Modul 2 - Mengenal Elemen-Elemen Kompetensi QS Di Dalam Periode Proyek
-
Upload
tessaldi-ilmi -
Category
Documents
-
view
216 -
download
1
description
Transcript of Modul 2 - Mengenal Elemen-Elemen Kompetensi QS Di Dalam Periode Proyek
Modul 2: Mengenalpasti Elemen-
Elemen Kompetensi QS Di Dalam Lifecycle Proyek
Feasibility study Tender Award
Facilities Management / Maintenance Management/Operations Management
Construction Project Contract Management (Contractor)
Project Management
Project Manager
Construction Management (Construction Manager)
Handover Decommissioning
Facilities/Maintenance/Operations Manager
Construction
(Life Cycle Costing)
(Project Costing)
(Construction Costing)
Design Development
Documentation & Tendering
Design Process Management
(Consultants/s.o)
Pengurusan Proyek ‘Project Life Cycle’
Defects Liability period
Kejayaan/Kegagalan Proyek
TIME
QUALITY COST
Menjaga Alam
Sekitar
Keselamatan & Kesehatan
Terlaksana Semua Perjanjian
& Hutang Client &
Customer Satisfaction
Feasibility
Study
Appoint Consultant
Site Investigation
Budget Allocation
Client’s Brief
Preliminary
Estimate
Cost
Planning
Conceptual
Design
Schematic
Design
Detail Design
Detail Cost
Estimate
Elemental
Cost Analysis
Authorities
Approval
Specifications
Tender
Documentation
Tendering
Tender
Evaluation
Tender Award
Construction
Site Management
Time
Cost
Quality
Health & Safety
Environment
Contract
Administration
Project
Monitoring
Testing &
Commissioning
Project
Handover
Defects Liability
Period (DLP) Management
Close-Out
CONCEPTUAL DESIGN DEVELOPMENT
TENDERING CONSTRUCTION PROJECT
HAND OVER
Aktivitas-aktivitas Pengurusan Proyek Di Dalam Jangkahayat Proyek
Project
Planning (Project
Objectives)
KEBERHASILAN/ KEGAGALAN SEBUAH PROYEK
Inception
Construction Design
Tendering Close Out
DLP
Management Hand Over
Testing &
Commissionin
g
Project Monitoring
Contract Administration
(2)
Elemental Cost analysis
Site
Investigation
Clients’ Brief Consultant
Appointment
Cost Planning
Conceptual
Design
Feasibility Study
Preliminary
Estimate Tender Award
Tender
Evaluation Tender Exercise Tender
Documentation
Project Success or
Failure
Final Account
Schematic
Design
Detail
Design &
Specifications
Detail Cost Estimate/Pre-tender Estimate
Authorities Approval
Construction
Management (1)
Start
Planning
Budget
Allocation
(1)*
• Time
• Cost
• Quality
• Health & Safety
• Environment
(2)*
• Contract Sum
• Claims & Payments
• Variations
• Extension of Time
• Determination
• Completion
• Etc.
Simulasi 1:
Simulasi 1:
1. Buat list permasalahan utama yang timbul
dalam pengurusan proyek anda
2. Menggunakan kerangka aktivitas
pelaksanaan proyek (harap merujuk
bahan rujukan simulasi), tandakan
aktivitas-aktivitas proyek yang tidak
/kurang dijalankan dalam pelaksanaan
proyek anda yang menjadi penyebab timbulnya masaalah-masalah ini.
Bahan Rujukan Simulasi (1)
Inception
Construction Design
Tendering Close Out
DLP
Management Hand Over
Testing &
Commissionin
g
Project Monitoring
Contract Administration
(2)
Elemental Cost analysis
Site
Investigation
Clients’ Brief Consultant
Appointment
Cost Planning
Conceptual
Design
Feasibility Study
Preliminary
Estimate Tender Award
Tender
Evaluation Tender Exercise Tender
Documentation
Project Success or
Failure
Final Account
Schematic
Design
Detail
Design &
Specifications
Detail Cost Estimate/Pre-tender Estimate
Authorities Approval
Construction
Management (1)
Start
Planning
Budget
Allocation
(1)*
• Time
• Cost
• Quality
• Health & Safety
• Environment
(2)*
• Contract Sum
• Claims & Payments
• Variations
• Extension of Time
• Determination
• Completion
• Etc.
Feasibility
Study
Appoint Consultant
Site Investigation
Budget Allocation
Client’s Brief
Preliminary
Estimate
Cost
Planning
Conceptual
Design
Schematic
Design
Detail Design
Detail Cost
Estimate
Elemental
Cost Analysis
Authorities
Approval
Specifications
Tender
Documentation
Tendering
Tender
Evaluation
Tender Award
Construction
Site Management
Time
Cost
Quality
Health & Safety
Environment
Contract
Administration
Project
Monitoring
Testing &
Commissioning
Project
Handover
Defects Liability
Period (DLP) Management
Close-Out
CONCEPTUAL DESIGN DEVELOPMENT
TENDERING CONSTRUCTION PROJECT
HAND OVER
Bahan Runjukan Simulasi (2)
Project
Planning (Project
Objectives)
Feasibility
Study
Appoint Consultant
Site Investigation
Budget Allocation
Client’s Brief
Preliminary
Estimate
Cost
Planning & Life Cycle
Costing
Conceptual
Design
Schematic
Design
Measuring
Detail Design
Detail Cost
Estimate
Elemental
Cost Analysis
Authorities
Approval
Specifications
Tender
Documentation
Tendering
Tender
Evaluation
Tender Award
Construction
Site Management
Time
Cost
Quality
Health & Safety
Environment
Contract
Administration*
Project
Auditing
Testing &
Commissioning
Project
Handover
Defects Liability
Period (DLP) Management
Final Account
CONCEPTUAL DESIGN DEVELOPMENT
TENDERING CONSTRUCTION PROJECT
HAND OVER
Bahan Runjukan Simulasi (2)
Project
Planning (Project
Objectives)
• Contract Sum • Claims & Payments • Variations
• Extension of Time • Determination • Completion • Etc.
Terima Kasih