Daftar Isi Fs Pltu Merah Putih

download Daftar Isi Fs Pltu Merah Putih

of 6

Transcript of Daftar Isi Fs Pltu Merah Putih

PRE-FS Mine Mouth CFSPP SUMSEL-6

DAFTAR ISIDRAFT FINAL REPORT

PLTU MERAH PUTIH(PLTU: MAUMERE 2X10 MW, BIAK 2X7 MW, MANOKWARI 2X7 MW)

BAB I IDENTIFIKASI DAN PEMILIHAN LOKASI1.1 PENDAHULUAN1.2 PEMILIHAN LOKASI1.2.1PENILAIAN TERHADAP ALTERNATIF 1.2.2PERBANDINGAN ALTENATIF LOKASI1.3JUSTIFIKASI LOKASI PROYEK1.4KONDISI LOKASI PROYEK (HASIL STUDI LAPANGAN)

1.4.1.KONDISI TOPOGRAPHI

1.4.2.KONDISI BATHIMETRY

1.4.3. KONDISI GEOLOGY(TERMASUK SOIL RESISTIVITY)

1.4.4. KONDISI GEOTEKNIK

1.4.5. KONDISI IKLIM/KLIMATOLOGI

1.4.6.KONDISI KEGEMPAAN

1.4.7. KONDISI MUKA AIR LAUT (PENGUKURAN PASANG SURUT)

1.4.8. KONDISI HYDROOCEANOGRAPHY

1.4.9. KONDISI EKOLOGI DAN EKOSISTEM

1.4.10. KONDISI AKSES JALAN M ASUKBAB 2STUDI SISTEM KELISTRIKAN 2.1 KONDISI SISTEM KELISTRIKAN

2.1.1SISTEM KELISTRIKAN

2.1.2RAMALAN KEBUTUHAN BEBAN2.1.3PEMASOKAN DAYA PEMBANGKIT 2.1.4STUDI NERACA DAYA

2.1.5STUDI SISTIM JARINGAN2.1.6STUDI ALIRAN DAYA

2.1.7STUDI SHORT CIRCUIT

2.2PRAKIRAAN KONDISI KELISTRIKAN MENDATANG2.3STUDI INTERKONEKSI JARINGAN TENAGA LISTRIK DENGAN JARINGAN DISTRIBUSI YANGSUDAH ADABAB 3PERTIMBANGAN SUMBER BAHAN BAKAR BATUBARA

3.1PASOKAN BATUBARA DAN KARAKTERISTIK BATUBARA 3.2PROYEKSI PERMINTAAN NASIONAL UNTUK BATUBARA3.3HARGA BATUBARA INDONESIA

3.4KARAKTERISTIK PERTIMBANGAN PEMASOKAN BATUBARA 3.6

PROYEKSI DARI KETERSEDIAAN PERMINTAAN BATUBARA PADA PEMBANGKIT LISTRIK 3.7PERATURAN PASAR BATUBARA UNTUK INDONESIA 3.8TRANSPORTASI BATUBARA

3.9KONSUMSI BATUBARA UNTUK PEMBANGKIT LISTRIK

BAB 4DISAIN PEMBANGKIT LISTRIK4.1TATA LETAK

4.2DESKRIPSI SISTEM UTAMA

4.2.1SISTEM MEKANIKAL DAN PERALATANNYA

4.2.1.1STEAM GENERATOR DAN PERALATAN PENUNJANGNYA4.2.1.2TURBIN UAP DAN PERALATAN PENDUKUNGNYA4.2.1.3SISTEM AIR PENDINGIN PEMBANGKIT4.2.1.4SISTEM AIR PENGISI BOILER4.2.1.5SISTEM AIR BERSIH 4.2.1.6BALANCE OF PLANT (BOP)4.2.1.7SISTEM BAHAN BAKAR BATU BARA (COAL YARD, COAL SHED DAN COAL HANDLING SYSTEM)4.2.1.8 SISTEM BUANGAN ABU BATU BARA (COAL ASH HANDLING)4.2.1.9 SISTEM BUANGAN AIR KOTOR(WASTE WATER SYSTEM)4.2.2SISTEM LISTRIK DAN PERALATANNYA

4.2.2.1

SUMBER TENAGA LISTRIK MASA KONSTRUKSI4.2.2.2

SISTEM LISTIK PEMBANGKIT4.2.2.3SISTEM KELUARAN UTAMA4.2.2.4SISTEM TRAFO

4.2.2.5 SISTIM SWITCHYARD & GARDU DISTRIBUSI 20 KV

4.2.3INSTRUMENTASI DAN SISTEM KONTROL

4.2.3.1SISTIM PENTANAHAN4.2.3.2SISTEM KONTROL PEMBANGKIT4.2.3.3SISTIM PENERANGAN DAN KOMUNIKASI4.2.3.4SISTIM PROTEKSI4.2.3.5SISTEM PENGENDALIAN DAYA (SUBSTATION) 4.3DISAIN SIPIL

4.3.1STRUKTUR PENGAMBILAN AIR (WATER INTAKE STRUCTURE)4.3.2STRUKTUR PEMBUANGAN AIR (WATER DISCHARGE STRUCTURE)4.3.3DISAIN STRUKTUR PENANGANAN BATU BARA4.3.4DISAIN STRUTUR PONDASI4.3.5DISAIN STRUKTUR DAN BANGUNAN4.3.5.1DISAIN BETON BERTULANG4.3.5.2DISAIN STRUKTURAL BAJA 4.3.5.3DISAIN STRUKTUR HIDRO4.3.5.4DISAIN PONDASI TIANG PANCANG4.3.6DESKRIPSI STRUKTURAL GEDUNG UTAMA

4.3.6.1GEDUNG PEMBANGKIT (MAIN POWER HOUSE)4.3.6.2STUKTUR BOILER 4.3.7DISAIN STRUKTUR DAN BANGUNAN SIPIL4.3.7.1STRUKTUR CEROBONG ASAP(CHIMNEY STRUCTURE)4.3.7.2PONDASI TRANSFORMER DAN STRUKTUR SERANDANG HUBUNG

4.3.7.3BANGUNAN

4.3.7.4DISAIN PELABUHAN BATU BARA

4.3.8SIPIL PRASARANA

4.3.8.1 PERSIAPAN LAPANGAN (SITE LEVELLING)

4.3.8.2 DISAIN JALAN DAN DRAINASE

BAB 5STUDI PELAKSANAAN PROYEK

5.1 KONSTRUKSI KONTRAK EPC5.2 OPERASIONAL PROYEK

5.3 ANALISIS PERKIRAAN BIAYA PROYEK5.4 ANALISIS JADWAL PELAKSANAAN PROYEK5.5 KEY MILESTONE

BAB 6ANALISA FINANSIAL DAN KEUANGAN6.1STRUKTUR BIAYA6.1.1BIAYA PENGEMBANGAN

6.1.2BIAYA ENGINEERING PROCUREMENT AND CONSTRUCTION (EPC)6.1.3BIAYA BAHAN BAKAR (BATUBARA)6.1.4BIAYA OPERASI & PEMELIHARAAN (O & M) 6.1.5IMPOR DAN BEBAS PAJAK

6.1.6 BIAYA PENDANAAN6.1.7TOTAL BIAYA PROYEK6.2STRUKTUR PEMBIAYAAN6.2.1PEMBIAYAAN EKUITAS6.2.2PEMBIAYAAN UTANG6.3.SKEMA PROYEK6.3.1PENGANTAR

6.3.2PERJANJIAN PEMBELIAN TENAGA LISTRIK6.3.3KONTRAKOPERASIDANPEMELIHARAAN

6.3.4ASPEK KOMERSIAL6.3.8ASPEK HUKUM6.3.9PILIHAN PROSES SELEKSI MITRA

6.5STRUKTUR TARIF LISTRIK6.6ANALISA SENSITIVITASBAB 7ANALISA PROYEK7.1 ANALISA RESIKO7.2 MITIGASI RESIKOBAB 8

ASPEK AMDAL8.1DASAR HUKUM AMDAL

8.1.1DASAR HUKUM PROSEDUR AMDAL

8.1.2DASAR HUKUM STANDAR LINGKUNGAN

8.2PROSEDUR AMDALDAFTAR LAMPIRAN1. LAMPIRAN LAPORAN HASIL PENYELIDIKAN TANAH

2. LAMPIRAN LAPORAN HASIL SURVEY TOPOGRAPHY

3. LAMPIRAN LAPORAN HASIL SURVEY BATHYMETRYDAFTAR TABEL

DAFTAR GAMBAR