Master Rab Rumah Kecil

51
PERBANDINGAN CAMPURAN BETON Beton campuran 1 : 3 : 5 1 m³ Pc = 1 x 0.760 = 0.760 m³ spesi basah 3 m³ Ps = 3 x 0.675 = 2.025 m³ spesi basah 5 m³ Kr = 5 x 0.520 = 2.600 m³ spesi basah 5.385 m³ spesi basah 1 m³ Beton membutuhkan : Pc = 1/5.385 x 0.76 = 0.141 = 176.415970287837 Kg = 4.410399 sak ~ 5 sak Ps = 0.376 Kr = 0.483 Beton campuran 1 : 2 : 3 1 m³ Pc = 1 x 0.760 = 0.760 m³ spesi basah 2 m³ Ps = 2 x 0.675 = 1.350 m³ spesi basah 3 m³ Kr = 3 x 0.520 = 1.560 m³ spesi basah 3.670 m³ spesi basah 1 m³ Beton membutuhkan : Pc = 1/3.67 x 0.76 = 0.207 = 258.855585831063 Kg = 6.47139 sak ~ 7 sak Ps = 0.368 Kr = 0.425

Transcript of Master Rab Rumah Kecil

Page 1: Master Rab Rumah Kecil

PERBANDINGAN CAMPURAN BETON

Beton campuran 1 : 3 : 51 m³ Pc = 1 x 0.760 = 0.760 m³ spesi basah3 m³ Ps = 3 x 0.675 = 2.025 m³ spesi basah5 m³ Kr = 5 x 0.520 = 2.600 m³ spesi basah

5.385 m³ spesi basah1 m³ Beton membutuhkan :

Pc = 1/5.385 x 0.76 = 0.141 m³= 176.415970287837 Kg = 4.4103993 sak ~ 5 sak

Ps = 0.376 m³Kr = 0.483 m³

Beton campuran 1 : 2 : 31 m³ Pc = 1 x 0.760 = 0.760 m³ spesi basah2 m³ Ps = 2 x 0.675 = 1.350 m³ spesi basah3 m³ Kr = 3 x 0.520 = 1.560 m³ spesi basah

3.670 m³ spesi basah1 m³ Beton membutuhkan :

Pc = 1/3.67 x 0.76 = 0.207 m³= 258.855585831063 Kg = 6.4713896 sak ~ 7 sak

Ps = 0.368 m³Kr = 0.425 m³

Page 2: Master Rab Rumah Kecil

Hal 2/46

ANALISA BETON BERTULANG

Tabel Berat Besi

mm kg/m

Ø 5 0.15 8000 14400 4.9

Ø 6 0.22 8000 21120

Ø 8 0.39 8000 37440 8.3

Ø 10 0.62 8000 59520 9.5

Ø 12 0.89 8000 85440

Ø 14 1.21 8000 116160

Ø 16 1.58 8000 151680

Sloof 15/20 Begel 10/15 jarak 20cm

per m1 sat per m3 sat jmlh batang / m3

Volume 0.03 m3

Bekisting 0.4 m2 13.3333 m2

Perancah m2 0.0000 m2

d (mm) p (m)

Besi Ø 10 1 4 4 2.48 11.1111111111111

Ø 5 0.54 5 2.7 0.405 2.885 kg 96.1667 kg 7.5 166.666667

Sloof 15/25 Begel 10/20 jarak 20cm

per m1 sat per m3 sat jmlh batang / m3

Volume 0.0375 m3

Bekisting 0.5 m2 13.3333 m2

Perancah m2 0.0000 m2

d (mm) p (m)

Besi Ø 12 1 5 5 4.45 11.1111111111111

Ø 6 0.64 5 3.2 0.704 5.154 kg 137.4400 kg 7.11111111111111

Ringbalk 15/20 Begel 10/15 jarak 20cm

per m1 sat per m3 sat jmlh batang / m3

Volume 0.03 m3

Bekisting 0.6 m2 20.0000 m2

Perancah 3 m2 100.0000 m2

d (mm) p (m)

Besi Ø 10 1 4 4 2.48 11.1111111111111

Ø 5 0.54 5 2.7 0.405 2.885 kg 96.1667 kg 7.5

Ringbalk, Latey 15/15 Begel 10/10 jarak 20cm

per m1 sat per m3 sat jmlh batang / m3

Volume 0.0225 m3

Bekisting 0.4 m2 17.7778 m2

Perancah 2 btg 88.8889 btg

d (mm) p (m)

Besi Ø 8 1 4 4 1.56 14.8148148148148

Ø 5 0.44 5 2.2 0.33 1.89 kg 84.0000 kg 8.14814814814815

Kolom Praktis 15/15 Begel 10/10 jarak 20cm

per m1 sat per m3 sat jmlh batang / m3

Volume 0.0225 m3

Bekisting 0.4 m2 17.7778 m2

Perancah btg btg

d (mm) p (m)

Besi Ø 8 1 4 4 1.56 14.8148148148148

Ø 5 0.44 5 2.2 0.33 1.89 kg 84.0000 kg 8.14814814814815 222.222222

Balok 15/25 Begel 10/20 jarak 20cm

per m1 sat per m3 sat jmlh batang / m3

Volume 0.0375 m3

Bekisting 0.41 m2 10.9333 m2

Perancah 3 btg 80.0000 btg

d (mm) p (m)

Besi Ø 12 1 5 5 4.45 11.1111111111111

Ø 6 0.64 5 3.2 0.704 5.154 kg 137.4400 kg 7.11111111111111

Page 3: Master Rab Rumah Kecil

Hal 3/46

Balok 15/30 Begel 10/25 jarak 15 - 20cm (17,5cm)

per m1 sat per m3 sat jmlh batang / m3

Volume 0.045 m3

Bekisting 0.51 m2 11.3333 m2

Perancah 3 btg 66.6667 btg

d (mm) p (m)

Besi Ø 12 1 7 7 6.23 12.962962962963

Ø 6 0.74 5.714 4.2284 0.9302 7.1602392 kg 159.1164 kg 7.8302962962963

Balok 20/60 Begel 10/25 jarak 10 - 20cm (15cm)

per m1 sat per m3 sat jmlh batang / m3

Volume 0.12 m3

Bekisting 0.51 m2 11.3333 m2

Perancah 3 btg 66.6667 btg

d (mm) p (m)

Besi Ø 12 1 7 7 6.23 12.962962962963

Ø 6 0.74 5.714 4.2284 0.9302 7.1602392 kg 159.1164 kg 7.8302962962963

Kolom 15/20 Begel 10/15 jarak 20cm

per m1 sat per m3 sat jmlh batang / m3

Volume 0.03 m3

Bekisting 0.4 m2 13.3333 m2

Perancah 0.67 btg 22.3333 btg

d (mm) p (m)

Besi Ø 10 1 4 4 2.48 11.1111111111111

Ø 5 0.54 5 2.7 0.405 2.885 kg 96.1667 kg 7.5

Kolom 15/30 Begel 10/25 jarak 15 - 20cm (17,5cm)

per m1 sat per m3 sat jmlh batang / m3

Volume 0.045 m3

Bekisting 0.51 m2 11.3333 m2

Perancah 1 btg 22.2222 btg

d (mm) p (m)

Besi Ø 12 1 8 8 7.12 14.8148148148148

Ø 6 0.74 5.714 4.2284 0.9302 8.0502392 kg 178.8942 kg 7.8302962962963

Kolom 30/30 Begel 10/25 jarak 15 - 20cm (17,5cm)

per m1 sat per m3 sat jmlh batang / m3

Volume 0.09 m3

Bekisting 0.7 m2 7.7778 m2

Perancah 1 btg 11.1111 btg

d (mm) p (m)

Besi Ø 16 1 4 4 6.32 3.7037037037037

Ø 12 1 4 4 3.56 3.7037037037037

Ø 10 1.09 5.714 6.2283 3.8615 13.7415212 kg 152.6836 kg 5.76690740740741

Kolom 25/25 Begel 10/25 jarak 15 - 20cm (17,5cm)

per m1 sat per m3 sat jmlh batang / m3

Volume 0.0625 m3

Bekisting 0.6 m2 9.6000 m2

Perancah 1 btg 16.0000 btg

d (mm) p (m)

Besi Ø 16 4 0 0 0

Ø 12 1 8 8 7.12 10.6666666666667

Ø 8 0.9 5.714 5.1426 3.1884 10.308412 kg 164.9346 kg 6.8568

Plat lantai t = 12cm Jarak 25 x 25 cm (2 lapis)

per m2 sat per m3 sat jmlh batang / m3

Volume 0.12 m3

Bekisting 1 m2 8.3333 m2

Perancah 1 m2 8.3333 m2

d (mm) p (m)

Besi 0

Page 4: Master Rab Rumah Kecil

Hal 4/46

Ø 10 1 16 16 9.92 9.92 kg 82.6667 kg 11.1111111111111

Atap t = 8cm Jarak 20 x 20 cm (1 lapis)

per m2 sat per m3 sat

Volume 0.08 m3

Bekisting 1 m2 12.5000 m2

Perancah 1 m2 12.5000 m2

d (mm) p (m)

Besi

Ø 8 1 10 10 3.9 3.9 kg 48.7500 kg

Atap t = 10cm Jarak 30 x 30 cm (2 lapis)

per m2 sat per m3 sat jmlh batang / m3

Volume 0.1 m3

Bekisting 1 m2 10.0000 m2

Perancah 1 m2 10.0000 m2

d (mm) p (m)

Besi 0

Ø 8 1 13.334 13.334 5.2003 5.20026 kg 52.0026 kg 11.1116666666667

Voet plat 80x80 Begel 10/25 jarak 15cm

per unit sat per m3 sat jmlh batang / m3

Volume 0.11675 m3

Bekisting 0.48 m2 4.1113 m2

Perancah

d (mm) p (m)

Besi Ø 12 32.4 1 32.4 28.836 23.1263383297645

Ø 6 0.74 6 4.44 0.9768 29.8128 kg 255.3559 kg 3.16916488222698

Voet plat 60x60 Begel 10/15 jarak 15cm

per unit sat per m3 sat jmlh batang / m3

Volume 0.054 m3

Bekisting 0.48 m2 4.1113 m2

Perancah

d (mm) p (m)

Besi Ø 10 8.8 1 8.8 5.456 13.5802469135802

Ø 5 0.54 5 2.7 0.405 5.861 kg 108.5370 kg 4.16666666666667 92.59259

Voet plat 100x100 Begel 30/30 jarak 15cm

per unit sat per m3 sat jmlh batang / m3

Volume 0.281 m3

Bekisting 0.48 m2 4.1113 m2

Perancah

d (mm) p (m)

Besi Ø 12 32.4 1 32.4 28.836 23.1263383297645

Ø 6 0.74 6 4.44 0.9768 29.8128 kg 255.3559 kg 3.16916488222698

balok 20/93 Begel 10/25 jarak 15 - 20cm (17,5cm)

per m1 sat per m3 sat jmlh batang / m3

Volume 0.186 m3

Bekisting 0.6 m2 3.2258 m2

Perancah 1 btg 5.3763 btg

d (mm) p (m)

Besi Ø 16 1 3 3 4.74 5.55555555555556

Ø 12 1 10 10 8.9 4.48028673835125

Ø 8 2.15 5.714 12.285 4.7912 18.431189 kg 99.0924 kg 5.5040770609319

balok 20/60 Begel 10/25 jarak 15 - 20cm (17,5cm)

per m1 sat per m3 sat jmlh batang / m3

Volume 0.12 m3

Bekisting 0.6 m2 5.0000 m2

Perancah 1 btg 8.3333 btg

d (mm) p (m)

Besi Ø 16 1 3 3 4.74 5.55555555555556

Page 5: Master Rab Rumah Kecil

Hal 5/46

Ø 12 1 6 6 5.34 4.16666666666667

Ø 8 1.5 5.714 8.571 3.3427 13.42269 kg 111.8558 kg 5.95208333333333

Kolom 25/25 Begel 10/25 jarak 15 - 20cm (17,5cm)

per m1 sat per m3 sat jmlh batang / m3

Volume 0.0625 m3

Bekisting 0.6 m2 9.6000 m2

Perancah 1 btg 16.0000 btg

d (mm) p (m)

Besi Ø 16 4 0 0 0

Ø 12 1 8 8 7.12 10.6666666666667

Ø 8 0.9 5.714 5.1426 3.1884 10.308412 kg 164.9346 kg 6.8568

Page 6: Master Rab Rumah Kecil

Hal 6/46

DAFTAR HARGA SATUAN UPAH DAN BAHANKOTA SEMARANG

Tahun 2011

SATUAN HARGA KET.

NO. U R A I A N SATUAN

(RUPIAH)

A U P A H :

1 Tukang Batu hari 43,000

2 Tukang Besi hari 43,000

3 Tukang Kayu hari 43,000

4 Kepala Tukang hari 47,000

5 Pekerja hari 33,000

6 Mandor hari 45,000

B B A H A N / M A T E R I A L :

1 Amplas Tembok lbr. 600

2 Amplas Sikkens lbr. 2,500

3 Adukan ready mix K-225 m3 560,000

4 Alat bantu selang lot 80,000

5 Batu Bata Welahan bh. 400

6 Batu Belah m3 100,000

7 Besi Beton kg. 7,500

8 Bubungan Genteng beton flat bh. 3,800

9 Cat Dasar kg. 20,000

10 Cat Kilat kg. 60,000

11 Cat Meni Nippon kg. 15,000

12 Cat Dulux Ext ltr. 70,000

13 Cat Tembok samping flinkote kg. 26,000

14 Cat Tembok exterior mowilex ltr. 55,000

15 Cat Tembok interior ex catylac kg. 18,000

16 Cat plafond maxilite kg. 8,800

17 Cat Alkali kg. 23,750

18 Folding Gate m2 285,000

19 Genteng beton flat bh. 3,500

20 Gypsum 9 mm lbr 46,000

21 Kalsiboard ex. Nusaboard 4,5 mm lbr 45,000

22 Kaca Bening 5 mm m2 60,000

23 Kaca Warna 10 mm m2 250,000

24 Kawat Pengikat kg. 14,000

25 Kayu Dolken btg 12,000

26 Kayu Bengkirai Papan m3 6,000,000

27 Kayu Bengkirai 6/12 x 4m btg 200,000

28 Besi Hollow btng 18,000

29 Kayu Usuk untuk Cor m3 2,500,000

30 Koral Beton m3 170,000

31 Lembar Seng m1 25,000

32 List Gypsum m1 12,000

33 Minyak Cat ltr. 5,500

34 Multiplex 9mm lbr 105,000

35 Paku bermacam-macam ukuran kg 15,000

36 Paku Beton bh. 500

37 Paku Biasa kg. 15,000

38 Paku Gypsum kg 30,000

39 Papan Cor lbr 7,000

40 Pasir Muntilan m3 130,000

41 Pasir Urug m3 90,000

42 Plamir Kayu kg. 11,000

Page 7: Master Rab Rumah Kecil

Hal 7/46

DAFTAR HARGA SATUAN UPAH DAN BAHANKOTA SEMARANG

Tahun 2011

SATUAN HARGA KET.

NO. U R A I A N SATUAN

(RUPIAH)

43 Plamir Tembok kg. 8,000

44 S p l i t m3 170,000

45 Semen Portland (PC) zak 42,000

46 Semen Putih zak 55,000

47 Tanah Urug m3 50,000

48 Ter / Residu ltr. 9,000

49 Thinner ltr. 6,500

50 Alat Bantu / Steiger Ls 18,000

51 Kayu Usuk 5/7 x 4m Bengkirai btg 85,000

52 Kayu Reng 2/3 4 m Bengkirai btg 13,000

53 Papan 2/30 x 4 m lbr 110,000

54 Wood plank 2/20 x 4 m ex. Elephant lbr 45,000

55 Keramik 40 x 40 cm ex platinum dos 50,000

56 Keramik 33 x 33 cm platinum dos 45,000

57 Keramik 30 x 30 cm ex asia tile dos 35,000

58 Keramik 30 x 30 cm ex platinum dos 35,000

59 Keramik 20 x 20 cm ex asia tile dos 32,000

60 Keramik 25 x 33 cm platinum dos 41,500

61 Keramik 20 x 25 cm ex asia tile dos 35,000

62 List 25cm platinum bh. 16,000

63 List 20cm asia tile bh. 6,000

Page 8: Master Rab Rumah Kecil

Hal 8/46

DAFTAR ANALISA PEKERJAAN

PEMBANGUNAN RUMAH TINGGALKOTA SEMARANG 2011

I. PEKERJAAN PERSIAPAN

0.1000 Pekerja @Rp. 33,000.00 Rp. 3,300.00 5,550.00

0.0500 Mandor @Rp. 45,000.00 Rp. 2,250.00

Rp. 5,550.00

2. Analisa 10 M' Pasangan Bouwplank0.0030 Kayu Cor @Rp. 2,500,000.00 Rp. 7,500.00

6.0000 Btg Kayu Gelam @Rp. 12,000.00 Rp. 72,000.00

0.1000 Kg Paku Biasa @Rp. 15,000.00 Rp. 1,500.00

1.0000 Tukang @Rp. 43,000.00 Rp. 43,000.00 82,950.00

0.1000 Kepala Tukang @Rp. 47,000.00 Rp. 4,700.00

1.0000 Pekerja @Rp. 33,000.00 Rp. 33,000.00

0.0500 Mandor @Rp. 45,000.00 Rp. 2,250.00

163,950.00

Untuk 1 M' = 1/10 Rp. 16,395.00

II. PEKERJAAN PONDASI.

0.7500 Pekerja @Rp. 33,000.00 Rp. 24,750.00 25,875.00

0.0250 Mandor @Rp. 45,000.00 Rp. 1,125.00

Rp. 25,875.00

0.2500 Pekerja @Rp. 33,000.00 Rp. 8,250.00 8,628.00

0.0084 Mandor @Rp. 45,000.00 Rp. 378.00

Rp. 8,628.00

1.2000 m3 Pasir Urug @Rp. 90,000.00 Rp. 108,000.00

0.3000 Pekerja @Rp. 33,000.00 Rp. 9,900.00 10,350.00

0.0100 Mandor @Rp. 45,000.00 Rp. 450.00

Rp. 118,350.00

1.1000 Batu Kali @Rp. 100,000.00 Rp. 110,000.00

0.5000 Pasir Urug @Rp. 90,000.00 Rp. 45,000.00

1.5000 Pekerja @Rp. 33,000.00 Rp. 49,500.00 52,875.00

0.0750 Mandor @Rp. 45,000.00 Rp. 3,375.00

Rp. 207,875.00

1.2000 Batu Kali @Rp. 100,000.00 Rp. 120,000.00

2.4000 Zak Semen Portland (PC) @Rp. 42,000.00 Rp. 100,800.00

0.7600 Pasir Pasang @Rp. 130,000.00 Rp. 98,800.00

0.6000 Tukang @Rp. 43,000.00 Rp. 25,800.00 81,495.00

0.0600 Kepala Tukang @Rp. 47,000.00 Rp. 2,820.00

1.5000 Pekerja @Rp. 33,000.00 Rp. 49,500.00

0.0750 Mandor @Rp. 45,000.00 Rp. 3,375.00

Rp. 401,095.00

1.2000 Tanah Urug @Rp. 50,000.00 Rp. 60,000.00

0.3000 Pekerja @Rp. 33,000.00 Rp. 9,900.00 10,350.00

0.0100 Mandor @Rp. 45,000.00 Rp. 450.00

1. Analisa 1 m2 Pembersihan Lapangan

M3

1. Analisa 1 M3 Galian Tanah Pondasi

2. Analisa 1 M3 Urugan Tanah Kembali

3. Analisa 1 M3 Urugan Pasir Bawah Pondasi

4. Analisa 1 M3 Aanstamping Batu KaliM3

M3

5. Analisa 1 M3 Pasangan Pondasi Batu Kali ad. 1 : 8M3

M3

6. Analisa 1 M3 Urugan Tanah UrugM3

Page 9: Master Rab Rumah Kecil

Hal 9/46

Rp. 70,350.00

III. PEK. BETON BERTULANG Ad. 1:2:3

7.8960 Zak Semen Portland (PC) @Rp. 42,000.00 Rp. 331,632.00

0.4900 Pasir Pasang @Rp. 130,000.00 Rp. 63,700.00

0.8200 Koral Beton @Rp. 170,000.00 Rp. 139,400.00

0.2500 Tukang @Rp. 43,000.00 Rp. 10,750.00 69,975.00

0.0250 Kepala Tukang @Rp. 47,000.00 Rp. 1,175.00

1.6500 Pekerja @Rp. 33,000.00 Rp. 54,450.00

0.0800 Mandor @Rp. 45,000.00 Rp. 3,600.00

Rp. 604,707.00

1.0000 Adukan ready mix K-225 @Rp. 560,000.00 Rp. 560,000.00

0.0450 Alat bantu selang @Rp. 80,000.00 Rp. 3,600.00

1.0000 Upah Tenaga @Rp. 34,987.50 Rp. 34,987.50

Rp. 598,587.50

5.6750 Zak Semen Portland (PC) @Rp. 42,000.00 Rp. 238,350.00

0.5400 Pasir Pasang @Rp. 130,000.00 Rp. 70,200.00

0.9100 Koral Beton @Rp. 170,000.00 Rp. 154,700.00

1.0000 Upah Tenaga @Rp. 69,975.00 Rp. 69,975.00

Rp. 533,225.00

d. Analisa Tulang Besi 1 Kg Besi Beton Terpasang

1.0500 Kg Besi Beton @Rp. 7,500.00 Rp. 7,875.00

0.0150 Kg Kawat Pengikat @Rp. 14,000.00 Rp. 210.00

0.0070 Tukang @Rp. 43,000.00 Rp. 301.00 582.90

0.0007 Kepala Tukang @Rp. 47,000.00 Rp. 32.90

0.0070 Pekerja @Rp. 33,000.00 Rp. 231.00

0.0004 Mandor @Rp. 45,000.00 Rp. 18.00

Rp. 8,667.90

e. Analisa Upah Bekisting (dengan papan cor l=20cm p=200cm) / M2 (3x pakai)

0.8333 lbr Papan cor @Rp. 7,000.00 Rp. 5,833.33

0.2000 Kg Paku Biasa @Rp. 15,000.00 Rp. 3,000.00

0.2600 Tukang @Rp. 43,000.00 Rp. 11,180.00 30,732.00

0.0260 Kepala Tukang @Rp. 47,000.00 Rp. 1,222.00

0.5200 Pekerja @Rp. 33,000.00 Rp. 17,160.00

0.0260 Mandor @Rp. 45,000.00 Rp. 1,170.00

Rp. 39,565.33

f. Analisa Pembuatan Tiang Perancah /M2 (4x pakai)

1.5625 btg Kayu Dolken @Rp. 12,000.00 Rp. 18,750.00

0.2000 Kg Paku @Rp. 15,000.00 Rp. 3,000.00

0.3300 Tukang @Rp. 43,000.00 Rp. 14,190.00 38,730.00

0.0300 Kepala Tukang @Rp. 47,000.00 Rp. 1,410.00

0.6600 Pekerja @Rp. 33,000.00 Rp. 21,780.00

0.0300 Mandor @Rp. 45,000.00 Rp. 1,350.00

Rp. 60,480.00

1. Analisa Beton Bertulang Pondasi Foot Plat ad. 1:2:3 Kecil1.0000 Beton cor ready mix K-225 @Rp. 598,587.50 Rp. 598,587.50

5.3333 M2 Bekisting @Rp. 39,565.33 Rp. 211,013.79

132.9211 Kg Besi Beton Tulangan @Rp. 8,667.90 Rp. 1,152,146.80

Rp. 1,961,748.09

2. Analisa Beton Bertulang Sloof Struktur ad. 1:2:31.0000 Beton cor ready mix K-225 @Rp. 598,587.50 Rp. 598,587.50

13.3300 M2 Bekisting @Rp. 39,565.33 Rp. 527,405.89

171.0900 Kg Besi Beton Tulangan @Rp. 8,667.90 Rp. 1,482,991.01

a. Analisa 1 M3 Beton ad. 1 : 2 : 3 (site mix K-225)

M3

M3

b. Analisa 1 M3 Beton ad. 1 : 2 : 3 (ready mix K-225 berikut selang)

M3

c. Analisa 1 M3 Beton ad. 1 : 3 : 5 (untuk konstruksi rabat, lantai kerja)

M3

M3

M3

M3

Page 10: Master Rab Rumah Kecil

Hal 10/46

Rp. 2,608,984.40

3. Analisa Beton Bertulang Sloof Praktis 15/20 ad. 1:2:31.0000 Beton cor ready mix K-225 @Rp. 598,587.50 Rp. 598,587.50

13.3333 M2 Bekisting @Rp. 39,565.33 Rp. 527,536.46

138.4667 Kg Besi Beton Tulangan @Rp. 8,667.90 Rp. 1,200,215.51

Rp. 2,326,339.47

4. Analisa Beton Bertulang Kolom Struktur (15/20) ad. 1:2:31.0000 Beton cor site mix K-225 @Rp. 604,707.00 Rp. 604,707.00

13.3333 M2 Bekisting @Rp. 39,565.33 Rp. 527,536.46

5.5833 btg Tiang Perancah @Rp. 7,500.00 Rp. 41,874.94

138.4667 Kg Besi Beton Tulangan @Rp. 8,667.90 Rp. 1,200,215.51

Rp. 2,374,333.91

5. Analisa Beton Bertulang Kolom Praktis 15/15 ad. 1:2:31.0000 Beton cor site mix K-225 @Rp. 604,707.00 Rp. 604,707.00

17.7778 M2 Bekisting @Rp. 39,565.33 Rp. 703,384.58

131.7333 Kg Besi Beton Tulangan @Rp. 8,667.90 Rp. 1,141,851.33

Rp. 2,449,942.91

6. Analisa Beton Bertulang Balok 15/40 ad. 1:2:31.0000 Beton cor ready mix K-225 @Rp. 598,587.50 Rp. 598,587.50

11.8300 M2 Bekisting @Rp. 39,565.33 Rp. 468,057.89

1.6670 M2 Tiang Perancah @Rp. 60,480.00 Rp. 100,820.16

213.8300 Kg Besi Beton Tulangan @Rp. 8,667.90 Rp. 1,853,457.06

Rp. 3,020,922.61

7. Analisa Beton Bertulang Balok 15/20 ad. 1:2:31.0000 Beton cor site mix K-225 @Rp. 604,707.00 Rp. 604,707.00

13.3333 M2 Bekisting @Rp. 39,565.33 Rp. 527,536.46

1.6670 M2 Tiang Perancah @Rp. 60,480.00 Rp. 100,820.16

138.4667 Kg Besi Beton Tulangan @Rp. 8,667.90 Rp. 1,200,215.51

Rp. 2,433,279.13

7. Analisa Beton Bertulang Ring Balk 15/15 ad. 1:2:31.0000 Beton cor site mix K-225 @Rp. 604,707.00 Rp. 604,707.00

17.7778 M2 Bekisting @Rp. 39,565.33 Rp. 703,384.58

1.6670 M2 Tiang Perancah @Rp. 60,480.00 Rp. 100,820.16

131.7333 Kg Besi Beton Tulangan @Rp. 8,667.90 Rp. 1,141,851.33

Rp. 2,550,763.07

8. Analisa Beton Bertulang Balok Latey 15/15 ad. 1:2:31.0000 Beton cor site mix K-225 @Rp. 604,707.00 Rp. 604,707.00

17.7778 M2 Bekisting @Rp. 39,565.33 Rp. 703,384.58

84.0000 Kg Besi Beton Tulangan @Rp. 8,667.90 Rp. 728,103.60

Rp. 2,036,195.18

9. Analisa Beton Bertulang Plat Lantai ad. 1:2:3 t = 12cm1.0000 Beton cor ready mix K-225 @Rp. 598,587.50 Rp. 598,587.50

8.3330 M2 Bekisting @Rp. 70,482.00 Rp. 587,326.51 multiplek

6.0000 M2 Tiang Perancah @Rp. 60,480.00 Rp. 362,880.00

78.4580 Kg Besi Beton Tulangan @Rp. 8,667.90 Rp. 680,066.10

Rp. 2,228,860.10

10. Analisa Beton Bertulang Plat Atap ad. 1:2:3 t = 10cm1.0000 Beton cor ready mix K-225 @Rp. 598,587.50 Rp. 598,587.50

10.0000 M2 Bekisting @Rp. 70,482.00 Rp. 704,820.00

10.0000 M2 Tiang Perancah @Rp. 60,480.00 Rp. 604,800.00

52.0026 Kg Besi Beton Tulangan @Rp. 8,667.90 Rp. 450,753.34

Rp. 2,358,960.84

M3

M3

M3

M3

M3

M3

M3

M3

M3

Page 11: Master Rab Rumah Kecil

Hal 11/46

11. Analisa Beton Bertulang Tangga ad. 1:2:3 t = 12cm1.0000 Beton cor ready mix K-225 @Rp. 598,587.50 Rp. 598,587.50

8.3350 M2 Bekisting @Rp. 70,482.00 Rp. 587,467.47

8.3520 M2 Tiang Perancah @Rp. 60,480.00 Rp. 505,128.96

171.0000 Kg Besi Beton Tulangan @Rp. 8,667.90 Rp. 1,482,210.90

Rp. 3,173,394.83

12. Analisa Beton Bertulang Dapur ad. 1:2:3 t = 8cm1.0000 Beton cor ready mix K-225 @Rp. 598,587.50 Rp. 598,587.50

12.5000 M2 Bekisting @Rp. 33,732.00 Rp. 421,650.00 multiplek

12.5000 M2 Tiang Perancah @Rp. 60,480.00 Rp. 756,000.00

48.7500 Kg Besi Beton Tulangan @Rp. 8,667.90 Rp. 422,560.13

Rp. 2,198,797.63

IV. PEKERJAAN DINDING DAN PLESTERAN

80.0000 Bh Batu Bata Merah @Rp. 400.00 Rp. 32,000.00

0.3962 Zak Semen Portland (PC) @Rp. 42,000.00 Rp. 16,640.40

0.0420 Pasir Pasang @Rp. 130,000.00 Rp. 5,460.00

0.1000 Tukang @Rp. 43,000.00 Rp. 4,300.00 15,345.00

0.0100 Kepala Tukang @Rp. 47,000.00 Rp. 470.00

0.3000 Pekerja @Rp. 33,000.00 Rp. 9,900.00

0.0150 Mandor @Rp. 45,000.00 Rp. 675.00

Rp. 69,445.40

80.0000 Bh Batu Bata Merah @Rp. 400.00 Rp. 32,000.00

0.2700 Zak Semen Portland (PC) @Rp. 42,000.00 Rp. 11,340.00

0.0450 Pasir Pasang @Rp. 130,000.00 Rp. 5,850.00

0.1000 Tukang @Rp. 43,000.00 Rp. 4,300.00 15,345.00

0.0100 Kepala Tukang @Rp. 47,000.00 Rp. 470.00

0.3000 Pekerja @Rp. 33,000.00 Rp. 9,900.00

0.0150 Mandor @Rp. 45,000.00 Rp. 675.00

Rp. 64,535.00

0.3300 Zak Semen Portland (PC) @Rp. 42,000.00 Rp. 13,860.00

0.0250 Pasir Pasang @Rp. 130,000.00 Rp. 3,250.00

0.1800 Tukang @Rp. 43,000.00 Rp. 7,740.00 21,276.00

0.0180 Kepala Tukang @Rp. 47,000.00 Rp. 846.00

0.3600 Pekerja @Rp. 33,000.00 Rp. 11,880.00

0.0180 Mandor @Rp. 45,000.00 Rp. 810.00

Rp. 38,386.00

0.1950 Zak Semen Portland (PC) @Rp. 42,000.00 Rp. 8,190.00

0.0268 Pasir Pasang @Rp. 130,000.00 Rp. 3,484.00

0.1800 Tukang @Rp. 43,000.00 Rp. 7,740.00 21,276.00

0.0180 Kepala Tukang @Rp. 47,000.00 Rp. 846.00

0.3600 Pekerja @Rp. 33,000.00 Rp. 11,880.00

0.0180 Mandor @Rp. 45,000.00 Rp. 810.00

Rp. 32,950.00

V. PEKERJAAN LANTAI

1.2000 Pasir Urug @Rp. 90,000.00 Rp. 108,000.00

0.3000 Pekerja @Rp. 33,000.00 Rp. 9,900.00 10,350.00

0.0100 Mandor @Rp. 45,000.00 Rp. 450.00

M3

M3

1. Analisa 1 M2 Pasangan Dinding Batu Bata ad. 1 : 4

M3

2. Analisa 1 M2 Pasangan Dinding Batu Bata ad. 1 : 8

M3

3. Analisa 1 M2 Plesteran ad. 1 : 4

M3

4. Analisa 1 M2 Plesteran ad. 1 : 8 tebal 2 cm

M3

1. Analisa 1 M3 Urugan Pasir Bawah LantaiM3

Page 12: Master Rab Rumah Kecil

Hal 12/46

Rp. 118,350.00

4.0000 Zak Semen Portland (PC) @Rp. 42,000.00 Rp. 168,000.00

0.5000 Pasir Pasang @Rp. 130,000.00 Rp. 65,000.00

1.0000 Koral Beton @Rp. 170,000.00 Rp. 170,000.00

0.2000 Tukang @Rp. 43,000.00 Rp. 8,600.00 49,410.00

0.0200 Kepala Tukang @Rp. 47,000.00 Rp. 940.00

1.2000 Pekerja @Rp. 33,000.00 Rp. 39,600.00

0.0060 Mandor @Rp. 45,000.00 Rp. 270.00

Rp. 452,410.00

6.5625 Bh Keramik 40 x 40 @Rp. 8,333.33 Rp. 54,687.50 6.25

0.2030 Zak Semen Portland (PC) @Rp. 42,000.00 Rp. 8,526.00

Zak Semen Putih @Rp. 55,000.00 Rp. -

0.0321 Pasir Pasang @Rp. 130,000.00 Rp. 4,173.00

0.1200 Tukang @Rp. 43,000.00 Rp. 5,160.00 14,559.00

0.0120 Kepala Tukang @Rp. 47,000.00 Rp. 564.00

0.2500 Pekerja @Rp. 33,000.00 Rp. 8,250.00

0.0130 Mandor @Rp. 45,000.00 Rp. 585.00

Rp. 81,945.50

9.6419 Bh Keramik 33 x 33 @Rp. 5,000.00 Rp. 48,209.37 9.182736455464

0.2030 Zak Semen Portland (PC) @Rp. 42,000.00 Rp. 8,526.00

Zak Semen Putih @Rp. 55,000.00 Rp. -

0.0321 Pasir Pasang @Rp. 130,000.00 Rp. 4,173.00

1.0000 Upah Tenaga @Rp. 14,559.00 Rp. 14,559.00

Rp. 75,467.37

11.6667 Bh Keramik 30 x 30 @Rp. 3,181.82 Rp. 37,121.21 11.11111111111

0.2030 Zak Semen Portland (PC) @Rp. 42,000.00 Rp. 8,526.00

Zak Semen Putih @Rp. 55,000.00 Rp. -

0.0321 Pasir Pasang @Rp. 130,000.00 Rp. 4,173.00

1.0000 Upah Tenaga @Rp. 14,559.00 Rp. 14,559.00

Rp. 64,379.21

11.6667 Bh Keramik 30 x 30 @Rp. 3,181.82 Rp. 37,121.21 16

0.2030 Zak Semen Portland (PC) @Rp. 42,000.00 Rp. 8,526.00

Zak Semen Putih @Rp. 55,000.00 Rp. -

0.0321 Pasir Pasang @Rp. 130,000.00 Rp. 4,173.00

1.0000 Upah Tenaga @Rp. 14,559.00 Rp. 14,559.00

Rp. 64,379.21

26.2500 Bh Keramik 20 x 20 @Rp. 1,280.00 Rp. 33,600.00 25

0.2030 Zak Semen Portland (PC) @Rp. 42,000.00 Rp. 8,526.00

Zak Semen Putih @Rp. 55,000.00 Rp. -

0.0321 Pasir Pasang @Rp. 130,000.00 Rp. 4,173.00

1.0000 Upah Tenaga @Rp. 14,559.00 Rp. 14,559.00

Rp. 60,858.00

12.7273 Bh Keramik 25 x 33 @Rp. 3,458.33 Rp. 44,015.15 12.12121212121

0.2030 Zak Semen Portland (PC) @Rp. 42,000.00 Rp. 8,526.00

Zak Semen Putih @Rp. 55,000.00 Rp. -

0.0321 Pasir Pasang @Rp. 130,000.00 Rp. 4,173.00

1.0000 Upah Tenaga @Rp. 14,559.00 Rp. 14,559.00

Rp. 71,273.15

21.0000 Bh Keramik 20 x 25 @Rp. 1,750.00 Rp. 36,750.00 20

2. Analisa 1 M3 Beton Tumbuk ad. 1 : 3 : 5

M3

M3

3. Analisa 1 M2 Pasangan Lantai Keramik 40 x 40 cm 1 : 6 tebal 3cm

M3

3. Analisa 1 M2 Pasangan Lantai Keramik 33 x 33 cm 1 : 6 tebal 3cm

M3

3. Analisa 1 M2 Pasangan Lantai Keramik 30 x 30 cm 1 : 6 tebal 3cm

M3

3. Analisa 1 M2 Pasangan Lantai Keramik 30 x 30 cm 1 : 6 tebal 3cm bagus

M3

3. Analisa 1 M2 Pasangan Lantai Keramik 20 x 20 cm 1 : 6 tebal 3cm

M3

3. Analisa 1 M2 Pasangan keramik dinding 25 x 33 cm 1 : 6 tebal 3cm

M3

3. Analisa 1 M2 Pasangan Keramik dinding 20 x 25 cm 1 : 6 tebal 3cm

Page 13: Master Rab Rumah Kecil

Hal 13/46

0.2030 Zak Semen Portland (PC) @Rp. 42,000.00 Rp. 8,526.00

Zak Semen Putih @Rp. 55,000.00 Rp. -

0.0321 Pasir Pasang @Rp. 130,000.00 Rp. 4,173.00

1.0000 Upah Tenaga @Rp. 14,559.00 Rp. 14,559.00

Rp. 64,008.00

4.2000 Bh Keramik 25 x 6 @Rp. 16,000.00 Rp. 67,200.00 4

0.0122 Zak Semen Portland (PC) @Rp. 42,000.00 Rp. 511.56

Zak Semen Putih @Rp. 55,000.00 Rp. -

0.0019 Pasir Pasang @Rp. 130,000.00 Rp. 250.38

0.0600 Upah Tenaga @Rp. 14,559.00 Rp. 873.54

Rp. 68,835.48

5.2500 Bh Keramik 20 x 6 @Rp. 6,000.00 Rp. 31,500.00 5

0.0122 Zak Semen Portland (PC) @Rp. 42,000.00 Rp. 511.56

Zak Semen Putih @Rp. 55,000.00 Rp. -

0.0019 Pasir Pasang @Rp. 130,000.00 Rp. 250.38

0.0600 Upah Tenaga @Rp. 14,559.00 Rp. 873.54

Rp. 33,135.48

1.2000 Batu Koral Sikat @Rp. 75,000.00 Rp. 90,000.00

0.3000 Zak Semen Portland (PC) @Rp. 42,000.00 Rp. 12,600.00

0.0321 Pasir Pasang @Rp. 130,000.00 Rp. 4,173.00

0.3500 Tukang @Rp. 43,000.00 Rp. 15,050.00 41,370.00

0.0350 Kepala Tukang @Rp. 47,000.00 Rp. 1,645.00

0.7000 Pekerja @Rp. 33,000.00 Rp. 23,100.00

0.0350 Mandor @Rp. 45,000.00 Rp. 1,575.00

Rp. 148,143.00

1.0500 Batu Alam @Rp. 130,000.00 Rp. 136,500.00

0.2030 Zak Semen Portland (PC) @Rp. 42,000.00 Rp. 8,526.00

0.0321 Pasir Pasang @Rp. 130,000.00 Rp. 4,173.00

0.3500 Tukang @Rp. 43,000.00 Rp. 15,050.00 38,505.00

0.0350 Kepala Tukang @Rp. 47,000.00 Rp. 1,645.00

0.6200 Pekerja @Rp. 33,000.00 Rp. 20,460.00

0.0300 Mandor @Rp. 45,000.00 Rp. 1,350.00

Rp. 187,704.00

5.6750 Zak Semen Portland (PC) @Rp. 42,000.00 Rp. 238,350.00

Pasir Pasang @Rp. 130,000.00 Rp. -

Koral Beton @Rp. 170,000.00 Rp. -

1.0000 Upah Tenaga @Rp. 69,975.00 Rp. 69,975.00

Rp. 308,325.00

VI. PEKERJAAN ATAP

0.2625 btg Kayu Bengkirai @Rp. 200,000.00 Rp. 52,500.00

0.0190 Kg Paku Biasa @Rp. 15,000.00 Rp. 285.00

0.0518 Tukang @Rp. 43,000.00 Rp. 2,227.40 3,080.83

0.0052 Kepala Tukang @Rp. 47,000.00 Rp. 243.65

0.0173 Pekerja @Rp. 33,000.00 Rp. 570.90

0.0009 Mandor @Rp. 45,000.00 Rp. 38.88

Rp. 55,865.83

0.5500 btg Kayu Usuk 5/7 @Rp. 85,000.00 Rp. 46,750.00

0.8250 btg Kayu Reng 2/3 @Rp. 13,000.00 Rp. 10,725.00

M3

3. Analisa 1 M1 Pasangan List Keramik 25 x 6 cm 1 : 6 tebal 3cm

M3

3. Analisa 1 M1 Pasangan List Keramik 20 x 6 cm 1 : 6 tebal 3cm

M3

8. Analisa 1 M2 Pasangan Lantai Batu Koral SikatM2

M3

9. Analisa 1 M2 Pasangan Dinding Batu AlamM2

M3

10. Analisa 1 M3 Rabat Beton ad. 1 : 2 : 3

M3

M3

1. Analisa 1 M1 Pekerjaan Murplat, Gording, Nok, Jurai

2. Analisa 1 M2 Pasang Usuk dan Reng

Page 14: Master Rab Rumah Kecil

Hal 14/46

0.2500 Kg Paku Biasa @Rp. 15,000.00 Rp. 3,750.00

0.2000 Tukang @Rp. 43,000.00 Rp. 8,600.00 16,590.00

0.0200 Kepala Tukang @Rp. 47,000.00 Rp. 940.00

0.2000 Pekerja @Rp. 33,000.00 Rp. 6,600.00

0.0100 Mandor @Rp. 45,000.00 Rp. 450.00

Rp. 77,815.00

10.0000 Bh Genteng Beton @Rp. 3,500.00 Rp. 35,000.00

0.1000 Tukang @Rp. 43,000.00 Rp. 4,300.00 11,820.00

0.0100 Kepala Tukang @Rp. 47,000.00 Rp. 470.00

0.2000 Pekerja @Rp. 33,000.00 Rp. 6,600.00

0.0100 Mandor @Rp. 45,000.00 Rp. 450.00

Rp. 46,820.00

4. Analisa 1 M' Pasang Bubungan Genteng Beton3.5000 Bh Bubungan Genteng Beton @Rp. 3,800.00 Rp. 13,300.00

0.2000 Zak Semen Portland (PC) @Rp. 42,000.00 Rp. 8,400.00

0.0330 Pasir Pasang @Rp. 130,000.00 Rp. 4,290.00

0.2000 Tukang @Rp. 43,000.00 Rp. 8,600.00 23,640.00

0.0200 Kepala Tukang @Rp. 47,000.00 Rp. 940.00

0.4000 Pekerja @Rp. 33,000.00 Rp. 13,200.00

0.0200 Mandor @Rp. 45,000.00 Rp. 900.00

Rp. 49,630.00

5. Analisa 1 M' Listplank Woodplank ex. Elephant Double0.5250 lbr Papan 2/20 @Rp. 45,000.00 Rp. 23,625.00

0.0250 Kg Paku Biasa @Rp. 15,000.00 Rp. 375.00

0.2000 Tukang @Rp. 43,000.00 Rp. 8,600.00 17,741.50

0.0520 Kepala Tukang @Rp. 47,000.00 Rp. 2,444.00

0.1900 Pekerja @Rp. 33,000.00 Rp. 6,270.00

0.0095 Mandor @Rp. 45,000.00 Rp. 427.50

Rp. 41,741.50

6. Analisa 1 M' Papan Sirip0.2625 m3 Papan 2/20 @Rp. 45,000.00 Rp. 11,812.50

0.0250 kg Paku @Rp. 15,000.00 Rp. 375.00

0.0200 Tukang @Rp. 43,000.00 Rp. 860.00 2,454.00

0.0020 Kepala Tukang @Rp. 47,000.00 Rp. 94.00

0.0400 Pekerja @Rp. 33,000.00 Rp. 1,320.00

0.0040 Mandor @Rp. 45,000.00 Rp. 180.00

Rp. 14,641.50

7. Analisa 10 M' Talang Datar dengan Papan Talang10.0000 m1 Lembar Seng @Rp. 25,000.00 Rp. 250,000.00

5.5000 lbr Papan 2/20 @Rp. 45,000.00 Rp. 247,500.00

8.0000 Tukang @Rp. 43,000.00 Rp. 344,000.00 557,850.00

0.8000 Kepala Tukang @Rp. 47,000.00 Rp. 37,600.00

5.0000 Pekerja @Rp. 33,000.00 Rp. 165,000.00

0.2500 Mandor @Rp. 45,000.00 Rp. 11,250.00

Rp. 1,055,350.00

Untuk 1 M' = 1/10 Rp. 105,535.00

VII. PEKERJAAN PLAFOND DAN RANGKA

0.3830 lbr Gypsum 12 mm @Rp. 46,000.00 Rp. 17,618.00

1.0500 btng Besi Hollow @Rp. 18,000.00 Rp. 18,900.00

0.1300 Kg Kawat Penggantung @Rp. 12,000.00 Rp. 1,560.00

38.0000 bh Skrup Board @Rp. 25.00 Rp. 950.00

2.1000 bh Skrup Join Hollow @Rp. 100.00 Rp. 210.00

3. Analisa 1 M2 Pasang Atap Genteng Beton flat

M3

1. Analisa 1 M2 Pasang Plafond Gypsum 12 mm

Page 15: Master Rab Rumah Kecil

Hal 15/46

0.0124 dos Paku Beton @Rp. 20,000.00 Rp. 248.00

0.0370 rol Lakban kain @Rp. 15,000.00 Rp. 555.00

0.0247 zak Compound @Rp. 60,000.00 Rp. 1,482.00

0.4000 Tukang @Rp. 43,000.00 Rp. 17,200.00 23,010.00

0.0400 Kepala Tukang @Rp. 47,000.00 Rp. 1,880.00

0.1000 Pekerja @Rp. 33,000.00 Rp. 3,300.00

0.0140 Mandor @Rp. 45,000.00 Rp. 630.00

Rp. 64,533.00

0.3830 lbr Kalsiboard 4,5 mm @Rp. 46,000.00 Rp. 17,618.00

1.0500 btng Besi Hollow @Rp. 18,000.00 Rp. 18,900.00

0.1300 Kg Kawat Penggantung @Rp. 12,000.00 Rp. 1,560.00

38.0000 bh Skrup Board @Rp. 25.00 Rp. 950.00

2.1000 bh Skrup Join Hollow @Rp. 100.00 Rp. 210.00

0.0124 dos Paku Beton @Rp. 20,000.00 Rp. 248.00

0.0370 rol Lakban kain @Rp. 15,000.00 Rp. 555.00

0.0247 zak Compound @Rp. 60,000.00 Rp. 1,482.00

0.4000 Tukang @Rp. 43,000.00 Rp. 17,200.00 23,010.00

0.0400 Kepala Tukang @Rp. 47,000.00 Rp. 1,880.00

0.1000 Pekerja @Rp. 33,000.00 Rp. 3,300.00

0.0140 Mandor @Rp. 45,000.00 Rp. 630.00

Rp. 64,533.00

3. Analisa 10 M' Pasang List Profil Gypsum10.0000 m' List Gypsum @Rp. 12,000.00 Rp. 120,000.00

0.5000 Tukang @Rp. 43,000.00 Rp. 21,500.00 41,700.00

0.0500 Kepala Tukang @Rp. 47,000.00 Rp. 2,350.00

0.5000 Pekerja @Rp. 33,000.00 Rp. 16,500.00

0.0300 Mandor @Rp. 45,000.00 Rp. 1,350.00

Rp. 161,700.00

Untuk 1 M' = 1/10 Rp. 16,170.00

VIII. PEKERJAAN PINTU DAN JENDELA

1.1000 Kayu Jati @Rp. 6,000,000.00 Rp. 6,600,000.00

22.5000 Tukang @Rp. 43,000.00 Rp. 967,500.00 1,387,125.00

2.2500 Kepala Tukang @Rp. 47,000.00 Rp. 105,750.00

9.0000 Pekerja @Rp. 33,000.00 Rp. 297,000.00

0.3750 Mandor @Rp. 45,000.00 Rp. 16,875.00

Rp. 7,987,125.00

2. Analisa 1 M2 Daun Pintu Panil Jati (KW II)0.0350 m3 Kayu Jati @Rp. 6,000,000.00 Rp. 210,000.00

0.1000 kg Paku Biasa @Rp. 15,000.00 Rp. 1,500.00

5.0000 Tukang @Rp. 43,000.00 Rp. 215,000.00 296,662.50

0.5000 Kepala Tukang @Rp. 47,000.00 Rp. 23,500.00

1.6500 Pekerja @Rp. 33,000.00 Rp. 54,450.00

0.0825 Mandor @Rp. 45,000.00 Rp. 3,712.50

Rp. 508,162.50

0.0132 m3 Kayu Jati @Rp. 6,000,000.00 Rp. 79,200.00

0.7500 m2 Kaca Bening 5mm @Rp. 60,000.00 Rp. 45,000.00

4.0000 Tukang @Rp. 43,000.00 Rp. 172,000.00 237,060.00

0.4000 Kepala Tukang @Rp. 47,000.00 Rp. 18,800.00

1.3200 Pekerja @Rp. 33,000.00 Rp. 43,560.00

0.0600 Mandor @Rp. 45,000.00 Rp. 2,700.00

Rp. 361,260.00

2. Analisa 1 M2 Pasang Plafond Kalsiboard 4,5 mm

1. Analisa 1 M3 Kusen Kayu Jati (KW II)M3

3. Analisa 1 M2 Daun Jendela Jati Kaca Bening 5 mm (KW II)

Page 16: Master Rab Rumah Kecil

Hal 16/46

1.1000 m2 Kaca Bening 5mm @Rp. 60,000.00 Rp. 66,000.00

0.0150 Tukang @Rp. 60,000.00 Rp. 900.00 8,079.75

0.1500 Kepala Tukang @Rp. 43,000.00 Rp. 6,450.00

0.0150 Pekerja @Rp. 47,000.00 Rp. 705.00

0.0008 Mandor @Rp. 33,000.00 Rp. 24.75

Rp. 74,079.75

1.1000 m2 Kaca Bening 10mm @Rp. 250,000.00 Rp. 275,000.00

0.0150 Tukang @Rp. 60,000.00 Rp. 900.00 8,079.75

0.1500 Kepala Tukang @Rp. 43,000.00 Rp. 6,450.00

0.0150 Pekerja @Rp. 47,000.00 Rp. 705.00

0.0008 Mandor @Rp. 33,000.00 Rp. 24.75

Rp. 283,079.75

IX. PEKERJAAN PENGECATAN

1.6670 Kg Cat Tembok 2x @Rp. 70,000.00 Rp. 116,690.00

0.8330 Kg Alkali 1x @Rp. 23,750.00 Rp. 19,783.75

2.0000 Lbr Amplas Biasa @Rp. 600.00 Rp. 1,200.00

0.1000 bh Rol cat @Rp. 12,500.00 Rp. 1,250.00

1.0000 Stegger @Rp. 5,000.00 Rp. 5,000.00

0.6300 Tukang @Rp. 43,000.00 Rp. 27,090.00 37,776.00

0.0630 Kepala Tukang @Rp. 47,000.00 Rp. 2,961.00

0.2000 Pekerja @Rp. 33,000.00 Rp. 6,600.00

0.0250 Mandor @Rp. 45,000.00 Rp. 1,125.00

Rp. 181,699.75

Rp. 18,169.98

1.6670 Kg Cat Tembok 2x @Rp. 26,000.00 Rp. 43,342.00

0.8330 Kg Alkali 1x @Rp. 23,750.00 Rp. 19,783.75

2.0000 Lbr Amplas Biasa @Rp. 600.00 Rp. 1,200.00

0.1000 bh Rol cat @Rp. 12,500.00 Rp. 1,250.00

1.0000 Stegger @Rp. 5,000.00 Rp. 5,000.00

1.0000 Upah Tenaga @Rp. 37,776.00 Rp. 37,776.00

Rp. 108,351.75

Rp. 10,835.18

1.6670 Kg Cat Tembok 2x @Rp. 55,000.00 Rp. 91,685.00

0.8330 Kg Alkali 1x @Rp. 23,750.00 Rp. 19,783.75

2.0000 Lbr Amplas Biasa @Rp. 600.00 Rp. 1,200.00

0.1000 bh Rol cat @Rp. 12,500.00 Rp. 1,250.00

1.0000 Stegger @Rp. 5,000.00 Rp. 5,000.00

1.0000 Upah Tenaga @Rp. 37,776.00 Rp. 37,776.00

Rp. 156,694.75

Rp. 15,669.48

3.7500 Kg Cat Tembok 3x @Rp. 18,000.00 Rp. 67,500.00

0.5000 Lbr Amplas Biasa @Rp. 600.00 Rp. 300.00

0.0100 bh Rol cat @Rp. 12,500.00 Rp. 125.00

1.0000 Stegger @Rp. 5,000.00 Rp. 5,000.00

1.0000 Upah Tenaga @Rp. 37,776.00 Rp. 37,776.00

Rp. 110,701.00

Rp. 11,070.10

2.0000 Kg Coating Sicosol @Rp. 45,000.00 Rp. 90,000.00

0.3500 Tukang @Rp. 43,000.00 Rp. 15,050.00 41,370.00

4. Analisa 1 M2 Jendela Mati Kaca Bening 5 mm

5. Analisa 1 M2 Jendela Mati Kaca Bening 10 mm

1. Analisa 10 M2 Pengecatan Tembok 3x sapu Eksterior ex. Dulux

Untuk 1 M2

1. Analisa 10 M2 Pengecatan Tembok 3x sapu Eksterior ex. Flinkote

Untuk 1 M2

1. Analisa 10 M2 Pengecatan Tembok 3x sapu Eksterior ex. Mowilex

Untuk 1 M2

2. Analisa 10 M2 Pengecatan Tembok 3x sapu Interior ex. Catylac

Untuk 1 M2

3. Analisa 10 M2 Coating Batu Alam

Page 17: Master Rab Rumah Kecil

Hal 17/46

0.0350 Kepala Tukang @Rp. 47,000.00 Rp. 1,645.00

0.7000 Pekerja @Rp. 33,000.00 Rp. 23,100.00

0.0350 Mandor @Rp. 45,000.00 Rp. 1,575.00

Rp. 131,370.00

Rp. 13,137.00

2.8400 Kg Cat Kilat @Rp. 60,000.00 Rp. 170,400.00

1.4200 Kg Cat Dasar @Rp. 20,000.00 Rp. 28,400.00

2.0000 Ltr Minyak Cat @Rp. 5,500.00 Rp. 11,000.00

1.2000 Kg Cat Meni Nippon @Rp. 15,000.00 Rp. 18,000.00

0.8000 Kg Plamir kayu @Rp. 11,000.00 Rp. 8,800.00

3.0000 Lbr Amplas Niken @Rp. 2,500.00 Rp. 7,500.00

2.2500 Tukang @Rp. 43,000.00 Rp. 96,750.00 160,200.00

0.2250 Kepala Tukang @Rp. 47,000.00 Rp. 10,575.00

1.5000 Pekerja @Rp. 33,000.00 Rp. 49,500.00

0.0750 Mandor @Rp. 45,000.00 Rp. 3,375.00

Rp. 404,300.00

Rp. 6,064.50

2.5000 Kg Cat Tembok maxilite @Rp. 8,800.00 Rp. 22,000.00

1.0000 Ls Alat Bantu / Steiger @Rp. 12,000.00 Rp. 12,000.00

0.6300 Tukang @Rp. 43,000.00 Rp. 27,090.00 37,776.00

0.0630 Kepala Tukang @Rp. 47,000.00 Rp. 2,961.00

0.2000 Pekerja @Rp. 33,000.00 Rp. 6,600.00

0.0250 Mandor @Rp. 45,000.00 Rp. 1,125.00

Rp. 71,776.00

Rp. 7,177.60

X. PEKERJAAN LAIN-LAIN

0.7500 Pekerja @Rp. 33,000.00 Rp. 24,750.00 26,437.50

0.0375 Mandor @Rp. 45,000.00 Rp. 1,687.50

Rp. 26,437.50

Rp. 2,643.75

Untuk 1 M2

4. Analisa 10 M2 Pengecatan Kayu Mengkilat 3x sapu

Untuk 1 M1

5. Analisa 10 M2 Cat Plafond 3x sapu

Untuk 1 M2

1. Analisa 10 M2 Analisa Pembersihan Akhir Lapangan

Untuk 1 M2 = 1/10

Page 18: Master Rab Rumah Kecil

nama

luas tanah 144.700

luas lt 1 89.700

luas lt 2 76.580

166.280 luas thp 1

t1

bowplang 48.000

pondasi 48.710

41.780

90.490

t1

galian tanah pondasi

0.831 75.224

urugan tanah kembali

25.075

urugan pasir

0.070 6.334

anstamping

0.140 12.669

pondasi batu belah

0.300 27.371

footplat

26.000 0.107 2.776 lantai kerja

0.034 0.878 0.832

3.653

slof 15/20

0.000

0.000 0.030 0.000

slof 15/25

90.490

-2.830

6.000

0.000

93.660 0.038 3.512

kolom praktis

tahap 1 tahap 2

0.023 0.799 0.023 1.013

KOLOM tahap 1 tahap 2

0.060 0.000 0.060 0.000

15 30 0.045 4.075 0.045 2.363

TAHAP 1 RUMAH LB=89,7 / LT=144,7 m2

TAHAP 2 RUMAH LB=76,58 / LT=144,7 m2

TAHAP 1+2 RUMAH LB=166,28/ LT=144,7 m2

Page 19: Master Rab Rumah Kecil

15 25 0.038 0.000 0.038 0.000

15 20 0.030 0.000 0.030 0.000

20 20 0.560

tahap 1

BALOK

15 30 51.450 20 40 0.608

51.520

0.000

102.970 0.027 3.388

15 25

0.000

0.000 0.020 0.000

15 20

ring balk 13.450

konsol

gunungan1

balok latey1 16.110

29.560 0.030 0.887

15 15

0.023 0.000

tahap 2

15 30 17.670

6.100

0.000

23.770 0.045 1.070

15 25

Page 20: Master Rab Rumah Kecil

0.000

0.000 0.063 0.000

RING BALK

15 20 31.550

26.400

latey 15/20

gunungan 0.000 0.866

0.000 0.866

0.000 0.866

0.000 0.866

0.000 0.866

0.000 0.866

57.950 0.030 1.738

plat 12 cm tahap 1

82.350

82.350 0.120 9.882

plat 12 cm tahap 2

0.000 0.120 0.000

plat 10 cm tahap 1

0.000 0.100 0.000

plat 10 cm tahap 2

17.380

17.380 0.100 1.738

lefel 8 cm tahap1

2.136

4.200 6.336

kantilefer

2.800 dapur

9.136 0.080 1.614

lefel 8 tahap 2

16.180

.

dapur

16.180 0.080 1.294

Page 21: Master Rab Rumah Kecil

waterproof 125.046 0.000

compound 39.896

PLAT TANGGA

1.080

1.080

DINDING

TAHAP 1

total pelubang eksterior interior

lt1 260.960 281.532 dinding pagar

45.140 samping 19.600

36.050 31.360

81.190 3.400 271.246

plesteran 542.492

lt2 175.780 162.960

29.350

31.100

60.450 3.400 169.370

plesteran 338.740

lt3

0.000 0.000

0.000 3.550 0.000

plesteran 0.000

tahap 1 jumlah luas panjang unting luas total pjg total d kayu d kaca

P1 1.000 6.700 7.640 2.000 0.075 6.700 7.790

P2 4.000 2.300 5.840 2.000 0.075 9.200 23.960

P3 2.000 1.780 5.140 2.000 0.075 3.560 10.580

PJ1 1.000 6.300 13.200 4.000 0.075 6.300 13.500

PJ2 6.300 13.200 4.000 0.075 0.000 0.000

PJ3 4.800 12.200 3.000 0.075 0.000 0.000

J1 4.400 11.960 4.000 0.075 0.000 0.000

J2 3.800 11.520 4.000 0.075 0.000 0.000

J3 4.000 2.600 8.340 4.000 0.075 10.400 34.560

j4 1.800 7.080 4.000 0.075 0.000 0.000

36.160 90.390 0.000 0.000

melamin 72.320

a. Engsel pintu (per pintu 3 bh / 1,5 psng)

b. Kunci tanam 2x slag + handle

c. Door stoper

TAHAP 2 jumlah luas panjang unting luas total pjg total d kayu d kaca

P1 6.700 7.640 2.000 0.075 0.000 0.000

P2 2.000 2.300 5.840 2.000 0.075 4.600 11.980

P3 1.000 1.780 5.140 2.000 0.075 1.780 5.290

PJ1 6.300 13.200 4.000 0.075 0.000 0.000

PJ2 1.000 6.300 13.200 4.000 0.075 6.300 13.500

PJ3 1.000 4.800 12.200 3.000 0.075 4.800 12.425

Page 22: Master Rab Rumah Kecil

J1 1.000 4.400 11.960 4.000 0.075 4.400 12.260

J2 1.000 3.800 11.520 4.000 0.075 3.800 11.820

J3 3.000 2.600 8.340 4.000 0.075 7.800 25.920

j4 1.000 1.800 7.080 4.000 0.075 1.800 7.380

35.280 100.575 0.000 0.000

melamin 70.560

a. Engsel pintu (per pintu 3 bh / 1,5 psng)

b. Kunci tanam 2x slag + handle

c. Door stoper

TAHAP 1 TAHAP 2

pasang batu andesit susun sirih

pasang batu alam 20.100

BETON TUMBUK

t1 t2

95.700 0.050 4.785

T1 T2

karpot

K50

k40 74.700 45.100

K33 6.150 19.430

k30 5.900 2.100

K2525

K2533 24.720 9.860

K2020

K2025

kol kolan 70.420 54.760

ps urug 4.785

PEKERJAAN ATAP

talang 1 talang 2

8.000

0.000 0.866 8.000 0.866

0.000 9.238

luas atap

tahap 1 tahap2

89.900

0.000 0.86603 0.000 89.900 0.866025 103.808

KERPUS

t1 t2

27.240

Page 23: Master Rab Rumah Kecil

0.000 0.866 27.240 0.866

0.000 37.204

Pas. Listplank T1 T2

40.500 0.8660250.866025

0.000 40.500

pasang gording T1 T2

0.000 0.000

PLAFOND T1 T2

75.800 63.100

75.800 63.100

LIS T1 T2

89.800 61.200

89.800 61.200

TRITISAN T1 T2

29.840

0.000 29.840

pipa

tahap 1 tahap 2

5" 4" 3" 3/4" 1/2" panas 4" 3" 3/4" 1/2" panas

23.000 12.000 31.600 10.000 12.000 10.000 13.000

25.000 20.500

11.800 42.000

Page 24: Master Rab Rumah Kecil

5" 4" 3" 3/4" 1/2" panas 4" 3" 1/2" 1/2" panas

23.000 0.000 48.800 73.600 10.000 0.000 12.000 30.500 13.000

X. PEKERJAAN LAIN-LAIN t1 t2

1 Pasang railing besi tempa 11.06 19.900

2 Pasang lampu gantung 1.00 1.000 bh

3 Pasang lampu downlight SL 11.00 10.000 bh

4 Pasang lampu SL tempel bh

5 Pasang lampu taman 1.00 bh

6 Pasang lampu uplight kolam bh

7 Pasang lampu spot dinding bh

8 Pasang lampu downlight halogen 6.00 6.000 bh

9 Pasang saklar 10.00 8.000 bh

10 Pasang stop kontak 13.00 10.000 bh

11 Pasang titik lampu + stop kontak 32.00 27.00 bh

12 Pasang MCB 1.00 1.000 bh

13 Pipa PVC diameter 5" D 23.00

14 Pipa PVC diameter 4" D 0.00 0.000

15 Pipa PVC diameter 3" D 48.80 12.000

16 Pipa PVC diameter 3/4" AW 73.60 30.500

17 Pipa PVC diameter 1/2 " AW air panas 10.00 13.000

18 Kran tempel 3.00 2.000 bh

19 Floor drain (avour) 2.00 7.000 bh

20 Kloset duduk 2.00 1.000 bh

21 Kloset jongkok bh

22 Kitchen zink 1.00 bh

23 wastafel

24 Keran panas dingin 1.00 1.00 bh

25 Pembersihan akhir 89.70 76.580

pagar

panjang

galian tanah pondasi

0.831 0.000

urugan tanah kembali

0.000

urugan pasir

0.070 0.000

anstamping

0.140 0.000

pondasi batu belah

0.300 0.000

m1

m1

m1

m1

m1

m1

m2

Page 25: Master Rab Rumah Kecil

slof 15/20

0.000

0.000

0.000 0.030 0.000

kolom praktis0.023 2.250 0.000

ring balk 15/20

0.000 0.030 0.000

Pas. Dinding Bata adukan 1 : 8

0

Plesteran Dinding Bata adukan 1 : 8

0

Page 26: Master Rab Rumah Kecil
Page 27: Master Rab Rumah Kecil

d jendela bv roster skonengan tatapan melamin pintu

1.000 7.640 7.640 0.000 0.000

5.840 23.360 0.000 0.000

5.140 10.280 0.000 0.000

0.000 0.000 0.000

8.680

8.680

8.480

1.000 18.000 8.410 0.000 0.000 0.000

7.800 0.000 0.000 0.000

6.480 25.920 0.000 0.000

6.360 0.000 0.000 0.000

0.000 0.000 0.000

0.000 2.000 18.000 67.200 0.000 0.000

0.000

d jendela bv roster skonengan tatapan melamin pintu

1.000 7.640 0.000 0.000 0.000

5.840 11.680 0.000 0.000

5.140 5.140 0.000 0.000

0.000 0.000 0.000

8.680

8.680

8.480

Page 28: Master Rab Rumah Kecil

1.000 18.000 8.410 8.410 0.000 0.000

7.800 7.800 0.000 0.000

6.480 19.440 0.000 0.000

6.360 6.360 0.000 0.000

58.830 0.000 0.000

0.000 2.000 18.000 0.000

Page 29: Master Rab Rumah Kecil

Halaman 29/46RENCANA ANGGARAN BIAYA (KESELURUHAN)

PROYEK RUMAH TINGGAL TYPE 46/90 M2 (Bpk. REDY)

NO URAIAN PEKERJAAN Volume SATharga satuan JUMLAH BOBOT

(Rp) (Rp) %

I. PEKERJAAN PERSIAPAN

1 Pembersihan lapangan 90.00 5,550.00 499,500.00 0.42

2 Pengukuran dan pasang bouwplank 42.00 16,395.00 688,590.00 0.58

3 Air Kerja dan Listrik 2.00 bln 300,000.00 600,000.00 0.50

4 Bedeng Dan Gudang 1.00 ls ### 2,000,000.00 1.67

5 Mobilisasi & demobilisasi 2.00 bln 500,000.00 1,000,000.00 0.84

4,788,090.00 4.00

II. PEKERJAAN PONDASI

1 Galian tanah pondasi 58.72 25,875.00 1,519,380.00 1.27

2 Urugan tanah kembali bekas galian 14.70 8,628.00 126,831.60 0.11

3 Urugan pasir bawah pondasi 4.95 118,350.00 585,832.50 0.49

4 Pasangan pondasi batu belah ad 1 : 8 21.05 401,095.00 8,443,049.75 7.05

5 Pasangan Rolag batu belah ad 1 : 8 0.70 401,095.00 280,766.50 0.23

10,955,860.35 9.15

III. PEK. BETON BERTULANG Ad. 1:2:3

1 Sloof 15/20 1.94 2,608,984.40 5,061,429.74 4.23

2 Kolom Praktis 15/15 Lt.1 2.16 2,449,942.91 5,291,876.69 4.42

3 Balok Latey 15/20 Lt.1 0.40 2,550,763.07 1,020,305.23 0.85

4 Leufel t = 8 cm Lt.1 0.48 2,198,797.63 1,055,422.86 0.88

5 Plat dapur t = 8 cm 0.09 2,198,797.63 197,891.79 0.17

6 Kuda-kuda beton 15/20 0.70 2,550,763.07 1,785,534.15 1.49

7 Ringbalk 15/20 1.67 2,550,763.07 4,259,774.33 3.56

18,672,234.80 15.60

IV. PEKERJAAN DINDING DAN PLESTERAN

1 Pas. Dinding Bata adukan 1 : 8 Lt.1 229.97 64,535.00 14,841,113.95 12.40

2 Plesteran Dinding Bata adukan 1 : 8 Lt.1 442.62 32,950.00 14,584,329.00 12.18

3 Tali air Aluminium 1.30 15,000.00 19,500.00 0.02

4 Batu Alam andesit garis 2.22 187,704.00 416,702.88 0.35

5 Batu Alam acak 3.20 187,704.00 600,652.80 0.50

30,462,298.63 25.45

V. PEKERJAAN LANTAI

1 Rabat Beton Tumbuk t = 5 cm 2.50 452,410.00 1,131,025.00 0.94

2 Pasir Urug Bawah Lantai t=3 cm 1.50 118,350.00 177,525.00 0.15

3 Pas. Keramik 40/40 Ruangan ex. Platinum 41.37 81,945.50 3,390,085.34 2.83

4 Pas. Keramik 30/30 Teras,garasi ex. Platinum 5.85 64,379.21 376,618.39 0.31

5 Pas. Keramik Lantai KM/WC 25/25 ex Platinum 2.62 60,858.00 159,447.96 0.13

6 Pas. Keramik Dinding KM/WC 25/33 ex Platinum 10.40 80,590.00 838,136.00 0.70

7 Pas. List Keramik KM/WC 6/25 ex. Platinum 5.20 M' 68,835.48 357,944.50 0.30

8 Pas. Keramik Dapur 20/20 ex Platinum 3.00 72,340.00 217,020.00 0.18

9 Perkerasan Paving Carport 13.50 77,500.00 1,046,250.00 0.87

m2

m1

m3

m3

m3

m3

m3

M3

M3

M3

M3

M3

M3

M3

M2

M2

M2

M2

M2

M3

M3

M2

M2

M2

M2

M2

M2

Page 30: Master Rab Rumah Kecil

Halaman 30/46RENCANA ANGGARAN BIAYA (KESELURUHAN)

PROYEK RUMAH TINGGAL TYPE 46/90 M2 (Bpk. REDY)

NO URAIAN PEKERJAAN Volume SATharga satuan JUMLAH BOBOT

(Rp) (Rp) %

7,694,052.18 6.43

VI. PEKERJAAN ATAP

1 Pas. Rangka Atap Baja Ringan biasa 64.00 90,000.00 5,760,000.00 4.81

2 Pas. Gording CNP 44.60 40,000.00 1,784,000.00 1.49

3 Pas. Atap Genteng Beton Flat ex. Cemara 64.00 46,820.00 2,996,480.00 2.50

4 Pas. Aluminium Foil 64.00 10,000.00 640,000.00 0.53

5 Pas. Kerpus Genteng 6.60 M' 49,630.00 327,558.00 0.27

6 Pas. Genteng Tepi 5.90 M' 25,000.00 147,500.00 0.12

7 Pas. Listplank Woodplank ex. Elephant 18.50 M' 41,741.50 772,217.75 0.65

12,427,755.75 10.38

VII. PEKERJAAN PLAFOND DAN RANGKA

1 Pasang Plafond Gypsum 9 mm ex. Elephant 40.25 64,533.00 2,597,453.25 2.17

2 Pasang List Profil Gypsum Ruangan 56.75 M' 16,170.00 917,647.50 0.77

3 Pasang Plafond Kalsiboard (Tritisan) 12.77 64,533.00 824,086.41 0.69

4,339,187.16 3.62

VIII. PEKERJAAN PINTU DAN JENDELA

1 Kusen Aluminium 4" coklat 60.45 M' 55,000.00 3,324,750.00 2.78

2 Tatapan Pintu 20.10 M' 10,000.00 201,000.00 0.17

3 Daun Pintu Panil 4.00 lbr ### 5,400,000.00 4.51

4 Daun Pintu PVC 1.00 lbr 250,000.00 250,000.00 0.21

5 Daun Jendela Aluminium + Kaca Bening 5mm 7.00 lbr 450,000.00 3,150,000.00 2.63

6 Daun Jendela Aluminium + Kaca Bening 5mm BV 1.00 lbr 325,000.00 325,000.00 0.27

7 Kaca mati 5mm 1.60 bh 74,079.75 118,527.60 0.10

8 Pekerjaan Aksesoris Pintu dan Jendela :

a. Engsel Pintu (per pintu 3 bh/1,5 Pasang) ex So 6.00 psng 35,000.00 210,000.00 0.18

b. Kunci Tanam 2x Slag Pintu Ruangan ex. SES 4.00 bh 105,000.00 420,000.00 0.35

c. Handle Pintu Ruangan ex. Dexon 4.00 bh 60,000.00 240,000.00 0.20

d. Door Stoper ex. Gerber 4.00 bh 22,500.00 90,000.00 0.08

13,729,277.60 11.47

IX. PEKERJAAN PENGECATAN

1 Pengecatan tembok ext mowilex 86.71 15,669.48 1,358,700.18 1.14

2 Pengecatan tembok interior Eco Emulsion 144.58 11,070.10 1,600,515.06 1.34

3 Pengecatan plafond 3 x sapu Maxilite 59.04 7,177.60 423,765.50 0.35

4 Melamin daun pintu panil 13.86 65,000.00 900,900.00 0.75

5 Cat Lis Plafond Gypsum ex. Maxilite 56.75 1,500.00 85,125.00 0.07

6 Coating Batu Alam ex. Propan Stone Care 5.42 13,137.00 71,202.54 0.06

7 Compound Plat Leufel 6.02 15,000.00 90,300.00 0.08

8 Cat Genteng 64.00 7,177.60 459,366.40 0.38

9 Pengecatan listplank 18.50 6,064.50 112,193.25 0.09

5,102,067.93 4.26

M2

M2

M2

M2

M2

M2

m3

m2

m2

m2

m1

m2

m2

m2

m2

Page 31: Master Rab Rumah Kecil

Halaman 31/46RENCANA ANGGARAN BIAYA (KESELURUHAN)

PROYEK RUMAH TINGGAL TYPE 46/90 M2 (Bpk. REDY)

NO URAIAN PEKERJAAN Volume SATharga satuan JUMLAH BOBOT

(Rp) (Rp) %

X. PEKERJAAN LAIN-LAIN

1 Pasang Lampu Taman ex. Zetalux 2.00 bh 155,000.00 310,000.00 0.26

2 Pasang Lampu Fitting SL ex. Philips 7.00 bh 40,000.00 280,000.00 0.23

3 Pasang Lampu Halogen 2.00 bh 75,000.00 150,000.00 0.13

4 Pasang Saklar Tunggal ex.Clipsal 3.00 bh 15,000.00 45,000.00 0.04

5 Pasang Saklar Ganda ex.Clipsal 4.00 bh 20,000.00 80,000.00 0.07

6 Pasang Stop Kontak ex.Broco 5.00 bh 20,000.00 100,000.00 0.08

7 Pasang Titik Lampu + Stop Kontak ex. Supreme 16.00 bh 75,000.00 1,200,000.00 1.00

8 Pasang Panel MCB 6 Group 1.00 bh 300,000.00 300,000.00 0.25

9 Pasang Stop Kontak AC ex.Broco 2.00 bh 45,000.00 90,000.00 0.08

10 Pasang Socket Telepon + Instalasi 1.00 bh 70,000.00 70,000.00 0.06

11 Pasang Socket Antene TV + Instalasi 1.00 bh 70,000.00 70,000.00 0.06

12 Monoblok + Jet Shower ex.HCG 1.00 bh ### 1,350,000.00 1.13

13 Kran Tempel Plastik 2.00 bh 30,000.00 60,000.00 0.05

14 Wash bak 1.00 bh 225,000.00 225,000.00 0.19

15 Kran Bebek dapur 1.00 bh 100,000.00 100,000.00 0.08

16 Kran Shower dingin ex. Washer 1.00 bh 350,000.00 350,000.00 0.29

17 Floor Drain 1.00 bh 32,500.00 32,500.00 0.03

18 Pipa PVC diameter 4" D ex. Wafin 13.00 M' 29,000.00 377,000.00 0.31

19 Pipa PVC diameter 3" D ex. Wafin 30.00 M' 19,000.00 570,000.00 0.48

20 Pipa PVC diameter 3/4" D ex. Maspion AW 29.00 M' 9,000.00 261,000.00 0.22

21 Pipa PVC diameter 1/2" D ex. Maspion AW 15.00 M' 7,000.00 105,000.00 0.09

22 Bak Tandon Air 3000 Lt (bawah) 1.00 M' ### 3,000,000.00 2.51

23 Septictank & Peresapan 1.00 bh ### 1,600,000.00 1.34

24 Pompa Air Shimizu 1.00 bh 450,000.00 450,000.00 0.38

25 Bak Kontrol 2.00 bh 60,000.00 120,000.00 0.10

26 Pembersihan Akhir 90.00 2,643.75 237,937.50 0.20

### 9.63

TOTAL BIAYA PEKERJAAN ### 100.00

2,602,266.56

M2

Page 32: Master Rab Rumah Kecil

tenaga+material

Page 32

KESELURUHAN

Page 33: Master Rab Rumah Kecil

tenaga+material

Page 33

1 1

1

Page 34: Master Rab Rumah Kecil

tenaga

Page 34

KEBUTUHAN TENAGA

Page 35: Master Rab Rumah Kecil

tenaga

Page 35

0 1

3

Page 36: Master Rab Rumah Kecil

material

Page 36

KEBUTUHAN MATERIAL

Page 37: Master Rab Rumah Kecil

material

Page 37

0 1

2

Page 38: Master Rab Rumah Kecil

REKAPITULASI RAB PROYEK RUMAH TINGGAL TYPE 46/90 M2 (Bpk. REDY)

BANGKA

NO. URAIAN PEKERJAAN NILAI NILAIPEKERJAAN BOBOT

I. PEKERJAAN PERSIAPAN Rp. 4,788,090.00 4.00

II. PEKERJAAN PONDASI Rp. 10,955,860.35 9.15

III. PEK. BETON BERTULANG Ad. 1:2:3 Rp. 18,672,234.80 15.60

IV. PEKERJAAN DINDING DAN PLESTERAN Rp. 30,462,298.63 25.45

V. PEKERJAAN LANTAI Rp. 7,694,052.18 6.43

VI. PEKERJAAN ATAP Rp. 12,427,755.75 10.38

VII. PEKERJAAN PLAFOND DAN RANGKA Rp. 4,339,187.16 3.62

VIII. PEKERJAAN PINTU DAN JENDELA Rp. 13,729,277.60 11.47

IX. PEKERJAAN PENGECATAN Rp. 5,102,067.93 4.26

X. PEKERJAAN LAIN-LAIN Rp. 11,533,437.50 9.63

JUMLAH Rp. 119,704,261.90 100

Total Biaya Konstruksi Gedung Rp. 119,704,261.90

Semarang, Agustus 2011

Dibuat Oleh :

Ali Muhtarom, ST

Page 39: Master Rab Rumah Kecil

TIME SCHEDULEBANGKA

Durasi Bobot 1 2 3 4 Skala

KeteranganNo. Jenis Pekerjaan (Minggu) % 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 %

1 Pekerjaan Persiapan 1 4.00 4.00 100 Masa

Pelaksa-

2 Pekerjaan Pondasi 2 9.15 4.58 4.58 naan

4 bulan

3 Pek. Beton Bertulang 9 15.60 1.73 1.73 1.73 1.73 1.73 1.73 1.73 1.73 1.73

4 Pek. Dinding&Plesteran 11 25.45 2.31 2.31 2.31 2.31 2.31 2.31 2.31 2.31 2.31 2.31 2.31

5 Pekerjaan Lantai 4 6.43 1.61 1.61 1.61 1.61

50

6 Pekerjaan Atap 2 10.38 5.19 5.19 Masa

Pemeli-

7 Pek. Plafond & Rangka 4 3.62 0.91 0.91 0.91 0.91 haraan

1 bulan

8 Pek. Pintu & Jendela 4 11.47 2.87 2.87 2.87 2.87

9 Pekerjaan Pengecatan 5 4.26 0.85 0.85 0.85 0.85 0.85

10 Pekerjaan Lain-Lain 9 9.63 1.07 1.07 1.07 1.07 1.07 1.07 1.07 1.07 1.07 0

51

100

Rencana Prestasi Per Minggu (%) 8.58 6.31 4.05 4.05 4.05 4.05 4.05 5.12 5.12 6.02 12.35 14.81 9.62 6.40 3.53 1.92

Kumulatif Rencana Prestasi Per Minggu (%) 8.58 14.89 18.93 22.98 27.03 31.07 35.12 40.24 45.35 51.38 63.73 78.53 88.15 94.55 98.08 100.00

Termyn per dua minggu

17,818

,643

9,687,9

85

9,687,9

85

10,969

,478

13,3

35,768

32,507

,501

19,16

9,575

6,527,3

26

Akumulasi Termyn

17,818

,643

27,506

,628

37,194

,614

48,164

,092

61,4

99,860

94,007

,361

113,1

76,93

6

119,70

4,262

Page 40: Master Rab Rumah Kecil

Hal 40/46URAIAN BAHAN BANGUNANPROYEK RUMAH TINGGAL TYPE 46/90 M2 (Bpk. REDY)

NO URAIAN PEKERJAAN VOLUME SATUAN SATUAN

I PEKERJAAN PONDASI1 Pasang Bowplank 42.00 m1 Papan cor 0.200 8.40 lbr

Usuk cor 4/6 0.600 25.20 btg Paku 0.100 4.20 kg

2 Urugan Pasir Bawah Pondasi 4.95 m3 Pasir Urug 1.200 5.94 m3 3 Anstamping Batu belah m3 Batu Kali 1.100 0.00 m3

Pasir urug 0.500 0.00 m3 4 Pas Pondasi Batu Kali 1:8 21.75 m3 Batu Kali 1.200 26.10 m3

Semen 2.400 52.20 zag

Pasir 0.760 16.53 m3

II PEKERJAAN BETON BERTULANG1 Pondasi voet plat besar m3 Kericak 0.820 0.00 m3

Pasir 0.490 0.00 m3

Semen 7.896 0.00 zag

Bendrat 2.077 0.00 kg

Paku 2.660 0.00 kg

Papan cor 4.442 0.00 lbr

Besi 11,3 23.126 0.00 btg

Besi 5,6 3.169 0.00 btg 2 Pondasi voet plat kecil m3 Kericak 0.820 0.00 m3

Pasir 0.490 0.00 m3

Semen 7.896 0.00 zag

Bendrat 2.077 0.00 kg

Paku 2.660 0.00 kg

Papan cor 4.442 0.00 lbr

Besi 9,5 13.581 0.00 btg

Besi 4,9 4.167 0.00 btg 3 Sloof praktis 15/20 1.940 m3 Kericak 0.820 1.59 m3

Pasir 0.490 0.95 m3

Semen 7.896 15.32 zag

Bendrat 2.077 4.03 kg

Paku 2.660 5.16 kg

Papan cor 11.108 21.55 lbr

Besi 9,5 11.112 21.56 btg

Besi 4,9 7.500 14.55 btg 4 Sloof struktur m3 Kericak 0.820 0.00 m3

Pasir 0.490 0.00 m3

Semen 7.896 0.00 zag

Bendrat 2.077 0.00 kg

Paku 2.660 0.00 kg

Papan cor 11.108 0.00 lbr

Besi 11,3 11.112 0.00 btg

Besi 5,6 7.112 0.00 btg 5 Kolom Struktur besar m3 Kericak 0.820 0.00 m3

Pasir 0.490 0.00 m3

Semen 7.896 0.00 zag

Bendrat 1.976 0.00 kg

Paku 2.660 0.00 kg

Papan cor 11.108 0.00 lbr

Besi 11,3 14.815 0.00 btg

Besi 5,6 7.831 0.00 btg 6 Kolom Struktur 15/20 m3 Kericak 0.820 0.00 m3

Pasir 0.490 0.00 m3

Semen 7.896 0.00 zag

Bendrat 1.976 0.00 kg

JENIS BAHAN & TNG KERJA

SATUAN BHN

JUMLAH BAHAN

Page 41: Master Rab Rumah Kecil

Hal 41/46URAIAN BAHAN BANGUNANPROYEK RUMAH TINGGAL TYPE 46/90 M2 (Bpk. REDY)

NO URAIAN PEKERJAAN VOLUME SATUAN SATUAN

I PEKERJAAN PONDASI

JENIS BAHAN & TNG KERJA

SATUAN BHN

JUMLAH BAHAN

Paku 3.556 0.00 kg

Papan cor 11.108 0.00 lbr

Besi 9,5 11.112 0.00 btg

Besi 4,9 7.500 0.00 btg 7 Tiang Praktis 15/15 2.160 m3 Kericak 0.820 1.77 m3

Pasir 0.490 1.06 m3

Semen 7.896 17.06 zag

Bendrat 1.976 4.27 kg

Paku 3.556 7.68 kg

Papan cor 14.809 31.99 lbr

Besi 8,3 14.815 32.00 btg

Besi 4,9 8.150 17.60 btg 8 Balok Struktur m3 Kericak 0.820 0.00 m3

Pasir 0.490 0.00 m3

Semen 7.896 0.00 zag

Bendrat 1.976 0.00 kg

Paku 3.556 0.00 kg

Usuk 4/6 11.111 0.00 btg

Papan cor 9.854 0.00 lbr

Besi 11,3 12.963 0.00 btg

Besi 5,6 7.831 0.00 btg 9 Ring balk 2.370 m3 Kericak 0.820 1.94 m3

Pasir 0.490 1.16 m3

Semen 7.896 18.71 zag

Bendrat 1.976 4.68 kg

Paku 3.556 8.43 kg

Usuk 4/6 8.333 19.75 btg

Papan cor 14.809 35.10 lbr

Besi 9,5 11.112 26.34 btg

Besi 4,9 7.500 17.78 btg 10 Balok Latey 0.400 m3 Kericak 0.820 0.33 m3

Pasir 0.490 0.20 m3

Semen 7.896 3.16 zag

Bendrat 1.976 0.79 kg

Paku 3.556 1.42 kg

Usuk 4/6 2.833 1.13 btg

Papan cor 14.809 5.92 lbr

Besi 8,3 14.815 5.93 btg

Besi 4,9 8.149 3.26 btg 11 Plat lantai beton t=12cm m3 Kericak 0.820 0.00 m3

Pasir 0.490 0.00 m3

Semen 7.896 0.00 zag

Bendrat 0.780 0.00 kg

Paku 2.000 0.00 kg

Usuk 4/6 8.333 0.00 btg

Papan cor 6.944 0.00 lbr

Besi 9,5 11.112 0.00 btg 12 Plat atap beton t=10cm m3 Kericak 0.820 0.00 m3

Pasir 0.490 0.00 m3

Semen 7.896 0.00 zag

Bendrat 0.780 0.00 kg

Paku 4.000 0.00 kg

Usuk 4/6 3.907 0.00 btg

Papan cor 8.330 0.00 lbr

Besi 8,3 11.112 0.00 btg

Page 42: Master Rab Rumah Kecil

Hal 42/46URAIAN BAHAN BANGUNANPROYEK RUMAH TINGGAL TYPE 46/90 M2 (Bpk. REDY)

NO URAIAN PEKERJAAN VOLUME SATUAN SATUAN

I PEKERJAAN PONDASI

JENIS BAHAN & TNG KERJA

SATUAN BHN

JUMLAH BAHAN

13 Plat tangga beton t=12cm m3 Kericak 0.820 0.00 m3

Pasir 0.490 0.00 m3

Semen 7.896 0.00 zag

Bendrat 0.780 0.00 kg

Paku 4.000 0.00 kg

Usuk 4/6 3.907 0.00 btg

Papan cor 6.940 0.00 lbr

Besi 9,5 13.283 0.00 btg 14 Leufel dan Plat Dapur t=8 0.570 m3 Kericak 0.820 0.47 m3

Pasir 0.490 0.28 m3

Semen 7.896 4.50 zag

Bendrat 0.780 0.44 kg

Paku 4.000 2.28 kg

Usuk 4/6 3.907 2.23 btg

Papan cor 8.330 4.75 lbr

Besi 8,3 10.940 6.24 btg 15 Beton Tumbuk m3 Kericak 0.910 0.00 m3

Pasir 0.540 0.00 m3

Semen 5.675 0.00 zag III PEKERJAAN DINDING DAN PLESTERAN

1 Pas. dinding bata ad 1:8 229.97 m2 Batu Bata 77.000 17,707.69 buah

Semen 0.270 62.09 zag

Pasir 0.045 10.35 m3 2 Plesteran Dinding bata ad 1:8 442.62 m2 Semen 0.195 86.31 zag

Pasir 0.027 11.86 m3

IV PEKERJAAN LANTAI1 Rabat Beton Tumbuk 1:3:5 t=5 2.50 m3 Grosok 0.000 0.00 m3

Semen 5.675 14.19 zag 2 Pas. keramik lantai 50/50 ruangan 1:8 m2 Keramik 50/50 4.000 0.00 lbr

Semen 0.203 0.00 zag

Pasir 0.032 0.00 m3 3 Pas. keramik lantai 40/40 ruangan 1:8 41.37 m2 Keramik 40/40 6.250 258.56 lbr

Semen 0.203 8.40 zag

Pasir 0.032 1.33 m3 4 Pas. keramik lantai 33,3/33,3 teras 1:8 5.85 m2 Keramik 33,3/33,3 9.183 53.72 doz

Semen 0.203 1.19 zag

Pasir 0.032 0.19 m3 5 Pas. lantai tangga,teras 30/30 1:8 m2 Keramik 30/30 11.111 0.00 lbr

Semen 0.203 0.00 zag

Pasir 0.032 0.00 m3 6 Pas. keramik lantai 25/25 KM/WC 2.62 m2 Keramik 25/25 16.000 41.92 lbr

Semen 0.203 0.53 zag

Pasir 0.032 0.08 m3 7 Pas. keramik dinding 25/33 KM/WC 10.40 m2 Keramik 25/33 12.121 126.06 doz

Semen 0.203 2.11 zag

Pasir 0.032 0.33 m3 8 Pas. Keramik lantai 20/20 KM/WC m2 Keramik 20/20 25.000 75.00 lbr

Semen 0.203 0.61 zag

Pasir 0.032 0.10 m3 9 Pas. Keramik dinding 20/25 KM/WC m2 Keramik 20/25 20.000 0.00 lbr

Semen 0.203 0.00 zag

Pasir 0.032 0.00 m3 10 Pas. Keramik dinding 20/20 dapur 3.00 m2 Keramik 20/20 25.000 75.00 lbr

Semen 0.203 0.61 zag

Page 43: Master Rab Rumah Kecil

Hal 43/46URAIAN BAHAN BANGUNANPROYEK RUMAH TINGGAL TYPE 46/90 M2 (Bpk. REDY)

NO URAIAN PEKERJAAN VOLUME SATUAN SATUAN

I PEKERJAAN PONDASI

JENIS BAHAN & TNG KERJA

SATUAN BHN

JUMLAH BAHAN

Pasir 0.032 0.10 m3 7 Pas. Lis 6/25 KM/WC 5.20 m1 Lis 6/25 4.000 20.80 bh

Semen 0.012 0.06 zag

Pasir 0.002 0.01 m3 7 Pas. Lis 6/20 KM/WC m1 Lis 6/20 5.000 0.00 bh

Semen 0.012 0.00 zag

Pasir 0.002 0.00 m3 11 Pas. Batu alam candi 20/20 m2 Batu alam 20/20 26.250 0.00 lembar

Semen 0.203 0.00 zag

Pasir 0.032 0.00 m3 12 Pas. Batu alam 20x60 m2 Batu alam 20/60 14.375 0.00 lembar

Semen 0.203 0.00 zag

Pasir 0.032 0.00 m3 13 Urugan Pasir Bawah Lantai t=3cm 1.50 m3 Pasir urug 1.200 1.80 m3

V PEKERJAAN ATAP1 Pek gording, nok, jurai m1 Kayu 6/12 x 4m 0.263 0.00 batang

Paku 0.190 0.00 kg 2 Pasang Usuk dan reng m2 Usuk 5/7 x 4m 0.550 0.00 btg

Reng 2/3 x 4m 0.825 0.00 btg

Paku 0.250 0.00 kg 3 Pekerjaan Papan Lisplank & Papan Angin 18.50 m1 Papan 2/20 x 2m 0.263 4.86 lembar

Paku 0.025 0.46 kg 4 Pekerjaan papan talang dan penutup m1 Papan 2/20 x 4m 0.550 0.00 lembar

Seng datar 1.050 0.00 m1 5 Pasang Kerpus genteng Beton 5.90 m1 Kerpus beton 3.675 21.68 buah

Semen 0.200 1.18 zag

Pasir 0.033 0.19 m3 6 Pasang Genteng Beton 64.00 m2 Genteng Beton 10.500 672.00 lembar 7 Gording kanal CNP15 44.60 m1 Kanal C 0.167 7.43 btg

VI PEKERJAAN PLAFOND DAN RANGKA1 Pekerjaan plafond gypsum ruangan 40.25 m2 Jayaboard 1,2x2,4 0.383 15.40 lembar

Rangka Hollow 0.802 32.28 batang

Skrup board 38.000 1,529.50 bh

Compound 0.025 0.99 zag 2 Pekerjaan plafond kalsiboard tritisan 12.77 m2 Kalsiboard 1,2x2,4 0.383 4.89 lembar

Rangka Hollow 0.802 10.24 batang

Skrup board 38.000 485.26 bh

Compound 0.025 0.32 zag VII PEKERJAAN PENGECATAN

1 Cat Tembok Eksterior abu2 mowilex 86.71 m2 Cat Tembok 0.167 14.45 kg

Alkali 0.083 7.22 kg 5 Cat Tembok Interior catylac 144.58 m2 Cat Tembok 0.375 54.22 kg 6 Cat Genteng 64.00 m2 Cat Genteng 0.125 8.00 kg 7 Water proofing m2 Water proofing 0.375 0.00 kg 8 Coating batu alam ex. Sicosol 5.42 m2 Coating batu 0.375 2.03 kg 9 Melamine daun pintu & roster m2 Melamine 0.284 0.00 kg

Thinner 0.200 0.00 kg 10 Cat Plafond 59.04 m2 Cat Tembok 0.250 14.76 kg 11 Cat kayu listplank 4.63 m2 Cat kayu 0.284 1.31 kg

Thinner 0.200 0.93 kg

Page 44: Master Rab Rumah Kecil

KEBUTUHAN BAHAN BANGUNAN

PROYEK RUMAH TINGGAL TYPE 46/90 M2 (Bpk. REDY)

NO URAIAN PEKERJAAN PAKU

I PEKERJAAN PONDASI

1 Pasang Bowplank 4.20 25.20 8.40

2 Urugan Pasir Bawah Pondasi 5.94

3 Pasangan Aanstamping - -

4 Pas Pondasi Batu belah 16.53 52.20 26.10

- 16.53 52.20 - 4.20 25.20 8.40 - - - - - 5.94 26.10

II PEKERJAAN BETON BERTULANG

1 Pondasi voet plat besar - - - - - - - -

2 Pondasi voet plat kecil - - - - - - - -

3 Sloof 15/20 1.59 0.95 15.32 4.03 5.16 21.55 21.56 14.55

4 Sloof 15/25 - - - - - - - -

5 Kolom struktur 15/25 - - - - - - - -

6 Kolom struktur 15/20 - - - - - - - -

7 Tiang Praktis 15/15 1.77 1.06 17.06 4.27 7.68 31.99 32.00 17.60

8 Balok beton 15/25 - - - - - - - - -

9 Ringbalk 15/20 1.94 1.16 18.71 4.68 8.43 19.75 35.10 26.34 17.78

10 Balok latey 15/15 0.33 0.20 3.16 0.79 1.42 1.13 5.92 5.93 3.26

11 Plat lantai beton t=12cm - - - - - - - -

12 Plat atap beton t=10cm - - - - - - - -

13 Plat tangga beton t=12cm - - - - - - - -

14 Leufel t=8 0.47 0.28 4.50 0.44 2.28 2.23 4.75 6.24

15 Beton tumbuk - -

6.10 3.65 58.75 14.22 24.97 23.11 99.31 - 47.89 44.16 - 53.19 - -

III PEKERJAAN DINDING DAN PLESTERAN

1 Pas. Dinding bata ad 1:8 10.35 62.09

2 Plesteran dinding ad 1:8 11.86 86.31

- 22.21 148.40 - - - - - - - - - - -

IV PEKERJAAN LANTAI

1 Floor Lantai Btn Tumbuk 1:3:5 14.19

2 Pas. keramik 50/50 - -

3 Pas. Keramik 40/40 1.33 8.40

4 Pas. keramik 33,3/33,3 0.19 1.19

5 Pas. keramik 30/30 - -

6 Pas. keramik 25/25 0.08 0.53

7 Pas. keramik 25/33 0.33 2.11

8 Pas. keramik 20/20 0.10 0.61

9 Pas. keramik 20/25 - -

10 Pas. Lis 6/25 KM/WC 0.01 0.06

11 Pas. Lis 6/20 KM/WC - -

12 Pas. keramik dapur 20/20 0.10 0.61

13 Pas. Batu candi 20/20 - -

14 Pas. Batu andesit 15/30 - -

15 Urugan Pasir Bawah Lantai 1.80

- 2.14 27.70 - - - - - - - - - 1.80 -

V PEKERJAAN ATAP

1 Pek gording, nok & jurai -

2 Pas. Usuk dan reng -

3 Pek. Ppn. Angin & Listplank 0.46

4 Pek. Talang dan Penutup

5 Pas. Kerpus genteng beton 0.19 1.18

6 Pas. Genteng Beton

7 Gording kanal CNP15

- 0.19 1.18 - 0.46 - - - - - - - - -

SATUAN m3 m3 zag kg kg btng lbr btg btg btg btg btg m3 m3

TOTAL BAHAN 6.1 44.7 288.2 14.2 29.6 48.3 107.7 - 47.9 44.2 - 53.2 7.7 26.1

KERICAK PASIR PASANG

SEMEN 40 KG

BENDRA

T

USUK 4/6

PAPAN COR

BESI 11,3

BESI 9,5 BESI 8,3 BESI 5,6 BESI 4,9 PASIR URUG

BATU BELAH

Page 45: Master Rab Rumah Kecil

Hal 45 / 46

REKAPITULASI KEBUTUHAN BAHANPROYEK RUMAH TINGGAL TYPE 46/90 M2 (Bpk. REDY)

NO. B A H A N / M A T E R I A L SAT JUMLAH HARGA SATUAN HARGA TOTAL

1 Semen PC 40 kg zak 288.23 Rp 42,000.00 Rp 12,105,521.40

2 Pasir Pasang 44.72 Rp 130,000.00 Rp 5,813,323.10

3 Pasir Urug 7.74 Rp 90,000.00 Rp 696,600.00

4 Batu Belah 26.10 Rp 100,000.00 Rp 2,610,000.00

5 Kericak 6.10 Rp 170,000.00 Rp 1,037,136.00

6 Bendrat kg 14.22 Rp 14,000.00 Rp 199,019.24

7 Paku kg 29.63 Rp 15,000.00 Rp 444,480.12

8 Usuk 4/6 (Cor) btg 48.31 Rp 5,000.00 Rp 241,547.60

9 Papan cor lbr 107.71 Rp 6,000.00 Rp 646,235.94

10 Besi Ø 12 (11,3) - 12 btg - Rp 86,080.80 Rp -

11 Besi Ø 10 (9,5) - 12 btg 47.89 Rp 59,966.40 Rp 2,871,954.00

12 Besi Ø 9 (8,3) - 12 btg 44.16 Rp 37,720.80 Rp 1,665,833.51

13 Besi Ø 6 (5,6) - 12 btg - Rp 22,994.40 Rp -

14 Besi Ø 5 (4,9) - 12 btg 53.19 Rp 15,678.00 Rp 833,890.87

15 Batu Bata bh 17,707.69 Rp 400.00 Rp 7,083,076.00

16 Genteng Beton FLAT lbr 672.00 Rp 3,500.00 Rp 2,352,000.00

17 Kerpus Genteng Beton bh 21.68 Rp 4,500.00 Rp 97,571.25

18 Canal C15 btg 7.43 Rp 175,500.00 Rp 1,304,550.00

19 Seng datar - Rp 25,000.00 Rp -

20 Papan GRC 2 m lbr 4.86 Rp 45,000.00 Rp 218,531.25

21 Papan kayu 2/20 lbr - Rp 110,000.00 Rp -

22 Kayu Balok 6/12 btg - Rp -

23 Kayu Usuk 5/7 btg - Rp -

24 Kayu Reng 2/3 btg - Rp -

25 Cat Exterior mowilex kg 14.45 Rp 63,000.00 Rp 910,637.09

29 Cat Alkali kg 7.22 Rp 34,000.00 Rp 245,580.06

30 Cat Interior catylac kg 54.22 Rp 15,000.00 Rp 813,262.50

31 Cat plafond maxilite kg 14.76 Rp 9,000.00 Rp 132,840.00

32 Cat Genteng kg 8.00 Rp 25,000.00 Rp 200,000.00

33 Sicosol kg 2.03 Rp 50,700.00 Rp 103,047.75

34 Water proofing kg - Rp 40,000.00 Rp -

35 Cat Kayu kg 1.31 Rp 35,000.00 Rp 45,972.50

36 Melamine kg - Rp 45,000.00 Rp -

37 Thinner kg 0.93 Rp 18,000.00 Rp 16,650.00

38 Scrup board bh 2,014.76 Rp 50.00 Rp 100,738.00

39 Compound zag 1.31 Rp 2,000.00 Rp 2,619.19

40 Gypsum Board lbr 15.40 Rp 45,000.00 Rp 693,165.38

41 Kalsiboard lbr 4.89 Rp 45,000.00 Rp 219,918.56

42 List Gypsum Ruangan m1 Rp 12,000.00 Rp -

43 Besi Hollow 2/4 btg 42.52 Rp 14,000.00 Rp 595,308.56

44 Batu alam - Rp -

45 Batu andesit 15/30 - Rp 120,000.00 Rp -

m3

m3

m3

m3

m1

m2

m2

Page 46: Master Rab Rumah Kecil

Hal 46 / 46

REKAPITULASI KEBUTUHAN BAHANPROYEK RUMAH TINGGAL TYPE 46/90 M2 (Bpk. REDY)

NO. B A H A N / M A T E R I A L SAT JUMLAH HARGA SATUAN HARGA TOTAL

46 Keramik 50/50 platinum dos - Rp -

47 Keramik 40/40 asia tile dos 43.09 Rp 32,500.00 Rp 1,400,546.88

48 Keramik 33,3/33,3 platinum dos 5.97 Rp 45,000.00 Rp 268,595.04

49 Keramik 30/30 asia tile dos - Rp 35,000.00 Rp -

50 Keramik Lantai 25/25 roman dos 2.62 Rp 46,000.00 Rp 120,520.00

51 Keramik Lantai 25/33,3 platinum dos 10.51 Rp 41,500.00 Rp 435,959.60

52 Keramik Lantai 20/20 wc asia tile dos 3.00 Rp 32,000.00 Rp 96,000.00

53 Keramik Dinding 20/25 asia tile dos - Rp 35,000.00 Rp -

54 Keramik Dapur 20/20 asia tile dos 3.00 Rp 32,000.00 Rp 96,000.00

55 List keramik 6/25 platinum bh 20.80 Rp 16,000.00 Rp 332,800.00

56 List Keramik 6/20 asia tile bh - Rp 6,000.00 Rp -

JUMLAH ###