QS & Tugas-tugas Di dalam Pelaksanaan
Proyek
BQ?
PLANNING?
POST CONTRACT?
CONTRACT? COMPLETION?
INCEPTION
STAGE? DESIGN?
ROLE OF a QS
PRE CONTRACT?
CONTRACT &
LAW
PLANNING &
MANAGEMENT
ECONOMICS
ENGINEERING MEASUREMENT &
ESTIMATION
COST CONTROL BUILDING
SERVICES
QS’s
Weapon
CONSTRUCTION
TECHNOLOGY
All that is required to perform his duties adequately…..
APPOINTMENT OF THE QS
BAGAIMANA QS
TERLIBAT?
Quantity
Surveyor Reg. QS
Building
Economist
Cost
Consultant
Cost
Engineer
& many
more..
Pendaftaran Sebagai QS
Mesti memperoleh kelulusan dan izin untuk praktis dari Asosiasi.
Contoh: Art. 10 (1) & (2), Registration of Quantity Surveyor Act 1967;
Mempunyai kelulusan yang di akui oleh Pemerintah
Kelulusan formil pendidikan QS
Pengalaman praktek sebagai QS (2 tahun) dibawah supervisi QS bersertifikasi “Ahli”
Lulus ujian kompetensi
Kondisi Pelantikan Konsultan QS D
EF
INA
SI
MEMORANDUM PERJANJIAN
Antara Employer/Klien dan Konsultan QS P
ER
KH
IDM
ATA
N T
AM
BA
HA
N
AB
ITR
AS
I
NO
TIS
INT
ER
PR
ETA
TIO
N
LA
IN-L
AIN
PE
NG
HA
NTA
RA
N D
OK
UM
EN
TE
MP
UH
MA
SA
PE
RLA
NT
IKA
N
OB
LIG
AS
I
HA
KC
IPTA
DO
KU
ME
N &
KE
RJA
MA
KLU
MA
T &
SK
OP
PR
OY
EK
PA
RK
HID
MA
TA
N &
BA
YA
RA
N
Bagaimana Cara Pembayaran
BAGAIMANAKAH Qs dibayar oleh klien? % jumlah kerja
keseluruhan
Mengikut aktivitas kerja
Kebiasaan; Lebih kurang 50% selepas
penyediaan BQ,
Bertahap di dalam waktu proyek,
Selebihnya dalam waktu 42 hari setelah menyiapkan Final Account
Professional QS Bodies (Contoh)
Board of Quantity Surveyors Malaysia (BOQS)
Royal Institute of Surveyors Malaysia (RISM
Board of Quantity Surveyors Malaysia
Mendaftar QS… dan membatalkan pendaftaran
Mendaftar Konsultan QS dan organisasi
Menentukan „Scale of Fees‟
Mengadili “salah laku” professional QS
Lain-lain
Royal Institute of Surveyors Malaysia (RISM)
Mewakili professi QS dan professional lain
Promosi
Pemantauan
Latihan & Ujian professional
Etc.
Service of QS
Feasibility studies, preliminary estimates, cost plan, prequalification reports, bill of quantities, tender documents, tender estimates, tender report, contract documents, valuation of works, interim payment, variations, final account, project cost management, value management, risk management, facilities management, project management, construction management, claim management, dispute resolution services, cost auditing, condition survey, remeasurement, cash flow, life cycle costing, pricing bill of quantities, pricing and agreeing schedule of rates, attendance for arbitration or litigation
Feasibility Studies
(studies and life
cycle costing)
Bill of Quantities
&Tender
Tender Reports
Final Account
Preliminary
Estimates & Cost
Plan
Contractual
Arrangement Valuation of Work
Progress & Payment
Variations &
Contractual Claims
Litigation or
Arbitration or ADR
Liabiliti QS
Penyediaan BQ, Pengukuran (Measurement) and Anggaran (Pricing)
Kelalaian/kesalahan
Dokumen Tender & penilaian Tender
Evaluasi pembayaran kemajuan
BREACH
express contractual duties, implied contractual duties, duty owed to the
client, duty owed to third parties
Bolam v Friern Hospital Management Committee (1957)
Hedley Byrne v Heller (1964)
List of Liability
Kelalaian di dalam …
Penyediaan Bill of Quantities (BQ)
Maklumat tentang membuat perkiraan (Forecast Information)
Penyediaan Dokumen Tender & Penilaian Tender
Penilaian untuk pembayaran
Waghorn v Wimbledon Local Board (1877)
London School Board v Northcroft (1889)
Tyrer v District Auditor for Monmouthshire (1973)
Penyediaan Bills of Quantities (BQ), Pengukuran (Measurement) & Anggaran (Pricing)
Liabiliti di dalam menghitung kuantiti atau menentukan hargaa yang perlu dibayar oleh klien kepada kontraktor
Eckersley v Binnie (1998)
Nye Saunders and Partners v Bristow (1987)
Copthrone Hotel v Arup Associates (1996)
Akibat ‘Kesalahan dalam membuat Perkiraan (Negligence Forecast)’
Mengumpulkan data yang salah
Kegagalan membuat analisa yang betul
Membuat perkiraan yang salah
Blackpool & Flyde Aero Club v Blackpool BC (1990)
Plymouth & South West Cooperative Society Ltd v
Architecture, Structure & Management Ltd (2006)
Pratt v George J Hill Associates (1987)
Dokumentasi Tender & Penilaian Tender
Tidak menerima kesemua dokumen tender
Tidak mengevaluasi konsistensi setiap dokumen tender sewaktu membuat evaluasi
Sutcliffe v Thackarah (1974)
RB Burden Ltd v Swansea Corporation (1957)
John Laing Construction Ltd v County District Properties Ltd
(1982)
Evaluasi Klaim & Pembayaran
Tidak menjalankan evaluasi kerja dengan keahlian yang benar
Tidak berhati-hati dan cermat
Permintaan QS
Permintaan – dari negara-negara maju kepada negara-negara sedang membangun
Perjanjian (treaty), pembicaraan dan protocol untuk membolehkan transaksi
Globalisasi