#GH190398 Saankhya Darshan, Pune
IGBC Green Homes Certification Level: PLATINUM
Date: 27 August 2020
83
0
IGBC Green Homes Version 2.0 Certification Final ReviewMulti-dwelling Residential Units
The applicant has provided the required documentation which supports achievement of the mandatory/ credit requirement Expected). These
credits will be finally awarded during the Final Review.
Audit: The mandatory requirement/ credits which are marked as ‘Audit’ would be examined during the site visit of the IGBC Assessors.
The applicant has applied for a point in a particular mandatory requirement/ credit, but has misinterpreted the credit’s intent or cannot
substantiate meeting the mandatory requirement/ credit requirements. The project has not demonstrated achievement of these mandatory
requirement/ credits.
AWARDED
Environmental The report is organised into five environmental categories as defined by IGBC Categories which include – Site Selection and Planning, Water Efficiency,
Energy Efficiency, Materials & Resources and Indoor Environmental Quality. The category of Innovation and Design Process is also included.
IGBC Mandatory: Green Homes should meet certain mandatory requirements which are non-negotiable. Requirement: These mandatory requirements should be addressed
immediately by the team.
IGBC Credits: The environmental categories are subdivided into mandatory requirement/ credits, which are based on desired performance intent within each category. An
assessment of whether the credit is anticipated, pending, or denied is made and a narrative describes the basis for the assessment.
DENIED
Preliminary Rating: Not Certified
Scores: Certified: 50-59 Silver: 60-69 Gold: 70-79 Platinum: 80-100
Created on behalf of IGBC
Copyright IGBC Green Homes Rating 2007 Page 1 of 14
14 0 19
Y SSP Mandatory
Requirement 1
Local Building Regulations Y Final Review:
The project has submitted translated copy of commencement certificate, drainage, garden and
fire NOC. This meets the mandatory requirement.
Preliminary review:
The submitted IGBC Green Homes template and narrative submitted states that the project has
complied with all required statutory and regulatory codes of Local Government Authority (Pune
Municipal Corporation). The submittal includes sanctioned plan, Completion and commencement
certificate along with drainage, garden and fire NOC.
However, additional details are required to meet the credit intent.
Technical Advice:
Kindly provide translated copy of commencement certificate and NOC.
Y SSP Mandatory
Requirement 2
Soil Erosion Control Y Final Review:
The submitted narrative states that the project is on an existing site and has incorporated erosion
and sedimentation control measures that conform to the best management practices highlighted
in the National Building Code (NBC) of India.
The pre construction measures include protection of existing tress, excavation during dry season
and during construction measures include site barricading, provision of temporary drainage
channel, proper and storage of materials and post-construction measures includes plan of ESC
measures, Landscaping and RWH. The project team has submitted the narrative describing an
erosion and sedimentation control (ESC) measures implemented on-site at preconstruction,
during construction and post occupancy stage. The submittal also includes site management
plan, landscape plan and storm water drainage plan.
This meets the mandatory requirement.
Preliminary Review:
The documents for this credit is missing from the submission.
Technical Advice:
Kindly provide the documents required to meet the mandatory requirement.
Site Selection & Planning Points Available:
Aw
ard
ed
Den
ied
Created on behalf of IGBC
Copyright IGBC Green Homes Rating 2007 Page 2 of 14
Site Selection & Planning Points Available:
Aw
ard
ed
Den
ied
2 SSP Credit 1 Basic House-hold Amenities 2 Preliminary Review:
The submitted IGBC Green Homes Version 2 Template and narrative states that the project has
access to at least seven basic amenities which includes School, Hospital, Super market,
Restaurant, Gym, Jogging track and Pharmacy within a walking distance of 1 km from the
building entrance. The project has also provided tot-lots area, one common toilet for 10 dwelling
units and seating provision in common area.
Supporting documents include aerial plan highlighting the amenities, site plan showing the
common toilet and seating area, photographs of the amenities, seating facility, common toilets &
tot-lots provided on the site.
This meets the credit requirement.
2 SSP Site Credit 2 Natural Topography or Vegetation:
15 %, 20%
4 Preliminary Review:
The submitted IGBC Green Homes Version 2 template and narrative states that vegetation is
provided for at least 15% of the site area. The calculation submitted indicates that the total site
area is 689 sq. m and the area with vegetation on ground is 105 sq. m accounting to 15.2% of
site area. The submittal includes the calculations, landscape plan and on-site photographs.
This meets the credit requirement.
1 SSP Credit 3 Heat Island Effect, Non-Roof: 50%,
75%
2 Preliminary Review:
The submitted IGBC Green Homes Version 2 template and narrative states that more than 50%
of the exposed non-roof impervious area is covered with light coloured pavers. The calculation
submitted indicates that the total net impervious area over non-roof is 193 sq. m and the area
covered with light coloured pavers is 116.9 sq. m. The submittal includes the calculations, non-
roof plan and on-site photographs.
This meets the credit requirement.
4 SSP Credit 4 Heat Island Effect, Roof: 50%, 75 % 4 Preliminary Review:
The submitted IGBC Green Homes Version 2 Template and narrative indicates that more than
50% of the roof area is covered with reflective paint/vegetation. The calculation submitted
indicates that the exposed roof areas is 310 sq. m and the area covered with reflective coating is
242 Sq. m. accounting for 78%. The supporting documents include roof plan highlighting service
area and exposed roof, manufacturer test report, on-site photographs covered with high SRI
paint.
This meets the credit requirement.
Created on behalf of IGBC
Copyright IGBC Green Homes Rating 2007 Page 3 of 14
Site Selection & Planning Points Available:
Aw
ard
ed
Den
ied
1 SSP Credit 5 Parking Facilities for Visitors: 10% 1 Final Review:
The project team has provided required parking spaces. This has been verified during the IGBC
virtual site audit. This meets the credit requirement.
Preliminary Review:
The submitted IGBC Green Homes Version 2 Template and narrative submitted states that the
project has provided adequate visitor parking on the site as per local bye laws. The submitted
calculation indicates that the number of residential car parking spaces provided on site is 20 Nos
for 10 dwelling units and the number of car parking spaces for visitors is 1 Nos (5% of the
residential parking). Supporting documents include parking plans, copy of local bye-law
highlighting the car parking requirement on site and car parking calculation sheet.
However, additional details are required to meet the credit intent.
Technical Advice:
1. The submitted parking plan and calculations does not include 2 wheeler and bicycle parking
spaces, as required by the local bye laws. Kindly provide revised parking plan and photographs of
all parking spaces.
2. Kindly submit On-site photographs showing visitors parking provided with permanent signage.
1 SSP Credit 6 Electric Charging Facility for
Vehicles: 5 %
1 Preliminary Review:
The submitted IGBC Green Homes Version 2 Template and narrative states that the project has
provided adequate electric charging facilities for car parking spaces for more than 5% of the total
car parking capacity. The total number of car spaces provided is 20 and 10 Nos of electric
charging facilities are provided on site. Supporting documents include On-site photographs of
charging facility.
This meets the credit requirement.
SSP Credit 7 Design for Differently Abled 2 Preliminary Review:
Not Pursuing
2 SSP Credit 8 Basic Facilities for Construction
Workforce
2 Preliminary Review:
The IGBC Green Homes Version 2 Template and narrative submitted states that the project has
provided basic facilities for construction workforce. The facilities include housing facility, drinking
water facilities, first aid, sanitation facilities, personal production equipment, dust suppression
measures, safety equipment, etc. The submittal also includes the on-site photographs of facilities
provided for the workforce.
This meets the credit requirement.
Not
Pursuing
Created on behalf of IGBC
Copyright IGBC Green Homes Rating 2007 Page 4 of 14
Site Selection & Planning Points Available:
Aw
ard
ed
Den
ied
1 SSP Credit 9 Green Home Guidelines, Design &
Post Occupancy
1 Preliminary Review:
The IGBC Green Homes Version 2 Template and narrative submitted states that the project has
provided descriptive guidelines to the tenants. The submittal includes the draft copy of tenant
guidelines for the project.
This meets the credit requirement.
14 0 18
Y WE Mandatory
Requirement 1
Rainwater Harvesting, Roof & Non-
roof, 25 %
Preliminary Review:
The submitted IGBC Green Homes Version 2 template and narrative states that the project has
designed rainwater harvesting systems to capture 100% of runoff from the roof and non roof
areas. The submitted calculation indicates that the rain water run-off from the roof and non roof
areas is 13 cum (considering average normal rainfall of 23 mm per day) and the capacity of the
recharge capacity is 19 cum. The supporting documents also include the IMD rainfall calculation,
RWH plan showing locations of rainwater harvesting pit with bore well and drain line along with
on-site photographs of the harvesting pit.
This meets the mandatory and credit requirement.
Y WE Mandatory
Requirement 2
Water Efficient Plumbing Fixtures Y Preliminary Review:
The submitted IGBC Green Homes Version 2 Template and calculations submitted in the
narrative states that the project has used efficient plumbing fixtures (i.e. Flush and flow) which
meets the baseline criteria and a saving of at least by 35%. The submitted narrative states that
the project has installed low flush fixtures from having flow rates of 6/3 LPF and low flow fixtures
of 3 LPM for kitchen sink faucet, health faucet and 6 LPM for shower showing a saving of 39.6%
over baseline. The supporting documents include calculations, letter/brochure from manufacture
confirming the flow rates and on site photographs of installed fixtures.
This meets the mandatory and credit requirement.
4 WE Credit 1 Landscape Design:
Turf < 20 %, 40%
Drought Tolerant / Native species
>20%, 40%
4 Preliminary Review:
The submitted IGBC Green Homes Version 2 Template and narrative declares that the project
landscape is designed with drought tolerant species to conserve water. The project team has
submitted the calculations demonstrating 15.18% area with turf (11.2 sq. m) and over 88% with
drought tolerant species (93.4 sq. m) of the total landscape area (104.6 sq. m). The supporting
documents include the landscape plan, list of species and photographs of the landscape area.
This meets the credit requirement.
Water Efficiency Points Available:
Created on behalf of IGBC
Copyright IGBC Green Homes Rating 2007 Page 5 of 14
Site Selection & Planning Points Available:
Aw
ard
ed
Den
ied
1 WE Credit 2 Management of Irrigation Systems 1 Preliminary Review:
The submitted IGBC Green Homes Version 2 Template and narrative states that the project has
incorporated certain measures for an efficient irrigation system. These measures include
installation of central shut-off valve, timer controlled based drip irrigation system and separation
bedding area into independent zones based on watering needs. The submittal includes the
irrigation layout, sprinkler system purchase order and the on-site photographs of the segregation
into zones, installed irrigation system and central shut off value.
This meets the credit requirement.
4 WE Credit 3 Rainwater Harvesting, Roof & Non-
roof: 50%, 75 %
4 Preliminary Review:
Please refer to Preliminary review comments stated under WE Mandatory Requirement 1.
4 WE Credit 4 Water Efficient Plumbing Fixtures:
25 %, 35 %
4 Preliminary Review:
Please refer to Preliminary review comments stated under WE Mandatory Requirement 2
WE Credit 5 Waste Water Treatment and
Reuse: 50 %, 95 %
4 Preliminary Review:
Not Pursuing
1 WE Credit 6 Water Metering 1 Preliminary Review:
The submitted IGBC Green Homes Version 2 Template and narrative submitted states that water
meters are installed for landscape water consumption, car wash and solar hot water
consumption. The supporting documents include schematic line drawing and onsite photographs
of the water meters.
This meets the credit requirement.
22 0 25
Y EE Mandatory
Requirement 1
CFC Free Equipment Y Preliminary Review:
The IGBC Green Homes Version 2 Template and narrative submitted states that there are no
common ACs installed in the project and ACs in individual house in not under developer's scope.
The developer has provided occupant guidelines for installation of CFC free AC system.
Supporting documents include narrative and copy of occupants guidelines.
This meets the credit requirement.
Y EE Mandatory
Requirement 2
Minimum Energy Performance Y Preliminary Review:
Please refer to Preliminary review comments stated under EE Credit 1.
Technical Advice:
Please refer to Technical advice stated under EE Credit 1.
Not
Pursuing
Energy Efficiency Points Available:
Created on behalf of IGBC
Copyright IGBC Green Homes Rating 2007 Page 6 of 14
Site Selection & Planning Points Available:
Aw
ard
ed
Den
ied
9 EE Credit 1 Enhanced Energy Performance: 2
%, 4 %, 6 %, 8 %, 10%, 12 %, 14 %,
16 %, 18 %, 20%
10 Preliminary Review:
Prescriptive Based Approach
The submitted IGBC Green Homes Version 2 Template and narrative states that the project has
chosen Option 1 - Prescriptive Approach to meet the minimum and enhanced energy
performance criteria. The project is located in Warm and Humid climatic zone. The following
energy conservation measures (ECMs) are implemented in the project:
Building Envelope:
1. Wall: 150mm AAC blocks with U value of 0.959 W/m2-K against baseline of 1.8 W/m2-K ( 2
point awarded)
2. Roof: 230mm RCC Slab, 100mm brickbat coba and 50 mm insulation with U value of 0.5 W/m2-
K against baseline of 0.5 W/m2-K ( 2 point awarded)
3. Single glazing unit with 5.7 W/m2-K ( Meets mandatory requirement) 4. SHGC of 0.31 for
WWR of 16.5% against baseline of 0.38 ( 2 point awarded)
Lighting:
1. Efficient lighting fixtures in common area and exterior lighting with 50% reduction in LPD over
baseline ( 2 points awarded)
2. Timer based lighting control for Common area ( 1 point awarded)
The submittal includes wall, roof assembly details, letter from manufacture confirming glass
details, brochure of insulation material, WWR and SHGC calculation, LPD calculations along with
photographs of insulated roof during installation and timer control based lighting system.
This meets the mandatory and credit requirement.
6 EE Credit 2 On-site Renewable Energy: 50 % -
100% of the lighting load
6 Final Review:
The project has installed solar panels onsite. This has been verified during the virtual site audit.
This meets the credit requirement.
Preliminary Review:
The submitted IGBC Green Homes Version 2 Template and narrative states that the project has
installed renewable energy system (Solar photovoltaic panels). The narrative submitted indicates
the total common area lighting load of the project is 1647.8 kWh/year. The project has installed
solar panels with a capacity of 3KWp to generate 4700kWh/year. This accounts for 100% of the
total common area lighting load. The supporting documents include the common area lighting
calculation and purchase order of solar panels.
However, additional details are required to meet the credit intent.
Technical Advice:
Kindly submit the purchase invoice of solar panels.
Created on behalf of IGBC
Copyright IGBC Green Homes Rating 2007 Page 7 of 14
Site Selection & Planning Points Available:
Aw
ard
ed
Den
ied
4 EE Credit 3 Solar Water Heating System: 25 %,
50%
4 Final Review:
The project team has provided details of solar hot water system. Installation of solar hot water
system has been verified during the virtual site audit. This meets the credit requirement.
Preliminary Review:
The submitted IGBC Green Homes Version 2 Template and narrative states that the project has
installed solar water heating system. The narrative submitted indicates the total hot water
requirement in the project is 1060 litres/day. The project has installed panels with a capacity of
1625 litres/day accounting for 100% of the hot water requirement. The supporting documents
include hot water requirement calculation, purchase order of solar hot water system and on site
photographs of the system.
However, additional details are required to meet the credit intent.
Technical Advice:
Kindly submit the purchase invoice and on-site photographs of solar hot water system.
2 EE Credit 4 Energy Saving Measures in
Appliances & Other Equipment
2 Preliminary Review:
The submitted IGBC Green Homes Version 2 Template and narrative states that the project has
adopted energy saving measures in equipment and appliances installed in the project. The
measures include lift with group control and BEE 5 star pumps & motor. The submittal includes
the technical data sheet of lift and pump along with purchase order and onsite photograph of
pump.
This meets the credit requirements.
EE Credit 5 Distributed Power Generation 2 Preliminary Review:
Not Pursuing
1 EE Credit 6 Energy Metering 1 Preliminary Review:
The submitted IGBC Green Homes Version 2 Template and narrative states that project has
installed energy meters to monitor the energy usage. The project has installed energy meter for
common lighting, landscaping and water pumping. The supporting documents include electrical
SLD and on-site photographs of the installed energy meters.
This meets the credit requirement.
Not
Pursuing
Created on behalf of IGBC
Copyright IGBC Green Homes Rating 2007 Page 8 of 14
Site Selection & Planning Points Available:
Aw
ard
ed
Den
ied
18 0 18
Y MR Mandatory
Requirement 1
Separation of House-hold Waste Preliminary Review:
The submitted IGBC Green Homes Version 2 Template and narrative states that separate bins
are provided in the dwelling unit and a common facility is provided in the project to collect and
segregate dry waste (paper, plastic, metals and glass etc.) and wet waste (organic). The
submittal includes floor plan with separate bins at dwelling level and site plan indicating the
location of the waste collection facilities in the common facility along with onsite photographs of
common bins.
This meets the credit requirement.
4 MR Credit 1 Organic Waste Management, Post
Occupancy: 50%, 95 %
4 Preliminary Review:
The submitted IGBC Green Homes Version 2 Template and narrative states that Organic waste
management system is installed on site to treat 100% of organic waste generated on site. The
calculations submitted indicate that the estimated organic waste generated in the project is
13.25Kg/day and the capacity of the vermicomposter drum of is 15 Kg/day. The submittal
includes an overall site plan showing installed location of the OWC on the site, purchase invoice,
manufacture brochure and onsite photograph of the system.
This meets the credit requirement.
2 MR Credit 2 Handling of Construction Waste
Materials: 50 %, 95 %
2 Preliminary Review:
The submitted IGBC Green Homes Version 2 Template and narrative states that more than 95%
of the construction waste generated on-site has been reused or sent for recycling. The list of
construction waste diverted/ reused includes Steel, bricks, Cement/Concrete bags, tiles wood and
mixed waste.
Submitted calculations indicate that 18,439 kgs of the total waste generated in the project 19,204
kgs is diverted from reaching the landfills. The supporting documents include calculation sheet,
Construction Waste Management plan, challans from scrap dealers and photographs waste
reused at site.
This meets the credit requirement.
Materials & Resources Points Available:
Created on behalf of IGBC
Copyright IGBC Green Homes Rating 2007 Page 9 of 14
Site Selection & Planning Points Available:
Aw
ard
ed
Den
ied
2 MR Credit 3 Reuse of Salvaged Materials: 1 %,
2 %
4 Preliminary Review:
The submitted IGBC Green Homes Version 2 Template and narrative states that at least 1% of
the total material cost used in the project is from salvaged material. The project has used stone
from existing building for external facade of this project.
Submitted calculations indicate that the salvaged material used in the project accounts to Rs
2,35,980 out of the total material cost of Rs1,41,37,974. The supporting documents include
calculation sheet and photographs of the existing and new building indicating the reuse of stone.
This meets the credit requirement.
2 MR Credit 4 Materials with Recycled Content:
10 %, 20%
2 Preliminary Review:
The submitted IGBC Green Homes Version 2 Template and narrative states that more than 20%
of all the materials used in the project constitutes recycled content. Submitted master material
sheet calculation indicates that the project has sourced materials with recycled content which
constitutes 44.6% (Rs 6,306,276) of total building material cost (Rs1,41,37,974) cost. The
materials with recycled content include RMC, AAC Blocks, Steel, Glass, Tiles, Gypsum plater.
The submittal includes the master material sheet and the vendor letters confirming the recycled
content percentage.
This meets the credit requirement.
4 MR Credit 5 Local Materials: 25 %, 50% 2 Preliminary Review:
The submitted IGBC Green Homes Version 2 Template and narrative states that the project has
sourced local materials which are manufactured with in a distance of 400 km from the project site.
The calculation indicates that the project sources local materials for 57.34% (Rs81,06,441) of
total building materials (by cost). The local materials sourced include Steel, RMC,AAC block,
plaster,etc. The supporting documents include the master materials sheet and the vendor letter
confirming local materials distance.
This meets the credit requirement.
4 MR Credit 6 Rapidly Renewable Building
Materials & Certified Wood: 50 %,
75 %
4 Preliminary Review:
The submitted IGBC Green Homes version 2 template and narrative states that the project has
sourced FSC certified wood materials for more than 75% of the wood used in the project. The
submitted calculation indicates that the project sources FSC certified wood for 84.8%
(Rs.12,65,530) of total wood used (by cost) which is Rs.14,91,750. The supporting documents
include calculations and CoC certificate.
This meets the credit requirement.
Created on behalf of IGBC
Copyright IGBC Green Homes Rating 2007 Page 10 of 14
Site Selection & Planning Points Available:
Aw
ard
ed
Den
ied
11 0 15
Y IEQ Mandatory
Requirement 1
Tobacco Smoke Control Y Final Review:
The project team has submitted photographs of no smoking signage provided in the project. This
has been verified during the virtual site audit. This meets the credit requirement.
Preliminary Review:
The submitted IGBC Green Homes Version 2 Template and narrative states that all common
areas in the development have been declared as ‘No Smoking’ zones. The supporting documents
includes no smoking policy signed by the developer. However, additional details are required to
meet this mandatory requirement.
Technical Advice:
Please provide the on-site photographs of the "No smoking" signage installed on site.
Y IEQ Mandatory
Requirement 2
Minimum Daylighting: 50 % Y Final Review:
The project team has submitted photographs of regularly occupied spaces meeting the
daylighting requirement. This has been verified during the virtual site audit. This meets the credit
requirement.
Preliminary Review:
The submitted IGBC Green Homes Version 2 Template and narrative states that project achieves
the required daylight factor of 1 and 2 in Living/Bedroom and Kitchen respectively for more than
75% of the regularly occupied areas through prescriptive approach. The supporting documents
include technical cut sheet of glass, floor plans and door/window schedule and calculation of
daylight factor. However, additional details are required to award this mandatory requirement.
Technical Advice:
Please submit photographs of regularly occupied spaces and lux levels screenshots for lower
most habitable floor.
Indoor Environmental Quality Points Available:
Created on behalf of IGBC
Copyright IGBC Green Homes Rating 2007 Page 11 of 14
Site Selection & Planning Points Available:
Aw
ard
ed
Den
ied
Y IEQ Mandatory
Requirement 3
Fresh Air Ventilation Y Preliminary Review:
The submitted IGBC Green Homes Version 2 Template and narrative states that project is
designed to meet the fresh air ventilation standards. The fresh air calculation submitted for all
naturally ventilated spaces including living rooms, kitchens & bathrooms indicate that the
minimum percentage of openable area to the total carpet area in living spaces, kitchen and
bathrooms meet the baseline criteria (i.e.13%,10% & 5% respectively). The supporting
documents include calculations, floor plans and door/window schedule.
This meets the mandatory and credit requirement.
2 IEQ Credit 1 Enhanced Daylighting: 75 %, 95 % 4 Final Review:
The project is achieving daylighting for 75% of regularly occupied spaces. Hence, 2 points are
awarded.
Preliminary Review:
Please refer to Preliminary review comments under IEQ mandatory 2.
Technical Advice:
Kindly address the technical advice stated under IEQ mandatory 2.
2 IEQ Credit 2 Enhanced Fresh Air Ventilation 2 Preliminary Review:
Please refer to Preliminary review comments under IEQ mandatory 3.
2 IEQ Credit 3 Exhaust Systems 2 Preliminary Review:
The submitted IGBC Green Homes Version 2 Template and narrative states that project has
provided exhaust system in kitchen and bathroom to meet the minimum airflow requirement. The
minimum airflow requirement for exhaust system in bathroom and kitchen in 50 cfm and 100 cfm
respectively. The supporting documents include calculations and brochure highlighting the airflow
of the fan, purchase order and photographs of installed exhaust fans.
This meets the credit requirement.
2 IEQ Credit 4 Low VOC Materials, Paints &
Adhesives
2 Preliminary Review:
The submitted IGBC Green Homes Version 2 Template and narrative states that low VOC paints,
coatings, adhesives and sealants have been used for all interior of the building. The VOC content
of the materials used is less than the VOC limit required by the credit. The supporting documents
include the test certificates/manufacture cut sheets/letters and work order for paint work in the
project.
This meets the credit requirement.
Created on behalf of IGBC
Copyright IGBC Green Homes Rating 2007 Page 12 of 14
Site Selection & Planning Points Available:
Aw
ard
ed
Den
ied
1 IEQ Credit 5 Building Flush Out 1 Preliminary Review:
The submitted IGBC Green Homes Version 2 Template and narrative states the flush-out has
been done for ten days by keeping all the windows open before the building occupied. The
supporting documents includes the letter from the developer confirming the flush out period.
This meets the credit requirement.
2 IEQ Credit 6 Cross Ventilation: 50%, 75 % 4 Final Review:
The project has submitted revised calculations indicating that project is able to achieve cross
ventilation for 55% of regularly occupied spaces. Hence, 2 point is awarded for this credit.
Preliminary Review:
The submitted IGBC Green Homes version 2 template and narrative states that the project has
designed to provide cross ventilation for more than 75% of the regularly occupied space. The
submitted calculation indicates that the project has provided cross ventilation for 81% of regularly
occupied spaces in the project. The supporting documents include calculations and floor plans
showing cross ventilation.
This meets the credit requirement.
4 0 11 ID Credit 1.1 Innovation & Design Process:
Rainwater Harvesting Roof and Non-
Roof: 95%
1 Preliminary Review:
The project has provided Rainwater harvesting for more than 95% of the total runoff. Please refer
to Preliminary review comments stated under WE Mandatory Requirement 1.
Hence, this point is awarded.
ID Credit 1.2 Innovation & Design Process:
Onsite renewable Energy
1 Final Review:
The project has withdrawn from this credit. Hence, it is considered Not Pursuing
Preliminary Review:
The project has provided Onsite Renewable Energy for 100% of the total common lighting load.
However, according to Green Homes Ver 2, Second Addendum 2016, this credit is not eligible for
exemplary performance.
Not
Pursuing
Innovation & Design Process Points Available:
Created on behalf of IGBC
Copyright IGBC Green Homes Rating 2007 Page 13 of 14
Site Selection & Planning Points Available:
Aw
ard
ed
Den
ied
1 ID Credit 1.3 Innovation & Design Process:
Solar water heating system: 95%
1 Final Review:
The project team has provided details of solar hot water system. This has been verified during the
virtual site audit. This meets the credit requirement.
Preliminary Review:
The project has provided Solar hot water system for 100% of the hot water requirement in the
project. Please refer to Preliminary review comments stated under EE Credit 3
Technical Advice:
Kindly clarify the technical advice stated under EE credit 3.
1 ID Credit 1.4 Innovation & Design Process:
Materials with recycled content: 30%
1 Preliminary Review:
The project has used materials with recycled content for more than 30% of the total material cost.
Please refer to Preliminary review comments stated under MR Credit 4
Hence, this point is awarded.
1 ID Credit 2.0 IGBC Accredited Professional 1 Preliminary Review:
The submitted IGBC Green Homes Template and narrative states that the project team has
included Ms. Manali Manjan, IGBC AP as part of the project team. The supporting document
includes certificate of the team member. This meets the credit requirement.