The State of Uttarakhand, often called “Devbhoomi”, is a popular destination for religious and adventure tourism. A network of stronger, safer, all weather roads is being built, in the State over the past four years. Till 2014, the length of National Highways was 2,509 km. In 2018, NH length has reached 3,492 km.
The completion of the Delhi-Meerut Expressway and Delhi Saharanpur Highway will result in greater savings in time, cost and fuel for Uttarakhand bound vehicles. Over Rs. 5,000 Cr will be invested to build 983 km of new National Highways. Work is in progress on 66 projects worth Rs. 12,300 Cr, spanning a length of 800 km. Under Chardham programme, 37 projects of 633 km length, worth a total cost of Rs. 8,500 Cr have been sanctioned. Out of these 23 projects of 385 km length worth Rs. 4,100 Cr are ongoing and the remaining ones are at tender/award stage. A total of Rs. 30,000 Cr worth investments will be made towards road development in the State.
UTTARAKHAND
UTTARAKHAND
Uttar Pradesh
Haryana
Punjab
Himachal Pradesh
“When a network of good roads is created, the economy of the country also picks up pace. Roads are veins and arteries of the nation, which help to transform the pace of development and ensure that prosperity reaches the farthest corners of our nation.”
NARENDRA MODI Prime Minister
“In the past four years, we have expanded the length of Indian National Highways to 1,26,350 km. The highway sector has seen a 20% growth between 2014 and 2018. Tourist destinations have come closer. Border, tribal and backward areas are being connected seamlessly. Multimodal integration through road, rail and port connectivity is creating socio economic growth and new opportunities for the people.
In the coming years, we have planned projects with investments worth over Rs. 6 lakh crore, to further expand the world’s second largest road network.”
NITIN GADKARI Union Minister, Ministry of Road Transport & Highways, Shipping and Water Resources, River Development & Ganga Rejuvenation
NH + IN PRINCIPLE NH LENGTH UPTO YEAR 2018
3,542 km
NH LENGTH UPTO YEAR 2014
2,282 km
Fast tracking National Highway development in Uttarakhand
Adding new National Highwaysin Uttarakhand
Yr 2010 - 2014
New NH New NH & In principle NH length
Yr 2014 - 2018
240 km1,160 km
6
Construction of roadsin Uttarakhand
Constructed length
Constructed length
846 km of National Highways have been built in 4 years
Yr 2010 - 2014Yr 2014 - 2018
144 km846 km
7
Road Projects awarded in Uttarakhand
1,644.09 km497.04 km
Yr 2010 - 2014 Yr 2014 - 2018
Growth of 230% in the awarded length of road projects over last 4 years with investments worth Rs. 9,661.29 Cr
Total CostRs. 11,284.17 Cr
Total CostRs. 9,661.29 Cr
8
5Projects
22Projects
Yr 2010 - 2014Yr 2014 - 2018
Significant increase of 164% in cost of CRF works sanctioned for the upgradation & improvement of roads /bridges in the State
Accelerated NH Development under Central Road Fund (CRF)in Uttarakhand
Total CostRs. 113.56 Cr
Total CostRs. 300.32 Cr
9
16 Bypasses
2 Tunnels
25 Major bridges
39 Landslide Mitigative projects
3 Viaducts
18 Wayside amenities
154 Bus stands / Bus-bays/truck laybys
To ensure safety and comfort of travellers in the Char Dham, the following provisions are being made:
Char Dham National Highway Development ProgrammeAfter the natural calamity in Uttarakhand, the roads to the Char Dham were in a bad condition. Despite being the spiritual heart of India, these roads had not been developed until four years ago. The route would remain cut o¢ at many places during the rainy season due to heavy landslides.
Integrated development of the Char Dham has been planned as a solution to these challenges. Projects spanning 900 km of National Highways worth Rs. 12,000 Cr are being developed to bring safe, all weather connectivity to the region. The new highways will be 2 laned with paved shoulders and a minimum width of 10 m.
• On completion of the Char Dham project, Gangotri, Yamunotri, Kedarnath and Badrinath will be safely connected to Rishikesh
• 37 projects of 633 km length, worth Rs. 8,500 Cr have been sanctioned till date
• The project will be completed in 2019
11
Status of ongoing projects under Char Dham
Sl. No.
Name of the Project Length (in km)
Sanctioned Amount (Rs. In Cr)
1 Widening of existing single lane road to two lane with paved shoulders configuration from km 235.00 to 268.00 on Rishikesh –Rudraprayag Section of NH-58 (New NH No. 07) including 600.00 m Marine Drive viaduct portion near Byasi
30.80 248.22
2 Reconstruction with geometric improvement of existing 2 lane/intermediate lane to 2 lane with paved shoulder configuration from km. 268.00 to 300.00 on Rishikesh –Rudraprayag Section of NH-58 (New NH No. 07)
32.00 200.34
3 Treatment of Landslide Hazard Zones of Saknidhar (km. 277.750 to 277.950), Devprayag Sinking Zone (km. 297.100 to 297.300), Srinagar River Bank Protection (km. 329.400 to 330.100) on Rishikesh –Rudraprayag Section of NH-58 (New NH No. 07)
1.1 75.90
4 Reconstruction with geometric improvement of existing 2 lane/intermediate lane to 2 lane with paved shoulder configuration from km. 300.00 to 338.00 on Rishikesh –Rudraprayag Section of NH-58 (New NH No. 07)
38.00 257.34
5 Construction of 2-lane with paved shoulders configuration & strengthening on Rishikesh –Rudraprayag Section of NH-58 (New NH No. 07) from km 350.00 to km 355.00 (kaliyasaur re-alignment)
3.75 + 3 Bridge
148.02
6 Mitigation of Lambagarh Landslide zone at Km 504.309 on Rudraprayag -Manna village Section of NH-58 (New NH No. 07)
0.5 107.68
7 Rehabilitation/treatment of landslide locations with slope protection and drainage improvement at (i) Nandprayag (km. 420+400), Maithana (km. 423+500), Birahi (km.437+400) & Gulabkothi (km.464+400), on Rudraprayag -Manna village Section of NH-58
0.76 57.66
8 Rehabilitation/Treatment of landslide location with slope protection and drainage improvement at Helang (Km 468+150), Govindghat-II (Km 497+000) and Govindghat-III (Km 500+000) on Rudraprayag -Manna village Section of NH-58 with approx. proposed length of 275m, 150m & 150m respectively
0.58 45.09
9 Reconstruction with Geometric Improvement of existing Intermediate Lane to 2 Lane with Paved shoulder Configuration from Km 1.957 to Km 28.600 Excluding Narendra Nagar by pass (Km 13.800 to Km 18.550) on Rishikesh Dharasu section of NH-94
21.48 208.89
10 Reconstruction with Geometric Improvement of Existing Intermediate Lane to 2 Lane with Paved Shoulder Configuration from Km 28.600 to Km 59.420 (Design Ch. 28.320 to 58.603) on Rishikesh Dharasu section of NH-94
30.28 331.33
11 Protection works at Nalupani landslide (Ex. Km. 123+080 to km.123+480, km 123+665 to km 123+740 and km 123+970 of NH-34 on Dharasu -Gangotri section
0.675 41.00
12 Construction of Road Bridge and Slope Protection works of landslide at Bareti (Ex Km. 100.300 to Km.101.060 of NH-34 on Dharasu -Gangotri section
0.76 32
13 Rehabilitation and Up gradation to 02 lane with paved shoulder configuration from existing Km 122.00 (Dharasu Band) to Km 147.23 (Silkyara Band) (Design Chainage Km 0.00 to Km 24.30) of NH-94 on Dharasu -Yamunotri section
24.30 237.80
14 Improvement/Widening to 2 lane /2 lane with paved shoulders including Major Bridge & protection work of paligaad market on Hill side and Valley side from Km 196.00 to 197.00 on NH-94 (New No. 134 on Dharasu -Yamunotri section
1.00 33.40
15 Widening and Strengthening of existing intermediate /2-lane to 2-lane with paved shoulder configuration from km 0.00 (Design km 0.00) to km 16.440 (Design km 18.700 ) including existing 3.470 km of Rudraprayag Bypass of NH-109
16.40 141.47
13
Status of ongoing projects under Char Dham
Sl. No.
Name of the Project Length (in km)
Sanctioned Amount (Rs. In Cr)
16 Reconstruction with geometric improvement of existing single/intermediate lane to 2 lane to 2 lane with earthen shoulder configuration from existing km 16.545 to km 33.130 & km 41.260 to km 57.975 (design chainage 18.700 to km 35.130 & km 47.700 to km 63.700 ) of NH -109 on Rudraprayag -Gaurikund section
32.43 418.79
17 Construction of Kund Bypass from Existing Km 33+130 to Km 41+260 (Existing Length: 8.130 Km); Design Chainage: Km 35+130 to Km 47+700 (Design Length: 12.570 Km) for NH-109 on Rudraprayag -Gaurikund section
12.57 248.003
18 Widening and strengthening of existing single lane to 2 lane with earthen shoulder configuration from km 57.975 to 68.600 on NH-109 on Rudraprayag -Gaurikund section
10.63 95.58
19 Reconstruction with geometric improvement of two-lane to 2 lane with paved shoulder configuration from exisiting km 52.200 to km 92.880 (Tanakpur to Belkhet) of NH-125
39.73 282.08
20 Reconstruction with geometric improvement of two-lane to 2 lane with paved shoulder configuration from exisiting km 92.880 to km 121.550 (Belkhet to Champawat) of NH-125 .
28.12 266.52
21 Reconstruction with geometric improvement of existing two-lane to 2 lane with paved shoulder configuration from exisiting km 126.730 to km 135.075 (Champawat to Lohaghat) & existing km 143.750 to km 163.000 (Marodakhan to Bhartoli) (Tanakpur to Pithoragarh Project Road) of NH-125.
27.18 232.81
22 Reconstruction with geometric improvement of single lane to 2 lane with paved shoulders configuration from existing km 163.00 to km 194.800 (design Chainage 160.88 to km 192.320) of NH- 125 i.
31.44 283.51
23 Slope Stabilization and protection work in km 0.00 to km 72.00 on NH-109 on Rudraprayag -Gaurikund section
0 65.00
24 Widening and Strengthening/ Reconstruction of Existing 2-Lane To 2 Lane with Paved Shoulder Configuration from existing km 338+100 (Design km 333.400) to km 368+000 (Design km 360.579) excluding existing km 349+800 to km. 355+495 (Kaliyasaur Bypass) of NH-58
22.7 136.43
25 Stabilization of landslide at Hatipahar including construction & upgradation of existing road to 2-lane with paved shoulder from existing chainage Km 489.350 to Km 491.600 (Design chainage Km 471.400 to km 473.675) (Shingdhar Bridge to Vishnuprayag Bridge) of NH-07, (Old NH-58)
2.275 130.68
26 Rehabilitation and upgradation of from km. 368.000 - km. 399.000 Rudraprayag - Karnprayag on NH 58
29.125 274.31
27 Rehabilitation and upgradation of from km. 399.00- km. 430.000 Karanprayag-Chamoli on NH 58
28.800 403.36
28 Rehabilitation and upgradation of from km. 430.000 - 467.00 Chamoli-Helang on NH 58
36.675 417.24
29 Rehabilitation and upgradation of Rishikesh-Dharasu road (NH-94) with 2-lane with paved shoulders from design chainage km. 58.603 to km. 58.853 (existing Chainage km. 59.420 to km. 59.650), from Design Chainage km. 61.630 to km. 63.950 (existing chainage km. 62.630 to km. 65.000) and new construction of 2-lane with paved shoulders Chamba Bypass of design length 2.035 km. including 440m long tunnel
4.605 107.07
30 Rehabiliation and upgradation of road Rishikesh-Dharasu (NH-94) with 2-lane with paved shoulders from km. 76.00 to km. 110.00 (Design chainage from km. 74.733 to km. 107.347 including constrcution of Kamand re-alignment from existing Chainage km. 105.200 to km. 108.600 (design chaiange km. 103.436 to km. 105.949 - length 2.513 km) and land slide treatment work between design chainage km. 73.800 to km. 74.000 (200 m) on EPC mode under improvement to NH Connecitivity to Chardham
32.614 273.76
14
Status of ongoing projects under Char Dham
Sl. No.
Name of the Project Length (in km)
Sanctioned Amount (Rs. In Cr)
31 Rehabilitation and upgradation to 2 lane with paved shoulder configuration for design Chanage km. 107.347 to km. 129.208 & km. 133.878 to km. 138.570 (existing chainage km. 110.000 to km. 133.020 & km. 137.330 to km. 142.028) excluding Chiniyalisaur bypass and land slide treatment at existing km. 138.500 (Design chainage km. 134.970) on Rishikesh - Dharasu seciton of NH-94 on EPC mode under improvement to NH connectivity to Chardham
26.553 346.50
32 Construciton of two lane road with paved shoulder for Chinyalisour bypass from existing chainage km. 133.020 to km. 137.330 (design chainage km. 0.000 to km. 4.316) of NH-94 (old) under Chardham Pariyojna in State of Uttarakhand
4.316 43.39
33 Widening and strengthening of existing single /2lane to 2 lane with earthen shoulder configuration from Km 101.060 to 110.860 on road Dharasu-Gangotri on NH 108
9.67 59.24
34 Rehabilitation and up-gradation to 2 lane/ 2 lane with paved shoulder from existing km 172.900 to km. 194.150 (Design Chainage km. 49.300 to km. 70.300) on Dharasuto Yamunotri Roadof NH-134 (old NH- 94) in the State of Uttarakhand
21.000 293.68
35 Rehabilation and upgradation to 2 lane with paved shoulder configuraiton from existing k. 195.175 to km. 220.00 (Design Chainage km. 71.300 to km. 95.947) excluding chainage 199.800 to 201.900 (design chainage 76.400 to km. 78.400) on Dharasu to Yamunotri Road NH-134 (old NH-94)
22.647 460.73
36 Radi top tunnel project on NH-94 (km. 25.400 to 51.000) on Dhrasu -Yamunotri section
5.000 1384
37 Construction of 2-lane highway & strengthening of NH-109 on Rudraprayag -Gaurikund section from existing km 68.400 to km. 71.200 (Design ch. From 73.600 to 76.120, total length =2.52 km including 775 m long viaduct, Sonprayag bypass)
1.77 + 1 Bridge
143.782
Total 633 8550
15
Kailash Mansarovar RoadRoad development is underway to connect Uttarakhand to Kailash Mansarovar, which falls in the Pithoragarh-Tanakpur section. Road development is di¬cult on these terrains, where temperatures drop to -25o C in winter. Road construction equipment have been brought in from abroad, to cut through hard mountains in the coldest of areas. This has accelerated the construction process
The 75.54 km Ghatiabagarh-Lipulekh road (G.S. Road with BRO) is a part of the Mansarovar Yatra route. On completion the road will directly connect Kailash to Devbhoomi.
At a glance
Work is in progress from Ghatiabagarh and Air Force maintained detachment at Gunji (45 km) on this road
Connectivity has been achieved up to 62 km towards Lipulekh and up to 29 km towards Ghatiabagarh side
16
Kashipur – Sitarganj Section The 4 laning of Kashipur-Sitarganj section of NH 74, under NHAI, has been provisionally completed in August 2017 on BOT (Toll) mode and is under tolling for 65.745 km. The project is likely to be completed by March 2019.
At a glance
77.20 km total (design) length
Rs. 757.41 Cr total project cost
17
At a glance
52.20 km total (design) length
Rs. 243.11 Cr total project cost
Sitarganj-Tanakpur SectionThe 2 laning of Sitarganj-Tanakpur Section on NH-125 with paved shoulder being executed under NHAI on EPC mode has been provisionally completed in March 2017. The project will be completed by June 2018.
18
Rampur – Kathgodam Section4-laning of Rampur – Kathgodam Stretch of NH-87 is under progress in the following 2 packages:
(i) Rampur – Rudrapur section in Uttar Pradesh
43.446 km total length
Rs. 572.74 Cr total (Bid) cost
The project was awarded on 31st March 2016 on Hybrid Annuity Mode. Appointed date for the project was declared as 31st March 2017. Work is in progress. 11 km is complete as on May, 2018. The project is scheduled for completion by March, 2019.
(ii) Rudrapur Kathgodam in Uttarakhand
The project was awarded on 31st March 2016 on Hybrid Annuity Mode at Bid Project cost 526.26 Cr. The Appointed Date for the project was declared on 28th Oct 2017. Work is in progress. The project is scheduled for completion by October, 2019.
Haridwar Ring Road5 RFPs for DPR preparation for the construction of Haridwar Ring Road have been received on 12th June 2018. The proposals are under evaluation. The tentative length of bypass is about 50 km. The DPR is scheduled to be completed in 10 months. The bidding process for construction of the bypass will start in March, 2019.
19
Sl. No.
Lok sabha constituency
Project Name NH No (New)
Sanctioned Cost/TPC (Cr)
Total Length
Date of Start
Estimate date of completion
1 Almora-Pitthoragarh
Widening/Reconstruction of 4Mtr span culvert (9Nos) from DWARSON-CHAUKUTIYA Section
109 8.73 - May-16 May-18
2 Almora-Pitthoragarh
Widening of road edge to edge in abadi portions on Almora-Ranikhat-Kosi Road (Machaliya-Airon)
109 5.27 - Feb-16 Dec-18
3 Nainital / Udham Singh Nagar
Widening to Two Lane with geometrics improvement Khairna to Kakrighat
109 38.6 10 Aug-16 Dec-18
4 Tehri Garhwal
Construction of Four Lane ROB at Mohkampur Railway Crossing
7 83 1.03 Oct-16 Sep-18
5 Tehri Garhwal
Construction of Four Lane ROB in Ajabpur near Dehradun
7 69 0.815 Dec-16 Nov-18
6 Haridwar Construction of two Lane road Tunnel near Dat ki Devi
307 71.92 0.8 Mar-17 Feb-19
7 Tehri Construction of 21 M span bridge in Paulgaon
134 2 - Oct-15 Dec-18
8 Pauri Garhwal
Mitigation of Lambagarh Landslide
7 108 - Jun-16 Dec-18
9 Yamkeshwar Construction of prestressed box girder bridge at Satpuli
534 14 81.6 Nov-15 Dec-18
10 Tehri Construction of 21 M span RCC girder bridge in Bramkhal
134 2 - Apr-12 Dec-18
11 Tehri Garhwal
Widening of existing two lane to four lane from I.S.B.T. to Ajabpur Railway Crossing
7 20 5 Apr-12 Jun-19
12 Tehri Garhwal
Four laning from Nepali Farm to Geeta Nagar, Rishikesh
34 32 7 Oct-14 Dec-18
13 Narendar Nagar
Treatment of Landslide Hazard Zones of Saknidhar, Devprayag Sinking Zone, Srinagar River Bank Protection on Rishikesh-Rudraprayag Section
7 76 - Oct-16 Dec-18
14 Pauri Garhwal
Construction of two lane with paved shoulders configuration & strengthening of NH-58 from Kaliyasaur re-alignment
7 148 3.7 Jan-18 Jan-20
15 Pauri Garhwal
Widening & Strengthening of existing intermediate/two lane to two lane with paved shoulder configuration including 775 m long viaduct songprayag bypass
107 144 1.7 awarded -
16 Pauri Garhwal
Widening and Strenthening of existing intermediate / two lane to two-lane with paved shoulder configuration including existing 3.470 km of Rudraprayag Bypass
107 141 16.4 Dec-16 Nov-19
17 Almora-Pitthoragarh
Strengthening including road safety works, widening of road edge to egde in selected abadi portion and reconstruction of 40 Nos. of culverts in Ranikhet - Dwarhat-Chaukhutia road
109 27 29 Jun-16 Dec-18
Ongoing Projects of MoRTH in Uttarakhand
20
Sl. No.
Lok sabha constituency
Project Name NH No (New)
Sanctioned Cost/TPC (Cr)
Total Length
Date of Start
Estimate date of completion
18 Pauri Garhwal
Rehabilitation/ Treatment of Landslide Location with Slope Protection and Drainage Improvement at Nandaprayag, Maithana, Birahi & Gulabkothi
7 58 1 Apr-16 Jun-18
19 Pauri Garhwal
Rehabilitation/ Treatment of Landslide Location with Slope Protection and Drainage Improvement at Helang, Govindghat-II and Govindghat-III
7 45 0.5 Apr-16 Jun-18
20 Tehri Garhwal
Strengthening work from Vikasnagar - Barkot Road to Chamba - Mussoorie road
707A 36.62 36 Mar-17 Feb-19
21 Tehri Garhwal
Strengthening work chamba- mussoorie road section
707A 30.51 39 Mar-17 Feb-19
22 Tehri Garhwal
Strengthening work from Paonta - Hatkoti Road to Petri
707 41.4 40.45 Mar-17 Sep-18
23 Devprayag and Srinagar
Reconstruction with geometric improvement of existing two lane/intermediate lane to two lane with paved shoulder configuration Devprayag-Srinagar section
7 257 38 Dec-17 Dec-19
24 Pauri Garhwal
Widening and strengthening of existing single /two lane to two lane with earthen shoulder configuration Fata to Sitapur
107 75.73 10 Nov-17 Nov-19
25 Tehri Garhwal
Reconstruction with geometric improvement of existing intermediate lane to two lane with paved shoulder configuration in Rishikesh-Agrakhal section
34 209 21.9 Sep-17 Dec-18
26 Nainital-Udham Singh Nagar
Strengthening/Raising from Mohan-Marchula section
309 9.84 14 Dec-16 Dec-18
27 Almora-Pitthoragarh
Strengthening from Panar-Gangolihat section
309 A 33 45 Dec-16 Dec-18
28 Almora-Pitthoragarh
Strengthening from Saryu River - Kangar
309A 16 32 Dec-16 Dec-18
29 Narendar Nagar & Devprayag
Reconstruction with geometric improvement of existing two Lane/Intermediate Lane to two lane with paved shoulder from Kaudiyala-Devprayag
7 200.34 32 Dec-17 Dec-19
30 Narendar Nagar
Widening of existing single lane road to two lane with paved shoulder including 600 m marine drive viaduct portion near Byasi in Uttarakhand
7 248 30.8 Dec-17 Dec-19
31 Almora-Pitthoragarh
Reconstruction with geometric improvement of existing two lane /Intermediate lane to two lane with paved shoulder from Tanakpur- Naulapani
9 282 39.73 Jun-17 Jun-19
32 Tehri Garhwal
Strengthening, with DBM/BC from Ponta to Sahaspur
7 13.43 20 Mar-17 Dec-18
Ongoing Projects of MoRTH in Uttarakhand
21
Sl. No.
Lok sabha constituency
Project Name NH No (New)
Sanctioned Cost/TPC (Cr)
Total Length
Date of Start
Estimate date of completion
33 Pauri Garhwal
Construction & Widening work including Augustmuni Bypass to two lane with paved shoulder from Augustmuni to Kund & Guptkashi to Sitapur
107 418.88 32 Feb-18 Feb-20
34 New Tehri Strengthening work from Daizer -Chhol Gaon
707A 22 32 May-17 May-18
35 Nainital / Udham Singh Nagar
Construction of two-Lane ROB and its approaches in lieu of existing level Crossing near tanda tella
734 56.7 - Nov-17 Nov-19
36 Almora-Pitthoragarh
Reconstruction With geometric improvement of existing two lane to two Lane with paved shoulders configuration (Pithoragarh-Tanakpur Project road)
9 233 27.18 Nov-17 Nov-19
37 Almora-Pitthoragarh
Reconstruction With geometric improvement of single Lane to two Lane with paved shoulder configuration churani -maryura
9 284 31.44 Nov-17 Nov-19
38 Almora-Pitthoragarh
Reconstruction with geometric improvement of single/intermediate Lane to two- Lane with paved shoulder configuration from Naula pani - champawat
9 267 28.12 Nov-17 Nov-19
39 Tehri Garhwal
Reconstruction With Geometric Improvment Of Existing Intermediate Lane To Two Lane With Paved Shoulder Configuration Rishikesh - Chamba - Tehri Rd
34 331 31 Feb-18 Jan-20
40 Tehri Widening to two-lane with paved shoulder including major bridge & protection work of Paligaad market on Hill side and valley side
134 33.4 1 Jun-17 Dec-18
41 Tehri Construction of interlocking tile road in Naugaon Market
507 1.31 - May-17 Dec-18
42 Tehri Garhwal
Construction of 30.00 M span RCC motor bridge at Tyuni-Maletha
707A 3.59 0.03 Jan-17 Jul-18
43 Tehri Garhwal
Construction of 15.00 M span RCC motor bridge near kempty
707A 2.36 0.02 Jul-17 Dec-18
44 Tehri Garhwal
Construction of 12.00 M span RCC motor bridge at Tyuni-Maletha
707A 1.82 - Jan-17 Aug-19
45 Nainital / Udham Singh Nagar
Construction of 4-Lane ROB near Ramnagar road
309 76.52 - Dec-17 Dec-19
46 Tehri Strengthening work from Barkot - molnau
707A 13.05 15 Mar-17 Feb-18
47 Tehri Rehabilitation and upgradation to two lane with paved shoulder configuration from Dharasu Bend to Silkyara Bend
134 237.8 24.3 Nov-17 Nov-19
48 Tehri Garhwal
Construction of 15 M span RCC motor bridge near Banjarawala
707A 3.71 0.39 Jan-18 Jan-19
Ongoing Projects of MoRTH in Uttarakhand
22
Sl. No.
Lok sabha constituency
Project Name NH No (New)
Sanctioned Cost/TPC (Cr)
Total Length
Date of Start
Estimate date of completion
49 Nainital / Udham Singh Nagar
Strengthening work of 35 KM near NH division Haldwani
109 45 35 Dec-18 Nov-19
50 Nainital / Udham Singh Nagar
Strengthening work near NH division Haldwani
109 2.85 2 Mar-18 Sep-18
51 Srinagar & Rudrprayg
Widening and Strengthening / Reconstruction of Existing two Lane To two Lane with Paved Shoulder Configuration (Kaliyasaur Bypass)
7 136.43 22.74 Awarded -
52 Almora-Pitthoragarh
Strengthening of 9.32 km in Almora district
87 Ext. 9.32 9.21 Mar-18 Dec-18
53 Pauri Garhwal
Construction of 4 nos bridges in Pauri Garhwal
119 15.3 - Mar-18 Sep-20
Ongoing Projects of MoRTH in Uttarakhand
Sl. No.
Lok Sabha Constituency
Project Stretch NH Project Cost (Rs. Cr)
Length in km
Start date
Estimated date of completion
1 Muza¢arnagar-Haridwar
Muza¢arnagar - Haridwar
58 754 80 Sep-11 Jun-19
2 Haridwar- Dehradun
Haridwar - Dehradun 72,58
478 39 Nov-11 Jun-19 (Balance work under bidding)
3 Haridwar, Saharanpur
Chutmalpur - Ganeshpur and Roorkee - Chutmalpur- Gagalheri
72-A & 73
942 53 Feb-18 Jun-19
4 Saharanpur, Ambala
Gagalgeri - Saharanpur - Yamuna-nagar (UP / Haryana Border)
73 1184 51 Feb-18 Feb-20
5 Haridwar, Nagina
Haridwar - Nagina 74 827 72 Jan-18 Jul-20
6 Nainital- Udham Singh Nagar, Nagina, Rampur
Nagina - Kashipur 74 1156 98.8 Oct-17 Apr-20
7 Nainital- Udham Singh Nagar, Almora
Sitarganj - Tanakpur 125 243.11 52 Sep-15 Mar-19
8 Nainital- Udham Singh Nagar, Rampur, Bareilly
Kashipur-Sitarganj 74 757 77.2 Mar-14 Mar-19
9 Nainital- Udham Singh Nagar
Rampur - Kathgodam (PKG-II) Rudrapur- Kathgodam
87 657 49.78 Oct-17 Oct-19
10 Rampur Rampur - Kathgodam (PKG-I) Rampur- Rudrapur
87 738 43.446 Mar-17 Mar-19
11 Tehri Gharwal Protection work at Nalupani Landslide zone
34 38 0.68 Nov-17 Mar-19
12 Tehri Gharwal Protection work at Bareti landslide zone
34 41 0.8 Apr-18 Mar-20
Ongoing Projects of NHAI in Uttarakhand
23
Sl. No. Stretch Tentative Length (km)
1 Khairna-Ranikhet 28.00
2 Buakhal-Devprayag 49.00
3 Devprayag-Gaja-Khadi 72.00
4 Pandukhal-Nagchulakhal-Ufrekhal-Baijro 92.00
5 Biharigarh-Roshnabad 36.00
6 Laxmanjhula-Dugadda-Nainidanda-Mohan-Ranikhet 273.00
7 Stretch from Moradabad- UP / Uttrakhand border- Jaspur-Kashipur (Total=58km, U.P=53km, Uttarakhand=5km)
5.00
8 Stretch starting from Puranpur in Uttar Pradesh and terminating at Khatima on NH-9 in the State of Uttrakhand. (Length in Uttar Pradesh-39.00 Km, Uttrakhand-16.00 Km)
16.00
9 Pilibhit to Khatima (Length in Uttar Pradesh-23.00, Uttrakhand-15.00) 15.00
10 Kafota-Jakhana-Jong -Tunia-Haripur (29.75 km in HP, 27.25 in Uttarkhand) 27.25
Sub Total 613.25
11 Almora (NH-109) – Kausani–Baijnath–Tharali–Karn Prayag (NH-109 A) 115.00
Sub Total 115.00
Total 728.25
In-Principle declared NH in Uttarakhand
Sl. No.
Lok sabha constituency
Project Name NH No. (New)
Sanctioned Cost/TPC (In Rs. Cr.)
Total length in km
Date of Start
Estimated date of completion
1 Tehri Gharwal
Protection work at Nalupani Landslide
34 38 0.68 Nov-17 Mar-19
2 Tehri Gharwal
Protection work at Bareti landslide zone
34 41 0.8 Apr-18 Mar-20
Ongoing Projects of NHIDCL in Uttarkhand
24
Key Indian National Highways
LEGEND
Golden Quadrilateral
North South Corridor
East West Corridor
MUMBAI
DELHI
KOLKATAPORBANDAR
CHENNAI
SRINAGAR
SILCHAR
Jammu
Jalandhar
GurgaonJaipur
Ajmer
Rajkot
Udaipur
AhmedabadVadodara
Surat
Pune
Satara
BelgaumArabian Sea
Lakshadweep
Indian Ocean
Bay of Bengal
VijayawadaEluruHyderabad
Jhansi
Nagpur
AgraGwalior
Shivpuri
LucknowKanpur
Allahabad
Gorakhpur
Varanasi
Guwahati
PanagarhKharagpur
Bhubaneshwar
Vishakhapatnam
Muzaffarpur
Purnea
Lakhnadon
Barhi
Chilakaluripet
TumkurBangalore
Selam
Madurai
Krishnagiri
HosurRanipet
KANYAKUMARI
COCHIN
25
National Highways - India StoryFast tracking National Highway Development
New National Highways being built86,371.5 km of New and In-Principle National Highways added in 4 years
Building National HighwaysA new Pace of Progress
Yr 2010-2014 Yr 2014-2018
NH LENGTH
91,287 kmNH LENGTH
1,26,350 km
20,353.2 kmTotal
86,371.5 km
New NH
Yr 2010 - 2014 Yr 2014 - 2018
New NH 34,391.5 km
+In principle NH length
51,980 km
26
Construction of roadsRs. 3 lakh Cr worth investments in the road sector in 4 years Significant growth of 158%
Adding more National Highways per dayEnhancing e¬ciency by building 28 km National Highways per day in 4 years, up from 3 km
Yr 2010 - 2014
Yr 2014 - 2018
Rs. 1.16 lakh Cr
19,444 km
Total Cost
Rs. 3 lakh Cr
28,532 km
Total Cost
National Highways - India Story
2010-2011 Rate of Highway construction per day
2012-20132011-2012
2013-2014
2014-2015
2015-2016
2016-2017
2017-2018
2 km
3 km
2 km
3 km
12 km
16.6 km
22.5 km
28 km
27
National Highways - India Story
Road Projects Awarded100% increase in projects awarded with investments of over Rs. 4.68 lakh Cr
Accelerated NH development under Central Road Fund (CRF)Significant increase of 207.6% in cost of CRF works sanctioned for the upgradation & improvement of roads /bridges in the Nation
Yr 2014 - 2018
Yr 2010 - 2014
Rs. 8,613.51 Cr
935
Total Cost
Projects
Yr 2010-2014
Road Length
25,609 kmTotal Cost
Rs 1.62 lakh CrYr 2014-2018
Road Length
51,075.32 kmTotal Cost
Rs. 4.68 lakh Cr
2,876
Rs. 48,186.57 Cr
Projects
Total Cost
28
Transforming India’s Transport Sector Key initiatives in 2014 -2018Over the past four years, various smart initiatives on Indian National Highways have resulted in transparent processes, last mile connectivity, safer roads, upskilling, new opportunities and employment for the people.
Partnering with NGOs to ensure road safety
Exemption from the requirement of commercial licence for LMV and LCV drivers
E-Rickshaws for last mile connectivity
Green buses and electric vehicles have been introduced. Emission standards have been upgraded for vehicles. BS VI norms along with bio fuel B-100, flex-fuel E-85 or E-100 & ethanol ED-95, methanol M-15 or M-100 and methanol MD-95 have been standardised
15% methanol blending can result in the replacement of around 31.9 million tons of crude oil. With crude oil prices at USD 54 per barrel, the use of clean energy biofuels will reduce fuel costs resulting in significant savings. Compared to neat gasoline, M-15 reduces CO and HC emission by 40%. Biofuels will help in reducing vehicle pollution levels in India
Driving training schools in every district for skill development
E Toll - FASTag to enhance e§ciency, and reduce long queues at Toll plazas
Motor Vehicle (Amendment) Bill 2017: To bring transparency, reduce corruption
Road Safety Annual Plan
Greater Compensation for accident victims of upto Rs. 5 lakhs
0.2%-15% decrease in road accidents and fatalities till 2017
29
Indian Bridge Management System (IBMS), the world’s largest inventory of bridges, has been created for proper maintenance of these structures. Till date 1,72,519 bridges of all ages and structures have been inventoried across India,and assigned GPS based Location Numbers, Classification Numbers based on features, Structural Rating & Socio-Economic Rating numbers
Vehicle Fleet modernization programme
Anti Lock Braking System ensuring vehicle and passenger safety
Model Automated Centres for checking fitness of vehicles
789 black spots have been identified and assigned unique ID numbers. Guidelines have been prepared and notified for investigation and rectification of these road accident-prone black spots on National Highways. 265 spots have already been rectified
Rectification measures at 318 spots have been sanctioned and are in various stages of implementation. 139 spots are on State Government roads or with other agencies. Remaining 67 spots would be taken up separately or rectified as part of ongoing projects
Simplified forms for obtaining driving licences
Increasing Speed Limits from 100 km/h to 120 km/h, at par with the global practices
Taxi Policy Guidelines to ensure safe, secure and a©ordable journeys, while reducing congestion as well as pollution in cities
30
ww
w.s
pre
ad.o
oowww.nitingadkari.org
www.facebook.com/nitingadkary
www.twitter.com/nitin_gadkari