Transcript of Project ID - Uttarakhand Disaster Recovery Initiative
UUUTTTTTTAAARRRAAAKKKHHHAAANNNDDD DDDIIISSSAAASSSTTTEEERRR RRREEECCCOOOVVVEEERRRYYY
PPPRRROOOJJJEEECCCTTT (((UUUDDDRRRPPP)))
Project ID: P146653
Government of Uttarakhand
The World Bank assisted
Quarterly Progress Report
July to September 2017
Project Management Unit (PMU)
UDRP-PMU, ITDA Building, IIE (IT PARK),
Sahastradhara Road, Dehradun-248001, Uttarakhand
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun i
TABLE OF CONTENTS
I. PROJECT DETAILS ....................................................................................................... 4
II. EXECUTIVE SUMMARY ............................................................................................. 5
III. CONSOLIDATED PHYSICAL ACHIEVEMENT ........................................................ 7
IV. PROJECT COVERAGE, BENEFITS ........................................................................... 12
V. FINANCIAL PERFORMANCE ................................................................................... 14
VI. COMPONENT – 1: RESILIENT INFRASTRUCTURE RECONSTRUCTION ......... 15
VII. COMPONENT–2: RURAL ROAD CONNECTIVITY ................................................ 24
VIII. COMPONENT–3:TA&CBDRM ................................................................................... 49
IX. IMPLEMENTATION SUPPORT ................................................................................. 52
X. MANAGEMENT INFORMATION SYSTEM (MIS) .................................................. 54
XI. COMPREHENSIVE REPORT ON SAFEGUARD COMPLIANCE ........................... 56
XII. APPENDIX 1: – DETAILS OF SDRF EQUIPMENTS................................................ 61
XIII. APPENDIX 2: – TECHNICAL TASK FORCE TEAM ............................................... 63
XIV. APPENDIX 3: – TEAM FOR VETTING OF REPORTS ............................................ 65
XV. APPENDIX 4: - HIGH POWER COMMITTEE (HPC) MEETINGS .......................... 67
XVI. APPENDIX 5: - SITE PHOTOGRAPHS ...................................................................... 68
ENVIRONMENT BEST PRACTICES – PHOTOGRAPHS .......... Error! Bookmark not defined.
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 2
ABBREVIATIONS
ADB : Asian Development Bank
DEA : Department of Economic Affairs
DM : District Magistrate
DMMC : Disaster Mitigation and Management Unit
DPM : Deputy Program Manager
DRM : Disaster Risk Management
DSC : Design and Supervision Consultancy
DSS : Decision Support System
EA : Executing Agency
EMP : Environmental Management Plan
ESA : Environment and Social Assessment
ESMF : Environment and Social Management Framework
EWS : Early Warning Systems
FM : Financial Management
GoI : Government of India
ODCH : Owner Driven Construction of Houses
ODR : Other Districts Roads
OP : Operational Policy
ORAF : Operational Risk Assessment Framework
PDO : Project Development Objective
PIU : Project Implementation Units
PM : Program Manager
PMMGSY : Pradhan Mantri Gram Sadak Yojana – Rural Roads
Project
PMU : Project Management Unit
PSC : Project Sanctioning Committee
RAP : Resettlement Action Plan
RCC : Reinforced Cement and Concrete
SDMA : State Disaster Management Authority
GoUk : Government of Uttarakhand
IA : Implementing Agency
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 3
IBRD : International Bank for Reconstruction and
Development
IAS : Indian Administrative Service
IDA : International Development Association
IIRS : Indian Institute of Remote Sensing
IIT : Indian Institute of Technology
JRDNA : Joint Rapid Damage and Needs Assessment
M&E : Monitoring and Evaluation
MDR : Major District Roads
MNREGA : Mahatma Gandhi National Rural Employment
Guarantee Act
MIS : Management Information System
NCB : National Competitive Bidding
NDMA : National Disaster Management Authority
NDRF : National Disaster Response Force
NH : National Highways
SCDGS : Social Community Development- Gender
Specialist
SH : State Highways
SUDHA : Society of Uttaranchal Development and
Himalayan Action
TA&CBDRM : Technical Assistance and Capacity Building for
Disaster Risk Management
TSSC : Technical Support and Supervision Consultancy
UDRP : Uttarakhand Disaster Recovery Project
UIDC : Uttarakhand Infrastructure Development
Corporation
UKRWSSP : Uttarakhand Rural Water Supply and Sanitation
Project
USAC : Uttarakhand Satellite Application Centre
WB : World Bank
WIHG : Wadia Institute of Himalayan Geology
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 4
I. PROJECT DETAILS
Basic Details
Project ID : P146653
Project Name : Uttarakhand Disaster Recovery Project
Loan Signing Date : 09.01.2014
Project Implementation End Date : 31.12.2017
Borrower : Government of India
Responsible Agency : Government of Uttarakhand
Contact Person : Utpal Kumar Singh, IAS,
Chief Secretary, GoUk
Program Director, UDRP : Amit Singh Negi, IAS,
Secretary, Finance & Disaster
Management, GoUk
Project Objective : To restore housing, rural connectivity
and build resilience of communities in
Uttarakhand and increase the technical
capacity of the State entities to respond
promptly and effectively to an eligible
crisis or emergency.
Project Finance Data (Expected Disbursement US$ Million)
Total Project Cost (US$ Million) : 250
Total Bank Financing (US$ Million) : 250
Financing Source : International Development Association
(IDA)
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 5
II. EXECUTIVE SUMMARY
The monsoon in June 2013 arrived almost two weeks earlier than expected in Uttarakhand. From
June 15 to 17, 2013, cloud bursts 6 and heavy (64.5 - 124.4 mm) to very heavy (124.5 – 244.4 mm)
rainfall hit several parts of the higher reaches of the Himalayas. This unprecedented rainfall resulted
in a sudden increase in water levels, giving rise to flash floods in the Mandakini, Alakananda,
Bhagirathi and other river basins, also causing extensive landslides at various locations. Continuous
rains caused Chorabari Lake to rise and the Lake’s weak moraine barrier gave way and a huge
volume of water along with large boulders came down the channel to the east, devastating the towns
of Kedarnath, Rambara, Gaurikund and others in its wake. According to official sources, over
900,000 people have been affected by the event in Uttarakhand.
The districts of Bageshwar, Chamoli, Pithoragarh, Rudraprayag and Uttarkashi were most affected.
This region is one of the most important pilgrimage circuits in India. Since disaster coincided with
the peak tourist pilgrimage season, it significantly increased the number of casualties, missing, and
affected population. A total of 580 human lives were lost; over 5,200 people are reported missing7;
4,200 villages were affected; 9,200 cattle/livestock were lost; about 3,320 houses were fully
damaged; about 995 public buildings were damaged; close to 9,000 km of roads were affected; and
85 motor bridges and 140 bridle bridges were damaged. This event also left over 70,000 tourists and
100,000 local inhabitants stranded in the upper reaches of the State.
Landslides and toe erosion by the sediment loaded rivers damaged roads/highways at many
locations and washed away multiple bridges (steel girder, beam, and suspension/cable bridges).
Traffic was disrupted along all national highways and link roads in the region, along with the
disruption of telecommunication lines, all adding to the impact of the disaster. Many hotels, rest
houses and shops around the temple in Kedarnath were completely destroyed.
The World Bank (the Bank) and the Asian Development Bank (ADB), upon receiving a request
from the Department of Economic Affairs (DEA), GoI, fielded a Joint Rapid Damage and Needs
Assessment (JRDNA) Mission that visited the State from July 29 to August 07, 2013. In
collaboration with the Government of Uttarakhand (GoUk), the JRDNA Mission undertook a multi-
sectoral assessment of the damages and laid the groundwork for an immediate recovery and
reconstruction needs framework. The assessment relied upon the damage and loss assessment
carried out by the State government.
The unprecedented event has severely impacted all the communities that are scattered in the
mountainous terrain. The report estimated the cost of damage reconstruction to be about US$661
million. Based on the findings of the JRDNA, the DEA, GoUk, ADB and the Bank agreed on a
framework for assistance in the disaster recovery and future risk reduction.
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 6
Implementation Support:
This component will support the incremental operating costs of the Project, including the operation
of the Project Management Unit (PMU) and the respective Project Implementation Units (PIUs).
The component will also include the creation of small, temporary field implementation offices with
necessary equipment, furniture, etc. In addition, the component will include consultancies required
for the preparation and supervision of specific activities, trainings, exposure visits and knowledge
exchange programs. An agency will be appointed to provide technical and social support to the
Owner Driven Construction of Houses (ODCH).
High Powered Committee (Approving) & Core Committee (Review & monitoring):
A High Powered Committee was constituted to grant approval for new works and a High powered
review committee was constituted to review the progress of works in all sectors. The continuous
monitoring of the Project and its achievements are being taken up by the Core Committee. The first
HPC was held in November 2013 and a total of 39 HPCs have been conducted since then.
• The Minutes of all HPC meetings are available on the project website:
www.ukdisasterrecovery.in
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 7
III. CONSOLIDATED PHYSICAL ACHIEVEMENT
Setting up of PMU and Staffing
• The Project Management Units & Project Implementation Units have been set-up under
SDMA for this project vide GO number 1060/XVIII-(2)/F/13-15(31)/2013A & 1634/XXX-
1-2013.
Setting up of PIU and Staffing
The Project Implementation Units (PIU) have been set-up for each of the four-project sectoral
programs in UDRP.
• PIU, Roads & Bridges, (R&B), PWD;
• PIU, Resilient Infrastructure Reconstruction (RH&PB) and
• PIU, Technical Assistance and Capacity Building for Disaster Risk Management
(TA&CBRM)
Accomplishments during the Quarter (July to September, 2017)
1. Resilient Housing & Public Buildings: ODCH Component completed.
2. Public Buildings (PB): 16 Packages are being constructed under this component
having 26 buildings in 21 Location including USDMA building, Construction work
started in total 25 buildings under 15 Packages. Total estimated cost of the component is
138.13 Cr. The Consultant for USDMA Building has been appointed and concept design
has been presented by the design Consultant.
2. Roads & Bridges (R&B)
Roads
Construction of 13 number of roads, 55 km length have been completed during this quarter.
A total 136 number of roads, 936 km length have been completed worth INR 413.00 Cr.
Bridges
Contracts have been awarded for the construction of 25 numbers of bridges of 1771 m span
and construction has been started in 25 bridges. Out of which One ACROW Bridge at
Sonprayag, District Rudraprayag, one Bridge at Garhmirpur and three No. Box Culverts in
District Haridwar have been completed and opened for traffic.
Machines
28 numbers of machines of worth INR 6.00 Cr, have been already procured.
3. Technical Assistance & Capacity Building for Disaster Risk Management
(TA&CBDRM)
Risk Assessment, Modeling and Capacity Enhancement of Uttarakhand Space Applications Centre
(USAC):
Tranche 2b reports have been submitted by the consultant on 22 May and revised report was
submitted on 5th Sep. 2017 and the same were forward to the TTF & IIT Roorkee for
technical review. This report is approved by TTF & IIT Roorkee.
During this period consultant have carried out Seismic attenuation modeling, review of
retrofitting cost estimation for all district, hazard modeling and hazard profile.
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 8
Establishment of a Decision Support System (DSS):
Earlier two times the bid process was initiated for Design, Development, and Operation of
Modular Decision Support System for Disaster Risk Management but due to some
administration and Management issues both the bid processes got cancelled.
Now new bid process is started after changing the TOR, now this project will be for total 12
months. This was sent to WB for NOL and after receiving NOL from WB the NIT was
published in Newspaper on 27th
Sept., 2017 and last date of submission of REOI is 27th
Oct.,
2017.
River Morphology Study:
Revised Data Collection and Survey report for Phase- II was submitted on 20th
May 2017 and
this report was sent to TTF members and vetting agency on 23rd
May 2017 for the review.
The comments on this report of TTF and vetting agency were submitted to consultant on19th
June 2017. The consultant had revised this report accordingly and submitted report on 05th
July 2017. This report was approved by the TTF members and Vetting agency.
A meeting held on 11 July 2017 with vetting agency (i.e. IRI) at Roorkee to discuss the
methodology of River Morphological report and modeling of rivers.
The consultant have submitted Draft DPR’s for Devlibagar (excluding social and Env. part)
and Kaleshwar on 13th
September 2017 and the same was forwarded to TTF and Vetting
agency on 21st September 2017.
The consultant have submitted Software Requirement Specification (SRS) for URMIS on 25th
August 2017, and on 23rd
September a presentation was delivered by the consultant on
URMIS.
The consultant have submitted draft River Morphological report of Mandakini River on 8th
September 2017 and this report was forwarded to the TTF and vetting agency on the same
day.
Slope Stabilization Study
Revised DPR’s for all the slopes were submitted by the consultant on 5th August, 2017 and
the same was submitted to Vetting agency (THDC) on 10th August, 2017.
A meeting between consultant and TTF members held on 25 August, 2017 to discuss these
DPRs.
THDC Ltd. submitted their comments on 12 Sept, 2017 and the same were forwarded to
WAPCOS on 14th Sept, 2017.
Strengthening Hydro-meteorological Network and Early Warning Systems (EWS):
Under the project it is planned to install 109 AWS, 26 SFO (combination of Single Stevenson
screen + Optical Rain Gauge +Automatic Weather Station), 28 ARG and 16 SG covering all
13 districts of the state.
Specification of instruments is finalized with the help of India Meteorological Department.
Land to install the instruments is identified with the help of district administration.
MOU has been signed between USDMA and IMD on 27.09.2017 for establishment of
hydromet network within the state.
MOU with ISRO-SAC for modeling of field hydromet data has been approved by ISRO –
SAC.
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 9
Strengthening Emergency Response Capacity:
Procurement of S&R equipments amounting INR 20.39 Cr has been done for SDRF Phase -I
& II.
Demonstrations for all equipments proposed under SDRF Phase-III for 16 packages have
been completed.
The list of the packages to be procured under phase-III of Procurement of Search & Rescue
Equipments have been finalized for an estimated value of INR 24.08 Cr and has been sent to
WB for NOL.
Seismic Vulnerability Assessment and preparation of DPRs of 90 Health Centers:
A Contract was signed on 11th
July 2017for doing SVA and DVA of 90 heath buildings of
Uttarakhand State with DDF.
Kick Off workshop held on 29th
July 2017
Consultant has submitted Inception report on 28th
August 2017 and this report was sent to
TTF members on 31st August 2017.
Works Contracts:
Under Resilient Infrastructure Reconstruction component a total of 2382 beneficiaries were
identified in five disaster affected districts of Uttarakhand i.e. Bageshwar (96 beneficiaries),
Chamoli (529 beneficiaries), Pithoragarh (636 beneficiaries), Rudraprayag (826 beneficiaries) and
Uttarkashi (295 beneficiaries).
Details of Beneficiaries included under ODCH (in numbers) as on date
District Total beneficiaries Beneficiaries
Dropped from
ODCH Scheme
Net Balance Total
beneficiaries
Bageshwar 96 0 96
Chamoli 581 52 529
Pithoragarh 655 19 636
Rudraprayag 860 34 826
Uttarkashi 296 01 295
Total 2488 106 2382
Scope of Work – Construction of damaged public buildings during disaster and few new Building
including USDMA (Uttarakhand State Disaster Mitigation Authority) Building are within the Scope
of work. The Buildings are to be furnished with furnitures & Equipments. The district wise
bifurcations of buildings are as under:-
District Rudraparyag Pauri Bageshwar Chamoli Pithoragarh Dehradun Total
No of Public
Building
13 04 04 03 01 01 26
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 10
Summary of Status of Works : The summary of contracts for different packages under this
component are as under:-
PIU PB
Total Scope Awarded Till date Balance (To be
awarded) Remarks for Balance
Work No. of
Packag
es
Scope
(in Rs
Cr)
No. of
Packages
Scope
(in Rs
Cr)
No. of
Package
s
Scope
(in Rs
Cr)
1 2 3 4 5 6 7 8
Works 17 131.13 15 70.99 2 60.14
1- Retro fitting 1.14 Cr.
2- USDMA 58.00 Cr.
3-other departmental
expenses 1.00Cr.
Goods 4 4.47 0 0 4 4.47
1- Furniture 3.43 Cr.
2- Medical Equipments
0.44 Cr
3- Electronics Items 0.27
Cr
4- Computer & Peripherals
0.33 Cr
Consultancy 4 2.53 3 2.34 1 0.19 1- Retrofitting 0.19 Cr
Total 25 138.13 17 73.33 8 64.80
Under Road and Bridges component, contracts have already been signed for 142 packages (111
for Roads, 22 for Bridge and 03 for supply of machineries) worth Rs. 1071.00 Crore and work have
been started in 111 packages of road works and 22 packages of bridges.
Under Technical Assistance & Capacity Building for Disaster Management (TA&CBDRM)
program Under Phase I, all 11 lots of Rescue and safety equipments worth INR 641.97 lacs have
been procured and handed over to State Disaster Relief Force (SDRF). Under IInd Phase Contracts
(Goods) of INR 958.06 lacs with suppliers were signed and under execution for procuring search
and rescue equipments like power tools, Medical first responders (MFR), Flood Rescue, Tents,
Extreme High Mountains rescue equipments, Avalanche Air Bag, Radio Communication Set etc).
Consultancy Contracts
Under Resilient Infrastructure Reconstruction component 01 NGO firm was procured to assist
in the beneficiary validation, motivation, facilitation of shifting, setting up of bank accounts,
facilitating rentals, etc. under the Owner Driven Construction of Houses (ODCH) subcomponent.
The contract has already completed in July 2016.
01 Design consultancy has been awarded for packages under the Public Building component.
Under Road & Bridge component 06 Design / Supervision consultancies have been awarded i.e
04 Design & Supervision Consultancies (DSCs) for Road & 01 Design & 1 Supervision
Consultancy for Bridges, out of which 01 contract of Design for Bridges 01 Contract of Design and
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 11
Supervision Consultancy (DSC-05) is completed & 1 Contract of Design and Supervision
consultancy (DSC-01) also completed.
Under Technical Assistance & Capacity Building for Disaster Risk Management component
For all the five components under Technical Assistance & Capacity Building for Disaster Risk
Management (PIU-TACBDRM), Technical Task force has been formed. Final Consultancy
Contracts for River Morphology Study, Disaster Risk Assessment, Slope Stabilization Work &
SVA and prepration of DPR of Health Center has been signed with DHI (India) –RITES JV on 05th
December 2015, DHI (Singapore) - AIT-ERN JV on 24th
May 2016, WAPCOS Ltd on 25th
June
2016 and DDF Consultant on 11th
July 2017 respectively. For engaging Technical Consultant for
Decision Support System (DSS) and establishment of Hydro-meteorology Network is under
progress.
Under Project Management Unit (PMU) M/s Parul Goyal & Company have been engaged for
assisting the field units of the PIU – Road & Bridge in accounting of UDRP project in tally
software. M/s Ansul Agarwal & Co. was engaged to conduct Internal Audit of the project for FY
2013-2014, FY 2014-2015 FY 2015-16 & FY 2016-17. M/s Samaj Vikas Development Support
Organisation have been engaged as an Independent Environment and Social Auditor.
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 12
IV. PROJECT COVERAGE, BENEFITS
The Primary beneficiaries from the project activities are the local communities in the State. The
main benefits of the project:
Resilient Housing: Multi hazard resilient houses and up-gradation of public buildings are relevant
for the beneficiary households, as they would not only minimize future infrastructural damage
costs, but also improve vulnerable households’ ability to secure their belongings during future
disasters.
Public Buildings (PB): The Primary beneficiaries from the project activities are the local
communities in the State. The proposed Public Buildings are multi hazard resilient Structure,
having all comprehensive facilities to run a Public utility buildings like schools, offices, hostel,
police chowki, foodgodown, health Center, Hostel Community Center, Anganbadi and USDMA
building.
Achievement as on 30
th September 2017
Component Total Scope
(nos.)
Cumulative Target
Value (nos.) in Year
2017*
Target
achieved
till date
No. of public buildings
reconstructed/constructed 26 18 9
Rural Road Connectivity: The benefit of investments to restore rural road connectivity (roads and
bridges) is likely to cover both the State of Uttarakhand, including households and businesses, and
the neighboring States if between-State trade is a significant part of the local economy. Till 30th
September, 2017 works have been started in 215 village roads/other district roads out of that 136
roads are completed benefitting approximately 273,543 people of 477 villages.
As on 30th
September 2017
Component
Total
Target
(Kms)*
Total
Scope
(Kms)
Cumulative
Target Value
(Kms) in Year
3*
Work
started
(Kms)
Target
achieved (Kms)
in year 3
Village
Roads/ ODR
restored
1440 2548 1617 1494 936
*As per PAD
Technical Assistance and Capacity Building for Disaster Risk Management:
1. Risk Assessment Study: This will provide technical assistance to institutions to plan, set-up
and implement a multi-hazard risk assessment of Uttarakhand. This subcomponent will
include: (i) development of the framework and implementation of multi-hazard risk
assessment models for Uttarakhand; (ii) development of a historic hazard and loss database;
(iii) establishment of a technical advisory group for the multihazard risk assessment; (d)
acquisition and processing of high-resolution satellite data for risk assessment; (iv)
development of training of trainers courses to build sustainable risk assessment capacity; (v)
development of a monitoring and evaluation framework; (vi) development of tools that will
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 13
allow the optimal utilization of risk information and increase the resilience of the
communities and DRM capacity of the state; (vii) capacity enhancement of USAC.
2. Establishment of a Decision Support System (DSS): This will entail setting up a DSS that
will integrate and analyze information from multiple sources in an integrated geo-spatial
system. The system will be designed to display information and provide access in a user-
friendly manner.
3. River Morphology Study: This will support the study of the entire morphology of some
key rivers impacted by the disaster. The study will also analyze and identify critical
protective infrastructure works needed for river bank strengthening.
4. Slope Stabilization Study: This will include learning about slope stabilization from existing
successful techniques, ongoing cutting edge work and research in this sector. It will also
introduce appropriate technology for slope stabilization for Uttarakhand through small
demonstrative works.
5. Strengthening of the Uttarakhand State Disaster Management Authority (USDMA):
This will entail developing the institutional set up of the USDMA, technical enhancement of
the facilities at the DMMC, training programs and regular drills for the emergency
operations center staff and Disaster Management Officers at the District and State levels.
6. Strengthening Hydro-meteorological Network and Early Warning Systems (EWS):
This will review existing hydro-meteorological capabilities at the State and National level,
and will develop and implement a hydro-meteorological modernization plan for
Uttarakhand. This will also review existing EWS, identify gaps and establish a robust, fail
safe EWS in the State including optimum use of strengthened networks and facilities.
7. Strengthening Emergency Response Capacity: This will focus on strengthening the
capacity of the State’s disaster response force, fire services personnel and other immediate
key response agencies in responding adequately to disaster situations through better search
and rescue equipment and enhanced training.
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 14
V. FINANCIAL PERFORMANCE
Component Name
Cost in
(US$
Million)
as per PAD
Expenditure
up to 30th
June, 2017
(US$ Million)
Expenditure in
Quarter July -
September,
2017 (US$
Million)
Cumulative
Expenditure Up
to September,
2017 (US$
Million)
Resilient Infrastructure
Reconstruction 31.00 26.56 0.36 26.91
Rural Road Connectivity 155.00 112.72 4.79 117.51
Technical Assistance and
Capacity Building for
Disaster Risk Management
38.00 4.36 1.11 5.47
Financing Disaster
Response Expenses 12.00 8.57 0.00 8.57
Implementation Support 14.00 6.13 0.49 6.62
Contingency Emergency
Response 0.00 0.00 0.00 0.00
Total 250.00 158.33 6.75 165.08
Currency Conversion rate US$=INR 62 (As per PAD) Source: PIUs and PMU
Note: Internal Audit completed for FY 2013–14, 2014–15, 2015–16 & 2016–17 and CAG Audit for
FY 2013–14, 2014–15 & 2015–16 for UDRP Project, reports received and submitted to Bank.
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 15
VI. COMPONENT – 1: RESILIENT INFRASTRUCTURE RECONSTRUCTION
a. Resilient Housing: Owner Driven Construction of House (ODCH)
Relocated Cluster Housing and Public Building work will be carried out by the Uttarakhand State
Infrastructure Development Corporation (USIDC), Owner Driven Construction of Houses (ODCH)
will be implemented by the PMU through the office of respective District Magistrate (DMs).
The present status of the installments being paid under the Resilient Housing (ODCH) component is
as follows:
Status as on 30th
June, 2017 (Amount Rupees in Lacs)
S. N
o.
Dis
tric
ts
Tota
l N
o.
of
Ben
efic
iari
es
1st I
nst
all
men
t
(Ben
efic
iari
es -
No.)
Am
ou
nt
(@1.5
lacs
)
2n
dIn
stall
men
t
(Ben
efic
iari
es -
No)
Am
ou
nt
(@2.0
lacs
)
3rd
In
stall
men
t
(Ben
efic
iari
es -
No)
Am
ou
nt
(@1.0
lacs
)
4th
In
stall
men
t
(Ben
efic
iari
es-
No)
Am
ou
nt
(@0.5
lacs
)
1 Bageshwar 96 96 144.00 96 192.00 96 96.00 96 48.00
2 Chamoli 581 581 871.50 578 1156.00 558 558.00 529 264.50
3 Pithoragarh 655 655 982.50 652 1304.00 645 645.00 636 318.00
4 Rudraprayag 860 860 1290.00 837 1674.00 837 837.00 826 413.00
5 Uttarkashi 296 296 444.00 296 592.00 295 295.00 295 147.50
Total 2488 2488 3732.00 2459 4918.00 2431 2431.00 2382 1191.00
(Rs. In lacs)
Status of Construction of Resilient Houses of Beneficiaries – Total 2382 house construction
completed by 31st March, 2017.
S.
No. Districts
Site preparation,
material collection
and earth work
started
Plinth
Level
House
with
Roof
Level
Total
casting
Roof
Total
completed
with Toilet
construction
1 Bageshwar 00 00 00 00 96
2 Chamoli 00 00 00 00 529
3 Pithoragarh 00 00 00 00 636
4 Rudraprayag 00 00 00 00 826
5 Uttarkashi 00 00 00 00 295
Total 00 00 00 00 2382
Note: The list of the beneficiaries under ODCH program is available at www.ukdisasterrecovery.in
First installments have been paid to 100% beneficiaries and over 2382 beneficiaries have
constructed their till roof level which included 2382 completed houses.
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 16
Status of retrofitting as on 31st March, 2017
S. No. Districts House in which
disaster resilient
feature available
Houses in which resilient
feature have been ensured
through retrofitting
1 Bageshwar 90 06
2 Chamoli 482 47
3 Pithoragarh 549 87
4 Rudraprayag 701 125
5 Uttarkashi 264 31
Total 2086 296
Insurance of ODCH beneficiaries:
Committee finalized the Insurance for the ODCH beneficiaries on 10 years replacement values. As
per the PAD of UDRP the budget for each house was INR 500 but as per the lowest bidder for the
insurance is INR 973.00. The approval from The World Bank before payment to Insurance
Company, HPC approval has been given. Insurance of 2450 houses has been done and insurance
certificate have been handed over to beneficiaries.
This component has been finalized and Closure Report submitted to the Bank.
b. RESILIENT PUBLIC BUILDINGS: Reconstruction of damaged and new public buildings at
21 locations like, Police Station, School, Educational Institute, Health Centers, FoodGodown,
Aanganbadi, Community centre & USDMA building etc. are being taken in six districts of
Uttarakhand i.e. Rudraprayag, Pithoragarh, Pauri, Bageshwar, Dehradun & Chamoli have been
taken under this component.
This component is supporting the reconstruction of damaged public buildings, such as the Primary
school, Inter colleges, Health Sub center, Police Thana, and technical education institutes. The
Detailed status of the public buildings are as under:
S.
No
.
Sub Project
Name
Pkg.
No
Estimated Cost Projected
Cost of
Project i/c
variation
till date
Contract
Bond
Value
Revised
Cost As
per Latest
variation
Name
of
Contra
ctor
Status
Building
wise
Pkg.
wise
Physica
l
(in %)
Finan
cial
(%)
1 2 3 4 5 6 7 8 9 10 11
A Procuremen
t of Works
1 Primary
School
Gandhari
Dist:
Rudraprayag
01/BC
/PIU/
USID
CL/PB
/2015-
16
82.54
166.54 181.56
177.14
181.56
M/s
Cham
oli
Associ
ates
100 66
2 Primary
School
Chopta, Dist:
Rudraprayag
84.00
3 Primary
School Barsu
Dist:
Rudrapryag
Dist:
Rudraprayag
02/BC
/PIU/
USID
CL/
PB/
2015-
68.00
135.95 136.33
133.83
136.33
M/s
Girish
Chand
ra
Nautiy
al
100 73
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 17
4 Primary
School
Kottalla Dist:
Rudrapryag
16 67.95
5 Primary
School Timili
Badma, Dist:
Rudraprayag
03/BC
/PIU/
USID
CL/
PB/20
15-16
71.67
128.34
135.43 125.22
135.43
M/s
Girish
Chand
ra
Nautiy
al
100 66
6 Primary
School
Panjana,
Dist:
Rudraprayag
56.67
7 Primary
School
Kaviltha
Dist:
Rudraprayag
04/BC
/PIU/
USID
CL/
PB/20
15-16
71.00
496.88
79.85
73.27
79.85
M/s
Alok
Infrab
uilders
Pvt.
Ltd
100 74
8 Govt Inter
College
Parkandi,
Dist:
Rudraprayag
425.88
467.20
431.27 467.20
75 74
9 Govt Inter
College
Ghimtoli,
Dist:
Rudraprayag
05/BC
/PIU/
USID
CL/
PB/20
15-16
363.19 363.19
406.79
398.79
406.79
M/s
Cham
oli
Associ
ates
66 64
10 Govt Inter
College
Kotgi, Dist:
Rudraprayag
06/BC
/PIU/
USID
CL/
PB/20
15-16
413.94 413.94 435.80
425.99 435.80
M/s
Surat
singh
&
Sons
100 85
11 Govt Inter
College
Peera
Dhanpur,
Dist:
Rudraprayag
07/BC
/PIU/
USID
CL/
PB/20
15-16
397.24 397.24 454.49
486.86 454.49
M/s
Surat
singh
&
Sons
55 48
12 Food
Godown,
Srinagar,
Dist: Pauri
08/BC
/PIU/
USID
CL/
PB/20
15-16
244.51 244.51 354.88
258.62 354.88
M/s
Purnan
and
Vyas
64 49
(a) Old Site
Location
100 93
(b) New Site
Location
28 12
13 Ladies Police
Station, Fire
office, & CO
Office,
Srinagar,
Dist: Pauri (3
Buildings)
09/BC
/PIU/
USID
CL/
PB/20
15-16
1316.6
9
1316.6
9
1084.21
1084.2
1
1084.21
M/s
Makin
Devel
opers
Pvt.
Ltd.
57 41
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 18
S.
No
.
Sub Project
Name
Pkg.
No
Estimated Cost
Projecte
d Cost
of
Project
i/c
variatio
n till
date
Contra
ct
Bond
Value
Revised
Cost As
per Latest
variation
Name
of
Contra
ctor
Status
Building
wise
Pkg.
wise
Physica
l
(in %)
Fin
anc
ial
(%)
1 2 3 4 5 6 7 8 9 10 11
14 Sub- Center
Baluwakot,
Distt:
Pithoragarh
10/BC
/PIU/
USID
CL/
PB/20
15-16
134.46 134.46 160.90
153.86 160.90
M/s
Manee
sh
Constr
uction
100 100
15 Police
Station
Lambagad,
Distt:
Chamoli
11/BC
/PIU/
USID
CL/
PB/20
15-16
432.44 914.54 1103.24 873.04 1103.24 M/s
Ayush
Constr
uction
pvt.
Ltd.
12
6
16 Police
Station
Govindghat,
Distt:
Chamoli.
482.10
18 State
Allopathic
Dispensary
Pandukeshwa
r, Dist:
Chamoli
14/BC
/PIU/
USID
CL/
PB/20
15-16
516.40 516.40 584.58 523.59 584.58
53 29
19 Fire Station
at Ratura,
Dist:
Rudraprayag
15/BC
/PIU/
USID
CL
/PB/20
15-16
692.05 692.05 620.15 597.4 620.15 M/s
Makin
Devel
opers
Pvt.
Ltd.
55
31
20 Primary
School,
Community
centre,
Aanganwadi
Kendra,
Medical Sub
centre at
Kuwari, Dist:
Bageshwar
16/BC
/PIU/
USID
CL
/PB/20
15-16
386.54 386.54 400.86 400.86 400.86 M/s
M. S
Associ
ates
65 59
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 19
21 USDMA
Building
District
Dehradun
17/BC
/PIU/
USID
CL
/PB/20
15-16
5800 5800 5800 0 0
22 Retro fitting
in public
building
114 114 114
Total Estimated Cost
(Rs in lacs) Sub Total
(A 1)
12221.27
12221.2
7
12975.83 6143.95 7061.83
Other departmental
Expenses(A2)
137.13 137.1
3
137.13 37.13
Total(A) 12358.4 12358
.4
13112.9
6
6143.9
5
7098.96
B Procurement of
Goods
1 Furniture 342.48 342.4
8
342.48
2 Medical Equipments 44.10 44.10 44.10 3 Electronics Items 27.02 27.02 27.02 4 Computer &
Accessories
33.27 33.27 33.27
Sub Total (B) 446.87 446.87 446.87
C Procurement of
Consultancy Services
1 Public Building (Pkg-
2) (41.47+6.22)
47.69 47.69 47.69 30.60 47.69 M/s
Techni
cal
Consul
tancy
Servic
es
2 Public Building (Pkg-
3) (23.29+3.38)
26.67 26.67 26.67 19.38 26.67 M/s
Techni
cal
Consul
tancy
Servic
es
3 Public Building Retro
Fitting
19.01 19.01 19.01
4 USDMA Building 194.50 194.50 159.48 159.48 159.48 M/s
DDF
Consul
tant
Sub Total (C) 287.87 287.87 252.85 209.46 233.84 Grand Total
(A+B+C)
13093.14 13093.
14
13812.6
8
6353.4
1
7332.80
Geological investigations completed for all sites.
Social and Environmental screening completed.
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 20
Monitoring Mechanism of Public Building:
Supervision and monitoring of Public Buildings are being done through the trained
technical staff from the Uttarakhand State Infrastructure Development Corporation
Ltd (USIDCL), now new name is Bridge, Rope way and other Infrastructure
Development Corporation of Uttarakhand Ltd. (BRIDCUL). A Govt of Uttarakhand
undertaking. All the 16 packages (25 buildings) which are under construction, have
been divided in 4 Sub unit for easy monitoring. Each Sub unit is headed by an
Engineer (Equivalent to Assistant Engineer/Resident Engineer). There are total 10
Junior Engineer (Civil) and 2 Junior Engineer (Electrical), who have been appointed
to supervise the project under the four Resident Engineers. Apart from this,
Contractor’s Staff/Engineers are also appointed for all the sites to supervise the
project as per contract agreement. Junior Engineers from USIDCL/BRIDCUL are
closely monitoring the work on site and also take joint measurements along with
Contractor’s representative. Junior Engineer from USIDCL/BRIDCUL has been
assigned with the duty to take accurate measurements (100%) in measurement book
and concerned Resident Engineer (AE) is required to counter check the
measurement as per departmental policy (i.e. minimum 50% Test check).
All materials that are being used at site are also checked by the Field Engineer
beforehand. All necessary tests are being conducted at field laboratories and also at
other laboratories i.e. NABL/PWD etc, if required.
The bill submitted by the contractors is also checked by the Field Engineers
with respect to measurements taken/recorded in the measurement book.
After recommendation for payment by the Field Engineers to the contractor’s
bill, the abstract of cost made by Field Engineers along with measurement book is
counter checked at PIU-PB (HQ) level by the trained Technical staff and Accounts
staff. After due checking and due correction at Head Quarter level as per contract
agreement the contractor’s payment is recommended for payment to further senior
level of DPM, FC and PM. Hence all necessary measures are being taken for quality
control at field level by USIDCL/BRIDCUL staff. The quality of construction has
also been checked by the design consultant at time to time.
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 21
The monitoring of Public Buildings is being done by USIDCL/BRIDCUL
field subunit in following manners.
Field Subunit
AE/RE-1 Er. Anil Kumar
JE(Civil)-1 Er. Rahul Bhatt
Package-1: Primary School
Gandhari & Chopta,
Package-7:GIC Peeradhanpur
JE(Civil)-2 Er. Satyendra Saklani
Package-2: Barsu & Kottalla
Package-6:GIC Kotgi
Package-5:GIC Ghimtoli
AE/RE-2 Er. Vajid Ali
JE(Civil) 4 Er. Mukesh Bisht
Package-4: PS Kaviltha & GIC
Parkandi Rudraprayag
JE(Civil) 5 Er. Himanshu
Sharma
Package-15: Fire Station
Ratura, Rudraprayag
JE(Civil) 6 Er. Rakesh Rawat
Package-11: Police Station
Lambagad & Govindghat
JE(Civil) 3 Er. Atul Juyal
Package-3: Primary School Timli
Badma & Panjana Rudraprayag
Package-13: 60 Seater PG College
Agastmuni Rudraprayag
JE(E/M)-1 Er. Chandrakant Badoni
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 22
Field Subunit
AE/RE-3 Er. Naresh Kumar
JE(Civil) 10 Er. Sukhvir Singh Chauhan
Package-8: Food Godown Srinagar
JE(Civil) 10 Er. Mahendra Prasad Maithani
Package9: Ladies Police Station Srinagar
JE(Civil) 7 Er. Neeraj Kumar
Package 14: SAD Pandukeshwar
JE(Civil) 8 Er. Bhuwan Chandra
Package-16: Primary school, ANM Center,
Anganwadi Kendra, and Community
center.
Package -10: Sub center Baluwakot
JE(Civil) 9 Er. Mahendra Prasad Maithani
Package-8: Food Godown Srinagar
AE/RE-4 Er. Manjeet Deshwal
Estimated cost of project:
Rs 1455.95 Lac
JE(E/M)-2 Er. Praveen Negi
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 23
DESIGN CONSULTANCY DETAILS (Resilient Public Buildings): Two
Only design work is under the scope of the consultancy firm. Supervision will be done by USIDCL
staff.
Details of Consultancy Firm under PIU Public Building:
S.No. Particulars
Bond Cost
(Rs. in
Lakh.)
Contractor Name Category /
Name Scope of Work
1 02/DC/PIU/
USIDCL/PB/201
4 (Package-2)
41.46706 M/s Technical
Consultancy
Services, GMS
Road, Dehradun,
Uttarakhand
Design
Consultancy Providing
Earthquake
resilient Design
for public
buildings. 18
Design have
been finalized
and rest is in
progress.
2. 01/DC/PIU/
USIDCL/PB/201
4 (Package – 3)
23.29038 M/s Technical
Consultancy
Services, GMS
Road, Dehradun,
Uttarakhand
Design
Consultancy
Approach of Design Consultants :
Design consultant has been appointed mainly for the design phase of the project. However the
involvement of the consultant is required upto completion of the project, as several amendments in
drawings and design need to be done during construction stage because of Hill site constraints. The
stage wise site visits are also in the scope of design consultant to check the work which should be as
per their design, drawings and specification. Till date the work done by the consultant is as per
contract agreement and found satisfactory.
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 24
VII. COMPONENT–2: RURAL ROAD CONNECTIVITY
The objective of this component is to restore the connectivity lost due to the disaster through
the reconstruction of damaged roads and bridges including: village roads, Other District
Roads. The roads and bridges are being designed to withstand earthquake and flood forces as
per the latest official design guidelines. The affected rural areas are being benefitted by the
restored access to the market thereby increasing the economic growth in these areas and
timely access to health and education services. Project Implementation Unit (Roads and
Bridges) is being executed by the Public Works Department (PWD).
ROADS: Status of Roads under UDRP Projects (30th
September 2017)
Status Package
(nos.)
Roads
(nos.)
Length
(Km)
Cost
(Rs in
lacs)
Total Scope - 379 2548 93700.00
Sanctioned by HPC 130 239 1711 90700.00
Procurement Status
Status Package
(nos.)
Roads
(nos.)
Length
(Km)
Cost
(Rs in
lacs)
Contract Agreement Signed 111 215 1494 74700.00
LOA issued 09 12 123 9400.00
Total 120 227 1617 84100.00
Bid Status
Status Package
(nos.)
Roads
(nos.)
Length
(Km)
Cost
(Rs in lacs)
Financial Bid opened 0 0 0 0
Technical Bid opened 0 0 0 0
Total 0 0 0 0
Bid floated 0 0 0 0
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 25
Details of the Packages in which agreement signed:
Sl.
No.
Contract
Bond No. Contractor Name
Contract
Description
Len
gth
of
Road
(Len
gth
in
Km
/ S
pan
in M
eter
)
Aw
ard
Valu
e (i
n
Lacs
)
Let
ter
of
Acce
pta
nce
(LO
A)
Con
tract
Sig
nin
g
Date
Con
tract
Du
rati
on
Ph
ysi
cal
Pro
gre
ss (
in
%)
1
UDRP/PWD/0
3/39/RD/001
Dated
17/04/2014
M/s R G Buildwell
Engineers Ltd.,
1449/159-A
Durgapuri,
Sahadara, Delhi
Kandai-Kamoldi-
Molkhakhal Motor
Road(km.1 to 21)
20.78
₹ 3
19.1
4
27-0
3-1
4
17-0
4-1
4
15
100.0
0
2
UDRP/PWD/0
3/39/RD/020
Dated
22/04/2014
M/s R G Buildwell
Engineers Ltd.,
1449/159-A
Durgapuri,
Sahadara, Delhi
Nagrasu Dhanpur
DandaKhal Motor
Road
28.00
₹ 1
,129.5
5
15
-04-1
4
22
-04-1
4
15
100.0
0
3
05-
UDRP/PWD/0
3/40/RD/021
Dated
22/05/2014
M/s Vijay Builders
Near Kali Mandir,
Badripur, Jogiwala,
Dehradun- 248001
(Uttarakhand)
Contract No.
9412117446
Guptkashi-Jakhdar
Motor Road
12.95
₹692.4
3
13-0
5-1
4
22-0
5-1
4
15
100.0
0
Guptkashi by pass
&Guptkashi
Hospital Motor
Road
Guptkashi
inspection House
approach.
Ukhimath Internal
Motor Road.
Ukhimath Temple
Motor Road.
Ukhimath I.H.
Approch Road.
Ukhimath -
Mansoona Motor
Road (urban area)
4
UDRP/PWD/0
3/39/RD/043/
2014 Dated
25/11/2014
M/s Sahab Singh
Rawat& Brothers
Belani,
Rudraprayag,
Uttarakhand.
Kotkhal-Jagtoli
Motor Road. 7.00
₹ 458.5
8
14-1
0-1
4
25-1
1-1
4
15
100.0
0
5
UDRP/PWD/0
3/40/RD/028
Dt.
20/02/2015
M/s Sanjay Negi
Contractor Near
T.R.H Kotdwar
Road Pauri, UK.
Nagjagai-Fegu
Motor Road 4.00
₹ 1
81.8
0
22-1
2-1
4
20-0
2-1
5
15
70.0
0
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 26
Sl.
No.
Contract
Bond No. Contractor Name
Contract
Description
Len
gth
of
Road
(Len
gth
in
Km
/ S
pan
in M
eter
)
Aw
ard
Valu
e (i
n
Lacs
)
Let
ter
of
Acce
pta
nce
(LO
A)
Con
tract
Sig
nin
g
Date
Con
tract
Du
rati
on
Ph
ysi
cal
Pro
gre
ss (
in
%)
6
UDRP/PWD/0
3/40/RD/ 029
Dt.01/04/2015
M/s Star
Construction
6/1236, Diwan
Villa, Old Madho
Nagar, Saharanpur
SalyaTulanga
Motor Raod. 11.00
₹ 7
48.0
9
25
-02-1
5
01
-04-1
5
15
45.0
0
Chenagadh Uchola
Motor Road
7
UDRP/PWD/0
3/39/RD/042
Dated
21/04/2015
M/s Crystal
Infrastructure, 2-
C/487 A,
SundarVihar,
Malhpur Road,
Saharanpur-247001
Rudraprayag to
Gandhar Gadidhar
Dasjula Motor
Road
19.50
₹ 4
49.5
5
25-0
2-1
5
21-0
4-1
5
15
80.0
0
8
UDRP/PWD/0
3/40/RD/055
/2015
Dated
01/07/2015
M/s Bhatt
&Thapliyal
Engineering Hotel
Jwalpa Palace
Gulabrai.
Kusumgarh Sursal
Motor Road 9.40
₹ 4
39.7
6
21-0
5-1
5
01-0
7-1
5
15
100.0
0
Kamsal Jagoth
Motor Road
9
UDRP/PWD/0
3/39/RD/059
/2015
Dated
21/07/2015
M/s Tushar
Builders 159,
PragariVihar,
Rishikesh-249201,
Distt. Dehradun
Sirai Chaura
Bhatwari Motor
Road
3.00
₹207.3
8
23-0
6-1
5
21-0
7-1
5
15
100.0
0
10
UDRP/PWD/0
3/40/RD/054
Dated
31/07/2015
M/s Digamber
Singh Gusain, Vill-
Augustmuni P.O
Augustmuni,
Rudraprayag
Chandrapuri Gugli
Motor Road 4.90
₹283.4
2
27.0
4.1
5
31.0
7.1
5
15
100.0
0
Silla Bamangaon
Motor Road
11
UDRP/PWD/0
3/40/RD/056
/2015
Dated
02/09/2015
M/s R.B Group
Developers &
Builders Village
BagaonDwara
Raipur Dehradun
Taala-Saari Motor
Road
6.60
₹ 3
29.8
9
13-0
5-1
5
02-0
9-1
5
15
100.0
0
PathaliPaldwadi
Motor Road
12
UDRP/PWD/0
3/69/RD/ 094
Dated
21/09/2015
M/s Rajendra
Singh Kuldeep
Singh, 15
SaleenEnclave,
Jogiwala
Dehradun.
Raintoli-Dungra
Motor Road
11.25
₹ 6
08.8
3
10-0
7-1
5
21-0
9-1
5
15
100.0
0
Khedakhal-
Navasu-Hariyali
Motor Road
Kandai-Barangana
Motor Road.
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 27
Sl.
No.
Contract
Bond No. Contractor Name
Contract
Description
Len
gth
of
Road
(Len
gth
in
Km
/ S
pan
in M
eter
)
Aw
ard
Valu
e (i
n
Lacs
)
Let
ter
of
Acce
pta
nce
(LO
A)
Con
tract
Sig
nin
g
Date
Con
tract
Du
rati
on
Ph
ysi
cal
Pro
gre
ss (
in
%)
13
UDRP/PWD/0
2/38/RD/009
Dated
26/04/2014
Ram Narayan
Contractor
Mallgodam,
Railway road,
Muzaffarnager
Sonla Kandara
Maikhura Motor
Road
36.00
₹ 1
,233.9
6
15
-04-1
4
26
-04-1
4
15
98.0
0
14
UDRP/PWD/0
2/36/RD/025/
2014 Dated
12/06/2014
M/s Bharat Bhoomi
Builders
Village
Bhattowala, P.O
Gumaniwala
Rishikesh- 249201
Batadhar Dhunar
Ghat Motor Road 20.00
₹919.5
1
19-0
5-1
4
12-0
6-1
4
15
100.0
0
15
UDRP/PWD/0
2/36/RD/026/
2014 Dated
12/06/2014
M/s Bharat Bhoomi
Builders
Vill. Bhattowala,
P.O Gumaniwala
Rishikesh- 249201
Panduwa khal-
Rohilda Motor
Road 30.68
₹847.1
9
19-0
5-1
4
12-0
6-1
4
15
51.3
4
Gairsain-Pajiyana
Motor Road
16
UDRP/PWD/0
2/03/RD/030/
2014
Dated
20/02/2015
M/s Arya
Construction Co.
395/2, Jain Nagar
Khautali
Muzaffarnagar.
Pokhri Harishanker
Motor Road 4.80
₹ 3
10.4
9
05-1
2-1
4
20-0
2-1
5
15
100.0
0
17
UDRP/PWD/0
2/37/RD/082
Dated
04/06/2015
M/s Universal
Associates, Vill&
P.O Gumaniwala
Shyampur
Rishikesh
Narayanbagar-
Kaub Motor Road 6.35
₹ 5
35.9
7
11
-05-1
5
04
-06-1
5
15
99.0
0
18
UDRP/PWD/0
2/36/RD/083
Dated
04/06/2015
M/s Universal
Associates, Vill&
P.O Gumaniwala
Shyampur
Rishikesh
Bagoli Koti Motor
Road. 11.20
₹ 5
50.1
1
27-0
4-1
5
04-0
6-1
5
15
100.0
0
19
UDRP/PWD/0
2/36/RD/089
Dated04/06/20
15
M/s Surat Singh &
Sons, 54
Akashdeep Colony
Chakrata Road,
Dehradun, U.K
Ghat-
BanjbagadTelan
Motor Road.
7.80
₹ 3
85.8
1
22-0
4-1
5
04-0
6-1
5
15
100.0
0
20
UDRP/PWD/0
2/08/RD/080
Dated
05/06/2015
M/s Dream
RealinfraPvt. Ltd.
5, Rochipura
Mazara, Dehradun
Uttarakhand.
Pursari-Palethi-
Sartoli Motor
Road.
1.00
₹ 1
06.0
6
30-0
4-1
5
05-0
6-1
5
15
36.3
0
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 28
Sl.
No.
Contract
Bond No. Contractor Name
Contract
Description
Len
gth
of
Road
(Len
gth
in
Km
/ S
pan
in M
eter
)
Aw
ard
Valu
e (i
n
Lacs
)
Let
ter
of
Acce
pta
nce
(LO
A)
Con
tract
Sig
nin
g
Date
Con
tract
Du
rati
on
Ph
ysi
cal
Pro
gre
ss (
in
%)
21
UDRP/PWD/0
2/36/RD/088
Dated
05/06/2015
M/s Laxman Singh
rawat village Inda,
NakholiTharali,
District Chamoli
Uttarakhand
Sema-Bairon
Motor Road. 10.50
₹ 7
62.5
7
26
-05-1
5
05
-06-1
5
15
100.0
0
22
UDRP/PWD/0
2/03/RD/030b
/2015
Dated
07/07/2015
M/s R.B
Construction 5/1
HaripurKanwaliPar
amVihar Near
Lalpul Dehradun
Nandprayag
Devkhal to Ghursal
Motor Road 3.75
₹ 3
14.2
7
22-0
5-1
5
07-0
7-1
5
15
94.0
0
Hapla Gudam
Motor Road
23
UDRP/PWD/0
2/08/RD/081
Dated
31/07/2015
M/s Raina
Construction,
Kanakpur, P.O
Surjan Nagar, Distt
Moradabad, U.P
Raitoli-Nargoli-
Kamiyar Motor
Road 7.00
₹ 3
15.2
6
09.0
7.1
5
31.0
7.1
5
15
60.0
0
Saloor Dungra
Motor Road
24
UDRP/PWD/0
2/36/RD/106
Dated
06/08/2015
M/s Singla
Constructions Ltd.
SCO 22-23, First
Floor, Sector 28C,
Chandigarh
Agarchatti-Jingaud
Motor Road. 12.50
₹ 1
,032.0
7
22.0
7.1
5
06.0
8.1
5
15
98.5
8
SarkotSampark
Motor Road
25
UDRP/PWD/0
2/36/RD/096
Dated
03/09/2015
M/s Hindustan
Consruction New
Adarsh Colony,
Civil Line Budaun,
U.P
Semiband to Sivai
Motor Road
9.27
₹ 3
88.0
2
05
-08-1
5
03
-09-1
5
15
100.0
0
Sarmaula Motor
Road
Nagthat Link
Motor Road
26
UDRP/PWD/0
2/36/RD/097
Dated
11/09/2015
M/s Sansun
Contractors Pvt.
Ltd C-2/14A, Raju
Park, Khanpur
New Delhi-110062
Lolti-Kasbinagar
Motor Road
13.12
₹ 7
45.4
4
26-0
8-1
5
11-0
9-1
5
15
100.0
0
Lolti- Malbajwab
Motor Road
Tharali-Junidhar
Motor Road
27
UDRP/PWD/0
1/34/RD/003/
2014 Dated
11/07/2014
M/s Ram Krishnan
Jayara
Word No.- 5, New
Market
Barkot, Distt.
Uttarkashi- UK
Diyari setwade
motor road
18.50
₹ 1
36.5
4
06-0
6-1
4
11/0
7/1
4
15
100.0
0
Garh Ambedkar
motor road
Naugoan Suri
Motor road
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 29
Sl.
No.
Contract
Bond No. Contractor Name
Contract
Description
Len
gth
of
Road
(Len
gth
in
Km
/ S
pan
in M
eter
)
Aw
ard
Valu
e (i
n
Lacs
)
Let
ter
of
Acce
pta
nce
(LO
A)
Con
tract
Sig
nin
g
Date
Con
tract
Du
rati
on
Ph
ysi
cal
Pro
gre
ss (
in
%)
GhanraliPul to
sarbadiyar motor
road
28
UDRP/PWD/0
1/32/RD/008/
2014
Dated
20/02/2015
M/s Bharat
Construction PPCL
Colony, Haridwar
Bypass, Dehradun.
Chinyalisaur-
Jogath Motor Road 20.00
₹1,2
75.4
6
29-1
1-1
4
20-0
2-1
5
15
79.7
8
29
44-
UDRP/PWD/0
1/30/RD/031
Dated
24/03/2015
M/s Kailash
Hilways
Engineering
Associates Kailash
Gate, Muni kiReti,
Distt.
TehriGarhwal
New-Gaon-Sari
Shrikakhal Motor
Road
10.00
₹ 5
44.9
5
18-0
2-1
5
24-0
3-1
5
15
98.0
1
30
UDRP/PWD/0
1/30/RD/002
Dated
03/06/2015
M/s Vinod Kumar
Chauhan
Contractor Vill.
Nanoor Khrea, P.O
Tapovan, Raipur,
Dehradun U.K
Badethi Kawa
Motor Road
20.82
₹ 1
83.9
4
13.0
4.1
5
03.0
6.1
5
15
100.0
0
Dunda-Kurah
Motor Road
From Gangorri
N.H to ITBP Motor
Road
Nakuri-Singote
Motor Road
Newgaon Sari-
Srikakhal Motor
Road
31
UDRP/PWD/1
0/30/RD/032
Dated
03/06/2015
M/s Dilawar Singh
Contractor 89-C,
Palm City Dehra
Khas Dehradun
248001
Ranari to
DandaMajaf Motor
Road 5.35
₹ 3
87.1
8
04.0
4.1
5
03.0
6.1
5
15
100.0
0
DundaKurah Motor
Road
32
UDRP/PWD/0
1/31/RD/033
Dated
04/06/2015
M/s Arya
Construction
Company 395/2,
Jain Nagar
Khautali
Muzaffarnagar.
Saura to sauri
Motor Road
6.75
₹ 3
00.9
5
27.0
2.1
5
04.0
6.1
5
15
100.0
0
BhukhiKunjan
Tihar Motor Road
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 30
Sl.
No.
Contract
Bond No. Contractor Name
Contract
Description
Len
gth
of
Road
(Len
gth
in
Km
/ S
pan
in M
eter
)
Aw
ard
Valu
e (i
n
Lacs
)
Let
ter
of
Acce
pta
nce
(LO
A)
Con
tract
Sig
nin
g
Date
Con
tract
Du
rati
on
Ph
ysi
cal
Pro
gre
ss (
in
%)
33
UDRP/PWD/0
1/31/RD/072
Dated
04/06/2015
M/s Seema
Construction
Company R-2/22,
Raj Nagar
Ghaziabad.
Gagnani to
Bhangali Motor
Road
4.60
₹429.4
7
13.0
4.1
5
04.0
6.1
5
15
100.0
0
34
UDRP/PWD/0
1/34/RD/075
Dated
04/06/2015
M/s People
Concern Towards
Society Realities
Court Road Purola.
Garh-Deval-
Molghat Motor
road
3.85
₹ 3
00.6
1
12.0
5.1
5
04.0
6.1
5
15
100.0
0
35
UDRP/PWD/
RD/074
Dated
18/06/2015
M/s Devendra
Construction 2-
Dharampur
Haridwar Road,
D.Dun
Bhadrasu-
Ramalgaon Motor
Road
2.77
₹196.3
6
27.0
4.1
5
18.0
6.1
5
15
100.0
0
36
69-
UDRP/PWD/0
1/31/RD/076
Dated
22/06/2015
M/s Ram Krishnan
Jayara
Word No.- 5, New
Market
Barkot, Distt.
Uttarkashi- UK
Paletha-Kansi
Motor Raod 3.00
₹ 2
36.7
6
30.0
4.1
5
22.0
6.1
5
15
100.0
0
37
UDRP/PWD/0
1/30/RD/032a
/2015
Dated
07/07/2015
M/s Bharat
Construction 9,
PPCL Colony
UdayVihar
Haridwar Bypass
Road, Dehradun.
Dhanari to
Pujargaon Motor
Road 6.00
₹ 3
62.5
9
23-0
5-1
5
07-0
7-1
5
15
67.2
6
Pipli to Gawana
Motor Road
38
UDRP/PWD/0
4/46/RD/004
Dated
12/06/2014
M/s Vijay
Engineering
Associates.Tehri
Bypass Road
ChambaTehri
Garhwal
Uttarakhand
Contract No.
9412951773
Bhaldiyana Bend to
Kuner motor road
56.75
₹ 3
70.7
7
03-0
5-1
4
12-0
6-1
4
15
100.0
0
Ghugti Dhunga
Dhamari
Maindkhal Motor
road
IndragoanKatkhet
Motor road
Kamand Jawarna
Motor road
Kamand thouldhar
motor road
Laluri Ghiya
Kotikayrdachalli
Motor road
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 31
Sl.
No.
Contract
Bond No. Contractor Name
Contract
Description
Len
gth
of
Road
(Len
gth
in
Km
/ S
pan
in M
eter
)
Aw
ard
Valu
e (i
n
Lacs
)
Let
ter
of
Acce
pta
nce
(LO
A)
Con
tract
Sig
nin
g
Date
Con
tract
Du
rati
on
Ph
ysi
cal
Pro
gre
ss (
in
%)
Laluri Koti
Mahoron Ki
Manjkhet Motor
road
Maindkhal
Bangiyal Jawarna
Motor road
Maindkhal Gair
Nagun Motor road
Syansupul to
Ratwari
NakotKholi Motor
road
Uniyalgoan
Nagrajadhar Motor
road
39
UDRP/PWD/0
4/36/RD/039/
2014 Dated
12/06/2014
M/s Pooran
Chandra Ramola &
Brothers,
Baurari, New Tehri
Distt. Tehri
Garhwal
Jakhanidhar-
Garakot-Paurikhal
Motor Road. 34.00
₹ 1
,252.9
8
26-0
5-1
4
12-0
6-1
4
15
100.0
0
Anjanisain-Punanu
Motor Road.
40
UDRP/PWD/0
4/44/RD/19/2
014 Dated
09/09/2014
M/s Shiv Shankar
Construction
Company Village-
Khedli, Post
Bhadrabad Distt.
Haridwar
Uttarakhand
Gaza-Dandachali
Motor Road. 10.00
₹ 4
87.0
3
26/0
7/1
4
09-0
9-1
4
15
100.0
0
41
UDRP/PWD/0
4/49/RD/18/2
014 Dated
03/11/2014
M/s Shiv Shankar
Construction
Company Village-
Khedli, Post
Bhadrabad Distt.
Haridwar
Kempti Fall Bypass
Motor Road. 5.75
₹ 3
03.2
3
15-0
9-1
4
03-1
1-1
4
15
100.0
0
42
UDRP/PWD/0
4/48/RD/017
Dated
27/03/2015
M/s Maa Bhagwati
Const. Co. C-233,
Sector-48, Noida-
201301 Distt. G. B.
Nagar (U.P)
Bhaldiyana Bend to
Kamand motor
road
7.43
₹ 59
4.5
7
31-1
2-1
4
27-0
3-1
5
15
100.0
0
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 32
Sl.
No.
Contract
Bond No. Contractor Name
Contract
Description
Len
gth
of
Road
(Len
gth
in
Km
/ S
pan
in M
eter
)
Aw
ard
Valu
e (i
n
Lacs
)
Let
ter
of
Acce
pta
nce
(LO
A)
Con
tract
Sig
nin
g
Date
Con
tract
Du
rati
on
Ph
ysi
cal
Pro
gre
ss (
in
%)
43
UDRP/PWD/6
/68/RD/007/2
014 Dated
27/05/2014
M/s R G Buildwell
Engineers Ltd.,
1449/159-A
Durgapuri,
Sahadara, Delhi
Chipalghat -
Noutha - Nai
Motor Road
17.00
₹ 290.7
1
19-0
5-1
4
27-0
5-1
4
15
100.0
0
Noudi - Badeth
Motor Road
Paithani - Chuthani
Motor Road
Sakarsain -
Barseela - Bagadh
Motor Road
Syoli - Teela Motor
Road
44
UDRP/PWD/0
6/67/RD/048/
2014 Dt.
25/08/2014
M/s Vijay Builders
Hotel Vijay Palace
Tilwara
Rudraprayag
Satpuli-Marora-
Vyasghat Motor
Road.
24.60
₹ 7
81.3
3
10/0
7/1
4
25/0
8/1
4
15
100.0
0
45
UDRP/PWD/0
6/67/RD/049/
2014 Dt.
27/09/2014
M/s JDA
Construction
Badrinath Marg
(Opp. G.G.I.C)
Kotdwar (Garhwal)
ByasChatti-
Chheitur-Bhutnisi
Motor Road. 15.50
₹ 5
62.8
9
12-0
8-1
4
27-0
9-1
4
15
100.0
0
Birsanikhal-Kota-
Silsu-Bhutnisi
Motor Road.
46
UDRP/PWD/0
6/67/RD/050/
2014 Dated
27/09/2014
M/s JDA
Construction
Badrinath Marg
(Opp. G.G.I.C)
Kotdwar (Garhwal)
Badiyu-Jhakhanoli-
Kunkuli Motor
Road.
10.00
₹ 3
38.9
5
12
-08-1
4
27
-09-1
4
15
100.0
0
47
UDRP/PWD/0
6/71/RD/051/
2014 Dated
31 /01/2015
M/s JDA
Construction
Badrinath Marg
(Opp. G.G.I.C)
Kotdwar (Garhwal)
Kotdwara Pulinda
Motor Road. 12.00
₹ 145.1
8
18-0
9-1
4
31-0
1-1
5
15
100.0
0
48
UDRP/PWD/0
6/70/RD/015
Dated
13/04/2015
M/s JDA
Construction
Badrinath Marg
(Opp. G.G.I.C)
Kotdwar (Garhwal)
Rikhnikhal-
Chanikhal Motor
Road 26.60
₹ 694.9
7
30-0
1-1
5
13-0
4-1
5
15
100.0
0
Bunga-Malla
Motor Road
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 33
Sl.
No.
Contract
Bond No. Contractor Name
Contract
Description
Len
gth
of
Road
(Len
gth
in
Km
/ S
pan
in M
eter
)
Aw
ard
Valu
e (i
n
Lacs
)
Let
ter
of
Acce
pta
nce
(LO
A)
Con
tract
Sig
nin
g
Date
Con
tract
Du
rati
on
Ph
ysi
cal
Pro
gre
ss (
in
%)
Satpuli-Dudharkhal
Motor Road
49
UDRP/PWD/0
6/71/RD/068
Dated
05/06/2015
M/s MNR
Construction
company, 137/100,
Matarani Niwas,
Singhalmandi kargi
Raod Dehradun
Pokhal-Bhawansi-
Mandlu Motor
Road.
19.00
₹ 6
79.9
4
30-0
4-1
5
05.0
6.1
5
15
100.0
0
50
UDRP/PWD/0
6/69/RD/065
Dated
16/06/2015
M/s Divya Jyoti
Construction Co.
20, Ashiana
Apartment,
Kashirampur
Kotdwar Distt.
Pauri
Uflda Dehal-
Chauri Motor Road
12.70
₹ 5
75.6
8
23-0
5-1
5
16.0
6.1
5
15
100.0
0
Arkani Janasu
Khandu Khal
Motor Road
51
UDRP/PWD/0
6/69/RD/066
Dated16/06/20
15
M/s Rajendra
Singh Kuldeep
Singh, D-604,
ALFA Tower
HariDwar Bypass
Road, D.Dun.
Arkani Khandu
Khal Muchyali
Dewal Charakot
Motor Road
17.50 ₹
694.6
2
30-0
4-1
5
16.0
6.1
5
15
100.0
0
52
UDRP/PWD/0
6/71/RD/069
Dated
16/06/2015
M/s Baleinder
Singh & Co. Shop
No. 43-44, Sehaj
Enclave Amritsar-
143001
Nathukhal Pokhari
Khet Motor Road 15.00
₹ 6
45.9
0
30
-04-1
5
16.0
6.1
5
15
68.0
0
Kasyali Khobra
Motor Road
53
84-
UDRP/PWD/0
6/69/RD/066a
Dated
31/07/2015
M/s Bharat Singh
Rawat, Lower
Chopra, Srinagar
Road, Pauri
Garhwal, U.K
Ramkund Ghat to
G.I.C Devprayag
Link Motor Road
0.60
₹ 7
7.9
1
22.0
4.1
5
31.1
7.1
5
15
100.0
0
54
UDRP/PWD/0
6/71/RD/070
Dated
14/08/2015
M/s Jeena
Enterprises
Jeolikote, Nainital,
Uttarakhand
Dadamandi-
Madanpur Motor
Road.
5.00
₹ 2
01.2
0
25.0
6.1
5
14.0
8.1
5
15
100.0
0
55
UDRP/PWD/0
6/71/RD/067
Dated
14/08/2015
M/s Gaurav
Builders
Basundhara Colony
JalalpurKhair
Road, Aligarh
Neelkanth Link
Motor Road
District Pauri
Garhwal
5.00
₹ 3
20.6
5
12.0
5.1
5
14.0
8.1
5
15
100.0
0
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 34
Sl.
No.
Contract
Bond No. Contractor Name
Contract
Description
Len
gth
of
Road
(Len
gth
in
Km
/ S
pan
in M
eter
)
Aw
ard
Valu
e (i
n
Lacs
)
Let
ter
of
Acce
pta
nce
(LO
A)
Con
tract
Sig
nin
g
Date
Con
tract
Du
rati
on
Ph
ysi
cal
Pro
gre
ss (
in
%)
56
UDRP/PWD/0
5/56/RD/040/
2014 Dated
30/06/2014
M/s Dilawar Singh
Contractor 89-C,
Palm City Dehra
Khas Dehradun
248001 Uttarakhan
Submergance
Motor Road 27.50
₹ 5
47.2
2
26-0
6-1
4
30-0
6-1
4
15
100.0
0
Nagthat Bisoi
Motor Road
57
UDRP/PWD/0
5/53/RD/005/
2014 Dated
25/08/2014
M/s Vijay
Engineering
Associates.Tehri
Bypass Road
Chamba Tehri
Garhwal
Uttarakhand
Contract No.
9412951773
Thano Bhogpur
Road.
29.75
₹ 5
43.7
9
10/0
7/1
4
25/0
8/1
4
15
100.0
0
Basantpur Madsi
Road.
Bhogpur Gadul
Fagsi Motor Road.
Dharkot Talai
Motor Road.
Dharkot Tangoli
Baderna Motor
Road.
Harrawala
Nakronda Motor
Road.
Kunwala to Sainik
Colony Motor
Road
Suryadhar Sangaon
M/R
58
UDRP/PWD/0
5/56/RD/041
Dated
06/05/2015
M/s Ajab Singh
Rana & Broders,
28 A Kalidas Road,
Dehradun,
Uttarakhand
Reconstruction of
Ichala Phatao
Magti Motor Road
6.60
₹ 2
96.1
1
04
-04-1
5
06
-05-1
5
15
100.0
0
59
UDRP/PWD/0
5/56/RD/061
Dated
19/06/2015
M/s Gambhir Singh
Vill. Basan P.O
KalsiDistt.
Dehradun
Sahiya Patan
Samlta Panua
Motor Road
11.00
₹ 5
22.2
2
25-0
5-1
5
19-0
6-1
5
15
100.0
0
60
UDRP/PWD/0
5/52/RD/060
Dated
01/07/2015
M/s Raghave Nand
Bijalwan, Vill&
P.O ChillarTiuni
Anu Chillan Motor
Road 5.75
₹ 3
27.5
5
13-0
5-1
5
01-0
7-1
5
15
100.0
0
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 35
Sl.
No.
Contract
Bond No. Contractor Name
Contract
Description
Len
gth
of
Road
(Len
gth
in
Km
/ S
pan
in M
eter
)
Aw
ard
Valu
e (i
n
Lacs
)
Let
ter
of
Acce
pta
nce
(LO
A)
Con
tract
Sig
nin
g
Date
Con
tract
Du
rati
on
Ph
ysi
cal
Pro
gre
ss (
in
%)
61
UDRP/PWD/0
5/56/RD/062
Dated
05/08/2015
Sri Amit Joshi
12 Sadar Bazar,
Chakrata, District
Dehradun.
Koruba-Kwarna
Mangrauli Motor
Road
7.00
₹434.8
9
15
-06-1
5
05
-08-1
5
15
100.0
0
62
UDRP/PWD/1
3/59/RD/006a/
2014 Dated
25/08/2014
M/s Link
Enterprises
Railway Road,
Jwalapur Haridwar
Uttarakhand
Rangharwala to
Nangal M/R
13.50 ₹
220.4
0
26/0
6/1
4
25/0
8/1
4
15
100.0
0
Bhagwanpur-
Sikhrodha Motor
Road.
Dada -Jalalpur to
Samsaan Ghat
Motor Road.
Bhagwanpur-
Imlikhera to
Hakimpur Turra
Motor Road.
G.T Road to Jin
Mohd. Shaeedpur
Motor Road.
G.T Road to Lawa
Road.
G.T Road to
SisonaMarg
Hallumajara Dheer
majara to Changa
Majari Marg.
63
UDRP/PWD/1
3/59/RD/006b
/2014 Dated
25/08/2014
M/s Link
Enterprises
Railway Road,
Jwalapur Haridwar
Uttarakhand
Hasanpur-
Madanpur Motor
Road.
3.46
₹ 2
52.8
7
26/0
6/1
4
25/0
8/1
4
15
100.0
0
Latifpur-
Khubbanpur Road.
Raipur Link Motor
Road.
64
UDRP/PWD/1
3/59/RD/006/
2014 Dated
17/10/2014
M/s Satyam
Infratech 38,
ShivamVihar
Rawali, Mahdood
Makdoompur Link
Road. 5.23
₹ 2
26.9
3
26-0
6-1
4
17-1
0-1
4
15
100.0
0
Rahamatpur to
Belda Road.
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 36
Sl.
No.
Contract
Bond No. Contractor Name
Contract
Description
Len
gth
of
Road
(Len
gth
in
Km
/ S
pan
in M
eter
)
Aw
ard
Valu
e (i
n
Lacs
)
Let
ter
of
Acce
pta
nce
(LO
A)
Con
tract
Sig
nin
g
Date
Con
tract
Du
rati
on
Ph
ysi
cal
Pro
gre
ss (
in
%)
(SIDCUL)
Haridwar, U.K Lahboli to
Mannakheri Road.
Mudlana to
HarjoliJatt Road.
NaglaKoyal Link
Road.
N.H
toNarsanKhurd
Road.
N.H to Ulhera Via
Khedajatt Road.
65
UDRP/PWD/0
9/03/RD/023/
2014 Dated
09/09/2014
M/s Trilok Singh
Ram Singh Jamnal
Kotdwara Road
Lakhan Pur Chowk
Ramnagar
Uttarakhand.
Chamkhala
Querala Dabhra
Motor Road 21.00
₹ 7
50.9
1
27-0
5-1
4
09-0
9-1
4
15
100.0
0
PaisiaPeepna
Motor Road.
66
UDRP/PWD/0
9/03/RD/22/2
014 Dated
09/09/2014
M/s Trilok Singh
Ram Singh Jamnal
Kotdwara Road
LakhanPur Chowk
Ramnagar
Uttarakhand.
Marchula-Sylede-
Deghat Motor
Road.
44.60
₹ 1
,120.5
5
27-0
5-1
4
09-0
9-1
4
15
100.0
0
67
UDRP/PWD/
RD/013a
Dated
18/06/2015
M/s Jagat Singh
Kanwal Khatyari
(Pandhar) P.O
Distt. Almora
Khunt Almora
Motor Road 11.50
₹ 1
24.6
3
23-0
5-1
5
18-0
6-1
5
15
100.0
0
68
79-
UDRP/PWD/0
9/01/RD/
013/2015
Dated
21/07/2015
M/s Balwinder
Singh & Co. Shop
No. 43-44, Sehaj
Enclave Amritsar-
143001
Daura Ratan-Khan
M/R
13.85
₹ 3
71.5
5
01-0
6-1
5
21-0
7-1
5
15
33.4
0
Vishwanath Jaskot
Motor Road
69
UDRP/PWD/0
7/20/RD/12/2
014 Dated
13/08/2014
M/s ESAPN
Infrastructure Ltd.
B-4, Street-7
Shashi Garden
MayurVihar-I,
Delhi- 110091
Ganai Bankot
Motor Road. 13.00
₹ 4
88.6
3
06/0
8/1
4
13/0
8/1
4
15
100.0
0
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 37
Sl.
No.
Contract
Bond No. Contractor Name
Contract
Description
Len
gth
of
Road
(Len
gth
in
Km
/ S
pan
in M
eter
)
Aw
ard
Valu
e (i
n
Lacs
)
Let
ter
of
Acce
pta
nce
(LO
A)
Con
tract
Sig
nin
g
Date
Con
tract
Du
rati
on
Ph
ysi
cal
Pro
gre
ss (
in
%)
70
UDRP/PWD/0
7/16/RD/024
Dt.04/07/2014
M/s Dwarika
Projects B-7 Sector
36, Noida-201303
Didihaat Dunakot
Motor Road
27.56
₹1,0
00.3
0
26-0
6-1
4
04/0
7/1
4
15
100.0
0
Didihaat-
Aadichaura Motor
Road
71
UDRP/PWD/0
7/16/RD/035/
2014 Dated
27/10/2014
M/s Dwarika
Projects B-7 Sector
36, Noida-201303
Kqitee Sain-Rathi
Motor Road.
11.13
₹ 7
82.1
2
27-0
9-1
4
27-1
0-1
4
15
75.9
2
Shishu Mandir-
Nanasen Motor
Road.
Shaid Pushker
Singh Motor Road.
72
UDRP/PWD/0
7/16/RD/034
Dated
21/09/2015
M/s Kunwar
Construction JV
Village & PO
Fultari, Near Plice
Check Galati
Dharchula,
Pithoragarh,
Uttarakhand.
Munsiyari
Dandadhar Motor
Road and Jaiti to
Baniya Gaon
Motor Road
11.00
₹ 4
41.4
0
03-0
9-1
5
21-0
9-1
5
15
62.4
0
73
81-
UDRP/PWD/0
7/15RD/103
Dated
21/07/2015
M/s GDS
Infrastructure
PadamPur Colony
Link Road
Pithoragarh U.K
Madanpur Naini
Motor Road 10.20
₹ 7
64.6
8
27-0
6-1
5
21-0
7-1
5
15
64.0
0
74
90-
UDRP/PWD/0
7/16/RD/101
Dated
26/08/2015
M/s Dalip Singh
Adhikari,
Hathrangiya-
Lohaghat, District
Champawat U.K
Madkot-Baina
Motor Road 24.50
₹ 2,1
08.1
3
09-0
7-1
5
26-0
8-1
5
15
76.0
0
75
UDRP/PWD/0
7/17/RD/036/
2014 Dated
09/12/2014
M/s Chandri Chand
(JV of Pipaliya
Engineering and
Construction) M/s
Chandri Chand,
Siltham Road,
Pithoragarh, U.K
Ogla-Pathakgaon
Narath
Bhagichoura Motor
Road.
12.50
₹ 4
99.1
1
15-1
1-1
4
09-1
2-1
4
15
71.4
2
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 38
Sl.
No.
Contract
Bond No. Contractor Name
Contract
Description
Len
gth
of
Road
(Len
gth
in
Km
/ S
pan
in M
eter
)
Aw
ard
Valu
e (i
n
Lacs
)
Let
ter
of
Acce
pta
nce
(LO
A)
Con
tract
Sig
nin
g
Date
Con
tract
Du
rati
on
Ph
ysi
cal
Pro
gre
ss (
in
%)
76
UDRP/PWD/0
7/16/RD/104
Dated
18/06/2015
M/s A.A Cable
Layers, Shop No.
10, Adarsh Market,
Radha Road, Civil
line, Rampur. U.P
Matiyal Bend
Uparitola Motor
Road
11.78
₹ 1
,052.9
7
05
-06-1
5
18
-06-1
5
15
60.0
0
77
UDRP/PWD/0
7/15/RD/093
Dt.
01/07/2015
M/s M&P
Infrastructure B-
200, Sec-50, Noida
G.B Nagar (U.P)
Ancholi-Jakh
Motor Road 15.00 ₹
668.5
7
22-0
4-1
5
01-0
7-1
52
15
70.2
3
Jakh Meldungri
Motor Road.
78
95-
UDRP/PWD/0
7/17/RD/044
Dated
21/09/2015
Kunwar
Construction JV
Village & PO
Fultari, Near Plice
Check Galati
Dharchula,
Pithoragarh
Baluakote
Paiyyapauri Motor
Road in District
Pithoragarh
9.40
₹ 2
93.7
5
03
-09-1
5
21
-09-1
5
15
50.1
2
79
UDRP/PWD/0
7/15/RD/011/
2014 Dated
15/09/2014
M/s Rajendra
Singh Waldia
Contractor Chilkoti
Bhawan, Bank
Road. Pithoragarh
Acholi Badabe
Motor Road. 9.50
₹ 4
18.2
5
26/0
6/1
4
15/0
9/1
4
15
100.0
0
Badabei Siligiya
Motor Road
80
UDRP/PWD/0
8/05/RD/10/2
014 Dated
15/09/2014
M/s ESAPN
Infrastructure Ltd.
B-4, Street-7
Shashi Garden
Mayur Vihar-I,
Delhi- 110091
Kanda-Saniudiyar-
Rawatsera Motor
Road.
20.00
₹ 1,0
31.5
1
25/0
8/1
4
15/9
/2014
15
100.0
0
81
UDRP/
PWD/08/06/R
D/037/2014
dt 15/09/2014
M/s Dwarika
Projects B-7 Sector
36, Noida-201303
Bhyun-Ghadra
Motor Road.
14.00
₹ 8
29.6
7
25/0
8/1
4
15/9
/2014
15
100.0
0 Bhyun Gulr Motor
Road
Kapkot Tehsil to
Pooling Motor
Road.
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 39
Sl.
No.
Contract
Bond No. Contractor Name
Contract
Description
Len
gth
of
Road
(Len
gth
in
Km
/ S
pan
in M
eter
)
Aw
ard
Valu
e (i
n
Lacs
)
Let
ter
of
Acce
pta
nce
(LO
A)
Con
tract
Sig
nin
g
Date
Con
tract
Du
rati
on
Ph
ysi
cal
Pro
gre
ss (
in
%)
82
26-
UDRP/PWD/0
8/05/RD/038/
2014 Dated
15/09/2014
M/s Dwarika
Projects B-7 Sector
36, Noida-201303
Vijaypur Dhapti-
Basantoli Motor
Road. 11.00
₹ 6
06.4
2
25/0
8/1
4
15/0
9/1
4
15
100.0
0
Kanda-Mantoli
Motor Road.
83
UDRP/PWD/0
8/06/RD/045/
2014 Dated
13/11/2014
M/s ESAPN
Infrastructure Ltd.
B-4, Street-7
Shashi Garden
MayurVihar-I,
Delhi- 110091
Kameridevi-
Syalkot Motor
Road 17.50
₹ 4
16.0
8
28-1
0-1
4
13-1
1-1
4
15
100.0
0
Dhlam Khunoli
Motor Road.
84
UDRP/PWD/
RD/098/2015
Dt.
07/07/2015
M/s Anil Malik
Contractor, H. No.
1214, Sector 23-
Sonepat (Haryana)
Harinagar Klan
Motor road 17.00
₹929.3
1
19-0
6-1
5
07-0
7-1
5
15
100.0
0
85
UDRP/PWD/0
8/05/RD/092
Dated
24/07/2015
Sri Neeraj Mishra
Contractor
Bhagwati
Complex,
Unchapul,
Kaladhungi Road,
Haldwani,
Dayanagar
Kathyatbara Aare
Bypass Motor
Road
5.40
₹ 2
89.8
9
07.0
7.1
5
24.0
7.1
5
15
98.5
2
86
UDRP/PWD/0
8/05/RD/099
Dated
24/09/2015
M/s Anil Malik
Contractor, H. No.
1214, Sector 23-
Sonepat (Haryana)
Chufla-Mate-
Tilsari Motor Road
20.56
₹ 1,5
25.7
5
20-0
8-1
5
24.0
9.1
5
15
97.7
3
Dakghar-Simgadhi-
Motor Road
Okadi-Ana-
Loharchada-
Gairlekh M/R
Kandhar-Reetha-
Talla-Parkoti-
SirkotePatharkhani
87
UDRP/PWD/0
8/06/RD/100
Dated
24/09/2015
M/s Wood Hill
Infrastructure Ltd.
D-42, RDC, Raj
Nagar, Ghaziyabad
Dayuni-Sukanda
Motor Road
19.21
₹ 1,2
24.1
2
08-0
9-1
5
24-0
9-1
5
15
80.3
8
Asse-Bedapakad-
Okhaldhar M/R
Kapkot- Poling
Motor Road
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 40
Sl.
No.
Contract
Bond No. Contractor Name
Contract
Description
Len
gth
of
Road
(Len
gth
in
Km
/ S
pan
in M
eter
)
Aw
ard
Valu
e (i
n
Lacs
)
Let
ter
of
Acce
pta
nce
(LO
A)
Con
tract
Sig
nin
g
Date
Con
tract
Du
rati
on
Ph
ysi
cal
Pro
gre
ss (
in
%)
88
UDRP/PWD/1
0/19/RD/014
Dated
15/05/2014
M/s Panchghati
Constructions
Pangaria Bhawan,
Talli Chanmari,
Lohaghat, Distt,
Champawat
Uttarakhand.
Laluwa Pani
Banlekh Motor
Road
8.40
₹ 3
32.3
1
03-0
5-1
4
15-0
5-1
4
15
100.0
0
89
UDRP/PWD/1
0/19/RD/047/
2014 Dated
13/08/2014
M/s Panchghati
Constructions
Pangaria Bhawan,
TalliChanmari,
Lohaghat, Distt,
Champawat
Uttarakhand
PunaveSiptyNayari
Motor Road. 8.00
₹ 4
63.1
7
17/0
7/1
4
13/0
8/1
4
15
100.0
0
90
UDRP/PWD/1
0/18/RD/046/
2014 Dated
18/12/2014
M/s Parwatiya
Constructions B-7
Bus Station,
Lohaghat
Champawat
Uttarakhand.
Barakot-Simalkhet
Motor Road. 25.00 ₹
7
67.2
3
04-0
9-1
4
18-1
2-1
4
15
100.0
0
91
UDRP/PWD/1
1/12/RD/52/2
014 Dated
13/08/2014
M/s ESAPN
Infrastructure Ltd.
B-4, Street-7
Shashi Garden
MayurVihar-I,
Delhi- 110091
Padam Puri Haida
Khand Kathgodam
Motor Road.
30.00
₹ 1,4
04.4
6
06/0
8/1
4
13/0
8/1
4
15
100.0
0
92
UDRP/PWD/1
0/12/RD/053/
2014 Dated
21/05/2015
M/s Jeena
Enterprises
Jeolikote, Nainital,
Uttarakhand
Talla Ramgarh
Ratighat Motor
Road
8.00
₹ 1
82.5
7
16.0
4.1
5
21.0
5.1
5
15
100.0
0
93 UDRP/PWD/0
2/38/RD/109
M/s Anupam
Construction Co.
Vill. & Post
Bisrakh, G.B
Nagar, U.P
Gauchar-Rano-
Qwithi Motor Road 8.50
₹783.0
49
06-1
0-1
5
20-1
1-1
5
15
70.0
0
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 41
Sl.
No.
Contract
Bond No. Contractor Name
Contract
Description
Len
gth
of
Road
(Len
gth
in
Km
/ S
pan
in M
eter
)
Aw
ard
Valu
e (i
n
Lacs
)
Let
ter
of
Acce
pta
nce
(LO
A)
Con
tract
Sig
nin
g
Date
Con
tract
Du
rati
on
Ph
ysi
cal
Pro
gre
ss (
in
%)
94 UDRP/PWD/0
2/38/RD/108
M/s Sharda
Associates 46/2,
Nehru Marg,
Ashutosh Nagar
Risikesh Distt.
Dehradun
Gauchar-Shail-Dua
Motor Marg 10.00
₹ 6
71.5
3
06-1
0-1
5
02-1
2-1
5
15
96.0
0
95 UDRP/PWD/0
2/08/RD/077
M/s Dream
RealinfraPvt. Ltd.
(J.V) 5 Rachipura
Majhra Dehradun
Jaurasi-Hapla-
Dhotidhar M/R 1.70
₹ 5
56.8
6
23-1
2-1
5
15
25.2
7
Mandal-Anusuiya-
Siroli M/R 0.90
Bamnath-Nail-
Sankari M/R 2.35
Panai-Link M/R 1.00
Kanakcharui-
Pokhta-Ranra
Motor Road
2.22
96 UDRP/PWD/0
4/43/RD/110
M/s Kailash
Hilways
Engineering
Associates Kailash
Gate, Muni kiReti,
Distt. Tehri
Garhwal
Sain-Mandar
Motor Road 15.75
₹ 1
199.7
9
03-1
1-1
5
03-1
2-1
5
15
100.0
0
97 UDRP/PWD/0
4/44/RD/ 111
M/s VAR
Associates, R/O
NahtaurTiraha,
Near SDM Court,
dhampur, U.P
Tachhla-Naur and
Gothal-Kathakholi
Motor Road
9.00
₹ 6
63.0
9
06-1
0-1
5
18-1
2-1
5
15
84.4
6
98
UDRP/PWD/0
6/70/RD/113
Dated
31/10/2015
M/s R B
Contruction, 5/1
Haripur Kanwali,
ParamVihar, Near
LalPul, Derhradun,
Pehargaon Bandoor
Motor Road 6.00
₹ 3
19.9
0
11-0
9-1
5
31-1
0-1
5
15
85.9
0
99
UDRP/PWD/0
6/69RD/016
Dated
31/10/2015
M/s Shiv Sing
Gusain Village
Paniyall Patti,
Sukhron, Tehsil
Kotdwar,
Uttarakhand
Kandah-Bacheli
MR 3.50
₹ 4
22.6
4
03-0
9-1
5
31-1
0-1
5
15
79.0
2
Gangadarshan
Band-to NH58 MR 0.50
Chamrada-Asingi-
Dadini Motor Road 4.25
Deit- Chadhigon
MR 2.50
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 42
Sl.
No.
Contract
Bond No. Contractor Name
Contract
Description
Len
gth
of
Road
(Len
gth
in
Km
/ S
pan
in M
eter
)
Aw
ard
Valu
e (i
n
Lacs
)
Let
ter
of
Acce
pta
nce
(LO
A)
Con
tract
Sig
nin
g
Date
Con
tract
Du
rati
on
Ph
ysi
cal
Pro
gre
ss (
in
%)
100
UDRP/PWD/0
7/20/RD/102
Dated
14/12/2015
M/s Anupam
Construction Co.
Vill. & Post
Bisrakh, G.B
Nagar, U.P
Badari-Kantibora
M/R 6.0
₹ 6
40.8
3
03
-10-1
5
14
-12-1
5
15
59.8
3
101
UDRP/PWD/0
9/01/RD/116
Dated
02/12/2015
M/s Dalip Singh
Adhikari,
Hathrangiya-
Lohaghat, District
Champawat U.K
Mornaula-Jaiti
Motor Road 13.00
₹ 8
89.3
6
24-0
9-1
5
02-1
2-1
5
15
100.0
0
102
UDRP/PWD/0
9/01/RD/115
Dated
03/12/2015
Patni Engineering
& Construction J.V
C 25/1 Judges
Farm, Haldwani
Nainital
Jaiti-PipliWalka
Motor Road 11.67
₹ 1
00-.
49
20-1
1-1
5
03-1
2-1
5
15
98.0
0
103
UDRP/PWD/0
9/03/RD/114
Dated
31/10/2015
M/s Wood Hill
Infrastructure Ltd.
D-42, RDC, Raj
Nagar, Ghaziabad
Chimtakhal-
Bhaunkhal-
Bhatraunjkhal
Motor Road
31.00 ₹ 1
944.2
7
16-1
0-1
5
31-1
0-1
5
15
100.0
0
104
UDRP/PWD/0
2/36/RD/105
Dt.
05/01/2016
N.P Build well Pvt.
Ltd. 102, 1st Floor
Devikachamver
RDC, Rajnagar
Ghaziabad
SunaliDasholikhal
M/R 15.40
₹ 1
036.4
6
14-1
2-1
5
05-0
1-1
6
15
32.0
0 Ujjwwalpur
Sandharkot M/R
Mitiyali Kirasal
2.00
Ujjwwalpur
Sandharkot M/R 2.00
105
UDRP/PWD/0
2/38/RD/107
Dated
05/01/2016
M/s Chaudhary
Sandeep Contractor
& Suppliers, Distt.
Meerut U.P
Kulsari Gariwaram
Motor road 9.00
₹ 5
17.5
1
08-1
1-
15
05-0
1-
16
15
75.0
0
106
UDRP/PWD/0
1/31/RD/073
Dated
03/10/2015
M/s Dinesh Prasad
Dangwal Vill.
Masras, Post Office
Mogi Distt. Tehri
Garhwal, U.K
Barnali-Jhotari
Motor Road 9.05
₹ 6
12.7
7
21
-09-1
5
03
-10-1
5
15
100.0
0
107
UDRP/PWD/0
3/39/RD/095
Dated
03/10/2015
Sri Vinod Kumar
ChauhanVill.
Nanoor Khera
(Behind Panchayat
Jakhdhar-Dewar
Motor Road 3.00
₹ 5
57.1
8
02-0
9-1
5
03-1
0-1
5
15
100.0
0
Bansu-Tiuni Motor
Road 1.50
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 43
Sl.
No.
Contract
Bond No. Contractor Name
Contract
Description
Len
gth
of
Road
(Len
gth
in
Km
/ S
pan
in M
eter
)
Aw
ard
Valu
e (i
n
Lacs
)
Let
ter
of
Acce
pta
nce
(LO
A)
Con
tract
Sig
nin
g
Date
Con
tract
Du
rati
on
Ph
ysi
cal
Pro
gre
ss (
in
%)
Bhawan), Post
Office Tapovan,
Raipur, Dehradun
Khujeer Bend to
ChaukiBadsil
Motor Road
1.00
Suryaprayag-
Mussadung Motor
Road.
5.50
108
UDRP/PWD/0
4/44/RD /112
Dt.
13/10/2015
M/s Ramola
Construction Old
Tehri Road,
Chamba, District
Tehri Garhwal
Dabar-Khal-
Kunda-Mahadev-
Ranichauri Motor
Road
7.00
₹ 3
86.6
0
10-0
9-2
015
13-1
0-1
5
15
100.0
0
109
UDRP/PWD/03
/39/RD/027a
Dated
08/03/2016
M/s shivem
Construction B-18,
Sector-23, Sanjay
Nagar Ghaziabad
Syuni-Raitipata
Motor Road 5.25
₹ 307.8
0
02.0
2.1
6
08.0
3.2
016
15
58.0
0
110
UDRP/PWD/01
/31/RD/071
Dated
20/02/2016
M/s Parth
Constructions 14
Bigha Muni ki
Reti, Tehri
Garhwal
Bhatwari Barsu
Motor Road 2.25
₹ 359.4
0
20.0
1.2
016
20.0
2.2
016
15
56.9
4
ChadethiRaithal
Motor Road 2.03
111
UDRP/PWD/09
/01/RD/025
(new)
Dated
29/02/2016
M/s B.M Const.
Co. Shop No. 5
Bhagwat Market
Main G.T Road.
New PWD Guest
house Badapur
Greater Noida G.B
Nagar.
Batadhar Dhunar
Ghat Motor Road 20.00
₹ 650.8
2
17.0
2.2
016
29.0
2.2
016
15
15.0
0
112 UDRP/PWD/08
/05/RD/091
Dt. 13/01/2016
M/s Parihar
Construction Near
SBI Takula Road,
Bageshwar District
Bageshwar (UK)
Bageshwar
Girichina Motor
Road
13.40
₹ 468.4
1
14.1
0.2
015
13
.01
.20
16
15
100.0
0
113
131-
UDRP/PWD/04
/44/RD/064
Dt. 06/04/2016
M/s O.P Builders,
74/9 Nehru Marg,
Ashutish Nagar,
Rishikesh
Chaka-Paindars
Motor Road 8.85 ₹
411.5
6
29.0
2.2
0
16
06
.04
.20
16
15
91.4
3
114 138/UDRP/PW
D/05/51/RD/11
7
M/s Shivom
Construction,
B-18, Sector-23,
Sanjay Nagar,
Ghaziabad – 201012.
Johri-Jakhan Motor
Road 1.60
₹
61.4
2
30.0
5.2
016
30.0
6.2
016
06
100.0
0
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 44
BRIDGES: Status of Bridges under UDRP Projects (as on 31st December, 2016)
Status Nos. Span
(Meter)
Cost
(Rs in lacs)
Total Scope 60 4201 14800.00
Sanctioned by HPC 25 1809 14800.00
Procurement Status
Status Nos. of
packages
Span
(Meter)
Cost
(Rs in lacs)
Contract Agreement Signed 22 1771 14600.00
LOA issued 00 00 00.00
Total 22 1771 14600.00
Bid Status
Status Package
(nos.)
Bridges
(nos.)
Span
(m)
Cost
(Rs in
lacs)
Financial Bid opened 0 0 0 0
Technical Bid opened 0 0 0 0
Total 0 0 0 0
Bid floated 0 0 0 0
Bridges: Details of the Packages in which agreement signed (22 nos.):
S.
No
Contract Bond
No.
Name of the
Contractor Details of Bridge
Aw
ard
Valu
e
(Rs.
in
lacs
)
LO
A I
ssu
ed
Con
tract
Sig
n
Date
Du
rati
on
(Mon
ths)
Pro
gre
ss (
%)
01 70/UDRP/PWD/0
1/31/BR/04
M/s V.K. Gupta &
Associates, SCO -
263, Sector -14,
Panchkula (Haryana)
Construction of 100m
Span Pedestrian Bridge at
Didsari on Bhagirathi
River ₹633.8
3
06.0
3.1
5
24.0
6.1
5
15
80.0
0
02
71/UDRP/PWD/
BR/01
M/s KGL
Infrastructure 33A,
AamBagh, Gari
Cantt, Dehradun.
Construction of 120 m
spanPedestrain Bridge at
chepro on Pinder River. ₹682.0
2
12.0
5.1
5
01.0
7.1
5
15
38.9
0
03 78/UDRP/PWD/
BR/06
M/s V.K Gupta &
Associates, SCO-
263, Sec-14
Panchkula (HR)
Construction of 140m span
pedestrian Bridge at
AruriPaturi on Alaknanda
River in Distt. Chamoli ₹1021.4
9
25.0
6.1
5
21.0
7.1
5
15
55.0
0
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 45
S.
No
Contract Bond
No.
Name of the
Contractor Details of Bridge
Aw
ard
Valu
e
(Rs.
in
lacs
)
LO
A I
ssu
ed
Con
tract
Sig
n
Date
Du
rati
on
(Mon
ths)
Pro
gre
ss (
%)
04
112/UDRP/PWD/
02/08/BR/15
M/s KGL
Infrastructure 33A,
AamBagh, Gari
Cantt, Dehradun.
Construction of 80 m span
pedestrian suspension
Bridge at Jokhna-Lagga-
Bura in Distt. Chamoli ₹ 6
83.8
3
12.0
5.1
5
23.1
2.1
5
15
40.0
0
05
114/UDRP/PWD/
03/39/BR/05
M/s Kundansingh
Prem Singh Jamnal,
336, Dehradun Road,
Ridhikesh district
Dehradun
Construction of 80 m span
pedestrian suspension
Bridge at Raturaon
Alaknanda River in Distt.
Rudraprayag
₹ 5
45.4
4
23.1
1.1
5
30.1
2.1
5
15
30.0
0
06
UDRP/PWD/AC/
01
M/s Acrow
Corporation of
America
Construction of two lane
70 R Bridge 60m span km.
70 on Sonprayag
Kedarnathroad ₹ 8
08.7
0
13.0
5.1
5
30.0
6.1
5
15
100.0
0
07
123/UDRP/PWD/
03/40/BR/11
M/s Kundan Singh
Rrem Singh Jamnal
336, Dehradun Road
Rishikesh
Construction of 70 m span
Steel Truss Bridge and its
approach roads on
Madhuganga River at
RuchhMahadevKotimahes
hwarmandir
₹490.0
42
22.0
1.2
016
20.0
2.2
016
09
10.0
0
08
127/UDRP/PWD/
03/40/BR/12
M/s KailashHillway
Eng. Asso. C/o
HotalVasundra
Palace, Kailash Gate
Muni Ki Reti,
RishikeshTehri (G)
U.K.
Construction of 45 m span
Steel Truss Bridge and its
approach roads at
TriveniSangam in District
Rudraprayag
₹206.7
1
05.0
2.2
016
04.0
3.2
016
09
50.0
0
09
126/UDRP/PWD/
01/31/BR/08
M/s KailashHillway
Eng. Asso. C/o
HotalVasundra
Palace, Kailash Gate
Muni Ki Reti,
RishikeshTehri (G)
U.K
Construction of 80 m span
Pedestrian Suspension at
Sada on Indrawati River in
District Uttarkashi. ₹518.0
8
04.0
2.2
016
04.0
3.2
016
15 51.0
0
10
128/UDRP/PWD/
01/33/BR/016
M/s Tons Builders
Near Telephone
ExchagePuralaUttark
ashiUttarakhand.
Construction of 60 m span
Steel Truss Bridge in
Block Mori, Vill. Pansranu
to Suriyara over pover
rover in District
Uttarkashi.
₹240.7
2
04.0
2.2
016
08.0
3.2
016
09
96.8
0
11 121/UDRP/PWD/
02/37/BR/07
M/s KGL
Infrastructure 33A,
AamBagh,
GariCantt, Dehradun.
Construction of 100 m
span pedestrian bridge
over pinder river at
boragad ₹810.3
6
11.0
1.2
01
6
20.0
2.2
01
6
15
24.0
0
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 46
S.
No
Contract Bond
No.
Name of the
Contractor Details of Bridge
Aw
ard
Valu
e
(Rs.
in
lacs
)
LO
A I
ssu
ed
Con
tract
Sig
n
Date
Du
rati
on
(Mon
ths)
Pro
gre
ss (
%)
12
122/UDRP/PWD/
03/40/BR/10
M/s Prayag
Construction,
Gairsain District
Chamoli,
Uttarakhand.
Construction of 70 m span
pedestrian Steel Truss
bridge and its approach
roads on madhu Ganga
River at kotma-Chilon in
District Rudraprayag.
₹350.1
6
22.0
1.2
016
20.0
2.2
016
09
46.5
0
13
124/UDRP/PWD/
13/92/BR/26
Anil Mehta House
No. 75, Phase-4,
Mohali Punjab,
Pin 160059
Construction of 30 m span
box culvert bridge and its
approach roads on
Aurangabad Motor Road
at Gadhmirpur in
HaridwarDistric
₹186.0
6
02.0
2.2
016
29.0
2.2
016
03
100.0
0
14
119/UDRP/PWD/
13/55/BR/17
M/s Shiv Shankar
Construction
Company Village
Khedli, Post-
Bahadrabad, District
Haridwar. U.K
Construction of three
number box culvert
bridges at Lakshar On
river Pathari in District
Haridwar
₹667.6
6
05.0
1.2
016
02.0
2.2
016
08
95.0
0
15
130/UDRP/PWD/
02/08/BR/19a
M/s Ram Kumar
Contractor 636/8,
Model Town,
Narwana- 126 116
District Jind
(Haryana)
Construction of 80 m
pedestrian suspension
Bridge at Helam-Urgam-
Kalkeshwar over
Kalpganga River in
Chamoli District.
₹571.4
3
20.0
2.2
016
17.0
3.2
016
15
52.0
0
16 118/UDRP/PWD/
02/37/BR/02
M/s D.S.
Construction 385/65,
Gaushala,
Muzaffarnagar Uttar
Pradesh- 251001
Construction of 90 m span
pedestrian suspension
Bridge at Narayanbagar on
Pinder River in District
Chamoli
₹824.1
9
30.1
2.2
015
02.0
2.2
016
15
74.1
0
17
135/UDRP/PWD/
01/31/BR/03
M/s Border Builers
Moti Mahal Hotel,
Bus Stand,
Uttarkashi.
Construction of 110 m
span Steel Truss Bridge
and its approach roads
over Bhagirathi River at
Naluna in District
Uttarkashi.
₹973.5
3
16.0
5.2
016
15/0
6/2
016
15
37.5
0
18
133/UDRP/PWD/
02/08/BR/19
M/sTriveni
Construction kailash
gate Muni ki Reti,
Rishikesh, Uttarkashi
Construction of 70 m span
steel truss bridge and its
approch road over
Alaknanda River at
Benakuli Village in Distt.
Chamoli
₹377.9
1
16.0
4.2
016
05/0
5/2
016
15
45.0
0
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 47
S.
No
Contract Bond
No.
Name of the
Contractor Details of Bridge
Aw
ard
Valu
e
(Rs.
in
lacs
)
LO
A I
ssu
ed
Con
tract
Sig
n
Date
Du
rati
on
(Mon
ths)
Pro
gre
ss (
%)
19
136/UDRP/PWD/
04/49/BR/09
M/s Triveni
construction
Company Kailash
Gate, muni ki reti,
Tehri Garhwal
Uttarakhand.
Construction of 60 m span
Steel Truss Bridge and its
approach roads on Algad
River at Chamasari in
District New Tehri.
₹433.2
4
27.0
5.2
016
16/0
6/2
016
09
30.0
0
20
132/UDRP/PWD/
07/50/BR/24
M/s Z H Industries
Pvt. Ltd. 32 km.
Dehli Hapur Road,
masoorie Ghaziabad
(U.P.) 201302
Construction of 60 m span
steel truss bridge and its
approach road over
selagarh river at Lithing
Kot in District
Pithoragarh.
₹317.7
0
22.0
3.2
016
29/0
4/2
016
09
37.9
0
21 134/UDRP/PWD/
07/15/BR/25
M/s K.M
Engineering and
Construction, Link
Road Pithoragarh,
Uttarakhand, 262501
Construction of 90 m span
suspension bridge and its
approach road over saryu
river at Nisni in District
Pithoragarh.
₹526.4
7
09.0
5.2
016
19/0
5/2
01
6
15
38.1
5
22
137/UDRP/PWD/
07/50/BR/21
M/s K.M
Engineering and
Construction, Link
Road Pithoragarh,
Uttarakhand, 262501
Construction of 70 m span
steel truss bridge and its
approach road over Dholi
river on Khela Darma at
Bon Gaon in District
Pithoragarh.
₹405.3
7
22.0
3.2
016
28/0
6/2
016
09
32.2
8
MACHINES: Status of Procurement of Machines UDRP Projects (as on 31st December, 2016)
Procurement Status
Item Nos. Cost
(Rs in lacs)
Agreement Signed for supply of machines 03 652.35
Excavator Backhoe Loaders 07 160.21
Supply of Tracked Excavator 10 342.75
Road Rollers 11 149.39
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 48
DESIGN AND SUPERVISION CONSULTANCY/ DESIGN CONSTULTANCY DETAILS
(Road and Bridge): Six (06) DSCs:
Total 06 DSC/DC/SC(B) are engaged by the PIU (Road and Bridge) out of them 04 DSC are for
Roads and rest of 02 DC/SC(B) are for Bridges. Details are as follows: -
S.
No.
Contract
Number Contractor Name
Scope of
work
Date of
Procurement
Contract
Period
Extended
Period as per
EOT
1 UDRP/PWD
/C/ DSC/01
DSC-1: M/s Sheladia
Associate. USA
Design &
Supervision
25.06.2014 20 months 08/03/2017 (Completed)
2. UDRP/PWD
/C/ DSC/02
DSC-2: M/s Egis International
Lane no.-5 Rochiprua,
Niranjanpur, DDn
Design &
Supervision
15.12.2014 19 months 31/12/2017
3. UDRP/PWD
/C/ DSC/04
DSC-4: M/s Yongma
Engineering Co Ltd. 4th
Floor, Tarla Nangal, DDn
Design &
Supervision
11.03.2014 19 months 31/12/2017
4. UDRP/PWD
/C/ DSC/05
DSC-5: M/s Royal Haskoning
House No.4, Vasantkunj-ii
Near Sethi Market, Kanwali
Road, DDn
Design &
Supervision
11.05.2014 21 months 31/07/2017 (Completed)
5. UDRP/PWD
/B/DSC/01
Yooshin Engineering
Corporation DC- Bridge,
Hotel Star
Bridge -
Design
07.11.2014 12 months 31/08/2016 (Completed)
6. UDRP/PWD
/ B/SC/01
DSC-4: M/s Yongma
Engineering Co Ltd. 4th
Floor, Tarla Nangal, D.Dun
Bridge-
Supervision
30.03.2015 16 months 31/12/2017
Source: PIUs
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 49
VIII. COMPONENT–3:
TECHNICAL ASSISTANCE AND CAPACITY BUILDING FOR DISASTER RISK
MANAGEMENT (TA&CBDRM): The objective of this component is to enhance the capabilities of government entities and others in
risk mitigation and response. Technical Assistance and Capacity Building for Disaster Risk
Management will augment government agencies, institutions and others to develop, set-up and
manage risk assessment tools and models, and set up DSS and communication systems in risk
mitigation and response. Staffing of the agency, capacity augmentation, initiating technical work of
risk assessment targeted towards decision making and risk financing will be taken up under the
Project. The GoUk has already initiated the process of operationalising the USDMA.
Status of Technical Consultancies under PIU (TA&CBDRM)
(As on 30th
Sept, 2017)
S.
No.
Name of the
consultancy
Scope of the
Consultancy
Status as on 30th
Sept, 2017
1. Slope
stabilization
and river
training work
at TOE
Minimize rigorous impact
of landslides on
infrastructure and protect
our habitation from large
overflow in rivers during
monsoon by treating and
stabilizing active and
prone slopes with river
training works.
Revised DPR’s for all the slopes were submitted by
the consultant on 5th August, 2017 and the same
was submitted to Vetting agency (THDC) on 10th
August, 2017.
A meeting between consultant and TTF members
held on 25 August, 2017 to discuss these DPRs.
THDC Ltd. submitted their comments on 12 Sept,
2017 and the same were forwarded to WAPCOS on
14th Sept, 2017.
2. Developing
Multi hazard
early warning
system
Modernization of the
State Hydromet
Observation and
Information Systems;
Design and
implementation of the
Uttarakhand State Multi
Hazard Early Warning
System (USMHEWS)
Design and
Implementation of
Decision Support System
(DSS) in respect to
Uttarakhand State Multi
Hazard Early Warning
System (USMHEWS);
Strengthening regulatory
and institutional
framework of
USMHEWS, and
development and
implementation of
training modules to build
capacity and sustain the
operational system.
Under the project it is planned to install 109 AWS,
26 SFO (combination of Single Stevenson screen +
Optical Rain Gauge +Automatic Weather Station),
28 ARG and 16 SG covering all 13 districts of the
state.
Specification of instruments is finalized with the
help of India Meteorological Department. Land to
install the instruments is identified with the help of
district administration.
MOU has been signed between USDMA and IMD
on 27.09.2017 for establishment of hydromet
network within the state.
MOU with ISRO-SAC for modeling of field
hydromet data has been approved by ISRO – SAC.
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 50
3. River
Morphological
Analysis and
Design of
River Training
and Bank
Protection
work in
Uttarakhand
The objective of the
morphological analysis is
to identify vulnerable
areas (habitation, public
or private infrastructure,
agricultural land) where
rivers pose threat from
morphological changes
from episodic events such
as excessive rains, cloud
bursts and large
landslides in the state of
Uttarakhand It is also to
develop Uttarakhand
River Information
Management System
(URIMS).
Revised Data Collection and Survey report for
Phase- II was submitted on 20th
May 2017 and this
report was sent to TTF members and vetting agency
on 23rd
May 2017 for the review. The comments on
this report of TTF and vetting agency were
submitted to consultant on19th June 2017. The
consultant had revised this report accordingly and
submitted report on 05th
July 2017. This report was
approved by the TTF members and Vetting agency.
A meeting held on 11 July 2017 with vetting agency
(i.e. IRI) at Roorkee to discuss the methodology of
River Morphological report and modeling of rivers.
The consultant have submitted Draft DPR’s for
Devlibagar (excluding social and Env. part) and
Kaleshwar on 13th
September 2017 and the same
was forwarded to TTF and Vetting agency on 21st
September 2017.
The consultant have submitted Software
Requirement Specification (SRS) for URMIS on
25th
August 2017, and on 23rd
September a
presentation was delivered by the consultant on
URMIS.
The consultant have submitted draft River
Morphological report of Mandakini River on 8th
September 2017 and this report was forwarded to
the TTF and vetting agency on the same day.
4. Disaster Risk
Assessment of
Uttarakhand
Developing risk
information for
earthquakes, floods,
landslides, flash floods,
and industrial hazards for
the State of Uttarakhand.
Creating a ‘Digital Risk
Database’ for the State of
Uttarakhand which
comprises data and risk
information for
earthquakes, floods,
landslides, flash floods,
and industrial hazards.
Tranche 2b reports have been submitted by the
consultant on 22 May and revised report was
submitted on 5th Sep. 2017 and the same were
forward to the TTF & IIT Roorkee for technical
review. This report is approved by TTF & IIT
Roorkee.
During this period consultant have carried out
Seismic attenuation modeling, review of retrofitting
cost estimation for all district, hazard modeling and
hazard profile.
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 51
5. Design,
Development
and
Deployment
of a Decision
Support
System
The objective of this
effort is to develop and
deliver a scalable
platform that can enables
GoU to effectively
prepare, mitigate,
respond, and recover
from future emergencies
in Uttarakhand.
Earlier two times the bid process was initiated for
Design, Development, and Operation of Modular
Decision Support System for Disaster Risk
Management but due to some administration and
Management issues both the bid processes got
cancelled.
Now new bid process is started after changing the
TOR, now this project will be for total 12 months.
This was sent to WB for NOL and after receiving
NOL from WB the NIT was published in
Newspaper on 27th
Sept., 2017 and last date of
submission of REOI is 27th
Oct., 2017.
The Progress details of procurement of disaster preparedness under TA&CBDRM:
(As on 30st Sept, 2017)
Details Total Achieved Status
SDRF equipments II
phase
(The details enclosed as
(Appendix-1)
10 NCB
5 Shopping
10 NCB
5 Shopping Contract of 10 packages under NCB &
5 packages in Shopping are signed
Automatic Weather
Station (AWS)
04 nos. 04 nos. Established at Chamoli (Gairsain),
Dehradun (Tyuni), Pithoragarh
(Munsyari) & Tehri (Ghansali) districts
of Uttarakhand.
Establishment of Technical
Task Force (Appendix-2)
05 nos. 05 nos. Established through various
Government Orders by GoUk.
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 52
IX. IMPLEMENTATION SUPPORT
This component will support the incremental operating costs of the Project, including the operation
of the Project Management Unit (PMU) and the respective Project Implementation Units (PIUs).
The component will also include the creation of small, temporary field implementation offices with
necessary equipment, furniture, etc. In addition, the component will include consultancies required
for the preparation and supervision of specific activities, trainings, exposure visits and knowledge
exchange programs. An agency will be appointed to provide technical and social support to the
Owner Driven Construction of Houses (ODCH).
Executing Agency at State Level: (As on 30th
September, 2017)
Executing Agency at State-level:
State Disaster Management Authority (SDMA), Government of Uttarakhand (GoUk)
Chief Secretary & Chairman,
HPC (Monitoring & Approval) : Utpal Kumar, IAS
Secretary, Disaster Management
& Member Secretary, HPC : Amit Singh Negi, IAS
Address : Uttarakhand Secretariat, 4 Subhash Road,
Dehradun - 248171, Uttarakhand, India
Project Management Unit
Project Director : Amit Singh Negi, IAS
Secretary, Finance, GoUk
Deputy Program Director : Sanjay Mathur
TFM, ITDA, GoUk
Address :
3rd
Floor, ITDA Building, IIE (IT PARK,
Sahastradhara Road, Dehradun – 248001,
Uttarakhand, India
Telephone : +91-135-2711439
Email : [email protected] /
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 53
Implementation Agency (PIUs):
Program Implementation Unit (R&B), PWD
Program Manager : V Shanmugam, IAS
Address :
3rd
Floor, ITDA Building, IIE (IT PARK,
Sahastradhara Road, Dehradun – 248001,
Uttarakhand, India
Telephone : +91-135-2712112
Mobile No. : +91-9412057727
Email : [email protected] & [email protected]
Program Implementation Unit (Resilient Housing and Public Buildings)
Program Manager :
Vinod Kumar Suman, IAS
Addl. Secretary, Disaster Management Department,
GoUk
Address : Nageshwati Ayurvedi Clininc Complex, Near Rispana
bridge, Dehradun-248001, Uttarakhand, India
Telephone : +91-135-2669971
Mobile No. : +91-7060006575
Email : [email protected] & [email protected]
Program Implementation Unit (Technical Assistance and Capacity Building for Disaster
Risk Management)
Program Manager : Savin Bansal, IAS
Address :
SIIDCUL Building,
29 IIE (IT PARK, Sahastradhara Road,
Dehradun – 248001, Uttarakhand, India
Telephone : +91-135-2744408
Mobile No. : +91-7060006575
Email : [email protected]
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 54
X. MANAGEMENT INFORMATION SYSTEM (MIS)
A MIS has been developed by the project team for monitoring of works and compliance on social
and environmental aspects. The PMU/PIU is strengthening the existing MIS and regularly
improvising it on need basis for the management of the information database, which is an online
tool for gathering updates by the implementing units. This database is also available on the Project
website http://www.ukdisasterrecovery.in as part of regularly sharing information with the public.
The Project Performance Monitoring System is managed by Mr. Manoj Kumar Bisht, Monitoring &
Evaluation Expert (Executive Engineer, PWD), at PIU (R&B), PWD, UDRP.
The following new features have been recently added to the project MIS:-
1. Pictures – Blog System
2. Quality Perception Report
3. Ranking and GAP Report
4. File Tracking System
Pics Blog System:
This has Reference to the pictures being uploaded on the project website. Under this section an
Individual can comment over photographs based on common parameters like Environments
Safeguards, Quality of works, Social Issues, Suggestion & any other photo related issue. This blog
has been placed in picture section, wherein individual experts/officials can comment on the photo
uploaded by the field PIU or concerned staff, to ask a question or objection over the picture.
The experts / officials can ask questions or suggest changes etc, on the blog portion and the person
who have uploaded the picture shall get an email to respond to the same. In this system, the data
collector also receives a message alert on his telegram messenger as soon as the comment gets
posted by any expert on his picture. The email is also sent to the comment user, data collector and
related PIU as well as DSC of the sub projects.
For e.g. - http://ukdisasterrecovery.in/mis/pic_remark_analysis.php
Quality Perception Report:
Under this section an Expert who are moving to field, can give their ratings to the related work
carried out according to the work program. Quality report describes the materials which are being
used in the field. The rating parameters are Excellent, Very Good, Good, Average, Poor &Worst.
After rating the User/Expert can give some remarks for the activity, also put comment as Over All
Remark. Concerned Experts, PIU and related FPIU also get email as a remark alert by our website.
Link: http://ukdisasterrecovery.in/mis/subproject_quality_ranking_summary.php
Ranking & GAP Report:
GAP Report is to analyse the lead / lag report of subproject from the management information
system for following parameters, such as Physical progress, Quality report, environment & Social
report, total number of pics uploaded per month and test report. This report is a combination of the
all the major reports available in our MIS.
The lists of parameters are mentioned below:-
Physical progress
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 55
Quality report
Environment & Social report
Pictures upload
Test Reports
Link:- http://ukdisasterrecovery.in/mis/package_analysis.php
File Tracking System:
The File tracking system is to help the management analyze the movement of files in the Project’s
internal system. Under this system the following can be measured:-
Number of Instance
Number of movement
Number of acknowledge & closed instance
File moves from one office to another and at times work gets delayed at some point due to some
reasons, this system can calculate time of movement. In this system, the user have to create file and
attempt the instance for sending file to another hierarchy. User also receives a message alert via
SMS when file is acknowledged by another recipient. The email is also sent as an alert to the both
user, and a reminder is also given to users as per suitability. The system has been created to check
the movement of files and to remove any discrepancy in file movement.
Link : www.ukdisasterrecovery.in/filetracking.php
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 56
XI. COMPREHENSIVE REPORT ON SAFEGUARD COMPLIANCE
The social and environment safeguards specialists appointed at the PMU conducted various
trainings and workshops for UDRP staff, Field PIU officials, Design and Supervision Consultants
(DSC), Engineers, Contractors. Two training programs / workshops were conducted in the month of
September one each at Garhwal and Kumaon region. These workshops were intended to share the
findings of the Environment and social Audit. Regular field visits were also undertaken by the team
on most of the project sites. Attempts were made to visit most sites when work was in full swing
and conduct surprise checks so as to capture the ground reality. It was ensured that the copies (both
Hindi and English) of the ESMF are with the PIU’s, field PIUs and DSCs for reference.
The compliance on social and environmental safeguards is also captured in all Monthly Progress
reports submitted by the DSCs as well as the UDRP MIS. Below is a snapshot of the progress on
various social and environment indicators as captured in the MIS. For comparison purposes we
have provided a snapshot up to 31st March, 2017 and 30
th June 2017 respectively.
Overview – Social and Environment Safeguards of PIU – Roads and Bridges as on 01st April
2017 to 30th
June 2017:
Social Safeguards
Social Screening Performed 132
106 (29 Packages Handed
over to Civil Division and
retendering has been done for
3 packages in Pauri out of
which 2 has been awarded)
Status of Compliance with Legal
requirement 0 0
Health check up camps 5 32 (Health Check up camps
are still going on)
Trainings being conducted on
occupational health and safety?
(Give Details)
46 68
Contractual Requirements
Found compliant (out of 134
packages awarded till 31st
March, 17)
Found compliant (out of 132
packages awarded till 31st
June, 17)
Environment Safeguards
Name of designated senior member
(ECOPs) (Contractor) 100 109
Environmental Management Plan 116 124
Environment Screening Performed 134 134
PUC Vehicles 94 100
Labour license 130 131
Workmen compensation Insurance 134 134
Land owner consent for establishment
of Plant site/camp 112
114 (6 packages local labor has
been employed)
Identification of Debris Disposal
Sites
75 (26 Sub projects debris will
be reused in subgrade
preparation and shoulders)
75 (26 Sub projects debris will
be reused in subgrade
preparation and shoulders)
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 57
Land owner consent for
establishment of labour camps 127 106
Hard Hats (Helmet) 132 106
Safety Jackets 132 106
Boots 132 106
Gloves 132 106
Safety Signs 132 106
Child Labours engaged at site 0 0
Any specific labor and local
residents issues 0 0
Public Consultations on site 60 90
Toilets provided 132 106
Land acquisition documented Yes (wherever required) Yes (wherever
required)
Project Information Boards 129 131
Overview – Social and Environment Safeguards of PIU Public Buildings as on 30th
September 2017
Contractual Requirements
Found compliant (out of 20
sub projects awarded till
31st December, 2016)
Found compliant (out of 20
sub projects awarded till 31st
March, 2017)
Environment Safeguards
Name of designated senior member
(ECOPs) (Contractor)
18 18
Environmental Management Plan 20 20
Environment Screening Performed 20 20
PUC Vehicles 19 19
Labour license 20 20
Workmen compensation Insurance 20 20
Land owner consent for establishment of
Plant site 19 19
Identification of Debris Disposal Sites 4 (15 sub projects Debris
will be reused)
4 (15 sub projects Debris
will be reused)
Social Safeguards
Social Screening Performed 20 20
Status of Compliance with Legal
requirement 20 20
Health check up camps 20 2
Trainings being conducted on
occupational health and safety? (Give
Details)
20 20
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 58
UDRP is the first project of its kind where such emphasis has been laid on socially and
environmentally sustainable reconstruction practices. The entire team of UDRP had been sensitized
about this and encouraged to question any practices or activities going against the basic principles
as outlines in the ESMF.
Implementation of environment and social safeguards under the project has helped the team
understand the importance of repeated and constant reinforcement when attempting to usher in a
behaviour change. The social and environmental experts at the PMU, through trainings, workshops
and field visits have tried to educate the project staff as well as contractors about how these
safeguards have to be perceived as an integral part of the reconstruction process. The significant
increase in compliance reflects the awareness of the contractors towards the social and environment
compliances.
Grievance Redressal Mechanism
A robust grievance redress mechanism plays a crucial role in the successful implementation of a
project. A grievance redress system serves to enhance transparency. It ensures that various
stakeholders have a place/portal to register their concerns, questions and rightfully seek answers
from the appropriate authorities. An effective system will also ensure that an issue or concern is
routed to the appropriate authority in case the beneficiary is unaware of this information.
Additionally, GRM also serves as a feedback mechanism necessary for the growth of the project.
With these goals in mind, a Grievance Redress System was set up for the Uttarakhand Disaster
Recovery Project. This process was initiated at the Project Management Unit on 20/03/2014. A two
member team, led by a Social & Community Development-Gender Specialist (SCDGS) was
constituted to operationalize this system. A grievance page was added to the
www.ukdisasterrecovery.in website and the phone number (0315-2708376) designated for
registering complaints was publicized. This number was given out to all PIUs, Field PIUs, district
administration and local media to ensure widespread awareness. The state Disaster Mitigation and
Management Center (DMMC) was also asked to circulate the phone number in all affected districts.
In district Chamoli, public announcements were also used by the district administration to ensure
that people knew about the grievance mechanism amongst other aspects of the project.
Land owner consent for establishment of
labour camps 20 20
Hard Hats (Helmet) 20 20
Safety Jackets 20 20
Boots 20 20
Gloves 20 20
Safety Signs 20 20
Child Labours engaged at site 0 0
Any specific labor and local residents
issues 0 0
Public Consultations on site 0 0
Toilets provided 20 20
Land acquisition documented 0 7
Project Information Boards 20 20
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 59
At the district level, the District Disaster Management Officer (DDMO) is the nodal point for
receiving grievances. A GRM committee has been constituted at the district level in all affected
districts to register and resolve grievances or direct them to appropriate authority. The DDMO
maintains a register of all complaints/issues received related to the project and escalates the issue as
required.
Notwithstanding the way the grievance is received, each reported issue is registered on the project
website along with all necessary details. This is available for public view. A beneficiary or his
representative can also register their grievances directly on the website if they have internet access.
This log of grievances is reviewed weekly by the social and community development specialist at
PMU and a letter sent to the respective PIU urging them to resolve these at the earliest. The GRM
Executive/DEO also contacts the district administration, Field PIU or any other person who may
have the required information to resolve an issue.
Once an issue is resolved, the status is updated on the website. It is also ensured that the
beneficiaries are updated about the progress of their registered complaints and action taken through
calls from the GRM executive/DEO.
Below is a snapshot of the grievance received by the GRM cell from February 2014 to 30th
September 2017:
Sl. No. Issue Total Solved Pending
1 1st Instalment 178 178 0
2 2nd Instalment 295 295 3
3 3rd Instalment 143 143 6
4 4th Instalment 67 67 13
5 Land Related 8 8 0
6 Bridge Related 4 3 1
7 Rent Related 4 4 0
8 Road Related 30 22 8
Total 729 720 9
Month Wise Distribution Calendar Year 2014
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 60
Month Wise Distribution Calendar Year 2015
Month Wise Distribution Calendar Year 2016
Month Wise Distribution Calendar Year 2017
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 61
XII. APPENDIX 1: – DETAILS OF SDRF EQUIPMENTS
S.No Contract Number Method Name of
Package
Contract
Amount
(Lakh)
Status
1
UDRP/TACBDRM/
SDRFII/SHOPPING
/01
Shopping Supply of Power
Tool 2 61.49
Supply order issued to
Machinery Marketing
2
UDRP/TACBDRM/
SDRFII/SHOPPING
/02
Shopping Supply of MFR
(2) 66.82
Supply order issued to L1
Bidder Mgm Associates
3
UDRP/TACBDRM/
SDRFII/SHOPPING
/03
Shopping
Supply of water
and flood rescue
equipment (2)
32.33 Supply order issued to M/S
Cliff Climber
4
UDRP/TACBDRM/
SDRFII/SHOPPING
/04
Shopping
Supply of
Individual Item
(1)
47.81 Supply order issued to M/S
Mount Craft
5
UDRP/TACBDRM/
SDRFII/SHOPPING
/05
Shopping
Supply of
Individual Item
(2)
26.39 Supply order issued to M/S
Cliff Climber
6 UDRP/TACBDRM/
SDRFII/NCB/03-A NCB
Supply of Power
Tool (4) with
three years and
power ascender
84.16
Contract Signed with M/S
Aimtrex Technologies Pvt
Ltd
7 UDRP/TACBDRM/
SDRFII/NCB/06-A NCB
Supply of water
& Flood rescue
Equipments (3-A)
2.53 Contract Signed M/S Integral
Safety Engineers, Mumbai
8 UDRP/TACBDRM/
SDRFII/NCB/010 NCB
Supply of
Extreme high
altitude tents
114.24 Contract Signed M/S Chogori
India Retails Ltd
9 UDRP/TACBDRM/
SDRFII/NCB/011 NCB
Supply of
extreme mountain
rescue gear (1)
59.98 Contract Signed M/S Chogori
India Retails Ltd
10 UDRP/TACBDRM/
SDRFII/NCB/012 NCB
Supply of
extreme mountain
rescue gear (2)
39.66 Contract Signed M/S Chogori
India Retails Ltd
11 UDRP/TACBDRM/
SDRFII/NCB/013 NCB
Supply of
extreme
snowbound
rescue gear
47.00 Contract Signed M/S Cattie
Camps
12 UDRP/TACBDRM/
SDRFII/NCB/013-A NCB
Supply of
extreme
snowbound
rescue gear 2
32.32 Contract Signed M/S
Adventures (India) Pvt Ltd
13 UDRP/TACBDRM/
SDRFII/NCB/014 NCB
Supply of radio
communication
on with 3 yr
AMC
181.66 Contract Signed M/S Surya
Telecom Pvt Ltd
14 UDRP/TACBDRM/
SDRFII/NCB/08 NCB
Supply of
advance rescue
items with three
127.29 Contract Signed M/S Aimtrex
Technologies Pvt Ltd
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 62
S.No Contract Number Method Name of
Package
Contract
Amount
(Lakh)
Status
years AMC
15 UDRP/TACBDRM/
SDRFII/NCB/07 NCB
Water & Rescue
equipments 4
(Cold Water
Rescue suit)
34.33 Contract Signed M/S
Adventures (India) Pvt Ltd
Total 958.01
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 63
XIII. APPENDIX 2: – TECHNICAL TASK FORCE TEAM
Five Technical Task Force Teams were formed comprising of technical experts from respective
fields for supporting the PIU (TA&CBDRM):
S.
No.
Technical Task Force
for Members
1. Slope Stabilization
Office Order No. 99/PIU
(TA&CBDRM)/UDRP-
2014 dated 26.06.2014
1. Secretary, PWD/PD, UDRP, GoUk (Chair person)
2. Deputy Director General, Geological Survey of India
3. Officer nominated by Director, Wadia Institute of
Himalayan Geology, Dehradun
4. General Manager, Tehri Hydro Development
Corporation Ltd
5. Officer nominated by Director, Indian Institute for
Remote Sensing (IIRS), Dehradun
6. Chief Engineer, Public Works Department (Garhwal
Division), Uttarakhand
7. Chief Engineer, Irrigation Department, Dehradun
8. Senior Geologist, PWD, Dehradun
9. Executive Director, DMMC, Dehradun
10. Officer nominated by Director, IIT, Roorkee
11. Deputy Director, Geological & Mining, Uttarakhand
12. Program Manager/Deputy Program Manager, PIU
(TA&CBDRM)
2. River Morphology and
River Training Works
Office Order No.
144/PIU
(TA&CBDRM)/ UDRP-
2014 dated 26.08.2014
1. Secretary, Irrigation, Government of Uttarakhand
(Chairman)
2. Secretary, PWD/Program Director, UDRP, GoUK
(Vice-Chairman)
3. Officer nominated by Director, IIT, Roorkee
4. Officer nominated by Director, Indian Institute for
Remote Sensing (IIRS), Dehradun
5. Superintending Engineer, Central Water Commission,
Dehradun
6. Superintending Engineer, Irrigation Research Institute,
Roorkee
7. Chief Engineer, Irrigation Department, Government of
Uttarakhand, Dehradun
8. Officer nominated by Director, Central Water and Soil
Conservation Institute, Dehradun
9. Program Manager/Deputy Program Manager, PIU
(TA&CBDRM) [Coordinator]
3. Multi Hazard Early
Warning System
(MHEW) &
Modernization of
Hydro-Met Observation
in the State
Office Order No.
295/PIU
(TA&CBDRM)/UDRP-
2014 dated 31.03.2015
1. Secretary, PWD/Program Director, UDRP, GoUk
(Chairman)
2. Secretary, Disaster Management & Rehabilitation,
Government of Uttarakhand
3. Additional Secretary/Program Manager, PIU,
TA&CBDRM
4. Officer nominated by Director, Uttarakhand Space
Application (USAC), Dehradun
5. Director, Indian Metrological Department, Dehradun
6. Superintending Engineer, Central Water Commission,
Dehradun
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 64
S.
No.
Technical Task Force
for Members
4. Technical Task Force
for Disaster Risk
Assessment under Office
Order No. 294/PIU
(TA&CBDRM)/ UDRP-
2014 dated 31.03.2015
1. Secretary, PWD/Program Director, UDRP, GoUK
(Chairman)
2. Secretary, Disaster Management & Rehabilitation,
Government of Uttarakhand
3. Additional Secretary/Program Manager, PIU,
TA&CBDRM
4. Dr P.K. Champati Rai, Principal Geologist, Indian
Institute of Remote Sensing (IIRS), Dehradun
5. Officer nominated by the Director, IIT, Roorkee
6. Officer nominated by Director, Wadia Institute of
Himalayan Geology, Dehradun
7. Member nominated by Director, Geological Survey of
India, Dehradun
5. Technical Task Force
for Decision Support
System Office Order No.
373/PIU
(TA&CBDRM)/UDRP-
2015 dated 11.06.2015
1. Secretary, PWD/Program Director, UDRP, GoUk
(Chairman)
2. Secretary, Disaster Management & Rehabilitation,
Government of Uttarakhand
3. Additional Secretary/Program Manager, PIU,
TA&CBDRM
4. Dr P.K. Champati Rai, Principal Geologist, Indian
Institute of Remote Sensing (IIRS), Dehradun
5. Member nominated by Director, Information
Technology Development Agency, Dehradun
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 65
XIV. APPENDIX 3: – TEAM FOR VETTING OF REPORTS
Reports, Design, DPR, BOQ etc submitted by consultant to PIU (TA&CBDRM) are vetted by the
following institute/department of the state-
S.
No.
Name of the
Consultancy Consultancy Firm Vetting Agency
1.
Disaster Risk
Assessment of
Uttarakhand
DHI (Singapore) – ATI
(Thailand) – ERN (Mexico) JV
Indian Institute of Technology
(IIT), Roorkee
2.
River Morphological
Analysis and Design of
River Training and
Bank Protection work in
Uttarakhand
DHI (India) – RITES Ltd JV Irrigation Research Institute
(IRI), Roorkee
3. Slope stabilization and
river training work WAPCOS Ltd (India) THDC India Ltd, Rishikesh
Team of Vetting Agency are:
1. Indian Institute of Technology (IIT), Roorkee
S. No. Name of Expert Position in Vetting Team
1. Dr. M. L. Sharma Group Leader
2. Dr. R.S. Jakka Geotechnical Engineer
3. Dr. Yogendra Singh Civil Engineer (Structural)
4. Dr. Manish Shrikhande Earthquake Engineer
5. Dr. N.K. Goel Morphological modeler/analyst
6. Dr. Josodhir Das Geologist
7. Dr. Sandeep Kumar Software Engineer/Data base Specialist
8. Dr. A.K. Saraf RS/GIS Specialist
9. Dr. Z. Rahman Economic Expert
10. Dr. Rajat Agarwal Social Expert
2. Irrigation Research Institute (IRI), Roorkee
S. No. Name of Expert Position in Vetting Team
1. Mr. D.K. Agarwal Group Leader
2. Asst. Prof. V.K. Verma Civil Engineer (Design)
3. Mr Ajay Sharma Hydrologist
4. Mr.Vimal Garg Morphological modeler/analyst
5. Asst. Prof. Lopamudra Saha Geologist
6. Mr Rahul Singh Environment Specialist
7. Mr. Nilanjan Das Social Expert
8. Mr. Pankaj Sharma Software Engineer/Data base Specialist
9. Mrs. Nandani Chaudhary RS/GIS Specialist
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 66
3. THDC India Ltd, Rishikesh
S. No. Name of Expert Position in Vetting Team
1. Mr. Gajendra Singh Group Leader
2. Mr. Niraj Kumar Agarwal Hydrologist
3. Mr. Pradeep Kumar Civil Engineer (Design)
4. Mr. Ajay Kumar Geologist
5. Mr. Avkesh Kumar Procurement Expert
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 67
XV. APPENDIX 4: - HIGH POWER COMMITTEE (HPC) MEETINGS
A. HPC Meetings from April to June, 2017
S.
No. HPC Minutes of Meeting Issued
Meeting
Date
1 PIU PB, and PIU TA&CBDRM: Letter No. 94/PMU/UEAP/2017 dated
17.07.2017
05.07.2017
2 PIU TA&CBDRM, PIU R&B, PIU PB: Letter No. 95/PMU/UEAP/2017
dated 20.07.2017
18.07.2017
3 PIU R&B, PIU PB: Letter No. 122/PMU/UEAP/2017 dated 31.08.2017 23.08.2017
4 PIU R&B & PIU TA&CBDRM: Letter No. 151/PMU/UEAP/2017 dated
21.09.2017
18.09.2017
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 68
XVI. APPENDIX 5: - SITE PHOTOGRAPHS
Roads & Bridges Program
Bansu-Tyuri MR Dea Guptkashi
Rudraprayag
Box Type culvert near Garhmirpur Dea tehri-
Chakrata Haridwar
Chepado Bridge Dea Karanprayag Chamoli
RHS A1 Anchor
Kanda Saniaudiya Rawatsera Motor Road,
Bageshwar
Ratura Suspension Bridge DEA Guptkashi
Rudraprayag
Ogla Pathak Gaon narath-Bhagichauri MR
Preparing mix Dea Askot Pithoragah
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 69
Public Buildings
Primary School, Anganwadi, Community Center and Health Sub-Center at Kuwari Bageshwar
Primary School Barsu, District Rudraprayag
60 Seater Hostel Building in Govt. P.G College
Agastmuni (SVAGRIHA), District
Rudraprayag
Primary School Gandhari, District Rudraprayag
Construction of State Allopathic Dispensary
Pandukeshwar, District Chamoli
Project ID: P146653 Progress Report-10 India: Uttarakhand Disaster Recovery Project Jul – Sep 17
UDRP-PMU, Dehradun Page 70
Primary School Timili Badma, District Rudraprayag
Primary School Panjana, District Rudraprayag
Primary School Kaviltha, District Rudraprayag
Govt. Inter College Parkandi, District Rudraprayag
Govt. Inter College Kotgi, District Rudraprayag
Ladies Police Station – Transit Hostel, Srinagar, District
Pauri