Post on 12-Jan-2023
1
MM – ConfigurationMaster Data and PR
Objective
To understand
MM Module data flowMM Module Master DataRequisitionRFQ QuotationRelease Strategy
MM Module Data flow
Purchaseorder
MMMaterials
mgmt6
5
4
2
7
Order follow-up
Order processingVendor selection3
Sourcedetermination
1 Determine Requirements
Goods receipt andinventory management
PlanRqmts.
InvoicePurchaseorder
Invoice verification
3
Data flow ..contd..1.MRP run triggers the requirements
Purchase requisition is released 2. If quota is used, source is identified 3. vendor is selected4. Prepare Purchase Order5. Follow up with vendor for supply6. Receive goods7. Receive Invoice and pay vendor
4
Data in SAPWe have seen the data flow in MM, to perform those activities, certain data are required.
Let’s discuss about the data before we go to the MM specific master data.
6
Master DataMaster data is the backbone for each transaction.
Without master data transactions can not be performed.
E.g. Material masterVendor masterPurchasing info recordSource listQuota arrangement
7
Transaction dataTransaction data are created when performing a transaction.
Transaction data are created with the input from master data.
e.g. Purchase requisitionPurchase orderGoods receipt Invoice verification
8
MM Specific Master dataFollowing are the MM module specific master data.
Material Master Vendor MasterSource ListQuota arrangementPurchasing Info recordPurchasing group
9
Material MasterMaterial master contains entire information about the material related all department of an organization.
Purchasing related information are stored in a purchasing view.
10
Material master - PurchasingPurchasing view of material master specifies
Person responsible to procure Base unit of measurePlant specific material statusGR processing timeUse of quota arrangementUse of source listBatch Management
11
Vendor MasterVendor master contains all the information required to do business with a vendor.
Name and addressBank detailsContact personPayment terms
Vendor Master RecordGeneral dataAccount numberDescriptionAddress
DM
Bus. volumes1994
Bus. volumes1995
Purchasing data
Purchase order currencyInco terms
Accounting dataControl accountTerms of paymentBank details
Transaction figures
Roles of a Vendor
Purchase order
Goods receipt
Payment
Vendor
Purch.Bank
InvoicePurc. order
?=
Invoice verification
Material
Invoice
Invoicing Party
PayeeOrder Recipient
Goods Supplier
14
Source ListList of available sources of supply for a material and plant combination.
It facilitates the Determination of source.Automatic assignment of source to the purchase requisition
Source list contains validity period for each vendor.
Source ListManual
maintenance
Maintenance from outlineagreement
Maintenancefrom purchasinginfo record
Automatic generation
Default source of supplyin requisition via sourcedeterminationCheck in purchase order+ requisition for admissibility
16
Source determinationFollowing is the order of priority to search the source.1. Quota arrangement 2. Source List3. Purchasing Info record / outline agreement.
How to Determine the Source?11
22
33
44
Agreement itemFixed vendor
Fixed vendor
Quotaarrangement
?Vendor
60%60% 40%40%
Source list
Source list?
Outlineagreement? Purchase
requisition
Purchase requisition
Purchaserequisition
Info record
Agreement item
piece %
Condition$
18
Quota arrangementQuota arrangement helps to automatically identify the vendor and allocate the quantities to the vendor.
It containsVendor Quota %Min / Maximum lot size Validity period of quota
19
Quota arrangement -calculation
Vendor will be determined on the basis of lowest rating result of the following formula
Rating = Base qty +Quota – allocated qty--------------------------------------------
Quota
20
Base quantity & PrerequisiteQuota base quantity is to regulate the quota arrangement without changing the quota.
Prerequisite:-
Quota usage must be maintained in the material master purchasing view
21
Purchase info recordIt is created for the combination of material, vendor and purchase organization.
Purchasing Info Record Data
General data
Vendor dataOrigin dataOrder unit
Texts
Prices and conditions
Gross priceDiscountFreight
Control data
Delivery timeMinimum quantity
Tolerances
Price historyOrdering statistics
Change history
23
Purchasing groupPurchasing group is responsible for specific purchasing activities.It represents buyerIt is used for reporting
24
Purchase RequisitionPR is the request for Material and services. It is the first trigger to the buyer to arrange for procurement.
It is generated automatically or manually.Item category and account assignment are important in PR
25
Item categoryItem category controls
Requirement of material numberAccount assignmentWhether to place in stock or notRequirement of GR / IR
ItemItem CategoryCategory
- Cost centre- Project- Sales order- Asset
Optional
Mandatory• Standard item
• Consignment item
• Text
• Third-party
Items / item categorySingle/multipleaccount assignment
Stock material
Consumable material
Account assignmentAccount assignmentAccount assignment will directly debit the cost of procurement to those object.
E.g. If the account assignment is F to indicate production order, cost of procurement will be debited to the production order.
Account categories
A
F
K
P
X
U
C
Asset
Sales order
Production order
Cost centre
Project
All auxiliary account assignments
Unknown account assignment
Account AssignmentConsumable material
Enter accountcategory
Manual accountassignment
User mustenter data
Consumption account
Asset account
Without materialmaster record
With materialmaster record
With accountcategory
Accountassignment
with materialmaster record
Automatic accountassignmentData frommaterial master record
Stock material
Stock account
How to Create a Purchase Requisition
Dep. 1 Dep. 2
Purchaserequisition
• MRP - reorder level• Networks- forecasting• Plant maintenance orders
MANUALLYINDIRECTLY
PurchaseOrderRFQ Release
Order
IdentifySupplier
(Automatically)
ReleaseProcedure
Allocate andProcess
Requisition
PlannedOrder
MRPPurchase
RequisitionManual
Creation
Processing PR
32
RFQ (Request for quotation)Quotation is used in purchasing to compare different vendors before placing an order.
It contains entire information similar to PO.
Structure of an RFQ
Header Messages
VendorHeader QuotationTexts deadlineItems
Request forquotation
(RFQ)
Statistics
Changes
Texts
Delivery schedule
1.2 10.10 10 pcs2.2 11.00 50 pcs
Processing QuotationsEnter price and pricing conditions
Vendor BQuotation forRFQ 2Item 10Gross price:200/tSurcharge: 20%
Vendor C, B- Rejection-
Thank you for your offer. Unfortunately,we cannot place anorder at this time .....
Vendor AQuotation forRFQ 1Item 10Gross price:200/tDiscount: $40
Vendor CQuotation forRFQ 3Item 10Gross price:200/tFixed costs: $50
Vendor A- Order -
Mat. Qty Price
Steel 2t 160/t
Create info record or reject quotation
Steel 2 t
PriceQuotation 1 Quotation 2 Quotation 3 Mean value
quotation
Compare quotations using price comparison list160/t 220/t 250/t 263/t
35
Release StrategyRelease strategy helps to control further processing.
Based on conditions, different person or department can be authorized to release in sequence
It can be applied for PR, RFQ and for PO.
Item level release can be applied for PR
It can be with or without classification
Release ConditionsRelease Conditions
ValueValueMaterial GroupMaterial GroupPlantPlant
Does a Strategy Apply?
Release IndicatorRelease Indicator
Released/Blocked for OrderingReleased/Blocked for OrderingReleased/Blocked for RFQReleased/Blocked for RFQFixed for MRPFixed for MRP
What can the Requisition be Released to?
Release StrategyRelease Strategy
Who is Authorised to Release?Who is Authorised to Release?In what Order must the In what Order must the Releasing Occur?Releasing Occur?What is the Release Indicator?What is the Release Indicator?
Who can do what?
Release CodeRelease Code
Two digit code associated withTwo digit code associated witha user IDa user ID
Who is Authorised to release?
Release Procedure
Release Conditions
ValueMaterial GroupAccount Assgt. CategoryPlant
Does a Strategy Apply?
ReleaseStrategy
Release Procedure W/out Classification
ReleaseStrategy
Does a Strategy Apply?
Characteristics in a Class(Classification System)
Any field in the Document
Release ConditionsRelease Group
Requisitions
Other Purchasing Documents?
Release Procedure With Classification
Purchasing
BlockedPurchase
Requisition
IndividualRequisition
Release
SingleRelease
Collective (Multiple)Requisition Release
Y N
Releasing Requisitions