DOCUMENT TRANSMITTAL To : PT. PETROKIMIA GRESIK No. Doc. : 01.PC.77-NON-2012.LAM.CSP.PKG.XI.2012 Attention : ENGINEERING CONVEYING SYSTEM PROJECT From : PT. LINTANG ANDALAN MAKMUR Up. Bp. MARDADA Project : CONVEYING SYSTEM Date : 29 NOPEMBER 2012 Address : Jl. Jend. Ahmad Yani, Gresik 61119 Prepared by : PROJECT CONTROL Kami kirimkan dokumen - dokumen sebagai berikut: No Document / No DWG Rev Sheet Title/Description Size Media No No Type Copies 1 DELIVERIABLE LIST MECHANICAL & PIPING A4 LIST 1 bendel 2 52-P-11-29-2000-01 0 1 P & ID - BULK MATERIAL DARI GUDANG CURAH 1 3 52-P-11-29-7000-01 0 1 P & ID - BULK MATERIAL DARI TOWER T.22 A3 DWG 1 4 52-P-11-29-7000-02 0 1 P & ID - BULK MATERIAL DARI TOWER T.22 A3 DWG 1 5 52-P-12-29-400-01 0 1 PFD - BULK MATERIAL DARI PONSKA I A3 DWG 1 6 52-P-12-29-500-01 0 1 PFD - BULK MATERIAL DARI PONSKA II & III A3 DWG 1 7 52-P-12-29-2000-01 0 1 PFD - BULK MATERIAL DARI GUDANG CURAH A3 DWG 1 8 52-P-12-29-7000-01 0 1 PFD - BULK MATERIAL DARI TOWER T.22 A3 DWG 1 9 52-P-12-29-7000-02 0 1 PFD - BULK MATERIAL DARI TOWER T.22 A3 DWG 1 Sent to you for : Information Construction Quotation Comment Fabrication Tendering X Review First Issue As-Requested Approval Revision ………………. Comments : Sent by : X Hand Coureir Email Fax Received by, Submitted by, CHOIRUL MASJUDI After being signed and stamped, the original copy of this transmittal shall returned to Lintang Andalan Makmur PT.

description

CCF03252013_0002

Transcript of Dokumen Transmittal-01

Page 1: Dokumen Transmittal-01

DOCUMENT TRANSMITTALTo : PT. PETROKIMIA GRESIK No. Doc. : 01.PC.77-NON-2012.LAM.CSP.PKG.XI.2012Attention : ENGINEERING CONVEYING SYSTEM PROJECT From : PT. LINTANG ANDALAN MAKMUR

Up. Bp. MARDADA Project : CONVEYING SYSTEM

Date : 29 NOPEMBER 2012

Address : Jl. Jend. Ahmad Yani, Gresik 61119 Prepared by : PROJECT CONTROL

Kami kirimkan dokumen - dokumen sebagai berikut:

No Document / No DWGRev

Sheet Title/Description SizeMedia No

No Type Copies

1 DELIVERIABLE LIST MECHANICAL & PIPING A4 LIST 1 bendel

2 52-P-11-29-2000-01 0 1 P & ID - BULK MATERIAL DARI GUDANG CURAH 1

3 52-P-11-29-7000-01 0 1 P & ID - BULK MATERIAL DARI TOWER T.22 A3 DWG 1

4 52-P-11-29-7000-02 0 1 P & ID - BULK MATERIAL DARI TOWER T.22 A3 DWG 1

5 52-P-12-29-400-01 0 1 PFD - BULK MATERIAL DARI PONSKA I A3 DWG 1

6 52-P-12-29-500-01 0 1 PFD - BULK MATERIAL DARI PONSKA II & III A3 DWG 1

7 52-P-12-29-2000-01 0 1 PFD - BULK MATERIAL DARI GUDANG CURAH A3 DWG 1

8 52-P-12-29-7000-01 0 1 PFD - BULK MATERIAL DARI TOWER T.22 A3 DWG 1

9 52-P-12-29-7000-02 0 1 PFD - BULK MATERIAL DARI TOWER T.22 A3 DWG 1

Sent to you for :

Information Construction Quotation

Comment Fabrication Tendering

XReview First Issue As-Requested

Approval Revision ……………….

Comments :

Sent by : X Hand Coureir EmailFax

Received by, Submitted by,

CHOIRUL MASJUDI

After being signed and stamped, the original copy of this transmittal shall returned to Lintang Andalan Makmur PT.