WBSETCL Corporate Plan 2020-21.pdf

20

Transcript of WBSETCL Corporate Plan 2020-21.pdf

WBSETCL has completed its glorious journey of thirteen long years as the sole Transmission Company of West Bengal which is devoted to provide uninterrupted, quality power to the people of Bengal and the nation. In the financial year 2019-20, total Transformer Capacity of WBSETCL is around 34223 MVA with Transmission Line length of around 14737 ckm spreading across the State covering farthest end of north to the remotest corner of south. Total 05 (five) new no. of sub-stations has been commissioned during the current financial year at different parts of Bengal to resolve low voltage issues thereby bringing the total count of sub-stations to 142 with the record Transmission Availability of 99.88%. The Company has made a turnover of Rs. 1399.66 crore which shows in increase of 3.44% in comparison with the previous year.

Despite the ongoing pandemic caused by COVID-19, the Company has proved its capability as the vigilant protector of the State Power System during the devastating Cyclone ‘Amphan’. Power was restored for most of the sub-stations located at the affected areas within a few hours and it is encouraging to note that the Company is able to stand up to the expectations of all the stakeholders. WBSETCL believes in not only “Transmitting Power” but also “Transmitting Happiness”.

From the Desk of The Managing Director

With best wishes,

(Santanu Basu)Managing Director

TRANSMISSION PROJECTSPROJECT EXECUTION (2019-20):Completed Projects :The projects completed during 2019-20 and made available to the transmission system of WBSETCL are furnished below:Sub-stations & Feeder Bays:Five (05) new sub-stations and different bays which were commissioned during 2019-20 and put into the system are as follows:

Thus total capacity addition in 2019-20 stands at 1230 MVA with total project cost is Rs. 246.71 crores.Transmission Lines:674.04 Circuit Kilometres (ckm) covering following 1 no. 400 KV line, 2 nos. 220 KV & 13 nos 132 KV transmission lines have been added to the system at an estimated cost of Rs. 338.97 crores.

Sl No. Name of the sub-station / bays Capacity addition (MVA)1 Rejinagar 220 KV AIS 4202 Gazole 220 KV GIS 4203 Dinhata 132/33 KV GIS sub-station 1004 Salt Lake Stadium 132 KV GIS 1905 Jhalda 132/33 KV GIS sub-station 1006 1 no. 132 KV Feeder Bay at Rangapani TSS7 2 nos. 132 KV Line Bays (AIS) at Durgapur

220 KV Sub-station

8 1 no. 132 KV AIS feeder bays at Balurghat 132/33 KV sub-station 9 2 nos. 132 KV AIS feeder bays at Serakol sub-station

Sl No. Name of the transmission line CKM addition1 400 KV D/C Transmission line for LILO of Arambag – Durgapur 400 KV S/C line at New Chanditala

Sub-station.96.8

2 220 KV D/C LILO of 220 KV D/C Gokarna- Krishnanagar line at Rejinagar 93 220 KV D/C LILO of 220 KV D/C Malda-Dalkhola line (PGCIL) at Gazole 220 KV SS. 6.064 132 KV S/C line on D/C tower from TCF PS-I 132 KV S/Stn to proposed Rangapani Traction S/Stn. 7.5175 132 KV D/C Line for LILO of one circuit of Coochbehar – Mathabhanga 132 KV D/C Line at Dinhata 92.0146 132 KV D/C Line from Bashirhat 132 KV sub-station to nearest point of existing Barasat - New Town AA-III

132 KV line 70.76

7 132 KV D/C line from Bagmundi 132/33 KV sub-station to proposed Jhalda 132 KV GIS. 101.128 132 KV S/C line on D/C tower from Serakol - Hotor TSS. 13.4879 D/C LILO of Amtola- Debogram 132 KV D/C line at Rejinagar 220 KV SS. 16.4

10 132 KV D/C line connectivity between Gazole 220 KV SS and Malda 132 KV SS. 1.2211 132 KV D/C line connectivity between Gazole 220 KV SS and Raiganj 132 KV SS. 1.2212 132 KV D/C line from Gazole 220 KV SS to Samsi 132 KV SS. 1913 132 KV D/C line for connectivity between Gazole 220 KV SS and Balurghat 132 KV SS (RL=2 KM) and

conversion of S/C line on D/C tower (about 100 KM) to D/C lineto establish Gazole - Balurghat 132 KV D/C line.

91.976

14 132 KV D/C line from Keshiary 132 KV SS to Pingla 132 KV SS. 80.615 132 KV S/C UG Cable Line from Salt Lake 132 KV AIS S/S to Salt Lake Stadium 132 KV GIS 4.716 132 KV D/C line from Indus 132 KV SS to Raina 132 KV SS. 62.2

ONGOING PROJECTSSub-stations:Work of following 21 nos. new sub-stations (5 nos. 220 KV & 16 nos. 132 KV sub-station), various bays at existing sub-stations are under execution. The completion of above mentioned work will result in addition of a further 3476 MVA to the system.

Sl No. Name of the sub-station / bays Installed Capacity (MVA)1 New Town IIC 220 KV GIS 5202 Baruipur 220/132 KV GIS 4203 Mangalpur 220/132 KV GIS sub-station 200

Sl No. Name of the sub-station / bays Installed Capacity (MVA)4 Jangalpur 220 KV GIS 4205 Belmuri 220 KV GIS Sub-station 3206 Panagarh 132/33 KV GIS 507 Burdwan 132 KV GIS 1508 Debra 132/33 KV GIS 1009 Salar 132/33 KV GIS 100

10 Minakhan 132/33 KV GIS 10011 Harischandrapur 132/33 KV GIS 10012 Renia 132/33 KV GIS 10013 Kona 132/33 KV GIS 15014 Labhpur 132 KV GIS 10015 Panchami 132/33 KV GIS 10016 Bagula 132/33 KV GIS 12017 Kushmundi 132/33 KV GIS 10018 Construction of Ramnagar 132/33 KV sub-station Dist Purba Medinipur 10019 Construction of Manbazar 132/33 KV sub-station Dist Purulia 6320 Construction of Birlapur 132/33 KV sub-station Dist 24 Parganas South 10021 Ramganga 132/33 KV GIS sub-station Dist. 24 Parganas (South) 6322 One no 132 KV Feeder Bay at Pundibari TSS. 23 2 nos. 132 KV feeder bays each at Moinaguri 132/33 KV sub-station 024 2 nos. 132 KV GIS Bay at Bagnan 132 KV GIS 25 1 no. 132 KV GIS bays at Salt Lake 132/33 KV GIS sub-station 26 2 nos. 132 KV feeder bays at Bolpur 132/33 KV sub-station 27 2 nos. 132 KV feeder bays at Sadaipur 220/132/33 KV sub-station 28 (i) 2 nos 400 KV GIS line bays for termination of Jeerat (New) - Jeerat (WBSETCL) 400 KV

D/C line (ERSS XVIII) and its associated works.(ii) Construction of 2 nos 400 KV GIS line bays for tremination of Sagardighi TPS -

Subhasgram PGCIL 400 KV S/C line (ERSS XVA) and its associated works.(iii) Modification of termination arrangement of 4 nos. 400 KV existing feeders at Jeerat

400 KV sub-station (ERSS XV B) and its associated works.29 2 nos. 132 KV AIS feeder bays at Keshiary 132/33 KV sub-station 30 2 nos. 132 KV AIS feeder bays at Pingla 132/33 KV sub-station 31 2 nos. 132 KV AIS feeder bays at Raina 132/33 KV sub-station 32 2 nos. 132 KV GIS bays at Kuli 132/33 KV sub-station 33 2 nos. 132 KV AIS feeder bays at Tarakeshwar 132/33 KV sub-station 34 2 nos. 132 KV AIS feeder bays at Jangipara 132/33 KV sub-station 35 2 nos. 132 KV GIS bays at Indus 132/33 KV GIS sub-station Dist. Bankura 36 2 nos. 132 KV AIS bays at Hura 220/132 KV GIS sub-station Dist. Purulia 37 2 nos. 132 KV AIS bays at Serakol 132/33 KV GIS sub-station Dist. 24 Parganas South 38 2 nos. 132 KV GIS bays at Kakdwip 132/33 KV sub-station Dist. 24 Parganas South 39 2 nos. 132 KV GIS bays at Laxmikantapur 220/132 KV sub-station Dist. 24 Parganas South 40 1 no. 132 KV GIS bays at Mohitnagar 132 KV GIS sub-station Dist. Jalpaiguri 41 2 nos. 220 KV GIS bays at Barasat 220 KV GIS sub-station Dist. 24 Parganas North

Total estimated project cost of the above sub-stations and bays is Rs. 822.95 crores.

Transmission Lines: A total 40 nos. transmission lines (2 nos. 400 KV, 6 nos. 220 KV & 32 nos. 132 KV lines) are under execution whose completion will result in addition of a further 1752.67 ckm to the system. Details of the lines are furnished below:

Sl No. Name of the transmission line CKM

1 400 KV twin moose transmission line from Gokarna to Sagardighi TPS 82

2 400 KV D/C & M/C Transmission line with Twin Moose ACSR conductor from New Chanditala 400 KV Sub-station to Gokarna 400 KV Sub-station. 360

3 220 KV D/C Line from Rajarhat 400 KV Sub-station (PGCIL) to composite tower near Rajarhat PGCIL 400 KV sub-station end. 7.332

4 S/C LILO of Arambagh – Rishra 220 KV S/C Line at New Chanditala 400 KV Sub-station 33

5 220 KV D/C Line from Subhashgram (PGCIL) Sub-station to Baruipur 220 KV Sub-station (58 ckm). 58

6 D/C LILO of Howrah – KTPP 220 KV D/C line at Jangalpur 220 KV GIS ( RL=0.45 KM) 0.9

7 S/C LILO of 220 KV D/C Durgapur – Asansole Tr. Line at proposed Mongalpur 220 KV GIS (RL=2.17 KM) 4.34

8 220 KV S/C LILO of Arambagh – New Chanditala S/C line at Belmuri 220/132 KV sub-station. 33.7

9 132 KV D/C transmission line from Food Park sub-station to Ambuja Cement Factory 6.078

10 132 KV S/C line on D/C tower from Coochbehar 132 KV S/Stn to proposed Pundibari traction S/Stn. 10

11 132 KV D/C Line from Moinaguri Sub-station. to Mathabhanga Sub-station. 15.95

12Construction of 132 KV D/C Transmission line from composite tower near Durgapur Sub-station to proposed Panagarh 132 KV Sub-station along with its associated works and Laying of 132 KV UGXLPE cable in between composite tower and gantry tower at Durgapur Sub-station

61.3

13 132 KV D/C & M/C Transmission line on D/C & M/C tower from Kharagpur 400 KV Sub-station to Jhargram 132 KV Sub-station and laying of 132 KV UG Cable within Kharagpur 400 KV Sub-station. (93.2 ckm). 93.2

14 LILO of Domjur – Uluberia 132 KV D/C Transmission Line at Foundry Park 220 KV Sub-station. 7.32

15 132 KV D/C line from TL no. 21 of Midnapur- Kharagpur WBIDC 132 KV D/C line to proposed Debra 132 KV GIS. 52

16 D/C LILO of Amtola – Berhampore 132 KV D/C line at Rejinagar 220 KV SS. 44.6

17 D/C LILO of Gokarna – Katwa 132 KV D/C line at Salar 132 KV SS. 4.2

18 132 KV D/C line from Baruipur 220/132 KV SS to Serakol 132 KV SS using HTLS conductor. 32

19 D/C LILO of 132 KV Satgachia – Mahachanda transmission line at Burdwan 132 KV GIS using UG cable. 1

20 132 KV D/C UG Cable Line from Kasba 220 KV S/S to Salt Lake Stadium 132 KV GIS 12

21 132 KV S/C UG Cable Line from Salt Lake 132 KV GIS S/S to Salt Lake Stadium 132 KV GIS 4

22 D/C LILO of Bajkul – Contai 132 KV D/C Tr. Line at Proposed Ramnagar 132 KV on M/C tower (RL = 1 KM D/C + 30 KM M/C) 122

23 D/C LILO of existing 132 KV Kasba – Sonarpur-Behala Tr. Line at proposed Renia 132 KV GIS (RL=0.3 KM OH+ 1 KM UG cable) 5.2

24 132 KV D/C line from Subhasgram 220 KV S/S to proposed Minakhan 132 KV S/S (RL= 34 KM OH and 0.65 KM UG cable) 69.3

25 132 KV D/C line from Tarakeswar 132 KV S/S to Jangipara 132 KV S/S (RL=20 KM) 40

26 132 KV D/C line from Bolepur 132 KV S/S to Lubhpur 132 KV GIS (RL=20 KM) 40

Sl No. Name of the transmission line CKM

27 132 KV S/C UG cable (single core Aluminium) line from Panagarh 132 KV GIS (WIP) to M/s. ECL (RL=1.51 KM) 1.51

28 D/C LILO of Krishnanagar – Bangaon 132 KV D/C Tr. Line at proposed Bagula 132 KV GIS (RL=21.4 KM D/C & 0.4 KM M/C) 44.4

29 132 KV 2- Phase S/C line from Malda 132 KV sub-station to proposed Khaltipur TSS (RL=23 KM) 23

30 132 KV D/C line from Sadaipur 220 KV SS to proposed Pachami 132 KV GIS (RL= 38.5 KM) 77

31 132 KV D/C line (RL=25 KM) from LILO point of Sainthia – Rampurhat – Kuli line towards Rampurhat to proposed Pachami 132 KV GIS to establish Kuli- Pachami 132 KV D/C line. 50

32 LILO of Raiganj – Gangarampur-132 KV S/C line at Kushmundi 132 KV GIS (RL=0.7 KM) 1.4

33 D/C LILO of Malda – Samsi – Raiganj 132 KV D/C Tr. Line at proposed Harischandrapur 132 KV GIS. (RL=71 KM) 142

34 LILO of Gokarna – Rampurhat 132 KV S/C Tr line at Kuli 132 KV GIS (RL=4 KM D/C ) 8

35 132 KV D/C line from Moinaguri 132 KV SS to LILO point of NJP- Moinaguri 132 KV Tr line towards Chalsa to establish Moinaguri - Chalsa 132 KV D/C and Moinaguri _ NJP 132 KV D/C connectivity (RL=3.9 KM) 7.8

36 132 KV 2 Phase S/C transmission line from Gokarna 400 KV sub-station to proposed Khagraghat TSS (RL=15.5 KM) 15.500

37 132 KV D/C line from Hura 220/132 KV SS to Manbazar 132/33 KV GIS SS 76.00

38 132 KV D/C line from Baruipur 220/132 KV SS to Birlapur 132/33 KV GIS SS (OH) & UG cable line 72.2

39 132 KV S/C LILO of Joka-Falta D/C line at Serakol 132/33 KV SS 32.0

40 132 KV S/C line from Mohitnagar to M/s. Star Cement Premises. 2.44

Some of the future Projects are also furnished hereunder : l Gaighata 132/33 KV GIS & associated line.l Nilganj 132/33 KV GIS and associated line.l Panpur 132/33 KV GIS and associated linel Mondarmoni 132/33 KV GIS & associated line.l 2 nos. 50 MVA transformer bay at Sagardighi 220/132 KV GIS sub-station.l 2 nos. 220 KV AIS bays at Krishnanagar 220/132 KV sub-station.l 1 no. reactor bay at PPSP 400 KV GIS sub-station.l Establishment of 220 KV D/C connectivity between Rajarhat 400 KV GIS sub-station of PGCIL & Barasat 220 KV GIS sub-station.l Extension of Jeerat – Satgachia 220 KV defunct line from Chakdah point to Krishnanagar 220 KV sub-station to establish Jeerat

– Krishnanagar 220 KV D/C connectivity.l 220 KV D/C line to tie-up Jeerat – Satgachia D/C line and Rishra - Dharampur 220 KV D/C line to establish Satgachia – Rishra

220 KV D/C connectivity.l 220 KV D/C line by LILO of existing STPS - J.K.Nagar 220 KV S/C line at Asansol 220 KV sub-station.

Incomplete / Stalled Project :

Progress of quite a few transmission lines are getting affected for problems associated with local problems / right of way issues/ court cases. Rigorous interactions with the administration and statutory bodies are on to complete those projects. Details of such projects are given below:l Work of 132 KV D/C transmission line from Food Park to Ambuja Cement Factory could not be completed due to acute right of

problem in spite of constant persuasion with local and district administration.l Execution of LILO of Domjur – Uluberia 132 KV D/C Transmission Line at Foundry Park 220 KV Sub-station is held up due to

severe ROW problems in spite of repeated persuasion with local and district administration.l 0.676 KM stringing work of Moinaguri – Mathabhanga 132 KV D/C line is held up due to acute ROW problems/court case.l 1.215 KM stringing work is held up in 132 KV S/C line on D/C tower from Coochbehar 132 KV S/Stn to proposed Pundibari traction

S/Stn. due to acute ROW problems, persuasions are on with district administration to sort out the issue.

Total estimated project cost of the above 40 nos. lines is Rs. 1463.11 crores.

Augmentation of Transformation capacity at different sub-stations to meet (N-1) criterion for all sub-stations under Tr (O&M) (In accordance of transmission planning guideline issued by CEA) to cater to load demand during system disturbance & exigencies.

1. Capacity Addition for Financial Year 2019-20 & 2020-21

Brief description of work

Financial year Voltage class( in KV)

MVA Added

Sub-station

2019-20

220/132 KV 160 a. 160 MVA with Bay.- Haldia 220 KV (1)

132/33 KV 433.5

a. 50 MVA in place of 31.5 MVA- Barjora(2), Bongaon(1), Jangipara(2), Khanyan(2), Sonarpur (1),

Mohispota (2), Subhasgram(2),Ujanu(2), C-zone(2). Total: 296 MVAb. 50 MVA in place of 20 MVA

- Birpara(2). Total: 60 MVAc. 31.5 MVA with Bay

- Balurghat(1). Total: 31.5 MVAd. 31.5 MVA in place of 20 MVA

- Chalsa(2), Gangarampur(1), A-zone(1). Total: 46 MVA

33/11 KV 72.4

a. 10MVA in place of 6.3 MVA- Behala(1), Kalyani(2), Sainthia(1), Subhasgram(2), Rampurhat(1),

Chanditala(2), Total: 33.3 MVAb. 10 MVA with Bay

- Raiganj(1). Total: 10 MVAc. 6.3MVA with Bay

- Amtala(1),Barasat (1),Subhasgram(2). Total: 25.2 MVAd. 6.3 MVA in place of 5 MVA.

- Maynaguri(2), Adisaptagram(1). Total: 3.9 MVA

2020-21

132/33 KV 510.5

a. 50 MVA in place of 31.5 MVA- Subhasgram(1), Raiganj(1), Bongaon(1). Total: 55.5

b. 50 MVA in place of 30 MVA- Maynaguri(1). Total: 20 MVA

c. 50 MVA with Bay- NewTown AA-I (1), Azone(1). Total: 100 MVA

d. 31.5 MVA with Bay- Mohispota(1), Kakdwip(1), Krishnanagar(1), Dhulian(1), Belmuri(1),

Kamakhyaguri(2), Serakol(1), Bighati(1), Foundary park(1). Total: 315 MVAe. 20 MVA with Bay

- Lalgola(1). Total: 20 MVA

33/11 KV 143.7

a. 10MVA in place of 6.3 MVA- Kalyani(1), Uluberia(2), Amtala(1), Barasat(1), Basirhat(2), Debogram(2),

Tarakeswar(2), NBU(2). Total:48.10 MVAb. 10MVA in place of 5 MVA

- Ranaghat(3). Total: 15 MVAc. 10 MVA with Bay

- Hizli(1), Samsi(1). Total: 20 MVAd. 6.3MVA with Bay

- Basirhat(1), Belmuri(1), Bongaon(1),Chalsa(1), Mahachanda(1), Mankar(1), New bishnupur(1), NJP(1), Raina(1). Total: 56.7 MVA

e. 6.3 MVA in place of 5 MVA.- Bishnupur(2), Debogram(1). Total: 3.9 MVA

66/33 KV 7 10 MVA in place of 8/5 MVA - Hasimara (2)

66/33 KV 5 10 MVA in place of 7.5 MVA - Odlabari (2)

132/25 KV 27.74 02 nos. 30.24 MVA Tr in place of existing capacity in Liluah & Haldia

TRANSMISSION O&M

2. Power Sector Development Fund (PSDF)

Financial Year Brief description of work

2019-20 &

2020-21

Renovation & modernization of transmission system for relieving congestion in intra state transmission system (Replacement of existing conductor by HTLS & AI59).

(a) New Haldia - Haldia - Haldia NIZ 132 KV D/C.(b) Gokarna - kuli 132 KV D/C.(c) KTPS Tamluk 132 KV D/C.(d) Kasba - KLC - Salt lake 132 KV D/C.(e) Kasba - Sonarpur 132 KV D/C.(f) New town 220 KV - Saltlake GIS.(g) New Chanditala - Rishra 220 KV S/C.

Installation of switchable reactor & Shunt Capacitor (a) 125 MVAR, 400 KV Bus reactor at Arambag 400 KV Sub-station (Commissioned).(b) 590 MVAR, 33 KV Shunt capacitor at 36 nos different sub-station (WIP). [Commissioned - 60 MVAR: Jhargram(10), Birsingha(20), Midnapore(10), CK Road (10) & Kharagpur (10)](c) 20 MVAR, 33 KV Shunt capacitor, at Samsi under (O&M) scheme (WIP).(d) 125 MVAR, 400 KV Bus Reactor at Gokarna, Kharagpur, Durgapur & New Chanditala.

3. Re-conductoring & Insulator replacement

2019-20 &

2020-21

To regain rated ampacity & improve system stability, reconductoring of the following lines is under progress & expected to be completed during FY-2019-20.

(i) 220 KV KTPP - Howrah D/C line (R.L: 7.0 KM ,by ACSR Zebra).(ii) 220 KV STPS - Durgapur, STPS-Asansol & Asansol-Durgapur line excepting LILO portion (R.L: 102 KM by ACSR

Zebra).(iii) 132 KV Sainthia - Sadaipur D/C Line: R.L: 14 KM by ACSR panther.(iv) 220 KV STPS - New Bishnupur D/C line: R.L: 110 KM by ACSR Zebra. (Completed except Railway Crossings)(v) 220 KV BKTPP - Satgachia D/C line: R.L: 92 KM by ACSR Zebra.(vi) 220 KV BKTPP - Sadaipur D/C line: R.L: 4.7 KM by HTLS (Completed).(vii) 220 KV Howrah - New Chanditala D/C Line by HTLS..(viii) 220 KV Rajarhat (WBSETCL) - Rajarhat(PG) by HTLS.(ix) 66 KV Alipurduar - Hamiltonganj, 66 KV Birpara - Banarhat & 66 KV Chalsa - Nagrakata by new ACSR DOG.

2020-21To reduce unscheduled outage & improve system availability, replacement of existing conventional age-old insulators by polymer insulators is under process & expected to be completed: (i) 220 KV KTPP- Howrah D/C Line

4. Bulk Power supply to different TSS /Transmission line diversion for RVNL / NHAI / Railways / WBHDCL etc

2019-20 &

2020-21

Following bulk power supply & major diversion works i.r.o Transmission lines are under execution & expected to be completed:(i) Bulk power supply to TSS: Talpur, Bishnupur, Hotor, Dalkhola ( Completed), New Moynaguri (Completed),

Jangipur.(ii) NHAI/Asian Highway/WBHDCL/PWD:

(a) NH-34: Raiganj-Dalkhola 132 KV D/C (Karandighi by-pass), 132 KV Gokarna-Berhampur D/C, 132 KV Dhulian-Khejuria D/C line, 132 KV Raghunathganj-Khejuria D/C Line.

(b) NH-31: 132 KV Dalkhola-TCF-III ( Islampur By-pass) D/C Line, Chalsa-Odlabari 66 KV S/C.(c) NH-31D: 132 KV D/C TCF-I-II & TCF I-III S/C (Ghoshpukur- Salsabari Section)

132 KV Birpara-Coochbehar S/C 132 KV Alipurduar – Coochbehar S/C 132 KV Alipurduar – Birpara S/C 66 KV Alipurduar – Coochbehar S/C 66 KV Alipurduar – Kamakhyaguri S/C

(d) Asian Highway-48: Birpara – Hasimara 66 KV S/C (Completed)(e) PWD: 220 KV TLPDP IV – Kalijhora D/C (Completed).(f) WBHDCL: 220 KV Jeerat – Dharampur D/C (Mogra-Barajaguli Section)

132 KV Bandel -Dharampur D/C 132 KV Dharampur -Titagarh D/C 132 KV Jeerat-Dharampur D/C 220 KV Jeerat- Satgachia D/C 132 KV Adisaptagram- Belmuri D/C (Completed) (Mogra-Iswar Gupta Setu Section) 132 KV BTPS- Bighati D/C 132 KV BTPS- Adisaptagram D/C (completed) 132 KV BTPS- Dharampur D/C

(iii) Eastern Railway - Balgona- Katwa Section: Katwa-Gokarna 132 KV D/C (Completed).

Financial Year Brief description of work

2019-20 &

2020-21

(iv) RVNL: a. New Garia-Biman Bandar Metro Section. (i) Kasba – Saltlake 132 KV D/C. (ii) NTAA I – Saltlake AIS/GIS 132 KV D/C. b. Joka-BBD Bag Metro section, Behala(JOKA)- Garden reach 132 KV D/C.(v) Other Diversions: - Diversion of 220 KV D/C Jeerat-Satgachia Tr Line for proposed MAKAUT at Haringhata. - Diversion of Rishra-Chanditala 132 KV D/C Transmission line at the premises of M/S Rawalwasia Logistics LLP. - Damodar valley corporation (DVC): 220 KV STPS- Durgapur-Asansol (Completed). - Medical college at Abdulghata (Site-2), Raiganj-Gangarampur (Completed). - West Bengal livestock development corporation limited: establishment of commercial chicken layer farm at Kalyani: 132 KV D/C Bandel-Dharampur (completed). - Upwan project site under uttarayan complex, Siliguri: 132 KV Ujanu-NBU S/C. (Completed).(vi) Double circuit LILO for greater flexibility

a. KTPP-Uluberia 132 KV D/C LILO at Bagnan (Completed). b. BTPS-Satgachia 132 KV D/C LILO at Khanyan (Completed). c. Bajkul - Egra 132 KV D/C LILO at Contai .

5. Construction of 33 KV Bays under IPDS under IPDS/DDUGJY/O & M Scheme

2019-20 Under IPDS/DDUGJY/O & M scheme of WBSEDCL, around 61 nos out of 100 nos, 33 KV feeder bays have been completed and remaining work is under process.

2020-21 Under IPDS/DDUGJY/O & M scheme of WBSEDCL, Additional 40 nos of 33 KV Bays work is under process.

6. System Improvement

2019-20

1. Replacement of old Aged 12 KV Switchgear panel by new 12 KV Switchgear panel. - Krishnanagar, Bongaon, Basirhat, Lakshmikantapur, Adisaptagram, Rampurhat, Birsingha, Tarakeswar, Ranaghat,

Hamiltonganj,Uluberia.2. Installation of 2nd Set of 132 KV & 33 KV Potential Transformer. 132 KV PT: - Bolpur, Rampurhat, 33 KV PT: - Birsingha, Both132 KV & 33 KV PT: - Tarakeswar (33 KV PT), Jhargram, Barasat, Samsi.3. Battery & Battery charger: - Installation of 2nd Set of Battery & Battery charger’s were being considered & placed for all sub-stations where

single DC source exists. (i) 30V,125AH VRLA BATTERY BANK- HALDIA 132, TAMLUK, EGRA, KALIMPONG. (ii) 48V,300AH VRLA BATTERY BANK- KALYANI. (iii) 48V,150AH VRLA BATTERY BANK- TAMLUK, SALTLAKE 132. (iv) 220V,400AH VRLA BATTERY BANK- MAHACHANDA. (v) 220V,300AH VRLA BATTERY BANK- HALDIA 132, BONGAON,RANAGHAT, BOLPUR, NBU, KATWA. (vi) 220V,200AH VRLA BATTERY BANK- MALDA.4. Replacement of old aged installed equipment by new Circuit Breaker/Current Transformer/Isolators at different

sub-stations.

2019-20

1. Replacement of old Aged 12 KV Switchgear panel by new 12 KV Switchgear panel. -Jangipara, Hasimara, Nagrakata, Raiganj, Malda, Birpara, KLC, Alipurduar, Banarhat & Debogram.2. Installation of 2nd Set of 132 KV & 33 KV Potential Transformer. 132 KV PT: - KLC Bantala, Subhasgram, Contai, Domjur, Basirhat, Mohispota, Raina, Katwa, Berhampore , Hura, Uluberia. 33 KV PT: - Arambag, Tarakeswar, Kalna, Kharagpur WBIIDC,Pingla,Tamluk. Both 132 KV & 33 KV PT: - Ashokenagar, Khanyan, New town 132, Belmuri, Bighati, Mankar, Titagarh, Bongaon, Tarakeswar (132 KV PT),

Mahachanda. Replacement of OLD 132 KV PT: A_zone(3) & B_Zone (3)3. Battery & Battery charger: - Installation of 2nd Set of Battery & Battery charger is being considered & placed for all sub-stations where single

DC source exists. (i) 110 V, 200 AH VRLA BATTERY BANK- KALIMPONG, CHALSA. (ii) 220 V, 200 AH VRLA BATTERY BANK- KHEJURIA, BIRSINGHA, RAIGANJ.

Financial Year Brief description of work

2019-20

(iii) 220 V, 300 AH VRLA BATTERY BANK- RAGHUNATHGUNJ, HIZLI, PINGLA, KGP, VIDYASAGAR PARK, SAMSI, SERAKOL, SONAKHALI, PURULIA, UKHRA, DURGAPUR, HURA, NEWTOWN 132, RAGHUNATHPUR, SALTLAKE GIS, TITAGARH, SALTLAKE, KOLAGHAT, TAMLUK, BEHALA, FALTA, KHANYAN, SONARPUR, FOUNDRY PARK,BAGNAN , FOOD PARK, LILUAH, ULUBERIA, MOHISPOTA, ADISAPTAGRAM, BELMURI, BIGHATI, CHANDITALA, CK ROAD, RAMPURHAT, BASIRHAT, KALYANI, DEBOGRAM, NAZIRPUR, SAINTHIA, TARAKESWAR, BANKURA, BARJORA, BISHNUPUR, CONTAI, DOMJUR, RAINA, JHARGRAM, BONGAON.

(iv) 220 V, 400 AH VRLA BATTERY BANK- ARAMBAG(v) 30 V, 125 AH VRLA BATTERY BANK- SAMSI, NJP, CONTAI.(vi) 48 V, 200 AH VRLA BATTERY BANK - PURULIA(vii) 48 V, 300 AH VRLA BATTERY BANK- EGRA, MIDNAPUR

4. Replacement of old aged installed equipment by new Circuit Breaker/Current Transformer/Isolators at different sub-stations

7. Diagnostic Equipment

2019-20 &

2020-21

Procurement of following Diagnostic equipment’s (in Nos): 1. Circuit Breaker Time Interval Meter: 35 Sets. 2. D.C Earth Fault Locater: 08 Sets. 3. 3rd Harmonic measuring device: 08 Sets ( Already Purchased). 4. Partial discharge measuring KIT (for Switchyard): 23 Sets. 5. Partial discharge measuring KIT (for Indoor Switchgear): 22 Sets. 6. GPS coordinate Locator: 08 Sets. 7. Thermo vision Camera: 25 Sets. 8. Tan Delta & Capacitance Measuring Kit: 06 Sets.

8. Civil System Improvement

2019-20 &

2020-21

The following works are under execution & expected to be completed: 1. Building: a. Construction of “GREEN”, B+G+7 Corporate office building of WBSETCL at Plot no: AH/3 within Action Area-I,

New Town, Kolkata. b. Construction of 5 nos, Administrative building at Midnapore , Berhampur, Siliguri, Howrah & Purulia. (All Completed) c. Construction of 4 storied WBSETCL Knowledge Centre at New Town. d. B & C Type Quarter/Inspection Bungalow: Domjur (Completed), Kasba, Balurghat, Coochbehar, Hasimara. 2. Earth mat: Raiganj, Balurghat and Birpara. 3. Crushed stone/gravel stone spreading: Hamiltonganj, Jangipara (Completed), Subhasgram, Raghunathpur,

Alipurduar, Sonarpur (Completed), Kasba, Debogram (Completed), Gokarna (Completed), Egra, Newtown, Mohispota, Amtala, Krishnanagar, Khanyan (Completed).

4. Boundary Wall: Banarhat, Tamluk.

STATE LOAD DESPATCH CENTREAs per provision 32 under Part V of the Electricity Act 2003, the West Bengal State Load Despatch centre (WBSLDC) is the apex body to ensure integrated operation of the power system in the state of West Bengal. SLDC acts in co-ordination with the transmission utilities, generation agencies, distribution licensees, ERLDC and ERPC. SLDC plays an important role in maintaining different system parameters (e.g: frequency, voltage, line/transformer loading etc.) of the State Grid as an integral part of the National Grid as per prevailing regulatory guideline through round-the-clock system monitoring. SLDC also carries out intra-state Energy Accounting in the state of West Bengal.Activities of SLDC :A. Technical functions :-

1. Round-the-clock monitoring of the state EHT network maintaininga) Securityb) Reliabilityc) And to achieve optimum economy.

2. Balancing Load-Generation through proper scheduling of state as per different requirements of each constituent in each 15 minutes time block throughout the day (i.e 96 blocks) within regulatory framework.

3. Granting proposal for shutdown of network elements as and when required by different licensees to carry out maintenance and augmentation work after detailed network study considering Grid security.

4. Load-flow study and analysis and declaration of Total Transfer Capability (TTC) & Available Transfer Capability (ATC) of West Bengal State Transmission Network considering forecasted load/generation data of all the state entities.

5. WBSLDC co-ordinates with other statutory bodies like ERLDC, ERPC to ensure healthy operation of the WEST BENGAL system as an integral part of National Grid.

B. Commercial functions :-1. State level Energy Accounting

a) Preparation of FINAL schedules.b) Processing ABT compliant meter data for each day.c) Preparation of Deviation Settlement bills.d) Preparation of monthly Capacity charge statements and certification of the same.e) Preparation of variable energy statements and certification.f) Preparation of Intra-state Reactive Energy Charge bill.

2. Granting permission for open access power trading, both bilateral and trading through exchanges, keeping ATC/TTC limits in view.

3. Maintaining/Operating the UI pool fund.4. Computation and collection of Transmission charges, SLDC charges, Meter charges etc. as Nodal agency for Intra-State

STOA.C. Statistical functions :-

1. Providing daily statistical report to CEA, ERPC, ERLDC and other State authorities.2. Different record keeping for daily, monthly and yearly power system report i.r.o :-

i) Unit-wise and total power generated by generating agenciesii) Total energy demand met, load-shedding and demand potential of distribution licensees and the state as a wholeiii) Maximum demand met and maximum demand potential of distribution licensees and the state as a wholeiv) States share in Central generating stationsv) Tie-line exchangesvi) Details of power tradingvii) Any other relevant power system reports

3. Generating reports as per Regulatory directives.4. Providing statistical data for future system planning.

D. Other functions :-1. Coordinating and organizing different meetings with state entities as well as with ERLDC and ERPC for properly

addressing different techno-commercial issues within the state. 2. Implementing different directives for statutory bodies like CERC, WBERC, CEA for secured Grid operation and

commercial settlement.3. Acting as a State Agency within the State of West Bengal for giving accreditation certificate to Renewable Energy

Generator to participate in REC mechanism.Progress & Achievements of SLDC during the year 2019-20 : Achievement:

a) Successful Mock Black start operation of TLDP-IV – November-2019.b) SLDC’s action regarding VAR management & continuous persuasion & monitoring of intra-state generators to absorb VAR

during winter lean hours has helped in controlling over voltage & thereby reduction of high VAR bill of the state. c) WBSLDC handled the State network efficiently to transmit the power to meet the demand. During the period 2019-20, State

total system (54738 MU) [ WBSEDCL + CESC + IPCL ] has increased by 2.66% and peak system (9077 MW) increased by 3.02% w.r.t 2018-19.

Progress:a) WBSLDC has taken a project for a comprehensive IT solution along with commensurate hardware installation at SLDC for

intra-state energy accounting as well as for West Bengal power system data management based on 100% metering and web-based scheduling as per guideline of “SAMAST” published by Forum of Regulators after taking necessary approval from Board of Directors. In line with the above plan SLDC had applied to PSDF Secretariat to consider the project proposal for funding under PSDF scheme.

After going through the project plan PSDF Secretariat has sanctioned necessary approval for funding the scheme. At present, further necessary action is being taken towards tendering and further implementation of the project.Load Management Highlights: 2019-20

A. ENERGY CONSUMPTION IN WBSEDCL SYSTEM (IN MU)

2019-20 2018-19 GROWTH(%)39599 37206 6.43%

B. ENERGY CONSUMPTION IN CESC SYSTEM (IN MU)

2019-20 2018-19 GROWTH(%)11019 10726 2.73%

C. ENERGY CONSUMPTION IN IPCL (GRID CONNECTED PART) SYSTEM (IN MU)

2019-20 2018-19 GROWTH(%)772 621 24.30%

D. ENERGY CONSUMPTION IN WEST BENGAL SYSTEM (IN MU) (Excluding the valley area served by DVC)

2019-20 2018-19 GROWTH(%)54738 53319 2.66%

E. LOAD FACTOR (%) OF WBSEDCL SYSTEM

2019-20 2018-1962.78 63.61

F. PEAK DEMAND (IN MW)

ENTITY 2019-20 2018-19 GROWTH(%)WBSEDCL 7181 6677 7.55%

CESC 2312 2123 8.90%

IPCL 128 105 22.02%

WEST BENGAL 9077 8811 3.02%

CORPORATE MONITORING CELLActivities: This Cell mainly deals with

1. Internal Technical Audit of EHV Sub-stations based on performance as per PWC Guidelines. 2. Preparation and submission of all reports on behalf of the Company as per requirement of Dept. of Power & NES and other

Departments of Government of West Bengal. 3. Preparation & submission of Monthly Technical and Financial Status Report of ongoing projects of O&M and Project Wing of the

Company to the Dept. of Power & NES, Government of West Bengal.4. Regular Monitoring of all ongoing projects of O&M, Project, Communication & IT Dept.

Achievements:Up to financial year 2019 - 2020 :

1. Round 1 Initial Technical Audit done at 8 nos. of Sub-stations and Round 2 Initial Technical Audit done at 1 Sub-station.2. Round 1 Follow-Up Audit done at 7 nos. and Round 2 Follow-Up Audit done at 49 nos. of Sub-stations. 3. Round 1 Check-Up Audit done at 14 nos. and Round 2 Check-Up Audit done at 30 nos. of Sub-stations4. Good coordination with Dept. of Power & NES, Govt. of West Bengal has been maintained by forwarding Monthly Administrative

Report as well as Technical and Financial Status Report of ongoing projects of the Company. 5. Timely submission of other reports as sought for by the Government has been made on behalf of the Company. 6. Ranking of Sub-stations as per their performance for awarding prizes to best performers has been made for the year 2018 – 2019.

Future Plan :1. Target of Technical Audit - Total nos. =133 nos. (Round 1 ITA - 5 nos. sub-stations , Round 2 ITA - 14 no sub-station, Round 1

FUA - 9 nos. sub-stations , Round 2 FUA - 1 nos. sub-station , Round 1 CUA – 8 nos. sub-stations , Round 2 CUA - 58 nos. Sub-stations, Round 3 ITA-38 nos. sub-station.)

2. Ranking of Sub-stations as per their performance for awarding prizes to best performers for the period 2019-20 will be completed by 31/12/2020.

CORPORATE SAFETY CELLActivities: WBSETCL Corporate Safety Cell has been established under Corporate to periodically review the safety performance of the Company / Construction Agencies, and advise appropriate additional measures, as required, for effective safety & accident prevention to coordinate all safety promotion & accident prevention related activities of Transmission Lines and Sub-stations under construction as well as under operation, and to provide technical support to sites for ensuring proper implementation of the Safety Policy & Procedures of the Company and applicable safety requirements during various activities.l Preparation & submission of Monthly Accident Report to competent authority.l Active participation in Safety Awareness Program in different Sub-Stations under WBSETCL.l Preparation and publication of different Manuals related to Safety of Personnel & Equipment.l Impart training on safety related issues for protection of Man & Machine to the personnel of enlisted vendors of TR- O&M.

Achievements:In the financial year 2019-20:-l 13 nos. Safety Awareness Programs were arranged in different sub-stations under various Area Offices.l No. of accidents are 04 which is same as of the previous year and no. of victims are 05 and lower than the previous year (08)l There were no fatal accidents, as of the previous year.l A committee has been constituted by the Director (HR&A), WBSETCL to prepare a safety and compensation policy of WBSETCL

with a view to address various issues related to safety and compensation of both own Employees as well as the Contractor/Agencies a detailed report has already been submitted to the Director (HR&A), WBSETCL on 30/05/2017 for implementation of the same.

l Disaster Management Manual to be followed in WBSETCL has been published in June 2019.l Five (5) nos. Training on various safety aspects to the employees of the enlisted vendors of TR- O&M has been imparted at

Kalyani Training Center and different sub-stations.l A committee has been constituted by the Director (HR&A), WBSETCL on 09/03/2019 to prepare a Transmission Safety Manual

of WBSETCL superseding the earlier Safety Manual prepared by PWC. The Report has been submitted to the Director (HR&A), WBSETCL on 13.04.2019. Publication of the Revised Transmission Safety Manual has already been done.

Future Plan :l A proposal has already been implemented for allotment of Certificate of Award to the Area Offices considering ‘Zero’ Accident in

any sub-station under control of the same Area office during each financial year started from 2017-18. Same will be followed for 2019-20.

l Proposed Safety Awareness Programme has been envisaged for at least 14 nos. of Sub-stations as per proposal to be received from respective Area Offices.

l Training on various safety aspects has been envisaged for at least 05 nos. as per requirement of Corp. HR&A wing.l Surprise safety inspection may be conducted at different Sub-stations.

PROCUREMENT DEPARTMENTThe Power transmission sector is rapidly evolving with introduction of modern technologies as well as with implementation of new business policies. To cope with the above and also to ensure quality power to all parts of Bengal at the highest availability rate , it is most essential to make available the required equipment, materials and services in right quantity and quality at right time and at right price. Procurement Department has endeavoured to achieve this difficult task through e-tendering process in the following activities for the FY 2019-20:-A. Estimated No. /Proposed No. of Order in the Year 2020-21. (Due to Lockdown condition, no tender could be floated during the period of April 2020 to June 2020)

Sl. No. Department No. of Order1. Transmission Project 102. Transmission (O&M) 25

Total 35

B. No. of Tenders in the year 2019-20- Total- 38 Nos.

Sl. No. Department No. of Tender1. Transmission Project 12 Nos.2. Transmission (O&M) 17 Nos.3. RAC 01 No4. IT 03 Nos

Total 33 Nos.

C. No. of Orders placed in the Year 2019-20- Total- 70 Nos.

Sl. No. Department No. of Order Financial Involvement (Rs.)1. Transmission Project 11 Nos. 606,00,63,090.002. Transmission (O&M) 29 Nos. 9645,12,549.663. RAC 01 Nos 24,21,360.004. IT 01 Nos 62,71,608.00

Total 42 Nos. 703,32,68,607.66D. Tender carried over from the Year 2018-19 – 09 Nos.E. Tender cancelled for the Year 2018-19 – 06 Nos.

Achievements (FY 2019-20) :1. Successfully placed Turnkey Awards for GIS and corresponding Transmission Lines to fulfil the massive electrification program

and to cater to its associated load growth throughout the state.2. Successfully procured high value equipment like Transformers, Cables and Conductors etc.3. Facilitated changes in Procurement Policy in line with various GO’s and to attract wider participation of vendors.

Future Plans (FY 2020-21) :To organize bi-annual vendor meets with an objective to share each other’s potentials and requirement, get a knowhow of latest technologies as well as to encourage wider vendor participation and further to transfer knowledge regarding WBSETCL’s future plans & prospects to the esteemed vendors.

CENTRAL PLANNING DEPARTMENTAchievements :- During this period Schemes for Gaighata 132 KV, Panpur 132 KV, Gardwani 132 KV, Nilganj 132 KV, Chandiberia 132 KV & Mondarmoni (Deposit) 132 KV GIS and upgradation of Foodpark 132 KV Sub-station to 220 KV and associated transmission lines have been finalized & TAA order has been issued after obtaining approval of BOD, WBSETCL.l Scheme for Bulk Power supply to Star Cement & Manaksia Steel Ltd. at 132 KV has been finalized during this period & TAA order

has been issued after obtaining approval of BOD, WBSETCL.l 4 nos. petitions have been submitted to the WBERC toward obtaining investment approval amounting `1179.02 Crore for

construction of 7 nos. New Sub-station, Upgradation of 3 nos. existing Sub-station to next higher voltage level, 1 no. 132/33 KV Transformers Arrangement and 110 KM (5 nos.) new Transmission lines. Another petition of `317.54 Crores has been filed during this period toward obtaining approval of WBERC to incur enhanced project cost.

l During this period, two projects of WBSETCL of total project cost of `142.10 Crore has been sanctioned for grant from PSDF by MOP, Govt of India out of which amount of grant is `102.93 Crore (total). Name of the projects are a) Installation of 5 no 400 KV Bus Reactor for reactive power management of the Grid & b) Establishment of Reliable communication & Data Acquisition system. At present 4 no projects are under implementation availing grant from PSDF.

l During the year 2019-20, earlier perspective plan was reviewed and necessary study was carried out toward preparation of Rolling Plan. Administrative approval for implementation of Annual Plan of WBSETCL for the year 2019-20 for estimated amount of `1129.54 Lakh & Rolling Plan for the period from 2020-21 to 2024-25 for estimated amount of `5997.16 Lakh has been accorded by the Board of Directors, WBSETCL in its 69th meeting held on 12th July 2019.

Target of CPD in Subsequent year :- l Finalisation of schemes for Chapra 132 KV, Habibpur 132 KV, Manikchak 132 KV, Khanakul 132 KV, Lakshmikantapur 400 KV,

Falakata 220 KV, Lolegaon 66 KV. l Review of Annual plan for the year 2020-21 & Rolling Plan up to 2024-25. Obtaining approval of BOD.l Submission of claims and monitoring i.r.o. PSDF funded Projects toward timely completion.l Issuance of TAA Orders immediately after obtaining approval from competent authority and submission of petitions to WBERC for

investment approval in case of new Transmission Project.l Compilation of Budgets provided by different departments and finalisation of the same within schedule time.

Financial Outlay for the following capital works i.r.o. different departments/ wings of WBSETCL

RE 2019-20 (Rs. in Lakh)Sl. No. Category Plan Work Outside Plan Work

1 Transmission Project

NIL

92656.002 Transmission (O&M) 25091.003 IT, SLDC, Communication & Testing 2655.004 Other Indirect Capital Expenditure 659.005 Total Expenses Capitalised 8742.00

Total 129803.00

BE 2020-21 (Rs. in Lakh)Sl. No. Category Plan Work Outside Plan Work

1 Transmission Project

NIL

116303.002 Transmission (O&M) 28010.003 IT, SLDC, Communication & Testing 5539.004 Other Indirect Capital Expenditure 1208.005 Total Expenses Capitalised 12446.00

Total 163506.00

Sl No

Category Voltage Class Number of Technical & Administrative Approval Issued

Amount (Rs. in Lakh)

1a New Sub-station / upgradation to next higher voltage and Associated Transmission System.

400, 220 & 132 6 54800.94

1b New Sub-station and Associated Transmission System (Deposit)

132 1 8537.00

2 Transmission Lines and Associated System 400, 220 & 132 5 36728.37

3 Survey for Transmission Line 14 99.254 Deposit Work 16 2890.285 Extension of new Bay 220,132,33 & 11 12 2584.326 Augmentation work at existing SS (Total 513 MVA) 400, 220 & 132 27 8090.81

7 PSDF Funded Project 400, 220 & 132 2 14210.318 Miscellaneous 400, 220 & 132 152 6550.33

Total 235 134491.61

Work Order issued during the financial year 2019-20

ENGINEERING DEPARTMENTThe department deals with engineering aspects of all technical matters accompanying the Company’s new construction work under project department and augmentation/renovation works under Transmission O&M departments. Engineering aspects related with the supply of power to the Bulk & Industrial consumers are also dealt by the department. The department introduces new/ latest technologies at a fast pace with the development of T&D practices all over the country.A. Current activities & achievement for 2019-2020:-

l Sub-station automation through SAS/SCADA.l 132 KV double circuit Monopole tower.l Implementation of NIFPS for protection of power transformer.l Implementation of 33 KV GIS double bus arrangement for better flexibility i.r.o operation and maintenance.l Implementation of Bus-Bar differential protection at downstream level of 132 KV

B. Future plans & activities for 2020-2021 with adoption of new technologies by the Engineering Department:-l Implementation of PMU at different location of transmission network of W.B. system.l Implementation of LBB protection in downstream level of 33 KV system.

REGULATORY AFFAIRS CELLActivities (2019-20): Preparation and submission of Multi Year Tariff petition for 6th control period (2018-2020) before the Hon’ble West Bengal Electricity Regulatory Commission and providing regulatory support to the management on regulatory issues. Future Plans (2020-21):

(i) Preparation and submission of Multi Year Tariff petition for 7th control period (2020-2023) before the Hon’ble West Bengal Electricity Regulatory Commission.

(ii) Submission of Annual Performance Review petitions for FY 2018-19 and FY 2019-20 before the Hon’ble West Bengal Electricity Regulatory Commission.

COMPANY SECRETARYActivities:

l To carry out and hold Board & various Committee meetings of the Company.l To give views to the Board of Directors, Auditors and Senior Level Officers on various RPTs and Inter corporate issues. l Look after entire compliance mechanism related to Companies Act, 2013 and other applicable laws to the Company.l The Office of the Company Secretary ensures that prudent corporate governance practice prevails across the Company.l The Office of the Company Secretary is also responsible for looking after various litigations in which the Company is party and

control the Legal cell of the Company.Achievements:

l Successfully completed the empanelment process of both the Cost Auditor and Secretarial Auditor of the Company.l Devising modalities for defending in the Company in various court cases, framing opinion on various corporate law issues

including matter pertaining to IBC.Future Plan:

l Feasibility study for digitization of various Statutory Registers of the Company which would ensure proper preservations of such documents.

l Digitization of the Board of Directors/Shareholders proceeding/meeting is on anvil.

CORPORATE HR&A DEPARTMENTHuman Resource Development aligning with the Organizational need is one of the basic functions of Human Resource Management to attain Organizational goals. In order to achieve and sustain superior standards of technical and managerial excellence across the organization, proper planning is required and needs to be evaluated at regular intervals. With such view to contribute towards growth of the organization the followings are planned for the FY 2020-21:-ò After completion of three recruitment processes, still there is considerable requirement of manpower in various categories in both

technical & non-technical cadre. In this respect, necessary process has already been initiated and e- tendering will be done shortly.ò In course of meeting the intuitional objectives and to motivate the employees belonging to various class and cadre under technical

and non-technical wings, promotional interview has already been planned to be conducted in time in respect of eligible employees under the organization as per Promotion Policy under CPS and vacancy based promotion.

ò After implementation of Transfer Policy like the earlier years, rational deployment of employees will be done considering both the employees as well as organizational interest.

ò To cope with the rapid changes in technology as well as in the society, there is an imperative need for every organization to impart need-based training to its employees and with such intent in-house and outside training will be arranged for the employees.

ò Apart from the Company’s own training centre at Kalyani, one new training centre has already been inaugurated and started functioning since 20th November’19 at Siliguri, mainly to cater to need-based training to different cadre of employees posted at North Bengal.

lIt is planned to arrange various non-residential training programme for various class & cadre like previous years in the Staff Training Centre at Kalyani & Siliguri.

lApart from this, initiative has already been taken for another Staff Training Centre at Kharagpur 400 KV Sub-station to train the employees of Bankura / Purulia / Purba & Paschim Midnapore.

lFurther, various outside training programmes have been planned to schedule in collaboration with various premier training institutes viz. CPRI, Bengaluru, NPTI Durgapur, RECIPMT, Hyderabad etc.

ò Like the earlier years, apprenticeship programme will be conducted for the degree/ diploma engineers under the Apprentice Act’1961.ò Initiative has already been taken to train the Contract Labourers working under the Company to enable them to obtain requisite

electrical license from the statutory body of Govt. of West Bengal. In coming year, initiative will be taken to conduct such training programme in large scale so that more number of Contract Labourers will get the benefit.

ò CSR activities have been started in a fully fledged manner considering the proposals based on the recommendations of the site offices and others within the specified guideline of the Board. In future, necessary steps will be taken to spread such activity throughout West Bengal emphasizing areas of health, promotion of education, hygiene, animal protection, holistic development, development of hospital in rural areas etc.

ò The proposed Knowledge Centre of the Company at Rajarhat is in active stage of construction.ò The labour compliances are regularly inspected and monitored by both the Project and O&M wings in line with the stipulations laid

down under various labour statutes and the process will be continued meticulously in future.ò Standard Operating Procedure for Security Management is under process.ò Apart from other employees’ welfare activities, it has been planned to organize various events/ tournaments such as Carrom,

Badminton etc. like previous year.ò Awareness camp on benefits of ESI and health check up camp for the Part-time workers will be conducted with active support from

ESI authority. ò Phase wise implementation of Bio-metric attendance of remaining units/ offices is under process and will be implemented within this

year.ò Medical benefits and services are extended to the employees and their dependants through leading hospitals in and around Kolkata.

Besides, the benefit through Gr. Medical Insurance Scheme will also be extended to the retired employees of WBSETCL in terms of RoPA’ 2020.

ò Total 19.33 acres of land has been either procured or transferred from WBSEDCL for the purpose of construction of new Sub-Stations. It is targeted to acquire 35.4021 acres of land during the FY 2020-21.

ò Corporate Communication Department is playing a pivotal role in publication of various types of advertisements in leading Newspapers. Stalls of WBSETCL had been set up at various fairs like “Kreta Suraksha Mela”, “Santiniketan Poush Mela”, “Uttar Banga Poush Mela” etc. for the purpose of branding and image building of the Company. Initiatives have also been taken to prepare Corporate Film, Telephone Directory, Coffee Table Book of WBSETCL.

ò Timely release of terminal dues from the date of retirement has been made mandatory.

COMMUNICATION DEPARTMENTCommunication Dept. has been entrusted with various responsibilities for installation, testing, commissioning and subsequent maintenance work of VHF, PLCC, SCADA system, Carrier aided protection scheme, MUX, RTU, OPGW, OFC links etc. throughout the WBSETCL network.

Achieved Projects (2019-20):A. 3696 KM of OPGW out of 3749 KM has been laid in WBSETCL network under ULDC expansion project.B. Installation and commissioning of 128 nos. SDH equipment, 208 nos. of PDH Equipment and 106 nos DCPS have been completed

under ULDC expansion project.C. Consultant has been appointed for Leasing of 06 (Six) pairs of spare dark fibres of OPGW for monetization and the process is in

progress.

D. Procurement of 96 nos. Digital Protection Coupler for 400 KV & 220 KV sub-stations is complete out of which erection of 50 nos. and commissioning of 8 nos. of DPC have been done.

Future Plans (2020-21):l 23 nos. SDH and 23 nos PDH shall be installed at different sub-stations under ULDC expansion project.l In the second phase, Digital Protection Coupler for all transmission lines shall be installed.l Under PSDF fund, 1809 KM OPGW shall be laid under WBSETCL network to strengthen the Optical Fibre Communication

System.l Replacement of 35 nos. of old RTU by new RTU under PSDF scheme shall be taken up for up-gradation of data acquisition

system.

CENTRAL TESTING DEPARTMENTAchievement :l Non numerical Relay change in 11 KV system: 96 nos. l Replacement of Total non numerical Distance Relay: 41 nos.l Replacement of Total non numerical Differential Relay: 50 nos.l Replacement of non numerical O/C Relay in phased manner: 122 nos. l Incorporation of numerical Line Differential Relay in system: 1 setl Incorporation of Remote SCADA in GIS Sub-Stn.: 3 nos.l Installation of DLMS energy meter for Energy Audit: 225 nos.l Bringing all new sub-stations, commissioned during this period, under boundary metering scheme is completed.

Activities in 2019-2020 :l Commissioning of new sub-stations, new Bay, new/augmentation of Transformer etc.l Re-commissioning of Bays, Transformer, CT, PT, CB etc.l Modification in control & relay panell Testing and repairing of relays, instruments, meters etc. l Transformer oil testing.l Preventive maintenance of protective system. l Up gradation of protection and control systeml Trouble shooting at different Sub-Stn. as per requirement.l Resolving all the issues related to Third party protection audit and any other system or protection related issues required for

integrated Grid operation, as per requirement.Future Plan :l Non numerical Relay change in 11 KV system: 40 nos. l Replacement of old numerical Distance/non numerical Directional O/C Relay in phased manner: 60 nos.l Incorporation of numerical Differential Relay for 10 MVA Tr.: 10 nos.l Replacement of non numerical Directional O/C Relay: 75 nos.l Incorporation of numerical Line Differential Relay in system: 10 setsl Incorporation of Remote SCADA in GIS Sub-Stn.: All upcoming Sub-station.l Incorporation of numerical Bus bar Differential relay at Sub-stations: 14 nos.l Installation of DLMS energy meter for Energy Audit: 200 nos.l Incorporation of DGA of Tr. Oil at Siliguri: 1 set.l Incorporation of Furanic compound test of Tr. Oil: 1 setl Resolving all the issues related to Third party protection audit and any other system or protection related issues required for

integrated Grid operation, as required.l Regular testing activities like commissioning of sub-stations, trouble shooting, preventive maintenance of protective system, up

gradation of protection and control system, transformer oil testing, modification in control & relay panel, testing and repairing of relays, instruments, meters etc.

INTERNAL AUDIT DEPARTMENTRelating to Internal Audit :ò Total no. of units audited against those approved for being audited as per approved plan up to 31.03.2020

Sl No Particulars Approved Actual1 Accounting Unit Offices 21 212 Store Units 64 643 Field Zonal Office 6 64 HQ Units 1 1

ò All Accounting Units/Area Offices (27 Nos.), Store Units (80 Nos.), Head Quarter Units (12 Nos.) and Field Zonal Office (8 Nos.) under WBSETCL’s jurisdiction are covered under Audit Plan 2019-20 and scheduled for completion by 19.06.2020.

Relating to Government Audit (During 2019-20) :

Particulars Received (nos.) Replied (nos.) Settled (nos.) Remarks

Report 9 4 0 Remaining units are in the process of finalizing reply and would be submitted shortly.

ParasPart IIA 2 0 0

Part IIB 36 20 01Additional 02 nos. Para (Part IIA) and 14 nos. (Part IIB) pertaining to the period 2014-15 to 2018-19 have been settled during 2019-20.

COPU Para NIL

Government AuditGovt. audit is planned & executed by resident wing of CAG. Internal Audit deptt. Coordinates, compiles (in case of Part IIA para) and ensures timely submission of replies to CAG on behalf of the company.

a. Inspection Report paras will be monitored for being replied by the concerned units as and when received.

b. Internal Audit will facilitate the concerned unit in finalizing the Draft replies of Part IIA paras of C & AG Reports for the year 2019-20 and 2020-21 for ensuring timely submission of the same from the units.

c. Follow-up and draft reply of part IIB will be facilitated for being furnished by the units as and when required.

d. C& AG Office would be pursued for conductance of Audit Committee Meeting for threadbare discussion on Old Unsettled Paras of different Units based on their current status for settlement.

Future Plan :

Internal AuditWith a view to sustain the increased Audit Coverage it has been planned to cover all the Auditable Units in 2020-21 as depicted below

a. No. of Units to be audited :- 127 Unitsb. Percentage of audit coverage in 2020-21 (as against no. of auditable units) 100.00c. No. of processes to be audited :- 682 Nos.

CORPORATE (FINANCE & ACCOUNTS) Targets: ` in Lakhsl To achieve a Capex : `163506 Lakhs (including expenses capitalized)l To generate operating income : `162595 Lakhsl To achieve a profit of : `53111 Lakhsl Timely servicing of debt obligation to enhance/retain the good credit rating of the company. l To move ahead in implementing SAP in retirement benefit cell. l To introduce Quarterly Budget Review. l Timely servicing of Retirement dues to the employees of the company.

IT DEPARTMENT1. The SAP-ERP ICT infrastructure on Cloud based platform has gone-live on 04.07.2019 and the rest of the works, particularly

installation of MPLS-VPN connectivity in some locations of WBSETCL are ongoing.

2. The SAP-ERP Solution has gone live on 04.07.2019 to the Cloud based Infrastructure in collaboration with the Implementation Partner and WBSETCL functional officials.

3. Helpdesk facilities for SAP-ERP and MPLS-VPN have been setup for early and smooth resolution of issues.

4. Technical interfacing and coordinating with NIC and vendor will continue for system operation and further needs of e-procurement and registration of digital signatures in WBSETCL.

5. Annual Maintenance contract, system operation and monitoring of the bio-metric attendance system at Vidyut Bhawan and other 27 area offices of WBSETCL will continue in collaboration with Facility & Logistic Cell and system vendor.

6. Preparation of technical specifications and vetting i.r.o IT related procurement of various departments will continue along with interaction and coordination with vendor i.r.o AMC of server hardware and software installed at Corporate Finance Department.

7. The tendering process for redesigning, developing, hosting and maintenance of corporate website of WBSETCL is underway, which will have new enhanced features like responsiveness, dynamicity and many more.

8. The tendering process for procurement, operation and maintenance of corporate email service along with the backup server is underway. The new corporate e-mail service will come with more storage space and many other advanced features.

9. Coordination and System monitoring i.r.o existing Corporate E-Mailing Services is carried out and the service will be enhanced for serving further document management needs of user departments.

10. The in house development of Apprentice recruitment portal is under process, as per functional requirements of Corporate (HR&A) department.

11. Training programmes related to operation of SAP-ERP and MPLS-VPN connectivity are conducted time to time.