1. Rev Pek Persiapan

21
TABEL ANALISA HARGA SATUAN No. Uraian Jenis pekerjaan Sat. Koeff. Harga Sat. Bahan / Upah Rp. 1 2 3 4 5 A ANALISA BIAYA KONSTRUKSI PEKERJAAN PERSIAPAN A.1 1 m2 PEMBERSIHAN &PERATAAN TANAH Tenaga kerja : Pekerja Oh 0.100 45,400.00 Mandor Oh 0.050 59,400.00 Jumlah A.2 1 M PAS. BOUWPLANK & PENGUKURAN Bahan : Kayu Borneo 5/7 M3 0,007 4.050,000,00 Paku Biasa 2" - 5" Kg 0,020 17,210.00 Kayu Papan Albasia M3 0,007 1,594,333.00 Tenaga Kerja : Pekerja Oh 0,100 45,400.00 Tukang Kayu Oh 0,100 55,900.00 Kepala Tukang Kayu Oh 0,010 61,000.00 Mandor Oh 0,005 59,400.00 Jumlah A3 1 M' PAGAR SEMENTARA DARI SENG GELOMBANG, T = 2m Bahan : Dolken kayu dia 8 - 10/400 Btg 1.2500 26,990.00 Semen Portland Kg 2.5000 1,303.14 Seng Gelombang Lbr 1.2000 48,625.00 Pasir Beton M3 0.0050 193,000.00 Koral Beton M3 0.0090 195,120.00 Kayu Borneo 5/7 M3 0.0720 4,050,000.00 Paku Biasa 2" - 5" Kg 0.0600 17,210.00 Meni Besi Kg 0.4500 20,250.00 Tenaga Kerja : Pekerja Oh 0.4000 45,400.00 Tukang Kayu Oh 0.2000 55,900.00 Kepala Tukang Kayu Oh 0.0200 61,000.00 Mandor Oh 0.0200 59,400.00 Jumlah A.4 1 M2 PEMB. DIREKSI KEET DENGAN LANTAI PLESTER Bahan : Kayu dolkenø 8 -10/400 cm Btg 1.25 26,990.00 Kayu Papan Albasia M3 0,180 1,594,333.00 Paku Biasa 2" - 5" Kg 0,850 17,210.00 Besi strip Kg 1.1 50,000.00

Transcript of 1. Rev Pek Persiapan

Page 1: 1. Rev Pek Persiapan

TABEL

ANALISA HARGA SATUAN

No. Uraian Jenis pekerjaan Sat. Koeff. Harga Sat. Jumlah HargaBahan / Upah Bahan

Rp. Rp.

1 2 3 4 5 6A ANALISA BIAYA KONSTRUKSI PEKERJAAN PERSIAPAN

A.1 1 m2 PEMBERSIHAN &PERATAAN TANAH Tenaga kerja :Pekerja Oh 0.100 45,400.00 -Mandor Oh 0.050 59,400.00 -Jumlah 0

A.2 1 M PAS. BOUWPLANK & PENGUKURAN Bahan :Kayu Borneo 5/7 M3 0,007 4.050,000,00 28,350.00Paku Biasa 2" - 5" Kg 0,020 17,210.00 344.20Kayu Papan Albasia M3 0,007 1,594,333.00 11,160.33Tenaga Kerja :Pekerja Oh 0,100 45,400.00 -Tukang Kayu Oh 0,100 55,900.00 -Kepala Tukang Kayu Oh 0,010 61,000.00 -Mandor Oh 0,005 59,400.00 -Jumlah 39,854.53

A3 1 M' PAGAR SEMENTARA DARI SENG GELOMBANG, T = 2m Bahan :Dolken kayu dia 8 - 10/400 cm Btg 1.2500 26,990.00 33,737.50 Semen Portland Kg 2.5000 1,303.14 3,257.85 Seng Gelombang Lbr 1.2000 48,625.00 58,350.00 Pasir Beton M3 0.0050 193,000.00 965.00 Koral Beton M3 0.0090 195,120.00 1,756.08 Kayu Borneo 5/7 M3 0.0720 4,050,000.00 291,600.00 Paku Biasa 2" - 5" Kg 0.0600 17,210.00 1,032.60 Meni Besi Kg 0.4500 20,250.00 9,112.50 Tenaga Kerja :Pekerja Oh 0.4000 45,400.00 - Tukang Kayu Oh 0.2000 55,900.00 - Kepala Tukang Kayu Oh 0.0200 61,000.00 -

Mandor Oh 0.0200 59,400.00 -

Jumlah 399,811.53

A.4 1 M2 PEMB. DIREKSI KEET DENGAN LANTAI PLESTER Bahan :Kayu dolkenø 8 -10/400 cm Btg 1.25 26,990.00 33,737.50 Kayu Papan Albasia M3 0,180 1,594,333.00 286,979.94 Paku Biasa 2" - 5" Kg 0,850 17,210.00 14,628.50 Besi strip Kg 1.1 50,000.00 55,000.00 Semen Portland Kg 35 1,303.14 45,609.00 Pasir Pasang M3 0,150 119,167.00 17,875.05 Pasir Beton M3 0,100 193,000.00 19,300.00

Page 2: 1. Rev Pek Persiapan

A.4

Koral beton M3 0,150 195,120.00 29,268.00 Bata merah Bh 30 612.00 18,360.00 Seng Plat, BJLS 25 Lbr 0,250 48,625.00 12,156.25 Jendela nako Bh 2 123,750.00 247,500.00 Kasa polos M2 0,080 121,000.00 9,680.00 Kunci Tanam Bh 0,150 55,000.00 8,250.00 Plywood 4mm Lbr 0,060 58,300.00 3,498.00 Tenaga Kerja :Pekerja Oh 1 45,400.00 -Tukang Kayu Oh 1.5 55,900.00 -Tukang Batu Oh 1 54,200.00 -Kepala Tukang Kayu Oh 0,300 61,000.00 -Mandor Oh 0,050 59,400.00 -Jumlah 801,842.24

A5 1 m2 PEMB.LOS KERJA Bahan :Kayu dolken dia 8 - 10/400 cm Btg 1.2000 26,990.00 32,388.00 Kayu Albasia 5/7 M3 0.1400 1,594,333.00 223,206.62 Paku Biasa 2" - 5" Kg 0.3000 17,210.00 5,163.00 triplek 4mm Lbr 1.2000 55,000.00 66,000.00 Seng Gelombang, BJLS 25 Lbr 1.0000 48,625.00 48,625.00 Tenaga Kerja : - Pekerja Oh 1.0000 45,400.00 Tukang Kayu Oh 1.2000 55,900.00 - Kepala Tukang Kayu Oh 0.1200 61,000.00 - Mandor Oh 0.0500 59,400.00 - Jumlah 375,382.62

A.6 1M2 PEMB. PAPAN NAMA PROYEK1 M2 PAPAN NAMA PROYEKBahanpapan albasia 2/20 M3 0.1800 1,594,333.00 286979.94kayu albasia 5/7 m3 0.0600 1,594,333.00 95659.98Paku biasa 2", 5" Kg 0.2500 17,210.00 4302.5Cat kayu seiv ltr 1.0000 39,430.00 39430Tenaga KerjaPekerja Oh 0.10 45,400.00Jumlah 426,372.42

Page 3: 1. Rev Pek Persiapan

TABEL

ANALISA HARGA SATUAN

Jumlah Harga Upah Bahan + UpahRp. Rp.

7 8

4,540.002,970.007,510.00 7,510.00

---

4,540.00 5,590.00 610.00 297.00 11,037.00 50,891.53

--------

18,160.00 11,180.00 1,220.00

1,188.00

31,748.00 431,559.53

-------

Page 4: 1. Rev Pek Persiapan

-------

45,400.00 83,850.00 54,200.00 18,300.00 2,970.00

204720 1,006,562.24

- - - - - -

45,400.00 67,080.00 7,320.00 2,970.00 122,770.00 498,152.62

4,540.004,540.00 430,912.42

Page 5: 1. Rev Pek Persiapan

TABEL 1

RENCANA ANGGARAN BIAYA UPAH PEKERJAAN PERSIAPAN

NO URAIAN PEKERJAAN VOL SAT HARGA SATUAN

UPAH

1 2 3 4 6

A. PEKERJAAN PERSIAPANA.1 1 m2 PEMBERSIHAN &PERATAAN TANAH 326 M2 Rp 7,510.00 A.2 1 M PAS. BOUWPLANK & PENGUKURAN 72.6 M' Rp 11,037.00 A.3 1 M' PAGAR SEMENTARA DARI SENG GELOMBANG, T = 2m 32.6 M' Rp 31,748.00 A.4 1 M2 PEMB. DIREKSI KEET DENGAN LANTAI PLESTER 16 M2 Rp 204,720.00 A.5 1 m2 PEMB.LOS KERJA 9 M2 Rp 122,770.00 A.6 1M2 PEMB. PAPAN NAMA PROYEK 1.5 M2 Rp 4,540.00

JUMLAH

RENCANA ANGGARAN BIAYA BAHAN PEKERJAAN PERSIAPAN

NO URAIAN PEKERJAAN VOL SAT HARGA SATUAN

BAHAN

1 2 3 4 6

A. PEKERJAAN PERSIAPAN

A.1 1 m2 PEMBERSIHAN &PERATAAN TANAH 326 M2 Rp - A.2 1 M PAS. BOUWPLANK & PENGUKURAN 72.6 M' Rp 39,854.53 A.3 1 M' PAGAR SEMENTARA DARI SENG GELOMBANG, T = 2m 32.6 M' Rp 399,811.53 A.4 1 M2 PEMB. DIREKSI KEET DENGAN LANTAI PLESTER 16 M2 Rp 801,842.24 A.5 1 m2 PEMB.LOS KERJA 9 M2 Rp 375,382.62 A.6 1M2 PEMB. PAPAN NAMA PROYEK 1.5 M2 Rp 426,372.42

JUMLAH

Page 6: 1. Rev Pek Persiapan

TABEL 1

RENCANA ANGGARAN BIAYA UPAH PEKERJAAN PERSIAPAN

JUMLAH HARGA

BIAYA UPAGH BID PRICE BIAYA UPAH PELAKSANAAN

7 8

Rp 2,448,260.00 Rp 2,203,434.00 Rp 801,286.20 Rp 721,157.58 Rp 1,034,984.80 Rp 931,486.32 Rp 3,275,520.00 Rp 2,947,968.00 Rp 1,104,930.00 Rp 994,437.00 Rp 6,810.00 Rp 6,129.00 Rp 8,671,791.00 Rp 7,804,611.90

RENCANA ANGGARAN BIAYA BAHAN PEKERJAAN PERSIAPAN

JUMLAH HARGA

BIAYA UPAGH BID PRICE

7

Rp - Rp 2,893,438.88 Rp 13,033,855.88 Rp 12,829,475.84 Rp 3,378,443.58 Rp 639,558.63 Rp 32,774,772.81

Page 7: 1. Rev Pek Persiapan

TABEL 2PRODUKTIVITAS DAN DURASI PEKERJAAN PERSIAPAN

A PEKERJAAN PERSIAPAN

A.1 1 m2 PEMBERSIHAN &PERATAAN TANAH 326.00 M2

NO.URAIAN JENIS

KOEF SATUANJML TUKANG YG

HARGA SATUANPEKERJA DIBUTUHKAN

1 Pekerja 0.09 Oh 29.34 Rp 45,400.00 2 Mandor 0.045 Oh 14.67 Rp 59,400.00

JUMLAH

A.2 1 M PAS. BOUWPLANK & PENGUKURAN 72.6 M'

NO.URAIAN JENIS

KOEF SATUANJML TUKANG YG

HARGA SATUANPEKERJA DIBUTUHKAN

1 Pekerja 90 Oh 6534 Rp 45,400.00 2 Tukang Kayu 90 Oh 6534 Rp 55,900.00 3 Kepala Tukang Kayu 9 Oh 653.4 Rp 61,000.00 4 Mandor 4.5 Oh 326.7 Rp 59,400.00

JUMLAH

A.3 1 M' PAGAR SEMENTARA DARI SENG GELOMBANG, T = 2m 32.6 M'

NO.URAIAN JENIS

KOEF SATUANJML TUKANG YG

HARGA SATUANPEKERJA DIBUTUHKAN

1 Pekerja 0.36 Oh 11.736 Rp 45,400.00 2 Tukang Kayu 0.18 Oh 5.868 Rp 55,900.00 3 Kepala Tukang Kayu 0.018 Oh 0.5868 Rp 61,000.00 4 Mandor 0.018 Oh 0.5868 Rp 59,400.00

JUMLAH

A.4 1 M2 PEMB. DIREKSI KEET DENGAN LANTAI PLESTER 16 M2

NO.URAIAN JENIS

KOEF SATUANJML TUKANG YG

HARGA SATUANPEKERJA DIBUTUHKAN

1 Pekerja 0.9 Oh 14.4 Rp 45,400.00 2 Tukang Kayu 1.35 Oh 21.6 Rp 55,900.00 3 Tukang Batu 0.9 Oh 14.4 Rp 54,200.00 4 Kepala Tukang Kayu 270 Oh 4320 Rp 61,000.00 5 Mandor 45 Oh 720 Rp 59,400.00

JUMLAH

A.5 1 m2 PEMB.LOS KERJA 9 M2

NO.URAIAN JENIS

KOEF SATUANJML TUKANG YG

HARGA SATUANPEKERJA DIBUTUHKAN

1 Pekerja 0.9 Oh 8.1 Rp 45,400.00 2 Tukang Kayu 1.08 Oh 9.72 Rp 55,900.00 3 Kepala Tukang Kayu 0.108 Oh 0.972 Rp 61,000.00 4 Mandor 0.045 Oh 0.405 Rp 59,400.00

JUMLAH

A.6 1M2 PEMB. PAPAN NAMA PROYEK 1.5 M2

Page 8: 1. Rev Pek Persiapan

NO.URAIAN JENIS

KOEF SATUANJML TUKANG YG

HARGA SATUANPEKERJA DIBUTUHKAN

1 Pekerja 0.09 Oh 0.135 Rp 45,400.00 JUMLAH

Page 9: 1. Rev Pek Persiapan

TABEL 2PRODUKTIVITAS DAN DURASI PEKERJAAN PERSIAPAN

RAB / BIAYA UPAHDURASI JML TUKANG YANG PRODUKRIVITAS

KOEF AWAL(HARI) DIBUTUHKAN / HARI KEL.KERJA/HARI

Rp 1,332,036.00 5

5.86865.2 M2/Hari

0.1 Rp 871,398.00 2.934 0.05 Rp 2,203,434.00

RAB / BIAYA UPAHDURASI JML TUKANG YANG PRODUKRIVITAS

KOEF AWAL(HARI) DIBUTUHKAN / HARI KEL.KERJA/HARI

Rp296,643,600.00

1

6534

72.6 M'/Hari

0,100 Rp365,250,600.00 6534 0,100 Rp 39,857,400.00 653.4 0,010 Rp 19,405,980.00 326.7 0,005

###

RAB / BIAYA UPAHDURASI JML TUKANG YANG PRODUKRIVITAS

KOEF AWAL(HARI) DIBUTUHKAN / HARI KEL.KERJA/HARI

Rp 532,814.40

1

11.736

32.6 M'/Hari

0.4 Rp 328,021.20 5.868 0.2 Rp 35,794.80 0.5868 0.02 Rp 34,855.92 0.5868 0.02 Rp 931,486.32

RAB / BIAYA UPAHDURASI JML TUKANG YANG PRODUKRIVITAS

KOEF AWAL(HARI) DIBUTUHKAN / HARI KEL.KERJA/HARI

Rp 653,760.00

1

14.4

16 M2/Hari

1 Rp 1,207,440.00 21.6 2 Rp 780,480.00 14.4 1 Rp263,520,000.00 4320 0,300 Rp 42,768,000.00 720 0,050

###

RAB / BIAYA UPAHDURASI JML TUKANG YANG PRODUKRIVITAS

KOEF AWAL(HARI) DIBUTUHKAN / HARI KEL.KERJA/HARI

Rp 367,740.00

1

8.1

9 M2/Hari

1 Rp 543,348.00 9.72 1.2 Rp 59,292.00 0.972 0.12 Rp 24,057.00 0.405 0.05 Rp 994,437.00

Page 10: 1. Rev Pek Persiapan

RAB / BIAYA UPAHDURASI JML TUKANG YANG PRODUKRIVITAS

KOEF AWAL(HARI) DIBUTUHKAN / HARI KEL.KERJA/HARI

Rp 6,129.00 1 0.135 1.5 M2/Hari 0.1 Rp 6,129.00

Page 11: 1. Rev Pek Persiapan

REKAPITULASI BIAYA UPAH TENAGA KERJA PEKERJAAN PERSIAPAN

NO JENIS TUKANGJUMLAH

SATUAN HARGA UPAH JUMLAH UPAHTUKANG

1 Pekerja 6568.371 Oh Rp 45,400.00 Rp 298,204,043.40 2 Tukang Kayu 6571.188 Oh Rp 55,900.00 Rp 367,329,409.20 3 Kepala Tukang Kayu 4974.9588 Oh Rp 61,000.00 Rp 303,472,486.80 4 Tukang Batu 14.4 Oh Rp 54,200.00 Rp 780,480.00 5 Mandor 1047.6918 Oh Rp 59,400.00 Rp 62,232,892.92

jumlah 19176.6096 Rp 1,032,019,312.32

REKAPITULASI BIAYA BAHAN PEKERJAAN PERSIAPAN

NO JENIS BAHANJUMLAH

SATUAN HARGA BAHAN JML BIAYA BAHANBAHAN

1 Kayu Borneo 5/7 510.5472 M3 Rp 4,050,000.00 Rp 2,067,716,160.00 2 Paku Biasa 2" - 5" 15057.031 Kg Rp 17,210.00 Rp 259,131,503.51 3 Kayu Papan Albasia 3,389.55 M3 Rp 1,594,333.00 Rp 5,404,071,420.15 4 Dolken kayu dia 8 - 10/400 cm 71.55 Btg Rp 26,990.00 Rp 1,931,134.50 5 Semen Portland 641.5 Kg Rp 1,303.14 Rp 835,964.31 6 Seng Gelombang 48.12 Lbr Rp 48,625.00 Rp 2,339,835.00 7 Pasir Beton 1600.163 M3 Rp 193,000.00 Rp 308,831,459.00 8 Koral Beton 2400.2934 M3 Rp 195,120.00 Rp 468,345,248.21 9 Meni Besi 14.67 Kg Rp 20,250.00 Rp 297,067.50

10 Besi strip 17.6 Kg Rp 50,000.00 Rp 880,000.00 11 Pasir Pasang 2400 M3 Rp 119,167.00 Rp 286,000,800.00 12 Bata merah 480 Bh Rp 612.00 Rp 293,760.00 13 Seng Plat, BJLS 25 4000 Lbr Rp 48,625.00 Rp 194,500,000.00 14 Jendela nako 32 Bh Rp 123,750.00 Rp 3,960,000.00 15 Kasa polos 1280 M2 Rp 121,000.00 Rp 154,880,000.00 16 Kunci Tanam 2400 Bh Rp 55,000.00 Rp 132,000,000.00 17 Plywood 4mm 960 Lbr Rp 58,300.00 Rp 55,968,000.00 18 triplek 4mm 10.8 Lbr Rp 55,000.00 Rp 594,000.00 19 Cat kayu seiv 1.5 ltr Rp 39,430.00 Rp 59,145.00

jumlah 35315.3246 Rp 9,342,635,497.18

Page 12: 1. Rev Pek Persiapan

REKAPITULASI BIAYA UPAH TENAGA KERJA PEKERJAAN PERSIAPAN

DURASI JUMLAH TUKANG BIAYA UPAH

HARI PER HARI PER HARI

6

1094.7285 Rp49,700,673.90 1095.198 Rp61,221,568.20 829.1598 Rp50,578,747.80

2.4 Rp 130,080.00 174.6153 Rp10,372,148.82

3196.1016 ###

REKAPITULASI BIAYA BAHAN PEKERJAAN PERSIAPAN

DURASI JUMLAH BAHAN BIAYA BAHAN

(HARI) PER HARI PER HARI

6

85.0912 ###2509.5051666667 Rp43,188,583.92

564.925 ###11.925 Rp 321,855.75

106.91666666667 Rp 139,327.39 8.02 Rp 389,972.50

266.69383333333 Rp51,471,909.83 400.0489 Rp78,057,541.37

2.445 Rp 49,511.25 2.9333333333333 Rp 146,666.67

400 Rp47,666,800.00 80 Rp 48,960.00

666.66666666667 Rp32,416,666.67 5.3333333333333 Rp 660,000.00 213.33333333333 Rp25,813,333.33

400 Rp22,000,000.00 160 Rp 9,328,000.00 1.8 Rp 99,000.00

0.25 Rp 9,857.50 5885.8874333333 ###

Page 13: 1. Rev Pek Persiapan

TAEL 3PERHITUNGAN KEBUTUHAN BAHAN PEKERJAAN PERSIAPAN

A PEKERJAAN PERSIAPAN

A.2 1 M PAS. BOUWPLANK & PENGUKURAN 72.6

NO.URAIAN JENIS

KOEF SATUANJML BAHAN YG

HARGA SATUANBAHAN DIBUTUHKAN

1 Kayu Borneo 5/7 0,007 M3 508.2 Rp 4,050,000.00 2 Paku Biasa 2" - 5" 0,020 Kg 1452 Rp 17,210.00 3 Kayu Papan Albasia 0,007 M3 508.2 Rp 1,594,333.00

JUMLAH

A.3 1 M' PAGAR SEMENTARA DARI SENG GELOMBANG, T = 2m 32.6

NO.URAIAN JENIS

KOEF SATUANJML BAHAN YG

HARGA SATUANBAHAN DIBUTUHKAN

1 Dolken kayu dia 8 - 10/400 cm 1.25 Btg 40.75 26,990.00 2 Semen Portland 2.5 Kg 81.5 1,303.14 3 Seng Gelombang 1.2 Lbr 39.12 48,625.00 4 Pasir Beton 0.005 M3 0.163 193,000.00 5 Koral Beton 0.009 M3 0.2934 195,120.00 6 Kayu Borneo 5/7 0.072 M3 2.3472 4,050,000.00 7 Paku Biasa 2" - 5" 0.06 Kg 1.956 17,210.00 8 Meni Besi 0.45 Kg 14.67 20,250.00

JUMLAH

A.4 1 M2 PEMB. DIREKSI KEET DENGAN LANTAI PLESTER 16

NO.URAIAN JENIS

KOEF SATUANJML BAHAN YG

HARGA SATUANBAHAN DIBUTUHKAN

1 Kayu dolkenø 8 -10/400 cm 1.25 Btg 20 26,990.00 2 Kayu Papan Albasia 0,180 M3 2880 1,594,333.00 3 Paku Biasa 2" - 5" 0,850 Kg 13600 17,210.00 4 Besi strip 1.1 Kg 17.6 50,000.00 5 Semen Portland 35 Kg 560 1,303.14 6 Pasir Pasang 0,150 M3 2400 119,167.00 7 Pasir Beton 0,100 M3 1600 193,000.00 8 Koral beton 0,150 M3 2400 195,120.00 9 Bata merah 30 Bh 480 612.00

10 Seng Plat, BJLS 25 0,250 Lbr 4000 48,625.00 11 Jendela nako 2 Bh 32 123,750.00 12 Kasa polos 0,080 M2 1280 121,000.00 13 Kunci Tanam 0,150 Bh 2400 55,000.00 14 Plywood 4mm 0,060 Lbr 960 58,300.00

JUMLAH

A.5 1 m2 PEMB.LOS KERJA 9

NO.URAIAN JENIS

KOEF SATUANJML BAHAN YG

HARGA SATUANBAHAN DIBUTUHKAN

1 Kayu dolken dia 8 - 10/400 cm 1.2 Btg 10.8 26,990.00 2 Kayu Albasia 5/7 0.14 M3 1.26 1,594,333.00

Page 14: 1. Rev Pek Persiapan

3 Paku Biasa 2" - 5" 0.3 Kg 2.7 17,210.00 4 triplek 4mm 1.2 Lbr 10.8 55,000.00 5 Seng Gelombang, BJLS 25 1 Lbr 9 48,625.00

JUMLAH

A.6 1M2 PEMB. PAPAN NAMA PROYEK 1.5

NO.URAIAN JENIS

KOEF SATUANJML BAHAN YG

HARGA SATUANBAHAN DIBUTUHKAN

1 papan albasia 2/20 0.18 M3 0.27 1,594,333.00 2 kayu albasia 5/7 0.06 m3 0.09 1,594,333.00 3 Paku biasa 2", 5" 0.25 Kg 0.375 17,210.00 4 Cat kayu seiv 1 ltr 1.5 39,430.00

JUMLAH

Page 15: 1. Rev Pek Persiapan

TAEL 3PERHITUNGAN KEBUTUHAN BAHAN PEKERJAAN PERSIAPAN

M'

RAB / BIAYA BAHAN

### Rp 24,988,920.00 Rp810,240,030.60

###

M'

RAB / BIAYA BAHAN

1,099,842.50 106,205.91 1,902,210.00 31,459.00 57,248.21 9,506,160.00 33,662.76 297,067.50 13,033,855.88

M2

RAB / BIAYA BAHAN

539,800.00 4,591,679,040.00 234,056,000.00 880,000.00 729,758.40 286,000,800.00 308,800,000.00 468,288,000.00 293,760.00 194,500,000.00 3,960,000.00 154,880,000.00 132,000,000.00 55,968,000.00 6,432,575,158.40

M2

RAB / BIAYA BAHAN

291,492.00 2,008,859.58

Page 16: 1. Rev Pek Persiapan

46,467.00 594,000.00 437,625.00 3,378,443.58

M2

RAB / BIAYA BAHAN

430,469.91 143,489.97 6,453.75 59,145.00 639,558.63

Page 17: 1. Rev Pek Persiapan

NAMA KEGIATANDURASI

ES LS(Hari)

A.1 1 m2 PEMBERSIHAN &PERATAAN TANAH 5 0 0A.2 1 M PAS. BOUWPLANK & PENGUKURAN 1 5 5A.3 1 M' PAGAR SEMENTARA DARI SENG GELOMBANG, T = 2m 1 0 0A.4 1 M2 PEMB. DIREKSI KEET DENGAN LANTAI PLESTER 1 1 5A.5 1 m2 PEMB.LOS KERJA 1 1 5A.6 1M2 PEMB. PAPAN NAMA PROYEK 1 0 0

A.1 2 5 A.45 5 1

1 0 A.3 3 1 A.20 1 5 1

A.6 4 1 A.51 5 1

Deskripsi Kegiatan1 Pekerjaan Pembersihan dan Perataan tanah, Pekerjaan pagar sementara, pekerjaan papan nama proyek dilakukan bersamaan.2 Pekerjaan Pemasangan Bouwplank dilakukan setelah pekerjaan pembersihan dan perataan selesai3 Pekerjaan direksi keet dilakukan setelah pekerjaan pagar sementara proyek selesai4 Pekerjaan los kerja dilakukan setelah pekerjaan papan nama proyek selesai5 Jalur kritis terjadi pada pekerjaan pembersihan dan perataan tanah serta pekerjaan pemasangan bouwplank

Page 18: 1. Rev Pek Persiapan

EF LFKEGIATAN KEGIATAN

TF FF KETSEBELUM SESUDAH

5 5 - A.4 0 0 Kr6 6 A.1 - 0 01 5 - A.2 4 06 6 A.3 - 4 4 Kr6 6 A.6 - 4 41 5 A.5 4 0

5 66

Pekerjaan Pembersihan dan Perataan tanah, Pekerjaan pagar sementara, pekerjaan papan nama proyek dilakukan bersamaan.Pekerjaan Pemasangan Bouwplank dilakukan setelah pekerjaan pembersihan dan perataan selesai

Jalur kritis terjadi pada pekerjaan pembersihan dan perataan tanah serta pekerjaan pemasangan bouwplank