Transcript of estimasi harga-R1
No. Item Pekerjaan Satuan Jumlah Total
TANGKI1 Tangki 2000 ton bh 1.00 1,480,915,498 1,480,915,498.36 2 Tangki 750 ton bh 4.00 1,123,682,012 4,494,728,049.67
M/E & PIPING3 - Bulking ls 2.00 3,906,250,000 7,812,500,000.00 4 - Bulking ke KD 203 m 200.00
INFRASTRUKTUR & OFFICE6 Rumah Jembatan Timbang ls 1.00 640,908,000 640,908,000.00 7 Office,Laboratorium & Gudang ls 1.00 740,520,000 740,520,000.00 8 Loading & Loading
UTILITY
Boiler 9 Boiler ( Mech Mar Cap 2.2 Ton ) bh 1.00 902,697,650 902,697,650.00
10 Deaerator Tank Cap 10 T ls 1.00 500,000,000 500,000,000.00 11 Fuel Tank Cap 20T
Softener Plan12 Water Softener ls 1.00 750,000,000 750,000,000.00
Water System 13 Water Tank Cap 5 M314 Hydrant System ls 1.00 395,056,967 395,056,967.20
Jembatan Timbang15 Jembatan Timbang ( Avery 60 T ) ls 1.00 830,000,000 830,000,000.00
GRAND TOTAL 18,547,326,165.23
NilaiEstimasi
Total Estimasi
1,036,640,8493,146,309,635
5,468,750,0000
448,635,600518,364,000
0
631,888,355350,000,000
525,000,000
276,539,877
581,000,000
12,983,128,316