekerja terampil 0.2000 Oh 70,000.00 14,000.00 Mandor 0.0200 Oh 100,000.00 2,000.00 Jumlah Pekerja 106,000.00 Jumlah Bahan + Pekerja 319,210.00 Keuntungan Max. 10 % 31,921.00 Jumlah Total 351,131.00 Dibulatkan 351,130.00

A.03.20 1 M3 PASANGAN BATU TEMPEL+ SIARANBAHAN :Batu Tempel 1.1000 m2 ### 212,700.00 233,970.00 Semen Portland 6.0000 Kg 1,800.00 10,800.00 Pasir Pasang 0.0310 m³ 118,200.00 3,664.20 Jumlah Bahan 248,434.20 UPAH :Pekerja 0.1875 Oh 60,000.00 11,250.00 Tukang Batu 0.2250 Oh 75,000.00 16,875.00 Kepala Tukang Batu 0.0375 Oh 95,000.00 3,562.50 Mandor 0.0160 Oh 100,000.00 1,600.00 Jumlah Pekerja 33,287.50 Jumlah Bahan + Pekerja 281,721.70 Keuntungan Max. 10 % 28,172.17 Jumlah Total 309,893.87 Dibulatkan 309,890.00

A.03.21 1 M3 PASANGAN BATU HITAMBAHAN :Batu Hitam 1.0500 m2 212,700.00 223,335.00 Semen Portland 11.7500 Kg 1,800.00 21,150.00 Pasir Pasang 0.0350 m³ 118,200.00 4,137.00 Jumlah Bahan 248,622.00 UPAH :Pekerja 0.6200 Oh 60,000.00 37,200.00 Tukang Batu 0.3500 Oh 75,000.00 26,250.00 Kepala Tukang Batu 0.0350 Oh 95,000.00 3,325.00 Mandor 0.0160 Oh 100,000.00 1,600.00 Jumlah Pekerja 68,375.00 Jumlah Bahan + Pekerja 316,997.00 Keuntungan Max. 10 % 31,699.70 Jumlah Total 348,696.70 Dibulatkan 348,690.00

Page 40: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 40+29

A.04.05 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc : 5 PsBAHAN :Bata Merah 5 x 11 x 22 cm 140.0000 bh 400.00 56,000.00 Semen Portland 22.2000 Kg 1,800.00 39,960.00 Pasir Pasang 0.1020 m³ 118,200.00 12,056.40 Jumlah Bahan 108,016.40 UPAH :Pekerja 0.6500 Oh 60,000.00 39,000.00 Tukang Batu 0.2000 Oh 75,000.00 15,000.00 Kepala Tukang 0.0200 Oh 95,000.00 1,900.00 Mandor 0.0150 Oh 100,000.00 1,500.00 Jumlah Pekerja 57,400.00 Jumlah Bahan + Pekerja 165,416.40 Keuntungan Max. 10 % 16,541.64 Jumlah Total 181,958.04 Dibulatkan 181,950.00

A.04.09 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 2 PsBAHAN :Bata Merah 5 x 11 x 22 cm 70.0000 bh 400.00 28,000.00 Semen Portland 18.9500 Kg 1,800.00 34,110.00 Pasir Pasang 0.0380 m³ 118,200.00 4,491.60 Jumlah Bahan 66,601.60 UPAH :Pekerja 0.3200 Oh 60,000.00 19,200.00 Tukang Batu 0.1000 Oh 75,000.00 7,500.00 Kepala Tukang 0.0100 Oh 95,000.00 950.00 Mandor 0.0050 Oh 100,000.00 500.00 Jumlah Pekerja 28,150.00 Jumlah Bahan + Pekerja 94,751.60 Keuntungan Max. 10 % 9,475.16 Jumlah Total 104,226.76 Dibulatkan 104,220.00

A.04.10 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 3 PsBAHAN :Bata Merah 5 x 11 x 22 cm 70.0000 bh 400.00 28,000.00 Semen Portland 14.3700 Kg 1,800.00 25,866.00 Pasir Pasang 0.0400 m³ 118,200.00 4,728.00 Jumlah Bahan 58,594.00 UPAH :Pekerja 0.3200 Oh 60,000.00 19,200.00 Tukang Batu 0.1000 Oh 75,000.00 7,500.00 Kepala Tukang 0.0100 Oh 95,000.00 950.00 Mandor 0.0050 Oh 100,000.00 500.00 Jumlah Pekerja 28,150.00 Jumlah Bahan + Pekerja 86,744.00 Keuntungan Max. 10 % 8,674.40 Jumlah Total 95,418.40 Dibulatkan 95,410.00

A.04.11 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 4 PsBAHAN :Bata Merah 5 x 11 x 22 cm 70.0000 bh 400.00 28,000.00 Semen Portland 11.5000 Kg 1,800.00 20,700.00 Pasir Pasang 0.0430 m³ 118,200.00 5,082.60 Jumlah Bahan 53,782.60 UPAH :Pekerja 0.3200 Oh 60,000.00 19,200.00 Tukang Batu 0.1000 Oh 75,000.00 7,500.00 Kepala Tukang 0.0100 Oh 95,000.00 950.00 Mandor 0.0050 Oh 100,000.00 500.00 Jumlah Pekerja 28,150.00 Jumlah Bahan + Pekerja 81,932.60 Keuntungan Max. 10 % 8,193.26 Jumlah Total 90,125.86 Dibulatkan 90,120.00

Page 41: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 41+29

A.04.12 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 5 PsBAHAN :Bata Merah 5 x 11 x 22 cm 70.0000 bh 400.00 28,000.00 Semen Portland 9.6800 Kg 1,800.00 17,424.00 Pasir Pasang 0.0450 m³ 118,200.00 5,319.00 Jumlah Bahan 50,743.00 UPAH :Pekerja 0.3200 Oh 60,000.00 19,200.00 Tukang Batu 0.1000 Oh 70,000.00 7,000.00 Kepala Tukang 0.0100 Oh 95,000.00 950.00 Mandor 0.0050 Oh 100,000.00 500.00 Jumlah Pekerja 27,650.00 Jumlah Bahan + Pekerja 78,393.00 Keuntungan Max. 10 % 7,839.30 Jumlah Total 86,232.30 Dibulatkan 86,230.00

A.04.18 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB.20)BAHAN :Hollow Block (HB.20) 12.5000 bh 3,200.00 40,000.00 Semen Portland 13.5000 Kg 1,800.00 24,300.00 Pasir Pasang 0.0480 m³ 118,200.00 5,673.60 Besi Beton Polos 1.9500 Kg 14,500.00 28,275.00 Jumlah Bahan 98,248.60 UPAH :Pekerja 0.3500 Oh 60,000.00 21,000.00 Tukang Batu 0.1500 Oh 75,000.00 11,250.00 Kepala Tukang 0.0150 Oh 95,000.00 1,425.00 Mandor 0.0075 Oh 100,000.00 750.00 Jumlah Pekerja 34,425.00 Jumlah Bahan + Pekerja 132,673.60 Keuntungan Max. 10 % 13,267.36 Jumlah Total 145,940.96 Dibulatkan 145,940.00

A.04.19 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB.15)BAHAN :Hollow Block (HB.15) 12.5000 bh 2,900.00 36,250.00 Semen Portland 10.4500 Kg 1,800.00 18,810.00 Pasir Pasang 0.0380 m³ 118,200.00 4,491.60 Besi Beton Polos 1.9500 Kg 14,500.00 28,275.00 Jumlah Bahan 87,826.60 UPAH :Pekerja 0.3200 Oh 60,000.00 19,200.00 Tukang Batu 0.1200 Oh 75,000.00 9,000.00 Kepala Tukang 0.0120 Oh 95,000.00 1,140.00 Mandor 0.0060 Oh 100,000.00 600.00 Jumlah Pekerja 29,940.00 Jumlah Bahan + Pekerja 117,766.60 Keuntungan Max. 10 % 11,776.66 Jumlah Total 129,543.26 Dibulatkan 129,540.00

A.04.20 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB.10)BAHAN :Hollow Block (HB.10) 12.5000 bh 2,400.00 30,000.00 Semen Portland 7.5000 Kg 1,800.00 13,500.00 Pasir Pasang 0.0270 m³ 118,200.00 3,191.40 Besi Beton Polos 1.9500 Kg 14,500.00 28,275.00 Jumlah Bahan 74,966.40 UPAH :Pekerja 0.3200 Oh 60,000.00 19,200.00 Tukang Batu 0.1000 Oh 75,000.00 7,500.00 Kepala Tukang 0.0100 Oh 95,000.00 950.00 Mandor 0.0050 Oh 100,000.00 500.00 Jumlah Pekerja 28,150.00 Jumlah Bahan + Pekerja 103,116.40 Keuntungan Max. 10 % 10,311.64 Jumlah Total 113,428.04 Dibulatkan 113,420.00

Page 42: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 42+29

A.04.25 1 M2 PASANGAN DINDING DINDING ROSTER/TERAWANG (12X11X24) KERAMIKBAHAN :Roster/Terawang 36.0000 bh 40,000.00 1,440,000.00 Semen Portland 0.1280 Kg 1,800.00 230.40 Pasir Pasang 0.0350 m³ 118,200.00 4,137.00 Jumlah Bahan 1,444,367.40 UPAH :Pekerja 0.3000 Oh 60,000.00 18,000.00 Tukang Batu 0.1000 Oh 75,000.00 7,500.00 Kepala Tukang 0.0100 Oh 95,000.00 950.00 Mandor 0.0150 Oh 100,000.00 1,500.00 Jumlah Pekerja 27,950.00 Jumlah Bahan + Pekerja 1,472,317.40 Keuntungan Max. 10 % 147,231.74 Jumlah Total 1,619,549.14 Dibulatkan 1,619,540.00

A.04.27 1 M2 PASANGAN DINDING ANYAMAN BAMBU, RANGKA KAYUBAHAN :Bilik Bambu 1.5000 m2 8,700.00 13,050.00 Kayu 5/7 0.0140 m³ 2,000,000.00 28,000.00 Paku Biasa 2"-5" 0.0120 Kg 16,400.00 196.80 List Kayu 2/4 0.0030 m³ 4,400.00 13.20 Jumlah Bahan 41,260.00 UPAH :Pekerja 0.1000 Oh 60,000.00 6,000.00 Tukang Batu 0.0500 Oh 75,000.00 3,750.00 Kepala Tukang 0.0050 Oh 95,000.00 475.00 Mandor 0.0020 Oh 100,000.00 200.00 Jumlah Pekerja 10,425.00 Jumlah Bahan + Pekerja 51,685.00 Keuntungan Max. 10 % 5,168.50 Jumlah Total 56,853.50 Dibulatkan 56,850.00

A.05.02 1 M2 PASANGAN PLESTERAN 1 Pc : 2 Ps, TEBAL 15 MM + ACIANBAHAN :Semen Portland 8.5200 Kg 1,800.00 15,336.00 Pasir Pasang 0.0170 m³ 118,200.00 2,009.40 Jumlah Bahan 17,345.40 UPAH :Pekerja 0.2000 Oh 60,000.00 12,000.00 Tukang Batu 0.1500 Oh 75,000.00 11,250.00 Kepala Tukang 0.0150 Oh 95,000.00 1,425.00 Mandor 0.0100 Oh 100,000.00 1,000.00 Jumlah Pekerja 25,675.00 Jumlah Bahan + Pekerja 43,020.40 Keuntungan Max. 10 % 4,302.04 Jumlah Total 47,322.44 Dibulatkan 47,320.00

A.05.03 1 M2 PASANGAN PLESTERAN 1 Pc : 3 Ps, TEBAL 15 MM + ACIANBAHAN :Semen Portland 6.4800 Kg 1,800.00 11,664.00 Pasir Pasang 0.0190 m³ 118,200.00 2,245.80 Jumlah Bahan 13,909.80 UPAH :Pekerja 0.2000 Oh 60,000.00 12,000.00 Tukang Batu 0.1500 Oh 75,000.00 11,250.00 Kepala Tukang 0.0150 Oh 95,000.00 1,425.00 Mandor 0.0100 Oh 100,000.00 1,000.00 Jumlah Pekerja 25,675.00 Jumlah Bahan + Pekerja 39,584.80 Keuntungan Max. 10 % 3,958.48 Jumlah Total 43,543.28 Dibulatkan 43,540.00

Page 43: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 43+29

A.05.04 1 M2 PASANGAN PLESTERAN 1 Pc : 4 Ps, TEBAL 15 MM + ACIANBAHAN :Semen Portland 5.2000 Kg 1,800.00 9,360.00 Pasir Pasang 0.0200 m³ 118,200.00 2,364.00 Jumlah Bahan 11,724.00 UPAH :Pekerja 0.2000 Oh 60,000.00 12,000.00 Tukang Batu 0.1500 Oh 75,000.00 11,250.00 Kepala Tukang 0.0150 Oh 95,000.00 1,425.00 Mandor 0.0100 Oh 100,000.00 1,000.00 Jumlah Pekerja 25,675.00 Jumlah Bahan + Pekerja 37,399.00 Keuntungan Max. 10 % 3,739.90 Jumlah Total 41,138.90 Dibulatkan 41,130.00

A.05.05 1 M2 PASANGAN PLESTERAN 1 Pc : 5 Ps, TEBAL 15 MM + ACIANBAHAN :Semen Portland 4.3200 Kg 1,800.00 7,776.00 Pasir Pasang 0.0220 m³ 118,200.00 2,600.40 Jumlah Bahan 10,376.40 UPAH :Pekerja 0.2000 Oh 60,000.00 12,000.00 Tukang Batu 0.1500 Oh 75,000.00 11,250.00 Kepala Tukang 0.0150 Oh 75,000.00 1,125.00 Mandor 0.0100 Oh 100,000.00 1,000.00 Jumlah Pekerja 25,375.00 Jumlah Bahan + Pekerja 35,751.40 Keuntungan Max. 10 % 3,575.14 Jumlah Total 39,326.54 Dibulatkan 39,320.00

A.05.13 1 M2 PASANGAN PLESTERAN 1 Pc : 2 Ps, TEBAL 20 MM + ACIANBAHAN :Semen Portland 14.2800 Kg 1,800.00 25,704.00 Pasir Pasang 0.0230 m³ 118,200.00 2,718.60 Jumlah Bahan 28,422.60 UPAH :Pekerja 0.2500 Oh 60,000.00 15,000.00 Tukang Batu 0.2000 Oh 75,000.00 15,000.00 Kepala Tukang 0.0200 Oh 95,000.00 1,900.00 Mandor 0.0125 Oh 100,000.00 1,250.00 Jumlah Pekerja 33,150.00 Jumlah Bahan + Pekerja 61,572.60 Keuntungan Max. 10 % 6,157.26 Jumlah Total 67,729.86 Dibulatkan 67,720.00

A.05.14 1 M2 PASANGAN PLESTERAN 1 Pc : 3 Ps, TEBAL 20 MM + ACIANBAHAN :Semen Portland 10.8000 Kg 1,800.00 19,440.00 Pasir Pasang 0.0260 m³ 118,200.00 3,073.20 Jumlah Bahan 22,513.20 UPAH :Pekerja 0.2500 Oh 60,000.00 15,000.00 Tukang Batu 0.2000 Oh 75,000.00 15,000.00 Kepala Tukang 0.0200 Oh 95,000.00 1,900.00 Mandor 0.0125 Oh 100,000.00 1,250.00 Jumlah Pekerja 33,150.00 Jumlah Bahan + Pekerja 55,663.20 Keuntungan Max. 10 % 5,566.32 Jumlah Total 61,229.52 Dibulatkan 61,220.00

Page 44: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 44+29

A.05.15 1 M2 PASANGAN PLESTERAN 1 Pc : 4 Ps, TEBAL 20 MM + ACIANBAHAN :Semen Portland 8.6800 Kg 1,800.00 15,624.00 Pasir Pasang 0.0280 m³ 118,200.00 3,309.60 Jumlah Bahan 18,933.60 UPAH :Pekerja 0.2500 Oh 60,000.00 15,000.00 Tukang Batu 0.2000 Oh 75,000.00 15,000.00 Kepala Tukang 0.0200 Oh 95,000.00 1,900.00 Mandor 0.0125 Oh 100,000.00 1,250.00 Jumlah Pekerja 33,150.00 Jumlah Bahan + Pekerja 52,083.60 Keuntungan Max. 10 % 5,208.36 Jumlah Total 57,291.96 Dibulatkan 57,290.00

A.05.16 1 M2 PASANGAN PLESTERAN 1 Pc : 5 Ps, TEBAL 20 MM + ACIANBAHAN :Semen Portland 7.2900 Kg 1,800.00 13,122.00 Pasir Pasang 0.0280 m³ 118,200.00 3,309.60 Jumlah Bahan 16,431.60 UPAH :Pekerja 0.2500 Oh 60,000.00 15,000.00 Tukang Batu 0.2000 Oh 75,000.00 15,000.00 Kepala Tukang 0.0200 Oh 95,000.00 1,900.00 Mandor 0.0125 Oh 100,000.00 1,250.00 Jumlah Pekerja 33,150.00 Jumlah Bahan + Pekerja 49,581.60 Keuntungan Max. 10 % 4,958.16 Jumlah Total 54,539.76 Dibulatkan 54,530.00

A.05.19 1 M2 PASANGAN PLESTERAN 1 Pc : 2 Ps, TEBAL 25 MM + ACIANBAHAN :Semen Portland 15.5000 Kg 1,800.00 27,900.00 Pasir Pasang 0.0130 m³ 118,200.00 1,536.60 Jumlah Bahan 29,436.60 UPAH :Pekerja 0.3000 Oh 60,000.00 18,000.00 Tukang Batu 0.2000 Oh 75,000.00 15,000.00 Kepala Tukang 0.0200 Oh 95,000.00 1,900.00 Mandor 0.0130 Oh 100,000.00 1,300.00 Jumlah Pekerja 36,200.00 Jumlah Bahan + Pekerja 65,636.60 Keuntungan Max. 10 % 6,563.66 Jumlah Total 72,200.26 Dibulatkan 72,200.00

A.05.20 1 M2 PASANGAN PLESTERAN 1 Pc : 3 Ps, TEBAL 25 MM + ACIANBAHAN :Semen Portland 11.7500 Kg 1,800.00 21,150.00 Pasir Pasang 0.0350 m³ 118,200.00 4,137.00 Jumlah Bahan 25,287.00 UPAH :Pekerja 0.3000 Oh 60,000.00 18,000.00 Tukang Batu 0.2000 Oh 75,000.00 15,000.00 Kepala Tukang 0.0200 Oh 95,000.00 1,900.00 Mandor 0.0130 Oh 100,000.00 1,300.00 Jumlah Pekerja 36,200.00 Jumlah Bahan + Pekerja 61,487.00 Keuntungan Max. 10 % 6,148.70 Jumlah Total 67,635.70 Dibulatkan 67,630.00

A.05.21 1 M2 PASANGAN PLESTERAN 1 Pc : 4 Ps, TEBAL 25 MM + ACIANBAHAN :Semen Portland 9.4800 Kg 1,800.00 17,064.00 Pasir Pasang 0.0380 m³ 118,200.00 4,491.60 Jumlah Bahan 21,555.60 UPAH :Pekerja 0.3000 Oh 60,000.00 18,000.00 Tukang Batu 0.2000 Oh 75,000.00 15,000.00 Kepala Tukang 0.0200 Oh 95,000.00 1,900.00 Mandor 0.0130 Oh 100,000.00 1,300.00 Jumlah Pekerja 36,200.00 Jumlah Bahan + Pekerja 57,755.60 Keuntungan Max. 10 % 5,775.56 Jumlah Total 63,531.16 Dibulatkan 63,530.00

A.05.22 1 M2 PASANGAN PLESTERAN 1 Pc : 5 Ps, TEBAL 25 MM + ACIAN

Page 45: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 45+29

BAHAN :Semen Portland 7.9400 Kg 1,800.00 14,292.00 Pasir Pasang 0.0390 m³ 118,200.00 4,609.80 Jumlah Bahan 18,901.80 UPAH :Pekerja 0.3000 Oh 60,000.00 18,000.00 Tukang Batu 0.2000 Oh 75,000.00 15,000.00 Kepala Tukang 0.0200 Oh 95,000.00 1,900.00 Mandor 0.0130 Oh 100,000.00 1,300.00 Jumlah Pekerja 36,200.00 Jumlah Bahan + Pekerja 55,101.80 Keuntungan Max. 10 % 5,510.18 Jumlah Total 60,611.98 Dibulatkan 60,610.00

A.05.23 1 M2 PASANGAN PLESTERAN 1 Pc : 2 Ps, TEBAL 30 MM + ACIANBAHAN :Semen Portland 18.6500 Kg 1,800.00 33,570.00 Pasir Pasang 0.0350 m³ 118,200.00 4,137.00 Jumlah Bahan 37,707.00 UPAH :Pekerja 0.3200 Oh 60,000.00 19,200.00 Tukang Batu 0.2500 Oh 75,000.00 18,750.00 Kepala Tukang 0.0250 Oh 95,000.00 2,375.00 Mandor 0.0150 Oh 100,000.00 1,500.00 Jumlah Pekerja 41,825.00 Jumlah Bahan + Pekerja 79,532.00 Keuntungan Max. 10 % 7,953.20 Jumlah Total 87,485.20 Dibulatkan 87,480.00

A.05.24 1 M2 PASANGAN PLESTERAN 1 Pc : 3 Ps, TEBAL 30 MM + ACIANBAHAN :Semen Portland 14.1500 Kg 1,800.00 25,470.00 Pasir Pasang 0.0390 m³ 118,200.00 4,609.80 Jumlah Bahan 30,079.80 UPAH :Pekerja 0.3200 Oh 60,000.00 19,200.00 Tukang Batu 0.2500 Oh 75,000.00 18,750.00 Kepala Tukang 0.0250 Oh 95,000.00 2,375.00 Mandor 0.0150 Oh 100,000.00 1,500.00 Jumlah Pekerja 41,825.00 Jumlah Bahan + Pekerja 71,904.80 Keuntungan Max. 10 % 7,190.48 Jumlah Total 79,095.28 Dibulatkan 79,090.00

A.05.25 1 M2 PASANGAN PLESTERAN 1 Pc : 4 Ps, TEBAL 30 MM + ACIANBAHAN :Semen Portland 11.3800 Kg 1,800.00 20,484.00 Pasir Pasang 0.0420 m³ 118,200.00 4,964.40 Jumlah Bahan 25,448.40 UPAH :Pekerja 0.3200 Oh 60,000.00 19,200.00 Tukang Batu 0.2500 Oh 75,000.00 18,750.00 Kepala Tukang 0.0250 Oh 95,000.00 2,375.00 Mandor 0.0150 Oh 100,000.00 1,500.00 Jumlah Pekerja 41,825.00 Jumlah Bahan + Pekerja 67,273.40 Keuntungan Max. 10 % 6,727.34 Jumlah Total 74,000.74 Dibulatkan 74,000.00

A.05.26 1 M2 PASANGAN PLESTERAN 1 Pc : 5 Ps, TEBAL 30 MM + ACIANBAHAN :Semen Portland 8.1900 Kg 1,800.00 14,742.00 Pasir Pasang 0.0450 m³ 118,200.00 5,319.00 Jumlah Bahan 20,061.00 UPAH :Pekerja 0.3200 Oh 60,000.00 19,200.00 Tukang Batu 0.2500 Oh 75,000.00 18,750.00 Kepala Tukang 0.0250 Oh 95,000.00 2,375.00 Mandor 0.0150 Oh 100,000.00 1,500.00 Jumlah Pekerja 41,825.00 Jumlah Bahan + Pekerja 61,886.00 Keuntungan Max. 10 % 6,188.60 Jumlah Total 68,074.60 Dibulatkan 68,070.00

A.05.31 1 M2 PASANGAN PLESTERAN SKONING 1 Pc : 2 Ps, TEBAL 15 MMBAHAN :

Page 46: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 46+29

Semen Portland 0.5000 Kg 1,800.00 900.00 Pasir Pasang 0.0020 m³ 118,200.00 236.40 Jumlah Bahan 1,136.40 UPAH :Pekerja 0.0570 Oh 60,000.00 3,420.00 Tukang Batu 0.0380 Oh 75,000.00 2,850.00 Kepala Tukang 0.0380 Oh 95,000.00 3,610.00 Mandor 0.0190 Oh 100,000.00 1,900.00 Jumlah Pekerja 11,780.00 Jumlah Bahan + Pekerja 12,916.40 Keuntungan Max. 10 % 1,291.64 Jumlah Total 14,208.04 Dibulatkan 14,200.00

A.05.34 1 M2 PASANGAN PLESTERAN CIPRAT, 1 Pc : 2 PsBAHAN :Semen Portland 4.3200 Kg 1,800.00 7,776.00 Pasir Pasang 0.0160 kg 118,200.00 1,891.20 Jumlah Bahan 9,667.20 UPAH :Pekerja 0.2500 Oh 60,000.00 15,000.00 Tukang Batu 0.1000 Oh 75,000.00 7,500.00 Kepala Tukang 0.0100 Oh 95,000.00 950.00 Mandor 0.0050 Oh 100,000.00 500.00 Jumlah Pekerja 23,950.00 Jumlah Bahan + Pekerja 33,617.20 Keuntungan Max. 10 % 3,361.72 Jumlah Total 36,978.92 Dibulatkan 36,970.00

A.05.35 1 M2 PASANGAN PLESTERAN SIAR ADUKAN 1 Pc : 2 PsBAHAN :Semen Portland 4.3200 Kg 1,800.00 7,776.00 Pasir Pasang 0.0160 kg 118,200.00 1,891.20 Jumlah Bahan 9,667.20 UPAH :Pekerja 0.1500 Oh 60,000.00 9,000.00 Tukang Batu 0.0700 Oh 75,000.00 5,250.00 Kepala Tukang 0.0070 Oh 95,000.00 665.00 Mandor 0.0040 Oh 100,000.00 400.00 Jumlah Pekerja 15,315.00 Jumlah Bahan + Pekerja 24,982.20 Keuntungan Max. 10 % 2,498.22 Jumlah Total 27,480.42 Dibulatkan 27,480.00

A.05.36 1 M2 ACIAN PCBAHAN :P.C (50 kg) 0.0800 zak 90,900.00 7,272.00 Jumlah Bahan 7,272.00 UPAH :Pekerja setengah trampil 0.1430 org 65,000.00 9,295.00 Tk. batu setengah trampil 0.1070 org 75,000.00 8,025.00 Kep. Tukang batu 0.0105 org 95,000.00 997.50 Mandor 0.0053 org 100,000.00 525.00 Jumlah Pekerja 18,842.50 Jumlah Bahan + Pekerja 26,114.50 Keuntungan Max. 10 % 2,611.45 Jumlah 28,725.95 Dibulatkan 28,720.00

A.06.01 1 M2 PASANGAN KUSEN PINTU DAN JENDELA KAYU JATIBAHAN :Kayu Jati, Balok 1.1000 m³ 12,409,100.00 13,650,010.00 Jumlah Bahan 13,650,010.00 UPAH :Pekerja 6.0000 Oh 60,000.00 360,000.00 Tukang Kayu 15.0000 Oh 75,000.00 1,125,000.00 Kepala Tukang 3.0000 Oh 95,000.00 285,000.00 Mandor 0.5000 Oh 100,000.00 50,000.00 Jumlah Pekerja 1,820,000.00 Jumlah Bahan + Pekerja 15,470,010.00 Keuntungan Max. 10 % 1,547,001.00 Jumlah Total 17,017,011.00 Dibulatkan 17,017,010.00

Page 47: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 47+29

A.06.02 1 M3 PASANGAN KUSEN PINTU DAN JENDELA KAYU KAMPER BANJARBAHAN :Kayu Kamper, Balok 1.1000 m³ 8,909,100.00 9,800,010.00 Jumlah Bahan 9,800,010.00 UPAH :Pekerja 6.0000 Oh 60,000.00 360,000.00 Tukang Kayu 15.0000 Oh 75,000.00 1,125,000.00 Kepala Tukang 3.0000 Oh 95,000.00 285,000.00 Mandor 0.5000 Oh 100,000.00 50,000.00 Jumlah Pekerja 1,820,000.00 Jumlah Bahan + Pekerja 11,620,010.00 Keuntungan Max. 10 % 1,162,001.00 Jumlah Total 12,782,011.00 Dibulatkan 12,782,010.00

A.06.03 1 M3 PASANGAN KUSEN PINTU DAN JENDELA KAYU KAYU LOKAL KLS IIBAHAN :Kayu KAYU LOKAL KLS II , Balok 1.1000 m³ 3,545,500.00 3,900,050.00 Jumlah Bahan 3,900,050.00 UPAH :Pekerja 6.0000 Oh 60,000.00 360,000.00 Tukang Kayu 15.0000 Oh 75,000.00 1,125,000.00 Kepala Tukang 3.0000 Oh 95,000.00 285,000.00 Mandor 0.5000 Oh 100,000.00 50,000.00 Jumlah Pekerja 1,820,000.00 Jumlah Bahan + Pekerja 5,720,050.00 Keuntungan Max. 10 % 572,005.00 Jumlah Total 6,292,055.00 Dibulatkan 6,292,050.00

A.06.04 1 M2 PASANGAN PINTU KLAMP KAYU KAYU LOKAL KLS IIBAHAN :Kayu KAYU LOKAL KLS II, Papan 0.0360 m³ 4,018,200.00 144,655.20 Paku Biasa 2"-5" 0.0500 Kg 16,400.00 820.00 Jumlah Bahan 145,475.20 UPAH :Pekerja 0.3500 Oh 60,000.00 21,000.00 Tukang Kayu 1.0500 Oh 75,000.00 78,750.00 Kepala Tukang 0.1050 Oh 95,000.00 9,975.00 Mandor 0.0180 Oh 100,000.00 1,800.00 Jumlah Pekerja 111,525.00 Jumlah Bahan + Pekerja 257,000.20 Keuntungan Max. 10 % 25,700.02 Jumlah Total 282,700.22 Dibulatkan 282,700.00

A.06.05 1 M2 PASANGAN PINTU PANEL KAYU JATIBAHAN :Kayu Jati, Papan 0.0400 m³ 14,227,300.00 569,092.00 Jumlah Bahan 569,092.00 UPAH :Pekerja 1.0000 Oh 60,000.00 60,000.00 Tukang Kayu 2.5000 Oh 75,000.00 187,500.00 Kepala Tukang 0.2500 Oh 95,000.00 23,750.00 Mandor 0.0500 Oh 100,000.00 5,000.00 Jumlah Pekerja 276,250.00 Jumlah Bahan + Pekerja 845,342.00 Keuntungan Max. 10 % 84,534.20 Jumlah Total 929,876.20 Dibulatkan 929,870.00

A.06.06 1 M2 PASANGAN PINTU PANEL KAYU KAMPER BANJARBAHAN :Kayu Kamper , Papan 0.0400 m³ 10,000,000.00 400,000.00 Jumlah Bahan 400,000.00 UPAH :Pekerja 1.0000 Oh 60,000.00 60,000.00 Tukang Kayu 2.5000 Oh 75,000.00 187,500.00 Kepala Tukang 0.2500 Oh 95,000.00 23,750.00 Mandor 0.0500 Oh 100,000.00 5,000.00 Jumlah Pekerja 276,250.00 Jumlah Bahan + Pekerja 676,250.00 Keuntungan Max. 10 % 67,625.00 Jumlah Total 743,875.00 Dibulatkan 743,870.00

Page 48: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 48+29

A.06.07 1 M2 PASANGAN PINTU PANEL KAYU LOKAL KLS IIBAHAN :Kayu Lokal Kls II , Papan 0.0400 m³ 4,018,200.00 160,728.00 Jumlah Bahan 160,728.00 UPAH :Pekerja 1.0000 Oh 60,000.00 60,000.00 Tukang Kayu 2.5000 Oh 75,000.00 187,500.00 Kepala Tukang 0.2500 Oh 95,000.00 23,750.00 Mandor 0.0500 Oh 100,000.00 5,000.00 Jumlah Pekerja 276,250.00 Jumlah Bahan + Pekerja 436,978.00 Keuntungan Max. 10 % 43,697.80 Jumlah Total 480,675.80 Dibulatkan 480,670.00

A.06.08 1 M2 PASANGAN PINTU DAN JENDELA KACA KAYU JATIBAHAN :Kayu Jati , Papan 0.0350 m³ 14,227,300.00 497,955.50 Jumlah Bahan 497,955.50 UPAH :Pekerja 0.8000 Oh 60,000.00 48,000.00 Tukang Kayu 2.0000 Oh 75,000.00 150,000.00 Kepala Tukang 0.2000 Oh 95,000.00 19,000.00 Mandor 0.0400 Oh 100,000.00 4,000.00 Jumlah Pekerja 221,000.00 Jumlah Bahan + Pekerja 718,955.50 Keuntungan Max. 10 % 71,895.55 Jumlah Total 790,851.05 Dibulatkan 790,850.00

A.06.09 1 M2 PASANGAN PINTU DAN JENDELA KACA KAYU KAMPER BANJARBAHAN :Kayu Kamper , Papan 0.0350 m³ 10,000,000.00 350,000.00 Jumlah Bahan 350,000.00 UPAH :Pekerja 0.8000 Oh 60,000.00 48,000.00 Tukang Kayu 2.0000 Oh 75,000.00 150,000.00 Kepala Tukang 0.2000 Oh 95,000.00 19,000.00 Mandor 0.0400 Oh 100,000.00 4,000.00 Jumlah Pekerja 221,000.00 Jumlah Bahan + Pekerja 571,000.00 Keuntungan Max. 10 % 57,100.00 Jumlah Total 628,100.00 Dibulatkan 628,100.00

A.06.10 1 M2 PASANGAN PINTU DAN JENDELA KACA KAYU KAYU LOKAL KLS IIBAHAN :Kayu KAYU LOKAL KLS II , Papan 0.0350 m³ 4,018,200.00 140,637.00 Jumlah Bahan 140,637.00 UPAH :Pekerja 0.8000 Oh 60,000.00 48,000.00 Tukang Kayu 2.0000 Oh 75,000.00 150,000.00 Kepala Tukang 0.2000 Oh 95,000.00 19,000.00 Mandor 0.0400 Oh 100,000.00 4,000.00 Jumlah Pekerja 221,000.00 Jumlah Bahan + Pekerja 361,637.00 Keuntungan Max. 10 % 36,163.70 Jumlah Total 397,800.70 Dibulatkan 397,800.00

A.06.11 1 M2 PASANGAN PINTU DAN JENDELA JALUSI KAYU JATIBAHAN :Kayu Jati , Papan 0.0640 m³ 14,227,300.00 910,547.20 Jumlah Bahan 910,547.20 UPAH :Pekerja 1.0000 Oh 60,000.00 60,000.00 Tukang Kayu 3.0000 Oh 75,000.00 225,000.00 Kepala Tukang 0.3000 Oh 95,000.00 28,500.00 Mandor 0.1500 Oh 100,000.00 15,000.00 Jumlah Pekerja 328,500.00 Jumlah Bahan + Pekerja 1,239,047.20 Keuntungan Max. 10 % 123,904.72 Jumlah Total 1,362,951.92 Dibulatkan 1,362,950.00

Page 49: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 49+29

A.06.12 1 M2 PASANGAN PINTU DAN JENDELA JALUSI KAYU KAMPER BANJARBAHAN :Kayu Kamper , Papan 0.0640 m³ 10,000,000.00 640,000.00 Jumlah Bahan 640,000.00 UPAH :Pekerja 1.0000 Oh 60,000.00 60,000.00 Tukang Kayu 3.0000 Oh 75,000.00 225,000.00 Kepala Tukang 0.3000 Oh 95,000.00 28,500.00 Mandor 0.1500 Oh 100,000.00 15,000.00 Jumlah Pekerja 328,500.00 Jumlah Bahan + Pekerja 968,500.00 Keuntungan Max. 10 % 96,850.00 Jumlah Total 1,065,350.00 Dibulatkan 1,065,350.00

A.06.13 1 M2 PASANGAN PINTU DAN JENDELA JALUSI KAYU LOKAL KLS IIBAHAN :Kayu Lokal Kls II , Papan 0.0640 m³ 4,018,200.00 257,164.80 Jumlah Bahan 257,164.80 UPAH :Pekerja 1.0000 Oh 60,000.00 60,000.00 Tukang Kayu 3.0000 Oh 75,000.00 225,000.00 Kepala Tukang 0.3000 Oh 95,000.00 28,500.00 Mandor 0.1500 Oh 100,000.00 15,000.00 Jumlah Pekerja 328,500.00 Jumlah Bahan + Pekerja 585,664.80 Keuntungan Max. 10 % 58,566.48 Jumlah Total 644,231.28 Dibulatkan 644,230.00

A.06.14 1 M2 PASANGAN PINTU PLYWOOD RANGKAP, RANGKA KAYU JATIBAHAN :Kayu Jati , Papan 0.0196 m³ 14,227,300.00 278,855.08 Paku Biasa 1/2" - 1" 0.0300 kg 16,400.00 492.00 Lem Kayu 0.3000 lt 23,600.00 7,080.00 Plywood 4' x 3' x 4 mm 1.0000 lbr 154,500.00 154,500.00 Jumlah Bahan 440,927.08 UPAH :Pekerja 0.6000 Oh 60,000.00 36,000.00 Tukang Kayu 2.0000 Oh 75,000.00 150,000.00 Kepala Tukang 0.2000 Oh 95,000.00 19,000.00 Mandor 0.0300 Oh 100,000.00 3,000.00 Jumlah Pekerja 208,000.00 Jumlah Bahan + Pekerja 648,927.08 Keuntungan Max. 10 % 64,892.71 Jumlah Total 713,819.79 Dibulatkan 713,810.00

A.06.15 1 M2 PASANGAN PINTU PLYWOOD RANGKAP, RANGKA KAYU KAMPER BANJARBAHAN :Kayu Kamper , Papan 0.0196 m³ 10,000,000.00 196,000.00 Paku Biasa 1/2" - 1" 0.0300 kg 16,400.00 492.00 Lem Kayu 0.3000 lt 23,600.00 7,080.00 Plywood 4' x 3' x 4 mm 1.0000 lbr 154,500.00 154,500.00 Jumlah Bahan 358,072.00 UPAH :Pekerja 0.6000 Oh 60,000.00 36,000.00 Tukang Kayu 2.0000 Oh 75,000.00 150,000.00 Kepala Tukang 0.2000 Oh 95,000.00 19,000.00 Mandor 0.0300 Oh 100,000.00 3,000.00 Jumlah Pekerja 208,000.00 Jumlah Bahan + Pekerja 566,072.00 Keuntungan Max. 10 % 56,607.20 Jumlah Total 622,679.20 Dibulatkan 622,670.00

Page 50: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 50+29

A.06.16 1 M2 PASANGAN PINTU PLYWOOD RANGKAP, RANGKA KAYU LOKAL KLS IIBAHAN :Kayu Lokal Kls II , Papan 0.0196 m³ 4,018,200.00 78,756.72 Paku Biasa 1/2" - 1" 0.0300 kg 16,400.00 492.00 Lem Kayu 0.3000 lt 23,600.00 7,080.00 Plywood 4' x 3' x 4 mm 1.0000 lbr 154,500.00 154,500.00 Jumlah Bahan 240,828.72 UPAH :Pekerja 0.6000 Oh 60,000.00 36,000.00 Tukang Kayu 2.0000 Oh 75,000.00 150,000.00 Kepala Tukang 0.2000 Oh 95,000.00 19,000.00 Mandor 0.0300 Oh 100,000.00 3,000.00 Jumlah Pekerja 208,000.00 Jumlah Bahan + Pekerja 448,828.72 Keuntungan Max. 10 % 44,882.87 Jumlah Total 493,711.59 Dibulatkan 493,710.00

A.06.17 1 M2 PASANGAN JALUSI MATI KUSEN KAYU JATIBAHAN :Kayu Jati, Papan 0.0600 m³ 14,227,300.00 853,638.00 Paku Biasa 1/2" - 1" 0.1500 kg 16,400.00 2,460.00 Jumlah Bahan 856,098.00 UPAH :Pekerja 0.5000 Oh 60,000.00 30,000.00 Tukang Kayu 2.0000 Oh 75,000.00 150,000.00 Kepala Tukang 0.2000 Oh 95,000.00 19,000.00 Mandor 0.0250 Oh 100,000.00 2,500.00 Jumlah Pekerja 201,500.00 Jumlah Bahan + Pekerja 1,057,598.00 Keuntungan Max. 10 % 105,759.80 Jumlah Total 1,163,357.80 Dibulatkan 1,163,350.00

A.06.18 1 M2 PASANGAN JALUSI MATI KUSEN KAYU KAMPERBAHAN :Kayu Kamper , Papan 0.0600 m³ 10,000,000.00 600,000.00 Paku Biasa 1/2" - 1" 0.1500 kg 16,400.00 2,460.00 Jumlah Bahan 602,460.00 UPAH :Pekerja 0.5000 Oh 60,000.00 30,000.00 Tukang Kayu 2.0000 Oh 75,000.00 150,000.00 Kepala Tukang 0.2000 Oh 95,000.00 19,000.00 Mandor 0.0250 Oh 100,000.00 2,500.00 Jumlah Pekerja 201,500.00 Jumlah Bahan + Pekerja 803,960.00 Keuntungan Max. 10 % 80,396.00 Jumlah Total 884,356.00 Dibulatkan 884,350.00

A.06.19 1 M2 PASANGAN JALUSI MATI KUSEN KAYU LOKAL KLS IIBAHAN :Kayu Lokal Kls II , Papan 0.0600 m³ 4,018,200.00 241,092.00 Paku Biasa 1/2" - 1" 0.1500 kg 16,400.00 2,460.00 Jumlah Bahan 243,552.00 UPAH :Pekerja 0.5000 Oh 60,000.00 30,000.00 Tukang Kayu 2.0000 Oh 75,000.00 150,000.00 Kepala Tukang 0.2000 Oh 95,000.00 19,000.00 Mandor 0.0250 Oh 100,000.00 2,500.00 Jumlah Pekerja 201,500.00 Jumlah Bahan + Pekerja 445,052.00 Keuntungan Max. 10 % 44,505.20 Jumlah Total 489,557.20 Dibulatkan 489,550.00

Page 51: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 51+29

A.06.20 1 M2 PASANGAN PINTU PLYWOOD RANGKAP, RANGKA KAYU LOKAL KLS IIBAHAN :Kayu KAYU LOKAL KLS II , Papan 0.0196 m³ 4,018,200.00 78,756.72 Paku Biasa 1/2" - 1" 0.0300 kg 16,400.00 492.00 Lem Kayu 0.3000 lt 23,600.00 7,080.00 Plywood 4' x 3' x 4 mm 1.0000 lbr 190,900.00 190,900.00 Jumlah Bahan 277,228.72 UPAH :Pekerja 0.6000 Oh 60,000.00 36,000.00 Tukang Kayu 2.0000 Oh 75,000.00 150,000.00 Kepala Tukang 0.2000 Oh 95,000.00 19,000.00 Mandor 0.0300 Oh 100,000.00 3,000.00 Jumlah Pekerja 208,000.00 Jumlah Bahan + Pekerja 485,228.72 Keuntungan Max. 10 % 48,522.87 Jumlah Total 533,751.59 Dibulatkan 533,750.00

A.06.21 1 M2 PASANG PINTU TEAKWOOD RANGKAP, RANGKA KAYU JATIBAHAN :Kayu Jati, Papan 0.0196 m³ 14,227,300.00 278,855.08 Paku Biasa 1/2" - 1" 0.3000 kg 16,400.00 4,920.00 Lem Kayu 0.3000 lt 23,600.00 7,080.00 Teakwood 4' x 8' x 4 mm 1.0000 lbr 156,900.00 156,900.00 Jumlah Bahan 447,755.08 UPAH :Pekerja 0.6000 Oh 60,000.00 36,000.00 Tukang Kayu 2.0000 Oh 75,000.00 150,000.00 Kepala Tukang 0.2000 Oh 95,000.00 19,000.00 Mandor 0.0300 Oh 100,000.00 3,000.00 Jumlah Pekerja 208,000.00 Jumlah Bahan + Pekerja 655,755.08 Keuntungan Max. 10 % 65,575.51 Jumlah Total 721,330.59 Dibulatkan 721,330.00

A.06.22 1 M2 PASANG PINTU TEAKWOOD RANGKAP, RANGKA KAYU KAMPER BANJARBAHAN :Kayu Kamper, Papan 0.0196 m³ 10,000,000.00 196,000.00 Paku Biasa 1/2" - 1" 0.3000 kg 16,400.00 4,920.00 Lem Kayu 0.3000 lt 23,600.00 7,080.00 Teakwood 4' x 8' x 4 mm 1.0000 lbr 156,900.00 156,900.00 Jumlah Bahan 364,900.00 UPAH :Pekerja 0.6000 Oh 60,000.00 36,000.00 Tukang Kayu 2.0000 Oh 75,000.00 150,000.00 Kepala Tukang 0.2000 Oh 95,000.00 19,000.00 Mandor 0.0300 Oh 100,000.00 3,000.00 Jumlah Pekerja 208,000.00 Jumlah Bahan + Pekerja 572,900.00 Keuntungan Max. 10 % 57,290.00 Jumlah Total 630,190.00 Dibulatkan 630,190.00

A.06.23 1 M2 PASANG PINTU TEAKWOOD RANGKAP, RANGKA KAYU LOKAL KLS IIBAHAN :Kayu Lokal Kls II, Papan 0.0196 m³ 4,018,200.00 78,756.72 Paku Biasa 1/2" - 1" 0.3000 kg 16,400.00 4,920.00 Lem Kayu 0.3000 lt 23,600.00 7,080.00 Teakwood 4' x 8' x 4 mm 1.0000 lbr 156,900.00 156,900.00 Jumlah Bahan 247,656.72 UPAH :Pekerja 0.6000 Oh 60,000.00 36,000.00 Tukang Kayu 2.0000 Oh 75,000.00 150,000.00 Kepala Tukang 0.2000 Oh 95,000.00 19,000.00 Mandor 0.0300 Oh 100,000.00 3,000.00 Jumlah Pekerja 208,000.00 Jumlah Bahan + Pekerja 455,656.72 Keuntungan Max. 10 % 45,565.67 Jumlah Total 501,222.39 Dibulatkan 501,220.00

Page 52: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 52+29

A.06.24 1 M2 PASANG PINTU POLYWOOD & FORMIKA RANGKAP, RANGKA KAYU JATIBAHAN :Kayu Jati, Papan 0.0196 m³ 14,227,300.00 278,855.08 Paku Biasa 1/2" - 1" 0.3000 kg 16,400.00 4,920.00 Lem Kayu 0.8000 lt 23,600.00 18,880.00 Polywood 4' x 8' x 4 mm 1.0000 lbr 190,900.00 190,900.00 Formica 0.5000 lbr 170,900.00 85,450.00 Jumlah Bahan 579,005.08 UPAH :Pekerja 0.8000 Oh 60,000.00 48,000.00 Tukang Kayu 2.5000 Oh 75,000.00 187,500.00 Kepala Tukang 0.2500 Oh 95,000.00 23,750.00 Mandor 0.0400 Oh 100,000.00 4,000.00 Jumlah Pekerja 263,250.00 Jumlah Bahan + Pekerja 842,255.08 Keuntungan Max. 10 % 84,225.51 Jumlah Total 926,480.59 Dibulatkan 926,480.00

A.06.25 1 M2 PASANG PINTU POLYWOOD & FORMIKA RANGKA KAYU KAMPER BANJARBAHAN :Kayu Kamper, Papan 0.0196 m³ 10,000,000.00 196,000.00 Paku Biasa 1/2" - 1" 0.3000 kg 16,400.00 4,920.00 Lem Kayu 0.8000 lt 23,600.00 18,880.00 Polywood 4' x 8' x 4 mm 1.0000 lbr 190,900.00 190,900.00 Formica 4" x 3 " 0.5000 lbr 170,900.00 85,450.00 Jumlah Bahan 496,150.00 UPAH :Pekerja 0.8000 Oh 60,000.00 48,000.00 Tukang Kayu 2.5000 Oh 75,000.00 187,500.00 Kepala Tukang 0.2500 Oh 95,000.00 23,750.00 Mandor 0.0400 Oh 100,000.00 4,000.00 Jumlah Pekerja 263,250.00 Jumlah Bahan + Pekerja 759,400.00 Keuntungan Max. 10 % 75,940.00 Jumlah Total 835,340.00 Dibulatkan 835,340.00

A.06.26 1 M2 PASANG PINTU POLYWOOD & FORMIKA RANGKA KAYU LOKAL KLS IIBAHAN :Kayu Lokal Kls II, Papan 0.0196 m³ 4,018,200.00 78,756.72 Paku Biasa 1/2" - 1" 0.3000 kg 16,400.00 4,920.00 Lem Kayu 0.8000 lt 23,600.00 18,880.00 Polywood 4' x 8' x 4 mm 1.0000 lbr 154,500.00 154,500.00 Formica 4" x 3 " 0.5000 lbr 170,900.00 85,450.00 Jumlah Bahan 342,506.72 UPAH :Pekerja 0.8000 Oh 60,000.00 48,000.00 Tukang Kayu 2.5000 Oh 75,000.00 187,500.00 Kepala Tukang 0.2500 Oh 95,000.00 23,750.00 Mandor 0.0400 Oh 100,000.00 4,000.00 Jumlah Pekerja 263,250.00 Jumlah Bahan + Pekerja 605,756.72 Keuntungan Max. 10 % 60,575.67 Jumlah Total 666,332.39 Dibulatkan 666,330.00

A.06.27 1 M2 PASANG PINTU TEAKWOOD & FORMIKA RANGKA KAYU JATIBAHAN :Kayu Jati, Papan 0.0196 m³ 14,227,300.00 278,855.08 Paku Biasa 1/2" - 1" 0.3000 kg 16,400.00 4,920.00 Lem Kayu 0.8000 lt 23,600.00 18,880.00 Teakwood 4' x 8' x 4 mm 0.5000 lbr 156,900.00 78,450.00 Formica 4" x 8 " 0.5000 lbr 170,900.00 85,450.00 Jumlah Bahan 466,555.08 UPAH :Pekerja 0.8000 Oh 60,000.00 48,000.00 Tukang Kayu 2.5000 Oh 75,000.00 187,500.00 Kepala Tukang 0.2500 Oh 95,000.00 23,750.00 Mandor 0.0400 Oh 100,000.00 4,000.00 Jumlah Pekerja 263,250.00 Jumlah Bahan + Pekerja 729,805.08 Keuntungan Max. 10 % 72,980.51 Jumlah Total 802,785.59 Dibulatkan 802,780.00

Page 53: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 53+29

A.06.28 1 M2 PASANG PINTU TEAKWOOD & FORMIKA RANGKA KAYU KAMPER BANJAR (DIVERNIS)BAHAN :Kayu Kamper, Papan 0.0196 m³ 10,000,000.00 196,000.00 Paku Biasa 1/2" - 1" 0.3000 kg 16,400.00 4,920.00 Lem Kayu 0.8000 lt 23,600.00 18,880.00 Teakwood 4' x 8' x 4 mm 0.5000 lbr 156,900.00 78,450.00 Formica 4" x 8 " 0.5000 lbr 170,900.00 85,450.00 Vernis 0.5000 ltr 29,100.00 14,550.00 Jumlah Bahan 398,250.00 UPAH :Pekerja 0.8000 Oh 60,000.00 48,000.00 Tukang Kayu 2.5000 Oh 75,000.00 187,500.00 Kepala Tukang 0.2500 Oh 95,000.00 23,750.00 Mandor 0.0400 Oh 100,000.00 4,000.00 Jumlah Pekerja 263,250.00 Jumlah Bahan + Pekerja 661,500.00 Keuntungan Max. 10 % 66,150.00 Jumlah Total 727,650.00 Dibulatkan 727,650.00

A.06.29 1 M2 PASANG PINTU TEAKWOOD & FORMIKA RANGKA KAYU LOKAL KLS II (DIVERNIS)BAHAN :Kayu Lokal Kls II, Papan 0.0196 m³ 4,018,200.00 78,756.72 Paku Biasa 1/2" - 1" 0.3000 kg 16,400.00 4,920.00 Lem Kayu 0.8000 lt 23,600.00 18,880.00 Teakwood 4' x 8' x 4 mm 0.5000 lbr 156,900.00 78,450.00 Formica 4" x 8 " 0.5000 lbr 170,900.00 85,450.00 Vernis 0.5000 ltr 29,100.00 14,550.00 Jumlah Bahan 281,006.72 UPAH :Pekerja 0.8000 Oh 60,000.00 48,000.00 Tukang Kayu 2.5000 Oh 75,000.00 187,500.00 Kepala Tukang 0.2500 Oh 95,000.00 23,750.00 Mandor 0.0400 Oh 100,000.00 4,000.00 Jumlah Pekerja 263,250.00 Jumlah Bahan + Pekerja 544,256.72 Keuntungan Max. 10 % 54,425.67 Jumlah Total 598,682.39 Dibulatkan 598,680.00

A.06.30 1 M2 PASANG PINTU FORMIKA DOUBLE, RANGKA KAYU JATIBAHAN :Kayu Jati, Papan 0.0196 m³ 14,227,300.00 278,855.08 Paku Biasa 1/2" - 1" 0.3000 kg 16,400.00 4,920.00 Lem Kayu 1.2000 lt 23,600.00 28,320.00 Polywood 4' x 8' x 4 mm 1.0000 lbr 190,900.00 190,900.00 Formica 4" x 8 " 1.0000 lbr 170,900.00 170,900.00 Jumlah Bahan 673,895.08 UPAH :Pekerja 1.0000 Oh 60,000.00 60,000.00 Tukang Kayu 2.6000 Oh 75,000.00 195,000.00 Kepala Tukang 0.2600 Oh 95,000.00 24,700.00 Mandor 0.0500 Oh 100,000.00 5,000.00 Jumlah Pekerja 284,700.00 Jumlah Bahan + Pekerja 958,595.08 Keuntungan Max. 10 % 95,859.51 Jumlah Total 1,054,454.59 Dibulatkan 1,054,450.00

A.06.31 1 M2 PASANG PINTU FORMIKA DOUBLE, RANGKA KAYU KAMPER BANJARBAHAN :Kayu Kamper, Papan 0.0196 m³ 10,000,000.00 196,000.00 Paku Biasa 1/2" - 1" 0.3000 kg 16,400.00 4,920.00 Lem Kayu 1.2000 lt 23,600.00 28,320.00 Polywood 4' x 8' x 4 mm 1.0000 lbr 190,900.00 190,900.00 Formica 4" x 8 " 1.0000 lbr 291,200.00 291,200.00 Jumlah Bahan 711,340.00 UPAH :Pekerja 1.0000 Oh 60,000.00 60,000.00 Tukang Kayu 2.6000 Oh 75,000.00 195,000.00 Kepala Tukang 0.2600 Oh 95,000.00 24,700.00 Mandor 0.0500 Oh 100,000.00 5,000.00 Jumlah Pekerja 284,700.00 Jumlah Bahan + Pekerja 996,040.00 Keuntungan Max. 10 % 99,604.00 Jumlah Total 1,095,644.00 Dibulatkan 1,095,640.00

Page 54: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 54+29

A.06.32 1 M2 PASANG PINTU FORMIKA DOUBLE, RANGKA KAYU LOKAL KLS IIBAHAN :Kayu Lokal Kls II, Papan 0.0196 m³ 4,018,200.00 78,756.72 Paku Biasa 1/2" - 1" 0.3000 kg 16,400.00 4,920.00 Lem Kayu 1.2000 lt 23,600.00 28,320.00 Polywood 4' x 8' x 4 mm 1.0000 lbr 154,500.00 154,500.00 Formica 4" x 8 " 1.0000 lbr 170,900.00 170,900.00 Jumlah Bahan 437,396.72 UPAH :Pekerja 1.0000 Oh 60,000.00 60,000.00 Tukang Kayu 2.6000 Oh 75,000.00 195,000.00 Kepala Tukang 0.2600 Oh 95,000.00 24,700.00 Mandor 0.0500 Oh 100,000.00 5,000.00 Jumlah Pekerja 284,700.00 Jumlah Bahan + Pekerja 722,096.72 Keuntungan Max. 10 % 72,209.67 Jumlah Total 794,306.39 Dibulatkan 794,300.00

A.06.33 1 M3 PASANG KONSTRUKSI KUDA - KUDA KAYU JATIBAHAN :Kayu Jati, Balok 1.1000 m³ 14,227,300.00 15,650,030.00 Paku Biasa 2" - 5" 5.8000 kg 16,400.00 95,120.00 Jumlah Bahan 15,745,150.00 UPAH :Pekerja 3.0000 Oh 60,000.00 180,000.00 Tukang Kayu 5.0000 Oh 75,000.00 375,000.00 Kepala Tukang 2.0000 Oh 95,000.00 190,000.00 Mandor 0.4000 Oh 100,000.00 40,000.00 Jumlah Pekerja 785,000.00 Jumlah Bahan + Pekerja 16,530,150.00 Keuntungan Max. 10 % 1,653,015.00 Jumlah Total 18,183,165.00 Dibulatkan 18,183,160.00

A.06.34 1 M3 PASANG KONSTRUKSI KUDA - KUDA KAYU KAMPER BANJARBAHAN :Kayu Kamper, Balok 1.1000 m³ 8,909,100.00 9,800,010.00 Paku Biasa 2" - 5" 5.8000 kg 16,400.00 95,120.00 Jumlah Bahan 9,895,130.00 UPAH :Pekerja 3.0000 Oh 60,000.00 180,000.00 Tukang Kayu 5.0000 Oh 75,000.00 375,000.00 Kepala Tukang 2.0000 Oh 95,000.00 190,000.00 Mandor 0.4000 Oh 100,000.00 40,000.00 Jumlah Pekerja 785,000.00 Jumlah Bahan + Pekerja 10,680,130.00 Keuntungan Max. 10 % 1,068,013.00 Jumlah Total 11,748,143.00 Dibulatkan 11,748,140.00

A.06.35 1 M3 PASANGAN KONSTRUKSI KUDA - KUDA KAYU KAYU LOKAL KLS IIBAHAN :Kayu KAYU LOKAL KLS II, Balok 1.1000 m³ 3,545,500.00 3,900,050.00 Paku Biasa 2" - 5" 5.8000 kg 16,400.00 95,120.00 Jumlah Bahan 3,995,170.00 UPAH :Pekerja 3.0000 Oh 60,000.00 180,000.00 Tukang Kayu 5.0000 Oh 75,000.00 375,000.00 Kepala Tukang 2.0000 Oh 95,000.00 190,000.00 Mandor 0.4000 Oh 100,000.00 40,000.00 Jumlah Pekerja 785,000.00 Jumlah Bahan + Pekerja 4,780,170.00 Keuntungan Max. 10 % 478,017.00 Jumlah Total 5,258,187.00 Dibulatkan 5,258,180.00

Page 55: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 55+29

A.06.36 1 M3 PASANG KONSTRUKSI KUDA - KUDA KAYU KRUINGBAHAN :Kayu Kruing, Balok 1.1000 m³ 5,454,500.00 5,999,950.00 Paku Biasa 2" - 5" 5.8000 kg 16,400.00 95,120.00 Jumlah Bahan 6,095,070.00 UPAH :Pekerja 3.0000 Oh 60,000.00 180,000.00 Tukang Kayu 5.0000 Oh 75,000.00 375,000.00 Kepala Tukang 2.0000 Oh 95,000.00 190,000.00 Mandor 0.4000 Oh 100,000.00 40,000.00 Jumlah Pekerja 785,000.00 Jumlah Bahan + Pekerja 6,880,070.00 Keuntungan Max. 10 % 688,007.00 Jumlah Total 7,568,077.00 Dibulatkan 7,568,070.00

A.06.37 1 M2 PASANG KASO + RENG GENTENG PALENTONG KAYU KAMPERBAHAN :Kayu Kamper, Balok 0.0120 m³ 8,909,100.00 106,909.20 Paku Biasa 2" - 5" 0.1500 kg 16,400.00 2,460.00 Jumlah Bahan 109,369.20 UPAH :Pekerja 0.1500 Oh 60,000.00 9,000.00 Tukang Kayu 0.1500 Oh 75,000.00 11,250.00 Kepala Tukang 0.0150 Oh 95,000.00 1,425.00 Mandor 0.0075 Oh 100,000.00 750.00 Jumlah Pekerja 22,425.00 Jumlah Bahan + Pekerja 131,794.20 Keuntungan Max. 10 % 13,179.42 Jumlah Total 144,973.62 Dibulatkan 144,970.00

A.06.38 1 M2 PASANG KASO + RENG GENTENG PALENTONG KAYU LOKAL KLS IIBAHAN :Kayu KAYU LOKAL KLS II, Balok 0.0142 m³ 3,545,500.00 50,346.10 Paku Biasa 2" - 5" 0.2500 kg 16,400.00 4,100.00 Jumlah Bahan 54,446.10 UPAH :Pekerja 0.1500 Oh 60,000.00 9,000.00 Tukang Kayu 0.1500 Oh 75,000.00 11,250.00 Kepala Tukang 0.0150 Oh 95,000.00 1,425.00 Mandor 0.0075 Oh 100,000.00 750.00 Jumlah Pekerja 22,425.00 Jumlah Bahan + Pekerja 76,871.10 Keuntungan Max. 10 % 7,687.11 Jumlah Total 84,558.21 Dibulatkan 84,550.00

A.06.39 1 M2 PASANG KASO + RENG GENTENG BETON KAYU KAYU LOKAL KLS IIBAHAN :Kayu KAYU LOKAL KLS II, Balok 0.0140 m³ 3,545,500.00 49,637.00 Paku Biasa 2" - 5" 0.1500 kg 16,400.00 2,460.00 Jumlah Bahan 52,097.00 UPAH :Pekerja 0.1500 Oh 60,000.00 9,000.00 Tukang Kayu 0.1500 Oh 75,000.00 11,250.00 Kepala Tukang 0.0150 Oh 95,000.00 1,425.00 Mandor 0.0075 Oh 100,000.00 750.00 Jumlah Pekerja 22,425.00 Jumlah Bahan + Pekerja 74,522.00 Keuntungan Max. 10 % 7,452.20 Jumlah Total 81,974.20 Dibulatkan 81,970.00

A.06.40 1 M3 PASANG KASO + RENG ATAP SIRAP KAYU KAMPER BANJARBAHAN :Kayu Kamper, Balok 0.0165 m³ 8,909,100.00 147,000.15 Paku Biasa 2" - 5" 0.2000 kg 16,400.00 3,280.00 Jumlah Bahan 150,280.15 UPAH :Pekerja 0.1500 Oh 60,000.00 9,000.00 Tukang Kayu 0.1500 Oh 75,000.00 11,250.00 Kepala Tukang 0.0150 Oh 95,000.00 1,425.00 Mandor 0.0075 Oh 100,000.00 750.00 Jumlah Pekerja 22,425.00 Jumlah Bahan + Pekerja 172,705.15 Keuntungan Max. 10 % 17,270.52 Jumlah Total 189,975.66 Dibulatkan 189,970.00

A.06.41 1 M3 PASANG KASO + RENG ATAP SIRAP KAYU KAYU LOKAL KLS II

Page 56: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 56+29

BAHAN :Kayu KAYU LOKAL KLS II, Balok 0.0165 m³ 3,545,500.00 58,500.75 Paku Biasa 2" - 5" 0.2000 kg 16,400.00 3,280.00 Jumlah Bahan 61,780.75 UPAH :Pekerja 0.1200 Oh 60,000.00 7,200.00 Tukang Kayu 0.1200 Oh 75,000.00 9,000.00 Kepala Tukang 0.0120 Oh 95,000.00 1,140.00 Mandor 0.0060 Oh 100,000.00 600.00 Jumlah Pekerja 17,940.00 Jumlah Bahan + Pekerja 79,720.75 Keuntungan Max. 10 % 7,972.08 Jumlah Total 87,692.83 Dibulatkan 87,690.00

A.06.42 1 M3 PASANG RANGKA LANGIT - LANGIT (1,00 x 1,00) m, KAYU JATIBAHAN :Kayu Jati, Balok 0.0120 m³ 12,409,100.00 148,909.20 Paku Biasa 2" - 5" 0.1000 kg 16,400.00 1,640.00 Jumlah Bahan 150,549.20 UPAH :Pekerja 0.1500 Oh 60,000.00 9,000.00 Tukang Kayu 0.2500 Oh 75,000.00 18,750.00 Kepala Tukang 0.0250 Oh 95,000.00 2,375.00 Mandor 0.0750 Oh 100,000.00 7,500.00 Jumlah Pekerja 37,625.00 Jumlah Bahan + Pekerja 188,174.20 Keuntungan Max. 10 % 18,817.42 Jumlah Total 206,991.62 Dibulatkan 206,990.00

A.06.43 1 M3 PASANG RANGKA LANGIT - LANGIT (1,00 x 1,00) m, KAYU KAMPERBAHAN :Kayu Kamper, Balok 0.0120 m³ 8,909,100.00 106,909.20 Paku Biasa 2" - 5" 0.1000 kg 16,400.00 1,640.00 Jumlah Bahan 108,549.20 UPAH :Pekerja 0.1500 Oh 60,000.00 9,000.00 Tukang Kayu 0.2500 Oh 75,000.00 18,750.00 Kepala Tukang 0.0250 Oh 95,000.00 2,375.00 Mandor 0.0750 Oh 100,000.00 7,500.00 Jumlah Pekerja 37,625.00 Jumlah Bahan + Pekerja 146,174.20 Keuntungan Max. 10 % 14,617.42 Jumlah Total 160,791.62 Dibulatkan 160,790.00

A.06.44 1 M3 PASANG RANGKA LANGIT - LANGIT (1,00 x 1,00) m, KAYU KAYU LOKAL KLS IIBAHAN :Kayu KAYU LOKAL KLS II, Balok 0.0120 m³ 3,545,500.00 42,546.00 Paku Biasa 2" - 5" 0.1000 kg 16,400.00 1,640.00 Jumlah Bahan 42,546.00 UPAH :Pekerja 0.1500 Oh 60,000.00 9,000.00 Tukang Kayu 0.2500 Oh 75,000.00 18,750.00 Kepala Tukang 0.0250 Oh 95,000.00 2,375.00 Mandor 0.0750 Oh 100,000.00 7,500.00 Jumlah Pekerja 37,625.00 Jumlah Bahan + Pekerja 80,171.00 Keuntungan Max. 10 % 8,017.10 Jumlah Total 88,188.10 Dibulatkan 88,180.00

A.06.45 1 M2 PASANG LISPLANG UKURAN (3 x 20) cm, KAYU JATIBAHAN :Kayu Jati, Papan 0.0072 m³ 12,409,100.00 89,345.52 Paku Biasa 2" - 5" 0.0500 kg 16,400.00 820.00 Jumlah Bahan 90,165.52 UPAH :Pekerja 0.1000 Oh 60,000.00 6,000.00 Tukang Kayu 0.2000 Oh 75,000.00 15,000.00 Kepala Tukang 0.0250 Oh 95,000.00 2,375.00 Mandor 0.0050 Oh 100,000.00 500.00 Jumlah Pekerja 23,875.00 Jumlah Bahan + Pekerja 114,040.52 Keuntungan Max. 10 % 11,404.05 Jumlah Total 125,444.57 Dibulatkan 125,440.00

A.06.46 1 M2 PASANG LISPLANG UKURAN (3 x 20) cm, KAYU KAMPER BANJARBAHAN :

Page 57: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 57+29

Kayu Kamper, Papan 0.0072 m³ 10,000,000.00 72,000.00 Paku Biasa 2" - 5" 0.0500 kg 16,400.00 820.00 Jumlah Bahan 72,820.00 UPAH :Pekerja 0.1000 Oh 60,000.00 6,000.00 Tukang Kayu 0.2000 Oh 75,000.00 15,000.00 Kepala Tukang 0.0200 Oh 95,000.00 1,900.00 Mandor 0.0050 Oh 100,000.00 500.00 Jumlah Pekerja 23,400.00 Jumlah Bahan + Pekerja 96,220.00 Keuntungan Max. 10 % 9,622.00 Jumlah Total 105,842.00 Dibulatkan 105,840.00

A.06.47 1 M2 PASANG LISPLANG UKURAN (3 x 20) cm, KAYU LOKAL KLS IIBAHAN :Kayu Lokal Kls II, Papan 0.0072 m³ 4,018,200.00 28,931.04 Paku Biasa 2" - 5" 0.0500 kg 16,400.00 820.00 Jumlah Bahan 29,751.04 UPAH :Pekerja 0.1000 Oh 60,000.00 6,000.00 Tukang Kayu 0.2000 Oh 75,000.00 15,000.00 Kepala Tukang 0.0200 Oh 95,000.00 1,900.00 Mandor 0.0050 Oh 100,000.00 500.00 Jumlah Pekerja 23,400.00 Jumlah Bahan + Pekerja 53,151.04 Keuntungan Max. 10 % 5,315.10 Jumlah Total 58,466.14 Dibulatkan 58,460.00

A.06.48 1 M2 PASANG LISPLANG UKURAN (3 x 30) cm, KAYU JATIBAHAN :Kayu Jati, Papan 0.0110 m³ 14,227,300.00 156,500.30 Paku Biasa 2" - 5" 0.0500 kg 16,400.00 820.00 Jumlah Bahan 157,320.30 UPAH :Pekerja 0.1100 Oh 60,000.00 6,600.00 Tukang Kayu 0.2200 Oh 75,000.00 16,500.00 Kepala Tukang 0.0220 Oh 95,000.00 2,090.00 Mandor 0.0050 Oh 100,000.00 500.00 Jumlah Pekerja 25,690.00 Jumlah Bahan + Pekerja 183,010.30 Keuntungan Max. 10 % 18,301.03 Jumlah Total 201,311.33 Dibulatkan 201,310.00

A.06.49 1 M2 PASANG LISPLANG UKURAN (3 x 30) cm, KAYU KAMPER BANJARBAHAN :Kayu Kamper , Papan 0.0110 m³ 10,000,000.00 110,000.00 Paku Biasa 2" - 5" 0.0500 kg 16,400.00 820.00 Jumlah Bahan 110,820.00 UPAH :Pekerja 0.1100 Oh 60,000.00 6,600.00 Tukang Kayu 0.2200 Oh 75,000.00 16,500.00 Kepala Tukang 0.0220 Oh 95,000.00 2,090.00 Mandor 0.0050 Oh 100,000.00 500.00 Jumlah Pekerja 25,690.00 Jumlah Bahan + Pekerja 136,510.00 Keuntungan Max. 10 % 13,651.00 Jumlah Total 150,161.00 Dibulatkan 150,160.00

A.06.50 1 M2 PASANG LISPLANG UKURAN (3 x 30) cm, KAYU LOKAL KLS IIBAHAN :Kayu Lokal Kls II , Papan 0.0110 m³ 4,018,200.00 44,200.20 Paku Biasa 2" - 5" 0.0500 kg 16,400.00 820.00 Jumlah Bahan 45,020.20 UPAH :Pekerja 0.1100 Oh 60,000.00 6,600.00 Tukang Kayu 0.2200 Oh 75,000.00 16,500.00 Kepala Tukang 0.0220 Oh 95,000.00 2,090.00 Mandor 0.0050 Oh 100,000.00 500.00 Jumlah Pekerja 25,690.00 Jumlah Bahan + Pekerja 70,710.20 Keuntungan Max. 10 % 7,071.02 Jumlah Total 77,781.22 Dibulatkan 77,780.00

A.06.51 1 M2 PASANG LISPLANG UKURAN 2 x (3 x 20) cm, KAYU KAMPER BANJARBAHAN :Kayu Kamper, Papan 0.0145 m³ 10,000,000.00 145,000.00

Page 58: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 58+29

Paku Biasa 2" - 5" 0.0600 kg 16,400.00 984.00 Jumlah Bahan 145,984.00 UPAH :Pekerja 0.1500 Oh 60,000.00 9,000.00 Tukang Kayu 0.2500 Oh 75,000.00 18,750.00 Kepala Tukang 0.0250 Oh 95,000.00 2,375.00 Mandor 0.0750 Oh 100,000.00 7,500.00 Jumlah Pekerja 37,625.00 Jumlah Bahan + Pekerja 183,609.00 Keuntungan Max. 10 % 18,360.90 Jumlah Total 201,969.90 Dibulatkan 201,960.00

A.06.52 1 M2 PASANG LISPLANG UKURAN 2 x (2 x 20) cm, KAYU KAMPER BANJARBAHAN :Kayu Kamper, Papan 0.0086 m³ 10,000,000.00 86,000.00 Paku Biasa 2" - 5" 0.0600 kg 16,400.00 984.00 Jumlah Bahan 86,984.00 UPAH :Pekerja 0.1000 Oh 60,000.00 6,000.00 Tukang Kayu 0.1000 Oh 75,000.00 7,500.00 Kepala Tukang 0.0100 Oh 95,000.00 950.00 Mandor 0.0500 Oh 100,000.00 5,000.00 Jumlah Pekerja 19,450.00 Jumlah Bahan + Pekerja 106,434.00 Keuntungan Max. 10 % 10,643.40 Jumlah Total 117,077.40 Dibulatkan 117,070.00

A.06.53 1 M2 PASANG LISPLANG UKURAN 2 x (2 x 20) cm, KAYU LOKAL KLS IIBAHAN :Kayu KAYU LOKAL KLS II, Papan 0.0088 m³ 4,018,200.00 35,360.16 Paku Biasa 2" - 5" 0.0600 kg 16,400.00 984.00 Jumlah Bahan 36,344.16 UPAH :Pekerja 0.1000 Oh 60,000.00 6,000.00 Tukang Kayu 0.1000 Oh 75,000.00 7,500.00 Kepala Tukang 0.0100 Oh 95,000.00 950.00 Mandor 0.0500 Oh 100,000.00 5,000.00 Jumlah Pekerja 19,450.00 Jumlah Bahan + Pekerja 55,794.16 Keuntungan Max. 10 % 5,579.42 Jumlah Total 61,373.58 Dibulatkan 61,370.00

A.06.54 1 M2 PASANG RANGKA DINDING PEMISAH KAYU KAMPER BANJARBAHAN :Kayu Kamper, Balok 0.0195 m³ 8,909,100.00 173,727.45 Kayu Kamper, Papan 0.0070 m³ 11,909,100.00 83,363.70 Paku Biasa 2" - 5" 0.1000 kg 16,400.00 1,640.00 Jumlah Bahan 258,731.15 UPAH :Pekerja 0.1500 Oh 60,000.00 9,000.00 Tukang Kayu 0.4500 Oh 75,000.00 33,750.00 Kepala Tukang 0.0450 Oh 95,000.00 4,275.00 Mandor 0.0225 Oh 100,000.00 2,250.00 Jumlah Pekerja 49,275.00 Jumlah Bahan + Pekerja 308,006.15 Keuntungan Max. 10 % 30,800.62 Jumlah Total 338,806.77 Dibulatkan 338,800.00

Page 59: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 59+29

A.06.55 1 M2 PASANG RANGKA DINDING PEMISAH KAYU KAYU LOKAL KLS IIBAHAN :Kayu KAYU LOKAL KLS II , Balok 0.0195 m³ 3,545,500.00 69,137.25 Kayu KAYU LOKAL KLS II, Papan 0.0070 m³ 4,018,200.00 28,127.40 Paku Biasa 2" - 5" 0.1000 kg 16,400.00 1,640.00 Jumlah Bahan 98,904.65 UPAH :Pekerja 0.1500 Oh 60,000.00 9,000.00 Tukang Kayu 0.4500 Oh 75,000.00 33,750.00 Kepala Tukang 0.0450 Oh 95,000.00 4,275.00 Mandor 0.0225 Oh 100,000.00 2,250.00 Jumlah Pekerja 49,275.00 Jumlah Bahan + Pekerja 148,179.65 Keuntungan Max. 10 % 14,817.97 Jumlah Total 162,997.62 Dibulatkan 162,990.00

A.06.56 1 M2 PASANG DINDING PEMISAH , RANGKA KAYU KAMPER BANJARBAHAN :Kayu Kamper, Balok 0.0195 m³ 8,909,100.00 173,727.45 Kayu Kamper, Papan 0.0070 m³ 11,909,100.00 83,363.70 Paku Biasa 2" - 5" 0.1000 kg 16,400.00 1,640.00 Jumlah Bahan 258,731.15 UPAH :Pekerja 0.1500 Oh 60,000.00 9,000.00 Tukang Kayu 0.4500 Oh 75,000.00 33,750.00 Kepala Tukang 0.0450 Oh 95,000.00 4,275.00 Mandor 0.0225 Oh 100,000.00 2,250.00 Jumlah Pekerja 49,275.00 Jumlah Bahan + Pekerja 308,006.15 Keuntungan Max. 10 % 30,800.62 Jumlah Total 338,806.77 Dibulatkan 338,800.00

A.06.57 1 M2 PASANG DINDING PEMISAH PLYWOOD RANGKAP, RANGKA KAYU KAMPER BANJARBAHAN :Kayu Kamper, Balok 0.0195 m³ 10,000,000.00 195,000.00 Kayu Kamper, Papan 0.0070 m³ 11,909,100.00 83,363.70 Paku Biasa 2" - 5" 0.1000 kg 16,400.00 1,640.00 Lem Kayu 0.5600 m³ 23,600.00 13,216.00 Plywood 4 mm 120 x 240 0.7000 Lbr 154,500.00 108,150.00 Jumlah Bahan 401,369.70 UPAH :Pekerja 0.2000 Oh 60,000.00 12,000.00 Tukang Kayu 0.6000 Oh 75,000.00 45,000.00 Kepala Tukang 0.0600 Oh 95,000.00 5,700.00 Mandor 0.0100 Oh 100,000.00 1,000.00 Jumlah Pekerja 63,700.00 Jumlah Bahan + Pekerja 465,069.70 Keuntungan Max. 10 % 46,506.97 Jumlah Total 511,576.67 Dibulatkan 511,570.00

A.06.58 1 M2 PASANG POLYWOOD TEBAL 4 mm, UNTUK DINDINGBAHAN :Plywood 4 mm 120 x 240 0.7000 lbr 154,500.00 108,150.00 Paku Biasa 1/2" - 1" 0.0500 kg 16,400.00 820.00 Jumlah Bahan 108,970.00 UPAH :Pekerja 0.0250 Oh 60,000.00 1,500.00 Tukang Kayu 0.0750 Oh 75,000.00 5,625.00 Kepala Tukang 0.0075 Oh 95,000.00 712.50 Mandor 0.0013 Oh 100,000.00 130.00 Jumlah Pekerja 7,967.50 Jumlah Bahan + Pekerja 116,937.50 Keuntungan Max. 10 % 11,693.75 Jumlah Total 128,631.25 Dibulatkan 128,630.00

Page 60: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 60+29

A.06.59 1 M1 PASANG LIST PLAFOND PROFIL KAYU KAMPER BANJAR 4/4 CMBAHAN :Kayu Profil 1.0500 m' 7,300.00 7,665.00 Jumlah Bahan 7,665.00 UPAH :Pekerja 0.0210 Oh 60,000.00 1,260.00 Tukang Kayu 0.0210 Oh 75,000.00 1,575.00 Kepala Tukang 0.0020 Oh 95,000.00 190.00 Mandor 0.0010 Oh 100,000.00 100.00 Jumlah Pekerja 3,125.00 Jumlah Bahan + Pekerja 10,790.00 Keuntungan Max. 10 % 1,079.00 Jumlah Total 11,869.00 Dibulatkan 11,860.00

A.06.60 1 M1 PASANG LIST PLAFOND PROFIL KAYU LOKAL KLS II 4/4BAHAN :Kayu Profil 1.0500 m' 4,000.00 4,200.00 Jumlah Bahan 4,200.00 UPAH :Pekerja 0.0210 Oh 60,000.00 1,260.00 Tukang Kayu 0.0210 Oh 75,000.00 1,575.00 Kepala Tukang 0.0020 Oh 95,000.00 190.00 Mandor 0.0010 Oh 100,000.00 100.00 Jumlah Pekerja 3,125.00 Jumlah Bahan + Pekerja 7,325.00 Keuntungan Max. 10 % 732.50 Jumlah Total 8,057.50 Dibulatkan 8,050.00

A.06.61 1 M2 PASANGAN PINTU PANEL KAYU LOKAL KLS II LAPIS ALUMUNIUMBAHAN :Kayu Lokal Kls II , Papan 0.0400 m³ 4,018,200.00 160,728.00 Aluminium 1.0000 146,700.00 146,700.00 Jumlah Bahan 307,428.00 UPAH :Pekerja 1.0000 Oh 60,000.00 60,000.00 Tukang Kayu 2.5000 Oh 75,000.00 187,500.00 Kepala Tukang 0.2500 Oh 95,000.00 23,750.00 Mandor 0.0500 Oh 100,000.00 5,000.00 Jumlah Pekerja 276,250.00 Jumlah Bahan + Pekerja 583,678.00 Keuntungan Max. 10 % 58,367.80 Jumlah Total 642,045.80 Dibulatkan 642,040.00

A.07.01 1 M3 MEMBUAT BETON TUMBUK, 1 Pc : 3 Ps : 5 KrBAHAN :Semen Portland 218.0000 kg 1,800.00 392,400.00 Pasir Beton 0.5200 M3 136,400.00 70,928.00 Batu Pecah Mesin 2/3 0.8700 M3 272,700.00 237,249.00 Jumlah Bahan 700,577.00 UPAH :Pekerja 1.6500 Oh 60,000.00 99,000.00 Tukang Batu 0.2500 Oh 75,000.00 18,750.00 Kepala Tukang 0.0250 Oh 95,000.00 2,375.00 Mandor 0.0800 Oh 100,000.00 8,000.00 Jumlah Pekerja 128,125.00 Jumlah Bahan + Pekerja 828,702.00 Keuntungan Max. 10 % 82,870.20 Jumlah Total 911,572.20 Dibulatkan 911,570.00

A.07.05 1 M3 MEMBUAT BETON BERTULANG 1 Pc : 2 Ps : 3 KrBAHAN :Semen Portland 232.0000 kg 1,800.00 417,600.00 Pasir Beton 0.5200 M3 136,400.00 70,928.00 Batu Pecah Mesin 2/3 0.7800 M3 272,700.00 212,706.00 Jumlah Bahan 701,234.00 UPAH :Pekerja 1.6500 Oh 60,000.00 99,000.00 Tukang Batu 0.2500 Oh 75,000.00 18,750.00 Kepala Tukang 0.0250 Oh 95,000.00 2,375.00 Mandor 0.0800 Oh 100,000.00 8,000.00 Jumlah Pekerja 128,125.00 Jumlah Bahan + Pekerja 829,359.00 Keuntungan Max. 10 % 82,935.90 Jumlah Total 912,294.90 Dibulatkan 912,290.00

m2

Page 61: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 61+29

A.07.13 1 M3 MEMBUAT BETON BERTULANG 1 Pc : 2 Ps : 3 KrBAHAN :Semen Portland 336.0000 kg 1,800.00 604,800.00 Pasir Beton 0.5400 m3 136,400.00 73,656.00 Batu Pecah Mesin 2/3 0.8100 m3 272,700.00 220,887.00 Jumlah Bahan 899,343.00 UPAH :Pekerja 2.0000 Oh 60,000.00 120,000.00 Tukang Batu 0.3500 Oh 75,000.00 26,250.00 Kepala Tukang 0.0350 Oh 95,000.00 3,325.00 Mandor 1.0000 Oh 100,000.00 100,000.00 Jumlah Pekerja 249,575.00 Jumlah Bahan + Pekerja 1,148,918.00 Keuntungan Max. 10 % 114,891.80 Jumlah Total 1,263,809.80 Dibulatkan 1,263,800.00

A.07.25 1 Kg PEMBESIAN DENGAN BESI POLOS ATAU BESI ULIRBAHAN :Besi Beton (Polos / ulir) 1.0500 kg 14,500.00 15,225.00 Kawat Beton 0.0150 kg 15,500.00 232.50 Jumlah Bahan 15,457.50 UPAH :Pekerja 0.0070 Oh 60,000.00 420.00 Tukang Besi 0.0070 Oh 75,000.00 525.00 Kepala Tukang 0.0007 Oh 95,000.00 66.50 Mandor 0.0003 Oh 100,000.00 30.00 Jumlah Pekerja 1,041.50 Jumlah Bahan + Pekerja 16,499.00 Keuntungan Max. 10 % 1,649.90 Jumlah Total 18,148.90 Dibulatkan 18,140.00

A.07.28 1 m2 PASANG BEKISTING UNTUK PONDASIBAHAN :Kayu Terentang Albasiah, Papan 0.0400 m³ 2,009,100.00 80,364.00 Paku Biasa 2" - 5" 0.3000 m³ 16,400.00 4,920.00 Minyak Bekisting 0.1000 ltr 36,600.00 3,660.00 Jumlah Bahan 88,944.00 UPAH :Pekerja 0.3000 Oh 60,000.00 18,000.00 Tukang Kayu 0.2600 Oh 75,000.00 19,500.00 Kepala Tukang 0.0260 Oh 95,000.00 2,470.00 Mandor 0.0050 Oh 100,000.00 500.00 Jumlah Pekerja 40,470.00 Jumlah Bahan + Pekerja 129,414.00 Keuntungan Max. 10 % 12,941.40 Jumlah Total 142,355.40 Dibulatkan 142,350.00

A.07.29 1 m2 PASANG BEKISTING UNTUK SLOOFBAHAN :Kayu Terentang Albasiah, Papan 0.0044 m³ 2,009,100.00 8,840.04 Paku Biasa 2" - 5" 0.3000 m³ 16,400.00 4,920.00 Minyak Bekisting 0.1000 m³ 36,600.00 3,660.00 Jumlah Bahan 17,420.04 UPAH :Pekerja 0.3000 Oh 60,000.00 18,000.00 Tukang Kayu 0.2600 Oh 75,000.00 19,500.00 Kepala Tukang 0.0260 Oh 95,000.00 2,470.00 Mandor 0.0050 Oh 100,000.00 500.00 Jumlah Pekerja 40,470.00 Jumlah Bahan + Pekerja 57,890.04 Keuntungan Max. 10 % 5,789.00 Jumlah Total 63,679.04 Dibulatkan 63,670.00

Page 62: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 62+29

A.07.30 1 m2 PASANG BEKISTING UNTUK KOLOMBAHAN :Kayu Terentang Albasiah, Papan 0.0040 m³ 2,009,100.00 8,036.40 Paku Biasa 2" - 5" 0.4000 kg 16,400.00 6,560.00 Minyak Bekisting 0.2000 ltr 36,600.00 7,320.00 Kayu Balok Albasiah 0.0015 m³ 2,000,000.00 3,000.00 Jumlah Bahan 24,916.40 UPAH :Pekerja 0.3000 Oh 60,000.00 18,000.00 Tukang Kayu 0.3300 Oh 75,000.00 24,750.00 Kepala Tukang 0.0330 Oh 95,000.00 3,135.00 Mandor 0.0060 Oh 100,000.00 600.00 Jumlah Pekerja 46,485.00 Jumlah Bahan + Pekerja 71,401.40 Keuntungan Max. 10 % 7,140.14 Jumlah Total 78,541.54 Dibulatkan 78,540.00

A.07.31 1 m2 PASANG BEKISTING UNTUK BALOKBAHAN :Kayu Terentang Albasiah, Papan 0.0040 m³ 2,009,100.00 8,036.40 Paku Biasa 2" - 5" 0.4000 kg 16,400.00 6,560.00 Minyak Bekisting 0.2000 ltr 36,600.00 7,320.00 Kayu Balok Albasiah 0.0018 m³ 2,000,000.00 3,600.00

2.0000 btg 106,400.00 212,800.00 Jumlah Bahan 238,316.40 UPAH :Pekerja 0.3200 Oh 60,000.00 19,200.00 Tukang Kayu 0.3300 Oh 75,000.00 24,750.00 Kepala Tukang 0.0330 Oh 95,000.00 3,135.00 Mandor 0.0060 Oh 100,000.00 600.00 Jumlah Pekerja 47,685.00 Jumlah Bahan + Pekerja 286,001.40 Keuntungan Max. 10 % 28,600.14 Jumlah Total 314,601.54 Dibulatkan 314,600.00

A.07.32 1 m2 PASANG BEKISTING UNTUK LANTAIBAHAN :Kayu Terentang Albasiah, Papan 0.0020 m³ 2,009,100.00 4,018.20 Paku Biasa 2" - 5" 0.4000 kg 16,400.00 6,560.00 Minyak Bekisting 0.2000 ltr 36,600.00 7,320.00 Kayu Balok Albasiah 0.0015 m³ 2,000,000.00 3,000.00 Polywood tebal 9 mm 0.3500 lbr 213,900.00 74,865.00

4.0000 btg 106,400.00 425,600.00 Jumlah Bahan 521,363.20 UPAH :Pekerja 0.3200 Oh 60,000.00 19,200.00 Tukang Kayu 0.3300 Oh 75,000.00 24,750.00 Kepala Tukang 0.0330 Oh 95,000.00 3,135.00 Mandor 0.0060 Oh 100,000.00 600.00 Jumlah Pekerja 47,685.00 Jumlah Bahan + Pekerja 569,048.20 Keuntungan Max. 10 % 56,904.82 Jumlah Total 625,953.02 Dibulatkan 625,950.00

A.07.33 1 m2 PASANG BEKISTING UNTUK DINDINGBAHAN :Kayu Terentang 0.0300 m³ 2,009,100.00 60,273.00 Paku Biasa 2" - 5" 0.4000 kg 16,400.00 6,560.00 Minyak Bekisting 0.2000 ltr 36,600.00 7,320.00 Balok Kayu KAYU LOKAL KLS II 0.0200 m³ 5,909,100.00 118,182.00 Polywood tebal 9 mm 0.3500 lbr 213,900.00 74,865.00

3.0000 btg 106,400.00 319,200.00 Formtie / Penjaga Jarak Berkisar / Spacer 4.0000 bh - Jumlah Bahan 586,400.00 UPAH :Pekerja 0.3200 Oh 60,000.00 19,200.00 Tukang Kayu 0.3300 Oh 75,000.00 24,750.00 Kepala Tukang 0.0330 Oh 95,000.00 3,135.00 Mandor 0.0060 Oh 100,000.00 600.00 Jumlah Pekerja 47,685.00 Jumlah Bahan + Pekerja 634,085.00 Keuntungan Max. 10 % 63,408.50 Jumlah Total 697,493.50 Dibulatkan 697,490.00

Dolken Kayu Galam Ø - 8 - 10 / 4 m

Dolken Kayu Galam Ø - 8 - 10 / 4 m

Dolken Kayu Galam Ø - 8 - 10 / 4 m

Page 63: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 63+29

A.07.34 1 m2 PASANG BEKISTING UNTUK TANGGABAHAN :Kayu Terentang Albasiah, Papan 0.0030 m³ 2,009,100.00 6,027.30 Paku Biasa 2" - 5" 0.4000 kg 16,400.00 6,560.00 Minyak Bekisting 0.1500 ltr 36,600.00 5,490.00 Kayu Balok Albasiah 0.0015 m³ 2,000,000.00 3,000.00 Polywood tebal 9 mm 0.3500 lbr 213,900.00 74,865.00

2.0000 btg 106,400.00 212,800.00 Jumlah Bahan 308,742.30 UPAH :Pekerja 0.3200 Oh 60,000.00 19,200.00 Tukang Kayu 0.3300 Oh 75,000.00 24,750.00 Kepala Tukang 0.0330 Oh 95,000.00 3,135.00 Mandor 0.0060 Oh 100,000.00 600.00 Jumlah Pekerja 47,685.00 Jumlah Bahan + Pekerja 356,427.30 Keuntungan Max. 10 % 35,642.73 Jumlah Total 392,070.03 Dibulatkan 392,070.00

A.07.35 1 M3 MEMBUAT BETON DENGAN MUTU K 225BAHAN :Semen Portland 388.0000 kg 1,800.00 698,400.00 Pasir Beton 0.6500 m³ 136,400.00 88,660.00 Batu Pecah Mesin 2/3 0.6500 m³ 272,700.00 177,255.00 Jumlah Bahan 964,315.00 UPAH :Pekerja 6.0000 Oh 60,000.00 360,000.00 Tukang Batu 1.0000 Oh 75,000.00 75,000.00 Kepala Tukang 0.1000 Oh 95,000.00 9,500.00 Mandor 0.3000 Oh 100,000.00 30,000.00 Jumlah Pekerja 474,500.00 Jumlah Bahan + Pekerja 1,438,815.00 Keuntungan Max. 10 % 143,881.50 Jumlah Total 1,582,696.50 Dibulatkan 1,582,690.00

A.07.36 1 M3 MEMBUAT BETON DENGAN MUTU K 275BAHAN :Semen Portland 400.0000 kg 1,800.00 720,000.00 Pasir Beton 0.4000 m³ 136,400.00 54,560.00 Batu Pecah Mesin 2/3 0.8200 m³ 272,700.00 223,614.00 Jumlah Bahan 998,174.00 UPAH :Pekerja 6.0000 Oh 60,000.00 360,000.00 Tukan Batu 1.0000 Oh 75,000.00 75,000.00 Kepala Tukang 0.1000 Oh 95,000.00 9,500.00 Mandor 0.3000 Oh 100,000.00 30,000.00 Jumlah Pekerja 474,500.00 Jumlah Bahan + Pekerja 1,472,674.00 Keuntungan Max. 10 % 147,267.40 Jumlah Total 1,619,941.40 Dibulatkan 1,619,940.00

A.07.37 1 M2 PASANG TANGGA PENGECORANBAHAN :Kayu Terentang Albasiah, Papan 0.0264 m³ 2,009,100.00 53,040.24 Paku Biasa 2" - 5" 0.6000 kg 16,400.00 9,840.00

0.5000 btg 106,400.00 53,200.00 Jumlah Bahan 116,080.24 UPAH :Pekerja 0.1500 Oh 60,000.00 9,000.00 Tukang Batu 0.0500 Oh 75,000.00 3,750.00 Kepala Tukang 0.0050 Oh 95,000.00 475.00 Mandor 0.0070 Oh 100,000.00 700.00 Jumlah Pekerja 13,925.00 Jumlah Bahan + Pekerja 130,005.24 Keuntungan Max. 10 % 13,000.52 Jumlah Total 143,005.76 Dibulatkan 143,000.00

Dolken Kayu Galam Ø - 8 - 10 / 4 m

Dolken Kayu Galam Ø - 8 - 10 / 4 m

Page 64: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 64+29

A.07.38 1 M3 MEMBUAT PONDASI BETON BERTULANG (150 kg BESI + BEKISTNG)BAHAN :Kayu Terentang Albasiah, Papan 0.2000 m³ 2,009,100.00 401,820.00 Paku Biasa 2" - 5" 1.5000 kg 16,400.00 24,600.00 Minyak Bekisting 0.4000 lt 36,600.00 14,640.00 Besi Beton Polos 150.0000 kg 14,500.00 2,175,000.00 Kawat Beton 2.2500 kg 15,500.00 34,875.00 Semen Portland 323.0000 kg 1,800.00 581,400.00 Pasir Beton 0.5200 m3 136,400.00 70,928.00 Batu Pecah Mesin 2/3 0.7800 m3 272,700.00 212,706.00 Jumlah Bahan 3,515,969.00 UPAH :Pekerja 3.9000 Oh 60,000.00 234,000.00 Tukang Batu 0.3500 Oh 75,000.00 26,250.00 Tukang Kayu 1.0400 Oh 75,000.00 78,000.00 Tukang Besi 1.0500 Oh 75,000.00 78,750.00 Kepala Tukang 0.2450 Oh 95,000.00 23,275.00 Mandor 0.1650 Oh 100,000.00 16,500.00 Jumlah Pekerja 456,775.00 Jumlah Bahan + Pekerja 3,972,744.00 Keuntungan Max. 10 % 397,274.40 Jumlah Total 4,370,018.40 Dibulatkan 4,370,010.00

A.07.47 1 M3 MEMBUAT SLOOF 10/15 (202 Kg Besi + Bekesting)DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CMBAHAN :Bekesting Albasiah 0.4400 m³ 2,009,100.00 884,004.00 Paku 5 - 7 cm 1.5000 kg 16,400.00 24,600.00 Pelumas Bekesting 0.4000 lt 36,600.00 14,640.00 Besi Beton Polos U 24 202.0000 kg 14,500.00 2,929,000.00 Kawat Beton 2.2500 kg 15,500.00 34,875.00 Semen Portland 6.4600 zak 90,900.00 587,214.00 Pasir Beton 0.5200 m³ 136,400.00 70,928.00 Batu Pecah 2/3 0.7800 m³ 272,700.00 212,706.00 Jumlah Bahan 4,757,967.00 UPAH : Tukang Batu 0.3500 org 90,000.00 31,500.00 Tukang Kayu 1.0400 org 90,000.00 93,600.00 Tukang Besi 1.0500 org 90,000.00 94,500.00 Kepala Tukang 0.2450 org 95,000.00 23,275.00 Pekerja 3.0000 org 60,000.00 180,000.00 Mandor 0.1225 org 100,000.00 12,250.00 Jumlah Pekerja 435,125.00 Jumlah Bahan + Pekerja 5,193,092.00 Keuntungan Max. 10 % 519,309.20 Jumlah 5,712,401.20 Dibulatkan 5,712,400.00

A.07.48 1 M3 MEMBUAT SLOOF 12/15 (257,778 Kg Besi + Bekesting)DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 20 CMBAHAN :Bekesting Albasiah 0.3700 m³ 2,009,100.00 743,367.00 Paku 5 - 7 cm 1.5000 kg 16,400.00 24,600.00 Pelumas Bekesting 0.4000 lt 36,600.00 14,640.00 Besi Beton Polos U 24 257.7780 kg 14,500.00 3,737,781.00 Kawat Beton 2.2500 kg 15,500.00 34,875.00 Semen Portland 6.4600 zak 90,900.00 587,214.00 Pasir Beton 0.5200 m³ 136,400.00 70,928.00 Batu Pecah 2/3 0.7800 m³ 272,700.00 212,706.00 Jumlah Bahan 5,426,111.00 UPAH : Tukang Batu 0.3500 org 90,000.00 31,500.00 Tukang Kayu 1.0400 org 90,000.00 93,600.00 Tukang Besi 1.0500 org 90,000.00 94,500.00 Kepala Tukang 0.2450 org 95,000.00 23,275.00 Pembantu Tukang 3.0000 org 60,000.00 180,000.00 Mandor 0.1225 org 100,000.00 12,250.00 Jumlah Pekerja 435,125.00 Jumlah Bahan + Pekerja 5,861,236.00 Keuntungan Max. 10 % 586,123.60 Jumlah 6,447,359.60 Dibulatkan 6,447,350.00

Page 65: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 65+29

A.07.49 1 M3 MEMBUAT SLOOF 12/15 (170.78 Kg Besi + Bekesting)DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CMBAHAN :Bekesting Albasiah 0.3700 m³ 2,009,100.00 743,367.00 Paku 5 - 7 cm 1.5000 kg 16,400.00 24,600.00 Pelumas Bekesting 0.4000 lt 36,600.00 14,640.00 Besi Beton Polos U 24 170.7800 kg 14,500.00 2,476,310.00 Kawat Beton 2.2500 kg 15,500.00 34,875.00 Semen Portland 6.4600 zak 90,900.00 587,214.00 Pasir Beton 0.5200 m³ 136,400.00 70,928.00 Batu Pecah 2/3 0.7800 m³ 272,700.00 212,706.00 Jumlah Bahan 4,164,640.00 UPAH : Tukang Batu 0.3500 org 90,000.00 31,500.00 Tukang Kayu 1.0400 org 90,000.00 93,600.00 Tukang Besi 1.0500 org 90,000.00 94,500.00 Kepala Tukang 0.2450 org 95,000.00 23,275.00 Pembantu Tukang 3.0000 org 60,000.00 180,000.00 Mandor 0.1225 org 100,000.00 12,250.00 Jumlah Pekerja 435,125.00 Jumlah Bahan + Pekerja 4,599,765.00 Keuntungan Max. 10 % 459,976.50 Jumlah 5,059,741.50 Dibulatkan 5,059,740.00

A.07.50 1 M3 MEMBUAT SLOOF 15/20 (180,8889 Kg Besi + Bekesting)DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CMBAHAN :Bekesting Albasiah 0.2900 m³ 2,009,100.00 582,639.00 Paku 5 - 7 cm 1.5000 kg 16,400.00 24,600.00 Pelumas Bekesting 0.4000 lt 36,600.00 14,640.00 Besi Beton Polos U 24 180.8889 kg 14,500.00 2,622,889.05 Kawat Beton 2.2500 kg 15,500.00 34,875.00 Semen Portland 6.4600 zak 90,900.00 587,214.00 Pasir Beton 0.5200 m³ 136,400.00 70,928.00 Batu Pecah 2/3 0.7800 m³ 272,700.00 212,706.00 Jumlah Bahan 4,150,491.05 UPAH : Tukang Batu 0.3500 org 90,000.00 31,500.00 Tukang Kayu 1.0400 org 90,000.00 93,600.00 Tukang Besi 1.0500 org 90,000.00 94,500.00 Kepala Tukang 0.2450 org 95,000.00 23,275.00 Pembantu Tukang 3.0000 org 60,000.00 180,000.00 Mandor 0.1225 org 100,000.00 12,250.00 Jumlah Pekerja 435,125.00 Jumlah Bahan + Pekerja 4,585,616.05 Keuntungan Max. 10 % 458,561.61 Jumlah 5,044,177.66 Dibulatkan 5,044,170.00

A.07.51 1 M3 MEMBUAT SLOOF 15/20 (116.89 Kg Besi + Bekesting)DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CMBAHAN :Bekesting Albasiah 0.2900 m³ 2,009,100.00 582,639.00 Paku 5 - 7 cm 1.5000 kg 16,400.00 24,600.00 Pelumas Bekesting 0.4000 lt 36,600.00 14,640.00 Besi Beton Polos U 24 116.8900 kg 14,500.00 1,694,905.00 Kawat Beton 2.2500 kg 15,500.00 34,875.00 Semen Portland 6.4600 zak 90,900.00 587,214.00 Pasir Beton 0.5200 m³ 136,400.00 70,928.00 Batu Pecah 2/3 0.7800 m³ 272,700.00 212,706.00 Jumlah Bahan 3,222,507.00 UPAH : Tukang Batu 0.3500 org 90,000.00 31,500.00 Tukang Kayu 1.0400 org 90,000.00 93,600.00 Tukang Besi 1.0500 org 90,000.00 94,500.00 Kepala Tukang 0.2450 org 95,000.00 23,275.00 Pembantu Tukang 3.0000 org 60,000.00 180,000.00 Mandor 0.1225 org 100,000.00 12,250.00 Jumlah Pekerja 435,125.00 Jumlah Bahan + Pekerja 3,657,632.00 Keuntungan Max. 10 % 365,763.20 Jumlah 4,023,395.20 Dibulatkan 4,023,390.00

Page 66: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 66+29

A.07.52 1 M3 MEMBUAT KOLOM 12/12 (314.0964 Kg Besi + Bekesting)DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 20 CMBAHAN :Bekesting Albasiah 0.4000 m³ 2,009,100.00 803,640.00 Paku 5 - 7 cm 1.5000 kg 16,400.00 24,600.00 Pelumas Bekesting 0.4000 lt 36,600.00 14,640.00 Besi Beton Polos U 24 314.0964 kg 14,500.00 4,554,397.80 Kawat Beton 2.2500 kg 15,500.00 34,875.00 Semen Portland 6.4600 zak 90,900.00 587,214.00 Pasir Beton 0.5200 m³ 136,400.00 70,928.00 Batu Pecah 2/3 0.7800 m³ 272,700.00 212,706.00 Jumlah Bahan 6,303,000.80 UPAH : Tukang Batu 0.3500 org 90,000.00 31,500.00 Tukang Kayu 1.0400 org 90,000.00 93,600.00 Tukang Besi 1.0500 org 90,000.00 94,500.00 Kepala Tukang 0.2450 org 95,000.00 23,275.00 Pekerja 3.0000 org 60,000.00 180,000.00 Mandor 0.1225 org 100,000.00 12,250.00 Jumlah Pekerja 435,125.00 Jumlah Bahan + Pekerja 6,738,125.80 Keuntungan Max. 10 % 673,812.58 Jumlah 7,411,938.38 Dibulatkan 7,411,930.00

A.07.53 1 M3 MEMBUAT KOLOM 12/12 (208.864 Kg Besi + Bekesting)DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CMBAHAN :Bekesting Albasiah 0.4000 m³ 2,009,100.00 803,640.00 Paku 5 - 7 cm 1.5000 kg 16,400.00 24,600.00 Pelumas Bekesting 0.4000 lt 36,600.00 14,640.00 Besi Beton Polos U 24 208.8640 kg 14,500.00 3,028,528.00 Kawat Beton 2.2500 kg 15,500.00 34,875.00 Semen Portland 6.4600 zak 90,900.00 587,214.00 Pasir Beton 0.5200 m³ 136,400.00 70,928.00 Batu Pecah 2/3 0.7800 m³ 272,700.00 212,706.00 Jumlah Bahan 4,777,131.00 UPAH : Tukang Batu 0.3500 org 90,000.00 31,500.00 Tukang Kayu 1.0400 org 90,000.00 93,600.00 Tukang Besi 1.0500 org 90,000.00 94,500.00 Kepala Tukang 0.2450 org 95,000.00 23,275.00 Pekerja 3.0000 org 60,000.00 180,000.00 Mandor 0.1225 org 100,000.00 12,250.00 Jumlah Pekerja 435,125.00 Jumlah Bahan + Pekerja 5,212,256.00 Keuntungan Max. 10 % 521,225.60 Jumlah 5,733,481.60 Dibulatkan 5,733,480.00

A.07.54 1 M3 MEMBUAT KOLOM 15/15 (211,5556 Kg Besi + Bekesting)DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 20 CMBAHAN :Bekesting Albasiah 0.5300 m³ 2,009,100.00 1,064,823.00 Paku 5 - 7 cm 1.5000 kg 16,400.00 24,600.00 Pelumas Bekesting 0.4000 lt 36,600.00 14,640.00 Besi Beton Polos U 24 211.5556 kg 14,500.00 3,067,556.20 Kawat Beton 2.2500 kg 15,500.00 34,875.00 Semen Portland 6.4600 zak 90,900.00 587,214.00 Pasir Beton 0.5200 m³ 136,400.00 70,928.00 Batu Pecah 2/3 0.7800 m³ 272,700.00 212,706.00 Jumlah Bahan 5,077,342.20 UPAH : Tukang Batu 0.3500 org 90,000.00 31,500.00 Tukang Kayu 1.0400 org 90,000.00 93,600.00 Tukang Besi 1.0500 org 90,000.00 94,500.00 Kepala Tukang 0.2450 org 95,000.00 23,275.00 Pekerja 3.0000 org 60,000.00 180,000.00 Mandor 0.1225 org 100,000.00 12,250.00 Jumlah Pekerja 435,125.00 Jumlah Bahan + Pekerja 5,512,467.20 Keuntungan Max. 10 % 551,246.72 Jumlah 6,063,713.92 Dibulatkan 6,063,710.00

Page 67: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 67+29

A.07.55 1 M3 MEMBUAT KOLOM 15/15 (139.550 Kg Besi + Bekesting)DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CMBAHAN :Bekesting Albasiah 0.5300 m³ 2,009,100.00 1,064,823.00 Paku 5 - 7 cm 1.5000 kg 16,400.00 24,600.00 Pelumas Bekesting 0.4000 lt 36,600.00 14,640.00 Besi Beton Polos U 24 139.5500 kg 14,500.00 2,023,475.00 Kawat Beton 2.2500 kg 15,500.00 34,875.00 Semen Portland 6.4600 zak 90,900.00 587,214.00 Pasir Beton 0.5200 m³ 136,400.00 70,928.00 Batu Pecah 2/3 0.7800 m³ 272,700.00 212,706.00 Jumlah Bahan 4,033,261.00 UPAH : Tukang Batu 0.3500 org 90,000.00 31,500.00 Tukang Kayu 1.0400 org 90,000.00 93,600.00 Tukang Besi 1.0500 org 90,000.00 94,500.00 Kepala Tukang 0.2450 org 95,000.00 23,275.00 Pekerja 3.0000 org 60,000.00 180,000.00 Mandor 0.1225 org 100,000.00 12,250.00 Jumlah Pekerja 435,125.00 Jumlah Bahan + Pekerja 4,468,386.00 Keuntungan Max. 10 % 446,838.60 Jumlah 4,915,224.60 Dibulatkan 4,915,220.00

A.07.56 1 M3 MEMBUAT KOLOM 15/20 (180,8889 Kg Besi + Bekesting)DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CMBAHAN :Bekesting Albasiah 0.4700 m³ 2,009,100.00 944,277.00 Paku 5 - 7 cm 1.5000 kg 16,400.00 24,600.00 Pelumas Bekesting 0.4000 lt 36,600.00 14,640.00 Besi Beton Polos U 24 180.8889 kg 14,500.00 2,622,889.05 Kawat Beton 2.2500 kg 15,500.00 34,875.00 Semen Portland 6.4600 zak 90,900.00 587,214.00 Pasir Beton 0.5200 m³ 136,400.00 70,928.00 Batu Pecah 2/3 0.7800 m³ 272,700.00 212,706.00 Jumlah Bahan 4,512,129.05 UPAH : Tukang Batu 0.3500 org 90,000.00 31,500.00 Tukang Kayu 1.0400 org 90,000.00 93,600.00 Tukang Besi 1.0500 org 90,000.00 94,500.00 Kepala Tukang 0.2450 org 95,000.00 23,275.00 Pekerja 3.0000 org 60,000.00 180,000.00 Mandor 0.1225 org 100,000.00 12,250.00 Jumlah Pekerja 435,125.00 Jumlah Bahan + Pekerja 4,947,254.05 Keuntungan Max. 10 % 494,725.41 Jumlah 5,441,979.46 Dibulatkan 5,441,970.00

A.07.57 1 M3 MEMBUAT KOLOM 15/20 (116.889 Kg Besi + Bekesting)DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CMBAHAN :Bekesting Albasiah 0.4700 m³ 2,009,100.00 944,277.00 Paku 5 - 7 cm 1.5000 kg 16,400.00 24,600.00 Pelumas Bekesting 0.4000 lt 36,600.00 14,640.00 Besi Beton Polos U 24 116.8890 kg 14,500.00 1,694,890.50 Kawat Beton 2.2500 kg 15,500.00 34,875.00 Semen Portland 6.4600 zak 90,900.00 587,214.00 Pasir Beton 0.5200 m³ 136,400.00 70,928.00 Batu Pecah 2/3 0.7800 m³ 272,700.00 212,706.00 Jumlah Bahan 3,584,130.50 UPAH : Tukang Batu 0.3500 org 90,000.00 31,500.00 Tukang Kayu 1.0400 org 90,000.00 93,600.00 Tukang Besi 1.0500 org 90,000.00 94,500.00 Kepala Tukang 0.2450 org 95,000.00 23,275.00 Pekerja 3.0000 org 60,000.00 180,000.00 Mandor 0.1225 org 100,000.00 12,250.00 Jumlah Pekerja 435,125.00 Jumlah Bahan + Pekerja 4,019,255.50 Keuntungan Max. 10 % 401,925.55 Jumlah 4,421,181.05 Dibulatkan 4,421,180.00

Page 68: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 68+29

A.07.59 1 M3 MEMBUAT KOLOM 20/20 (142,333 Kg Besi + Bekesting)DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CMBAHAN :Bekesting Albasiah 0.4400 m³ 2,009,100.00 884,004.00 Paku 5 - 7 cm 1.5000 kg 16,400.00 24,600.00 Pelumas Bekesting 0.4000 lt 36,600.00 14,640.00 Besi Beton Polos U 24 142.3333 kg 14,500.00 2,063,832.85 Kawat Beton 2.2500 kg 15,500.00 34,875.00 Semen Portland 6.4600 zak 90,900.00 587,214.00 Pasir Beton 0.5200 m³ 136,400.00 70,928.00 Batu Pecah 2/3 0.7800 m³ 272,700.00 212,706.00 Jumlah Bahan 3,892,799.85 UPAH : Tukang Batu 0.3500 org 90,000.00 31,500.00 Tukang Kayu 1.0400 org 90,000.00 93,600.00 Tukang Besi 1.0500 org 90,000.00 94,500.00 Kepala Tukang 0.2450 org 95,000.00 23,275.00 Pekerja 3.0000 org 60,000.00 180,000.00 Mandor 0.1225 org 100,000.00 12,250.00 Jumlah Pekerja 435,125.00 Jumlah Bahan + Pekerja 4,327,924.85 Keuntungan Max. 10 % 432,792.49 Jumlah 4,760,717.34 Dibulatkan 4,760,710.00

A.07.60 1 M3 MEMBUAT KOLOM 20/20 (91.334 Kg Besi + Bekesting)DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CMBAHAN :Bekesting Albasiah 0.4400 m³ 2,009,100.00 884,004.00 Paku 5 - 7 cm 1.5000 kg 16,400.00 24,600.00 Pelumas Bekesting 0.4000 lt 36,600.00 14,640.00 Besi Beton Polos U 24 91.3340 kg 14,500.00 1,324,343.00 Kawat Beton 2.2500 kg 15,500.00 34,875.00 Semen Portland 6.4600 zak 90,900.00 587,214.00 Pasir Beton 0.5200 m³ 136,400.00 70,928.00 Batu Pecah 2/3 0.7800 m³ 272,700.00 212,706.00 Jumlah Bahan 3,153,310.00 UPAH : Tukang Batu 0.3500 org 90,000.00 31,500.00 Tukang Kayu 1.0400 org 90,000.00 93,600.00 Tukang Besi 1.0500 org 90,000.00 94,500.00 Kepala Tukang 0.2450 org 95,000.00 23,275.00 Pekerja 3.0000 org 60,000.00 180,000.00 Mandor 0.1225 org 100,000.00 12,250.00 Jumlah Pekerja 435,125.00 Jumlah Bahan + Pekerja 3,588,435.00 Keuntungan Max. 10 % 358,843.50 Jumlah 3,947,278.50 Dibulatkan 3,947,270.00

A.07.61 1 M3 MEMBUAT KOLOM 25/25 (99.6267 Kg Besi + Bekesting)DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CMBAHAN :Bekesting Albasiah 0.3500 m³ 2,009,100.00 703,185.00 Paku 5 - 7 cm 1.5000 kg 16,400.00 24,600.00 Pelumas Bekesting 0.4000 lt 36,600.00 14,640.00 Besi Beton Polos U 24 99.6267 kg 14,500.00 1,444,587.15 Kawat Beton 2.2500 kg 15,500.00 34,875.00 Semen Portland 6.4600 zak 90,900.00 587,214.00 Pasir Beton 0.5200 m³ 136,400.00 70,928.00 Batu Pecah 2/3 0.7800 m³ 272,700.00 212,706.00 Jumlah Bahan 3,092,735.15 UPAH : Tukang Batu 0.3500 org 90,000.00 31,500.00 Tukang Kayu 1.0400 org 90,000.00 93,600.00 Tukang Besi 1.0500 org 90,000.00 94,500.00 Kepala Tukang 0.2450 org 95,000.00 23,275.00 Pekerja 3.0000 org 60,000.00 180,000.00 Mandor 0.1225 org 100,000.00 12,250.00 Jumlah Pekerja 435,125.00 Jumlah Bahan + Pekerja 3,527,860.15 Keuntungan Max. 10 % 352,786.02 Jumlah 3,880,646.17 Dibulatkan 3,880,640.00

Page 69: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 69+29

A.07.62 1 M3 MEMBUAT KOLOM 30/30 (74,67 Kg Besi + Bekesting)DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CMBAHAN :Bekesting Albasiah 0.3500 m³ 2,009,100.00 703,185.00 Paku 5 - 7 cm 1.5000 kg 16,400.00 24,600.00 Pelumas Bekesting 0.4000 lt 36,600.00 14,640.00 Besi Beton Polos U 24 74.6700 kg 14,500.00 1,082,715.00 Kawat Beton 2.2500 kg 15,500.00 34,875.00 Semen Portland 6.4600 zak 20,900.00 135,014.00 Pasir Beton 0.5200 m³ 136,400.00 70,928.00 Batu Pecah 2/3 0.7800 m³ 272,700.00 212,706.00 Jumlah Bahan 2,278,663.00 UPAH : Tukang Batu 0.3500 org 90,000.00 31,500.00 Tukang Kayu 1.0400 org 90,000.00 93,600.00 Tukang Besi 1.0500 org 90,000.00 94,500.00 Kepala Tukang 0.2450 org 95,000.00 23,275.00 Pekerja 3.0000 org 60,000.00 180,000.00 Mandor 0.1225 org 100,000.00 12,250.00 Jumlah Pekerja 435,125.00 Jumlah Bahan + Pekerja 2,713,788.00 Keuntungan Max. 10 % 43,512.50 Jumlah 3,192,425.50 Dibulatkan 3,192,420.00

A.07.63 1 M3 MEMBUAT KOLOM 40/25 (153,067 Kg Besi + Bekesting)DENGAN TULANGAN 8 BATANG DIA 16 BEUGEL DIA 8 JARAK 15 CMBAHAN :Bekesting Albasiah 0.2900 m³ 2,009,100.00 582,639.00 Paku 5 - 7 cm 1.5000 kg 16,400.00 24,600.00 Pelumas Bekesting 0.4000 lt 36,600.00 14,640.00 Besi Beton Polos U 24 153.0670 kg 14,500.00 2,219,471.50 Kawat Beton 2.2500 kg 15,500.00 34,875.00 Semen Portland 6.4600 zak 20,900.00 135,014.00 Pasir Beton 0.5200 m³ 136,400.00 70,928.00 Batu Pecah 2/3 0.7800 m³ 272,700.00 212,706.00 Jumlah Bahan 3,294,873.50 UPAH : Tukang Batu 0.3500 org 90,000.00 31,500.00 Tukang Kayu 1.0400 org 90,000.00 93,600.00 Tukang Besi 1.0500 org 90,000.00 94,500.00 Kepala Tukang 0.2450 org 95,000.00 23,275.00 Pekerja 3.0000 org 60,000.00 180,000.00 Mandor 0.1225 org 100,000.00 12,250.00 Jumlah Pekerja 435,125.00 Jumlah Bahan + Pekerja 3,729,998.50 Keuntungan Max. 10 % 372,999.85 Jumlah 4,102,998.35 Dibulatkan 4,102,990.00

A.07.64 1 M3 MEMBUAT RING BALK 10/15 (202 Kg Besi + Bekesting)DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CMBAHAN :Bekesting Albasiah 0.4800 m³ 2,009,100.00 964,368.00 Paku 5 - 7 cm 1.5000 kg 16,400.00 24,600.00 Pelumas Bekesting 0.4000 lt 36,600.00 14,640.00 Besi Beton Polos U 24 202.0000 kg 14,500.00 2,929,000.00 Kawat Beton 2.2500 kg 15,500.00 34,875.00 Semen Portland 6.4600 zak 90,900.00 587,214.00 Pasir Beton 0.5200 m³ 136,400.00 70,928.00 Batu Pecah 2/3 0.7800 m³ 272,700.00 212,706.00 Jumlah Bahan 4,838,331.00 UPAH : Tukang Batu 0.3500 org 90,000.00 31,500.00 Tukang Kayu 1.0400 org 90,000.00 93,600.00 Tukang Besi 1.0500 org 90,000.00 94,500.00 Kepala Tukang 0.2450 org 95,000.00 23,275.00 Pekerja 3.0000 org 60,000.00 180,000.00 Mandor 0.1225 org 100,000.00 12,250.00 Jumlah Pekerja 435,125.00 Jumlah Bahan + Pekerja 5,273,456.00 Keuntungan Max. 10 % 527,345.60 Jumlah 5,800,801.60 Dibulatkan 5,800,800.00

Page 70: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 70+29

A.07.65 1 M3 MEMBUAT RING BALK 10/15 (202 Kg Besi + Bekesting)DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CMBAHAN :Bekesting Albasiah 0.4800 m³ 2,009,100.00 964,368.00 Paku 5 - 7 cm 1.5000 kg 16,400.00 24,600.00 Pelumas Bekesting 0.4000 lt 36,600.00 14,640.00 Besi Beton Polos U 24 202.0000 kg 14,500.00 2,929,000.00 Kawat Beton 2.2500 kg 15,500.00 34,875.00 Semen Portland 6.4600 zak 90,900.00 587,214.00 Pasir Beton 0.5200 m³ 136,400.00 70,928.00 Batu Pecah 2/3 0.7800 m³ 272,700.00 212,706.00 Jumlah Bahan 4,838,331.00 UPAH : Tukang Batu 0.3500 org 90,000.00 31,500.00 Tukang Kayu 1.0400 org 90,000.00 93,600.00 Tukang Besi 1.0500 org 90,000.00 94,500.00 Kepala Tukang 0.2450 org 95,000.00 23,275.00 Pekerja 3.0000 org 60,000.00 180,000.00 Mandor 0.1225 org 100,000.00 12,250.00 Jumlah Pekerja 435,125.00 Jumlah Bahan + Pekerja 5,273,456.00 Keuntungan Max. 10 % 527,345.60 Jumlah 5,800,801.60 Dibulatkan 5,800,800.00

A.07.66 1 M3 MEMBUAT BALOK 12/15 (217.7900 Kg Besi + Bekesting)DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CMBAHAN :Bekesting Albasiah 0.5600 m³ 2,009,100.00 1,125,096.00 Paku 5 - 7 cm 1.5000 kg 16,400.00 24,600.00 Pelumas Bekesting 0.4000 lt 36,600.00 14,640.00 Besi Beton Polos U 24 217.7900 kg 14,500.00 3,157,955.00 Kawat Beton 2.2500 kg 15,500.00 34,875.00 Semen Portland 6.4600 zak 90,900.00 587,214.00 Pasir Beton 0.5200 m³ 136,400.00 70,928.00 Batu Pecah 2/3 0.7800 m³ 272,700.00 212,706.00 Jumlah Bahan 5,228,014.00 UPAH : Tukang Batu 0.3500 org 90,000.00 31,500.00 Tukang Kayu 1.0400 org 90,000.00 93,600.00 Tukang Besi 1.0500 org 90,000.00 94,500.00 Kepala Tukang 0.2450 org 95,000.00 23,275.00 Pekerja 3.0000 org 60,000.00 180,000.00 Mandor 0.1225 org 100,000.00 12,250.00 Jumlah Pekerja 435,125.00 Jumlah Bahan + Pekerja 5,663,139.00 Keuntungan Max. 10 % 566,313.90 Jumlah 6,229,452.90 Dibulatkan 6,229,450.00

A.07.67 1 M3 MEMBUAT RING BALK 15/15 (211,5556 Kg Besi + Bekesting)DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 20 CMBAHAN :Bekesting Albasiah 0.3200 m³ 2,009,100.00 642,912.00 Paku 5 - 7 cm 1.5000 kg 16,400.00 24,600.00 Pelumas Bekesting 0.4000 lt 36,600.00 14,640.00 Besi Beton Polos U 24 211.5556 kg 14,500.00 3,067,556.20 Kawat Beton 2.2500 kg 15,500.00 34,875.00 Semen Portland 6.4600 zak 90,900.00 587,214.00 Pasir Beton 0.5200 m³ 136,400.00 70,928.00 Batu Pecah 2/3 0.7800 m³ 272,700.00 212,706.00 Jumlah Bahan 4,655,431.20 UPAH : Tukang Batu 0.3500 org 90,000.00 31,500.00 Tukang Kayu 1.0400 org 90,000.00 93,600.00 Tukang Besi 1.0500 org 90,000.00 94,500.00 Kepala Tukang 0.2450 org 95,000.00 23,275.00 Pekerja 3.0000 org 60,000.00 180,000.00 Mandor 0.1225 org 100,000.00 12,250.00 Jumlah Pekerja 435,125.00 Jumlah Bahan + Pekerja 5,090,556.20 Keuntungan Max. 10 % 509,055.62 Jumlah 5,599,611.82 Dibulatkan 5,599,610.00

Page 71: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 71+29

A.07.68 1 M3 MEMBUAT RING BALK 15/15 (139.550 Kg Besi + Bekesting)DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CMBAHAN :Bekesting Albasiah 0.3200 m³ 2,009,100.00 642,912.00 Paku 5 - 7 cm 1.5000 kg 16,400.00 24,600.00 Pelumas Bekesting 0.4000 lt 36,600.00 14,640.00 Besi Beton Polos U 24 139.5500 kg 14,500.00 2,023,475.00 Kawat Beton 2.2500 kg 15,500.00 34,875.00 Semen Portland 6.4600 zak 90,900.00 587,214.00 Pasir Beton 0.5200 m³ 136,400.00 70,928.00 Batu Pecah 2/3 0.7800 m³ 272,700.00 212,706.00 Jumlah Bahan 3,611,350.00 UPAH : Tukang Batu 0.3500 org 90,000.00 31,500.00 Tukang Kayu 1.0400 org 90,000.00 93,600.00 Tukang Besi 1.0500 org 90,000.00 94,500.00 Kepala Tukang 0.2450 org 95,000.00 23,275.00 Pekerja 3.0000 org 60,000.00 180,000.00 Mandor 0.1225 org 100,000.00 12,250.00 Jumlah Pekerja 435,125.00 Jumlah Bahan + Pekerja 4,046,475.00 Keuntungan Max. 10 % 404,647.50 Jumlah 4,451,122.50 Dibulatkan 4,451,120.00

A.07.69 1 M3 MEMBUAT RING BALK 15/20 (180,8889 Kg Besi + Bekesting)DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CMBAHAN :Bekesting Albasiah 0.3200 m³ 2,009,100.00 642,912.00 Paku 5 - 7 cm 1.5000 kg 16,400.00 24,600.00 Pelumas Bekesting 0.4000 lt 36,600.00 14,640.00 Besi Beton Polos U 24 180.8889 kg 14,500.00 2,622,889.05 Kawat Beton 2.2500 kg 15,500.00 34,875.00 Semen Portland 6.4600 zak 90,900.00 587,214.00 Pasir Beton 0.5200 m³ 136,400.00 70,928.00 Batu Pecah 2/3 0.7800 m³ 272,700.00 212,706.00 Jumlah Bahan 4,210,764.05 UPAH : Tukang Batu 0.3500 org 90,000.00 31,500.00 Tukang Kayu 1.0400 org 90,000.00 93,600.00 Tukang Besi 1.0500 org 90,000.00 94,500.00 Kepala Tukang 0.2450 org 95,000.00 23,275.00 Pekerja 3.0000 org 60,000.00 180,000.00 Mandor 0.1225 org 100,000.00 12,250.00 Jumlah Pekerja 435,125.00 Jumlah Bahan + Pekerja 4,645,889.05 Keuntungan Max. 10 % 464,588.91 Jumlah 5,110,477.96 Dibulatkan 5,110,470.00

A.07.70 1 M3 MEMBUAT RING BALK 15/20 (116,889 Kg Besi + Bekesting)DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CMBAHAN :Bekesting Albasiah 0.3200 m³ 2,009,100.00 642,912.00 Paku 5 - 7 cm 1.5000 kg 16,400.00 24,600.00 Pelumas Bekesting 0.4000 lt 36,600.00 14,640.00 Besi Beton Polos U 24 116.8890 kg 14,500.00 1,694,890.50 Kawat Beton 2.2500 kg 15,500.00 34,875.00 Semen Portland 6.4600 zak 90,900.00 587,214.00 Pasir Beton 0.5200 m³ 136,400.00 70,928.00 Batu Pecah 2/3 0.7800 m³ 272,700.00 212,706.00 Jumlah Bahan 3,282,765.50 UPAH : Tukang Batu 0.3500 org 90,000.00 31,500.00 Tukang Kayu 1.0400 org 90,000.00 93,600.00 Tukang Besi 1.0500 org 90,000.00 94,500.00 Kepala Tukang 0.2450 org 95,000.00 23,275.00 Pekerja 3.0000 org 60,000.00 180,000.00 Mandor 0.1225 org 100,000.00 12,250.00 Jumlah Pekerja 435,125.00 Jumlah Bahan + Pekerja 3,717,890.50 Keuntungan Max. 10 % 371,789.05 Jumlah 4,089,679.55 Dibulatkan 4,089,670.00

Page 72: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 72+29

A.07.71 1 M3 MEMBUAT RING BALK 15/25 (151,8222 Kg Besi + Bekesting)DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CMBAHAN :Bekesting Albasiah 0.3200 m³ 2,009,100.00 642,912.00 Paku 5 - 7 cm 1.5000 kg 16,400.00 24,600.00 Pelumas Bekesting 0.4000 lt 36,600.00 14,640.00 Besi Beton Polos U 24 151.8222 kg 14,500.00 2,201,421.90 Kawat Beton 2.2500 kg 15,500.00 34,875.00 Semen Portland 6.4600 zak 90,900.00 587,214.00 Pasir Beton 0.5200 m³ 136,400.00 70,928.00 Batu Pecah 2/3 0.7800 m³ 272,700.00 212,706.00 Jumlah Bahan 3,789,296.90 UPAH : Tukang Batu 0.3500 org 90,000.00 31,500.00 Tukang Kayu 1.0400 org 90,000.00 93,600.00 Tukang Besi 1.0500 org 90,000.00 94,500.00 Kepala Tukang 0.2450 org 95,000.00 23,275.00 Pekerja 3.0000 org 60,000.00 180,000.00 Mandor 0.1225 org 100,000.00 12,250.00 Jumlah Pekerja 435,125.00 Jumlah Bahan + Pekerja 4,224,421.90 Keuntungan Max. 10 % 422,442.19 Jumlah 4,646,864.09 Dibulatkan 4,646,860.00

A.07.72 1 M3 MEMBUAT RING BALK 15/25 ( 97.423 Kg Besi + Bekesting)DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CMBAHAN :Bekesting Albasiah 0.3200 m³ 2,009,100.00 642,912.00 Paku 5 - 7 cm 1.5000 kg 16,400.00 24,600.00 Pelumas Bekesting 0.4000 lt 36,600.00 14,640.00 Besi Beton Polos U 24 97.4230 kg 14,500.00 1,412,633.50 Kawat Beton 2.2500 kg 15,500.00 34,875.00 Semen Portland 6.4600 zak 90,900.00 587,214.00 Pasir Beton 0.5200 m³ 136,400.00 70,928.00 Batu Pecah 2/3 0.7800 m³ 272,700.00 212,706.00 Jumlah Bahan 3,000,508.50 UPAH : Tukang Batu 0.3500 org 90,000.00 31,500.00 Tukang Kayu 1.0400 org 90,000.00 93,600.00 Tukang Besi 1.0500 org 90,000.00 94,500.00 Kepala Tukang 0.2450 org 95,000.00 23,275.00 Pekerja 3.0000 org 60,000.00 180,000.00 Mandor 0.1225 org 100,000.00 12,250.00 Jumlah Pekerja 435,125.00 Jumlah Bahan + Pekerja 3,435,633.50 Keuntungan Max. 10 % 343,563.35 Jumlah 3,779,196.85 Dibulatkan 3,779,190.00

A.07.73 1 M3 MEMBUAT RING BALK 15/25 (175,5556 Kg Besi + Bekesting)DENGAN TULANGAN 5 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CMBAHAN :Bekesting Albasiah 0.3200 m³ 2,009,100.00 642,912.00 Paku 5 - 7 cm 1.5000 kg 16,400.00 24,600.00 Pelumas Bekesting 0.4000 lt 36,600.00 14,640.00 Besi Beton Polos U 24 175.5556 kg 14,500.00 2,545,556.20 Kawat Beton 2.2500 kg 15,500.00 34,875.00 Semen Portland 6.4600 zak 90,900.00 587,214.00 Pasir Beton 0.5200 m³ 136,400.00 70,928.00 Batu Pecah 2/3 0.7800 m³ 272,700.00 212,706.00 Jumlah Bahan 4,133,431.20 UPAH : Tukang Batu 0.3500 org 90,000.00 31,500.00 Tukang Kayu 1.0400 org 90,000.00 93,600.00 Tukang Besi 1.0500 org 90,000.00 94,500.00 Kepala Tukang 0.2450 org 95,000.00 23,275.00 Pekerja 3.0000 org 60,000.00 180,000.00 Mandor 0.1225 org 100,000.00 12,250.00 Jumlah Pekerja 435,125.00 Jumlah Bahan + Pekerja 4,568,556.20 Keuntungan Max. 10 % 456,855.62 Jumlah 5,025,411.82 Dibulatkan 5,025,410.00

Page 73: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 73+29

A.07.74 1 M2 PASANGAN LANTAI BATU SIKATBAHAN :Batu sikat 0,5 / 2 cm 1.0000 m² 40,000.00 40,000.00 P.C (50 kg) + Campuran khusus 0.2600 zak 1,800.00 468.00 Pasir pasang 0.0300 m³ 118,200.00 3,546.00 Jumlah Bahan 44,014.00 UPAH : Pekerja 0.5000 org 60,000.00 30,000.00 Tk. batu 1.5000 org 75,000.00 112,500.00 Kep. Tukang batu 0.1000 org 95,000.00 9,500.00 Mandor 0.0250 org 100,000.00 2,500.00 Jumlah Pekerja 154,500.00 Jumlah Bahan + Pekerja 198,514.00 Keuntungan Max. 10 % 19,851.40 Jumlah 218,365.40 Dibulatkan 218,360.00

A.07.75 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 1 LAPIS DIA.10 JARAK 10 cm TEBAL 10 cmBAHAN :Semen Portland 232.0000 kg 1,800.00 417,600.00 Pasir Beton 0.5200 lbr 136,400.00 70,928.00 Batu Pecah Mesin 2/3 0.7800 M3 272,700.00 212,706.00 Besi Beton (Polos / ulir) 137.3610 Kg 14,500.00 1,991,734.50 Kawat Beton 1.9623 Kg 15,500.00 30,415.65 Kayu Terentang Albasiah, Papan 0.2450 m³ 2,009,100.00 492,229.50 Paku Biasa 2" - 5" 0.1500 kg 16,400.00 2,460.00 Minyak Bekisting 1.4000 Ltr 36,600.00 51,240.00 Kayu Balok Albasiah 0.0700 m³ 2,000,000.00 140,000.00 Jumlah Bahan 3,409,313.65 UPAH :Pekerja 6.4697 Oh 60,000.00 388,184.40 Tukang Batu 0.2500 Oh 75,000.00 18,750.00 Tukang Kayu 4.0260 Oh 75,000.00 301,950.00 Tukang Besi 1.0073 Oh 75,000.00 75,548.55 Kepala Tukang 0.5192 Oh 95,000.00 49,321.53 Mandor 0.1924 Oh 100,000.00 19,244.60 Jumlah Pekerja 852,999.08 Jumlah Bahan + Pekerja 4,262,312.73 Keuntungan Max. 10 % 426,231.27 Jumlah Total 4,688,544.00 Dibulatkan 4,688,540.00

A.07.76 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 1 LAPIS DIA.12 JARAK 10 cm TEBAL 10 cmBAHAN :Semen Portland 232.0000 kg 1,800.00 417,600.00 Pasir Beton 0.5200 lbr 136,400.00 70,928.00 Batu Pecah Mesin 2/3 0.7800 M3 272,700.00 212,706.00 Besi Beton (Polos / ulir) 197.1795 Kg 14,500.00 2,859,102.75 Kawat Beton 2.8168 Kg 15,500.00 43,661.17 Kayu Terentang Albasiah, Papan 0.2450 m³ 2,009,100.00 492,229.50 Paku Biasa 2" - 5" 0.1500 kg 16,400.00 2,460.00 Minyak Bekisting 1.4000 Ltr 36,600.00 51,240.00 Kayu Balok Albasiah 0.0700 m³ 2,000,000.00 140,000.00 Jumlah Bahan 4,289,927.43 UPAH :Pekerja 6.4697 Oh 60,000.00 388,184.40 Tukang Batu 0.2500 Oh 75,000.00 18,750.00 Tukang Kayu 4.0260 Oh 75,000.00 301,950.00 Tukang Besi 1.0073 Oh 75,000.00 75,548.55 Kepala Tukang 0.5192 Oh 95,000.00 49,321.53 Mandor 0.1924 Oh 100,000.00 19,244.60 Jumlah Pekerja 852,999.08 Jumlah Bahan + Pekerja 5,142,926.51 Keuntungan Max. 10 % 514,292.65 Jumlah Total 5,657,219.16 Dibulatkan 5,657,210.00

Page 74: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 74+29

A.07.77 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 1 LAPIS DIA.12 JARAK 10 cm TEBAL 12 cmBAHAN :Semen Portland 232.0000 kg 1,800.00 417,600.00 Pasir Beton 0.5200 lbr 136,400.00 70,928.00 Batu Pecah Mesin 2/3 0.7800 M3 272,700.00 212,706.00 Besi Beton (Polos / ulir) 164.1262 Kg 14,500.00 2,379,830.41 Kawat Beton 2.3447 Kg 15,500.00 36,342.24 Kayu Terentang Albasiah, Papan 0.2450 m³ 2,009,100.00 492,229.50 Paku Biasa 2" - 5" 0.1500 kg 16,400.00 2,460.00 Minyak Bekisting 1.4000 Ltr 36,600.00 51,240.00 Kayu Balok Albasiah 0.0700 m³ 2,000,000.00 140,000.00 Jumlah Bahan 3,803,336.15 UPAH :Pekerja 6.4697 Oh 60,000.00 388,184.40 Tukang Batu 0.2500 Oh 75,000.00 18,750.00 Tukang Kayu 4.0260 Oh 75,000.00 301,950.00 Tukang Besi 1.0073 Oh 75,000.00 75,548.55 Kepala Tukang 0.5192 Oh 95,000.00 49,321.53 Mandor 0.1924 Oh 100,000.00 19,244.60 Jumlah Pekerja 852,999.08 Jumlah Bahan + Pekerja 4,656,335.23 Keuntungan Max. 10 % 465,633.52 Jumlah Total 5,121,968.75 Dibulatkan 5,121,960.00

A.07.78 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 2 LAPIS DIA.12 JARAK 10 cm TEBAL 12 cmBAHAN :Semen Portland 232.0000 kg 1,800.00 417,600.00 Pasir Beton 0.5200 lbr 136,400.00 70,928.00 Batu Pecah Mesin 2/3 0.7800 M3 272,700.00 212,706.00 Besi Beton (Polos / ulir) 349.5591 Kg 14,500.00 5,068,606.52 Kawat Beton 4.9937 Kg 15,500.00 77,402.37 Kayu Terentang Albasiah, Papan 0.2450 m³ 2,009,100.00 492,229.50 Paku Biasa 2" - 5" 0.1500 kg 16,400.00 2,460.00 Minyak Bekisting 1.4000 Ltr 36,600.00 51,240.00 Kayu Balok Albasiah 0.0700 m³ 2,000,000.00 140,000.00 Jumlah Bahan 6,533,172.38 UPAH :Pekerja 6.4697 Oh 60,000.00 388,184.40 Tukang Batu 0.2500 Oh 75,000.00 18,750.00 Tukang Kayu 4.0260 Oh 75,000.00 301,950.00 Tukang Besi 1.0073 Oh 75,000.00 75,548.55 Kepala Tukang 0.5192 Oh 95,000.00 49,321.53 Mandor 0.1924 Oh 100,000.00 19,244.60 Jumlah Pekerja 852,999.08 Jumlah Bahan + Pekerja 7,386,171.46 Keuntungan Max. 10 % 738,617.15 Jumlah Total 8,124,788.61 Dibulatkan 8,124,780.00

A.07.79 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 2 LAPIS DIA.16-17.5CM DAN DIA. 10-12.5 cm TEBAL 20 cmBAHAN :Semen Portland 232.0000 kg 1,800.00 417,600.00 Pasir Beton 0.5200 lbr 136,400.00 70,928.00 Batu Pecah Mesin 2/3 0.7800 M3 272,700.00 212,706.00 Besi Beton (Polos / ulir) 176.4000 Kg 14,500.00 2,557,800.00 Kawat Beton 2.5200 Kg 15,500.00 39,060.00 Kayu Terentang Albasiah, Papan 0.2450 m³ 2,009,100.00 492,229.50 Paku Biasa 2" - 5" 0.1500 kg 16,400.00 2,460.00 Minyak Bekisting 1.4000 Ltr 36,600.00 51,240.00 Kayu Balok Albasiah 0.0700 m³ 2,000,000.00 140,000.00 Jumlah Bahan 3,984,023.50 UPAH :Pekerja 5.1940 Oh 60,000.00 311,640.00 Tukang Batu 0.2500 Oh 75,000.00 18,750.00 Tukang Kayu 2.4420 Oh 75,000.00 183,150.00 Tukang Besi 1.2936 Oh 75,000.00 97,020.00 Kepala Tukang 0.3868 Oh 95,000.00 36,746.00 Mandor 0.1748 Oh 100,000.00 17,480.00 Jumlah Pekerja 664,786.00 Jumlah Bahan + Pekerja 4,648,809.50 Keuntungan Max. 10 % 464,880.95 Jumlah Total 5,113,690.45 Dibulatkan 5,113,690.00

Page 75: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 75+29

A.08.02 1 M2 PASANG ATAP GENTENG PALENTONG BAHAN :Genteng Palentong 25.0000 buah 2,200.00 55,000.00 Jumlah Bahan 55,000.00 UPAH :Pekerja 0.1500 Oh 60,000.00 9,000.00 Tukang Kayu 0.0750 Oh 75,000.00 5,625.00 Kepala Tukang 0.0080 Oh 95,000.00 760.00 Mandor 0.0050 Oh 100,000.00 500.00 Jumlah Pekerja 15,885.00 Jumlah Bahan + Pekerja 70,885.00 Keuntungan Max. 10 % 7,088.50 Jumlah Total 77,973.50 Dibulatkan 77,970.00

A.08.03 1 M2 PASANG ATAP GENTENG MORANDO NATURAL (18 BH)BAHAN :Genteng Morando Natural 18.0000 buah 3,000.00 54,000.00 Jumlah Bahan 54,000.00 UPAH :Pekerja 0.1500 Oh 60,000.00 9,000.00 Tukang Kayu 0.0600 Oh 75,000.00 4,500.00 Kepala Tukang 0.0060 Oh 95,000.00 570.00 Mandor 0.0050 Oh 100,000.00 500.00 Jumlah Pekerja 14,570.00 Jumlah Bahan + Pekerja 68,570.00 Keuntungan Max. 10 % 6,857.00 Jumlah Total 75,427.00 Dibulatkan 75,420.00

A.08.05 1 M2 PASANG BUBUNG GENTENG PALENTONGBAHAN :Genteng Bubung Palentong 5.0000 buah 2,900.00 14,500.00 Semen Portland 8.0000 kg 1,800.00 14,400.00 Pasir Pasang 0.0320 buah 118,200.00 3,782.40 Jumlah Bahan 32,682.40 UPAH :Pekerja 0.4000 Oh 60,000.00 24,000.00 Tukang Kayu 0.2000 Oh 75,000.00 15,000.00 Kepala Tukang 0.0200 Oh 95,000.00 1,900.00 Mandor 0.0020 Oh 100,000.00 200.00 Jumlah Pekerja 41,100.00 Jumlah Bahan + Pekerja 73,782.40 Keuntungan Max. 10 % 7,378.24 Jumlah Total 81,160.64 Dibulatkan 81,160.00

A.08.06 1 M2 PASANG BUBUNG GENTENG MORANDO NATURALBAHAN :Genteng Bubung Morando Natural 4.0000 buah 5,100.00 20,400.00 Semen Portland 8.0000 kg 1,800.00 14,400.00 Pasir Pasang 0.0320 buah 118,200.00 3,782.40 Jumlah Bahan 38,582.40 UPAH :Pekerja 0.4000 Oh 60,000.00 24,000.00 Tukang Kayu 0.2000 Oh 75,000.00 15,000.00 Kepala Tukang 0.0200 Oh 95,000.00 1,900.00 Mandor 0.0020 Oh 100,000.00 200.00 Jumlah Pekerja 41,100.00 Jumlah Bahan + Pekerja 79,682.40 Keuntungan Max. 10 % 7,968.24 Jumlah Total 87,650.64 Dibulatkan 87,650.00

A.08.11 1 M2 PASANG ATAP ASBES GELOMBANG (1,80 x 0,90m) x 5 mmBAHAN :Asbes Gelombang 0.6200 lbr 124,900.00 77,438.00 Paku Pancing 60 x 230 0.1200 kg 22,700.00 2,724.00 Jumlah Bahan 80,162.00 UPAH :Pekerja 0.1400 Oh 60,000.00 8,400.00 Tukang Kayu 0.0700 Oh 75,000.00 5,250.00 Kepala Tukang 0.0070 Oh 95,000.00 665.00 Mandor 0.0035 Oh 100,000.00 350.00 Jumlah Pekerja 14,665.00 Jumlah Bahan + Pekerja 94,827.00 Keuntungan Max. 10 % 9,482.70 Jumlah Total 104,309.70 Dibulatkan 104,300.00

A.08.12 1 M2 PASANG ATAP ASBES GELOMBANG (0,80 x 1,80m) x 5 mm

Page 76: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 76+29

BAHAN :Asbes Gelombang 0.6200 lbr 83,600.00 51,832.00 Paku Pancing 0.1200 kg 22,700.00 2,724.00 Jumlah Bahan 54,556.00 UPAH :Pekerja 0.1400 Oh 60,000.00 8,400.00 Tukang Kayu 0.0700 Oh 75,000.00 5,250.00 Kepala Tukang 0.0070 Oh 95,000.00 665.00 Mandor 0.0035 Oh 100,000.00 350.00 Jumlah Pekerja 14,665.00 Jumlah Bahan + Pekerja 69,221.00 Keuntungan Max. 10 % 6,922.10 Jumlah Total 76,143.10 Dibulatkan 76,140.00

A.08.13 1 M2 PASANG ATAP ASBES GELOMBANG (0,90m x 1,80m) x 4 mmBAHAN :Asbes Gelombang 0.6200 lbr 72,700.00 45,074.00 Paku Pancing 0.1200 kg 22,700.00 2,724.00 Jumlah Bahan 47,798.00 UPAH :Pekerja 0.1400 Oh 60,000.00 8,400.00 Tukang Kayu 0.0700 Oh 75,000.00 5,250.00 Kepala Tukang 0.0070 Oh 95,000.00 665.00 Mandor 0.0070 Oh 100,000.00 700.00 Jumlah Pekerja 15,015.00 Jumlah Bahan + Pekerja 62,813.00 Keuntungan Max. 10 % 6,281.30 Jumlah Total 69,094.30 Dibulatkan 69,090.00

A.08.14 1 M' PASANG NOK ASBES GELOMBANG , 4 mmBAHAN :Asbes Gelombang 1.1000 bh 40,000.00 44,000.00 Paku Pancing 0.0240 kg 22,700.00 544.80 Jumlah Bahan 44,544.80 UPAH :Pekerja 0.0160 Oh 60,000.00 960.00 Tukang Kayu 0.0800 Oh 75,000.00 6,000.00 Kepala Tukang 0.0080 Oh 95,000.00 760.00 Mandor 0.0040 Oh 100,000.00 400.00 Jumlah Pekerja 8,120.00 Jumlah Bahan + Pekerja 52,664.80 Keuntungan Max. 10 % 5,266.48 Jumlah Total 57,931.28 Dibulatkan 57,930.00

A.08.30 1 M2 PASANG ATAP GENTENG BETONBAHAN :Genteng Beton 11.0000 bh 6,000.00 66,000.00 Paku Biasa 2" - 5" 0.0300 bh 16,400.00 492.00 Jumlah Bahan 66,492.00 UPAH :Pekerja 0.2000 Oh 60,000.00 12,000.00 Tukang Kayu 0.1000 Oh 75,000.00 7,500.00 Kepala Tukang 0.0100 Oh 95,000.00 950.00 Mandor 0.0010 Oh 100,000.00 100.00 Jumlah Pekerja 20,550.00 Jumlah Bahan + Pekerja 87,042.00 Keuntungan Max. 10 % 8,704.20 Jumlah Total 95,746.20 Dibulatkan 95,740.00

A.09.02 1 M2 LANGIT - LANGIT ETERNIT (1,00 x 1,00) m , TEBAL 4 mmBAHAN :Eternit 1.1000 lbr 15,400.00 16,940.00 Paku 0.0100 kg 16,400.00 164.00 Jumlah Bahan 17,104.00 UPAH :Pekerja 0.0300 Oh 60,000.00 1,800.00 Tukang Kayu 0.0700 Oh 75,000.00 5,250.00 Kepala Tukang 0.0070 Oh 95,000.00 665.00 Mandor 0.0015 Oh 100,000.00 150.00 Jumlah Pekerja 7,865.00 Jumlah Bahan + Pekerja 24,969.00 Keuntungan Max. 10 % 2,496.90 Jumlah Total 27,465.90 Dibulatkan 27,460.00

A.09.24 1 M2 LANGIT - LANGIT GYPSUM BOARD, TEBAL 9 mmBAHAN :

Page 77: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 77+29

Gypsum Board (120 x 240 x9) mm 0.3640 lbr 98,200.00 35,744.80 Paku Sekrup 0.1100 kg 12,300.00 1,353.00 Jumlah Bahan 37,097.80 UPAH :Pekerja 0.1000 Oh 60,000.00 6,000.00 Tukang Kayu 0.0500 Oh 75,000.00 3,750.00 Kepala Tukang 0.0050 Oh 95,000.00 475.00 Mandor 0.0050 Oh 100,000.00 500.00 Jumlah Pekerja 10,725.00 Jumlah Bahan + Pekerja 47,822.80 Keuntungan Max. 10 % 4,782.28 Jumlah Total 52,605.08 Dibulatkan 52,600.00

A.10.01 MEMASANG 1 BUAH KLOSET DUDUK/MONOBLOKBAHAN :Kloset duduk/monoblok 1.0000 bh 1,997,700.00 1,997,700.00

Perlengkapan 0.0600 1,997,700.00 119,862.00

Jumlah Bahan 2,117,562.00 UPAH :Pekerja 2.1000 Oh 60,000.00 126,000.00 Tukang Batu 0.9600 Oh 75,000.00 72,000.00 Kepala Tukang 0.0010 Oh 95,000.00 95.00 Mandor 0.1600 Oh 100,000.00 16,000.00 Jumlah Pekerja 214,095.00

Jumlah Bahan + Pekerja 2,331,657.00 Keuntungan Max. 10 % 233,165.70 Jumlah Total 2,564,822.70 Dibulatkan 2,564,820.00

A.10.02 MEMASANG 1 BUAH KLOSET JONGKOK PORSELENBAHAN :Kloset Jongkok porselen 1.0000 bh 198,500.00 198,500.00 Semen Portland 6.0000 kg 1,800.00 10,800.00 Pasir Pasang 0.0100 m³ 118,200.00 1,182.00 Jumlah Bahan 210,482.00 UPAH :Pekerja 0.6000 Oh 60,000.00 36,000.00 Tukang Batu 0.3000 Oh 75,000.00 22,500.00 Kepala Tukang 0.1500 Oh 95,000.00 14,250.00 Mandor 0.0800 Oh 100,000.00 8,000.00 Jumlah Pekerja 80,750.00

Jumlah Bahan + Pekerja 291,232.00 Keuntungan Max. 10 % 29,123.20 Jumlah Total 320,355.20 Dibulatkan 320,350.00

A.10.04 MEMASANG 1 BUAH URINOIRBAHAN :Urinoir 1.0000 bh 2,320,400.00 2,320,400.00

Perlengkapan 0.3000 2,320,400.00 696,120.00

Semen Portland 6.0000 kg 1,800.00 10,800.00 Pasir Pasang 0.0100 m³ 118,200.00 1,182.00 Jumlah Bahan 3,028,502.00 UPAH :Pekerja 1.0000 Oh 60,000.00 60,000.00 Tukang Batu 0.9000 Oh 75,000.00 67,500.00 Kepala Tukang 0.1000 Oh 95,000.00 9,500.00 Mandor 0.1000 Oh 100,000.00 10,000.00 Jumlah Pekerja 147,000.00

Jumlah Bahan + Pekerja 3,175,502.00 Keuntungan Max. 10 % 317,550.20 Jumlah Total 3,493,052.20 Dibulatkan 3,493,050.00

harga kloset

hrg urinoir

Page 78: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 78+29

A.10.05 MEMASANG 1 BUAH WASTAFELBAHAN :Wastafel 1.0000 bh 930,500.00 930,500.00

Perlengkapan 0.1200 930,500.00 111,660.00

Semen Abu-abu 6.0000 kg 1,800.00 10,800.00 Pasir Pasang 0.0100 m³ 118,200.00 1,182.00 Jumlah Bahan 1,054,142.00 UPAH :Pekerja 1.2000 Oh 60,000.00 72,000.00 Tukang Batu 1.4500 Oh 75,000.00 108,750.00 Kepala Tukang 0.1500 Oh 95,000.00 14,250.00 Mandor 0.1000 Oh 100,000.00 10,000.00 Jumlah Pekerja 205,000.00

Jumlah Bahan + Pekerja 1,259,142.00 Keuntungan Max. 10 % 125,914.20 Jumlah Total 1,385,056.20 Dibulatkan 1,385,050.00

A.10.06 MEMASANG 1 BUAH BAK MANDI TRASO VOLUME 0,3 M3BAHAN :Bak Teraso 1.0000 bh 370,900.00 370,900.00 Semen Portland 6.0000 kg 1,800.00 10,800.00 Pasir Pasang 0.0100 m³ 118,200.00 1,182.00 Jumlah Bahan 382,882.00 UPAH :Pekerja 2.1000 Oh 60,000.00 126,000.00 Tukang Batu 0.7500 Oh 75,000.00 56,250.00 Kepala Tukang 0.0700 Oh 95,000.00 6,650.00 Mandor 0.1100 Oh 100,000.00 11,000.00 Jumlah Pekerja 199,900.00

Jumlah Bahan + Pekerja 582,782.00 Keuntungan Max. 10 % 58,278.20 Jumlah Total 641,060.20 Dibulatkan 641,060.00

A.10.07 MEMASANG 1 BUAH BAK MANDI FIBREGLASS VOLUME 0,3 M3BAHAN :Bak Fibreglass 1.0000 bh 173,600.00 173,600.00 Perlengkapan 0.1800 hrg bak 173,600.00 31,248.00 Jumlah Bahan 204,848.00 UPAH :Pekerja 1.8000 Oh 60,000.00 108,000.00 Tukang Batu 0.6000 Oh 75,000.00 45,000.00 Kepala Tukang 0.5400 Oh 95,000.00 51,300.00 Mandor 0.1100 Oh 100,000.00 11,000.00 Jumlah Pekerja 215,300.00

Jumlah Bahan + Pekerja 420,148.00 Keuntungan Max. 10 % 42,014.80 Jumlah Total 462,162.80 Dibulatkan 462,160.00

A.10.08 MEMASANG 1 BUAH BAK MANDI BATU BATA VOLUME 0,3 M3BAHAN :Batu Bata 110.0000 bh 400.00 44,000.00 Semen Portland 80.0000 kg 1,800.00 144,000.00 Pasir Pasang 0.3000 m³ 118,200.00 35,460.00 Porselen (11x11)cm 216.0000 bh 763.46 164,907.44 Semen nat 6.0000 kg 9,100.00 54,600.00 Jumlah Bahan 442,967.44 UPAH :Pekerja 2.0000 Oh 60,000.00 120,000.00 Tukang Batu 1.0000 Oh 75,000.00 75,000.00 Kepala Tukang 0.3000 Oh 95,000.00 28,500.00 Mandor 0.1500 Oh 100,000.00 15,000.00 Jumlah Pekerja 238,500.00

Jumlah Bahan + Pekerja 681,467.44 Keuntungan Max. 10 % 68,146.74 Jumlah Total 749,614.19 Dibulatkan 749,610.00

hrg kloset

Page 79: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 79+29

A.10.09 MEMASANG 1 BUAH BADKIP PORSELENBAHAN :Badkip 1.0000 m³ 2,970,500.00 2,970,500.00

Perlengkapan 0.2000 2,970,500.00 594,100.00

Jumlah Bahan 3,564,600.00 UPAH :Pekerja - Oh 60,000.00 - Tukang Batu 0.0750 Oh 75,000.00 5,625.00 Kepala Tukang 0.7500 Oh 95,000.00 71,250.00 Mandor 0.2500 Oh 100,000.00 25,000.00 Jumlah Pekerja 101,875.00

Jumlah Bahan + Pekerja 3,666,475.00 Keuntungan Max. 10 % 366,647.50 Jumlah Total 4,033,122.50 Dibulatkan 4,033,120.00

A.10.16 MEMASANG 1 BUAH BAK KONTROL PASANGAN BATU BATA UKURAN (30X30) TINGGI 35 CMBAHAN :Batu Bata 0.1450 bh 400.00 58.00 Semen Portland 44.0000 kg 1,800.00 79,200.00 Pasir Pasang 0.0700 m3 118,200.00 8,274.00 Batu Kerikil 0.0700 m3 272,700.00 19,089.00 Besi beton 1.6000 kg 14,500.00 23,200.00 Pasir Beton 0.0600 m3 136,400.00 8,184.00 Jumlah Bahan 138,005.00 UPAH :Pekerja 3.2000 Oh 60,000.00 192,000.00 Tukang Batu 1.0150 Oh 75,000.00 76,125.00 Kepala Tukang 0.0015 Oh 95,000.00 142.50 Mandor 0.0160 Oh 100,000.00 1,600.00 Jumlah Pekerja 269,867.50

Jumlah Bahan + Pekerja 407,872.50 Keuntungan Max. 10 % 40,787.25 Jumlah Total 448,659.75 Dibulatkan 448,650.00

A.10.17 MEMASANG 1 BUAH BAK KONTROL PASANGAN BATU BATA UKURAN (45X45) TINGGI 50 CMBAHAN :Batu Bata 0.2500 m3 400.00 100.00 Semen Portland 77.0000 kg 1,800.00 138,600.00 Pasir Pasang 0.1300 m3 118,200.00 15,366.00 Batu Kerikil 0.0200 m3 272,700.00 5,454.00 Besi beton 2.6000 kg 16,400.00 42,640.00 Pasir Beton 0.0900 m3 136,400.00 12,276.00 Jumlah Bahan 214,436.00 UPAH :Pekerja 1.4200 Oh 60,000.00 85,200.00 Tukang Batu 0.4730 Oh 75,000.00 35,475.00 Kepala Tukang 0.0470 Oh 95,000.00 4,465.00 Mandor 0.0710 Oh 100,000.00 7,100.00 Jumlah Pekerja 132,240.00

Jumlah Bahan + Pekerja 346,676.00 Keuntungan Max. 10 % 34,667.60 Jumlah Total 381,343.60 Dibulatkan - 381,340.00

A.10.18 MEMASANG 1 BUAH BAK KONTROL PASANGAN BATU BATA UKURAN (60X60) TINGGI 65 CMBAHAN :Batu Bata 0.3710 m3 400.00 148.40 Semen Portland 114.0000 kg 1,800.00 205,200.00 Pasir Pasang 0.1840 m3 118,200.00 21,748.80 Batu Kerikil 0.0330 m3 272,700.00 8,999.10 Besi beton 4.8500 kg 14,500.00 70,325.00 Pasir Beton 0.1200 m3 136,400.00 16,368.00 Jumlah Bahan 322,789.30 UPAH :Pekerja 2.1600 Oh 60,000.00 129,600.00 Tukang Gali 0.1000 Oh 70,000.00 7,000.00 Tukang Batu 0.7200 Oh 75,000.00 54,000.00 Kepala Tukang 0.0720 Oh 95,000.00 6,840.00 Mandor 0.1080 Oh 100,000.00 10,800.00 Jumlah Pekerja 208,240.00

Jumlah Bahan + Pekerja 531,029.30 Keuntungan Max. 10 % 53,102.93 Jumlah Total 584,132.23 Dibulatkan 584,130.00

hrg badkip

Page 80: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 80+29

A.10.19 MEMASANG 1 M' PIPA GALVANIS DIAMETER 0,5"BAHAN :Pipa Galvanis 1.2000 m' 21,216.67 25,460.00 Perlengkapan 0.3500 hrg pipa 21,216.67 7,425.83 Jumlah Bahan 32,885.83 UPAH :Pekerja 0.0540 Oh 60,000.00 3,240.00 Tukang Batu 0.0900 Oh 75,000.00 6,750.00 Kepala Tukang 0.0090 Oh 95,000.00 855.00 Mandor 0.0270 Oh 100,000.00 2,700.00 Jumlah Pekerja 13,545.00

Jumlah Bahan + Pekerja 46,430.83 Keuntungan Max. 10 % 4,643.08 Jumlah Total 51,073.92 Dibulatkan 51,070.00

A.10.20 MEMASANG 1 M' PIPA GALVANIS DIAMETER 0,75"BAHAN :Pipa Galvanis 1.2000 m' 25,850.00 31,020.00 Perlengkapan 0.3500 hrg pipa 25,850.00 9,047.50 Jumlah Bahan 40,067.50 UPAH :Pekerja 0.0540 Oh 60,000.00 3,240.00 Tukang Batu 0.0900 Oh 75,000.00 6,750.00 Kepala Tukang 0.0090 Oh 95,000.00 855.00 Mandor 0.0270 Oh 100,000.00 2,700.00 Jumlah Pekerja 13,545.00

Jumlah Bahan + Pekerja 53,612.50 Keuntungan Max. 10 % 5,361.25 Jumlah Total 58,973.75 Dibulatkan 58,970.00

A.10.21 MEMASANG 1 M' PIPA GALVANIS DIAMETER 1"BAHAN :Pipa Galvanis 1.2000 1,2 m' 38,416.67 46,100.00 Perlengkapan 0.3500 hrg pipa 38,416.67 13,445.83 Jumlah Bahan 59,545.83 UPAH :Pekerja 0.0540 Oh 60,000.00 3,240.00 Tukang Batu 0.0900 Oh 75,000.00 6,750.00 Kepala Tukang 0.0090 Oh 95,000.00 855.00 Mandor 0.0270 Oh 100,000.00 2,700.00 Jumlah Pekerja 13,545.00

Jumlah Bahan + Pekerja 73,090.83 Keuntungan Max. 10 % 7,309.08 Jumlah Total 80,399.92 Dibulatkan 80,390.00

A.10.22 MEMASANG 1 M' PIPA GALVANIS DIAMETER 1,5"BAHAN :Pipa Galvanis 1.2000 1,2 m' 59,450.00 71,340.00 Perlengkapan 0.3500 hrg pipa 59,450.00 20,807.50 Jumlah Bahan 92,147.50 UPAH :Pekerja 0.1080 Oh 60,000.00 6,480.00 Tukang Batu 0.1800 Oh 75,000.00 13,500.00 Kepala Tukang 0.0180 Oh 95,000.00 1,710.00 Mandor 0.0054 Oh 100,000.00 540.00 Jumlah Pekerja 22,230.00

Jumlah Bahan + Pekerja 114,377.50 Keuntungan Max. 10 % 11,437.75 Jumlah Total 125,815.25 Dibulatkan 125,810.00

A.10.23 MEMASANG 1 M' PIPA GALVANIS DIAMETER 3"BAHAN :Pipa Galvanis 1.2000 1,2 m' 140,600.00 168,720.00 Perlengkapan 0.3500 hrg pipa 140,600.00 49,210.00 Jumlah Bahan 217,930.00 UPAH :Pekerja 0.1080 Oh 60,000.00 6,480.00 Tukang Batu 0.1800 Oh 75,000.00 13,500.00 Kepala Tukang 0.0180 Oh 95,000.00 1,710.00 Mandor 0.0054 Oh 100,000.00 540.00 Jumlah Pekerja 22,230.00

Jumlah Bahan + Pekerja 240,160.00 Keuntungan Max. 10 % 24,016.00 Jumlah Total 264,176.00 Dibulatkan 264,170.00

A.10.24 MEMASANG 1 M' PIPA GALVANIS DIAMETER 4"

Page 81: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 81+29

BAHAN :Pipa Galvanis 1.2000 1,2 m' 185,300.00 222,360.00 Perlengkapan 0.3500 hrg pipa 185,300.00 64,855.00 Jumlah Bahan 287,215.00 UPAH :Pekerja 0.1350 Oh 60,000.00 8,100.00 Tukang Batu 0.2250 Oh 75,000.00 16,875.00 Kepala Tukang 0.0225 Oh 95,000.00 2,137.50 Mandor 0.0068 Oh 100,000.00 680.00 Jumlah Pekerja 27,792.50

Jumlah Bahan + Pekerja 315,007.50 Keuntungan Max. 10 % 31,500.75 Jumlah Total 346,508.25 Dibulatkan 346,500.00

A.10.25 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 0,5"BAHAN :Pipa PVC 1.2000 m' 9,900.00 11,880.00 Perlengkapan 0.3500 hrg pipa 9,900.00 3,465.00 Jumlah Bahan 15,345.00 UPAH :Pekerja 0.0360 Oh 60,000.00 2,160.00 Tukang Batu 0.0600 Oh 75,000.00 4,500.00 Kepala Tukang 0.0060 Oh 95,000.00 570.00 Mandor 0.0018 Oh 100,000.00 180.00 Jumlah Pekerja 7,410.00

Jumlah Bahan + Pekerja 22,755.00 Keuntungan Max. 10 % 2,275.50 Jumlah Total 25,030.50 Dibulatkan 25,030.00

A.10.26 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 0,75"BAHAN :Pipa PVC 1.2000 m' 13,950.00 16,740.00 Perlengkapan 0.3500 hrg pipa 13,950.00 4,882.50 Jumlah Bahan 21,622.50 UPAH :Pekerja 0.0360 Oh 60,000.00 2,160.00 Tukang Batu 0.0600 Oh 75,000.00 4,500.00 Kepala Tukang 0.0060 Oh 95,000.00 570.00 Mandor 0.0018 Oh 100,000.00 180.00 Jumlah Pekerja 7,410.00

Jumlah Bahan + Pekerja 29,032.50 Keuntungan Max. 10 % 2,903.25 Jumlah Total 31,935.75 Dibulatkan 31,930.00

A.10.27 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 1"BAHAN :Pipa PVC 1.2000 m' 17,375.00 20,850.00 Perlengkapan 0.3500 hrg pipa 17,375.00 6,081.25 Jumlah Bahan 26,931.25 UPAH :Pekerja 0.0360 Oh 60,000.00 2,160.00 Tukang Batu 0.0600 Oh 75,000.00 4,500.00 Kepala Tukang 0.0060 Oh 95,000.00 570.00 Mandor 0.0018 Oh 100,000.00 180.00 Jumlah Pekerja 7,410.00

Jumlah Bahan + Pekerja 34,341.25 Keuntungan Max. 10 % 3,434.13 Jumlah Total 37,775.38 Dibulatkan 37,770.00

A.10.28 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 1,5"BAHAN :Pipa PVC 1.2000 m' 31,275.00 37,530.00 Perlengkapan 0.3500 hrg pipa 31,275.00 10,946.25 Jumlah Bahan 48,476.25 UPAH :Pekerja 0.0360 Oh 60,000.00 2,160.00 Tukang Batu 0.0600 Oh 75,000.00 4,500.00 Kepala Tukang 0.0060 Oh 95,000.00 570.00 Mandor 0.0018 Oh 100,000.00 180.00 Jumlah Pekerja 7,410.00

Jumlah Bahan + Pekerja 55,886.25 Keuntungan Max. 10 % 5,588.63 Jumlah Total 61,474.88 Dibulatkan 61,470.00

A.10.29 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 2"BAHAN :

Page 82: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 82+29

Pipa PVC 1.2000 m' 42,775.00 51,330.00 Perlengkapan 0.3500 hrg pipa 42,775.00 14,971.25 Jumlah Bahan 66,301.25 UPAH :Pekerja 0.0540 Oh 60,000.00 3,240.00 Tukang Batu 0.0900 Oh 75,000.00 6,750.00 Kepala Tukang 0.0090 Oh 95,000.00 855.00 Mandor 0.0027 Oh 100,000.00 270.00 Jumlah Pekerja 11,115.00

Jumlah Bahan + Pekerja 77,416.25 Keuntungan Max. 10 % 7,741.63 Jumlah Total 85,157.88 Dibulatkan 85,150.00

A.10.30 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 2,5"BAHAN :Pipa PVC 1.2000 m' 54,550.00 65,460.00 Perlengkapan 0.3500 hrg pipa 54,550.00 19,092.50 Jumlah Bahan 84,552.50 UPAH :Pekerja 0.0360 Oh 60,000.00 2,160.00 Tukang Batu 0.0600 Oh 75,000.00 4,500.00 Kepala Tukang 0.0060 Oh 95,000.00 570.00 Mandor 0.0018 Oh 100,000.00 180.00 Jumlah Pekerja 7,410.00

Jumlah Bahan + Pekerja 91,962.50 Keuntungan Max. 10 % 9,196.25 Jumlah Total 101,158.75 Dibulatkan 101,150.00

A.10.31 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 3"BAHAN :Pipa PVC 1.2000 m' 81,900.00 98,280.00 Perlengkapan 0.3500 hrg pipa 81,900.00 28,665.00 Jumlah Bahan 126,945.00 UPAH :Pekerja 0.0810 Oh 60,000.00 4,860.00 Tukang Batu 0.1350 Oh 75,000.00 10,125.00 Kepala Tukang 0.0135 Oh 95,000.00 1,282.50 Mandor 0.0041 Oh 100,000.00 410.00 Jumlah Pekerja 16,677.50

Jumlah Bahan + Pekerja 143,622.50 Keuntungan Max. 10 % 14,362.25 Jumlah Total 157,984.75 Dibulatkan 157,980.00

A.10.32 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 4"BAHAN :Pipa PVC 1.2000 m' 127,150.00 152,580.00 Perlengkapan 0.3500 hrg pipa 127,150.00 44,502.50 Jumlah Bahan 197,082.50 UPAH :Pekerja 0.0810 Oh 60,000.00 4,860.00 Tukang Batu 0.1350 Oh 75,000.00 10,125.00 Kepala Tukang 0.0135 Oh 95,000.00 1,282.50 Mandor 0.0041 Oh 100,000.00 410.00 Jumlah Pekerja 16,677.50

Jumlah Bahan + Pekerja 213,760.00 Keuntungan Max. 10 % 21,376.00 Jumlah Total 235,136.00 Dibulatkan 235,130.00

A.10.33 MEMASANG 1 BH BAK CUCI PIRING STAILES STEELBAHAN :Bak Cuci Stainless Steel 1.0000 bh 290,900.00 290,900.00 Water drain + asesories 1.0000 bh 36,400.00 36,400.00 Jumlah Bahan 327,300.00 UPAH :Pekerja 0.0300 Oh 60,000.00 1,800.00 Tukang Batu 0.3000 Oh 75,000.00 22,500.00 Kepala Tukang 0.0300 Oh 95,000.00 2,850.00 Mandor 0.0015 Oh 100,000.00 150.00 Jumlah Pekerja 27,300.00

Jumlah Bahan + Pekerja 354,600.00 Keuntungan Max. 10 % 35,460.00 Jumlah Total 390,060.00 Dibulatkan 390,060.00

A.10.35 MEMASANG 1 BH KRAN DIAMETER 0,75' ATAU 0,5"BAHAN :Kran Air 1.0000 bh 37,100.00 37,100.00

Page 83: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 83+29

Seal tape 0.0250 bh 2,400.00 60.00 Jumlah Bahan 37,160.00 UPAH :Pekerja 0.0100 Oh 60,000.00 600.00 Tukang Batu - Oh 75,000.00 - Kepala Tukang 0.0010 Oh 95,000.00 95.00 Mandor 0.0005 Oh 100,000.00 50.00 Jumlah Pekerja 745.00

Jumlah Bahan + Pekerja 37,905.00 Keuntungan Max. 10 % 3,790.50 Jumlah Total 41,695.50 Dibulatkan 41,690.00

A.10.36 MEMASANG 1 BH FLOOR DRAINBAHAN :Floordrain 1.0000 bh 36,400.00 36,400.00

Jumlah Bahan 36,400.00 UPAH :Pekerja 0.0100 Oh 60,000.00 600.00 Tukang Batu - Oh 75,000.00 - Kepala Tukang 0.0010 Oh 95,000.00 95.00 Mandor 0.0005 Oh 100,000.00 50.00 Jumlah Pekerja 745.00

Jumlah Bahan + Pekerja 37,145.00 Keuntungan Max. 10 % 3,714.50 Jumlah Total 40,859.50 Dibulatkan 40,850.00

A.10.37 1 UNIT SEPTICTANK 2,5 X 1,5 X 2M + REMBESANNYA ( KANTOR TYPE BESAR )Galian tanah 7.5000 m³ 36,760.00 275,700.00 Pasir urug 0.3570 m³ 139,000.00 49,623.00 Lantai kerja 3.7500 m³ 828,702.00 3,107,632.50 Pas. bata 1 PC : 2 PS + Plesteran 25.0000 m² 134,336.40 3,358,410.00 Plat beton penutup & balok 0.5000 m³ 5,003,248.00 2,501,624.00 Pipa PVC 4" jenis AW + sambungan 9.0000 m1 62,050.00 558,450.00 Pipa GIP 1/2" 2.0000 m1 21,216.67 42,433.33 Galian tanah untuk rembesan 5.6250 m³ 36,760.00 206,775.00 Pas. injuk 9.0000 kg 36,660.00 329,940.00 Urugan kerikil 3,5 cm 1.7500 m³ 263,600.00 461,300.00 Pipa PVC 4" berlobang jenis AW 6.0000 m1 48,400.00 290,400.00 Urugan kembali perataan tanah 1.8750 m³ 13,420.00 25,162.50 Jumlah 11,207,450.33 Keuntungan Max. 10 % 1,120,745.03 Jumlah 12,328,195.37 Dibulatkan 12,328,190.00

A.10.38 1 UNIT SEPTICTANK 2 X 1,5 X 1,5 M + REMBESANNYA ( KANTOR TYPE KECIL )Galian tanah 4.5000 m³ 36,760.00 165,420.00 Pasir urug 0.2142 m³ 139,000.00 29,773.80 Lantai kerja 2.2500 m³ 828,702.00 1,864,579.50 Pas. bata 1 PC : 2 PS + Plesteran 15.0000 m² 134,336.40 2,015,046.00 Plat beton penutup & balok 0.3000 m³ 5,003,248.00 1,500,974.40 Pipa PVC 4" jenis AW + sambungan 5.4000 m1 62,050.00 335,070.00 Pipa GIP 1/2" 1.2000 btg 21,216.67 25,460.00 Galian tanah untuk rembesan 3.3750 m³ 36,760.00 124,065.00 Pas. injuk 5.4000 kg 36,660.00 197,964.00 Urugan kerikil 3,5 cm 1.0500 m³ 263,600.00 276,780.00 Pipa PVC 4" berlobang jenis AW 9.0000 m1 48,400.00 435,600.00 Urugan kembali perataan tanah 1.1250 m³ 13,420.00 15,097.50 Jumlah 6,985,830.20 Keuntungan Max. 10 % 698,583.02 Jumlah 7,684,413.22 Dibulatkan 7,684,410.00

Page 84: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 84+29

A.10.39 1 UNIT SEPTICTANK 1.5 X 1 X 1,5 M + REMBESANNYA ( RUMAH KAPASITAS KECIL)Galian tanah 2.2500 m³ 36,760.00 82,710.00 Pasir urug 0.1071 m³ 139,000.00 14,886.90 Lantai kerja 1.1250 m³ 828,702.00 932,289.75 Pas. bata 1 PC : 2 PS + Plesteran 7.5000 m² 134,336.40 1,007,523.00 Plat beton penutup & balok 0.1500 m³ 5,003,248.00 750,487.20 Pipa PVC 4" jenis AW + sambungan 9.0000 m1 62,050.00 558,450.00 Pipa GIP1/2" 0.6000 btg 21,216.67 12,730.00 Galian tanah untuk rembesan 1.6875 m³ 36,760.00 62,032.50 Pas. injuk 2.7000 kg 36,660.00 98,982.00 Urugan kerikil 3,5 cm 0.5250 m³ 263,600.00 138,390.00 Pipa PVC 4" berlobang jenis AW 9.0000 m1 48,400.00 435,600.00 Urugan kembali perataan tanah 0.5625 m³ 13,420.00 7,548.75 Jumlah 4,101,630.10 Keuntungan Max. 10 % 410,163.01 Jumlah 4,511,793.11 Dibulatkan 4,511,790.00

A.10.40 1 M1 SALURAN GREFEL BETON 1/2 Q 20 CM + PASANGANGalian Tanah 0.1500 m³ 28,000.00 4,200.00 Grefel Beton 20 Cm X 1/2 1.0000 bh 36,400.00 36,400.00 Pas . Bata + Plesteran 1 : 3 1.0000 m1 126,328.80 126,328.80 Jumlah Bahan 166,928.80 UPAH :Upah kerja 0.1500 ls 166,928.80 25,039.32 Jumlah Pekerja 25,039.32

Jumlah Bahan + Pekerja 191,968.12 Keuntungan Max. 10 % 19,196.81 Jumlah Total 211,164.93 Dibulatkan 211,160.00

A.10.41 1 M1 SALURAN GREFEL BETON 1/2 Q 30 CM + PASANGANGalian Tanah 0.2000 m³ 28,000.00 5,600.00 Grefel Beton 30 Cm X 1/2 1.0000 bh 54,500.00 54,500.00 Pas . Bata + Plesteran 1 : 3 1.0000 m1 126,328.80 126,328.80 Jumlah Bahan 186,428.80 UPAH :Upah Kerja 0.1500 ls 186,428.80 27,964.32 Jumlah Pekerja 27,964.32

Jumlah Bahan + Pekerja 214,393.12 Keuntungan Max. 10 % 21,439.31 Jumlah Total 235,832.43 Dibulatkan 235,830.00

A.11.01 1 KG PASANG RANGKA ATAP BAJABAHAN :Besi Profil WF 1.1000 kg 16,800.00 18,480.00 Meni Besi 0.0800 kg 28,400.00 2,272.00 Jumlah Bahan 20,752.00 UPAH :Pekerja 0.0600 Oh 60,000.00 3,600.00 Tukang Besi 0.0060 Oh 75,000.00 450.00 Kepala Tukang 0.0060 Oh 95,000.00 570.00 Mandor 0.0003 Oh 100,000.00 30.00 Jumlah Pekerja 4,650.00

Jumlah Bahan + Pekerja 25,402.00 Keuntungan Max. 10 % 2,540.20 Jumlah Total 27,942.20 Dibulatkan 27,940.00

A.11.08 1 M2 PASANG ROLLING DOORBAHAN :Roll Door 1.0000 m2 727,300.00 727,300.00 Jumlah Bahan 727,300.00 UPAH :Pekerja 1.0500 Oh 60,000.00 63,000.00 Tukang Besi Konstruksi 1.5000 Oh 75,000.00 112,500.00 Kepala Tukang 0.1050 Oh 95,000.00 9,975.00 Mandor 0.0052 Oh 100,000.00 520.00 Jumlah Pekerja 185,995.00

Jumlah Bahan + Pekerja 913,295.00 Keuntungan Max. 10 % 91,329.50 Jumlah Total 1,004,624.50 Dibulatkan 1,004,620.00

Page 85: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 85+29

A.11.09 1 M2 PASANG PINTU ALUMINIUMBAHAN :Pintu Alluminium 1.0000 m2 272,700.00 272,700.00 Jumlah Bahan 272,700.00 UPAH :Pekerja 1.0500 Oh 60,000.00 63,000.00 Tukang Besi Konstruksi 1.0500 Oh 75,000.00 78,750.00 Kepala Tukang 0.1050 Oh 95,000.00 9,975.00 Mandor 0.0052 Oh 100,000.00 520.00 Jumlah Pekerja 152,245.00

Jumlah Bahan + Pekerja 424,945.00 Keuntungan Max. 10 % 42,494.50 Jumlah Total 467,439.50 Dibulatkan 467,430.00

A.11.12 1 M2 PASANG TERALIS BESIBAHAN :Besi Strip 2x3 1.0000 m2 145,500.00 145,500.00 Jumlah Bahan 145,500.00 UPAH :Pekerja 1.2000 Oh 60,000.00 72,000.00 Tukang Kayu 1.2000 Oh 75,000.00 90,000.00 Kepala Tukang 0.0120 Oh 95,000.00 1,140.00 Mandor 0.00060 Oh 100,000.00 60.00 Jumlah Pekerja 163,200.00

Jumlah Bahan + Pekerja 308,700.00 Keuntungan Max. 10 % 30,870.00 Jumlah Total 339,570.00 Dibulatkan 339,570.00

A.11.17 1 M2 PASANG JENDELA NAKO DAN TRALISBAHAN :Jendela Nako 1.1000 m2 13,650.00 15,015.00 Paku Biasa 1/2"-1" atau skrup 0.0200 kg 16,400.00 328.00 Besi Strip 2x3 0.0250 m2 14,900.00 372.50 Jumlah Bahan 15,715.50 UPAH :Pekerja 0.2000 Oh 60,000.00 12,000.00 Tukang Kayu 0.2000 Oh 75,000.00 15,000.00 Kepala Tukang 0.0200 Oh 95,000.00 1,900.00 Mandor 0.00100 Oh 100,000.00 100.00 Jumlah Pekerja 29,000.00

Jumlah Bahan + Pekerja 44,715.50 Keuntungan Max. 10 % 4,471.55 Jumlah Total 49,187.05 Dibulatkan 49,180.00

A.11.18 1 M2 PASANG TALANG DATAR, SENG BJLS 28BAHAN :Seng Plat 3 x 6 bjls 28 0.5000 lbr 39,700.00 19,850.00 Paku Biasa 1/2"-1" 0.0150 kg 16,400.00 246.00 Kayu KAYU LOKAL KLS II, papan 0.0096 m3 6,381,800.00 61,265.28 Flincote/Meni Besi 0.2500 kg 28,400.00 7,100.00 Jumlah Bahan 88,461.28 UPAH :Pekerja 0.1500 Oh 60,000.00 9,000.00 Tukang Kayu 0.4000 Oh 75,000.00 30,000.00 Kepala Tukang 0.0250 Oh 95,000.00 2,375.00 Mandor 0.00125 Oh 100,000.00 125.00 Jumlah Pekerja 41,500.00

Jumlah Bahan + Pekerja 129,961.28 Keuntungan Max. 10 % 12,996.13 Jumlah Total 142,957.41 Dibulatkan 142,950.00

Page 86: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 86+29

A.11.19 1 M2 PASANG TALANG MIRING, SENG BJLS 28BAHAN :Seng Plat 3 x 6 bjls 28 0.5000 lbr 39,700.00 19,850.00 Paku Biasa 1/2"-1" 0.0150 kg 16,400.00 246.00 Kayu KAYU LOKAL KLS II, papan 0.0190 m3 6,381,800.00 121,254.20 Flincote/Meni Besi 0.3000 kg 28,400.00 8,520.00 Jumlah Bahan 149,870.20 UPAH :Pekerja 0.0400 Oh 60,000.00 2,400.00 Tukang Kayu 0.4000 Oh 75,000.00 30,000.00 Kepala Tukang 0.0250 Oh 95,000.00 2,375.00 Mandor 0.00125 Oh 100,000.00 125.00 Jumlah Pekerja 34,900.00

Jumlah Bahan + Pekerja 184,770.20 Keuntungan Max. 10 % 18,477.02 Jumlah Total 203,247.22 Dibulatkan 203,240.00

A.11.20 1 M2 PASANG TALANG 1/2 LINGKARAN D-10 CM, SENG BJLS 28BAHAN :Seng Plat 3 x 6 bjls 28 0.3000 lbr 39,700.00 11,910.00 Paku Biasa 1/2"-1" 0.1000 kg 16,400.00 1,640.00 Kayu KAYU LOKAL KLS II, papan 0.0190 m3 6,381,800.00 121,254.20 Besi Strip 0.5000 kg 17,300.00 8,650.00 Jumlah Bahan 143,454.20 UPAH :Pekerja 0.1500 Oh 60,000.00 9,000.00 Tukang Kayu 0.2500 Oh 75,000.00 18,750.00 Kepala Tukang 0.0250 Oh 95,000.00 2,375.00 Mandor 0.00125 Oh 100,000.00 125.00 Jumlah Pekerja 30,250.00

Jumlah Bahan + Pekerja 173,704.20 Keuntungan Max. 10 % 17,370.42 Jumlah Total 191,074.62 Dibulatkan 191,070.00

A.11.21 1 M2 PASANG TALANG 1/2 LINGKARAN D-10 CM, SENG BJLS 24BAHAN :Seng Plat 3 x 6 bjls 24 0.3000 lbr 39,700.00 11,910.00 Paku Biasa 1/2"-1" 0.1000 kg 16,400.00 1,640.00 Kayu KAYU LOKAL KLS II, papan 0.0190 m3 6,381,800.00 121,254.20 Besi Strip 0.5000 kg 17,300.00 8,650.00 Jumlah Bahan 143,454.20 UPAH :Pekerja 0.1500 Oh 60,000.00 9,000.00 Tukang Kayu 0.2500 Oh 75,000.00 18,750.00 Kepala Tukang 0.0250 Oh 95,000.00 2,375.00 Mandor 0.00125 Oh 100,000.00 125.00 Jumlah Pekerja 30,250.00

Jumlah Bahan + Pekerja 173,704.20 Keuntungan Max. 10 % 17,370.42 Jumlah Total 191,074.62 Dibulatkan 191,070.00

A.12.02 1 BUAH PASANG KUNCI TANAM BIASABAHAN :Kunci Tanam biasa 1.0000 bh 87,350.00 87,350.00 Jumlah Bahan 87,350.00 UPAH :Pekerja 0.0100 Oh 60,000.00 600.00 Tukang Kayu 0.5000 Oh 75,000.00 37,500.00 Kepala Tukang 0.0100 Oh 95,000.00 950.00 Mandor 0.0050 Oh 100,000.00 500.00 Jumlah Pekerja 39,550.00

Jumlah Bahan + Pekerja 126,900.00 Keuntungan Max. 10 % 12,690.00 Jumlah Total 139,590.00 Dibulatkan 139,590.00

Page 87: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 87+29

A.12.03 1 BUAH PASANG KUNCI TANAM KAMAR MANDIBAHAN :Kunci Tanam Kamar Mandi 1.0000 bh 40,950.00 40,950.00 Jumlah Bahan 40,950.00 UPAH :Pekerja 0.0050 Oh 60,000.00 300.00 Tukang Kayu 0.5000 Oh 75,000.00 37,500.00 Kepala Tukang 0.0050 Oh 95,000.00 475.00 Mandor 0.0025 Oh 100,000.00 250.00 Jumlah Pekerja 38,525.00

Jumlah Bahan + Pekerja 79,475.00 Keuntungan Max. 10 % 7,947.50 Jumlah Total 87,422.50 Dibulatkan 87,420.00

A.12.04 1 BUAH PASANG KUNCI SILINDERBAHAN :Kunci Silinder 1.0000 bh 204,750.00 204,750.00 Jumlah Bahan 204,750.00 UPAH :Pekerja 0.0050 Oh 60,000.00 300.00 Tukang Kayu 0.5000 Oh 75,000.00 37,500.00 Kepala Tukang 0.0050 Oh 95,000.00 475.00 Mandor 0.00025 Oh 100,000.00 25.00 Jumlah Pekerja 38,300.00

Jumlah Bahan + Pekerja 243,050.00 Keuntungan Max. 10 % 24,305.00 Jumlah Total 267,355.00 Dibulatkan 267,350.00

A.12.05 1 BUAH PASANG ENGSEL PINTUBAHAN :Engsel pIntu 1.0000 bh 12,200.00 12,200.00 Jumlah Bahan 12,200.00 UPAH :Pekerja 0.0150 Oh 60,000.00 900.00 Tukang Kayu 0.1000 Oh 75,000.00 7,500.00 Kepala Tukang 0.0150 Oh 95,000.00 1,425.00 Mandor 0.00075 Oh 100,000.00 75.00 Jumlah Pekerja 9,900.00

Jumlah Bahan + Pekerja 22,100.00 Keuntungan Max. 10 % 2,210.00 Jumlah Total 24,310.00 Dibulatkan 24,310.00

A.12.06 1 BUAH PASANG ENGSEL JENDELA KUPU-KUPUBAHAN :Engsel Jendela 1.0000 bh 7,400.00 7,400.00 Jumlah Bahan 7,400.00 UPAH :Pekerja 0.0100 Oh 60,000.00 600.00 Tukang Kayu 0.1000 Oh 75,000.00 7,500.00 Kepala Tukang 0.0100 Oh 95,000.00 950.00 Mandor 0.00050 Oh 100,000.00 50.00 Jumlah Pekerja 9,100.00

Jumlah Bahan + Pekerja 16,500.00 Keuntungan Max. 10 % 1,650.00 Jumlah Total 18,150.00 Dibulatkan 18,150.00

A.12.09 1 BUAH PASANG KAIT ANGINBAHAN :Kait Angin 1.0000 ps 6,750.00 6,750.00 Jumlah Bahan 6,750.00 UPAH :Pekerja 0.0150 Oh 60,000.00 900.00 Tukang Kayu 0.1500 Oh 75,000.00 11,250.00 Kepala Tukang 0.0150 Oh 95,000.00 1,425.00 Mandor 0.00075 Oh 100,000.00 75.00 Jumlah Pekerja 13,650.00

Jumlah Bahan + Pekerja 20,400.00 Keuntungan Max. 10 % 2,040.00 Jumlah Total 22,440.00 Dibulatkan 22,440.00

Page 88: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 88+29

A.12.10 1 BUAH PASANG DOOR CLOSERBAHAN :Door Closer 1.0000 bh 129,600.00 129,600.00 Jumlah Bahan 129,600.00 UPAH :Pekerja 0.0500 Oh 60,000.00 3,000.00 Tukang Kayu 0.5000 Oh 75,000.00 37,500.00 Kepala Tukang 0.0500 Oh 95,000.00 4,750.00 Mandor 0.00250 Oh 100,000.00 250.00 Jumlah Pekerja 45,500.00

Jumlah Bahan + Pekerja 175,100.00 Keuntungan Max. 10 % 17,510.00 Jumlah Total 192,610.00 Dibulatkan 192,610.00

A.12.11 1 BUAH PASANG KUNCI SELOTBAHAN :Kunci Selot 1.0000 bh 6,750.00 6,750.00 Jumlah Bahan 6,750.00 UPAH :Pekerja 0.0200 Oh 60,000.00 1,200.00 Tukang Kayu 0.2000 Oh 75,000.00 15,000.00 Kepala Tukang 0.0200 Oh 95,000.00 1,900.00 Mandor 0.00100 Oh 100,000.00 100.00 Jumlah Pekerja 18,200.00

Jumlah Bahan + Pekerja 24,950.00 Keuntungan Max. 10 % 2,495.00 Jumlah Total 27,445.00 Dibulatkan 27,440.00

A.12.12 1 BUAH PASANG PEGANGAN PINTU / DOOR HOLDERBAHAN :Door Holder 1.0000 bh 23,000.00 23,000.00 Jumlah Bahan 23,000.00 UPAH :Pekerja 0.0500 Oh 60,000.00 3,000.00 Tukang Kayu 0.5000 Oh 75,000.00 37,500.00 Kepala Tukang 0.0500 Oh 95,000.00 4,750.00 Mandor 0.00250 Oh 100,000.00 250.00 Jumlah Pekerja 45,500.00

Jumlah Bahan + Pekerja 68,500.00 Keuntungan Max. 10 % 6,850.00 Jumlah Total 75,350.00 Dibulatkan 75,350.00

A.12.14 1 BUAH PASANG REL PINTU DORONGBAHAN :Rel Pintu Dorong 1.0000 bh 64,800.00 64,800.00 Jumlah Bahan 64,800.00 UPAH :Pekerja 0.0600 Oh 60,000.00 3,600.00 Tukang Kayu 0.6000 Oh 75,000.00 45,000.00 Kepala Tukang 0.0600 Oh 95,000.00 5,700.00 Mandor 0.00300 Oh 100,000.00 300.00 Jumlah Pekerja 54,600.00

Jumlah Bahan + Pekerja 119,400.00 Keuntungan Max. 10 % 11,940.00 Jumlah Total 131,340.00 Dibulatkan 131,340.00

A.12.16 1 M2 PASANG KACA, TEBAL 3 MMBAHAN :Kaca 1.1000 m2 61,800.00 67,980.00 Jumlah Bahan 67,980.00 UPAH :Pekerja 0.0150 Oh 60,000.00 900.00 Tukang Kayu 0.1500 Oh 75,000.00 11,250.00 Kepala Tukang 0.0150 Oh 95,000.00 1,425.00 Mandor 0.00075 Oh 100,000.00 75.00 Jumlah Pekerja 13,650.00

Jumlah Bahan + Pekerja 81,630.00 Keuntungan Max. 10 % 8,163.00 Jumlah Total 89,793.00 Dibulatkan 89,790.00

Page 89: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 89+29

A.12.17 1 M2 PASANG KACA, TEBAL 5 MMBAHAN :Kaca 1.1000 m2 69,100.00 76,010.00 Jumlah Bahan 76,010.00 UPAH :Pekerja 0.0150 Oh 60,000.00 900.00 Tukang Kayu 0.1500 Oh 75,000.00 11,250.00 Kepala Tukang 0.0150 Oh 95,000.00 1,425.00 Mandor 0.00075 Oh 100,000.00 75.00 Jumlah Pekerja 13,650.00

Jumlah Bahan + Pekerja 89,660.00 Keuntungan Max. 10 % 8,966.00 Jumlah Total 98,626.00 Dibulatkan 98,620.00

A.12.18 1 M2 PASANG KACA, TEBAL 8 MMBAHAN :Kaca 1.1000 m2 120,000.00 132,000.00 Jumlah Bahan 132,000.00 UPAH :Pekerja 0.0165 Oh 60,000.00 990.00 Tukang Kayu 0.1650 Oh 75,000.00 12,375.00 Kepala Tukang 0.0165 Oh 95,000.00 1,567.50 Mandor 0.00080 Oh 100,000.00 80.00 Jumlah Pekerja 15,012.50

Jumlah Bahan + Pekerja 147,012.50 Keuntungan Max. 10 % 14,701.25 Jumlah Total 161,713.75 Dibulatkan 161,710.00

A.12.19 1 M2 PASANG KACA BURAM, TEBAL 12 MMBAHAN :Kaca Buram 1.1000 m2 496,400.00 546,040.00 Sealent 0.0500 kg - Jumlah Bahan 546,040.00 UPAH :Pekerja 0.0250 Oh 60,000.00 1,500.00 Tukang Kayu 0.2500 Oh 75,000.00 18,750.00 Kepala Tukang 0.0250 Oh 95,000.00 2,375.00 Mandor 0.00125 Oh 100,000.00 125.00 Jumlah Pekerja 22,750.00

Jumlah Bahan + Pekerja 568,790.00 Keuntungan Max. 10 % 56,879.00 Jumlah Total 625,669.00 Dibulatkan 625,660.00

A.12.24 1 M2 PASANG KACA PATRI, TEBAL 5 MMBAHAN :Kaca Patri 1.1000 m2 69,100.00 76,010.00 Jumlah Bahan 76,010.00 UPAH :Pekerja 0.0150 Oh 60,000.00 900.00 Tukang Kayu 0.1500 Oh 75,000.00 11,250.00 Kepala Tukang 0.0150 Oh 95,000.00 1,425.00 Mandor 0.00075 Oh 100,000.00 75.00 Jumlah Pekerja 13,650.00

Jumlah Bahan + Pekerja 89,660.00 Keuntungan Max. 10 % 8,966.00 Jumlah Total 98,626.00 Dibulatkan 98,620.00

A.12.25 1 KG PEK. ERECTION KONST KUDA-KUDA BESIPekerja terampil 0.0010 org 70,000.00 70.00 Tukang besi profil terampil 0.0010 org 90,000.00 90.00 Kepala tukang besi profil 0.0002 org 95,000.00 19.00 Mandor 0.0001 org 100,000.00 10.00 Operator alat besar 0.0002 org 90,000.00 18.00 Pembantu operator 0.0200 org 60,000.00 1,200.00 Sewa alat ( Las Listrik + Tuckle ) 0.0002 ls 28,750.00 5.75 Bahan bakar solar 0.0100 lt 8,500.00 85.00 Pelumas 0.0010 lt 36,600.00 36.60 Alat bantu 0.0002 lot 1,534.35 0.31 Jumlah 1,534.66 Keuntungan Max. 10 % 153.47 Jumlah 1,688.12 Dibulatkan 1,680.00

Page 90: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 90+29

A.12.26 1 KG PEKERJAAN BAJA IWF EX DNBesi IWF ex DN SII 1.0500 kg 16,800.00 17,640.00

Jumlah Bahan 17,640.00 UPAH :Pekerja Terampil 0.0600 org 70,000.00 4,200.00 Tukang besi profil terampil 0.0040 org 90,000.00 360.00 Kepala tukang besi profil 0.0010 org 95,000.00 95.00 Mandor 0.0002 org 100,000.00 20.00 Peralatan ( Alat las, dll) 0.1250 lot 22,315.00 2,789.38 Jumlah Pekerja 7,464.38

Jumlah Bahan + Pekerja 25,104.38 Keuntungan Max. 10 % 2,510.44 Jumlah Total 27,614.81 Dibulatkan 27,610.00

A.12.27 1 KG PEKERJAAN BAJA EX JAPANBesi IWF ex Japan 1.0500 kg 19,800.00 20,790.00

Jumlah Bahan 20,790.00 UPAH :Pekerja Terampil 0.0600 org 70,000.00 4,200.00 Tukang besi profil terampil 0.0040 org 90,000.00 360.00 Kepala tukang besi profil 0.0010 org 95,000.00 95.00 Mandor 0.0002 org 100,000.00 20.00 Peralatan ( Alat las, dll) 0.1250 lot 25,465.00 3,183.13 Jumlah Pekerja 7,858.13

Jumlah Bahan + Pekerja 28,648.13 Keuntungan Max. 10 % 2,864.81 Jumlah Total 31,512.94 Dibulatkan 31,510.00 Dibulatkan 31,510.00

A.12.28 1 KG PEK. KONSTRUKSI BESI SIKU / PROFIL EX. DNBesi profil / besi siku ex DN 1.0500 kg 19,800.00 20,790.00

Jumlah Bahan 20,790.00 UPAH :Pekerja Terampil 0.0600 org 70,000.00 4,200.00 Tukang besi profil terampil 0.0040 org 90,000.00 360.00 Kepala tukang besi profil 0.0010 org 95,000.00 95.00 Mandor 0.0002 org 100,000.00 20.00 Peralatan ( Alat las, dll) 0.1250 lot 25,465.00 3,183.13 Jumlah Pekerja 7,858.13

Jumlah Bahan + Pekerja 28,648.13 Keuntungan Max. 10 % 2,864.81 Jumlah Total 31,512.94 Dibulatkan 31,510.00

A.12.29 1 Titik PEK. PENGELASAN DENGAN LAS LISTRIK TEBAL = KAWAT 4 MMKawat las listrik 0.0400 kg 37,100.00 1,484.00 Bahan bakar solar 0.0300 lt 8,500.00 255.00 Pelumas 0.0040 lt 36,600.00 146.40 Jumlah Bahan 1,885.40 UPAH :Pekerja Terampil 0.0040 org 70,000.00 280.00 Tukang besi profil terampil 0.0020 org 90,000.00 180.00 Kepala tukang besi profil 0.0020 org 95,000.00 190.00 Mandor 0.0010 org 100,000.00 100.00 Alat bantu ( Mesin Las Listrik) 0.2500 lot 2,635.40 658.85 Jumlah Pekerja 1,408.85

Jumlah Bahan + Pekerja 3,294.25 Keuntungan Max. 10 % 329.43 Jumlah Total 3,623.68 Dibulatkan 3,620.00

A.12.30 1 TITIK MELOBANG KONSTRUKSI BESI DENGAN BORPekerja Terampil 0.0500 org 70,000.00 3,500.00 Tukang besi profil terampil 0.0200 org 90,000.00 1,800.00 Kepala tukang besi profil 0.0030 org 95,000.00 285.00 Mandor 0.0010 org 100,000.00 100.00 Alat bantu ( Mesin Bor Listrik ) 0.2500 lot 5,685.00 1,421.25 Jumlah 7,106.25 Keuntungan Max. 10 % 710.63 Jumlah 7,816.88 Dibulatkan 7,810.00

Page 91: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 91+29

A.12.31 1 M2 PEKERJAAN BONDEXBondek 1.0100 m² 200,900.00 202,909.00 Kawat las 0.1000 kg 37,100.00 3,710.00

Jumlah Bahan 206,619.00 UPAH :Pekerja terampil 0.0500 org 70,000.00 3,500.00 Tukang besi profil setengah trampil 0.0300 org 75,000.00 2,250.00 Mandor 0.0100 org 100,000.00 1,000.00 Shear Connector 1.0000 ls 16,499.00 16,499.00 Jumlah Pekerja 23,249.00

Jumlah Bahan + Pekerja 229,868.00 Keuntungan Max. 10 % 22,986.80 Jumlah Total 252,854.80 Dibulatkan 252,850.00

A.12.32 1 M2 PEKERJAAN WIREMESH M8Wiremesh M8 1.0100 m² 56,700.00 57,267.00 Kawat las 0.1000 kg 37,100.00 3,710.00

Jumlah Bahan 60,977.00 UPAH :Pekerja terampil 0.1000 org 70,000.00 7,000.00 Tukang besi profil setengah trampil 0.0750 org 75,000.00 5,625.00 Mandor 0.0100 org 100,000.00 1,000.00 Jumlah Pekerja 13,625.00

Jumlah Bahan + Pekerja 74,602.00 Keuntungan Max. 10 % 7,460.20 Jumlah Total 82,062.20 Dibulatkan 82,060.00

A.12.33 1 M1 PEK.PAGAR DEPAN TRALIS STANDARDGalian Tanah 0.4500 m³ 28,000.00 12,600.00 Urugan Pasir 10 cm' 0.0800 m³ 139,000.00 11,120.00 Pasang Aanstamping 0.1200 m³ 297,155.00 35,658.60 Pas.Batu Belah 1 pc : 4 psr 0.2000 m³ 669,014.00 133,802.80 Plesteran & Acian 1 pc : 4 psr 0.4100 m² 37,399.00 15,333.59 Beton Tulang ( 100 kg/m3 ) 0.0563 m³ 2,798,818.00 157,433.51 Pagar Tralis 1.5000 m' 818,200.00 1,227,300.00 Pengecatan 1.0000 m² 50,177.80 50,177.80 Jumlah 1,643,426.30 Keuntungan Max. 10 % 164,342.63 Jumlah 1,807,768.93 Dibulatkan 1,807,760.00

A.12.34 1 M1 PEK. PAGAR BELAKANG / SAMPINGGalian Tanah 0.4500 m³ 28,000.00 12,600.00 Urugan Pasir 10 cm' 0.0800 m³ 139,000.00 11,120.00 Pasang Aanstamping 0.1200 m³ 297,155.00 35,658.60 Pas.Batu Belah 1 pc : 4 psr 0.2000 m³ 669,014.00 133,802.80 Pas.bata + plesteran 1 : 4 1.8000 m² 155,768.48 280,383.27 Beton Tulang ( 100 kg/m3 ) 0.0563 m³ 2,798,818.00 157,433.51 Besi Siku 1.0000 kg 16,300.00 16,300.00 Kawat Duri 3.0000 m1 4,300.00 12,900.00 Pengecatan 1.0000 m² 24,985.00 24,985.00 Jumlah 685,183.18 Keuntungan Max. 10 % 68,518.32 Jumlah 753,701.50 Dibulatkan 753,700.00

A.13.02 1 M2 PASANG LANTAI TEGEL BADAK ABU-ABU UKURAN 30X30 CMBAHAN :Tegel Badak Abu-abu 30x30 cm 11.8700 bh 4,300.00 51,041.00 Semen Portland 8.4000 kg 1,800.00 15,120.00 Pasir Pasang 0.0215 m3 118,200.00 2,541.30 Jumlah Bahan 68,702.30 UPAH :Pekerja 0.2600 Oh 60,000.00 15,600.00 Tukang Batu 0.1250 Oh 75,000.00 9,375.00 Kepala Tukang 0.0125 Oh 95,000.00 1,187.50 Mandor 0.00130 Oh 100,000.00 130.00 Jumlah Pekerja 26,292.50

Jumlah Bahan + Pekerja 94,994.80 Keuntungan Max. 10 % 9,499.48 Jumlah Total 104,494.28 Dibulatkan 104,490.00

Page 92: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 92+29

A.13.09 1 M2 PASANG LANTAI UBIN GRANITO UKURAN 40X40 CMBAHAN :Ubin Granito 40x40 cm 6.9300 bh 75,209.24 521,200.00 Semen Portland 8.4000 kg 1,800.00 15,120.00 Pasir Pasang 0.0215 m3 118,200.00 2,541.30 Semen Warna 0.5000 kg 9,100.00 4,550.00 Jumlah Bahan 543,411.30 UPAH :Pekerja 0.2500 Oh 60,000.00 15,000.00 Tukang Batu 0.1200 Oh 75,000.00 9,000.00 Kepala Tukang 0.0120 Oh 95,000.00 1,140.00 Mandor 0.00125 Oh 100,000.00 125.00 Jumlah Pekerja 25,265.00

Jumlah Bahan + Pekerja 568,676.30 Keuntungan Max. 10 % 56,867.63 Jumlah Total 625,543.93 Dibulatkan 625,540.00

A.13.42 1 M2 PASANG LANTAI KERAMIK 10 X 20 CMBAHAN :Ubin Keramik 10 x 20 cm 50.0000 bh 1,636.00 81,800.00 Semen Portland 8.4000 kg 1,800.00 15,120.00 Pasir Pasang 0.0420 m3 118,200.00 4,964.40 Semen Warna 0.5000 kg 9,100.00 4,550.00 Jumlah Bahan 106,434.40 UPAH :Pekerja 0.6200 Oh 60,000.00 37,200.00 Tukang Batu 0.3500 Oh 75,000.00 26,250.00 Kepala Tukang 0.0350 Oh 95,000.00 3,325.00 Mandor 0.00300 Oh 100,000.00 300.00 Jumlah Pekerja 67,075.00

Jumlah Bahan + Pekerja 173,509.40 Keuntungan Max. 10 % 17,350.94 Jumlah Total 190,860.34 Dibulatkan 190,860.00

A.13.44 1 M2 PASANG LANTAI KERAMIK 20 X 20 CMBAHAN :Ubin Keramik 20 x 20 cm 25.0000 bh 3,272.00 81,800.00 Semen Portland 8.4000 kg 1,800.00 15,120.00 Pasir Pasang 0.0420 m3 118,200.00 4,964.40 Semen Warna 0.5000 kg 9,100.00 4,550.00 Jumlah Bahan 106,434.40 UPAH :Pekerja 0.6200 Oh 60,000.00 37,200.00 Tukang Batu 0.3500 Oh 75,000.00 26,250.00 Kepala Tukang 0.0350 Oh 95,000.00 3,325.00 Mandor 0.00300 Oh 100,000.00 300.00 Jumlah Pekerja 67,075.00

Jumlah Bahan + Pekerja 173,509.40 Keuntungan Max. 10 % 17,350.94 Jumlah Total 190,860.34 Dibulatkan 190,860.00

A.13.45 1 M2 PASANG LANTAI KERAMIK 25 X 25 CMBAHAN :Ubin Keramik 25 x 25 cm 16.0000 bh 4,887.50 78,200.00 Semen Portland 8.4000 kg 1,800.00 15,120.00 Pasir Pasang 0.0420 m3 118,200.00 4,964.40 Semen Warna 0.5000 kg 9,100.00 4,550.00 Jumlah Bahan 102,834.40 UPAH :Pekerja 0.6200 Oh 60,000.00 37,200.00 Tukang Batu 0.3500 Oh 75,000.00 26,250.00 Kepala Tukang 0.0350 Oh 95,000.00 3,325.00 Mandor 0.00300 Oh 100,000.00 300.00 Jumlah Pekerja 67,075.00

Jumlah Bahan + Pekerja 169,909.40 Keuntungan Max. 10 % 16,990.94 Jumlah Total 186,900.34 Dibulatkan 186,900.00

Page 93: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 93+29

A.13.46 1 M2 PASANG LANTAI KERAMIK 15 X 20 CMBAHAN :Ubin Keramik 15 x 20 cm 35.0000 bh 2,337.14 81,800.00 Semen Portland 8.4000 kg 1,800.00 15,120.00 Pasir Pasang 0.0420 m3 118,200.00 4,964.40 Semen Warna 0.5000 kg 9,100.00 4,550.00 Jumlah Bahan 106,434.40 UPAH :Pekerja 0.6200 Oh 60,000.00 37,200.00 Tukang Batu 0.3500 Oh 75,000.00 26,250.00 Kepala Tukang 0.0350 Oh 95,000.00 3,325.00 Mandor 0.00300 Oh 100,000.00 300.00 Jumlah Pekerja 67,075.00

Jumlah Bahan + Pekerja 173,509.40 Keuntungan Max. 10 % 17,350.94 Jumlah Total 190,860.34 Dibulatkan 190,860.00

A.13.47 1 M2 PASANG LANTAI KERAMIK 33 X 33 CMBAHAN :Ubin Keramik 33 x 33 cm 10.0000 bh 10,000.00 100,000.00 Semen Portland 8.4000 kg 1,800.00 15,120.00 Pasir Pasang 0.0420 m3 118,200.00 4,964.40 Semen Warna 0.5000 kg 9,100.00 4,550.00 Jumlah Bahan 124,634.40 UPAH :Pekerja 0.6200 Oh 60,000.00 37,200.00 Tukang Batu 0.3500 Oh 75,000.00 26,250.00 Kepala Tukang 0.0350 Oh 95,000.00 3,325.00 Mandor 0.00300 Oh 100,000.00 300.00 Jumlah Pekerja 67,075.00

Jumlah Bahan + Pekerja 191,709.40 Keuntungan Max. 10 % 19,170.94 Jumlah Total 210,880.34 Dibulatkan 210,880.00

A.13.48 1 M2 PASANG LANTAI KERAMIK 33 X 33 CM ANTISLIPBAHAN :Ubin Keramik 33 x 33 cm Antislip 10.0000 bh 10,910.00 109,100.00 Semen Portland 8.4000 kg 1,800.00 15,120.00 Pasir Pasang 0.0420 m3 118,200.00 4,964.40 Semen Warna 0.5000 kg 9,100.00 4,550.00 Jumlah Bahan 133,734.40 UPAH :Pekerja 0.6200 Oh 60,000.00 37,200.00 Tukang Batu 0.3500 Oh 75,000.00 26,250.00 Kepala Tukang 0.0350 Oh 95,000.00 3,325.00 Mandor 0.00300 Oh 100,000.00 300.00 Jumlah Pekerja 67,075.00

Jumlah Bahan + Pekerja 200,809.40 Keuntungan Max. 10 % 20,080.94 Jumlah Total 220,890.34 Dibulatkan 220,890.00

A.13.49 1 M2 PASANG LANTAI KERAMIK 10 X 33 CM BAHAN :Ubin Keramik 10 x 33 cm 33.0000 bh 3,030.30 100,000.00 Semen Portland 8.4000 kg 1,800.00 15,120.00 Pasir Pasang 0.0420 m3 118,200.00 4,964.40 Semen Warna 0.5000 kg 9,100.00 4,550.00 Jumlah Bahan 124,634.40 UPAH :Pekerja 0.6200 Oh 60,000.00 37,200.00 Tukang Batu 0.3500 Oh 75,000.00 26,250.00 Kepala Tukang 0.0350 Oh 95,000.00 3,325.00 Mandor 0.00300 Oh 100,000.00 300.00 Jumlah Pekerja 67,075.00

Jumlah Bahan + Pekerja 191,709.40 Keuntungan Max. 10 % 19,170.94 Jumlah Total 210,880.34 Dibulatkan 210,880.00

Page 94: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 94+29

A.13.51 1 M2 PASANG LANTAI MARMERBAHAN :Marmer 1.0520 bh 328,700.00 345,792.40 Semen Portland 8.4000 kg 1,800.00 15,120.00 Pasir Pasang 0.0390 m3 118,200.00 4,609.80 Semen Warna 2.0000 kg 9,100.00 18,200.00 Jumlah Bahan 383,722.20 UPAH :Pekerja 0.6200 Oh 60,000.00 37,200.00 Tukang Batu 0.3500 Oh 75,000.00 26,250.00 Kepala Tukang 0.0350 Oh 95,000.00 3,325.00 Mandor 0.03000 Oh 100,000.00 3,000.00 Jumlah Pekerja 69,775.00

Jumlah Bahan + Pekerja 453,497.20 Keuntungan Max. 10 % 45,349.72 Jumlah Total 498,846.92 Dibulatkan 498,840.00

A.13.56 1 M2 PASANG LANTAI PARQUET JATIBAHAN :Parquet Jati 1.0500 m2 581,800.00 610,890.00 Lem Vinyl 0.6000 kg 23,600.00 14,160.00 Jumlah Bahan 625,050.00 UPAH :Pekerja 0.6500 Oh 60,000.00 39,000.00 Tukang 0.3500 Oh 90,000.00 31,500.00 Kepala Tukang 0.0350 Oh 95,000.00 3,325.00 Mandor 0.03250 Oh 100,000.00 3,250.00 Jumlah Pekerja 77,075.00

Jumlah Bahan + Pekerja 702,125.00 Keuntungan Max. 10 % 70,212.50 Jumlah Total 772,337.50 Dibulatkan 772,330.00

A.13.58 1 M2 PASANG DINDING PORSELEN 11 X 11 CM, PUTIHBAHAN :Porselen 11 x 11 cm 83.0000 bh 760.24 63,100.00 Semen Abu-abu 8.4000 kg 1,800.00 15,120.00 Pasir Pasang 0.0180 m3 118,200.00 2,127.60 Semen Warna 0.5000 kg 9,100.00 4,550.00 Jumlah Bahan 84,897.60 UPAH :Pekerja 0.6200 Oh 60,000.00 37,200.00 Tukang Batu 0.5000 Oh 75,000.00 37,500.00 Kepala Tukang 0.0500 Oh 95,000.00 4,750.00 Mandor 0.00300 Oh 100,000.00 300.00 Jumlah Pekerja 79,750.00

Jumlah Bahan + Pekerja 164,647.60 Keuntungan Max. 10 % 16,464.76 Jumlah Total 181,112.36 Dibulatkan 181,110.00

A.13.59 1 M2 PASANG DINDING PORSELEN 11 X 11 CM, WARNABAHAN :Porselen 11 x 11 cm, Warna 83.0000 bh 880.72 73,100.00 Semen Abu-abu 8.4000 kg 1,800.00 15,120.00 Pasir Pasang 0.0180 m3 118,200.00 2,127.60 Semen Warna 0.5000 kg 9,100.00 4,550.00 Jumlah Bahan 94,897.60 UPAH :Pekerja 0.6200 Oh 60,000.00 37,200.00 Tukang Batu 0.5000 Oh 75,000.00 37,500.00 Kepala Tukang 0.0500 Oh 95,000.00 4,750.00 Mandor 0.00300 Oh 100,000.00 300.00 Jumlah Pekerja 79,750.00

Jumlah Bahan + Pekerja 174,647.60 Keuntungan Max. 10 % 17,464.76 Jumlah Total 192,112.36 Dibulatkan 192,110.00

Page 95: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 95+29

A.13.62 1 M2 PASANG DINDING PORSELEN 10 X 20 CM, WARNABAHAN :Porselen 10 x 20 cm, Warna 50.0000 bh 1,636.00 81,800.00 Semen Abu-abu 8.4000 kg 1,800.00 15,120.00 Pasir Pasang 0.0180 m3 118,200.00 2,127.60 Semen Warna 0.5000 kg 9,100.00 4,550.00 Jumlah Bahan 103,597.60 UPAH :Pekerja 0.6000 Oh 60,000.00 36,000.00 Tukang Batu 0.4500 Oh 75,000.00 33,750.00 Kepala Tukang 0.0450 Oh 95,000.00 4,275.00 Mandor 0.00300 Oh 100,000.00 300.00 Jumlah Pekerja 74,325.00

Jumlah Bahan + Pekerja 177,922.60 Keuntungan Max. 10 % 17,792.26 Jumlah Total 195,714.86 Dibulatkan 195,710.00

A.13.63 1 M2 PASANG DINDING PORSELEN 20 X 20 CM, WARNABAHAN :Porselen 20 x 20 cm, Warna 25.0000 bh 3,272.00 81,800.00 Semen Abu-abu 8.4000 kg 1,800.00 15,120.00 Pasir Pasang 0.0180 m3 118,200.00 2,127.60 Semen Warna 0.5000 kg 9,100.00 4,550.00 Jumlah Bahan 103,597.60 UPAH :Pekerja 0.6000 Oh 60,000.00 36,000.00 Tukang Batu 0.4500 Oh 75,000.00 33,750.00 Kepala Tukang 0.0450 Oh 95,000.00 4,275.00 Mandor 0.03000 Oh 100,000.00 3,000.00 Jumlah Pekerja 77,025.00

Jumlah Bahan + Pekerja 180,622.60 Keuntungan Max. 10 % 18,062.26 Jumlah Total 198,684.86 Dibulatkan 198,680.00

A.13.66 1 M2 PASANG DINDING KERAMIK 10 X 20 CM, BAHAN :Keramik 10 x 20 cm 50.0000 bh 1,636.00 81,800.00 Semen Abu-abu 8.4000 kg 1,800.00 15,120.00 Pasir Pasang 0.0180 m3 118,200.00 2,127.60 Semen Warna 0.5000 kg 9,100.00 4,550.00 Jumlah Bahan 103,597.60 UPAH :Pekerja 0.6000 Oh 60,000.00 36,000.00 Tukang Batu 0.4500 Oh 75,000.00 33,750.00 Kepala Tukang 0.0450 Oh 95,000.00 4,275.00 Mandor 0.00300 Oh 100,000.00 300.00 Jumlah Pekerja 74,325.00

Jumlah Bahan + Pekerja 177,922.60 Keuntungan Max. 10 % 17,792.26 Jumlah Total 195,714.86 Dibulatkan 195,710.00

A.13.68 1 M2 PASANG DINDING KERAMIK 20 X 20 CM, BAHAN :Keramik 20 x 20 cm 25.0000 bh 3,272.00 81,800.00 Semen Abu-abu 8.4000 kg 1,800.00 15,120.00 Pasir Pasang 0.0180 m3 118,200.00 2,127.60 Semen Warna 0.5000 kg 9,100.00 4,550.00 Jumlah Bahan 103,597.60 UPAH :Pekerja 0.6000 Oh 60,000.00 36,000.00 Tukang Batu 0.1000 Oh 75,000.00 7,500.00 Kepala Tukang 0.0450 Oh 95,000.00 4,275.00 Mandor 0.00300 Oh 100,000.00 300.00 Jumlah Pekerja 48,075.00

Jumlah Bahan + Pekerja 151,672.60 Keuntungan Max. 10 % 15,167.26 Jumlah Total 166,839.86 Dibulatkan 166,830.00

Page 96: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 96+29

A.13.69 1 M2 PASANG DINDING KERAMIK 10 X 20 CM, BAHAN :Keramik 10 x 20 cm 50.0000 bh 1,636.00 81,800.00 Semen Abu-abu 8.4000 kg 1,800.00 15,120.00 Pasir Pasang 0.0180 m3 118,200.00 2,127.60 Semen Warna 0.5000 kg 9,100.00 4,550.00 Jumlah Bahan 103,597.60 UPAH :Pekerja 0.6000 Oh 60,000.00 36,000.00 Tukang Batu 0.1250 Oh 75,000.00 9,375.00 Kepala Tukang 0.0125 Oh 95,000.00 1,187.50 Mandor 0.00300 Oh 100,000.00 300.00 Jumlah Pekerja 46,862.50

Jumlah Bahan + Pekerja 150,460.10 Keuntungan Max. 10 % 15,046.01 Jumlah Total 165,506.11 Dibulatkan 165,500.00

A.13.70 1 M2 PASANG DINDING MARMERBAHAN :Marmer 1.0200 m2 328,700.00 335,274.00 Paku Cacing 2.0000 bh 22,700.00 45,400.00 Semen Abu-abu 12.4400 kg 1,800.00 22,392.00 Pasir Pasang 0.0250 m3 118,200.00 2,955.00 Semen Warna 0.5000 kg 9,100.00 4,550.00 Jumlah Bahan 410,571.00 UPAH :Pekerja 0.7200 Oh 60,000.00 43,200.00 Tukang Batu 0.6500 Oh 75,000.00 48,750.00 Kepala Tukang 0.0650 Oh 95,000.00 6,175.00 Mandor 0.0035 Oh 100,000.00 350.00 Jumlah Pekerja 98,475.00

Jumlah Bahan + Pekerja 509,046.00 Keuntungan Max. 10 % 50,904.60 Jumlah Total 559,950.60 Dibulatkan 559,950.00

A.13.74 1 M2 PASANG DINDING BATU TEMPELBAHAN :Batu Tempel Hitam 1.0500 m2 212,700.00 223,335.00 Semen Abu-abu 11.7500 kg 1,800.00 21,150.00 Pasir Pasang 0.0350 m3 118,200.00 4,137.00 Jumlah Bahan 248,622.00 UPAH :Pekerja 0.6200 Oh 60,000.00 37,200.00 Tukang Batu 0.3500 Oh 75,000.00 26,250.00 Kepala Tukang 0.0350 Oh 95,000.00 3,325.00 Mandor 0.0030 Oh 100,000.00 300.00 Jumlah Pekerja 67,075.00

Jumlah Bahan + Pekerja 315,697.00 Keuntungan Max. 10 % 31,569.70 Jumlah Total 347,266.70 Dibulatkan 347,260.00

A.13.75 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM DN PUTIH POLOSBAHAN :Ubin Keramik 30 x 30 cm 12.0000 bh 6,208.33 74,500.00 Semen Portland 8.4000 kg 1,800.00 15,120.00 Pasir Pasang 0.0420 m3 118,200.00 4,964.40 Semen Warna 0.5000 kg 9,100.00 4,550.00 Jumlah Bahan 99,134.40 UPAH :Pekerja 0.6200 Oh 60,000.00 37,200.00 Tukang Batu 0.3500 Oh 75,000.00 26,250.00 Kepala Tukang 0.0350 Oh 95,000.00 3,325.00 Mandor 0.00300 Oh 100,000.00 300.00 Jumlah Pekerja 67,075.00

Jumlah Bahan + Pekerja 166,209.40 Keuntungan Max. 10 % 16,620.94 Jumlah Total 182,830.34 Dibulatkan 182,830.00

Page 97: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 97+29

A.13.76 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM WARNA / CORAK / ANTI SLIPBAHAN :Ubin Keramik 30 x 30 cm Warna/Corak/Anti Slip 12.0000 bh 7,191.67 86,300.00 Semen Portland 8.4000 kg 1,800.00 15,120.00 Pasir Pasang 0.0420 m3 118,200.00 4,964.40 Semen Warna 0.5000 kg 9,100.00 4,550.00 Jumlah Bahan 110,934.40 UPAH :Pekerja 0.6200 Oh 60,000.00 37,200.00 Tukang Batu 0.3500 Oh 75,000.00 26,250.00 Kepala Tukang 0.0350 Oh 95,000.00 3,325.00 Mandor 0.00300 Oh 100,000.00 300.00 Jumlah Pekerja 67,075.00

Jumlah Bahan + Pekerja 178,009.40 Keuntungan Max. 10 % 17,800.94 Jumlah Total 195,810.34 Dibulatkan 195,810.00

A.13.77 1 M2 PASANG LANTAI KERAMIK 40 X 40 CM BAHAN :Ubin Keramik 40 x 40 cm 12.0000 bh 8,275.00 99,300.00 Semen Portland 8.4000 kg 1,800.00 15,120.00 Pasir Pasang 0.0420 m3 118,200.00 4,964.40 Semen Warna 0.5000 kg 9,100.00 4,550.00 Jumlah Bahan 123,934.40 UPAH :Pekerja 0.6200 Oh 60,000.00 37,200.00 Tukang Batu 0.3500 Oh 75,000.00 26,250.00 Kepala Tukang 0.0350 Oh 95,000.00 3,325.00 Mandor 0.00300 Oh 100,000.00 300.00 Jumlah Pekerja 67,075.00

Jumlah Bahan + Pekerja 191,009.40 Keuntungan Max. 10 % 19,100.94 Jumlah Total 210,110.34 Dibulatkan 210,110.00

A.13.78 1 M2 PASANG DINDING KERAMIK 20 X 25 CM, BAHAN :Keramik 20 x 25 cm 20.0000 bh 3,910.00 78,200.00 Semen Abu-abu 8.4000 kg 1,800.00 15,120.00 Pasir Pasang 0.0180 m3 118,200.00 2,127.60 Semen Warna 0.5000 kg 9,100.00 4,550.00 Jumlah Bahan 99,997.60 UPAH :Pekerja 0.6000 Oh 60,000.00 36,000.00 Tukang Batu 0.4500 Oh 75,000.00 33,750.00 Kepala Tukang 0.0450 Oh 95,000.00 4,275.00 Mandor 0.00300 Oh 100,000.00 300.00 Jumlah Pekerja 74,325.00

Jumlah Bahan + Pekerja 174,322.60 Keuntungan Max. 10 % 17,432.26 Jumlah Total 191,754.86 Dibulatkan 191,750.00

A.13.82 1 M2 PASANG PLINT KAYU 2 X 10 CMBAHAN :Kayu Jati Papan 0.0024 m3 14,227,300.00 34,145.52 Paku Skrup 3-5 0.0500 kg 12,300.00 615.00 Jumlah Bahan 34,760.52 UPAH :Pekerja 0.1200 Oh 60,000.00 7,200.00 Tukang Kayu 0.1200 Oh 75,000.00 9,000.00 Kepala Tukang 0.0120 Oh 95,000.00 1,140.00 Mandor 0.0060 Oh 100,000.00 600.00 Jumlah Pekerja 17,940.00

Jumlah Bahan + Pekerja 52,700.52 Keuntungan Max. 10 % 5,270.05 Jumlah Total 57,970.57 Dibulatkan 57,970.00

Page 98: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 98+29

A.13.83 1 M2 PASANGAN PAVING BLOCK WARNA (6 CM)BAHAN :Paving Block Warna 6 cm 1.0100 52,000.00 52,520.00 Pasir Beton 0.1000 m³ 136,400.00 13,640.00 Jumlah Bahan 66,160.00 UPAH :Pekerja 0.2500 org 60,000.00 15,000.00 Tukang Batu 0.5000 org 75,000.00 37,500.00 Kepala Tukang Batu 0.0250 org 95,000.00 2,375.00 Mandor 0.0030 org 100,000.00 300.00 Jumlah Pekerja 55,175.00

Jumlah Bahan + Pekerja 121,335.00 Keuntungan Max. 10 % 12,133.50 Jumlah 133,468.50 Dibulatkan 133,460.00

A.13.84 1 M2 PASANGAN PAVING BLOCK WARNA (8 CM)BAHAN :Paving Block Warna 8 cm 1.0100 54,500.00 55,045.00 Pasir Beton 0.1000 m³ 136,400.00 13,640.00 Jumlah Bahan 68,685.00 UPAH :Pekerja 0.2500 org 60,000.00 15,000.00 Tukang Batu 0.5000 org 75,000.00 37,500.00 Kepala Tukang Batu 0.0250 org 95,000.00 2,375.00 Mandor 0.0030 org 100,000.00 300.00 Jumlah Pekerja 55,175.00

Jumlah Bahan + Pekerja 123,860.00 Keuntungan Max. 10 % 12,386.00 Jumlah 136,246.00 Dibulatkan 136,240.00

A.13.85 1 M2 PASANGAN BATU CANDIBAHAN :Batu Candi 1.0100 95,000.00 95,950.00 Pasir Beton 0.1000 m³ 136,400.00 13,640.00 Jumlah Bahan 109,590.00 UPAH :Pekerja 0.2500 org 60,000.00 15,000.00 Tukang Batu 0.5000 org 75,000.00 37,500.00 Kepala Tukang Batu 0.0250 org 95,000.00 2,375.00 Mandor 0.0030 org 100,000.00 300.00 Jumlah Pekerja 55,175.00

Jumlah Bahan + Pekerja 164,765.00 Keuntungan Max. 10 % 16,476.50 Jumlah 181,241.50 Dibulatkan 181,240.00

A.13.86 1 M2 PASANGAN PAVING BLOCK NATURAL (6 CM)BAHAN :Paving Block Natural 6 cm 1.0100 m² 47,300.00 47,773.00 Pasir Beton 0.1000 m³ 136,400.00 13,640.00 Jumlah Bahan 61,413.00 UPAH :Pekerja 0.2500 org 60,000.00 15,000.00 Tukang Batu 0.5000 org 75,000.00 37,500.00 Kepala Tukang Batu 0.0250 org 95,000.00 2,375.00 Mandor 0.0030 org 100,000.00 300.00 Jumlah Pekerja 55,175.00

Jumlah Bahan + Pekerja 116,588.00 Keuntungan Max. 10 % 11,658.80 Jumlah 128,246.80 Dibulatkan 128,240.00

A.13.87 1 M2 PASANGAN PAVING BLOCK NATURAL (8 CM)BAHAN :Paving Block Natural 8 cm 1.0100 m² 49,100.00 49,591.00 Pasir Beton 0.1000 m³ 136,400.00 13,640.00 Jumlah Bahan 63,231.00 UPAH :Pekerja 0.2500 org 60,000.00 15,000.00 Tukang Batu 0.5000 org 75,000.00 37,500.00 Kepala Tukang Batu 0.0250 org 95,000.00 2,375.00 Mandor 0.0030 org 100,000.00 300.00 Jumlah Pekerja 55,175.00

Jumlah Bahan + Pekerja 118,406.00 Keuntungan Max. 10 % 11,840.60 Jumlah 130,246.60 Dibulatkan 130,240.00

m2

m2

m2

Page 99: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 99+29

A.14.07 1 M2 PENGECATAN BIDANG KAYU LAMABAHAN :Plamir 0.1500 kg 20,000.00 3,000.00 Cat dasar 0.1700 kg 69,100.00 11,747.00 Cat Penutup 0.1700 kg 69,100.00 11,747.00 Jumlah Bahan 26,494.00 UPAH :Pekerja 0.0700 Oh 60,000.00 4,200.00 Tukang Cat 0.0750 Oh 75,000.00 5,625.00 Kepala Tukang 0.0075 Oh 95,000.00 712.50 Mandor 0.0025 Oh 100,000.00 250.00 Jumlah Pekerja 10,787.50

Jumlah Bahan + Pekerja 37,281.50 Keuntungan Max. 10 % 3,728.15 Jumlah Total 41,009.65 Dibulatkan 41,000.00

A.14.08 1 M2 PENGECATAN BIDANG KAYU BARU (1 LAPIS PLAMIR), 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUPBAHAN :Cat Meni 0.2000 kg 69,100.00 13,820.00 Plamir 0.1500 kg 21,800.00 3,270.00 Cat dasar 0.1700 kg 69,100.00 11,747.00 Cat Penutup 0.2600 kg 69,100.00 17,966.00 Jumlah Bahan 46,803.00 UPAH :Pekerja 0.0700 Oh 60,000.00 4,200.00 Tukang Cat 0.0090 Oh 75,000.00 675.00 Kepala Tukang 0.0060 Oh 95,000.00 570.00 Mandor 0.0025 Oh 100,000.00 250.00 Jumlah Pekerja 5,695.00

Jumlah Bahan + Pekerja 52,498.00 Keuntungan Max. 10 % 5,249.80 Jumlah Total 57,747.80 Dibulatkan 57,740.00

A.14.12 1 M2 PELABURAN BIDANG KAYU DENGAN CAT RESIDU DAN TERBAHAN :Residu atau Ter 0.3500 ltr 1,000.00 350.00 Jumlah Bahan 350.00 UPAH :Pekerja 0.1000 Oh 60,000.00 6,000.00 Tukang Cat - Oh 75,000.00 - Kepala Tukang - Oh 95,000.00 - Mandor 0.0060 Oh 100,000.00 600.00 Jumlah Pekerja 6,600.00

Jumlah Bahan + Pekerja 6,950.00 Keuntungan Max. 10 % 695.00 Jumlah Total 7,645.00 Dibulatkan 7,640.00

A.14.14 1 M2 PENGECATAN TEMBOK BARU (1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)BAHAN :Plamir 0.1000 ltr 21,800.00 2,180.00 Cat dasar 0.1000 kg 14,500.00 1,450.00 Cat Penutup 2 x 0.2600 lbr 14,500.00 3,770.00 Jumlah Bahan 7,400.00 UPAH :Pekerja 0.0200 Oh 60,000.00 1,200.00 Tukang Cat 0.0630 Oh 75,000.00 4,725.00 Kepala Tukang 0.0063 Oh 95,000.00 598.50 Mandor 0.0025 Oh 100,000.00 250.00 Jumlah Pekerja 6,773.50

Jumlah Bahan + Pekerja 14,173.50 Keuntungan Max. 10 % 1,417.35 Jumlah Total 15,590.85 Dibulatkan 15,590.00

Page 100: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 100+29

A.14.15 1 M2 PENGECATAN TEMBOK LAMA (1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)BAHAN :Cat dasar 0.1200 kg 14,500.00 1,740.00 Cat Penutup 2 x 0.1800 lbr 14,500.00 2,610.00 Jumlah Bahan 4,350.00 UPAH :Pekerja 0.0280 Oh 60,000.00 1,680.00 Tukang Cat 0.0420 Oh 75,000.00 3,150.00 Kepala Tukang 0.0042 Oh 95,000.00 399.00 Mandor 0.0025 Oh 100,000.00 250.00 Jumlah Pekerja 5,479.00

Jumlah Bahan + Pekerja 9,829.00 Keuntungan Max. 10 % 982.90 Jumlah Total 10,811.90 Dibulatkan 10,810.00

A.14.19 1 M2 PEMASANGAN WALL PAPERBAHAN :Walpapaer 1.2000 m3 - Perekat 0.2000 kg - Jumlah Bahan - UPAH :Pekerja 0.0200 Oh 60,000.00 1,200.00 Tukang Cat 0.2000 Oh 75,000.00 15,000.00 Kepala Tukang 0.0020 Oh 95,000.00 190.00 Mandor 0.0025 Oh 100,000.00 250.00 Jumlah Pekerja 16,640.00

Jumlah Bahan + Pekerja 16,640.00 Keuntungan Max. 10 % 1,664.00 Jumlah Total 18,304.00 Dibulatkan 18,300.00

A.14.21 1 M2 PLITURAN BIDANG KAYU (BIASA)BAHAN :Dempul plitur (dempul kasar) 0.0300 kg 5,000.00 150.00 Wood Filer (INFRA) 0.2000 kg 49,600.00 9,920.00 Oker putih 0.0200 kg 52,700.00 1,054.00 Oker warna 0.0100 kg 52,700.00 527.00 Batu Apung (gosok) 0.1000 kg 17,700.00 1,770.00 Sirlak ex India 0.2000 kg 29,100.00 5,820.00 Kwas 3" 0.0100 bh 17,700.00 177.00 Spirtus 0.2000 ltr 14,900.00 2,980.00 Ampelas kayu 0.1000 lbr 3,600.00 360.00 Jumlah Bahan 22,758.00 UPAH :Pekerja 0.2500 org 60,000.00 15,000.00 Tk. Cat/Plitur 0.0285 org 75,000.00 2,137.50 Kep. tukang cat/plitur 0.0040 org 95,000.00 380.00 Mandor 0.0020 org 100,000.00 200.00 Jumlah Pekerja 17,717.50

Jumlah Bahan + Pekerja 40,475.50 Keuntungan Max. 10 % 4,047.55 Jumlah Total 44,523.05 Dibulatkan 44,520.00

A.14.24 1 M2 PENGECATAN PLAFOND DAN DINDING (INTERIOR ICI) BAHAN :Cat tembok ICI / Sekelasnya 0.2500 lt 37,200.00 9,300.00 Cat dasar sebelum pengecatan 0.1250 lt 120,500.00 15,062.50 Rol cat 0.0100 bh 37,200.00 372.00 Ampelas 0.5000 lbr 3,600.00 1,800.00 Jumlah Bahan 26,534.50 UPAH :Pekerja 0.2000 org 60,000.00 12,000.00 Tk. cat 0.3000 org 75,000.00 22,500.00 Kep. tukang cat 0.0300 org 95,000.00 2,850.00 Mandor 0.0100 org 100,000.00 1,000.00 Jumlah Pekerja 38,350.00

Jumlah Bahan + Pekerja 64,884.50 Keuntungan Max. 10 % 6,488.45 Jumlah 71,372.95 Dibulatkan 71,370.00

Page 101: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 101+29

A.14.25 1 M2 PENGECATAN DINDING SEKELAS VINILEX (3x)BAHAN :Cat tembok Vinilex / Sekelas Vinilex 0.1750 kg 20,900.00 3,657.50 Plamir tembok 0.1600 kg 21,800.00 3,488.00 Rol cat 0.0100 bh 37,200.00 372.00 Ampelas 0.5000 lbr 3,600.00 1,800.00 Jumlah Bahan 9,317.50 UPAH :Pekerja 0.1040 org 60,000.00 6,240.00 Tk. cat 0.0182 org 75,000.00 1,365.00 Kep. tukang cat 0.0090 org 95,000.00 855.00 Mandor 0.0045 org 100,000.00 450.00 Jumlah Pekerja 8,910.00

Jumlah Bahan + Pekerja 18,227.50 Keuntungan Max. 10 % 1,822.75 Jumlah 20,050.25 Dibulatkan 20,050.00

A.14.26 1 M2 PENGECATAN PLAFOND SEKELAS VINILEX (3x)BAHAN :Cat tembok Vinilex / Sekelas Vinilex 0.2000 kg 20,900.00 4,180.00 Plamir tembok 0.1600 kg 21,800.00 3,488.00 Rol cat 0.0100 bh 37,200.00 372.00 Ampelas 0.5000 lbr 3,600.00 1,800.00 Jumlah Bahan 9,840.00 UPAH :Pekerja 0.2000 org 60,000.00 12,000.00 Tk. cat 0.0280 org 75,000.00 2,100.00 Kep. tukang cat 0.0150 org 95,000.00 1,425.00 Mandor 0.0090 org 100,000.00 900.00 Jumlah Pekerja 16,425.00

Jumlah Bahan + Pekerja 26,265.00 Keuntungan Max. 10 % 2,626.50 Jumlah 28,891.50 Dibulatkan 28,890.00

A.14.28 1 M2 PENGECATAN DINDING SEKELAS SANLEX (3x)BAHAN :Cat tembok Sanlex / Sekelas Sanlex 0.1750 kg 14,500.00 2,537.50 Plamir tembok 0.1600 kg 21,800.00 3,488.00 Rol cat 0.0100 bh 37,200.00 372.00 Ampelas 0.5000 lbr 3,600.00 1,800.00 Jumlah Bahan 8,197.50 UPAH :Pekerja 0.1040 org 60,000.00 6,240.00 Tk. cat 0.0182 org 75,000.00 1,365.00 Kep. tukang cat 0.0090 org 95,000.00 855.00 Mandor 0.0045 org 100,000.00 450.00 Jumlah Pekerja 8,910.00

Jumlah Bahan + Pekerja 17,107.50 Keuntungan Max. 10 % 1,710.75 Jumlah 18,818.25 Dibulatkan 18,810.00

A.14.29 1 M2 PENGECATAN PLAFOND SEKELAS SANLEX (3x)BAHAN :Cat tembok Sanlex / Sekelas Sanlex 0.2000 kg 14,500.00 2,900.00 Plamir tembok 0.1600 kg 21,800.00 3,488.00 Rol cat 0.0100 bh 37,200.00 372.00 Ampelas 0.5000 lbr 3,600.00 1,800.00 Jumlah Bahan 8,560.00 UPAH :Pekerja 0.2000 org 60,000.00 12,000.00 Tk. cat 0.0280 org 75,000.00 2,100.00 Kep. tukang cat 0.0150 org 95,000.00 1,425.00 Mandor 0.0090 org 100,000.00 900.00 Jumlah Pekerja 16,425.00

Jumlah Bahan + Pekerja 24,985.00 Keuntungan Max. 10 % 2,498.50 Jumlah 27,483.50 Dibulatkan 27,480.00

Page 102: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 102+29

A.14.30 1 M2 PENGECATAN BIDANG KAYU (3X) BERIKUT MENIBAHAN :Meni kayu 0.1670 kg 28,400.00 4,742.80 Plamir kayu 0.0830 kg 20,000.00 1,660.00 Cat kayu sekelas SEIV 0.2000 kg 80,000.00 16,000.00 Amplas kayu 0.4000 lbr 3,600.00 1,440.00 Minyak cat terpentin 0.1500 ltr 7,100.00 1,065.00 Kwas 3" 0.0500 bh 17,700.00 885.00 Jumlah Bahan 25,792.80 UPAH :Pekerja 0.2000 org 60,000.00 12,000.00 Tk. Cat 0.0600 org 75,000.00 4,500.00 Kep. tukang cat 0.0300 org 95,000.00 2,850.00 Mandor 0.0100 org 100,000.00 1,000.00 Jumlah Pekerja 20,350.00

Jumlah Bahan + Pekerja 46,142.80 Keuntungan Max. 10 % 4,614.28 Jumlah 50,757.08 Dibulatkan 50,750.00

A.14.31 1 M2 PENGECATAN BESI (3X)BAHAN :Meni besi 0.1670 kg 28,400.00 4,742.80 Cat besi sekelas Seiv 0.2000 kg 76,800.00 15,360.00 Amplas besi 0.4000 lbr 3,600.00 1,440.00 Minyak cat / thiner B 0.1500 ltr 30,000.00 4,500.00 Kwas 3" 0.0500 bh 17,700.00 885.00 Jumlah Bahan 26,927.80 UPAH :Pekerja 0.2000 org 70,000.00 14,000.00 Tk. Cat 0.0600 org 90,000.00 5,400.00 Kep. tukang cat 0.0300 org 95,000.00 2,850.00 Mandor 0.0100 org 100,000.00 1,000.00 Jumlah Pekerja 23,250.00

Jumlah Bahan + Pekerja 50,177.80 Keuntungan Max. 10 % 5,017.78 Jumlah 55,195.58 Dibulatkan 55,190.00

A.14.32 1 M2 PENGECATAN BIDANG KAYU LAMA BERCATBAHAN :Ampelas Kayu 0.2500 lbr 3,600.00 900.00 Cat kayu sekelas SEIV 0.1700 kg 80,000.00 13,600.00 Kwas 3" 0.0500 bh 17,700.00 885.00 Jumlah Bahan 15,385.00 UPAH :Pembantu Tukang 0.2000 org 60,000.00 12,000.00 Tk. Cat 0.0750 org 75,000.00 5,625.00 Kep. tukang cat 0.0300 org 95,000.00 2,850.00 Mandor 0.0100 org 100,000.00 1,000.00 Jumlah Pekerja 21,475.00

Jumlah Bahan + Pekerja 36,860.00 Keuntungan Max. 10 % 3,686.00 Jumlah 40,546.00 Dibulatkan 40,540.00

A.14.33 1 M2 PENGECATAN DINDING (LAMA) BAHAN :Cat Tembok sekelas Sanlex 0.1700 Kg 14,500.00 2,465.00 Roll Cat 0.0100 bh 37,200.00 372.00 Ampelas 0.2500 lbr 3,600.00 900.00 Jumlah Bahan 3,737.00 UPAH :Pembantu Tukang 0.0700 org 60,000.00 4,200.00 Tk. Cat 0.0750 org 75,000.00 5,625.00 Kep. tukang cat 0.0075 org 95,000.00 712.50 Mandor 0.0025 org 100,000.00 250.00 Jumlah Pekerja 10,787.50

Jumlah Bahan + Pekerja 14,524.50 Keuntungan Max. 10 % 1,452.45 Jumlah 15,976.95 Dibulatkan 15,970.00

Page 103: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 103+29

A002 1 M1 PEK. PASANGAN BOUWPLANKKayu Albasiah 0.0100 m³ 2,009,100.00 20,091.00 Paku 4 - 7 0.0380 kg 16,400.00 623.20 Ongkos Pasang 0.1550 ls 20,714.20 3,210.70 Jumlah 23,924.90 Keuntungan Max. 2,392.49 Jumlah 26,317.39 Dibulatkan 26,310.00

A003 1 M2 LOS KERJA / GUDANGKayu Albasiah 0.1000 m³ 2,009,100.00 200,910.00 Paku 4 - 7 0.2500 kg 16,400.00 4,100.00 Seng Glb BJLS 30 1.1000 lbr 49,600.00 54,560.00 Triplex 3 mm 0.5000 lbr 91,700.00 45,850.00 PC (50 kg) 0.1000 zak 90,900.00 9,090.00 Peralatan 0.0250 lot 314,510.00 7,862.75 Ongkos Pasang 0.1250 ls 322,372.75 40,296.59 Jumlah 362,669.34 Keuntungan Max. 10 % 36,266.93 Jumlah 398,936.28 Dibulatkan 398,930.00

A004 1 M2 PEK. KANTOR DIREKSIKayu Albasiah 0.1000 m³ 2,009,100.00 200,910.00 Paku 4 - 7 0.2500 kg 16,400.00 4,100.00 Seng Glb BJLS 28 ( 80 x 180 cm ) 1.1000 lbr 23,900.00 26,290.00 Triplex 3 mm 0.5000 lbr 91,700.00 45,850.00 PC (50 kg) 0.1000 zak 90,900.00 9,090.00 Pasir pasang 0.2500 m³ 118,200.00 29,550.00 Bata merah 70.0000 bh 400.00 28,000.00 Peralatan 0.0200 lot 343,790.00 6,875.80 Ongkos Pasang 0.1500 ls 343,790.00 51,568.50 Jumlah 402,234.30 Keuntungan Max. 10 % 40,223.43 Jumlah 442,457.73 Dibulatkan 442,450.00

A005 1 M2 PAPAN NAMA PROYEKKayu Albasiah 0.1300 m³ 2,009,100.00 261,183.00 Paku 4 - 7 0.2500 kg 16,400.00 4,100.00 Pengecatan Kayu 1.0000 ls 20,350.00 20,350.00 Penulisan 0.1250 ls 285,633.00 35,704.13 Ongkos Pasang 0.1250 ls 321,337.13 40,167.14 Jumlah 361,504.27 Keuntungan Max. 10 % 36,150.43 Jumlah 397,654.69 Dibulatkan 397,650.00

A006 1 M2 PAGAR PENGAMAN PROYEKSeng Glb BJLS 28 ( 80 x 180 ) 1.4300 lbr 23,900.00 34,177.00 Kayu Albasiah 0.0360 m³ 2,000,000.00 72,000.00 Paku 4 - 7 0.2000 kg 16,400.00 3,280.00 Pengecatan cat minyak 2x bag. luar 1.8000 m² 15,500.00 27,900.00 Ongkos Pasang 0.2000 ls 137,357.00 27,471.40 Jumlah 164,828.40 Keuntungan Max. 10 % 16,482.84 Jumlah 181,311.24 Dibulatkan 181,310.00

A007 1 M3 PEK.GALIAN TANAH BIASA MAX KEDALAMAN 1 M'Tukang Gali 0.4000 org 70,000.00 28,000.00 Mandor 0.0400 org 100,000.00 4,000.00 Alat Bantu 0.0500 lot 32,000.00 1,600.00 Jumlah 33,600.00 Keuntungan Max. 10 % 3,360.00 Jumlah 36,960.00 Dibulatkan 36,960.00

Page 104: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 104+29

A008 1 M3 PEK.GALIAN TANAH BIASA MAX KEDALAMAN 2 M'Tukang Gali 0.5260 org 70,000.00 36,820.00 Mandor 0.0520 org 100,000.00 5,200.00 Alat Bantu 0.0500 lot 42,020.00 2,101.00 Jumlah 44,121.00 Keuntungan Max. 10 % 4,412.10 Jumlah 48,533.10 Dibulatkan 48,530.00

A009 1 M3 PEK.GALIAN TANAH BIASA MAX KEDALAMAN 3 M'Tukang Gali 0.7350 org 70,000.00 51,450.00 Mandor 0.0730 org 100,000.00 7,300.00 Alat Bantu 0.0500 lot 58,750.00 2,937.50 Jumlah 61,687.50 Keuntungan Max. 10 % 6,168.75 Jumlah 67,856.25 Dibulatkan 67,850.00

A010 1 M3 PEK.GALIAN TANAH BIASA MAX KEDALAMAN 4 M'Tukang Gali 0.9440 org 70,000.00 66,080.00 Mandor 0.0940 org 100,000.00 9,400.00 Alat Bantu 0.0500 lot 75,480.00 3,774.00 Jumlah 79,254.00 Keuntungan Max. 10 % 7,925.40 Jumlah 87,179.40 Dibulatkan 87,170.00

A011 1 M3 PEK.GALIAN TANAH BIASA KEDALAMAN 5 M1Tukang Gali 1.1530 org 70,000.00 80,710.00 Mandor 0.1150 org 100,000.00 11,500.00 Alat Bantu 0.0500 lot 92,210.00 4,610.50 Jumlah 96,820.50 Keuntungan Max. 10 % 9,682.05 Jumlah 106,502.55 Dibulatkan 106,500.00

A012 1 M3 PEK.GALIAN TANAH BERBATU / TANAH KERAS MAX KEDALAMAN 1 MTukang Gali 0.6250 org 70,000.00 43,750.00 Mandor 0.1250 org 100,000.00 12,500.00 Alat Bantu 0.2500 lot 56,250.00 14,062.50 Jumlah 70,312.50 Keuntungan Max. 10 % 7,031.25 Jumlah 77,343.75 Dibulatkan 77,340.00

A013 1 M3 PEK.GALIAN TANAH CADAS MAX KEDALAMAN 1 MTukang Gali 0.7500 org 70,000.00 52,500.00 Mandor 0.1250 org 100,000.00 12,500.00 Alat Bantu 0.2500 lot 65,000.00 16,250.00 Jumlah 81,250.00 Keuntungan Max. 10 % 8,125.00 Jumlah 89,375.00 Dibulatkan 89,370.00

A014 1 M3 PEK.GALIAN TANAH LUMPUR MAX KEDALAMAN 1 MTukang Gali 0.5250 org 70,000.00 36,750.00 Mandor 0.1250 org 100,000.00 12,500.00 Alat Bantu 0.2500 lot 49,250.00 12,312.50 Jumlah 61,562.50 Keuntungan Max. 10 % 6,156.25 Jumlah 67,718.75 Dibulatkan 67,710.00

A015 1 M2 PEK. STRIPING TANAH TEBAL = 20 CMTukang Gali 0.0500 org 70,000.00 3,500.00 Mandor 0.0050 org 100,000.00 500.00 Alat Bantu 0.3500 lot 4,000.00 1,400.00 Jumlah 5,400.00 Keuntungan Max. 10 % 540.00 Jumlah 5,940.00 Dibulatkan 5,940.00

A016 1 M3 PEK. PEMBUANGAN DALAM RADIUS 150 METERTukang Gali 0.2500 org 70,000.00 17,500.00 Mandor 0.0500 org 100,000.00 5,000.00 Alat Bantu 0.1000 lot 22,500.00 2,250.00 Jumlah 24,750.00 Keuntungan Max. 10 % 2,475.00 Jumlah 27,225.00 Dibulatkan 27,220.00

Page 105: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 105+29

A017 1 M3 URUGAN TANAH KEMBALI Tukang Gali 0.1920 org 70,000.00 13,440.00 Mandor 0.0190 org 100,000.00 1,900.00 Alat Bantu 0.1000 lot 15,340.00 1,534.00 Jumlah 16,874.00 Keuntungan Max. 10 % 1,687.40 Jumlah 18,561.40 Dibulatkan 18,560.00

A018 1 M3 PEK. PEMADATAN TANAH SETIAP 20 CM Tukang Gali 0.3000 org 70,000.00 21,000.00 Mandor 0.0300 org 100,000.00 3,000.00 Alat Bantu ( Sewa Stamper ) 0.1250 lot 24,000.00 3,000.00 Jumlah 27,000.00 Keuntungan Max. 10 % 2,700.00 Jumlah 29,700.00 Dibulatkan 29,700.00

A019 1 M3 PEK. LAPISAN PUDEL 1 KP : 3 TS : 7 TLPasir Pasang 0.3300 m³ 118,200.00 39,006.00 Kapur Padam 0.1000 m³ 161,300.00 16,130.00 Tanah liat 0.7630 m³ 52,700.00 40,210.10 Tukang Gali 0.8330 org 70,000.00 58,310.00 Tk.batu setengah terampil 0.4160 org 75,000.00 31,200.00 Kep.tukang batu 0.0400 org 95,000.00 3,800.00 Mandor 0.0083 org 100,000.00 830.00 Jumlah 189,486.10 Keuntungan Max. 10 % 18,948.61 Jumlah 208,434.71 Dibulatkan 208,430.00

A020 1 M3 PEK. LAPISAN PUDEL 1 KP : 5 TLKapur Padam 0.2000 m³ 161,300.00 32,260.00 Tanah liat 1.0000 m³ 52,700.00 52,700.00 Tukang Gali 0.8330 org 70,000.00 58,310.00 Tk.batu setengah terampil 0.4160 org 75,000.00 31,200.00 Kep.tukang batu 0.4100 org 95,000.00 38,950.00 Mandor 0.0830 org 100,000.00 8,300.00 Jumlah 221,720.00 Keuntungan Max. 10 % 22,172.00 Jumlah 243,892.00 Dibulatkan 243,890.00

A021 1 M3 PEK. LAPISAN PUDEL 1 KP : 5 TSPasir Pasang 1.0000 m³ 118,200.00 118,200.00 Kapur Padam 0.2000 m³ 161,300.00 32,260.00 Tukang Gali 0.8330 org 70,000.00 58,310.00 Tk.batu setengah terampil 0.4160 org 75,000.00 31,200.00 Kep.tukang batu 0.0410 org 95,000.00 3,895.00 Mandor 0.0830 org 100,000.00 8,300.00 Jumlah 252,165.00 Keuntungan Max. 10 % 25,216.50 Jumlah 277,381.50 Dibulatkan 277,380.00

A022 1 M2 PEK. PEMASANGAN LAPISAN INJUK T = 10 CMInjuk 6.0000 kg 21,800.00 130,800.00 Pekerja 0.1500 org 60,000.00 9,000.00 Mandor 0.0150 org 100,000.00 1,500.00 Jumlah 141,300.00 Keuntungan Max. 10 % 14,130.00 Jumlah 155,430.00 Dibulatkan 155,430.00

A023 1 M3 PEK. PERKERASAN SIRTU DIPADATKAN SETIAP 20 CMSirtu ( Membeli Sirtu ) 1.2000 m³ 148,900.00 178,680.00 Tukang Gali 0.2500 org 70,000.00 17,500.00 Mandor 0.0250 org 100,000.00 2,500.00 Alat Bantu ( Pek. Pemadatan Tanah 1 m3 ) 0.1000 lot 198,680.00 19,868.00 Jumlah 218,548.00 Keuntungan Max. 10 % 21,854.80 Jumlah 240,402.80 Dibulatkan 240,400.00

Page 106: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 106+29

A024 1 M2 PEK. PEMBUATAN JALAN SEMENTARA TEBAL 20 CMBatu Belah 0.2500 m³ 154,500.00 38,625.00 Kerikil ( batu koral hitam / kali ) 0.0300 m³ 228,200.00 6,846.00 Pasir Pasang 0.0500 m³ 118,200.00 5,910.00 Tukang Gali 0.5000 org 70,000.00 35,000.00 Mandor 0.1000 org 100,000.00 10,000.00 Alat Bantu ( Pek. Pemadatan Tanah 1 m2 ) 0.0600 lot 96,381.00 5,782.86 Jumlah 102,163.86 Keuntungan Max. 10 % 10,216.39 Jumlah 112,380.25 Dibulatkan 112,380.00

A025 1 M3 PEK.GALIAN TANAH SUMURAN MAX KEDALAMAN 10 M'Tukang Gali 1.1500 org 70,000.00 80,500.00 Mandor 0.0250 org 100,000.00 2,500.00 Alat Bantu 0.2000 lot 83,000.00 16,600.00 Jumlah 99,600.00 Keuntungan Max. 10 % 9,960.00 Jumlah 109,560.00 Dibulatkan 109,560.00

A026 1 M3 URUGAN PAKAI ALAT BESAR TANAH DARI LUAR DIPADATKAN (5000M3)Pek. Galian ( 10 org ) 50 % 0.6000 m³ 44,121.00 13,236.30 Pek. Galian tanah berbatu ( 10 org ) 50 % 0.6000 m³ 70,312.50 21,093.75 Pek. Grading Plant ( 10 org ) 50 % 5.0000 m² 5,400.00 13,500.00 Beli Tanah + Angkut Max 10 Km 1.2000 m³ 4,000.00 4,800.00 Jumlah 52,630.05 Keuntungan Max. 10 % 5,263.01 Jumlah 57,893.06 Dibulatkan 57,890.00

A027 1 M3 URUGAN PASIR URUGPasir Urug 1.2000 m³ 100,000.00 120,000.00 Pekerja 0.1500 org 60,000.00 9,000.00 Mandor 0.0100 org 100,000.00 1,000.00 Jumlah 130,000.00 Keuntungan Max. 10 % 13,000.00 Jumlah 143,000.00 Dibulatkan 143,000.00

A027 Rob 1 M3 PENIMBUNAN TANAH DIPADATKAN (TANAH DARI LUAR)Tanah Urug (didatangkan) 1.2000 m³ 11,800.00 14,160.00 Tukang Gali 0.4500 org 70,000.00 31,500.00 Mandor 0.0450 org 100,000.00 4,500.00 Alat Bantu (sewa stamper) 0.1250 lot 45,660.00 5,707.50 Jumlah 55,867.50 Keuntungan Max. 10 % 5,586.75 Jumlah 61,454.25 Dibulatkan 61,450.00

A028 1 M3 LANTAI KERJA 1 PC : 3 PS : 5 KRL(dengan Split 2/3)PC (50 kg) 218.0000 kg 1,800.00 392,400.00 Pasir pasang 0.5200 m³ 118,200.00 61,464.00 Split Pecah mesin 2/3 0.8700 m³ 272,700.00 237,249.00 Pekerja 1.6500 org 60,000.00 99,000.00 Tk. Batu Setengah Terampil 0.2500 org 75,000.00 18,750.00 Kep. Tukang Batu 0.0250 org 95,000.00 2,375.00 Mandor 0.0800 org 100,000.00 8,000.00 Peralatan 0.0750 lot 128,125.00 9,609.38 Jumlah 828,847.38 Keuntungan Max. 10 % 82,884.74 Jumlah 911,732.11 Dibulatkan 911,730.00

Page 107: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 107+29

400.02.1 1 M3 Membuat Plat Beton Bertulang (211,909 Kg Besi + Bekesting)Bekesting Albasiah 0.2450 m³ 2,009,100.00 492,229.50 Paku 5 - 7 cm 1.5000 kg 16,400.00 24,600.00 Pelumas Bekesting 0.4000 lt 36,600.00 14,640.00 Besi Beton Polos U 24 211.9090 kg 14,500.00 3,072,680.50 Kawat Beton 2.2500 kg 15,500.00 34,875.00 Semen Portland ( PC. ) 6.4600 zak 90,900.00 587,214.00 Pasir Beton 0.5200 m³ 136,400.00 70,928.00 Batu Pecah 2/3 0.7800 m³ 272,700.00 212,706.00 Tukang Batu 0.3500 org 90,000.00 31,500.00 Tukang Kayu 1.0400 org 90,000.00 93,600.00 Tukang Besi 1.0500 org 90,000.00 94,500.00 Kepala Tukang 0.2450 org 95,000.00 23,275.00 Pembantu Tukang 3.9000 org 60,000.00 234,000.00 Mandor 0.1650 org 100,000.00 16,500.00 Jumlah 5,003,248.00 Keuntungan Max. 10 % 500,324.80 Jumlah 5,503,572.80 Dibulatkan 5,503,570.00

A029 1 M3 PAS. BETON CYCLOOF + 40% BATU BELAHBatu Belah 40% 0.4800 m³ 154,500.00 74,160.00 Adukan Beton Tumbuk 1:3:5 0.6000 m³ 828,847.38 497,308.43 Upah Kerja 0.0400 ls 571,468.43 22,858.74 Jumlah 594,327.16 Keuntungan Max. 10 % 59,432.72 Jumlah 653,759.88

Dibulatkan 653,750.00 A030 1 M3 COR BETON SITE MIX K 175

Semen PC (50 kg) 6.8000 zak 90,900.00 618,120.00 Split pecah mesin 2/3 0.8300 m³ 272,700.00 226,341.00 Pasir Beton 0.5400 m³ 136,400.00 73,656.00 Pekerja 1.5000 org 60,000.00 90,000.00 Tukang batu setengah terampil 0.5000 org 75,000.00 37,500.00 Kep. tukang batu 0.0500 org 95,000.00 4,750.00 Mandor 0.0100 org 100,000.00 1,000.00 Peralatan 0.0700 lot 1,051,367.00 73,595.69 Jumlah 1,124,962.69 Keuntungan Max. 10 % 112,496.27 Jumlah 1,237,458.96 Dibulatkan 1,237,450.00

A031 1 M3 COR BETON SITE MIX K 225Semen PC (50 kg) 7.8960 zak 90,900.00 717,746.40 Split pecah mesin 2/3 0.8100 m³ 272,700.00 220,887.00 Pasir beton 0.4900 m³ 136,400.00 66,836.00 Pekerja 1.5000 org 60,000.00 90,000.00 Tk.batu setengah terampil 0.5000 org 75,000.00 37,500.00 Kepala tk. batu 0.0500 org 95,000.00 4,750.00 Mandor 0.0100 org 100,000.00 1,000.00 Peralatan 0.0700 lot 1,138,719.40 79,710.36 Jumlah 1,218,429.76 Keuntungan Max. 10 % 121,842.98 Jumlah 1,340,272.73 Dibulatkan 1,340,270.00

A032 1 M3 COR BETON SITE MIX K 300Semen PC (50 kg) 8.6960 zak 90,900.00 790,466.40 Split pecah mesin 2/3 0.8100 m³ 272,700.00 220,887.00 Pasir beton 0.4900 m³ 136,400.00 66,836.00 Pekerja 1.5000 org 60,000.00 90,000.00 Tk.batu setengah terampil 0.5000 org 75,000.00 37,500.00 Kepala tk. batu 0.0500 org 95,000.00 4,750.00 Mandor 0.0100 org 100,000.00 1,000.00 Peralatan 0.7000 lot 1,211,439.40 848,007.58 Jumlah 2,059,446.98 Keuntungan Max. 10 % 205,944.70 Jumlah 2,265,391.68 Dibulatkan 2,265,390.00

Page 108: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 108+29

A033 1 M3 COR BETON K-175 READY MIX MIN 6 M3 BERIKUT SLANGAdukan K-175 Readymix 1.0000 m³ 898,200.00 898,200.00 Pekerja 2.5000 org 60,000.00 150,000.00 Tukang batu setengah terampil 0.2500 org 75,000.00 18,750.00 Kep. tukang batu 0.1000 org 95,000.00 9,500.00 Mandor 0.0100 org 100,000.00 1,000.00 Alat bantu (Slang + Tes Lab) 0.0450 lot 1,077,450.00 48,485.25 Jumlah 1,125,935.25 Keuntungan Max. 10 % 112,593.53 Jumlah 1,238,528.78 Dibulatkan 1,238,520.00

A034 1 M3 COR BETON K-225 READY MIX MIN 6 M3 BERIKUT SLANGAdukan K-225 Readymix 1.0000 m³ 1,040,000.00 1,040,000.00 Pekerja 2.5000 org 60,000.00 150,000.00 Tukang batu setengah terampil 0.2500 org 75,000.00 18,750.00 Kep. tukang batu 0.1000 org 95,000.00 9,500.00 Mandor 0.0100 org 100,000.00 1,000.00 Alat bantu (Slang + Tes Lab) 0.0450 lot 1,219,250.00 54,866.25 Jumlah 1,274,116.25 Keuntungan Max. 10 % 127,411.63 Jumlah 1,401,527.88 Dibulatkan 1,401,520.00

A035 1 M3 COR BETON K-300 READY MIX MIN 6 M3 BERIKUT SLANGAdukan K-300 Readymix 1.0000 m³ 1,229,100.00 1,229,100.00 Pekerja 2.5000 org 60,000.00 150,000.00 Tukang batu setengah terampil 0.2500 org 75,000.00 18,750.00 Kep. tukang batu 0.1000 org 95,000.00 9,500.00 Mandor 0.0100 org 100,000.00 1,000.00 Alat bantu (Slang + Tes Lab) 0.0450 lot 1,408,350.00 63,375.75 Jumlah 1,471,725.75 Keuntungan Max. 10 % 147,172.58 Jumlah 1,618,898.33 Dibulatkan 1,618,890.00

A036 1 KG BESI BETON TERPASANG U - 24Besi Beton rata - rata 1.0500 kg 14,500.00 15,225.00 Kawat Beton 0.0100 kg 15,500.00 155.00 Tk. Besi Beton setengah terampil 0.0250 org 75,000.00 1,875.00 Tk. Besi Beton terampil 0.0150 org 90,000.00 1,350.00 Kepala Tukang Besi terampil 0.0100 org 95,000.00 950.00 Mandor 0.0050 org 100,000.00 500.00 Peralatan, Spancer 0.0200 lot 20,055.00 401.10 Jumlah 20,456.10 Keuntungan Max. 10 % 2,045.61 Jumlah 22,501.71 Dibulatkan 22,500.00

A037 1 KG BESI BETON TERPASANG U - 39Besi Beton rata - rata U - 39 1.0500 kg 16,400.00 17,220.00 Kawat Beton 0.0100 kg 15,500.00 155.00 Tk. Besi Beton setengah terampil 0.0360 org 75,000.00 2,700.00 Tk. Besi Beton terampil 0.0160 org 90,000.00 1,440.00 Kepala Tukang Besi terampil 0.0110 org 95,000.00 1,045.00 Mandor 0.0050 org 100,000.00 500.00 Peralatan, Spancer 0.0200 lot 23,060.00 461.20 Jumlah 23,521.20 Keuntungan Max. 10 % 2,352.12 Jumlah 25,873.32 Dibulatkan 25,870.00

A046 1 M2 BEKISTING DENGAN PAPANKayu Lokal Kelas II 0.0170 m³ 3,545,500.00 30,136.75 Papan terentang ( 2X pakai ) 75 % Kayu Albasiah 0.0240 m³ 2,009,100.00 36,163.80 Paku 0.4000 kg 16,400.00 6,560.00 Pekerja 0.1200 org 60,000.00 7,200.00

Tk. Kayu terampil 0.1500 org 90,000.00 13,500.00 Kepala Tukang Kayu 0.1500 org 95,000.00 14,250.00 Mandor 0.0500 org 100,000.00 5,000.00 Tk. Kayu 1/2 terampil (bongkar cetakan) 0.1200 org 75,000.00 9,000.00 Jumlah 121,810.55 Keuntungan Max. 10 % 12,181.06 Jumlah 133,991.61 Dibulatkan 133,990.00

Page 109: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 109+29

A047 1 M2 BEKISTING MULTIPLEX 9 MMKayu Lokal Kelas II 0.0170 m³ 3,545,500.00 30,136.75 Multiplek 9 mm ( 2 x pakai ) 75% 0.3470 lbr 213,900.00 55,667.47

Paku 0.4000 kg 16,400.00 6,560.00 Pekerja 0.1200 org 60,000.00 7,200.00 Tk. Kayu terampil 0.1500 org 90,000.00 13,500.00 Kepala Tukang Kayu 0.1500 org 95,000.00 14,250.00 Mandor 0.0500 org 100,000.00 5,000.00 Tk. Kayu 1/2 terampil (bongkar cetakan) 0.1200 org 75,000.00 9,000.00 Jumlah 141,314.22 Keuntungan Max. 10 % 14,131.42 Jumlah 155,445.65 Dibulatkan 155,440.00

A048 1 M2 BEKISTING MULTIPLEX 12 MMKayu Lokal Kelas II 0.0170 m³ 3,545,500.00 30,136.75 Multiplek 12 mm ( 2 x pakai ) 75% 0.3470 lbr 285,300.00 74,249.33 Paku 0.4000 kg 16,400.00 6,560.00 Pekerja 0.1200 org 60,000.00 7,200.00 Tk. Kayu terampil 0.1500 org 90,000.00 13,500.00 Kepala Tukang Kayu 0.1500 org 95,000.00 14,250.00 Mandor 0.0500 org 100,000.00 5,000.00 Tk. Kayu 1/2 terampil (bongkar cetakan) 0.1200 org 75,000.00 9,000.00 Jumlah 159,896.08 Keuntungan Max. 10 % 15,989.61 Jumlah 175,885.68 Dibulatkan 175,880.00

A049 1 M2 PASANGAN STOOT WERKKayu stoot ( dinding 2x pakai ) 50% 9.0000 bt 47,300.00 212,850.00 Papan Albasiah ( 2X pakai ) 0.0160 m³ 2,009,100.00 32,145.60 Paku 0.5000 kg 16,400.00 8,200.00 Pekerja 0.1500 org 60,000.00 9,000.00 Tk. Kayu terampil 0.2000 org 90,000.00 18,000.00 Kepala tukang Kayu 0.2000 org 95,000.00 19,000.00 Mandor 0.0170 org 100,000.00 1,700.00 Jumlah 300,895.60 Keuntungan Max. 10 % 30,089.56 Jumlah 330,985.16 Dibulatkan 330,980.00

A050 1 M3 PASANGAN ANSTAMPING BATU BELAHBatu Belah 1.2000 m³ 154,500.00 185,400.00 Pasir Urug 0.1000 m³ 100,000.00 10,000.00 Pekerja 0.5000 org 60,000.00 30,000.00 Tk.batu setengah terampil 0.5625 org 75,000.00 42,187.50 Kep.tukang batu 0.0750 org 95,000.00 7,125.00 Mandor 0.0563 org 100,000.00 5,630.00 Jumlah 280,342.50 Keuntungan Max. 10 % 28,034.25 Jumlah 308,376.75 Dibulatkan 308,370.00

A051 1 M3 PASANGAN BATU BRONJONGBatu Kali ( Batu Bulat ) Bronjol 1.2000 m³ 141,800.00 170,160.00 Kawat Bronjong 3.5000 kg 12,300.00 43,050.00 Pekerja 1.5000 org 60,000.00 90,000.00 Pekerja Terampil 0.2000 org 70,000.00 14,000.00 Mandor 0.0200 org 100,000.00 2,000.00 Jumlah 319,210.00 Keuntungan Max. 10 % 31,921.00 Jumlah 351,131.00 Dibulatkan 351,130.00

A052 Rob 1 M2 PASANGAN LEMPENGAN RUMPUT SAMPAI TUMBUH Lempengan Rumput Gajah 1.2000 m² 4,200.00 5,040.00 Pekerja Setengah Terampil 0.0400 org 95,000.00 3,800.00 Mandor 0.0100 org 65,000.00 650.00 Jumlah 9,490.00 Keuntungan Max. 10 % 949.00 Jumlah 10,439.00 Dibulatkan 10,430.00

Page 110: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 110+29

A053 1 M3 PASANGAN BATU BELAH 1 : 6Batu Belah 1.2000 m³ 154,500.00 185,400.00 P C (50 kg) 2.3400 zak 90,900.00 212,706.00 Pasir Pasang 0.5610 m³ 118,200.00 66,310.20 Pekerja 1.2500 org 60,000.00 75,000.00 Tk.batu setengah terampil 0.5000 org 75,000.00 37,500.00 Kep.tukang batu 0.1125 org 95,000.00 10,687.50 Mandor 0.0169 org 100,000.00 1,690.00 Jumlah 589,293.70 Keuntungan Max. 10 % 58,929.37 Jumlah 648,223.07 Dibulatkan 648,220.00

A054 1 M3 PASANGAN BATU BELAH 1 : 5Batu Belah 1.2000 m³ 154,500.00 185,400.00 P C (50 kg) 2.7200 zak 90,900.00 247,248.00 Pasir Pasang 0.5440 m³ 118,200.00 64,300.80 Pekerja 1.2500 org 60,000.00 75,000.00 Tk.batu setengah terampil 0.5000 org 75,000.00 37,500.00 Kep.tukang batu 0.1125 org 95,000.00 10,687.50 Mandor 0.0169 org 100,000.00 1,690.00 Jumlah 621,826.30 Keuntungan Max. 10 % 62,182.63 Jumlah 684,008.93 Dibulatkan 684,000.00

A055 1 M3 PASANGAN BATU BELAH 1 : 4Batu Belah 1.2000 m³ 154,500.00 185,400.00 P C (50 kg) 3.2600 zak 90,900.00 296,334.00 Pasir Pasang 0.5200 m³ 118,200.00 61,464.00 Pekerja 1.2500 org 60,000.00 75,000.00 Tk.batu setengah terampil 0.5000 org 75,000.00 37,500.00 Kep.tukang batu 0.1125 org 95,000.00 10,687.50 Mandor 0.0169 org 100,000.00 1,690.00 Jumlah 668,075.50 Keuntungan Max. 10 % 66,807.55 Jumlah 734,883.05 Dibulatkan 734,880.00

A056 1 M3 PASANGAN BATU BELAH 1 : 3Batu Belah 1.2000 m³ 154,500.00 185,400.00 P C (50 kg) 4.0400 zak 90,900.00 367,236.00 Pasir Pasang 0.4850 m³ 118,200.00 57,327.00 Pekerja 1.2500 org 60,000.00 75,000.00 Tk.batu setengah terampil 0.5000 org 75,000.00 37,500.00 Kep.tukang batu 0.1125 org 95,000.00 10,687.50 Mandor 0.1690 org 100,000.00 16,900.00 Jumlah 750,050.50 Keuntungan Max. 10 % 75,005.05 Jumlah 825,055.55 Dibulatkan 825,050.00

A057 1 M3 PASANGAN BATU BELAH 1 : 2,5 Batu Belah 1.2000 m³ 154,500.00 185,400.00 P C (50 kg) 1.5900 zak 90,900.00 144,531.00 Pasir Pasang 0.3800 m³ 118,200.00 44,916.00 Pekerja 1.2500 org 60,000.00 75,000.00 Tk.batu setengah terampil 0.5000 org 75,000.00 37,500.00 Kep.tukang batu 0.1125 org 95,000.00 10,687.50 Mandor 0.0169 org 100,000.00 1,690.00 Jumlah 499,724.50 Keuntungan Max. 10 % 49,972.45 Jumlah 549,696.95 Dibulatkan 549,690.00

A058 1 M3 PASANGAN BATU BELAH 1 : 2Batu Belah 1.2000 m³ 154,500.00 185,400.00 P C (50 kg) 5.3400 zak 90,900.00 485,406.00 Pasir Pasang 0.4270 m³ 118,200.00 50,471.40 Pekerja 1.2500 org 60,000.00 75,000.00 Tk.batu setengah terampil 0.5000 org 60,000.00 30,000.00 Kep.tukang batu 0.1125 org 95,000.00 10,687.50 Mandor 0.0169 org 100,000.00 1,690.00 Jumlah 838,654.90 Keuntungan Max. 10 % 83,865.49 Jumlah 922,520.39 Dibulatkan 922,520.00

Page 111: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 111+29

A059 1 M3 PASANGAN BATU BELAH 1 : 1Batu Belah 1.2000 m³ 154,500.00 185,400.00 P C (50 kg) 7.8400 zak 90,900.00 712,656.00 Pasir Pasang 0.3140 m³ 118,200.00 37,114.80 Pekerja 1.2500 org 60,000.00 75,000.00 Tk.batu setengah terampil 0.5000 org 75,000.00 37,500.00 Kep.tukang batu 0.1125 org 95,000.00 10,687.50 Mandor 0.0169 org 100,000.00 1,690.00 Jumlah 1,060,048.30 Keuntungan Max. 10 % 106,004.83 Jumlah 1,166,053.13 Dibulatkan 1,166,050.00

A060 1 M3 PAS. BATU BELAH 1 : 4 PAKAI MUKA BATU SEGI ENAM + SIARANBatu Belah 1.5000 m³ 154,500.00 231,750.00 P C (50 kg) 1.2500 zak 90,900.00 113,625.00 Pasir Pasang 0.3480 m³ 118,200.00 41,133.60 Pekerja Terampil 1.2500 org 70,000.00 87,500.00 Tk.batu terampil 1.1250 org 90,000.00 101,250.00 Kep.tukang batu 0.1125 org 95,000.00 10,687.50 Mandor 0.0169 org 100,000.00 1,690.00 Jumlah 587,636.10 Keuntungan Max. 10 % 58,763.61 Jumlah 646,399.71 Dibulatkan 646,390.00

A061 1 M2 PAS. BATU TEMPEL + SIARANBatu Tempel 1.1000 m2 154,500.00 169,950.00 P C (50 kg) 0.1200 Zak 90,900.00 10,908.00 Pasir Pasang 0.0310 m³ 118,200.00 3,664.20 Pekerja Terampil 0.1875 org 70,000.00 13,125.00 Tk.batu terampil 0.2250 org 90,000.00 20,250.00 Kep.tukang batu 0.0375 org 95,000.00 3,562.50 Mandor 0.0338 org 100,000.00 3,380.00 Peralatan 0.0250 lot 224,839.70 5,620.99 Jumlah 230,460.69 Keuntungan Max. 10 % 23,046.07 Jumlah 253,506.76 Dibulatkan 253,500.00

A063 B 1 M2 PASANGAN BATU MUKABatu Muka 1.0100 m² 42,000.00 42,420.00 P.C (50 kg) 0.1600 zak 90,900.00 14,544.00 Pasir pasang 0.0300 m³ 118,200.00 3,546.00 Semen warna 0.0130 kg 9,100.00 118.30 Pekerja trampil 0.1875 org 70,000.00 13,125.00 Tk. batu trampil 0.3750 org 90,000.00 33,750.00 Kep. Tukang batu 0.0750 org 95,000.00 7,125.00 Mandor 0.0188 org 100,000.00 1,880.00 Jumlah 116,508.30 Keuntungan Max. 10 % 11,650.83 Jumlah 128,159.13 Dibulatkan 128,150.00

A071 1 M2 PASANGAN BATA MERAH 1 : 2Bata merah 70.0000 bh 400.00 28,000.00 P.C (50 kg) 0.5440 zak 90,900.00 49,449.60 Pasir pasang 0.0470 m³ 118,200.00 5,555.40 Pekerja setengah trampil 0.4290 org 65,000.00 27,885.00 Tk. batu setengah trampil 0.2140 org 75,000.00 16,050.00 Kep. Tukang batu 0.0210 org 95,000.00 1,995.00 Mandor 0.0110 org 100,000.00 1,100.00 Jumlah 130,035.00 Keuntungan Max. 10 % 13,003.50 Jumlah 143,038.50 Dibulatkan 143,030.00

A072 1 M2 PASANGAN BATA MERAH 1 : 3Bata merah 70.0000 bh 400.00 28,000.00 P.C (50 kg) 0.4200 zak 90,900.00 38,178.00 Pasir pasang 0.0540 m³ 118,200.00 6,382.80 Pekerja setengah trampil 0.4290 org 65,000.00 27,885.00 Tk. batu setengah trampil 0.2140 org 75,000.00 16,050.00 Kep. Tukang batu 0.0210 org 95,000.00 1,995.00 Mandor 0.0110 org 100,000.00 1,100.00 Jumlah 119,590.80 Keuntungan Max. 10 % 11,959.08 Jumlah 131,549.88 Dibulatkan 131,540.00

Page 112: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 112+29

A073 1 M2 PASANGAN BATA MERAH 1 : 4Bata merah 70.0000 bh 400.00 28,000.00 P.C (50 kg) 0.3354 zak 90,900.00 30,484.22 Pasir pasang 0.0580 m³ 118,200.00 6,855.60 Pekerja setengah trampil 0.3218 org 65,000.00 20,917.00 Tk. batu setengah trampil 0.1805 org 75,000.00 13,537.50 Kep. Tukang batu 0.0158 org 95,000.00 1,501.00 Mandor 0.0083 org 100,000.00 830.00 Jumlah 102,125.32 Keuntungan Max. 10 % 10,212.53 Jumlah 112,337.86 Dibulatkan 112,330.00

A074 1 M2 PASANGAN BATA MERAH 1 : 5Bata merah 70.0000 bh 400.00 28,000.00 P.C (50 kg) 0.1936 zak 90,900.00 17,598.24 Pasir pasang 0.0450 m³ 118,200.00 5,319.00 Pekerja setengah trampil 0.3200 org 65,000.00 20,800.00 Tk. batu setengah trampil 0.1000 org 75,000.00 7,500.00 Kep. Tukang batu 0.0100 org 95,000.00 950.00 Mandor 0.0150 org 100,000.00 1,500.00 Jumlah 81,667.24 Keuntungan Max. 10 % 8,166.72 Jumlah 89,833.96 Dibulatkan 89,830.00

A075 1 M2 PLESTERAN DINDING 1 : 2 + ACIANP.C (50 kg) 0.2368 zak 90,900.00 21,525.12 Pasir pasang 0.0190 m³ 118,200.00 2,245.80 Pekerja setengah trampil 0.2860 org 65,000.00 18,590.00 Tk. batu setengah trampil 0.2140 org 75,000.00 16,050.00 Kep. Tukang batu 0.0210 org 95,000.00 1,995.00 Mandor 0.0200 org 100,000.00 2,000.00 Jumlah 62,405.92 Keuntungan Max. 10 % 6,240.59 Jumlah 68,646.51 Dibulatkan 68,640.00

A076 1 M2 PLESTERAN DINDING 1 : 3 + ACIANP.C (50 kg) 0.1600 zak 90,900.00 14,544.00 Pasir pasang 0.0190 m³ 118,200.00 2,245.80 Pekerja setengah trampil 0.2860 org 65,000.00 18,590.00 Tk. batu setengah trampil 0.2140 org 75,000.00 16,050.00 Kep. Tukang batu 0.0210 org 95,000.00 1,995.00 Mandor 0.0200 org 100,000.00 2,000.00 Jumlah 55,424.80 Keuntungan Max. 10 % 5,542.48 Jumlah 60,967.28 Dibulatkan 60,960.00

A078 1 M2 PLESTERAN DINDING 1 : 4 + ACIANP.C (50 kg) 0.1404 zak 90,900.00 12,762.36 Pasir pasang 0.0190 m³ 118,200.00 2,245.80 Pekerja setengah trampil 0.2860 org 65,000.00 18,590.00 Tk. batu setengah trampil 0.2140 org 75,000.00 16,050.00 Kep. Tukang batu 0.0210 org 95,000.00 1,995.00 Mandor 0.0200 org 100,000.00 2,000.00 Jumlah 53,643.16 Keuntungan Max. 10 % 5,364.32 Jumlah 59,007.48 Dibulatkan 59,000.00

A079 1 M2 PLESTERAN DINDING 1 : 5 + ACIANP.C (50 kg) 0.0864 zak 90,900.00 7,853.76 Pasir pasang 0.0220 m³ 118,200.00 2,600.40 Pekerja setengah trampil 0.2000 org 65,000.00 13,000.00 Tk. batu setengah trampil 0.1500 org 75,000.00 11,250.00 Kep. Tukang batu 0.0150 org 95,000.00 1,425.00 Mandor 0.0100 org 100,000.00 1,000.00 Jumlah 37,129.16 Keuntungan Max. 10 % 3,712.92 Jumlah 40,842.08 Dibulatkan 40,840.00

Page 113: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 113+29

A129 1 M2 PAS. ONDERLAG BATU BELAH T = 20 CMPasir pasang 0.1500 m³ 118,200.00 17,730.00 Batu Belah 0.2500 m³ 154,500.00 38,625.00 Pekerja Trampil (Gali + Urug + Ampar) 0.1500 org 70,000.00 10,500.00 Peralatan 0.1200 lot 66,855.00 8,022.60 Jumlah 74,877.60 Keuntungan Max. 10 % 7,487.76 Jumlah 82,365.36 Dibulatkan 82,360.00

A130 1 M2 AMPARAN BATU PECAH MESIN 5/7 t=10 cmBatu Pecah Mesin 5/7 0.1200 m³ 218,200.00 26,184.00 Pekerja Trampil (Gali + Urug + Ampar) 0.1100 org 70,000.00 7,700.00 Peralatan 0.3200 lot 33,884.00 10,842.88 Jumlah 44,726.88 Keuntungan Max. 10 % 4,472.69 Jumlah 49,199.57 Dibulatkan 49,190.00

A131 1 M2 AMPARAN BATU PECAH MESIN 2/3 t=5 cmBatu Pecah Mesin 2/3 0.0600 m³ 272,700.00 16,362.00 Pekerja Trampil (Gali + Urug + Ampar) 0.0800 org 70,000.00 5,600.00 Peralatan 0.5000 lot 21,962.00 10,981.00 Jumlah 32,943.00 Keuntungan Max. 10 % 3,294.30 Jumlah 36,237.30 Dibulatkan 36,230.00

A132 1 M2 LAPISAN PENGISI /PENUTUPBatu pecah mesin 1/2 0.0120 m³ 290,900.00 3,490.80 Pasir Beton 0.0100 m³ 136,400.00 1,364.00 Pekerja Trampil (Gali + Urug + Ampar) 0.0500 org 70,000.00 3,500.00 Peralatan 0.9500 lot 8,354.80 7,937.06 Jumlah 16,291.86 Keuntungan Max. 10 % 1,629.19 Jumlah 17,921.05 Dibulatkan 17,920.00

A133 1 M2 PENGASPALAN MANUAL Batu abu /pasir beton 0.0050 m³ 136,400.00 682.00 Aspal 4.0000 kg 5,100.00 20,400.00 Kayu Bakar 0.0300 m³ 69,200.00 2,076.00 Pekerja Trampil (Mengaspal) 0.0600 org 70,000.00 4,200.00 Peralatan 0.1800 lot 27,358.00 4,924.44 Jumlah 32,282.44 Keuntungan Max. 10 % 3,228.24 Jumlah 35,510.68 Dibulatkan 35,510.00

A133 Rob 1 M2 PENGASPALAN MANUAL Batu abu /pasir beton 0.0050 m³ 136,400.00 682.00 Aspal 1.5000 kg 5,100.00 7,650.00 Kayu Bakar 0.0300 m³ 69,200.00 2,076.00 Pekerja Trampil (Mengaspal) 0.0600 org 70,000.00 4,200.00 Peralatan 0.1800 lot 27,358.00 4,924.44 Jumlah 19,532.44 Keuntungan Max. 10 % 1,953.24 Jumlah 21,485.68 Dibulatkan 21,480.00

A134 1 M2 HOTMIX TANGAN T=3 cm (JADI) u/ HAL & JALAN KLS 6 TON KE BAWAHAbu batu 0.0360 m³ 236,400.00 8,510.40 Aspal Panas 5.0000 kg 5,100.00 25,500.00 Kayu Bakar 0.0080 m³ 69,200.00 553.60 Pekerja Setengah Trampil 0.0800 org 65,000.00 5,200.00 Pekerja Trampil 0.0300 org 70,000.00 2,100.00 Mandor 0.0100 org 100,000.00 1,000.00 Peralatan 0.0980 lot 42,864.00 4,200.67 Jumlah 47,064.67 Keuntungan Max. 10 % 4,706.47 Jumlah 51,771.14 Dibulatkan 51,770.00

A135 1 M2 HOTMIX PAKAI ALAT BESAR T=5 cm KLS JALAN 8 TON LEBIHHotmix jadi + alat besar, tenaga & bhn bakar 0.1110 ton 546,000.00 60,606.00 Pekerja Trampil 0.0300 org 70,000.00 2,100.00 Mandor 0.0150 org 100,000.00 1,500.00 Jumlah 64,206.00 Keuntungan Max. 10 % 6,420.60 Jumlah 70,626.60 Dibulatkan 70,620.00

Page 114: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 114+29

A136 1 M2 KONSTRUKSI PENETRASI LENGKAPAmparan 5/7 T = 10 cm, digilas 1.0000 m² 19,097.00 19,097.00 Amparan 2/3 T = 5 cm, digilas 1.0000 m² 10,666.65 10,666.65 Lapisan Pengisi 1.0000 m² 2,322.50 2,322.50 Lapisan Aspal 1.0000 m² 5,747.00 5,747.00 Jumlah 37,833.15 Keuntungan Max. 10 % 3,783.32 Jumlah 41,616.47 Dibulatkan 42931.18 41,610.00

900.02.1 1M' PEMASANGAN PIPA PVC MELALUI GALIAN (TIDAK TERMASUK HARGA PIPA)Urugan Pasir 0.0830 m3 130,000.00 10,790.00 Urugan Tanah Dipadatkan 0.2650 m3 57,890.00 15,340.85 Galian Tanah Biasa 0.3480 m3 33,600.00 11,692.80 Buangan Sisa Galian 0.0830 m3 9,200.00 763.60 Penyambungan Pipa 1.0000 ls 1,000.00 1,000.00 Jumlah 39,587.25 Keuntungan Max. 10 % 3,958.72 Jumlah 43,545.97 Dibulatkan 43,540.00

G.50.Crob 1 M2 SIARAN 1 PC : 2 PSR ( BID. PENGAIRAN ) PC. (50 kg ) 0.0703 zak 90,900.00 6,387.54 Pasir Pasang 0.0085 m3 118,200.00 1,004.70 Tukang Batu 0.1200 org 90,000.00 10,800.00 Kepala Tukang Batu 0.0120 org 95,000.00 1,140.00 Pekerja 0.3600 org 60,000.00 21,600.00 Mandor 0.0180 org 100,000.00 1,800.00 Jumlah 42,732.24 Keuntungan Max. 10 % 4,273.22 Jumlah 47,005.47 Dibulatkan 47,000.00

A1 1 M3 PEK. GALIAN TANAH BIASA BASAH ( BID.PENGAIRAN )Pekerja 0.7500 org 60,000.00 45,000.00 Mandor 0.0250 org 100,000.00 2,500.00 Jumlah 47,500.00 Keuntungan Max. 10 % 4,750.00 Jumlah 52,250.00 Dibulatkan 52,250.00

A3 1 M3 PEK. GALIAN TANAH YANG BANYAK TERDAPAT BATU BUNDAR ( BID. PENGAIRAN )Pekerja 1.5000 org 60,000.00 90,000.00 Mandor 0.0330 org 100,000.00 3,300.00 Jumlah 93,300.00 Keuntungan Max. 10 % 9,330.00 Jumlah 102,630.00 Dibulatkan 102,630.00

G. 43 b. BETON CYCLOOP 1 : 3 : 5 ( BID. PENGAIRAN )Batu Belah 0.7690 m3 - Kerikil Beton 0.5571 m3 - Pasir Beton 0.3343 m3 - P.C. (50 kg) 2.7855 zak - Tukang Batu Setengah Terampil 1.0000 org - Kepala Tukang Batu 0.1000 org - Pekerja 6.0000 org - Mandor 0.3000 org - Jumlah - Keuntungan Max. 10 % - Jumlah - Dibulatkan -

G. 41 1 M3 COR BETON BERTULANG 1 PC : 2 PASIR BETON : 3 KORAL BETON ( BID. PENGAIRAN )Batu Kerikil Beton 0.8200 m3 - Pasir Beton 0.5400 m3 - P.C. (50 kg) 6.8000 m3 - Tukang Batu 1.0000 zak - Kepala Tukang Batu 0.1000 org - Pekerja 6.0000 org - Mandor 0.3000 org - Jumlah - Keuntungan Max. 10 % - Jumlah - Dibulatkan -

Page 115: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 115+29

F.8' 1 M2 CETAKAN BETON (BID. PENGAIRAN ) Tukang Kayu 0.5000 org - Kepala Tukang Kayu 0.0500 org - Pekerjan 0.2000 org - Mandor 0.0100 org - Paku 0.4000 kg - Kayu Gergajian 0.0400 m3 - 1 M3 BETON MEMERLUKAN 10 M2 CETAKAN 10 x f.8 = Rp. …………………………………….. Membongkar dan menyiram beton : Pekerja 4.0000 org - Jumlah - Keuntungan Max. 10 % - Jumlah - Dibulatkan -

G. 32.K 1 M3 PASANGAN BATU PAHAT / CANDI 30 X 30 X 30 CM, 1PC : 2 PSR ( BBID. PENGAIRAN )Batu Candi/Pahat 37.0000 bh - P.C. (50 kg) 4.2320 zak - Pasir Pasang 0.4275 m3 - Tukang Batu 1.2000 org - Kepala Tukang Batu 0.1200 org - Pekerja 0.3600 org - Mandor 0.0180 org - Jumlah - Keuntungan Max. 10 % - Jumlah - Dibulatkan -

G. 32.I 1 M3 PASANGAN BATU PAHAT / CANDI 30 X 30 X 30 CM, 1PC : 3 PSR ( BID. PENGAIRAN )Batu Candi/Pahat 37.0000 bh - P.C. (50 kg) 3.2000 zak - Pasir Pasang 0.4560 m3 - Tukang Batu 1.2000 org - Kepala Tukang Batu 0.1200 org - Pekerja 0.3600 org - Mandor 0.0180 org - Jumlah - Keuntungan Max. 10 % - Jumlah - Dibulatkan -

G.5.a BRONJONG KAWAT DIGALVANO UNTUK DIISI DENGAN BATU (1 X 1 X 3 m )DIISI BATU UNTUK TIAP 3 M3 ( 2 SEKAT LUAS PERMUKAAAN BRONJONG = 16 M3 ) DIA. 3 MMBatu Kali 3.0000 m3 - Kawat Bronjong 3 mm 28.5700 kg - Pekerja Penganyam 1.6000 org - Penganyam 2.0000 org - Mandor Penganyam 0.0800 org - Pekerjan Pengisi 4.5000 org - Mandor Pengisi 0.0750 org - Jumlah - Keuntungan Max. 10 % - Jumlah - Dibulatkan -

G.5.b BRONJONG KAWAT DIGALVANO UNTUK DIISI DENGAN BATU (1 X 1 X 3 m )DIISI BATU UNTUK TIAP 3 M3 ( 2 SEKAT LUAS PERMUKAAAN BRONJONG = 16 M3 ) DIA. 4 MMBatu Kali 3.0000 m3 - Kawat Bronjong 3 mm 42.3500 kg - Pekerja Penganyam 1.8000 org - Penganyam 2.2000 org - Mandor Penganyam 0.0800 org - Pekerjan Pengisi 4.5000 org - Mandor Pengisi 0.0750 org - Jumlah - Keuntungan Max. 10 % - Jumlah - Dibulatkan -

Page 116: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 116+29

G.5.a.R. BRONJONG UKURAN (0,5 X 1 X 2 ) UNTUK DIA. 3 MM ( 7,5 M2) 1 SEKAT Batu Kali 1.0000 m3 - Kawat Bronjong 3 mm 13.3900 kg - Pekerja Penganyam 0.7500 org - Penganyam 0.9400 org - Mandor Penganyam 0.0400 org - Pekerjan Pengisi 2.1100 org - Mandor Pengisi 0.0400 org - Jumlah - Keuntungan Max. 10 % - Jumlah - Dibulatkan -

G.5.b.R. BRONJONG UKURAN (0,5 X 1 X 2 ) UNTUK DIA. 4 MM ( 7,5 M2) 1 SEKAT Batu Kali 1.0000 m3 - Kawat Bronjong 3 mm 19.8500 kg - Pekerja Penganyam 0.7900 org - Penganyam 0.9700 org - Mandor Penganyam 0.0400 org - Pekerjan Pengisi 1.9900 org - Mandor Pengisi 0.0300 org - Jumlah - Keuntungan Max. 10 % - Jumlah - Dibulatkan -

G.5.a.R. BRONJONG UKURAN (0,5 X 1 X 2 ) UNTUK DIA. 3 MM ( 11,0 M2) 1 SEKAT Batu Kali 1.5000 m3 - Kawat Bronjong 3 mm 19.6400 kg - Pekerja Penganyam 1.1000 org - Penganyam 1.3800 org - Mandor Penganyam 0.0600 org - Pekerjan Pengisi 3.0900 org - Mandor Pengisi 0.0500 org - Jumlah - Keuntungan Max. 10 % - Jumlah - Dibulatkan -

G.5.b.R. BRONJONG UKURAN (0,5 X 1 X 2 ) UNTUK DIA. 3 MM ( 11,0 M2) 1 SEKAT Batu Kali 1.5000 m3 - Kawat Bronjong 3 mm 29.1200 kg - Pekerja Penganyam 1.2400 org - Penganyam 1.5100 org - Mandor Penganyam 0.0600 org - Pekerjan Pengisi 3.0900 org - Mandor Pengisi 0.0500 org - Jumlah - Keuntungan Max. 10 % - Jumlah - Dibulatkan -

B2 ONGKOS ANGKUT 10 M2 LEMPENGEN TEMPEL ( BID. PENGAIRAN )Angkutan 10 m2 lempengan = angkutan 1 m3 galian Tidak lebih dari 30 m1 :Pekerja 0.0330 org - Mandor 0.0010 org -

Jumlah - Keuntungan Max. 10 % - Jumlah - Dibulatkan -

B5 MENANAM 1 M1 PAGAR HIDUP ( BID. PENGAIRAN )Buah Stek 10.0000 bh - Pekerja 0.1000 orgMandor 0.0050 org Jumlah - Keuntungan Max. 10 % - Jumlah - Dibulatkan -

B6 MENANAM 1 BATANG TANAMAN BERIKUT PELINDUNGNYA ( BID. PENGAIRAN ) Batang Tanaman 1.0000 bh - Bambu Tali 1.0000 bh - Pekerja 0.4000 org - Mandor 0.0050 org - Jumlah - Keuntungan Max. 10 % - Jumlah - Dibulatkan -

Lebih dari 30 m' : aLk

: Upah Pekerja Setempat ( rupiah ) : Jarak angkut dalam m1: Harga angkutan per m3 ( Termasuk harga bahan dan peralatan angkut: bambu, dll)

Page 117: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 117+29

E 13 1 M1 TIANG DIPANCANGKAN KE DALAM TANAH LUNAK ( BID. PENGAIRAN ) Tukang Kayu 0.0400 org - Kepala Tukang 0.0040 org - Pekerja 1.8000 org - Mandor 0.0430 org - Untuk tanah biasa dihitung = 1, 25 x analis E. 13 Untuk tanah biasa dihitung = 1, 50x analis E. 13 Untuk tanah biasa dihitung = 2, 00 x analis E. 13 Jumlah - Keuntungan Max. 10 % - Jumlah - Dibulatkan -

E 14 1 M1 TIANG DIPANCANGKAN KE DALAM TANAH LUNAK ( BID. PENGAIRAN ) ( Bila perancah dipancangkan diatas rakit )Tukang Kayu 0.0600 org - Kepala Tukang 0.0060 org - Pekerja 3.0000 org - Mandor 0.0750 org - Jumlah - Keuntungan Max. 10 % - Jumlah - Dibulatkan -

E 17' 1 M1 PAPAN PENAHAN DIPANCANGKAN KE DALAM TANAH LUNAK ( BID.PENGAIRAN ) Tukang Kayu 0.0800 org - Kepala Tukang 0.0080 org - Pekerja 1.0000 org - Mandor 0.0250 org - Untuk tanah biasa dihitung = 1, 25 x analis E. 13 Untuk tanah biasa dihitung = 1, 50x analis E. 13 Untuk tanah biasa dihitung = 2, 00 x analis E. 13 Jumlah - Keuntungan Max. 10 % - Jumlah - Dibulatkan -

E17 MENCABUT TIANG PEMANCANG DARI DALAM TANAH ( BID. PENGAIRAN ) Tukang Kayu 0.3500 org - Kepala Tukang 0.0350 org - Pekerja 5.0000 org - Mandor 0.2500 org - Jumlah - Keuntungan Max. 10 % - Jumlah - Dibulatkan -

F3 1 M1 MEMBUAT SENDERAN BALOK PEMIKUL & BALOK AIR ( BID. PENGAIRAN )Tukang Kayu 24.0000 org - Kepala Tukang 2.4000 org - Pekerja 8.0000 org - Mandor 0.4000 org - Jumlah - Keuntungan Max. 10 % - Jumlah - Dibulatkan -

F4 1 M1 MEMASANG BALOK PENGGANTUNG & PENARIK S.D 15 M1 ( BID. PENGAIRAN )Tukang Kayu 36.0000 org - Kepala Tukang 3.6000 org - Pekerja 1.2000 org - Mandor 0.6000 org - Jumlah - Keuntungan Max. 10 % - Jumlah - Dibulatkan -

F5 100 KG MEMASANG GELAGAR BESI ( BID. PENGAIRAN )Tukang Kayu 0.1000 org - Kepala Tukang 0.0100 org - Pekerja 0.5000 org - Mandor 0.0250 org - Jumlah - Keuntungan Max. 10 % - Jumlah - Dibulatkan -

Page 118: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 118+29

F7 100 KG MENURUNKAN GELAGAR BESI ( BID. PENGAIRAN )Pekerja 0.5000 org - Mandor 0.0250 org - Jumlah - Keuntungan Max. 10 % - Jumlah - Dibulatkan -

F18 1 M2 MENGERJAKAN LANTAI JEMBATAN ( BID. PENGAIRAN )Tukang Kayu 0.5000 org - Kepala Tukang 0.0500 org - Pekerja 0.2000 org - Mandor 0.0100 org - Upah menggergaji 1.2000 m2 - Paku (Lantai Bawah ) atau 0.7500 kg - Paku 0.4000 kg - Jumlah - Keuntungan Max. 10 % - Jumlah - Dibulatkan -

G3 1 M2 PASANGAN BATU KOSONG TEBAL = 0,25 M SEBELAH LUAR DISIAR DENGAN PEREKAT Batu Kecil 0.2750 m3 - PC. (50 kg ) 0.0760 zak - Pasir 0.0080 m3 - Tukang Batu 0.0800 org - Kepala Tukang 0.0080 org - Pekerja 0.6150 org - Mandor 0.0310 org - Jumlah - Keuntungan Max. 10 % - Jumlah - Dibulatkan -

G4 1 M2 MEMASANG BATU PADA BENDUNG CURAHAN SALURAN MIRING DST. SETEBAL 0,23 M1Batu Kali 0.2500 m3 - Kerikil 0.0200 m3 - Pekerja 0.8000 org - Mandor 0.0400 org - Jumlah - Keuntungan Max. 10 % - Jumlah - Dibulatkan -

G.50.I 1 M2 PLESTERAN 1 PC : 3 PSR ( TEBAL 15 MM ) PC. (50 kg ) 0.1304 zak - Pasir Pasang 0.0194 m3 - Tukang Batu 0.2000 org - Kepala Tukang Batu 0.0200 org - Pekerja 0.4000 org - Mandor 0.0200 org - Jumlah - Keuntungan Max. 10 % - Jumlah - Dibulatkan -

G.50.J 1 M2 PLESTERAN 1 PC : 3 PSR ( TEBAL 10 MM ) PC. (50 kg ) 0.0864 zak - Pasir Pasang 0.0130 m3 - Tukang Batu 0.1500 org - Kepala Tukang Batu 0.0150 org - Pekerja 0.4000 org - Mandor 0.0200 org - Jumlah - Keuntungan Max. 10 % - Jumlah - Dibulatkan -

G.50.C 1 M2 SIARAN 1 PC : 2 PSR ( BID. PENGAIRAN ) PC. (50 kg ) 0.1054 zak 90,900.00 9,580.86 Pasir Pasang 0.0085 m3 118,200.00 1,004.70 Tukang Batu 0.1200 org 90,000.00 10,800.00 Kepala Tukang Batu 0.0120 org 95,000.00 1,140.00 Pekerja 0.3600 org 60,000.00 21,600.00 Mandor 0.0180 org 100,000.00 1,800.00 Jumlah 45,925.56 Keuntungan Max. 10 % 4,592.56 Jumlah 50,518.12 Dibulatkan 50,510.00

Page 119: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 119+29

L.3 1 M2 BONGKARAN PASANGAN ( BID. PENGAIRAN ) Pekerja 4.0000 org - Mandor 0.4000 org - Jumlah - Keuntungan Max. 10 % - Jumlah - Dibulatkan -

L.4 1 M2 BONGKARAN PASANGAN (TEBAL 30 MM ) ( BID. PENGAIRAN ) Pekerja 2.0000 org - Mandor 0.1000 org - Jumlah - Keuntungan Max. 10 % - Jumlah - Dibulatkan -

L.2 PEMBESIAN UNTUK SETIAP 100 KGBesi Beton 110.0000 kg - Kawat beton 2.0000 kg -

Jumlah - Keuntungan Max. 10 % - Jumlah - Dibulatkan -

M.01 7.5000 btg -

Paku 12 cm 0.5600 kg - 2.8000 kg -

Tukang Kayu 1.2000 org - Kepala Tukang Kayu 0.1200 org - Pekerja 4.8000 org - Mandor 0.0120 org - Alat Bantu 0.0100 ls - - Jumlah - Keuntungan Max. 10 % - Jumlah - Dibulatkan -

M.02 18.0000 btg -

Paku 12 cm 1.1200 kg - 5.6000 kg -

Tukang Kayu 1.4000 org - Kepala Tukang Kayu 0.1400 org - Pekerja 5.3000 org - Mandor 0.0140 org - Alat Bantu 0.0100 ls - - Jumlah - Keuntungan Max. 10 % - Jumlah - Dibulatkan -

M.03 28.5000 btg -

Paku 12 cm 1.6800 kg - 8.4000 kg -

Tukang Kayu 1.7000 org - Kepala Tukang Kayu 7.0000 org - Pekerja 5.9000 org - Mandor 0.0170 org - Alat Bantu 0.0100 ls - - Jumlah - Keuntungan Max. 10 % - Jumlah - Dibulatkan -

M.04 39.0000 btg -

Paku 12 cm 1.6800 kg - 11.2000 kg -

Tukang Kayu 2.1000 org - Kepala Tukang Kayu 0.2100 org - Pekerja 6.3000 org - Mandor 0.0210 org - Alat Bantu 0.0100 ls - - Jumlah - Keuntungan Max. 10 % - Jumlah - Dibulatkan -

1 M' JEMBATAN SEMENTARA KAYU BULAT f 30 CM PANJANG 3M' ( ASUMSI LEBAR JEMBATAN 3M' & TANPA TIANG) Kayu Bulat f 30 cm

Pasak Besi f 12 mm

1 M' JEMBATAN SEMENTARA KAYU BULAT f 30 CM PANJANG 6M' ( ASUMSI LEBAR JEMBATAN 3M' & DENGAN TIANG) Kayu Bulat f 30 cm

Pasak Besi f 12 mm

1 M' JEMBATAN SEMENTARA KAYU BULAT f 30 CM PANJANG 9M' ( ASUMSI LEBAR JEMBATAN 3M' & DENGAN TIANG) Kayu Bulat f 30 cm

Pasak Besi f 12 mm

1 M' JEMBATAN SEMENTARA KAYU BULAT f 30 CM PANJANG 12M' ( ASUMSI LEBAR JEMBATAN 3M' & DENGAN TIANG) Kayu Bulat f 30 cm

Pasak Besi f 12 mm

1 m3 Beton memerlukan = …………. (bb) ……………..kg (Hasil Perhitungan )

(bb) kg besi beton Rp. ……………………………………………..

Page 120: MUH MARIFAT 60100114037

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 120+29

A7.R. UPAH ANGKUTAN 1 ZAK SEMEN PC ( BID. PENGAIRAN )

Jumlah - Keuntungan Max. 10 % - Jumlah - Dibulatkan -

A6 ONGKOS ANGKUT 1 M3 TANAH ( BID. PENGAIRAN )Sejauh 30 meter Pekerja 0.3300 orgMandor 0.0100 orgLebih dari 30 meter

Jumlah - Keuntungan Max. 10 % - Jumlah - Dibulatkan -

1 zak PC = 50 kg = 40 liter = 0.04 m3 = 1/25 m3maka setiap jarak : (1 / (275 / ( L + 75 ))) /25 x a

L = 10 m1 = 0,01236 x aL = 50 m1 = 0,01818 x aL = 100 m1 = 0,02545 x aL = 200 m1 = 0,04000 x aL = 300 m1 = 0,05454 x a

Ket. : L = Jarak angkut dalam m1 a = Upah pekerja setempat ( Rupiah )

1 zak PC = 50 kg = 40 liter = 0.04 m3 = 1/25 m3maka setiap jarak : (1 / (275 / ( L + 75 ))) /25 x a

L = 10 m1 = 0,01236 x aL = 50 m1 = 0,01818 x aL = 100 m1 = 0,02545 x aL = 200 m1 = 0,04000 x aL = 300 m1 = 0,05454 x a

Ket. : L = Jarak angkut dalam m1 a = Upah pekerja setempat ( Rupiah ) k = a /275 ( L + 75 )

a = Upah Pekerja Setempat (rupiah )L = Jarak angkut dalam m1k = Harga angkutan per m3 (termasuk harga bahan dan peralatan angkut, bambu, dll)