Sheet2COPY ANALISA BOR PILEPek. Bore pile dia 1203.7994Tiang bor dia 120 cmbiaya Pengeboran ( upah Bor )m111,070.11853,000.009,442,800,000.0310,492.000volume terpasangBiaya Pengecoran ( upah cor beton )m311,860.16190,000.002,253,429,792.0011,070.11m' bor853000Biaya Pasang Besi ( upah,turun,masukkan )kg922,357.042,000.001,844,714,087.041.130190000Beton Readymix K400m311,860.161,153,380.0013,679,267,649.98922,357.0442000Besi beton ulir ( bjtp -40 ), dia 13 spiralkg211,477.6410,883.312,301,576,752.501153380Besi beton Ulir ( bjtd -40 ) dia 25kg710,879.4010,883.317,736,720,882.81211,477.64410883.31Buang Tanah Lumpur bekas borm312,507.89132,750.001,660,421,896.5438,918,931,060.91710,879.40010883.31keuntungan 10 %12,507.89132750jumlah38,918,931,060.91Dibulatkan38,918,931,060.004018548.12518643hasil perhitunganTiang bor per m'3,709,391.073709391.06557377309157.059612657