Analis Cipta Karya 2012-8 FEB 2012

313
D A F T A R U P A H P E K E R J A T A H U N S U M B E R D A T A : P A S A R D A E R A H : KABUPATEN Edisi Des NO. J E N I S B A H A N SAT 1 2 3 1 P e k e r j a Hr 2 M a n d o r Hr 3 T u k a n g l i s t r i k Hr 4 T u k a n g k a y u Hr 5 K e p . t k . k a y u Hr 6 T u k a n g b a t u Hr 7 K e p . t k . b a t u Hr 8 T u k a n g b e s i Hr 9 K e p . t k . b e s i Hr 10 T u k a n g c a t Hr 11 K e p . t k . c a t Hr 12 T u k a n g p l i t u r Hr 13 T u k a n g j a l a n Hr 14 T u k a n g g a l i Hr

Transcript of Analis Cipta Karya 2012-8 FEB 2012

Page 1: Analis Cipta Karya 2012-8 FEB 2012

D A F T A R U P A H P E K E R J A T A H U N 2 0 1 1

S U M B E R D A T A : P A S A R A N B E B A S D A E R A H : KABUPATEN MIMIKA

Edisi Desember 2012

NO. J E N I S B A H A N SAT HARGA

1 2 3 4

1 P e k e r j a Hr 100,000.00

2 M a n d o r Hr 150,000.00

3 T u k a n g l i s t r i k Hr 110,000.00

4 T u k a n g k a y u Hr 110,000.00

5 K e p . t k . k a y u Hr 150,000.00

6 T u k a n g b a t u Hr 110,000.00

7 K e p . t k . b a t u Hr 150,000.00

8 T u k a n g b e s i Hr 110,000.00

9 K e p . t k . b e s i Hr 150,000.00

10 T u k a n g c a t Hr 110,000.00

11 K e p . t k . c a t Hr 150,000.00

12 T u k a n g p l i t u r Hr 110,000.00

13 T u k a n g j a l a n Hr 110,000.00

14 T u k a n g g a l i Hr 110,000.00

Page 2: Analis Cipta Karya 2012-8 FEB 2012

2

305004875045000

48750

10.84990958409

27650

9493.75

Page 3: Analis Cipta Karya 2012-8 FEB 2012

Page 3 Daftar Harga Bahan 2012

D A F T A R H A R G A S A T U A N B A H A N B A N G U N A N

S U M B E R D A T A : P A S A R A N B E B A S

D A E R A H : KABUPATEN MIMIKA

Edisi Desember 2012

NO. J E N I S B A H A N sat Harga Satuan (Rp)

1 2 3 4

I B A H A N D A S A R 1 BATU BELAH Batu Kali 600,000.00

Batu Belah Bulat Putih 15/20 m3 625,000.00 Batu Belah Bulat Putih 5/7 m3 650,000.00 Batu Belah Batu Belah Hitam 15/20 m3 675,000.00 Batu Belah Batu Belah Hitam 5/7 m3 700,000.00 Batu Belah Batu Belah Hitam 3/5 m3 725,000.00

2 KERIKIL Batu Pecah 2/3 m3 1,000,000.00 Batu Pecah 1/2 m3 1,025,000.00 Batu Pecah 0,5/1 m3 1,050,000.00 Srtu Timbunan m3 225,000.00 Koral m3 350,000.00 Kerikil Biasa m3 350,000.00

3 BATU TELA Batu Tela bh 2,100.00 Batako 2,500.00

4 PASIR Urug m3 225,000.00 Pasang m3 350,000.00 Beton m3 450,000.00 Sirtu m3 225,000.00

5 TANAH Padas m3 73,000.00 Liat m3 73,000.00 Dastu m3 101,500.55

6 KAPUR Padam m3 210,450.00 Semen Merah m3 13,623.33

7 PORTLAND CEMENT Semen PC kg 1,700.00 Semen warna kg 12,500.00

II B A H A N P E N U T U P A T A P 1 SIRAP (100 lbr) pak 4,803.75 2 GENTENG BETON

Genteng Beton Warna standard bh 4,331.00 Genteng Beton Warna Special bh 4,556.70 Genteng Beton Warna Khusus bh 4,723.54 Kerpus Beton Warna Standard bh 4,925.55 Kerpus Beton Warna Special bh 5,161.64 Kerpus Beton Warna Khusus bh 5,451.44

Page 4: Analis Cipta Karya 2012-8 FEB 2012

Page 4 Daftar Harga Bahan 2012

3 GENTENG TANAH LIAT Vlaam bh 879.93 Kodok bh 996.74 Kodok Glasur bh 5,947.50 Nok kerpus Kodok bh 3,954.83 Nok kerpus Kodok Glasur bh 5,749.25 Plentong super besar bh 1,265.75 Nok kerpus plentong super bh 4,473.33

4 GENTENG KACA Vlaam tebal 3 mm bh 8,761.82 Vlaam tebal 5 mm bh 10,884.14 Kodok tebal 3 mm bh 9,882.00 Kodok tebal 5 mm bh 12,352.50

5 ASBES GELOMBANG BESAR Asbes Gelombang Besar Uk. 200 cm X 110 cm X 5 mm bh 70,353.33 Asbes Gelombang Besar Uk . 225 cm X 110 cm X 5 mm bh 82,350.00 Asbes Gelombang Besar Uk . 250 cm X 110 cm X 5 mm bh 93,330.00 Asbes Gelombang Besar Uk . 200 cm X 110 cm X 6 mm bh 74,298.00 Asbes Gelombang Besar Uk . 225 cm X 110 cm X 6 mm bh 86,467.50 Asbes Gelombang Besar Uk . 250 cm X 110 cm X 6 mm bh 97,996.50 Asbes Gelombang Kecil Asbes Gelombang Kecil uk . 150 cm X 105 cm X 4 mm bh 37,006.67 Asbes Gelombang Kecil uk . 180 cm X 105 cm X 4 mm bh 40,937.78 Asbes Gelombang Kecil uk . 210 cm X 105 cm X 4 mm bh 49,959.00 Asbes Gelombang Kecil uk . 240 cm X 105 cm X 4 mm bh 59,078.50 Asbes Gelombang Kecil uk . 270 cm X 105 cm X 4 mm bh 68,320.00 Asbes Gelombang Kecil uk. 300 cm X 105 cm X 4 mm bh 79,910.00 Asbes Gelombang Kecil uk . 150 cm X 80 cm X 4 mm bh 27,282.37 Asbes Gelombang Kecil uk . 180 cm X 80 cm X 4 mm bh 29,604.28 Asbes Gelombang Kecil uk . 210 cm X 80 cm X 4 mm bh 34,248.08 Asbes Gelombang Kecil uk . 240 cm X 80 cm X 4 mm bh 38,311.42 Asbes Gelombang Kecil uk . 270 cm X 80 cm X 4 mm bh 63,736.26 Asbes Gelombang Kecil uk . 300 cm X 80 cm X 4 mm bh 68,689.66

6 ASBES PLAT Asbes Plat Uk.100cm X 100 cm X 3 mm bh 16,116.20 Asbes Plat Uk.100cm X 100 cm X 4 mm bh 22,875.00 Asbes Plat Uk.100cm X 100 cm X 5 mm bh 25,833.50 Asbes Plat Uk.100cm X 100 cm X 6 mm bh 32,635.00 Nok Nok Asbes Kerpus Asbes 1050x300x4 bh 30,622.00 Nok Asbes Stel Besar bh 31,923.33 Nok Asbes Paten Besar bh 35,786.67 Nokstel gelombang Nokstel gelombang Stel Besar bh 37,210.00 Nokstel gelombang Patent Besar 30x116x0,6 bh 46,512.50 Nokstel gelombang Plat besar 120x240x0,4 bh 65,117.50

7 FIBRE GLASS Fiber Gelas 180 X 92 cm bh 44,530.00 Fiber Gelas 200 X 92 cm bh 50,782.50 Fiber Gelas 250 X 92 cm bh 54,086.67 Fiber Gelas 180 X 105 cm bh 60,186.67 Fiber Gelas 200 X 105 cm bh 66,693.33 Fiber Gelas 250 X 105 cm bh 73,200.00

Page 5: Analis Cipta Karya 2012-8 FEB 2012

Page 5 Daftar Harga Bahan 2012

8 SENG PLAT Seng Plat BJLS 0,18 m' 17,995.00 Seng Plat BJLS 0,20 x 90 m' 27,602.50 Seng Plat BJLS 0,28 m' 32,940.00 Seng Plat BJLS 0,30 x 90 m' 44,936.67

9 SENG GELOMBANG Seng Gelombang BJLS 0,18 panjang 180 cm lbr 48,393.33 Seng Gelombang BJLS 0,20 panjang 180 cm lbr 49,132.73 Seng Gelombang BJLS 0,30 panjang 180 cm lbr 68,930.00 Seng Gelombang BJLS 0,40 panjang 180 cm lbr 79,300.00

10 ZINCALUME Zincalume Tebal 0,30 mm m' 63,440.00 Zincalume Tebal 0,35 mm m' 73,200.00 Zincalume Tebal 0,40 mm m' 85,400.00 Zincalume Tebal 0,50 mm m' 103,700.00

III . B A H A N K A Y U 1 JATI Papan m3 18,471,875.00

Balok/pesagen m3 15,921,000.00 2 KAMPER Papan m3 8,845,000.00

Balok/pesagen m3 8,540,000.00 3 KRUING Papan m3 7,938,486.90

Balok/pesagen m3 7,238,666.67 4 MERANTI Papan m3 5,185,000.00

Balok/pesagen m3 4,819,000.00 5 LANAN/BEGESTING Papan m3 5,111,416.67

Balok/pesagen m3 4,544,500.00 6 BENGKIRAI Papan m3 12,098,333.34

Balok/pesagen m3 11,132,500.00 4 MATOA Papan m3 2,100,000.00

Balok m3 2,000,000.00 4 KAYU BESI Papan m3 3,750,000.00

Balok m3 3,400,000.00 7 DOLKEN

Ø 8 - 10 x 400 cm ( Kayu BAKAU) bt 35,000.00 Ø 19 x 300 cm ( kayu BAKAU) bt 25,000.00

8 SENGON m3 686,860.00 9 KAYU BAKAR m3 500,000.00 10 BAMBU (6-8/600 cm)

Dolken Bambu Ori bt 19,977.50

IV . BAHAN PENUTUP DINDING / LANTAI 1 UBIN (TEGEL BIASA)

Ubin PC polos 30 X 30 cm m2 41,175.00 Ubin PC polos 20 X 20 cm m2 37,820.00 Ubin PC Warna 30 X 30 cm m2 54,137.50 Ubin PC Warna 20 X 20 cm m2 47,122.50

Teraso 30 X 30 cm m2 85,705.00 Teraso 20 X 20 cm m2 81,587.50

2 TEGEL PLINT Tegel PC warna 10 X 20 cm bh 1,830.00

Tegel PC abu-abu 15 x 20 bh 4,971.50 3 POLIS UBIN Lantai/badan m' 10,827.50

Plint m' 13,877.50 Trap m' 19,062.50

Page 6: Analis Cipta Karya 2012-8 FEB 2012

Page 6 Daftar Harga Bahan 2012

5 UBIN PORSELIN Lokal 11 X 11 putih dos 61,813.33

11 X 11 warna dos 61,813.33 Lokal 15 X 15 putih dos 71,980.00

15 X 15 warna dos 71,980.00 6 MOZAIK PORSELIN

10 X 20 cm m2 115,290.00 15 X 15 cm m2 202,926.67 20 X 20 cm m2 130,133.33 20 X 25 cm m2 133,590.00

7 Keramik 30 X 30 cm m2 42,928.75 20 X 20 cm m2 52,982.86 33 x 33 cm m2 84,180.00 25 x 25 cm m2 83,773.33 15 x 20 cm m2 53,680.00

8 KARPET Classic Bali m2 82,553.33 9 Batu Tempel Hitam m2 117,933.33 10 GRANITO 40 x 40 cm m2 159,413.33

60 x 60 cm m2 193,166.67 11 Marmer m2 849,933.33 12 Batu Paras m2 43,716.67 V . B A H A N C E T A K 1 10 cm - 100 cm bh 30,500.00

Ø 15 cm - 100 cm bh 36,000.00 Ø 20 cm - 100 cm bh 42,700.00 Ø 30 cm - 100 cm bh 58,966.67 Ø 50 cm - 100 cm bh 79,300.00 Ø 60 cm - 100 cm bh 139,062.89 Ø 70 cm - 100 cm bh 155,550.00 Ø 80 cm - 100 cm bh 215,177.33 Ø 100 cm - 100 cm bh 291,122.33 U 10 cm - 100 cm bh 28,060.00 U 15 cm - 100 cm bh 34,160.00 U 20 cm - 100 cm bh 38,633.33 U 30 cm - 100 cm bh 43,920.00 U 50 cm - 100 cm bh 49,206.67

2 LUBANG ANGIN (ROSTER) PC + PASIR 10 X 20 cm bh 4,168.33 20 X 20 cm bh 7,509.59 25 X 25 cm bh 8,540.00 30 X 30 cm bh 9,760.00 15 X 25 cm bh 10,370.00 15 X 30 cm bh 10,980.00

BUIS BETON Ø

Page 7: Analis Cipta Karya 2012-8 FEB 2012

Page 7 Daftar Harga Bahan 2012

VI . B A H A N B E S I 1 BESI BETON besi beton polos kg 9,082.60

besi beton ulir kg 9,941.34 2 BESI PLAT Besi Strip kg 7,030.71 3 BESI GALVANIS Besi Galvanis kg 12,200.00 4 BESI PROFIL Besi Profil CNP/UNP kg 12,078.00

5 JARING - JARING BAJA

Ø 4 - 2100 x 5400 mm lbr 701,500.00

Ø 6 - 2100 x 5400 mm lbr 1,242,570.00

5 BESI SIKU L 30 X 30 X 3 kg 8,207.15

L 40 X 40 X 4 kg 8,207.15

L 50 X 50 X 5 kg 8,207.15

6 kg 19,586.67

- Harmonika 12 X 45 mm m2 32,228.33

- Kawat Nyamuk Nylon m2 34,998.75

- Kawat Kasa m2 17,283.33

- Saringan pasir m2 14,884.00

- Kawat loket m2 18,763.60

- Kawat duri rol 82,214.44

- Kawat bronjong kg 18,544.00 VII . B A H A N P I P A 1 Pipa PVC SNI 06-0084-2002/ Standar ISO 4422 , S -10 (10 bar)

Pipa PVC (1/2 ") SCJ m 3,025.60 Pipa PVC ( 3/4" ) SCJ m 4,453.00 Pipa PVC ( 1" ) SCJ m 7,588.40

2 Pipa PVC SNI 06-0084-2002/ Standar ISO 4422 , S -10 (12,5 bar) Pipa PVC ( 2" ) SCJ m 27,023.00 Pipa PVC ( 3" ) SCJ m 54,790.20 Pipa PVC ( 4" ) SCJ m 82,289.00

3 Pipa Medium B Galvanis - SII Pipa Medium B Galvanis DN ½" m 15,616.76 Pipa Medium B Galvanis DN 25 ( ¾" ) m 19,940.39 Pipa Medium B Galvanis DN 32 ( 1" ) m 26,491.54 Pipa Medium B Galvanis DN 50 ( 1½" ) m 38,739.94 Pipa Medium B Galvanis DN 63 ( 2" ) m 52,762.15 Pipa Medium B Galvanis DN 2½" m 84,323.35 Pipa Medium B Galvanis DN 90 ( 3" ) m 107,295.95 Pipa Medium B Galvanis DN 110 ( 4" ) m 151,646.00 Pipa Medium B Galvanis DN 160 ( 6" ) m 242,414.00 Pipa Medium B Galvanis DN 160 ( 8" ) m 436,180.50 Pipa Medium B Galvanis DN 160 ( 10" ) m 615,815.33

KAWAT - Ikat beton/bendrat

Page 8: Analis Cipta Karya 2012-8 FEB 2012

Page 8 Daftar Harga Bahan 2012

4 Pipa Medium A Galvanis - SII Pipa Medium A Galvanis DN ½" m 19,977.50 Pipa Medium A Galvanis DN 25 ( ¾" ) m 25,620.00 Pipa Medium A Galvanis DN 32 ( 1" ) m 41,124.17 Pipa Medium A Galvanis DN 50 ( 1½" ) m 61,254.17 Pipa Medium A Galvanis DN 63 ( 2" ) m 83,163.33 Pipa Medium A Galvanis DN 2½" m 104,310.00 Pipa Medium A Galvanis DN 90 ( 3" ) m 132,166.67 Pipa Medium A Galvanis DN 110 ( 4" ) m 193,166.67

VIII . B A H A N L A N G I T - L A N G I T 1 AKUSTIK-uk : 30 X 30 lbr 13,725.00

30 X 60 lbr 15,961.67 60 X 120 lbr 22,875.00

List Kayu Profil 2 x 4 m' 7,747.00 2 SOFT BOARD-uk: 4'X 8'

Gypsum tebal 9 mm lbr 74,013.33 3 HARD BOARD-uk: 4'X 8' lbr 118,950.00 4 PLY WOOD

Teak wood 90 X 210 X 3 mm lbr 80,926.67 . 120 X 240 X 3 mm lbr 92,720.00 . 90 X 210 X 4 mm lbr 104,920.00 . 90 X 210 X 9 mm lbr 164,700.00 . 90 X 210 X 12 mm lbr 256,200.00 . 90 X 210 X 15 mm lbr 296,866.67 . 90 X 210 X 18 mm lbr 307,033.33 Tripleks . 120 X 240 X 3 mm lbr 51,683.64 . 120 X 240 X 4 mm lbr 67,527.00 . 120 X 240 X 6 mm lbr 80,723.33 Multipleks . 120 X 240 X 9 mm lbr 127,612.00 . 120 X 240 X 12 mm lbr 177,144.00 . 120 X 240 X 15 mm lbr 219,600.00 . 120 X 240 X 18 mm lbr 244,406.67 Formika ukuran pintu lbr 63,440.00

IX . B A H A N F I N I S H I N G 1 KAYU

Menie kg 22,147.69 Dempul plamur kg 19,131.82 Ambril/amplas lbr 3,331.54 Batu Apung kg 6,100.00 Cat dasar kg 21,984.40 Cat Penutup kg 31,354.00 . Sirlax ons 20,629.09 . Spiritus ltr 10,425.45 . Plitur jadi ltr 44,053.09

2 TEMBOK Kalkarium kg 5,591.67 Kapur sirih kg 8,235.00 Plamur kg 26,352.00 Cat Dasar kg 39,772.00 Cat Penutup kg 56,933.33

Page 9: Analis Cipta Karya 2012-8 FEB 2012

Page 9 Daftar Harga Bahan 2012

3 BESI Menie kg 21,738.18 Cat mengkilat kg 46,512.50 Cat dasar kg 18,300.00 Thinner A ltr 18,410.91 Minyak cat ltr 11,285.00 Thinner Super ltr 18,367.78 Residu (teer/aspal) blek 91,500.00

X . B A H A N K A C A 1 POLOS 3 mm m2 61,732.00

5 mm m2 76,372.00 2 ES KABUR 3 mm m2 77,775.00

5 mm m2 102,480.00 3 RAY BAND 3 mm m2 65,270.00

5 mm m2 84,790.00 XI . BAHAN INSTALASI LISTRIK 1 KABEL LISTRIK

N Y A : . 1 X 1 1/2 mm2 m' 1,240.33 SPLN LMK 1LMK 1 X 2 1/2 mm2 m' 2,379.00 N Y M : . 2 X 1 1/2 mm2 m' 2,257.00 SPLN 42-2LMK 2 X 2 1/2 mm2 m' 4,148.00

2 SKAKELAR Out bauw . Seri bh 10,736.00 . Engkel bh 11,224.00 In bauw . Seri bh 11,386.67 . Engkel bh 9,760.00

3 FUSE BOX (SEKERING KASA) 1 group bh 28,670.00 2 group bh 50,935.00

4 STEKER - Biasa bh 8,692.50 Arde bh 13,725.00 T Biasa bh 7,472.50 T dengan Arde bh 14,640.00

5 FITING Flaon bh 6,710.00 Gantung bh 2,948.33 Kap bh 6,710.00 Kombinasi bh 7,930.00

6 bh 10,248.00 Arde Outbow hitam bh 5,642.50 Arde IB bh 11,895.00 Arde Putar bh 15,402.50

XII . ALAT - ALAT PENGUNCI & PENGGANTUNG 1 KUNCI TANAM Union : 1 X slag bh 118,950.00

2 X slag bh 140,300.00 Yale : 1 X slag bh 152,500.00

2 X slag bh 246,033.33 Kuda : 1 X slag bh 67,100.00

2 X slag bh 68,625.00

STOP KONTAK - Arde Outbow putih

Page 10: Analis Cipta Karya 2012-8 FEB 2012

Page 10 Daftar Harga Bahan 2012

2 ENGSEL DAN GERENDEL Engsel Angin bh 26,673.64 Kupu-kupu biasa bh 6,987.27 Nylon kupu-kupu bh 14,843.33 Espagnoled - dalam negeri bh 21,350.00 Grendel Tanam luar negeri bh 49,943.75 Grendel biasa bh 6,786.25 Kait Angin bh 7,930.00 Door Stop bh 32,177.50

XIII . BAHAN SANITAIR 1 KLOSET DUDUK bh 532,918.18 2 KLOSET JONGKOK bh 114,883.33 3 WASTAFEL MEJA OVAL bh 266,875.00 4 WASTAFEL GANTUNG BULAT bh 302,966.67 5 WASTAFEL GANTUNG SUDUT bh 91,500.00 6 WASTAFEL GANTUNG SUDUT KECIL bh 314,150.00 7 WASTAFEL BAK CUCI bh 249,422.22 8 TEMPAT SABUN GANTUNG bh 54,900.00 9 TEMPAT SABUN TANAM bh 37,653.64 10 LAIN - LAIN

Kran Air bh 15,707.50 Seal tape bh 4,244.58 Floor drain bh 9,353.33

XIV . ALAT PENGIKAT KAYU 1 Paku Biasa 1/2" - 1" kg 16,644.29

Paku Biasa 2" - 5 " kg 15,600.00 2 PAKU - payung kg 25,742.00 3 PAKU - sekrup doos 17,435.83 4 PAKU - beton doos 28,103.57 5 MUR BAUT (kuda-kuda) kg 10,675.00 6 ANGKUR BAUT KG 9,068.67 7 LEM KAYU bh 14,663.46

Paku Ramset bh 27,450.00 8 Tali Ijuk kg 3,863.33 XV . POMPA AIR. 1 POMPA AIR TANGAN

Dragon buatan Indonesia bh 393,450.00 2 POMPA AIR LISTRIK

Sanyo 100 watt bh 522,973.33 Fuji 250 watt bh 854,000.00 Shimizu . 125 watt bh 417,748.33

. 90 watt bh 686,250.00 D a b . 125 watt bh 183,000.00

. 175 watt bh 923,000.00 . 200 watt bh 568,000.00 . 250 watt bh 923,000.00 . 375 watt bh 1,231,000.00 . 500 watt bh 1,436,000.00

Page 11: Analis Cipta Karya 2012-8 FEB 2012

Page 11 Daftar Harga Bahan 2012

X VI . PAVING BLOCK 1 Tebal 6 cm tebal 6 cm (K.200) m2 59,135.52

tebal 6 cm (K.250) m2 63,436.02 tebal 6 cm (K.300) m2 66,516.52 tebal 6 cm (K.400) m2 70,603.52

2 Tebal 8 cm tebal 8 cm (K.250) m2 84,703.36 tebal 8 cm (K.300) m2 91,199.86 tebal 8 cm (K.400) m2 98,336.86

3 Kanstien 13/16 X 28 X 50 (K.200) bh 21,372.32 4 Kanstien 10 x 20 x 50 (K.200) bh 11,765.29 5 Paving Segitiga Kecil (Topi Uskup Kecil)

Tebal 6 cm K.300 m2 70,115.52 Tebal 8 cm K.300 m2 96,864.02

6 Paving Segitiga Besar (Topi Uskup Besar) Tebal 6 cm K.300 m2 71,496.86 Tebal 8 cm K.300 m2 98,245.36

XVII. L A I N - L A I N 1 KREI 25 MM m2 226,000.00 2 Sliding Pintu J3 btg 91,500.00

Sliding Pintu J4 btg 158,600.00 Sliding Pintu J5 btg 244,000.00

3 Naco per Daun bh 18,910.00 4 Rolling door Besi m2 718,000.00

Rolling door Almunium m2 820,000.00 5 Awning Almunium m2 651,000.00 6 Kusen Almunium 4" Putih m' 100,345.00 10 K A C A

Dark Grey 5 mm m2 80,926.67 Dark Blue 5 mm m2 97,600.00

11 Bilik Bambu m2 30,000.00 12 PAGAR BRC.

Pagar BRC 90 A2 /lb 249,185.00 Pagar BRC 120 A2 /lb 291,173.33 Pagar BRC 175 A3 /lb 988,200.00 Pagar BRC 190 A3 /lb 1,098,000.00 Tiang BRC lengkap P.90-0 1 1/2" /bt 164,700.00 Tiang BRC lengkap P.120-0 1 1/2" /bt 219,600.00 Tiang BRC lengkap P.175-0 1 1/2" /bt 274,500.00 Tiang BRC lengkap P.190-0 1 1/2" /bt 406,260.00

13. LAIN-LAINMinyak Beton & bekisting ltr 41,000.00 Minyak Pelumas ltr 48,800.00 Profil Alumunium T m 126,000.00 Alumunium Strip m 15,000.00 Skrup fixer bh 1,423.33 Sealent tube 13,623.33 Pintu Lipat Besi m2 820,000.00 Sunscreen Allumunim m2 779,000.00 Allumunium Foil m2 42,700.00 Wallpaper m2 93,000.00 Soda api kg 18,000.00 Sabun kg 21,000.00 Kuas bh 16,000.00 Kuas Alang-alang ikat 11,000.00 Air m3 29,000.00 Kawat Las kg 30,000.00

Lem Aica Aibon kg 25,000.00

Pintu Kamar Mandi + Kusen PVC 275,000.00

Page 12: Analis Cipta Karya 2012-8 FEB 2012

Page 12 Daftar Harga Bahan 2012

Fibre glass (tanki air):

kapasitas 550 liter. unit 808,685.71

kapasitas 1100 liter. unit 1,377,728.57

kapasitas 1500 liter. unit 3,057,000.00

kapasitas 3000 liter. unit 4,921,000.00

kapasitas 5000 liter. unit 7,570,000.00

Purwodadi, Desember 2011

: …………………

Sekretaris Dinas Kepala Dinas

NIP.19611023 198608 1 001 Cipta Karya Tata Ruang dan Kebersihan

Kabupaten Grobogan

: …………………

Kepala Bidang Perumahan dan Permukiman

NIP.19690911 199603 1 002

Ir. Muchamad Chanif, MT

: ………………… NIP.19611007 199003 1 004

Kepala Bidang Tata Ruang

NIP.19720503 199703 1 006

: …………………

Kepala Bidang Kebersihan

NIP.19590727 199203 1 004

: …………………

Kepala Bidang Pertamanan dan PJU

NIP.19660627 199303 1 009

Diperiksa oleh :

1. Aditya Wahyu Wardhana, SH, MM

2. Aris Munandar, ST, MT

3. Joni Sarjono, ST

4. Ir Ahmad Wahib Suyuti

5. Ir. Budi Prihantoro, Msi

Page 13: Analis Cipta Karya 2012-8 FEB 2012

Page 13 sat.pekerjaan

D A F T A R H A R G A S A T U A N P E K E R J A A N

SUMBER DATA : P A S A R A N B E B A S

DAERAH : KABUPATEN MIMIKA

EDISI : Edisi Desember 2012

HARGA SATUAN

NO. SNI KODE URAIAN PEKERJAAN SAT PEKERJAAN

(Rp)

I T-12-2002 6 PEKERJAAN PERSIAPAN

6.2.a Membuat 1 m Pagar Sementara dari Seng Gelombang Tinggi 2,00 m m' 68,000.00

6.4 Mengukur dan Memasang 1 m Bouwplank m' 23,250.00

6.5a Membuat 1m2 Kantor Sementara dg Lantai Plesteran m2 582,500.00

6.6a Membuat 1m2 Gudang Semen dan Alat-alat m2 357,500.00

6.8 Membersihkan 1 m2 Lapangan dan Perataan m2 17,500.00

6.11 Membuat 1m2 Steger dari Bambu Uk. 40 x 50 x 20 cm m2 44,195.00

6.13 Membongkar 1m3 Beton Bertulang m3 1,388,300.00

6.14 Membongkar 1 m3 Dinding Tembok Bata Merah m3 671,650.00

II 2835:2008 6 PEKERJAAN TANAH

6.1 Menggali 1m³ Tanah Biasa Sedalam 1 m m3 78,750.00

6.2 Menggali 1m³ Tanah Biasa Sedalam 2 m m3 96,750.00

6.3 Menggali 1m³ Tanah Biasa Sedalam 3 m m3 115,050.00

6.4 Menggali 1m³ Tanah Keras Sedalam 1 m m3 104,800.00

6.5 Menggali 1m³ Tanah Cadas Sedalam 1 m m3 159,000.00

6.6 Menggali 1m³ Tanah Lumpur Sedalam 1 m m3 126,750.00

6.7 Mengerjakan 1m² Striping Tebing Setinggi 1 m m2 5,750.00

6.8 Membuang 1m³ Tanah sejauh 15 m' m3 34,500.00

6.9 Mengurug Kembali 1m³ galian (dihitung 1/3 kali indeks pekerjaan galian) m3 1/3 x Gal.tanah

6.10 Memadatkan 1m³ Tanah (per 20 cm) m3 57,500.00

6,11.a Mengurug 1m³ Pasir Urug m3 31,500.00

6,11.b Mengurug 1m³ Tanah Padas m3 31,500.00

6.12 Memasang 1m³ Lapisan Pudel Cmp. 1KP : 3PP : 7TL m3 142,000.00

6.14 Memasang 1m² Lapisan Ijuk tebal 10 cm untuk bidang Resapan m2 17,250.00

6,15.a Mengurug 1m³ Sirtu Padat untuk Peninggian Lantai Bangunan m3 28,750.00

6,15.b Mengurug 1m³ Tanah Padas untuk Peninggian Lantai Bangunan m3 28,750.00

III 2836:2008 6 PEKERJAAN PONDASI

6.1 Memasang 1m³ Pondasi Batu Belah, Campuran 1PC : 3 PP m3 #REF!

6.2 Memasang 1m³ Pondasi Batu Belah, Campuran 1PC : 4 PP m3 255,000.00

6.3 Memasang 1m³ Pondasi Batu Belah, Campuran 1PC : 5 PP m3 255,000.00

6.4 Memasang 1m³ Pondasi Batu Belah, Campuran 1Pc : 6 PP m3 255,000.00

6.5 Memasang 1m³ Pondasi Batu Belah, Campuran 1PC : 8 PP m3 -

6.6 Memasang 1m³ Pondasi Batu Belah, Campuran 1KP : 1SM : 2PP m3 255,000.00

6.7 Memasang 1m³ Pondasi Batu Belah, Campuran 1 Pc : 3 Kp : 10 PP m3 255,000.00

6.8 Memasang 1m³ Pondasi Batu Belah, Campuran ¼ Pc : 1Kp : 4 PP m3 255,000.00

6.9 Memasang 1m³ Pondasi Batu Kosong (Aanstamping) m3 566,100.00

6.10 Memasang 1m³ Pondasi Siklop, 60% Beton, Campuran 1PC : 2PB : 3KR & 40% Batu Belah m3 433,500.00

6.11 Memasang 1m³ Pondasi Sumuran diameter 100 cm m3 357,850.00

IV 6897:2008 6 PEKERJAAN DINDING

6.1 Memasang 1 m² Dinding Bata Merah ukuran (5x11x22) cm Tebal 1 Bata, Campuran Spesi 1PC : 2PP m2 89,500.00

6.2 Memasang 1 m ² Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Campuran spesi 1PC : 3PP m2 89,500.00

6.3 Memasang 1 m² Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Campuran Spesi 1PC : 4PP m2 89,500.00

6.4 Memasang 1 m² Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Campuran Spesi 1PC : 5PP m2 89,500.00

6.5 Memasang 1 m² Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Campuran Spesi 1PC : 6PP m2 89,500.00

6.6 Memasang 1 m² Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Campuran Spesi 1PC : 3 KP :10PP m2 85,000.00

6.7 Memasang 1 m² Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1/2 Bata Campuran Spesi 1PC : 2PP m2 44,750.00

6.8 Memasang 1 m² Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1/2 Bata Campuran Spesi 1PC : 3PP m2 44,750.00

6.9 Memasang 1m² Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1/2 Bata Campuran Spesi 1PC : 4PP m2 44,750.00

6.10 Memasang 1m² Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1/2 Bata Campuran Spesi 1PC : 5PP m2 44,750.00

6.11 Memasang 1m² Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1/2 Bata Campuran Spesi 1PC : 6PP m2 44,750.00

6.12 Memasang 1m² Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1/2 Bata Campuran Spesi 1PC : 8PP m2 44,750.00

6.13 Memasang 1m² Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1/2 Bata Campuran Spesi 1PC : 3KP : 10PP m2 44,750.00

V 2837:2008 6 PEKERJAAN PLESTERAN

6.1 Membuat 1 m² Plesteran 1 PC : 1 PP, Tebal 15 mm m2 51,000.00

6.2 Membuat 1 m² Plesteran 1 PC : 2 PP Tebal 15 mm m2 51,000.00

6.3 Membuat 1 m² Plesteran 1 PC : 3 PP Tebal 15 mm m2 51,000.00

6.4 Membuat 1 m² Plesteran 1 PC : 4 PP Tebal 15 mm m2 51,000.00

Page 14: Analis Cipta Karya 2012-8 FEB 2012

Page 14 sat.pekerjaan

HARGA SATUAN

NO. SNI KODE URAIAN PEKERJAAN SAT PEKERJAAN

(Rp)

6.5 Membuat 1 m² Plesteran 1 PC : 5 PP Tebal 15 mm m2 51,000.00

6.6 Membuat 1 m² Plesteran 1 PC : 6 PP Tebal 15 mm m2 51,000.00

6.7 Membuat 1 m² Plesteran 1 PC : 7 PP Tebal 15 mm m2 51,000.00

6.8 Membuat 1 m² Plesteran 1 PC : 8 PP Tebal 15 mm m2 51,000.00

6.9 Membuat 1 m² Plesteran 1 PC : 1/2 KP : 3 PP Tebal 15 mm m2 51,000.00

6.10 Membuat 1 m² Plesteran 1 PC : 2 KP : 8 PP Tebal 15 mm m2 51,000.00

6.11 Membuat 1 m² Plesteran 1 SM : 1 KP : 1 PP Tebal 15 mm m2 51,000.00

6.12 Membuat 1 m² Plesteran 1 SM : 1 KP : 2 PP Tebal 15 mm m2 51,000.00

6.13 Membuat 1 m² Plesteran 1 PC : 2 PP Tebal 20 mm m2 68,300.00

6.14 Membuat 1 m² Plesteran 1PC : 3PP Tebal 20 mm m2 68,300.00

6.15 Membuat 1 m² Plesteran 1 PC : 4 PP Tebal 20 mm m2 68,300.00

6.16 Membuat 1 m² Plesteran 1PC : 5PP Tebal 20 mm m2 66,950.00

6.17 Membuat 1 m² Plesteran 1PC : 6PP Tebal 20 mm m2 66,950.00

6.18 Membuat 1 m² Plesteran 1 SM : 2 KP : 2 PP Tebal 20 mm m2 71,500.00

6.19 Membuat 1 m² Berapen 1 PC : 5 PP Tebal 15 mm m2 25,650.00

6.20 Membuat 1 m¹ Plesteran Skoning lebar 10 mm 1 PC : 2PP m' 58,600.00

6.23 Membuat 1 m² Plesteran Ciprat/Kamprotan 1PC : 2 PP m2 44,750.00

6.24 Membuat 1 m² Finishing Siar Pasangan Dinding Bata Merah (=20 m') m2 25,650.00

6.25 Membuat 1 m² Finishing Siar Pasangan Dinding Conblock ekspose (=8 m') m2 75,050.00

6.26 Membuat 1 m² Finishing Siar Pasangan Batu Kali Adukan 1PC : 2PP m2 48,750.00

6.27 Membuat 1 m² Acian m2 34,000.00

VI 3434:2008 6 PEKERJAAN KAYU

6.1 Membuat dan Memasang 1m³ Kusen Pintu dan Kusen Jendela, Kayu klas I (Kayu Jati) m3 3,377,500.00

6.2 Membuat dan Memasang 1m³ Kusen Pintu dan Kusen Jendela Kayu klas II (kayu Kamper) m3 2,895,000.00

6.3 Membuat dan Memasang 1m² Pintu Klamp Standard Kayu Klas II (Kayu Kamfer) m2 168,950.00

6.5 Membuat dan Memasang 1m² Daun Pintu Panel Kayu Kayu Klas II (Kayu Kamfer) m2 482,500.00

6.6 Membuat dan Memasang 1m² Pintu dan Jendela Kaca Kayu Klas II (Kayu Kamfer) m2 386,000.00

6.7 Membuat dan Memasang 1m² Pintu dan Jendela Jalusi Kayu Klas I (Kayu Jati) m2 482,500.00

6.8 Membuat 1m² Daun Pintu kayu lapis (Plywood) Rangkap, Rangka Tertutup Kayu Klas II (lebar sampai 90 cm) m2 337,750.00

6.9 Membuat 1m² Pintu Plywood rangkap, rangka expose kayu klas II (Kayu Kamfer) m2 386,000.00

6.10 Memasang 1m² Jalusi Kusen Kayu Klas I (kayu Jati) m2 367,250.00

6.11 Memasang 1m² Teakwood Rangkap, Rangka Expose Kayu Klas I (Kayu Jati) m2 386,000.00

6.12 Memasang 1m² Pintu Teakwood Rangkap Lapis Formika, Rangka expose Kayu Klas II Rangka expose Kayu Klas m2 410,200.00

6.13 Memasang 1m³ Konstruksi Kuda-kuda Konvensional Kayu Kelas II Bentang 6 meter m3 1,930,000.00

6.14 Memasang 1m³ Konstruksi Kuda-kuda Expose, Kayu Klas I (Kayu Jati) m3 3,232,750.00

6.15 Memasang 1m³ konstruksi Gording, Kayu Klas II Kayu Kamfer m3 1,158,000.00

6.16 Memasang 1m² Usuk Reng Genteng Lokal, Kayu Klas II Kayu Kamfer m2 23,250.00

6.17 Memasang 1m² Usuk Reng Genteng Beton, Kayu Klas II Kayu Kamfer m2 23,250.00

6.18 Memasang 1m² Rangka Atap Sirap, Kayu Klas II (Kayu Kamfer) m2 27,900.00

6.19 Memasang 1m² Rangka Langit-langit (50x100) cm, kayu Klas II Kayu Kamfer m2 63,750.00

6.20 Memasang 1m² Rangka Langit-langit (60x60) cm, kayu Klas II atau III Kayu Kamfer m2 59,000.00

6.21 Memasang 1m¹ Listplank Uk. (3x20)cm Kayu klas I (Kayu Jati) m' 35,750.00

6.22 Memasang 1m¹ Listplank Uk. (3x30)cm Kayu klas I atau klas II Kayu Kamfer m' 35,750.00

6.23 Memasang 1m² Rangka Dinding Pemisah (60x120) cm Kayu klas II atau III Kayu Kamfer m2 72,450.00

6.24 Memasang 1m² Dinding Pemisah Teakwood Rangkap Rangka Kayu Klas II Kayu Kamfer m2 72,450.00

6.26 Memasang 1m² Dinding Lambriziring dari Papan klas I (Kayu Jati) m2 289,500.00

6.27 Memasang 1m² Dinding Lambriziring dari Plywood ukuran (120x240) cm m2 12,070.00

6.28 Memasang 1m² Dinding Bilik, Rangka Kayu Klas III (Kayu Meranti) m2 17,000.00

VII 7394:2008 6 PEKERJAAN BETON

6.2 Membuat 1m³ Beton mutu f'c=9,8 Mpa (K125), slum (12±2)cm, w/c = 0,78 m3 211,900.00

6.3 Membuat 1m³ Beton mutu f'c=12,2 Mpa (K150), slum (12±2)cm, w/c = 0,78 m3 211,900.00

6,4a Membuat 1m³ Beton mutu f'c=7,4 MPa (K100), slum (12±2)cm, w/c = 0,78 m3 145,900.00

6.5 Membuat 1m³ Beton mutu f'c=14,5 MPa (K175), slum (12±2)cm, w/c = 0,66 m3 208,250.00

6.6 Membuat 1m³ Beton mutu f'c=16,9 MPa (K200), slum (12±2)cm, w/c = 0,61 m3 208,250.00

6.7 Membuat 1m³ Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 m3 208,250.00

6.8 Membuat 1m³ Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 m3 208,250.00

6,9a Membuat 1m³ Beton mutu f'c=24,0 MPa (K275), slum (12±2)cm, w/c = 0,53 m3 208,250.00

6.10 Membuat 1m³ Beton mutu f'c=26,4 MPa (K300), slum (12±2)cm, w/c = 0,52 m3 208,250.00

6.11 Membuat 1m³ Beton mutu f'c=28,8 MPa (K325), slum (12±2)cm, w/c = 0,49 m3 269,500.00

6.12 Membuat 1m³ Beton mutu f'c=31,2 MPa (K350), slum (12±2)cm, w/c = 0,48 m3 269,500.00

6.17 Pembesian 1 Kg dengan Besi Ulir 1 Kg 91,895.00

6.18 Memasang 1 Kg Kabel Presstresed Polos/strands 1 Kg 90,260.00

6.19 Memasang 1 Kg Jaring Kawat baja/Wire Mesh 1 Kg 89,090.00

6.20 Memasang 1 m² Bekisting untuk Pondasi m2 88,400.00

6.21 Memasang 1 m² Bekisting untuk Sloof m2 88,400.00

Page 15: Analis Cipta Karya 2012-8 FEB 2012

Page 15 sat.pekerjaan

HARGA SATUAN

NO. SNI KODE URAIAN PEKERJAAN SAT PEKERJAAN

(Rp)

6.22a Memasang 1 m² Bekisting untuk Kolom m2 112,200.00

6.23a Memasang 1 m² Bekisting untuk Balok m2 112,200.00

6.24a Memasang 1 m² Bekisting untuk Lantai m2 112,200.00

6.25a Memasang 1 m² Bekisting untuk Dinding m2 112,200.00

6.26a Memasang 1 m² Bekisting untuk Tangga m2 112,200.00

6.27a Memasang 1 m² Jembatan Cor m2 22,450.00

6.28 Membuat 1 m³ Pondasi Beton Bertulang (150 kg Besi + Bekisting) m3 897,800.00

6.29 Membuat 1 m³ Sloof Beton Bertulang (200 kg Besi + Bekisting) m3 1,011,750.00

6.30a Membuat 1 m³ Kolom Beton Bertulang (300 kg Besi + Bekisting) m3 1,261,150.00

6.31a Membuat 1 m³ Balok Beton Bertulang (200 kg Besi + Bekisting) m3 1,098,400.00

6.32a Membuat 1 m³ Plat Beton Bertulang (150 kg Besi + Bekisting) m3 898,250.00

6.33a Membuat 1 m³ Dinding Beton Bertulang (150 kg Besi + Bekisting) m3 897,800.00

6.34a Membuat 1 m³ Tangga Beton Bertulang (200 kg Besi + Bekisting) m3 1,011,750.00

6.35 Membuat 1 m¹ Kolom Penguat Beton Bertulang (11 x 11) cm m' 26,850.00

6.36 Membuat 1 m¹ Ring Balok Beton Bertulang (10 x 15) cm m' 42,840.00

VIII 03-3436-1994 6 PEKERJAAN PENUTUP ATAP

6.1 Memasang 1 m² Atap Genteng Plentong Kecil m2 25,650.00

6.2 Memasang 1 m² Atap Genteng Kodok / Glasur m2 25,650.00

6.3 Memasang 1 m² Atap Genteng Plentong Super / Besar m2 23,700.00

6.4 Memasang 1 m Genteng Bubung Plentong m' 65,300.00

6.5 Memasang 1 m Genteng Bubung Kodok / Glasur m' 65,300.00

6.6 Memasang 1 m Genteng Bubung Plentong Besar m' 65,300.00

6.9 Memasang 1 m² Atap Asbes Gelombang ( 240 cm X 108 cm X 0,5 cm) m2 24,650.00

6.10 Memasang 1 m² Atap Asbes Gelombang ( 210 cm X 108 cm X 0,5 cm ) m2 23,800.00

6.12 Memasang 1 m² Atap Asbes Gelombang ( 300 cm X 105 cm X 4 mm ) m2 23,800.00

6.15 Memasang 1 m² Atap Asbes Gelombang ( 210 cm X 105 cm X 4 mm ) m2 23,470.00

6.30 Memasang 1 m² Atap Genteng Beton m2 34,000.00

6.33 Memasang 1 m² Atap Sirap m2 49,050.00

6.34 Memasang 1 m Nok Genteng Beton m' 68,000.00

6.37 Memasang 1 m Nok Sirap m' 44,650.00

6.38 Memasang 1 m² Atap Seng Gelombang m2 20,400.00

6.39 Memasang 1 m Atap Nok Seng m' 24,800.00

6.42 Memasang 1 m² Allumunium Foil / Sisalation m2 22,450.00

IX 2839:2008 6 PEKERJAAN LANGIT-LANGIT

6,1.b Memasang 1 m² Langit-langit Asbes Semen Tebal 5 mm m2 12,350.00

6,1.c Memasang 1 m² Langit-langit Asbes Semen, tebal 6 mm m2 12,350.00

6.2 Memasang 1 m² Langit-langit Akustik Ukuran (30x30) cm m2 27,900.00

6.3 Memasang 1 m² Langit-langit Akustik Ukuran (30x60) cm m' 23,250.00

6.4 Memasang 1 m² Langit-langit Akustik Ukuran (60x120) cm m' 23,250.00

6,5.a Memasang 1 m² Langit-langit Tripleks Uk (120x240) cm, Tebal 3 mm m' 23,250.00

6,5.b Memasang 1 m² Langit-langit Tripleks Uk (120x240) cm,Tebal 4 mm m2 23,250.00

6,5.c Memasang 1 m² Langit-langit Tripleks Uk (120x240) cm, Tebal 6 mm m2 23,250.00

6.6 Memasang 1 m² Langit-langit Lambriziring Kayu, tebal 9 mm m2 23,800.00

6.7 Memasang 1 m² Langit-langit Gypsum Board, Ukuran (1200x24000x9) mm m2 17,000.00

6.9 Memasang 1 m² Langit-langit Akustik Uk (60x120) cm + Rangka Allumunium m2 116,250.00

6.10 Memasang 1 m¹ List Langit-Langit Kayu Profil m2 11,700.00

#REF! #REF!

X RSNI T-15-2002 6 PEKERJAAN SANITASI

6.1 Memasang 1 Buah Closet Duduk / Mono Blok Unit 475,150.00

6.2 Memasang 1 Buah Closet Jongkok Porselen Unit 514,000.00

6.4 Memasang 1 Buah Urinoir Unit 240,000.00

6.5 Memasang 1 Buah Wastafel Unit 173,450.00

6.8 Memasang 1 Unit Bak Mandi Batu Bata Volume 0,30 m3 Unit 1,020,000.00

6.14 Memasang 1 m Pipa Beton, Ø 20 cm - 100 cm m' 23,800.00

6.15 Memasang 1m Pipa Beton, Ø 30 cm - 100 cm m' 64,600.00

6.19 Memasang 1 m Pipa Medium A Galvanis DN ½" m' 20,700.00

6.20 Memasang 1 m Pipa Medium A Galvanis DN 25 ( ¾" ) m' 20,700.00

6.21 Memasang 1 m Pipa Medium A Galvanis DN 32 ( 1" ) m' 29,205.00

6.22 Memasang 1 m Pipa Medium A Galvanis DN 50 ( 1½" ) m' 34,110.00

6.23 Memasang 1 m Pipa Medium A Galvanis DN 90 ( 3" ) m' 34,110.00

6.24 Memasang 1 m Pipa Medium A Galvanis DN 110 ( 4" ) m' 42,645.00

6.25 Memasang 1 m1 Pipa PVC SNI 06-0084-2002 SCJ S10(10 bar) Ø 1/2" m' #VALUE!

6.26 Memasang 1 m1 Pipa PVC SNI 06-0084-2002 SCJ S10(10 bar) Ø 3/4" m' #VALUE!

6.27 Memasang 1 m1 Pipa PVC SNI 06-0084-2002 SCJ S10(10 bar) Ø 1" m' #VALUE!

6.29 Memasang 1 m1 Pipa PVC SNI 06-0084-2002 SCJ S12,5(10 bar) Ø 2" m' #VALUE!

C193
User:
D193
User:
G193
User:
H193
User:
C194
User:
D194
User:
G194
User:
H194
User:
Page 16: Analis Cipta Karya 2012-8 FEB 2012

Page 16 sat.pekerjaan

HARGA SATUAN

NO. SNI KODE URAIAN PEKERJAAN SAT PEKERJAAN

(Rp)

6.31 Memasang 1 m1 Pipa PVC SNI 06-0084-2002 SCJ S12,5(10 bar) Ø 3" m' #VALUE!

Page 17: Analis Cipta Karya 2012-8 FEB 2012

Page 17 sat.pekerjaan

HARGA SATUAN

NO. SNI KODE URAIAN PEKERJAAN SAT PEKERJAAN

(Rp)

6.32 Memasang 1 m1 Pipa PVC SNI 06-0084-2002 SCJ S12,5(10 bar) Ø 4" m' #VALUE!

6.33 Memasang 1 buah Bak Cuci Piring Stainles Steel Buah #VALUE!

6.35 Memasang 1 buah Kran Ø ¾" atau ½" Buah #VALUE!

6.36 Memasang 1 buah Floor Drain Buah #VALUE!

XI 7393:2008 6 PEKERJAAN BESI & ALLUMUNIUM

6.1 Memasang 1 kg Besi Profil Kg #VALUE!

6.2 Memasang 1 kg Rangka Kuda-kuda Baja IWF kg #VALUE!

6.3 Mengerjakan 100 kg Pekerjaan Perakitan 100 kg 13,950.00

6.4 Membuat 1 m² Pintu Besi Plat Baja tebal 2 mm rangkap, rangka baja Siku m2 111,310.00

6.5 Mengerjakan 10 cm Pengelasan dengan Las Listrik cm #VALUE!

6.7 Memasang 1 m² Pintu Rolling Door Besi m2 52,777.00

6.9 Memasang 1 m² Sunscreen Allumunium m2 #VALUE!

6.10 Memasang 1 m² Rolling Door Allumunium m2 #VALUE!

6.11 Memasang 1 m Kusen Pintu Allumunium m' #VALUE!

6.12 Memasang 1 m² Pintu Allumunium Strip Lebar 8 cm m2 #VALUE!

6.13 Memasang 1 m² Pintu Kaca Rangka Allumunium m2 #VALUE!

6.14 Memasang 1 m² Venetions Blinds & Vertical Blinds m2 #VALUE!

6.15 Memasang 1 m² Terali Besi Strip (2x3) cm m2 #VALUE!

6.16 Memasang 1 m² Kawat Nyamuk m2 #VALUE!

6.17 Memasang 1 m² Jendela Nako & Tralis m2 #VALUE!

6.18 Memasang 1 m¹ Talang Datar/Jurai , Seng BJLS 28 Lebar 90 cm m' #VALUE!

6.19 Memasang 1 m¹ Talang 1/2 Lingkaran Ø 15 cm, Seng Plaat BJLS 30 Lebar 45 cm m' #VALUE!

XII Pt T-30-2000-C 6 PEKERJAAN KUNCI & KACA

6.2 Memasang 1 buah Kunci Tanam Biasa Buah #VALUE!

6.3 Memasang 1 Buah Kunci Silinder Buah #VALUE!

6.4 Memasang 1 buah Kunci Slot untuk Kamar Mandi atau WC Buah #VALUE!

6.5 Memasang 1 buah Engsel Pintu Buah #VALUE!

6.6 Memasang 1 buah Engsel Angin untuk pintu Buah #VALUE!

6.7 Memasang 1 buah engsel pintu klam Buah #VALUE!

6.8 Memasang 1 buah engsel jendela Buah #VALUE!

6.9 Memasang 1 buah Kait Angin Buah #VALUE!

6.10 Memasang 1 buah Door Closer Buah #VALUE!

6.11 Memasang 1 buah door holder Buah #VALUE!

6.12 Memasang 1 buah Door Stop Buah #VALUE!

6.13 Memasang 1 buah Rel Pintu Dorong Buah #VALUE!

6.14 Memasang 1 buah Gerendel m2 #VALUE!

6.16 Memasang 1 m² Kaca tebal 3 mm m2 #VALUE!

6.17 Memasang 1 m² Kaca tebal 5 mm m2 #VALUE!

6.20 Memasang 1 m² Kaca Raiben (Cermin) tebal 5 mm m2 #VALUE!

XIII 7395:2008 6 PEKERJAAN PENUTUP LANTAI & DINDING

6.2 Memasang 1 m² lantai Ubin PC Abu-abu Ukuran (30 x 30) cm m2 44,200.00

6.3 Memasang 1 m² lantai Ubin PC Abu-abu Ukuran (20 x 20) cm m2 46,050.00

6.5 Memasang 1 m² lantai Ubin Warna Ukuran (30 x 30) cm m2 44,200.00

6.6 Memasang 1 m² lantai Ubin Warna Ukuran (20 x 20) cm m2 46,050.00

6.8 Memasang 1 m² lantai Ubin Traso Ukuran (30 x 30) cm m2 44,200.00

6.9 Memasang 1 m² lantai Ubin Granit Ukuran ( 40 x 40 ) cm m2 41,950.00

6.16 Memasang 1 m² Plint Ubin PC abu -abu Ukuran (15 x 20 ) cm m2 21,000.00

6.19 Memasang 1m¹ Plint Ubin PC Warna Ukuran (10 x 20) cm m' 21,000.00

6.34 Memasang 1 m² Lantai Keramik Ukuran (33 x 33) cm m2 119,000.00

6.35 Memasang 1 m² Lantai Keramik Ukuran (30 x 30) cm m2 119,000.00

6.36 Memasang 1 m² Lantai Keramik Ukuran (20 x 20) cm m2 119,000.00

6.43 Memasang 1 m² Lantai Marmer Ukuran (100x100) cm m2 119,000.00

6.44 Memasang 1 m² Lantai Karpet m2 39,600.00 6.54 Memasang 1 m² Dinding Keramik Ukuran (20x20) cm, m2 -

6.55 Memasang 1 m² Dinding Marmer Ukuran (100x100) cm m2 221,000.00

6.57 Memasang 1 m² Dinding Batu Paras / Batu Tempel Hitam m2 119,000.00

6.60 Memasang 1 m² Wall Paper Lebar 50 cm m2 57,100.00

6.63 Memasang 1 m¹ Plint Kayu Kamper Ukuran (2x10) cm m' 27,900.00

XIV 6 PEKERJAAN PENGECATAN 6.1 Mengikis / Mengerok 1 m² Permukaan Cat Tembok Lama m2 #VALUE!

6.2 Mencuci 1 m² Bidang Permukaan Tembok yang Pernah dicat m2 #VALUE!

6.3 Mengerok 1 m² Karat Cat Lama permukaan Baja dg cara manual m2 #VALUE!

6.4 Menyabun 1 m² Permukaan Tembok Lama m2 #VALUE!

6.6 Mendempul dan Menggosok 1 m² Kayu m2 #VALUE!

6.7 Pengecatan 1 m² Bidang Lama Kayu m2 #VALUE!

C235
User:
D235
User:
G235
User:
H235
User:
C236
User:
D236
User:
G236
User:
H236
User:
C248
User:
D248
User:
G248
User:
H248
User:
G249
User:
C272
User:
D272
User:
G272
User:
H272
User:
C274
User:
D274
User:
G274
User:
H274
User:
H275
User:
Page 18: Analis Cipta Karya 2012-8 FEB 2012

Page 18 sat.pekerjaan

HARGA SATUAN

NO. SNI KODE URAIAN PEKERJAAN SAT PEKERJAAN

(Rp)

6.8 Pengecatan 1 m² Bidang Kayu Baru (1 lap.Plamir) 1 lap.Cat Dasar & 2 lap.Cat Penutup m2 #VALUE! 6.9 Pengecatan 1 m² Bidang Kayu Baru (1 lap.Plamir) 1 lap.Cat Dasar & 3 lap.Cat Penutup m2 #VALUE!

6.10 Pelaburan 1 m² Bidang Kayu dg Teak Oil m2 #VALUE! 6.11 Pelaburan 1 m² Bidang Kayu dg Politur m2 #VALUE! 6.12 Pelaburan 1 m² Bidang Kayu dg Cat Residu & Ter m2 #VALUE! 6.13 Pelaburan 1 m² Bidang Kayu dg Vernis m2 #VALUE! 6.14 Pengecatan 1 m² Tembok Baru (1lap.Plamir, 1lap Cat Dasar 2 lap. Cat Penutup) m2 #VALUE! 6.15 Pengecatan 1 m² Tembok Lama (1lap.Plamir, 2lap Cat Penutup) m2 #VALUE!

6.20 Pengecatan 1 m² Permukaan Baja dg Meni Besi m2 #VALUE! 6.21 Pengecatan 1 m² Permukaan Baja dg Meni Besi & Perancah m2 #VALUE!

XV PEKERJAAN PAVING

G.55.b.1 Pasang Paving Tebal 6 cm (K.200) (Type Holland) m² 73,885.52

G.55.b.2 Pasang Paving Tebal 6 cm (K.250) (Type Holland) m² 70,771.66

G.55.b.3 Pasang Paving Tebal 6 cm (K.300) (Type Holland) m² 73,852.16

G.55.b.4 Pasang Paving Tebal 6 cm (K.400) (Type Holland) m² 77,939.16

G.55.c.1 Pasang Paving Tebal 8 cm (K.250) (Type Holland) m² 92,039.00

G.55.c.2 Pasang Paving Tebal 8 cm (K.300) (Type Holland) m² 98,535.50

G.55.c.3 Pasang Paving Tebal 8 cm (K.400) (Type Holland) m² 105,672.50

G.55.d.1 Pasang Paving Segitiga Kecil Tebal 6 cm (K.300) m² 77,451.16

G.55.d.2 Pasang Paving Segitiga Besar Tebal 6 cm (K.300) m² 78,832.50

G.55.e.1 Pasang Paving Segitiga Besar Tebal 8 cm (K.300) m² 105,581.00

Dihit I Pasang Kanstin Ukuran 13/16 x 28 x 50 K.200 ( Kanan + Kiri ) m #VALUE!

Dihit II Pasang Kanstin Ukuran 10 x 20 x 50 K.200 (Kanan + Kiri) m #VALUE!

Purwodadi, Desember 2011

: ………………………. Kepala Dinas

Sekretaris Dinas Cipta Karya Tata Ruang dan Kebersihan

NIP.19611023 198608 1 001 Kabupaten Grobogan

: ……………………….

Kepala Bidang Perumahan dan Permukiman

NIP.19690911 199603 1 002 Ir. Muchamad Chanif, MT

NIP.19611007 199003 1 004

: ……………………….

Kepala Bidang Tata Ruang

NIP.19720503 199703 1 006

: ……………………….

Kepala Bidang Kebersihan

NIP.19590727 199203 1 004

: ………………………. Kepala Bidang Pertamanan dan PJU NIP.19660627 199303 1 009

Diperiksa oleh :

1. Aditya Wahyu Wardhana, SH, MM

2. Aris Munandar, ST, MT

3. Joni Sarjono, ST

4. Ir Ahmad Wahib Suyuti

5. Ir. Budi Prihantoro, Msi

C286
User:
D286
User:
G286
User:
H286
User:
C325
User:
D325
User:
G325
User:
H325
User:
G327
User:
H327
User:
H328
User:
G329
User:
G331
User:
G332
User:
G333
User:
G334
User:
Page 19: Analis Cipta Karya 2012-8 FEB 2012

Page 19 ABK

DAFTAR ANALISA PEKERJAAN TAHUN 2012

SUMBER DATA : Pasaran BebasDAERAH : Kabupaten MimikaJENIS PEKERJAAN : I. Pekerjaan Persiapan Untuk Konstruksi Bangunan Gedung dan Perumahan

HARGA (Rp) JUMLAH (Rp) No. RSNI INDEKS SAT. URAIAN PEKERJAAN BAHAN UPAH BAHAN UPAH

1 2 4 5 6 7 8

I T-12-2002 PEKERJAAN PERSIAPAN

Membuat 1 m Pagar Sementara dari Seng Gelombang Tinggi 2,00 m 705,477.11 68,000.00

1.250 Btg Dolken Bambu 19,977.50 24,971.88 - 2.500 Kg Portland Semen (PC) 1,700.00 4,250.00 - 1.200 Lbr Seng Gelombang 3" - 5" 68,930.00 82,716.00 - 0.005 m3 Pasir Beton 450,000.00 2,250.00 - 0.009 m3 Koral Beton 2 x 3 1,000,000.00 9,000.00 - 0.072 m3 Kayu 5/7X4m Kayu Kruing 7,938,486.90 571,571.06 - 0.060 Kg Paku Biasa 2" - 5" 15,600.00 936.00 - 0.450 Kg Meni Besi 21,738.18 9,782.18 - 0.200 OH Tukang Kayu 110,000.00 - 22,000.00 0.400 OH Pekerja 100,000.00 - 40,000.00 0.020 OH Kepala Tukang 150,000.00 - 3,000.00 0.020 OH Mandor 150,000.00 - 3,000.00

Mengukur dan Memasang 1 m Bouwplank 142,745.41 23,250.00

Bahan - 0.012 m3 Kayu 5/7x 4m Kayu Kruing 7,238,666.67 86,864.00 - 0.020 Kg Paku Biasa 2" - 5" 15,600.00 312.00 - 0.007 m3 Kayu Papan 3/20 Kruing 7,938,486.90 55,569.41 -

- - Tenaga - -

0.100 OH Tukang Kayu 110,000.00 - 11,000.00 0.100 OH Pekerja 100,000.00 - 10,000.00 0.010 OH Kepala Tukang 150,000.00 - 1,500.00 0.005 OH Mandor 150,000.00 - 750.00

Membuat 1m2 Kantor Sementara dg Lantai Plesteran 1,299,689.34 582,500.00

1.250 Btg Dolken Bambu 19,977.50 24,971.88 - 0.180 m3 Kayu Lanan / Begesting 4,544,500.00 818,010.00 - 0.850 Kg Paku Biasa 2" - 5" 15,600.00 13,260.00 - 1.100 Kg Besi Strip 7,030.71 7,733.78 - 35.000 Kg Portalnd Semen (PC) 1,700.00 59,500.00 - 0.150 m3 Pasir pasang (PP) 350,000.00 52,500.00 - 0.100 m3 Pasir Beton 450,000.00 45,000.00 - 0.150 m3 Koral Beton 2 x3 1,000,000.00 150,000.00 - 30.000 buah Batu bata Merah 2,100.00 63,000.00 - 0.250 Lbr Seng Plat 17,995.00 4,498.75 - 2.000 buah Jendela Naco 18,910.00 37,820.00 - 0.080 m2 Kaca Polos 3 mm 61,732.00 4,938.56 - 0.150 buah Kunci Tanam 1 slag 67,100.00 10,065.00 - 0.300 buah Engsel 6,987.27 2,096.18 -

0.060 Lbr Plywood 4 mm 104,920.00 6,295.20 - 2.000 OH Tukang Kayu 110,000.00 - 220,000.00 1.000 OH Tukang Batu 110,000.00 - 110,000.00 2.000 OH Pekerja 100,000.00 - 200,000.00 0.300 OH Kepala Tukang 150,000.00 - 45,000.00 0.050 OH Mandor 150,000.00 - 7,500.00

1m2 PEMBUATAN DIREKSI KEET / KONSTRUKSI KAYU 91,703.13 297,500.00

Bahan - 0.060 m3 Balok Kayu Matoa 5/10 19,977.50 1,198.65 - 0.276 m3 Kayu Matoa 61,813.33 17,060.48 - 0.700 kg Paku campur 104,920.00 73,444.00 -

Page 20: Analis Cipta Karya 2012-8 FEB 2012

Page 20 ABK

1.500 lbr Seng Gelombang Bjls 30 - - - - -

Tenaga - - 1.000 o/h Pekerja 110,000.00 - 110,000.00 1.500 o/h Tukang 110,000.00 - 165,000.00 0.150 o/h Kepala Tukang 100,000.00 - 15,000.00 0.050 o/h Mandor 150,000.00 - 7,500.00

Membuat 1m2 Gudang Semen dan Alat-alat 1,177,731.75 357,500.00 1.700 Btg Dolken Bambu 19,977.50 33,961.75 - 0.210 m3 Kayu Lanan 4,544,500.00 954,345.00 - 0.300 Kg Paku Biasa 2" - 5" 15,600.00 4,680.00 - 10.500 Kg Portalnd Semen (PC) 1,700.00 17,850.00 - 0.030 m3 Pasir Beton 450,000.00 13,500.00 - 0.050 m3 Koral Beton 2 x3 1,000,000.00 50,000.00 - 1.500 Lbr Seng Gelombang BJLS 32 68,930.00 103,395.00 - 2.000 OH Tukang Kayu 110,000.00 - 220,000.00 1.000 OH Pekerja 100,000.00 - 100,000.00 0.200 OH Kepala Tukang 150,000.00 - 30,000.00 0.050 OH Mandor 150,000.00 - 7,500.00

Membersihkan 1 m2 Lapangan dan Perataan - 17,500.00 0.100 OH Pekerja 100,000.00 - 10,000.00 0.050 OH Mandor 150,000.00 - 7,500.00

Membuat 1m2 Steger dari Bambu Uk. 40 x 50 x 20 cm 965.83 44,195.00 1.000 Btg Bambu diameter 6 - 8 / 600 cm - - - 0.250 Kg Tali Ijuk 3,863.33 965.83 - 0.170 OH Tukang Kayu 110,000.00 - 18,700.00 0.250 OH Pekerja 100,000.00 - 25,000.00 0.002 OH Kepala Tukang 150,000.00 - 300.00 0.001 OH Mandor 150,000.00 - 195.00

Membongkar 1m3 Beton Bertulang - 1,388,300.00 6.667 OH Pekerja 100,000.00 - 666,700.00 0.333 OH Mandor 150,000.00 - 49,950.00

Membongkar 1 m3 Dinding Tembok Bata Merah - 671,650.00 6.667 OH Pekerja 100,000.00 - 666,700.00 0.033 OH Mandor 150,000.00 - 4,950.00

II 2835:2008 PEKERJAAN TANAH

- 78,750.00 0.750 OH Pekerja 100,000.00 - 75,000.00 0.025 OH Mandor 150,000.00 - 3,750.00

- 96,750.00 0.900 OH Pekerja 100,000.00 - 90,000.00 0.045 OH Mandor 150,000.00 - 6,750.00

- 115,050.00 1.050 OH Pekerja 100,000.00 - 105,000.00 0.067 OH Mandor 150,000.00 - 10,050.00

Menggali 1m³ Tanah Keras Sedalam 1 m - 104,800.00 1.000 OH Pekerja 100,000.00 - 100,000.00 0.032 OH Mandor 150,000.00 - 4,800.00

Menggali 1m³ Tanah Cadas Sedalam 1 m - 159,000.00 1.500 OH Pekerja 100,000.00 - 150,000.00 0.060 OH Mandor 150,000.00 - 9,000.00

Menggali 1m³ Tanah Lumpur Sedalam 1 m - 126,750.00 1.200 OH Pekerja 100,000.00 - 120,000.00 0.045 OH Mandor 150,000.00 - 6,750.00

- 5,750.00 0.050 OH Pekerja 100,000.00 - 5,000.00 0.005 OH Mandor 150,000.00 - 750.00

Menggali 1m³ Tanah Biasa Sedalam 1 m

Menggali 1m³ Tanah Biasa Sedalam 2 m

Menggali 1m³ Tanah Biasa Sedalam 3 m

Mengerjakan 1m² Striping Tebing Setinggi 1 m

Page 21: Analis Cipta Karya 2012-8 FEB 2012

Page 21 ABK

Membuang 1m³ Tanah sejauh 15 m' - 34,500.00 0.330 OH Pekerja 100,000.00 - 33,000.00 0.010 OH Mandor 150,000.00 - 1,500.00

Mengurug Kembali 1m³ galian (dihitung 1/3 kali indeks pekerjaan galian)

Memadatkan 1m³ Tanah (per 20 cm) - 57,500.00 0.500 OH Pekerja 100,000.00 - 50,000.00 0.050 OH Mandor 150,000.00 - 7,500.00

Mengurug 1m³ Pasir Urug 270,000.00 31,500.00 1.200 m³ Pasir Urug 225,000.00 270,000.00 - 0.300 OH Pekerja 100,000.00 - 30,000.00 0.010 OH Mandor 150,000.00 - 1,500.00

Mengurug 1m³ Tanah Padas 87,600.00 31,500.00 1.200 m³ Tanah Padas 73,000.00 87,600.00 - 0.300 OH Pekerja 100,000.00 - 30,000.00 0.010 OH Mandor 150,000.00 - 1,500.00

Memasang 1m³ Lapisan Pudel Cmp. 1KP : 3PP : 7TL 237,614.75 142,000.00 0.400 m³ Pasir Pasang (PP) 350,000.00 140,000.00 - 0.135 m³ Kapur Padam (KP) 210,450.00 28,410.75 - 0.948 m³ Tanah Liat 73,000.00 69,204.00 - 0.800 OH Pekerja 100,000.00 - 80,000.00 0.400 OH Tukang Batu 110,000.00 - 44,000.00 0.040 OH Kepala Tukang 150,000.00 - 6,000.00 0.080 OH Mandor 150,000.00 - 12,000.00

23,180.00 17,250.00 6.000 kg Ijuk 3,863.33 23,180.00 - 0.150 OH Pekerja 100,000.00 - 15,000.00 0.015 OH Mandor 150,000.00 - 2,250.00

Mengurug 1m³ Sirtu Padat untuk Peninggian Lantai Bangunan 270,000.00 28,750.00 1.200 m³ Sirtu 225,000.00 270,000.00 - 0.250 OH Pekerja 100,000.00 - 25,000.00 0.025 OH Mandor 150,000.00 - 3,750.00

Mengurug 1m³ Tanah Padas untuk Peninggian Lantai Bangunan 87,600.00 28,750.00 1.200 m³ Tanah Padas 73,000.00 87,600.00 - 0.250 OH Pekerja 100,000.00 - 25,000.00 0.025 OH Mandor 150,000.00 - 3,750.00

III 2836:2008 PEKERJAAN PONDASI

Memasang 1m³ Pondasi Batu Belah, Campuran 1PC : 3 PP 1,263,150.00 255,000.00 1.200 m³ Batu Belah Putih 15/20 625,000.00 750,000.00 - 202.000 Kg Portland Cement (PC) 1,700.00 343,400.00 - 0.485 m3 Pasir Pasang (PP) 350,000.00 169,750.00 - 1.500 OH Pekerja 100,000.00 - 150,000.00 0.750 OH Tukang Batu 110,000.00 - 82,500.00 0.075 OH Kepala Tukang 150,000.00 - 11,250.00 0.075 OH Mandor 150,000.00 - 11,250.00

Memasang 1m³ Pondasi Batu Belah, Campuran 1PC : 4 PP 1,209,100.00 255,000.00 1.200 m³ Batu Belah Putih 15/20 625,000.00 750,000.00 - 163.000 Kg Portland Cement (PC) 1,700.00 277,100.00 - 0.520 m3 Pasir Pasang (PP) 350,000.00 182,000.00 - 1.500 OH Pekerja 100,000.00 - 150,000.00 0.750 OH Tukang Batu 110,000.00 - 82,500.00 0.075 OH Kepala Tukang 150,000.00 - 11,250.00 0.075 OH Mandor 150,000.00 - 11,250.00

Memasang 1m³ Pondasi Batu Belah, Campuran 1PC : 5 PP 1,171,600.00 255,000.00 1.200 m³ Batu Belah Putih 15/20 625,000.00 750,000.00 - 136.000 Kg Portland Cement (PC) 1,700.00 231,200.00 - 0.544 m³ Pasir Pasang (PP) 350,000.00 190,400.00 - 1.500 OH Pekerja 100,000.00 - 150,000.00 0.750 OH Tukang Batu 110,000.00 - 82,500.00 0.075 OH Kepala Tukang 150,000.00 - 11,250.00

Memasang 1m² Lapisan Ijuk tebal 10 cm untuk bidang Resapan

Page 22: Analis Cipta Karya 2012-8 FEB 2012

Page 22 ABK

0.075 OH Mandor 150,000.00 - 11,250.00

Memasang 1m³ Pondasi Batu Belah, Campuran 1Pc : 6 PP 1,145,250.00 255,000.00 1.200 m³ Batu Belah Putih 15/20 625,000.00 750,000.00 - 117.000 Kg Portland Cement (PC) 1,700.00 198,900.00 - 0.561 m³ Pasir Pasang (PP) 350,000.00 196,350.00 - 1.500 OH Pekerja 100,000.00 - 150,000.00 0.750 OH Tukang Batu 110,000.00 - 82,500.00 0.075 OH Kepala Tukang 150,000.00 - 11,250.00 0.075 OH Mandor 150,000.00 - 11,250.00

Memasang 1m³ Pondasi Batu Belah, Campuran 1PC : 8 PP 1,364,100.00 - 1.200 m³ Batu Belah Putih 15/20 625,000.00 750,000.00 - 91.000 Kg Portland Cement (PC) 1,700.00 154,700.00 - 0.584 m³ Pasir Pasang (PP) 350,000.00 204,400.00 - 1.500 OH Pekerja 100,000.00 150,000.00 - 0.750 OH Tukang Batu 110,000.00 82,500.00 - 0.075 OH Kepala Tukang 150,000.00 11,250.00 - 0.075 OH Mandor 150,000.00 11,250.00 -

Memasang 1m³ Pondasi Batu Belah, Campuran 1KP : 1SM : 2PP 907,092.47 255,000.00 1.200 m³ Batu Belah Putih 15/20 625,000.00 750,000.00 - 0.170 m³ Kapur Padam (KP) 210,450.00 35,776.50 - 0.170 Kg Semen Merah (SM) 13,623.33 2,315.97 - 0.340 m³ Pasir Pasang (PP) 350,000.00 119,000.00 - 1.500 OH Pekerja 100,000.00 - 150,000.00 0.750 OH Tukang Batu 110,000.00 - 82,500.00 0.075 OH Kepala Tukang 150,000.00 - 11,250.00 0.075 OH Mandor 150,000.00 - 11,250.00

Memasang 1m³ Pondasi Batu Belah, Campuran 1 Pc : 3 Kp : 10 PP 1,056,836.15 255,000.00 1.200 m³ Batu Belah Putih 15/20 625,000.00 750,000.00 - 61.000 kg Portland Cement (PC) 1,700.00 103,700.00 - 0.147 m³ Kapur Padam (KP) 210,450.00 30,936.15 - 0.492 m³ Pasir Pasang (PP) 350,000.00 172,200.00 - 1.500 OH Pekerja 100,000.00 - 150,000.00 0.750 OH Tukang Batu 110,000.00 - 82,500.00 0.075 OH Kepala Tukang 150,000.00 - 11,250.00 0.075 OH Mandor 150,000.00 - 11,250.00

Memasang 1m³ Pondasi Batu Belah, Campuran ¼ Pc : 1Kp : 4 PP 1,030,318.95 255,000.00 1.200 m³ Batu Belah Putih 15/20 625,000.00 750,000.00 - 41.000 kg Portland Cement (PC) 1,700.00 69,700.00 - 0.131 m³ Kapur Padam (KP) 210,450.00 27,568.95 - 0.523 m³ Pasir Pasang (PP) 350,000.00 183,050.00 - 1.500 OH Pekerja 100,000.00 - 150,000.00 0.750 OH Tukang Batu 110,000.00 - 82,500.00 0.075 OH Kepala Tukang 150,000.00 - 11,250.00 0.075 OH Mandor 150,000.00 - 11,250.00

Memasang 1m³ Pondasi Batu Kosong (Aanstamping) 3,265,063.18 566,100.00 1.200 m³ Batu Belah Putih 15/20 625,000.00 750,000.00 - 0.432 m³ Pasir Urug 225,000.00 97,200.00 - 0.780 OH Pekerja 100,000.00 - 78,000.00 0.390 OH Tukang Batu 110,000.00 - 42,900.00 0.039 OH Kepala Tukang 150,000.00 - 5,850.00 0.039 OH Mandor 150,000.00 - 5,850.00

Memasang 1m³ Pondasi Siklop, 60% Beton, Campuran 1PC : 2PB : 3KR & 40% Batu Belah 2,417,863.18 433,500.00 0.480 m³ Batu Belah Putih 15/20 625,000.00 300,000.00 - 194.000 Kg Portland Cement (PC) 1,700.00 329,800.00 - 0.312 m³ Pasir Beton 450,000.00 140,400.00 - 0.468 m³ Kerikil (KR) 2 X 3 1,000,000.00 468,000.00 - 126.000 Kg Besi Beton Polos 9,082.60 1,144,407.18 - 1.800 Kg Kawat Beton 19,586.67 35,256.00 - 3.400 OH Pekerja 100,000.00 - 340,000.00 0.850 OH Tukang Batu 110,000.00 - 93,500.00 0.085 OH Kepala Tukang 150,000.00 - 12,750.00 0.170 OH Mandor 150,000.00 - 25,500.00

Memasang 1m³ Pondasi Sumuran diameter 100 cm 1,219,450.00 357,850.00 0.450 m³ Batu Belah Putih 15/20 625,000.00 281,250.00 - 194.000 Kg Portland Cement (PC) 1,700.00 329,800.00 -

Page 23: Analis Cipta Karya 2012-8 FEB 2012

Page 23 ABK

0.312 m³ Pasir Beton 450,000.00 140,400.00 - 0.468 m³ Kerikil (KR) 2 X 3 1,000,000.00 468,000.00 - 2.400 OH Pekerja 100,000.00 - 240,000.00 0.800 OH Tukang Batu 110,000.00 - 88,000.00 0.080 OH Kepala Tukang 150,000.00 - 12,000.00 0.119 OH Mandor 150,000.00 - 17,850.00

VII 7394:2008 PEKERJAAN B E T O N

Membuat 1m³ Beton mutu f'c=9,8 Mpa (K125), slum (12±2)cm, w/c = 0,78 1,303,800.08 211,900.00 276.00 Kg Portland Cement (PC) 1,700.00 469,200.00 - 828.00 kg Pasir Beton (PB) 321.43 266,142.86 - 1,012.00 kg Kerikil (KR) 2/3 555.56 562,222.22 - 215.00 ltr Air 29.00 6,235.00 - 1.65 OH Pekerja 100,000.00 - 165,000.00 0.28 OH Tukang Batu 110,000.00 - 30,250.00 0.03 OH Kepala Tukang 150,000.00 - 4,200.00 0.08 OH Mandor 150,000.00 - 12,450.00

Membuat 1m³ Beton mutu f'c=12,2 Mpa (K150), slum (12±2)cm, w/c = 0,78 1,336,356.43 211,900.00 299.00 Kg Portland Cement (PC) 1,700.00 508,300.00 - 799.00 kg Pasir Beton (PB) 321.43 256,821.43 - 1,017.00 kg Kerikil (KR) 2/3 555.56 565,000.00 - 215.00 ltr Air 29.00 6,235.00 - 1.65 OH Pekerja 100,000.00 - 165,000.00 0.28 OH Tukang Batu 110,000.00 - 30,250.00 0.03 OH Kepala Tukang 150,000.00 - 4,200.00 0.08 OH Mandor 150,000.00 - 12,450.00

Membuat 1m³ Beton mutu f'c=7,4 MPa (K100), slum (12±2)cm, w/c = 0,78 634,951.85 145,900.00 230.00 Kg Portland Cement (PC) 1,497.00 344,310.77 - 893.00 kg Pasir Beton (PB) 162.79 145,371.59 - 1,027.00 kg Kerikil (KR) 2/3 135.80 139,469.49 - 200.00 ltr Air 29.00 5,800.00 - 1.20 OH Pekerja 100,000.00 - 120,000.00 0.20 OH Tukang Batu 110,000.00 - 22,000.00 0.02 OH Kepala Tukang 150,000.00 - 3,000.00 0.01 OH Mandor 150,000.00 - 900.00

Membuat 1m³ Beton mutu f'c=14,5 MPa (K175), slum (12±2)cm, w/c = 0,66 757,719.69 208,250.00 326.00 Kg Portland Cement (PC) 1,497.00 488,023.09 - 760.00 Kg Pasir Beton (PB) 162.79 123,720.50 - 1,029.00 Kg Kerikil (KR) 2/3 135.80 139,741.10 - 215.00 ltr Air 29.00 6,235.00 - 1.65 OH Pekerja 100,000.00 - 165,000.00 0.25 OH Tukang Batu 110,000.00 - 27,500.00 0.03 OH Kepala Tukang 150,000.00 - 3,750.00 0.08 OH Mandor 150,000.00 - 12,000.00

- -

Membuat 1m³ Beton mutu f'c=16,9 MPa (K200), slum (12±2)cm, w/c = 0,61 1,434,976.06 208,250.00 352.00 Kg Portland Cement (PC) 1,497.00 526,945.17 - 731.00 Kg Pasir Beton (PB) 162.79 118,999.59 - 1,031.00 Kg Kerikil (KR) 1/2 759.26 782,796.30 - 215.00 ltr Air 29.00 6,235.00 - 1.65 OH Pekerja 100,000.00 - 165,000.00 0.25 OH Tukang Batu 110,000.00 - 27,500.00 0.03 OH Kepala Tukang 150,000.00 - 3,750.00 0.08 OH Mandor 150,000.00 - 12,000.00

Membuat 1m³ Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 1,470,195.20 208,250.00 371.00 Kg Portland Cement (PC) 1,497.00 555,388.24 - 698.00 Kg Pasir Beton (PB) 162.79 113,627.51 - 1,047.00 Kg Kerikil (KR) 1/2 759.26 794,944.44 - 215.00 ltr Air 29.00 6,235.00 - 1.65 OH Pekerja 100,000.00 - 165,000.00 0.25 OH Tukang Batu 110,000.00 - 27,500.00 0.03 OH Kepala Tukang 150,000.00 - 3,750.00 0.08 OH Mandor 150,000.00 - 12,000.00

Membuat 1m³ Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 1,482,605.42 208,250.00

Page 24: Analis Cipta Karya 2012-8 FEB 2012

Page 24 ABK

384.00 Kg Portland Cement (PC) 1,497.00 574,849.28 - 692.00 Kg Pasir Beton (PB) 162.79 112,650.77 - 1,039.00 Kg Kerikil (KR) 1/2 759.26 788,870.37 - 215.00 ltr Air 29.00 6,235.00 - 1.65 OH Pekerja 100,000.00 - 165,000.00 0.25 OH Tukang Batu 110,000.00 - 27,500.00 0.03 OH Kepala Tukang 150,000.00 - 3,750.00 0.08 OH Mandor 150,000.00 - 12,000.00

Membuat 1m³ Beton mutu f'c=24,0 MPa (K275), slum (12±2)cm, w/c = 0,53 1,504,366.81 208,250.00 406.00 Kg Portland Cement (PC) 1,497.00 607,783.35 - 684.00 kg Pasir Beton (PB) 162.79 111,348.45 - 1,026.00 kg Kerikil (KR) 1/2 759.26 779,000.00 - 215.00 ltr Air 29.00 6,235.00 - 1.65 OH Pekerja 100,000.00 - 165,000.00 0.25 OH Tukang Batu 110,000.00 - 27,500.00 0.03 OH Kepala Tukang 150,000.00 - 3,750.00 0.08 OH Mandor 150,000.00 - 12,000.00

Membuat 1m³ Beton mutu f'c=26,4 MPa (K300), slum (12±2)cm, w/c = 0,52 1,510,561.16 208,250.00 413.00 Kg Portland Cement (PC) 1,497.00 618,262.38 - 681.00 Kg Pasir Beton (PB) 162.79 110,860.08 - 1,021.00 Kg Kerikil (KR) 1/2 759.26 775,203.70 - 215.00 ltr Air 29.00 6,235.00 - 1.65 OH Pekerja 100,000.00 - 165,000.00 0.25 OH Tukang Batu 110,000.00 - 27,500.00 0.03 OH Kepala Tukang 150,000.00 - 3,750.00 0.08 OH Mandor 150,000.00 - 12,000.00

Membuat 1m³ Beton mutu f'c=28,8 MPa (K325), slum (12±2)cm, w/c = 0,49 1,536,303.67 269,500.00 439.00 Kg Portland Cement (PC) 1,497.00 657,184.46 - 670.00 Kg Pasir Beton (PB) 162.79 109,069.39 - 1,006.00 Kg Kerikil (KR) 1/2 759.26 763,814.81 - 215.00 ltr Air 29.00 6,235.00 - 2.10 OH Pekerja 100,000.00 - 210,000.00 0.35 OH Tukang Batu 110,000.00 - 38,500.00 0.04 OH Kepala Tukang 150,000.00 - 5,250.00 0.11 OH Mandor 150,000.00 - 15,750.00

Membuat 1m³ Beton mutu f'c=31,2 MPa (K350), slum (12±2)cm, w/c = 0,48 1,544,732.77 269,500.00 448.00 Kg Portland Cement (PC) 1,497.00 670,657.49 - 667.00 Kg Pasir Beton (PB) 162.79 108,581.02 - 1,000.00 Kg Kerikil (KR) 1/2 759.26 759,259.26 - 215.00 ltr Air 29.00 6,235.00 - 2.10 OH Pekerja 100,000.00 - 210,000.00 0.35 OH Tukang Batu 110,000.00 - 38,500.00 0.04 OH Kepala Tukang 150,000.00 - 5,250.00 0.11 OH Mandor 150,000.00 - 15,750.00

Pembesian 1 Kg dengan Besi Ulir 772,347.13 91,895.00 1.05 Kg Besi Beton (ulir) 9,941.34 10,438.41 - 0.02 Kg Kawat Beton 19,586.67 293.80 - 0.01 OH Pekerja 100,000.00 - 700.00 0.01 OH Tukang Besi 110,000.00 - 770.00 0.00 OH Kepala Tukang 150,000.00 - 105.00 0.00 OH Mandor 150,000.00 - 60.00

Memasang 1 Kg Kabel Presstresed Polos/strands 761,614.93 90,260.00 1.05 Kg Besi Beton (polos) 9,082.60 9,536.73 - 0.01 Kg Kawat Beton 19,586.67 195.87 - 0.01 OH Pekerja 100,000.00 - 500.00 0.01 OH Tukang Besi 110,000.00 - 550.00 0.00 OH Kepala Tukang 150,000.00 - 75.00 0.00 OH Mandor 150,000.00 - 45.00

Memasang 1 Kg Jaring Kawat baja/Wire Mesh 751,882.33 89,090.00 1.02 Kg Jaring Kawat Baja dilas 701,500.00 715,530.00 - 0.01 Kg Kawat Beton 19,586.67 97.93 - 0.00 OH Pekerja 100,000.00 - 25.00 0.00 OH Tukang Besi 110,000.00 - 275.00 0.00 OH Kepala Tukang 150,000.00 - 375.00

Page 25: Analis Cipta Karya 2012-8 FEB 2012

Page 25 ABK

0.00 OH Mandor 150,000.00 - 15.00

Memasang 1 m² Bekisting untuk Pondasi 36,254.40 88,400.00 0.04 m3 Kayu Klas III ( Kayu Cetakan / Sengon) 686,860.00 27,474.40 - 0.30 Kg Paku Biasa 2" - 5" 15,600.00 4,680.00 - 0.10 Ltr Minyak Bekisting 41,000.00 4,100.00 - 0.52 OH Pekerja 100,000.00 - 52,000.00 0.26 OH Tukang Kayu 110,000.00 - 28,600.00 0.03 OH Kepala Tukang 150,000.00 - 3,900.00 0.03 OH Mandor 150,000.00 - 3,900.00

-

Memasang 1 m² Bekisting untuk Sloof 39,688.70 88,400.00 0.05 m3 Kayu Klas III ( Kayu Cetakan / Sengon) 686,860.00 30,908.70 - 0.30 Kg Paku Biasa 2" - 5" 15,600.00 4,680.00 - 0.10 Ltr Minyak Bekisting 41,000.00 4,100.00 - 0.52 OH Pekerja 100,000.00 - 52,000.00 0.26 OH Tukang Kayu 110,000.00 - 28,600.00 0.03 OH Kepala Tukang 150,000.00 - 3,900.00 0.03 OH Mandor 150,000.00 - 3,900.00

Memasang 1 m² Bekisting untuk Kolom 267,614.40 112,200.00 0.04 m3 Kayu Klas III ( Kayu Cetakan / Sengon) 686,860.00 27,474.40 - 0.40 Kg Paku Biasa 2" - 5" 15,600.00 6,240.00 - 0.20 Ltr Minyak Bekisting 41,000.00 8,200.00 - 0.02 m3 Balok Kayu Kamper 8,540,000.00 128,100.00 - 0.35 Lbr Plywood tebal 9 mm 164,700.00 57,645.00 - 2.00 Btg Dolken Bambu 19,977.50 39,955.00 - 0.66 OH Pekerja 100,000.00 - 66,000.00 0.33 OH Tukang Kayu 110,000.00 - 36,300.00 0.03 OH Kepala Tukang 150,000.00 - 4,950.00 0.03 OH Mandor 150,000.00 - 4,950.00

1.00 m2 Memasang 1 m² Bekisting untuk Balok 293,234.40 112,200.00 0.04 m3 Kayu Klas III ( Kayu Cetakan / Sengon) 686,860.00 27,474.40 - 0.40 Kg Paku Biasa 2" - 5" 15,600.00 6,240.00 - 0.20 Ltr Minyak Bekisting 41,000.00 8,200.00 - 0.02 m3 Balok Kayu Kamper 8,540,000.00 153,720.00 - 0.35 Lbr Plywood tebal 9mm 164,700.00 57,645.00 - 2.00 Btg Dolken Bambu 19,977.50 39,955.00 - 0.66 OH Pekerja 100,000.00 - 66,000.00 0.33 OH Tukang Kayu 110,000.00 - 36,300.00 0.03 OH Kepala Tukang 150,000.00 - 4,950.00 0.03 OH Mandor 150,000.00 - 4,950.00

-

Memasang 1 m² Bekisting untuk Lantai 347,524.40 112,200.00 0.04 m3 Kayu Klas III ( Kayu Cetakan / Sengon) 686,860.00 27,474.40 - 0.40 Kg Paku Biasa 2" - 5" 15,600.00 6,240.00 - 0.20 Ltr Minyak Bekisting 41,000.00 8,200.00 - 0.02 m3 Balok Kayu Kamper 8,540,000.00 128,100.00 - 0.35 Lbr Plywood tebal 9mm 164,700.00 57,645.00 - 6.00 Btg Dolken Bambu 19,977.50 119,865.00 - 0.66 OH Pekerja 100,000.00 - 66,000.00 0.33 OH Tukang Kayu 110,000.00 - 36,300.00 0.03 OH Kepala Tukang 150,000.00 - 4,950.00 0.03 OH Mandor 150,000.00 - 4,950.00

Memasang 1 m² Bekisting untuk Dinding 347,423.30 112,200.00 0.03 m3 Kayu Klas III ( Kayu Cetakan / Sengon) 686,860.00 20,605.80 - 0.40 Kg Paku Biasa 2" - 5" 15,600.00 6,240.00 - 0.20 Ltr Minyak Bekisting 41,000.00 8,200.00 - 0.02 m3 Balok Kayu Kamper 8,540,000.00 170,800.00 - 0.35 Lbr Plywood tebal 9mm 164,700.00 57,645.00 - 3.00 Btg Dolken Bambu 19,977.50 59,932.50 - 4.00 Buah Formite/Penjaga jarak / Spacer (alat bantu) 6,000.00 24,000.00 - 0.66 OH Pekerja 100,000.00 - 66,000.00 0.33 OH Tukang Kayu 110,000.00 - 36,300.00 0.03 OH Kepala Tukang 150,000.00 - 4,950.00 0.03 OH Mandor 150,000.00 - 4,950.00

1.00 m2 Memasang 1 m² Bekisting untuk Tangga 258,695.80 112,200.00 0.03 m3 Kayu Klas III ( Kayu Cetakan / Sengon) 686,860.00 20,605.80 -

Page 26: Analis Cipta Karya 2012-8 FEB 2012

Page 26 ABK

0.40 Kg Paku Biasa 2" - 5" 15,600.00 6,240.00 - 0.15 Ltr Minyak Bekisting 41,000.00 6,150.00 - 0.02 m3 Balok Kayu Kamper 8,540,000.00 128,100.00 - 0.35 Lbr Plywood tebal 9mm 164,700.00 57,645.00 - 2.00 Btg Dolken Bambu 19,977.50 39,955.00 - 0.66 OH Pekerja 100,000.00 - 66,000.00 0.33 OH Tukang Kayu 110,000.00 - 36,300.00 0.03 OH Kepala Tukang 150,000.00 - 4,950.00 0.03 OH Mandor 150,000.00 - 4,950.00

Memasang 1 m² Jembatan Cor 37,481.85 22,450.00 0.03 m3 Kayu Terentang (Kayu Klas III ( Kayu Cetakan / S 686,860.00 18,133.10 - 0.60 kg Paku Biasa 2" - 5" 15,600.00 9,360.00 - 0.50 m3 Dolken Bambu 19,977.50 9,988.75 - 0.15 OH Pekerja 100,000.00 - 15,000.00 0.05 OH Tukang Kayu 110,000.00 - 5,500.00 0.01 OH Kepala Tukang 150,000.00 - 750.00 0.01 OH Mandor 150,000.00 - 1,200.00

Membuat 1 m³ Pondasi Beton Bertulang (150 kg Besi + Bekisting) 3,207,744.09 897,800.00 0.20 m3 Kayu Klas III ( Kayu Cetakan / Sengon) 686,860.00 137,372.00 - 1.50 Kg Paku Biasa 2" - 5" 15,600.00 23,400.00 - 0.40 Ltr Minyak Bekisting 41,000.00 16,400.00 - 157.50 Kg Besi Beton Polos 9,082.60 1,430,508.97 - 2.25 Kg Kawat Beton 19,586.67 44,070.00 - 336.00 Kg Portland Cement (PC) 1,497.00 502,993.12 - 0.54 m3 Pasir Beton (PB) 450,000.00 243,000.00 - 0.81 m3 Kerikil 2/3 1,000,000.00 810,000.00 - 5.30 OH Pekerja 100,000.00 - 530,000.00 0.28 OH Tukang batu 110,000.00 - 30,250.00 1.30 OH Tukang Kayu 110,000.00 - 143,000.00 1.05 OH Tukang Besi 110,000.00 - 115,500.00 0.26 OH Kepala Tukang 150,000.00 - 39,300.00 0.27 OH Mandor 150,000.00 - 39,750.00

Membuat 1 m³ Sloof Beton Bertulang (200 kg Besi + Bekisting) 3,763,350.62 1,011,750.00 0.27 m3 Kayu Klas III ( Kayu Cetakan / Sengon) 686,860.00 185,452.20 - 2.00 Kg Paku Biasa 2" - 5" 15,600.00 31,200.00 - 0.60 Ltr Minyak Bekisting 41,000.00 24,600.00 - 210.00 Kg Besi Beton Polos 9,082.60 1,907,345.30 - 3.00 Kg Kawat Beton 19,586.67 58,760.00 - 336.00 Kg Portland Cement (PC) 1,497.00 502,993.12 - 0.54 m3 Pasir Beton (PB) 450,000.00 243,000.00 - 0.81 m3 Kerikil 2/3 1,000,000.00 810,000.00 - 5.65 OH Pekerja 100,000.00 - 565,000.00 0.28 OH Tukang batu 110,000.00 - 30,250.00 1.56 OH Tukang Kayu 110,000.00 - 171,600.00 1.40 OH Tukang Besi 110,000.00 - 154,000.00 0.32 OH Kepala Tukang 150,000.00 - 48,450.00 0.28 OH Mandor 150,000.00 - 42,450.00

Membuat 1 m³ Kolom Beton Bertulang (300 kg Besi + Bekisting) 7,181,295.07 1,261,150.00 0.40 m3 Kayu Klas III ( Kayu Cetakan / Sengon) 686,860.00 274,744.00 - 4.00 Kg Paku Biasa 2" - 5" 15,600.00 62,400.00 - 2.00 Ltr Minyak Bekisting 41,000.00 82,000.00 - 315.00 kg Besi Beton Polos 9,082.60 2,861,017.95 - 4.50 kg Kawat Beton 19,586.67 88,140.00 - 336.00 Kg Portland Cement (PC) 1,497.00 502,993.12 - 0.54 m3 Pasir Beton (PB) 450,000.00 243,000.00 - 0.81 m3 Kerikil 2/3 1,000,000.00 810,000.00 - 0.15 m3 Balok Kayu Kamper 8,540,000.00 1,281,000.00 - 3.50 Lbr Plywood 9 mm 164,700.00 576,450.00 - 20.00 Btg Dolken Bambu 19,977.50 399,550.00 - 7.05 OH Pekerja 100,000.00 - 705,000.00 0.28 OH Tukang batu 110,000.00 - 30,250.00 1.65 OH Tukang Kayu 110,000.00 - 181,500.00 2.10 OH Tukang Besi 110,000.00 - 231,000.00 0.40 OH Kepala Tukang 150,000.00 - 60,450.00 0.35 OH Mandor 150,000.00 - 52,950.00

Membuat 1 m³ Balok Beton Bertulang (200 kg Besi + Bekisting) 5,833,813.62 1,098,400.00 0.32 m3 Kayu Klas III ( Kayu Cetakan / Sengon) 686,860.00 219,795.20 -

Page 27: Analis Cipta Karya 2012-8 FEB 2012

Page 27 ABK

3.20 Kg Paku Biasa 2" - 5" 15,600.00 49,920.00 - 1.60 Ltr Minyak Bekisting 41,000.00 65,600.00 - 210.00 Kg Besi Beton Polos 9,082.60 1,907,345.30 - 3.00 Kg Kawat Beton 19,586.67 58,760.00 - 336.00 Kg Portland Cement (PC) 1,497.00 502,993.12 - 0.54 m3 Pasir Beton (PB) 450,000.00 243,000.00 - 0.81 m3 Kerikil 2/3 1,000,000.00 810,000.00 - 0.14 m3 Balok Kayu Kamper 8,540,000.00 1,195,600.00 - 2.80 Lbr Plywood 9 mm 164,700.00 461,160.00 - 16.00 Btg Dolken Bambu 19,977.50 319,640.00 - 6.35 OH Pekerja 100,000.00 - 635,000.00 0.28 OH Tukang batu 110,000.00 - 30,250.00 1.65 OH Tukang Kayu 110,000.00 - 181,500.00 1.40 OH Tukang Besi 110,000.00 - 154,000.00 0.33 OH Kepala Tukang 150,000.00 - 49,950.00 0.32 OH Mandor 150,000.00 - 47,700.00

Membuat 1 m³ Plat Beton Bertulang (150 kg Besi + Bekisting) 5,491,127.30 898,250.00 0.32 m3 Kayu Klas III ( Kayu Cetakan / Sengon) 686,860.00 219,795.20 - 3.20 Kg Paku Biasa 2" - 5" 15,600.00 49,920.00 - 1.60 Ltr Minyak Bekisting 41,000.00 65,600.00 - 157.50 Kg Besi Beton Polos 9,082.60 1,430,508.97 - 2.25 Kg Kawat Beton 19,586.67 44,070.00 - 336.00 Kg Portland Cement (PC) 1,497.00 502,993.12 - 0.54 m3 Pasir Beton (PB) 450,000.00 243,000.00 - 0.81 m3 Kerikil 2/3 1,000,000.00 810,000.00 - 0.12 m3 Balok Kayu Kamper 8,540,000.00 1,024,800.00 - 2.80 Lbr Plywood 9 mm 164,700.00 461,160.00 - 32.00 Btg Dolken Bambu 19,977.50 639,280.00 - 5.30 OH Pekerja 100,000.00 - 530,000.00 0.28 OH Tukang batu 110,000.00 - 30,250.00 1.30 OH Tukang Kayu 110,000.00 - 143,000.00 1.05 OH Tukang Besi 110,000.00 - 115,500.00 0.27 OH Kepala Tukang 150,000.00 - 39,750.00 0.27 OH Mandor 150,000.00 - 39,750.00

Membuat 1 m³ Dinding Beton Bertulang (150 kg Besi + Bekisting) 5,617,958.50 897,800.00 0.24 m3 Kayu Klas III ( Kayu Cetakan / Sengon) 686,860.00 164,846.40 - 3.20 Kg Paku Biasa 2" - 5" 15,600.00 49,920.00 - 1.60 Ltr Minyak Bekisting 41,000.00 65,600.00 - 157.50 Kg Besi Beton Polos 9,082.60 1,430,508.97 - 2.25 Kg Kawat Beton 19,586.67 44,070.00 - 336.00 Kg Portland Cement (PC) 1,497.00 502,993.12 - 0.54 m3 Pasir Beton (PB) 450,000.00 243,000.00 - 0.81 m3 Kerikil 2/3 1,000,000.00 810,000.00 - 0.16 m3 Balok Kayu Kamper 8,540,000.00 1,366,400.00 - 2.80 Lbr Plywood 9 mm 164,700.00 461,160.00 - 24.00 Btg Dolken Bambu 19,977.50 479,460.00 - 5.30 OH Pekerja 100,000.00 - 530,000.00 0.28 OH Tukang batu 110,000.00 - 30,250.00 1.30 OH Tukang Kayu 110,000.00 - 143,000.00 1.05 OH Tukang Besi 110,000.00 - 115,500.00 0.26 OH Kepala Tukang 150,000.00 - 39,300.00 0.27 OH Mandor 150,000.00 - 39,750.00

Membuat 1 m³ Tangga Beton Bertulang (200 kg Besi + Bekisting) 5,377,948.42 1,011,750.00 0.25 m3 Kayu Klas III ( Kayu Cetakan / Sengon) 686,860.00 171,715.00 - 3.00 Kg Paku Biasa 2" - 5" 15,600.00 46,800.00 - 1.20 Ltr Minyak Bekisting 41,000.00 49,200.00 - 210.00 Kg Besi Beton Polos 9,082.60 1,907,345.30 - 3.00 Kg Kawat Beton 19,586.67 58,760.00 - 336.00 Kg Portland Cement (PC) 1,497.00 502,993.12 - 0.54 m3 Pasir Beton (PB) 450,000.00 243,000.00 - 0.81 m3 Kerikil 2/3 1,000,000.00 810,000.00 - 0.11 m3 Balok Kayu Kamper 8,540,000.00 896,700.00 - 2.50 Lbr Plywood 9 mm 164,700.00 411,750.00 - 14.00 Btg Dolken Bambu 19,977.50 279,685.00 - 5.65 OH Pekerja 100,000.00 - 565,000.00 0.28 OH Tukang batu 110,000.00 - 30,250.00 1.56 OH Tukang Kayu 110,000.00 - 171,600.00 1.40 OH Tukang Besi 110,000.00 - 154,000.00 0.32 OH Kepala Tukang 150,000.00 - 48,450.00

Page 28: Analis Cipta Karya 2012-8 FEB 2012

Page 28 ABK

0.28 OH Mandor 150,000.00 - 42,450.00

Membuat 1 m¹ Kolom Penguat Beton Bertulang (11 x 11) cm 47,346.92 26,850.00 0.00 m3 Kayu Klas III ( Kayu Cetakan / Sengon) 686,860.00 1,373.72 - 0.01 Kg Paku Biasa 2" - 5" 15,600.00 156.00 - 3.00 kg Besi Beton Polos 9,082.60 27,247.79 - 0.05 Kg Kawat Beton 19,586.67 881.40 - 4.00 Kg Portland Cement (PC) 1,497.00 5,988.01 - 0.01 m3 Pasir Beton (PB) 450,000.00 2,700.00 - 0.01 m3 Kerikil 2/3 1,000,000.00 9,000.00 - 0.18 OH Pekerja 100,000.00 - 18,000.00 0.02 OH Tukang batu 110,000.00 - 2,200.00 0.02 OH Tukang Kayu 110,000.00 - 2,200.00 0.02 OH Tukang Besi 110,000.00 - 2,200.00 0.01 OH Kepala Tukang 150,000.00 - 900.00 0.01 OH Mandor 150,000.00 - 1,350.00

Membuat 1 m¹ Ring Balok Beton Bertulang (10 x 15) cm 63,332.78 42,840.00 0.00 m3 Kayu Klas III ( Kayu Cetakan / Sengon) 686,860.00 2,060.58 - 0.02 Kg Paku Biasa 2" - 5" 15,600.00 312.00 - 3.60 kg Besi Beton Polos 9,082.60 32,697.35 - 0.05 Kg Kawat Beton 19,586.67 979.33 - 5.50 Kg Portland Cement (PC) 1,497.00 8,233.52 - 0.01 m3 Pasir Beton (PB) 450,000.00 4,050.00 - 0.02 m3 Kerikil 2/3 1,000,000.00 15,000.00 - 0.30 OH Pekerja 100,000.00 - 29,700.00 0.03 OH Tukang batu 110,000.00 - 3,630.00 0.03 OH Tukang Kayu 110,000.00 - 3,630.00 0.03 OH Tukang Besi 110,000.00 - 3,630.00 0.01 OH Kepala Tukang 150,000.00 - 1,500.00 0.01 OH Mandor 150,000.00 - 750.00

IV 6897:2008 P E K E R J A A N D I N D I N G

Memasang 1 m² Dinding Bata Merah ukuran (5x11x22) cm Tebal 1 Bata, Campuran Spesi 1PC : 2 395,950.00 89,500.00 140.000 Buah Bata Merah 2,100.00 294,000.00 - 43.500 Kg Portland Semen (PC #N/A 1,700.00 73,950.00 - 0.080 Pasir Pasang (PP) 350,000.00 28,000.00 - 0.600 OH Pekerja 100,000.00 - 60,000.00 0.200 OH Tukang Batu 110,000.00 - 22,000.00 0.020 OH Kepala Tukang Batu 150,000.00 - 3,000.00 0.030 OH Mandor 150,000.00 - 4,500.00

Memasang 1 m ² Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Campuran spesi 1PC : 3PP 381,865.00 89,500.00 140.000 Buah Bata Merah 2,100.00 294,000.00 - 32.950 Kg Portland Semen (PC) 1,700.00 56,015.00 - 0.091 m³ Pasir Pasang (PP) 350,000.00 31,850.00 - 0.600 OH Pekerja 100,000.00 - 60,000.00 0.200 OH Tukang Batu 110,000.00 - 22,000.00 0.020 OH Kepala Tukang Batu 150,000.00 - 3,000.00 0.030 OH Mandor 150,000.00 - 4,500.00

Memasang 1 m² Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Campuran Spesi 1PC : 4PP 371,685.00 89,500.00 140.000 Buah Bata Merah 2,100.00 294,000.00 - 26.550 Kg Portland Semen (PC) 1,700.00 45,135.00 - 0.093 m³ Pasir Pasang (PP) 350,000.00 32,550.00 - 0.600 OH Pekerja 100,000.00 - 60,000.00 0.200 OH Tukang Batu 110,000.00 - 22,000.00 0.020 OH Kepala Tukang Batu 150,000.00 - 3,000.00 0.030 OH Mandor 150,000.00 - 4,500.00

Memasang 1 m² Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Campuran Spesi 1PC : 5PP 367,440.00 89,500.00 140.000 Buah Bata Merah 2,100.00 294,000.00 - 22.200 Kg Portland Semen (PC) 1,700.00 37,740.00 - 0.102 m³ Pasir Pasang (PP) 350,000.00 35,700.00 - 0.600 OH Pekerja 100,000.00 - 60,000.00 0.200 OH Tukang Batu 110,000.00 - 22,000.00 0.020 OH Kepala Tukang Batu 150,000.00 - 3,000.00 0.030 OH Mandor 150,000.00 - 4,500.00

Memasang 1 m² Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Campuran Spesi 1PC : 6PP 368,150.00 89,500.00

Page 29: Analis Cipta Karya 2012-8 FEB 2012

Page 29 ABK

140.000 Buah Bata Merah 2,100.00 294,000.00 - 18.500 Kg Portland Semen (PC) 1,700.00 31,450.00 - 0.122 m³ Pasir Pasang (PP) 350,000.00 42,700.00 - 0.600 OH Pekerja 100,000.00 - 60,000.00 0.200 OH Tukang Batu 110,000.00 - 22,000.00 0.020 OH Kepala Tukang Batu 150,000.00 - 3,000.00 0.030 OH Mandor 150,000.00 - 4,500.00

Memasang 1 m² Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Campuran Spesi 1PC : 3 KP :10PP 349,298.38 85,000.00 140.000 Buah Bata Merah 2,100.00 294,000.00 - 10.080 Kg Portland Semen (PC) 1,700.00 17,136.00 - 0.0925 m³ Pasir Pasang (PP) 350,000.00 32,375.00 - 0.0275 m³ Kapur Padam (KP) 210,450.00 5,787.38 - 0.600 OH Pekerja 100,000.00 - 60,000.00 0.200 OH Tukang Batu 110,000.00 - 22,000.00 0.020 OH Kepala Tukang Batu 150,000.00 - 3,000.00 0.030 OH Mandor 150,000.00 - 4,500.00

Memasang 1 m² Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1/2 Bata Campuran Spesi 1PC : 2PP 187,212.10 44,750.00 70.000 Buah Bata Merah 2,100.00 147,000.00 - 18.950 Kg Pasir Pasang (PP) 1,700.00 32,215.00 - 0.038 m³ Kapur Padam (KP) 210,450.00 7,997.10 - 0.300 OH Pekerja 100,000.00 - 30,000.00 0.100 OH Tukang Batu 110,000.00 - 11,000.00 0.010 OH Kepala Tukang 150,000.00 - 1,500.00 0.015 OH Mandor 150,000.00 - 2,250.00

Memasang 1 m² Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1/2 Bata Campuran Spesi 1PC : 3PP 179,847.00 44,750.00 70.000 Buah Bata Merah 2,100.00 147,000.00 - 14.370 Kg Pasir Pasang (PP) 1,700.00 24,429.00 - 0.040 m³ Kapur Padam (KP) 210,450.00 8,418.00 - 0.300 OH Pekerja 100,000.00 - 30,000.00 0.100 OH Tukang Batu 110,000.00 - 11,000.00 0.010 OH Kepala Tukang 150,000.00 - 1,500.00 0.015 OH Mandor 150,000.00 - 2,250.00

Memasang 1m² Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1/2 Bata Campuran Spesi 1PC : 4PP 181,600.00 44,750.00 70.000 Buah Bata Merah 2,100.00 147,000.00 - 11.500 Kg Portland Semen (PC) 1,700.00 19,550.00 - 0.043 m³ Pasir Pasang (PP) 350,000.00 15,050.00 - 0.300 OH Pekerja 100,000.00 - 30,000.00 0.100 OH Tukang Batu 110,000.00 - 11,000.00 0.010 OH Kepala Tukang 150,000.00 - 1,500.00 0.015 OH Mandor 150,000.00 - 2,250.00

Memasang 1m² Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1/2 Bata Campuran Spesi 1PC : 5PP 179,206.00 44,750.00 70.000 Buah Bata Merah 2,100.00 147,000.00 - 9.680 Kg Portland Semen (PC) 1,700.00 16,456.00 - 0.045 m³ Pasir Pasang (PP) 350,000.00 15,750.00 - 0.300 OH Pekerja 100,000.00 - 30,000.00 0.100 OH Tukang Batu 110,000.00 - 11,000.00 0.010 OH Kepala Tukang 150,000.00 - 1,500.00 0.015 OH Mandor 150,000.00 - 2,250.00

Memasang 1m² Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1/2 Bata Campuran Spesi 1PC : 6PP 178,294.00 44,750.00 70.000 Buah Bata Merah 2,100.00 147,000.00 - 8.320 Kg Portland Semen (PC) 1,700.00 14,144.00 - 0.049 m³ Pasir Pasang (PP) 350,000.00 17,150.00 - 0.300 OH Pekerja 100,000.00 - 30,000.00 0.100 OH Tukang Batu 110,000.00 - 11,000.00 0.010 OH Kepala Tukang 150,000.00 - 1,500.00 0.015 OH Mandor 150,000.00 - 2,250.00

Memasang 1m² Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1/2 Bata Campuran Spesi 1PC : 8PP 175,550.00 44,750.00 70.000 Buah Bata Merah 2,100.00 147,000.00 - 6.500 Kg Portland Semen (PC) 1,700.00 11,050.00 - 0.050 m³ Pasir Pasang (PP) 350,000.00 17,500.00 - 0.300 OH Pekerja 100,000.00 - 30,000.00 0.100 OH Tukang Batu 110,000.00 - 11,000.00 0.010 OH Kepala Tukang 150,000.00 - 1,500.00 0.015 OH Mandor 150,000.00 - 2,250.00

Page 30: Analis Cipta Karya 2012-8 FEB 2012

Page 30 ABK

Memasang 1m² Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1/2 Bata Campuran Spesi 1PC : 3KP : 10PP 175,306.75 44,750.00 70.000 Buah Bata Merah 2,100.00 147,000.00 - 4.500 Kg Portland Semen (PC) 1,700.00 7,650.00 - 0.050 m³ Pasir Pasang (PP) 350,000.00 17,500.00 - 0.015 m³ Kapur Padam (KP) 210,450.00 3,156.75 - 0.300 OH Pekerja 100,000.00 - 30,000.00 0.100 OH Tukang Batu 110,000.00 - 11,000.00 0.010 OH Kepala Tukang 150,000.00 - 1,500.00 0.015 OH Mandor 150,000.00 - 2,250.00

V 2837:2008 PEKERJAAN P L E S T E R A N

31,956.80 51,000.00 15.504 Kg Portland Cement (PC) 1,700.00 26,356.80 - 0.016 Pasir Pasang (PP) 350,000.00 5,600.00 - 0.300 OH Pekerja 100,000.00 - 30,000.00 0.150 OH Tukang batu 110,000.00 - 16,500.00 0.015 OH Kepala Tukang 150,000.00 - 2,250.00 0.015 OH Mandor 150,000.00 - 2,250.00

Membuat 1 m² Plesteran 1 PC : 2 PP Tebal 15 mm 24,380.80 51,000.00 10.224 Kg Portland Cement (PC) 1,700.00 17,380.80 - 0.020 Pasir Pasang (PP) 350,000.00 7,000.00 - 0.300 OH Pekerja 100,000.00 - 30,000.00 0.150 OH Tukang batu 110,000.00 - 16,500.00 0.015 OH Kepala Tukang 150,000.00 - 2,250.00 0.015 OH Mandor 150,000.00 - 2,250.00

Membuat 1 m² Plesteran 1 PC : 3 PP Tebal 15 mm 21,269.20 51,000.00 7.776 Kg Portland Cement (PC) 1,700.00 13,219.20 - 0.023 Pasir Pasang (PP) 350,000.00 8,050.00 - 0.300 OH Pekerja 100,000.00 - 30,000.00 0.150 OH Tukang batu 110,000.00 - 16,500.00 0.015 OH Kepala Tukang 150,000.00 - 2,250.00 0.015 OH Mandor 150,000.00 - 2,250.00

Membuat 1 m² Plesteran 1 PC : 4 PP Tebal 15 mm 19,008.00 51,000.00 6.240 Kg Portland Cement (PC) 1,700.00 10,608.00 - 0.024 Pasir Pasang (PP) 350,000.00 8,400.00 - 0.300 OH Pekerja 100,000.00 - 30,000.00 0.150 OH Tukang batu 110,000.00 - 16,500.00 0.015 OH Kepala Tukang 150,000.00 - 2,250.00 0.015 OH Mandor 150,000.00 - 2,250.00

Membuat 1 m² Plesteran 1 PC : 5 PP Tebal 15 mm 17,912.80 51,000.00 5.184 Kg Portland Cement (PC) 1,700.00 8,812.80 - 0.026 Pasir Pasang (PP) 350,000.00 9,100.00 - 0.300 OH Pekerja 100,000.00 - 30,000.00 0.150 OH Tukang batu 110,000.00 - 16,500.00 0.015 OH Kepala Tukang 150,000.00 - 2,250.00 0.015 OH Mandor 150,000.00 - 2,250.00

Membuat 1 m² Plesteran 1 PC : 6 PP Tebal 15 mm 16,957.20 51,000.00 4.416 Kg Portland Cement (PC) 1,700.00 7,507.20 - 0.027 Pasir Pasang (PP) 350,000.00 9,450.00 - 0.300 OH Pekerja 100,000.00 - 30,000.00 0.150 OH Tukang batu 110,000.00 - 16,500.00 0.015 OH Kepala Tukang 150,000.00 - 2,250.00 0.015 OH Mandor 150,000.00 - 2,250.00

Membuat 1 m² Plesteran 1 PC : 7 PP Tebal 15 mm 16,491.20 51,000.00 3.936 Kg Portland Cement (PC) 1,700.00 6,691.20 - 0.028 Pasir Pasang (PP) 350,000.00 9,800.00 - 0.300 OH Pekerja 100,000.00 - 30,000.00 0.150 OH Tukang batu 110,000.00 - 16,500.00 0.015 OH Kepala Tukang 150,000.00 - 2,250.00 0.015 OH Mandor 150,000.00 - 2,250.00

Membuat 1 m² Plesteran 1 PC : 8 PP Tebal 15 mm 16,025.20 51,000.00 3.456 Kg Portland Cement (PC) 1,700.00 5,875.20 - 0.029 Pasir Pasang (PP) 350,000.00 10,150.00 -

Membuat 1 m² Plesteran 1 PC : 1 PP, Tebal 15 mm

Page 31: Analis Cipta Karya 2012-8 FEB 2012

Page 31 ABK

0.300 OH Pekerja 100,000.00 - 30,000.00 0.150 OH Tukang batu 110,000.00 - 16,500.00 0.015 OH Kepala Tukang 150,000.00 - 2,250.00 0.015 OH Mandor 150,000.00 - 2,250.00

Membuat 1 m² Plesteran 1 PC : 1/2 KP : 3 PP Tebal 15 mm 14,973.35 51,000.00 5.760 Kg Portland Cement (PC) 1,700.00 9,792.00 - 0.003 Kapur Padam (KP) 210,450.00 631.35 - 0.013 Pasir Pasang (PP) 350,000.00 4,550.00 - 0.360 OH Pekerja 100,000.00 - 36,000.00 0.120 OH Tukang batu 110,000.00 - 13,200.00 0.012 OH Kepala Tukang 150,000.00 - 1,800.00 0.018 OH Mandor 150,000.00 2,700.00

Membuat 1 m² Plesteran 1 PC : 2 KP : 8 PP Tebal 15 mm 13,152.25 51,000.00 3.000 kg Portland Cement (PC) 1,700.00 5,100.00 - 0.005 Kapur Padam (KP) 210,450.00 1,052.25 - 0.020 Pasir Pasang (PP) 350,000.00 7,000.00 - 0.360 OH Pekerja 100,000.00 - 36,000.00 0.120 OH Tukang batu 110,000.00 - 13,200.00 0.012 OH Kepala Tukang 150,000.00 - 1,800.00 0.018 OH Mandor 150,000.00 2,700.00

Membuat 1 m² Plesteran 1 SM : 1 KP : 1 PP Tebal 15 mm 5,156.55 51,000.00 0.009 Semen Merah (SM) 12,500.00 112.50 - 0.009 Kapur Padam (KP) 210,450.00 1,894.05 - 0.009 Pasir Pasang (PP) 350,000.00 3,150.00 - 0.360 OH Pekerja 100,000.00 - 36,000.00 0.120 OH Tukang batu 110,000.00 - 13,200.00 0.012 OH Kepala Tukang 150,000.00 - 1,800.00 0.018 OH Mandor 150,000.00 2,700.00

Membuat 1 m² Plesteran 1 SM : 1 KP : 2 PP Tebal 15 mm 6,810.65 51,000.00 0.007 Semen Merah (SM) 12,500.00 87.50 - 0.007 Kapur Padam (KP) 210,450.00 1,473.15 - 0.015 Pasir Pasang (PP) 350,000.00 5,250.00 - 0.360 OH Pekerja 100,000.00 - 36,000.00 0.120 OH Tukang batu 110,000.00 - 13,200.00 0.012 OH Kepala Tukang 150,000.00 - 1,800.00 0.018 OH Mandor 150,000.00 2,700.00

Membuat 1 m² Plesteran 1 PC : 2 PP Tebal 20 mm 32,624.40 68,300.00 13.632 kg Portland Cement (PC) 1,700.00 23,174.40 - 0.027 Pasir Pasang (PP) 350,000.00 9,450.00 - 0.400 OH Pekerja 100,000.00 - 40,000.00 0.200 OH Tukang batu 110,000.00 - 22,000.00 0.020 OH Kepala Tukang 150,000.00 - 3,000.00 0.022 OH Mandor 150,000.00 - 3,300.00

Membuat 1 m² Plesteran 1PC : 3PP Tebal 20 mm 28,475.60 68,300.00 10.368 Kg Portland Cement (PC) 1,700.00 17,625.60 - 0.031 Pasir Pasang (PP) 350,000.00 10,850.00 - 0.400 OH Pekerja 100,000.00 - 40,000.00 0.200 OH Tukang batu 110,000.00 - 22,000.00 0.020 OH Kepala Tukang 150,000.00 - 3,000.00 0.022 OH Mandor 150,000.00 - 3,300.00

Membuat 1 m² Plesteran 1 PC : 4 PP Tebal 20 mm 25,344.00 68,300.00 8.320 kg Portland Cement (PC) 1,700.00 14,144.00 - 0.032 Pasir Pasang (PP) 350,000.00 11,200.00 - 0.400 OH Pekerja 100,000.00 - 40,000.00 0.200 OH Tukang batu 110,000.00 - 22,000.00 0.020 OH Kepala Tukang 150,000.00 - 3,000.00 0.022 OH Mandor 150,000.00 - 3,300.00

Membuat 1 m² Plesteran 1PC : 5PP Tebal 20 mm 24,000.40 66,950.00 6.912 Kg Portland Cement (PC) 1,700.00 11,750.40 - 0.035 Pasir Pasang (PP) 350,000.00 12,250.00 - 0.400 OH Pekerja 100,000.00 - 40,000.00 0.200 OH Tukang batu 110,000.00 - 22,000.00 0.020 OH Kepala Tukang 150,000.00 - 3,000.00 0.013 OH Mandor 150,000.00 - 1,950.00

m³m³

m³m³

m³m³m³

m³m³m³

Page 32: Analis Cipta Karya 2012-8 FEB 2012

Page 32 ABK

Membuat 1 m² Plesteran 1PC : 6PP Tebal 20 mm 22,609.60 66,950.00 5.888 Kg Portland Cement (PC) 1,700.00 10,009.60 - 0.036 Pasir Pasang (PP) 350,000.00 12,600.00 - 0.400 OH Pekerja 100,000.00 - 40,000.00 0.200 OH Tukang batu 110,000.00 - 22,000.00 0.020 OH Kepala Tukang 150,000.00 - 3,000.00 0.013 OH Mandor 150,000.00 - 1,950.00

Membuat 1 m² Plesteran 1 SM : 2 KP : 2 PP Tebal 20 mm 8,306.55 71,500.00 0.009 Semen Merah (SM) 12,500.00 112.50 - 0.009 Kapur Padam (KP) 210,450.00 1,894.05 - 0.018 Pasir Pasang (PP) 350,000.00 6,300.00 - 0.440 OH Pekerja 100,000.00 - 44,000.00 0.220 OH Tukang batu 110,000.00 - 24,200.00 0.022 OH Kepala Tukang 150,000.00 - 3,300.00 0.022 OH Mandor 150,000.00 3,300.00

Membuat 1 m² Berapen 1 PC : 5 PP Tebal 15 mm 17,912.80 25,650.00 5.184 Kg Portland Cement (PC) 1,700.00 8,812.80 - 0.026 Pasir Pasang (PP) 350,000.00 9,100.00 - 0.150 OH Pekerja 100,000.00 - 15,000.00 0.075 OH Tukang batu 110,000.00 - 8,250.00 0.008 OH Kepala Tukang 150,000.00 - 1,200.00 0.008 OH Mandor 150,000.00 - 1,200.00

5,400.00 58,600.00 0.500 Kg Portland Cement (PC) 1,700.00 850.00 - 0.013 Pasir Pasang (PP) 350,000.00 4,550.00 - 0.080 OH Pekerja 100,000.00 - 8,000.00 0.400 OH Tukang batu 110,000.00 - 44,000.00 0.040 OH Kepala Tukang 150,000.00 - 6,000.00 0.004 OH Mandor 150,000.00 - 600.00

Membuat 1 m² Plesteran Ciprat/Kamprotan 1PC : 2 PP 9,444.00 44,750.00 4.320 Kg Portland Cement (PC) 1,700.00 7,344.00 - 0.006 Pasir Pasang (PP) 350,000.00 2,100.00 - 0.300 OH Pekerja 100,000.00 - 30,000.00 0.100 OH Tukang batu 110,000.00 - 11,000.00 0.010 OH Kepala Tukang 150,000.00 - 1,500.00 0.015 OH Mandor 150,000.00 - 2,250.00

Membuat 1 m² Finishing Siar Pasangan Dinding Bata Merah (=20 m') 5,283.60 25,650.00 3.108 Kg Portland Cement (PC) 1,700.00 5,283.60 - 0.150 OH Pekerja 100,000.00 - 15,000.00 0.075 OH Tukang batu 110,000.00 - 8,250.00 0.008 OH Kepala Tukang 150,000.00 - 1,200.00 0.008 OH Mandor 150,000.00 - 1,200.00

Membuat 1 m² Finishing Siar Pasangan Dinding Conblock ekspose (=8 m') 2,720.00 75,050.00 1.600 Kg Portland Cement (PC) 1,700.00 2,720.00 - 0.700 OH Pekerja 100,000.00 - 70,000.00 0.035 OH Tukang batu 110,000.00 - 3,850.00 0.004 OH Kepala Tukang 150,000.00 - 600.00 0.004 OH Mandor 150,000.00 - 600.00

Membuat 1 m² Finishing Siar Pasangan Batu Kali Adukan 1PC : 2PP 14,978.00 48,750.00 6.340 Kg Portland Cement (PC) 1,700.00 10,778.00 - 0.012 Pasir Pasang (PP) 350,000.00 4,200.00 - 0.300 OH Pekerja 100,000.00 - 30,000.00 0.150 OH Tukang batu 110,000.00 - 16,500.00 0.015 OH Kepala Tukang 150,000.00 - 2,250.00 0.015 OH Mandor 150,000.00 2,250.00

Membuat 1 m² Acian 5,525.00 34,000.00 3.250 Kg Portland Cement (PC) 1,700.00 5,525.00 - 0.200 OH Pekerja 100,000.00 - 20,000.00 0.100 OH Tukang batu 110,000.00 - 11,000.00 0.010 OH Kepala Tukang 150,000.00 - 1,500.00 0.010 OH Mandor 150,000.00 - 1,500.00

XIII 7395:2008 PEKERJAAN PENUTUP LANTAI DAN DINDING

m³m³m³

Membuat 1 m¹ Plesteran Skoning lebar 10 mm 1 PC : 2PP

Page 33: Analis Cipta Karya 2012-8 FEB 2012

Page 33 ABK

Memasang 1 m² lantai Ubin PC Abu-abu Ukuran (30 x 30) cm 76,741.65 44,200.00 11.870 Buah Ubin Abu-Abu uk. (30 x 30) cm 3,706.12 43,991.65 - 10.000 Kg Portland Cement (PC) 1,700.00 17,000.00 - 0.045 m3 Pasir Pasang (PP) 350,000.00 15,750.00 - 0.260 OH Pekerja 100,000.00 - 26,000.00 0.130 OH Tukang Batu 110,000.00 - 14,300.00 0.013 OH Kepala Tukang 150,000.00 - 1,950.00 0.013 OH Mandor 150,000.00 - 1,950.00

Memasang 1 m² lantai Ubin PC Abu-abu Ukuran (20 x 20) cm 73,519.20 46,050.00 26.500 Buah Ubin Abu-Abu uk. (20 x 20) cm 1,512.80 40,089.20 - 10.400 Kg Portland Cement (PC) 1,700.00 17,680.00 - 0.045 m3 Pasir Pasang (PP) 350,000.00 15,750.00 - 0.270 OH Pekerja 100,000.00 - 27,000.00 0.135 OH Tukang Batu 110,000.00 - 14,850.00 0.014 OH Kepala Tukang 150,000.00 - 2,100.00 0.014 OH Mandor 150,000.00 - 2,100.00

Memasang 1 m² lantai Ubin Warna Ukuran (30 x 30) cm 109,340.88 44,200.00 11.870 Buah Ubin Warna uk. (30 x 30) cm 4,872.86 57,840.88 - 10.000 Kg Portland Cement (PC) 1,700.00 17,000.00 - 0.045 m3 Pasir Pasang (PP) 350,000.00 15,750.00 - 1.500 Kg Semen Warna 12,500.00 18,750.00 - 0.260 OH Pekerja 100,000.00 - 26,000.00 0.130 OH Tukang Batu 110,000.00 - 14,300.00 0.013 OH Kepala Tukang 150,000.00 - 1,950.00 0.013 OH Mandor 150,000.00 1,950.00

Memasang 1 m² lantai Ubin Warna Ukuran (20 x 20) cm 103,629.85 46,050.00 26.500 Buah Ubin Warna uk. (20 x 20) cm 1,884.90 49,949.85 - 10.400 Kg Portland Cement (PC) 1,700.00 17,680.00 - 0.045 m3 Pasir Pasang (PP) 350,000.00 15,750.00 - 1.620 Kg Semen Warna 12,500.00 20,250.00 - 0.270 OH Pekerja 100,000.00 - 27,000.00 0.135 OH Tukang Batu 110,000.00 - 14,850.00 0.014 OH Kepala Tukang 150,000.00 - 2,100.00 0.014 OH Mandor 150,000.00 2,100.00

Memasang 1 m² lantai Ubin Traso Ukuran (30 x 30) cm 143,067.81 44,200.00 11.870 Buah Ubin Traso uk. (30 x 30) cm 7,714.22 91,567.81 - 10.000 Kg Portland Cement (PC) 1,700.00 17,000.00 - 0.045 m3 Pasir Pasang (PP) 350,000.00 15,750.00 - 1.500 Kg Semen Warna 12,500.00 18,750.00 - 0.260 OH Pekerja 100,000.00 - 26,000.00 0.130 OH Tukang Batu 110,000.00 - 14,300.00 0.013 OH Kepala Tukang 150,000.00 - 1,950.00 0.013 OH Mandor 150,000.00 1,950.00

Memasang 1 m² lantai Ubin Granit Ukuran ( 40 x 40 ) cm 217,765.66 41,950.00 6.630 Buah Ubin Granit 25,506.13 169,105.66 - 9.800 Kg Portland Cement (PC) 1,700.00 16,660.00 - 0.045 m3 Pasir Pasang (PP) 350,000.00 15,750.00 - 1.300 Kg Semen Warna 12,500.00 16,250.00 - 0.250 OH Pekerja 100,000.00 - 25,000.00 0.120 OH Tukang Batu 110,000.00 - 13,200.00 0.012 OH Kepala Tukang 150,000.00 - 1,800.00 0.013 OH Mandor 150,000.00 1,950.00

Memasang 1 m² Plint Ubin PC abu -abu Ukuran (15 x 20 ) cm 30,553.95 21,000.00 5.300 Buah Plint Ubin (15x20) cm 4,971.50 26,348.95 - 1.650 Kg Portland Cement (PC) 1,700.00 2,805.00 - 0.004 m3 Pasir Pasang (PP) 350,000.00 1,400.00 - 0.090 OH Pekerja 100,000.00 - 9,000.00 0.090 OH Tukang Batu 110,000.00 - 9,900.00 0.009 OH Kepala Tukang 150,000.00 - 1,350.00 0.005 OH Mandor 150,000.00 - 750.00

-

1.000 m' 13,937.00 21,000.00 5.300 Buah Plint Ubin PC Warna (10x20) cm 1,830.00 9,699.00 - 1.140 Kg Portland Cement (PC) 1,700.00 1,938.00 -

Memasang 1m¹ Plint Ubin PC Warna Ukuran (10 x 20) cm

Page 34: Analis Cipta Karya 2012-8 FEB 2012

Page 34 ABK

0.003 m3 Pasir Pasang (PP) 350,000.00 1,050.00 - 0.100 Kg Semen Warna 12,500.00 1,250.00 - 0.090 OH Pekerja 100,000.00 - 9,000.00 0.090 OH Tukang Batu 110,000.00 - 9,900.00 0.009 OH Kepala Tukang 150,000.00 - 1,350.00 0.005 OH Mandor 150,000.00 750.00

1.000 m2 Memasang 1 m² Lantai Keramik Ukuran (33 x 33) cm 143,456.33 119,000.00 10.000 Buah Ubin Keramik Ukuran (33 x 33) cm 9,353.33 93,533.33 - 8.190 Kg Portland Cement (PC) 1,700.00 13,923.00 - 0.045 m3 Pasir Pasang (PP) 350,000.00 15,750.00 - 1.620 Kg Semen Warna 12,500.00 20,250.00 - 0.700 OH Pekerja 100,000.00 - 70,000.00 0.350 OH Tukang Batu 110,000.00 - 38,500.00 0.035 OH Kepala Tukang 150,000.00 - 5,250.00 0.035 OH Mandor 150,000.00 - 5,250.00

1.000 m2 Memasang 1 m² Lantai Keramik Ukuran (30 x 30) cm 97,365.37 119,000.00 11.870 Buah Ubin Keramik Ukuran (30 x 30) cm 3,863.97 45,865.37 - 10.000 Kg Portland Cement (PC) 1,700.00 17,000.00 - 0.045 m3 Pasir Pasang (PP) 350,000.00 15,750.00 - 1.500 Kg Semen Warna 12,500.00 18,750.00 - 0.700 OH Pekerja 100,000.00 - 70,000.00 0.350 OH Tukang Batu 110,000.00 - 38,500.00 0.035 OH Kepala Tukang 150,000.00 - 5,250.00 0.035 OH Mandor 150,000.00 - 5,250.00

1.000 m2 Memasang 1 m² Lantai Keramik Ukuran (20 x 20) cm 109,841.83 119,000.00 26.500 Buah Ubin Keramik Ukuran (20 x 20) cm 2,119.31 56,161.83 - 10.400 Kg Portland Cement (PC) 1,700.00 17,680.00 - 0.045 m3 Pasir Pasang (PP) 350,000.00 15,750.00 - 1.620 Kg Semen Warna 12,500.00 20,250.00 - 0.700 OH Pekerja 100,000.00 - 70,000.00 0.350 OH Tukang Batu 110,000.00 - 38,500.00 0.035 OH Kepala Tukang 150,000.00 - 5,250.00 0.035 OH Mandor 150,000.00 - 5,250.00

1.000 m2 Memasang 1 m² Lantai Marmer Ukuran (100x100) cm 938,727.33 119,000.00 1.060 buah Marmer (100 x 100) cm 849,933.33 900,929.33 - 8.190 kg Portland Cement (PC) 1,700.00 13,923.00 - 0.045 m3 Pasir Pasang (PP) 350,000.00 15,750.00 - 0.650 kg Semen Warna 12,500.00 8,125.00 - 0.700 OH Pekerja 100,000.00 - 70,000.00 0.350 OH Tukang Batu 110,000.00 - 38,500.00 0.035 OH Kepala Tukang 150,000.00 - 5,250.00 0.035 OH Mandor 150,000.00 - 5,250.00

1.000 m2 Memasang 1 m² Lantai Karpet 91,813.21 39,600.00 1.050 m2 Karpet 82,553.33 86,681.00 - 0.350 kg Lem 14,663.46 5,132.21 - 0.170 OH Pekerja 100,000.00 - 17,000.00 0.170 OH Tukang Batu 110,000.00 - 18,700.00 0.017 OH Kepala Tukang 150,000.00 - 2,550.00 0.009 OH Mandor 150,000.00 - 1,350.00

- - 1.000 m2 Memasang 1 m² Dinding Keramik Ukuran (20x20) cm,

26.500 Buah Ubin Keramik Ukuran (20x20) cm, 2,119.31 46,360.00 120,750.00 9.300 Kg Portland Cement (PC) 1,700.00 15,810.00 - 0.018 m3 Pasir Pasang (PP) 350,000.00 6,300.00 - 1.940 Kg Semen Warna 12,500.00 24,250.00 - 0.600 OH Pekerja 100,000.00 - 60,000.00 0.450 OH Tukang Batu 110,000.00 - 49,500.00 0.045 OH Kepala Tukang 150,000.00 - 6,750.00 0.030 OH Mandor 150,000.00 - 4,500.00

1.000 m2 Memasang 1 m² Dinding Marmer Ukuran (100x100) cm 985,799.13 221,000.00 1.060 buah Marmer 849,933.33 900,929.33 - 3.003 buah Paku 12 cm 15,600.00 46,846.80 - 12.440 kg Portlan Semen 1,700.00 21,148.00 - 0.025 m3 Pasir Pasang 350,000.00 8,750.00 - 0.650 kg Semen Warna 12,500.00 8,125.00 - 1.300 OH Pekerja 100,000.00 - 130,000.00

Page 35: Analis Cipta Karya 2012-8 FEB 2012

Page 35 ABK

0.650 OH Tukang Batu 110,000.00 - 71,500.00 0.065 OH Kepala Tukang 150,000.00 - 9,750.00 0.065 OH Mandor 150,000.00 - 9,750.00

1.000 m2 Memasang 1 m² Dinding Batu Paras / Batu Tempel Hitam 80,313.33 119,000.00 1.100 m2 Batu Paras 43,716.67 48,088.33 - 11.750 Kg Portland Semen 1,700.00 19,975.00 - 0.035 m3 Pasir Pasang 350,000.00 12,250.00 - 0.700 OH Pekerja 100,000.00 - 70,000.00 0.350 OH Tukang Batu 110,000.00 - 38,500.00 0.035 OH Kepala Tukang 150,000.00 - 5,250.00 0.035 OH Mandor 150,000.00 - 5,250.00

1.000 m2 Memasang 1 m² Wall Paper Lebar 50 cm 215,613.27 57,100.00 2.200 m' Wall Paper 93,000.00 204,600.00 - 0.250 kg Lem 44,053.09 11,013.27 - 0.350 OH Pekerja 100,000.00 - 35,000.00 0.175 OH Tukang Batu 110,000.00 - 19,250.00 0.017 OH Kepala Tukang 150,000.00 - 2,550.00 0.002 OH Mandor 150,000.00 - 300.00

1.000 m' 24,687.25 27,900.00 0.003 m3 Papan Kayu Klas II 7,938,486.90 23,815.46 - 0.050 kg Paku Sekrup 5 cm 17,435.83 871.79 - 0.120 OH Pekerja 100,000.00 - 12,000.00 0.120 OH Tukang Batu 110,000.00 - 13,200.00 0.012 OH Kepala Tukang 150,000.00 - 1,800.00 0.006 OH Mandor 150,000.00 - 900.00

VI 3434:2008 PEKERJAAN KAYU

Membuat dan Memasang 1m³ Kusen Pintu dan Kusen Jendela, Kayu klas I (Kayu Jati) 17,547,263.46 3,377,500.00 1.100 Kayu Klas I (Jati) , Balok 15,921,000.00 17,513,100.00 - 1.250 kg Paku Biasa 2" - 5 " 15,600.00 19,500.00 - 1.000 kg Lem Kayu 14,663.46 14,663.46 - 7.000 OH Pekerja 100,000.00 - 700,000.00 21.000 OH Tukang Kayu 110,000.00 - 2,310,000.00 2.100 OH Kepala Tukang 150,000.00 - 315,000.00 0.350 OH Mandor 150,000.00 - 52,500.00

Membuat dan Memasang 1m³ Kusen Pintu dan Kusen Jendela Kayu klas II (kayu Kamper 10,282,163.46 2,895,000.00 1.200 Kayu Klas II (Kamfer) , Balok 8,540,000.00 10,248,000.00 - 1.250 kg Paku Biasa 2" - 5 " 15,600.00 19,500.00 - 1.000 kg Lem Kayu 14,663.46 14,663.46 - 6.000 OH Pekerja 100,000.00 - 600,000.00 18.000 OH Tukang Kayu 110,000.00 - 1,980,000.00 1.800 OH Kepala Tukang 150,000.00 - 270,000.00 0.300 OH Mandor 150,000.00 - 45,000.00

Membuat dan Memasang 1m² Pintu Klamp Standard Kayu Klas II (Kayu Kamfer) 354,580.00 168,950.00 0.040 Kayu Klas II (Kamfer), papan 8,845,000.00 353,800.00 - 0.050 Kg Paku Biasa 2" - 5 " 15,600.00 780.00 - 0.350 OH Pekerja 100,000.00 - 35,000.00 1.050 OH Tukang Kayu 110,000.00 - 115,500.00 0.105 OH Kepala Tukang 150,000.00 - 15,750.00 0.018 OH Mandor 150,000.00 - 2,700.00

- - Membuat dan Memasang 1m² Daun Pintu Panel Kayu Kayu Klas II (Kayu Kamfer) 361,131.73 482,500.00

0.040 Kayu Klas II (Kamfer), papan 8,845,000.00 353,800.00 - 0.500 kg Lem Kayu 14,663.46 7,331.73 - 1.000 OH Pekerja 100,000.00 - 100,000.00 3.000 OH Tukang Kayu 110,000.00 - 330,000.00 0.300 OH Kepala Tukang 150,000.00 - 45,000.00 0.050 OH Mandor 150,000.00 - 7,500.00

Membuat dan Memasang 1m² Pintu dan Jendela Kaca Kayu Klas II (Kayu Kamfer 216,679.04 386,000.00 0.024 Kayu Klas II (Kamfer), papan 8,845,000.00 212,280.00 - 0.300 kg Lem Kayu 14,663.46 4,399.04 - 0.800 OH Pekerja 100,000.00 - 80,000.00 2.400 OH Tukang Kayu 110,000.00 - 264,000.00 0.240 OH Kepala Tukang 150,000.00 - 36,000.00

Memasang 1 m¹ Plint Kayu Kamper Ukuran (2x10) cm

Page 36: Analis Cipta Karya 2012-8 FEB 2012

Page 36 ABK

0.040 OH Mandor 150,000.00 - 6,000.00

Membuat dan Memasang 1m² Pintu dan Jendela Jalusi Kayu Klas I (Kayu Jati) 1,189,531.73 482,500.00 0.064 Kayu Klas I (Jati), papan 18,471,875.00 1,182,200.00 - 0.500 kg Lem Kayu 14,663.46 7,331.73 - 1.000 OH Pekerja 100,000.00 - 100,000.00 3.000 OH Tukang Kayu 110,000.00 - 330,000.00 0.300 OH Kepala Tukang 150,000.00 - 45,000.00 0.050 OH Mandor 150,000.00 - 7,500.00

Membuat 1m² Daun Pintu kayu lapis (Plywood) Rangkap, Rangka Tertutup Kayu Klas II (lebar samp 333,876.06 337,750.00 (Kayu Kamper) - -

0.025 Kayu Klas II (Kamfer), papan 8,845,000.00 221,125.00 - 0.030 Kg Paku Biasa 1/2" - 1" 16,644.29 499.33 - 0.500 Ltr Lem Kayu 14,663.46 7,331.73 - 1.000 Lbr Plywood tebal 4 mm uk.90x210 cm 104,920.00 104,920.00 - 0.700 OH Pekerja 100,000.00 - 70,000.00 2.100 OH Tukang Kayu 110,000.00 231,000.00 0.210 OH Kepala Tukang 150,000.00 31,500.00 0.035 OH Mandor 150,000.00 5,250.00

Membuat 1m² Pintu Plywood rangkap, rangka expose kayu klas II (Kayu Kamfer) 339,183.06 386,000.00 0.0256 Kayu Klas II (Kamfer), papan 8,845,000.00 226,432.00 - 0.030 Kg Paku Biasa 1/2" - 1" 16,644.29 499.33 - 0.500 Ltr Lem Kayu 14,663.46 7,331.73 - 1.000 Lbr Plywood tebal 4 mm uk.90x210 cm 104,920.00 104,920.00 - 0.800 OH Pekerja 100,000.00 - 80,000.00 2.400 OH Tukang Kayu 110,000.00 - 264,000.00 0.240 OH Kepala Tukang 150,000.00 36,000.00 0.040 OH Mandor 150,000.00 6,000.00

-

Memasang 1m² Jalusi Kusen Kayu Klas I (kayu Jati) 1,110,809.14 367,250.00 0.060 Kayu Klas I (Jati), papan 18,471,875.00 1,108,312.50 - 0.150 Kg Paku Biasa 1/2" - 1" 16,644.29 2,496.64 - 0.670 OH Pekerja 100,000.00 - 67,000.00 2.000 OH Tukang Kayu 110,000.00 - 220,000.00 0.200 OH Kepala Tukang 150,000.00 - 30,000.00 0.335 OH Mandor 150,000.00 - 50,250.00

Memasang 1m² Teakwood Rangkap, Rangka Expose Kayu Klas I (Kayu Jati) 571,615.24 386,000.00 0.025 Kayu Klas I (Jati), papan 18,471,875.00 461,796.88 - 0.030 Kg Paku Biasa 1/2" - 1" 16,644.29 499.33 - 0.300 kg Lem Kayu 14,663.46 4,399.04 - 1.000 Lbr Teakwood (90 x 210) cm x 4 mm 104,920.00 104,920.00 - 0.800 OH Pekerja 100,000.00 - 80,000.00 2.400 OH Tukang Kayu 110,000.00 - 264,000.00 0.240 OH Kepala Tukang 150,000.00 - 36,000.00 0.040 OH Mandor 150,000.00 - 6,000.00

Memasang 1m² Pintu Teakwood Rangkap Lapis Formika, Rangka expose Kayu Klas II Ra 397,750.10 410,200.00 Kayu Kamfer - -

0.025 Kayu Klas II (Kamfer), papan 8,845,000.00 221,125.00 - 0.030 Kg Paku Biasa 1/2" - 1" 16,644.29 499.33 - 0.800 kg Lem Kayu 14,663.46 11,730.77 - 1.000 Lbr Teakwood (90 x 210) cm x 4 mm 104,920.00 104,920.00 - 0.500 Lbr Formika 118,950.00 59,475.00 - 0.850 OH Pekerja 100,000.00 - 85,000.00 2.550 OH Tukang Kayu 110,000.00 - 280,500.00 0.255 OH Kepala Tukang 150,000.00 - 38,250.00 0.043 OH Mandor 150,000.00 - 6,450.00

Memasang 1m³ Konstruksi Kuda-kuda Konvensional Kayu Kelas II Bentang 6 met 9,592,668.58 1,930,000.00 Kayu Kamfer - -

1.100 Kayu Kamfer, balok 8,540,000.00 9,394,000.00 - 15.000 Kg Besi Strip 7,030.71 105,460.58 - 5.600 Kg Paku Biasa 2" - 5" 16,644.29 93,208.00 - 4.000 OH Pekerja 100,000.00 - 400,000.00 12.000 OH Tukang Kayu 110,000.00 - 1,320,000.00 1.200 OH Kepala Tukang 150,000.00 - 180,000.00 0.200 OH Mandor 150,000.00 - 30,000.00

Page 37: Analis Cipta Karya 2012-8 FEB 2012

Page 37 ABK

Memasang 1m³ Konstruksi Kuda-kuda Expose, Kayu Klas I (Kayu Jati) 19,298,020.58 3,232,750.00 1.200 Kayu Klas I (jati), balok 15,921,000.00 19,105,200.00 - 15.000 Kg Besi Strip 7,030.71 105,460.58 - 5.600 Kg Paku Biasa 2" - 5" 15,600.00 87,360.00 - 6.700 OH Pekerja 100,000.00 - 670,000.00 20.100 OH Tukang Kayu 110,000.00 - 2,211,000.00 2.010 OH Kepala Tukang 150,000.00 - 301,500.00 0.335 OH Mandor 150,000.00 - 50,250.00

- - Memasang 1m³ konstruksi Gording, Kayu Klas II Kayu Kamfer 9,546,260.58 1,158,000.00

1.100 Kayu Klas II (Kamfer), balok 8,540,000.00 9,394,000.00 - 15.000 Kg Besi Strip 7,030.71 105,460.58 - 3.000 Kg Paku Biasa 2" - 5" 15,600.00 46,800.00 - 2.400 OH Pekerja 100,000.00 - 240,000.00 7.200 OH Tukang Kayu 110,000.00 - 792,000.00 0.720 OH Kepala Tukang 150,000.00 - 108,000.00 0.120 OH Mandor 150,000.00 - 18,000.00

Memasang 1m² Usuk Reng Genteng Lokal, Kayu Klas II Kayu Kamfer 154,204.00 23,250.00 0.014 Kayu Klas II (Kamfer), Kaso-kaso (5x7) cm 8,540,000.00 119,560.00 - 0.0036 Reng (2x3) cm, Kayu Kamper 8,540,000.00 30,744.00 - 0.250 Kg Paku Biasa 2" - 5" 15,600.00 3,900.00 - 0.100 OH Pekerja 100,000.00 - 10,000.00 0.100 OH Tukang Kayu 110,000.00 - 11,000.00 0.010 OH Kepala Tukang 150,000.00 - 1,500.00 0.005 OH Mandor 150,000.00 - 750.00

Memasang 1m² Usuk Reng Genteng Beton, Kayu Klas II Kayu Kamfer 184,948.00 23,250.00 0.014 Kayu Klas II (Kamfer), Kaso-kaso (5x7) cm 8,540,000.00 119,560.00 - 0.0072 Reng (2x3) cm, Kayu Kamper 8,540,000.00 61,488.00 - 0.250 Kg Paku Biasa 2" - 5" 15,600.00 3,900.00 - 0.100 OH Pekerja 100,000.00 - 10,000.00 0.100 OH Tukang Kayu 110,000.00 - 11,000.00 0.010 OH Kepala Tukang 150,000.00 - 1,500.00 0.005 OH Mandor 150,000.00 - 750.00

Memasang 1m² Rangka Atap Sirap, Kayu Klas II (Kayu Kamfer) 1,412,220.00 27,900.00 0.165 Kayu Klas II (Kamfer), balok 8,540,000.00 1,409,100.00 - 0.200 Kg Paku Biasa 2" - 5" 15,600.00 3,120.00 - 0.120 OH Pekerja 100,000.00 - 12,000.00 0.120 OH Tukang Kayu 110,000.00 - 13,200.00 0.012 OH Kepala Tukang 150,000.00 - 1,800.00 0.006 OH Mandor 150,000.00 - 900.00

Memasang 1m² Rangka Langit-langit (50x100) cm, kayu Klas II Kayu Kamfer 134,636.00 63,750.00 0.0154 Kayu Klas II (Kamfer), balok 8,540,000.00 131,516.00 - 0.200 Kg Paku Biasa 2" - 5" 15,600.00 3,120.00 - 0.150 OH Pekerja 100,000.00 - 15,000.00 0.300 OH Tukang Kayu 110,000.00 - 33,000.00 0.030 OH Kepala Tukang 150,000.00 - 4,500.00 0.075 OH Mandor 150,000.00 - 11,250.00

- - Memasang 1m² Rangka Langit-langit (60x60) cm, kayu Klas II atau III Kayu Kamfer 143,102.00 59,000.00

0.0163 Kayu Klas II (Kamfer), balok 8,540,000.00 139,202.00 - 0.250 Kg Paku Biasa 2" - 5" 15,600.00 3,900.00 - 0.200 OH Pekerja 100,000.00 - 20,000.00 0.300 OH Tukang Kayu 110,000.00 - 33,000.00 0.030 OH Kepala Tukang 150,000.00 - 4,500.00 0.010 OH Mandor 150,000.00 - 1,500.00

- - 201,056.25 35,750.00

0.0108 Kayu klas I (Jati), papan 18,471,875.00 199,496.25 - 0.100 Kg Paku Biasa 2" - 5" 15,600.00 1,560.00 - 0.100 OH Pekerja 100,000.00 - 10,000.00 0.200 OH Tukang Kayu 110,000.00 - 22,000.00 0.020 OH Kepala Tukang 150,000.00 - 3,000.00 0.005 OH Mandor 150,000.00 - 750.00

Memasang 1m¹ Listplank Uk. (3x30)cm Kayu klas I atau klas II Kayu Kamfer 98,075.00 35,750.00 0.011 Kayu klas II (Kamfer), papan 8,845,000.00 97,295.00 - 0.050 Kg Paku Biasa 2" - 5" 15,600.00 780.00 -

m³m³

m³m³

Memasang 1m¹ Listplank Uk. (3x20)cm Kayu klas I (Kayu Jati)m³

Page 38: Analis Cipta Karya 2012-8 FEB 2012

Page 38 ABK

0.100 OH Pekerja 100,000.00 - 10,000.00 0.200 OH Tukang Kayu 110,000.00 - 22,000.00 0.020 OH Kepala Tukang 150,000.00 - 3,000.00 0.005 OH Mandor 150,000.00 - 750.00

Memasang 1m² Rangka Dinding Pemisah (60x120) cm Kayu klas II atau III Kayu K 241,460.00 72,450.00 0.028 Kayu klas II (Kamfer), balok 8,540,000.00 239,120.00 - 0.150 Kg Paku Biasa 2" - 5" 15,600.00 2,340.00 - 0.150 OH Pekerja 100,000.00 - 15,000.00 0.450 OH Tukang Kayu 110,000.00 - 49,500.00 0.045 OH Kepala Tukang 150,000.00 - 6,750.00 0.008 OH Mandor 150,000.00 - 1,200.00

Memasang 1m² Dinding Pemisah Teakwood Rangkap Rangka Kayu Klas II Kayu K 307,744.76 72,450.00 0.028 Kayu klas II (Kamfer), balok 8,540,000.00 239,120.00 - 0.150 Kg Paku Biasa 2" - 5" 15,600.00 2,340.00 - 0.860 Lbr Teakwood 120 x 240 cm tebal 4mm 67,527.00 58,073.22 - 0.560 Ltr Lem Kayu 14,663.46 8,211.54 - 0.150 OH Pekerja 100,000.00 - 15,000.00 0.450 OH Tukang Kayu 110,000.00 - 49,500.00 0.045 OH Kepala Tukang 150,000.00 - 6,750.00 0.008 OH Mandor 150,000.00 - 1,200.00

Memasang 1m² Dinding Lambriziring dari Papan klas I (Kayu Jati) 133,478.50 289,500.00 0.007 Kayu klas I (Jati), papan 18,471,875.00 129,303.13 - 0.100 Kg Paku Biasa 2" - 5" 15,600.00 1,560.00 - 0.150 Kg Paku Sekrup 3,5" 17,435.83 2,615.37 - 0.600 OH Pekerja 100,000.00 - 60,000.00 1.800 OH Tukang Kayu 110,000.00 - 198,000.00 0.180 OH Kepala Tukang 150,000.00 - 27,000.00 0.030 OH Mandor 150,000.00 - 4,500.00

Memasang 1m² Dinding Lambriziring dari Plywood ukuran (120x240) cm 27,843.01 12,070.00 0.400 Lbr Plywood (120 X 240) cm x 4mm 67,527.00 27,010.80 - 0.050 Kg Paku Biasa 1/2" - 1" 16,644.29 832.21 - 0.025 OH Pekerja 100,000.00 - 2,500.00 0.075 OH Tukang Kayu 110,000.00 - 8,250.00 0.008 OH Kepala Tukang 150,000.00 - 1,125.00 0.001 OH Mandor 150,000.00 - 195.00

Memasang 1m² Dinding Bilik, Rangka Kayu Klas III (Kayu Meranti) 112,688.97 17,000.00 1.500 Bilik Bambu 30,000.00 45,000.00 - 0.014 Kayu Klas III (Meranti) 4,819,000.00 67,466.00 - 0.012 Kg Paku Biasa 1/2" - 1" 16,644.29 199.73 - 0.003 m' List Kayu 2/4 7,747.00 23.24 - 0.100 OH Pekerja 100,000.00 - 10,000.00 0.050 OH Tukang Kayu 110,000.00 - 5,500.00 0.005 OH Kepala Tukang 150,000.00 - 750.00 0.005 OH Mandor 150,000.00 750.00

VIII 03-3436-1994 PEKERJAAN PENUTUP ATAP

24,918.50 25,650.00 25 Buah Genteng Plentong 996.74 24,918.50 -

0.15 OH Pekerja 100,000.00 - 15,000.00 0.075 OH Tukang Kayu 110,000.00 - 8,250.00 0.008 OH Kepala Tukang 150,000.00 - 1,200.00 0.008 OH Mandor 150,000.00 - 1,200.00

- - Memasang 1 m² Atap Genteng Kodok / Glasur 148,687.50 25,650.00

25 Buah Genteng Kodok / Glasur 5,947.50 148,687.50 - 0.15 OH Pekerja 100,000.00 - 15,000.00

0.075 OH Tukang Kayu 110,000.00 - 8,250.00 0.008 OH Kepala Tukang 150,000.00 - 1,200.00 0.008 OH Mandor 150,000.00 - 1,200.00

- - Memasang 1 m² Atap Genteng Plentong Super / Besar 15,189.00 23,700.00

12 Buah Genteng Plentong Super / Besar 1,265.75 15,189.00 - 0.15 OH Pekerja 100,000.00 - 15,000.00 0.06 OH Tukang Kayu 110,000.00 - 6,600.00

0.006 OH Kepala Tukang 150,000.00 - 900.00

m²m³

Memasang 1 m² Atap Genteng Plentong Kecil

Page 39: Analis Cipta Karya 2012-8 FEB 2012

Page 39 ABK

0.008 OH Mandor 150,000.00 - 1,200.00 - -

Memasang 1 m Genteng Bubung Plentong 44,574.17 65,300.00 5 Buah Genteng Bubung Plentong 3,954.83 19,774.17 - 8 Kg Portland Semen (PC) 1,700.00 13,600.00 - 0.032 m3 Pasir Pasang (PP) 350,000.00 11,200.00 -

0.4 OH Pekerja 100,000.00 - 40,000.00 0.2 OH Tukang Kayu 110,000.00 - 22,000.00

0.02 OH Kepala Tukang 150,000.00 - 3,000.00 0.002 OH Mandor 150,000.00 - 300.00

Memasang 1 m Genteng Bubung Kodok / Glasur 53,546.25 65,300.00 5 Buah Genteng Bubung Kodok / Glasur 5,749.25 28,746.25 - 8 Kg Portland Semen 1,700.00 13,600.00 - 0.032 m3 Pasir Pasang (PP) 350,000.00 11,200.00 -

0.4 OH Pekerja 100,000.00 - 40,000.00 0.2 OH Tukang Kayu 110,000.00 - 22,000.00

0.02 OH Kepala Tukang 150,000.00 - 3,000.00 0.002 OH Mandor 150,000.00 - 300.00

Memasang 1 m Genteng Bubung Plentong Besar 47,797.00 65,300.00 4 Buah Genteng Bubung Plentong Besar 5,749.25 22,997.00 - 8 Kg Portland Cement 1,700.00 13,600.00 - 0.032 m3 Pasir Pasang 350,000.00 11,200.00 -

0.4 OH Pekerja 100,000.00 - 40,000.00 0.2 OH Tukang Kayu 110,000.00 - 22,000.00

0.02 OH Kepala Tukang 150,000.00 - 3,000.00 0.002 OH Mandor 150,000.00 - 300.00

Memasang 1 m² Atap Asbes Gelombang ( 240 cm X 108 cm X 0,5 cm) 59,087.04 24,650.00 0.6 Lbr Asbes Gelombang 240 cm X 108 cm X 0,5 cm 93,330.00 55,998.00 - 0.12 Kg Paku Payung 25,742.00 3,089.04 - 0.14 OH Pekerja 100,000.00 - 14,000.00 0.075 OH Tukang Kayu 110,000.00 - 8,250.00 0.008 OH Kepala Tukang 150,000.00 - 1,200.00 0.008 OH Mandor 150,000.00 - 1,200.00

- - Memasang 1 m² Atap Asbes Gelombang ( 210 cm X 108 cm X 0,5 cm ) 52,499.04 23,800.00

0.6 Lbr Asbes Gelombang ( 210 cm X 108 cm X 0,5 cm ) 82,350.00 49,410.00 - 0.12 Kg Paku Payung 25,742.00 3,089.04 - 0.14 OH Pekerja 100,000.00 - 14,000.00 0.07 OH Tukang Kayu 110,000.00 - 7,700.00 0.007 OH Kepala Tukang 150,000.00 - 1,050.00 0.007 OH Mandor 150,000.00 - 1,050.00

- - Memasang 1 m² Atap Asbes Gelombang ( 300 cm X 105 cm X 4 mm ) 31,057.54 23,800.00

0.35 Lbr Asbes Gelombang 300 cm X 105 cm X 4 mm 79,910.00 27,968.50 - 0.12 Kg Paku Payung 25,742.00 3,089.04 - 0.14 OH Pekerja 100,000.00 - 14,000.00 0.07 OH Tukang Kayu 110,000.00 - 7,700.00 0.007 OH Kepala Tukang 150,000.00 - 1,050.00 0.007 OH Mandor 150,000.00 - 1,050.00

Memasang 1 m² Atap Asbes Gelombang ( 210 cm X 105 cm X 4 mm ) 28,568.13 23,470.00 0.51 Lbr Asbes Gelombang 210 cm X 105 cm X 4 mm 49,959.00 25,479.09 - 0.12 Kg Paku Payung 25,742.00 3,089.04 - 0.14 OH Pekerja 100,000.00 - 14,000.00 0.067 OH Tukang Kayu 110,000.00 - 7,370.00 0.007 OH Kepala Tukang 150,000.00 - 1,050.00 0.007 OH Mandor 150,000.00 - 1,050.00

Memasang 1 m² Atap Genteng Beton 48,109.00 34,000.00 11 Lbr Genteng Beton Standar 4,331.00 47,641.00 - 0.03 Kg Paku Biasa 2" - 5" 15,600.00 468.00 - 0.2 OH Pekerja 100,000.00 - 20,000.00 0.1 OH Tukang Kayu 110,000.00 - 11,000.00 0.01 OH Kepala Tukang 150,000.00 - 1,500.00 0.01 OH Mandor 150,000.00 - 1,500.00

Memasang 1 m² Atap Sirap 291,553.86 49,050.00 60 Lbr Genteng Sirap 4,803.75 288,225.00 - 0.2 Kg Paku Biasa 1/2" - 1" 16,644.29 3,328.86 -

Page 40: Analis Cipta Karya 2012-8 FEB 2012

Page 40 ABK

0.166 OH Pekerja 100,000.00 - 16,600.00 0.25 OH Tukang Kayu 110,000.00 - 27,500.00 0.025 OH Kepala Tukang 150,000.00 - 3,750.00 0.008 OH Mandor 150,000.00 - 1,200.00

Memasang 1 m Nok Genteng Beton 60,079.43 68,000.00 3.5 Buah Nok Genteng Beton 4,925.55 17,239.43 - 0.05 Kg Paku Biasa 2" - 5" 15,600.00 780.00 - 10.8 Kg Portland Semen 1,700.00 18,360.00 - 0.032 m3 Pasir Pasang 350,000.00 11,200.00 - 1 Kg Semen Warna 12,500.00 12,500.00 - 0.4 OH Pekerja 100,000.00 - 40,000.00 0.2 OH Tukang Kayu 110,000.00 - 22,000.00 0.02 OH Kepala Tukang 150,000.00 - 3,000.00 0.02 OH Mandor 150,000.00 - 3,000.00

Memasang 1 m Nok Sirap 57,354.66 44,650.00 0.4 Lbr Seng Plaat 3" x 6" BJLS 28 32,940.00 13,176.00 - 0.06 Kg Paku Biasa 1/2" - 1" 16,644.29 998.66 - 0.5 Kg Paku Biasa 2" - 5" 15,600.00 7,800.00 - 0.004 m3 Kayu Kamfer Papan Tebal 3 cm 8,845,000.00 35,380.00 - 0.125 OH Pekerja 100,000.00 - 12,500.00 0.25 OH Tukang Kayu 110,000.00 - 27,500.00 0.025 OH Kepala Tukang 150,000.00 3,750.00 0.006 OH Mandor 150,000.00 900.00

Memasang 1 m² Atap Seng Gelombang 23,390.89 20,400.00 0.7 Lbr Seng Gelombang 3" x 6" BJLS 28 32,940.00 23,058.00 - 0.02 Kg Paku Biasa 1/2" - 1" 16,644.29 332.89 - 0.12 OH Pekerja 100,000.00 - 12,000.00 0.06 OH Tukang Kayu 110,000.00 - 6,600.00 0.006 OH Kepala Tukang 150,000.00 - 900.00 0.006 OH Mandor 150,000.00 - 900.00

Memasang 1 m Atap Nok Seng 10,547.77 24,800.00 0.3 Lbr Seng Plaat 3" x 6" BJLS 28 32,940.00 9,882.00 - 0.04 Kg Paku Biasa 1/2" - 1" 16,644.29 665.77 - 0.15 OH Pekerja 100,000.00 - 15,000.00 0.07 OH Tukang Kayu 110,000.00 - 7,700.00 0.008 OH Kepala Tukang 150,000.00 - 1,200.00 0.006 OH Mandor 150,000.00 - 900.00

Memasang 1 m² Allumunium Foil / Sisalation 44,835.00 22,450.00 1.05 m2 Sisalation / Allumunium Foil 42,700.00 44,835.00 - 0.15 OH Pekerja 100,000.00 - 15,000.00 0.05 OH Tukang Kayu 110,000.00 - 5,500.00 0.005 OH Kepala Tukang 150,000.00 - 750.00 0.008 OH Mandor 150,000.00 - 1,200.00

- - IX 2839:2008 PEKERJAAN LANGIT - LANGIT

Memasang 1 m² Langit-langit Asbes Semen Tebal 5 mm 28,583.29 12,350.00 1.100 Lbr Asbes Semen (100 cm X 100 cm X 5 mm) 25,833.50 28,416.85 - 0.010 Kg Paku Tripleks 16,644.29 166.44 - 0.030 OH Pekerja 100,000.00 - 3,000.00 0.070 OH Tukang Kayu 110,000.00 - 7,700.00 0.007 OH Kepala Tukang 150,000.00 - 1,050.00 0.004 OH Mandor 150,000.00 - 600.00

Memasang 1 m² Langit-langit Asbes Semen, tebal 6 mm 36,064.94 12,350.00 1.100 Lbr Asbes Semen (100 cm X 100 cm X 6 mm) 32,635.00 35,898.50 - 0.010 Kg Paku Tripleks 16,644.29 166.44 - 0.030 OH Pekerja 100,000.00 - 3,000.00 0.070 OH Tukang Kayu 110,000.00 - 7,700.00 0.007 OH Kepala Tukang 150,000.00 - 1,050.00 0.004 OH Mandor 150,000.00 - 600.00

Memasang 1 m² Langit-langit Akustik Ukuran (30x30) cm 165,532.21 27,900.00 12.000 Lbr Akustik (30 x 30) cm 13,725.00 164,700.00 - 0.050 Kg Paku Tripleks 16,644.29 832.21 - 0.120 OH Pekerja 100,000.00 - 12,000.00 0.120 OH Tukang Kayu 110,000.00 - 13,200.00

Page 41: Analis Cipta Karya 2012-8 FEB 2012

Page 41 ABK

0.012 OH Kepala Tukang 150,000.00 - 1,800.00 0.006 OH Mandor 150,000.00 - 900.00

Memasang 1 m² Langit-langit Akustik Ukuran (30x60) cm 93,409.88 23,250.00 5.800 Lbr Akustik (30x60) cm 15,961.67 92,577.67 - 0.050 Kg Paku Tripleks 16,644.29 832.21 - 0.100 OH Pekerja 100,000.00 - 10,000.00 0.100 OH Tukang Kayu 110,000.00 - 11,000.00 0.010 OH Kepala Tukang 150,000.00 - 1,500.00 0.005 OH Mandor 150,000.00 - 750.00

Memasang 1 m² Langit-langit Akustik Ukuran (60x120) cm 35,144.71 23,250.00 1.500 Lbr Akustik ( 60 x 120) cm 22,875.00 34,312.50 - 0.050 Kg Paku Tripleks 16,644.29 832.21 - 0.100 OH Pekerja 100,000.00 - 10,000.00 0.100 OH Tukang Kayu 110,000.00 - 11,000.00 0.010 OH Kepala Tukang 150,000.00 - 1,500.00 0.005 OH Mandor 150,000.00 - 750.00

Memasang 1 m² Langit-langit Tripleks Uk (120x240) cm, Tebal 3 mm 19,880.69 23,250.00 0.375 Lbr Tripleks 120 x 240 tebal 3 mm 51,683.64 19,381.36 - 0.030 Kg Paku Tripleks 16,644.29 499.33 - 0.100 OH Pekerja 100,000.00 - 10,000.00 0.100 OH Tukang Kayu 110,000.00 - 11,000.00 0.010 OH Kepala Tukang 150,000.00 - 1,500.00 0.005 OH Mandor 150,000.00 - 750.00

Memasang 1 m² Langit-langit Tripleks Uk (120x240) cm,Tebal 4 mm 25,821.95 23,250.00 0.375 Lbr Tripleks 120 x 240 tebal 4 mm 67,527.00 25,322.63 - 0.030 Kg Paku Tripleks 16,644.29 499.33 - 0.100 OH Pekerja 100,000.00 - 10,000.00 0.100 OH Tukang Kayu 110,000.00 - 11,000.00 0.010 OH Kepala Tukang 150,000.00 - 1,500.00 0.005 OH Mandor 150,000.00 - 750.00

Memasang 1 m² Langit-langit Tripleks Uk (120x240) cm, Tebal 6 mm 30,770.58 23,250.00 0.375 Lbr Tripleks 120 x 240 tebal 6 mm 80,723.33 30,271.25 - 0.030 Kg Paku Tripleks 16,644.29 499.33 - 0.100 OH Pekerja 100,000.00 - 10,000.00 0.100 OH Tukang Kayu 110,000.00 - 11,000.00 0.010 OH Kepala Tukang 150,000.00 - 1,500.00 0.005 OH Mandor 150,000.00 - 750.00

Memasang 1 m² Langit-langit Lambriziring Kayu, tebal 9 mm 277,244.57 186,000.00 0.015 m3 Kayu papan (Jati) 18,471,875.00 277,078.13 - 0.010 Kg Paku Biasa 1/2" - 1" 16,644.29 166.44 - 0.800 OH Pekerja 100,000.00 - 80,000.00 0.800 OH Tukang Kayu 110,000.00 - 88,000.00 0.080 OH Kepala Tukang 150,000.00 - 12,000.00 0.040 OH Mandor 150,000.00 - 6,000.00

Memasang 1 m² Langit-langit Gypsum Board, Ukuran (1200x24000x9) mm 28,858.80 17,000.00 0.364 Lbr Gypsum Board 74,013.33 26,940.85 - 0.110 Kg Paku Sekrup 17,435.83 1,917.94 - 0.100 OH Pekerja 100,000.00 - 10,000.00 0.050 OH Tukang Kayu 110,000.00 - 5,500.00 0.005 OH Kepala Tukang 150,000.00 - 750.00 0.005 OH Mandor 150,000.00 - 750.00

Memasang 1 m² Langit-langit Akustik Uk (60x120) cm + Rangka Allumunium 521,569.25 116,250.00 3.600 m' Profil Allumunium "T" 126,000.00 453,600.00 - 0.150 kg Kawat Ø 4 mm 32,228.33 4,834.25 - 1.050 bh Ramset 27,450.00 28,822.50 - 1.500 lbr Akuatik 60 x 120 cm 22,875.00 34,312.50 - 0.500 OH Pekerja 100,000.00 - 50,000.00 0.500 OH Tukang Kayu 110,000.00 - 55,000.00 0.050 OH Kepala Tukang 150,000.00 - 7,500.00 0.025 OH Mandor 150,000.00 - 3,750.00

8,300.79 11,700.00 1.050 m1 List Kayu Profil 7,747.00 8,134.35 - 0.010 Kg Paku 16,644.29 166.44 -

Memasang 1 m¹ List Langit-Langit Kayu Profil

Page 42: Analis Cipta Karya 2012-8 FEB 2012

Page 42 ABK

0.050 OH Pekerja 100,000.00 - 5,000.00 0.050 OH Tukang Kayu 110,000.00 - 5,500.00 0.005 OH Kepala Tukang 150,000.00 - 750.00 0.003 OH Mandor 150,000.00 - 450.00

X RSNI T-15-2002 PEKERJAAN PIPA DAN SANITER

Memasang 1 Buah Closet Duduk / Mono Blok 564,893.27 475,150.00 1.000 Buah Closet Duduk / Monoblok 532,918.18 532,918.18 - 0.060 Kelengkapan 6% dari harga Kloset 532,918.18 31,975.09 - 3.300 OH Pekerja 100,000.00 - 330,000.00 1.100 OH Tukang Batu 110,000.00 - 121,000.00 0.001 OH Kepala Tukang 150,000.00 - 150.00 0.160 OH Mandor 150,000.00 - 24,000.00

Memasang 1 Buah Closet Jongkok Porselen 128,583.33 514,000.00 1.000 Buah Kloset Jongkok Poselen 114,883.33 114,883.33 - 6.000 Kg Portland Cement (PC) 1,700.00 10,200.00 - 0.010 m3 Pasir Pasang (PP) 350,000.00 3,500.00 - 1.000 OH Pekerja 100,000.00 - 100,000.00 1.500 OH Tukang Batu 110,000.00 - 165,000.00 1.500 OH Kepala Tukang 150,000.00 - 225,000.00 0.160 OH Mandor 150,000.00 - 24,000.00

Memasang 1 Buah Urinoir 407,556.67 240,000.00 1.000 Buah Urinoir 302,966.67 302,966.67 - 0.300 - Perlengkapan 30% Harga Urinoir 302,966.67 90,890.00 - 6.000 Kg Portland Cement (PC) 1,700.00 10,200.00 - 0.010 m3 Pasir Pasang (PP) 350,000.00 3,500.00 - 1.000 OH Pekerja 100,000.00 - 100,000.00 1.000 OH Tukang Batu 110,000.00 - 110,000.00 0.100 OH Kepala Tukang 150,000.00 15,000.00 0.100 OH Mandor 150,000.00 15,000.00

Memasang 1 Buah Wastafel 360,637.50 173,450.00 1.000 Buah Wastafel 266,875.00 266,875.00 - 0.300 - Perlengkapan 30% Harga Wastafel 266,875.00 80,062.50 - 6.000 Kg Portland Cement (PC) 1,700.00 10,200.00 - 0.010 m3 Pasir Pasang (PP) 350,000.00 3,500.00 - 1.200 OH Pekerja 100,000.00 - 120,000.00 0.145 OH Tukang Batu 110,000.00 - 15,950.00 0.150 OH Kepala Tukang 150,000.00 22,500.00 0.100 OH Mandor 150,000.00 15,000.00

Memasang 1 Unit Bak Mandi Batu Bata Volume 0,30 m3 1,238,775.76 1,020,000.00 0.400 m3 Batu Bata 1,575,000.00 630,000.00 - 120.000 Kg Portland Cement (PC) 1,700.00 204,000.00 - 0.300 m3 Pasir Pasang (PP) 350,000.00 105,000.00 - 360.000 buah Porselen 11 x 11 cm 624.38 224,775.76 - 6.000 Kg Semen Nat 12,500.00 75,000.00 - 6.000 OH Pekerja 100,000.00 - 600,000.00 3.000 OH Tukang Batu 110,000.00 330,000.00 0.300 OH Kepala Tukang 150,000.00 45,000.00 0.300 OH Mandor 150,000.00 45,000.00

Memasang 1 m Pipa Beton, Ø 20 cm - 100 cm 121,159.00 23,800.00 1.100 Buah Pipa Beton 42,700.00 46,970.00 - 0.027 m3 Batu Bata 1,575,000.00 42,525.00 - 3.920 Kg Portland Cement (PC) 1,700.00 6,664.00 - 0.056 m3 Pasir Pasang (PP) 350,000.00 19,600.00 - 0.024 m3 Pasir Urug 225,000.00 5,400.00 - 0.140 OH Pekerja 100,000.00 - 14,000.00 0.070 OH Tukang Batu 110,000.00 7,700.00 0.007 OH Kepala Tukang 150,000.00 1,050.00 0.007 OH Mandor 150,000.00 1,050.00

Memasang 1m Pipa Beton, Ø 30 cm - 100 cm 985,498.33 64,600.00 1.100 Buah Pipa Beton 58,966.67 64,863.33 - 0.550 m3 Batu Bata 1,575,000.00 866,250.00 - 10.300 Kg Portland Cement (PC) 1,700.00 17,510.00 - 0.061 m3 Pasir Pasang (PP) 350,000.00 21,350.00 - 0.069 m3 Pasir Urug 225,000.00 15,525.00 -

Page 43: Analis Cipta Karya 2012-8 FEB 2012

Page 43 ABK

0.380 OH Pekerja 100,000.00 - 38,000.00 0.190 OH Tukang Batu 110,000.00 20,900.00 0.019 OH Kepala Tukang 150,000.00 2,850.00 0.019 OH Mandor 150,000.00 2,850.00

Memasang 1 m Pipa Medium A Galvanis DN ½" 26,420.24 20,700.00 1.200 m' Pipa Medium A Galvanis DN ½" 19,977.50 23,973.00 - 0.350 Perlengkapan 35% Harga Pipa 6,992.13 2,447.24 - 0.054 OH Pekerja 100,000.00 - 5,400.00 0.090 OH Tukang Ledeng 110,000.00 - 9,900.00 0.009 OH Kepala Tukang 150,000.00 - 1,350.00 0.027 OH Mandor 150,000.00 - 4,050.00

Memasang 1 m Pipa Medium A Galvanis DN 25 ( ¾" ) 33,882.45 20,700.00 1.200 m' Pipa Medium A Galvanis DN 25 ( ¾" ) 25,620.00 30,744.00 - 0.350 Perlengkapan 35% Harga Pipa 8,967.00 3,138.45 - 0.054 OH Pekerja 100,000.00 - 5,400.00 0.090 OH Tukang Ledeng 110,000.00 - 9,900.00 0.009 OH Kepala Tukang 150,000.00 - 1,350.00 0.027 OH Mandor 150,000.00 - 4,050.00

Memasang 1 m Pipa Medium A Galvanis DN 32 ( 1" ) 54,386.71 29,205.00 1.200 m' Pipa Medium A Galvanis DN 32 ( 1" ) 41,124.17 49,349.00 - 0.350 Perlengkapan 35% Harga Pipa 14,393.46 5,037.71 - 0.054 OH Pekerja 100,000.00 - 5,400.00 0.090 OH Tukang Ledeng 110,000.00 - 9,900.00 0.090 OH Kepala Tukang 150,000.00 - 13,500.00 0.0027 OH Mandor 150,000.00 - 405.00

Memasang 1 m Pipa Medium A Galvanis DN 50 ( 1½" ) 81,008.64 34,110.00 1.200 m' Pipa Medium A Galvanis DN 50 ( 1½" ) 61,254.17 73,505.00 - 0.350 Perlengkapan 35% Harga Pipa 21,438.96 7,503.64 - 0.108 OH Pekerja 100,000.00 - 10,800.00 0.180 OH Tukang Ledeng 110,000.00 - 19,800.00 0.018 OH Kepala Tukang 150,000.00 - 2,700.00 0.0054 OH Mandor 150,000.00 - 810.00

Memasang 1 m Pipa Medium A Galvanis DN 90 ( 3" ) 174,790.42 34,110.00 1.200 Pipa Medium A Galvanis DN 90 ( 3" ) 132,166.67 158,600.00 - 0.350 Perlengkapan 35% Harga Pipa 46,258.33 16,190.42 - 0.108 OH Pekerja 100,000.00 - 10,800.00 0.180 OH Tukang Ledeng 110,000.00 - 19,800.00 0.018 OH Kepala Tukang 150,000.00 - 2,700.00 0.0054 OH Mandor 150,000.00 - 810.00

255,462.92 42,645.00 1.200 m' Pipa Medium A Galvanis DN 110 ( 4" ) 193,166.67 231,800.00 - 0.350 Perlengkapan 35% Harga Pipa 67,608.33 23,662.92 - 0.135 OH Pekerja 100,000.00 - 13,500.00 0.225 OH Tukang Ledeng 110,000.00 - 24,750.00 0.0225 OH Kepala Tukang 150,000.00 - 3,375.00 0.0068 OH Mandor 150,000.00 - 1,020.00

-

Memasang 1 m1 Pipa PVC SNI 06-0084-2002 SCJ S10(10 bar) Ø 1/2" #VALUE! 1.200 m' PVC Pipa PVC SNI 06-0084-2002 Ø 1/2" 3,025.60 3,630.72 0.350 Perlengkapan 35% Harga Pipa 1,058.96 370.64 0.036 OH Pekerja 100,000.00 3,600.00 0.060 OH Tukang Ledeng 110,000.00 6,600.00 0.006 OH Kepala Tukang 150,000.00 900.00 0.0018 OH Mandor 150,000.00 270.00

-

Memasang 1 m1 Pipa PVC SNI 06-0084-2002 SCJ S10(10 bar) Ø 3/4" #VALUE! 1.200 m' PVC Pipa PVC SNI 06-0084-2002 Ø ¾" 4,453.00 5,343.60 0.350 Perlengkapan 35% Harga Pipa 1,558.55 545.49 0.036 OH Pekerja 100,000.00 3,600.00 0.060 OH Tukang Ledeng 110,000.00 6,600.00 0.006 OH Kepala Tukang 150,000.00 900.00 0.0018 OH Mandor 150,000.00 270.00

Memasang 1 m1 Pipa PVC SNI 06-0084-2002 SCJ S10(10 bar) Ø 1" #VALUE! 1.200 m' Pipa PVC SNI 06-0084-2002 SCJ S12,5(10 bar) Ø 1" 7,588.40 9,106.08 0.350 Perlengkapan 35% Harga Pipa 2,655.94 929.58

Memasang 1 m Pipa Medium A Galvanis DN 110 ( 4" )

Page 44: Analis Cipta Karya 2012-8 FEB 2012

Page 44 ABK

0.036 OH Pekerja 100,000.00 3,600.00 0.060 OH Tukang Ledeng 110,000.00 6,600.00 0.006 OH Kepala Tukang 150,000.00 900.00 0.0018 OH Mandor 150,000.00 270.00

Memasang 1 m1 Pipa PVC SNI 06-0084-2002 SCJ S12,5(10 bar) Ø 2" #VALUE! 1.200 m' Pipa PVC SNI 06-0084-2002 SCJ S12,5(10 bar) Ø 2" 27,023.00 32,427.60 0.350 Perlengkapan 35% Harga Pipa 9,458.05 3,310.32 0.054 OH Pekerja 100,000.00 5,400.00 0.090 OH Tukang Ledeng 110,000.00 9,900.00 0.009 OH Kepala Tukang 150,000.00 1,350.00 0.0027 OH Mandor 150,000.00 405.00

Memasang 1 m1 Pipa PVC SNI 06-0084-2002 SCJ S12,5(10 bar) Ø 3" #VALUE! 1.200 m' Pipa PVC SNI 06-0084-2002 SCJ S12,5(10 bar) Ø 3" 54,790.20 65,748.24 0.350 Perlengkapan 35% Harga Pipa 19,176.57 6,711.80 0.081 OH Pekerja 100,000.00 8,100.00 0.135 OH Tukang Ledeng 110,000.00 14,850.00 0.135 OH Kepala Tukang 150,000.00 20,250.00 0.0041 OH Mandor 150,000.00 615.00

Memasang 1 m1 Pipa PVC SNI 06-0084-2002 SCJ S12,5(10 bar) Ø 4" #VALUE! 1.200 m' Pipa PVC SNI 06-0084-2002 SCJ S12,5(10 bar) Ø 4" 82,289.00 98,746.80 0.350 Perlengkapan 35% Harga Pipa 28,801.15 10,080.40 0.081 OH Pekerja 100,000.00 8,100.00 0.135 OH Tukang Ledeng 110,000.00 14,850.00 0.135 OH Kepala Tukang 150,000.00 20,250.00 0.0041 OH Mandor 150,000.00 615.00

Memasang 1 buah Bak Cuci Piring Stainles Steel #VALUE! 1.000 Buah Bak Cuci Stainles Steel 249,422.22 249,422.22 1.000 Set Water Drain & assesories 249,422.22 249,422.22 0.300 OH Tukang Ledeng 110,000.00 33,000.00 0.030 OH Kepala Tukang 150,000.00 4,500.00

Memasang 1 buah Kran Ø ¾" atau ½" #VALUE! 1.000 Buah Kran Air 15,707.50 15,707.50 0.025 Set Seal Tape 4,244.58 106.11 0.100 OH Tukang Ledeng 110,000.00 11,000.00 0.010 OH Kepala Tukang 150,000.00 1,500.00

1.000 Buah Memasang 1 buah Floor Drain #VALUE! 1.000 Buah Floor Drain 9,353.33 9,353.33 0.100 OH Tukang Batu 52,000.00 1,500.00 0.010 OH Kepala Tukang 150,000.00 1,500.00

XI 7393:2008 PEKERJAAN BESI & ALLUMUNIUM

Memasang 1 kg Besi Profil #VALUE! 1.150 Kg Besi Profil 12,078.00 13,889.70 0.060 Kg Meni Besi 21,738.18 1,304.29 0.060 OH Pekerja 100,000.00 6,000.00 0.060 OH Tukang Besi 110,000.00 6,600.00 0.006 OH Kepala Tukang 150,000.00 900.00 0.003 OH Mandor 150,000.00 450.00

Memasang 1 kg Rangka Kuda-kuda Baja IWF #VALUE! 1.150 kg Baja Konstruksi (Baja IWF) - -

Tenaga 0.060 OH Pekerja 100,000.00 6,000.00 0.060 OH Tukang Besi 110,000.00 6,600.00 0.006 OH Kepala Tukang 150,000.00 900.00 0.003 OH Mandor 150,000.00 450.00

Mengerjakan 100 kg Pekerjaan Perakitan 13,950.00 1.000 ltr Solar 4,500.00 4,500.00 0.100 ltr Minyak Pelumas 48,800.00 4,880.00 0.100 OH Pekerja 100,000.00 10,000.00 0.100 OH Tukang Besi 110,000.00 11,000.00 0.001 OH Kepala Tukang 150,000.00 150.00 0.005 OH Mandor 150,000.00 780.00 0.800 Jam Sewa Alat 100,000.00 80,000.00

F1822
User:
Page 45: Analis Cipta Karya 2012-8 FEB 2012

Page 45 ABK

Membuat 1 m² Pintu Besi Plat Baja tebal 2 mm rangkap, rangka baja Siku 111,310.00 15.000 Kg Besi Siku L.30.30.3 8,207.15 123,107.20 32.800 Kg Besi Plat Baja 7,030.71 230,607.13 0.050 Kg Kawat Las 30,000.00 1,500.00 1.050 OH Pekerja 100,000.00 105,000.00 1.050 OH Tukang Besi 110,000.00 115,500.00 0.105 OH Kepala Tukang 150,000.00 15,750.00 0.052 OH Mandor 150,000.00 7,800.00

Mengerjakan 10 cm Pengelasan dengan Las Listrik #VALUE! 0.400 kg Kawat Las 62,500.00 25,000.00 0.300 ltr Solar 6,750.00 2,025.00 0.040 ltr Minyak Pelumas 48,800.00 1,952.00 0.040 OH Pekerja 100,000.00 4,000.00 0.020 OH Tukang Besi 110,000.00 2,200.00 0.002 OH Kepala Tukang 150,000.00 300.00 0.002 OH Mandor 150,000.00 300.00 0.170 Jam Sewa Alat 100,000.00 17,000.00

Memasang 1 m² Pintu Rolling Door Besi 52,777.00 1.000 m2 Pintu Gulung (Rolling Door) Besi 718,000.00 718,000.00 1.200 OH Pekerja 100,000.00 120,000.00 1.200 OH Tukang Besi 110,000.00 132,000.00 0.120 OH Kepala Tukang 150,000.00 18,000.00 0.006 OH Mandor 150,000.00 900.00

Memasang 1 m² Sunscreen Allumunium #VALUE! 1.000 m2 Sunscreen Allumunium 779,000.00 779,000.00 0.080 OH Pekerja 100,000.00 8,000.00 0.800 OH Tukang Besi 110,000.00 88,000.00 0.080 OH Kepala Tukang 150,000.00 12,000.00 0.004 OH Mandor 150,000.00 600.00

Memasang 1 m² Rolling Door Allumunium #VALUE! 1.000 m2 Rolling Door Allumunium 820,000.00 820,000.00 1.000 OH Pekerja 100,000.00 100,000.00 1.000 OH Tukang Besi 110,000.00 110,000.00 0.100 OH Kepala Tukang 150,000.00 15,000.00 0.050 OH Mandor 150,000.00 7,500.00

Memasang 1 m Kusen Pintu Allumunium #VALUE! 1.100 m' Profil Allumunium (Kusen Alumunium 4") 100,345.00 110,379.50 2.000 buah Skrup Fixer 1,423.33 2,846.67 0.060 Tube Sealant 13,623.33 817.40 0.043 OH Pekerja 100,000.00 4,300.00 0.043 OH Tukang Besi 110,000.00 4,730.00 0.0043 OH Kepala Tukang 150,000.00 645.00 0.0021 OH Mandor 150,000.00 315.00

Memasang 1 m² Pintu Allumunium Strip Lebar 8 cm #VALUE! 4.400 m' Profil Allumunium (Kusen Alumunium 4") 100,345.00 441,518.00 14.600 m' Allumunium Strip 15,000.00 219,000.00 0.085 OH Pekerja 100,000.00 8,500.00 0.085 OH Tukang Besi 110,000.00 9,350.00 0.009 OH Kepala Tukang 150,000.00 1,275.00 0.004 OH Mandor 150,000.00 630.00

- Memasang 1 m² Pintu Kaca Rangka Allumunium #VALUE!

4.400 m' Allumunium Strip 15,000.00 66,000.00 4.500 m' Profil Kaca 10,500.00 47,250.00 0.270 tube Sealant 13,623.33 3,678.30 0.085 OH Pekerja 100,000.00 8,500.00 0.085 OH Tukang Besi 110,000.00 9,350.00 0.008 OH Kepala Tukang 150,000.00 1,200.00 0.004 OH Mandor 150,000.00 600.00

Memasang 1 m² Venetions Blinds & Vertical Blinds #VALUE! 1.000 m2 Venetions Blinds atau Vertical Blinds (tirai) 226,000.00 226,000.00 0.350 OH Pekerja 100,000.00 35,000.00 0.350 OH Tukang Besi 110,000.00 38,500.00 0.035 OH Kepala Tukang 150,000.00 5,250.00 0.018 OH Mandor 150,000.00 2,700.00

Memasang 1 m² Terali Besi Strip (2x3) cm #VALUE! 6.177 kg Besi Strip 2x3 7,030.71 43,428.67

Page 46: Analis Cipta Karya 2012-8 FEB 2012

Page 46 ABK

27.080 cm Pengelasan #VALUE! #VALUE! 1.670 OH Pekerja 100,000.00 167,000.00 1.670 OH Tukang Las 110,000.00 183,700.00 0.167 OH Kepala Tukang 150,000.00 25,050.00 0.083 OH Mandor 150,000.00 12,450.00

Memasang 1 m² Kawat Nyamuk #VALUE! 1.100 m2 Kawat Nyamuk nylon 34,998.75 38,498.63 11.110 cm Pengelasan #VALUE! #VALUE! 1.716 kg Baja Strip (0,2x2) cm 7,030.71 12,064.69 0.100 OH Pekerja 100,000.00 10,000.00 0.100 OH Tukang Kayu 110,000.00 11,000.00 0.010 OH Kepala Tukang 150,000.00 1,500.00 0.005 OH Mandor 150,000.00 750.00

Memasang 1 m² Jendela Nako & Tralis #VALUE! 1.100 m2 Jendela Nako 18,910.00 20,801.00 10.000 buah Paku Skrup 1 - 2,5 cm 17,435.83 174,358.33 7.000 m' Besi Strip 7,030.71 49,214.94 0.200 OH Pekerja 100,000.00 20,000.00 0.200 OH Tukang Kayu 110,000.00 22,000.00 0.020 OH Kepala Tukang 150,000.00 3,000.00 0.001 OH Mandor 150,000.00 150.00

Memasang 1 m¹ Talang Datar/Jurai , Seng BJLS 28 Lebar 90 cm #VALUE! 1.050 Lbr Seng Plaat 32,940.00 34,587.00 0.015 Kg Paku Biasa 1 - 2,5 cm 16,644.29 249.66 0.019 m3 Kayu Papan Kruing 7,938,486.90 150,831.25 0.200 OH Pekerja 100,000.00 20,000.00 0.400 OH Tukang Kayu 110,000.00 44,000.00 0.025 OH Kepala Tukang 150,000.00 3,750.00 0.010 OH Mandor 150,000.00 1,500.00

Memasang 1 m¹ Talang 1/2 Lingkaran Ø 15 cm, Seng Plaat BJLS 30 Lebar 45 cm #VALUE! 1.050 Lbr Seng Plaat 44,936.67 47,183.50 0.010 Kg Paku Biasa 1 - 2,5 cm 16,644.29 166.44 0.500 Kg Besi strip 7,030.71 3,515.35 0.150 OH Pekerja 100,000.00 15,000.00 0.300 OH Tukang Kayu 110,000.00 33,000.00 0.030 OH Kepala Tukang 150,000.00 4,500.00 0.008 OH Mandor 150,000.00 1,200.00

XII Pt T-30-2000-C PEKERJAAN KUNCI dan KACA

Memasang 1 buah Kunci Tanam Biasa #VALUE! 1.000 Buah Kunci Tanam Biasa 118,950.00 118,950.00 0.500 OH Tukang Kayu 110,000.00 55,000.00 0.050 OH Kepala Tukang 150,000.00 7,500.00

Memasang 1 Buah Kunci Silinder #VALUE! 1.000 Buah Kunci Silinder 118,950.00 118,950.00 0.600 OH Tukang Kayu 110,000.00 66,000.00 0.060 OH Kepala Tukang 150,000.00 9,000.00

Memasang 1 buah Kunci Slot untuk Kamar Mandi atau WC #VALUE! 1.000 Buah Kunci Tanam Kamar Mandi 118,950.00 118,950.00 0.250 OH Tukang Kayu 110,000.00 27,500.00 0.025 OH Kepala Tukang 150,000.00 3,750.00

-

Memasang 1 buah Engsel Pintu #VALUE! 1.000 Buah Engsel pintu 14,843.33 14,843.33 0.125 OH Tukang Kayu 110,000.00 13,750.00 0.013 OH Kepala Tukang 150,000.00 1,950.00

-

Memasang 1 buah Engsel Angin untuk pintu #VALUE! 1.000 Buah Engsel Angin 26,673.64 26,673.64 0.125 OH Tukang Kayu 110,000.00 13,750.00 0.013 OH Kepala Tukang 150,000.00 1,950.00

-

Memasang 1 buah engsel pintu klam #VALUE! 1.000 Buah Engsel Jendela 6,987.27 6,987.27 0.250 OH Pekerja 100,000.00 25,000.00 0.250 OH Tukang Kayu 110,000.00 27,500.00 0.025 OH Kepala Tukang 150,000.00 3,750.00 0.130 OH Mandor 150,000.00 19,500.00

Page 47: Analis Cipta Karya 2012-8 FEB 2012

Page 47 ABK

Memasang 1 buah engsel jendela #VALUE! 1.000 Buah Engsel Jendela 6,987.27 6,987.27 0.100 OH Tukang Kayu 110,000.00 11,000.00 0.010 OH Kepala Tukang 150,000.00 1,500.00

Memasang 1 buah Kait Angin #VALUE! 1.000 Buah Kait Angin 7,930.00 7,930.00 0.100 OH Tukang Kayu 110,000.00 11,000.00 0.100 OH Kepala Tukang 150,000.00 15,000.00

Memasang 1 buah Door Closer #VALUE! 1.000 Buah Door Closer 32,177.50 32,177.50 0.200 OH Tukang Kayu 110,000.00 22,000.00 0.020 OH Kepala Tukang 150,000.00 3,000.00

Memasang 1 buah door holder #VALUE! 1.000 Buah Door holder 6,786.25 6,786.25 0.100 OH Tukang Kayu 110,000.00 11,000.00 0.010 OH Kepala Tukang 150,000.00 1,500.00

Memasang 1 buah Door Stop #VALUE! 1.000 Buah Door Stop 32,177.50 32,177.50 0.125 OH Tukang Kayu 110,000.00 - 0.013 OH Kepala Tukang 150,000.00 -

Memasang 1 buah Rel Pintu Dorong #VALUE! 1.000 Buah Rel Pintu Dorong 244,000.00 244,000.00 0.080 OH Pekerja 100,000.00 8,000.00 0.800 OH Tukang Kayu 110,000.00 88,000.00 0.080 OH Kepala Tukang 150,000.00 12,000.00 0.040 OH Mandor 150,000.00 6,000.00

Memasang 1 buah Gerendel #VALUE! 1.000 Buah Grendel 6,786.25 6,786.25 0.100 OH Tukang Kayu 150,000.00 - 0.010 OH Kepala Tukang 150,000.00 -

#VALUE! 1.100 m2 Kaca tebal 3 mm 61,732.00 67,905.20 0.160 OH Pekerja 100,000.00 16,000.00 0.160 OH Tukang Kayu 110,000.00 17,600.00 0.016 OH Kepala Tukang 150,000.00 2,400.00 0.080 OH Mandor 150,000.00 12,000.00

Memasang 1 m² Kaca tebal 5 mm #VALUE! 1.100 m2 Kaca tebal 5mm 76,372.00 84,009.20 0.160 OH Pekerja 100,000.00 16,000.00 0.160 OH Tukang Kayu 110,000.00 17,600.00 0.016 OH Kepala Tukang 150,000.00 2,400.00 0.080 OH Mandor 150,000.00 12,000.00

Memasang 1 m² Kaca Raiben (Cermin) tebal 5 mm #VALUE! 1.100 m2 Kaca Cermin 84,790.00 93,269.00 0.160 OH Pekerja 100,000.00 16,000.00 0.160 OH Tukang Kayu 110,000.00 17,600.00 0.016 OH Kepala Tukang 150,000.00 2,400.00 0.080 OH Mandor 150,000.00 12,000.00

XIV 03-3634-1994 PEKERJAAN PENGECATAN

Mengikis / Mengerok 1 m² Permukaan Cat Tembok Lama #VALUE! 0.050 Kg Soda Api 18,000.00 900.00 0.150 OH Pekerja 100,000.00 15,000.00 0.003 OH Mandor 150,000.00 375.00

Mencuci 1 m² Bidang Permukaan Tembok yang Pernah dicat #VALUE! 0.050 Kg Sabun 21,000.00 1,050.00 0.150 OH Pekerja 100,000.00 15,000.00 0.003 OH Mandor 150,000.00 375.00

Mengerok 1 m² Karat Cat Lama permukaan Baja dg cara manual #VALUE! 0.050 Kg Sabun 21,000.00 1,050.00 0.150 OH Pekerja 100,000.00 15,000.00

Memasang 1 m² Kaca tebal 3 mm

Page 48: Analis Cipta Karya 2012-8 FEB 2012

Page 48 ABK

0.003 OH Mandor 150,000.00 375.00

Menyabun 1 m² Permukaan Tembok Lama #VALUE! 0.050 Kg Sabun 21,000.00 1,050.00 0.150 OH Pekerja 100,000.00 15,000.00 0.003 OH Mandor 150,000.00 375.00

Mendempul dan Menggosok 1 m² Kayu #VALUE! 0.080 Kg Dempul Jadi 19,131.82 1,530.55 0.020 lt Minyak Cat 11,285.00 225.70 0.100 lbr Amplas 3,331.54 333.15 0.040 OH Pekerja 100,000.00 4,000.00 0.040 OH Tukang Cat 110,000.00 4,400.00 0.004 OH Kepala Tukang 150,000.00 600.00 0.003 OH Mandor 150,000.00 375.00

Pengecatan 1 m² Bidang Lama Kayu #VALUE! 0.150 Kg Plamir 19,131.82 2,869.77 0.170 Kg Cat Dasar 21,984.40 3,737.35 0.170 Kg Cat Penutup 31,354.00 5,330.18 0.070 OH Pekerja 100,000.00 7,000.00 0.075 OH Tukang Cat 110,000.00 8,250.00 0.008 OH Kepala Tukang 150,000.00 1,125.00 0.003 OH Mandor 150,000.00 375.00

Pengecatan 1 m² Bidang Kayu Baru (1 lap.Plamir) 1 lap.Cat Dasar & 2 lap.Cat Penutup #VALUE! 0.200 Kg Cat Meni 22,147.69 4,429.54 0.150 Kg Plamir 19,131.82 2,869.77 0.170 Kg Cat Dasar 21,984.40 3,737.35 0.260 Kg Cat Penutup 2 kali 31,354.00 8,152.04 0.070 OH Pekerja 100,000.00 7,000.00 0.009 OH Tukang Cat 110,000.00 990.00 0.006 OH Kepala Tukang 150,000.00 900.00 0.003 OH Mandor 150,000.00 375.00

Pengecatan 1 m² Bidang Kayu Baru (1 lap.Plamir) 1 lap.Cat Dasar & 3 lap.Cat Penutup #VALUE! 0.200 Kg Cat Meni 22,147.69 4,429.54 0.150 Kg Plamir 19,131.82 2,869.77 0.170 Kg Cat Dasar 21,984.40 3,737.35 0.350 Kg Cat Penutup 2 kali 31,354.00 10,973.90 0.070 OH Pekerja 100,000.00 7,000.00 0.105 OH Tukang Cat 110,000.00 11,550.00 0.004 OH Kepala Tukang 150,000.00 600.00 0.003 OH Mandor 150,000.00 375.00

Pelaburan 1 m² Bidang Kayu dg Teak Oil #VALUE! 0.360 Ltr Teak Oil 44,053.09 15,859.11 0.040 OH Pekerja 100,000.00 4,000.00 0.063 OH Tukang Cat 110,000.00 6,930.00 0.063 OH Kepala Tukang 150,000.00 9,450.00 0.003 OH Mandor 150,000.00 375.00

Pelaburan 1 m² Bidang Kayu dg Politur #VALUE! 0.150 Ltr Politur 206,290.91 30,943.64 0.372 Ltr Politur Jadi 44,053.09 16,387.75 2.000 Lbr Ampelas 104,920.00 209,840.00 0.060 OH Tukang Cat 110,000.00 6,600.00 0.016 OH Kepala Tukang 150,000.00 2,400.00 0.003 OH Mandor 150,000.00 375.00

Pelaburan 1 m² Bidang Kayu dg Cat Residu & Ter #VALUE! 0.350 Ltr Residu atau Ter 4,575.00 1,601.25 0.100 OH Pekerja 100,000.00 10,000.00 0.006 OH Mandor 150,000.00 900.00

Pelaburan 1 m² Bidang Kayu dg Vernis #VALUE! 0.150 Ltr Vernis - 0.050 Ltr Dempul 44,053.09 2,202.65 0.100 Lbr Ampelas 3,331.54 333.15 0.010 Buah Kuas 16,000.00 160.00 0.160 OH Pekerja 100,000.00 16,000.00 0.160 OH Tukang Cat 110,000.00 17,600.00 0.016 OH Kepala Tukang 150,000.00 2,400.00 0.003 OH Mandor 150,000.00 375.00

Page 49: Analis Cipta Karya 2012-8 FEB 2012

Page 49 ABK

Pengecatan 1 m² Tembok Baru (1lap.Plamir, 1lap Cat Dasar 2 lap. Cat Penutup) #VALUE! 0.100 Kg Plamir 26,352.00 2,635.20 0.100 Kg Cat Dasar 39,772.00 3,977.20 0.260 Kg Cat Penutup 2 kali 56,933.33 14,802.67 0.020 OH Pekerja 100,000.00 2,000.00 0.063 OH Tukang Cat 110,000.00 6,930.00 0.006 OH Kepala Tukang 150,000.00 945.00 0.003 OH Mandor 150,000.00 375.00

Pengecatan 1 m² Tembok Lama (1lap.Plamir, 2lap Cat Penutup) #VALUE! 0.100 Kg Cat Dasar 39,772.00 3,977.20 0.180 Kg Cat Penutup 2 kali 56,933.33 10,248.00 0.028 OH Pekerja 100,000.00 2,800.00 0.042 OH Tukang Cat 110,000.00 4,620.00 0.004 OH Kepala Tukang 150,000.00 630.00 0.003 OH Mandor 150,000.00 375.00

Pengecatan 1 m² Permukaan Baja dg Meni Besi #VALUE! 0.100 Kg Meni Besi 21,738.18 2,173.82 0.010 Kg Perekat / Lem 25,000.00 250.00 0.020 OH Pekerja 100,000.00 2,000.00 0.200 OH Tukang Cat 110,000.00 22,000.00 0.002 OH Kepala Tukang 150,000.00 300.00 0.010 OH Mandor 150,000.00 1,500.00

Pengecatan 1 m² Permukaan Baja dg Meni Besi & Perancah #VALUE! 0.100 Kg Meni Besi 21,738.18 2,173.82 0.010 Kg Perekat / Lem 25,000.00 250.00 0.002 m3 Perancah Kayu (Kayu Sengon) 686,860.00 1,373.72 0.250 OH Pekerja 100,000.00 25,000.00 0.225 OH Tukang Cat 110,000.00 24,750.00 0.023 OH Kepala Tukang 150,000.00 3,375.00 0.008 OH Mandor 150,000.00 1,125.00

Pengecatan 1 m² Permukaan Baja lapis Seng (Galvanis) secara 2 lap. Cat Penutup) #VALUE! 0.110 Kg Cat dasar 18,300.00 2,013.00 0.170 Kg Cat Antara 18,300.00 3,111.00 0.080 Kg Cat Penutup 46,512.50 3,721.00 0.500 OH Pekerja 100,000.00 50,000.00 0.800 OH Tukang Cat 110,000.00 88,000.00 0.300 OH Kepala Tukang 150,000.00 45,000.00 0.200 OH Mandor 150,000.00 30,000.00

XV G.55.b.1 1 Pasang Paving Tebal 6 cm (K.200) (Type Holland) 73,885.52 1.000 m² Paving Block K.200 59,135.52 59,135.52 0.050 m³ Pasir Urug 225,000.00 11,250.00 0.010 m³ Pasir Pasang 350,000.00 3,500.00 0.060 OH Pekerja 100,000.00 - 0.006 OH Tukang Batu 110,000.00 - 0.200 OH Kepala Tukang 150,000.00 - 0.010 OH Mandor 150,000.00 -

XV G.55.b.2 1 m² Pasang Paving Tebal 6 cm (K.250) (Type Holland) 70,771.66 1.000 m² Paving Block K.250 63,436.02 63,436.02 0.050 m³ Pasir Urug 115,026.61 5,751.33 0.010 m³ Pasir Pasang 158,430.56 1,584.31 0.060 OH Pekerja 100,000.00 - 0.006 OH Tukang Batu 110,000.00 - 0.200 OH Kepala Tukang 150,000.00 - 0.010 OH Mandor 150,000.00 -

-

XV G.55.b.3 1 m² Pasang Paving Tebal 6 cm (K.300) (Type Holland) 73,852.16 1.000 m² Paving Block K.300 66,516.52 66,516.52 0.050 m³ Pasir Urug 115,026.61 5,751.33 0.010 m³ Pasir Pasang 158,430.56 1,584.31 0.060 OH Pekerja 100,000.00 - 0.006 OH Tukang Batu 110,000.00 - 0.200 OH Kepala Tukang 150,000.00 - 0.010 OH Mandor 150,000.00 -

-

XV G.55.b.4 1 m² Pasang Paving Tebal 6 cm (K.400) (Type Holland) 77,939.16 1.000 m² Paving Block K.400 70,603.52 70,603.52 0.050 m³ Pasir Urug 115,026.61 5,751.33 0.010 m³ Pasir Pasang 158,430.56 1,584.31

Page 50: Analis Cipta Karya 2012-8 FEB 2012

Page 50 ABK

0.060 OH Pekerja 100,000.00 - 0.006 OH Tukang Batu 110,000.00 - 0.200 OH Kepala Tukang 150,000.00 - 0.010 OH Mandor 150,000.00 -

XV G.55.c.1 1 m² Pasang Paving Tebal 8 cm (K.250) (Type Holland) 92,039.00 1.000 m² Paving Block K.250 84,703.36 84,703.36 0.050 m³ Pasir Urug 115,026.61 5,751.33 0.010 m³ Pasir Pasang 158,430.56 1,584.31 0.060 OH Pekerja 100,000.00 - 0.006 OH Tukang Batu 110,000.00 - 0.200 OH Kepala Tukang 150,000.00 - 0.010 OH Mandor 150,000.00 -

G.55.c.2 1 m² Pasang Paving Tebal 8 cm (K.300) (Type Holland) - 98,535.50 1.000 m² Paving Block K.300 91,199.86 91,199.86 0.050 m³ Pasir Urug 115,026.61 5,751.33 0.010 m³ Pasir Pasang 158,430.56 1,584.31 0.060 OH Pekerja 100,000.00 - 0.006 OH Tukang Batu 110,000.00 - 0.200 OH Kepala Tukang 150,000.00 - 0.010 OH Mandor 150,000.00 -

G.55.c.3 1 m² Pasang Paving Tebal 8 cm (K.400) (Type Holland) - 105,672.50 1.000 m² Paving Block K.400 98,336.86 98,336.86 0.050 m³ Pasir Urug 115,026.61 5,751.33 0.010 m³ Pasir Pasang 158,430.56 1,584.31 0.060 OH Pekerja 100,000.00 - 0.006 OH Tukang Batu 110,000.00 - 0.200 OH Kepala Tukang 150,000.00 - 0.010 OH Mandor 150,000.00 -

XV G.55.d.1 1 m² Pasang Paving Segitiga Kecil Tebal 6 cm (K.300) - 77,451.16 1.000 m² Paving Block K.300 70,115.52 70,115.52 0.050 m³ Pasir Urug 115,026.61 5,751.33 0.010 m³ Pasir Pasang 158,430.56 1,584.31 0.060 OH Pekerja 100,000.00 - 0.006 OH Tukang Batu 110,000.00 - 0.200 OH Kepala Tukang 150,000.00 - 0.010 OH Mandor 150,000.00 -

XV G.55.d.2 1 m² Pasang Paving Segitiga Besar Tebal 6 cm (K.300) - 78,832.50 1.000 m² Paving Block K.300 71,496.86 71,496.86 0.050 m³ Pasir Urug 115,026.61 5,751.33 0.010 m³ Pasir Pasang 158,430.56 1,584.31 0.060 OH Pekerja 100,000.00 - 0.006 OH Tukang Batu 110,000.00 - 0.200 OH Kepala Tukang 150,000.00 - 0.010 OH Mandor 150,000.00 -

XV G.55.e.1 1 m² Pasang Paving Segitiga Besar Tebal 8 cm (K.300) - 105,581.00 1.000 m² Paving Block K.300 98,245.36 98,245.36 0.050 m³ Pasir Urug 115,026.61 5,751.33 0.010 m³ Pasir Pasang 158,430.56 1,584.31 0.060 OH Pekerja 100,000.00 - 0.006 OH Tukang Batu 110,000.00 - 0.200 OH Kepala Tukang 150,000.00 - 0.010 OH Mandor 150,000.00 -

1 3 4 5 6 7 8

XV Dihit I 1 m Pasang Kanstin Ukuran 13/16 x 28 x 50 K.200 ( Kanan + Kiri ) #VALUE! 4.000 bh Kanstin Ukuran 13/16 x 28 x 50 (K.200) 21,372.32 85,489.28 0.060 m³ Pekerja 100,000.00 6,000.00

XV Dihit II 1 m Pasang Kanstin Ukuran 10 x 20 x 50 K.200 (Kanan + Kiri) #VALUE! 4.000 bh Kanstin Ukuran 10 x 20 x 50 (K.200) 11,765.29 47,061.17 0.060 m³ Pekerja 100,000.00 6,000.00

Page 51: Analis Cipta Karya 2012-8 FEB 2012

Page 51 ABK

PEKERJAAN LISTRIK

1 TITIK INSTALASI LAMPU / PENERANGANBahan -

4.5000 m Kabel NYM 3 X 2,5 mm2 10.0000 m Kabel NYM 2 X 2,5 mm2 5.0000 m Pipa PVC Clipsal 3/4" 3.5000 m Pipa PVC Maspion 5/8" 2.0000 bh T.Doos PVC 3/4 2.0000 bh Elbo PVC Clipsal 4.0000 bh Klem PVC Clipsal 1.0000 bh Sock PVC Clipsal 3/4 3.0000 bh Las Dop Legrand 4 mm2 0.2500 Rol Isolasi Unibel

Tenaga - 0.7500 o/h Pekerja 0.5000 o/h Tukang Listrik 0.0500 o/h Kepala Tukang 0.0100 o/h Mandor

1 TITIK INSTALASI STOP KONTAK / POWER OUTLETBahan -

12.0000 m Kabel NYM 3 x 2,5 mm2 12.0000 m Pipa PVC Clipsal 3/4" 3.5000 m Pipa PVC Maspion 5/8 2.0000 bh T.Doos PVC 3/4 2.0000 bh Elbo PVC Clipsal 4.0000 bh Klem PVC Clipsal 3.0000 bh Sock PVC Clipsal 3/4 3.0000 bh Las Dop Legrand 4 mm2 0.2500 Rol Isolasi Unibel

Tenaga - 0.7500 o/h Pekerja 0.5000 o/h Tukang Listrik 0.0500 o/h Kepala Tukang 0.0100 o/h Mandor

1 TITIK INSTALASI AC 1 PHASEBahan -

30.0000 m Kabel NYM 3 x 4 mm2 30.0000 m Pipa Clipsal PVC 3/4 2.0000 bh Elbo Clipsal PVC 3/4 10.0000 bh Sock PVC Clipsal 3/4 30.0000 bh Klem Clipsal PVC 3/4

Tenaga - 0.7500 o/h Pekerja 0.5000 o/h Tukang Listrik 0.0500 o/h Kepala Tukang 0.0100 o/h Mandor

1 TITIK INSTALASI AC 3 PHASEBahan -

30.0000 m Kabel NYM 4 x 4 mm2 30.0000 m Pipa Clipsal PVC 3/4 2.0000 bh Elbo Clipsal PVC 3/4 10.0000 bh Sock PVC Clipsal 3/4 30.0000 bh Klem Clipsal PVC 3/4

Tenaga - 0.7500 o/h Pekerja 0.5000 o/h Tukang Listrik 0.0500 o/h Kepala Tukang 0.0100 o/h Mandor

1 TITIK INSTALASI SOUND SYSTEMBahan -

12.0000 m Kabel NYM HY 3 X 2,5 mm2 12.0000 m Pipa PVC Clipsal 3/4" 5.0000 m Pipa PVC Maspion 5/8" 2.0000 bh T.Doos PVC 3/4 2.0000 bh Elbo PVC Clipsal 3/4 12.0000 bh Klem PVC Clipsal 3/4 3.0000 bh Sock PVC Clipsal 3/4 3.0000 bh Las Dop Legrand 4 mm2 0.2500 Rol Isolasi Unibel

Tenaga - 0.7500 o/h Pekerja

Page 52: Analis Cipta Karya 2012-8 FEB 2012

Page 52 ABK

0.5000 o/h Tukang Listrik 0.0500 o/h Kepala Tukang 0.0100 o/h Mandor

1 TITIK INSTALASI TELEPHONEBahan -

35.0000 m Kabel ITC 2 x 2 x 0.6 mm2 35.0000 m Pipa PVC Clipsal 3/4" 5.0000 m Pipa PVC Maspion 5/8 1.0000 bh T.Doos PVC 3/4 3.0000 bh Elbo PVC Clipsal 12.0000 bh Klem PVC Clipsal 10.0000 bh Sock PVC Clipsal 3/4

Tenaga - 0.7500 o/h Pekerja 0.5000 o/h Tukang Listrik 0.0500 o/h Kepala Tukang 0.0100 o/h Mandor

1 TITIK INSTALASI FIRE ALARMBahan -

15.0000 m Kabel NYM 2 X 2,5 mm2 15.0000 m Pipa PVC Clipsal 3/4" 1.0000 bh T.Doos PVC 3/4 2.0000 bh Elbo PVC Clipsal 7.0000 bh Klem PVC Clipsal 5.0000 bh Sock PVC Clipsal 3/4 2.0000 bh Las Dop Legrand 4 mm2 0.2500 Rol Isolasi Unibel

Tenaga - 0.7500 o/h Pekerja 0.5000 o/h Tukang Listrik 0.0500 o/h Kepala Tukang 0.0100 o/h Mandor

1 Set GROUNDING PENTANAHANBahan -

3.0000 m' Pipa Gip Ø 2 " 2.0000 o/h Kawat BC 2,5 mm 3.0000 o/h Kabel BC 50 mm 1.0000 o/h Box Pengaman Pasangan Batu Tela

Tenaga - 1.0000 o/h Upah Kerja

1 Unit PEMASANGAN SPLIT AC 1 PK 1.0000 Set Ac Panasonik Split 1 PK 15.0000 m Pipa Tembaga 15.0000 m Pipa PVC 3/4 5.0000 bh Elbo PVC 3/4 10.0000 bh Sock PVC 3/4 0.2500 Tb Lem Pipa 30.0000 bh Klem Clipsal PVC 3/4 0.5000 Btl Freon Merk DUPON

1.000 Ls Biaya alat dan Pemasangan

1 Unit PEMASANGAN SPLIT AC 1,5 PK 1.0000 Set Ac Panasonik Split 1,5 PK 15.0000 m Pipa Tembaga 15.0000 m Pipa PVC 3/4 2.0000 bh Elbo PVC 3/4 10.0000 bh Sock PVC 3/4 0.5000 Tb Lem Pipa 30.0000 bh Klem Clipsal PVC 3/4 0.7500 Btl Freon Merk DUPON

1.000 Ls Biaya alat dan Pemasangan

1 Unit PEMASANGAN SPLIT AC 2 PK 1.0000 Set Ac Panasonik Split 2 PK 15.0000 m Pipa Tembaga 15.0000 m Pipa PVC 3/4 5.0000 bh Elbo PVC 3/4 10.0000 bh Sock PVC 3/4 0.5000 Tb Lem Pipa 30.0000 bh Klem Clipsal PVC 3/4 1.0000 Btl Freon Merk DUPON

1.000 Ls Biaya alat dan Pemasangan

Page 53: Analis Cipta Karya 2012-8 FEB 2012

Page 53 ABK

1 Unit PEMASANGAN AC cassette 5 PK 1.0000 Set Ac Panasonik Cassette 5 PK 15.0000 m Pipa Tembaga 15.0000 m Pipa PVC 3/4 5.0000 bh Elbo PVC 3/4 10.0000 bh Sock PVC 3/4 0.5000 Tb Lem Pipa 30.0000 bh Klem Clipsal PVC 3/4 1.0000 Btl Freon Merk DUPON

1.000 Ls Biaya alat dan Pemasangan

1 Unit PEMASANGAN AC Floor Standing 5 PK 1.0000 Set Ac Panasonik Cassette 5 PK 15.0000 m Pipa Tembaga 15.0000 m Pipa PVC 3/4 5.0000 bh Elbo PVC 3/4 10.0000 bh Sock PVC 3/4 0.5000 Tb Lem Pipa 30.0000 bh Klem Clipsal PVC 3/4 1.0000 Btl Freon Merk DUPON

1.000 Ls Biaya alat dan Pemasangan

1 Unit PASANG POMPA HISAP 1.0000 Set Pompa Hisap

% Perlengkapan (6 % Harga Pompa) 1.8000 o/h Pekerja 2.7000 o/h Tukang 0.5400 o/h Kepala Tukang 0.1100 o/h Mandor

1 Unit PASANG POMPA TEKAN 1.0000 Set Pompa Tekan

% Perlengkapan (6 % Harga Pompa) 1.8000 o/h Pekerja 2.7000 o/h Tukang 0.5400 o/h Kepala Tukang 0.1100 o/h Mandor

Page 54: Analis Cipta Karya 2012-8 FEB 2012

Page 54 ABK

JUMLAH (Rp)

773,477.11

24,971.88 4,250.00 82,716.00 2,250.00 9,000.00 571,571.06 936.00 9,782.18 22,000.00 40,000.00 3,000.00 3,000.00

165,995.41

86,864.00 312.00 55,569.41 - - 11,000.00 10,000.00 1,500.00 750.00

1,882,189.34

24,971.88 818,010.00 13,260.00 7,733.78 59,500.00 52,500.00 45,000.00 150,000.00 63,000.00 4,498.75 37,820.00 4,938.56 10,065.00 2,096.18

6,295.20 220,000.00 110,000.00 200,000.00 45,000.00 7,500.00

389,203.13

1,198.65 17,060.48 73,444.00

Page 55: Analis Cipta Karya 2012-8 FEB 2012

Page 55 ABK

- - - 110,000.00 165,000.00 15,000.00 7,500.00

1,535,231.75 33,961.75 954,345.00 4,680.00 17,850.00 13,500.00 50,000.00 103,395.00 220,000.00 100,000.00 30,000.00 7,500.00

17,500.00 10,000.00 7,500.00

45,160.83 - 965.83 18,700.00 25,000.00 300.00 195.00

1,388,300.00 666,700.00 49,950.00

671,650.00 666,700.00 4,950.00

78,750.00 75,000.00 3,750.00

96,750.00 90,000.00 6,750.00

115,050.00 105,000.00 10,050.00

104,800.00 100,000.00 4,800.00

159,000.00 150,000.00 9,000.00

126,750.00 120,000.00 6,750.00

5,750.00 5,000.00 750.00

Page 56: Analis Cipta Karya 2012-8 FEB 2012

Page 56 ABK

34,500.00 33,000.00 1,500.00

57,500.00 50,000.00 7,500.00

301,500.00 270,000.00 30,000.00 1,500.00

119,100.00 87,600.00 30,000.00 1,500.00

379,614.75 140,000.00 28,410.75 69,204.00 80,000.00 44,000.00 6,000.00 12,000.00

40,430.00 23,180.00 15,000.00 2,250.00

298,750.00 270,000.00 25,000.00 3,750.00

116,350.00 87,600.00 25,000.00 3,750.00

1,518,150.00 750,000.00 343,400.00 169,750.00 150,000.00 82,500.00 11,250.00 11,250.00

1,464,100.00 750,000.00 277,100.00 182,000.00 150,000.00 82,500.00 11,250.00 11,250.00

1,426,600.00 750,000.00 231,200.00 190,400.00 150,000.00 82,500.00 11,250.00

Page 57: Analis Cipta Karya 2012-8 FEB 2012

Page 57 ABK

11,250.00

1,400,250.00 750,000.00 198,900.00 196,350.00 150,000.00 82,500.00 11,250.00 11,250.00

1,364,100.00 750,000.00 154,700.00 204,400.00 150,000.00 82,500.00 11,250.00 11,250.00

1,162,092.47 750,000.00 35,776.50 2,315.97 119,000.00 150,000.00 82,500.00 11,250.00 11,250.00

1,311,836.15 750,000.00 103,700.00 30,936.15 172,200.00 150,000.00 82,500.00 11,250.00 11,250.00

1,285,318.95 750,000.00 69,700.00 27,568.95 183,050.00 150,000.00 82,500.00 11,250.00 11,250.00 3,831,163.18 750,000.00 97,200.00 78,000.00 42,900.00 5,850.00 5,850.00

2,851,363.18 300,000.00 329,800.00 140,400.00 468,000.00 1,144,407.18 35,256.00 340,000.00 93,500.00 12,750.00 25,500.00

1,577,300.00 281,250.00 329,800.00

Page 58: Analis Cipta Karya 2012-8 FEB 2012

Page 58 ABK

140,400.00 468,000.00 240,000.00 88,000.00 12,000.00 17,850.00

1,515,700.08 469,200.00 266,142.86 562,222.22 6,235.00 165,000.00 30,250.00 4,200.00 12,450.00

1,548,256.43 508,300.00 256,821.43 565,000.00 6,235.00 165,000.00 30,250.00 4,200.00 12,450.00

780,851.85 344,310.77 145,371.59 139,469.49 5,800.00 120,000.00 22,000.00 3,000.00 900.00

965,969.69 488,023.09 123,720.50 139,741.10 6,235.00 165,000.00 27,500.00 3,750.00 12,000.00 - 1,643,226.06 526,945.17 118,999.59 782,796.30 6,235.00 165,000.00 27,500.00 3,750.00 12,000.00

1,678,445.20 555,388.24 113,627.51 794,944.44 6,235.00 165,000.00 27,500.00 3,750.00 12,000.00

1,690,855.42

Page 59: Analis Cipta Karya 2012-8 FEB 2012

Page 59 ABK

574,849.28 112,650.77 788,870.37 6,235.00 165,000.00 27,500.00 3,750.00 12,000.00

1,712,616.81 607,783.35 111,348.45 779,000.00 6,235.00 165,000.00 27,500.00 3,750.00 12,000.00

1,718,811.16 618,262.38 110,860.08 775,203.70 6,235.00 165,000.00 27,500.00 3,750.00 12,000.00

1,805,803.67 657,184.46 109,069.39 763,814.81 6,235.00 210,000.00 38,500.00 5,250.00 15,750.00

1,814,232.77 670,657.49 108,581.02 759,259.26 6,235.00 210,000.00 38,500.00 5,250.00 15,750.00

864,242.13 10,438.41 293.80 700.00 770.00 105.00 60.00

851,874.93 9,536.73 195.87 500.00 550.00 75.00 45.00

840,972.33 715,530.00 97.93 25.00 275.00 375.00

Page 60: Analis Cipta Karya 2012-8 FEB 2012

Page 60 ABK

15.00

124,654.40 27,474.40 4,680.00 4,100.00 52,000.00 28,600.00 3,900.00 3,900.00

128,088.70 30,908.70 4,680.00 4,100.00 52,000.00 28,600.00 3,900.00 3,900.00

379,814.40 27,474.40 6,240.00 8,200.00 128,100.00 57,645.00 39,955.00 66,000.00 36,300.00 4,950.00 4,950.00

405,434.40 27,474.40 6,240.00 8,200.00 153,720.00 57,645.00 39,955.00 66,000.00 36,300.00 4,950.00 4,950.00

459,724.40 27,474.40 6,240.00 8,200.00 128,100.00 57,645.00 119,865.00 66,000.00 36,300.00 4,950.00 4,950.00

459,623.30 20,605.80 6,240.00 8,200.00 170,800.00 57,645.00 59,932.50 24,000.00 66,000.00 36,300.00 4,950.00 4,950.00

370,895.80 20,605.80

Page 61: Analis Cipta Karya 2012-8 FEB 2012

Page 61 ABK

6,240.00 6,150.00 128,100.00 57,645.00 39,955.00 66,000.00 36,300.00 4,950.00 4,950.00

59,931.85 18,133.10 9,360.00 9,988.75 15,000.00 5,500.00 750.00 1,200.00

4,105,544.09 137,372.00 23,400.00 16,400.00 1,430,508.97 44,070.00 502,993.12 243,000.00 810,000.00 530,000.00 30,250.00 143,000.00 115,500.00 39,300.00 39,750.00

4,775,100.62 185,452.20 31,200.00 24,600.00 1,907,345.30 58,760.00 502,993.12 243,000.00 810,000.00 565,000.00 30,250.00 171,600.00 154,000.00 48,450.00 42,450.00

8,442,445.07 274,744.00 62,400.00 82,000.00 2,861,017.95 88,140.00 502,993.12 243,000.00 810,000.00 1,281,000.00 576,450.00 399,550.00 705,000.00 30,250.00 181,500.00 231,000.00 60,450.00 52,950.00

6,932,213.62 219,795.20

Page 62: Analis Cipta Karya 2012-8 FEB 2012

Page 62 ABK

49,920.00 65,600.00 1,907,345.30 58,760.00 502,993.12 243,000.00 810,000.00 1,195,600.00 461,160.00 319,640.00 635,000.00 30,250.00 181,500.00 154,000.00 49,950.00 47,700.00

6,389,377.30 219,795.20 49,920.00 65,600.00 1,430,508.97 44,070.00 502,993.12 243,000.00 810,000.00 1,024,800.00 461,160.00 639,280.00 530,000.00 30,250.00 143,000.00 115,500.00 39,750.00 39,750.00

6,515,758.50 164,846.40 49,920.00 65,600.00 1,430,508.97 44,070.00 502,993.12 243,000.00 810,000.00 1,366,400.00 461,160.00 479,460.00 530,000.00 30,250.00 143,000.00 115,500.00 39,300.00 39,750.00

6,389,698.42 171,715.00 46,800.00 49,200.00 1,907,345.30 58,760.00 502,993.12 243,000.00 810,000.00 896,700.00 411,750.00 279,685.00 565,000.00 30,250.00 171,600.00 154,000.00 48,450.00

Page 63: Analis Cipta Karya 2012-8 FEB 2012

Page 63 ABK

42,450.00

74,196.92 1,373.72 156.00 27,247.79 881.40 5,988.01 2,700.00 9,000.00 18,000.00 2,200.00 2,200.00 2,200.00 900.00 1,350.00

106,172.78 2,060.58 312.00 32,697.35 979.33 8,233.52 4,050.00 15,000.00 29,700.00 3,630.00 3,630.00 3,630.00 1,500.00 750.00

485,450.00 294,000.00 73,950.00 28,000.00 60,000.00 22,000.00 3,000.00 4,500.00

471,365.00 294,000.00 56,015.00 31,850.00 60,000.00 22,000.00 3,000.00 4,500.00

461,185.00 294,000.00 45,135.00 32,550.00 60,000.00 22,000.00 3,000.00 4,500.00

456,940.00 294,000.00 37,740.00 35,700.00 60,000.00 22,000.00 3,000.00 4,500.00

457,650.00

Page 64: Analis Cipta Karya 2012-8 FEB 2012

Page 64 ABK

294,000.00 31,450.00 42,700.00 60,000.00 22,000.00 3,000.00 4,500.00

434,298.38 294,000.00 17,136.00 32,375.00 5,787.38 60,000.00 22,000.00 3,000.00 4,500.00

231,962.10 147,000.00 32,215.00 7,997.10 30,000.00 11,000.00 1,500.00 2,250.00

224,597.00 147,000.00 24,429.00 8,418.00 30,000.00 11,000.00 1,500.00 2,250.00

226,350.00 147,000.00 19,550.00 15,050.00 30,000.00 11,000.00 1,500.00 2,250.00

223,956.00 147,000.00 16,456.00 15,750.00 30,000.00 11,000.00 1,500.00 2,250.00

223,044.00 147,000.00 14,144.00 17,150.00 30,000.00 11,000.00 1,500.00 2,250.00

220,300.00 147,000.00 11,050.00 17,500.00 30,000.00 11,000.00 1,500.00 2,250.00

Page 65: Analis Cipta Karya 2012-8 FEB 2012

Page 65 ABK

220,056.75 147,000.00 7,650.00 17,500.00 3,156.75 30,000.00 11,000.00 1,500.00 2,250.00

82,956.80 26,356.80 5,600.00 30,000.00 16,500.00 2,250.00 2,250.00

75,380.80 17,380.80 7,000.00 30,000.00 16,500.00 2,250.00 2,250.00

72,269.20 13,219.20 8,050.00 30,000.00 16,500.00 2,250.00 2,250.00

70,008.00 10,608.00 8,400.00 30,000.00 16,500.00 2,250.00 2,250.00

68,912.80 8,812.80 9,100.00 30,000.00 16,500.00 2,250.00 2,250.00

67,957.20 7,507.20 9,450.00 30,000.00 16,500.00 2,250.00 2,250.00

67,491.20 6,691.20 9,800.00 30,000.00 16,500.00 2,250.00 2,250.00

67,025.20 5,875.20 10,150.00

Page 66: Analis Cipta Karya 2012-8 FEB 2012

Page 66 ABK

30,000.00 16,500.00 2,250.00 2,250.00

65,973.35 9,792.00 631.35 4,550.00 36,000.00 13,200.00 1,800.00

64,152.25 5,100.00 1,052.25 7,000.00 36,000.00 13,200.00 1,800.00

56,156.55 112.50 1,894.05 3,150.00 36,000.00 13,200.00 1,800.00

57,810.65 87.50 1,473.15 5,250.00 36,000.00 13,200.00 1,800.00

100,924.40 23,174.40 9,450.00 40,000.00 22,000.00 3,000.00 3,300.00

96,775.60 17,625.60 10,850.00 40,000.00 22,000.00 3,000.00 3,300.00

93,644.00 14,144.00 11,200.00 40,000.00 22,000.00 3,000.00 3,300.00

90,950.40 11,750.40 12,250.00 40,000.00 22,000.00 3,000.00 1,950.00

Page 67: Analis Cipta Karya 2012-8 FEB 2012

Page 67 ABK

89,559.60 10,009.60 12,600.00 40,000.00 22,000.00 3,000.00 1,950.00

79,806.55 112.50 1,894.05 6,300.00 44,000.00 24,200.00 3,300.00

43,562.80 8,812.80 9,100.00 15,000.00 8,250.00 1,200.00 1,200.00

64,000.00 850.00 4,550.00 8,000.00 44,000.00 6,000.00 600.00

54,194.00 7,344.00 2,100.00 30,000.00 11,000.00 1,500.00 2,250.00

30,933.60 5,283.60 15,000.00 8,250.00 1,200.00 1,200.00

77,770.00 2,720.00 70,000.00 3,850.00 600.00 600.00

63,728.00 10,778.00 4,200.00 30,000.00 16,500.00 2,250.00

39,525.00 5,525.00 20,000.00 11,000.00 1,500.00 1,500.00

Page 68: Analis Cipta Karya 2012-8 FEB 2012

Page 68 ABK

120,941.65 43,991.65 17,000.00 15,750.00 26,000.00 14,300.00 1,950.00 1,950.00

119,569.20 40,089.20 17,680.00 15,750.00 27,000.00 14,850.00 2,100.00 2,100.00

153,540.88 57,840.88 17,000.00 15,750.00 18,750.00 26,000.00 14,300.00 1,950.00 1,950.00

149,679.85 49,949.85 17,680.00 15,750.00 20,250.00 27,000.00 14,850.00 2,100.00 2,100.00

187,267.81 91,567.81 17,000.00 15,750.00 18,750.00 26,000.00 14,300.00 1,950.00 1,950.00

259,715.66 169,105.66 16,660.00 15,750.00 16,250.00 25,000.00 13,200.00 1,800.00 1,950.00

51,553.95 26,348.95 2,805.00 1,400.00 9,000.00 9,900.00 1,350.00 750.00 - 34,937.00 9,699.00 1,938.00

Page 69: Analis Cipta Karya 2012-8 FEB 2012

Page 69 ABK

1,050.00 1,250.00 9,000.00 9,900.00 1,350.00 750.00

262,456.33 93,533.33 13,923.00 15,750.00 20,250.00 70,000.00 38,500.00 5,250.00 5,250.00

216,365.37 45,865.37 17,000.00 15,750.00 18,750.00 70,000.00 38,500.00 5,250.00 5,250.00

228,841.83 56,161.83 17,680.00 15,750.00 20,250.00 70,000.00 38,500.00 5,250.00 5,250.00

1,057,727.33 900,929.33 13,923.00 15,750.00 8,125.00 70,000.00 38,500.00 5,250.00 5,250.00

131,413.21 86,681.00 5,132.21 17,000.00 18,700.00 2,550.00 1,350.00 -

167,110.00 15,810.00 6,300.00 24,250.00 60,000.00 49,500.00 6,750.00 4,500.00

1,206,799.13 900,929.33 46,846.80 21,148.00 8,750.00 8,125.00 130,000.00

Page 70: Analis Cipta Karya 2012-8 FEB 2012

Page 70 ABK

71,500.00 9,750.00 9,750.00

199,313.33 48,088.33 19,975.00 12,250.00 70,000.00 38,500.00 5,250.00 5,250.00

272,713.27 204,600.00 11,013.27 35,000.00 19,250.00 2,550.00 300.00

52,587.25 23,815.46 871.79 12,000.00 13,200.00 1,800.00 900.00

20,924,763.46 17,513,100.00 19,500.00 14,663.46 700,000.00 2,310,000.00 315,000.00 52,500.00

13,177,163.46 10,248,000.00 19,500.00 14,663.46 600,000.00 1,980,000.00 270,000.00 45,000.00

523,530.00 353,800.00 780.00 35,000.00 115,500.00 15,750.00 2,700.00 - 843,631.73 353,800.00 7,331.73 100,000.00 330,000.00 45,000.00 7,500.00

602,679.04 212,280.00 4,399.04 80,000.00 264,000.00 36,000.00

Page 71: Analis Cipta Karya 2012-8 FEB 2012

Page 71 ABK

6,000.00

1,672,031.73 1,182,200.00 7,331.73 100,000.00 330,000.00 45,000.00 7,500.00

671,626.06 - 221,125.00 499.33 7,331.73 104,920.00 70,000.00 231,000.00 31,500.00 5,250.00

725,183.06 226,432.00 499.33 7,331.73 104,920.00 80,000.00 264,000.00 36,000.00 6,000.00 - 1,478,059.14 1,108,312.50 2,496.64 67,000.00 220,000.00 30,000.00 50,250.00

957,615.24 461,796.88 499.33 4,399.04 104,920.00 80,000.00 264,000.00 36,000.00 6,000.00

807,950.10 - 221,125.00 499.33 11,730.77 104,920.00 59,475.00 85,000.00 280,500.00 38,250.00 6,450.00

11,522,668.58 - 9,394,000.00 105,460.58 93,208.00 400,000.00 1,320,000.00 180,000.00 30,000.00

Page 72: Analis Cipta Karya 2012-8 FEB 2012

Page 72 ABK

22,530,770.58 19,105,200.00 105,460.58 87,360.00 670,000.00 2,211,000.00 301,500.00 50,250.00 - 10,704,260.58 9,394,000.00 105,460.58 46,800.00 240,000.00 792,000.00 108,000.00 18,000.00

177,454.00 119,560.00 30,744.00 3,900.00 10,000.00 11,000.00 1,500.00 750.00

208,198.00 119,560.00 61,488.00 3,900.00 10,000.00 11,000.00 1,500.00 750.00

1,440,120.00 1,409,100.00 3,120.00 12,000.00 13,200.00 1,800.00 900.00

198,386.00 131,516.00 3,120.00 15,000.00 33,000.00 4,500.00 11,250.00 - 202,102.00 139,202.00 3,900.00 20,000.00 33,000.00 4,500.00 1,500.00 - 236,806.25 199,496.25 1,560.00 10,000.00 22,000.00 3,000.00 750.00

133,825.00 97,295.00 780.00

Page 73: Analis Cipta Karya 2012-8 FEB 2012

Page 73 ABK

10,000.00 22,000.00 3,000.00 750.00

313,910.00 239,120.00 2,340.00 15,000.00 49,500.00 6,750.00 1,200.00

380,194.76 239,120.00 2,340.00 58,073.22 8,211.54 15,000.00 49,500.00 6,750.00 1,200.00

422,978.50 129,303.13 1,560.00 2,615.37 60,000.00 198,000.00 27,000.00 4,500.00

39,913.01 27,010.80 832.21 2,500.00 8,250.00 1,125.00 195.00

128,938.97 45,000.00 67,466.00 199.73 23.24 10,000.00 5,500.00 750.00

50,568.50 24,918.50 15,000.00 8,250.00 1,200.00 1,200.00 - 174,337.50 148,687.50 15,000.00 8,250.00 1,200.00 1,200.00 - 38,889.00 15,189.00 15,000.00 6,600.00 900.00

Page 74: Analis Cipta Karya 2012-8 FEB 2012

Page 74 ABK

1,200.00 - 109,874.17 19,774.17 13,600.00 11,200.00 40,000.00 22,000.00 3,000.00 300.00

118,846.25 28,746.25 13,600.00 11,200.00 40,000.00 22,000.00 3,000.00 300.00

113,097.00 22,997.00 13,600.00 11,200.00 40,000.00 22,000.00 3,000.00 300.00

83,737.04 55,998.00 3,089.04 14,000.00 8,250.00 1,200.00 1,200.00 - 76,299.04 49,410.00 3,089.04 14,000.00 7,700.00 1,050.00 1,050.00 - 54,857.54 27,968.50 3,089.04 14,000.00 7,700.00 1,050.00 1,050.00

52,038.13 25,479.09 3,089.04 14,000.00 7,370.00 1,050.00 1,050.00

82,109.00 47,641.00 468.00 20,000.00 11,000.00 1,500.00 1,500.00

340,603.86 288,225.00 3,328.86

Page 75: Analis Cipta Karya 2012-8 FEB 2012

Page 75 ABK

16,600.00 27,500.00 3,750.00 1,200.00

128,079.43 17,239.43 780.00 18,360.00 11,200.00 12,500.00 40,000.00 22,000.00 3,000.00 3,000.00

102,004.66 13,176.00 998.66 7,800.00 35,380.00 12,500.00 27,500.00 3,750.00 900.00

43,790.89 23,058.00 332.89 12,000.00 6,600.00 900.00 900.00

35,347.77 9,882.00 665.77 15,000.00 7,700.00 1,200.00 900.00

67,285.00 44,835.00 15,000.00 5,500.00 750.00 1,200.00 -

40,933.29 28,416.85 166.44 3,000.00 7,700.00 1,050.00 600.00

48,414.94 35,898.50 166.44 3,000.00 7,700.00 1,050.00 600.00

193,432.21 164,700.00 832.21 12,000.00 13,200.00

Page 76: Analis Cipta Karya 2012-8 FEB 2012

Page 76 ABK

1,800.00 900.00

116,659.88 92,577.67 832.21 10,000.00 11,000.00 1,500.00 750.00

58,394.71 34,312.50 832.21 10,000.00 11,000.00 1,500.00 750.00

43,130.69 19,381.36 499.33 10,000.00 11,000.00 1,500.00 750.00

49,071.95 25,322.63 499.33 10,000.00 11,000.00 1,500.00 750.00

54,020.58 30,271.25 499.33 10,000.00 11,000.00 1,500.00 750.00

463,244.57 277,078.13 166.44 80,000.00 88,000.00 12,000.00 6,000.00

45,858.80 26,940.85 1,917.94 10,000.00 5,500.00 750.00 750.00

637,819.25 453,600.00 4,834.25 28,822.50 34,312.50 50,000.00 55,000.00 7,500.00 3,750.00

20,000.79 8,134.35 166.44

Page 77: Analis Cipta Karya 2012-8 FEB 2012

Page 77 ABK

5,000.00 5,500.00 750.00 450.00

1,040,043.27 532,918.18 31,975.09 330,000.00 121,000.00 150.00 24,000.00

642,583.33 114,883.33 10,200.00 3,500.00 100,000.00 165,000.00 225,000.00 24,000.00

647,556.67 302,966.67 90,890.00 10,200.00 3,500.00 100,000.00 110,000.00 15,000.00 15,000.00

534,087.50 266,875.00 80,062.50 10,200.00 3,500.00 120,000.00 15,950.00 22,500.00 15,000.00

2,258,775.76 630,000.00 204,000.00 105,000.00 224,775.76 75,000.00 600,000.00 330,000.00 45,000.00 45,000.00

144,959.00 46,970.00 42,525.00 6,664.00 19,600.00 5,400.00 14,000.00 7,700.00 1,050.00 1,050.00

1,050,098.33 64,863.33 866,250.00 17,510.00 21,350.00 15,525.00

Page 78: Analis Cipta Karya 2012-8 FEB 2012

Page 78 ABK

38,000.00 20,900.00 2,850.00 2,850.00

47,120.24 23,973.00 2,447.24 5,400.00 9,900.00 1,350.00 4,050.00

54,582.45 30,744.00 3,138.45 5,400.00 9,900.00 1,350.00 4,050.00

83,591.71 49,349.00 5,037.71 5,400.00 9,900.00 13,500.00 405.00

115,118.64 73,505.00 7,503.64 10,800.00 19,800.00 2,700.00 810.00

208,900.42 158,600.00 16,190.42 10,800.00 19,800.00 2,700.00 810.00

298,107.92 231,800.00 23,662.92 13,500.00 24,750.00 3,375.00 1,020.00

Page 79: Analis Cipta Karya 2012-8 FEB 2012

Page 79 ABK

15,063.10

5,277.70 886,653.60

70,932,288.00

Page 80: Analis Cipta Karya 2012-8 FEB 2012

Page 80 ABK

-

-

-

-

-

Page 81: Analis Cipta Karya 2012-8 FEB 2012

ANALISA HARGA SATUAN PEKERJAAN

KEGIATAN : PEMBANGUNAN GEDUNG KANTOR PEKERJAAN : PEMBANGUNAN GEDUNG DPRD - KABUPATEN MIMIKA (TAHAP III) LOKASI : KOTA TIMIKA T. ANGGARAN : 2011

NO JENIS PEKERJAAN1 2

1 1 M' PAGAR SEMENTARA dari SENG GELOMBANGTINGGI 2 METER 0.0300 M3 Kayu Matoa 5/10 (pengganti dolken) 2.5000 Kg Semen Portland 1.2000 Lbr Seng Gelombang 3" - 5" 0.0050 M3 Pasir Beton 0.0090 M3 Koral Beton 0.0720 M3 Kayu 5/7 0.0600 Kg Paku Biasa 2" - 5" 0.4000 Oh P e k e r j a 0.2000 Oh Tukang Kayu 0.0200 Oh Kepala Tukang 0.0200 Oh M a n d o r

2 1 M2 PEMBUATAN DIREKSI KEET / KONSTRUKSI KAYU 0.0600 m3 Balok Kayu Matoa 5/10 0.2760 m3 Kayu Matoa 0.7000 kg Paku campur 1.5000 lbr Seng Gelombang Bjls 30 1.0000 o/h Pekerja 1.5000 o/h Tukang 0.1500 o/h Kepala Tukang 0.0500 o/h Mandor

3 1 M' PEMASANGAN PAPAN BOUWPLANK 0.0120 m3 Balok Kayu Matoa 0.0200 kg Paku campur 0.0070 m3 Papan Kayu Matoa 0.1000 o/h Pekerja 0.1000 o/h Tukang 0.0100 o/h Kepala Tukang 0.0050 o/h Mandor

4 1 M3 GALIAN TANAH sedalam 1 meter 0.7500 o/h Pekerja 0.0250 o/h Mandor

Page 82: Analis Cipta Karya 2012-8 FEB 2012

5 1 M3 GALIAN TANAH (u/ Pondasi Poer) 1.5000 o/h Pekerja 0.0600 o/h Mandor

6 1 M3 URUGAN TANAH KEMBALI 0.2500 o/h Pekerja 0.0083 o/h Mandor

7 1 M3 MEMADATKAN TANAH DIBAWAH LANTAI 0.2500 o/h Pekerja 0.0250 o/h Mandor

8 1 M3 MEMBUANG TANAH KE LUAR LOKASI 0.5160 o/h Pekerja 0.0500 o/h Mandor 1.0000 M3 Angkutan

9 1 M3 URUGAN SIRTU TIMBUNAN pada LOKASI 1.2000 M3 Sirtu Timbunan 0.3000 o/h Pekerja 0.0100 o/h Mandor

10 1 M3 URUGAN PASIR 1.2000 M3 Pasir urugan 0.3000 o/h Pekerja 0.0100 o/h Mandor

11 1 M3 URUGAN KERIKIL 1.2000 M3 Kerikil 0.3000 o/h Pekerja 0.0100 o/h Mandor

12 1 M3 MEMASANG LAPISAN BATU KOSONG (AAMSTAMPING) 1.2000 m3 Batu gunung 0.4320 M3 Pasir Urug 0.7800 Oh Pekerja 0.3900 o/h Tukang batu

Page 83: Analis Cipta Karya 2012-8 FEB 2012

0.0390 o/h Kepala tukang 0.0390 Oh Mandor

13 1 M3 MEMASANG PONDASI BATU GUNUNG(campuran 1 pc : 4 psr) 1.2000 M3 Batu gunung 163.0000 Kg Semen 0.5200 M3 Pasir 1.5000 o/h Pekerja 0.7500 o/h Tukang batu 0.0750 o/h Kepala tukang 0.0750 o/h Mandor

14 1 M2 PASANGAN BATAKO 1 PC : 2 PSR 23.0000 Bh Batako 10 x 18 x 24 cm 18.9500 Kg Semen 0.0380 M3 Pasir pasang 0.3000 o/h Pekerja 0.1000 o/h Tukang batu 0.0100 o/h Kepala Tukang 0.0150 o/h Mandor

15 1 M2 PASANGAN BATAKO 1 PC : 4 PSR 23.0000 Bh Batako 10 x 18 x 24 cm 11.5000 Kg Semen Pc 0.0430 M3 Pasir Pasang 0.3000 o/h Pekerja 0.1000 o/h Tukang 0.0100 o/h Kepala Tukang 0.0150 o/h Mandor

16 1 M3 LANTAI BETON TUMBUK K.100 230.00 Kg Semen PC 893.00 Kg Pasir Cor

Page 84: Analis Cipta Karya 2012-8 FEB 2012

1,027.00 Kg Kerikil 200.00 Ltr Air 1.20 o/h Pekerja 0.20 o/h Tukang 0.02 o/h Kepala Tukang 0.06 o/h Mandor

17 1 M3 LANTAI BETON TUMBUK K.100 (BERTULANG) RG 1.0000 M3 Beton Tumbuk K. 125 49.3300 Kg Besi Beton

18 1 M3 CAMPURAN BETON K. 225 371.000 Kg Semen Pc 698.000 Kg Pasir cor 1,047.000 Kg Batu Pecah 2/3 215.000 Ltr Air 1.650 o/h Pekerja 0.275 o/h Tukang 0.028 o/h Kepala Tukang 0.083 o/h Mandor

19 1 M3 CAMPURAN BETON K. 175 326.0000 Kg Semen Pc 760.0000 Kg Pasir cor 1,029.000 Kg Batu Pecah 2/3 215.0000 Ltr Air 1.6500 o/h Pekerja 0.2750 o/h Tukang 0.0280 o/h Kepala Tukang 0.0830 o/h Mandor

1 2 3

20 1 M3 CAMPURAN BETON K. 125 (Beton Kolom, Sloof Praktis) 276.0000 Kg Semen Pc 829.0000 Kg Pasir cor 1,012.000 Kg Kerikil 215.0000 Ltr Air 1.6500 o/h Pekerja 0.2750 o/h Tukang 0.0280 o/h Kepala Tukang 0.0830 o/h Mandor

Page 85: Analis Cipta Karya 2012-8 FEB 2012

21 10 KG PEMBESIAN (BESI POLOS / ULIR) 10.5000 Kg Besi beton 0.1500 Kg Kawat pengikat 0.0700 o/h Pekerja 0.0700 o/h Tukang besi 0.0070 o/h Kepala Tukang 0.0040 o/h Mandor

22 1 M2 BEKISTING untuk PONDASI 0.0400 M3 Balok / Papan Kayu Matoa 0.3000 Kg Paku campur 0.1000 Ltr Minyak Bekisting 0.5200 o/h Pekerja 0.2600 o/h Tukang 0.0260 o/h Kepala tukang 0.0260 o/h Mandor

23 1 M2 BEKISTING untuk SLOOF 0.0450 M3 Balok / Papan Kayu Matoa 0.3000 Kg Paku campur 0.1000 Ltr Minyak Bekisting 0.5200 o/h Pekerja 0.2600 o/h Tukang 0.0260 o/h Kepala tukang 0.0260 o/h Mandor

2 3

24 1 M2 BEKISTING untuk KOLOM 0.0400 M3 Balok Kayu kelas III 0.4000 Kg Paku campur 0.2000 Ltr Minyak Bekisting 2.0000 Btg Dolken Kayu - 4 mtr 0.3500 Lbr Tripleks 9 mm 0.0150 M3 Balok Kayu kelas II 0.6600 o/h Pekerja

Page 86: Analis Cipta Karya 2012-8 FEB 2012

0.3300 o/h Tukang 0.0330 o/h Kepala tukang 0.0330 o/h Mandor

25 1 M2 BEKISTING untuk BALOK 0.0400 M3 Balok Kayu kelas III 0.4000 Kg Paku campur 0.2000 Ltr Minyak Bekisting 2.0000 Btg Dolken Kayu - 4 mtr 0.3500 Lbr Tripleks 9 mm 0.0180 M3 Balok Kayu kelas II 0.6600 o/h Pekerja 0.3300 o/h Tukang 0.0330 o/h Kepala tukang 0.0330 o/h Mandor

1 2 3

26 1 M2 BEKISTING untuk PLAT LANTAI 0.0400 M3 Balok Kayu kelas III 0.4000 Kg Paku campur 0.2000 Ltr Minyak Bekisting 0.0150 M3 Balok Kayu kelas II 0.3500 Lbr Tripleks 9 mm 6.0000 Btg Dolken Kayu - 4 mtr 0.6600 o/h Pekerja 0.3300 o/h Tukang 0.0330 o/h Kepala tukang 0.0330 o/h Mandor

27 1 M2 BEKISTING untuk TANGGA 0.0300 M3 Balok Kayu kelas III 0.4000 Kg Paku campur 0.1500 Ltr Minyak Bekisting 0.0150 M3 Balok Kayu kelas II 0.3500 Lbr Tripleks 9 mm 2.0000 Btg Dolken Kayu - 4 mtr

Page 87: Analis Cipta Karya 2012-8 FEB 2012

0.6600 o/h Pekerja 0.3300 o/h Tukang 0.0330 o/h Kepala tukang 0.0330 o/h Mandor

27 1 M2 BEKISTING untuk DINDING 0.0300 M3 Balok Kayu kelas III 0.4000 Kg Paku campur 0.2000 Ltr Minyak Bekisting 0.0200 M3 Balok Kayu kelas II 0.3500 Lbr Tripleks 9 mm 3.0000 Btg Dolken Kayu - 4 mtr 0.6600 o/h Pekerja 0.3300 o/h Tukang 0.0330 o/h Kepala tukang 0.0330 o/h Mandor

28 1 M' KOLOM PRAKTIS BETON BERTULANG (11 x 11) cm 0.0020 M3 Balok Kayu kelas III 0.0100 Kg Paku campur 3.0000 Kg Besi Beton Polos 0.0450 Kg Kawat Beton 4.0000 Kg Semen 0.0060 M3 Pasir Cor 0.0090 M3 Kerikil 0.1800 o/h Pekerja 0.0200 o/h Tukang Batu 0.0200 o/h Tukang Kayu 0.0200 o/h Tukang Besi 0.0060 o/h Kepala tukang 0.0090 o/h Mandor

29 1 M' RINGBALK BETON BERTULANG (10 x 15) cm 0.0030 M3 Balok Kayu kelas III 0.0200 Kg Paku campur 3.6000 Kg Besi Beton Polos 0.0500 Kg Kawat Beton 5.5000 Kg Semen 0.0090 M3 Pasir Cor 0.0150 M3 Kerikil 0.2970 o/h Pekerja 0.0330 o/h Tukang Batu 0.0330 o/h Tukang Kayu 0.0330 o/h Tukang Besi 0.0100 o/h Kepala tukang 0.0150 o/h Mandor

Page 88: Analis Cipta Karya 2012-8 FEB 2012

30 1 M3 DINDING BETON BERTULANG(150 Kg Besi + Bekisting) 0.2400 M3 Balok Kayu kelas III 3.2000 Kg Paku campur 1.6000 Ltr Minyak Bekisting 157.5000 Kg Besi Beton Polos 2.2500 Kg Kawat Beton 336.0000 Kg Semen 0.5400 M3 Pasir Cor 0.8100 M3 Kerikil 0.1600 M3 Balok Kayu kelas II 2.8000 Lbr Tripleks 9 mm 24.0000 Btg Dolken Kayu - 4 mtr 5.3000 o/h Pekerja 0.2750 o/h Tukang Batu 1.3000 o/h Tukang Kayu 1.0500 o/h Tukang Besi 0.2620 o/h Kepala tukang 0.2650 o/h Mandor

31 1 M3 SLOOF PRAKTIS 0.9800 M3 Beton K.175 110.0000 Kg Besi beton 13.3330 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

32 1 M3 BETON PENUTUP SEPTICTANK 1.0000 M3 Beton K.225 150.0000 Kg Besi beton 8.3330 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

33 1 M3 KOLOM LISTPLANK pada ENTRANCE 1.0000 M3 Beton K.125 110.0000 Kg Besi beton 9.6000 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

34 1 M3 BETON SLOOF S.1 1.0000 M3 Beton K. 225 202.7540 Kg Besi beton 6.6000 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

Page 89: Analis Cipta Karya 2012-8 FEB 2012

1 2 3

35 1 M3 BETON SLOOF S.2 1.0000 M3 Beton K. 225 203.8400 Kg Besi beton 8.0000 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

36 1 M3 PONDASI SUMURAN P.1, P.2 & P.3 1.0000 M3 Beton K. 225 162.1630 Kg Besi beton 4.4445 M2 Bekisting

37 1 M3 PONDASI SUMURAN P.4, P.6, & P.7 1.0000 M3 Beton K. 225 103.3732 Kg Besi beton 3.6364 M2 Bekisting

38 1 M3 PONDASI SUMURAN P.5 1.0000 M3 Beton K. 225 95.1160 Kg Besi beton 3.2000 M2 Bekisting

39 1 M3 BETON KOLOM BULAT K.1 ' Ø 45 (LT. 01 & LT. 02) 1.0000 M3 Beton K. 225 123.9340 Kg Besi beton 8.8900 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

40 1 M3 BETON KOLOM BULAT K.1 ' Ø 45 (LT. 03) 1.0000 M3 Beton K. 225 123.9340 Kg Besi beton 8.8900 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

41 1 M3 BETON KOLOM K.1 (LT. 01 & LT. 02) 1.0000 M3 Beton K. 225 123.9340 Kg Besi beton 8.8900 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

42 1 M3 BETON KOLOM K.1 (LT. 03) 1.0000 M3 Beton K. 225 123.9340 Kg Besi beton 8.8900 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

Page 90: Analis Cipta Karya 2012-8 FEB 2012

43 1 M3 BETON KOLOM K.2 (LT. 01 & LT. 02) 1.0000 M3 Beton K. 225 212.0240 Kg Besi beton 8.8900 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

44 1 M3 BETON KOLOM K.2 (LT. 03) 1.0000 M3 Beton K. 225 212.0240 Kg Besi beton 8.8900 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

45 1 M3 BETON KOLOM K.3 (LT. 01 & LT. 02) 1.0000 M3 Beton K. 225 167.9770 Kg Besi beton 8.8900 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

1 2 3

46 1 M3 BETON KOLOM K.3 (LT. 03) 1.0000 M3 Beton K. 225 167.9770 Kg Besi beton 8.8900 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

47 1 M3 BETON KOLOM K.4 (LT. 01 & LT. 02) 1.0000 M3 Beton K. 225 157.6680 Kg Besi beton 10.1600 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

48 1 M3 BETON KOLOM K.4 (LT. 03) 1.0000 M3 Beton K. 225 157.6680 Kg Besi beton 10.1600 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

49 1 M3 BETON KOLOM K.5 (LT. 01 & LT. 02) 1.0000 M3 Beton K. 225 150.2610 Kg Besi beton 13.3330 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

50 1 M3 BETON KOLOM K.5 (LT. 03) 1.0000 M3 Beton K. 225 150.2610 Kg Besi beton

Page 91: Analis Cipta Karya 2012-8 FEB 2012

13.3330 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

51 1 M3 BETON KOLOM K.6 1.0000 M3 Beton K. 225 123.5430 Kg Besi beton 7.9920 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

33 1 M3 BETON POER PLAT (GSG) 1.0000 M3 Beton K. 225 124.6835 Kg Besi beton 2.0000 M2 Bekisting

34 1 M3 BETON KOLOM 40/60 (GSG) 1.0000 M3 Beton K. 225 147.6828 Kg Besi beton 8.3332 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

1 2 335 1 M3 BETON KOLOM BULAT Ø 50 (GSG)

1.0000 M3 Beton K. 225 97.4316 Kg Besi beton 7.9999 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

36 1 M3 BETON SLOOF 30/50 (GSG) 1.0000 M3 Beton K. 225 119.0728 Kg Besi beton 6.6666 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

1 2 3

37 1 M3 BETON SLOOF 15/20 (GSG) 1.0000 M3 Beton K. 175 162.7757 Kg Besi beton 13.3332 M2 Bekisting

Page 92: Analis Cipta Karya 2012-8 FEB 2012

0.5000 o/h Tukang bongkar/siram

38 1 M3 PLAT LANTAI (GSG) 1.0000 M3 Beton K. 175 152.4300 Kg Besi beton 8.3300 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

39 1 M3 BETON RINGBALK 30/50 (GSG) 1.0000 M3 Beton K. 225 119.0733 Kg Besi beton 8.6665 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

40 1 M3 BETON RINGBALK 20/30 (GSG) 1.0000 M3 Beton K. 225 179.0949 Kg Besi beton 13.3280 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

41 1 M3 BETON RINGBALK KONSOL 30/50 (GSG) 1.0000 M3 Beton K. 225 119.0733 Kg Besi beton 8.6665 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

42 1 M3 BETON BALOK UTAMA 30/50 (GSG) 1.0000 M3 Beton K. 225 119.0733 Kg Besi beton 8.6665 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

43 1 M3 BETON BALOK ANAK 20/30 (GSG) 1.0000 M3 Beton K. 225 157.6782 Kg Besi beton 13.3328 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

44 1 M3 BETON KONSOL (GSG) 1.0000 M3 Beton K. 225 119.0733 Kg Besi beton 8.6665 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

Page 93: Analis Cipta Karya 2012-8 FEB 2012

1 2 3

45 1 M3 PLAT ATAP BETON (GSG) 1.0000 M3 Beton K. 175 142.6700 Kg Besi beton 10.0000 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

46 1 M3 PLAT LANTAI (SERVICE) 1.0000 M3 Beton K. 175 152.4300 Kg Besi beton 8.3300 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

47 1 M3 BETON KOLOM 25/25 (SERVICE) 1.0000 M3 Beton K. 175 211.1999 Kg Besi beton 16.0000 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

48 1 M3 BETON SLOOF 20/30 (SERVICE) 1.0000 M3 Beton K. 175 179.0949 Kg Besi beton 13.3280 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

49 1 M3 BETON POER PLAT type 1 (SERVICE) 1.0000 M3 Beton K. 175 130.4378 Kg Besi beton 3.3333 M2 Bekisting

50 1 M3 BETON POER PLAT type 2 (SERVICE) 1.0000 M3 Beton K. 175 126.6660 Kg Besi beton 2.6666 M2 Bekisting

51 1 M3 BETON RINGBALK 20/30 (SERVICE) 1.0000 M3 Beton K. 175

Page 94: Analis Cipta Karya 2012-8 FEB 2012

179.0949 Kg Besi beton 13.3280 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

52 1 M3 BETON KOLOM 12/25 (POS) 1.0000 M3 Beton K. 175 239.7539 Kg Besi beton 24.6642 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

53 1 M3 BETON SLOOF 15/20 (POS) 1.0000 M3 Beton K. 175 162.7757 Kg Besi beton 13.3332 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

54 1 M3 BETON RINGBALK 15/20 (POS) 1.0000 M3 Beton K. 175 162.7757 Kg Besi beton 13.3332 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

55 1 M3 BETON POER PLAT (P) 1.0000 M3 Beton K. 225 167.8573 Kg Besi beton 2.2222 M2 Bekisting

1 2 356 1 M3 BETON POER PLAT P.1

1.0000 M3 Beton K. 225 201.1738 Kg Besi beton 3.0000 M2 Bekisting

57 1 M3 BETON POER PLAT P.2 1.0000 M3 Beton K. 225 159.3944 Kg Besi beton 2.9682 M2 Bekisting

58 1 M3 BETON POER PLAT P.3 1.0000 M3 Beton K. 225 139.7745 Kg Besi beton 2.3323 M2 Bekisting

59 1 M3 BETON POER PLAT P.4

Page 95: Analis Cipta Karya 2012-8 FEB 2012

1.0000 M3 Beton K. 225 113.3843 Kg Besi beton 1.3162 M2 Bekisting

60 1 M3 BETON POER PLAT P.5 1.0000 M3 Beton K. 225 76.5739 Kg Besi beton 1.0577 M2 Bekisting

61 1 M3 BETON POER PLAT P.6 1.0000 M3 Beton K. 225 107.6388 Kg Besi beton 1.4852 M2 Bekisting

62 1 M3 BETON POER PLAT P.7 1.0000 M3 Beton K. 225 105.8564 Kg Besi beton 1.6660 M2 Bekisting

63 1 M3 BETON BALOK B.1 (30/60) 1.0000 M3 Beton K. 225 114.4600 Kg Besi beton 8.3330 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

64 1 M3 BETON BALOK B.2 (30/60) 1.0000 M3 Beton K. 225 136.5939 Kg Besi beton 8.3330 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

65 1 M3 BETON BALOK B.3 (30/60) 1.0000 M3 Beton K. 225 136.5939 Kg Besi beton 8.3330 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

66 1 M3 BETON BALOK B.4 (30/60) 1.0000 M3 Beton K. 225 114.4600 Kg Besi beton 8.3330 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

67 1 M3 BETON BALOK B.5 (30/60) 1.0000 M3 Beton K. 225 136.5939 Kg Besi beton 8.3330 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

Page 96: Analis Cipta Karya 2012-8 FEB 2012

68 1 M3 BETON BALOK B.6 (30/60) 1.0000 M3 Beton K. 225 130.3912 Kg Besi beton 8.3330 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

1 2 3

69 1 M3 BETON BALOK B.7 (30/60) 1.0000 M3 Beton K. 225 114.4600 Kg Besi beton 8.3330 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

70 1 M3 BETON BALOK B.8 (30/60) 1.0000 M3 Beton K. 225 192.4276 Kg Besi beton 8.3330 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

71 1 M3 BETON BALOK B.9 (30/60) 1.0000 M3 Beton K. 225 130.3912 Kg Besi beton 8.3330 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

72 1 M3 BETON BALOK B.10 (25/45) 1.0000 M3 Beton K. 225 163.1995 Kg Besi beton 10.2212 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

73 1 M3 BETON BALOK B.11 (30/60) 1.0000 M3 Beton K. 225 198.6313 Kg Besi beton 8.3330 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

74 1 M3 BETON BALOK B.12 (35/70) 1.0000 M3 Beton K. 225 194.9401 Kg Besi beton 7.1428 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

Page 97: Analis Cipta Karya 2012-8 FEB 2012

75 1 M3 BETON BALOK B.13 (25/45) 1.0000 M3 Beton K. 225 163.1995 Kg Besi beton 10.2212 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

76 1 M3 BETON BALOK B.14 (35/70) 1.0000 M3 Beton K. 225 172.1511 Kg Besi beton 7.1428 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

77 1 M3 BETON BALOK B.15 (30/60) 1.0000 M3 Beton K. 225 192.4276 Kg Besi beton 8.3330 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

78 1 M3 BETON BALOK B.16 (25/45) 1.0000 M3 Beton K. 225 120.2408 Kg Besi beton 10.2212 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

1 2 3

79 1 M3 BETON BALOK B.17 (20/30) 1.0000 M3 Beton K. 225 197.4333 Kg Besi beton 13.3328 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

80 1 M3 BETON BALOK B.18 (20/40) 1.0000 M3 Beton K. 225 168.7982 Kg Besi beton 12.5000 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

81 1 M3 BETON BALOK B.19 (30/60) 1.0000 M3 Beton K. 225 91.0823 Kg Besi beton 8.3330 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

Page 98: Analis Cipta Karya 2012-8 FEB 2012

82 1 M3 BETON BALOK B.20 (30/60) 1.0000 M3 Beton K. 225 115.7154 Kg Besi beton 8.3330 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

83 1 M3 BETON BALOK B.21 (35/70) 1.0000 M3 Beton K. 225 176.7090 Kg Besi beton 7.1428 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

84 1 M3 BETON BALOK B.22 (35/70) 1.0000 M3 Beton K. 225 153.9200 Kg Besi beton 7.1428 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

85 1 M3 BETON BALOK B.23 (30/60) 1.0000 M3 Beton K. 225 99.3730 Kg Besi beton 8.3330 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

86 1 M3 BETON BALOK B.24 (30/60) 1.0000 M3 Beton K. 225 108.0528 Kg Besi beton 8.3330 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

87 1 M3 BETON BALOK B.25 (30/60) 1.0000 M3 Beton K. 225 120.4654 Kg Besi beton 8.3330 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

88 1 M3 BETON BALOK B.26 (24/45) 1.0000 M3 Beton K. 225 157.2445 Kg Besi beton 10.2212 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

1 2 3

Page 99: Analis Cipta Karya 2012-8 FEB 2012

89 1 M3 BETON BALOK B.27 (24/45) 1.0000 M3 Beton K. 225 168.1620 Kg Besi beton 10.2212 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

90 1 M3 BETON BALOK B.28 (30/50) 1.0000 M3 Beton K. 225 146.5589 Kg Besi beton 8.6658 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

91 1 M3 BETON BALOK B.29 (30/50) 1.0000 M3 Beton K. 225 146.5589 Kg Besi beton 8.6658 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

92 1 M3 BETON BALOK B.30 (30/50) 1.0000 M3 Beton K. 225 113.0623 Kg Besi beton 8.6658 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

93 1 M3 BETON BALOK B.31 (30/50) 1.0000 M3 Beton K. 225 138.3708 Kg Besi beton 8.6658 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

94 1 M3 BETON RING BALK (RB. 1) 30/50 1.0000 M3 Beton K. 225 123.4834 Kg Besi beton 8.6658 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

95 1 M3 BETON RING BALK (RB. 2) 30/50 1.0000 M3 Beton K. 225 123.4834 Kg Besi beton 8.6658 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

96 1 M3 BETON RING BALK (RB. 3) 30/60 1.0000 M3 Beton K. 225 139.3912 Kg Besi beton 8.6658 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

Page 100: Analis Cipta Karya 2012-8 FEB 2012

97 1 M3 BETON RING BALK (RB. 4) 30/50 1.0000 M3 Beton K. 225 109.2935 Kg Besi beton 8.6658 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

98 1 M3 BETON RING BALK (RB. 5) 30/50 1.0000 M3 Beton K. 225 109.2935 Kg Besi beton 8.6658 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

1 2 3

99 1 M3 BETON RING BALK (RB. 6) 25/45 1.0000 M3 Beton K. 225 143.2782 Kg Besi beton 10.2212 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

100 1 M3 BETON RING BALK (RB. 7) 25/45 1.0000 M3 Beton K. 225 143.2782 Kg Besi beton 10.2212 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

101 1 M3 BETON RING BALK (RB. 8) 30/50 1.0000 M3 Beton K. 225 109.2900 Kg Besi beton 10.2212 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

102 1 M3 BETON RING BALK (RB. 9) 20/30 1.0000 M3 Beton K. 225 250.2080 Kg Besi beton 13.3328 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

103 1 M3 BETON RING BALK (RB. 10) 20/30 1.0000 M3 Beton K. 225 250.2080 Kg Besi beton 13.3328 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

Page 101: Analis Cipta Karya 2012-8 FEB 2012

104 1 M3 BETON RING BALK (RB. 11) 30/60 1.0000 M3 Beton K. 225 155.2058 Kg Besi beton 8.3330 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

105 1 M3 BETON RING BALK (RB. 12) 30/60 1.0000 M3 Beton K. 225 99.3730 Kg Besi beton 8.3330 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

106 1 M3 BETON RING BALK (RB. 13) 20/30 1.0000 M3 Beton K. 225 250.2080 Kg Besi beton 13.3328 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

107 1 M3 BETON RING BALK (RB. 14) 30/60 1.0000 M3 Beton K. 225 180.0203 Kg Besi beton 8.3330 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

108 1 M3 BETON RING BALK (RB. 15) 30/60 1.0000 M3 Beton K. 225 102.4748 Kg Besi beton 8.3330 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

1 2 3

109 1 M3 BETON RING BALK (RB. 16) 30/50 1.0000 M3 Beton K. 225 109.2935 Kg Besi beton 8.6658 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

110 1 M3 BETON RING BALK (RB. 17) 30/50 1.0000 M3 Beton K. 225 167.2157 Kg Besi beton 7.1428 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

Page 102: Analis Cipta Karya 2012-8 FEB 2012

111 1 M3 BETON RING BALK (RB. 18) 20/30 1.0000 M3 Beton K. 225 250.2080 Kg Besi beton 13.3328 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

112 1 M3 BETON RING BALK (RB. 19) 25/45 1.0000 M3 Beton K. 225 157.2445 Kg Besi beton 10.2212 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

58 1 M3 COR SPESIE 1 : 5 190.0000 Kg Semen Pc 0.8500 M3 Pasir cor 6.0000 o/h Pekerja 0.5000 o/h Tukang 0.0500 o/h Kepala tukang 0.3000 o/h Mandor

59 1 M3 LISTPLANK BETON 1.0000 M3 Beton K.175 102.3660 Kg Besi beton 10.0000 M2 Bekisting 0.7500 o/h Tukang bongkar

60 1 M3 SIRIP BETON 1.0000 M3 Beton K.175 125.1854 Kg Besi beton 8.3000 M2 Bekisting 0.7500 o/h Tukang bongkar

61 1 M3 PLAT BETON untuk TANGGA1.0000 M3 Beton K. 225

142.6700 Kg Besi beton8.5000 M2 Bekisting0.5000 o/h Tukang bongkar/siram

60 1 M3 PLAT LANTAI 1.0000 M3 Beton K. 225 152.4300 Kg Besi beton

Page 103: Analis Cipta Karya 2012-8 FEB 2012

8.3300 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

61 1 M3 PLAT ATAP BETON 1.0000 M3 Beton K. 225 142.6700 Kg Besi beton 10.0000 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

62 1 M' PEKERJAAN CANSTIN 0.1000 m3 Beton tumbuk K.100 0.8000 m2 Plesteran 0.8000 m2 Acian 0.8000 m2 Cat Minyak

63 1 M3 MEJA BETON (WASHTAFEL) 1.0000 M3 Beton K. 125 35.5500 Kg Besi beton 10.0000 M2 Bekisting 0.5000 o/h Tukang bongkar/siram

64 1 M2 PLESTERAN 1 PC : 2 PSR (Tebal 1,5 cm) 10.2240 Kg Semen 0.0200 m3 Pasir 0.3000 o/h Pekerja 0.1500 o/h Tukang batu 0.0150 o/h Kepala tukang 0.0150 o/h Mandor

1 2 3

65 1 M2 PLESTERAN 1 PC : 3 PSR (Tebal 1,5 cm) 7.7760 Kg Semen 0.0230 m3 Pasir 0.3000 o/h Pekerja

Page 104: Analis Cipta Karya 2012-8 FEB 2012

0.1500 o/h Tukang batu 0.0150 o/h Kepala tukang 0.0150 o/h Mandor

1 2 3

66 1 M2 ACIAN 3.2500 Kg Semen Pc 0.2000 o/h Pekerja 0.1000 o/h Tukang 0.0100 o/h Kepala tukang 0.0100 o/h Mandor

67 1 M2 PLESTERAN 1 PC : 4 PSR (Tebal 1,5 cm) 6.2400 Kg Semen 0.0240 m3 Pasir 0.3000 o/h Pekerja 0.1500 o/h Tukang batu 0.0150 o/h Kepala tukang 0.0150 o/h Mandor

68 1 M2 WATER PROOFING 2.9000 kg Water proofing 0.3000 o/h Pekerja 0.2000 o/h Tukang batu 0.0200 o/h Kepala tukang 0.0150 o/h Mandor

1 2 3

1 2 369 1 M' PASANGAN PLINT KERAMIK 10/60

0.6820 Bh Plint Keramik 10/60 cm 1.9200 Kg Semen 0.0090 M3 Pasir 0.3240 Kg Semen Warna 0.1400 o/h Pekerja 0.0700 o/h Tukang batu 0.0070 o/h Kepala tukang 0.0070 o/h Mandor

Page 105: Analis Cipta Karya 2012-8 FEB 2012

Jumlah Lt 1 x70 1 M' PASANGAN BORDER KERAMIK 6/20

5.3000 Bh List Keramik 6/20 cm 1.1400 Kg Semen 0.0030 M3 Pasir 0.1000 Kg Semen Warna 0.0900 o/h Pekerja 0.0900 o/h Tukang batu 0.0090 o/h Kepala tukang 0.0050 o/h Mandor

Jumlah Lt 1 x71 1 M2 PASANGAN DINDING KERAMIK 20/25

21.6000 Bh Tegel keramik 20/25 cm 9.3000 Kg Semen 0.0180 M3 Pasir 1.9400 Kg Semen Warna 0.9000 o/h Pekerja 0.4500 o/h Tukang batu 0.0450 o/h Kepala tukang 0.0450 o/h Mandor

Jumlah Lt 1

1 2 372 1 M2 PASANGAN LANTAI KERAMIK (Granito) 60/60 (SNI 7395:2008)

3.1000 Bh Keramik 60/60 cm 0.0450 M3 Pasir 9.6000 Kg Semen 1.6200 Kg Semen Warna 0.7000 o/h Pekerja 0.3500 o/h Tukang batu 0.0350 o/h Kepala tukang 0.0350 o/h Mandor

Jumlah Lt 1 Jumlah Lt 2 X

1 M 2 PASANG LANTAI GRANITO 60 x 60 1.0500 M2 Granito 60 x 60 cm 2.0000 Bh Pacu Pancing 60 x 230 12.4400 Kg Semen Portland 0.0250 M3 Pasir Pasang 1.5000 Kg Semen Warna 0.5200 h.o Pekerja 0.6500 h.o Tukang Batu 0.0650 h.o Kepala Tukang 0.0350 h.o Mandor

Jumlah Lt 3 X

Page 106: Analis Cipta Karya 2012-8 FEB 2012

1 2 373 1 M2 PASANG DINDING GRANIT 30/60

1.0600 M2 Granit 3.0030 Bh Paku 12 0.0250 M3 Pasir 12.4400 Kg Semen 0.6500 Kg Semen Warna 1.3000 o/h Pekerja 0.6500 o/h Tukang batu 0.0650 o/h Kepala tukang 0.0650 o/h Mandor

Jumlah Lt 1

74 1 M2 PASANGAN LANTAI KERAMIK 40/40 6.6300 Bh Keramik 40/40 cm 0.0450 M3 Pasir 8.1900 Kg Semen 1.6200 Kg Semen Warna 0.7000 o/h Pekerja 0.3500 o/h Tukang batu 0.0350 o/h Kepala tukang 0.0350 o/h Mandor

Jumlah Lt 1 x

75 1 M2 PASANGAN LANTAI KERAMIK 30/30 11.8700 Bh Keramik 30/30 cm 0.0450 M3 Pasir 10.0000 Kg Semen 1.5000 Kg Semen Warna 0.7000 o/h Pekerja 0.3500 o/h Tukang batu 0.0350 o/h Kepala tukang 0.0350 o/h Mandor

Jumlah Lt 1 x

76 1 M2 PASANGAN LANTAI KERAMIK 20/20 26.5000 Bh Keramik 20/20 cm 0.0450 M3 Pasir 10.4000 Kg Semen 1.6200 Kg Semen Warna 0.7000 o/h Pekerja 0.3500 o/h Tukang batu 0.0350 o/h Kepala tukang 0.0350 o/h Mandor

Jumlah Lt 1 x

77 1 M2 PASANG DINDING LOSTER KERAMIK 30/30

Page 107: Analis Cipta Karya 2012-8 FEB 2012

25.0000 Bh Loster Keramik 30/30 9.3000 Kg Semen Pc 0.0180 M3 Pasir Pasang 0.6000 o/h Pekerja 0.1000 o/h Tukang 0.0450 o/h Kepala Tukang 0.0300 o/h Mandor

Jumlah Lt 1 x

Jumlah Lt 2 XJumlah Lt 3 X

78 1 M2 PASANG STIKER SAND BLASTING 1.2000 M2 Stiker Sand Blasting 1.0000 Scht Perekat (sampo 250 mg) 0.0200 o/h Pekerja 0.2000 o/h Tukang 0.0200 o/h Kepala Tukang 0.0025 o/h Mandor

79 1 M2 PASANG WALLPAPER lebar 50 cm 2.2000 M' Wallpaper 0.2500 Kg Lem Wallpaper (perekat) 0.3500 o/h Pekerja 0.1750 o/h Tukang 0.0170 o/h Kepala Tukang 0.0020 o/h Mandor

80 1 M' PASANG BORDER WALLPAPER 1.2000 M' Border Wallpaper 0.1000 Kg Lem Wallpaper 0.2500 o/h Pekerja 0.2500 o/h Tukang 0.0250 o/h Kepala tukang

81 1 M2 PELABURAN BIDANG KAYU DENGAN VERNIS81 1 M2 0.15 Ltr Vernis

0.0500 Kg Dempul 0.1000 Lbr Amplas 0.0100 Bh Kuas 0.1600 H.o Pekerja 0.1600 H.o Tukang Cat 0.0160 H.o Kepala Tukang

0.0025 H.o Mandor

1 2 3

0.1500 Ltr Vernis

Page 108: Analis Cipta Karya 2012-8 FEB 2012

0.0500 Kg Dempul0.1000 Lbr Amplas0.0100 Bh Kuas0.1600 H.o Pekerja0.1600 H.o Tukang Cat0.0160 H.o Kepala Tukang0.0025 H.o Mandor

82 1 M' PEKERJAAN COMPOUND

1.2000 M' Plester "Cotton Tape"

0.4500 Kg Compound (2 x Lari )

0.0200 o/h Pekerja

0.0630 o/h Tukang

0.0063 o/h Kepala Tukang

0.0025 o/h Mandor

83 1 M2 CAT MINYAK (1 x Lapis Plamur Kayu, 1 x Cat Dasar, 3 x Cat Penutup)

0.2000 Kg Cat Meny 0.1500 Kg Plamur 0.1700 Kg Cat Dasar (Minyak) 0.3500 kg Cat minyak / Cat Penutup 0.2500 o/h Pekerja 0.2500 o/h Tukang cat 0.0250 o/h Kepala tukang 0.0010 o/h Mandor

84 1 M2 CAT PLAFON 0.1100 Kg Cat Plafon 0.0800 o/h Pekerja 0.1100 o/h Tukang cat 0.0110 o/h Kepala tukang 0.0050 o/h Mandor

1 2 3

85 1 M2 CAT DINDING TEMBOK BARU / DINDING DALAM(1 Lapis Plamir, 1 Lapis Cat Dasar, dan 2 lapis cat penutup)

0.1000 Kg Plamur 0.1000 Kg Cat Tembok Dasar 0.2600 Kg Cat Penutup 2 x 0.0200 o/h Pekerja 0.0630 o/h Tukang cat 0.0063 o/h Kepala tukang

Page 109: Analis Cipta Karya 2012-8 FEB 2012

0.0025 o/h Mandor 1.0000 Ls Alat Bantu (kuas, amplas, lem,

scafolding)Jumlah Lt 1

86 1 M2 CAT DINDING TEMBOK BARU / LUAR (DULUX)(1 Lapis Plamir, 1 Lapis Cat Dasar, dan 2 lapis cat penutup) 0.1000 Kg Plamur 0.1000 Kg Cat Tembok Luar (Dulux) 0.2600 Kg Cat Penutup 2 x 0.0200 o/h Pekerja 0.0630 o/h Tukang cat 0.0063 o/h Kepala tukang 0.0025 o/h Mandor 1.0000 Ls Alat Bantu (kuas, amplas, lem,

scafolding)

87 1 M2 CAT DASAR 0.3300 Ltr Cat Dasar / Meni 0.0100 Bh Kuas 0.0200 o/h Pekerja 0.2000 o/h Tukang cat 0.0200 o/h Kepala tukang 0.0100 o/h Mandor

88 1 M2 MENCAT DUCO 0.3500 Kg Cat Duco (Nippe) 0.2000 Kg Dempul Isamu Plastik 0.1700 Kg Cat Dasar Abu-abu 1.0000 Lbr Kertas Gosok 1.2500 Kg Thinner 0.3000 Kg Clear 1.0000 Ls Alat Bantu (Kompresor) 0.2500 o/h Pekerja 0.3500 o/h Tukang cat 0.0250 o/h Kepala tukang 0.0010 o/h Mandor

1 2 3

89 1 M2 CAT MELAMIN 0.4000 Kg Wood Filler 1.0000 Kg Thinner 0.3000 Kg Sending 0.3000 Kg Clear

Page 110: Analis Cipta Karya 2012-8 FEB 2012

0.5000 0.3000 Kg Pewarna 0.2000 Lbr Kertas gosok 0.2500 o/h Pekerja 0.2500 o/h Tukang 0.0250 o/h Kepala tukang 0.0010 o/h Mandor

90 1 M2 PEKERJAAN RANGKA DINDING PEMISAH / PARTISI (60 x 120) cm KAYU BESI 0.0280 M3 Balok kayu besi 5/10 0.1500 Kg Paku campur 0.1500 o/h Pekerja 0.4500 o/h Tukang 0.0450 o/h Kepala tukang 0.0080 o/h Mandor

91 1 M2 PEKERJAAN RANGKA DINDING Triplex/Dinding Hias60 x 120) cm 0.0160 M3 Balok kayu matoa

0.0804 Kg Paku campur0.0804 o/h Pekerja0.2411 o/h Tukang0.0129 o/h Kepala tukang0.0043 o/h Mandor

92 1 M2 PEKERJAAN RANGKA PLAFON 60/60 0.0163 M3 Balok kayu matoa 0.2500 Kg Paku campur 0.2000 o/h Pekerja 0.3000 o/h Tukang 0.0300 o/h Kepala tukang 0.0100 o/h Mandor

18 1 M2 PEKERJAAN RANGKA PLAFOND 1,00X1,00 M2, HOLLOW 40X40X1,2 MM 2.9360 Kg Hollow 40x40x3,2 mm 1.0000 set assessories 0.0900 o/h Pekerja 0.0150 o/h Tukang 0.0090 o/h Kepala Tukang 0.0005 o/h Mandor

18 1 M2 PEKERJAAN RANGKA PLAFOND 1,00X1,00 M2, HOLLOW 40X40X1,2 MM0.85 0.8500 Bttg Hollow steel 40x40x3,2 mm

1.0000 set assessories 0.0900 o/h Pekerja

Page 111: Analis Cipta Karya 2012-8 FEB 2012

0.0150 o/h Tukang 0.0090 o/h Kepala Tukang 0.0005 o/h Mandor

Lantai 2 xLantai 3 x

92 1 Kg PEKERJAAN BESI HOLLOW PADA RANGKA PLAFOND 1.1500 Kg Hollow 40x40x3.2 Mm 1.0000 Ls Bending dan Las 0.0800 Kg Meni Besi 0.0600 o/h Pekerja 0.0600 o/h Tukang 0.0060 o/h Kepala Tukang 0.0030 o/h Mandor 1.0000 Ls Alat Bantu

93 1 M2 PEKERJAAN RANGKA PLAFON KAYU 60/60 PADA DOME 0.0283 M3 Balok kayu matoa 0.4000 Kg Paku campur 1.0000 Ls Perlengkapan/pengikat 0.2700 o/h Pekerja 0.4050 o/h Tukang 0.0405 o/h Kepala tukang 0.0135 o/h Mandor

1 2 3

94 1 M2 PEKERJAAN PLAFON GYPSUM 0.8500 Btg Hollow steel 1.0000 Ls Penggantung 0.3640 Lbr Gypsum Board 0.0700 Doz Sekrup Gypsum 0.3300 o/h Pekerja 0.4186 o/h Tukang 0.0470 o/h Kepala Tukang 0.0155 o/h Mandor

1 2 3

Page 112: Analis Cipta Karya 2012-8 FEB 2012

Lantai 2 xLantai 3 x

95 1 M2 PEKERJAAN PLAFON GYPSUM (DOME) 0.8500 Btg Hollow steel 1.0000 Ls Perlengkapan/pengikat 0.3640 Lbr Gypsum Board 0.0700 Doz Sekrup Gypsum 0.4950 o/h Pekerja 0.6279 o/h Tukang 0.0705 o/h Kepala Tukang 0.0233 o/h Mandor 1.0000 Ls Alat Bantu

96 1 M2 PEKERJAAN PLAFON TRIPLEKS 6 MM 0.3360 Lbr Tripleks 6 mm 0.0200 Kg Paku Tripleks 0.1000 o/h Pekerja 0.0500 o/h Tukang 0.0050 o/h Kepala Tukang 0.0050 o/h Mandor

97 1 M2 PEKERJAAN DINDING TRIPLEKS 6 MM 0.3670 Lbr Tripleks 6 mm 0.2500 Kg Paku Tripleks 0.1000 o/h Pekerja 0.0500 o/h Tukang 0.0050 o/h Kepala Tukang 0.0050 o/h Mandor

Lantai 2 xLantai 3 x

98 1 M2 PEKERJAAN PLAFON LAMBERSERING 13.7500 M' List profil Lambersering 0.2500 Kg Paku campur 0.0210 o/h Pekerja 0.0210 o/h Tukang kayu 0.0020 o/h Kepala tukang 0.0010 o/h Mandor

Lantai 2 x Lantai 3 x

99 1 M2 PLAFON HIAS LAPIS SUNGKAI 0.3670 Lbr Sungkai

Page 113: Analis Cipta Karya 2012-8 FEB 2012

0.3600 Lbr Tripleks 6 mm 0.0200 Kg Paku Tripleks 0.2500 Kg Lem Fox kuning 0.0120 M3 Kayu Penggantung 0.1500 Kg Paku Campur 0.2800 o/h Pekerja 0.8000 o/h Tukang 0.0800 o/h Kepala Tukang 0.0140 o/h Mandor

100 1 M2 PLAFON HIAS LAPIS SUNGKAI (DOMB) 0.3670 Lbr Sungkai 0.3600 Lbr Tripleks 6 mm 0.0200 Kg Paku Tripleks 0.2500 Kg Lem Fox kuning 0.0120 M3 Kayu Penggantung 0.1500 Kg Paku Campur 0.3780 o/h Pekerja 1.0800 o/h Tukang 0.1080 o/h Kepala Tukang 0.0189 o/h Mandor 1.0000 Ls Alat Bantu

101 1 M2 PEKERJAAN DINDING GYPSUM BOARD 9 MM/SATU SISI 0.3640 Lbr Gypsum Board 0.1100 Kg Sekrup Gypsum 0.1000 o/h Pekerja 0.0500 o/h Tukang 0.0050 o/h Kepala Tukang 0.0050 o/h Mandor

Lantai 2 xLantai 3 x

102 1 M' PEKERJAAN LIST PLAFON PROFIL 1.2000 m' List Plafon 0.0100 kg Paku 0.0500 o/h Pekerja 0.0500 o/h Tukang kayu 0.0050 o/h Kepala tukang 0.0030 o/h Mandor

103 1 M' PEKERJAAN LIST PLAFON KAYU PROFIL LURUS 1.2000 m' List Plafon 5 cm 0.0100 kg Paku 0.0500 o/h Pekerja 0.0500 o/h Tukang kayu 0.0050 o/h Kepala tukang 0.0030 o/h Mandor

Page 114: Analis Cipta Karya 2012-8 FEB 2012

104 1 M' PEKERJAAN LIST PLAFON KAYU PROFIL LURUS 1.2000 m' List Plafon 4 cm 0.0100 kg Paku 0.0500 o/h Pekerja 0.0500 o/h Tukang kayu 0.0050 o/h Kepala tukang 0.0030 o/h Mandor

1 2 3.00

105 1 M' PEKERJAAN LIST PROFIL DINDING 1.2000 m' List Profil Dinding 0.1000 Kg Paku Campur 0.0500 o/h Pekerja 0.0500 o/h Tukang Kayu 0.0050 o/h Kepala Tukang 0.0030 o/h Mandor

106 1 M' PEKERJAAN LIST PLINT KAYU 1.0500 m' List Plint Kayu 0.0100 kg Paku 0.0500 o/h Pekerja 0.0500 o/h Tukang kayu 0.0050 o/h Kepala tukang 0.0030 o/h Mandor

1 2 3

107 1 M' PEKERJAAN LIST KODOK 1.0500 m' List Kodok 0.0100 kg Paku 0.0500 o/h Pekerja 0.0500 o/h Tukang kayu 0.0050 o/h Kepala tukang 0.0030 o/h Mandor

108 1 M' PEKERJAAN LIST LD 3 Cm 1.0500 m' List LD 3 cm

Page 115: Analis Cipta Karya 2012-8 FEB 2012

0.0100 kg Paku 0.0500 o/h Pekerja 0.0500 o/h Tukang kayu 0.0050 o/h Kepala tukang 0.0030 o/h Mandor

1 2 3

109 1 M3 KUSEN, PINTU DAN JENDELA (Kayu Besi) 1.1000 M3 Balok kayu besi 5/10 1.2500 Kg Paku campur 1.0000 Kg Lem Kayu (Lem Fox Putih) 7.0000 o/h Pekerja 21.0000 o/h Tukang 2.1000 o/h Kepala tukang 0.3500 o/h Mandor

110 1 M2 RANGKA KAYU PINTU / JENDELA KACA 0.0240 M3 Papan Kayu Besi 0.3000 Kg Lem Kayu (Lem Fox Putih) 0.8000 o/h Pekerja 2.4000 o/h Tukang 0.2400 o/h Kepala tukang 0.0400 o/h Mandor

111 1 M2 RANGKA DAUN JENDELA + KACA POLOS 1.0000 M3 Rangka kayu 1.0000 M2 Kaca polos 5 mm

1 2 3

112 1 M2 JENDELA KACA MATI 1.1000 M2 Kaca polos 5 mm 0.0150 o/h Pekerja 0.1500 o/h Tukang 0.0150 o/h Kepala tukang 0.00075 o/h Mandor

Page 116: Analis Cipta Karya 2012-8 FEB 2012

113 1 M2 PASANG PINTU PANIL KACA (BENING) 0.0240 M3 Papan Kayu Besi 1.1000 M2 Kaca bening 5 mm 0.3000 Kg Lem Kayu (Lem Fox Putih) 0.3000 o/h Pekerja 2.4000 o/h Tukang 0.2400 o/h Kepala tukang 0.0400 o/h Mandor

114 1 M2 DAUN PINTU PANIL KAYU 0.0400 M3 Papan Kayu Besi 0.5000 Kg Lem Kayu (Lem Fox Putih) 1.0000 o/h Pekerja 3.0000 o/h Tukang 0.3000 o/h Kepala tukang 0.0500 o/h Mandor

115 1 M2 PINTU dan JENDELA JALUSI 0.0640 M3 Papan Kayu Besi 0.5000 Kg Lem Kayu (Lem Fox Putih) 1.0000 o/h Pekerja 3.0000 o/h Tukang 0.3000 o/h Kepala tukang 0.0500 o/h Mandor

116 1 M2 PEKERJAAN VERGOLA KAYU 0.0150 M3 Papan Kayu Besi 0.5000 Kg Lem Kayu (Lem Fox Putih) 1.2800 M2 Finising Kayu 1.0500 m2 Polycarbonat 0.2500 Kg Paku campur 1.0000 o/h Pekerja 3.0000 o/h Tukang 0.3000 o/h Kepala tukang 0.0500 o/h Mandor

117 1 Daun PINTU KACA tebal 12 mm 1.7850 m2 Kaca Polos 1.0000 o/h Pekerja 3.0000 o/h Tukang 0.3000 o/h Kepala Tukang 0.0500 o/h Mandor

118 1 M' PASANG KUSEN ALUMUNIUM

Page 117: Analis Cipta Karya 2012-8 FEB 2012

1.1000 m' Profil Alumunium 2.0000 bh Sekrup Fixer 0.0600 Tbg Sealant 0.0430 o/h Pekerja 0.0430 o/h Tukang Khusus Alumunium 0.0043 o/h Kepala tukang 0.0021 o/h Mandor

119 1 M2 PASANG KACA tebal 6 mm 1.1000 m2 Kaca Polos 0.0430 o/h Pekerja 0.0430 o/h Tukang 0.0043 o/h Kepala Tukang 0.0021 o/h Mandor

1 2 3

120 1 Unit PINTU PANIL YANG DIUKIR KHAS PAPUA 2.0400 m2 Pintu Panil Kayu 4.0800 m2 Ukiran Khas Papua 4.0800 m2 Cat Melamin

121 I Unit PINTU UTAMA dan JENDELA KACA ALUMUNIUMLAPIS GRANIT 10.5900 m2 Pasang Dinding Granit 29.6000 m' Kusen Alumunium 29.6000 m' Karet Skoning 7.2300 m2 Kaca Polos 6 mm 2.0000 daun Pintu Kaca Tebal 12 mm 2.0000 Psg Flooring + Asesoris 2.0000 Psg Handle Stainless 2.0000 Bh Kunci

122 I Set PASANG PINTU PANIL UKIRAN dan GERBANGLAPIS GRANIT (PU. 2) 14.4000 m2 Pasang Dinding Granit 7.2000 m2 Pintu Panil yang diukir 12.0000 Bh Engsel Pintu Stainless Steel 2.0000 set Kunci Tanam 4.0000 Psg Handle Pintu 2.0000 Psg Grendel Tanam 4.0000 set Door Closer

Page 118: Analis Cipta Karya 2012-8 FEB 2012

123 1 M2 PINTU KM/W DOUBLE TEAKWOOD LAPISALUMUNIUM (210 x 72) 0.0250 M3 Papan Kayu Besi 0.5000 Kg Lem Kayu (Lem Fox Putih) 0.0300 Kg Paku Campur 1.0000 Lbr Teakwood ukuran 90 x 220 cm 0.5000 Lbr Plat Alumunium 90 x 220 cm 0.8000 o/h Pekerja 2.4000 o/h Tukang 0.2400 o/h Kepala tukang 0.0400 o/h Mandor

124 1 M2 PINTU DOUBLE TEAKWOOD (pintu shaft)(150 x 82) 0.0250 M3 Papan Kayu Besi 0.5000 Kg Lem Kayu (Lem Fox Putih) 0.0300 Kg Paku Campur 1.0000 Lbr Teakwood ukuran 90 x 220 cm 0.8000 o/h Pekerja 2.4000 o/h Tukang 0.2400 o/h Kepala tukang 0.0400 o/h Mandor

125 1 Unit PINTU RAK LEMARI DIBAWAH MEJA 0.2400 M2 Pintu Panil 4.0000 Bh Engsel 2.0000 Bh Grendel 1.0000 Bh Kunci Gembok 2.0000 Bh Tarikan 0.5400 M2 Cat Minyak

1 2 3

126 1 Set PASANG PINTU HARMONIKA 1.0000 Set Pintu Harmonika 0.5000 Dos Kawat Las 8.0000 Jam Mesin Las 2.0000 Psg Handle 1.0000 Bh Kunci 2.0000 Bh Gembok 0.0360 M3 Cor 1 : 3 : 5 sekitar Kusen 0.6000 M2 Acian sekitar Kusen 0.6000 M2 Plesteran sekitar Kusen 6.0000 o/h Pekerja 8.0000 o/h Tukang 0.8000 o/h Kepala tukang 0.2000 o/h Mandor

127 1 M2 PASANG TERALIS BESI STRIP 2 x 3 mm

Page 119: Analis Cipta Karya 2012-8 FEB 2012

6.1770 Kg Besi Strip 27.0280 Cm Pengelasan 1.6700 o/h Pekerja 1.6700 o/h Tukang 0.0167 o/h Kepala tukang 0.0830 o/h Mandor

128 1 Unit PINTU BESI pada RUANG PANEL 1.5000 Btg Besi Kotak 4 cm 1.2000 Btg Besi Kotak 2 cm 0.2750 Lbr Besi Plat 3 mm 1.1000 Btg Besi Beton Ø 12 mm 1.0000 Set Kunci + Gembok 368.0000 Cm Pengelasan 1.6700 o/h Pekerja 1.6700 o/h Tukang 0.0167 o/h Kepala tukang 0.0830 o/h Mandor

129 1 M3 MEMASANG KONSTRUKSI KUDA-KUDA KONVENSIONAL(Bentangan lebih 6 m')

1.1000 m3 Balok kayu besi 5/10 15.0000 Kg Besi Strip tebal 5 mm 5.6000 Kg Paku campur 4.0000 o/h Pekerja 12.0000 o/h Tukang 1.2000 o/h Kepala Tukang 0.2000 o/h Mandor

130 1 M3 MEMASANG KONSTRUKSI KUDA-KUDA EXPOSE 1.2000 m3 Balok kayu besi 5/10

15.0000 Kg Besi Strip tebal 5 mm 5.6000 Kg Paku campur 6.7000 o/h Pekerja 20.1000 o/h Tukang 2.0100 o/h Kepala Tukang 0.3350 o/h Mandor

Page 120: Analis Cipta Karya 2012-8 FEB 2012

1 2 3

131 1 M3 MEMASANG KONSTRUKSI GORDING 1.1000 m3 Balok kayu besi 15.0000 Kg Besi Strip tebal 5 mm 3.0000 Kg Paku campur 2.4000 o/h Pekerja 7.2000 o/h Tukang 0.7200 o/h Kepala Tukang 0.1200 o/h Mandor

132 1 M3 MEMASANG KONSTRUKSI GORDING 1.1000 m3 Balok Kayu Matoa 15.0000 Kg Besi Strip tebal 5 mm 3.0000 Kg Paku campur 2.4000 o/h Pekerja 7.2000 o/h Tukang 0.7200 o/h Kepala Tukang 0.1200 o/h Mandor

135 1 M2 PASANG PELAPIS ALUMUNIUM FOIL 1.0500 M2 Alumunium Foil 0.1500 o/h Pekerja 0.0500 o/h Tukang 0.0050 o/h Kepala Tukang 0.0080 o/h Mandor

136 1 M2 PEKERJAAN GLASS WALL + KAWAT RAM 1.0500 M2 Glass Wall 1.0500 M2 Kawat Ram 0.1500 o/h Pekerja 0.0500 o/h Tukang 0.0050 o/h Kepala Tukang 0.0080 o/h Mandor

133 1 M2 PASANG ATAP ALUMUNIUM (SPANDEK/SUPER DEK) 1.3125 Lbr Atap Super Deck (type lebar 80 cm) 0.0200 Kg Paku Atap 0.1500 o/h Pekerja 0.7500 o/h Tukang 0.0080 o/h Kepala tukang 0.0060 o/h Mandor

1 1 M2 PEKERJAAN MULTIPLEKS 12 MM Pelapis Atap 0.3360 Lbr Tripleks 12 mm

Page 121: Analis Cipta Karya 2012-8 FEB 2012

0.0200 Kg Paku Tripleks 0.2000 Kg Paku Biasa 1/2" - 1" 10.0000 Bj Sekrup Baja 0.1250 Btg Vinil J Channel 0.1000 o/h Pekerja 0.0500 o/h Tukang 0.0050 o/h Kepala Tukang 0.0050 o/h Mandor 1.0000 Ls Alat Bantu

136 I M2 PASANG ATAP GENTENG shingles (Owens) 3.0500 Bdl Genteng Shingles Per Sguare 0.1500 H.o Pekerja

0.2000 H.o Tukuang Kayu 0.0200 H.o Kepala Tukang 0.0015 H.o Mandor 1.0000 Ls Alat Bantu

137 1 M2 PEMASANGAN WATERPROOFING MEMBRANE 2.9000 kg Membrane 0.3000 o/h Pekerja 0.2000 o/h Tukang Kayu 0.0200 o/h Kepala tukang 0.0150 o/h Mandor 1.0000 Ls Alat Bantu

138 1 M2 PASANG PAVING BLOCK 57.0000 Bh Paving Block 0.1000 M3 Pasir Pasang 0.3000 Oh Pekerja 0.2000 Oh Tukang Batu 0.0200 Oh Kepala Tukang 0.0020 Oh Mandor

134 1 M' PASANG NOK ATAP ALUMUNIUM (SPANDEK/SUPER DEK 1.2000 M' Nok Atap 0.0400 Kg Paku Atap 0.1000 o/h Pekerja 1.0000 o/h Tukang 0.0100 o/h Kepala Tukang

Page 122: Analis Cipta Karya 2012-8 FEB 2012

0.0100 o/h Mandor

137 1 Kg RANGKA KUDA-KUDA BAJA IWF 1.1500 Kg Besi Baja IWF 0.0600 o/h Pekerja 0.0600 o/h Tukang besi 0.0060 o/h Kepala Tukang 0.0030 o/h Mandor

1 2 3

138 1 Kg PEKERJAAN GORDING CANAL 1.1500 Kg Gording Canal 0.0600 o/h Pekerja 0.0600 o/h Tukang 0.0060 o/h Kepala Tukang 0.0030 o/h Mandor

139 100 Kg PEKERJAAN PERAKITAN KUDA-KUDA BAJA 1.0000 Ltr Solar 0.1000 Ltr Minyak Pelumas 0.1000 o/h Pekerja 0.1000 o/h Tukang 0.0010 o/h Kepala Tukang 0.0050 o/h Mandor 0.8000 Jam Sewa Alat

140 1 Kg PEKERJAAN KUDA-KUDA BAJA 1.0000 Kg Besi Baja (IWF/Siku) 1.0000 Kg Perakitan

141 I Unit UPAH SETTING KUDA-KUDA BAJA 3.9650 m3 Balok Kayu Matoa

9.9125 kg Paku Campur 24.0000 o/h Pekerja

4.0000 o/h Tukang Las 6.0000 o/h Tukang Kayu 2.0000 o/h Kepala Tukang 0.6000 Ls Mandor

142 1 M' PAPAN LISTPLANK KAYU BESI 3/30

Page 123: Analis Cipta Karya 2012-8 FEB 2012

0.0110 M3 Papan kayu besi 0.0500 Kg Paku Campur 0.1000 o/h Pekerja 0.2000 o/h Tukang 0.0200 o/h Kepala tukang 0.0050 o/h Mandor

143 1 M2 PASANG PAVING BLOCK 57.0000 Bh Paving Block 0.1000 M3 Pasir Pasang 0.3000 Oh Pekerja 0.2000 Oh Tukang Batu 0.0200 Oh Kepala Tukang 0.0020 Oh Mandor

144 10 CM PENGELASAN DENGAN LAS LISTRIK 0.4000 Dos Kawat Las Listrik 0.3000 Ltr Solar 0.0400 Ltr Minyak Pelumas 0.0400 o/h Pekerja 0.0200 o/h Tukang 0.0020 o/h Kepala tukang 0.0020 o/h Mandor 0.1700 Jam Sewa Alat

145 1 M' PEKERJAAN TRUNKING CABLE 4.0000 Kg Besi Siku 40.40.3

1.9000 Kg Besi Beton dia. 10 8.0000 Cm Pengelasan

0.5600 o/h Pekerja 0.5600 o/h Tukang 0.0560 o/h Kepala tukang 0.0083 o/h Mandor

146 1 M' PASANG RAILING TANGGA STAINLESS 0.3990 m' Pipa Stainless Ø 3 " 1.0000 m' Pipa Stainless Ø 2 ½ "

11.7500 m' Pipa Stainless Ø 1 " 0.1570 bh Ring Kaki Ø 3 " 10.0000 bh Ring Kaki Ø 1 " 0.1578 bh Bola Ø 4 "

Page 124: Analis Cipta Karya 2012-8 FEB 2012

0.3157 bh Cincin Ø 3 " 15.0000 bh Cincin Ø 1 " 10.0000 bh Dina Bolt 279.7500 cm Pengelasan

1.2000 o/h Pekerja 1.2000 o/h Tukang 0.1200 o/h Kepala tukang 0.0060 o/h Mandor

147 1 M' PASANG RAILING BALKON STAINLESS 1.1000 m' Pipa Stainless Ø 2 ½ " 0.5000 m' Pipa Stainless Ø 2 " 0.1570 bh Ring Kaki Ø 2 " 2.0000 bh Dina Bolt 39.5000 cm Pengelasan 1.2000 o/h Pekerja 1.2000 o/h Tukang 0.1200 o/h Kepala tukang 0.0060 o/h Mandor

148 1 M' PAGAR STAINLESS STEEL 2.4000 m' Pipa Stainless Ø 2 " 6.3000 m' Pipa Stainless Ø 1 ½ " 1.2000 m' Pipa Stainless Ø ½ " 171.3000 cm Pengelasan 1.6700 o/h Pekerja 1.6700 o/h Tukang 0.1670 o/h Kepala tukang 0.0830 o/h Mandor

149 1 Unit PINTU GERBANG STAINLESS STEEL (Panjang 4,25 m) 8.9250 m' Pipa Stainless Ø 2 " 26.7750 m' Pipa Stainless Ø 1 ½ " 5.1000 m' Pipa Stainless Ø ½ " 1.0000 lbr Plat Stainless (Double) 3.0000 bh Roda 928.0000 cm Pengelasan 7.0975 o/h Pekerja 7.0975 o/h Tukang 0.7097 o/h Kepala tukang 0.3527 o/h Mandor

150 1 M' SALURAN Type 1 (Tepi Pagar) 0.4095 m3 Galian Tanah 0.1023 m3 Urugan Tanah kembali

Page 125: Analis Cipta Karya 2012-8 FEB 2012

0.0300 m3 Pasir Urug 0.0900 m3 Pondasi Batu Kali 0.0400 m3 Cor Lantai Rabat 1.6000 m2 Plesteran 1 : 3 1.0000 m2 Acian

151 1 M' SALURAN Type 2 (dari Halaman ke Saluran type 1) 0.2500 m3 Galian Tanah 0.0625 m3 Urugan Tanah kembali 0.0250 m3 Pasir Urug 0.2250 m3 Cor Rabat Bertulang 0.8000 m2 Bekisting Dinding Cor 1.2000 m2 Plesteran 1 : 3 1.2000 m2 Plesteran Beton 48.9780 kg Besi Grill (Penutup saluran)

152 1 M' SALURAN DITEPI JALAN Type 3 0.9600 m3 Galian Tanah 0.2400 m3 Urugan Tanah kembali 0.1200 m3 Pasir Urug 0.2400 m3 Lapisan Batu Kosong 0.4800 m3 Pondasi Batu Gunung 0.1200 m3 Cor Lantai Rabat 3.0000 m2 Plesteran 1 : 3 3.0000 m2 Acian

153 1 M' PASANG KAWAT DURI pada PAGAR KELILING 1.2000 m' Besi Siku 50.50.5 7.7000 m' Kawat Duri 0.4000 m2 Cat Minyak pada Besi Siku

154 1 M' PROFIL BETON LIST PLANK 12.50000 Kg Semen PC 25.0000 Bh Paku beton 0.0010 M3 Pasir pasang 0.7500 o/h Pekerja 1.0000 o/h Tukang 0.5000 o/h Kepala tukang 0.1000 o/h Mandor

155 1 M' PEKERJAAN SALURAN KELILING BANGUNAN 0.1000 m3 Cor Rabat 1 Pc : 3 Psr : 5 Krl 2.2000 m2 Plesteran 1 Pc : 3 Psr 2.2000 m2 Acian

Page 126: Analis Cipta Karya 2012-8 FEB 2012

156 1 M' PEK. SALURAN PEMBUANGAN KE RIOL KOTA 0.2500 m3 Beton bertulang 1.7000 m2 Plesteran 1 Pc : 3 Psr

157 1 Unit PEKERJAAN SEPTICTANK & REMBESAN 21.3650 M3 Galian tanah 6.4095 M3 Urugan tanah kembali

0.3800 M3 Urugan Pasir 1.2190 M3 Pasangan Pondasi Batu Kali 1 : 4

2.2240 M3 Pasangan Tembok 1 pc : 4 psr 0.2180 M3 Cor rabat 1 pc : 3 psr : 5 krl 0.5500 M3 Sloof, Kolom, Ringbalk

0.4200 M3 Beton Plat Penutup 25.0000 M2 Plesteran 1 pc : 2 psr

0.4480 M3 Urugan Kerikil 0.5220 M3 Pekerjaan Ijuk 4.0000 M' Pipa PVC Ø 4 " 1.0000 Bh Pipa Udara Gip. Ø 2 "

158 1 M2 PEKERJAAN LAPISAN BATU PECAH 5/7 0.0600 M3 Batu Pecah 5/7 0.2000 o/h Pekerja 0.0190 o/h Mandor 0.0045 hari Mesin Gilas (Wales)

159 1 M3 PEKERJAAN LAPISAN SIRTU 1.2000 M3 Sirtu 0.3000 o/h Pekerja 0.0100 o/h Mandor 0.0045 hari Mesin Gilas (Wales)

1 2 3

160 100 M2 PEKERJAAN LAPISAN PENETRASI (LAPEN) tebal 6 cm 3.6000 M3 Batu Pecah 3/5 2.4000 M3 Batu Pecah 2/3 1.2000 M3 Batu Pecah 1/2 2.0000 M3 Pasir Pasang 120.0000 Kg Aspal 1.0000 M3 Kayu Bakar 7.5000 o/h Pekerja

Page 127: Analis Cipta Karya 2012-8 FEB 2012

0.3750 o/h Mandor 0.6600 hari Mesin Gilas (Wales)

161 1 UNIT GROUND RESERVOAR BAWAH WING KANAN BANGUNAN 14.0000 M3 Galian Tanah Pondasi / Bak 1.2000 M3 Urugan Tanah kembali 2.1200 M3 Pondasi Poer Plat 0.3600 M3 Sloof Beton Bertulang 15/20 0.2160 M3 Kolom Beton Bertulang 25/25 3.6800 M3 Plat Dinding & Lantai tebal 10 cm 0.8000 M3 Plat Penutup tebal 12 cm 0.2880 M3 Balok Beton 20/30 0.8000 M3 Lantai Cor 1 : 3 : 5 tebal 10 cm 8.0000 M2 Plester pada Plat Lantai 36.8000 M2 Plesteran Bak Air 32.0000 M2 Pasang Keramik 20/20 1.0000 Unit Tangga Besi turun ke Reservoar 1.0000 Unit Pintu Besi Bak Kontrol 50/50 + Acc

162 100 M2 LAPISAN ASPAL GORENG tebal 3 cm (LATASIR) 0.8000 M3 Abu Batu / Filter 2.4000 M3 Batu Pecah 2/3 1.2000 M3 Batu Pecah 1/2 2.0000 M3 Pasir Kasar 120.0000 Kg Aspal 1.0000 M3 Kayu Bakar 7.5000 o/h Pekerja 0.3750 o/h Mandor 0.6600 hari Mesin Gilas (Wales)

163 1 Unit KUDA-KUDA PIPA dia. 3 " (K. 5) 18.0000 M' Pipa Gip dia. 3 "

2.0000 Bh Besi Plat Dudukan Kuda-kuda 0.4000 Bh Besi Plat Penghubung Dudukan 8.0000 Bh Baut Anker Dudukan Kuda-kuda 1.0000 Dos Kawat Las 8.0000 Jam Sewa Mesin Las 3.0000 o/h Pekerja 4.0000 o/h Tukang 0.4000 o/h Kepala Tukang 0.1000 o/h Mandor

164 1 Unit KUDA-KUDA PIPA dia. 2 " (K. 4) 15.0000 M' Pipa Gip dia. 2 "

2.0000 Bh Besi Plat Dudukan Kuda-kuda 4.0000 Bh Baut Anker Dudukan Kuda-kuda 0.7500 Dos Kawat Las

Page 128: Analis Cipta Karya 2012-8 FEB 2012

6.0000 Jam Sewa Mesin Las 2.5000 o/h Pekerja 3.0000 o/h Tukang 0.3000 o/h Kepala Tukang 0.1000 o/h Mandor

165 1 M' GORDING PIPA MEDIUM dia. 1 ½ " 1.0500 M' Pipa Gip dia. 1 ½ "

0.2000 o/h Pekerja 0.2000 o/h Tukang 0.0200 o/h Kepala Tukang 0.0010 o/h Mandor

166 1 M2 PASANG ATAP POLYCARBONAT 1.1000 M' Atap Polycarbonat 0.2500 Tbg Silent 12.0000 Bh Sekrup 0.1500 o/h Pekerja 0.2000 o/h Tukang 0.0250 o/h Kepala tukang 0.0050 o/h Mandor

1 2 3

167 1 M' PEKERJAAN PIPA GIP Ø ½ " 1.2000 M' Pipa Gip Ø ½ "

% Perlengkapan (35 % Harga Pipa) 0.0540 o/h Pekerja 0.0900 o/h Tukang 0.0090 o/h Kepala Tukang 0.0270 o/h Mandor

168 1 M' PEKERJAAN PIPA GIP Ø ¾ " 1.2000 M' Pipa Gip Ø ¾ "

% Perlengkapan (35 % Harga Pipa) 0.0540 o/h Pekerja 0.0900 o/h Tukang

Page 129: Analis Cipta Karya 2012-8 FEB 2012

0.0090 o/h Kepala Tukang 0.0270 o/h Mandor

169 1 M' PEKERJAAN PIPA GIP Ø 1 " 1.2000 M' Pipa Gip Ø 1 "

% Perlengkapan (35 % Harga Pipa) 0.0540 o/h Pekerja 0.0900 o/h Tukang 0.0090 o/h Kepala Tukang 0.0270 o/h Mandor

170 1 M' PEKERJAAN PIPA GIP Ø 1 ¼ " 1.2000 M' Pipa Gip Ø 1 ¼ "

% Perlengkapan (35 % Harga Pipa) 0.1080 o/h Pekerja 0.1800 o/h Tukang 0.0180 o/h Kepala Tukang 0.0054 o/h Mandor

171 1 M' PEKERJAAN PIPA GIP Ø 1 ½ " 1.2000 M' Pipa Gip Ø 1 ½ "

% Perlengkapan (35 % Harga Pipa) 0.1080 o/h Pekerja 0.1800 o/h Tukang 0.0180 o/h Kepala Tukang 0.0054 o/h Mandor

172 1 M' PEKERJAAN PIPA GIP Ø 2 " 1.2000 M' Pipa Gip Ø 2 "

% Perlengkapan (35 % Harga Pipa) 0.1080 o/h Pekerja 0.1800 o/h Tukang 0.0180 o/h Kepala Tukang 0.0054 o/h Mandor

173 1 M' PEKERJAAN PIPA GIP Ø 3 " 1.2000 M' Pipa Gip Ø 3 "

% Perlengkapan (35 % Harga Pipa) 0.1080 o/h Pekerja 0.1800 o/h Tukang 0.0180 o/h Kepala Tukang 0.0054 o/h Mandor

174 1 M' PEKERJAAN PIPA GIP Ø 4 " 1.2000 M' Pipa Gip Ø 4 "

% Perlengkapan (35 % Harga Pipa) 0.1350 o/h Pekerja

Page 130: Analis Cipta Karya 2012-8 FEB 2012

0.2250 o/h Tukang 0.0225 o/h Kepala Tukang 0.0068 o/h Mandor

175 1 M' PEKERJAAN PIPA PVC Ø 6 " 1.2000 M' Pipa PVC Ø 6 "

% Perlengkapan (35 % Harga Pipa) 0.0810 o/h Pekerja 0.1350 o/h Tukang 0.0135 o/h Kepala Tukang 0.0041 o/h Mandor

176 1 M' PEKERJAAN PIPA PVC Ø 4 " 1.2000 M' Pipa PVC Ø 4 "

% Perlengkapan (35 % Harga Pipa) 0.0810 o/h Pekerja 0.1350 o/h Tukang 0.0135 o/h Kepala Tukang 0.0041 o/h Mandor

177 1 M' PEKERJAAN PIPA PVC Ø 3 " 1.2000 M' Pipa PVC Ø 3 "

% Perlengkapan (35 % Harga Pipa) 0.0810 o/h Pekerja 0.1350 o/h Tukang 0.0135 o/h Kepala Tukang 0.0041 o/h Mandor

178 1 M' PEKERJAAN PIPA PVC Ø 2 " 1.2000 M' Pipa PVC Ø 2 "

% Perlengkapan (35 % Harga Pipa) 0.0540 o/h Pekerja 0.0900 o/h Tukang 0.0090 o/h Kepala Tukang 0.0027 o/h Mandor

179 1 M' PEKERJAAN PIPA PVC Ø 1 ½ " 1.2000 M' Pipa PVC Ø 1 ½ "

% Perlengkapan (35 % Harga Pipa) 0.0360 o/h Pekerja 0.0660 o/h Tukang 0.0060 o/h Kepala Tukang 0.0018 o/h Mandor

180 1 M' PEKERJAAN PIPA PVC Ø 1 " 1.2000 M' Pipa PVC Ø 1 "

% Perlengkapan (35 % Harga Pipa) 0.0360 o/h Pekerja 0.0600 o/h Tukang 0.0060 o/h Kepala Tukang 0.0018 o/h Mandor

Page 131: Analis Cipta Karya 2012-8 FEB 2012

181 1 Set POMPA AIR MANCUR + INSTALASI

84.2000 m' Pipa PVC (AW) dia. 2 "

15.0000 m' Pipa Gip dia. ¾ "

3.0000 bh Nozzle Air Mancur (keatas)

6.0000 bh Nozzle Air Mancur (ke kolam)

2.0000 unit Pompa (Pressure Pump)

110.2000

253.a 1 UNIT PEMBUATAN KOLAM AIR MANCUR

1 98.1944 M3 Galian Tanah

2 14.2523 M3 Urugan Pasir

3 1.2724 M3 Sloof Beton Bertulang 15/20

4 58.0521 M3 Pas Batu Kali

5 52.7564 M3 Lantai Cor 1 : 3 : 5 tebal 7 cm

6 33.9313 M2 Plester 1;2

7 111.9906 m2 Keramik Lantai 20/20

8 45.0447 M2 Pasang dinding 20/25

9 48.8406 m Kanstin beton

181 All IN PEK. INSTALASI PIPA AIR BERSIH Lantai 1 (Total 210 m) 18.00 m Pipa GIP medium Ø 1 ¼ " 12.00 m Pipa GIP medium Ø 2 " 25.00 m Pipa GIP medium Ø 1 " 35.00 m Pipa GIP medium Ø ¾ " 120.00 m Pipa GIP medium Ø ½ " 12.00 bh Knie GIP Ø 1 ½ " 15.00 bh Knie GIP Ø 1 " 90.00 bh Knie GIP Ø ½ " 2.00 bh Testik GIP Ø 2 " 5.00 bh Testik GIP Ø 1 ½ " 7.00 bh Testik GIP Ø 1 ½ " x ¾ " 10.00 bh Testik GIP Ø 1 " x ½ " 35.00 bh Testik GIP Ø ½ " 7.00 bh Sock GIP Ø 1 ½ " 10.00 bh Sock GIP Ø 1 " 20.00 bh Sock GIP Ø ½ " 5.00 bh Double Nepple Ø 1 ½ " 7.00 bh Double Nepple Ø 1 " 50.00 bh Double Nepple Ø ½ " 3.00 bh Over sock GIP Ø 1 ½ " x 1 " 5.00 bh Over sock GIP Ø 1 " x ½ " 2.00 bh Over sock GIP Ø 2 " x 1 ½ " 4.00 bh Water Mor Ø 2 " 4.00 bh Water Mor Ø 1 ½ " 5.00 bh Water Mor Ø 1 " 25.00 bh Water Mor Ø ½ " 2.00 bh Boult Valve Ø 1 ½ " 1.00 bh Boult Valve Ø 2 "

Page 132: Analis Cipta Karya 2012-8 FEB 2012

182 All IN PEK. INSTALASI PIPA AIR BERSIH Lantai 2 45.00 m Pipa GIP mediumØ 1 ¼ " 75.00 m Pipa GIP mediumØ 1 " 315.00 m Pipa GIP mediumØ ½ " 10.00 bh Knie GIP Ø 1 ¼ " 17.00 bh Knie GIP Ø 1 " 200.00 bh Knie GIP Ø ½ " 7.00 bh Testik GIP Ø 1 ¼ " x 1 " 12.00 bh Testik GIP Ø 1 " x ½ " 30.00 bh Testik GIP Ø ½ " 10.00 bh Sock GIP Ø 1 ¼ " 20.00 bh Sock GIP Ø 1 " 40.00 bh Sock GIP Ø ½ " 10.00 bh Double Nepple Ø 1 ¼ " 15.00 bh Double Nepple Ø 1 " 30.00 bh Double Nepple Ø ½ " 3.00 bh Over sock GIP Ø 1 ½ " x 1 " 2.00 bh Over sock GIP Ø 1 " x ½ " 4.00 bh Water Mor Ø 1 ¼ " 6.00 bh Water Mor Ø 1 " 30.00 bh Water Mor Ø ½ " 2.00 bh Boult Valve Ø 1 ¼ " 70.00 dos Seal tape

183 All IN PEK. INSTALASI PIPA AIR BERSIH Lantai 3 25.00 m Pipa GIP mediumØ 3 " 6.00 m Pipa GIP mediumØ 1 ¼ " 12.00 m Pipa GIP mediumØ 1 " 70.00 m Pipa GIP mediumØ ½ " 6.00 bh Knie GIP Ø 1 ¼ " x ½ " 10.00 bh Knie GIP Ø 1 " 35.00 bh Knie GIP Ø ½ " 2.00 bh Testik GIP Ø 2 " 10.00 bh Testik GIP Ø 1 " x ½ " 15.00 bh Testik GIP Ø ½ " 2.00 bh Sock GIP Ø 1 ¼ " 3.00 bh Sock GIP Ø 1 " 15.00 bh Sock GIP Ø ½ " 5.00 bh Double Nepple Ø 1 ¼ " 7.00 bh Double Nepple Ø 1 " 12.00 bh Double Nepple Ø ½ " 3.00 bh Over sock GIP Ø 1 ¼ " x 1 " 4.00 bh Over sock GIP Ø 1 " x ½ " 2.00 bh Water Mor Ø 2 " 4.00 bh Water Mor Ø 1 " 15.00 bh Water Mor Ø ½ " 2.00 bh Boult Valve Ø 3 " 1.00 bh Boult Valve Ø 1 ¼ " 50.00 dos Seal tape

Page 133: Analis Cipta Karya 2012-8 FEB 2012

184 All IN PEK. INSTALASI PIPA AIR KOTOR Lantai 1 80.00 m Pipa PVC AW Ø 4 " 70.00 m Pipa PVC AW Ø 3 " 30.00 m Pipa PVC AW Ø 2 " 12.00 m Pipa PVC AW Ø 1 ½ " 12.00 m Pipa PVC AW Ø 1 " 35.00 bh Knie PVC Ø 4 " 20.00 bh Knie PVC Ø 2 " 10.00 bh Knie PVC Ø 1 ½ " 40.00 bh Knie PVC Ø 1 " 10.00 bh Testik PVC Ø 4 " x 2 " 8.00 bh Ty 90 º Ø 4 " 12.00 bh Ty 90 º Ø 2 " 8.00 bh Ty 90 º Ø 4 " x 2 " 5.00 bh Over sock PVC Ø 4 " x 2 " 5.00 bh Over sock PVC Ø 2 " x 1 ½ " 6.00 bh Over sock PVC Ø 2 " x 1 " 15.00 bh Knie PVC 45 º Ø 4 " 20.00 bh Knie PVC 45 º Ø 2 " 30.00 bh Knie PVC type D Ø 3 " 10.00 bh Testik PVC type Ø 3 " 3.00 klg Lem Pipa PVC merk Wavin 500 Gram

1 2 3

185 All IN PEK. INSTALASI PIPA AIR KOTOR Lantai 2 350.00 m Pipa PVC AW Ø 4 " 100.00 m Ø 3 " 120.00 m Ø 2 " 80.00 m Ø 1 ½ " 25.00 m Ø 1 " 50.00 bh Knie PVC Ø 3 " 75.00 bh Ø 2 " 25.00 bh Ø 1 ½ " 30.00 bh Ø 1 " 37.00 bh Testik PVC Ø 4 " x 2 " 15.00 bh Ø 4 " 15.00 bh Ø 3 " x 2 " 20.00 bh Ø 1 ½ " 12.00 bh Ty 90 º Ø 4 " 20.00 bh Ø 2 " 25.00 bh Ø 3 " x 2 " 10.00 bh Over sock PVC Ø 3 " x 2 " 15.00 bh Ø 2 " x 1 ½ " 10.00 bh Ø 2 " x 1 " 15.00 bh Knie PVC 45 º Ø 4 "

Page 134: Analis Cipta Karya 2012-8 FEB 2012

25.00 bh Ø 2 " 30.00 bh Shock Drat Dala Ø 2 " 45.00 bh Knie PVC type D Ø 3 " 25.00 bh Testik PVC type Ø 3 " 10.00 klg Lem Pipa PVC merk Wavin 500 Gram

186 All IN PEK. INSTALASI PIPA AIR KOTOR Lantai 3 30.00 m Pipa PVC AW Ø 4 " 15.00 m Type D Ø 3 " 25.00 m Type D Ø 2 " 8.00 m Type D Ø 1 ½ " 4.00 m Type D Ø 1 " 20.00 bh Knie PVC Ø 3 " 20.00 bh Knie PVC Ø 2 " 10.00 bh Knie PVC Ø 1 ½ " 5.00 bh Knie PVC Ø 1 " 2.00 bh Testik PVC Ø 4 " x 2 " 3.00 bh Ty 90 º Ø 4 " 4.00 bh Ty 90 º Ø 3 " x 2 " 3.00 bh Ty 90 º Ø 1 ½ " 2.00 bh Over sock PVC Ø 4 " 4.00 bh Over sock PVC Ø 2 " 2.00 bh Over sock PVC Ø 3 " x 2 " 4.00 bh Knie PVC 45 º Ø 3 " x 2 " 6.00 bh Knie PVC 45 º Ø 2 " x 1 ½ " 6.00 bh Knie PVC 45 º Ø 2 " x 1 " 5.00 bh Shock Drat Dala Ø 4 " 6.00 bh Knie PVC type D Ø 2 " 2.00 bh Testik PVC type Ø 2 "

187 1 Set KUNCI TANAM 1.0000 Bh Kunci Tanam 0.0600 o/h Pekerja 0.6000 o/h Tukang 0.0600 o/h Kepala Tukang 0.0030 o/h Mandor

188 1 Set KUNCI TANAM RUANGAN 1.0000 Bh Kunci Pintu Ruangan

0.0100 o/h Pekerja0.5000 o/h Tukang0.0100 o/h Kepala Tukang0.0050 o/h Mandor

189 1 Bh PASANG KUNCI CYLINDER

Page 135: Analis Cipta Karya 2012-8 FEB 2012

1.0000 Bh Kunci Cylinder0.0050 o/h Pekerja0.5000 o/h Tukang Kayu0.0050 o/h Kepala tukang

0.00025 o/h Mandor

190 1 Bh HAK ANGIN 1.0000 Bh Hak Angin0.0150 o/h Pekerja0.1500 o/h Tukang0.0150 o/h Kepala Tukang

0.00075 o/h Mandor

191 1 Bh ENGSEL PINTU 1.0000 Bh Engsel Pintu0.0150 o/h Pekerja0.1500 o/h Tukang0.0150 o/h Kepala Tukang

0.00075 o/h Mandor

192 1 Bh ENGSEL PINTU1.0000 Bh Engsel Pintu0.0150 o/h Pekerja0.1500 o/h Tukang0.0150 o/h Kepala Tukang

0.00075 o/h Mandor

193 1 Psg GRENDEL + GEMBOK PINTU 1.0000 Bh Grendel 1.0000 Bh Gembok 0.0150 Oh Pakerja 0.1500 Oh Tukang Kayu 0.0150 Oh Kepala Tukang Kayu 0.00075 Oh Mandor

194 1 Bh ENGSEL JENDELA 1.0000 Bh Engsel Jendela0.0100 o/h Pekerja0.1000 o/h Tukang0.0100 o/h Kepala Tukang0.0005 o/h Mandor

195 1 Bh GRENDEL JENDELA 1.0000 Bh Grendel Jendela 0.0150 Oh Pakerja 0.1500 Oh Tukang Kayu 0.0150 Oh Kepala Tukang Kayu

Page 136: Analis Cipta Karya 2012-8 FEB 2012

0.00075 Oh Mandor

196 1 Psg PASANG GRENDEL PINTU DOUBLE 1.0000 Psg Grendel Pintu Double 0.0100 o/h Pekerja 0.5000 o/h Tukang Kayu 0.1000 o/h Kepala tukang 0.0050 o/h Mandor

197 1 Psg PASANG HANDLE PINTU DOUBLE 1.0000 Psg Handle Pintu Double 0.0150 o/h Pekerja 0.1500 o/h Tukang Kayu 0.0150 o/h Kepala tukang 0.00075 o/h Mandor

198 1 Bh PASANG DOOR CLOSER 1.0000 Bh Door Closer 0.0500 o/h Pekerja 0.5000 o/h Tukang Kayu 0.0500 o/h Kepala tukang 0.00250 o/h Mandor

199 1 Bh PASANG DOOR STOP 1.0000 Bh Door Stop 0.0100 o/h Pekerja 0.1000 o/h Tukang Kayu 0.0100 o/h Kepala tukang 0.0005 o/h Mandor

200 1 Bh PASANG CLOSED DUDUK 1.0000 Bh Closed Duduk

% Perlengkapan (6 % Harga Closed) 3.3000 o/h Pekerja 1.1000 o/h Tukang 0.0010 o/h Kepala Tukang 0.1600 o/h Mandor

201 1 Bh KLOSET JONGKOK 1.0000 Bh Kloset Jongkok 7.0000 Bh Batu Tela 6.0000 Kg Semen 0.0100 M3 Pasir Pasang 1.0000 o/h Pekerja 1.5000 o/h Tukang 0.3000 o/h Kepala Tukang

Page 137: Analis Cipta Karya 2012-8 FEB 2012

0.1100 o/h Mandor

1 2 3

202 1 Bh PASANG BATH TUB 1.0000 Bh Bath Tub

% Perlengkapan (20 % Harga Bak Tub) - o/h Pekerja 0.0750 o/h Tukang 0.7500 o/h Kepala Tukang 0.2500 o/h Mandor

203 1 Bh PASANG WASHTAFEL MEJA 1.0000 Bh Washatfel Meja

% Perlengkapan (12 % Harga Washtafel 6.0000 Kg Semen 0.0100 M3 Pasir Pasang 1.2000 o/h Pekerja 1.4500 o/h Tukang 0.1500 o/h Kepala Tukang 0.1000 o/h Mandor

204 1 Bh PASANG WASHTAFEL GANTUNG 1.0000 Bh Washatfel Gantung

% Perlengkapan (12 % Harga Washtafel 6.0000 Kg Semen 0.0100 M3 Pasir Pasang 1.2000 o/h Pekerja 1.4500 o/h Tukang 0.1500 o/h Kepala Tukang 0.1000 o/h Mandor

205 1 Set PASANG WATER HEATER 1.0000 Set Water Heater

% Perlengkapan (6 % Harga Heater) - o/h Pekerja 0.0750 o/h Tukang 0.7500 o/h Kepala Tukang 0.2500 o/h Mandor

206 1 Unit PASANG TANGKI FIBER GLASS cap 1.5 M3 1.0000 Unit Fiber Glass

% Perlengkapan (12 % Harga Heater) 1.8000 o/h Pekerja 2.7000 o/h Tukang 0.5400 o/h Kepala Tukang

Page 138: Analis Cipta Karya 2012-8 FEB 2012

0.1100 o/h Mandor

207 1 Bh PASANG FLOOR DRAIN 1.0000 Bh Floor Drain

% Perlengkapan (12 % Harga F.Drain) 1.6500 o/h Pekerja 0.5500 o/h Tukang 0.0055 o/h Kepala Tukang 0.0800 o/h Mandor

208 1 Bh PASANG URINOIR 1.0000 Bh Urinoir

% Perlengkapan (30 % Harga Urinoir) 6.0000 Kg Semen 0.0100 M3 Pasir Pasang 1.0000 o/h Pekerja 1.0000 o/h Tukang 0.1000 o/h Kepala Tukang 0.1000 o/h Mandor

1 2 3

209 1 Unit PASANG POMPA HISAP 1.0000 Set Pompa Hisap

% Perlengkapan (6 % Harga Pompa) 1.8000 o/h Pekerja 2.7000 o/h Tukang 0.5400 o/h Kepala Tukang 0.1100 o/h Mandor

210 1 Unit PASANG POMPA TEKAN 1.0000 Set Pompa Tekan

% Perlengkapan (6 % Harga Pompa) 1.8000 o/h Pekerja 2.7000 o/h Tukang 0.5400 o/h Kepala Tukang 0.1100 o/h Mandor

211 1 m PEKERJAAN SUMUR BOR 1.1000 M Pipa PVC Ø 6 '' 1.1000 m Pipa Gip Ø 1 " 1.1000 m Pipa Gip Ø 1 ¼ "

0.6000 m3 Pekerjaan Tanah 1.0000 unt Sewa alat 1.0000 o/h Pekerja 0.7746 o/h Tukang

Page 139: Analis Cipta Karya 2012-8 FEB 2012

0.5000 o/h Kepala tukang 0.0500 o/h Mandor

212 1 Unit MEMASANG 1 BUAH TUTUP MEN HOLE SUMUR BOR 0.6240 M³ Galian Tanah 0.0480 M³ Urugan Pasir 0.1000 M³ Urugan Kerikil 1.6800 M2 Pasang Bekisting 1.6800 M³ Beton 1 : 2 : 3 0.2500 H.o Plesteran 1 : 2 +Acian 1.0000 Ls Penutup Plat Besi + Rangka

213 1 TITIK INSTALASI LAMPU / PENERANGAN 4.5000 m Kabel NYM 3 X 2,5 mm2 10.0000 m Kabel NYM 2 X 2,5 mm2 5.0000 m Pipa PVC Clipsal 3/4" 3.5000 m Pipa PVC Maspion 5/8" 2.0000 bh T.Doos PVC 3/4 2.0000 bh Elbo PVC Clipsal 4.0000 bh Klem PVC Clipsal 1.0000 bh Sock PVC Clipsal 3/4 3.0000 bh Las Dop Legrand 4 mm2 0.2500 Rol Isolasi Unibel 0.7500 o/h Pekerja 0.5000 o/h Tukang Listrik 0.0500 o/h Kepala Tukang 0.0100 o/h Mandor

214 1 TITIK INSTALASI STOP KONTAK / POWER OUTLET 12.0000 m Kabel NYM 3 x 2,5 mm2 12.0000 m Pipa PVC Clipsal 3/4" 3.5000 m Pipa PVC Maspion 5/8 2.0000 bh T.Doos PVC 3/4 2.0000 bh Elbo PVC Clipsal 4.0000 bh Klem PVC Clipsal 3.0000 bh Sock PVC Clipsal 3/4 3.0000 bh Las Dop Legrand 4 mm2 0.2500 Rol Isolasi Unibel 0.7500 o/h Pekerja 0.5000 o/h Tukang Listrik 0.0500 o/h Kepala Tukang 0.0100 o/h Mandor

215 1 TITIK INSTALASI AC 1 PHASE 30.0000 m Kabel NYM 3 x 4 mm2 30.0000 m Pipa Clipsal PVC 3/4 2.0000 bh Elbo Clipsal PVC 3/4 10.0000 bh Sock PVC Clipsal 3/4 30.0000 bh Klem Clipsal PVC 3/4

Page 140: Analis Cipta Karya 2012-8 FEB 2012

0.7500 o/h Pekerja 0.5000 o/h Tukang Listrik 0.0500 o/h Kepala Tukang 0.0100 o/h Mandor

216 1 TITIK INSTALASI AC 3 PHASE 30.0000 m Kabel NYM 4 x 4 mm2 30.0000 m Pipa Clipsal PVC 3/4 2.0000 bh Elbo Clipsal PVC 3/4 10.0000 bh Sock PVC Clipsal 3/4 30.0000 bh Klem Clipsal PVC 3/4 0.7500 o/h Pekerja 0.5000 o/h Tukang Listrik 0.0500 o/h Kepala Tukang 0.0100 o/h Mandor

217 1 TITIK INSTALASI SOUND SYSTEM 12.0000 m Kabel NYM HY 3 X 2,5 mm2 12.0000 m Pipa PVC Clipsal 3/4" 5.0000 m Pipa PVC Maspion 5/8" 2.0000 bh T.Doos PVC 3/4 2.0000 bh Elbo PVC Clipsal 3/4 12.0000 bh Klem PVC Clipsal 3/4 3.0000 bh Sock PVC Clipsal 3/4 3.0000 bh Las Dop Legrand 4 mm2 0.2500 Rol Isolasi Unibel 0.7500 o/h Pekerja 0.5000 o/h Tukang Listrik 0.0500 o/h Kepala Tukang 0.0100 o/h Mandor

218 1 TITIK INSTALASI TELEPHONE 35.0000 m Kabel ITC 2 x 2 x 0.6 mm2 35.0000 m Pipa PVC Clipsal 3/4" 5.0000 m Pipa PVC Maspion 5/8 1.0000 bh T.Doos PVC 3/4 3.0000 bh Elbo PVC Clipsal 12.0000 bh Klem PVC Clipsal 10.0000 bh Sock PVC Clipsal 3/4 0.7500 o/h Pekerja 0.5000 o/h Tukang Listrik 0.0500 o/h Kepala Tukang 0.0100 o/h Mandor

7

219 1 TITIK INSTALASI FIRE ALARM 15.0000 m Kabel NYM 2 X 2,5 mm2 15.0000 m Pipa PVC Clipsal 3/4" 1.0000 bh T.Doos PVC 3/4

Page 141: Analis Cipta Karya 2012-8 FEB 2012

2.0000 bh Elbo PVC Clipsal 7.0000 bh Klem PVC Clipsal 5.0000 bh Sock PVC Clipsal 3/4 2.0000 bh Las Dop Legrand 4 mm2 0.2500 Rol Isolasi Unibel 0.7500 o/h Pekerja 0.5000 o/h Tukang Listrik 0.0500 o/h Kepala Tukang 0.0100 o/h Mandor

1 2 3220 1 Set GROUNDING PENTANAHAN

3.0000 m' Pipa Gip Ø 2 " 2.0000 o/h Kawat BC 2,5 mm 3.0000 o/h Kabel BC 50 mm 1.0000 o/h Box Pengaman Pasangan Batu Tela 1.0000 o/h Upah Kerja

1 2 3

221 1 M3 GALIAN TANAH dan URUGAN PASIR pada KABELFEEDER / INSTALASI LAMPU JALAN 1.0000 m3 Galian Tanah 0.3000 m3 Pasir Urug 0.6440 m3 Urugan Tanah kembali

222 1 M3 URUGAN TANAH SUBUR 1.2000 M3 Tanah Subur 0.3000 o/h Pekerja 0.0100 o/h Mandor

222 1 M2 TANAM RUMPUT HALAMAN 1.1000 M2 Rumput Halaman 0.5000 Kg Pupuk (TSP) 0.0200 o/h Pekerja 0.2000 o/h Tukang 0.0200 o/h Kepala Tukang 0.0100 o/h Mandor 1.0000 Ls Pemeliharaan selama 1 bulan

223 1 Phn TANAM PALEM RAJA 1.0000 Phn Palem Raja

Page 142: Analis Cipta Karya 2012-8 FEB 2012

1.0000 Kg Pupuk (TSP) 0.5000 o/h Pekerja 0.2500 o/h Tukang 0.0250 o/h Kepala Tukang 0.0100 o/h Mandor 1.0000 Ls Pemeliharaan selama 1 bulan

224 1 Phn TANAM PALEM BOTOL 1.0000 Phn Palem Botol 1.0000 Kg Pupuk (TSP) 0.5000 o/h Pekerja 0.2500 o/h Tukang 0.0250 o/h Kepala Tukang 0.0100 o/h Mandor 1.0000 Ls Pemeliharaan selama 1 bulan

1 2 3

225 1 Phn TANAM CEMARA 1.0000 Phn Cemara 1.0000 Kg Pupuk (TSP) 0.5000 o/h Pekerja 0.2500 o/h Tukang 0.0250 o/h Kepala Tukang 0.0100 o/h Mandor 1.0000 Ls Pemeliharaan selama 1 bulan

226 1 M2 PASANG DINDING BATU ALAM 1.0600 M2 Batu alam Palimanan/Batu Candi 3.0030 Bh Paku 12 0.0250 M3 Pasir 12.4400 Kg Semen 0.6500 Kg Semen Warna 1.3000 o/h Pekerja 0.6500 o/h Tukang batu 0.0650 o/h Kepala tukang 0.0650 o/h Mandor

240 1 M 2 PASANG DINDING BATU ALAM ANDHESIT 1.0500 M2 Batu Andhesit 11.7500 Kg Semen Portland 0.0350 M3 Pasir Pasang 0.7200 h.o Pekerja 0.3800 h.o Tukang Batu 0.0350 h.o Kepala Tukang 0.0300 h.o Mandor

Page 143: Analis Cipta Karya 2012-8 FEB 2012

241 1 M 2 PASANG DINDING BATU ALAM CANDI 1.0500 M2 Batu Alam Candi 11.7500 Kg Semen Portland 0.0350 M3 Pasir Pasang 0.7200 h.o Pekerja 0.3800 h.o Tukang Batu 0.0350 h.o Kepala Tukang 0.0300 h.o Mandor

242 1 M2 PASANG ALUCOBOND FLAFOND ENTRANCE 1.1000 M2 Alucobond 0.4500 Tb Sealant

3.5000 Kg Besi Siku 40.40.3 8.0000 Cm Pengelasan 8.0000 Bj Ree fet 0.5600 o/h Pekerja 0.5600 o/h Tukang batu 0.0560 o/h Kepala tukang 0.0083 o/h Mandor

243 1 UNIT PEMBUATAN Pembuatan stage Ruang Sidang 90.6867 M3 Urugan tanah 1.8619 M3 Urugan Pasir 8.6209 M3 Pas Dinding bata 27.0000 m Kolom Praktis 51.3900 m Ring Balk Praktis 5.1515 M3 Lantai Cor 1 : 3 : 5 tebal 7 cm 114.9448 M2 Plester 1;3 114.9448 m2 Acian 93.7900 M2 Lantai Keramik 60x60 (Granitto) 28.5750 m2 Keramik tangga (Granitto) 1.0000 Ls Pek. Finising & Assesories

244 1 M 2 PASANG DINDING BATU ALAM ANDHESIT 1.0500 M2 Batu Andhesit 11.7500 Kg Semen Portland 0.0350 M3 Pasir Pasang 0.7200 h.o Pekerja 0.3800 h.o Tukang Batu 0.0350 h.o Kepala Tukang 0.0300 h.o Mandor

245 1 M 2 PASANG DINDING BATU ALAM LIMESTONE 1.0500 M2 Batu Alam Limestone 11.7500 Kg Semen Portland

Page 144: Analis Cipta Karya 2012-8 FEB 2012

0.0350 M3 Pasir Pasang 0.7200 h.o Pekerja 0.3800 h.o Tukang Batu 0.0350 h.o Kepala Tukang 0.0300 h.o Mandor

245 1 M 2 PASANG DINDING BATU ALAM CANDI 1.0500 M2 Batu Alam Candi 11.7500 Kg Semen Portland 0.0350 M3 Pasir Pasang 0.7200 h.o Pekerja 0.3800 h.o Tukang Batu 0.0350 h.o Kepala Tukang 0.0300 h.o Mandor

246 1 M 2 PASANG DINDING BATU ANDHESIT SUSUN SIRIH 1.0500 M2 Batu Andhesit Susun Sirih 11.7500 Kg Semen Portland 0.0350 M3 Pasir Pasang 0.7200 h.o Pekerja 0.3800 h.o Tukang Batu 0.0350 h.o Kepala Tukang 0.0300 h.o Mandor

247 1 M 2 PASANG BATU KORAL SIKAT 1.0500 M2 Batu koral sikat 11.7500 Kg Semen Portland 0.0350 M3 Pasir Pasang 0.5000 h.o Pekerja 0.3800 h.o Tukang Batu 0.0350 h.o Kepala Tukang 0.0300 h.o Mandor

248 1 M 2 FLOOR HARDENER FERROVAX 3.0000 Kg Floor Hardener Ferrovax 0.1200 h.o Pekerja 0.1200 h.o Tukang Batu 0.0120 h.o Kepala Tukang 0.0060 h.o Mandor

249 1 M Pas. Tembok garfus atap lantai 3 0.0405 m3 Pas Tela 0.7400 M2 Plester 1;3 0.7400 m2 Acian

Page 145: Analis Cipta Karya 2012-8 FEB 2012

250 1 M Pembesaran Kolom Ø 30cm 0.2700 m3 Pas Tela 2.2000 M2 Plester 1;3 2.2000 m2 Acian

251 1 M Pembesaran Kolom Ø 45cm 0.1700 m3 Pas Tela 2.2000 M2 Plester 1;3 2.2000 m2 Acian

252 1 M' PROFIL BETON LIST LEBAR 10 Cm12.5000 Kg Semen PC25.0000 Bh Paku beton

0.0128 M3 Pasir pasang0.7500 o/h Pekerja1.0000 o/h Tukang0.5000 o/h Kepala tukang0.1000 o/h Mandor

LEBAR 15 cmLEBAR 20 cmLEBAR 30 cm

253 1 UNIT PROFIL PADA KOLOM 45 Cm1.8134 m2 Pasangan Batu Tela 1 : 21.0362 m2 Plesteran 1 : 2 + Acian

20.0000 bh Paku Beton Angkur Batu Tela1.7270 m List Profil dia. 55 cm Lebar 10 Cm1.7270 m List Profil dia. 55 cm Lebar 15 Cm2.0410 m List Profil dia. 65 cm Lebar 20 Cm2.0410 m List Profil Bawah dia. 65 cm Lebar 30 Cm

254 1 m' FLASHING ALCUBOUND PADA ATAP LANTAI 031.5000 m2 Alcubound2.2000 m' Besi Siku 4x4x2 mm1.0000 tube Sealent

16.0000 cm Pengelasan

0.1100 Dos Rifeat

4.0000 Bh Dinabolt

0.3520 Bh Meni Besi

0.7500 o/h Pekerja1.0000 o/h Tukang0.5000 o/h Kepala tukang

Page 146: Analis Cipta Karya 2012-8 FEB 2012

0.0750 o/h Mandor

255 1 m PEMBUNGKUS PIPA AIR HUJAN PADA KOLOM 45 CM0.0518 m3 Beton K-1750.7500 m2 Plesteran 1 : 2 + Acian3.0000 Kg Besi Beton0.0450 Kg Kawat0.7500 m2 Bekisting

2.0410 Ls Alat bantu (Scafolding, dll)

256 1 Unit PEKERJAAN ORNAMEN FIBER1.000 Unit Ornamen Fiber0.480 Klg Lem8.000 Bh Paku Beton1.000 Ls Cat Duco1.000 Ls Biaya Pemasangan

1 1 Unit PEMASANGAN SPLIT AC 1 PK 1.0000 Set Ac Panasonik Split 1 PK 15.0000 m Pipa Tembaga 1/4" 15.0000 m Pipa PVC 3/4 5.0000 bh Elbo PVC 3/4 10.0000 bh Sock PVC 3/4 0.2500 Tb Lem Pipa 30.0000 bh Klem Clipsal PVC 3/4 0.5000 Btl Freon Merk DUPON

1.000 Ls Biaya alat dan Pemasangan

1 1 Unit PEMASANGAN SPLIT AC 1,5 PK 1.0000 Set Ac Panasonik Split 1,5 PK 15.0000 m Pipa Tembaga 5/16"

15.0000 m Pipa PVC 3/4 2.0000 bh Elbo PVC 3/4 10.0000 bh Sock PVC 3/4 0.5000 Tb Lem Pipa 30.0000 bh Klem Clipsal PVC 3/4 0.7500 Btl Freon Merk DUPON

1.000 Ls Biaya alat dan Pemasangan

1 1 Unit PEMASANGAN SPLIT AC 2 PK 1.0000 Set Ac Panasonik Split 2 PK 15.0000 m Pipa Tembaga 3/"8"

15.0000 m Pipa PVC 3/4 5.0000 bh Elbo PVC 3/4 10.0000 bh Sock PVC 3/4 0.5000 Tb Lem Pipa 30.0000 bh Klem Clipsal PVC 3/4 1.0000 Btl Freon Merk DUPON

Page 147: Analis Cipta Karya 2012-8 FEB 2012

1.000 Ls Biaya alat dan Pemasangan

1 1 Unit PEMASANGAN AC cassette 5 PK 1.0000 Set Ac Panasonik Cassette 5 PK 15.0000 m Pipa Tembaga 1/2" 15.0000 m Pipa PVC 3/4 5.0000 bh Elbo PVC 3/4 10.0000 bh Sock PVC 3/4 0.5000 Tb Lem Pipa 30.0000 bh Klem Clipsal PVC 3/4 1.0000 Btl Freon Merk DUPON

1.000 Ls Biaya alat dan Pemasangan

1 1 Unit PEMASANGAN AC Floor Standing 5 PK 1.0000 Set Ac Panasonik Cassette 5 PK 15.0000 m Pipa Tembaga 1/2" 15.0000 m Pipa PVC 3/4 5.0000 bh Elbo PVC 3/4 10.0000 bh Sock PVC 3/4 0.5000 Tb Lem Pipa 30.0000 bh Klem Clipsal PVC 3/4 1.0000 Btl Freon Merk DUPON

1.000 Ls Biaya alat dan Pemasangan

Page 148: Analis Cipta Karya 2012-8 FEB 2012

902,163,554.22

ANALISA HARGA SATUAN PEKERJAAN 287,676,391.32

: PEMBANGUNAN GEDUNG DPRD - KABUPATEN MIMIKA (TAHAP III)

HARGA JUMLAHSATUAN ( Rp) HARGA (Rp) BHN UPH

3 4

2,180,000.00 65,400.00 65,400.00

1,600.00 4,000.00 4,000.00

75,000.00 90,000.00 90,000.00

245,000.00 1,225.00 1,225.00

250,000.00 2,250.00 2,250.00

2,180,000.00 156,960.00 156,960.00

21,000.00 1,260.00 1,260.00

80,000.00 32,000.00 32,000.00

110,000.00 22,000.00 22,000.00

120,000.00 2,400.00 2,400.00

125,000.00 2,500.00 2,500.00

Jumlah 379,995.00 321,095.00 58,900.00

2,180,000.00 130,800.00 130,800.00

2,180,000.00 601,680.00 601,680.00

21,000.00 14,700.00 14,700.00

75,000.00 112,500.00 112,500.00

80,000.00 80,000.00 80,000.00

110,000.00 165,000.00 165,000.00

120,000.00 18,000.00 18,000.00

125,000.00 6,250.00 6,250.00

Jumlah 1,128,930.00 859,680.00 269,250.00

2,180,000.00 26,160.00 26,160.00

21,000.00 420.00 420.00

2,180,000.00 15,260.00 15,260.00

80,000.00 8,000.00 8,000.00

110,000.00 11,000.00 11,000.00

120,000.00 1,200.00 1,200.00

125,000.00 625.00 625.00

Jumlah 62,665.00 41,840.00 20,825.00

80,000.00 60,000.00 60,000.00

125,000.00 3,125.00 3,125.00

Page 149: Analis Cipta Karya 2012-8 FEB 2012

Jumlah 63,125.00 - 63,125.00

80,000.00 120,000.00 120,000.00

125,000.00 7,500.00 7,500.00

Jumlah 127,500.00 - 127,500.00

80,000.00 20,000.00 20,000.00

125,000.00 1,041.67 1,041.67

Jumlah 21,041.67 - 21,041.67

80,000.00 20,000.00 20,000.00

125,000.00 3,125.00 3,125.00

Jumlah 23,125.00 - 23,125.00

80,000.00 41,280.00 41,280.00

125,000.00 6,250.00 6,250.00

40,000.00 40,000.00 40,000.00

Jumlah 87,530.00 - 87,530.00

175,000.00 210,000.00 210,000.00

80,000.00 24,000.00 24,000.00

125,000.00 1,250.00 1,250.00

Jumlah 235,250.00 210,000.00 25,250.00

210,000.00

180,000.00 216,000.00 216,000.00

80,000.00 24,000.00 24,000.00

125,000.00 1,250.00 1,250.00

Jumlah 241,250.00 216,000.00 25,250.00

250,000.00 300,000.00 300,000.00

80,000.00 24,000.00 24,000.00

125,000.00 1,250.00 1,250.00

Jumlah 325,250.00 300,000.00 25,250.00

500,000.00 600,000.00 600,000.00

180,000.00 77,760.00 77,760.00

80,000.00 62,400.00 62,400.00

110,000.00 42,900.00 42,900.00

Page 150: Analis Cipta Karya 2012-8 FEB 2012

120,000.00 4,680.00 4,680.00

125,000.00 4,875.00 4,875.00

Jumlah 792,615.00 677,760.00 114,855.00

500,000.00 600,000.00 600,000.00

1,600.00 260,800.00 260,800.00

235,000.00 122,200.00 122,200.00

80,000.00 120,000.00 120,000.00

110,000.00 82,500.00 82,500.00

120,000.00 9,000.00 9,000.00

125,000.00 9,375.00 9,375.00

Jumlah 1,203,875.00 983,000.00 220,875.00

2,400.00 55,200.00 55,200.00

1,600.00 30,320.00 30,320.00

235,000.00 8,930.00 8,930.00

80,000.00 24,000.00 24,000.00

110,000.00 11,000.00 11,000.00

120,000.00 1,200.00 1,200.00

125,000.00 1,875.00 1,875.00

Jumlah 132,525.00 94,450.00 38,075.00

Untuk 1 M3 1,325,250.00

2,400.00 55,200.00 55,200.00

1,600.00 18,400.00 18,400.00

235,000.00 10,105.00 10,105.00

80,000.00 24,000.00 24,000.00

110,000.00 11,000.00 11,000.00

120,000.00 1,200.00 1,200.00

125,000.00 1,875.00 1,875.00

Jumlah 121,780.00 83,705.00 38,075.00 Untuk 1 M3 1,217,800.00 837,050.00 380,750.00

1,600.00 368,000.00 368,000.00

175.00 156,275.00 156,275.00

Page 151: Analis Cipta Karya 2012-8 FEB 2012

185.19 190,185.19 190,185.19

100.00 20,000.00 20,000.00

80,000.00 96,000.00 96,000.00

110,000.00 22,000.00 22,000.00

120,000.00 2,400.00 2,400.00

125,000.00 7,500.00 7,500.00

Jumlah 862,360.19 734,460.19 127,900.00

862,360.19 862,360.19 714,460.19 147,900.00

22,764.00 1,122,948.12 1,050,729.00 72,219.12

Jumlah 1,985,308.31 1,765,189.19 220,119.12

1,600.00 593,600.00 593,600.00

175.00 122,150.00 122,150.00

648.15 678,611.11 678,611.11

100.00 21,500.00 21,500.00

80,000.00 132,000.00 132,000.00

110,000.00 30,250.00 30,250.00

120,000.00 3,360.00 3,360.00

125,000.00 10,375.00 10,375.00

Jumlah 1,591,846.11 1,415,861.11 175,985.00

1,600.00 521,600.00 521,600.00

175.00 133,000.00 133,000.00

648.15 666,944.44 666,944.44

100.00 21,500.00 21,500.00

80,000.00 132,000.00 132,000.00

110,000.00 30,250.00 30,250.00

120,000.00 3,360.00 3,360.00

125,000.00 10,375.00 10,375.00

Jumlah 1,519,029.44 1,343,044.44 175,985.00

3 4

1,600.00 441,600.00 441,600.00

175.00 145,075.00 145,075.00

185.19 187,407.41 187,407.41

100.00 21,500.00 21,500.00

80,000.00 132,000.00 132,000.00

110,000.00 30,250.00 30,250.00

120,000.00 3,360.00 3,360.00

125,000.00 10,375.00 10,375.00

Jumlah 971,567.41 795,582.41 175,985.00

Page 152: Analis Cipta Karya 2012-8 FEB 2012

20,000.00 210,000.00 21,000.00

20,000.00 3,000.00 300.00

80,000.00 5,600.00 560.00

110,000.00 7,700.00 770.00

120,000.00 840.00 84.00

125,000.00 500.00 50.00

Jumlah 227,640.00 21,300.00 1,464.00

Untuk 1 Kg 22,764.00 21,300.00 1,464.00

2,180,000.00 87,200.00 87,200.00

21,000.00 6,300.00 6,300.00

12,000.00 1,200.00 1,200.00

80,000.00 41,600.00 41,600.00

110,000.00 28,600.00 28,600.00

120,000.00 3,120.00 3,120.00

125,000.00 3,250.00 3,250.00

Jumlah 171,270.00 94,700.00 76,570.00

2,180,000.00 98,100.00 98,100.00

21,000.00 6,300.00 6,300.00

12,000.00 1,200.00 1,200.00

80,000.00 41,600.00 41,600.00

110,000.00 28,600.00 28,600.00

120,000.00 3,120.00 3,120.00

125,000.00 3,250.00 3,250.00

Jumlah 182,170.00 105,600.00 76,570.00

3 4

2,180,000.00 87,200.00 87,200.00

21,000.00 8,400.00 8,400.00

12,000.00 2,400.00 2,400.00

40,000.00 80,000.00 80,000.00

165,000.00 57,750.00 57,750.00

2,180,000.00 32,700.00 32,700.00

80,000.00 52,800.00 52,800.00

Page 153: Analis Cipta Karya 2012-8 FEB 2012

110,000.00 36,300.00 36,300.00

120,000.00 3,960.00 3,960.00

125,000.00 4,125.00 4,125.00

Jumlah 365,635.00 268,450.00 97,185.00

2,180,000.00 87,200.00 87,200.00

21,000.00 8,400.00 8,400.00

12,000.00 2,400.00 2,400.00

40,000.00 80,000.00 80,000.00

165,000.00 57,750.00 57,750.00

2,180,000.00 39,240.00 39,240.00

80,000.00 52,800.00 52,800.00

110,000.00 36,300.00 36,300.00

120,000.00 3,960.00 3,960.00

125,000.00 4,125.00 4,125.00

Jumlah 372,175.00 274,990.00 97,185.00

3 4

2,180,000.00 87,200.00 87,200.00

21,000.00 8,400.00 8,400.00

12,000.00 2,400.00 2,400.00

2,180,000.00 32,700.00 32,700.00

165,000.00 57,750.00 57,750.00

40,000.00 240,000.00 240,000.00

80,000.00 52,800.00 52,800.00

110,000.00 36,300.00 36,300.00

120,000.00 3,960.00 3,960.00

125,000.00 4,125.00 4,125.00

Jumlah 525,635.00 428,450.00 97,185.00

2,180,000.00 65,400.00 21,000.00 8,400.00 12,000.00 1,800.00 2,180,000.00 32,700.00 165,000.00 57,750.00 40,000.00 80,000.00

Page 154: Analis Cipta Karya 2012-8 FEB 2012

80,000.00 52,800.00 - 110,000.00 36,300.00 - 120,000.00 3,960.00 - 125,000.00 4,125.00 -

Jumlah 343,235.00

2,180,000.00 65,400.00 65,400.00

21,000.00 8,400.00 8,400.00

12,000.00 2,400.00 2,400.00

2,180,000.00 43,600.00 43,600.00

165,000.00 57,750.00 57,750.00

40,000.00 120,000.00 120,000.00

80,000.00 52,800.00 52,800.00

110,000.00 36,300.00 36,300.00

120,000.00 3,960.00 3,960.00

125,000.00 4,125.00 4,125.00

Jumlah 394,735.00 297,550.00 97,185.00

2,180,000.00 4,360.00 4,360.00

21,000.00 210.00 210.00

20,000.00 60,000.00 60,000.00

20,000.00 900.00 900.00

1,600.00 6,400.00 6,400.00

245,000.00 1,470.00 1,470.00

250,000.00 2,250.00 2,250.00

80,000.00 14,400.00 14,400.00

110,000.00 2,200.00 2,200.00

110,000.00 2,200.00 2,200.00

110,000.00 2,200.00 2,200.00

120,000.00 720.00 720.00

125,000.00 1,125.00 1,125.00

Jumlah 98,435.00 75,590.00 22,845.00

2,180,000.00 6,540.00 6,540.00

21,000.00 420.00 420.00

20,000.00 72,000.00 72,000.00

20,000.00 1,000.00 1,000.00

1,600.00 8,800.00 8,800.00

245,000.00 2,205.00 2,205.00

250,000.00 3,750.00 3,750.00

80,000.00 23,760.00 23,760.00

110,000.00 3,630.00 3,630.00

110,000.00 3,630.00 3,630.00

110,000.00 3,630.00 3,630.00

120,000.00 1,200.00 1,200.00

125,000.00 1,875.00 1,875.00

Jumlah 132,440.00 94,715.00 37,725.00

Page 155: Analis Cipta Karya 2012-8 FEB 2012

2,180,000.00 523,200.00 523,200.00

21,000.00 67,200.00 67,200.00

12,000.00 19,200.00 19,200.00

20,000.00 3,150,000.00 3,150,000.00

20,000.00 45,000.00 45,000.00

1,600.00 537,600.00 537,600.00

245,000.00 132,300.00 132,300.00

250,000.00 202,500.00 202,500.00

2,180,000.00 348,800.00 348,800.00

165,000.00 462,000.00 462,000.00

40,000.00 960,000.00 960,000.00

80,000.00 424,000.00 424,000.00

110,000.00 30,250.00 30,250.00

110,000.00 143,000.00 143,000.00

110,000.00 115,500.00 115,500.00

120,000.00 31,440.00 31,440.00

125,000.00 33,125.00 33,125.00

Jumlah 7,225,115.00 6,447,800.00 777,315.00

1,519,029.44 1,488,648.86 1,316,183.56 172,465.30

22,764.00 2,504,040.00 2,343,000.00 161,040.00

182,170.00 2,428,872.61 1,407,964.80 1,020,907.81

80,000.00 40,000.00 40,000.00

Jumlah 6,461,561.47 5,067,148.36 1,394,413.11

1,591,846.11 1,591,846.11 1,415,861.11 175,985.00

22,764.00 3,414,600.00 3,195,000.00 219,600.00

525,635.00 4,380,116.46 3,570,273.85 809,842.61

80,000.00 40,000.00 40,000.00

Jumlah 9,426,562.57 8,181,134.96 1,245,427.61

971,567.41 971,567.41 22,764.00 2,504,040.00 365,635.00 3,510,096.00 80,000.00 40,000.00

Jumlah 7,025,703.41

1,591,846.11 1,591,846.11 22,764.00 4,615,492.06 182,170.00 1,202,322.00 80,000.00 40,000.00

Jumlah 7,449,660.17

Page 156: Analis Cipta Karya 2012-8 FEB 2012

3 4

1,591,846.11 1,591,846.11 22,764.00 4,640,213.76 182,170.00 1,457,360.00 80,000.00 40,000.00

Jumlah 7,729,419.87

1,591,846.11 1,591,846.11 22,764.00 3,691,478.53 171,270.00 761,209.51

Jumlah 6,044,534.16

1,591,846.11 1,591,846.11 22,764.00 2,353,187.52 171,270.00 622,806.23

Jumlah 4,567,839.86

1,591,846.11 1,591,846.11 22,764.00 2,165,220.62 171,270.00 548,064.00

Jumlah 4,305,130.74

1,591,846.11 1,591,846.11 22,764.00 2,821,233.58 365,635.00 3,250,495.15 80,000.00 40,000.00

Jumlah 7,703,574.84

1,591,846.11 1,591,846.11 22,764.00 2,821,233.58 365,635.00 3,250,495.15 80,000.00 40,000.00

Jumlah 7,703,574.84

1,591,846.11 1,591,846.11 22,764.00 2,821,233.58 365,635.00 3,250,495.15 80,000.00 40,000.00

Jumlah 7,703,574.84

1,591,846.11 1,591,846.11 22,764.00 2,821,233.58 365,635.00 3,250,495.15 80,000.00 40,000.00

Jumlah 7,703,574.84

Page 157: Analis Cipta Karya 2012-8 FEB 2012

1,591,846.11 1,591,846.11 22,764.00 4,826,514.34 365,635.00 3,250,495.15 80,000.00 40,000.00

Jumlah 9,708,855.60

1,591,846.11 1,591,846.11 22,764.00 4,826,514.34 365,635.00 3,250,495.15 80,000.00 40,000.00

Jumlah 9,708,855.60

1,591,846.11 1,591,846.11 22,764.00 3,823,828.43 365,635.00 3,250,495.15 80,000.00 40,000.00

Jumlah 8,706,169.69

3 4

1,591,846.11 1,591,846.11 22,764.00 3,823,828.43 365,635.00 3,250,495.15 80,000.00 40,000.00

Jumlah 8,706,169.69

1,591,846.11 1,591,846.11 22,764.00 3,589,154.35 365,635.00 3,714,851.60 80,000.00 40,000.00

Jumlah 8,935,852.06

1,591,846.11 1,591,846.11 22,764.00 3,589,154.35 365,635.00 3,714,851.60 80,000.00 40,000.00

Jumlah 8,935,852.06

1,591,846.11 1,591,846.11 22,764.00 3,420,541.40 365,635.00 4,875,011.46 80,000.00 40,000.00

Jumlah 9,927,398.97

1,591,846.11 1,591,846.11 22,764.00 3,420,541.40

Page 158: Analis Cipta Karya 2012-8 FEB 2012

365,635.00 4,875,011.46 80,000.00 40,000.00

Jumlah 9,927,398.97

1,591,846.11 1,591,846.11 22,764.00 2,812,332.85 365,635.00 2,922,154.92 80,000.00 40,000.00

Jumlah 7,366,333.88

1,591,846.11 1,591,846.11 1,415,861.11 175,985.00

22,764.00 2,838,295.19 2,655,758.55 182,536.64

171,270.00 342,540.00 189,400.00 153,140.00

Jumlah 4,772,681.31 4,261,019.66 511,661.64

1,591,846.11 1,591,846.11 1,415,861.11 175,985.00

22,764.00 3,361,851.26 3,145,643.64 216,207.62

365,635.00 3,046,909.58 2,237,047.54 809,862.04

80,000.00 40,000.00 40,000.00

Jumlah 8,040,606.95 6,798,552.29 1,242,054.66

3 4

1,591,846.11 1,591,846.11 1,415,861.11 175,985.00

22,764.00 2,217,932.94 2,075,293.08 142,639.86

365,635.00 2,925,043.44 2,147,573.16 777,470.28

80,000.00 40,000.00 40,000.00

Jumlah 6,774,822.49 5,638,727.35 1,136,095.14

1,591,846.11 1,591,846.11 1,415,861.11 175,985.00

22,764.00 2,710,573.22 2,536,250.64 174,322.58

182,170.00 1,214,454.52 703,992.96 510,461.56

80,000.00 40,000.00 40,000.00

Jumlah 5,556,873.85 4,656,104.71 900,769.14

3 4

1,519,029.44 1,519,029.44 1,343,044.44 175,985.00

22,764.00 3,705,426.03 3,467,122.41 238,303.62

182,170.00 2,428,909.04 1,407,985.92 1,020,923.12

Page 159: Analis Cipta Karya 2012-8 FEB 2012

80,000.00 40,000.00 40,000.00

Jumlah 7,693,364.52 6,218,152.77 1,475,211.75

1,519,029.44 1,519,029.44 1,343,044.44 175,985.00

22,764.00 3,469,916.52 3,246,759.00 223,157.52

525,635.00 4,378,539.55 3,568,988.50 809,551.05

80,000.00 40,000.00 40,000.00

Jumlah 9,407,485.51 8,158,791.94 1,248,693.57

1,591,846.11 1,591,846.11 1,415,861.11 175,985.00

22,764.00 2,710,584.60 2,536,261.29 174,323.31

372,175.00 3,225,454.64 2,383,200.84 842,253.80

80,000.00 40,000.00 40,000.00

Jumlah 7,567,885.35 6,335,323.24 1,232,562.11

1,591,846.11 1,591,846.11 1,415,861.11 175,985.00

22,764.00 4,076,916.30 3,814,721.37 262,194.93

372,175.00 4,960,348.40 3,665,066.72 1,295,281.68

80,000.00 40,000.00 40,000.00

Jumlah 10,669,110.81 8,895,649.20 1,773,461.61

1,591,846.11 1,591,846.11 1,415,861.11 175,985.00

22,764.00 2,710,584.60 2,536,261.29 174,323.31

372,175.00 3,225,454.64 2,383,200.84 842,253.80

80,000.00 40,000.00 40,000.00

Jumlah 7,567,885.35 6,335,323.24 1,232,562.11

1,591,846.11 1,591,846.11 1,415,861.11 175,985.00

22,764.00 2,710,584.60 2,536,261.29 174,323.31

372,175.00 3,225,454.64 2,383,200.84 842,253.80

80,000.00 40,000.00 40,000.00

Jumlah 7,567,885.35 6,335,323.24 1,232,562.11

1,591,846.11 1,591,846.11 1,415,861.11 175,985.00

22,764.00 3,589,386.54 3,358,545.66 230,840.88

372,175.00 4,962,134.84 3,666,386.67 1,295,748.17

80,000.00 40,000.00 40,000.00

Jumlah 10,183,367.50 8,440,793.44 1,742,574.05

1,591,846.11 1,591,846.11 1,415,861.11 175,985.00

22,764.00 2,710,584.60 2,536,261.29 174,323.31

372,175.00 3,225,454.64 2,383,200.84 842,253.80

80,000.00 40,000.00 40,000.00

Jumlah 7,567,885.35 6,335,323.24 1,232,562.11

Page 160: Analis Cipta Karya 2012-8 FEB 2012

3 4

1,519,029.44 1,519,029.44 1,343,044.44 175,985.00

22,764.00 3,247,739.88 3,038,871.00 208,868.88

525,635.00 5,256,350.00 4,284,500.00 971,850.00

80,000.00 40,000.00 40,000.00

Jumlah 10,063,119.32 8,666,415.44 1,396,703.88

1,519,029.44 1,519,029.44 1,343,044.44 175,985.00

22,764.00 3,469,916.52 3,246,759.00 223,157.52

525,635.00 4,378,539.55 3,568,988.50 809,551.05

80,000.00 40,000.00 40,000.00

Jumlah 9,407,485.51 8,158,791.94 1,248,693.57

1,519,029.44 1,519,029.44 1,343,044.44 175,985.00 22,764.00 4,807,754.52 4,498,557.87 309,196.65 365,635.00 5,850,160.00 4,295,200.00 1,554,960.00 80,000.00 40,000.00 40,000.00

Jumlah 12,216,943.97 10,136,802.31 2,080,141.65

1,519,029.44 1,519,029.44 1,343,044.44 175,985.00 22,764.00 4,076,916.30 3,814,721.37 262,194.93 182,170.00 2,427,961.76 1,407,436.80 1,020,524.96 80,000.00 40,000.00 40,000.00

Jumlah 8,063,907.51 6,565,202.61 1,498,704.89

1,519,029.44 1,519,029.44 1,343,044.44 175,985.00

22,764.00 2,969,286.08 2,778,325.14 190,960.94

171,270.00 570,894.29 315,663.51 255,230.78

Jumlah 5,059,209.81 4,437,033.09 622,176.72

1,519,029.44 1,519,029.44 1,343,044.44 175,985.00

22,764.00 2,883,424.82 2,697,985.80 185,439.02

171,270.00 456,708.58 252,527.02 204,181.56

Jumlah 4,859,162.85 4,293,557.26 565,605.59

1,519,029.44 1,519,029.44 1,343,044.44 175,985.00

Page 161: Analis Cipta Karya 2012-8 FEB 2012

22,764.00 4,076,916.30 3,814,721.37 262,194.93

372,175.00 4,960,348.40 3,665,066.72 1,295,281.68

80,000.00 40,000.00 40,000.00

Jumlah 10,596,294.15 8,822,832.53 1,773,461.61

1,519,029.44 1,519,029.44 1,343,044.44 175,985.00

22,764.00 5,457,757.78 5,106,758.07 350,999.71

365,635.00 9,018,094.77 6,621,104.49 2,396,990.28

80,000.00 40,000.00 40,000.00

Jumlah 16,034,881.99 13,070,907.00 2,963,974.99

1,519,029.44 1,519,029.44 1,343,044.44 175,985.00

22,764.00 3,705,426.03 3,467,122.41 238,303.62

182,170.00 2,428,909.04 1,407,985.92 1,020,923.12

80,000.00 40,000.00 40,000.00

Jumlah 7,693,364.52 6,218,152.77 1,475,211.75

1,519,029.44 1,519,029.44 1,343,044.44 175,985.00

22,764.00 3,705,426.03 3,467,122.41 238,303.62

372,175.00 4,962,283.71 3,666,496.67 1,295,787.04

80,000.00 40,000.00 40,000.00

Jumlah 10,226,739.19 8,476,663.52 1,750,075.67

1,591,846.11 1,591,846.11 1,415,861.11 175,985.00

22,764.00 3,821,103.58 3,575,360.49 245,743.09

171,270.00 380,596.19 210,442.34 170,153.85

Jumlah 5,793,545.88 5,201,663.94 591,881.94

3 4

1,591,846.11 1,591,846.11 1,415,861.11 175,985.00 22,764.00 4,579,520.38 4,285,001.94 294,518.44 171,270.00 513,810.00 284,100.00 229,710.00

Jumlah 6,685,176.49 5,984,963.05 700,213.44

1,591,846.11 1,591,846.11 1,415,861.11 175,985.00 22,764.00 3,628,454.12 3,395,100.72 233,353.40 171,270.00 508,363.61 281,088.54 227,275.07

Jumlah 5,728,663.85 5,092,050.37 636,613.48

1,591,846.11 1,591,846.11 22,764.00 3,181,826.72 171,270.00 399,453.02

Jumlah 5,173,125.85

Page 162: Analis Cipta Karya 2012-8 FEB 2012

1,591,846.11 1,591,846.11 22,764.00 2,581,080.21 171,270.00 225,425.57

Jumlah 4,398,351.89

1,591,846.11 1,591,846.11 22,764.00 1,743,128.26 171,270.00 181,152.28

Jumlah 3,516,126.65

1,591,846.11 1,591,846.11 22,764.00 2,450,289.64 171,270.00 254,370.20

Jumlah 4,296,505.96

1,591,846.11 1,591,846.11 22,764.00 2,409,715.09 171,270.00 285,335.82

Jumlah 4,286,897.02

1,591,846.11 1,591,846.11 22,764.00 2,605,567.44 372,175.00 3,101,334.28 80,000.00 40,000.00

Jumlah 7,338,747.83

1,591,846.11 1,591,846.11 22,764.00 3,109,423.54 372,175.00 3,101,334.28 80,000.00 40,000.00

Jumlah 7,842,603.93

1,591,846.11 1,591,846.11 22,764.00 3,109,423.54 372,175.00 3,101,334.28 80,000.00 40,000.00

Jumlah 7,842,603.93

1,591,846.11 1,591,846.11 22,764.00 2,605,567.44 372,175.00 3,101,334.28 80,000.00 40,000.00

Jumlah 7,338,747.83

1,591,846.11 1,591,846.11 22,764.00 3,109,423.54 372,175.00 3,101,334.28 80,000.00 40,000.00

Page 163: Analis Cipta Karya 2012-8 FEB 2012

Jumlah 7,842,603.93

1,591,846.11 1,591,846.11 22,764.00 2,968,225.28 372,175.00 3,101,334.28 80,000.00 40,000.00

Jumlah 7,701,405.66

3 4

1,591,846.11 1,591,846.11 22,764.00 2,605,567.44 372,175.00 3,101,334.28 80,000.00 40,000.00

Jumlah 7,338,747.83

1,591,846.11 1,591,846.11 22,764.00 4,380,421.89 372,175.00 3,101,334.28 80,000.00 40,000.00

Jumlah 9,113,602.27

1,591,846.11 1,591,846.11 22,764.00 2,968,225.28 372,175.00 3,101,334.28 80,000.00 40,000.00

Jumlah 7,701,405.66

1,591,846.11 1,591,846.11 22,764.00 3,715,073.42 372,175.00 3,804,075.11 80,000.00 40,000.00

Jumlah 9,150,994.64

1,591,846.11 1,591,846.11 22,764.00 4,521,642.91 372,175.00 3,101,334.28 80,000.00 40,000.00

Jumlah 9,254,823.30

1,591,846.11 1,591,846.11 22,764.00 4,437,616.44 372,175.00 2,658,371.59 80,000.00 40,000.00

Page 164: Analis Cipta Karya 2012-8 FEB 2012

Jumlah 8,727,834.14

1,591,846.11 1,591,846.11 22,764.00 3,715,073.42 372,175.00 3,804,075.11 80,000.00 40,000.00

Jumlah 9,150,994.64

1,591,846.11 1,591,846.11 22,764.00 3,918,847.64 372,175.00 2,658,371.59 80,000.00 40,000.00

Jumlah 8,209,065.34

1,591,846.11 1,591,846.11 22,764.00 4,380,421.89 372,175.00 3,101,334.28 80,000.00 40,000.00

Jumlah 9,113,602.27

1,591,846.11 1,591,846.11 22,764.00 2,737,161.57 372,175.00 3,804,075.11 80,000.00 40,000.00

Jumlah 8,173,082.79

3 4

1,591,846.11 1,591,846.11 22,764.00 4,494,371.64 372,175.00 4,962,134.84 80,000.00 40,000.00

Jumlah 11,088,352.59

1,591,846.11 1,591,846.11 22,764.00 3,842,522.22 372,175.00 4,652,187.50 80,000.00 40,000.00

Jumlah 10,126,555.84

1,591,846.11 1,591,846.11 22,764.00 2,073,397.48 372,175.00 3,101,334.28 80,000.00 40,000.00

Jumlah 6,806,577.86

Page 165: Analis Cipta Karya 2012-8 FEB 2012

1,591,846.11 1,591,846.11 22,764.00 2,634,145.37 372,175.00 3,101,334.28 80,000.00 40,000.00

Jumlah 7,367,325.75

1,591,846.11 1,591,846.11 22,764.00 4,022,603.68 372,175.00 2,658,371.59 80,000.00 40,000.00

Jumlah 8,312,821.38

1,591,846.11 1,591,846.11 22,764.00 3,503,834.88 372,175.00 2,658,371.59 80,000.00 40,000.00

Jumlah 7,794,052.58

1,591,846.11 1,591,846.11 22,764.00 2,262,126.97 372,175.00 3,101,334.28 80,000.00 40,000.00

Jumlah 6,995,307.36

1,591,846.11 1,591,846.11 22,764.00 2,459,713.94 372,175.00 3,101,334.28 80,000.00 40,000.00

Jumlah 7,192,894.33

1,591,846.11 1,591,846.11 22,764.00 2,742,274.37 372,175.00 3,101,334.28 80,000.00 40,000.00

Jumlah 7,475,454.75

1,591,846.11 1,591,846.11 22,764.00 3,579,513.80 372,175.00 3,804,075.11 80,000.00 40,000.00

Jumlah 9,015,435.02

3 4

Page 166: Analis Cipta Karya 2012-8 FEB 2012

1,591,846.11 1,591,846.11 22,764.00 3,828,039.77 372,175.00 3,804,075.11 80,000.00 40,000.00

Jumlah 9,263,960.99

1,591,846.11 1,591,846.11 22,764.00 3,336,266.80 372,175.00 3,225,194.12 80,000.00 40,000.00

Jumlah 8,193,307.03

1,591,846.11 1,591,846.11 22,764.00 3,336,266.80 372,175.00 3,225,194.12 80,000.00 40,000.00

Jumlah 8,193,307.03

1,591,846.11 1,591,846.11 22,764.00 2,573,750.20 372,175.00 3,225,194.12 80,000.00 40,000.00

Jumlah 7,430,790.42

1,591,846.11 1,591,846.11 22,764.00 3,149,872.89 372,175.00 3,225,194.12 80,000.00 40,000.00

Jumlah 8,006,913.12

1,591,846.11 1,591,846.11 22,764.00 2,810,976.12 372,175.00 3,225,194.12 80,000.00 40,000.00

Jumlah 7,668,016.34

1,591,846.11 1,591,846.11 22,764.00 2,810,976.12 372,175.00 3,225,194.12 80,000.00 40,000.00

Jumlah 7,668,016.34

1,591,846.11 1,591,846.11 22,764.00 3,173,101.28 372,175.00 3,225,194.12 80,000.00 40,000.00

Jumlah 8,030,141.50

Page 167: Analis Cipta Karya 2012-8 FEB 2012

1,591,846.11 1,591,846.11 22,764.00 2,487,957.23 372,175.00 3,225,194.12 80,000.00 40,000.00

Jumlah 7,344,997.46

1,591,846.11 1,591,846.11 22,764.00 2,487,957.23 372,175.00 3,225,194.12 80,000.00 40,000.00

Jumlah 7,344,997.46

3 4

1,591,846.11 1,591,846.11 22,764.00 3,261,584.94 372,175.00 3,804,075.11 80,000.00 40,000.00

Jumlah 8,697,506.17

1,591,846.11 1,591,846.11 22,764.00 3,261,584.94 372,175.00 3,804,075.11 80,000.00 40,000.00

Jumlah 8,697,506.17

1,591,846.11 1,591,846.11 22,764.00 2,487,877.56 372,175.00 3,804,075.11 80,000.00 40,000.00

Jumlah 7,923,798.78

1,591,846.11 1,591,846.11 22,764.00 5,695,734.91 372,175.00 4,962,134.84 80,000.00 40,000.00

Jumlah 12,289,715.86

1,591,846.11 1,591,846.11 22,764.00 5,695,734.91 372,175.00 4,962,134.84 80,000.00 40,000.00

Jumlah 12,289,715.86

Page 168: Analis Cipta Karya 2012-8 FEB 2012

1,591,846.11 1,591,846.11 22,764.00 3,533,104.83 372,175.00 3,101,334.28 80,000.00 40,000.00

8,266,285.22

1,591,846.11 1,591,846.11 22,764.00 2,262,126.97 372,175.00 3,101,334.28 80,000.00 40,000.00

Jumlah 6,995,307.36

1,591,846.11 1,591,846.11 22,764.00 5,695,734.91 372,175.00 4,962,134.84 80,000.00 40,000.00

Jumlah 12,289,715.86

1,591,846.11 1,591,846.11 22,764.00 4,097,982.11 372,175.00 3,101,334.28 80,000.00 40,000.00

Jumlah 8,831,162.50

1,591,846.11 1,591,846.11 22,764.00 2,332,736.35 372,175.00 3,101,334.28 80,000.00 40,000.00

Jumlah 7,065,916.73

3 4

1,591,846.11 1,591,846.11 22,764.00 2,487,957.23 372,175.00 3,225,194.12 80,000.00 40,000.00

Jumlah 7,344,997.46

1,591,846.11 1,591,846.11 22,764.00 3,806,498.19 372,175.00 2,658,371.59 80,000.00 40,000.00

Page 169: Analis Cipta Karya 2012-8 FEB 2012

Jumlah 8,096,715.90

1,591,846.11 1,591,846.11 22,764.00 5,695,734.91 372,175.00 4,962,134.84 80,000.00 40,000.00

Jumlah 12,289,715.86

1,591,846.11 1,591,846.11 22,764.00 3,579,513.80 372,175.00 3,804,075.11 80,000.00 40,000.00

Jumlah 9,015,435.02

1,600.00 304,000.00 304,000.00

245,000.00 208,250.00 208,250.00

80,000.00 480,000.00 480,000.00

110,000.00 55,000.00 55,000.00

120,000.00 6,000.00 6,000.00

125,000.00 37,500.00 37,500.00

Jumlah 1,090,750.00 512,250.00 578,500.00

1,519,029.44 1,519,029.44 1,343,044.44 175,985.00

22,764.00 2,330,259.62 2,180,395.80 149,863.82

365,635.00 3,656,350.00 2,684,500.00 971,850.00

80,000.00 60,000.00 60,000.00

Jumlah 7,565,639.07 6,207,940.24 1,357,698.82

1519029.4444444 1,519,029.44 22764 2,849,720.45

365635 3,034,770.50 80000 60,000.00

Jumlah 7,463,520.39

1591846.1111111 1,591,846.11 22764 3,247,739.88

343235 2,917,497.50 80000 40,000.00

Jumlah 7,797,083.49

1,591,846.11 1,591,846.11 1,415,861.11 175,985.00

22,764.00 3,469,916.52 3,246,759.00 223,157.52

Page 170: Analis Cipta Karya 2012-8 FEB 2012

525,635.00 4,378,539.55 3,568,988.50 809,551.05

80,000.00 40,000.00 40,000.00

Jumlah 9,480,302.18 8,231,608.61 1,248,693.57

1,591,846.11 1,591,846.11 1,415,861.11 175,985.00

22,764.00 3,247,739.88 3,038,871.00 208,868.88

525,635.00 5,256,350.00 4,284,500.00 971,850.00

80,000.00 40,000.00 40,000.00

Jumlah 10,135,935.99 8,739,232.11 1,396,703.88

862,360.19 86,236.02 73,446.02 12,790.00

62,021.60 49,617.28 14,277.28 35,340.00

34,650.00 27,720.00 4,160.00 23,560.00

99,725.00 79,780.00 39,280.00 40,500.00 Jumlah 243,353.30 131,163.30 112,190.00

971,567.41 971,567.41 795,582.41 175,985.00

22,764.00 809,260.20 757,215.00 52,045.20

525,635.00 5,256,350.00 4,284,500.00 971,850.00

80,000.00 40,000.00 40,000.00

Jumlah 7,077,177.61 5,837,297.41 1,239,880.20

1,600.00 16,358.40 16,358.40

235,000.00 4,700.00 4,700.00

80,000.00 24,000.00 24,000.00

110,000.00 16,500.00 16,500.00

120,000.00 1,800.00 1,800.00

125,000.00 1,875.00 1,875.00

Jumlah 65,233.40 21,058.40 44,175.00

3 4

1,600.00 12,441.60 12,441.60

235,000.00 5,405.00 5,405.00

80,000.00 24,000.00 24,000.00

Page 171: Analis Cipta Karya 2012-8 FEB 2012

110,000.00 16,500.00 16,500.00

120,000.00 1,800.00 1,800.00

125,000.00 1,875.00 1,875.00

Jumlah 62,021.60 17,846.60 44,175.00

3 4

1,600.00 5,200.00 5,200.00

80,000.00 16,000.00 16,000.00

110,000.00 11,000.00 11,000.00

120,000.00 1,200.00 1,200.00

125,000.00 1,250.00 1,250.00

Jumlah 34,650.00 5,200.00 29,450.00

1,600.00 9,984.00 9,984.00

235,000.00 5,640.00 5,640.00

80,000.00 24,000.00 24,000.00

110,000.00 16,500.00 16,500.00

120,000.00 1,800.00 1,800.00 125,000.00 1,875.00 1,875.00

Jumlah 59,799.00 15,624.00 44,175.00

30,000.00 87,000.00 87,000.00

80,000.00 24,000.00 24,000.00

110,000.00 22,000.00 22,000.00

120,000.00 2,400.00 2,400.00

125,000.00 1,875.00 1,875.00

Jumlah 137,275.00 87,000.00 50,275.00

4.00

4.00

128,005.76 87,299.93 87,299.93

1,600.00 3,072.00 3,072.00

235,000.00 2,115.00 2,115.00

7,500.00 2,430.00 2,430.00

80,000.00 11,200.00 11,200.00

110,000.00 7,700.00 7,700.00

120,000.00 840.00 840.00

125,000.00 875.00 875.00

Page 172: Analis Cipta Karya 2012-8 FEB 2012

1.00 115,531.93 94,916.93 20,615.00

15,000.00 79,500.00 79,500.00

1,600.00 1,824.00 1,824.00

235,000.00 705.00 705.00

7,500.00 750.00 750.00

80,000.00 7,200.00 7,200.00

110,000.00 9,900.00 9,900.00

120,000.00 1,080.00 1,080.00

125,000.00 625.00 625.00

1.00 101,584.00 82,779.00 18,805.00

4,700.00 101,520.00 101,520.00

1,600.00 14,880.00 14,880.00

235,000.00 4,230.00 4,230.00

7,500.00 14,550.00 14,550.00

80,000.00 72,000.00 72,000.00

110,000.00 49,500.00 49,500.00

120,000.00 5,400.00 5,400.00

125,000.00 5,625.00 5,625.00

1.00 267,705.00 135,180.00 132,525.00

135,180.00 132,525.00

3 4PASANGAN LANTAI KERAMIK (Granito) 60/60 (SNI 7395:2008)

128,005.76 396,817.85 396,817.85

235,000.00 10,575.00 10,575.00

1,600.00 15,360.00 15,360.00

7,500.00 12,150.00 12,150.00

80,000.00 56,000.00 56,000.00

110,000.00 38,500.00 38,500.00

120,000.00 4,200.00 4,200.00

125,000.00 4,375.00 4,375.00

1.00 537,977.85 434,902.85 103,075.00

1.05 564,876.75

128,005.76 134,406.05 134,406.05 41,292.18

6,000.00 12,000.00 12,000.00

1,500.00 18,660.00 18,660.00

250,000.00 6,250.00 6,250.00

3,000.00 4,500.00 4,500.00

75,000.00 39,000.00 39,000.00

100,000.00 65,000.00 65,000.00

105,000.00 6,825.00 6,825.00

110,000.00 3,850.00 3,850.00

290,491.05 175,816.05 155,967.18 1.09 586,395.86

434,902.85 103,075.00

Page 173: Analis Cipta Karya 2012-8 FEB 2012

3 4

2,050,000.00 2,173,000.00 2,173,000.00

1,200.00 3,603.60 3,603.60

235,000.00 5,875.00 5,875.00

1,600.00 19,904.00 19,904.00

7,500.00 4,875.00 4,875.00

80,000.00 104,000.00 104,000.00

110,000.00 71,500.00 71,500.00

120,000.00 7,800.00 7,800.00

125,000.00 8,125.00 8,125.00

1 2,398,682.60 34,257.60 191,425.00

2,207,257.60 191,425.00

17,000.00 112,710.00 112,710.00

235,000.00 10,575.00 10,575.00

1,600.00 13,104.00 13,104.00

7,500.00 12,150.00 12,150.00

80,000.00 56,000.00 56,000.00

110,000.00 38,500.00 38,500.00

120,000.00 4,200.00 4,200.00

125,000.00 4,375.00 4,375.00

1.00 251,614.00 148,539.00 103,075.00

8,000.00 94,960.00 94,960.00

235,000.00 10,575.00 10,575.00

1,600.00 16,000.00 16,000.00

7,500.00 11,250.00 11,250.00

80,000.00 56,000.00 56,000.00

110,000.00 38,500.00 38,500.00

120,000.00 4,200.00 4,200.00

125,000.00 4,375.00 4,375.00

1.00 235,860.00 132,785.00 103,075.00

3,500.00 92,750.00 92,750.00

235,000.00 10,575.00 10,575.00

1,600.00 16,640.00 16,640.00

7,500.00 12,150.00 12,150.00

80,000.00 56,000.00 56,000.00

110,000.00 38,500.00 38,500.00

120,000.00 4,200.00 4,200.00

125,000.00 4,375.00 4,375.00

1.00 235,190.00 132,115.00 103,075.00

108,228.75 1.05

240,343.75 1.02 132,115.00 103,075.00

Page 174: Analis Cipta Karya 2012-8 FEB 2012

50,000.00 1,250,000.00 1,250,000.00

1,600.00 14,880.00 14,880.00

235,000.00 4,230.00 4,230.00

80,000.00 48,000.00 48,000.00

110,000.00 11,000.00 11,000.00

120,000.00 5,400.00 5,400.00

125,000.00 3,750.00 3,750.00

1.00 1,337,260.00 1,269,110.00 68,150.00

1.05 1,404,123.00 1.09 1,530,494.07 Jumlah 1,337,260.00 1,269,110.00 68,150.00

230,000.00 276,000.00 276,000.00

1,200.00 1,200.00 1,200.00

80,000.00 1,600.00 1,600.00

110,000.00 22,000.00 22,000.00

120,000.00 2,400.00 2,400.00

125,000.00 312.50 312.50

Jumlah 303,512.50 277,200.00 26,312.50

90,000.00 198,000.00 198,000.00

40,000.00 10,000.00 10,000.00

80,000.00 28,000.00 28,000.00

110,000.00 19,250.00 19,250.00

120,000.00 2,040.00 2,040.00

125,000.00 250.00 250.00

Jumlah 257,540.00 208,000.00 49,540.00

45,000.00 54,000.00 54,000.00

40,000.00 4,000.00 4,000.00

80,000.00 20,000.00 20,000.00

110,000.00 27,500.00 27,500.00

120,000.00 3,000.00 3,000.00

Jumlah 108,500.00 58,000.00 50,500.00

32,000.00 4,800.00 45,000.00 2,250.00 2,250.00

5,000.00 500.00 500.00

12,000.00 120.00 120.00

75,000.00 12,000.00 12,000.00

100,000.00 16,000.00 16,000.00

105,000.00 1,680.00 1,680.00

110,000.00 275.00 2,750.00 29,800.00 37,625.00

3 4

35,000.00 5,250.0000 5,250.00

Page 175: Analis Cipta Karya 2012-8 FEB 2012

50,000.00 2,500.0000 2,500.00

4,000.00 400.0000 400.00

12,000.00 120.0000 120.00 120.00

80,000.00 12,800.0000 12,800.00

110,000.00 17,600.0000 17,600.00

120,000.00 1,920.0000 1,920.00

125,000.00 312.5000 312.50

Jumlah 40,902.5000 8,270.00 32,752.50

700.00 840.00 840.00

9,500.00 4,275.00 4,275.00

80,000.00 1,600.00 1,600.00

110,000.00 6,930.00 6,930.00

120,000.00 756.00 756.00

125,000.00 312.50 312.50

Jumlah 14,713.50 5,115.00 9,598.50

CAT MINYAK (1 x Lapis Plamur Kayu, 1 x Cat Dasar, 3 x Cat Penutup)

25,000.00 5,000.00 5,000.00

34,000.00 5,100.00 5,100.00

75,000.00 12,750.00 12,750.00

75,000.00 26,250.00 26,250.00

80,000.00 20,000.00 20,000.00

110,000.00 27,500.00 27,500.00

120,000.00 3,000.00 3,000.00

125,000.00 125.00 125.00

Jumlah 99,725.00 49,100.00 50,625.00

40,000.00 4,400.00 4,400.00

80,000.00 6,400.00 6,400.00

110,000.00 12,100.00 12,100.00

120,000.00 1,320.00 1,320.00

125,000.00 625.00 625.00

Jumlah 24,845.00 4,400.00 20,445.00

3 4

(1 Lapis Plamir, 1 Lapis Cat Dasar, dan 2 lapis cat penutup)

34,000.00 3,400.00 3,400.00

40,000.00 4,000.00 4,000.00

45,000.00 11,700.00 11,700.00

80,000.00 1,600.00 1,600.00

110,000.00 6,930.00 6,930.00

120,000.00 756.00 756.00

Page 176: Analis Cipta Karya 2012-8 FEB 2012

125,000.00 312.50 312.50

3,000.00 3,000.00 3,000.00

31,698.50 22,100.00 9,598.50 - 23,205.00 10,078.43

14,959,642,784.54

(1 Lapis Plamir, 1 Lapis Cat Dasar, dan 2 lapis cat penutup) 34,000.00 3,400.00 3,400.00

52,500.00 5,250.00 5,250.00

85,000.00 22,100.00 22,100.00

80,000.00 1,600.00 1,600.00

110,000.00 6,930.00 6,930.00

120,000.00 756.00 756.00

125,000.00 312.50 312.50

4,000.00 4,000.00 4,000.00 9,598.50

Jumlah Lt 1 44,348.50 34,750.00 19,197.00 36,487.50 20,156.85

25,000.00 8,250.00 8,250.00

7,500.00 75.00 75.00

80,000.00 1,600.00 1,600.00

110,000.00 22,000.00 22,000.00

120,000.00 2,400.00 2,400.00

125,000.00 1,250.00 1,250.00

Jumlah 35,575.00 8,325.00 27,250.00

52,000.00 18,200.00 18,200.00

50,000.00 10,000.00 10,000.00

42,900.00 7,293.00 7,293.00

4,000.00 4,000.00 4,000.00

49,700.00 62,125.00 62,125.00

49,700.00 14,910.00 14,910.00

7,500.00 7,500.00 7,500.00

80,000.00 20,000.00 20,000.00

110,000.00 38,500.00 38,500.00

120,000.00 3,000.00 3,000.00

125,000.00 125.00 125.00

Jumlah 185,653.00 124,028.00 61,625.00

3 4

46,000.00 18,400.00 18,400.00

49,700.00 49,700.00 49,700.00

49,700.00 14,910.00 14,910.00

49,700.00 14,910.00 14,910.00

Page 177: Analis Cipta Karya 2012-8 FEB 2012

55,000.00 16,500.00 16,500.00

4,000.00 800.00 800.00

80,000.00 20,000.00 20,000.00

110,000.00 27,500.00 27,500.00

120,000.00 3,000.00 3,000.00

125,000.00 125.00 125.00

Jumlah 165,845.00 115,220.00 50,625.00

3,250,000.00 91,000.00 91,000.00

21,000.00 3,150.00 3,150.00

80,000.00 12,000.00 12,000.00

110,000.00 49,500.00 49,500.00

120,000.00 5,400.00 5,400.00

125,000.00 1,000.00 1,000.00

Jumlah 162,050.00 94,150.00 67,900.00

2,180,000.00 34,880.00 34,880.00

21,000.00 1,687.50 1,687.50

80,000.00 6,428.57 6,428.57

110,000.00 26,517.86 26,517.86

120,000.00 1,549.74 1,549.74

125,000.00 535.71 535.71

Jumlah 71,599.39 36,567.50 35,031.89

2,180,000.00 35,534.00 35,534.00

21,000.00 5,250.00 5,250.00

80,000.00 16,000.00 16,000.00

110,000.00 33,000.00 33,000.00

120,000.00 3,600.00 3,600.00

125,000.00 1,250.00 1,250.00

Jumlah 94,634.00 40,784.00 53,850.00 PEKERJAAN RANGKA PLAFOND 1,00X1,00 M2, HOLLOW 40X40X1,2 MM

23,000.00 67,528.00 67,528.00

13,362.00 13,362.00 13,362.00

80,000.00 7,200.00 7,200.00

110,000.00 1,650.00 1,650.00

120,000.00 1,080.00 1,080.00

125,000.00 56.25 56.25

Jumlah 90,876.25 80,890.00 9,986.25 PEKERJAAN RANGKA PLAFOND 1,00X1,00 M2, HOLLOW 40X40X1,2 MM

23,000.00 19,550.00 19,550.00

13,362.00 13,362.00 13,362.00

80,000.00 7,200.00 7,200.00

Page 178: Analis Cipta Karya 2012-8 FEB 2012

110,000.00 1,650.00 1,650.00

120,000.00 1,080.00 1,080.00

125,000.00 56.25 56.25

Jumlah 42,898.25 32,912.00 9,986.25 1.09 103,151.06 1.15 108,829.10

20,000.00 23,000.00 23,000.00

3,450.00 3,450.00 3,450.00

25,000.00 2,000.00 2,000.00

80,000.00 4,800.00 4,800.00

110,000.00 6,600.00 120,000.00 720.00 125,000.00 375.00 1,000.00 1,000.00

Jumlah 41,945.00 25,000.00 8,250.00

2,180,000.00 61,694.00 61,694.00

21,000.00 8,400.00 8,400.00

1,000.00 1,000.00 1,000.00

80,000.00 21,600.00 21,600.00

110,000.00 44,550.00 44,550.00

120,000.00 4,860.00 4,860.00

125,000.00 1,687.50 1,687.50

Jumlah 143,791.50 71,094.00 72,697.50

3 4

50,000.00 42,500.00 42,500.00

17,000.00 17,000.00 17,000.00

118,000.00 42,952.00 42,952.00

280,000.00 19,600.00 19,600.00

80,000.00 26,400.00 26,400.00

110,000.00 46,046.00 46,046.00

120,000.00 5,640.00 5,640.00

125,000.00 1,937.50 1,937.50

Jumlah 202,075.50 122,052.00 80,023.50

3 4

Page 179: Analis Cipta Karya 2012-8 FEB 2012

1.09 220,262.30 1.5 303,113.25

25.92

43.20

25.20

68.40

50,000.00 42,500.00 42,500.00

1,000.00 1,000.00 1,000.00

118,000.00 42,952.00 42,952.00

280,000.00 19,600.00 19,600.00

80,000.00 39,600.00 39,600.00

110,000.00 69,069.00 69,069.00

120,000.00 8,460.00 8,460.00

125,000.00 2,906.25 2,906.25

1,000.00 1,000.00 1,000.00

Jumlah 226,087.25 107,052.00 120,035.25

112,000.00 37,632.00 37,632.00

22,000.00 440.00 440.00

80,000.00 8,000.00 8,000.00

110,000.00 5,500.00 5,500.00

120,000.00 600.00 600.00

125,000.00 625.00 625.00

Jumlah 52,797.00 38,072.00 14,725.00

112,000.00 41,104.00 41,104.00

22,000.00 5,500.00 5,500.00

80,000.00 8,000.00 8,000.00

110,000.00 5,500.00 5,500.00

120,000.00 600.00 600.00

125,000.00 625.00 625.00

Jumlah 61,329.00 46,604.00 14,725.00 1.09 66,848.61 1.15 70,528.35

7,000.00 96,250.00 96,250.00

21,000.00 5,250.00 5,250.00

80,000.00 1,680.00 1,680.00

110,000.00 2,310.00 2,310.00

120,000.00 240.00 240.00

125,000.00 125.00 125.00

Jumlah 105,855.00 101,500.00 4,355.00 1.09 115,381.95 1.15 121,733.25

175,000.00 64,225.00 64,225.00

Page 180: Analis Cipta Karya 2012-8 FEB 2012

112,000.00 40,320.00 40,320.00 22,000.00 440.00 440.00 42,000.00 10,500.00 10,500.00

- - - -

80,000.00 22,400.00 22,400.00 110,000.00 88,000.00 88,000.00 120,000.00 9,600.00 9,600.00 125,000.00 1,750.00 1,750.00

Jumlah 237,235.00 115,485.00 121,750.00

175,000.00 64,225.00 64,225.00

112,000.00 40,320.00 40,320.00

22,000.00 440.00 440.00

42,000.00 10,500.00 10,500.00

- - `

- -

80,000.00 30,240.00 30,240.00

110,000.00 118,800.00 118,800.00

120,000.00 12,960.00 12,960.00 125,000.00 2,362.50 2,362.50 1,000.00 1,000.00 1,000.00

Jumlah 280,847.50 116,485.00 164,362.50

377,625.00

118,000.00 42,952.00 42,952.00

280,000.00 30,800.00 30,800.00

80,000.00 8,000.00 8,000.00

110,000.00 5,500.00 5,500.00

120,000.00 600.00 600.00

125,000.00 625.00 625.00

Jumlah 88,477.00 73,752.00 14,725.00 1.09 96,439.93 1.15 101,748.55

20,000.00 24,000.00 24,000.00

21,000.00 210.00 210.00

80,000.00 4,000.00 4,000.00

110,000.00 5,500.00 5,500.00

120,000.00 600.00 600.00

125,000.00 375.00 375.00

Jumlah 34,685.00 24,210.00 10,475.00

15,000.00 18,000.00 18,000.00

21,000.00 210.00 210.00

80,000.00 4,000.00 4,000.00

110,000.00 5,500.00 5,500.00

120,000.00 600.00 600.00

125,000.00 375.00 375.00

Page 181: Analis Cipta Karya 2012-8 FEB 2012

Jumlah 28,685.00 18,210.00 10,475.00

10,000.00 12,000.00 12,000.00

21,000.00 210.00 210.00

80,000.00 4,000.00 4,000.00

110,000.00 5,500.00 5,500.00

120,000.00 600.00 600.00

125,000.00 375.00 375.00

Jumlah 22,685.00 12,210.00 10,475.00

4

16,000.00 19,200.00 19,200.00

21,000.00 2,100.00 2,100.00

80,000.00 4,000.00 4,000.00

110,000.00 5,500.00 5,500.00

120,000.00 600.00 600.00

125,000.00 375.00 375.00

Jumlah 31,775.00 21,300.00 10,475.00

20,000.00 21,000.00 21,000.00

21,000.00 210.00 210.00

80,000.00 4,000.00 4,000.00

110,000.00 5,500.00 5,500.00

120,000.00 600.00 600.00

125,000.00 375.00 375.00

Jumlah 31,685.00 21,210.00 10,475.00

3 4

17,500.00 18,375.00 18,375.00

21,000.00 210.00 210.00

80,000.00 4,000.00 4,000.00

110,000.00 5,500.00 5,500.00

120,000.00 600.00 600.00

125,000.00 375.00 375.00

Jumlah 29,060.00 18,585.00 10,475.00

10,000.00 10,500.00 10,500.00

Page 182: Analis Cipta Karya 2012-8 FEB 2012

21,000.00 210.00 210.00

80,000.00 4,000.00 4,000.00

110,000.00 5,500.00 5,500.00

120,000.00 600.00 600.00

125,000.00 375.00 375.00

Jumlah 21,185.00 10,710.00 10,475.00

3 4

3,250,000.00 3,575,000.00 3,575,000.00

21,000.00 26,250.00 26,250.00

40,000.00 40,000.00 40,000.00

80,000.00 560,000.00 560,000.00

110,000.00 2,310,000.00 2,310,000.00

120,000.00 252,000.00 252,000.00

125,000.00 43,750.00 43,750.00

Jumlah 6,807,000.00 3,641,250.00 3,165,750.00

3,500,000.00 84,000.00 84,000.00

40,000.00 12,000.00 12,000.00

80,000.00 64,000.00 64,000.00

110,000.00 264,000.00 264,000.00

120,000.00 28,800.00 28,800.00

125,000.00 5,000.00 5,000.00

Jumlah 457,800.00 96,000.00 361,800.00

457,800.00 457,800.00 96,000.00 361,800.00

234,093.75 234,093.75 214,500.00 19,593.75

Jumlah 691,893.75 310,500.00 381,393.75

3 4

195,000.00 214,500.00 214,500.00 80,000.00 1,200.00 1,200.00 110,000.00 16,500.00 16,500.00 120,000.00 1,800.00 1,800.00 125,000.00 93.75 93.75

Jumlah 234,093.75 214,500.00 19,593.75

Page 183: Analis Cipta Karya 2012-8 FEB 2012

3,500,000.00 84,000.00 84,000.00

195,000.00 214,500.00 214,500.00

40,000.00 12,000.00 80,000.00 24,000.00 24,000.00

110,000.00 264,000.00 264,000.00

120,000.00 28,800.00 28,800.00

125,000.00 5,000.00 5,000.00

Jumlah 632,300.00 298,500.00 321,800.00

3,500,000.00 140,000.00 140,000.00

40,000.00 20,000.00 20,000.00

80,000.00 80,000.00 80,000.00

110,000.00 330,000.00 330,000.00

120,000.00 36,000.00 36,000.00

125,000.00 6,250.00 6,250.00

Jumlah 612,250.00 160,000.00 452,250.00

3,500,000.00 224,000.00 224,000.00

40,000.00 20,000.00 20,000.00

80,000.00 80,000.00 80,000.00

110,000.00 330,000.00 330,000.00

120,000.00 36,000.00 36,000.00

125,000.00 6,250.00 6,250.00

Jumlah 696,250.00 244,000.00 452,250.00

3,500,000.00 52,500.00 52,500.00

40,000.00 20,000.00 20,000.00

165,845.00 212,281.60 212,281.60

375,000.00 393,750.00 393,750.00

20,000.00 5,000.00 5,000.00

80,000.00 80,000.00 80,000.00

110,000.00 330,000.00 330,000.00

120,000.00 36,000.00 36,000.00

125,000.00 6,250.00 6,250.00

Jumlah 1,135,781.60 683,531.60 452,250.00

341,250.00 609,131.25 609,131.25

80,000.00 80,000.00 80,000.00

110,000.00 330,000.00 330,000.00

120,000.00 36,000.00 36,000.00

125,000.00 6,250.00 6,250.00

Jumlah 1,061,381.25 609,131.25 452,250.00

Page 184: Analis Cipta Karya 2012-8 FEB 2012

223,000.00 245,300.00 245,300.00

2,400.00 4,800.00 4,800.00

45,000.00 2,700.00 2,700.00

80,000.00 3,440.00 3,440.00

110,000.00 4,730.00 4,730.00

120,000.00 516.00 516.00

125,000.00 262.50 262.50

Jumlah 261,748.50 252,800.00 8,948.50

540,000.00 594,000.00 594,000.00

80,000.00 3,440.00 3,440.00

110,000.00 4,730.00 4,730.00

120,000.00 516.00 516.00

125,000.00 262.50 262.50

Jumlah 602,948.50 594,000.00 8,948.50

3 4

612,250.00 1,248,990.00 326,400.00 922,590.00

1,500,000.00 6,120,000.00 6,120,000.00

165,845.00 676,647.60 470,097.60 206,550.00

Jumlah 8,045,637.60 6,916,497.60 1,129,140.00

2,398,682.60 25,402,048.73 23,374,857.98 2,027,190.75

261,748.50 7,747,755.60 7,482,880.00 264,875.60

25,000.00 740,000.00 740,000.00

540,000.00 3,904,200.00 3,904,200.00

1,061,381.25 2,122,762.50 1,218,262.50 904,500.00

2,750,000.00 5,500,000.00 5,500,000.00

1,250,000.00 2,500,000.00 2,500,000.00

250,000.00 500,000.00 500,000.00

Jumlah 48,416,766.83 45,220,200.48 3,196,566.35

2,398,682.60 34,541,029.44 31,784,509.44 2,756,520.00

8,045,637.60 57,928,590.72 49,798,782.72 8,129,808.00

79,593.75 955,125.00 720,000.00 235,125.00 323,375.00 646,750.00 490,000.00 156,750.00 294,593.75 1,178,375.00 1,100,000.00 78,375.00 188,425.00 376,850.00 240,000.00 136,850.00 605,312.50 2,421,250.00 2,160,000.00 261,250.00

Jumlah 98,047,970.16 86,293,292.16 11,754,678.00

Page 185: Analis Cipta Karya 2012-8 FEB 2012

3,500,000.00 87,500.00 87,500.00

40,000.00 20,000.00 20,000.00

21,000.00 630.00 630.00

97,000.00 97,000.00 97,000.00

100,000.00 50,000.00 50,000.00

80,000.00 64,000.00 64,000.00

110,000.00 264,000.00 264,000.00

120,000.00 28,800.00 28,800.00

125,000.00 5,000.00 5,000.00

Jumlah 616,930.00 255,130.00 361,800.00

3,500,000.00 87,500.00 87,500.00

40,000.00 20,000.00 20,000.00

80,000.00 2,400.00 2,400.00

97,000.00 97,000.00 97,000.00

80,000.00 64,000.00 64,000.00

110,000.00 264,000.00 264,000.00

120,000.00 28,800.00 28,800.00

125,000.00 5,000.00 5,000.00

Jumlah 568,700.00 206,900.00 361,800.00

612,250.00 146,940.00 38,400.00 108,540.00 34,593.75 138,375.00 29,393.75 58,787.50 61,393.75 61,393.75 15,000.00 30,000.00 30,000.00

99,725.00 53,851.50 26,514.00 27,337.50

Jumlah 489,347.75

4.00

8,500,000.00 8,500,000.00 8,500,000.00

75,000.00 37,500.00 37,500.00

25,000.00 200,000.00 200,000.00

250,000.00 500,000.00 500,000.00

125,000.00 125,000.00 125,000.00

75,000.00 150,000.00 150,000.00

862,360.19 31,044.97 26,440.57 4,604.40

34,650.00 20,790.00 3,120.00 17,670.00

65,233.40 39,140.04 12,635.04 26,505.00

80,000.00 480,000.00 480,000.00

110,000.00 880,000.00 880,000.00

120,000.00 96,000.00 96,000.00

125,000.00 25,000.00 25,000.00

Jumlah 1,721,975.01 192,195.61 1,529,779.40

Page 186: Analis Cipta Karya 2012-8 FEB 2012

20,000.00 123,540.00 123,540.00

4,071.50 110,044.50 88,381.56 21,662.94 80,000.00 133,600.00 133,600.00

110,000.00 183,700.00 183,700.00

120,000.00 2,004.00 2,004.00

125,000.00 10,375.00 10,375.00

Jumlah 563,263.50 211,921.56 351,341.94

135,000.00 202,500.00 202,500.00

110,000.00 132,000.00 132,000.00

800,000.00 220,000.00 220,000.00

128,000.00 140,800.00 140,800.00

100,000.00 100,000.00 100,000.00

4,071.50 1,498,312.00 1,203,360.00 294,952.00 80,000.00 133,600.00 133,600.00

110,000.00 183,700.00 183,700.00

120,000.00 2,004.00 2,004.00

125,000.00 10,375.00 10,375.00

Jumlah 2,623,291.00 1,998,660.00 624,631.00

3,250,000.00 3,575,000.00 3,575,000.00

20,000.00 300,000.00 300,000.00

21,000.00 117,600.00 117,600.00

80,000.00 320,000.00 320,000.00

110,000.00 1,320,000.00 1,320,000.00

120,000.00 144,000.00 144,000.00

125,000.00 25,000.00 25,000.00

Jumlah 5,801,600.00 3,992,600.00 1,809,000.00

3,250,000.00 3,900,000.00 3,900,000.00

20,000.00 300,000.00 300,000.00

21,000.00 117,600.00 117,600.00

80,000.00 536,000.00 536,000.00

110,000.00 2,211,000.00 2,211,000.00

120,000.00 241,200.00 241,200.00

125,000.00 41,875.00 41,875.00

Jumlah 7,347,675.00 4,317,600.00 3,030,075.00

Page 187: Analis Cipta Karya 2012-8 FEB 2012

3 4

3,250,000.00 3,575,000.00 3,575,000.00

20,000.00 300,000.00 300,000.00

21,000.00 63,000.00 63,000.00

80,000.00 192,000.00 192,000.00

110,000.00 792,000.00 792,000.00

120,000.00 86,400.00 86,400.00

125,000.00 15,000.00 15,000.00

Jumlah 5,023,400.00 3,938,000.00 1,085,400.00

2,180,000.00 2,398,000.00 2,398,000.00

20,000.00 300,000.00 300,000.00

21,000.00 63,000.00 63,000.00

80,000.00 192,000.00 192,000.00

110,000.00 792,000.00 792,000.00

120,000.00 86,400.00 86,400.00

125,000.00 15,000.00 15,000.00

Jumlah 3,846,400.00 2,761,000.00 1,085,400.00

15,000.00 15,750.00 15,750.00

80,000.00 12,000.00 12,000.00

110,000.00 5,500.00 5,500.00

120,000.00 600.00 600.00

125,000.00 1,000.00 1,000.00

Jumlah 34,850.00 15,750.00 19,100.00

25,000.00 26,250.00 26,250.00

17,000.00 17,850.00 17,850.00

80,000.00 12,000.00 12,000.00

110,000.00 5,500.00 5,500.00

120,000.00 600.00 600.00

125,000.00 1,000.00 1,000.00

Jumlah 63,200.00 44,100.00 19,100.00

135,000.00 177,187.50 177,187.50

27,500.00 550.00 550.00

80,000.00 12,000.00 12,000.00

110,000.00 82,500.00 82,500.00

120,000.00 960.00 960.00

125,000.00 750.00 750.00

Jumlah 273,947.50 177,737.50 96,210.00 371,997.50 355,475.00 192,420.00

240,000.00 80,640.00

Page 188: Analis Cipta Karya 2012-8 FEB 2012

20,000.00 400.00 18,000.00 3,600.00 275.00 2,750.00 115,000.00 14,375.00 80,000.00 8,000.00 4,600.00 110,000.00 5,500.00 27,600.00 120,000.00 600.00 125,000.00 625.00 3,000.00 3,000.00

Jumlah 119,490.00 #REF!

175,000.00 533,750.00 80,000.00 12,000.00 110,000.00 22,000.00 120,000.00 2,400.00 125,000.00 187.50 2,500.00 2,500.00

Jumlah 572,837.50 485,395.00

51,625.00 149,712.50 (2,950.86) 80,000.00 24,000.00 110,000.00 22,000.00 120,000.00 2,400.00 125,000.00 1,875.00 1,000.00 1,000.00

Jumlah 200,987.50 893,315.00 884,757.50 (8,557.50)

- - - - 110,000.00 33,000.00 120,000.00 24,000.00 125,000.00 2,500.00 Jumlah #VALUE!

Jumlah #VALUE!

PASANG NOK ATAP ALUMUNIUM (SPANDEK/SUPER DEK 65,000.00 78,000.00 78,000.00

27,500.00 1,100.00 1,100.00

80,000.00 8,000.00 8,000.00

110,000.00 110,000.00 110,000.00

120,000.00 1,200.00 1,200.00

Page 189: Analis Cipta Karya 2012-8 FEB 2012

125,000.00 1,250.00 1,250.00

Jumlah 199,550.00 79,100.00 120,450.00

20,500.00 23,575.00 23,575.00

80,000.00 4,800.00 4,800.00

110,000.00 6,600.00 6,600.00

120,000.00 720.00 720.00

125,000.00 375.00 375.00

Jumlah 36,070.00 23,575.00 12,495.00

3 4

20,000.00 23,000.00 23,000.00

80,000.00 4,800.00 4,800.00

110,000.00 6,600.00 6,600.00

120,000.00 720.00 720.00

125,000.00 375.00 375.00

Jumlah 35,495.00 23,000.00 12,495.00

7,000.00 7,000.00 7,000.00

35,000.00 3,500.00 3,500.00

80,000.00 8,000.00 8,000.00

110,000.00 11,000.00 11,000.00

120,000.00 120.00 120.00

125,000.00 625.00 625.00

6,250.00 5,000.00 5,000.00

Jumlah 35,245.00 10,500.00 24,745.00 Untuk 1 Kg 352.45 105.00 247.45

36,070.00 36,070.00 23,575.00 12,495.00 352.45 352.45 105.00 247.45

Jumlah 36,422.45 23,680.00 12,742.45

2,180,000.00 8,643,700.00 8,643,700.00

21,000.00 208,162.50 208,162.50

80,000.00 1,920,000.00 1,920,000.00

110,000.00 440,000.00 440,000.00

110,000.00 660,000.00 660,000.00

120,000.00 240,000.00 240,000.00

125,000.00 75,000.00 75,000.00

Jumlah 12,186,862.50 8,851,862.50 3,335,000.00

Page 190: Analis Cipta Karya 2012-8 FEB 2012

3,500,000.00 38,500.00 38,500.00

21,000.00 1,050.00 1,050.00

80,000.00 8,000.00 8,000.00

110,000.00 22,000.00 22,000.00

120,000.00 2,400.00 2,400.00

125,000.00 625.00 625.00

Jumlah 72,575.00 39,550.00 33,025.00

2,900.00 165,300.00 165,300.00

235,000.00 23,500.00 23,500.00

80,000.00 24,000.00 24,000.00

110,000.00 22,000.00 22,000.00

120,000.00 2,400.00 2,400.00

125,000.00 250.00 250.00

Jumlah 237,450.00 188,800.00 48,650.00

75,000.00 30,000.00 30,000.00

6,000.00 1,800.00 1,800.00

22,500.00 900.00 900.00

80,000.00 3,200.00 3,200.00

110,000.00 2,200.00 2,200.00

120,000.00 240.00 240.00

125,000.00 250.00 250.00

12,500.00 2,125.00 2,125.00

Jumlah 40,715.00 32,700.00 8,015.00 Untuk 1 cm 4,071.50 3,270.00 801.50

20,000.00 80,000.00 80,000.00

20,000.00 38,000.00 38,000.00

4,071.50 32,572.00 26,160.00 6,412.00

80,000.00 44,800.00 44,800.00

110,000.00 61,600.00 61,600.00

120,000.00 6,720.00 6,720.00

125,000.00 1,037.50 1,037.50

Jumlah 264,729.50 144,160.00 120,569.50 288,320.00 241,139.00

434,000.00 173,166.00 173,166.00

292,000.00 292,000.00 292,000.00

100,000.00 1,175,000.00 1,175,000.00

20,000.00 3,140.00 3,140.00

12,000.00 120,000.00 120,000.00

360,000.00 56,808.00 56,808.00

Page 191: Analis Cipta Karya 2012-8 FEB 2012

40,000.00 12,628.00 12,628.00

12,000.00 180,000.00 180,000.00

7,500.00 75,000.00 75,000.00

4,071.50 1,139,002.13 914,782.50 224,219.63

80,000.00 96,000.00 96,000.00

110,000.00 132,000.00 132,000.00

120,000.00 14,400.00 14,400.00

125,000.00 750.00 750.00

Jumlah 3,469,894.13 3,002,524.50 467,369.63

292,000.00 321,200.00 321,200.00

200,000.00 100,000.00 100,000.00

20,000.00 3,140.00 3,140.00

7,500.00 15,000.00 15,000.00

4,071.50 160,824.25 129,165.00 31,659.25

80,000.00 96,000.00 96,000.00

110,000.00 132,000.00 132,000.00

120,000.00 14,400.00 14,400.00

125,000.00 750.00 750.00

Jumlah 843,314.25 568,505.00 274,809.25

200,000.00 480,000.00 480,000.00

166,000.00 1,045,800.00 1,045,800.00

133,000.00 159,600.00 159,600.00

4,071.50 697,447.95 560,151.00 137,296.95

80,000.00 133,600.00 133,600.00

110,000.00 183,700.00 183,700.00

120,000.00 20,040.00 20,040.00

125,000.00 10,375.00 10,375.00

Jumlah 2,730,562.95 2,245,551.00 485,011.95

200,000.00 1,785,000.00 1,785,000.00

166,000.00 4,444,650.00 4,444,650.00

133,000.00 678,300.00 678,300.00

2,650,000.00 2,650,000.00 2,650,000.00

100,000.00 300,000.00 300,000.00

4,071.50 3,778,352.00 3,034,560.00 743,792.00

80,000.00 567,800.00 567,800.00

110,000.00 780,725.00 780,725.00

120,000.00 85,164.00 85,164.00

125,000.00 44,087.50 44,087.50

Jumlah 15,114,078.50 12,892,510.00 2,221,568.50

63,125.00 25,849.69 - 25,849.69 21,041.67 2,152.56 - 2,152.56

Page 192: Analis Cipta Karya 2012-8 FEB 2012

241,250.00 7,237.50 6,480.00 757.50 1,203,875.00 108,348.75 88,470.00 19,878.75 862,360.19 34,494.41 29,378.41 5,116.00 62,021.60 99,234.56 28,554.56 70,680.00 34,650.00 34,650.00 5,200.00 29,450.00 Jumlah 311,967.47 158,082.97 153,884.50

63,125.00 15,781.25 15,781.25 21,041.67 1,315.10 1,315.10 241,250.00 6,031.25 5,400.00 631.25 1,985,308.31 446,694.37 397,167.57 49,526.80 394,735.00 315,788.00 238,040.00 77,748.00 62,021.60 74,425.92 21,415.92 53,010.00 65,233.40 78,280.08 25,270.08 53,010.00 36,070.00 1,766,636.46 1,154,656.35 611,980.11 Jumlah 2,704,952.43 1,841,949.92 863,002.52

63,125.00 60,600.00 60,600.00 21,041.67 5,050.00 5,050.00 241,250.00 28,950.00 25,920.00 3,030.00 792,615.00 190,227.60 162,662.40 27,565.20 1,203,875.00 577,860.00 471,840.00 106,020.00 862,360.19 103,483.22 88,135.22 15,348.00 62,021.60 186,064.80 53,539.80 132,525.00 34,650.00 103,950.00 15,600.00 88,350.00

Jumlah 1,256,185.62 817,697.42 438,488.20

50,000.00 60,000.00 60,000.00

10,000.00 77,000.00 77,000.00

99,725.00 39,890.00 19,640.00 20,250.00 Jumlah 176,890.00 156,640.00 20,250.00

1,600.00 20,000.00 20,000.00

1,000.00 25,000.00 25,000.00

235,000.00 235.00 235.00

80,000.00 60,000.00 60,000.00

110,000.00 110,000.00 110,000.00

120,000.00 60,000.00 60,000.00

125,000.00 12,500.00 12,500.00

Jumlah 287,735.00 45,235.00 242,500.00

862,360.19 86,236.02 73,446.02 12,790.00 62,021.60 136,447.52 39,262.52 97,185.00 34,650.00 76,230.00 11,440.00 64,790.00

Page 193: Analis Cipta Karya 2012-8 FEB 2012

Jumlah 298,913.54 124,148.54 174,765.00

7,565,639.07 1,891,409.77 1,551,985.06 339,424.71 62,021.60 105,436.72 30,339.22 75,097.50

Jumlah 1,996,846.49 1,582,324.28 414,522.21

63,125.00 1,348,665.63 1,348,665.63 21,041.67 134,866.56 134,866.56 241,250.00 91,675.00 82,080.00 9,595.00 1,203,875.00 1,467,523.63 1,198,277.00 269,246.63 1,217,800.00 2,708,387.20 1,861,599.20 846,788.00 862,360.19 187,994.52 160,112.32 27,882.20 6,461,561.47 3,553,858.81 2,786,931.60 766,927.21 9,426,562.57 3,959,156.28 3,436,076.68 523,079.59 62,021.60 1,550,540.00 446,165.00 1,104,375.00 325,250.00 145,712.00 134,400.00 11,312.00 1,250,000.00 652,500.00 652,500.00

73,062.50 292,250.00 153,600.00 138,650.00 209,525.00 209,525.00 138,000.00 71,525.00 Jumlah 16,302,654.62 11,049,741.80 5,252,912.82

875,000.00 52,500.00 52,500.00

80,000.00 16,000.00 16,000.00

125,000.00 2,375.00 2,375.00

4,700,000.00 21,150.00 21,150.00

Jumlah 92,025.00 73,650.00 18,375.00

175,000.00 210,000.00 210,000.00

80,000.00 24,000.00 24,000.00

125,000.00 1,250.00 1,250.00

4,700,000.00 21,150.00 21,150.00

Jumlah 256,400.00 231,150.00 25,250.00

3 4

1m2 51,280.00

850,000.00 3,060,000.00 3,060,000.00

875,000.00 2,100,000.00 2,100,000.00

900,000.00 1,080,000.00 1,080,000.00

235,000.00 470,000.00 470,000.00

11,354.84 1,362,580.65 1,362,580.65

450,000.00 450,000.00 450,000.00

80,000.00 600,000.00 600,000.00

Page 194: Analis Cipta Karya 2012-8 FEB 2012

125,000.00 46,875.00 46,875.00

4,700,000.00 3,102,000.00 3,102,000.00

Jumlah 12,271,455.65 8,522,580.65 3,748,875.00 Untuk 1 M2 122,714.56 85,225.81 37,488.75

GROUND RESERVOAR BAWAH WING KANAN BANGUNAN 127,500.00 1,785,000.00 1,785,000.00 21,041.67 25,250.00 25,250.00

4,772,681.31 10,118,084.37 10,742,354.51 2,956,155.79 6,461,561.47 2,326,162.13 1,824,173.41 501,988.72

12,216,943.97 2,638,859.90 1,094,504.04 301,193.23

7,225,115.00 26,588,423.20 18,647,105.95 5,131,440.24

9,480,302.18 7,584,241.74 4,053,718.68 1,115,530.49

10,183,367.50 2,932,809.84 1,459,338.73 401,590.98

862,360.19 689,888.15 587,568.15 102,320.00

65,233.40 521,867.20 168,467.20 353,400.00

62,021.60 2,282,394.88 656,754.88 1,625,640.00 235,190.00 7,526,080.00 4,227,680.00 3,298,400.00 500,000.00 500,000.00 1,500,000.00 500,000.00 500,000.00 750,000.00

Jumlah 66,019,061.40 45,711,665.55 17,597,909.45

1,000,000.00 800,000.00 800,000.00

875,000.00 2,100,000.00 2,100,000.00

900,000.00 1,080,000.00 1,080,000.00

245,000.00 490,000.00 490,000.00

11,354.84 1,362,580.65 1,362,580.65

450,000.00 450,000.00 450,000.00

80,000.00 600,000.00 600,000.00

125,000.00 46,875.00 46,875.00

4,700,000.00 3,102,000.00 3,102,000.00

Jumlah 10,031,455.65 6,282,580.65 3,748,875.00 Untuk 1 M2 100,314.56 62,825.81 37,488.75

165,000.00 2,970,000.00 2,970,000.00 230,000.00 460,000.00 460,000.00 330,000.00 132,000.00 132,000.00 18,000.00 144,000.00 144,000.00 75,000.00 75,000.00 75,000.00 15,000.00 120,000.00 120,000.00 80,000.00 240,000.00 240,000.00 110,000.00 440,000.00 440,000.00 120,000.00 48,000.00 48,000.00 125,000.00 12,500.00 12,500.00 Jumlah 4,641,500.00 3,901,000.00 740,500.00

115,000.00 1,725,000.00 1,725,000.00

150,000.00 300,000.00 300,000.00

18,000.00 72,000.00 72,000.00

75,000.00 56,250.00 56,250.00

Page 195: Analis Cipta Karya 2012-8 FEB 2012

15,000.00 90,000.00 90,000.00

80,000.00 200,000.00 200,000.00

110,000.00 330,000.00 330,000.00

120,000.00 36,000.00 36,000.00

125,000.00 12,500.00 12,500.00

Jumlah 2,821,750.00 2,243,250.00 578,500.00 4,486,500.00 1,157,000.00

83,000.00 87,150.00 87,150.00

80,000.00 16,000.00 16,000.00

110,000.00 22,000.00 22,000.00

120,000.00 2,400.00 2,400.00

125,000.00 125.00 125.00

Jumlah 127,675.00 87,150.00 40,525.00

375,000.00 412,500.00 412,500.00

45,000.00 11,250.00 11,250.00

300.00 3,600.00 3,600.00

80,000.00 12,000.00 12,000.00

110,000.00 22,000.00 22,000.00

120,000.00 3,000.00 3,000.00

125,000.00 625.00 625.00

Jumlah 464,975.00 427,350.00 37,625.00

3 4

33,000.00 39,600.00 39,600.00

11,550.00 11,550.00 11,550.00

80,000.00 4,320.00 4,320.00

110,000.00 9,900.00 9,900.00

120,000.00 1,080.00 1,080.00

125,000.00 3,375.00 3,375.00

Jumlah 69,825.00 39,600.00 30,225.00

46,000.00 55,200.00 55,200.00

16,100.00 16,100.00 16,100.00

80,000.00 4,320.00 4,320.00

110,000.00 9,900.00 9,900.00

Page 196: Analis Cipta Karya 2012-8 FEB 2012

120,000.00 1,080.00 1,080.00

125,000.00 3,375.00 3,375.00

Jumlah 89,975.00 55,200.00 34,775.00

48,000.00 57,600.00 57,600.00

16,800.00 16,800.00 16,800.00

80,000.00 4,320.00 4,320.00

110,000.00 9,900.00 9,900.00

120,000.00 1,080.00 1,080.00

125,000.00 3,375.00 3,375.00

Jumlah 93,075.00 57,600.00 35,475.00

63,000.00 75,600.00 75,600.00

22,050.00 22,050.00 22,050.00

80,000.00 8,640.00 8,640.00

110,000.00 19,800.00 19,800.00

120,000.00 2,160.00 2,160.00

125,000.00 675.00 675.00

Jumlah 128,925.00 75,600.00 53,325.00

83,000.00 99,600.00 99,600.00

29,050.00 29,050.00 29,050.00

80,000.00 8,640.00 8,640.00

110,000.00 19,800.00 19,800.00

120,000.00 2,160.00 2,160.00

125,000.00 675.00 675.00

Jumlah 159,925.00 99,600.00 60,325.00

115,000.00 138,000.00 138,000.00

40,250.00 40,250.00 40,250.00

80,000.00 8,640.00 8,640.00

110,000.00 19,800.00 19,800.00

120,000.00 2,160.00 2,160.00

125,000.00 675.00 675.00

Jumlah 209,525.00 138,000.00 71,525.00

165,000.00 198,000.00 198,000.00

57,750.00 57,750.00 57,750.00

80,000.00 8,640.00 8,640.00

110,000.00 19,800.00 19,800.00

120,000.00 2,160.00 2,160.00

125,000.00 675.00 675.00

Jumlah 287,025.00 198,000.00 89,025.00

190,000.00 228,000.00 228,000.00

66,500.00 66,500.00 66,500.00

80,000.00 10,800.00 10,800.00

Page 197: Analis Cipta Karya 2012-8 FEB 2012

110,000.00 24,750.00 24,750.00

120,000.00 2,700.00 2,700.00

125,000.00 850.00 850.00

Jumlah 333,600.00 228,000.00 105,600.00

135,000.00 162,000.00 162,000.00

47,250.00 47,250.00 47,250.00

80,000.00 6,480.00 6,480.00

110,000.00 14,850.00 14,850.00

120,000.00 1,620.00 1,620.00

125,000.00 512.50 512.50

Jumlah 232,712.50 162,000.00 70,712.50

32,000.00 38,400.00 38,400.00

11,200.00 11,200.00 11,200.00

80,000.00 6,480.00 6,480.00

110,000.00 14,850.00 14,850.00

120,000.00 1,620.00 1,620.00

125,000.00 512.50 512.50

Jumlah 73,062.50 38,400.00 34,662.50

18,500.00 22,200.00 22,200.00 6,475.00 6,475.00 6,475.00 80,000.00 6,480.00 6,480.00 110,000.00 14,850.00 14,850.00 120,000.00 1,620.00 1,620.00 125,000.00 512.50 512.50

Jumlah 52,137.50 22,200.00 29,937.50

19,500.00 23,400.00 23,400.00 6,825.00 6,825.00 6,825.00 80,000.00 4,320.00 4,320.00 110,000.00 9,900.00 9,900.00 120,000.00 1,080.00 1,080.00 125,000.00 337.50 337.50 Jumlah 45,862.50 23,400.00 22,462.50

18,500.00 22,200.00 22,200.00 6,475.00 6,475.00 6,475.00 80,000.00 2,880.00 2,880.00 110,000.00 7,260.00 7,260.00 120,000.00 720.00 720.00 125,000.00 225.00 225.00

Jumlah 39,760.00 22,200.00 17,560.00

11,000.00 13,200.00 13,200.00 3,850.00 3,850.00 3,850.00 80,000.00 2,880.00 2,880.00 110,000.00 6,600.00 6,600.00 120,000.00 720.00 720.00 125,000.00 225.00 225.00

Jumlah 27,475.00 13,200.00 14,275.00

Page 198: Analis Cipta Karya 2012-8 FEB 2012

45,862.50 3,861,622.50

89,975.00 1,349,625.00

1,500,000.00 4,500,000.00

1,250,000.00 7,500,000.00

41,550,000.00 83,100,000.00

Jumlah 100,311,247.50

63,125.00 6,198,522.37

241,250.00 3,438,370.82

6,461,561.47 8,221,853.45

1,203,875.00 69,887,531.14

2,737,161.57 144,402,724.01

65,233.40 2,213,456.54

235,190.00 26,339,057.96

267,705.00 12,058,693.53

243,353.30 11,885,511.90

Jumlah 284,645,721.71

total 384,956,969.21

128,925.00 2,320,650.00 1,360,800.00 959,850.00 209,525.00 2,514,300.00 1,656,000.00 858,300.00 93,075.00 2,326,875.00 1,440,000.00 886,875.00 89,975.00 3,149,125.00 1,932,000.00 1,217,125.00 69,825.00 8,379,000.00 4,752,000.00 3,627,000.00

11,000.00 132,000.00 8,500.00 127,500.00 5,000.00 450,000.00

15,000.00 30,000.00 13,000.00 65,000.00 13,000.00 91,000.00

8,000.00 80,000.00 5,000.00 175,000.00

12,000.00 84,000.00 7,000.00 70,000.00 5,000.00 100,000.00

12,000.00 60,000.00 7,500.00 52,500.00 4,000.00 200,000.00

12,000.00 36,000.00 10,000.00 50,000.00 17,500.00 35,000.00 45,000.00 180,000.00 32,000.00 128,000.00 20,000.00 100,000.00 12,000.00 300,000.00

350,000.00 700,000.00 450,000.00 450,000.00 Jumlah 22,385,950.00 11,140,800.00 7,549,150.00

Page 199: Analis Cipta Karya 2012-8 FEB 2012

128,925.00 5,801,625.00 3,402,000.00 2,399,625.00 93,075.00 6,980,625.00 4,320,000.00 2,660,625.00 69,825.00 21,994,875.00 12,474,000.00 9,520,875.00

11,000.00 110,000.00 110,000.00

8,500.00 144,500.00 144,500.00

5,000.00 1,000,000.00 1,000,000.00

13,000.00 91,000.00 91,000.00

8,000.00 96,000.00 96,000.00

5,000.00 150,000.00 150,000.00

12,000.00 120,000.00 120,000.00

7,000.00 140,000.00 140,000.00

5,000.00 200,000.00 200,000.00

12,000.00 120,000.00 120,000.00

7,500.00 112,500.00 112,500.00

4,000.00 120,000.00 120,000.00

12,000.00 36,000.00 36,000.00

10,000.00 20,000.00 20,000.00

32,000.00 128,000.00 128,000.00

20,000.00 120,000.00 120,000.00

12,000.00 360,000.00 360,000.00

350,000.00 700,000.00 700,000.00

17,000.00 1,190,000.00 1,190,000.00

Jumlah 39,735,125.00 25,154,000.00 14,581,125.00

287,025.00 7,175,625.00 4,950,000.00 2,225,625.00 128,925.00 773,550.00 453,600.00 319,950.00 93,075.00 1,116,900.00 691,200.00 425,700.00

69,825.00 4,887,750.00 2,772,000.00 2,115,750.00 11,000.00 66,000.00 66,000.00

8,500.00 85,000.00 85,000.00

5,000.00 175,000.00 175,000.00

13,000.00 26,000.00 26,000.00

8,000.00 80,000.00 80,000.00

5,000.00 75,000.00 75,000.00

12,000.00 24,000.00 24,000.00

7,000.00 21,000.00 21,000.00

5,000.00 75,000.00 75,000.00

12,000.00 60,000.00 60,000.00

7,500.00 52,500.00 52,500.00

4,000.00 48,000.00 48,000.00

12,000.00 36,000.00 36,000.00

10,000.00 40,000.00 40,000.00

32,000.00 64,000.00 64,000.00

20,000.00 80,000.00 80,000.00

12,000.00 180,000.00 180,000.00

1,750,000.00 3,500,000.00 3,500,000.00

350,000.00 350,000.00 350,000.00

17,000.00 850,000.00 850,000.00

19,841,325.00 14,754,300.00 5,087,025.00

Page 200: Analis Cipta Karya 2012-8 FEB 2012

73,062.50 5,845,000.00 3,072,000.00 2,773,000.0052,137.50 3,649,625.00 1,554,000.00 2,095,625.0045,862.50 1,375,875.00 702,000.00 673,875.0039,760.00 477,120.00 266,400.00 210,720.0027,475.00 329,700.00 158,400.00 171,300.0030,000.00 1,050,000.00 1,050,000.00

15,000.00 300,000.00 300,000.00

10,000.00 100,000.00 100,000.00

7,000.00 280,000.00 280,000.00

30,000.00 300,000.00 300,000.00

75,000.00 600,000.00 600,000.00

30,000.00 360,000.00 360,000.00

90,000.00 720,000.00 720,000.00

30,000.00 150,000.00 150,000.00

20,000.00 100,000.00 100,000.00

15,000.00 90,000.00 90,000.00

35,000.00 525,000.00 525,000.00

10,000.00 200,000.00 200,000.00

30,000.00 900,000.00 900,000.00

12,000.00 120,000.00 120,000.00

40,000.00 120,000.00 120,000.00

Jumlah 17,592,320.00 11,667,800.00 5,924,520.00

3 4

73,062.50 25,571,875.00 13,440,000.00 12,131,875.0052,137.50 5,213,750.00 2,220,000.00 2,993,750.0045,862.50 5,503,500.00 2,808,000.00 2,695,500.0039,760.00 3,180,800.00 1,776,000.00 1,404,800.0027,475.00 686,875.00 330,000.00 356,875.0030,000.00 1,500,000.00 1,500,000.00

15,000.00 1,125,000.00 1,125,000.00

10,000.00 250,000.00 250,000.00

7,000.00 210,000.00 210,000.00

30,000.00 1,110,000.00 1,110,000.00

22,000.00 330,000.00 330,000.00

10,000.00 150,000.00 150,000.00

6,500.00 130,000.00 130,000.00

75,000.00 900,000.00 900,000.00

30,000.00 600,000.00 600,000.00

90,000.00 2,250,000.00 2,250,000.00

30,000.00 300,000.00 300,000.00

20,000.00 300,000.00 300,000.00

15,000.00 150,000.00 150,000.00

35,000.00 525,000.00 525,000.00

Page 201: Analis Cipta Karya 2012-8 FEB 2012

10,000.00 250,000.00 250,000.00

22,000.00 660,000.00 660,000.00

30,000.00 1,350,000.00 1,350,000.00

12,000.00 300,000.00 300,000.00

40,000.00 400,000.00 400,000.00

Jumlah (b) 52,946,800.00 33,364,000.00 19,582,800.00

73,062.50 2,191,875.00 1,152,000.00 1,039,875.0052,137.50 782,062.50 333,000.00 449,062.5045,862.50 1,146,562.50 585,000.00 561,562.5039,760.00 318,080.00 177,600.00 140,480.0027,475.00 109,900.00 52,800.00 57,100.0030,000.00 600,000.00 600,000.00

15,000.00 300,000.00 300,000.00

10,000.00 100,000.00 100,000.00

7,000.00 35,000.00 35,000.00

30,000.00 60,000.00 60,000.00

75,000.00 225,000.00 225,000.00

30,000.00 120,000.00 120,000.00

90,000.00 270,000.00 270,000.00

30,000.00 60,000.00 60,000.00

20,000.00 80,000.00 80,000.00

15,000.00 30,000.00 30,000.00

35,000.00 140,000.00 140,000.00

25,000.00 150,000.00 150,000.00

10,000.00 60,000.00 60,000.00

22,000.00 110,000.00 110,000.00

30,000.00 180,000.00 180,000.00

12,000.00 24,000.00 24,000.00

Jumlah (b) 7,092,480.00 4,844,400.00 2,248,080.00

245,000.00 245,000.00 245,000.00

80,000.00 4,800.00 4,800.00

110,000.00 66,000.00 66,000.00

120,000.00 7,200.00 7,200.00

125,000.00 375.00 375.00

Jumlah 323,375.00 245,000.00 78,375.00

200,000.00 200,000.00 200,000.00

80,000.00 800.00 800.00

110,000.00 55,000.00 55,000.00

120,000.00 1,200.00 1,200.00

125,000.00 625.00 625.00

Jumlah 257,625.00 200,000.00 57,625.00

Page 202: Analis Cipta Karya 2012-8 FEB 2012

148,000.00 148,000.00 148,000.00

80,000.00 400.00 400.00

110,000.00 55,000.00 55,000.00

120,000.00 600.00 600.00

125,000.00 31.25 31.25

Jumlah 204,031.25 148,000.00 56,031.25

28,000.00 28,000.00 28,000.00

80,000.00 1,200.00 1,200.00

110,000.00 16,500.00 16,500.00

120,000.00 1,800.00 1,800.00

125,000.00 93.75 93.75

Jumlah 47,593.75 28,000.00 19,593.75

60,000.00 60,000.00 60,000.00 80,000.00 1,200.00 1,200.00 110,000.00 16,500.00 16,500.00 120,000.00 1,800.00 1,800.00 125,000.00 93.75 93.75 Jumlah 79,593.75 60,000.00 19,593.75

15,000.00 15,000.00 15,000.00

80,000.00 1,200.00 1,200.00

110,000.00 16,500.00 16,500.00

120,000.00 1,800.00 1,800.00

125,000.00 93.75 93.75

Jumlah 34,593.75 15,000.00 19,593.75

9,800.00 9,800.00 9,800.00

32,000.00 32,000.00 32,000.00

80,000.00 1,200.00 1,200.00

110,000.00 16,500.00 16,500.00

120,000.00 1,800.00 1,800.00

125,000.00 93.75 93.75

Jumlah 61,393.75 41,800.00 19,593.75

40,000.00 40,000.00 40,000.00

80,000.00 800.00 800.00

110,000.00 11,000.00 11,000.00

120,000.00 1,200.00 1,200.00

125,000.00 62.50 62.50

Jumlah 53,062.50 40,000.00 13,062.50

9,800.00 9,800.00 9,800.00

80,000.00 1,200.00 1,200.00

110,000.00 16,500.00 16,500.00

120,000.00 1,800.00 1,800.00

Page 203: Analis Cipta Karya 2012-8 FEB 2012

125,000.00 93.75 93.75

Jumlah 29,393.75 9,800.00 19,593.75

120,000.00 120,000.00 120,000.00

80,000.00 800.00 800.00

110,000.00 55,000.00 55,000.00

120,000.00 12,000.00 12,000.00

125,000.00 625.00 625.00

Jumlah 188,425.00 120,000.00 68,425.00

275,000.00 275,000.00 275,000.00

80,000.00 1,200.00 1,200.00

110,000.00 16,500.00 16,500.00

120,000.00 1,800.00 1,800.00

125,000.00 93.75 93.75

Jumlah 294,593.75 275,000.00 19,593.75

540,000.00 540,000.00 540,000.00

80,000.00 4,000.00 4,000.00

110,000.00 55,000.00 55,000.00

120,000.00 6,000.00 6,000.00

125,000.00 312.50 312.50

Jumlah 605,312.50 540,000.00 65,312.50

82,000.00 82,000.00 82,000.00

80,000.00 800.00 800.00

110,000.00 11,000.00 11,000.00

120,000.00 1,200.00 1,200.00

125,000.00 62.50 62.50

Jumlah 95,062.50 82,000.00 13,062.50

2,325,000.00 2,325,000.00 2,325,000.00

139,500.00 139,500.00 139,500.00

80,000.00 264,000.00 264,000.00

110,000.00 121,000.00 121,000.00

120,000.00 120.00 120.00

125,000.00 20,000.00 20,000.00

Jumlah 2,869,620.00 2,325,000.00 544,620.00

55,000.00 55,000.00 55,000.00

2,400.00 16,800.00 16,800.00

1,600.00 9,600.00 9,600.00

235,000.00 2,350.00 2,350.00

80,000.00 80,000.00 80,000.00

110,000.00 165,000.00 165,000.00

120,000.00 36,000.00 36,000.00

Page 204: Analis Cipta Karya 2012-8 FEB 2012

125,000.00 13,750.00 13,750.00

Jumlah 378,500.00 83,750.00 294,750.00

3 4

5,200,000.00 5,200,000.00 5,200,000.00

1,040,000.00 1,040,000.00 1,040,000.00

80,000.00 - -

110,000.00 8,250.00 8,250.00

120,000.00 90,000.00 90,000.00

125,000.00 31,250.00 31,250.00

Jumlah 6,369,500.00 6,240,000.00 129,500.00

2,300,000.00 2,300,000.00 2,300,000.00

276,000.00 276,000.00 276,000.00

1,600.00 9,600.00 9,600.00

235,000.00 2,350.00 2,350.00

80,000.00 96,000.00 96,000.00

110,000.00 159,500.00 159,500.00

120,000.00 18,000.00 18,000.00

125,000.00 12,500.00 12,500.00

Jumlah 2,873,950.00 2,587,950.00 286,000.00

2,675,000.00 2,675,000.00 2,675,000.00

321,000.00 321,000.00 321,000.00

1,600.00 9,600.00 9,600.00

235,000.00 2,350.00 2,350.00

80,000.00 96,000.00 96,000.00

110,000.00 159,500.00 159,500.00

120,000.00 18,000.00 18,000.00

125,000.00 12,500.00 12,500.00

Jumlah 3,293,950.00 3,007,950.00 286,000.00

3,550,000.00 3,550,000.00 3,550,000.00

213,000.00 213,000.00 213,000.00

80,000.00 - -

110,000.00 8,250.00 8,250.00

120,000.00 90,000.00 90,000.00

125,000.00 31,250.00 31,250.00

Jumlah 3,892,500.00 3,763,000.00 129,500.00

4,335,450.00 4,335,450.00 4,335,450.00

520,254.00 520,254.00 520,254.00

80,000.00 144,000.00 144,000.00

110,000.00 297,000.00 297,000.00

120,000.00 64,800.00 64,800.00

Page 205: Analis Cipta Karya 2012-8 FEB 2012

125,000.00 13,750.00 13,750.00

Jumlah 5,375,254.00 4,855,704.00 519,550.00

300,000.00 300,000.00 300,000.00

36,000.00 36,000.00 36,000.00

80,000.00 132,000.00 132,000.00

110,000.00 60,500.00 60,500.00

120,000.00 660.00 660.00

125,000.00 10,000.00 10,000.00

Jumlah 539,160.00 336,000.00 203,160.00

2,400,000.00 2,400,000.00 2,400,000.00

720,000.00 720,000.00 720,000.00

1,600.00 9,600.00 9,600.00

235,000.00 2,350.00 2,350.00

80,000.00 80,000.00 80,000.00

110,000.00 110,000.00 110,000.00

120,000.00 12,000.00 12,000.00

125,000.00 12,500.00 12,500.00

Jumlah 3,346,450.00 3,131,950.00 214,500.00

3 4

7,750,000.00 7,750,000.00 7,750,000.00

465,000.00 465,000.00 465,000.00

80,000.00 144,000.00 144,000.00

110,000.00 297,000.00 297,000.00

120,000.00 64,800.00 64,800.00

125,000.00 13,750.00 13,750.00

Jumlah 8,734,550.00 8,215,000.00 519,550.00

5,250,000.00 5,250,000.00 5,250,000.00

315,000.00 315,000.00 315,000.00

80,000.00 144,000.00 144,000.00

110,000.00 297,000.00 297,000.00

120,000.00 64,800.00 64,800.00

125,000.00 13,750.00 13,750.00

Jumlah 6,084,550.00 5,565,000.00 519,550.00

232,712.50 255,983.75 93,075.00 102,382.50 159,925.00 175,917.50 63,125.00 37,875.00 1,500,000.00 1,500,000.00 0.2500

80,000.00 80,000.00 0.1500

110,000.00 85,201.74

Page 206: Analis Cipta Karya 2012-8 FEB 2012

120,000.00 60,000.00 125,000.00 6,250.00 Jumlah 2,303,610.49

63,125.00 39,390.00 0.90

241,250.00 11,580.00 325,250.00 32,525.00 182,170.00 306,045.60 1,519,029.44 2,551,969.47 99,883.40 24,970.85 850,000.00 850,000.00

Jumlah 3,816,480.92

20,000.00 90,000.00 90,000.00

17,000.00 170,000.00 170,000.00

7,500.00 37,500.00 37,500.00

5,000.00 17,500.00 17,500.00

4,500.00 9,000.00 9,000.00

4,500.00 9,000.00 9,000.00

700.00 2,800.00 2,800.00

2,400.00 2,400.00 2,400.00

1,700.00 5,100.00 5,100.00

10,000.00 2,500.00 2,500.00

80,000.00 60,000.00 60,000.00

110,000.00 55,000.00 55,000.00

120,000.00 6,000.00 6,000.00

125,000.00 1,250.00 1,250.00

Jumlah 468,050.00 345,800.00 122,250.00

20,000.00 240,000.00 240,000.00

7,500.00 90,000.00 90,000.00

5,000.00 17,500.00 17,500.00

4,500.00 9,000.00 9,000.00

4,500.00 9,000.00 9,000.00

700.00 2,800.00 2,800.00

2,400.00 7,200.00 7,200.00

1,700.00 5,100.00 5,100.00

10,000.00 2,500.00 2,500.00

80,000.00 60,000.00 60,000.00

110,000.00 55,000.00 55,000.00

120,000.00 6,000.00 6,000.00

125,000.00 1,250.00 1,250.00

Jumlah 505,350.00 383,100.00 122,250.00 766,200.00 244,500.00

29,000.00 870,000.00 870,000.00

7,500.00 225,000.00 225,000.00

4,500.00 9,000.00 9,000.00

2,400.00 24,000.00 24,000.00

700.00 21,000.00 21,000.00

Page 207: Analis Cipta Karya 2012-8 FEB 2012

80,000.00 60,000.00 60,000.00

110,000.00 55,000.00 55,000.00

120,000.00 6,000.00 6,000.00

125,000.00 1,250.00 1,250.00

Jumlah 1,271,250.00 1,149,000.00 122,250.00

43,000.00 1,290,000.00 1,290,000.00

7,500.00 225,000.00 225,000.00

4,500.00 9,000.00 9,000.00

2,400.00 24,000.00 24,000.00

700.00 21,000.00 21,000.00

80,000.00 60,000.00 60,000.00

110,000.00 55,000.00 55,000.00

120,000.00 6,000.00 6,000.00

125,000.00 1,250.00 1,250.00

Jumlah 1,691,250.00 1,569,000.00 122,250.00

20,000.00 240,000.00 240,000.00

7,500.00 90,000.00 90,000.00

5,000.00 25,000.00 25,000.00

4,500.00 9,000.00 9,000.00

4,500.00 9,000.00 9,000.00

700.00 8,400.00 8,400.00

2,400.00 7,200.00 7,200.00

1,700.00 5,100.00 5,100.00

10,000.00 2,500.00 2,500.00

80,000.00 60,000.00 60,000.00

110,000.00 55,000.00 55,000.00

120,000.00 6,000.00 6,000.00

125,000.00 1,250.00 1,250.00

Jumlah 518,450.00 393,700.00 124,750.00

3,000.00 105,000.00 105,000.00 7,500.00 262,500.00 262,500.00 5,000.00 25,000.00 25,000.00 4,500.00 4,500.00 4,500.00 4,500.00 13,500.00 13,500.00 700.00 8,400.00 8,400.00 2,400.00 24,000.00 24,000.00 80,000.00 60,000.00 60,000.00 110,000.00 55,000.00 55,000.00 120,000.00 6,000.00 6,000.00 125,000.00 1,250.00 1,250.00

Jumlah 565,150.00 442,900.00 122,250.00

17,000.00 255,000.00 255,000.00

7,500.00 112,500.00 112,500.00

4,500.00 4,500.00 4,500.00

Page 208: Analis Cipta Karya 2012-8 FEB 2012

4,500.00 9,000.00 9,000.00

700.00 4,900.00 4,900.00

2,400.00 12,000.00 12,000.00

1,700.00 3,400.00 3,400.00

10,000.00 2,500.00 2,500.00

80,000.00 60,000.00 60,000.00

110,000.00 55,000.00 55,000.00

120,000.00 6,000.00 6,000.00

125,000.00 1,250.00 1,250.00

Jumlah 526,050.00 403,800.00 122,250.00

3 4

115,000.00 345,000.00 345,000.00

20,000.00 40,000.00 40,000.00

75,000.00 225,000.00 225,000.00

250,000.00 250,000.00 250,000.00

350,000.00 350,000.00 350,000.00

Jumlah 1,210,000.00 860,000.00 350,000.00

3 4

63,125.00 63,125.00 63,125.00

241,250.00 72,375.00 64,800.00 7,575.00 21,041.67 13,550.83 13,550.83

Jumlah 149,050.83 64,800.00 84,250.83

360,000.00 432,000.00 432,000.00

80,000.00 24,000.00 24,000.00

125,000.00 1,250.00 1,250.00

Jumlah 457,250.00 432,000.00 25,250.00

30,000.00 33,000.00 33,000.00

14,400.00 7,200.00 7,200.00

80,000.00 1,600.00 1,600.00

110,000.00 22,000.00 22,000.00

120,000.00 2,400.00 2,400.00

125,000.00 1,250.00 1,250.00

10,000.00 10,000.00 10,000.00

Jumlah 77,450.00 40,200.00 37,250.00

600,000.00 600,000.00 600,000.00

Page 209: Analis Cipta Karya 2012-8 FEB 2012

14,400.00 14,400.00 14,400.00

80,000.00 40,000.00 40,000.00

110,000.00 27,500.00 27,500.00

120,000.00 3,000.00 3,000.00

125,000.00 1,250.00 1,250.00

100,000.00 100,000.00 100,000.00

Jumlah 786,150.00 614,400.00 171,750.00

425,000.00 425,000.00 425,000.00

14,400.00 14,400.00 14,400.00

80,000.00 40,000.00 40,000.00

110,000.00 27,500.00 27,500.00

120,000.00 3,000.00 3,000.00

125,000.00 1,250.00 1,250.00

75,000.00 75,000.00 75,000.00

Jumlah 586,150.00 439,400.00 146,750.00

3 4

600,000.00 600,000.00 600,000.00

14,400.00 14,400.00 14,400.00

80,000.00 40,000.00 40,000.00

110,000.00 27,500.00 27,500.00

120,000.00 3,000.00 3,000.00

125,000.00 1,250.00 1,250.00

75,000.00 75,000.00 75,000.00

Jumlah 761,150.00 614,400.00 146,750.00

791,872.50 839,384.85 1,200.00 3,603.60 235,000.00 5,875.00 1,600.00 19,904.00 7,500.00 4,875.00 80,000.00 104,000.00 110,000.00 71,500.00 120,000.00 7,800.00 125,000.00 8,125.00

Jumlah 1,065,067.45

350,000.00 367,500.00 367,500.00

1,500.00 17,625.00 17,625.00

250,000.00 8,750.00 8,750.00

75,000.00 54,000.00 54,000.00

100,000.00 38,000.00 38,000.00

105,000.00 3,675.00 3,675.00

110,000.00 3,300.00 3,300.00

Page 210: Analis Cipta Karya 2012-8 FEB 2012

Jumlah 492,850.00 393,875.00 98,975.00

375,000.00 393,750.00 393,750.00

1,500.00 17,625.00 17,625.00

250,000.00 8,750.00 8,750.00

75,000.00 54,000.00 54,000.00

100,000.00 38,000.00 38,000.00

105,000.00 3,675.00 3,675.00

110,000.00 3,300.00 3,300.00

Jumlah 519,100.00 420,125.00 98,975.00

700,000.00 770,000.00 770,000.00

45,000.00 20,250.00 20,250.00

20,000.00 70,000.00 70,000.00

7,800.00 62,400.00 48,556.00 6,412.00

750.00 6,000.00 6,000.00

80,000.00 44,800.00 44,800.00

110,000.00 61,600.00 61,600.00

120,000.00 6,720.00 6,720.00

125,000.00 1,037.50 1,037.50

Jumlah 1,042,807.50 914,806.00 120,569.50

325,250.00 29,495,849.18 27,206,010.00 2,289,839.18 241,250.00 449,183.38 402,170.40 47,012.98 1,217,800.00 10,498,483.31 7,216,090.86 3,282,392.44 98,435.00 2,657,745.00 2,040,930.00 616,815.00 132,440.00 6,806,091.60 4,867,403.85 1,938,687.75 862,360.19 4,442,448.49 3,783,571.64 658,876.85 62,021.60 7,129,060.41 2,051,373.87 5,077,686.54 34,650.00 3,982,837.32 597,712.96 3,385,124.36 290,491.05 27,245,155.35 31,193,147.15 9,667,404.25 290,491.05 8,300,781.68 103,075.00 235,860.00 36,189,452.57 36,189,452.57 27,142,089.43 9,047,363.14

Jumlah 137,197,088.28 106,603,575.16 36,247,062.49

350,000.00 367,500.00 367,500.00

1,500.00 17,625.00 17,625.00

250,000.00 8,750.00 8,750.00

80,000.00 57,600.00 57,600.00

110,000.00 41,800.00 41,800.00

120,000.00 4,200.00 4,200.00

125,000.00 3,750.00 3,750.00

Jumlah 501,225.00 393,875.00 107,350.00

325,000.00 341,250.00 341,250.00

1,500.00 17,625.00 17,625.00

Page 211: Analis Cipta Karya 2012-8 FEB 2012

250,000.00 8,750.00 8,750.00

80,000.00 57,600.00 57,600.00

110,000.00 41,800.00 41,800.00

120,000.00 4,200.00 4,200.00

125,000.00 3,750.00 3,750.00

Jumlah 474,975.00 367,625.00 107,350.00

375,000.00 393,750.00 393,750.00

1,500.00 17,625.00 17,625.00

250,000.00 8,750.00 8,750.00

80,000.00 57,600.00 57,600.00

110,000.00 41,800.00 41,800.00

120,000.00 4,200.00 4,200.00

125,000.00 3,750.00 3,750.00

Jumlah 527,475.00 420,125.00 107,350.00

380,000.00 399,000.00 399,000.00

1,500.00 17,625.00 17,625.00

250,000.00 8,750.00 8,750.00

80,000.00 57,600.00 57,600.00

110,000.00 41,800.00 41,800.00

120,000.00 4,200.00 4,200.00

125,000.00 3,750.00 3,750.00

Jumlah 532,725.00 425,375.00 107,350.00

180,000.00 189,000.00 189,000.00

1,500.00 17,625.00 17,625.00

250,000.00 8,750.00 8,750.00

80,000.00 40,000.00 40,000.00

110,000.00 41,800.00 41,800.00

120,000.00 4,200.00 4,200.00

125,000.00 3,750.00 3,750.00

Jumlah 305,125.00 215,375.00 89,750.00

28,800.00 86,400.00 86,400.00

80,000.00 9,600.00 9,600.00

110,000.00 13,200.00 13,200.00

120,000.00 1,440.00 1,440.00

125,000.00 750.00 750.00

Jumlah 111,390.00 86,400.00 24,990.00

1,217,800.00 49,320.90 33,900.53 15,420.38

62,021.60 45,895.98 13,206.48 32,689.50 34,650.00 25,641.00 3,848.00 21,793

Jumlah 120,857.88 50,955.01 69,902.88

Page 212: Analis Cipta Karya 2012-8 FEB 2012

1,217,800.00 328,806.00 226,003.50 102,802.50

62,021.60 136,447.52 39,262.52 97,185.00 34,650.00 76,230.00 11,440.00 64,790

Jumlah 541,483.52 276,706.02 264,777.50 Untuk 1m3= 5,414,835.20 2,767,060.20 2,647,775.00

1,217,800.00 207,026.00 142,298.50 64,727.50

62,021.60 136,447.52 39,262.52 97,185.00 34,650.00 76,230.00 11,440.00 64,790

Jumlah 419,703.52 193,001.02 226,702.50 Untuk 1m3= 4,197,035.20 1,930,010.20 2,267,025.00

1,600.00 20,000.00 20,000.00

1,000.00 25,000.00 25,000.00

235,000.00 3,008.00 3,008.00

80,000.00 60,000.00 60,000.00

110,000.00 110,000.00 110,000.00

120,000.00 60,000.00 60,000.00

125,000.00 12,500.00 12,500.00

Jumlah 290,508.00 48,008.00 242,500.00

435,762.00 72,012.00 363,750.00 581,016.00 96,016.00 485,000.00 871,524.00 144,024.00 727,500.00

132,525.00 240,314.21 171,270.91 69,043.3013

99,883.40 103,499.18 23,880.89 76,290.2250 1,000.00 20,000.00 20,000.00

435,762.00 752,560.97 124,364.72 628,196.25

581,016.00 1,003,414.63 165,819.63 837,595.00

581,016.00 1,185,853.66 195,968.66 989,885.00

871,524.00 1,778,780.48 293,952.98 1,484,827.50

Jumlah 5,084,423.13 995,257.79 4,085,837.28

460,000.00 690,000.00 690,000.00

36,666.67 80,666.67 80,666.67

45,000.00 45,000.00 45,000.00

4,071.50 65,144.00 52,320.00 12,824.00

24,750.00 2,722.50 2,722.50

7,500.00 30,000.00 30,000.00

35,575.00 12,522.40 2,930.40 9,592.00

80,000.00 60,000.00 60,000.00

110,000.00 110,000.00 110,000.00

120,000.00 60,000.00 60,000.00

Page 213: Analis Cipta Karya 2012-8 FEB 2012

125,000.00 9,375.00 9,375.00

1,165,430.57 903,639.57 261,791.00

1,519,029.44 78,685.73 69,569.70 9,116.02 99,883.40 74,912.55 17,284.95 55,218.7500 11,354.84 34,064.52 34,064.52

12,522.40 563.51 563.51

182,817.50 137,113.13 100,668.75 36,444.38

10,000.00 20,410.00 20,410.00

345,749.42 242,561.43 100,779.15

420,000.00 420,000.00 420,000.00

42,000.00 20,160.00 20,160.00

1,000.00 8,000.00 8,000.00

50,000.00 50,000.00 50,000.00

100,000.00 100,000.00 100,000.00

598,160.00 498,160.00 100,000.00

5,530,000 5,530,000.00 5,530,000.00

56,000 840,000.00 840,000.00

7,500 112,500.00 112,500.00

4,500 22,500.00 22,500.00

4,500 45,000.00 45,000.00

12,500 3,125.00 3,125.00

700 21,000.00 21,000.00

2,750,000 1,375,000.00 1,375,000.00

495,000 495,000.00 495,000.00

Jumlah 8,444,125.00 7,949,125.00 495,000.00

8,295,000 8,295,000.00 8,295,000.00

70,000 1,050,000.00 1,050,000.00

7,500 112,500.00 112,500.00

4,500 9,000.00 9,000.00

4,500 45,000.00 45,000.00

12,500 6,250.00 6,250.00

700 21,000.00 21,000.00

2,750,000 2,062,500.00 2,062,500.00

742,500 742,500.00 742,500.00

Jumlah 12,343,750.00 11,601,250.00 742,500.00

11,060,000 11,060,000.00 11,060,000.00

84,000 1,260,000.00 1,260,000.00

7,500 112,500.00 112,500.00

4,500 22,500.00 22,500.00

4,500 45,000.00 45,000.00

12,500 6,250.00 6,250.00

700 21,000.00 21,000.00

2,750,000 2,750,000.00 2,750,000.00

Page 214: Analis Cipta Karya 2012-8 FEB 2012

990,000 990,000.00 990,000.00

Jumlah 16,267,250.00 15,277,250.00 990,000.00

27,650,000 27,650,000.00 27,650,000.00

112,000 1,680,000.00 1,680,000.00

7,500 112,500.00 112,500.00

4,500 22,500.00 22,500.00

4,500 45,000.00 45,000.00

12,500 6,250.00 6,250.00

700 21,000.00 21,000.00

2,750,000 2,750,000.00 2,750,000.00

2,475,000 2,475,000.00 2,475,000.00

Jumlah 34,762,250.00 32,287,250.00 2,475,000.00

41,475,000 41,475,000.00 41,475,000.00

112,000 1,680,000.00 1,680,000.00

7,500 112,500.00 112,500.00

4,500 22,500.00 22,500.00

4,500 45,000.00 45,000.00

12,500 6,250.00 6,250.00

700 21,000.00 21,000.00

2,750,000 2,750,000.00 2,750,000.00

3,712,500 3,712,500.00 3,712,500.00

Jumlah 49,824,750.00 46,112,250.00 3,712,500.00

Page 215: Analis Cipta Karya 2012-8 FEB 2012

5.00

ctrl

Page 216: Analis Cipta Karya 2012-8 FEB 2012

121,780.00

Page 217: Analis Cipta Karya 2012-8 FEB 2012

397,061.66

Page 218: Analis Cipta Karya 2012-8 FEB 2012

22,764.00

Page 219: Analis Cipta Karya 2012-8 FEB 2012

365,635.00

372,175.00

525,635.00

Page 220: Analis Cipta Karya 2012-8 FEB 2012

394,735.00

98,435.00

132,440.00

Page 221: Analis Cipta Karya 2012-8 FEB 2012

-

Page 222: Analis Cipta Karya 2012-8 FEB 2012

4,772,681.31

8,040,606.95

6,774,822.49

5,556,873.85

Page 223: Analis Cipta Karya 2012-8 FEB 2012

7,693,364.52

9,407,485.51

7,567,885.35

10,669,110.81

7,567,885.35

7,567,885.35

10,183,367.50

7,567,885.35

Page 224: Analis Cipta Karya 2012-8 FEB 2012

10,063,119.32

9,407,485.51

12,216,943.97

8,063,907.51

1,519,029.44

5,059,209.81

1,519,029.44

4,859,162.85

1,519,029.44

Page 225: Analis Cipta Karya 2012-8 FEB 2012

10,596,294.15

1,519,029.44

16,034,881.99

1,519,029.44

7,693,364.52

1,519,029.44

10,226,739.19

5,793,545.88

6,685,176.49

5,728,663.85

Page 226: Analis Cipta Karya 2012-8 FEB 2012

1,090,750.00

7,565,639.07

Page 227: Analis Cipta Karya 2012-8 FEB 2012

9,480,302.18

10,135,935.99

243,353.30

7,077,177.61

65,233.40

2.0000

Page 228: Analis Cipta Karya 2012-8 FEB 2012

1.0000

0.1000

0.1000

62,021.60

34,650.00

59,799.00

137,275.00

Page 229: Analis Cipta Karya 2012-8 FEB 2012

#REF!

101,584.00

267,705.00

267,705.00

3.056

2.778

537,977.85

331,783.23

537,977.85

Page 230: Analis Cipta Karya 2012-8 FEB 2012

225,682.60

2,398,682.60

6.25 0.63 6.88

251,614.00

235,860.00

235,190.00

235,190.00

Page 231: Analis Cipta Karya 2012-8 FEB 2012

1,337,260.00

1,337,260.00

303,512.50

257,540.00

108,500.00

32,550.00

Page 232: Analis Cipta Karya 2012-8 FEB 2012

14,713.50

99,725.00

24,845.00

Page 233: Analis Cipta Karya 2012-8 FEB 2012

31,698.50

Cat Dasar Luar 797,000.00

Cat Dasar dalam 740,000.00

cat Finising Luar 1,473,500.00

Cat Finising Dalam 998,000.00

1,840.00

7,969.50

869.40

359.38

11,038.28 1,439.77

53,947.00

0.03247

35,575.00

185,653.00

Page 234: Analis Cipta Karya 2012-8 FEB 2012

165,845.00

162,050.00

0.375 Lbr Teackwood 4 mm

0.03 Kg Paku Tripleks

0.07 H.o Pekerja

0.1 H.o Tukang Kayu

0.01 H.o Kepala Tukang

0.0035 H.o Mandor

71,599.39

0.2 H.o Pekerja

0.6 H.o Tukang Kayu

0.06 H.o Kepala Tukang

0.01 H.o Mandor

94,634.00

Rp. -

Rp. -

90,876.25

Page 235: Analis Cipta Karya 2012-8 FEB 2012

Rp. -

Rp. #REF!

42,898.25

72,697.50

#VALUE!

0.2700 0.4050

0.7000 1.0500

0.02 0.0700 0.1050

14,959,642,784.54 (72,697.50)

(385,855,246.22) 17,500.00

15,345,498,030.76

36,010.58 44,012.92

202,075.50

Page 236: Analis Cipta Karya 2012-8 FEB 2012

m2

2.64

0.66

80,023.50

0.73

52,797.00

61,329.00

105,855.00

0.2800

Page 237: Analis Cipta Karya 2012-8 FEB 2012

0.8000 0.0800 0.0140

237,235.00

164,362.50

88,477.00

34,685.00

Page 238: Analis Cipta Karya 2012-8 FEB 2012

28,685.00

22,685.00

31,775.00

31,685.00

29,060.00

Page 239: Analis Cipta Karya 2012-8 FEB 2012

21,185.00

6,807,000.00

457,800.00

691,893.75

234,093.75

Page 240: Analis Cipta Karya 2012-8 FEB 2012

620,300.00

612,250.00

696,250.00

1,135,781.60

1,061,381.25

Page 241: Analis Cipta Karya 2012-8 FEB 2012

261,748.50

602,948.50

8,045,637.60

25,402,048.73 -

7,747,755.60 -

740,000.00 -

3,904,200.00 -

2,122,762.50 -

5,500,000.00 -

2,500,000.00 -

500,000.00 -

48,416,766.83 -

98,047,970.16

Page 242: Analis Cipta Karya 2012-8 FEB 2012

616,930.00

568,700.00

146,940.00

1,721,975.01

Page 243: Analis Cipta Karya 2012-8 FEB 2012

563,263.50

2,623,291.00

5,801,600.00

7,347,675.00

Page 244: Analis Cipta Karya 2012-8 FEB 2012

5,023,400.00

3,846,400.00

34,850.00

63,200.00

273,947.50

547,895.00

Page 245: Analis Cipta Karya 2012-8 FEB 2012

erawe

aewraew

146,761.64

50607.461355529 51617.6452499078

Page 246: Analis Cipta Karya 2012-8 FEB 2012

199,550.00

36,070.00

35,495.00

35,245.00

352.45

36,422.45

12,186,862.50

Page 247: Analis Cipta Karya 2012-8 FEB 2012

72,575.00

237,450.00

40,715.00

4,071.50

264,729.50

Page 248: Analis Cipta Karya 2012-8 FEB 2012

3,469,894.13

843,314.25

2,730,562.95

15,114,078.50

Page 249: Analis Cipta Karya 2012-8 FEB 2012

311,967.47

2,704,952.43

1,256,185.62

176,890.00

287,735.00

Page 250: Analis Cipta Karya 2012-8 FEB 2012

298,913.54

1,996,846.49

16,302,654.62

92,025.00

256,400.00

Page 251: Analis Cipta Karya 2012-8 FEB 2012

12,271,455.65 122,717 257.15 2.57

13,698,510.31

2,326,162.13

1,395,697.28

23,778,546.19

5,169,249.17

1,860,929.70

2,282,394.88

7,526,080.00 32.3

63,309,575.01 66,019,061.40

10,031,455.65

4,641,500.00

Page 252: Analis Cipta Karya 2012-8 FEB 2012

2,821,750.00

5,643,500.00

127,675.00

464,975.00

69,825.00

Page 253: Analis Cipta Karya 2012-8 FEB 2012

89,975.00

93,075.00

128,925.00

159,925.00

209,525.00

287,025.00

Page 254: Analis Cipta Karya 2012-8 FEB 2012

333,600.00

232,712.50

73,062.50

52,137.50

45,862.50

39,760.00

27,475.00

Page 255: Analis Cipta Karya 2012-8 FEB 2012

0.09 11,050.71

0.06 11,972.86

0.12 11,080.36

0.17 14,995.83

0.57 39,900.00

0.06 628.57

0.07 607.14

0.43 2,142.86

0.01 142.86

0.02 309.52

0.03 433.33

0.05 380.95

0.17 833.33

0.03 400.00

0.05 333.33

0.10 476.19

0.02 285.71

0.03 250.00

0.24 952.38

0.01 171.43

0.02 238.10

0.01 166.67

0.02 857.14

0.02 609.52

0.02 476.19

0.12 1,428.57

0.01 3,333.33

0.00 2,142.86 106,599.76

Page 256: Analis Cipta Karya 2012-8 FEB 2012

39,735,125.00

19,841,325.00

Page 257: Analis Cipta Karya 2012-8 FEB 2012

17,592,320.00

Page 258: Analis Cipta Karya 2012-8 FEB 2012

52,946,800.00

7,092,480.00

323,375.00

257,625.00

Page 259: Analis Cipta Karya 2012-8 FEB 2012

204,031.25

47,593.75

79,593.75

34,593.75

61,393.75

53,062.50

Page 260: Analis Cipta Karya 2012-8 FEB 2012

29,393.75

188,425.00

294,593.75

605,312.50

95,062.50

2,869,620.00

Page 261: Analis Cipta Karya 2012-8 FEB 2012

378,500.00

6,369,500.00

2,873,950.00

3,293,950.00

3,892,500.00

4,385,196.00

Page 262: Analis Cipta Karya 2012-8 FEB 2012

5,375,254.00 5,425,000.00 (49,746.00)

539,160.00

3,346,450.00

8,734,550.00

6,084,550.00

0.049

0.018

0.031

Page 263: Analis Cipta Karya 2012-8 FEB 2012

0.035

MEMASANG 1 BUAH TUTUP MEN HOLE

0.6240 M³

0.0480 M³

0.1000 M³

1.6800 M2

1.6800 M³

0.2500 H.o

1.0000 Ls

468,050.00

505,350.00

1,010,700.00

Page 264: Analis Cipta Karya 2012-8 FEB 2012

1,271,250.00

1,691,250.00

518,450.00

565,150.00

Page 265: Analis Cipta Karya 2012-8 FEB 2012

526,050.00

1,210,000.00

149,050.83

457,250.00

77,450.00

Page 266: Analis Cipta Karya 2012-8 FEB 2012

786,150.00

586,150.00

761,150.00

Page 267: Analis Cipta Karya 2012-8 FEB 2012

492,850.00

519,100.00

54,968.00

1,035,375.50

142,850,637.65

Page 268: Analis Cipta Karya 2012-8 FEB 2012

474,975.00

527,475.00

305,125.00

111,390.00

Page 269: Analis Cipta Karya 2012-8 FEB 2012

541,483.52

419,703.52

4,197,035.20

290,508.00

435,762.00

581,016.00

871,524.00

240,314.21

100,171.11

20,000.00

752,560.97

1,003,414.63

1,185,853.66

1,778,780.48

5,081,095.07

Page 270: Analis Cipta Karya 2012-8 FEB 2012

1,165,430.57 - 239,375.00

5,625.00

1,171,055.57

78,685.73

72,503.70

34,064.52

563.51

137,113.13

20,410.00

343,340.57

8,444,125.00

12,343,750.00

Page 271: Analis Cipta Karya 2012-8 FEB 2012

16,267,250.00

34,762,250.00

49,824,750.00

Page 272: Analis Cipta Karya 2012-8 FEB 2012

1,036,100.00 51,805.00

962,000.00 48,100.00

1,915,550.00 95,777.50

1,297,400.00 64,870.00

Page 273: Analis Cipta Karya 2012-8 FEB 2012

Teackwood 4 mm

Paku Tripleks

Tukang Kayu

Kepala Tukang

Tukang Kayu

Kepala Tukang

Rp. -

Rp. -

Rp. -

Page 274: Analis Cipta Karya 2012-8 FEB 2012

Rp. -

Rp. ###

Rp. ###

64,225.00 30,240.00

40,320.00 118,800.00

440.00 12,960.00

Page 275: Analis Cipta Karya 2012-8 FEB 2012
Page 276: Analis Cipta Karya 2012-8 FEB 2012

MEMASANG 1 BUAH TUTUP MEN HOLE

Galian Tanah

Urugan Pasir

Urugan Kerikil

Pasang Bekisting

Beton 1 : 2 : 3

Plesteran+Acian

Penutup Plat Besi + Rangka

Page 277: Analis Cipta Karya 2012-8 FEB 2012

BASIS HARGA KABUPAJEN MIMIKAHARGA SATUAN BAHAN BANGUNAN

TAHUN ANGGARAN 2012

NO URAIAN T.A 2010 TA. 2011

1 2 3 4 51 Semen PC Zak 75,000.00 73,908.00 2 Semen Putih Zak 127,500.00 142,537.00 3 Batu Kali M3 600,000.00 600,000.00 4 Batu Tela M3 1,700.00 1,800.00 5 Kerikil Kali M3 450,000.00 450,000.00 6 Kerikil (batu pecah)_ M3 650,000.00 650,000.00 7 Pasir Pasang M3 250,000.00 250,000.00 8 Batu Peca'h Bahan Landasan M3 650,000.00 650,000.00 9 Aspal 1,200,000.00 1,200,000.00

10 Sirtu M3 250,000.00 250,000.00 11 Sirtu Timbunan M3 220,000.00 220,000.00 12 M3 180,000.00 180,000.00 13 Kawat Ikat Kg 22,000.00 22,000.00 14 - Besi 0 6 Btg 26,396.00 15 Btg 75,000.00 85,000.00 16 - Besi 0 10 Btg 68,629.00 17 - Besi 0 12 Btg 89,746.00 18 Kayu Kelas I (balok) M3 3,300,000.00 3,300,000.00 19 Kayu Kelas I (papan) M3 2,700,000.00 3,700,000.00 20 Kayu Kelas II (balok) M3 1,750,000.00 2,000,000.00 21 Kayu Kelas I! (papan) M3 1,000,000.00 1,900,000.00 22 Split 1-2 m3 1,000,000.00 23 Split 2-3 m3 1,000,000.00 24 Split 3-5 m3 850,000.00 25 Tripleks 3 mm Lbr 60,500.00 50,000.00 26 Tripleks 4 mm Lbr 70,000.00 80,000.00 27 Lbr 75,000.00 90,000.00 28 Tripleks 6 mm Lbr 85,000.00 110,000.00 29 Tripleks 9 mm Lbr 110,000.00 147,816.00 30 Tripleks 12 mm Lbr 125,000.00 190,049.00 31 Tripleks 16 mm Lbr 150,000.00 263,958.00 32 Tripleks 18 mm Lbr33 Taekwood UK. 122 X 244 cm Lbr 160,000.00 174,212.00 34 Atap Seng BJLS 30 Lbr 62,000.00 73,908.00 35 Atap Seng BJLS 20 Lbr 52,000.00 39,066.00 36 Seng_Plat BJLS 0,02X90X100 CM Lbr 40,000.00 263,958.00 37 Seng_Plat BJLS 0,02X90X180 CM Lbr 47,500.00 47,500.00 38 Seng Plat BJLS 30 - - 39 Seng Plat BJLS 20 - - 40 Ardes Gelombang Besar Lbr 49,000.00 50,000.00 41 Ardes Gelombang Kecil Lbr 37,500.00 42,000.00

SA

TU

AN

Drum

Tanah Timbunan .

- Besi Beton (UK 8mm X 12)

Tripleks 5 mm

Page 278: Analis Cipta Karya 2012-8 FEB 2012

42 SengjAlmunium Kecil 55 cm Lbr 32,500.00 35,000.00 43 Seng Almunium Kecil 60 cm Lbr 37,500.00 37,500.00 44 Kaca Bening 3 mm M2 34,500.00 34,500.00 45 Kaca Bening 5 mm M2 110,000.00 184,770.00 46 Kaca Buram 5 mm M2 142,500.00 142,500.00 47 Kaca Riben 5 mm M2 155,000.00 227,003.00 48 Kaca Lover 7 Klip Set 210,000.00 210,000.00 49 Kaca Lover 8 Klip Set 215,000.00 215,000.00 50 Kaca Nako Lbr 17,500.00 17,500.00 51 Kunci 1 Slag Bh 55,000.00 55,000.00 52 Kunci 2 Slag Bh 78,000.00 211,166.00 53 Kunci Yale Besar Bh 127,500.00 158,375.00 54 Kunci Kuda Terbang 1 Slag Bh - 63,350.00 55 Kunci Kuda Terbang 2 Slag Bh - 73,908.00 56 Engsel H Jendeia Psg 8,250.00 26,396.00 57 Engsel H Pintu Psg 11,000.00 36,954.00 58 Engsel Kupu Ring Nylon Jendeia Psg 5,000.00 7,245.00 59 Engsel kudu Ring Nylon Pintu PsG 12,500.00 21,117.00 60 HakAngin Biasa Bh 8,500.00 8,000.00 61 Hak Angin Lipat Bh 11,500.00 11,500.00 62 Kunci Gembok Bh 18,000.00 36,954.00 63 Grendel Kecil Bh 11,000.00 11,000.00 64 Grendel Sedang Bh 12,000.00 15,837.00 65 Grendel Besar Bh 22,500.00 26,396.00 66 Kloset Duduk Keramik KIA Bh 1,300,000.00 1,900,494.00 67 Kloset Duduk Keramik TOTO BH 1,700,000.00 1,700,000.00 68 Kloset Duduk Keramik Biasa Bh 455,000.00 1,478,162.00 69 Kloset Duduk Keramik INA BH 1,450,000.00 1,450,000.00 70 Kloset Jongkok Porselen Putih Bh 125,000.00 104,750.00 71 Kloset Jongkok Keramik Bh 150,000.00 126,700.00 72 Klosed Jongkok merk TOTO Bh - 263,958.00 73 Klosed Jongkok merk KIA Bh - 211,166.00 74 Wastafel Toto Bh 750,000.00 1,003,039.00 75 Wastafel INA Bh 450,000.00 450,000.00 76 Pompa Air Sanyo Bh 500,000.00 1,055,830.00 77 Pompa Air Sanyo PH 100 BH 600,000.00 900,000.00 78 Pompa Air Nasional PH 100 Bh 800,000.00 800,000.00 79 Pompa Air PANASONIC BH 800,000.00 800,000.00 80 Pompa Air Honda (Alkon) Bh 3,695,405.00 81 Kran Ledeng Bh 35,000.00 26,396.00 82 Paku Campuran Kg 18,000.00 20,000.00 83 Paku Tripleks Kg 18,000.00 21,117.00 84 Paku Ardeks Kg 18,000.00 18,000.00 85 Paku Seng Kg 18,000.00 26,396.00 86 Paku Asbes Kg 18,000.00 18,000.00 87 Paku Jembatan Kg 50,000.00 31,675.00 88 Mur Baut 5 - 20 cm Btg 15,000.00 15,000.00 89 Besi Siku 20 X 20 2 mtr Btg 50,000.00 50,000.00 90 Besi Siku 20 X 20 & mtr Btg - 73,908.00 91 Besi Siku 30 X 30 3 mtr Btg 95,000.00 95,000.00 92 Besi Siku 30 X 30 6 mtr Btg 100,000.00 100,000.00 93 Besi Siku 40 X 40 3 mtr Btg 100,000.00 100,000.00

Page 279: Analis Cipta Karya 2012-8 FEB 2012

94 Besi Siku 40 X 40 6 mtr Btg 140,000.00 140,000.00 95 Besi Siku 50 X 50 4 mtr Btg 175,000.00 175,000.00 96 Besi Siku 50 X 50 5 - 6 mtr Btg 315,000.00 315,000.00 97 Besi Siku 60 X 60 6 mtr Btg^ 450,000.00 450,000.00 98 Besi Siku 100X100.10 6 mtr Btg 475,000.00 475,000.00 99 Btg^ 16,000.00 19,005.00

100 Btg 21,000.00 24,284.00 101 Pipa PVC diameter 1" - 4 mtr Btg 27,000.00 31,675.00 102 Pipa PVC diameter 2" - 4 mtr Btg 50,000.00 52,792.00 103 Pipa PVC diameter 3" - 4 mtr Btg 75,000.00 89,746.00 104 Pipa PVC diameter 4" - 4 mtr Btg 100,000.00 121,420.00 105 Pipa PVC diameter 5" - 4 mtr Btg 115,000.00 263,958.00 106 Pipa PVC diameter 6" - 4 mtr Btg 135,000.00 290,353.00 107 Kopling PVC 2" - 4 mtr Bh 10,000.00 21,117.00 108 Kopling PVC 4" - 6 mtr Bh 20,000.00 89,746.00 109 Pipa GIV diameter 1/2" - 4 mtr Btg 150,000.00 150,000.00 110 Pipa GIV diameter 3/4" - 4 mtr Btg 200,000.00 200,000.00 111 Pipa GIV diameter 1" - 4 mtr BJa 275,000.00 275,000.00 112 Pipa GIV diameter 2" - 4 mtr Btg 500,000.00 500,000.00 113 Pipa GIV diameter 3" - 4 mtr Btg 950,000.00 950,000.00 114 Pipa GIV diameter 4" - 4 mtr Btg 1,050,000.00 1,050,000.00 115 Pipa GIV diameter 5" - 4 mtr Btg 1,100,000.00 1,100,000.00 116 Pipa GIV diameter 6" - 4 mtr Btg 1,200,000.00 1,200,000.00 117 Pipa GIV diameter 1/2" - 6 mtr Btg 135,000.00 174,212.00 118 Pipa GIV diameter 3/4" - 6 mtr Btg 150,000.00 205,887.00 119 Pipa GIV diameter 1" - 6 mtr Btg 190,000.00 263,958.00 120 Pipa GIV diameter 1 ,5" - 6 mtr Btg - 422,332.00 121 Pipa GIV diameter 2" - 6 mtr Btg 340,000.00 527,915.00 122 Pipa GIV diameter 3" - 6 mtr Btg 700,000.00 1,055,830.00 123 Pipa GIV diameter 4" - 6 mtr Btg 1,050,000.00 1,050,000.00 124 Pipa GIV diameter 5" - 6 mtr Btg 1,100,000.00 1,100,000.00 125 Dlna CSIV riiam«ter 6" - 6 mtr Btg 1,200,000.00 1,200,000.00 126127 Cat Tembok ( 5 KgJ Kg 35,000.00 322,028.00 128 Cat Tembok Fernis / Politur Kg 35,000.00 51,736.00 129 Cat Teak Oil Kg 30,000.00 30,000.00 130 Cat Kilat Kayu / Cat Besi Kg 40,000.00 41,177.00 131 Cat Dasar/ Gate Meni Kg 27,500.00 27,500.00 132 Cat Residu Kg 35,000.00 35,000.00 133 Cat Alumunium Kg 35,000.00 52,792.00 134 Plamir Tembok 10,000.00 35,000.00 135 Dempul Kg 20,000.00 21,117.00 136 Cat Meni Kg 27,500.00 26,396.00 137 Melamine IMPRA Ltr - 52,792.00 138 Cat Tembok Kg

- Merk Avitex pail - 322,028.00 - Merk Aries pail - 121,420.00 - Merk Altex pail - 311,470.00

139 Vlerk Lainnya:- Beauty Color pail - - - Metrolite pail - - - Jatilux pail - -

Pipa PVC diameter 1/2" - 4 mtrPipa PVC diameter 3/4" - 4 mtr

Pipa Leding diameter 1/2" - 6 mtr

K9

Page 280: Analis Cipta Karya 2012-8 FEB 2012

140 Amplas Kg 5,000.00 5,000.00 141 Tinner Kg 22,000.00 26,396.00 142 Lem Kayu Kg 35,000.00 35,000.00 143 Lem Aibon Kg 35,000.00 47,512.00 144 Kuas Roll Bh 15,000.00 21,117.00 145 Kuas Biasa Bh 10,000.00 15,837.00 146 Bahan Bakar Minyak Tanah Ltr 8,000.00 10,000.00 147 Bahan Bakar Solar Ltr 4,500.00 4,500.00 148 Bahan Bakar Pelumas Ltr 30,000.00 30,000.00 149 Bahan Bakar Premium Ltr 4,500.00 4,500.00 150 Lampu TL 20 Watt ; Bh 30,000.00 89,746.00 151 Lampu TL 2 X 20 Watt Bh 27,000.00 27,000.00 152 Lampu TL 40 Watt Bh 25,000.00 116,141.00 153 Lampu TL 2 X 40 Watt Bh 125,000.00 125,000.00 154 Bh 22,000.00 22,000.00 155 Viting Bh 15,000.00 15,837.00 156 Saklar Doble Bh 20,000.00 21,117.00 157 Saklar Tunggal Bh 22,000.00 21,117.00 158 Stop Kontak Bh 20,000.00 21,117.00 159 Stop Kontak 1.000 Watt Bh - 26,396.00 160 MCB (Miniatur Circuit Breaker) Bh - 68,629.00 161 Sekring 1 Grup Bh 35,000.00 35,000.00 162 Sekring 2 Grup Bh 50,000.00 50,000.00 163 Sekring 3 Grup Bh 110,000.00 110,000.00 164 Sekring Otomatis Bh 45,000.00 52,792.00 165 Box Sekring Bh 25,000.00 79,187.00 166 Box MCB Grup - 167 Kabel NYA 2,5 X 2 mm Mtr 11,000.00 9,000.00 168 Tegel Keramik 30 X 30 Lbr 42,000.00 63,350.00 169 TegelKeramik 10X20 Lbr 45,000.00 52,792.00 170 Tegel Mozaik 30 X 30 Lbr 60,000.00 60,000.00 171 Tegel Porselin 11X11 Lbr_ 45,000.00 45,000.00 172 Tegel Teraso 30 X 30 Lbr 50,000.00 58,071.00 173 Tegel PC Abu - Abu 20 X 20 M3 45,000.00 52,792.00 174 Paving Block Bh175 Gypsum Lbr - 89,746.00 176 Genteng Metal Lbr - 100,304.00 177 Bubungan Genteng Metal Bh - 47,512.00 178 Polycarbonate M2 - - 179 Lumbersharing Lbr - 26,396.00 180 Tandon 1100Ltr bh - - 181 Batu Alam Palimanan Bh - 15,837.00 182 Lis Plafon M' - 5,279.00 183 Pasir Beton M3 250,000.00

184 MANDOR O/H

185 KERALA TUKANG O/H

186 TUKANG O/H

187 PEKERJA O/H

Lampu Pijar 10-100 Watt + Viting

Page 281: Analis Cipta Karya 2012-8 FEB 2012

TA. 2012

6 80,000.00 130,000.00 600,000.00 2,000.00 450,000.00 650,000.00 395,000.00 650,000.00 1,200,000.00 250,000.00 180,000.00 220,000.00 35,000.00 25,000.00 45,000.00 66,000.00 93,000.00 3,400,000.00 3,750,000.00 2,100,000.00 2,000,000.00 1,000,000.00 1,000,000.00 850,000.00 58,000.00 70,000.00 85,000.00 95,000.00 135,000.00 180,000.00 263,958.00 250,000.00 100,000.00 55,000.00 40,000.00 263,958.00 47,500.00 55,000.00 40,000.00 50,000.00 42,000.00

Page 282: Analis Cipta Karya 2012-8 FEB 2012

35,000.00 37,500.00 100,000.00 150,000.00 142,500.00 170,000.00 200,000.00 200,000.00 15,000.00 150,000.00 150,000.00 150,000.00 60,000.00 75,000.00 18,000.00 24,000.00 20,000.00 15,000.00 8,000.00 11,500.00 50,000.00 10,000.00 15,000.00 22,000.00 1,250,000.00 1,700,000.00 500,000.00 1,450,000.00 104,750.00 160,000.00 300,000.00 250,000.00 900,000.00 450,000.00 1,055,830.00 1,100,000.00 800,000.00 800,000.00 3,500,000.00 35,000.00 18,000.00 25,000.00 18,000.00 25,000.00 18,000.00 30,000.00 15,000.00 50,000.00 75,000.00 95,000.00 100,000.00 100,000.00

Page 283: Analis Cipta Karya 2012-8 FEB 2012

150,000.00 175,000.00 225,000.00 450,000.00 475,000.00 22,000.00 27,000.00 31,000.00 50,000.00 80,000.00 115,000.00 263,958.00 290,353.00 15,000.00 20,000.00 150,000.00 200,000.00 275,000.00 500,000.00 950,000.00 1,050,000.00 1,100,000.00 1,200,000.00 145,000.00 175,000.00 235,000.00 400,000.00 525,000.00 1,000,000.00 1,050,000.00 1,100,000.00 1,200,000.00 12,000.00 322,028.00 50,000.00 30,000.00 42,000.00 20,000.00 25,000.00 55,000.00 50,000.00 20,000.00 20,000.00 50,000.00

380,000.00 125,000.00 350,000.00

125,000.00 380,000.00 285,000.00

Page 284: Analis Cipta Karya 2012-8 FEB 2012

5,000.00 25,000.00 15,000.00 35,000.00 55,000.00 15,000.00 10,000.00 4,500.00 30,000.00 4,500.00 39,000.00 27,000.00 45,000.00 125,000.00 10,000.00 35,000.00 20,000.00 20,000.00 21,117.00 26,396.00 50,000.00 35,000.00 50,000.00 110,000.00 60,000.00 79,187.00 50,000.00 10,000.00 58,000.00 50,000.00 60,000.00 45,000.00 60,000.00 60,000.00

90,000.00 35,000.00 45,000.00 300,000.00 25,000.00 2,200,000.00 15,000.00 25,000.00 250,000.00

150,000.00

125,000.00

110,000.00

100,000.00