EFFECTIVE BUDGETING AND COST CONTROLFOR COAL MINING PROJECT

Presented by, Yulvia Shandra

PERENCANAAN MENYELURUH PERUSAHAAN DILAKSANAKAN MELALUI EMPAT TAHAP

1. PENETAPAN VISI, DAN MISI

2. PENETAPAN SASARAN DAN STRATEGI3. PENYUSUNAN PROGRAM 4. PENYUSUNAN ANGGARAN

EFFECTIVE BUDGETING

BUDGET ATAU ANGGARAN ADALAHSUATU PERENCANAAN OPERATIONAL YANG DISUSUN SECARA;A. SISTEMATIK B. MELIPUTI SELURUH KEGIATAN PERUSAHAAN C. DINYATAKAN DALAM SUATU UNIT (SATUAN) MONETER D. BERLAKU UNTUK JANGKA WAKTU ATAU PERIODE TERTENTU YANG AKAN DATANG

EFFECTIVE BUDGETING

FUNGSI BUDGET1. 2. 3. 4. ALAT UNTUK MENELITI PERKEMBANGAN USAHA HINGGA MENJADI EFISIEN DAN EFECTIVE KERANGKA KERJA STRATEGI BISNIS PENGAWASAN MONITORING DAN MOTIVASI KERJA EVALUASI KINERJA DENGAN PERBANDINGAN DARI TAHUN KE TAHUN

PENYUSUNAN BUDGET1. 2. 3. 4. SISTEMATIS REALISTIS FLEKSIBEL KONTINYU

EFFECTIVE BUDGETING

MASTER BUDGETA. OPERATING BUDGET (ANGGARAN OPERATIONAL) BERKAITAN DENGAN AKTIVITAS UNTUK MENGHASILKAN LABA PERUSAHAAN, PENYUSUNAN AKHIR DARI OPERATING BUDGET ADALAH PROYEKSI LABA RUGI (PROJECTED INCOME STATEMENT) B. FINANCIAL BUDGET (ANGGARAN KEUANGAN) BERKAITAN DENGAN ALIRAN KAS MASUK DAN KAS KELUAR C. CAPITAL BUDGET (ANGGARAN MODAL) BERKAITAN DENGAN TAMBAHAN ATAU PENGURANGAN AKTIVA TETAP PERUSAHAAN, DISUSUN BERDASARKAN PRAKIRAAN PENJUALAN JK PANJANG

COST CONTROL

COST ADALAHSEMUA BIAYA YANG DIKELUARKAN ATAU POTENSIAL DIANGGAP MEMBERI MANFAAT DI MASA AKAN DATANG, DENGAN KLASIFIKASI BERDASARKAN FUNGSI, SEBAGAI BERIKUT;

A. PRODUKSI B. PEMASARAN C. ADMINISTRASI D. KEUANGAN

COAL MINING

KEGIATAN USAHA POKOK DALAM INDUSTRI PERTAMBANGAN UMUMA. EXPLORATION (EKSPLORASI) B. DEVELOPMENT AND CONSTRUCTION (PENGEMBANGAN DAN KONSTRUKSI) C. PRODUCTION (PRODUKSI) D. PENGOLAHAN

HOW TO CONTROL COST WITH EFFECTIVE BUDGETING AT COAL MINING PROJECT?

HOW TO CONTROL COST WITH EFFECTIVE BUDGETING AT COAL MINING PROJECT?MENELUSURI SEMUA BIAYA-BIAYA YANG BERKAITAN DENGAN KEGIATAN INDUSTRI PERTAMBANGAN BESERTA RUANG LINGKUPNYA MENGHITUNG PERKIRAAN PENDAPATAN DAN BIAYA KONTRAK SERTA TAKSIRAN KERUGIAN (EXPECTED LOSS)

ANALISA FAKTOR-FAKTOR YANG MEMPENGARUHI PERKEMBANGAN USAHA DAN PENYUSUNAN RENCANA USAHAMENERAPKAN SISTEM MANAJEMEN BIAYA DAN TEKNOLOGI BARU DALAM PELAKSANAAN PEKERJAAN DAN IMPLEMENTASI ANGGARAN

HOW TO CONTROL COST WITH EFFECTIVE BUDGETING AT COAL MINING PROJECT?

BIAYA BIAYA INDUSTRI PERTAMBANGAN

1. EKSPLORASI A. PENYELIDIKAN UMUM BIAYA STUDI LITERATUR BIAYA PEROLEHAN DATA SATELIT DAN FOTO UDARA BIAYA PEMETAAN GEOLOGI BIAYA PENGAMBILAN CONTOH BIAYA ANALISIS CONTOH PERMUKAAN

HOW TO CONTROL COST WITH EFFECTIVE BUDGETING AT COAL MINING PROJECT?

BIAYA BIAYA INDUSTRI PERTAMBANGAN

1. EKSPLORASI B. PERIZINAN DAN BIAYA ADMINISTRASI BIAYA PEROLEHAN KUASA PERTAMBANGAN BIAYA PEROLEHAN KONTRAK KERJA SAMA BIAYA PEROLEHAN KONTRAK KERJA KARYA BIAYA PEMBEBASAN TANAH/ TANAM TUMBUH

BIAYA ADMINISTRASI EKSPLORASI

HOW TO CONTROL COST WITH EFFECTIVE BUDGETING AT COAL MINING PROJECT?

BIAYA BIAYA INDUSTRI PERTAMBANGAN

1. EKSPLORASI C. GEOLOGI DAN GEOFISIKA BIAYA SIDE LOOKING AIR RADAR (SLAR) BIAYA GEOLOGI LAPANGAN BIAYA GEOLOGI KIMIA, TERMASUK ANALISIS PENGUJIAN LABORATORIUM BIAYA PENYELIDIKAN GRAVITASI BIAYA PENYELIDIKAN MAGNETIK BIAYA PENYELIDIKAN SEISMIK

HOW TO CONTROL COST WITH EFFECTIVE BUDGETING AT COAL MINING PROJECT?

BIAYA BIAYA INDUSTRI PERTAMBANGAN

1. EKSPLORASI D. PEMBORAN EKSPLORASI BIAYA PERSIAPAN LAHAN TERMASUK BIAYA PEMBUATAN JALAN MASUK KE LOKASI PEMBORAN BIAYA PEMBORAN TERMASUK PERALATAN BOR BIAYA MOBILISASI DAN DEMOBILISASI BIAYA PENGUJIAN DAN PERAMPUNGAN BIAYA LOGISTIK SELAMA DILAKSANAKAN PEMBORAN

HOW TO CONTROL COST WITH EFFECTIVE BUDGETING AT COAL MINING PROJECT?

BIAYA BIAYA INDUSTRI PERTAMBANGAN

1. EKSPLORASI E. EVALUASI SEMUA BIAYA YANG BERKAITAN DENGAN KEGIATAN EVALUASI

HOW TO CONTROL COST WITH EFFECTIVE BUDGETING AT COAL MINING PROJECT?

BIAYA BIAYA INDUSTRI PERTAMBANGAN

2. PENGEMBANGAN DAN KONSTRUKSI A. BIAYA PENGEMBANGAN BIAYA ADMINISTRASI BIAYA PENGURUSAN PERIZINAN DAN KUASA PERTAMBANGAN BIAYA PEMBEBASAN TANAH

BIAYA PEMBERSIHAN LAHAN (LAND CLEARING) BIAYA PEMBUKAAN TAMBANG, TERMASUK PENGUPASAN LAPISAN TANAH (SEBELUM PRODUKSI)

HOW TO CONTROL COST WITH EFFECTIVE BUDGETING AT COAL MINING PROJECT?

BIAYA BIAYA INDUSTRI PERTAMBANGAN

2. PENGEMBANGAN DAN KONSTRUKSI B. BIAYA KONSTRUKSI BIAYA PEMBUATAN PRASARANA BIAYA PEMBUATAN ATAU PENGADAAN BANGUNAN BIAYA PEMBUATAN ATAU PENGADAAN MESIN DAN PERALATAN

HOW TO CONTROL COST WITH EFFECTIVE BUDGETING AT COAL MINING PROJECT?

BIAYA BIAYA INDUSTRI PERTAMBANGAN

3. PRODUKSI A. PENGUPASAN LAPISAN TANAH (STRIPPING) SELAMA MASA PRODUKSI BIAYA PENGELUPASAN TANAH BIAYA PENYEDIAAN LAHAN UNTUK PENIMBUNAN TANAH BIAYA PENBIMBUNAN TANAH HASIL PENGUPASAN

HOW TO CONTROL COST WITH EFFECTIVE BUDGETING AT COAL MINING PROJECT?

BIAYA BIAYA INDUSTRI PERTAMBANGAN

3. PRODUKSI B. PENGAMBILAN BAHAN GALIAN BIAYA PENGGALIAN BIAYA PENYEMPROTAN BIAYA PENGERUKAN, ATAU BIAYA PELEDAKAN PENIMBUNAN BAHAN GALIAN

HOW TO CONTROL COST WITH EFFECTIVE BUDGETING AT COAL MINING PROJECT?

BIAYA BIAYA INDUSTRI PERTAMBANGAN

3. PRODUKSIC. PENCUCIAN BAHAN GALIAN BIAYA PEMBERSIHAN DAN PEMISAHAN BAHAN GALIAN UTAMA DARI BAHAN GALIAN IKUTANNYA BIAYA PEMBENTUKAN UKURAN/ BESARNYA BAHAN GALIAN SESUAI DENGAN YANG DITETAPKAN PERUSAHAAN

D. PENGANGKUTAN BAHAN GALIANE. PENGELOLAAN LINGKUNGAN HIDUP

HOW TO CONTROL COST WITH EFFECTIVE BUDGETING AT COAL MINING PROJECT?

BIAYA BIAYA INDUSTRI PERTAMBANGAN

4. PENGELOLAAN LINGKUNGAN HIDUPBIAYA YANG BERKAITAN DENGAN PENGADAAN PRASARANA PLH, BIAYA YANG TIMBUL ATAS USAHA MENGURANGI DAN MENGENDALIKAN DAMPAK NEGATIF KEGIATAN PERTAMBANGAN, DAN BIAYA RUTIN LAINNYA

HOW TO CONTROL COST WITH EFFECTIVE BUDGETING AT COAL MINING PROJECT?MENELUSURI SEMUA BIAYA-BIAYA YANG BERKAITAN DENGAN KEGIATAN INDUSTRI PERTAMBANGAN BESERTA RUANG LINGKUPNYA MENGHITUNG PERKIRAAN PENDAPATAN DAN BIAYA KONTRAK SERTA TAKSIRAN KERUGIAN (EXPECTED LOSS) ANALISA FAKTOR-FAKTOR YANG MEMPENGARUHI PERKEMBANGAN USAHA DAN PENYUSUNAN RENCANA USAHA MENERAPKAN SISTEM MANAJEMEN BIAYA DAN TEKNOLOGI BARU DALAM PELAKSANAAN PEKERJAAN DAN IMPLEMENTASI ANGGARAN

HOW TO CONTROL COST WITH EFFECTIVE BUDGETING AT COAL MINING PROJECT?

PENDAPATAN KONTRAK KONSTRUKSI1. 2. 3. 4. NILAI PENDAPATAN SEMULA YANG DISETUJUI DALAM KONTRAK PENYIMPANGAN DALAM PEKERJAAN KONTRAK, KLAIM, DAN PEMBAYARAN INSENTIF SEPANJANG HAL INI MEMUNGKINKAN UNTUK MENGHASILKAN PENDAPATAN DAPAT DIUKUR SECARA ANDAL

HOW TO CONTROL COST WITH EFFECTIVE BUDGETING AT COAL MINING PROJECT?

BIAYA KONTRAK KONSTRUKSI1. 2. BIAYA YANG BERHUBUNGAN LANGSUNG DENGAN KONTRAK TERTENTU BIAYA YANG DAPAT DIATRIBUSIKAN PADA AKTIVITAS KONTRAK PADA UMUMNYA DAN DAPAT DIALOKASIKAN KE KONTRAK TERSEBUT BIAYA LAIN YANG SECARA KHUSUS DAPAT DITAGIHKAN KE PEMBERI KERJA SESUAI KONTRAK

3.

HOW TO CONTROL COST WITH EFFECTIVE BUDGETING AT COAL MINING PROJECT?

TAKSIRAN RUGI (EXPECTED LOSS)PREDIKSI KEMUNGKINAN TERJADI TOTAL BIAYA KONTRAK AKAN MELEBIHI TOTAL PENDAPATAN KONTRAK

HOW TO CONTROL COST WITH EFFECTIVE BUDGETING AT COAL MINING PROJECT?MENELUSURI SEMUA BIAYA-BIAYA YANG BERKAITAN DENGAN KEGIATAN INDUSTRI PERTAMBANGAN BESERTA RUANG LINGKUPNYA MENGHITUNG PERKIRAAN PENDAPATAN DAN BIAYA KONTRAK SERTA TAKSIRAN KERUGIAN (EXPECTED LOSS) MENGANALISA FAKTOR-FAKTOR YANG MEMPENGARUHI PERKEMBANGAN USAHA DAN PENYUSUNAN RENCANA USAHA MENERAPKAN SISTEM MANAJEMEN BIAYA DAN TEKNOLOGI BARU DALAM PELAKSANAAN PEKERJAAN DAN IMPLEMENTASI ANGGARAN

HOW TO CONTROL COST WITH EFFECTIVE BUDGETING AT COAL MINING PROJECT?

FAKTOR-FAKTOR YANG MEMPENGARUHI PERKEMBANGAN USAHA DAN PENYUSUNAN RENCANA USAHA1. FAKTOR-FAKTOR INTERNAL (CONTROLLABLE)A. PENDAPATAN 2-3 TAHUN TERAKHIR (POSISI PERSAINGAN, DLL)

B.C. D.

BEBIJAKSANAAN PENETAPAN NILAI KONTRAK, PEMILIHAN VENDOR, DAN SEBAGAINYAKAPASITAS KONSTRUKSI TENAGA KERJA, JUMLAH MAUPUN KETERAMPILAN DAN KEAHLIANNYA

E.F. G.

MODAL KERJA/ POSISI KEUANGAN (NERACA, R/L, SHU DAN CASH FLOW)FASILITAS-FASILITAS LAIN YANG DIMILIKI PERUSAHAAN HASIL EVALUASI REALISASI BUDGET TAHUN SEBELUMNYA

HOW TO CONTROL COST WITH EFFECTIVE BUDGETING AT COAL MINING PROJECT?

FAKTOR-FAKTOR YANG MEMPENGARUHI PERKEMBANGAN USAHA DAN PENYUSUNAN RENCANA USAHA 2. FAKTOR-FAKTOR EKSTERNAL (UNCONTROLLABLE)A. B. KEADAAN PERSAINGAN BEBIJAKSANAAN PEMERINTAH, DAN LAINNYA

HOW TO CONTROL COST WITH EFFECTIVE BUDGETING AT COAL MINING PROJECT?MENELUSURI SEMUA BIAYA-BIAYA YANG BERKAITAN DENGAN KEGIATAN INDUSTRI PERTAMBANGAN BESERTA RUANG LINGKUPNYA MENGHITUNG PERKIRAAN PENDAPATAN DAN BIAYA KONTRAK SERTA TAKSIRAN KERUGIAN (EXPECTED LOSS) MENGANALISA FAKTOR-FAKTOR YANG MEMPENGARUHI PERKEMBANGAN USAHA DAN PENYUSUNAN RENCANA USAHA MENERAPKAN SISTEM MANAJEMEN BIAYA DAN TEKNOLOGI BARU DALAM PELAKSANAAN PEKERJAAN DAN IMPLEMENTASI ANGGARAN

HOW TO CONTROL COST WITH EFFECTIVE BUDGETING AT COAL MINING PROJECT?

SISTEM MANAJEMEN BIAYA1. 2. 3. ZERO DEFECT PROGRAM NON VALUE ADDED TIME JUST IN TIME CONCEPT

4.5. 6.

ACTIVITY BASED MANAGEMENT/ ABMLIFE CYCLE COSTING TARGET COSTING

HOW TO CONTROL COST WITH EFFECTIVE BUDGETING AT COAL MINING PROJECT?

SISTEM MANAJEMEN BIAYA 1.

ZERO DEFECT PROGRAMMAINTAIN QUALITY TO DO THE RIGHT AT THE FIRST TIME

2.

NON VALUE ADDED TIMEREDUCE WASTE TIME: MOVE TIME, INSPECTION TIME, WAIT TIME

3.

JUST IN TIME CONCEPTFIXED SCHEDULING

HOW TO CONTROL COST WITH EFFECTIVE BUDGETING AT COAL MINING PROJECT?

S