DAFTAR HARGA SATUAN UPAH KERJA TAHUN ANGGARAN 2012 NO. URAIAN TENAGA KERJA SATUAN HARGA SATUAN (Rp.) 1 2 3 4 1 M a n d o r HOK 53,000.00 2 Kep. Tukang Gali Tanah HOK 46,000.00 3 Kep. Tukang Batu HOK 51,000.00 4 Kep. Tukang Kayu HOK 51,000.00 5 Kep. Tukang Besi HOK 51,000.00 6 Kep. Tukang Cat HOK 50,000.00 7 Kep. Tukang Listrik HOK 55,125.00 8 Tukang Gali Tanah HOK 36,900.00 9 Tukang Batu HOK 46,000.00 10 Tukang Kayu HOK 49,000.00 11 Tukang Besi HOK 47,000.00 12 Tukang Cat HOK 42,400.00 13 Tukang Listrik HOK 48,000.00 14 Tukang Aspal HOK 44,400.00 15 Tukang Politur HOK 43,600.00 16 P e k e r j a HOK 35,000.00 ` 17 Buruh Terampil HOK 38,000.00 18 Buruh Tak Terampil HOK 34,000.00 19 Operator Terampil HOK 54,100.00 20 Pembantu Operator HOK 39,500.00 21 Sopir Terampil HOK 57,100.00 22 Pembantu Sopir HOK 36,500.00 23 Masinis HOK 50,166.67 24 K e r n e t HOK 35,625.00 25 P e n j a g a HOK 33,750.00 26 Penjaga Api HOK 37,500.00 27 Penganyam HOK 40,000.00 Tuban, Januari 201 KEPALA BIDANG TATA RUANG DAN PEMU Ir. S A T R I Y O NIP. 19590405 199003 1 005

description

Analisa Harga Satuan

Transcript of Analis 2012 Gedung

Page 1: Analis 2012 Gedung

DAFTAR HARGA SATUAN UPAH KERJA TAHUN ANGGARAN 2012

NO. URAIAN TENAGA KERJA SATUAN HARGA SATUAN

KETERANGAN (Rp.)

1 2 3 4 5

1 M a n d o r HOK 53,000.00

2 Kep. Tukang Gali Tanah HOK 46,000.00

3 Kep. Tukang Batu HOK 51,000.00

4 Kep. Tukang Kayu HOK 51,000.00

5 Kep. Tukang Besi HOK 51,000.00

6 Kep. Tukang Cat HOK 50,000.00

7 Kep. Tukang Listrik HOK 55,125.00

8 Tukang Gali Tanah HOK 36,900.00

9 Tukang Batu HOK 46,000.00

10 Tukang Kayu HOK 49,000.00

11 Tukang Besi HOK 47,000.00

12 Tukang Cat HOK 42,400.00

13 Tukang Listrik HOK 48,000.00

14 Tukang Aspal HOK 44,400.00

15 Tukang Politur HOK 43,600.00

16 P e k e r j a HOK 35,000.00

` 17 Buruh Terampil HOK 38,000.00

18 Buruh Tak Terampil HOK 34,000.00

19 Operator Terampil HOK 54,100.00

20 Pembantu Operator HOK 39,500.00

21 Sopir Terampil HOK 57,100.00

22 Pembantu Sopir HOK 36,500.00

23 Masinis HOK 50,166.67

24 K e r n e t HOK 35,625.00

25 P e n j a g a HOK 33,750.00

26 Penjaga Api HOK 37,500.00

27 Penganyam HOK 40,000.00

Tuban, Januari 2012

KEPALA BIDANG TATA RUANG DAN PEMUKIMAN

Ir. S A T R I Y O

NIP. 19590405 199003 1 005

Page 2: Analis 2012 Gedung

2

DAFTAR HARGA SATUAN BAHAN TAHUN ANGGARAN 2012

NO. JENIS / NAMA BAHAN SATUAN HARGA SATUAN

KETERANGAN (Rp.)

1 2 3 4 5

I BAHAN TANAH / PASIR

1 Tanah Urug 63,250.00

2 Pasir Urug 74,250.00

3 Pasir Cor 141,710.00

4 Pasir Lokal / Pasir Kali 85,800.00

5 Pasir Batu/ Sirtu Alam Hitam 102,666.67

6 Pasir Pasang 102,116.67

7 Pedel 66,660.00

8 Pasir Grosok 137,500.00

II BAHAN BATU

1 Batu Brongkol 82,775.00

2 Batu Kali hitam 97,900.00

3 Kerikil kali 60,500.00

4 Kerikil hias 50,050.00

5 Batu Pecah 3-5 mesin 194,857.14

6 Batu Pecah 2-3 mesin 212,850.00

7 Batu Pecah 1-2 mesin 224,675.00

8 Batu Pecah 1/2-1 mesin 189,200.00

9 Batu Pecah 5/7, 6/8 tangan 69,575.00

10 Batu Pecah 3/5 tangan 103,675.00

11 Batu Belah 20/25 tangan 66,550.00

12 Batu Belah 15/20 tangan 73,700.00

13 Batu Bata Kw. 1 bj 889.17

14 Batu Bata Kw. 2 bj 733.33

15 Batu Putih Lokal / kumbung bj 1,003.75

16 Pavingstone Beton Blok 6 Cm warna (K.200) 50,600.00

17 Pavingstone Beton Blok 6 Cm abu-abu ( k.200) 45,540.00

18 Pavingstone Beton abu-abu 8 cm (k.300) 60,500.00

19 Pavingstone Segienam Abu - abu 6 cm K 200 45,100.00

20 Pavingstone Segienam Warna 6 cm K 200 50,600.00

21 Pavingstone Segienam Warna tanpa K tb. 6 cm 38,940.00

22 Pavingstone Segienam Abu - abu tanpa K tb. 6 cm 35,200.00

23 Kerep uk. 0175x0,2x0,3x0,6 bj 49,500.00

24 Batu Palimanan uk.10/20 kasar 74,800.00

25 Batu Palimanan uk.15/15 halus 79,016.67

26 Batu Palimanan uk.15/30 81,400.00

27 Batu Palimanan uk.20/20 halus 82,500.00

28 Batu Palimanan uk.20/30 halus 87,083.33

29 Batu Palimanan uk. 5/20 72,966.67

30 Batu Palimanan uk. 10/10 71,500.00

31 Batu Palimanan uk. 20/40 89,833.33

32 Batu Palimanan uk. 25/25 85,983.33

33 Batu Palimanan uk. 30/30 96,800.00

34 Batu Palimanan Hijau Segala Ukuran 90,750.00

35 Batu Candi 107,250.00

36 Ornamen Batu Paras uk. 25/25 bh 85,250.00

37 Ornamen Batu Paras uk. 20/20 bh 88,000.00

38 Ornamen Batu Paras uk. 15/15 bh 77,000.00

39 Ornamen Batu Paras uk. 20/40 bh 99,000.00

40 Ornamen Batu Paras uk. 10/10 bh 11,000.00

41 Ornamen Batu Paras uk. 30/30 bh 38,500.00

42 Ornamen Batu Paras uk. 40/40 bh 57,750.00

43 Batu Gilang Hitam / Lempeng 42,625.00

44 Batu Raen Hitam bj 385.00

45 Batu Raen Kuning / Putih bj 275.00

46 Batu Alur Andesit 143,000.00

47 Batu Candi Alur / Beton 126,500.00

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

Page 3: Analis 2012 Gedung

3

NO. JENIS / NAMA BAHAN SATUAN HARGA SATUAN

KETERANGAN (Rp.)

1 2 3 4 548 Beton alur 20X40 cm 66,000.00

49 Lis Beton / Batu Alam 40 cm bh 18,150.00

50 Batu Alur Marmer 20x20 cm 121,000.00

51 Batu Alur Marmer 30x30 cm 132,000.00

52 Batu Alur Marmer 40x40 cm 143,000.00

53 Roster Terawang Bj 5,000.00

III BAHAN SEMEN / PC

1 Semen 40 kg zak 56,100.00 Semen Gresik

2 Semen Putih 40 kg zak 78,100.00 Tiga Roda

3 Semen Warna kg 6,500.00

IV BAHAN KAPUR

1 Kapur Bubuk / Kapur Pasang 199,833.33

2 Kapur Gamping kg 3,162.50

V BAHAN BESI

1 Besi Beton Polos (tulangan) kg 9,900.00

2 Besi Beton Ulir kg 10,560.00

3 Besi Beton Polos 16 mm Panjang 12 m ljr 158,007.14

4 Besi Beton Polos 12 mm Panjang 12 m ljr 89,283.33

5 Besi Beton Polos 10 mm Panjang 12 m ljr 61,600.00

6 Besi Beton Polos 8 mm Panjang 12 m ljr 40,700.00

7 Besi Beton Polos 6 mm Panjang 12 m ljr 24,860.00

8 Besi Beton Polos 5 mm Panjang 12 m ljr 16,280.00

9 Baja Konstruksi kg 14,535.00

10 Besi WF 150 Berat/Batang 168 kg kg 12,100.00

11 Besi WF 200 Berat/Batang 256 kg kg 11,550.00

12 Besi WF 250 Berat/Batang 355 kg kg 11,550.00

13 Besi WF 298 Berat/Batang 375 kg kg 12,100.00

14 Besi WF 300 Berat/Batang 432 kg kg 12,650.00

15 Besi WF 346 Berat/Batang 485 kg kg 12,650.00

16 Besi WF 350 Berat/Batang 584 kg kg 12,650.00

17 Besi WF 396 Berat/Batang 664 kg kg 12,650.00

18 Besi WF 400 Berat/Batang 778 kg kg 11,700.00

19 Besi WF 450 Berat/Batang 893 kg kg 11,700.00

20 Besi WF 500 Berat/Batang 1.053 kg kg 11,700.00

21 Besi WF 588 Berat/Batang 1.763 kg kg 11,700.00

22 Besi WF 600 Berat/Batang 1.238 kg kg 11,700.00

23 Besi Siku kg 8,250.00

24 Kawat Beton / Bendrat kg 19,030.00

25 kg 16,500.00

26 Besi Sheet Pile (400mm x 100mm X 10,5mm X 12m) kg 12,100.00

27 Besi strip kg 14,500.00

VI BAHAN KAYU

1 Ky. Jati balok ( Macam-macam Ukuran kelas 1 ) 11,000,000.00

2 Ky. Jati Papan ( Macam-macam Ukuran kelas 1 ) 12,460,000.00

3 Ky. Kamper Balok 8/15, 8/12, 6/12 = 4m kw. I 7,700,000.00

4 Ky. Kamper Papan 2/20, 3/20 = 4m kw. I 8,847,142.86

5 Ky. Kamper Usuk 5/7, 4/6 = 4m kw. I 6,128,571.43

6 Ky. Kamper Reng 2/3, 3/5 = 4m kw. I 5,028,571.43

7 Ky. Kamper Balok 8/15, 8/12, 6/12 = 4m kw. II 6,875,000.00

8 Ky. Kamper Papan 2/20, 3/20 = 4m kw. II 8,800,000.00

9 Ky. Kamper Usuk 5/7, 4/6 = 4m kw. II 4,950,000.00

10 Ky. Kamper Reng 2/3, 3/5 = 4m kw. II 4,317,500.00

11 Ky. Bengkirai Balok 8/15, 8/12 = 4 m Kw. I 7,768,750.00

12 Ky. Bengkirai Papan 2/20, 3/20 = 4 m Kw. I 8,786,250.00

13 Ky. Bengkirai Usuk 5/7, 4/6 = 4 m Kw. I 6,084,375.00

14 Ky. Bengkirai Reng kw. I 5,293,750.00

15 Ky. Bengkirai Balok 8/15, 8/12 = 4 m Kw. II 6,992,857.14

16 Ky. Bengkirai Papan 2/20, 3/20 = 4 m Kw. II 8,030,000.00

m2

m2

m2

m2

m3

Kawat Bronjong ( f 42,7 mm ) BMG 10

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

Page 4: Analis 2012 Gedung

4

NO. JENIS / NAMA BAHAN SATUAN HARGA SATUAN

KETERANGAN (Rp.)

1 2 3 4 517 Ky. Bengkirai Usuk 5/7, 4/6 = 4 m Kw. II 4,730,000.00

18 Ky. Bengkirai Reng kw. II 4,436,666.67

19 Ky. Meranti Balok 8/12, 6/12 = 4 m kw. I 4,739,166.67

20 Ky. Meranti Papan 2/20, 3/20 = 4 m kw. I 4,968,333.33

21 Ky. Meranti Usuk 4/6, 5/7 = 4 m kw. I 3,593,333.33

23 Ky. Meranti Balok 8/12, 6/12 = 4 m kw. II 4,418,333.33

24 Ky. Meranti Papan 2/20, 3/20 = 4 m kw. II 4,675,000.00

21 Ky. Meranti Usuk 4/6, 5/7 = 4 m kw. II 4,400,000.00

22 Ky. Meranti Reng 3,031,875.00

25 Ky. Papan Begesting 2/20 = 4 m 4,950,000.00

26 Ky. Acuan / cetakan 2,970,000.00

27 Dolken dia. 16X19 cm Pj. 4m bt 198,000.00

28 Dolken dia. 8 cm Pj. 4m bt 35,000.00

29 Bongkotan Pj. 3 m bt 17,600.00

30 Ky. Gelam Balok 6/12 & 8/12 4,022,857.14

VII BAHAN PIPA PARALON / PVC / 4M

1 Pipa PVC 1/2" AW ljr 23,818.67 Maspion

2 Pipa PVC 3/4" AW ljr 28,261.33

3 Pipa PVC 1" AW ljr 31,882.67

4 Pipa PVC 1 1/4" AW ljr 50,709.87

5 Pipa PVC 1 1/2" AW ljr 66,210.67

6 Pipa PVC 2" AW ljr 99,209.60

7 Pipa PVC 3" AW ljr 183,780.80

8 Pipa PVC 4" AW ljr 263,696.53

9 Pipa PVC 6" AW ljr 597,200.80

10 Pipa PVC 8" AW ljr 928,636.80

11 Pipa PVC 10" AW ljr 1,324,069.60

12 Pipa PVC 12" AW ljr 1,892,912.00

13 ljr 73,920.00

14 bh 1,437.33

15 Klem PVC bh 840.00

16 bh 1,456.00

17 Lem PVC Isarflas kaleng 6,626.67

18 Seal Tape bh 2,500.00

VIII BAHAN TEGEL

1 Tegel abu-abu 20x20 cm 35,200.00

2 Tegel Plin abu 15x20 cm 35,200.00

3 Tegel wafel 20x20 cm 35,200.00

4 Tegel teraso 30x30 cm -

IX BAHAN KERAMIK

1 Keramik 10x20 cm Mulia KW 1 42,240.00

2 Keramik Kembang 20x20 cm Kw. I Mulia 40,333.33

3 Keramik Kembang 20x25 KW 1 Roman 51,700.00

4 Keramik Kembang 20x25 KW 1 Asia 55,000.00

5 Keramik Kembang 20x25 KW 2 Asia 46,750.00

6 Keramik Motif 20x25 Kw. I Kobin 46,650.00

7 Keramik Motif 20x25 Kw. I Yupiter 35,750.00

8 Keramik Polos 20x25 Kw. I Mulia 38,500.00

9 Keramik Polos 20x25 Kw. I Asia 39,600.00

10 Keramik Sembur 30x30 cm KW 1 Mulia 35,475.00

11 Keramik Polos ( 30x30 cm ) KW 1 Mulia 31,114.29

12 Keramik Polos ( 30x30 cm ) KW 1 Roman 37,766.67

13 Keramik Polos ( 30x30 cm ) KW 2 Roman 35,200.00

14 Keramik Motif 30x30 Kw. I 44,000.00

15 Keramik Motif 30x30 Kw. I Yupiter 37,510.00

16 Keramik Motif ( 40x40 cm ) KW 1 Platinum 54,780.00

17 Keramik Motif ( 40x40 cm ) KW 1 Yupiter 46,750.00

18 Keramik Motif ( 40x40 cm ) KW 1 Arwana 53,350.00

19 Keramik Motif ( 40x40 cm ) KW 2 Arwana 40,700.00

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

Talang PVC f 4" = 4m

Knee PVC f 3/4"

Socket PVC f 3/4"

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

Page 5: Analis 2012 Gedung

5

NO. JENIS / NAMA BAHAN SATUAN HARGA SATUAN

KETERANGAN (Rp.)

1 2 3 4 520 Keramik Motif ( 40x40 cm ) KW 1 Garuda 44,000.00

21 Keramik Motif ( 40x40 cm ) KW 1 Indogres 132,000.00

22 Keramik Polos ( 40x40 cm ) KW 1 MAS 36,850.00

23 Keramik Kembang 50x50 cm KW 1 Milan 84,700.00

24 Keramik Motif 50x50 cm KW 1 Milan 74,800.00

25 Keramik Motif 50x50 cm KW 1 Platinum 71,500.00

26 Keramik Motif 60x60 cm KW 1 Platinum 126,500.00

27 Keramik Motif 25x40 cm KW 1 KIA 71,500.00

28 Keramik Motif 20x33 cm KW 1 Platinum 52,250.00

29 Border list 5x20 cm bj 3,300.00

30 Border list 7x20 cm bj 4,400.00

31 Kuku Macan Polos bj 921.25

32 Kuku Macan Ulir / Kembang bj 1,003.75

33 Roster Keramik (Besar) bh 44,000.00

34 Roster Keramik (Kecil) bh 31,900.00

35 Roster tanpa warna 40x40 cm bh 27,500.00

36 Roster tanpa warna 30x30 cm bh 26,400.00

37 Roster tanpa warna 30x60 cm bh 17,600.00

38 Roster tanpa warna 30x80 cm bh 24,750.00

39 Glass Blok Kecil bh 18,700.00

40 Glass Blok Besar 20x20 cm bh 19,800.00

41 Granito 60 x 60 cm 269,500.00

42 Marmer 100 x 100 cm 500,000.00

X BAHAN BUIS BETON

1 Buis beton bulat Dia 15 # 1 m bh 26,125.00

2 Buis beton bulat Dia 20 # 1 m bh 33,825.00

3 Buis beton bulat Dia 20 # 1/2 lingk. bh 17,875.00

4 Buis beton bulat Dia 30 # 1 m bh 49,500.00

5 Buis beton bulat Dia 30 # 1/2 lingk. bh 24,750.00

6 Buis beton bulat Dia 40 # 1 m bh 63,250.00

7 Buis beton bulat Dia 60 # 1 m bh 65,560.00

8 Buis decker Dia. 60 cm 1/2 lingk. bh 49,500.00

9 Buis beton Uk. 80x50 cm bh 74,250.00

XI BAHAN GENTENG

1 Genteng Pres bj 858.00

2 Genteng Bubungan Pres bj 1,815.00

3 Genteng Beton Besar isi 9,5 (buah) polos bj 2,970.00

4 Genteng Beton Kecil Isi 11 ( buah ) bj 2,750.00

5 Bubungan Beton bj 4,653.00

6 Genteng Jatiwangi isi 14,5 Bj/m2 bj 4,840.00

7 Wuwung Jatiwangi 3,5/m' bj 6,050.00

8 Genteng Keramik KIA Kecil bj 7,535.00

9 Bubungan Keramik KIA bj 44,825.00

10 Genteng Karangpilang Goodyear isi 21 bh bh 2,750.00

11 Bubungan Karangpilang goodyear bh 4,290.00

12 Genteng Kodok Ex. Wisma ( Kw. 2 ) bj 2,933.33

13 Genteng Kodok Ex. Wisma ( Kw. 1 ) bj 3,116.67

14 Genteng Karangpilang wisma isi 21 bh bh 2,750.00

15 Bubungan wisma bh 3,850.00

16 Genteng Pres Super mutiara soka Kebumen isi 25 bh bh 2,035.00

17 Bubungan mutiara sokka kebumen bh 3,300.00

18 Genteng Pres lokal SGN Purwodadi (kodok) isi 21 bh 785.71

19 Bubungan SGN bh 3,135.00

20 Jatiwangi Morando Atlas isi 21 bh (bakar gas) bh 2,750.00

21 Jatiwangi Morando Atlas isi 21 bh (bakar kayu) bh 2,090.00

22 Genteng Beton Besar isi 9,5 buah berwarna bj 3,300.00

23 Ornamen Wuwung sedang bh 38,500.00

24 Ornamen Wuwung besar bh 69,666.67

XII BAHAN ASBES

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

Page 6: Analis 2012 Gedung

6

NO. JENIS / NAMA BAHAN SATUAN HARGA SATUAN

KETERANGAN (Rp.)

1 2 3 4 51 Asbes Gel. Kecil 3,05 x 1,05 # 4 mm ( ex. Gresik ) lbr 106,150.00

2 Asbes Gel. Besar 3,05 x 1,05 # 4 m ( ex.Gresik ) lbr 109,725.00

3 Asbes Plat 1 x 1 m Gresik lbr 13,310.00

4 Asbes Plat 1 x 1 m Atrisco lbr 13,566.67

5 Papan Gibsum lbr 52,433.33

6 Nok Asbes Gelombang Besar Atrisco lbr 53,075.00

7 Nok Asbes Gelombang Kecil Atrisco lbr 28,526.67

XIII BAHAN KACA

1 Kaca Polos / Bening 3 mm 122X155 m2 49,500.00

2 Kaca Polos 5 mm m2 66,000.00

3 Kaca Rayban 5 mm m2 77,000.00 Asahimas

XIV BAHAN TRIPLEK

1 Triplek 122 x 244 x 4 mm lbr 57,585.00

2 Triplek 110 x 210 x 3 mm lbr 46,828.57

3 Teakwood 122 x 244 x 4 mm lbr 77,916.67

4 Teakwood 110 x 210 x 4 mm lbr 68,750.00

5 Tripleks Lapis Aluminium lbr 83,875.00

6 Kalsibout Uk. 2,44 x 1,22 m x 3,5 mm lbr 58,643.75

7 Multiplek / Flywood tb. 9 mm lbr 138,050.00

XV BAHAN SENG GELOMBANG

1 Seng Gel. BJLS 30.30 # 3 m lbr 121,733.33

2 Seng Gel. BJLS 30.30 # 1,8 m lbr 74,158.33

3 Seng Plat datar BJLS 30.45 # 1 m 8mm lbr 107,250.00

4 Seng Gel. BJLS 0,2 x 80 # 3 m lbr 67,375.00

XVI BAHAN ALAT PENGGANTUNG & PENGUNCI

1 Kunci Merk Kuda Terbang 2 X putar unit 58,378.57 Kuda Terbang

2 Kunci Merk Anchor 2 X putar unit 84,700.00 Anchor

3 Kunci Merk Union 2 X putar unit 49,500.00 Union

4 Kunci selot (KM/WC) unit 46,200.00

5 Engsel Nylon ARCH Asli (pintu) set 10,862.50

6 Engsel Nylon ARCH kecil set 8,800.00

7 Grendel pintu tanam bh 25,000.00

8 Grendel besar bh 22,550.00

9 Grendel kecil bh 8,616.67

10 Grendel Pring Kenit Kuningan bh 10,230.00

11 Hak Angin Panjang (Cantolan) stel 8,800.00

12 Hak Angin Sikutan stel 10,266.67

13 Pintu Plastik PVC 2 m x 0,70 bh 145,000.00

14 Pintu Plastik Germin 2 m x 0,70 bh 225,000.00

XVII BAHAN SANITASI

1 Kloset Jongkok Porselin bh 107,387.50 INA

2 Kloset Duduk Porselin (Monoblok) Warna Muda set 1,200,000.00 INA

3 Kloset Duduk Porselin Warna Muda set 423,500.00 INA

4 Kloset Duduk Porselin Komplit (Monoblok) set 1,600,000.00 TOTO

5 Sarangan Air / Avour (Stainlessteel) set 36,928.57

6 Kurasan Air Kuningan bh 16,971.43

7 Avour biasa bh 15,000.00

8 Kurasan Air Plastik bh 5,000.00

9 bh 30,250.00

10 Kran Air Wastafel bh 50,000.00

11 Urinoir bh 175,000.00

12 Sink Stainlees steel (1 bak cuci) bh 180,000.00

13 Bak Mandi Fiberglass bh 220,000.00

14 Wastafel bh 385,000.00

15 Wastafel Besar INA bh 130,000.00

16 Wastafel Besar PINK bh 175,000.00

Kran Air f 3/4" Sedang

Page 7: Analis 2012 Gedung

7

NO. JENIS / NAMA BAHAN SATUAN HARGA SATUAN

KETERANGAN (Rp.)

1 2 3 4 517 Bak WC Plastik bh 197,500.00

XVIII BAHAN PAKU

1 Paku Reng kg 14,223.00

2 Paku Usuk kg 13,343.00

3 Paku Triplek kg 18,656.00

4 Paku Seng kg 25,928.57

5 Paku Jembatan bj 14,300.00

6 Paku Kalsibout kg 24,322.20

7 Paku Sumbat bj 385.00

8 Paku Beton bj 3,674.00

9 Paku Asbes / paku payung kg 27,500.00

XIX BAHAN LISTRIK

1 Lampu TL 18 / 20 watt komplit bh 83,050.00

2 Lampu TL 36 / 40 watt komplit bh 100,650.00

3 Lampu Pijar 10 watt bh 3,960.00

4 Lampu Pijar 15 watt bh 3,960.00

5 Lampu Pijar 25 watt bh 4,015.00

6 Lampu Pijar 40 watt bh 4,125.00

7 Lampu Pijar 100 watt bh 4,950.00

8 Lampu Pijar warna 5 watt bh 3,245.00

9 Lampu Spot Light 100 W (warna) PNR 38/80 watt bh 65,450.00

10 Sakelar tunggal bh 12,925.00 Broco

11 Saklar Ganda bh 16,225.00 Broco

12 Stop Kontak bh 13,750.00 Broco

13 Sekring Otomatis 6 Amp bh 99,275.00

14 Sekring Otomatis 10 Amp bh 109,450.00

XX BAHAN CAT

1 Cat Kayu / Besi kg 58,300.00 Emco

2 Cat Tembok 5 Kg Galon 70,537.50 Paragon

3 Cat Tembok 5 Kg Galon 77,000.00 Decolith

4 Cat Genteng Galon 116,668.75

5 Cat Genteng Super Gloss Galon 222,750.00

6 Minyak Cat / Thiner B ltr 17,710.00

7 Cat Hermplastic kg 82,500.00

8 Lem kayu kg 17,500.00

9 Meni Kayu kg 20,507.14

10 Meni besi kg 20,507.14

11 Plamir Tembok 5 kg kg 44,000.00

12 Plamir untuk Plituran kg 27,500.00

13 Plamir Kayu Pedang kg 19,595.71

14 Cat Biru Berlin kg 57,860.00 Emco

15 Cat Hitam Gading kg 55,110.00 Emco

16 Cat Putih seng kg 45,173.33 Emco

17 Cat Kolam Rettar kg 72,930.00

18 Kertas Gosok 02 lbr 3,272.50

19 Kuas bh 9,900.00

20 Soda api kg 27,500.00

21 Vernis ltr 36,300.00

22 Politur ltr 70,400.00

23 Dempul / Wood filter kg 44,000.00

24 Pewarna / Wood sten kg 57,500.00

25 Melamine Seanding sealer kg 57,500.00

26 Melamin lack (glass / dop) kg 60,500.00

27 Compound kaleng 38,500.00

28 Spiritus ltr 13,475.00

29 Serlaag India ( Warna Kuning Tua Tipis ) kg 75,130.00

30 Batu Kambang kg 26,400.00

31 Kain Pop lbr 27,500.00

Page 8: Analis 2012 Gedung

8

NO. JENIS / NAMA BAHAN SATUAN HARGA SATUAN

KETERANGAN (Rp.)

1 2 3 4 532 No Drop kg 34,500.00

XXI BAHAN LAIN - LAIN

1 Solar ( Umum ) ltr 4,500.00

2 Gemuk / Grase ( Stempet ) kg 13,700.00

3 Gemuk / Grase ( Alat Berat ) kg 39,000.00

4 Dek Baut bh 10,000.00

5 Teer kg 8,200.00

6 Bron Ach kg 29,150.00

7 Minyak Tanah ( umum ) ltr 7,000.00

8 Premium ltr 4,500.00

9 Aspal Curah kg 8,000.00

10 Aspal Drum kg 9,600.00

11 Minyak Solar (Industri) ltr 12,400.00

12 Minyak Tanah (Industri) ltr 7,460.00

13 Kayu Bakar m 214,500.00

14 Minyak Pelumas ltr 24,400.00

15 Oli SAE 40 ltr 27,500.00

16 Stempet kg 13,700.00

17 Compressor jam 105,600.00

18 Alat Bantu set 71,500.00

19 Gedek Guling lbr 55,000.00

20 Bambu Petung ljr 16,500.00

21 Timah Hitam kg 21,780.00

22 Plat L kg 15,950.00

23 Plat U ( KAVEL ) kg 15,950.00

24 Karung Plastik ( Glangsing ) lbr 3,300.00

25 Ijuk kg 4,950.00

Tuban, Januari 2012

KEPALA BIDANG TATA RUANG DAN PEMUKIMAN

Ir. S A T R I Y O

NIP. 19590405 199003 1 005

Page 9: Analis 2012 Gedung

9

PEMERINTAH KABUPATEN TUBAN

DINAS PEKERJAAN UMUMANALISA HARGA SATUAN BAHAN DAN UPAH TENAGA

APBD TAHUN ANGGARAN 2012

PEKERJAAN PERSIAPAN / SNI 03-2835-2002

1. 1 M' PENGUKURAN DAN PEMASANGAN BOUWPLANK (SNI 03-2835-01)

0.0120 Kayu gelam 5/7 a. Rp. 4,022,857.14 = Rp. 48,274.29

0.0070 Kayu papan begesting a. Rp. 4,950,000.00 = Rp. 34,650.00

0.0200 kg Paku a. Rp. 13,343.00 = Rp. 266.86

0.1000 Pekerja a. Rp. 35,000.00 = Rp. 3,500.00

0.1000 Tukang kayu a. Rp. 49,000.00 = Rp. 4,900.00

0.0100 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 510.00

0.0050 Mandor a. Rp. 53,000.00 = Rp. 265.00

Jumlah = Rp. 92,366.15

Dibulatkan = Rp. 92,366.00

2. PEMBUATAN GUDANG SEMEN DAN ALAT-ALAT ( SNI 03-2835-02 )

0.2100 Kayu gelam a. Rp. 4,022,857.14 = Rp. 844,800.00

1.7000 Btg a. Rp. 35,000.00 = Rp. 59,500.00

0.3000 kg Paku a. Rp. 13,343.00 = Rp. 4,002.90

10.5000 kg Semen / PC a. Rp. 1,402.50 = Rp. 14,726.25

0.0300 Pasir beton a. Rp. 141,710.00 = Rp. 4,251.30

0.0500 Koral beton a. Rp. 212,850.00 = Rp. 10,642.50

1.5000 lbr Seng gelombang BJLS 30 a. Rp. 74,158.33 = Rp. 111,237.50

1.0000 Pekerja a. Rp. 35,000.00 = Rp. 35,000.00

2.0000 Tukang kayu a. Rp. 49,000.00 = Rp. 98,000.00

0.2000 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 10,200.00

0.0500 Mandor a. Rp. 53,000.00 = Rp. 2,650.00

Jumlah = Rp. 1,195,010.44

Dibulatkan = Rp. 1,195,010.00

3. 1 M' PAGAR SEMENTARA DARI SENG GELOMBANG t = 2m ( SNI 03-2835-03 )

0.0720 Kayu gelam 5/7 a. Rp. 4,022,857.14 = Rp. 289,645.71

1.2500 Btg a. Rp. 35,000.00 = Rp. 43,750.00

0.0600 kg Paku a. Rp. 13,343.00 = Rp. 800.58

2.5000 kg Semen / PC a. Rp. 1,402.50 = Rp. 3,506.25

0.0050 Pasir beton a. Rp. 141,710.00 = Rp. 708.55

0.0090 Koral beton a. Rp. 212,850.00 = Rp. 1,915.65

1.2000 lbr Seng gelombang BJLS 30 a. Rp. 74,158.33 = Rp. 88,990.00

0.4000 Pekerja a. Rp. 35,000.00 = Rp. 14,000.00

0.2000 Tukang kayu a. Rp. 49,000.00 = Rp. 9,800.00

0.0200 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 1,020.00

0.0200 Mandor a. Rp. 53,000.00 = Rp. 1,060.00

Jumlah = Rp. 455,196.74

Dibulatkan = Rp. 455,196.00

4. PEMBERSIHAN LOKASI DAN PERATAAN ( SNI 03-2835-04 )

0.1000 Pekerja a. Rp. 35,000.00 = Rp. 3,500.00

0.0500 Mandor a. Rp. 53,000.00 = Rp. 2,650.00

Jumlah = Rp. 6,150.00

Dibulatkan = Rp. 6,150.00

5. PEMBONGKARAN DINDING BATA MERAH ( SNI 03-2835-05 )

6.6670 Pekerja a. Rp. 35,000.00 = Rp. 233,345.00

0.0330 Mandor a. Rp. 53,000.00 = Rp. 1,749.00

Jumlah = Rp. 235,094.00

Jumlah = Rp. 28,211.26

Dibulatkan = Rp. 28,211.00

6. PEMBONGKARAN BETON BERTULANG ( SNI 03-2835-06 )

6.6670 Pekerja a. Rp. 35,000.00 = Rp. 233,345.00

0.3330 Mandor a. Rp. 53,000.00 = Rp. 17,649.00

Jumlah = Rp. 250,994.00

Dibulatkan = Rp. 250,994.00

m3

m3

1 M2

m3

Dolken kayu f 8 / 400 cm

m3

m3

m3

Dolken kayu f 8 / 400 cm

m3

m3

1 M2

1 M3

Analog biaya per M3

Analog biaya per M2

1 M3

Page 10: Analis 2012 Gedung

10

PEKERJAAN TANAH ( Rev. SNI 03-2835-2002 )

1. GALIAN TANAH s/d 1 M (SNI DT 91-0006-2007-01)

0.7500 Pekerja a. Rp. 35,000.00 = Rp. 26,250.00

0.0250 Mandor a. Rp. 53,000.00 = Rp. 1,325.00

Jumlah = Rp. 27,575.00

Dibulatkan = Rp. 27,575.00

2. GALIAN TANAH s/d 2 M (SNI DT 91-0006-2007-02)

0.9000 Pekerja a. Rp. 35,000.00 = Rp. 31,500.00

0.0450 Mandor a. Rp. 53,000.00 = Rp. 2,385.00

Jumlah = Rp. 33,885.00

Dibulatkan = Rp. 33,885.00

3. GALIAN TANAH s/d 3 M (SNI DT 91-0006-2007-03)

1.0500 Pekerja a. Rp. 35,000.00 = Rp. 36,750.00

0.0670 Mandor a. Rp. 53,000.00 = Rp. 3,551.00

Jumlah = Rp. 40,301.00

Dibulatkan = Rp. 40,301.00

4. GALIAN TANAH BERBATU (SNI DT 91-0006-2007-04)

1.0520 Pekerja a. Rp. 35,000.00 = Rp. 36,820.00

0.1040 Mandor a. Rp. 53,000.00 = Rp. 5,512.00

Jumlah = Rp. 42,332.00

Dibulatkan = Rp. 42,332.00

5. GALIAN TANAH KERAS SEDALAM 1 M (SNI DT 91-0006-2007-05)

1.0000 Pekerja a. Rp. 35,000.00 = Rp. 35,000.00

0.0320 Mandor a. Rp. 53,000.00 = Rp. 1,696.00

Jumlah = Rp. 36,696.00

Dibulatkan = Rp. 36,696.00

6. GALIAN TANAH CADAS SEDALAM 1 M (SNI DT 91-0006-2007-06)

1.5000 Pekerja a. Rp. 35,000.00 = Rp. 52,500.00

0.0600 Mandor a. Rp. 53,000.00 = Rp. 3,180.00

Jumlah = Rp. 55,680.00

Dibulatkan = Rp. 55,680.00

7. GALIAN TANAH LUMPUR SEDALAM 1 M (SNI DT 91-0006-2007-07)

1.2000 Pekerja a. Rp. 35,000.00 = Rp. 42,000.00

0.0450 Mandor a. Rp. 53,000.00 = Rp. 2,385.00

Jumlah = Rp. 44,385.00

Dibulatkan = Rp. 44,385.00

8. URUGAN TANAH KEMBALI (SNI DT 91-0006-2007-08)

0.2250 Pekerja a. Rp. 35,000.00 = Rp. 7,875.00

0.0075 Mandor a. Rp. 53,000.00 = Rp. 397.50

Jumlah = Rp. 8,272.50

Dibulatkan = Rp. 8,272.00

9. MENGURUK PONDASI DENGAN PASIR (SNI DT 91-0006-2007-09)

1.2000 Pasir urug a. Rp. 74,250.00 = Rp. 89,100.00

0.3000 Pekerja a. Rp. 35,000.00 = Rp. 10,500.00

0.0100 Mandor a. Rp. 53,000.00 = Rp. 530.00

Jumlah = Rp. 100,130.00

Dibulatkan = Rp. 100,130.00

10. MENGURUK DENGAN TANAH (SNI DT 91-0006-2007-10)

1.2000 Tanah Urug a. Rp. 63,250.00 = Rp. 75,900.00

0.3000 Pekerja a. Rp. 35,000.00 = Rp. 10,500.00

0.0100 Mandor a. Rp. 53,000.00 = Rp. 530.00

Jumlah = Rp. 86,930.00

Dibulatkan = Rp. 86,930.00

11. MENGURUK DENGAN SIRTU (SNI DT 91-0006-2007-11)

1.2000 Sirtu a. Rp. 102,666.67 = Rp. 123,200.00

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

m3

1 M3

m3

1 M3

m3

Page 11: Analis 2012 Gedung

11

0.2500 Pekerja a. Rp. 35,000.00 = Rp. 8,750.00

0.0250 Mandor a. Rp. 53,000.00 = Rp. 1,325.00

Jumlah = Rp. 133,275.00

Dibulatkan = Rp. 133,275.00

12. MENGURUK DENGAN PEDEL (SNI DT 91-0006-2007-12)

1.2000 Pedel a. Rp. 66,660.00 = Rp. 79,992.00

0.2500 Pekerja a. Rp. 35,000.00 = Rp. 8,750.00

0.0250 Mandor a. Rp. 53,000.00 = Rp. 1,325.00

Jumlah = Rp. 90,067.00

Dibulatkan = Rp. 90,067.00

13. MEMBUANG TANAH SEJAUH 30 M (SNI DT 91-0006-2007-13)

0.3300 Pekerja a. Rp. 35,000.00 = Rp. 11,550.00

0.0100 Mandor a. Rp. 53,000.00 = Rp. 530.00

Jumlah = Rp. 12,080.00

Dibulatkan = Rp. 12,080.00

14. MENGERJAKAN STRIPPING TEBING SETINGGI 1 M (SNI DT 91-0006-2007-14)

0.0500 Pekerja a. Rp. 35,000.00 = Rp. 1,750.00

0.0050 Mandor a. Rp. 53,000.00 = Rp. 265.00

Jumlah = Rp. 2,015.00

Dibulatkan = Rp. 2,015.00

1. PASANGAN AANSTAMPENG / BATU KOSONG (SNI DT 91-0007-2007-01)

1.2000 Brongkol a. Rp. 82,775.00 = Rp. 99,330.00

0.4320 Pasir urug a. Rp. 74,250.00 = Rp. 32,076.00

0.0390 Mandor a. Rp. 53,000.00 = Rp. 2,067.00

0.3900 Tukang batu a. Rp. 46,000.00 = Rp. 17,940.00

0.0390 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 1,989.00

0.7800 Pekerja a. Rp. 35,000.00 = Rp. 27,300.00

Jumlah = Rp. 180,702.00

Dibulatkan = Rp. 180,702.00

2. PASANGAN BATU GUNUNG/BRONGKOL 1:3:10 (SNI DT 91-0007-2007-02)

1.2000 Batu Brongkol a. Rp. 82,775.00 = Rp. 99,330.00

61.0000 kg Semen / PC a. Rp. 1,402.50 = Rp. 85,552.50

0.1470 Kapur Pasang a. Rp. 199,833.33 = Rp. 29,375.50

0.4920 Pasir pasang a. Rp. 102,116.67 = Rp. 50,241.40

0.6000 Tukang batu a. Rp. 46,000.00 = Rp. 27,600.00

0.0600 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 3,060.00

0.0750 Mandor a. Rp. 53,000.00 = Rp. 3,975.00

1.5000 Pekerja a. Rp. 35,000.00 = Rp. 52,500.00

Jumlah = Rp. 351,634.40

Dibulatkan = Rp. 351,634.00

3. PASANGAN BATU GUNUNG/BRONGKOL 1/4Pc : 1Kpr : 4Ps (SNI DT 91-0007-2007-03)

1.2000 Batu Brongkol a. Rp. 82,775.00 = Rp. 99,330.00

41.0000 kg Semen / PC a. Rp. 1,402.50 = Rp. 57,502.50

0.1310 Kapur Pasang a. Rp. 199,833.33 = Rp. 26,178.17

0.5230 Pasir pasang a. Rp. 102,116.67 = Rp. 53,407.02

0.6000 Tukang batu a. Rp. 46,000.00 = Rp. 27,600.00

0.0600 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 3,060.00

0.0750 Mandor a. Rp. 53,000.00 = Rp. 3,975.00

1.5000 Pekerja a. Rp. 35,000.00 = Rp. 52,500.00

Jumlah = Rp. 323,552.68

Dibulatkan = Rp. 323,552.00

4. PASANGAN BATU GUNUNG/BRONGKOL 1 : 3 (SNI DT 91-0007-2007-04)

1.2000 Batu Brongkol a. Rp. 82,775.00 = Rp. 99,330.00

202.0000 kg Semen / PC a. Rp. 1,402.50 = Rp. 283,305.00

0.4850 Pasir pasang a. Rp. 102,116.67 = Rp. 49,526.58

0.6000 Tukang batu a. Rp. 46,000.00 = Rp. 27,600.00

0.0600 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 3,060.00

0.0750 Mandor a. Rp. 53,000.00 = Rp. 3,975.00

1 M3

m3

1 M3

1 M2

PEKERJAAN PONDASI ( Rev. SNI 03-2836-2002 )

1 M3

m3

m3

1 M3

m3

m3

m3

1 M3

m3

m3

m3

1 M3

m3

m3

Page 12: Analis 2012 Gedung

12

1.5000 Pekerja a. Rp. 35,000.00 = Rp. 52,500.00

Jumlah = Rp. 519,296.58

Dibulatkan = Rp. 519,296.00

5. PASANGAN BATU GUNUNG/BRONGKOL 1 : 4 (SNI DT 91-0007-2007-05)

1.2000 Batu Brongkol a. Rp. 82,775.00 = Rp. 99,330.00

163.0000 kg Semen / PC a. Rp. 1,402.50 = Rp. 228,607.50

0.5200 Pasir pasang a. Rp. 102,116.67 = Rp. 53,100.67

0.6000 Tukang batu a. Rp. 46,000.00 = Rp. 27,600.00

0.0600 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 3,060.00

0.0750 Mandor a. Rp. 53,000.00 = Rp. 3,975.00

1.5000 Pekerja a. Rp. 35,000.00 = Rp. 52,500.00

Jumlah = Rp. 468,173.17

Dibulatkan = Rp. 468,173.00

6. PASANGAN BATU GUNUNG/BRONGKOL 1 : 5 (SNI DT 91-0007-2007-06)

1.2000 Batu Brongkol a. Rp. 82,775.00 = Rp. 99,330.00

136.0000 kg Semen / PC a. Rp. 1,402.50 = Rp. 190,740.00

0.5440 Pasir pasang a. Rp. 102,116.67 = Rp. 55,551.47

0.6000 Tukang batu a. Rp. 46,000.00 = Rp. 27,600.00

0.0600 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 3,060.00

0.0750 Mandor a. Rp. 53,000.00 = Rp. 3,975.00

1.5000 Pekerja a. Rp. 35,000.00 = Rp. 52,500.00

Jumlah = Rp. 432,756.47

Dibulatkan = Rp. 432,756.00

PEKERJAAN DINDING ( Rev. SNI 03-6897-2002 )

1. PASANGAN BATU KUMBUNG 1 BATA 1:3:10 ( An.D.01 )

100 bj Batu kumbung a. Rp. 1,003.75 = Rp. 100,375.00

10.0800 kg Semen / PC a. Rp. 1,402.50 = Rp. 14,137.20

0.0275 Kapur Pasang a. Rp. 199,833.33 = Rp. 5,495.42

0.0925 Pasir pasang a. Rp. 102,116.67 = Rp. 9,445.79

0.2000 Tukang batu a. Rp. 46,000.00 = Rp. 9,200.00

0.0200 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 1,020.00

0.0300 Mandor a. Rp. 53,000.00 = Rp. 1,590.00

0.6000 Pekerja a. Rp. 35,000.00 = Rp. 21,000.00

Jumlah = Rp. 162,263.41

Dibulatkan = Rp. 162,263.00

2. PASANGAN BATU KUMBUNG 1 BATA 1 : 4 ( An.D.02 )

100 bj Batu kumbung a. Rp. 1,003.75 = Rp. 100,375.00

26.5500 kg Semen / PC a. Rp. 1,402.50 = Rp. 37,236.38

0.0930 Pasir pasang a. Rp. 102,116.67 = Rp. 9,496.85

0.2000 Tukang batu a. Rp. 46,000.00 = Rp. 9,200.00

0.0200 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 1,020.00

0.0300 Mandor a. Rp. 53,000.00 = Rp. 1,590.00

0.6000 Pekerja a. Rp. 35,000.00 = Rp. 21,000.00

Jumlah = Rp. 179,918.23

Dibulatkan = Rp. 179,918.00

3. PASANGAN BATU KUMBUNG 1/2 BATA 1:3:10 ( An.D.03 )

50 bj Batu kumbung a. Rp. 1,003.75 = Rp. 50,187.50

4.5000 kg Semen / PC a. Rp. 1,402.50 = Rp. 6,311.25

0.0150 Kapur Pasang a. Rp. 199,833.33 = Rp. 2,997.50

0.0500 Pasir pasang a. Rp. 102,116.67 = Rp. 5,105.83

0.1000 Tukang batu a. Rp. 46,000.00 = Rp. 4,600.00

0.0100 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 510.00

0.0150 Mandor a. Rp. 53,000.00 = Rp. 795.00

0.3000 Pekerja a. Rp. 35,000.00 = Rp. 10,500.00

Jumlah = Rp. 81,007.08

Dibulatkan = Rp. 81,007.00

4. PASANGAN BATU KUMBUNG 1/2 BATA 1:4 ( An.D.04 )

50 bj Batu kumbung a. Rp. 1,003.75 = Rp. 50,187.50

11.5000 kg Semen / PC a. Rp. 1,402.50 = Rp. 16,128.75

0.0430 Pasir pasang a. Rp. 102,116.67 = Rp. 4,391.02

0.1000 Tukang batu a. Rp. 46,000.00 = Rp. 4,600.00

1 M3

m3

m3

1 M3

m3

m3

1 M2

m3

m3

1 M2

m3

1 M2

m3

m3

1 M2

m3

Page 13: Analis 2012 Gedung

13

0.0100 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 510.00

0.0150 Mandor a. Rp. 53,000.00 = Rp. 795.00

0.3000 Pekerja a. Rp. 35,000.00 = Rp. 10,500.00

Jumlah = Rp. 87,112.27

Dibulatkan = Rp. 87,112.00

5. PASANGAN BATA MERAH 1 : 2 TB. 1 BATA (SNI DT 91-0009-2007-01)

140 bj Bata merah Kw I a. Rp. 889.17 = Rp. 124,483.80

43.5000 kg Semen / PC a. Rp. 1,402.50 = Rp. 61,008.75

0.0800 Pasir pasang a. Rp. 102,116.67 = Rp. 8,169.33

0.2000 Tukang batu a. Rp. 46,000.00 = Rp. 9,200.00

0.0200 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 1,020.00

0.0300 Mandor a. Rp. 53,000.00 = Rp. 1,590.00

0.6000 Pekerja a. Rp. 35,000.00 = Rp. 21,000.00

Jumlah = Rp. 226,471.88

Dibulatkan = Rp. 226,471.00

6. PASANGAN BATA MERAH 1 : 2 TB. 1 BATA (SNI DT 91-0009-2007-02)

140 bj Bata merah Kw II a. Rp. 733.33 = Rp. 102,666.20

43.5000 kg Semen / PC a. Rp. 1,402.50 = Rp. 61,008.75

0.0800 Pasir pasang a. Rp. 102,116.67 = Rp. 8,169.33

0.2000 Tukang batu a. Rp. 46,000.00 = Rp. 9,200.00

0.0200 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 1,020.00

0.0300 Mandor a. Rp. 53,000.00 = Rp. 1,590.00

0.6000 Pekerja a. Rp. 35,000.00 = Rp. 21,000.00

Jumlah = Rp. 204,654.28

Dibulatkan = Rp. 204,654.00

7. PASANGAN BATA MERAH 1 : 3 : 10 TB. 1 BATA (SNI DT 91-0009-2007-03)

140 bj Bata merah Kw II a. Rp. 733.33 = Rp. 102,666.20

10.0800 kg Semen / PC a. Rp. 1,402.50 = Rp. 14,137.20

0.0275 Kapur Pasang a. Rp. 199,833.33 = Rp. 5,495.42

0.0925 Pasir pasang a. Rp. 102,116.67 = Rp. 9,445.79

0.2000 Tukang batu a. Rp. 46,000.00 = Rp. 9,200.00

0.0200 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 1,020.00

0.0300 Mandor a. Rp. 53,000.00 = Rp. 1,590.00

0.6000 Pekerja a. Rp. 35,000.00 = Rp. 21,000.00

Jumlah = Rp. 164,554.61

Dibulatkan = Rp. 164,554.00

8. PASANGAN BATA MERAH 1 : 3 TB. 1 BATA (SNI DT 91-0009-2007-04)

140 bj Bata merah kw I a. Rp. 889.17 = Rp. 124,483.80

32.9500 kg Semen / PC a. Rp. 1,402.50 = Rp. 46,212.38

0.0910 Pasir pasang a. Rp. 102,116.67 = Rp. 9,292.62

0.2000 Tukang batu a. Rp. 46,000.00 = Rp. 9,200.00

0.0200 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 1,020.00

0.0300 Mandor a. Rp. 53,000.00 = Rp. 1,590.00

0.6000 Pekerja a. Rp. 35,000.00 = Rp. 21,000.00

Jumlah = Rp. 212,798.79

Dibulatkan = Rp. 212,798.00

9. PASANGAN BATA MERAH 1 : 3 TB. 1 BATA (SNI DT 91-0009-2007-05)

140 bj Bata merah kw II a. Rp. 733.33 = Rp. 102,666.20

32.9500 kg Semen / PC a. Rp. 1,402.50 = Rp. 46,212.38

0.0910 Pasir pasang a. Rp. 102,116.67 = Rp. 9,292.62

0.2000 Tukang batu a. Rp. 46,000.00 = Rp. 9,200.00

0.0200 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 1,020.00

0.0300 Mandor a. Rp. 53,000.00 = Rp. 1,590.00

0.6000 Pekerja a. Rp. 35,000.00 = Rp. 21,000.00

Jumlah = Rp. 190,981.19

Dibulatkan = Rp. 190,981.00

10. PASANGAN BATA MERAH 1 : 4 TB. 1 BATA (SNI DT 91-0009-2007-06)

140 bj Bata merah kw I a. Rp. 889.17 = Rp. 124,483.80

26.5500 kg Semen / PC a. Rp. 1,402.50 = Rp. 37,236.38

0.0930 Pasir pasang a. Rp. 102,116.67 = Rp. 9,496.85

0.2000 Tukang batu a. Rp. 46,000.00 = Rp. 9,200.00

0.0200 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 1,020.00

1 M2

m3

1 M2

m3

1 M2

m3

m3

1 M2

m3

1 M2

m3

1 M2

m3

Page 14: Analis 2012 Gedung

14

0.0300 Mandor a. Rp. 53,000.00 = Rp. 1,590.00

0.6000 Pekerja a. Rp. 35,000.00 = Rp. 21,000.00

Jumlah = Rp. 204,027.03

Dibulatkan = Rp. 204,027.00

11. PASANGAN BATA MERAH 1 : 4 TB. 1 BATA (SNI DT 91-0009-2007-07)

140 bj Bata merah kw II a. Rp. 733.33 = Rp. 102,666.20

26.5500 kg Semen / PC a. Rp. 1,402.50 = Rp. 37,236.38

0.0930 Pasir pasang a. Rp. 102,116.67 = Rp. 9,496.85

0.2000 Tukang batu a. Rp. 46,000.00 = Rp. 9,200.00

0.0200 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 1,020.00

0.0300 Mandor a. Rp. 53,000.00 = Rp. 1,590.00

0.6000 Pekerja a. Rp. 35,000.00 = Rp. 21,000.00

Jumlah = Rp. 182,209.43

Dibulatkan = Rp. 182,209.00

12. PASANGAN BATA MERAH 1 : 5 TB. 1 BATA (SNI DT 91-0009-2007-08)

140 bj Bata merah kw II a. Rp. 733.33 = Rp. 102,666.20

22.2000 kg Semen / PC a. Rp. 1,402.50 = Rp. 31,135.50

0.1020 Pasir pasang a. Rp. 102,116.67 = Rp. 10,415.90

0.2000 Tukang batu a. Rp. 46,000.00 = Rp. 9,200.00

0.0200 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 1,020.00

0.0300 Mandor a. Rp. 53,000.00 = Rp. 1,590.00

0.6000 Pekerja a. Rp. 35,000.00 = Rp. 21,000.00

Jumlah = Rp. 177,027.60

Dibulatkan = Rp. 177,027.00

13. PASANGAN BATA MERAH 1 : 2 TB. 1/2 BATA (SNI DT 91-0009-2007-09)

70 bj Bata merah Kw I a. Rp. 889.17 = Rp. 62,241.90

18.9500 kg Semen / PC a. Rp. 1,402.50 = Rp. 26,577.38

0.0380 Pasir pasang a. Rp. 102,116.67 = Rp. 3,880.43

0.1000 Tukang batu a. Rp. 46,000.00 = Rp. 4,600.00

0.0100 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 510.00

0.0150 Mandor a. Rp. 53,000.00 = Rp. 795.00

0.3000 Pekerja a. Rp. 35,000.00 = Rp. 10,500.00

Jumlah = Rp. 109,104.71

Dibulatkan = Rp. 109,104.00

14. PASANGAN BATA MERAH 1 : 2 TB. 1/2 BATA (SNI DT 91-0009-2007-10)

70 bj Bata merah Kw II a. Rp. 733.33 = Rp. 51,333.10

18.9500 kg Semen / PC a. Rp. 1,402.50 = Rp. 26,577.38

0.0380 Pasir pasang a. Rp. 102,116.67 = Rp. 3,880.43

0.1000 Tukang batu a. Rp. 46,000.00 = Rp. 4,600.00

0.0100 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 510.00

0.0150 Mandor a. Rp. 53,000.00 = Rp. 795.00

0.3000 Pekerja a. Rp. 35,000.00 = Rp. 10,500.00

Jumlah = Rp. 98,195.91

Dibulatkan = Rp. 98,195.00

15. PASANGAN BATA MERAH 1 : 3 TB. 1/2 BATA (SNI DT 91-0009-2007-11)

70 bj Bata merah kw I a. Rp. 889.17 = Rp. 62,241.90

14.3700 kg Semen / PC a. Rp. 1,402.50 = Rp. 20,153.93

0.0400 Pasir pasang a. Rp. 102,116.67 = Rp. 4,084.67

0.1000 Tukang batu a. Rp. 46,000.00 = Rp. 4,600.00

0.0100 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 510.00

0.0150 Mandor a. Rp. 53,000.00 = Rp. 795.00

0.3000 Pekerja a. Rp. 35,000.00 = Rp. 10,500.00

Jumlah = Rp. 102,885.49

Dibulatkan = Rp. 102,885.00

16. PASANGAN BATA MERAH 1 : 3 TB. 1/2 BATA (SNI DT 91-0009-2007-12)

70 bj Bata merah kw II a. Rp. 733.33 = Rp. 51,333.10

14.3700 kg Semen / PC a. Rp. 1,402.50 = Rp. 20,153.93

0.0400 Pasir pasang a. Rp. 102,116.67 = Rp. 4,084.67

0.1000 Tukang batu a. Rp. 46,000.00 = Rp. 4,600.00

0.0100 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 510.00

0.0150 Mandor a. Rp. 53,000.00 = Rp. 795.00

0.3000 Pekerja a. Rp. 35,000.00 = Rp. 10,500.00

1 M2

m3

1 M2

m3

1 M2

m3

1 M2

m3

1 M2

m3

1 M2

m3

Page 15: Analis 2012 Gedung

15

Jumlah = Rp. 91,976.69

Dibulatkan = Rp. 91,976.00

17. PASANGAN BATA MERAH 1 : 4 TB. 1/2 BATA (SNI DT 91-0009-2007-13)

70 bj Bata merah kw I a. Rp. 889.17 = Rp. 62,241.90

11.5000 kg Semen / PC a. Rp. 1,402.50 = Rp. 16,128.75

0.0430 Pasir pasang a. Rp. 102,116.67 = Rp. 4,391.02

0.1000 Tukang batu a. Rp. 46,000.00 = Rp. 4,600.00

0.0100 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 510.00

0.0150 Mandor a. Rp. 53,000.00 = Rp. 795.00

0.3000 Pekerja a. Rp. 35,000.00 = Rp. 10,500.00

Jumlah = Rp. 99,166.67

Dibulatkan = Rp. 99,166.00

18. PASANGAN BATA MERAH 1 : 4 TB. 1/2 BATA (SNI DT 91-0009-2007-14)

70 bj Bata merah kw II a. Rp. 733.33 = Rp. 51,333.10

11.5000 kg Semen / PC a. Rp. 1,402.50 = Rp. 16,128.75

0.0430 Pasir pasang a. Rp. 102,116.67 = Rp. 4,391.02

0.1000 Tukang batu a. Rp. 46,000.00 = Rp. 4,600.00

0.0100 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 510.00

0.0150 Mandor a. Rp. 53,000.00 = Rp. 795.00

0.3000 Pekerja a. Rp. 35,000.00 = Rp. 10,500.00

Jumlah = Rp. 88,257.87

Dibulatkan = Rp. 88,257.00

19. PASANGAN BATA MERAH 1 : 5 TB. 1/2 BATA (SNI DT 91-0009-2007-15)

70 bj Bata merah kw I a. Rp. 889.17 = Rp. 62,241.90

9.6800 kg Semen / PC a. Rp. 1,402.50 = Rp. 13,576.20

0.0450 Pasir pasang a. Rp. 102,116.67 = Rp. 4,595.25

0.1000 Tukang batu a. Rp. 46,000.00 = Rp. 4,600.00

0.0100 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 510.00

0.0150 Mandor a. Rp. 53,000.00 = Rp. 795.00

0.3000 Pekerja a. Rp. 35,000.00 = Rp. 10,500.00

Jumlah = Rp. 96,818.35

Dibulatkan = Rp. 96,818.00

20. PASANGAN BATA MERAH 1 : 5 TB. 1/2 BATA (SNI DT 91-0009-2007-16)

70 bj Bata merah kw II a. Rp. 733.33 = Rp. 51,333.10

9.6800 kg Semen / PC a. Rp. 1,402.50 = Rp. 13,576.20

0.0450 Pasir pasang a. Rp. 102,116.67 = Rp. 4,595.25

0.1000 Tukang batu a. Rp. 46,000.00 = Rp. 4,600.00

0.0100 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 510.00

0.0150 Mandor a. Rp. 53,000.00 = Rp. 795.00

0.3000 Pekerja a. Rp. 35,000.00 = Rp. 10,500.00

Jumlah = Rp. 85,909.55

Dibulatkan = Rp. 85,909.00

21. PASANGAN BATA MERAH 1 : 3 : 10 TB. 1/2 BATA (SNI DT 91-0009-2007-17)

70 bj Bata merah Kw II a. Rp. 733.33 = Rp. 51,333.10

4.5000 kg Semen / PC a. Rp. 1,402.50 = Rp. 6,311.25

0.0150 Kapur Pasang a. Rp. 199,833.33 = Rp. 2,997.50

0.0500 Pasir pasang a. Rp. 102,116.67 = Rp. 5,105.83

0.1000 Tukang batu a. Rp. 46,000.00 = Rp. 4,600.00

0.0100 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 510.00

0.0150 Mandor a. Rp. 53,000.00 = Rp. 795.00

0.3000 Pekerja a. Rp. 35,000.00 = Rp. 10,500.00

Jumlah = Rp. 82,152.68

Dibulatkan = Rp. 82,152.00

22. PASANGAN DINDING ROSTER/TERAWANG 12X11X24 CM 1 : 3 (SNI DT 91-0009-2007-18)

30 bh Roster/terawang a. Rp. 5,000.00 = Rp. 150,000.00

14.0000 kg Semen / PC a. Rp. 1,402.50 = Rp. 19,635.00

0.0320 Pasir pasang a. Rp. 102,116.67 = Rp. 3,267.73

0.1000 Tukang batu a. Rp. 46,000.00 = Rp. 4,600.00

0.0100 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 510.00

0.0150 Mandor a. Rp. 53,000.00 = Rp. 795.00

0.3000 Pekerja a. Rp. 35,000.00 = Rp. 10,500.00

Jumlah = Rp. 189,307.73

1 M2

m3

1 M2

m3

1 M2

m3

1 M2

m3

1 M2

m3

m3

1 M2

m3

Page 16: Analis 2012 Gedung

16

Dibulatkan = Rp. 189,307.00

23. PASANGAN DINDING BATU TEMPEL HITAM (SNI DT 91-0009-2007-19)

1.1000 Batu Tempel Hitam a. Rp. 42,625.00 = Rp. 46,887.50

11.7500 kg Semen / PC a. Rp. 1,402.50 = Rp. 16,479.38

0.0350 Pasir pasang a. Rp. 102,116.67 = Rp. 3,574.08

0.3500 Tukang batu a. Rp. 46,000.00 = Rp. 16,100.00

0.0350 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 1,785.00

0.0300 Mandor a. Rp. 53,000.00 = Rp. 1,590.00

0.6200 Pekerja a. Rp. 35,000.00 = Rp. 21,700.00

Jumlah = Rp. 108,115.96

Dibulatkan = Rp. 108,115.00

24. PASANGAN DINDING BATU PARAS (SNI DT 91-0009-2007-20)

1.1000 Batu Paras 20x20 cm a. Rp. 88,000.00 = Rp. 96,800.00

11.7500 kg Semen / PC a. Rp. 1,402.50 = Rp. 16,479.38

0.0350 Pasir pasang a. Rp. 102,116.67 = Rp. 3,574.08

0.3500 Tukang batu a. Rp. 46,000.00 = Rp. 16,100.00

0.0350 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 1,785.00

0.0300 Mandor a. Rp. 53,000.00 = Rp. 1,590.00

0.6200 Pekerja a. Rp. 35,000.00 = Rp. 21,700.00

Jumlah = Rp. 158,028.46

Dibulatkan = Rp. 158,028.00

25. PASANGAN BATU PALIMANAN ( An.D.05 )

1.1000 Batu Palimanan Halus 15/15 a. Rp. 79,016.67 = Rp. 86,918.34

11.7500 kg Semen / PC a. Rp. 1,402.50 = Rp. 16,479.38

0.0350 Pasir pasang a. Rp. 102,116.67 = Rp. 3,574.08

0.3500 Tukang batu a. Rp. 46,000.00 = Rp. 16,100.00

0.0350 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 1,785.00

0.0300 Mandor a. Rp. 53,000.00 = Rp. 1,590.00

0.6200 Pekerja a. Rp. 35,000.00 = Rp. 21,700.00

Jumlah = Rp. 148,146.80

Dibulatkan = Rp. 148,146.00

26. PASANGAN BETON ALUR ( An.D.06 )

1.1000 Beton alur a. Rp. 66,000.00 = Rp. 72,600.00

11.7500 kg Semen / PC a. Rp. 1,402.50 = Rp. 16,479.38

0.0350 Pasir pasang a. Rp. 102,116.67 = Rp. 3,574.08

0.3500 Tukang batu a. Rp. 46,000.00 = Rp. 16,100.00

0.0350 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 1,785.00

0.0300 Mandor a. Rp. 53,000.00 = Rp. 1,590.00

0.6200 Pekerja a. Rp. 35,000.00 = Rp. 21,700.00

Jumlah = Rp. 133,828.46

Dibulatkan = Rp. 133,828.00

27 PASANGAN BATU CANDI ( An.D.07 )

1.1000 Batu Candi a. Rp. 107,250.00 = Rp. 117,975.00

11.7500 kg Semen / PC a. Rp. 1,402.50 = Rp. 16,479.38

0.0350 Pasir pasang a. Rp. 102,116.67 = Rp. 3,574.08

0.3500 Tukang batu a. Rp. 46,000.00 = Rp. 16,100.00

0.0350 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 1,785.00

0.0300 Mandor a. Rp. 53,000.00 = Rp. 1,590.00

0.6200 Pekerja a. Rp. 35,000.00 = Rp. 21,700.00

Jumlah = Rp. 179,203.46

Dibulatkan = Rp. 179,203.00

28 PASANGAN BATU SISIR (ANDESIT) ( An.D.08 )

1.1000 Batu sisir a. Rp. 143,000.00 = Rp. 157,300.00

11.7500 kg Semen / PC a. Rp. 1,402.50 = Rp. 16,479.38

0.0350 Pasir pasang a. Rp. 102,116.67 = Rp. 3,574.08

0.3500 Tukang batu a. Rp. 46,000.00 = Rp. 16,100.00

0.0350 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 1,785.00

0.0300 Mandor a. Rp. 53,000.00 = Rp. 1,590.00

0.6200 Pekerja a. Rp. 35,000.00 = Rp. 21,700.00

Jumlah = Rp. 218,528.46

Dibulatkan = Rp. 218,528.00

1 M2

m2

m3

1 M2

m2

m3

1 M2

m2

m3

1 M2

m2

m3

1 M2

m2

m3

1 M2

m2

m3

Page 17: Analis 2012 Gedung

17

PEKERJAAN PLESTERAN ( SNI DT 91-0010-2007 )

1. PLESTERAN 1 : 2 Tebal 1.5 cm (SNI DT 91-0010-2007-01)

10.2240 kg Semen / PC a. Rp. 1,402.50 = Rp. 14,339.16

0.0200 Pasir pasang a. Rp. 102,116.67 = Rp. 2,042.33

0.1500 Tukang batu a. Rp. 46,000.00 = Rp. 6,900.00

0.0150 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 765.00

0.0100 Mandor a. Rp. 53,000.00 = Rp. 530.00

0.2000 Pekerja a. Rp. 35,000.00 = Rp. 7,000.00

Jumlah = Rp. 31,576.49

Dibulatkan = Rp. 31,576.00

2. PLESTERAN 1 : 3 Tebal 1,5 cm (SNI DT 91-0010-2007-02)

7.7760 kg Semen / PC a. Rp. 1,402.50 = Rp. 10,905.84

0.0230 Pasir pasang a. Rp. 102,116.67 = Rp. 2,348.68

0.1500 Tukang batu a. Rp. 46,000.00 = Rp. 6,900.00

0.0150 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 765.00

0.0100 Mandor a. Rp. 53,000.00 = Rp. 530.00

0.2000 Pekerja a. Rp. 35,000.00 = Rp. 7,000.00

Jumlah = Rp. 28,449.52

Dibulatkan = Rp. 28,449.00

3. PLESTERAN 1 : 4 Tebal 1,5 cm (SNI DT 91-0010-2007-03)

6.2400 kg Semen / PC a. Rp. 1,402.50 = Rp. 8,751.60

0.0240 Pasir pasang a. Rp. 102,116.67 = Rp. 2,450.80

0.1500 Tukang batu a. Rp. 46,000.00 = Rp. 6,900.00

0.0150 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 765.00

0.0100 Mandor a. Rp. 53,000.00 = Rp. 530.00

0.2000 Pekerja a. Rp. 35,000.00 = Rp. 7,000.00

Jumlah = Rp. 26,397.40

Dibulatkan = Rp. 26,397.00

4. PLESTERAN 1 : 5 Tebal 1,5 cm (SNI DT 91-0010-2007-04)

5.1840 kg Semen / PC a. Rp. 1,402.50 = Rp. 7,270.56

0.0260 Pasir pasang a. Rp. 102,116.67 = Rp. 2,655.03

0.1500 Tukang batu a. Rp. 46,000.00 = Rp. 6,900.00

0.0150 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 765.00

0.0100 Mandor a. Rp. 53,000.00 = Rp. 530.00

0.2000 Pekerja a. Rp. 35,000.00 = Rp. 7,000.00

Jumlah = Rp. 25,120.59

Dibulatkan = Rp. 25,120.00

5. PLESTERAN 1 : 3 Tebal 2 cm (SNI DT 91-0010-2007-05)

10.3680 kg Semen / PC a. Rp. 1,402.50 = Rp. 14,541.12

0.0310 Pasir pasang a. Rp. 102,116.67 = Rp. 3,165.62

0.2000 Tukang batu a. Rp. 46,000.00 = Rp. 9,200.00

0.0200 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 1,020.00

0.0130 Mandor a. Rp. 53,000.00 = Rp. 689.00

0.2600 Pekerja a. Rp. 35,000.00 = Rp. 9,100.00

Jumlah = Rp. 37,715.74

Dibulatkan = Rp. 37,715.00

6. PLESTERAN 1 : 4 Tebal 2 cm (SNI DT 91-0010-2007-06)

8.3200 kg Semen / PC a. Rp. 1,402.50 = Rp. 11,668.80

0.0320 Pasir pasang a. Rp. 102,116.67 = Rp. 3,267.73

0.2000 Tukang batu a. Rp. 46,000.00 = Rp. 9,200.00

0.0200 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 1,020.00

0.0130 Mandor a. Rp. 53,000.00 = Rp. 689.00

0.2600 Pekerja a. Rp. 35,000.00 = Rp. 9,100.00

Jumlah = Rp. 34,945.53

Dibulatkan = Rp. 34,945.00

7. PLESTERAN 1 : 5 Tebal 2 cm (SNI DT 91-0010-2007-07)

6.9120 kg Semen / PC a. Rp. 1,402.50 = Rp. 9,694.08

0.0350 Pasir pasang a. Rp. 102,116.67 = Rp. 3,574.08

0.2000 Tukang batu a. Rp. 46,000.00 = Rp. 9,200.00

0.0200 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 1,020.00

0.0130 Mandor a. Rp. 53,000.00 = Rp. 689.00

0.2600 Pekerja a. Rp. 35,000.00 = Rp. 9,100.00

1 M2

m3

1 M2

m3

1 M2

m3

1 M2

m3

1 M2

m3

1 M2

m3

1 M2

m3

Page 18: Analis 2012 Gedung

18

Jumlah = Rp. 33,277.16

Dibulatkan = Rp. 33,277.00

8. PLESTERAN CIPRAT 1 : 2 (SNI DT 91-0010-2007-08)

4.3200 kg Semen / PC a. Rp. 1,402.50 = Rp. 6,058.80

0.0060 Pasir pasang a. Rp. 102,116.67 = Rp. 612.70

0.1000 Tukang batu a. Rp. 46,000.00 = Rp. 4,600.00

0.0100 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 510.00

0.0150 Mandor a. Rp. 53,000.00 = Rp. 795.00

0.3000 Pekerja a. Rp. 35,000.00 = Rp. 10,500.00

Jumlah = Rp. 23,076.50

Dibulatkan = Rp. 23,076.00

9. FINISHING SIAR PASANGAN DINDING BATA MERAH (SNI DT 91-0010-2007-09)

3.1080 kg Semen / PC a. Rp. 1,402.50 = Rp. 4,358.97

0.0750 Tukang batu a. Rp. 46,000.00 = Rp. 3,450.00

0.0075 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 382.50

0.0080 Mandor a. Rp. 53,000.00 = Rp. 424.00

0.1500 Pekerja a. Rp. 35,000.00 = Rp. 5,250.00

Jumlah = Rp. 13,865.47

Dibulatkan = Rp. 13,865.00

10. FINISHING SIAR PASANGAN BATU KALI 1 : 2 (SNI DT 91-0010-2007-10)

6.3400 kg Semen / PC a. Rp. 1,402.50 = Rp. 8,891.85

0.0120 Pasir pasang a. Rp. 102,116.67 = Rp. 1,225.40

0.1500 Tukang batu a. Rp. 46,000.00 = Rp. 6,900.00

0.0150 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 765.00

0.0150 Mandor a. Rp. 53,000.00 = Rp. 795.00

0.3000 Pekerja a. Rp. 35,000.00 = Rp. 10,500.00

Jumlah = Rp. 29,077.25

Dibulatkan = Rp. 29,077.00

11. PEKERJAAN ACIAN (SNI DT 91-0010-2007-11)

3.2500 kg Semen / PC a. Rp. 1,402.50 = Rp. 4,558.13

0.1000 Tukang batu a. Rp. 46,000.00 = Rp. 4,600.00

0.0100 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 510.00

0.0100 Mandor a. Rp. 53,000.00 = Rp. 530.00

0.2000 Pekerja a. Rp. 35,000.00 = Rp. 7,000.00

Jumlah = Rp. 17,198.13

Dibulatkan = Rp. 17,198.00

PEKERJAAN BETON ( SNI DT 91-0008-2007 )

1. PEKERJAAN BETON RABAT 1:3:5 (SNI DT 91-0008-2007-01)

0.8700 Batu pecah 2-3 cm hitam a. Rp. 212,850.00 = Rp. 185,179.50

0.5200 Pasir cor a. Rp. 141,710.00 = Rp. 73,689.20

218.0000 kg Semen / PC a. Rp. 1,402.50 = Rp. 305,745.00

1.6500 Pekerja a. Rp. 35,000.00 = Rp. 57,750.00

0.0250 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 1,275.00

0.2500 Tukang batu a. Rp. 46,000.00 = Rp. 11,500.00

0.0800 Mandor a. Rp. 53,000.00 = Rp. 4,240.00

Jumlah = Rp. 639,378.70

Dibulatkan = Rp. 639,378.00

2. MEMBUAT LANTAI KERJA BETON 1:2:4 (SNI DT 91-0008-2007-02)

0.7607 Batu pecah 2-3 cm hitam a. Rp. 212,850.00 = Rp. 161,915.00

0.6379 Pasir cor a. Rp. 141,710.00 = Rp. 90,390.74

230.0000 kg Semen / PC a. Rp. 1,402.50 = Rp. 322,575.00

1.2000 Pekerja a. Rp. 35,000.00 = Rp. 42,000.00

0.0200 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 1,020.00

0.2000 Tukang batu a. Rp. 46,000.00 = Rp. 9,200.00

0.0600 Mandor a. Rp. 53,000.00 = Rp. 3,180.00

Jumlah = Rp. 630,280.73

Dibulatkan = Rp. 630,280.00

3. MEMBUAT BETON BERTULANG 1:2:3 K.100 (SNI DT 91-0008-2007-03)

0.7400 Batu pecah 2-3 cm hitam a. Rp. 212,850.00 = Rp. 157,509.00

0.6207 Pasir cor a. Rp. 141,710.00 = Rp. 87,959.40

247.0000 kg Semen / PC a. Rp. 1,402.50 = Rp. 346,417.50

1 M2

m3

1 M2

1 M2

m3

1 M2

1 M3

m3

m3

1 M3

m3

m3

1 M3

m3

m3

Page 19: Analis 2012 Gedung

19

1.6500 Pekerja a. Rp. 35,000.00 = Rp. 57,750.00

0.0280 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 1,428.00

0.2750 Tukang batu a. Rp. 46,000.00 = Rp. 12,650.00

0.0830 Mandor a. Rp. 53,000.00 = Rp. 4,399.00

Jumlah = Rp. 668,112.90

Dibulatkan = Rp. 668,112.00

4. MEMBUAT BETON BERTULANG 1:2:3 K.125 (SNI DT 91-0008-2007-04)

0.7496 Batu pecah 2-3 cm hitam a. Rp. 212,850.00 = Rp. 159,552.36

0.5914 Pasir cor a. Rp. 141,710.00 = Rp. 83,807.29

276.0000 kg Semen / PC a. Rp. 1,402.50 = Rp. 387,090.00

1.6500 Pekerja a. Rp. 35,000.00 = Rp. 57,750.00

0.0280 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 1,428.00

0.2750 Tukang batu a. Rp. 46,000.00 = Rp. 12,650.00

0.0830 Mandor a. Rp. 53,000.00 = Rp. 4,399.00

Jumlah = Rp. 706,676.65

Dibulatkan = Rp. 706,676.00

5. MEMBUAT BETON BERTULANG 1:2:3 K.150 (SNI DT 91-0008-2007-05)

0.7533 Batu pecah 2-3 cm hitam a. Rp. 212,850.00 = Rp. 160,346.29

0.5707 Pasir cor a. Rp. 141,710.00 = Rp. 80,873.90

299.0000 kg Semen / PC a. Rp. 1,402.50 = Rp. 419,347.50

1.6500 Pekerja a. Rp. 35,000.00 = Rp. 57,750.00

0.0280 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 1,428.00

0.2750 Tukang batu a. Rp. 46,000.00 = Rp. 12,650.00

0.0830 Mandor a. Rp. 53,000.00 = Rp. 4,399.00

Jumlah = Rp. 736,794.69

Dibulatkan = Rp. 736,794.00

6. MEMBUAT BETON BERTULANG 1:2:3 K.175 (SNI DT 91-0008-2007-06)

0.7622 Batu pecah 2-3 cm hitam a. Rp. 212,850.00 = Rp. 162,234.27

0.5428 Pasir cor a. Rp. 141,710.00 = Rp. 76,920.19

326.0000 kg Semen / PC a. Rp. 1,402.50 = Rp. 457,215.00

1.6500 Pekerja a. Rp. 35,000.00 = Rp. 57,750.00

0.0280 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 1,428.00

0.2750 Tukang batu a. Rp. 46,000.00 = Rp. 12,650.00

0.0830 Mandor a. Rp. 53,000.00 = Rp. 4,399.00

Jumlah = Rp. 772,596.46

Dibulatkan = Rp. 772,596.00

7. MEMBUAT BETON BERTULANG 1:2:3 K.200 (SNI DT 91-0008-2007-07)

0.7637 Batu pecah 2-3 cm hitam a. Rp. 212,850.00 = Rp. 162,553.55

0.5221 Pasir cor a. Rp. 141,710.00 = Rp. 73,986.79

352.0000 kg Semen / PC a. Rp. 1,402.50 = Rp. 493,680.00

1.6500 Pekerja a. Rp. 35,000.00 = Rp. 57,750.00

0.0280 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 1,428.00

0.2750 Tukang batu a. Rp. 46,000.00 = Rp. 12,650.00

0.0830 Mandor a. Rp. 53,000.00 = Rp. 4,399.00

Jumlah = Rp. 806,447.34

Dibulatkan = Rp. 806,447.00

8. MEMBUAT BETON BERTULANG 1:2:3 K.225 (SNI DT 91-0008-2007-08)

0.7756 Batu pecah 2-3 cm hitam a. Rp. 212,850.00 = Rp. 165,086.46

0.4986 Pasir cor a. Rp. 141,710.00 = Rp. 70,656.61

371.0000 kg Semen / PC a. Rp. 1,402.50 = Rp. 520,327.50

1.6500 Pekerja a. Rp. 35,000.00 = Rp. 57,750.00

0.0280 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 1,428.00

0.2750 Tukang batu a. Rp. 46,000.00 = Rp. 12,650.00

0.0830 Mandor a. Rp. 53,000.00 = Rp. 4,399.00

Jumlah = Rp. 832,297.57

Dibulatkan = Rp. 832,297.00

9. MEMBUAT BETON BERTULANG 1:2:3 K.250 (SNI DT 91-0008-2007-09)

0.7696 Batu pecah 2-3 cm hitam a. Rp. 212,850.00 = Rp. 163,809.36

0.4943 Pasir cor a. Rp. 141,710.00 = Rp. 70,047.25

384.0000 kg Semen / PC a. Rp. 1,402.50 = Rp. 538,560.00

1.6500 Pekerja a. Rp. 35,000.00 = Rp. 57,750.00

0.0280 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 1,428.00

1 M3

m3

m3

1 M3

m3

m3

1 M3

m3

m3

1 M3

m3

m3

1 M3

m3

m3

1 M3

m3

m3

Page 20: Analis 2012 Gedung

20

0.2750 Tukang batu a. Rp. 46,000.00 = Rp. 12,650.00

0.0830 Mandor a. Rp. 53,000.00 = Rp. 4,399.00

Jumlah = Rp. 848,643.61

Dibulatkan = Rp. 848,643.00

10. MEMBUAT BETON BERTULANG 1:2:3 K.275 (SNI DT 91-0008-2007-10)

0.7600 Batu pecah 2-3 cm hitam a. Rp. 212,850.00 = Rp. 161,766.00

0.4886 Pasir cor a. Rp. 141,710.00 = Rp. 69,239.51

406.0000 kg Semen / PC a. Rp. 1,402.50 = Rp. 569,415.00

1.6500 Pekerja a. Rp. 35,000.00 = Rp. 57,750.00

0.0280 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 1,428.00

0.2750 Tukang batu a. Rp. 46,000.00 = Rp. 12,650.00

0.0830 Mandor a. Rp. 53,000.00 = Rp. 4,399.00

Jumlah = Rp. 876,647.51

Dibulatkan = Rp. 876,647.00

11. MEMBUAT BETON BERTULANG 1:2:3 K.300 (SNI DT 91-0008-2007-11)

0.7563 Batu pecah 2-3 cm hitam a. Rp. 212,850.00 = Rp. 160,978.46

0.4864 Pasir cor a. Rp. 141,710.00 = Rp. 68,927.74

413.0000 kg Semen / PC a. Rp. 1,402.50 = Rp. 579,232.50

1.6500 Pekerja a. Rp. 35,000.00 = Rp. 57,750.00

0.0280 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 1,428.00

0.2750 Tukang batu a. Rp. 46,000.00 = Rp. 12,650.00

0.0830 Mandor a. Rp. 53,000.00 = Rp. 4,399.00

Jumlah = Rp. 885,365.70

Dibulatkan = Rp. 885,365.00

12. MEMBUAT BETON BERTULANG 1:2:3 K.325 (SNI DT 91-0008-2007-12)

0.7452 Batu pecah 2-3 cm hitam a. Rp. 212,850.00 = Rp. 158,615.82

0.4786 Pasir cor a. Rp. 141,710.00 = Rp. 67,822.41

439.0000 kg Semen / PC a. Rp. 1,402.50 = Rp. 615,697.50

1.6500 Pekerja a. Rp. 35,000.00 = Rp. 57,750.00

0.0280 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 1,428.00

0.2750 Tukang batu a. Rp. 46,000.00 = Rp. 12,650.00

0.0830 Mandor a. Rp. 53,000.00 = Rp. 4,399.00

Jumlah = Rp. 918,362.73

Dibulatkan = Rp. 918,362.00

13. MEMBUAT BETON BERTULANG 1:2:3 K.350 (SNI DT 91-0008-2007-13)

0.7407 Batu pecah 2-3 cm hitam a. Rp. 212,850.00 = Rp. 157,658.00

0.4764 Pasir cor a. Rp. 141,710.00 = Rp. 67,510.64

448.0000 kg Semen / PC a. Rp. 1,402.50 = Rp. 628,320.00

1.6500 Pekerja a. Rp. 35,000.00 = Rp. 57,750.00

0.0280 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 1,428.00

0.2750 Tukang batu a. Rp. 46,000.00 = Rp. 12,650.00

0.0830 Mandor a. Rp. 53,000.00 = Rp. 4,399.00

Jumlah = Rp. 929,715.64

Dibulatkan = Rp. 929,715.00

14. 1 M3 BEGESTING UNTUK PONDASI (SNI DT 91-0008-2007-14)

0.2000 Kayu terentang a. Rp. 3,593,333.33 = Rp. 718,666.67

1.5000 kg Paku a. Rp. 13,343.00 = Rp. 20,014.50

0.4000 ltr Minyak begesting a. Rp. 24,400.00 = Rp. 9,760.00

2.6000 Pekerja a. Rp. 35,000.00 = Rp. 91,000.00

1.3000 Tukang kayu a. Rp. 49,000.00 = Rp. 63,700.00

0.1300 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 6,630.00

0.1220 Mandor a. Rp. 53,000.00 = Rp. 6,466.00

Jumlah = Rp. 916,237.17

Dibulatkan = Rp. 916,237.00

15. 1 M3 BEGESTING UNTUK SLOOF (SNI DT 91-0008-2007-15)

0.2700 Kayu terentang a. Rp. 3,593,333.33 = Rp. 970,200.00

1.8000 kg Paku a. Rp. 13,343.00 = Rp. 24,017.40

0.6000 ltr Minyak begesting a. Rp. 24,400.00 = Rp. 14,640.00

2.6000 Pekerja a. Rp. 35,000.00 = Rp. 91,000.00

1.5600 Tukang kayu a. Rp. 49,000.00 = Rp. 76,440.00

0.1560 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 7,956.00

0.1200 Mandor a. Rp. 53,000.00 = Rp. 6,360.00

1 M3

m3

m3

1 M3

m3

m3

1 M3

m3

m3

1 M3

m3

m3

m3

m3

Page 21: Analis 2012 Gedung

21

Jumlah = Rp. 1,190,613.40

Dibulatkan = Rp. 1,190,613.00

16. 1 M3 BEGESTING UNTUK KOLOM (SNI DT 91-0008-2007-16)

0.3200 Kayu terentang a. Rp. 3,593,333.33 = Rp. 1,149,866.67

3.2000 kg Paku a. Rp. 13,343.00 = Rp. 42,697.60

1.6000 ltr Minyak begesting a. Rp. 24,400.00 = Rp. 39,040.00

0.1200 m3 Kayu Meranti 5/7 a. Rp. 3,593,333.33 = Rp. 431,200.00

2.8000 lbr Multipleks 9 mm a. Rp. 138,050.00 = Rp. 386,540.00

2.6000 Pekerja a. Rp. 35,000.00 = Rp. 91,000.00

1.3000 Tukang kayu a. Rp. 49,000.00 = Rp. 63,700.00

0.1320 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 6,732.00

0.1220 Mandor a. Rp. 53,000.00 = Rp. 6,466.00

Jumlah = Rp. 2,217,242.27

Dibulatkan = Rp. 2,217,242.00

17. 1 M3 BEGESTING UNTUK BALOK (SNI DT 91-0008-2007-17)

0.3200 Kayu terentang a. Rp. 3,593,333.33 = Rp. 1,149,866.67

3.2000 kg Paku a. Rp. 13,343.00 = Rp. 42,697.60

1.6000 ltr Minyak begesting a. Rp. 24,400.00 = Rp. 39,040.00

0.1400 m3 Kayu meranti 5/7 a. Rp. 3,593,333.33 = Rp. 503,066.67

2.8000 lbr Multipleks 9 mm a. Rp. 138,050.00 = Rp. 386,540.00

16.0000 btg a. Rp. 35,000.00 = Rp. 560,000.00

3.3000 Pekerja a. Rp. 35,000.00 = Rp. 115,500.00

1.6500 Tukang kayu a. Rp. 49,000.00 = Rp. 80,850.00

0.1650 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 8,415.00

0.1550 Mandor a. Rp. 53,000.00 = Rp. 8,215.00

Jumlah = Rp. 2,894,190.93

Dibulatkan = Rp. 2,894,190.00

18. 1 M3 BEGESTING UNTUK LANTAI (SNI DT 91-0008-2007-18)

0.3200 Kayu terentang a. Rp. 3,593,333.33 = Rp. 1,149,866.67

3.2000 kg Paku a. Rp. 13,343.00 = Rp. 42,697.60

1.6000 ltr Minyak begesting a. Rp. 24,400.00 = Rp. 39,040.00

0.1200 m3 Kayu meranti 5/7 a. Rp. 3,593,333.33 = Rp. 431,200.00

2.8000 lbr Multipleks 9 mm a. Rp. 138,050.00 = Rp. 386,540.00

25.0000 btg a. Rp. 35,000.00 = Rp. 875,000.00

3.3000 Pekerja a. Rp. 35,000.00 = Rp. 115,500.00

1.6500 Tukang kayu a. Rp. 49,000.00 = Rp. 80,850.00

0.1650 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 8,415.00

0.1550 Mandor a. Rp. 53,000.00 = Rp. 8,215.00

Jumlah = Rp. 3,137,324.27

Dibulatkan = Rp. 3,137,324.00

19. BEGESTING UNTUK TANGGA (SNI DT 91-0008-2007-19)

0.2500 Kayu terentang a. Rp. 3,593,333.33 = Rp. 898,333.33

3.0000 kg Paku a. Rp. 13,343.00 = Rp. 40,029.00

1.2000 ltr Minyak begesting a. Rp. 24,400.00 = Rp. 29,280.00

0.1050 m3 Kayu meranti 5/7 a. Rp. 3,593,333.33 = Rp. 377,300.00

2.5000 lbr Multipleks 9 mm a. Rp. 138,050.00 = Rp. 345,125.00

14.0000 btg a. Rp. 35,000.00 = Rp. 490,000.00

3.3000 Pekerja a. Rp. 35,000.00 = Rp. 115,500.00

1.6500 Tukang kayu a. Rp. 49,000.00 = Rp. 80,850.00

0.1650 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 8,415.00

0.1550 Mandor a. Rp. 53,000.00 = Rp. 8,215.00

Jumlah = Rp. 2,393,047.33

Dibulatkan = Rp. 2,393,047.00

20. 10 Kg PEMBESIAN DENGAN BESI POLOS (SNI DT 91-0008-2007-20)

10.5000 kg Besi beton polos a. Rp. 9,900.00 = Rp. 103,950.00

0.1500 kg Kawat bendrat a. Rp. 19,030.00 = Rp. 2,854.50

0.0700 Pekerja a. Rp. 35,000.00 = Rp. 2,450.00

0.0700 Tukang besi a. Rp. 47,000.00 = Rp. 3,290.00

0.0070 Kep. Tukang besi a. Rp. 51,000.00 = Rp. 357.00

0.0040 Mandor a. Rp. 53,000.00 = Rp. 212.00

Jumlah = Rp. 113,113.50

Dibulatkan = Rp. 113,113.00

m3

m3

Dolken kayu f 8 / 400 cm

m3

Dolken kayu f 8 / 400 cm

1 M2

m3

Dolken kayu f 8 / 400 cm

Page 22: Analis 2012 Gedung

22

21. 10 Kg PEMBESIAN DENGAN BESI ULIR (SNI DT 91-0008-2007-21)

10.5000 kg Besi beton ulir a. Rp. 10,560.00 = Rp. 110,880.00

0.1500 kg Kawat bendrat a. Rp. 19,030.00 = Rp. 2,854.50

0.0700 Pekerja a. Rp. 35,000.00 = Rp. 2,450.00

0.0700 Tukang besi a. Rp. 47,000.00 = Rp. 3,290.00

0.0070 Kep. Tukang besi a. Rp. 51,000.00 = Rp. 357.00

0.0040 Mandor a. Rp. 53,000.00 = Rp. 212.00

Jumlah = Rp. 120,043.50

Dibulatkan = Rp. 120,043.00

22. 110 Kg PEMBESIAN DENGAN BESI POLOS (SNI DT 91-0008-2007-22)

115.5000 kg Besi beton polos a. Rp. 9,900.00 = Rp. 1,143,450.00

1.6500 kg Kawat bendrat a. Rp. 19,030.00 = Rp. 31,399.50

0.7700 Pekerja a. Rp. 35,000.00 = Rp. 26,950.00

0.7700 Tukang besi a. Rp. 47,000.00 = Rp. 36,190.00

0.0770 Kep. Tukang besi a. Rp. 51,000.00 = Rp. 3,927.00

0.0440 Mandor a. Rp. 53,000.00 = Rp. 2,332.00

Jumlah = Rp. 1,244,248.50

Dibulatkan = Rp. 1,244,248.00

23. 120 Kg PEMBESIAN DENGAN BESI POLOS (SNI DT 91-0008-2007-23)

126.0000 kg Besi beton polos a. Rp. 9,900.00 = Rp. 1,247,400.00

1.8000 kg Kawat bendrat a. Rp. 19,030.00 = Rp. 34,254.00

0.8400 Pekerja a. Rp. 35,000.00 = Rp. 29,400.00

0.8400 Tukang besi a. Rp. 47,000.00 = Rp. 39,480.00

0.0840 Kep. Tukang besi a. Rp. 51,000.00 = Rp. 4,284.00

0.0480 Mandor a. Rp. 53,000.00 = Rp. 2,544.00

Jumlah = Rp. 1,357,362.00

Dibulatkan = Rp. 1,357,362.00

24. 130 Kg PEMBESIAN DENGAN BESI POLOS (SNI DT 91-0008-2007-24)

136.5000 kg Besi beton polos a. Rp. 9,900.00 = Rp. 1,351,350.00

1.9500 kg Kawat bendrat a. Rp. 19,030.00 = Rp. 37,108.50

0.9100 Pekerja a. Rp. 35,000.00 = Rp. 31,850.00

0.9100 Tukang besi a. Rp. 47,000.00 = Rp. 42,770.00

0.0910 Kep. Tukang besi a. Rp. 51,000.00 = Rp. 4,641.00

0.0520 Mandor a. Rp. 53,000.00 = Rp. 2,756.00

Jumlah = Rp. 1,470,475.50

Dibulatkan = Rp. 1,470,475.00

25. 140 Kg PEMBESIAN DENGAN BESI POLOS (SNI DT 91-0008-2007-25)

147.0000 kg Besi beton polos a. Rp. 9,900.00 = Rp. 1,455,300.00

2.1000 kg Kawat bendrat a. Rp. 19,030.00 = Rp. 39,963.00

0.9800 Pekerja a. Rp. 35,000.00 = Rp. 34,300.00

0.9800 Tukang besi a. Rp. 47,000.00 = Rp. 46,060.00

0.0980 Kep. Tukang besi a. Rp. 51,000.00 = Rp. 4,998.00

0.0560 Mandor a. Rp. 53,000.00 = Rp. 2,968.00

Jumlah = Rp. 1,583,589.00

Dibulatkan = Rp. 1,583,589.00

26. 150 Kg PEMBESIAN DENGAN BESI POLOS (SNI DT 91-0008-2007-26)

157.5000 kg Besi beton polos a. Rp. 9,900.00 = Rp. 1,559,250.00

2.2500 kg Kawat bendrat a. Rp. 19,030.00 = Rp. 42,817.50

1.0500 Pekerja a. Rp. 35,000.00 = Rp. 36,750.00

1.0500 Tukang besi a. Rp. 47,000.00 = Rp. 49,350.00

0.1050 Kep. Tukang besi a. Rp. 51,000.00 = Rp. 5,355.00

0.0600 Mandor a. Rp. 53,000.00 = Rp. 3,180.00

Jumlah = Rp. 1,696,702.50

Dibulatkan = Rp. 1,696,702.00

27. 200 Kg PEMBESIAN DENGAN BESI POLOS (SNI DT 91-0008-2007-27)

210.0000 kg Besi beton polos a. Rp. 9,900.00 = Rp. 2,079,000.00

3.0000 kg Kawat bendrat a. Rp. 19,030.00 = Rp. 57,090.00

1.4000 Pekerja a. Rp. 35,000.00 = Rp. 49,000.00

1.4000 Tukang besi a. Rp. 47,000.00 = Rp. 65,800.00

0.1400 Kep. Tukang besi a. Rp. 51,000.00 = Rp. 7,140.00

0.0800 Mandor a. Rp. 53,000.00 = Rp. 4,240.00

Jumlah = Rp. 2,262,270.00

Page 23: Analis 2012 Gedung

23

Dibulatkan = Rp. 2,262,270.00

28. 250 Kg PEMBESIAN DENGAN BESI POLOS (SNI DT 91-0008-2007-28)

262.5000 kg Besi beton polos a. Rp. 9,900.00 = Rp. 2,598,750.00

3.7500 kg Kawat bendrat a. Rp. 19,030.00 = Rp. 71,362.50

1.7500 Pekerja a. Rp. 35,000.00 = Rp. 61,250.00

1.7500 Tukang besi a. Rp. 47,000.00 = Rp. 82,250.00

0.1750 Kep. Tukang besi a. Rp. 51,000.00 = Rp. 8,925.00

0.1000 Mandor a. Rp. 53,000.00 = Rp. 5,300.00

Jumlah = Rp. 2,827,837.50

Dibulatkan = Rp. 2,827,837.00

29. MEMBUAT PONDASI BETON BERTULANG K.175 (SNI DT 91-0008-2007-29)

1.00 BETON BERTULANG 1:2:3 K.175 a. Rp. 772,596.00 = Rp. 772,596.00

1.00 BEGESTING PONDASI a. Rp. 916,237.00 = Rp. 916,237.00

1.00 PEMBESIAN 120 KG a. Rp. 1,357,362.00 = Rp. 1,357,362.00

Jumlah = Rp. 3,046,195.00

Dibulatkan = Rp. 3,046,195.00

30. MEMBUAT PONDASI BETON BERTULANG K.200 (SNI DT 91-0008-2007-30)

1.00 BETON BERTULANG 1:2:3 K.200 a. Rp. 806,447.00 = Rp. 806,447.00

1.00 BEGESTING PONDASI a. Rp. 916,237.00 = Rp. 916,237.00

1.00 PEMBESIAN 120 KG a. Rp. 1,357,362.00 = Rp. 1,357,362.00

Jumlah = Rp. 3,080,046.00

Dibulatkan = Rp. 3,080,046.00

31. MEMBUAT PONDASI BETON BERTULANG K.225 (SNI DT 91-0008-2007-31)

1.00 BETON BERTULANG 1:2:3 K.225 a. Rp. 832,297.00 = Rp. 832,297.00

1.00 BEGESTING PONDASI a. Rp. 916,237.00 = Rp. 916,237.00

1.00 PEMBESIAN 120 KG a. Rp. 1,357,362.00 = Rp. 1,357,362.00

Jumlah = Rp. 3,105,896.00

Dibulatkan = Rp. 3,105,896.00

32. MEMBUAT PONDASI BETON BERTULANG K.250 (SNI DT 91-0008-2007-32)

1.00 BETON BERTULANG 1:2:3 K.250 a. Rp. 848,643.00 = Rp. 848,643.00

1.00 BEGESTING PONDASI a. Rp. 916,237.00 = Rp. 916,237.00

1.00 PEMBESIAN 120 KG a. Rp. 1,357,362.00 = Rp. 1,357,362.00

Jumlah = Rp. 3,122,242.00

Dibulatkan = Rp. 3,122,242.00

33. MEMBUAT SLOOF BETON BERTULANG K.200 UK. 15/15, 15/20 (SNI DT 91-0008-2007-33)

1.00 BETON BERTULANG 1:2:3 K.200 a. Rp. 806,447.00 = Rp. 806,447.00

1.00 BEGESTING SLOOF a. Rp. 1,190,613.00 = Rp. 1,190,613.00

1.00 PEMBESIAN 130 KG a. Rp. 1,470,475.00 = Rp. 1,470,475.00

Jumlah = Rp. 3,467,535.00

Dibulatkan = Rp. 3,467,535.00

34. MEMBUAT SLOOF BETON BERTULANG K.225 UK. 20/25, 20/30 (SNI DT 91-0008-2007-34)

1.00 BETON BERTULANG 1:2:3 K.225 a. Rp. 832,297.00 = Rp. 832,297.00

1.00 BEGESTING SLOOF a. Rp. 1,190,613.00 = Rp. 1,190,613.00

1.00 PEMBESIAN 140 KG a. Rp. 1,583,589.00 = Rp. 1,583,589.00

Jumlah = Rp. 3,606,499.00

Dibulatkan = Rp. 3,606,499.00

35. MEMBUAT SLOOF BETON BERTULANG K.225 UK. 20/40, 30/40 (SNI DT 91-0008-2007-35)

1.00 BETON BERTULANG 1:2:3 K.225 a. Rp. 832,297.00 = Rp. 832,297.00

1.00 BEGESTING SLOOF a. Rp. 1,190,613.00 = Rp. 1,190,613.00

1.00 PEMBESIAN 150 KG a. Rp. 1,696,702.00 = Rp. 1,696,702.00

Jumlah = Rp. 3,719,612.00

Dibulatkan = Rp. 3,719,612.00

36. MEMBUAT SLOOF BETON BERTULANG K.250 UK. 20/25, 20/30 (SNI DT 91-0008-2007-36)

1.00 BETON BERTULANG 1:2:3 K.250 a. Rp. 848,643.00 = Rp. 848,643.00

1.00 BEGESTING SLOOF a. Rp. 1,190,613.00 = Rp. 1,190,613.00

1.00 PEMBESIAN 140 KG a. Rp. 1,583,589.00 = Rp. 1,583,589.00

Jumlah = Rp. 3,622,845.00

Dibulatkan = Rp. 3,622,845.00

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

Page 24: Analis 2012 Gedung

24

37. MEMBUAT SLOOF BETON BERTULANG K.250 UK. 20/40, 30/40 (SNI DT 91-0008-2007-37)

1.00 BETON BERTULANG 1:2:3 K.250 a. Rp. 848,643.00 = Rp. 848,643.00

1.00 BEGESTING SLOOF a. Rp. 1,190,613.00 = Rp. 1,190,613.00

1.00 PEMBESIAN 150 KG a. Rp. 1,696,702.00 = Rp. 1,696,702.00

Jumlah = Rp. 3,735,958.00

Dibulatkan = Rp. 3,735,958.00

38. MEMBUAT KOLOM PRAKTIS BTN BERTULANG K.175 UK. 11/11,15/15 (SNI DT 91-0008-2007-38)

1.00 BETON BERTULANG 1:2:3 K.175 a. Rp. 772,596.00 = Rp. 772,596.00

0.25 BEGESTING KOLOM a. Rp. 2,217,242.00 = Rp. 554,310.50

1.00 PEMBESIAN 130 KG a. Rp. 1,470,475.00 = Rp. 1,470,475.00

Jumlah = Rp. 2,797,381.50

Dibulatkan = Rp. 2,797,381.00

39. MEMBUAT KOLOM BETON BERTULANG K.200 UK. 15/25, 15/30, 20/30 (SNI DT 91-0008-2007-39)

1.00 BETON BERTULANG 1:2:3 K.200 a. Rp. 806,447.00 = Rp. 806,447.00

0.5 BEGESTING KOLOM a. Rp. 2,217,242.00 = Rp. 1,108,621.00

1.00 PEMBESIAN 150 KG a. Rp. 1,696,702.00 = Rp. 1,696,702.00

Jumlah = Rp. 3,611,770.00

Dibulatkan = Rp. 3,611,770.00

40. MEMBUAT KOLOM BETON BERTULANG K.225 UK. 15/25, 15/30, 20/30 (SNI DT 91-0008-2007-40)

1.00 BETON BERTULANG 1:2:3 K.225 a. Rp. 832,297.00 = Rp. 832,297.00

0.5 BEGESTING KOLOM a. Rp. 2,217,242.00 = Rp. 1,108,621.00

1.00 PEMBESIAN 150 KG a. Rp. 1,696,702.00 = Rp. 1,696,702.00

Jumlah = Rp. 3,637,620.00

Dibulatkan = Rp. 3,637,620.00

41. MEMBUAT KOLOM BETON BERTULANG K.225 UK. 20/40, 30/40 (SNI DT 91-0008-2007-41)

1.00 BETON BERTULANG 1:2:3 K.225 a. Rp. 832,297.00 = Rp. 832,297.00

0.5 BEGESTING KOLOM a. Rp. 2,217,242.00 = Rp. 1,108,621.00

1.00 PEMBESIAN 200 KG a. Rp. 2,262,270.00 = Rp. 2,262,270.00

Jumlah = Rp. 4,203,188.00

Dibulatkan = Rp. 4,203,188.00

42. MEMBUAT KOLOM BETON BERTULANG K.250 UK. 20/40, 30/40 (SNI DT 91-0008-2007-42)

1.00 BETON BERTULANG 1:2:3 K.250 a. Rp. 848,643.00 = Rp. 848,643.00

0.5 BEGESTING KOLOM a. Rp. 2,217,242.00 = Rp. 1,108,621.00

1.00 PEMBESIAN 200 KG a. Rp. 2,262,270.00 = Rp. 2,262,270.00

Jumlah = Rp. 4,219,534.00

Dibulatkan = Rp. 4,219,534.00

43. MEMBUAT KOLOM BETON BERTULANG K.225 UK. 30/50, 35/50 (SNI DT 91-0008-2007-43)

1.00 BETON BERTULANG 1:2:3 K.225 a. Rp. 832,297.00 = Rp. 832,297.00

0.50 BEGESTING KOLOM a. Rp. 2,217,242.00 = Rp. 1,108,621.00

1.00 PEMBESIAN 225 KG a. Rp. 2,522,145.00 = Rp. 2,522,145.00

Jumlah = Rp. 4,463,063.00

Dibulatkan = Rp. 4,463,063.00

44. MEMBUAT KOLOM BETON BERTULANG K.250 UK. 30/50, 35/50 (SNI DT 91-0008-2007-44)

1.00 BETON BERTULANG 1:2:3 K.250 a. Rp. 848,643.00 = Rp. 848,643.00

0.50 BEGESTING KOLOM a. Rp. 2,217,242.00 = Rp. 1,108,621.00

1.00 PEMBESIAN 225 KG a. Rp. 2,522,145.00 = Rp. 2,522,145.00

Jumlah = Rp. 4,479,409.00

Dibulatkan = Rp. 4,479,409.00

45. MEMBUAT KOLOM BETON BERTULANG K.225 UK. 30/60, 35/60, 40/70 (SNI DT 91-0008-2007-45)

1.00 BETON BERTULANG 1:2:3 K.225 a. Rp. 832,297.00 = Rp. 832,297.00

0.5 BEGESTING KOLOM a. Rp. 2,217,242.00 = Rp. 1,108,621.00

1.00 PEMBESIAN 250 KG a. Rp. 2,827,837.00 = Rp. 2,827,837.00

Jumlah = Rp. 4,768,755.00

Dibulatkan = Rp. 4,768,755.00

46. MEMBUAT KOLOM BETON BERTULANG K.250 UK. 30/60, 35/60, 40/70 (SNI DT 91-0008-2007-46)

1.00 BETON BERTULANG 1:2:3 K.250 a. Rp. 848,643.00 = Rp. 848,643.00

0.50 BEGESTING KOLOM a. Rp. 2,217,242.00 = Rp. 1,108,621.00

1.00 PEMBESIAN 250 KG a. Rp. 2,827,837.00 = Rp. 2,827,837.00

Jumlah = Rp. 4,785,101.00

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

Page 25: Analis 2012 Gedung

25

Dibulatkan = Rp. 4,785,101.00

47. MEMBUAT RING BALOK BETON BERTULANG K.175 UK. 15/15, 15/20 (SNI DT 91-0008-2007-47)

1.00 BETON BERTULANG 1:2:3 K.175 a. Rp. 772,596.00 = Rp. 772,596.00

0.25 BEGESTING BALOK a. Rp. 2,894,190.00 = Rp. 723,547.50

1.00 PEMBESIAN 110 KG a. Rp. 1,244,248.00 = Rp. 1,244,248.00

Jumlah = Rp. 2,740,391.50

Dibulatkan = Rp. 2,740,391.00

48. MEMBUAT BALOK BETON BERTULANG K.200 UK. 15/20, 15/30, 20/30 (SNI DT 91-0008-2007-48)

1.00 BETON BERTULANG 1:2:3 K.200 a. Rp. 806,447.00 = Rp. 806,447.00

0.50 BEGESTING BALOK a. Rp. 2,894,190.00 = Rp. 1,447,095.00

1.00 PEMBESIAN 120 KG a. Rp. 1,357,362.00 = Rp. 1,357,362.00

Jumlah = Rp. 3,610,904.00

Dibulatkan = Rp. 3,610,904.00

49. MEMBUAT BALOK BETON BERTULANG K.225 UK. 15/30, 20/30 (SNI DT 91-0008-2007-49)

1.00 BETON BERTULANG 1:2:3 K.225 a. Rp. 832,297.00 = Rp. 832,297.00

0.50 BEGESTING BALOK a. Rp. 2,894,190.00 = Rp. 1,447,095.00

1.00 PEMBESIAN 120 KG a. Rp. 1,357,362.00 = Rp. 1,357,362.00

Jumlah = Rp. 3,636,754.00

Dibulatkan = Rp. 3,636,754.00

50. MEMBUAT BALOK BETON BERTULANG K.225 UK. 25/40, 30/50 (SNI DT 91-0008-2007-50)

1.00 BETON BERTULANG 1:2:3 K.225 a. Rp. 832,297.00 = Rp. 832,297.00

0.50 BEGESTING BALOK a. Rp. 2,894,190.00 = Rp. 1,447,095.00

1.00 PEMBESIAN 150 KG a. Rp. 1,696,702.00 = Rp. 1,696,702.00

Jumlah = Rp. 3,976,094.00

Dibulatkan = Rp. 3,976,094.00

51. MEMBUAT BALOK BETON BERTULANG K.250 UK. 25/40, 30/50 (SNI DT 91-0008-2007-51)

1.00 BETON BERTULANG 1:2:3 K.250 a. Rp. 848,643.00 = Rp. 848,643.00

0.50 BEGESTING BALOK a. Rp. 2,894,190.00 = Rp. 1,447,095.00

1.00 PEMBESIAN 150 KG a. Rp. 1,696,702.00 = Rp. 1,696,702.00

Jumlah = Rp. 3,992,440.00

Dibulatkan = Rp. 3,992,440.00

52. MEMBUAT BALOK BETON BERTULANG K.225 UK. 30/60, 30/70, 30/80 (SNI DT 91-0008-2007-52)

1.00 BETON BERTULANG 1:2:3 K.225 a. Rp. 832,297.00 = Rp. 832,297.00

0.50 BEGESTING BALOK a. Rp. 2,894,190.00 = Rp. 1,447,095.00

1.00 PEMBESIAN 200 KG a. Rp. 2,262,270.00 = Rp. 2,262,270.00

Jumlah = Rp. 4,541,662.00

Dibulatkan = Rp. 4,541,662.00

53. MEMBUAT BALOK BETON BERTULANG K.250 UK. 30/60, 30/70, 30/80 (SNI DT 91-0008-2007-53)

1.00 BETON BERTULANG 1:2:3 K.250 a. Rp. 848,643.00 = Rp. 848,643.00

0.50 BEGESTING BALOK a. Rp. 2,894,190.00 = Rp. 1,447,095.00

1.00 PEMBESIAN 200 KG a. Rp. 2,262,270.00 = Rp. 2,262,270.00

Jumlah = Rp. 4,558,008.00

Dibulatkan = Rp. 4,558,008.00

54. MEMBUAT PLAT LANTAI BETON BERTULANG K.225 TB. 10 & 12 CM (SNI DT 91-0008-2007-54)

1.00 BETON BERTULANG 1:2:3 K.225 a. Rp. 832,297.00 = Rp. 832,297.00

0.50 BEGESTING LANTAI a. Rp. 3,137,324.00 = Rp. 1,568,662.00

1.00 PEMBESIAN 110 KG a. Rp. 1,244,248.00 = Rp. 1,244,248.00

Jumlah = Rp. 3,645,207.00

Dibulatkan = Rp. 3,645,207.00

55. MEMBUAT PLAT LANTAI BETON BERTULANG K.250 TB. 10 & 12 CM (SNI DT 91-0008-2007-55)

1.00 BETON BERTULANG 1:2:3 K.250 a. Rp. 848,643.00 = Rp. 848,643.00

0.50 BEGESTING LANTAI a. Rp. 3,137,324.00 = Rp. 1,568,662.00

1.00 PEMBESIAN 110 KG a. Rp. 1,244,248.00 = Rp. 1,244,248.00

Jumlah = Rp. 3,661,553.00

Dibulatkan = Rp. 3,661,553.00

56. MEMBUAT TANGGA BETON BERTULANG K.225 (SNI DT 91-0008-2007-56)

1.00 BETON BERTULANG 1:2:3 K.225 a. Rp. 832,297.00 = Rp. 832,297.00

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

Page 26: Analis 2012 Gedung

26

0.50 BEGESTING TANGGA a. Rp. 2,393,047.00 = Rp. 1,196,523.50

1.00 PEMBESIAN 150 KG a. Rp. 1,696,702.00 = Rp. 1,696,702.00

Jumlah = Rp. 3,725,522.50

Dibulatkan = Rp. 3,725,522.00

57. MEMBUAT TANGGA BETON BERTULANG K.250 (SNI DT 91-0008-2007-57)

1.00 BETON BERTULANG 1:2:3 K.250 a. Rp. 848,643.00 = Rp. 848,643.00

0.50 BEGESTING TANGGA a. Rp. 2,393,047.00 = Rp. 1,196,523.50

1.00 PEMBESIAN 150 KG a. Rp. 1,696,702.00 = Rp. 1,696,702.00

Jumlah = Rp. 3,741,868.50

Dibulatkan = Rp. 3,741,868.00

58. 225 Kg PEMBESIAN DENGAN BESI POLOS (SNI DT 91-0008-2007-58)

236.2500 kg Besi beton polos a. Rp. 9,900.00 = Rp. 2,338,875.00

3.0000 kg Kawat bendrat a. Rp. 19,030.00 = Rp. 57,090.00

1.4000 Pekerja a. Rp. 35,000.00 = Rp. 49,000.00

1.4000 Tukang besi a. Rp. 47,000.00 = Rp. 65,800.00

0.1400 Kep. Tukang besi a. Rp. 51,000.00 = Rp. 7,140.00

0.0800 Mandor a. Rp. 53,000.00 = Rp. 4,240.00

Jumlah = Rp. 2,522,145.00

Dibulatkan = Rp. 2,522,145.00

59 1 M3 BEGESTING UNTUK PONDASI (SNI DT 91-0008-2007-59)

0.0054 Kayu terentang a. Rp. 3,593,333.33 = Rp. 19,404.00

1.5000 kg Paku a. Rp. 13,343.00 = Rp. 20,014.50

0.4000 ltr Minyak begesting a. Rp. 24,400.00 = Rp. 9,760.00

2.6000 Pekerja a. Rp. 35,000.00 = Rp. 91,000.00

1.3000 Tukang kayu a. Rp. 49,000.00 = Rp. 63,700.00

0.1300 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 6,630.00

0.1220 Mandor a. Rp. 53,000.00 = Rp. 6,466.00

Jumlah = Rp. 216,974.50

Dibulatkan = Rp. 216,974.00

60 43 Kg PEMBESIAN DENGAN BESI POLOS (SNI DT 91-0008-2007-60)

45.1500 kg Besi beton polos a. Rp. 9,900.00 = Rp. 446,985.00

0.6450 kg Kawat bendrat a. Rp. 19,030.00 = Rp. 12,274.35

0.3010 Pekerja a. Rp. 35,000.00 = Rp. 10,535.00

0.3010 Tukang besi a. Rp. 47,000.00 = Rp. 14,147.00

0.0301 Kep. Tukang besi a. Rp. 51,000.00 = Rp. 1,535.10

0.0172 Mandor a. Rp. 53,000.00 = Rp. 911.60

Jumlah = Rp. 486,388.05

Dibulatkan = Rp. 486,388.00

61 MEMBUAT PLAT LANTAI DIBAWAH BETON BERTULANG K.175 (SNI DT 91-0008-2007-61)

1.00 BETON BERTULANG 1:2:3 K.175 a. Rp. 772,596.00 = Rp. 772,596.00

0.50 BEGESTING PONDASI a. Rp. 216,974.00 = Rp. 108,487.00

1.00 PEMBESIAN 43 KG a. Rp. 486,388.00 = Rp. 486,388.00

Jumlah = Rp. 1,367,471.00

Dibulatkan = Rp. 1,367,471.00

62 61 Kg PEMBESIAN DENGAN BESI POLOS (SNI DT 91-0008-2007-62)

64.0500 kg Besi beton polos a. Rp. 9,900.00 = Rp. 634,095.00

0.6450 kg Kawat bendrat a. Rp. 19,030.00 = Rp. 12,274.35

0.3010 Pekerja a. Rp. 35,000.00 = Rp. 10,535.00

0.3010 Tukang besi a. Rp. 47,000.00 = Rp. 14,147.00

0.0301 Kep. Tukang besi a. Rp. 51,000.00 = Rp. 1,535.10

0.0172 Mandor a. Rp. 53,000.00 = Rp. 911.60

Jumlah = Rp. 673,498.05

Dibulatkan = Rp. 673,498.00

63 MEMBUAT PLAT LANTAI DIBAWAH BETON BERTULANG K.175 (SNI DT 91-0008-2007-63)

1.00 BETON BERTULANG 1:2:3 K.175 a. Rp. 772,596.00 = Rp. 772,596.00

0.50 BEGESTING PONDASI a. Rp. 216,974.00 = Rp. 108,487.00

1.00 PEMBESIAN 61 KG a. Rp. 673,498.00 = Rp. 673,498.00

Jumlah = Rp. 1,554,581.00

Dibulatkan = Rp. 1,554,581.00

PEKERJAAN KAYU ( SNI DT 91-0011-2007 )

1 M3

m3

1 M3

1 M3

Page 27: Analis 2012 Gedung

27

BAHAN KAYU MERANTI

1. PASANGAN KUDA - KUDA (SNI DT 91-0011-2007-01)

1.1000 Kayu balok meranti kw. II a. Rp. 4,418,333.33 = Rp. 4,860,166.66

15.0000 kg Besi strip a. Rp. 14,500.00 = Rp. 217,500.00

5.6000 kg Paku a. Rp. 13,343.00 = Rp. 74,720.80

4.0000 Pekerja a. Rp. 35,000.00 = Rp. 140,000.00

12.0000 Tukang kayu a. Rp. 49,000.00 = Rp. 588,000.00

1.2000 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 61,200.00

0.2000 Mandor a. Rp. 53,000.00 = Rp. 10,600.00

Jumlah = Rp. 5,952,187.46

Dibulatkan = Rp. 5,952,187.00

2. PASANGAN GORDENG (SNI DT 91-0011-2007-02)

1.1000 Kayu balok bengkirai kw. II a. Rp. 4,418,333.33 = Rp. 4,860,166.66

15.0000 kg Besi strip a. Rp. 14,500.00 = Rp. 217,500.00

3.0000 kg Paku a. Rp. 13,343.00 = Rp. 40,029.00

2.4000 Pekerja a. Rp. 35,000.00 = Rp. 84,000.00

7.2000 Tukang kayu a. Rp. 49,000.00 = Rp. 352,800.00

0.7200 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 36,720.00

0.1200 Mandor a. Rp. 53,000.00 = Rp. 6,360.00

Jumlah = Rp. 5,597,575.66

Dibulatkan = Rp. 5,597,575.00

3. (SNI DT 91-0011-2007-03)

0.0120 Kayu meranti 5/7 a. Rp. 3,593,333.33 = Rp. 43,120.00

0.0036 Reng Meranti a. Rp. 3,031,875.00 = Rp. 10,914.75

0.1500 kg Paku usuk a. Rp. 13,343.00 = Rp. 2,001.45

0.1000 Pekerja a. Rp. 35,000.00 = Rp. 3,500.00

0.1000 Tukang kayu a. Rp. 49,000.00 = Rp. 4,900.00

0.0100 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 510.00

0.0050 Mandor a. Rp. 53,000.00 = Rp. 265.00

Jumlah = Rp. 65,211.20

Dibulatkan = Rp. 65,211.00

4. PASANGAN USUK/RENG UNTUK GENTENG BETON DAN MONIER (SNI DT 91-0011-2007-04)

0.0120 Kayu meranti 5/7 a. Rp. 3,593,333.33 = Rp. 43,120.00

0.0057 Reng Meranti a. Rp. 3,031,875.00 = Rp. 17,281.69

0.2500 kg Paku usuk a. Rp. 13,343.00 = Rp. 3,335.75

0.1000 Pekerja a. Rp. 35,000.00 = Rp. 3,500.00

0.1000 Tukang kayu a. Rp. 49,000.00 = Rp. 4,900.00

0.0100 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 510.00

0.0050 Mandor a. Rp. 53,000.00 = Rp. 265.00

Jumlah = Rp. 72,912.44

Dibulatkan = Rp. 72,912.00

5. PAS. RANGKA PLAFOND (50X100) Cm KAYU MERANTI (SNI DT 91-0011-2007-05)

0.0154 Kayu meranti 5/7 a. Rp. 3,593,333.33 = Rp. 55,337.33

0.2000 kg Paku usuk a. Rp. 13,343.00 = Rp. 2,668.60

0.1500 Pekerja a. Rp. 35,000.00 = Rp. 5,250.00

0.2500 Tukang kayu a. Rp. 49,000.00 = Rp. 12,250.00

0.0250 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 1,275.00

0.0750 Mandor a. Rp. 53,000.00 = Rp. 3,975.00

Jumlah = Rp. 80,755.93

Dibulatkan = Rp. 80,755.00

6. PAS. RANGKA PLAFOND (60X120) Cm KAYU MERANTI (SNI DT 91-0011-2007-06)

0.0142 Kayu meranti 5/7 a. Rp. 3,593,333.33 = Rp. 51,025.33

0.2500 kg Paku usuk a. Rp. 13,343.00 = Rp. 3,335.75

0.2000 Pekerja a. Rp. 35,000.00 = Rp. 7,000.00

0.3000 Tukang kayu a. Rp. 49,000.00 = Rp. 14,700.00

0.0300 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 1,530.00

0.0100 Mandor a. Rp. 53,000.00 = Rp. 530.00

Jumlah = Rp. 78,121.08

Dibulatkan = Rp. 78,121.00

7. PASANGAN KUSEN KAYU MERANTI (SNI DT 91-0011-2007-07)

1 M3

m3

1 M3

m3

1 M2 PASANGAN USUK DAN RENG GENTENG PRES/LOKAL

m3

m3

1 M2

m3

m3

1 M2

m3

1 M2

m3

1 M3

Page 28: Analis 2012 Gedung

28

1.2000 Kayu balok meranti kw. 1 a. Rp. 4,739,166.67 = Rp. 5,687,000.00

1.2500 kg Paku a. Rp. 13,343.00 = Rp. 16,678.75

1.0000 kg Lem Kayu a. Rp. 17,500.00 = Rp. 17,500.00

6.0000 Pekerja a. Rp. 35,000.00 = Rp. 210,000.00

18.0000 Tukang kayu a. Rp. 49,000.00 = Rp. 882,000.00

2.0000 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 102,000.00

0.3000 Mandor a. Rp. 53,000.00 = Rp. 15,900.00

Jumlah = Rp. 6,931,078.75

Dibulatkan = Rp. 6,931,078.00

8. PAS. DAUN PINTU / JENDELA KACA POLOS (SNI DT 91-0011-2007-08)

0.0240 Kayu papan meranti kw. 1 a. Rp. 4,968,333.33 = Rp. 119,240.00

0.3000 kg Lem Kayu a. Rp. 17,500.00 = Rp. 5,250.00

1.0000 Kaca 5 mm polos putih a. Rp. 66,000.00 = Rp. 66,000.00

0.8000 Pekerja a. Rp. 35,000.00 = Rp. 28,000.00

2.0000 Tukang kayu a. Rp. 49,000.00 = Rp. 98,000.00

0.2000 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 10,200.00

0.0400 Mandor a. Rp. 53,000.00 = Rp. 2,120.00

Jumlah = Rp. 328,810.00

Dibulatkan = Rp. 328,810.00

9. PAS. PINTU / JENDELA JALUSI (SNI DT 91-0011-2007-09)

0.0640 Kayu papan meranti kw. 1 a. Rp. 4,968,333.33 = Rp. 317,973.33

0.5000 kg Lem Kayu a. Rp. 17,500.00 = Rp. 8,750.00

1.0000 Pekerja a. Rp. 35,000.00 = Rp. 35,000.00

3.0000 Tukang kayu a. Rp. 49,000.00 = Rp. 147,000.00

0.3000 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 15,300.00

0.0500 Mandor a. Rp. 53,000.00 = Rp. 2,650.00

Jumlah = Rp. 526,673.33

Dibulatkan = Rp. 526,673.00

10. PAS. JALUSI MATI KUSEN KAYU MERANTI (SNI DT 91-0011-2007-10)

0.0600 Kayu papan meranti kw. 1 a. Rp. 4,968,333.33 = Rp. 298,100.00

0.1500 kg Paku a. Rp. 13,343.00 = Rp. 2,001.45

0.5000 Pekerja a. Rp. 35,000.00 = Rp. 17,500.00

2.0000 Tukang kayu a. Rp. 49,000.00 = Rp. 98,000.00

0.2000 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 10,200.00

0.0250 Mandor a. Rp. 53,000.00 = Rp. 1,325.00

Jumlah = Rp. 427,126.45

Dibulatkan = Rp. 427,126.00

11. PAS. DAUN PINTU / JENDELA PANIL (SNI DT 91-0011-2007-11)

0.0400 Kayu papan meranti kw. 1 a. Rp. 4,968,333.33 = Rp. 198,733.33

0.5000 kg Lem Kayu a. Rp. 17,500.00 = Rp. 8,750.00

1.0000 Pekerja a. Rp. 35,000.00 = Rp. 35,000.00

2.5000 Tukang kayu a. Rp. 49,000.00 = Rp. 122,500.00

0.2500 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 12,750.00

0.0500 Mandor a. Rp. 53,000.00 = Rp. 2,650.00

Jumlah = Rp. 380,383.33

Dibulatkan = Rp. 380,383.00

12. 1 M' (SNI DT 91-0011-2007-12)

0.0108 Kayu papan meranti kw. 2 a. Rp. 4,675,000.00 = Rp. 50,490.00

0.1000 kg Paku usuk a. Rp. 13,343.00 = Rp. 1,334.30

0.1000 Pekerja a. Rp. 35,000.00 = Rp. 3,500.00

0.2000 Tukang kayu a. Rp. 49,000.00 = Rp. 9,800.00

0.0250 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 1,275.00

0.0050 Mandor a. Rp. 53,000.00 = Rp. 265.00

Jumlah = Rp. 66,664.30

Dibulatkan = Rp. 66,664.00

13. 1 M' (SNI DT 91-0011-2007-13)

0.0110 Kayu papan meranti kw. 2 a. Rp. 4,675,000.00 = Rp. 51,425.00

0.0500 kg Paku usuk a. Rp. 13,343.00 = Rp. 667.15

0.1000 Pekerja a. Rp. 35,000.00 = Rp. 3,500.00

0.2000 Tukang kayu a. Rp. 49,000.00 = Rp. 9,800.00

0.0200 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 1,020.00

0.0050 Mandor a. Rp. 53,000.00 = Rp. 265.00

Jumlah = Rp. 66,677.15

m3

1 M2

m3

m2

1 M2

m3

1 M2

m3

1 M2

m3

PASANG LISPLANK KAYU MERANTI 3/20

m3

PASANG LISPLANK KAYU MERANTI 3/30

m3

Page 29: Analis 2012 Gedung

29

Dibulatkan = Rp. 66,677.00

BAHAN KAYU BENGKIRAI

14. PASANGAN KUDA - KUDA EXPOSE (SNI DT 91-0011-2007-14)

1.2000 Kayu balok bengkirai kw. I a. Rp. 7,768,750.00 = Rp. 9,322,500.00

15.0000 kg Besi strip a. Rp. 14,500.00 = Rp. 217,500.00

5.6000 kg Paku a. Rp. 13,343.00 = Rp. 74,720.80

6.0000 Pekerja a. Rp. 35,000.00 = Rp. 210,000.00

20.0000 Tukang kayu a. Rp. 49,000.00 = Rp. 980,000.00

2.0000 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 102,000.00

0.3000 Mandor a. Rp. 53,000.00 = Rp. 15,900.00

Jumlah = Rp. 10,922,620.80

Dibulatkan = Rp. 10,922,620.00

15. PASANGAN KUDA - KUDA (SNI DT 91-0011-2007-15)

1.1000 Kayu balok bengkirai kw. II a. Rp. 6,992,857.14 = Rp. 7,692,142.85

15.0000 kg Besi strip a. Rp. 14,500.00 = Rp. 217,500.00

5.6000 kg Paku a. Rp. 13,343.00 = Rp. 74,720.80

4.0000 Pekerja a. Rp. 35,000.00 = Rp. 140,000.00

12.0000 Tukang kayu a. Rp. 49,000.00 = Rp. 588,000.00

1.2000 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 61,200.00

0.2000 Mandor a. Rp. 53,000.00 = Rp. 10,600.00

Jumlah = Rp. 8,784,163.65

Dibulatkan = Rp. 8,784,163.00

15. PASANGAN KUDA - KUDA KAYU LAMA (SNI DT 91-0011-2007-15.a)

15.0000 kg Besi strip a. Rp. 14,500.00 = Rp. 217,500.00

5.6000 kg Paku a. Rp. 13,343.00 = Rp. 74,720.80

4.0000 Pekerja a. Rp. 35,000.00 = Rp. 140,000.00

12.0000 Tukang kayu a. Rp. 49,000.00 = Rp. 588,000.00

1.2000 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 61,200.00

0.2000 Mandor a. Rp. 53,000.00 = Rp. 10,600.00

Jumlah = Rp. 1,092,020.80

Dibulatkan = Rp. 1,092,020.00

16. PASANGAN GORDENG (SNI DT 91-0011-2007-16)

1.1000 Kayu balok bengkirai kw. II a. Rp. 6,992,857.14 = Rp. 7,692,142.85

15.0000 kg Besi strip a. Rp. 14,500.00 = Rp. 217,500.00

3.0000 kg Paku a. Rp. 13,343.00 = Rp. 40,029.00

2.4000 Pekerja a. Rp. 35,000.00 = Rp. 84,000.00

7.2000 Tukang kayu a. Rp. 49,000.00 = Rp. 352,800.00

0.7200 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 36,720.00

0.1200 Mandor a. Rp. 53,000.00 = Rp. 6,360.00

Jumlah = Rp. 8,429,551.85

Dibulatkan = Rp. 8,429,551.00

16. PASANGAN GORDENG KAYU LAMA (SNI DT 91-0011-2007-16.a)

15.0000 kg Besi strip a. Rp. 14,500.00 = Rp. 217,500.00

3.0000 kg Paku a. Rp. 13,343.00 = Rp. 40,029.00

2.4000 Pekerja a. Rp. 35,000.00 = Rp. 84,000.00

7.2000 Tukang kayu a. Rp. 49,000.00 = Rp. 352,800.00

0.7200 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 36,720.00

0.1200 Mandor a. Rp. 53,000.00 = Rp. 6,360.00

Jumlah = Rp. 737,409.00

Dibulatkan = Rp. 737,409.00

17. PASANGAN USUK/RENG BENGKIRAI UNTUK GENTENG PRESS/LOKAL (SNI DT 91-0011-2007-17)

0.0120 Kayu gergajian 4/6 ; 5/7 kw. II a. Rp. 4,730,000.00 = Rp. 56,760.00

0.0036 Reng bengkirai a. Rp. 4,436,666.67 = Rp. 15,972.00

0.2500 kg Paku usuk a. Rp. 13,343.00 = Rp. 3,335.75

0.1000 Pekerja a. Rp. 35,000.00 = Rp. 3,500.00

0.1000 Tukang kayu a. Rp. 49,000.00 = Rp. 4,900.00

0.0100 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 510.00

0.0050 Mandor a. Rp. 53,000.00 = Rp. 265.00

Jumlah = Rp. 85,242.75

Dibulatkan = Rp. 85,242.00

1 M3

m3

1 M3

m3

1 M3

1 M3

m3

1 M3

1 M2

m3

m3

Page 30: Analis 2012 Gedung

30

17. PASANGAN USUK KAYU LAMA DAN RENG KAYU BENGKIRAI BARU (SNI DT 91-0011-2007-17.a)

0.0036 Reng bengkirai a. Rp. 4,436,666.67 = Rp. 15,972.00

0.2500 kg Paku usuk a. Rp. 13,343.00 = Rp. 3,335.75

0.1000 Pekerja a. Rp. 35,000.00 = Rp. 3,500.00

0.1000 Tukang kayu a. Rp. 49,000.00 = Rp. 4,900.00

0.0100 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 510.00

0.0050 Mandor a. Rp. 53,000.00 = Rp. 265.00

Jumlah = Rp. 28,482.75

Dibulatkan = Rp. 28,482.00

18. PAS.USUK/RENG BENGKIRAI UNTUK GENTENG BETON DAN MONIER (SNI DT 91-0011-2007-18)

0.0120 Kayu gergajian 4/6 ; 5/7 kw. II a. Rp. 4,730,000.00 = Rp. 56,760.00

0.0057 Reng bengkirai a. Rp. 4,436,666.67 = Rp. 25,289.00

0.2500 kg Paku usuk a. Rp. 13,343.00 = Rp. 3,335.75

0.1000 Pekerja a. Rp. 35,000.00 = Rp. 3,500.00

0.1000 Tukang kayu a. Rp. 49,000.00 = Rp. 4,900.00

0.0100 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 510.00

0.0050 Mandor a. Rp. 53,000.00 = Rp. 265.00

Jumlah = Rp. 94,559.75

Dibulatkan = Rp. 94,559.00

18.a PAS.USUK KAYU LAMA & RENG KAYU BENGKIRAI BARU (SNI DT 91-0011-2007-18.a)

0.0057 Reng bengkirai a. Rp. 4,436,666.67 = Rp. 25,289.00

0.2500 kg Paku usuk a. Rp. 13,343.00 = Rp. 3,335.75

0.1000 Pekerja a. Rp. 35,000.00 = Rp. 3,500.00

0.1000 Tukang kayu a. Rp. 49,000.00 = Rp. 4,900.00

0.0100 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 510.00

0.0050 Mandor a. Rp. 53,000.00 = Rp. 265.00

Jumlah = Rp. 37,799.75

Dibulatkan = Rp. 37,799.00

19. PAS. RANGKA PLAFOND (50X100) Cm BENGKIRAI (SNI DT 91-0011-2007-19)

0.0154 Kayu bengkirai 5/7 kw. II a. Rp. 4,730,000.00 = Rp. 72,842.00

0.2000 kg Paku usuk a. Rp. 13,343.00 = Rp. 2,668.60

0.1500 Pekerja a. Rp. 35,000.00 = Rp. 5,250.00

0.2500 Tukang kayu a. Rp. 49,000.00 = Rp. 12,250.00

0.0250 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 1,275.00

0.0750 Mandor a. Rp. 53,000.00 = Rp. 3,975.00

Jumlah = Rp. 98,260.60

Dibulatkan = Rp. 98,260.00

20. PAS. RANGKA PLAFOND (60X120) Cm BENGKIRAI (SNI DT 91-0011-2007-20)

0.0142 Kayu bengkirai 5/7 kw. II a. Rp. 4,730,000.00 = Rp. 67,166.00

0.2500 kg Paku usuk a. Rp. 13,343.00 = Rp. 3,335.75

0.2000 Pekerja a. Rp. 35,000.00 = Rp. 7,000.00

0.3000 Tukang kayu a. Rp. 49,000.00 = Rp. 14,700.00

0.0300 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 1,530.00

0.0100 Mandor a. Rp. 53,000.00 = Rp. 530.00

Jumlah = Rp. 94,261.75

Dibulatkan = Rp. 94,261.00

21. PASANGAN KUSEN KAYU BENGKIRAI (SNI DT 91-0011-2007-21)

1.1000 Kayu balok bengkirai KW. 1 a. Rp. 7,768,750.00 = Rp. 8,545,625.00

1.2500 kg Paku a. Rp. 13,343.00 = Rp. 16,678.75

1.0000 kg Lem Kayu a. Rp. 17,500.00 = Rp. 17,500.00

6.0000 Pekerja a. Rp. 35,000.00 = Rp. 210,000.00

20.0000 Tukang kayu a. Rp. 49,000.00 = Rp. 980,000.00

2.0000 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 102,000.00

0.3000 Mandor a. Rp. 53,000.00 = Rp. 15,900.00

Jumlah = Rp. 9,887,703.75

Dibulatkan = Rp. 9,887,703.00

22. PASANGAN KUSEN KAYU BENGKIRAI (SNI DT 91-0011-2007-22)

1.1000 Kayu balok bengkirai KW. 2 a. Rp. 6,992,857.14 = Rp. 7,692,142.85

1.2500 kg Paku a. Rp. 13,343.00 = Rp. 16,678.75

1.0000 kg Lem Kayu a. Rp. 17,500.00 = Rp. 17,500.00

6.0000 Pekerja a. Rp. 35,000.00 = Rp. 210,000.00

1 M2

m3

1 M2

m3

m3

1 M2

m3

1 M2

m3

1 M2

m3

1 M3

m3

1 M3

m3

Page 31: Analis 2012 Gedung

31

20.0000 Tukang kayu a. Rp. 49,000.00 = Rp. 980,000.00

2.0000 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 102,000.00

0.3000 Mandor a. Rp. 53,000.00 = Rp. 15,900.00

Jumlah = Rp. 9,034,221.60

Dibulatkan = Rp. 9,034,221.00

23. PAS. DAUN PINTU / JENDELA KACA RAYBEN (SNI DT 91-0011-2007-23)

0.0240 Kayu papan bengkirai a. Rp. 8,030,000.00 = Rp. 192,720.00

0.3000 kg Lem Kayu a. Rp. 17,500.00 = Rp. 5,250.00

1.0000 Kaca 5 mm Rayben ( Asahimas ) a. Rp. 77,000.00 = Rp. 77,000.00

0.8000 Pekerja a. Rp. 35,000.00 = Rp. 28,000.00

2.0000 Tukang kayu a. Rp. 49,000.00 = Rp. 98,000.00

0.2000 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 10,200.00

0.0400 Mandor a. Rp. 53,000.00 = Rp. 2,120.00

Jumlah = Rp. 413,290.00

Dibulatkan = Rp. 413,290.00

24. PAS. DAUN PINTU / JENDELA KACA POLOS (SNI DT 91-0011-2007-24)

0.0240 Kayu papan bengkirai a. Rp. 8,030,000.00 = Rp. 192,720.00

0.3000 kg Lem Kayu a. Rp. 17,500.00 = Rp. 5,250.00

1.0000 Kaca 5 mm polos putih a. Rp. 66,000.00 = Rp. 66,000.00

0.8000 Pekerja a. Rp. 35,000.00 = Rp. 28,000.00

2.0000 Tukang kayu a. Rp. 49,000.00 = Rp. 98,000.00

0.2000 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 10,200.00

0.0400 Mandor a. Rp. 53,000.00 = Rp. 2,120.00

Jumlah = Rp. 402,290.00

Dibulatkan = Rp. 402,290.00

25. PAS. PINTU / JENDELA JALUSI (SNI DT 91-0011-2007-25)

0.0640 Kayu papan bengkirai a. Rp. 8,030,000.00 = Rp. 513,920.00

0.5000 kg Lem Kayu a. Rp. 17,500.00 = Rp. 8,750.00

1.0000 Pekerja a. Rp. 35,000.00 = Rp. 35,000.00

3.0000 Tukang kayu a. Rp. 49,000.00 = Rp. 147,000.00

0.3000 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 15,300.00

0.0500 Mandor a. Rp. 53,000.00 = Rp. 2,650.00

Jumlah = Rp. 722,620.00

Dibulatkan = Rp. 722,620.00

26. PAS. JALUSI MATI KUSEN KAYU BENGKIRAI (SNI DT 91-0011-2007-26)

0.0600 Kayu papan bengkirai a. Rp. 8,030,000.00 = Rp. 481,800.00

0.1500 kg Paku a. Rp. 13,343.00 = Rp. 2,001.45

0.5000 Pekerja a. Rp. 35,000.00 = Rp. 17,500.00

2.0000 Tukang kayu a. Rp. 49,000.00 = Rp. 98,000.00

0.2000 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 10,200.00

0.0250 Mandor a. Rp. 53,000.00 = Rp. 1,325.00

Jumlah = Rp. 610,826.45

Dibulatkan = Rp. 610,826.00

27. PAS. DAUN PINTU / JENDELA PANIL (SNI DT 91-0011-2007-27)

0.0400 Kayu papan bengkirai a. Rp. 8,030,000.00 = Rp. 321,200.00

0.5000 kg Lem Kayu a. Rp. 17,500.00 = Rp. 8,750.00

1.0000 Pekerja a. Rp. 35,000.00 = Rp. 35,000.00

2.5000 Tukang kayu a. Rp. 49,000.00 = Rp. 122,500.00

0.2500 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 12,750.00

0.0500 Mandor a. Rp. 53,000.00 = Rp. 2,650.00

Jumlah = Rp. 502,850.00

Dibulatkan = Rp. 502,850.00

28. 1 M' (SNI DT 91-0011-2007-28)

0.0108 Kayu papan bengkirai a. Rp. 8,030,000.00 = Rp. 86,724.00

0.1000 kg Paku usuk a. Rp. 13,343.00 = Rp. 1,334.30

0.1000 Pekerja a. Rp. 35,000.00 = Rp. 3,500.00

0.2000 Tukang kayu a. Rp. 49,000.00 = Rp. 9,800.00

0.0250 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 1,275.00

0.0050 Mandor a. Rp. 53,000.00 = Rp. 265.00

Jumlah = Rp. 102,898.30

Dibulatkan = Rp. 102,898.00

1 M2

m3

m2

1 M2

m3

m2

1 M2

m3

1 M2

m3

1 M2

m3

PASANG LISPLANK KAYU BENGKIRAI 3/20

m3

Page 32: Analis 2012 Gedung

32

29. 1 M' (SNI DT 91-0011-2007-29)

0.0110 Kayu papan bengkirai a. Rp. 8,030,000.00 = Rp. 88,330.00

0.0500 kg Paku usuk a. Rp. 13,343.00 = Rp. 667.15

0.1000 Pekerja a. Rp. 35,000.00 = Rp. 3,500.00

0.2000 Tukang kayu a. Rp. 49,000.00 = Rp. 9,800.00

0.0200 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 1,020.00

0.0050 Mandor a. Rp. 53,000.00 = Rp. 265.00

Jumlah = Rp. 103,582.15

Dibulatkan = Rp. 103,582.00

BAHAN KAYU KAMFER

30. PASANGAN KUDA - KUDA (SNI DT 91-0011-2007-30)

1.1000 Kayu balok kamfer kw. 2 a. Rp. 6,875,000.00 = Rp. 7,562,500.00

15.0000 kg Besi strip a. Rp. 14,500.00 = Rp. 217,500.00

5.6000 kg Paku a. Rp. 13,343.00 = Rp. 74,720.80

4.0000 Pekerja a. Rp. 35,000.00 = Rp. 140,000.00

12.0000 Tukang kayu a. Rp. 49,000.00 = Rp. 588,000.00

1.2000 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 61,200.00

0.2000 Mandor a. Rp. 53,000.00 = Rp. 10,600.00

Jumlah = Rp. 8,654,520.80

Dibulatkan = Rp. 8,654,520.00

31. PASANGAN USUK/RENG KAMPER UNTUK GENTENG PRESS/LOKAL (SNI DT 91-0011-2007-31)

0.0120 Kayu gergajian 4/6 ; 5/7 a. Rp. 4,950,000.00 = Rp. 59,400.00

0.0036 Reng kamper a. Rp. 4,317,500.00 = Rp. 15,543.00

0.2500 kg Paku usuk a. Rp. 13,343.00 = Rp. 3,335.75

0.1000 Pekerja a. Rp. 35,000.00 = Rp. 3,500.00

0.1000 Tukang kayu a. Rp. 49,000.00 = Rp. 4,900.00

0.0100 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 510.00

0.0050 Mandor a. Rp. 53,000.00 = Rp. 265.00

Jumlah = Rp. 87,453.75

Dibulatkan = Rp. 87,453.00

32. PAS. USUK/RENG KAMPER UNTUK GENTENG BETON DAN MONIER (SNI DT 91-0011-2007-32)

0.0120 Kayu gergajian 4/6 ; 5/7 a. Rp. 4,950,000.00 = Rp. 59,400.00

0.0057 Reng kamper a. Rp. 4,317,500.00 = Rp. 24,609.75

0.2500 kg Paku usuk a. Rp. 13,343.00 = Rp. 3,335.75

0.1000 Pekerja a. Rp. 35,000.00 = Rp. 3,500.00

0.1000 Tukang kayu a. Rp. 49,000.00 = Rp. 4,900.00

0.0100 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 510.00

0.0050 Mandor a. Rp. 53,000.00 = Rp. 265.00

Jumlah = Rp. 96,520.50

Dibulatkan = Rp. 96,520.00

33. PASANGAN KUSEN (SNI DT 91-0011-2007-33)

1.1000 Kayu balok kamper kw. II a. Rp. 6,875,000.00 = Rp. 7,562,500.00

1.2500 kg Paku a. Rp. 13,343.00 = Rp. 16,678.75

1.0000 kg Lem Kayu a. Rp. 17,500.00 = Rp. 17,500.00

6.0000 Pekerja a. Rp. 35,000.00 = Rp. 210,000.00

20.0000 Tukang kayu a. Rp. 49,000.00 = Rp. 980,000.00

2.0000 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 102,000.00

0.3000 Mandor a. Rp. 53,000.00 = Rp. 15,900.00

Jumlah = Rp. 8,904,578.75

Dibulatkan = Rp. 8,904,578.00

34. PAS. DAUN PINTU / JENDELA KACA RAYBEN (SNI DT 91-0011-2007-34)

0.0240 Kayu papan kamper a. Rp. 8,800,000.00 = Rp. 211,200.00

0.3000 kg Lem Kayu a. Rp. 17,500.00 = Rp. 5,250.00

1.0000 Kaca 5 mm Rayben ( Asahimas ) a. Rp. 77,000.00 = Rp. 77,000.00

0.8000 Pekerja a. Rp. 35,000.00 = Rp. 28,000.00

2.0000 Tukang kayu a. Rp. 49,000.00 = Rp. 98,000.00

0.2000 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 10,200.00

0.0400 Mandor a. Rp. 53,000.00 = Rp. 2,120.00

Jumlah = Rp. 431,770.00

Dibulatkan = Rp. 431,770.00

35. PAS. DAUN PINTU / JENDELA KACA POLOS (SNI DT 91-0011-2007-35)

PASANG LISPLANK KAYU BENGKIRAI 3/30

m3

1 M3

m3

1 M2

m3

m3

1 M2

m3

m3

1 M3

m3

1 M2

m3

m2

1 M2

Page 33: Analis 2012 Gedung

33

0.0240 Kayu papan kamper a. Rp. 8,800,000.00 = Rp. 211,200.00

0.3000 kg Lem Kayu a. Rp. 17,500.00 = Rp. 5,250.00

1.0000 Kaca 5 mm polos putih a. Rp. 66,000.00 = Rp. 66,000.00

0.8000 Pekerja a. Rp. 35,000.00 = Rp. 28,000.00

2.0000 Tukang kayu a. Rp. 49,000.00 = Rp. 98,000.00

0.2000 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 10,200.00

0.0400 Mandor a. Rp. 53,000.00 = Rp. 2,120.00

Jumlah = Rp. 420,770.00

Dibulatkan = Rp. 420,770.00

36. PAS. DAUN PINTU / JENDELA JALUSI (SNI DT 91-0011-2007-36)

0.0640 Kayu papan kamper a. Rp. 8,800,000.00 = Rp. 563,200.00

0.5000 kg Lem Kayu a. Rp. 17,500.00 = Rp. 8,750.00

1.0000 Pekerja a. Rp. 35,000.00 = Rp. 35,000.00

3.0000 Tukang kayu a. Rp. 49,000.00 = Rp. 147,000.00

0.3000 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 15,300.00

0.0500 Mandor a. Rp. 53,000.00 = Rp. 2,650.00

Jumlah = Rp. 771,900.00

Dibulatkan = Rp. 771,900.00

37. PAS. JALUSI MATI KUSEN KAYU KAMPER (SNI DT 91-0011-2007-37)

0.0600 Kayu papan kamper a. Rp. 8,800,000.00 = Rp. 528,000.00

0.1500 kg Paku a. Rp. 13,343.00 = Rp. 2,001.45

0.5000 Pekerja a. Rp. 35,000.00 = Rp. 17,500.00

2.0000 Tukang kayu a. Rp. 49,000.00 = Rp. 98,000.00

0.2000 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 10,200.00

0.0250 Mandor a. Rp. 53,000.00 = Rp. 1,325.00

Jumlah = Rp. 657,026.45

Dibulatkan = Rp. 657,026.00

38. PAS. DAUN PINTU / JENDELA PANIL (SNI DT 91-0011-2007-38)

0.0400 Kayu papan kanfer a. Rp. 8,800,000.00 = Rp. 352,000.00

0.5000 kg Lem Kayu a. Rp. 17,500.00 = Rp. 8,750.00

1.0000 Pekerja a. Rp. 35,000.00 = Rp. 35,000.00

2.5000 Tukang kayu a. Rp. 49,000.00 = Rp. 122,500.00

0.2500 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 12,750.00

0.0500 Mandor a. Rp. 53,000.00 = Rp. 2,650.00

Jumlah = Rp. 533,650.00

Dibulatkan = Rp. 533,650.00

BAHAN KAYU JATI

39. PASANGAN KUSEN JAYU JATI (SNI DT 91-0011-2007-39)

1.1000 Kayu balok jati a. Rp. 11,000,000.00 = Rp. 12,100,000.00

1.2500 kg Paku a. Rp. 13,343.00 = Rp. 16,678.75

1.0000 kg Lem Kayu a. Rp. 17,500.00 = Rp. 17,500.00

6.0000 Pekerja a. Rp. 35,000.00 = Rp. 210,000.00

20.0000 Tukang kayu a. Rp. 49,000.00 = Rp. 980,000.00

2.0000 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 102,000.00

0.3000 Mandor a. Rp. 53,000.00 = Rp. 15,900.00

Jumlah = Rp. 13,442,078.75

Dibulatkan = Rp. 13,442,078.00

40. PAS. DAUN PINTU / JENDELA KACA KAYU JATI (SNI DT 91-0011-2007-40)

0.0240 Kayu jati (papan) a. Rp. 12,460,000.00 = Rp. 299,040.00

0.3000 kg Lem Kayu a. Rp. 17,500.00 = Rp. 5,250.00

1.0000 Kaca 5 mm Rayban Asahimas a. Rp. 77,000.00 = Rp. 77,000.00

0.8000 Pekerja a. Rp. 35,000.00 = Rp. 28,000.00

2.0000 Tukang kayu a. Rp. 49,000.00 = Rp. 98,000.00

0.2000 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 10,200.00

0.0400 Mandor a. Rp. 53,000.00 = Rp. 2,120.00

Jumlah = Rp. 519,610.00

Dibulatkan = Rp. 519,610.00

41. PAS. DAUN PINTU / JENDELA JALUSI (SNI DT 91-0011-2007-41)

0.0640 Kayu jati (papan) a. Rp. 12,460,000.00 = Rp. 797,440.00

0.5000 kg Lem Kayu a. Rp. 17,500.00 = Rp. 8,750.00

1.0000 Pekerja a. Rp. 35,000.00 = Rp. 35,000.00

m3

m2

1 M2

m3

1 M2

m3

1 M2

m3

1 M3

m3

1 M2

m3

m2

1 M2

m3

Page 34: Analis 2012 Gedung

34

3.0000 Tukang kayu a. Rp. 49,000.00 = Rp. 147,000.00

0.3000 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 15,300.00

0.0500 Mandor a. Rp. 53,000.00 = Rp. 2,650.00

Jumlah = Rp. 1,006,140.00

Dibulatkan = Rp. 1,006,140.00

42. PAS. JALUSI MATI KUSEN KAYU JATI (SNI DT 91-0011-2007-42)

0.0600 Kayu jati, papan a. Rp. 12,460,000.00 = Rp. 747,600.00

0.1500 kg Paku a. Rp. 13,343.00 = Rp. 2,001.45

0.5000 Pekerja a. Rp. 35,000.00 = Rp. 17,500.00

2.0000 Tukang kayu a. Rp. 49,000.00 = Rp. 98,000.00

0.2000 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 10,200.00

0.0250 Mandor a. Rp. 53,000.00 = Rp. 1,325.00

Jumlah = Rp. 876,626.45

Dibulatkan = Rp. 876,626.00

43. PAS. DAUN PINTU / JENDELA PANIL KAYU JATI (SNI DT 91-0011-2007-43)

0.0400 Kayu jati, papan a. Rp. 12,460,000.00 = Rp. 498,400.00

0.5000 kg Lem Kayu a. Rp. 17,500.00 = Rp. 8,750.00

1.0000 Pekerja a. Rp. 35,000.00 = Rp. 35,000.00

2.5000 Tukang kayu a. Rp. 49,000.00 = Rp. 122,500.00

0.2500 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 12,750.00

0.0500 Mandor a. Rp. 53,000.00 = Rp. 2,650.00

Jumlah = Rp. 680,050.00

Dibulatkan = Rp. 680,050.00

44. 1 M' (SNI DT 91-0011-2007-44)

0.0110 Kayu jati, papan a. Rp. 12,460,000.00 = Rp. 137,060.00

0.0500 kg Paku usuk a. Rp. 13,343.00 = Rp. 667.15

0.1000 Pekerja a. Rp. 35,000.00 = Rp. 3,500.00

0.2000 Tukang kayu a. Rp. 49,000.00 = Rp. 9,800.00

0.0200 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 1,020.00

0.0050 Mandor a. Rp. 53,000.00 = Rp. 265.00

Jumlah = Rp. 152,312.15

Dibulatkan = Rp. 152,312.00

PEMBUATAN DAUN PINTU LAPIS

45. PINTU DOUBLE TRIPLEK RANGKA KAYU BENGKIRAI (SNI DT 91-0011-2007-45)

0.025 Papan kayu bengkirai a. Rp. 8,030,000.00 = Rp. 200,750.00

1.0000 lbr Triplek 4 mm (Uk. 110x210) a. Rp. 46,828.57 = Rp. 46,828.57

0.0300 kg Paku a. Rp. 13,343.00 = Rp. 400.29

0.5000 kg Lem kayu a. Rp. 17,500.00 = Rp. 8,750.00

0.6000 Pekerja a. Rp. 35,000.00 = Rp. 21,000.00

2.0000 Tukang kayu a. Rp. 49,000.00 = Rp. 98,000.00

0.2000 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 10,200.00

0.0300 Mandor a. Rp. 53,000.00 = Rp. 1,590.00

Jumlah = Rp. 387,518.86

Dibulatkan = Rp. 387,518.00

46. PINTU DOUBLE TEAKWOOD RANGKA KAYU BENGKIRAI (SNI DT 91-0011-2007-46)

0.025 Papan kayu bengkirai a. Rp. 8,030,000.00 = Rp. 200,750.00

1.0000 lbr Teakwood 4 mm (Uk. 110x210) a. Rp. 68,750.00 = Rp. 68,750.00

0.0300 kg Paku a. Rp. 13,343.00 = Rp. 400.29

0.5000 kg Lem kayu a. Rp. 17,500.00 = Rp. 8,750.00

0.6000 Pekerja a. Rp. 35,000.00 = Rp. 21,000.00

2.0000 Tukang kayu a. Rp. 49,000.00 = Rp. 98,000.00

0.2000 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 10,200.00

0.0300 Mandor a. Rp. 53,000.00 = Rp. 1,590.00

Jumlah = Rp. 409,440.29

Dibulatkan = Rp. 409,440.00

47. PINTU TEAKWOOD DAN LAPIS ALUMINIUM RANGKA BENGKIRAI (SNI DT 91-0011-2007-47)

0.025 Kayu bengkirai a. Rp. 8,030,000.00 = Rp. 200,750.00

0.5000 lbr Teakwood 4 mm (Uk. 110x210) a. Rp. 68,750.00 = Rp. 34,375.00

0.5000 lbr Triplek Aluminium 4 mm a. Rp. 83,875.00 = Rp. 41,937.50

0.0300 kg Paku a. Rp. 13,343.00 = Rp. 400.29

0.5000 kg Lem kayu a. Rp. 17,500.00 = Rp. 8,750.00

0.6000 Pekerja a. Rp. 35,000.00 = Rp. 21,000.00

1 M2

m3

1 M2

m3

PASANG LISPLANK KAYU JATI 3/30

m3

1 M2

m3

1 M2

m3

1 M2

m3

Page 35: Analis 2012 Gedung

35

2.0000 Tukang kayu a. Rp. 49,000.00 = Rp. 98,000.00

0.2000 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 10,200.00

0.0300 Mandor a. Rp. 53,000.00 = Rp. 1,590.00

Jumlah = Rp. 417,002.79

Dibulatkan = Rp. 417,002.00

48. PAS. DINDING PEMISAH DOUBLE TEAKWOOD RANGKA KY. BENGKIRAI (SNI DT 91-0011-2007-48)

0.028 Kayu bengkirai balok 6/12 kw. II a. Rp. 6,992,857.14 = Rp. 195,800.00

0.8600 lbr Teakwood 4 mm (Uk. 120x240) a. Rp. 77,916.67 = Rp. 67,008.34

0.1500 kg Paku a. Rp. 13,343.00 = Rp. 2,001.45

0.5600 kg Lem kayu a. Rp. 17,500.00 = Rp. 9,800.00

0.1500 Pekerja a. Rp. 35,000.00 = Rp. 5,250.00

0.4500 Tukang kayu a. Rp. 49,000.00 = Rp. 22,050.00

0.0450 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 2,295.00

0.0080 Mandor a. Rp. 53,000.00 = Rp. 424.00

Jumlah = Rp. 304,628.79

Dibulatkan = Rp. 304,628.00

49. PAS. DINDING PEMISAH DOUBLE TRIPLEK RANGKA KAYU BENGKIRAI (SNI DT 91-0011-2007-49)

0.028 Kayu bengkirai balok 6/12 kw. II a. Rp. 6,992,857.14 = Rp. 195,800.00

0.8600 lbr Triplek 4 mm (Uk. 120x240) a. Rp. 57,585.00 = Rp. 49,523.10

0.1500 kg Paku a. Rp. 13,343.00 = Rp. 2,001.45

0.5600 kg Lem kayu a. Rp. 17,500.00 = Rp. 9,800.00

0.1500 Pekerja a. Rp. 35,000.00 = Rp. 5,250.00

0.4500 Tukang kayu a. Rp. 49,000.00 = Rp. 22,050.00

0.0450 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 2,295.00

0.0080 Mandor a. Rp. 53,000.00 = Rp. 424.00

Jumlah = Rp. 287,143.55

Dibulatkan = Rp. 287,143.00

PEKERJAAN LANGIT-LANGIT ( SNI DT 91-0013-2007 )

1. PASANG ETERNIT (SNI DT 91-0013-2007-01)

1.1000 Eternit Atrisco a. Rp. 13,566.67 = Rp. 14,923.34

0.0100 kg Paku a. Rp. 13,343.00 = Rp. 133.43

0.0300 Pekerja a. Rp. 35,000.00 = Rp. 1,050.00

0.0700 Tukang kayu a. Rp. 49,000.00 = Rp. 3,430.00

0.0070 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 357.00

0.0020 Mandor a. Rp. 53,000.00 = Rp. 106.00

Jumlah = Rp. 19,999.77

Dibulatkan = Rp. 19,999.00

2. PASANG CALSIBOARD (SNI DT 91-0013-2007-02)

0.3750 lbr Calsiboard a. Rp. 58,643.75 = Rp. 21,991.41

0.0300 kg Paku a. Rp. 24,322.20 = Rp. 729.67

0.0700 Pekerja a. Rp. 35,000.00 = Rp. 2,450.00

0.1000 Tukang kayu a. Rp. 49,000.00 = Rp. 4,900.00

0.0100 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 510.00

0.0040 Mandor a. Rp. 53,000.00 = Rp. 212.00

Jumlah = Rp. 30,793.07

Dibulatkan = Rp. 30,793.00

3. 1 M' LIST PLAFOND KAYU PROFIL (SNI DT 91-0013-2007-03)

1.0500 m' Kayu profil bengkirai a. Rp. 7,095.00 = Rp. 7,449.75

0.0100 kg Paku a. Rp. 13,343.00 = Rp. 133.43

0.0500 Pekerja a. Rp. 35,000.00 = Rp. 1,750.00

0.0500 Tukang kayu a. Rp. 49,000.00 = Rp. 2,450.00

0.0050 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 255.00

0.0030 Mandor a. Rp. 53,000.00 = Rp. 159.00

Jumlah = Rp. 12,197.18

Dibulatkan = Rp. 12,197.00

PEKERJAAN PENUTUP ATAP ( SNI 03-3436-2002 )

1. PASANGAN GENTENG PRES BIASA (SNI 03-3436-2002-01)

25 bj Genteng pres biasa a. Rp. 858.00 = Rp. 21,450.00

0.0750 Tukang kayu a. Rp. 49,000.00 = Rp. 3,675.00

0.1500 Pekerja a. Rp. 35,000.00 = Rp. 5,250.00

1 M2

m3

1 M2

m3

1 M2

m2

1 M2

1 M2

Page 36: Analis 2012 Gedung

36

0.0080 Kep. Tukang a. Rp. 51,000.00 = Rp. 408.00

0.0080 Mandor a. Rp. 53,000.00 = Rp. 424.00

Jumlah = Rp. 31,207.00

Dibulatkan = Rp. 31,207.00

1.a PASANGAN GENTENG PRES BIASA LAMA (SNI 03-3436-2002-01.a)

0.0750 Tukang kayu a. Rp. 49,000.00 = Rp. 3,675.00

0.1500 Pekerja a. Rp. 35,000.00 = Rp. 5,250.00

0.0080 Kep. Tukang a. Rp. 51,000.00 = Rp. 408.00

0.0080 Mandor a. Rp. 53,000.00 = Rp. 424.00

Jumlah = Rp. 9,757.00

Dibulatkan = Rp. 9,757.00

2. 1 M' PASANGAN BUBUNGAN PRES BIASA (SNI 03-3436-2002-02)

5 bj Genteng bubung pres biasa a. Rp. 1,815.00 = Rp. 9,075.00

8.0000 kg Semen / PC a. Rp. 1,402.50 = Rp. 11,220.00

0.0320 Pasir pasang a. Rp. 102,116.67 = Rp. 3,267.73

0.2000 Tukang kayu a. Rp. 49,000.00 = Rp. 9,800.00

0.4000 Pekerja a. Rp. 35,000.00 = Rp. 14,000.00

0.0200 Kep. Tukang a. Rp. 51,000.00 = Rp. 1,020.00

0.0020 Mandor a. Rp. 53,000.00 = Rp. 106.00

Jumlah = Rp. 48,488.73

Dibulatkan = Rp. 48,488.00

3. PASANGAN GENTENG BETON BESAR (SNI 03-3436-2002-03)

9.5 bj Genteng Beton besar a. Rp. 2,970.00 = Rp. 28,215.00

0.1000 Tukang kayu a. Rp. 49,000.00 = Rp. 4,900.00

0.2000 Pekerja a. Rp. 35,000.00 = Rp. 7,000.00

0.0100 Kep. Tukang a. Rp. 51,000.00 = Rp. 510.00

0.0100 Mandor a. Rp. 53,000.00 = Rp. 530.00

Jumlah = Rp. 41,155.00

Dibulatkan = Rp. 41,155.00

4. PASANGAN GENTENG BETON KECIL (SNI 03-3436-2002-04)

11 bj Genteng beton kecil a. Rp. 2,750.00 = Rp. 30,250.00

0.1000 Tukang kayu a. Rp. 49,000.00 = Rp. 4,900.00

0.2000 Pekerja a. Rp. 35,000.00 = Rp. 7,000.00

0.0100 Kep. Tukang a. Rp. 51,000.00 = Rp. 510.00

0.0100 Mandor a. Rp. 53,000.00 = Rp. 530.00

Jumlah = Rp. 43,190.00

Dibulatkan = Rp. 43,190.00

5. 1 M' PASANGAN BUBUNGAN BETON (SNI 03-3436-2002-05)

5 bj Genteng bubung beton a. Rp. 4,653.00 = Rp. 23,265.00

10.8000 kg Semen / PC a. Rp. 1,402.50 = Rp. 15,147.00

0.0320 Pasir pasang a. Rp. 102,116.67 = Rp. 3,267.73

0.2000 Tukang kayu a. Rp. 49,000.00 = Rp. 9,800.00

0.4000 Pekerja a. Rp. 35,000.00 = Rp. 14,000.00

0.0200 Kep. Tukang a. Rp. 51,000.00 = Rp. 1,020.00

0.0020 Mandor a. Rp. 53,000.00 = Rp. 106.00

Jumlah = Rp. 66,605.73

Dibulatkan = Rp. 66,605.00

6. PASANGAN GENTENG JATIWANGI ISI 14,5 BJ (SNI 03-3436-2002-06)

14.5 bj Genteng Jatiwangi a. Rp. 4,840.00 = Rp. 70,180.00

0.1000 Tukang kayu a. Rp. 49,000.00 = Rp. 4,900.00

0.2000 Pekerja a. Rp. 35,000.00 = Rp. 7,000.00

0.0100 Kep. Tukang a. Rp. 51,000.00 = Rp. 510.00

0.0100 Mandor a. Rp. 53,000.00 = Rp. 530.00

Jumlah = Rp. 83,120.00

Dibulatkan = Rp. 83,120.00

7. 1 M' PASANGAN BUBUNGAN JATIWANGI (SNI 03-3436-2002-07)

3.5 bj Genteng bubung Jatiwangi a. Rp. 4,400.00 = Rp. 15,400.00

10.8000 kg Semen / PC a. Rp. 1,402.50 = Rp. 15,147.00

0.0320 Pasir pasang a. Rp. 102,116.67 = Rp. 3,267.73

0.2000 Tukang kayu a. Rp. 49,000.00 = Rp. 9,800.00

0.4000 Pekerja a. Rp. 35,000.00 = Rp. 14,000.00

1 M2

m3

1 M2

1 M2

m3

1 M2

m3

Page 37: Analis 2012 Gedung

37

0.0200 Kep. Tukang a. Rp. 51,000.00 = Rp. 1,020.00

0.0020 Mandor a. Rp. 53,000.00 = Rp. 106.00

Jumlah = Rp. 58,740.73

Dibulatkan = Rp. 58,740.00

8. PASANGAN GENTENG BETON BESAR BERWARNA (SNI 03-3436-2002-08)

9 bj Genteng Beton besar berwarna a. Rp. 3,300.00 = Rp. 29,700.00

0.1000 Tukang kayu a. Rp. 49,000.00 = Rp. 4,900.00

0.2000 Pekerja a. Rp. 35,000.00 = Rp. 7,000.00

0.0100 Kep. Tukang a. Rp. 51,000.00 = Rp. 510.00

0.0100 Mandor a. Rp. 53,000.00 = Rp. 530.00

Jumlah = Rp. 42,640.00

Dibulatkan = Rp. 42,640.00

9. 1 M' PASANGAN BUBUNGAN BETON BERWARNA (SNI 03-3436-2002-09)

3.5 bj Genteng bubung beton berwarna a. Rp. 3,575.00 = Rp. 12,512.50

10.8000 kg Semen / PC a. Rp. 1,402.50 = Rp. 15,147.00

0.0320 Pasir pasang a. Rp. 102,116.67 = Rp. 3,267.73

0.2000 Tukang kayu a. Rp. 49,000.00 = Rp. 9,800.00

0.4000 Pekerja a. Rp. 35,000.00 = Rp. 14,000.00

0.0200 Kep. Tukang a. Rp. 51,000.00 = Rp. 1,020.00

0.0020 Mandor a. Rp. 53,000.00 = Rp. 106.00

Jumlah = Rp. 55,853.23

Dibulatkan = Rp. 55,853.00

10. PASANGAN GENTENG BETON BESAR BERWARNA + COATING (SNI 03-3436-2002-10)

9 bj Genteng Beton besar berwarna + a. Rp. 3,740.00 = Rp. 33,660.00

Coatingan

0.1000 Tukang kayu a. Rp. 49,000.00 = Rp. 4,900.00

0.2000 Pekerja a. Rp. 35,000.00 = Rp. 7,000.00

0.0100 Kep. Tukang a. Rp. 51,000.00 = Rp. 510.00

0.0100 Mandor a. Rp. 53,000.00 = Rp. 530.00

Jumlah = Rp. 46,600.00

Dibulatkan = Rp. 46,600.00

11. 1 M' PASANGAN BUBUNGAN BETON BERWARNA + COATING (SNI 03-3436-2002-11)

3.5 bj Genteng bubung beton berwarna a. Rp. 6,050.00 = Rp. 21,175.00

+ Coatingan

10.8000 kg Semen / PC a. Rp. 1,402.50 = Rp. 15,147.00

0.0320 Pasir pasang a. Rp. 102,116.67 = Rp. 3,267.73

0.2000 Tukang kayu a. Rp. 49,000.00 = Rp. 9,800.00

0.4000 Pekerja a. Rp. 35,000.00 = Rp. 14,000.00

0.0200 Kep. Tukang a. Rp. 51,000.00 = Rp. 1,020.00

0.0020 Mandor a. Rp. 53,000.00 = Rp. 106.00

Jumlah = Rp. 64,515.73

Dibulatkan = Rp. 64,515.00

12. PASANGAN GENTENG KERAMIK (SNI 03-3436-2002-12)

14.5 bj Genteng keramik a. Rp. 7,535.00 = Rp. 109,257.50

0.0750 Tukang kayu a. Rp. 49,000.00 = Rp. 3,675.00

0.1500 Pekerja a. Rp. 35,000.00 = Rp. 5,250.00

0.0080 Kep. Tukang a. Rp. 51,000.00 = Rp. 408.00

0.0080 Mandor a. Rp. 53,000.00 = Rp. 424.00

Jumlah = Rp. 119,014.50

Dibulatkan = Rp. 119,014.00

13. 1 M' PASANGAN BUBUNGAN KERAMIK (SNI 03-3436-2002-13)

3.5 bj Genteng bubungan keramik a. Rp. 44,825.00 = Rp. 156,887.50

10.8000 kg Semen / PC a. Rp. 1,402.50 = Rp. 15,147.00

0.0320 Pasir pasang a. Rp. 102,116.67 = Rp. 3,267.73

0.2000 Tukang kayu a. Rp. 49,000.00 = Rp. 9,800.00

0.4000 Pekerja a. Rp. 35,000.00 = Rp. 14,000.00

0.0200 Kep. Tukang a. Rp. 51,000.00 = Rp. 1,020.00

0.0020 Mandor a. Rp. 53,000.00 = Rp. 106.00

Jumlah = Rp. 200,228.23

Dibulatkan = Rp. 200,228.00

14. PASANGAN GENTENG PRES KARANGPILANG EXS. GOODYEAR (SNI 03-3436-2002-14)

21 bj Genteng Karangpilang exs. Goodyear a. Rp. 2,750.00 = Rp. 57,750.00

1 M2

m3

1 M2

m3

1 M2

m3

1 M2

Page 38: Analis 2012 Gedung

38

0.0750 Tukang kayu a. Rp. 49,000.00 = Rp. 3,675.00

0.1500 Pekerja a. Rp. 35,000.00 = Rp. 5,250.00

0.0080 Kep. Tukang a. Rp. 51,000.00 = Rp. 408.00

0.0080 Mandor a. Rp. 53,000.00 = Rp. 424.00

Jumlah = Rp. 67,507.00

Dibulatkan = Rp. 67,507.00

15. 1 M' PASANGAN BUBUNGAN PRES KARANGPILANG EXS. GOODYEAR (SNI 03-3436-2002-15)

3 bj Genteng bubungan a. Rp. 4,290.00 = Rp. 12,870.00

10.8000 kg Semen / PC a. Rp. 1,402.50 = Rp. 15,147.00

0.0320 Pasir pasang a. Rp. 102,116.67 = Rp. 3,267.73

0.2000 Tukang kayu a. Rp. 49,000.00 = Rp. 9,800.00

0.4000 Pekerja a. Rp. 35,000.00 = Rp. 14,000.00

0.0200 Kep. Tukang a. Rp. 51,000.00 = Rp. 1,020.00

0.0020 Mandor a. Rp. 53,000.00 = Rp. 106.00

Jumlah = Rp. 56,210.73

Dibulatkan = Rp. 56,210.00

16. PASANGAN ASBES GELOMBANG BESAR (SNI 03-3436-2002-16)

0.3500 lbr Asbes gelombang besar a. Rp. 109,725.00 = Rp. 38,403.75

0.1200 kg Sekrup / Paku payung a. Rp. 27,500.00 = Rp. 3,300.00

0.0700 Tukang kayu a. Rp. 49,000.00 = Rp. 3,430.00

0.1400 Pekerja a. Rp. 35,000.00 = Rp. 4,900.00

0.0070 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 357.00

0.0070 Mandor a. Rp. 53,000.00 = Rp. 371.00

Jumlah = Rp. 50,761.75

Dibulatkan = Rp. 50,761.00

17. PASANGAN ASBES GELOMBANG KECIL (SNI 03-3436-2002-17)

0.3500 lbr Asbes gelombang kecil a. Rp. 106,150.00 = Rp. 37,152.50

0.1200 kg Sekrup / Paku payung a. Rp. 27,500.00 = Rp. 3,300.00

0.0700 Tukang kayu a. Rp. 49,000.00 = Rp. 3,430.00

0.1400 Pekerja a. Rp. 35,000.00 = Rp. 4,900.00

0.0070 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 357.00

0.0070 Mandor a. Rp. 53,000.00 = Rp. 371.00

Jumlah = Rp. 49,510.50

Dibulatkan = Rp. 49,510.00

18. 1 M' PASANG BUBUNG ASBES GELOMBANG BESAR (SNI 03-3436-2002-18)

1.1000 lbr Nok Asbes gelombang besar a. Rp. 53,075.00 = Rp. 58,382.50

0.2000 kg Sekrup / Paku payung a. Rp. 27,500.00 = Rp. 5,500.00

0.1250 Tukang kayu a. Rp. 49,000.00 = Rp. 6,125.00

0.0130 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 663.00

0.0840 Pekerja a. Rp. 35,000.00 = Rp. 2,940.00

0.0040 Mandor a. Rp. 53,000.00 = Rp. 212.00

Jumlah = Rp. 73,822.50

Dibulatkan = Rp. 73,822.00

19. 1 M' PASANG BUBUNG ASBES GELOMBANG KECIL (SNI 03-3436-2002-19)

1.1000 lbr Nok Asbes gelombang kecil a. Rp. 28,526.67 = Rp. 31,379.34

0.2000 bj Sekrup / Paku payung a. Rp. 27,500.00 = Rp. 5,500.00

0.1250 Tukang kayu a. Rp. 49,000.00 = Rp. 6,125.00

0.0130 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 663.00

0.0840 Pekerja a. Rp. 35,000.00 = Rp. 2,940.00

0.0040 Mandor a. Rp. 53,000.00 = Rp. 212.00

Jumlah = Rp. 46,819.34

Dibulatkan = Rp. 46,819.00

PEKERJAAN BESI DAN ALUMINIUM ( SNI DT 91-0014-2007 )

1. 1 M' PASANGAN TALANG DATAR / JURAI (SNI DT 91-0014-2007-01)

1.05000 m' Seng BJLS 30 a. Rp. 107,250.00 = Rp. 112,612.50

0.01500 kg Paku a. Rp. 13,343.00 = Rp. 200.14

0.01900 Kayu papan a. Rp. 4,950,000.00 = Rp. 94,050.00

0.40000 Tukang besi a. Rp. 47,000.00 = Rp. 18,800.00

0.02500 Kep. Tukang a. Rp. 51,000.00 = Rp. 1,275.00

0.20000 Pekerja a. Rp. 35,000.00 = Rp. 7,000.00

0.01000 Mandor a. Rp. 53,000.00 = Rp. 530.00

m3

1 M2

1 M2

m3

Page 39: Analis 2012 Gedung

39

Jumlah = Rp. 234,467.65

Dibulatkan = Rp. 234,467.00

2. 1 M' PASANGAN TALANG 1/2 LINGKARAN dia. 15 CM (SNI DT 91-0014-2007-02)

1.05000 m' Seng BJLS 30 a. Rp. 107,250.00 = Rp. 112,612.50

0.01000 kg Paku a. Rp. 13,343.00 = Rp. 133.43

0.50000 kg Besi strip a. Rp. 14,500.00 = Rp. 7,250.00

0.30000 Tukang besi a. Rp. 47,000.00 = Rp. 14,100.00

0.03000 Kep. Tukang a. Rp. 51,000.00 = Rp. 1,530.00

0.15000 Pekerja a. Rp. 35,000.00 = Rp. 5,250.00

0.00700 Mandor a. Rp. 53,000.00 = Rp. 371.00

Jumlah = Rp. 141,246.93

Dibulatkan = Rp. 141,246.00

3. 1 Kg PASANG RANGKA KUDA-KUDA BAJA WF 150 - 250 (SNI DT 91-0014-2007-03)

1.15000 kg Besi baja / WF a. Rp. 14,535.00 = Rp. 16,715.25

0.06000 Tukang las a. Rp. 47,000.00 = Rp. 2,820.00

0.00600 Kep. Tukang a. Rp. 51,000.00 = Rp. 306.00

0.06000 Pekerja a. Rp. 35,000.00 = Rp. 2,100.00

0.00300 Mandor a. Rp. 53,000.00 = Rp. 159.00

Jumlah = Rp. 22,100.25

Dibulatkan = Rp. 22,100.00

4. PASANG ROOLING DOOR ALUMINIUM (SNI DT 91-0014-2007-04)

1.00000 Rolling Door a. Rp. 341,250.00 = Rp. 341,250.00

1.00000 Tukang besi a. Rp. 47,000.00 = Rp. 47,000.00

0.10000 Kep. Tukang a. Rp. 51,000.00 = Rp. 5,100.00

1.00000 Pekerja a. Rp. 35,000.00 = Rp. 35,000.00

0.05000 Mandor a. Rp. 53,000.00 = Rp. 2,650.00

Jumlah = Rp. 431,000.00

Dibulatkan = Rp. 431,000.00

5. PASANG TERALI BESI (SNI DT 91-0014-2007-05)

6.17700 kg Besi Strip a. Rp. 14,500.00 = Rp. 89,566.50

27.08000 cm Pengelasan a. Rp. 900.00 = Rp. 24,372.00

1.67000 Tukang besi a. Rp. 47,000.00 = Rp. 78,490.00

0.16700 Kep. Tukang a. Rp. 51,000.00 = Rp. 8,517.00

1.67000 Pekerja a. Rp. 35,000.00 = Rp. 58,450.00

0.08300 Mandor a. Rp. 53,000.00 = Rp. 4,399.00

Jumlah = Rp. 263,794.50

Dibulatkan = Rp. 263,794.00

PEKERJAAN PLITURAN DAN PENGECATAN ( SNI P.C )

1. MENGGOSOK DAN MENDEMPUL KAYU ( SNI P.C.01 )

0.0800 kg Dempul / Plamir a. Rp. 19,595.71 = Rp. 1,567.66

0.0200 kg Minyak Cat a. Rp. 17,710.00 = Rp. 354.20

0.0100 kg Batu kambang a. Rp. 26,400.00 = Rp. 264.00

0.04 Tukang cat a. Rp. 42,400.00 = Rp. 1,696.00

0.004 Kep. Tukang cat a. Rp. 50,000.00 = Rp. 200.00

0.04 Pekerja a. Rp. 35,000.00 = Rp. 1,400.00

0.0025 Mandor a. Rp. 53,000.00 = Rp. 132.50

Jumlah = Rp. 5,614.36

Dibulatkan = Rp. 5,614.00

2. PELABURAN BIDANG KAYU DENGAN POLITUR ( SNI P.C.02 )

0.1500 ltr Politur a. Rp. 70,400.00 = Rp. 10,560.00

0.3720 ltr Politur Jadi a. Rp. 70,400.00 = Rp. 26,188.80

2.0000 lbr Kertas gosok a. Rp. 3,272.50 = Rp. 6,545.00

0.0600 Tukang cat a. Rp. 42,400.00 = Rp. 2,544.00

0.0160 Kep. Tukang cat a. Rp. 50,000.00 = Rp. 800.00

0.0025 Mandor a. Rp. 53,000.00 = Rp. 132.50

Jumlah = Rp. 46,770.30

Dibulatkan = Rp. 46,770.00

3. PELABURAN BIDANG KAYU DENGAN MELAMIN ( SNI P.C.02A )

0.1429 kg Dempul/wood filter a. Rp. 44,000.00 = Rp. 6,287.60

0.2000 kg Pewarna/wood sten a. Rp. 57,500.00 = Rp. 11,500.00

1 M2

m2

1 M2

1 M2

1 M2

1 M2

Page 40: Analis 2012 Gedung

40

0.5000 kg Melamin Seanding sealler a. Rp. 57,500.00 = Rp. 28,750.00

0.2000 kg Melamin lack (glass/dop) a. Rp. 60,500.00 = Rp. 12,100.00

2.5000 ltr Thinner B a. Rp. 17,710.00 = Rp. 44,275.00

2.0000 lbr Kertas gosok a. Rp. 3,272.50 = Rp. 6,545.00

0.2000 klng Compound a. Rp. 38,500.00 = Rp. 7,700.00

0.0750 Pekerja a. Rp. 35,000.00 = Rp. 2,625.00

0.0900 Tukang cat a. Rp. 42,400.00 = Rp. 3,816.00

0.0090 Kep. Tukang cat a. Rp. 50,000.00 = Rp. 450.00

0.0250 Mandor a. Rp. 53,000.00 = Rp. 1,325.00

Alat bantu compressor a. Rp. = Rp. 5,000.00

Jumlah = Rp. 130,373.60

Dibulatkan = Rp. 130,373.00

4. PELABURAN BIDANG KAYU DENGAN VERNIS ( SNI P.C.03 )

0.1500 ltr Vernis a. Rp. 36,300.00 = Rp. 5,445.00

0.0500 ltr Dempul/plamir a. Rp. 27,500.00 = Rp. 1,375.00

0.1000 lbr Kertas gosok a. Rp. 3,272.50 = Rp. 327.25

0.0100 bh Kuas a. Rp. 9,900.00 = Rp. 99.00

0.1600 Tukang cat a. Rp. 42,400.00 = Rp. 6,784.00

0.0160 Kep. Tukang cat a. Rp. 50,000.00 = Rp. 800.00

0.1600 Pekerja a. Rp. 35,000.00 = Rp. 5,600.00

0.0025 Mandor a. Rp. 53,000.00 = Rp. 132.50

Jumlah = Rp. 20,562.75

Dibulatkan = Rp. 20,562.00

5. PENGECATAN KY BARU (1 LPS PLAMIR + 1 LPS CAT DASAR + 3 LPS CAT PENUTUP) ( SNI P.C.04 )

0.2000 kg Meni Kayu Pedang a. Rp. 20,507.14 = Rp. 4,101.43

0.3500 kg Cat EMCO a. Rp. 58,300.00 = Rp. 20,405.00

0.1700 kg Cat Dasar a. Rp. 58,300.00 = Rp. 9,911.00

0.1500 kg Dempul / Plamir a. Rp. 19,595.71 = Rp. 2,939.36

0.1050 Tukang cat a. Rp. 42,400.00 = Rp. 4,452.00

0.0040 Kep. Tukang cat a. Rp. 50,000.00 = Rp. 200.00

0.0700 Pekerja a. Rp. 35,000.00 = Rp. 2,450.00

0.0025 Mandor a. Rp. 53,000.00 = Rp. 132.50

Jumlah = Rp. 44,591.28

Dibulatkan = Rp. 44,591.00

6. PENGECATAN KAYU BARU (1 LPS PLAMIR+1 LPS CAT DASAR+2 LPS CAT PENUTUP) ( SNI P.C.05)

0.2000 kg Meni Kayu Pedang a. Rp. 20,507.14 = Rp. 4,101.43

0.2600 kg Cat EMCO a. Rp. 58,300.00 = Rp. 15,158.00

0.1700 kg Cat Dasar a. Rp. 58,300.00 = Rp. 9,911.00

0.1500 kg Dempul / Plamir a. Rp. 19,595.71 = Rp. 2,939.36

0.0090 Tukang cat a. Rp. 42,400.00 = Rp. 381.60

0.0060 Kep. Tukang cat a. Rp. 50,000.00 = Rp. 300.00

0.0700 Pekerja a. Rp. 35,000.00 = Rp. 2,450.00

0.0025 Mandor a. Rp. 53,000.00 = Rp. 132.50

Jumlah = Rp. 35,373.88

Dibulatkan = Rp. 35,373.00

7. PENGECATAN KAYU LAMA (1 LPS PLAMIR+ 1 LPS CAT DASAR+ 1 LPS CAT PENUTUP) (SNI P.C.06)

0.17 kg Cat EMCO a. Rp. 58,300.00 = Rp. 9,911.00

0.17 kg Cat Dasar a. Rp. 58,300.00 = Rp. 9,911.00

0.15 kg Dempul / Plamir a. Rp. 19,595.71 = Rp. 2,939.36

0.075 Tukang cat a. Rp. 42,400.00 = Rp. 3,180.00

0.0075 Kep. Tukang cat a. Rp. 50,000.00 = Rp. 375.00

0.07 Pekerja a. Rp. 35,000.00 = Rp. 2,450.00

0.0025 Mandor a. Rp. 53,000.00 = Rp. 132.50

Jumlah = Rp. 28,898.86

Dibulatkan = Rp. 28,898.00

8.

0.0500 kg Soda api a. Rp. 27,500.00 = Rp. 1,375.00

0.1500 Pekerja a. Rp. 35,000.00 = Rp. 5,250.00

0.0025 Mandor a. Rp. 53,000.00 = Rp. 132.50

Jumlah = Rp. 6,757.50

Dibulatkan = Rp. 6,757.00

9. PENGECATAN TEMBOK BARU ( 1 LPS PLAMIR + 1 LPS CAT DASAR + 2 LPS CAT PENUTUP) (SNI P.C.08)

1 M2

1 M2

1 M2

1 M2

1 M2 MENGIKIS / MENGEROK PERMUKAAN CAT TEMBOK LAMA / M2 ( SNI.P.C.07 )

1 M2

Page 41: Analis 2012 Gedung

41

0.2600 kg Cat tembok Paragon a. Rp. 14,107.50 = Rp. 3,667.95

0.1000 kg Cat Dasar a. Rp. 14,107.50 = Rp. 1,410.75

0.1000 kg Dempul / Plamir a. Rp. 8,800.00 = Rp. 880.00

0.0630 Tukang cat a. Rp. 42,400.00 = Rp. 2,671.20

0.0063 Kep. Tukang cat a. Rp. 50,000.00 = Rp. 315.00

0.0200 Pekerja a. Rp. 35,000.00 = Rp. 700.00

0.0025 Mandor a. Rp. 53,000.00 = Rp. 132.50

Jumlah = Rp. 9,777.40

Dibulatkan = Rp. 9,777.00

10. PENGECATAN TEMBOK BARU ( 1 LPS PLAMIR + 1 LPS CAT DASAR + 2 LPS CAT PENUTUP) ( SNI P.C.09 )

0.2600 kg Cat tembok Decolith a. Rp. 15,400.00 = Rp. 4,004.00

0.1000 kg Cat Dasar a. Rp. 15,400.00 = Rp. 1,540.00

0.1000 kg Dempul / Plamir a. Rp. 8,800.00 = Rp. 880.00

0.0630 Tukang cat a. Rp. 42,400.00 = Rp. 2,671.20

0.0063 Kep. Tukang cat a. Rp. 50,000.00 = Rp. 315.00

0.0200 Pekerja a. Rp. 35,000.00 = Rp. 700.00

0.0025 Mandor a. Rp. 53,000.00 = Rp. 132.50

Jumlah = Rp. 10,242.70

Dibulatkan = Rp. 10,242.00

11. PENGECATAN TEMBOK LAMA ( 1 LAPIS CAT DASAR + 2 LPS CAT PENUTUP ) ( SNI.P.C.10 )

0.1800 kg Cat tembok Paragon a. Rp. 14,107.50 = Rp. 2,539.35

0.1200 kg Cat dasar a. Rp. 14,107.50 = Rp. 1,692.90

0.0420 Tukang cat a. Rp. 42,400.00 = Rp. 1,780.80

0.0042 Kep. Tukang cat a. Rp. 50,000.00 = Rp. 210.00

0.0280 Pekerja a. Rp. 35,000.00 = Rp. 980.00

0.0025 Mandor a. Rp. 53,000.00 = Rp. 132.50

Jumlah = Rp. 7,335.55

Dibulatkan = Rp. 7,335.00

11. PENGECATAN TEMBOK LAMA ( 1 LAPIS CAT DASAR + 1 LPS CAT PENUTUP ) ( SNI.P.C.10.A )

0.0900 kg Cat tembok Paragon a. Rp. 14,107.50 = Rp. 1,269.68

0.1200 kg Cat dasar a. Rp. 14,107.50 = Rp. 1,692.90

0.0420 Tukang cat a. Rp. 42,400.00 = Rp. 1,780.80

0.0042 Kep. Tukang cat a. Rp. 50,000.00 = Rp. 210.00

0.0280 Pekerja a. Rp. 35,000.00 = Rp. 980.00

0.0025 Mandor a. Rp. 53,000.00 = Rp. 132.50

Jumlah = Rp. 6,065.88

Dibulatkan = Rp. 6,065.00

12. PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI ( SNI.P.C.11 )

0.1000 kg Meni besi a. Rp. 20,507.14 = Rp. 2,050.71

0.0100 bh Kuas a. Rp. 9,900.00 = Rp. 99.00

0.2000 Tukang cat a. Rp. 42,400.00 = Rp. 8,480.00

0.0200 Kep. Tukang cat a. Rp. 50,000.00 = Rp. 1,000.00

0.0200 Pekerja a. Rp. 35,000.00 = Rp. 700.00

0.0100 Mandor a. Rp. 53,000.00 = Rp. 530.00

Jumlah = Rp. 12,859.71

Dibulatkan = Rp. 12,859.00

13. PENGECATAN GENTENG ( SNI.P.C.12 )

0.2600 kg Cat Genteng a. Rp. 23,333.75 = Rp. 6,066.78

0.0630 Tukang cat a. Rp. 42,400.00 = Rp. 2,671.20

0.0063 Kep. Tukang cat a. Rp. 50,000.00 = Rp. 315.00

0.0200 Pekerja a. Rp. 35,000.00 = Rp. 700.00

0.0025 Mandor a. Rp. 53,000.00 = Rp. 132.50

Jumlah = Rp. 9,885.48

Dibulatkan = Rp. 9,885.00

PEK. PENUTUP LANTAI & DINDING ( SNI DT 91-0012-2007 )

1. PASANGAN TEGEL ABU-ABU 20x20 (SNI DT 91-0012-2007-01)

1.0500 Tegel abu-abu a. Rp. 35,200.00 = Rp. 36,960.00

10.4000 kg Semen / PC a. Rp. 1,402.50 = Rp. 14,586.00

0.0450 Pasir pasang a. Rp. 102,116.67 = Rp. 4,595.25

0.1300 Tukang batu a. Rp. 46,000.00 = Rp. 5,980.00

0.0130 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 663.00

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

m2

m3

Page 42: Analis 2012 Gedung

42

0.2700 Pekerja a. Rp. 35,000.00 = Rp. 9,450.00

0.0140 Mandor a. Rp. 53,000.00 = Rp. 742.00

Jumlah = Rp. 72,976.25

Dibulatkan = Rp. 72,976.00

2. PASANGAN DINDING KERAMIK 20x25 Kw. 1 (SNI DT 91-0012-2007-02)

1.0500 a. Rp. 51,700.00 = Rp. 54,285.00

9.3000 kg Semen / PC a. Rp. 1,402.50 = Rp. 13,043.25

1.9400 kg Semen Warna a. Rp. 6,500.00 = Rp. 12,610.00

0.0180 Pasir pasang a. Rp. 102,116.67 = Rp. 1,838.10

0.4500 Tukang batu a. Rp. 46,000.00 = Rp. 20,700.00

0.0450 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 2,295.00

0.6000 Pekerja a. Rp. 35,000.00 = Rp. 21,000.00

0.0300 Mandor a. Rp. 53,000.00 = Rp. 1,590.00

Jumlah = Rp. 127,361.35

Dibulatkan = Rp. 127,361.00

3. PASANGAN DINDING KERAMIK 20x25 Kw. 1 (SNI DT 91-0012-2007-03)

1.0500 a. Rp. 46,650.00 = Rp. 48,982.50

9.3000 kg Semen / PC a. Rp. 1,402.50 = Rp. 13,043.25

1.9400 kg Semen Warna a. Rp. 6,500.00 = Rp. 12,610.00

0.0180 Pasir pasang a. Rp. 102,116.67 = Rp. 1,838.10

0.4500 Tukang batu a. Rp. 46,000.00 = Rp. 20,700.00

0.0450 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 2,295.00

0.6000 Pekerja a. Rp. 35,000.00 = Rp. 21,000.00

0.0300 Mandor a. Rp. 53,000.00 = Rp. 1,590.00

Jumlah = Rp. 122,058.85

Dibulatkan = Rp. 122,058.00

4. PASANGAN DINDING KERAMIK 20x25 Kw. 1 (SNI DT 91-0012-2007-04)

1.0500 Keramik 20x25 polos Mulia a. Rp. 38,500.00 = Rp. 40,425.00

9.3000 kg Semen / PC a. Rp. 1,402.50 = Rp. 13,043.25

1.9400 kg Semen Warna a. Rp. 6,500.00 = Rp. 12,610.00

0.0180 Pasir pasang a. Rp. 102,116.67 = Rp. 1,838.10

0.4500 Tukang batu a. Rp. 46,000.00 = Rp. 20,700.00

0.0450 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 2,295.00

0.6000 Pekerja a. Rp. 35,000.00 = Rp. 21,000.00

0.0300 Mandor a. Rp. 53,000.00 = Rp. 1,590.00

Jumlah = Rp. 113,501.35

Dibulatkan = Rp. 113,501.00

5. PASANGAN LANTAI KERAMIK 30x30 Kw. 1 (SNI DT 91-0012-2007-05)

1.0500 Keramik 30x30 polos Roman a. Rp. 37,766.67 = Rp. 39,655.00

10.0000 kg Semen / PC a. Rp. 1,402.50 = Rp. 14,025.00

1.5000 kg Semen warna a. Rp. 6,500.00 = Rp. 9,750.00

0.0450 Pasir pasang a. Rp. 102,116.67 = Rp. 4,595.25

0.3500 Tukang batu a. Rp. 46,000.00 = Rp. 16,100.00

0.0350 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 1,785.00

0.6200 Pekerja a. Rp. 35,000.00 = Rp. 21,700.00

0.0300 Mandor a. Rp. 53,000.00 = Rp. 1,590.00

Jumlah = Rp. 109,200.25

Dibulatkan = Rp. 109,200.00

6. PASANGAN LANTAI KERAMIK 30x30 Kw. 1 (SNI DT 91-0012-2007-06)

1.0500 Keramik 30x30 polos Mulia a. Rp. 31,114.29 = Rp. 32,670.00

10.0000 kg Semen / PC a. Rp. 1,402.50 = Rp. 14,025.00

0.0450 Pasir pasang a. Rp. 102,116.67 = Rp. 4,595.25

1.5000 kg Semen warna a. Rp. 6,500.00 = Rp. 9,750.00

0.3500 Tukang batu a. Rp. 46,000.00 = Rp. 16,100.00

0.0350 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 1,785.00

0.6200 Pekerja a. Rp. 35,000.00 = Rp. 21,700.00

0.0300 Mandor a. Rp. 53,000.00 = Rp. 1,590.00

Jumlah = Rp. 102,215.25

Dibulatkan = Rp. 102,215.00

7. PASANGAN LANTAI KERAMIK 30x30 Kw. 1 (SNI DT 91-0012-2007-07)

1.0500 Keramik 30x30 motif a. Rp. 44,000.00 = Rp. 46,200.00

10.0000 kg Semen / PC a. Rp. 1,402.50 = Rp. 14,025.00

1 M2

m2 Keramik 20x25 ( Roman Kembang )

m3

1 M2

m2 Keramik 20x25 ( Kobin Motif )

m3

1 M2

m2

m3

1 M2

m2

m3

1 M2

m2

m3

1 M2

m2

Page 43: Analis 2012 Gedung

43

0.0450 Pasir pasang a. Rp. 102,116.67 = Rp. 4,595.25

1.5000 kg Semen warna a. Rp. 6,500.00 = Rp. 9,750.00

0.3500 Tukang batu a. Rp. 46,000.00 = Rp. 16,100.00

0.0350 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 1,785.00

0.6200 Pekerja a. Rp. 35,000.00 = Rp. 21,700.00

0.0300 Mandor a. Rp. 53,000.00 = Rp. 1,590.00

Jumlah = Rp. 115,745.25

Dibulatkan = Rp. 115,745.00

8. PASANGAN LANTAI KERAMIK 30x30 Kw. 1 (SNI DT 91-0012-2007-08)

1.0500 Keramik 30x30 Mulia sembur a. Rp. 35,475.00 = Rp. 37,248.75

10.0000 kg Semen / PC a. Rp. 1,402.50 = Rp. 14,025.00

0.0450 Pasir pasang a. Rp. 102,116.67 = Rp. 4,595.25

1.5000 kg Semen warna a. Rp. 6,500.00 = Rp. 9,750.00

0.3500 Tukang batu a. Rp. 46,000.00 = Rp. 16,100.00

0.0350 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 1,785.00

0.6200 Pekerja a. Rp. 35,000.00 = Rp. 21,700.00

0.0300 Mandor a. Rp. 53,000.00 = Rp. 1,590.00

Jumlah = Rp. 106,794.00

Dibulatkan = Rp. 106,794.00

9. PASANGAN LANTAI KERAMIK MOTIF 40x40 Kw. 1 (SNI DT 91-0012-2007-09)

1.0500 Keramik 40x40 Kw. 1 Platinum a. Rp. 54,780.00 = Rp. 57,519.00

10.0000 kg Semen / PC a. Rp. 1,402.50 = Rp. 14,025.00

0.0450 Pasir pasang a. Rp. 102,116.67 = Rp. 4,595.25

1.5000 kg Semen warna a. Rp. 6,500.00 = Rp. 9,750.00

0.3500 Tukang batu a. Rp. 46,000.00 = Rp. 16,100.00

0.0350 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 1,785.00

0.6200 Pekerja a. Rp. 35,000.00 = Rp. 21,700.00

0.0300 Mandor a. Rp. 53,000.00 = Rp. 1,590.00

Jumlah = Rp. 127,064.25

Dibulatkan = Rp. 127,064.00

10. PASANGAN LANTAI KERAMIK MOTIF 40x40 Kw. 1 (SNI DT 91-0012-2007-10)

1.0500 Keramik 40x40 Kw. 1 Arwana a. Rp. 53,350.00 = Rp. 56,017.50

10.0000 kg Semen / PC a. Rp. 1,402.50 = Rp. 14,025.00

0.0450 Pasir pasang a. Rp. 102,116.67 = Rp. 4,595.25

1.5000 kg Semen warna a. Rp. 6,500.00 = Rp. 9,750.00

0.3500 Tukang batu a. Rp. 46,000.00 = Rp. 16,100.00

0.0350 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 1,785.00

0.6200 Pekerja a. Rp. 35,000.00 = Rp. 21,700.00

0.0300 Mandor a. Rp. 53,000.00 = Rp. 1,590.00

Jumlah = Rp. 125,562.75

Dibulatkan = Rp. 125,562.00

`

11. PASANGAN LANTAI KERAMIK 40x40 POLOS (SNI DT 91-0012-2007-11)

1.0500 Keramik 40x40 Polos MAS a. Rp. 33,000.00 = Rp. 34,650.00

10.0000 kg Semen / PC a. Rp. 1,402.50 = Rp. 14,025.00

0.0450 Pasir pasang a. Rp. 102,116.67 = Rp. 4,595.25

1.5000 kg Semen warna a. Rp. 6,500.00 = Rp. 9,750.00

0.3500 Tukang batu a. Rp. 46,000.00 = Rp. 16,100.00

0.0350 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 1,785.00

0.6200 Pekerja a. Rp. 35,000.00 = Rp. 21,700.00

0.0300 Mandor a. Rp. 53,000.00 = Rp. 1,590.00

Jumlah = Rp. 104,195.25

Dibulatkan = Rp. 104,195.00

12. PASANGAN LANTAI KERAMIK 20x20 Kw. 1 (SNI DT 91-0012-2007-12)

1.0500 Keramik 20x20 Mulia Kembang a. Rp. 40,333.33 = Rp. 42,350.00

10.4000 kg Semen / PC a. Rp. 1,402.50 = Rp. 14,586.00

0.0450 Pasir pasang a. Rp. 102,116.67 = Rp. 4,595.25

1.6200 kg Semen warna a. Rp. 6,500.00 = Rp. 10,530.00

0.3500 Tukang batu a. Rp. 46,000.00 = Rp. 16,100.00

0.0350 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 1,785.00

0.6200 Pekerja a. Rp. 35,000.00 = Rp. 21,700.00

0.0300 Mandor a. Rp. 53,000.00 = Rp. 1,590.00

Jumlah = Rp. 113,236.25

Dibulatkan = Rp. 113,236.00

m3

1 M2

m2

m3

1 M2

m2

m3

1 M2

m2

m3

1 M2

m2

m3

1 M2

m2

m3

Page 44: Analis 2012 Gedung

44

13. PASANGAN LANTAI MARMER (100 x 100 cm) (SNI DT 91-0012-2007-13)

1.0600 Bh Marmer a. Rp. 500,000.00 = Rp. 530,000.00

8.1900 kg Semen / PC a. Rp. 1,402.50 = Rp. 11,486.47

0.0450 Pasir pasang a. Rp. 102,116.67 = Rp. 4,595.25

0.6500 kg Semen warna a. Rp. 6,500.00 = Rp. 4,225.00

0.3500 Tukang batu a. Rp. 46,000.00 = Rp. 16,100.00

0.0350 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 1,785.00

0.6200 Pekerja a. Rp. 35,000.00 = Rp. 21,700.00

0.0300 Mandor a. Rp. 53,000.00 = Rp. 1,590.00

Jumlah = Rp. 591,481.73

Dibulatkan = Rp. 591,481.00

14 PASANGAN GRANITO (60 x 60 cm) (SNI DT 91-0012-2007-14)

1.0500 Granito 60 x 60 cm a. Rp. 269,500.00 = Rp. 282,975.00

10.0000 kg Semen / PC a. Rp. 1,402.50 = Rp. 14,025.00

0.0450 Pasir pasang a. Rp. 102,116.67 = Rp. 4,595.25

1.5000 kg Semen warna a. Rp. 6,500.00 = Rp. 9,750.00

0.3500 Tukang batu a. Rp. 46,000.00 = Rp. 16,100.00

0.0350 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 1,785.00

0.6200 Pekerja a. Rp. 35,000.00 = Rp. 21,700.00

0.0300 Mandor a. Rp. 53,000.00 = Rp. 1,590.00

Jumlah = Rp. 352,520.25

Dibulatkan = Rp. 352,520.00

PEKERJAAN KUNCI DAN KACA ( SNI K.K )

1. 1 Bh PASANG KUNCI TANAM ( SNI K.K.01 )

1.0000 bh Kunci pegangan besar a. Rp. 49,500.00 = Rp. 49,500.00

0.5000 Tukang kayu a. Rp. 49,000.00 = Rp. 24,500.00

0.0100 Pekerja a. Rp. 35,000.00 = Rp. 350.00

0.0100 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 510.00

0.0050 Mandor a. Rp. 53,000.00 = Rp. 265.00

Jumlah = Rp. 75,125.00

Dibulatkan = Rp. 75,125.00

2. 1 Bh PASANG KUNCI SELOT ( SNI K.K.02 )

1.0000 bh Kunci selot a. Rp. 46,200.00 = Rp. 46,200.00

0.2000 Tukang kayu a. Rp. 49,000.00 = Rp. 9,800.00

0.0200 Pekerja a. Rp. 35,000.00 = Rp. 700.00

0.0200 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 1,020.00

0.0010 Mandor a. Rp. 53,000.00 = Rp. 53.00

Jumlah = Rp. 57,773.00

Dibulatkan = Rp. 57,773.00

3. 1 Set PASANG ENGSEL PINTU ( SNI K.K.03 )

1.00000 set Engsel pintu a. Rp. 10,862.50 = Rp. 10,862.50

0.15000 Tukang kayu a. Rp. 49,000.00 = Rp. 7,350.00

0.01500 Pekerja a. Rp. 35,000.00 = Rp. 525.00

0.01500 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 765.00

0.00075 Mandor a. Rp. 53,000.00 = Rp. 39.75

Jumlah = Rp. 19,542.25

Dibulatkan = Rp. 19,542.00

4. 1 Set PASANG ENGSEL JENDELA ( SNI K.K.04 )

1.00000 set Engsel jendela a. Rp. 8,800.00 = Rp. 8,800.00

0.15000 Tukang kayu a. Rp. 49,000.00 = Rp. 7,350.00

0.01500 Pekerja a. Rp. 35,000.00 = Rp. 525.00

0.01500 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 765.00

0.00075 Mandor a. Rp. 53,000.00 = Rp. 39.75

Jumlah = Rp. 17,479.75

Dibulatkan = Rp. 17,479.00

5. 1 Set PASANG KAIT ANGIN ( SNI K.K.05 )

1.00000 set Kait angin a. Rp. 8,800.00 = Rp. 8,800.00

0.15000 Tukang kayu a. Rp. 49,000.00 = Rp. 7,350.00

0.01500 Pekerja a. Rp. 35,000.00 = Rp. 525.00

0.01500 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 765.00

1 M2

m3

1 M2

m2

m3

Page 45: Analis 2012 Gedung

45

0.00075 Mandor a. Rp. 53,000.00 = Rp. 39.75

Jumlah = Rp. 17,479.75

Dibulatkan = Rp. 17,479.00

6. PASANG KACA POLOS 5 mm ( SNI K.K.06 )

1.10000 m2 Kaca polos a. Rp. 66,000.00 = Rp. 72,600.00

0.15000 Tukang kayu a. Rp. 49,000.00 = Rp. 7,350.00

0.01500 Pekerja a. Rp. 35,000.00 = Rp. 525.00

0.01500 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 765.00

0.00075 Mandor a. Rp. 53,000.00 = Rp. 39.75

Jumlah = Rp. 81,279.75

Dibulatkan = Rp. 81,279.00

7. 1 Bh PASANG REL PINTU DORONG ( SNI K.K.07 )

1.00000 bh Rel Pintu dorong a. Rp. 165,000.00 = Rp. 165,000.00

0.60000 Tukang kayu a. Rp. 49,000.00 = Rp. 29,400.00

0.06000 Pekerja a. Rp. 35,000.00 = Rp. 2,100.00

0.06000 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 3,060.00

0.00300 Mandor a. Rp. 53,000.00 = Rp. 159.00

Jumlah = Rp. 199,719.00

Dibulatkan = Rp. 199,719.00

8. 1 Bh PASANG KUNCI LEMARI ( SNI K.K.08 )

1.00000 bh Kunci lemari a. Rp. 9,000.00 = Rp. 9,000.00

0.25000 Tukang kayu a. Rp. 49,000.00 = Rp. 12,250.00

0.02500 Pekerja a. Rp. 35,000.00 = Rp. 875.00

0.02500 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 1,275.00

0.00125 Mandor a. Rp. 53,000.00 = Rp. 66.25

Jumlah = Rp. 23,466.25

Dibulatkan = Rp. 23,466.00

9 PASANG KACA RAYBAND 5 mm ( SNI K.K.09 )

1.10000 m2 Kaca Rayband 5 mm a. Rp. 77,000.00 = Rp. 84,700.00

0.15000 Tukang kayu a. Rp. 49,000.00 = Rp. 7,350.00

0.01500 Pekerja a. Rp. 35,000.00 = Rp. 525.00

0.01500 Kep. Tukang kayu a. Rp. 51,000.00 = Rp. 765.00

0.00075 Mandor a. Rp. 53,000.00 = Rp. 39.75

Jumlah = Rp. 93,379.75

Dibulatkan = Rp. 93,379.00

PEKERJAAN SANITASI ( SNI S. )

1. 1 Bh MEMASANG KLOSET DUDUK / MONOBLOK ( SNI.S.01 )

1.0000 bh Kloset duduk/monoblok a. Rp. 1,600,000.00 = Rp. 1,600,000.00

1.0000 Perlengkapan (6% harga kloset ) a. Rp. 96,000.00 = Rp. 96,000.00

3.3000 Pekerja a. Rp. 35,000.00 = Rp. 115,500.00

1.1000 Tukang batu a. Rp. 46,000.00 = Rp. 50,600.00

0.0010 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 51.00

0.1600 Mandor a. Rp. 53,000.00 = Rp. 8,480.00

Jumlah = Rp. 1,870,631.00

Dibulatkan = Rp. 1,870,631.00

2. 1 Bh MEMASANG KLOSET JONGKOK PORSELEN ( SNI.S.02 )

1.0000 bh Kloset jongkok porselen a. Rp. 107,387.50 = Rp. 107,387.50

6.0000 kg Semen / PC a. Rp. 1,402.50 = Rp. 8,415.00

0.0100 m3 Pasir pasang a. Rp. 102,116.67 = Rp. 1,021.17

1.0000 Pekerja a. Rp. 35,000.00 = Rp. 35,000.00

1.5000 Tukang batu a. Rp. 46,000.00 = Rp. 69,000.00

1.5000 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 76,500.00

0.1600 Mandor a. Rp. 53,000.00 = Rp. 8,480.00

Jumlah = Rp. 305,803.67

Dibulatkan = Rp. 305,803.00

3. 1 Bh MEMASANG URINOIR ( SNI.S.03 )

1.0000 bh Urinoir a. Rp. 175,000.00 = Rp. 175,000.00

1.0000 Perlengkapan (30% harga urinoir) a. Rp. 52,500.00 = Rp. 52,500.00

6.0000 kg Semen / PC a. Rp. 1,402.50 = Rp. 8,415.00

0.0100 m3 Pasir pasang a. Rp. 102,116.67 = Rp. 1,021.17

1 M2

1 M2

Page 46: Analis 2012 Gedung

46

1.0000 Pekerja a. Rp. 35,000.00 = Rp. 35,000.00

1.0000 Tukang batu a. Rp. 46,000.00 = Rp. 46,000.00

0.1000 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 5,100.00

0.1000 Mandor a. Rp. 53,000.00 = Rp. 5,300.00

Jumlah = Rp. 328,336.17

Dibulatkan = Rp. 328,336.00

4. 1 Bh MEMASANG WASTAFEL ( SNI.S.04 )

1.0000 bh Wastafel a. Rp. 385,000.00 = Rp. 385,000.00

1.0000 Perlengkapan (12% hrg.wastafel) a. Rp. 46,200.00 = Rp. 46,200.00

6.0000 kg Semen / PC a. Rp. 1,402.50 = Rp. 8,415.00

0.0100 m3 Pasir pasang a. Rp. 102,116.67 = Rp. 1,021.17

1.2000 Pekerja a. Rp. 35,000.00 = Rp. 42,000.00

1.4500 Tukang batu a. Rp. 46,000.00 = Rp. 66,700.00

0.1500 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 7,650.00

0.1000 Mandor a. Rp. 53,000.00 = Rp. 5,300.00

Jumlah = Rp. 562,286.17

Dibulatkan = Rp. 562,286.00

5. 1 Bh MEMASANG BAK CUCI PIRING STAINLES STEEL ( SNI.S.05 )

1.0000 bh Bak cuci stainless a. Rp. 180,000.00 = Rp. 180,000.00

1.0000 set Waterdrain + aksesoris a. Rp. 21,600.00 = Rp. 21,600.00

0.0300 Pekerja a. Rp. 35,000.00 = Rp. 1,050.00

0.3000 Tukang batu a. Rp. 46,000.00 = Rp. 13,800.00

0.0300 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 1,530.00

0.0015 Mandor a. Rp. 53,000.00 = Rp. 79.50

Jumlah = Rp. 218,059.50

Dibulatkan = Rp. 218,059.00

6. 1 Bh

1.0000 bh Kran air a. Rp. 30,250.00 = Rp. 30,250.00

0.0250 bh Seal tape a. Rp. 2,500.00 = Rp. 62.50

0.0100 Pekerja a. Rp. 35,000.00 = Rp. 350.00

0.1000 Tukang batu a. Rp. 46,000.00 = Rp. 4,600.00

0.0100 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 510.00

0.0050 Mandor a. Rp. 53,000.00 = Rp. 265.00

Jumlah = Rp. 36,037.50

Dibulatkan = Rp. 36,037.00

6. 1 Bh MEMASANG KRAN AIR WASTAFEL ( SNI.S.06.a )

1.0000 bh Kran Wastafel a. Rp. 50,000.00 = Rp. 50,000.00

0.0250 bh Seal tape a. Rp. 2,500.00 = Rp. 62.50

0.0100 Pekerja a. Rp. 35,000.00 = Rp. 350.00

0.1000 Tukang batu a. Rp. 46,000.00 = Rp. 4,600.00

0.0100 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 510.00

0.0050 Mandor a. Rp. 53,000.00 = Rp. 265.00

Jumlah = Rp. 55,787.50

Dibulatkan = Rp. 55,787.00

7. 1 Bh MEMASANG FLOOR DRAIN ( SNI.S.07 )

1.0000 set Floor drain a. Rp. 15,000.00 = Rp. 15,000.00

0.0100 Pekerja a. Rp. 35,000.00 = Rp. 350.00

0.1000 Tukang batu a. Rp. 46,000.00 = Rp. 4,600.00

0.0100 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 510.00

0.0050 Mandor a. Rp. 53,000.00 = Rp. 265.00

Jumlah = Rp. 20,725.00

Dibulatkan = Rp. 20,725.00

8. 1 Bh MEMASANG BAK MANDI FIBERGLASS ( SNI.S.08 )

1.0000 bh Bak Fiberglass a. Rp. 220,000.00 = Rp. 220,000.00

1.0000 Perlengkapan (18% hrg.bak) a. Rp. 39,600.00 = Rp. 39,600.00

0.0100 Pekerja a. Rp. 35,000.00 = Rp. 350.00

0.1000 Tukang batu a. Rp. 46,000.00 = Rp. 4,600.00

0.0100 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 510.00

0.0050 Mandor a. Rp. 53,000.00 = Rp. 265.00

Jumlah = Rp. 265,325.00

Dibulatkan = Rp. 265,325.00

MEMASANG KRAN AIR f 3/4" atau 1/2" ( SNI.S.06 )

Page 47: Analis 2012 Gedung

47

9. 1 Bh MEMASANG BAK KONTROL PASANGAN BATU BATA (Uk. 30x30 cm tinggi 35 cm) ( SNI.S.09 )

0.1450 Batu bata kw. 2 a. Rp. 733.33 = Rp. 106.33

44.0000 kg Semen / PC a. Rp. 1,402.50 = Rp. 61,710.00

0.0700 Pasir Pasang a. Rp. 102,116.67 = Rp. 7,148.17

0.0700 Batu Kerikil a. Rp. 212,850.00 = Rp. 14,899.50

1.6000 kg Besi beton a. Rp. 9,900.00 = Rp. 15,840.00

0.0600 Pasir Beton a. Rp. 141,710.00 = Rp. 8,502.60

0.0100 Pekerja a. Rp. 35,000.00 = Rp. 350.00

0.1000 Tukang batu a. Rp. 46,000.00 = Rp. 4,600.00

0.0100 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 510.00

0.0050 Mandor a. Rp. 53,000.00 = Rp. 265.00

Jumlah = Rp. 113,931.60

Dibulatkan = Rp. 113,931.00

10. 1 M'

1.2000 m' Pipa PVC a. Rp. 5,954.67 = Rp. 7,145.60

1.0000 Perlengkapan (35% harga pipa) a. Rp. 2,084.13 = Rp. 2,084.13

0.0360 Pekerja a. Rp. 35,000.00 = Rp. 1,260.00

0.0600 Tukang batu a. Rp. 46,000.00 = Rp. 2,760.00

0.0060 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 306.00

0.0018 Mandor a. Rp. 53,000.00 = Rp. 95.40

Jumlah = Rp. 13,651.13

Dibulatkan = Rp. 13,651.00

11. 1 M'

1.2000 m' Pipa PVC a. Rp. 7,065.33 = Rp. 8,478.40

1.0000 Perlengkapan (35% harga pipa) a. Rp. 2,472.87 = Rp. 2,472.87

0.0360 Pekerja a. Rp. 35,000.00 = Rp. 1,260.00

0.0600 Tukang batu a. Rp. 46,000.00 = Rp. 2,760.00

0.0060 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 306.00

0.0018 Mandor a. Rp. 53,000.00 = Rp. 95.40

Jumlah = Rp. 15,372.67

Dibulatkan = Rp. 15,372.00

12. 1 M'

1.2000 m' Pipa PVC a. Rp. 7,970.67 = Rp. 9,564.80

1.0000 Perlengkapan (35% harga pipa) a. Rp. 2,789.73 = Rp. 2,789.73

0.0360 Pekerja a. Rp. 35,000.00 = Rp. 1,260.00

0.0600 Tukang batu a. Rp. 46,000.00 = Rp. 2,760.00

0.0060 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 306.00

0.0018 Mandor a. Rp. 53,000.00 = Rp. 95.40

Jumlah = Rp. 16,775.93

Dibulatkan = Rp. 16,775.00

13. 1 M'

1.2000 m' Pipa PVC a. Rp. 16,552.67 = Rp. 19,863.20

1.0000 Perlengkapan (35% harga pipa) a. Rp. 5,793.43 = Rp. 5,793.43

0.0360 Pekerja a. Rp. 35,000.00 = Rp. 1,260.00

0.0600 Tukang batu a. Rp. 46,000.00 = Rp. 2,760.00

0.0060 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 306.00

0.0018 Mandor a. Rp. 53,000.00 = Rp. 95.40

Jumlah = Rp. 30,078.03

Dibulatkan = Rp. 30,078.00

14. 1 M'

1.2000 m' Pipa PVC a. Rp. 24,802.40 = Rp. 29,762.88

1.0000 Perlengkapan (35% harga pipa) a. Rp. 8,680.84 = Rp. 8,680.84

0.0540 Pekerja a. Rp. 35,000.00 = Rp. 1,890.00

0.0900 Tukang batu a. Rp. 46,000.00 = Rp. 4,140.00

0.0090 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 459.00

0.0027 Mandor a. Rp. 53,000.00 = Rp. 143.10

Jumlah = Rp. 45,075.82

Dibulatkan = Rp. 45,075.00

15. 1 M'

1.2000 m' Pipa PVC a. Rp. 45,945.20 = Rp. 55,134.24

1.0000 Perlengkapan (35% harga pipa) a. Rp. 16,080.82 = Rp. 16,080.82

0.0810 Pekerja a. Rp. 35,000.00 = Rp. 2,835.00

0.1350 Tukang batu a. Rp. 46,000.00 = Rp. 6,210.00

m3

m3

m3

m3

MEMASANG PIPA PVC TIPE AW F 1/2" ( SNI.S.15 )

MEMASANG PIPA PVC TIPE AW F 3/4" ( SNI.S.16 )

MEMASANG PIPA PVC TIPE AW F 1" ( SNI.S.17 )

MEMASANG PIPA PVC TIPE AW F 1 1/2" ( SNI.S.18 )

MEMASANG PIPA PVC TIPE AW F 2" ( SNI.S.19 )

MEMASANG PIPA PVC TIPE AW F 3" ( SNI.S.20 )

Page 48: Analis 2012 Gedung

48

0.0135 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 688.50

0.0041 Mandor a. Rp. 53,000.00 = Rp. 217.30

Jumlah = Rp. 81,165.86

Dibulatkan = Rp. 81,165.00

16. 1 M'

1.2000 m' Pipa PVC a. Rp. 65,924.13 = Rp. 79,108.96

1.0000 Perlengkapan (35% harga pipa) a. Rp. 23,073.45 = Rp. 23,073.45

0.0810 Pekerja a. Rp. 35,000.00 = Rp. 2,835.00

0.1350 Tukang batu a. Rp. 46,000.00 = Rp. 6,210.00

0.0135 Kep. Tukang batu a. Rp. 51,000.00 = Rp. 688.50

0.0041 Mandor a. Rp. 53,000.00 = Rp. 217.30

Jumlah = Rp. 112,133.21

Dibulatkan = Rp. 112,133.00

PEKERJAAN PAVING STONE ( An. Pav. )

1. PAS. PAVING SEGI EMPAT ABU-ABU 6 CM K.200 ( An.Pav.1 )

1.0000 Paving model segi empat a. Rp. 45,100.00 = Rp. 45,100.00

0.0500 Pasir urug a. Rp. 74,250.00 = Rp. 3,712.50

0.2000 Tukang batu a. Rp. 46,000.00 = Rp. 9,200.00

0.4000 Pekerja a. Rp. 35,000.00 = Rp. 14,000.00

Jumlah = Rp. 72,012.50

Dibulatkan = Rp. 72,012.00

2. PAS. PAVING SEGI EMPAT WARNA 6 CM K.200 ( An.Pav.2 )

1.0000 Paving model segi empat warna a. Rp. 50,600.00 = Rp. 50,600.00

0.0500 Pasir urug a. Rp. 74,250.00 = Rp. 3,712.50

0.2000 Tukang batu a. Rp. 46,000.00 = Rp. 9,200.00

0.4000 Pekerja a. Rp. 35,000.00 = Rp. 14,000.00

Jumlah = Rp. 77,512.50

Dibulatkan = Rp. 77,512.00

3. PAS. PAVINGSTONE BETON BLOK ABU-ABU 6 CM K.200 ( An.Pav.3 )

1.0000 Paving beton blok abu abu a. Rp. 45,540.00 = Rp. 45,540.00

0.0500 Pasir urug a. Rp. 74,250.00 = Rp. 3,712.50

0.2000 Tukang batu a. Rp. 46,000.00 = Rp. 9,200.00

0.4000 Pekerja a. Rp. 35,000.00 = Rp. 14,000.00

Jumlah = Rp. 72,452.50

Dibulatkan = Rp. 72,452.00

4. PAS. PAVINGSTONE BETON BLOK WARNA 6 CM K.200 ( An.Pav.4 )

1.0000 Paving beton blok warna a. Rp. 50,600.00 = Rp. 50,600.00

0.0500 Pasir urug a. Rp. 74,250.00 = Rp. 3,712.50

0.2000 Tukang batu a. Rp. 46,000.00 = Rp. 9,200.00

0.4000 Pekerja a. Rp. 35,000.00 = Rp. 14,000.00

Jumlah = Rp. 77,512.50

Dibulatkan = Rp. 77,512.00

5. PAS. PAVINGSTONE BETON BLOK ABU-ABU 8 CM K.300 ( An.Pav.5 )

1.0000 Paving beton blok abu-abu a. Rp. 60,500.00 = Rp. 60,500.00

0.0500 Pasir urug a. Rp. 74,250.00 = Rp. 3,712.50

0.2000 Tukang batu a. Rp. 46,000.00 = Rp. 9,200.00

0.4000 Pekerja a. Rp. 35,000.00 = Rp. 14,000.00

Jumlah = Rp. 87,412.50

Dibulatkan = Rp. 87,412.00

6. PAS. PAVINGSTONE BETON SEGIEMPAT ABU-ABU 6 CM TANPA K ( An.Pav.6 )

1.0000 Paving beton blok segiempat a. Rp. 35,200.00 = Rp. 35,200.00

0.0500 Pasir urug a. Rp. 74,250.00 = Rp. 3,712.50

0.2000 Tukang batu a. Rp. 46,000.00 = Rp. 9,200.00

0.4000 Pekerja a. Rp. 35,000.00 = Rp. 14,000.00

Jumlah = Rp. 62,112.50

Dibulatkan = Rp. 62,112.00

Tuban, Januari 2012

MEMASANG PIPA PVC TIPE AW F 4" ( SNI.S.21 )

1 M2

m2

m3

1 M2

m2

m3

1 M2

m2

m3

1 M2

m2

m3

1 M2

m2

m3

1 M2

m2

m3

Page 49: Analis 2012 Gedung

49

KEPALA BIDANG TATA RUANG DAN PEMUKIMAN

Ir. S A T R I Y O

NIP. 19590405 199003 1 005

Page 50: Analis 2012 Gedung

50

REKAPITULASIANALISA HARGA SATUAN BAHAN DAN UPAH TENAGA

TAHUN ANGGARAN 2012

NO. URAIAN PEKERJAANKODE SATUAN HARGA

ANALISA (Rp.)

1 2 3 4 5

PEKERJAAN PERSIAPAN / SNI 03-2835-2002

1. PENGUKURAN DAN PEMASANGAN BOUWPLANK SNI 03-2835-01 1 M' 92,366.00

2. PEMBUATAN GUDANG SEMEN DAN ALAT-ALAT SNI 03-2835-02 1,195,010.00

3. PAGAR SEMENTARA DARI SENG GELOMBANG t = 2m SNI 03-2835-03 1 M' 455,196.00

4. PEMBERSIHAN LOKASI DAN PERATAAN SNI 03-2835-04 6,150.00

5. PEMBONGKARAN DINDING BATA MERAH SNI 03-2835-05 235,094.00

28,211.00

6. PEMBONGKARAN BETON BERTULANG SNI 03-2835-06 250,994.00

PEKERJAAN TANAH ( SNI DT 91-0006-2007 )

1. GALIAN TANAH s/d 1 M (SNI DT 91-0006-2007-01) 27,575.00

2. GALIAN TANAH s/d 2 M (SNI DT 91-0006-2007-02) 33,885.00

3. GALIAN TANAH s/d 3 M (SNI DT 91-0006-2007-03) 40,301.00

4. GALIAN TANAH BERBATU (SNI DT 91-0006-2007-04) 42,332.00

5. GALIAN TANAH KERAS SEDALAM 1 M (SNI DT 91-0006-2007-05) 36,696.00

6. GALIAN TANAH CADAS SEDALAM 1 M (SNI DT 91-0006-2007-06) 55,680.00

7. GALIAN TANAH LUMPUR SEDALAM 1 M (SNI DT 91-0006-2007-07) 44,385.00

8. URUGAN TANAH KEMBALI (SNI DT 91-0006-2007-08) 8,272.00

9. MENGURUK PONDASI DENGAN PASIR (SNI DT 91-0006-2007-09) 100,130.00

10. MENGURUK DENGAN TANAH (SNI DT 91-0006-2007-10) 86,930.00

11. MENGURUK DENGAN SIRTU (SNI DT 91-0006-2007-11) 133,275.00

12. MENGURUK DENGAN PEDEL (SNI DT 91-0006-2007-12) 90,067.00

13. MEMBUANG TANAH SEJAUH 30 M (SNI DT 91-0006-2007-13) 12,080.00

14. MENGERJAKAN STRIPPING TEBING SETINGGI 1 M (SNI DT 91-0006-2007-14) 2,015.00

1. PASANGAN AANSTAMPENG / BATU KOSONG (SNI DT 91-0007-2007-01) 180,702.00

2. PASANGAN BATU GUNUNG/BRONGKOL 1:3:10 (SNI DT 91-0007-2007-02) 351,634.00

3. PASANGAN BATU GUNUNG/BRONGKOL 1/4Pc : 1Kpr : 4Ps (SNI DT 91-0007-2007-03) 323,552.00

4. PASANGAN BATU GUNUNG/BRONGKOL 1 : 3 (SNI DT 91-0007-2007-04) 519,296.00

5. PASANGAN BATU GUNUNG/BRONGKOL 1 : 4 (SNI DT 91-0007-2007-05) 468,173.00

6. PASANGAN BATU GUNUNG/BRONGKOL 1 : 5 (SNI DT 91-0007-2007-06) 432,756.00

PEKERJAAN DINDING ( SNI DT 90-0009-2007 )1. PASANGAN BATU KUMBUNG 1 BATA 1:3:10 An.D.01 162,263.00

2. PASANGAN BATU KUMBUNG 1 BATA 1 : 4 An.D.02 179,918.00

3. PASANGAN BATU KUMBUNG 1/2 BATA 1:3:10 An.D.03 81,007.00

4. PASANGAN BATU KUMBUNG 1/2 BATA 1:4 An.D.04 87,112.00

5. PASANGAN BATA MERAH 1 : 2 TB. 1 BATA KW. 1 (SNI DT 91-0009-2007-01) 226,471.00

6. PASANGAN BATA MERAH 1 : 2 TB. 1 BATA KW. 2 (SNI DT 91-0009-2007-02) 204,654.00

7. PASANGAN BATA MERAH 1 : 3 : 10 TB. 1 BATA KW. 2 (SNI DT 91-0009-2007-03) 164,554.00

8. PASANGAN BATA MERAH 1 : 3 TB. 1 BATA KW. 1 (SNI DT 91-0009-2007-04) 212,798.00

9. PASANGAN BATA MERAH 1 : 3 TB. 1 BATA KW. 2 (SNI DT 91-0009-2007-05) 190,981.00

10. PASANGAN BATA MERAH 1 : 4 TB. 1 BATA KW. 1 (SNI DT 91-0009-2007-06) 204,027.00

11. PASANGAN BATA MERAH 1 : 4 TB. 1 BATA KW. 2 (SNI DT 91-0009-2007-07) 182,209.00

12. PASANGAN BATA MERAH 1 : 5 TB. 1 BATA KW. 2 (SNI DT 91-0009-2007-08) 177,027.00

13. PASANGAN BATA MERAH 1 : 2 TB. 1/2 BATA KW. 1 (SNI DT 91-0009-2007-09) 109,104.00

14. PASANGAN BATA MERAH 1 : 2 TB. 1/2 BATA KW. 2 (SNI DT 91-0009-2007-10) 98,195.00

15. PASANGAN BATA MERAH 1 : 3 TB. 1/2 BATA KW. 1 (SNI DT 91-0009-2007-11) 102,885.00

16. PASANGAN BATA MERAH 1 : 3 TB. 1/2 BATA KW. 2 (SNI DT 91-0009-2007-12) 91,976.00

17. PASANGAN BATA MERAH 1 : 4 TB. 1/2 BATA KW. 1 (SNI DT 91-0009-2007-13) 99,166.00

18. PASANGAN BATA MERAH 1 : 4 TB. 1/2 BATA KW. 2 (SNI DT 91-0009-2007-14) 88,257.00

19. PASANGAN BATA MERAH 1 : 5 TB. 1/2 BATA KW. 1 (SNI DT 91-0009-2007-15) 96,818.00

20. PASANGAN BATA MERAH 1 : 5 TB. 1/2 BATA KW. 2 (SNI DT 91-0009-2007-16) 85,909.00

21. PASANGAN BATA MERAH 1 : 3 : 10 TB. 1/2 BATA KW. 2 (SNI DT 91-0009-2007-17) 82,152.00

22. PASANGAN DINDING ROSTER/TERAWANG 12X11X24 CM 1 : 3 (SNI DT 91-0009-2007-18) 189,307.00

23. PASANGAN DINDING BATU TEMPEL HITAM (SNI DT 91-0009-2007-19) 108,115.00

24. PASANGAN DINDING BATU PARAS (SNI DT 91-0009-2007-20) 158,028.00

25. PASANGAN BATU PALIMANAN An.D.05 148,146.00

26. PASANGAN BETON ALUR An.D.06 133,828.00

27. PASANGAN BATU CANDI An.D.07 179,203.00

28. PASANGAN BATU SISIR An.D.08 218,528.00

PEKERJAAN PLESTERAN ( Rev. SNI 03-2837-2007 )

1. PLESTERAN 1 : 2 Tebal 1.5 cm (SNI DT 91-0010-2007-01) 31,576.00

2. PLESTERAN 1 : 3 Tebal 1,5 cm (SNI DT 91-0010-2007-02) 28,449.00

3. PLESTERAN 1 : 4 Tebal 1,5 cm (SNI DT 91-0010-2007-03) 26,397.00

4. PLESTERAN 1 : 5 Tebal 1,5 cm (SNI DT 91-0010-2007-04) 25,120.00

5. PLESTERAN 1 : 3 Tebal 2 cm (SNI DT 91-0010-2007-05) 37,715.00

1 M2

1 M2

1 M3

1 M2

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

1 M2

PEKERJAAN PONDASI ( SNI DT 91-0007-2007 )1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

Page 51: Analis 2012 Gedung

51

NO. URAIAN PEKERJAANKODE SATUAN HARGA

ANALISA (Rp.)

1 2 3 4 56. PLESTERAN 1 : 4 Tebal 2 cm (SNI DT 91-0010-2007-06) 34,945.00

7. PLESTERAN 1 : 5 Tebal 2 cm (SNI DT 91-0010-2007-07) 33,277.00

8. PLESTERAN CIPRAT 1 : 2 (SNI DT 91-0010-2007-08) 23,076.00

9. FINISHING SIAR PASANGAN DINDING BATA MERAH (SNI DT 91-0010-2007-09) 13,865.00

10. FINISHING SIAR PASANGAN BATU KALI 1 : 2 (SNI DT 91-0010-2007-10) 29,077.00

11. PEKERJAAN ACIAN (SNI DT 91-0010-2007-11) 17,198.00

PEKERJAAN BETON ( SNI DT 91-0008-2007 )

1. PEKERJAAN BETON RABAT 1:3:5 (SNI DT 91-0008-2007-01) 639,378.00

2. MEMBUAT LANTAI KERJA BETON 1:2:4 (SNI DT 91-0008-2007-02) 630,280.00

3. MEMBUAT BETON BERTULANG 1:2:3 K.100 (SNI DT 91-0008-2007-03) 668,112.00

4. MEMBUAT BETON BERTULANG 1:2:3 K.125 (SNI DT 91-0008-2007-04) 706,676.00

5. MEMBUAT BETON BERTULANG 1:2:3 K.150 (SNI DT 91-0008-2007-05) 736,794.00

6. MEMBUAT BETON BERTULANG 1:2:3 K.175 (SNI DT 91-0008-2007-06) 772,596.00

7. MEMBUAT BETON BERTULANG 1:2:3 K.200 (SNI DT 91-0008-2007-07) 806,447.00

8. MEMBUAT BETON BERTULANG 1:2:3 K.225 (SNI DT 91-0008-2007-08) 832,297.00

9. MEMBUAT BETON BERTULANG 1:2:3 K.250 (SNI DT 91-0008-2007-09) 848,643.00

10. MEMBUAT BETON BERTULANG 1:2:3 K.275 (SNI DT 91-0008-2007-10) 876,647.00

11. MEMBUAT BETON BERTULANG 1:2:3 K.300 (SNI DT 91-0008-2007-11) 885,365.00

12. MEMBUAT BETON BERTULANG 1:2:3 K.325 (SNI DT 91-0008-2007-12) 918,362.00

13. MEMBUAT BETON BERTULANG 1:2:3 K.350 (SNI DT 91-0008-2007-13) 929,715.00

14. BEGESTING UNTUK PONDASI (SNI DT 91-0008-2007-14) 1 M3 916,237.00

15. BEGESTING UNTUK SLOOF (SNI DT 91-0008-2007-15) 1 M3 1,190,613.00

16. BEGESTING UNTUK KOLOM (SNI DT 91-0008-2007-16) 1 M3 2,217,242.00

17. BEGESTING UNTUK BALOK (SNI DT 91-0008-2007-17) 1 M3 2,894,190.00

18. BEGESTING UNTUK LANTAI (SNI DT 91-0008-2007-18) 1 M3 3,137,324.00

19. BEGESTING UNTUK TANGGA (SNI DT 91-0008-2007-19) 2,393,047.00

20. PEMBESIAN DENGAN BESI POLOS (SNI DT 91-0008-2007-20) 10 Kg 113,113.00

21. PEMBESIAN DENGAN BESI ULIR (SNI DT 91-0008-2007-21) 10 Kg 120,043.00

22. PEMBESIAN DENGAN BESI POLOS (SNI DT 91-0008-2007-22) 110 Kg 1,244,248.00

23. PEMBESIAN DENGAN BESI POLOS (SNI DT 91-0008-2007-23) 120 Kg 1,357,362.00

24. PEMBESIAN DENGAN BESI POLOS (SNI DT 91-0008-2007-24) 130 Kg 1,470,475.00

25. PEMBESIAN DENGAN BESI POLOS (SNI DT 91-0008-2007-25) 140 Kg 1,583,589.00

26. PEMBESIAN DENGAN BESI POLOS (SNI DT 91-0008-2007-26) 150 Kg 1,696,702.00

27. PEMBESIAN DENGAN BESI POLOS (SNI DT 91-0008-2007-27) 200 Kg 2,262,270.00

28. PEMBESIAN DENGAN BESI POLOS (SNI DT 91-0008-2007-28) 250 Kg 2,827,837.00

29. MEMBUAT PONDASI BETON BERTULANG K.175 (SNI DT 91-0008-2007-29) 3,046,195.00

30. MEMBUAT PONDASI BETON BERTULANG K.200 (SNI DT 91-0008-2007-30) 3,080,046.00

31. MEMBUAT PONDASI BETON BERTULANG K.225 (SNI DT 91-0008-2007-31) 3,105,896.00

32. MEMBUAT PONDASI BETON BERTULANG K.250 (SNI DT 91-0008-2007-32) 3,122,242.00

33. MEMBUAT SLOOF BETON BERTULANG K.200 UK. 15/15, 15/20 (SNI DT 91-0008-2007-33) 3,467,535.00

34. MEMBUAT SLOOF BETON BERTULANG K.225 UK. 20/25, 20/30 (SNI DT 91-0008-2007-34) 3,606,499.00

35. MEMBUAT SLOOF BETON BERTULANG K.225 UK. 20/40, 30/40 (SNI DT 91-0008-2007-35) 3,719,612.00

36. MEMBUAT SLOOF BETON BERTULANG K.250 UK. 20/25, 20/30 (SNI DT 91-0008-2007-36) 3,622,845.00

37. MEMBUAT SLOOF BETON BERTULANG K.250 UK. 20/40, 30/40 (SNI DT 91-0008-2007-37) 3,735,958.00

38. MEMBUAT KOLOM PRAKTIS BETON BERTULANG K.175 UK. 11/11, 15/15 (SNI DT 91-0008-2007-38) 2,797,381.00

39. MEMBUAT KOLOM BETON BERTULANG K.200 UK. 15/25, 15/30, 20/30 (SNI DT 91-0008-2007-39) 3,611,770.00

40. MEMBUAT KOLOM BETON BERTULANG K.225 UK. 15/25, 15/30, 20/30 (SNI DT 91-0008-2007-40) 3,637,620.00

41. MEMBUAT KOLOM BETON BERTULANG K.225 UK. 20/40, 30/40 (SNI DT 91-0008-2007-41) 4,203,188.00

42. MEMBUAT KOLOM BETON BERTULANG K.250 UK. 20/40, 30/40 (SNI DT 91-0008-2007-42) 4,219,534.00

43. MEMBUAT KOLOM BETON BERTULANG K.225 UK. 30/50, 35/50 (SNI DT 91-0008-2007-43) 4,463,063.00

44. MEMBUAT KOLOM BETON BERTULANG K.250 UK. 30/50, 35/50 (SNI DT 91-0008-2007-44) 4,479,409.00

45. MEMBUAT KOLOM BETON BERTULANG K.225 UK. 30/60, 35/60, 40/70 (SNI DT 91-0008-2007-45) 4,768,755.00

46. MEMBUAT KOLOM BETON BERTULANG K.250 UK. 30/60, 35/60, 40/70 (SNI DT 91-0008-2007-46) 4,785,101.00

47. MEMBUAT RING BALOK BETON BERTULANG K.175 UK. 15/15, 15/20 (SNI DT 91-0008-2007-47) 2,740,391.00

48. MEMBUAT BALOK BETON BERTULANG K.200 UK. 15/20, 15/30, 20/30 (SNI DT 91-0008-2007-48) 3,610,904.00

49. MEMBUAT BALOK BETON BERTULANG K.225 UK. 15/30, 20/30 (SNI DT 91-0008-2007-49) 3,636,754.00

50. MEMBUAT BALOK BETON BERTULANG K.225 UK. 25/40, 30/50 (SNI DT 91-0008-2007-50) 3,976,094.00

51. MEMBUAT BALOK BETON BERTULANG K.250 UK. 25/40, 30/50 (SNI DT 91-0008-2007-51) 3,992,440.00

52. MEMBUAT BALOK BETON BERTULANG K.225 UK. 30/60, 30/70, 30/80 (SNI DT 91-0008-2007-52) 4,541,662.00

53. MEMBUAT BALOK BETON BERTULANG K.250 UK. 30/60, 30/70, 30/80 (SNI DT 91-0008-2007-53) 4,558,008.00

54. MEMBUAT PLAT LANTAI BETON BERTULANG K.225 TB. 10 & 12 CM (SNI DT 91-0008-2007-54) 3,645,207.00

55. MEMBUAT PLAT LANTAI BETON BERTULANG K.250 TB. 10 & 12 CM (SNI DT 91-0008-2007-55) 3,661,553.00

56. MEMBUAT TANGGA BETON BERTULANG K.225 (SNI DT 91-0008-2007-56) 3,725,522.00

57. MEMBUAT TANGGA BETON BERTULANG K.250 (SNI DT 91-0008-2007-57) 3,741,868.00

58. PEMBESIAN DENGAN BESI POLOS (SNI DT 91-0008-2007-58) 225 Kg 2,522,145.00

59. BEGESTING UNTUK PONDASI (MENGECOR PLAT DGN CETAKAN) (SNI DT 91-0008-2007-59) 216,974.00

60. PEMBESIAN DENGAN BESI POLOS (SNI DT 91-0008-2007-60) 43 Kg 486,388.00

61. MEMBUAT PLAT LANTAI DIBAWAH BETON BERTULANG K.175 (BESI 43 KG) (SNI DT 91-0008-2007-61) 1,367,471.00

62. PEMBESIAN DENGAN BESI POLOS (SNI DT 91-0008-2007-62) 61 Kg 673,498.00

63. MEMBUAT PLAT LANTAI DIBAWAH BETON BERTULANG K.175 (BESI 61 KG) (SNI DT 91-0008-2007-63) 1,554,581.00

PEKERJAAN KAYU ( Rev. SNI 03-3434-2007 )

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

1 M2

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

Page 52: Analis 2012 Gedung

52

NO. URAIAN PEKERJAANKODE SATUAN HARGA

ANALISA (Rp.)

1 2 3 4 5BAHAN KAYU MERANTI

1. PASANGAN KUDA-KUDA (SNI DT 91-0011-2007-01) 5,952,187.00

2. PASANGAN GORDENG (SNI DT 91-0011-2007-02) 5,597,575.00

3. (SNI DT 91-0011-2007-03) 65,211.00

4. PASANGAN USUK/RENG BENGKIRAI UNTUK GENTENG BETON & MONIER (SNI DT 91-0011-2007-04) 72,912.00

5. PAS. RANGKA PLAFOND (50X100) Cm KAYU MERANTI (SNI DT 91-0011-2007-05) 80,755.00

6. PAS. RANGKA PLAFOND (60X120) Cm KAYU MERANTI (SNI DT 91-0011-2007-06) 78,121.00

7. PASANGAN KUSEN KAYU MERANTI (SNI DT 91-0011-2007-07) 6,931,078.00

8. PAS. DAUN PINTU / JENDELA KACA POLOS (SNI DT 91-0011-2007-08) 328,810.00

9. PAS. PINTU / JENDELA JALUSI (SNI DT 91-0011-2007-09) 526,673.00

10. PAS. JALUSI MATI KUSEN KAYU MERANTI (SNI DT 91-0011-2007-10) 427,126.00

11. PAS. DAUN PINTU / JENDELA PANIL (SNI DT 91-0011-2007-11) 380,383.00

12. (SNI DT 91-0011-2007-12) 1 M' 66,664.00

13. (SNI DT 91-0011-2007-13) 1 M' 66,677.00

BAHAN KAYU BENGKIRAI

14. PASANGAN KUDA - KUDA EXPOSE (SNI DT 91-0011-2007-14) 10,922,620.00

15. PASANGAN KUDA - KUDA (SNI DT 91-0011-2007-15) 8,784,163.00

16. PASANGAN GORDENG (SNI DT 91-0011-2007-16) 8,429,551.00

17. PASANGAN USUK/RENG BENGKIRAI UNTUK GENTENG PRESS/LOKAL (SNI DT 91-0011-2007-17) 85,242.00

18. PASANGAN USUK/RENG BENGKIRAI UNTUK GENTENG BETON DAN MONIER (SNI DT 91-0011-2007-18) 94,559.00

19. PAS. RANGKA PLAFOND (50X100) Cm BENGKIRAI (SNI DT 91-0011-2007-19) 98,260.00

20. PAS. RANGKA PLAFOND (60X120) Cm BENGKIRAI (SNI DT 91-0011-2007-20) 94,261.00

21. PASANGAN KUSEN KAYU BENGKIRAI KW. I (SNI DT 91-0011-2007-21) 9,887,703.00

22. PASANGAN KUSEN KAYU BENGKIRAI KW.2 (SNI DT 91-0011-2007-22) 9,034,221.00

23. PAS. DAUN PINTU / JENDELA KACA RAYBEN (SNI DT 91-0011-2007-23) 413,290.00

24. PAS. DAUN PINTU / JENDELA KACA POLOS (SNI DT 91-0011-2007-24) 402,290.00

25. PAS. PINTU / JENDELA JALUSI (SNI DT 91-0011-2007-25) 722,620.00

26. PAS. JALUSI MATI KUSEN KAYU BENGKIRAI (SNI DT 91-0011-2007-26) 610,826.00

27. PAS. DAUN PINTU / JENDELA PANIL (SNI DT 91-0011-2007-27) 502,850.00

28. (SNI DT 91-0011-2007-28) 1 M' 102,898.00

29. (SNI DT 91-0011-2007-29) 1 M' 103,582.00

BAHAN KAYU KAMFER

30. PASANGAN KUDA - KUDA (SNI DT 91-0011-2007-30) 8,654,520.00

31. PASANGAN USUK/RENG KAMPER UNTUK GENTENG PRESS/LOKAL (SNI DT 91-0011-2007-31) 87,453.00

32. PASANGAN USUK/RENG KAMPER UNTUK GENTENG BETON DAN MONIER (SNI DT 91-0011-2007-32) 96,520.00

33. PASANGAN KUSEN (SNI DT 91-0011-2007-33) 8,904,578.00

34. PAS. DAUN PINTU / JENDELA KACA RAYBEN (SNI DT 91-0011-2007-34) 431,770.00

35. PAS. DAUN PINTU / JENDELA KACA POLOS (SNI DT 91-0011-2007-35) 420,770.00

36. PAS. DAUN PINTU / JENDELA JALUSI (SNI DT 91-0011-2007-36) 771,900.00

37. PAS. JALUSI MATI KUSEN KAYU KAMPER (SNI DT 91-0011-2007-37) 657,026.00

38. PAS. DAUN PINTU / JENDELA PANIL (SNI DT 91-0011-2007-38) 533,650.00

BAHAN KAYU JATI

39. PASANGAN KUSEN JAYU JATI (SNI DT 91-0011-2007-39) 13,442,078.00

40. PAS. DAUN PINTU / JENDELA KACA KAYU JATI (SNI DT 91-0011-2007-40) 519,610.00

41. PAS. DAUN PINTU / JENDELA JALUSI (SNI DT 91-0011-2007-41) 1,006,140.00

42. PAS. JALUSI MATI KUSEN KAYU JATI (SNI DT 91-0011-2007-42) 876,626.00

43. PAS. DAUN PINTU / JENDELA PANIL KAYU JATI (SNI DT 91-0011-2007-43) 680,050.00

44. (SNI DT 91-0011-2007-44) 1 M' 152,312.00

PEMBUATAN DAUN PINTU LAPIS

45. PINTU DOUBLE TRIPLEK RANGKA KAYU BENGKIRAI (SNI DT 91-0011-2007-45) 387,518.00

46. PINTU DOUBLE TEAKWOOD RANGKA KAYU BENGKIRAI (SNI DT 91-0011-2007-46) 409,440.00

47. PINTU TEAKWOOD DAN LAPIS ALUMINIUM RANGKA BENGKIRAI (SNI DT 91-0011-2007-47) 417,002.00

48. PASANG DINDING PEMISAH DOUBLE TEAKWOOD RANGKA KAYU BENGKIRAI (SNI DT 91-0011-2007-48) 304,628.00

49. PASANG DINDING PEMISAH DOUBLE TRIPLEK RANGKA KAYU BENGKIRAI (SNI DT 91-0011-2007-49) 287,143.00

PEKERJAAN LANGIT-LANGIT ( SNI DT 91-0013-2007 )

1. PASANG ETERNIT (SNI DT 91-0013-2007-01) 19,999.00

2. PASANG CALSIBOARD (SNI DT 91-0013-2007-02) 30,793.00

3. LIST PLAFOND KAYU PROFIL (SNI DT 91-0013-2007-03) 1 M' 12,197.00

PEKERJAAN PENUTUP ATAP ( SNI 03-3436-2002 )

1. PASANGAN GENTENG PRES BIASA/LOKAL (SNI 03-3436-2002-01) 31,207.00

2. PASANGAN BUBUNGAN PRES BIASA (SNI 03-3436-2002-02) 1 M' 48,488.00

3. PASANGAN GENTENG BETON BESAR (SNI 03-3436-2002-03) 41,155.00

4. PASANGAN GENTENG BETON KECIL (SNI 03-3436-2002-04) 43,190.00

5. PASANGAN BUBUNGAN BETON (SNI 03-3436-2002-05) 1 M' 66,605.00

6. PASANGAN GENTENG JATIWANGI ISI 14,5 BJ (SNI 03-3436-2002-06) 83,120.00

7. PASANGAN BUBUNGAN (SNI 03-3436-2002-07) 1 M' 58,740.00

8. PASANGAN GENTENG BETON BESAR BERWARNA (SNI 03-3436-2002-08) 42,640.00

9. PASANGAN BUBUNGAN BETON BERWARNA (SNI 03-3436-2002-09) 1 M' 55,853.00

1 M3

1 M3

PASANGAN USUK DAN RENG GENTENG PRES/LOKAL 1 M2

1 M2

1 M2

1 M2

1 M3

1 M2

1 M2

1 M2

1 M2

PASANG LISPLANK KAYU MERANTI 3/20

PASANG LISPLANK KAYU MERANTI 3/30

1 M3

1 M3

1 M3

1 M2

1 M2

1 M2

1 M2

1 M3

1 M3

1 M2

1 M2

1 M2

1 M2

1 M2

PASANG LISPLANK KAYU BENGKIRAI 3/20

PASANG LISPLANK KAYU BENGKIRAI 3/30

1 M3

1 M2

1 M2

1 M3

1 M2

1 M2

1 M2

1 M2

1 M2

1 M3

1 M2

1 M2

1 M2

1 M2

PASANG LISPLANK KAYU JATI 3/30

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

Page 53: Analis 2012 Gedung

53

NO. URAIAN PEKERJAANKODE SATUAN HARGA

ANALISA (Rp.)

1 2 3 4 510. PASANGAN GENTENG BETON BESAR BERWARNA + COATING (SNI 03-3436-2002-10) 46,600.00

11. PASANGAN BUBUNGAN BETON BERWARNA + COATING (SNI 03-3436-2002-11) 1 M' 64,515.00

12. PASANGAN GENTENG KERAMIK KIA KECIL (SNI 03-3436-2002-12) 119,014.00

13. PASANGAN BUBUNGAN KERAMIK KIA (SNI 03-3436-2002-13) 1 M' 200,228.00

14. PASANGAN GENTENG PRES EXS. KARANGPILANG (SNI 03-3436-2002-14) 67,507.00

15. PASANGAN BUBUNGAN PRES EXS. KARANGPILANG (SNI 03-3436-2002-15) 1 M' 56,210.00

16. PASANGAN ASBES GELOMBANG BESAR (SNI 03-3436-2002-16) 50,761.00

17. PASANGAN ASBES GELOMBANG KECIL (SNI 03-3436-2002-17) 49,510.00

18. PASANG BUBUNG ASBES GELOMBANG BESAR (SNI 03-3436-2002-18) 1 M' 73,822.00

19. PASANG BUBUNG ASBES GELOMBANG KECIL (SNI 03-3436-2002-19) 1 M' 46,819.00

PEKERJAAN BESI DAN ALUMINIUM ( SNI DT 91-0014-2007 )

1. PASANGAN TALANG DATAR / JURAI (SNI DT 91-0014-2007-01) 1 M' 234,467.00

2. PASANGAN TALANG 1/2 LINGKARAN dia. 15 CM (SNI DT 91-0014-2007-02) 1 M' 141,246.00

3. PASANG RANGKA KUDA-KUDA BAJA (SNI DT 91-0014-2007-03) 1 Kg 22,100.00

4. PASANG ROOLING DOOR ALUMINIUM (SNI DT 91-0014-2007-04) 431,000.00

5. PASANG TERALI BESI (SNI DT 91-0014-2007-05) 263,794.00

PEKERJAAN PLITURAN DAN PENGECATAN ( SNI P.C )

1. MENGGOSOK DAN MENDEMPUL KAYU SNI P.C.01 5,614.00

2. PELABURAN BIDANG KAYU DENGAN POLITUR SNI P.C.02 46,770.00

3. PELABURAN BIDANG KAYU DENGAN MELAMIN SNI P.C.02A 130,373.00

4. PELABURAN BIDANG KAYU DENGAN VERNIS SNI P.C.03 20,562.00

5. PENGECATAN KAYU BARU ( 1 LPS PLAMIR + 1 LPS CAT DASAR + 3 LPS CAT PENUTUP ) SNI P.C.04 44,591.00

6. PENGECATAN KAYU BARU ( 1 LPS PLAMIR + 1 LPS CAT DASAR + 2 LPS CAT PENUTUP ) SNI P.C.05 35,373.00

7. PENGECATAN KAYU LAMA ( 1 LPS PLAMIR + 1 LPS CAT DASAR + 1 LPS CAT PENUTUP ) SNI P.C.06 28,898.00

8. MENGIKIS / MENGEROK PERMUKAAN CAT TEMBOK LAMA SNI P.C.07 6,757.00

9. PENGECATAN TEMBOK BARU ( 1 LPS PLAMIR + 1 LPS CAT DASAR + 2 LPS CAT PENUTUP) SNI P.C.08 9,777.00

CAT PARAGON

10. PENGECATAN TEMBOK BARU ( 1 LPS PLAMIR + 1 LPS CAT DASAR + 2 LPS CAT PENUTUP) SNI P.C.09 10,242.00

CAT DECOLITH

11. PENGECATAN TEMBOK LAMA ( 1 LAPIS CAT DASAR + 2 LPS CAT PENUTUP ) SNI P.C.10 7,335.00

12. PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI SNI P.C.11 12,859.00

13. PENGECATAN GENTENG SNI P.C.12 9,885.00

PEK. PENUTUP LANTAI & DINDING ( SNI DT 91-0012-2007 )

1. PASANGAN TEGEL ABU-ABU 20x20 (SNI DT 91-0012-2007-01) 72,976.00

2. PASANGAN DINDING KERAMIK 20x25 Kw. 1 Roman Kembang (SNI DT 91-0012-2007-02) 127,361.00

3. PASANGAN DINDING KERAMIK 20x25 Kw.1 Kobin Motif (SNI DT 91-0012-2007-03) 122,058.00

4. PASANGAN DINDING KERAMIK 20x25 Kw.1 polos (SNI DT 91-0012-2007-04) 113,501.00

5. PASANGAN LANTAI KERAMIK 30x30 Kw. 1 Roman polos (SNI DT 91-0012-2007-05) 109,200.00

6. PASANGAN LANTAI KERAMIK 30x30 Kw. 1 Mulia polos (SNI DT 91-0012-2007-06) 102,215.00

7. PASANGAN LANTAI KERAMIK 30x30 Kw. 1 Motif (SNI DT 91-0012-2007-07) 115,745.00

8. PASANGAN LANTAI KERAMIK 30x30 Kw. 1 Mulia sembur (SNI DT 91-0012-2007-08) 106,794.00

9. PASANGAN LANTAI KERAMIK 40x40 Kw. 1 Platinum Motif (SNI DT 91-0012-2007-09) 127,064.00

10. PASANGAN LANTAI KERAMIK 40x40 Kw. 1 Arwana Motif (SNI DT 91-0012-2007-10) 125,562.00

11. PASANGAN LANTAI KERAMIK 40x40 MAS Polos (SNI DT 91-0012-2007-11) 104,195.00

12. PASANGAN LANTAI KERAMIK 20x20 Kw. 1 (SNI DT 91-0012-2007-12) 113,236.00

13. PASANGAN LANTAI MARMER (100 x 100 cm) (SNI DT 91-0012-2007-13) 591,481.00

14. PASANGAN GRANITO (60 x 60 cm) (SNI DT 91-0012-2007-14) 352,520.00

PEKERJAAN KUNCI DAN KACA ( SNI K.K )

1. PASANG KUNCI TANAM SNI K.K.01 1 Bh 75,125.00

2. PASANG KUNCI SELOT SNI K.K.02 1 Bh 57,773.00

3. PASANG ENGSEL PINTU SNI K.K.03 1 Set 19,542.00

4. PASANG ENGSEL JENDELA SNI K.K.04 1 Set 17,479.00

5. PASANG KAIT ANGIN (CANTOLAN) SNI K.K.05 1 Set 17,479.00

6. PASANG KACA POLOS 5 mm SNI K.K.06 81,279.00

7. PASANG REL PINTU DORONG SNI K.K.07 1 Bh 199,719.00

8. PASANG KUNCI LEMARI SNI K.K.08 1 Bh 23,466.00

9. PASANG KACA RAYBAND 5 mm SNI K.K.09 93,379.00

PEKERJAAN SANITASI ( SNI S. )

1. MEMASANG KLOSET DUDUK / MONOBLOK SNI.S.01 1 Bh 1,870,631.00

2. MEMASANG KLOSET JONGKOK PORSELEN SNI.S.02 1 Bh 305,803.00

3. MEMASANG URINOIR SNI.S.03 1 Bh 328,336.00

4. MEMASANG WASTAFEL SNI.S.04 1 Bh 562,286.00

5. MEMASANG BAK CUCI PIRING STAINLES STEEL SNI.S.05 1 Bh 218,059.00

6. SNI.S.06 1 Bh 36,037.00

7. MEMASANG KRAN AIR WASTAFEL SNI.S.06.a 1 Bh 55,787.00

8. MEMASANG FLOOR DRAIN SNI.S.07 1 Bh 20,725.00

9. MEMASANG BAK MANDI FIBERGLASS SNI.S.08 1 Bh 265,325.00

10. MEMASANG BAK KONTROL PASANGAN BATU BATA (Uk. 30x30 cm tinggi 35 cm) SNI.S.09 1 Bh 113,931.00

11. SNI.S.15 1 M' 13,651.00

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

MEMASANG KRAN AIR f 3/4" atau 1/2"

MEMASANG PIPA PVC TIPE AW F 1/2"

Page 54: Analis 2012 Gedung

54

NO. URAIAN PEKERJAANKODE SATUAN HARGA

ANALISA (Rp.)

1 2 3 4 512. SNI.S.16 1 M' 15,372.00

13. SNI.S.17 1 M' 16,775.00

14. SNI.S.18 1 M' 30,078.00

15. SNI.S.19 1 M' 45,075.00

16. SNI.S.20 1 M' 81,165.00

17. SNI.S.21 1 M' 112,133.00

PEKERJAAN PAVING STONE ( An. Pav. )

1. PAS. PAVING SEGI EMPAT ABU-ABU 6 CM K.200 An.Pav.1 72,012.00

2. PAS. PAVING SEGI EMPAT WARNA 6 CM K.200 An.Pav.2 77,512.00

3. PAS. PAVINGSTONE BETON BLOK ABU-ABU 6 CM K.200 An.Pav.3 72,452.00

4. PAS. PAVINGSTONE BETON BLOK WARNA 6 CM K.200 An.Pav.4 77,512.00

5. PAS. PAVINGSTONE BETON BLOK ABU-ABU 8 CM K.300 An.Pav.5 87,412.00

6. PAS. PAVINGSTONE BETON SEGIEMPAT ABU-ABU 6 CM TANPA K An.Pav.6 62,112.00

Tuban, Januari 2012

KEPALA BIDANG TATA RUANG DAN PEMUKIMAN

Ir. S A T R I Y O

NIP. 19590405 199003 1 005

MEMASANG PIPA PVC TIPE AW F 3/4"

MEMASANG PIPA PVC TIPE AW F 1"

MEMASANG PIPA PVC TIPE AW F 1 1/2"

MEMASANG PIPA PVC TIPE AW F 2"

MEMASANG PIPA PVC TIPE AW F 3"

MEMASANG PIPA PVC TIPE AW F 4"

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2