DIV. 9 PEK. HARIAN

34
ITEM PEMBAYARAN No. : 9.4 JENIS PEKERJAAN : PEKERJAAN HARIAN SATUAN PEMBAYARAN : JAM URAIAN ANALISA HARGA SATUAN No. U R A I A N KODE KOEF. SATUAN KET. A. URAIAN PERALATAN 1. Jenis Peralatan DUMP TRUCK 3-4 M3 (E08) 2. Tenaga Pw 100.0 HP 3. Kapasitas Cp 6.0 Ton 4. Umur Ekonomis A 5.0 Tahun Alat Baru 5. Jam Operasi Dalam 1 Tahun W 2,000 Jam Alat Baru 6. Harga Alat B 120,176,000 Rupiah Alat Baru B. BI AYA PASTI PER JAM KERJA 1. Nilai Sisa Alat = 10 % x Harga Alat Baru C 9,240,454 Rupiah 2. Faktor Angsuran Modal = i x (1 + i)^A D 0.29128 - (1 + i)^A - 1 3. Biaya Pasti per Jam : a. Biaya Pengembalian Modal = ( B - C ) x D E 16,156.85 Rupiah W b. Asuransi, dll = 0.002 x B F 120.18 Rupiah W Biaya Pasti per Jam = ( E + F ) G 16,277.03 Rupiah C. BI AYA OPERA SI PER JAM KERJ A 1. Bah an Bak ar = (0 .1 25 -0.1 75 Ltr /H P/J am) x Pw x Ms H 34, 37 5. 00 Rup iah 2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 17,500.00 Rupiah 3. Perawatan dan (12,5 % - 17,5 %) x B K 7,511.00 Rupiah perbaikan = W 4. Operator = ( 1 Orang / Jam ) x U1 L 5,714.29 Rupiah 5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 4,285.71 Rupiah Biaya Operasi per Jam = (H+I+K+L+M) P 69,386.00 Rupiah D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 85,663.03 Rupiah E. LAIN - LAIN 1. Tingkat Suku Bunga i 14.00 % / Tahun 2. Upah Operator / Sopir L 5,714.29 Rp./Jam 3. Upah Pembantu Operator / Pmb.Sopir M 4,285.71 Rp./Jam 4. Bahan Bakar Bensin Mb 3,240.00 Liter 5. Bahan Bakar Solar Ms 2,750.00 Liter 6. Minyak Pelumas Mp 17,500.00 Liter File : 89627764.xls.ms_office 

Transcript of DIV. 9 PEK. HARIAN

Page 1: DIV. 9 PEK. HARIAN

8/2/2019 DIV. 9 PEK. HARIAN

http://slidepdf.com/reader/full/div-9-pek-harian 1/34

ITEM PEMBAYARAN No. : 9.4

JENIS PEKERJAAN : PEKERJAAN HARIAN

SATUAN PEMBAYARAN : JAM URAIAN ANALISA HARGA SATUAN

No. U R A I A N KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN

1. Jenis Peralatan DUMP TRUCK 3-4 M3 (E08)

2. Tenaga Pw 100.0 HP

3. Kapasitas Cp 6.0 Ton

4. Umur Ekonomis A 5.0 Tahun Alat Baru

5. Jam Operasi Dalam 1 Tahun W 2,000 Jam Alat Baru6. Harga Alat B 120,176,000 Rupiah Alat Baru

B. BIAYA PASTI PER JAM KERJA

1. Nilai Sisa Alat = 10 % x Harga Alat Baru C 9,240,454 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.29128 -

(1 + i)^A - 13. Biaya Pasti per Jam :

a. Biaya Pengembalian Modal = ( B - C ) x D E 16,156.85 Rupiah

W

b. Asuransi, dll = 0.002 x B F 120.18 Rupiah

W

Biaya Pasti per Jam = ( E + F ) G 16,277.03 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 34,375.00 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 17,500.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B K 7,511.00 Rupiah

perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 5,714.29 Rupiah

5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 4,285.71 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 69,386.00 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 85,663.03 Rupiah

E. LAIN - LAIN

1. Tingkat Suku Bunga i 14.00 % / Tahun2. Upah Operator / Sopir L 5,714.29 Rp./Jam

3. Upah Pembantu Operator / Pmb.Sopir M 4,285.71 Rp./Jam

4. Bahan Bakar Bensin Mb 3,240.00 Liter

5. Bahan Bakar Solar Ms 2,750.00 Liter

6. Minyak Pelumas Mp 17,500.00 Liter

File : 89627764.xls.ms_office 

Page 2: DIV. 9 PEK. HARIAN

8/2/2019 DIV. 9 PEK. HARIAN

http://slidepdf.com/reader/full/div-9-pek-harian 2/34

ITEM PEMBAYARAN No. : 9.5

JENIS PEKERJAAN : PEKERJAAN HARIAN

SATUAN PEMBAYARAN : JAM URAIAN ANALISA HARGA SATUAN

No. U R A I A N KODE KOEF. SATUAN KETERANGAN

A. URAIAN PERALATAN

1. Jenis Peralatan FLAT BED TRUCK 3-4 M3 (E11)

2. Tenaga Pw 125.0 HP

3. Kapasitas Cp 4.0 M3

4. Umur Ekonomis A 5.0 Tahun Alat Baru

5. Jam Operasi Dalam 1 Tahun W 2,000 Jam Alat Baru6. Harga Alat B 105,005,159 Rupiah Alat Baru

B. BIAYA PASTI PER JAM KERJA

1. Nilai Sisa Alat = 10 % x Harga Alat Baru C 10,500,516 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.33438 -

(1 + i)^A - 13. Biaya Pasti per Jam :

a. Biaya Pengembalian Modal = ( B - C ) x D E 15,800.22 Rupiah

W

b. Asuransi, dll = 0.002 x B F 105.01 Rupiah

W

Biaya Pasti per Jam = ( E + F ) G 15,905.22 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 29,531.25 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 15,000.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B K 6,562.82 Rupiah

perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 5,000.00 Rupiah

5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 3,928.57 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 60,022.64 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 75,927.86 Rupiah

E. LAIN - LAIN

1. Tingkat Suku Bunga i 20.00 % / Tahun2. Upah Operator / Sopir U1 5,000.00 Rp./Jam

3. Upah Pembantu Operator / Pmb.Sopir U2 3,928.57 Rp./Jam

4. Bahan Bakar Bensin Mb 1,810.00 Liter

5. Bahan Bakar Solar Ms 1,890.00 Liter

6. Minyak Pelumas Mp 12,000.00 Liter

File : 89627764.xls.ms_office 

Page 3: DIV. 9 PEK. HARIAN

8/2/2019 DIV. 9 PEK. HARIAN

http://slidepdf.com/reader/full/div-9-pek-harian 3/34

ITEM PEMBAYARAN No. : 9.6

JENIS PEKERJAAN : PEKERJAAN HARIAN

SATUAN PEMBAYARAN : JAM URAIAN ANALISA HARGA SATUAN

No. U R A I A N KODE KOEF. SATUAN KETERANGAN

A. URAIAN PERALATAN

1. Jenis Peralatan WATER TANKER 3000-4500 L. (E23)

2. Tenaga Pw 125.0 HP

3. Kapasitas Cp 4,000.0 Liter

4. Umur Ekonomis A 5.0 Tahun Alat Baru

5. Jam Operasi Dalam 1 Tahun W 2,000 Jam Alat Baru6. Harga Alat B 105,005,159 Rupiah Alat Baru

B. BIAYA PASTI PER JAM KERJA

1. Nilai Sisa Alat = 10 % x Harga Alat Baru C 10,500,516 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.33438 -

(1 + i)^A - 13. Biaya Pasti per Jam :

a. Biaya Pengembalian Modal = ( B - C ) x D E 15,800.22 Rupiah

W

b. Asuransi, dll = 0.002 x B F 105.01 Rupiah

W

Biaya Pasti per Jam = ( E + F ) G 15,905.22 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 29,531.25 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 15,000.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B K 6,562.82 Rupiah

perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 5,000.00 Rupiah

5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 3,928.57 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 60,022.64 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 75,927.86 Rupiah

E. LAIN - LAIN

1. Tingkat Suku Bunga i 20.00 % / Tahun2. Upah Operator / Sopir U1 5,000.00 Rp./Jam

3. Upah Pembantu Operator / Pmb.Sopir U2 3,928.57 Rp./Jam

4. Bahan Bakar Bensin Mb 1,810.00 Liter

5. Bahan Bakar Solar Ms 1,890.00 Liter

6. Minyak Pelumas Mp 12,000.00 Liter

File : 89627764.xls.ms_office 

Page 4: DIV. 9 PEK. HARIAN

8/2/2019 DIV. 9 PEK. HARIAN

http://slidepdf.com/reader/full/div-9-pek-harian 4/34

ITEM PEMBAYARAN No. : 9.7

JENIS PEKERJAAN : PEKERJAAN HARIAN

SATUAN PEMBAYARAN : JAM URAIAN ANALISA HARGA SATUAN

No. U R A I A N KODE KOEF. SATUAN KETERANGAN

A. URAIAN PERALATAN

1. Jenis Peralatan BULLDOZER 100-150 HP (E04)

2. Tenaga Pw 140.0 HP

3. Kapasitas Cp - -

4. Umur Ekonomis A 5.0 Tahun Alat Baru

5. Jam Operasi Dalam 1 Tahun W 2,000 Jam Alat Baru6. Harga Alat B 588,028,890 Rupiah Alat Baru

B. BIAYA PASTI PER JAM KERJA

1. Nilai Sisa Alat = 10 % x Harga Alat Baru C 58,802,889 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.33438 -

(1 + i)^A - 13. Biaya Pasti per Jam :

a. Biaya Pengembalian Modal = ( B - C ) x D E 88,481.22 Rupiah

W

b. Asuransi, dll = 0.002 x B F 588.03 Rupiah

W

Biaya Pasti per Jam = ( E + F ) G 89,069.25 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 33,075.00 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 16,800.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B K 36,751.81 Rupiah

perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 5,000.00 Rupiah

5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 3,928.57 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 95,555.38 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 184,624.62 Rupiah

E. LAIN - LAIN

1. Tingkat Suku Bunga i 20.00 % / Tahun2. Upah Operator / Sopir U1 5,000.00 Rp./Jam

3. Upah Pembantu Operator / Pmb.Sopir U2 3,928.57 Rp./Jam

4. Bahan Bakar Bensin Mb 1,810.00 Liter

5. Bahan Bakar Solar Ms 1,890.00 Liter

6. Minyak Pelumas Mp 12,000.00 Liter

File : 89627764.xls.ms_office 

Page 5: DIV. 9 PEK. HARIAN

8/2/2019 DIV. 9 PEK. HARIAN

http://slidepdf.com/reader/full/div-9-pek-harian 5/34

ITEM PEMBAYARAN No. : 9.8

JENIS PEKERJAAN : PEKERJAAN HARIAN

SATUAN PEMBAYARAN : JAM URAIAN ANALISA HARGA SATUAN

No. U R A I A N KODE KOEF. SATUAN KETERANGAN

A. URAIAN PERALATAN

1. Jenis Peralatan MOTOR GRADER >100 HP (E13)

2. Tenaga Pw 125.0 HP

3. Kapasitas Cp - -

4. Umur Ekonomis A 5.0 Tahun Alat Baru

5. Jam Operasi Dalam 1 Tahun W 2,000 Jam Alat Baru6. Harga Alat B 424,220,842 Rupiah Alat Baru

B. BIAYA PASTI PER JAM KERJA

1. Nilai Sisa Alat = 10 % x Harga Alat Baru C 42,422,084 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.33438 -

(1 + i)^A - 13. Biaya Pasti per Jam :

a. Biaya Pengembalian Modal = ( B - C ) x D E 63,832.88 Rupiah

W

b. Asuransi, dll = 0.002 x B F 424.22 Rupiah

W

Biaya Pasti per Jam = ( E + F ) G 64,257.10 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 29,531.25 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 15,000.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B K 26,513.80 Rupiah

perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 5,000.00 Rupiah

5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 3,928.57 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 79,973.62 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 144,230.72 Rupiah

E. LAIN - LAIN

1. Tingkat Suku Bunga i 20.00 % / Tahun2. Upah Operator / Sopir U1 5,000.00 Rp./Jam

3. Upah Pembantu Operator / Pmb.Sopir U2 3,928.57 Rp./Jam

4. Bahan Bakar Bensin Mb 1,810.00 Liter

5. Bahan Bakar Solar Ms 1,890.00 Liter

6. Minyak Pelumas Mp 12,000.00 Liter

File : 89627764.xls.ms_office 

Page 6: DIV. 9 PEK. HARIAN

8/2/2019 DIV. 9 PEK. HARIAN

http://slidepdf.com/reader/full/div-9-pek-harian 6/34

ITEM PEMBAYARAN No. : 9.9

JENIS PEKERJAAN : PEKERJAAN HARIAN

SATUAN PEMBAYARAN : JAM URAIAN ANALISA HARGA SATUAN

No. U R A I A N KODE KOEF. SATUAN KETERANGAN

A. URAIAN PERALATAN

1. Jenis Peralatan WHEEL LOADER 1.0-1.6 M3 (E15)

2. Tenaga Pw 125.0 HP

3. Kapasitas Cp 1.5 M3

4. Umur Ekonomis A 5.0 Tahun Alat Baru

5. Jam Operasi Dalam 1 Tahun W 2,000 Jam Alat Baru6. Harga Alat B 399,019,604 Rupiah Alat Baru

B. BIAYA PASTI PER JAM KERJA

1. Nilai Sisa Alat = 10 % x Harga Alat Baru C 39,901,960 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.33438 -

(1 + i)^A - 13. Biaya Pasti per Jam :

a. Biaya Pengembalian Modal = ( B - C ) x D E 60,040.83 Rupiah

W

b. Asuransi, dll = 0.002 x B F 399.02 Rupiah

W

Biaya Pasti per Jam = ( E + F ) G 60,439.85 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 29,531.25 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 15,000.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B K 24,938.73 Rupiah

perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 5,000.00 Rupiah

5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 3,928.57 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 78,398.55 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 138,838.39 Rupiah

E. LAIN - LAIN

1. Tingkat Suku Bunga i 20.00 % / Tahun2. Upah Operator / Sopir U1 5,000.00 Rp./Jam

3. Upah Pembantu Operator / Pmb.Sopir U2 3,928.57 Rp./Jam

4. Bahan Bakar Bensin Mb 1,810.00 Liter

5. Bahan Bakar Solar Ms 1,890.00 Liter

6. Minyak Pelumas Mp 12,000.00 Liter

File : 89627764.xls.ms_office 

Page 7: DIV. 9 PEK. HARIAN

8/2/2019 DIV. 9 PEK. HARIAN

http://slidepdf.com/reader/full/div-9-pek-harian 7/34

ITEM PEMBAYARAN No. : 9.10

JENIS PEKERJAAN : PEKERJAAN HARIAN

SATUAN PEMBAYARAN : JAM URAIAN ANALISA HARGA SATUAN

No. U R A I A N KODE KOEF. SATUAN KETERANGAN

A. URAIAN PERALATAN

1. Jenis Peralatan TRACK LOADER 75-100 HP (E14)

2. Tenaga Pw 95.0 HP

3. Kapasitas Cp 1.5 M3

4. Umur Ekonomis A 5.0 Tahun Alat Baru

5. Jam Operasi Dalam 1 Tahun W 2,000 Jam Alat Baru6. Harga Alat B 504,024,763 Rupiah Alat Baru

B. BIAYA PASTI PER JAM KERJA

1. Nilai Sisa Alat = 10 % x Harga Alat Baru C 50,402,476 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.33438 -

(1 + i)^A - 13. Biaya Pasti per Jam :

a. Biaya Pengembalian Modal = ( B - C ) x D E 75,841.04 Rupiah

W

b. Asuransi, dll = 0.002 x B F 504.02 Rupiah

W

Biaya Pasti per Jam = ( E + F ) G 76,345.07 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 22,443.75 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 11,400.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B K 31,501.55 Rupiah

perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 5,000.00 Rupiah

5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 3,928.57 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 74,273.87 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 150,618.94 Rupiah

E. LAIN - LAIN

1. Tingkat Suku Bunga i 20.00 % / Tahun2. Upah Operator / Sopir U1 5,000.00 Rp./Jam

3. Upah Pembantu Operator / Pmb.Sopir U2 3,928.57 Rp./Jam

4. Bahan Bakar Bensin Mb 1,810.00 Liter

5. Bahan Bakar Solar Ms 1,890.00 Liter

6. Minyak Pelumas Mp 12,000.00 Liter

File : 89627764.xls.ms_office 

Page 8: DIV. 9 PEK. HARIAN

8/2/2019 DIV. 9 PEK. HARIAN

http://slidepdf.com/reader/full/div-9-pek-harian 8/34

ITEM PEMBAYARAN No. : 9.11

JENIS PEKERJAAN : PEKERJAAN HARIAN

SATUAN PEMBAYARAN : JAM URAIAN ANALISA HARGA SATUAN

No. U R A I A N KODE KOEF. SATUAN KETERANGAN

A. URAIAN PERALATAN

1. Jenis Peralatan EXCAVATOR 80-140 HP (E10)

2. Tenaga Pw 80.0 HP

3. Kapasitas Cp 0.5 M3

4. Umur Ekonomis A 5.0 Tahun Alat Baru

5. Jam Operasi Dalam 1 Tahun W 2,000 Jam Alat Baru6. Harga Alat B 504,024,763 Rupiah Alat Baru

B. BIAYA PASTI PER JAM KERJA

1. Nilai Sisa Alat = 10 % x Harga Alat Baru C 50,402,476 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.33438 -

(1 + i)^A - 13. Biaya Pasti per Jam :

a. Biaya Pengembalian Modal = ( B - C ) x D E 75,841.04 Rupiah

W

b. Asuransi, dll = 0.002 x B F 504.02 Rupiah

W

Biaya Pasti per Jam = ( E + F ) G 76,345.07 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 18,900.00 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 9,600.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B K 31,501.55 Rupiah

perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 5,000.00 Rupiah

5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 3,928.57 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 68,930.12 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 145,275.19 Rupiah

E. LAIN - LAIN

1. Tingkat Suku Bunga i 20.00 % / Tahun2. Upah Operator / Sopir U1 5,000.00 Rp./Jam

3. Upah Pembantu Operator / Pmb.Sopir U2 3,928.57 Rp./Jam

4. Bahan Bakar Bensin Mb 1,810.00 Liter

5. Bahan Bakar Solar Ms 1,890.00 Liter

6. Minyak Pelumas Mp 12,000.00 Liter

File : 89627764.xls.ms_office 

Page 9: DIV. 9 PEK. HARIAN

8/2/2019 DIV. 9 PEK. HARIAN

http://slidepdf.com/reader/full/div-9-pek-harian 9/34

ITEM PEMBAYARAN No. : 9.12

JENIS PEKERJAAN : PEKERJAAN HARIAN

SATUAN PEMBAYARAN : JAM URAIAN ANALISA HARGA SATUAN

No. U R A I A N KODE KOEF. SATUAN KETERANGAN

A. URAIAN PERALATAN

1. Jenis Peralatan CRANE 10-15 TON (E07)

2. Tenaga Pw 150.0 HP

3. Kapasitas Cp 25.0 Ton

4. Umur Ekonomis A 5.0 Tahun Alat Baru

5. Jam Operasi Dalam 1 Tahun W 2,000 Jam Alat Baru6. Harga Alat B 777,038,177 Rupiah Alat Baru

B. BIAYA PASTI PER JAM KERJA

1. Nilai Sisa Alat = 10 % x Harga Alat Baru C 77,703,818 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.33438 -

(1 + i)^A - 13. Biaya Pasti per Jam :

a. Biaya Pengembalian Modal = ( B - C ) x D E 116,921.61 Rupiah

W

b. Asuransi, dll = 0.002 x B F 777.04 Rupiah

W

Biaya Pasti per Jam = ( E + F ) G 117,698.65 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 35,437.50 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 18,000.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B K 48,564.89 Rupiah

perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 5,000.00 Rupiah

5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 3,928.57 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 110,930.96 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 228,629.60 Rupiah

E. LAIN - LAIN

1. Tingkat Suku Bunga i 20.00 % / Tahun2. Upah Operator / Sopir U1 5,000.00 Rp./Jam

3. Upah Pembantu Operator / Pmb.Sopir U2 3,928.57 Rp./Jam

4. Bahan Bakar Bensin Mb 1,810.00 Liter

5. Bahan Bakar Solar Ms 1,890.00 Liter

6. Minyak Pelumas Mp 12,000.00 Liter

File : 89627764.xls.ms_office 

Page 10: DIV. 9 PEK. HARIAN

8/2/2019 DIV. 9 PEK. HARIAN

http://slidepdf.com/reader/full/div-9-pek-harian 10/34

ITEM PEMBAYARAN No. : 9.13

JENIS PEKERJAAN : PEKERJAAN HARIAN

SATUAN PEMBAYARAN : JAM URAIAN ANALISA HARGA SATUAN

No. U R A I A N KODE KOEF. SATUAN KETERANGAN

A. URAIAN PERALATAN

1. Jenis Peralatan STEEL WHEEL ROLLER 6-9 T. (E16)

2. Tenaga Pw 60.0 HP

3. Kapasitas Cp 8.0 Ton

4. Umur Ekonomis A 5.0 Tahun Alat Baru

5. Jam Operasi Dalam 1 Tahun W 2,000 Jam Alat Baru6. Harga Alat B 155,407,635 Rupiah Alat Baru

B. BIAYA PASTI PER JAM KERJA

1. Nilai Sisa Alat = 10 % x Harga Alat Baru C 15,540,764 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.33438 -

(1 + i)^A - 13. Biaya Pasti per Jam :

a. Biaya Pengembalian Modal = ( B - C ) x D E 23,384.32 Rupiah

W

b. Asuransi, dll = 0.002 x B F 155.41 Rupiah

W

Biaya Pasti per Jam = ( E + F ) G 23,539.73 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 14,175.00 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 7,200.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B K 9,712.98 Rupiah

perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 5,000.00 Rupiah

5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 3,928.57 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 40,016.55 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 63,556.28 Rupiah

E. LAIN - LAIN

1. Tingkat Suku Bunga i 20.00 % / Tahun2. Upah Operator / Sopir U1 5,000.00 Rp./Jam

3. Upah Pembantu Operator / Pmb.Sopir U2 3,928.57 Rp./Jam

4. Bahan Bakar Bensin Mb 1,810.00 Liter

5. Bahan Bakar Solar Ms 1,890.00 Liter

6. Minyak Pelumas Mp 12,000.00 Liter

File : 89627764.xls.ms_office 

Page 11: DIV. 9 PEK. HARIAN

8/2/2019 DIV. 9 PEK. HARIAN

http://slidepdf.com/reader/full/div-9-pek-harian 11/34

ITEM PEMBAYARAN No. : 9.14

JENIS PEKERJAAN : PEKERJAAN HARIAN

SATUAN PEMBAYARAN : JAM URAIAN ANALISA HARGA SATUAN

No. U R A I A N KODE KOEF. SATUAN KETERANGAN

A. URAIAN PERALATAN

1. Jenis Peralatan VIBRATORY ROLLER 5-8 T. (E19)

2. Tenaga Pw 60.0 HP

3. Kapasitas Cp 8.0 Ton

4. Umur Ekonomis A 4.0 Tahun Alat Baru

5. Jam Operasi Dalam 1 Tahun W 2,000 Jam Alat Baru6. Harga Alat B 197,409,699 Rupiah Alat Baru

B. BIAYA PASTI PER JAM KERJA

1. Nilai Sisa Alat = 10 % x Harga Alat Baru C 19,740,970 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.38629 -

(1 + i)^A - 13. Biaya Pasti per Jam :

a. Biaya Pengembalian Modal = ( B - C ) x D E 34,315.75 Rupiah

W

b. Asuransi, dll = 0.002 x B F 197.41 Rupiah

W

Biaya Pasti per Jam = ( E + F ) G 34,513.16 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 14,175.00 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 7,200.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B K 12,338.11 Rupiah

perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 5,000.00 Rupiah

5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 3,928.57 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 42,641.68 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 77,154.83 Rupiah

E. LAIN - LAIN

1. Tingkat Suku Bunga i 20.00 % / Tahun2. Upah Operator / Sopir U1 5,000.00 Rp./Jam

3. Upah Pembantu Operator / Pmb.Sopir U2 3,928.57 Rp./Jam

4. Bahan Bakar Bensin Mb 1,810.00 Liter

5. Bahan Bakar Solar Ms 1,890.00 Liter

6. Minyak Pelumas Mp 12,000.00 Liter

File : 89627764.xls.ms_office 

Page 12: DIV. 9 PEK. HARIAN

8/2/2019 DIV. 9 PEK. HARIAN

http://slidepdf.com/reader/full/div-9-pek-harian 12/34

ITEM PEMBAYARAN No. : 9.15

JENIS PEKERJAAN : PEKERJAAN HARIAN

SATUAN PEMBAYARAN : JAM URAIAN ANALISA HARGA SATUAN

No. U R A I A N KODE KOEF. SATUAN KETERANGAN

A. URAIAN PERALATAN

1. Jenis Peralatan VIBRATORY COMPACTOR (E25)

2. Tenaga Pw 5.0 HP

3. Kapasitas Cp 0.200 Ton

4. Umur Ekonomis A 4.0 Tahun Alat Baru

5. Jam Operasi Dalam 1 Tahun W 1,000 Jam Alat Baru6. Harga Alat B 6,720,330 Rupiah Alat Baru

B. BIAYA PASTI PER JAM KERJA

1. Nilai Sisa Alat = 10 % x Harga Alat Baru C 672,033 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.38629 -

(1 + i)^A - 13. Biaya Pasti per Jam :

a. Biaya Pengembalian Modal = ( B - C ) x D E 2,336.39 Rupiah

W

b. Asuransi, dll = 0.002 x B F 13.44 Rupiah

W

Biaya Pasti per Jam = ( E + F ) G 2,349.83 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 1,181.25 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 600.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B K 840.04 Rupiah

perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 5,000.00 Rupiah

5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 3,928.57 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 11,549.86 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 13,899.69 Rupiah

E. LAIN - LAIN

1. Tingkat Suku Bunga i 20.00 % / Tahun2. Upah Operator / Sopir U1 5,000.00 Rp./Jam

3. Upah Pembantu Operator / Pmb.Sopir U2 3,928.57 Rp./Jam

4. Bahan Bakar Bensin Mb 1,810.00 Liter

5. Bahan Bakar Solar Ms 1,890.00 Liter

6. Minyak Pelumas Mp 12,000.00 Liter

File : 89627764.xls.ms_office 

Page 13: DIV. 9 PEK. HARIAN

8/2/2019 DIV. 9 PEK. HARIAN

http://slidepdf.com/reader/full/div-9-pek-harian 13/34

ITEM PEMBAYARAN No. : 9.16

JENIS PEKERJAAN : PEKERJAAN HARIAN

SATUAN PEMBAYARAN : JAM URAIAN ANALISA HARGA SATUAN

No. U R A I A N KODE KOEF. SATUAN KETERANGAN

A. URAIAN PERALATAN

1. Jenis Peralatan TIRE ROLLER 8-10 T. (E18)

2. Tenaga Pw 60.0 HP

3. Kapasitas Cp 10.0 Ton

4. Umur Ekonomis A 5.0 Tahun Alat Baru

5. Jam Operasi Dalam 1 Tahun W 1,800 Jam Alat Baru6. Harga Alat B 176,408,667 Rupiah Alat Baru

B. BIAYA PASTI PER JAM KERJA

1. Nilai Sisa Alat = 10 % x Harga Alat Baru C 17,640,867 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.33438 -

(1 + i)^A - 13. Biaya Pasti per Jam :

a. Biaya Pengembalian Modal = ( B - C ) x D E 29,493.74 Rupiah

W

b. Asuransi, dll = 0.002 x B F 196.01 Rupiah

W

Biaya Pasti per Jam = ( E + F ) G 29,689.75 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 14,175.00 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 7,200.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B K 12,250.60 Rupiah

perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 5,000.00 Rupiah

5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 3,928.57 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 42,554.17 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 72,243.92 Rupiah

E. LAIN - LAIN

1. Tingkat Suku Bunga i 20.00 % / Tahun2. Upah Operator / Sopir U1 5,000.00 Rp./Jam

3. Upah Pembantu Operator / Pmb.Sopir U2 3,928.57 Rp./Jam

4. Bahan Bakar Bensin Mb 1,810.00 Liter

5. Bahan Bakar Solar Ms 1,890.00 Liter

6. Minyak Pelumas Mp 12,000.00 Liter

File : 89627764.xls.ms_office 

Page 14: DIV. 9 PEK. HARIAN

8/2/2019 DIV. 9 PEK. HARIAN

http://slidepdf.com/reader/full/div-9-pek-harian 14/34

ITEM PEMBAYARAN No. : 9.17

JENIS PEKERJAAN : PEKERJAAN HARIAN

SATUAN PEMBAYARAN : JAM URAIAN ANALISA HARGA SATUAN

No. U R A I A N KODE KOEF. SATUAN KETERANGAN

A. URAIAN PERALATAN

1. Jenis Peralatan COMPRESSOR 4000-6500 L\M (E05)

2. Tenaga Pw 80.0 HP

3. Kapasitas Cp - -

4. Umur Ekonomis A 5.0 Tahun Alat Baru

5. Jam Operasi Dalam 1 Tahun W 2,000 Jam Alat Baru6. Harga Alat B 54,602,683 Rupiah Alat Baru

B. BIAYA PASTI PER JAM KERJA

1. Nilai Sisa Alat = 10 % x Harga Alat Baru C 5,460,268 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.33438 -

(1 + i)^A - 13. Biaya Pasti per Jam :

a. Biaya Pengembalian Modal = ( B - C ) x D E 8,216.11 Rupiah

W

b. Asuransi, dll = 0.002 x B F 54.60 Rupiah

W

Biaya Pasti per Jam = ( E + F ) G 8,270.72 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 18,900.00 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 9,600.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B K 3,412.67 Rupiah

perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 5,000.00 Rupiah

5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 3,928.57 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 40,841.24 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 49,111.95 Rupiah

E. LAIN - LAIN

1. Tingkat Suku Bunga i 20.00 % / Tahun2. Upah Operator / Sopir U1 5,000.00 Rp./Jam

3. Upah Pembantu Operator / Pmb.Sopir U2 3,928.57 Rp./Jam

4. Bahan Bakar Bensin Mb 1,810.00 Liter

5. Bahan Bakar Solar Ms 1,890.00 Liter

6. Minyak Pelumas Mp 12,000.00 Liter

File : 89627764.xls.ms_office 

Page 15: DIV. 9 PEK. HARIAN

8/2/2019 DIV. 9 PEK. HARIAN

http://slidepdf.com/reader/full/div-9-pek-harian 15/34

ITEM PEMBAYARAN No. : 9.18

JENIS PEKERJAAN : PEKERJAAN HARIAN

SATUAN PEMBAYARAN : JAM URAIAN ANALISA HARGA SATUAN

No. U R A I A N KODE KOEF. SATUAN KETERANGAN

A. URAIAN PERALATAN

1. Jenis Peralatan CONCRETE MIXER 0.3-0.6 M3 (E06)

2. Tenaga Pw 15.0 HP

3. Kapasitas Cp 500.0 Liter

4. Umur Ekonomis A 4.0 Tahun Alat Baru

5. Jam Operasi Dalam 1 Tahun W 2,000 Jam Alat Baru6. Harga Alat B 117,605,778 Rupiah Alat Baru

B. BIAYA PASTI PER JAM KERJA

1. Nilai Sisa Alat = 10 % x Harga Alat Baru C 11,760,578 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.38629 -

(1 + i)^A - 13. Biaya Pasti per Jam :

a. Biaya Pengembalian Modal = ( B - C ) x D E 20,443.42 Rupiah

W

b. Asuransi, dll = 0.002 x B F 117.61 Rupiah

W

Biaya Pasti per Jam = ( E + F ) G 20,561.03 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 3,543.75 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 1,800.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B K 7,350.36 Rupiah

perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 5,000.00 Rupiah

5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 3,928.57 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 21,622.68 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 42,183.71 Rupiah

E. LAIN - LAIN

1. Tingkat Suku Bunga i 20.00 % / Tahun2. Upah Operator / Sopir U1 5,000.00 Rp./Jam

3. Upah Pembantu Operator / Pmb.Sopir U2 3,928.57 Rp./Jam

4. Bahan Bakar Bensin Mb 1,810.00 Liter

5. Bahan Bakar Solar Ms 1,890.00 Liter

6. Minyak Pelumas Mp 12,000.00 Liter

File : 89627764.xls.ms_office 

Page 16: DIV. 9 PEK. HARIAN

8/2/2019 DIV. 9 PEK. HARIAN

http://slidepdf.com/reader/full/div-9-pek-harian 16/34

ITEM PEMBAYARAN No. : 9.19

JENIS PEKERJAAN : PEKERJAAN HARIAN

SATUAN PEMBAYARAN : JAM URAIAN ANALISA HARGA SATUAN

No. U R A I A N KODE KOEF. SATUAN KETERANGAN

A. URAIAN PERALATAN

1. Jenis Peralatan WATER PUMP 70-100 mm (E22)

2. Tenaga Pw 6.0 HP

3. Kapasitas Cp - -

4. Umur Ekonomis A 2.0 Tahun Alat Baru

5. Jam Operasi Dalam 1 Tahun W 2,000 Jam Alat Baru6. Harga Alat B 9,450,464 Rupiah Alat Baru

B. BIAYA PASTI PER JAM KERJA

1. Nilai Sisa Alat = 10 % x Harga Alat Baru C 945,046 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.65455 -

(1 + i)^A - 13. Biaya Pasti per Jam :

a. Biaya Pengembalian Modal = ( B - C ) x D E 2,783.59 Rupiah

W

b. Asuransi, dll = 0.002 x B F 9.45 Rupiah

W

Biaya Pasti per Jam = ( E + F ) G 2,793.04 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 1,417.50 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 720.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B K 590.65 Rupiah

perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 5,000.00 Rupiah

5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 3,928.57 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 11,656.72 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 14,449.77 Rupiah

E. LAIN - LAIN

1. Tingkat Suku Bunga i 20.00 % / Tahun2. Upah Operator / Sopir U1 5,000.00 Rp./Jam

3. Upah Pembantu Operator / Pmb.Sopir U2 3,928.57 Rp./Jam

4. Bahan Bakar Bensin Mb 1,810.00 Liter

5. Bahan Bakar Solar Ms 1,890.00 Liter

6. Minyak Pelumas Mp 12,000.00 Liter

File : 89627764.xls.ms_office 

Page 17: DIV. 9 PEK. HARIAN

8/2/2019 DIV. 9 PEK. HARIAN

http://slidepdf.com/reader/full/div-9-pek-harian 17/34

ITEM PEMBAYARAN No. : 9.20

JENIS PEKERJAAN : PEKERJAAN HARIAN

SATUAN PEMBAYARAN : JAM URAIAN ANALISA HARGA SATUAN

No. U R A I A N KODE KOEF. SATUAN KETERANGAN

A. URAIAN PERALATAN

1. Jenis Peralatan JACK HAMMER E26

2. Tenaga Pw 3.0 HP

3. Kapasitas Cp - -

4. Umur Ekonomis A 4.0 Tahun Alat Baru

5. Jam Operasi Dalam 1 Tahun W 1,000 Jam Alat Baru6. Harga Alat B 27,721,362 Rupiah Alat Baru

B. BIAYA PASTI PER JAM KERJA

1. Nilai Sisa Alat = 10 % x Harga Alat Baru C 2,772,136 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.38629 -

(1 + i)^A - 13. Biaya Pasti per Jam :

a. Biaya Pengembalian Modal = ( B - C ) x D E 9,637.61 Rupiah

W

b. Asuransi, dll = 0.002 x B F 55.44 Rupiah

W

Biaya Pasti per Jam = ( E + F ) G 9,693.06 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 708.75 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 360.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B K 3,465.17 Rupiah

perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 5,000.00 Rupiah

5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 3,928.57 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 13,462.49 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 23,155.55 Rupiah

E. LAIN - LAIN

1. Tingkat Suku Bunga i 20.00 % / Tahun2. Upah Operator / Sopir U1 5,000.00 Rp./Jam

3. Upah Pembantu Operator / Pmb.Sopir U2 3,928.57 Rp./Jam

4. Bahan Bakar Bensin Mb 1,810.00 Liter

5. Bahan Bakar Solar Ms 1,890.00 Liter

6. Minyak Pelumas Mp 12,000.00 Liter

File : 89627764.xls.ms_office 

Page 18: DIV. 9 PEK. HARIAN

8/2/2019 DIV. 9 PEK. HARIAN

http://slidepdf.com/reader/full/div-9-pek-harian 18/34

FORMULIR STANDAR UNTUKPEREKAMAN ANALISA MASING-MASING HARGA SATUAN

 

PROYEK :

No. PAKET KONTRAK :NAMA PAKET :

PROP / KAB / KODYA :

ITEM PEMBAYARAN NO. : 9.4 PERKIRAAN VOL. PEK. : 140.00

JENIS PEKERJAAN : PEKERJAAN HARIAN TOTAL HARGA (Rp.) : 9,906,118.60

DUMP TRUCK 3-4 M3 % THD. BIAYA PROYEK : 0.03

SATUAN PEMBAYARAN : JAM (E08)

PERKIRAAN HARGA JUMLAH

NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. PEKERJA

1. - - - -

2. - - - -

B. BAHAN

1. - - - -

2. - - - -

C. ALAT

1. DUMP TRUCK 3-4 M3 jam 1.0000 85,663.03 85,663.03

2. - jam - - -

D. JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) 85,663.03

E. OVERHEAD & PROFIT 10.0 % x D 8,566.30

F. HARGA SATUAN PEKERJAAN ( D + E ) 94,229.33

Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/ata

berat untuk bahan-bahan.

2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan

mata pembayaran.

3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak terma

yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-94

File : 89627764.xls.ms_office 

Page 19: DIV. 9 PEK. HARIAN

8/2/2019 DIV. 9 PEK. HARIAN

http://slidepdf.com/reader/full/div-9-pek-harian 19/34

FORMULIR STANDAR UNTUKPEREKAMAN ANALISA MASING-MASING HARGA SATUAN

 

PROYEK :

No. PAKET KONTRAK :NAMA PAKET :

PROP / KAB / KODYA :

ITEM PEMBAYARAN NO. : 9.5 PERKIRAAN VOL. PEK. : 140.00

JENIS PEKERJAAN : PEKERJAAN HARIAN TOTAL HARGA (Rp.) : 11,692,891.00

FLAT BED TRUCK 3-4 M3 % THD. BIAYA PROYEK : 0.04

SATUAN PEMBAYARAN : JAM (E11)

PERKIRAAN HARGA JUMLAH

NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. PEKERJA

1. - - - -

2. - - - -

B. BAHAN

1. - - - -

2. - - - -

C. ALAT

1. FLAT BED TRUCK 3-4 M3  jam 1.0000 75,927.86 75,927.86

2. - jam - - -

D. JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) 75,927.86E. OVERHEAD & PROFIT 10.0 % x D 7,592.79F. HARGA SATUAN PEKERJAAN ( D + E ) 83,520.65

Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/ata

berat untuk bahan-bahan.

2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan

mata pembayaran.

3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak terma

yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-95

File : 89627764.xls.ms_office 

Page 20: DIV. 9 PEK. HARIAN

8/2/2019 DIV. 9 PEK. HARIAN

http://slidepdf.com/reader/full/div-9-pek-harian 20/34

FORMULIR STANDAR UNTUK

PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

 

PROYEK :

No. PAKET KONTRAK :NAMA PAKET :

PROP / KAB / KODYA :

ITEM PEMBAYARAN NO. : 9.6 PERKIRAAN VOL. PEK. : 70.00

JENIS PEKERJAAN : PEKERJAAN HARIAN TOTAL HARGA (Rp.) : 5,846,445.50

WATER TANKER 3000-4500 L. % THD. BIAYA PROYEK : 0.02

SATUAN PEMBAYARAN : JAM (E23)

PERKIRAAN HARGA JUMLAH

NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. PEKERJA

1. - - - -

2. - - - -

B. BAHAN

1. - - - -

2. - - - -

C. ALAT

1. WATER TANKER 3000-4500 L.  jam 1.0000 75,927.86 75,927.86

2. - jam - - -

D. JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) 75,927.86E. OVERHEAD & PROFIT 10.0 % x D 7,592.79F. HARGA SATUAN PEKERJAAN ( D + E ) 83,520.65

Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/ata

berat untuk bahan-bahan.

2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan

mata pembayaran.

3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.

4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak terma

yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-96

File : 89627764.xls.ms_office 

Page 21: DIV. 9 PEK. HARIAN

8/2/2019 DIV. 9 PEK. HARIAN

http://slidepdf.com/reader/full/div-9-pek-harian 21/34

FORMULIR STANDAR UNTUKPEREKAMAN ANALISA MASING-MASING HARGA SATUAN

 

PROYEK :

No. PAKET KONTRAK :NAMA PAKET :

PROP / KAB / KODYA :

ITEM PEMBAYARAN NO. : 9.7 PERKIRAAN VOL. PEK. : 70.00

JENIS PEKERJAAN : PEKERJAAN HARIAN TOTAL HARGA (Rp.) : 14,216,095.60

BULLDOZER 100-150 HP % THD. BIAYA PROYEK : 0.05

SATUAN PEMBAYARAN : JAM (E04)

PERKIRAAN HARGA JUMLAH

NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. PEKERJA

1. - - - -

2. - - - -

B. BAHAN

1. - - - -

2. - - - -

C. ALAT

1. BULLDOZER 100-150 HP  jam 1.0000 184,624.62 184,624.62

2. - jam - - -

D. JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) 184,624.62E. OVERHEAD & PROFIT 10.0 % x D 18,462.46F. HARGA SATUAN PEKERJAAN ( D + E ) 203,087.08

Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/ata

berat untuk bahan-bahan.

2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan

mata pembayaran.

3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak terma

yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-97

File : 89627764.xls.ms_office 

Page 22: DIV. 9 PEK. HARIAN

8/2/2019 DIV. 9 PEK. HARIAN

http://slidepdf.com/reader/full/div-9-pek-harian 22/34

FORMULIR STANDAR UNTUKPEREKAMAN ANALISA MASING-MASING HARGA SATUAN

 

PROYEK :

No. PAKET KONTRAK :NAMA PAKET :

PROP / KAB / KODYA :

ITEM PEMBAYARAN NO. : 9.8 PERKIRAAN VOL. PEK. : 70.00

JENIS PEKERJAAN : PEKERJAAN HARIAN TOTAL HARGA (Rp.) : 11,105,765.30

MOTOR GRADER >100 HP % THD. BIAYA PROYEK : 0.04

SATUAN PEMBAYARAN : JAM (E13)

PERKIRAAN HARGA JUMLAH

NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. PEKERJA

1. - - - -

2. - - - -

B. BAHAN

1. - - - -

2. - - - -

C. ALAT

1. MOTOR GRADER >100 HP  jam 1.0000 144,230.72 144,230.72

2. - jam - - -

D. JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) 144,230.72E. OVERHEAD & PROFIT 10.0 % x D 14,423.07F. HARGA SATUAN PEKERJAAN ( D + E ) 158,653.79

Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/ata

berat untuk bahan-bahan.

2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan

mata pembayaran.

3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak terma

yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-98

File : 89627764.xls.ms_office 

Page 23: DIV. 9 PEK. HARIAN

8/2/2019 DIV. 9 PEK. HARIAN

http://slidepdf.com/reader/full/div-9-pek-harian 23/34

FORMULIR STANDAR UNTUKPEREKAMAN ANALISA MASING-MASING HARGA SATUAN

 

PROYEK :

No. PAKET KONTRAK :NAMA PAKET :

PROP / KAB / KODYA :

ITEM PEMBAYARAN NO. : 9.9 PERKIRAAN VOL. PEK. : 70.00

JENIS PEKERJAAN : PEKERJAAN HARIAN TOTAL HARGA (Rp.) : 10,690,556.06

WHEEL LOADER 1.0-1.6 M3 % THD. BIAYA PROYEK : 0.04

SATUAN PEMBAYARAN : JAM (E15)

PERKIRAAN HARGA JUMLAH

NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. PEKERJA

1. - - - -

2. - - - -

B. BAHAN

1. - - - -

2. - - - -

C. ALAT

1. WHEEL LOADER 1.0-1.6 M3  jam 1.0000 138,838.39 138,838.39

2. - jam - - -

D. JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) 138,838.39E. OVERHEAD & PROFIT 10.0 % x D 13,883.84

F. HARGA SATUAN PEKERJAAN ( D + E ) 152,722.23

Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/ata

berat untuk bahan-bahan.

2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan

mata pembayaran.

3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.

4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak terma

yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-99

File : 89627764.xls.ms_office 

Page 24: DIV. 9 PEK. HARIAN

8/2/2019 DIV. 9 PEK. HARIAN

http://slidepdf.com/reader/full/div-9-pek-harian 24/34

FORMULIR STANDAR UNTUKPEREKAMAN ANALISA MASING-MASING HARGA SATUAN

 

PROYEK :

No. PAKET KONTRAK :NAMA PAKET :

PROP / KAB / KODYA :

ITEM PEMBAYARAN NO. : 9.10 PERKIRAAN VOL. PEK. : 70.00

JENIS PEKERJAAN : PEKERJAAN HARIAN TOTAL HARGA (Rp.) : 11,597,658.10

TRACK LOADER 75-100 HP % THD. BIAYA PROYEK : 0.04

SATUAN PEMBAYARAN : JAM (E14)

PERKIRAAN HARGA JUMLAH

NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. PEKERJA

1. - - - -

2. - - - -

B. BAHAN

1. - - - -

2. - - - -

C. ALAT

1. TRACK LOADER 75-100 HP  jam 1.0000 150,618.94 150,618.94

2. - jam - - -

D. JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) 150,618.94E. OVERHEAD & PROFIT 10.0 % x D 15,061.89

F. HARGA SATUAN PEKERJAAN ( D + E ) 165,680.83

Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/ata

berat untuk bahan-bahan.

2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan

mata pembayaran.

3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak terma

yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-910

File : 89627764.xls.ms_office 

Page 25: DIV. 9 PEK. HARIAN

8/2/2019 DIV. 9 PEK. HARIAN

http://slidepdf.com/reader/full/div-9-pek-harian 25/34

FORMULIR STANDAR UNTUKPEREKAMAN ANALISA MASING-MASING HARGA SATUAN

 

PROYEK :

No. PAKET KONTRAK :NAMA PAKET :

PROP / KAB / KODYA :

ITEM PEMBAYARAN NO. : 9.11 PERKIRAAN VOL. PEK. : 70.00

JENIS PEKERJAAN : PEKERJAAN HARIAN TOTAL HARGA (Rp.) : 11,186,189.00

EXCAVATOR 80-140 HP % THD. BIAYA PROYEK : 0.04

SATUAN PEMBAYARAN : JAM (E10)

PERKIRAAN HARGA JUMLAH

NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. PEKERJA

1. - - - -

2. - - - -

B. BAHAN

1. - - - -

2. - - - -

C. ALAT

1. EXCAVATOR 80-140 HP  jam 1.0000 145,275.19 145,275.19

2. - jam - - -

D. JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) 145,275.19E. OVERHEAD & PROFIT 10.0 % x D 14,527.52

F. HARGA SATUAN PEKERJAAN ( D + E ) 159,802.70

Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/ata

berat untuk bahan-bahan.

2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan

mata pembayaran.

3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.

4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak terma

yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-911

File : 89627764.xls.ms_office 

Page 26: DIV. 9 PEK. HARIAN

8/2/2019 DIV. 9 PEK. HARIAN

http://slidepdf.com/reader/full/div-9-pek-harian 26/34

FORMULIR STANDAR UNTUKPEREKAMAN ANALISA MASING-MASING HARGA SATUAN

 

PROYEK :

No. PAKET KONTRAK :NAMA PAKET :

PROP / KAB / KODYA :

ITEM PEMBAYARAN NO. : 9.12 PERKIRAAN VOL. PEK. : 70.00

JENIS PEKERJAAN : PEKERJAAN HARIAN TOTAL HARGA (Rp.) : 17,604,479.20

CRANE 10-15 TON % THD. BIAYA PROYEK : 0.06

SATUAN PEMBAYARAN : JAM (E07)

PERKIRAAN HARGA JUMLAH

NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. PEKERJA

1. - - - -

2. - - - -

B. BAHAN

1. - - - -

2. - - - -

C. ALAT

1. CRANE 10-15 TON jam 1.0000 228,629.60 228,629.60

2. - jam - - -

D. JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) 228,629.60

E. OVERHEAD & PROFIT 10.0 % x D 22,862.96F. HARGA SATUAN PEKERJAAN ( D + E ) 251,492.56

Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/ata

berat untuk bahan-bahan.

2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan

mata pembayaran.

3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.

4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak terma

yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-912

File : 89627764.xls.ms_office 

Page 27: DIV. 9 PEK. HARIAN

8/2/2019 DIV. 9 PEK. HARIAN

http://slidepdf.com/reader/full/div-9-pek-harian 27/34

FORMULIR STANDAR UNTUK

PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

 

PROYEK :

No. PAKET KONTRAK :NAMA PAKET :

PROP / KAB / KODYA :

ITEM PEMBAYARAN NO. : 9.13 PERKIRAAN VOL. PEK. : 70.00

JENIS PEKERJAAN : PEKERJAAN HARIAN TOTAL HARGA (Rp.) : 4,893,833.00

STEEL WHEEL ROLLER 6-9 T. % THD. BIAYA PROYEK : 0.02

SATUAN PEMBAYARAN : JAM (E16)

PERKIRAAN HARGA JUMLAH

NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. PEKERJA

1. - - - -

2. - - - -

B. BAHAN

1. - - - -

2. - - - -

C. ALAT

1. STEEL WHEEL ROLLER 6-9 T.  jam 1.0000 63,556.28 63,556.28

2. - jam - - -

D. JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) 63,556.28E. OVERHEAD & PROFIT 10.0 % x D 6,355.63

F. HARGA SATUAN PEKERJAAN ( D + E ) 69,911.90

Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/ata

berat untuk bahan-bahan.

2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan

mata pembayaran.

3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.

4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak terma

yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-913

File : 89627764.xls.ms_office 

Page 28: DIV. 9 PEK. HARIAN

8/2/2019 DIV. 9 PEK. HARIAN

http://slidepdf.com/reader/full/div-9-pek-harian 28/34

FORMULIR STANDAR UNTUK

PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

 

PROYEK :

No. PAKET KONTRAK :NAMA PAKET :

PROP / KAB / KODYA :

ITEM PEMBAYARAN NO. : 9.14 PERKIRAAN VOL. PEK. : 70.00

JENIS PEKERJAAN : PEKERJAAN HARIAN TOTAL HARGA (Rp.) : 5,940,922.40

VIBRATORY ROLLER 5-8 T. % THD. BIAYA PROYEK : 0.02

SATUAN PEMBAYARAN : JAM (E19)

PERKIRAAN HARGA JUMLAH

NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. PEKERJA

1. - - - -

2. - - - -

B. BAHAN

1. - - - -

2. - - - -

C. ALAT

1. VIBRATORY ROLLER 5-8 T.  jam 1.0000 77,154.83 77,154.83

2. - jam - - -

D. JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) 77,154.83E. OVERHEAD & PROFIT 10.0 % x D 7,715.48F. HARGA SATUAN PEKERJAAN ( D + E ) 84,870.32

Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/ata

berat untuk bahan-bahan.

2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan

mata pembayaran.

3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak terma

yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-914

File : 89627764.xls.ms_office 

Page 29: DIV. 9 PEK. HARIAN

8/2/2019 DIV. 9 PEK. HARIAN

http://slidepdf.com/reader/full/div-9-pek-harian 29/34

FORMULIR STANDAR UNTUK

PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

 

PROYEK :

No. PAKET KONTRAK :NAMA PAKET :

PROP / KAB / KODYA :

ITEM PEMBAYARAN NO. : 9.15 PERKIRAAN VOL. PEK. : 70.00

JENIS PEKERJAAN : PEKERJAAN HARIAN TOTAL HARGA (Rp.) : 1,070,276.20

VIBRATORY COMPACTOR % THD. BIAYA PROYEK : 0.00

SATUAN PEMBAYARAN : JAM (E25)

PERKIRAAN HARGA JUMLAH

NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. PEKERJA

1. - - - -

2. - - - -

B. BAHAN

1. - - - -

2. - - - -

C. ALAT

1. VIBRATORY COMPACTOR  jam 1.0000 13,899.69 13,899.69

2. - jam - - -

D. JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) 13,899.69E. OVERHEAD & PROFIT 10.0 % x D 1,389.97

F. HARGA SATUAN PEKERJAAN ( D + E ) 15,289.66

Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/ata

berat untuk bahan-bahan.

2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan

mata pembayaran.

3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.

4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak terma

yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-915

File : 89627764.xls.ms_office 

Page 30: DIV. 9 PEK. HARIAN

8/2/2019 DIV. 9 PEK. HARIAN

http://slidepdf.com/reader/full/div-9-pek-harian 30/34

FORMULIR STANDAR UNTUKPEREKAMAN ANALISA MASING-MASING HARGA SATUAN

 

PROYEK :

No. PAKET KONTRAK :NAMA PAKET :

PROP / KAB / KODYA :

ITEM PEMBAYARAN NO. : 9.16 PERKIRAAN VOL. PEK. : 70.00

JENIS PEKERJAAN : PEKERJAAN HARIAN TOTAL HARGA (Rp.) : 5,562,781.70

TIRE ROLLER 8-10 T. % THD. BIAYA PROYEK : 0.02

SATUAN PEMBAYARAN : JAM (E18)

PERKIRAAN HARGA JUMLAH

NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. PEKERJA

1. - - - -

2. - - - -

B. BAHAN

1. - - - -

2. - - - -

C. ALAT

1. TIRE ROLLER 8-10 T. jam 1.0000 72,243.92 72,243.92

2. - jam - - -

D. JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) 72,243.92

E. OVERHEAD & PROFIT 10.0 % x D 7,224.39F. HARGA SATUAN PEKERJAAN ( D + E ) 79,468.31

Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/ata

berat untuk bahan-bahan.

2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan

mata pembayaran.

3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.

4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak terma

yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-916

File : 89627764.xls.ms_office 

Page 31: DIV. 9 PEK. HARIAN

8/2/2019 DIV. 9 PEK. HARIAN

http://slidepdf.com/reader/full/div-9-pek-harian 31/34

FORMULIR STANDAR UNTUK

PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

 

PROYEK :

No. PAKET KONTRAK :NAMA PAKET :

PROP / KAB / KODYA :

ITEM PEMBAYARAN NO. : 9.17 PERKIRAAN VOL. PEK. : 49.00

JENIS PEKERJAAN : PEKERJAAN HARIAN TOTAL HARGA (Rp.) : 2,647,134.35

COMPRESSOR 4000-6500 L\M % THD. BIAYA PROYEK : 0.01

SATUAN PEMBAYARAN : JAM (E05)

PERKIRAAN HARGA JUMLAH

NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. PEKERJA

1. - - - -

2. - - - -

B. BAHAN

1. - - - -

2. - - - -

C. ALAT

1. COMPRESSOR 4000-6500 L\M  jam 1.0000 49,111.95 49,111.95

2. - jam - - -

D. JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) 49,111.95E. OVERHEAD & PROFIT 10.0 % x D 4,911.20

F. HARGA SATUAN PEKERJAAN ( D + E ) 54,023.15

Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/ata

berat untuk bahan-bahan.

2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan

mata pembayaran.

3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak terma

yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-917

File : 89627764.xls.ms_office 

Page 32: DIV. 9 PEK. HARIAN

8/2/2019 DIV. 9 PEK. HARIAN

http://slidepdf.com/reader/full/div-9-pek-harian 32/34

FORMULIR STANDAR UNTUK

PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

 

PROYEK :

No. PAKET KONTRAK :NAMA PAKET :

PROP / KAB / KODYA :

ITEM PEMBAYARAN NO. : 9.18 PERKIRAAN VOL. PEK. : 49.00

JENIS PEKERJAAN : PEKERJAAN HARIAN TOTAL HARGA (Rp.) : 2,273,701.92

CONCRETE MIXER 0.3-0.6 M3 % THD. BIAYA PROYEK : 0.01

SATUAN PEMBAYARAN : JAM (E06)

PERKIRAAN HARGA JUMLAH

NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. PEKERJA

1. - - - -

2. - - - -

B. BAHAN

1. - - - -

2. - - - -

C. ALAT

1. CONCRETE MIXER 0.3-0.6 M3  jam 1.0000 42,183.71 42,183.71

2. - jam - - -

D. JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) 42,183.71E. OVERHEAD & PROFIT 10.0 % x D 4,218.37

F. HARGA SATUAN PEKERJAAN ( D + E ) 46,402.08

Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/ata

berat untuk bahan-bahan.

2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan

mata pembayaran.

3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.

4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak terma

yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-918

File : 89627764.xls.ms_office 

Page 33: DIV. 9 PEK. HARIAN

8/2/2019 DIV. 9 PEK. HARIAN

http://slidepdf.com/reader/full/div-9-pek-harian 33/34

FORMULIR STANDAR UNTUKPEREKAMAN ANALISA MASING-MASING HARGA SATUAN

 

PROYEK :

No. PAKET KONTRAK :NAMA PAKET :

PROP / KAB / KODYA :

ITEM PEMBAYARAN NO. : 9.19 PERKIRAAN VOL. PEK. : 49.00

JENIS PEKERJAAN : PEKERJAAN HARIAN TOTAL HARGA (Rp.) : 778,842.26

WATER PUMP 70-100 mm % THD. BIAYA PROYEK : 0.00

SATUAN PEMBAYARAN : JAM (E22)

PERKIRAAN HARGA JUMLAH

NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. PEKERJA

1. - - - -

2. - - - -

B. BAHAN

1. - - - -

2. - - - -

C. ALAT

1. WATER PUMP 70-100 mm  jam 1.0000 14,449.77 14,449.77

2. - jam - - -

D. JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) 14,449.77E. OVERHEAD & PROFIT 10.0 % x D 1,444.98F. HARGA SATUAN PEKERJAAN ( D + E ) 15,894.74

Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/ata

berat untuk bahan-bahan.

2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan

mata pembayaran.

3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak terma

yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-919

File : 89627764.xls.ms_office 

Page 34: DIV. 9 PEK. HARIAN

8/2/2019 DIV. 9 PEK. HARIAN

http://slidepdf.com/reader/full/div-9-pek-harian 34/34

FORMULIR STANDAR UNTUKPEREKAMAN ANALISA MASING-MASING HARGA SATUAN

 

PROYEK :

No. PAKET KONTRAK :NAMA PAKET :

PROP / KAB / KODYA :

ITEM PEMBAYARAN NO. : 9.20 PERKIRAAN VOL. PEK. : 0.00

JENIS PEKERJAAN : PEKERJAAN HARIAN TOTAL HARGA (Rp.) : 778,842.26

JACK HAMMER % THD. BIAYA PROYEK : 0.00

SATUAN PEMBAYARAN : JAM E26

PERKIRAAN HARGA JUMLAH

NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. PEKERJA

1. - - - -

2. - - - -

B. BAHAN

1. - - - -

2. - - - -

C. ALAT

1. JACK HAMMER  jam 1.0000 23,155.55 23,155.55

2. - jam - - -

D. JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) 23,155.55

E. OVERHEAD & PROFIT 10.0 % x D 2,315.55F. HARGA SATUAN PEKERJAAN ( D + E ) 25,471.10

Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/ata

berat untuk bahan-bahan.

2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan

mata pembayaran.

3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.

4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak terma

yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-920