PERBANDINGAN CAMPURAN BETON
Beton campuran 1 : 3 : 51 m³ Pc = 1 x 0.760 = 0.760 m³ spesi basah3 m³ Ps = 3 x 0.675 = 2.025 m³ spesi basah5 m³ Kr = 5 x 0.520 = 2.600 m³ spesi basah
5.385 m³ spesi basah1 m³ Beton membutuhkan :
Pc = 1/5.385 x 0.76 = 0.141 m³= 176.415970287837 Kg = 4.4103993 sak ~ 5 sak
Ps = 0.376 m³Kr = 0.483 m³
Beton campuran 1 : 2 : 31 m³ Pc = 1 x 0.760 = 0.760 m³ spesi basah2 m³ Ps = 2 x 0.675 = 1.350 m³ spesi basah3 m³ Kr = 3 x 0.520 = 1.560 m³ spesi basah
3.670 m³ spesi basah1 m³ Beton membutuhkan :
Pc = 1/3.67 x 0.76 = 0.207 m³= 258.855585831063 Kg = 6.4713896 sak ~ 7 sak
Ps = 0.368 m³Kr = 0.425 m³
Hal 2/46
ANALISA BETON BERTULANG
Tabel Berat Besi
mm kg/m
Ø 5 0.15 8000 14400 4.9
Ø 6 0.22 8000 21120
Ø 8 0.39 8000 37440 8.3
Ø 10 0.62 8000 59520 9.5
Ø 12 0.89 8000 85440
Ø 14 1.21 8000 116160
Ø 16 1.58 8000 151680
Sloof 15/20 Begel 10/15 jarak 20cm
per m1 sat per m3 sat jmlh batang / m3
Volume 0.03 m3
Bekisting 0.4 m2 13.3333 m2
Perancah m2 0.0000 m2
d (mm) p (m)
Besi Ø 10 1 4 4 2.48 11.1111111111111
Ø 5 0.54 5 2.7 0.405 2.885 kg 96.1667 kg 7.5 166.666667
Sloof 15/25 Begel 10/20 jarak 20cm
per m1 sat per m3 sat jmlh batang / m3
Volume 0.0375 m3
Bekisting 0.5 m2 13.3333 m2
Perancah m2 0.0000 m2
d (mm) p (m)
Besi Ø 12 1 5 5 4.45 11.1111111111111
Ø 6 0.64 5 3.2 0.704 5.154 kg 137.4400 kg 7.11111111111111
Ringbalk 15/20 Begel 10/15 jarak 20cm
per m1 sat per m3 sat jmlh batang / m3
Volume 0.03 m3
Bekisting 0.6 m2 20.0000 m2
Perancah 3 m2 100.0000 m2
d (mm) p (m)
Besi Ø 10 1 4 4 2.48 11.1111111111111
Ø 5 0.54 5 2.7 0.405 2.885 kg 96.1667 kg 7.5
Ringbalk, Latey 15/15 Begel 10/10 jarak 20cm
per m1 sat per m3 sat jmlh batang / m3
Volume 0.0225 m3
Bekisting 0.4 m2 17.7778 m2
Perancah 2 btg 88.8889 btg
d (mm) p (m)
Besi Ø 8 1 4 4 1.56 14.8148148148148
Ø 5 0.44 5 2.2 0.33 1.89 kg 84.0000 kg 8.14814814814815
Kolom Praktis 15/15 Begel 10/10 jarak 20cm
per m1 sat per m3 sat jmlh batang / m3
Volume 0.0225 m3
Bekisting 0.4 m2 17.7778 m2
Perancah btg btg
d (mm) p (m)
Besi Ø 8 1 4 4 1.56 14.8148148148148
Ø 5 0.44 5 2.2 0.33 1.89 kg 84.0000 kg 8.14814814814815 222.222222
Balok 15/25 Begel 10/20 jarak 20cm
per m1 sat per m3 sat jmlh batang / m3
Volume 0.0375 m3
Bekisting 0.41 m2 10.9333 m2
Perancah 3 btg 80.0000 btg
d (mm) p (m)
Besi Ø 12 1 5 5 4.45 11.1111111111111
Ø 6 0.64 5 3.2 0.704 5.154 kg 137.4400 kg 7.11111111111111
Hal 3/46
Balok 15/30 Begel 10/25 jarak 15 - 20cm (17,5cm)
per m1 sat per m3 sat jmlh batang / m3
Volume 0.045 m3
Bekisting 0.51 m2 11.3333 m2
Perancah 3 btg 66.6667 btg
d (mm) p (m)
Besi Ø 12 1 7 7 6.23 12.962962962963
Ø 6 0.74 5.714 4.2284 0.9302 7.1602392 kg 159.1164 kg 7.8302962962963
Balok 20/60 Begel 10/25 jarak 10 - 20cm (15cm)
per m1 sat per m3 sat jmlh batang / m3
Volume 0.12 m3
Bekisting 0.51 m2 11.3333 m2
Perancah 3 btg 66.6667 btg
d (mm) p (m)
Besi Ø 12 1 7 7 6.23 12.962962962963
Ø 6 0.74 5.714 4.2284 0.9302 7.1602392 kg 159.1164 kg 7.8302962962963
Kolom 15/20 Begel 10/15 jarak 20cm
per m1 sat per m3 sat jmlh batang / m3
Volume 0.03 m3
Bekisting 0.4 m2 13.3333 m2
Perancah 0.67 btg 22.3333 btg
d (mm) p (m)
Besi Ø 10 1 4 4 2.48 11.1111111111111
Ø 5 0.54 5 2.7 0.405 2.885 kg 96.1667 kg 7.5
Kolom 15/30 Begel 10/25 jarak 15 - 20cm (17,5cm)
per m1 sat per m3 sat jmlh batang / m3
Volume 0.045 m3
Bekisting 0.51 m2 11.3333 m2
Perancah 1 btg 22.2222 btg
d (mm) p (m)
Besi Ø 12 1 8 8 7.12 14.8148148148148
Ø 6 0.74 5.714 4.2284 0.9302 8.0502392 kg 178.8942 kg 7.8302962962963
Kolom 30/30 Begel 10/25 jarak 15 - 20cm (17,5cm)
per m1 sat per m3 sat jmlh batang / m3
Volume 0.09 m3
Bekisting 0.7 m2 7.7778 m2
Perancah 1 btg 11.1111 btg
d (mm) p (m)
Besi Ø 16 1 4 4 6.32 3.7037037037037
Ø 12 1 4 4 3.56 3.7037037037037
Ø 10 1.09 5.714 6.2283 3.8615 13.7415212 kg 152.6836 kg 5.76690740740741
Kolom 25/25 Begel 10/25 jarak 15 - 20cm (17,5cm)
per m1 sat per m3 sat jmlh batang / m3
Volume 0.0625 m3
Bekisting 0.6 m2 9.6000 m2
Perancah 1 btg 16.0000 btg
d (mm) p (m)
Besi Ø 16 4 0 0 0
Ø 12 1 8 8 7.12 10.6666666666667
Ø 8 0.9 5.714 5.1426 3.1884 10.308412 kg 164.9346 kg 6.8568
Plat lantai t = 12cm Jarak 25 x 25 cm (2 lapis)
per m2 sat per m3 sat jmlh batang / m3
Volume 0.12 m3
Bekisting 1 m2 8.3333 m2
Perancah 1 m2 8.3333 m2
d (mm) p (m)
Besi 0
Hal 4/46
Ø 10 1 16 16 9.92 9.92 kg 82.6667 kg 11.1111111111111
Atap t = 8cm Jarak 20 x 20 cm (1 lapis)
per m2 sat per m3 sat
Volume 0.08 m3
Bekisting 1 m2 12.5000 m2
Perancah 1 m2 12.5000 m2
d (mm) p (m)
Besi
Ø 8 1 10 10 3.9 3.9 kg 48.7500 kg
Atap t = 10cm Jarak 30 x 30 cm (2 lapis)
per m2 sat per m3 sat jmlh batang / m3
Volume 0.1 m3
Bekisting 1 m2 10.0000 m2
Perancah 1 m2 10.0000 m2
d (mm) p (m)
Besi 0
Ø 8 1 13.334 13.334 5.2003 5.20026 kg 52.0026 kg 11.1116666666667
Voet plat 80x80 Begel 10/25 jarak 15cm
per unit sat per m3 sat jmlh batang / m3
Volume 0.11675 m3
Bekisting 0.48 m2 4.1113 m2
Perancah
d (mm) p (m)
Besi Ø 12 32.4 1 32.4 28.836 23.1263383297645
Ø 6 0.74 6 4.44 0.9768 29.8128 kg 255.3559 kg 3.16916488222698
Voet plat 60x60 Begel 10/15 jarak 15cm
per unit sat per m3 sat jmlh batang / m3
Volume 0.054 m3
Bekisting 0.48 m2 4.1113 m2
Perancah
d (mm) p (m)
Besi Ø 10 8.8 1 8.8 5.456 13.5802469135802
Ø 5 0.54 5 2.7 0.405 5.861 kg 108.5370 kg 4.16666666666667 92.59259
Voet plat 100x100 Begel 30/30 jarak 15cm
per unit sat per m3 sat jmlh batang / m3
Volume 0.281 m3
Bekisting 0.48 m2 4.1113 m2
Perancah
d (mm) p (m)
Besi Ø 12 32.4 1 32.4 28.836 23.1263383297645
Ø 6 0.74 6 4.44 0.9768 29.8128 kg 255.3559 kg 3.16916488222698
balok 20/93 Begel 10/25 jarak 15 - 20cm (17,5cm)
per m1 sat per m3 sat jmlh batang / m3
Volume 0.186 m3
Bekisting 0.6 m2 3.2258 m2
Perancah 1 btg 5.3763 btg
d (mm) p (m)
Besi Ø 16 1 3 3 4.74 5.55555555555556
Ø 12 1 10 10 8.9 4.48028673835125
Ø 8 2.15 5.714 12.285 4.7912 18.431189 kg 99.0924 kg 5.5040770609319
balok 20/60 Begel 10/25 jarak 15 - 20cm (17,5cm)
per m1 sat per m3 sat jmlh batang / m3
Volume 0.12 m3
Bekisting 0.6 m2 5.0000 m2
Perancah 1 btg 8.3333 btg
d (mm) p (m)
Besi Ø 16 1 3 3 4.74 5.55555555555556
Hal 5/46
Ø 12 1 6 6 5.34 4.16666666666667
Ø 8 1.5 5.714 8.571 3.3427 13.42269 kg 111.8558 kg 5.95208333333333
Kolom 25/25 Begel 10/25 jarak 15 - 20cm (17,5cm)
per m1 sat per m3 sat jmlh batang / m3
Volume 0.0625 m3
Bekisting 0.6 m2 9.6000 m2
Perancah 1 btg 16.0000 btg
d (mm) p (m)
Besi Ø 16 4 0 0 0
Ø 12 1 8 8 7.12 10.6666666666667
Ø 8 0.9 5.714 5.1426 3.1884 10.308412 kg 164.9346 kg 6.8568
Hal 6/46
DAFTAR HARGA SATUAN UPAH DAN BAHANKOTA SEMARANG
Tahun 2011
SATUAN HARGA KET.
NO. U R A I A N SATUAN
(RUPIAH)
A U P A H :
1 Tukang Batu hari 43,000
2 Tukang Besi hari 43,000
3 Tukang Kayu hari 43,000
4 Kepala Tukang hari 47,000
5 Pekerja hari 33,000
6 Mandor hari 45,000
B B A H A N / M A T E R I A L :
1 Amplas Tembok lbr. 600
2 Amplas Sikkens lbr. 2,500
3 Adukan ready mix K-225 m3 560,000
4 Alat bantu selang lot 80,000
5 Batu Bata Welahan bh. 400
6 Batu Belah m3 100,000
7 Besi Beton kg. 7,500
8 Bubungan Genteng beton flat bh. 3,800
9 Cat Dasar kg. 20,000
10 Cat Kilat kg. 60,000
11 Cat Meni Nippon kg. 15,000
12 Cat Dulux Ext ltr. 70,000
13 Cat Tembok samping flinkote kg. 26,000
14 Cat Tembok exterior mowilex ltr. 55,000
15 Cat Tembok interior ex catylac kg. 18,000
16 Cat plafond maxilite kg. 8,800
17 Cat Alkali kg. 23,750
18 Folding Gate m2 285,000
19 Genteng beton flat bh. 3,500
20 Gypsum 9 mm lbr 46,000
21 Kalsiboard ex. Nusaboard 4,5 mm lbr 45,000
22 Kaca Bening 5 mm m2 60,000
23 Kaca Warna 10 mm m2 250,000
24 Kawat Pengikat kg. 14,000
25 Kayu Dolken btg 12,000
26 Kayu Bengkirai Papan m3 6,000,000
27 Kayu Bengkirai 6/12 x 4m btg 200,000
28 Besi Hollow btng 18,000
29 Kayu Usuk untuk Cor m3 2,500,000
30 Koral Beton m3 170,000
31 Lembar Seng m1 25,000
32 List Gypsum m1 12,000
33 Minyak Cat ltr. 5,500
34 Multiplex 9mm lbr 105,000
35 Paku bermacam-macam ukuran kg 15,000
36 Paku Beton bh. 500
37 Paku Biasa kg. 15,000
38 Paku Gypsum kg 30,000
39 Papan Cor lbr 7,000
40 Pasir Muntilan m3 130,000
41 Pasir Urug m3 90,000
42 Plamir Kayu kg. 11,000
Hal 7/46
DAFTAR HARGA SATUAN UPAH DAN BAHANKOTA SEMARANG
Tahun 2011
SATUAN HARGA KET.
NO. U R A I A N SATUAN
(RUPIAH)
43 Plamir Tembok kg. 8,000
44 S p l i t m3 170,000
45 Semen Portland (PC) zak 42,000
46 Semen Putih zak 55,000
47 Tanah Urug m3 50,000
48 Ter / Residu ltr. 9,000
49 Thinner ltr. 6,500
50 Alat Bantu / Steiger Ls 18,000
51 Kayu Usuk 5/7 x 4m Bengkirai btg 85,000
52 Kayu Reng 2/3 4 m Bengkirai btg 13,000
53 Papan 2/30 x 4 m lbr 110,000
54 Wood plank 2/20 x 4 m ex. Elephant lbr 45,000
55 Keramik 40 x 40 cm ex platinum dos 50,000
56 Keramik 33 x 33 cm platinum dos 45,000
57 Keramik 30 x 30 cm ex asia tile dos 35,000
58 Keramik 30 x 30 cm ex platinum dos 35,000
59 Keramik 20 x 20 cm ex asia tile dos 32,000
60 Keramik 25 x 33 cm platinum dos 41,500
61 Keramik 20 x 25 cm ex asia tile dos 35,000
62 List 25cm platinum bh. 16,000
63 List 20cm asia tile bh. 6,000
Hal 8/46
DAFTAR ANALISA PEKERJAAN
PEMBANGUNAN RUMAH TINGGALKOTA SEMARANG 2011
I. PEKERJAAN PERSIAPAN
0.1000 Pekerja @Rp. 33,000.00 Rp. 3,300.00 5,550.00
0.0500 Mandor @Rp. 45,000.00 Rp. 2,250.00
Rp. 5,550.00
2. Analisa 10 M' Pasangan Bouwplank0.0030 Kayu Cor @Rp. 2,500,000.00 Rp. 7,500.00
6.0000 Btg Kayu Gelam @Rp. 12,000.00 Rp. 72,000.00
0.1000 Kg Paku Biasa @Rp. 15,000.00 Rp. 1,500.00
1.0000 Tukang @Rp. 43,000.00 Rp. 43,000.00 82,950.00
0.1000 Kepala Tukang @Rp. 47,000.00 Rp. 4,700.00
1.0000 Pekerja @Rp. 33,000.00 Rp. 33,000.00
0.0500 Mandor @Rp. 45,000.00 Rp. 2,250.00
163,950.00
Untuk 1 M' = 1/10 Rp. 16,395.00
II. PEKERJAAN PONDASI.
0.7500 Pekerja @Rp. 33,000.00 Rp. 24,750.00 25,875.00
0.0250 Mandor @Rp. 45,000.00 Rp. 1,125.00
Rp. 25,875.00
0.2500 Pekerja @Rp. 33,000.00 Rp. 8,250.00 8,628.00
0.0084 Mandor @Rp. 45,000.00 Rp. 378.00
Rp. 8,628.00
1.2000 m3 Pasir Urug @Rp. 90,000.00 Rp. 108,000.00
0.3000 Pekerja @Rp. 33,000.00 Rp. 9,900.00 10,350.00
0.0100 Mandor @Rp. 45,000.00 Rp. 450.00
Rp. 118,350.00
1.1000 Batu Kali @Rp. 100,000.00 Rp. 110,000.00
0.5000 Pasir Urug @Rp. 90,000.00 Rp. 45,000.00
1.5000 Pekerja @Rp. 33,000.00 Rp. 49,500.00 52,875.00
0.0750 Mandor @Rp. 45,000.00 Rp. 3,375.00
Rp. 207,875.00
1.2000 Batu Kali @Rp. 100,000.00 Rp. 120,000.00
2.4000 Zak Semen Portland (PC) @Rp. 42,000.00 Rp. 100,800.00
0.7600 Pasir Pasang @Rp. 130,000.00 Rp. 98,800.00
0.6000 Tukang @Rp. 43,000.00 Rp. 25,800.00 81,495.00
0.0600 Kepala Tukang @Rp. 47,000.00 Rp. 2,820.00
1.5000 Pekerja @Rp. 33,000.00 Rp. 49,500.00
0.0750 Mandor @Rp. 45,000.00 Rp. 3,375.00
Rp. 401,095.00
1.2000 Tanah Urug @Rp. 50,000.00 Rp. 60,000.00
0.3000 Pekerja @Rp. 33,000.00 Rp. 9,900.00 10,350.00
0.0100 Mandor @Rp. 45,000.00 Rp. 450.00
1. Analisa 1 m2 Pembersihan Lapangan
M3
1. Analisa 1 M3 Galian Tanah Pondasi
2. Analisa 1 M3 Urugan Tanah Kembali
3. Analisa 1 M3 Urugan Pasir Bawah Pondasi
4. Analisa 1 M3 Aanstamping Batu KaliM3
M3
5. Analisa 1 M3 Pasangan Pondasi Batu Kali ad. 1 : 8M3
M3
6. Analisa 1 M3 Urugan Tanah UrugM3
Hal 9/46
Rp. 70,350.00
III. PEK. BETON BERTULANG Ad. 1:2:3
7.8960 Zak Semen Portland (PC) @Rp. 42,000.00 Rp. 331,632.00
0.4900 Pasir Pasang @Rp. 130,000.00 Rp. 63,700.00
0.8200 Koral Beton @Rp. 170,000.00 Rp. 139,400.00
0.2500 Tukang @Rp. 43,000.00 Rp. 10,750.00 69,975.00
0.0250 Kepala Tukang @Rp. 47,000.00 Rp. 1,175.00
1.6500 Pekerja @Rp. 33,000.00 Rp. 54,450.00
0.0800 Mandor @Rp. 45,000.00 Rp. 3,600.00
Rp. 604,707.00
1.0000 Adukan ready mix K-225 @Rp. 560,000.00 Rp. 560,000.00
0.0450 Alat bantu selang @Rp. 80,000.00 Rp. 3,600.00
1.0000 Upah Tenaga @Rp. 34,987.50 Rp. 34,987.50
Rp. 598,587.50
5.6750 Zak Semen Portland (PC) @Rp. 42,000.00 Rp. 238,350.00
0.5400 Pasir Pasang @Rp. 130,000.00 Rp. 70,200.00
0.9100 Koral Beton @Rp. 170,000.00 Rp. 154,700.00
1.0000 Upah Tenaga @Rp. 69,975.00 Rp. 69,975.00
Rp. 533,225.00
d. Analisa Tulang Besi 1 Kg Besi Beton Terpasang
1.0500 Kg Besi Beton @Rp. 7,500.00 Rp. 7,875.00
0.0150 Kg Kawat Pengikat @Rp. 14,000.00 Rp. 210.00
0.0070 Tukang @Rp. 43,000.00 Rp. 301.00 582.90
0.0007 Kepala Tukang @Rp. 47,000.00 Rp. 32.90
0.0070 Pekerja @Rp. 33,000.00 Rp. 231.00
0.0004 Mandor @Rp. 45,000.00 Rp. 18.00
Rp. 8,667.90
e. Analisa Upah Bekisting (dengan papan cor l=20cm p=200cm) / M2 (3x pakai)
0.8333 lbr Papan cor @Rp. 7,000.00 Rp. 5,833.33
0.2000 Kg Paku Biasa @Rp. 15,000.00 Rp. 3,000.00
0.2600 Tukang @Rp. 43,000.00 Rp. 11,180.00 30,732.00
0.0260 Kepala Tukang @Rp. 47,000.00 Rp. 1,222.00
0.5200 Pekerja @Rp. 33,000.00 Rp. 17,160.00
0.0260 Mandor @Rp. 45,000.00 Rp. 1,170.00
Rp. 39,565.33
f. Analisa Pembuatan Tiang Perancah /M2 (4x pakai)
1.5625 btg Kayu Dolken @Rp. 12,000.00 Rp. 18,750.00
0.2000 Kg Paku @Rp. 15,000.00 Rp. 3,000.00
0.3300 Tukang @Rp. 43,000.00 Rp. 14,190.00 38,730.00
0.0300 Kepala Tukang @Rp. 47,000.00 Rp. 1,410.00
0.6600 Pekerja @Rp. 33,000.00 Rp. 21,780.00
0.0300 Mandor @Rp. 45,000.00 Rp. 1,350.00
Rp. 60,480.00
1. Analisa Beton Bertulang Pondasi Foot Plat ad. 1:2:3 Kecil1.0000 Beton cor ready mix K-225 @Rp. 598,587.50 Rp. 598,587.50
5.3333 M2 Bekisting @Rp. 39,565.33 Rp. 211,013.79
132.9211 Kg Besi Beton Tulangan @Rp. 8,667.90 Rp. 1,152,146.80
Rp. 1,961,748.09
2. Analisa Beton Bertulang Sloof Struktur ad. 1:2:31.0000 Beton cor ready mix K-225 @Rp. 598,587.50 Rp. 598,587.50
13.3300 M2 Bekisting @Rp. 39,565.33 Rp. 527,405.89
171.0900 Kg Besi Beton Tulangan @Rp. 8,667.90 Rp. 1,482,991.01
a. Analisa 1 M3 Beton ad. 1 : 2 : 3 (site mix K-225)
M3
M3
b. Analisa 1 M3 Beton ad. 1 : 2 : 3 (ready mix K-225 berikut selang)
M3
c. Analisa 1 M3 Beton ad. 1 : 3 : 5 (untuk konstruksi rabat, lantai kerja)
M3
M3
M3
M3
Hal 10/46
Rp. 2,608,984.40
3. Analisa Beton Bertulang Sloof Praktis 15/20 ad. 1:2:31.0000 Beton cor ready mix K-225 @Rp. 598,587.50 Rp. 598,587.50
13.3333 M2 Bekisting @Rp. 39,565.33 Rp. 527,536.46
138.4667 Kg Besi Beton Tulangan @Rp. 8,667.90 Rp. 1,200,215.51
Rp. 2,326,339.47
4. Analisa Beton Bertulang Kolom Struktur (15/20) ad. 1:2:31.0000 Beton cor site mix K-225 @Rp. 604,707.00 Rp. 604,707.00
13.3333 M2 Bekisting @Rp. 39,565.33 Rp. 527,536.46
5.5833 btg Tiang Perancah @Rp. 7,500.00 Rp. 41,874.94
138.4667 Kg Besi Beton Tulangan @Rp. 8,667.90 Rp. 1,200,215.51
Rp. 2,374,333.91
5. Analisa Beton Bertulang Kolom Praktis 15/15 ad. 1:2:31.0000 Beton cor site mix K-225 @Rp. 604,707.00 Rp. 604,707.00
17.7778 M2 Bekisting @Rp. 39,565.33 Rp. 703,384.58
131.7333 Kg Besi Beton Tulangan @Rp. 8,667.90 Rp. 1,141,851.33
Rp. 2,449,942.91
6. Analisa Beton Bertulang Balok 15/40 ad. 1:2:31.0000 Beton cor ready mix K-225 @Rp. 598,587.50 Rp. 598,587.50
11.8300 M2 Bekisting @Rp. 39,565.33 Rp. 468,057.89
1.6670 M2 Tiang Perancah @Rp. 60,480.00 Rp. 100,820.16
213.8300 Kg Besi Beton Tulangan @Rp. 8,667.90 Rp. 1,853,457.06
Rp. 3,020,922.61
7. Analisa Beton Bertulang Balok 15/20 ad. 1:2:31.0000 Beton cor site mix K-225 @Rp. 604,707.00 Rp. 604,707.00
13.3333 M2 Bekisting @Rp. 39,565.33 Rp. 527,536.46
1.6670 M2 Tiang Perancah @Rp. 60,480.00 Rp. 100,820.16
138.4667 Kg Besi Beton Tulangan @Rp. 8,667.90 Rp. 1,200,215.51
Rp. 2,433,279.13
7. Analisa Beton Bertulang Ring Balk 15/15 ad. 1:2:31.0000 Beton cor site mix K-225 @Rp. 604,707.00 Rp. 604,707.00
17.7778 M2 Bekisting @Rp. 39,565.33 Rp. 703,384.58
1.6670 M2 Tiang Perancah @Rp. 60,480.00 Rp. 100,820.16
131.7333 Kg Besi Beton Tulangan @Rp. 8,667.90 Rp. 1,141,851.33
Rp. 2,550,763.07
8. Analisa Beton Bertulang Balok Latey 15/15 ad. 1:2:31.0000 Beton cor site mix K-225 @Rp. 604,707.00 Rp. 604,707.00
17.7778 M2 Bekisting @Rp. 39,565.33 Rp. 703,384.58
84.0000 Kg Besi Beton Tulangan @Rp. 8,667.90 Rp. 728,103.60
Rp. 2,036,195.18
9. Analisa Beton Bertulang Plat Lantai ad. 1:2:3 t = 12cm1.0000 Beton cor ready mix K-225 @Rp. 598,587.50 Rp. 598,587.50
8.3330 M2 Bekisting @Rp. 70,482.00 Rp. 587,326.51 multiplek
6.0000 M2 Tiang Perancah @Rp. 60,480.00 Rp. 362,880.00
78.4580 Kg Besi Beton Tulangan @Rp. 8,667.90 Rp. 680,066.10
Rp. 2,228,860.10
10. Analisa Beton Bertulang Plat Atap ad. 1:2:3 t = 10cm1.0000 Beton cor ready mix K-225 @Rp. 598,587.50 Rp. 598,587.50
10.0000 M2 Bekisting @Rp. 70,482.00 Rp. 704,820.00
10.0000 M2 Tiang Perancah @Rp. 60,480.00 Rp. 604,800.00
52.0026 Kg Besi Beton Tulangan @Rp. 8,667.90 Rp. 450,753.34
Rp. 2,358,960.84
M3
M3
M3
M3
M3
M3
M3
M3
M3
Hal 11/46
11. Analisa Beton Bertulang Tangga ad. 1:2:3 t = 12cm1.0000 Beton cor ready mix K-225 @Rp. 598,587.50 Rp. 598,587.50
8.3350 M2 Bekisting @Rp. 70,482.00 Rp. 587,467.47
8.3520 M2 Tiang Perancah @Rp. 60,480.00 Rp. 505,128.96
171.0000 Kg Besi Beton Tulangan @Rp. 8,667.90 Rp. 1,482,210.90
Rp. 3,173,394.83
12. Analisa Beton Bertulang Dapur ad. 1:2:3 t = 8cm1.0000 Beton cor ready mix K-225 @Rp. 598,587.50 Rp. 598,587.50
12.5000 M2 Bekisting @Rp. 33,732.00 Rp. 421,650.00 multiplek
12.5000 M2 Tiang Perancah @Rp. 60,480.00 Rp. 756,000.00
48.7500 Kg Besi Beton Tulangan @Rp. 8,667.90 Rp. 422,560.13
Rp. 2,198,797.63
IV. PEKERJAAN DINDING DAN PLESTERAN
80.0000 Bh Batu Bata Merah @Rp. 400.00 Rp. 32,000.00
0.3962 Zak Semen Portland (PC) @Rp. 42,000.00 Rp. 16,640.40
0.0420 Pasir Pasang @Rp. 130,000.00 Rp. 5,460.00
0.1000 Tukang @Rp. 43,000.00 Rp. 4,300.00 15,345.00
0.0100 Kepala Tukang @Rp. 47,000.00 Rp. 470.00
0.3000 Pekerja @Rp. 33,000.00 Rp. 9,900.00
0.0150 Mandor @Rp. 45,000.00 Rp. 675.00
Rp. 69,445.40
80.0000 Bh Batu Bata Merah @Rp. 400.00 Rp. 32,000.00
0.2700 Zak Semen Portland (PC) @Rp. 42,000.00 Rp. 11,340.00
0.0450 Pasir Pasang @Rp. 130,000.00 Rp. 5,850.00
0.1000 Tukang @Rp. 43,000.00 Rp. 4,300.00 15,345.00
0.0100 Kepala Tukang @Rp. 47,000.00 Rp. 470.00
0.3000 Pekerja @Rp. 33,000.00 Rp. 9,900.00
0.0150 Mandor @Rp. 45,000.00 Rp. 675.00
Rp. 64,535.00
0.3300 Zak Semen Portland (PC) @Rp. 42,000.00 Rp. 13,860.00
0.0250 Pasir Pasang @Rp. 130,000.00 Rp. 3,250.00
0.1800 Tukang @Rp. 43,000.00 Rp. 7,740.00 21,276.00
0.0180 Kepala Tukang @Rp. 47,000.00 Rp. 846.00
0.3600 Pekerja @Rp. 33,000.00 Rp. 11,880.00
0.0180 Mandor @Rp. 45,000.00 Rp. 810.00
Rp. 38,386.00
0.1950 Zak Semen Portland (PC) @Rp. 42,000.00 Rp. 8,190.00
0.0268 Pasir Pasang @Rp. 130,000.00 Rp. 3,484.00
0.1800 Tukang @Rp. 43,000.00 Rp. 7,740.00 21,276.00
0.0180 Kepala Tukang @Rp. 47,000.00 Rp. 846.00
0.3600 Pekerja @Rp. 33,000.00 Rp. 11,880.00
0.0180 Mandor @Rp. 45,000.00 Rp. 810.00
Rp. 32,950.00
V. PEKERJAAN LANTAI
1.2000 Pasir Urug @Rp. 90,000.00 Rp. 108,000.00
0.3000 Pekerja @Rp. 33,000.00 Rp. 9,900.00 10,350.00
0.0100 Mandor @Rp. 45,000.00 Rp. 450.00
M3
M3
1. Analisa 1 M2 Pasangan Dinding Batu Bata ad. 1 : 4
M3
2. Analisa 1 M2 Pasangan Dinding Batu Bata ad. 1 : 8
M3
3. Analisa 1 M2 Plesteran ad. 1 : 4
M3
4. Analisa 1 M2 Plesteran ad. 1 : 8 tebal 2 cm
M3
1. Analisa 1 M3 Urugan Pasir Bawah LantaiM3
Hal 12/46
Rp. 118,350.00
4.0000 Zak Semen Portland (PC) @Rp. 42,000.00 Rp. 168,000.00
0.5000 Pasir Pasang @Rp. 130,000.00 Rp. 65,000.00
1.0000 Koral Beton @Rp. 170,000.00 Rp. 170,000.00
0.2000 Tukang @Rp. 43,000.00 Rp. 8,600.00 49,410.00
0.0200 Kepala Tukang @Rp. 47,000.00 Rp. 940.00
1.2000 Pekerja @Rp. 33,000.00 Rp. 39,600.00
0.0060 Mandor @Rp. 45,000.00 Rp. 270.00
Rp. 452,410.00
6.5625 Bh Keramik 40 x 40 @Rp. 8,333.33 Rp. 54,687.50 6.25
0.2030 Zak Semen Portland (PC) @Rp. 42,000.00 Rp. 8,526.00
Zak Semen Putih @Rp. 55,000.00 Rp. -
0.0321 Pasir Pasang @Rp. 130,000.00 Rp. 4,173.00
0.1200 Tukang @Rp. 43,000.00 Rp. 5,160.00 14,559.00
0.0120 Kepala Tukang @Rp. 47,000.00 Rp. 564.00
0.2500 Pekerja @Rp. 33,000.00 Rp. 8,250.00
0.0130 Mandor @Rp. 45,000.00 Rp. 585.00
Rp. 81,945.50
9.6419 Bh Keramik 33 x 33 @Rp. 5,000.00 Rp. 48,209.37 9.182736455464
0.2030 Zak Semen Portland (PC) @Rp. 42,000.00 Rp. 8,526.00
Zak Semen Putih @Rp. 55,000.00 Rp. -
0.0321 Pasir Pasang @Rp. 130,000.00 Rp. 4,173.00
1.0000 Upah Tenaga @Rp. 14,559.00 Rp. 14,559.00
Rp. 75,467.37
11.6667 Bh Keramik 30 x 30 @Rp. 3,181.82 Rp. 37,121.21 11.11111111111
0.2030 Zak Semen Portland (PC) @Rp. 42,000.00 Rp. 8,526.00
Zak Semen Putih @Rp. 55,000.00 Rp. -
0.0321 Pasir Pasang @Rp. 130,000.00 Rp. 4,173.00
1.0000 Upah Tenaga @Rp. 14,559.00 Rp. 14,559.00
Rp. 64,379.21
11.6667 Bh Keramik 30 x 30 @Rp. 3,181.82 Rp. 37,121.21 16
0.2030 Zak Semen Portland (PC) @Rp. 42,000.00 Rp. 8,526.00
Zak Semen Putih @Rp. 55,000.00 Rp. -
0.0321 Pasir Pasang @Rp. 130,000.00 Rp. 4,173.00
1.0000 Upah Tenaga @Rp. 14,559.00 Rp. 14,559.00
Rp. 64,379.21
26.2500 Bh Keramik 20 x 20 @Rp. 1,280.00 Rp. 33,600.00 25
0.2030 Zak Semen Portland (PC) @Rp. 42,000.00 Rp. 8,526.00
Zak Semen Putih @Rp. 55,000.00 Rp. -
0.0321 Pasir Pasang @Rp. 130,000.00 Rp. 4,173.00
1.0000 Upah Tenaga @Rp. 14,559.00 Rp. 14,559.00
Rp. 60,858.00
12.7273 Bh Keramik 25 x 33 @Rp. 3,458.33 Rp. 44,015.15 12.12121212121
0.2030 Zak Semen Portland (PC) @Rp. 42,000.00 Rp. 8,526.00
Zak Semen Putih @Rp. 55,000.00 Rp. -
0.0321 Pasir Pasang @Rp. 130,000.00 Rp. 4,173.00
1.0000 Upah Tenaga @Rp. 14,559.00 Rp. 14,559.00
Rp. 71,273.15
21.0000 Bh Keramik 20 x 25 @Rp. 1,750.00 Rp. 36,750.00 20
2. Analisa 1 M3 Beton Tumbuk ad. 1 : 3 : 5
M3
M3
3. Analisa 1 M2 Pasangan Lantai Keramik 40 x 40 cm 1 : 6 tebal 3cm
M3
3. Analisa 1 M2 Pasangan Lantai Keramik 33 x 33 cm 1 : 6 tebal 3cm
M3
3. Analisa 1 M2 Pasangan Lantai Keramik 30 x 30 cm 1 : 6 tebal 3cm
M3
3. Analisa 1 M2 Pasangan Lantai Keramik 30 x 30 cm 1 : 6 tebal 3cm bagus
M3
3. Analisa 1 M2 Pasangan Lantai Keramik 20 x 20 cm 1 : 6 tebal 3cm
M3
3. Analisa 1 M2 Pasangan keramik dinding 25 x 33 cm 1 : 6 tebal 3cm
M3
3. Analisa 1 M2 Pasangan Keramik dinding 20 x 25 cm 1 : 6 tebal 3cm
Hal 13/46
0.2030 Zak Semen Portland (PC) @Rp. 42,000.00 Rp. 8,526.00
Zak Semen Putih @Rp. 55,000.00 Rp. -
0.0321 Pasir Pasang @Rp. 130,000.00 Rp. 4,173.00
1.0000 Upah Tenaga @Rp. 14,559.00 Rp. 14,559.00
Rp. 64,008.00
4.2000 Bh Keramik 25 x 6 @Rp. 16,000.00 Rp. 67,200.00 4
0.0122 Zak Semen Portland (PC) @Rp. 42,000.00 Rp. 511.56
Zak Semen Putih @Rp. 55,000.00 Rp. -
0.0019 Pasir Pasang @Rp. 130,000.00 Rp. 250.38
0.0600 Upah Tenaga @Rp. 14,559.00 Rp. 873.54
Rp. 68,835.48
5.2500 Bh Keramik 20 x 6 @Rp. 6,000.00 Rp. 31,500.00 5
0.0122 Zak Semen Portland (PC) @Rp. 42,000.00 Rp. 511.56
Zak Semen Putih @Rp. 55,000.00 Rp. -
0.0019 Pasir Pasang @Rp. 130,000.00 Rp. 250.38
0.0600 Upah Tenaga @Rp. 14,559.00 Rp. 873.54
Rp. 33,135.48
1.2000 Batu Koral Sikat @Rp. 75,000.00 Rp. 90,000.00
0.3000 Zak Semen Portland (PC) @Rp. 42,000.00 Rp. 12,600.00
0.0321 Pasir Pasang @Rp. 130,000.00 Rp. 4,173.00
0.3500 Tukang @Rp. 43,000.00 Rp. 15,050.00 41,370.00
0.0350 Kepala Tukang @Rp. 47,000.00 Rp. 1,645.00
0.7000 Pekerja @Rp. 33,000.00 Rp. 23,100.00
0.0350 Mandor @Rp. 45,000.00 Rp. 1,575.00
Rp. 148,143.00
1.0500 Batu Alam @Rp. 130,000.00 Rp. 136,500.00
0.2030 Zak Semen Portland (PC) @Rp. 42,000.00 Rp. 8,526.00
0.0321 Pasir Pasang @Rp. 130,000.00 Rp. 4,173.00
0.3500 Tukang @Rp. 43,000.00 Rp. 15,050.00 38,505.00
0.0350 Kepala Tukang @Rp. 47,000.00 Rp. 1,645.00
0.6200 Pekerja @Rp. 33,000.00 Rp. 20,460.00
0.0300 Mandor @Rp. 45,000.00 Rp. 1,350.00
Rp. 187,704.00
5.6750 Zak Semen Portland (PC) @Rp. 42,000.00 Rp. 238,350.00
Pasir Pasang @Rp. 130,000.00 Rp. -
Koral Beton @Rp. 170,000.00 Rp. -
1.0000 Upah Tenaga @Rp. 69,975.00 Rp. 69,975.00
Rp. 308,325.00
VI. PEKERJAAN ATAP
0.2625 btg Kayu Bengkirai @Rp. 200,000.00 Rp. 52,500.00
0.0190 Kg Paku Biasa @Rp. 15,000.00 Rp. 285.00
0.0518 Tukang @Rp. 43,000.00 Rp. 2,227.40 3,080.83
0.0052 Kepala Tukang @Rp. 47,000.00 Rp. 243.65
0.0173 Pekerja @Rp. 33,000.00 Rp. 570.90
0.0009 Mandor @Rp. 45,000.00 Rp. 38.88
Rp. 55,865.83
0.5500 btg Kayu Usuk 5/7 @Rp. 85,000.00 Rp. 46,750.00
0.8250 btg Kayu Reng 2/3 @Rp. 13,000.00 Rp. 10,725.00
M3
3. Analisa 1 M1 Pasangan List Keramik 25 x 6 cm 1 : 6 tebal 3cm
M3
3. Analisa 1 M1 Pasangan List Keramik 20 x 6 cm 1 : 6 tebal 3cm
M3
8. Analisa 1 M2 Pasangan Lantai Batu Koral SikatM2
M3
9. Analisa 1 M2 Pasangan Dinding Batu AlamM2
M3
10. Analisa 1 M3 Rabat Beton ad. 1 : 2 : 3
M3
M3
1. Analisa 1 M1 Pekerjaan Murplat, Gording, Nok, Jurai
2. Analisa 1 M2 Pasang Usuk dan Reng
Hal 14/46
0.2500 Kg Paku Biasa @Rp. 15,000.00 Rp. 3,750.00
0.2000 Tukang @Rp. 43,000.00 Rp. 8,600.00 16,590.00
0.0200 Kepala Tukang @Rp. 47,000.00 Rp. 940.00
0.2000 Pekerja @Rp. 33,000.00 Rp. 6,600.00
0.0100 Mandor @Rp. 45,000.00 Rp. 450.00
Rp. 77,815.00
10.0000 Bh Genteng Beton @Rp. 3,500.00 Rp. 35,000.00
0.1000 Tukang @Rp. 43,000.00 Rp. 4,300.00 11,820.00
0.0100 Kepala Tukang @Rp. 47,000.00 Rp. 470.00
0.2000 Pekerja @Rp. 33,000.00 Rp. 6,600.00
0.0100 Mandor @Rp. 45,000.00 Rp. 450.00
Rp. 46,820.00
4. Analisa 1 M' Pasang Bubungan Genteng Beton3.5000 Bh Bubungan Genteng Beton @Rp. 3,800.00 Rp. 13,300.00
0.2000 Zak Semen Portland (PC) @Rp. 42,000.00 Rp. 8,400.00
0.0330 Pasir Pasang @Rp. 130,000.00 Rp. 4,290.00
0.2000 Tukang @Rp. 43,000.00 Rp. 8,600.00 23,640.00
0.0200 Kepala Tukang @Rp. 47,000.00 Rp. 940.00
0.4000 Pekerja @Rp. 33,000.00 Rp. 13,200.00
0.0200 Mandor @Rp. 45,000.00 Rp. 900.00
Rp. 49,630.00
5. Analisa 1 M' Listplank Woodplank ex. Elephant Double0.5250 lbr Papan 2/20 @Rp. 45,000.00 Rp. 23,625.00
0.0250 Kg Paku Biasa @Rp. 15,000.00 Rp. 375.00
0.2000 Tukang @Rp. 43,000.00 Rp. 8,600.00 17,741.50
0.0520 Kepala Tukang @Rp. 47,000.00 Rp. 2,444.00
0.1900 Pekerja @Rp. 33,000.00 Rp. 6,270.00
0.0095 Mandor @Rp. 45,000.00 Rp. 427.50
Rp. 41,741.50
6. Analisa 1 M' Papan Sirip0.2625 m3 Papan 2/20 @Rp. 45,000.00 Rp. 11,812.50
0.0250 kg Paku @Rp. 15,000.00 Rp. 375.00
0.0200 Tukang @Rp. 43,000.00 Rp. 860.00 2,454.00
0.0020 Kepala Tukang @Rp. 47,000.00 Rp. 94.00
0.0400 Pekerja @Rp. 33,000.00 Rp. 1,320.00
0.0040 Mandor @Rp. 45,000.00 Rp. 180.00
Rp. 14,641.50
7. Analisa 10 M' Talang Datar dengan Papan Talang10.0000 m1 Lembar Seng @Rp. 25,000.00 Rp. 250,000.00
5.5000 lbr Papan 2/20 @Rp. 45,000.00 Rp. 247,500.00
8.0000 Tukang @Rp. 43,000.00 Rp. 344,000.00 557,850.00
0.8000 Kepala Tukang @Rp. 47,000.00 Rp. 37,600.00
5.0000 Pekerja @Rp. 33,000.00 Rp. 165,000.00
0.2500 Mandor @Rp. 45,000.00 Rp. 11,250.00
Rp. 1,055,350.00
Untuk 1 M' = 1/10 Rp. 105,535.00
VII. PEKERJAAN PLAFOND DAN RANGKA
0.3830 lbr Gypsum 12 mm @Rp. 46,000.00 Rp. 17,618.00
1.0500 btng Besi Hollow @Rp. 18,000.00 Rp. 18,900.00
0.1300 Kg Kawat Penggantung @Rp. 12,000.00 Rp. 1,560.00
38.0000 bh Skrup Board @Rp. 25.00 Rp. 950.00
2.1000 bh Skrup Join Hollow @Rp. 100.00 Rp. 210.00
3. Analisa 1 M2 Pasang Atap Genteng Beton flat
M3
1. Analisa 1 M2 Pasang Plafond Gypsum 12 mm
Hal 15/46
0.0124 dos Paku Beton @Rp. 20,000.00 Rp. 248.00
0.0370 rol Lakban kain @Rp. 15,000.00 Rp. 555.00
0.0247 zak Compound @Rp. 60,000.00 Rp. 1,482.00
0.4000 Tukang @Rp. 43,000.00 Rp. 17,200.00 23,010.00
0.0400 Kepala Tukang @Rp. 47,000.00 Rp. 1,880.00
0.1000 Pekerja @Rp. 33,000.00 Rp. 3,300.00
0.0140 Mandor @Rp. 45,000.00 Rp. 630.00
Rp. 64,533.00
0.3830 lbr Kalsiboard 4,5 mm @Rp. 46,000.00 Rp. 17,618.00
1.0500 btng Besi Hollow @Rp. 18,000.00 Rp. 18,900.00
0.1300 Kg Kawat Penggantung @Rp. 12,000.00 Rp. 1,560.00
38.0000 bh Skrup Board @Rp. 25.00 Rp. 950.00
2.1000 bh Skrup Join Hollow @Rp. 100.00 Rp. 210.00
0.0124 dos Paku Beton @Rp. 20,000.00 Rp. 248.00
0.0370 rol Lakban kain @Rp. 15,000.00 Rp. 555.00
0.0247 zak Compound @Rp. 60,000.00 Rp. 1,482.00
0.4000 Tukang @Rp. 43,000.00 Rp. 17,200.00 23,010.00
0.0400 Kepala Tukang @Rp. 47,000.00 Rp. 1,880.00
0.1000 Pekerja @Rp. 33,000.00 Rp. 3,300.00
0.0140 Mandor @Rp. 45,000.00 Rp. 630.00
Rp. 64,533.00
3. Analisa 10 M' Pasang List Profil Gypsum10.0000 m' List Gypsum @Rp. 12,000.00 Rp. 120,000.00
0.5000 Tukang @Rp. 43,000.00 Rp. 21,500.00 41,700.00
0.0500 Kepala Tukang @Rp. 47,000.00 Rp. 2,350.00
0.5000 Pekerja @Rp. 33,000.00 Rp. 16,500.00
0.0300 Mandor @Rp. 45,000.00 Rp. 1,350.00
Rp. 161,700.00
Untuk 1 M' = 1/10 Rp. 16,170.00
VIII. PEKERJAAN PINTU DAN JENDELA
1.1000 Kayu Jati @Rp. 6,000,000.00 Rp. 6,600,000.00
22.5000 Tukang @Rp. 43,000.00 Rp. 967,500.00 1,387,125.00
2.2500 Kepala Tukang @Rp. 47,000.00 Rp. 105,750.00
9.0000 Pekerja @Rp. 33,000.00 Rp. 297,000.00
0.3750 Mandor @Rp. 45,000.00 Rp. 16,875.00
Rp. 7,987,125.00
2. Analisa 1 M2 Daun Pintu Panil Jati (KW II)0.0350 m3 Kayu Jati @Rp. 6,000,000.00 Rp. 210,000.00
0.1000 kg Paku Biasa @Rp. 15,000.00 Rp. 1,500.00
5.0000 Tukang @Rp. 43,000.00 Rp. 215,000.00 296,662.50
0.5000 Kepala Tukang @Rp. 47,000.00 Rp. 23,500.00
1.6500 Pekerja @Rp. 33,000.00 Rp. 54,450.00
0.0825 Mandor @Rp. 45,000.00 Rp. 3,712.50
Rp. 508,162.50
0.0132 m3 Kayu Jati @Rp. 6,000,000.00 Rp. 79,200.00
0.7500 m2 Kaca Bening 5mm @Rp. 60,000.00 Rp. 45,000.00
4.0000 Tukang @Rp. 43,000.00 Rp. 172,000.00 237,060.00
0.4000 Kepala Tukang @Rp. 47,000.00 Rp. 18,800.00
1.3200 Pekerja @Rp. 33,000.00 Rp. 43,560.00
0.0600 Mandor @Rp. 45,000.00 Rp. 2,700.00
Rp. 361,260.00
2. Analisa 1 M2 Pasang Plafond Kalsiboard 4,5 mm
1. Analisa 1 M3 Kusen Kayu Jati (KW II)M3
3. Analisa 1 M2 Daun Jendela Jati Kaca Bening 5 mm (KW II)
Hal 16/46
1.1000 m2 Kaca Bening 5mm @Rp. 60,000.00 Rp. 66,000.00
0.0150 Tukang @Rp. 60,000.00 Rp. 900.00 8,079.75
0.1500 Kepala Tukang @Rp. 43,000.00 Rp. 6,450.00
0.0150 Pekerja @Rp. 47,000.00 Rp. 705.00
0.0008 Mandor @Rp. 33,000.00 Rp. 24.75
Rp. 74,079.75
1.1000 m2 Kaca Bening 10mm @Rp. 250,000.00 Rp. 275,000.00
0.0150 Tukang @Rp. 60,000.00 Rp. 900.00 8,079.75
0.1500 Kepala Tukang @Rp. 43,000.00 Rp. 6,450.00
0.0150 Pekerja @Rp. 47,000.00 Rp. 705.00
0.0008 Mandor @Rp. 33,000.00 Rp. 24.75
Rp. 283,079.75
IX. PEKERJAAN PENGECATAN
1.6670 Kg Cat Tembok 2x @Rp. 70,000.00 Rp. 116,690.00
0.8330 Kg Alkali 1x @Rp. 23,750.00 Rp. 19,783.75
2.0000 Lbr Amplas Biasa @Rp. 600.00 Rp. 1,200.00
0.1000 bh Rol cat @Rp. 12,500.00 Rp. 1,250.00
1.0000 Stegger @Rp. 5,000.00 Rp. 5,000.00
0.6300 Tukang @Rp. 43,000.00 Rp. 27,090.00 37,776.00
0.0630 Kepala Tukang @Rp. 47,000.00 Rp. 2,961.00
0.2000 Pekerja @Rp. 33,000.00 Rp. 6,600.00
0.0250 Mandor @Rp. 45,000.00 Rp. 1,125.00
Rp. 181,699.75
Rp. 18,169.98
1.6670 Kg Cat Tembok 2x @Rp. 26,000.00 Rp. 43,342.00
0.8330 Kg Alkali 1x @Rp. 23,750.00 Rp. 19,783.75
2.0000 Lbr Amplas Biasa @Rp. 600.00 Rp. 1,200.00
0.1000 bh Rol cat @Rp. 12,500.00 Rp. 1,250.00
1.0000 Stegger @Rp. 5,000.00 Rp. 5,000.00
1.0000 Upah Tenaga @Rp. 37,776.00 Rp. 37,776.00
Rp. 108,351.75
Rp. 10,835.18
1.6670 Kg Cat Tembok 2x @Rp. 55,000.00 Rp. 91,685.00
0.8330 Kg Alkali 1x @Rp. 23,750.00 Rp. 19,783.75
2.0000 Lbr Amplas Biasa @Rp. 600.00 Rp. 1,200.00
0.1000 bh Rol cat @Rp. 12,500.00 Rp. 1,250.00
1.0000 Stegger @Rp. 5,000.00 Rp. 5,000.00
1.0000 Upah Tenaga @Rp. 37,776.00 Rp. 37,776.00
Rp. 156,694.75
Rp. 15,669.48
3.7500 Kg Cat Tembok 3x @Rp. 18,000.00 Rp. 67,500.00
0.5000 Lbr Amplas Biasa @Rp. 600.00 Rp. 300.00
0.0100 bh Rol cat @Rp. 12,500.00 Rp. 125.00
1.0000 Stegger @Rp. 5,000.00 Rp. 5,000.00
1.0000 Upah Tenaga @Rp. 37,776.00 Rp. 37,776.00
Rp. 110,701.00
Rp. 11,070.10
2.0000 Kg Coating Sicosol @Rp. 45,000.00 Rp. 90,000.00
0.3500 Tukang @Rp. 43,000.00 Rp. 15,050.00 41,370.00
4. Analisa 1 M2 Jendela Mati Kaca Bening 5 mm
5. Analisa 1 M2 Jendela Mati Kaca Bening 10 mm
1. Analisa 10 M2 Pengecatan Tembok 3x sapu Eksterior ex. Dulux
Untuk 1 M2
1. Analisa 10 M2 Pengecatan Tembok 3x sapu Eksterior ex. Flinkote
Untuk 1 M2
1. Analisa 10 M2 Pengecatan Tembok 3x sapu Eksterior ex. Mowilex
Untuk 1 M2
2. Analisa 10 M2 Pengecatan Tembok 3x sapu Interior ex. Catylac
Untuk 1 M2
3. Analisa 10 M2 Coating Batu Alam
Hal 17/46
0.0350 Kepala Tukang @Rp. 47,000.00 Rp. 1,645.00
0.7000 Pekerja @Rp. 33,000.00 Rp. 23,100.00
0.0350 Mandor @Rp. 45,000.00 Rp. 1,575.00
Rp. 131,370.00
Rp. 13,137.00
2.8400 Kg Cat Kilat @Rp. 60,000.00 Rp. 170,400.00
1.4200 Kg Cat Dasar @Rp. 20,000.00 Rp. 28,400.00
2.0000 Ltr Minyak Cat @Rp. 5,500.00 Rp. 11,000.00
1.2000 Kg Cat Meni Nippon @Rp. 15,000.00 Rp. 18,000.00
0.8000 Kg Plamir kayu @Rp. 11,000.00 Rp. 8,800.00
3.0000 Lbr Amplas Niken @Rp. 2,500.00 Rp. 7,500.00
2.2500 Tukang @Rp. 43,000.00 Rp. 96,750.00 160,200.00
0.2250 Kepala Tukang @Rp. 47,000.00 Rp. 10,575.00
1.5000 Pekerja @Rp. 33,000.00 Rp. 49,500.00
0.0750 Mandor @Rp. 45,000.00 Rp. 3,375.00
Rp. 404,300.00
Rp. 6,064.50
2.5000 Kg Cat Tembok maxilite @Rp. 8,800.00 Rp. 22,000.00
1.0000 Ls Alat Bantu / Steiger @Rp. 12,000.00 Rp. 12,000.00
0.6300 Tukang @Rp. 43,000.00 Rp. 27,090.00 37,776.00
0.0630 Kepala Tukang @Rp. 47,000.00 Rp. 2,961.00
0.2000 Pekerja @Rp. 33,000.00 Rp. 6,600.00
0.0250 Mandor @Rp. 45,000.00 Rp. 1,125.00
Rp. 71,776.00
Rp. 7,177.60
X. PEKERJAAN LAIN-LAIN
0.7500 Pekerja @Rp. 33,000.00 Rp. 24,750.00 26,437.50
0.0375 Mandor @Rp. 45,000.00 Rp. 1,687.50
Rp. 26,437.50
Rp. 2,643.75
Untuk 1 M2
4. Analisa 10 M2 Pengecatan Kayu Mengkilat 3x sapu
Untuk 1 M1
5. Analisa 10 M2 Cat Plafond 3x sapu
Untuk 1 M2
1. Analisa 10 M2 Analisa Pembersihan Akhir Lapangan
Untuk 1 M2 = 1/10
nama
luas tanah 144.700
luas lt 1 89.700
luas lt 2 76.580
166.280 luas thp 1
t1
bowplang 48.000
pondasi 48.710
41.780
90.490
t1
galian tanah pondasi
0.831 75.224
urugan tanah kembali
25.075
urugan pasir
0.070 6.334
anstamping
0.140 12.669
pondasi batu belah
0.300 27.371
footplat
26.000 0.107 2.776 lantai kerja
0.034 0.878 0.832
3.653
slof 15/20
0.000
0.000 0.030 0.000
slof 15/25
90.490
-2.830
6.000
0.000
93.660 0.038 3.512
kolom praktis
tahap 1 tahap 2
0.023 0.799 0.023 1.013
KOLOM tahap 1 tahap 2
0.060 0.000 0.060 0.000
15 30 0.045 4.075 0.045 2.363
TAHAP 1 RUMAH LB=89,7 / LT=144,7 m2
TAHAP 2 RUMAH LB=76,58 / LT=144,7 m2
TAHAP 1+2 RUMAH LB=166,28/ LT=144,7 m2
15 25 0.038 0.000 0.038 0.000
15 20 0.030 0.000 0.030 0.000
20 20 0.560
tahap 1
BALOK
15 30 51.450 20 40 0.608
51.520
0.000
102.970 0.027 3.388
15 25
0.000
0.000 0.020 0.000
15 20
ring balk 13.450
konsol
gunungan1
balok latey1 16.110
29.560 0.030 0.887
15 15
0.023 0.000
tahap 2
15 30 17.670
6.100
0.000
23.770 0.045 1.070
15 25
0.000
0.000 0.063 0.000
RING BALK
15 20 31.550
26.400
latey 15/20
gunungan 0.000 0.866
0.000 0.866
0.000 0.866
0.000 0.866
0.000 0.866
0.000 0.866
57.950 0.030 1.738
plat 12 cm tahap 1
82.350
82.350 0.120 9.882
plat 12 cm tahap 2
0.000 0.120 0.000
plat 10 cm tahap 1
0.000 0.100 0.000
plat 10 cm tahap 2
17.380
17.380 0.100 1.738
lefel 8 cm tahap1
2.136
4.200 6.336
kantilefer
2.800 dapur
9.136 0.080 1.614
lefel 8 tahap 2
16.180
.
dapur
16.180 0.080 1.294
waterproof 125.046 0.000
compound 39.896
PLAT TANGGA
1.080
1.080
DINDING
TAHAP 1
total pelubang eksterior interior
lt1 260.960 281.532 dinding pagar
45.140 samping 19.600
36.050 31.360
81.190 3.400 271.246
plesteran 542.492
lt2 175.780 162.960
29.350
31.100
60.450 3.400 169.370
plesteran 338.740
lt3
0.000 0.000
0.000 3.550 0.000
plesteran 0.000
tahap 1 jumlah luas panjang unting luas total pjg total d kayu d kaca
P1 1.000 6.700 7.640 2.000 0.075 6.700 7.790
P2 4.000 2.300 5.840 2.000 0.075 9.200 23.960
P3 2.000 1.780 5.140 2.000 0.075 3.560 10.580
PJ1 1.000 6.300 13.200 4.000 0.075 6.300 13.500
PJ2 6.300 13.200 4.000 0.075 0.000 0.000
PJ3 4.800 12.200 3.000 0.075 0.000 0.000
J1 4.400 11.960 4.000 0.075 0.000 0.000
J2 3.800 11.520 4.000 0.075 0.000 0.000
J3 4.000 2.600 8.340 4.000 0.075 10.400 34.560
j4 1.800 7.080 4.000 0.075 0.000 0.000
36.160 90.390 0.000 0.000
melamin 72.320
a. Engsel pintu (per pintu 3 bh / 1,5 psng)
b. Kunci tanam 2x slag + handle
c. Door stoper
TAHAP 2 jumlah luas panjang unting luas total pjg total d kayu d kaca
P1 6.700 7.640 2.000 0.075 0.000 0.000
P2 2.000 2.300 5.840 2.000 0.075 4.600 11.980
P3 1.000 1.780 5.140 2.000 0.075 1.780 5.290
PJ1 6.300 13.200 4.000 0.075 0.000 0.000
PJ2 1.000 6.300 13.200 4.000 0.075 6.300 13.500
PJ3 1.000 4.800 12.200 3.000 0.075 4.800 12.425
J1 1.000 4.400 11.960 4.000 0.075 4.400 12.260
J2 1.000 3.800 11.520 4.000 0.075 3.800 11.820
J3 3.000 2.600 8.340 4.000 0.075 7.800 25.920
j4 1.000 1.800 7.080 4.000 0.075 1.800 7.380
35.280 100.575 0.000 0.000
melamin 70.560
a. Engsel pintu (per pintu 3 bh / 1,5 psng)
b. Kunci tanam 2x slag + handle
c. Door stoper
TAHAP 1 TAHAP 2
pasang batu andesit susun sirih
pasang batu alam 20.100
BETON TUMBUK
t1 t2
95.700 0.050 4.785
T1 T2
karpot
K50
k40 74.700 45.100
K33 6.150 19.430
k30 5.900 2.100
K2525
K2533 24.720 9.860
K2020
K2025
kol kolan 70.420 54.760
ps urug 4.785
PEKERJAAN ATAP
talang 1 talang 2
8.000
0.000 0.866 8.000 0.866
0.000 9.238
luas atap
tahap 1 tahap2
89.900
0.000 0.86603 0.000 89.900 0.866025 103.808
KERPUS
t1 t2
27.240
0.000 0.866 27.240 0.866
0.000 37.204
Pas. Listplank T1 T2
40.500 0.8660250.866025
0.000 40.500
pasang gording T1 T2
0.000 0.000
PLAFOND T1 T2
75.800 63.100
75.800 63.100
LIS T1 T2
89.800 61.200
89.800 61.200
TRITISAN T1 T2
29.840
0.000 29.840
pipa
tahap 1 tahap 2
5" 4" 3" 3/4" 1/2" panas 4" 3" 3/4" 1/2" panas
23.000 12.000 31.600 10.000 12.000 10.000 13.000
25.000 20.500
11.800 42.000
5" 4" 3" 3/4" 1/2" panas 4" 3" 1/2" 1/2" panas
23.000 0.000 48.800 73.600 10.000 0.000 12.000 30.500 13.000
X. PEKERJAAN LAIN-LAIN t1 t2
1 Pasang railing besi tempa 11.06 19.900
2 Pasang lampu gantung 1.00 1.000 bh
3 Pasang lampu downlight SL 11.00 10.000 bh
4 Pasang lampu SL tempel bh
5 Pasang lampu taman 1.00 bh
6 Pasang lampu uplight kolam bh
7 Pasang lampu spot dinding bh
8 Pasang lampu downlight halogen 6.00 6.000 bh
9 Pasang saklar 10.00 8.000 bh
10 Pasang stop kontak 13.00 10.000 bh
11 Pasang titik lampu + stop kontak 32.00 27.00 bh
12 Pasang MCB 1.00 1.000 bh
13 Pipa PVC diameter 5" D 23.00
14 Pipa PVC diameter 4" D 0.00 0.000
15 Pipa PVC diameter 3" D 48.80 12.000
16 Pipa PVC diameter 3/4" AW 73.60 30.500
17 Pipa PVC diameter 1/2 " AW air panas 10.00 13.000
18 Kran tempel 3.00 2.000 bh
19 Floor drain (avour) 2.00 7.000 bh
20 Kloset duduk 2.00 1.000 bh
21 Kloset jongkok bh
22 Kitchen zink 1.00 bh
23 wastafel
24 Keran panas dingin 1.00 1.00 bh
25 Pembersihan akhir 89.70 76.580
pagar
panjang
galian tanah pondasi
0.831 0.000
urugan tanah kembali
0.000
urugan pasir
0.070 0.000
anstamping
0.140 0.000
pondasi batu belah
0.300 0.000
m1
m1
m1
m1
m1
m1
m2
slof 15/20
0.000
0.000
0.000 0.030 0.000
kolom praktis0.023 2.250 0.000
ring balk 15/20
0.000 0.030 0.000
Pas. Dinding Bata adukan 1 : 8
0
Plesteran Dinding Bata adukan 1 : 8
0
d jendela bv roster skonengan tatapan melamin pintu
1.000 7.640 7.640 0.000 0.000
5.840 23.360 0.000 0.000
5.140 10.280 0.000 0.000
0.000 0.000 0.000
8.680
8.680
8.480
1.000 18.000 8.410 0.000 0.000 0.000
7.800 0.000 0.000 0.000
6.480 25.920 0.000 0.000
6.360 0.000 0.000 0.000
0.000 0.000 0.000
0.000 2.000 18.000 67.200 0.000 0.000
0.000
d jendela bv roster skonengan tatapan melamin pintu
1.000 7.640 0.000 0.000 0.000
5.840 11.680 0.000 0.000
5.140 5.140 0.000 0.000
0.000 0.000 0.000
8.680
8.680
8.480
1.000 18.000 8.410 8.410 0.000 0.000
7.800 7.800 0.000 0.000
6.480 19.440 0.000 0.000
6.360 6.360 0.000 0.000
58.830 0.000 0.000
0.000 2.000 18.000 0.000
Halaman 29/46RENCANA ANGGARAN BIAYA (KESELURUHAN)
PROYEK RUMAH TINGGAL TYPE 46/90 M2 (Bpk. REDY)
NO URAIAN PEKERJAAN Volume SATharga satuan JUMLAH BOBOT
(Rp) (Rp) %
I. PEKERJAAN PERSIAPAN
1 Pembersihan lapangan 90.00 5,550.00 499,500.00 0.42
2 Pengukuran dan pasang bouwplank 42.00 16,395.00 688,590.00 0.58
3 Air Kerja dan Listrik 2.00 bln 300,000.00 600,000.00 0.50
4 Bedeng Dan Gudang 1.00 ls ### 2,000,000.00 1.67
5 Mobilisasi & demobilisasi 2.00 bln 500,000.00 1,000,000.00 0.84
4,788,090.00 4.00
II. PEKERJAAN PONDASI
1 Galian tanah pondasi 58.72 25,875.00 1,519,380.00 1.27
2 Urugan tanah kembali bekas galian 14.70 8,628.00 126,831.60 0.11
3 Urugan pasir bawah pondasi 4.95 118,350.00 585,832.50 0.49
4 Pasangan pondasi batu belah ad 1 : 8 21.05 401,095.00 8,443,049.75 7.05
5 Pasangan Rolag batu belah ad 1 : 8 0.70 401,095.00 280,766.50 0.23
10,955,860.35 9.15
III. PEK. BETON BERTULANG Ad. 1:2:3
1 Sloof 15/20 1.94 2,608,984.40 5,061,429.74 4.23
2 Kolom Praktis 15/15 Lt.1 2.16 2,449,942.91 5,291,876.69 4.42
3 Balok Latey 15/20 Lt.1 0.40 2,550,763.07 1,020,305.23 0.85
4 Leufel t = 8 cm Lt.1 0.48 2,198,797.63 1,055,422.86 0.88
5 Plat dapur t = 8 cm 0.09 2,198,797.63 197,891.79 0.17
6 Kuda-kuda beton 15/20 0.70 2,550,763.07 1,785,534.15 1.49
7 Ringbalk 15/20 1.67 2,550,763.07 4,259,774.33 3.56
18,672,234.80 15.60
IV. PEKERJAAN DINDING DAN PLESTERAN
1 Pas. Dinding Bata adukan 1 : 8 Lt.1 229.97 64,535.00 14,841,113.95 12.40
2 Plesteran Dinding Bata adukan 1 : 8 Lt.1 442.62 32,950.00 14,584,329.00 12.18
3 Tali air Aluminium 1.30 15,000.00 19,500.00 0.02
4 Batu Alam andesit garis 2.22 187,704.00 416,702.88 0.35
5 Batu Alam acak 3.20 187,704.00 600,652.80 0.50
30,462,298.63 25.45
V. PEKERJAAN LANTAI
1 Rabat Beton Tumbuk t = 5 cm 2.50 452,410.00 1,131,025.00 0.94
2 Pasir Urug Bawah Lantai t=3 cm 1.50 118,350.00 177,525.00 0.15
3 Pas. Keramik 40/40 Ruangan ex. Platinum 41.37 81,945.50 3,390,085.34 2.83
4 Pas. Keramik 30/30 Teras,garasi ex. Platinum 5.85 64,379.21 376,618.39 0.31
5 Pas. Keramik Lantai KM/WC 25/25 ex Platinum 2.62 60,858.00 159,447.96 0.13
6 Pas. Keramik Dinding KM/WC 25/33 ex Platinum 10.40 80,590.00 838,136.00 0.70
7 Pas. List Keramik KM/WC 6/25 ex. Platinum 5.20 M' 68,835.48 357,944.50 0.30
8 Pas. Keramik Dapur 20/20 ex Platinum 3.00 72,340.00 217,020.00 0.18
9 Perkerasan Paving Carport 13.50 77,500.00 1,046,250.00 0.87
m2
m1
m3
m3
m3
m3
m3
M3
M3
M3
M3
M3
M3
M3
M2
M2
M2
M2
M2
M3
M3
M2
M2
M2
M2
M2
M2
Halaman 30/46RENCANA ANGGARAN BIAYA (KESELURUHAN)
PROYEK RUMAH TINGGAL TYPE 46/90 M2 (Bpk. REDY)
NO URAIAN PEKERJAAN Volume SATharga satuan JUMLAH BOBOT
(Rp) (Rp) %
7,694,052.18 6.43
VI. PEKERJAAN ATAP
1 Pas. Rangka Atap Baja Ringan biasa 64.00 90,000.00 5,760,000.00 4.81
2 Pas. Gording CNP 44.60 40,000.00 1,784,000.00 1.49
3 Pas. Atap Genteng Beton Flat ex. Cemara 64.00 46,820.00 2,996,480.00 2.50
4 Pas. Aluminium Foil 64.00 10,000.00 640,000.00 0.53
5 Pas. Kerpus Genteng 6.60 M' 49,630.00 327,558.00 0.27
6 Pas. Genteng Tepi 5.90 M' 25,000.00 147,500.00 0.12
7 Pas. Listplank Woodplank ex. Elephant 18.50 M' 41,741.50 772,217.75 0.65
12,427,755.75 10.38
VII. PEKERJAAN PLAFOND DAN RANGKA
1 Pasang Plafond Gypsum 9 mm ex. Elephant 40.25 64,533.00 2,597,453.25 2.17
2 Pasang List Profil Gypsum Ruangan 56.75 M' 16,170.00 917,647.50 0.77
3 Pasang Plafond Kalsiboard (Tritisan) 12.77 64,533.00 824,086.41 0.69
4,339,187.16 3.62
VIII. PEKERJAAN PINTU DAN JENDELA
1 Kusen Aluminium 4" coklat 60.45 M' 55,000.00 3,324,750.00 2.78
2 Tatapan Pintu 20.10 M' 10,000.00 201,000.00 0.17
3 Daun Pintu Panil 4.00 lbr ### 5,400,000.00 4.51
4 Daun Pintu PVC 1.00 lbr 250,000.00 250,000.00 0.21
5 Daun Jendela Aluminium + Kaca Bening 5mm 7.00 lbr 450,000.00 3,150,000.00 2.63
6 Daun Jendela Aluminium + Kaca Bening 5mm BV 1.00 lbr 325,000.00 325,000.00 0.27
7 Kaca mati 5mm 1.60 bh 74,079.75 118,527.60 0.10
8 Pekerjaan Aksesoris Pintu dan Jendela :
a. Engsel Pintu (per pintu 3 bh/1,5 Pasang) ex So 6.00 psng 35,000.00 210,000.00 0.18
b. Kunci Tanam 2x Slag Pintu Ruangan ex. SES 4.00 bh 105,000.00 420,000.00 0.35
c. Handle Pintu Ruangan ex. Dexon 4.00 bh 60,000.00 240,000.00 0.20
d. Door Stoper ex. Gerber 4.00 bh 22,500.00 90,000.00 0.08
13,729,277.60 11.47
IX. PEKERJAAN PENGECATAN
1 Pengecatan tembok ext mowilex 86.71 15,669.48 1,358,700.18 1.14
2 Pengecatan tembok interior Eco Emulsion 144.58 11,070.10 1,600,515.06 1.34
3 Pengecatan plafond 3 x sapu Maxilite 59.04 7,177.60 423,765.50 0.35
4 Melamin daun pintu panil 13.86 65,000.00 900,900.00 0.75
5 Cat Lis Plafond Gypsum ex. Maxilite 56.75 1,500.00 85,125.00 0.07
6 Coating Batu Alam ex. Propan Stone Care 5.42 13,137.00 71,202.54 0.06
7 Compound Plat Leufel 6.02 15,000.00 90,300.00 0.08
8 Cat Genteng 64.00 7,177.60 459,366.40 0.38
9 Pengecatan listplank 18.50 6,064.50 112,193.25 0.09
5,102,067.93 4.26
M2
M2
M2
M2
M2
M2
m3
m2
m2
m2
m1
m2
m2
m2
m2
Halaman 31/46RENCANA ANGGARAN BIAYA (KESELURUHAN)
PROYEK RUMAH TINGGAL TYPE 46/90 M2 (Bpk. REDY)
NO URAIAN PEKERJAAN Volume SATharga satuan JUMLAH BOBOT
(Rp) (Rp) %
X. PEKERJAAN LAIN-LAIN
1 Pasang Lampu Taman ex. Zetalux 2.00 bh 155,000.00 310,000.00 0.26
2 Pasang Lampu Fitting SL ex. Philips 7.00 bh 40,000.00 280,000.00 0.23
3 Pasang Lampu Halogen 2.00 bh 75,000.00 150,000.00 0.13
4 Pasang Saklar Tunggal ex.Clipsal 3.00 bh 15,000.00 45,000.00 0.04
5 Pasang Saklar Ganda ex.Clipsal 4.00 bh 20,000.00 80,000.00 0.07
6 Pasang Stop Kontak ex.Broco 5.00 bh 20,000.00 100,000.00 0.08
7 Pasang Titik Lampu + Stop Kontak ex. Supreme 16.00 bh 75,000.00 1,200,000.00 1.00
8 Pasang Panel MCB 6 Group 1.00 bh 300,000.00 300,000.00 0.25
9 Pasang Stop Kontak AC ex.Broco 2.00 bh 45,000.00 90,000.00 0.08
10 Pasang Socket Telepon + Instalasi 1.00 bh 70,000.00 70,000.00 0.06
11 Pasang Socket Antene TV + Instalasi 1.00 bh 70,000.00 70,000.00 0.06
12 Monoblok + Jet Shower ex.HCG 1.00 bh ### 1,350,000.00 1.13
13 Kran Tempel Plastik 2.00 bh 30,000.00 60,000.00 0.05
14 Wash bak 1.00 bh 225,000.00 225,000.00 0.19
15 Kran Bebek dapur 1.00 bh 100,000.00 100,000.00 0.08
16 Kran Shower dingin ex. Washer 1.00 bh 350,000.00 350,000.00 0.29
17 Floor Drain 1.00 bh 32,500.00 32,500.00 0.03
18 Pipa PVC diameter 4" D ex. Wafin 13.00 M' 29,000.00 377,000.00 0.31
19 Pipa PVC diameter 3" D ex. Wafin 30.00 M' 19,000.00 570,000.00 0.48
20 Pipa PVC diameter 3/4" D ex. Maspion AW 29.00 M' 9,000.00 261,000.00 0.22
21 Pipa PVC diameter 1/2" D ex. Maspion AW 15.00 M' 7,000.00 105,000.00 0.09
22 Bak Tandon Air 3000 Lt (bawah) 1.00 M' ### 3,000,000.00 2.51
23 Septictank & Peresapan 1.00 bh ### 1,600,000.00 1.34
24 Pompa Air Shimizu 1.00 bh 450,000.00 450,000.00 0.38
25 Bak Kontrol 2.00 bh 60,000.00 120,000.00 0.10
26 Pembersihan Akhir 90.00 2,643.75 237,937.50 0.20
### 9.63
TOTAL BIAYA PEKERJAAN ### 100.00
2,602,266.56
M2
tenaga+material
Page 32
KESELURUHAN
tenaga+material
Page 33
1 1
1
tenaga
Page 34
KEBUTUHAN TENAGA
tenaga
Page 35
0 1
3
material
Page 36
KEBUTUHAN MATERIAL
material
Page 37
0 1
2
REKAPITULASI RAB PROYEK RUMAH TINGGAL TYPE 46/90 M2 (Bpk. REDY)
BANGKA
NO. URAIAN PEKERJAAN NILAI NILAIPEKERJAAN BOBOT
I. PEKERJAAN PERSIAPAN Rp. 4,788,090.00 4.00
II. PEKERJAAN PONDASI Rp. 10,955,860.35 9.15
III. PEK. BETON BERTULANG Ad. 1:2:3 Rp. 18,672,234.80 15.60
IV. PEKERJAAN DINDING DAN PLESTERAN Rp. 30,462,298.63 25.45
V. PEKERJAAN LANTAI Rp. 7,694,052.18 6.43
VI. PEKERJAAN ATAP Rp. 12,427,755.75 10.38
VII. PEKERJAAN PLAFOND DAN RANGKA Rp. 4,339,187.16 3.62
VIII. PEKERJAAN PINTU DAN JENDELA Rp. 13,729,277.60 11.47
IX. PEKERJAAN PENGECATAN Rp. 5,102,067.93 4.26
X. PEKERJAAN LAIN-LAIN Rp. 11,533,437.50 9.63
JUMLAH Rp. 119,704,261.90 100
Total Biaya Konstruksi Gedung Rp. 119,704,261.90
Semarang, Agustus 2011
Dibuat Oleh :
Ali Muhtarom, ST
TIME SCHEDULEBANGKA
Durasi Bobot 1 2 3 4 Skala
KeteranganNo. Jenis Pekerjaan (Minggu) % 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 %
1 Pekerjaan Persiapan 1 4.00 4.00 100 Masa
Pelaksa-
2 Pekerjaan Pondasi 2 9.15 4.58 4.58 naan
4 bulan
3 Pek. Beton Bertulang 9 15.60 1.73 1.73 1.73 1.73 1.73 1.73 1.73 1.73 1.73
4 Pek. Dinding&Plesteran 11 25.45 2.31 2.31 2.31 2.31 2.31 2.31 2.31 2.31 2.31 2.31 2.31
5 Pekerjaan Lantai 4 6.43 1.61 1.61 1.61 1.61
50
6 Pekerjaan Atap 2 10.38 5.19 5.19 Masa
Pemeli-
7 Pek. Plafond & Rangka 4 3.62 0.91 0.91 0.91 0.91 haraan
1 bulan
8 Pek. Pintu & Jendela 4 11.47 2.87 2.87 2.87 2.87
9 Pekerjaan Pengecatan 5 4.26 0.85 0.85 0.85 0.85 0.85
10 Pekerjaan Lain-Lain 9 9.63 1.07 1.07 1.07 1.07 1.07 1.07 1.07 1.07 1.07 0
51
100
Rencana Prestasi Per Minggu (%) 8.58 6.31 4.05 4.05 4.05 4.05 4.05 5.12 5.12 6.02 12.35 14.81 9.62 6.40 3.53 1.92
Kumulatif Rencana Prestasi Per Minggu (%) 8.58 14.89 18.93 22.98 27.03 31.07 35.12 40.24 45.35 51.38 63.73 78.53 88.15 94.55 98.08 100.00
Termyn per dua minggu
17,818
,643
9,687,9
85
9,687,9
85
10,969
,478
13,3
35,768
32,507
,501
19,16
9,575
6,527,3
26
Akumulasi Termyn
17,818
,643
27,506
,628
37,194
,614
48,164
,092
61,4
99,860
94,007
,361
113,1
76,93
6
119,70
4,262
Hal 40/46URAIAN BAHAN BANGUNANPROYEK RUMAH TINGGAL TYPE 46/90 M2 (Bpk. REDY)
NO URAIAN PEKERJAAN VOLUME SATUAN SATUAN
I PEKERJAAN PONDASI1 Pasang Bowplank 42.00 m1 Papan cor 0.200 8.40 lbr
Usuk cor 4/6 0.600 25.20 btg Paku 0.100 4.20 kg
2 Urugan Pasir Bawah Pondasi 4.95 m3 Pasir Urug 1.200 5.94 m3 3 Anstamping Batu belah m3 Batu Kali 1.100 0.00 m3
Pasir urug 0.500 0.00 m3 4 Pas Pondasi Batu Kali 1:8 21.75 m3 Batu Kali 1.200 26.10 m3
Semen 2.400 52.20 zag
Pasir 0.760 16.53 m3
II PEKERJAAN BETON BERTULANG1 Pondasi voet plat besar m3 Kericak 0.820 0.00 m3
Pasir 0.490 0.00 m3
Semen 7.896 0.00 zag
Bendrat 2.077 0.00 kg
Paku 2.660 0.00 kg
Papan cor 4.442 0.00 lbr
Besi 11,3 23.126 0.00 btg
Besi 5,6 3.169 0.00 btg 2 Pondasi voet plat kecil m3 Kericak 0.820 0.00 m3
Pasir 0.490 0.00 m3
Semen 7.896 0.00 zag
Bendrat 2.077 0.00 kg
Paku 2.660 0.00 kg
Papan cor 4.442 0.00 lbr
Besi 9,5 13.581 0.00 btg
Besi 4,9 4.167 0.00 btg 3 Sloof praktis 15/20 1.940 m3 Kericak 0.820 1.59 m3
Pasir 0.490 0.95 m3
Semen 7.896 15.32 zag
Bendrat 2.077 4.03 kg
Paku 2.660 5.16 kg
Papan cor 11.108 21.55 lbr
Besi 9,5 11.112 21.56 btg
Besi 4,9 7.500 14.55 btg 4 Sloof struktur m3 Kericak 0.820 0.00 m3
Pasir 0.490 0.00 m3
Semen 7.896 0.00 zag
Bendrat 2.077 0.00 kg
Paku 2.660 0.00 kg
Papan cor 11.108 0.00 lbr
Besi 11,3 11.112 0.00 btg
Besi 5,6 7.112 0.00 btg 5 Kolom Struktur besar m3 Kericak 0.820 0.00 m3
Pasir 0.490 0.00 m3
Semen 7.896 0.00 zag
Bendrat 1.976 0.00 kg
Paku 2.660 0.00 kg
Papan cor 11.108 0.00 lbr
Besi 11,3 14.815 0.00 btg
Besi 5,6 7.831 0.00 btg 6 Kolom Struktur 15/20 m3 Kericak 0.820 0.00 m3
Pasir 0.490 0.00 m3
Semen 7.896 0.00 zag
Bendrat 1.976 0.00 kg
JENIS BAHAN & TNG KERJA
SATUAN BHN
JUMLAH BAHAN
Hal 41/46URAIAN BAHAN BANGUNANPROYEK RUMAH TINGGAL TYPE 46/90 M2 (Bpk. REDY)
NO URAIAN PEKERJAAN VOLUME SATUAN SATUAN
I PEKERJAAN PONDASI
JENIS BAHAN & TNG KERJA
SATUAN BHN
JUMLAH BAHAN
Paku 3.556 0.00 kg
Papan cor 11.108 0.00 lbr
Besi 9,5 11.112 0.00 btg
Besi 4,9 7.500 0.00 btg 7 Tiang Praktis 15/15 2.160 m3 Kericak 0.820 1.77 m3
Pasir 0.490 1.06 m3
Semen 7.896 17.06 zag
Bendrat 1.976 4.27 kg
Paku 3.556 7.68 kg
Papan cor 14.809 31.99 lbr
Besi 8,3 14.815 32.00 btg
Besi 4,9 8.150 17.60 btg 8 Balok Struktur m3 Kericak 0.820 0.00 m3
Pasir 0.490 0.00 m3
Semen 7.896 0.00 zag
Bendrat 1.976 0.00 kg
Paku 3.556 0.00 kg
Usuk 4/6 11.111 0.00 btg
Papan cor 9.854 0.00 lbr
Besi 11,3 12.963 0.00 btg
Besi 5,6 7.831 0.00 btg 9 Ring balk 2.370 m3 Kericak 0.820 1.94 m3
Pasir 0.490 1.16 m3
Semen 7.896 18.71 zag
Bendrat 1.976 4.68 kg
Paku 3.556 8.43 kg
Usuk 4/6 8.333 19.75 btg
Papan cor 14.809 35.10 lbr
Besi 9,5 11.112 26.34 btg
Besi 4,9 7.500 17.78 btg 10 Balok Latey 0.400 m3 Kericak 0.820 0.33 m3
Pasir 0.490 0.20 m3
Semen 7.896 3.16 zag
Bendrat 1.976 0.79 kg
Paku 3.556 1.42 kg
Usuk 4/6 2.833 1.13 btg
Papan cor 14.809 5.92 lbr
Besi 8,3 14.815 5.93 btg
Besi 4,9 8.149 3.26 btg 11 Plat lantai beton t=12cm m3 Kericak 0.820 0.00 m3
Pasir 0.490 0.00 m3
Semen 7.896 0.00 zag
Bendrat 0.780 0.00 kg
Paku 2.000 0.00 kg
Usuk 4/6 8.333 0.00 btg
Papan cor 6.944 0.00 lbr
Besi 9,5 11.112 0.00 btg 12 Plat atap beton t=10cm m3 Kericak 0.820 0.00 m3
Pasir 0.490 0.00 m3
Semen 7.896 0.00 zag
Bendrat 0.780 0.00 kg
Paku 4.000 0.00 kg
Usuk 4/6 3.907 0.00 btg
Papan cor 8.330 0.00 lbr
Besi 8,3 11.112 0.00 btg
Hal 42/46URAIAN BAHAN BANGUNANPROYEK RUMAH TINGGAL TYPE 46/90 M2 (Bpk. REDY)
NO URAIAN PEKERJAAN VOLUME SATUAN SATUAN
I PEKERJAAN PONDASI
JENIS BAHAN & TNG KERJA
SATUAN BHN
JUMLAH BAHAN
13 Plat tangga beton t=12cm m3 Kericak 0.820 0.00 m3
Pasir 0.490 0.00 m3
Semen 7.896 0.00 zag
Bendrat 0.780 0.00 kg
Paku 4.000 0.00 kg
Usuk 4/6 3.907 0.00 btg
Papan cor 6.940 0.00 lbr
Besi 9,5 13.283 0.00 btg 14 Leufel dan Plat Dapur t=8 0.570 m3 Kericak 0.820 0.47 m3
Pasir 0.490 0.28 m3
Semen 7.896 4.50 zag
Bendrat 0.780 0.44 kg
Paku 4.000 2.28 kg
Usuk 4/6 3.907 2.23 btg
Papan cor 8.330 4.75 lbr
Besi 8,3 10.940 6.24 btg 15 Beton Tumbuk m3 Kericak 0.910 0.00 m3
Pasir 0.540 0.00 m3
Semen 5.675 0.00 zag III PEKERJAAN DINDING DAN PLESTERAN
1 Pas. dinding bata ad 1:8 229.97 m2 Batu Bata 77.000 17,707.69 buah
Semen 0.270 62.09 zag
Pasir 0.045 10.35 m3 2 Plesteran Dinding bata ad 1:8 442.62 m2 Semen 0.195 86.31 zag
Pasir 0.027 11.86 m3
IV PEKERJAAN LANTAI1 Rabat Beton Tumbuk 1:3:5 t=5 2.50 m3 Grosok 0.000 0.00 m3
Semen 5.675 14.19 zag 2 Pas. keramik lantai 50/50 ruangan 1:8 m2 Keramik 50/50 4.000 0.00 lbr
Semen 0.203 0.00 zag
Pasir 0.032 0.00 m3 3 Pas. keramik lantai 40/40 ruangan 1:8 41.37 m2 Keramik 40/40 6.250 258.56 lbr
Semen 0.203 8.40 zag
Pasir 0.032 1.33 m3 4 Pas. keramik lantai 33,3/33,3 teras 1:8 5.85 m2 Keramik 33,3/33,3 9.183 53.72 doz
Semen 0.203 1.19 zag
Pasir 0.032 0.19 m3 5 Pas. lantai tangga,teras 30/30 1:8 m2 Keramik 30/30 11.111 0.00 lbr
Semen 0.203 0.00 zag
Pasir 0.032 0.00 m3 6 Pas. keramik lantai 25/25 KM/WC 2.62 m2 Keramik 25/25 16.000 41.92 lbr
Semen 0.203 0.53 zag
Pasir 0.032 0.08 m3 7 Pas. keramik dinding 25/33 KM/WC 10.40 m2 Keramik 25/33 12.121 126.06 doz
Semen 0.203 2.11 zag
Pasir 0.032 0.33 m3 8 Pas. Keramik lantai 20/20 KM/WC m2 Keramik 20/20 25.000 75.00 lbr
Semen 0.203 0.61 zag
Pasir 0.032 0.10 m3 9 Pas. Keramik dinding 20/25 KM/WC m2 Keramik 20/25 20.000 0.00 lbr
Semen 0.203 0.00 zag
Pasir 0.032 0.00 m3 10 Pas. Keramik dinding 20/20 dapur 3.00 m2 Keramik 20/20 25.000 75.00 lbr
Semen 0.203 0.61 zag
Hal 43/46URAIAN BAHAN BANGUNANPROYEK RUMAH TINGGAL TYPE 46/90 M2 (Bpk. REDY)
NO URAIAN PEKERJAAN VOLUME SATUAN SATUAN
I PEKERJAAN PONDASI
JENIS BAHAN & TNG KERJA
SATUAN BHN
JUMLAH BAHAN
Pasir 0.032 0.10 m3 7 Pas. Lis 6/25 KM/WC 5.20 m1 Lis 6/25 4.000 20.80 bh
Semen 0.012 0.06 zag
Pasir 0.002 0.01 m3 7 Pas. Lis 6/20 KM/WC m1 Lis 6/20 5.000 0.00 bh
Semen 0.012 0.00 zag
Pasir 0.002 0.00 m3 11 Pas. Batu alam candi 20/20 m2 Batu alam 20/20 26.250 0.00 lembar
Semen 0.203 0.00 zag
Pasir 0.032 0.00 m3 12 Pas. Batu alam 20x60 m2 Batu alam 20/60 14.375 0.00 lembar
Semen 0.203 0.00 zag
Pasir 0.032 0.00 m3 13 Urugan Pasir Bawah Lantai t=3cm 1.50 m3 Pasir urug 1.200 1.80 m3
V PEKERJAAN ATAP1 Pek gording, nok, jurai m1 Kayu 6/12 x 4m 0.263 0.00 batang
Paku 0.190 0.00 kg 2 Pasang Usuk dan reng m2 Usuk 5/7 x 4m 0.550 0.00 btg
Reng 2/3 x 4m 0.825 0.00 btg
Paku 0.250 0.00 kg 3 Pekerjaan Papan Lisplank & Papan Angin 18.50 m1 Papan 2/20 x 2m 0.263 4.86 lembar
Paku 0.025 0.46 kg 4 Pekerjaan papan talang dan penutup m1 Papan 2/20 x 4m 0.550 0.00 lembar
Seng datar 1.050 0.00 m1 5 Pasang Kerpus genteng Beton 5.90 m1 Kerpus beton 3.675 21.68 buah
Semen 0.200 1.18 zag
Pasir 0.033 0.19 m3 6 Pasang Genteng Beton 64.00 m2 Genteng Beton 10.500 672.00 lembar 7 Gording kanal CNP15 44.60 m1 Kanal C 0.167 7.43 btg
VI PEKERJAAN PLAFOND DAN RANGKA1 Pekerjaan plafond gypsum ruangan 40.25 m2 Jayaboard 1,2x2,4 0.383 15.40 lembar
Rangka Hollow 0.802 32.28 batang
Skrup board 38.000 1,529.50 bh
Compound 0.025 0.99 zag 2 Pekerjaan plafond kalsiboard tritisan 12.77 m2 Kalsiboard 1,2x2,4 0.383 4.89 lembar
Rangka Hollow 0.802 10.24 batang
Skrup board 38.000 485.26 bh
Compound 0.025 0.32 zag VII PEKERJAAN PENGECATAN
1 Cat Tembok Eksterior abu2 mowilex 86.71 m2 Cat Tembok 0.167 14.45 kg
Alkali 0.083 7.22 kg 5 Cat Tembok Interior catylac 144.58 m2 Cat Tembok 0.375 54.22 kg 6 Cat Genteng 64.00 m2 Cat Genteng 0.125 8.00 kg 7 Water proofing m2 Water proofing 0.375 0.00 kg 8 Coating batu alam ex. Sicosol 5.42 m2 Coating batu 0.375 2.03 kg 9 Melamine daun pintu & roster m2 Melamine 0.284 0.00 kg
Thinner 0.200 0.00 kg 10 Cat Plafond 59.04 m2 Cat Tembok 0.250 14.76 kg 11 Cat kayu listplank 4.63 m2 Cat kayu 0.284 1.31 kg
Thinner 0.200 0.93 kg
KEBUTUHAN BAHAN BANGUNAN
PROYEK RUMAH TINGGAL TYPE 46/90 M2 (Bpk. REDY)
NO URAIAN PEKERJAAN PAKU
I PEKERJAAN PONDASI
1 Pasang Bowplank 4.20 25.20 8.40
2 Urugan Pasir Bawah Pondasi 5.94
3 Pasangan Aanstamping - -
4 Pas Pondasi Batu belah 16.53 52.20 26.10
- 16.53 52.20 - 4.20 25.20 8.40 - - - - - 5.94 26.10
II PEKERJAAN BETON BERTULANG
1 Pondasi voet plat besar - - - - - - - -
2 Pondasi voet plat kecil - - - - - - - -
3 Sloof 15/20 1.59 0.95 15.32 4.03 5.16 21.55 21.56 14.55
4 Sloof 15/25 - - - - - - - -
5 Kolom struktur 15/25 - - - - - - - -
6 Kolom struktur 15/20 - - - - - - - -
7 Tiang Praktis 15/15 1.77 1.06 17.06 4.27 7.68 31.99 32.00 17.60
8 Balok beton 15/25 - - - - - - - - -
9 Ringbalk 15/20 1.94 1.16 18.71 4.68 8.43 19.75 35.10 26.34 17.78
10 Balok latey 15/15 0.33 0.20 3.16 0.79 1.42 1.13 5.92 5.93 3.26
11 Plat lantai beton t=12cm - - - - - - - -
12 Plat atap beton t=10cm - - - - - - - -
13 Plat tangga beton t=12cm - - - - - - - -
14 Leufel t=8 0.47 0.28 4.50 0.44 2.28 2.23 4.75 6.24
15 Beton tumbuk - -
6.10 3.65 58.75 14.22 24.97 23.11 99.31 - 47.89 44.16 - 53.19 - -
III PEKERJAAN DINDING DAN PLESTERAN
1 Pas. Dinding bata ad 1:8 10.35 62.09
2 Plesteran dinding ad 1:8 11.86 86.31
- 22.21 148.40 - - - - - - - - - - -
IV PEKERJAAN LANTAI
1 Floor Lantai Btn Tumbuk 1:3:5 14.19
2 Pas. keramik 50/50 - -
3 Pas. Keramik 40/40 1.33 8.40
4 Pas. keramik 33,3/33,3 0.19 1.19
5 Pas. keramik 30/30 - -
6 Pas. keramik 25/25 0.08 0.53
7 Pas. keramik 25/33 0.33 2.11
8 Pas. keramik 20/20 0.10 0.61
9 Pas. keramik 20/25 - -
10 Pas. Lis 6/25 KM/WC 0.01 0.06
11 Pas. Lis 6/20 KM/WC - -
12 Pas. keramik dapur 20/20 0.10 0.61
13 Pas. Batu candi 20/20 - -
14 Pas. Batu andesit 15/30 - -
15 Urugan Pasir Bawah Lantai 1.80
- 2.14 27.70 - - - - - - - - - 1.80 -
V PEKERJAAN ATAP
1 Pek gording, nok & jurai -
2 Pas. Usuk dan reng -
3 Pek. Ppn. Angin & Listplank 0.46
4 Pek. Talang dan Penutup
5 Pas. Kerpus genteng beton 0.19 1.18
6 Pas. Genteng Beton
7 Gording kanal CNP15
- 0.19 1.18 - 0.46 - - - - - - - - -
SATUAN m3 m3 zag kg kg btng lbr btg btg btg btg btg m3 m3
TOTAL BAHAN 6.1 44.7 288.2 14.2 29.6 48.3 107.7 - 47.9 44.2 - 53.2 7.7 26.1
KERICAK PASIR PASANG
SEMEN 40 KG
BENDRA
T
USUK 4/6
PAPAN COR
BESI 11,3
BESI 9,5 BESI 8,3 BESI 5,6 BESI 4,9 PASIR URUG
BATU BELAH
Hal 45 / 46
REKAPITULASI KEBUTUHAN BAHANPROYEK RUMAH TINGGAL TYPE 46/90 M2 (Bpk. REDY)
NO. B A H A N / M A T E R I A L SAT JUMLAH HARGA SATUAN HARGA TOTAL
1 Semen PC 40 kg zak 288.23 Rp 42,000.00 Rp 12,105,521.40
2 Pasir Pasang 44.72 Rp 130,000.00 Rp 5,813,323.10
3 Pasir Urug 7.74 Rp 90,000.00 Rp 696,600.00
4 Batu Belah 26.10 Rp 100,000.00 Rp 2,610,000.00
5 Kericak 6.10 Rp 170,000.00 Rp 1,037,136.00
6 Bendrat kg 14.22 Rp 14,000.00 Rp 199,019.24
7 Paku kg 29.63 Rp 15,000.00 Rp 444,480.12
8 Usuk 4/6 (Cor) btg 48.31 Rp 5,000.00 Rp 241,547.60
9 Papan cor lbr 107.71 Rp 6,000.00 Rp 646,235.94
10 Besi Ø 12 (11,3) - 12 btg - Rp 86,080.80 Rp -
11 Besi Ø 10 (9,5) - 12 btg 47.89 Rp 59,966.40 Rp 2,871,954.00
12 Besi Ø 9 (8,3) - 12 btg 44.16 Rp 37,720.80 Rp 1,665,833.51
13 Besi Ø 6 (5,6) - 12 btg - Rp 22,994.40 Rp -
14 Besi Ø 5 (4,9) - 12 btg 53.19 Rp 15,678.00 Rp 833,890.87
15 Batu Bata bh 17,707.69 Rp 400.00 Rp 7,083,076.00
16 Genteng Beton FLAT lbr 672.00 Rp 3,500.00 Rp 2,352,000.00
17 Kerpus Genteng Beton bh 21.68 Rp 4,500.00 Rp 97,571.25
18 Canal C15 btg 7.43 Rp 175,500.00 Rp 1,304,550.00
19 Seng datar - Rp 25,000.00 Rp -
20 Papan GRC 2 m lbr 4.86 Rp 45,000.00 Rp 218,531.25
21 Papan kayu 2/20 lbr - Rp 110,000.00 Rp -
22 Kayu Balok 6/12 btg - Rp -
23 Kayu Usuk 5/7 btg - Rp -
24 Kayu Reng 2/3 btg - Rp -
25 Cat Exterior mowilex kg 14.45 Rp 63,000.00 Rp 910,637.09
29 Cat Alkali kg 7.22 Rp 34,000.00 Rp 245,580.06
30 Cat Interior catylac kg 54.22 Rp 15,000.00 Rp 813,262.50
31 Cat plafond maxilite kg 14.76 Rp 9,000.00 Rp 132,840.00
32 Cat Genteng kg 8.00 Rp 25,000.00 Rp 200,000.00
33 Sicosol kg 2.03 Rp 50,700.00 Rp 103,047.75
34 Water proofing kg - Rp 40,000.00 Rp -
35 Cat Kayu kg 1.31 Rp 35,000.00 Rp 45,972.50
36 Melamine kg - Rp 45,000.00 Rp -
37 Thinner kg 0.93 Rp 18,000.00 Rp 16,650.00
38 Scrup board bh 2,014.76 Rp 50.00 Rp 100,738.00
39 Compound zag 1.31 Rp 2,000.00 Rp 2,619.19
40 Gypsum Board lbr 15.40 Rp 45,000.00 Rp 693,165.38
41 Kalsiboard lbr 4.89 Rp 45,000.00 Rp 219,918.56
42 List Gypsum Ruangan m1 Rp 12,000.00 Rp -
43 Besi Hollow 2/4 btg 42.52 Rp 14,000.00 Rp 595,308.56
44 Batu alam - Rp -
45 Batu andesit 15/30 - Rp 120,000.00 Rp -
m3
m3
m3
m3
m1
m2
m2
Hal 46 / 46
REKAPITULASI KEBUTUHAN BAHANPROYEK RUMAH TINGGAL TYPE 46/90 M2 (Bpk. REDY)
NO. B A H A N / M A T E R I A L SAT JUMLAH HARGA SATUAN HARGA TOTAL
46 Keramik 50/50 platinum dos - Rp -
47 Keramik 40/40 asia tile dos 43.09 Rp 32,500.00 Rp 1,400,546.88
48 Keramik 33,3/33,3 platinum dos 5.97 Rp 45,000.00 Rp 268,595.04
49 Keramik 30/30 asia tile dos - Rp 35,000.00 Rp -
50 Keramik Lantai 25/25 roman dos 2.62 Rp 46,000.00 Rp 120,520.00
51 Keramik Lantai 25/33,3 platinum dos 10.51 Rp 41,500.00 Rp 435,959.60
52 Keramik Lantai 20/20 wc asia tile dos 3.00 Rp 32,000.00 Rp 96,000.00
53 Keramik Dinding 20/25 asia tile dos - Rp 35,000.00 Rp -
54 Keramik Dapur 20/20 asia tile dos 3.00 Rp 32,000.00 Rp 96,000.00
55 List keramik 6/25 platinum bh 20.80 Rp 16,000.00 Rp 332,800.00
56 List Keramik 6/20 asia tile bh - Rp 6,000.00 Rp -
JUMLAH ###