Konsep Scheduling

5
MINE PLAN ADARO - ENGINEERING WORKSHOP 2002 PT PAMAPERSADA NUSANTARA PAMA Halaman 1 dari 9 GEOLOGICAL MODEL Roof & Floor Structure Contour Topographical Data Slope Stability Data (HW, LW, etc) Borehole Relative Density (averages, default) Coal Quality (optional) RESERVES Waste (per Bench) -High wall Area -Low wall Area -Pit Area (IB, OB, UB) Coal Insitu (per Bench, per Seam) Coal Recovery (per Bench, per Seam) Stripping Ratio Top Soil Removal MINE PLAN Longterm & Shortterm Planned Boundary, Coal, Waste Target, SR Geo-technical Data (Slope stability) Spoil Dump (Volume, Top Soil Balance) Infrastructures : Ramp, S.Pond, Pump, etc. Material : RD, Swelling Factor -Stripping Volume & Area -Mining Volume & Area -Waste Dump Volume Area -Top Soil Volume & Area -ROM Pit Stockpile -Infrastructure -Hauling Distance to ROM/ Spoil Dump MINESCAPE (OPTIONAL) -Model : grid & table file -Topo : grid file -Schema, Sheet, grid spec Waste, Coal, Tsoil Removal Pit Service, etc. Equipment Allocation MINE STAR EXPAC Spreadsheet MINE SCHEDULE Yearly, Monthly, Weekly Sequence Pit /Location Shell Name Bench, Strip, Level Stripping Volume Mining Volume Stripping Ratio Equip Required Material (Coal, Waste, Tsoil -Density, Swell factor, etc. Route Roaster -Rainfall & Slippery -Effective W. Hours Equipment Specification -Capacity -Availability -Dimension -Reimpull, etc. EQUIPMENT PRODUCTIVITY Monitoring/ Updating Monitorin g/ Updating Monitorin g/ Updating Mine Plan and Mine Schedule Flow Chart Monitorin g/ Updating Monitorin g/ Updating

description

ok

Transcript of Konsep Scheduling

Page 1: Konsep Scheduling

MINE PLAN ADARO - ENGINEERING WORKSHOP 2002

PT PAMAPERSADA NUSANTARA

PAMA Halaman 1 dari 9

GEOLOGICAL MODEL•Roof & Floor Structure Contour•Topographical Data•Slope Stability Data (HW, LW, etc)•Borehole•Relative Density (averages, default)•Coal Quality (optional)

RESERVES•Waste (per Bench)

-High wall Area-Low wall Area-Pit Area (IB, OB, UB)

Coal Insitu (per Bench, per Seam)Coal Recovery (per Bench, per Seam)Stripping RatioTop Soil Removal

MINE PLAN•Longterm & Shortterm Planned•Boundary, Coal, Waste Target, SR•Geo-technical Data (Slope stability)•Spoil Dump (Volume, Top Soil Balance)•Infrastructures : Ramp, S.Pond, Pump, etc.•Material : RD, Swelling Factor

-Stripping Volume & Area-Mining Volume & Area-Waste Dump Volume Area-Top Soil Volume & Area-ROM Pit Stockpile-Infrastructure-Hauling Distance to ROM/ Spoil Dump

MINESCAPE(OPTIONAL)

-Model : grid & table file-Topo : grid file

-Schema, Sheet, grid spec

Waste, Coal, Tsoil RemovalPit Service, etc.

•Equipment Allocation

MINE STAREXPAC

Spreadsheet

MINE SCHEDULE•Yearly, Monthly, Weekly

•Sequence•Pit /Location•Shell Name•Bench, Strip, Level•Stripping Volume•Mining Volume•Stripping Ratio•Equip Required

•Material (Coal, Waste, Tsoil -Density, Swell factor, etc.•Route•Roaster -Rainfall & Slippery -Effective W. Hours•Equipment Specification -Capacity -Availability -Dimension -Reimpull, etc.

EQUIPMENT PRODUCTIVITY

Monitoring/Updating

Monitoring/Updating

Monitoring/Updating

Mine Plan and Mine Schedule Flow Chart

Monitoring/Updating

Monitoring/Updating

Page 2: Konsep Scheduling

MINE PLAN ADARO - ENGINEERING WORKSHOP 2002

PT PAMAPERSADA NUSANTARA

PAMA Halaman 2 dari 9

Conceptual of Mine Sequence (X-Section)

Tingkatan warna menggambarkan Plan Sequence Bulanan

Tahapan penambangan (sequence) dimulai dari no. 1, 2, 3, dst dengan metoda bench level per 12 m

Setiap no sequence mempunyai nama shell, dengan pola penamaan sebagai berikut PN1HW036B120S09

Dimensi Shell 100 x 200 x 12 m, tergantung kemampuan unit (digging, grade, loading area

Page 3: Konsep Scheduling

MINE PLAN ADARO - ENGINEERING WORKSHOP 2002

PT PAMAPERSADA NUSANTARA

PAMA Halaman 3 dari 9

Conceptual of Mine Sequence (Long Section)

Arah sequence dimulai dari sidewall menuju ke endwall, kemudian secara bertahap sisi endwall akan didalamkan lebih dulu agar seluruh darinase dapat diarahkan ke posisi sump. Konsep pemotongan dan pola sequence dilakukan dengan mempertimbangkan ramp design overall grade 8%, pada setiap jarak 200 m baru dilakukan penekanan level sedalam 12 m.

Overall grade 8% Sump Area

Progress

Page 4: Konsep Scheduling

MINE PLAN ADARO - ENGINEERING WORKSHOP 2002

PT PAMAPERSADA NUSANTARA

PAMA Halaman 4 dari 9

Monthly Schedule (exmp)

MONTH January

PIT SEQ SHELL NAME OB STRIP COAL SRATIO LOCATION OB STRIP COAL SRATIO

2008 LWB084S09 104,660 PN1 Total 947,230 448,260 2.112009 LWB084S10 101,670 PN2 Total 1,063,240 664,670 1.602010 LWB084S11 161,550 PN3 Total 558,110 683,910 0.822011 LWB084S12 25,310 TOTAL 2,568,580 1,796,840 1.432015 LWB072S09 113,4902016 LWB072S10 143,3202021 HW036B060S11 59,5302026 HW036B048S09 116,040 210,590 0.552027 HW036B048S10 101,100 202,760 0.502028 HW036B048S11 20,560 34,910 0.59

947,230 448,260 2.112012 HW036B084S17 46,440 45,780 1.012017 HW036B072S15 151,3102018 HW036B072S16 69,360 1,560 44.462022 HW036B060S14 237,210 115,990 2.052023 HW036B060S15 232,610 24,380 9.542029 HW036B048S13 205,020 237,020 0.862030 HW036B036S13 121,290 239,940 0.51

1,063,240 664,670 1.602013 HW036B084S05 135,070 11,960 11.292014 HW036B084S06 90,780 21,690 4.192019 HW036B072S07 100,950 124,220 0.812020 HW036B072S08 110,060 146,370 0.752024 HW036B060S08 29,890 171,560 0.172025 HW036B060S09 91,360 208,110 0.44

558,110 683,910 0.82

PN3

PN3 Total

PN1

PN1 Total

PN2

PN2 Total

Month : 2002 OB Stripping

Available Days 27.0 Days Coal Exposed

Effective Days 18.0 Days Coal Mined

Effective Working Hrs 378 Hours Coal Hauling

OB Strip Coal Exp. Loader Eff. WHFrom To (Bcm) (Tonnes) Type (Hrs)

2031 2036 HW084B156S08 HW084B132S08 267,860 20,440 13.10 PC 4000 85% 0.20 1350 28,934 77

2046 2046 LWB072S11 LWB072S11 134,390 - - OK 05 80% 0.28 850 17,146 102

2055 2056 HW036B036S09 HW036B036S10 66,800 415,120 0.16 EX 805 85% 0.80 900 19,290 310

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

469,050 435,560 1.08

2001 2007 HW036B120S20 HW036B096S18 355,400 171,480 2.07 PC 3000 85% 1.00 900 19,290 386

2037 2041 HW036B108S20 HW036B084S19 323,840 194,350 1.67 PC 4000 85% 0.80 1350 28,934 308

2044 2045 HW036B072S17 HW036B072S18 302,610 115,000 2.63 EX 805 85% 0.20 900 19,290 77

2048 2049 HW036B060S16 HW036B060S17 375,510 118,190 3.18 OK 05 80% 0.72 850 17,146 261

2051 2054 HW036B048S14 HW036B036S15 573,420 959,080 0.60 OK 08 80% 1.00 850 17,146 363

- - - OK 13 80% 1.00 950 19,164 363

- - - R 905 80% 0.40 500 10,086 145

- - - OK 09 80% 0.49 850 17,146 177

1,930,780 1,558,100 1.24

2042 2043 LWB084S04 HW036B084S04 35,340 4,820 7.33 OK 09 80% 0.41 850 17,146 148

2047 2047 HW036B072S06 HW036B072S06 84,390 168,170 0.50 - -

2050 2050 HW036B060S07 HW036B060S07 5,680 126,360 0.04 - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

125,410 299,350 0.42

General PC 1000 85% 4.23 300 6,300 1599

2,525,240 2,293,010 1.10

2 1

By By Unit OpeningSchedule Setting Inventory Schedule Unit Set Type (Hours)

EX 803 70% 1.00 720 10,584 318

PC 750 85% 0.88 250 3,927 339

R 906 80% 0.04 480 337 15

-

-

-

EX 804 85% 1.00 950 16,958 386

PC 1100 85% 1.00 480 8,568 386

R 903 80% 0.98 480 7,903 356

R 904 80% 0.60 480 4,853 218

-

Sub Total Volume Setting Unit

February

Sub Total Volume Setting Unit

PN1

Location

TOTAL VOLUME SCHEDULE

PN2

PN3

99,054 263,114

Sub Total Volume Schedule

Coal Expose

(Tonnes)

TOTAL VOLUME SETTING UNIT

435,560

Avg. Ton / Eff.

Days

213,905

1,076,442 345,217 1,203,317

Coal Inventory Est. (Tonnes)Prod'ty

(Updat

Setting of PA

320,709

826,875

PN1

Sub Total Volume Schedule

Sub Total Volume Schedule

PN2 1,558,100

271,500

700,000

Volume

Strip Ratio Sequence

From To

Shell - Bench - Strip

125,410

Location

Eff. WHCoal Mined (Tonnes)

Closing Inventory

Sub Total Volume Setting Unit

Req'

320,709

3,005,036

Target Coal Mined (Tonnes)

Sub Total Volume Setting Unit

469,050

1,930,780

Equipment Setting for OB Strip

PA Req' Prod'ty Avg.Bcm /Days

PT. PAMAPERSADA NUSANTARATUTUPAN MINE (PT ADARO INDONESIA)

Input Data

Page 5: Konsep Scheduling

MINE PLAN ADARO - ENGINEERING WORKSHOP 2002

PT PAMAPERSADA NUSANTARA

PAMA Halaman 5 dari 9

Monthly Map Document

RL

24

RL

24RL

36

RL

12

RL 1

44

RL 1

44

RL 132

ST 01ST 02

ST 03ST 04

ST 05

ST 06

ST 07

ST 08

ST 09

ST 10

ST 11

ST 12

ST 13

ST 14

ST 15

ST 16

ST 17

ST 18

ST 19

ST 20

ST 21

ST 22

ST 23

ST 24

ST 25

ST 26

ST 27

ST 28

ST 29

ST 30

ST-00

ST-01

ST-02

ST-03

ST-04ST-05

ST-06

ST-07ST-08

ST-09

ST-10

ST-11

ST-12ST-13

ST-14ST-15

ST-16ST-17 ST-18

ST-19ST-20

ST-21 ST-22 ST-23 ST-24 ST-25

ST-26ST-27

ST-28ST-29

ST-30