Kajian Pembentukan Tragi Di Sistem Kalbar

21
PT PLN (Persero) Disusun dalam rangka Rapat di PLN Pusat Rabu, 26 Februari 2014

description

Pembentukan Tragi di PLN Wilayah Kalimantan Barat Unit APDP Kalbar

Transcript of Kajian Pembentukan Tragi Di Sistem Kalbar

  • Disusun dalam rangkaRapat di PLN PusatRabu, 26 Februari 2014

    BEKERJA, BEKERJA, BEKERJAMcKinsey & CompanyTRACKERUnit of measure|

    AGENDA PEMBAHASAN

    BEKERJA, BEKERJA, BEKERJAMcKinsey & CompanyTRACKERUnit of measure|

    BEKERJA, BEKERJA, BEKERJAMcKinsey & CompanyTRACKERUnit of measure|

    7 S MCKINSEY STRATEGY MANAGEMENT

    BEKERJA, BEKERJA, BEKERJAMcKinsey & CompanyTRACKERUnit of measure|

    GI. KETAPANG2017GI. SANDAI2017GI. K0TA BARU22019GI. SINTANG2016 GI. NANGA PINOH2018GI SANGGAU2016GI. NGABANG2014GI & GITET BENGKAYANG2014KUCHINGGI. SINGKAWANG GI. MEMPAWAHGI. SIANTANGI. PARIT BARUGI. KOTA BARU2015GI. SEI RAYAGI. TAYAN2014 60 km63 km70 km92 km90 km50 km80 kmGI. SEKADAU201660 kmGI. SUKADANA2017GI. PUTUSIBAU 202090 km 90 kmGI MAMBONG (MATANG)GI. PLTU KURA-KURA201355 km100 km200 km150 km42,18 km16,56 km18,03 km20 km8 kmBADAUBATU KAYABIAWAKARUKGI. KUALA KURUNTEBEDUENTIKONG90 km90 kmTransmisi 150 kV EksistingTransmisi 150 kV RencanaGardu Induk 150 kV EksistingGardu Induk 150 kV RencanaPLTU RencanaGardu Induk 275 kV RencanaTransmisi 275 kV RencanaKETERANGAN :Listrik Perbatasan EksistingListrik Perbatasan RencanaPLTMH RencanaPLTU KALBAR 3 2 X 55 MW (2016)PLTU KALBAR 22 X 27,5 MW (2015)PLTU KALBAR 12 X 50 MW (2015)PLTG/MG PEAKER 100MW (2020)PLTU KETAPANG2 X 10 MW (2015)PLTU IPP KETAPANG 2X6 MW (2015)PLTU TAYAN2 X 100 MW (2017)PLTU SANGGAU2 X 7 MW (2013)PLTU SINTANG3 X 7 MW (2014)GI. SAMBAS2014 PLTGB IPP Putussibau8 MW (2015PTC PUTUSIBAU 2 X 3,5 MW (2016))PLTA NANGA PINOH 2X49 MW (2019/2020)PTC NANGAPINOH2 X 3,5 MW (2016)PLTGB Sewa Tayan6 MW (2013)76 km96 kmGI. TUMBANG TITI 2016GI. KENDAWANGAN2019GI. MANIS MATA 202092 kmWILAYAH KERJA DAN RENCANA PENGEMBANGAN SISTEM

    BEKERJA, BEKERJA, BEKERJAMcKinsey & CompanyTRACKERUnit of measure|

    KONDISI SAAT INIKONDISI TAHUN 2014 - 2015PERTUMBUHAN ASSET

    Daya Terpasang333 MWDaya Mampu233 MWBeban Puncak230 MWJumlah Pembangkit115 unitIPP KIT (Swasta)144 MWJumlah Gardu Induk5 UnitJumlah Trafo8 UnitKapasitas Trafo240 MVAPanjang Transmisi330 kmsJumlah Tower478 buah

    Daya Terpasang758 MWDaya Mampu500 MWBeban Puncak380 MWJumlah Pembangkit145 unitIPP KIT (Swasta)414 MWJumlah Gardu Induk11 UnitJumlah Trafo18 UnitKapasitas Trafo720 MVAPanjang Transmisi1.402 kmsJumlah Tower2.264 buah

    BEKERJA, BEKERJA, BEKERJAMcKinsey & CompanyTRACKERUnit of measure|

    PERTUMBUHAN BEBAN PUNCAK SISTEM KALBAR

    BEKERJA, BEKERJA, BEKERJAMcKinsey & CompanyTRACKERUnit of measure|

    PERTUMBUHAN BEBAN PUNCAK MENURUT RUPTL 2012-2021

    BEKERJA, BEKERJA, BEKERJAMcKinsey & CompanyTRACKERUnit of measure|

    BEKERJA, BEKERJA, BEKERJAMcKinsey & CompanyTRACKERUnit of measure|

    STRUKTUR ORGANISASI APDP KALBAR SAAT INI

    BEKERJA, BEKERJA, BEKERJAMcKinsey & CompanyTRACKERUnit of measure|

    LOKASI GARDU INDUK TERSEBAR S/D TAHUN 2015

    BEKERJA, BEKERJA, BEKERJAMcKinsey & CompanyTRACKERUnit of measure|

    TARGET KINERJA PENYALURAN 2013 DAN 2014*tahun 2014 ada penambahan line transmisi sepanjang 290 kms*tahun 2014 ada penambahan 3 unit Trafo di GI Sambas 30MVA, GI Kota Baru 30MVA dan GI SKW 60MVA

    SATUAN20132014Kinerja TransmisiTransmission Line Outage Duration (TLOD) Jam/ 100kms3,453,45Transmission Line Outage Frequency (TLOF)Kali/100kms25,0025,00Kinerja TrafoTrafo Outage Duration (TROD)Jam/unit0,90,9Trafo Outage Frequency (TROF)Kali/unit0,180,18Trafo Availability Factor (TRAF)%99,599,5

    BEKERJA, BEKERJA, BEKERJAMcKinsey & CompanyTRACKERUnit of measure|

    BEKERJA, BEKERJA, BEKERJAMcKinsey & CompanyTRACKERUnit of measure|

    Kepdir No 197.K/010/DIR/2003 tentang Pedoman Pengembangan OrganisasiUnit pada PT PLN (Persero) Pasal 17 sebagai berikut :Rencana pengembangan organisasi Sub Unit Pelaksana Transmisi dan Gardu Induk adalah dengan memperhatikan batasan sebagai berikut :1. Jumlah gardu induk minimum 5 (lima) Gardu Induk (memenuhi)2. Kapasitas Trafo terpasang trafo daya minimum 50 MVA (memenuhi)3. Penyaluran energi tenaga listrik per tahun minimum 20 GWh (memenuhi)4. Panjang Jaringan Tegangan Tinggi (JTT) minimum 30 kms (memenuhi)KEPDIR NO 197.K/010/DIR/2003ENERGI TERSALUR 2013TOTAL DIKIRIM = 1.342 GWhArea Pontianak = 1.094 GWhArea Singkawang = 248 GWhKONDISI TAHUN 2014-2015

    Daya Terpasang758 MWDaya Mampu500 MWBeban Puncak380 MWJumlah Pembangkit145 unitIPP KIT (Swasta)414 MWJumlah Gardu Induk11 UnitJumlah Trafo18 UnitKapasitas Trafo720 MVAPanjang Transmisi1.402 kmsJumlah Tower2.264 buah

    BEKERJA, BEKERJA, BEKERJAMcKinsey & CompanyTRACKERUnit of measure|

    USULAN STRUKTUR ORGANISASI TRAGI(1)(1)(1)(4)(2)(4)(1)(1)(1)(8)*Benchmark AP2B Sulselrabar

    BEKERJA, BEKERJA, BEKERJAMcKinsey & CompanyTRACKERUnit of measure|

    USULAN RE-STRUKTUR ORGANISASI*Benchmark AP2B Sulselrabar

    BEKERJA, BEKERJA, BEKERJAMcKinsey & CompanyTRACKERUnit of measure|

    USULAN RE-STRUKTUR ORGANISASIMANAJER TRAGIPONTIANAKMANAJER TRAGI SINGKAWANGAHLI KINERJAAHLI QUALITY ASSURANCEAHLI MANAJEMEN RESIKO*Benchmark AP2B Sulselrabar

    BEKERJA, BEKERJA, BEKERJAMcKinsey & CompanyTRACKERUnit of measure|

    BENCHMARK TRAGI DI AP2B SISTEM KALTIM(110 MW)(150 MW)(80 MW)(160 MW)

    BEKERJA, BEKERJA, BEKERJAMcKinsey & CompanyTRACKERUnit of measure|

    htpp://amor.pln.co.idStandar uraian jabatan

    BEKERJA, BEKERJA, BEKERJAMcKinsey & CompanyTRACKERUnit of measure|

    KESIMPULAN

    BEKERJA, BEKERJA, BEKERJAMcKinsey & CompanyTRACKERUnit of measure|

    Disampaikan Pada :Saat Kunjungan Gubernur SULAWESI SELATANMakassar, 31 Desember 2008

    *