The Director General (Track)
RDSO,Manak Nagar,: . Lucknow.
Sub: Condonation of infringements for movement of Double Stack
Container of 2896mm(9 12’) high on existing BG low platform
bogie container flat wagon type BLCA/BLCB on specified route.
Ref: ()RDSO’s letter No. CT/Contr/BG/MG dated 19.12.2007 (ii)Railway Board’s letter of even number dt. 5.12.06.
Vide Railway Board’s letter referred at Item (ii) above, the sanction.
of Ministry of Railways was communicated for condonation of.”
infringements for movement of Double Stack Container of 2896 mm(9 72"
high on existing BG low ‘level:platform=-bogie container: flak wagon typ |
BCLA/BCLB on specified route i.e. Jaipur to Pipavav.Port, os
Now RDSO vide fetter referred at (i) above has brought out that)
their application for condonation of movernent of such stock was for
Jaipur-Pipavav Port section as well as other sections approved by Railway |
Board and to be approved in future subject to the conditions mentionek=-
in their application.
a.
In this connection, it is clarified that Board had condoned the *
infringements for movement of such stock on specified route only and
accordingly RDSO may process separate application for movement of such
stock on different routes. ann
J [mn
( T. GUPTA)
Exe. Director Civil Engg(G)
Railway Boaré—~ J
No. 2007/CEDO/SR/15 Mew Delhi, dated 3 .1.2008
Copy forwarded for information to my
CCRS, Cornpound of DRM/MERS Sshol Marg, Lucknow-O8 for information Plagsa.
— 7 — ne
| te aia ( T. GUPTA) = ee ae es TO Foy Secretary, Railway Board
} teat ale Belitiay Hoard
as siaues Will bnclesurs ROSA 2
f
4 2 Las ey a Pee OF rR;
nia re dtm
.
At Inq oe
GOGCagGGGECaGCCaACCeECCCCcCecEercececeecceceEeyr
Vv
gad aiaenle GOVERNMENT OF INDIA Qa siaiera “MINISTRY OF RAILWAYS
(aa BS RAILWAY BOARD )
No. 2007/CEDO/SD/ 16. New Delhi, dated 01.01.2008
The General Manager(Engg), eo
South Western Railway, | * .
Hubli. ‘ e
Sub: Condonation of Grade infringement to SOD in Hospet yard in connection with doubling of track by gauge conversion in SWR.
Ref: Your office letter No. W.347/DL/BNC/BAY-INGL-HPT - dt. 12.10.2007 °
With reference to your letter referred above, sent through the Chief Commissioner of Railway Safety, Lucknow, the sanction of Ministry of
Railways is here by communicated for Condonation of Grade infringement
to SOD Revised ,2004 in Hospet yard in connection with doubling of
track by gauge conversion in South Western Railway as shown in Form-
XVII and Plan enclosed with above referred application subject to the conditions that::
(i) Restriction on shunting in terms of GR 5.20
(ii) Prohibition of. shunting in the face of an
approaching train before granting line clear.
(iii) Stabling on line 2 & 3 should be generally avoided.
When unavoidable provision of ‘GR 5.23, and SRs of
SWR should be observed. '
up 2—— | ( T.Gupta )
Executive Director Civil Engg.(G) Railway Board.
No. 2007 /CEDO/SD/ 16. New Delhi, dated 01.01.2008
Copy forwarded for information to:-
1. The CCRS, Compound of DRM/NER, Ashok Marg, Lucknow -226001
w.r.t. his endorsement No. Q.11017/03/07-a0fa0 dated 05.10.07.
2.The C.R.$./Southern Circle, 7, Seshadri Road, Gandhinagar, Bangalore-560 009 .
wit tohis letter pee 17/1/2007 wat saeg, gta /1347-1348 dt.14.09.07.
SIve 3
(T.Gupta) for Secretary, Railway Board
wa
i “4
\
C.
CVC
Ce
© (
a COC
€
~
c
~ aE cor
Fad aaa GOVERNMENT OF INDIA
aq daira MINISTRY OF RAILWAYS (adr ars RAILWAY BOARD )
No, 96/CEDO/ORI/14. New Delhi, dated 02.01.2008
The Chief Commissioner of Railway Safety,
ORM NER Compound, Ashok Marg,
Lucknow-226001 . , a
Sub: Opening of the new Up Line in New Jalpaiguri - Ambari Falekata section of Katihar division of NF Railway for Public Carriage of Passengers .
Ref:(i) CCRS’s Letter No.R. 12026/1/95-RS ,dt 09.04.96 (i i}CRS/NFCircle /Kolkata letter No. 714/1/A/95/751 ,dt 24.11.95
J
With reference to your endorsement No. R.12026/1/95-RS dt 09.04.96, the
approval of Ministry of Raitways is hereby communicated to the
recommendation of Commissioner of Railway Safety, NF Circle/Kolkata for
opening of the above section for public carriage of passenger as per his
letter No. 7t4/t/A/95/751 ,dt.24.11.95
u ta
ae fC ( T.Gupta ) Executive Director Civi} Engg.(G)
Railway Board.
No.96/CEDO/ORI/14. New Delhi, dated 02.01.2008
Copy forwarded for information lo: . .
(i)The Commissioner of Railway Safety, NF Circle, 14,STRAND ROAD(12" floor),
KOLKATA-700 001 ,w.r.t. his letter No 714/1/A/95/751 ,dt.24.11.95
(ii)The Chief Engineer /Con-I1,NF Railway,Maligaon, Guwahati-7B1011.
v 2
( T.Gupta } : for Secretary, Railway Board.
Leer
L :
Lee
C.
CoCr C:
io
Se
Fr OC
OO COS
‘ane
Cc
Y siya aiarenTay GOVERNMENT OF IND et sisietes MINISTRY OF RAILWAYS |
(3a WS RAILWAY BOARD )
No.99/CEDO/ORI/27. New Delhi, dated 02
The Chief Commissioner of Railway Safety,
DRM NER Compound, Ashok Marg,
Lucknow-226001 .
Sub:Opening of the new BG Down Line between stations Kishanganj- Hatwar-kanki on Katihar division of NF Railway for Public Carriage of Passengers .
Ref:(i) CCRS’s Letter No.R.12026/1/99-RS dt 21.09.99
(iiCRS/NFCircle /Kolkata letier No. R.12026/4/99-N.F./96,d!.26.08.99
With reference to your endorsement No. R.12096/1/99-RS,dl 21.09.99, the
approval of Ministry of Railways is hereby communicated to _ the
recommendation of Commissioner of Railway Safety, NF Circle/Kolkata’ for opening of the above section for public carriage of passenger as per his
letter No. 2.12026/4/99-N.F. /96, dt. 26.08.99
Crete) l- é), Executive Director Civil Engg.(G)
Railway Board.
No. 99/CEDO/ORI/27. . New Delhi, dated 02.01.2008
Copy lorwarded for information lo: hn
(i)The Commissioner of Railway Safety, NF Circle, 14,STRAND ROAD(12" floor),
KOLKATA-700 001 .w.r.t. his letter No R.12026/4/99-N.F. /96 ,dt.26.08.99
(ii)The Chief Engineer/Con-V1 ,NF Railway,Maligaon, Guwahati-781011.
eer ae
{ T.Gupta )
for Secretary, Rai |way Board.
\
>
~79 DPD) Y
D yD)
yy
DD
INE
DP MIFWIIIIIAN
DD IIDIODD
4 AYE Aaa aah GOVERNMENT OF INDIA wet wea MINISTRY OF RAILWAYS
(ak We RAILWAY BOARD )
No.2007/CEDO/ORI/51. New Delhi, dated 02.01.2008
The Chief Commissioner of Railway Safety, DRM NER Compound, Ashok Marg,
Lucknow-226001 .
Sub: Opening of Jorai-Sriramour(Assam)- Gosaigaonhat(18Km) section converted into BG, in Alipurduar Division,’ a part of New Jalpaiguri- Siliguri Jn- New Bongaigaon (280 Km) Gauge conversion project in Katihar/Alipurduar division of NE Railway for Public Carriage of Passengers .
Ref :(i) CCRS’s Letter No.R. 12036/2/2G05-CCRS,dt 27.10.2005 (ii)CRS/NFCircle /Kolkata letter No.R. 12036/2/2005/101t ,dt.22.05. 2005
With reference to your endorsement No. 8. 12036/2/2005-CCRS. dt 2/2410. 2005 , the approval of Ministry of Railways is hereby communicated to the recommendation of Commissioner of Railway Safety, NF Circle/Koikata for opening of the above section for public carriage of passenger as per his letter No. R.12036/2/2005/1011,dt. 22.05.2005
Ce up oT o/ (tote Executive Director Civil Engg.(G)
. Railway Board. . .,,
No.2007/CEDO/ORI/51. New Delhi, dated 02.01.2008
Copy Lorwarded for intormat bor fo:
(i}The Commissioner of Railway Safety, Nf Circle, 14,85TRAND ROAD(12" floor), KOLKATA-700 001 w.r.t. his fetter No R.12036/2/2005/1011 ,dt. 22.05.2005
(ii)The Chief Engineer /Con-11,NF Railway,Mafigaon, Guwahati-781011.
vee orn eG oe 7 mesmo
os ( T.Gupta )
for Secretary, Railway Board.
wah
+
:" ve aL a)
~ ee oO QA ee DNAaeT til dite! GOVERNMENT OF INDIA ‘a AG GATEY MINISTRY OF RAILWAYS
A (Au BS RAILWAY BOARD > oN A No. 2007/CEDO/SR/16 New Deihi, dated $.1.2008
> The Director General (Track) ~ RDSO,Manak Nagar,
Lucknow.
a ~ Sub: Condonation of infringements for movement of Double Stack
Container of 2896mm(9 ¥2') high on existing BG low platform “A bagie container flat wagon type BLCA/BLCB on specified route.
Ref: (i)RDSO’s letter No. CT/Contr/BG/MG dated 19.12.2007 A (ii)Railway Board’s letter of even number dt. 5.12.06.
~ . Vide Railway Board's letter referred at Item (ii) above, the sanction of Ministry of Railways was .communicated for condonation of ~ infringements for movement of Double Stack Container of 2896 mm(9 24 ~ high on existing BG fow level -platform bogie container flat wagon type . BCLA/BCLB on specified route i.e. Jaipur to Pipavav Port,
Now RDSO vide fetter referred at (i) above has brought out that. their application for condonation of movernent of such stock was for Jaipur-Pipavav Port section as well as other sections approved by Railway
' Board and to be approved in future subject to the conditions mentioned in their application,
In this connection, it is clarified that Board had condoned the infringements for movement of such stock on specified route only and accordingly RDSO may process separate application for movement of such stock on different routes.
(1, GUPTA) Exe. Director Civil Engg(G)
Railway Board
No. 2007/CEDO/SR/16 7 New Delhi, dated §.1.2008
Copy forwarded for information tot, .
CCRS, Compound of DRM/NER, Ashok Marg, Lucknow-O1 for infermation Please.
UP ame ( T. GUPTA)
For Secretary, Railway Board
OSES crepancy
CH Wea Ministry of Pailways
tay alg ~ Paliway Hoard
AKO jain a fea arr’) Issue wilh Enclesur
wire 1 Enctesura
Wifgnature ot aenaee ‘ pendl af fatty i qomis of kane... Lo . vs raee t 2A oars ttre ame atts tear
DA
25D
DID
DOD DDD
- 2IQVIOD
29
) Cary den . 74: ce / Dol 2009.
©
Oye? Tey
DO VIIINADIONDDIAD
DID
oO
PIFOIOVIIAID:
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS .
(RAILWAY BOARD)
No. 99/CEDO/ORI/12 New Delhi, dated /O-01.2008
Chief Engineer/Const.North O/o The C.A.0./Const, Western Railway, Ist floor, Station Bldg. Churchgate, Mumbai-400020,
Sub: Opening of Patch doubling between Maksi and Pir Umrod stations for passenger traffic from Km.95.86 to Km.103.40 (Up direction) on Ujjain- | Bhopal section of Ratlam Division of Western Railway.
Ref :(i) Your letter no, WNC.177/67(CRS) DT 24/31.10.2007. Gi) Bd.’s letter of even no. dt. 12.11.2007
Compliance of paras i.e. 5.5, 5.9 and 8.4 were not found satisfactory and your railway was asked to furnish remarks of above paras vide Bd’s letter ref. (ii) above. Apart from above the status of handing over of the authenticated land plans to open line was called for. Instead of furnishing remarks of above paras, your railway has re-submitted the already furnished compliance vide your letter ref (i) above.
: . be New ok ar os voy The action taken,on different item’Tecorded in Juxtaposition to the above Para’s may be furnished to CRS/Western Circle endorsing a copy to this office for communicating the approval of the opening of the section by the Board.
YU to —$—~
(T. olor Executive Director Civil Engg. (G)
Railway Board. we
Q sh Ale ”
GOVERNMENT OF INDIA A MINISTRY O¥ RAILWAYS \.
(RAILWAY BOARD) ~
-~ 1 ‘ 7 No.2007/CEDO/OR1/4 New Dethi, dated /2- 01.2008 ~~
Q :
fn . + , ' Chief Engineer/Const/East
A O/o The C.A.0./Const. ~ Northern Railway mo Kashmere Gate, * Delhi-110006. x “-_
t Sub: Report on the Statutory inspection of the newly constructed BG Non- Cc electrified line between Sultanpur and Bandhua Kala Railway Stations in c/with the doubling of this section of Zafrabad-Sultanpur-Utratia section ~ of Lucknow division of Northern Railway Prior to its opening for public a carriage of passengers.
~ Ref: Your letter no. 101.W/69/W.Spl/CRS/SLN-BDKN dt.17.10,2007. VT we
. . N The above section was inspected by CRS/Northern Cucle and opening of the section was authorized by him with certain observations. om
~ The CRS inspection report has been sent to this office with a copy to you. The ™~ compliance of the inspection report has been received in Board’s Office vide letter ” referred above. On scrutiny of the compliance it is observed that the remarks of para No. ~ 11.1 to 11.6 and 17.0 are not satisfactory.
an You are requested to take necessary action to comply with above observations. ~
The action taken on different item recorded in juxtaposition to the above Para’s may be furnished to CRS/Northern Circle endorsing a copy to this office for communicating the approval of the opening of the section by the Board.
a
CT. Gupta ) Executive Director Civil Engg. (G)
Railway Board.
Siang: ) . ee
Re in Date ohissve ron
yo
SO
yqo
iy)
2-FD
1) §
UW. i
ae yep
TP
oY)
Jaw
gna:
PINON
OIDION IOV
rye
7)
a)
H
\ QGiND Ls GOVERNMENT OF INDIA A vat MINISTRY OF RAILWAYS oo ‘ (RAILWAY BOARD) C
o
. No0.2007/CEDO/ORI/14
New Delhi, dated ]© 01.2008 om
6 \ Chief Engineer/Const/NW fo O/o The C.A.0./Const.
Northern Railway oO Kashmere Gate, ~ Delhi-110006,
Sub: Report on the Statutory inspection of the newly constructed BG new- electrified line prior to its opening for public Carriage between Bhogpur Sirwal and Tanda Urmur Railway Stations in c/with doubling of this section as a part of doubling of Jalandhar-Pathankot-Jammu Tawi section of Fiorzepur division of Northern Railway.
Ref: Your letter no. 101.W/53/W.Spl/BPRS/TDO (Sec) dt.7. 12.2007,
The above section was inspected by CRS/Northern Circle and opening of the section was authorized by him with certain observations.
ice with a copy to you. The pection report has been received in Board’s Office vide letter tiny of the compliance it is observed that the remarks of para No. 8.2, 8.5.2, 8.5.3, 8.5.4, 8.5.7 and first sub para of 8.5.9 are not satisfactory,
You are requested to take necessary action to comply with above observations. The action taken on different ite
may be furnished to CRS/Northern communicating the approval of the openi
m recorded in juxtaposition to the above Para’s Circle endorsing a copy to this office for ng of the section by the Board,
Uv com , (T. Gupta ) Executive Director Civil Engg. (G)
Railway Board.
~ WP f nyt MS ae
a
oe ke ae MAT QE GOVERNMENT OF INDIA NN TH BIW MINISTRY OF RAILWAYS C (3er ws RAILWAY BOARD )
o™ No.2006/CEDO/ORI/33. New Delhi, dated |) .1.2008
The Chief Commissioner of Railway Safety, _ DRM NER Compound, Ashok Marg, A Lucknow-226001 .
on
~ Sub: Opening’ of converted BG line from Basavana Bagewadi Road to , Bijapur stations of Gadag- Bagalkot- Bijapur Gauge Conversion -_ project from MG to BG in Hubli Division of division of a S.W.Railway for public carriage of passengers.
we Ref: (i) CCRS’s Letter No.R.12037/02/2006-CCRS dt 01.08.2006 aC (ii)CRS/SC/SBC letter No .R.12037/5/2006-SWR/703-712 dt. 03.7. 2006
oN
co “ With reference to your endorsement No. R. 12037/02/2006-CCRS dt 01.8.2006, Oo the approval of Ministry of Hailways is hereby communicated to the
rm recommendation of Commissioner of Railway Safety, Southern Circle, Bangalore _ for opening of the above section for public carriage of passenger as per his ~ letter No. R.12037/5/2006-SWR/703-712 dt. 03.7.2006. om
~ frre “
( T.Gupta ) io Executive Director Civil Engg.(G) oo
Railway Board.
co No. 2006/CEDO/ORI/33. New Delhi, dated |{ .1.2008 nN
~ Copy forwarded for information to: , -_ (i) The Commissioner of Railway Safety, Southern Circle, 7, Seshadri Road, ~ Gandhinagar, Bangalore - 560 009, w.r.t. his letter No. R.120637/5/2006- ‘ SWR/703-712 di. 03.7.2006 o~ (ii)The Chief Administrative Officer (Const.),South Western Raitway,18, Millers ~~ Road, Bangalore-560 046.
o
ay . at a
~ ( |.Gupta )
~ for Secretary, Railway Board. rN “
&
2 Jd)
‘Diy DevX
YOY
‘VD
DDD
) Day
oy)
t)
od)
2PDPWID I)
oY)
‘)
2D
v Se
OTT QL GOVERNMENT OF INDIA Ae Bye MINISTRY OF RAILWAYS
(Fas Bs RAILWAY BOARD )
No.2005/CEDO/ORI/43 NFR. New Delhi, dated /1.01.2008
The Chief Commissioner of Rai lway Safety, DRM NER Compound, Ashok Marg, Lucknow-2?6001,.
Sub: Opening of newly converted BG line between Dibrugarh and Makum(55.62Kms) in Tinsukia division of NF Railway for Public Carriage of Passengers .
Ref:(i} CCAS's Letter No.R.12036/3/97-RS ,dt 18-12-1997 (ii )CRS/NFCircle ‘Kolkata letter No. R.11036/3/97/NFC/419, dt 14-08-1997
~
With reference to your endorsement No, R.12036/3/97-RS at 18-12-1997, the approval of Ministry of Ratlways is hereby communicated to the recommendation of Commissioner of Raiiway Safety, NF Circle/Kolkata for opening of the above section for public carriage of passenger as per his letter No. R.11036/3/97/NFC/419,dt 14-08-1997
J “ha ( T.Gupta )
Executive Director Civil Engg. (G) Railway Board.
No.2005/CEDO/ORI/43 NFR, New Delhi, dated |; .01.2008
Copy forwarded for information to: (i)The Commissioner of Railway Safety, NF Circle, 14,STRAND ROAD(12" floor),
KOLKATA-700 001 .w.r.t. his letter No .11036/3/97/NFC/419 dt 14-08-1997 (ii)The Chief Engineer /Con-1!1,NF Raiiway,Maligaon, Guwahati-781011.
ay~ Lae
( T.Gdpta ) for Secretary, Railway Board.
) ny
D1yid
)
DIM)
fy
IIIIOID
Ds
22
4 Se on
ys a
16
if a
i SNe Vee GOVERNMENT OF INDIA oA IH VA MINISTRY OF RAILWAYS
(Fert wre RAILWAY BOARD )
No.2006/CEDO/ORI/43. New Delhi, dated I! -01-2008
The Chief Commissioner of Railway Safety, DRM NER Compound, Ashok Marg, Lucknow-226001 . eee
Sub: Opening of ‘new down main line broad gauge section after doubling between Naini Station of Allahabad Division and Link Jn. Station in Jhansi Division of N.C.Railway for public Carriage of passengers . Ref:(i) CCRS’s Letter No.R. 12025/01 /2006-CCRS, dt 25.08.2006 (i i)CRS/Nor th Eastern Circle letter No.600/1/E/0PG/Pt. /ALD/740 dt.02/8/06.
With reference to your endorsement No. R.12025/01/2008-CCRS, dt 25.08.2006, the approval of Ministry of Railways is hereby communicated to the recommendation of Commissioner of Railway Safety, North Eastern Circle/l.KO for opening of the above section for public carriage of passenger as per his letter No. 600/1/E/0PG/Pt. /ALD/740 dt .02/8/06.
Uw “hoe
( T.G@upta ) Executive Director Civil Engg.(G)
Railway Board.
No .2006/CEDO/ORI/43. New Delhi, dated /{-01-2008 YIN
OD
Copy forwarded for information to: (i) Tne Commissioner of Railway Safety, Norih Eastern Circle, Hazratganj ,
Lucknow-226001 w.r.t. his letter No.600/1/E/0PG/Pt./ALD/740 dt.02/8/08. fii) The CE(C)/North, North Central Railway , Allahabad.
Le meet inacmmacnant Shien
( y / te
uff ee
( T.Gupta } for Secretary, Railway Board.
Te :
OS
4 HE
(27
dey ct aaantesy GOVERNMENT OF INDIA
Ae sacra MINISTRY OF RAILWAYS ; (ert WS RAILWAY BOARD ) ~
” No.2006/CEDO/ORI/7. , New Delhi, dated {f.01.2008 wr
i The Chief Commissioner of Rai tway Safety, ~ DRM NER Compound, Ashok Marg, ry Lucknow-226001 .
‘
o~,
o Sub:Opening of newly converted BG Jine between Fakiragram and ~ Salakati(19Kms) in Altpurduar division of NF Railway for Public ~ Carriage of Passengers . : ~ Ref:(i) CCRS's Letter No. R,12036/3/2005-CCRS, dt 27-10-2005
~ (i i)CRS/NFGi rete ‘Kolkata letter No.2. 12036/7/2005/473,dt 04.10.2005
fo
With reference to your endorsement No. R.12036/3/2005-CCRS dt 27-10-2005, ~, the approval of Ministry of Railways is hereby communicated to the
recommendation of Commissioner of Railway Safety, NF Circte/Kolkata for om
. opening of the above section for public carriage of passenger as per his c~ letter No. R.12036/7 /2005/473 , dt .04.10.2005
~ 4
a { T.Gupta )
Executive Director Civil Engg. (G) Ne
Railway Board. on
~ No.2006/CEDO/ORI/7. New Delhi, dated |{ .01.2008
~ Copy forwarded for information to: ~ (i)The Commissioner of Railway Safely, NF Circle, 14,STRAND ROAD(12" floor), o™ KOLKATA-700 001 w.r-t. his letter No R.12036/7/2005/473 ,dt 04.10.2005 ~ (ii}The Chief Engineer /Con-I1,NF Railway,Maligaon, Guwahat i-781011. \
mN uy “Le
a rs en ( T.Gupta ) 7 | : a for Secretary, Railway Board. ™
. .
™ i i
ce
~ es ~ Ie - PSL nd {
‘)
a)
oy AY
a.
fyrDe)
id>ER
LY
ty
0)
) é \ sy OD
OOD
VIE)
CPD OF
2) >)
‘2D
")
Oly GOVERNMENT OF INDIA 13 MINISTRY OF RAILWAYS
(RAILWAY BOARD)
No.2007/CEDO/OR1/30 New Delhi, dated 14-.01.2008
Chief Engineer/C/NW O/o The C.A.0./Const. Northern Railway, Kashmere Gals, New Delhi.
Sub: Opening of newly constructed BG Non-electrified MG Line between Suchipind-Bhogpur Railway station in connection with the doubling of this section as a part of Jalandhar-Pathankot-Jammu Tawi on Firozepur Division of Northern Railway prior to its opening for public carriage.
Ref: Your letter no. 101-W53/W.Spl.?CRS/SCPD-BPRS dt.05. 12.2007.
The above section was inspected by CRS/Northern Circle and opening of the section was authorized by him with certain observations.
The CRS inspection report has been sent to this office with a copy to you. The compliance of the inspection report has been received in Board’s Office vide setter referred above. On scrutiny of the compliance it is observed that the remarks of para No.8.4, 8.5.5 (Bridge no.$5 ballast cushion to increase), 10,9, 12.1, 12.2, 12.3, 12.4.1 and 12.4.3 (status of closing L/c' no.42-C) are not satisfactory.
You are requested ic take necessary action to comply with above observations.
The action taken on different item recorded in juxtaposition to the above Para’s may be furnished td CRS/Northern Circle endorsing a copy to this office tor communicating the appreval of the »pening of the section by the Board.
Te La (T. Gupta )
Executive Director Civil Engg. (G)
Railway Board.
trie Mingier ." Hway
s KI i
Rae Signiu.t.. cre Wak ae saan eee
aida at ta & Pate of Issuc .... penn
")
‘)
a)
Yayo
ey
} yyy
) )
Me °? yO”
‘3
Sy
:
o}
2 ; PPD
ED
ce
Wad Baca GOVERNMENT OF INDIA Ya dae MINISTRY OF RAILWAYS
(AAA BTS RAILWAY BOARD )
No.2006/CRDO/ORI/44, New Dalhi, dated 2} ,1.2008
The Chief Commissioner of Railway Safety, DRM NER Compound, Ashok Marg,
Lucknow-226001 .
Sub: Opening of converted BG line from Bagalkot to Basavana Bagewadi Road stations of Gadag- Bagalkot- Bijapur Gauge Conversion project from MG to BG in Hubli Division of S.W.Railway for public carriage of passengers.
Ref: (i) CCRS’s Letter No.R.12037/03/2006-CCRS,dt 04.10.2006 one gien (i i)CRS/SC/SBC letter No.R.12037/6/2006-SWR/Vol .11/1210-220dl. 31.8.06
With reference to your endorsement No. R.12037/03/2006-CCRS,di 04.10.06,
the approval of Ministry of Railways is hereby communicated to the
recommendation of Commissioner of Railway Safety, Southern Circle, Bangalore
for opening of .the above section for public carriage of passenger as per his
letter No. R.12037/6/2006-SWR/Vol.11/1210-220dt. 31.8.06.
uf
{ T.Gupta )
Executive Director Civil Engg.(G)
Railway Board.
[. be: Oe eerinierion
No.2006/CEDO/ORI/44. New Delhi, dated m.1,2008
Copy forwarded for information to:
(i) The Commissioner of Railway Safety, Southern Circle, 7, Seshadri Road,
Gandhinagar, Bangalore ~ 660 G09, w.r.t. his lelter No. R.12037/6/2006- -
SWR/Vol. LL /1210-220d1. 31.8.06
(ii) The Chief Administrative Officer {Consl.),South. Western Railway,18,
Millers Road,Bangalere-560 046.
Vv be te
( T.Gupta )
“for Secretary, Raliway Board.
G
: “Sets
pao 9: “eed en
teem ne
on
dey
yd
hp)
PL
vd
OD
‘)
ve . a Te OE
aac BMH GOVERNMENT OF INDIA Yer sige MINISTRY OF RAILWAYS
(aaa aS RAILWAY BOARD )
No.2004/CEDO/ORI/81. New Delhi, dated 2 1.01.2008
The Chief Commissioner of Railway Safety, DRM NER Compound, Ashok Marg, Lucknow-226001 .
Sub: Opening of newly converted BG line between Samuktala Road and Jorai(18Kms) in Atipurduar division of NF Railway for Public Carriage of Passengers . ee
Ref:(i) CCRS’s Letter No. R. 12036/02/2004-RS,dt 02/9/04 (ii)CRS/NFCircle /Kolkata letter No. R. 12036/4/2004/420 dt 09/7/04
With reference to your endorsement No. R.12036/02/2004-RS,dt 02/9/04, the approval of Ministry of Railways is hereby communicated to the recommendation of Commissioner of Railway Safety, NF Circle/Kolkata for opening of the above section for public carriage of passenger as per his letter No. R.12036/4/2004/420,dt 09/7/04
——
( T.Gupta ) Executive Director Civil Engg.(G)
Railway Board.
No.2004/CEDO/ORI/81. New Delhi, dated 21.01.2008
Copy forwarded for information to: , (i)The Commissioner of Railway Safety, NF Circle, 14,STRAND ROAD(12" floor),
KOLKATA-700 001 ,w.r.t. his letter No R.12036/4/2004/420 ,dt 09/7/04 (ii)The Chief Engineer/Con-2,NF Railway Mal igaon, Guwahat i-781011.
u i 2.
( T.Gupta )
for Secretary, Railway Board.
“b |
C:
¢,
C1
ft
fy
f CoO OO
one
Cy
Cb
C0,
Cc O
dW gad atacntey GOVERNMENT OF INDIA Qa Balers MINISTRY OF RAILWAYS
(aa Ws RAILWAY BOARD )
No.2005/CEDO/ORI/42. New Delhi, dated 21.01.2008
The Chief Commissioner of Railway Safety,
DRM NER Compound, Ashok Marg,
Lucknow-226001 .
Sub: Opening of New BG non electrified line designated as up line
between Mukerian and Beas Block-Hut on coubling on Jal tandhar-
Pathankot section on Firozpur division of Northern Rai \way .for
Public Carriage of Passengers.
Ref:(i) CCRS's Letter No.R.11014/01/2005-CCRS dt 16.11.05
(i4)CRS/Nor thern Circle/N.Delhi, letter No.R/12014/42/04-05/NC/1015-.27,
dt.31.10.05.
With reference to your endorsement No. R.11014/01/2005-CCRS,dt 16.11.05,
the approval of Ministry of Railways is hereby communicated to the
recommendation of Commissioner of Railway Safety, Northern Cirele/N.Delhi for
opening of the above section for public carriage of passenger as per his
letter No. R/12014/42/04-05/NC/1015-27, dt.d1.10.05,
( pte) Executive Director Civil Engg.(G)
Rai lway Board.
No .2005/CEDO/ORI/42. New Delhi, dated 21.01.2008
Copy forwarded for information to:
(i) The Commissioner of Railway Safety, Northern Circle, Chankyapuri, New Delhi
w.r.t. his letter No. R/12014/42/04-05/NC/1015-27, dt.31.10.05.
(ii) The CE(G )/NW, Northern Railway, Kashmere Gate, Delhi~ 110006.
ae ne
|
( 1 lpta , for Secretary, Railway Board.
wo
acer ° ay
oe sentences SAN
SPE
% So.
)
7-2 GJ
ays
Wi
i)
oy
>)
a)
ry)
YOY
YVO
-)
) yu)
+) ()
py
> fy Dd
% Ie.
gga alaaile GOVERNMENT OF INDIA
Ya daieta MINISTRY OF RAILWAYS
(aa Brs RAILWAY BOARD )
No,.2001/CEDO/ORI/5. New Delhi, dated 21! .1.2008
The Chief Commissioner of Rai way Safety,
DRM NER Compound, Ashok Marg,
Lucknow-226001.
Sub: Doubling of track between Quilon and = Trivandrum Central-
proposed cut and connection for Up main line from km. 182/41-12
to km. 187/5-6 between Varkala and Kadakavur stations of
Trivandurum Division of Southern Railway for public carriage of
passengers.
Ref: (i) CCRS’s Letter No.R.12027/4/2000-RS,d1 25.08.2000
(i i)CRS/SC/SBC letter No.R.12027/1/2000-SR dt. 18.07.2000
With reference to your endorsement No. R.12027/4/2000-RS, dl
25.08.2000, the approval of Ministry of Railways is hereby communicated to the
recommendation of Commissioner of Railway Safety, Southern Circle, Bangalore
for opening of the above section for public carriage of passenger as per his
letter No. R.12027/1/2000-SR dt. 18.07.2000.
ty ( T.Gupta )
Executive Director Civil Engg.(G)
Railway Board.
No.2001/CEDO/ORI/5. New Delhi, dated 2{.1.2008
Copy forwarded for information to:
(i) The Commissioner of Railway Safety, Southern Circle, 7, Seshadri Road,
Gandhinagar, Bangalore -. 560 009, w.r.t. his letter No. R 12027 /1 £2000-SR
dt - 18.07 - 2000
ole lw
(ii) The Chief Engines
for Secretary, Railway Board. N
s I.
aud, Tr ivandrum-14
Dy b ttc
Duty oF isso ees
9 yay
PFD WVIMWDY
v
Iy
Wad alacHry GOVERNMENT OF INDIA ea aAarata MINISTRY OF RAILWAYS (Raa ws RAILWAY BOARD )
No.2000/CEDO/ORI/12., New Delhi, dated 2;.1.2008
The Chief Commissioner of Railway Safety,
DRM NER Compound, Ashok Marg,
Lucknow-226001 .
Sub: Conversion to BG from MG of the single line section between
Hosur and Omalur stations of Bangalore Division of Southern
Railway for public carriage of passengers.
Ref: (i) CCRS’s Letter No.R.12037/3/96-RS,dt 10.12.97 (i i)CRS/SC/SBC letter No.R.12037/4/96-SR dt. 21.10.97
With reference to your endorsement No. &.12037/3/96-RS.d!
10.12.97, the approval of Ministry of Railways is hereby communicated to the
recommendation of Commissioner of Railway Safety, Southern Circle, Bangalore
for opening of the above section for public carriage of passenger as per his
letter No. R.12037/4/96-SR dt. 21.10.97.
( T.Gupta )
Executive Director Civil Engg.(G)
Railway Board.
No.2000/CEDO/ORI/12. New Delhi, dated 2|.1.2008
Copy forwarded for information to:
(i) The Commissioner of Railway Safety, Southern Circle, 7, Seshadri Road,
Gandhinagar, Bangalore - 560 009, w.r.t.. his lelter No. R.12037/4/96-SR
dt. 21.10.97
(ii) The Chief Engineer /S&RB/CN/MS, Southern Railway ,Egmore, Chennai-600 008
oa ( T.Gupta )
for Secretary, Railway Board.
__.\
fa - 9p) ey
* a ae
A a . NALNIT vo ~ O GOVERNMENT OF INDIA
~ i MINISTRY OF RAILWAYS
- (RAILWAY BOARD)
om
~ No. 2006/CEDO/SR/8 New Delhi, dated 241.2008
~
oO + 1 . vt lhe Principal Chief Engineer,
~ East Central Railway,
~ Hajipur. Pn
rn Subject:- Running of Garib Rath Trains with enhanced capacity coaches
nf Reference:- (VAGM/ECRailway’s letter No. W--8/552/CRS/Garib Rath/PNBE-JA4
- Dated 18.1.2008.
o (ii)ED/Coaching, Railway Board’s letter No. 2007/Chg.1L/30/1/Part
— dated 21.!.2008.
~ Vide fetter referred at item (ii) above (copy enclosed), Railway Board have
ne accorded approval for running of Garib Rath Trains between Patna- Howrah, pending CRS
~ sanction for a period of 3 months from the date of issue of the letter. The Railway has also
x been advised to initiate immediate actior: fer obtaining CRS sanction for running of these trains
~ based on the speed certificates issued by KIDSO for such type of coaches.
o . ™ + = 7 . + .
It is requested that for regular running of trains as per new design of Rolling Stack
oO (ie. WACCNHI type coaches), immediate action may be taken for obtaining sanction of
CRS/CCRS and Railway Board.
om” Che .
om DA: As above v yfeen
: , (T.GUPTA) —¢
~ Executive Director Civil Engst
a Railway Board
on.
A Copy to:- DG/RDSO, Manak Nagar, | weknow for information and necessary action.
~
io
Riilway’ Board -
ATS he | quart
rar at aiiegement for 22.8 axte toad BCNIT Wagon.doc
J Dd DK
OD
in
“yo
YD
HY
-D a9
VOD)
Pe
Y VY
OH
J Oo vy
y a)
)
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
RAILWAY BOARD
No.2007/Chgil/30/1/Part Dated:21.01.2008
GMs f
All Indian Railways
Subject. Running of Garb Rath Trains with enhanced capacity coaches
Garib Rath trains comprising of enhanced capacity AC Ill tier coaches
[WACCNH I], AC Chair cars [WACCZH] and Power Cars [WRRMDAC]
have been planned for introduction during 2007-08. The first such train
between Patna— Kolkata comprising of 2 power cars, 3 AC Chair Cars and 7
AC Bil Tier sleeper coaches is proposed to be introduced Ex-Paina w.c-f.
22.01.2008.
Pending CRS sanction for ranning Garib Rath trains as above on Zonal
Railways, Board [MM, MT, ML, ME] have accorded approval for running
these trains for a period of 3 months from the date of issue of this letter.
Railways may initiate immediate action for obtaining CRS sanction for these
trains based on the speed certificates issued by RDSO for such type of
coaches.
[P.Guha] Executive Director / Coaching
Cic to:
Director General, RDSO, Lucknow
ENnce |o
uy
cr wad atanre GOVERNMENT OF INDIA of | Aw, ew ao darera MINISTRY OF RAILWAYS
a (Jae wrs RAILWAY BOARD )
mo No. 2007/CEDO/SR/23 New Delhi, dated 4.2,2008
~ The Director General (Track) R.D,S.0,
o Lucknow — 226011.
c Sub: Condonation of infringements for 22.9t axle load *BCNHL’ Wagon.
om Ref: RDSO’s letter No. CT/DG/LW/BCN dated 21.11.2007 & 9.3.2007.
co Vide above referred letters, RDSO has sought condonation to infringements of new A wagon namely ‘BCNHL’(22.9t axle load). The application has been forwarded by CCRS/Lucknow
with four stipulations as follows:-
om {i) 150 mm clearances to be ensured even by removing infringements if ~ any for operation of these wagons at speeds upto 75 Kmph. . (ii) Railway should issue infringement clearance certificate including for Cm OHE, before operation of wagon. “ (ili) These wagons should run on specified route only with prior approval of rN Board.
(iv) RDSO should incorporate all conditions regarding condonation and oOo running of these wagons in their speed certificate.
CO 2. On going through the case, Board (MT, MM, ME & ML) have observed that:-
co (i) The dimension of ‘BCNHL’ Wagon is not similar to Garibrath coaches as width of Garibrath was 3245mm viz. 3450mm in ‘BCNHL’ Wagon
cc (ii) Universal application of these wagons is not achievable with proposed an dimensions
~ (ili) All goods platform copings and projections of COP of both goods and me passenger platform wili have to be tackled for achieving 150 mm clearance
: beyond MMD. > (iv) RDSO may also work out the kinetic profile of wagon for achieving '
225mm clearance beyond MMD required for running these wagons at ~ speed above 75 Kmph. an
3. In view of above, RDSO is requested to kindly re-submit the proposal along with kinetic
rN profile for achieving 225 mm clearance beyond MMD either within SOD Revised, 2004 for universal application of the wagon or with suitable design for running in specified routes only.
oo
cs 3 9
~ (T. GUPTA) Executive Director Civil Engg(G)
O° Railway Board
rm Copy forwarded for information to:-
oN wd The Chief Commissioner of Railway Safety, Compound of DRM/NER, Ashok Marg, LTT ee ow-226001 with reference to his endorsement No. Q 17013/01/2007 dt. 8.5.2007.
can , Waa EDME (Freight)/Railway Board.
- “Ce: ADocuidtentsy ind Settiggs\edceg\My Documents\Condonation of infringement for 22.9t axle load BCNHL Wagon.doc 1
oN * “tlonurs _ 7
ramet Bato of leur ..
o~
2D Ysp
BD
Cy
> Dip
OD )
) 2XOD DD
‘)
yy.)
£2
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS
(RAILWAY BOARD)
No. 2001/CEDO/SD/9 New Delhi, dated 07.02.2008
The Director General,
R.D.S.0. Manak Nagar,
Lucknow.
Subject:-Arsikere-Hassan-Mangalore gauge conversion project of
S.W.Railway — Provision of catch siding in Sakleshwar-
Subramanya Road Ghat Section
Reference :- (i)This office letter of even number dated 18.12.2006 & 5.7.2007 &
30.10.2007. (ii) ED(Traffic)/RDSO’s letter No. 96/TFC/C. Siding dated
20.12.2007.
Vide Board’s letters referred above, RDSO was requested to make out
necessary changes in “ The Railways Opening for Public Carriage of Passengers, Rules
2000" — FORM XV-STATION WORKING - Question No. 46 Note No. 2 — treating
locos fitted with AEB devices at par with the catch siding.
However, vide letter referred at (ii) above, RDSO has sent the revised
criteria for provision of catch siding in form of minutes of meeting which will not serve
the purpose.
To process the case further in Board’s office, RDSO may kindly submit the
proposed changes in the above Rules in juxta position to the existing tules along with |
criteria for cut off gradient for provision of catch siding with the recommendation of
CCRS/LKO.
ya (T. GUPTA): Executive Director Civil Engg(G)
Railway Board
CADocuments and Settings\edceg\My Documents\Provision of catch siding-Assikere-Mangalore gauge conversion project.dac 1
x
24 gad atazarey GOVERNMENT OF INDIA
j Ya sisietal MINISTRY OF RAILWAYS (2am ars RAILWAY BOARD )
ot
co
o™ co
co
o™
o
oO
co Cc
Cc
o
oO
O
C e™
oO
co
o
cs
o
O
'.
o
No. 2007 /CEDO/SD/17. New Delhi, dated 08.02.2008
The General Manager(Engg), West Central Railway, Jabalpur.
Sub: Condonation regarding laying of 1 in 12 turn out in existing
1 in 169 grade( construction of additional loop at Vijaypur station).
Ref: Your office letter No.WHQ/311/BR/CRS/VJP(Add.Loop)
dt.07 /06/2007
With reference to your letter referred above, sent through the Chief Commissioner of Railway Safety, Lucknow, the sanction of Ministry of
Railways, Railway Board is here by communicated for Condonation regarding laying of 1 in 12 turn out in existing 1 in 169 grade for construction of
additional loop at Vijaypur station in West Central Railway as shown in Form-XVII and Pian enclosed with above referred application with Board’s
comments as under:
(a) Precautions during shunting:
1. It should be ensured that the engine is leading in the falling direction
while performing shunting.
2. No shunting should be performed towards main line beyond outermost
points in the direction of approaching train both in Up and Down
directions after granting line clear to a train except in NFL and GAIL
sidings.
3. Loose and hand shunting be prohibited. Shunting should be done
entirely coupled up with vacuum/air pressure throughout. Hands brake
of vehicles left behind be tightened and secured as per G&SR 5.23.
ce (b) Precautions while stabling:
. ile stabling load in the yard it should be ensured that the provisions
“as contained in G&SRs 5.23 are strictly complied with.
?
Ty tae ajay vi a flwoyt
os : Yoad or vehicles without live engine should not be stabled on running
RN! cura lines specially on main line. Guard and Loco Pilot of the train should
i SO .£psure application of hand brake of engine and brake van in addition to
I@co brakes while standing on running lines.
= a! : | ZZ (page 1/2)
FOV IIIIVIIIVIIAIDIDIIDIN9III9IDIIIID
9FIDIODWOD
a>
3. Before detaching train engine for any reason, it should be ensured that brakes of at least 6 goods vehicles at both ends of the train in addition to brake van hand brakes should be applied.
4. If the brake van is also detached from the load at least the hand brakes of 6 more vehicles should be applied.
J VT
( T.Gupta ) Executive Director Civil Engg.(G)
Railway Board.
No. 2007/CEDO/SD/17. New Delhi, dated 08.02.2008
Copy forwarded for information to:- l.
2,
The CCRS, Compound of DRM/NER, Ashok Marg, Lucknow -—226001 w.r.t. his endorsement No. Q.11011/02/2007-a0fo dt. 23.11.07. The Commissioner of Railway Safety, Central Circle, 2° Floor, Churchgate Stn. Bldg. Annexe, M.K. Road, Mumbai - 400 020 w.r.t. letter no. C- 13(175)/383, dated 17/08/2007
Obes) for Secretary, Railway Board
x Haas z .
inistry Of Railweys Minis Sea Ws
\
)
»>.999979939909099
25
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS
(RAILWAY BOARD)
No. 2005/CE-VCBL/2 New Delhi, dated }3 .02.08
The General Manager (Engg.), Eastern Railway, Kolkata.
Sub: Banning of business dealings with MESA Constructions, Kolkata, : for 3 years.
Ref: Board’s letter of even number dated 03.01.2008
o™ eke
Nn ,
Enclose please find a copy of the Order dated 21.01.2008 of the o~ Hon'ble High Court, Calcutta, with regard. to the WP No.1144 (W) of 2008 oO (Sri Debasis Chatterjee versus Union of India & Ors).
mo You may kindly arrange one certified copy from the Hon’ble Court and send the same to Railway Board alongwith your comments. £™
_ Matter may be treated as most urgent.
r™ a.
(T. GUPTA) ~ Exec. Director, Civil Engg.(G) oN Railway Board -
om
pO DA: As above Me ' cn
A 7 whe
oO RE _.
ej oe
C:AMy Documents\AAdesh\CBL.doc 1 f™
a
aN
a
> ?
JX VXDD
YY
> J
) D9
) > Fd
DDD
DD
YD f
“)
96
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS
(RAILWAY BOARD) o
No. 99/CEBGs 921/21. —
The Chief Commissioner of Railway Safety, DRM NER Compound, Ashok Marg, Lucknow-226001.
New Delhi, dated (& .02.2008 ©
Sub: Opening of new BG Electrified Up line between Tyakal and Malur stations of SEC Division of sw Railway for Carriage of Passengers, ,
Ref: (i) CCRS’s Letter No. R.12027/1/99-RS dated 09.06.99 (ii}CRS’s (Southern Circle) letter No. R-12027/4/99-sR dated 15.04.99
taser
With reference to your endorsement No. R.12027/1/99-RS dated 09.06.99, the approval of Ministry of Railways is hereby communicated to the recommendation of Commissioner of Railway Safety, Southern Circle, Bangalore for opening of the above section for public carriage of Passengers as per his letter No. R-12027/4/99-SR dated 15.04.99,
J
, ( rolpta) L Executive Director Civil Engg.(G)
Railway Board, No. 99/CEDO/ORI/21. New Delhi, dated /.02.2008 Copy forwarded for information to: (i) The Commissioner of Railway Safety, Southern Circle, 7, Seshdri Road, Gandhinagar, Bangalore-560009, w.r.t. his letter No. R-12027 /4/99-SR dated 15.04.99, (ii) The Chief Administrative Officer (Const.),South Western Railway, 18, Millers Road, Bangalore-560046. (iti)/The General Manager (Engg), South Western Railway, Hubli.
Ct
( malin ) for Secretary, Railway Board.
>I. 9)
% >I 27).
+I PF FVD Vid
1D DY
(A
1}
‘4
v &7
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS
(RAILWAY BOARD) No, 2004/CEDO/ORI/61. New Delhi, dated 18 -02,.2008 3 he in ‘dete The Chief @8imissioner of Railway Safety, DRM NER Compound, Ashok Marg, Lucknow-226001,
Sub: Opening of Railways-Guage conversion between Salem and Yeshwantpur-Opening of the Gauge converted line between Baiyyappanahaili (‘A’ cabin excl. Km. 402.750) and Yeshwantpur (excl. Km. 421.943) for public carriage of passengers.
Ref: (i) CCRS’s Letter No. Q. 12037/01/2004-TW dated 13.05.04 {ii)CRS’s (Southern Circle) letter No, R-12037/1/99-SWR . dated 24.03.04
With reference to your endorsement No, Q. 12037/01/2004-TW dated 13.05.04, the approval of Ministry of Railways is hereby communicated to the recommendation of Commissioner of Railway Safety, Southern Circle, Bangalore for opening of the above section for public carriage of Passengers as per his letter No. R-12037/1/99-SWR dated 24.03.04.
} (Tdupta) i Executive Director Civil Engg.(G)
Railway Board.
No. 2004/CEDO/ORI/61. New Delhi, dated /8.02.2008 Copy forwarded for information to: ‘ (i) The Commissioner of Railway Safety, Southern Circle, 7, Seshdri Road, Gandhinagar, Bangalore-560009, w.r.t. his letter No. R-12037/1/99-SWR dated 24.03.04. (ii) The Chief Administrative Officer (Const.),South Western Railway, 18, Millers Road, Bangalore-560046, (iii/The General Manager (Engg), South Western Railway, Hubli.
a aT
‘/ dlwaye
Signatuke ¥] Ceca de re cee
ay fate
J
( T.Gupta ) for Secretary, Railway Board.
att __.. AL Date_of issue .... ...
o™
PV
POM
) a1)
ee
a i
i) )
4
27
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS
(RAILWAY BOARD) No. 99/CESAORI/14. —
The Chief Commissioner of Railway Safety, DRM NER Compound, Ashok Marg, Lucknow-226001.
New Delhi, dated /@ .02,.2008
Sub: Opening of new BG Up Double line (Electrified) between Tyakal and Bangarpet stations of Bangalore Division of SW Railway for carriage of passengers,
Ref: (i) CCRS’s Letter No. R.12027/6/99-RS dated 04.05.99 {ii)CRS’s (Southern Circle) letter No. R-12027 /5/99-SR dated 16.04.99
With reference to your endorsement No. R.12027 /6/99-RS dated 04.05.99, the approval of Ministry of Railways is hereby communicated to the recommendation of Commissioner of Railway Safety, Southern Circle, Bangalore for Opening of the above section for public carriage of Passengers as per his letter No. R-12027/5/99-SR dated 16.04.99,
Jp ( T.Gapta )
fl xecutive Director Civil Engg.(G) Railway Board.
No. 99/CEDO/ORI/14. New Delhi, dated (R.02.2008 Copy forwarded for information to: (i) The Commissioner of Railway Safety, Southern Circle, 7, Seshdri Road, Gandhinagar, Bangalore-560009, w.r.t. his letter No. R-12027/5/99-SR dated 16.04.99. (ii) The Chief Administrative Officer (Const.),South Western Railway, 18, Millers Road, Bangalore-560046. (iii) The General Manager (Engg), South Western Railway, Hubli.
ao ne CH aeayary Ministry of Sphvage
( T.G pta ) Gi
for Secretary, Railway Board.
a
a)
‘)
i)
) ‘yd
ad)
) PtePtD
sD
DF Does wdc)
D 9
) DDD
yer | A oe mn, » ers apr GOVERNMENT OF INDIA MINISTRY OF RAILWAYS
(RAILWAY BOARD)
No.96/CEDO/ORI/29 New Delhi, dated }¥ .02.2008
The Chief A istrative Office:-(Const.),
Eastern Raiiway, Kolkata.
Sub; - Opening of the new Electrified Up line between Guma
and Ashoknagar Stations in Sealdah-Bongaon Section of
Sealdah Division of Eastern Railway for the public carriage of
passengers.
Ref: i) CCRS’s letter No. R. 12042/3/95-RS dated 05.09.96
ii) CRS/Eastern Circle/Kolkata’s letter No. 606/1/F/96/1122
dated 29.03.96 KREK
The above section was inspected by CRS/Eastern Circle/Kolkata on
29.05.95 and opening of the section was authorized by him vide his letter No.
606/I/F/95 dated 29.05.95 with certain observations. The inspection report
has been sent to this office with a copy to you.
You are requested take necessary action to comply with the various
observations made in his above letter for opening the section.
The action taken on different items recorded in the juxta position to the
above document may be furnished to CRS/Eastern Circle, endorsing a copy to
this office for communicating the approval of the opening of the section by the
Board.
o
( T.Gppta ) Exec. Director, Civil Engineering (G)
(Railway Board).
No.96/CEDO/ORI/29 New Delhi, dated \¥ .02.2008
Copy forwarded for information to the Commissioner of Railway Safety,
Eastern Circle, 14, Strand Road (12 Floor), Railway Multi Storied Building,
Kolkata-700001 with reference to their letter No. 606/1/F/96/1122 dated
27.03.96. / ns
( T.Gupta )
t Secretary, Railway Board
_
4 ry
DD
VAP) DDD
Dd JQ DG
by
oD
) 24
Saat atatnrr GOVERNMENT OF INDIA Wat daletal MINISTRY OF RAILWAYS
(Aaa Bs RAILWAY BOARD )
No. 2007/CEDO/SD/18. New Delhi, dated 20.02.2008
The General Manager(Engg), South Central Railway, Secunderabad-500 071.
Sub: Proposed Bye pass line at Renigunta connecting Gudur-
Renigunta and Gooty- Renigunta lines Condonation of
infringing gradient of 1 in 130 within the bye pass line.
Ref: Your office letter No. W.573/G/Infringing Gradient /RU Byepass
dt.20, 11.2007
With reference to your letter referred above, sent through the Chief
Commissioner of Railway Safety, Lucknow, the sanction of Ministry of
Railways, Railway Board is here by communicated for Condonation of Grade
infringement to SOD Revised ,2004 in proposed Bye pass line at Renigunta
connecting Gudur- Renigunta and Gooty- Renigunta lines for grailient of
1 in 130 within the bye pass line in South Central Railway as shown in
Form-XVII and Plan enclosed with above referred application subject to the
conditions that:
(i) The precautions as required during shunting have been brought
out in Para 8(ix) ‘Shunting on gradients(ref: GR & SR 5.20) of
Station Working Rules of Renigunta Jn.
(ii) No shunting of vehicles fitted with roller bearings will be carried
T hee
Executive Director Civil Engg.(G) Railway Board.
No. 2007/CEDO/SD/ 18. New Delhi, dated 20.02.2008
Copy forwarded for information to:-
1, The CCRS, Compound of DRM/NER, Ashok Marg, Lucknow -226001
w.r.t. his endorsement No. Q.11018/04/2007-a0fto dt. 05.12.07.
2. The C.R.S./South Central Circle, Sarojini Devi Road, Secunderabad-500 071
w.r.t. his letter No.a@a 11018/01/07 -SSC/959 dt .27-11-2007.
gL (T.Gupta)
for Secretary, Railway Board
o™
I.)
DD
) a)
‘)
Jo)
9O'D
PIP DY DD
DF DDD ODD
) DId
DLO 40
Sad alaenta GOVERNMENT OF INDIA
2a dialer MINISTRY OF RAILWAYS (ears AWS RAILWAY BOARD )
No. 2007/CEDO/ SD/ 02. New Delhi, dated 22.02.2008
The General Manager(Engg),
North Central Railway, Subedarganj, Allahabad-211033.
Sub:Condonation of existing gradient in Km 1257.920 to Km
1258.950 of Chan- Bansa Pahar section of Jhansi Division of
North Central Railway in connection with opening the section
for passenger traffic.
Ref: Your office letter No. 355-W/CRS/BANSA-OHAN (Jhansi division)
/NCR/TM dt.30.05.2007
With reference to your letter referred above, sent through the Chief
Commissioner of Railway Safety, Lucknow, the sanction of Ministry of
Railways, Railway Board is here by communicated for Condonation of Grade
infringement to SOD Revised ,2004 of existing gradient in Km 1257.920
to Km 1258.950 of Ohan- Bansa Pahar section of Jhansi Division of North
Central Railway in connection with opening the section for passenger traffic as
shown in Form-XVII and Plan enclosed with above referred application.
2—————.
( T.Gupta )
Executive Director Civil Engg.(G) .
Railway Board.
No. 2007/CEDO/SD/02. New Delhi, dated 22.02.2008
Copy forwarded for information to:-
1. The CCRS, Compound of DRM/NER, Ashok Marg, Lucknow —226001 w.r.t.
his endorsement No. Q.11015/01/2007-a0ft0 dt. 14.02.2008.
2. The C.R.S , North Eastern Circle, Hazratganj, Lucknow-226001 w.r.t. letter
no. 3494/Part-5/1436 dated 21.01.2008
v 2
(T.Gupta)
for Secretary, Railway Board
vo
+d DD
) DPV
DIIO VOOD
VWI
DD
OY
")
4
Sd aaary GOVERNMENT OF INDIA >| Qa diaterar MINISTRY OF RAILWAYS
(3AM BS RAILWAY BOARD )
No. 2008/CEDO/ SD/01 New Delhi, dt .26.02.2008
The General Manager(Engg). Southern Railway, HQ. Office, Chennai-600 003
Sub: Sanction for adopting lesser Track spacing and vertical clearance at Road over Bridge no. 1136 in Tiruchchirappalli Jn. - proposed Gauge Conversion between Tiruchchirappalli and Manamadurai Jn. of Tiruchchirappalli Division of Southern Railway.
Ref: Your office Letter No W.573/T/ 33 Dated 11/10/2007.
Vide your letter referred above, Board’s Sanction was sought for adopting lesser Track spacing and vertical clearance at Road over Bridge no. 1136 in Tiruchchirappalli Jn. - for the proposed Gauge Conversion between Tiruchchirappalli and Manamadurai Jn. of Tiruchchirappalli Division of Southern Railway.
However, while examining the proposal it is seen that the following clarifications are required from your end:
(i) The provision of proposed vertical clearance of 5365 mm against the required clearance of 6250 mm is not adequate in OHE territory at the locations of turnout zone. Railway needs to explore the possibility for provision of special catenary arrangement and also suggest design of the catenary.
(ii) | Railway should stipulate necessary instructions for running of 'C’class ODC.
(iii) Proposed over run line and line No.6 is having lateral infringements vide item no. 13{ii) bc & d, of SOD Revised,2004. These infringements are not appearing in form XVII of your application.
The reply of above clarification may be furnished to Board’s office at the earliest to process the case for further consideration of Board.
© fe (T. louptal Executive Director, Civil Engg. (G)
Railway Board.
No. 2008/CEDO/ SD/01 New Delhi, dt .26.02.2008 Copy forwarded for information to:
(i) CCRS, Compound of DRM/NER, Ashok Marg, Lucknow -226001 w.r.t. his endorsement No. Q.11017/04/2007/TW dated 27-12-2007.
(Gi) =C.RS, fi Southern Circle, 7, Seshadri Road, Gandhinagar, Bangalore-560 009 w.r.t. hig : 7 2907-08 SR/ 1996 dt.27-11-2007.
of De {T.Gupta)
for Secretary, Railway Board. TET
gnature .
erdl at Rafi .
yd
9 9
w)
2 oF DVD
VOY
JY
DD
a)
PMV
DIDIDWO DAD
DYDD
YD }
wv
Wad ashy GOVERNMENT OF INDIA
Ae
Pe Jor sister MINISTRY OF RAILWAYS 34 vw, (ea ws RAILWAY BOARD )
No. 2008/CEDO/SR/01 New Delhi, dated 26 .02. 2008
1. The General Manager/Engg, South Eastern Railway, Kolkata-43.
2. The General Manager(Engg)
North Eastern Railway, Gorakhpur.
Sub: Running of Enhanced Capacity coaches WGACCN1 & WGSCN1 with maximum axie load of 16.25t over SER & NER.
Ref: (i) S.E.Rly’s letter No. G/EOG/AC-3-Tier/Sleeper Coach, Dt:18.01.08 (ii) N.E.Rly’s letter No.W/340/BG/WGACCN-WGSCN/4A, dt. 25.09.07
In reference to above letters, the sanction of the Ministry of Railway, Railway Board is hereby communicated for Running of Enhanced Capacity coaches WGACCN1 & WGSCN1 with maximum axle load of 16.25t over SER &
NER subjected to terms and conditions as given in RDSO’s speed certificates and South Eastern Railway’s/ North Eastern Railway’s Joint Safety Certificate, Track Certificate and other Certificates accompanying above referred letters.
Te 2 —___.
( T.Gupta )
Executive Director Civil Engg.(G) Railway Board.
No. 2008/CEDO/SR/01 New Delhi, dated 26 .02. 2008
Copy forwarded for information to:- 1. The Chief Commissioner of Railway Safety, compound of DRM/NER, Ashok
Marg, Lucknow - 226001 w.r.t. his endorsement No. Q.13011/02 /2008- TW dated 13.02.2008 & 06.02:08 for SER and NER respectively.
2. The Commissioner of Railway Safety, South Eastern Circle, 14, Strand Road (12 th Floor}, Kolkata - 700 001 w.r.t. his endorsement No.1175, Dt.25.01.2008
3. The Commissioner of Railway Safety, North Eastern Circle, Hazratganj, Lucknow-226001w.r.t. his endorsement No. 3499/WGACCN1/1442/SANC-
18-A, Dt. 22.01.2008. 4, The Executive Director Standards (Motive Power), RDSO, Lucknow, w.r.t. his letter
No. SV. GR/O7/Vol-IV. 08.08.07 and No. SV.GR/07/Vol.-il! 016, dt. 07.08.07
et é 9 aliway? ‘goard L _
a ata ated carat Va (T.Gupta) i: Enclosure for Secretary, Railway Board.
Lo
igave wit
) ‘Diy
sd)
) ‘)
oy)
) +)
PDP
1D
OD
PY VV
OOD OY
f- GOVERNMENT OF INDIA MINISTRY OF RAILWAYS
(RAILWAY BOARD)
No.93/CEDO/ORI/1 New Delhi, dated 2p .03.2008
The Chief Administrative Officer (Const.), N.F. Railway, Maligaon,
Guwahati.
Sub: - Opening of the new BG down line from Sudhani to Sanjoygram and the new BG up line from Sanloygram to Barsoi in Katihar division of NF Railway for the public carriage of passengers.
Ref: Your letter No. W 260/CON/F-D/Project dated 02.09.95, REE
With reference to your letter referred above, compliance for observations
given in the CRS/N.F. Circle inspection report dated 19,02.93 for the item numbered as 4, 7.2(b), 7.3(b), 8.3(b), 8.3(a), 9.2(iv), 9.3(ii), 9.3(iii}), 12.2{a), 14,15 and 12 are not satisfactory.
You are requested to take necessary action to comply with above observations.
The action taken on different item recorded in juxtaposition to the above para’s may also be furnished to CRS/N.F. Circle endorsing a copy to this office.
( T.Gupta )
Exec. Director, Civil Engineering (G)
(Railway Board}.
ri A areata
Ca nese
ct wayn
ol
_
Pye
D DD
a)
2 2
“)
‘) POY DODD
ny
)
, o*
pe 34
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS
(RAILWAY BOARD)
No.93/CEDO/ORI/3 New Dethi, dated 79.03.2008
The Chief Administrative Officer (Const.],
N.W. Railway,
Jaipur.
Sub: - Opening of newly converted B.G, line between Nokha
and Nagour stations on Bikaner-Merta Road section of Jodhpur
division of NW Railway for public carriage of passengers. _,
Ref: NR’s letter No. 78-W/ 17/CRS/W-1/Pt. Il dated 20.09.95.
kkk
With reference to NR’s letter referred above, compliance for observations
given in the CRS/Northern Circle inspection report dated 04.03.93 for the item
numbered as 9.2, 16.1, 11.1 and 11.2 are not satisfactory.
You are requested to take necessary action to comply with above
observations.
The action taken on different item recorded in juxtaposition to the above
para’s may also be furnished to CRS/Northern Circle endorsing a copy to this
office.
Up
( nelepte )
Exec.Director, Civil Engineering (G)
(Railway Board).
v
Yr
%9
GOVERNMENT OF INDIA —
MINISTRY OF RAILWAYS
~ (RAILWAY BOARD)
- No. 95/CEDO/ORI/61. New Delhi, dated 27.03.2008
r
i. The Chief Commissioner of Railway Safety,
~ DRM NER Compound, Ashok Marg,
a Lucknow-226001.
mo Sub: New Bandra Terminus with provision of passenger Trains
A Terminal facilities (Phase I) between Khar and Bandra
Station in the Churchgate-Virar Section of Mumbai
a Division of Western Railway for public carriage of
passengers.
~ Ref: (i) CCRS’s Letter No. RS. 10-T(17)/ 92 dated 06.04.95.
(ii)CRS’s (Western Circle) letter No. 16-5/290/ H/309
~ dated 22.07.92. a
A“ With reference to your endorsement No. RS. 10-T({17)/92 dated 06.04.95,
~ the approval of Ministry of Railways is hereby communicated to the
> recommendation of Commissioner of Railway Safety, Western Circle, Mumbai
: for opening of the above section for public carriage of passengers as per his
” letter No. 16-5/290/H/309 dated 22.07.92.
~
alta) ~
( T.Gupta )
“~ Executive Director Civil Engg.(G)
~ Rail d.
~ L< way Boar
an No. 95/CEDO/ORI/61. . New Delhi, dated .03.2008
an Copy forwarded for information to:
- (i) The Commissioner of Railway Safety, Western Circle, , 24 Floor, Churchgate
° Station Bldg. Annexe, M.K. Road, Mumbai-400020, w.r.t. his letter No. 16-
5/290/H/309 dated 22.07.92.
(ii) The Chief Administrative Officer (Const.), Western Railway, 1st Floor, Station
~ Bldg, Churchgate, Mumabi-400020.
(iii)The General Manager (Engg), Western Railway, Mumbai.
Cesta) ( T.Gupta )}
for Secretary, Railway Board.
wie * Baie of ewe on ooo ~
Ween
“youd
a)
i)
of)
Dip
Dd yoy
{>
yy)
yoy
1D OD
O%
av 46
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS (RAILWAY BOARD)
No. 95/CEDO/ORI/3. New Delhi, dated 203.2008
The Chief Commissioner of Railway Safety,
DRM NER Compound, Ashok Marg,
Lucknow-226001.
Sub: Opening of the 10.18 Km. long MG single line permanent
diversion of Uttangalmangalam-Neyveli and Neyveli-
Kurinjipadi Block section on Cuddalore Port Jn.-
Vriddhachalam Jn.- MG Section in Tiruchchirappalli
division of Southern Railway for public carriage of
passengers.
Ref: (i) CCRS’s Letter No. R. 12057/1/94-RS dated 09.03.95.
(ii)CRS’s (Southern Circle) letter No. R-12057/ 1/94-
Divrn dated 19.12.94.
With reference to your endorsement No. R. 12057/1/94-RS dated
09.03.95, the approval of Ministry of Railways is hereby communicated to the
recommendation of Commissioner of Railway Safety, Southern Circle,
Bangalore for opening of the above section for public carriage of passengers as
per his letter No. R-12057/1/94-Divrn dated 19. 12.94.
fo rely Executive Director Civil Engg.{G)
Railway Board.
No. 95/CEDO/ORI/3. New Delhi, dated .03.2008
Copy forwarded for information to:
(i) The Commissioner of Railway Safety, Southern Circle, , Seshadri Road,
Bangalore-560009, w.r.t. his letter No. R-12057/1/94-Divrn dated
19.12.94. (ii) The Chief Administrative Officer (Const.), Southern Railway, Egmore,
Chennai -600008.
(iii)The General Manager (Engg), Southern Railway, Chennai.
( T.Gupta } for Secretary, Railway Board.
a)
Jove Dd
DO)
“)
Doded DDD)
1D
yyy
Diem)
2 d+)
Y ~]
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
(RAILWAY BOARD)
No. 2000/CEDO/ORI/31. New Delhi, dated 27.03.2008
The Chief Commissioner of Railway Safety,
DRM NER Compound, Ashok Marg,
Lucknow-226001.
Sub:- Opening of Broad Gauge Line from Lalkua to Kashipur
stations on Izatnagar Division of North Eastern
Railway after conversion from MG to BG for Goods and
Passenger traffic.
Ref:- (iJ)CCRS’s Letter No. R. 12035/01/2000-RS dated
21.07.2000. (iiJCRS’s (N.E. Circle) letter No. 504/1/B/OPG/P.T. dated 03.07.2000.
eenee
With reference to your endorsement No. R. 12035/01/2000-RS dated
21.07.2000, the approval of Ministry of Railways is hereby communicated to
the recommendation of Commissioner of Railway Safety, N.E. Circle, Lucknow
for opening of the above section for public carriage of passengers as per his
letter No. 504/1/B/OPG/P.T. dated 03.07.2000.
———
( T.Gupta )}
Executive Director Civil Engg.(G)
l- Railway Board.
No. 2000/CEDO/ORI/31. New Delhi, dated .03.2008
Copy forwarded for information to:
(i) The Commissioner of Railway Safety, N.E. Circle, Hazratganj, Lucknow-
226001, w.r.t. his letter No. 504/1 /B/OPG/P.T. dated 03.07.2000.
(ii) The Chief Administrative Officer (Const.), North Eastern Railway,
Gorakhpur.
(iii) The General Manager (Engg), North Eastern Railway, Gorakhpur.
J 2H
( T.Gupta )
for Secretary, Railway Board.
iS
‘)
is
dO
DD
PD DDG
Ped
PYF
DY
YY
) >
« 4}
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
(RAILWAY BOARD)
No. 99/CEDO/ORI/12. ” New Delhi, dated? 7? .03.2008
The Chief Commissioner of Railway Safety, DRM NER Compound, Ashok Marg,
Lucknow-226001.
Sub: Opening of the Patch Doubling between Maksi and Pir-Umrod stations from Km. 95,86 to Km. 103.40 (Up direction) on Ujjain- Bhopal Section of Ratlam Division of Western Railway for Public Carriage of Passengers.
Ref: (i) CCRS’s Letter No. R. 12030/1/99-RS dated 11.05.99. (iiJ)CRS’s (Western Circle) letter No. R-12030/1/98/313 dated 08.04.99.
With reference to your endorsement No. R. 12030/1/99-RS dated 11.05.99, the approval of Ministry of Railways is hereby communicated to the recommendation of Commissioner of Railway Safety, Western Circle, Mumbai for opening of the above section for public carriage of passengers as per his letter No. R-12030/1/98/313 dated 08.04.99.
irdintay Executive Director Civil Engg. (Gy
oc Railway Board.
No. 99/CEDO/ORI/12. : New Delhi, dated .03.2008
Copy forwarded for information to: {i) The Commissioner of Railway Safety, Western Circle, , 274 Floor, Churchgate Station
Bldg. Annexe, M.K. Road, Mumbai-400020, w.r.t. his letter No. R- 12030/1/98/313 dated 08.04.99.
(ii) The Chief Administrative Officer (Const.), Western Railway, 1st Floor, Station Bldg, Churchgate, Mumabi-400020.
{iii/The General Manager {Engg), Western Railway, Mumbai.
( nhpta) for Secretary, Railway Board.
) ‘PrP
JD BA
D =»
‘YD
Y JX
DD
) my
dD DDD
~~
sat @izonae GOVERNMENT OF INDIA A 2a sister MINISTRY OF RAILWAYS
(ae WS RAILWAY BOARD )
No. 2008/CEDO/SD/03. New Delhi, dated 04.04.2008
The General Manager(Engg), Western Railway, HQ.Office, Churchgate, Mumbai-20
Sub:Condonation of stipulation of SOD for Platform no. 1 &2 at
Somnath station building and condonation for implantation of
the structures i.e. signal, shunt signal and battery charging
point from rail level to formation level in Somnath yard and in
Somnath- Veravel Section of Western Railway .
Ref: CAO(C)/WR office letter No. WNC.121/11(VRL-SOM}Condo, dt.07.03.2008.
With reference to the application referred above, sent through Chief
Commissioner of Railway Safety, Lucknow, the sanction of Ministry of
Railways, Railway Board is hereby communicated for Condenation of
infringement for Horizontal clearance to SOD Revised,2004 for Platform
no. 1 &2 at Somnath station building and condonation for implantation of
the structures i.e. signal, shunt signal and battery charging point from rail
level to formation level in Somnath yard and in Somnath- Veravel Section
of Western Railway in connection with opening the section for passenger
traffic as shown in Form-XVII and Plan enclosed with above referred application
subject to the condition that::
ce ew Delhi, dated 04.04.2008 No. 2008/CEDO/SD/03. hs eee
Copy forwarded for information to:- 1. The CCRS, Compound of DRM/NER, Ashok Marg, Lucknow -226001 w.r.t. his
endorsement No. Q.12040/01/2008-aoftra dt. 19.03.2008.
2. The Commissioner of Railway Safety, Western Circle, 2 Floor, Churchgate Stn.
Bldg. Annexe, M.K. Road, Mumbai - 400 020 w.r.t. letter no. 221/40 dated 10.3.08
2
(T.Gupta) for Secretary, Railway Board.
a
Y | a //— Yo
é.
A GOVERNMENT OF INDIA MINISTRY OF RAILWAYS
rN (RAILWAY BOARD)
O No.2008/CEDO/ORI/1 ae New Delhi, dated St.o4.2008
oy
“ The Chief Engineer/Const.(North),
o North Central Railway,
Allahabad. ~
aN Sub: - Opening of New Down Main Line Broad Gauge Section
~ after doubling between Jasra Station to Madraha Station of
o~ Jhansi Division of North Central Railway for Public Carriage of
A Passenger traffic.
~ Ref: Your letter No. 56-W/249/WA/SPL/CRS dated 22.01.2008.
i kkk
~ With reference to your letter referred above, it is mentioned that CRS
rn Inspection Report dated 10.12.07 and authorization letter dated 19.09.07 have
not been received in Board office. c™
_ You are requested to send copies of CRS Inspection Report dated
~ 10.12.07 alongwith. authorization letter dated 19.09.07 to this office for
a communicating the approval of the opening of the section by the Board.
oo
C ( ndlntay on Exec. Director, Civil Engineering (G)
~ (Railway Board).
>)
Sigmaturs: Le neneneee
wie aT feriy Diate CT 12 wee cconeeen nae conanonsens
YOO IIIA}
7D I9DD
)
“~ Rem _- Flat QrwHlY GOVERNMENT OF INDIA \er at Yat daiata MINISTRY OF RAILWAYS
\ (Jad Bs RAILWAY BOARD )
No. 2007/CEDO/SR/23 New Delhi, dt. 11. 04. 2008
The PCEs / CE(Co-ord) All Zonal Railways and MD/KRCL
Sa
Sub: Route Clearance for running of goods trains with BCNHL B.G. wagons .
Ref: RDSO’s letter No CT/OG/LW/BCN dated 21.11.07 & 9.3.07
>> 2997799929
It is proposed to run goods train with BCNHL wagon as per RDSO’s sketch no. WD1-63/2006 ( annexure-I) on the 6(six) routes during this
. year as given below: -~
A S.No. | Railway Route
™ 1. SCR,SWR Manikgarh( along with sidings of MAGH-GDCR
A section)-KZT-SC-VKB-Wadi-GTL-GV-DMM-SBC
~ 2. SCR,CR MAGH(along with siding on MAGH-GDCR section-
> MMR-KYN
” 3. CR WD-DD-PA, KYN-NGSM including PA-Sasarvad
a road section
cm 4, SCR,SR,SWR Yeraguntala-Renugunta-JT)-SGWF
A 5, SCR,SR Yeraguntala~Renugunta-SO
6. SCR,SR MAGH-Warrangal-BZA-RU-including BZA-GDR-SO
~ However, such wagons are also subsequently proposed to run
universally. m~ It is therefore advised that:
~ a) Details of infringements to be removed including kinetic profile of the ~~ wagon may be obtained from RDSO.
b) Action may be taken for removai of infringements by the concerned
—~ railways and completed by 31.08.2008
A c) The extent of infringements removed along with the cost incurred for
“ removal of these infringements may be informed to Board. ~
oN ( T.Gupta ) C Executive Director Civil Engg.(G)
Railway Board.
A; ong sketch.
er Wye ard 7 r ay me mtey to -}i) Ex. Director (Track) RDSO, Manak Nagar,Lucknow-226011 in reference
oer seveeee al to above jetters and to advice the concerned zonal railways and KRCL
wt ‘ay faa regarding infringements to be removed. of fsrue « ii) EDME(Frt.) / Railway Board for:information.
fon [~
lon - 3 SS 7 ANNEXVRE ~Z an -
4
Ly
wey
© YATE:-04.01.2006
Pd pO
HR HR
EE ee
DIAGRAM NO. 1D-2004
1273
FL
HT.
FROM
RL.
N
2 a 2 es whe oe © eo ee 6 es ee
1676 GAUGE
2260 JOURNAL CENTRES
3355 OVER SOLE BARS
PROPOSED CROSS SECTION FOR BCNHL WAGON
MMD INFRINGEMENT— ~SIDE UP TO 4025mm. AND OVERALL
HT. UPTO 4385mm.
R.D.S.0. SKETCH NO.-W01-63/2006
727 FFIXIAIIX
FFXX
DD
DDI
DD DDDDIDIDDID
DD
4
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS
(RAILWAY BOARD)
No. 2003/CEDO/ORI/12, 7 New Delhi, dated \S.04.2008
The Chief Commissioner of Railway Safety, DRM NER Compound, Ashok Marg, Lucknow-226001,
Sub: Opening of New Double line between Brace Bridge and Akra stations on Sealdah-Budge Section of Sealdah Division of Eastern Railway for Public Carriage of Passengers.
Ref: {i) CRS’s (Eastern Circle) letter No. 608/1/B/03/75/H dated 28.04.03.
ebeee
With reference to CRS’s (Eastern Circle) endorsement No. 608/1/B/03/75/H dated 28.04.03, the approval of Ministry of Railways is hereby communicated to the recommendation of Commissioner of Railway Safety, Eastern Circle, Kolkata for opening of the above section for public carriage of passengers.
J 7
[/ . {T.Gupta) Executive Director Civil Engg.(G)
Railway Board.
No. 2003/CEDO/ORI/12. New Delhi, dated (S.04.2008
Copy forwarded for information to: (i) The Commissioner of Railway Safety, Eastern Circle, 14, Strand Road, 12th
Floor, Kolkata-700001, w.r.t. his letter No. 608/1/B/03/75/H dated 28.04.03.
{ii) The Chief Administrative Officer (Const.), Eastern Railway, Kolkata. (iii/The General Manager (Engg), Eastern Railway, Kolkata.
Uv 2,
( T.Gupta )
for Secretary, Railway Board.
Md
Gf Cy,
Aad BWA GOVERNMENT OF INDIA — et sales MINISTRY OF RAILWAYS (aa tS RAILWAY BOARD )
0. 2008/CEDO/ SD/03 New Delhi, dt .15.04.2008 The General Manager(Enggj, South Central Railway, Secunderabad-500 071.
Sub: Up- gradation of BG Chord line- Opening of track for Passenger traffic between Malkajgiri ‘B’ Cabin and Moula Ali ‘C’ Cabin in Hyderabad division of sc Rly- Condonation of infringing gradients.
Ref: Your office Letter No W.573/Y /Infringing Gradients/Mly-STPD chord line , dt. 29.02.2008.
Vide your letter referred above, Board’s Sanction was Sought for Condonation of infringing gradients for Up- gradation of BG Chord lLine- Opening of track for Passenger traffic between Malkajgiri ‘B’ Cabin and Moula Ali ‘C’ Cabin in Hyderabad division of South central Railway. However, while processing the proposal in the Board, Adv(Safetyjhas commented as given below: “While there is no objection to granting condonation as asked for, the station being essentially having standard I layout, conditions for granting line clear/direct reception & despatch from MJF, SNF and MLY side for each stream of traffic should be specifically defined which has not been done. SWR refers to Up & Dn lines only where as there are 3 directions relevant at this station in addition to R&D/Shed lines. Falling gradients immediately Preceding home signal from MJF and SNF is of consequences which do not seems to have been taken into account while imposing conditions. Railway should review and elaborate SWR’. , The reply of above comments may kindly be furnished to Board at the earliest to process the case further for considerations of Board.
, _
. (T. Gupta) [ Axecative Director, Civil Engg. (G)
Railway Board. No. 2008/CEDO/ SD/03 New Delhi, dt.15.04.2008 Copy forwarded for information to:- * Compound of DRM/NER, Ashok Marg, Lucknow -226001
-Phis endorsement No. Q.11014/02/2007-a0fm0 at. 20.03.08. -RES./South Central Circle, Sarojini Devi Road, Secunderabad-500 071
is letter No. wg 11018/02/2007 -SCC/959 dt .05.02.2008.
J 2
(T.Gupta) Me for Secretary, Railway Board.
a onad ataente GOVERNMENT OF INDIA ~~ Ge
- gs% \ eet Qa aalera MINISTRY OF RAILWAYS _
Aye L's | A (Jad Wrst RAILWAY BOARD ) | ay
Ae ~ No. 2008/CEDO/SR/02 New Delhi, dated 22 .04. 2008
a The General Manager(Engg},
- Central Railway, CST Mumbai. | a
a u
mm Sub: Running of Bogie Hopper Wagon type “BCBFG” for bulk
A transportation of food grains. Ref: Your office letter No. W.681/Y-122/BR,Dt:09.01.2008
om”
~ In reference to above letter, the sanction of the Ministry of Railways,
cas Railway Board is hereby communicated for Running of Bogie Hopper
Wagon type “BCBFG” for bulk transportation of food grains over
~ Central Railway subject to terms and conditions as given in RDSO’s
Provisional maximum permissible speed certificate and Central Railway’s
~ . Joint Safety Certificate, Track Certificate and other Certificates
o~ accompanying above referred letter.
~ The sanction is further subjected to the recommendations
/suggestions made by CCRS/LKO vide his letter No. wq,13011/03/2008-
on aofto dated 25.02.2008 and with Board’s comments as under:
mo (i) The movement of the wagon (whether empty or loaded) r
~ should be in lid locked down condition only.
~ 4 ‘ . . wo ‘ T 2
” 4 (T.Gupta) —
~ Executive Director Civil] Engg.(G)
“ Railway Board.
—_ . :
an No. 2008/CEDO/SR/02 New Delhi, dated 22 .04. 2008
~ Copy forwarded for information to:
~ 1. CCRS, Compound of DRM/NER, Ashok Marg, Lucknow -226001 w.r.t.
his endorsement No. #4. 13011/03/2008- aoftrs dated 25.02.2008
o 2. The Commissioner of Railway Safety, Central Circle, 2" Floor,
A Churchgate Stn. Bldg. Annexe, M.K. Road, Mumbai-400 020, w.r.t his
ne letter no. =14(424)/2008-50 dated 16.01.2008. .
- 3rThe-Execative Director Standards (Motive Power), RDSO, Lucknow, w.r.t. his
, letter. No: MIWICS/BTEKG, dt. 24.07.2007. oo THEN aot A .
, ganar! - aval J —~D
~ aye go eee (T.Gupta)
Pr oe “e \M i _...._for Secretary, Railway Board,
rm
mo a
~
D Leer Wa 2008 JE PDolsQtoy oj
Sul: (as ming &P 2m Me Alia nan Ole (goof of! IB-2S54 wee GD jeg
ORG FEB] SAIg Nem» Bethy 29,4, Wed
4 Garb Qh Vrain, syst, 2mhon teal Cybash, Cauca 2G | + EPs [Fart Dans — BI, 2Yb3- a |
G
~ Sefoe Ferrey of Ganb Roth Dradma ith Be Rane Cuprer yOu,
Arh |CLDO|sR]a New Odky ded oe. In, vay Gal + Keer >) (aril Bib Gap mth befrren AZ Mm - Cheavn wh PNZM — Rondon [r) Seehan af- [Bolkeoen CRIs
bay _ (ohn Popes! (Hf of “Ge nwnloe: Cys 4 (2+ ag
m7 | C& bo] SRf13. Ab KR. Oey Lib, din frreluch « +f AWD HP WDPY — loew ms,
[9 (wile QB’ Leth » Hf Soot Gob. Pole
Qe)
Ke
> >
> el
yo.)
=)
y
2 2D IDO
VIMY Yr
DD
YD DY
ea)
m™, A ; , ,
A ~ G F —~
nll, > Mad aan GOVERNMENT OF INDIA ~
«
7 Wes a valetal MINISTRY OF RAILWAYS
~ (Aor Br RAILWAY BOARD )
A No. 2008/CEDO/ SD/03 New Delhi, dt.23.04.2008
a™
a The General Manager(Engg),
. South Central Railway,
Secunderabad-500 071.
aN
~ Sub: Up- gradation of BG Chord line- Opening of track for Passenger
. traffic between Malkajgiri ‘B' Cabin and Moula-Ali ‘C' Cabin in
” Hyderabad division of SC Rly- Condonation of infringing gradients.
o~
~ Ref: Your office Letter No W.573/Y/Infringing Gradients/Mly-STPD
~ chord line , dt. 29.02.2008.
A With reference to your letter referred above, sent through the Chief |
~ Commissioner of Railway Safety, Lucknow, the sanction of Ministry of Railways,
. Railway Board is here by communicated for Condonation of Grade infringement to A
SOD Revised ,2004 in proposed Up- gradation of BG Chord line- Opening of
~ track for Passenger traffic between Malkajgiri ‘B' Cabin and Moula- Ali ‘C'
~ Cabin in Hyderabad division of SC Rly as shown in Form-XI( modified as Form -
° XVII) and Plan enclosed with above referred application.
a The sanction is further subject to the recommendations/suggestions made
ma by CRS/SC Circle/ Secunderabad and CCRS/LKO vide their letters No. ea 11018/02
~ /2007-SCC dt.05.02.2008 & No.aa.t1014/02/2007- aofto dated 20.03.2008
~ respectively and with Board's comments as under:
Oo 1. Amendments to para 6.2.1 of SWR of Maula-Ali Gate Cabin as proposed vide
~ CPIM/SCR letter no. T.411/Y/56 dt. 12.04.08 should be incorporated in SWR.
~ 2. SWR of Maula-Ali ‘C’ Cabin should be amended to include fol lowing:~
” “station Master shall ensure that once fine clear is granted to Maula-Ali
‘ate Cabin for goods train from SNF/AMQ side, the Up Home Signal No. 20 to
—"p
a A * ispatch a train to Maula-Ali Gate Cabin via Loop fine shalf not be taken
7 ‘Off’ unless the goods train for which fine clear has been granted has
rn
yO
&: . Cf
) IID
DD
ID DY
YY
yd)
DD)
tP THA)
) REY
HY
1)
DP
Dav
Oeyveyey
-2-
3. Limits of speed over non- isolated facing points of yards of Maula-Ali ‘C’ Cabin and Maula-Ali Gate Cabin should be restricted as per GR 4.11.
VV
( T.Gupta ) Executive Director Civil Engg.(G)
Railway Board.
No. 2008/CEDO/ SD/03 New Delhi, dt.23.04.2008
Copy forwarded for information to:-
1. The CCRS, Compound of DRM/NER, Ashok Marg, Lucknow -—-226001 w.r.t. his endorsement No. Q.11014/02/2007-a0fio dt. 20.03.08.
2. The C.R.S./South Central Circte, Sarojini Devi Road, Secunderabad-500 071 w.r.t. his letter No.a@e 11018/02/2007 -SCC dt .05.02.2008.
DO.
(T.Gupta) for Secretary, Railway Board.
fms
J)
5)
DAD
“yD
yd.
D3
sds)
QD a)
Yor OOD)
. caf / In SNe py
yar, (tara ate)
ag frRti-990 009
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
; (RAILWAY BOARD)
DEEPAK KRISHAN NEW DELHI-110001
ADDITIONAL MEMBER (CE)
D.O.NO. 2001/CEDO/SD/9 , New Delhi, dated 4.2008
Sh. My dear Pannu,
Sub:- Arsikere-Hasan-Mangalore gauge conversion project of S.W. Railway-
Provision of Catch Siding in Sakleshwar-Subramanya Road Ghat Section.
Ref:- (j) Board’s letter of even number dated 18.12.06, 5.7.07, 30.10.07 & 7.2.08.
(i) ED(TrafficyRDSO’s letter No. TFC/C.Siding dated 30.12.2007.
(ii) ED(Track)/RDSO’s letter No. CT/CS/SS dated 13/14.3.2008.
Vide Board’s letters referred at (i) above, RDSO was requested to make out
necessary changes in “The Railways Opening for Public Carriage of Passengers Rules,
2000"- FORM-XV- STATION WORKING — Question No. 46 — Note -2(copy enclosed at
Annexure-I) treating locos fitted with AEB devices at par with catch siding. This had the
in principal approval of Board (ME). °
Vide letter referred at (ii) above, RDSO had sent their technical recommendation
for revising the criteria for provision of catch siding, in the form of minutes of meeting
which did not serve the purpose. Also RDSO vide letter referred at (iii) above, has still
not done the needful.
f Since the changes in the rules have to be, put to the Board, Hon’ble MR, Ministry of
Law, Justice and Company Affairs and tabled in both Houses of Parliament, for
approval, therefore,the proposed changes along with the existing provisions shown in
juxta position are required to be made out and sent to the Board along with
recommendations of CCRS/Lucknow.
Incidentally, during the last Conference of. CCRS/CRSs with Board, this issue was
discussed vide Item 5 of the minutes (copy enclosed at Annexure-II).
Accordingly, RDSO is requested to kindly make out the proposal for the changes in
“The Railways Opening for Public Carriage of Passengers Rules, 2000” for further
processing in Board.
A bee Lehn
“ee \ LA DEEPAK KRISHAN)
DA: As above
Shri H.S.Pannu, Director General, RDSO,
Manak Nagar, Lucknow ual h siding-Sakleshwar-Subram
anya Road Ghat section.doc '
HAMy Documents\Vashisth RK\CRB Folder\Provision of cate’ “Liew y US
Thin sb 6} fare No. XT.
“ 7 102 THE GAZETTE OF INDIA : EXTRAORDINARY, [Parr Il—Sic. 34]
“ | a) “ (2) . | (3) a
“ STATION WORKING . me
o : ™ 44 Is provision made, whether by trap points or other a
~ h , means, to prevent, vehicles standing on sidings, a
~ ‘from fouling any running line? au
i 45. Are there any stations situated on 8 steeper grade ‘ a
~ ‘ than | in 4007 if 80, what special dafety devices wl
~~ : | are adopted and for special rules enfbreed at those wa
. Stations? * a
~ 446 © Whiat safety sidings are provided? } a
“Oy Are they suitable? @ = a
o Are any others necessary? | ee a
~ ‘Note: No statidn should be constructed nor a
- ‘should assy siding join a passenger line on a “=
o stceper gradient than | in 260, exe where it is ' . os
~ unavoidable, and then only with ‘the previous 7 S
_ sanction of the Railway Board obtained through os
se ; 5 the | Commissioner of Railway Safety, when a slip 3
2 “ yt siding or other arrangements is madd, sufficient to ; con
~ prevent accidents. a S
~ :@Nole 2: At any station situated in the immediate vac ‘ mi
> | neighbourhood of an incline steeper thoy § in 100 A al ged a
o \ falling away from the station, a catch siding in the , a ad
~ former case, and a slip siding. in the fatter case, ( Protre hae Gage a
- should be. provided, if necessary, in a suitable cade (VU B
om position. The take off points to a catch siding or a AEG y ae ©. . a
of slip siding should normally be sct and locked for : 9 pu 46) al
_ the siding, except where required to be trailed oa a
. through. : 8
™~ “For the purpose of the footnotes marked* | and 2 ;
ro the definition of a station yard as given iu item 2
eS ° Sermon neat eee ee esSameniee
~
=
on
Ann —t
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS
(RAILWAY BOARD)
No.2007 /Safety(A&R) i 1 /25 New Deihi, dt: 11.02.2008
= General Managers, ,
A All Indian Railways - Metro Railway, Kolkatta
~
~ Managing Director , oo Konkan Railway Corporation,
&™
- Director General,
. R.D.S.O., Lucknow
> Chief Commissioner of Railway Safety, _~ Commission of Railway Safety, ~ Lucknow-226 001. -~
” Sub: Minutes of the meeting of the Commission of Railway . rn , 7 Safety with Railway Board held on 03.12.2007.
ne . , ik
- The undersigned is directed to forward herewith a copy of
_ the minutes of the meeting between Railway. Board and
Be CCRS/CRSs held on 03.12.2007 at Rail Bhavan. ‘ This is for ~~ , information and necessary action please. )
~
~ @
q ; . ( Amitabi) ~ Encls: As above Director Safety-I . Railway Board
ape Leta : . — “ f~— Copy to:.
o~ AWteg ; ~ AM/TT,-AM/ME, AM/CE, AM/L, AM/Sig., AM/Tele.,
c AM/W, AM/C, Adv./Staff, Adv./Safety, ED/Chg.,“EDCE/G & ~ EDCE(B88).
o ME, ML, MS, MM, MT, FC, CRB - for information please.
eee eg ee
SF FR
DCD.
) 1D
0D
>)
‘)
‘yep
1 CS
fy)
8)
Qo
Dad
ep VP
TIED
ED
TD Dap
ED
CI TDD
i)
6)
8)
Minutes of the Meeting of the Commission of Railway Safety with
Railway Board held on 3° December, 2007.
4. At the outset CRB welcdmed the CCRS, CRS's from different circles and |
other officers of the. Commission. He lauded the role of the Commission
of Railway Safety in promoting safety on Indian Railways. He desired a
still better coordination between the CRSs and the respective Zonal
_ Railways so that planned works could be executed early. He also urged
that in case the commission feels that the proposal. submitted by railways
is workable but for the prevalent codal/Policy directives to the contrary it
can be sent to Railway Board directly for considering changes if any.
2. MT desired that progress of works has to match the growth in traffic. The
. Commission may like to review the system- of working for expeditious
clearance of railway proposals for traffic facility and through put
enhancement works. ME emphasized on the need of changed perceptive
in the light of heavy inputs gone into the system to strengthen
infrastructure and new technology initiatives.
3. CCRS stressed on the need for ensuring quality improvement in
construction, maintenance, inspection and training of staff to ensure
safety in the long run. He also stressed the need for adopting a flexible
approach to solve the issues amicably. with mutual consuitation. He
requested Board to consider helping the commission to overcome certain
administrative and personnel difficulties faced by the Commission as
formal sanctions may take long time.
' 4. Discussion in brief on the Agenda items of the Commission is as under:
4. Running of Triple Headed WDM2 Locomotives on various sections of
S.C. Railway: oe : So
Board instructed that triple headed WDM2 locomotives should run only after
RDSO’s section specific speed certificate has been obtained and special
conditions specified therein have been complied with by the Railway. CE
directorate may issue a clarification in case if it is not already done.
2. Running of Multi Locos:
Running of multi locos is necessitated by heavier iron ore trains. Fast
wearing components of the Rolling Stock are timely replaced by the
maintenance units so as not to compromise on safety. It was decided to
constitute a Standing Group of technical representatives from Railway Board
and one of the CCRS/CRS as may be nominated by CCRS for ongoing
dialogue on issues related to wear tear and stresses on rails and rolling stock,
design and impact of various technological inputs. The Committee should
D:\SANGEETA\Meeting with CCRS latest.dac Page 1 of 7
ee tee ae,
en
ne ce Rm
yey
cv
eY
«Py
1D
6D
> “yep
rd
aiy
t a)
cy)
TD
OY
) D
o)
cpap dD
CP)
eyez
sd
1)”
meet once in a quarter to discuss various issues relating to such matters. A
CCRS volunteered to be part of this Committee.
3. Lukewarm Action of the Conditions Stipulated by Railway Board for carrying CC+8+2 tonne load:
Board informed that the progress of compliance of items prescribed for carrying CC+8+2 tonne load in one of the standing agenda item of Board meeting. The installation of WILD in a time bound manner should be ensured and output reports of WILD should be accessible to the CCRS/CRS of the concerned circles.
4. Modernisation in the inspection methods in Mechanical Department for rolling stock: |
Concern expressed by CCRS was noted by Board. Provision of modern methods for inspection and maintenance of rolling stock is an on-going process and necessary action should be taken by the concerned directorates.
_--® Requirement of Catch Sidings in new lines to be opened:
Board informed that RDSO is examining this matter. The recommendations/suggestions made by RDSO would be appropriately considered in Board before final decision is taken in this matter. If need be assistance of the Standing group to deliberate on multiple loco operation may also be taken.
6. Mechanisation of Engineering Work and Restoration after Accident:
Concern expressed by CCRS/CRS was. appreciated by the Board. It was informed that assistance of locally available JCB/bulldozer etc. are being requisitioned as and when needed. Upgradation of machine/tool is however a continuous process. As of present inventory of available machine/tools can be compiled to assess the nature of equipment available on the ground. —
7. Works being Executed by RVNL:
During discussion it was decided that CE directorate will make available to the commission the MoU signed between the Ministry of Railways and RVNL stipulating appointment of a coordinating officer by the GM of the concerned railways who is to ensure the compliance of safety instructions and is also responsible for signing of CRSs papers etc. !t may also be studied if MoU is required to be more exhaustive to elaborate the procedures in case it is lacking in any manner.
D;\SANGEETA\Meeting with CCRS Latest.doc Page 2 of 7
PS TAK
yi?)
} a)
pry
y ey
ad ry
e)
1) a)
pts
ev ag)
Sy.)
2 09
C9
1D
1)
{y
4)
()
“aD
LV
LD
8. & 9. Improving Safety on Unmanned LCs on IR and Proposals for New
LCs on National Highways:
Action taken by railway administration to reduce vulnerability at the level
crossing gates was intimated to the Commission. About 150 unmanned LC
gates have been closed and proposals. for providing 800 limited use sub-ways
have been received in the Board’s office for-sanc ion.under the works .
programme 2008-09. The tempo of closing LCs having little traffic, merger of
LCs, provision of limited use sub-ways etc. need to be pursued rigorously as
being the only effective method of avoiding such accidents.
40. Track Structure in the Ghat Section having Steep Grades:
Concern expressed by Commission was noted, and it was agreed to look into
it afresh and whether the standard of track structure in the Ghat section
having steep grades have been embodied in the extant instructions and are
regularly followed, and if something more can be prescribed.to avoid early
wear & tear.
11. Standard of Construction during construction of New Lines:
It was highlighted by the Commission that implementation of guidelines
issued _ by Railway Board and RDSO is poor on Zonal Railways. CE
directorate may take up appropriately with the Zonal Railways.
12. Quality of Work during. construction of New Line:
CCRS stated that the RDSO should inspect the quality of earth work in new
lines as was. being doné-eaflier'as CRS do not have means to inspect or
‘check during construction. It. was however not agreed. ME. stated that the
lies with the executing
present practice of execution and quality control
authority, which is followed by inspection by the CRS before the line. is
opened for passenger traffic.
43. & 14. Legislation Required for Consulting Engineers and Provision
of Foot over bridge/subway at stations with island platforms:
Board desire CE directorate to look into the suggestions and provision of
under bridge as proposed by the Commission
15. Infringement of SOD(track centers)- Proposals for condonation:
ot be a routine matter and the
it was agreed that condonation of SOD should n y CE directorate.
same should be reiterated to the zonal railways b
Page 30f7
D:ASANGEETA\Meeting with CCRS latest.doc
‘’c>p
73
i)
ryt)
0}
3 ‘)
Ped
vd
oD KPI
ED Ga)
“yt?
yeyviyes
a)
pod
op dO)
OOD
yy
1)
46. Rebuilding/Construction of Bridges in Gauge Conversion Projects:
Board expressed that CRS clearance wherever stipulated under the rules
should be taken. This should be reiterated to railways by the CE directorate.
47. Quality of Steel Works for Bridges:
ME assured that related quality issues will be appropriately looked into and
training courses for officers and staff involved in such works will be organized.
CCRS stated that a list_of approved contractors for such works should be
drawn to obviate the indiscrimiriate inclusion of parties with poor credentials. -
18. False compliance of stipulations made while according
sanction/authorization before opening of sections:
Board desired to reiterate to the railways to. strictly comply with the
conditions/stipulations made by CRS while according sanction/authorizing
opening of sections.
49. Undue Pressure being subjected on the Commission for granting
sanctions:
Board desired that since delays are often caused due to poor documentation
submitted to the commission while seeking sanctions, CE directorate should
impress upon all the railways to prepare papers carefully and appropriately.
20. Quality Checks of Materials of S&T:
Instructions have already been issued by Signaling directorate in this regard.
21. Subsidiary Rule in some Railway’s GSRs for declaring terminal
yards:
Board desired that Railways should be judicious in defining the terminal
station under the purview of General and Subsidiary Rutes. No change in the
GR is however needed as suggested.
22. Manpower for New Assets:
Board advised that a Committee is working to review the manpower
. requirement of all the departments. Issues related with manpower will be
discussed after the examination of the recommendations of this commitiee.
Page 4 of 7
D:\SANGEETA\Meeting with CCRS latest.doc
>t)
1)
0)
4)
O74)
cpg
23. & 24, Expenditure of Commission of Safety by IR & Skill Upgradation of the officers of the Commission:
CCRS submitted that expenditure for upgradation of technicai skills of the officers of the Commission should be undertaken by the Ministry of Railways and Ministry of Urban Development (for metro projects) as the work done by the commission mainly falls within the purview of these ministries. CRB however assured to appropriately take up this matter with Secretary, Ministry of Civil Aviation as the commission falls under their jurisdiction and they should be making adequate provisions for the expenditure as is required for . this purpose.
25. & 26. Functioning & Performance: of the Commission & Strengthening of Commission of Raitway Safety:
Progress of filling up the vacant posts of CRS and Dy.CRSs were advised to the Commission. CCRS requested for some adhoc arrangements of manning of two posts of Dy. CRS(S&T) at Mumbai and Kolkata and one post of Dy.CRS(Mech.) at LKO. He suggested that Railway Officers from the respective cadre might be deputed to attend the office of CRS twice or thrice a week to clear the backlog of work. Board assured to instruct the concerned railways to assist in the manner suggested in view of large riumber of proposals being forwarded to the Commission for sanction.
27. Provision of Bungalow Peons to the officers of the Commission:
CRB suggested to postpone deliberations in this matter till the recommendations of VI" Pay Commission. , .
28. Non- receipt of Technical Orders, Circulars from Railway Board and RDSO: ro. ’ ps ar ,
All the Technical ‘Circulars and Orders are being forwarded to the office of CCRS as per present practice. Board agreed to send all circulars and orders by email to the individual CRSs for which the email addresses of respective CRS’s.may be sent to the Board's office.
29. CRB desired the Commission to send the detailed proposal regarding privilege Pass & PTOs for their non- railway personnel for examination in the Board’s office.
D:ASANGEETA\Meeting with CCRS latest.doc Page 5 of 7
ings cen
woe ny
ee age
ns ee
WD
PP)
asyads
yc)
a)
oa PyrS ees
td
ct} 7a)
ye
oad
i)
J) 9)
“YTD
ay
YON ODO
9 GD
5. Discussion in brief on the Agenda items of Railway Board was as
under:
1. Simplification of procedures:
1.1 After deliberations CCRS accepted the views of the Railway Board that
concerned THOD can sign all the pages of joint safety certificate and
PHOD can sign only the last page.
1.2.CCRS agreed that the copy of original sanction for any new rolling stock
sent by the Railways along with application for further running of that
rolling stock specifically on their system would suffice. -
1.3 (a) It was agreed by the Commission that the signatures of
Dy.CEE/Con. Working under CE/C would suffice for electrical
precautions in stage arrangement drawing. In case there is no
post of Dy. CEE/Con., Open line THOD of electrical department
should sign this.
(b) It was agreed. that GAD and staging drawing for ROBs will be
counter signed by CBE.
(c}) CCRS clarified that checkrails are necessary and should be
provided as they are required to prevent rolling stock hitting the
pillar of ROB in the event of derailment.
4.4 After detailed deliberations CCRS agreed that for major projects CE/C
can sign the completion drawing but GAD will be signed by CBE only in
terms of IRBM and forwarded along with opening documents.
1.5 After discussions it was decided that 5.3m of track center will not be
insisted upon in old yards/existing set up where space is a constraint.
This should be insisted only in case of new modifications.
1.6 It was agreed that ‘MBG 87 or joading standard. certification should ‘be
signed by CBE for open line works only.
1.7 It was decided that though the details of old infringements at th
unaffected locations will not be insisted upon, however, as a matter of
good practice, reference of old infringement should be given in the
drawings submitted by the Railway. ,
1.8 CCRS accepted the viewpoint of the Railway Board that modification
during the execution of mega block for gauge conversion projects will not
entail CRS sanction as no passenger train run during such blocks.
D:\SANGEETA\Mecting with CCRS Intest.doc Page 6 of 7
d Syarda
i).
re)
‘)
Pudi
er
ep
ad
yo
CVC
OD)
Og
yeV
sy
1d
Ser). Ys FOO
1.9 CCRS agreed to accept the view of the Railway Board to the extent that mention of the approval of State Government for shifting of LCs in opening documents was sufficient.
1.16 CCRS agreed with-the Railway Board’s view that BPAC can be later provided due to adrrinistrative compulsions for which separate
applicable will have to be made. -
1.11 CCRS agreed with the views of Railway.Board that conversion of MG crossing station to halt on BG shoutd not require a separate application, other than its mention in the opening document.
1.12 CCRS agreed with Railway Board that sanction of CRS was not required for changing gate leaves with lifting barriers.
2. CCRS agreed that work of panel interlocking should not be linked with upgradation of LC. gates. Separate. sanction for panel interlocking and upgradation of LC gates should be sought.
3. CCRS agreed for the regular interaction between the CRS and concemed Railway officials for free exchange of ideas. He informed
that check list has already been issued to facilitate better coordination of the Commission with the Railways.
4. After discussions, CCRS agreed with the Railway Board that as far as possible the preliminary narrative reports should adequately detail the exact nature of failure that has caused the accident.
5. AM/L requested CCRS to expedite the CRS sanction for running, 7 WAG 9 H locomotives on NR and SCR. -
OR
D:ASANGEETA\Meeting with CCRS latest.doc Page 7 of 7
DMD Oty
ed
oO ‘y
yey
Om pst)
iy ad
CPgy.yr
od
Syn)
) a
dVadongm
ear
(Duy
aR
1
OD
> }
ANNEXURE Present
1. Shri K.C. Jena, CRB
2. Shri V.N. Mathur, MT 3. Shri Satish K. Vij, ME
4. Shri R.K. Rao, MM 5. Dr. V. K. Ramteke, DG/RHS 6. Shri R. K. Mathur, Addl. DG/RPF
Shri Pranab Kumar Sen, CCRS
8. Shri Sudhir Kumar, CRS/Central Circle
Shri R. K. Kardham, CRS/Eastern and North Eastern
Circles
10. Shri Bhupinder Singh, CRS/Northern Circle 11. Shri kK. J. S. Naidu, CRS/Southern Circle
12. Shri Prashant Kumar, CRS / Western Circle
13, Shri Balbir Singh, CRS/South Eastern and Northeast
Frontier Circles
14. Shri R. P. Agarwal, CRS/South Central Circle
15. Shri Mathew John, Secretary/Railway Board ‘
16. Mohd. Irshad, AM/ME , 17. Shri Mahabir Parshad, AM/Signal 18. Shri S. P, Vatsa, AM/Works
19. Shri Sudesh Kumar, AM/L
20. Shri Girish Chandra, Adv. /Safety
21. Shri T. P. Gupta, EDCE(G)
22. Shri V. K. Govil, EDCE(B&S)
23. Shri Sanjay Kubba, Director/Safety-I.
24. Shri M.N. Ojha, Director/Safety-II
25. Shri Amitabh, Director / Safety-III
26. Shri Balak Ram, Joint Director / Safety
eens
—
oe an
ee
ve
Sad atacntae GOVERNMENT OF INDIA 4 [P- 7 2a diateta MINISTRY OF RAILWAYS
_ (3aqa Bs RAILWAY BOARD )
o No. 2008/CEDO/SR/05 New Delhi, dated 05.05.2008
~ The Director General/Track., oO RDSO, Manak Nagar, ” .
Lucknow-22601 1.
rn Sub: Condonation of infringements of Mobile Ultrasonic Rail ~ Inspection Vehicle SRS-241 (axle load 7.5 t) of M/s a Sperry Rail International Ltd.,U.K. ~ Ref: Your office letter No. CT/USFD/ Vehicular testing dt. 11-03-08
_ With reference to your application referred above, sent through the
~ CCRS, Lucknow, ‘the sanction of Ministry of Railways, Railway Board is
™. hereby communicated for condonation of the infringements to the clause
~ 2(ii),5 & 12 of Chapter IV-A, of B.G. Schedule of Dimensions
“~ Revised,2004 as per details shown in Annexure-I and drawings with your
a above mentioned letter.
a J 2
( T.Gupta ) Oo Executive Director Civil Engg.(G) ~ Railway Board.
L No. 2008/CEDO/SR/05 New Delhi, dated 05.05.2008
2 Copy forwarded for information to the Chief Commissioner of Railway ~ Safety ,compound of DRM/NER, Ashok Marg, Lucknow - 226001 w.r.t. his - endorsement No. @a.17013/05/2008- aoftto dated 28.04.2008.
ry
~ 2 A (T.Gupta) ~~ for Secretary, Railway Board.
o
Co
LS
”
gan dua che Oat en gereaneet
a a&t fata Pie of IsHUe sere corse saree
VOODOO
oO°0
‘ ’
— |
a
o™ Ce
Ov)
JI
fd IDE
9 )
22)
PP
YOM
) YOIOAMODV.IID
A
Sad aramre GOVERNMENT OF INDIA
2a diaiea MINISTRY OF RAILWAYS (Fas Ars RAILWAY BOARD )
No. 2008/CEDO/SR/03 New Delhi, dated 07.05.2008
The Director General/Track., RDSO, Manak Nagar, Lucknow-226011.
Sub: Infringement to SOD by Ballast Regulating Machine, Model PBR 400 R, supplied by M/s Plasser,India ,design condonation thereof. —
Ref: Your office letter No. CT/TMM/ GENL dt. 21.04.08 & 29.04.08
With reference to your application referred above, sent through the
CCRS, Lucknow, the sanction of Ministry of Railways, Railway Board is
hereby communicated for condonation of the infringements to the clause
2(ii),5 ,12,19(a) & 20(a) of Chapter IV-A, of B.G. Schedule of Dimensions
Revised,2004 as per details shown in Annexure-I and drawings with your
[- 20 — :
( T.Gupta )
Executive Director Civil Engg.(G) Railway Board. .”
above mentioned letter.
No. 2008/CEDO/SR/03 New Delhi, dated 07.05.2008
Copy forwarded for information to the Chief Commissioner of Railway
Safety ,compound of DRM/NER, Ashok Marg, Lucknow - 226001 w.r.t. his
endorsement No. #z,17013/07/08- aoftro dated 24.04.2008.
Jp
(T.Gupta)
for Secretary, Railway Board.
GlF Ls
[ >)
yaya
sy
oS
Ff)
1D
FIIWWIIIWIOI
OO ODIIID OVID
IA
glad alata GOVERNMENT OF INDIA
a diate. MINISTRY OF RAILWAYS
(ad BS RAILWAY BOARD )
No. 2008/CEDG/SR/07 New Delhi, dated 09.06.2008
The Director General/Track.,
RDSO, Manak Nagar,
Lucknow-226011. ©
Sub: Condonation of infringements of RG self propelled rail cum
road vehicle for ultrasonic rail inspection (Axle !oad 2.1t) of
M/s ABC Rail Road Products Pvt.Ltd., Lucknow.
Ref: Your office letter No. CT/USFD/ Vehicular testing dt. 11-03-08
With reference to your application referred above, sent through the
CCRS, Lucknow, the sanction of Ministry of Railways, Railway Board is
hereby communicated for condonation of the infringements to the clauses
2,7,9,10 & 31 of Chapter IV-A, of B.G. Schedule of Dimensions
Revised,2004 as per details shown in Annexure-I and drawings with your
above mentioned letter. .
to 2
( T.Gupta )
Executive Director Civil Engg.(G)
Railway Board.
No. 2008/CEDO/SR/07 New Delhi, dated 09.06.2008
Copy forwarded for information to the Chief Commissioner of Railway
Safety ,compound of DRM/NER, Ashok Marg, Lucknow - 226001 w.r.t. his
endorsement No. @,11015/03/2008- aoftre dated 12.05.2008.
uv 2
wv (T.Gupta)
\ew fbr Secretary, Railway Board.
POM.
YU.
IIO
‘>
4 fj
FOOD
JD VIMO).
7)
d i}
i>
a)
23
a
v GIF
grad alana GOVERNMENT OF INDIA
Dat dareral MINISTRY OF RAILWAYS
(Xa @rS RAILWAY BOARD )
No. 2008/CEDO/SR/07 New Delhi, dated 09.06.2008
The Director General/Track.,
RDSO, Manak Nagar,
Lucknow-226011.
Sub: Condonation of infringeménts of BG self propelled rail cum
road vehicle for ultrasonic rail inspection (Axie load 2.1t) of
M/s ABC Rail Road Products Pvt.Ltd., Lucknow.
Ref: Your office letter No. CT/USFD/ Vehicular testing dt. 11-03-08
With reference to your application referred above, sent through the
CCRS, Lucknow, the sanction of Ministry of Railways, Railway Board is
hereby communicated for condonation of the infringements to the clauses
2,7,9,10 & 31 of Chapter IV-A, of B.G. Schedule of Dimensions
Revised,2004 as per details shown in Annexure-I and drawings with your
J 2
cr dta )
above mentioned letter.
Executive Director Civil Engg.(G)
Railway Board.
No. 2008/CEDO/SR/07 New Delhi, dated 09.06.2008
Copy forwarded for information to the Chief Commissioner of Railway
Safety ,compound of DRM/NER, Ashok Marg, Lucknow - 226001 w.r.t. his
endorsement No. @24,11015/03/2008- oftro dated 12.05.2008.
J 2.
a (T.Gupta)
eX fbr Secretary, Railway Board.
ele
‘2 >
PV DV Vdd
DY
4d”
2)
Vroowg
) )
POU
DOOD
) 4
Saad Barer GOVERNMENT OF INDIA
Qe Bare MINISTRY OF RAILWAYS
(Xa AMS RAILWAY BOARD )
No. 2008/CEDO/SR/07 New Delhi, dated 09.06.2008
The Director General/Track.,
RDSO, Manak Nagar,
Lucknow-226011.
Sub: Condonation of infringements of BG self propelled rail cum
road vehicle for ultrasonic rail inspection (Axle load 2.1t) of
M/s ABC Rail Road Products Pvt.Ltd., Lucknow.
Ref: Your office letter No. CT/USFD/ Vehicular testing dt. 11-03-08
With reference to your application referred above, sent through the
CCRS, Lucknow, the sanction of Ministry of Railways, Railway Board is
hereby communicated for condonation of the infringements to the clauses
2,7,9,10 & 31 of Chapter IvV-A, of B.G. Schedule of Dimensions
Revised,2004 as per details shown in Annexure-I and drawings with your
Te a
( T.Gupta )
Executive Director Civil Engg.(G)
Railway Board.
above mentioned letter.
No. 2008/CEDO/SR/07 New Delhi, dated 09.06.2008
Copy forwarded for information to the Chief Commissioner of Railway
Safety ,compound of DRM/NER, Ashok Marg, Lucknow - 226001 w.r.t. his
endorsement No. @a4,11015/03/2008- <oftro dated 12.05.2008.
J 2
Lv (T.Gupta)
\ye ‘br Secretary, Railway Board.
oo)
“)
JDO
DD
F.WIDIOD IID),
Y
QTad Qlachla GOVERNMENT OF INDIA
Jat aigietalr MINISTRY OF RAILWAYS
(aa BS RAILWAY BOARD )
No. 2008/CEDO/ SD/01 New Delhi, dt. 11.06.2008
The General Manager(Engg).
Southern Railway, HQ. Office,
Chennai-600 003 1
Sub: Sanction for adopting lesser Track spacing and vertical clearance
at Read over Bridge no. 1136 in Tiruchchirappalli Jn. - proposed
Gauge Conversion between Tiruchchirappalli and Manamadurai
Jn. of Tiruchchirappalli Division of Southern Railway.
Your office Letter No W.573/T/33 Dated 11. 10.07, 6.5.08 &
CE/Con. SRly D.O. letter No. W.262/XXVI/1/CN dt.23.05.08.
With reference to your Ictter dated | 1.10.07 referred above, sent through
followed by clarifications
Railway Board
Ref:
the Chief Commissioner of Railway Salely, Lucknow,
dated 06.05.08 & 23.05.08 the sanction of Ministry of Railways,
Condonation for adopting lesser Track spacing
and vertical clearance at Road over Bridge no. 1136 in Tiruchehirappalli Jn.
th proposed Gauge Conversion between Tiruchchirappalli and
Division of Southern Railway as shown
bove referred application subject to the
is here by communicated for
in connection wi
Manamadurai Jn. of Tiruchchirappalli
in Form-XVII and Plan enclosed with a
conditions that:
(a) Movement of ODC on road 4 will be with ‘POWER OFF’ and a
speed restriction of 15 KMPH.
{b) Movement of ODC on road 1,2,5 8& 6 can be permitted with slewing
of OHE.
(c} Permanent bench- marking of rail level in the vicinity of ROB shall
be ensured. Jno
(Tr. Gupta)
Executive Director, Civil Engg. {G)
Railway Board.
No. 2008/CEDO/ SD/01 New Delhi, dt. 11.06.2008
Copy forwarded for. information to:
(i} CCRS, Compou nd of DRM/NER, Ashok Marg,
endorsement No. Q.1 1017/04 /2007 /TW dated 27-12-2007.
d, Gandhinagar, Bangalore-560 009
(ii) C.R.S./Southern Circle, 7, Seshadri oa
w.r.t. his letter 11017/1/2007-08 SR/1996 dt.27-11-2007.
Lucknow -226001 w.rt. his
TH OTA h, ary of Railwape ‘| :
, hak ale me
r(re-, fya (Tt. Gupta)
we fe for Secretary, Railway Board. Pen ad f vert
¢ ol Fe i: pire | o
~ Lt}
..
a)
kes
JA ed
“o
)
YD
FM
DD Dd
a .)
DIO
DID
OD
> OVINIDADIVO
ODO IVD)
9
‘. ae
V4
grad arate’ GOVERNMENT OF INDIA 3
dor ager MINISTRY OF RAILWAYS
(err @rs RAILWAY BOARD )
No. 2008/CEDO/SD/04. New Delhi, dated || .06.2008
The General Manager(Engg),
North Central Railway,
Subcdarganj, Allababad-211033.
Sub: Condonation for adopting existing steep gradient in Agra Fort
Yard between Chainage 489 to 218.95 in connection with Yard
Remodeling for the work Agra Fort — idgah Gauge Conversion
{Part of Agra Fort- Bandikuin Gauge Conversion Project) Agra
Division of North Central Railway .
Ref: Your office letter No. 254-W/2/1/AF-Idgah dt.05.03.2008
With reference to your letter referred above, sent through the Chief
Commissioner of Railway Safety, Lucknow, the sanction of Ministry of*
Railways, Railway Board is here by communicated for Condonation for
adopting existing steep gradient in Agra Fort Yard between Chainage 489
to 218.95 in connection with Yard Remodeling for the work Agra Fort -
Conversion (Part of Agra Fort- Bandikuin Gauge Conversion
Project) Agra Division of North Central Railway as shown in Form-XVII and
Plan enclosed with above referred application, subject to the conditions that:
(i) Sand hump has been provided at all the running lincs at Yamuna Bridge
side of the yard so that rolling down in block section is taken care of.
(ii) All the trains are received with setting of route toward sand hump.
(iii) -Run through train at this station is permitted at a restricted speed not
exceeding 15 KMPH .
Idgah Gauge
a a,
( T.Gupta )
Executive Director Civil Engg.(G)
Railway Board.
No. 2008/CEDO/SD/04. New Delbi, dated || .06.2008
rwarded for information to:-
of DRM/NER, Ashok Marg, Lucknow -226001 w.r.t.
2008—ao0fan dt. 8.05, 2008
2 The C.R.S , Noghht tern Cogit Tazyatganj, Lucknow-226001 w.r.t. letter
no. 3494/Partfp/SANG-222 dated 25/36-04-2008
Copy fo 1. The CCRS, Compound
his endorsement No. Q.11015/03/
(T.Guptaj
for Secretary, Railway Board
( y Ld
avy of Went Lo / ¢
dO
N u oe
+ 2 D2
po
PARVAMWIDIVIOIIDD
39D)
YD DDD IVD
ISY
Had Bache GOVERNMENT OF INDIA Rat sisict MINISTRY OF RAILWAYS
(Jao Wes RAILWAY BOARD )
No. 2008/CEDO/ SR/04 New Delhi, dt .11.6. 2008
Executive Director Stds. Track RDSO, Manak Nagar,
Lucknow.
Sub: Condonation of infringements for modified container flat bi-level auto car carrier wagon.
Ref: RDSO’s Letter No CT/Contr/BG/MG Dated 11.03.2008.
Vide your letter referred above, Board’s Condonation has been
sought for infringements of modified container flat bi-level auto car carrier wagon to SOD, Revised 2004 . However, while processing the proposal for Board’s approval, Board (ML) has passed the following remarks:
“ In future all such letters must come with the concurrence
of TI directorate . In this case also Ti directorate RDSO’s view be
obtained”
In view of above RDSO is requested to send the case with the
concurrence of TI directorate so that same can be processed further.
' t
2
(T. Gupta) Executive Director, Civil Engg. (G)
Railway Board.
No. 2008/CEDO/ SR/04 New Delhi, dt..11.6. 2008
Copy forwarded for information to: CCRS, Compound of DRM/NER, Ashok Marg, Lucknow —226001 w.r.t.
his endorsement No. #q,17012/03/ 2008- aoftts dated 22.04.2008
2 TATE ee P vatlt9t (T.Gupta)
for Secretary, Railway Board.
/. i
A
tN
a
A
~
~~
mo
oN
os
an
oN
cf
ron
cn
a
cw N
a
oN
A
rN
ma
mo
mo
oN
cm
~
N
my
Nn
“A
~
Y
gna atacnrer GOVERNMENT OF INDIA Yor visita MINISTRY OF RAILWAYS
(aor BTS RAILWAY BOARD )
a Sy,
No. 2008/CEDO/SR/16 New Delhi, dated 11.06.2008
The Director General/Track.,
RDSO, Manak Nagar,
Lucknow-226011.
Sub: Condonation of infringement to BG Schedule of Dimensions,
Revised,2004 of Mobile Bridge Inspection Unit(MBIU) stock,
manufactured by RCF, Kapurthala.
Ref: Your office letter No. CT/DHS/ Coaches dt. 19.02.2008
With reference to your application referred above, sent through the
CCRS, Lucknow, the sanction of Ministry of Railways, Railway Board is
hereby communicated for condonation of the infringements to the clause
5 of Chapter IV-A, of B.G. Schedule of Dimensions Revised,2004 as per
details shown in Annexure-I and drawings enclosed with your above
mentioned letter.
Qi ( T.Gupta )
Executive Director Civil Engg.(G) Railway Board.
No. 2008/CEDO/SR/16 New Delhi, dated 11.06.2008
Copy forwarded for information to the Chief Commissioner of Railway
Safety ,compound of DRM/NER, Ashok Marg, Lucknow — 226001 w.r.t. his
endorsement No. #a,17012/02/2008- aoftte dated 28.02.2008. memenppnaes sab his ey ) Qa
Tv ct 4
7 or taitmoys (T.Gupta)
xe id for Secretary, Railway Board.
~
nC
~
A
“as
“Y
—~
“-
mo
nm
7 VRPDVDIXDDV DDD
YD )
) /
YRA AHR GOVERNMENT OF INDIA ol ASIA MINISTRY OF RAILWAYS
( tea 41S RAILWAY BOARD) -
No. 2008/ CEDO / SD /05 eo New Delhi, dt. (3 . 06.2008
The General Manager (Engg). Southern Railway, HQ. Office,
Chennai-600003
Sub: Opening of Railways - Gauge conversion between Tiruchchirappalli - Karaikkudi- Manamadurai section (from Km. 494.140 to 556.258) of Southern Railway— Condonation for Retention of 110KV OH Power Line Crossing.
Ref. : Your letter No. W573/U/212 Dt. 28-05-2008. ee oe ok oe
Vide your letter referred above, Board’s Condonation has been sought for Retention of 110 KV OH Power Line Crossing at two locations i.e. at Km. 526/2-3 and Km. 551/3-4 with lesser vertical clearances of 12950mm & 12850mm respectively regarding Opening of Railways - Gauge Conversion between Tiruchchirappalli-Karaikkudi-Manamadurai section (from Km. 494.140 to 556.258) to SOD Revised, 2004. However, while processing the proposal for Board’s approval, Board (ML & ME) have approved the following remarks:
“ The schedule of dimensions of SOD Revised, 2004 (Page?) draws upon the clearances stipulated in and as appearing in the ACTM Volume-II Ptll issued by Ministry of
Railways in 1994 (Clause 17.3). These clearances have since been superceded vide AC slip
No, 16, for the clauses 17.3 and 21.1, Wherever specific provisions exist in codes and manuals for providing relaxations,
indicating the authorities competent to grant such relaxations, condonation from the Board is not necessary. In the instant case, provisions contained in the ACIM with the
correction slips may be availed of by the Railway without referring to the Boar
’ In view of above Railway may take further necessary action accordingly
Pear (V. K. Govil)
Executive Director, Civil Engineering (G) Railway Board.
No. 2008/CEDO/SD/05 - New Delhi,'3. 06.2008
Copy forwarded for information to: @ CCRS, compound of DRM/NER, Ashok Marg, Lucknow-226001 w.r.t. his
endorsement No. Q11017/04/2008-TW dated 30.05.08.
(ii) | C.R.S./Southern Circle, 7, Seshadri Road, Gandhinagar, Bangalore-560009
w.r.t. his letter No, Q.11017/1/2008-09/SR/353 dt. 29.05.08.
[eA
(V. K. Govil) for Secretary, Railway Board
OF
cs
oN
oo
ry
J J
9D
D>)"
) 2°)
D2 2°99 'D FD
DD DDD
DF
FD)
a,
} wv OU.
Hiekd alachia GOVERNMENT OF INDIA
Jat siarctey MINISTRY OF RAILWAYS (aw BS RAILWAY BOARD )
No. 2008/CEDO/ SD/06 New Dethi, dt. \> .06.2008
The General Manager(Engg). Southern Railway, HQ. Office, Chennai-600 003
Sub: Gauge Conversion. between Tirunelveli and Tiruchendur- (from Km. 1.613 to 61.567} of Southern Railway -Condonation for Vertical Clearance of 110 KV OH Power Line Crossing at Railway Km.50/2-3.
Ref: Your office Letter No E.572/CN/HQ/TECH/MDU-22 Dt. 16.05.08
Vide your letter referred above, Board’s Condonation has been sought for Vertical Clearance of 110 KV OH Power Line Crossing at Railway Km. 50/2-3 with lesser vertical clearance of 11564 mm_ as against of 14600 mm _ regarding Gauge Conversion between Tirunelveli and Tiruchendur - (from Km. 1.613 to 61.567 ) to SOD Revised ,2004 . However, while processing the proposal for Board’s approval, Board (ML & ME) have approved the following remarks:
“ The schedule of dimensions of SOD Revised, 2004 (page7) draws upon the clearances stipulated in and as appearing in the ACTM volume-If Pt. issued by
Ministry of railways in 1994(Clause17.3). These clearances have since been
superceded vide AC slip No. 16, for the clauses 17.3 and 21.1. Wherever specific provisions exist in codes and manuals for providing
relaxations, indicating the authorities competent to grant such relaxations,
condonation from the Board is not necessary. In the instant case, sanction of EIG
for retention of 110 KV electricity power line crossing was obtained on 18.03.03
Le. before the revised SOD came into force. This is a non-electrified area where the
minimum specified clearance is 11.76m as against 11.564m obtqined now and the
EIG’s sanction of 2003 is valid. Removal of the infringement has already been
planned. The case, does not , therefore, require condonation from Board.”
In view of above Railway may take further necessary action accordingly.
Poa
(V.K.Govil) Executive Director, Civil Engg. (G)
Railway Board.
No. 2008/CEDO/ SD/06 New Delhi, dt. ‘> .06.2008 Copy forwarded for information to:
(i) CCRS, Compound of DRM/NER, Ashok Marg, Lucknow -226001 w.r.t. his
endorsement No..Q.11017/04/2008-TW dated 30.05.2008.
(ii) C.R.S./Southern Circle, 7, Seshadri Road, Gandhinagar, Bangalore-560 009
w.r.t. his letter No.Q.11017/1/2008/SR/290 dt.20.05.2008.
—_
Pam
(V.K.Govil] “~~ for Secretary, Railway Board.
\ M
PI9ID
D997
DD
DD
9 ry“)
‘PF DD
GD
: Ne. 2008/CEDO/SR/08
“ v DLE Maa WAM GOVERNMENT OF INDIA > 5%) IA sre MINISTRY OF RAILWAYS :
(2aW Bs RAILWAY BOARD )
\
Ne. 2008/CEDO/SR/08 New Delhi, dated 16 .06. 2008
The General Manager(Engq) North Centrat Railway, Allahabad.
Sub: Sanction for Provisional Gperation of Dynamic Track Stabilizer Mode! DSP-C8T for stabilization of track supplied by M/s Metex- JSC, Moscow for ail the BG sections of North Central Railway.
Ref:Your office letter No.355-W/CRS/Dynamic Track Stabilizer/All BG/ NCR/TM, dt. 14.03.2008 .
In reference to above letter, the sanction of the Ministry of Railways, Railway Board is hereby communicated for Provisional Operation of Dynamic Track Stabilizer Model DSP-C8T for Stabilization of track supplied by Niiz Metex-JSC, Moscow for ali the BG sections of North Centra! Railway subject to terms and conditions as given in RDSO‘s Provisional speed certificates and North Central Railway's Joint Safety Certificate, Track Certificate and other Certificates accompanying above referred letter.
i bene
( T.Gupta ) Executive Director Civil Engg.(G)
Ratiway Board.
New Peli, dated 16 .06. 2008
Copy forwarded for information to: - 1. The Chief Commissioner of Railway Safety, compound of DRM/NER,
Ashok Marg, Lucknow - 226001 wart. his endorsement No. @q.11012/01/2008- aofto dated 21.05.2008
2. The Commissioner of Railway Safety, Worth Eastern Circle, Hazratganj,Lucknow-226001 w.r.t. his endarsement No. 3499/ Dynamic Track Stabilizer/NCR/295, Dt. 10/12-05-2008.
3. The Executive Director Standards (Motive Power}, ROSO, Lucknow, w.r.t. his letter No. TM/HM/11/21/DTS/Metex, dt. 07.11.2007
ofl. Wd (7.Gupta)
for Secretary, Railway Board.
nite Tee y : St a!
2 md ., A Poard
‘ “ \s selosura
Rea Baise wih ie Pe Vy pats Sot bot ee Be
Le
ag oe
Nis - ~ or Mad BWaaite GOVERNMENT OF INDIA Ae)
NY 2a sae MINISTRY OF RAILWAYS ‘ A (aA BS RAILWAY BOARD ) a
~
~ No. 2007/CEDO/SD/0. New Dethi, dated 17.06.2008
“s :
The Executive Director (Track) os RDSO,Manak Nagar
Lucknow. oN
A - Sub: IR Schedule of Dimensions 1676 mm Gauge(BG) Revised,2004 om,
PR
~
° South Western Railway vide their letter No. WE/CN/77/PLX/GENL dated -_,
: 23.05.2008 ( copy enclosed) have brought out that for 66 KV power line crossing ” the vertical clearance as given in ACTM is different from the stipulation of IR . SOD, BG Revised,2004.It has also been brought out that the ACS No. 16 ° dt.18.09.2006 to Railways Manual of ACTM Vol. II Pt.I Appendix IV,1994, o stipulates lesser vertical clearances than that contained in item No. 11 of SOD ~ Revised,2004, Accordingly the Rly has also requested to issue CS to SOD, mN Revised,2004. .
of You may therefore examine the same and send the case to Board with ~ your comments/recommendations for further necessary action .
on
o oo Encl: As above. 0 fe : ~ ( T.Gupta }
~ Executive Director Civil Engg.(G) - Railway Board.
om Copy to :-
~ i) CAO/CN/BNC, South Western Railway: Bangalore w.r.t. his note no. a WE/CN/77/PLX/GENL dated 23.0
~
at
~
2X
VX
Yad
) yD
ty veda
PP
DAV DD
VO JD
() yey
PP
AD
CP
TZ
LD
vB
3
SOUTH WESTERN RAILWAY
No. WE/CN/77/1V/PLX/GENL Office of the CAO/CN/BNC Dt: 23-5-2008 Additional Member (Civil Engg.),
Railway Board, Rail Bhavan, NEW DELHI — [10 001.
Sub: Clarification regarding clearance between lowest conductor and rail level as given in SOD 2004.
Ref: 1) Chapter-I Section-Ii (i) of SOD 2004. 2) Correction slip No.16 dt, Sept. 2006 to Railway Manual of AC traction (ACTM) Vol.If part If, Appendix [V 1994. - 3) This office letter of even number dated 17-5-2008.
“K2X-X-
In various proposals submitted as part of Opening Documents to the Commissioner of Railway Safety, he has been insisting to ensure the Minimum clearances of power line crossings as provided in item 11 of SOD 2004, which are much higher than the dimensions as per Correction slip t-ACTM as.-given in Ref (2) above. Though the correction slip has authorized reduced clearances, the same has not been effected in SOD 2004, by 4 correction slip to the same. In the absence of Correction slip to SOD 2004, CRS is not accepting the lower clearances as provided in ACTM. In several ‘sections clearances are available only as per ACTM correction slip No.16 and not as per SOD 2004.
In section Hospet-Tormagaillu at Km.147/0, one 66 KV power line crossing exists with vertical clearance which satisfy ACTM but not SOD. The vertical clearance of bottom most conductor with respect to the rail level is 12.9 m compared to the minimum of 11.16 mas iven Railway Safety, Bangalore has not accepted the same. It is therefore requested that a correction slip to SOD 2004 may be issued in conformity with the correction slip to ACTM early.
1) Additional Member (Electrical), }
)
caoren we
Railway Board, Rail Bhavan, New Delhi ) For information and necessary action please.
) 2) Additional Member/( Works ) Railway Board, . )
) )
_ Copy to:
New Delhi
3) Executive Director(Works) ) Railway Board, New Delhi.
° NE < GF - AVE \ : owe NG aad ATawHTae GOVERNMENT OF INDIA (@
Wa sacral MINISTRY OF RAILWAYS
” (Fae ws RAILWAY BOARD ) o™
” No. 2008/CEDO/SR/ 17 New Delhi, dated 23.06.2008 an
~ The Director General/Track., se RDSO, Manak Nagar, ™ Lucknow-226011. A
~ Sub: Condonation of infringements for LHB Coaches with ICF bogie - fitted with air springs at secondary stage suspension to BG a Schedule of Dimensions Revised,2004. ~ Ref: Your office letter No. CT/DHS/ 3/Coaches dt. 20.02.2008 rs
peeas.
a With reference to your application referred above, sent through the : CCRS, Lucknow, the sanction of Ministry of Railways, Railway Board is “ms
Se hereby communicated for condonation of the infringements to the clauses mn 19(b) & 20(b) of Chapter IV-A, of B.G. Schedule of Dimensions ~ Revised,2004 as per details shown in Annexure-I and drawings enclosed ~ with your above mentioned letter. o , J ae
~ upta } Oo / Preuutive bean Civil Engg.(G) A Railway Board.
co No. 2008/CEDO/SR/17 New Delhi, dated 23.06.2008
Cc Copy forwarded for information to the Chief Commissioner of Railway os Safety ,compound of DRM/NER, Ashok Marg, Lucknow — 226001 w.r.t. his ~ endorsement No. @q,.17012/04/2008- aoftro dated 29.02.2008.
° oe ~ (T.Gupta) an for Secretary, Railway Board.
>
~
eet ce ue ame 1
CoDncumenra ond Seming Adin isicrs viet apiNOR -€ cases later doe a
3 1)
An _ ataytnray GOVERNMENT OF INDIA
aareral MINISTRY OF RAILWAYS
- er (Ferd wire RAILWAY BOARD ) 4
C ZN 2008/ : > ~ No. CEDO/SR a /SR/18 New Delhi, dated 24.06.2008 I
7 The Director General/Track., [.
Ke! RDSO, Manak Nagar,
an Lucknow-226011. |
a ’ Sub: Condonation of movement of Doubl a
. j e Stack Container of
~ 2591mm(8*%2 } high on existing BG fow platform bogle
a container flat wagon type BLCAM/BLCBM on Mundra Port / .
Kandla Port-Samakhiali-Palanpur route. |
~,
a 1
a Ref: Your office letter No.CT/CONTR/ BG/MG dt. 05.03.2008 | }
a ns
o With reference to your application referred above, sent through the
~ CCRS, Lucknow, the sanction of Ministry of Railways, Railway Board is
~ hereby communicated for condonation of the infringements to the clauses
A 2(il),11, 14,29 & 30 of Chapter IV-A, of B.G. Schedule of Dimensions
: Revised,2004 as per details shown in Annexure-I and drawings enclosed
2 with your above mentioned letter.
7 ype
~ ( T.Gupta )
~ Executive Director Civil Engg.(G)
° Railway Board. |
A |
~ No. 2008/CEDO/SR/18 New Delhi, dated 24.06.2008
~ Copy forwarded for information to the Chief Commissioner of Railway
~ Safety ,compound of DRM/NER, Ashok Marg, Lucknow - 226001 w.r.t. his
~ endorsement No. a,17011/1/2005- aoftro dated 21.05.5008. :
~
|
- Mor eee
~ (7.Gupta) Board.
for Secretary, Railway
\ A
I. i
DodeR
Awd
GD
9D 92d
1d
LD
DQIO DODD
age WITT BIA GOVERNMENT OF INDIA
CT arama ey pnertntane ti Em SI RR Leeder 2 7 ote Aaa aio om, shal
vs 9 aa Baer MINISTRY OF RAILWAYS Xt (za VE RAILWAY BOARD )
No. 2008/CEDO/SR/19 New Dethi, dated 24.06.2008
The Director General/Track., RDSO, Manak Nagar,
| Lucknow-226011. |
Sub: Condonation of movement of Double Stack Container of 2591mm(8¥2‘) high on existing BG low platform! bogie: — container flat wagon type BLCAM/BLCBM on Jaipur- Pipavav route.
terns :
With reference to your application referred above, sent through the CCRS, Lucknow, the sanction of Ministry of Railways, Railway Board is hereby communicated for condonation of the infringements to the clauses 2(ii),11, 14,29 & 30 of Chapter IV-A, of B.G. Schedule of Dimensions Revised,2004 as per details shown in Annexure-I and drawings enclosed with your above mentioned letter.
| aan a! 4 (7T.Gupta)
Aj Executive Director Civil Engg.(G) 7c Railway Board. —
No. 2008/CEDO/SR/19 New Delhi, dated 24.06.2008
Copy forwarded for information to the Chief Commissioner of Railway
Safety ,compound of DRM/NER, Ashok Marg, Lucknow - 226001 w.r.t, his
endorsement No. wq.17011/1/2005- aoftro dated 21.05.5008.
apt 2 {
(T.Gupta} for Secretary, Railway Board.
i
|
me
yay
Ss O39
SFP
EP IPIDIYD DD
DIY DIO DDD
Py)
‘de>
4)
Ld
ome Gl
Se “BUTT GOVERNMENT OF INDIA (63) Ror sister: MINISTRY OF RAILWAYS
(FAA Bs RAILWAY BOARD ) No. 2008/CEDO/ SR/06 New Delhi, dt. 01.7. 2008 The Director General / Motive Power RDSO, Manak Nagar Lucknow 7
Sub: Final Speed Certificate for maximum permissible Speed of 22.32t (CC+6+2) axle lead Broad gauge Bogie Open Wagon type BOXNM1. Ref: (i) RDSO's Letter No MW/SPD/BG/BOXNM1/22.32t(R) dt. 31.10.2007 (i)GM(Engg)NCR's letter No. 355-W/CRS/BOXNM] (CC+6T+27) / All BG/NCR/TM dt.07.04.2008
Vide NCR’s letter referred at (ii) above, Board’s Sanction has been sought for regular operation of “Broad Gauge Bogie Wagon Type BOXNM1” ( CC+6T+2T) having maximum axle load of 22.32t for all the BG sections of North Central Railway based on the Final Speed Certificate issued vide RDSO’s letter referred at (i) above. However, while considering the proposal, Board (ML,MT,MM & ME) have observed as follows:
Satisfactory Test Speed (As in Speed_ Certificate) Safe Speed processed Loaded Empty Loaded Empty
80 80 60 80
“ Carrying capacities of the wagons have been enhanced by 8 tonnes i.e. by about 14 %, Operating the higher pay load at lower speeds could more than nullify advantages. Section capacities will reduce due to slower freight trains and increased speed differential with coaching trains, There appears to be scope for upward revision in certification of safe speeds,”
In view of above the RDSO. is requested to send their comments regarding _ upward revision in certification of safe speeds.
2
(T. Gupta) Executive Director, Civil Engg. (G)
: Railway Board. No. 2008/CEDO/ SR/06 New Delhi, dt. 01.7. 2008 Copy forwarded for information to:
’ CCRS, Compound of DRM/NER, Ashok Marg, Lucknow -226001 w.r.t. his endorsement No. #4,17012/03/2008- cofto dated 22.04.2008
J UL
(T.Gupta) for Secretary, Railway Board.
Copy to: The General Manager(Engg)North Central Railway, Allahabad. w.r.t his letter No. 355-W/CRS/BOXNM If (CC+6T¥27) / All BG/NCR/TM dt.07.04.2008, for information. oe 3 ‘CoDacimenta and SottingaAdmialetmm\DeektopiNcR -f enses letter dos
Yor
WO
DVI
Pry yay Ov
yoy
s %
NA Bary GOVERNMENT OF INDIA G | F y. as . Y Wa sare MINISTRY OF RAILWAYS Me xt (Fe We RAILWAY BOARD ) GY 08/CEDO/ SR/15 New Delhi, dt. 15.7. 2008
The Director General/Motive Power __ _ RDSO, Manak Nagar Lucknow
ow +
Sub: Final Speed Certificate for maximum permissible Speed of 22.32t (CC+6+2) axle load Broad Gauge Bogie Covered Wagon type BCNA. Ref; (i) RDSO’s Letter No MW/SPD/BG/BCNA/22.32t(IR) dt. 22.11.2007 (i) M(Engg)NCR’s letter No. 355-W/CRS/BCNM1 (CC+6T+2T) / All BG/NCR/TM dt.04.03.2008
Vide NCR's letter referred at (ii) above, Board’s Sanction has been sought for regular operation of “Broad Gauge Bogie Covered Wagon type BCNA” ( CC+6T+2T) having maximum axle load of 22.32t for all the BG sections of North Central Railway based on the Final Speed Certificate issued vide RDSO’s letter referred at (i) above. However, while considering the proposal, Board {ML,MT,MM & ME) have observed as follows:
Satisfactory Test Speed (As in Speed Certificate) Safe Speed processed Loaded Empty Loaded Empty
100 80 60 80
“ Carrying capacities of the wagons have been enhanced by 8 tonnes ie. by about 14 %. Operating the higher pay toad at. lower speeds could more than nullify advantages. Section capacities will reduce due to Slower freight trains and increased speed differential with coaching trains.
. There appears to be Scope for upward revision in certification of safe speeds.”
In view of above the RDSO is requested to send their comments regarding upward revision in certification of safe speeds.
ud es
(T. Gupta) ¢_~ Executive Director, Civil Engg. (G)
Railway Board. -No..2008/CEDO/ SR/15..- - +... New Delhi, dt. 15.7. 2008 Copy forwarded for information to: CCRS, Compound of DRM/NER, Ashok Marg, Lucknow -226001 w.r.t. his endorsement No. 7q,12011/04/2008- aofto dated 12.05.2008
J nn
(T.Gupta)} for Secretary, Railway Board.
Copy to: The General Mb een Es x entral Railway, Allahabad. w.r.t his letter No.355-W/CRS/HCNA (CC#6T #31) / All BG/NER/TM-dt-04:03;2008—— : . af , for information. AL
Btgi
Bignatus
PAUP
TD
CD PPD IY YD
Do)
1d)
t) |
PIV
IAD DPQ
FD PYM.
Oe
YD
ASAI HDD
YD
i 3
YOY
VAP OY}
vide 92)
4)
gmaa aracnry GOVERNMENT OF INDIA AE Qa aaletal MINISTRY OF RAILWAYS &
~ (3aa BS RAILWAY BOARD ) No. 2008/CEDO/ SR/ 14 New Delhi, dt. 15.7. 2008
: The_Director.General/Motive_Power. ee RDSO, Manak Nagar
Lucknow i
Sub: Final Speed Certificate for maximum permissible Speed of 22.32t (CC+6+2) axle load Broad Gauge Bogie Covered Wagon type BCNAM1
Ref: (i) RDSO’s Letter No MW/SPD/BG/BCNAM1/22.32t(IR) dt. 22.11.2007 (ii) GM(Engg)NCR’s letter No. 355-W/CRS/BCNAM1 (CC+6T+27) / All
BG/NCR/TM dt.07-14.03.2008
Vide NCR’s letter referred at (ii) above, Board’s Sanction has been sought for regular operation of “Broad Gauge Bogie Covered Wagon type BCNAM1” ( CC+6T+2T) having maximum axle load of 22.32t for all the BG sections of North Central Railway based on the Final Speed Certificate issued vide RDSO’s letter referred at (i) above. However, while considering the proposal, Board (ML,MT,MM & ME) have observed as follows:
Satisfactory Test Speed (As in Speed Certificate) Safe Speed processed Loaded Empty Loaded Empty
95 95 60 80
“ Carrying capacities of the wagons have been enhanced by 8 tonnes ie. by about 14 %. Operating the higher pay load.at lower_speeds could more than nullify advantages. Section capacities will reduce due to slower freight trains and increased speed differential with coaching trains.
There appears to be scope for upward revision in certification of safe speeds.” : .
In view of above the. RDSO is requested to send their comments regarding upward revision in certification of safe speeds.
of
6) (T. Gupta} / Executive Director, Civil Engg. (G)
Railway Board. No.-2008/CEDO/-SR/14—---- -- .- (.. ..- -New Delhi, dt. 15.7. 2008 Copy forwarded for information to: CCRS, Compound of DRM/NER, Ashok Marg, Lucknow -226001 w.r.t. his
_ endorsement No. #y,.12011/04/2008- aoftro dated 12.05.2008
J Se
(T.Gupta) for Secretary, Railway Board.
ay, Allahabad. w.r.t his
(CR/TM dt.07-14.03:2008
Copy to: The General Manage
letter No. 355-W/CRS/BCNA
, for information. ‘CeDacumenta ond Settings Admniai german DedtopivcR -§ cases fetter toc,
H (Cane FT Ay Ba 7)
Gf iF Mad ataxcHry GOVERNMENT OF INDIA _ tl. - Ye Yor sisiera MINISTRY OF RAILWAYS Cb ne N\A Ak (Ta BS RAILWAY BOARD )
008/CEDO/ SR/13 New Delhi, dt. 15.7. 2008 rn
A ‘The Director General/ Motive Power-- Tn seemte ees ‘= RDSO, Manak Nagar o Lucknow aa
™ Sub: Final Speed Certificate for maximum permissible Speed of 22.32t A (CC+6+2) axle load Broad Gauge Bogie Covered Wagon type BCNM1.
Ref: (i) RDSO’s Letter No MW/SPD/BG/BCNM1/22.32t(IR) dt. 22.11.2007 (ii) GM(Engg)NCR’s letter No. 355-W/CRS/BCNM1 (CC+6T+2T) / All
BG/NCR/TM dt.03.03.2008
Vide NCR's letter referred at (ii} above, Board’s Sanction has been sought for regular operation of “Broad Gauge Bogie Covered Wagon type BCNM1” ( CC+6T+2T) having maximum axle load of 22.32t for all the BG sections of North Central Railway based on the Final Speed Certificate issued vide RDSO’s letter referred at (i) above. However, while considering the proposal, Board (ML,MT,MM & ME) have observed as follows:
Satisfactory Test Speed (As in Speed Certificate) Safe Speed processed Loaded Empty Loaded Empty
100 90 60 80
“ Carrying capacities of the wagons have been enhanced by 8 tonnes i.e. by about 14 %. Operating the higher pay load at lower.speeds could more than nullify advantages. Section capacities will reduce dtie to slower freight trains and increased speed differential with coaching trains.
‘ There appears to be scope for upward revision in certification of safe speeds.” .
In view of above the RDSO is requested to send their comments regarding upward revision in certification of safe speeds.
df net
(T. Gupta) fe Executive Director, Civil Engg. (G)
DIDO
DT
YD
EDe
- Railway Board. ~ No. 2008/CEDO/ SR/13°-— - _ ~~~ New Delhi, dt. 15.7. 2008 ~ Copy forwarded for information to: ™~ CCRS, Compound of DRM/NER, Ashok Marg, Lucknow -226001 w.r.t. his
~ endorsement No. @4,12011/04/2008- aoftro dated 12.05.2008
~ Y i
© (T.Gupta) ~ for Secretary, Railway Board.
~ Copy to: The General Manage t Centra} Railway, Alahabad. w.r.t his
- letter No.355-W/CRS/BG OT+2TP¥ All BE/NCR/TM dt:03-03:2008 ~ = , for information. — “ ms ,
id
2
DIMI
OL
NM
D FOO ODD YOY.)
ya
“
P27 OOOD OMX)
2 ips
MIT atachHta GOVERNMENT OF INDIA ~ GIF VY 2a data MINISTRY OF RAILWAYS CP
er (3a BrS RAILWAY BOARD ) o. 2008/CEDO/ SR/12 New Delhi, dt. 15.7. 2008
The Director General/Motive Power RDSO, Manak Nagar Lucknow *
Sub: Final Speed Certificate for maximum permissible Speed of 22.32t (CC+6+2) axle load Broad Gauge Bogie Open Wagon type BOXNHSM1
Ref: (i) RDSO’s Letter No MW/SPD/BG/ BOXNHSM1/IR dt.08.11.2007 (ii) GM(Engg)NCR’s letter No. 355-W/CRS/ BOXNHSM1 (CC+6T+2T) / Al
BG/NCR/TM dt.07.04.2008
Vide NCR’s letter referred at (ii) above, Board’s Sanction has been sought for regular operation of “Broad Gauge Bogie Open Wagon type BOXNHSM 1” ( CC+6T+2T) having maximum axle load of 22.32t for all the BG sections of North Central Railway based on the Final Speed Certificate issued vide RDSO’s letter referred at (i} above. However, while considering the proposal, Board (ML,MT,MM & ME} have observed as follows:
Satisfactory Test Speed (As in Speed _ Certificate} Safe Speed processed
Loaded Empty . Loaded Empty 110 100 60 80
“ Carrying capacities of the wagons have been enhanced by 8 tonnes Le. by about 14 %. Operating the higher pay load at lower.speeds could more than nullify advantages. Section capacities will reduce due to slower freight trains and increased speed differential with coaching trains.
There appears to be scope for upward revision in certification of safe speeds.”
4
In view of above the RDSO is requested to send their comments regarding upward revision in certification of safe speeds.
unt) (T. Gupta) Executive Director, Civil Engg. (G)
( Railway Board. No. 2008/CEDO/ SR/12 ' New Delhi, dt. 15.7. 2008 Copy forwarded for information to: CCRS, Compound of DRM/NER, Ashok Marg, Lucknow -226001 w.r.t. his endorsement No. #y,12011/04/2008- aoftro dated 12.05.2008
Lu
(T.Gupta) for Secretary, Railway Board.
Copy to: The General Ma uthCentral Railway, Allahabad. w.r.t his letter No. 355-W/CRS/ Ei T$2T) /\Al BG/NGR/TM -dt.07.04.2008
, for information. Co Documents snd Serrinigs ddministratimDerkton ae -8 etoea herer 4
‘3
yi)
@ 4 Yo
a 4% pI
")
(PAPI
I CV
td
AD
GD
iD
) PONY OI
DON DAN
4)
gad ‘Braentey GOVERNMENT OF INDIA. GI fF Jar sisal MINISTRY OF RAILWAYS
(Jaa Ws RAILWAY BOARD )
No. 2008/CEDO/ SR/11 New Delhi, dt. 15.7. 2008
The Director General/ Motive Power
RDSO, Manak Nagar Lucknow
Sub: Final Speed Certificate for maximum permissible Speed of 22.32t (CC+6+2) axle load Broad Gauge Bogie Open Wagon type BOXN.
Ref: (i) RDSO’s Letter No MW/SPD/BG/BOXN /22.32¢(IR} dt. 31.10.2007 (i) GM(Engg)NCR’s letter No. 355-W/CRS/BOXN (CC+6T+2T) / All
BG/NCR/TM dt.04.03.2008
Vide NCR’s letter referred at (ii) above, Board’s Sanction has been sought for regular operation of “Broad Gauge Bogie Open Wagon type BOXN” ( CC+6T+2T) having maximum axle load of 22.32t for all the BG sections of North Central Railway based on the Final Speed Certificate issued vide RDSO’s letter referred at (i) above. However, while considering the proposal, Board (ML,MT,MM & ME) have observed as follows:
Satisfactory Test Speed (As in Speed Certificate) Safe Speed processed
Loaded Empty Loaded Empty
70 80 60 80
“ Carrying capacities of the wagons have been enhanced by 8 tonnes i.e. by about 14 %. Operating the higher pay load at lower speéds could more than nullify advantages. Section capacities will reduce due to slower freight trains and increased speed differential with coaching trains.
There appears to be scope for upward revision in certification of safe speeds,”
In view of above the RDSO is requested to send their comments regarding upward revision in certification of safe speeds.
__. d uU—
(T. Gupta) Executive Director, Civil Engg. (G}
i Railway Board. No. 2008/CEDO/ SR/11i New Delhi, dt. 15.7. 2008 Copy forwarded for information to: CCRS, Compound of DRM/NER, Ashok Marg, Lucknow 226001 wort. his
endorsement No. 7a,12011/04/2008- aoftro dated 12.05.2008
adapta for Secretary, Railway Board.
Copy to: The General Manager(Engs) Non Central Railway, Allahabad. w.r.t his letter No. 355-W/CRS/BO J/NCR/TM. dt.04.03.2008, for information. CADoctmtcars md Settings Adminisimins\Berkinp NURS eased letter oe
Jy
ty
sd
ed
cy
0) fy)
yt)
» 6)
f yy
ty
PtP DID
CD
TP DY)
> fyi)
aaa ABacitae GOVERNMENT OF INDIA G [= wat sala MINISTRY OF RAILWAYS 24 (ea BS RAILWAY BOARD )
No. 2008/CEDO/ SR/10 New Delhi, dt. 15.7. 2008
The Director General/Motive Power RDSO, Manak Nagar Lucknow
Sub: Final Speed Certificate for maximum permissible Speed of 22.32t (CC+6+2) axle load Broad Gauge Bogie Covered Wagon type BCNAHSM1
Ref: (i) RDSO’s Letter No MW/SPD/BG/ BCNAHSM1/22.32t(IR) dt.22.11.2007 (ii) GM(Engg)NCR’s letter No. 355-W/CRS/ BCNAHSM1 (CC+6T+2T) / All
BG/NCR/TM dt.07-14.03.2008
Vide NCR’s letter referred at (ii) above, Board’s Sanction has been sought for regular operation of “Broad Gauge Bogie Covered Wagon type BCNAHSM1’ ( CC+6T+2T) having maximum axle load of 22.32t for all the BG sections of North Central Railway based on the Final Speed Certificate issued vide RDSO’s letter referred at (i) above. However, while considering the proposal, Board (ML,MT,MM & ME) have observed as follows:
Satisfactory Test Speed (As in Speed _ Certificate) Safe Speed processed Loaded Empty Loaded Empty
105 110 60 80
“ Carrying capacities of the wagons have been enhanced by 8 tonnes i.e. by about 14 %. Operating the higher pay load at lower speeds could more than nullify advantages. Section capacities will reduce due to slower Sreight trains and increased speed differential with coaching trains. .
There appears to be scope for upward revision in certification of safe Speeds.”
In view of above the RDSO is requested to send their comments regarding upward revision in certification of safe speeds.
oe Executive Director, Civil Engg. (G)
Railway Board. No. 2008/CEDO/ SR/10 New Delhi, dt. 15.7. 2008 Copy forwarded for information to: CCRS, Compound of DRM/NER, Ashok Marg, Lucknow -226001 wz.r.t. his endorsement No. #4.12011/04/2008- aoito dated 12.05.2008
uf 2
(T.Gupta) for Secretary, Railway Board.
ilway, Allahabad. w.r.t his
BG/NCR/TM dt.07-14.03.2008
Copy to: The General Mana: th letter No. 355-W/CRS/ BCNAHSM1' (CCHS RET) / , for information. core CeDecunemns mud § cringyitd deruaietentorDesktmy NCR -8 cases letter dere,
ae BPO
“e
FF EPEPEDSSI INSIDE YOO OOOO
DA
ODO sO
0 od
L———
\D 0 Saat aezarae GOVERNMENT OF INDIA aff Re 2a saictal MINISTRY OF RAILWAYS pe a ae (aa gs RAILWAY BOARD )
Nq 2008/CEDO/ SR/09 New Delhi, dt. 15.7. 2008 The Director Genéral/ Motive Power RDSO, Manak Nagar a Lucknow ”
Sub: Final Speed Certificate for maximum permissible Speed of 22.32t (CC+6+2) axle load Broad Gauge Bogie Coverded Wagon type BCN Ref: (i) RDSO’s Letter No MW/SPD/BG/BCN/22.32t(IR) dt. 22.11.2007 (i) GM(Engg)NCR’s letter No. 355-W/CRS/BCN (CC+6T+27) / All
BG/NCR/TM dt.12-19.03.2008
Vide NCR’s letter referred at (ii) above, Board’s Sanction has been sought for regular operation of “Broad Gauge Bogie Coverded Wagon type BCN” ( CC+6T+27T) having maximum axle load of 22.32t for all the BG sections of North Central Railway based on the Final Speed Certificate issued vide RDSO’s letter referred at (i) above. However, while considering the proposal, Board (ML,MT,MM & ME) have observed as follows:
Satisfactory Test Speed (As in Speed Certificate) Safe Speed processed Loaded Empty Loaded Empty
100 100 60 80
“ Carrying capacities of the wagons have been enhanced by 8 tonnes ie. by about'14 %. Operating the higher pay load at lower speeds could more than nullify advantages. Section capacities will reduce due to slower freight trains and increased speed differential with coaching trains. ;
There appears to be scope for upward revision in certification of safe speeds.”
In view of above the RDSO is requested to send their comments regarding upward revision in certification of safe speeds.
C, (T. dupta) Crxecutive Director, Civil Engg. (G)
_ ....... Railway Board. - No. 2008/CEDO/ SR/O9 = =6°—— New Delhi, dt. 15.7. 2008 Copy forwarded for information to: CCRS, Compound of DRM/NER, Ashok Marg, Lucknow -226001 w.r.t. his endorsement No. @4,12011/04/2008- aoftre dated 12.05.2008
Cc
(T.Gupta) _ for Secretary, Railway Board.
Copy to: The General Manager(Engg)North Central Railway, Allahabad. w.r.t_his letter No. 355-W/C i 6) ; G/NCR/TM dt.12-19.03.2008 , for information. CoDecuments and Set inghAdminiantes Desk NCR Ses
_~
Dd
RP ey
|G POG)
POO
VI DY OM
DY
4 p70
1?
'.1);CAO7CN/BNC, South Western Railway, Bangalore wort. his letter no.
ML MIT BIH GOVERNMENT OF INDIA a Xe Baer MINISTRY OF RAILWAYS
(wat Ws RAILWAy BOARD )
No, i ° 2007/CEDO/SD/0. New Delhi, dated 16.07.2008 The Executive Director (Track) RDSO,Manak Nagar Lucknow.
Sub: IR Schedule of Dimensions 1676 mm Gauge(BG) Revised,2004 Ref: Board’s letter of even No. dt. 17.06.2008 ,
Vide above referred Ictter vou were requested to examine the SWR’s case and send the same to Board with your comments/recommendations for further necessary action wherein it was brought out that for 66 KV power line crossing the vertical clearance as given in ACTM was different from the stipulation of IR SOD, BG Revised,2004. It was also brought out that the ACS No. 16 dt.18.09.06 to Railways Manual of AC Traction(ACTM)Vol.1] Pt.Il Appendix IV,1994,
stipulated lesser vertical clearances than that contained in item No. 11 of SOD Revised,2004. Accordingly the Rly had requested to issue CS to SOD,
Revised, 2004,
Now Board (ML & ME) have approved the provisions contained in ACTM
for modification to SOD Revised,2004 also and accordingly SOD needs to be
modified to cover the ACTM provisions ( copy of noting enclosed) .
You arc therelore requested to issue addendum & correction slip no.4 to
SOD Revised, 2004 at the earliest .
pe sO Enck As above. |
( T.Gupta }
Execulive Director Civil Engg.(C)
. Railway Board. Copy to :- . he
WI/CN/77 /PLX/GUNL dated 23.05.2008 2)’ CAQ/C, Southern Railway, Egmore, Chennai-600 008 w.r.t. his letter no.
W.347/T/8/CN dated 20.06.08, for information & necessary action as- Any
relaxation of clearances by Electrical Inspector to the Government (HIG), given
in exercise of provisions of the He Act and provisions contained in ACTM, which has been issued with appravel of Board, is valid. These do tot require
7 re- endorsement from Board.
J Ag
‘)
4)
) WIN IIQOIIAHN
DY
bot
ele
(92
ass
-d-
The SOD needs revision as indicated at np-2. This may please be done at the earliest by issue of requisite correction slip immediately. While revising and updating the SOD, text as in italics may also be added in para | fi) at page 7 as : shown below :
“11() Minimum height above rail level of the lowest portion of any conductor crossing a railway, including guard wire, other than telegraph, telephone and other such low tension wires or a traction trolley wire,
under conditions of maximum sag shall be as indicated below untess and <M || otherwise relaxed by the Electrical Inspector to the Government under ° provisions as also listed in ACTM Vol.dE (Part-Il) Para 21". \ Soyer
Any relaxation of clearances by Electrical Inspector to the Government (EIG), given in exercise of provisions of the IE Act and provisions contained in Vine ACTM, which has been issued with approval of the Board, is valid. Remedy at B Board’s level is not appropriate when this is already available at field level.
Keeping in view the need for revision in SOD, consequent upon ACTM
“A At revisions, Board (ML, & ME) may take a view that relaxation obtained under
CTM provisions are acceptable and do nol require re-endorsement from fe
ee or AML
10.07.08
ed by Coe ACTH ce OW) sop by he andar zo| :
ae revved colina « Iie Tree h be clang ven ein,
[mz| BY 2 D)Acuoad With CCRS » Oe hae Apprrionka thee eloufecelne ob B
Reply mma be peak accnelong ty fo TM. Aas
__ Ardea hy em a | Oo7og
yk vane .
a .
ya)
irony
{)
oy
The schedule of dimensions of SOD of 2004 (page 7) draws upon the
clearances stipulated in and as appearing in the ACTM Volume-II Pt.Il
issued by Ministry of Railways in 1994 (Clause17.3). These clearances have
since been superceded vide AC slip No.16, copy of which is placed in folio side
for the clauses 17.3 and 21.1.
Wherever specific provisions exist in codes and manuals for providing
relaxations, indicating the authorities competent to grant such relaxations,
condonation from the Board is not necessary. In the instant case, provisions
TM with the correction slips may be availed of by the
ae Aqaessnber Wilect.) 10th June, 2008
contained in the AC
Railway without referring to the Board.
WO G08
ar
Ay “h on / pk
Ee/g -- on . Los Le “he “7 uv KW
ep ce | ps? a pee |
__ yo 60%
S 2 cS or of ay. USse ed) -i3]eleP een
in ne aor *) -C
GOVERN#ENT OF INDIA MINISTRY OF RAILWAYS
(RAILWAY BOARD)
No.2000/CEDO/ORI/13 , New Delhi, dated BS .07.2008
the Chief Engineer/CON/I,
Eastern Railway,
Kolkata.
Sub: - Opening of new B.G. electrified Dn line from Akra (Km
19.42) to Nangi (Km 22.39) station on Sealdah- Budge
Budge section of Sealdah division of Eastern Railway
for Public Carriage of Passengers.
Ref Your office letter No. CE/Con/W/1803/CRS dated
17.10.2000 and 09.07.08. KKK
17.10.2000 referred above,
Eastern Circle inspection Note
e items numbered as 7.3, 8.3,
With reference to your letter dated
compliance for observations given in the CRS/
No. 608/1/2000/861/H dated 15.03.2000 for th
12.2, 12.3 and 12.4 are not satisfactory.
You are requested to take necessary action to comply with above
observations.
The action taken on different item recorded in juxtaposition to the above
para’s may also be furnished to CRS/Eastern Circle endorsing a copy to this
office.
yf Re
( r.Ghpta )
Exec.Director, Civil Engineering (G)
(Railway Board).
93 JF
fcr mo
: DE <
Dye
SY
yy
typed.)
+)
dy)
PDD VOD?)
?
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS
(RAILWAY BOARD)
No.2004/CEDO/ORI/78 _ . New Delhi, dated 24 .07.2008
The Chief Administrative Officer (Const. ) South Central Railway, Secunderbad. .
Sub: -Opening of Railways- Doubling of track between Guntakal and Hosspet stations- Opening of the new BG gauge converted Up main line between Kudataniu (incl.) and
Toranagallu (excl.} station (from Km. 188/2-3 to 176/9- 10 for a length of 11.297 Kms) for public carriage of
passengers.
Ref: i) CCRS’s letter No. R. 12037/05/2004-RS dated
23.09.05. ii)CRS/Southern Circle, Bangalore’s letter No.
R12037 /4/2004/SWR dated 23.08.2004 (Copy enclosed).
KKAE
The above section was inspected by CRS/Southern Circle on 28.07.2004 and opening of the section was authorized by him vide his letter No. R 12037 /4/2004-SR dated 28.07.2004 with certain observations. The inspection report has been sent to Board with a copy to CAO/C/SW Railway.
Board vide letter of even number dated 31.03.05 followed by reminders dated 2809.07 and 04.06.08 requested CAO/SWR to take necessary action to comply with various observations made in CRS/Southern Circle’s above letter for opening of the section.
Chief Engineer/CN/East/BNC/SW Railway vide letter dated 26.06.08 has informed that the subject work was executed by CAO/C/SC and after
commissioning the section was handéd over to open _tme-of South-Western Railway and to obtain necessary compliance from CAO/C/SCR.
You are, therefore, requested to intimate the compliance of various
observations made by CRS/Southern Circle vide his above letter for opening of
the section recorded in the juxtaposition to the above document endorsing a
copy to Board office for communicating the approval of the opening of the
section by the Board.
J an
(rota Exec. Director, Civil Engineering (G)
(Railway Board).
Or 73
3) C)
ooworn
yor
DIO
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS
(RAILWAY BOARD)
No.2005/CEDO/ORI/28 New Delhi, dated 24-.07.2008
The Chief Administrative Officer/C,
North Western Railway, °
Jaipur. .
Sub:- Opening of Idgah-Bharatpur BG single line, non-
electrified section of Agra division of North Central
Railway, after conversion of MG line, for goods and
passenger traffic.
Ref: i) CCRS’s letter No. R. 12015/1/2005-CCRS dated
27.10.05.
ii)CRS, North Eastern Circle, Lucknow’s letter No.
800/1/B/OPG/PT/ 278 dated 21.06.2005 (Copy
enclosed). RREK
The above section was inspected by CRS /North Eastern Circle on 024
and 3% May 2005 and opening of the section was authorized by him vide his
letter No. 800/1/B/OPG/Ptt1 dated 05.05.2005 with certain observations. The
inspection report has been sent to Board with a copy to CAO/C/NC Railway.
Board vide letter of even number dated 17.08.06 followed by reminders
dated 04.10.07 and 27.05.08 requested CAO/NCR to take necessary action to
comply with various observations made in CRS/NE Circle’s above letter for
opening of the section. «
vide letter dated 19.06.08 has informed
that the subject work was executed by CAO/C/NWR and after commissioning
the section was handed over to open line (Agra Division) of North Central
Railway-and-to-obtain-necessary. compliance from CAO/C/NWR.
Chief Engineer/C/NC Railway
ested to intimate the compliance of various
Circle vide his above letter for opening of the
ndorsing a copy
f the section by
You are, therefore, requ
observations made by CRS/NE
section recorded in the juxtaposition to the above document ¢
to Board office for communicating the approval of the opening o
“4
Exec. Director, Civil Engineering (G)
~ ee rae ay (Railway Board).
‘iniatey "A a
“nr |
GE. 7
m™
‘3
PAD YY
TI
TD DOR
YD
DED
YoY
VY,
YO
OO
OD
t
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS
(RAILWAY BOARD)
No.2002/CEDO/ORI/26 . New Delhi, dated Q24-07.2008
The Chief Bridge Engineer,
East Central Railway,
Hajipur.
Sub: - Opening of electrified section from Sindri Block Hut to
Patherdih of Dhanbad division of East Central Railway for
public carriage of passengers.
whe Ref: Your letter No. W-8/552/09/ Misc /Pt.I dated 10.07.08.
A copy of CRS/Eastern Circle /Kolkata’s inspection note along with
Board’s letters of even number dated 27.11.02, 10.06.03, 05.07.04, 30.09.04,
30.12.04, 21.09.07, 27.06.08 and Eastern Railway’s letters dated 11/12/02
and 08.10.04 are enclosed herewith. However, the compliance regarding the
action taken on the CRS’s recommendations/ suggestions has not been received
even after 06 years despite of various reminders referred above.
The matter has already got badly delayed. It is, therefore, requested that
parawise remarks against the relevant para may be furnished to Commissioner
of Railway Safety endorsing copy to Board office for communicating the
approval of the Board for the opening of the above section for public carriage of
passengers.
oo ¢ <q aoa = Tupta Lc. Director, Civil Engineering (G) gq Aras
of Railways EX)
ag ae (Railway Board).
WyaRy hoard
ata ee are
ins ¥ aah iat?
GE 75
(34)
For
yoda
ty
‘yd
a)
fy
a
Ooo
J YOOUIWIIM
DYDD
DD
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS
(RAILWAY BOARD)
No.99/CEDO/ORI/23 "s New Delhi, dated .24-.07.2008
The Chief Engineer/Con/Nortbh-I,
East Central Railway, Mahendrughat, Patna.
Sub:- Opening of BG converted line from Gorakhpur Cantt. to Narkatiagunj section of Lucknow, Varanasi and Samastipur (at present EC Railway) division of NE Railway for passengers traffic.
Ref: Your letter No. ECR/CAO/CON/CE/N-1/CRS/3521 dated
15.07.08. KK
A copy of CRS/North Eastern Circle/Lucknow’s inspection note along with Board’s letter of even number dated 02.08.99 and 18.10.07 are enclosed
herewith. However, the compliance regarding the action taken on the CRS’s recommendations/suggestions has not been received even after 09 years despite of various reminders referred above.
The matter has already got badly delayed. It is, therefore, requested that parawise remarks against the relevant para may be furnished to Commissioner of Railway Safety endorsing copy to Board office for communicating the approval of the Board for the opening of the above section for public carriage of passengers. ~_
“lota) ( T.Gupta )
Exec.Director, Civil Engineering (G)
Te. ae (Railway Board).
Ministyyypt Railway
vay -Thoara
a aay ofa arty is s3ug iA “we UT te
OF 76
FOO IOOIIYIOI
DN VIO
O 219 DDD
JPRPIOODIO
OD
VD GOVERNMENT OF INDIA MINISTRY OF RAILWAYS
~ (RAILWAY BOARD) ~ —
No.99/CEDO/ORI/32 "hs New Delhi, dated? 4-.07.2008
The Chief Engineer (G), Central Railway, Mumbai.
Sub:- Unauthorized hutments/slums alongside the track in Mumbai Suburban section of Central Railway.
Ref: Your letter No. W/415/L/PCDO/ 07-08/Correspondence dated 03.07.08.
whee
A copy of CRS/Central Circle/Mumbai’s inspection note along with Board’s letter of even number dated 31.03.2000 are enclosed herewith. However, the compliance: regarding the action taken on the CRS$’s recommendations/suggestions has not been received even after 08 years despite of various reminders referred above.
The matter has already got badly delayed. It is, therefore, requested that parawise remarks against the relevant para may be furnished to Commissioner of Railway Safety endorsing copy to Board office for communicating the
, approval of the Board for the opening of the above section for public carriage of passengers.
ee Exec.Director, Civil Engineering (G)
(Railway Board).
f \ p20
0 >
J 2
J) FQ
DD
a)
) a)
) YVOIOND
DIIODOD
III DIAYD
SK OF
Xp
~J
Zo Sad atawHray GOVERNMENT OF INDIA ae daleral MINISTRY OF RAILWAYS
(Feat ars RAILWAY BOARD )
No. 2008/CEDO/SD/08,. New Delhi, dated 01.08.2008
The General Manager(Engg). * Southern Railway, HQ. Office, Chennai-600 003
Sub:Electrification of Trichur- Guruvayur Section- Condonation of infringements due to existing Engineering structures (ROBs) of Southern Railway
Ref:Your letter No.W.573/RE/3 ,dt.06.05.2008
With reference to your above application sent through Chief commissioner of Railway Safety, Lucknow, the approval of Ministry of Railways, Railway Board is hereby communicated for adoption of lesser vertical clearances at ROBs no.TG 34,TG 36 & TG 50(skew) at Kilometreage 11/800-900,12/600-700 ¢& 17/000-100 between Trichur~ Guruvayur Section of Southern Railway as listed in Form-XVII & shown in drawings enclosed with your above
referred application.
e qo
S/— { T.Gupta ) x ecutive Director Civil Engg. (G)
Railway Board.
No. 2008/CEDO/SD/08. New Delhi, dated 01.08.2008
Copy forwarded for information to: (i) CCRS, Compound of DRM/NER, Ashok Marg, Lucknow -226001 w.r.t. his
endorsement No. Q.11017/04/2008-acf&o dated 17.07.2008 (u) C.R.S./Southern Circle, 7, Seshadri Road, Gandhinagar, Bangalore-560 009
. w.r.t. his letter No.Q.11017/1/2008-09 SR/530 dt.30.06.2008.
J a
(T. Gupta)
for Secretary, Railway Board
4
hes - pee om Wed
a 4
aa Eignatu.: owt see ase cad sce 061 CCL eeeOe ee
erat ay ef Bato
cenit 2 de et of lagur +
6
a -
|
" SK 2
oN
a 3 GOVERNMENT OF INDIA _ \ MINISTRY OF RAILWAYS | Neg 6 (RAILWAY BOARD) a NN __ Nov {CEDO/ORI/1. New Delhi, dated | .08.2008
oO The Chief Commissioner of Railway Safety, . DRM NER Compound, Ashok Marg, C Lucknow-226001. ‘ ~
Sub: Opening of the new BG line between Nischindapur- oO Kashinagar stations in Sealdah division of Eastern Railway for public carriage of goods and passengers
o traffic. o~
, Ref: (i) CCRS’s Letter No. R, 12012/2/2000-RS dated oO 18.02.2000 . ~ (iiJCRS’s (Eastern Circle) - letter No. ~ 613/1/C/2000/772/H dated 27.01.2000 rm rer
o With reference to your endorsement No, R. 12012/2/2000-RS dated ~ 18.02.2000, the approval of Ministry of Railways is hereby communicated to . the recommendation of Commissioner of Railway Safety, Eastern Circle, a Kolkata for opening of the above section for public carriage of goods and ° passengers traffic as per his letter No. 613 /1/C/2000/772/H dated o~ 27.01.2000. . aA
rn ; (alga) A Ie Executive Director Civil Engg.(G) - Railway Board. on
A No. 2000/CEDO/ORI/1. New Delhi, dated | .08.2008 .
a Copy forwarded for information to: = oO ‘ (i) The Commissioner of Railway Safety, Eastern Circle, 14, Strand Road (12th mo Floor}, Kolkata-700001, w.r.t. his letter No. 613/1/C/2000/772/H dated
27.01.2000. . ~ {ii) The Chief Administrative Officer (Const.), Eastern Railway, Kolkata.
rN (iii) The General Manager (Engg), Eastern Railway, Kolkata.
va
os
.. { T.Gupta } ON for Secretary, Railway Board. a
oN YZ
™ Vr
m™
AN
ee / SE Ne oP \ oN «(5% GOVERNMENT OF INDIA
zs \ MINISTRY OF RAILWAYS (RAILWAY BOARD)
No. 2001/CEDO/ORI/3. . New Delhi, dated | -08.2008
The Chief Commissioner of Railway Safety, DRM NER Compound, Ashok Marg, Lucknow-226001. ‘
Sub: Introduction of 25 KV single phase Electric traction for passenger services on Dum Dum-Tala section fo Circular Railway in Sealdah division of Eastern Railway.
Ref: (i) CCRS’s Letter No. R. 12042/3/2000-RS dated 25.09.2000 (ii)CRS’s (Eastern Circle) letter No. 3600/1/D/ 2000/215/ H dated 22.08.2000
With reference to your endorsement No. R. 12042/3/2000-RS dated 25.09.2000, the approval of Ministry of Railways is hereby communicated to
a the recommendation of Commissioner of Railway Safety, Eastern Circle, } Kolkata for energisation and introduction of electric traction of the above
cy section for passenger service as per his letter 3600/1/D/2000/215/ H dated
22.08.2000. o~
law | 1. —— ' ( T.Gupta )
© Executive Director Civil Engg.(G) * Railway Board.
No, 2001/CEDO/ORI/3. New Delhi, dated | .08.2008
Copy forwarded for information to: Ce (i) The Commissioner of Railway Safety, Eastern Circle, 14, Strand Road (22th
Floor), Kolkata-700001, w.r.t. his letter 3600/1/D/2000/215/H dated 22.08.2000.
(ii) The Chief Electrical Engg., Metro Railway, 33/1, J.L. Nehru Road, Kolkata - 700071,
(ii)/The General Manager, Metro Railway, Kolkata.
dT 7 ( T.Gupta )
oA for Secretary, Railway Board.
gene aed wee Fie with Enolorure
=e ee LY
yd)
7 D
J) )
7
PF FPADIAIDIID IDI
DDD DD Y
D )
v
cn Ss Yer GOVERNMENT OF INDIA NY MINISTRY OF RAILWAYS Fry (RAILWAY BOARD)
No. 006/CEDO/ORI/39. New Delhi, dated ! .08.2008
The Chief Commissioner of Railway Safety, DRM/NER Compound, Ashok Marg, Lucknow-226001. .
Sub: Opening of newly converted BG line after conversion from MG to BG between Siwan and Thawe stations of Varanasi division of North Eastern Railway for public carriage of passengers.
Ref: (i) CCRS’s Letter No. R 12035/01/2006/CCRS dated 25.08.06 (ii)/CRS’s (North Eastern Circle) letter No. 421/1/OPG/ PT/761 dated 04.08.06
With reference to your endorsement No. R 12035/01/2006/CCRS dated 25.08.06, the approval of Ministry of Railways is hereby communicated to the recommendation of Commissioner of Railway Safety, North Eastern Circle, Lucknow for opening of the above section for public carriage of passengers as per his letter No. 421/1/OPG/PT/761 dated 04.08.06.
a -—_
lp ( T.Gupta ) ’ Executive Director Civil Engg.(G)
Railway Board.
No. 2006/CEDO/ORI/39. New Delhi, dated | .08.2008
Copy forwarded for information to: (i) The Commissioner of Railway Safety, North Eastern Circle, Hazratganj, Lucknow-226001, w.r.t. his letter No. 421/I/OPG/PT/761 dated 04.08.06. (ii) The Chief Administrative Officer (Const.), North Eastern Railway,
Gorakhpur. (iii) The General Manager (Engg), North Eastern Railway, Gorakhpur.
T 2
( T.Gupta ) for Secretary, Railway Board.
RIES
wy)
™ ~
DVD.
XR IVD DD
) »
) J)
PYIOI
9D
IDI
7D DD
>)
> 3
“
\ Yeot Waa sata GOVERNMENT OF INDIA ye % et daleta MINISTRY OF RAILWAYS
(aaa Gs RAILWAY BOARD )
No. 2007/CEDO/SR/23 New Delhi, dt. 01.08.2008
The PCEs / CE(Co-ord) All Zonal Raiitways and MD/KRCL
Sub: Route Clearance for running of goods trains with BCNHL B.G. wagons.
Ref: (i) Railway Board’s letter of even no. dt. 22.04.2008 (ii) RDSO’s letter No CT/DG/LW/BCN dated 11.07.2008
Vide Board's letter referred at (i) above, the Railways were advised to identify and remove the infringememnts for running of goods train with BCNHL wagon by 31.08.2008 in consultation with RDSO.
Now vide letter referred at (ii) above, RDSO has informed that the profile of BCNHL wagon has been revised by Wagon Dte. & is under approval.
Accordingly you are requested to pend the work of identification and removal of infringements for the present.
2
E] ( T.Gupta ) ’ Executive Director Civi] Engg.(G)
Railway Board.
Copy to - (i) Ex. Director (Track) RDSO, Manak Nagar,Lucknow-226011 ~“ __ (i) EDMECFrt.) / Railway Board for information.
tc
> D7)
3 )
> )-3
2 >
dF
990)
-}
9 AYP
sD
2) 3
} 4
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS
(RAILWAY BOARD)
“Ne: 2008/EEDO/SM/I- New Delhi, dated 4/8/2008,
The General Managers (Engg), East Central Railway, Eastern Railway, North Central Railway, Northeast F tontier Railway, Northern Railway, North Western Railway, South Central Railway, South East Central Railway, South Western Railway, West Central Railway and Western Railway.
Subject:- System Maps
Reference: - Board’s letter No. 92/CEDO/SM/1 dated | 1.2.1992 (copy enclosed) and dated 16.1 1.2007.
As per Board’s letter dated 11.2.1992, the System Maps updated and corrected as on 31 March 2008 of your Railway were to reach Board by 31* July 2008 but it is seen that same is still awaited from your Railway.
reference,
4 -
It may please be ensured that the System Maps have been prepared Strictly in accordance with instructions contained in the letter quoted above. Also in future; -you are tequested-te Serid these maps to Railway Board by 31" of July every year.
woe mr rt ee 7
Encl :- As above (T. GUPTA) " Executive Director Civil Engg (G)
, Railway Board.
230 C/\Usersidelh Documents\GOVERNMENT ‘OF INDIA.doc
a
) 5
Sete a2
Seitttem
sy sim
rt
wmicelaige
wer gen
to the Bane standard, 58 per guide lines given below:—
and ATH GOVERNMENT OF INDIA
ty FSTST MINISTRY OF RAILWAYS ( tear ae Railway Board )
~ GB/CEDOISE/1 Star te, aE Reee—noo01; Ry copatgge 5 Rail Bhavan, New Delhi!-110001, dated
fhe General Renagers(Bnge.), All.- And ien Hei lve: i _.
Sub: “Syaten Kapa.
Ref: i) This office letter No.82/wD0/SK/1 dated 12.4,.82,
1i)This office letter Ho.85/wD0/su/1 dated 13.5.83.
iii) This office letter 0483 /x00/s4/1 dated 14.6. 83.
iv} This office letter ¥0.85/¥D0/su/1 dated. 7.5.85.
RELLERE
in’ supersession of ail earlier instructions in connection with: préparation’ of Syatem Maps of your railway system (BG,MC and ¥G) circulated under thie office letters quoted above, the Board have decided that the System Maps on all Zonal railways should be Prepared
1. The size of the Rep should be 75 cma x 60 cna,
” the Byatem maps should be- "Prepared to tHe scale 1 cz= 15.00 Kus.
Je legend to be used on the system maps should be eRe per Bpecieen enclosed, ~ RRR EE
4. State bounderies should be shown on the map: es ’ indicated-in -the-specimen—Legend—and_—ahaded—in - different coleurs prominently. Phe map should also show the divisional jurisdiction by way
- of colouring the railway lines in different colours, eet ee
5e The statistical information pertaining to ‘Route ' Kilometres’ and ‘Running Track Kilometres" should
be tabulated as per format enclosed on the right . band side of the map in a table of ebout 15 ene I
‘ 60 cms,
6. It may be ensured thet the information in respect . Of "Route Kilometres’ and "Running Track Kilometres! + $0 be shown on the system map tallies with the
Kilometrage Statement Fo.8 being furnished by your railway to the Secretary (Statistics), Railway Board for printing in Indian Railwayea Annual Booka of Statietical Statements and Proforma 'D' in Finel Works Programme Vol. III = Track Renewal.
Contdee 2/-
To Sorks-~in-progress Pertaining to Hey lines, Doublingsa and Conversions ahould also be ahown ou the syster map as per the legend, 8. ‘SpehemMaps-ehould be updatea “OVEry year aa on 31st Harch and 20 copies subm itted by 318+ July
ra's Office, Fifteen le mapas of your Gwing diviaione! ies in different reoh may alao be
copies of the Public Time Tab railway (Ten plain. and Jurisdiction and State bouddar Coloura) correct aa on 3tat Ka 4ent alongwith the system maps The railways should submit onl
10, System Maps submitted to by one S.A, Grade Officar only and need not bear any
y the printed maps, Board should be signed of the Works Branch other Signatures,
The receipt of this lettar May please be acknowled
DA: AS abave.-
. ( S.m.-Sr¥GLa ) Executive Director Civil ‘Ry, Reilyay Board:
wae
LF
gad,
ngineering (c},
are
rde pin
a eres
y 1 at OAM
A
UN ed oy
NY TSAR
SSES S
et RTE
> >»
2 >
Dd Y
) 3
> >235
90050
7) 39
a)
) >
,39)
~
aZ
yoo
> DD
‘)
yD
DD
YI VIVID
D )
> dD
DD
yo
RI IID
j
oe at
wise remarks to
Safety/North Eastern Circle on the inspection repor
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS |
(RAILWAY BOARD) |
No.2007/CEDO/ORI/13 - New Delhi, dated 4§ . 08.2008
The Chief Engineer/Con/East,
North Eastern Railway, .
Gorakhpur. |
Sub: - Opening of new double main line BG section after doubling between Tekniwas station and Daudgur station of Varanasi division of NE Railway for public carriage | of passengers. : .
| Ref: Your lett. No. W/Con/S20/ £/THY-DDP/N*. 0/8401 agtad
22.07.08. wee a
With reference to your letter referred above, it is mentioned that para-
the observations made by Commissioner of Railway
t for the above work have
not been received in Board office.
i A i h
It is therefore, requested that a Copy of parawise remarks against the
icating t rdval
relevant para may be furnished to Board office for communicating the appr
of the Board for the open! 1g of the abe 7 section for public carriage! of
passengers.
, s
Hq ae
( T.cpta } i
Exec. Director, Civil Engineering is) (Railway Board).
fo
YD
Dodd
AS
STD
YD
J yy
PFPA ADD VID
DD
FD
VID
DY
SS
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS
(RAILWAY BOARD)
No. 94/CEDO/ORI/44. New Delhi, dated °>.08.2008
Jie Chief Commissioner of Railway: Safety, DRM NER Compcund, AshokMarg, Lucknow-226001. ,
Sub: Opening of BG Madhosingh-Jhusi Section of Varanasi Division of North Eastern Railway after conversion from existing M.G. to B.G. for the public carriage of passengers.
Ref: (i) CCRS’s Letter No. R. 12035/1/94-RS dated 19.05.94 (iij)CRS’s (North Eastern Circle) letter No. 755 /437/1/B/OPG/PT dated 22.03.94
With reference to your endorsement No. R, 12035/1/94-RS dated 19.05.94, the approval of Ministry of Railways is hereby communicated to the recommendation of Commissioner of Railway Safety, North Eastern Circle, Lucknow for opening of the above section for public carriage of passengers as per his letter No. 755/437/1/B/OPG/PT dated 22.03.94.
Tiny ( T.Gupta ) Executive Director Civil Engg.(G)
Railway Board. ? ’
— No. 94/CEDO/ORI/44. New Delhi, dated©>,08.2008
Copy forwarded for information to: 1) The Commissioner of Railway Safety, North Eastern Circle, Hazratganj,
Lucknow-226001, war.t. his letter No. 755/437/1/B/OPG/PT__ dated 22.03.94. ~
Va The Chief Administrative Officer (Const.), North Eastern Railway,
Gorakhpur. (iii) The General Manager (Engg), North-Eastern Railway, Gorakhpur.
fl
( T.Gupta ) for Secretary, Railway Board.
GO
a Arata
Mi ee oe bailwaye
t |
‘ : caret
e IC. Btgnt ,
WIT ey OF fue GE TORS cere ceeveres eesene enn
n|&
\ tau
oY
5 Sade
} ‘
DDT)
OD )
YIOVID DID
) DV DDD
DD
DWI
YD YS
Ne GOVERNMENT OF INDIA Ne Coe 2a MINISTRY OF RAILWAYS
(RAILWAY BOARD)
No, 2005/CEDO/ORI/10 | New Delhi, dated 05.08.2008
The Chief Commissioner of Railway Safety, DRM NER Compound, Ashok Marg,
Lucknow-226001.
Sub: Opening of Railways- Doubling of track between Bangarapet and Kuppam- Opening of the newly laid BG electrified Up line between Kuppam (excl.) and Bisanattam (excl) from Km. 252/250 to Km. 264/580 in Bangalore City- Jolarpettai section of Bangalore division of South Western Railway for public carriage of passengers.
Ref: {i) CCRS’s Letter No. R. 12027/5/2004-RS dated 25.01.05 (iijCRS’s (Southern Circle) letter No. R-12027/5/2004- SWR dated 13.12.04
eenee
With reference to your endorsement No. R. 12027/5/2004-RS dated 25.01.05, the approval of Ministry of Railways is hereby communicated to the recommendation of Commissioner of Railway Safety, Southern Circle, Bangalore for opening of the above section for public carriage of passengers as per his letter R-12027/5/2004-SWR dated 13.12.04.
, _t- J
( T.Gupta } i Executive Director Civil Engg.(G)
Railway Board.
No. 2005/CEDO/ORI/10. _ New Delhi, dated °S .08.2008
Copy forwarded for information to: (i) The Commissioner of Railway Safety, Southern Circle, 7, Seshdri Road,
Gandhinagar, Bangalore-560009, w.r.t. his letter No. R-12027/5/2004-
SWR dated 13.12.04. (ii) The Chief Administrative Officer (Const.), South Western Railway, 18,
Millers Road, Bangalore-560046. (iii)The General Manager (Engg), South Western Railway, Hubli.
aeaTaa <a of Pafiways 7
‘ omg oF i
ay 8 ( T.Gupta ) — ‘ ue art for Secretary, Railway Board.
ae %
3
DoD. dS
SD
VED
DY
HD -
)
do
) ‘2
DOOIID
YO
PIO VOD III
& 7 S Ge
KX GOVERNMENT OF INDIA ye
\eee \ BR MINISTRY OF RAILWAYS . (RAILWAY BOARD)
No. 2005/CEDO/ORI/11. New Delhi, dated .08.2008 x
The Chief Commissioner of Railway Safety, DRM NER Compound, Ashok Marg,
Lucknow-226001.
Sub: Opening of newly converted BG line between Rajula Jn. and Mahuva stations of Bhavnagar division of Western Railway for public carriage of passengers.
Ref: (i) CCRS’s Letter No. R. 12040/1/2004-RS dated 25.01.05 (ii)CRS’s (Western Circle) letter No. R-12040(359}/(H)525 dated 22.11.04
With reference to your endorsement No. R. 12040/1/2004-RS dated
25.01.05, the approval of Ministry of Railways is hereby communicated to the recommendation of Commissioner of Railway Safety, Western Circle, Mumbai
for opening of the above section for public carriage of passengers as per his letter No. R-12040(359}/(H)525 dated 22.11.04.
ln ( T.Gupta ) Cc Executive Director Civil Engg.(G)
Railway Board.
No. 2005/CEDO/ORI/11. New Delhi, dated <S .08.2008
Copy forwarded for information to: (i) The Commissioner of Railway Safety, Western Circle; 2"¢ Floor, Churchgate
Stn. Bldg. Annexe, M.K. Road, Mumbai-400020, w.r.t. his letter No. R-
12040(359) /(H)525 dated 22.11.04. (ii) The Chief Administrative Officer (Const.), Western Railway, 1st Floor, Stn.
Bldg., Churchgate, Mumbai-400020. . (iii) The General Manager (Engg), Western Railway, Mumbai.
(relptay
ards ai eg Bate of inguin... weeny
le
for Secretary, Railway Board.
87
a)
YN
OD
“2D
6D
yoyo)
dy Sod
eC)
‘)
.OD
> QOD
VIO)
D Dy
‘J.D
YA)
4 st der eX Ge ga GOVERNMENT OF INDIA
oo. \. MINISTRY OF RAILWAYS (RAILWAY BOARD)
ee
No. 2005/CEDO/ORI/19. New Delhi, dated < 5.08.2008
The Chief Commissioner of Railway Safety, DRM NER Compound, Ashok-Marg,
Lucknow-226001. ,
Sub: Opening of Broad Gauge line between Burhwal (Jn.) and
Chowkaghat stations of Lucknow division of North
Eastern Railway after doubling for goods and passenger
traffic.
Ref: (i) CCRS’s Letter No. R. 12025/1/2005-RS dated
07.07.05 {ii)CRS’s (North Eastern Circle) letter No.
403/1/J/OPG/PT/1813 dated 21.03.05
oonee
With reference to your endorsement No. R. 12025/1/2005-RS dated
07.07.05, the approval of Ministry of Railways is hereby communicated to the
recommendation of Commissioner of Railway Safety, North Eastern Circle,
Lucknow for opening of the above section for public carriage of goods and
passenger as per his letter No. 403/I/J/OPG/PT/1813 dated 21.03.05.
Stotay
, (,T.Gpupta )
C_- Executive Director Civil Engg.(G) Railway Board.
No. 2005/CEDO/ORI/19. New Delhi, dated 0S .08.2008
Copy forwarded for information to:
(i) The Commissioner of Railway Safety, North Eastern Circle, Hazratganj,
Lucknow-226001,: w.r.t. his letter No. 403/1/J/OPG/PT/1813 dated
21.03.05. (ii) The Chief Administrative Officer (Const.), North Eastern Railway,
Gorakhpur.
(iii) The General Manager (Engg), North Eastern Railway, Gorakhpur.
QV
( T.Gupta ) for Secretary, Railway Board.
Vi
AUT on sasnoweuperer®
an at Fare gate of inaue aete
a)
YOO
FAO
PIII
DOIIIO
OP? YAY
IV D SOD IDA
AS
~ \er* GOVERNMENT OF INDIA » <{ J: MINISTRY OF RAILWAYS
~ OX (RAILWAY BOARD)
No. 97/CEDO/ORI/8. New Delhi, dated 26.08.2008
The Chief Commissioner of Railway Safety,
DRM NER Compound, Ashok Marg,
Lucknow-226001. ,
Sub: Opening of new BG Up Double Line (Electrified) between
Whitefield-Malur Stations of Bangalore Division of South
Western Railway for the public carriage of passengers.
Ref: (i) CCRS’s Letter No. R. 12027/1/97-RS dated 13.08.97
(ii)CRS’s (Southern Circle) letter No, R-12027 {/1/97-SR
dated 13.06.97 eaeee
With reference to your endorsement No. R. 12027/1/97-RS dated
13.08.97, the approval of Ministry of Railways is hereby communicated to the
recommendation of Commissioner of Railway Safety, Southern Circle,
Bangalore for opening of the above section for public carriage of passengers as
per his letter No. R-12027 /1/97-SR dated 13.06.97.
Loa ( T.Gupta )
Gc Bxccutive Director Civil Engg.(G)
Railway Board.
No. 97/CEDO/ORI/8. | New Delhi, dated % .08.2008
Copy forwarded for information to:
(i) The Commissioner of Railway Safety, Southern Circle, 7, Seshdri Road,
___ Gandhinagar, Bangalore-560009, w.r.t. his letter No. R-12027/1/97-SR |
dated 13.06.97.
(ii) The Chief Administrative Officer (Const.),South Western Railway, 18, Millers
Road, Bangalore-560046.
(iiiJThe General Manager (Engg), South Western Railway; Hiabli.-
(rekpin) for Secretary, Railway Board.
9
|
~
VOT
VOR
¢ 6 5
i’
uy
IO
youd
“2
) )
yO DD 9DVOD
DD
OVD
) ODI
YD
MINISTRY OF RAILWAYS
{RAILWAY BOARD)
A Ye Ns So Ke oy GOVERNMENT OF INDIA
No.2006/CEDO/ORI/49 New Delhi, dated 68.08.2008
The Chief Engineer/Con-6,
N.F. Railway, Maligaon, ,
Guwahati. .
Sub: - Opening of newly restored MG line from station Km 650 (Tejnarayanpur Halt) to station Km. 654 on Katihar
division of NF Railway for public carriage of passengers traffic.
Ref: - Your letter No. W/260/CON/MHI-TNPR dated 30.07.08.
With reference to your letter referred above, compliance for observations given in the CRS/N.F. Circle inspection report dated 10.10.06 for the items numbered as 5.2 and 14.1.5 is not satisfactory.
You are requested to take necessary action to comply with above observations,
The action taken on different ttem recorded in juxtaposition ta the above para’s may also be furnished to CRS/N.F. Circle endorsing a copy to this office.
a & # . Tay
, ‘ . ( T.Gppta )
Exec.Director, Civil Engineering (G) mee ES (Railway Board).
yoORU.,OL
ijt
river
es 3-3-4
t >
a
a)
a) ys) oa
) J
Sap)
edad
3 5D
DD)
> SY
4 GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
(RAILWAY BOARD) No. 2004/CEDO/ORI/8. New Delhi, dated ©f.08.2008
The Chief Commissioner of RailWay Safety, DRM NER Compound, Ashok Marg, Lucknow-226001. ‘
Sub: Opening of new BG down line from Sarju to Colonelganj railway station of Lucknow Division, North Eastern Railway for goods and passenger traffic in connection with doubling of Gonda of Jarwal Road.
Ref: (i) CCRS’s Letter No. R-12025/02/2003-RS dated 17.06.03 (iiJ)CRS’s (North Eastern Circle) letter No. 403/1/G/OPG/ PT/208 dated 08.05.03
aeeee
With reference to your endorsement No. R-12025/02/2003-RS dated 17.06.03, the approval of Ministry of Railways is hereby communicated to the recommendation of Commissioner of Railway Safety, North Eastern Circle, Lucknow for opening of the above section for public carriage of goods and passenger traffic as per his letter No. 403/1/G/OPG/ PT/208 dated 08.05.03.
( nekpta) ‘ Executive Director Civil Engg.(G)
c- Railway Board.
No. 2004/CEDO/ORI/8. New Delhi, dated & 08.2008
Copy forwarded for informationtor = °-—~ = <---> (i) The Commissioner of Railway Safety, North Eastern Circle, Hazratganj,
Lucknow-226001, w.r.t. his letter No. 403/1/G/OPG/PT/208 dated 08.05.03.
(ii) The Chief Administrative Officer (Const.), North Eastern Railway, Gorakhpur.
(iii)The General Manager (Engg), North Eastern Railway, Gorakhpur.
i
( T.Gupta ) for Secretary, Railway Board.
Mf
i2
ti)
3 wa)
i}
aD
d q u
LJ
AD
2)
73
No.2007 /CEDO/ORI/8
The Chief Administrative Officer (Cc
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
(RAILWAY BOARD)
ae —— New Delhi, dated °% .08.2008
onst.),
South Central Railway,
Secunderabad.
newly-converted Mudkhed (Km 0.00)- Kinwat
lectrified BG single line, a part of Mudkhed-
Nanded division, South Central Railway for
d goods traffic.
Sub: - Opening of
(Km 116.77) non-¢
Adilabad section of
public carriage of passengers an.
RH
Please refer to the Board’s letter of even number dated 22.06.07. The
regarding the action taken on the CRS’s
/suggestions is still awaited.
The. matter.has. already got badly delayed. It is, therefore, requested that
parawise remarks against the relevant para may be furnished to Commissioner
of Railway Safety endorsing copy to Board office for communicating the
approval of the Board for the opening of the above section for public carriage of
passengers.
: Te oo
(T.Gupta )
compliance
recommendations
ector, Civil Engineering (G) Exec.Dir
~- Gey - (Railway Board).
> yf
PY
ayo)
e3
i)
w)
.)
yoo”.
’ ‘ v) a)
YOM)
VO OY
d )
SWNo “Gg r ~ nn =—"
AS
Maa Qacty GOVERNMENT OF INDIA 2a dara MINISTRY OF RAILWAYS
(yar ra ais RAILWAY BOARD )
No. 2008/CEDO/ SR/04 os New Delhi, dt .11.08. 2008
Executive Director Stds. Track
RDSO, Manak Nagar, Lucknow.
Sub: Condonation of infringements for modified container flat bi-level auto car carrier wagon.
Ref: (i) Your office letter No CT/Contr/BG/MG, dt. 11.3.08 (ii) ED Stds.(Wagon)/RDSO letter No. MW/Auto Rack ,dt.26.6.08
With reference to your application referred at (i) above, sent through the CCRS, Lucknow, the sanction of Ministry of Railways, Railway Board is hereby communicated for condonation of the infringements to the clauses 2(ii),11, 14,29 & 30 of Chapter IV-A, of Indian Railways Schedule of Dimensions 1676mm Gauge (BG) Revised,2004 as per details shown in Annexure-I and drawings enclosed with your above mentioned letters.
The sanction is further subjected to the recommendations /suggestions made by CCRS/LKO vide his letter No. @4,17012/03/2008- aft dated 22.04.2008 and with Board’s comments as under:
(i) It is desirable that RDSO follow, as a norm, a uniform practice of processing clearance based on “ kinematic envelopes”.
Wott ef TD,
(T. Gupta) Executive Director, Civil Engg. (G)
Railway Board.
No. 2008/CEDO/ SR/04 New Delhi, dt .11.08. 2008
Copy forwarded for information to: CCRS, Compound of DRM/NER, Ashok Marg, Lucknow -226001 w.r.t. his endorsement No. #37.17012/03/2008- aoftro dated 22.04.2008
. ta Tee Min‘: ¢ Railways
oy
ay f), aunt ts ‘i, f "8 |
«ee -.
| gett? OY
: “jqnature to
are att Bae ef gue PEAR TR ete es: CREE eG EEE
CADocuments and Settings\Administrator\ Desktop\GM-NR-Auto -bi-tevel.dec a
Jo DOM
OO AdI
OOD ODF)
) PIO
IIO
DONO
IVOAIVO
YD YY GE *.2 eos:
t 4 GOs
Wad atychly GOVERNMENT OF INDIA
Sul Qe diaea MINISTRY OF RAILWAYS eftioé Ree @rS RAILWAY BOARD ) - ae ’
- ) \ \
No. 2008/CEDO/ SD/10 New Delhi, dt. 12.08.2008
The General Manager(Engg). Northern Railway, HQ. Office,
New Delhi
Sub: Condonation to infringement of track centres and clearance under ROBs at New Delhi Station Yard in
c pection with remodeing of New Delhi Yard of Delhi
KKK
Railways, Railway Board is hereby communicated for Condonation to infriigement of track centres and clearance under ROBs at New
Delhi Station Yard in connection with remodelling of New Delhi
Yard of Delhi Division of Northern Railway as shown in Form-XVII
and Plan enclosed with above referred application.
4 ‘ LL
(T. Gupta) mre Executive Director, Civil Engg. (G)
Railway Board,
No. 2008/CEDO/ SD/10 New Dethi, dt. 12.08.2008
Copy forwarded.for information to: -
(i) CCRS, Compound of DRM/NER, Ashok Marg, Lucknow -226001 w.r.t.
his endorsement No. Q.11014/03/2008-TW dated 08.08.2008.
(ii) C.R.S./Northern Circle, CRIS Complex, Chanakyapuri, New Delhi-21
"wart. his letter No.2007/Q-11/Inf./NC/202-604 dt.07.08.2008.
“2
Taney, (T. Gupta) for Secretary, Railway Board.
«a
Rash
Sisiae g § ee with Bees
6)
> IDQOIOVIDVIOYDOD))
e v Gn GOVERNMENT OF INDIA
* MINISTRY OF RAILWAYS {RAILWAY BOARD).
No.2005/CEDO/ORI/24 or New Delhi, dated \S.08.2008 4 4
The Chief Engineer/ Con/Il,
Eastern Railway, Kolkata.
Sub: -Opening of Railway- Doubling (Length 13.37 Kms) - Sainthia and Ahmadpur Stations- Bolpur-Khana Section -Howrah Division-Eastern Railway- Report of Inspection prior to opening for public carriage of passengers by the Commissioner of Railway Safety, Eastern Circle, Kolkata. -
Ref: - Your letter No. CAO/ CON vf W/1998/CRS Pt 9 dated
31, OT. 08.
With refererice to your ‘letter reférred ‘above, comphance: for observations given in the CRS/Eastern Circle inspection report dated 10.05.05 for the items numbered as 6.2(i), 8.2(vi), , 8.2 (xiii), 8.3{iv), 9. a(i), 9.4(ii}, 9.5(i), 9.5(ii}, 11.7, 16.3(vii), 16.6 and 17.1 is not satisfactory.
You are “requested to ‘take necessary action to comply with above
observations. : +
The action taken on different item recorded in juxtaposition to the above para’s may also be furnished-to-CRS? Eastern Circle endorsing a copy to this office.
a ee ( T. Glupta )
.. /C- Exec. Director, Civil Engineering (G) 4... {Railway Board).
ate: oF Radlwege alot a one ;
Rass . afk
a Lek arth _ | q 9
eee:
D ag
YOOEY
CIO DY
DYN FD DAL
),
Cy
i )
toa
YFQOONOVAOIO
OM OD.)
Sy
Of? aaa ataety GOVERNMENT OF INDIA OE et sare MINISTRY OF RAILWAYS (aaa arS RAILWAY BOARD )
No. 2007 /CEDO/SD/0. .
at
New Delhi, dated 80.08.2008
The Executive Diréctor (Track) RDSO,Manak Nagar Lucknow.
Sub: IR Schedule of Dimensions 1676 mm Gauge(BG) Revised,2004
enase
EDRE Railway Board has moved a proposal for issuing correction slip in IR SOD BG Revised,2004, in connection with adopting standard implantation for electrical works. { copy of relevant papers enclosed} You may therefore examine: the same and send the case with your
comments/recommendations to Board for further necessary action .
: oe Encl: As above.{20 PARES) | ‘ J t~
, ( T.Gupta )
Executive Director Civil Engg.(G} Railway Board.
-aLp— .. see ate sre trem NER is ey
Ministry of Raihways 3 ar
a 4 2)
MY
DAD
AD
OD
OY
Pad
tyra
Ody)
a)
Yoo
NO
cory
’ x POD
OM
DY oD
“ GF
)
gia ata GOVERNMENT OF INDIA 37 Qa sacra MINISTRY OF RAILWAYS
(ear Ws RAILWAY BOARD )
No .2006/CEDO/ORI/48. New Delhi, dated 21.08.2008
The Chief Commissioner of Railway Safety, RM NER Compound, Ashok Marg,
Lucknow-226001 .
Sub:Opening of newly constructed BG line from Eklakhi station to Kumargang station (Km 6.414) in connection with Ek lakhi-Kumargang Patch doubling project in Katihar division of NE Railway for Public Carriage of Passengers .
Ref:(i) CCRS’s Letter No.R.12026/1/06-CCRS,dt 14/11/2006 (1i)CRS/NFCircle /Kotkata letter No.R. 12026/2/2006/547 ,dt 10/10/06
With reference to your endorsement No. R.12026/1/06-CCRS,dt 14/11/2006, the approval of Ministry of Railways is hereby communicated to the recommendation of Commissioner of Railway Safety, NF Circle/Kolkata for opening of the above section for public carriage of passenger as per his letter No. R.12026/2/2006/547,dt 10/10/06
LF
( T.Gupta ) Executive Director Civil Engg.(G)
Ral lway Board.
No.2006/CEDO/ORI/48. New Delhi, dated 21.08.2008
Copy forwarded for information to: . (i)The Commissioner of Railway Safety, NF Circle, 14,STRAND ROAD(12" floor),
KOLKATA-700 001 ,w.rt. his letter No R.12026/2/2006/547 ,dt 10/10/06 (ii)The Chief Engineer /Con-6,NF Railway ,Maligaon, Guwahati-781011.
( rdpte) for Secretary, Railway Board.
=
"UIT Ds mn anserneusancrwinene ns seen Vencavas
WE RG
|
ry
ey
Daye)
‘) )
ry
tyes
oy
rp
_ 4A
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS
(RAILWAY BOARD)
NO. 2008/CEDO/SM/1 New Delhi, dated 25.8.2008
The General Managers (Engg)
North Central Railway, N.F, Railway, North Western Railway, SEC Railway & Western Railway.
Subject:- System Maps
Reference: This office letter No. 92/CEDO/SM/1 dated 11.2.1992,
16.11.2007 & 4.8.2008.
As per letter dated 11.2.1992, the System Maps updated and corrected as on 31™ March 2008 of your Railway were to reach Board’s Office by 31° July 2008 but it is seen that same is still awaited from your Railway despite reminder dated 4.8.2008.
You are again requested to send 25 copies each of the coloured System Maps of Size A-0 (duly folded neatly in a cover), 25 copies of Size A-4
and 10 copies of the Time Table Maps(Five Plain and Five Showing the Divisional Jurisdictionjup dated and corrected as on 31.3.2008 to Board’s Office latest by 5.9.2008 because it is frequently required by MR’s Cell and Board Members for their use and reference.
It may please be ensured that the System Maps have been prepared strictly in accordance with instructions contained in the letter quoted above. Also in
future, you are requested to send these maps to Railway Board by 31” of July every year.
hers) Encl :- As above CT. PTA) Executive Director Civil Engg (G)
Railway Board.
Copy :~ Principal Chief Engineers - NCR, NFR, NWR, SECR & WR for information.
amare z+! Paiways
7 oft
CAUsers\deli\Desktop\GENERAL DOCUMENTS OF CEDO BRANCH-1.doc
Xz 33 ae YY a
GOVERNMENT OF INDIA
~ - MINISTRY OF RAILWAYS a (RAILWAY BOARD) w™
~ By Fax 0522-2626608 A
_ No. 2008/CEDO/ORI/1 New Dethi, dated 2.9.2008
es . . o
: The Chief Commissioner of Railway Safety, ro DRM NER Compound, Ashok Marg,
“ Lucknow — 226001. a
~ (Kind attention:- Shri Sanjay Tripathi, Dy CRS(optg))
~ Subject:- Opening of New Down Main Line Broad Gauge Section after doubling between Jasra Station to Madraha Station of
2 Jhansi Division of North Central Railway for Public ~ Carriage of Passenger traffic.
_ Reference:- CRS’s(North Eastern Circle) letter No. 700/1/D/OPG/PT/JHS/ . 1285 dated 10.12.2007 addressed to Secretary, Ministry of Railways, - through CCRS/LKO.
o~ ~
cf Vide above letter, CRS, NE Circle has forwarded the Inspection Report of the above
> line after opening for passenger traffic to Secretary, Ministry of Railways/Railway Board
a and has been received in this office.
_ However, the forwarding note of CCRS/Lucknow recommending the same has not
~ been received along with the above letter.
~ You are requested to kindly send a copy of the CCRS forwarding letter to Board’s _
~ office and if not sent earlier, the same may be forwarded now to enable the Ministry of a . . oP . - Railways to sanction the apSHg Akg sot
“2 uf 2—
> (T.GUPTA)
oO Executive Director Civil Engg (G)
Railway Board i —s
“) * Copy to:- CE/Con, NC Railway for information by Fax — 0532-2560053.
o
2
2
> 226
im CAUsersideH\Desktop\GENERAL DOCUMENTS OF CEDO BRANCH-1 doc
a
nn 4 be Mad age GOVERNMENT OF INDIA Rat Sait MINISTRY OF RAILWAYS
(Aaa AS RAILWAY BOARD )
c
ae x ep
Ty
Sy 3
No. 2008/CEDO/SR/20 oO New Delhi, dated 04 .09. 2008
The General Manager(Engg), Northern Railway, Baroda House, New Delhi.
Sub:Running of J&K DEMU stock fitted with all coit bogie on the Kakpora-Budgam section of Udhampur-Srinagar- Baramulla Rail Link (USBRL) Project.
Ref: Your office letter No. 519-W/924/USBRL,dt:25.10.2007
In reference to above letter, the sanction of the Ministry of Railways, Railway Board is hereby communicated for Running of J&K DEMU stock
. fitted with all coil bogie on the Kakpora-Budgam section of Udhampur- Srinagar- Baramulla Rail Link (USBRL) Project subject to terms and conditions as. given in RDSO’s Final Speed Certificate and Northern Railway’s Joint Safety Certificate, Track Certificate and other Certificates accompanying above referred letter along with Board’s ‘comments as under:
(i) Maximum Permissible Speed be limited to 90 Kmph for first year.
. ( T.Gupta ) er Executive Director Civil Engg.(G)
Railway Board.
No. 2008/CEDO/SR/20 New Delhi, dated 04 .09. 2008
Copy forwarded for information to:
1. CCRS, Compound of DRM/NER, Ashok Marg, Lucknow -226001 w.r.t. his
endorsement No. @g.17015/01/2004- gra.vat.dt. 30.7.08 & 14.8.08 2. The CRS/Northern Circle, CRIS complex, Chanakyapuri, N.Delhi-21 w.r.t.
his letter No. Q-12(13)HPDMU/05-06/NC/981-982 ,dt.13.11.2007
* 4 MOO
0 97.)
O QIVAOIONOIND
DA .AON
ONS?
“
tN
~ 3. The Executive Director Standards (Motive Power), RDSO, Lucknow, w.r.t. his letter rm . No. MC/RLCID, dt. 02/08/2007.
t7 ) ew sy Mir ory oi cage
“ a va ag *~ Ferrey blatd
(7.G pta) “Weave oy arly OO CO for Secretary, Railway Board. Oana was Licesure yy
Signature ..... 2...
:
<a a rate TTT aes 24 coe napene nee \
Dete of Issue... AA “_
sot eens
~ .
~
5 i)
) i
a)
QOD
OD VY
Id
DH
5 art eS ee GF
oe lof
o GOVERNMENT OF INDIA MINISTRY OF RAILWAYS
(RAILWAY BOARD)
No. 2007/CEDO/ORI/39. New Delhi, dated3, .09.2008
The Chief Commissioner of Railway Safety, DRM NER Compound, Ashok Marg, Lucknow-226001. ‘
Sub: Opening of new Dn main line BG section after doubling between Manikpur station and Katayadandi section of Jhansi division of NC Railway for public carriage of passenger traffic,
Ref; (i) CCRS’s Letter No. R. 12025/01/2007-TW dated 08.05.07 (ii)CRS’s. (North. ._Eastern Circle) letter No. 700/1/OPG/P.T./JHS/1907 dated 22.03.07
seene
With reference to your endorsement No. R. 12025/01/2007-TW dated 08.05.07, the approval of Ministry ofRailways is hereby communicated to the recommendation of Commissioner of Railway Safety, North Eastern Circle, Lucknow for opening of the above section for public carriage of passengers as per his letter No. 700/1/OPG/P.T./JHS/1907 dated 22.03.07.
(a capt (Tv. » &/, Executive Director Civil Engg.(G) *
Cc Railway Board.
No. 2007/CEDO/ORI/39. . New Delhi, dated 2\, .09.2008
Copy forwarded for information_to: een (i) The Commissioner of Railway Safety, North Eastern Circle, Hazratgani,
Lucknow-226001, w.r.t. his letter No. 700/1/OPG/P.T./JHS/1907 dated 22.03.07.
(ii) The Chief Administrative Officer (Const:); North-Central Railway, Allahabad. (iii/The General Manager (Engg), North Central Railway, Allahabad.
oe
( T.Gupta )} for Secretary, Railway Board.
Raaas ; Air tasue Wid 4
Tere ae
eyqgnature -"e wit at ats
fom of Mae Sf
{OZ
GOVERNMENT OF INDIA — MINISTRY OF RAILWAYS
° (RAILWAY BOARD} o
“ No. 2004/CEDO/ORI/7. New Delhi, dated 3\ .09.2008 mo . .
A The Chief Commissioner of Railway Safety, ~~ DRM NER Compound, Ashok Marg, ” Lucknow-226001.
oO Sub: Opening of the newly restored Ankleshwar-Rajpipala NG o> section to a length of 62.80 Km (from Km. 0.00 to Km. ~ 62.80) on Vadodara Division of Western Railway.
om
~ Ref: (i) CCRS’s Letter No. R. 12020/04/2003-RS dated = 03.10.03
om (ii)CRS’s (Western Circle) letter No. R-13011 /417/H . dated 03.09.03
a ; ° With reference to your endorsement No. R. 12020/04/2003-RS dated ~ 03.10.03, the approval of Ministry of Railways is hereby communicated to the A recommendation of Commissioner of Railway Safety, Western Circle, Mumbai ~ for opening of the above section for public carriage of passengers as per his a letter No. R-13011/417/H dated 03.09.03.
Ct — rm ( T.Gupta ) ~ C_ Executive Director Civil Engg.(G) a ' mo Railway Board. ,
o No, 2004/CEDO/ORI/7. New Delhi, dateda\ -09.2008 to
~ Copy forwarded for information to: (i) The Commissioner of Railway. Safety,Western_Cirele,20¢-Floor,-Churchgate
mn Stn. Bldg. Annexe, M.K. Road, Mumbai-400020, w.r.t. his letter No. R- 13011/417/H dated 03.09.03.
™ (ii} The Chief Administrative Officer (Const.), Western Railway, Churchgate, ~ Mumbai. :
(iii)The General Manager (Engg), Western Railway, Churchgate, Mumbai. a \ oO .
a J ee
co ( T.Gupta ) - for Secretary, Railway Board.
o
co
mo
a
P
OD
tc
2 f/ ”
yaryary
PDA
SSIs
Vey
7 +)
oA
MA
DP
UD
UD
4 7
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS
(RAILWAY BOARD) No. 2007/CEDO/ORI/57. / New Delhi, dated 24.09.2008
The Chief Commissioner of Railway Safety, DRM NER Compound, Ashok Marge, Lucknow-226001. ‘
Sub: Opening of new BG Dn main line after doubling between Idratganj and Jasra stations of Jhansi division of North Central Railway for public carriage of passenger traffic.
Ref: (i) CCRS’s Letter No. R. 12025/05/2007-TW dated 30.05.07 (ii)CRS’s (North Eastern Circle) letter —No. 700/1/C/OPG/P.T./ JHS/162 dated.20.04.07
seene
With reference to your endorsement No. R. 12025/05/2007-TW dated 30.05.07, the approval of Ministry of Railways is hereby communicated to the recommendation of Commissioner of Railway Safety, North Eastern Circle, Lucknow for opening of the above section for public carriage of passengers as per his letter No. 700/1/C/OPG/P.T./JHS/ 162 dated 20.04.07.
{ T.Gupta ) (_ Executive Director Civil Engg.(G) Bo Sm , ‘Railway Board.
No. 2007/CEDO/ORI/57. _.. New Delhi, dated) .09.2008 Copy forwarded for information to: (i) The Commissioner of Railway Safety, North Eastern Circle, Hazratganj,
Lucknow-226001, w.r.t. his letter No. 700/1/C/OPG/P.T./JHS/162 dated 20.04.07.
(ii) The Chief Administrative Officer (Const.), North Central Railway, Allahabad. (ili)The General Manager (Engg), North Central Railway, Allahabad.
ul
( T.Gupta ) for Secretary, Railway Board.
6.F iB
bperyey
a)
‘)
Pye
‘ FOO
QAI
ODdD,
2 0/8
. wT aa . L 2 ee on Cra 7
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS
(RAILWAY BOARD) No, 2003/CEDO/ORI/7. New Delhi, dated), .09.2008 The Chief Commissioner of Railway Safety, DRM NER Compound, Ashok Marg, Lucknow-226001. ‘
Sub: Introduction of 25 KV AC 50 cycle single phase electric traction in Chengalpattu excl.) -Villupuram (incl) BG section from LOC No. B. 61/8 (Km. 61/208.30) to LOC No. B 163/34A (Km. 163/ 882,55) in Chennai Division of Southern Railway.
Ref: (i) CCRS’s Letter No. R. 12047/1/2003-RS dated 25.02.03 {ii)CRS’s (Southern Circle) letter No. R. 12047/1/2002/ SR dated 27.01.03
voces
With reference to your endorsement No. R. 12047/1/2003-RS dated 25.02.03, the approval of Ministry of Railways is hereby communicated to the recommendation of Commissioner of Railway Safety, Southern Circle, Bangalore for energisation and introduction of electric traction of the above section for passenger service as per his letter No. R. 12047/ 1/2002/ SR dated 27.01.03.
trdaptny on fe. Executive Director Civil Engg.(G)
Railway Board.
No, 2003/CEDO/ORI/7. ao ~----. New Delhi, dated 3 .09.2008
Copy forwarded for information to: (i) The Commissioner of Railway Safety, Southern Circle, 7, Seshadri Road,
Gandhinagar, Bangalore-560009, w.r.t. his letter No. R. 12047 /1/2002/ SR dated 27.01.03.
(ii} The Chief Electrical Engg., Southern Railway, Chennai. (iii)The General Manager, Southern Railway, Chennai.
of “2. ——
( T.Gupta ) for Secretary, Railway Board.
[of
N. Youd
7)
a)
) a
/
DDD Ysa)
) é)
DUP
EFA
DD
DDD DD
YD
v2 Ase as . \e C x Coe GOVERNMENT OF INDIA
wv MINISTRY OF RAILWAYS (RAILWAY BOARD)
No. 2006/CEDO/ORI/4. New Delhi, dated 7\ .09.2008,
The Chief Commissioner of Railway Safety, DRM NER Compound, Ashok Marg, Lucknow-226001. ,
Sub: Report on inspection prior to opening of Barsoi- Radhikapur (54.42 Kms). section converted into BG, a part of Katihar-Jogbani including Katihar-Barsoi and Barsoi-Radhikapur (195.48 Kms) gauge conversion project in Katihar division of NF Railway for public carriage of passengers.
Ref: (i} CCRS’s Letter No..R. 12036/02/2006-CCRS dated 24.03.06 (ii)CRS’s (N.F. Circle) letter No. R-12036/9/2005/942 dated 10.02.06
eacne
With reference to your endorsement No. R. 12036/02/2006-CCRS dated 24.03.06, the approval of Ministry of Railways is hereby communicated to the recommendation of Commissioner of Railway Safety, N.F. Circle, Kolkata for opening of the above section for public carriage of passengers as per his letter No. R-12036/9/2005/942 dated 10.02.06.
lo ,
( T.Gupta ) _ __ _-txecutive Director Civil Engg.(G)
Railway Board.
No. 2006/CEDO/ORI/4, - een nn __New Delhi, dated 2) .09.2008
Copy forwarded for information to: (i) The Commissioner of Railway Safety, N.F. Circle, 14, Strand Road, (12th
Floor), Kolkata-700001, w:r.t. his ‘letter No. R-12036/9/2005/942 dated 10.02.06.
(ii) The Chief Administrative Officer (Const.), N.F. Railway, Maligaon, Guwahati. {iii)The General Manager (En .F Railway, Maligaon, Guwahati.
uv a
( T.Gupta ) for Secretary, Railway Board.
om
Avs ?
PPO IIOOGADIO
DD
FD
dD
DODY72Y
7D FD
Dd.
Yd.
YD
DED
GOVERNMENT OF INDIA us x zB MV SARIN NE RIN ESE
‘ cn MINISTRY OF RAILWAYS (RAILWAY BOARD)
No. 2006/ CEDO/ ORI/24. New Delhi, dated .09.2008
The Chief Commissioner of Railway Safety, DRM NER Compound, Ashok Marg, Lucknow-226001.
Sub: Report on inspection prior to opening of Salakati- Basugaon Dangtal-New Bongaigaon (19 Km) section converted into broad gauge in Alipurduar division and Rangiya division, a part of New Jalpaiguri-Siliguri Jn-New Bongaigaon (280 Km) gauge conversion project in Katihar/ Alipurduar/ Rangiya division of NF Railway for public carriage of Passengers.
Ref: (i) CCRS’s Letter No. R. 12036/01/2006- CCRS dated
12.01.06
(iiJ}CRS’s (N.F. Circle) letter No. R-12036/8/2005/677
dated 08.12.05
With reference to your endersement No. R. 12036/01/2006-CCRS dated 12.01.06, the approval of Ministry of Railways is hereby communicated to the recommendation of Commissioner of Railway Safety, N.F. Circle, Kolkata for opening of the above section for public carriage of passengers as per his letter R-12036/8/2005/677 dated 08.12.05.
fa Po ae tee . bee : - . : a
To {( T.Gupta )
Executive Director Civil Engg.(G) Railway Board.
No. 2006/CEDO/ORI/24. New Delhi, dated)\, -09.2008
Copy forwarded for information to: (i) The Commissioner of Railway Safety, N.F. Citete: T4, Strand Road, (12%
Floor) Kolkata-700001, w.r.t. his letter No. R-12036/8/2005/677 dated 08.12.05. ;
(ii) The Chief Administrative Officer (Const.), N.F. Railway, Maligaon, Guwahati. (iii)/The General ‘Manager (Engg), N.F-. ‘Railway, Maligao, Guwahati.
ee
( T.Gupta ) for Secretary, Railway Board.
inistry M ta
: Railway Svar
aan ase F ae with Enclosure,
Fe
4 One
eee peo meee
lk Zh ah Fa! Fo Date of Igsue me
erry
iD
J SVIIIIOIOANIAAOY
A IW
IINO
N DIDDY HYD
III DIIDIN
No. 2007 /CEDO/ORI/43.
No. 2007/CEDO/ORI/43. New Delhi, dated‘) .09,2008
The Chief Commissioner of Railway Safety, DRM NER Compound, Ashok Marg, Lucknow-226001. °
Sub: Report of opening of new Up main line between Bale - Pakni section for public carriage of passengers.
Ref: (i) CCRS’s Letter No. R. 12011/02/2007-TW dated 03.07.07 (ii)CRS’s (Central Circle) letter No. C 12(143)/2007/H- 267 dated 15.06.07
With reference to your endorsement No. R. 12011/02/2007-TW dated 03.07.07, the approval of Ministry of Railways is hereby communicated to the recommendation of Commissioner of Railway Safety, Central Circle, Mumbai for opening of the above section for public carriage of passengers as per his letter No. C 12(143)/2007/H-267 dated 15.06.07.
oT teV7n
{ 1 dupta ) ¢_- Executive Director Civil Engg.{G)
Railway Board.
New Delhi, dated=\ 09.2008
Copy forwarded for information to: (i) The Commissioner of Railway Safety, Central Circle, 294 Floor, Churchgate
Stn, Bldg. Annexe, M.K. Road, _Mumbai-4.00020 we.er.t.. his. letter No. C 12(143)/2007 /H-267 dated 15.06.07.
(ijJThe Chief Administrative Officer (Const.), Central Railway, New Administrative Building, Dadabhai Naoroji Road, Mumbai CST-40001.
(iii/The General Manager (Engg), Central Railway, Mumbai.
CF Wer ey . Mi a inistry Of Ra;
nett ( T.Gupta } Sarin ae a fren for Secretary, Railway Board.
SL
ve eee OF 4 ; “7 A GOVERNMENT OF INDIA (02
MINISTRY OF RAILWAYS
(RAILWAY BOARD)
PIO
DIOFOI9D9
INDIO
D9 I9H9IN9I97I9ODDD
2 oO
XS
) 3%
oO)
) é \
*y
TI
108
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS
(RAILWAY BOARD) Lf
No. 2008/CEDO/SR/21 New Delhi, dated /3.10.2008
The Director General(Track)
RDSO Manak Nagar, i Lucknow.
Subject:- Movement of ODCs
Reference:- Railway Board’s letter No. 82/WDO/ODC/1 dated 14.9.1982,
Vide above referred letter, movement of ‘B’ Class ODC was permitted during Night
hours also subject to certain conditions stipulated in Para 4(A)(ii).
However, the “Compendium of Instructions on Rules for ODC movement (ESO-13)
issued by the Railway Board in February 1999 does not contain the circular No.
82/WDO/ODC/1 dated 14.9.1982.
The “Compendium of Instructions (ESO-13) stipulates only two letters for movement
of ODC viz, .
(i) 64/WDO/ODC/6 dated 11/12-7-1967
Gi) 8IVWDO/ODC/1 dated 29-4-1981
These letters do not clearly stipulate the movement of ‘B’ class ODC during Night
hours.
You are requested to kindly clarify regarding the movement of ‘B’ class ODC’s so
that comprehensive instructions are issued to the Railways if required.
Q Ce
@ Wey MiniNry oF Retlwayy (T. GUPTA )
wa ate Executive Director Civil Engg(G) nt oN Board :
Afar writ Railway Board. aT
foune vw Bis
Signature... wrey at tai vo pel.
Date of Issue... | |
2
227 CaAtcrsldell Doak op\GINERAL DOCUMENTA OF CDQ DRANCH:1 doe t t
yo... 909979399790920
d
JQVDDFDF?IDDDDIDD 9
No.2007 / CEDO/ORI/37
OF 103
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS
(RAILWAY BOARD)
New Delhi, dated ]£ .10.2008
The Chief Administrative Officer/ Con.,
N.E. Railway, Gorakhpur.
Sub: Opening of BG double-lien (Dn line) Gonda Jn.- Maijapur
section (17.7 Kms) of Lucknow division of NE Railway for
goods and passenger traffic.
Ref: Your letter No. W/Con/520/1/MIR-GD/W-1/3185 dated 03.10.08. »
ERK
With reference to your letter referred above, compliance for observations
given in the CRS/North Eastern Circle inspection report dated 02.08.2000 for
the item numbered as 8.2(iii), 8.2(iv), 8.2(vi), 10.1 & 12.2 is not satisfactory.
You are requested to take necessary action to comply with above
observations.
The action taken on different item recorded in juxtaposition to the above
para’s may also be furnished to CRS/North Eastern Circle endorsing a copy to
this office. ,
‘ i a
- { T.Gupta )
Exec.Director, Civil Engineering (G) (Railway Board).
Ministry *4! me tf
Railway ifr qaatas aera Je
Issue with Enel vine
aearer aaa ie Wate of [sata ene are 1
3 yD
399002
dX J
3 >
399
9D ) 1
yOVIDIDININIIIDAYP
19
GOVERNMENT OF INDIA
MINISTRY. OF RAILWAYS
(RAILWAY BOARD)
No.2007 /CEDO/ORI/12 ‘New Delhi, dated | £ .10.2008
The Chief Administrative Officer/Con.,
N.E. Railway, . Gorakhpur.
Sub: Opening of new Dn main line BG section after doubling
between Mankapur station and Gonda Jn station of
Lucknow division of NE Railway for public carriage of
passengers.
Ref: Your letter No. W/Con/520/1/MUR-GD/W-1/3181 dated
24.09.08. KRER
With reference to your letter referred above, compliance for observations
given in the CRS/North Eastern Circle inspection report dated 24.04.07 for the
item numbered as 11.8 is not satisfactory.
You are requested to take necessary action to comply with above
observations.
The action taken on different item recorded in juxtaposition to the above
para’s may also be furnished to CRS/North Eastern Circle endorsing a copy to
this office.
wo ( T.Gupta )
Exec.Director, Civil Engineering (G)
(ee eo (Reilway-Board).—----—--—
1
e nately Ministry Of R aaa
Railway Board
aaamaa afga writ Issue with Enclesure
TSEZ Shgnatare we vr csreee neem
arr ot fafa Date of ISBUG 0. were se
t
OVO
IIMWIDID.FRDIPIMIIIID
ID
IAD
DA PAP
IVP
Tae yee : ae Riot cee
orga ara GOVERNMENT OF INDIA Ja dslera MINISTRY OF RAILWAYS
(era Ars RAILWAY BOARD )
No. 2007/CEDO/SD/0. New Delhi, dated 17.10.2008
The Executive Director (Track)
RDSO,Manak Nagar
Lucknow.
Sub: IR Schedule of Dimensions 1676 mm Gauge(BG) Revised,2004
North Central Railway vide their letter No. 261-W/ODC/NCR/2 dated
23.11.2007 ( Annexure-l) have brought out the discrepancy in SOD Revised,2004
as follows:
For posts carrying electrical conductors,Para 11(iii)(b) of the old “ SOD”
specified as :- _
(iii) The minimum horizontal distance measured at right angle to and :
from the centre of the nearest track to any part of a rigid and well
founded post, its fitting and projections carrying Electrical
Conductors:
(b) from 305mm.(1ft.0 in.) above rail evel to 4420 mm. (14 ft. 6 in) 2135 mm.
above rail level (7 ft. Oin)
For telegraph posts Para 9 of the old “ SOD’ specified as:
9. Minimum horizontal distance of any telegraph post The height of post plus
measured from the centre of , and at right angles to, 2135 mm . (7ft.0 in)
the nearest track . However for structure carrying electrical conductors the IR SOD (BG)
Revised,2004 , para 11(iv) specifies as:
fiv) The minimum horizontal distance measured at right angles from the centre of |
nearest track to structure carrying electrical conductors crossing a railway shail |
be equal to height of structure in metre above ground level plus 6m.
Since Transmission Towers carrying HT wires are well founded, designed
and require considerable time & funds to shift therefore the Rly has requested to
modify the SOD, Revised ,2004 for such H.T. towers, which may be permitted at a
minimum horizontal distance of 2.35 meters from the centre of the nearest track.
You may therefore examine the same and send the case to Board with RDSO’s
comments/recommf ssary action .
“Tay
(T.Gupta ) Executive Director Civil Engg.(G)
Railway Board.
Ministry Of Railways tne ate
allway Board
Encl: As above. a e afer ort lug with Enclosure
Tat ‘ ature \. Perr or Te
Saw
earet at fa Copy to:- Of LUO sess cesertes sesomecses oe
4) Principal Chief Engineer, North Central Railway, Subedarganj, Allahabad-
211033 wrt. his letter no. 261-W/ODC/NCR/2 dated 23.11.2007 , for
information .
4>.390O79079997979979909
2 c es — . saree LS) >.-
ay :. LET atte Section itd % Pepe © NO? :
. \ " -_——
On NORTH CENTRALRAILWAY Headquarters office -
o~ Allahabad.
_ No. 261-W/ODC/NCR/2
™~ o/ _ Addl. Member (Civil Engg.)-
a of ailway Board
raga ae a
.
x!
a (Rail Bhawan Sle |
Ai\\ New Delhi ww ry .
oO Sub: Modification of schedule dimension chapter | item No. 11( IV)
-
Para 11 (iii) (b) of the old “Schedule of Dimensions” specifies a
horizontal clearance of2135"tnm (7feet) from the centre of the
nearest track for well-founded posts carrying electrical conductors.
For telegraph posts, this distance had been specified as height of
ihe post plus 2135 mm (7 feet) in the old “Schedule of Dimensions”.
} )
In terms of para 1.1 -{iv)..ofstae-new. “Schedule-of.. Dimensions",
for all structures carrying electrical conductors, the minimum
horizontal distance from the centre of the nearest track has been
specified as “Height of the structure in meters plus 6 metersini-..
a,
Transmission towers carying H.T. wires are well founded and
are generally erected on pile foundations. Moreover, the |
"transmission towers for HT. wires are well designed and are not likely
to fail. The shifting of these towers requires a considerable time
close to a year if not more. Such a situation contributes to time over
runs for the projects. It also requires huge sum of money at times
running into crores.
It is, therefore, felt that we may modify the “Schedule of
Dimensions” in respect of H.1, towers to permit them.at.a minimum horizontal distange of-236meters fram the ceénfre:of the nearest track. However, the siructures carrying LT. wires shifting of which _
does. not demand much time or money, may continue jo be
governed by the stipulation of para 11 (iv) new “Schedule of
Dimensions”. weer Se
oe +s wlo>
(S.K.Malik)
poo Prinelpal Chief Engineer
wget
| a Wee Sas
tA
| gq 13 nr Py { wr Reminder-I io. . ans
Haat BAaeeHTse GOVERNMENT OF INDIA | aa dare MINISTRY OF RAILWAYS
(aa BS RAILWAY BOARD ) ‘
SC
yoy
DI9090 0399939779772
3939 9979999 FD 9 9 9D
No. 2007/CEDO/SD/0. New Delhi, dated 17.10.2008
The Executive Director (Track) RDSO,Manak Nagar
Lucknow.
Sub: IR Schedule of Dimensions 1676 mm Gauge{BG) Revised,2004 Ref: Board’s letter of even No. dt. 16.07.08
Vide above referred letter the approval of Board( ML & ME} was conveyed
to RDSO for modification in SOD, Revised,2004 to cover the ACTM provisions.
Aliso RDSO was requested to issue addendum & correction slip no.4 to
SOD Revised,2004 which has not yet been issued.
Kindly arrange to get the needful done at the earliest.
we oo
( + dapta Executive Director Civil Engg.(G)
ele Railway Board.
Taq AFAIAT -
| Ministey 3 of Bgivavey:
UR hw y oars 7 es faa mR
BEG wae
wear? ure - a Cae” nate of fae
a Ve
So
Jo
13s YOU RIIVIDIIIIIIIOIIIIVD
YD >I VIVID
) :
~ og
2
vA .P ae
vb 114
is GOVERNMENT OF INDIA
, MINISTRY OF RAILWAYS
(RAILWAY BOARD)
No. 2007/CEDO/ORI/33. New Delhi, dated 23.10.2008
The Chief Commissioner of Railway Safety,
DRM NER Compound, Ashok Marg,
Lucknow-226001.
Sub: Opening of BG Electrified Bye Pass Line between
Simhachalam North and Gopalpatnam RRI Block Cabin of
Waltair Division of East Coast Railway for public carriage
of passengers.
Ref: (i) CCRS’s Letter No. R. 12019/01/2007-TW dated
15.05.07
(ii)CRS’s (South Eastern Circle) letter No. R
12019/13/2007-SEC/358 dated 16.04.07
weno
With reference to your endorsement No. CCRS’s Letter No. R.
12019/01/2007-TW dated 15.05.07, the approval of Ministry of Railways is
hereby communicated to the recommendation of Commissioner of Railway
Safety, South Eastern Circle, Kolkata for opening of the above section for
public carriage of passengers as per his letter No. R 12019/13/2007-SEC/358
dated 16.04.07.
( T.Gupta }
ye Executive Director Civil Engg.(G) Railway Board.
No. 2007/CEDO/ORI/33. New Delhi, dated 23.10.2008
* .
Copy forwarded for information to:
(i) The Commissioner of Railway Safety, South Eastern Circle, 14 Strand Road,
(12th Floor) Kolkata-700001, w.r.t. his letter No. R 12019/13/2007-
SEC/358 dated 16.04.07.
(ii) The Chief Administrative Officer (Const.), East Coast Railway, Bhubaneswar.
{iii]The Ge Manager (Engg), East Coast Railway, Bhubaneswar.
(nabpta) for Secretary, Railway Board.
V2
yorDDOO VDDD
DDD
yt
J
TDD
DD YD
7039
ag
|
&
e Is
gearety ¥ anabure eeeeee
gS optee, ermpnardy OPTRA
i t
i eet
. “eilwaya
vw ar “VS
Wad Aah sy GOVERNMENT OF INDIA —
a sae MINISTRY OF RAILWAYS ,
(aa Brs RAILWAY BOARD )
No. 2008/CEDO/SD/11. New Delhi, dated 31.10.2008
/ i
The General Manager(Engg).
Southern Railway, HQ. Office,
Chennai-600 003 f
Sub:Electrification of Villupuram- Tiruchchirappalli
Section (Chord line) of S.Rly- Condonation of
infringements due to existing Engineering structures
(ROBs/FOBs) .
Ref:Your letter No.573/RE/5 ,at.16.05.2008
With reference to your above application sent through Chief
commissioner of Railway Safety, Lucknow, the approval of Ministry
of Railways, Railway Board is hereby communicated for adoption ‘of
lesser vertical clearances of existing Engineering structures
(ROBs/FOBs) for Electrification between Villupuram-Tiruchchirappalli
Section (Chord line) of Southern Railway as listed in Form-XVII
and shown in drawings enclosed with your above referred
eT
( » chete }
Executive Director Civil Engg. (GS)
Railway Board.
application.
No, 2008/CEDO/SD/11. New Delhi, dated 31.10.2008
Copy forwarded for information to:
(i} CCRS, Compound of DRM/NER, Ashok Marg, Lucknow —226001 w.r.t. his
endorsement No. Q.11017/05/2008-aoft®a dated 18.09.2008
(ii) C.R.S./Southern Circle, 7, Seshadri Road, Gandhinagar, Bangalore-560 009
w.r.t. his letter No.Q.11017/1/2008-09/5/SR/531 dt.30.06.2008.
er
(T.Gupta)
for Secretary, Railway Board
ahs
YO
¥
Lm GOVERNMENT OF INDIA. MINISTRY OF- RAILWAYS
(RAILWAY BOARD) —
“|
ys
“No. 95/CEDO/ORI/38. New Delhi, dated _4-11.2008
7 The Chief Commissioner of Railway Safety,
! DRM NER Compound, Ashok Marg,
Lucknow-226001.. C a Co . Sub: Opening of newly. converted 8G line between Ankai and
Aurangabad stations on Manmad-Aurangabad Section of a SC Railway for public carriage of Passengers.
Q Ref: (i) CCRS’s Letter No. RS-10-1(9}/92 dated 18.04.95 Ci (ii)CRS’s (South Central Circle) letter No. 6/S.C./20/40
; dated 05.05.92 Go . - ae
© With reference to your endorsement No. RS-10-T(9)/92 dated 18.04.95, ¢: the approval of Ministry of Railways is hereby communicated to the _. recommendation of Commissioner of Railway Safety, South Central Circle, \! Secunderabad for opening of the above section for public carriage of Ci) Passengers as per his letter No. 6/S.C./20/40 dated 05.05.92.
WO _ . ;
- ; “4 ~~ us _ ( T.Gupta ) | UU / Bzscutive Director Civil Engg.(G) <, ; Railway Board. NS.
(: No. 95/CEDO/ORI/38. New Delhi, dated 4-11.2008 c a!
Copy forwarded for information to: Cc) §yThe Commissioner of Railway Safety, South Central Circle, Secunderabad- _. © 900371, w.r.t. his letter No. 6/S.C./20/40 dated 05.05.92, \ (ii)The Chief Administrative Officer (Const.), South Central Railway, rm Secunderabad. \ (iii/The General Manager (Engg), South Central Railway, Secunderabad: -
wv
a
-. WJ
J "2 ‘
( T.Gupta )
___ for Secretary, Railway Board. _
Vy qe apa Ministry aa a
2. Pate. g
“A ,
WO i ee BY VS
o-
we
Signat.-,. BI « Data of fey, !
O
Q .
at
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS
(RAILWAY BOARD)
10.2006/CEDO/ORI/29 New Delhi, dated jo. 11.2008
‘he Chief Engineer, fetro Railway, folkata-700071.
: ‘ |
Sub: Opening of newly constructed BG single electrified line of 5.750 Km from Prinsepghat station (Km 13.026 from Dum-Dum Jn) to Majerhat station (Km. 18.776 from Dum Dum Jn) in connection with extension of circular Railway of Sealdah division of Eastern Railway executed by Metro Railway / Kolkata.
Ref: Your letter No. MRTS/G-300/21/CR Pt. 2 dated 17.10.2008.
ke RE
With reference to your letter referrecl above, compliance for observations ven in the CRS/Eastern Circle inspection report dated 22.02.2006 for the em numbered as 4.1, 9.3 & 14.1 (iii) is not satisfactory.
You are requested to take necessary action to comply with above dservations. i
The action taken on different item recorded in juxtaposition to the above ira’s may also be furnished to CRS/Eastern Circle endorsing a copy to this fice.
eat ete oO ou
. ( T.Gupta } ‘ , Exec.Director, Civil Engineering (G)
° (Railway Board}. i
eran: a tor manansene (ARI
TI SLT , Mini hy soeya i
a ve ad . pe fort De .
Rear: Signature renee eeeeer) :
wey Aa FOE . ato ob fea
& Ee Ok
¢ a
§ ‘
€ &
OE
EE
CCE
&)
CREEK KEK
EEK EHLBEEE
ERE
5, e %
\
6.F ———
} SW"
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS
(RAILWAY BOARD) ,
No.2008/Chg-1I/30/1/Pt.(CRS) New Delhi, dated 11.11.2008
The Principal Chief Engineer, East Central Railway, Hajipur.
The Principal Chief Engineer, Southern Railway,
Chennai.
Subject:- CRS Sanction for Garibrath Trains.
Coaching Directorate of Railway Board has informed that the Rolling Stock of following Garibrath Trains as announced by Hon’ ble MR in Rail Budget have been received by the Zonal Railways but the services cannot be utilized as CRS (sanction is yet to be obtained for these higher speed and higher capacity coaches.
The trains are:-
Introduction
(i) 2877/2878 Ranchi-New Delhi Garib Rath (ii) 2211/2212 Bapudham Motihari-Porbander Garib Rath (iii) 2255/2256 Yeshvantpur-Puducherry Garib Rath
Increase in Frequency () 2203/2204 Saharsa-Amritsar Garib Rath Express
CTPMs of the Zonal Railways are already chasing the matter with the concerned CBEs of the Zonal Railways.
You are requested to kindly look into the matter and arrange for an early CRS sanction so that these trains can be introduced at the earliest.
CT. PTA) he Executive Director Civil Engg(G)
Railway Board
230 C\Users\dell\Desktop\GENERAL DOCUMENTS OF CEDO 2RANCH-|.doc
, ei yor $ meen
+
J IWIWIIIODO
DID 3999990)
2D AFD
DVD
DDDIDYD
| we
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS
(RAILWAY BOARD)
No. 2006/CEDO/ORI/41. New Delhi, dated 21.11.2008
The Chief Commissioner of Railway Safety, DRM NER Compound, Ashok Marg, Lucknow-226001.
Sub: Opening of newly converted BG line after conversion from MG to BG between Kanpur Anwarganj and Farrukhabad stations of Lucknow and Izzatnagar divisions of NE Railway for public carriage of passengers.
Ref: (i) CCRS’s Letter No. R. 12035/02/2006-CCRS dated 14.09.06 ; {ii)CRS’s (North Eastern Circle) letter No. 447/1/A/OPG/P.T./920 dated 29.08.06
With reference to your endorsement No. R. 12035/02/2006-CCRS dated 14.09.06, the approval of Ministry of Railways is hereby communicated to the recommendation of Commissioner of Railway Safety, North Eastern Circle,
Lucknow for opening of the above section for public carriage of passengers as
per his letter No. t 7/1/A/OF G/P. T./920 dated 29. O08. O06.
ote) P ) (T
“ ecutive Director Civil Engg.(G) Railway Board.
No. 2006/CEDO/ORI/41. New Delhi, dated 2[.11.2008
Copy forwarded for information to: (i) The Commissioner of Railway Safety,, North Eastern Circle, Hazratganj,
Lucknow-226001, w.r.t. his letter No. 447/1/A/OPG/P.T./920 dated 29.08.06. ,
(ii) The Chief Administrative Officer (Const.), North Eastern Railway, - Gorakhpur.
(iii)/The General Manager (Engg), North Eastern Railway, Gorakhpur.
i Chota) ( T.Gupta ) for Secretary, Railway Board.
TH AeaaT Ministry Of Railways
me ae
Date of lnaue ..
—-
7” az
YY OH.IIOIA
YIOOOIVIVIOODOIVIONOIDIDIOIODID OOOO
OD
we
~ ” “ ~
% oc
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
(RAILWAY BOARD)
No, 2000/CEDO/ORI/37. New Delhi, dated 7 {.11.2008
The Chief Commissioner of Railway Safety, DRM NER Compound, Ashok Marg,
Lucknow-226001.
Sub: Opening of BG double line (Dn line) Gonda Jn.- Maijapur. section (17.77 Kms) of Lucknow division of NE Railway for goods and passenger traffic.
Ref: (i) CCRS’s Letter No. R. 12025/02/2000-RS dated
25.08.2000.
(iij)CRS’s (North Eastern Circle) letter No. 427 {403 /1/D/OPG/P.T. dated 02.08.2000.
With reference to your endorsement No. R. 12025/02/2000-RS dated
25.08.2000, the approval of Ministry of Railways is hereby communicated to
the recommendation of Commissioner of Railway Safety, North Eastern Circle,
Lucknow for opening of the above section for public carriage of passengers as
per his letter No. 427 /403/1/D/OPG/P.T. dated 02.08.2000.
(Teta) Executive Director Civil Engg.({G)
c Railway Board. "
No. 2000/CEDO/ORI/37. New Delhi, dated 2{.11.2008
Copy forwarded for information to: (i) The Commissioner of Railway Safety, North Eastern Circle, Hazratganj,
Lucknow-226001, w.r.t. his letter No. 427/403/1/D/OPG/P.T. dated
02.08.2000. (ii) The Chief Administrative Officer (Const), North Eastern Railway,
Gorakhpur. (iii) The General Manager (Engg), North Eastern Railway, Gorakhpur.
uv ue——
( T.Gupta )
for Secretary, Railway Board.
TH Ae iay Ministryof Railways
aya wes Railfpay- board
a At Bree are wie with E Ssure
RTs Signature .... 4 ak ane see wav nteoctane
arty at fare } Date of Issue ..
3. 909090900903999979999999999999997939733
499
es
a ie
*
\-
No, 2004/CEDO/ORI/45/NR
“
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS
(RAILWAY BOARD}
The Chief Commissioner of Railway Safety, DRM NER Compound, Ashok Marg,
Lucknow-226001.
Sub:
Ref:
Opening of non-electrified Jammu Tawi-Bajalta BG single line (opened in the past but not in use) and Bajalta-
Udhampur newly constructed BG single line section on
Firozpur division of Northern Railway for public carriage
of passengers.
(i) CCRS’s Letter No. R. 12014/02/2004/RS dated
23.09.04. (ii)CRS’s (Northern Circle) letter No.
R/12014/37/2004/NC/717-729 dated 23.08.04.
With reference to your endorsement No. R. 12014/02/2004/RS dated
23.09.04, the approval of Ministry of Railways is hereby communicated to the
recommendation of Commissioner of Railway Safety, Northern Circle, New
Delhi for opening of the above section for public carriage of passengers as ‘per
his letter No. R/12014/37/2004/NC/717-729 dated 23.08.04.
No. 2004/CEDO/ORI/45/NR
ae
J
« ( T.Gupta ) i Executive Director Civil Engg.(G)
; Railway Board.
New Delhi, dated 2\.11.2008
Copy forwarded for information to: (i) The Commissioner of Railway Safety, Northern Circle, CRIS Complex,
Chanakyapuri, New = Delhi-110021, w.r.t. his letter No.
R/12014/37/2004/NC/717-729 dated 23.08.04.
(ii) The Chief Administrative Officer (Const.), Northern Railway, New Delhi.
(iii)The General Manager (Engg), Northern Railway, New Delhi.
nmggnentnaedemenneneeseeiea —~
| ret wrt reray x ye
for S (T.G pra) Board a or Secretary, Railway Board. 2 ae arty . Rea 2 a with Bhcosure
Signature . ., Fees ee ee oe . arey at tafe — SL 1 Date of Issue oa
New Delhi, dated x .11.2008 |
@& ~~)
5 )
9
3 BE.
& , >
{
QOIOIVOV,IDOIIIIMAOD VIO
IY
YQNOOONODODNDIND
ro
}
ro
Head wana GOVERNMENT OF INDIA }21
Qa digietal MINISTRY OF RAILWAYS
(Aad BS RAILWAY BOARD )
No. 2008/CEDO/SD/ 12. - New Delhi, dated 12.12.2008
The General Manager(Engg),
Eastern Railway,
Kolkata.
Sub: Condonation of infringing gradient in the yard in
connection with conversion of up loop line into a common
loop at Jasdih station of Sitarampur- Jhajha section in
Asansol Division of Eastern Railway.
Ref: Your office letter No. W(3)591/ 4/Vol-II dt.24.06.2008
With reference to your !etter referred above, sent through the Chief
Commissioner of Railway Safety, Lucknow, the sanction of Ministry of
Railways, Railway Board is here by communicated’ for Condonation for
adopting existing steep gradient in the yard in connection with
conversion of up toop line into a common loop at Jasdih station of
Sitarampur- Jhajha section in Asansol Division of Eastern Railway as
shown in Form-XVII and Plan enclosed with above referred application
J! 2
( T.Gupta )
Executive Director Civil Engg.{G)
' ; Railway Board.
No. 2008/CEDO/SD/ 12. New Delhi, dated 12.12.2008
copy forwarded for information to :
1. The CCRS, Ashok Marg, Lucknow w.rt. his endorsement no. wa11019/03/2008-
aottro dated 25.11.2008
2 The CRS/Eastem Circle, 14, Strand Road, 12" floor, Kolkatta-01 w.r.t. his letter No.
2/5/ VEIT /infringement/08/601/H dated 05/11/08.
ao
(T.Gupta)
for Secretary, Railway Board
Te.
T)
a
et
¥
; re . — Ce
i grad -arranrt GOVERNMENT OF INDIA oF
Yn Mo Ke? Yet Barta MINISTRY OF RAILWAYS Te
“Se (ae BS RAILWAY BOARD ) |
No. 2008/CEDO/ SD/13 . New Delhi, dt 18.12.2008
The General Manager/Engg.., South Central Railway,
Secunderabad.
Sub: Condonation of infringing gradient in the yard in
connection with doubling of track between Pullampet and
Bhakrapet stations at _Mantapampalli station of Gooty-
Renigunta section in Guntakal Division of South Central
Railway.
Ref: Your office Letter No W.573/Y/infringeing Gradients/ MMPL
Dated 14.10.2008.
Vide your letter referred above, Board’s Condonation has been
sought for infringing gradient in the yard in connection with doubling of
track between Pullampet and Bhakrapet stations at Mantapampali station
of Gooty- Renigunta section in Guntakal Division to SOD, Revised 2004 .
However, while processing the proposal for Board’s approval,
AM/CE has passed the following remarks:
“ The justification does not appears to be correct”
In view of above SC.Rly is requested to send the revised
justification so that same can be processed further.
UP 2a (T. Gupta)
Executive Director, Civil Engg. (G)
g Railway Board.
\ .
ee HATA
finiatry Of Railways
Mi pe TH
Pate Para Board 7
gaa afed aM
tape with Enclosure
ea
a ae nae ene ese ee
Signature cen aneeeneqeaeeae
ar a fafa nce
| pate af lesue@ re et vem
& OX
on
ow ee
-
5 5 N09 HAD 96
9
5 &
59
4 fy
cae
V9ODO999D97 ODO
S O
Ne A
- e
Yer gialeta MINISTRY OF RAILWAYS (aa Bs RAILWAY BOARD )
No. 2008/CEDO/SD/14 a New Delhi, dated 19.12.2008
The General Manager(Engg), South Western Railway,
Hubhi.
Sub: Condonation of infringing gradients in the yard in connection with Gauge conversion of track for proposed bye pass line —
between Yelahanka/Salem-Yeshwantpur line and Yeshwantpur -
Tumkur of Salem-Yeshwantpur section in Bangolore Division of -
South Western Railway.
Ref: CAO(C)/SWR letter No. W.GC.347/BNC/YPR-SA dt.16.10.2008
With reference to CAO(C)/SWR letter referred above, sent through the
Chief Commissioner of Railway Safety, Lucknow, the sanction of Ministry of
Railways, Railway Board is here by communicated for Condonation of
infringing gradients in the yard in connection with Gauge conversion of
track for proposed bye pass line between Yelahanka/Salem-Yeshwantpur
line and Yeshwantpur -Tumkur of Salem-Yeshwantpur section in
‘ Bangolore Division of South Western Railway as shown in. Form- XVII and
Drawings enclosed with above referred application |
J aa :
' , { T.Gupta ) Executive Director Civil Engg.(G)
Railway Board. |
No. 2008/CEDO/SD/14 New Delhi, dated 19.12.2008
Copy forwarded for information to ;: :
1. The CCRS, Compound of DRM/NER, Ashok Marg, Lucknow -226001 w.xr.t. his endorsement No.@g,11017/06/2008- aoftro dated 27.11.08
2. The C CLD i bebe, yf, Seshadri Road, Gandhinagar , Bangalore- 09
w.r.t his jghter "eg 1017/2008 09/uat Ssuaeq, gre 11208 dt .28.10. 2008.
bor A oa aye “ate (T. Gupta) .
Jadud Merv di.)
eUere Ni 7 for Secretary, Railway Board - enone ene
Signatur fp teense