Post on 22-Feb-2023
Environmental and Social Due Diligence Report
Project Number: 47083-004 October 2019
INDIA: Accelerating Infrastructure Investment
Facility in India – Tranche 3 Jindal Urban Waste Management (Guntur) Ltd
Prepared by India Infrastructure Finance Company Limited for the India Infrastructure Finance
Company Limited and the Asian Development Bank.
This environmental and social due diligence report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
Environment and Social Safeguards Due Diligence Report India Infrastructure Finance Company Ltd.
IIFCL/ESDDR/ADB/2019/110/V2 1 JUWMGL
Environment and Social Safeguards Due-Diligence Report
Construction of 15 MW Municipal Solid Waste to Energy Processing Facility at Guntur in
the State of Andhra Pradesh, India
Sub Project Developer – Jindal Urban Waste Management (Guntur) Ltd
April 2019
Environment and Social Safeguards Due Diligence Report India Infrastructure Finance Company Ltd.
IIFCL/ESDDR/ADB/2019/110/V2 2 JUWMGL
SUB PROJECT: 15 MW Waste-to-Energy (WtE) Project with construction and operation
of MSW processing facility for the obligated quantity of MSW during the concession
period on design, build, finance, operate and transfer (DBFOT) basis and setup of landfill
and disposal of the process remnants and residual inert matters at Guntur in the State of
Andhra Pradesh, India.
Jindal Urban Waste Management (Guntur) Limited
Environmental and Social Safeguards Due Diligence Report
(ESDDR)
Prepared by Dr. Rashmi Kadian
Assistant General Manager
(Environmental Specialist)
ESMU, IIFCL
Mr. Krupasindhu Guru
Assistant General Manager
(Social Specialist)
ESMU, IIFCL
Reviewed and Approved by Dr. S. S. Garg
Head, ESMU
IIFCL
Environment and Social Safeguards Due Diligence Report India Infrastructure Finance Company Ltd.
IIFCL/ESDDR/ADB/2019/110/V2 3 JUWMGL
CONTENTS
PROJECT BACKGROUND ...................................................................................................................................... 6
1. PURPOSE OF THE REPORT ........................................................................................................................ 7
2. SUBPROJECT TITLE .................................................................................................................................... 7
3. SUBPROJECT SCOPE ................................................................................................................................... 7
4. PROJECT BACKGROUND ........................................................................................................................... 7
5. PROJECT DETAILS ....................................................................................................................................... 8
6. SUB-PROJECT LOCATION ........................................................................................................................ 10
7. DEBT COMPONENT OF THE PROJECT ................................................................................................ 11
8. STATUS OF REGULATORY PERMISSIONS AND APPROVALS FOR SETTING UP JUWMGL .. 11
9. ABOUT THE PROJECT ............................................................................................................................... 14
10. PROJECT LOCATION AND SCALE ......................................................................................................... 14
12. POLICY, LEGAL AND REGULATORY REQUIREMENT .................................................................... 17
13. COMPLIANCE OF JUWMGL WITH ESSF OF IIFCL ........................................................................... 17
16. DESCRIPTION OF THE ENVIRONMENT ............................................................................................... 20
17. VISIT TO SUB-PROJECT LOCATION ..................................................................................................... 21
18. ANTICIPATED ENVIRONMENTAL IMPACTS DURING CONSTRUCTION PHASE AND
MITIGATION MEASURES ......................................................................................................................... 21
21. ENVIRONMENT MANAGEMENT PLAN ................................................................................................ 27
22. INSTITUTIONAL FRAMEWORK FOR EMP IMPLEMENTATION ................................................... 31
23. CATEGORIZATION OF SUB-PROJECT ................................................................................................. 31
24. PROJECT AGAINST THE PROHIBITED INVESTMENT ACTIVITIES LIST .................................. 31
25. PUBLIC CONSULTATION AND INFORMATION DISCLOSURE ....................................................... 31
26. GRIEVANCE REDRESSAL MECHANISM .............................................................................................. 32
28. CONCLUSIONS AND RECOMMENDATIONS ....................................................................................... 34
29. PURPOSE OF THE SOCIAL SAFEGUARDS DUE DILIGENCE: ......................................................... 37
30. PROJECT AGAINST THE PROHIBITED INVESTMENT ACTIVITIES LIST: ................................. 37
31. OBJECTIVE OF SOCIAL SAFEGUARDS DUE DILIGENCE: .............................................................. 37
32. APPROACH AND METHODOLOGY: ...................................................................................................... 37
33. STAKE HOLDERS CONSULTATION: ..................................................................................................... 38
34. SOCIAL IMPACT OF THE PROJECT: ..................................................................................................... 38
34.1 IMPACT ON STRUCTURE: ........................................................................................................................ 38
34.2 LAND ACQUISITION IN THE PROJECT: ............................................................................................... 39
34.3 RESETTLEMENT IMPACT IN THE SUB-PROJECT ............................................................................. 39
34.4 IMPACT ON SCHEDULE TRIBE PEOPLE: ............................................................................................. 39
34.5 IMPACT ON COMMON PROPERTIES RESOURCES (CPR): .............................................................. 40
35. GRIEVANCE REDRESSAL MECHANISM: ............................................................................................. 40
36. LOCAL EMPLOYMENT: ............................................................................................................................ 40
37. LABOUR LICENSE OBTAINED BY THE SUBPROJECT DEVELOPER: .......................................... 40
38. DISCLOSURE: ............................................................................................................................................... 41
39. SITE VISIT OBSERVATION: ..................................................................................................................... 41
40. CONCLUSIONS AND RECOMMENDATIONS: ...................................................................................... 41
LIST OF TABLES
TABLE 1: SALIENT FEATURES OF JUWMGL………………………………………………………………..8
TABLE 2: MAIN UNITS OF JUWMGL…………………………………………………………………………..9
TABLE 3: AVAILABILITY OF PERMITS/APPROVALS FOR SETTING UP JUWMGL …………………11
TABLE 4: STATUS OF JUWMGL CONSTRUCTION …………………………………………………………14
TABLE 5: STATUTORY CLEARANCES/APPROVALS/PERMITS REQUIRED & PRESENT STATUS..18
TABLE 6: ASSESSMENT BASED ON LOCATION CRITERIA AS PER CPHEEO, GOVERNMENT OF
INDIA..……………………………………………………………………………………………………….21
TABLE 7: ENVIRONMENT MANAGEMENT PLAN IMPLEMENTATION MATRIX FOR
CONSTRUCTION STAGE………………………………………………………………………………...27
Environment and Social Safeguards Due Diligence Report India Infrastructure Finance Company Ltd.
IIFCL/ESDDR/ADB/2019/110/V2 4 JUWMGL
TABLE 8: ENVIRONMENT MANAGEMENT PLAN IMPLEMENTATION MATRIX FOR OPERATION
STAGE……………………………………………………………………………………………………….29
LIST OF FIGURES
Figure 1: JUWMGL Plant location – MSW Processing facility (A) and landfill site (B) …………….16
ANNEXURES
Annexure I Government Order for Land Allocation to JUWMGL
Annexure II Labour License
Annexure III Group Personal Accident Insurance
Annexure IV Airports Authority of India No Objection Certificate
Annexure V Evacuation arrangement letter
Annexure VI Concession Agreement of JUWMGL (relevant clauses to Environmental
Management)
Annexure VII No Objection Certificate from Forest Department
Annexure VIII Consent for Establishment from State Pollution Control Board
Annexure IX Authorisation from State Pollution Control Board
Annexure X Letter regarding treated sewage water supply
Annexure XI Permission for ground water use
Annexure XII Provisional Fire No Objection Certificate
Annexure XIII Village Resolution for setting up of JUWMGL
Annexure XIV Director of Factories Approval
Annexure XV Fuel Storage Permission
Annexure XVI Buffer zone amendment letter
Annexure XVII Lease Agreement
Annexure XVIII ESIC Certificate
PHOTOPLATES
PHOTOPLATE I - SITE VISIT PHOTOGRAPHS
PHOTOPLATE II – STAKE HOLDERS CONSULTATION
Environment and Social Safeguards Due Diligence Report India Infrastructure Finance Company Ltd.
IIFCL/ESDDR/ADB/2019/110/V2 5 JUWMGL
ABBREVIATIONS
AAI Airports Authority of India
APSPDCL Andhra Pradesh Southern Power Distribution Company Limited
CEMS Continuous Emission Monitoring System
CPHEEO Central Public Health and Environmental Engineering Organization
dB Decibel
DBFOT Design, Built, Finance Operate and Transfer
DPR Detailed Project Report
EIA Environmental Impact Assessment
EMP Environment Management Plan
EPC Engineering Procurement & Construction
ESDD Environmental and Social Due Diligence
ESDDR Environmental and Social Due Diligence Report
ESMU Environment and Social Management Unit
GMC Guntur Municipal Corporation
GoAP Government of Andhra Pradesh
GoI Government of India
GRM Grievance Redressal Mechanism
HSE Health Safety Environment
HVAC Heat Ventilation & Air Conditioning
IIFCL India Infrastructure Finance Company Limited
JUIL JITF Urban Infrastructure Limited
JUWMGL Jindal Urban Waste Management (Guntur) Limited
KLD Kilo Liters Per Day
LIE Lenders Independent Engineer
LoA Letter of Award
MDB Multilateral Development Bank
MoEFCC Ministry of Environment, Forests and Climate Change
MPR Monthly Progress Report
MSW Municipal Solid Waste
MRF Material Recovery Facility
NOC No Objection Certificate
NREDCAP New and Renewable Energy Development Corporation of Andhra Pradesh
Limited
PIAL Prohibited Investment Activities List
PIM Project Information Memorandum
PPE Personal Protective Equipment
RDF Refuse Derived Fuel
SEIAA State Level Environment Impact Assessment Authority
STP Sewage Treatment Plant
TOR Terms of Reference
TPD Ton per Day
ULB Urban Local Body
WtE Waste to Energy
Environment and Social Safeguards Due Diligence Report India Infrastructure Finance Company Ltd.
IIFCL/ESDDR/ADB/2019/110/V2 6 JUWMGL
PROJECT BACKGROUND
Environment and Social Safeguards Due Diligence Report India Infrastructure Finance Company Ltd.
IIFCL/ESDDR/ADB/2019/110/V2 7 JUWMGL
1. PURPOSE OF THE REPORT
1. This Environmental and Social Due Diligence Report (ESDDR) has been prepared by India
Infrastructure Finance Company Limited (IIFCL) in consultation with the Concessionaire, Jindal
Urban Waste Management (Guntur) Limited (JUWMGL) to assess the adequacy of the project with
the applicable safeguard compliance. The report has been prepared as per the
documents/information received from the concessionaire and on the basis of site visit observations.
The information given in the ESDDR is agreed and confirmed by the Concessionaire.
2. SUBPROJECT TITLE
2. 15 MW Waste-to-Energy (WtE) Project with construction and operation of Municipal Solid Waste
(MSW) processing facility for the obligated quantity of MSW during the concession period on
design, build, finance, operate and transfer (DBFOT) basis and setup of landfill and disposal of the
process remnants and residual inert matters.
3. SUBPROJECT SCOPE
3. The scope of the sub-project includes design, build, finance, operate and transfer (DBFOT) of
facilities and infrastructure for construction and operation of municipal waste processing facilities
and waste to energy processing facility for the obligated quantity of MSW during the concession
period. The scope of the project also includes setting up of landfill and disposal of process
remnants and residual inert matters.
4. PROJECT BACKGROUND
4. Government of Andhra Pradesh (GoAP), as part of Swachha Andhra Mission, proposes to set up
Waste to Energy (WtE) Plants at various locations in Andhra Pradesh and has identified beneficiary
Urban Local Bodies (participating ULBs) at each of these locations in Andhra Pradesh which are
expected to deliver MSW to the WtE processing facilities.
5. New and Renewable Energy Development Corporation of Andhra Pradesh Limited (NREDCAP)
was authorized by the participating Urban Local Bodies (ULBs) to run the bidding process for
selection of an entity to which the projects in each of the clusters may be awarded. Through a
competitive bidding process conducted by NREDCAP, M/s JITF Urban Infrastructure Limited
(JUIL) has been awarded the contract for implementation of the project in the cluster Guntur vide
Letter of Award (LoA) issued on 3rd
December, 2015. The project was awarded for capacity of 15
MW for Guntur at a power sale tariff of ₹ 6.165/unit. JUIL formed project special purpose vehicle
Environment and Social Safeguards Due Diligence Report India Infrastructure Finance Company Ltd.
IIFCL/ESDDR/ADB/2019/110/V2 8 JUWMGL
(SPV) - Jindal Urban Waste Management (Guntur) Limited for undertaking the proposed project
development, operation and maintenance.
5. PROJECT DETAILS
6. The location of the proposed WtE facility is at Naidupeta, on Guntur – Chilakaluripeta Road in
Guntur District, 17 Kms from Guntur. The geographical location is approximately at 80° 18’ 0.08” E Latitude and 16° 14’ 9.07” N Longitude. The site elevation is 59 m from Mean Sea Level. Soil at the location is rocky and gravel. There is no habitation within the proposed project site.
7. The Concession Agreement for the sub-project was signed on 6th February, 2016 on design, build,
finance, operate and transfer (DBFOT) basis between JUWMGL and Guntur Municipal
Corporation as Lead ULB and eight other participating ULBs i.e. Vijayawada, Tenali,
Chilakaluripeta, Sattenapalli, Mangalagiri, Narasaraopeta, Ponnur and Tadepalle ULB. Thus, the
WtE project will process MSW received from nine ULBs in Guntur cluster.
8. As per concession agreement, Concessionaire shall develop the project facilities using technologies
adhering to Solid Waste Management Rules, 2016 which ensures:
Biodegradable and recyclable content of MSW are separated through suitable material
recovery facility;
A suitable technology is used for processing the bio-degradable and combustible
content of MSW;
A suitable technology is used for recovering and processing recyclable content of MSW;
Disposal of not more than 25% of received MSW in the landfill;
Disposal of not less than 2% of waste measured at landfill site.
9. MSW supply to the sub-project will be the responsibility of the participating ULBs. The evacuation
arrangement for power generated at WtE plant is the responsibility of Andhra Pradesh Southern
Power Distribution Company Limited (APSPDCL). APSPDCL has committed that the evacuation
arrangement will be completed before the plant is ready for synchronization.
10. The salient features of sub-project are given in the Table 1 below :
Table 1: Salient Features of JUWMGL
Village Kondaveedu
Mandal Edlapadu
District & State Guntur, Andhra Pradesh
Latitude 160 – 17’ N
Longitude 800 - 20’ E
Nearest Access Road NH-16 (2 km)
Environment and Social Safeguards Due Diligence Report India Infrastructure Finance Company Ltd.
IIFCL/ESDDR/ADB/2019/110/V2 9 JUWMGL
11. The sub-project consists of the following main units:
Table 2: Main Units of JUWMGL
Nearest Railway Station Guntur -14.4 km
Nearest Airport Vijaywada – 67 km
Participation ULBs ULB Distance from
project site in km
MSW generation in Tonnes
per Day (TPD)
Guntur 15 320
Vijaywada 49.6 525.54
Tenali 37 68
Chilakaluripeta 31 62
Sattenapalli 37.4 45
Mangalagiri 37.4 52
Narasaraopeta 51 65
Ponnur 40 35
Tadepalli 44.7 30
Concessioning
Authority Municipal Corporation of Guntur
Concession period 25 Years
Tonnage per day Guntur Municipal Corporation and other 8 ULBs: 1200 MT
Source of Water Treated STP Water
Total Land Area of
Existing Plot
15.5 Acres for MSW processing facility & 35.74 acres for landfill site
Power Connectivity Grid Sub-station of APSPDCL at Vengalayapalem, 3 km
MSW Handling
Capacity
1650 TPD
Power Generation 15 MW
Technology used Refuse Derived Fuel (RDF) based power plant
Unit Details
MSW Receipt Weigh bridge - Two weigh bridges (1-input & 1-output) of minimum
40 tons weighing capacity will be installed on approach road from main
vehicle entry gate to the material recovery facility
Tipping Floor – After weighing, the trucks will proceed to the tipping
floor, where the driver unloads the waste in the designated dumping pit.
Material Recovery
Facility Bio Drying Section - There will be two dumping pits and 12 pits for
bio-drying arranged in two bays in a closed shed.
Material Segregation – after a stipulated period, semi decomposed
material will be fed to hopper for manual segregation to remove bigger
materials like boulders, stones, synthetic fabrics, mats, tyres, hard
boards, woods etc., to facilitate for the pre-processing unit to segregate
the waste effectively. Manual segregation will be followed by
Environment and Social Safeguards Due Diligence Report India Infrastructure Finance Company Ltd.
IIFCL/ESDDR/ADB/2019/110/V2 10 JUWMGL
6. SUB-PROJECT LOCATION
12. The proposed project site is currently being utilised as dumping yard/landfill site by Guntur
Municipal Corporation. The site has proper road access and is near to existing highways for easy
movement of MSW trucks.
13. The entire facility is being developed on Government land. Guntur Municipal Corporation signed a
lease agreement with JUWMGL on 19.07.2018 for an area of 15.5 Acres for setting up a MSW
processing facility. Existing dump yard site having an area of 35.74 acres has been allotted to
JUWMGL by Municipal Corporation, Guntur vide letter dated 12.04.2017, for development and
operation for storage of residue as per Concession Agreement.
mechanical segregation.
Production of RDF - Drag conveyor will receive material from rake
carrier and distribute the same in the designated storage area for further
curing. Prepared RDF will be stored in the RDF storage area.
Main equipment of MRF are belt conveyor, rotary screen trommel,
ballistic separator, magnetic separator, shredder, rake carrier, drag
conveyor, hopper, de-stoner & cyclone separator, bagging machine,
crane, grab bucket etc.
Power Plant Boiler including auxiliaries-Two number of boilers.
Air pollution control system-Semi wet type of system is being
installed at JUWMGL for air pollution control
Ash handling and Disposal- for disposal of fly ash and bottom ash
Turbo generator – 1X15 MW
Condensing plant- Air cooled condenser
Balance of Plant
Water system - Treated water from STP will be used at JUWMGL.
Total requirement of water for the project is estimated as 324 m3/day as
per water balance.
Compressed air system - for ash handling system and for
instrumentation
Electrical system – including control & instrumentation system
Heat Ventilation and Air Conditioning (HVAC) - At various plant
facilities
Fire fighting – Including hydrant system, spray water system, high
velocity water spray system, medium velocity water spray system, hand
appliances system, sprinkler system
Effluent treatment – system for treating discharge from drain from
cooling tower, reject & back wash from water treatment section and
leachate treatment
Environment monitoring system - Continuous Emission Monitoring
System (CEMS) at stack
Sanitary Landfill - For disposal of waste from the MSW processing
facility.
Environment and Social Safeguards Due Diligence Report India Infrastructure Finance Company Ltd.
IIFCL/ESDDR/ADB/2019/110/V2 11 JUWMGL
7. DEBT COMPONENT OF THE PROJECT
14. The total cost of the project is estimated at ₹ 218.84 crore and is proposed to be financed with a
debt to equity ratio of 70:30. The total debt requirement for the project is ₹ 153.19 crore and the Equity is ₹ 65.65 crore. The Consortium led by Lead Lender IREDA is providing a loan of ₹ 109.42 crore and IIFCL has sanctioned a term loan of ₹ 43.77 crore (including Debt Service Reserve loan of Rs.1.92 Cr) under Direct Lending Scheme.
8. STATUS OF REGULATORY PERMISSIONS AND APPROVALS FOR SETTING UP
JUWMGL
Table 3: Availability of Permits/Approvals for setting up JUWMGL
S. No.
Key requirements Availability
Status
Remark
1. Concession Agreement Obtained Concession Agreement for setting up Waste to
Energy processing facility at Guntur, Andhra
Pradesh was signed on 6.2.2016 between Guntur
Municipal Corporation, Vijayvada Municipal
Corporation, Tenali Urban Local Body,
Chilakaluripeta Urban Local Body, Sattenapalli
Urban Local Body, Mangalagiri Urban Local Body,
Narsaraopeta Urban Local Body, Ponnur Urban
Local Body, Tadepalle Urban Local Body and
JUWMGL.
2. Power Purchase Agreement Obtained PPA between Andhra Pradesh Southern Power
Distribution Company Limited, Guntur of Andhra
Pradesh and JUWMGL has been signed on
6.02.2016.
3. Construction Power Agreement Obtained Construction Power Agreement under the Electricity
(Supply) Act 2003 has been signed between Andhra
Pradesh Southern Power Distribution Company
Limited and JUWMGL on 12.03.2018. Power
supply agreement is for supply during the
construction period.
4. Land Allotment / Lease Obtained Guntur Municipal Corporation signed a lease
agreement with JUWMGL on 19.07.2018 for an
area of 15.5 Acres for setting up a MSW
processing facility. Existing dump yard site
having an area of 35.74 acres has been allotted to
JUWMGL by Municipal Corporation, Guntur vide
letter dated 12.04.2017. Government order dated
14.11.2017 in this regard is enclosed as Annexure
I.
5. Labour License & Insurance Obtained Labour License has been granted to the subproject
under Sub Section 2 (d) and 4(2) of the Andhra
Pradesh (Issuance of Integrated Registration and
Furnishing of Combined Returns under various
Labour Laws by certain Establishments) Act, 2015
Environment and Social Safeguards Due Diligence Report India Infrastructure Finance Company Ltd.
IIFCL/ESDDR/ADB/2019/110/V2 12 JUWMGL
The copies of the Certificate of Registration are
attached as Annexure II. Sample copy of insurance
taken by the main contractor is attached as
Annexure III.
6. Permission from Airport
Authority of India
Obtained NOC from Airport Authority of India has been
obtained JUWMGL vide letter dated 17.5.2016
(Annexure IV).
7. Evacuation Arrangement Obtained Southern Power Distribution Company of Andhra
Pradesh vide letter dated 11.10.2018 has informed
that the evacuation arrangement will be completed
before the plant is ready for synchronization
(Annexure V).
8. Boiler Drawing Approval Obtained Boilers Department, Government of Andhra Pradesh
approved the boiler drawings as per compliance of
Indian Boiler Regulations, 1950 vide letters dated
25.5.2018 and 29.5.2018.
Environment and Social Safeguards Due Diligence Report India Infrastructure Finance Company Ltd.
IIFCL/ESDDR/ADB/2019/110/V2 13 JUWMGL
DUE DILIGENCE ON ENVIRONMENTAL SAFEGUARDS
Environment and Social Safeguards Due Diligence Report India Infrastructure Finance Company Ltd.
IIFCL/ESDDR/ADB/2019/110/V2 14 JUWMGL
9. ABOUT THE PROJECT
15. Government of Andhra Pradesh (GoAP), as part of Swachha Andhra Mission, proposes to set up Waste
to Energy (WtE) Plants at various locations in Andhra Pradesh and has identified beneficiary Urban
Local Bodies (participating ULBs) at each of these locations in Andhra Pradesh which are expected to
deliver MSW to the WtE processing facilities. The Participating ULBs would undertake development
and operation/maintenance of the proposed WtE processing facilities (projects) through Public-Private
Partnership (PPP) on Design, Build, Finance, Operate and Transfer (DBFOT) basis.
16. M/s JITF Urban Infrastructure Limited (JUIL) has been awarded the contract for implementation of the
WtE project in Guntur cluster for capacity of 15 MW, at a power sale tariff of Rs.6.165/unit.
17. JUIL has formed project SPV viz. Jindal Urban Waste Management (Guntur) Limited for undertaking
the proposed project development, operation and maintenance for Guntur MSW management facility.
18. The scope of the sub-project includes construction and operation of MSW processing facility and waste
to energy processing facility and setting up of landfill for disposal of process remnants and residual inert
matters.
19. As per the Concessions Agreement, the processing technologies proposed at the sub-project should
ensure that the technologies used are appropriate as per SWM Rules, 2016.
20. The sub-project is expected to achieve commercial operation by September 2019. As per Lenders
Independent Engineer (LIE) report for quarter ending December 2018, the progress of the sub-project is
given in the table below:
Table 4: Status of JUWMGL Construction
Construction Activity Status
Boiler Structure Completed; Installation of boiler pressure parts to be completed by mid-Mar 2019
Air cooled condenser Civil works completed
Turbine generator building 90% completed
MSW receiving area 50% of civil works completed
Flue gas cleaning system 80% of RCC works completed mechanical work in progress
Water treatment plant Civil works commenced and foundation completed
Weigh bridge 60% works completed
Switch Yard 70% civil works completed
Leachate Treatment Plant Yet to commence and to be completed within three months
Switch Yard 70% civil works completed
Source: LIE Report, December 2018
10. PROJECT LOCATION AND SCALE
21. Guntur Waste to Energy Plant is proposed to be located in Kondaveedu Village, Edlapadu Mandal in
Guntur District. Land is allocated by Guntur Municipal Corporation (GMC) near Naidupeta dump yard
as per the terms of Concession Agreement. Site is connected to NH-16 by approach road.
Environment and Social Safeguards Due Diligence Report India Infrastructure Finance Company Ltd.
IIFCL/ESDDR/ADB/2019/110/V2 15 JUWMGL
22. The land allocated for the MSW processing facilities at the sub-project is about 15.5 acres. The lease
agreement for the land was signed on 19.07.2018 for a period of 25 years. Guntur Municipal
Corporation has handed over the land to JUWMGL for developing the sub-project. The area is being
used for construction and development of integrated MSW processing facility comprising material
recovery facility and power plant with auxiliaries, water treatment plant, administrative and amenities
blocks and common facilities etc. in addition this land, an area of 35.74 acres has been allotted to
JUWMGL by Guntur Municipal Corporation vide letter dated 12.4.2017 for landfill site. The land
area has been leased and allotted as per terms of Concession Agreement signed between GMC and
JUWMGL on 6.02.2016. The land allocated for the sub-project is an existing dump yard of GMC.
Location of sub-project along with location in Google maps is given in Figure 1.
11. APPROACH TO THE ENVIRONMENT SAFEGUARDS DUE-DILIGENCE REPORT
(EDDR)
23. As part of environmental due diligence (EDD), the review of available documents/information has
been done to assess compliance of the sub-project with respect to statutory regulations related to
environmental safeguards. Projects financed by IIFCL which are posed for MDB’s line of credit,
are required to undergo to an environmental and social due diligence process utilizing the
procedures described in the ESSF to ensure sustainable project investment. Categorization of the
sub-project with respect to ADB and IIFCL ESSF forms part of the ESDD. EDD also covers and
assesses the process of identifying environmental impacts and implementation of environmental
management measures; contractual obligations for Health Safety Environment (HSE) measures;
public consultations and information disclosure; implementation of HSE measures; institutional
arrangement for implementing environmental measures; site visit observations & photographs. The
EDDR concludes the outcome along with recommendations for the sub-project.
24. The following documents were referred in order to prepare Environmental Safeguards Due-
Diligence Report:
Project Information Memorandum (PIM)
Detailed Project Report
Lender’s Independent Engineer’s Report for quarter ending December 2018 Project Statutory Approvals
Project HSE Documents
Concession Agreement
Power Purchase Agreement
Land allotment/lease agreement
Labour License
EPC Work Orders/Contract Documents
Sub-project layouts
Environment and Social Safeguards Due Diligence Report India Infrastructure Finance Company Ltd.
IIFCL/ESDDR/ADB/2019/110/V2 16 JUWMGL
Figure 1: JUWMGL Plant Location – MSW Processing Facility (A) and Landfill Site (B)
A
B
Environment and Social Safeguards Due Diligence Report India Infrastructure Finance Company Ltd.
IIFCL/ESDDR/ADB/2019/110/V2 17 JUWMGL
12. POLICY, LEGAL AND REGULATORY REQUIREMENT
25. This section briefly describes the policy, legal and regulatory requirements for implementing a
waste to energy project. MSW management requires assessment for applicability of Solid Waste
Management Rules, 2016; EIA Notification, 2006; Central Pollution Control Board Guidelines on
the Provision of Buffer Zones around Waste Processing and Disposal Facilities, 2017; Indian
Electricity Act 2003; Forest (conservation) Act, 1980; Wildlife (Protection) Act, 1972;
Water (Prevention and Control of Pollution) Act, 1974; Air (Prevention and Control of
Pollution) Act, 1981.
13. COMPLIANCE OF JUWMGL WITH ESSF OF IIFCL
26. The Environmental and Social Safeguard Framework (ESSF) provides the enabling mechanism to
IIFCL to deliver its policy objectives and applies to projects funded by IIFCL throughout the
project cycle. The ESSF defines procedures, roles, and responsibilities, at various project
milestones for managing the adverse environmental impacts.
27. The sub-project does not require obtaining environmental clearance as per Government of India’s GOI’s screening criteria for infrastructure development projects. Such projects do not require an environmental impact assessment. The environmental assessment of the site for JUWMGL was
conducted by the sub-project developer as part of the Prefeasibility study and Detailed Project
Report. On the basis of information provided in sub-project documents including prefeasibility and
detailed projects reports and site visit observations, an environmental examination was conducted
and description of the sub-project environment has been included in Section 16 of the ESDDR and
anticipated environmental impacts during construction and operation phase of JUWMGL have been
elaborated in Section 18 and 19 of the ESDDR. Appropriate planning instruments were developed
for the sub-project and Environmental Management Plans (EMP) was proposed in the DPR of
JUWMGL. Also, the Concession Agreement (CA) signed by JUWMGL has relevant clauses
related to EMP & environmental monitoring. The relevant clauses are, clause number 5.3
Environmental Compliance and clause 18 Safety and further details related to environmental
management and monitoring are available in the Schedules of CA. The relevant pages of the CA
are attached as Annexure VI. The effectiveness of the EMP implementation and monitoring plans
is elaborated in Section 21 of the ESDDR.
28. The sub-project is compliant to Government of India regulations and has adequate EMP
implementation on site. Therefore, it can be concluded that JUWMGL is compliant to the
requirements of IIFCL’s ESSF.
14. STATUS OF REGULATORY CLEARANCES
29. It is required that the sub-project meets the requirements of appropriate Indian legislations by
considering obligations and guidelines of regulatory authorities. The sub-project should have
Environment and Social Safeguards Due Diligence Report India Infrastructure Finance Company Ltd.
IIFCL/ESDDR/ADB/2019/110/V2 18 JUWMGL
necessary national and local clearances as well as permits and approvals for project implementation
and suitable environmental management plan should be applied. The statutory clearances related to
environmental aspects and to be obtained from regulatory authorities as part of the sub-project
development, were assessed and current status of availability of such clearances are given in Table
5.
Table 5: Statutory Clearances/Approvals/Permits required and present status
Clearance Required Statutory Authority Status Remarks
Environmental Clearance
Ministry of Environment,
Forests and Climate
Change (MoEFCC),
New Delhi
Not
Applicable
Not Applicable as power plants
upto 15 MW based on non-
hazardous municipal waste and
using auxiliary fuel such as coal,
lignite and petroleum products upto
15% are exempted from EIA
requirements. Clarification from
MoEFCC was issued to Ministry of
Urban Development vide DO letter
dated 3.07.2017 that when WtE
plants upto 15 MW are proposed on
existing landfill site they do not
attract the provisions of EIA
Notification, 2006.
Forest Clearance
Ministry of Environment,
Forests and Climate
Change,
New Delhi
Not
Applicable
The sub-project is not located in
forest area. The sub-project is along
the boundary of Kondaveedu
Reserve Forest, therefore, sub-
project developer has taken No
Objection Certificate from Forest
Department, Guntur Division,
Andhra Pradesh dated 3.10.2016
(Annexure VII).
The Wildlife Protection Act,
1972 & Biological Diversity
Act, 2002
Ministry of Environment,
Forests and Climate
Change,
New Delhi; National
Biodiversity Authority
Not
Applicable
Not required as project site does
not lie within or in close vicinity to
any National Park, Wild Life
Sanctuary or biodiversity rich area
as informed by project developer.
Consent for Establishment
Project Facility
Andhra Pradesh Pollution
Control Board
Available Consent for Establishment from the
State Pollution Control Board
under Section 25 of Water
(Pollution & Control of Pollution)
Act, 1974 and under Section 21 of
Air (Pollution & Control of
Pollution) Act, 1981 has been
granted to the sub-project vide
letter dated 20.03.2017 (Annexure
VIII).
Authorization under Solid
Waste Management Rules,
2016
Andhra Pradesh Pollution
Control Board
Available
Andhra Pradesh Pollution Control
Board has authorised JUWMGL for
municipal solid waste based WtE
plant of capacity of 15 MW power
generation and to produce other by-
products vide letter dated
Environment and Social Safeguards Due Diligence Report India Infrastructure Finance Company Ltd.
IIFCL/ESDDR/ADB/2019/110/V2 19 JUWMGL
30. Sub-project developer has informed that JUWMGL applied for approval of Terms of Reference for
taking up Environmental Impact Assessment (EIA) study for the project in 12.02.2018 to State
Level Environment Impact Assessment Authority (SEIAA) for environment clearance alongwith
other projects of JUIL awarded in the State of Andhra Pradesh. For JUIL’s sub-project located in
Vishakhapatnam District of Andhra Pradesh, SEIAA passed directive that it may not require
environmental clearance since it is only 15 MW capacity. Developer has informed that on the basis
of this decision by SEIAA and discussions of the sub-project developer with the Authorities, the
application for TOR was withdrawn for JUWMGL. Therefore, no EIA study was undertaken by the
sub-project developer for JUWMGL. This status is reflected on the MoEFCC website too.
04.05.2018 (Annexure IX).
Water Supply Permission
Municipal Corporation
Guntur
Available
Guntur Municipal Corporation has
granted assurance for 500 KLD
sewage treated water supply to
JUWMGL plant from nearest
sewage treatment plant at Etukur
whenever the plant comes into
operation vide letter dated
16.11.2016 (Annexure X).
Ground Water Permissions Andhra Pradesh Ground
Water and Water Audit
Department
Available Andhra Pradesh Ground Water
Department has granted permission
to JUWMGL for drawing water
from four bore wells at sub-project
location on 14.02.2017 (Annexure
XI).
Fire No Objection
Certificate
Andhra Pradesh State
Disaster Response and
Fire Services Department
Provisional
NOC
Available
Provisional No Objection
Certificate is issued to JUWMGL
on 07.05.2018 (Annexure XII).
Formal approval will be
obtained/issued before the plant is
operational.
Village Resolution Kondaveedu Village
Panchayat
Available Kondaveedu Village has passed
resolution for setting up of WtE
plant 2.10.2017 & 31.10.2017
(Annexure XIII).
Factories Act, 1948 Factories Department,
Government of Andhra
Pradesh
Available The factories plan has been
approved vide letter dated
25.07.2017 by Director of
Factories, Government of Andhra
Pradesh (Annexure XIV).
No Objection Certificate for
Height Permission
Airports Authority of
India
Available NOC has been granted by AAI on
17.05.2016 for height clearance
(Annexure IV).
Fuel Storage Permission Controller of Explosives
(CCoE), Government of
Andhra Pradesh
Available
Permission for fuel storage was
under process during site visit to
the sub-project. Fuel storage
permission has been granted vide
letter dated 27.05.2019 (Annexure
XV).
Environment and Social Safeguards Due Diligence Report India Infrastructure Finance Company Ltd.
IIFCL/ESDDR/ADB/2019/110/V2 20 JUWMGL
15. ALTERNATIVE ANALYSIS
31. JUIL was selected through a bidding process for development of WtE processing facilities in
clusters in Andhra Pradesh by New and Renewable Energy Development Corporation of Andhra
Pradesh Limited (NREDCAP). The site allocation was done by the ULB, therefore no site
alternatives were explored by JUWMGL. The site allocated for the sub-project are existing dump
yards used by the ULB since the year 2009.
16. DESCRIPTION OF THE ENVIRONMENT
32. The project area available for WtE facility is about 15.5 acres and 35.74 acres is available for
development of scientific landfill at Kondaveedu. The project site is situated on a highly undulating
terrain and on the down hills of two hillocks which form the western and northern boundaries. The
western boundary and some portions of northern boundary of the proposed site are along with the
boundary of Kondaveedu reserve forest.
33. The proposed project site for SLF facility is unevenly distributed. The proposed area has been
demarcated with cement poles and fencing from the GMC area & the private lands.
34. The project area comes under the jurisdiction of newly formed capital city, Amaravati of Andhra
Pradesh. The site is having red and brownish clayey sandy soil along with pebbles and boulders.
The proposed project area is situated 2.5 kilometres away from the National Highway 16, which is
connecting Guntur and Chennai. The project area is well connected by road with Vijayawada,
Amaravati and Chennai. The project is situated at a distance 52 km from Vijayawada and 45 km
from Amaravati. Guntur railway station is the major railway station which is 14 km from the
project site. Nearest airport is at Vijayawada and is about 67 km whereas Machilipatnam sea port is
100 km away from the project site.
35. The project area is situated on an undulating terrain and on the down hills of hillocks which forms
the boundary of the northern, western side of the proposed site, whereas eastern side is vacant land
and the proposed WtE site is the southern boundary. The land is sloping from northern to southern
directions. Some portion of the northern part having elevation is about 70 m, whereas southern part
of the site is varying from 56 - 57 m. The elevation of the western boundary of the proposed site is
almost flat and elevation varies from 59 – 60 m.
36. Waste dumping in the proposed project area is in practice since 2009. About 300 TPD of mixed
solid waste is being dumped in the project area. Legacy dump is available in the land allocated for
landfill.
37. The site evaluation as per location criteria specified in the Manual on Municipal Solid Waste
Management, Central Public Health and Environmental Engineering Organisation (CPHEEO),
Government of India, 2016, is given below:
Environment and Social Safeguards Due Diligence Report India Infrastructure Finance Company Ltd.
IIFCL/ESDDR/ADB/2019/110/V2 21 JUWMGL
Table 6: Assessment based on location criteria as per CPHEEO, Government of India
17. VISIT TO SUB-PROJECT LOCATION
38. As part of the preparation of the ESDDR, the sub-project was visited by Head-Environment &
Social Management Unit (ESMU), Environmental and Social Safeguard Specialists of IIFCL on
15th January 2019 for field verification of environmental safeguards. Consultation with the Project
Head and Health & Safety team was also done regarding safeguards implementation during the site
visit. The sub-project is currently in construction phase. The site visit photographs are given in
Photo Plate-I.
18. ANTICIPATED ENVIRONMENTAL IMPACTS DURING CONSTRUCTION PHASE AND
MITIGATION MEASURES
39. The proposed WtE project is not located in forest land or in close vicinity of any wild life
sanctuary/national park. The sub project is not located in eco-sensitive zones declared by the
Government. The impacts during construction phase and mitigation status thereon are elaborated
below:
40. Land Use: At present, the land allotted for the project (approx. 55 acres) is an existing landfill
site/dump yard being used by GMC since the year 2009. The area where the WtE facility is being
constructed was handed over to the sub-project developer by GMC after clearing. Hence the land
use pattern of the area is not changing due to coming up of the project. However, some temporary
Criteria CPHEEO Manual
Requirement
Description of the Site
Lake/Pond 200 m away from Lake/Pond One canal passes about 990 m
away
River 100 m away from the River Canal 990 m away
Highway or railway line 200 m away from highway NH 16, 2.2 km away
Public parks 300 m away from public parks No parks in close vicinity
Flood prone area No land fill in a 100 years flood
prone area
Sub-project located in hilly terrain
Habitation 200 m away from habitation
area
No habitations observed within
200 m from the site
Critical habitat area No landfill within critical habitat
area.
No critical habitat area
Airports No landfill within 20 km of
airports
Vijayawada airport is at a distance
of 67 km from site
Coastal regulatory zone Not in sight of project Not in vicinity of project location
Buffer Zone (No
development zone)
500 m for facilities dealing with
100 TPD or more of MSW
No development within buffer
zone
Environment and Social Safeguards Due Diligence Report India Infrastructure Finance Company Ltd.
IIFCL/ESDDR/ADB/2019/110/V2 22 JUWMGL
disturbances due to construction activity are anticipated during construction phase. The impacts are
temporary and will go after the construction activity is over. The construction activity is scheduled
to be completed by September 2019. Thus, the impact on land use during the construction work is
temporary and not significant in nature. After construction of the plant the aesthetics of the area
will improve as compared to the present scenario.
41. Air Quality: Construction activities involve excavation for construction of various facilities/units
of the sub-project. This will result in limited fugitive emissions at site. Spraying of water during
construction will reduce the dust fall to a great extent. The mitigation measures adopted by project
proponent to avoid air pollution include management of vehicular movement to avoid traffic
congestions, mechanical water sprinkling for suppression of dust, vehicle to comply with valid
PUC certificate.
42. Noise Levels: During construction phase, the sources of noise pollution will primarily be limited to
movement of vehicles transporting construction material and equipment to the site. The project site,
however, is not in closed vicinity to habitation area. Since the movement of traffic is not very
significant and away from settlement areas of villages; hence the villagers will not be affected due
to increased noise level. Use of low noise generating equipment and restriction of construction
activity for limited periods will further reduce the disturbance from noise pollution. JUWMGL to
procure machinery / construction equipment in accordance to the specifications confirming to
source noise levels.
43. Water Quality: The existing dump yard must be causing some impact on the ground water quality
in absence of any scientific method to curtail the water pollution. The water for construction is
being taken from the four permitted operational bore wells in the project area.
44. Soil: The excavation work involved in the project is limited to construction of foundation for
various units of the plant. The soil is envisaged to be used during construction activities. During
site visit, it was observed that soil was stockpiled on one side and used for making ramps etc.
45. Flora: The construction work may cause loss of vegetation. The sub-project is not located in forest
area or protected area, therefore minimum impact is anticipated on the flora. The site used by the
sub-project is already an existing dump yard with minimum vegetation. Project Head during site
visit informed IIFCL staff that total 972 saplings have been planted at the site and another 1000 are
planned.
46. Fauna: The existing land use for the sub-project site is existing dump yard. No forest areas are
falling in proposed project area and the sub-project is not part of any eco-sensitive areas like
national park or sanctuaries thereby no presence of rare and endangered species is anticipated.
However, stray cattle are anticipated to be around dump yard. Currently the proposed area has been
demarcated with cement poles and fencing from the GMC area and private lands.
Environment and Social Safeguards Due Diligence Report India Infrastructure Finance Company Ltd.
IIFCL/ESDDR/ADB/2019/110/V2 23 JUWMGL
47. Health and Safety: Developer has informed that about 400 labour are engaged during construction
phase. Civil contractor has taken private land of about 1 acre area for labour camp in the vicinity of
the sub-project location. Around 260 labour are housed in the labour camp. Other 140 labour for
boiler mechanical engineering works are staying in dormitories in two warehouses rented for the
purpose. The labours have been provided with toilet facilities, water supply through tankers and
electricity. Toilet facilities are also constructed at the project site for labour. A doctor is available at
the site every day for 2 hours for the labour. First aid kits are available at the site. Labour is
provided with personal protective equipment (PPE) while undertaking work at the site. Developer
has informed that job safety analysis, tool box talk, induction training and job specific trainings are
provided to staff. HSE related matters are being reported in the MPR of the sub-project. The safety
training conducted in the month of December 2018 are given below for sample purpose:
Tool Box Talk meetings conducted – 29; attended by 507 workers
Safety Induction Trainings – 10; attended by 113 workers
Job Specific Trainings conducted – 04; attended by 69 workers
48. Clause 24 of the work orders at JUWMGL are for safety/hygiene. In accordance to this clause the
contractor has to provide PPE to labour and ensure safety/hygiene for the labour. The clause also
mentions regarding arrangement of training programmes to be conducted before engaging any
worker on the job. There are penalty on the contractor for not complying safety norms at site.
49. General health check-ups are conducted regularly for all JUWMGL employees and contract
employees. Health register is maintained and recorded regularly for all employees. Medical camp
and health awareness campaign are organized in association with local hospitals periodically.
50. Cultural Sites: As informed by project developer, no archaeological, heritage, historical or
culturally important sites are located close to the proposed sub-project.
51. The project is being live monitored from Chief Minister, Andhra Pradesh Office.
52. The records of HSE related details are maintained in the Monthly Progress Reports of the sub-
project.
53. Quarterly reports on compliance of conditions of Authorization under Solid Waste Management
Rules, 2016 and Consent for Establishment of the facility are being submitted to the Andhra
Pradesh Pollution Control Board.
19. ANTICIPATED ENVIRONMENTAL IMPACTS DURING OPERATION PHASE AND
MITIGATION MEASURES
54. Land Use & Soil: Changes in land use pattern are envisaged once the sub-project is under
operation. At present area is a dump site for GMC. The WtE facility once operational will not
impact the land use pattern. The landfill will be used for disposal of process rejects and inerts
Environment and Social Safeguards Due Diligence Report India Infrastructure Finance Company Ltd.
IIFCL/ESDDR/ADB/2019/110/V2 24 JUWMGL
generated from WtE facility of JUWMGL. The process rejects include the bottom ash and residual
material generated during WtE process. The proposed landfill is designed for a period of 25 years
referring the terms and conditions mentioned in the concessionaire agreement and consent for
establishment order. The design concept involves appropriate procedure and safety considerations.
Liner and cover system has been proposed for the landfill site. Plantation to be done in sufficient
density to minimize soil erosion.
55. Air and Noise Quality: Air pollution is anticipated during operational phase of the WtE facility.
Unloading and processing of waste is not anticipated to generate dust and odour, since these
activities are carried out in covered areas. The air pollution control system shall be installed along
with the commissioning of the facility and shall comply with norms for controlling air pollution.
Emission control system is proposed at the WtE plant, the system will consist essentially of the
following major components:
Flue gas system inlet duct
Reactor and product recirculation system
Bag house filter
Sorbent handling system
End product handling system
Process water system
Auxiliary systems (compressed air system, nitrogen inerting system)
Fugitive emissions will be controlled by the following mitigation options during operation of the
WtE facility:
Maintaining and/or re-establishment of a grass cover on area where there is no ongoing
Activity
Frequent watering of unsealed roads and stockpile area- cover material
Blacktop of the roads as and when they are settled and ready for the same
Repair, relaying of blacktop roads from the landfill area to the main road
Using dust control sprays during loading and unloading of wastes
Ceasing dust generating activities during high wind times
Minimizing working distances for internal transport of wastes
Periodical monitoring of ambient air quality for all relevant parameters
Odour control by rapid stabilization and disposal of wastes
Outlet emissions are proposed to be monitored through sophisticated continuous emission
measuring instruments. The system will measure the following parameters - CO2, HCI, NO, NOx,
O2, SOx and SPM. Gas temperature and the pressure are also proposed to be analysed continuously
to regulate the dosing of sorbents. However, all other parameters would be monitored on weekly
basis. The control of the dioxins/furans and heavy metals – especially mercury – is performed by
means of adsorption on pulverized activated carbon. The activated carbon is injected into the
reactor together with the slaked lime.
Environment and Social Safeguards Due Diligence Report India Infrastructure Finance Company Ltd.
IIFCL/ESDDR/ADB/2019/110/V2 25 JUWMGL
Excessive noise shall be avoided by providing noise enclosure where reasonably practical. Hearing
protection is proposed to be worn by labour while working in high noise areas exceeding 85 dB.
The following strategies are proposed to be adopted to further minimize the noise levels:
Maintaining the site machinery in good operating condition
Regular maintenance of systems and installation of noise control equipment
wherever required
Development of green belt all around the site
Periodical monitoring of noise levels
56. Water Quality: Water quality including ground water is anticipated to be impacted during
operation phase of the sub-project if mitigation measures are not adopted. At the WtE processing
facility, leachate collection system and treatment facility is proposed. A concrete platform is
proposed to be constructed to prevent ground water contamination due to leachate. Leachate
generated shall be stored in an underground leachate tank and used for spraying on windrows to
maintain moisture level.
57. Leachate Treatment Process: Leachate treatment process has been designed for JUWMGL.
About 120 KL of leachate will be collected in collection tank through a network of perforated pipes
laid in the plant. About 35 KL of leachate will be used for ash quenching from intermittent
collection tank. The leachate treatment shall be carried out through various processes in tanks at the
facility for treatment and disposal. The process will include passing the leachate through
equalization tank followed by flash mixing, flocculation and anaerobic treatment. Further, the
leachate will be treated in aeration tanks followed by secondary clarification and ultra-filtration.
The sludge will be converted to cakes after thickening and belt press process.
58. Flora: The WtE plant in operation phase is not anticipated to have impact on vegetation in the area.
As per conditions of Forest Department NOC, 7.5 meters from the reserve forest land side is
proposed to be left. It is proposed by the project developer to develop a vegetative cover in a strip
of minimum 20 m width around the site boundary of scientific landfill facility. Greenbelts shall be
developed all around the boundary of the facility for MSW based on waste to energy plant. Project
developer has informed that about 33% of the area will be developed as green belt at project site.
Green belt will create overall positive impact on the aesthetics of the site.
59. Fauna: Construction of high level wall is proposed towards the reserve forest side of the sub-
project. This will keep the animals away.
60. Health and Safety: Risk analysis has been done at the project and safety measures proposed at the
site for staff. JUWMGL has listed activities which require risk assessment and work procedures.
Site personnel are to attend a site induction including briefing on the site rules and regulations. All
workers shall be equipped with proper PPE maintained in good condition. Hearing protectors shall
be worn in areas where noise levels exceed 85 dB. Respirators to be worn in contaminated
atmospheres. Equipment shall be used by trained personnel only.
Environment and Social Safeguards Due Diligence Report India Infrastructure Finance Company Ltd.
IIFCL/ESDDR/ADB/2019/110/V2 26 JUWMGL
20. ENVIRONMENTAL SENSITIVITY AND DUE DILIGENCE
61. The environmental sensitivity of the 15 MW WtE processing facility and landfill site has been
assessed by reviewing the project related documents like Detailed Project Report (DPR), various
permits/NOCs, health and safety related information, supplemented by field visit and consultation
with the concessionaire. The environmental sensitivity assessment is given below:
The WtE processing plant along with landfill is being developed on an existing dump yard of
Guntur Municipal Corporation (GMC). GMC has leased out 15.5 acres for MSW processing
facility and allotted 35.74 acres for landfill site.
The entire facility is being developed on government land.
No notified forest area is getting affected due to the sub-project. However, the sub-project is
along the boundary of Kondaveedu Reserve Forest, therefore, sub-project developer has
taken NOC from Forest Department, Guntur Division, Andhra Pradesh.
The sub-project sites are not located in any protected area like wildlife sanctuary / national
park or in close proximity of any eco-sensitive area.
During site visit and as per discussions with the sub-project staff, it was informed that no
wild animals are sighted in and around the sub-project area. There is no loss of bio-diversity
as there are no fauna species within the project area. As regards to the vicinity to reserve
forest certain mitigation measures are proposed by the sub-project.
As informed by the concessionaire, there are no important cultural / heritage sites are getting
affected due to the sub-project.
Labour working at the sites staying in a labour camp about 1 km from the sub-project site.
The area is leased land private land. Labour for boiler mechanical engineering works are
staying in dormitories in two warehouses rented for the purpose.
The impacts of the sub-project are manageable and temporary in nature. EMP is proposed to
mitigate and manage the environmental impacts at the sub-project in consultation with the
sub-project developer.
It is the responsibility of contractor to maintain safety and well-being of labour at site. Job
safety analysis is being done at the sub-project. Tool box talks, induction trainings and job
specific training are being provided to the work force.
Water is being sourced from authorized bore wells at site during construction phase. Treated
sewage water will be supplied through pipe lines during operation phase.
Environment and Social Safeguards Due Diligence Report India Infrastructure Finance Company Ltd.
IIFCL/ESDDR/ADB/2019/110/V2 27 JUWMGL
21. ENVIRONMENT MANAGEMENT PLAN
62. A consolidated EMP presented in this section which is being implemented at JUWMGL. The EMPs
proposed in planning documents as mentioned in Section 13 of the ESDDR is compiled in this section
and their effectiveness is assessed vis-à-vis the actual activities undertaken by the developer considering
environmental impacts. The major components of the EMP include:
Mitigation of potentially adverse impacts;
Monitoring during the project implementation and operation; and,
Institutional arrangements.
63. The environmental issues and suggested mitigation measures with institutional arrangements for
implementation and their compliance status are given in Table 7 and 8. The EMP and monitoring
plan is being implemented during construction phase. The actual status of implementation is
provided in Table 7. The assessment of implementation of EMP was checked through records
being maintained at JUWMGL and ground check during site visit. The EMPs are found to be
adequate and effective during the construction phase of JUWMGL. EHS Committee is formed at
the sub-project, which includes members from the Contractor’s side also. The Committee oversees the implementation of safety and management measures at the site.
Table 7: Environment Management Plan Implementation Matrix for Construction Stage
Potential Impacts Mitigation Measure Monitoring of mitigation Responsibility Status of
Implementation Air Quality Spraying water when
necessary to suppress
dust and fugitive
emissions;
All vehicles to
possess a valid
pollution control
certificate;
Periodic monitoring of
ambient air quality for
all relevant parameters
in the plant area
JUWMGL Water is being
sprinkled at site to
suppress dust and
fugitive emissions.
Developer has
confirmed during site
visit that all vehicles
possess a valid
pollution control
certificate. Air quality
monitoring is being
done at seven
locations in and
around project site
and the parameters
are found to be
within prescribed
limits.
Flora and Fauna Minimize removal of
vegetation
Green belts to be
developed around
boundary of
periphery
Prohibit employees
7.5 meters from the
reserve forest land side
to be left
Record of plantations
to be maintained at site
Fencing shall be done
around the entire
JUWMGL Fencing has been
done and is being
maintained at the
sub-project.
Green belt is being
developed in and
around periphery of
Environment and Social Safeguards Due Diligence Report India Infrastructure Finance Company Ltd.
IIFCL/ESDDR/ADB/2019/110/V2 28 JUWMGL
from poaching and
cutting of trees for
firewood.
periphery of the
facility to keep stray
animals away
Record of saplings
planted and survival
rate to be kept
Employees to be
supervised and
sensitized towards
cutting of trees and
poaching
JUWMGL. Records
are maintained at
site. Monthly EHS reports
are maintained at
site.
Surface water
quality Stockpiling of earth
fill shall be avoided
unless covered
during the monsoon
season
Prioritize re-use of
excess spoils and
materials in the
construction works.
Install temporary silt
traps or
sedimentation basins
along the drainage
leading to the water
bodies
Disposal of any
wastes generated by
construction
activities shall be
done in designated
sites
Surface quality
monitoring to be done
JUWMGL Surface water quality
monitoring is done at
four locations in and
around the project
site.
Ground water quality
monitoring is being
done at six locations. The water quality
parameters are found
to be within limits,
except that water is
alkaline at few
locations.
Noise Levels Construction
activities with the
greatest potential to
generate noise shall
be conducted during
periods of the day
which will result in
least disturbance;
Restriction of
vehicular movement
at a speed limit for
minimum noise
Procuring
machinery/
construction
equipment in
accordance to the
specifications
confirming to source
noise levels
Maintain maximum
sound levels not
Noise quality
monitoring to be done
JUWMGL Noise quality
monitoring is done at
the site and noise levels
are found to be within
limits.
Environment and Social Safeguards Due Diligence Report India Infrastructure Finance Company Ltd.
IIFCL/ESDDR/ADB/2019/110/V2 29 JUWMGL
Table 8: Environment Management Plan Implementation Matrix for Operation Stage
exceeding 80
decibels (dbA) when
measured at a
distance
Buffer zone around
facility Buffer zone area to
be left as per layout
approval of State
Pollution Control
Board
Green belt buffer to
be maintained in
view of public safety
Plantation records to be
maintained
JUWMGL Buffer zone will be
maintained as per AP
Pollution Control
Board directive to
the sub-project
attached as
Annexure XVI.
Green belt is being
developed in and
around periphery of
JUWMGL. Records
are maintained at
site.
Health & Safety Labour shall be
provided with PPE
First aid kits and
doctor shall be
available at site
Job safety analysis,
tool box talk,
induction training
and job specific
trainings shall be
provided to staff
Continuous inspection
shall be done at site by
Contractor
HSE related matters
are shall be reported on
monthly basis
Sub-contractor;
JUWMGL Monthly EHS reports
are maintained at
site.
Tool box talks, safety
induction trainings,
mass trainings, job
specific trainings,
equipment
inspection, accident
reports etc are
reported in monthly
EHS reports.
First aid kits are
maintained at site
and a doctor visits
site every alternate
day. The doctor is
available round the
clock on call. General health
checkups are done
for JUWMGL
employees and
contractors staff at
the sub-project.
Potential Impacts Mitigation Measure Monitoring of mitigation Responsibility
Air Quality
Due to emissions
from vehicles
transporting MSW
from ULBs
Flue gas emissions
from WtE facility
All vehicles to possess a valid
pollution control certificate;
Maintaining and/or re-
establishment of a grass cover on
area where there is no on-going
activity
The approach and internal roads
Periodic monitoring of
ambient air quality for
all relevant parameters
in the plant area
Continuous emission
monitoring of outlet
emissions
ULBs for vehicles
transporting waste
JUWMGL
Environment and Social Safeguards Due Diligence Report India Infrastructure Finance Company Ltd.
IIFCL/ESDDR/ADB/2019/110/V2 30 JUWMGL
shall be concreted or paved to
avoid dust generation due to
movement of vehicles
Using dust control sprays during
loading and unloading of wastes
Air Pollution Control system as
defined in the DPR of the sub-
project (as given in para 51 of
ESDDR)
Green belt shall be
developed all along the
boundary and vacant
spaces in not less than
33% of the total area
with indigenous species
Noise Quality Site machinery shall be
maintained in good operating
condition
Regular maintenance of systems
and installation of noise control
equipment wherever required
Development of green belt all
around the site
Periodic monitoring of
noise levels
JUWMGL
Odour problem due to
MSW Waste to be transported in
covered vehicles
Unloading as well as processing
of the waste to be carried out
under covered areas.
Odour control by rapid
stabilization and disposal of
wastes with daily cover
placement
Odour nuisance at down
wind direction on the
boundary of processing
plant shall be checked
regularly
Records to be
maintained
ULB for transportation
of waste
JUWMGL
Water consumption &
Quality Leachate treatment plan shall
include leachate collection and
treatment system including of :
influent leachate collection tank;
bar screens; oil & grease
chambers; anaerobic reactor;
secondary clarifier; aeration
tanks; carbon filter; ultra-
filtration; sludge thickener; belt
press etc.
Treated leachate shall be recycled
or utilized after meeting
standards as specified by
Pollution Control Board
Water from Cooling systems will
be neutralized in the neutralized
pit and utilized
Surface water quality
and treated leachate
quality monitoring shall
be done both at WtE
facility and landfill site
Ground water quality to
be monitored within 50
m of periphery covering
different seasons
Water consumption
records to be kept
JUWMGL
Buffer zone around
facility Buffer zone area to be left as per
layout approval of State Pollution
Control Board
Green belt buffer to be
maintained in view of public
safety
Green belt shall be
developed all along the
boundary and vacant
spaces in not less than
33% of the total area
JUWMGL
Health & Safety of
workers Good housekeeping to be
maintained at the plant
Tool box talks, induction
trainings shall be conducted
Workers shall be provided with
Training and health
records to be maintained
at site
Accident/incident
reports to be maintained
JUWMGL
Environment and Social Safeguards Due Diligence Report India Infrastructure Finance Company Ltd.
IIFCL/ESDDR/ADB/2019/110/V2 31 JUWMGL
22. INSTITUTIONAL FRAMEWORK FOR EMP IMPLEMENTATION
64. JUWMGL has adequate institutional arrangement to oversee the implementation of health, safety &
environment (HSE) related aspects at the sub-project. The Senior Engineer (Safety) reports to Assistant
Manager (HSE) who directly reports to the President Projects. The EMP implementation during the
construction stage shall primarily be the responsibility of the contractor which will be constantly
monitored by the project team of JUWMGL. The project team of JUWMGL consists of managers
supported by engineers and operators. AM (HSE) and Senior Engineer (Safety) are responsible for
project execution and shall be responsible for environment management, monitoring health and safety
issues, etc.
23. CATEGORIZATION OF SUB-PROJECT
65. The sub-project can be classified as category B based upon ADB’s requirements as per Safeguard
Policy Statement (2009). This classification is based on the review of the available documents and site
visit with respect to the environmental sensitivity due to project activities.
24. PROJECT AGAINST THE PROHIBITED INVESTMENT ACTIVITIES LIST
66. The sub-project does not involve any prohibited activity as per the Prohibited Investment Activities
List (PIAL) of ADB.
25. PUBLIC CONSULTATION AND INFORMATION DISCLOSURE
67. Sub-project developer has conducted a stakeholder consultation with participants from the catchment
area on 24.11.2016. The sub-project purpose, features and benefits were explained in detail to the local
population. This was done with the help of the project model being displayed during the stakeholder
consultation meet. This was done to allay fears and apprehensions of people and look into the objections
or suggestions related to the sub-project.
PPE
Hearing protectors shall be worn
in areas where noise levels
exceeds 85 dB
Respirators shall; be worn in
contaminated areas
All pipe valves, sewers, drains
shall be leak proof
Dyke walls shall be constructed
around storage of chemicals/fuels
Fire-fighting equipment shall be
installed all over the plant
at site
Fire-fighting
system/equipment
maintenance records
Environment and Social Safeguards Due Diligence Report India Infrastructure Finance Company Ltd.
IIFCL/ESDDR/ADB/2019/110/V2 32 JUWMGL
26. GRIEVANCE REDRESSAL MECHANISM
68. As informed by the project proponent, they have to constitute their own Grievance Redressal
Mechanism (GRM) to sort out issues and concerns early at the ground level. If some grievances/issues
come to them, they first try to resolve it through site-in-charge, if not resolved then it is forwarded at the
President Projects level and finally to the Head Office. The Project proponent is advised to keep a
grievance register at site gate for taking up complaints/concerns of the general public, if any.
27. SITE VISIT OBSERVATIONS
69. A site visit was undertaken by IIFCL’s Head-ESMU, Environmental and Social Safeguard
Specialists on 15th January 2019. The site visit was undertaken to review the implementation of the
project’s environmental and social safeguards. During the site visit, following staff was mainly
consulted regarding environmental safeguards related measures implemented at JUWMGL project
site:
(a) Mr. M.V. Chary, President AP Projects
(b) Mr. Ravi Sankar Paladi, AM – HSE, JUWMGL
70. At project office at site, President-Projects Mr. M.V. Chary and HSE in-charge at site discussed
project features, progress of the sub-project so far, clearances, environment & social safeguards
related aspects of JUWMGL project. Based on the discussions with above mentioned officials and
visit, the site observations are given below:
The permits and NOCs required for the sub-project are in place. Sub-project staff
explained the status of pending clearances/permits to IIFCL staff.
The sub-project site for WtE processing plant and landfill site are side by side and both
were visited by IIFCL team. Legacy waste could be seen dumped at the dump yard site
which will be used for landfill purpose.
The developer informed that the sub-project does not involve any forest land, protected
area, sites of cultural and heritage importance.
Developer showed the reserve forest area boundary. No encroachment or spillage of
construction material was seen along the boundary of forest area. JUWMGL has dug
drains along the periphery of the area towards the forest and barbed wire fencing/wall is
proposed to be built along the boundary of the forest.
Land for WtE processing unit was handed over to the sub-project after clearing by GMC.
Environment and Social Safeguards Due Diligence Report India Infrastructure Finance Company Ltd.
IIFCL/ESDDR/ADB/2019/110/V2 33 JUWMGL
Developer informed that most of the machinery and equipment have been received at the
site. Civil, mechanical and electrical works are in full swing at JUWMGL site. The
project is expected to be commissioned by September 2019.
The area under construction was cordoned off with signage strip for safety purpose.
Water for construction is being sourced from permitted bore wells at site. Water during
operation phase will be sourced from nearest STP, for which assurance has been given in
writing by respective authorities. Developer has informed that pipeline for STP water will
be installed for uninterrupted supply.
Labour was seen wearing PPE.
A dispensary is built at the site with basic facilities. First aid kits were available at the
site. Doctor visits the site every alternate day for two hours.
A total of 972 saplings have been planted at the site. Most of the plantations are along the
periphery of the WtE plant and landfill site. The saplings are being watered. Project staff
informed that they have planned for another 1000 number of plantations in coming
months. Green belt will be developed as per the management plan.
One labour camp for about 400 labour has been established by the main civil contractor
on leased private land about 1 km away from the sub-project site. Accommodation is
provided in sheds with common toilet facility. No community kitchen was provided at the
camp. The labour had independent kitchens with kerosene stoves. Water through water
tankers is provided to the labour. Electricity is also available in the labour camp. The
sanitation situation the labour camp needs improvement, which was informed to the sub-
project developer during site visit.
Developer has informed that general health check-ups are conducted regularly for all
JUWMGL employees and contract employees and health register is maintained and
recorded regularly of all employees.
Sub-project is complying with the conditions of Andhra Pradesh Pollution Control Board.
Continuous emission monitoring system will be installed at the WtE facility on
commissioning.
Live monitoring of the sub-project progress is being done by Chief Minister Office,
Andhra Pradesh.
71. The site visit photographs are given in Photo Plate-I.
Environment and Social Safeguards Due Diligence Report India Infrastructure Finance Company Ltd.
IIFCL/ESDDR/ADB/2019/110/V2 34 JUWMGL
28. CONCLUSIONS AND RECOMMENDATIONS
72. Based upon the available documents, information and site visit of JUWMGL, it is concluded that
JUWMGL has undertaken adequate safety and environmental safeguard measures. The conclusions
for the sub-project are given below:
The sub-project has been prepared by JUWMGL as per its own funding requirement and not
in anticipation to ADB operation;
The sub-project has necessary national and local level clearance as well as permits and
approvals for project implementation;
The sub-project is being implemented on existing dump yard of the GMC;
JUWMGL is not located in forest land and away from human settlement; the project site
does not fall within or in close vicinity to any national park, wildlife sanctuary,
archaeological, heritage, historical or culturally important sites and no rare and endangered
species of flora and fauna are present in the project impacted area.
Concessionaire has confirmed that all statutory clearances/approvals/permits are obtained by
JUWMGL;
JUWMGL has adequate environment and safety staff for implementation of environmental
mitigation and safety measures during construction;
Commitment is shown by the developer to execute all construction and operation related
activities for JUWMGL as per the established environment standards;
The developer has been informed to implement EMP in structured manner. Developer has
been advised to conduct monitoring and maintain records as per EMP requirement during
construction and operation phase;
Concessionaire has confirmed that they will continue compliance with the terms and
conditions stipulated according to statutory clearances/approvals/permits;
Based on the due diligence findings, the sub-project developer has taken adequate measures
for safety and environmental management, so it can be deduced that the sub-project has no
significant environmental safeguard issues.
Regular field verification will be undertaken by IIFCL safeguards team to assess and confirm
compliance with the agreed environmental measures by the concessionaire, including
carrying out public consultations during execution.
Environment and Social Safeguards Due Diligence Report India Infrastructure Finance Company Ltd.
IIFCL/ESDDR/ADB/2019/110/V2 35 JUWMGL
73. The current sub-project therefore does not appear to involve any kind of reputational risk to ADB
funding on environmental safeguards and recommended for funding under the proposed project.
Environment and Social Safeguards Due Diligence Report India Infrastructure Finance Company Ltd.
IIFCL/ESDDR/ADB/2019/110/V2 36 JUWMGL
DUE DILIGENCE ON SOCIAL SAFEGUARDS
Environment and Social Safeguards Due Diligence Report India Infrastructure Finance Company Ltd.
IIFCL/ESDDR/ADB/2019/110/V2 37 JUWMGL
29. PURPOSE OF THE SOCIAL SAFEGUARDS DUE DILIGENCE:
74. The Social Safeguards Due Diligence Report (SSDDR) has been carried out by India Infrastructure
Finance Company Limited (IIFCL) in consultation with the Concessionaire, Jindal Urban Waste
Management (Guntur) Limited (JUWMGL) to assess the Social safeguards adequacy of the project
with the applicable National Policies. The report has been prepared as per the
documents/information received from the concessionaire and on the basis of site visit organized
during 14th
and 15th of January 2019. The information given in the SSDDR is agreed and
confirmed by the Concessionaire.
30. PROJECT AGAINST THE PROHIBITED INVESTMENT ACTIVITIES LIST:
75. The sub - project JUWMGL does not involve any prohibited activity as per the Prohibited
Investment Activities List (PIAL) of ADB.
31. OBJECTIVE OF SOCIAL SAFEGUARDS DUE DILIGENCE:
76. Social Safeguards due diligence study is carried out to assess the social safeguards monitoring
compliance status of the project as per the applicable National policies/procedures as observed
during the site visit as well as the information received. The main objective of this Social
Safeguard Due Diligence Report (SSDDR) is,
To assess the likely social impacts and its minimization/mitigation majors adopted of the
project with respect to land acquisition, compensation and involuntary resettlement,
common properties, if any, in terms of displacement, loss of incomes, and community
links:
To ascertain, in case of any adverse impact, if appropriate mitigation measures have been
taken during the project planning, designing and frameworks established for carrying out
safeguard measures during the implementation stage to minimize and mitigate such if any
adverse impacts;
32. APPROACH AND METHODOLOGY:
77. The social due diligence report for the project has been initiated after review of Information
Memorandum (IM), DPR, all other clearances, licenses, Gazette notification and notice under
Indian Telegraph Act, 1885. On site visit and detail consultation/discussion with the project
developer NRSSTL and various permits and approvals relating to the project to understand the
Environment and Social Safeguards Due Diligence Report India Infrastructure Finance Company Ltd.
IIFCL/ESDDR/ADB/2019/110/V2 38 JUWMGL
salient features of the project and various social concerns. The following
documents/Reports/Licenses and notifications were referred in order to prepare the Social
Safeguard Due Diligence Report:
Project Information Memorandum (PIM)
Detailed Project Report (DPR)
Lender’s Independent Engineer’s Report for quarter ending December 2018 Project Statutory Approvals
Project HSE Documents
Concession Agreement(CA)
Power Purchase Agreement (PPA)
Land allotment/lease agreement
Labour License
EPC Work Orders/Contract Documents
Sub-project layouts
Discussion with developer.
33. STAKE HOLDERS CONSULTATION:
78. Stake holder’s consultation was organized on 24/11/2016 during the project planning and preparation stage of the project at Kondaveddu village (Kothapalem), Edlapadu Mandal, Guntur
District. During the stake holders’ consultation project authority has briefed about the project for
establishing 15 MW Capacity waste to energy plant at Kondaveedu village. The details of the stake
holders consultation was given in Photo Plate-II. Further, the project Jindal Urban Waste
Management (Guntur) Limited (JUWMGL) has received village Panchayat NoC for the project.
The Sarpanch of the Village Panchayat Kondaveddu revenue village (Kothapalem), Edlapadu
Mandal, Guntur District has issued A-1 Notice to the project. As per the notice the project has not
received any objection from the local people and no objections has issued to the project JUWMGL
by the panchayat. The panchayat resolution was attached as Annexure XIII.
34. SOCIAL IMPACT OF THE PROJECT:
34.1 Impact on Structure:
79. The project site location was allocated by the ULB and the site allocated for the sub-project was
existing dump yards used by the ULB. As informed by the concessionaire and noted during the site
visit, no structure is getting affected due to the project.
Environment and Social Safeguards Due Diligence Report India Infrastructure Finance Company Ltd.
IIFCL/ESDDR/ADB/2019/110/V2 39 JUWMGL
34.2 Land Acquisition in the Project:
80. Based on the availability of land and location of existing dump yards, the waste to energy project
JUWMGL has located at Kondaveddu revenue village (Kothapalem). The project site is currently
being utilised as dumping yard/landfill site by Guntur Municipal Corporation.
81. The total land required for the project is 51.24 acres out of which 15.5 acres is for plant and 35.74
acres is for dumping yard. The project is being developed on Government land. Guntur Municipal
Corporation signed a lease agreement with Jindal Urban Waste Management (Guntur) Ltd.
(JUWMGL) on 19.07.2018 for an area of 15.5 Acres for setting up a MSW projects for a period of
25 year on lease basis. As per the land lease agreement land cost per acre is Rs. 33.80 Lakhs,
including all taxes. The lease rentals shall be enhanced in every block of 5 years by increasing 10%
on the lease rental of the previous block of 5 years. The detail of the lease is attached as Annexure
XVII.
82. The Govt. of Andhra Pradesh has accorded permission for the existing dump yard site having an
area of 35.74 acres has also been allotted to JUWMGL by Municipal Corporation, Guntur vide
letter dated 12.04.2017, for establishment of development and operation for storage of residue as
per Concession Agreement on free of cost basis for a period of 25 year. The Government order on
land allotment is attached as Annexure I.
83. Although there was no involuntary land acquisition in the project and all the required land for the
project is government land, allocated by the Government of Andhra Pradesh by signing of the land
lease agreement (15.5 acres) and free of cost basis (35.74 acres). Land acquisition process was
initiated prior to IIFCL’s involvement and not in anticipation of ADB financing and that IIFCL was not involved in the rehabilitation and resettlement activities of project if any.
34.3 Resettlement impact in the sub-project
84. During the site visit it was observed that, there is no a commercial / residential structure or
inhabitants dwelling on the site. The project site are so identified that the project location is far
from the habitation. Even it was also observed during the site visit that there were no temporary
shelters/sheds at the project site. The land leased for the project doesn’t result in any involuntary resettlement impacts or any compensation issues.
34.4 Impact on Schedule Tribe people:
85. As confirmed by the subproject developer that, the project has not affect the livelihood, culture of
the residents of the villages. Moreover, the land where the JUWMGL project is constructed,
was not owned, used, occupied, by any tribal group and not affect tribal people.
Environment and Social Safeguards Due Diligence Report India Infrastructure Finance Company Ltd.
IIFCL/ESDDR/ADB/2019/110/V2 40 JUWMGL
34.5 Impact on Common Properties Resources (CPR):
86. It was observed during the site visit that no common property resources are affected because of this
project JUWMGL.
35. GRIEVANCE REDRESSAL MECHANISM:
87. As informed by the project developer no grievance was received by the project proponent, however
they have formed their own grievance mechanism in place. During the site visit it was informed,
that Grievance Redressal Committee (GRC) will constitute at the project site to ensure that the
affected person’s grievances, on both environmental and social concerns, are adequately addressed.
During the site visit it was advised that the project proponent has to keep a grievance register at site
gate for taking up complaints/concerns of the general public, if any.
36. LOCAL EMPLOYMENT:
88. During the discussion it was told that the project provides limited employment opportunities to the
local people during the construction stage, especially with respect to unskilled labor. The nature of
work requires specialized skill for the highly technical work such as establishment of plants and
boilers. Local people normally do not have such experience. Thus, the contractors working for
construction of plants and establishment of machineries have their own gang of skilled labour who
are trained in similar activities.
89. Further, as informed by the sub project developer the contractors have given job opportunity to
local people giving them as security guard, driver and office assistants and where ever required
developer has assured to provide employment opportunities to local people. Out of the total work
force of 275 more than 150 people are employed from local area.
37. LABOUR LICENSE OBTAINED BY THE SUBPROJECT DEVELOPER:
90. The subproject developer Jindal Urban Waste Management Guntur Ltd. has received the Labour
license from the Govt. of Andhra Pradesh, Labour Dept. for construction of waste to energy plant
at Kondaveedu village, Edlapadu Mandal, Guntur. The Deputy Commissioner of Labour, AP has
issued the certificate under section 2 (d) and 4 (2) of Section 7 of the Contract Labour (R&A)
(Regulation & Abolition) Act, 1970 and Inter State Migrant Workmen (RE &CS) Act. 1979. The
detail of the labour licenses for 390 workmen is attached as Annexure II.
91. The labours are covered under group Janata Personal Accident Insurance benefit. The detail of
accident insurance is given in Annexure III. Further, the project developer has also has registered
Environment and Social Safeguards Due Diligence Report India Infrastructure Finance Company Ltd.
IIFCL/ESDDR/ADB/2019/110/V2 41 JUWMGL
under the Employees’ State Insurance Corporation (ESIC) for benefits of social security benefits
for employees start with their first day on job and some other benefits have conditions to complete
certain time period on job. Under ESIC, Medical benefits of family, dependent benefits, Funeral
benefits or death benefits will be application on candidate from their first day of joining in the
company. If a candidate having per month salary of less than 21000 Rs. then he/she will be entitled
in ESIC scheme. And in this 1.75% is contributed by Employee and 4.75% will be contributed by
your employer in the ESIC account. The detail of ESIC is attached as Annexure XVIII.
38. DISCLOSURE:
92. The information given in the ESDDR is agreed and confirmed by the Concessionaire. On approval
by the ADB, the report will be uploaded for public disclosure in IIFCL’s website as well as ADB’s website.
39. SITE VISIT OBSERVATION:
93. As part of the preparation of the ESDDR, the sub-project was visited by Head-Environment &
Social Management Unit (ESMU), Environmental and Social Safeguard Specialists of IIFCL on
15th January 2019 for field verification of environmental safeguards. Consultation with the Project
Head and Health & Safety team was also done regarding safeguards implementation during the site
visit. The sub-project is currently in construction phase. The site visit photographs are given in
Photo Plate-I.
The project is on construction stage;
As informed during the visit, no grievances have been received till date from the local people.
Local people have been given employment opportunity for unskilled and semi-skilled activity
during the construction activity.
40. CONCLUSIONS AND RECOMMENDATIONS:
94. The sub-project has been prepared by Jindal Urban Waste Management Guntur Ltd. which appears
adequate social safeguard have been taken into consideration during project planning and
implementations.
The Waste to Energy Project for 15 MW capacity is an integrated cluster facility for
processing Municipal Solid Waste (MSW) covering the area under nine ULBs including
Vijayawada and Guntur Municipal Corporation as well as other seven Municipalities in the
cluster at the door of the facility.
Environment and Social Safeguards Due Diligence Report India Infrastructure Finance Company Ltd.
IIFCL/ESDDR/ADB/2019/110/V2 42 JUWMGL
During discussion with the project official it was informed that, no tribal people are
affected because of the project.
No involuntary land acquisition in the project and all the required land for the project is
government land, allocated by the Government of Andhra Pradesh by signing of the land
lease agreement (15.5 acres) and free of cost basis (35.74 acres) allocated by Govt. of AP.
Land allocation process was initiated prior to IIFCL’s involvement and not in anticipation
of ADB financing and that IIFCL was not involved in the rehabilitation and resettlement
activities of project if any.
The sup project, JUWMGL has been prepared prior to the ADB’s involvement and IIFCL entered into the project after technical closure and before the financial closure of the
project.
The subproject JUWMGL was prepared by Govt. of AP for its own requirement not in
anticipation of ADB’s procedure.
95. It seems that the sub-project does not appear to involve reputational risk to Asian Development
Bank funding on social safeguards and recommended for funding under the proposed project.
GOVERNMENT OF ANDHRA PRADESH ABSTRACT
Lands- Guntur District- Alienation of land to an extent of Ac.51.24 cents (classified as Govt. Land (AWD) in Sy.No.933 to an extent of Acs.6.54 cts, Sy.No.938, Ext. Ac.8.96 cents, Sy.No.947 Ext.Ac.6.60cents, Sy.No.949 Ext.Ac.3.66 cents, Sy.No.951 Ext:Acs.7.20 cents, Sy.No.952, Ext. Ac.16.64 cents, Sy.No.954 Ext: Ac.1.64 cts etc., Govt. land (AWD) of Kondaveedu (V) Edlapadu (M),Guntur District in favour of Municipal Administration & Urban Development Department for establishment of Compost yard for the purpose of Municipal Corporation, Guntur on free of cost basis, subject to issue of notification U/s 4 (1) (c) of A.P. Assigned Lands (POT)Act 1977 for utilizing the same for public purpose, subject to certain conditions – Orders - Issued. ================================================================
REVENUE(ASSIGNMENT-II) DEPARTMENT
G.O.MS.No. 509 Dated: 14-11-2017 Read the following
1.From the Collector, Guntur District Rc.No.4426/2017-E1, dated:21.03.2017.
2.From the CCLA’s ref.No.Assn I(1)/217/2017, Dated:30.06.2017.
O R D E R
The District Collector, Guntur in his letter 1st read above has submitted proposal for transfer of land in Sy.No.933 (classified as AWD) to an extent of 51.24 cents, i.e., in Sy.No.933 - Ac.6.54 cents, Sy.No.938-Ac.8.96 cents, Sy.No.947 – Ac.6.60 cents, Sy.No.949 – Ac.3.66 cents, Sy.No.951 – Ac.7.20 cents, Sy.No.952 – Ac.16.64 cents, Sy.No.954 – Ac.1.64 cents, situated in Kondaveedu Village, Edlapadu Mandal, Guntur District on free of cost basis in favour of Municipal Administration & Urban Development Department for establishment of Compost yard for Municipal Corporation, Guntur and to establishment of Waste to Energy Project by generating the Electricity from the solid waste by recycling process for Government purpose in accordance with G.O.Ms.No.571, Rev(Assn.I) Dept, dt.14.09.2012. He has further stated that the Basic Value of surrounding Sy.Nos., is Rs.22,00,000/- per acre and the Prevailing Market Value within the vicinity of the proposed lands is @ Rs.30.00 lakhs per acre, the total value of the land Ac.51.24 cents is comes to Rs.15,37,20,000/- and recommended to allot the subject land on free of cost basis. The District Collector, Guntur has further stated that the Joint Collector, Guntur has inspected the proposed land to an extent of Ac.51.24 cents situated in Sy.Nos.933, 938, 947, 949, 951, 952 and 954 of Kondaveedu Village of Edlapadu Mandal along with Tahsildar, Edlapadu and field level staff. The land is covered with deep quarrying pits and is being used as dumping yard by the Municipal Corporation, Guntur. It lies adjacent to Guntur Mandal on one side and to Kondaveedu Village on the other side. There are no habitations nearby and the land of Ac.51.24 cents is situated on western side of National Highway within a distance from 2.5 Kms which is proposed for use of dumping yard. No structures, no trees and no water bodies are there on the proposed land. A1 notice was published and no objections were received. The Gram Panchayat, Kondaveedu also passed resolution for transfer of the land.
2. The Chief Commissioner of Land Administration in his letter 2nd read above, has stated that the proposal of the District Collector, Guntur has been placed before the APLMA in its meeting held on 29.07.2017 and the APLMA has resolved to “recommend to the Government as proposed by the District Collector, Guntur for transfer of land on free of cost subject to notification of land u/s 4 (1) (c) of A.P. Assigned Lands (POT) Act, 1977 to an extent of Ac.51.24 cents in Sy.Nos.933, 938, 947, 949, 951, 952 and 954 in favour of
Municipal Administration & Urban Development Department for establishment of Compost yard for the purpose of Municipal Corporation, Guntur, subject to certain conditions.
3. Government after careful examination hereby order for alienation of land to an extent of Ac.51.24 cents (classified as Govt. Land (AWD) in Sy.No.933 to an extent of Acs.6.54 cts, Sy.No.938, Ext. Ac.8.96 cents, Sy.No.947 Ext.Ac.6.60cents, Sy.No.949 Ext.Ac.3.66 cents, Sy.No.951 Ext:Acs.7.20 cents, Sy.No.952, Ext. Ac.16.64 cents, Sy.No.954 Ext: Ac.1.64 cts etc., Govt. land (AWD) of Kondaveedu (V) Edlapadu (M),Guntur District in favour of Municipal Administration & Urban Development Department for establishment of Compost yard for the purpose of Municipal Corporation, Guntur for Government purpose on free of cost basis, subject to issue of notification U/s 4 (1) (c) of A.P. Assigned Lands (POT)Act 1977 for utilizing the same for public purpose, subject to the following conditions in addition to the conditions under BSO – 24 and GO Ms.No.571, Revenue(Assn.I) Dept., dt.14-09-2012.
i. The land shall be utilized for the purpose for which it is allotted within three years of the orders for the alienation.
ii. The land will be resumed to Government in the event of failure to comply with the terms and conditions of alienation.
iii. The water bodies if any existing in the land should not be disturbed and should be allowed to continue their natural course.
iv. The existing roads/rasthas should not be disturbed.
4. The Special Chief Secretary & Chief Commissioner of Land Administration and the District Collector, Guntur shall take further necessary action accordingly in the matter.
(BY ORDER AND IN THE NAME OF THE GOVERNOR OF ANDHRA PRADESH)
Dr.MANMOHAN SINGH
SPECIAL CHIEF SECRETARY TO GOVERNMENT To The Special Chief Secretary & Chief Commissioner of Land Administration, Gollapudi, Vijayawada, A.P. The District Collector, Guntur.
Copy to: The PS to Spl.Chief Secretary to Hon’ble CM. The OSD to Hon’ble Dy.CM(Rev). The PS to Chief Secretary. The PS to Spl.Chief Secretary (Rev). The G.A(Cabinet) Department (w.r.t.U.O.No.447/2017, dt.07.11.2017). S.F.
//FORWARDED::BY ORDER//
SECTION OFFICER
THE NEW INDIA ASSURANCE CO. LTD. (Government of India Undertaking)
GROUP JANATA PERSONAL ACCIDENT INSURANCE POLICY (IRDA/NL-HLT/NIA/P-PN.1/56/14-15)
Insured's Name : CEEKAY ASSOCIATES PVT.LTD.
Insured's Details Issuil
Office Code :
Office Details
BAREILLY (340200) Customer ID : P054437419
Address : NAIDUPETA CHILAKALURIPET ROAD,JINDAL URBAN WASTE MANAGEMENT ,GUNTUR,
GUNTUR ,ANDHRA PRADESH, 500601
Address IIND FLOOR, RAGHUVANSHI COMPLEX 85-A, CIVIL LINES BAREILLY,243001
Phone No Phone No : 0581-2477764 / 2571677
E-mail/Fax ceekay01@gmail.com , / E-mail/Fax : nia.340200@newindia.co.in /
PAN No : AABCC3459K S.Tax Regn. No
GSTIN
:
:
AAACN4165CST178
09AAACN4165C4ZM GSTIN/UIN : 37AABCC3459K1ZG / NA
SAC : 997139 (Other non-life insurance services excl RI)
Policy_Details
Business Source Code Policy Number : 34020047182300000001
Period of Insurance : From:29/11/2018 10:47:59 AM To: 28/11/2019 11:59:59 PM
Dev.Off.
level/Broker/Corp. Agent
: A.K. SHARMA - (DE9771686)
Date of Proposal : 29-Nov-18 Agent/Bancassurance Mr. ASHOK KUMAR RATHOR (NIAAG00061890) ASHOK KUMAR RATHOR (S100101350)
Prey. Policy no. • . Phone No : 9411913038 / NA
Client Type : Non-Corporate E-rnaiUFax : rathor7041@gmail.com , / / /
Premium GST Total(RS) Receipt No. & Date
11400 0 11400 34020081180000006119 - 29/11/18
POLICY SCHEDULE
Details of Group Unnamed
Sr. No. Number of insured persons
Geographic al area
Description of
persons covered
Age Group SI per person Assignment details Name of
Owner/Benefi
ciary
1 200 NA NA NA 100000 NA NA
Special Conditions:
NA
Subject to Janata Personal Accident Insurance Policy Clause as attached hereto.
NOTE: WARRANTED THAT IN CASE OF DISHONOUR OF THE PREMIUM CHEQUE, THIS DOCUMENT STANDS AUTOMATICALLY CANCELLED 'AB-INITIO'.
Premium and GST Details
Premium
SGST
CGST
IGST
Rate of Tax Amount In INR
711400
0 0
0 0
0 0
In witness whereof the undersigned being duly authorised by the Insurers and on behalf of the Insurers has (have) hereunder set his (their) hand(s) on this 29th day of November,2018.
For and on behalf of
The New India Assurance Company Limited
Signature Not Verified_
DigiT Tly sig by Sriniva n Policy No. : 34020047182300000001 Document generated by 22286 at 29111/2018 11:04:45 Hours. Vaide an Regd. & Head Office: New India Assurance Bldg., 87 M.G. Road, Fort, Mumbai - 400 001. TOLL FREE No. 1 800 209 1415. Date: 201 11.29
For tad)itfi.1.1641 your grievance, if any.you may approach any one of the following offices- 1. Policy issuing office 2. Regional office 3. Head office.ln case, you are not satisfied with
our own grievance redressal mechanism; you may also approach Insurance Ombudsman. For details of our office addresses and addresses of office of Insurance Ombudsman, please
visit our website http://newindia.co.in .
Page 1 of 2
THE NEW INDIA ASSURANCE CO. LTD. (Government of India Undertaking)
Date of Issue: 29/11/2018
Duly Constituted Attorney(s)
Mudrank Dt. consolidated Stamp Fees Paid by Pay Order Number vide receipt
number dt.
Stamp Duty under the Policy is Z1/-.
Tax Invoice No :
IRDA Registration Number: 190
Policy No. : 34020047182300000001 Document generated by 22286 at 29/11/2018 11:04:45 Hours.
Regd. & Head Office: New India Assurance Bldg., 87 M.G. Road, Fort, Mumbai - 400 001. TOLL FREE No. 1 800 209 1415.
For redressal of your grievance, if any.you may approach any one of the following offices- 1. Policy issuing office 2. Regional office 3. Head office.ln case, you are not satisfied with
our own grievance redressal mechanism; you may also approach Insurance Ombudsman. For details of our office addresses and addresses of office of Insurance Ombudsman, please
visit our website http://newindia.co.in .
Page 2 of 2
. ':
;_-,_ .. :i:. . . . ·:., .. ,!' :
:· .. ',, . •• , ,1 •• • y \•
· .. 7 ;. ·
. . ,. · ....
' ' ... ,) . .
\ . . \ ·
. \ " . セM
セ M[A QセM ᆳ
/ · セ N@ .
::·,
I . · . . i ...
/ '
· .. ·: ' I ,.· .. - -- .
: . Mセ@
: .
' : .
· ... ... ,f,_ ...
·\
/
ᄋ セ@ ....
: !··
; .
·',
. '. :, セ@
;.' .'."'•
, ...... .
1.·.:
· '
.,. I
! ••
" MセN@
i I . J
. _,_.
.. ; . . : . . . ... ··.: ':' . . セ Z@ . . : · · . . セᄋ@ . ' . ' . ... ..
' .
.....
. •" ... セ ᄋᄋM BN M .· ..
.. ... ... • I • ,
.. ··
• J
i
. ᄋᄋ セ@'j
.. _;
ᄋセ@ i
'' ·.•
'i ,·I
, .. セ@
. ;
. . .. . _ :. L ... ·. ᄋ MMセM M N セ Zセ M セZェセセセセセセセセゥaエN[Nセセ\セj@
Z[セセᄋNZᄋNセᄋ Z ᄋ セZセᄋ@ .. セZZᄋᄋMセ@ .. I [ᄋ[LセWセ@ Z ᄋセ@ ... Mセ@ ... ᄋセMセM ....... セセセBWBGBᄋ ᄋᄋ@ .. ZZMZGᄋセセセ ZセN⦅M .. ":'.'": ...... GᄋセセZ ᄋ セセ@ .. ZセᄋZZᄋM セ ᄋセᄋ セNLセ MZ GZGセ GBZZエZᄋLZᄋセᄋᄋZ セ ᄋ MセᄋBZ@ ····· ᄋᄋセ@ \ ... ᄋセ@ . \' '; •' ... . NLNセ@ ·.· .. · : . . :·. . . \ ; ; .. . .. セ@ . . ..
[L N [LLセセヲNN@ .. ᄋ[L [LZ[ LNN [NᄋセNNN[N[ᄋ N セセセ M NNN」NNNN[NNN@ _;· ........ ,_,,._.,, •. ,., •.• ,.,,...;.•, ,:,·,,.· .• Nセ@ .•.•. ·.·-· .••• .: .• [[Nセ@ ..•. • . · · •...•• : .•• · •• :.' .. : ........... .,: .. .... ...... :.·: •• : l. , ..... : -·· ......... セ@ ................ ! . .................. セMMセᄋMᄋᄋMM ............. ·,; . • ,. ··-·· ·
,:,. ..
. '. セM .
.... ! .
. .
CONCESSION AGREEMENT . . .
FORS·E.TTING ·UP
. "
·.·
. .......
. .
. ;., .}
MUNICIPAL SOLID WASTE (MS.W) ·TO ENERGY .. Zセ ᄋ AGZA@·PROCESSING FACILITY · _,_J}' ·
NcG| セ I@\l 0'·} . t5 セᄋセNᄋ@'-,_/, (;> ;:·. .
,,.: ;• .
IN GUNTUR, ANDHRA PRADESH ..... セ@
\ i
\ \
r' ... --·
4'.:( ())
I.
l セNN N NNNNNN@ .
... NNNカNヲエゥ|HセNMMM ᄋMᄋᄋ@ .. ···""' ·-1-,,. ........ f. .,J.. ... ; ..... . • ••• • · •• •
. .
NセN@
- -----------·---- ----·-··--· M セ@ MMᄋMᄋ ᄋ MMM M MM MMMセ@ ----·
. ·'·
•
iᄋセ ⦅ZN セ N@ . ·. r : NᄋセセNN NN@ . · -..,.--_: -.. MZMᄋセ@ .. . セᄋᄋᄋM .. MᄋM セᄋ ᄋ ZMNM[ZMW ᄋ セ@ .. , ....
セセMセセセ M L[NNセL@ ... . ... · ... , .: .. :....... · .. セ@ •. ., .... , ........... セN ᄋM」 Nセ@ .. . [L[N ^ セMᄋᄋB ᄋNMN MMMᄋMᄋᄋᄋᄋᄋセᄋBᄋセ@ ................. .
.. ·: ·.·. . .
:• ... . -. セM . ':' ' ·: \ . . ' -'\ ., . . . Mセ@ Gセ@ .. . G QpZエヲャZQkセN
QセセセヲゥヲPZ A@
. ''"' ,.,
'
セG@ :
t. · ..
セᄋᄋ@\ Mセ N@
'· \ セゥ@
Contents
PART I- PRELIMINARY ........................ : ............................................ : ................................... セNL@ .......................................... : .. セN L N Z NL Z@ .. i 0 . . . ·.. . . . .. ' . .· . ·. . . . · . . ::!•. ::, . .. .. ·-· -.:.
1. Definitions and Interpretation ............... : ... : ................... :: ..... : ... ,: ..................... : .............................................................. セNZ [Z@ .. -.. :.:;-}4. : . . , •. , · · -·· , ., .... , •..•••. '" . . ', .. • . ...... . .. . .. ........ . -.•. . . ... :- · • . .. . . . . ·. ·· . .. .. .•. .. ·····: . • . ... . ... -. . •·---: -_ .......... _ ... . , t- . ;
1.1 Definitions ............................... , ........................................... : ........................................................................................ :.: ......... : 14 ;
· 1.2 Interpre.tation ... : ................ セセ@ ... -.............. : .... セZ@ .. :.:: ........ :.: ..... ZNZ セ ZZZZZ@ ..... :.: ...... : ............. : .. :::.:.::: ... : ... ::.::::: ...... :: .... ::.:::: .. ZZセZ N Z NZ [セ N セZ ᄋ Z [ ᄋ NR_ N ZZ@ ·· 1.3 Measurements and arithmetic conventions .............. : ........................................... ; ........................................ .' ..... :: ... 30 :
.. ·. . ... ·: . ....... · .. : .. ... . ·: .. ' · ... : .. ·: . . ...... ᄋᄋMセ N@ •,, . . . :: ,•. . ·.· .. ᄋ セᄋ@ ·. ' . .. . . .. ... ·. ..': .. ': .. :.:: ᄋ ZᄋNZセZᄋ Z セGZZ ᄋZ@
1.4 Priority of agreements, clauses and $chedules ......................................... : ............................................... : .. ; .. セNZ@ ...... 30 ·
·J-;ART II· THE CONCESSION ..... セ@ ...................... .-................... , ......................................................................................... , ......... _:.:..·:· .. ; ... 32: . .':
. · ... . .
2.1 Scope of the Project ................................................................................................................................................. ;.:,, ...... :_33 .. ·
2.2 Processing Technology ........................................................................................................................................... :;;: .. _. :····33
3. Grant of Concession ............ : ...................................................................................... ; ................................................................... ,: 35
3.1 The Concession ............... : ........................................................................................................................................... : .. .,. . NL [ NセSNsN@ · .. ·
ᄋL IILセセセ@. .. , Bエ ᄋ セ M セ@
. ZM Lセ セ M セ[エ@L Z L ᄋN セ N@
.. ..... セN\A Iセ@
. Z ᄋZ Zᄋ Zセ@
·. , . .... . .
&l:; -;:: L;) セ セ@
. 4·, Conditions Preceden.ts ......................................................................................................... : ................................................ :· ... : .. ZNNLセセSW@ z: t.> : . . ,., ' . . . . . . セセ@
4.1 Conditions Precedent ................................................................................................................................................. : ......... 37 ᄋ セ@
. 4.2 Damages N ヲッセ@ delay by the Concessionaire .............. : ............................................ .' ................................................. , .... 3 t·:\ セセ M :":f . . . . . . . •t ·. ··o ᄋセD B@
. 4.3 Damages for delay by the Lead ULB .............................................................................................................................. 38· セᄋセ@ .. : t) 1:.\: . . . . ᄋ セ@
5. Obligations.ofthe Concessionajre .......................................... セ@ ...... セ@ ............................................................................................ 39 .· · M セGゥェNN@
. セセᄋ@5.1 Obligations of エセ・@ Concessionaire ................................................ .' .................... , .............................................. : ... セ@ .. : ..... ,. 39 :J . . • <J; . :
5.2 Obligations relating to Project Agreements .............................................................................. : .................... :: ......... 40 . jNDNセ@ L セ@. . . N、ᄋセcU@ !;:::'
·5.3· Environmental Compliance ........................................................................................................................................ : ... ,.4J; . セ|Z セ@ セ@
· . |NNLセZ ᄋN@ c .. セセt@ i ·
· ::: セZZZ・セZゥZᄋセᄋセ[[セセᄋセZZZZZZZZZZZZZZZZZZZZZZ Z ZZZZZZZZZZZZ Z ZZZZZZZZZZZZZZZZZZ ZZ セ ZZ ZZZZZZZZZZZZZZZZZZZZZ ZZ ZZZZ ZZ ZZZZZZZZZZZZZZZZ ZZZZ ZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZ N ZZZZZZZZ Z ZZZ@ : .. .. NL[Zセ@ 1? .5.6 Post Closure Activities .............................................................................................................................................. _ ............ 4·l . セ M ·f
. . . . . . ·. . ............. セ[ セ@ ᄋセ@ . ,.. . 5.7 Measurement of MSW ...................................................................................................................... ; ................................... 4\ ·;_·; .. Z[[セ@ セ@
L .· セセセセ@l 5.8 Maintenance of records and Operations Plan ........................................................................................................... Tセ セNNNM E g..
. .· . . ·· ·· ._:.§ 0
5.9 Sale 1 Distribution of Compost 1 f11anure I Energy .............................................................................................. セ@ .. TRONセ ィ BMZG@ セ@: . . . .. . . ; .. • 51
5.10 Penalty for O&M Breach ........................ : .............. : ......................... .-...................................................... : ........................ セT R@ · ,.....
. セ@
. セ@
5.11. Obligations relating.to Change· in Ownership ........................................................................................... :.: .......... Tセ セWIGZ@ . 5.12 Employment of foreign nationals ....................................................................................................... : .. : .................. 44>·:--· ·
..... _ . ...... . ....... .. ........ LNLNセ ᄋ@ ... セセZA GAセG G@ セ@ ....... ' :-.)1·'· ' .... ""'..,·, " .. [LZLN N セ@ GjGᄋᄋ セMZ@ .... •·· .. ·..tt •1 •
. ,. ··. :•. ':. ::· : .... .""{.".' ....... ' ' ...... ,'
.,.:::.:..:_ .. _, ........... ᄋセᄋ@. f ᄋMセᄋセNN@ ᄋᄋセᄋᄋ ᄋ ᄋG@ • •••• ,.." ..... ·--···' セ@ '-;.•:. '• ;.:.v, • ,:;... ••••• .;.. ....................... .... - : •• •• • • -·.
. .. - '· .... .. ...... セNMN@ ..... :...;.,,..: ,_ ᄋᄋ セᄋ@ ... : ... · ...... :_.. -.. .... ..... .. . ··- ···-·' . .. .. -
I-I i i I
セ@. 1.\
.. , i \
··\ ..
/
i ... \ セ@ .... )-
; ... •.-. .. .. :. ... ' ... ..... ··-
6.2 General Obligations of the p。セエゥ」ゥー。エゥョァulbウ@ ....................................................................................... : ......... : ..... .-.46
セNS N jGイ。 ョ ウーッセ。エ ゥ ッョ@ of MSyj Hrセオエ ゥ ョァI@ .......... : ............... , .... : .......... : ..... : ....... , ............. .' ................................................. , ........ :4 7 :
7 セ@ r・ー イ ・セ ・ョ セ エゥッ セウ@ セョ、 N@ w。セセセョエセ・セ@ ... :.:-.-.. ᄋ NZセ@ ............ : .. : ........ : .... : ..... · .. : ........ セPN ᄋ N Z NZ@ ......................... · ........................ セ@ .......... ,:.:., ..... · .... : ... : 4-8 :.
7.1 Represe.:.t<itibns.aiid w。イイセョエゥ Z ・セ Z ッ ヲcッゥゥ」・ウウゥッョ。ゥイ・@ ...... : ....... ::; ... : ........ セ@ ... :.: ...... .-.: .... : ............ ;; .. : ... : ... .... ,· .. :.' ... : .. :.:·':48.·
7.2 J:{epresentations and キ。イ イ 。ョセゥ・セ@ qf the Pat:ticipating ULBs : ...... : ......... : ................................ : ......... : ..... : .. : ......... Uセ@
7.3 Obligation to Notify Change ................................................................................................................................ .' ..... , ...... SO
8. Disclaimer ............................................................................................................................................................... , ................. : .......... 51 . .
· ·s:I tiischiimer: ....... : ................. : ...... : .. : ...... セ@ ... :.: ............. : ... ......... .-: ... : ........... :.:·: ... :: ........................................... ; ............... ;;.-.. ; ........... Sl
,.j
0 .. <:{ .. o·
H.l .:.
:··
. . .
PART III · DEVELOPMENT AND OPERATIONS ........................................ : ............................................................... : ....... :.' .... 52 ::: セセ@(.) ᄋ セᄋ@ .. ii} 6 '
. ·, . (/j ᄋセセ@
9. Performance Securlty ......................................................... , ....................... ...................................................................... , .......... 53 ·.......;.,.;;; N セセZ@
. . 3 ' セゥN_エZケ ヲ@9.1 Performance Security for Construction Works ........................................................................................................ 5 0 ··5:
. . オセ@
9.2 セーーイッーセゥセエゥッョ@ of cッセウエイオ」エゥッョ@ Performance Security for cッョウエイセ」エゥッョ@ Works .............................. : ......... 53 ( ') セ ス@
9.3 Release of Construction Performance Security ................................................................................................... · ..... 54 \'1 ,; ;! 9:4 Performance Security for Operation and Maintenance Period ...................... , .................................................. 54
9.5 Appropriation. of Operation Performance Security during Operation and Maintenance Period ........ 55 (;
10. Project Site ................................. _:_. .................. セ@ ................................ _ ..................................................................................... : ......... : .... S6 : · セ ゥ@ £. 10.1 VestJng of Site with Concessionaire ................................................................................................ ................ ,.: ........ 56 · N セjMM セ@ セ ス@
,··· . . . : . . . . . . サセ セセP@ z. 10.2 Rights, Title and Use of the Site ........................................... .......................................................................................... UV Zセ@ "12 セ@
. GGᄋGQG ᄋ セ ッェ M .: 10.3 Possession of the Site ........................................................................... セ@ .......................................... .' ................... : ............ 57 ;;:t.. セ Z@ !J:
1
. . Pセ@10.4Applicable Permits ............................................................................................. : .............................................................. 58 2.
. . .. ('
10.5 Protection of Site from encroachments .................................................................................................................... 58 J セセ@10.6 Access to the Participating ULBs and Independent Engineer .................................................................. : ...... 58 ...... jセ@ J1
. . セ@ r, , 1v; セ@ 1 10.7 ? eological and archaeological finds ........................................................................................................................... UX ᄋ セセ|セセA⦅セN セ@ セNZ@
11. u ·1· .. · · A · · d d · 60 ( .. ..;:;,'lls セL@. tJ. Jttes, ssoctate Roa sand Trees..................................................................................................................................... . ·•· . ...;, t:> J . . . . ..... ·:( e
11.1 Existing utilities and roads ........................................................... ; ................................................................................ 60 ( \ ..;:
11.2 Shifting of obstructing utilities .................................................................................................................................. : .. 60
11.3 New utilities and roads .................................................................................................................................................... 60 # \
•'
11.4 Felling of trees ................................... : .................................................................................................................... セ@ ........ 60: QNNN Zセス@
12. Development and operations of the Project ........................................................................................................... ,. jM NセBBエZセセ@. NャセGAss ヲc@ セr@
12.1 Obligations prior to commencement of constructio'n ........... ........................................................ MIIN.M gjjjャHセAjA n A cゥpi i uty@セ@
12.2 Project Implementation: Construction of Project F11cilities ................................................................. ............ 6l . セM _
12.3 Project iセーャ・ュ・ョエ。エゥッョZ@ oー・イ。セゥッョ@ and Maintenance ....................................................................................... 62 .:; 1. セセZI@I . ,: _.,
13 mQRNセ@ dQセ。キゥョヲァcウ@ ......... , ................................................................................................................................................................... ZᄋᄋV
Vセ HIセOセヲ@ セZNMZ@
. orutonng o onstructton ....................................................................................................................... : .......................... ,,.,:.. セZZ セ@ . , . . :: .. • • セZ@ ' l1• • "
. 13.1 Monthly progress reports ....................................................................................................................... ..................... Z ZL Vセ ZセセZ@
||MM。Nッ 。 ァ・OII Y セ@ セ@ C ';' ' . ¥.} . / : ..... ·. セャ「@ '/.: ;." .:Q .. i @ |NセI@ , . .
G セZ@ ;: : ᄋᄋZN wjAャ ᄋ ᄋᄋ ᄋ セ \エ@ ;;. セ セ@ . , : . f Z セ@ .. . ᄋ L ^LNセ ゥ ャセ@ セ@ , .. --·· 」 Gs イLLセOエイVヲNH スZセ Z N [@ セ@ .. i.
:, .· '·.:.:.'':·.:.:,.:•!' · QQA|ャIAャLNaエOalurG [セ A[NNNM >./·• ·., . . .,, · · '· ·' L セᄋ\ᄋG ZᄋMZ[@ . . ;j}.i セ@ セ |GZャイ@ f\1\J"'\ 1.r-"'""-'! > ... w\\•''·'•< • ..... • ...
'Qe ..... |セ@ ' ! " . ··:-.;::.:.;#
------ Mセ [セG@ t Hセ@ セ セ@GNゥgオセセ@
セ セMMMMM MM MM ッ・MMMM MM M MMMᄋMMMM , ____ .....,... __ -··-·--
· -:: . . . ... · . . . .. : .
. ·::· . .
13.2 ャョウー・」エゥセョ@ ................ .' ..... : ...... : ................................................................... : .. ." ..... セN Z@ .. :.: .. : .. : ............................... : ....... .-.::: .. セ[ M セ ZN セ N@ H[セ G@ . . ,,,. .. , .. · .. ;
13.3 Tests ...... : ..... : .... ; ... ; ........ : .... :.: ................ : .............................. : ...... : .......................... : ............. : ..................................... セZN Z ZNZZZ ᄋZ@ .. :.66;.· -.· ... · · · .:·r·-'·>: ·: ... 'J.t .-: .. ·::
• •• • • • • 0 • '; • • ' • ' • • • • • • • • ' •• ... ' : • ... ' 0. • • • • • . ••• , • • • • •• • • ' . • • • -' . ·' :· • .. •• MセNZ@ • • :;·, .. : : _.; : • • :·:· : . \. > .;_. ... ᄋ セ ᄋ@ ' . 13.4 Delays dur1ng constructlon ............................................ : ...... , ... : ..................................................... : ........ : .... ,::.·.:·::·:.:: .. セ@ .. 66:. · _·
13.5 Suspension セヲ@ unsafe Construction-Works : .. ZセL@ ........ : ......... _ .................... セ@ ......... :·······: .. ·•· ... : ........... , ......... Zᄋᄋ O Zᄋセ[ᄋセᄋ ᄋ Z VW L@ᄋ M QセNV M カゥ、セ ᄋ ッ ᄋ イセエセセセゥセァ@ ...... : ........... : .... : ..... :.:.-......... セ@ .. :.: ... : .... • ... :: .......... :.: ...... :: .... :: .... -............. : .. ·.:::.: ... : ... : .. :.:.·:.:::.':.:: ... NM N セZ N Z N Z[セ[Zセ@ ... コZ Z Zセイ@ -:;::.
14. Com pletiori Certificate:.::;:: ................ :.:: .... : .... : .............. :.: ..... : ..... :;;: ... : ........ :: .... : ... : ... : ... :.: .. :.: ....... : ....... : ... :: ... ::: .. ::.;:: .... ::·:,::::.:;.::i6R" MセNZ@ ·• ••
セZZセ@ [Zュセᄋ[ZセZセ G セZセ[NZ[セZN Z@ :::::.::::::::::::::::··: ZZ Z Z Z ZセZZZZZZZ@ .. :·:.::: ::::::::: •• ::::::::::::::·::::::: ::·::·: ::::::::::::::; J.t)'2.:k!! . · ,_,. • .. ·• · ' . ᄋᄋᄋM ᄋ ᄋᄋM ᄋ セ@ •"""'' ' : ' . . ., .. ' . -·· • .. ., ··. ' 40···. . . •. . ... ·•··. ·.•. ᄋ セ@ . .• , , ·.
14.3 Provisional Certificate ....................................................................... _ ................................................... : ........... ::.: .. ; .. :_.: .. :·.:._6$.' · · · ·: •;-,./:·.
セZZ[@ セゥセセセセZセZァッZ[[LZセウセZZセZセZZセZ[ZZZᄋZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZᄋZZZZZZZZZZZZZZZZZZZZZZZ ᄋ ZZZᄋ@ .. :::::::::::::::::::: ::: ···:: ··. セ ᄋ@ セ ZZ@エ セ@ I·, .J
. . . A セ_@ セAセ@ .: ·:· 14.6 Resche_ duling oiTests .......................................................................................................................................... .-.. ,: .. L Zᄋᄋᄋ ᄋ N Vセ N@ (/' .. ..,
. .. . . . .. . . . . . . . .., . ·•.·· . . ,Ji$ 15. Entry into ⦅ 」ッュョゥ・イセゥ。ャ@ Service .................. セ@ ...................... : ................. : ............................ : ............................................. Z NZセ ZᄋOᄋZ NZNMS_ ᄋ N@ ᄋ NZセ@ セセZ@
15.1 Commercial Operation Date (COD) ................................................................................................................ :.: ......... 7.1 -: 6 Z[Zセ@.. · · . ·· . . ' . . . . . .. : .. . ·: : .•.. (.)CI.
16. Operation and Maintenance ... : ................................ _ ............................................................................................... _. ..... : ........... _:7?<":··\ . セ S@ .. :.· : : . . . . . .. '; . . . . . · .. ·· · .. ·. "·· . セ@
16.1 Operation &·Maintenance Requirements ............... セ@ .. .. ..................................... : ......................................... ,.: .......... 72 ': ... ) !: '·
16.2 Operation & Maintenance. Manual ................... : ......................... : ............................ .' ....................................... :.:· ... : .... >/2. .
16.3 Damages for breach of operation & maintenance obligations ......................................... : ............ : ....... :: .. : ..... 72 . セ セ Mᆳ
セZA@ . .. J :·
· . 16.4 Lead ULB'sright to セォ・@ remedial measures ............... : ....... : .............................................................. : ... : .. ·:··: ... セ@ ... :. 73. ᄋM セL@ セ M セ M Zセ@. . . . . . . . .... ;:: (_ , ..
· ·· •16.5 oカ・イイゥ、ゥョセ@ powers of the Lead ULB ............................................................................................ ; ................... :····:;, ... 7.3 ;; ZNLN セ セ|G セ@ セセZ@ セセ@. . . . . . . . . ·. ' ;,. '41i'/'!: _,. '
17. Effect ()fVariations in MSW Q4antity& Quality ................................................................................................... :: ..... :; ..... 74\ _ ZLエセM t; _?.: ' . . . . . . . . '. ·. ;;,;;: .. t' 0:. '
·17.1 Effect of variations in MSW quantity .... .................................... : ................................ : ................................... :.; ..... , ... 74 . ... 8 セセ@ -, . . . . . · .. · . · z
17.2 MSW Maximum Quantity .................................................................................. : .......................................... : ..... [NZセᄋ Z@ .. ::·:. 7 4: ·'it _s: . 17.3 MSW_ Minimum Quantity ........................................................... .-........................................................... : ............. : .... :· .. セ@ .. 74 q. M セ M
. . . . . . . . ll'; :S[ 17.4 Revenue shanng by the Concessionaire ..................................................................................................... : ............ ;7 6 ---·.. j5 §
. . . . . / ,, : セ@ -... セ@
17.5 Settlement セヲ@ セッZョーN・ョウ。エゥッョ@ and. Revenue Sharing between the Lead ULB and Concessionaire ..... セz ᄋセ M セ@ t . 17.6 Effect of vanattons 1n MSW Quahty ............................................................................................................................ 78. ·. LL セ@ &:: . . . . . . セiG@ L'> . . . . .... \ . b,;. .
18. Safety Requirements ............................................................................................................................................................. : .... 79 . . · 1 セ M
18.1 Safety Requirements ...................................................................................................................................................... WYL Mセ MNB@ _, .... . . . . · . . . ( セ ZNNセ Z セ[セセ@
18.2 Expenditure on Safety Requirements ..................................................................................................................... セャエjNエ Q Gセ N ZLセZZ[ョエ L [er@. . . ' . C.\ .. il• ャ [[ィ N[NNL セ vᄋ|@ I.
19M . .. fO . dM' IH Q\G1"'llll"i(' i'? l-' . onttonng o peratton an atntenance ................................................................................................................. "',.. ,,_f',l BᄋカセZ Z Z N Zᄋ ャBG@. . / [セ@
19.1 Monthly status reports .................................... -; ............................................................................................................... XP Nセ@ ,:_iJ?· :··
., .... , ... _ .. ,
. I
! I I I'
·-:\ .' セ@
•r... セLᄋ N@ -: v セ@ ·· t • • •• ••• , • .... •-· '".: :• , ..... "''r:,""···!;.-.v .... _ : '•; .• "'::·: ._.
Z Z セセZ@ .. _ ... セMMMM セMMM Mᄋ@ ... -·. セMM セMᄋMᄋᄋB@ . ᄋMセ]ZᄋGNᄋセセZNMセNᄋZセNセセセセ N セ@ ... -.. ·· ···.·\ ··.· ... ... . .. セG@ .... "'. . _... . '- セMᄋᄋN@• < -"; t,
- .... ,; .. . . . . . . セ@ ........... LセNNNNNN@ ''-• ... :.. .... ----.- ........ ; .. ;.;, ....... , __ .. .. Mセ MMNM : ... :., .... Mセ@ ,.,., .. - ......... セMMMM ..
ᄋNZ GG Z セ@. セ|@
-• .o<$:,.:;;....1,:;11.&.11
. . , .....
2Cl. iョ、・ー・ョセ・ョエ@ Engineer ··:···: .... , ... :···· .. セ@ ................. セ@ ....................... : ..... ::··: ....... : ... : .. : ..................................... : .. : ....... .' ........... : ...... : ......... qMコ ᄋ ᄋ NZセ@
• · .. . セPNセ@ セイ Y N 」 N セセスNャヲNセ@ for セppセャA_セセセーエ L@ & Scope セヲ@ iョ _・セ・ョ、・ョエ@ Eng!neer ..................................................................... &2 . ... Mセ@ .. .. .. ... -. .. ' . ' .
· 20.2 Payments セ ッ@ iョ、セー・イゥ、・ョエ@ セョァゥョ・ ᄋ ・イ@ ... , .. : .. ;·:·: ............. : ... : .......... ;.: .... セ@ .. : ........... : .. ; ....................................... : ........ , .. : .. ,.-.82 .
· :Zo.3 セZ セiセ」セ ュセ _セッイ エィ ᄋ ・@ セ セセ・ー・ョ 、セョ ᄋ エ@ セョァ ゥ ョ ・セイ@ .......... : .. .'.: .. _.: .. : ...... :.:: .. : ............................. : ... : .... ;:: ................. _. .. :::., .. :.::·' 82 ·
RQNᄋセZZ[NZZZTセイAANNセQセセセZ[ZZコZZZ Z ZZZᄋᄋZZZZᄋZZZZ Z ZZZZZZZZZᄋZZZZZZZZ ZZ ZZZZZZZZZZZ ZZ ZZZZᄋZZZZZZZZZZZZZZZZZZZZZZZZZZNZZZZ@ :::::: ::::::::.:.:: ... ZZZ Z Z N セセ ᄋᄋL@ ..
セI N[N@ '
.. セ セセ ᄋ ᄋ[ᄋZ@
.- 21.1 Ownership durtng th.e Concession Period ....................................... , .......................................................................... 84 · .. ·· . .. .. :.. セNL N@ ·.: .. NMセ@ .. . ,,·., .. Lセ L セᄋセZNセ@ .• セ N MᄋMN L NZ@ .• , ··., .:: .... セ@ .. , ', •v···.········.-•:• セ ᄋᄋ ᄋ@ .. .,.., .. : .. .• . ·· ........... · .•. ,: セセᄋ@ ... ,·, ., •. · .. ZセNLᄋZZ@ .. セLNL@ ᄋ ᄋ ᄋMセG GGᄋ G BBG@ .. . · ' " ' • .. :·:. , . . ·· :
21.2 Concessionaires Obligations ................................................................................................ · .......... ,;.;, ... , .. " .... , ............. ,. XT セM
• . ...... !;
21.3 The Lead ULB's.obligatioris ............................................................................................................................... セ@ .. ......... 85··: . セ@. . . セセ@. . . . . . . . . l.li セA Z@
PART· IV- FINAN.CIA.L COVENANTS ....................................................................................................................... : .......... ... .. . , ... 86.:· セ NZZN@ ::2 22. Financial Close ... : .... : ............ .' ............... : ........................................................................................................................................... 87 :. セ@セ M. 22.1.Financial Close ........................................................................................ ; ........................................................................... 87 セMZj@ · .. · セ@ . .- ; . . . . . . . . . . . . . . . . . . : . . セN@ ゥイ ᄋᄋ セ N@ ;J .
22.2 Termmati.on due to failure to achieve Fmancial Close ....................................................................................... 87u • .. ·' r d:
23. iョ ウ オイ。ョセセ@ ......... : ........... · ...................... :· .... .'.: .... セ@ ........ : ...................... :' ......................... : ............. :.: ......................................................... セセ ᄋyNᄋZN@ i' :_) セセ@RSNセ@ ᄋ iョウオイ 。ョセ・@ .. , ......... : ........................ _,_ ................... .' ................ ,_,_,_,_ .. : ................ .......... : ........... _,_.' .......................................... : ........ 8.8 ..
NZN ZNセ@セ@ .. ;
>--23.2 Notice of the Lead ULB ................................. : .................... セ@ ............................... : ............................................................. 88 t: . . ·-· · ... '· . . . . ,' . ") N ᄋセ@ . 23.3 Ev1dence of Insurance Cover ....... .-....................................................................................................................... , ......... 88 \ :S セセ@ ·
. ·23.4 r・セ・、ケ@ for failure to insure .................... : .................................................................................................................... XX H_ZヲN セ@ セ@·.. . . . . . . . . . . ·.-- ZNキイ セ@ =, ZNZN セSNU@ Waiyer. セヲ@ sオセイセァ。エゥ N セョ@ ............. セ@ ...................... : ..................... :·· .. ·:·: .................................................. : ..................... :·:···: ..... B9 ·.· ZZZ セO ァ@セ ウN@
23.6 Concesstonaire s waiver .................................................................................................................................................. 89 o z · ... · ·. . . . . . f:l. z
23.7 Application of Insurance Proceeds ............................................................................................................................. 8.9 1.:1 セᄋ@. . . ,A .. セ@
. 23.8 No Breach of Insurance Obligation ........................................... , .............................................................. ................... 89 :-'. '\ c£ Z セ@. Gセ@ \ JO 3 't• セ MMMセ@
24. Accounts and Audit ....................................................................................................................................................................... 90 \.( .. • J.l:8 セ@. . . LMセ e@セ@
24.i Audited accounts ............... : .......................................................................................................................... : ..................... 90 {< .ig セ@. . . . , .. G LNNNNN BMセ@ セ ᄋ@
24.2 Appointment of auditors ......................... : ...................................................................................................................... 90 ·· ·11 セ@
. Z4.3 Certification of セ A 。 ゥュウ@ by Statutory Auditors . .' ......................... ., ............... ............................................................. 91'
24.4 s・エセッヲヲ@ ................................................................................................................. .' ........ : ........................................................... 91.
PART V- FORCE MAJEURE AND TERMINATION ........................................................................................................... セ@ .... Yセ ZZ L ZZセ@ セ@
25 F M. M セM M MB@ Mセ@. orce ajeure............................................................................................................................................................................... .. . . セセ QP LA@ •• , ..... セ セ@ :\':Cn
· RセNQ@ Force Majeure ....................................................................................... ;_ ....................... .................................................. セNm|G@ .AGIRI セ QZjni cAp N@
25.2 Non .. Political Event ..................................................................................................................................... ............... ........ 93 · ·}
·25.3 Indi'rect Political Event ................... _,_ ......................................................................... _,_ .................................................... 93 ' 1
25.4 Political Event ...................................................................................................................................................................... 94·
セ M G@
..... セ M .. ᄋ ᄋᄋᄋ セMᄋ@ ...... ,, ' . • ... ..., .... __ L N セ ᄋᄋ@ . . J., ..... '" ......... . .
-
ZZセ セ@ セᄋL LN セMイ ⦅N@
L Zj ⦅セ@ ... : i I
·.i
.t ·-· •.•• • '• •• .. セ@ ....
.... ..... . .. . ᄋセᄋBZ@ _· ... セセ@ ...... __ : .. ... .. ·.: ..... ' • . ._, ._...-. ;... .... G^ᄋZゥN ZNNLN[N NLZNNu ZN ZNNNNNNMNセZoZZNNjセセN [ セZ セ MᄋM[ZNL [NN@ .... _. セ@ ... ^セ N セ セセ@
25.7 Allocation of costs arising out of Force Majeure ..................................................................... , ................... , .. : ...... 9 6 • • •• • • • • • • \ • .: 0
25.8 t・イュゥョ。エゥセョ@ Notice for Force Majeure E\fent ......... ; ....................................................... : ..................... Zセᄋ [ ᄋ[@ ........... $7.
25.9 Termination p。ケュセョエ@ for Force Majeure Event .................................................................................. ;/.:: .•. ::,= ..... 9·7. ;
25 10 D' t o 1 t. · · · --· ..... "98··· . • l!?PU. e Lセセウッ@ :U ,10n ............................................................................................. : ........................................... ::"''".'"":" .. .
25.11 Excuse from Performance of Obligations ........................................................ : ........ : ................... :.: .... Z ᄋ ZZZ[ ZᄋG セ ᄋZᄋ Z@ .... :98
26. Com'pensa.tion ヲッセ@ Breach oi aゥゥ・・セ・セエNG@ ............... : ..... ,. ..................................................................... , ................. :· ... : .. ... .-... ::99 .
26.1 Compensation for default by the Concessionajre ................................................................................ · .......... : .... ' .. 99 . . -· - .
26.2 Extension of Concession Period ....................................................................................................................... : ... :.; ..... 99
26.3 Compensation. to be in addition ............................................................................................................ :.:":_ ... ZZ Z N Z セ@ ... Z Zセ ᄋ ZZ M ?9_. .· _ ·
26.4 Mitigation of costs 。ョ」ゥG、セセ。ァ・@ ...... : ................................. .' .... .' ........................................... : .............................. : ... : .. .' ... Yセ^@ .·.
. ·::
:. );
t· セ セ@o::.:n.,.
I.•J :. i z H[セ@
: () .. セ セ@. V' ᄋᄋ セ サ@
' セエI@ ᄋ セ ᄋセᄋ@
27 S . f c . . ' . . h . . 9<> ........._ ;- "': . uspenston o oncess1ona1re s Rtg ts .............................................................................................................................. ,.:. . セセ Zj@ .. . . . セ ᄋ@ l
27.1 Suspension upon Concessionaire Event of Default.. ................................................................................... :.: ...... Yセセ [ᄋ ᄋᄋ L N@ 9 セセ@• ·. 't'•'l \ (.)f..t ..
• . . . . , ·'· 1:.! I . 27.2 Lead ULB to act on behalf ofConcessionaire ........................................................................................................ 100· ... " .> I:) · .
27.3 Revocation of Suspension ........................................ : .................................................................................................. 100 . ᄋセ ^@セ M
27.4 Substitution ofConcessionaire ................................ : ................................................................................................. 10CI :>
27.5 Termination ............................................................................................................................................. : ........................ 10l. セ@ • • 0 • • •• \ セ@ Ci.
28. Events of Default and Termntat10n ................................................................................................................................... ... 102 ウ | セ@ 0
28.1 Events of De.fault ................... :···: ............................................................................................................................ .' .. : ..... ャoコ H WOfjNセャ@ セ@. . . セ ᄋ@ セ@
28.2 Termination due to Event of Default ..................................................................................................... : ................ 105 .&. o:: 0 • • 0 • ?
28.3 Rights of the PartiCipating ULBs on Termination .............................................................................................. 108 !;
28.4 Survival of. Rights of Parties . .' ........................................................ : ......................................................................... :: .. io8 9· 2 .;:·· . . .. / "5
29. Divestment of Rights and Interest .............................................................................................. , ........................................ 109 エ セ@ Mセ@. ' . N セB B@ GO セ@ .? .
29 o , '/ I '/0 :SO .1 Divestment Requtrements .......................................................................................................................................... 109 '1J·I) . 8': セ@
. セセ。@29.2 Inspection and cure ................. , ..................................................................................................................................... 110 /:"ll E g
, lセ o@ セ@. . . - . .,_, s: 29.3 Cooperation and assistance on transfer of Project.. ......................................................................................... 110 , .. .( e
. セ@ セ@
29.4 Vesting Certificate ... : ..................................................................................................................... .' ....... : ................ : ....... 110 J. セ@
29.5 Divestment costs etc ...................................................................................................................................................... QNセ L⦅@ .. . . t, ") ,.,. ..
30. Defects Liability after Termination ..................................................................................................................................... 1 セ LG@ ᄋ ᆬ セZ@. . . . . . . ' h N ゥセLQ A ssZ|ゥヲセヲNh@
30.1 L1abthty for defects after Termmatwn ................................................................................................................... l,:r ,,. QQ Lセ[@ ··m . セ NQmwa@ .Al-,,RI .;., .. !"'' J
PART VI· OTHER PROVISIONS .............................................................................................................................................. : .. 113 ·
' ,, セᄋ@ \'.''. • ,.:• :- r ·: ᄋ [Zセ@ ;' :"'- ..... セセZ⦅ZZ[ᄋL@ .. · · • セG@ ·, '• !• ᄋ[Zセ@ '' ., ... セᄋZ@ :;,;',, セ Z@ •:·: Mイᄋ ᄋᄋ Z ᄋ セMZM[ZGZ_ セ _[Zセセ ᄋ@ セᄋZMセ ᄋ M ᄋ ᄋMᄋZMセMMセMMセセZZN セセ セセ[@ • ;_:·.;·:,: .•• セ|LᄋZᄋᄋᄋ[B@ :; •• : < ''.'1 ... :. l > Qェセ@. ,_ ...... ... ...... : ............... :: Mセ ᄋ@ ᄋONZセ@ ;. :. . .. ᄋZZ[セセN@• •• •,,, , • • ••-· '" ,.,,, ...... ... .,_,_,.._. .. , セLZ@ .,, .,., o'.',, ... ᄋセ@ .. ., • .,:.;. . _ ; • .,. ,. ... , -.... LセN@ • •u •• ' '"' '' •" '""'•'
.• LᄋZNNNᄋ NL[ NLNLZセN@ Zセ@ •. :· ... l.:-.:_.·..:;.;. .... M セN セNNZ@ ............. :. .• MM N セセ@ • ..:. ィッセッ@ セNZN@ . ..; セ@ ... セセMMセ MMNセィ@ • . <: ...... ⦅[Nセゥ[@ .. ;. ·- ·.- -· ··-· -· ..... . :.:· .. NNNNN[セ N Mセ ᄋN Lᄋ@ • ..;·_ •. セ [LNNᄋ@ ..• . :.;..:· ............... : . •. ;
32. Change ゥセ@ Law ................. : ..................... : ...... : ................................................... :.: ..... :···· .. ······ ............................................ : .. :: .... :.:.116
32.1. iricfease in costs ............ ....... : .......... : ....................................... : .................... : ................................ : ...................... :.: ... ; ..... ll6' •. .. 't ':
3Z.2: r・N_セセ セョ@ in cos.ts.: ... : ............... ,: .. ·:·: ........ , ................................. セ@ ........ Zᄋセ@ .... _. .......... : .... , ............... : ........... : ... ; ..... ::,.,:::·: ... セ@ .. ·: 11:6
. : ·. 32.3 Z r・セエイゥ」エゥッョ@ <m cash COillpensation.;_,;: ... : ..... : ..... ;;;.; ........ :.; ... セ Z Z@ .... ;;;;;,;;;;,.; .. : ... ; .... :: ......... ;;;:;;; .. ;;; .. ; .. ; .. ; .. ;·;,;,:,.(:.;.: ... ;.; 1 J? ..
. セ ᄋS
ᄋ N@ l[|セゥセAセセ|QQ セエZエ ZZ ZZZZ ZZZZZ ᄋ ZZ ZZ [ Z ᄋZZZZZ Z [Z ᄋZ ZZZ@ :':: :.:::::::.:: •. :::.:::: :·::::· ::::: : ::··· ::.: :: ·::::.::: :::::::: :::: :::::• : ·";:\J:::i•lli: 33.2 iョ、セijャ N Aャゥエケ@ by _the cッョ」N・Nセ N セェY エ⦅ャ\[Aゥイ・ セA BB@ .. セ@ ... ,. .. _ .. : ..................... : .. ;.,.!,; ... , .. , .. ,_.,, .. _._ .............................. , .............. :, ... _ ...... ; .. ,;. 1]8 ..
33.3 nッエゥセ・@ and contest of claims ...................................................... セ@ ........ : ........................................... : ............... ZセZ@ ......... 119
•• GャッッNエNセLjNM @
. . ...
·. /'fJ, .,, GZ[エセ@
.. -.:.;'.
ᄋセセセ@.. セᄋM
"= [ゥヲ セML@NN セ セ M セA Zセ@2<.. , 92 . . (.;} ....
33.4 Defem:e of claims ................................... : ..................... ....... : ....... :·· .. :·::··_ ... : .. ᄋᄋ セZᄋ ᄋᄋᄋᄋセ Z@ ................. _. ....... ZZ ᄋᄋᄋセZᄋᄋ ZZZ ᄋ ZZᄋセ Z ᄋ@ .... ::·: .. セ@ 1 セセ M セR@ セN@
33:5 nセ@ セ[ョセセアオ・ョセゥ。ャ@ 」ャ[ゥュセ ᄋ@ .... セ Nᄋ N Z@ ............ セ N ZZ@ ............ .'.: ............... .' ....................................................... ,. ........................ _. ..... . 120 ᄋZLセ@ =j セ@. . . . . ('"··,, . d (
33.6 Survival on Termination ......... : .......................................................................................................................... : ......... l20.i. ,.,· .. 0 ッセ G@.. . . . . . . .· . ·.· ..... :. . }!!
34. Rights and Title over the Site ................................................................................................................................................. 121 Z N セ@
STMNエ ᄋ lセウウ・・イ N ゥ N ァィエウ@ .................................................................................................................................................. · ... : ...... : .... _ ..... . 121 Q N Zセ@ ·
34.2 aセ」・ウウ@ rights of the Participating ULBs and o.thers ....... : ................................................................... : ....... :.: .... l2_1 セ@ · . . . . . . \ <(
セTLNS@ pイセーセ M セ@ taxes .... _ ........... :_ .... Zセ ⦅@ ........... _.: ... : ........................................... : .............. : ............................................................ : .... Qセ ᄋ Q ᄋ@ ᄋ M[ZZ[ セ セ@ Q· · 34.4 R.est.nction on sub-lettrng ........ _. ................................................................................................................... _. .... : ......... ,. 1"' 1 NセZ@ t.\:7> ;-c. . . . . . . . . . . . . . N ZNZNNカ セ@ ·-}
35: Dispute Resolution .......................................................................................... · ..................................................................... : ..... 122 •,.,!J f: セZ@. . . =)· sa: 35.1 Dispute resolution .................. セ@ ..... , ..................................................................................................................... _. ...... : ..... _12:2 · l) ";;?
•• • • • • I'YI' ,., ... . :
35.2 Conciliation: .... セ@ ....................... : ........ : ................................................................................................................................. 1i2 t· :. セ ⦅ U L S@ j|イ「ゥセイ。エゥッョ@ .. : ....................... · ................................................................. セ@ ................................................................. ; ............ 1 i z,. ....... , ·1_1 ''.
·35.4 Enforcement of Award ....................................................................................... : ........................................... .-......... : .... 123·' j 1 4;g Mセ@'.·.. . . . . . セMMヲGQ ZZᄃ@
35.5 Performance during dispute ...................................................................................................................................... 123 セGャヲ ゥGゥ@ ·.; ·· . ·. . . . /fi.' f@ セ@
36. Disclosure ................................................................................................................. : ..................................................................... 12.4 ·)t'3 セ@
, ... t '" 37. Redressal of Public Grievances ................................................ : ............................................................................................. 125 . ]. セ M
· 3 7.1 Complaints. Register: .. ·.··: .......... : .. ; ... : .... _ ........... _ ......................................................................................... : ...................... ,i\2 UO セᄋ@ .. ::)
· 37.2 Redressal of complaints ......... .-...... : ............... : .......................................................................................................... : ... . NQセQRᄋ@ セ Lᄋ a Z ZNNNMセMᄋᄋ[@. .· . |ゥGNNMセ@ -
38 M. II ... . . . . . · · . セ セ ィ ᄋ[ エウセNZNj Aセ ャZ[ャ@· Jsce aneous ........................................... ; ........................................................................................................................... ma_セga@ .fGIBl t,\UiliGiP.'I
38.1 Interest and Right of Set Of£ ................................................................ .................................................. : .................... QセV@
38:2 gッカ・ セョゥ ョァ@ Law and Jurisdiction ........................................................ .' ............................ .' ....................... , ................. 126\ )
. 38.3 Waiver ............................................... : ..................................... .-........................................................................................... 126 ᄋH セN@ , セQ@ !,' .•
:::: セZZZNセセセセセZZZZNZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZNZZZNZNZ@ ::.::::::::::::: ::::::::::::: :: : :::::.: : ::::::::: : セ[ | ZセZセBGᄋN@:?
! . . i
. ........ ··-·
- ,"-.... '
··•· -·· I
•.
., ..... _ ..... ᄋセᄋMᄋᄋᄋMセ@ , .... , ___ : --. ----. -:-:-. - ---,-- .,-.,-...,.-.-,.-,..,.....---.,.,-..---" ... セ N@ MMZ セ BWB セ セセ NLNN M ·":::" .• "\'.-· M セ ZセセM セ ᄋML ᄋBBセセ G MZM [ZB N セ BBャゥG GMGZG ⦅L GABGAJBBBBセBBGI G セ NZ ZZゥBスセ@........ ;..-::.. ... . ; セ@
-- ··-- ___ ... . - ··-··- _ .............. -· セ[NBZN@ .• < ..... セ@ .. . -- - ,....; MNセNカMセMNセM ........... MGMMM M ᄋセ@ ... --• ....,._;;a.--:-":"uo.:."". . ... セセMLNN@ セ@
38.9 w。ゥカセイ@ of immunity ............................................................... : ........................ _. .................. , ............. : ..................... ZZ ᄋB ェ B Z N セ N セ ャZZ N セ N@ · · ·· .· :jj 38.10 Depreciation and lnterest.,. ................. : ....................... : .............................................................................. : ....... :: .... /129
38.11 dセャ。ケ・ N 、@ pay;rnents ........ .. : ............. : .................. , .............................. ... : ..... , ......................... , .................. .. : ............ : ... ,. ...... , .. ャN セ セMY@. . .. .. : ... <. . セ A@ ' . .... セM . ' ' . . . : .. . ' . . . セ@ . ·. ·!.7 '· . (:', ·::.: [セ Z M ᄋ@ '• .
. 38.12 eク」ャセセセッセ@ セヲ@ 1mphed キ。Nョ[。ョエQ・ セ@ etc ... ,.; ................................................................................................... ZZ[N セ@ ......... M QセNY@ .. _. ..
38.f3 Entire Agreem·ent ...................................................................................... : ...................... : .. _. .................. セ⦅N@ .... セ@ .. :;: .... ....... ii9..: ·. . ... . . . • . .. . . .. . . . ·. . : .. . :_, . ·. .. . . ' : . : •. ·::;·.i.:,·.··
· 38.14 Third Parties ............................................................................................. : .... ; ................................................. , .. .-: .. ᄋᄋᄋ セᄋ ᄋ@ .. NQLセY@
..... ^ セ@
M セ ャNBG@
. セ セ@
セ@ .. セ@ ` セ@· 38.15 Successors and Assigns ............... : ... : ....... : .... : .............................................. : ......................... _.; .................. :.::·;.-...... :; ..... セ セ ZQ ⦅ P@ (':; 9.::;
schZ[セ[ZZZセセセ]ᄋZᄋ Z [ZZZ ZZZZZZ@ .. ::::·::·::::::·:;··:: .. :::_::::::;::;:::··:::-::-::·::;:::::::::::.::::: .. ::::;:.:;.;:::: .. ::::· .. Z ZZZ ZZZZZZZZZZZZ ZZ ZZZ セZ セZZ@ : エエゥ ᄋ Z[ セ Zャ@. ·.·i ·I ·J o t.t:-:
1. Site of the Project ..... , ................................................................................................................................................ : .................... Qセ ᄋ Z TM ..•. / _Nセ[ NZ@セZエ Z@ -.: セ B@ . . 1.1 The Site ................... .... : .............................................................. : ........................................................................ ................... 134 ·
1.2 Sites for Waste to Energy pセッ」・ウウ ゥ ョァ@ Facilities in Andhra Pradesh ...................... ; ................................... ... 134 ·:r.
h • k.
1.3 Inventory oft e Site ..... : ........................................................................................................................................ : .......... QセZT N@ . . .. :• . . .: .·.' ,.;· セ [@
2. Applicable Permits ................ _. ....................................................................................................................................................... 12:51 セB ᄋᄋセセ@ S. . . ., A .se .
2.1 Applicable Permits ............................................................................................................................................................ 1:;5 --::- ᄋ セ@ : :
3. Performance Security for Construction Requirements .................................................................................................. 137 セイ セ@ セ@ · . . セ[@
4. Performance Security for Operation & Maintenance Requirements ....................................................................... 14·0 , .. . .. セ[ᄋ [@
. . :'!(
5. Project Completion Schedule .................................................................................................................................................... 14-3 [ セセ@. . . . . セ@
5.1 Project Completion Schedule .................................................................................. ........................................... : ....... : ... : QT Z セセ ᄋ@. ... |NNセセ jN セヲ@, . . . . L. セᄋᄋ[@ ᄋNᄋカNj セ@ ·.
6 D . 14 1:' \'' .-..,:-'f:; . raw1ngs ..... :..................................................................................................................................................................................... ·;, - ···,-'f.=: ·.· . . _,..,.{ ,;; ·.
: ZZZZAZZ[ZZセ セ] セ]NセZ Z@ :::::: ::::::::::::::::::::::::·:::· : ::::::::::::::::· ::::::::::: ::::; .. ::::::::::: :: _:::·::::: :: ;:.::: ' ::: j! l l;(I; ·
8.1 Completion Cettificate ......................................................................................................................................... : ........... ャ N \|イB セ C ZZ@. . . セ セセ Z@
8.2 pイッセゥウゥッョ。ャ@ セ・イエゥヲゥ」。エ・@ ...................... ...................... Z N セ@ ............................... : .. ··········· .. ···· .................................................... セTX@ セ M
9. Construction Requtrements .............................................................................................................................................. .. ...... 149 ·
9.1 General .................................................................................................................................................................................... 14-9 · t . ·. ··, t . セ@ ..
9.2 Processing /Scientific Landfillfacili.ty ....................................................................................................................... 15-p·:· ·· , . \ •.h<. セ@ ·.
9.3 Procedure ............................................................................................................................................................................. 15 3: .. ·.:,\ !:t . 9.4 Schedule for Land Requirement at the Proposed Site ........................................................... : ............................ 15 f 0,: ·. ;:: ·
.. I •··· ' I , ... .
10. Operation and Maintenance Requirements ................................................................................................................ , .... QU N M セ [[MZサNセ@ ,. ᄋZセ@ .. · r·;
10.1 Genera1 .............................................................................................................................................................................. :.156 '·,, •···;:\: :. セ@ .
•
Mセ セ M hNZセ@ .... セLNセイᆬ セMMM.
1 · -.;
セ@
.••. -. ·• · .. ZMセL[@ •. セ@ ...... _, .... _ ⦅NN LLL⦅Nセ@ ..................... J セ@ -..... ;-J- • ......... • .. セᄋ@ .... : .......... セ@ .. ;. ... .. MGᄋセᄋN@... -:·.- ....... ..... .. .... セ ᄋ@..... ···-· . . セᄋ@ . セᄋ@ ... • .. ,
10.4-Cleaning and Maintenance Requirements ............................................................................................................ I 58
10.5 Monitoring Procedures ...................................... .......................................................................................................... Qセ [ X@
10.6· Management of L·abour.and Prevention of Accidents ..... : ................................................................................ 15.9
10.7 Facilities an'd Benefits for the. Work Force Employed ..................................................................................... 159
[YM_LNtセゥNョゥョァセ ⦅ sアセゥ。ャNpイセセイ。ュュ・ウ@ and Public Grievances ...................................................................... · ... : ...... : .. ; .. 160
11. Operational Plan ................................... : ......................................... : ......................................... ,. .................................................. 161
12. Performance Standards and Damages.-..................................................................................................................... - ...... 162
12.1 Performance Standards ....................................................................................................................................... .-...... .. 162
I.
, ..... セ@
(.('; t VJ --:v (
(): <n = .........,_ (;') セ@
12.2 d。ュ。ァセ ⦅ ウ@ ..................................... : ................................................................ : .............................................................. セ@ ...... 16'4 . セ[ M
13. Safety Requirements .............. : ................. : .................................... : ............................................................................................ 167 !
13.1 Safety Requirements ....................... , ............................................ .-.... ............................................................................ 167 . .
14. Environmental and Social Standards ........................................................ .. ........................................................................ 17 1
·14.1 Environmental Standards ............................................... : ..................................................................................... ...... 171
14.2 Social Standards ....................... : ........... : ....................................... : ......... セ@ .................................................... : ................... 17-4
15. Waste Reports .................................................... : ......................................................................................................................... 176 ·
15.1 Report for Processing Plant ............................................. , ................................................................................... : ...... 176
15 .. 2 Consolidated Monthly Report ............................................................. _. ...................................................................... 17:3
15.3 Schematic Drawing of Weigh Bridges Locations_ ...................................................................................... ...... ... 17l3
16. Scope ofWork of Independent Engineer ........................................................................................................................... i_セI@
16.1 Role of the Independent Engineer.' .......................................................................................................................... l7<J
17. Vesting Certificate ................................................... _. ... : ............................................................................ , .................................. 18;!
- 18. Substitution Agreement ........................................................................................................................................................... QX セ Q@
18.1 De'finitions and Interpretation .................................................................................................................................. 18L,
18.2 Assignment ........................................................................................................................................................................ 18S
18.3 Substitut ion of the Concessiona ire .......................................................................................................................... 18:.
()" セ|@ ( ,,, ,. ,;.'
.,
. r .; セ[@
18.4 Project Agreements ........................................................................................................................................................ 18c: . -: ·;..,:;.:
lasT . . fC . A 18c-C _ ⦅Yセ@. erm1nation o oncess1on greement................................................................................................................. <; r.: ._.
18.6 Duration of the Agreement ......................................................................................................................................... 189 セ@
18.7 Indemnity ................................................ : .......................................................................................................................... 189'., . セHN@
18.8 Dispute Resolution ................................................................................................................................ " ....................... 190 セセM ··-
89 11 }\·: ;;\.
1 . Misce an eo us Provisions ............................................................................................................................................ 190 ,. .::.·
.,...-·· ·
·-:-.··· .. ·-·--.. ·-:-· ᄋセᄋᄋZᄋᄋMMZMMᄋ M ... . .,..-..,,,._. -.. ...,....,....---......, . NLN L MLL⦅セ L M___ -.-.'"" ........ "" __ セ N M .. ZNᄋ ZZZZZセ@ ... .. ... Zセ ZMN ᄋMZZMZZi ZZ セjゥ ゥ [t ZZセセjセZᆪi_セヲW W エZセZN Z@ .. L[| [ セエセ N@
•,U ,, __ ... ⦅セᄋMNLセᄋMNZN@ ,,.·,. , セMセLセLNM ..... セ[@ • ., ᄋ N| セMZLNᄋMNッNN ᄋ L[@ • ._ .;: · .. L[ エNᄋセZZNNN ZNZNMMNᄋセ[ L NL⦅ᄋLゥ セ@ • N[ ⦅L LセャZNZセッNᄋLN[LB Z ⦅LL⦅ᄋNZL@ .. Z NZャN Z セセNN⦅L@ .:. Zセ|M ,;,...,;._ .,.:, .;.·,. .. セjZLLN@ t .• LL LNLNL[LセL@ ..... セ@ .:. • NNZNLセNNN[LNNセ@ ... p-..._ •• .:,...;.,.__ ... ..; •• L N⦅ [LNNN[N L⦅ ᄋN ZNZ NN[⦅セᄋ [Z セGゥゥNZNNZNZNZN@ •• AッᄋセセセエキセセᄋNB ᄋ セNNZスN[NッG[@ • • NLLNLセ[ケNLNLL⦅セセセ@
PART I- PRELIMINARY
. . ·,
N Zセᄋ@
エNセ イ ᄋ ᄋ N@l ')·i
.:· \ .... /
....... ';. セM[@. .... ZセMM \
・ッャセlyセヲ。イイNj[エ ᄋ セ@ anセhゥゥaエ^rapセウh@セ@ •• ';}o ZNuセ@ ..... セャャ ッ@ ... S :-;; .. | ZMZZZNセ ッL ⦅N ー@ ... t:\11> iool.:. · : · · . · セャゥZ[ーエᄋ・NャセセエLセ ウNセN@ r N セィ@ Nセイッ@ ... R..' ·t-< • .skq,. mq セ M. MセセLセセ@ エ [\[エセ ヲANL@ ___ [ZyNイNョᆬ ᄋᄋᄋ Nオイ「Pセ MM MᄋwッNm・N NN@ . セセセセ@ ·.\§uiT\Qv
CONCESSION AGREEMENT a . , . A . . . .
. . セM[セッ セ@ )·.· ᄋ ᆪBエカセョ^@ 」セセ 」Zァセ[@ .;5<J<5
NM」L ᄋHAッエUjセ@ 10-0Z·Q;O:it) セセM • • • !1,1 セAZZZ G@
e55_C3o. f.'ili: gw!,.t;}!
. -6COJi'-"•Y.:k.JO::.:s :
. . セ Z@ ... , <:...::.· 'cjf . .;.,V .
r-:;6. オッNェ[[ェZセ@ セエGャセセ@ · セ M
M セセ ᄋᄋ@,. '•. 0 <( . _. ... £, n \ ..... ...- セ@ tU,
t:.'l .
. . . lA.. (l,.t fl THIS AfREEMENT is made on this ft.:-=-· day ッヲセ@ Two tィッオウセョ、@ and Sixteen at 1ft. -t :
h- :
•'' Mセセ \@. . ....... NNNセ[[L@ :
BETWEEN V; ·.· ....... ! ,. {t. -.11'' ᄋ ᄋ セ@ J
. -. · Guutur Municipal Corporation; Vljayawada Municipal Corporation; Tenali Urban Local Body .· セ@ '§ · · Chilakulurlpeta Urban Local Body; Sattenapalli N オイ「セョ@ Local Body; Mangalagiri Urban Local Body 」セMゥイM ャ@Narsaraopeta Utban Local Body; Ponnur Urban Loca• Body; Tadepalle urban Local Body : 」セ M .. セ@ Yl
·. . AND セセx@
Jindal Urban Waste Management (Guntur) Limited a cッセー。ョケ@ incorporat17d under the Companies· aセエ セ@ セ@ セサェ@1956/ j013 。ョセ@ having its registered office atA-1, U.PSIDC Industrial Area, Nandgaoil Road, Kosi Kalan, セQ@Dist. Mathura (Uttar Pradesh)- 281403 (hereinafter referred to as "Concessionaire", which expression ,., ···. _:£ shall, ugless repugnant to the context or meaning エィ・ イ セッ ヲL@ mean qnd include its successors and permitted セ@
assignsJofthe OTHER PART. · ·
The GJhtur Municipal Corporation, Vijayawada' Municipal cッイーッイ。セゥッョL@ Tenali 'urban Local Bod}i.,'· -.\··
· Chilakaluripeta Urban Local Body, Sattenapalit uイ「セュ@ Local Body, Mangalagiri Urban Local Body ; セ|@ ·
'Narsarlopeta Urban Local Body, Ponnur Urban Local Body, Tadepalle Urban Local Body are/.·.\·:. セMセ@·hereinafter referred collectively as "Participating ULBs"e· each of individually as "Participating ULE" · ··.··. Mセ@ ·;,.
and CoJ:essionaire are hereinafter referred to individuall as t e "Party" and collectively as the Bp。イエ ゥ ・ウセ NZNZZ ᄋ NMセセᄋᄋNZᄋ[Z@ . . . . \ - ,r-.. , ' ...
: セセᄋ@ 7 セ O@ \: . ·--· GN [VOカQmゥウMᄃャP[[セ NZ |G@({;.}}ilAK·',l.VRIPET ML': !·C セ NN@ .
. ' . . · ..
. ! . ,
( ...
·- ·· .. · . . . . . . ... · ..... ·-· . . . .-·.: . .. · , :· . .. : .. . . . · .. .. : . セ Z@
• • • • :. : · · • .- l
.· .· · ... ··-.
.. -.":· ... セ@ : . : . . ··': '. · ·.· .
,: ·. ·. ·.' '·
. .' NMセ@ · ...
-.· . .
., . ',· . . ᄋ N ᄋZセNZ@
'I ', ·.:·'.··,''-',
-.......... -.. , ·· .. · · .. ···. . .· . . .. :. .. . . . .·. :-: ··.. . .
. . . . ·.·. .. . ' ··. >. セM ᄋ@ . .': · .. ;::; . . .. . ·> ... :. セNZ@ . . . ·. · .. ' .:·-: N ᄋ Zᄋ[ᄋZM[ H セ@
t · /; • .:_.,. __ •. .. .· .- ウN [ ᄋ ャゥセサカゥOッセエeセセ M セセセェ ᄋZ セセPセゥゥ。ョ Z セセ@ .. ·-' ·. · ·; .·. _·. }:·:. · _:: .· :·.-_·:. ·._.. . , :: . ' ·' · ' · ·.-· ·. .._ ._·: . , . M セ G@ ·,:·:·;{
. . · · ... · . ᄋᄋᄋセᄋZ@ [Nィセ ᄋ Zエ「イQ ᄋ セセ M セセ セ ᆬセ Z セ@ i [Z セ ᄋ セbセ ᄋ ゥ ⦅ ゥN ⦅@ セ セ MZ セセゥヲセヲセセ[Z ᄋ セ N イゥセエゥG セ セ M jィセエ ⦅Z セ ゥ M セ@ Z セウZCNセ」ゥセ Nᄋ@ 、エゥィセ@ セイッャ・RエイN。」ゥGゥゥセQ ᄋ ゥセ@ 。ョ」ゥー Z エセF Z ・セウセウ Z[ NZN@ ;_ ZZ セ セ セ [NZ セセMZZセLヲN@: . · · ・セjIjーケN・、 B ゥイゥ@ _:the: セッョウエイオ」エゥッョ@ •. ッー・イセエゥッョ@ a11d nraintenance the.reof.shall ·conform with: the .laws , . ::;: '$:! ... "
· . : · .. ᄋ ーゥュ。Hセゥセァ M t9.. セョカHイッョュeュ@ .. t:: ィ・セゥエ N ィ@ M セセ\ヲ@ ウ。 N ヲN・エケ ZZ セウセ M セ M 」セウ NG Qョ N 」ャオ」エゥゥゥァ@ ·l:ules :stich 。ウGIセウキ@ ZN セオゥセウ N@ zo'oo, .:. : セMM セ MZ セ M ·. :· ᄋMセセ@policies and gmdeHnes nilated.thei·ei:o:.Tne ·concessionaire ·shall obtain a·nd inaiota.in from tin1e to . セ@ ·;'S ... J
·:: N エ I ュ・。ゥャセセ」・セウ。イケ@ 、・。セセョセセウ ⦅ 。ゥ@ セセZ。Lョ・セ@ ゥセ NG エィセ Z D」「セ、セャセ ⦅ RL@ . '· · _. . - .. :· ·: セ、 [ [@ . [Z[セ@-·.: .. .. ·.·.•·· ,. ... .. .... ......... ... . ._, .. ,. . ... ,., ....... . .. · .... , .... ; ... _, ... , ... , .... , .. , ... ,., ... , . .., ... ,. セ@ .... , .. , .. .... ァZ ⦅LN LMLLK\セ Z@. . . .. .· ,. ' .. ·. ·. . . . . .N:[_, 0 w t
5.4 LaiidUse ·_.··.·: ., · ·· . _·_- ·. ·.· : .. :.:· -.. .:: ... , .. , ... ..-. . . , .. -....... ::" ·"··.---................. _ ... , ..... _.·.· ... \ セ MN M • .-·-
... ·.· .· .. ,·: . ....._,,.. · .. · ·, .........
·, .; . ᄋィ セ ・ ᄋ@ cッョセ・ウウゥッョ。 N ャイ・@ M ウセ。ᄋャ[ ⦅@ ・ セセオセ・@ ᄋ 「セセゥ M ゥャIオセ N@ ゥエエゥャゥセ。エゥッー@ M セ ᄋ ヲ@ the セゥエZ@。セ」A@ ゥセュ、 ᄋ@ セカ。ゥャ。「A・@ セョ」ゥ@ shall ョッセ@ ·. セ@ · ; . . . • • • . . . . • . ". . . . . . . . . . . I · . ... ._
. セMMN@ . · ᄋM オウ」 N Z Nエセ・ N⦅ セ。イZョ・Zヲ_イ Z セョケーセセーセセ・ M セ ⦅ セ」セョョセセエセ、@ セイZ ᄋ キNィゥセィ N@ is .riot .. ゥ N ョ」 G ゥセ ⦅ ・ ⦅ ョエ。Ni ᄋ エッ@ エャセ・ N@ Proje.ct or relate_d_ .. セOF@ .. ,. . - · : <g:tiv.ities; fッイ⦅。カッエ」Gャ\A ョ・ セ@ l?f doubt, ·any:land'.given by the L.ead ulb M セッ@ .the; \[ッョ」セウ N ウゥッョ。ゥイ・@ Jo,rth1s セ@ 0 .' :
·. . . . ーセセJ M セセ ᄋ ウィ Z セャ ⦅ ャ ⦅@ セセエ@ _b_e. オウ・HエセH ⦅ 、・ Z カ・ャッ ᄋ セ ⦅ ュ・ョセ N アイ ⦅Z セセウセセ セ ョセAセゥ@ セイ ᄋ 」_ N セセセエエゥ。セ Z@ facilfties or:pr.emises ヲH^イ L⦅ セTセ@ 3 MセM
: .. ·: ·
; .
:'.
. . .. . ,' · rel}t,.lease or ウュQエ N ャセイ@ purpose: . :. : . · .· · . . . · .. . ·, : · . . . · .. · Hセ@ セ M · .
.. • . · .. ·.··.. .. : ,;, . ' ' i ' . ' ' i . . ·· . . .. . · · ... · > . . . . Z セ@ SZセQ @ . . ·· _· · s:s. pイ ᄋ ッ」・ セセセゥ ゥゥセ ᄋ ッゥセセキ Zᄋᄋ@ :: ·:..,· .· :._ .:· .. __ :·. __ :_··:>.-·::·_.·. M^ セ@ ZセZ ZNM ᄋ@ -_:, .. :.-.·:>:;; :-·: · : .. :--· · · · ,; ; .· . : .. _ .. · . . '. : · .. .-.: . · .'. fi : ·
· · . The·i_ettin61f)gi·es ·ad6pted エ ッ セ ーエセ」 ・ウセ N@ エIQセ@ mセw@ _shil: be:ih.ose セM イッーッ ウ ・」ヲAョ Z@ the cッョ」セウウゥVョ。ゥイ・ G ウ@ Bid. · ... セ N@ _·· -,·.i! .... Z ⦅セ@ .. ' . Stlbinittep-{n' response: to エィ・jセ・ M ア|ャ・ウエ G ヲVイ@ _N ゥZ ッゥ^VウセH[ N@ ·, -.::· , . . ::. ·,,;. ". ... ':. . : . : . . ·. •. . . セ M i N@
;, . ; '. : ウZセ@ ャGセウセ ャ セZオ[・ャI」u[[hセウ@ · ' ,: ·:'" ,, • • . :• ' : · .. ' . ·, . . , ' .· .. ·. . ,,· . • . H [[ セj@
セL@ · .. . ··: :::: __ :·!.:·_\ Zᄋ セ ィ・ ᄋM セッセ」セウウゥッセセ M ゥセ・ Z ウィセ G ョ Z セャ。ゥョエ。 ᄋ ヲセ NM⦅N セセ・ Z@ セ セppセセ ZM セセ、 M M ゥャセウ・、 ᄋ N ーッイエゥッョ ᄋᄋ ッヲ@ the landfill as per |ィセ セMI ゥヲ Z ェ@
1· .. . r :· . , .. l '· ! ..
...
'. . エ・ N 」 ィセゥ」。 G イ N セ・ア オゥイ・ュ ・ゥQエ D@ 。ョセ@ セエ。ョ、。イ、ウL@ セイゥ、@ N aーーャセ ᄋ 」。セャ・@ LaW.; . ' . . . .< •
... . . ·-·.-. ᄋ ZセM セMMᄋ NM ⦅Z NZセᄋᄋM[@ .. :.:<· .. ·.• .. :·l ' •' .• · ••.
.. . . S.'7 Mea.Suremeilt.of'MSW . . ·:·. · . : . .
.. . . .· .. : ·. . セ@ . ·• .. .' :: . . .
__ : ________ ........ ----·----.. セNNZN@ ------·----. . · : .
ᄋセᄋ[ᄋ[@ ____ _ - .... -.............. _ .... _ .. .
18. Safety Requiremen-ts
: . ')
··.' NᄋZ セ@.. :,· .. ᄋGBZ セ Z Zゥ@
. . \1.1" (l,.
t 81 Safety Requirements . . . . . . .•. . . . . . ·. • c ᄋ セQ@18.1.'1 The Concessionaire shall comply with the provisions of this Agreement, Applicable l。キウ M 。 ョ 、 |LZ セ L セ@
Applicable Permits and. conform to . Good Industry Practice for securing the safety O.fthe_. · t.:1 ヲエNセ@
personnel at the Project Site. In particular, the Concessionaire shall develop, implement an<;! . q ...•. , ···-· .. .. . . . ··- . . " . . .... .... .. ...... . . .• . .. . .. . . ...'!:
。、ュゥョゥウセ・イ@ a surveillance and ウ。ヲセエケ@ programme for p.roviding a safe ・ョカゥセ Z ッョゥョ・イゥエ@ on of セ エゥ ッオ セ@ . , セ L@ ·.
the ProJeCt, and shall comply wtth the safety reqUlrements set forth m Schedule 13 (the ·· M セ@ セ@
·:"Safety Requirements"). . {セ@ o.. ., '. .·. \ ᄋᄋLLNZセ セセ[@ セ@
• .. LNセ@ v ) :':)
18.2 Expenditure on Safety Requirements |N セ@ · .: セ@- - セ ᄋN@ (t
AU costs and expenses arising out of or relating to Safety Requirements shall be borne by the
Concessionaire to the extent such costs and expenses form part of the works and services included
in the scope of the Project. · セ@ \.:
-4_._ セ@セ@
Pセ@
セ@
. 1 .. '., !· •· -.·.: ..... .•. .
..•
'' '\
· .. . セ@ ..
·,
i ...
. ' ...
·(a) . ·. . jGィ・ N 「Ajゥャ、 ャ ッァウ[ウセイセ」エゥオ@ .. es. see(ied ana plan tea 。Nイ・セウN@ paved and un-paved trafficareas ·
·. . .. : ... .... e.tc.' a•·e エョ。ャゥゥエ 。 ゥセセセ@ ·:dean ·and: ーイッセセイ@ セエ「ッ ᄋ QLQ ᄋ エ@ dainages, thannay impede' their·
.. ·. · ... · .. ヲ オ セ」 ᄋ エゥッョ。ャゥエケ@ N ッョゥセーセ。イ。セ ᄋ 」・N@ ' . : .. · ·.· ·· ·. ·. ·. .. ·. · . _. . · . · · · ·. [HG セ@. . . . . . ·.·. . . .. .. . . キ セNGHNN ᄋ MMセNNエNZZAM⦅L@
(b) :. .; · · AIJ .n{oving· pt: fjxed eql)lpit)ent· P.)1(F ri:iac!'iil}ery-_are. -ma!qWined clean and in .goo..__-40 . .'. : . ·. M キッイォゥョァN」ッョ、ェエャセイゥGN@ ;· ,',· · · · · · · . · . .
Ccr ... . セ ᄋ i@ ᄋ Z [ セ [セ[[・Nヲセセセ ャゥエゥ・ウ@ . . ・NOッセセセッVイ@ Z セ・セ[ァ・@ ᄋ [yセエセュ[@ ャ・。」ィセエ・@ ᄋ ョセ。ョ。ァ・ュセョエ@ system, ett.;•. \ .
· ;3re G ゥョウー・セエ・、 N イ・ァオャ。イャケL@ cleaned: and tpaintained. · ·.-.: . . · \ J . . . . ··" .· ·.· ...... · . ·. ·. · : . ·, .
E . ...)
. r.;.( u .
(d) : .... Every d_ay at セャッセゥョァ@ time the internal roads and ot.her paved areas shall be inspected, 0
Z 。イゥセ@ :any ウーャャャセァ・ ᄋᄋ@ of セsw@ sh.alf be N 」ッャャセ」エ・、@ and disposed of in the. landfi ll セ ・ャャ@ セ@ セs@currently In opefation."If イゥ・」セセセ。イケ@ エィセ@ paved areas ウセ。ャャ ᄋ@ be.swept .using a swee n . I セ@
. . . . Z ュ。 N 」 N セゥセセ⦅N ZZ@ _エZオᄋゥイゥァ ᄋ aセ N@ ーセイゥセ、ウ ᄋ N@ 、ャjsセ NZ@ セセゥセウゥッセ ⦅N ウィN。ャャ@ ᄋ セセ@ ·.contr.olled by sprinkling the セ セ@ ヲセ@ セ@._-:. · .. :: , ·_. ᄋ セu Z イZNヲ。」 N ・セ@ With \Vater.m SO.ll!le.c,tl_On セセセィ@ swセ ⦅ ・ーャ L ョァ@ aCt!Vltle.S .. · · . . . . . \= c8 ;.'( ·
... . "· ... . : . . :.: ·.. : . ... · .. :, ·,. ·' .. : :' . .. . . · ZM ャNセ ャ N@. . . .. . ,..
t:':. セ@
· 1 o·.s ·.Monitoring Procedur:es · :...-· · · :-. · . . . : . . . : . . ·. · .. セ@ :,
·. /. . ....
··;. ·. ·:.; . .· . . :, .
i · AZᄋBエB セ L Nセ NBBスNエ@
. t l,;J . j
G セN セ@ .. • Mセᄋ@ ... .! •
• • 1\ • ,.. • • ᄋMBGセ Zᄋ M ᄋ@ • , • '. .'.· セ@ .- Zセ Z Lᄋ AᄋG@ Q NᄋLZセセNZ ᄋ Nᄋ@ • • ·•• ·• • ᄋ ᄋM ᄋ Zセ エN@ · :< • ·• '';'.-, ZᄋNセセNᄋNᄋ@ •• ;·.';,1
•.··.·- ' . ::·-. '.', ·.!· ·.: .. · Z Z セ@ : ... · セ@ :· ⦅ᄋ LZ L | NセN@ • ·,· ·,.-.. ⦅BᄋNセNMZZZAセセNZZヲ NセGB[ Lᄋサ NBNᄋᄋM ᄋN ᄋ ⦅ N@ ''."' ·:· r· , ,. .. |G⦅セ MMセB@ .. ' • ᄋGAᄋᄋᄋ Z セ ᄋ@ ':·: ·,· ·:•;.. ' ,. ' :·:_:' BᄋMZᄋNZセ⦅ZGᄋG@ '':: ::.;c ,. ··•· • ᄋセ@ ·:·. セBMN@ Gセセ@; HNセ N@ . . . MセMMMNセキNMMMMM ᄋᄋᄋ [N N N@ •·. .. . ......... ;,. ... . :...
セMNNN@ . . ッNMM]ᄋᄋセ」@ ZLNNN[NNNNLNBセWNセᄋᄋセセZ]セセセセセMNZNZZRᄆ L NッL M[Zゥ Z ᄋ ]][LZ ZMZ Mᄋ[セ セZ セ カセ ZZZMZMZZセZゥWZM セ[N NLセZセ Z BZBZZZZセセGZZZセ^セᄋセZBBセ@:' >....:·;·"-·····
I . · ... : .. I, ...
' セ@ .
1'·: I·; I. I . . ; ... ·.
, ·
{ ..
:· . . ·:·
::
. ·.· . "' . .
·,J
.,
. . . セ@ .. '•,': •. •
· . . .:...·· .· ... .. ·}. .-.
.· ... ' .. セ@ ; .. -·- '- ..
'·.
,·.
..... . . . .... ... :·
,l .·_ ·
. ; · .. · .. .
... . :· . .; .' ·.· ·,
I • •' • : .
·. ;: ::·.
'· 1): iAャウエ。ー 」セウ N ッヲ@ 、ッGキィエゥュ セ@ of . • : ·. · ·:': Nif : · . . .. ·. OperationPerfortjl'ance . ·
. :·· . キ・ヲァィ 「イM ャ」jセセ セ ᄋZ 」 セゥ IZィ ・ ᄋ ーイZ ッ」・ ᄋ ウ N セ ゥ Gョjサ@ .. ·· . ·: .:;· :,·:: .. ;. ···::· ·· .. ;. ウ セキ イゥエNy N@ セヲエセセ@ r:a.·te of · p N ャセ AI エI Z キ N ィセョ@ ウ L セ セ ョ、「ケ ᄋ 。イイセョァセュ・ョLエsG@ : · · . ·. ·. ; : , ·. ZPN セ E@ セ 。 」IQ N@ dais G、 セ ヲ セ オャ N イ N@。イセ L 。ャウ N V@ 09t アー セ ゥ」L エ[ ッョHAャ ᄋ@ . . . . . . . . : ·: . . . .. . . . . : . .. . . . . . ... . . . : ' . . . ᄋ セ@ . . : セ@セ@ . ..
•. · ·r
· : ·.. セ@ h ishifts :· · ·:. ·: · ッ ー・ エ Z 。エゥッセp セイ ヲッイ ゥャオ ゥ Z ョ」・@. .. · secui:ity. at the rate of
. : .. PNセE@ each day's default · · ·.·
'.'
:: .. ;
. ' . .. ' : ..
Daily Repo.rt .
· ... .
... M MM MMMMMM セ MMMM セ セMM セ セセ MMMM セセ セ MMMM MMセ MM セセセ MM セMM MMセ セ MMKMMM セ MM セMM MM セ@
3) dー キ ョセ ゥセ・@ of any moduie セヲ@ the·· . ᄋ セ@ .9.0 」エ」ゥ セ ウ@ · . .. ·:: .' :.: G ッ ー N ・ イ 。エ ゥッ ョp ・ イヲセᄋゥᄋュ ᄋ 。ョ」 ・@· Pr.oi::e.ssing' p ャ セ ョ エ@ Gセᄋ@ · · . · . .. :· .· . . . . . · . ·sei;urityat the r-ate of
. ; .o>r% ・ セ」 ィ@ day's default . · .. :.:· ·. ·.·. ·· · . . . . . · .. · .··· .·
. セ@ : . ·. ···:. . ..
·' " .
. o ·aily Report
. ·. 4} i ョウセ@ rices when イ ・」 ケ」ャ 。「ャ ・ ーイ セ@ s.old · Nil · : · ·. : ··. : · in ·Jpose fotn_1 · · : · .. : : · .. . . · .' ·
oー・セエゥ 「 ョp ・ イヲッイュ。ョ」 ・@
s ・セ|ゥ 「エ GケG。 エ@ the ra te of Q.l%e ·tfi' 。ZケGウ ᄋ 、・ヲセオャエ@ .::
Random checks
· ...... .,. .. . · ...
,' ,•.
. ,
. . . : .. セN@
. .. _·
'· :··
(:.
I:<. ! .. .. i
セ@
1 I
1· .:
r· I· :.·.
. · .
... . :
• •• p
. ' ...
.· ...
· .. . ... • I • • 1 ••
. · .. . ... .... :·. p ..... .
. . · ·:: . • •••• i • : .... . セ@
,._·;·
. : :· . ..
ᄋ ⦅Zセセセセ ZイNセセセセ セセ[[ZセセセL Z ᄆセセセセ[セセセセ[[[セイセᄋNセNZセ[セZセセセセセ]セセセ@•• :. ' •' • I .· . . , , .- .. . ·. . . -r
; • • • ',' • '· .. ;· .. ·. ; ,_' '._ ·,·v •, .· ", : : • ' :'·,·, セ@ '.\ • ·. • • . i:: . ᄋᄋセ_@ .... i •. • • セᄋ@ • ' ' • ' • , : セZ@ • • ,: セ@ • • •' ' • ' ' ' ' • •, ' • • • ·' I ' • • \ , • , '• , •
. · . .' i • . • • •• :·· ··:: ·· . . ... . :· · :- .• • • •• •, • • . · :::::;· •. . セ@
.•. ·, .··, . . . ... . . . . . : . . :,, : ·. :. \:.--: .. : .. ::;, ....... ·, . . . " t k_l!.' ....
. :: :.. ·, .. : :·: .- ' ... _··:. ,: .. :. . ... · ·. ··.':.: .· セ@ ·:·, · ·. ' ' -·. · · :·w· -- QセN@
__ -::;_· .. · · .. ·.· · .. : ,_ - :: 0::·. <. · .:·: '. セ[ Z MZN@ : .. :·: ... . :. ZᄋN ZM セZ セ[ p ⦅ セMセMセゥ@ M セセ N | セセMイセセセ セ NM セI N セイ@ セ L セ@ NZ N[セ L ュAセ⦅セセセ ゥ セ セ「@ セ@ Z セウNセ@ M セイ [@ セセセイ@ 。 M セ@ B ウー M セ」ゥセセゥエゥョ」ゥ・セ@ ... : セ@ セ M. :' , _. ·_ .· · .. ·_ ·':-: _·: ᄋᄋN⦅ ッ」 セ オー 。エゥッNョN。ャ N s。セセエケ@ セ M ョ、@ h・セAエィ a、ゥョ サーヲウエイN。エゥッセゥサosh N aIN@ · · ·. .·. · . セ@ ?: -
· · · · :· · ••• ·.•··. · · .. · .. · > .. (gj. ·:· .. : ' cッョ 」・ゥセセ セ セy セ@ [ [セゥ\iゥ@ Z ーイッjL ォ ᄋ セセ セ M ᆬセ[セ エ。I[[@ ヲセィ[セ L」セゥ@ · 。セ、@ ヲャCセュ。「@ Mセ セセ Mᄋ@· · · · ·-. : · .. . . · .. · ·. ᄋ イョ。エ ・ L ZイセゥZウ エッャセ。ァ ᄋ ・@ ·area··.as :d:esci'ibe<i' iri エィM・ ᄋ 」ッイゥエイ。」エセイN ᄋ Nウ ᄋ \セヲ・エNy@ r ・ アエゥゥイ・ュセョエウNセ ・NI@ · · .}!i
I ·. : ,.·_·.·.:.: ::: ·_ ·.· ·. . . . OセGZ@ ..... :·· .. ·. :. : ::·: :: • •. : Z セ、セセアセセ ⦅ ゥ G エゥゥGセ@ :.·fen;_; Zᄋ セィセ@ セ@ ᄋ Mーセ ᄋ ョ N セセ、 L ゥ [@ ^ セ[セゥャセセゥ G fヲO [N@ 。NZイゥa ZG ZMG エゥN G セセ@ : セ G ヲ@ . ᄋᄋ ャI・ヲNセウウ。 N ャGケ B@ .. ウセヲセ」ケ@ . M セ@1 : · :<· _.·.- --.::· ·.. _· :. · :_- .: . ; : _<_: :· _· .-: · · NM ・YセZpNキ・ N ョォエャj N Yy N セijA CN@ ᄋ ー・セセッセ ⦅ 。ャ Z@ pNイッLエエGZ」エキ セ@ equ!Bf!!:ent (PPE) and apparels for .. . <}_
I : : ·. .•. . セ@ . . . : : (h) : / ZZ[LZッZ [ ᄋZ[[ゥZZLZZ jー ZョイZZー・ゥᄋ j ゥウセゥケ@ ウ。ヲ・セ@ M セ[セエゥョァウL@ including エセ・スセ@ i . , I . :. · · .. · ;. : .: ·.· < 、ゥウcオウウゥセョ M Vヲ@ . セ「ウcセo、@ 'unSafe セッイャ\ケ[ᄋ。」エゥ」oウ@ or cッ[エ、ゥエゥセイゥウ@ 。セ 、@ a review ッLヲ セ セセ@; ,_· · · ᄋMセ@ · : · · .- · .. _. · _ 。ョケ N Zᄋ ヲィL ⦅ 」ゥセ・ ⦅ ョ エウN@ .. an.(i ᄁセヲZセ・」セ ゥカ セ@ ·_ セ」エセHI N ョLセN@ : .. a、セゥエゥッョ。 N ャャケL@ en.courage, solicit ·and Mセ@
·' ' · .. Gヲッャゥッセ@ tip ッョウ。 ᄋ セ・エIイイ・ャセエ・ N 、 ⦅ Duセァ・ウエゥッョウ ᄋ ヲイッュ@ cッョ」セウウゥッョ。ゥイ・@ employees. ·_ ·2 · . ...
(i). :. :. r・ーッエ ⦅Mセ@ ·an ゥョェセ、・ウ@ and Nゥョᄁゥセ・ョエウ ᄋ@ Jn' .a timely セ。ョョ・イ@ in accordance with .. :. ᄋZ ヲ・、セセ。IN@ 。セセOVゥZNGZNウエ。エセ NB ᄋ エ。セウ Zᄋ@ ahi:f'. イ・ァオャ。エゥ M ッョセ@ a·n,ci · the NG 」ッョエイ。」セッイ@ Safety セ M ;;_
· ... セ Z セ ᄋ ア ᄋ セ|イセセ N セセ Z エセ ZZ ᄋセZ ᄋ N⦅ LM[NᄋNZMM M LN セ@ .. :· .. MN ᄋセ NZNZ\⦅ᄋ@ .. ,·.: ·. .' ·'·; .. : ... ᄋセ GQ@ : . • · .. . . Mセ@ :' . . • , . .• a.: :f .. ... ,... .. ·. . . ·. ·.. . . · . · ..... .... ·:.-:: . . . セ M セ@
. ·CD _·. · N Z aョセiケコ・ ᄋ 。ャャ@ ゥョ」ゥ、・ョセ ヲ。 ョ、@ implement immedjate c_orrective action. .., § Z セ@..... .... :: .. Z MZZ ᄋNセᄋ@ .... · .. . :-._ ·: ... ·:>:: ,·_.·,.· .. Mセ@ .. · '.. . . _>·' ::· .• •• :·-:. ᄋNᄋセM ... • . セMスセ⦅ZᄋZ⦅NZᄋNZᄋ@ .• \ ·: .•• セM N Zセ N@ :. セM . • . •. ·. __ _..: . ᄋG セNNNNN@ g E
: .·,':· ··
___ ·:·._..· · _-·: _··.-. > Z M N 」セイ ᄋZ@ .---:_··Pt6_vid_e· ェセエゥ ZNZ セセセセ M セB N Bゥセ M セセU MM カNL ゥ ゥョ@ ZZ セセセイッセセ ゥ 。 ᄋ エセ MM ᄋ エセゥhィセョセ MMセ ュ。エ・イ ᄋ ゥセiウ@ MG エッ ⦅ᄋM セッョ、オセエ@ セ M ェ@. . . .·: . · · ,._: · . :·. . · . ,. · ᄋ キ・ セ ォ Aケ B@ ウセヲ・セ ⦅ Zᄋ Z ュ・・エゥョァウ@ .and NZ⦅ZN 。エエ・セN、 N@ ·. said · meetings· to ・カ。ィNQセエ・@ · the11· ....... .. l) .
. ··· .. _._·;· ,:-·· . .- · M M M [セGNᄋセᄋ セ Z ᄋZNZセMZM [⦅Lセ@ ... M⦅M\ᄋM セZ Z ・ヲヲセ セセセ Z セセ セ M セエセ| Z@.. ,::>·:·:<,:'.:::·::-·:-.... Mセ@ .. : セ@ · .. ᄋ ᄋ Zセ ⦅ MᄋNZᄋN ᄋ@ .. ,' ·. :_·: :·· _.. . ·. · . .. · · · · .: · . __ .:1 セ セゥ ᄋ@ · -:.; .. . (Q : - . · Mjエセカj N ・ケャ N@ セ。ヲ・エケ N@ · ャ_ Nᄋ ・・エjイゥ N セ@ イ L セZ[ーッセ エウ@ · su_brnit):ed_. by _'ji:lb .. supervisors and エ。ォ・ セNᄋᄋ@ ·, i
· · .. _ · ·, .- . · · . .. · M ョセ」[ セウウ。セG ケ ⦅ N 。」 N エゥッ ⦅ ョ@ セッ ᄋ@ ensu·re 'that the job s't.ipe.niisors 'h'old M セ セ。 ᄋ ョゥョァヲオャ@ weekly
:.··
; .. ··.
, . . -. .. r. I -I
.....
!' • I •
i ...
·: .... ·· , ; . ·' .. ··.
... セ@ -.-:-: .. _:.:·-..!.- .. ·-..... :--_: __ G⦅ZM DアヲG・エケョェセ Z セセゥセァサ [ ᄋ Zᄋ ⦅ MMNZZMZZNZMMG[ZZZ\ ᄋ Z⦅GMZLZᄋᄋMZZZ@ .. · .. ·· ·:-: · . セN@ . . . ·.: . . . . ': . .. .:· . . . ·. . . •. .. . ·.. . : . .. · :': ·. : . . ..
_: · ·: .· .. · . ·:; ·.· : ·. · .. {m).'- :_: M ャューャ ・ ュ・セエ@ セ。ヲ・エケMエイ セ ゥョゥエ ᄋ ァᄋ ⦅@ ᄋ N pNイッァイセイゥQウ ᄋ@ ·.for ·Contractor supe1.:visors
' . ' . .- :':: ·. ... . :· · . .- ・ヲd G ーゥGッケ・・ウ セ 。 ーー G ャ ゥエセqャ N ・@ エッ NG エィセゥイZ G ウー・」ゥヲゥ」Lイ・ G ウーッョウ ゥ「ゥャ ゥエ ゥ・ウ N@NM セ ᄋ NZ@ .. _.... . . ·<' : . . './. . . · .... · . ᄋ Z ᄋ N Mセ@ .: . . .. : • . :: ·:.··; . ,·, •' Nセ ᄋ N Z BGG@ ···: セ@ ᄋ セ@
-- (n)··_.· . Main.tail1 ャゥセエ@ Z ッセ セ [ゥ G エ セ ZZZ セヲM Z ー・イウセ M ョゥャセサ ZN セセセ M ゥャ。「ャ・ N@ for . first .aid and .. emergency . セ@· · エイZ・ 。エュセ ョエ@ ヲッイ M セ⦅ョェセイ・、@ cッョエイ。」 N エッ イ Z セューャッ ケ・セウ N@ · · .· · :. . . -'
( oj · .•• cッセ」・sウゥセセセ[イセ@ .;il; 「 セ@ イ⦅・ウpアョセ ゥ「ャ・@ ';or セッ カ A 、ゥ@ ョセ@ a'sare,;. ッセゥ・ョエ。エゥoョ@ エイ。ゥイゥゥイゥ セ [ セ ᄋ@ · セ@. .. . ·. ウ ⦅ ・ウセセ_j_@ for 。ャャキ ⦅ ッイNォ・ゥZD[「・ ⦅ ヲPイ・ N セセ・ケ N@ 。セ・@ allowed to_qegm work:-Tiie onentatl0rl\J!.1 セセゥGゥ@ セ@
.: .· · ·safety·. trairiing·· -...v-m :_:o'e .. conducted . by :tne ··'authorized-. イ・ーイNセウ・ ョエ。エゥカ ・ ᄋ@ as .,;; セセ@ セ@ ·
.. · .•. : .: · .. _ · ·. · · セ Z@ _- セ [ オァセセウ Zエセ・ ᄋNMN セセ M lセ。。 ⦅@ セセ ᄋ セ M セ 。ョア@ M セュ NZ ゥ セ セセャセ、 Z ・@ Z ゥゥZウ G オョゥュセイIᄋ ⦅Z セヲ@セィ・@ _ContraCtor ウ。イZエ セ Z@ .. _:)N M M セ@.·:, .· .. · · .... ,' :_ . -_.. jZ・ァ セ[セQ セ・イ[ョ ・セエNウO@ ⦅ャゥ・。、ウZセー N s。ヲ・エケNMtイセョョュセ@ and ayvareness. . "'-.... ᄋᄋコエイセGヲ[A@
:·:·:_·- :.--_ .. , ._ . . ·." ... :. ·_. __ : __ ': · .. _· . __ _ · ... · .. .- -: _::· .... ·. · . . · .. ·.:· · ... . . . . セ セセ@ セセ@. : (p}. : · ᄋᄋ aセ@ _a_' rninimjifii· サ[ッョエイMHA 」セッエ@ representa.five. tt>adeqi1ately train its employees- - :2:
: .. :·. ·. ·... . . . 。」セVエZ\ャ N ゥ Z ョァ@ キ G 。セー ⦅ ャゥ」セィャ セ セ O_セ ヲセエケ@ セエセイエ、。「Zャウ _ エGャセゥセ@ .. セイ。ゥョゥョァ G ェZョ。ケL@ inchide but is· ョッセ@ . セ@ ·
.... : :_- _· : .'. . .. ... ᄋ エ⦅A ᄋ ゥヲゥェセ・ア Z ᄋ セセZ G ᄋ ヲ。Ql@ ーイッエ ⦅ ・、ゥPゥQGセ Z ヲゥイ・@ .watch; :$:cg_ffq!d•s;_fod<ii_f.ts. ・ク」セケ。エゥッョL@ }adders, • ;A . . - . . . . . .. ·_ :· .·_ .:--. ·. 」ッョヲャセ G ・ 、@ :_SP.aCe . entry,': N iGセNGApセャZセエッイケ⦅@ 'protection, . oshaセpウmZ@ (Process Safety
· · --_ . :· .· :: mセ M セ M 。ァ・イ[[[・ョゥス^ァエVカョ」ゥjゥNサァL N セィVjZゥゥゥァ ⦅ [⦅ョ Z セ ] エ G イ 。ヲヲゥ\Z N 」ッョ エゥ Zセゥ・エセZ ᄋ@ · .· · · . . . . . . . . ·.. ·.. . : :_ :- .; .... Zセ@ .... :· . . . : セZ@ . . . . ·. . . : . :. •. . ...
. .. ... .• . :.:.:.: ._·:· .· .. :,····.- . ..
.•. . '
. .. . · .. · . • : ! ! . • ·. • ' セ@ .. -:·.
. ·, : . ..
.·',
I ,.
: · . .
:, .·.· ·
:, .
... .. . '
:: .. . : [ᄋMNセ@
... . .. .
. : .
· , · . . .'
. .. ::
. . .. •'
·. :·:· . ᄋM セᄋ@
. . :: セ Mᄋ N@ ·• ·.. . . . . . :· .. : · ... · .. ·.· . . . . ·:· · \ , , ·. . . . . .
. セ M
セ@ . . . . ' . . . . . . . .... . . . '.. . : . \ ·, . . .. , (q) : .'. ·. ·. In the セカ・イゥエ@ :pf a: キ ッ イォ Z イ・ゥ。エセ、@ G ゥョセゥ、・ィエ Z ゥᄋ・セオャエゥセァ@ tn a cッョエイ。」セッイ@ ・AGイQーャセケ・・ Nᄋ@ .
: : G |セ ᄋ ェオ イケ ᄋ@ or. ョ N ・。 L セ NM ゥョゥウウ[@ cッー エイセ セエセャᄋウ N ウャャ N 。ャ⦅ャ N@ rwtlfY. エ「セゥイ@ ⦅ aーーッ N ゥョエセ、 Zr・ー ᄋ セセウ・ョエ。エゥセ・@ .
• .. セZ@
· inimedia.tely:· .. ,, · · ·... · .·. > · · · · · · · · · ·. . ... ,;.. . •.· ... '
• (r) N セoAャエョゥ」セイセ NM Zセィ 。ャゥ@ [イセセゥ、・@ the:a.ppointee\: イ・ーイセセセョエ M セエ ゥカ セ@ セゥエィ N@ セセ@ ゥセゥエゥ。Q@ イ G セーッイエ@. .. . . . .. .. . , . of incideJlt; . .' .i:n·. yjt:iti)1g,· セwャセィゥセ N@ ·.24· .hPtli'S of 'the .. acddent. Hiu:d ·copy' or .. · セ@ ·· : ..... · :'.: · ·:·· ᄋ N ᄋ Z Z セゥ セg エヲッ N ョヲNセ@ ヲVイpj。エウ Nᄋ 。イ・ L セgᆪ[・ー N エ。「ゥセセ Z NZ ᄋ ^N@ · ... · _ _.· .· ·.. ·. ·.· ... ; · · · . ·. ::l
•· · . ( s) . . •.. ·. · cセエ|エゥセゥ[ッIウ L@ ihal( pt;vid• a: 」ア qャーャ・ゥZ ・セ@ Oce; セ ᄁュ@ ゥ ョvセ Aエャァ。 エゥッョ@ +Opoft within . ·.··• ᄋᄋ セ@ N セ@. エ N セイ N ・・@ .(3). work_ing «;lays M セヲ@ エィセ@ incident: セョ N@ the' event, their. investigation . : <n 5
.·. ._-r.equires more エェョセ・ ᄋ@ to ゥョカ・NNウエゥァ。セ・ ᄋ@ .du·e to the cqmplexity o(the ゥゥ_」ゥ、・ョセ@ セ@
:Contractor-s shalf 」VイゥャセlANャQ N ゥ gセエ・@ ᄋ セッ@ the 。ーーッゥョエ・セ@ Representat.ive l.n キイゥエゥセ ァ MN@ セ@ · . . _:; ... ゥョ」ャセャ、ゥ ⦅ ョァ ᄋ ゥ ョ エゥ N ュ。 N 、ッGjャ@ tp N ィゥァ ᄋ ィセイ@ authoi:itles· o.f Lead U-i;13. Thi.s commu.nication .· .· 8 セ M .· · · セィ。ャャ@ ゥj[セャセ N 、 セ L@ エ ィ セ N ᄋ@ ゥ Dセ オ・[@ セセセウゥョァ ᄋ@ セQセ・ ᄋ@ 、セャセケ@ 。 N ョセ@ an ・ウセゥュセGエ・、@ ゥョカ・ N ウエゥァ。エゥッ セfス@ .-). セ@
· · . : . .. 」ッュー ャ セエjoョ@ dc1te. . : . . . . . . . · . . ,., セNLN@. . . . . . •. • - .•. . . c:(.
.. (t) •. .•. . Zセセセ[ウZ@ 。ZLセLエセ[[ゥZZZヲセセエZセエセセセZZZZᄋセZセセLZセZセイ、 NZ[ [j[Zエ セEセ セ[セZ」[セ、Zセセ@ Nᄋ jセ@.rel_l?rtJng セョ 、@ N ャーセ・ウエゥァゥャセ N ッセーセセ」セ、オ N イセ@ 「セ@ fmtia.ted 。セ@ outhnedprev10usly. Q Hセᄋ [@ セ@ «. . . :. ·.: : :.· ... ··: ·. ·' ... >·:: ·,.·: •... : .. ·.· . : .. , · .. -·:·. · . . ,· ' ··, .. , .: .. .. ·. ·. .. "'· . ..1 M uセ@
en) .: ··. · ZセエセP
ZsZセ N OP
」jセZセZZセ M セZZセイAセセセ ウ 。セセセセゥ、セZゥエセ[セセセゥQセセ[ZイZエセVセZ セョ ゥ^ゥセセ ・[[Z セセ@ . M M セ@. ·. s·a.fegu;rd G 」「 N ョエセ。」エッセᄋ@ :employees キ「ゥャ セ N@ セッイゥゥゥ N セセ@ :on ULB .Sites. All Conr:actor J:.. セ@
erppl9yee:; wm N 「セ@ trained in the. use ofthis·pJan and jnformed of their role in . . セ@ ᄋ セ@ .
. . Z セセQー M セセ N G_・セエゥセセ@ iE セセセゥセセ Z Aィ L ・ゥ\イ・セーゥ N イZセ N 」ゥ@ N ウ セ セ・」ケ@ セィ・ィエ\エ ⦅ エゥッNョ@ ᄋ エ イセゥョゥョァNG@ Thi.s ーッャゥセケ Z@ · · セ@ セ@ . · . Qセ@ )!landatory ·and !ll.u.st ·.be . Stl'Jctly. ヲッャャッキセ、@ by all c;ontractors and their .r·9 ·· g: ... . . . .. . .. . . . · •·' · · '· · • ' ヲセ セ@ o-
.. · ーセイセ_ ョョセィ セィゥャ・@ セッイャセセセァ@ ッョ N DAエセウZ@ : · · · ·· . . ·;. 1 . . · . , • . · · · .· · . ᄋセA[ N@ セセ・@ セセ@ · .
. . : :'(v) .. : M セセ セ ・[i ⦅セ ョセ セ ゥヲェ セ \ イZ セ Z ゥ ᄋ@ ᄋ 。ョ [ ᄋ セᄋ@ セ M ュ セ イァ・セ」ケ@ .' Z ・ セ N セセセ。エゥ セ セ@ .. ; (an Zᄋ M セオ、ゥ N 「ャ・ Z@ · 。ャ。イセヲカ・ Z イ「。[@ ZZZ セ@ , ᄋN Qセ@ . >. aruicn1·rlcerriel1t- wHt Qe セセ・ G、 ᄋᄋ 「ケ N@ Z cッョ」・ウセゥッョ。ゥイ・@ .to :alert •em.plciyees . of an
. ·. ev:a.cuati.Ol1); エッ N エQエイ。 」 エセエウ ᄋ イエゥセウエ N ゥイイゥュ・、ゥ セ [エ・ャケ・カ。 」 オ。ゥ・エィ・ゥイ@ ー・イウッョョセャヲイッュ@ the . . ·
· ·Project Site·, per.form q ャゥZ・[。Z、 NGZ セ アオョ エ 。ゥャー@ N AG ・ ーッQ セ エ@ イョゥウウセョァ N pNセ N セ セ ッョ⦅Nョ・ N ャ@ to concerned : · . ::2
G M セ N@ ゥョ ᄋ、Q。ィゥ N セ@ セイ@ M セ ィセ Z Nヲ。 セ ゥ N ャゥセケ@ セエャ、 NZ セ。ォ・@ C\ppropi;(a.te N ウ N エセ ーセNヲセ セ@ ゥョカセウエゥァャZャセゥ M ッイイN@ wャゥ セ@ <·"", セ M r.;e • · , • • • . • . . . • . •• ·., • • • • .••· • ·' •·. J
· . ¢vacu.ating any,· _b.uilding; ᄋ ウエイャャ セヲオ イ ・@ 9'!' i9b site •. empl()yees should オエゥセゥ コ・ N@ the·-·---· -w=---.q .....
. · Z イ[セ。イ・ウエ@ .e)(i.t to セ セィ・ョ カ@ p・ G イセッ ョ ョ ・ ャ@ wi'fi. remain at the 、セウゥァョ。エセ、@ site un.tii an· all- ,, · セ@
· : · 」L ャ セ。Nイ M ゥウ@ セョョ N ッ オア」 N ・、 G ッイOHjイエ ⦅ ィ・ イ Z ・カN。 」 ᄋ ア。エゥッjセ N ウエ・ーᄃ N 。イ・ Nᄋ ッ ᄋ イ[ ア・イ ・アN N@ . · · .. .. (<(\ · セ M セ@. .: • : • •• . •• • .. • • : •. . • •• : : • • :, . . .... : : : . •• • , • • t. . : Gセ@ ᄋ NMZ ᄋセ@ M セ LZNZッ Lャ@ セ@
.. .. セキI ᄋᄋ NZZ N@ . セ M セ」 N ・ウウゥNッエゥ。 h Z ・ ᄋM ウセ セ ャャ _Z ッュセ N ャセ NZ@ :wit); ·. セィ ・ Zᄋ M セセセセ ー エ N@ イ・ケゥセゥッョ N@ セ。ヲ・エケ@ Rules : &. GML セセN@ C> . . pセッセセ M セ M キ セウ@ : セセセZセオセ@ .. NN⦅ウア Nョエイ。 N セエHIイ ウ@ .· Z セィ。 L ャセ N@ · ーイ セ _vjセセ@ M セアセアオ [ 。エ・@ fire . protectton M セ M --.}_l . ;:: セアセゥーュ ⦅ ・ョエ@ 'i-!1·· ・ セ」ィ@ .of their· Dエッ イ セァ・@ 。イ・セウA@ N セヲヲゥ」・ウ@ .and other temporary' •. " ᄋ ᄋ[ Z|セ@ · .strU,ctut'Os.. . . · · · - · · · · · ' \ZZZZセセ@ セ [A」@ .
. HセI Z@ ·.. : cッョセセウセゥッセセ M ゥイ・@ is:· イセ ウ セッイIウH「ヲ・ セ ヲッイ@ :ori.enting_ ・ューャセケ・・ウ@ .on the ·specific ·safety セ@ M セ@· .. ··. . .· ⦅ [オ ᄋ ャ セ ウ ᄋ@ エィ。ゥMAQjセsエ Z 「・NNイッゥエ Y セ・、 ᄋ@ by 。ゥA ᄋ ーセイウ セ ョ N セ N@ w9rking pn pセZッェ・」エ@ f。」ゥャゥエゥセウ@ .. Qther" セ ス@
. ·. . ·' :::. , ·. · .· [ M ーセャᄋDッョ。ャ@ ーイV ᄋ エセエエ ゥケ ・@ .. ・ N アエQ N ゥーャョ セセQエ@ :(Pp.E.j ゥウ セ@ aisb' require-d: in 。」」ッ イ、。セ 」」@ with the · ヲZセ@. .. : . ·.: .. : · .. : ::· .· .... :.-. ... ' : ... .. ·.· ; .:_::-"· ·. :._·.·.<· · : . . . : .. · . . .. · ... . .. (,-:j''1.. . l/)
· 1 $<} · .. · ᄋ セZZLNカB@ ·
. . . . . セゥAイョャ「セr@ .
· cAM| Q |Nai\Nセl uヲャApet@ イᄋセ unicipality@
.. : .. . ·,.· . .. ......
·.·.
'; . : .
. . . •• : ' •1 0 ' • • セ ᄋ@ ......
:• . .. :
... . .. . 0 . ".
.. • ••• o • • • • • •
·· .. • ..
. . ' . ; '
>-エMセ@
. ; .. · . ·:J . <(
:_·'·· . . . . ; . [ 。ー L ーイセーtゥ セ エ・ ZN セ [ヲ・ エケ ᄋ@ s Z エセセ M 、。イアウ Z@ Z 。ョ サ ・セ|エゥーqj・ョLエ@ 。ウ ZᄋN ウNセエ@ セケ@ .,the .. ュ。ョセヲ。」エオイ・ᄋ セ@ . セ。 N@.'' · · . N⦅ Dー・ N 」ゥG ヲゥ」 。エゥセAセDM A iist·. 6{t]l __ e .:ri;iri1m_· Zᄋ オセQ L ー ・セ ウ Z Vョセゥ N@ ー M イ セエ N ・」エゥカ・@ requirements is as . 0 z
Hィセ@. . . . . .. Z ヲアャャッカケセZ@ , ZZZセ\@ ,
1· ·. ·· '··.< . ,. ·, . , , セ@ .
. l · · · · . . . ·._: :.···.: ·_.· · ·. · · ..• <· .. ·.(i)_ :· :: ᄋNZN セィ・N⦅ L[N セッョエセセ N 」エッヲNN@ セィセャャ ᄋᄋNᄋ セセ@ GイN セウ pZセョ N ウセセ M ャ・@ . fo.r セ ᄋ セイッカAセゥセセ@ an.d .. :: g :_ . ! L
5 .' :.·;·_: .:'<, :.:·. · .': ... . <· .. ·.: ·.;:· .. < .. :· .... .- セZ ᄋᄋセ ᄋNZ@ -:.: ::;_.· ZZ ⦅ ᄋZ ZZGZZMG エ[_ Q セZ セセセ セセ[[セセZセセヲセ・ ⦅ GQセセイ・⦅、@ ケセZZウッョセNセ@ ーセ セエ セセエセセ セ@ ・Zュー セj@ . ·. セ N@ ,.
{ • · .·• · · . · · · . . · · : . : • (ii) .: •• a[セHセセNセ@ セ。ゥ、@ ィセセ[@ セィセャャ@ be IBセ[セ@ セエ 。ョ@ t imes while on エィセ@ jイNセ@ . . . · J · :::;_- ... . .. :.·. ·. ··: .. :::· .. .. .. ..·· $ite. ᄋ QNセ@ is .. イ・アオゥイN ・ Z、 N エィ 。 N エ ᄋ N ・セ」 N ィ N cッョョ I エ」エーイ@ use an aュ セ イゥ」。セL・ZZ@ ·
· ·, _·: · · · .. · · · · . .. .. . . : ·.:-::::.::, .. : ... · N n。エQセョ。|セ セセ イゥ@ .. 。セセセ M ウゥセ N ウセェエセセセMcaセ@ .. ウゥセ ᄋ セ ーーイN セカ ・、ィ セNイ、_ 。エ N@ H セ@ セ@ ·· .· -t:
· ·. ·. -': . . ·: ... [⦅ G Hゥゥゥセ@ .. · . N^⦅ セ。Nヲ・セ ᄋN ァャ Z セウウゥウL@ セセゥ」セ@ ュ N ・セ G エ@ 。ーーゥ ᄋ ゥセ「ゥ・ ᄋZ ansi@ standards, 。イ セ ᄋ セセ@· ·.. ·. . · ... · · .. : Nイセアオゥイ・、@ ᄋ 。エG⦅[Zセ ijGN エゥゥZョ ・ウ@ ᄋ セィh・@ .on the .Site a_nd should intlud.e o セ@. ' .·.. . : · .. · .. · .· . . · .. ' ·. . . . . . . . ..· . . ·_ z
:.·.:· .· 1: . . セZ@ .
.. · ..... · ... :··· . . . .· :·. , '· :·: セーーイセカ・L、 MZ ウゥセ ・ ᄋZ ウィゥ・ャ、ウN@ ·OnlY. cl.ear セ。ヲ・ エ⦅ケ@ glasses are allowed · .. 2
::.· .. NNセ N N@ :--- .· . . :. ·:_- _· :. . . . · ·.· .. to. be セ ウ ・、@ .insid.e セセセゥャセゥョァウ ᄋN ッイ@ ・ョ」ャ ッウセ、@ ウエイ オ 」エオイ・セN@ Shaded c;r-·£ : ·.· . · ..... · -. . . ' .. ·:; . -·.: . : ·.': --:· . . .. goggles 'ck'·hooos lrJay G 「セ Z@ used キィゥ ᄋ ャセ@ welding' ·or cutting' 。NN セM .§., .
' . . . . . . < • .. :.. . . < セZセセセNイセセNーセNLセセ[セZセ@ [セセ ZZ[セ@ glasses with ウ・ ャヲNエゥョZセセ Zヲ j@ 1 1 · .:.. . Hゥ G セI@ :: J>PJ;: N セィ 。ャj@ .. be·. worri while· tra:vellihg 'from the· security ァ。エ ・ セ@ セ@ § .
. . . j. }· . '
> . . · ··
:,. セMZセ ᄋ@ ..... . .
ᄋ セ@
. ' . : ' . .·. . . ᄋ セゥュ ・ ᄋ Z@ エイセセセャゥゥョ N ァ@ .. thr6vgh GZ エィ セ@ pia'nts, · workirfg . outside 01' . ^ セ@- -· · · · · ·· · · ッエャゥセ[ᄋキゥウセ ⦅MN ・ョ ァ。ァ ・、 ャョ@ work .at each station;e-xcept in areas
. .. ·
. . - ....
. . . ·:
o , • • • •
., · · · . . ·. ウ ᄋ ー ᄋ セセゥィ N 」セャャケ ZN 」ZエセウLゥァュセエ・セHャ@ 。セ y M pe@ not required .. セ@ .t ;-: . ..
........ . . . ·... . .. .': :.- <:.· .. : ·· \vr·.-.· .... : 」 Z [ Nセ セZ Zセ 」エセイ I |セセセ、 セI ウ セ⦅G ア Nゥ Qィ N カゥウ ゥエセイセ [ [ョHセ セ@ ·,·_ .. .. : ... · :· : ....... ·.. . . < :-' : these-same standa'rds·.' . . . ' . · . .
• :• • '• o: •; o • •: o·. ' ' • •· I • • • ' •• : :' • • o • o •: , ' • • ' ' • . ' • , · • • • •
. .. ·. ·, ·. . (y)··:_. · :· .. Z⦅ ZZcセッ セセ ᄋN ᄋZN セセ ᄋ セセ・ォ・セセゥゥゥᄋァ G Z ᄋZ NM ⦅ᄋ 。Gイゥ・ ᄋ セエウ Nᄋ@ .. ウ N セヲセ」ケN Z[ ᄋ@ · セ G オセiエゥZケ G@ .. セ セセ ᄋ 、 Z@ Z セセッ、オ」エゥッャセセ ᄋ@ ·rt · is エィ セ・MMNNN NNlッMア@·.. · ᄋ Zイ・ Z セ Np qセウゥ「ゥ N ゥゥゥy ᄋセ ッイjZ」_ャQ N エ イゥウ セセ セセゥイ N ・ G@ Z ッ N セ⦅ウゥ エセ Nᄋ@ .. セ イッ@ ᄋN セセK イ@ Nイセ セOセ セ@ ⦅N キ[セZォ@ pi.-ea clean .
.: :·: :.·. ·.:. . : Concessionaire· 。イ・ ᄋ LNエZ・セー ᄋ oGョセゥセ ャ・ M or trash at}d セ・ー、ウ ᄋ@ that is genej'ated by their . · ...
·. ·. ·. ·.· . .. · · キ、ッ N エ Z セ Q Z Z QG「イ。ウNィ Nᄋ 。 セセ@ セセセLイセ N セ@ セ M エセ ウセ@ 「 [ セ ᄋN 」ア ⦅ ゥャ・セエセ M セ@ .. ᄋ セセセ M セ M セ M 。セ ᄋ ・、 Zᄋ ゥ ᄋ セ ᄋ イ セッー ・イ@ 」 N ッョエセゥョ ・ イウ N ッ ヲG|^@ . セZZN@. . · . a at y asts · · ·· · · · .· . · .. · · · · · · · ..
. : .. ·;; :: ... セN Zᄋ ZNZ@ ... ·. <· セZNMZ@ · . NZZ ZᄋNᄋZNZᄋN\ᄋ ZNZZ [ᄋ Zセ ᄋNZᄋZ^ Z Nᄋᄋ ᄋ ᄋZ@ ... ·>::'. ·.· ... :··:·<·: ·.·· ···, . . · ·.:. | |セセ@ ' ,_ セセ@. .. . . fzL .. : -: Trash shall:not. 「・G \Z ヲ。ヲゥ、、ゥZヲャャjNMGセィイッwョ@ ··off a floor· or ,tprough openings in the |||Nゥセセ@ ;:, .
. :: ··._"·. . '· ... ' ·: ·,·, : .. : : ... ョッ HIセᄋ NGt[。 ウィ@ 」ィオ G エ」セHNエャセ。ヲNセ Z セ ᄋ HI N xセsL ᄋ \_Nゥᄋ Z Z ッエセ・セ@ .apr イッカ・セ@ N iョ ・ [ャセ ⦅ ウ@ セ オ」ィ@ 。セ「。 イイゥ 」 。セゥ_ GヲゥBGZ Z@ y|ェセ@ :·3' . .-·, ..... : · . ::· .. : ... ·.:· : · at1d/or ヲャ 。ァァ ゥ ョァ G ウ ィセAゥ 「・ M セエGゥャゥゥ・、Z Z@ ·· . . >-''• · · ... ·· · ·· · :·. · .. ' · · .· · · セ[Z@ ' .. ⦅LNZサセ@ Z Nセェ@
-.... ·, .. ·. . .... . セセセ[ ZZᄋ ᄋ@ ·. ·. [。セセエセ ᄋ イ・ セ オゥ N イ・ョ QセZセ エ セᄋ エゥセ・ョ エゥᄋ セセセ Z 、@ ゥ ᄋ Q セᄋ N エィ セ@ bエQ N カゥイ ッ セセ・ョエ@ ᄋ ゥ N セー。セエ@ ᄋ セウウ・セウュ・ョエ@ (EIA). ·r ᄋ Mセセjセセ@Z rNM・ ーッイエウ ィセ ⦅ ョ@ be セゥ_ セゥーャゥ N 。 ョ」・N@ ·,:.- ·, .. : セ@ · · B
.. : ··:·; , :._: . .. ::. "· .. . . . セ@. . :
. . . . ; ..... · .. セ@ ..
. . .. t セ@ ;.0 • . ·• セ@
. .. . · ... .
• •• o, ••• •
.· .· : · . ... :• ... ·.·
....
·,· <.
. ;
.. , ,• ..
·.f
· · ... ヲセェ@ · The ᄋ 」ッセ」・ウセ ゥッ A セセ セ イ セ ZN@ ウィ N セiゥ@ ウ・ N ゥZBオセ@ a キ ᄋ セャI セ ᄋ セアャゥゥーーセHH@ セセセ M セイォ エッイケ@ for ᄋ ュッョゥエッイゥセァ@· .. ;and セョ ᄋ 。AケウゥウNYH・ョカゥイ」ゥイ|ュ・ イ ゥセ。ャ@ ー。イ。セセ N エ・イウ@ for air ·q\laii.ty, nieteorql0gy, キ。セ・イL@ ·.
. .. · : キ_セエ・キセゥ・セᄋN ᄋZ@ noi.$.e,: . ァイッオイゥ、Gキセエ・セZ[N@ セエ N 」@ · 「セウセ、 N@ on · .. the : ·overall monitoring
.... : .. : ·.. . . : イ・アセゥイ・ュセイゥエ@ .. GIS:giye·n· in b。 ッャセァイッTョ、@ ッ、」セュ・ョエセN@ . . . . . . . . ' . . .. . . . . . : ·. ·. セN@ .
.. · . · : . .. . . . .. . :· ."' · ..
. ·. · ·
. セ@ . : . .
' ·; .
. ,.;:. セZG@ .....
·.: ·\ft!)
·. : ... :. セセ[セセャ ヲゥゥ lセセ セ セ@cセャャlヲMN ゥ|pL luhゥpeGヲ@ i{;i.:;•,t:::'\i"f.'.UTY
.. ' ·
, セZᆪZWセセセ ZセᆬAセSセセC[セセ セC@ .. セセ セ[ZセセセCセセZセ[Lセセ[セMセセZZセセ]セセᄋセᄋセセZセセ ]セ\セ]セNウB LセLNelセZセZ]セZZ@セM ᄋ@ ': •. . . . • :·.:. .• • : .• ! : . • . . . .. . · . ·. . . . . • . . ·• • •. . . .. ' . . • . : . . • ' ... .. . ... ......... . . • "
. . · .... )' .. . •, . ·. '•: .. . ' . . . -- .·: .. :::,. . .. . . .. . ..
.. . . . · · .. . :.
: セ@ . . . . .. •• . . !·
... . ·. :' .· .. . . . · · . . . . .· .. ': .... ·:· _.:._: :' : . . · .
. . . _·,Ch). : -> エィ ᄋ セ Z@ ᄋ 」セョエ ᄋ セ ᄋ セウエ N qィセ ᄋ ゥイセ MG Z ウセセオ ZZ ヲイゥョセカカェゥIᄁ Z@ QA)Qc· ーQ セ ッセセ Z 、オイセウ Z@ ヲッ イ ᄋᄋᄋ セゥエ ᄋ@ Z Qセ「ッイセエッセケ ᄋ⦅@ ·· · -· · . · .. : .. ウ・イセゥセセ ᄋ セ G@ 。ョ、NIエイQカセ ᄋ エッァセエ Z エQ イ ・ N⦅ 」・ゥZエ ⦅ ゥヲj・、 N j。「 ᄋ ッセ。エッセケL@ ウ ᄋ エ。エセウ M ヲゥᄋV ュ N ᄋ アセ。ャゥエケ ᄋ ーッャョエ@ of. f-
. : :·:.· :.-.> .. ·.. . . . . ·· .. ) .: . .. v.iew. s:och_' セ N ウ NZ エウッ ᄋ[Z Yqoo N@ G \ゥG ョ N \Hッエィ・イ NZ Dゥゥョゥャ N セイ@ standards .. The overall-goal.:s.h'otild a: セ@
:·:i _::-- .. . · .f · .. ·.:. : .. :' ': ·. ·.: :- ··.: ·. ·.:.: ·afsq' be::w 。ゥアセイゥ G イ・ Z ゥZィGセ Z ウセ。エセゥ Nᄋ ッゥ N@ ce.i·tified and rec<?gtJ ized :Jab6i·atqr}r ttnder ᄋZᄋᄋᄋ セ。@/' . . .. · . : ,. · moef[ Nᄋ gッカ N セイョュセョエZッヲ@ tndia·: t ィ ・N c ッ ョ」 ・ウウ ゥアョ。 N ゥョ セ@ si1ati strive to get ISO 14001 · . o z
;-:'=. :::·;'··· ·: · · ·• ·: .... . : · .. · , : ... 」・ ᄋ セセゥヲゥ」セエエッ ᄋ ー ᄋ ヲセイエィ・ NG セゥZゥエゥイセ ᄋ ヲ。セゥャゥ ヲケ@ . .'··.·.=.: ·. · . · ·.. . . · ··· ffi. セ@
< .' . ::··-:. : •• .•.• :: .. ': セAI@ ... : .. ·. Gt セ ・ M セ 「ョ」 セ セ ウゥッ セ N 。ゥ イ セN Z セ ィ。 Z ャャ Z ヲセ[ャッセ ᄋᄋ エゥ[ ᄋ セ Z N ・セ Z セゥ[ッョセ・セセ。 ャ@ issues with ュ 。セ 。ァ ・セ・ ャセ@ セ@.. . . .. . . . cktion alo_rig with r.espdnsibili.ti'es a's ュ・セエゥojQ・ 、@ in the folloW.ing table. .. : イZ [ZZ セAGN@ · .. 0 fu .
. ·. .. ·.• .... . . . . . .. . :.·.. . '. ' . . . . . ' . . . ·;\ ''·J ·01 . ... . . . . ...... ··. .. ,,,..... ;!f. ·.·. .··.
· ·· -: ..
: ·>: ·: A·:. . •
::·. セ MM セ@ .
.. _ ... ;_··.·
セ Z@ . ,
Mセ@ · ... · . セ@ ..... ·: ..
セ NZ@ ·· ::.· .·: ··::•. . '·.
e ョカゥイ G ッセイゥエ ᄋ ・イゥエ セ ゥ Z@ ゥウウエゥセウ@ · · . . .. '• . · . . .
".' ,.,
. .....
:-·· . .. • • •• 0
. ' ·. '• ··: ....
.. ---· ·----· -- : ...
'··.
: . . ·. -:··
. :: ᄋ m。ャスセァ・ N ョエセャゥエ N a セ ゥZゥYョ@ .·:·.' .: .. . . : : : .. ᄋセ@ . : . セ@
.. _;., .
· · ·· ·./· . :·,:: [ セ Z ャエヲvゥ セ セセセエヲHョッ ⦅ ョ@ .· ..,. :,::: Z ョNセ セ rッmャjゥゥゥ|、・ N ウ@· . . ··. •··.·. •,,_' ·.. . . .
-Conce.sslonaire
· .. ·-· : .·
Corice·ssionajre
cッョ ᄋ 」セウウゥッョ。ゥイ・@ ..
. . •, .. . . ·· . :
::. :· . . .. ·· -·
lU セM
•·-f\:(
'-<t;l
.. ..
セM . . . ·.· • '(,'
;·:.-:
. ·' ·
.. . , ... ,.
:.-· .. ....
スNセ@;·.·
f'.. I
I ,. I
:·
..
'·
... ... .
·.· · .··· . Air Poiiution·:. .. . ·
· .... . : .. : · ·· ..
·_. fi.igh Ciust i ・ セ・H⦅ ZZ N@ <:: . . . セ@ .
. • sセ」ャゥセ・ N ョ N エ@ runoff.:.::_· .
. f .
Noise pYャャオエゥッ N セ@ ·
I Air pollution· due:tQJhe .MSW
·. vehicles and pAセ」セウセ ゥ ョァ ⦅ ーャ 。 エQ N エウ@--L. . . ..
-
'i • ;
! · .
I'· ;
[: !· (
I· !
· .. ·
. · ..
. . :
[ N セᄋ Z@ ...
• .. :· .
. ... ; .. . · .. ·. · ..
. . . ::. : · ... , >·.· . ...
. ·' : . ··.· ; . ··· .• . . · .. : • ' : . .
' .: .' .. ...
. . ·. セ@ . . . : .. .. . .
セN@ : . . : ' ... ·.' : セ@ . ·.
·: :: 'i4 .. 2:· ウ Z セ」ゥセヲセエセセmセ[セᄃ@ =:, :;:.· .. ;·:·:.
· . . · ·. · . . -:... . '. :.·. ' , , ·: . - . . . : : . . . ; .... .
.... : . . . . .. . _·.··
; , · . .
.· · .·
: , . ·. . , . .::.-:_.· ··. . . . . .. . ·.· . ... . ·. .. . . . . . .. ' . ' ;· . ' セ セ@
· . ·. : ·. (a) . · . . ·The gウュ」・ N ウウゥッョ。ゥセ・@ :shall: ーイッセゥ、セ@ a ᄋ ウ・ー。イ。セ・@ c,lini.c at· the pイッェセ」エ@ Site whe ::- o ·
. ' · · ·,:-: ·. · : N セ・ッ ⦅ ー ᄋ エセ@ \Z M セZiャ Z セLIー ᄋ イ「セセィL@ イVエbイゥスヲャ\ゥヲケゥゥ・。エエィ ᄋ セ。ケゥ」 ᄋ ・ LN N N@ セ@ . .. .. :. ..... . ' . . : . . . . .; . : '.. . . . . . .· ᄋ セ@ .
.. . . . . . :::· · (b! N[Nゥセ・ ᄋ 」。 ᄋ ョセ・ウウゥセョ M セゥOセ@ ᄋ ウャQ Z 。セイイj「ケゥセ N ・ セZ セVセセセョゥエケ@ 。ョ、 M セイ。[ゥョゥョァ@ center キャエィゥャゥセ セ@ ·r: · . . Pro}e_ct ·Site セNカィ・イセ ᄋ ゥョ Z@ ュオャセANpャ・ G@ employmen_ts related capacity building 。ョセNNN@ ;d . :· .: .... .' · .·::· · · · · . tr:aini ng 。」セゥセゥエゥ・ウ@ :sh.al!Ye_ セ M ョNセ・ N イエ。セ\・ョ@ _al1d necess.ary.,'ikills shall be imparted. [⦅G セEゥGセ[@ セ@
. .. . . .. , . .. . . ·:·{¢) .. : _: .. ·. Kセセセ ᄋM ᄋ」V ᄋ [Q」・セ[ゥッセス M セNゥヲセ Z N[ ウゥゥセゥゥ Z@ Z ー ᄋ イYN N セセセMセ Z ⦅MZ セセ@ セ M ュ ⦅ ーャセケュ・ョエ@ Z⦅M セーセッイエセュゥ@ ty based on' 7..Jt. ェセ@" . , .. · .. · ... ··· .
·' : .
· ' · . ·.·· ·training.and. skili. 。 ᄋ ウセ ⦅ セウウョ Q N セセエ ᄋ N@ ⦅ tゥャ ⦅セN@ ᄋセ・ N 」ッ N ョ、。イケ@ e;nploymeut an<;l/or 「オウゥョ M ・ウセ Lセセ エ [セM セ セ@. .:· · ᄋ N ッーーッイセエセョゥエy[@ sh<i.B be. セュ_ヲ・セ@ through M セィ・@ ヲセ」ゥャゥエケ@ ッー・イ。 N セッイ@ or support services . . ' NNLZML セ@ 2. \
. . .. : ., •• •. •• • . • . : t. • ·f-? ᄋ[セセ N@
· :·. · · (d)- .. : The cッイエセ・セウAGッョ。ゥゥセ・@ shall ーイ「 ᄋ セᄋセア・@ エセ。ゥョゥ N ョァ N 。ョ、ᄋ N 。キ。イZセ ᄋ ョ・ウウ@ to labors at plant, セ ゥN セ@wh.icl) ·should.he 。 ᄋ 」ッョGエゥョゥエ。ィウ。」エ ゥ セゥᄋエIイN@ ·. : · · · · · lセ@
.rp
· . . . . . : .. . ... .
· . . ·. .'·t · . : . . - : . .... · : .. ·. セ@. ·'
· ' ., . •, . '·.
ZᄋZN セセ ᄋ | ᄋN@ •· .. ·· · •\. ' '.:.· .. . ,
.... :· · .. · \'
.; j
, , 1' '
. ,
ᄋ セ ᄋ@ ..
. · ...
.,
· . ' ·.
• f セ@ •
;,: ..
. ;
.. ··:.
.. . '•. ..• ·.
.... Zセ@ .
. . . :·
.'.' . ..
•. ' . . · .
: • . •
'; ... ··:.
.. · . • .. ·.·.
. . . . . . . . · .. :: :. . . . . :, セ@ . セ@ セ@ ..... :.. ':·
.· . ··;··· : .. · .- '
. . : .. • .·. '.
•:
·' . ,. :. セZ@ .. : . .; .
. " .. . . •;·
- .. -. . . ·: ; . .
:·• o • I ... ••' .........
',•'
·:.-· •' .. , ..
'• .
. !.
... : .
' · . . :. ·. ·. ...
·.· ._:::.:.· . . M セ@ . :., . . . : :' . :,· .;·
··: · ... : .·',' ... Zセ@
' ::'
.''• .
'! •· .• ..·· ·:
· ... . . . , (,. __ ,:' ;' . ᄋGᄋZNZ ᄋZ セ@ .· ·.: :.' .. .'.; .... . . . ᄋᄋセ@
.· '. . ':..
···:::· ·' . · .•, .. ·.' . :
I :':'
. '.
... " .. . :· . ·· ... ·
···: :,: .·
:.,. '
...
.·_·: : .. . .
. . セN@ .. :· ·. セ@ · .. ·· .. : . ': .. . セ@ . ·.•. ,; . .
. · .. : .
. :· . ·.: .... ': . セM セN@ ,· . ·. : .. ··· .
· ...
....
... ,'(
... ··:
. . · .. ,.
. . .'·
. :; .
... : .
.. '• •,
· . . ·.··. · .. . . . . •;. ··: ...
', ' .. ... .
· ..
-·:· o :' o I
:· . ...
· ... . ·. :: .. : ·.
: . .....
·: ·
., .. ·. ·· ..
. .... . ·· ....
· .. .. ·. ,• : .. ·
.. ·.·.·.·.
.· . ... .
.·. :
',t
·::
:i
Page 1 of 6
CONSENT ORDER FOR ESTABLISHMENT
Order No. 404 /APPCB/CFE/RO-GNT/HO/2016 Dt: 20.03.2017
Sub: APPCB – CFE - M/s. Jindal Urban Waste Management (Guntur) Limited, Sy. Nos. 933 & 938, Kondaveedu (V) Edlapadu (M), Guntur District – Consent for Establishment (CFE) of the Board under Sec.25 of Water (P & C of P) Act, 1974 and Under Sec.21 of Air (P&C of P) Act, 1981 - Issued - Reg.
Ref: 1. Industry’s lr. dt. 18.02.2017 and 20.02.2017. 2. Industry’s revised application received through Single Desk received on
21.02.2017. 3. R.O’s inspection report dt. 01.03.2017. 4. CFE Committee meeting held on 09.03.2017.
1.
In the reference 2nd cited, a revised application was submitted to the Board seeking Consent for Establishment (CFE) for MSW based power plant with installed capacity as mentioned below, with a project cost of 212.905 crores (Rs 212.89 Crores + Rs. 0.015 crore).
S.No Name of the Products and
By-products
Capacity
As per CFE order dt.28.12.2016
As per Revised CFE Application
1 Refused Derived Fuel (RDF) 1068.4 Tonnes/day - 2 Compost 75.7 Tonnes/day - 3 Electricity
(Fuel: MSW-1620 TPD) 15 MWH 15 MWH
By- products 1 Brick and Paver Blocks 20000 Nos/day 20000 Nos/day 2 Iron & Steel (Metal) 0.32 Tons/day 0.32 TPD 3 Chlorinated Hard Plastic 6.5 TPD 6.50 TPD 4 Leachate 48.6 TPD 48.6 TPD
2. As per the application, the above activity is to be located at Sy Nos. 933 & 938, Kondaveedu(V) Edlapadu (M), Guntur District in an area of 62726 Sq. m (15.50 acres).
3. The above site was inspected by the Asst, Environmental Engineer, Regional Office, Guntur,
A.P Pollution Control Board on 27.02.2017 and observed that the site is surrounded by North : Existing Municipal Dump yard
South : Eucalyptus Plantation and hill
East : Existing Municipal Dump yard weigh bridge and Road
West : Hill of Kondaveedu Reserve Forest
4. The Board, after careful scrutiny of the application, verification report of Regional Officer and
recommendations of the CFE Committee, hereby issues CONSENT FOR ESTABLISHMENT to your activity Under Section 25 of Water (Prevention & Control of Pollution) Act 1974 and Section 21 of Air (Prevention & Control of Pollution) Act, 1981 and the rules made there under. This order is issued to produce products as mentioned at para (1) only.
Phone: 23887500
Website :www.appcb.ap.nic.in
ANDHRA PRADESH POLLUTION CONTROL BOARD
PARYAVARAN BHAVAN, A - 3, INDUSTRIAL ESTATE,
SANATHNAGAR, HYDERABAD - 500 018
Single Desk Approval Ref Id : SDPCB008160513
Digitally Signed By B S S Prasad (Member
Secretary\)
Date : 21-Mar-2017 19:44:01 IST
Page 2 of 6
5. This Consent Order now issued is subject to the conditions mentioned in Schedule 'A' and Schedule 'B'.
6. This order is issued from pollution control point of view only. Zoning and other regulations are not considered.
7. This order is valid for period of 7 years from the date of issue. Encl: Schedule ‘A’ Schedule `B'
MEMBER SECRETARY To M/s. Jindal Urban Waste Management (Guntur) Limited, Jindal ITF Center, 28, Shivaji Marg, Delhi Industrial Area, WEST DELHI-110015. vc@jindalecopolis.com Copy to: 1. The JCEE, Z.O., Vijayawada for information and necessary action. 2. The E.E., R.O, Guntur for information and necessary action.
Page 3 of 6
SCHEDULE - A
1. The proponent shall obtain Consents for Operation (CFO) from APPCB, as required Under Sec.25/26 of the Water (P&C of P) Act, 1974 and under sec. 21/22 of the Air (P&C of P) Act, 1981, before commencement of the activity.
2. Compensation is to be paid for any environmental damage caused by it, as fixed by the Collector and District Magistrate as civil liability.
3. Floor washing shall be admitted into the effluent collection system only and shall not be allowed to find their way in storm drains or open areas. The industry shall maintain a good housekeeping. All pipe valves, sewers, drains shall be leak proof. Dyke walls shall be constructed around storage of chemicals.
SCHEDULE – B
Water:
1. The source of water is Guntur Municipal Corporation Sewage Treatment plant and the maximum permitted water consumption is as following:
2. The maximum waste water generation shall not exceed the following:
Treatment & Disposal
Source of effluent Treatment Mode of final disposal Boiler & Cooling tower blow downs, DM re- generation water
Neutralization Used for firefighting system makeup, Brick plant and Domestic.
Floor & road cleaning ---- Mixed with the MSW pits.
Domestic (Plant)
Septic tank soak pits
Leachate (as mentioned in the EMP)
Influent Leachate storage tank; Mesh Screens; Oil & Grease Trap Moving Bed Bio film Reactor; Secondary clarifier; Sump Tank; Carbon filter and Sand Filter; Sludge drying beds.
Re-circulated for ash quenching.
S.No Purpose As per CFE order
dt.28.12.2016 As per Revised CFE Application
a) Cooling tower make-up 201 KLD 332.14 KLD b) Boiler make-up 37.86 KLD 37.86 KLD c) Domestic (Plant) 3.255 KLD (Recycled) 3.255 KLD (Recycled ) d) Process(Bricks plant ) 17.13 KLD (Recycled) 30.0 KLD (Recycled )
e) Washings (Floor & Road washings) 6.975 KLD (Recycled) 6.975 KLD (Recycled)
f) Fire fighting makeup 65.1 KLD (Recycled) 65.1 KLD (Recycled) g) Sludge Thickener 14 KLD 34.0 KLD h) Bottom ash cooling 50 KLD 75.0 KLD i) Green belt development 21 KLD 21.0 KLD Total (Fresh +Recycled) 416.32 KLD 605.33 KLD
Sl. No
Source As per CFE order
dt.28.12.2016
As per Revised CFE Application
a) Cooling tower bleed of and SSF rejects 56.84 KLD 69.71 KLD b) Boiler blow down 21.12 KLD 21.12 KLD c) Domestic (Plant) 3.0 KLD 3.0 KLD d) Washings ( Floor & road washings ) 6.0 KLD 6.0 KLD
e) DM Plant regeneration 14.5 KLD 14.5 KLD Total 101.46 KLD 114.33 KLD
Page 4 of 6
3. The Effluent Treatment Plant (ETP) shall be constructed and commissioned along with the commissioning of the activity. All the units of the ETP shall be impervious to prevent ground water pollution.
4. The effluents generated from the cooling shall be treated to the surface water standards
and domestic waste water shall be treated to the on land for irrigation standards, as stipulated under Schedule VI of Environment (Protection) Rules, 1986, notified by Ministry of Environment and Forests, Government of India vide G.S.R.422 (E), dt.19.05.1993 and its amendments thereof.
5. The proponent shall regularly monitor the ground water quality for mercury and other heavy
metals (Hg, Cr, As, Pb, etc) around the Municipal Solid Waste Landfill including surface water bodies in the vicinity. The monitoring data shall be compared with baseline data and requisite measures shall be implemented to prevent any kind of direct/ indirect contamination of water resources in the project surroundings.
6. Separate meters with necessary pipe-line shall be provided for assessing the quantity of water used for each of the purposes mentioned below.
a) Industrial cooling, boiler feed.
b) Domestic purposes.
c) Processing, whereby water gets polluted and pollutants are easily bio-degradable.
d) Processing, whereby water gets polluted and the pollutants are not easily bio-degradable.
7. The industry shall provide digital flow meters with totalisers at inlet of Leachate treatment system for the purpose of measuring quantity of effluents.
Air:
8. The Air pollution Control equipment shall be installed along with the commissioning of the activity and shall comply with the following for controlling air pollution.
Sl.No Details of Stack Stack-1 Stack-2
a) Attached to: Boilers D.G. Set
b) Capacity 2nos X 48 TPH 1 x 1500 KVA
c) Fuel : Municipal solid waste HSD
d) Stack height above ground (m.) 60 m (RCC Common stack)
15 m
e) Air Pollution Control Equipment: Turbo reactor with lime injection followed by the Bag House with activated carbon
coating bags (For each boiler)
Acoustic enclosures
9. Continuous online monitoring equipment shall be provided for the stack attached to
Boiler for Sox, NOx, PM2.5 and PM10. Data thus generated shall be connected to CPCB and APPCB websites for display as per CPCB directions dt.05.02.2014.
10. Regular monitoring of ground level concentration of SO2, NOx, PM10 & PM2.5 shall be carried out in the impact and buffer zone and records shall be maintained. If at any stage these levels are found to exceed the prescribed limits, requisite restorative measures shall be implemented immediately. The location of the monitoring stations shall be fixed in consultation with the Regional Officer of the Board. Consolidated daily reports shall be submitted to the concerned Regional Officer on monthly basis.
11. The proponent shall ensure compliance of the National Ambient Air quality standards notified by MoEF, GoI vide notification No. GSR 826(E), dated. 16.11.2009 during construction and regular operational phase of the project.
Page 5 of 6
12. The industry shall take following mitigation measures to control fugitive emissions during construction and operational stage: Vehicles shall be managed to avoid traffic congestions and shall provide parking facilities.
Mechanical water sprinkling shall be provided on roads and at dusty construction material
storage areas, for suppression of dust. Mechanized handling equipment shall be used for loading & unloading operations.
Vehicles shall comply with emission standards and shall have valid PUC certification. Procurement of machinery / construction equipment shall be in accordance to the
specifications confirming to source noise levels of 85 dB(A).
13. In plant control measures for dust suppression like black top / concrete roads, Water Sprinkling system shall be provided for controlling fugitive emissions from all vulnerable sources.
14. All the dusty raw materials and solid waste shall be accommodated under roof shed with required safety ventilation as approved by the competent authorities. There shall not by any open piling.
15. A sampling port with removable dummy of not less than 15 cm diameter shall be
provided in the stack at a distance of 8 times the diameter of the stack from the nearest constraint such as bends etc. A platform with suitable ladder shall be provided below 1 meter of sampling port to accommodate three persons with instruments. A 15 AMP 250 V plug point shall be provided on the platform.
16. The generator shall be installed in a closed area with a silencer and suitable noise absorption systems. The ambient noise level shall not exceed 75 dB(A) during day time and 70 dB(A) during night time.
17. The MSW shall be stored in a closed area with a negative pressure with the air flow routed through the boiler to prevent odour as mentioned in the EMP report.
Solid Waste:
18. The proponent shall comply with the following:
S.No. Solid / Hazardous waste Quantity Mode of final disposal a) Used Oil / Waste Lubrication
Oil
0.5 TPA sold out to authorized recyclers /re processors
b)
Boiler Ash Fly ash: 32.5 TPD
used for own Brick manufacturing plant
Bottom Ash: 128.16 TPD
sent to Scientific land fill facility for disposal
c) Used Lead Acid Batteries 4nos/Annum returned to dealers on buy back system
19. Adequate safety measures shall be provided in the plant area to check / minimize spontaneous fires in MSW storage yard, especially during summer season.
20. The proponent shall install silo of capacity (200 tons) with breather bags to collect and store ash and its distribution.
Page 6 of 6
21. The following rules and regulations notified by the MoE&F, GoI shall be implemented.
a) Hazardous waste and other wastes (Management and Transboundary Movement) Rules, 2016.
b) Manufacture, Storage and Import of Hazardous Chemicals Rules, 1989 c) Fly Ash Notification, 2016. d) Batteries (Management & Handling) Rules, 2010. e) E-Waste (Management) Rules, 2016. f) Construction and Demolition waste Management Rules, 2016.
Other Conditions:
22. The CFE order No. 404 /APPCB/CFE/RO-GNT/HO/2016, dt. 28.12.2016 is cancelled.
23. The industry shall comply with the following:
The proponent shall start construction work of the project after obtaining
Authorization under Solid Waste Management Rules, 2016 for establishment of
storage, handling and management of Municipal Solid Waste.
The project proponent is informed to take action as per the provisions of the EIA
Notification, 2006 and its amendments thereof, with regard to the Environmental
Clearance (EC), for the required components.
The order is subject to final orders in the W.P pending in the Hon’ble High Court / NGT.
24. Green belt shall be developed all along the boundary & vacant spaces with tall growing trees with good canopy and it shall not be less than 33% of the total area.
25. The proponent shall ensure that there shall not be any change in the process technology, source & composition of raw materials and scope of working without prior approval from the Board.
26. Concealing the factual data or submission of false information / fabricated data and failure to comply with any of the conditions mentioned in this order may result in withdrawal of this order and attract action under the provisions of relevant pollution control Acts.
27. Notwithstanding anything contained in this conditional consent, the Board hereby reserves its right and power under Sec.27(2) of Water (Prevention and Control of Pollution) Act, 1974 and under Sec.21(4) of Air (Prevention and Control of Pollution) Act, 1981 to revoke in the order, review any or all the conditions imposed herein and to make such alternation as deemed fit and stipulate any additional conditions or revoke the order in the interest of environment protection.
28. Any person aggrieved by an order made by the State Board under Section 25, Section 26, Section 27 of Water Act, 1974 or Section 21 of Air Act, 1981 may within thirty days from the date on which the order is communicated to him, prefer an appeal as per Andhra Pradesh Water Rules, 1976 and Air Rules,1982, to such authority (hereinafter referred to as the Appellate Authority) constituted under Section 28 of Water (Prevention and Control of Pollution)Act,1974 and Section 31 of the Air (Prevention and Control of Pollution) Act, 1981.
MEMBER SECRETARY To M/s. Jindal Urban Waste Management (Guntur) Limited, Jindal ITF Center, 28, Shivaji Marg, Delhi Industrial Area, WEST DELHI-110015. vc@jindalecopolis.com
Government of Andhra Pradesh
A.P. State Disaster Response and Fire Services Department
Provisional Fire No Objection Certificate
To File No: 2408/GNT/MSB/201 8
The General Manager, Date: 07/05/2018
District Industries Centre, Guntur
Sir,Madam,
Sub: Andhra Pradesh State Disaster Response and Fire Services Department - Issue of Provisional No
Objection Certificate for the Proposed Construction ofNon Multi Storeyed Building of(Jindal
Urban Waste Management (Guntur) Limited) Alok Kumar, Sy No, 933 & 938, Kondaveedu
Village, Edlapadu mandal, Guntur District, A.P - Regarding.
Ref: l. Online Application Dt.2610412018 , Alok Kumar, Sy No,933 & 938, Kondaveedu Village,
Edlapadu mandal, Guntur District, A.P
2. Online Inspection Report submitted by Officers ofthis Department on 05/05/2018.
It is to inform that Alok Kumar have applied for Provisional No Objection Certificate on
2610412018 for proposed construction ofNon Multi Storeyed Building for Jindal Urban Waste Management
(Guntur) Limited at Sy No, 933 & 938, Kondaveedu Village, Edlapadu mandal, Guntur District, A.P The
offrcers ofthe department have scrutinized the information, documents and plans submitted by the applicant
along with the undertaking provided by the applicant, and have submitted the following report.
Boiler & Tipping Floor
2. The builder has proposed to construct a Non Multi Storeyed Building with Ground Floor + 2 Upper
Floors with a height of 'l 1.7 Mtrs for Industrial Occupancy (Category - G2) in a total plot area of 62726.27
sq. meters.
3. The builder has proposed open spaces all around the build lng
4' The builder has proposed to provide following means of escape, as per clauses 4.4 .2.4.3.2 and4.4.2.4.3.4, Part - IV NBC 2016
Side
Space Required as
er
.Ms.No.l19(APBR ,
17) of MA & UD Dept
Open Space Proposed by
the Builderemarks
North 4.5 Meters 15.00 Meters -Nit-East 4.5 Meters 15.00 Meters -Nil-
South 4.5 Meters -Nil-West 15.00 Meters -Nil-
etails of Staircases
BC
eters as per
uired Nos / quired
ased on Floo
r€a
roposed Nos
rseficit
Intemal StaircasesMinlNo.-1.5
Meters
I No. - 1.50
Meters.NiI.
2 External StaircasesMinlNo.-1.5
Meters
4 Nos. - 1.50
Meters Each-Nil-
Total2 Nos 0 Meters -Nil-
I
15.00 Meters
4.5 Meters
I
l
I
7.50 MetersJ
5. The builder has proposed to provide Occupant Load as per unit Exit width:
6. The minimum Fire Fighting Installations required as per Table 7 ofPart 4 of National Building Code of
India 2016 are:
7. The builder has proposed to provide the following floorwise Fire Fighting installations as per Table 7 of
Part - 4 0fNBC oflndia 2016.
Provide ABC-
tg/6 t<g lire extinguishers
WetRiser / DownComer - 100mm with single outlet landing valves.
Provide I Yard Hytlerant for every 45 mts of Travel Distance along the Perimeter'
Note 11: Provide required number ofsets ofpumps each consisting of 2 Electric and I Diesel
SI Floor
Built
up area
(sq
Mtrs)
Occupancy
Type
No of
Occupants
as
declared
by the
builder
No of
Occupants
as per
NBC
Aggregate width
of
Staircases/Doors
Required
(Meters)
Aggregate width
of
Staircases/Doors
Proposed(Meters)
Fire
Doors
Fire
LiftDeficit
IGround
floor1683.46 Industrial 7 168 0.07 6 2 -Nil-
2First
floor1781.55 Industrial 7 178 0.07 7.5 2 0 -Nil-
3Second
lloor810.3 lndustrial 7 8l 0.07 6 2 0 -Nil-
Total 4275.31 z1 427
SI Fire Safety System Minimum Required
I Fire Extinguishers 44 Nos.
Z Hose Reel Systems I 0 Nos.
3 Wet fuser 4 Nos (For Each Floor)
4 Yard Hvdrants YH 45
5 Automatic Sprinkler System 358 Nos
6 l2 Nos
7 Automatic Detection & Alarm System 77 Nos.
8 Underground Tank 150000 Ltrs
9 Terrace Tank 20000 Ltrs
l0 Fire Pump Note 1 I
sl. 0rire
xt,
ose et
rYard
HydrantsSprinklers CP
Auto.
Det.
Underground
Tank
Terrace
Tank
re
ump
IGround
floor1'1 4 141 3
2First
floorl8 4 149 5 32
3Second
floor9 2 68 1
Total 44 10
4 Nos
(For
Each
loor
YH_45
Nos.358 t2 77 150000 Ltrs
20000
Ltrs
Note
11
Pump (standby) of capacity 2280 Litres/min and two Etectric Pump of Capacity 180 Litres/min'
I
0
i
I
I
I
I
I
I
I
i Manually Operatetl Electric Fire Alarm System I
I
I I
I
30II
I
I
II
I
II
I
t5I
I
Flue Gas Cleaning System
2. The builder has proposed to construct a Non Multi Storeyed Building with Ground Floor + Ons gppsl
Floor with a height of l0.l Mtrs for Industrial Occupancy (Category - G2) in a total plot area of 62726.27
sq. meters.
3. The builder has proposed open spac€s all around the building
4. The builder has proposed to provide following means of escape, as per clauses 4.4.2.4.3.2 and4.4.2.4.3.4
, Part - IV NBC 2016
4. The builder has proposed to provide following Doorways / Level Components
sl. Description Width (Mtrs) tion
I Exit 2 East
5. The builder has proposed to provide Occupant Load as per r.rnit Exit width:
Side
Open Space Required as
per
GO.Ms.No.119(APBR,
2017) of MA & UD Dept
Open Space Proposed by
the BuilderRemarks
North 4.5 Meters 15.00 Meters -NiI-
East 4.5 Meters 9.00 Meters -Nil-
South 4.5 Meters 15.00 Meters -Nil-
4.5 Meters 15.00 Meters -Nil-
SI Details of Staircases
Required Nos /
Meters as per
NBC
Required
based on Floor
Area
Proposed Nos /
MetersDeficit
2 Internal StaircasesMin I No. - 1.5
Meters
0 No. - NaN
Meters-Nil-
3 Extemal StaircasesMinlNo.-1.5
Meters
2 Nos. - 1.50
Meters Each-Nil-
Total I Nos. 0 Metcrs NaN Meters -Nil-
oor
trs)
uilt
p
reaupan
eclared
uilder
the
oofccupan
BC
oof
per
pants
ggregate width
aircases/Doors
f
eters)
uired
regate width
taircases/Doors
roposed(Meters
oors
tre
lteficit
lfloor
250 Industrial 3 252 -Nil-
2First
FloorIndustrial 3 25 J 2 0 -Nil-
Total 6 50
fjl;f,T,;J: aire Fighting Installations required as per Table 7 of part 4 of Nationat Building Code of
re Safety Systemlntmum Required
I Fire Extinguishers6 Nos
2 Hose Reel Systems
3 riutoma C S n k CIprr temSys42 Nos
West
I
II
Ii
iFire
I
0.03 2 0I
2500.03
500
l
2 Nos.l
SI Fire Safety System Minimum Required
Terracc Tank 20000 Ltrs
5 Booster Pump 9OO LPM
7. The builder has proposed to provide the following floorwise Fire Fighting installations as per Table 7 ofPart - 4 ofNBC oflndia 2016.
SI Floor Fire Ext, Hose Reel Sprinklers Terrace Tank Booster Pump
Ground
tloor3 I 2l
2 First Floor 3 1 2t
Total 6 2 20000 Ltrs 9OO LPM
. Provide ABC 5 kg/6 kg fire extinguishers
Canteen, Stores & Cement Godown
2. The builder has proposed to construct a Non Multi Storeyed Building with Ground Floor with a height of4.5 Mtrs for Industrial Occupancy (Category - G2) in a total plot area of 62726.27 sq. meters.
3. The builder has proposed open spaces all around the building
SideOpen Space Proposed by
the BuilderRemarks
North 4.5 Meters 9.00 Meters -Nit-
East 4.5 Meters 9.00 Meters -Nit-
South -Nil-
West 4.5 Meters 12.00 Meters -Nit-
4. The builder has proposed to provide following means of escape, as per clauses 4.4.2.4.3.2 and 4.4.2.4.3.4
. Part - IV NBC 2016
4. The builder has proposed to provt de tbllowing DoorwaY s / Level ComPonents
citroposed Nos
ased on Floor
uired
BC
t€rs as per
uired Nos /
etails of Staircases
-Nil-0 No. - NaN
Meters
Min I No. - 1.5
MetersJ Intemal Staircases
-Ni1-0 No. - NaN
Meters
MinlNo.-1.5Meters
External Staircases
NaN Meters0 Meters0 Nos.Total
tionth (Mtrs)riptionIEast2
Exits from Stores, Cement GodownISouth2tn GodownCemeSm torestS tioEx2North2
Exit from CanteenJ
5. The buitder has proposed to provide Occupant Load as per unit Exit width:
4l
,lI
42
ppen Space Reeuired as
lr"'Go.rrts.No.ltg(lpeR ,I
12017) of MA & UD Dept
4.5 Meters | 15.00 M.ters I
II
4
-Nil-
SI Floor
Built
up
area
(sq
Mtrs)
Occupancy
Type
No of
Occupants
as
declared
by the
builder
No of
Occupants
as per
NBC
Aggregate width
of
Staircases/Doors
Required
(Meters)
Aggregate width
of
Staircases/Doors
Proposed(Meters)
Fire
Doors
Fire
LiftDeficit
1
Ground
Floor63 8.9 tndustrial 20 63 0.2 6 2 0 -Nil-
Total 638.9 20 63
SI Fire Safety System Minimum Required
I Fire Extinguishers 7 Nos.
Hose Reel Systems 2 Nos.
3 Down Comer 2 Nos (For Each Floor)
4 Automatic Sprinkler System 54 Nos.
5 Manually Operated Electric Fire Alarm System 3 Nos.
6 Automatic Detection & Alarm System l2 Nos.
1 Terrace Tank 50000 Ltrs
8 Booster Pump 9OO LPM
6. The minimum Fire Fighting Installations required as per Table 7 of Part 4 of National Building Code of
India 2016 are:
. Provide ABC 5 kg/6 kg fire extinguishers
. WetRiser / DownComer - l00mm with single outlet landing valves,
Office
2. The builder has proposed to construct a Non Multi Storeyed Building with Ground Floor with a height of
3 Mtrs for Industrial Occupancy (Category - G2) in a total plot area of 62726.27 sq. meters.
3. The builder has proposed open spaces all around the building
Side
Open Space Required as
per
GO.Ms.No.119(APBR,
2017) of MA & UD Dept
Open Space Proposed by
the BuilderRemarks
North 4.5 Meters 5.60 Meters -Nil-
East 4.5 Meters -Nil-
South 4.5 Meters 12.00 Meters -Nil-
West 4.5 Meters I 2.00 Meters -Nit-
4. The builder has proposed to provide following means of escape, as per clauses 4.4.2.4.3.2 and 4.4.2.4.3.4
, Part - IV NBC 2016
st. FloorFire
Ext.
llose
ReelDown Comer Sprinklers MCP
Auto.
Det.
Terrace
Tank
Booster
Pump
Ground
Floor7 54 3 t2
Total 7 22 Nos (For Each
Floor)54 3 l2 50000 Ltrs 9OO LPM
I
I I
2I
!
I
I
,l 2I
7. The builder has proposed to provide the following floorwise Fire Fighting installations as per Table 7 of
Part - 4 ofNBC of India 2016.
9.00 Meters i
SI Details of Staircases
Required Nos /
Meters as per
NBC
Required
based on Floor
Area
Proposed Nos /
MetersDeficit
4 Internal Staircases0 No. - NaN
Meters-Nil-
5 External StaircasesMin I No. - 1.5
Meters
0 No. - NaN
Meters-Ni1-
Total 0 Nos. 0 Meters NaN Meters -Nil-
4. The builder has proposed to provide following Doorways / Level Components
st. Description Width (Mtrs) Location
I Exit - I 2 West
2 Exir - z 2 East
5. The builder has proposed to provide Occupant Load as per unit Exit width
6. The minimum Fire Fighting Installations required as per Table 7 of Part 4 ofNational Building Code of
India 2016 are:
7. The builder has proposed to provide the following floorwise Fire Fighting installations as per Table 7 of
Part - 4 ofNBC oflndia 2016.
. Provide ABC 5 kg/6 kg fire extinguishers
Power House
2. The builder has proposed to construct a Non Multi Storeyed Building with Ground Floor + 2 Upper
Floors with a height of 8 Mtrs for Industrial Occupancy (Category - G2) in a total plot zrea of 62726.27 sq.
meters.
3. The builder has proposed open spaces all around the building
SI Floor
Built
up
area
(sq
Mtrs)
Occupancy
Type
No of
Occupants
as
declared
by the
builder
No of
Occupants
as per
NBC
Aggregate width
of
Staircases/Doors
Required
(Meters)
Aggregate width
of
Staircases/Doors
Proposed(Meters)
Fire
Doors
Fire
LiftDeficit
I
Ground
floorl l1.16 Industrial l1 0.1 4 2 0 -Nil-
Total IIt.t6 ll
SI Fire Safety System Minimum Required
I Fire Extinguishers 2 Nos
2 Hose Reel Svstems I Nos.
3 Terrace Tank 20000 Ltrs
4 Booster Pump 9OO LPM
SI Floor Fire Ext. Hose Reel Terrace Tank Booster Pump
2 I
Total 2 I 20000 Ltrs 9OO LPM
lMinlNo.-1.51| ,.,... I
10
l0
I
, I crouna
I
| floor I
I
Side
Open Space Required as
per
GO.Ms.No.1l9(APBR,
20rf of MA & UD Dept
Open Space Proposed by
the BuilderRemarks
North -Nit-
East -Nit-
South -Nil-
West 4.5 Meters 7.00 Meters -Nil-
SI Details of Staircases
Required Nos /
Meters as per
NBC
Required
based on Floor
Area
Proposed Nos /
MetersDeficit
5 Internal StaircasesMinlNo.-1.5
Meters
I No. - 1.50
Meters-Nil-
6 Extemal StaircasesMinlNo.-1.5
Meters
I No. - 1.50
Meters-Nil-
Total 2 Nos 0 Meters 3.00 Meters
4. The builder has proposed to provide following means of escape, as per clauses 4.4.2.4.3.2 and 4.4.2.4.3.4
, Part - IV NBC 2016
5. The builder has proposed to provide Occupant Load as per unit Exit width:
6. The minimum Fire Fighting Installations required as per Table 7 ofPart 4 ofNational Building Code ofIndia 2016 are:
7. The builder has proposed to provide the following floorwise Fire Fighting installations as per Table 7 ofPart - 4 ofNBC oflndia 2016.
SI Floor
Built
up
area
(sq
Mtrs)
Occupancy
Type
No of
Occupants
as
declared
by the
builder
No of
Occupants
as per
NBC
Aggregate width
of
Staircases/Doors
Required
(Meters)
Aggregate width
of
Staircases/Doors
Proposed(Meters)
Fire
Doors
Fire
LiftDelicit
IGround
Floor896 Industrial 7 89 0.07 4 2 0 -Nil-
2 First 824 Industrial 7 82 0.07 3 2 0 -Nil-
3 Second 824 Industrial 7 82 0.07 3 2 0 -Nil-
Total
SI Fire Safety System Minimum Required
I Fire Extinguishers 27 Nos
2 Hose Reel Systems 6 Nos
3
4
Down Comer 2 Nos (For Each Floor)
Automatic Sprinkler System 213 Nos.
5 Manually Operated Electric Fire Alarm System
6 Automatic Detection & Alarm System 46 Nos.'7
Terrace Tank 50000 Ltrs
st. Floor Fire Ext. Hose Reel Down Comer Sprinklers MCP Auto. Det, Terrace TankGround
Floor9 2 75 2 l6
4.5 Meters | 12.00 Meters
4.5 Meters | 12.00 Meters
4.5 Meters | 12.00 MetersI
II
-Nil-
I
8544 2tlznl
6 Nos.
,l
st. Floor Fire Ext, Ilose Reel Down Comer Sprinklers MCP Auto. Det. Terrace Tank
2 First 9 2 69 l5
3 69 2 15
Total 27 6 2 Nos (For Each Floor) 213 6 46 50000 Ltrs
. Provide ABC 5 kg/6 kg fire extinguishers
. WetRiser / DownComer - 100mm with single outlet landing valves.
Air Cooled Condenser
2. The builder has proposed to construct a Non Multi Storeyed Building with Ground Floor + 2 Upper
Floors with a height of l3 Mtrs for Industrial Occupancy (Category - G2) in a total plot area of 62726.27 sq.
meters.
3. The builder has proposed open spaces all around the building
4. The builder has proposed to provide following means of escape, as per clauses 4.4.2.4.3.2 and4.4.2.4.3.4
, Part - IV NBC 2016
5. The builder has proposed to provide Occupant Load as per unit Exit width:
6. The minimum Fire Fighting Installations required as per Table 7 ofPart 4 ofNational Building Code of
India 2016 are:
Side
Open Space Required as
per
GO.Ms.No.1l9(APBR,
2017) of MA & UD Dept
Open Space Proposed by
the BuilderRemarks
North 7.50 Meters -Nil-
East 4.5 Meters 7.50 Meters -Nil-
South 4.5 Meters 7.50 Meters -Nit-
West 4.5 Meters 7.50 Meters
SI Details of Staircases
Required Nos /
Meters as per
NBC
Required
based on Floor
Area
Proposed Nos /
MetersDelicit
6 Intemal StaircasesI No. - 1.50
Meters-Nil-
7 Extemal StaircasesMinlNo.-1.5
Meters
I No. - 1.50
Meters-Nil-
Total -Nil-
S I Floor
Built
up
area
(sq
Mtrs)
0ccupancy
Type
No of
C)ccupants
ts
declared
by the
builder
No of
Occupants
as per
NBC
Aggregate width
of
Staircases/Doors
Required
(Meters)
Aggregate width
of
Staircases/Doors
Proposed(Meters)
Fire
Doors
Fire
LiftDeficit
I Ground 78 Industrial 2 7 0.02 4 2 0 -Nit-
2 First 78 Industrial 2,7
0.02 3 0 -Nil-
3 Second 78 Industrial 2 1 0.02 3 2 0 -NiI.
Total 6 2l
nimum Requiredire Safety System
2
Second i 9 I 2 II
i
I
4.5 Meters I
-Nil-
lnairttto.-t.sl
I M",... I
I lNos. | 0 Meters 3.00 Meters
I
I
2
I
234
SI Fire Safety System Minimum Required
I Fire Extinguishers 3 Nos.
2 Hose Reel Svstems 3 Nos.
3 Terrace Tank 10000 Ltrs
I Booster Pump 9OO LPM
sl. Floor Fire Ext, Hose Reel Terrace Tank Booster Pump
I Ground I 1
2 First I I
3 Second I 1
Total ., 10000 Ltrs 9OO LPM
7. The builder has proposed to provide the following floorwise Fire Fighting installations as per Table 7 of
Part - 4 ofNBC of India 2016.
. Provide ABC 5 kg/6 kg fire extinguishers
8. The Officers of the department have recommended to issue The Provisional No Objection Certificate for
the proposed construction of Non MSB Industrial Building (G2) belonging to Alok Kumar Sy No' 933 &
938, Kondaveedu Village, Edlapadu mandal, Guntur District, A.P, subject to the following conditions.
l. The permission accorded doesn't confer any ownership rights. If it is found that the information
furnished is false and fabricated, the permission will be revoked at any stage and the applicant will
be liable for criminal prosecution as per IPC.
2. This permission is given based on the information, documents and drawings provided by the
applicant. The applicant confirms that the information provided and the documents and drawings
submitted electronically are correct. The final approvals of proceedings are subjected to verification
of documents by concerned ofiicial including site visit. Any deviation noticed will lead to
cancellation of NOC.
3. Prior approval should be obtained separately for any change of nature of occupancy or change of
number offloors or area.
4. Structural safety shall be the responsibility of the Owner / Builder / Developer / Architect or
Engineer.
5. Provide one entry and one exit to the premises with minimum width of 4.5 mts and height clearance
of 5.0 mtrs.
6. Provide diesel generator ofrequired capacity as alternate source ofelectric supply.
7. Provide emergency lighting in corridors, common passages and staircases.
8. The occupant load and occupants per unit exit width and minimum travel distance for occupancy
shall be as per clause 4.3 (Table 3), clauses 4.4.2.1, Table 4 Capacity factors, Clauses
4.4.2.1,4.4.2.3(c), 4.4.2.4.2(a) and Table 5 Clauses 4.4.2.1, 4.4.2.2, of part 4-NBC 2016
9. The building shall be suitably compartmented so that fire/smoke remain confined to the area where
fire incident has occurred and does not spread to the remaining parts of the building as per clause
4.5 Part 4 ofNational Building Code of India 2016.
10. Openings in any separating walls in any floor shall be limited to 5.6 meters in area with maximum
height of 2.75 meters. Every wall opening shall be protected with Fire resisting doors having fire
rating of not less than 2 hrs. All openings in the floors shall be protected by vertical enclosures
extending above and below such openings, the wall of such enclosures having a fire resistance ofnot less than 2 hrs and all openings there in being protected with a fire resisting assembly Strictly
Complying with 15:3614 Part-I 1966 and Clause 3.4.5 ofNBC 2016, Part 4. Fire doors should be
provided in each floor.
I
3
I
11. Illumination of means of Exit in Staircases and Corridors shall be provided with DG Set Electrical
Power as per Clause 3.4.7 ofPart 4 ofNBC of lndia 2016.
12. Smoke Venting facilities for safe use of exits shall be provided as per clause 3.4.8,4.4.2.5 & 4.6
Part JV ofNBC 2016. Emergency Power Supply shall be provided for smoke venting equipment
with DG Supply-
13. All Fire Safety Systems shall be provided as per the provisions of Part -4 ofNBC oflndia 2016
14. Levelled hard open spaces as mentioned in the Provisional NOC including 7 meters drive way all
around the building for operation of fire vehicles shall be provided.
15. Fire doors with 2 hrs Fire Resistance shall be provided at appropriate places along the escape route
and particularly at the entrance to the lift lobby, corridors and staircases.
16. Ventilation of Staircases shall comply with Clause 4.4.2.5,4.6 of Part 4 of NBC 2016.
17. No Hazardous materials such as Petroleum products, explosives, chemicals etc should be stored on
any floor of the building.
The builder is hereby advised to follow the conditions mentioned below while applying for
Occupancy NOC :
1. Clause 6.1.2, NBC-PART-IV-2016: Additional Precautions
a) Flammable liquids for household purposes shall be kept in tightly stopper or sealed
containers. For the limits of quantities of flammable liquids to be allowed in various
occupancies, reference may be made to appropriate regulations.
b) No stove or combustion heater shall be located directly under or immediately at the foot ofstair or otherwise so located as to block escape in case of malfunctioning of the stove or
heater
c)All kitchen exhaust fans, where provided shall be fixed to an outside wall or to a duct of
non-combustible material , which leads directly to the outside. The ducts shall not pass
through ares having combustible materials . However, in case of centralized ducting, the dict
shall be provided with adequate protection to limit the spread offire.
d) Stores, engineering workshops, areas of high hazud etc used for storage of substantial
amount of flammable liquids be of 120 min fire resistance rating wall. Such areas shall be
provided with fire doors , to be kept closed and shall be posted with a sign on each side ofthe
door in 25 mm high block letters stating Fire Doors _ Keep Closed.
2. ANNEX-D,_pe!t:Iy, NBC-2016
i. D-3 DRILLS
. D-3.1 Fire drills shall be conducted, in accordance with the fire safety plan, at
least once every three months for building during the first two years. thereafter,
fire drills shall be conducted at least once every six months.
. D-3.2 All occupants of the building shall participate in the fire drill. However,
occupants of the building, other than building service employees are not
required to leave the floor or use the exits during the drill.
. D-3.3 A written record of such drill shall be kept on the premises for a three
years period and shall be readily available for tire brigade inspection'
ii. D-4 SIGNS AND PLANS
. D4. I Signs at lift Landings A sign shall be posted and maintained in a
conspicuous place on every floor at or near lift landing in accordance with the
requirements, indicating that in case of fire, occupants shall use the unless
instructed otherwise. The sigh shall contain a diagram showing the location of
the stairways except that such diagram may be omitted, provide signs
containing such diagram are posted in conspicuous places on the respective
floor.
iii, D-5 FIRE SAFETY PLAN
. D-5.1 A Format for the fire safety plan shall be as given in D-9.10.
. D-5.2 The applicable parts of the approved fire safety plan shall be distributed
to all tenants of the building by the building management when the fire safety
plan has been approved by the fire Authority.
. D-5.3 The applicable parts of the approved fire safety plan shall the be
distributed by the tenants to all their employees and by the building
management to all their building employees.
. D-5.4 In the event there are changes fiom conditions existing at the time the fire
safety plan for the building was approved. and the changes are such so as to
require amending the fire safety plan. within 30 days after such changes an
amended fire safety plan shall be submitted to the fire brigade for approval.
iv. D-6 FIRE COMMANDS CENTRE
. A Fire Command Center shall be established in the building.
9. The following deficiencies are identified by the ofiicers of the department and needs to be attended to by
the management.
1. This NoC is issued from fire safety point of view only basin8 on
recommendation of the inspection committeer Guntur, 2. This NoC is not fon
claiming propnietary or ownership rights. Funther, in case of any deviation
noticed with nespect to this Noc after issuance of this Noc, the same Noc shallbe liable for cancellation at any time.
3. BoiIers, stones, canteen and office buil.dings, there is no requirement ofstaircases, But, open spaces around the buildinBs shaIl not be less than 4.5
Mtrs.,. Yard Hydrants shall be pnovided. Common pump house of not less than 1620
LPM capacity of one electrical, one diesel and 180 LPM capacity of jockey pump
shall be provided,
10. This Provisional No Objection Certificate is issued with the advice that the Non Multi Storeyed Building
should not be occupied and the operations shall not be commenced without obtaining No Objection
Certificate for Occupancy from this Department about the satisfactory installation of above fire safety
measures.
Your Sincerely,
Regional Fire Office r1llililriltiltilrililililtffi iltilililtilrffi tilrililililffi rffi tffi tiltf
2408/GNT/N5B/2018
1r
Andhra Pradesh, Vijayawada
Copy to Alok Kumar, Jindal Urban Waste Management (Gr.rntur) Ltd, Sy.No- 933, 938, Kondaveedu (V),
Edlapadu (M), Guntur (Dt), A.P
Copy to Chief Office for Record Purpose
Copy to District Fire Officer Concerned
Copy to Assistant District Fire Officer Concerned
Copy to Station Fire Officer Concemed
22.05.18
JINDAL URBAN WASTE MANAGEMENT WASTE TO ENERGY PLANT (15MW)
Next
GNT-WTE-PLB-01
1
Scale
-
Size
Sh.- -
Appd.
Chkd.
Date
Drawn
Design
Rev.
0
(GUNTUR) LTD. (A.P.)
K.S.KPLANT LAYOUT WITH BUFFER ZONE AREA
TITLE:PRASAD
M.V.CHARY
R O A DR O A D
933
R O A D
19200
42150
32120
44130
174120
4370
32140
17170
9830
9750
139090
153640
B1
B2
B3
B4
TREATED
WATER
GUARD ROOM
WE
IGH
BR
IDG
E10m
x 3
m
WE
IGH
BR
IDG
E10m
x 3
m
CONTROL ROOM
GUARD
WATER
STORAGE
TREATMENT PLANT
TEMPLE
ROOM
WATER
FIRE WATERTANK
FIRE &
WATER
P.H.
STORAGE
TRUCK PARKING AREA
RESTROOM
X+416.600
Y+238.815
Sto
rm D
rain
Wate
r
X+20.780Y+278.781
X+22.242Y+141.438
X+416.600Y+57.620
181630
25690
41210
181450
RAW
AUXILIARY COOLING TOWER
X+139.00Y+220.00
(+)63.00
ST
OR
E R
OO
M
ST
OR
E
OPEN STORAGE AREA
X+179.000Y+147.000
X+169.000Y+167.000
(+)60.50
FFL
& SWITCHYARD
17360
X+373.500Y+256.500
R O A D
RAIN WATERHARVESTING
(+)5
9.3
0
Storm Drain Water
Sto
rm D
rain
Wate
r
Sto
rm D
rain
Wate
r
(+)6
0.3
RA
MP
RA
MP
RAMP
6m
WID
E R
OA
D
6m
WID
E R
OA
D
6m WIDE ROAD
6m
WID
E R
OA
D
6m WIDE ROAD
Y+203.000
Y+249.000
X+
305.0
00
X+
359.0
00
(+)60.30
(+)59.30
SLOPE
(+)63.00
(+)59.00
FGL
TO NATURAL DRAIN
6m
WID
E R
OA
D
6m
WID
E R
OA
D
X+
130.0
00
X+
185.0
00
6m
WID
E R
OA
D
X+
404.5
00
Y+226.0006m WIDE ROAD
(+)59.30(+)59.30
6m
WID
E R
OA
D
SLOPE
Y+86.500
(+)60.00
FGL
(+)6
0.3
0
SLOPE
X+
44.0
00
(+)59.50
FFL
TG BUILDING
6m WIDE ROAD
Y+249.000
6m WIDE ROAD
10000
IL=59.5
17
10000
(+)60.5
(+)60.30
(+)63.00
(+)60.30
(+)60.30
(+)60.30
(+)60.30
(+)6
0.3
0
SLOPE
(+)59.30
SLOPE
(+)59.30
SLO
PE
SLO
PE
SLO
PE
(+)60.30
(+)59.30
(+)59.30
GATE 7M WIDE FOR LIGHT VEHICLE
GATE 15 m WIDE FOR TRUCK ENTRY
WATER LINE FROM STPWITH
TOILET
POWER EVACUATION LINE
Y+239.000
X+291.000Y+211.425
11KV/33KV TRANSFORMER
(+)59.00
FGL
(+)59.00
FGL
AIR COOLED CONDENSER
ST
(+)60.00
FGL
(+)60.8
CEMENTGODOWN10 m x 10 m
SU
MP
FO
RC
UB
ES
CU
RIN
G
1
10
11
12
13
14
17
18
19
20
PARKING SHED
D
Verandah
TOILETSSEPTICTANK
OFFICE-1 OFFICE-2 OFFICE-3
TRUCK
X+
359.0
00
6m
WID
E R
OA
D
FGL
D
V
WA
SH
BA
SIN
WA
SH
BA
SIN
CIV
IL
QC
LA
B5m
x 4
m
2m x 3m
12
12
L
(+)69.5
FLOOR
TIPPING
6m
WID
E R
OA
D
X+
267.5
00
CHIMNEY
FUTURE EXTENSION
1
(+)61.30
STORAGE PIT
BOILER FEED (+)82.50
C OF BOILER
intermittent blow down flash tank
GUARD
FLAP GATE
STOPPER
RAIL
EOT CRANE 15TWITH GRAB
HOPPER#2FUTURE
HOPPER#1
EOT CRANE 15TWITH GRAB
GRAB MAINTENANCE
#2
C OF BOILER#1
6
6
7
8
9
X+255.000Y+208.500
X+216.360Y+236.900
13000
13000
X+263.000Y+243.425
X+273.000Y+222.700
2
3
4
5
6
7
8
9
10
11
8000
6000
6000
7000
7000
6000
6000
7000
7000
8000
ABCDEFGHJKLMN
8000
8000
5375
6000
6000
5375
7550
2325
6300
7200
4500
5000
2
5
5
DM WATER STORAGE15
BO
ILE
R F
EE
D
PU
MP
AR
EA
X+329.550Y+122.400
X+299.250Y+190.400
(+)69.5
(+)59.00FGLFGL
(+)56.50(PIT BOTTOM)
(+)59.50
FFL
(+)69.5
COMPRESSOR , RO ,DM UNIT
FFL (+) 59.50
AT GROUND FLOOR
9
MA
TE
RIA
L R
EC
OV
ER
Y
4
SLO
PE
1:1
1
FLUE GAS
SCRUBBER-2BAGFILTER-2
SCRUBBER-1
BAGFILTER-1
LIME BULKER
ID FAN-2
ID FAN-1
INLET
FLUE GASINLET
VFD PANEL (ID FAN)
Panel Room
MCC & VFD PANEL LOAD CELLCONTROLLER
ES/OSPLC
Cable Trench1500X1500
Cable Trench1500X1500
59.500(F.F.L.)
D
BC-9
X+237.60Y+180.70
X+273.92Y+149.40
X+231.64Y+162.40
SUMP
Cement godown
200 CUM
(10M x 10M x 2M)
DG Foundtion
WATER SUMP
BORE WELL
Batching plant (at Present)
BORE WELL
(at present)
GUEST
HOUSE
IL=59.5
17
Rock
Rock
Rock
SLOPE
SLOPE
SLOPE
Rock
Rock
RockRock
Rock
Rock
CEEKAY OFFICE
GODOWN CEEKAY
Toilets
Rock
LDOTANK
LEACHATE TREATMENT
PLANT
1
2
3
4
5
6
(+)5
595
(+)8
000
AB
DE
C
2500
C OFALTERNATOR
C OF TUR.LEXHAUST
C O
F T
UR
BIN
EL
L
(+)8
000TOG.
C O
F A
LT
ER
NA
TO
RL
(±)0.00(±)0.00
VV
AU
X.T
RA
NS
FO
RM
ER
S
FUTURE
16
SW
ITC
H Y
AR
D
Pannel s
hed
DG SET
6 m
x 1
0 m
MC
C L
T P
AN
EL
AP
FC
P
AN
EL
6 m x 4 m
FREEZER
S.S. SINKGas Stove
Wate
r coole
r
DO
OR
Pro
jecto
r scre
en
WINDOW
DOOR
EXHAUST FAN
WIN
DO
W
WINDOW
DOOR
EXHAUST FAN
FA
CIL
ITY
DP STRUCTURE
BC-1
BC-2
BC-3
BC-5
BC-6
BC-7
BC-8
SHREDDERFUTURE
SEPARATOR
BALLISTIC
SEPARATOR
BALLISTIC
FUTURESHREDDER
#1
#1
9479
87.1 mtr
87.7 mtr
48.4
mtr
43 m
tr
284.8 mtr
68.1
mtr
69.6
mtr
99.6 mtr
299.3 mtr
282. 6 mtr
108.5 mtr
MSW PITCORE
ACTIVITYAREA
SLF LAND
AGRICULTURE LAND
NO HABITATION
RE
SE
RV
E F
OR
ES
T
NO HABITATION
OPEN FIELDS
Habitation
Distance
600 mtr
From Core
Activity Area
Page 1 of 9
essor
Sf CON D PART.
1.13 ee
,
1 1 ill z [i it)
)4 WOLliiC,LMY 3.11;Al u t ql ANDHRA PRADESH
0 \\\1.s. . - IPate:ikk:‘ It3c*.-' 1 1 jut 2018
r •u,_,1100 )
1 t
r Whom:-SIA • ;i 3-7 ,4e,A11- ?mo'Se t\y ,
LAND LEASE AGREEMENT
its DEED OF LEASE AGREEMENT is made on 19 th day of JULY in the Year 2018.
3
BETWEEN
CAJNTUR MUNICIPAL CORPORATION, established under the Urban development Authority Act 1974
(Government of Andhra Pradesh) and having its registered office at Guntur Municipal corporation
*resented by SHRI. SRIKESH. B. LATKHAR, S/0 BALAJI LATKHAR, aged about 34 years, the
Commissioner Guntur Municipal Corporation (herein after referred to as "Lessor", which expression
shall, unless repugnant to the context or meaning thereof, mean and include its successors and
assigns) of the ONE PART. (Authorized to execute the land lease agreement as per orders of the
qp(lector and District Magistrate Guntur in 11.Dis.No.4426/2007 -E1 Dated 06-02-2018). A DHAI2
$953 3302. 35 -4-5 AND
M/S. JINDAL URBAN WASTE MANAGEMENT (GUNTUR) LIMITED, a company incorporated under
tie Companies Act, 1956 /2013 and having its registered office at A-1,UPSIDC INDUSTRIAL
AREA,NANDGAON ROAD, KOSI KALANDIST, MATHURA (UTTAR PRADESH)-281403 represented by
itib authorized officer, Shri. MUNDURU VEERACHARY, Sio. Shri. M. NARASIMHARAO, (Aadhar
No.:7271 7097 4294) aged about 52 years, the President (AP Projects) of the Company. (Herein
after referred to as "Lessee", which expression shall, unless repugnant to the context or meaning
thereof, mean and include its associate /group companies, successors and permitted assigns) of the
Presentation Endorsement: Presented in the Office of the Joint Sub-Registrar, Phirangipuram along with the Photographs & Thumb Impressions as required Under Section 32-A of Registration Act,
1908 and fee of Rs. 6500/- paid between the hours of 1/4-\ and ix ~ on
the 20th day f JUL, 2018 20th day of JUL, 2018 20th day of JUL, 2018 by Sri Srikesh
B Latkhar Execution
admitte by (Defaili of all Executants/Claimants under Sec 32A):
SNo-cd It b b Igoe s 61011 Photo Aadhar Photo Address
Signature/Ink
Thumb Impression
1-LE
MUNDURU VEERACHARY[ R)MIS JINDAL
URBAN WASTE MANAGEMENT
NO IMAGEII (G_NTUR ) LIMITED
MUNTATTM VEERACHARY R S
[72. , I , 2018-2580] FOUND
LATHKAR SHRIKESH[RIG
UNTUR MUNICIPAL CORPORATIO
N
Generated On:20/07/2018 04:58:11 PM
REPRESENT
JMD LORD'S, FLAT NO-204,BHARATHI
NAGAR 7 ROAD,VIJAYA WADA(MCORP)
(PART), VIJAYAWADA( URBAN),KRISH
NA
iN0 IMAGE
FOUND
CHAKRAPANI SAKALA[R]GU
NTUR /1 MUNICIPAL CORPORATI
N
REP,.A
ESENT
YARA RAGHAVAIAH
NAIDU STREET,VIJAY
AWADA (URBAN), VIJAYAWADA (URBAN),KRIS
HNA
7
2-LR
CHAKRAFANI SAKALtuliimUNTUR I
(726.1-2018-2500)
/e/ LATHKAR SNRIKESH R GUNTU
t... , [726-1-2018-25801
3-LIZ
NO IMAGE
FOUND REPRESENT
JOINT
COLLECTOR BUNGALOW,C
ONTONMENT,V
IZIANAGARAM(
MOG), VIZIANAGARA
M,VIZIANAGAR
The Seal of
o(uf Sof#1,,egIstra
Office Phirangipuram
46•
Whereas the Guntur Municipal Corporation an Urban Local Body (ULB) and surrounding 08 urban
local bodies including Vijayawada Municipal corporation and 07 Municipal Councils viz, 1) Tenali
Municipality, 2) Narasaraopet Municipality, 3) Chilakaluripet Municipality, 4) Sattenapalli
Municipality 5) Ponnur Municipality, 6) Mangalagiri Municipality, 7) TadepalliNagar Panchayat,
consisting a total area of 341.78 Sq.kms and an estimated population of 24,11,352 Lakhs (in the
year 2011) evolved a project for processing and disposal of Municipal Solid Waste (MSW) at
Scientific Landfill (Project) and Waste to Energy processing.
In order to achieve economies of scale and for better coordination the participating above urban
Local Bodies have authorized the Guntur Municipal Corporation (Lead ULB) to develop Project on
their behalf for enabling construction of Waste to Energy Processing Facility processing of MSW and
disposal of MSW at Scientific Landfill.
Accordingly the Lead ULB Guntur Municipal Corporation entered into Concession Agreement on
06.02.2016 with the Concessionaire i.e. M/s. Jindal Urban Waste Management (Guntur) Limited,
Concession Agreement and appointed the Concessionaire to perform to execute and implement
project under agreed terms and conditions as set forth in the said Concession Agreement for a
period of 25 years.
for due implementation of the project arid to discharge its obligations under the Concession
Agreement by the Concessionaire the Lead ULB Guntur Municipal Corporation is now handing over
the property admeasuring Ac 15.50 cents mentioned in the schedule herein after described along
with site map attached thereto to the Concessionaire by way of land lease agreement (Agreement)
for the purposes of performing, executing and implementing the project including constructing,
Operating and maintaining the integrated MSW Processing Facility and Scientific Landfill, on the
Demised Premises, on the terms and condition and subject to the covenants and stipulations
hereinafter contained.
NOW THIS INDENTURE OF LEASE WITNESSETH AS FOLLOWS:
1.This Lease Agreement shall be co-terminus with the Concession Agreement and is to be
read, for any interpretation; together with the provisions of the Concession Agreement.
2.The terms that are used but not defined in this Agreement shall have the same meaning as
given to them in the Concession Agreement.
3.In consideration of the Lessee undertaking to implement the project in accordance with the
provisions of the Concession Agreement and undertaking to pay the Lease Payment ("Lease
Payment") stipulated in Clause 4 below; the Lessor hereby demises to the Lessee, all the
land (together with any physical structure existing thereon) which is described, delineated
and shown in the Schedule hereto (the "Demised Premises"), to hold the said Demised
Premises, without interruption or interference together with the full and tree right and
liberty of way and passage and other rights in relation thereto, for as long as the Concession
Agreement does not lapse due to expiry of its terms or is not terminated earlier in
accordance with the provisions thereof. The Lessor be entitled to handover possession of
the Demised Premises in parts. The term of this Agreement shall be co-terminus with the
Concession Agreement. The Lessor hereby agrees and authorizes the construction, operation
and maintenance of each of the Project Facilities on the Demised Premis4 in accordance
with the terms of the Concession Agreement.
Lessee ssor 4,anage
Page 2 of 9
•
Commissioner-
MUNICIPAL CORPORATIO'.
GUNTUR.
AM
Identified by Witness:
SI No Thumb Impression
Photo
1
P.RAMA KRISH61A::20 07 2010.16::
[726-1-2018-2580
2 z •••••,
f f 726.1-2018-2580] P.RAV1SANKAR::20 7 2018.1 ,
In the Form of
Patter RAR-1 6 4.
t!IllkiANGIFUtAM
Name & Address
P.RAMA KRISHNA
S/0 KUTUMBAIAH
HYDERABAD
P.
P.RAVI SANKAR
S/O GURUSWAMY
TADIPARTHI
Signature
kk,onz
P)A
-1 20th day of JuIy,2018
Signature of J T S BREGISTRAR164
h angiurarn
Section 88
`3"--1-1
I have satisifed myself as to the execution of the Instrument by who Is exempted from(-N".1 3'•--Vis5--1---
personal appearance under section 88(1) of the Registration Act, 1908
Date
Endorsement:
Desc
Online Stamp Challan Cash ' SD u/s 16 Stock DD/BC/
Papers u/s 41of IS Act of IS act
SD 0 100 960000 0 0 0 0 960100
TD 0 NA 0 0 NA 0 0
RF 0 NA 6500 0 NA 0 6500
UC 0 NA 500 0 NA 0 500
TOT 0 100 967000 0 0 0, 967100
NOTE TaTransfer Duty, SD:Starnp Duty, RF:Rogistration Fee ,UC:=User Charges, TOT:Total, Desc:Description
Rs. 960000/- towards Stamp Duty including T.D under Sertion 41 of I.S. Act, 1899 and R:_-,. .6500/- towards Registration Fees on the chargeable value of Rs. 6396917/- was paid by the party through Challan/BC/Pay Order No ,2101558401,2101559475,2101559525 dated ,19- JUL-18,19-JUL-18,19-JUL-18.
Total Holding Pay Order
oCE
The Seal of
()int Subitogisl.r.si
Office
Phirangipuram
Generated On:20/07/2018 04:58:11 PM
Lessor
Commissioner
MUNICIPAL CORPORATION
GUNTUR
Page 3 of 9
?pager/4,
Lessee
/>-
4. In consideration of the handover of the Demised Premises under this Agreement, the Lessor
shall, from the Commercial Operation Date (COD), receive a Lease Payment payable per
annum as per the following Table on or before the 10 1h day of the first month in each
Accounting year. The Lease payment per acre for the Demised Premises shall be as per
Background bid Documents as per Minutes of meeting held with WtE developers and
officials of stakeholders by Principal Secretary, MA&UD., on 09.12.2016 at 4.00 pm in
Velagapudi, and Endt.No.3344/2015/M3,on 13.12.2016 ENDORSEMENT issued by Director
of municipal Administration,Govt of AP, Gorantla, Guntur.As per the provisions of
G.O.No 571 Revenue (Assignment - I) Department date:14.09.2012, 10% of the bid
document value is fixed as price per acre. The Lease rentals shall be enhanced in every block
of 5 years by increasing 10% on the lease rental of the previous block of 5 years. As per Bid
document value land cost per acre: Rs33.80 Lakhs. All taxes, including the lease tax, in
relation of the Lease of the Demised Premises shall be borne and paid the Lessee.
The Government of Andhra Pradesh vide GO.Ms.No 509 Revenue (Assignment -
Department dated:14.11.2017 accorded permission to the District Collector Guntur to
alienate / Transfer an extent Ac 51.24 cents Government Land (AWD) in sy.,No 933 to an
extent of Ac 6.S4cents,SyNo 938, Ext. Ac .8.96 cents,Sy No 947 Ext Ac 6.60cents, Sy No .949
I-xt Ac 3.66 cents Sy no 951 Ext Acs 7.20 cents, Sy.No 952, Ext Ac. 16.64 cents, Sy no 954 Ext
: Ac 1.64 cents etc...Govt land (AWD) of Kondaveedu (V) Edlapadu (M),Guntur District in
favour of Municipal Administration & Urban Development Department for establishment of
compost yard for the purpose of Municipal Corporation, Guntur on free of cost basis,
subject to issue of notifications U/S 4(1) (c) of AP Assigned lands (POT) Act 1977 for utilizing
the same for public purpose, subject to certain conditions. In pursuance of the orders of the
Government the Collector and District Magistrate Guntur Vide proceedings
No. Rdis.No.4426/2007-E1 dated: 07.01.2018 transferred and allotted an extent of Ac
51.24 cents of Government Land (AWD) described above in favor of the Municipal
Administration and Urban Development Department on free of cost for establishment of
Compost yard for the purpose of Municipal Corporation Guntur for government purpose for
utilizing the same for public purpose subject to conditions in addition to the conditions
under BSO 24 and GO.Ms.No. 571 Revenue (Assignment - I) department
dated.14.09.2012.The Collector and District Magistrate Guntur also directed
ThasildarEdlapadu Mandal to handover the possession of above land duly making necessary
changes in the webland and mandal records to submit the copy of handedover possession
of the land certificate.
The Collector and District Magistrate Guntur vide certificate in R.Dis No.4426/2007 dated,
06.02.2018 ordered that an extent of Ac 15.50 cents the Sy.No. 933 and 938 of Kondaveedu
out of Ac 51.24 cents of lands alienated in favor of Municipal Administration an Urban
Development department has been allotted to the M/s. Jindal Urban Waste Management
(Guntur) Limited for construction of Waste to Energy project for a period of 25 years on
lease basis as per the Concession Agreement entered by the Lead ULB i.e. Guntur Municipal
Corporation with M/s. Jindal Urban Waste Management (Guntur) Limited. The Collector and
District Magistrate permitted the Commissioner, Guntur Municipal Corp • e. ute
Generated On:20/07/2018 04:58:11 PM
The Scat of
olnt Subqegistra
Ofrice Phiranglpuram
a
Date
20th day of JuIy,2018
Signatu f Registering Officer
angipUram , •
RV. NAGESt ARARAO JOINT S1JD-REGISTRAR-164
PHIRANG1PURAM
CHAS CHALLAN DETAILS AS
SE>i. Bmnch C;ode t.', !'"
- —
I
CA? 7117 22-5-17 cf6ccioc).. _ _ _ 6160c4c7
.52c'
5C) (167oon
i0IN 1 RAFZ.164
V. WARApAo
PHIRANGIPURANI
the land lease agreement in respect of property admeasuring Ac 15.50 cents in Sy.No933
Ac 6.54 cents and Sy.No. 938 Ac 8.96 cents of Kondaveedu Village,Edlapadu Mandal,
Guntur District in favor of M/s Jindal Urban Waste Management (Guntur) Limited for
establishment of Waste to Energy plant operations for a period of 25 years on lease basis.
The Collector and District Magistrate Guntur directed the Registration and Stamps
department to register the lease agreement concluded between the Guntur Municipal
Corporation in respect of property admeasuring Ac 15. 50 cents in Sy.Nos 933 and 938 of
Kondaveedu village, Edlapadu (Mandal) Guntur District (the Sy.No are classified as
prohibited properties under section 22 A (1)(b) of Registration Act 1908).
EXECUTION OF NEW LAND LEASE AGREEMENT:
As per provisions laid down in the schedule 19 of the concession agreement made on
06.02.2016 the Government of AP has accorded permission to lease out the land under
G.O.MS NO 160 MA& UD (J2) Department to Guntur municipal corporation to lease out the
land in sy.nos. 933 & 938 at Kondaveedu (V), Edlapadu (Mandal), Guntur (Dt) in favor of
M/S Jindal urban waste management (GUNTUR) Ltd for setting up 15 MW waste to energy
project .Accordingly the Land lease agreement has been entered by and between the lead
U113 Guntur Municipal Corporation and MIS Jindal Urban Waste Management (GUNTUR) Ltd
on 15.12.2016. Whereas due to administrative delay inalienation of land to Guntur
Municipal Corporation and delay in issuance of the orders exempting the stamp duty 2% on
• the improvements on the project building by the Government as requested by the
M/s Jindal Urban Waste Management (Guntur) Limited the land lease agreement document
could not be presented before the sub-Registrar within 4 month of time as stipulated in the
Registration Act 1908. Therefore on the advice of District Registrar of Narasaraopeta vide
letter No.G1 599/2018 dated: 18.05.2018 stating that the land lease agreement entered
between Guntur Municipal Corporation and M/s Jindal Urban Waste Management (Guntur)
limited dated: 15.12.2016 could not be allowed for registration as time allowed for the
presentation of the document from the date of execution has been lapsed i.e. 4 months
from date of execution without fine and another 4 months with fine. Therefore on the
directions of Municipal Commissioner Guntur, the present land lease agreement is
executed.
Stamp Duty Exempted on improvements made by lessee, G.O.MS. NO. 337, Revenue
(Registration. II) Department Dated 28.06.2018:
The Government of AP has exempted payment of stamp duty on the value of improvements
for M/S Jindal urban waste management(GUNTUR) Ltd in the leased land at Sy no 933& 938
Kondaveedu (V), Edlapadu (Mandal), Guntur (Dt) for setting up waste to energy plant under
section 9(1) (a) of Indian stamp Act 1899 and accordingly issued orders vide G.O.Ms.No.
337, Revenue (Registration. II) Department, dated 28.06.2018.
Term of the lease amount and mode of payment of lease:
The lease amount payable by lessee in favor of lessor is finalized as per the Minutes of the
Meeting held with WtE (Waste to Energy Project) developers and officials of stake holders
by the Principal Secretary Municipal Administration and Urban Development department on
09.12.2016. During the meeting it was decided to adopt GO.Ms.No 571 uniformly across all
the ULB for calculation of Lease payment instead of GO.No.56. As per the Go.No.571, 10%
of the bid document value is fixed as price per acre The Lease rentals shall 17e, enhanced in
ageo Lessee
Page 4 of 9 Commi.s.siorier
MUNICIPAL CORPORATION
GUNTUR.
Cx\
/
tricc•
Generated On:20/07/2018 04:58:11 PM
a Tim seal ot
miot Subltegiskrar
Orrice
Phirangipuram
CEkilFiC.4TE OF REGISTRATION Reuistered as document No.2-5j of 20 Book-I and assigned
ide.nttion number
291.r scanni
REG!S& RING
PV NA WA RAR jC)INT SUB-R
PHIRANGIPURAM
c v ia FR: Gq, sc A rite lloctonent ha :Hoc,/ with the Igenti(ic
every block of 5 years by increasing 10% on the lease rental of the previous block of 5 years.
As per Bid document value land cost per acre: Rs 33.80 Lakhs. Accordingly an amount of Rs.
338000 per acre per annum towards lease was fixed. Accordingly a lease amount of Rs.
5239000 per annum was fixed for the lease land. The lease rentals shall be enhanced in
every block of 5 years by increasing 10% on the lease rental of the previous block of 5 years.
Also as per Concession Agreement the original Commercial Date of Operation 06.06.2018
(28 months from the date of signing of the Concession Agreement) and the Commercial
date of operation is extended to December — 2018 by the Commissioner, GMC, vide letter -
Lr.No: 26/EE/GMC/WTE/2017 - 18 dtd: 17.01.2018. Accordingly the details of lease payment
IIICIII.IVIICV VGIVVY •
SI.No Period of Lease Lease Amount per
annum
Total Rent
(Annual Rent X 5 years)
1 01.01.2019 to 31.12.2023
(5 years)
Rs. 5239000 Rs.26195000/-
2 01.01.2024 to 31.12.2028
(5 years)
Rs. 5762900 Rs. 28814500/-
3 01.01.2029to 31.12.2034
(5 years)
Rs. 6333190 Rs. 31695950/-
4 01.01.2035 to 31.12.2039
(5 years)
Rs. 6973109 Rs. 34865545/-
5
. _. Total
01.01.2040 to
31.12.2045(5 years)
Rs. 7670423 Rs. 38352115/-
25 years Rs.159923110/-
Average Annual rent = Rs. 159923110/25 years = Rs.6396924/-
33
80
00
r.)
L.-)
et, to Lead ULB indicated as:
7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
37
18
00
37
18
00
37
18
00
37
18
00
40
89
80
40
89
80
40
89
80
40
89
80
40
89
80
44
98
78
44
98
78
44
98
78
44
98
78
44
98
78
49
48
66
49
48
66
49
48
66
494
86
6
49
48
66
57
62
90
0
57
62
90
0 0
06
Z9
LS
06
16
EE
9 6
33
919
0
63
39
19
0 0
61
6E
E9
. 6
33
91
90
60
TE
L6
9
60
1£
L6
9
60
1£
L6
9 6
97
310
9
69
73
10
9
76
70
42
3
76
70
42
3
76
70
42
3
767
04
23
767
04
23
ial
e
ent
s.)
.50
is
52
39
00
0
523
900
0 I
52
39
00
0
52
39
000
_
1
52
39
00
0 0
06
Z9
LS
00
6Z
9L
S
Yea
Annu
leas '
paym
(in Rs.
Acrc
Ann
leas
paym
(in R
fo
Ac.15
Cen
5. The Demised Premises are being handover to the Lessee, under this Agreement, free from
any Lncumbrances (other than the existing physical structures thereon which has been
inspected by the Lessee and agreed to be taken over in accordance with the terms of the
Concession Agreement), whether legal or physical in nature. At any time during the terms of
this Agreement if the Lessee discovers any Encumbrances under the Demised Premises
which materially adversely affect its rights in relation to the Demised Premises the Project, it
vtageniele
is Lessee
Page 5 of 9 ,ommissioner
MUNICIPAL CORPORATION
GUNTUR,
iAti7-.7- )6D
fic-P4)
ec? J7
IST
RA
R1
64
y
,1/40cf. c), -'"
Generated On:20/07/2018 04:58:11 PM
1'he Seal, of
olot Sublleglstrar
Office Phirangipuram
0
Page 6 of 9
shall notify the lessor, which shall, within twenty one (21) days from the receipt of the
notice, either remove or clause to be removed such encumbrances at its own cost. In the
event that the Lessor fails to remove such encumbrances within twenty one (21) days from
the notice thereof, the Lessee may remove or cause to be removed such encumbrances and
the costs and expenses or consequential liabilities incurred in respect thereof shall be
reimbursed to the Lessee by the Lessor.
6. The Demised Premises are being handover to the Lessee, under this Agreement only for the
purposes of the project including for the purposes of developing, establishing, designing,
constructing, operating and maintaining the Plant, which the Lessor is desirous of being
constructed, operated and maintained on the Demised Premises for the purposes of
enabling the processing and disposal of MSW in accordance with the Concession Agreement.
The Lessor hereby authorizes and consents to the receipt of consignment of Municipal Solid
Waste, the Storage and processing of Municipal Solid Waste to energy inside the Demised
premises and disposal of MSW at Scientific Landfill outside the Demised Premises.
/. The Lessor herby authorizes the Lessee, to construct, erect, own, operate, and maintain any
superstructures, facility or any movable or immovable structures comprising each of the
Project Facilities on the Demised Premises and for that purpose also remove, renovate, use
or demolish any structures that may be existing on the Demised Premises as of the date of
this Agreement. The Lessee hereby agrees that the construction, operations and
maintenance of the each Project Facility at the Demised Premises and the receipt, storage
and processing of Municipal Waste at the Demised Premises, being undertaken pursuant to
the Concession Agreement granted by it and forth purposes of enabling the Participating
ULBs to discharge their functions of managing, processing and disposing Municipal Waste.
8, The Lessee shall have the right to, after taking prior permission of the Lessor, vest with the
Lenders the power to take over the control, possession and all rights and interest in relation
to the Demised Premises by appointing a person, the Nominated Company, to replace the
lessee and undertake the construction, operation and maintenance of the Plant upon the
occurrence of an Event of Default by the Lessee, as the case may be under any of the
f inancing Agreements for the Project. The Lessor shall then assign / novate this Agreement
in favor of the Nominated Company, which shall constitute an agreement between the
Nominated company and the Lessor on the terms and conditions of this Agreement as
existing at the time of such assignment / novation.
9. the Lessor hereby authorizes the Lessee to create any Encumbrance over the Project
facilities constructed on the Demised Premises (excepting the land) and this Agreement in
favour of the Lenders for enabling financing of the construction, operation and maintenance
of the Project. The Lessor agrees that it shall facilitate such Agreement as may be required
by the Lenders to enable financing of the Project and creation of the Encumbrance required
by the Lenders.
10. Without prejudice to the terms of this Agreement, the Lessor shall be governed by the terms
of any agreement that the Lenders may have entered into with the Lessor in respect of the
Encumbrance over the Project Facilities (other than the land constituting the Site which shall
not be mortgaged), any assets of the Project and this Agreement, created in favour of the
Lenders. Only the lease rights for the land can be transferred to the Lender
1,101.":1144217/e,› Lessee
Commissioner
MUNICIPAL CORPORATION
GUNTUR.
Page 7 of 9 \cc')
Lessee
11. The Lessor hereby covenants and assures the Lessee that:
a) All the land comprising the Site is permitted and duly authorized and earmarked for
purposes of establishment, construction, operation and maintenance of the Plant and
the Project Facilities;
b) The Site is free from any encroachment or encumbrances whatsoever and is not subject
to any acquisition or other legal proceedings by any Participating ULBs, body or
government nor is any claim of any third party subsisting in respect thereof or relating
thereto:
c) Lessor is the lawful owner of the lands constituting the Demised Premises and it shall, in
that capacity, defend or satisfy all actions or claims against the use of the Demised
Premises for the Project:
d) Subject to Clause 4, it shall not increase the lease payment due and payable by the
Lessee under the provisions of this Agreement:
e) It shall not interfere with or impede in any manner or otherwise limit, restrict or impose
any conditions or restrictions on the complete, free and full enjoyment and use of the
Demised Premises and all rights in relation thereto, including the creation of security
interest in favour of the Lenders in accordance with the provisions of the concession
Agreement:
f) Subject to terms of the Concession Agreement, it shall not interfere in or impede in any
manner or otherwise limit, restrict or impose conditions in relation: (i) to the
construction, operation and maintenance of the MSW Processing Plant; (ii) the
implementation of the Project by the Lessee and (iii) the possession, control and use, by
the Lessee of the Demised Premises and the plant;
g) It shall enter into appropriate further documentation or additional writing as the Lessee
or the Lenders may reasonably require to give effect to the provisions of this Agreement
and the Financing Agreement.
h) There are no litigations, claims, demands or any proceedings ( whether administrative,
legal or quasi-judicial) pending before any Participating ULBs in respect of the Demised
Premises or its use for the purposes of managing, processing and disposing MSW; and
) The Lessee shall have complete, lawful and uninterrupted, possession, control and use
of the Demised Premises.
12. The Lessee hereby covenants with the Lessor as follow:
a) That it shall implement the Project in accordance with the Concession Agreement
and
b) That it shall observe and perform all terms, covenants, conditions and stipulations of
this Agreement.
13. The Lessor has lawful title, possession and control of all the lands constituting the site and
has the requisite right and Participating ULBs to lease the same to Lessee for the Term for
the purposes of the project on the terms and conditions of this Agreement and further that
Lessee shall have full, free and uninterrupted peaceful Vacant Possession, enjoyment /
occupations and use of the Demised Premises throughout the Concession Period, without
any obstruction interference or disturbance or claim whatsoever from the Lessor or from
any person claiming through under or in trust for Lessor or from any third person
whomsoever. Lessor shall keep Lessee fully indemnified and harmless against any claims or
demands from any Person claiming right, title or interest to or in the Demised Premises or
Commissioner
MUNICIPAL CORPORATION
GUNTUR.
any part thereof or challenging the validity of the usage of the Demised Premises for the
Project or challenging the validity of this Agreement, as also against any actions,
proceedings, damages; losses and expenses caused to Lessee as a result or in consequences
of any such claims or demands as aforesaid.
14. (a). Subject to Sub-Clause (b) and (c) below, no assignment of this Agreement or any rights
or duties hereunder shall he made in whole or in part to, by any Party without prior written
consent of the other Party and in the event of any assignment the assignee shall assume the
duties and liabilities of the assignor.
(b). It is hereby specifically agreed that the Lessee shall, in the event of forming a limited
company either as subsidiary company or jointly along with any other company or
otherwise, be at liberty to assign and transfer the plant, the Demised premises and this
Agreement or the rights and benefits hereof or duties hereunder to such newly formed
limited company or any of its holding company for the time being and not in favour of such
subsidiary company of the Lessee. The Lessee, shall; however, in such event obtain formal
consent from the Lessor, which consent shall not he withheld by Lessor. Any assignment by
the Lessee shall be subject to the condition that the assignee shall assume the duties and
liabilities of the Lessee.
(c). the Lessor hereby agrees that the Lessee shall not require any prior approval of the
Lessor for creating any Encumbrance, right, title, or interest over the Demised Premises
(excepting land) and the Project Facilities under his ownership in accordance with the
Concession Agreement in favour of the Lenders.
(d). Lessor confirms that the Financing Documents may include suitable rights in favour of
the Lenders for taking over the Demised Premises (excepting land) and the plant for
management, in enforcement of their security upon the happening of an event of default
there under the Concession Agreement on the part of the Lessee.
15. The Lessor hereby assures and represents to the Lessee that the handingover of the .
Demised Premises under this Agreement shall be irrevocable for as long as the Concession
Agreement remains in force and the Lessor shall not Terminate or seek to Terminate this
Agreement except upon the expiry or early Termination of the Concession Agreement. The
Patties hereby agree that on expiry or Termination of the Concession Agreement, the
Demised Premises shall be handed back to the Lessor in accordance with the provisions of
the Concession Agreement and that this Agreement within 48 hours if termination or it shall
he deemed to have been handed over.
it). Any dis .putes and / or differences arising between the Parties, in relation to or under this
Agreement will be resolved through arbitration in accordance with Article 36 of the
Concession Agreement as per provisions of the Arbitration and Conciliation Act; 1996. The
governing law of the arbitration shall be Indian law. The Lessor hereby recognizes that this is
a commercial act being undertaken by the Lessor and that it herby unconditionally and
irrevocably waives any right of immunity, sovereign or otherwise from legal proceedings that
osixageitnay he initiated to enforce any provisions of this Agreement.
Commissioner
MUNICIPAL CORPORATIOr
• GUNTUR.
Lessee
Page 8 of 9
*
oartage4
SIGNED : SEALED AND DELIVERED
IN 1WI. NAME AND ON BEHALF OF
1111 LESSOR THROUGH:
AUlliottisba sIGNATPAY
SIGNED; SEALED AND DELIVERED
IN THE NAME AND ON BEHALF OF
THE LESSEE TROUGH:
to
fi
AUTHORISED SIGNATORY
Commissioner
MUNICIPAL CORPORATION
GUNTUR.
The details of map enclosed to the agreement.
S.no -r Survey no Extent of land Location of the Land
1
2
933 Ac 6.54 Cents Kondaveedu (vill),Edlapadu (Mandal), Guntur
District, Andhra Pradesh
938 Ac 8.96 Cents Kondaveedu (vill),Edlapadu (Mandal), Guntur
District, Andhra Pradesh
3 Total Ac 15.50 Cents Lam_ I
SCHEDULE OF THE PROPERTY:
All the piece and parcel of land located in Sy. No. 933 & 938 in Kondaveedu (Vill),
x Ko-r-T-A pALs-m. Edlapadu (M), Phirangipuram Sub-District, Narasaraopet registration District of Guntur (Dt)
bounded by:
East
: Land in Sy. No. 939
West : Kondaveedu Reserve Forest
North : Road
South : Land in Sy. No 934 & 937
Within these boundaries an extent of Ac. 15.50 cents of Landis located.
IN 1111 WITNESS WHEREOF the Parties have affixed therein and sealed to this Lease Agreement the
19 1h day of July in the year 2018 hereinabove written:
IN PRESENCE OF:
(p• 120. Nv. a, (Csi ■ .g b\LAsti.)
illeitur Municipal Cut Pot ant i .
GUNTUR
Vrt4- b
essee ._c\,. 1/41.2 ,fc.v. ■A4,
Page 9 of 9
/A-cit-ox-o:N/ • S2 kS-
-70/ 2_
LAS
030
No. 95
PERECHERLA
GC1CTUR I A LIA
054
1 • 040
044
047
Cc..
POTTURU CLAJTIA TALUK
040
• 004
PofInn. 3 4,04
042
fie.i.nnuod
1062
nir i y-
..mm 0.0.0o• non ...44.5
Iti4.113 P. L P.. C I 4; 3410*AS
loeves twa occ.c.04.,
114exa- C-(5107 "
, ;45A (3144
SURVEYOR pot ApAD,/
7:)IST7.K
net oI rt f.„0.pir)sN.
01LPCOLOC
No. 131
KONDAV1DU 6th BIT
NARASARAOPET TALUK
clkerua ocaTfacr e t.: ,, c1.44e) Inn 41 MA
*wk. • OKA.. -1 D4.14 706
1.41.*C•0 0 s 10 IS C Ae•no
11011041011%1010000.01041001100401a1000
004 Of40.10 not Of 40. owl n.a.n01044sc• 4.4~4005 as oor .00e on trop the, Cosloate. Print4.4, Fonlo......74..11140 14 kW *OW,
H ILL
PALL. Paton, .an.
Hasooet
"f41.0 ar 14"40447
0444404 nna.t•
6. 1,4f
9 Cromer.
10I{
t. L410. 001.
A Loan& MHO
root *Ma
Can Dian
[WAN •40.1
na.44440 soaa lawoOvie
0404.040 •440 .re one awn.
1104....ny
Taneorao•
IFsna,. C0100 and at0.44o.
anoottosololt•
.:: Cobra,. ewe. OrlOaL
4..7: Yer ra
onnnoo..
T401.0oraft 00
Pernta4441 CO.
70.0.4.4., 50
Sflo4f0
00444 400
22 14040 041
140..414)••,
N.111r•n ,
S-4,40
44111.40
Saved
04fltle•04...0
Ster 4 1a .144 eoweno
{. taw of
P ,IoM
1.11040tan'i 0.7 90,00: 500:104
MY. .n foot s0.51.• se•
140.00,4
wawa. .0,01'
4.54.410.5.44000.4
it•ULA
0 MLOOM 01044 0140014
TO•000At caw,.
,v4. • ■•■ •
71' 01430
000.J,
4 licoott,suo ar 0:04,
User Login: 21000566500000999
Monthly Contribution > Online Challan Status
ChallanDoubleVerlfIcation
Friday, December 14, 2018 1:19:27 ig
PM
Transaction Details ' Required Fields
Transaction status:
Employer's Code No:
Employer's Nifile:
Challan Period:
Challan Number:
Challan Created Data
Challan Submitted Date
Amount Paid:
Transaction Number:
Transaction Completed Successfully
21000566500000999
CEEKAY ASSOCIATES PVT LTD
Nov-2018 . _
02118135870101
12-12.2018 12:05:57
13-12-2018 16:18:04
168334.00
CPL6029282
' Required Fields
Employer's Code No.:
ChallanDoubleVerification htt ://w w w.es ic .in/ES LC laskicutclakcxt.W.,Q.,(MM\.\\\. cAl\\
\Flo-71e ES1C
EllIPIOYeelZI ' State 11 isurance Corporation
Insurance
DISCLAIMER: Content owned, maintained and updated by Employee's State Insurance Corporation. Copyright 2009, ESIC, trdia. All Rights Reserved. Best
viewed In 1024 x 768 pixels, Designed and Developed by Wipro LTD.IP Address : 48.ASP Session ID ulow4r45troscqebedgm2q55
I of 1 14/12/2018 1:19 1