LAPORAN HASIL LAPORAN HASIL WORKSHOP WORKSHOP EMONITORING EMONITORING APBN APBNP& P& KONSOLIDASI KONSOLIDASI DATA PELAPORAN DATA PELAPORAN PELAKSANAAN ANGGARAN PELAKSANAAN ANGGARAN T.A. 2013 T.A. 2013 KEMENTERIAN PEKERJAAN UMUM KEMENTERIAN PEKERJAAN UMUM SUBDIT INFOKOM SUBDIT INFOKOM DIREKTORAT BINA PROGRAM DIREKTORAT BINA PROGRAM

Transcript of LAPORAN HASIL WORKSHOP …103.12.84.59/files/LAPORANAPBNP.pdf · VERIFIKASI DATA DIPA PER SATUAN...

LAPORAN HASIL LAPORAN HASIL WORKSHOP WORKSHOP EMONITORINGEMONITORING APBNAPBN‐‐P &P &KONSOLIDASI KONSOLIDASI DATA PELAPORAN DATA PELAPORAN PELAKSANAAN ANGGARANPELAKSANAAN ANGGARAN T.A.  2013T.A.  2013KEMENTERIAN PEKERJAAN UMUMKEMENTERIAN PEKERJAAN UMUM

SUBDIT INFOKOMSUBDIT INFOKOMDIREKTORAT BINA PROGRAMDIREKTORAT BINA PROGRAM

PAGU/ ALOKASI T.A. 2013

KEMENTERIAN PEKERJAAN UMUM

Status  20 september 2013

KEMENTERIAN PEKERJAAN UMUMDIREKTORAT  JENDERAL BINA  MARGA

VERIFIKASI DATA DIPA PER SATUAN KERJA TA 2013

KEMENTERIAN PEKERJAAN UMUM

NoUnit 

Organisasi 

DIPA Awal  Dokumen DIPA (Revisi)  Pagu e‐Monitoring  Selisih

RPM PLN TOTAL RPM PLN TOTAL RPM PLN TOTAL RPM PLN TOTAL

1SETJEN 661 083 171 0 661 083 171 715 897 061 0 715 897 061 715 897 061 0 715 897 061 0 0 01SETJEN 661.083.171 0 661.083.171 715.897.061 0 715.897.061 715.897.061 0 715.897.061 0 0 0

2ITJEN 126.233.000 0 126.233.000 126.233.000 0 126.233.000 126.233.000 0 126.233.000 0 0 0

3DITJEN TARU 801.749.900 0 801.749.900 774.836.900 0 774.836.900 773.291.100 0 773.291.100 1.545.800 0 1.545.800

4DITJEN SDA 17.102.718.560 2.440.189.537 19.542.908.09619.054.845.0

482.405.802.02

621.460.647.0

74 19.053.840.890 2.417.493.468 21.471.334.358 1.004.158

‐11.691.44

2 ‐10.687.284

34 357 657 3 3 132 286 68 37 489 943 95DITJEN BM 36.078.528.169 2.755.003.027 38.833.531.196

34.357.657.311

3.132.286.68237.489.943.9

93 34.683.836.464 3.132.286.682 37.816.123.146 ‐326.179.153 0 ‐326.179.153

6DITJEN CK 14.598.054.593 2.620.721.305 17.218.775.89818.909.600.8

942.636.436.17

721.546.037.0

71 18.243.811.397 2.623.456.567 20.867.267.964 665.789.49712.979.61

1 678.769.108

7BALITBANG 443.206.185 16.104.003 459.310.187 427.113.185 13.332.002 440.445.187 427.113.185 13.332.002 440.445.187 0 0 0

8BP KONSTRUKSI 334.426.120 0 334.426.120 309.426.120 0 309.426.120 309.426.120 0 309.426.120 0 0 0

TOTAL 70.145.999.697 7.832.017.871 77.978.017.56874.675.609.5

198.187.856.88

882.863.466.4

06 74.333.449.217 8.186.568.719 82.520.017.936 ‐342.160.302 ‐1.288.169 ‐343.448.471

Jenis Pagu

Pagu APBN (Awal)Pagu Revisi

PenghematanPagu APBN‐P Pagu di E'mon Selisih

( Rp ) ( Rp ) ( Rp ) ( Rp ) ( Rp )( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )

RPM36,078,528,169 33,870,424,169

35,457,924,169 34,743,996,454 713,927,715

PLN2,755,003,027 3,167,286,682

3,238,691,020 3,132,286,682 106,404,338

TOTAL

38,833,531,196 37,037,710,851 38,696,615,189 37,876,283,136 820,332,053

TOTAL

No Balai

PAGU APBN‐P 2013 PAGU e-Monitoring SELISIH / BLM DIINPUT(Rp Ribu) (Rp Ribu) (Rp Ribu)

RPM PLN TOTAL RPM PLN TOTAL RPM PLN TOTAL

1BALAI BESAR I MEDAN 22,500,000 0 22,500,000 2,537,091,849 427,498,640 2,964,590,489 -2,514,591,849 -427,498,640 -2,942,090,489

2BALAI BESAR II PADANG 0 22,251,368 22,251,368 2,897,889,881 97,233,598 2,995,123,479 -2,897,889,881 -74,982,230 -2,972,872,111

3BALAI BESAR III PALEMBANG

0 0 0 2,024,728,421 100,379,668 2,125,108,089 -2,024,728,421 -100,379,668 -2,125,108,089

4BALAI BESAR IV JAKARTA 0 0 0 3,032,653,154 1,420,177,247 4,452,830,401 -3,032,653,154 -1,420,177,247 -4,452,830,401

BALAI BESAR V 444 000 000 0 444 000 000 3 3 64 404 1 2 8 9 49 3 30 2 1 35BALAI BESAR V SURABAYA

444,000,000 0 444,000,000 3,377,645,404 152,879,749 3,530,525,153 -2,933,645,404 -152,879,749 -3,086,525,153

6BALAI BESAR VI MAKASSAR

0 0 0 3,004,394,334 181,235,000 3,185,629,334 -3,004,394,334 -181,235,000 -3,185,629,334

7BALAI BESAR VII BANJARMASIN

41,000,000 49,152,970 90,152,970 5,138,735,059 662,097,000 5,800,832,059 -5,097,735,059 -612,944,030 -5,710,679,089

8BALAI IX AMBON 0 0 0 1,635,836,008 0 1,635,836,008 -1,635,836,008 0 -1,635,836,008

9BALAI VIII DENPASAR 230,000,000 0 230,000,000 2,586,371,007 30,973,000 2,617,344,007 -2,356,371,007 -30,973,000 -2,387,344,007

10BALAI X JAYAPURA 600,000,000 0 600,000,000 4,950,888,136 0 4,950,888,136 -4,350,888,136 0 -4,350,888,13611BALAI XI MANADO 250,000,000 0 250,000,000 1,863,173,115 5,000,000 1,868,173,115 -1,613,173,115 -5,000,000 -1,618,173,11512PUSAT 0 0 0 2,053,355,814 54,812,780 2,108,168,594 -2,053,355,814 -54,812,780 -2,108,168,594

TOTAL 1,587,500,000 71,404,338 1,658,904,338 35,102,762,182 3,132,286,682 38,235,048,864 -33,515,262,182 -3,060,882,344 -36,576,144,526

VERIFIKASI DATA DIPA PER SATUAN KERJA TA 2013BALAI BESAR PELAKSANAAN JALAN NASIONAL I MEDANBALAI BESAR PELAKSANAAN JALAN NASIONAL I MEDAN

KEMENTERIAN PEKERJAAN UMUM

No Nama Satuan Kerja

DIPA Awal (APBN) Dokumen DIPA (Revisi) Pagu e-Monitoring Selisih

RPM PLN TOTAL RPM PLN TOTAL RPM PLN TOTAL RPM PLN TOTAL

1

DINAS BINA MARGA DAN CIPTA KARYA PROVINSI NAD 55,223,520 400,000 55,623,520 49,303,377 400,000 49,703,377 49,303,377 400,000 49,703,377 0 0 0DINAS JALAN DAN

2

DINAS JALAN DAN JEMBATAN PROV. SUMATERA UTARA 62,353,344 0 62,353,344 62,353,344 0 62,353,344 62,353,344 0 62,353,344 0 0 0

3

BALAI BESAR PELAKSANAAN JALAN NASIONAL I (NAD,SUMUT) DI MEDAN 81,017,342 18,881,000 99,898,342 64,284,348 18,881,000 83,165,348 64,284,348 18,881,000 83,165,348 0 0 0PERENCANAAN DAN PENGAWASAN JALAN

4

PENGAWASAN JALAN NASIONAL PROVINSI SUMATERA UTARA 63,822,532 0 63,822,532 63,822,532 0 63,822,532 60,595,573 0 60,595,573 3,226,959 0 3,226,959

5

PELAKSANAAN JALAN NASIONAL METROPOLITAN MEDAN 350,091,387 0 350,091,387 350,091,387 0 350,091,387 334,074,375 0 334,074,375 16,017,012 0 16,017,012

6

PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI ACEH 532 676 905 35 052 897 567 729 802 475 058 854 158 933 640 633 992 494 475 058 854 158 933 640 633 992 494 0 0 06PROVINSI ACEH 532,676,905 35,052,897 567,729,802 475,058,854 158,933,640 633,992,494 475,058,854 158,933,640 633,992,494 0 0 0

7

PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI ACEH 377,505,244 0 377,505,244 345,030,662 0 345,030,662 345,030,662 0 345,030,662 0 0 0

8

PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI SUMATERA UTARA 631,180,498 0 631,180,498 587,386,314 0 587,386,314 587,386,314 0 587,386,314 0 0 0PELAKSANAAN JALAN

9

PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI SUMATERA UTARA 462,193,695 9,284,000 471,477,695 423,857,165 9,284,000 433,141,165 423,857,165 9,284,000 433,141,165 0 0 0

10

PELAKSANAAN JALAN BEBAS HAMBATAN MEDAN ‐ KUALANAMU 12,656,821 240,000,000 252,656,821 12,656,821 240,000,000 252,656,821 12,656,821 240,000,000 252,656,821 0 0 0

TOTAL 2 628 721 288 303 617 8972,932,339,18

52,433,844,80

4 427 498 640 2 861 343 444 2 414 600 833 427 498 640 2 842 099 473 19 243 971 0 19 243 971TOTAL 2,628,721,288 303,617,897 5 4 427,498,640 2,861,343,444 2,414,600,833 427,498,640 2,842,099,473 19,243,971 0 19,243,971

VERIFIKASI DATA DIPA PER SATUAN KERJA TA 2013

KEMENTERIAN PEKERJAAN UMUM

No Nama Satuan Kerja

DIPA Awal (APBN) Dokumen DIPA (Revisi) Pagu e-Monitoring Selisih

RPM PLN TOTAL RPM PLN TOTAL RPM PLN TOTAL RPM PLN TOTALNo Nama Satuan Kerja RPM PLN TOTAL RPM PLN TOTAL RPM PLN TOTAL RPM PLN TOTAL

11DINAS PRASARANA JALAN PROVINSI SUMATERA BARAT 43,371,606 0 43,371,606 43,371,606 0 43,371,606 42,562,258 0 42,562,258 809,348 0 809,348

12DINAS PEKERJAAN UMUM PROV. RIAU 11,784,510 0 11,784,510 11,784,510 0 11,784,510 11,784,510 0 11,784,510 0 0 0

13DINAS PEKERJAAN UMUM PROV. JAMBI 36,495,800 0 36,495,800 36,495,800 0 36,495,800 36,495,800 0 36,495,800 0 0 0

14DINAS PEKERJAAN UMUM PROVINSI KEPULAUAN RIAU 6 734 514 0 6 734 514 6 734 514 0 6 734 514 6 734 514 0 6 734 514 0 0 014PROVINSI KEPULAUAN RIAU 6,734,514 0 6,734,514 6,734,514 0 6,734,514 6,734,514 0 6,734,514 0 0 0

15

BALAI BESAR PELAKSANAAN JALAN NASIONAL II (SUMBAR, JAMBI, RIAU, KEP. RIAU) DI PADANG 67,575,583 12,800,000 80,375,583 67,575,583 12,800,000 80,375,583 63,595,276 12,800,000 76,395,2763,980,307 03,980,307

16

PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI SUMATERA BARAT 43,292,434 0 43,292,434 43,292,434 0 43,292,434 43,292,434 0 43,292,434 0 0 0PERENCANAAN DAN

17

PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI RIAU 47,295,035 0 47,295,035 44,563,778 0 44,563,778 44,563,778 0 44,563,778 0 0 0

18

PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI JAMBI 27,265,888 0 27,265,888 25,790,749 0 25,790,749 25,790,749 0 25,790,749 0 0 0

19PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI SUMBAR

550,298,023

151,877,000 702,175,023 486,915,530 51,955,575 538,871,105 486,915,530 51,955,575 538,871,105 0 0 0

PELAKSANAAN JALAN NASIONAL 416 524 4220

PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI SUMBAR

416,524,421 23,215,000 439,739,421 390,346,506 18,943,023 409,289,529 390,346,506 18,943,023 409,289,529 0 0 0

21PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI RIAU

483,119,986 0 483,119,986 457,882,631 0 457,882,631 457,882,631 0 457,882,631 0 0 0

22PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI RIAU

411,258,919 0 411,258,919 397,467,537 0 397,467,537 397,467,537 0 397,467,537 0 0 0

23

PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI KEPULAUAN RIAU

376,383,966 0 376 383 966 348 111 966 0 348 111 966 348 111 966 0 348 111 966 0 0 023KEPULAUAN RIAU 6 0 376,383,966 348,111,966 0 348,111,966 348,111,966 0 348,111,966 0 0 0

24PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI JAMBI

224,966,418 13,535,000 238,501,418 213,061,569 13,535,000 226,596,569 213,061,569 13,535,000 226,596,569 0 0 0

25PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI JAMBI

332,572,130 0 332,572,130 310,488,401 0 310,488,401 310,488,401 0 310,488,401 0 0 0

26

PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI KEP. RIAU 18,796,422 0 18,796,422 18,796,422 0 18,796,422 18,796,422 0 18,796,422 0 0 0

3 097 735 201 427 00 3 299 162 65TOTAL

3,097,735,655

201,427,000

3,299,162,655 2,902,679,536 97,233,598 2,999,913,134 2,897,889,881 97,233,598 2,995,123,4794,789,655 04,789,655

VERIFIKASI DATA DIPA PER SATUAN KERJA TA 2013KEMENTERIAN PEKERJAAN UMUM

No Nama Satuan Kerja

DIPA Awal (APBN) Dokumen DIPA (Revisi) Pagu e-Monitoring Selisih

RPM PLN TOTAL RPM PLN TOTAL RPM PLN TOTAL RPMPLN

TOTAL

27DINAS PU BINA MARGA PROV. SUMSEL 21,186,500 0 21,186,500 19,959,343 0 19,959,343 19,959,343 0 19,959,343 0 0 0

28DINAS BINA MARGA PROV. LAMPUNG 19,823,015 0 19,823,015 19,099,405 0 19,099,405 19,099,405 0 19,099,405 0 0 0

29DINAS PEKERJAAN UMUM PROVINSI BENGKULU 92,268,045 0 92,268,045 88,061,194 0 88,061,194 88,061,194 0 88,061,194 0 0 0DINAS PEKERJAAN UMUM PROVINSI KEPULAUAN BANGKA 

30BELITUNG 24,941,427 0 24,941,427 24,373,319 0 24,373,319 24,373,319 0 24,373,319 0 0 0

31

BALAI BESAR PELAKSANAAN JALAN NASIONAL III (BENGKULU, LAMPUNG, SUMSEL, DAN BABEL) DI PALEMBANG 98,361,892 0 98,361,892 71,958,252 0 71,958,252 71,958,252 0 71,958,252 0 0 0

32

PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI SUMATERA SELATAN 32,320,177 0 32,320,177 30,174,839 0 30,174,839 30,174,839 0 30,174,839 0 0 0

33

PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI BENGKULU 17,368,646 0 17,368,646 15,742,646 0 15,742,646 15,742,646 0 15,742,646 0 0 0

34

PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI LAMPUNG 26,803,555 0 26,803,555 24,296,438 0 24,296,438 24,296,438 0 24,296,438 0 0 0PERENCANAAN DAN PENGAWASAN JALAN NASIONAL 

35PROVINSI BANGKA BLITUNG 11,269,554 0 11,269,554 10,521,596 0 10,521,596 10,521,596 0 10,521,596 0 0 0

36PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI BENGKULU 111,329,550 82,954,000 194,283,550 79,218,589 25,187,196 104,405,785 79,218,589 25,187,196 104,405,785 0 0 0

37PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI BENGKULU 167,129,138 9,529,000 176,658,138 150,890,627 9,529,000 160,419,627 150,890,627 9,529,000 160,419,627 0 0 0

38PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI SUMSEL 265,188,166 0 265,188,166 252,819,165 0 252,819,165 252,819,165 0 252,819,165 0 0 0PELAKSANAAN JALAN NASIONAL 

39WILAYAH II PROVINSI SUMSEL 151,236,651 0 151,236,651 151,865,823 0 151,865,823 151,865,823 0 151,865,823 0 0 0

40PELAKSANAAN JALAN METROPOLITAN PALEMBANG 245,274,592 1,400,000 246,674,592 241,540,791 1,400,000 242,940,791 241,540,791 1,400,000 242,940,791 0 0 0

41PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI BABEL 120,286,020 0 120,286,020 117,623,261 0 117,623,261 117,623,261 0 117,623,261 0 0 0

42PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI BABEL 131,101,781 0 131,101,781 127,230,034 0 127,230,034 127,230,034 0 127,230,034 0 0 0PELAKSANAAN JALAN NASIONAL 

43WILAYAH I PROVINSI LAMPUNG 325,622,766 45,458,000 371,080,766 305,710,300 45,458,000 351,168,300 305,710,300 45,458,000 351,168,300 0 0 0

44PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI LAMPUNG 345,930,049 59,192,000 405,122,049 287,141,533 18,805,472 305,947,005 287,141,533 18,805,472 305,947,005 0 0 0

TOTAL 2,207,441,524 198,533,0002,405,974,524 2,018,227,155 100,379,668 2,118,606,823 2,018,227,155 100,379,668 2,118,606,823 0 0 0

VERIFIKASI DATA DIPA PER SATUAN KERJA TA 2013

KEMENTERIAN PEKERJAAN UMUM

No Nama Satuan Kerja

DIPA Awal (APBN) Dokumen DIPA (Revisi) Pagu e-Monitoring Selisih

RPM PLN TOTAL RPM PLN TOTAL RPM PLN TOTAL RPM PLN TOTALDINAS BINA MARGA PROV 81 823 06 81 823 0 8 848 7 8 848 7

45DINAS BINA MARGA PROV. JAWA BARAT 90,671,846 0 90,671,846 90,671,846 0 90,671,846

81,823,061 0

81,823,061

8,848,785 0

8,848,785

46DINAS BINA MARGA DAN TATA RUANG PROVINSI BANTEN 38,579,300 0 38,579,300 36,992,645 0 36,992,645

36,992,645 0

36,992,645 0 0 0

47PELAKSANAAN JALAN BEBAS HAMBATAN TANJUNG PRIOK 124,575,601 451,940,247 576,515,848 124,575,601 451,940,247 576,515,848

111,780,310

925,713,247

1,037,493,557

12,795,291

-473,773

,000

-460,977

,709BALAI BESAR PELAKSANAAN JALAN NASIONAL IV (BANTEN 125 991 5 100 000 225 991

48JALAN NASIONAL IV (BANTEN, DKI, DAN JABAR) DI DKI JAKARTA 125,991,549 100,000,000 225,991,549 125,991,549 100,000,000 225,991,549

125,991,549

100,000,000

225,991,549 0 0 0

49

PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI BANTEN 35,886,682 0 35,886,682 35,886,682 0 35,886,682

35,886,682 0

35,886,682 0 0 0

50

PERENCANAAN DAN PENGAWASAN JALAN NASIONAL KOTA METROPOLITAN JAKARTA 30,993,607 0 30,993,607 30,993,607 0 30,993,607

26,838,290 0

26,838,290

4,155,317 0

4,155,317

PELAKSANAAN JALAN NASIONAL 97 176 84 97 176 851

PELAKSANAAN JALAN NASIONAL METROPOLITAN BANDUNG 97,378,929 0 97,378,929 97,176,847 0 97,176,847

97,176,847 0

97,176,847 0 0 0

52PELAKSANAAN JALAN NASIONAL METROPOLITAN I JAKARTA 253,392,670 0 253,392,670 210,283,984 0 210,283,984

210,283,984 0

210,283,984 0 0 0

53PELAKSANAAN JALAN NASIONAL METROPOLITAN III JAKARTA 320,168,900 0 320,168,900 275,789,205 0 275,789,205

275,789,205 0

275,789,205 0 0 0

54PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI BANTEN 153,510,114 0 153,510,114 152,964,217 0 152,964,217

152,964,217 0

152,964,217 0 0 0

PELAKSANAAN JALAN NASIONAL 233 602 1 14 464 0 248 06655

PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI BANTEN 241,983,208 14,464,000 256,447,208 233,602,171 14,464,000 248,066,171

233,602,171

14,464,000

248,066,171 0 0 0

56PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI JABAR 371,814,425 10,000 371,824,425 371,814,425 10,000 371,824,425

371,814,425 10,000

371,824,425 0 0 0

57PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI JABAR 1,019,885,148 0 1,019,885,148 1,019,885,148 0 1,019,885,148

850,916,024 0

850,916,024

168,969,124 0

168,969,124

58PELAKSANAAN JALAN BEBAS HAMBATAN CISUMDAWU 11,772,800 479,990,000 491,762,800 11,772,800 379,990,000 391,762,800

11,772,800

379,990,000

391,762,800 0 0 0

PELAKSANAAN JALAN NASIONAL 274 313 1 274 31359

PELAKSANAAN JALAN NASIONAL METROPOLITAN II JAKARTA 306,738,765 0 306,738,765 274,313,180 0 274,313,180

274,313,180 0

274,313,180 0 0 0

60UNIT PERALATAN DAN PENGUJIAN CIKAMPEK 10,242,750 0 10,242,750 10,242,750 0 10,242,750

10,242,750 0

10,242,750 0 0 0

TOTAL 3,233,586,294 1,046,404,247 4,279,990,541 3,102,956,657 946,404,247 4,049,360,9042,908,188,

1401,420,17

7,2474,328,36

5,387194,768

,517

-473,773

,000

-279,004

,483

VERIFIKASI DATA DIPA PER SATUAN KERJA TA 2013

KEMENTERIAN PEKERJAAN UMUM

No Nama Satuan Kerja DIPA Awal (APBN) Dokumen DIPA (Revisi) Pagu e-Monitoring Selisih

RPM PLN TOTAL RPM PLN TOTAL RPM PLN TOTAL RPM PLN TOTALj

61DINAS BINA MARGA PROV. JAWA TENGAH 90,829,202 0 90,829,202 88,738,357 0 88,738,357

88,738,357 0

88,738,357 0 0 0

62

DINAS PEKERJAAN UMUM, PERUMAHAN DAN ENERGI SUMBER DAYA MINERAL PROVINSI D.I. YOGYAKARTA 29,443,460 0 29,443,460 29,161,905 0 29,161,905

29,161,905 0

29,161,905 0 0 0

63DINAS BINA MARGA PROV. JAWA TIMUR 90,000,000 0 90,000,000 86,914,889 0 86,914,889

86,914,889 0

86,914,889 0 0 0

64PELAKSANAAN JALAN BEBAS HAMBATAN TANJUNG PRIOK 124,575,601 451,940,247 576,515,848 124,575,601 451,940,247 576,515,848

111,780,310

925,713,247

1,037,493,557

12,795,291

-473,77

3,000

-460,97

7,709

65BALAI BESAR PELAKSANAAN JALAN NASIONAL I (NAD,SUMUT) DI MEDAN 81,017,342 18,881,000 99,898,342 64,284,348 18,881,000 83,165,348

64,284,348

18,881,000

83,165,348 0 0 0

66

BALAI BESAR PELAKSANAAN JALAN NASIONAL V (JATENG, DIY, JATIM) DI SURABAYA 152,736,436 12,920,000 165,656,436 111,132,598 12,920,000 124,052,598

111,132,598

12,920,000

124,052,598 0 0 0

67

PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI JAWATIMUR 40,314,103 0 40,314,103 40,314,103 0 40,314,103

40,314,103 0

40,314,103 0 0 0

68PELAKSANAAN JALAN NASIONAL WILAYAH II PROPINSI JAWA TENGAH 490,964,680 18,066,103 509,030,783 476,196,436 18,066,103 494,262,539

476,196,436

18,066,103

494,262,539 0 0 0

69

PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI JAWA TENGAH 41,557,166 0 41,557,166 39,199,314 0 39,199,314

39,199,314 0

39,199,314 0 0 0

70

PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI DI. JOGYAKARTA 12,960,682 0 12,960,682 12,597,307 0 12,597,307

12,597,307 0

12,597,307 0 0 0

71PELAKSANAAN JALAN NASIONAL METROPOLITAN SEMARANG 315,936,517 0 315,936,517 307,578,639 0 307,578,639

307,578,639 0

307,578,639 0 0 0

72PELAKSANAAN JALAN NASIONAL METROPOLITAN I SURABAYA 142,340,558 0 142,340,558 141,852,319 0 141,852,319

141,852,319 0

141,852,319 0 0 0

PELAKSANAAN JALAN NASIONAL  459,61166,084,0525,695,73WILAYAH I PROVINSI JATENG 535,088,342 66,084,000 601,172,342 459,611,932 66,084,000 525,695,932 ,932 00 932 0 0 0

74

PELAKSANAAN JALAN NASIONAL WILAYAH PROVINSI D.I. YOGYAKARTA 321,904,042 0 321,904,042 317,246,900 0 317,246,900

317,246,900 0

317,246,900 0 0 0

75PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI JATIM 180,661,220 37,011,640 217,672,860 180,661,220 37,011,640 217,672,860

168,453,600

54,238,286

222,691,886

12,207,620

-17,226,

646

-5,019,0

26PELAKSANAAN JALAN NASIONAL  278,378 278,378,

76WILAYAH II PROVINSI JATIM 279,141,589 0 279,141,589 278,378,104 0 278,378,104 ,104 0 104 0 0 0

77PELAKSANAAN JALAN NASIONAL METROPOLITAN II SURABAYA 330,696,093 771,360 331,467,453 328,090,012 771,360 328,861,372

328,090,012 771,360

328,861,372 0 0 0

TOTAL 3,260,167,033 605,674,350 3,865,841,383 3,086,533,984 605,674,3503,692,208,33

43,061,531,073

1,096,673,996

4,158,205,069

25,002,911

-490,99

9,646

-465,99

6,735

VERIFIKASI DATA DIPA PER SATUAN KERJA TA 2013

KEMENTERIAN PEKERJAAN UMUM

No Nama Satuan Kerja DIPA Awal (APBN) Dokumen DIPA (Revisi) Pagu e-Monitoring Selisih

RPM PLN TOTAL RPM PLN TOTAL RPM PLN TOTAL RPM PLN TOTAL

78

DINAS PERMUKIMAN DAN PRASARANA WILAYAH PROV. SULAWESI TENGAH 19 122 722 0 19 122 722 19 122 722 0

19,122,722

19,122722 0 19 122 722 0 0 078SULAWESI TENGAH 19,122,722 0 19,122,722 19,122,722 0 722 ,722 0 19,122,722 0 0 0

79DINAS PEKERJAAN UMUM PROV. SULAWESI SELATAN 9,328,516 0 9,328,516 9,328,516 0

9,328,516

9,328,516 0 9,328,516 0 0 0

80SKPD DINAS PEKERJAAN UMUM PROV. SULAWESI TENGGARA 6,564,622 0 6,564,622 6,564,622 0

6,564,622

6,564,622 0 6,564,622 0 0 0

81

BALAI BESAR PELAKSANAAN JALAN NASIONAL VI (SULSEL, SULBAR, SULTRA, SULTENG) DI MAKASAR 104,600,322 0 104,600,322 82,696,389 0

82,696,389

82,696,389 0 82,696,389 0 0 0

PERENCANAAN DAN

82

PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI SULAWESI SELATAN 36,957,455 0 36,957,455 33,575,967 0

33,575,967

33,575,967 0 33,575,967 0 0 0

83

PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI SULAWESI BARAT 19,269,594 0 19,269,594 19,269,594 0

19,269,594

19,269,594 0 19,269,594 0 0 0

84

PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI SULAWESI TENGAH 38 173 065 0 38 173 065 35 849 395 0

35,849,395

35,849395 0 35 849 395 0 0 084PROVINSI SULAWESI TENGAH 38,173,065 0 38,173,065 35,849,395 0 395 ,395 0 35,849,395 0 0 0

85

PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI SULAWESI TENGGARA 40,194,850 0 40,194,850 37,917,501 0

37,917,501

37,917,501 0 37,917,501 0 0 0

86PELAKSANAAN JALAN NASIONAL METROPOLITAN MAKASAR 145,751,127 0 145,751,127 143,612,064 0

143,612,064

143,612,064 0 143,612,064 0 0 0

87PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI SULTENG 271,284,026 100,000 271,384,026 271,284,026

100,000

271,384,026

254,563,843

100,000 254,663,843 16,720,183 0 16,720,183

PELAKSANAAN JALAN NASIONAL 297 51 297 5188

PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI SULTENG 309,225,363 0 309,225,363 297,518,947 0

297,518,947

297,518,947 0 297,518,947 0 0 0

89PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI SULTENG 358,614,878 0 358,614,878 358,614,878 0

358,614,878

358,614,878 0 358,614,878 0 0 0

90PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI SULBAR 229,307,132 0 229,307,132 219,481,378 0

219,481,378

219,481,378 0 219,481,378 0 0 0

91PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI SULBAR 112,086,835 0 112,086,835 103,402,556 0

103,402,556

103,402,556 0 103,402,556 0 0 0

PELAKSANAAN JALAN NASIONAL 90 954 331 13 240 18 90 95492

PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI SULSEL 236,691,395 90,954,000 327,645,395 240,185,044

90,954,000

331,139,044

240,185,044

90,954,000 331,139,044 0 0 0

93PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI SULSEL 360,470,170 56,081,000 416,551,170 359,240,478

56,081,000

415,321,478

359,240,478

56,081,000 415,321,478 0 0 0

94

PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI SULTRA (BARAT) 305,621,819 100,000 305,721,819 299,094,961

34,100,000

333,194,961

299,094,961

34,100,000 333,194,961 0 0 0

PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI SULTRA 329 35 329 35

95WILAYAH II PROVINSI SULTRA (TIMUR) 343,507,911 0 343,507,911 329,355,955 0

329,355,955

329,355,955 0 329,355,955 0 0 0

96

PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI SULTRA (BUTON) 173,478,346 0 173,478,346 154,999,524 0

154,999,524

154,999,524 0 154,999,524 0 0 0

TOTAL 3,120,250,148 2,755,003,02738,833,531,19

634,459,123,15

62,641,287,036

37,100,410,19

2

34,743,996,4

54

3,132,286,68

237,876,283,13

6 284,873,298490,999,64

6775,872,94

4

VERIFIKASI DATA DIPA PER SATUAN KERJA TA 2013

KEMENTERIAN PEKERJAAN UMUM

No Nama Satuan Kerja DIPA Awal (APBN) Dokumen DIPA (Revisi) Pagu e-Monitoring Selisih

RPM PLN TOTAL RPM PLN TOTAL RPM PLN TOTAL RPM PLN TOTAL

97DINAS PEKERJAAN UMUM PROVINSI KALIMANTAN BARAT 21,355,901 0

21,355,901 20,762,155 0 20,762,155 20,762,155 0 20,762,155 0 0 0

DINAS PEKERJAAN UMUM PROV 58 959 598

DINAS PEKERJAAN UMUM PROV. KALIMANTAN TENGAH 58,959,566 0

58,959,566 56,867,446 0 56,867,446 56,867,446 0 56,867,446 0 0 0

99DINAS PEKERJAAN UMUM PROV. KALSEL 29,267,667 0

29,267,667 28,002,316 0 28,002,316 28,002,316 0 28,002,316 0 0 0

100

DINAS PEKERJAAN UMUM DAN KIMPRASWIL PROVINSI KALIMANTAN TIMUR 81,251,032 0

81,251,032 76,239,472 0 76,239,472 76,239,472 0 76,239,472 0 0 0

BALAI BESAR PELAKSANAAN JALAN NASIONAL VII (KALBAR

101

JALAN NASIONAL VII (KALBAR, KALTENG, KALSEL DAN KALTIM) DI BANJARMASIN 88,546,799 1,020,000

89,566,799 69,898,161 1,020,000 70,918,161 69,898,161 1,020,000 70,918,161 0 0 0

102

PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI KALIMANTAN BARAT 44,927,186 0

44,927,186 43,351,091 750,000 44,101,091 43,351,091 750,000 44,101,091 0 0 0

103

PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI KALIMANTAN TENGAH 45 074 761 0

45,074,761 42 325 442 0 42 325 442 42 325 442 0 42 325 442 0 0 0103PROVINSI KALIMANTAN TENGAH 45,074,761 0 61 42,325,442 0 42,325,442 42,325,442 0 42,325,442 0 0 0

104

PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI KALIMANTAN TIMUR 89,830,307 0

89,830,307 85,442,995 0 85,442,995 85,442,995 0 85,442,995 0 0 0

105PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI KALBAR 443,059,43051,764,640

494,824,070 443,059,430 51,764,640 494,824,070 406,015,404 51,764,640 457,780,044 37,044,026 0 37,044,026

106PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI KALBAR 154,005,61340,117,000

194,122,613 144,941,332 70,117,000 215,058,332 155,838,052 70,117,000 225,955,052

-10,896,720 0

-10,896,720

PELAKSANAAN JALAN NASIONAL 413 425107

PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI KALBAR 379,828,99433,597,000

413,425,994 379,828,994 33,597,000 413,425,994 345,509,231 33,597,000 379,106,231 34,319,763 0 34,319,763

108PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI KALTENG 326,839,418 0

326,839,418 313,854,271 0 313,854,271 313,854,271 0 313,854,271 0 0 0

109PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI KALTENG 397,455,998 0

397,455,998 360,637,569 0 360,637,569 360,637,569 0 360,637,569 0 0 0

110PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI KALTENG 440,291,841 0

440,291,841 434,518,670 0 434,518,670 434,518,670 0 434,518,670 0 0 0

PELAKSANAAN JALAN NASIONAL 864 125111

PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI KALTIM 864,125,977 0

864,125,977 800,074,037 0 800,074,037 800,074,037 0 800,074,037 0 0 0

112PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI KALTIM 572,526,738 0

572,526,738 550,025,754 0 550,025,754 550,025,754 0 550,025,754 0 0 0

113PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI KALTIM 615,456,276

159,463,000

774,919,276 544,497,085 159,463,000 703,960,085 544,497,085 159,463,000 703,960,085 0 0 0

114PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI KALSEL 310,748,91839,553,000

350,301,918 306,840,580 39,553,000 346,393,580 306,840,580 39,553,000 346,393,580 0 0 0

PELAKSANAAN JALAN NASIONAL 376 631115

PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI KALSEL 345,762,14330,869,000

376,631,143 334,853,751 30,869,000 365,722,751 334,853,751 30,869,000 365,722,751 0 0 0

TOTAL5,309,314,56

5356,383,64

05,665,69

8,2055,036,020,55

1 387,133,640 5,423,154,191 4,975,553,482 387,133,640 5,362,687,122 60,467,069 0 60,467,069

VERIFIKASI DATA DIPA PER SATUAN KERJA TA 2013

KEMENTERIAN PEKERJAAN UMUMDIPA A l (APBN) D k DIPA (R i i) P M it i S li ih

No Nama Satuan Kerja

DIPA Awal (APBN) Dokumen DIPA (Revisi) Pagu e-Monitoring Selisih

RPM PLNTOTA

L RPM PLN TOTAL RPM PLN TOTAL RPM PLN TOTAL

116DINAS PEKERJAAN UMUM PROV. BALI 8,970,452 0

8,970,452 8,837,564 0 8,837,564 8,837,564 0 8,837,564 0 0 0

117DINAS PEKERJAAN UMUM PROVINSI NTB 13,681,837 0

13,681,837 10,187,528 0 10,187,528 10,187,528 0 10,187,528 0 0 0

118DINAS PEKERJAAN UMUM PROP. NUSA TENGGARA TIMUR 9 086 804 0

9,086,804 9 086 804 0 9 086 804 9 086 804 0 9 086 804 0 0 0118NUSA TENGGARA TIMUR 9,086,804 0 804 9,086,804 0 9,086,804 9,086,804 0 9,086,804 0 0 0

119

BALAI PELAKSANAAN JALAN NASIONAL VIII (BALI,NTB,NTT) DI DENPASAR 100,005,825 0

100,005,825 78,721,360 0 78,721,360 78,721,360 0 78,721,360 0 0 0

120

PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI BALI 26,658,423 0

26,658,423 24,315,638 0 24,315,638 24,315,638 0 24,315,638 0 0 0

PERENCANAAN DAN PENGAWASAN JALAN NASIONAL

121

PENGAWASAN JALAN NASIONAL PROVINSI NUSA TENGGARA BARAT 49,472,752 0

49,472,752 49,472,752 0 49,472,752 57,725,685 0 57,725,685 -8,252,933 0 -8,252,933

122

PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI NUSA TENGGARA TIMUR 57,967,906 0

57,967,906 57,967,906 0 57,967,906 57,967,906 0 57,967,906 0 0 0

123PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI BALI 302 346 561 0

302,346 561 270 688 321 0 270 688 321 270 688 321 0 270 688 321 0 0 0123WILAYAH I PROVINSI BALI 302,346,561 0 6,561 270,688,321 0 270,688,321 270,688,321 0 270,688,321 0 0 0

124PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI BALI 85,952,695 0

85,952,695 82,461,763 0 82,461,763 82,461,763 0 82,461,763 0 0 0

125PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI NTB 205,064,375 0

205,064,375 186,898,213 0 186,898,213 251,678,213 0 251,678,213 -64,780,000 0 -64,780,000

126PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI NTB 271,572,883 200,000

271,772,883 271,572,883 200,000 271,772,883 343,831,396 200,000 344,031,396 -72,258,513 0 -72,258,513

127PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI NTB 209 908 153 100 000

210,008 153 209 908 153 100 000 210 008 153 303 851 380 100 000 303 951 380 93 943 227 0 93 943 227127WILAYAH III PROVINSI NTB 209,908,153 100,000 8,153 209,908,153 100,000 210,008,153 303,851,380 100,000 303,951,380 -93,943,227 0 -93,943,227

128PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI NTT 263,674,151 0

263,674,151 261,291,599 0 261,291,599 261,291,599 0 261,291,599 0 0 0

129PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI NTT 317,779,829 0

317,779,829 314,815,414 0 314,815,414 314,815,414 0 314,815,414 0 0 0

130PELAKSANAAN JALAN NASIONAL WILAYAH IV PROVINSI NTT 148,399,107 30,673,000

179,072,107 149,309,644 30,673,000 179,982,644 149,309,644 30,673,000 179,982,644 0 0 0

131PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI NTT 152 419 203 0

152,419 203 150 584 817 0 150 584 817 150 584 817 0 150 584 817 0 0 0131WILAYAH III PROVINSI NTT 152,419,203 0 9,203 150,584,817 0 150,584,817 150,584,817 0 150,584,817 0 0 0

TOTAL 2,222,960,956 30,973,000

2,253,933,95

62,136,120,35

9 30,973,000 2,167,093,359 2,375,355,032 30,973,000 2,406,328,032-239,234,673 0-239,234,673

VERIFIKASI DATA DIPA PER SATUAN KERJA TA 2013

KEMENTERIAN PEKERJAAN UMUM

No Nama Satuan Kerja DIPA Awal (APBN) Dokumen DIPA (Revisi) Pagu e-Monitoring Selisih

RPM PLN TOTAL RPM PLN TOTAL RPM PLN TOTAL RPM PLN TOTAL

132DINAS PEKERJAAN UMUM PROV. MALUKU 18,887,752 0 18,887,752 17,726,448 0 17,726,448 17,726,448 0 17,726,448 0 0 0BALAI BESAR PELAKSANAAN JALAN 

133

NASIONAL IX (MALUKU & MALUKU UTARA) DI AMBON 54,791,976 0 54,791,976 32,714,723 0 32,714,723 32,714,723 0 32,714,723 0 0 0

134

PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI MALUKU 44,830,108 0 44,830,108 44,830,108 0 44,830,108 47,176,786 0 47,176,786 -2,346,678 0 -2,346,678PERENCANAAN DAN 

135

PENGAWASAN JALAN NASIONAL PROVINSI MALUKU UTARA 35,577,177 0 35,577,177 33,331,415 0 33,331,415 33,331,415 0 33,331,415 0 0 0

136

PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI MALUKU 120,502,725 0 120,502,725 115,377,209 0 115,377,209 144,424,769 0 144,424,769 -29,047,560 0 -29,047,560PELAKSANAAN JALAN NASIONAL WILAYAH II 

137PROVINSI MALUKU 166,595,049 0 166,595,049 166,595,049 0 166,595,049 272,227,496 0 272,227,496-105,632,447 0-105,632,447

138

PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI MALUKU 123,982,815 0 123,982,815 123,982,815 0 123,982,815 202,895,786 0 202,895,786 -78,912,971 0 -78,912,971

139

PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI MALUKU UTARA 362,918,055 0 362,918,055 356,001,203 0 356,001,203 356,001,203 0 356,001,203 0 0 0

140

PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI MALUKU UTARA 223,221,840 0 223,221,840 217,248,672 0 217,248,672 217,248,672 0 217,248,672 0 0 0

TOTAL 1,151,307,497 0 1,151,307,497 1,107,807,642 0 1,107,807,642 1,323,747,298 0 1,323,747,298-215,939,656 0-215,939,656

VERIFIKASI DATA DIPA PER SATUAN KERJA TA 2013

KEMENTERIAN PEKERJAAN UMUM

No Nama Satuan Kerja DIPA Awal (APBN) Dokumen DIPA (Revisi) Pagu e-Monitoring Selisih

RPM PLN TOTAL RPM PLN TOTAL RPM PLN TOTAL RPM PLN TOTAL141DINAS PU PROV. PAPUA 30,569,265 0 30,569,265 30,569,265 0 30,569,265 30,569,265 0 30,569,265 0 0 0141 30,569,265 0 30,569,265 30,569,265 0 30,569,265 30,569,265 0 30,569,265 0 0 0

142DINAS PEKERJAAN UMUM PROVINSI PAPUA BARAT 7,471,794 0 7,471,794 7,471,794 0 7,471,794 7,471,794 0 7,471,794 0 0 0

143

BALAI BESAR PELAKSANAAN JALAN NASIONAL X (PAPUA DAN IRJABAR) DI JAYAPURA 92,990,016 0 92,990,016 92,990,016 0 92,990,016 92,990,016 0 92,990,016 0 0 0

144PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI PAPUA BARAT 110,760,565 0 110,760,565110,760,565 0 110,760,565 110,760,565 0 110,760,565 0 0 0PELAKSANAAN JALAN NASIONAL WILAYAH I 

145PROVINSI PAPUA (JAYAPURA) 514,957,850 0 514,957,850499,981,004 0 499,981,004 499,981,004 0 499,981,004 0 0 0

146PELAKSANAAN JALAN NASIONAL WILAYAH IX PROVINSI PAPUA (BIAK SERUI) 39,195,480 0 39,195,480 39,195,480 0 39,195,480 39,195,480 0 39,195,480 0 0 0

147PELAKSANAAN JALAN NASIONAL WILAYAH IV PROVINSI PAPUA (JAYAWIJAYA) 476,647,048 0 476,647,048476,647,048 0 476,647,048 476,647,048 0 476,647,048 0 0 0

148PELAKSANAAN JALAN NASIONAL WILAYAH VI PROVINSI PAPUA (TIMIKA) 273,750,609 0 273,750,609232,635,073 0 232,635,073 232,635,073 0 232,635,073 0 0 0PELAKSANAAN JALAN NASIONAL WILAYAH II 

149PROVINSI PAPUA (MERAUKE) 286,370,770 0 286,370,770277,290,617 0 277,290,617 277,290,617 0 277,290,617 0 0 0

150PELAKSANAAN JALAN NASIONAL WILAYAH VII PROVINSI PAPUA (NABIRE) 251,665,964 0 251,665,964251,665,964 0 251,665,964 311,665,964 0 311,665,964 -60,000,000 0 -60,000,000

151PELAKSANAAN JALAN NASIONAL WILAYAH VIII PROVINSI PAPUA (PANIAI) 379,298,142 0 379,298,142379,298,142 0 379,298,142 379,904,891 0 379,904,891 -606,749 0 -606,749

152PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI PAPUA (TANAH MERAH) 438,758,101 0 438,758,101460,206,225 0 460,206,225 460,206,225 0 460,206,225 0 0 0PELAKSANAAN JALAN NASIONAL WILAYAH V 

153PROVINSI PAPUA (PUNCAK JAYA) 355,531,637 0 355,531,637347,039,158 0 347,039,158 347,039,158 0 347,039,158 0 0 0

154PELAKSANAAN JALAN NASIONAL WILAYAH V PROVINSI PAPUA BARAT (FAK‐FAK) 257,270,664 0 257,270,664257,270,664 0 257,270,664 257,270,664 0 257,270,664 0 0 0

155PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI PAPUA BARAT (SORONG) 458,108,278 0 458,108,278458,108,278 0 458,108,278 492,087,686 0 492,087,686 -33,979,408 0 -33,979,408

156PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI PAPUA BARAT (MANOKWARI ) 340,358,225 0 340,358,225340,358,225 0 340,358,225 340,358,225 0 340,358,225 0 0 0PELAKSANAAN JALAN NASIONAL WILAYAH 

157III PROVINSI PAPUA BARAT (MAYBRAT) 104,271,240 0 104,271,240 93,660,623 0 93,660,623 93,660,623 0 93,660,623 0 0 0

158PELAKSANAAN JALAN NASIONAL WILAYAH IV PROVINSI PAPUA BARAT (BINTUNI) 91,064,230 0 91,064,230 91,064,230 0 91,064,230 154,076,133 0 154,076,133 -63,011,903 0 -63,011,903

159PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI PAPUA 153,974,075 0 153,974,075153,974,075 0 153,974,075 153,974,075 0 153,974,075 0 0 0

TOTAL 4,663,013,953 04,663,013,95

34,600,186,4

46 04,600,186,44

64,757,784,50

6 0 4,757,784,506 -157,598,060 0-157,598,060

VERIFIKASI DATA DIPA PER SATUAN KERJA TA 2013VERIFIKASI DATA DIPA PER SATUAN KERJA TA 2013

KEMENTERIAN PEKERJAAN UMUM

No Nama Satuan Kerja

DIPA Awal (APBN) Dokumen DIPA (Revisi) Pagu e-Monitoring Selisih

RPM PLN TOTAL RPM PLN TOTAL RPM PLN TOTAL RPMPLN TOTAL

160DINAS PEKERJAAN UMUM PROV. SULUT 15,981,551 0 15,981,551 15,981,551 0 15,981,551 15,981,551 0 15,981,551 0 0 0

161DINAS PRASARANA WILAYAH PROV. GORONTALO 19,026,237 0 19,026,237 18,703,703 0 18,703,703 18,703,703 0 18,703,703 0 0 0

162

BALAI PELAKSANAAN JALAN NASIONAL XI (GORONTALO DAN SULAWESI UTARA) DI MANADO 126,241,096 0 126,241,096 89,505,690 0 89,505,690 89,505,690 0 89,505,690 0 0 0PERENCANAAN DAN PENGAWASAN JALAN 

163NASIONAL PROVINSI SULAWESI UTARA 29,830,645 0 29,830,645 29,830,645 0 29,830,645 29,830,645 0 29,830,645 0 0 0

164

PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI GORONTALO 29,075,472 0 29,075,472 29,075,472 0 29,075,472 28,320,241 0 28,320,241 755,231 0 755,231

165

PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI SULUT 502 426 362 100 000 502 526 362 452 058 275 100 000 452 158 275 452 058 275 100 000 452 158 275 0 0 0165PROVINSI SULUT 502,426,362 100,000 502,526,362 452,058,275 100,000 452,158,275 452,058,275 100,000 452,158,275 0 0 0

166

PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI SULUT 640,360,207 4,900,000 645,260,207 640,360,207 4,900,000 645,260,207 615,100,9254,900,000 620,000,925 25,259,282 0 25,259,282

167

PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI SULUT (SANGIHE TALAUD) 154,030,745 0 154,030,745 143,942,815 0 143,942,815 153,942,815 0 153,942,815

-10,000,000 0

-10,000,000

PELAKSANAAN JALAN

168

PELAKSANAAN JALAN NASIONAL WILAYAH PROVINSI GORONTALO 475,491,687 0 475,491,687 455,049,819 0 455,049,819 455,049,819 0 455,049,819 0 0 0

TOTAL 1,992,464,002 5,000,000 1,997,464,002 1,874,508,177 5,000,0001,879,508,17

71,858,493,66

45,000,000 1,863,493,664 16,014,513 0 16,014,513

VERIFIKASI DATA DIPA PER SATUAN KERJA TA 2013

KEMENTERIAN PEKERJAAN UMUM

No Nama Satuan Kerja DIPA Awal (APBN) Dokumen DIPA (Revisi) Pagu e-Monitoring Selisih

RPM PLN TOTAL RPM PLN TOTAL RPM PLN TOTAL RPM PLN TOTALPEMBINAAN PENANGANAN 

169JALAN (DITJEN BINA MARGA)

11,401,365 0 11,401,365 11,401,365 0 11,401,365 9,484,108 0 9,484,1081,917,257 01,917,257

170INVENTARISASI DAN PENGADAAN LAHAN 1,092,308,162 0 1,092,308,162 1,092,308,162 0 1,092,308,162 1,092,308,162 0 1,092,308,162 0 0 0

171PENANGANAN MENDESAK DAN TANGGAP DARURAT 376,030,244 0 376,030,244 376,030,244 0 376,030,244 376,030,244 0 376,030,244 0 0 0

172SEKRETARIAT DIREKTORAT JENDERAL BINA MARGA 127,234,919 0 127,234,919 125,923,214 0 125,923,214 125,923,214 0 125,923,214 0 0 0

173DIREKTORAT BINA TEKNIK 142,587,701 2,399,000 144,986,701 132,370,850 2,399,000 134,769,850 132,370,850 2,399,000 134,769,850 0 0 0

174DIREKTORAT BINA PROGRAM 72,155,117 0 72,155,117 65,225,593 0 65,225,593 64,599,733 0 64,599,733 625,860 0 625,860

175PERENCANAAN JEMBATAN SELAT SUNDA 19,545,094 0 19,545,094 19,545,094 0 19,545,094 18,545,094 0 18,545,0941,000,000 01,000,000

176DIREKTORAT BINA PELAKSANAAN WILAYAH I 38,619,896 0 38,619,896 36,863,055 0 36,863,055 36,863,055 0 36,863,055 0 0 0

177DIREKTORAT BINA  39 791 875 11 734 027 51 525 902 39 791 875 11 734 027 51 525 902 39 791 875 11 734 027 51 525 902 0 0 0177PELAKSANAAN WILAYAH II 39,791,875 11,734,027 51,525,902 39,791,875 11,734,027 51,525,902 39,791,875 11,734,027 51,525,902 0 0 0

178DIREKTORAT BINA PELAKSANAAN WILAYAH III 37,331,281 10,000,000 47,331,281 37,331,281 10,000,000 47,331,281 37,331,281 10,000,000 47,331,281 0 0 0

179SEKRETARIAT PENGATUR JALAN TOL 78,317,078 0 78,317,078 78,317,078 0 78,317,078 78,317,078 0 78,317,078 0 0 0

180

PEMBINAAN ADMINSITRASI DAN PELAKSANAAN  9,158,483 30,679,753 39,838,236 8,814,894 30,679,753 39,494,647 8,814,894 30,679,753 39,494,647 0 0 0

PENGENDALIAN PHLN

181

BADAN LAYANAN UMUM (BLU) BIDANG PENDANAAN SEKRETARIAT BADAN PENGATUR JALAN TOL (BPJT)

25,000,000 0 25,000,000 25,000,000 0 25,000,000 25,000,000 0 25,000,000 0 0 0

182UNIT PERALATAN DAN PENGUJIAN CIKAMPEK 10,242,750 0 10,242,750 10,242,750 0 10,242,750 10,242,750 0 10,242,750 0 0 0

183

UNIT PENGEMBANGAN KAPASITAS TENAGA KEBINAMARGAAN WILAYAH I

3,622,770 0 3,622,770 3,622,770 0 3,622,770 3,622,770 0 3,622,770 0 0 0

184

UNIT PENGEMBANGAN KAPASITAS TENAGA KEBINAMARGAAN WILAYAH II

1,839,745 0 1,839,745 1,839,745 0 1,839,745 1,839,745 0 1,839,745 0 0 0

185

UNIT PENGEMBANGAN KAPASITAS TENAGA KEBINAMARGAAN WILAYAH III

2,513,711 0 2,513,711 2,513,711 0 2,513,711 2,513,711 0 2,513,711 0 0 0

TOTAL 2,087,700,191 54,812,780 2,142,512,971 2,067,141,681 54,812,780 2,121,954,461 2,063,598,564 54,812,780 2,118,411,3443,543,117 03,543,117

Progres Keuangan & Fisik T.A. 2013T.A. 2013

KEMENTERIAN PEKERJAAN UMUM

Status  20 september 2013

KEMENTERIAN PEKERJAAN UMUMDIREKTORAT  JENDERAL BINA  MARGA

PAGU e Monitoring (Rp Ribu) REALISASI (Rp Ribu)NO UNIT ORGANISASI

PAGU e‐Monitoring (Rp Ribu) REALISASI (Rp Ribu)FISIK (%)RPM PLN TOTAL % RPM PLN TOTAL %

1 SETJEN 715.897.061 0 715.897.061 0,87 358.178.305 0 358.178.305 50,03 45,62

2 ITJEN 126.233.000 0 126.233.000 0,15 45.517.280 0 45.517.280 36,06 6,97

3 DITJEN TARU 773.291.100 0 773.291.100 0,94 310.449.966 0 310.449.966 40,15 44,68

4 DITJEN SDA 19.059.689.445 2.417.493.468 21.477.182.913 26,03 8.288.212.934 890.336.533 9.178.549.466 42,74 47,80

5 DITJEN BM 34.686.460.277 3.132.286.682 37.818.746.959 45,83 17.987.592.757 895.885.494 18.883.478.251 49,93 58,41

6 DITJEN CK 18.238.983.107 2.621.456.567 20.860.439.674 25,28 6.172.357.958 781.565.583 6.953.923.541 33,34 32,38

7 BALITBANG 427.113.185 13.332.002 440.445.187 0,53 239.287.745 10.141.254 249.428.999 56,63 61,69

8 BP KONSTRUKSI 309.426.120 0 309.426.120 0,37 142.359.614 156.396 142.516.010 46,06 52,07

TOTAL 74.337.093.295  8.184.568.719  82.521.662.014  100,00 33.543.956.559 2.578.085.260 36.122.041.819 43,77 48,76

LAPORAN PELAKSANAAN ANGGARAN PER BALAI TA 2013DI LINGKUNGAN DITJEN BINA MARGA

STATUS 16 September 2013 ; 16:00 WIB

No BalaiPAGU e‐Monitoring REALISASI

Progres (%)(Rp Ribu)  (Rp Ribu)

RPM PLN TOTAL RPM PLN TOTAL Keu Fis

1BALAI BESAR I MEDAN 2.540.123.237 427.498.640 2.967.621.877 1.181.910.484 78.873.000 1.260.783.484 42,48 45,71

2BALAI BESAR II PADANG 2.906.966.328 97.233.598 3.004.199.926 1.647.196.890 18.662.073 1.665.858.963 55,45 64,39

3BALAI BESAR III PALEMBANG 2.035.392.928 100.379.668 2.135.772.596 1.182.742.121 45.699.516 1.228.441.637 57,52 68,68

4BALAI BESAR IV JAKARTA 3.032.653.154 1.420.177.247 4.452.830.401 1.425.195.983 447.257.217 1.872.453.200 42,05 46,44

5BALAI BESAR V SURABAYA 3.377.645.404 152.879.749 3.530.525.153 1.482.265.250 6.691.786 1.488.957.036 42,17 54,69

6BALAI BESAR VI MAKASSAR 3.004.394.334 181.235.000 3.185.629.334 1.307.673.078 99.641.037 1.407.314.114 44,18 53,57

7BALAI BESAR VII BANJARMASIN 5.138.735.059 662.097.000 5.800.832.059 3.008.573.397 146.933.602 3.155.506.999 54,40 63,50

8BALAI IX AMBON 1.636.338.448 0 1.636.338.448 794.057.838 0 794.057.838 48,53 62,21

9BALAI VIII DENPASAR 2.586.371.007 30.973.000 2.617.344.007 1.425.634.531 20.912.900 1.446.547.431 55,27 65,94

10BALAI X JAYAPURA 4.919.065.245 0 4.919.065.245 3.021.020.563 0 3.021.020.563 61,41 70,56

11BALAI XI MANADO 1.863.173.115 5.000.000 1.868.173.115 876.988.056 0 876.988.056 46,94 54,44

12PUSAT 2.051.059.424 54.812.780 2.105.872.204 664.108.060 31.214.363 695.322.423 33,02 34,81

TOTAL 35.091.917.683 3.132.286.682 38.224.204.365 18.017.366.250 895.885.494 18.913.251.743 49,48 57,87

RSATKER KRITIS PELAKSANAAN ANGGARAN PER SATUAN KERJA TA 2013DI BBPJN I SD VIII

LINGKUNGAN DITJEN BINA MARGASTATUS 06 September 2013 ; 08:00 WIB

NO NAMA SATUAN KERJA PAGU REALISASI PROGRES(%)

RPM PLN TOTAL RPM PLN TOTAL KEU FISIKBALAI BESAR PELAKSANAAN JALAN NASIONAL I (NAD,SUMUT) DI MEDAN

1 PELAKSANAAN JALAN BEBAS HAMBATAN MEDAN ‐ KUALANAMU 12,656,821 240,000,000 252,656,821 4,772,626 0 4,772,626 1.89 13.17

27PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI SUMATERA UTARA 423,857,165 9,284,000 433,141,165 159,121,870 0 159,121,870 36.74 36.37

29 PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI SUMATERA UTARA 587,386,314 0 587,386,314 222,096,072 0 222,096,072 37.81 40.4734 PELAKSANAAN JALAN NASIONAL METROPOLITAN MEDAN 334,074,375 0 334,074,375 128,668,363 0 128,668,363 38.51 38.5737 BALAI BESAR PELAKSANAAN JALAN NASIONAL I (NAD,SUMUT) DI MEDAN 64,284,348 18,881,000 83,165,348 32,940,152 0 32,940,152 39.61 60.2352 PELAKSANAAN JALAN NASIONALWILAYAH I PROVINSI ACEH 475 058 854 158 933 640 633 992 494 194 712 496 78 873 000 273 585 495 43 15 38 7352 PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI ACEH 475,058,854 158,933,640 633,992,494 194,712,496 78,873,000 273,585,495 43.15 38.73

BALAI BESAR PELAKSANAAN JALAN NASIONAL II (SUMBAR, JAMBI, RIAU, KEP. RIAU) DI PADANG

49 PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI SUMBAR 486,915,530 51,955,575 538,871,105 229,585,952 0 229,585,952 42.6 44.68

24BALAI BESAR PELAKSANAAN JALAN NASIONAL II (SUMBAR, JAMBI, RIAU, KEP. RIAU) DI PADANG 63,595,276 12,800,000 76,395,276 26,893,854 0 26,893,854 35.2 59.18BALAI BESAR PELAKSANAAN JALAN NASIONAL III (BENGKULU, LAMPUNG, SUMSEL, DAN BABEL) DI PALEMBANG

32 PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI BENGKULU 79,218,589 25,187,196 104,405,785 40,015,996 0 40,015,996 38.33 42.01BALAI BESAR PELAKSANAAN JALAN NASIONAL IV (BANTEN DKI DANBALAI BESAR PELAKSANAAN JALAN NASIONAL IV (BANTEN, DKI, DAN JABAR) DI DKI JAKARTA

9BALAI BESAR PELAKSANAAN JALAN NASIONAL IV (BANTEN, DKI, DAN JABAR) DI DKI JAKARTA 125,991,549 100,000,000 225,991,549 45,953,720 0 45,953,720 20.33 20.28

15 PERENCANAAN JEMBATAN SELAT SUNDA 18,545,094 0 18,545,094 5,078,097 0 5,078,097 27.38 54.0923 PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI JABAR 850,916,024 0 850,916,024 294,670,961 0 294,670,961 34.63 27.2225 PELAKSANAAN JALAN BEBAS HAMBATAN TANJUNG PRIOK 111,780,310 925,713,247 1,037,493,557 18,177,078 357,107,956 375,285,034 36.17 33.7338 PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI JABAR 73,970,955 0 73,970,955 29,486,333 0 29,486,333 39.86 50.9944 UNIT PERALATAN DAN PENGUJIAN CIKAMPEK 10,242,750 0 10,242,750 4,277,686 0 4,277,686 41.76 41.946 PELAKSANAAN JALAN NASIONALWILAYAH II PROVINSI BANTEN 233 602 171 14 464 000 248 066 171 88 697 225 16 107 946 104 805 171 42 25 57 4446 PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI BANTEN 233,602,171 14,464,000 248,066,171 88,697,225 16,107,946 104,805,171 42.25 57.4459 PELAKSANAAN JALAN NASIONAL METROPOLITAN II JAKARTA 274,313,180 0 274,313,180 120,309,888 0 120,309,888 43.86 62.97

BALAI BESAR PELAKSANAAN JALAN NASIONAL V (JATENG, DIY, JATIM) DI SURABAYA

11 PELAKSANAAN JALAN BEBAS HAMBATAN SOLO ‐ KERTOSONO 484,978,989 800,000 485,778,989 108,485,010 0 108,485,010 22.33 11.2514 PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI JATIM 168,453,600 54,238,286 222,691,886 57,267,311 0 57,267,311 25.72 49.6819 PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI JATENG 459,611,932 66,084,000 525,695,932 155,390,396 462,978 155,853,374 29.65 38.78

26BALAI BESAR PELAKSANAAN JALAN NASIONAL V (JATENG, DIY, JATIM) DI SURABAYA 111,132,598 12,920,000 124,052,598 44,886,625 0 44,886,625 36.18 38.53

33 PELAKSANAAN JALAN NASIONAL METROPOLITAN I SURABAYA 141,852,319 0 141,852,319 54,436,157 0 54,436,157 38.38 58.03, , , , , , , ,

41PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI JAWATIMUR 40,314,103 0 40,314,103 16,253,771 0 16,253,771 40.32 63.89

48 PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI JATIM 278,378,104 0 278,378,104 118,237,354 0 118,237,354 42.47 58.5858 PELAKSANAAN JALAN NASIONAL WILAYAH II PROPINSI JAWA TENGAH 476,196,436 18,066,103 494,262,539 211,356,207 5,360,246 216,716,453 43.85 52.9

BALAI PELAKSANAAN JALAN NASIONAL VIII (BALI,NTB,NTT) DI DENPASAR51 PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI BALI 270,688,321 0 270,688,321 116,310,533 0 116,310,533 42.97 40.4762 PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI BALI 24,315,638 0 24,315,638 10,907,736 0 10,907,736 44.86 75.06

TOTAL 6,682,331,345 1,709,327,047 8,391,658,392 2,538,989,469 457,912,126 2,996,901,594 967 1,209

SATKER KRITIS PELAKSANAAN ANGGARAN PER SATUAN KERJA TA 2013

SATKER PUSATSTATUS 06 September 2013 ; 08:00 WIBSTATUS 06 September 2013 ; 08:00 WIB

NO NAMA SATUAN KERJA

PAGU REALISASI PROGRES(%)

RPM PLN TOTAL RPM PLN TOTAL KEU FISIK

2PENANGANAN MENDESAK DAN TANGGAP DARURAT 376,030,244 0 376,030,244 15,692,809 0 15,692,809 4.17 5.18BADAN LAYANAN UMUM (BLU) BIDANG 

3

( )PENDANAAN SEKRETARIAT BADAN PENGATUR JALAN TOL (BPJT) 25,000,000 0 25,000,000 2,079,250 0 2,079,250 8.32 8.2

5PEMBINAAN PENANGANAN JALAN (DITJEN BINA MARGA) 9,484,108 0 9,484,108 998,313 0 998,313 10.53 12.36

6 INVENTARISASI DAN PENGADAAN LAHAN 1,092,308,162 01,092,308,162 194,420,699 0 194,420,699 17.8 17.87

7 SEKRETARIAT PENGATUR JALAN TOL 78 317 078 0 78 317 078 14 287 114 0 14 287 114 18 24 19 527 SEKRETARIAT PENGATUR JALAN TOL 78,317,078 0 78,317,078 14,287,114 0 14,287,114 18.24 19.52

17UNIT PENGEMBANGAN KAPASITAS TENAGA KEBINAMARGAAN WILAYAH I 3,622,770 0 3,622,770 1,054,213 0 1,054,213 29.1 27.18

21 DIREKTORAT BINA TEKNIK 132,370,850 2,399,000 134,769,850 41,573,632 0 41,573,632 30.85 47.32

35 DIREKTORAT BINA PELAKSANAAN WILAYAH I 36,863,055 0 36,863,055 14,371,375 0 14,371,375 38.99 51.05

44 UNIT PERALATAN DAN PENGUJIAN CIKAMPEK 10,242,750 0 10,242,750 4,277,686 0 4,277,686 41.76 41.9

45 DIREKTORAT BINA PELAKSANAAN WILAYAH III 37,331,281 10,000,000 47,331,281 11,231,768 8,601,564 19,833,332 41.9 40.95

53 DIREKTORAT BINA PROGRAM 64,599,733 0 64,599,733 27,907,752 0 27,907,752 43.2 40.43

TOTAL 1,866,170,031 12,399,0001,878,569,031 327,894,611 8,601,564 336,496,175 17.91 28.36

SATKER KRITIS PELAKSANAAN ANGGARAN PER SATUAN KERJA TA 2013DI BPJN IV;VII;IX;X;XI LINGKUNGAN DITJEN BINA MARGA

STATUS 06 September 2013 ; 08:00 WIB

NO NAMA SATUAN KERJA PAGU REALISASI PROGRES(%)

RPM PLN TOTAL RPM PLN TOTAL KEU FISIK

8PELAKSANAAN JALAN NASIONAL METROPOLITAN MAKASAR 143,612,064 0 143,612,064 27,416,345 0 27,416,345 19.09 40.21

10 PELAKSANAAN JEMBATAN TAYAN 89,806,057 274,963,360 364,769,417 6,767,702 73,729,814 80,497,516 22.07 31.97

12BALAI BESAR PELAKSANAAN JALAN NASIONAL X (PAPUA DAN IRJABAR) DI JAYAPURA 92,990,016 0 92,990,016 21,510,665 0 21,510,665 23.13 30.6

13 PELAKSANAAN JEMBATAN MERAH PUTIH 290,048,033 0 290,048,033 69,919,722 0 69,919,722 24.11 41.69

16PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI SULTENG 297,518,947 0 297,518,947 86,485,328 0 86,485,328 29.07 34.7116 297,518,947 0 297,518,947 86,485,328 0 86,485,328 29.07 34.71

18PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI MALUKU 272,227,496 0 272,227,496 80,166,195 0 80,166,195 29.45 48.68

20PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI SULAWESI UTARA 29,830,645 0 29,830,645 9,162,295 0 9,162,295 30.71 59.6

22PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI SULTENG 358,614,878 0 358,614,878 123,739,437 0 123,739,437 34.5 42.46

30PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI KALBAR 345,509,231 33,597,000 379,106,231 143,993,754 0 143,993,754 37.98 39.62, , , , , , , , , ,

31PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI SULTENG 254,563,843 100,000 254,663,843 97,462,722 0 97,462,722 38.27 53.96

36PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI MALUKU 202,895,786 0 202,895,786 80,355,220 0 80,355,220 39.6 39.69

39PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI SULTRA (TIMUR) 329,355,955 0 329,355,955 132,644,705 0 132,644,705 40.27 40.02

40PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI SULAWESI TENGAH 35,849,395 0 35,849,395 14,453,038 0 14,453,038 40.32 52.79, , , , , , , ,

42PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI SULTRA (BUTON) 154,999,524 0 154,999,524 63,237,941 0 63,237,941 40.8 39.26

43PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI SULUT 452,058,275 100,000 452,158,275 184,971,826 0 184,971,826 40.91 48.91

47PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI KALTIM 544,497,085 159,463,000 703,960,085 297,946,621 0 297,946,621 42.32 54.36

50PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI SULTRA (BARAT) 299,094,961 34,100,000 333,194,961 124,648,836 17,473,802 142,122,638 42.65 40.03( ) , , , , , , , , , , , ,

54PELAKSANAAN JALAN NASIONAL WILAYAH IV PROVINSI PAPUA BARAT (BINTUNI) 154,076,133 0 154,076,133 66,760,629 0 66,760,629 43.33 51.03

55PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI SULUT 615,100,925 4,900,000 620,000,925 268,677,605 0 268,677,605 43.34 49.96

56PELAKSANAAN JALAN NASIONAL WILAYAH IV PROVINSI PAPUA (JAYAWIJAYA) 476,647,048 0 476,647,048 207,334,987 0 207,334,987 43.5 61.62

57PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI SULAWESI TENGGARA 37,917,501 0 37,917,501 16,494,266 0 16,494,266 43.5 56.55, , , , , , , ,

60PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI KALBAR 155,838,052 70,117,000 225,955,052 90,520,378 9,561,259 100,081,637 44.29 46.92

63DINAS PEKERJAAN UMUM PROV. SULAWESI SELATAN 9,328,516 0 9,328,516 4,253,735 0 4,253,735 45.6 71.43

TOTAL 5,642,380,366 577,340,360 6,219,720,726 2,218,923,952 100,764,875 2,319,688,827 46.92 55.27

Progres LELANG T.A. 2013

KEMENTERIAN PEKERJAAN UMUM

Status  20 september 2013

KEMENTERIAN PEKERJAAN UMUMDIREKTORAT  JENDERAL BINA  MARGA

NO SATMINKAL

KONTRAKTUAL TERKONTRAK PROSES LELANG BELUM LELANG

KPA PKT

PAGU

KPA PKT

PAGU NILAI SISA

KPA PKT

PAGU

KPA PKT

PAGU

(Rp Ribu) (Rp Ribu) (Rp Ribu) (Rp Ribu) (Rp Ribu) (Rp Ribu)

1 SETJEN 20 153 72,539,766 16 103 52,302,447 48,773,252 3,529,195 6 19 12,979,783 12 31 7,257,535

2 ITJEN 1 5 4,420,832 1 2 773,700 729,339 44,361 1 1 1,735,235 1 2 1,911,897

3 DITJEN TARU 40 466 312,994,962 36 250 221,785,844 213,936,223 7,849,621 15 108 78,574,943 13 108 12,634,175

4 DITJEN SDA 130 4,506 14,750,916,322 125 3,699 12,237,778,709 11,562,052,158 675,726,551 86 435 1,598,918,934 70 372 914,218,679

5 DITJEN BM 187 3,503 32,589,744,537 186 3,183 30,032,698,272 29,728,304,624 304,393,648 59 184 1,871,207,077 45 136 685,839,188

6 DITJEN CK 187 6,912 12,430,123,098 177 5,516 10,406,750,285 10,067,063,302 339,686,983 94 759 1,165,010,036 91 637 858,362,777

7 BALITBANG 14 143 137,868,443 14 141 137,542,993 128,473,072 9,069,921 0 0 0 1 2 325,450

8 BP KONSTRUKSI 5 41 33,619,524 5 39 29,498,594 26,934,352 2,564,243 0 0 0 1 2 4,120,930

TOTAL 584 15 729 60 332 227 484 560 12 933 53 119 130 845 51 776 266 322 1 342 864 523 261 1 506 4 728 426 008 234 1 290 2 484 670 631TOTAL 584 15,729 60,332,227,484 560 12,933 53,119,130,845 51,776,266,322 1,342,864,523 261 1,506 4,728,426,008 234 1,290 2,484,670,631

Sandingan Paket Lelang eProcurement dan eMonitoringStatus Data : 16 September 2013 ; 16:00 WIB

No Unit Organisasi

e‐Procurement e‐Monitoring

Pkt

Pagu

Pkt PAGU DIPA

PAGU PAKET

(Rp Ribu)  (Termasuk MYC)

1SETJEN 73 66.150.395 66 57.645.743 58.359.710

2 ITJEN 3 2.508.935 3 2.508.935 12.621.958

3DITJEN TARU 341 297.314.314 334 276.987.586 282.680.723

4DITJEN SDA 3 518 13 400 360 080 3 306 10 814 415 621 13 124 416 3024DITJEN SDA 3.518 13.400.360.080 3.306 10.814.415.621 13.124.416.302

5 DITJEN BM 3.211 27.581.534.996 3.146 25.014.653.107 27.775.687.578

6DITJEN CK 6.1 11.070.990.937 5.985 8.852.688.129 15.432.590.285

7BALITBANG 83 113.429.298 82 95.735.924 98.551.232

8BP KONSTRUKSI 36 28.930.973 36 25.292.777 26.838.793

Total 13 365 52 561 219 928 12 952 45 139 927 822 56 811 746 581Total 13.365 52.561.219.928 12.952 45.139.927.822  56.811.746.581 

Sandingan Paket Lelang eProcurement dan eMonitoringDitjen Bina Marga

Status Data : 16 September 2013 ; 16:00 WIB

No Satuan Kerja 

e‐Procurement e‐Monitoring

PktPagu

Pkt PAGU DIPAPAGU PAKET

(Rp Ribu)  (Termasuk MYC)1DINAS BINA MARGA PROV. JAWA BARAT 4 87.626.050 4 69.541.215 69.541.2152DINAS BINA MARGA PROV. JAWA TENGAH 22 71.484.000 22 69.393.155 69.393.155DINAS PEKERJAAN UMUM, PERUMAHAN DAN ENERGI SUMBER 

3DAYA MINERAL PROVINSI D.I. YOGYAKARTA 4 21.031.325 4 20.735.173 20.735.1734DINAS BINA MARGA PROV. JAWA TIMUR 5 62.134.000 5 59.048.889 59.048.8895SKPD‐TP DINAS BINA MARGA PROVINSI ACEH 5 47.553.820 5 41.742.857 41.742.8579DINAS PEKERJAAN UMUM PROV. JAMBI 2 31.055.680 2 31.055.680 31.055.68010DINAS PU BINA MARGA PROV. SUMSEL 2 18.949.680 2 17.722.524 17.722.52411SKPD‐TP DINAS BINA MARGA PROVINSI LAMPUNG 2 17.319.080 2 16.172.961 16.172.96112Dinas Pekerjaan Umum Provinsi Kalimantan Barat 2 7.950.000 2 7.356.254 7.356.25413DINAS PEKERJAAN UMUM PROV. KALIMANTAN TENGAH 4 51.396.650 4 49.304.530 49.304.53014DINAS PEKERJAAN UMUM PROVINSI KALIMANTAN SELATAN 2 26.261.100 2 24.995.749 26.300.000

15DINAS PEKERJAAN UMUM DAN KIMPRASWIL PROVINSI KALIMANTAN TIMUR 8 77.490.400 8 72.478.840 72.478.840

17DINAS PERMUKIMAN DAN PRASARANA WILAYAH PROV. SULAWESI TENGAH 0 0 0 0 0

18DINAS PEKERJAAN UMUM PROV. SULAWESI SELATAN 1 3.186.940 1 3.186.940 3.186.94019SKPD DINAS PEKERJAAN UMUM PROV. SULAWESI TENGGARA 0 0 0 0 022DINAS PEKERJAAN UMUM PROVINSI NTB 1 11.330.000 1 7.781.291 7.781.29124DINAS PU PROV. PAPUA 3 29.719.125 3 28.806.613 28.806.61325DINAS PEKERJAAN UMUM PROVINSI BENGKULU 8 80.080.810 8 75.873.959 75.873.95926DINAS PEKERJAAN UMUM PROV. MALUKU UTARA 2 12.910.780 2 12.766.334 12.766.334

27SATUAN KERJA DINAS BINA MARGA DAN TATA RUANG PROVINSI BANTEN 5 29.913.480 5 28.326.825 28.326.825

28SKPD‐TP DINAS PEKERJAAN UMUM PROVINSI KEPULAUAN BANGKA BELITUNG 2 20.694.706 2 20.138.408 20.706.516

29Dinas Prasarana Wilayah Provinsi Gorontalo 3 13.926.545 3 13.554.011 13.554.01131DINAS PEKERJAAN UMUM PROVINSI PAPUA BARAT 2 6.552.880 2 6.552.880 6.552.88034PELAKSANAAN JALAN BEBAS HAMBATAN TANJUNG PRIOK 2 47.520.000 2 48.969.709 48.969.709

Sandingan Paket Lelang eProcurement dan eMonitoringDitjen Bina Marga

Status Data : 16 September 2013 ; 16:00 WIB

No Satuan Kerja 

e‐Procurement e‐Monitoring

PktPagu

Pkt PAGU DIPAPAGU PAKET

(Rp Ribu)  (Termasuk MYC)

35BALAI BESAR PELAKSANAAN JALAN NASIONAL I (NAD,SUMUT) DI MEDAN 16 22.759.141 12 7.772.647 7.772.647

36BALAI BESAR PELAKSANAAN JALAN NASIONAL II (SUMBAR, JAMBI, RIAU, KEP. RIAU) 26 28.320.015 25 24.910.516 27.790.856

37

BALAI BESAR PELAKSANAAN JALAN NASIONAL III (BENGKULU, LAMPUNG, SUMSEL, DAN BABEL) DI PALEMBANG 13 19.496.801 13 18.037.274 18.248.408BALAI BESAR PELAKSANAAN JALAN NASIONAL IV (BANTEN, 

38DKI, DAN JABAR) DI DKI JAKARTA 19 22.700.000 19 20.191.000 20.191.000

39BALAI BESAR PELAKSANAAN JALAN NASIONAL V (JATENG, DIY, JATIM) DI SURABAYA 28 47.615.430 28 40.522.568 40.542.988

40BALAI BESAR PELAKSANAAN JALAN NASIONAL VII (KALBAR, KALTENG, KALSEL DAN KALTIM) DI BANJARMASIN 13 31.417.900 12 15.444.172 15.444.172

41BALAI BESAR PELAKSANAAN JALAN NASIONAL VI (SULSEL, SULBAR, SULTRA, SULTENG) DI MAKASAR 8 12.533.178 7 8.585.323 8.585.323BALAI PELAKSANAAN JALAN NASIONAL VIII (BALI,NTB,NTT) DI 

42( , , )

DENPASAR 9 21.428.180 9 20.452.991 22.232.930

43BALAI BESAR PELAKSANAAN JALAN NASIONAL IX (MALUKU & MALUKU UTARA) DI AMBON 1 1.596.725 1 1.229.800 1.229.800

44BALAI BESAR PELAKSANAAN JALAN NASIONAL X (PAPUA DAN IRJABAR) DI JAYAPURA 11 82.412.530 11 52.405.680 82.405.680

45BALAI PELAKSANAAN JALAN NASIONAL XI (GORONTALO DAN SULAWESI UTARA) DI MANADO 32 44.302.551 31 43.025.213 43.025.213PERENCANAAN DAN PENGAWASAN JALAN NASIONAL 

46PROVINSI JABAR 39 67.497.500 39 60.758.467 60.858.911

47PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI JAWATIMUR 42 61.588.000 42 34.293.216 63.393.216

48SNVT PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI SUMATERA UTARA 30 51.468.920 30 49.781.961 63.714.470

49PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI SUMATERA SELATAN 21 21.711.296 19 18.575.044 22.201.924PERENCANAAN DAN PENGAWASAN JALAN NASIONAL

50PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI KALIMANTAN SELATAN 56 47.084.193 56 44.593.441 49.393.230

51PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI SULAWESI SELATAN 26 29.917.395 26 26.535.907 26.535.907

52PELAKSANAAN JALAN NASIONAL WILAYAH II PROPINSI JAWA TENGAH 44 414.295.086 42 394.886.515 463.711.275

53PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI SULAWESI BARAT 14 14.391.403 14 14.391.403 14.391.403

54PERENCANAAN DAN PENGAWASAN JALAN NASIONAL ACEH 31 56.939.290 31 52.561.693 58.455.21554PERENCANAAN DAN PENGAWASAN JALAN NASIONAL ACEH 31 56.939.290 31 52.561.693 58.455.215

56PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI RIAU 28 36.399.760 28 33.966.013 33.966.013

57PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI JAMBI 17 20.032.178 17 18.570.428 18.570.428

58SNVT PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI BENGKULU 16 14.096.152 16 12.752.964 14.233.673

Sandingan Paket Lelang eProcurement dan eMonitoringDitjen Bina Marga

Status Data : 16 September 2013 ; 16:00 WIB

No Satuan Kerja

e‐Procurement e‐Monitoring

PktPagu

Pkt PAGU DIPAPAGU PAKET

(Rp Ribu) (Termasuk MYC)No Satuan Kerja  Pkt Pkt PAGU DIPA(Rp Ribu)  (Termasuk MYC)

59PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI LAMPUNG 25 24.334.981 25 21.827.864 21.827.864

61PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI DI. JOGYAKARTA 10 9.562.000 10 7.913.000 9.298.535

62PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI BALI 27 21.668.277 27 19.555.541 19.354.652

63PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI NUSA TENGGARA BARAT 37 56 245 996 27 42 743 346 42 743 34663PROVINSI NUSA TENGGARA BARAT 37 56.245.996 27 42.743.346 42.743.346

65PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI KALIMANTAN BARAT 56 44.787.380 56 41.961.021 44.211.021

66PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI KALIMANTAN TENGAH 27 38.687.120 27 35.937.807 37.697.626

67PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI KALIMANTAN TIMUR 71 79.167.969 71 72.421.767 72.421.767

69PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI SULAWESI TENGAH 23 31 630 546 23 29 306 876 34 875 29969PROVINSI SULAWESI TENGAH 23 31.630.546 23 29.306.876 34.875.299

70PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI SULAWESI TENGGARA 30 34.348.383 30 32.071.034 32.071.034

71PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI MALUKU 19 34.922.495 19 32.022.925 32.022.925

72PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI PAPUA BARAT 88 88.149.840 70 75.492.490 80.499.790

73PERENCANAAN DAN PENGAWASAN JALAN NASIONAL BALAI IX MALUKU & MALUKU UTARA 17 32 202 310 17 29 956 548 29 956 54873MALUKU & MALUKU UTARA 17 32.202.310 17 29.956.548 29.956.548

76PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI GORONTALO 29 24.079.123 29 23.323.895 23.323.895

77PELAKSANAAN JALAN NASIONAL METROPOLITAN SEMARANG 14 177.673.891 14 169.060.274 169.060.27479PELAKSANAAN JALAN NASIONAL METROPOLITAN MEDAN 8 247.332.340 8 235.119.629 235.119.62980PELAKSANAAN JALAN NASIONAL METROPOLITAN MAKASAR 7 122.321.591 7 119.631.310 185.457.23981PELAKSANAAN JALAN NASIONAL METROPOLITAN DENPASAR 10 158.805.144 10 148.894.187 148.894.187

PERENCANAAN DAN PENGAWASAN JALAN NASIONAL KOTA 82METROPOLITAN JAKARTA 15 28.166.460 15 24.011.143 26.722.14383PELAKSANAAN JALAN NASIONAL METROPOLITAN BANDUNG 10 89.145.983 10 87.289.582 87.289.58284PENANGANAN MENDESAK DAN TANGGAP DARURAT 0 0 0 0 085SEKRETARIAT DIREKTORAT JENDERAL BINA MARGA 4 8.416.193 2 6.696.593 6.696.59386DIREKTORAT BINA TEKNIK 47 94.188.000 47 86.153.147 86.152.14787DIREKTORAT BINA PROGRAM 20 23.384.330 20 22.705.700 22.705.70088PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI ACEH 36 376.921.073 36 303.680.384 422.124.31689PELAKSANA JALAN NASIONAL WILAYAH II PROVINSI ACEH 34 234.596.498 34 202.229.152 202.229.153

90PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI SUMATERA UTARA 29 484.527.860 29 440.703.413 614.636.733

Sandingan Paket Lelang eProcurement dan eMonitoringDitjen Bina Marga

Status Data : 16 September 2013 ; 16:00 WIB

No Satuan Kerja 

e‐Procurement e‐Monitoring

PktPagu

Pkt PAGU DIPAPAGU PAKET

(Rp Ribu)  (Termasuk MYC)91Satker Pelaksanaan Jalan Nasional WIlayah II Provinsi Sumatera Utara 31 446.184.232 29 413.615.544 413.615.54492PELAKSANAAN JALAN BEBAS HAMBATAN MEDAN ‐ KUALANAMU 0 0 0 0 093Pelaksanaan Jalan Nasional Wilayah I Sumatera Barat 30 474.386.709 30 438.272.153 658.030.363

94PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI SUMATERA BARAT 31 367.654.673 31 346.042.325 347.555.969

95Pelaksanaan Jalan Nasional Wilayah I Provinsi Riau 28 501.112.260 21 353.854.580 354.266.85096PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI RIAU 23 324.955.862 23 297.682.552 297.682.55297PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI KEPULAUAN RIAU 29 283.106.386 29 269.849.226 283.814.90098PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI JAMBI 17 133.062.010 17 119.986.087 120.073.13799PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI JAMBI 21 273.516.300 21 248.330.573 248.330.573100Pelaksanaan Jalan Nasional Wilayah I Provinsi Bengkulu 9 51.786.154 9 44.920.523 51.786.154

101SATKER PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI BENGKULU 15 143.952.060 15 128.213.549 202.465.875

102PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI SUMSEL 19 104.947.046 18 88.219.095 88.673.936104PELAKSANAAN JALAN METROPOLITAN PALEMBANG 11 114.236.064 11 103.115.317 110.502.263

SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI 105BANGKA BELITUNG 9 107.947.619 9 105.284.910 105.284.910106PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI BABEL 13 130.755.010 13 126.892.261 126.892.261107PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI LAMPUNG 24 248.717.099 24 228.804.808 228.804.808108PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI LAMPUNG 23 291.633.032 23 254.565.926 285.481.348109PELAKSANAAN JALAN NASIONAL METROPOLITAN I JAKARTA 10 206.060.340 10 182.832.045 182.832.045110PELAKSANAAN JALAN NASIONAL METROPOLITAN III JAKARTA 14 332.177.107 13 264.321.072 264.321.072111PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI BANTEN 11 149.076.890 9 127.285.977 139.076.890112PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI BANTEN 14 232.697.640 14 220.428.105 220.428.105113PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI JABAR 25 292.942.000 25 278.954.747 278.981.232114PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI JABAR 23 983.236.350 23 814.267.226 814.267.226115PELAKSANAAN JALAN BEBAS HAMBATAN CISUMDAWU 0 0 0 0 0116PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI JATENG 28 372.346.735 28 353.828.093 353.828.093117PELAKSANAAN JALAN NASIONAL WILAYAH PROVINSI D.I. YOGYAKARTA 17 241.538.613 17 231.507.138 231.507.138118PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI JATIM 8 114.471.360 8 105.010.127 105.010.127119PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI JATIM 20 321.094.480 10 119.659.885 119.659.885121PELAKSANAAN JALAN NASIONAL WILAYAH I PROV.KALBAR 19 391.625.150 19 340.546.178 351.546.178122PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI KALBAR 12 174.757.900 12 194.416.709 197.658.009123PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI KALBAR 12 345.482.650 12 291.162.887 345.482.650124PELAKSANAAN JEMBATAN TAYAN 0 0 0 0 0125PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI KALTENG 27 301.273.950 27 288.288.803 288.288.803126PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI KALTENG 32 278.863.390 32 266.494.961 435.111.961

127PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI KALIMANTAN TENGAH 22 420.985.730 22 400.694.462 406.467.633

128PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI KALTIM 46 803.873.972 46 739.822.032 739.822.032129PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI KALTIM 12 264.806.880 12 242.305.896 242.305.896130PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI KALTIM 25 744.761.683 25 673.802.492 1.551.930.443131PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI KALSEL 19 242.748.919 19 231.354.786 231.579.063132PELAKSANAAN JALAN NASIONAL WILAYAH II 27 329.387.587 27 316.633.075 328.006.298133PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI BALI 11 257.222.328 11 225.218.384 225.218.384134PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI BALI 5 75.906.885 4 75.523.568 77.342.193

Sandingan Paket Lelang eProcurement dan eMonitoringDitjen Bina Marga

Status Data : 16 September 2013 ; 16:00 WIB

No Satuan Kerja 

e‐Procurement e‐Monitoring

PktPagu

Pkt PAGU DIPAPAGU PAKET

(Rp Ribu)  (Termasuk MYC)135PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI NTB 10 260.846.714 10 242.680.552 242.680.552136PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI NTB 14 309.753.750 13 249.213.039 249.213.039137PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI NTB 19 291.742.640 19 287.601.607 287.601.607138PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI NTT 16 247.099.520 16 239.835.158 239.835.158139Pelaksanaan Jalan Nasional Wilayah II Provinsi NTT 14 299.476.770 14 293.384.569 293.406.489140PELAKSANAAN JALAN NASIONAL WILAYAH IV PROVINSI NTT 10 122.583.180 10 116.727.829 116.752.149141PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI NTT 11 135.082.930 11 132.365.138 132.365.138142PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI SULUT 31 435.703.730 30 398.870.744 398.870.744143PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI SULUT 30 609.510.080 30 609.510.080 749.022.780

144Satuan Kerja Pelaksanaan Jalan Nasional Wilayah III Provinsi Sulawesi Utara (Sangihe ‐ Talaud) 17 146.172.350 17 146.172.350 146.506.600

145Pelaksanaan Jalan Nasional Wilayah Provinsi Gorontalo 26 387.282.620 26 377.647.882 448.525.751146PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI SULTENG 14 187.997.801 14 168.213.429 168.213.429147PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI SULTENG 15 264.911.280 14 246.065.308 246.065.308149PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI SULBAR 5 120.392.540 5 110.566.786 110.566.786150PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI SULBAR 5 98.495.553 5 89.811.274 89.811.274151PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI SULSEL 10 163.545.810 10 160.207.039 210.007.039152PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI SULSEL 24 306.843.449 24 300.596.397 300.596.397

153PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI SULTRA (BARAT) 13 273.241.760 13 264.169.181 264.169.181

154PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI SULTRA (TIMUR) 12 224.594.000 12 210.442.044 210.442.044

155PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI SULTRA (BUTON) 10 157.478.300 10 138.999.478 138.999.478( )

156PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI MALUKU 13 133.450.000 13 128.324.484 128.324.484157PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI MALUKU 20 237.076.840 20 232.236.214 232.236.214158PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI MALUKU 14 196.550.000 14 191.493.471 191.552.596159PELAKSANAAN JEMBATAN MERAH PUTIH 0 0 0 0 0

160PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI MALUKU UTARA 20 345.203.540 20 338.286.688 338.286.688

161PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI MALUKU UTARA 17 212.548.590 17 206.575.422 206.575.422

162Pelaksanaan Jalan Nasional Wilayah I Provinsi Papua (Jayapura) 37 372.032.318 37 331.174.112 358.117.362

163PELAKSANAAN JALAN NASIONAL WILAYAH IX PROVINSI PAPUA (BIAK SERUI) 13 122.688.100 13 121.585.414 122.465.065

164PELAKSANAAN JALAN NASIONAL WILAYAH IV PROVINSI PAPUA (JAYAWIJAYA) 12 189.779.664 12 96.402.176 189.779.664

165PELAKSANAAN JALAN NASIONAL WILAYAH VI PROVINSI PAPUA (TIMIKA) 13 149.429.507 13 142.448.917 142.448.917PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI PAPUA 

166(MERAUKE) 25 272.128.460 25 262.148.307 262.148.307

167PELAKSANAAN JALAN NASIONAL WILAYAH VII PROVINSI PAPUA (NABIRE) 32 361.132.165 32 360.882.345 361.882.345

Sandingan Paket Lelang eProcurement dan eMonitoringDitjen Bina Marga

Status Data : 16 September 2013 ; 16:00 WIB

No Satuan Kerja 

e‐Procurement e‐Monitoring

Pkt

Pagu

Pkt PAGU DIPA

PAGU PAKET

(Rp Ribu) (Termasuk 

MYC)

168PELAKSANAAN JALAN NASIONAL WILAYAH VIII PROVINSI PAPUA (PANIAI) 28 306.943.721 27 298.803.540 298.958.200PELAKSANAAN JALAN NASIONAL WILAYAH III 

169PROVINSI PAPUA (TANAH MERAH) 12 102.034.130 12 98.758.801 196.786.101

170PELAKSANAAN JALAN NASIONAL WILAYAH V PROVINSI PAPUA (PUNCAK JAYA) 14 278.955.178 14 164.965.871 278.677.370

171PELAKSANAAN JALAN NASIONAL WILAYAH V PROVINSI PAPUA BARAT (FAK‐FAK) 16 231.853.746 16 190.772.501 230.498.801

172PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI PAPUA BARAT (SORONG) 27 374.534.370 27 357.987.801 357.987.801

173PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI PAPUA BARAT (MANOKWARI ) 28 156.810.659 28 111.214.372 151.429.472

174PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI PAPUA BARAT (MAYBRAT) 9 54.823.670 9 52.388.053 52.388.053

175PELAKSANAAN JALAN NASIONAL WILAYAH IV PROVINSI PAPUA BARAT (BINTUNI) 18 128.158.900 18 124.253.520 124.253.520

176PERENCANAAN JEMBATAN SELAT SUNDA 4 14.120.000 4 13.345.000 13.345.000177DIREKTORAT BINA PELAKSANAAN WILAYAH I 12 19.100.000 12 17.342.578 17.342.578178DIREKTORAT BINA PELAKSANAAN WILAYAH II 9 11.485.000 9 10.318.203 10.413.267

181PELAKSANAAN JALAN NASIONAL METROPOLITAN II JAKARTA 14 296.908.333 14 263.932.748 263.932.748

182PEMBINAAN ADMINSITRASI DAN PELAKSANAAN PENGENDALIAN PHLN 3 4.100.000 3 3.756.411 3.756.411PELAKSANAAN JALAN BEBAS HAMBATAN SOLO ‐

185KERTOSONO 7 478.196.188 7 449.421.420 449.617.629

187UNIT PENGEMBANGAN KAPASITAS TENAGA KEBINAMARGAAN WILAYAH I 2 900 2 900 2.878.000

188UNIT PENGEMBANGAN KAPASITAS TENAGA KEBINAMARGAAN WILAYAH II 0 0 0 0 0

190PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI KEP. RIAU 12 12.903.290 11 11.463.448 11.463.448Total 3.211 27.581.534.996 3.139 25.008.943.402 27.769.977.873 

REKAPITULASI PROSES LELANG PAKET KONTRAKTUAL TA 2013DI LINGKUNGAN DITJEN BINA MARGASTATUS 16 September 2013 ; 16:00 WIB

dalam ribuandalam ribuan 

KODE SATKER/PAKET PEKERJAAN Pagu 

RPM PLN TOTAL

4447940BALAI BESAR PELAKSANAAN JALAN NASIONAL III (BENGKULU, LAMPUNG, SUMSEL, DAN BABEL) DI PALEMBANG 

1 Pengarsipan Dokumen (PPK Tata Usaha) 650 0 6504447956 BALAI BESAR PELAKSANAAN JALAN NASIONAL IV (BANTEN, DKI, DAN JABAR) DI DKI JAKARTA 

2 Paket Pemagaran BMN 2.000.000 0 2.000.0003 Independent PC Terowongan dan Pemutakhiran Data Cisumdawu 2 500 000 0 2 500 0003 Independent PC Terowongan dan Pemutakhiran Data Cisumdawu 2.500.000 0 2.500.000

4447962 BALAI BESAR PELAKSANAAN JALAN NASIONAL V (JATENG, DIY, JATIM) DI SURABAYA 4 PENGADAAN JEMBATAN RANGKA BAJA DARURAT (BAILLEY) 3.400.000 0 3.400.0005 ‐ [C] PENGADAAN MEUBELAIR 3.000.000 0 3.000.0006 PENGADAAN PERALATAN LABORATORIUM PENGUJIAN BBPJN V 4.462.300 0 4.462.3007 Pengadaan Peralatan Pemeliharaan Jembatan/Toolkit Jembatan 3.511.896 0 3.511.896

4447987 BALAI BESAR PELAKSANAAN JALAN NASIONAL VI (SULSEL, SULBAR, SULTRA, SULTENG) DI MAKASAR 8 PENGADAAN ALAT UJI MUTU LABORATORIUM BBPJN VI MAKASSAR 719.774 0 719.7749 UJI LAIK FUNGSI JALAN NASIONAL 1 035 000 0 1 035 0009 UJI LAIK FUNGSI JALAN NASIONAL 1.035.000 0 1.035.00010 PENGADAAN ALAT SURVEI JALAN DAN JEMBATAN 3.283.126 0 3.283.126

4448013 BALAI BESAR PELAKSANAAN JALAN NASIONAL X (PAPUA DAN IRJABAR) DI JAYAPURA 11 Penyusunan Dokumen Uji Laik Fungsi Jalan Nasional Papua dan Papua Barat 2.851.040 0 2.851.04012 Pembangunan Gedung Kantor Satker‐Satker 19.500.000 0 19.500.00013 Pembangunan Gedung Kantor Balai Tahap IV 5.680.000 0 5.680.00014 Pengawasan Pembangunan Gedung Kantor Satker‐Satker 672.36 0 672.3615 Pengawasan Pembangunan Gedung Kantor Balai Tahap IV 336.18 0 336.18

4471735 PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI JAWATIMUR 16 PENGAWASAN TEKNIK JALAN & JEMBATAN PEMBANGUNAN JALAN PANGARENGAN‐SAMPANG (T.8) 660 0 66017 PENGAWASAN TEKNIK JALAN & JEMBATAN PEMBANGUNAN JALAN ROGUNG ‐ PANGARENGAN (T.9) 780 0 78018 PENGAWASAN TEKNIK JALAN & JEMBATAN PELEBARAN JALAN BTS KAB BANGKALAN ‐ TORJUN (T.7) 765 0 765

19PENGAWASAN TEKNIK JALAN DAN JEMBATAN PELEBARAN JALAN BTS KOTA BANGKALAN ‐ BTS KAB SAMPANG (T.2) 715 0 715

20 PENGAWASAN TEKNIK JALAN & JEMBATAN PELEBARAN JL KETAPANG ‐ BTS KAB PAMEKASAN (T.3) 860 0 86021 SURVEY BMS DI WILAYAH JAWA TIMUR 850 0 85022 PENGAWASAN TEKNIK JALAN DAN JEMBATAN PELEBARAN JALAN SOTABAR ‐ BTS. KAB. SUMENEP (T.1) 650 0 650

23PENGAWASAN TEKNIK JALAN & JEMBATAN PELEBARAN JALAN BTS KAB PEMEKASAN ‐ BTS KOTA SUMENEP (T.6) 760 0 760

24PENGAWASAN TEKNIK JALAN & JEMBATAN PELEBARAN JALAN BTS. BANGKALAN ‐ BTS KAB. SAMPANG II (T.5) 650 0 650

25PENGAWASAN TEKNIK JALAN & JEMBATAN PELEBARAN JALAN BTS. BANGKALAN ‐ BTS KAB. SAMPANG I (T.4) 650 0 650

26 PENGAWASAN TEKNIK JALAN & JEMBATAN PELEBARAN JALAN PAMEKASAN‐SUMENEP (T.10) 660 0 6604471942 PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI SUMATERA UTARA 

27 Paket‐31 Supervisi Natal ‐ Singkuang (Tabuyung)‐ Batu Mundom (MYC) 1.200.000 0 1.200.00028 Paket‐32 Supervisi Bts. Kota Kabanjahe ‐ Kuta Buluh ‐ Lawe Pakam (MYC) 2.400.000 0 2.400.000

REKAPITULASI PROSES LELANG PAKET KONTRAKTUAL TA 2013DI LINGKUNGAN DITJEN BINA MARGASTATUS 16 September 2013 ; 16:00 WIB

dalam ribuan 

KODE SATKER/PAKET PEKERJAAN Pagu 

RPM PLN TOTAL4474981 PELAKSANAAN JALAN NASIONAL WILAYAH II PROPINSI JAWA TENGAH 

29 LEGER JALAN 474.925 0 474.9254485302 PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI SUMATERA BARAT 

30 PAKET ‐ 9 PENGAWASAN PEMBANGUNAN FLY OVER BUKITTINGGI DAN JEMBATAN BUAYAN CS 2.044.977 0 2.044.97731 SURVEY IRMS SEMESTER II (RCS, NAASRA, BB) 324.867 0 324.867

4485386 PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI NUSA TENGGARA BARAT 32 PAKET 28. PENGAWASAN TEKNIK PEMBANGUNAN JEMBATAN KALI JANGKOK CS (APBN‐P) 1.091.109 0 1.091.109

4485412 PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI KALIMANTAN BARAT 33 PAKET 49, PERENCANAAN TEKNIS JEMBATAN 200 m (Tersebar) RUAS JALAN Ng. SILAT ‐ Sp. SEJIRAM 600 0 60034 PAKET 50, PERENCANAAN TEKNIS JEMBATAN 100 m (Tersebar) RUAS JALAN Sp. SEJIRAM‐ PUTUSSIBAU 400 0 400, ( ) p

4485421 PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI KALIMANTAN TENGAH 35 Pengawasan Teknis Peningkatan Struktur Jalan Sei. Hanyu ‐ Tumbang Lahung 777.749 0 777.749

4485437 PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI KALIMANTAN TIMUR 36 PR 23 : KEHANDALAN MODEL JEMBATAN PULAU BALANG TERHADAP UJI ANGIN DINAMIK 2.350.000 0 2.350.000

4485474 PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI MALUKU 37 001. 01 Paket Pengawasan Teknis Jalan di Pulau Yamdena dan Wetar (APBN‐P) 1.275.000 0 1.275.00038 001. 01 Paket Pengawasan Teknis Jalan di Pulau Seram (APBN‐P) 1.766.700 0 1.766.70039 001. 01 Paket Pengawasan Teknis Jalan di Pulau Buru (APBN‐P) 450 0 45039 001. 01 Paket Pengawasan Teknis Jalan di Pulau Buru (APBN P) 450 0 450

4485480 PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI PAPUA BARAT 40 Pembuatan dan Pemasangan Patok Kilometer 2.086.180 0 2.086.180

4488119 PELAKSANAAN JALAN NASIONAL METROPOLITAN SEMARANG 41 PENINGKATAN STRUKTUR JALAN ARTERI UTARA II 1.981.490 0 1.981.490

4488275 PELAKSANAAN JALAN NASIONAL METROPOLITAN MAKASAR 42 Pelebaran Jalan Bts. Kota Maros ‐ Bts. Kab. Bone (Rencana MYC) 36.628.071 0 36.628.071

4495421 PERENCANAAN DAN PENGAWASAN JALAN NASIONAL KOTA METROPOLITAN JAKARTA 43 012 Pengawasan Pembangunan Fly Over Gaplek 619 0 61943 012. Pengawasan Pembangunan Fly Over Gaplek 619 0 619

4495565 PELAKSANAAN JALAN NASIONAL METROPOLITAN BANDUNG 44 Pemeliharaan Berkala Jalan Bts.Kab.Karawang/Purwakarta‐Sadang ( Cikampek ‐ Sadang ) 5.257.915 0 5.257.91545 Pemeliharaan Berkala Jalan Nurtanio ‐ Abdul Rahman Saleh ( Bandung ) 5.357.004 0 5.357.00446 Penanganan Longsoran Ruas Jalan Purwakarta ‐ Cisomang (KM. JKT. 128+900) 4.983.759 0 4.983.759

47Penanganan Longsoran Ruas Jl.Bts.Kota Cileunyi ‐ Nagreg ( Rancaekek ‐ Cileunyi ‐ Cicalengka/Parakan Muncang ) Cs 4.826.535 0 4.826.535

4497029 DIREKTORAT BINA TEKNIK 48 HUMAN TRAFFICKING PREVENTATION AND HIV/AIDS 0 959 95948 HUMAN TRAFFICKING PREVENTATION AND HIV/AIDS 0 959 95949 ROAD SAFETY ENGINEERING SUPPORT FOR RRDP 0 1.440.000 1.440.000

4498574 PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI ACEH 

50Survey dan Investigasi Jalan dan Jembatan Ledger Jalan Uwak (Km.379) ‐ Bts. Aceh Tenggara (Km.415) (Wil.I‐04/2013) 153.805 0 153.805

51 Survey dan Investigasi Jalan dan Jembatan Ledger jalan Bireuen ‐ Bts. Aceh Tengah, CS (Wil.I‐07/2013) 88.89 0 88.8952 Survey dan Investigasi Jalan dan Jembatan Ledger Jalan A. Majid Ibrahim (Langsa) CS (Wil.I‐06/2013) 90.515 0 90.51553 Survey dan Investigasi Jalan dan Jembatan Ledger Jalan Blangkejeren ‐ Laweaunan (Wil.I‐05/2013) 179.5 0 179.5

4498576 PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI SUMATERA UTARA4498576 PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI SUMATERA UTARA 

54Penanganan Bencana Alam Ruas Jalan Bts. Kota P. Siantar‐Parapat (Link. 065) dan Ruas Jalan Parapat‐Bts. Kab. Tapanuli Utara (Link. 066) 4.413.046 0 4.413.046

55 Penanganan Pasca Bencana Alam Ruas Jalan Bts. Kab. Tanah Karo ‐ Panji 4.051.000 0 4.051.00056 Peningkatan Kapasitas/Pelebaran Jalan Kutabuluh ‐ Lawe Pakam (UMYC) 51.202.220 0 51.202.22057 Peningkatan Kapasitas/Pelebaran Jalan Kabanjahe ‐ Kutabuluh (UMYC) 66.752.220 0 66.752.220

REKAPITULASI PROSES LELANG PAKET KONTRAKTUAL TA 2013DI LINGKUNGAN DITJEN BINA MARGASTATUS 16 September 2013 ; 16:00 WIB

dalam ribuan 

KODE SATKER/PAKET PEKERJAAN Pagu 

RPM PLN TOTAL4498579 PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI SUMBAR 

58 PEMBANGUNAN FLY OVER BUKITTINGGI 29.952.700 0 29.952.70059 PEMBANGUNAN/DUPLIKASI JEMBATAN DI KAW. STRATEGIS JEMBATAN BUAYAN CS 24.956.340 0 24.956.340

4498584 PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI RIAU 60 PEMELIHARAAN BERKALA JEMBATAN SEI. TIMEK 1.100.000 0 1.100.000

4498585 PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI KEPULAUAN RIAU 61 Pemeliharaan Berkala Jembatan RH.Fisabilillah 008.001.0.16 6.388.120 0 6.388.120

4498590 PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI SUMSEL 62 Berkala Jembatan Lilin 5.880.120 0 5.880.12063 Berkala Jembatan Lalan 5.880.120 0 5.880.120

4498600 PELAKSANAAN JALAN NASIONAL METROPOLITAN III JAKARTA 64 PENANGANAN LONGSOR RUAS JALAN PUNCAK‐BTS.KOTA CIANJUR (CILOTO) 5.483.447 0 5.483.44765 ‐ PENINGKATAN JL. BTS. KOTA JASINGA ‐ BTS. KOTA LEUWILIANG (LANJUTAN) 23.476.340 0 23.476.340

4498603 PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI BANTEN 66 Rekonstruksi/ Peningkatan Struktur Jalan Bts. Kota Pandeglang ‐ Bts. Kota Rangkasbitung (Retender) 14.980.068 0 14.980.068

4498604 PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI BANTEN 67 Pemeliharaan Berkala/Rehabilitasi Jembatan Binuangeun CS (Retender) 6.433.200 0 6.433.200

4498605 PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI JABAR 68 PAKET PEMELIHARAAN BERKALA JALAN TANJUNGSARI ‐ SUMEDANG ‐ CIJELAG 3.475.000 0 3.475.00068 PAKET PEMELIHARAAN BERKALA JALAN TANJUNGSARI  SUMEDANG  CIJELAG 3.475.000 0 3.475.00069 PENANGANAN AMBLESAN PRABU GAJAH AGUNG 3.402.000 0 3.402.00070 PENANGANAN AMBLESAN SUMEDANG ‐ CIJELAG 2 2.195.000 0 2.195.000

4498622 PELAKSANAAN JALAN NASIONAL WILAYAH PROVINSI D.I. YOGYAKARTA 71 Rekonstruksi Pasca Bencana Jalan Arteri Selatan (Yogyakarta) Ruas 007.11.K 4.913.233 0 4.913.233

4498633 PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI KALBAR 72 Sosok ‐Tayan, Tanjung ‐ Sanggau (30‐RCP01) 21.124.400 35.117.000 56.241.40073 Peningkatan Struktur Jalan Sanggau ‐ Sekadau 10.000.000 0 10.000.000

4498634 PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI KALBAR4498634 PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI KALBAR 74 Peningkatan Struktur Jalan Sp. Semangut ‐ Putussibau 19.985.160 0 19.985.160

4498638 PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI KALTENG 75 PENINGKATAN STRUKTUR JALAN SEI. HANYU ‐ TUMBANG LAHUNG (PAKET PBC)(MYC) 28.156.000 0 28.156.000

4498640 PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI KALTIM 76 LONGSORAN KM 8 + 000 BALIKPAPAN 9.708.291 0 9.708.29177 LONGSORAN KM 4+500 BALIKPAPAN 14.407.700 0 14.407.700

REKAPITULASI PROSES LELANG PAKET KONTRAKTUAL TA 2013DI LINGKUNGAN DITJEN BINA MARGADI LINGKUNGAN DITJEN BINA MARGASTATUS 16 September 2013 ; 16:00 WIB

dalam ribuan 

KODE SATKER/PAKET PEKERJAAN Pagu 

RPM PLN TOTAL4498642 PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI KALTIM 

78 PPK‐19 SP. 3 APAS ‐ SIMANGGARIS (SECTION 1) 19.566.760 39.607.000 59.173.76079 PPK‐19 SP.3 APAS ‐ SIMANGGARIS (SECTION 2) SIMANGGARIS ‐ BORDER 24.690.759 63.362.000 88.052.75980 PPK‐16 TANJUNG SELOR ‐ TANJUNG PALAS TANJUNG PALAS ‐ SEKATAK (SECTION 1) 12 969 133 27 979 000 40 948 13380 PPK 16 TANJUNG SELOR  TANJUNG PALAS, TANJUNG PALAS  SEKATAK (SECTION 1) 12.969.133 27.979.000 40.948.13381 PPK‐16 TANJUNG PALAS ‐ SEKATAK (SECTION 2) 13.056.687 28.515.000 41.571.687

4498644 PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI KALSEL 82 PEMBANGUNAN JEMBATAN SEI. BASIRIH (MYC) 34.982.850 0 34.982.850

4498650 PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI NTB 83 PEMBANGUNAN JEMBATAN KALI JANGKOK (APBNP‐NP) 23.980.580 0 23.980.58084 PEMBANGUNAN JEMBATAN AWANG 2 (APBNP‐NP) 18.010.580 0 18.010.58085 PEMBANGUNAN JALAN SP.PENGANTAP‐MT.AJAN‐KUTA (APBNP‐NP) 22.730.580 0 22.730.580

4498651 PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI NTB4498651 PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI NTB 86 PEL. JALAN SP. NEGARA ‐ TALIWANG 01 (PEMBAYARAN TUNGGAKAN) (05) 2.575.705 0 2.575.70587 PEMEL. BERKALA JALAN SP. NEGARA ‐ BTS. KOTA SUMBAWA BESAR (PEMBAYARAN TUNGGAKAN)(06) 6.987.983 0 6.987.983

4498652 PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI NTB 88 PELEBARAN JALAN TALABIU ‐ BATAS KOTA BIMA (PPK 09) APBNP 17.580.580 0 17.580.58089 PEL. KAWASAN STRATEGIS JALAN HUU ‐ PARADO (PPK 08) APBNP 13.380.580 0 13.380.58090 PEL. KAWASAN STRATEGIS JALAN KEMPO ‐ KESI ‐ HODO 01 (PPK 08) APBNP 20.130.580 0 20.130.58091 KAWASAN STRATEGIS JALAN KEMPO ‐ KESI ‐ HODO 02 (PPK 10) APBNP 13.480.580 0 13.480.58092 PEL KAWASAN STRATEGIS JALAN KEMPO KESI HODO 03 (PPK 09) APBNP 13 480 580 0 13 480 58092 PEL. KAWASAN STRATEGIS JALAN KEMPO ‐ KESI ‐ HODO 03 (PPK 09) APBNP 13.480.580 0 13.480.58093 PELEBARAN JALAN RABA ‐ SAPE (PPK 10) APBNP 17.200.580 0 17.200.580

4498659 PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI SULUT 94 PELEBARAN JALAN PINOLOSIAN ‐ ONGGUNOI ‐MOLOBOG (USULAN MYC) (PPK 10) 48.473.000 0 48.473.000

4498660 PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI SULUT (SANGIHE TALAUD) 95 Peningkatan Struktur Jalan Melonguane ‐ Rainis (APBNP ‐ NP) 9.978.300 0 9.978.300

4498662 PELAKSANAAN JALAN NASIONAL WILAYAH PROVINSI GORONTALO 96 Paket Pelebaran Jalan Marisa ‐ Lemito ‐Molosipat (MYC) 47.974.600 0 47.974.60097 Paket Pelebaran Jalan Tolango ‐ Paguyaman (MYC) 37.974.600 0 37.974.600

4498674 PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI MALUKU 98 Pembangunan Jalan Modanmohe ‐ Namrole (APBN‐P) 29.515.625 0 29.515.625

4498675 PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI MALUKU 99 Pelebaran Jalan Latu ‐ Liang (APBNP‐NP) 24.607.100 0 24.607.100100 Pelebaran Jalan Saleman ‐Waipia (APBNP‐NP) 14.757.100 0 14.757.100101 Peningkatan Struktur Jalan Bula ‐ Dawang ‐Waru ( APBNP‐NP ) 9.834.800 0 9.834.800102 Pelebaran Jalan Liang ‐ Latu (APBNP‐NP) 24.607.100 0 24.607.100103 Pelebaran Jalan Banggoi ‐ Bula (APBNP‐NP) 19.682.100 0 19.682.100104 Pelebaran Jalan Waipia ‐ Saleman (APBNP‐NP) 24.607.100 0 24.607.100

REKAPITULASI PROSES LELANG PAKET KONTRAKTUAL TA 2013DI LINGKUNGAN DITJEN BINA MARGASTATUS 16 September 2013 ; 16:00 WIB

dalam ribuan Pagu 

KODE SATKER/PAKET PEKERJAAN g

RPM PLN TOTAL4498676 PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI MALUKU 105 PENINGKATAN STRUKTUR JALAN ARUIDAS ‐ SAUMLAKI (APBNP‐NP) 9.749.375 0 9.749.375106 PENINGKATAN STRUKTUR JALAN ILWAKI ‐ LURANG (APBN‐P) 29.442.125 0 29.442.125107 PENINGKATAN STRUKTUR JALAN SIWAHAN ‐ ARMA (APBNP‐NP) 9.749.375 0 9.749.375108 PENINGKATAN STRUKTUR JALAN ARMA ‐ ARUIDAS (APBNP‐NP) 34.367.125 0 34.367.125

4498681 PELAKSANAAN JALAN NASIONAL WILAYAH IX PROVINSI PAPUA (BIAK SERUI) 109 PEMBANGUNAN JALAN MARIOROTO ‐ ANSUS ‐WOI 14.988.900 0 14.988.900109 PEMBANGUNAN JALAN MARIOROTO  ANSUS  WOI 14.988.900 0 14.988.900110 PEMBANGUNAN JALAN YOBI ‐WODA 9.990.600 0 9.990.600111 PEMBANGUNAN JALAN SAUBEBA ‐ PELABUHAN YOBI 4.991.900 0 4.991.900112 PEMBANGUNAN JALAN WOI ‐ POOM 9.990.600 0 9.990.600113 PENINGKATAN JALAN SAUBEBA ‐MENAWI DAN PENANGANAN LONGSORAN 19.988.900 0 19.988.900114 PENINGKATAN JALAN SUMBERBABA ‐ RANDAWAYA 9.990.600 0 9.990.600115 PEMBANGUNAN JALAN LINGKAR ABABIADI ‐MURDORI (WARDO‐DUBER‐SORENDIWERI KORIDO) 19.988.900 0 19.988.900

4498685 PELAKSANAAN JALAN NASIONAL WILAYAH VII PROVINSI PAPUA (NABIRE) 116 Pembangunan Jalan Baru Nabire‐Lagari‐Wapoga (APBNP‐NP) 9 983 680 0 9 983 680116 Pembangunan Jalan Baru Nabire Lagari Wapoga (APBNP NP) 9.983.680 0 9.983.680117 Rekonstruksi Peningkatan Struktur Jalan Nabire‐Topo (APBNP‐NP) 12.480.580 0 12.480.580118 Rekonstruksi /Peningkatan Ruas Jalan Topo‐Nabire (APBNP‐NP) 12.480.580 0 12.480.580119 Rekonstruksi /Peningkatan Ruas Jalan Topo‐Nabire (APBNP‐NP) 14.980.580 0 14.980.580120 Pembangunan Jalan Wanggar ‐ Yaur (APBNP‐DP) 19.980.580 0 19.980.580121 Pembangunan Jalan Lagari‐Napan ‐Wapoga (APBNP‐DP) 9.983.680 0 9.983.680122 Penanganan Mendesak Pasca Bencana Longsoran Jalan Ruas Bedudipa Batas Kota Nabire 30.299.235 0 30.299.235123 Penggantian Jembatan Rombe (APBNP‐NP) 5.983.680 0 5.983.680124 Penggantian Jembatan Mahmud (APBNP‐NP) 3 986 030 0 3 986 030124 Penggantian Jembatan Mahmud (APBNP‐NP) 3.986.030 0 3.986.030

4498687 PELAKSANAAN JALAN NASIONAL WILAYAH VIII PROVINSI PAPUA (PANIAI) 125 PENINGKATAN STRUKTUR JALAN MOANEMANI‐WAGETE‐TIMIKA (APBN‐P) 12.730.580 0 12.730.580

4498691 PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI PAPUA BARAT (SORONG) 126 Pembangunan Jembatan Mega 2 (Wonai) 5.186.030 0 5.186.030127 Lanjutan Pembangunan Jalan Lingkar Raja Ampat (APBN‐P) 8.983.680 0 8.983.680128 Pembangunan Jalan Klasam (APBN‐P) 5.483.680 0 5.483.680129 Penanganan Longsoran Bts. Kota Sorong‐Klamono (APBN‐P) 5.983.680 0 5.983.680130 Penanganan Jalan Sorong Makbon (Peningkatan) APBN P 5 186 030 0 5 186 030130 Penanganan Jalan Sorong‐Makbon (Peningkatan) APBN‐P 5.186.030 0 5.186.030131 Lanjutan Pembangunan Jembatan Klabala Sorong (APBN‐P) 5.186.030 0 5.186.030132 Peningkatan Jalan Makbon‐Mega (APBN‐P) 5.186.030 0 5.186.030133 Peningkatan Struktur Jalan Bts. Kab. Sorsel‐Kambuaya (APBN‐P) 9.983.680 0 9.983.680134 Peningkatan Jalan Rufei‐Sauka (APBN‐P) 5.186.030 0 5.186.030

4498695 PELAKSANAAN JALAN NASIONAL WILAYAH IV PROVINSI PAPUA BARAT (BINTUNI) 135 PEMBANGUNAN JALAN BINTUNI‐SUSUMUK (UP4B) 9.491.100 0 9.491.100136 PEMBANGUNAN JALAN MAMEH‐WINDESI (UP4B) 18.989.400 0 18.989.400137 PEMBANGUNAN JALANWINDESI BOFUWER (APBN P) 5 185 000 0 5 185 000137 PEMBANGUNAN JALAN WINDESI ‐ BOFUWER (APBN‐P) 5.185.000 0 5.185.000138 PEMBANGUNAN JALAN YAUR ‐ YAMOR (APBN‐P) 5.185.000 0 5.185.000139 PEMBANGUNAN JALAN WASIOR ‐WINDESI (APBN‐P) 5.185.000 0 5.185.000140 PENINGKATAN STRUKTUR JALAN BINTUNI‐MAMEH (UP4B) 18.989.400 0 18.989.400

4498708 DIREKTORAT BINA PELAKSANAAN WILAYAH II 141 Alat Pengolah Data 285 0 285

REKAPITULASI PROSES LELANG PAKET KONTRAKTUAL TA 2013DI LINGKUNGAN DITJEN BINA MARGASTATUS 16 September 2013 ; 16:00 WIB

dalam ribuan 

KODE SATKER/PAKET PEKERJAAN Pagu 

RPM PLN TOTAL4498781 PELAKSANAAN JALAN NASIONAL METROPOLITAN II JAKARTA 142 Pembangunan Flyover Gaplek 48.332.850 0 48.332.850143 Paket Penanganan Pasca Banjir Jembatan Tiga 5.498.459 0 5.498.459144 Paket Penanganan Pasca Banjir Daan Mogot 17.431.554 0 17.431.554

4501303 PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI PAPUA 145 Pengawasan Teknis Pembangunan Jalan Marioroto ‐ Ansus ‐Woi 996.4 0 996.4146 Pengawasan Teknis Peningkatan Jalan Sumber Baba ‐ Randawaya 996.4 0 996.4147 Pengawasan Teknis Pembangunan Jalan Lingkar Ababiadi ‐Murdori 1.095.450 0 1.095.450148 Pengawasan Teknis Pembangunan Jalan Woi ‐ Poom 996.4 0 996.4149 Pengawasan Teknis Jalan dan Jembatan Jayapura 1 (APBN‐P) 827.47 0 827.47150 Pengawasan Teknis Jalan dan Jembatan Nabire 1 (APBN‐P) 934.844 0 934.844151 Perencanaan Teknis Jembatan Yetti ‐ Ubrub 746.4 0 746.4152 Perencanaan Teknis Jembatan Kimibay ‐ Lagari 796.4 0 796.4153 Pengawasan Teknis Pembangunan Jalan Yobi ‐Woda 996.4 0 996.4154 Perencanaan Teknis Jalan Kawor ‐ Oksibil 846.4 0 846.4155 Pengawasan Teknis Jalan dan Jembatan Paniai 1 (APBN‐P) 476.886 0 476.886g ( )156 Perencanaan Teknis Jalan Dawai ‐Waindu (Lingkar Yapen) 696.4 0 696.4157 Perencanaan Teknis Jalan Suru suru ‐ Obio ‐ Dekai 1.027.950 0 1.027.950158 Perencanaan Teknis Jalan Mamugu ‐ Batas Batu 776.4 0 776.4159 Pengawasan Teknis Peningkatan Jalan Dekai ‐ Logpond 1.095.450 0 1.095.450160 Pengawasan Teknis Peningkatan Jalan Logpond ‐ Suator ‐ Patippi 1.095.450 0 1.095.450161 Pengawasan Teknis Peningkatan Jalan Karubaga ‐Mulia 1.095.450 0 1.095.450162 Pengawasan Teknis Pembangunan Jalan Dekai ‐ Sumohai 1.095.450 0 1.095.450163 Pengawasan Teknis Pembangunan Jalan Lagari ‐ Napan ‐Wapoga 1.095.450 0 1.095.450163 Pengawasan Teknis Pembangunan Jalan Lagari  Napan  Wapoga 1.095.450 0 1.095.450164 Pengawasan Teknis Pembangunan Jalan Wanggar ‐ Yaur 1.095.450 0 1.095.450165 Perencanaan Teknis Jembatan Lagari ‐ Siriwo 946.4 0 946.4166 Perencanaan Teknis Jalan Merauke ‐ Jagebob ‐ Erambu 996.4 0 996.4167 Perencanaan Teknis Jalan Wanggar‐ Yaur ‐ Kwatisore 796.4 0 796.4168 Perencanaan Teknis Jalan Saubeba ‐ Rosbori (Lingkar Yapen) 696.4 0 696.4169 Perencanaan Teknis Jalan Sarmi ‐ Kasonaweja 846.4 0 846.4170 Perencanaan Teknis Jalan Rosbori ‐Menggui ‐ Poom (Lingkar Yapen) 696.4 0 696.4171 Perencanaan Teknis Jalan Habema ‐ Tiom 516 4 0 516 4171 Perencanaan Teknis Jalan Habema  Tiom 516.4 0 516.4172 Perencanaan Teknis Jalan Sumber Baba ‐ Randawaya 696.4 0 696.4173 Perencanaan Teknis Jalan Kawor ‐Waropko 846.4 0 846.4174 Perencanaan Teknis Jalan SP 3 Gesa ‐ Barapasi ‐ Bts. Waropen 846.4 0 846.4175 Perencanaan Teknis Jalan Botawa ‐Wapoga 846.4 0 846.4176 Perencanaan Teknis Jalan Wanam ‐ Nakias ‐ Kaliki 996.4 0 996.4177 Pengawasan Teknis Peningkatan Jalan Saubeba ‐Menawi + Penanganan Longsoran 1.095.450 0 1.095.450178 Pengawasan Teknis Pembangunan Jalan Saubeba ‐ Pelabuhan Yobi 546.4 0 546.4179 Perencanaan Teknis Jalan Lagari ‐Wapoga 931 4 0 931 4179 Perencanaan Teknis Jalan Lagari ‐Wapoga 931.4 0 931.4180 Perencanaan Teknis Jalan Kenyam ‐ Gearek 1.027.950 0 1.027.950

4648080 UNIT PERALATAN DAN PENGUJIAN CIKAMPEK 181 Pengadaan Meubelair 475 0 475

4654624 UNIT PENGEMBANGAN KAPASITAS TENAGA KEBINAMARGAAN WILAYAH I 182 Rehabilitasi Atap Gedung II 300 0 300

TOTAL 1.604.093.052 196.979.000 1.801.072.052

REKAPITULASI BELUM LELANG PAKET KONTRAKTUAL TA 2013DI LINGKUNGAN DITJEN BINA MARGASTATUS 16 September 2013 ; 16:00 WIB

dalam ribuan 

KODE SATKER/PAKET PEKERJAANPagu 

RPM PLN TOTALKODE SATKER/PAKET PEKERJAAN  RPM PLN TOTAL4440357 INVENTARISASI DAN PENGADAAN LAHAN 

1 BANTUAN HUKUM PENGADAAN TANAH JALAN TOL 500 0 5004447925 BALAI BESAR PELAKSANAAN JALAN NASIONAL I (NAD,SUMUT) DI MEDAN 

2 Renovasi Halaman Parkir 50 0 503 Pengadaan Bahan UPCA 3.630.630 0 3.630.6304 Renovasi Gudang Arsip 50 0 505 Pengadaan AC Standing 51.321 0 51.3216 P d M b l i R R t BBPJN I 200 0 2006 Pengadaan Meubelair Ruang Rapat BBPJN I 200 0 2007 Pemasangan Pagar dan Halaman Kantor BBPJN I 200 0 2008 Pembuatan Patok Pengaman Aset Negara 190 0 190

4447931BALAI BESAR PELAKSANAAN JALAN NASIONAL II (SUMBAR, JAMBI, RIAU, KEP. RIAU) DI PADANG 

9 PENGADAAN KENDARAAN BERMOTOR 750 0 750

4447956BALAI BESAR PELAKSANAAN JALAN NASIONAL IV (BANTEN, DKI, DAN JABAR) DI DKI JAKARTA 

10 P k P l P k 8 197 000 0 8 197 00010 Paket Peralatan Pengangkut 8.197.000 0 8.197.00011 Paket Peralatan PEngeruk 5.236.000 0 5.236.00012 PENGENDALIAN DAN PENANGGULANGAN BENCANA YANG BERDAMPAK PADA JALAN 650 0 65013 Paket Peralatan Penunjang 3.358.000 0 3.358.00014 Paket Peralatan Pemadat 5.961.000 0 5.961.00015 PAket Peralatan Survey 788.575 0 788.57516 Paket Peralatan Operasional 5.141.000 0 5.141.000

BALAI BESAR PELAKSANAAN JALAN NASIONAL VII (KALBAR, KALTENG, KALSEL DAN )4447971 KALTIM) DI BANJARMASIN 

17 Paket Pengawasan Pelebaran Tebelian ‐ Sp. Nanga Silat (Grant Jepang) 0 100 100

4447987BALAI BESAR PELAKSANAAN JALAN NASIONAL VI (SULSEL, SULBAR, SULTRA, SULTENG) DI MAKASAR 

18 PERALATAN PEMELIHARAAN JEMBATAN PSP3 2.042.846 0 2.042.846

4448015BALAI PELAKSANAAN JALAN NASIONAL XI (GORONTALO DAN SULAWESI UTARA) DI MANADO PENGAWASAN TEKNIS PENGAMANAN ASET JALAN TOL MANADO‐BITUNG (LAND 

19 CLEARING) 135 0 13520 PENYUSUNAN SOP KETATAUSAHAAN BPJN XI 850.633 0 850.63321 PENGAMANAN ASET JALAN TOL MANADO‐BITUNG (LAND CELARING) 2.986.820 0 2.986.820

4471662 PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI JABAR 

22PW‐5/2013 ‐Metropolitan, Pengawasan / Supervisi Konstruksi Jalan dan Jembatan Metropolitan Bandung 50 0 50

4474981 PELAKSANAAN JALAN NASIONAL WILAYAH II PROPINSI JAWA TENGAH 23 PNKT. STRUKTUR JALAN JLN. DAN JBT. JALUR JUANA LAMA (LANJUTAN) 3.481.163 0 3.481.16324 GIRIWOYO ‐ DUWET (RRDP) 7.262.269 10.716.103 17.978.372

25PELEBARAN JALAN BTS. SEMARANG BRT./SKA. BRT‐BTS. KOTA BOYOLALI (BOYOLALI‐SALATIGA) (SKA. BRT.) (LANJUTAN) 302.892 0 302.892

26 JEMBATAN KALIORI, Cs (LANJUTAN) 282.561 0 282.5614485355 PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI JAWA TENGAH 

27 Paket 30 ‐ Pengawasan Teknik Jalan Weleri ‐ Bts. Kota Kendal 50 0 50

REKAPITULASI BELUM LELANG PAKET KONTRAKTUAL TA 2013DI LINGKUNGAN DITJEN BINA MARGASTATUS 16 September 2013 ; 16:00 WIB

dalam ribuan Pagu 

KODE SATKER/PAKET PEKERJAAN g

RPM PLN TOTAL4485361 PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI DI. JOGYAKARTA 

28 Paket 13: Perencanaan Lansekap Fly Over Jombor (Yogyakarta) 188 0 18829 Paket 12: Perencanaan Drainase Jalan Lingkar Utara (Yogyakarta) 192.1 0 192.1

4485386PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI NUSA TENGGARA BARAT 

30 PAKET 34. PENGAWASAN TEKNIK PELEBARAN JALAN KEMPO ‐ KESI ‐ HODO 01 (APBN‐P) 1.121.909 0 1.121.90931 PAKET 35. PENGAWASAN TEKNIK PELEBARAN JALAN KEMPO ‐ KESI ‐ HODO 02 (APBN‐P) 1.121.909 0 1.121.90931 PAKET 35. PENGAWASAN TEKNIK PELEBARAN JALAN KEMPO  KESI  HODO 02 (APBN P) 1.121.909 0 1.121.90932 PAKET 36. PENGAWASAN TEKNIK PELEBARAN JALAN KEMPO ‐ KESI ‐ HODO 03 (APBN‐P) 1.121.909 0 1.121.909

33PAKET 33. PENGAWASAN TEKNIK PELEBARAN JALAN RABA ‐ SAPE DAN TALABIU ‐ BTS. KOTA BIMA (APBN‐P) 1.322.437 0 1.322.437

34 PAKET 32. PENGAWASAN TEKNIK PELEBARAN JALAN SBW BESAR ‐ SP. NEGARA 01 (APBN‐P) 1.167.265 0 1.167.265

35PAKET 31. PENGAWASAN TEKNIK PEMBANGUNAN JALAN LENDANGGUAR ‐ LUNYUK (APBN‐P) 831.474 0 831.474

36 PAKET 30. PENGAWASAN TEKNIK PEMBANGUNAN JALAN SEJORONG ‐ TETAR (APBN‐P) 831.474 0 831.47437 PAKET 37. PENGAWASAN TEKNIK PELEBARAN JALAN HU'U ‐ PARADO (APBN‐P) 788.821 0 788.82137 PAKET 37. PENGAWASAN TEKNIK PELEBARAN JALAN HU U  PARADO (APBN P) 788.821 0 788.82138 PAKET 27. PENGAWASAN TEKNIK PEMBANGUNAN JEMBATAN AWANG 2 (APBN‐P) 1.091.109 0 1.091.109

39PAKET 29. PENGAWASAN TEKNIK PEMBANGUNAN JALAN SP. PENGANTAP ‐MT. AJAN ‐KUTA (APBN‐P) 857.276 0 857.276

4485474 PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI MALUKU 40 001.01. Perencanaan Patok Kilometer di Pulau Ambon dan Ruas Kairatu ‐ SP. Waipia 697.224 0 697.22441 001.01. Perencanaan Teknis Jalan Dawang ‐Waru ‐ Kufar 467.304 0 467.304

4488131 PELAKSANAAN JALAN NASIONAL METROPOLITAN I SURABAYA 42 Paket Pengadaan Pemasangan dan Pemeliharaan SHMS Jembatan Suramadu 3 601 435 0 3 601 43542 Paket Pengadaan, Pemasangan dan Pemeliharaan SHMS Jembatan Suramadu 3.601.435 0 3.601.43543 PAKET PELEBARAN JALAN RAYA MARGOMULYO (SURABAYA) 3.984.000 0 3.984.000

4488301 PELAKSANAAN JALAN NASIONAL METROPOLITAN DENPASAR 

44PPK‐07 Simpang Sanur‐Simpang Tohpati‐Sakah EBL‐01 Tohpati‐Kusamba (Retensi), EBL‐02 (Eskalasi) 1.128.848 0 1.128.848

4495421 PERENCANAAN DAN PENGAWASAN JALAN NASIONAL KOTA METROPOLITAN JAKARTA 45 013. Pengawasan Pembangunan Underpass Bulak Kapal 455 0 455

4495565 PELAKSANAAN JALAN NASIONAL METROPOLITAN BANDUNG 46 PAKET PEMBANGUNAN FLY OVER KOPO (BANDUNG) 984 0 98446 PAKET PEMBANGUNAN FLY OVER KOPO (BANDUNG) 984 0 984

4497004 PENANGANAN MENDESAK DAN TANGGAP DARURAT 47 PENANGGULANGAN BENCANA ALAM RUAS JALAN SIDIKALANG‐KOTABULUH II 1.532.214 0 1.532.214

48PAKET PERBAIKAN/PENANGGULANGAN KERUSAKAN AKIBAT BENCANA ALAM RUAS JALAN KM. 125 ‐ KM. 180 ( N.028) 3.171.650 0 3.171.650

49 PENANGGULANGAN BENCANA ALAM BANJIR BANDANG JBT.AEK RANTOPURAN 6.243.524 0 6.243.524

50PENANGGULANGAN BENCANA ALAM RUAS JALAN BTS PROV NAD‐SARAGIH‐MANDUAMAS‐BARUS STA.90+350 4.615.690 0 4.615.690

51 PENANGGULANGAN BENCANA ALAM RUAS JALAN BTS BARUS BTS KOTA SIBOLGA 2 058 904 0 2 058 90451 PENANGGULANGAN BENCANA ALAM RUAS JALAN BTS BARUS‐BTS KOTA SIBOLGA 2.058.904 0 2.058.90452 Penanganan Pasca Bencana Alam Ruas Jalan Bts. Kab. Tanah Karo ‐ Panji 4.051.000 0 4.051.000

53PENANGGULANGAN BENCANA ALAM RUAS JALAN BTS PROV NAD‐SARAGIH‐MANDUAMAS‐BARUS STA. 102+250‐102+900 7.241.449 0 7.241.449

54 Penanganan Longsoran Pada Ruas Jalan Pandeglang ‐ Saketi 2.359.700 0 2.359.70055 PENANGGULANGAN BENCANA ALAM RUAS JALAN BTS KOTA TARUTUNG‐BTS KAB TAPTENG 5.709.705 0 5.709.705

REKAPITULASI BELUM LELANG PAKET KONTRAKTUAL TA 2013DI LINGKUNGAN DITJEN BINA MARGASTATUS 16 September 2013 ; 16:00 WIB

dalam ribuan Pagu 

KODE SATKER/PAKET PEKERJAAN g

RPM PLN TOTAL4497004 PENANGANAN MENDESAK DAN TANGGAP DARURAT 

56 PENANGGULANGAN BENCANA ALAM RUAS JALAN SIDIKALANG‐KOTABULUH I 3.189.215 0 3.189.21557 LONGSORAN KM 4+500 BALIKPAPAN 14.407.000 0 14.407.00058 LONGSORAN KM 8 + 000 BALIKPAPAN 9.708.991 0 9.708.99159 PENANGGULANGAN BENCANA ALAM RUAS JALAN BTS TAPSEL I/II 5.862.426 0 5.862.426

60Penanganan Bencana Alam Ruas Jalan Bts. Kota P. Siantar‐Parapat (Link. 065) dan Ruas Jalan Parapat‐Bts. Kab. Tapanuli Utara (Link. 066) 4.413.046 0 4.413.04660 Ja a a apat ts ab apa u Uta a ( 066) 3 0 6 0 3 0 6

61 PENANGGULANGAN BENCANA ALAM RUAS JALAN JEMBATAN MERAH‐RANJAU BATU 3.940.915 0 3.940.915

62PENANGGULANGAN BENCANA ALAM RUAS JALAN BTS KAB TAPUT‐KOTA SIBOLGA‐KOTA P.SIDEMPUAN 5.597.589 0 5.597.589

63 Paket Penanganan Pasca Banjir Jembatan Tiga 5.498.459 0 5.498.45964 PENANGANAN LONGSOR RUAS JALAN PUNCAK‐BTS.KOTA CIANJUR (CILOTO) 5.483.447 0 5.483.44765 Paket Penanganan Pasca Banjir Daan Mogot 17.431.554 0 17.431.55466 PENANGGULANGAN BENCANA ALAM RUAS JALAN BTS TAPUT ‐ SIPIROK 4.790.338 0 4.790.33867 Penanganan Longsoran Ruas Jalan Purwakarta ‐ Cisomang (KM. JKT. 128+900) 4.983.759 0 4.983.75967 Penanganan Longsoran Ruas Jalan Purwakarta  Cisomang (KM. JKT. 128+900) 4.983.759 0 4.983.759

68Penanganan Longsoran Ruas Jl.Bts.Kota Cileunyi ‐ Nagreg ( Rancaekek ‐ Cileunyi ‐Cicalengka/Parakan Muncang ) Cs 4.826.535 0 4.826.535

69 Penanganan Mendesak Pasca Bencana Longsoran Jalan Ruas Bedudipa Batas Kota Nabire 30.299.235 0 30.299.235

70PENANGANAN MENDESAK DAN TANGGAP DARURAT BENCANA ALAM RUAS JALAN BEDUDIPA‐MOANEMANI 7.599.500 0 7.599.500

4497029 DIREKTORAT BINA TEKNIK 71 PENGADAAN ALAT UJI JEMBATAN 1.800.000 0 1.800.000

4497035 DIREKTORAT BINA PROGRAM4497035 DIREKTORAT BINA PROGRAM 72 Peningkatan Peralatan Kendaraan Survai Kondisi dan Lingkungan Jalan 3.500.000 0 3.500.000

4498575 PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI ACEH 73 EKALASI PAKET KR. LUAS ‐ BTS. SUMUT (MYC 2011‐2012) 5.446.359 0 5.446.359

74PAKET PERBAIKAN/PENANGGULANGAN KERUSAKAN AKIBAT BENCANA ALAM RUAS JALAN KM. 125 ‐ KM. 180 ( N.028) 3.171.650 0 3.171.650

75 ESKALASI PAKET KM. 125 ‐ KM. 180 (CALANG TEUNOM) SEKSI I (MYC 2011 ‐ 2012) 4.446.405 0 4.446.4054498577 PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI SUMATERA UTARA 

76 PENANGGULANGAN BENCANA ALAM RUAS JALAN TAPSEL I/II 5 862 426 0 5 862 42676 PENANGGULANGAN BENCANA ALAM RUAS JALAN TAPSEL I/II 5.862.426 0 5.862.426

77PENANGGULANGAN BENCANA ALAM RUAS JALAN BTS PROV.NAD‐SARAGIH‐MANDUAMAS‐BARUS STA.90+350 4.615.690 0 4.615.690

78 PENANGGULANGAN BENCANA ALAM RUAS JALAN SIDIKALANG‐KUTABULUH I 3.189.215 0 3.189.21579 PENANGGULANGAN BENCANA ALAM RUAS JALAN JEMBATAN MERAH‐RANJAU BATU 3.940.915 0 3.940.91580 Rekonstruksi/Peningkatan Struktur Jalan Rampa ‐ Poriaha/Mungkur (MYC WINRIP) 3.343.116 5.284.000 8.627.11681 Pelebaran Jalan Bts Kota Sibolga ‐ Batangtoru (MYC WINRIP) 1.976.375 4.000.000 5.976.375

82PENANGGULANGAN BENCANA ALAM RUAS JALAN BTS.KOTA TARUTUNG‐BTS.KAB TAPTENG 5 709 705 0 5 709 70582 TAPTENG 5.709.705 0 5.709.705

83 PENANGGULANGAN BENCANA ALAM RUAS JBT.AEK RANTOPURAN 6.243.524 0 6.243.52484 PENANGGULANGAN BENCANA ALAM RUAS JALAN BTS BARUS‐BTS KOTA SIBOLGA 2.058.904 0 2.058.904

85PENANGGULANGAN BENCANA ALAM RUAS JALAN BTS KAB.TAPUT‐KOTA SIBOLGA‐KOTA P.SIDIMPUAN 5.597.589 0 5.597.589

REKAPITULASI BELUM LELANG PAKET KONTRAKTUAL TA 2013DI LINGKUNGAN DITJEN BINA MARGASTATUS 16 September 2013 ; 16:00 WIB

dalam ribuan 

KODE SATKER/PAKET PEKERJAANPagu 

RPM PLN TOTALKODE SATKER/PAKET PEKERJAAN  RPM PLN TOTAL4498577 PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI SUMATERA UTARA 

86PENANGGULANGAN BENCANA ALAM RUAS JALAN BTS KOTA TARUTUNG‐BTS KAB TAPTENG 5.709.705 0 5.709.705

87 PENANGGULANGAN BENCANA ALAM RUAS JALAN TAPSEL I/II 5.862.426 0 5.862.42688 PENANGGULANGAN BENCANA ALAM RUAS JALAN BTS.TAPUT‐SIPIROK 4.790.338 0 4.790.33889 PENANGGULANGAN BENCANA ALAM RUAS JALAN SIDIKALANG‐KUTABULUH II 1.532.214 0 1.532.214

90PENANGGULANGAN BENCANA ALAM RUAS JALAN BTS PROV.NAD‐SARAGIH‐MANDUAMAS BARUS STA 102 250 102 900 7 241 449 0 7 241 44990 MANDUAMAS‐BARUS STA.102+250‐102+900 7.241.449 0 7.241.449

4498579 PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI SUMBAR 91 REKONSTRUKSI JALAN MANGGOPOH ‐ BTS. KOTA PARIAMAN 5.498.060 11.545.934 17.043.994

92PENINGKATAN KAPASITAS RUAS JALAN SIMP. AIR BALAM ‐ UJUNG GADING (SIMP. EMPAT) 6.748.520 15.221.884 21.970.404

4498580 PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI SUMBAR 93 ‐ [B] REKON.JLN.RUAS KAMBANG ‐ INDRAPURA (LOAN REG.10842601) (PPK 15) 4.693.552 6.832.000 11.525.55294 ‐ [C] REKON.JLN.RUAS INDRAPURA ‐ TAPAN (LOAN REG.10842601) (PPK 15) 2.491.550 6.106.023 8.597.57395 [A] PENGADAAN GENSET (SATKER INDUK) 200 0 20095 [A] PENGADAAN GENSET (SATKER INDUK) 200 0 20096 [B] PENGADAAN FASILITAS PERKANTORAN (SATKER INDUK) 30.765 0 30.765

97[A] PENGADAAN PERANGKAT PENGOLAH DATA DAN KOMUNIKASI {SATKER INDUK) 107.411 0 107.411

4498588 PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI BENGKULU 98 PELEBARAN JALAN MUKOMUKOBANTAL 3.761.140 6.120.000 9.881.14099 PELEBARAN JALAN BANTAL‐IPUH 6.919.050 14.530.011 21.449.061100 PELEBARAN JALAN KERKAP‐PS. PEDATI (S. HITAM) 2.160.564 4.537.185 6.697.749

4498589 PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI BENGKULU 101 PELEBARAN JALAN SP.RUKIS(MANNA)‐TANJUNG KEMUNING 5.587.987 9.529.000 15.116.987

4498590 PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI SUMSEL 102 Penggantian Jembatan Nuri I, CS 10.718.197 0 10.718.197

4498592 PELAKSANAAN JALAN METROPOLITAN PALEMBANG 103 Paket 7. Pelebaran Jalan Basuki Rahmat, Cs 8.980.120 0 8.980.120

4498596 PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI LAMPUNG 104 PELEBARAN JALAN PUGUNG TAMPAK ‐ SP. GUNUNG KEMALA (WINRIP) 546.503 3.805.472 4.351.975

4498597 PELAKSANAAN JALAN NASIONAL METROPOLITAN I JAKARTA 105 Paket Pembangunan Underpass Bulak Kapal 144.009 0 144.009

4498603 PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI BANTEN 

106Rekonstruksi/ Peningkatan Struktur Jalan Bts. Kota Pandeglang ‐ Bts. Kota Rangkasbitung (Putus kontrak) 3.745.016 0 3.745.016

4498620 PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI JATENG 107 PELEBARAN JALAN WAWAR‐CONGOT (RRDP) 2.400.000 8.147.000 10.547.000108 PELEBARAN JALAN WAWAR ‐ TAMBAKMULYO (RRDP) 8.148.000 27.653.000 35.801.000

4498625 PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI JATIM 109 Pemeliharaan Berkala Jembatan Semampir 1.978.260 0 1.978.260

4498646 PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI BALI 110 PENYUSUNAN LEGER JALAN 595.4 0 595.4

REKAPITULASI BELUM LELANG PAKET KONTRAKTUAL TA 2013DI LINGKUNGAN DITJEN BINA MARGASTATUS 16 September 2013 ; 16:00 WIB

dalam ribuan 

KODE SATKER/PAKET PEKERJAANPagu 

RPM PLN TOTALKODE SATKER/PAKET PEKERJAAN  RPM PLN TOTAL4498651 PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI NTB 111 PEL. JALAN KM.70 ‐ BTS. KAB.DOMPU 1 (PEMBAYARAN TUNGGAKAN)(07) 3.801.914 0 3.801.914112 PEL. JALAN PAL. IV ‐ KM. 70 (PEMBAYARAN TUNGGAKAN) (06) 5.222.817 0 5.222.817113 PEMB. JALAN KAWASAN STRATEGIS LENANGGUAR ‐ LUNYUK (APBNP‐NP)(07) 31.380.500 0 31.380.500114 PEMB. JALAN KAWASAN STRATEGIS SEJORONG ‐ TETAR (APBNP‐NP)(05) 12.708.100 0 12.708.100115 PEL. JALAN SP. NEGARA ‐ BTS. KOTA SUMBAWA BESAR (APBNP‐NP) (06) 13.958.100 0 13.958.100116 PEL. JALAN SP. NEGARA ‐ TALIWANG (PEMBAYARAN TUNGGAKAN) (05) 3.886.793 0 3.886.793

4498659 PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI SULUT 117 PEMBAYARAN ESKALASI WOROTICAN ‐ ATINGGOLA (SATKER) 1.700.000 0 1.700.000118 PEMBAYARAN ESKALASI MOLIBAGU ‐MAMALIA ‐ JBT. ESU ‐01 (PPK 14) 2.100.000 4.900.000 7.000.000

4498684 PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI PAPUA (MERAUKE) 119 LEGER RUAS JALAN MUTING ‐MANDOM 34.72 0 34.72

4498685 PELAKSANAAN JALAN NASIONAL WILAYAH VII PROVINSI PAPUA (NABIRE) 120 Penanganan Darurat Akibat Bencana Alam Jembatan Kali Bumi 378.539 0 378.539

4498687 PELAKSANAAN JALAN NASIONAL WILAYAH VIII PROVINSI PAPUA (PANIAI) 

121PENANGANAN MENDESAK DAN TANGGAP DARURAT BENCANA ALAM RUAS JALAN BEDUDIPA‐MOANEMANI 7.599.500 0 7.599.500

4499682BADAN LAYANAN UMUM (BLU) BIDANG PENDANAAN SEKRETARIAT BADAN PENGATUR JALAN TOL (BPJT) 

122 Jasa Pemeriksaan Keuangan dan Manajemen 350 0 3504505136 PELAKSANAAN JALAN BEBAS HAMBATAN SOLO ‐ KERTOSONO 123 PEMBANGUNAN TOL SOLO ‐ KERTOSONO 0 800 800

REVIEW DESAIN PEMBANGUNAN JALAN TOL, AKSES, INTERCHANGE, PILE SLAB, 124 OVERPASS, OPRIT OVERPASS DAN UNDERPASS SEKSI IV, V, VI, VII DAN VIII (SYC) 1.640.000 0 1.640.000

125

REVIEW DESAIN PEMBANGUNAN JALAN TOL, AKSES, JUNCTION, INTERCHANGE, UNDERPASS, OVERPASS, OPRIT OVERPASS DAN JEMBATAN SEKSI I, II DAN III (MYC) 1.790.000 0 1.790.000

126 REVIEW DESAIN PEMBANGUNAN JALAN TOL DAN OVERPASS SEKSI IX (SYC) 1.175.000 0 1.175.0004648080 UNIT PERALATAN DAN PENGUJIAN CIKAMPEK 127 Pengadaan Alat Laboratorium 500 0 500

4902083 PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI KEP. RIAU 

128Penyusunan Dokumen Perencanaan Penananganan Jalan Nasional di Kota Batam 50 0 50

129Penyusunan Dokumen Perencanaan Penananganan Jalan Nasional di Kabupaten Karimun 50 0 50

130Penyusunan Dokumen Perencanaan Penananganan Jalan Nasional di Kabupaten Bintan dan Kota Tanjungpinang 50 0 50

131 TEST DIAGNOSA JEMBATAN RH. FISABILILLAH DI KOTA BATAM 1.239.842 0 1.239.842Penyusunan Dokumen Perencanaan Penananganan Jalan Nasional di Kabupaten 

132y g p

Natuna 50 0 50TOTAL 489.541.967 139.827.612 629.369.579

44

45

1 Optimalisasi untuk kegiatan mendesak1. Optimalisasi untuk kegiatan mendesak

2. Pengembangan infrastruktur di Jawa Timur

BA. 9993. Pengembangan infrastruktur di Papua

4. Pengembangan infrastruktur di Papua Barat

Optimalisasi Kegiatan Mendesak

No Lokasi Jumlah (Rpx1000)

1 S t B t 22 500 001 Sumatera Barat 22.500.00

2 Jawa Timur 214.000.000

3 Kalimantan Barat 41.000.000

4 NTB 230.000.000

5 Sulawesi Utara 15.000.000

6 Maluku 235.000.0006 Maluku 235.000.000

7 Papua 107.600.000

8 Papua Barat 117.400.000

TOTAL 982.500.000

Dalam Ribuan RupiahDalam Ribuan Rupiah KODE PROGRAM / SATKER ALOKASI ANGGARAN 

PROGRAM PENYELENGGARAAN JALAN 982.500.000,00 SUMATERA BARAT                                                          22.500.000 

498579   PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI SUMBAR                  22.500.000 JAWA TIMUR                                                              214.000.000 

498625   PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI JATIM               199.450.000 471735   PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI JAWATIMUR                       14.550.000 

KALIMANTAN BARAT                                                        41.000.000 498632   PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI KALBAR                 11.000.000 498633   PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI KALBAR                10.000.000 498634   PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI KALBAR                20.000.000 

NUSA TENGGARA BARAT                                                     230.000.000 498650   PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI NTB               64.780.000 498651   PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI NTB               58.250.000 498652   PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI NTB              95.470.000 

485386  PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI NUSA TENGGARA BARAT                          

11.500.000 

SULAWESI UTARA                                                          15.000.000 498658 PELAKSANAAN JALAN NASIONALWILAYAH I PROVINSI SULUT 5 000 000498658   PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI SULUT                5.000.000 498660   PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI SULUT (SANGIHE TALAUD)          10.000.000 

MALUKU                                                                  235.000.000 498674   PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI MALUKU                 29.550.000 498675   PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI MALUKU                 118.200.000 498676   PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI MALUKU                83.725.000 485474   PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI MALUKU                       3.525.000 

PAPUA                                                                   107.600.000 498680   PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI PAPUA (JAYAPURA)                   27.000.000 498685   PELAKSANAAN JALAN NASIONAL WILAYAH VII PROVINSI PAPUA (NABIRE)                  60.000.000 498687   PELAKSANAAN JALAN NASIONAL WILAYAH VIII PROVINSI PAPUA (PANIAI)                12.750.000 498689 PELAKSANAAN JALAN NASIONAL WILAYAH V PROVINSI PAPUA (PUNCAK JAYA)                5.600.000 501303   PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI PAPUA                      2.250.000 

PAPUA BARAT 117 400 000PAPUA BARAT                                                             117.400.000 498690   PELAKSANAAN JALAN NASIONAL WILAYAH V PROVINSI PAPUA BARAT (FAK‐FAK)              20.800.000 498691   PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI PAPUA BARAT (SORONG)             56.500.000 498693   PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI PAPUA BARAT (MANOKWARI )    16.500.000 498695   PELAKSANAAN JALAN NASIONAL WILAYAH IV PROVINSI PAPUA BARAT (BINTUNI)            15.600.000 485480   PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI PAPUA BARAT                 8.000.000 

S 3 20 3Status: 31 Agustus 2013

KODE PROGRAM / SATKERALOKASI

ANGGARAN PROGRES LELANG

SULAWESI UTARA                                                          15.000.000 498658 PELAKSANAAN JALAN NASIONALWILAYAH I PROVINSI SULUT 5 000 000498658   PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI SULUT                5.000.000 

1PENINGKATAN STRUKTUR JALAN MATUNGKAS RING ROAD 5.000.000  Belum Tercatat di e‐Monitoring

498660   PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI SULUT (SANGIHE TALAUD)            10.000.000 1PENINGKATAN STRUKTUR JALAN MELONGGUANE ‐ RAINIS 10.000.000  Terkontrak

MALUKU                                                                  235.000.000 498674   PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI MALUKU                 29.550.000 

1PEMBANGUNAN JALAN MODANMOHE ‐ NAMROLE 29.550.000  Belum Lelang

498675   PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI MALUKU                 118.200.000 1PELEBARAN JALAN LIANG ‐ LATU 24.625.000  Belum Lelang2PELEBARAN JALAN LATU ‐ LIANG 24.625.000  Belum Lelang3PELEBARAN JALAN SP WAIPIA SALEMAN 24 625 000 B l L l3PELEBARAN JALAN SP. WAIPIA ‐ SALEMAN 24.625.000  Belum Lelang4PELEBARAN JALAN SALEMAN ‐ SP. WAIPIA 14.775.000  Belum Lelang5PELEBARAN JALAN BANGGOI ‐ BULA 19.700.000  Belum Lelang6PENINGKATAN STRUKTUR JALAN BULA ‐ DAWANG ‐WARU 9.850.000  Belum Lelang

498676   PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI MALUKU                83.725.000 1PENINGKATAN STRUKTUR JALAN SAUMLAKI ‐ ARUIDAS 9.850.000 Belum Lelang1PENINGKATAN STRUKTUR JALAN SAUMLAKI  ARUIDAS 9.850.000  Belum Lelang2PENINGKATAN STRUKTUR JALAN ARMA ‐ ARUIDAS 34.475.000  Belum Lelang3PENINGKATAN STRUKTUR JALAN ARMA ‐ SIWAHAN 9.850.000  Belum Lelang4PENINGKATAN STRUKTUR JALAN ILWAKI ‐ LURANG 29.550.000  Belum Lelang

485474   PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI MALUKU                       3.525.000 1PENGAWASAN TEKNIS JALAN PULAU BURU 450.000  Belum Lelang2PENGAWASAN TEKNIS JALAN PULAU SERAM 1.800.000  Belum Lelang3PENGAWASAN TEKNIS JALAN PULAU YAMDENA DAN WETAR 1.275.000  Belum Lelang

S 3 20 3

KODE PROGRAM / SATKERALOKASI

ANGGARAN PROGRES LELANG

PAPUA                                                                   107.600.000 498680   PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI PAPUA (JAYAPURA)                   27.000.000 

Status: 31 Agustus 2013

1PENINGKATAN STRUKTUR JALAN BONGGO ‐ BETAF ‐ SARMI 10.000.000 Belum Tercatat di e‐Monitoring tetapi sudah masuk e‐Proc

2PENINGKATAN STRUKTUR JALAN ARSO ‐WARIS 6.000.000 Belum Tercatat di e‐Monitoring tetapi sudah masuk e‐Proc

3PEMBANGUNAN JALAN USKU ‐MEMBRAMO ‐ ELILIM 6.000.000 Belum Tercatat di e‐Monitoring tetapi sudah masuk e‐Proc

Belum Tercatat di e Monitoring4PENGGANTIAN JEMBATAN KALI BUAYA 5.000.000 

Belum Tercatat di e‐Monitoring tetapi sudah masuk e‐Proc

498685   PELAKSANAAN JALAN NASIONAL WILAYAH VII PROVINSI PAPUA (NABIRE)                  60.000.000 1PENINGKATAN STRUKTUR JALAN NABIRE ‐ TOPO 12.500.000  Proses Lelang2PENINGKATAN STRUKTUR JALAN TOPO ‐ NABIRE 12.500.000  Proses Lelang3PENINGKATAN STRUKTUR JALAN BTS. KOTA NABIRE ‐ KIMIBAY 15.000.000  Proses Lelang4PEMBANGUNAN JALAN BARU NABIRE ‐ LEGARI ‐WAPOGA 10 000 000 Proses Lelang4PEMBANGUNAN JALAN BARU NABIRE  LEGARI  WAPOGA 10.000.000  Proses Lelang5PENGGANTIAN JEMBATAN MAHMUD (LANJUTAN TAHAP 2) 4.000.000  Proses Lelang6PENGGANTIAN JEMBATAN ROMBE (LANJUTAN TAHAP 2) 6.000.000  Proses Lelang

498687   PELAKSANAAN JALAN NASIONAL WILAYAH VIII PROVINSI PAPUA (PANIAI)                12.750.000 1PENINGKATAN STRUKTUR JALAN MOANEMANI ‐WAGETE ‐ TIMIKA 12.750.000  Proses Lelang

498689 PELAKSANAAN JALAN NASIONAL WILAYAH V PROVINSI PAPUA (PUNCAK JAYA)                5.600.000 

1PENGADAAN RANGKA JEMBATAN 5 600 000Belum Tercatat di e‐

1PENGADAAN RANGKA JEMBATAN 5.600.000 Belum Tercatat di e

Monitoring501303   PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI PAPUA                      2.250.000 

1PENGAWASAN TEKNIS JALAN DAN JEMBATAN 2.250.000  Proses Lelang

S 3 20 3

KODE PROGRAM / SATKERALOKASI

ANGGARAN PROGRES LELANG

PAPUA BARAT                                                             117.400.000 498690   PELAKSANAAN JALAN NASIONAL WILAYAH V PROVINSI PAPUA BARAT (FAK‐FAK)        20.800.000 

1PENINGKATAN RUAS KAIMANA TANGGAROMI 5 200 000 B l T t t di M it i

Status: 31 Agustus 2013

1PENINGKATAN RUAS KAIMANA ‐ TANGGAROMI 5.200.000  Belum Tercatat di e‐Monitoring2LANJUTAN PEMBANGUNAN JALAN BOFUWER ‐WINDESI 5.200.000  Belum Tercatat di e‐Monitoring3LANJUTAN PEMBANGUNAN RUAS BOMBERAI ‐ FAKFAK ‐ SIBORU 5.200.000  Belum Tercatat di e‐Monitoring4PEMBANGUNAN JEMBATAN SIPATANAM, FAKFAK 5.200.000  Belum Tercatat di e‐Monitoring

498691   PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI PAPUA BARAT (SORONG)       56.500.000 1PENINGKATAN STRUKTUR JALAN BTS KAB SORSEL ‐ KAMBUAYA 10.000.000 Proses Lelang1PENINGKATAN STRUKTUR JALAN BTS KAB SORSEL  KAMBUAYA 10.000.000  Proses Lelang2PENANGANAN LONGSORAN BTS KOTA SORONG ‐ KLAMONO 6.000.000  Proses Lelang3PENANGANAN JALAN SORONG ‐MAKBON 5.200.000  Proses Lelang4LANJUTAN PEMBANGUNAN JALAN LINGKAR RAJA AMPAT 9.000.000  Proses Lelang5PENINGKATAN JALAN RUFEI ‐ SAUKA 5.200.000  Proses Lelang6PENINGKATAN JALAN MAKBON ‐MEGA 5.200.000  Proses Lelang7PEMBANGUNAN JEMBATAN KLASAN 5.500.000  Proses Lelang8PEMBANGUNAN JEMBATAN MEGA 2 5.200.000  Proses Lelang9LANJUTAN PEMBANGUNAN JEMBATAN KLABALA SORONG 5.200.000  Proses Lelang

498693  PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI PAPUA BARAT (MANOKWARI )                     

16.500.000 

1PENINGKATAN STRUKTUR JALAN RANSIKI ‐MAMEH 5.500.000  Belum Tercatat di e‐Monitoring2PENINGKATAN STRUKTUR JALAN PRAFI ‐ ARFU 5 500 000 Belum Tercatat di e‐Monitoring2PENINGKATAN STRUKTUR JALAN PRAFI  ARFU 5.500.000  Belum Tercatat di e Monitoring3PENINGKATAN STRUKTUR JALAN ARFU ‐ KEBAR 5.500.000  Belum Tercatat di e‐Monitoring

498695   PELAKSANAAN JALAN NASIONAL WILAYAH IV PROVINSI PAPUA BARAT (BINTUNI)      15.600.000 1LANJUTAN PEMBANGUNAN JALAN WINDESI ‐ BOFUWER 5.200.000  Proses Lelang2LANJUTAN PEMBANGUNAN JALAN WASIOR ‐WINDESI 5.200.000  Proses Lelang3LANJUTAN PEMBANGUNAN JALAN YAUR ‐ YAMOR 5.200.000  Proses Lelang

485480   PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI PAPUA BARAT          8.000.000 1Perencanaan dan Pengawasan Teknis Jalan dan Jembatan 8.000.000  Belum Tercatat di e‐Monitoring

TargetAU/ AU/ Pagu

Nilai Dukung

Realisasi Progres

NoUnit Organisasi/ Satker/ Paket/ Sub 

Paket 

Target DukungF/ K/ (Rp Ribu)  (Rp Ribu) (Rp Ribu) (%) 

Kuantitas

SatuanNF S

Akun PaketRencana

Keu FisikPengadaan

5 PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI SUMBAR 22.500.000 22.500.000

6 PENANGANAN TEBING (SHOTCRETE) 900(900) M F K 0 00 0 00 20 000 000 20 000 000 0 00 0 00 0 006 PENANGANAN TEBING (SHOTCRETE) JEMBATAN KELOK 9 (APBN‐P)

900(900) M F K 0,00 0,00 20.000.000 20.000.000 0,00 0,00 0,00

7 JALAN AKSES KE KOTO BARANGAI, BUKITTINGGI (APBN‐P)

1(1) KM F K 0,00 0,00 2.500.000 2.500.000 0,00 0,00 0,00

8 PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI KALBAR

11.000.000 10959.860

9 Pembangunan Jembatan Sabbo Kab. Sambas

80 M F K 0,00 0,00 11.000.000 10.959.860 0,00 0,00 0,00Sambas

10 PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI NTB

64.780.000 64.780.000 64.780.000 64.780.000

11 PEMBANGUNAN JEMBATAN KALI JANGKOK (APBNP‐NP)

80(80) M F K 24.000.000 24.000.000 24.000.000 24.000.000 0,00 0,00 0,00

12 PEMBANGUNAN JEMBATAN AWANG 2 (APBNP‐NP)

100(100) M F K 18.030.000 18.030.000 18.030.000 18.030.000 0,00 0,00 0,00

13 PEMBANGUNAN JALAN SP PENGANTAP 3 5(3 5) KM F K 22 750 000 22 750 000 22 750 000 22 750 000 0 00 0 00 0 0013 PEMBANGUNAN JALAN SP.PENGANTAP‐MT.AJAN‐KUTA (APBNP‐NP)

3.5(3.5) KM F K 22.750.000 22.750.000 22.750.000 22.750.000 0,00 0,00 0,00

14 PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI NTB 95.470.000 95.470.000 95.470.000 95.470.000

15 PELEBARAN JALAN TALABIU ‐ BATAS KOTA BIMA (PPK 09) APBNP

2.9(2.9) KM F K 17.580.580 17.580.580 17.580.580 17.580.580 0,00 0,00 0,00

16 PELEBARAN JALAN RABA SAPE (PPK 10) 4 92(4 9 KM F K 17 200 580 17 200 580 17 200 580 17 200 580 0 00 0 00 0 0016 PELEBARAN JALAN RABA ‐ SAPE (PPK 10) APBNP

4.92(4.92)

KM F K 17.200.580 17.200.580 17.200.580 17.200.580 0,00 0,00 0,00

17 PEL. KAWASAN STRATEGIS JALAN HUU ‐PARADO (PPK 08) APBNP

3(3) KM F K 13.380.580 13.380.580 13.380.580 13.380.580 0,00 0,00 0,00

18 PEL. KAWASAN STRATEGIS JALAN KEMPO ‐ KESI ‐ HODO 01 (PPK 08) APBNP

4(4) KM F K 20.130.580 20.130.580 20.130.580 20.130.580 0,00 0,00 0,00

19 KAWASAN STRATEGIS JALAN KEMPO ‐KESI HODO 02 (PPK 10) APBNP

3.35(3.35)

KM F K 13.480.580 13.480.580 13.480.580 13.480.580 0,00 0,00 0,00KESI ‐ HODO 02 (PPK 10) APBNP 5)

20 PEL. KAWASAN STRATEGIS JALAN KEMPO ‐ KESI ‐ HODO 03 (PPK 09) APBNP

3.35(3.35)

KM F K 13.480.580 13.480.580 13.480.580 13.480.580 0,00 0,00 0,00

REKAPITULASI BELUM LELANG PAKET KONTRAKTUAL TA 2013DI LINGKUNGAN DITJEN BINA MARGASTATUS 16 September 2013 ; 16:00 WIB

dalam ribuan 

/Pagu 

KODE SATKER/PAKET PEKERJAAN  RPM PLN TOTALSUMATERA BARAT                                                          22.500.000  ‐ 22.500.000 PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI SUMBAR              22.500.000  ‐ 22.500.000 JAWA TIMUR                                                              214.000.000  ‐ 214.000.000 PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI JATIM               199.450.000  ‐ 199.450.000 PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI JAWATIMUR                      

14.550.000  ‐ 14.550.000 

4498651 PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI NTB 58 046 700 58 046 7004498651 PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI NTB  58.046.700  58.046.700 

113PEMB. JALAN KAWASAN STRATEGIS LENANGGUAR ‐ LUNYUK (APBNP‐NP)(07) 31.380.500  ‐ 31.380.500 

114PEMB. JALAN KAWASAN STRATEGIS SEJORONG ‐ TETAR (APBNP‐NP)(05) 12.708.100  ‐ 12.708.100 

115PEL. JALAN SP. NEGARA ‐ BTS. KOTA SUMBAWA BESAR (APBNP‐NP) (06) 13.958.100  ‐ 13.958.100 

4485386PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI NUSA TENGGARA BARAT 10 255 583 10 255 5834485386 NUSA TENGGARA BARAT  10.255.583  ‐ 10.255.583 

30PAKET 34. PENGAWASAN TEKNIK PELEBARAN JALAN KEMPO ‐ KESI ‐HODO 01 (APBN‐P) 1.121.909  ‐ 1.121.909 

31PAKET 35. PENGAWASAN TEKNIK PELEBARAN JALAN KEMPO ‐ KESI ‐HODO 02 (APBN‐P) 1.121.909  ‐ 1.121.909 

32PAKET 36. PENGAWASAN TEKNIK PELEBARAN JALAN KEMPO ‐ KESI ‐HODO 03 (APBN‐P) 1.121.909  ‐ 1.121.909 

33PAKET 33. PENGAWASAN TEKNIK PELEBARAN JALAN RABA ‐ SAPE DAN TALABIU BTS KOTA BIMA (APBN P) 1 322 437 1 322 43733 DAN TALABIU ‐ BTS. KOTA BIMA (APBN‐P) 1.322.437  ‐ 1.322.437 

34PAKET 32. PENGAWASAN TEKNIK PELEBARAN JALAN SBW BESAR ‐ SP. NEGARA 01 (APBN‐P) 1.167.265  ‐ 1.167.265 

35PAKET 31. PENGAWASAN TEKNIK PEMBANGUNAN JALAN LENDANGGUAR ‐ LUNYUK (APBN‐P) 831.474  ‐ 831.474 

36PAKET 30. PENGAWASAN TEKNIK PEMBANGUNAN JALAN SEJORONG ‐TETAR (APBN‐P) 831.474  ‐ 831.474 PAKET 37. PENGAWASAN TEKNIK PELEBARAN JALAN HU'U ‐ PARADO ( )37 (APBN‐P) 788.821  ‐ 788.821 

38PAKET 27. PENGAWASAN TEKNIK PEMBANGUNAN JEMBATAN AWANG 2 (APBN‐P) 1.091.109  ‐ 1.091.109 

39PAKET 29. PENGAWASAN TEKNIK PEMBANGUNAN JALAN SP. PENGANTAP ‐MT. AJAN ‐ KUTA (APBN‐P) 857.276  ‐ 857.276 

REKAPITULASI PROSES LELANG PAKET KONTRAKTUAL TA 2013DI LINGKUNGAN DITJEN BINA MARGASTATUS 16 September 2013 ; 16:00 WIB

dalam ribuan 

KODE SATKER/PAKET PEKERJAAN Pagu 

RPM PLN TOTAL4498650 PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI NTB  64.721.740  64.721.740 

83 PEMBANGUNAN JEMBATAN KALI JANGKOK (APBNP‐NP) 23.980.580  0 23.980.580 

84 PEMBANGUNAN JEMBATAN AWANG 2 (APBNP‐NP) 18.010.580  0 18.010.580 

85 PEMBANGUNAN JALAN SP.PENGANTAP‐MT.AJAN‐KUTA (APBNP‐NP) 22.730.580  0 22.730.580 

4498652 PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI NTB  95.253.480  95.253.480 

88 PELEBARAN JALAN TALABIU ‐ BATAS KOTA BIMA (PPK 09) APBNP 17.580.580  0 17.580.580 

89 PEL. KAWASAN STRATEGIS JALAN HUU ‐ PARADO (PPK 08) APBNP 13.380.580  0 13.380.580 

90 PEL. KAWASAN STRATEGIS JALAN KEMPO ‐ KESI ‐ HODO 01 (PPK 08) APBNP 20.130.580  0 20.130.580 

91 KAWASAN STRATEGIS JALAN KEMPO ‐ KESI ‐ HODO 02 (PPK 10) APBNP 13.480.580  0 13.480.580 92 PEL. KAWASAN STRATEGIS JALAN KEMPO ‐ KESI ‐ HODO 03 (PPK 09) APBNP 13.480.580  0 13.480.580 

93 PELEBARAN JALAN RABA ‐ SAPE (PPK 10) APBNP 17.200.580  0 17.200.580 4498660 PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI SULUT (SANGIHE TALAUD) 9 978 300 9 978 3004498660 PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI SULUT (SANGIHE TALAUD)  9.978.300  9.978.300 

95 Peningkatan Struktur Jalan Melonguane ‐ Rainis (APBNP ‐ NP) 9.978.300  0 9.978.300 4498674 PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI MALUKU  29.515.625  29.515.625 

98 Pembangunan Jalan Modanmohe ‐ Namrole (APBN‐P) 29.515.625  0 29.515.625 4498675 PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI MALUKU  118.095.300  118.095.300 

99 Pelebaran Jalan Latu ‐ Liang (APBNP‐NP) 24.607.100  0 24.607.100 100 Pelebaran Jalan Saleman ‐Waipia (APBNP‐NP) 14.757.100  0 14.757.100 101 Peningkatan Struktur Jalan Bula ‐ Dawang ‐Waru ( APBNP‐NP ) 9.834.800  0 9.834.800 102 Pelebaran Jalan Liang ‐ Latu (APBNP‐NP) 24.607.100  0 24.607.100 103 Pelebaran Jalan Banggoi ‐ Bula (APBNP‐NP) 19.682.100  0 19.682.100 104 Pelebaran Jalan Waipia ‐ Saleman (APBNP‐NP) 24.607.100  0 24.607.100 

4498676 PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI MALUKU  83.308.000  83.308.000 105 PENINGKATAN STRUKTUR JALAN ARUIDAS ‐ SAUMLAKI (APBNP‐NP) 9.749.375  0 9.749.375 106 PENINGKATAN STRUKTUR JALAN ILWAKI ‐ LURANG (APBN‐P) 29.442.125  0 29.442.125 107 PENINGKATAN STRUKTUR JALAN SIWAHAN ‐ ARMA (APBNP‐NP) 9.749.375  0 9.749.375 108 PENINGKATAN STRUKTUR JALAN ARMA ‐ ARUIDAS (APBNP‐NP) 34.367.125  0 34.367.125 

4485474 PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI MALUKU  3.042.150  ‐ 3.042.150 

37 001. 01 Paket Pengawasan Teknis Jalan di Pulau Yamdena dan Wetar (APBN‐P) 1.275.000  0 1.275.000 

38 001. 01 Paket Pengawasan Teknis Jalan di Pulau Seram (APBN‐P) 1.766.700  0 1.766.700 

39 001 01 P k P T k i J l di P l B (APBN P) 450 0 45039 001. 01 Paket Pengawasan Teknis Jalan di Pulau Buru (APBN‐P) 450  0 450 

4498685 PELAKSANAAN JALAN NASIONAL WILAYAH VII PROVINSI PAPUA (NABIRE)  120.158.625  120.158.625 

116 Pembangunan Jalan Baru Nabire‐Lagari‐Wapoga (APBNP‐NP) 9.983.680  0 9.983.680 

117 Rekonstruksi Peningkatan Struktur Jalan Nabire‐Topo (APBNP‐NP) 12.480.580  0 12.480.580 

118 Rekonstruksi /Peningkatan Ruas Jalan Topo‐Nabire (APBNP‐NP) 12.480.580  0 12.480.580 

119 Rekonstruksi /Peningkatan Ruas Jalan Topo‐Nabire (APBNP‐NP) 14.980.580  0 14.980.580 

120 P b J l W Y (APBNP DP) 19 980 580 0 19 980 580120 Pembangunan Jalan Wanggar ‐ Yaur (APBNP‐DP) 19.980.580  0 19.980.580 

121 Pembangunan Jalan Lagari‐Napan ‐Wapoga (APBNP‐DP) 9.983.680  0 9.983.680 

122 Penanganan Mendesak Pasca Bencana Longsoran Jalan Ruas Bedudipa Batas Kota Nabire 30.299.235  0 30.299.235 

123 Penggantian Jembatan Rombe (APBNP‐NP) 5.983.680  0 5.983.680 

124 Penggantian Jembatan Mahmud (APBNP‐NP) 3.986.030  0 3.986.030 

4498687 PELAKSANAAN JALAN NASIONAL WILAYAH VIII PROVINSI PAPUA (PANIAI)  12.730.580  12.730.580 

125 PENINGKATAN STRUKTUR JALAN MOANEMANI WAGETE TIMIKA (APBN P) 12 730 580 0 12 730 580125 PENINGKATAN STRUKTUR JALAN MOANEMANI‐WAGETE‐TIMIKA (APBN‐P) 12.730.580  0 12.730.580 

4498691 PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI PAPUA BARAT (SORONG)  51.178.840  51.178.840 

127 Lanjutan Pembangunan Jalan Lingkar Raja Ampat (APBN‐P) 8.983.680  0 8.983.680 

128 Pembangunan Jalan Klasam (APBN‐P) 5.483.680  0 5.483.680 

129 Penanganan Longsoran Bts. Kota Sorong‐Klamono (APBN‐P) 5.983.680  0 5.983.680 

130 Penanganan Jalan Sorong‐Makbon (Peningkatan) APBN‐P 5.186.030  0 5.186.030 

131 L j t P b J b t Kl b l S (APBN P) 5 186 030 0 5 186 030131 Lanjutan Pembangunan Jembatan Klabala Sorong (APBN‐P) 5.186.030  0 5.186.030 

132 Peningkatan Jalan Makbon‐Mega (APBN‐P) 5.186.030  0 5.186.030 

133 Peningkatan Struktur Jalan Bts. Kab. Sorsel‐Kambuaya (APBN‐P) 9.983.680  0 9.983.680 

134 Peningkatan Jalan Rufei‐Sauka (APBN‐P) 5.186.030  0 5.186.030 

4498695PELAKSANAAN JALAN NASIONAL WILAYAH IV PROVINSI PAPUA BARAT (BINTUNI)  15.555.000  0 15.555.000 

137 PEMBANGUNAN JALAN WINDESI ‐ BOFUWER (APBN‐P) 5.185.000  0 5.185.000 

138 PEMBANGUNAN JALAN YAUR ‐ YAMOR (APBN‐P) 5.185.000  0 5.185.000 

139 PEMBANGUNAN JALANWASIOR WINDESI (APBN P) 5 185 000 0 5 185 000139 PEMBANGUNAN JALAN WASIOR ‐WINDESI (APBN‐P) 5.185.000  0 5.185.000 

4501303 PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI PAPUA  1.494.477  1.494.477 

149 Pengawasan Teknis Jalan dan Jembatan Jayapura 1 (APBN‐P) 82.747  0 82.747 

150 Pengawasan Teknis Jalan dan Jembatan Nabire 1 (APBN‐P) 934.844  0 934.844 

155 Pengawasan Teknis Jalan dan Jembatan Paniai 1 (APBN‐P) 476.886  0 476.886 

REKAPITULASI BELUM LELANG PAKET KONTRAKTUAL TA 2013DI LINGKUNGAN DITJEN BINA MARGASTATUS 16 September 2013 ; 16:00 WIB

dalam ribuan 

KODE SATKER/PAKET PEKERJAAN Pagu 

RPM PLN TOTALSUMATERA BARAT                                                          22.500.000  ‐ 22.500.000 PELAKSANAAN JALAN NASIONALWILAYAH I PROVINSI SUMBAR 22 500 000 ‐ 22 500 000PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI SUMBAR                  22.500.000  22.500.000 JAWA TIMUR                                                              214.000.000  ‐ 214.000.000 PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI JATIM               199.450.000  ‐ 199.450.000 PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI JAWATIMUR                      

14.550.000  ‐ 14.550.000 

4498651 PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI NTB  58.046.700  58.046.700 

113PEMB. JALAN KAWASAN STRATEGIS LENANGGUAR ‐ LUNYUK (APBNP‐NP)(07) 31.380.500  ‐ 31.380.500 

114 PEMB. JALAN KAWASAN STRATEGIS SEJORONG ‐ TETAR (APBNP‐NP)(05) 12.708.100  ‐ 12.708.100 

115 PEL. JALAN SP. NEGARA ‐ BTS. KOTA SUMBAWA BESAR (APBNP‐NP) (06) 13.958.100  ‐ 13.958.100 

4485386PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI NUSA TENGGARA BARAT  10.255.583  ‐ 10.255.583 

30PAKET 34. PENGAWASAN TEKNIK PELEBARAN JALAN KEMPO ‐ KESI ‐ HODO 01 (APBN‐P) 1.121.909  ‐ 1.121.909 PAKET 35. PENGAWASAN TEKNIK PELEBARAN JALAN KEMPO ‐ KESI ‐ HODO 

31PAK T 35. P NGAWASAN T KNIK P ARAN JA AN K MPO K SI HO O02 (APBN‐P) 1.121.909  ‐ 1.121.909 

32PAKET 36. PENGAWASAN TEKNIK PELEBARAN JALAN KEMPO ‐ KESI ‐ HODO 03 (APBN‐P) 1.121.909  ‐ 1.121.909 

33PAKET 33. PENGAWASAN TEKNIK PELEBARAN JALAN RABA ‐ SAPE DAN TALABIU ‐ BTS. KOTA BIMA (APBN‐P) 1.322.437  ‐ 1.322.437 

34PAKET 32. PENGAWASAN TEKNIK PELEBARAN JALAN SBW BESAR ‐ SP. NEGARA 01 (APBN‐P) 1.167.265  ‐ 1.167.265 PAKET 31 PENGAWASAN TEKNIK PEMBANGUNAN JALAN LENDANGGUAR ‐

35PAKET 31. PENGAWASAN TEKNIK PEMBANGUNAN JALAN LENDANGGUAR LUNYUK (APBN‐P) 831.474  ‐ 831.474 

36PAKET 30. PENGAWASAN TEKNIK PEMBANGUNAN JALAN SEJORONG ‐TETAR (APBN‐P) 831.474  ‐ 831.474 

37PAKET 37. PENGAWASAN TEKNIK PELEBARAN JALAN HU'U ‐ PARADO (APBN‐P) 788.821  ‐ 788.821 

38PAKET 27. PENGAWASAN TEKNIK PEMBANGUNAN JEMBATAN AWANG 2 (APBN‐P) 1.091.109  ‐ 1.091.109 PAKET 29 PENGAWASAN TEKNIK PEMBANGUNAN JALAN SP PENGANTAP ‐

39PAKET 29. PENGAWASAN TEKNIK PEMBANGUNAN JALAN SP. PENGANTAP ‐MT. AJAN ‐ KUTA (APBN‐P) 857.276  ‐ 857.276 

Rekapitulasi Pelaksanaan Anggaran Per Paket Pekerjaan TA 2013APBN‐P (Optimalisasi)

KEMENTERIAN PEKERJAAN UMUM 

AU/ AU/ Pagu Nilai Dukung Realisasi Progres

No Unit Organisasi/ Satker/ Paket/ Sub Paket Target

AU/ AU/ Pagu Nilai Dukung Realisasi ProgresF/ K/ (Rp Ribu)  (Rp Ribu) (Rp Ribu) (%) 

Kuantitas SatuanNF S

Akun PaketRencana

Keu FisikPengadaan

1PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI MALUKU 1,650.21 1,650.21 1,650.21 1,650.21 0.00

2 001. Perencanaan Patok Kilometer di Pulau Ambon dan Ruas Kairatu ‐ SP. Waipia

1(1) DOK NF K 707.24 707.24 707.24 707.24 0.00 0,00 0,00

3 001 Perencanaan Teknis Jalan Dawang ‐Waru ‐ 1(1) DOK NF K 475 66 475 66 475 66 475 66 0 00 0 00 0 003 001. Perencanaan Teknis Jalan Dawang  Waru Kufar

1(1) DOK NF K 475.66 475.66 475.66 475.66 0.00 0,00 0,00

4 001.01. Perencanaan Teknis Jalan Dawang ‐Waru ‐ Kufar

1 DOK NF K 467.30 467.30 467.30 467.30 0.00 0,00 0,00

21 PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI MALUKU

22 Pembangunan Jalan Modanmohe ‐ Namrole (APBN‐P)

5.9(5.9) KM F K 29.515.625 29.515.625 29.515.625 29.515.625 0.00 0,00 0,00

23 Pembangunan Jalan Modanmohe Namrole 5 9 KM F K 29 515 625 29 515 625 29 515 625 29 515 625 0 00 0 00 0 0023 Pembangunan Jalan Modanmohe ‐ Namrole (APBN‐P)

5.9 KM F K 29.515.625 29.515.625 29.515.625 29.515.625 0.00 0,00 0,00

24 PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI MALUKU

25 Peningkatan Struktur Jalan Bula ‐ Dawang ‐Waru ( APBNP‐NP )

8.2(8.2) KM F K 9.834.800 9.834.800 9.834.800 9.834.800 0.00 0,00 0,00

26 Peningkatan Struktur Jalan Bula ‐ Dawang ‐Waru ( APBNP‐NP )

8.2 KM F K 9.834.800 9.834.800 9.834.800 9.834.800 0.00 0,00 0,00

27 Pelebaran Jalan Latu Liang (APBNP NP) 8 9(8 9) KM F K 24 607 100 24 607 100 24 607 100 24 607 100 0 00 0 00 0 0027 Pelebaran Jalan Latu ‐ Liang (APBNP‐NP) 8.9(8.9) KM F K 24.607.100 24.607.100 24.607.100 24.607.100 0.00 0,00 0,0028 Pelebaran Jalan Latu ‐ Liang (APBNP‐NP) 8.9 KM F K 24.607.100 24.607.100 24.607.100 24.607.100 0.00 0,00 0,0029 Pelebaran Jalan Liang ‐ Latu (APBNP‐NP) 8.9(8.9) KM F K 24.607.100 24.607.100 24.607.100 24.607.100 0.00 0,00 0,0030 Pelebaran Jalan Liang ‐ Latu (APBNP‐NP) 8.9 KM F K 24.607.100 24.607.100 24.607.100 24.607.100 0.00 0,00 0,0031 Pelebaran Jalan Waipia ‐ Saleman (APBNP‐NP) 8.9(8.9) KM F K 24.607.100 24.607.100 24.607.100 24.607.100 0.00 0,00 0,0032 Pelebaran Jalan Waipia ‐ Saleman (APBNP‐NP) 8.9 KM F K 24.607.100 24.607.100 24.607.100 24.607.100 0.00 0,00 0,0033 Pelebaran Jalan Saleman ‐Waipia (APBNP‐NP) 5.4(5.4) KM F K 14.757.100 14.757.100 14.757.100 14.757.100 0.00 0,00 0,0034 Pelebaran Jalan Saleman Waipia (APBNP NP) 5 4 KM F K 14 757 100 14 757 100 14 757 100 14 757 100 0 00 0 00 0 0034 Pelebaran Jalan Saleman ‐Waipia (APBNP‐NP) 5.4 KM F K 14.757.100 14.757.100 14.757.100 14.757.100 0.00 0,00 0,0035 Pelebaran Jalan Banggoi ‐ Bula (APBNP‐NP) 7.2(7.2) KM F K 19.682.100 19.682.100 19.682.100 19.682.100 0.00 0,00 0,0036 Pelebaran Jalan Banggoi ‐ Bula (APBNP‐NP) 7.2 KM F K 19.682.100 19.682.100 19.682.100 19.682.100 0.00 0,00 0,0037 PELAKSANAAN JALAN NASIONAL WILAYAH III 

PROVINSI MALUKU38 PENINGKATAN STRUKTUR JALAN ARUIDAS ‐

SAUMLAKI (APBNP‐NP)3(3) KM F K 9.749.375 9.749.375 9.749.375 9.749.375 0.00 0,00 0,00

39 PENINGKATAN STRUKTUR JALAN ARMA ‐ 10.4(10.4) KM F K 34.367.125 34.367.125 34.367.125 34.367.125 0.00 0,00 0,00ARUIDAS (APBNP‐NP)

40 PENINGKATAN STRUKTUR JALAN SIWAHAN ‐ARMA (APBNP‐NP)

3(3) KM F K 9.749.375 9.749.375 9.749.375 9.749.375 0.00 0,00 0,00

41 PENINGKATAN STRUKTUR JALAN ILWAKI ‐LURANG (APBNP‐NP)

7.4(7.4) KM F K 29.442.125 29.442.125 29.442.125 29.442.125 0.00 0,00 0,00

Rekapitulasi Pelaksanaan Anggaran Per Paket Pekerjaan TA 2013APBN‐P (Optimalisasi)

KEMENTERIAN PEKERJAAN UMUM 

No Unit Organisasi/ Satker/ Paket/ Sub Paket Target

AU/ AU/ Pagu Nilai Dukung Realisasi ProgresF/ K/ (Rp Ribu)  (Rp Ribu) (Rp Ribu) (%) 

Kuantitas SatuanNF S

Akun PaketRencana

Keu FisikPengadaanPengadaan

42 PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI PAPUA (JAYAPURA)

43 PENGGANTIAN JEMBATAN KALI BUAYA (APBN‐P)

50 M F K 0.00 0.00 4.987.350 4.987.350 0.00 0,00 0,00

44 PENGGANTIAN JEMBATAN KALI BUAYA (APBN‐P)

50 M F K 0.00 0.00 4.987.350 4.987.350 0.00 0,00 0,00

45 PENINGKATAN STRUKTUR JALAN ARSO‐WARIS (APBN‐P)

2 KM F K 0.00 0.00 5.985.300 5.985.300 0.00 0,00 0,00(APBN P)

46 PENINGKATAN STRUKTUR JALAN ARSO‐WARIS (APBN‐P)

2 KM F K 0.00 0.00 5.985.300 5.985.300 0.00 0,00 0,00

47 PENINGKATAN STRUKTUR JALAN BONGGO‐BETAF‐SARMI (APBN‐P)

2 KM F K 0.00 0.00 9.985.300 9.985.300 0.00 0,00 0,00

48 PENINGKATAN STRUKTUR JALAN BONGGO‐BETAF‐SARMI (APBN‐P)

2 KM F K 0.00 0.00 9.985.300 9.985.300 0.00 0,00 0,00

49 PEMBANGUNAN JALAN USKU‐MAMBERAMO‐ELELIM (APBN‐P)

2 KM F K 0.00 0.00 5.985.300 5.985.300 0.00 0,00 0,00ELELIM (APBN‐P)

50 PEMBANGUNAN JALAN USKU‐MAMBERAMO‐ELELIM (APBN‐P)

2 KM F K 0.00 0.00 5.985.300 5.985.300 0.00 0,00 0,00

51 PELAKSANAAN JALAN NASIONAL WILAYAH VII PROVINSI PAPUA (NABIRE)

52 Rekonstruksi Peningkatan Struktur Jalan Nabire‐Topo (APBNP‐NP)

2.5(2.5) KM F K 12.500.000 12.500.000 12.500.000 12.500.000 0.00 0,00 0,00

53 Rekonstruksi /Peningkatan Ruas Jalan Topo‐Nabire (APBNP NP)

2.5(2.5) KM F K 12.500.000 12.500.000 12.500.000 12.500.000 0.00 0,00 0,00Nabire (APBNP‐NP)

54 Rekonstruksi / Peningkatan Struktur Jalan Bts Kota Nabire‐Kimibay (APBNP‐NP)

8(8) KM F K 15.000.000 15.000.000 15.000.000 15.000.000 0.00 0,00 0,00

55 Pembangunan Jalan Baru Nabire‐Lagari‐Wapoga (APBNP‐NP)

2(2) KM F K 10.000.000 10.000.000 10.000.000 10.000.000 0.00 0,00 0,00

56 Penggantian Jembatan Mahmud (APBNP‐NP) 60(60) M F K 4.000.000 4.000.000 4.000.000 4.000.000 0.00 0,00 0,0057 Penggantian Jembatan Mahmud (APBNP‐NP) 60 M F K 3.986.030 3.986.030 4.986.030 3.986.030 0.00 0,00 0,0058 Penggantian Jembatan Rombe (APBNP‐NP) 25(25) M F K 6.000.000 6.000.000 6.000.000 6.000.000 0.00 0,00 0,00

Rekapitulasi Pelaksanaan Anggaran Per Paket Pekerjaan TA 2013APBN‐P (Optimalisasi)

KEMENTERIAN PEKERJAAN UMUM 

No Unit Organisasi/ Satker/ Paket/ Sub Paket Target

AU/ AU/ Pagu Nilai Dukung Realisasi ProgresF/ K/ (Rp Ribu)  (Rp Ribu) (Rp Ribu) (%) 

K tit S tNF S

Ak P k tRencana

K Fi ikKuantitas Satuan Akun Paket Keu FisikPengadaan

59 PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI PAPUA BARAT (SORONG)

60 Peningkatan Struktur Jalan Bts. Kab. Sorsel‐Kambuaya (APBN‐P)

1.25(1.25) KM F K 9.983.680 9.983.680 9.983.680 9.983.680 0.00 0,00 0,00

61 Penanganan Longsoran Bts. Kota Sorong‐Klamono (APBN‐P)

0.1(0.1) KM F K 5.983.680 5.983.680 5.983.680 5.983.680 0.00 0,00 0,00

62 Peningkatan Jalan Rufei‐Sauka (APBN‐P) 0.5(0.5) KM F K 5.186.030 5.186.030 5.186.030 5.186.030 0.00 0,00 0,0063 Peningkatan Jalan Makbon‐Mega (APBN‐P) 0.7(0.7) KM F K 5.186.030 5.186.030 5.186.030 5.186.030 0.00 0,00 0,00g g64 Lanjutan Pembangunan Jalan Lingkar Raja Ampat 

(APBN‐P)2(2) KM F K 8.983.680 8.983.680 8.983.680 8.983.680 0.00 0,00 0,00

65 Pembangunan Jalan Klasam (APBN‐P) 13(13) M F K 5.483.680 5.483.680 5.483.680 5.483.680 0.00 0,00 0,0066 Pembangunan Jembatan Mega 2 (Wonai) (APBNP) 12(12) M F K 5.186.030 5.186.030 5.186.030 5.186.030 0.00 0,00 0,0067 Lanjutan Pembangunan Jembatan Klabala Sorong 

(APBN‐P)12(12) M F K 5.186.030 5.186.030 5.186.030 5.186.030 0.00 0,00 0,00

68 Penanganan Jalan Sorong‐Makbon (Peningkatan) APBN‐P

0.55(0.55) KM F K 5.186.030 5.186.030 5.186.030 5.186.030 0.00 0,00 0,00

69 PELAKSANAAN JALAN NASIONAL WILAYAH IV PROVINSI PAPUA BARAT (BINTUNI)

70 Pembangunan Jalan Tandia ‐ Yaur 0.8(0.8) KM F K 3.786.788 3.786.788 3.786.788 3.786.788 3.786.788 100,00 100,0071 Pembangunan Jalan Tandia ‐ Yaur 0.8 KM F K 3.786.788 3.786.788 3.786.788 3.786.788 3.786.788 100,00 100,0072 Pembangunan Jalan Wasior ‐Windesi 0.8(0.8) KM F K 3.724.352 3.724.352 3.724.352 3.724.352 3.724.352 100,00 100,0073 Pembangunan Jalan Wasior ‐Windesi 0.8 KM F K 3.724.352 3.724.352 3.724.352 3.724.352 3.724.352 100,00 100,0074 Pembangunan Jalan Windesi ‐ Ambuni 0.8(0.8) KM F K 3.741.532 3.741.532 3.741.532 3.741.532 3.741.532 100,00 100,0075 Pembangunan Jalan Windesi ‐ Ambuni 0.8 KM F K 3.741.532 3.741.532 3.741.532 3.741.532 3.741.532 100,00 100,0076 Pembangunan Jalan Windesi ‐ Bofuwer 0.8(0.8) KM F K 3.741.058 3.741.058 3.741.058 3.741.058 3.741.058 100,00 100,0077 Pembangunan Jalan Windesi ‐ Bofuwer 0.8 KM F K 3.741.058 3.741.058 3.741.058 3.741.058 3.741.058 100,00 100,0078 Pembangunan Jalan Mameh ‐Windesi 5.56(5.56) KM F K 23.232.523 23.232.523 23.232.523 23.232.523 23.232.523 100,00 100,0079 Pembangunan Jalan Mameh ‐Windesi 5.56 KM F K 23.232.523 23.232.523 23.232.523 23.232.523 23.232.523 100,00 100,0080 Pembangunan Jalan Yaur ‐ Yamor 0.8(0.8) KM F K 3.742.575 3.742.575 3.742.575 3.742.575 3.742.575 100,00 100,0081 Pembangunan Jalan Yaur ‐ Yamor 0.8 KM F K 3.742.575 3.742.575 3.742.575 3.742.575 3.742.575 100,00 100,0082 Pembangunan Jalan Mameh ‐ Bintuni (MYC) 4.17(4.17) KM F K 17.462.313 17.462.313 47.452.738 17.462.313 9.914.807 56,78 70,3883 Pembangunan Jalan Mameh ‐ Bintuni (MYC) 4.17 KM F K 17.462.313 17.462.313 47.452.738 17.462.313 9.914.807 56,78 70,3884 Pembangunan Jembatan Kali Bintuni I Cs. 10(10) M F K 2.365.171 2.365.171 2.365.171 2.365.171 2.246.912 95,00 100,0085 Pembangunan Jembatan Kali Bintuni I Cs. 10 M F K 2.365.171 2.365.171 2.365.171 2.365.171 2.246.912 95,00 100,0086 Pembangunan Jembatan Kali Sety I, Cs 25(25) M F K 3.789.325 3.789.325 3.789.325 3.789.325 3.599.859 95,00 100,0087 Pembangunan Jembatan Kali Sety I, Cs 25 M F K 3.789.325 3.789.325 3.789.325 3.789.325 3.599.859 95,00 100,0088 Peningkatan Struktur Jalan Tandia‐Sanderawoi‐Yaur 1.69(1.69) KM F K 6.402.482 6.402.482 6.402.482 6.402.482 6.402.482 100,00 100,0089 Pembangunan Jembatan Kali Putih (lanjutan) 25(25) M F K 2.365.498 2.365.498 2.365.498 2.365.498 2.365.498 100,00 100,0090 Pembangunan Jembatan Kali Putih (lanjutan) 25 M F K 2.365.498 2.365.498 2.365.498 2.365.498 2.365.498 100,00 100,0091 Pembangunan Jembatan Kali Botai 12(12) M F K 2.837.316 2.837.316 2.837.316 2.837.316 2.837.316 100,00 100,0092 Pembangunan Jembatan Kali Botai 12 M F K 2.837.316 2.837.316 2.837.316 2.837.316 2.837.316 100,00 100,0093 PEMBANGUNAN JEMBATAN KALI SETY 6(6) M F K 1.512.997 1.512.997 1.512.997 1.512.997 290.28 19,19 66,5594 PEMBANGUNAN JEMBATAN KALI SETY 6 M F K 1.500.000 1.500.000 1.500.000 1.500.000 290.28 19,35 67,1695 PENINGKATAN STRUKTUR JALAN BINTUNI‐MAMEH  4 KM F K 18.989.400 18.989.400 18.989.400 19.000.000 0.00 0,00 0,00

(UP4B)96 PEMBANGUNAN JALAN WASIOR ‐WINDESI (APBN‐P) 1.7(1.7) KM F K 5.200.000 5.200.000 5.200.000 5.200.000 0.00 0,00 0,0097 PEMBANGUNAN JALAN YAUR ‐ YAMOR (APBN‐P) 1.7(1.7) KM F K 5.200.000 5.200.000 5.200.000 5.200.000 0.00 0,00 0,0098 PEMBANGUNAN JALAN WINDESI ‐ BOFUWER (APBN‐

P)1.7(1.7) KM F K 5.200.000 5.200.000 5.200.000 5.200.000 0.00 0,00 0,00

Rekapitulasi Pelaksanaan Anggaran Per Paket Pekerjaan TA 2013APBN‐P (Optimalisasi)

KEMENTERIAN PEKERJAAN UMUM 

NoUnit Organisasi/ Satker/ Paket/ Sub 

Paket 

TargetAU/ AU/ Pagu

Nilai Dukung

Realisasi Progres

F/ K/ (Rp Ribu)  (Rp Ribu) (Rp Ribu) (%) Kuantita

sSatuan

NF SAkun Paket

RencanaKeu Fisik

Pengadaan5 PELAKSANAAN JALAN NASIONAL WILAYAH 

I PROVINSI SUMBAR6 PENANGANAN TEBING (SHOTCRETE)  900(900) M F K 0.00 0.00 20.000.000 20.000.000 0.00 0,00 0,00( )

JEMBATAN KELOK 9 (APBN‐P)( ) , ,

7 JALAN AKSES KE KOTO BARANGAI, BUKITTINGGI (APBN‐P)

1(1) KM F K 0.00 0.00 2.500.000 2.500.000 0.00 0,00 0,00

8 PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI KALBAR

9 Pembangunan Jembatan Sabbo Kab. Sambas

80 M F K 0.00 0.00 11.000.000 10.959.860 0.00 0,00 0,00

10 PELAKSANAAN JALAN NASIONALWILAYAH10 PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI NTB

11 PEMBANGUNAN JEMBATAN KALI JANGKOK (APBNP‐NP)

80(80) M F K 24.000.000 24.000.000 24.000.000 24.000.000 0.00 0,00 0,00

12 PEMBANGUNAN JEMBATAN AWANG 2 (APBNP‐NP)

100(100) M F K 18.030.000 18.030.000 18.030.000 18.030.000 0.00 0,00 0,00

13 PEMBANGUNAN JALAN SP.PENGANTAP‐MT.AJAN‐KUTA (APBNP‐NP)

3.5(3.5) KM F K 22.750.000 22.750.000 22.750.000 22.750.000 0.00 0,00 0,00

14 PELAKSANAAN JALAN NASIONALWILAYAH14 PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI NTB

15 PELEBARAN JALAN TALABIU ‐ BATAS KOTA BIMA (PPK 09) APBNP

2.9(2.9) KM F K 17.580.580 17.580.580 17.580.580 17.580.580 0.00 0,00 0,00

16 PELEBARAN JALAN RABA ‐ SAPE (PPK 10) APBNP

4.92(4.92)

KM F K 17.200.580 17.200.580 17.200.580 17.200.580 0.00 0,00 0,00

17 PEL. KAWASAN STRATEGIS JALAN HUU ‐PARADO (PPK 08) APBNP

3(3) KM F K 13.380.580 13.380.580 13.380.580 13.380.580 0.00 0,00 0,00

18 PEL KAWASAN STRATEGIS JALAN KEMPO 4(4) KM F K 20 130 580 20 130 580 20 130 580 20 130 580 0 00 0 00 0 0018 PEL. KAWASAN STRATEGIS JALAN KEMPO ‐KESI ‐ HODO 01 (PPK 08) APBNP

4(4) KM F K 20.130.580 20.130.580 20.130.580 20.130.580 0.00 0,00 0,00

19 KAWASAN STRATEGIS JALAN KEMPO ‐ KESI ‐ HODO 02 (PPK 10) APBNP

3.35(3.35)

KM F K 13.480.580 13.480.580 13.480.580 13.480.580 0.00 0,00 0,00

20 PEL. KAWASAN STRATEGIS JALAN KEMPO ‐KESI ‐ HODO 03 (PPK 09) APBNP

3.35(3.35)

KM F K 13.480.580 13.480.580 13.480.580 13.480.580 0.00 0,00 0,00

2. DIREKTRIF PRESIDENa) Perbatasan Kalbar ‐ Kaltim – NTTb) Pantai Selatan Jawa Baratc) Optimalisasi Madurad) Program Percepatan Papua dan Papua Barat (P4B)

DIREKTIF PRESIDEN

No Lokasi ProvinsiJumlah

(Rp. x1000)Realisasi

(Rp. x1000)( p ) ( p )

1 Lintas Pantai Selatan Jawa Barat 1.000.000.000 260.016.714

2 Perbatasan 1.000.000.000 395.292.927

Kal Bar 340.000.000 99.792.409

Kal Tim 475.000.000 232.342.675

NTT 185.000.000 63.157.843

3 Optimalisasi 605.000.000 0

Jawa Timur ‐Madura 230.000.000 0Jawa Timur Madura  (999)

230.000.000 0

P4B (999) 375.000.000 0

RENCANA APBNP BA. 999 - TAHUN 2013DITJEN BINA MARGA - KEMENTERIAN PEKERJAAN UMUM

D l Rib R i h Dalam Ribu Rupiah

NO SATUAN KERJA / PAKET SASARAN ALOKASI DANA VOL SAT

A PROVINSI : JAWA TIMURSATKER PELAKSANAAN JALAN NASIONAL METROPOLITAN I SURABAYA PROV. JATIM 222.800.000,00

I Persiapan Jalan Lintas Utara 50.000.000,00

1 Pelebaran Jalan Bts. Kota Bangkalan - Bts. Kab. Sampang 6,74 KM 20.000.000,00

2 Pelebaran Jalan Ketapang - Bts. Kab. Pamekasan 6,00 KM 19.000.000,00

3 Pelebaran Jalan Sotabar - Bts. Kab. Sumenep 3,34 KM 11.000.000,00

II Pelebaran Jalan Nasional Lintas Tengah 105.000.000,00

1 Pelebaran Jalan Bts. Kota Bangkalan - Bts. Kab. Sampang I dan II 13,70 KM 50.000.000,00

2 Pelebaran Jalan Bts. Kab. Bangkalan - Torjun 6,65 KM 26.000.000,00

3 Pelebaran Jalan Bts. Kab. Pamekasan - Bts. Kota Semenep 7,40 KM 29.000.000,00

III Pembangunan Jalan Lintas Pantai Selatan 75.000.000,00

1 Pelebaran Jalan Pamekasan - Sumenep 5,60 KM 22.800.000,00

2 Pelebaran Jalan Rogung - Pagarengan 6,00 KM 22.500.000,00

3 Pelebaran Jalan Pangerangan - Sampang 5 00 KM 22 500 000 00 3 Pelebaran Jalan Pangerangan Sampang 5,00 KM 22.500.000,00

SATKER PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI JAWA TIMUR1 Kegiatan Supervisi 1,00 DOK 7.200.000,00

TOTAL PROVINSI JAWA TIMUR 230.000.000,00

NO SATUAN KERJA / PAKETSASARAN

ALOKASI DANA VOL SAT

PROVINSI : PAPUASATKER BALAI BESAR PELAKSANAAN JALAN NASIONAL X 30.000.000,00 

1 Pengadaan Jembatan Bailey dan Aramco TON 30.000.000,00 

SATKER PELAKSANAAN JALAN NASIONAL WILAYAH V PAPUA (PUNCAK JAYA) 100.000.000,00 1 Peningkatan Jalan Dekai ‐ Seredala 4,00  KM 20.000.000,00 2 Pembangunan dan Peningkatan Jalan Logpond ‐ Suator ‐ Patippi 4,30  KM 20.000.000,00 g g gp pp , ,3 Peningkatan Jalan Karubaga ‐Mulia 3,40  KM 20.000.000,00 4 Pembangunan Jalan Dekai ‐ Sumohai 7,60  KM 40.000.000,00 

SATKER PELAKSANAAN JALAN NASIONAL WILAYAH VII PAPUA (NABIRE) 30.000.000,00 1 Pembangunan  Lagari ‐ Napan ‐Wapoga 4,00  KM 10.000.000,00 2 Pembangunan Jalan Wanggar ‐ Yaur 4 33 KM 20 000 000 002 Pembangunan Jalan Wanggar  Yaur 4,33  KM 20.000.000,00     

SATKER PELAKSANAAN JALAN NASIONAL WILAYAH IX PAPUA (BIAK SERUI) 90.000.000,00 1 Peningkatan Saubeba ‐Menawi + Penanganan Longsoran 4,61  KM 20.000.000,00 2 Pembangunan Jalan Saubeba ‐ Pelabuhan Yobi 1,43  KM 5.000.000,00 3 Pembangunan Jalan Yobi ‐Woda 2,86  KM 10.000.000,00 4 Pembangunan Jln Lingkar Ababiadi Murdori (Wardo Duber Sorendiweri Korido) 5 00 KM 20 000 000 004 Pembangunan Jln  Lingkar  Ababiadi ‐Murdori (Wardo ‐ Duber ‐ Sorendiweri Korido) 5,00  KM 20.000.000,00 5 Peningkatan Jalan Sumberbaba ‐ Randawaya 2,86  KM 10.000.000,00 6 Pembangunan Jalan Marioroto ‐ Ansus ‐Woi 3,26  KM 15.000.000,00 7 Pembangunan Jalan  Woi‐Poom 2,17  KM 10.000.000,00 

SATKER PENGAWASAN DAN PERENCANAAN JALAN NASIONAL PAPUA 30.000.000,00 1 Bi S K lt M j P d P DOK 30 000 000 001 Biaya Survey, Konsultan Manajemen, Perencanaan dan Pengawasan DOK 30.000.000,00 

TOTAL PROVINSI PAPUA  280.000.000,00 

NO SATUAN KERJA / PAKETSASARAN

ALOKASI DANA VOL SAT

PROVINSI : PAPUA BARATSATKER PELAKSANAAN JALAN NASIONAL WILAYAH I PAPUA BARAT (MANOKWARI)

23.750.000,00 

1 Pembangunan Jalan Saukorem ‐ Sausafor  7,50  KM 23.750.000,00 

SATKER PELAKSANAAN JALAN NASIONAL WILAYAH IV PAPUA BARAT (BINTUNI) 47.500.000,00 1 Peningkatan Jalan Bintuni ‐Mameh 4,00  KM 19.000.000,00 g2 Pembangunan Jalan Bintuni ‐ Susumuk 3,50  KM 9.500.000,00 3 Pembangunan Jalan Mameh ‐Windesi 7,50  KM 19.000.000,00 

SATKER PELAKSANAAN JALAN NASIONAL WILAYAH V PAPUA BARAT (FAKFAK) 19.000.000,00 1 Peningkatan Jalan Fakfak ‐ Bomberay ‐ Bintuni 2,80  KM 19.000.000,00 

SATKER PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI PAPUA BARAT

4.750.000,00 

Pengawasan DOK 4.750.000,00 

TOTAL PROVINSI PAPUA BARAT 95.000.000,00 

Target

AU/ AU/ PaguNilai

Dukung Realisasi Progres

F/ K/ (Rp Ribu) (Rp Ribu) (Rp Ribu) (%)

NF S Rencana

No KodeUnit Organisasi/ Satker/ Paket/

Sub Paket Kuantitas Satuan Akun Paket Keu FisikPengadaan1 04448013 BALAI BESAR PELAKSANAAN

JALAN NASIONAL X (PAPUA DAN IRJABAR) DI JAYAPURA

2 42.00 Pengadaan Jembatan Bailey dan Aramco (UP4B)

1 TON F K 0 0 30,000,000 30,000,000 0 0 0Tahunan

3 04498689 PELAKSANAAN JALAN NASIONAL WILAYAH V PROVINSI PAPUA (PUNCAK JAYA)

4 31.00 Angkutan Rangka Baja Jembatan 11 M NF K 0 0 5,567,028 5,567,028 0 0 0Tahunan

5 32.00 Rekonstruksi/Peningkatan Struktur Jalan Dekai - Seredala (UP4B)

4 KM F K 0 0 19,983,100 19,983,100 0 0 0Tahunan

6 33 00 Rekonstruksi/Peningkatan Struktur 3 KM F K 0 0 19 983 100 19 983 100 0 0 06 33.00 Rekonstruksi/Peningkatan Struktur Jalan Karubaga - Mulia (UP4B)

3 KM F K 0 0 19,983,100 19,983,100 0 0 0Tahunan

7 34.00 Pembangunan Jalan Dekai -Sumohai (UP4B)

7 KM F K 0 0 39,980,500 39,980,500 0 0 0Tahunan

8 35.00 Pembangunan Jalan Logpon -Swator - Patippi (UP4B)

4 KM F K 0 0 19,983,100 19,983,100 0 0 0Tahunan

9 04498695 PELAKSANAAN JALAN NASIONAL WILAYAH IV PROVINSI PAPUA BARAT (BINTUNI)

10 37.00 PENINGKATAN STRUKTUR JALAN BINTUNI-MAMEH (UP4B)

4(4) KM F K 18,989,400 18,989,400

18,989,400 18,989,400 0 0 0Tahunan

11 38.00 PEMBANGUNAN JALAN MAMEH- WINDESI (UP4B)

7.5(7.5) KM F K 18,989,400 18,989,400

18,989,400 18,989,400 0 0 0Tahunan

12 39.00 PEMBANGUNAN JALAN BINTUNI-SUSUMUK (UP4B)

4(4) KM F K 9,491,100 9,491,100 9,491,100 9,491,100 0 0 0TahunanBINTUNI SUSUMUK (UP4B) Tahunan

Total 47,469,90047,469,90

0 182,966,728182,966,72

8 0 0 0

Rekapitulasi Pelaksanaan Anggaran Per Paket Pekerjaan TA 2013Pengembangan Kawasan Perbatasan

No Kode Unit Organisasi/ Satker/ Paket/ Sub Paket 

Target AU/ AU/ Pagu Nilai Dukung Realisasi ProgresF/ K/ (Rp Ribu)  (Rp Ribu) (Rp Ribu) (%) 

Kuantitas Satuan NF S Akun Paket Rencana Keu FisikPengadaan

1 0449864PELAKSANAAN JALAN NASIONAL1 04498640

PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI KALTIM

2 85.00 PEMBANGUNAN JALAN BATAS KALBAR ‐ TIONG OHANG

3.54(3.54) KM F K 21.126.33021.126.330 21.126.330 016.878.706 79,89 88,05Tahunan

3 87.00 PEMBANGUNAN JALAN LONG PAHANGAI ‐ TIONG OHANG

3.54(3.54) KM F K 20.000.00020.000.000 20.000.000 014.862.642 74,31 89,90Tahunan

4 89.00 PEMBANGUNAN JALAN LONG NAWANG ‐ LONG BUJUNGAN

3.62(3.62) KM F K 21.054.09921.054.099 21.054.099 0 9.185.611 43,63 73,39Tahunan

5 0449864PELAKSANAAN JALAN NASIONAL5 04498642

PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI KALTIM

6 95.00 PPK‐17 PEMBANGUNAN JALAN LABANG ‐ TAU LUMBIS ‐ LONG BAWAN

7(7) KM F K 40.491.75340.491.753 40.491.753 40.491.753 8.098.351 20,00 66,12Tahunan

7 96.00 PPK‐18 PEMBANGUNAN JALAN MALINAU ‐ LONG BAWAN

7.69(7.69) KM F K 41.641.75341.641.753 41.641.753 41.641.75327.135.810 65,16 93,71Tahunan

8 98.00 PPK‐19 PEMBANGUNAN JALAN  4(4) KM F K 22.970.51622.970.516 22.970.516 22.970.51612.365.602 53,83 89,09MENSALONG ‐ TAU LUMBIS 2 Tahunan

9 99.00 PPK‐19 PEMBANGUNAN JALAN MENSALONG ‐ TAU LUMBIS 1

3(3) KM F K 18.135.02318.135.023 18.135.023 18.135.02313.855.136 76,40 91,79Tahunan

10 100.00 PPK‐20 PEMBANGUNAN JALAN LONG MIDANG ‐ TAU LUMBIS ‐ LABANG

7(7) KM F K 42.779.74342.779.743 42.779.743 42.779.74315.722.327 36,75 60,10Tahunan

11 101.00 PPK‐25 PEMBANGUNAN JALAN LONG PUJUNGAN ‐ LONG KEMUAT 1

3(3) KM F K 17.511.89717.511.897 17.511.897 17.511.89712.528.058 71,54 95,60Tahunan

12 102.00 PPK‐25 PEMBANGUNAN JALAN LONG  4.08(4.08) KM F K 23.717.67823.717.678 23.717.678 23.717.67819.671.931 82,94 86,34PUJUNGAN ‐ LONG KEMUAT 2 Tahunan

13 103.00 PPK‐26 PEMBANGUNAN JALAN LONG KEMUAT ‐ LANGAP ‐MALINAU

7.08(7.08) KM F K 40.782.61940.782.619 40.782.619 40.782.61923.408.771 57,40 62,00Tahunan

14 104.00 PPK‐26 PEMBANGUNAN JALAN LONG KEMUAT ‐ LANGAP

7(7) KM F K 40.388.46240.388.462 40.388.462 40.388.46224.190.469 59,89 71,24Tahunan

15 105.00 PPK‐18 PEMBANGUNAN JEMBATAN MALINAU ‐ LONG BAWAN CS

60(60) M F K 10.582.14010.582.140 10.582.140 10.582.140 6.316.578 59,69 100,00Tahunan

16 106.00 PPK‐20 PEMBANGUNAN JEMBATAN  50(50) M F K 7.962.858 7.962.858 7.962.858 7.962.858 4.492.089 56,41 100,00

68

SEI ULAR CS( ) , ,

TahunanTotal 369.144.871369.144.87

1369.144.871 306.964.442208.712.07

956,54 78,69

Rekapitulasi Pelaksanaan Anggaran Per Paket Pekerjaan TA 2013Rehab Pasca Bencana

KEMENTERIAN PEKERJAAN UMUM

Target

AU/ AU/ PaguNilai

Dukung Realisasi Progres

F/ K/ (Rp Ribu) (Rp Ribu) (Rp Ribu) (%)

NF S Rencana

No KodeUnit Organisasi/ Satker/

Paket/ Sub Paket Kuantitas Satuan Akun Paket Keu FisikPengadaan1 0449863

6PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI KALTENG

2 16.00 PPK 02 PENINGKATAN 6(6) KM F K 27,034,283 27,034,283 27,034,283 0 19,734,468 73 97.31STRUKTUR JALAN RUAS RUNTU - SIMP. RUNTU -KUJAN - PENOPA

Tahunan

3 17.00 PPK 03 PENINGKATAN STRUKTUR RUAS JALAN PANGKALAN BUN

6(6) KM F K 19,583,155 19,583,155 19,583,155 0 8,246,488 42.11 72.69Tahunan

PANGKALAN BUN -PANGKALAN LADA -ASAM BARU

Total 46,617,438 46,617,438 46,617,438 0 27,980,956 60.02 86.97

69

RENCANA DUKUNGAN INFRASTRUKTUR TERHADAP MP3EI TA. 2013No Provinsi Jumlah

(Alokasi dalm Jutaan)

1 ACEH                                                                    85,969 2 SUMATERA UTARA 581 5722 SUMATERA UTARA                                                          581,572 3 RIAU                                                                    525,347 4 JAMBI                                                                   77,799 5 SUMATERA SELATAN                                                        62,987 6 BANGKA BELITUNG                                                         1,490 7 DKI JAKARTA                                                             510,406 8 BANTEN                                                                  71,495 9 JAWA BARAT                                                              648,999 10 JAWA TENGAH                                                             790,288 11 JAWA TIMUR                                                              75,656 12 KALIMANTAN BARAT                                                        485,924 1313 KALIMANTAN TENGAH                                                       131,793 14 KALIMANTAN TIMUR                                                        1,007,025 15 BALI                                                                    67,012 16 NUSA TENGGARA BARAT                                                     155,484 17 NUSA TENGGARA TIMUR                                                     146,235 18 SULAWESI UTARA                                                          112,630 SU S U ,63019 SULAWESI TENGAH                                                         136,429 20 SULAWESI BARAT                                                          122,462 21 SULAWESI SELATAN                                                        378,120 22 SULAWESI TENGGARA                                                       325,762 23 MALUKU                                                                  37,296 24 MALUKU UTARA                                                            56,586 25 PAPUA                                                                   1,234,095 26 PAPUA BARAT                                                             678,656 27 BINA MARGA PUSAT                                                        909,823 

TOTAL 9,417,337 

Rekapitulasi Pelaksanaan Anggaran Per Paket Pekerjaan TA 2013Masterplan Percepatan Perluasan Pembangunan Ekonomi Indonesia (MP3EI)

KEMENTERIAN PEKERJAAN UMUM

No KodeUnit Organisasi/ Satker/

Paket/ Sub Paket

TargetAU/ AU/ Pagu

Nilai Dukung Realisasi Progres

F/ K/ (Rp Ribu) (Rp Ribu) (Rp Ribu) (%)

Kuantitas SatuanNF S

Akun PaketRencana

Keu FisikPengadaan0402951 DINAS BINA MARGA PROV.

1 5 JAWA BARAT2 5.00 SEWA GEDUNG 5(1) BUAH AU AU 310,000 310,000 310,000 0 310,000 100 1003 6.00 SEWA KENDARAAN (INDUK) 600(1) HARI AU AU 390,000 390,000 390,000 0 390,000 100 100

4 7.00 ADMINISTRASI KEGIATAN (INDUK) 12(1) BULAN AU AU 388,821 388,821 388,821 0 305,590 78.59 78.59

5 10.00HONOR PENANGGUNG JAWAB PENGELOLA KEUANGAN (INDUK)

12(1) BULAN AU AU 140,280 140,280 140,280 0 81,830 58.33 58.33

6 13.00 HONOR TIM PELAKSANA KEGIATAN (INDUK) 12(1) BULAN AU AU 16,200 16,200 16,200 0 13,490 83.27 83.27

7 14.00 MONITORING DAN EVALUASI (INDUK) 12(1) BULAN AU AU 214,400 214,400 214,400 0 89,948 41.95 41.95

8 19.00SEWA KENDARAAN (PK PELAKSANAAN JALAN CIREBON-CIKIJING)

12(1) BULAN AU AU 180,000 180,000 180,000 0 180,000 100 100

ADMINISTRASI KEGIATAN 9 20.00 (PK PELAKSANAAN JALAN

CIREBON-CIKIJING)12(1) BULAN AU AU 252,840 252,840 252,840 0 138,193 54.66 54.66

10 22.00

HONOR TIM PELAKSANA KEGIATAN (PK PELAKSANAAN JALAN CIAMIS-CIKIJING)

12(1) BULAN AU AU 10,800 10,800 10,800 0 6,300 58.33 58.33

11 25.00SEWA KENDARAAN (PK PELAKSANAAN JALAN 12(1) BULAN AU AU 180,000 180,000 180,000 0 180,000 100 100CIAMIS-CIKIJING)

12 26.00ADMINISTRASI KEGIATAN (PK PELAKSANAAN JALAN CIAMIS-CIKIJING)

12(1) BULAN AU AU 252,840 252,840 252,840 0 121,707 48.14 48.14

13 27.00

HONOR PENANGGUNG JAWAB PENGELOLA KEUANGAN (PK PELAKSANAAN JEMBATAN C O G

12(1) BULAN AU AU 28,080 28,080 28,080 0 16,380 58.33 58.33

71

CIREBON-KUNINGAN-CIAMIS)

14 28.00

HONOR TIM PELAKSANA KEGIATAN (PK PELAKSANAAN JEMBATAN CIREBON-KUNINGAN-CIAMIS)

12(1) BULAN AU AU 10,800 10,800 10,800 0 6,300 58.33 58.33

No KodeUnit Organisasi/ Satker/

Paket/ Sub Paket

TargetAU/ AU/ Pagu

Nilai Dukung Realisasi Progres

F/ K/ (Rp Ribu) (Rp Ribu) (Rp Ribu) (%)

Kuantitas SatuanNF S

Akun PaketRencana

Keu FisikPengadaanSEWA KENDARAAN (PK

15 30.00 PELAKSANAAN JEMBATAN CIREBON-KUNINGAN-CIAMIS)

400(1) HARI AU AU 180,000 180,000 180,000 0 180,000 100 100

16 31.00ADMINISTRASI KEGIATAN (PK PELAKSANAAN JEMBATAN CIREBON-KUNINGAN-CIAMIS)

12(1) BULAN AU AU 252,840 252,840 252,840 0 114,000 45.09 45.09

17 32.00

PEMELIHARAAN BERKALA/REHABILITASI JALAN RUAS JALAN SNR 2(2) KM F S 4,373,645 4,373,645 4,373,645 0 3,940,957 90.11 91.02

PROVINSI JAWA BARAT

18 33.00PEMELIHARAAN BERKALA/REHABILITASI JALAN CIREBON-CIKIJING

7.5(7.5) KM FK

13,523,600 13,523,600 13,523,600 0 12,642,179 93.48 99.81Tahunan

19 33.1

PEMELIHARAAN BERKALA/REHABILITASI JALAN CIREBON-CIKIJING 7.5 KM F K 13,498,000 13,498,000 13,498,000 13,498,000 12,631,579 93.58 100

Tahunan

20 34.00PEMELIHARAAN BERKALA /REHABILITASI JEMBATAN CIKONENG

20(20) M F S 828,600 828,600 828,600 0 501,048 60.47 60.5

21 35.00PEMELIHARAAN BERKALA/REHABILITASI JEMBATAN CIGEDE CS.

55(55) M FK

9,043,600 9,043,600 9,043,600 0 5,356,029 59.22 75.29Tahunan

22 35 1

PEMELIHARAAN BERKALA/REHABILITASI 55 M F K 9 018 000 9 018 000 9 018 000 9 018 000 5 345 429 59 28 75 522 35.1 JEMBATAN CIGEDE CS. 55 M F 9,018,000 9,018,000 9,018,000 9,018,000 5,345,429 59.28 75.5

Tahunan

23 36.00 PEMBANGUNAN JALAN BARU SENTUL-PUNCAK 18(18) KM F K 33,476,815 33,476,815 33,476,815 0 16,974,964 50.71 40.42Tahunan

24 36.1PEMBANGUNAN JALAN BARU SENTUL-PUNCAK 18 KM F K 33,451,215 33,451,215 33,451,215 33,451,215 16,964,364 50.71 40.45

TahunanPEMELIHARAAN

/ S ( )K

72

25 37.00 BERKALA/REHABILITASI JALAN CIKIJING-CIAMIS

8(8) KM F 13,599,600 13,599,600 13,599,600 0 12,388,773 91.1 99.81Tahunan

26 37.1

PEMELIHARAAN BERKALA/REHABILITASI JALAN CIKIJING-CIAMIS 8 KM F K 13,574,000 13,574,000 13,574,000 13,574,000 12,378,173 91.19 100

Tahunan

37 27.00001. RUTIN JALAN SUDIRMAN (BALIKPAPAN) (008.11)

2.57(2.57) KM F S 76,840 76,840 76,840 0 38,418 50 55

002. RUTIN JALAN S ( ) ( ) S38 28.00 ISWAHYUDI (BALIKPAPAN)

(008.12)4.06(4.06) KM F S 121,890 121,890 121,890 0 0 0 55

39 29.00003. RUTIN JALAN SYARIFUDDIN YOES (JL. KE AIRPORT) (008.13)

0.69(0.69) KM F S 20,550 20,550 20,550 0 0 0 55

40 30.00004. RUTIN JALAN MT. HARYONO (BALIKPAPAN) (008.14)

2.75(2.75) KM F S 82,500 82,500 82,500 0 34,422 41.72 55

PEMELIHARAAN BERKALA K41 36.00 PEMELIHARAAN BERKALA JALAN SUDIRMAN 5(5) KM F K 9,540,073 9,540,073 9,540,073 9,540,073 7,236,285 75.85 91.28Tahunan

42 36.1BERKALA JALAN SUDIRMAN (BALIKPAPAN) (008.11) 0 KM F K 9,540,073 9,540,073 9,540,073 0 7,236,285 75.85 91.28

Tahunan

43 37.00 PEMELIHARAAN BERKALA JALAN SYARIFUDDIN YOES 4.75(4.75) KM F K 8,981,296 8,981,296 8,981,296 8,981,296 6,111,823 68.05 73.36TahunanBERKALA JALAN SYARIFUDDIN YOES (JL KE

44 37.1SYARIFUDDIN YOES (JL. KE AIRPORT) (BALIKPAPAN) (008.13)

0 KM F K 8,981,296 8,981,296 8,981,296 0 6,111,823 68.05 73.36

Tahunan45 40.00 BIAYA LELANG 0 PKT AU AU 16,490 16,490 16,490 0 16,450 99.76 100

46 41.00PELEBARAN JALAN LOA JANAN - BTS KOTA SAMARINDA

3(3) KM FK

11,085,359 11,085,359 11,085,359 11,085,359 4,362,868 39.36 32.02Tahunan

LOA JANAN BTS KOTA

47 41.1

LOA JANAN - BTS KOTA SAMARINDA (LIPAN HILL) (SAMARINDA) (010) 3 KM F K 11,085,359 11,085,359 11,085,359 0 4,362,868 39.36 32.02

Tahunan48 42.00 BIAYA LELANG PELEBARAN 0 PKT AU AU 2,450 2,450 2,450 0 2,440 99.59 100

49 43.00PEMELIHARAAN BERKALA JALAN UNTUNG SUROPATI -SLAMET RIYADI

4.05(4.05) KM FK

7,535,473 7,535,473 7,535,473 7,535,473 4,772,149 63.33 59.16Tahunan

73

50 43.1

BERKALA JALAN UNTUNG SUROPATI - SLAMET RIYADI (SAMARINDA) 0 KM F K 7,535,473 7,535,473 7,535,473 0 4,772,149 63.33 59.16

Tahunan

51 44.00PEMELIHARAAN BERKALA JALAN RE. MARTADINATA - GAJAH MADA - YOS SUDARSO

3.49(3.49) KM FK

6,601,335 6,601,335 6,601,335 6,601,335 3,958,041 59.96 75.24Tahunan

52 44.1

PEMELIHARAAN BERKALA JALAN RE. MARTADINATA - GAJAH MADA - YOS SUDARSO 0 KM F K 6,601,335 6,601,335 6,601,335 0 3,958,041 59.96 75.24

Tahunan

53 45.00 PEMELIHARAAN BERKALA JALAN M. NUR -DI. PANJAITAN - SP.3 SAMBERA 6.41(6.41) KM F K 12,576,505 12,576,505 12,576,505 12,576,505 7,924,553 63.01 62.83

Tahunan

54 45.1BERKALA JALAN M. NUR - DI. PANJAITAN -SP.3 SAMBERA 0 KM F K 12,576,505 12,576,505 12,576,505 0 7,924,553 63.01 62.83

Tahunan

55 46.00 PEMELIHARAAN BERKALA JALAN S. PARMAN - BRIGJEN KATAMSO 4.62(4.62) KM F K 8,213,186 8,213,186 8,213,186 8,213,186 7,216,333 87.86 98.56Tahunan

56 46.1BERKALA JALAN S. PARMAN - BRIGJEN KATAMSO 0 KM F K 8,213,186 8,213,186 8,213,186 0 7,216,333 87.86 98.56, , , , , , , ,

Tahunan

57 47.00PEMELIHARAAN BERKALA JALAN MT. HARYONO - LETJEN SUPRAPTO - DI. PANJAITAN - KAPTEN TENDEAN

4.41(4.41) KM FK

7,945,613 7,945,613 7,945,613 7,945,613 6,554,989 82.5 97.03Tahunan

58 47.1

BERKALA JALAN MT. HARYONO - LETJEN SUPRAPTO - DI. PANJAITAN - KAPTEN TENDEAN 0 KM F K 7,945,613 7,945,613 7,945,613 0 6,554,989 82.5 97.03

TahunanHONOR PANITIA PENGADAAN

59 48.00 KONSTRUKSI PEMELIHARAAN BERKALA JALAN

0 OP AU AU 89,600 89,600 89,600 0 89,600 100 100

60 49.00HONOR PANITIA PENGADAAN KONSTRUKSI PELEBARAN JALAN LOA JANAN - BTS KOTA SAMARINDA

0 OP AU AU 14,840 14,840 14,840 0 14,840 100 100

61 04249016

DINAS PEKERJAAN UMUM PROP. NUSA TENGGARA TIMUR

62 1.00 PEMELIHARAAN RUTIN JALAN DALAM KOTA KUPANG (PPK 01) 22.5(22.5) KM F S 2,479,121 2,479,121 2,479,121 0 1,045,796 42.18 55.54

63 2.00 PEMELIHARAAN RUTIN JEMBATAN DALAM KOTA KUPANG (PPK 01)

441.3(441.3) KM F S 509,313 509,313 509,313 0 221,613 43.51 45.2

64 3.00 PEMELIHARAAN BERKALA JALAN DALAM KOTA KUPANG 2.2(2.2) KM F K 4,375,980 4,375,980 4,375,980 0 3,459,810 79.06 99.48Tahunan

65 4.00 (SBK)-SISTEM PELAPORAN SECARA ELEKTRONIK (e-MONITORING) 28(28) LAP AU AU 22,400 22,400 22,400 0 12,800 57.14 57.14

66 5.00 Eksploitasi Operasional Kantor 12(12) BULAN AU AU 308,200 308,200 308,200 0 122,087 39.61 39.6167 6.00 Langganan Daya dan Jasa 12(12) BULAN AU AU 58,560 58,560 58,560 0 29,133 49.75 49.7568 7.00 Perjalanan Dinas 12(12) BULAN AU AU 1,045,350 1,045,350 1,045,350 0 420,332 40.21 40.21

PEMELIHARAAN DAN PEREMAJAAN

74

69 8.00 PEMELIHARAAN DAN PEREMAJAAN SOFTWARE/HARDWARE KOMPUTER 12(12) BULAN AU AU 30,000 30,000 30,000 0 9,145 30.48 30.48

70 9.00 SEWA KENDARAAN 12(12) BULAN AU AU 132,480 132,480 132,480 0 62,100 46.88 46.88

71 10.00 HONORARIUM PENANGGUNG JAWAB KEUANGAN 12(12) BULAN AU AU 108,600 108,600 108,600 0 63,350 58.33 58.33

72 11.00 HONORARIUM PENGELOLA SAI DAN PETUGAS GUDANG 12(12) BULAN AU AU 16,800 16,800 16,800 0 4,900 29.17 29.17

73 04299030

DINAS BINA MARGA DAN TATA RUANG PROVINSI BANTEN

74 2.00 PEMELIHARAAN RUTIN JALAN PPK RCCB

32.12(32.12) KM F S 1,927,200 1,927,200 1,927,200 0 1,459,250 75.72 75.72

75 4 00PEMELIHARAAN BERKALA/REHABILITASI JALAN 8 5(8 5) KM F

K16 371 311 16 371 311 16 371 311 0 13 261 166 81 99 5675 4.00 BERKALA/REHABILITASI JALAN

PPK MBBC8.5(8.5) KM F 16,371,311 16,371,311 16,371,311 0 13,261,166 81 99.56Tahunan

76 4.1Paket Pemeliharaan Berkala Jalan Serdang-Bojonegara-Merak 3 KM F K 5,215,812 5,215,812 5,215,812 5,215,812 3,820,582 73.25 100

Tahunan

77 4.2Paket Pemeliharaan Berkala Jalan Tangerang-Serpong 2 KM F K 5,555,419 5,555,419 5,555,419 0 5,277,648 95 100

TahunanPaket Pemeliharaan Berkala Jalan

78 4.3Paket Pemeliharaan Berkala Jalan Cikande-Rangkasbitung 3.5 KM F K 5,527,480 5,527,480 5,527,480 0 4,090,335 74 100

Tahunan

79 5.00 PEMELIHARAAN RUTIN JALAN PPK MBBC

60.33(60.33) KM F S 3,619,320 3,619,320 3,619,320 0 2,930,580 80.97 80.97

80 7.00PEMELIHARAAN BERKALA/REHABILITASI JALAN PPK RCCB

8.12(8.12) KM FK

12,076,514 12,076,514 12,076,514 0 9,685,508 80.2 99.6Tahunan

Paket Pemeliharaan Berkala Jalan

81 7.1

Paket Pemeliharaan Berkala Jalan Sunan Kalijaga dan Jalan Raya Cipanas (Rangkasbitung) 4.12 KM F K 6,249,792 6,249,792 6,249,792 0 4,927,961 78.85 100

Tahunan

82 7.2

Paket Pemeliharaan Berkala Jalan Bts. Kota Rangkasbitung-Cigelung (Bts. Prov. Jabar) 4 KM F K 5,778,322 5,778,322 5,778,322 0 4,709,147 81.5 100

TahunanADMINISTRASI KEGIATAN83 14.00 ADMINISTRASI KEGIATAN (INDUK) 12(12) BULAN AU AU 1,183,220 1,183,220 1,183,220 0 743,452 62.83 62.83

84 15.00 ADMINISTRASI KEGIATAN PPK MBBC 12(12) BULAN AU AU 360,040 360,040 360,040 0 234,890 65.24 65.24

85 16.00 ADMINISTRASI KEGIATAN PPK RCCB 12(12) BULAN AU AU 360,040 360,040 360,040 0 235,690 65.46 65.46

86 31.00 PEMELIHARAAN RUTIN JEMBATAN PPK MBBC 647(647) KM F S 970,500 970,500 970,500 0 678,013 69.86 69.86

PEMELIHARAAN RUTIN

75

87 32.00 PEMELIHARAAN RUTIN JEMBATAN PPK RCCB 83(83) M F S 124,500 124,500 124,500 0 0 0 0

88 04447919 PELAKSANAAN JALAN BEBAS HAMBATAN TANJUNG PRIOK

89 29.00001. Pembangunan Jalan Akses Tol Cimanggis-Nagrak Tahap 3 (3.85 Km)

3.85(3.85) KM FK

47,469,709 47,469,709 47,469,709 0 13,649,306 28.75 23.22Tahunan

001 Pembangunan Jalan Akses Tol

90 29.1

001. Pembangunan Jalan Akses Tol Cimanggis-Nagrak Tahap 3 (3.85 Km) 3.85 KM F K 54,020,000 54,020,000 54,020,000 0 13,649,306 25.27 20

Tahunan91 30.00 Pembebasan Tanah 0 KM F S 53,651,254 53,651,254 53,651,254 0 1,142,356 2.13 2.13

92 32.00 Pembangunan Jalan Tol Akses Tanjung Priok Seksi E2 0.73(0.73) KM F

K355,568,000 355,568,000 355,568,000 0 144,875,268 40.74 32.77MYC Lanjut

anPembangunan Jalan Tol Akses Tanjung Priok Seksi E2 K

93 32.1 Tanjung Priok Seksi E2 0.73 KM F 138,500,000 138,500,000 138,500,000 0 144,875,268 104.6 45.65MYC Lanjutan

94 04447993BALAI PELAKSANAAN JALAN NASIONAL VIII (BALI,NTB,NTT) DI DENPASAR

95 9.00Dokumen lingkungan jalan dan jembatan, AMDAL/UKL/UPL BPJN VIII

1(1) DOK NFK

917,765 917,765 917,765 0 139,321 15.18 34.12Tahunan

Dokumen lingkungan jalan dan

96 9.1

g g jjembatan, AMDAL/UKL/UPL BPJN VIII 1 DOK NF K 904,805 904,805 987,040 0 135,721 15 34.6

Tahunan

97 47.00 Feasibility Study di Lingkungan BPJN VIII 1(1) DOK F K 1,479,266 1,479,266 1,479,266 0 292,669 19.78 29.5Tahunan

98 47.1Paket FS + UKL/UPL Sepanjang Jalan Gatsu (under pass) 1 DOK F K 730,656 730,656 762,540 0 140,731 19.26 30

TahunanPaket FS. Tukad Teba ruas jalan K99 47.2 Denpasar - Tuban (IMAM Bonjol) 1 DOK F K 723,690 723,690 1,572,000 0 144,738 20 30

Tahunan

100 48.00 Uji dan Evaluasi Laik Fungsi Jalan di Wilayah BPJN VIII 1(1) DOK NF S 843,190 843,190 843,190 0 14,303 1.7 38.3

101 49.00 Akreditasi Laboratorium 1(1) DOK NF S 545,300 545,300 545,300 0 18,008 3.3 40

102 50.00Diseminasi Pembinaan Kemampuan SDM PPK bidang Peralatan Jalan & Jembatan di BALI,NTB,dan NTT

1(1) DOK NF S 290,000 290,000 290,000 0 202,684 69.89 100

103 51 00 Diskusi Teknis Kemampuan SDM 1(1) DOK NF S 298 000 298 000 298 000 0 224 549 75 35 100

76

103 51.00 Bidang Penilik Jalan dan Jembatan 1(1) DOK NF S 298,000 298,000 298,000 0 224,549 75.35 100

104 52.00 Diseminasi/Sosialisasi SIMKA di Lingkungan BPJN VIII 1(1) DOK NF S 298,000 298,000 298,000 0 0 0 20

105 53.00 Bimbingan Teknis Pengadaan Barang dan Jasa 1(1) DOK NF S 580,000 580,000 580,000 0 318,798 54.97 100

106 54.00 Diskusi Teknis di Bidang Perencanaan Jalan 1(1) DOK NF S 250,000 250,000 250,000 0 224,496 89.8 100

107 55.00 Diseminasi Pelatihan Teknik Laboratorium 1(1) DOK NF S 298,000 298,000 298,000 0 217,533 73 100

108 56.00 Unit Penjamin Mutu Balai Pelaksanaan Jalan Nasional VIII 1(1) DOK NF S 169,250 169,250 169,250 0 0 0 20

109 57.00 PEMBINAAN ADMINISTRASI KETATA USAHAAN 1(1) DOK NF S 682,440 682,440 682,440 0 441,240 64.66 64.66

110 58.00 Pembinaan Dan Tindak Lanjut Hasil-Hasil Pemeriksaan (LHP) 1(1) DOK NF S 46,800 46,800 46,800 0 9,900 21.15 39.25

111 59 00 R t K di i T i l 1(1) DOK NF S 591 870 591 870 591 870 0 149 840 25 32 65111 59.00 Rapat Koordinasi Triwulan 1(1) DOK NF S 591,870 591,870 591,870 0 149,840 25.32 65112 60.00 Pengelola Website 1 DOK NF S 316,200 316,200 316,200 0 0 0 30

113 61.00 Konsultan Manajemen Proyek (KMP) 1(1) DOK NF K 3,000,000 3,000,000 3,000,000 0 552,077 18.4 49.72Tahunan114 61.1 004. Konsultan Manajemen Proyek

(KMP) di Wilayah BPJN VIII1 DOK NF K 2,984,320 2,984,320 2,984,320 0 546,627 18.32 50

Tahunan115 62.00 Monitoring Evaluasi Bali, NTB, NTT 1(1) DOK NF S 938,334 938,334 938,334 0 465,429 49.6 49.6116 63.00 Penelusuran Barang Milik Negara 1(1) DOK NF S 160,620 160,620 160,620 0 84,796 52.79 52.79117 64 00 Pen s nan Lakip BPJN VIII 1(1) DOK NF S 246 400 246 400 246 400 0 226 390 91 88 100117 64.00 Penyusunan Lakip BPJN VIII 1(1) DOK NF S 246,400 246,400 246,400 0 226,390 91.88 100

118 65.00 Pengadaan Alat Laboratorium 7 UNIT F K 1,941,535 1,941,535 1,941,535 0 1,934,035 99.61 99.17Tahunan119 65.1 Paket Pengadaan Alat Laboratorium (7

UNIT)7 UNIT F K 1,925,375 1,925,375 2,000,000 0 1,925,375 100 100

Tahunan120 67.00 Pengadaan Bronjong Bergalvanis,

Armco, Jembatan Bailey6420 UNIT NF K 2,500,000 2,500,000 2,500,000 0 0 0 24.77

Tahunan121 67.1 Paket Pengadaan Bahan Jalan dan

Jembatan Bronjong Bergalvanis (36420 UNIT NF K 2,483,840 2,483,840 2,500,000 0 0 0 25

Jembatan Bronjong Bergalvanis (3 Provinsi) (6420 UNIT)

Tahunan122 68.00 Pengadaan Alat Suku Cadang Alat

Berat dan Perbaikan UPR/DRU40(40) UNIT F K 9,422,106 9,422,106 9,422,106 0 1,888,905 20.05 49.88

Tahunan123 69.00 Pembuatan Sistem E-Office BPJN VIII 1(1) DOK NF K 1,063,299 1,063,299 1,063,299 0 594,116 55.87 62.28

Tahunan124 69.1 Paket Pembuatan Sistem E-Office BPJN

VIII1 DOK NF K 1,050,249 1,050,249 1,177,000 0 590,366 56.21 63.05

TahunanTahunan125 71.00 Pembayaran Gaji dan Tunjangan 12(12) BULAN AU AU 39,398,600 39,398,600 39,398,600 0 24,339,971 61.78 61.78126 72.00 Keperluan Sehari - Hari 12 BULAN AU AU 646,954 646,954 646,954 0 243,298 37.61 37.61127 73.00 Administrasi Umum dan Operasional

Pimpinan12 BULAN AU AU 10,138,311 10,138,311 10,138,311 0 5,656,674 55.8 55.8

128 74.00 Honorarium Pengelola Sistem Akuntansi Instansi

12 BULAN AU AU 54,000 54,000 54,000 0 27,000 50 50

129 76.00 Honorarium Pejabat/Panitia Pengadaan Barang dan Jasa

12 BULAN AU AU 6,120 6,120 6,120 0 3,060 50 50

130 77.00 Pengadaan Meubelair Arsip/Gudang 1(1) UNIT F K 262,890 262,890 262,890 0 255,390 97.15 95.21

77

g p g ( ) , , , ,Tahunan

131 78.00 Pengadaan Alat Pengolah Data 1(1) UNIT F S 400,000 400,000 400,000 0 0 0 30132 79.00 Pembuatan Sertifikat Tanah Jalan 1(1) UNIT NF S 674,516 674,516 674,516 0 0 0 10133 84.00 Persiapan dan Pemutakhiran Data

Dasar12 BULAN AU AU 17,400 17,400 17,400 0 8,700 50 65

134 85.00 Pencatatan dan Pemutakhiran Data Pelaksanaan

12 BULAN AU AU 3,344 3,344 3,344 0 0 0 65

135 86.00 Penyusunan dan Pencetakan Laporan 28(28) LAP AU AU 6,130 6,130 6,130 0 0 0 65

125 71.00 Pembayaran Gaji dan Tunjangan 12(12) BULAN AU AU 39,398,600 39,398,600 39,398,600 0 24,339,971 61.78126 72.00 Keperluan Sehari - Hari 12 BULAN AU AU 646,954 646,954 646,954 0 243,298 37.61127 73.00 Administrasi Umum dan Operasional Pimpinan 12 BULAN AU AU 10,138,311 10,138,311 10,138,311 0 5,656,674 55.8128 74.00 Honorarium Pengelola Sistem Akuntansi

Instansi12 BULAN AU AU 54,000 54,000 54,000 0 27,000 50

129 76.00 Honorarium Pejabat/Panitia Pengadaan Barang dan Jasa

12 BULAN AU AU 6,120 6,120 6,120 0 3,060 50

130 77 00 Pengadaan Meubelair Arsip/Gudang 1(1) UNIT F K 262 890 262 890 262 890 0 255 390 97 15130 77.00 Pengadaan Meubelair Arsip/Gudang 1(1) UNIT F K 262,890 262,890 262,890 0 255,390 97.15Tahunan

131 78.00 Pengadaan Alat Pengolah Data 1(1) UNIT F S 400,000 400,000 400,000 0 0 0132 79.00 Pembuatan Sertifikat Tanah Jalan 1(1) UNIT NF S 674,516 674,516 674,516 0 0 0133 84.00 Persiapan dan Pemutakhiran Data Dasar 12 BULAN AU AU 17,400 17,400 17,400 0 8,700 50134 85.00 Pencatatan dan Pemutakhiran Data

Pelaksanaan12 BULAN AU AU 3,344 3,344 3,344 0 0 0

135 86.00 Penyusunan dan Pencetakan Laporan 28(28) LAP AU AU 6,130 6,130 6,130 0 0 0136 0447173

5PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI JAWATIMUR

137 1.00 001. Core Team 1(1) DOK NF K 900,000 900,000 900,000 0 302,206 33.58Tahunan

138 1.1 001. Core Team 1 DOK NF K 900,000 900,000 900,000 0 302,206 33.58Tahunan

139 2.00 PENGUMPULAN DATA JALAN DAN JEMBATAN

5(5) DOK NF S 724,648 724,648 724,648 0 255,110 35.2

140 3.00 PERENCANAAN TEKNIK JALAN DAN JEMBATAN JAWA TIMUR PAKET 1

1(1) DOK NF K 508,895 508,895 508,895 0 5,040 0.99Tahunan

141 3.1 PERENCANAAN TEKNIK JALAN DAN 1 DOK NF K 503,855 503,855 503,855 0 0 0JEMBATAN JAWA TIMUR PAKET 1

Tahunan142 4.00 PERENCANAAN TEKNIK JALAN DAN

JEMBATAN JAWA TIMUR PAKET 21(1) DOK NF K 568,130 568,130 568,130 0 207,532 36.53

Tahunan143 4.1 PERENCANAAN TEKNIK JALAN DAN

JEMBATAN JAWA TIMUR PAKET 21 DOK NF K 563,090 563,090 563,090 0 202,492 35.96

Tahunan144 5.00 PERENCANAAN TEKNIK JALAN DAN

JEMBATAN JAWA TIMUR PAKET 31(1) DOK NF K 512,998 512,998 512,998 0 5,040 0.98

Tahunan145 5 1 PERENCANAAN TEKNIK JALAN DAN 1 DOK NF K 507 958 507 958 507 958 0 0 0145 5.1 PERENCANAAN TEKNIK JALAN DAN

JEMBATAN JAWA TIMUR PAKET 31 DOK NF K 507,958 507,958 507,958 0 0 0

Tahunan146 6.00 PERENCANAAN TEKNIK JALAN DAN

JEMBATAN JAWA TIMUR PAKET 41(1) DOK NF K 560,540 560,540 560,540 0 116,140 20.72

Tahunan147 6.1 PERENCANAAN TEKNIK JALAN DAN

JEMBATAN JAWA TIMUR PAKET 41 DOK NF K 555,500 555,500 555,500 0 111,100 20

Tahunan148 7.00 PERENCANAAN TEKNIK JALAN DAN

JEMBATAN JAWA TIMUR PAKET 51(1) DOK NF K 645,559 645,559 645,559 0 5,040 0.78

Tahunan

78

JEMBATAN JAWA TIMUR PAKET 5 Tahunan149 7.1 PERENCANAAN TEKNIK JALAN DAN

JEMBATAN JAWA TIMUR PAKET 51 DOK NF K 640,519 640,519 640,519 0 0 0

Tahunan150 8.00 Pengawasan PEMB.JEMBATAN Kalimujur

(MYC)1(1) DOK NF K 643,236 643,236 1,558,161 0 0 0

MYC Lanjutan

151 8.1 Pengawasan PEMB.JEMBATAN Kalimujur (MYC)

1 DOK NF K 643,236 643,236 1,558,161 0 0 0 0

MYC Lanjutan

152 9.00 PENGAWASAN PEMB.JEMBATAN TRISULA (MYC)

1(1) DOK NF K 543,710 543,710 1,971,277 0 0 0 0MYC Lanj

utan153 9.1 PENGAWASAN

PEMB.JEMBATAN TRISULA (MYC)

1 DOK NF K 543,710 543,710 1,971,277 0 0 0 0

MYC Lanjutan

154 10.00 PENGAWASAN TEKNIK JALAN DAN JEMBATAN REGULER I

1(1) DOK NF K 2,085,040 2,085,040 2,085,040 0 845,061 40.53 74.52Tahunan

155 10.1 PENGAWASAN TEKNIK JALAN DAN JEMBATAN REGULER I

1 DOK NF K 2,078,670 2,078,670 2,078,670 0 838,691 40.35 74.44

Tahunan156 11.00 PENGAWASAN TEKNIK 1(1) DOK NF K 1,613,910 1,613,910 1,613,910 0 611,944 37.92 74.21

JALAN DAN JEMBATAN REGULER II

( )Tahunan

157 11.1 PENGAWASAN TEKNIK JALAN DAN JEMBATAN REGULER II

1 DOK NF K 1,607,540 1,607,540 1,607,540 0 605,574 37.67 74.11

Tahunan158 12.00 PENGAWASAN TEKNIK

JALAN DAN JEMBATAN 1(1) DOK NF K 1,386,545 1,386,545 1,386,545 0 836,002 60.29 75

TahunanREGULER III

159 12.1 PENGAWASAN TEKNIK JALAN DAN JEMBATAN REGULER III

1 DOK NF K 1,380,175 1,380,175 1,380,175 0 829,632 60.11 74.88

Tahunan160 13.00 PENGAWASAN TEKNIK

JALAN DAN JEMBATAN REGULER IV

1(1) DOK NF K 1,590,370 1,590,370 1,590,370 0 854,771 53.75 56.94Tahunan

79

161 13.1 PENGAWASAN TEKNIK JALAN DAN JEMBATAN REGULER IV

1 DOK NF K 1,584,000 1,584,000 1,584,000 0 848,401 53.56 56.77

Tahunan162 14.00 PENGAWASAN TEKNIK

JALAN DAN JEMBATAN REGULER V

1(1) DOK NF K 1,115,555 1,115,555 1,115,555 0 919,821 82.45 79.67Tahunan

163 14.1 PENGAWASAN TEKNIK JALAN DAN JEMBATAN REGULER V

1 DOK NF K 1,109,185 1,109,185 1,109,185 0 913,451 82.35 79.55

Tahunan164 15.00 PENGAWASAN TEKNIK JALAN DAN

JEMBATAN REGULER VI1(1) DOK NF K 2,162,920 2,162,920 2,162,920 0 912,941 42.21 82.16

Tahunan165 15.1 PENGAWASAN TEKNIK JALAN DAN

JEMBATAN REGULER VI1 DOK NF K 2,156,550 2,156,550 2,156,550 0 906,570 42.04 82.11

TahunanTahunan166 16.00 PENGAWASAN TEKNIK JALAN DAN

JEMBATAN REGULER VII1(1) DOK NF K 1,452,375 1,452,375 1,452,375 0 295,571 20.35 79.98

Tahunan167 16.1 PENGAWASAN TEKNIK JALAN DAN

JEMBATAN REGULER VII1 DOK NF K 1,446,005 1,446,005 1,446,005 0 289,201 20 79.89

Tahunan168 17.00 PENGAWASAN TEKNIK JALAN DAN

JEMBATAN REGULER VIII1(1) DOK NF K 2,062,600 2,062,600 2,062,600 0 1,066,697 51.72 76.95

Tahunan169 17.1 PENGAWASAN TEKNIK JALAN DAN

JEMBATAN REGULER VIII1 DOK NF K 2,056,230 2,056,230 2,056,230 0 1,060,327 51.57 76.88

Tahunan170 18.00 PENGAWASAN TEKNIK PELABARAN

JALAN BTS. KAB. PACITAN - JARAKAN (TRENGGALEK)

1(1) DOK NF K 1,400,000 1,400,000 3,183,477 0 603,900 43.14 67.11MYC Lanjut

an171 18.1 PENGAWASAN TEKNIK PELABARAN

JALAN BTS. KAB. PACITAN - JARAKAN (TRENGGALEK)

1 DOK NF K 1,400,000 1,400,000 3,183,477 0 603,900 43.14 67.11

MYC Lanjutan

172 19.00 PENGAWASAN TEKNIK PEMBANGUNAN JEMBATAN DAMAS

1(1) DOK NF K 1,050,000 1,050,000 1,580,447 0 545,988 52 72.76MYC Lanjut

an173 19.1 PENGAWASAN TEKNIK PEMBANGUNAN

JEMBATAN DAMAS1 DOK NF K 1,050,000 1,050,000 1,580,447 0 545,988 52 72.76

MYC Lanjutan

174 20.00 PENGAWASAN FLY OVER PASAR KEMBANG

1(1) DOK NF K 1,000,000 1,000,000 2,476,906 0 0 0 0MYC Lanjut

an175 20.1 PENGAWASAN FLY OVER PASAR

KEMBANG1 DOK NF K 1,000,000 1,000,000 2,476,906 0 0 0 0

MYC Lanjutan

176 21.00 PENGAWASAN PBC PENINGKATAN STRUKTUR JALAN BOJONEGORO -PADANGAN

1(1) DOK NF K 1,200,000 1,200,000 2,948,000 0 518,403 43.2 64.65MYC Lanjut

an177 21.1 PENGAWASAN PBC PENINGKATAN

STRUKTUR JALAN BOJONEGORO1 DOK NF K 1,200,000 1,200,000 2,948,000 0 518,402 43.2 64.65

80

STRUKTUR JALAN BOJONEGORO -PADANGAN

MYC Lanjutan

179 22.1 PENGAWASAN PBC PENINGKATAN STRUKTUR JALAN PADANGAN - NGAWI

1 DOK NF K 1,200,000 1,200,000 2,741,174 0 0 0 65.11

MYC Lanjutan

180 23.00

PENGAWASAN TEKNIK JALAN DAN JEMBATAN REGULER IX

1(1) DOK NF K 2,244,430 2,244,430 2,244,430 0 1,293,522 57.63 76.59Tahunan

181 23.1 PENGAWASAN TEKNIK JALAN DAN JEMBATAN REGULER IX

1 DOK NF K 2,238,060 2,238,060 2,238,060 0 1,287,152 57.51 76.52

Tahunan182 24.0

0PENGAWASAN TEKNIK JALAN DAN JEMBATAN REGULER X

1(1) DOK NF K 1,193,105 1,193,105 1,193,105 0 650,120 54.49 67.4Tahunan

183 24.1 PENGAWASAN TEKNIK JALAN DAN JEMBATAN REGULER X

1 DOK NF K 1,186,735 1,186,735 1,186,735 0 643,750 54.25 67.22

Tahunan184 26.0

0PENGAWASAN TEKNIK JALAN DAN JEMBATAN REGULER XI

1(1) DOK NF K 2,070,685 2,070,685 2,070,685 0 805,659 38.91 74.74Tahunan

185 26.1 PENGAWASAN TEKNIK JALAN DAN 1 DOK NF K 2,064,315 2,064,315 2,064,315 0 799,289 38.72 74.66JEMBATAN REGULER XI

Tahunan186 27.0

0PENGAWASAN TEKNIK JALAN DAN JEMBATAN REGULER XII

1(1) DOK NF K 2,162,114 2,162,114 2,162,114 0 1,097,872 50.78 73.09Tahunan

187 27.1 PENGAWASAN TEKNIK JALAN DAN JEMBATAN REGULER XII

1 DOK NF K 2,155,744 2,155,744 2,155,744 0 1,091,502 50.63 73.01

Tahunan188 28.0

0PENGAWASAN TEKNIK JALAN DAN JEMBATAN REGULER XIII

1(1) DOK NF K 1,565,455 1,565,455 1,565,455 0 872,939 55.76 73.22Tahunan

189 28 1 PENGAWASAN TEKNIK JALAN DAN 1 DOK NF K 1 559 085 1 559 085 1 559 085 0 866 569 55 58 73 11189 28.1 PENGAWASAN TEKNIK JALAN DAN JEMBATAN REGULER XIII

1 DOK NF K 1,559,085 1,559,085 1,559,085 0 866,569 55.58 73.11

Tahunan190 29.0

0PENGAWASAN TEKNIK PELEBARAN BULU (BTS. PROV. JATENG) - BTS. KOTA TUBAN

1(1) DOK NF K 1,500,000 1,500,000 3,416,823 0 827,187 55.15 70.87MYC Lanjut

an191 29.1 PENGAWASAN TEKNIK PELEBARAN BULU

(BTS. PROV. JATENG) - BTS. KOTA TUBAN1 DOK NF K 1,500,000 1,500,000 3,416,823 0 827,187 55.15 70.87

MYC Lanjutanan

192 30.00

PENGAWASAN/SUPERVISI JEMBATAN FO PETERONGAN

1(1) DOK NF K 1,610,000 1,610,000 4,018,845 0 691,361 42.94 71.34MYC Lanjut

an193 30.1 PENGAWASAN/SUPERVISI JEMBATAN FO

PETERONGAN1 DOK NF K 1,610,000 1,610,000 4,018,845 0 691,361 42.94 71.34

MYC Lanjutan

194 31.00

Persiapan dan Pemutakhiran Data Dasar 12 BULAN AU AU 32,400 32,400 32,400 0 7,000 21.6 68.59

81

0195 32.0

0Pencatatan dan Pemutakhiran Data Pelaksanaan 28(28) LAP AU AU 3,344 3,344 3,344 0 0 0 69.11

196 33.00

Penyusunan dan Pencetakan Laporan 12 BULAN AU AU 8,083 8,083 8,083 0 0 0 69.22

197 34.00

LAYANAN PERKANTORAN INDUK / PPK WILAYAH

12(12) BULAN AU AU 1,599,620 1,599,620 1,599,620 0 683,707 42.74 64.22

198 35.00

LAYANAN PERKANTORAN PPK METRO SURABAYA

12(12) BULAN AU AU 297,836 297,836 297,836 0 171,348 57.53 64.55

199 36.00 SURVEY PROTEKSI KATODIK DAN COATING TIANG PANCANG SURAMADU SISI MADURA 1

1(1) DOK NF K 50,000 50,000 50,000 0 49,225 98.45 100Tahunan

200 36.1 SURVEY PROTEKSI KATODIK DAN COATING TIANG PANCANG SURAMADU SISI MADURA 1

1 DOK NF K 50,000 50,000 50,000 0 49,225 98.45 100

T hTahunan201 37.00 SURVEY PROTEKSI KATODIK DAN

COATING TIANG PANCANG SURAMADU SISI MADURA 2

1(1) DOK NF K 50,000 50,000 50,000 0 48,895 97.79 100Tahunan

202 37.1 SURVEY PROTEKSI KATODIK DAN COATING TIANG PANCANG SURAMADU SISI MADURA 2

1 DOK NF K 50,000 50,000 50,000 0 48,895 97.79 100

Tahunan203 38.00 SURVEY PROTEKSI KATODIK DAN

COATING TIANG PANCANG1(1) DOK NF K 50,000 50,000 50,000 0 48,950 97.9 100

TahunanCOATING TIANG PANCANG SURAMADU SISI MADURA 3

Tahunan

204 38.1 SURVEY PROTEKSI KATODIK DAN COATING TIANG PANCANG SURAMADU SISI MADURA 3

1 DOK NF K 50,000 50,000 50,000 0 48,950 97.9 100

Tahunan205 39.00 SURVEY PROTEKSI KATODIK DAN

COATING TIANG PANCANG SURAMADU SISI SURABAYA 1

1(1) DOK NF K 50,000 50,000 50,000 0 49,500 99 100Tahunan

206 39 1 SURVEY PROTEKSI KATODIK DAN 1 DOK NF K 50 000 50 000 50 000 0 49 500 99 100206 39.1 SURVEY PROTEKSI KATODIK DAN COATING TIANG PANCANG SURAMADU SISI SURABAYA 1

1 DOK NF K 50,000 50,000 50,000 0 49,500 99 100

Tahunan207 40.00 SURVEY PROTEKSI KATODIK DAN

COATING TIANG PANCANG SURAMADU SISI SURABAYA 2

1(1) DOK NF K 50,000 50,000 50,000 0 49,280 98.56 100Tahunan

208 40.1 SURVEY PROTEKSI KATODIK DAN COATING TIANG PANCANG SURAMADU SISI SURABAYA 2

1 DOK NF K 50,000 50,000 50,000 0 49,280 98.56 100

SURAMADU SISI SURABAYA 2Tahunan

209 51.00 CORE TEAM (P.1) 1(1) DOK NF K 0 0 3,248,000 0 0 0 0Tahunan

210 51.1 CORE TEAM (P.1) 1 DOK NF K 0 0 3,248,000 0 0 0 0Tahunan

211 52.00 PENGAWASAN TEKNIS PEMBANGUNAN JALAN PLOSO-PACITAN (JALAN LINGKAR PACITAN), CS (P.2)

1(1) DOK NF K 0 0 3,437,000 0 0 0 0Tahunan

82

) ( )212 52.1 PENGAWASAN TEKNIS

PEMBANGUNAN JALAN PLOSO-PACITAN (JALAN LINGKAR PACITAN), CS (P.2)

1 DOK NF K 0 0 3,437,000 0 0 0 0

Tahunan213 53.00 PENGAWASAN TEKNIS

PEMBANGUNAN JALAN AKSES PELABUHAN NGGELON, CS (P.3)

1(1) DOK NF K 0 0 3,903,000 0 0 0 0Tahunan

214 53.1 PENGAWASAN TEKNIS PEMBANGUNAN JALAN AKSES PELABUHAN NGGELON, CS (P.3)

1 DOK NF K 0 0 3,903,000 0 0 0 0

Tahunan215 54.00 PENGAWASAN TEKNIS

PEMBANGUNAN JALAS BATAS KOTA1(1) DOK NF K 0 0 1,234,000 0 0 0 0

TahunanPEMBANGUNAN JALAS BATAS KOTA PACITAN-AJOSARI, CS (P.4)

Tahunan

216 54.1 PENGAWASAN TEKNIS PEMBANGUNAN JALAS BATAS KOTA PACITAN-AJOSARI, CS (P.4)

1 DOK NF K 0 0 1,234,000 0 0 0 0

Tahunan217 55.00 PENGAWASAN TEKNIS

PENINGKATAN JALAN WARENG-MUKUS CS (P 5)

1(1) DOK NF K 0 0 1,234,000 0 0 0 0Tahunan

MUKUS, CS (P.5)218 55.1 PENGAWASAN TEKNIS

PENINGKATAN JALAN WARENG-MUKUS, CS (P.5)

1 DOK NF K 0 0 1,234,000 0 0 0 0

Tahunan219 56.00 PENGAWASAN TEKNIS

PENINGKATAN JALAN BATAS KOTA PACITAN-BATAS KABUPATEN TRENGGALEK CS (P 6)

1(1) DOK NF K 0 0 1,494,000 0 0 0 0Tahunan

TRENGGALEK, CS (P.6)220 56.1 PENGAWASAN TEKNIS

PENINGKATAN JALAN BATAS KOTA PACITAN-BATAS KABUPATEN TRENGGALEK, CS (P.6)

1 DOK NF K 0 0 1,494,000 0 0 0 0

Tahunan221 0447211

2PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI SUMATERA SELATANSUMATERA SELATAN

222 25.00 Paket 10 : Pengawasan Teknik Jalan 1(1) DOK NF K 1,723,963 1,723,963 1,723,963 1,723,963 1,043,149 60.51 62.9Tahunan

223 26.00 Paket 11 : Pengawasan Teknik Jalan dan Jembatan

1(1) DOK NF K 1,578,564 1,578,564 1,578,564 1,578,564 889,812 56.37 59.96Tahunan

224 33.00 Paket 17 : Pengawasan Teknis Jalan 1(1) DOK NF K 1,831,798 1,831,798 1,831,798 1,831,798 1,240,523 67.72 69.9Tahunan

225 34.00 Paket 18 : Pengawasan Teknis Jembatan

1(1) DOK NF K 397,355 397,355 397,355 397,355 284,137 71.51 71.64Tahunan

83

Jembatan Tahunan226 0447498

1PELAKSANAAN JALAN NASIONAL WILAYAH II PROPINSI JAWA TENGAH

227 17.00 BERKALA JALAN BAWEN -PRINGSURAT Cs

8(8) KM AU AU 14,210,390 14,210,390 14,210,390 14,210,390 2,851,682 20.07 89.63

228 26.00 PNKT. STRUKTUR JALAN BTS. KOTA REMBANG - BULU (BATAS PROV. JATIM) 1

2.7(2.7) KM AU AU 8,689,830 8,689,830 8,689,830 8,689,830 7,289,892 83.89 99.77

229 27.00 PNKT. STRUKTUR JALAN BTS. KOTA REMBANG - BULU (BATAS PROV. JATIM) 2

1.6(1.6) KM AU AU 4,845,421 4,845,421 4,845,421 4,845,421 4,386,940 90.54 99.65

230 28.00 PNKT. STRUKTUR JALAN BAWEN - 2.5(2.5) KM AU AU 5,872,824 5,872,824 5,872,824 5,872,824 5,506,111 93.76 99.66PRINGSURAT

( )

231 29.00 PNKT. STRUKTUR JALAN MUNTILAN - SALAM (BTS. PROV. D.I. YOGYAKARTA)

2(2) KM AU AU 9,372,846 9,372,846 9,372,846 9,372,846 6,007,930 64.1 94.43

232 48.00 PELEBARAN JALAN BTS. KOTA PATI - BTS. KOTA REMBANG

2.05(2.05) KM AU AU 17,824,008 17,824,008 17,824,008 17,824,008 7,595,611 42.61 43.79

233 50.00 PELEBARAN JALAN PRINGSURAT-BAWEN

2.6(2.6) KM AU AU 13,991,188 13,991,188 13,991,188 13,991,188 7,339,163 52.46 47.51

234 51.00 PELEBARAN JALAN SECANG - 2.7(2.7) KM AU AU 14,935,146 14,935,146 14,935,146 14,935,146 6,697,790 44.85 60.82BTS. KOTA MAGELANG

235 04477091 PERENCANAAN DAN PENGAWASAN JALAN NASIONAL ACEH

236 1.00 Survey IRMS 1(1) DOK NF S 715,050 715,050 715,050 0 307,591 43.02 69.96237 2.00 SURVEY BMS 1(1) DOK NF S 387,010 387,010 387,010 0 310,304 80.18 100238 3.00 Perencanaan Teknik (DED) Jalan

Lintas Timur (Paket-20/2013)1(1) DOK NF K 1,251,595 1,251,595 1,251,595 0 1,250,055 99.88 100

Tahunan239 3.1 Perencanaan Teknik (DED) Jalan

Li t Ti (P k t 20/2013)1 DOK NF K 1,241,845 1,241,845 1,241,845 0 1,240,305 99.88 100

Lintas Timur (Paket-20/2013)Tahunan

240 4.00 Perencanaan Teknik (DED) Jalan Lintas Tengah (Paket-21/2013)

1(1) DOK NF K 2,009,220 2,009,220 2,009,220 0 2,009,220 100 99.51Tahunan

241 4.1 Perencanaan Teknik (DED) Jalan Lintas Tengah (Paket-21/2013)

1 DOK NF K 1,999,470 1,999,470 1,999,470 0 1,999,470 100 100

Tahunan242 5.00 Perencanaan Teknik (DED) Jalan

Lintas Barat (Paket-22/2013)1(1) DOK NF K 1,520,325 1,520,325 1,520,325 0 1,520,325 100 99.36

Tahunan243 5 1 Perencanaan Teknik (DED) Jalan 1 DOK NF K 1 510 575 1 510 575 1 510 575 0 1 510 575 100 100243 5.1 Perencanaan Teknik (DED) Jalan

Lintas Barat (Paket-22/2013)1 DOK NF K 1,510,575 1,510,575 1,510,575 0 1,510,575 100 100

Tahunan244 6.00 Perencanaan Teknik (DED)

Jembatan Lintas Timur 1 (Paket-23/2013)

1(1) DOK NF K 1,232,235 1,232,235 1,232,235 0 1,232,235 100 99.21Tahunan

245 6.1 Perencanaan Teknik (DED) Jembatan Lintas Timur 1 (Paket-23/2013)

1 DOK NF K 1,222,485 1,222,485 1,222,485 0 1,222,485 100 100

Tahunan

84

Tahunan246 8.00 Perencanaan Teknik (DED)

Jembatan Lintas Tengah 1 (Paket-25/2013)

1(1) DOK NF K 1,369,268 1,369,268 1,369,268 0 1,369,268 100 99.29Tahunan

247 8.1 Perencanaan Teknik (DED) Jembatan Lintas Tengah 1 (Paket-25/2013)

1 DOK NF K 1,359,518 1,359,518 1,359,518 0 1,359,518 100 100

Tahunan

248 9.00 Perencanaan Teknik (DED) Jembatan Lintas Tengah 2 (Paket-26/2013)

1(1) DOK NF K 1,425,252 1,425,252 1,425,252 0 1,425,252 100 99.32Tahunan

249 9.1 Perencanaan Teknik (DED) Jembatan Lintas Tengah 2 (Paket-26/2013)

1 DOK NF K 1,415,502 1,415,502 1,415,502 0 1,415,502 100 100

Tahunan250 10.00 Perencanaan Teknik (DED) Jembatan

Lintas Barat (Paket-27/2013)1(1) DOK NF K 1,650,070 1,650,070 1,650,070 0 1,650,070 100 99.41

Tahunan251 10.1 Perencanaan Teknik (DED) Jembatan

Lintas Barat (Paket-27/2013)1 DOK NF K 1,640,320 1,640,320 1,640,320 0 1,640,320 100 100

Tahunan252 11.00 Perencanaan Teknik (DED) Flay Over Jalan

Kota Banda Aceh (Paket-28/2013)1(1) DOK NF K 1,189,363 1,189,363 1,189,363 0 953,440 80.16 99.63

Tahunan253 11.1 Perencanaan Teknik (DED) Flay Over Jalan

Kota Banda Aceh (Paket-28/2013)1 DOK NF K 1,179,613 1,179,613 1,179,613 0 943,690 80 100

Tahunan254 12.00 Perencanaan Teknik (DED) dan Jantho-

Keumala (Paket-29/2013)1(1) DOK NF K 1,258,883 1,258,883 1,258,883 0 1,144,287 90.9 88.01

Tahunan255 12.1 Perencanaan Teknik (DED) dan Jantho-

Keumala (Paket-29/2013)1 DOK NF K 1,249,133 1,249,133 1,249,133 0 1,134,537 90.83 88.7

Tahunan256 13.00 Perencanaan Teknik Jalan Geumpang-

Pameu (Paket 30/2013)1(1) DOK NF K 1,031,650 1,031,650 1,031,650 0 538,872 52.23 87.41

Tahunan257 13.1 Perencanaan Teknik Jalan Geumpang- 1 DOK NF K 1,021,900 1,021,900 1,021,900 0 529,122 51.78 88.25

Pameu (Paket 30/2013)Tahunan

258 14.00 Perencanaan Teknik (DED) Jembatan Strategis Nasional (Paket-31/2013)

1(1) DOK NF K 935,260 935,260 935,260 0 929,210 99.35 99.1Tahunan

259 14.1 Perencanaan Teknik (DED) Jembatan Strategis Nasional (Paket-31/2013)

1 DOK NF K 926,860 926,860 926,860 0 920,810 99.35 100

Tahunan260 16.00 Pengawasan Teknik Jalan Lintas Tengah

(Paket 29/2012)1(1) DOK NF K 1,495,736 1,495,736 3,723,549 0 633,930 42.38 65.9

MYC Lanjutanan

261 16.1 Pengawasan Teknik Jalan Lintas Tengah (Paket 29/2012)

1 DOK NF K 1,495,736 1,495,736 3,723,549 0 266,696 17.83 65.9

MYC Lanjutan

262 17.00 Pengawasan Teknik Jalan Lintas Barat (Paket - 30/2012)

1(1) DOK NF K 2,879,074 2,879,074 6,768,166 0 2,224,265 77.26 65.7MYC Lanjut

an263 17.1 Pengawasan Teknik Jalan Lintas Barat

(Paket 30/2012)1 DOK NF K 2,879,074 2,879,074 6,768,166 0 1,084,604 37.67 65.7

85

(Paket - 30/2012)MYC Lanjut

an

263 17.1 Pengawasan Teknik Jalan Lintas Barat (Paket - 30/2012)

1 DOK NF K 2,879,074 2,879,074 6,768,166 0 1,084,604 37.67 65.7

MYC Lanjutan

264 18.00 Pengawasan Teknik Jalan Lintas Tengah dan Strategis (Paket-01/2013)

1(1) DOK NF K 2,198,892 2,198,892 2,198,892 0 1,544,379 70.23 73.62Tahunan

265 18.1 Pengawasan Teknik Jalan Lintas Tengah dan 1 DOK NF K 2,189,142 2,189,142 2,189,142 0 1,534,629 70.1 73.5g gStrategis (Paket-01/2013)

Tahunan266 19.00 Pengawasan Teknik Jalan Non Lintas (Paket-

02/2013)1(1) DOK NF K 800,560 800,560 800,560 0 471,965 58.95 63.22

Tahunan267 19.1 Pengawasan Teknik Jalan Non Lintas (Paket-

02/2013)1 DOK NF K 792,160 792,160 792,160 0 463,565 58.52 63.89

Tahunan268 20.00 Pengawasan Teknik Jalan Lintas Timur 1

(Paket-03/2013)1(1) DOK NF K 1,722,833 1,722,833 1,722,833 0 1,183,483 68.69 72.09

Tahunan269 20.1 Pengawasan Teknik Jalan Lintas Timur 1

(Paket-03/2013)1 DOK NF K 1,713,083 1,713,083 1,713,083 0 1,173,733 68.52 71.93

Tahunan270 21.00 Pengawasan Teknik Jalan Lintas Timur 2

(Paket-04/2013)1(1) DOK NF K 1,602,427 1,602,427 1,602,427 0 1,012,031 63.16 67.78

Tahunan271 21.1 Pengawasan Teknik Jalan Lintas Timur 2

(Paket-04/2013)1 DOK NF K 1,592,677 1,592,677 1,592,677 0 1,002,281 62.93 68.2

Tahunan272 22.00 Pengawasan Teknik Jalan Lintas Timur 3

(P k t 05/2013)1(1) DOK NF K 1,657,817 1,657,817 1,657,817 0 1,084,445 65.41 69.5

T h(Paket-05/2013) Tahunan273 22.1 Pengawasan Teknik Jalan Lintas Timur 3

(Paket-05/2013)1 DOK NF K 1,648,067 1,648,067 1,648,067 0 1,074,695 65.21 69.91

Tahunan274 23.00 Pengawasan Teknik Jalan dan Jembatan

Lintas Timur 1 Pakaet-06/2013)1(1) DOK NF K 1,606,737 1,606,737 1,606,737 0 894,270 55.66 80.34

Tahunan275 23.1 Pengawasan Teknik Jalan dan Jembatan

Lintas Timur 1 Pakaet-06/2013)1 DOK NF K 1,596,987 1,596,987 1,596,987 0 884,520 55.39 80.83

Tahunan276 24 00 Pengawasan Teknik Jembatan Nasional 1 1(1) DOK NF K 3 663 056 3 663 056 3 663 056 0 2 399 992 65 52 72 18276 24.00 Pengawasan Teknik Jembatan Nasional 1

(Paket-07/2013)1(1) DOK NF K 3,663,056 3,663,056 3,663,056 0 2,399,992 65.52 72.18

Tahunan277 24.1 Pengawasan Teknik Jembatan Nasional 1

(Paket-07/2013)1 DOK NF K 3,651,956 3,651,956 3,651,956 0 2,388,892 65.41 72.4

Tahunan278 25.00 Pengawasan Teknik Jembatan Nasional 2

(Paket-08/2013)1(1) DOK NF K 2,321,815 2,321,815 2,375,164 0 1,387,785 59.77 65.6

Tahunan279 25.1 Pengawasan Teknik Jembatan Nasional 2

(Paket-08/2013)1 DOK NF K 2,312,065 2,312,065 2,312,065 0 1,378,035 59.6 65.88

Tahunan

86

Tahunan280 26.00 Pengawasan Teknik Jalan Lintas Tengah 1

(Paket-09/2013)1(1) DOK NF K 1,162,591 1,162,591 1,162,591 0 685,023 58.92 63.15

Tahunan281 26.1 Pengawasan Teknik Jalan Lintas Tengah 1

(Paket-09/2013)1 DOK NF K 1,152,841 1,152,841 1,152,841 0 675,273 58.57 63.68

Tahunan282 27.00 Pengawasan Teknik Jalan Lintas Tengah 2

(Paket-10/2013)1(1) DOK NF K 1,825,755 1,825,755 1,825,755 0 1,086,999 59.54 64.44

Tahunan

REKAPITULASI PELAKSANAAN ANGGARAN PAKET STRATEGIS TA 2013KEMENTERIAN PEKERJAAN UMUMKEMENTERIAN PEKERJAAN UMUM

k i

PagueMonitoring

RealisasiProgres(%)Dokumen (Rp Ribu)

(Rp Ribu) k

Pagu Paket Pagu Dukungani( ib ) ( ib )No Paket Strategis Paket Keu Fis(Rp Ribu) (Rp Ribu)

1APBN‐P (Eks BA 999) 109 173.935.500 346.249.083 800 0.46 0.18

2APBN‐P (Optimalisasi) 276 1.385.741.966 1.332.358.643 207.112.275 14.95 15.96

7Direktif Presiden 743 1.661.812.117 1.863.629.876 724.788.512 43.61 48.16Kawasan Strategis Pariwisata 

8Nasional 85 1.278.873.873 984.718.076 587.936.866 45.97 46.04

9

Masterplan Percepatan dan Perluasan Pengurangan Kemisikinan di Indonesia (MP3KI) 5965 1.659.171.952 1.531.077.982 198.982.075 11.99 8.83

10

Masterplan Percepatan Perluasan Pembangunan Ekonomi Indonesia (MP3EI) 2520

11.964.083.188 5 887 968 181 5 452 339 263 45 57 54 3910(MP3EI) 2520 8 5.887.968.181 5.452.339.263 45.57 54.39

14Pengembangan Kawasan Perbatasan 83 772.049.474 691.575.194 351.541.930 45.53 57.41

16Rehab Pasca Bencana 25 463.879.851 414.762.413 235.206.457 50.7 51.72

18Unit Percepatan Pembangunan Papua dan Papua Barat (UP4B) 685 3.581.436.799 3.168.030.440 2.327.675.295 64.99 73.05

MASALAH TA 2013 KEMENTERIAN PEKERJAAN UMUM 

PAGU

KODE SATMINKAL / KELOMPOK MASALAH  JML PAKET (Rp Ribu)

04 Ditjen Bina Marga 82 2.027.210.611

Analisa Dampak Lingkungan 16 272.865.784

Cuaca Ekstrim 6 328.432.550

Kesiapan Masyarakat 1 19.800.200

Koordinasi dengan Instansi Lain 1 16.187.001

Pelelangan Rp Murni 3 103.500.000

Pengadaan Lahan 2 190.001.000

Penyerapan Keuangan (SPP/SPM/SP2D/MC/WA) 32 40.825.356

Performa Rekanan 4 62.376.252

Revisi DIPA (Pembukaan Bintang/blokir) 2 1 743 960Revisi DIPA (Pembukaan Bintang/blokir) 2 1.743.960

Sumber Daya Manusia 2 287.090.121

Lain‐lain 13 704.388.387