Post on 28-Feb-2023
REFERENCE LIST
YEAR PROJECT NAME ITEMS SUPPLIEDEND USER DIMENSIONSDESTINATION EPC CLIENT MATERIAL
2019 UP TO 10"FORGED HOCEni, Sonangol P&P, SSI
Fifteen Limited, JV
SAIPEM SAANGOLAAGOGO FIELD Extension
Project
A694 F65
2019 Overall lenght
750mm with 12" 1500
Flange at one end +
10" 1500 Flange at
second end)
RISER EXTENSION
TRANSITION SPOOL
10.6" to 9.6"
Aker BP ASA,
CONOCOPHILLIPS
SKANDINAVIA AS,
LUNDIN NORWAY AS
Subsea 7 Norway ASNorwayAlvheim Replacement Project A694 F60 + Alloy 625
Cladding
2019 up to 12"Bulkhead and test ringsBP p.l.c.SUBSEA 7 (US) LLCMEXICOBP NA KIKA MANUEL A694 F70
2019 OD 251 thru 298mm
- Lenght 1600 thru
2150mm - 10000
PSI/65KSI
FORGED PIPEBPBHGEMAURITANIA &
SENEGAL
BP TORTUE A694 F65
2019 up to 2"FORGED olets: weldoletsPetroleumDevelopmentO
man(PDO)
Special Technical &
Services Tebodin
OmanBURHAN WEST CORE
AREA DEVELOPEMENT
A182F51
2019 UP TO 26"Bulkhead, Forged
anchors, Elbows, pipe,
test rings
ENI ANGOLA SpASAIPEM SAANGOLACABACA PROJECT A694 F65 + inconel
625, API 5L X60
2019 FROM 3/4" TO 2"GE QUICK RELEASE
CLAMPS/HUBS/SEAL
RINGS
TEPCO FUEL & POWER
INC.
JFE ENG.CORP.JAPANCHIBA CCGT PROJECT A182F304/304L
2019 UP TO 24"FLANGE WN, TEST
RING, COMPACT WN
FLANGE, GASKETS
BP EXPLORATION
LIMITED
SAIPEMAzerbaigianCHIRAG CONVENTIONAL
GAS LIFT PRJ FEED
A694 F65, INCONEL
625
2019 Max OD 1760mm,
Finished weight kg
1720 approx
BELLMOUTH PIECES
FOR RISERS + WPQ
RINGS
ENI CORALLUSOTECHNIP
ENGENHARIA -
TECHNIP FRANCE
MozambiqueCORAL SUBSEA
DEVELOPMENT
A694 F65
2019 Anchors-Bulkheads-Tees-
Alloy Rings
LUNDIN NORWAY ASTechnip NorgeNorwayEdvard Grieg Tie Back
Projects
A694 F65 A694
F65+625 Overlay ,
A182 F55, Integral
Alloy 625
2019 up to: weldolets 4",
nipoflangolets 2",
nipolets 1"
FORGED oletsADCO ONSHOREMATRIX
CONSTRUCTION ABU
DHABI
ABU DHABIEPC FOR REPLACEMENT
OF EXISTING POWER
SKIDS FOR CLUSTERS
40-45, BU HASA
A105, A694F52,
A182F51
2019 up to: WELDOLETS
4"
FORGED olets: weldoletsADNOC(ONSHORE),
ABU DHABI
CHINA PETROLEUM
ENGINEERING &
CONSTRUCTION
CORP.(CPECC)
ABU DHABI
(U.A.E.)
EPC of BAB INTEGRATED
FACILITIES PROJECT(BIFP)
ISO 15560-2
A694F60
2019 up to: 12"FORGED Weldolets,
nipolets, nipoflangolets
PDO(PETROLEUM
DEVELOPMENT OMAN)
ARABIAN
INDUSTRIES
OMANFAHUD GAS
COMPRESSION PROJECT
A105, F316
2019 up to: 6"FORGED Weldolets,
nipolets, nipoflangolets
PDO(PETROLEUM
DEVELOPMENT OMAN)
Special technical
Services & Tebodin
LLC
OMANFAHUD OIL GAS
MANIFOLDS
DEVELOPMENT(INTERCON
NECTING OIL LINE)
F51
2019 UP TO 375mm
OUTSIDE DIAM.
FORGED PIPE
CLADDED
GUYANA DEEP WATER
OPERATIONS UK LTD
SBM OFFSHOREGUYANAFPSO LIZA A694 F65 – A182
F51
2019 UP TO 6"VIAR NIP-FLANGED
VIAR WELD
EXXON MOBILSBM OFFSHOREGUYANAFPSO LIZA 2 A105, A350LF2,
A694F52+F65,
A182F51+F53,
F316/316L
2019 UP TO 10"FORGED PIPEEXXON MOBILSBM OFFSHOREGUYANAFPSO LIZA 2 B564 UNS N06625 -
A182 F53
2019 UP TO 375mm
OUTSIDE DIAM.
FORGED PIPE
CLADDED
GUYANA DEEP WATER
OPERATIONS UK LTD
SBM OFFSHOREGUYANAFPSO LIZA 2 A694 F52 - A694 F65
- A182 F51
2019 UP TO 28"FORGED LATERAL TEENORTH OIL COMPANYPTSC -
PETROVIETNAM
VIETNAMGALLAF PROJECT A350 LF2 - A182
F316 - A182 F44
2019 UP TO 6"VIAR NIP-FLANGED
VIAR WELD
ASSEMBLED ORIFICE
FLANGE
ASSEMBLED DRIP RING
NORTH OIL COMPANYPTSC -
PETROVIETNAM
VIETNAMGALLAF PROJECT A350 LF2 +
CLADDING SS316L,
A350 LF2 +
CLADDING
INCONEL 625, A182
F44, A694 F60
REFERENCE LIST
YEAR PROJECT NAME ITEMS SUPPLIEDEND USER DIMENSIONSDESTINATION EPC CLIENT MATERIAL
2019 up to: weldolets 2",
nipoflangolets 1.1/2",
nipolets 1.1/2",cap 2",
tee 2"
FORGED olets and
forged fittings
PetroleumDevelopmentO
man(PDO)
AL HASSAN Eng.
Oman
OmanHaima West CCPS PDO
PROJECT-Oman
A105, F316L, A182
F91,
2019 up to: weldolets 2",
nipoflangolets 1.1/2",
nipolets 1.1/2",cap 2",
tee 2"
FORGED olets and
forged fittings
PetroleumDevelopmentO
man(PDO)
AL HASSAN Eng.
Oman
OmanHaima West CCPS PDO
PROJECT-Oman
A105, F316L, A182
F91,
2019 up to: 2"FORGED Weldolets,
nipoflangolets
PDO(PETROLEUM
DEVELOPMENT OMAN)
PETROLEUM
DEVELOPMENT
OMAN
OMANHanya Accelerated Waterflood
Phase 1B Project
F51
2019 UP TO 18"VIAR-LOCK, HUB BW,
SEAL RING, HUB
SPADE AND SPACER
JSC MOZYR OIL
REFINERY
NEFTECHIMPROEKTBELARUSHEAVY RESIDUE
CONVERSION COMPLEX
PROJECT
A105N CLADDED
STAINLESS STEEL,
A182 F347H, A182
F304, A105N, A182
F5, AISI 4140,
2019 up to: weldolets 2"WeldoletsPetroleumDevelopmentO
man(PDO)
Galfar Engineering &
Contracting Oman
OMANHPG WELL DELIVERY
PROJECT
ISO 15590-2(GRADE
A182F51)
2019 10"FORGED PIPEJIANYUAN COAL
COKING COMPANY LTD
HUALU
ENGINEERING
COMPANY
CHINAJIANYUAN ETHYLENE
GLYCOL PROJECT
B564 UNS N06600
2019 UP TO 16"SPOOL ASSEMBLY
COMPACT FLANGE
NORSOK
SAE FLANGE
STATOIL Petroleum ASSBM OFFSHORENORWAYJOHAN CASTBERG -
TURRET MOORING
SYSTEM
F316L, F51, F55
2019 UP TO 18"VIAR-WELD, VIAR
NIP-FLANGED, VIAR
SWEEP, SWAGE
ENERGEAN OIL & GASTechnipFMCISRAELKARISH GAS
DEVELOPMENT OFFSHORE
PROJECT
A105N, A182 F316L,
A350 LF2, A182 F51,
A694 F65
2019 12"SWEEPOLET 45°EXXONMOBIL ASIA
PACIFIC PTE LTD
CHIYODA
SINGAPORE (PTE)
LIMITED
SINGAPORELS CRUDE PROJECT A182 F347H
2019 5" and 7.5" BASKET
ADAPTORS (5"
finished weight
6100kg, 7.5" finished
weight 8400 kg)
BASKET ADAPTOR
ASSEMBLY
BPTECHNIP FMC
HOUSTON - Subsea 7
USAMAD DOG PHASE 2 -
FLEXIBLES
A694 F60 (5") A694
F70 (7.5") 4130 other
components
2019 20"BUCKLE ARRESTORENI EAST SEPINGGAN
LIMITED
TIMAS SAPURA
OFFSHORE JV
INDONESIAMERAKES DEVELOPMENT
PROJECT
A694 F65
2019 UP TO 18"BARRED TEE
ELBOW BW
TEST RING
ENI EAST SEPINGGAN
LIMITED
TIMAS SAPURA
OFFSHORE JV
INDONESIAMERAKES DEVELOPMENT
PROJECT
A694 F65 + 3mm
CLADDING
INCONEL 625
2019 up to: 10"FORGED Weldolets,
sweepolets,
nipoflangolets
Qatar Gas(Qatargas
Operating Company
Limited)
Mc Dermott Inc,QATARNORTH FIELD
PRODUCTION
SUSTAINABILITY (NFPS)
PROJECT 1
A105, F321, INC 625
2019 Length 5900mm -
Max OD 580mm
Lenght 4100mm -
Max OD 580mm
WM 12-4 PLEM Taper
Stress Joint with 7" HD
flange & 10H62 Grayloc
WM 12-3 PLEM Taper
Stress Joint with 7" HD
flange & 10H62 Grayloc
ShellTechnip FMCGulf of Mexico
USA
Perdido Phase 2 URF A182 F22 + INC625
CLADDING
2019 up to 20"Fittings (elbows &
weldolets) & Test Rings
BPSAIPEMEgyptQUATTAMEYA & ATOLL 4
PROJECT
SA/A182 F53 - A694
F65
2019 up to: weldolets 10",
nipoflangolets 1"
FORGED oletsPDO OmanPetroleum
Development Oman
OMANRABA Waterflood
development
A182F51
2019 up to: nipolets 1",
weldolets 4",
nipoflangolets 1
FORGED olets:
weldolets,
nipoflangolets(API),
nipolets, pipenipple
ADNOC ONSHORE, ABU
DHABI
PETROJET ABU
DHABI
ABU DHABI
(U.A.E.)
RUMAITHA/SHANAYEL
PRODUCTION
RESTORATION
A105, LF2, F316L,
ALLOY 825, INC 625
2019 up to: weldolets 6",
nipoflangolets 2"
FORGED olets:
weldolets, nipoflangolets
PetroleumDevelopmentO
man(PDO)
SNGP stands for Saih
Nihayda Gas Plant
(Oman)
OmanSaih Nihayda Gas Processing
(SNGP), Oman
A182F51
2019 up to: weldolets
3",nipolets 1.1/2",
nipoflangolets 1.1/2"
FORGED oletsPDO OmanTECNICAREUNIDAS
ENGINEERING
OmanSAIH RAWL COMBINED
CYCLE POWER STATION
A105, F316, A182
F91, A182 F53
REFERENCE LIST
YEAR PROJECT NAME ITEMS SUPPLIEDEND USER DIMENSIONSDESTINATION EPC CLIENT MATERIAL
2019 UP TO 10"VIAR LOCK, HUB BW,
HUB BLIND, SEAL RING
IDEMITSU KOSAN Co.
Ltd
PTSC -
PETROVIETNAM
VIETNAMSAO VANG AND DAI
NGUYET DEVELOPMENT
PROJECT
A182 F51, A182 F55,
INCONEL 625
2019 3/4" to 1,1/2"Forg steel fittings + Hub
for Quick release Clamp
YPF Energia ElectricaGE oil & gasargentinaTucuman project A105+A182F304L+F
316L
2019 UP TO 12"ELBOW BW
FLANGE API WN
FLANGE API SWIVEL
ANCHOR FLANGE
SPECIAL REDUCED
TEE
ESSOSUBSEA 7AUSTRALIAWEST BARRACOUTA A694 F65 +
CLADDING
INCONEL 625
2019 9" APIEnd FittingsEsso-BHP Gippsland
Basin Joint Venture
BHGE / Subsea 7AUSTRALIAWEST BARRACOUTA GAS
FIELD E2630
A182 F22 MOD +
INC625 CLADDING /
A182 F316L RINGS
2019 up to: weldolets 12"FORGED olets: weldoletsPetroleumDevelopmentO
man(PDO)
SPECIAL TECHNICAL
SERVICES &
TEBODIN
OmanYibal Rejuvenation Project A182F51
2018 UP TO 12"compact flanges, swivel
and WN, Norsok
Hurricane Energy plc.Drydocks World
LLC/Bluewater Energy
Services
UNITED
KINGDOM
Aoka Mizu FPSO F51 and F52
2018 2”FORGED oletsPDO OmanAL TURKI
ENTERPRISES OMAN
OMANASFOOR WATER
INJECTION PROJECT OMAN
F51
2018 UP TO 6"SOCKOLET-WELDOLET
-NOZZLE-BOSS-PROBE
-LWN FLANGE
NATIONAL
INVESTIMENT
COMMISION OF IRAQ
(NIC)
ENKAIRAQBESMAYA PROJECT PHASE
2
A105N+A182 F 22
CL.1+A182 F11 CL.1
2018 UP TO 12”FLANGE WN, SWIVEL,
BLIND, ELBOW BW,
WELDOLET
PREMIER OIL NATUNA
SEA BV (PONSBV)
PT. TIMAS SUPLINDOINDONESIABISON, IGUANA AND GAJAH
PUTERI DEVELOPMENT
PROJECT
A694 F65 + 3mm
CLADDING
INCONEL 625, A182
F55
2018 Sweepolets 2”branch,
test rings 2” length
250mm
FORGED items,
sweepolet and test ring
Reliance Industries
Limited
J RAY McDERMOTT
SA-MUMBAI
IndiaBLOCK KG-DWN-98/3
(KG-D6) R-CLUSTER FIELD
DEVELOPMENT
A694 F65 and SDSS
F55(UNS S32760)
2018 2.1/16”blind flanges and WN
flanges
Reliance Industries
Limited
J RAY McDERMOTT
SA-MUMBAI
INDIABLOCK KG-DWN-98/3
(KG-D6) R-CLUSTER FIELD
DEVELOPMENT
A182 F55
2018 UP TO 6"VIAR-WELD,
VIAR-SOCK, VIAR-NFG,
FORGED FITTINGS
TALISMAN VIETNAMPTSC -
PETROVIETNAM
VIETNAMCA RONG DO A182 F51, A694 F65
2018 UP TO 16”
(406,40mm)
OUTSIDE DIAM.
FORGED PIPETALISMAN VIETNAMPTSC –
PETROVIETNAM
VIETNAMCA RONG DO PROJECT A694 F65 – A694
F56 – A182 F51
2018 UP TO 20"VIAR-LAT, LATERAL
TEE
MONSANTOJACOBSUSACHARLES PARISH PLANT
EXPANSION - MON 11900
A182 F316, A182
F51
2018 12"BULKHEAD, FLANGE
WN, TEST RING
EXXONMOBIL ASIA
PACIFIC PTE LTD
IMJV (ITP-Interpipe /
McConnell Dowell Joint
Venture)
SINGAPORECRISP PROJECT A694 F65 + 3mm
INCONEL 625
2018 36"x25"WYESOUTHERN COMPANYBENDTECUSACRIST PLANT A182 F22
2018 18.3/4"SPECIAL FORGING
FLANGED
WELLIS MPcD ASWELLIS MPcD ASNORWAYD-00045 PCD 18-3/4” A694 F52, A694 F65
+ 3mm INCONEL
625
2018 UP TO 4"VIAR WELD, VIAR
SOCK, FORGED
FITTINGS
SINOPEC GROUP &
HENGLI GROUP
HENGLI GROUPCHINADALIAN PROJECT MONEL 400
2018 12", 4" - 12"2500,
2"1/16 10K
Forged tees, anchor
flanges, Elbows, Flanges,
Weldolet, WPQ Rings
DEA Norge ASTechnip NorgeNorwayDvalin Subsea Installations A694 F65 - A182 F55
2018 10"-20"SLOTTED BULKHEADS,
PASSIVE ANCHOR
FLANGE, BARRED
REDUCING TEE,
BULKHEADS
Aker BPSubsea 7 Norway ASNorvegiaEN0110 Ærfugl A694 F65 /
CLADDING W/UNS
N06625
REFERENCE LIST
YEAR PROJECT NAME ITEMS SUPPLIEDEND USER DIMENSIONSDESTINATION EPC CLIENT MATERIAL
2018 Elbow,Union,cap and
tee up to 2”;
weldolets up to 6”
branch;
nipoflangolets up to
2”.
FORGED items(forged
fittings)
QATAR
PETROLEUM(QP)
CHINA PETROLEUM
ENGINEERING &
CONSTRUCTION
CORPORATION(CPEC
C)
QATAREPIC FOR REPLACEMENT
OF OLD 3-PHASE TEST
SEPARATORS AT ALL
DEGASSING STATIONS, D
A105N
2018 UP TO 10"FORGED items
Olets(nipoflangolets,
weldolets, nipolets)
QATAR
PETROLEUM(QP)
McDermott Eastern
Hemisphere Ltd.
(MEHL)
QATAREPIC FOR WELLHEAD
TOPSIDES, MANIFOLD
PLATFORM, PS3
MODIFICATIONS, FLOW
LINES AND
A105, LF2, F60,
316L, F51, inc 825
2018 WELDOLET UP TO
18”, LATERAL TEE
and WYE UP TO 28”
WELDOLET,
SOCKOLET, FORGED
FITTINGS, LATERAL
TEES, ECCENTRIC
WYE
GENERAL ELECTRICKIEWITUSAFAIRVIEW A182 F11, A182 F91,
A335 P91
2018 UP TO 6”VIAR-WELD, VIAR
NIP-FLANGED, VIAR
SWEEP
PETROBRASMODECBRAZILFPSO CARIOCA MV30
(SEPHIA)
A694 F65
2018 UP TO 8"VIAR-WELD, VIAR
NIP-FLANGED
PETROBRASMODECBRAZILFPSO CARIOCA MV30
(SEPHIA)
A182 F51, A182 F55
2018 14”BARRED TEESCHINA NATIONAL
OFFSHORE OIL CORP.
(CNOOC)
SBM OFFSHORECHINAFPSO LIUHUA SA694 F65 + SA182
F51
2018 OD 357,80 mmFORGED PIPECHINA NATIONAL
OFFSHORE OIL CORP.
(CNOOC)
SBM OFFSHORECHINAFPSO LIUHUA A694 F65
2018 1/2" 3000SAE FLANGESCHINA NATIONAL
OFFSHORE OIL
CORP(CNOOC)
S.B.M. OFFSHOREP.R.CHINAFPSO LIUHUA A182F51 + A182
F316L
2018 UP TO 6"VIAR NIP-FLANGED
VIAR WELD
EXXON MOBILSBM OFFSHOREGUYANAFPSO LIZA 1 A105, A350LF2,
A694F52+F65,
A182F51+F53,
F316/316L
2018 OD (mm) 219,1/245 -
ID178/198 / L=2000
Forged PipesChevronBHGEAustraliaGorgon Gas A694 F65
2018 weldolets from 2” up
to 6” branch;
nipoflangolets
2”branch, nipolets
from ¾” up to
1”branch, coupling,
bushing, elbow, from
½” up to 1.1/2”
FORGED items
Olets(nipoflangolets,
weldolets, forged fittings)
Al Dhafra Petroleum
Operations Company
Limited(Adnoc-Kadoc)
L&T Hydrocarbon
Engineering Ltd.
(LTHE)
ABU DHABIHALIBA DEVELOPEMENT
PROJECT, Adco
A105, LF2, F65, alloy
825
2018 2"WELDOLETSPDO OMANAL-TURKI
ENTERPRISES LLC
OMANHAWQA PRODUCTION
PHASE 1-PACKAGE 3
A182 F51
2018 UP TO 18”COMPACT FLANGES
WN, COMPACT
FLANGES BLIND,
GASKET, WELDOLETS,
PIPE SLEEVES WITH
CLADDING
TAIF-NKTOYO ENGINEERINGRUSSIAHEAVY RESIDUE
CONVERSION COMPLEX
PROJECT
A182 F347,
INCOLOY 625, A182
F22, A182 F316 +
CLADDING
TUNGSTEN
CARBIDE
2018 UP TO 1" and 14"VIAR-LOCK, HUB BW,
SEAL RING
JSC MOZYR OIL
REFINERY
AXENSBELARUSHEAVY RESIDUE
HYDROCRACKING
COMPLEX PROJECT
A182 F347H, A182
F304, A105N, A182
F5, AISI 4140, A638
GR.660
2018 11,5" x 10" 11,5"x 6"Barred tees, anchor
flanges, Elbows, WPQ
Rings
Statoil, Eni, PetoroSubsea 7 NorwayNorwayJohan Castberg A694
F65+CLADDING
INCONEL 625
2018 elbow, cap, coupling,
union, up to
2”;weldolets and
nipolets up to 3”;
nipoflangolets up to
2”
FORGED items, olets and
forged fittings
PDO OmanSHELL internationalOmanLEKHWAIR COMBINED
CYCLE POWER STATION
A105, F316L,F91
REFERENCE LIST
YEAR PROJECT NAME ITEMS SUPPLIEDEND USER DIMENSIONSDESTINATION EPC CLIENT MATERIAL
2018 WELDOLETS from
2” up to 3” branch,
NIPOFLANGOLETS
from ½”to 1”
WELDOLETS &
NIPOFLANGOLETS
PDO OMANSPECIAL TECHNICAL
SERVICES &
TEBODIN LLC OMAN
OMANLEKHWAIR SHAMMAR,
56T-L13033, Oman
A182 F51
2018 12"SWEEPOLET 45°EXXONMOBIL ASIA
PACIFIC PTE LTD
CHIYODA
SINGAPORE (PTE)
LIMITED
SINGAPORELS CRUDE PROJECT A182 F347H
2018 16", 13 3/4", 12", 11",
9", 8", 4", 2"
Anchor forging; Reducing
Tee; Anchor flange;
Hydrotest cap; Pup-piece;
Long Radius elbow;
Straight tee;
BPSubsea 7Gulf of MexicoMad Dog Phase 2 A694 F65; UNS
N06625; A694 F65 +
Cladding UNS
N06625
2018 UP TO 6"VIAR-WELD,
VIAR-SOCK, VIAR
NIP-FLANGED, TEE SW,
ELBOW SW, SWAGE,
UNION
MALAYSIA LNG SDN
BHD (MLNG)
JGC CORPORATIONMALAYSIAMERCURY REMOVAL UNIT
(MRU) FOR TRAIN 9
A105N, A350 LF2,
A182 F304L, A234
WPB
2018 2.1/16"FLANGE WN APIEQUINORTECHNIP FMCBRASILPEREGRINO PROJECT A694 F65 + 3mm
INCONEL 625
2018 UP TO :weldolets
14”,
NIPOFLANGOLETS
2”, NIPOLETS 2”,
FORGED FITTINGS
2”
WELDOLETS,
NIPOFLANGOLETS AND
FORGED FITTINGS
Hamad International
Airport JET A1 SUPPLY
PROJECT-DOHA
EPIC(QP)QATARQP-Hamad International
Airport (HIA)
A105, F316L
2018 2"Flanges
Concentric Reducer
OneSubseaL&N ScotlandReliance KG D6 A182 F53
2018 3/4" TO 44"VIAR SOCK + VIAR
WELD +
FORG.FITTINGS
CHENIERE ENERGYBECHTEL OIL GAS
AND CHEMICALS,
INC. (BOGCI)
USASABINE PASS LNG A105N+A350LF2cl.1
+A106/B+A333/6
2018 UP TO 4"Elbow,Union,cap and tee,
nipolets and weldolets,
nipoflangolets
PDO OMAN(Petroleum
Development Oman)
Bahwan Engineering
Company.
OMANSaih Rawl combined cycle
power plant station project.
A105, A182 F316,
A182 F55
2018 WELDOLETS FROM
2” UP TO 4”
FORGED items Olets ISO
15590-2
Salalah-Oman Oil
Facilities Development
Company LLC (OOFDC)
SALALAH LPG SFZ
CO, OMAN
OMANSALALAH LPG A694F65(ISO
15590-2)
2018 UP TO 1"HUB BW, HUB BLIND,
VIAR LOCK, SEAL RING,
FLG WN API 1.13/16” ,
VIAR-LOCK up to 1.1/2”
,VIAR LOCK 3/4” NPT
Female, VIAR SWEEP 1”
IDEMITSU KOSAN Co.
Ltd
PTSC -
PETROVIETNAM
VIETNAMSAO VANG AND DAI
NGUYET DEVELOPMENT
PROJECT
A182 F51
2018 10"Forged pipeKOREA MIDLAND
POWER
CO.,LTD(KOMIPO)
DAELIMKOREAShin-Seo-Cheon A335 P92
2018 up to: WELDOLETS
24”, sweepolets 24”
FORGED olets:
weldolets, sweepolets
Saline Water Conversion
Corporation (SWCC)
RTCC( Al-Rashid
Trading & Contacting
Company)
SAUDI ARABIAShoaiba Desalination Plants,
phase 3-Mina Line B Water
Transmission system
A105, A694F65
2018 12"Plet Anchor flangeStatoilSubsea 7 NorwayNorwaySnefrid Norge A694
F65+CLADDING
INCONEL 625
2018 FROM 1/2" TO 12"FORG.FITTINGS+VIAR
LET+VIAR SOCK+VIAR
THRD
SCIP - AZERBAJAN -
MINISTRY OF ECONOMY
TECNICAL REUNIDASAZERBAJANSOCAR POLYMER CARBON
STEEL-LOW CARB
STEEL-ALLOY
STEEL-STAINLESS
STEEL
2018 2"Cushion Tee
Reducing Tee
Murphy Oil CompanySubsea 7Subsea Pump Station A694 F70
2018 3/8" TO 2"HUB FOR VIAR-LOCK
CLAMP, VIAR WELD,
VIAR THREAD, VIAR
LAT
INDONESIA POWERGE, MARUBENI AND
HUTAMA KARYA
CONSORTIUM
INDONESIATAMBAK LOROK COMB.
CYCLE POWER PLANT
BLOCK 3
A105+A182F304/304
L+A312TP304/304L
2018 10"Piggable WyeHusky Energy Inc.Technip FMC CanadaCanadaWest White Rose A182 F51
REFERENCE LIST
YEAR PROJECT NAME ITEMS SUPPLIEDEND USER DIMENSIONSDESTINATION EPC CLIENT MATERIAL
2018 6", 8", 12"Anchor flanges and WPQ
Rings
Wintershall, Capricorn,
Bayerngas, Edison
Subsea 7 NorwayNorwayWintershall Nova A694
F65+CLADDING
INCONEL 625
2018 Nipolets 1.1/2”,
nipoflangolets 1.1/2”
FORGED olets: nipolets,
nipoflangolets
PDO OmanPetrofac InternationalOmanYIBAL KHUFF
REJOVENATION PROJECT
OMAN
F51
2018 UP TO 2"items WELDOLETS, and
nipoflangolets
PDO OMANSpecial technical
Services & Tebodin
LLC
OMANYibal Rejuvenation Project A182 F316 & A105
2018 FROM 1" TO 2"QUICK RELEASE
CLAMP-SEAL RING
TEPCO Fuel % Power
Inc.
TOSHIBAYOKOHAMA
JAPAN
YOKOHAMA THERMAL
POWER STATION UNIT 4 AT
GROUP 8
A638 Gr660 MoS2
COATED
2018 FROM 1" TO 5"FORG.ROD + NOZZLESPOLISH ELECTRICA
UTILITY CO. PGNiG
TERMIKA
MHPSPOLONIAZERAMN CARBON
STEEL-ALLOY
STEEL
2018 UP TO 12”FORGED BOSS + BOSS
TEMPERATURE +
REINFORCED BRANCH
FITTINGS
PGNiG TERMIKAILF ENG. GROUPPOLANDZERAN CCGT PROJECT EN 10222/2
P280GH-X10CrMoV
Nb9-1
2018 UP TO 26"FORGED BOSS, BOSS
TEMPERATURE,
REINFORCED BRANCH
FITTINGS & FLAT END
PGNiG TERMIKAILF ENG. GROUPPOLANDZERAN CCGT PROJECT EN 10222/2
P280GH-X10CrMoV
Nb9-1
2018 UP TO 4", UP TO
11", UP TO 1 11/16",
UP TO 16" -
STRESS JOINTS
L=8500mm
SWEEPOLET, TEE,
BARRED TEE , WYE 11",
WN FLANGE, MQC
PLATE MANIFOLD,
ANCHOR FLANGE,
J-LAY COLLARS, J-LAY
COLLAR AND STRESS
JOINTS
TOTAL E&P ANGOLASUBSEA 7
ENGINEERING
LIMITED
ANGOLAZINIA PHASE 2 PROJECT INCONEL UNS
N06625, A694 F65,
A182 F55
2017 UP O 3"VIAR WELDPDO Oman(PETROLEUM
DEVELOPEMNT OMAN)
Special Technical
Services & Tebodin
LLC (STST)
OMAN"56T-L11320 Greater Taliah
Surface Development
Phase-2, Oman"
INC 825
2017 18"BEND STIFFENER
ANCHOR
MABRUK OIL
OPERATIONS
TECHNIP FMC U.K.LYBIAAL JURF FLEXIBLE PIPE
REPLACEMENT PROJECT
A694 F52
2017 UP TO 3"VIAR THREAD BSPTMINISTRY OF HEALTH
KWT
SHAPOORJI
PALLONJI & CO. LTD -
DUBAI
KUWAITAL SABAH HOSPITAL
PROJECT KWT
A105N
2017 3/4"VIAR LOCKKNPCHYUNDAI
ENGINEERING &
CONSTRUCTION CO.
LTD
KUWAITAL-ZOUR REFINERY
PROJECT
A182 F316L, B564
UNS N08825
2017 UP TO 14"
UP TO 1.1/2"
VIAR WELD
VIAR NIP
KNPCTECNICAS REUNIDASKUWAITAL-ZOUR REFINERY
PROJECT
A105, A350 LF2,
A182 F316L, F304L,
F321, F11, F317L, F5
2017 12"VIAR SWEEPNIPIGAZLINDE ENGINEERINGRUSSIAAMUR GPP01 A182 F304l
2017 UP TO 14"
UP TO 2"
UP TO 2"
TARGET TEE
VIAR WELD
FORGED FITTING
EXXONMOBIL PNG LTD.WOOD GROUPPAPUA NUOVA
GUINEA
ANGORE SURFACE
FACILITIES & PIPELINE
PROJECT
A350LF2, A182 F51
2017 UP TO 14""VIAR WELD
VIAR THREAD "
SALHIA REAL ESTATE
CO.
PAN ARAB
CONSULTING
ENGINEERING KWT
KUWAITASSIMA AVENUES
PROJECT
A105N
2017 TO 16"VIAR WELD & VIAR
THREAD
MABANEE (AL RAI REAL
ESTATE CO.)
SALHIA REAL ESTATE
CO./PACE ENG.
KUWAITASSIMA TOWER A105
2017 UP TO 12"NOZZLE AT DWGCAPCO CONSORTIUMNOOTER/ERIKSENCHINABLACK POINT POWER
STATION
A105N, A182 F91
2017 10"TARGET TEEBP TRINIDAD AND
TOBAGO
McDERMOTT
INTERNATIONAL INC.
TRINIDAD AND
TOBAGO
BPTT ANGELIN GAS
DEVELOPMENT PROJECT
A350 LF2, A182 F55
2017 8", 7", 6", 2"Anchor Forging
Reducing Tee
LLOGSubsea 7BWOLF, Red Zinger &
Claiborne
A694 F65
REFERENCE LIST
YEAR PROJECT NAME ITEMS SUPPLIEDEND USER DIMENSIONSDESTINATION EPC CLIENT MATERIAL
2017 UP TO 20"SPECIAL FORGED PIPE
VIAR WELD, VIAR
SOCK, FLANGE WN,
BARRED TEE
CHENIERE ENERGY
INC.
BECHTEL OIL AND
GAS CHEMICAL INC
(BOGCI)
USACORPUS CHRISTI LNG
PROJECT STAGE 2
A105N, A182
F304/304L, A182
F316/316L,
A350LF2,
A106B-A312
TP304/304L,
A234WPB,
2017 11"WN FLANGE API 10000SHELLSUBSEA 7U.S.A.COULOMB TC-1066 A694 F65
2017 30" x 24"WYE PIECESFARAB CO.AMERICAN OFOGH
COMPANY (AOC)
IRANDALAHOO B.O.O.
COMBINED CYCLE POWER
PLANT
F91
2017 UP TO 24"
UP TO 28"
WN FLANGE
SWIVEL FLANGE
BLIND FLANGE
FORGED BULKHEAD
CNOOCCOOEC (CHINA
OFFSHORE OIL
ENGINEERING CO.)
CHINADETAIL DESIGN OF PL 19-3
OIL FIELD 1/3/8/9
A694 F65
2017 UP TO 18"VIAR WELDBLUE STAR
ENGINEERING QATAR
ENERGY ZONE (FOR
2022) FOUNDATION
QATAR
QATARENERGY CENTER AT AL
BAYT STADIUM ASPIRE
ZONE AL KHOR CITY
A105N
2017 6"ANCHOR FLANGEABU DHABI OIL CO. LTD
(ADOC)
TARGET
ENGINEERING
CONSTRUCTION CO.
(LLC)
ABU DHABIEPC FOR CAUSEWAY
PIPELINES PROJECT
A694 F60
2017 20"WN FLANGEQATAR PETROLEUMOFFSHORE OIL
ENGINEERING CO.
LTD.
QATAREPCI FOR WHP-3 NFA
COMPLEX
A694 F65 WITH
CLAD INCONEL 625
2017 20"x12"LATERAL TEEESSO AUSTRALIA PTY
LTD
WOOD GROUP PSNAUSTRALIAESSO RETROFIT PROJECT A350 LF2
2017 TO 6"LATERAL EQUAL TEESFARABI YANBU SAUDI
ARABIA
L & T Hydrocarbon
Engineering Ltd.
(LTHE)
YANBU
INDUSTRIAL
AREA
FARABI Normal Paraffin &
Derivates Complex
A105 (A234WPB)
2017 UP TO 4"VIAR WELD, VIAR
SOCK, VIAR
THRED,FORGED
FITTINGS, TEE,
COUPLING, ELBOW 45°
& 90° , PIPE NIPPLE,
CONCENTRIC SWAGE
NIPPLE, ECCENTRIC
SWAGE NIPPLE
FARABI YANBU SAUDI
ARABIA
L&T Hydrocarbon
Engineering Ltd.
(LTHE)
Yanbu Industrial
Area, Saudi
Arabia
FARABI Normal Paraffin &
Derivatives Complex
A105, F11, F22,
F316L, F304L, F347
2017 UP TO 355mm
OUTSIDE DIAM.
FORGED PIPE
CLADDED
GUYANA DEEP WATER
OPERATIONS UK LTD
SBM OFFSHOREGUYANAFPSO LIZA A694 F65 +
CLADDING
INCONEL 625 –
B564 UNS N06625
2017 UP TO 375mm
OUTSIDE DIAM.
FORGED PIPEGUYANA DEEP WATER
OPERATIONS UK LTD
SBM OFFSHOREGUYANAFPSO LIZA A694 F65 – A182
F51
2017 UP TO 6"
UP TO 2"
UP TO 16"
UP TO 16"
VIAR WELD
VIAR NIP-FLANGED
VIAR LOCK
BARRED TEE
GUYANA DEEP WATER
OPERATION UK
SBM OFFSHOREGUYANAFPSO LIZA DESTINY A105, A694 F52,
A694 F65, AIAI4140,
A320 L7M, A182
F51, A182 F53
2017 UP TO 30"FORGED NOZZLETENGIZCHEVROILKPJVKAZAKHSTANFUTURE GROWTH
PROJECT
SA 266M Gr2
2017 UP TO 18"
UP TO 18"
UP TO 22"
4"
4"
UP TO 18"
UP TO
UP TO 8"
UP TO 2"
WN FLANGE
FORGED BARRED TEE
ECCENTRIC REDUCER
TARGET TEE WITH
BLIND HUB AND CLAMP
CONNECTION
VIAR LOCK
HANGER FLANGE
VIAR NIP-FLANGED
VIAR WELD
FORGED FITTINGS
CARIGALI-PTTEP
OPERATING COMPANY
SDN BHD (CPOC)
CUELTHAILAND/
MALAYSIA
JDA BLOCK B-17-01 FIELD
DEVELOPMENT PROJECT
PHASE 4
A694 F65, A182 F51,
AISI 4140
2017 UP TO 24"
UP TO 24"
VIAR BLIND HUB
SEAL RING
VIAR CLAMP
VIAR LOCK
TOTAL EXPLORATION
PRODUCTION ANGOLA
SAIPEM S.A.ANGOLAKAOMBO SURF PROJECT,
BLOCK 32
A694 F60, AISI 4140
PTFE, A182 F316,
B564 UNS N06625
REFERENCE LIST
YEAR PROJECT NAME ITEMS SUPPLIEDEND USER DIMENSIONSDESTINATION EPC CLIENT MATERIAL
2017 UP TO 1.1/2"
UP TO 8"
VIAR NIP-FLANGED
VIAR WELD
PETROLEUM
DEVELOPMENT OF
OMAN (PDO)
SHELL- PDOOMANKHULUD GAS
DEVELOPMENT PROJECT
OMAN - OFF PLOT
A182 F51
2017 UP TO 16"TRANSITION JOINTS
FORGED ANCHORS
WYE STRESS JOINT
CHAIN STOPPERS
BARRED TEES
ELBOWS
STRAIGHTPIPING
EXXON MOBILSAIPEM LIMITED
(U.K.)
GUYANALIZA EPC3 PROJECT A694 F65/ A694 F65
WITH CLAD
INCONEL 625
2017 20"x6"
20"x12"
LATERAL TEE 45°PETROLEUM
DEVELOPMENT OMAN
(PDO)
BAHWAN
ENGINEERING
COMPANY LLC
OMANMARMUL RATIONALISATION
PROJECT
ASTM A234 WPB
2017 UP TO 1.1/2"FORGED FITTINGSKNPCKUWAIT NATIONAL
PETROLEM
COMPANY (KNPC)
KUWAITMINA AL-AHMADI REFINERY A182 F11, B564 UNS
N08825
2017 UP TO 8"HEADER FORGED
NOZZLE
PT PLN PERSERODOOSAN HEAVY
INDUSTRY
INDONESIAMUARA TAWAR PLANT
PROJECT
A182 F11, A182 F22
2017 UP TO 3"
UP TO 6"
FORGED FITTINGS
VIAR SOCK/WELD
EUROCHEM GROUP AGTECNIMONT SPARUSSIANH3 Kingisepp (RU) EPC A350 LF2, A182
F304/304L, A182
F316L, A182 F304H,
A182 F11 CL.2, A182
F22 CL.3
2017 3", 12"VIAR LOCK
FORGED 30°
SYMMETRICAL
PIGGABLE WYE
PTTEPTHAI NIPPON STEEL
& SUMIKIN
ENGINEERING &
CONSTRUCTION
CORP. LTD.
THAILANDPTTEP - BUNDLED PHASE 2
EPCI OF WELLHEAD
PLATFORM, PIPE LINE AND
TIE-INS
AISI 4130, A182 F51,
INCONEL X750
,A694 F60
2017 UP TO 2"
UP TO 2"
UP TO 2"
UP TO 2"
VIAR WELD, VIAR
SOCK
VIAR LAT
FORGED FITTINGS
SPECIAL PIECES
IEM S.A.SK ENGINEERING &
CONSTRUCTION
CHILERED DRAGON/PIEM
PROJECT
A105, A182 F316L,
A182 F11, A182 F22,
A182 F91, 16MO3
2017 8"
2"
UP TO 2"
VIAR WELD
VIAR SOCK
FORGED FITTINGS
EXXONMOBIL ASIA
PACIFIC LTD.
AMEC FOSTER
WHEELER
SINGAPORESINGAPORE LUBES
EXPANSION PROJECT 2
A182 F316L, A182
F22, B564 UNS
N08825
2017 10"
UP TO 4"
VIAR WELD
VIAR LAT
RELIANCE INDUSTRIES
LTD
BLACK & VEATCH
CORPORATION
INDIATAIL GAS TREATING UNIT
DTA REFINERY
A105N
2017 UP TO 16"
UP TO 1.1/2"
UP TO 16"
UP TO 4"
VIAR WELD
VIAR SOCK
VIAR LAT
VIAR ELB
PETROPERU'TECNICAS REUNIDASPERU'TALARA REFINERY
PROJECT
A105, A350 LF2,
A182 F304L, F5, F9,
F22
2017 UP TO 8"
UP TO 3"
VIAR WELD
VIAR SWEEP-INLET
BP BERAU LTDCSTS (CHIYODA,
SAIPEM,TRIPATRA,
SAE)
INDONESIATANGGUH EXPANSION
PROJECT - LNG EPC
A105, A350 LF2,
A182 F51, A182
F316L, F304L
2017 UP TO 3/4"FORGED FITTINGSAMREF CO. LTD -
AMEC FOSTER
WHEELER
BIH BOUSTEAD
INTERNATIONAL
HEATERS LTD
SAUDI ARABIAWASTE HEAT BOLIER
(11-E-26)
A105N, A182 F316L
2017 UP TO 2"
UP TO 2"
VIAR WELD
FORGED FITTING
EXXON MOBIL IRAQKENTZ/SNC-LAVALIN
GROPU
IRAQWEST QURNA 1, INITIAL OIL
TRAIN PROJECT
A105N
2016 UP TO 2"
UP TO 1"
VIAR WELD
VIAR NIP
ABU DHABI ADCOMAIRE TECNIMONTU.A.E.AL DABBI'IYA SURFACE
FACILITIES PHASE III
A105, A350 LF2,
A182 F316L, B564
UNS N08825
2016 12"HANGER FLANGEADMA-OPCONPCCU.A.E.AL YASAT BU HASEER
FIELD DEVELOPMENT
A694 F65
2016 UP TO 20"
20"
20"
20"
BARRED TEE
ANCHOR FLANGE
J-LAY COLLAR
BUCKLE ARRESTOR
PHARAONIC
PETROLEUM COMPANY
(PHPC)
SUBSEA 7 WEST
AFRICA SAS
EGYPTATOLL FIELD
DEVELPOMENT PROJECT
A694 F65, A694 F65
WITH CLAD
INCONEL 625
2016 UP TO 14"
UP TO 14"
UP TO 20"
SWIVEL RING FLANGE
WN AND BLIND
FLANGE
FORGED BULKHEAD
CNOOCCOOEC (CHINA
OFFSHORE OIL
ENGINEERING CO.)
CHINACHENGBEI OIL FIELD
MODIFICATION PRJ
A694 F65
REFERENCE LIST
YEAR PROJECT NAME ITEMS SUPPLIEDEND USER DIMENSIONSDESTINATION EPC CLIENT MATERIAL
2016 UP TO 1"FORGED FITTINGSRASGAS COMPANY
LIMITED
GALFAR AL MISNADQATARCO2 INJECTION & EXPORT
TIE-INS PROJECT
(RGCP-606)
A105, A182 F316L
2016 3"VIAR WELDRAS GASMC DERMOTT M.E.QATARD6938-RASGAS BARZAN
PIPELINE REPAIR
SB/B564 UNS
NO6625
2016 3/4"VIAR NIP-FLANGEDRASGAS QATARMC DERMOTT
MIDDLE EAST
QATARFLOW ASSURANCE
EXPANSION PROJECT
A105, A182 F316,
B564 UNS N06625
2016 7.1/16"/ 8"/9"SWIVEL FLANGES API
10000
PETROBRASCOSCOBRAZILFPSO P75-P77 CESSAO
ONEROSA
ASTM A522 TYPE I,
ASTM A522 TYPE I
WITH INCONEL 625
ON GROOVE
2016 8"
8"
NORSOK COMPACT
FLANGE BLIND
SPECIAL NORSOK
FLANGE OUTER
ESSO EXPLORATION
ANGOLA
SBM OFFSHOREANGOLAFPSO SAXI BATUQUE
PROJECT SW33570
"A182F51 , A350LF2
CL.1 "
2016 42"ANCHOR FLANGEGASCO (ABU DHABI
GAS INDUSTRIES LTD)
NPCCU.A.E.GASCO IGD-E PHASE I,
OFFSHORE PIPELINE, PRJ
5279
A694 F65
2016 16"
UP TO 16"
16"
2.1/2"
1.1/16"
FORGED BARRED TEE
FORGED ELBOW
PLET BULKHEAD
VIAR SWEEP-INLET
VIAR SWEEP-FLANGE
API 10000
WOODSIDE ENERGY
LTD
WOODSIDE ENERGY
LTD
AUSTRALIAGREATER WESTERN
FLANK 2 (GWF-2)
ISO 15590-2 / ISO
15590-3 GR.450
UNS N06625
CLADDING 6mm,
B564 UNS N06625
2016 UP TO 16"
UP TO 2"
UP TO 2"
VIAR WELD
VIAR SOCK
FORGED FITTING
PANDA POWERS
FUNDS
BECHTEL OIL GAS
AND CHEMICALS,
INC.
U.S.A.HUMMEL STATION
PROJECT
A105, A182 F91,
A182 F22
2016 1"
UP TO 12"
HEADERS FORGINGS
NOZZLE AT DWG
SPECIAL O'LET
OMAN POWER AND
WATER PROCUREMENT
COMPANY
SEPCO IIISULTANATE OF
OMAN
IBRI - SOHAR III PROJECT A182 F91, A105
2016 UP TO 12"SPECIAL O'LET AT
DWG
SONELGAZDAELIM INDUSTRIAL
CO. LTD.
ALGERIAKAIS PROJECT A105N, A182 F11,
F22, F91
2016 UP TO 12"PULLING VERTEBRAE
ASSEMBLY
TOTAL EXPLORATION
PRODUCTION ANGOLA
TECHNIP FRANCEANGOLAKAOMBO SURF PROJECT,
BLOCK 32
A694 F65, A694 F52,
S235KL-40, S235
KL-20, S355 KL-40
2016 UP TO 2"
UP TO 1"
VIAR WELD
FORGED FITTINGS
KUWAIT OIL COMAPNYPETROFACKUWAITLOWER FARS HEAVYOIL
DEVELOPMENT
A182 F316L, A182
F55
2016 2"
36"x20"
VIAR WELD
BW REDUCED TEE
PETROLEUM
DEVELOPMENT OMAN
(PDO)
WORLEY PARSONSOMANMABROUK DEEP PHASE-3 A182 F51, A815
UNS 31803
2016 UP TO OD 880mm x
L=1130mm
FORGED PIPEPANDA POWER
FOUNDS
BECHTEL OIL GAS
AND CHEMICALS,
INC.
U.S.A.MATTAWOMAN PROJECT A182 F91 , A105N
2016 UP TO 16.3/4”SWIVEL FLANGE API
10000#
PETROBRASSEMBCORP MARINE
ENGINEERING
BRAZILPETROBRAS P-68 (FPSO) A694 F65 WITH
3mm CLAD
INCONEL 625,
ASTM A522 TYPE I
2016 UP TO 12"SWIVEL FLANGES API
10000
PETROBRASGUARA BVBRAZILPRESALT-FPSOS-P66 AISI 4130 WITH
INCONEL 625
CLADDING
GROOVE
2016 1" - 3"
18"
VIAR LOCK
WN FLANGE & SWIVEL
RING FLANGE
PTTEPTHAI NIPPON STEEL
& SUMIKIN
ENGINEERING &
CONSTRUCTION
CORP. LTD.
THAILANDPTTEP - BUNDLED PHASE 2
EPCI OF WELLHEAD
PLATFORM, PIPE LINE AND
TIE-INS
AISI 4130, AISI 4140,
A182 F51, INCONEL
X750 , A694 F60
2016 6"VIAR LOCKOPHIR THAILAND
(BUALUANG) LIMITED
TECHNIP
ENGINEERING
THAILAND
THAILANDPW DEBOTTLENECKING
PROJECT
AISI 4140 HDG,
A105
2016 UP TO 48"
UP TO 16"
LATERAL TEE BW 45°
REDUCING TEE BW
HIGH PRESSURE TEE
AT DWG
PETROLEUM
DEVELOPMENT OMAN
LLC (PDO)
PETROFAC OMANOMANRABAB HARWELL
INTEGRATED PRJ
(ON-PLOT/OFF-PLOT)
CONTRACT N. C311321
A350 LF2
REFERENCE LIST
YEAR PROJECT NAME ITEMS SUPPLIEDEND USER DIMENSIONSDESTINATION EPC CLIENT MATERIAL
2016 UP TO 12"
UP TO 2"
UP TO 1.1/2"
VIAR WELD
FORGED FITTINGS
VIAR NIP-FLANGED
PETRONAS REFINERY
AND PETROCHEMICALS
INTEGRATED
DEVELOPMENT (RAPID)
PETROFAC
INTERNATIONAL LTD
MALAYSIARAPID PENGERANG
PROJECT
A105, A182 F316L
2016 UP TO 24"
UP 4"
UP TO 10"
WN FLANGE
3 - WAY FULL BORE
PIECE
3 LEG PIECE
QUICK COUPLING
CONNECTION
WYE PIECE
HOSE CONNECTION
SHELL CHEMICAL
APPALACHIA LLC
TECHNIP FRANCE
SAS
U.S.A.SHELL FRANKLIN PE3 -
SLURRY POLYETHYLENE
HDPE PROJECT
A350 LF2, A105,
A182 F304L
2016 UP TO 10"
20" x 14"
TARGET TEE
LATERAL TEE
CUU LONG JOINT
OPERATIVE COMPANY
PTSC -
PIETROVIETNAM
VIETNAMSU TU TRANG FULL FIELD
DEVELOPMENT, PHASE 1
A182 F51, A694 F65,
A105
2016 UP TO 36"
2"
UP TO 2"
UP TO 8"
UP TO 4"
FORGED TEE and RED.
TEE BW
VIAR SWEEP-INLET
FORGED FITTINGS
LATERAL TEE 45°
VIAR LAT
BP EXPLORATION
LIMITED
BECHTELEGYPTWEST NILE DELTA GAS
DEVELOPMENT
2016 2"x1/2"x1/2"
UP TO 4"
2"
10"
UP TO 10"
UP TO 52"
SPECIAL TRANSITION
PIECES
3 WAY FULL BORE
PIECES
INSERTED SPOONS
FOR SAMPLING
SPECIAL PIECES WITH
3 LEGS AT 60°
SPECTACLE BLIND
FLANGE
PADDLE BLIND &
SPACER
ZAPSIBNEFTEKHIM LLCTECHNIP FRANCE
SAS
RUSSIAZAPSIB-2 - PE PLANT A350 LF2, A182
F304, A516 GR.F70,
A240 GR.304/304L
2016 18"WYE PIECEPTTEPSAPURA KENCANAMYANMARZAWTIKA DEVELOPMENT
PROJECT PHASE 1C
A694 F65
2015 UP TO 4"
UP TO 1/2"
UP TO 1.1/2"
VIAR WELD
VAR NIP
VIAR NIP-FLANGED
PETROLEUM
DEVELOPMENT OMAN
NOOTER/ERIKSENSULTANATE OF
OMAN
AMAL STEAM PHASE 1 C -
HRSG PACKAGE
A105
2015 UP TO 14"
UP TO 2"
UP TO 1.1/4"
VIAR WELD
VIAR SOCK AND
THREAD
FORGED FITTINGS
NATIONAL
INVESTIMENT
COMMISSION OF IRAQ
(NIC)
ENKAIRAQBESMAYA PROJECT A105N, A182 F22,
A182 F11, A182 F91,
A182 F304L
2015 24"x22"x22"FORGED WYE PIECECOMISION FEDERAL DE
ELECTRICIDAD
ABEINSAMEXICOCENTRAL CICLO
COMBINADO NORTE III
A182 F91
2015 UP TO 14"
UP TO 2"
UP TO 2"
UP TO 12"
UP TO 2"
VIAR WELD
VIAR THREAD
VIAR NIP-FLANGED
VIAR SWEEP-INLETS
FORGED FITTINGS
BP EXPLORATION
LIMITED
PETROFAC E&C
OMAN LLC
SULTANATE OF
OMAN
CENTRAL PROCESSING
FACILITY (CPF), KHAZZAN
PROJECT
A350 LF2, A182
F316L
2015 UP TO 10"
UP TO 10"
ANCHOR FLANGE
FORGED BULKHEAD
ENI ANGONA S.P.A.SAIPEM SAANGOLAEAST HUB DEVELOPMENT
PROJECT, ANGOLA BLOCK
15/06
A694 F65
2015 UP TO 24"WN AND BLIND
FLANGE
ADMA-OPCONPCC/TECHNIPABU DHABI
(U.A.E.)
EPC OF ADDITIONAL GAS
SUPPLY TO ONSHORE &
FLEXIBILITY ASSURANCE
(A.G.F.A.)
A694 F65 + CLAD
INCONEL 625
2015 10"NORSOK COMPACT
FLANGE
PETROBRASSBM OFFSHOREBRAZILFPSO CAPIXABA A182 F51
2015 8"WYE PIECEPETROBRASMODECBRAZILFPSO CIDADE DE CAMPOS
DOS GOYTACAZES MV29
A182 F51
2015 UP TO 3"ASSEMBLY SAE
FLANGE - TRANSITION
SPOOL
PETROBRASSBM OFFSHOREBRAZILFPSO CIDADE DE MARICA
AND SAQUAREMA
A182 F316L-F51
REFERENCE LIST
YEAR PROJECT NAME ITEMS SUPPLIEDEND USER DIMENSIONSDESTINATION EPC CLIENT MATERIAL
2015 UP TO 3"
8" - 18"
1.13/16"
UP TO 3"
UP TO 20"
UP TO 3"
UP TO 2"
UP TO 2"
VIAR WELD
VIAR LOCK
WN FLANGES
VIAR SWEEP-INLETS
LATERAL TEE
VIAR SWEEP-FLANGES
FORGED FITTINGS
SPECTACLE BLIND
FLANGE
ENI GHANA
EXPLORATION AND
PRODUCTION LTD.
PTSC -
PIETROVIETNAM
GHANAGHANA OCTP
DEVELOPMENT PROJECT
A694 F65, A694 F60,
AISI 4140, A105,
A350 LF2, , A182
F51, A240 S31803,
A182 F31
2015 UP TO 4"VIAR WELDGASCO (ABU DHABI
GAS INDUSTRIES LTD)
AL ASAB GENERAL
CONTRACTING/ PUNJ
LLOYD ENG. PTE
.LTD.
U.A.E.INTERCONNECTION OF
ADWEC CRS TO DEL AT
TAWELLAH
A105
2015 UP TO 24"
UP TO 24"
SWIVEL RING FLANGE
WN AND BLIND
FLANGE
ENI MUARA BAKAU PSCP.T. TECHNIP
INDONESIA/ TECHNIP
GEOPRODUCTION
SDN BHD
INDONESIAJANGKRIK COMPLEX
PROJECT
A694 F65 + CLAD
INCONEL 625
2015 11"
UP TO 11"
12"
12"
SWIVEL RING FLANGE
WN FLANGE AND
BLIND
VIAR LOCK
ANCHORING
BULKHEAD
PETRONASTECHNIP MARINE (M)
SDN BHD
MALAYSIAKANOWIT PFLNG TIE-IN
PROJECT
A694 F65 + CLAD
INCONEL 825
2015 20/60 TONURA-HOOKTOTAL EXPLORATION
PRODUCTION ANGOLA
TECHNIP FRANCEANGOLAKAOMBO SURF PROJECT,
BLOCK 32
A694 F52
2015 UP TO 1"
UP TO 2"
VIAR SOCK
FORGED FITTINGS
STATE COMPANY FOR
OIL PROJECTS (SCOP)
HDGSK JVIRAQKARBALA REFINERY
PROJECT
A182 F51
2015 UP TO 2"
UP TO 1"
UP TO 4"
VIAR NIP-FLANGED
VIAR SWEEP
VIAR NIP
KNPCJGSK (JV BY JGC, GS
ENG., SK ENG. &
CONSTRUCTION).
KUWAITKNPC CLEAN FUEL
PROJECT
B462 UNS N08020
B564 UNS N08825
2015 18" AND 20"FORGED PADEYEPETROBRASSAIPEMBRAZILLULA NORTE, LULA
EXTREMO SUL AND LULA
SUL PROJECT
A694 F52
2015 UP TO 3"
UP TO 1"
UP TO 1.1/2"
VIAR WELD
VIAR SOCK
FORGED FITTINGS
TOTALTECHNIP FAR EAST
(BRUNEI BRANCH)
SDN BHD
BORNEOMAHARAJA LELA SOUTH
PRJ
A182 F316L, A182
F51
2015 UP TO 1.1/2"VIAR NIPKUWAIT NATIONAL
PETROLEM COMPANY
(KNPC)
KUWAIT NATIONAL
PETROLEM
COMPANY (KNPC)
KUWAITMINA ABDULLAH (MAB-2)
PACKAGE FOR THE CLEAN
FUEL PROJECT (CFP)
A105
2015 UP TO 18"HANGER FLANGEADMA-OPCONPCCU.A.E.NASR FULL FIELD
DEVELOPMENT PROJECT -
EPC PACKAGE 1
A694 F65
2015 UP TO 10"
UP TO 12"
VIAR WELD
SPECIAL O'LET AT DWG
PETRONAS SDN BHDSIEMENS AGMALAYSIAPENGERANG
COGENERATION PLANT
A105, A182 F91,
A182 F22, A182 F11
2015 16" - 10"WYE PIECECHEVRONCUELTHAILANDPHASE 50 INTEGRATED
WHP WELLHEAD
PLATFORM
A694 F52 WITH
INCONEL 625
INTERNALLY
CLADDING
2015 UP TO 10"VIAR WELD
PIPE
BW FITTING
FORGED FITTING
CUSHION TEE
WN & BLIND FLANGE
VIAR-LOCK
CHEVRONCUELTHAILANDPHASE 50 AND PHASE 51
INTEGRATED WHP
WELLHEAD PLATFORM OIL
& GAS AND PIPELINES
A182 F51, A790
UNS S31803, A815
UNS S31803
2015 UP TO 38"
UP TO 38"
SWIVEL RING FLANGE
WN AND BLIND
FLANGE
RASGAS COMPANY
LIMITED
MC DERMOTT
MIDDLE EAST
QATARRASGAS OFFSHORE
EXPANSION PROJECT -
PHASE 2
A694 F65 WITH
INCONEL 625
CLADDING
2015 3/4"
UP TO 3"
VIAR SOCK
FORGED FITTINGS
SHINTECH LOUISIANA,
LLC
TOYO ENGINEERING
CORP.
U.S.A.SHINTECH ETHANE
CRACKER PLANT PROJECT
SB/B564 UNS
NO6600, A182 F51
2015 UP TO 2"
UP TO 2"
UP TO 1"
VIAR LAT
VIAR SOCK
FORGED FITTING
PANDA POWERS
FUNDS
BECHTEL OIL GAS
AND CHEMICALS,
INC.
U.S.A.STONEWALL ENERGY
PROJECT
A105, A182 F91,
A182 F22,
A182F304L
REFERENCE LIST
YEAR PROJECT NAME ITEMS SUPPLIEDEND USER DIMENSIONSDESTINATION EPC CLIENT MATERIAL
2015 12"
UP TO 20"
UP TO 10"
UP TO 8"
FORGED BARRED TEE
LATERAL TEE
VIAR LOCK
TARGET TEE
CUU LONG JOINT
OPERATIVE COMPANY
PTSC -
PIETROVIETNAM
VIETNAMSU TU TRANG FULL FIELD
DEVELOPMENT, PHASE 1
A694 F65, AISI 4140
HDG, A182 F51,
A105, A182 F316L
2015 UP TO 24"
UP TO 1.1/2"
UP TO 24"
UP TO 1.1/2"
VIAR WELD
VIAR SOCK
VIAR LAT
FORGED FITTING
PETROPERU'TECNICAS REUNIDASPERU'TALARA REFINERY
PROJECT
A105, A350 LF2,
A182 F321, A182
F304L, F9,F5,
F11,F22
2015 MAX. LENGHT 3,6
METERS
FORGED HEADER AT
DWG
ADMA-OPCONPCC/ TECHNIP ABU
DHABI
ABU DHABIUMM LULU PHASE II FULL
FIELD DEVELOPMENT
PROJECT
A350 LF2
2014 2"VIAR WELDADMA-OPCONPCC/TECHNIP ABU
DHABI
ABU DHABIADMA-OPCO UMM LULU 1 A694 F65
2014 UP TO 24"VIAR WELDGOVERNMENT OF KSAGOVERNMENT OF
KSA
SAUDI ARABIAAL WELLS PIPELINE PRJ A105, F42
2014 UP TO 1"
UP TO 20"
VIAR SOCK
VIAR WELD
ANGOLA LNG LIMITEDBECHTEL OIL GAS
AND CHEMICALS,
INC.
ANGOLAANGOLA LNG PROJECT A105, A350 LF2,
A182 F304L, A182
F316L
2014 UP TO 8"
UP TO 1.1/2"
VIAR WELD
VIAR NIP-FLANGED
BRUNEI LNG SDN BHDTOYO KANETSU K.K.BRUNEIBLNG TANK T-4106 EPC
PROJECT
A182 F304
2014 UP TO 12"
UO TP 1.1/2"
UP TO 2"
VIAR WELD
VIAR SOCK
FORGED FITTINGS
ABU DHABI POLYMERS
COMPANY LIMITED
DESCON
ENGINEERING
ABU DHABIBOROUGE FLARE GAS
RECOVERY PRJ
A105, A350 LF2,
A182 F316L
2014 UP TO 16"
UP TO 12"
UP TO 4"
FORGED END PLATE
FORGED NOZZLE
BLIND FLANGE
VATTENFAL EUROPE
WARME AG
NOOTER/ERIKSENGERMANYCC-CHP LICHTERFELDE 16Mo3,
X10CrMoVnb9-1,
11CrNo9-10,
P305GH, 13CrMo4,
P265GH
2014 6"
UP TO 26"
UP TO 6"
UP TO 2"
UP TO 10"
UP TO 12"
UP TO 2"
FORGED PIPE BW
FORGING PIECE AT
DWG
VIAR WELD
VIAR SOCK
LWN FLANGE AT DWG
BW FITTING
VIAR LAT
ENERJI SASIEMENS AGTURKEYCCPP BANDIRMA II HRSG
PRJ
A105, A369 FP92,
A182 F11, A182 F22,
A182 F316, A182
F92, A234 WP11
2014 UP TO 6"
UP TO 2"
UP TO 2"
UP TO 24"
UP TO 20"
VIAR WELD
VIAR SOCK
FORGED FITTING
FORGING PIECE AT
DWG
LWN FLANGE AT DWG
FIRST NATGAS POWER
CORPORATION
SIEMENS AGPHILIPPINESCCPP SAN GABRIEL
POWER PLANT HRSG PRJ
A105, A182 F22,
A182 F11, A182 F91
2014 UP TO 2"
UP TO 2"
FORGED FITTINGS
VIAR SOCK/THREAD
ETHYDCOENPPI-EGYPTEGYPTETHYLENE UTILITIES AND
OFFSITES PRJ
A105, A182 F316L
2014 UP TO 4"
UP TO 2"
UP TO 2"
VIAR WELD
VIAR SOCK
FORGED FITTINGS
NORTH WEST
REDWATER
LARSEN & TOUBRO
LIMITED
CANADAFLUOR-NWR PARTNERSHIP A182 F316L, A812
F317L, A182 F304L,
A182 F321H, A182
F347H
2014 UP TO 2"
UP TO 8"
UP TO 2"
SINO 2015
FORGED FITTINGS
BW FITTING
VIAR NIP-FLANGED
SHELLDAEWOO NIGERIA
LTD
NIGERIAGBARAN-UBIE PHASE II
INFILL PROJECT
A105N, A182 F316L,
A182 F51
2014 UP TO 1.1/2"
UP TO 2"
VIAR SOCK
FORGED FITTINGS
OIL AND NATURAL GAS
CORPORATION LTD
TECHNIP INDIA LTDINDIAHRD PROCESS PLATFORM F316L
2014 UP TO 30"BARRED TEETOTAL E&P BOLIVIESPIECAPAG BOLIVIABOLIVIAINCAHUASI PROJECT A694 F65
2014 UP TO 6"
UP TO 6"
UP TO 1.1/2"
UP TO 2"
VIAR WELD
VIAR LAT
VIAR SOCK
FORGED FITTINGS
RELIANCE INDUSTRIES
LTD
RELIANCE
INDUSTRIES LTD
INDIAJ3 PROGRAM JAMNAGAR A182 F51, A182
F304L, SB/B564
UNS N06600, UNS
N04400, SB/B462
UNS N08020, A182
F
2014 UP TO 1./2"
UP TO 2"
FORGED FITTING
VIAR WELD AND VIAR
SOCK
SAUDI ARAMCOHITACHI
ENGINEERING &
CONSTRUCTION CO.
LTD
SAUDI ARABIAJAZAN REFINERY PROJECT A182F304L, F316L,
A182 F60, 182 F53
REFERENCE LIST
YEAR PROJECT NAME ITEMS SUPPLIEDEND USER DIMENSIONSDESTINATION EPC CLIENT MATERIAL
2014 UP TO 14"
UP TO 32"
14"
UP TO 14"
UP TO 3"
6"
D.50
UP TO 10"
SPECIAL FORGED
BARRED TEE
FORGED BULKHEAD
FORGED WHEEL
FORGED ANCHORING
PART
FORGED VIAR
SWEEPOLET
FORGED ELBOW
ROUND BAR
SENSOR SPOOL PIECE
TOTAL EXPLORATION
PRODUCTION ANGOLA
TECHNIP & HMCANGOLAKAOMBO SURF PROJECT,
BLOCK 32
A694 F65, A694 F60
2014 UP TO 18"
UP TO 4"
18"x14"
UP TO 12"x10"
UP TO 2"
UP TO 2"
WN FLANGE API 15000
BLIND FLANGE
FORGED BARRED TEE
FORGED LATERAL TEE
FORGED FITTINGS
VIAR SOCK
TOTALTOTAL E&P BORNEOBORNEOMAHARAJA LELA SOUTH
PRJ
F51,F53,A105N +
CLAD SS316L, A694
F65 + CLAD
SS316L, A182
F316L, A694 F60 +
CLAD
2014 UP TO 10"
UP TO 1"
VIAR WELD
VIAR SOCK
DUBAI SUPPLY
AUTHORITY
DUBAI SUPPLY
AUTHORITY
DUBAIMARGHAM CAPACITY
INCREASE PRJ
A182 F51, A182
F316L, A105
2014 6"x6", 14"x 12"BARRED TEEBG INDIALARSEN & TOUBRO
LIMITED
INDIAMB PLATFORM & PIPELINE
PROJECT
A694 F60
2014 3", 6", 8", 12"
3/4"
UP TO 2"
BARRED TEE
VIAR SOCK
FORGED FITTINGS
TOTAL E&P CONGOH.H.I.CONGOMOHO NORD TLP PROJECT A694 F65, A182 F51
2014 UP TO 4"
UP TO 1.1/2"
UP TO 12"
UP TO 2"
VIAR WELD
VIAR SOCK
LATERAL TEE
FORGED FITTINGS
NGHI SON REFINERY
AND PETROCHEMICAL
LIMITED LIABILITY
COMPANY (NSRP)
JGCSVIETNAMNGHI SON REFINERY AND
PETROCHEMICAL
COMPLEX (NSRP)
A105, A350 LF2,
A182 F304L, F316L,
F321, A182 F9, F11,
ASTM B564 UNS
N08825
2014 UP TO 6"
UP TO 1.1/2"
UP TO 4"
SINO 2015
VIAR WELD
VIAR SOCK
VIAR THREAD
VERSALIS/ENISAIPEM S.P.A.ITALYNUOVA LINEA EDPM 50 KTY A105N, A350LF2,
A182 F316L
2014 UP TO 3"
UP TO 1.1/2"
12"
UP TO 12"
UP TO 2"
VIAR WELD
VIAR SOCK
SPECTACLE BLIND
FLANGE
LWN FLANGE
FORGED FITTINGS
TOTAL E&P NIGERIA
LTD
GROUPE PONTICELLI
FRERES
NIGERIAOFON PHASE 2 PROJECT A182 F51, A182
F316L, A105, A350
LF2, A695 F52
2014 UP TO 1.1/2"
UP TO 2"
UP TO 10"
UP TO 10"
VIAR SOCK
FORGED FITTINGS
BW FITTING
BLIND, WN,SW FLANGE
ONGCGOL OFFSHORE LTDINDIAONGC BPA-BPB PLATFORM A182 F51, A815
UNS S31803, F316L
2014 12"WYE PIECECHEVRONCUELTHAILANDPHASE 47 INTEGRATED
WHP WELLHEAD
PLATFORM
A694 F52 WITH
INCONEL 625
INTERNALLY
CLADDING
2014 UP TO 10"VIAR WELD
PIPE
BW FITTING
FORGED FITTING
WN & BLIND FLANGE
VIAR-LOCK
CHEVRONCUELTHAILANDPHASE 48 INTEGRATED
WHP WELLHEAD
PLATFORM OIL & GAS AND
PIPELINES EPCI PROJECT
A790 UNS S31803,
A815 UNS S31803,
A182 F51
2014 UP TO 10"VIAR WELD
PIPE
BW FITTING
FORGED FITTING
CUSHION TEE
WN & BLIND FLANGE
VIAR-LOCK
CHEVRONCUELTHAILANDPHASE 49 INTEGRATED
WHP WELLHEAD
PLATFORM OIL & GAS AND
PIPELINES EPCI PROJECT
A182 F51, A790
UNS S31803, A815
UNS S31803
2014 UP TO 1"
UP TO 3"
VIAR WELD
FORGED FITTINGS
AL JUBAIL
PETROCHEMICAL
COMPANY
SABICSAUDI ARABIASAUDI ELASTOMERS
U&O/CB/MTBE
DECOMPOSITION
FACILITIES
A182 F44, SB/B729
UNS N08020
2014 16"WYE PIECE 45°DYNO NOBELKBRU.S.A.THE DYNO NOBEL
LOUSIANA AMMONIA (F441)
PROJECT
A105
REFERENCE LIST
YEAR PROJECT NAME ITEMS SUPPLIEDEND USER DIMENSIONSDESTINATION EPC CLIENT MATERIAL
2014 2.1/16" 1000PSIWN FLANGESTULLOW GHANA LTDSUBSEA 7 WEST
AFRICA SAS
GHANATULLOW TEN
DEVELOPMENT PROJECT
A182 F55
2014 UP TO 24"
UP TO 20"
UP TO 20"
UP TO 1.1/2"
UP TO 6"
VIAR SWEEP-INLETS
45°
VIAR SWEEP-INLETS
VIAR WELD
VIAR SOCK/THREAD
VIAR LAT
CHEVRON AUSTRALIA
PTY LTD
BECHTELAUSTRALIAWHEATSTONE PROJECT
LNG PLANT
A105, A182 F304L,
A182 F316L, A350
LF2, LF3
2014 UP TO 24"SINO 2015
VIAR WELD
JSC YAMAL LNGTECHNIP FRANCE/
YAMGAZ SNC
RUSSIAYAMAL LNG PROJECT A182 F304L, A182
F316L, A350 LF2
2014 8", 14", 16"
UP TO 16"
BARRED TEE
VIAR WELD
PETROLEUM
DEVELOPMENT OMAN
LARSEN & TOUBRO
LIMITED
SULTANATE OF
OMAN
YIBAL 3rd STAGE
DEPLETION COMPRESSION
PROJECT
A860 WPHY52,
A182 F51
2014 UP TO 10"
UP TO 2"
VIAR WELD
VIAR NIP-FLANGED
ADMA-OPCONPCCU.A.E.ZAKUM OIL LINE
REPLACEMENT - PHASE 1
A694 F60, A694 F65
2014 UP TO 16"
UP TO 20"
UP TO 18"
UP TO 18"
UP TO 20"
UP TO 18"
4"
4"
UP TO 4"
FORGED BARREL PIPE
FORGED BARRED TEE
SWIVEL RING FLANGE
HANGER FLANGE
WN FLANGE
BLIND FLANGE
VIAR LOCK
CLAMPED TARGET
TEE
VIAR WELD
PTTEPCOOEC (CHINA
OFFSHORE OIL
ENGINEERING CO.)
BIRMANIAZAWTIKA DEVELOPMENT
PROJECT PHASE 1B
A694 F65, A182 F51,
A182 F53, A182
F316L , A105N
2013 UP TO 12"
UP TO 12"
UP TO 12"
UP TO 12"
BARRED TEES
J-LAY COLLARS
ANCHOR FLANGE
REDUCER
ESSO EXPLORATION
AND PRODUCTION
NIGERIA
SUBSEA 7 WEST
AFRICA SAS
NIGERIAERHA NORTH PHASE 2
NIGERIA DEEPWATER
PROJECT
A694 F65
2013 24"WYE PIECEPETRONASPETRONAS CARIGALI
SDN BHD
MALAYSIAEVA-NMB GAS DELIVERY
SYSTEM (ENGDS)
A694 F65
2013 UP TO 12"
8"
UP TO 8"
12", 14", 16"
UP TO 2"
7.1/16", 11"
8", 12"
UP TO 1"
BARRED TEE
WYE PIECE
VIAR WELD
VIAR LOCK
VIAR NIP-FLANGED
SWIVEL RING FLANGES
WN FLANGES
VIAR THREAD
PETROBRASSBM OFFSHOREBRAZILFPSO CIDADE DE MARICA
AND SAQUAREMA
A105, A350 LF2,
A694 F52, A694 F65,
A182 F51, AISI 4140,
2013 UP TO 11"
UP TO 11"
INTEGRAL SPOOL
FLANGES
SWIVEL RING
FLANGES
PETROBRASSBM OFFSHOREBRAZILFPSO CIDADE DE MARICA
AND SAQUAREMA
A182 F51, AISI 4130
WITH CLADDING
INCONEL 625,
INCONEL 625
2013 2" AND 3"VIAR LOCKPEARL OIL LIMITEDWORLEYPARSONS/
MUBADALA
PETROLEUM
THAILAND LIMITED
THAILANDG11/48 NONG YAO FIELD
DEVELOPMENT PROJECT
A182 F51
2013 UP TO 8"
UP TO 2"
UP TO 1.1/2"
VIAR WELD
VIAR NIP-FLANGED
FORGED FITTING
INPEX BROWSE LTD.SAMSUNGAUSTRALIAICHTHYS INPEX GAS FIELD
DEVELOPMENT PROJECT
B564 UNS N10276,
A182 F51
2013 UP TO 42"
UP TO 18"
2"
2"
2"
BARRED TEE
BW FITTING
VIAR SWEEP-INLETS
PIPE
WN FLANGE
INPEX OPERATIONS
AUSTRALIA PTY LTD
BERLIAN
MCDERMOTT SDN.
BHD.
AUSTRALIAICHTHYS INPEX GAS FIELD
DEVELOPMENT PROJECT
A694 F65, A182 F51,
A182 F53, A790
UNS S31803, A790
UNS S32760
2013 UP TO 3"
UP TO 2"
UP TO 24"
VIAR WELD
VIAR SOCK
FORGING PIECE AT
DWG
SAUDI ARAMCONEM / SIEMENSSAUDI ARABIAJAZAN POWER ISLAND
PROJECT
A105, A182 F11,
A182 F22, A182 F91,
A182 F316
REFERENCE LIST
YEAR PROJECT NAME ITEMS SUPPLIEDEND USER DIMENSIONSDESTINATION EPC CLIENT MATERIAL
2013 UP TO 12"
UP TO 16"
UP TO 16""
UP TO 22"
6" AND 10"
REDUCER AT DWG
INTERMEDIATE AND
END BULKHEAD AT
DWG
SUPPORT RING AT
DWG
FORGED ANCHOR AT
DWG
BW FITTING
ESSO EXPLORATION
ANGOLA
SAIPEM SAANGOLAKIZOMBA SATELLITES EPC3
TIEBACKS PROJECT
PHASE 2
A694 F65
2013 UP TO 8"
UP TO 2"
UP TO 4"
4"
VIAR WELD
VIAR THREAD/SOCK
FORGED FITTINGS
VIAR ELB
LUKOIL NEFTOCHIM
BOURGAS
TECHNIP S.P.A.BULGARIALUKOIL NEFTOCHIM
BOURGAS - HEAVY
RESIDUE PROCESS
COMPLEX 1ST PHASE
A105, A350 LF2,
A812 F304L,F316L,
F321, F9,F51,
F347,F11, F317L
2013 18"FORGED BUCKLE
ARRESTOR
PETROBRAS/SAIPEMSAIPEM DO BRASILBRAZILLULA-NE CERNAMBI
GASLINE PROJECT
A694 F65
2013 UP TO 6"
UP TO 1.1/2"
UP TO 1"
SINO 2014
VIAR WELD
VIAR NIP-FLANGED
VIAR NIP
SHELLTMJV MALIKAIMALAYSIAMALIKAI EPC TLP PROJECT A182 F51, A182
F316L, A105
2013 UP TO 1.1/2"
UP TO 1.1/2"
UP TO 4"
FORGED FITTING
VIAR NIP
VIAR WELD
TOTALTECNICAS REUNIDASBELGIUMOPTARA PROJECT A105, A350 LF2,
A182 F304L, A182
F11,A182 F5, A182
F321, B564 UNS
N08825
2013 UP TO 24"
UP TO 2"
UP TO 2"
VIAR WELD
VIAR SOCK/THREAD
FORGED FITTINGS
ARABIAN
PETROCHEMICAL
COMPANY
TECNICAS REUNIDAS
SA
SAUDI ARABIAPETROKEMYA ABS
PROJECT
A105, A182 F304L,
A182 F316L
2013 UP TO 8"VIAR WELD
FORGED FITTINGS
PETRONASJGC CORPORATIONMALAYSIAPETRONAS LNG TRAIN 9 A105N, A350 LF2,
A182 F304L
2013 UP TO 16"SWIVEL RING FLANGE
WN AND BLIND
FLANGE
CHEVRONCUELTHAILANDPHASE 44/45/46/47/48/49/50
INTEGRATED WHP
WELLHEAD PLATFORM
AND PIPELINES PROJEC
A694 F52, A694 F52
WITH CLADDING
INCONEL 625
2013 UP TO 10"VIAR WELD
PIPE
BW FITTING
FORGED FITTING
WN & BLIND FLANGE
VIAR-LOCK
CHEVRONCUELTHAILANDPHASE 46 AND 47
INTEGRATED WHP
WELLHEAD PLATFORM OIL
& GAS AND PIPELINES EPCI
P
A790 UNS S31803,
A815 UNS S31803,
A182 F51
2013 UP TO 16"
UP TO 20"
UP TO 16"
SINO 2015
BARRED TEE
ECCENTRIC &
CONCENTRIC
REDUCER
SPECTACLE BLIND
FLANGE
CHEVRONCUELTHAILANDPHASE 46/47/48/49/50
INTEGRATED WHP
WELLHEAD PLATFORM
AND PIPELINES PROJECT
A860 WPHY 52,
A516 GR.70
2013 14"
14", 18"
14", 18"
14"
PIGGABLE WYE PIECE
WN FLANGE
SWIVEL RING FLANGE
BLIND FLANGE
PTTEPTHAI NIPPON STEEL
& SUMIKIN
ENGINEERING &
CONSTRUCTION
CORP. LTD.
THAILANDPTTEP - LONG TERM
CONTRACT, BONGKOT
PHASE , B3M
A694 F60
2013 UP TO 1.1/2"
UP TO 12"
SINO 2014
VIAR SOCK
VIAR WELD
SAUDI
ARAMCO/SUMITOMO
CHEMICAL
SAIPEM S.P.A.SAUDI ARABIARABIGH (RP2) A015, A182 F304L,
A182 F11, A350 LF2,
A182 F11, F22, F321
2013 UP TO 44"
UP TO 10"
UP TO 10"
UP TO 1.1/2"
VIAR WELD
VIAR ELB
VIAR SWEEP-INLETS
VIAR SOCK/THREAD
CHENIERE ENERGY
INC.
BECHTEL OG&C, INC.U.S.A.SABINE PASS
LIQUEFACTION PROJECT
A105N, A350 LF2,
A182 F304L
2013 UP TO 1.1./2"
UP TO 2"
UP TO 1"
VIAR-NIP FLANGED
VIAR WELD
FORGED FITTING
PETROLEUM
DEVELOPMENT OMAN
(PDO)
LARSEN & TOUBRO
LIMITED
SULTANATE OF
OMAN
SAIH RAWL DEPLETION
COMPRESSION - PHASE 2
A182 F51, A105
HDG
2013 18", 20"BUCKLE ARRESTORSPETROBRASSAIPEMBRAZILSAPINHOA NORTE &
IRACEMA SUL PROJECT
A694 F65
REFERENCE LIST
YEAR PROJECT NAME ITEMS SUPPLIEDEND USER DIMENSIONSDESTINATION EPC CLIENT MATERIAL
2013 2"
12"
2"
UP TO 12"
VIAR SWEEP-INLETS
SWIVEL RING FLANGES
BW FITTING
WN AND BLIND
FLANGE
TOTALTOTAL E&P
INDONESIE
INDONESIASOUTH MAHAKAM FIELD
DEVELOPMENT PROJECT,
PHASE 3
A694 F65
2013 UP TO 10"
UP TO 1"
UP TO 2"
VIAR WELD
VIAR NIP
FORGED FITTING
SHELL PETROLEUM
DEVELOPMENT
COMPANY OF NIGERIA
SAIPEM
CONTRACTING
NIGERIA LTD.,
SNAMPROGETTI
ENG. B.V., DESICON
ENGINEERIG LTD.
NIGERIASOUTHERN SWAMP
ASSOCIATED GAS
SOLUTION (SSAGS)
PROJECT
A105, A350 LF2,
A182 F316, A182
F51
2013 UP TO 10"
UP TO 1.1/2"
VIAR WELD
VIAR SOCK
LUKOILTECNICAS REUNIDAS
SA
RUSSIAVOLGOGRAD PROJECT ,
DEEP CONVERSION
COMPLEX
A350 LF2, A182
F316L, A182 F304L,
A182 F11, A182
F347
2013 UP TO 44"
UP TO 44"
SUBSEA HANG-OFF
FLANGES
TEST RINGS
CHEVRON AUSTRALIA
PTY LTD
CHEVRONAUSTRALIAWHEATSTONE UPSTREAM
PROJECT SUBSEA
FLOWLINES AND
PIPELINES
A694 F65 WITH
CLADDING UNS 625
2013 44"
44"
44"
SUBSEA NORSOK
COMPACT SWIVEL
FLANGES
SUBSEA NORSOK
COMPACT WN
FLANGES
SUBSEA NORSOK
COMPACT BLIND
FLANGES
CHEVRON AUSTRALIA
PTY LTD
CHEVRONAUSTRALIAWHEATSTONE UPSTREAM
PROJECT SUBSEA
FLOWLINES AND
PIPELINES
A694 F65 WITH
CLADDING UNS 625
2013 28"x28"
28"
28"
28"
2"
BARRED TEE
WN AND BLIND
FLANGE
FORGED PIPE
BW FITTING
VIAR WELD
ANDAMAN
TRANSPORTATION
LIMITED (ATL)
THAI NIPPON STEEL
& SUMIKIN
ENGINEERING &
CONSTRUCTION
CORP. LTD.
THAILANDZAWTIKA DEVELOPMENT
PROJECT PHASE 2A
A694 F60, A105N
2012 UP TO 4"VIAR WELDSAUDI ARAMCOENI/SAIPEMSAUDI ARABIAARABIYAH & HASBAH
OFFSHORE AND ONSHORE
FACILITIES
B564 UNS N06625
2012 UP TO 60"
UP TO 1.1/2"
UP TO 24"
UP TO 12"
UP TO 2"
VIAR WELD
VIAR SOCK/THREAD
VIAR SWEEP-INLETS
VIAR LAT
LATERAL TEE
CONOCOPHILLIPS-SINO
PEC
BECHTEL OIL, GAS
AND CHEMICALS, INC
AUSTRALIAAUSTRALIA PACIFIC LNG
PROJECT
A105, A350 LF2,
A182 F304/304L,
F347H
2012 3" AND 4"FORGED BARRED TEERASGAS COMPANY
LIMITED
HHI (HYUNDAI HEAVY
INDUSTRIES CO.,
LTD.)
QATARBARZAN OFFSHORE
PROJECT
A694 F65
2012 UP TO 4"VIAR WELDPETRONAS CARIGALI
SDN BHD
PETROFACMALAYSIABEKOK-C RESTORATION
(OM12001)
A105, A182 F316L
2012 UP TO 12"
UP TO 12"
UP TO 12"
BARRED TEE
WN/BLIND FLANGES
BW FITTING
SONATRACH/PTTEP/
PVEP
JGC CORPORATIONALGERIABIR SEBA FIELD
DEVELOPMENT PROJECT
A694 F60
2012 UP TO 4"
UP TO 1.1/2"
UP TO 2"
VIAR WELD
VIAR SOCK/ VIAR
THREAD
FORGED FITTING
ABU DHABY POLYMERS
COMPANY LTD.
HDEC (HYUNDAI
ENGINEERING &
CONSTRUCTION
CO.,LTD.)
U.A.E.BOROUGE 3 XLPE
PROJECT
A105N, A182 F316L
2012 UP TO 8"
UP TO 2"
UP TO 2"
UP TO 1.1/2"
VIAR WELD
VIAR LAT
VIAR SWEEP-INLETS
FORGED FITTING
BP EXPLORATION
OPERATING COMPANY
LTD
HHIU.K.BP CLAIR RIDGE A182 F51, A182 F53
2012 18"
18"
VIAR TUBE HUB AT
DWG
VIAR LOCK
CONOCO PHILLIPSELDFISKNORWAYELDFISK ALLIANCE
PROJECT
A182 F44, A350 LF2,
AISI 4140 HDG
2012 2"VIAR NIP-FLANGEDABU DHABI COMPANY
FOR ONSHORE OIL
OPERATIONS (ADCO)
NPCCABU DHABIEPC FOR BAB THAMAMA G
& HABSHAN 2 1.8 MMBOPD
PHASE 1 DEVELOPMENT
PROJECT
B564 UNS N08825
2012 UP TO 42"WN FLANGEESSO AUSTRALIA PTY
LTD
WOOD GROUP PSNAUSTRALIAESSO RETROFIT PROJECT A182 F310
REFERENCE LIST
YEAR PROJECT NAME ITEMS SUPPLIEDEND USER DIMENSIONSDESTINATION EPC CLIENT MATERIAL
2012 UP TO 12"
UP TO 1.1/2"
UP TO 2"
VIAR WELD
VIAR SOCK/THREAD
FORGED FITTING
BRASKEM IDESA SAPITECHNIP S.P.A.MEXICOETILENO XXI PROJECT 2408 A105, A350 LF2,
A182 F11, A182 F22,
A182 F304L, A182
F316L
2012 UP TO 42"
UP TO 1.1/2"
UP TO 20"
UP TO 14"
UP TO 2"
VIAR WELD
VIAR SOCK/THREAD
VIAR SWEEP-INLETS
VIAR ELB
FORGED FITTING
SANTOS LTD.BECHTEL OIL, GAS
AND CHEMICALS,
INC.
AUSTRALIAGLADSTONE LNG PLANT
PROJECT
A105, A350 LF2,
A182 F304L/F316L,
A182 F347H
2012 UP TO 2"
UP TO 2"
UP TO 3"
VIAR WELD
VIAR NIP-FLANGED
VIAR SWEEP-INLETS
CHEVRON AUSTRALIAKELLOG JOINT
VENTURE GORGON
AUSTRALIAGORGON PROJECT
BARROW ISLAND LNG
PLANT
A105, A182 F53,
A182 F316L, A182
F51
2012 VIAR WELD
VIAR SOCK
FORGED FITTING
JORF LASFAR ENERGY
COMPANY
DAEWOO E&CMAROCCOJORF LASFAR A105, A182 F316L,
A182 F11, A182 F22
2012 UP TO 6"
UP TO 1.1/2"
UPTO 2"
VIAR WELD
VIAR NIP-FLANGED
FORGED FITTING
PDO (PETROLEUM
DEVELOPMENT OMAN)
LARSEN & TOUBRO
LTD. OMAN
OMANLEKHWAIR GAS FIELD
DEVELOPMENT POJECT
A105, A182 F51,
A182 F316L, A350
LF2
2012 UP TO 14"LATERAL TEEPTTEPLARSEN & TOUBRO
LTD.
THAILANDM9 ZAWTIKA PROJECT A234WPB, A420
WPL6
2012 UP TO 24"
UP TO 2"
UP TO 4"
VIAR WELD
VIAR SOCK/THREAD
FORGED FITTING
PARNAIBAINTEC ENGINEERINGBRAZILMPX UTE PARNAIBA
PROJECT
A105, A182
F304L/F316L, A182
F11, A182 F91
2012 12"HOT TAP FLANGEPREMIER OIL NATUNA
SEA BV (PONSBV)
JP KENNYINDONESIANAGA AND PELIKAN
PIPELINES FEED
A694 F65
2012 UP TO 8"
UP TO 2"
2"
VIAR WELD
VIAR SOCK/THREAD
FORGED FITTING
INEOS OLEFINS &
POLYMERS U.S.A.
KBRU.S.A.OL2 SCORE FURNACE
ADDITION EP
A105, A182 F11,
A182 F22, A182
F304
2012 UP TO 12"ANCHOR FLANGEPETROCHAD
(MANGARA) LTD
JP KENNYCHADPCM MANGARA EXA A694 F60
2012 UP TO 10"VIAR WELD
PIPE
BW FITTING
FORGED FITTING
WN & BLIND FLANGE
VIAR-LOCK
CHEVRONCUELTHAILANDPHASE 44 & PHASE 45
INTEGRATED WHP
WELLHEAD PLATFORM OIL
& GAS AND PIPELINES EPC
A790 UNS S31803,
A815 UNS S31803,
A182 F51
2012 12" X 12"BARRED TEEIRPCIRPCTHAILANDPTTAR-IRPC
MULTIPRODUCT PIPELINE
PROJECT
A694 F52
2012 16", 18"
16", 18"
16", 18"
SUB SEA PIGGABLE
WYE
WN FLANGE
BLIND FLANGE
PTTEPTHAI NIPPON STEELTHAILANDPTTEP - ARTHIT AND
BONGKOT FIELD
DEVELOPMENT, BUNDLED
PHASES EPCI FOR
WELLHEAD P
A694 F60
2012 UP TO 20"
UP TO 1.1/2"
UP TO 3"
SINO 2013
VIAR WELD
VIAR NIP
VIAR NIP-FLANGED
QSTEC (QATAR SOLAR
TECHNOLOGIES)
PUNJ LLOYD
ENGINEERING
QATARQSTEC POLYSILICON
PROJECT - PHASE I
SA A105, A182
F316Ti
2012 UP TO 8"
UP TO 8"
UP TO 3"
UP TO 1"
SINO 2013
FLANGE ADAPTERS
VIAR WELD
VIAR NIP-FLANGED
VIAR NIP
ADCONPCCU.A.E.QUSAHWIRA FULL FIELD
DEVELOPMENT PROJECT
A694 F60, A105N,
A182 F316L,
A350LF2, A182 F53,
UNS N08825, UNS
N06625
2012 UP TO 24"VIAR WELDSALINE WATER
CONVERSION
CORPORATION
MTMM (MOHAMED
TURKI MOTT
MACDONALD
ENGINEERING
CONSULTANCY
SAUDI ARABIARAS ALZAUR - HAFAR
ALBATIN WATER
TRANSMISSION SYSTEM
A694 F65
2012 UP TO 6"
UP TO 3/4"
UP TO 3/4"
VIAR WELD
VIAR SOCK
FORGED FITTING
RUMAILA FIELD
OPERATING
ORGANISATION (ROO)/
SOUTH OIL COMPANY
(SOC)
BP PETROLEUMIRAQRUMAILA OIL FIELD
REDEVELOPMENT (BASRA)
A105N
2012 10"
12"
12"
ANCHOR FLANGE
BUCKLE ARRESTORS
J-COLLARS
MURPHY SABAH OIL
CO., LTD.
BERLIAN
MCDERMOTT SDN.
BHD.
MALAYSIASIAKAP NORTH PETAI
DEVELOPMENT PROJECT
A694 F65
REFERENCE LIST
YEAR PROJECT NAME ITEMS SUPPLIEDEND USER DIMENSIONSDESTINATION EPC CLIENT MATERIAL
2012 UP TO 20"
UP TO 20"
WN FLANGE
HANGER FLANGE
TOTAL E & P INDONESIESWIBERINDONESIASISI NUBI 2B & PECIKO 7B
DEVELOPMENT PROJECT
A694 F65
2012 UP TO 1"
UP TO 1.1/2"
UP TO 2"
VIAR WELD
VIAR SOCK
FORGED FITTING
AIR PRODUCTS PLCFOSTER WHEELER
ENERGY LTD.
U.K.TEES VALLEY ENERGY FW
PROJECT
SA A105, A182
F304/F304L
2012 UP TO 12"FORGED FITTING
FORGED NOZZLE AT
DWG
MARUBENI
CORPORATION
ANSALDO CALDAIESINGAPORETEMBUSU BIOMASS COAL
COGENERATION PLANT
A182 F22, A105N
2012 UP TO 32"
UP TO 1.1/"
UP TO 3"
VIAR WELD
VIAR SOCK
FORGED FITTING
TUPRAS (TURKIYE
PETROL RAFINELERI
A.S.)
TECNICAS REUNIDAS
SA
TURKEYTUPRAS PROJECT A105, A182 F11,F22,
A182 F321, F304L,
F316L, F9,F5, A182
F91
2012 2"
2"
VIAR WELD-FLANGED
VIAR WELD
CHEVRON AUSTRALIA
PTY LTD
CHEVRONAUSTRALIAWHEATSTONE UPSTREAM
PROJECT SUBSEA
FLOWLINES AND
PIPELINES
A694 F65
2012 18" x 16", 18" x 18"BARRED TEEPTTEP INTERNATIONAL
LIMITED
LARSEN & TOUBROMYANMARZAWTIKA DEVELOPMENT
PROJECT
A694 F65
2012 UP TO 24"LATERAL TEEPTTEPSMOETHAILAND/
MYANMAR
ZAWTIKA DEVELOPMENT
PROJECT PHASE 1A
A105, A350 LF2
2011 UP TO 12"
14" AND 16"
UP TO 1.1/2"
UP TO 3"
VIAR WELD
VIAR SWEEP-INLETS
VIAR SOCK/THREAD
FORGED FITTING
ADNOC (ABU DHABI
NATIONAL OIL
COMPANY)
SAIPEM SAABU DHABIADGD SHAH GAS EPC2-3 A105N, A350 LF2,
A182 F316L A234
WPB A105N, A350
LF2, A182 F316L
A105N, A350 LF2
2011 UP TO 2"FORGED FITTINGAL KHAFJI JOINT
OPERATIONS
J.RAY MCDERMOTTKUWAIT - SAUDI
ARABIA
AL KHAFJI RATAWI WATER
INJECTION FACILITIES
PROJECT
A105N, A182 F316L
2011 UP TO 12"SUBSEA SWIVEL RING
FLANGE
STATOIL PETROLEUM
AS
SBM OFFSHORENORWAYASGARD A SWIVEL
REPLACEMENT PROJECT
A182 F51
2011 UP TO 2"
UP TO 4"
UPO TO 1.1/2"
UP TO 2"
VIAR WELD
VIAR SWEEP-INLETS
VIAR NIP-FLANGED
FORGED FITTING
PETRONAS/
PETROLIAM NATIONAL
BERHAD
PETROFAC
ENGINEERING LTD
MALAYSIABERANTAI PROJECT A182 F316L, A182
F51
2011 UP TO 2"
UP TO 6"
VIAR NIP-FLANGED
VIAR WELD
ABU DHABI COMPANY
(ADCO)
FOSTER WHEELER
AG
ABU DHABIBIDA AL QEMZAN FIELD
DEVELOPMENT PROJECT
(ADCO PROJECT NO.
P12383)
A105N, A182 F51
A694 F60
2011 UP TO 12"WN FLANGEBIEN DONG
PETROLEUM
OPERATING COMPANY /
PETROVIETNAM
WORLEYPARSONS
PETROVIETNAM
ENGINEERING JSC
VIETNAMBIEN DONG 1 PROJECT A350 LF2, A182 F51
2011 6" (VR62)CLAMP CONNECTOR
VIAR LOCK
TALISMAN MALAYSIAOFFSHORE WORKSMALAYSIABONGA RAYA UPGRADE
PROJECT
A183 F53
2011 10"
3" AND 6"
BW FITTING
VIAR LOCK
SALAMANDER ENERGY
(BUALUANG) LIMITED
THAI NIPPON STEELTHAILANDBUALUANG FIELD
DEVELOPMENT PROJECT
A105N, AISI 4140,
A420 WPL6
2011 UP TO 8"
28"
10", 24"
14", 28"
VIAR WELD
PIPE
WN FLANGE
FORGED FITTING
CARIGALI HESS
OPERATING COMPANY
THAI NIPPON STEELTHAILAND/
MALAYSIA
C-HESS BMB & CKD
WELLHEAD PLATFORMS
A694 F65
2011 UP TO 16"
UP TO 12"
UP TO 16"
16"
SUBSEA ANCHOR
FLANGE
SUBSEA INTEGRAL
RING TYPE BUCKLE
ARRESTORS
SUBSEA J-LAY
COLLARS
WN FLANGES
TOTAL E&P ANGOLASUBSEA 7 WEST
AFRICA SAS
ANGOLACLOV PROJECT A694 F65
2011 UP TO 3"
UP TO 1./2"
UP TO 1.1/2"
VIAR WELD
VIAR SOCK
FORGED FITTING
BANAGAS (BAHRAIN
NATIONAL GAS
COMPANY)
JGC GULF
INTERNATIONAL CO.
LTD.
BAHRAINCOMPRESSION STATION
(CS-9) PROJECT
A105N, A182 F321
2011 UP TO 12"
UP TO 1.1/2"
VIAR WELD
VIAR NIP
NAGARJUNA OIL
CORPORATION LIMITED
CB&I LUMMUS
CREST MAURITIUS
INDIACUDDALORE REFINERY
PROJECT
A105, A350 LF2,
A182-F5
REFERENCE LIST
YEAR PROJECT NAME ITEMS SUPPLIEDEND USER DIMENSIONSDESTINATION EPC CLIENT MATERIAL
2011 5"EQUAL TEE STUDDED
BLOCK API 6A 10000PSI
BX 155
PACIFIC DRILLINGSAMSUNGKOREA/ NEW
ZEALAND
DRILLING SHIP PACIFIC
SANTA ANA
UNS32760 (A182
F55)
2011 UP TO 2"
8"x2"
SINO 2012
VIAR NIP-FLANGED
VIAR LOCK WELD HUB
AIBEL ASSTATOILNORWAYEPCH GUDRUN PROJECT A182 F51,
F55,F44,F2, F316
2011 UP TO 2"
UP TO 1"
VIAR WELD
VIAR NIP-FLANGED
AL HASSAN
ENGINEERING & CO.
AL HASSAN
ENGINEERING & CO.
OMANFAHUD IC
INFRASTRUCTURE - CIVILS
EMC - LEKHWAIR
B564 UNS N06625
2011 UP TO 8"VIAR SWEEP-INLETSQATAR PETROLEUMPETROFACQATARGAS SWEETENING
FACILITIES PROJECT AT
MESAIEED & DUKHAN
A350 LF2
2011 UP TO 16"FORGED PIPE
FORGED FITTING
FLAT CAP
FORGED NOZZLE
YENI ELEKTRIK URETIM
A.S.
ANSALDO ENERGIATURKEYGEBZE POWER PLANT
(HRSG)
A105, A182 F91,
A182 F22
2011 UP TO 16"FORGED PIPE
FORGED FITTING
FLAT CAP
FORGED NOZZLE
YENI ELEKTRIK URETIM
A.S.
ANSALDO ENERGIATURKEYGEBZE POWER PLANT
(HRSG)
A105, A182 F91,
A182 F22
2011 UP TO 8"
UP TO 2"
UP TO 1"
SINO 2012
VIAR WELD
VIAR NIP-FLANGED
FORGED FITTING
ENI NORGEHHINORWAYGOLIAT PFSO
DEVELOPMENT PROJECT
A182 F51, F55
2011 18"FORGED BUCKLE
ARRESTOR
PETROLEO BRASILEIRO
SA (PETROBRAS)
SAIPEM DO BRASIL
SERVICOS DE
PRETROLEO LTDA
BRAZILGUARA' & LULA-NE
GASLINE PROJECT
A694 F65
2011 UP TO 2"
UP TO 1.1/2"
UP TO 2"
UP TO 3"
VIAR WELD
VIAR NIP
VIAR NIP-FLANGED
FORGED FITTING
SONATRACHABB S.P.A.ALGERIAHBK - P20027 A105, A350 LF2,
A183 F316L
2011 UP TO 2"VIAR SOCK
VIA NIP
VIAR SWEEP-INLETS
FORGED FITTING
VIAR NIP-FLANGED
SONATRACH-BP /
STATOIL
PETROFACALGERIAISG-SOUTHERN FIELD
DEVELOPMENT
PROJECT-IN SALAH GAS
ALGERIA
A105, A182 F316,
A350 LF2, A182 F51
2011 3" (3VR25), 4"
(4VR31)
UP TO 1.1/2"
UP TO 18"
UP TO 18"
UP TO 4"
UP TO 14"
SINO 2012
VIAR LOCK
VIAR NIP-FLANGED
WN FLANGE
BLIND FLANGE
BLEED RING
SPECTACLE BLIND
FLANGE
CARIGALI-PTTEPI
OPERATING COMPANY
SDN BHD (CPOC)
THAI NIPPON STEELTHAILAND/
MALAYSIA
JDA BLOCK B-17
DEVELOPMENT PROJECT
PHASE 2, JKB & MDE WHP
A182 F51, A182
F316L, A350 LF2,
A815 UNS S31803,
A403 WP316L,
A790
2011 UP TO 12"VIAR SWEEP-INLETS
VIAR WELD
TOTAL E&P UK LTD.TOTAL E&P UK LTD.UNITED
KINGDOM
LAGGAN TORMORE FIELD
DEVELOPMENT PROJECT
A694 F65
2011 UP TO 1.1./2"VIAR THREAD
FORGED FITTING
SAUDI ARABIAN MINING
COMPANY
MA'ADEN AND ALCOASAUDI ARABIAMA'ADEN PHOSPHATE AND
ALUMINIUM PROJECT
A182 F316L
2011 UP TO 3"
UP TO 2"
UP TO 2"
VIAR WELD
VIAR NIP-FLANGED
FORGED FITTING
BHP BILLITON
PETROLEUM PTY LTD
TECHNIP OCEANIA
PTY LTD
AUSTRALIAMACEDON PROJECT A105N, A350 LF2
2011 UP TO 6"VIAR LATGASCOPUNJ LLOYD LTDU.A.E.NITROGEN GENERATION
AND INJECTIN, PROJECT N.
5243
A182 F316L
2011 UP TO 10"VIAR WELD
PIPE
BW FITTING
FORGED FITTING
WN & BLIND FLANGE
VIAR-LOCK
CHEVRONCUELTHAILANDPHASE 43 INTEGRATED
WHP WELLHEAD
PLATFORM OIL & GAS AND
PIPELINES EPCI PROJECT
A790 UNS S31803,
A815 UNS S31803,
A182 F51
2011 4"
6"
CUSHION
TARGET TEE BW
EXXON MOBILOIL SEARCH LIMITED
(OSL) / JACOBS
AUSTRALIA/
PAPUA NEW
GUINEA
PNG LNG ASSOCIATED GAS
AND RELATED PROJECT
A105N A694 F52
2011 6", 10"TARGET TEEEXXON MOBILCB&IPAPUA NEW
GUINEA
PNG.LNG PROJECT A182 F51
REFERENCE LIST
YEAR PROJECT NAME ITEMS SUPPLIEDEND USER DIMENSIONSDESTINATION EPC CLIENT MATERIAL
2011 UP TO 1.1/2"FORGED FITTINGTOKUYAMA MALAYSIA
SDN. BHD,
CHIYODA
CORPORATION
MALAYSIA/
THAILAND
POLYCRYSTALLINE
SILICON PRODUCTION
FACILITIES PROJECT
A105, A182 F304,
A182 F316
2011 UP TO 2"
UP TO 3/4"
UP TO 1.1/2"
VIAR WELD
VIAR SOCK/THREAD
FORGED FITTING
JSC SIBUR HOLDING
TOBOLSK POLYMER,
LLC
LINDE-KCA-DRESDE
N
RUSSIAPROPANE
DEHYDROGENATION/POLY
PROPYLENE PROJECT
A182 F304L
2011 2.1/2", 3"
3"
1"
UP TO 14"
UP TO 2"
UP TO 14"
UP TO 8"
UP TO 1"
UP TO 14"
SINO 2012
VIAR LOCK
VIAR WELD
VIAR SOCK
BW FITTING
FORGED FITTING
WN FLANGE
BLIND FLANGE
SW FLANGE
PIPE
PTTEPTHAI NIPPON STEELTHAILANDPTTEP - ARTHIT AND
BONGKOT FIELD
DEVELOPMENT BUNDLED
PHASES
A182 F51, A182
F316L, A350 LF2,
A815 UNS S31803,
A403 WP316L, A790
UNS S31803, A
2011 UP TO 20"
12", 16"
UP TO 6"
12", 16", 20"
16", 20"
2"
16", 20"
12", 16"
SUBSEA WN FLANGE
SUBSEA SWIVEL RING
FLANGE
SUBSEA LWN FLANGE
SUBSEA PIIPES
SUBSEA BW FITTING
SUBSEA BLIND FLANGE
SUBSEA QUICK
OPENING CLOSURE
SUBSEA BARRED TEE
PTTEPTHAI NIPPON STEELTHAILANDPTTEP - ARTHIT AND
BONGKOT FIELD
DEVELOPMENT BUNDLED
PHASES (PIG TR
A694 F60 AND A694
F60 WITH
CLADDING
2011 UP TO 6"
UP TO 1.1/2"
UP TO 4"
VIAR WELD
VIAR NIP
FORGED FITTING
CONSORTIUM
TRAD-CCC
ADCO (ABU DHABI
COMPANY FOR
ONSHORE OIL
OPERATIONS)
ABU DHABISAHIL & SHAH FULL FIELDS
DEVELOPMENT PROJECT
A105N, A350LF2,
A182 F316, A182
F53, UNS N08825,
A105N
2011 UP TO 16"VIAR LOCKENI S.P.A.SAIPEMITALYSAIPEM SANNAZZARO (PV)
P31770
A182 F22, A182
F347H
2011 UP TO 2"
UP TO 2"
UP TO 1.1/2"
SINO 2012
FORGED FITTING
VIAR WELD
VIAR SOCK/THREAD
EXXON NEFTEGAS
LIMITED
DSMERUSSIASAKHALIN - 1 PROJECT,
ARKUTUN- DAGI FIELD
DEVELOPMENT
A182 F51, A182 F53,
UNS N06625
2011 UP TO 16"
UP TO 4"
UP TO 3"
SINO 2012
VIAR WELD, VIAR
SOCK
VIAR LAT, VIAR ELB
FORGED FITTING
SAMREFWORLEY PARSONSSAUDI ARABIASAMREF CLEAN FUELS
PROJECT
A105N, A182
F304L,F316L, A182
F11, A182 F321,
A182 F347, F5, UNS
N08825, UNS C70
2011 UP TO 4"
UP TO 2"
VIAR WELD
FORGED FITTING
EXXONMOBIL ASIA
PACIFIC LTD.
JGC CORPORATIONSINGAPORESINGAPORE
HYDRO-DESULFURIZATION
PROJECT
A105N, A182 F53,
A182 F60, A182
F304L/F316L/F321,
A182 F5, A182 F11,
A182 F22,
2011 UP TO 18"
UP TO 3"
UP TO 8"
UP TO 2"
UP TO 3"
VIAR WELD
VIAR SOCK
VIAR SWEEP-INLETS
VIAR NIP-FLANGED
FORGED FITTING
TURKMENGASPETROFAC
INTERNATIONAL
TURKMENISTANSOUTH YOLOTEN GAS
FIELD DEVELOPMENT
PROJECT
A105N, A350 LF2,
A182 F316L, INC.
825, INC. 625
2011 12"SUBSEA SWIVEL RING
FLANGE
SUBSEA WN FLANGE
CUU LONG JOINT
OPERATING COMPANY
NIPPON STEEL
ENGINEERING
INDONESIASU TU TRANG LTPTP
WELLHEAD PLATFORM
AND PIPELINE
A694 F65
2011 4", 6"
8", 10", 12"
TARGET TEE
LATERAL TEE
PETROVIETMAN/ PTSCPTSC MECHANICAL &
CONSTRUCTION
VIETNAMSU TU TRANG LTPTP
WELLHEAD PLATFORM
AND PIPELINE, CONTRACT
N. CLJOC-2008-DEV-003
A182 F51, A105N
2011 12"ANCHOR FLANGEABU DHABI GAS
INDUSTRIES LTD
(GASCO)
ALSA ENGINEERING
& CONSTRUCTION
CO. LLC
ABU DHABISUPPL Y OF SALES GAS TO
MASDAR-SHAMS 1
A694 F60
2011 20"ANCHOR FLANGEARKAN BUILDING
MATERIALS COMPANY
NPCC/JP KENNY LTDABU DHABISUPPLY OF GAS TO NEW
AL AIN CEMENT PLANT FOR
ARKAN
A694 F60
2011 UP TO 14"NOZZLESAUDI ARABIAN OIL
COMPANY (ARAMCO)
SAMSUNGSAUDI ARABIAWASIT 1-2-3-4 A105
REFERENCE LIST
YEAR PROJECT NAME ITEMS SUPPLIEDEND USER DIMENSIONSDESTINATION EPC CLIENT MATERIAL
2011 UP TO 6"
UP TO 1.1/2"
UP TO 2"
SINO 2012
VIAR WELD
VIAR SOCK
FORGED FITTING
PTTEP INTERNATIONAL
LIMITED
LARSEN & TOUBROMYANMARZAWTIKA DEVELOPMENT
PROJECT
A105N,
A350 LF2,
A694 F60,
A182 F316L
2010 UP TO 2"
UP TO 4"
VIAR NIP-FLANGED
VIAR WELD
J.RAY MC DERMOTT
MIDDLE EAST INC.
ADMA OPCOU.A.E.ADMA KAZUM WATER
INJECTION UPGRADE
PROJECT
A 105N, A694 F60
2010 UP TO 5"
UP TO 1.1/2"
A420 WPL6, A350
LF2
VIAR WELD
VIAR SOCK/THREAD
FORGED FITTING
ENI/SAIPEMDUBAI DRYDOCKS
GOV
ITALYAQUILA PHASE 2 A105N, A182 F316L,
A234 WPB, A420
WPL6, A350 LF2
2010 UP TO 3"
UP TO 10"
1"
BLIND FLANGE
WN FLANGE
SW FLANGE
PTTEPTHAI NIPPON STEELTHAILANDARTHIT 1D WELLHEAD
PLATFORM PROJECT
A182 F51
2010 UP TO 48"ANCHOR FLANGE
BARRED
TEE/EXTRUDED
REDUCING TEE
TEST RING
ABU DHABI GAS
INDUSTRIES LTD
(GASCO)
TECHNIP FRANCE -
ABU DHABI
ABU DHABIASAB 3 (A3) PROJECT A105N, A860 WPHY
60, A234 WPB
2010 24"
16"x16", 22"x20",
18"x18", 8"x8",
24"x18"
SUB SEA WN FLANGE
SUB SEA SWIVEL RING
FLANGE
SUB SEA BARRED TEE
PTTEPHHI (HYUNDAI HEAVY
INDUSTRIES)
THAILANDBONGKOT FIELD
DEVELOPMENT PROJECT
4A
A694 F60
2010 UP TO 10"
UP TO 2"
SINO 2011
VIAR WELD
FORGED FITTING
ENELVENFERROSTAL
INDUSTRIAL
PROJECTS/ ENELVEN
VENEZUELACICLO COMBINADO
BACHAQUERO & TAMARE
A105N, A182 F91,
A182 F11, A182
F321/321H
2010 UP TO 24"
UP TO 2"
VIAR WELD
VIAR LAT
FORGED FITTING
OPAL(ONGC PETRO
ADDITIONS LTD)
LINDE ENGINEERING/
SAMSUNG
ENGINEERING
INDIADAHEJ PETROCHEMICAL
COMPLEX
A105N, A182 F11,
A182 316L, A182
F22
2010 UPTO 1"
UP TO 3/4"
UP TO 2"
UP TO 3"
2"
VIAR NIP-FLANGED
VIAR SOCK
VIAR WELD
FORGED FITTING
VIAR SWEEP-INLETS
GROUPEMENT
BERKINE ALGERIA
PETROFACALGERIAEL MERK FIELD
DEVELOPMENT PROJECT,
CENTRAL PROCESSING
FACILITIES AND TELECOM
A105, A182 F51,
A182 F316L
2010 UP TO 3"VIAR WELD
VIAR NIP
FORGED FITITNGS
GALP
ENERGIA-PETROGAL
FLUORPORTUGALFLUOR PORTO OIL
REFINERY CONVERSION
PROJECT N.A3SI
A105N, A182 F316L
2010 UP TO 8"
UP TO 2"
VIAR WELD
FORGED FITTING
VIAR NIP-FLANGED
PETROBRASMODECBRAZILFPSO CIDADE DE SAO
PAULO MV-23
A105N, A182 F316L
2010 UP TO 12"
UP TO 10"
NORSOK COMPACT
FLANGE
BARRED TEE
TEST RING
PREMIER OIL VIETNAM
OFFSHORE
EMAS
CONSTRUCTION &
PRODUCTION
VIETNAMFPSO-BLOCK 12W
DEVELOPMENT PROJECT
A105N, A182 F51,
A694 F60, A694 F65,
A694 F70
2010 UP TO 6"
UP TO 1"
UP TO 2"
VIAR WELD
VIAR SOCK
FORGED FITTING
OFFSHORE LNG
TOSCANA
SAIPEMITALYFRSU LIVORNO (VESSEL #
S - 5780)
A350 LF2, A182
F316, A105N, A403
WP316L, A182 F22
2010 UP TO 2"
UP TO 36"
UP TO 2"
VIAR THREAD/SOCK
VIAR WELD / VIAR LAT
FORGED FITTING
GASCO - ABU DHABIJGC - TECNIMONT
JOINT VENTURE
ABU DHABIHABSHAN 5 PROCESS
PLANT PROJECT
A350 LF2, A105N,
A182 F316L, A182
F11
2010 10"
12", 2"
FUTURE TAP FLANGE
SWIVEL RING FLANGE
WN AND BLIND
FLANGE
PETROVIETNAM GAS
CORPORATION (PVGAS)
HYUNDAI HEAVY
INDUTRIES
(HHI)/PETROVIETMAN
GAS CORPORATON
(PVGAS)
VIETNAMHST-TGT-BH- GAS
PIPELINE PROJECT
A694 F60
2010 UP TO 2"
UP TO 24"
UP TO 2"
SINO 2011
VIAR SOCK/THREAD
VIAR WELD
FORGED FITTING
SAUDI ARAMCO/TOTALTECHINP ITALYSAUDI ARABIAJUBAIL EXPORT REFINERY
PROJECT 2A/5A
A105N, ALLOY 20,
A183 F304/F316,
A182 F11, A182 F22
2010 UP TO 4"
3/4"
VIAR WELD
VIAR WELD-FLANGE
LASMO OIL PAKISTAN
LTD
FOSTER WHEELER
PETROLEUM
DEVELOPMENT
PAKISTANKADANVARI FIELD
DEVELOPMENT PROJECT
A105, A694 F60
2010 UP TO 3"
UP TO 1.1/2"
UP TO 1"
VIAR WELD
VIAR SOCK/THREAD
FORGED FITTING
KHALDA PETROLEUM
COMPANY
KHALDA PETROLEUM
COMPANY
EGYPTKALABSHA 40000 BOPD OIL
FACILITY PROJECT
A105N, A182 F55,
A182 F316
REFERENCE LIST
YEAR PROJECT NAME ITEMS SUPPLIEDEND USER DIMENSIONSDESTINATION EPC CLIENT MATERIAL
2010 UP TO 24"
UP TO 2"
UP TO 2"
VIAR WELD
VIAR SOCK/THREAD
FORGED FITTING
ABU DHABI POLYMERS
COMPANY LIMITED
LINDE ENGINEERING/
BOROUGE
U.A.E.LINDE PROJECT - RUWAIS
2/3 - ETHYLENE PLANT
EU2/EU3
SA A105N, A182
F304L/F316L , A182
F11, A182 F91, A350
LF2
2010 UP TO 1.5"
UP TO 4"
FORGED FITTING
VIAR WELD
ELIXIER, ADNOCLINDE ENGINEERINGABU DHABIMIRFA 1 PROJECT -
NITROGEN PLANT
A182 F304L,
A182 F316L, A105
2010 UP TO 14"
UP TO 2"
UP TO 4"
16"
SINO 2011
VIAR WELD
VIAR SOCK/THREAD
FORGED FITTING
BW FITTING
SLOVENSKE
ELEKTRARNE
ENEL/ SLOVENSKE
ELEKTRARNE
SLOVAKIAMOCHOVCE POWER
PLANT, COMPLETION OF
UNIT 3 AND 4
A105N, A350 LF2,
A182 F316LA105N,
A350 LF2, A182
F304L, A182 F316L,
A182 F321, A
2010 14"
UP TO 12"
UP TO 12"
14"
6"
UP TO 14"
SUB SEA NORSOK
COMPACT FLANGE
SUB SEA WN & BLIND
FLANGE
SUB SEA VIAR
WELDOFLANGE
SUB SEA BARRED TEE
SUB SEA FORGED
FITTING
SUB SEA TEST RING
PTTEP AATHAI NIPPON STEEL
ENGINEERING &
CONSTRUCTION
CORPORATION
LIMITED
AUSTRALIAMONTARA DEVELOPMENT
PROJECT - REPLACEMENT
OF WELLHEAD PLATFORM
DECK
A694 F65 AND A694
F65 WITH
CLADDING
2010
UP TO 4"
VIAR WELD
VIAR THREAD
VIAR NIP
FORGED FITITNG
NESTE OIL -
SINGAPORE
TECHNIPSINGAPORENESTE OIL OYJ PROJECT
2308 - SINGAPORE NExBTL
PLANT TECHNIP ITALY.
CONTRACT N° 2
A350 LF2, A182
F316L/F304L, A815
UNS S31803
2010 UP TO 8"VIAR WELD/VIAR
THREAD
QATAR GOVERNMENTBECHTEL
CORPORATION
QATARNEW DOHA
INTERNATIONAL AIRPORT
PROJECT CP 18
PASSENGER TERMINAL
A105N
2010 UP TO 36"
80"
LWN FLANGE
WN AND BLIND
FLANGE
BELL FORGING
RUSVINYLSOLVAY/SIBUR LLCRUSSIANIJNI-NOVGOROD VNYLS
ITEGRATED PLANT
A350 LF2
2010 UP TO 12"VIAR WELDPETROLEUM
DEVELOPMENT OMAN
AL-HASSAN
ENGINEERING
SOUTH OMANPDO-NIMR C-FULL FIELD
WATER INJECTION
PROJECT
A182 F51
2010 UP TO 3"
UP TO 10"
UP TO 10"
UP TO 10"
3"
VIAR WELD
PIPE
BW FITTING
WN & BLIND FLANGE
VIAR-LOCK
CHEVRONCUELTHAILANDPHASE 39 INTEGRATED
WHP WELLHEAD
PLATFORM OIL & GAS AND
PIPELINES EPCI PROJECT
A182 F51, A790
UNS S31803, A815
UNS S31803
2010 UP TO 16"SWIVEL RING FLANGE,
WN AND BLIND
FLANGE
CHEVRONCUELTHAILANDPHASE 39/43 INTEGRATED
WHP WELLHEAD
PLATFORM AND PIPELINES
PROJECT
A694 F52, A694 F52
WITH CLADDING
INCONEL 625
2010 UP TO 3"
UP TO 10"
UP TO 1"
UP TO 10"
UP TO 3"
SINO 2011
VIAR WELD
PIPE
BW FITTING
FORGED FITTING
WN & BLIND FLANGE
VIAR-LOCK
CHEVRONCUELTHAILANDPHASE 41 & PHASE 42
INTEGRATED WHP
WELLHEAD PLATFORM OIL
& GAS AND PIPELINES EPC
A182 F51
A790 UNS S31803
A815 UNS S31803
2010 UP TO 30"
UP TO 28"
SUBSEA SWIVEL RING
FLANGE
SUBSEA WN FLANGE
SUBSEA BLIND FLANGE
TEST RING
PTT PCLHYUNDAI HEAVY
INDUTRIES (HHI)
THAILANDPTT OFFSHORE GAS SPUR
LINE PROJECT
A694 F65, A694 F70
2010 UP TO 1"
UP TO 14"
CENTERING RODS
TRANSITION RING
QATAR FERTILIZER
COMPANY
ENI SNAMPROGETTI -
SOFINTER, HYUNDAI
ENGINEERING &
CONSTRUCTION
QATARQAFCO 5 - AMMONIA AND
UREA PLANT PROJECT
A105, A182 F316L
2010 1.1/2"FORGED FITTINGQATAR SHELL GTL LTD.QATAR SHELL GTL
LTD.
QATARQATAR SHELL PEARL GTL
LTD, PEARL GTL PROJECT
B564 UNS N06625
2010 UP TO 40"VIAR O'LETSQUEENSLAND GAS
COMPANY (QGC)
BECHTEL OIL,GAS
AND CHEMICALS,
INC.
AUSTRALIAQUEENSLAND CURTIS LNG
PROJECT
A105N, A350 LF2,
A182 F304L
REFERENCE LIST
YEAR PROJECT NAME ITEMS SUPPLIEDEND USER DIMENSIONSDESTINATION EPC CLIENT MATERIAL
2010 UP TO 6"VIAR WELDQATAR PETROLEUMLARSEN & TOUBROQATARRAS LAFFAN QATAR SITE
GAS SUPPLY TO STATION V
AND FACILITY C (GSVC)
PROJECT
A105N, A350 LF2,
A694 F65
2010 UP TO 28"ANCHOR FLANGESONATRACHSNC LAVALIN
INTERNATIONAL/
SONATRACH
ALGERIARHOURDE NOUSS QH A182 F51, A694 F70
2010 10", 12", 18", 20"
18", 24"
TRANSITION PIECE
WYE PIECE
BORASCO ELEKTRIK
URETIM SANAYI VE
TICARET A.S.
METKA S.A.TURKEYSAMSUN 870 MW CCPP A182 F22, A182 F91
2010 UP TO 1.1/2"VIAR NIP-FLANGEDTOTAL E&P INDONESIETOTALINDONESIASOUTH MAHAKAM FIELD
DEVELOPMENT PROJECT,
PHASE 1&2
A105N, A182 F321
2010 24"x24"x24"
24"
ASYMMETRICAL
PIGGABLE SUBSEA
WYE
TEST RING
TOTAL E&P INDONESIEPT SINGGAR DORIS
ENGINEERING
INDONESIASOUTH MAHAKAM FIELD
DEVELOPMENT PROJECT,
PHASE 1&2
A694 F65
2010 UP TO 2"
UP TO 1.1/2"
UP TO 4"
VIAR SOCK
VIAR THREAD
VIAR ELB
FORGED FITTING
ESSOFOSTER WHEELERNEW ZEALANDSRIRACHA CLEAN FUELS
PROJECT
A105N, A182 F5,
A182 F60, A182
F304L, A790 UNS
S32205
2010 UP TO 2"
UP TO 3"
VIAR WELD
FORGED FITTING
QAPCOUHDEQATARUHDE - QAPCO QATAR
PETROCHEMICAL
COMPANY UAN 03-3124-020
LDPE3 PLANT PROJECT
A182 F316L, A105
HDG
2010 UP TO 4"FORGED FITTINGPETROBRASANSALDO CALDAIEBRASILUTE SEPE' TIARAJU A105N, A182 F11,
A182 F22, A182 F91
2010 UP TO 1"
3"
VIAR WELD
PLUGS TO DESIGN
THIESS DEGREMONT
JOINT VENTURE
PARSONS
BRINCKERHOFF
BECA JOINT
VENTURE
AUSTRALIAVICTORIAN DESALINATION
PLANT PROJECT
A182 F316L, A182
F51
2010 UP TO 2"
2"
VIAR WELD
FORGED FITTING
WEST NATUNA GROUPINTEC ENGINEERINGINDONESIA TO
SINGAPORE
WEST NATUNA GAS
PIPELINE PROJECT
A694 F65-A105N
2010 UP TO 8"VIAR WELD
VIAR NIP-FLANGED
VIAR NIP
PIPE
VIAR SOCK
BHP PETROLEUMBHP BILLITONPAKISTANZAMZAMA GAS PLANT
FRONT END
COMPRESSION PROJECT
A182 F51, A105N,
A350 LF2
2009 6"
UP TO 12"
SINO 2010
FORGED FITTING
VIAR WELD
TR/ELEFSINA
(HELLENIC PETROLEUM
REFINERY)
TRANSTEL
ENGINEERING
GREECE01990 HELPE-ELEFSIS
REFINERY UPGRADE
PROJECT
A106B, A350
LF2-A182
F304L/F316L-SB/B7
29 UNS
N08020-A790 UNS
S31803- A350 LF2, A
2009 UP TO 6"VIAR-NIP FLANGEDADCO - ABU DHABITHROUGH TRADING
COMPANY
ABU DHABIADCO (ABU DHABI CO. FOR
ONSHORE OIL
OPERATIONS)
MAINTENANCE ZONE
A105N
2009 A350 LF22"FORGED FITTINGER SAI CASPIAN
CONTRACTOR LLC
REPUBLIC OF
KAZAKHSTAN
AGIP KAZAKHSTAN NEW
PIPE RACKS
A350 LF2
2009 UP TO 12"
UP TO 1"
VIAR WELD
FORGED FITTING
VIAR ELB
NATIONAL GRID - GRAIN
LNG LTD
CB & IENGLANDAIR PRODUCTS ISLE OF
GRAIN - KONIAMBO
PROJECT - LNG IMPORT
TERMINAL
A350 LF2
2009 UP TO 6"
UP TO 2"
VIAR WELD
FORGED FITTING
AIR LIQUIDE INDUSTRIE
B.V. ROTTERDAM
THROUGH TRADING
COMPANY
THE
NETHERLANDS
AL HERACLES ROTTERDAM
PROJECT: 69796
A105N A182 F11
F304L
2009 16"SUB SEA PIGGABLE
WYES & TEST RING
PTTEPKBR - THAI NIPPON
STEEL ENGINEERING
THAILANDARTHIT WELLHEAD
PLATFORM PROJECT
PHASE 1B
A694 F60
2009 UP TO 1"FORGED FITTINGPTTEPCUEL/ WORLEY
PARSONS
THAILANDARTHIT WELLHEAD
PLATFORM PROJECT
PHASE 1C
A790 UNS S31803
REFERENCE LIST
YEAR PROJECT NAME ITEMS SUPPLIEDEND USER DIMENSIONSDESTINATION EPC CLIENT MATERIAL
2009 UP TO 4"
UP TO 1.25"
UP TO 2"
WN FLANGE
SW FLANGE
FORGED FITTING
CSBP WESTFARMERSEEW, ASIA PACIFIC
STEEL PTE. LTD
AUSTRALIABOILER SHUTDOWN
PROJECT CSBP BOILER
PROJECT CRMO
7502074657
A182 F11, A105N,
A182 F304L
2009 UP TO 16"
UP TO 2"
BW FITTING
FORGED FITTING
PTTEPTHAI NIPPON STEELTHAILANDBONGKOT FIELD
DEVELOPMENT PROJECT -
PHASE 3H & 4A WELLHEAD
PLATFORMS FOR
PROCURE
A815 UNS
S31803-A182 F51
2009 8" 16" 22" 24"
8" 16" 20" 22" 24"
3/4" 2" 4"
16"x16", 22"x20",
18"x18", 8"x8",
24"x18"
SUB-SEA TEST RING
SUB-SEA WN FLANGE
SUB-SEA LWN FLANGE
SUB-SEA BARRED TEE
PTT EXPLORATION &
PRODUCTION
THAILAND
HYUNDAI HEAVY
INDUSTRIES/ PTTEP
THAILANDBONGKOT FIELD
DEVELOPMENT PROJECT -
PHASE 4A
A694 F60
2009 UP TO 36"VIAR WELDNAJMAT ABU DHABI
DEVELOPMENT, AL
REEM ISLAND - ABU
DHABI
REEM DEVELOPERSABU DHABICHILLED WATER PIPING
NETWORK
A105N
2009 UP TO 2"
UP TO 1"
UP TO 2"
VIAR WELD
VIAR THREAD
NOZZLE
ESSENTALSTOM POWER -
BHR ENGINEERING &
CONSTRUCTION
THE
NETHERLANDS
COMBINED CYCLE POWER
PLANT CLAUS CENTRALE
CLAUS C
15NICUMONB5,
A182 F91, A182
F11, A182 F22
2009 UP TO 3"
UP TO 2"
VIAR WELD
FORGED FITTING
FORGED FITTINGAPACHE - CLOUGHTHAILANDDEVIL CREEK PROJECT
PETCHEM - LNG ONSHORE
GAS PLANT
A105N, A182 F316L,
A350 LF2
2009 UP TO 4"
UP TO 8"
UP TO 2"
VIAR -SWEEP INLETS
VIAR WELD
FORGED FITTING
PETRO CANADA
PALMYRA B.V. (PCP)
PETROFAC E &C
INTERNATIONAL LTD.
SYRIAEBLA GAS PROJECT
SURFACE FACILITIES
A182 F316L,
A182 F51,
A694 F65
2009 10"WN FLANGEEDFEDF CITFRANCEEDF ENERGY
BLENOD-LES-PONT-A-MOU
SSON POWER PLANT
PROJECT
A105N, A182 F11,
A182 F22, A182 F91
2009 UP TO 2"
UP TO 18"
WELD BOSSES
BW FITTING
EDFEDF CITENGLANDEDF ENERGY POWER
STATION WEST BURTON
SITE (NOTTINGHAM)
A105N A182 F91
2009 UP TO 12"
UP TO 18"
UP TO 2"
UP TO 2"
SINO 2010
VIAR SOCK
VIAR WELD
VIAR NIP-FLANGED
FORGED FITTING
EL MERK - ALGERIAABB SPA - PETROJET
- SARPI
ALGERIAEL MERK OIL AND GAS
FIELD DEVELOPMENT
OFFSITE LOT 3 & 4
A105N, A694 F65,
A350 LF2, A694 F70,
A182 F304,
AP5L GR B
2009 UP TO 2"VIAR WELDHITACHI POWERTRACTABEL
ENGINEERING SUEZ
ELECTRABEL LP PROJECT
OF HITACHI
A182 F321, A106,
A182 F22, A182
F304
2009 4"
24" X 4"
24" X 6"
4"
SPECIALLY DESIGNED
NOZZLE FOR HP
STEAM SAFETY LINE
SPECIALLY DESIGNED
FLANGED NOZZLE FOR
RH ATTEMPORATOR
LINE
SPECIALLY DESIGNED
FLANGED NOZZLE FOR
CRH STEAM SAFETY
LINE
SPECIALLY DESIGNED
FLANGED NOZZLE FOR
HP ATTEMPORATOR
LINE
ENECO - DONG
ENERGY
SIEMENS ENERGYTHE
NETHERLANDS
ENECOGEN PROJECT -
870MW POWER PLANT
PROJECT
A182 F22, A182 F11,
A182 F91
2009 UP TO 10"VIAR WELDENELVEN C.A. ENERGIA
ELECTRICA DE
VENEZUELA
KOCH DE PORTUGAL
LDA
VENEZUELAENELVEN, BACHAQUERO/
VENEZUELA COMBINED
CYCLE POWER PLANT.
PROJECT N°: 501-09-90
A182 F91, A182 F11,
A105N
2009 UP TO 16"
UP TO 2"
VIAR WELD
FORGED FITTING
QATAR PETROLEUMPETROGAS PIPING
MIDDLE EAST FZCO
QATAREPIC OF GAS SUPPLY TO
STATION V & FACILITY C
(GSVC) PROJECT QATAR
PETROLEUM EPIC
A105N, A694 F65
REFERENCE LIST
YEAR PROJECT NAME ITEMS SUPPLIEDEND USER DIMENSIONSDESTINATION EPC CLIENT MATERIAL
2009 UP TO 1.5"VIAR WELDQATAR PETROLEUMTHROUGH TRADING
COMPANY
QATARERGON PROJECT A105N
2009 UP TO 2"
UP TO 20"
VIAR THREAD
VIAR WELD
VOLTAS LIMITED -
DUBAI
ECONOSTO MIDEAST
BV
DUBAIFERRARI EXPERIENCE -
CHILLED WATER PLANT AIR
CONDITIONING
CONNECTION
A105N
2009 UP TO 8"
UP TO 3"
VIAR WELD
PIPE NIPPLE
GALP
ENERGIA-PETROGAL -
PETROGAL S. A
FLUORPORTUGALFLUOR PORTO REFINERY
CONVERSION PROJECT
N.A3SI
A105N, A182 F316L,
A182 F9, API 5LB,
A234 WP9, A182
F317L, API 5LBHD
2009 UP TO 8"
UP TO 1,5"
UP TO 10"
VIAR WELD
VIAR SOCK
SPECIAL PIPE NIPPLE
SONATRACHSONATRACHALGERIAGAZODUC GK3 48" HASSI
R'MEL-SKIKDA-EL KALA
GAS PIPELINE LOT 3
A694 F60, A694 F70
2009 3", 10", 12", 16"SUB SEA BLIND
FLANGE
SUB SEA NORSOK
SWIVEL COMPACT
FLANGE
MERSKSMOE- KBR
ENGINEERING
SINGAPOREHALFDAN B PHASE IV HBD
OFFSHORE PLATFORM
DEVELOPEMENT PROJECT
A694 F60
2009 2"VIAR-NIP FLANGEDBRITISH GAS TUNISIA
LTD, ENTREPRISE
TUNISIENNE
D'ACTIVITES
PETROLIERES (ETAP)
PETROFAC E &C
INTERNATIONAL LTD.
TUNISIAHASDRUBAL GAS
PROCESSING PLANT AND
LPG FACILITY HASDRUBAL
ONSHORE GAS
PROCESSSIN
A350 LF2
2009 2",3"HALF COUPLINGTECNICAS REUNIDAS/
HELLENIC PETROLEUM
THROUGH TRADING
COMPANY
GREECEHELLENIC PETROLEUM
REFINERY PROJECT -
HYDRO CRACKER UNIT
A182 F347H
2009 UP TO 6"VIAR WELDENCANA - CANADASBM OFFSHORECANADAHI39431-MOBILE
OFFSHORE PRODUCTION
UNIT ENCANA DEEP
PANUKE PROJECT
A105N, A350 LF2,
A182 F316L, B564
UNS N06625
2009 1"
UP TO 16"
VIAR NIP-FLANGED
WN FLANGE
EXXONMOBIL CANADA,
CHEVRON CANADA
RESOURCES,
PETRO-CANADA
PSN - NOC
(NEWFOUNDLAND
OFFSHORE
CONTRACTORS)
CANADAHIBERNIA OFFSHORE OIL
FIELD DEVELOPMENT
PROJECT
A350 LF2
2009 UP TO 6"
UP TO 8"
UP TO 1.5"
UP TO 3"
VIAR WELD
VIAR -SWEEP INLETS
VIAR NIP
FORGED FITTING
HAYAN PETROLEUM
CO.
PETROFAC E &C
INTERNATIONAL LTD.
SYRIAJIHAR STAGE 3 PROJECT -
SCR UNIT FOR HYDROGEN
PLANT
A182 F51, A105N,
A182 F304L/F316L,
A350 LF2
2009 4"VIAR LOCKTOTALENICONGOLIBONDO DECK PROJECT -
OFFSHORE FIELD
DEVELOPMENT PROJECT -
HUB CONNECTION
A694 F60
2009 UP TO 2"
UP TO 2"
UP TO 26"
VIAR-NIP FLANGED
WELD BOSSE
BW FITTING
SHELL EASTERN
PETROLEUM PTE LTD.
SHELL/ CHIYODA
SINGAPORE
SINGAPORELONG RESIDUE CATALYTIC
CRACKING UNIT REVAMP
PROJECT SHELL EASTERN
PETROLEUM
A182 F316 A182
F304H
2009 UP TO 12"VIAR WELDGOVERNMENT OF ABU
DHABI
REEM DEVELOPERSABU DHABINAJMAT ABU DHABI
DEVELOPMENT PROJECT -
AL REEM ISLAND
A105N
2009 UP TO 20"
UP TO 1,5"
VIAR WELD
VIAR NIP
PIPE NIPPLE
NESTE OIL -
SINGAPORE
TECHNIPSINGAPORENESTE OIL OYJ PROJECT
2308 - SINGAPORE NExBTL
PLANT TECHNIP ITALY.
CONTRACT N° 2
A182 F22, A182 F51,
A182 F304L, A182
F316L, A350 LF2,
B564 UNS N06625,
A182 F321
2009 UP TO 2"
4"
UP TO 1"
VIAR WELD
PIPE NIPPLE
VIAR THREAD
SHENHUA NINGXIA
COAL INDUSTRY
GROUP CO. LTD.
SEDIN ENGINEERING
CO. LTD.
CHINANINGXIA COAL BASED
PROPYLENE PROJECT
SHENHUA INTERNATIONAL
LTD.
B564 UNS N06600
2009 UP TO 8"
UP TO 4"
UP TO 1"
UP TO 2"
VIAR WELD
CONC. REDUCERS
WL BOSS
VIAR SOCK
NUON MAGNUMMITSUBISHI HEAVY
INDUSTRIES
THE
NETHERLANDS
NUON MAGNUM IGCC
PROJECT COMBINED
CYCLE UNIT (POWER
PLANT)
A105, A182 F316L
2009 24"SPECTACLE BLIND
FLANGE
AO GAMA GUC
SISTEMLERI
MUHENDISLIK VE
TAAHHUT
GAMA GUC
SISTEMLERI,
GENERAL ELECTRIC
RUSSIAOGK-4 SURGUT 800 MW
COMBINED CYCLE POWER
PLANT
A516 GR.60
REFERENCE LIST
YEAR PROJECT NAME ITEMS SUPPLIEDEND USER DIMENSIONSDESTINATION EPC CLIENT MATERIAL
2009 UP TO 6"
UP TO 1.5"
UP TO 2"
SINO 2010
VIAR WELD
VIAR SOCK
VIAR ELB
FORGED FITTING
OLT OFFSHORE LNG
TOSCANA
SAIPEMITALYOLT FLOATING STORAGE
RE-GASIFICATION UNIT
LIVORNO PROJECT - JOB
033470 SAIPEM -
A182 F316L, A350
LF2
2009 1", 2"
8", 10"
2"
VIAR THREAD
VIAR WELD
VIAR LAT
RWE POWER PLC.ALSTOMWALESPEMBROKE L9 POWER
PLANT PROJECT
A182 F11, A182
F91-A182 F22
2009 UP TO 3"
UP TO 10"
3"
VIAR WELD
PIPE
BW FITTING
WN & BLIND FLANGE
CHEVRONCUELTHAILANDPHASE 37 INTEGRATED
WHP WELLHEAD
PLATFORM OIL & GAS AND
PIPELINES EPCI PROJECT
A182 F51, A790
UNS S31803, A815
UNS S31803
2009 UP TO 2"
VIAR-NIP FLANGED
WOODSIDE BURRUP
PTY LTD.
FOSTER WHEELER -
WORLEY PARSONS
AUSTRALIAPLUTO LNG GAS FIELD
DEVELOPMENT PROJECT
A350 LF2
2009 3"FORGED FITTINGQUEIROZ GALVAO
OLEO E GAS S.A
PETROBRASBRAZILPROJECT MODIFICATION
OF RIG 1 LONE STAR
A105N
2009 1"VIAR SOCK FLATQATAR PETROLEUM
(QP) AND HYDRO
ALUMINIUM OF
NORWAY
ABBQATARQATALUM ALUMINIUM
SMELTER
A105N
2009 8"
UP TO 1"
VIAR WELD
VIAR SOCK
WELLITAH OIL & GAS BV
LYBIAN BRANCH, AGIP
GAS BV
ENI-SAIPEM /
HYUNDAI HEAVY
INDUSTRIES
LYBIASABRATHA - PRODUCTION
ENHANCEMENT PROJECT
SAIPEM ENI
B564 UNS N06625
2009
UP TO 1.5"
UP TO 1"
UP TO 1.5"
VIAR WELD
VIAR SOCK
VIAR THREAD
SWAGE NIPPLE
VIAR ELB
SAUDI KAYAN
PETROCHEMICAL CO.
FLUOR - TECNICAS
REUNIDAS- SABIC
SAUDI ARABIASAUDI KAYAN CRACKER
PROJECT PHENOLIC
FACILITIES - TECNICAS
REUNIDAS REFINING PRO
A182 F304/304L,
A182 F316/316L,
A105N, A234 WPB,
A403 WP316
2009 UP TO 28"VIAR WELDSAUDI ELECTRICITY
COMPANY
ALSTOM-AM ALISSA-
KULJIAN
ENGINEERING
SAUDI ARABIASHOIBA POWER PLANT
STAGE III
A105
2009 12"ANCHOR FLANGEPT. MEDCO E & P
LEMATANG PT. INTI
KARYA PERSADA
TEHNICK (IKPT)
LUDIN PETROLEUMINDONESIASINGA GAS DEVELOPMENT
PROJECT
A694 F60
2009 UP TO 4"
UP TO 2"
UP TO 1.5"
UP TO 4"
VIAR WELD
VIAR SOCK
VIAR THREAD
ECC SWAGE NIPPLE
SWAGE NIPPLE
EXXON MOBIL
CHEMICAL CO. -
SINGAPORE
FOSTER WHEELERSINGAPORESINGAPORE PARALLEL
TRAIN (SPT) EXXON MOBIL
CHEMICAL CO.CONTRACT
N° 1-14-00-2520/
A182 F53, A105N,
A350 LF2, A182
F304L, A182 F316L,
A182 F91, A182 F22
2009
UP TO 2"
VIAR SOCK
VIAR THREAD
FORGED FITTING
EXXON MOBIL,
SINGAPORE
GOVERNMENT,
SINGAPORE EDB
EXXON MOBILSINGAPORESINGAPORE PARALLEL
TRAIN REFINERY AND
CHEMICAL HUB PROJECT
SB/B167 UNS
N06600, SB/B462
UNS N08020, A182
F316/316L, A182
F304, A182 F22, A1
2009 UP TO 3"
UP TO 6"
2"
VIAR WELD
VIAR LAT
VIAR-NIP FLANGED
AKER SOLUTIONS/ SBM
OFFSHORE
BP / STATOILNORWAYSKARV & IDUN OFFSHORE
FIELD DEVELOPMENT
PROJECT - BP NORGE
A182 F53/ F55/ F51/
F316L
2009 12"SWIVEL RING FLANGEPETRONAS CARIGALI
SDN BHD
BLUEWATER
ENERGY SERVICES
B.V.
TURKMENISTANSPM & PLEM SYSTEM FOR
TURKMENISTAN BLOCK 1
GAS DEVELOPMENT
A105N, A694 F52
2009 4"X4"X4"
8"X8"X8" 8"X8"X6"
8"X8"X4"
SUB SEA TARGET TEE
LATERAL TEE
CUU LONG JOINT
OPERATING COMPANY
PTSC MECHANICAL &
CONSTRUCTION CO.
LTD. J.RAY
MCDERMOTT FAR
EAST INC.
VIETNAMSU TU FIELD
DEVELOPMENT SU TUN
DEN NORTHEAST EPCI
PROJECT
A105N
2009 UP TO 24"VIAR WELDSSEM (SAUDI
SERVICES FOR
ELECTROMECHANIC
WORKS CO. LTD.)
ALSTOMSAUDI ARABIASWCC - SHOAIBA PHASE 3
WATER TRANSMISSION
SYSTEMS PROJECT
A694 F52, A694 F65
2009 UP TO 2"VIAR WELD/VIAR SOCK
FORGED FITTING
SIDNEY WATER -
AUSTRALIA
BLUE WATERAUSTRALIASYDNEY DESALINATION
PLANT PROJECT -
BLUEWATER JOINT
VENTURE
A182 F53, A182 F60
REFERENCE LIST
YEAR PROJECT NAME ITEMS SUPPLIEDEND USER DIMENSIONSDESTINATION EPC CLIENT MATERIAL
2009 UP TO 2"FORGED FITTINGTAISHAN NUCLEAR
POWER JOINT
VENTURE
EDF - CNPDCCHINATAISHAN NUCLEAR POWER
STATION
Z2CN1712 (S2),
Z2CN1810 (S1),
TU42C (C1),
Z2CND1812 (S4)
2009 32"X26"
26"X22"
SUB-SEA BARREL PIPE
ECCENTRIC REDUCER
NECK PIPE
ENI SAIPEM -
INDONESIA
BP /ENI SAIPEM - JGCINDONESIATANGGUH GAS
PRODUCTION FACILITES
PROJECT ENI/ SAIPEM
A694 F65
2009 2"VIAR WELDDOLPHINTECHNIP ABU DHABIUAETAWEELAH TO FUJAIRAH
GAS PIPELINE PROJECT
A350 LF3
2009 UP TO 6"
UP TO 4"
VIAR WELD
FORGED FITTING
YEMEN LNG COMPANY
LTD.
TECHNIPREPUBLIC OF
YEMEN
TECHNIP YEMEN LNG
PROJECT
A105, A182 F304L,
A182 F316L
2009 UP TO 1"
16" X 16"
UP TO 12"
SINO 2011
FORGED FITTING
VIAR THREAD
TEE HEADER &
BRANCH
SPECIAL TEE
VIAR WELD
TRINIDAD GENERATION
UNLIMITED
MAN FERROSTAL
INDUSTRIAL
PROJECTS GMBH
TRINIDADTGU 720 MW TRINIDAD
COMBINED CYCLE POWER
PLANT PROJECT
A105N,
A182 F316L,
A182 F91
2009 UP TO 1.5"VIAR-WELD FLANGEDTOTAL E & P -
INDONESIE
TOTAL E & P -
INDONESIE
INDONESIATUNU FIELD
DEVELOPMENT PROJECT
TP13A/EPSC 1
A105N
2009 UP TO 8"SINO 2010
VIAR WELD
YARAKRUPPUHDETHE
NETHERLANDS
UREA SOLUTION PLANT
SLUISKIL 11-3119
A182 F11, A182
F304L/ F316L,
A105N
2009 8"VIAR WELDMINISTRY OF WATER
AND AGRICULTURE -
SAUDI ARABIA
TROUVAY CAUVIN
GULF B.S.C
SAUDI ARABIAWATER SUPPLY TO HAIL
VILLAGE PROJECT - SULAI -
RIYADH
A105N
2009 UP TO 2"
UP TO 8"
VIAR-NIP FLANGED
VIAR WELD
WOODSIDE-EOS-NORT
H WEST SHELF
VENTURE
J RAY MCDERMOTT -
HYUNDAI HEAVY
INDUSTRIES
AUSTRALIAWOODSIDE NORTH RANKIN
"B" PROJECT GAS
PLATFORMS - EEW
PROJECTS
A182 F51, A182 F53.
A790 UNS 31803
2009 UP TO 12"
UP TO 2"
VIAR WELD
VIAR SOCK
SPECIALLY DESIGNED
FORGED FITTING
NOVATEK PETROLEUM
RUSSIA (OJSC)
BECHTEL - ENKARUSSIAYAJVA POWER PLANT
PROJECT
A182 F22, A182 F9,
A182 F316L, A105N
2008 3/4"FITTING SPACERMEPI - NPCC -QATAR
PETROLEUM
CHIYODA TECHNIP
JOINT VENTURE
(CTJV)
QATAR9512P QATARGAS II
DEVELOPMENT PROJECT
OFFSHORE FACILITIES
B564 UNS N08825,
B564 UNS N06625
2008 UP TO 12".
UP TO 1"
VIAR WELD
VIAR SOCK
FITTING
EGAS (EGYPTIAN
NATURAL GAS
HOLDING CO.)
ABB - GASCOEGYPTASSUIT/ASWAN GAS
PIPELINE PROJECT &
DAHSHOUR COMPRESSION
STATION P.O. N°3231-610
A694 F60, A694 F52,
A105N
2008 1"VIAR SOCKBADR EL DIN
PERTOLEUM CO.
(BAPETCO) - SHELL
EGYPT
EGYPTIAN GENERAL
PETROLEUM (EGPC)
EGYPTBADR EL.DIN 19 AEB EARLY
PRODUCTION FACILITIES
PROJECT
A182 F55
2008 4"
4", 12", 14"
4"
SUB SEA SWIVEL RING
FLANGE
HANGER FLANGE
WN FLANGE
MISALIGNMENT
FLANGE
BLIND FLANGE
BRITISH GAS
EXPLORATION AND
PRODUCTION LTD.
WORLEYPARSONS -
CUEL LTD.
THAILANDBG HYDRA FEED PROJECT
SWP WELLHEAD
PLATFORM PROJECT N°
BGG0801V
A694 F60, A694 F65
2008 20"SUB SEA COMPACT
FLANGE
ENI AUSTRALIA J P
KENNY
ENI / SAIPEM
AUSTRALIA
AUSTRALIABLACKTIP DEVELOPMENT
PROJECT PIPELINE
SYSTEM DESIGN
A350 LF2, B564
UNS N06625
REFERENCE LIST
YEAR PROJECT NAME ITEMS SUPPLIEDEND USER DIMENSIONSDESTINATION EPC CLIENT MATERIAL
2008 -UP TO 24"
-18", 20", 22", 24"
-12"X 10", 12"X12",
16"X10",
16"X16"16"X12",
16"X16", 18"X12",
18"X16", 18"X18",
22"X18"
-12", 16", 18", 22"
-12"X16" 20"X18"
22"X18" 24"X22"
14"X12" 18"X16"
16"X12" 20"X16"
-16"
SUB SEA PIPE
SUB SEA QUICK
OPENING CLOSURE
SUB SEA BARRED TEE
SUB SEA SWIVEL RING
FLANGE
SUB SEA WN FLANGE
SUB SEA CONC. & ECC.
REDUCERS
SUB SEA BLIND
FLANGE
PTT EXPLORATION &
PRODUCTION (PTTEP)
THAI NIPPON STEEL
(TNS)
THAILANDBONGKOT FIELD
DEVELOPMENT - PHASE 3H
& 4A (PIG TRAP)
WELLHEAD PLATFORMS
FOR PROC
A694 F60 AND A694
F60 WITH
CLADDING
2008 UP TO 10"
UP TO 18"
UP TO 6"
UP TO 8"
SUB SEA SPECTABLE
BLIND FLANGE
SUB SEA VIAR ELB
SUB SEA CON. & ECC.
REDUCER
SUB SEA TEE
PTT EXPLORATION &
PRODUCTION (PTTEP)
THAI NIPPON STEELTHAILANDBONGKOT FIELD
DEVELOPMENT PROJECT -
PHASE 3H & 4A WELLHEAD
PLATFORMS FOR
PROCURE
A240 TP321, A240
TP316L, A240 UNS
S31803, SB/B402
UNS C70600, A516
GR.70, A105N
2008 18"x14", 16"x16",
18"x16", 28"x24",
32"x24"
WYE PIECECAIRO ELECTRICITY
PRODUCTION
COMPANY
CIMTAS
BORU-PGESCO
EGYPTCAIRO WEST POWER
PLANT PROJECT SIDI KRIR
& EL ATIF CIMTAS
BORU-TURKEY
A182 F91, A105
2008 38"x22", 38"x24"WYE SPECIAL PIECECOLBUNMAIRE ENGINEERING
- COLBUN
CHILECOLBUN CONTRATO
CTCB-011 PUERTO
CORONEL CENTRAL
TERMOELECTRICA A
CARBON - POWER
A182 F91
2008 UP TO 36"VIAR WELDDEVELOPMENT
CONSTRUCTION
PLANNING DEPT. DUBAI
GOVERNMENT (DCP)
THROUGH TRADING
COMPANY
DUBAIDCP - BUSINESS BAY
EXECUTIVE TOWERS
A105N
2008 UP TO 12"
UP TO 1"
VIAR WELD
VIAR THREAD
DEVELOPMENT
CONSTRUCTION
PLANNING DEPT. DUBAI
GOVERNMENT (DCP)
THROUGH TRADING
COMPANY
DUBAIDIFC - NORTH DUBAI
PROJECT DEVELOPMENT
A105N
2008 UP TO 3"TEE & REDUCERSEDFALSTOMFRANCEFLAMANVILLE NUCLEAR
POWER PLANT PROJECT
P280GH, P264GH
2008 UP TO 10"
UP TO 1.5"
VIAR WELD
VIAR-NIP FLANGED
OMAN OIL - OMANTHROUGH TRADING
COMPANY
SULTANATE OF
OMAN
HARMEL PROJECT
PDO-OMAN
A105N, SB/B564
UNS NO8825, A182
F316, A350 LF2
2008 37"x37"x26"LATERAL TEE 45°HUA YANG ELECTRIC
CO.
HITACHICHINAHUA YANG ELECTRIC
POWER PLANT
A234 WP91
2008 UP TO 4"VIAR WELDPERTAMINA-HESS
PT.TRIPATRA
TALISMANINDONESIAJAMBI MERANG
DEVELOPMENT OF GAS
PRODUCTION FACILITES
A182 F51, A182 F55
2008 0.75"
UP TO 1.5"
VIAR WELD-FLANGED
VIAR O'LETS
FORGED FITTING
AGIP KAZAKHSTAN
NORTH CASPIAN
OPERATING CO.
PETROFACREPUBLIC OF
KAZAKHSTAN
KASHAGAN FIELD
DEVELOPMENT,
EXPERIMENTAL PROGRAM
(CONTRACT 2004/2003)
SUPPLY OF
A182 F316L, A182
F51, CUNI 90/10,
B564 UNS N08825
2008 6", 10"
16" VR 130
UP TO 1.5"
VIAR WELD
VIAR LOCK
VIAR-NIP FLANGED
TALISMAN ENERGY
NORGE SA. FIELD
OFFSHORE NORWAY
SBM OFFSHORE -
GUSTO
ENGINEERING -
TECHNIP
NORWAYMOPUSTOR - YME FIELD
DEVELOPMENT PROJECT
A694 F65, AISI 4140
2008 4"
14"
6"X4"
VIAR WELD
90° ELB
ECC. REDUCER
PTT EXPLORATION &
PRODUCTION (PTTEP)
THAI NIPPON STEELTHAILANDNORTHERN ARTHIT
DEVELOPMENT PROJECT
AWP3N
A105N, A350 LF2,
A182 F51, A420
WPL6, A333 GR6
2008 UP TO 6"
UP TO 36"
UP TO 12"
1.5"
16"
BLIND FLANGE
WN FLANGE
SPECTABLE BLIND
FLANGE
SW FLANGE
PADDLE BLIND &
SPACER
MEP TECHNIP ABU
DHABI GAS
LIQUEFACTION CO. LTD.
(ADGAS) - ABU DHABI
WORLEY PARSONSABU DHABIOFFSHORE ASSOCIATED
GASES PROJECT
PACKAGE1 ADGAS DOC
N.AG-100-A4L-4-0412
ADGAS C
A105N, A350 LF2,
A516/G60, A515/G70
REFERENCE LIST
YEAR PROJECT NAME ITEMS SUPPLIEDEND USER DIMENSIONSDESTINATION EPC CLIENT MATERIAL
2008 UP TO 2"
UP TO 1,5"
UP TO 6"
FORGED FITTING
VIAR NIP
VIAR WELD
SHELL PEARLLINDE ENGINEERING
- NOOTER ERIKSEN
QATARPEARL LINDE GTL
PROJECT QATAR PROJECT
DOC N° T-13.376.797
A182 F304L, A105N,
A182 F316
2008 UP TO 10"
UP TO 12"
VIAR WELD
VIAR -SWEEP INLETS
TOTAL E & P -
INDONESIE PT.
GUNANUSA UTAMA
FABRICATORS PT.
SINGGAR MULIA
PT. GUNANUSA
UTAMA
FABRICATORS PT.
SINGGAR MULIA
INDONESIAPECIKO FIELD
DEVELOPMENT PROJECT
PHASE 6 LP COMPRESSION
PCK.6 EPSC.1
A105N, A234 WPB,
A350 LF2, A182
F321
2008 UP TO 12"
UP TO 8"
UP TO 1.5"
VIAR WELD
VIAR SWEEP-INLETS
VIAR-NIP FLANGED
HUNT OIL COMPANY
PERU LNG
CHICAGO BRIDGE
AND IRON CO.
PERUPERU LNG PLANT
PROJECT
A105N, A350 LF2,
A182 F304L
2008 8"
6” (6VR46) , 8”
(8VR72), 12”
(12M102)
UP TO 13"
3"
UP TO 1.5"
UP TO 2"
PIGGABLE WYE PIECE
WN FLANGE
VIAR LOCK
SWIVEL RING FLANGE
VIAR ELB-FLANGED
VIAR THREAD
VIAR WELD
PETROBRASABB LUMMUSBRAZILPETROBRAS - FPSO
CIUDADE DE SAO MATEUS
OIL AND GAS FIELD
DEVELOPMENT PROJECT
384
A105N, A694 F65,
A694 F52
2008 UP TO 1"FORGED FITTINGARAMCO LTA PROJECTARAMCO/ J. RAY
MCDERMOTT MIDDLE
EAST INC.
SAUDI ARABIAPROJECT D5732 ARAMCO
LTA PROJECT
B564 UNS N08825
2008 UP TO 1.5"
24"
UP TO 1.5"
VIAR-NIP FLANGED
VIAR WELD
VIAR NIP-FLANGED
SHELL EASTERN
PETROLEUM PTE LTD.
SHELL EASTERN
PETROLEUM
COMPANY
SINGAPOREPROJECT HOUDINI MEG
(SHELL)
A105N, A182 F316L,
A182 F9, API 5LB,
A234 WP9, A182
F317L, API 5LBHD
2008 TO DESIGNFORGED FITTING, VIAR
O'LETS
QATAR SHELL GTL LTD.CHIYODA - CME
(JAPAN)
QATARQATAR SHELL PEARL GTL
PROJECT
A105N, A350 LF2,
A182 F316L, B564
UNS N06625
2008 UP TO 10"
UP TO 1.5"
UP TO 24"
VIAR WELD
VIAR SOCK
VIAR LAT
RELIANCE - JAMNAGAR
GUJARAT INDIA
BECHTEL FRANCE
S.A.S - RELIANCE
INDIARELIANCE EXPORT
REFINERY PROJECT (JERP)
B564 UNS N06625,
A105, CUNI 90/10,
B165 UNS S04400,
A350 LF2, B729
UNS N08020, A
2008 UP TO 4"
UP TO 16"
UP TO 2"
BLIND FLANGE
WN FLANGE
SPECTACLE BLIND
FLANGE
ADMA APCO - ABU
DHABI
GOGASABU DHABIRELIEF HEADER DAS
ISLAND
(CAS/PROC/08/236/SJ)
A105N LF2, A182
F316L
2008 UP TO 1.5"
UP TO 4"
VIAR-NIP FLANGED
VIAR WELD
PETROLEUM
DEVELOPMENT OMAN
TECNICAS REUNIDAS
OMAN
SULTANATE OF
OMAN
SAIH RAWL DEPLETION
COMPRESSION PROJECT
A105, A350 LF2,
A182 F316
2008 8", 20"SUB SEA PIGGABLE
WYES
SUB SEA TEST RING
MURPHY SARAWAK OIL
CO. LTD. - PETRONAS
CARIGALI SDN. BHD.
MALAYSIA
PETRONASMALAYSIASARAWAK GAS
DEVELOPMENT PROJECT
A350 LF6 CL.1
2008 UP TO 24"VIAR LATSAUDI KAYAN
PETROCHEMICAL CO.
KELLOGG BROWN
AND ROOT
SAUDI ARABIASAUDI KAYAN PROJECT A105N, A350 LF2,
A182 F304L
2008 UP TO 3"
UP TO 10"
UP TO 2"
VIAR WELD
SADDLE BOSSES
FORGED FITTING
SINGAPORE REFINING
CO. PTE. LTD.
JGC CORPORATION
JAPAN
SINGAPORESRC UPGRADE DIESEL
CLEAN FUELS PROJECT
JGC (JAPAN)
A105N, A182 F5,
A182 F321,
A182 F316L,
A182 F11
2008 UP TO 6"VIAR WELDSYDNEY WATER -
AUSTRALIA
BLUE WATERAUSTRALIASYDNEY DESALINATION
PLANT PROJECT -
BLUEWATER JOINT
VENTURE
A182 F53, A182 F60
2008 UP TO 3"
UP TO 1.5"
3/4"
UP TO 3"
VIAR WELD
VIAR NIP
VIAR -NIP FLANGED
VIAR-WELD FLANGED
FORGED FITTING
HESS (INDONESIA -
PANGKAH) LTD.
PT BAKRIE
CONSTRUCTION
INDONESIAUJUNG PANGKAH
DEVELOPMENT OFFSHORE
PHASE II (WHP-B-EPCC)
A105N, A182 F53,
A350 LF2, A333 GR6
2008 32"
UP TO 2"
32"
6", 10"
COMPACT FLANGE
LWN FLANGE
WN FLANGE
BLIND FLANGE
VIAR WELD-FLANGED
MELLITA OILENILYBIAWATER INJECTION
PROJECT EL FEEL PLANT
NC-174
A350 LF2
REFERENCE LIST
YEAR PROJECT NAME ITEMS SUPPLIEDEND USER DIMENSIONSDESTINATION EPC CLIENT MATERIAL
2007 UP TO 20"VIAR WELDKTA REFINERYWILSONSHANGHAI1000KTA REFINERY &
1200KTA ETHYLENE
EXPANSION COMPLEX
A182 F321H, A182
F91
2007 2"VIAR NIP-FLANGED
WN FLANGE
ABU DHABI GAS LTDEASTERN BECTHELU.A.EADCO OGD III
UPSTREAM-AT BAB
PROJECT
A694 F60, A694 F65
2007 UP TO 2"VIAR-NIP FLANGEDADMA-OPCO - ABU
DHABI
NPCCABU DHABIADMA USGIF/USSC
PROJECT-NPCC UAE
A694 F60
2007 UP TO 2"VIAR-NIP FLANGEDADMA-OPCO - ABU
DHABI
NPCCABU DHABIADMA-OPCO CSP-GGII ABU
DHABI/NPCC
A105, A350 LF2,
A694 F60, A182 F44
2007 16"ANCHOR FLANGE
TEST RING FOR
ANCHOR FLANGE
TOTAL UPSTREAM
NIGERIA LTD.
TECHNIP- HYUNDAI
HEAVY INDUSTRIES -
TOTAL
NIGERIAAKPO FPSO FIELD
DEVELOPMENT PROJECT
NIGERIA-OML 1030
A694 F60
2007 UP TO 16"
3"
BW FITTING
VIAR WELD
PTTEPTHAI NIPPON STEEL
(TNS)
THAILANDARTHIT WELLHEAD
PLATFORM PROJECT
PHASE 1B
A182 F51
2007 2"
UP TO 18"
8" X 16", 20" X 16"
SUB SEA LWN FLANGE
SUB SEA WN FLANGE
SUB SEA CONC. & ECC.
REDUCERS
PTTEPTHAI NIPPON STEEL
(TNS)
THAILANDARTHIT WELLHEAD
PLATFORM PROJECT
PHASE 1B (PIG TRAP)
A694 F52
2007 UP TO 6"
12"
UP TO 20"
UP TO 16"
SUB SEA SPECTABLE
BLIND FLANGE
SUB SEA BLIND
FLANGE
SUB SEA SW FLANGE
SUB SEA WN FLANGE
PTTEP, TOTAL E & PTHAI NIPPON STEEL
(TNS)
THAILANDBONGKOT FIELD 3G A182 F321, A182
F316L
2007 UP TO 20"
16"
UP TO 18"
14"X12", 16"X12",
18"X16", 20"X16"
12"X12", 16"X10",
16"X12", 16"X16"
UP TO 16"
UP TO 20"
SUB SEA PIPE
SUB SEA TEST RING
SUB SEA WN FLANGE
SUB SEA C&E
REDUCERS
SUB SEA BARRED TEE
SUB SEA SWIVEL RING
FLANGE
SUB SEA QOC HUB &
DOOR
PTTEP, TOTAL E & PTHAI NIPPON STEEL
(TNS)
THAILANDBONGKOT FIELD 3G (PIG
TRAP)
A105, A350 LF2,
A694 F60, A182
F316L, CLADDING
IN SS316L
2007 UP TO 10"
UP TO 2"
VIAR WELD
SWAGE NIPPLE
BP SPAINBPSPAINBP PARADA SPAIN OIL
PROJECT
A105N, A350 LF2,
A106B, A333 GR6,
A335 P5, A694 F52,
A694 F65, A182 F5,
A182 F9
2007 UP TO 10.75"
UP TO 10.75"
SUB SEA BLIND
FLANGE
WN FLANGE
SWIVEL RING FLANGE
HOAN VU JOC.EDG CONSULTING
ENGINEERING
VIETNAMCA NGU VANG FIELD
DEVELOPMENT PROJECT
FOR C PP3 PROJECT CUU
BASIN LONG JOINT OPE
A684 F65