SITE ID Indus ID 3434 Dec Indus IN-1025581 AAL grow 3644 Dec INDUS IN-1069379 AAL grow 5661 Dec Indus IN-1119584 AAL grow 5807 Dec Indus IN-1242530 AAL grow 5807 Dec Indus IN-1242530 AAL grow 6089 Dec Indus IN-1132129 AAL grow 6526 Dec Indus IN-1124875 AAL grow 1374 Dec Indus IN-1026444 AAL grow 4075 Dec Indus IN-1055803 AAL grow 6380 Dec Indus IN-1248993 AAL grow 3728 Dec Non-Indus N/A AAL grow Allocati on Month IP Provider Project Category - Dec 14

Transcript of VISIT Updation Dec

SITE ID Indus ID

3434 Dec Indus IN-1025581 AAL grow3644 Dec INDUS IN-1069379 AAL grow5661 Dec Indus IN-1119584 AAL grow5807 Dec Indus IN-1242530 AAL grow5807 Dec Indus IN-1242530 AAL grow6089 Dec Indus IN-1132129 AAL grow6526 Dec Indus IN-1124875 AAL grow1374 Dec Indus IN-1026444 AAL grow4075 Dec Indus IN-1055803 AAL grow6380 Dec Indus IN-1248993 AAL grow3728 Dec Non-Indus N/A AAL grow

Allocation Month

IP Provider

Project Category - Dec 14

Site Name

Oshiwara Akash ganga Anand_BuildingHamirmahalBay VeiwBay VeiwJasmine

Sai Mangal B-WingThakur Vidya Mandir

BRIJWASI-11/02Bismillah Appartment

Bharat Diamond Bourse.Tower-4(Sharing with UBICO)

Address

New Link Road, Jogeshwari (W), Mumbai-4001023644,Anand Building,CHHEDA ANAND APARTMENT, BEHIND LODA COMPLEX,NAYA NAGAR POLICE CHOKI,MEERA Rd EAST,MUMBAI-401107

Mumbai - OnAir - H-Hamirmal Complex - BHAYANDER-1003BAY VIEW,KHARODI,MARVE ROAD, MARVE,MALAD(W).BAY VIEW,KHARODI,MARVE ROAD, MARVE,MALAD(W).

Jasmine Appt, Nr Deccan, SV road Andheri(W), MumbaiSai Mangal Co-op Housing Society,Bldg No-2,B Wing,Ajgaonkar Plot,Near Asmita School,W.E Highway,Jogeshwari(E)Mumbai.

1374,Thakur Vidya Mandir,Building no.2, Thakur Complex, Kandivli EastBrijwasi Estate, Sonawala Road, Goregaon East, Mumbai - 400 063.

Bismillah Appartment,Near Vir Savarkar Road,Mahim,Mumbai.Near NABARD, Bharat Diamond Bourse , BKC Road , BKC Bandra, Mumbai

Vendor First Visit Reason Engineer Name

11-Dec-14 Vedang Done I&C And Integrate Rajesh11-Dec-14 Vedang Done Material Recievind But I&C Issue Team11-Dec-14 Vedang Done Material Recievind But I&C Issue Team11-Dec-14 Vedang Done Material Receive ,I&C Complete But EVEN Issue Team11-Dec-14 Vedang Done Material Receive ,I&C Complete But EVEN Issue Team11-Dec-14 Vedang Done MRF Hold due to 15/8 Cable15-Dec-14 Vedang DoneMaterial Receive ,I&C Complete But Andrew Connector faulty Team15-Dec-14 Vedang Done I&C And Integrate Ezaz15-Dec-14 Vedang Done Material Recievind But I&C Issue Team15-Dec-14 Vedang Done Material Recievind But I&C Issue Team15-Dec-14 Vedang Done

RFAI  Date

Survey Status

Second Visit Reason Engineer Name Third Visit Reason Engineer Name

I&C And Integrate,TRX Faulty Ezaz Faulty Trx Change,Integrate EZAZI&C,EVEN Issue Team

Faulty Connector Changed And Integrate Team

I&C Complete But EVEN Issue Team

Fourth Visit Reason Engineer NameFifth Visit Reason Engineer Name

Sixth Visit ReasonEngineer NameTotal Visits

SITE ID Indus ID Site Name

4298 Nov INDUS INDUS 2G+3G AMI DHARA5012 Nov INDUS INDUS 2G+3G Pandurang Bhavan3183 Nov INDUS INDUS 2G+3G Cosmo Politian6382 Nov INDUS INDUS 2G+3G Clove Bar and Grill3129 Nov INDUS IN-1102701 2G+3G Tulasi Chambers

5093 Nov INDUS INDUS 2G+3G SAI PROVISO UTTARA TOWER4741 Nov INDUS INDUS 2G+3G Manish Sunflower5474 Nov INDUS Airtel 2G+3G Santacruz_Flyover3527 Nov INDUS Airtel 2G+3G GOVERNER'S SECRETARIAT OFFICE5459 Dec INDUS Airtel 2G+3G Mulund_north2263 Dec INDUS Airtel 2G+3G Choice Solutions

Allocation Month

IP Provider

Project Category - Dec 14

Address

NovPanddurang, Lady Jamsehdji Road, Matunga (W), Mumbai Nov

Malvika Bld, Opp Cosmopolitian School, DN Nagar, Andheri (W) NovCLOVE BAR AND GRILL,PALI HILL,BANDRA(W) Nov

Mumbai - IBS - T-TULSIANI CHAMBERS - NARIMAN POINT Nov

Sai Provise Uttna Tower,Plot No-11 - 12,Sec -50,Nerul-400706 NovA-wing,four bunglow,andheri-w Nov

Santacruz Flyover - 2,Santacruz(E),Mumbai Nov

GOVERNER'S SECRETARIAT OFFICE, Raj Bhawan, Walkeshwar Road, Walkeshwar, Mumbai NovMulund Flyover,Mulund,Mumbai Dec

Choice Solutions Dec

RFAI  Month

 Station Road, Bhayandar (W), Dist. Thane.

Vendor First Visit Reason Engineer Name

Vedang Done I&C Complete But EVEN Issue in 2G ,3G Integrate Rajesh

Vedang Done SRN Access Issue,Team Return TeamVedang DoneI&C Complete But EVEN Issue in 2G ,3G Integrate,ESEA ShortageAbdulVedang Done HoldVedang Done I&C Complete ,Integrate RajeshVedang Done I&C Complete ,3G Integrate But Power Issue ShankarVedang Done MRF Hold due to MIMO Implemented N/AVedang Done MRF Hold due to MCB Issue N/AVedang Done Material Receive But Antenna Port Faulty,I&C Pending RajeshVedang Done MRF Hold Due to Installed By Other VendorVedang DoneMaterial Rreceive But ESEA Bus cable Shortage ,Discuss with Bablu

Survey Status

Second Visit Reason Engineer Name

ESEA Receive ,Integrate But TRX Faulty Rajesh

2G Integrate on TEST OMU But Creation Wrong Tukaram

Again Antenna Damaged,Integration Pending Ezaz

ESEA Recived And Installed And Integrate than TRX Faulty Ezaz

Third Visit Reason Engineer Name Fourth Visit Reason Engineer Name

Faulty TRX Changed Rajesh

I&C Completed And Integrate Rajesh

Fifth Visit Reason Engineer Name Sixth Visit ReasonEngineer NameTotal Visits

Total Visits

SITE ID Indus ID Site Name

3896 Nov INDUS INDUS 3G Sect Add CEIM Industrial ESTATE5014 Oct Airtel Airtel 3G Sect Add Axis_Bank_Gigaplex1773 Nov Airtel Airtel 3G Sect Add URMI ESTATE IT PARK (PHASE 2)

4479 Nov INDUS INDUS 3G Sect Add KK Bakery3947 Nov Airtel Airtel 3G Sect Add Accenture3907 Nov Airtel Airtel 3G Sect Add Lodha_I

3932 Nov Airtel Airtel 3G Sect Add Vivacity Mall - RHS3223 Nov Airtel Airtel 3G Sect Add MUMTUNGPARAIFI12462 Nov Airtel Airtel 3G Sect Add Corporate_Arena351 Nov Airtel Airtel 3G Sect Add IIT POWAI-DRDO BUILDING2762 Dec Airtel Airtel 3G Sect Add MUMKENSINTCIMI12063 Dec Airtel Airtel 3G Sect Add GRAND HYATT2063 Dec Airtel Airtel 3G Sect Add GRAND HYATT942 Dec Airtel Airtel 3G Sect Add NESCO IT PARK313 Dec Airtel Airtel 3G Sect Add GROWELL MALL1414 Dec INDUS IN-1056338 3G Sect Add PRASHANT

1740 Dec Airtel Airtel 3G Sect Add Times Sqaure IBS

Site Allocation Month

IP Provider

Project Category - Dec 14

Address

CIEM Industrial Area Estate, Kachpada, Malad, MumbaiAxis Bank, NPC 1, Building No. 1, Gigaplex, Plot No. I.T. 5, MIDC, Airoli Knowledge Park

95 ganpatrao kadam marg, Lower parel, Mumbai - 400013K.H.Khans(KK Bakery), K.H Timber Mort, Kurar Village,, Next To Laxman Nagar Chowky, Malad (E),Mumbai-97.

Accenture , Vi33oli (WEST ) ,Mumabi.subhash nagar, Pokran road2, Majiwada, near Voltas HR training center and TCS, Thane W

Vivacity Mall - RHS, Eastern Express high, near Jupiter Hospital, Thane(west)Hotel Tunga Paradise, Central Road, MIDC Area, Andheri (E), Mumbai.

Behind piramal nagar Goregaon(w),MumbaiIndian Institute of TechnologyPowai

Kensington (TCS 8, 9 10 Floor) Bldg, Hiranandani Powai.Off Western Express Highway, Santacruz East Santacruz, Mumbai, Maharastra 400055Off Western Express Highway, Santacruz East Santacruz, Mumbai, Maharastra 400055

942,NESCO IT PARK,Nesco IT Park Bldg No-3, Off Western Express Highway, Goregaon East.313, GROWELS PHASE-2, W-EXPRESS HIGHWAY KANDIVALI ( E ) MUMBAI

Ashok Chakravarty Road, Kandivali (E), Mumbai - 400 101.

Andheri kurla rd, near sanjay mittal industrial estate, Andheri E

Vendor First Visit Reason Engineer Name

Nov Vedang Done I&C Complete And Integrated EzazOct Vedang Done IBS Integrate DevoNov Vedang Done Hold MRF By RupeshNov Vedang Done Hold MRF Because MIMO ImplementedNov Vedang Done 3G Commissoned But RF Module Failur EzazNov Vedang Done Hold MRF By RupeshNov Vedang Done I&C Complete And Integrated RajeshNov Vedang Done I&C Complete And Integrated EzazNov Vedang Done I&C Complete And Integrated EzazNov Vedang Done I&C Complete And Integrated RajeshDec Vedang Done IBS Integrate RajeshDec Vedang Done I&C Completed,Integration Done EzazDec Vedang Done I&C Completed,Integration Done RajeshDec Vedang Done Integrate IBS Sectors SagarDec Vedang Done Hold MRF Because Infra PendingDec Vedang Done I&C Complete But Cretaion Pending EzazDec Vedang Done I&C Completed,Integration Done Shrikant

RFAI  Date

Survey Status

Second Visit Reason Engineer Name Third Visit Reason Engineer Name

Fourth Visit Reason Engineer NameFifth Visit Reason Engineer Name

Sixth Visit ReasonEngineer NameTotal Visits

SITE ID Indus ID Site Name

1459 Nov IN-1055948 Indus Only 2G GOLDEN SANDS2004 Nov Airtel Airtel Only 2G Breachcandy Hospital2227 Nov Airtel Airtel Only 2G SEEPZ-SDF- 53307 Nov Airtel Airtel Only 2G MEHTAESTATE962 Dec Airtel Airtel Only 2G Everest Nivara

Dec Airtel Airtel Only 2G Breach Candy Hospital

Allocation Month

IP Provider

Project Category - Dec 14

Address Vendor

Gorai Nagar, Gorai Nov Vedang DoneOpp. Breach Candy Hospital, Bhulabhai Desai Road. Nov Vedang Done

SDF 5, Seepz,Andheri (E), Mumbai Nov Vedang Done

Mehta House, 13th Road, MIDC Marol, Andheri (E), Mumbai Nov Vedang Done

Everest Nivara InfoTech Park 1, Plot No. D3, Indira Nagar, Faizer Road, Turbhe., TURBHEDec Vedang Done

Opp. Breach Candy Hospital, Bhulabhai Desai Road. Dec Vedang Done

RFAI  Date

Survey Status

First Visit Reason Engineer Name

I&C Complete And Integrate RajeshIBS Integarte Devo

Material Not Receive ,Due to access Issue TeamHold MRF Due to MR Swap Plan N/A

Material Receive ZUBER

Second Visit Reason

Material Received And I&C Pendind Due to One Sctor antenna Issue for installation,And E1 Issue And Integration Pending

Engineer Name Third Visit Reason Engineer Name Fourth Visit Reason

Ezaz

Engineer NameFifth Visit Reason Engineer NameSixth Visit Reason

Engineer NameTotal Visits

SITE ID Indus ID Address Vendor IP Provider

Project Category - Dec 14

Site Name

RFAI  Date

First Visit Reason

Engineer Name Second Visit Reason Engineer Name Third Visit Reason

Engineer Name Fourth Visit Reason Engineer NameFifth Visit Reason

Engineer Name Sixth Visit ReasonEngineer NameTotal Visits

SITE ID Site Name Address Vendor

86 ATC New Site Sahara Star Hotel Done Vedang161 ATC New Site Kailash Prabhat Done Vedang197 VIOM New Site Jai Bonanja Done Vedang199 VIOM New Site Nisarg Heaven Done Vedang305 Indus New Site Paradise Done Vedang324 Indus New Site Regal Apartment Done Vedang331 Indus New Site Hem Dil Done Vedang485 Indus New Site Durga Mata Foundation Done Vedang1706 Indus New Site DSK Sarswati Done Vedang2017 VIOM New Site Attaullah Khan Done Vedang2763 Indus New Site Bayculla House Done Vedang3675 VIOM New Site Om Shiv Shakti Done Vedang3687 Indus New Site Suyog Apartment Done Vedang3758 Indus New Site Pam Spring Done Vedang3853 Indus New Site Narmada Palace Done Vedang5041 Indus New Site Sweet Home Done Vedang5457 Indus New Site Sharda Gram Done Vedang5516 Indus New Site Bandra Urdu Done Vedang5669 Indus New Site Aryan High School Done Vedang5606 Indus New Site Commercial Chamber Done Vedang6191 Indus New Site Cow Satsang Done Vedang4749 Indus New Site Shashi Apt Done Vedang6488 Indus New Site ISLAullah Masjid Done Vedang4670 ATC New Site LIC Colony Done Vedang4970 Indus New Site Shasray BLDG Done Vedang5788 Indus New Site Mujjamil House Done Vedang4389 Indus New Site Arihant Done Vedang5783 Indus New Site Shah Industrial State Done Vedang278 Indus New Site Tech Web Center Done Vedang5826 Indus New Site Park Plaza Done Vedang2429 Indus New Site MAZGaon Central Cabin Done Vedang4460 Indus New Site Bayculla Station Done Vedang4435 Indus New Site Dadar Staation Done Vedang5604 Indus New Site Shop No 114 Done Vedang3823 Indus New Site Shiv Bhaktani Done Vedang5734 Indus New Site Parishram Done Vedang4895 Indus New Site Sai Riddhi N/A N/A598 Indus New Site Goldan Chamber N/A N/A

IP Provider

Project Category - Dec 14

RFAI  Date

Engineer Name

Material receiveTeam+EngineerMaterial receiveTeam+EngineerMaterial receiveTeam+EngineerMaterial receiveTeam+EngineerMaterial receiveTeam+EngineerMaterial receiveTeam+EngineerMaterial receiveTeam+EngineerMaterial receiveTeam+EngineerMaterial receiveTeam+EngineerMaterial receiveTeam+EngineerMaterial receiveTeam+EngineerMaterial receiveTeam+EngineerMaterial receiveTeam+EngineerMaterial receiveTeam+EngineerMaterial receiveTeam+EngineerMaterial receiveTeam+EngineerMaterial receiveTeam+EngineerMaterial receiveTeam+EngineerMaterial receiveTeam+EngineerMaterial receiveTeam+EngineerMaterial receiveTeam+EngineerMaterial receiveTeam+EngineerMaterial receiveTeam+EngineerMaterial Not RecTeam+EngineerMaterial receiveTeam+EngineerMaterial Not RecTeam+EngineerMaterial receiveTeam+EngineerMaterial receiveTeam+EngineerMaterial receiveTeam+EngineerMaterial receiveTeam+Engineer

Material receiveTeam+EngineerN/A N/AN/A N/A

First Visit Reason

Second Visit Reason Engineer Name

I&C WIP TanveerI&C WIP EzazI&C WIP Infra Pending SagarI&C WIP Infra Pending TukaramI&C WIP PiyushI&C Complete DeepakI&C WIP Infra Pending RajeshI&C WIP TanveerI&C WIP Infra Pending Due to POOL BTS not Dismental And InEzazI&C WIP SagarI&C WIP TukaramI&C WIP PiyushI&C WIP DeepakI&C WIP Infra Pending RajeshI&C Complete But Plan Change, Site On Diplexer PiyushI&C WIP TanveerI&C WIP EzazI&C WIP SagarI&C Complete ,Integrate TukaramI&C WIP PiyushI&C WIP DeepakI&C WIP RajeshI&C WIP Tanveer

I&C WIP Sagar

I&C WIP PiyushI&C WIP DeepakI&C WIP RajeshI&C WIP Tanveer

I&C WIP RajeshRectification(System Module Changed) TanveerRectification Ezaz

TanveerEzaz

SagarTukaramPiyushDeepakRajesh

Third Visit Reason Engineer Name

I&C Complete RajeshI&C Complete TanveerI&C WIP Agin Infra Pending(DCDB Rock STACK) EzazI&C WIP Agin Infra Pending SagarI&C Complete TukaramAlarm Rectification PiyushI&C WIP Agin Infra Pending(DCDB,Offset Pole RequiredDeepakI&C Complete RajeshI&C WIP Agin Infra Pending(DCDB,Offset Pole RequiredTanveerI&C Complete EzazI&C Complete SagarI&C Complete TukaramI&C Complete PiyushI&C WIP Agin Infra Pending DeepakInfra Issue RajeshI&C WIP Due to Far End Access Issue TanveerAntenna Infra Issue Resolved I&C Completed EzazI&C WIP Due to Access Issue (Namaj) SagarAlarm Rectification TukaramI&C Complete PiyushI&C WIP Infra Pending DeepakI&C WIP Infra Pending RajeshI&C WIP Tanveer

I&C WIP Access Issue Sagar

I&C WIP Infra Pending(LOOP Antenna Not Relocate PiyushI&C Complete DeepakI&C WIP Infra Pending RajeshI&C Complete Tanveer

I&C Complete RajeshRectification Due To creation Pending TanveerAgain Rectification Ezaz

Fourth Visit Reason Engineer Name

Alarm Rectification RajeshLink Material Receive Shortage AwaiteTanveerI&C Complete EzazI&C Complete SagarLink material Receive TukaramAlarm Rectification PiyushI&C WIP Again Power Issue DeepakSite Not Integrate Due to E1 Issue RajeshI&C WIP Again Power Issue TanveerLink material Receive EzazLink Material Receive SagarLink Material Awaited Due to access ITukaramLink Material Receive,But Wrong MaterPiyushI&C Complete But Power Issue DeepakAgain Infra Issue not Resolver RajeshI&C WIP Due to Again Far End Access TanveerLink Near And Far IDU Faulty EzazI&C Completed But E1 Pending Sagar

Link material Receive PiyushI&C Complete DeepakI&C Complete RajeshI&C Complete Tanveer

I&C WIP Again Access Issue Sagar

I&C Complete PiyushI&C Completed Integrate On Test OMU DeepakI&C Complete RajeshLink Material Awaited Tanveer

Link Material Recive Shortage AwaitedRajeshRectification Due To Again creation PTanveer

Fifth Visit Reason Engineer Name

Again Alarm Rectification RajeshLink Shortage Material Received TanveerLink Material Receive Shortage Awaited EzazLink material Receive SagarLINK I&C Completed CRF And DATA Fill Pending TukaramSite Down Due to Power Issue PiyushAlarm Rectification DeepakSite Not Integrate Due to Again E1 Issue RajeshI&C Completed TanveerBTSLocation I&C Plan Changed Again I&C WIP EzazI&C Pending Due to Far End Access Issue (Link)SagarLink Material Awaited Due to Again access IssuTukaramShortage Link Material Receive PiyushPower Taping Taping Complete Deepak3G RF Module Faulty RajeshFar End Material Awaited Till Tanveer Rectification,Because Site Integrate On Test EzazSite Not Integrate Due to Again E1 Issue Sagar

LINK I&C Completed PiyushAlarm Rectification DeepakLink Material Receive Shortage Awaited RajeshI&C Completed But E1 Pending Tanveer

Alarm Rectification PiyushSite Integrate DeepakI&C Completed But E1 Pending Rajesh

Shortage Material Receive RajeshSite Integrate Tanveer

Sixth Visit Reason Engineer Name

Link Shortage Material Received RajeshLINK I&C Completed TanveerAgain IDU Used by Other Site by NSN Team Ezaz

Alarm Rectification PiyushAlarm Rectification Due to Power Issue DeepakBTS I&C Done RajeshI&C WIP Because Connector Faulty TanveerAGAIN BTS Location Plan Survey(Joint VISIT SurveEzazLINK I&C Done SagarLink Shortage Material Received TukaramAgain 3G System Module Changed Piyush

Site Integrate Tanveer

Alarm Rectification Rajesh

Link I&C Done EzazSite Integrate Sagar

I&C Completed ButAgain E1 Pending Ezaz

Link I&C Done Ezaz

Seven VISIT Engineer Name

IDU Instaleed Link Done But RMC Card Faulty Tanveer

Alarm Rectification Due toAgain Power Issue EzazLINK I&C Done SagarFaulty Connector Received And I&C Complte TukaramAGAIN BTS Location Plan Survey(Joint VISIT Survey) Survey DoPiyushRF Module Faulty 2G Changed DeepakAgain Link Shortage Material Received RajeshLink Material Received Shortage Awaited Tanveer

Alarm Rectification(Site Not Created Tukaram

Alarm Rectification Ezaz

Site Integrate Piyush

Eight Visit Ninth VISIT

Site Not Integrate Due to ODU Piyush

Alarm Rectification Sagar

Link Material Received Piyush 3G Shortage Material ReceivedEzaz

Link I&C Done Rajesh Site Not Integrate due to E1 TukaramShortage Material Recived(Lin Tanveer

Alarm Rectification(Malfrequnc Tukaram

Tenth VISIT

Site Integrate