THE WORLD BANK GROUP ARCHIVES
PUBLIC DISCLOSURE AUTHORIZED
Folder Title: Fertilizer Expansion and Plant Operation Project - Trombay Fertilizer - Credit 0481 -P009685 - Correspondence - Volume 3
Folder ID: 30360688
Project ID: P009685
Dates: 6/2/1975 - 1/23/1976
Fonds: Records of the South Asia Regional Vice Presidency
ISAD Reference Code: WB IBRD/IDA SAR
Digitized: 5/15/2019
To cite materials from this archival folder, please follow the following format:[Descriptive name of item], [Folder Title], Folder ID [Folder ID], World Bank Group Archives, Washington, D.C., UnitedStates.
The records in this folder were created or received by The World Bank in the course of its business.
The records that were created by the staff of The World Bank are subject to the Bank's copyright.
Please refer to http://www.worldbank.org/terms-of-use-earchives for full copyright terms of use and disclaimers.
MTHE WORLD BANKWashington, D.C.
@ International Bank for Reconstruction and Development / International Development Association orThe World Bank1818 H Street NWWashington DC 20433Telephone: 202-473-1000Internet: www.worldbank.org
INDIA -Credit 481 IN
RETURN TO ARCHIVES IN MC C3-120I
ISN # A CC# 30360682R1980-017 Other # 31-12 Box # 7599flBOXFertilizer Epansion and Plant Operation Project - Trombay Fertilizer -NUCredit 0481- P009685- Correspondence - Volume
NUS LOCATION Z~ 7
FORM NO. 635(7-74)
This file is closed as of )A .&
For further correspondence, please see
RECORDS MANAGEMENT SECTION
TIHE FERTILIZER CORPORATION OF INDIA LIMITED(GOVERNMENT OF INDIA UNDERTAKING)
(TROMBAY EXPANSION)
Gram: 'FERTILIZER' BOMBAY 74. SOMBAY-400 074Telex : 011-3027 SUPHALA B.P. Garodia Phone: 522295/5 2 1451
Dy.Materials Manager(Expn.)
Our Ref. No. PUR ELPN/WB/41 23 Jan 1976
Deer Yr. Tortorelli,
Subjec TRCMBAY IViof documents
Purchase Order No. XY/12/10177for Pressure Gauges.
Kindly find enclosed one set of our subject order
copy for pressure Gauges ordered on il's Alexander Weigand,
West Germany for favour of your information and further necessary
action.
With Best Regards,
Yours sincerely,
(B.P. Garodia)
Mr. E. Tortorelli,Industrial Project Department,International Bank for Reconstruction
& Development,1818 H. Street N.W.,Wshington D.C. 20433.U.S.A
THE FERTILIZER CORPORATION OF INDIA LIMITED(GOVERNMENT OF INDIA UNDERTAKING)
(TROMBAY EXPANSION)Telegrams: IFERTILIZER' (.P. Garod ia) BOMBAY-74. (AS)
BOMBAY-74. Dy.aterials anager Phone: 522267521451
Our Ref. No. Pur/EPN/WB/4O 23_January,__ 19 76
D Mr. Tortorelli,
Subi ect TROMZAY IVSuLXissi f documents
ase Order No.PiY/12/10176for Programmers.
Kindly find enclosed one set of our subject order eopy for
Programners ordered on M/s. ELNST TESCH KG, West Germany, for
favour of your information and further necessary action.
With best regards,
Yours sincerely,
(B.P. Garodia)
Mr. E. Tortorelli,Industrial Project Department,International Bank for Reconstruction
& Development,1818 H . Street N.W.,Washington D.C. 20433,U. S. A.
R2CENEj
.41" JAN 30 AM t 47. hIGMAl r
asea3ruapOu 9.* O 43
* E 10 0ar
J~~ 7 1~ O ~2
!'jucrJAont l uclreu a Ap~9^0L O C XAOfL TL OL!g ou aIIY IJCGSA 9cDp4Kou*
HEC L ou L:\2* --a O 4- i i nU)K uojA ::;Ug~ j JToeq u Q e S 001 Q, npGcS 0me gobL ~ ,OL
QiVft Ge
?3 I 2?
(IVNOWSVA EK hVI4IOM i)
(GOAEVMWEtA Otk I1DIV flvDEl'XYKIWG)IHE hELiLIFIXEB CO~bOBViIQL1 Oh MIDIV FI~LNIIED
THE FERTILIZER CORPORATION OF INDIA LIMITED(GOVERNMENT OF INDIA UNDERTAKING)
(TROMBAY EXPANSION)Gram: 'PERTILIZER' BOMBAY 74. SOMBAY-400 074Telex : 011-3027 SUPHALA (B.P. Garodia) Phone: 5222951521451
Dy.Materials Marmger(Expn.Our Ref. No. =EJ/XCPN/WB/42 23 Jan 1976
Dear Mt. Tortorelli,
Subjec :TRcaBRAY IVission docunento
Purchase Order fio. PX-/12/10154or Solenoid Valves.
Kindly find enclosed one set of our subject order
copy for Solenoid Valves ordered on M/s Klaus Fischer, West
Germany for favour of your information and further necessary
action.
With Best Regards,
Yours sincerely,
(B.P. Garodia)
Mr. E. Tortorelli,Industrial Project Department,International Bank for Reconstruction
& Development,1818 H. Street N.W.,Washington DC 20433.U.S.A
THE FERTILIZER CORPORATION OF INDIA LIMITED(GOVERNMENT OF INDIA UNDERTAKING)
(TROMBAY EXPANSION)Gram: 'FERTILIZER' BOMBAY 74. B.P. arodia BOMBAY-400 074Telex : 011-3027 SUPHALA Dy.aterials Marager(Expn.) Phone: 52229 5 /5 2 1 45 1
Our Ref. No. ____________ __ 197
Dear mr. TortoreLli,
Subject: TRCTBAY IVSubmission of documentsPurchase Order No: PX/12/10175for Pressure Switches.
Kindly find enclosed one set of our subject order
copy for Pressure Switches ordered on V/s OTA Industriegeraete GmbH,
West Germany for favour of your information and further necessary
action.
With Best Regards,
Yours Sincerely,
(B.P. Garodia)Mr. Tortorelli,Industrial Project Department,International Bank for Reconstruction
1818 H. Street, & Development,
N.W. Washington DC 20433U.S.A
THE FERTILIZER CORPORAION OF INDIA LIMITED(GOVERNMENT OF INDIA UNDERTAKING)
(TROMBAY EXPANSION)Gram: 'FERTILIZER' BOMBAY 74. SOMBAY-400 074Telex: 011-3027 SUPHALA (B.P. Garodia) Phone: 522295/521451
Our Ref. No. PV PIVWB/44 Dydaterials mager(b n) 23 Jan 19 76
Dear Mr. Tortorelli,
Subje :TRCMBAY IVSubmission o documentsPurchase er No. PX/12/10156
umetric Flowmeters.
Kindly find enclosed one set of our subject order copy
for Volumetric Flowmeters ordered on T/s BOPP & REUTHER GNBH,
West Germany for favour of your information and further necessary
action.
With Best Regards,
Yours Sincerely,
(B.P. GarodiaT
Mr. TorLorelli,Industrial Project Department,International Bank for Reconstruction
& Development,1818 H. Street,N.W. Washington DC 20433U.S.A
P* E
JAN 30 AM It: 9
MT~ 1P 7ee 17
42B y I u u GOc. GAG #NJNsG Mof ou rlc 7grc
7, jq , 7"" O OfI jT IC GL *
or".~ L"' GL
M-OI 2n vr bOJFJ L-JYTL GG Q
1 V L .L'L 7 nOOLV(ow
ORA6 L II
IGUH J Ll A AQJ SE011 AJT I 1 V .I A-7GCG
;o~poniei wOEMIEM OL -IDG GMD g1J 2M
.LHE k~ilflEH CI. C~lfl/~L1 Cb iGL2I iE
THE FERTILIZER CORPORATION OF INDIA LIMITED(GOVERNMENT OF INDIA UNDERTAKING)
(TROMBAY UNIT)TELEGRAMS: FERTILIZER Marval, Chembur.PHONE: 52 1451 BOMBAY 400 07A,
Our Re(. No. /42/ 2 5 . Bombay, Dated the 23rd Jan.,9 76
Mr. E. Tortorelli,International Bank for Reconstructionand Development,Industrial Project Dept.,1818 H. Street,N.W. Washingt,.-on,D.C. 20433,
Sub Contract documents for procurement ofNeutral Earthing Resistors for Transformers.
Dear Sir,
Enclosed please find following documents on procurement
of 8 Nos. Neutral Earthing Resistors for Power Power Transformers
in the electrical distribution system of Trombay-IV.
1. Purchase Order.
2. Bid Comparison.
3. Bid Selection.
4. List of parties.
5. Format 384.
These documents are send to you for your kind informationand record.
Please acknowledge,
Thanking you,
Yours faithfully,
(B.P. GARODIA)DY. iATERIALS MANAGER(EXPN.)
FORM NO. 2 WORLD BANK / IFC IBRDOUTGOING MESSAGE FORM IDA
(TELEGRAM/CABLE/TELEX) IFCEl ics'D
TO: FERTILIZER CORPORATION OF INDIA LTD. DATE: JANUARY 22, 1976TROMBAY UNITBOM1BAY ORIGINATOR'S EXT.: 6958
COUNTRY: INDIA CLASS oF TELEX: 1-13027SERVICE:
CABLE NO. & TEXT: FOR MATERIALS MANAGER. TROMBAY IV.
REURLET OF JANUARY 8, 1976 HAVE RECEIVED PURCHASE ORDER FOR TENDER
PXK/12/A0135 FOR CONTROL VALVES. WE NEED DID EVALUATION DETAILING
REASON FOR AWARD TO GULDE REGELARMATUREN.
WE ALSO NEED WITHDRAWAL APPLICATIONS FOR THIS AND ALL OTHER PURCHASE
ORDERS IN ORDER TO PROCESS PAYENTS.
REGARDS
LIETARD
NOT TO BE TRANSMITTDREFERENCE: OCabrera/om - IDIA Trombay IName):
DRAFTED BY: DEPARTMENTIndustrial Projects
CLEARANCES AND COPY DISTRIBUTION: SIGNATURE (Of individua orized toapprove):Cc'. lfessrso Dewey
Perram, Tortorelli, Shetty SECTION BELOWFOR USE OF BLESECTIONEspiritu, Robbin, Hamilton CHECKED FOR DISPATCH:
PINK - File Copy; WHITE - Transmittal Copy; YELLOW - Bill Copy
THE FERTILIZER CORPORATION OF INDIA LIMITED(GOVERNMENT OF INDIA UNDERTAKIN ) J-
(TROMBAY EXPANSION) A.Gram: 'FERTILIZER' BOMBAY 74. SOMBAY-400 074Telex: 011-3027 SUPHALA B.P. Garodia Phone : 5222 95 /5 2 145 1
Dy. Materials Manager(Expn.)
Our Ref. No. Pu/pynAr /q/gg 20 Jan. 1976
Dear Mr. Tortorelli,
Sub: TROMBAY IVSubmission of NIT,List of partiesand Purchase Order copies. O 4 ,,/
Kindly find enclosed one set of our Notice
Inviting Tender, List of parties and Two sets <f
Purchase Order Copies in respect of our oraer tr
Pneumatic Level Transmitters ordered on Vs .J C.ckardt
AG, West Germany. This is for favour of your iaormation
and record.
With Best Wishes,
Yours sincerely,
(B.P. Garodia)
Mr. E. Tortorelli,Industrial Project Department,International Bank for Reconstruction & Development,1818 H. Street N.W.,Washington D.C. 20433,U.S.A.
U3TIMIJ AI#II :0 I /OITAROARO3 R3SIJITR3i 3HT@WfIATs3aU A10M1 10 T3MWR3VO@)
MOI3MAiXii YAS4ONT )MO OY-YA8MO8 .bT YASMO8 'R3IX ITAR3A mwiD
r2 s e a fniibO1. * AJAHqU? VOW-rN0 xeleT
(. nqxa) iepsnasM aLSLa5M .yE
aver- .L7T O& \ .o19 v1eF luO
VI YA8MO5T :du8FqIjtisq o alad,TIU Io icdabimdu8
PS.Lgcaot ieb0 SesrDxuq bcw
SD IJO auo lo e sno beaolons bnII yfbaiA
P,$ aowT bts astziq )o taJ 10lbnei p-iibvuI
Pba 2. tr no bg efyo a ieJJmas2T Lev9J oIsmuenq
noiis& FJoy Lo auovl lol at a dT .ynr eSD dsW ,DA
,eede W tasH iW
Yvfi~ca s 8iuoY
fllisoY-oT .a .xM
,dTanemq-oI9VsU 3 no ~Lrxtanoo5I si&l (AnR 1iol vEd IU
.W.M i *oacx .oH n1f
.A.a.U
THE FERTILIZER CORPORATION OF INDIA LIMITED(GOVERNMENT OF INDIA UNDERTAKING)
(TROMBAY EXPANSION)Gram: 'FERTILIZER' BOMBAY 74. BOMBAY-400 074Telex : 011-3027 SUPHALA B.P. Garodia Phone: 522295/521451
Dy.Materials Manager(Expn.) c9Our Ref. No. PUR/EXP/WB/38 19 Jan. 19 76
Dear Mr. Tortorelli,
Subs TROMBAY IVSubmission of PurchaseOrder copies.
... 7SKindly find enclosed one set of Purchase
Order in respect of spares for Proprietory Equipment
supplied by W4s Friedrich Uhde GmbH, West Germany as
per terms of main contract with them. This is
submitted for favour of your information and further
necessary action.
With Best Regards,
Yours sincerely,
(B.P. Garodia)
Mr. E. Tortorelli,Industrial Project Department,International Bank for Reconstruction & Development*1818 H. Street 6.w.,Washington D.C. 20433,U.S.A
976JAN 28 FM2 WUS
.OMMUNICATIV
MSJTUdfOVJ D*C* w433'
IU4Z6Lagg~ougT jguy got ~GcoUeLflC UOU W DGA6TOBWeu '
IUqg7agLT9T brLO~hG4 DGbgLWGL1u'ALt E' JJot4oOLTTT'
(B~b TgLroqT9)
~Of1L 2TUCGL6TA'
MT4J B
uecgaagLA cgOj
anpWTfTG q JOL 19AOOL OT AOffL TUDToU 'JUq tnLTh4IGT-
bGL :rau2 o; i9TIJ COUfLgcg T4 :P lJTS Ts
aabbT Tq pA W\2 ELTC(tTCy nPgq6p CWPH' MI4 A g
oLqGL TO LGebic;- ot abgL2 :oL bLobLTG4 OMA EdOTbweu4
KTUqTX Ug ucoaeq ous 264 o BntcPa6
Ozgcq cobTGR2flPWTaaTOL Og b04JcyGa
20P I JOWBYl IA
DG9L WIL* LOLfOL6OTT 7
0Q' lL M bfM\E)b~4\MB\Th a 1D2*W96LT9TJ WgUgd6L(Exbu*3)
O4J : i-3OA 2flbHvrv 1b bpOue 2563ap\254G4
eaW: a:gkLIr IEI(. 9SO BVA 14 BOVI9YA-400 0.1
( vNiyRA EXbI42MIOM )
(OAEMvINE V1 O IWDIv OLDEHi vkime)
IHE E.iFISEd COHbOHVilOVI OL IIDIV LIED
January 19, 1976
Mr. S. C. De BaksiChief igineer (Expn.)THE FERTILIZER CORPORTATION OF INDIA LTD.Bombay, INDIA
Dear Mr. De Baksi,
Re: Credit No. 481-IND
This is to acknowledge receipt of knd thank you foryour letter &f January 5, 1976, enclosing your Monthly ProgressReport No. 19 for the month of December 1975.
Sincerel -ours,
Chauncey F. DeweyChief of Diision III
Industrial Projects Department
cc: Messrs. Tortorelli, Shetty, Lietard
JMSoncini: ba
FORM N 27 WORLD BANK / IFC J lBRDOUTGOING MESSAGE FORM i IDA
(TELEGRAM /CABLE /TELEX) El InCSICsID
TO: FERTILIZER CORPORATION OF INDIA DATE: January 1 , 1976
TROMBAY UNIT ORIGINATOR'S EXT.: 6958
COUNTRY: BOMBAY CLASS OF Telex: 113027SERVICE:
CABLE NO, &TEXT: INDIA
FOR MATERIALS MANAGER RE OUR LOAN 481-INDIA-TRmAy IV.
REURLETS OF JANUARY 7 AN] 9 1976 WE HAVE NO OBJECTION TO AWARDS
PURCHASE ORDERS AND OPENING OF LETTERS OF CREDIT ACCORDING TO FOLLOWING
ENQUIRIES :
PiZ/M/10148 - PIPES AND FITTINGS TO SUMITOMO SHOSI MITSUI AN) CO.
TOHO BHUSSAN, NISSHO-IWAI AND SANDVIK ASIA.
PXZ/M/10208 - YARD PIPING AND FITTINGS TO MITSUI AND CO.
TOHO BRUSSAN, AMERICAN ALLOY.
PXZ/13/1O224 - VALVES TO ARMATUREN RING, SANTOKU SHOSI,
NISSHO-IWAI.
IT IS ABSOLUTELY ESSENTIAL THAT WE RECEIVE IMMEDIATELY THE WITHDRAWAL
APPLICATIONS IN ORDER TO PROCESS THESE DISBURSEMENTS.
REGARDS
TORTORELLI
NOT TO BE TRANSMITTEDREFERENCE: AUTHORIZED BY larl:
Trombay IV dortorel-li
DRAFTED BY: DEPARTMENTCCabrera:gj Industrial Projects
CLEARANCES AND COPY DISTRIBUTION: SIGNATURE (Of individual authorized to approve):cc: Messrs, Dewey
Perram, Shetty, C abrera SECTION BELOW FOR USE OF CA LE SECTION
Mrs. R H lon CHECKED FOR DISPATCH:
PINK - File Copy; WHITE - Transmittal Copy; YELLOW - Bill Copy
FORM NO.27 WORLD BANK / IFC IBRDOUTGOING MESSAGE FORM IDA
(TELEGRAM/CABLE/TELEX) IFCE] IsID
TO: FERTILIZER CORPORATION OF INDIA, LTD. DATE: JANUARY 16, 1976TROMBAY UNITBOMBAY ORIGINATOR'S EXT.: 6958
cOUNTRY: INDIA CLASSOF TELEX: 113027SERVICE:
CABLE NO. &TEXT: FOR MATERIALS MANAGER. TROMBAY IV
REURLETS OF JANUARY 9, 1976 WE HAVE NO OBJECTION TO OPENING OF
LETTERS OF CREDIT, AWARDS AND PURCHASE ORDERS FOR FOLLOWING ITEMS:
1. FOR S.S. VALVES TO ARMATUREN-RING
2. FOR PIPES AND FITTINGS TO TROUVAY AND COUVIN, CHEMETRON AND MITSUI.
WILL PROCESS THE OTHER ITEMS AS SOON AS WE RECEIVE DOCUMENTATION.
PLEASE SEND WITHDRAWAL APPLICATIONS FOR ALL ITEMS.
REGARDS
TORTORELLI
NOT TO BE TRkQMIfTgbd ;REFERENCE:
CEabrera/om -_Trombay IV T_ R14ortorelli
DRAFTED BY: DEPARTMENT:
Industrial ProjectsCLEARANCES AND COPY DISTRIBUTION: SIGNATURE (Of - Iau arized to.pprove):cc. Mesors. Dewey
err, Setty, E spiritu SECT ION BELOW FOR USE OF CABLE SECTIONRobbin - F510 CHECKED FOR DISPATCH:Hamilton - CC1;E 1,
PINK - File Copy; WHITE - Transmittal Copy; YELLOW . Bill Copy
248423A~ I<D US INC HING TELE J ., ssDISTRIBUTION:
(L A 0 1 (Telex NO. Industrial ProjectsMr. AlisbahMr. Perch-Cont
.I11 15.1.1 71 11- . T r. Blobe C C
FJ _7CTL C . IIA LTD.,
0 , A I 0 IA
UT T T 7~ K)I
T( .J I I
C ViiY ATICAL FO 1;<JECT C iULL
YC R :L7?ET 7" T. O" (?OU> A.29 VAL 27 L TE 07 097EIIT LY
A- G
1"PAL 7) L0- I7
-C)
C~ v F.
t2~J~:f-
UP 1' (p L , 11
INTERNATIONAL DEVELOPMENT INTERNATIONAL BANK FOR INTERNATIONAL FNANCEASSOCIATION RECONSTRUCTION ANDDEVEOPMENT CORPORATION
OUTGOING WIRE
TO: FERTILIZER CORPORATION OF INDIA LTD. DATE: JANUARY 12 976TROMBAY UNITBOMBAY CLASS OF TEx.-I3i27
SERVICE:Ext. 6958
COUNTRY: INDTA
TEXT: FOR MATERIALS MANAGER. RE TROMBAY IVCable No.:
REURLET OF DECEMBER 18/75 WE HAVE NO OBJECTION TO YOUR PLACING
PURCHASE ORDER WITH JXOTI FOR 11000 V. SWITGHBOARD (OUR REF.
PXT/42/10142A) AND WITH NGEF FOR -1000 V. ISOLATOR PANEL (OUR
REF. FXT/42/10142B).
REURLET OF DECEMBER 1/75 WE HAVE NO OBJECTIONt TO YOUR PLACING
PURCHASE ORDER WITH NACNALLY BHARDT ENGG. FOR PNERATIC TRANSPORT
SYSTEM (OUR REF. PXT/16/10070).
REGARDS
TORTORELLI
NOT TO U TRAt4MrffED
AUTHORIZED BY: CLEARANCES AND COPY DISTRIBUTIONcc: Messrs. Dewey
NAME E. Tortorelli Perram, ShettyEspiritu (Ms)
DEPT. Industrial Projects Department Robbin (Ms) - F5
StGNATURE Hamilton (Ma) - 514
(SIGNATURE OF INDIVIDUAL AUTHORIZED TO APPROVEREFERENCE: Cabrera/om - Trombay I For Use CWmnkati io
ORIGINAL (File Copy)(IMPORTANT: See Seweterls Gukds for preparing forv) Chocked fr Dispatci
Form No. 27(3-70)
INTERNATIONAL DEVELOPMENT INTERNATIONAL BANK POR INTERNATIONAL FINANCEASSOCIATION RECONSTRUCTION AND DEVOPMENT CORPORATION
OUTGOING WIRE
TO: DURFERT DATE JANUARY 12, 1976DURGAPUR
CLASS OF TELEXrt-SERVICE:
SERVCE-Ext. 6958
COUNTRY: INDIA
TEXT: FOR GENERAL MANAGER.Cable No.
REURET ACMEAS-3/75 DATED NOVEIBER 28/75 WE HAVE NO OBJECTION TO
LIST SUPPLIERS FOR RF'ORMER TUBE AND OUTLET PIGTAIL,
REURLET DP ;MN :EES:7105 DATED NOVEBER 27/75 WE HAVE NO OBJECTION
TO TENDER PACKAGE FOR REFORMER TUBE AND OUTLET PIGTAIL.
REGARDS
TORTORELLI
NOT TO BE TRAt4SM#TU)
AUTHORIZED BY- CLEARANCES AND COPY DISTRIBUTION:
NAME BT cc: Messrs. Dewey.Tortorelli Perra, Shetty
Espiritu (Ms)Indust: Projts Department Robb:in - F510
SIGNATURE'H Hamilton - C.514(SIGNATURE OF INDIVIDUAL AUTHORIZED TO APPROVE)
lEFERENCE' CCabrera/om - Durgapur (Tromba Fwr Use By tios Secon
ORIGINAL (File Copy)(IMPORTANT; See Secretaries Guid. for preparing form) Chkod fo( Dipatf
TELEX: 029-216 PLANDEVTELEPkiONE JHARIA 60110. 60160, 6QO6,TELEGRAM: XS1NDX SINDR1
THE FERTILIZER CORPORATION OF INDAfWti.SINDRI MODERNISATION PROJECT
REF. NQ. SM/MM/ICB/ELECT./2/C ' fnt +rIGAI- - P. . SINDRI,DIST. DHANBAD, BIHAR.
PIN CODE-1326122
CINDIA
SINDRI, THE 12th Jan. 1976
BY AIR IATL
The Industrial Project Department,International Bank for Reconstruction & Development,1818 H. Street, N.W.,Washington DC - 20433,U.S.A.
Attn: Mr. G. Evans,
PROJECT : 1017 - SINDRI MODERNISATION PROJECT.
SUBJECT : P R 0 C U R E M E N T
We are forwarding herewith copy of Enquiry
No. SICB/1017/75/ELECT./2/29 dated 2/1/1976., alongwith
the list of firms to whom enquiries are issued for your
information and records.
DY.MATERIALS MANAGER (SMP)
Encl: As stated.
Relistered Ofic :
F 43. Ring Road, Nanga, Trorbay, Durgapur.
south Extension Arca, Namrup, Gorakhpur, Barauni
Pa-t 1. New Delhi-3 Korba. Ramagundam,
CT
Sa V,"- . -
I I ELEX248423B IBRD UR
SUPHALA 0113027 (Telex Nr)Distribution: hdustri l Pro jete
Aliebeh
MSG 8.93 10.1.1976 1.26 PM IST 1916 JN 3 er
FROM: GENERAL PROJECT MANAGER (EXPN) FERTILIZER CORPN S ,ub'IA
LTD., BOMBAY INDIA
FOR: MR E TORTORELLI INDUSTRIAL PROJECTS DEPARTMENT.
GAINST YOUR CREDIT 8. IN-491 AND OUR ENQUIRY E. PXZ/M/10148
FOR PIPES AND FITTINGS WE HAVE AIR MAILED ON 7/1/76 ALL NECESSARY
DOCUMENTS FOR YOUR APPROVAL FOR OPENING OF LETTER OF CREDITS.
SINCE DELIVERY OF THESE PIPES AND FITTINGS IS VERY CIRITICAL
FOR PROJECT SQ+ SCHEDULE YOU ARE REQUESTED TO SEND YOUR APPROVAL
FOR OPENING OF LETTER OF CREDITS AT EARLIEST PREFERABLY BY TELEX.
YOUR EARLY ACTION IN THE MATTER WILL BE HIGHLY APPRECIATED.
MATTER MOST URGENT...
INCOMING TELEX
Distribution:2484233 IBRD UR [ndustrial Projects/
Mr. PlisbeiiSUPHALA 0 113027 (Telex 'r) Cont. 1Mr.Verch
. Blobel
MSG E.95 10.1.1976
FROM: GENERAL PROJECT MANAGER (EXPN) FCI LTD., BOMBAY
FOR: MR E TORTORELLI
AGAINST YOUR CREDIT IN:481 AND OUR ENQUIRY PXZ/M/10192 FOR PIPES
AND FITTINGS WE HAVE AIR MAILED ALL NECESSARY DOCUMENTSON 9/1/76
FOR YOUR APPROVAL OF OPENING OF LETTER OF CREDIT. S~bF- SINCE
DELIVERY OF THESE PIPES AND FITTINGS, IS CRITICAL FOR OUR PROJECT
SCHEDULE REQUEST TO SEND YOUR APPROVAL FOR OPENING OF LETTER OF
CREDIT BY TELEX.
MATTER MOST URGENT.
90VER
INOCQ IG TELEX E
243423B IBRD UR DiStribu -ion:Industri:1 Projects,
SUPHALA 0113027 (Telex 11(r) 1 - lib-h. -r c h
. lobel 9I6
MSG E.96 10.1.1976SECT 0
FROM: GENERAL PROJECT MANAGER (EXPN) FCI LTD., BOMBAY
FOR: MR E TORTORELLI
AGAINST YOUR CREDIT E. IN:481 AND OUR ENQUIRY PXZ/M/10208 FOR PIPES
AND FITTINGS WE HAVE AIR MAILED ALL DOCUMENTS ON 9/1/76 FOR YOUR
APPROVAL OF OPENING OF LETTER OF CREDIT. SINCE DELIVERY OF THESE
PIPES AND FITTINGS IS VERY CRITICAL FOR OUR PROJECT SCHEDULE
REQUEST TO SEND YOUR APPROVAL FOR OPENING OF LETTER OF CREDIT
BY TELEX.
MATTER MOST URGENT.
OVER
FRO: BOMBAY IAO.ING TEX -
248423B IBRD UR Distribution: IndustriJl ProjectsMr. 1..isbah
SUPHALA 0113027 (Telex - ) Cont. kr. Berce1lMr. Blobel OA
MSG 8.94 10.1.1976
FROM: GENERAL PROJECT MANAGER (EXPN) FCI LTD., BOMBAY
FOR: MR E TORTORELLI
AGAINST YOUR CREDIT B. 481 AND OUR ENQUIRY PXZ/13/10145 FOR VALVES
WE HAVE AIR MAILED ON 8/1/76 ALL NECESSARY DOCUMENTS REQUIRED BY
IN+ YOU FOR YOUR APPROVAL OF OPENING LETTER OF CREDIT. SINCE
DELIVERY OF THESE VALVES 40=4- IS CRITICAL FOR OUR PROJECT SCHEDULE
AND PARTY IS INSISTING ON OPENING OF LETTER OF CREDIT BY 12/1/76
YOU ARE REQUESTED TO SEND YOUR APPROVAL FOR 4W OPENING LETTER OF
CF+ CREDIT AT AN EARLY DATE BY TELEX. KINDLY TREAT THE MATTER
iS MOST URGENT.
OVER
THE FERTILIZER CORPORATION OF INDIA LIMITED(GOVERNMENT OF INDIA UNDERTAKING)
(TROMISNIT)TELEGRAMS: FERTILIZER Marvai, Chembur.PHONE: SW'*03 24M3 A 0 UK BOMBAY 400 074,
Our Ref. ____ _.RA_ PROCT MNAGER (E I LT_._ y ted the 9
VAR i MR. E. T""fNMUUM IUMST5RIAL PROX"iS W-PARTMENT
ArAINST YGIUR CREDIT 40a D&-40 AND MUR OEQURY PUFAVMU FOR PIPES AND FMTINGS
WE AVE AIR MAILED ALL THE ECESSARY DOCUMENTS ON 91 FOR YOUR APPROVAL Of
opEmmN or LETTER OF CREDIT (.) SINCE THE DELIVERY Of THESE PIPES AND FITTINGS IS
VERY CRITICAL FOR OUR PROXCT SCHEDULE, Y1U ARE REUESTED TO SEW YMAPPROVAL
FOR OPENIG Of LETTER OF CREDIT BY TELX (.) MTTER noS U G .)
PXW102tMOftel-9th 3w.( 76
C.. By Air Rai too-
Ps. International Bank flbr Reconstruction.. S. R.pWt* I3I ,i -
1818 H, Str.e, N*W.,
L BA
THE FERTILIZER CORPORATION OF INDIA LIMITED(GOVERNMENT OF INbtA UNDERTAKING)
YUNIT)TELEGRAMS FERTILIZER MarvaI, Chembur.
PHONE 521451 - BOMBAY 400 074,
TLX NOOSW423A ISAD Uf
Our Ref. No._ _ ___ Bombay, Dated t ( 9 2rRONS mGENML 1*3ET met a EatxN.) r~c.a. mm~y()FOR FIR.E. TORTORELL, INDUMrIAL PROEctS OEPAaREWr(AGAIT WUR COJT Wtj NP OM EN ftPpy n PmsAND rrTTcs wE HAVE AIR MAIL Mi ?/]/96 ALL THE NECESSARY 000MXSire FMYOMR APPMV*L 1fOR aPENiEc or LiTin or CmmiTs(.
SINCE TIE DE.IVERY Of THESE PIPES ANb FMTTIES IS VERY CRrTICAL FO PROJCTSCW-OUE J Y AUS RE UESTED TOD P M APPIU A FO OPENINC Or LETTER
Or CREDITAT AN EARLIEST PREFUALY BY TELEX (.)Y" EARLY ACTION IN HE ATtf WILL 1 HIGHLY AppRZtLTcq (,)
MTTLR MOST t b (RE )
cainim copy To By Agv ftls
Ulm No ita.
a-Am 13o Gar~edi.)Dy. Materials Manager(Expn.)-
TH. FERTILIZER CORPORATION OF INDIA(GOVERNMENT OF INDIA UNDERTAKING)
(TROMBAY UNIT)TELEGRAMS* 'FERTILIZER Marva i, Chernber,
PHONE: 52 45 I BOMBAY 400 071,
Our Ref. No. PXZ/r-/10192 Bombay, Dated the 9th anuar v9 7
/s. International Bank for Reconstructionand Development,1818 H, Street, N.W.,Washington D.C. 20433,US.AL
Attn:- Mr. E. Tortorelli,Industrial Projects Department.
Sub :- Our enquiry No. PXZ/Vj/10192 forpipes and fittings and your CreditNo, IN-461 Trombay-IV Expansion,
Dear Sir,
We are enclosing herewith all the necessary documents requir;E by yo
for approval of opening of Letter of Credit.
I) Copy of each of eollowing orders.
Order No.- par~z Value
1) PXZ/M/10192 M/s. Trouvay &Cauvin FF 30,208.29=
2) PXZ/V/10284 M/s. Chemetron Ltd. E 895.31=
3) PXZ/M/10285 M/s. Mitsui & Co. Ltd. : 1,154300=
2) Comparative statement alongwith committees recommendation.
3) Format 384.
0d Since all the parties have not quoted for all the items indented by
we are not in a possition to fill up the item No. 11 of the format 384. Thi5is clear from the comparative statement.
Since the'delivery of these pipes and fittings m is very critical
to our Project Schedule, you are requested to send your approval for opening
of Letter of Credit against these orders at an earliest preferably by return
telex.
Your early action in the matter will be highly appreciated. Matter
most urgent.
Thanking you.
Yours faitiifully,
(S.C. DE BAKSI)GENERAL Pr3CCTS E
TZ FERTILIZER CORPORATION OF INDIA LMvW'I0(GOVERNMENT OF INDIA UNDERTAKING)
(TROMSAY UNIT)
TELEGRAMS FERTILIZER Marvah. Chembur.
PHONE :5 2i4s BOMBAY 400 074.
Our Ref. No. _K/12/1101 Bombay, Dated the 6 I CJ
M/s. International Bank forReconstruction & Developm.1t,1818 H.Strect,N.W. Washington,D.C. 28433,U.S.A.
Attn. Mr. E. Tortorelli,Ie11.t Zia-@ Lrietst D-,.tJ.
Sub. : Our tender rX/12/10135and Loan No. IJ-M+.
Dear Sirs,
Against subject tender we are enclosing
following for your information and record.
1. NIT
2. Committee's recommendation.
3. Format 381+.
4. 2 copies of rurchase Order.
Thanking you,
Yours a t 2 l1y,
Dy. Materials Manager (Expn.)
Lncls : As above.
Crig t
-Section
T7F PERTILIZER CORPORATIGN OF INDIA LLM'(GOVERNMENT OF INDiA UNDERTAKING)
(TROMBAY UNIT) Marval Chembir.
TELEGRAMS: - FERTILiZER BOMBAf 400 074
PHONE -5 4 i 4 5 1 174
Ore o L OBombay, Dated theLOur Ref. No.fkE_2_13
M/s. International Bark ::orReconstruction & Devclopoent,1818 E.Street,N.W. Washington ,D.C. 281+33,U.S.A.
Attn. Mr. E. ortorelli,Industrifl Fro ject Dept.
Sub. : Our tender i-'XiK/12/10136and Cre dit No. 11-481.
Dear Sirs, tender
Against our subjectZwe are enclosing hIll-Z&
for your information and record.
1. NIT
2. Comparative Statemaent
3. Bid selection
4t. Formiat 384
5. 2 order coities
Thanking you,
Yours faithfully,
'CQ3 . Garcdia)Dy. Materi.ls Manaer (Zpa.)
THE FERTILIZER CORPORATiON OF INDIA Li J-(GOVERNMENT O INDIA UNDERTAKING)
(TROMBAY UNIT)
TELEGRAMS: FERTILIZER MAy 4he n74r
PHONE: 51245J BOMBAY 400074
Our Ref. No. EZZ/_13/L145 Bombay, Dated the 8th .anuary19 7,
f1-/s. International Bank for Reconstructionand Development,1818 H, Street, N..1Washington D.C. 20433,
AtNtn:- Mr. E. Tortorelli,Industrial Projects Department.
Sub :- Our enquiry No. PXZ/13/10145 for Valves
and your Credit No. IN-481,Trombay-IV
Dear Sir,
We are enclosing herewith following papers for your consideration
and approval of opening of Letter of Credit.
1) 2 Copies of our order No. PXZ/13/10145 on M/s. Armaturen Ring
Valued at DIN 2,61,634.00=.
2) Comparative Statement alongwith committees recommmendation.
3) Format 384,
Since all the parties have not quoted for all the items indented by ut
we are not in a possition to fill up item No. 11 of your format 384.
This is clear from the comparative statement.
4) Bid documents.
5) List of qutalified suppliers.
The delivery of thise valves are very critical for our project
Schedule and party has requested to open the letter of credit by
12/1/76. You are requested to send your approval fcr opcning the
letter of credit at an earliest preferably by telex. Your early
action in the matter will be highly appreciated. Matter most urgent.
Thanking you.
Yours faithfully,
S.C. D EakziGENERAL PRODECT f-,iAAGER
Jnuary 7, 1976
Yr. . C. DO BaksiChief 44ginomr (ap.THE M~TILIZ 4t CMPMHATIN OF IDA LTD,Boabay, INDIA
Dear IV. Be bakais
Ret Tronbay ia-4n IVcredit H.O. W31--MN
This is to acknovledge receipt of and thazk you foryour letter of Devaber 8, 1975, enclosin your amnthly ProgressReport No. 18 f or the ==Unt of Novembser 1975.
','e,4 yours,
Ca F. DwweyGbieSft f vise1 II
Industral Pro tz Dpartasnt
cc-. Messrs. artoreM, -hztt, Lietard
JM-9nainii ha
N.N.. 27(3-70)
INTERNATNAL DEVELOPMENT INTERNATIONAL IRANK MR INTERNATIONAL FINA4CEASSOCIATION RECONSTRUCTION ANDDEVELOPMENT CORPORAT10N
OUTGOING WIRE
To. FERTILIZER CORPORATION OF INDIA LTD. DATE JANUARY 6, 1976TROMBAY UNITBOMBAY CLASS OF TELEX: 1-13027
SERVICE x.65ExV. 6998
COUNTRY: INDIA
TEXT: FOR DEBAKSI.Cable No.-
THANK YOU FORYRLET DECEMBER 26. I WILL NOT BE IN A POSITION TO TRAVEL
TO EUROPE WITH YOU AT THE END OF JANUARY, IN VIEW OF PREVIOUS C010ITMENTS.
PLEASE LET ME KNOW IF I CAN BE OF ANY ASSISTANCE IN SOME OTHER WAY.
BEST REGARDS
TORTORELT T
NOT TO 31 TRAMISWTED
AUTHORIZED BY DISTRIBUTION
iessr~s. DeweyNAME E 0 Tortomfl i
DEPT. Industrial Projects Department
SIGNATURE OF INDIVIDUAL AUTHORIZED TO APPROVE)WIFERENCE: For Use !ons Section
ORIGINAL (File Copy)(IMPORTANT: See Secretaries Guide for preparlng fnn) Checked for Dispatcd
THE FERTILIZER CORPORATION OF INDIA LIMITfD(GOVERNMENT OF INDIA UNDERTAKING)
(TROMBAY EXPANSION)
Telegrams: 9FERTILIZUR' OMB - 74. (AS)
BOMBAY- 74. SC. D Baksi Phon : 522267521451\ General Project Manager
Our Ref. No. Exp.() 5thJanuary, 9 76
Dear Mr. Tortorellip
Trombay IV - Expansion
MntlyPmr greMs _ E! No. 19
I am enclosing herewifh the Monthly Progress Report No.19.
The report includes all the annexures.
With regards,
Yours sincerely,
(S.C. De Baksi)
Mr. E. TortorelliInternational bevelopment AssociationIndustrial Project Department1818 H. Street N.0Washington D.C. 20433
Encls as above.
FACT CN -
FACT ENGINEERING AND DESIGN ORGANISAT 1 ON(A Division of THE FERTILISERS AND CHEMICALS TRAVANCORE LIMITED)
UDY OGAMANVIA. COH I N
1,1r. E. Tort orcIli,Lndutrial Projccts Dcpartm nt,Internationil Bank for Heconstruction and
DevIopment,131S, H. street, N1W,W/ahington D.C. 20433. USA.
Sub: Fortiliscr Corporation of India, TmbayProject - 1DA Cr.?o.481 - IN(PCF)
--------------------------
Dear Sir,
We are enclosinf har-with copy of our purch:c. O rJo.3002/7028-10/TR.14 for S0 .s Anlyscr plAccd onM/s. Hartmann & Braun AG, W.ermany. Plese icknowl-d-ire eipt.
Very truy y our,for T1E FRTIL-Ls': 1 '::: c:EzIC-
T AVAPOOI2 LLi2EFT ENGG. AYD -1S r CIL'-
Encl: as above. 6MangeIThri ase c p
V.
-et ri '
S. C. DE BAKSI The Fertilizer Corporation of India Ltd.General Project Manager Trombay Expansion
Bombay-400074.
No. Expn/1(59)/C/75/ 26th December, 1975.
Dear Mr. Tortorelli,
Sub:- Time Schedule for Trombay-IV
I have earlier informed you that the completion of Trombay-IV has got
shifted from 1-6-1977 to 1-11-1977. On our scrutiny we find that it
will be possible to improve upon this, in case we are able to get deliveries
of plant and equipment advanced from 2 to 1 month.( a detailed report is
enclosed herewith). On our investigation of the items listed in this
enclosure we are certain, in case deliveries of Absorver 001 and C02
are advanced, as required by us by 2 to 1 month, completion date of the
plant is going to improve by 2 months i.e. plant will be ready by 1-9-1977
instead of 1-11-1977.
On finding this, we took up with M/s. BSL, who are the fabricators of TerAl"(AbsorptionoCO1 and 002. M/s. BSL have indicated that they will be ableto advance the deliveries provided certain relaxation in the radiographic
requirement of welds is given and an additional payment is also agreed upon.
In total M/s.BSL is asking for 360,000 FF i.e. 3% increase in the total
purchase value (as can be seen from the telex of M/s.BSL enclosed).
We are discussion the possibility of reduction in the rediographic
requirement with M/s.Davy Powergas. On a preliminary investigation it
is found that it might be possible to give relaxation in radiographicrequirement to some extent if not cent percent, as requested by M/s.BSL.
Since this is a very crucial matter, I have arranged a visit to M/s.DPGon 12th January, 1976 and M/s. BSL, Paris on 15th January, 1976. Beforewe take a decision on the relaxation of radiographic requirement, we wantto have a detailed discussion with M/s. DPG in Koln during my stay beforeI meet M/s.BSL people in Paris along with the representative of K/s. DPG.
Under these circ=4 anse, I think it will be better if you are able tocome to Europe during :tis-pekzdd so'that you may also exert your influencefor the improvement -of the delivery on M/s. BSL during this negotiation.
.... .. 2
I am also planning to visit M/s. Steinmuiler and M/s. GH with wh wshave also taken up for the improvement of the deliveries.
During my stay in ELirope I am also visiting Italian fabricators, whohave got substantial orders for Nitrophosphate Plant in order to ensurethat they do not slip from their promised delivery dates.
I sball be grateful for an affirmative reply from your end.
Wish you a Merry Christmas and happy Now Year.
With kind regards,
Yours Sincerely,
Encl. Detained report.BSL's Telex dt. 23/12/75 S.C. De BaksiItinerary
Mr. E. Tortorelli,Industrial Projects Department,International Bank for Reconstruction and
Development,1818 H.,Street, N.W.,WASHINGTON D.C. 20433,U.S.A.
Sub: Review of the progress of Trombay IV executionand the plan for advancement of the revisedproject schedule.
1.0 The Trombay TV project was ~launchea or, 1-6-1974 with a schedule of
commercial production starting from 1-6-1977. The various plant commi-
ssioning was scheduled as below
Nitric Acid plant commercial production from 1-12-1976
A.N.P. plant commercial production from 1- 6-1977
Steam Generation plant commissioning 1- 3-1977.
2.0 On review of the actual schedule of equipment delivery for differert
plants it is observed that it may not be possible to meet the above
schedule. Based on the present realistic estimates of the delivery, we
have developed the revised schedule shown in Annexure (Chart). It can be
seen from the chart that the revised dates of completion of different plants
are as under
Guarantee CommercialTest on rodut ion from
Nitric Acid plant 15-9-1977 1-11-1977A.N.P. plant 15-9-1977 1-11-1977Steam Generation plant 15-9-1977 1-11-1977
2.1 After a stabilization run of 1- months from the successful guarantee
test, the commercial production at rated capacity will start from 1-11-1977.This would mean 5 months' delay in the A.N.P. plant, 9- months' delay in
Nitric Acid plant and 6 months? delay for Steam Generation plant from the
original target of 1-6-1977.
3.0 Critical items controlling the project schedule
The following are critical items controlling the project schedule:
(i)- Absorber 001 of Nitric Acid plant(ii)- Absorber 02 of Nitric Acid plant
(iii)- Waste heat boiler of Nitric Acid plant(iv)- Axial Turbo Compressor set of Nitric Acid plant(v)- Boiler of Steam Generation Plant
(vi)- Rock grinding mi1 of A.N.P. plant.
-2-
4.0 Efforts taken to minimise delays
As indicated above the project schedule depends upon the deliveries of
the equipm- t listed above. We arc tiying to impress upon the suppliers
the criticality of our requirements and are tiying to persuade them to
advance the deliveries of these equipments. Optimistically we would attempt
to get the deliveries advanced as shown below
Contra- Revised i AdvancingI ctual date requ- irequested'E date of ested for tby
f.o. b. f.o.b. I-------------- ------------------ --------deve,-
Absorber 00 M/s Bignier Schmid 20-11-76 27-9-76 2 monthsLaurent- (nbH
25 Quai Marcel Boyer,94201 IvrySur Seine, FRACE
Absorber C02 -do- 5-10-76 6-9-76 1 month
Waste Heat Boiler /s Steinmuller GmbH, 20- 7-76 15-5-76 2 months527 Gummers bach 1,Post fach 1949/1960WEST GEM1LNY
Axial Turbo M/s Cutehoffnung 15- 1-76 15-6-76 1 monthCompressor Sot Schette, Sterkrade
Akbiegesslischaft,Post fach 103,WEST GERMANY
Steam Generation M/s BHE 2- 6-77 1-4-77 2 monthsPlant Trichinapally
TAMIL NADUJ
Rock Grinding M/s Mcnally iarat 1 4-10-76 14-9-76 1 monthMill India, Kumar Ehubi
4.1 xpected impact of revised deliveZy dates
4.1.1 In the event we are able to obtain the equipments as per the deliveries
given above, the plants will be ready for stabilization run by 15-7-1977
and the commercial production will start from 1-9-1977. This would result in
reducing the ret delay in achieving commercial production from 5 months to
3 months when compared with the original schedule.
4.1.2 The plant-wise delay in copletion of guarantee test will then be
as follows
Date of Net delay comparedPlet Competion to original schedule
Nitric Acid plant 15-7-1977 7+ months
4..N.P. plant 15-7-1977 1i months
Steam Generation plant 15-7-1977 4 months
5.0 Monitoring and control of progress
We have developed and implement ed an effective system to moniter the actual
progress of e ach project activity so that information is available in
advance regarding the likely bottlenecks so that suitable timely control
measures can be taken to minimise/avoid delays. The de ails of the system
are given below
(i)- Network charts: Detailed network of each plant and off sites
have been prepared for effective follow up of all activities.
Special attention is given to critical activities.
(ii)- Progress assesing: Every month a list of activities due for
completion during the current month are listed and sent to
each area manager for indicating the actual progress. Also
a separate areawise list of activities due for completion in
next month is prepared. This list also indicates the existing
delays in the activities if any. This helps in taking advance
action in order to ensure timely completion of activities and
minimising the delays.
(iii)- Computer Aided Monitoring: All the network have been computerised.
This helps in identifying the delayed activities and their
impact on the project schedule. Based on this, decisions are
taken to save time in subsequent activities in order to meet
the overall project schedule.
(iv)- Project Incentive Scheme: We are also pioposing introduction
of a suitable incentive scheme for better involvement and
motivation of all project staff.
WPALA 911327AJQg op PARIS jrSJPHALA Qli3g27iSL A 27615F
NR 21913
ATTN MR BASK GENERAL PROJECT MANAGER , rCi BOMBAY
Y'^UR I PO PXZ -12- 19Q2QtUY : S1Q 023
1) REFERENCE IS MADE TO YOUR TELEX OF 4 DeC 752 ) THE REDUCTION OF X-RAY REQUIREMENT FROM 1Qo P TO 10 PC OF THE
CIRRjENTIAL ELDS OF THE COOLING COILS IS A MAJORELEMENT IN THE ACCOMPLISliMENT OF THF A,'(trrPAT-) n1L IEL1
tD HA NO INFLUENCE W1AThOEVER ON THE ThCHNICAL QUALITY uM IHLCOLUMNS#
2) POINT 262 OF OUR TELEX MEANS THAT THE TOTAL COST OF ACCELERATIONDUE TO OVERTIME, INCREASED MANPOWER AND CONSIDULRABLEADDITIONAL TOuLINU IS FF 36V QUO FOR, BOAT COLUMN
LE 15 j00 IN ADDITIONAL PAYMENT21Q QQQ AS CREDIT OF X-RAY REDUCTION
TOTAL I 36Q QQ
4) VC HAVE TAKF0 GOOD NOTr nF Y'" ERY TO i a(* 14 jiTELEX
5) SINCE THE CONTErTS OF YOUR TELEX ARE "n"P7A1 mITR DICTORf,(I.E. GO AHEAD Wl IH THE ACCELERATION ON TIW. ONE HAND ANDDON'T 00 TO 1Q PC X-RAY ON THE O1HER)E ARE SOMEWAT IN A GUANDRY AS TO MAl TO 00.
4) AS A SPECIAL EFFORT TO MEET YOUR REQUEST E ARE PROCEEDINGAT THE MOMENT WITH AS FLEXIBLE A METHOD AS POSSiKei TO AWAITYOUR ARRIVAL ON 15 JAN 76# WHICH IS THE OUTSIDE LIMIT ON WHICH-VE MUST HAVE YOUR CMIITTMENT FOR1) REDUCTION OF X-RAYS AS NOTED ABOVE PLUS2) ADDITIONAL AMOIINT OF FF 7.V C
7) IF BY 15 JAN 76 W EITHER DONT HAVE YOUR TELE)ED OR WITTENCOjITMENT TO THAT EFFECT OR YOUR VISIT IN WHICH TO DISCUSSTHIS MATTER. E WILL BE FORCED TO 00 AHEAD WITH THE PROGRAMFOLLOWING OUR BASIC CONTRACTUAL UATES oF 6 OCT 76 AND29 NOV 76 FOR 0Q2 AND C91 RESPECT IVELLY
8) RE YOUR MESsAX No 128 DATED 18/22-12.75 K OOPVIRM MEETING INBM. ON 15 AND 16 JAN 76.
REGARDS
0PAL /KIN*/ L
SUPHALA 9113Q27
LZL& & U
g an
saw s494aam 8 1. Iss ome 4 Vaa Esea a su JwmrntaG
VA. G a asena m asss
m - A A ara N 19Sb Av
left um a8*aw a a
tilsaatnan VAg. wz aiacz amm e a .ame m iyn 19 ammasqs.
VAAR14. -Mi ma Nm aaa Ue -ma.crum 3GWIa aEj. I.W1n 1ir 1s & bnss am.wr N Vma bse.
-~ naaa a s a --ii- a as -maGtar a lo v
.Aan= V/ = a*RM& %amy & --- aamaea
DDR~us 44.als -.- N ar -amn.naammer~~24 &ms n2na &=saw m amB"W* 4 *MAW
NA ^=we,2ft ANt~
THE FERTILIZER CORPORATION OF INDIA LIMITED(GOVERNMENT OF INDIA UNDERTAKING)
(TROMBAY UNIT)TELEGRAMS IER'IMER' Marvall, Chembur,PHONE; 12 1451 BOMBAY 400 074.
Our Ref. No. PXT/1 6/1 r Bombay, Dated thet 1975
M/s. International Bank forReconstruction & Development,1818 H. Street,N.W. Washington, D.C. 28433,U.S.A.
Attn:- Mr. E. Torterelli.
Industrial Project Dept.
Sub :- Our tender Pg 1./10070 and credit No. IN 481
Dear Sirs,
Further to our letter dt. 30/9/75. We are enclosing herewith 2 copies
of our purchase order PX/16/10070 for pneumatic transport system on M/s. Menally
Bhatat India for your favour of information & record.
Thanking you.
Yours faithfu y,
(3.p. cAnODIA)DY. MATEIIALS MANAGER (EXPN.)
c, EC 10A
CABLE, FED0TELEX; FACT - CN - 264
FACT ENGINEERING AND DESIGN ORGANISATION(A Division of THE FERTILISERS AND CHEMICALS, TRAVANCORE LIMITED)
UDYOGAMANDALV iA. C OC H IN
Ref:.............................. D ate.......... ......... .
r.E. Tor rllIndustrial ?rojcects Dcprtment,ILnternational1 Danli for ReLcon~struction
& Devclopmnt ,31s1 :. Stree t, ITW.Washinmton DC 20453 USA .
Sub: Perilis(&r Corporation of india TrombiyPrcjcot - 1% Cr.No.481-IT(CIP)
Dear Sir,
/c- are enclosing hercwith copies of followir _
purchase ordcrs:-
1. 7002/7026-10 dt. 1.12.752. 3002/7027-10 at. 6.12.753. .002/7029-10 dt. 9.12.754. 5002/7030-10 dt. 6.12.75.
Vary trTU1y y a,for rT7E FERTIMIhE 7 2ND C.
TRAVAYC0rE LIC2T7ACT ENG G. & DEciGT CEG,_,I2A-
L- an g e r Ptr c h a e &, n sc cin.Encl: a.- above.
briginal tODate: commucations
AN 2 Section
THE FERTILIZER CORPORATION OF INDIA LIMITED(GOVERNMENT OF INDIA UNDERTAKING)
(TRO#4BAY UNIT)TELEGRAMS: , FERTILIZER Marvali, Chembur.PHONE: 521451 BOMBAY 400 074,
Our Ref. No. PXT/ 4 2/l0 2 4 2 . Bombay, Dated the 18th Dec. 19 75.
M/s. International Bank for Reconstructionand Development,
Industrial Projects Department,1818 H. Street,N.W. 20433,U.S.A.
(Attn. Mr.E. Tortorelli)
Dear Sir,
Sub : Purchase order for 11KV Switchgear forTrombay IV(Expn.)Project(NO.481IN).
Kindly refer to our letter of even reference dated1-11-75. We thank you for your prompt reply giving approval toour recommendations vide your L.T. Cable dated 12-11-75.
We have released the orders for 11000 volts switchboardsand110OO volts isolator panels in favour of M/s. Jyoti Ltd.Baroda(India) and M/s. NGEF Ltd., Bombay(India) respectivelyIa copy of both the orders is enclosed herewith for your kindinformation and record. The value of order in case of M/s.jyotiLtd., is slightly increased by R-. 2,425/- due to changes inthe outgoing transformer feeders D1 and D2 in the Steam GenerationPlant Switchgear. Kindly refer to item No. 5 and 6 of annexureI(B) of the purchase order. The quantity of DI feeder is changedfrom 5 to 4 Nos. and D2 feeder from 4 to 5 Nos. on the basis ofour actual requirement and as approved by our consultants;M/s. Tata consulting Engineers, Bombay. This changes thevalue of Steam Generation plant board from Rs,16,29,B1o.oO to16,32,235.00 and value of the total order to Rs.40,01,766.OO fromRs.39,99,341.00 as earlier intimated to you. This value isinclusive of the spare parts ordered on M/s. Jyoti Ltd.for a value of Rs.69,181. 00 only.
Kindly acknowledge,
Thanking you,
Ylrs faithfully,
DY(B.P. GAROIA)DY. MATERIALS MANTAGER(EXPN.)
THE FERTILIZER CORPORATION Qf IN" LIITE(GOVERNMENT OF INDIA UNDERT K G)
(TROMBAY EXPANSION)Telegram3: 'FERTILIZER' BOMBAY -74. (AS)
BOMBAY - 74. S# C. D ai n o : 522267521451
General Project Manager 4Our Ref. No. Eixpn. 1(59)B/75 ,3 9- 6( ' 8th cb 1975
Dear Mr. Tortorelli,
Trombay IV - Expansion
Motl .rqesRpr o18
I amW enclosing herewith he tnthly Progress Report No.18.The report includes all the annexures.
With regards,
Yours sincerely,
(S.C. De Baksi)
Mr. E. lbrtorelli,International Development Associ ationIndustri al Projett Department1818 H.Street N.WWashingtoW DC 20433
Encls As above.
INTERNATIONAL DEVELOPMENT INTERNATIONAL BANK FOR NTNATIONAL FINANCEASSOCIATION RECONSTRUCTION AN DEVELOPMENT CO100ATON
OUTGOING WIRE
TO: FACT DATE DECEMBER 4 1975
UDYOGAMANDAL CLS OF ggSb64SERVICE
COUNTRY: INDIA
TEXT: FOR RAMANUJAM. RE COCHIN POIP.Cable No.:
NO OBJECTION TO BIDDING DOCUMENTS FOR POIP AND PROCUREMENT PROCEDURE
SUGGESTED.
NOT TO BE TRANSM ITID
AUTHORIZED BY- CLEARANCE AND COPY DISTRISWIO&t
M ct Messrs DeweyY. T. Shetty Perram, Brown, Carpio
DEPTEspiritu (Ms)Industrial Projects Department Robbin ( M) - F510
SIGNATUR_ Hamilton (Ms) - c514SIGNATURE OF INDVIDUAL AUTHORIZED TO APPROVE)
REFERENCE. YTShetty/om - IDIA - Coobin-POIP F We By Soc4Io
ORIGINAL (File Copy)CWAPORTANT: Sao Secretaries GuM for preparing form) Chcked for Dispetd
Form Na.27
INTERNATIONAL DEVELOPMENT INTERNATIONAL BANK FOR INTERNATIONAL FINANCEASOCIATION E C ANDDEVELOPMENT WRPORATION
OUTGOING WIRE
TO: FERT. CORP. OF INDIA LTD. DATE. December h, 1975TROMBAY UNITBOMBAY CLASS OF
SERVICEn TELEX: 113027
COUNTRY: INDIA
TEXT:
Cable No.; FOR SC DE BAKSI AND BFGARODIA RE IDA CREDIT 481-IN
RE YOUR MESSAGES AAA NUMBER 194 APPROVAL OF AMENDMENT FOR APPLICATION
Q-19-1-1 ISSUED NOVEMBER 26 STOP BBB NUMBER 195 RE PXT/42/10151 WE
HAVE NO OBJECTION TO INCLUSION OF VOLTAS IN TENDER FOR RELAY AND
CONTROL PANEL ALTHOUGH AS PER IDA PROCUREMENT PROCEDURE APPROVAL
NOT REQUIRED DUE TO SMALL AMOUNT INVOLVED STOP CCC NUMBER 199
AGREEMENT TO REIMBURSE ISSUED DECEMBER 1 FOR APPLICATIONS 60, 61,
62, 63 and 66 STOP APPLICATIONS 6 AND 65 CANNOT BE LOCATED OR NOT
RECEIVED,1I1 JXRM1X MM XMMM REGARDS
SHETTY
NOT TO BE TRANSMI IiED
AUTHORIZED BY: CUARANES AND COPY DISTRIOe: Messrs. Dewey Ms. Robbin (F51o)
NMY. T. SHETTY Perram Hamilton(C514)
DEPT. Industrial Projects Shetty Espiritu
SIGNATURE(SIGNATURE OF INDIVIDUAL AUTHOmIZED TO APPROVE)
REFERENCE: 0( efREEEC: TROMBAY IV FEspiritu :tqr For Us By Comu~atmScto
ORIGINAL (File Copy)(IMPORTANT: See Secretaries Guide for preparng form) dadr DiNpad
December 2, 1975Mr. J. S. BaijalJoint SecretaryMinistry of FinanceDepartment of Economic AffairsNew DelhiIndia
Dear Jagdish:
As you probably recall,. Mr. Diamond wrote to Secretary Kaulon March 11, 197W, expressing our concern with the sititation and pros-pects of FACT in general and the IDA-financed Cochin 11 project Inparticular. Secretary Kaul replied on Hay 27, pointing out that somesteps recoimended by the January supervision mission had been takenand others were under consideration.
Since them, a mission visited India in October to tupervisethe Cochin Fertilizer Project (Credit 264-IN) and FACT's portion ofthe Plant Operations Improvement Program (part of Credit 481-IN).Unfortunately, we find that many of the problems mentioned in l4r. Diamond'aMarch letter remain, and some new ones have been identified. -
The schedule for completion of the Cochin II project continuesto slip. The plant is now expected to be conrdssioned in July 1976,28 months later than estimated at the time of appraisal. oreover, workon the canal, which is of crucial importance to the transportation ofimported raw materials from Cochin port to the plant site, seuias tohave made very little progress since January. These matters and othersrelating specifically to Cochin II are discussed in somewhat greaterdetail in the attached sumary of the supervision mission's findings.
Several findings relate fo the continuing management, technicaland financial problems of FACT in general, and the slow pace of progressunder FACT's portion of the Plant Operations Inprovenent Program. We arepleased that FACT is in the process of appointing a Finance Director anda Technical Director. As capacity utilization increases in Cochin I andas Cochin II comes on stream, we feel that a Ilarketing Director shouldalso be appointed to cope with the expansion of the Coripany's marketiigand distribution activities. Wo aloo foel that Ar. Khaum.na is ovcrbur'r edwith his dual responsibilities as Chairman and -anain Director. Thtra-fore, we suggest that &nsidration be 4vcn to appointment of an ecced
/2 .
1.
Mr. J. S. Baijal - 2 December 2, 1975
executive as Managing Director and to separation of his duties from thoseof the Chairman. Such measures could facilitate the development of atop-level team to support the Chairman, and permit the needed delegationof responsibilities. Another problem ariSes from the fact that dany seniorpersonnel are leaving the Company and replacements for them are not beingmade promptly.
Mr. Diamond suggested in his letter to Mr. Kaul that the Govern-ment should exercise a stronger and idre active role through the Bqard ofDirectors. He also recomnended that the FACT Engineering and DavelopmentOrganization (FEDO) be strengthened by merging it with the Planning andDevelopment Department of the Fertilizer Corporation of India. We aredisappointed to find that little progress has been made in this direction,
We want to draw your attention again to the severe problem ofdebt sprvice being experienced by the Company. We urge the Government totake effective measures to rectify this situation, preferably by grantinga moratorium on debt service for three years (1976-1973) and reschedulingdebt service at least over the next five years.
Because of our deep and continuing interest in the fertilizersector in nd&a, -- Lich I know you share, us urge you to monitor this situationclosely and to see to it that urgent action is taken along the lines recomnendedby the supervision mission in the attached summary. During their recent visitsto Washington, Mr. Khanna and. Mr. V.11. Rajagopalan indicated that measures toimprove FACT's financial and managerial situation were expected to be taken byFebruary 1976. We look forward to hearing from you with an indication ofprogress toward the solution of FACT's problems.
With warm personal regards,
Yours sincerely,
Bilsel Alisbah -
c Messrs. Venkataramanan, Dewey, Singh
AOlamilton:nf
DC .ie 1, 17a
THE F-PT.IZ M CmMRTN OF IDIA LTD.-Douky, India
rear fr. De U.ai s
Ret Troqab rans TVCrodit No. 4ft-InD
This 1* to acknwwd reasipt of =%d tkz y forycmr letter of Navaaber 1&, 1975, enclos your 1.nthly ProgrpesReprt No. 17 for the month of October 19 .
ch.uncey F. DeweyChief of Division III
Tndnatrial Projft+. Dpmrtunent
cc: M*ers . Tortorelli, Shetty, Lietard
JW~oncinit ha
THE FERTILIZER CORPORATION OF INDIA LIMITED(GOVERNMENT OF INDIA UNDERTAKING)
(TROMBAY UNIT)TILERAMS FETIUZR' .~ ~ Mat-vali. Chemnbur,
PHONE: 5214 51 BOMBAY 400 074.
Our Ref. No. Bombay, Dated the 9
NO.248423A DT L w
ROK S DR. DBAM-1 (W1 PRTILISTv A M Xagg pAggFOR MRS. .STOR LLINDJORUL PWAST0D14RV T
RBRN
RrSFa-anCX YOUR LT CJAsk DATXD 27.-31.-7.S(.OU R APPL=ATZ0W NO.06-1-1 FRo BIM MUTw MUMsMATR WAs
SJWT BY 73MAMCI KUAvUWaa ON T xgg"4~24 OTHER APPLICATIONS VJXBBJUMO 40-1-1 TO "4-1..1 .A0=01JS TO WOW smiaNE You HAVZ RECUvE TMB OEn=Rg
IAGPWAlln s mzsR -74 (.) 2M 1 (4
Cn in orna byPt *~W 2 ~~t ** "-
Xr~x*TortA11u
THE FERTILIZER CORPORATION OF INDIA LTD.95ZI.1:T *i10 ;f o GT ftZI 910
DURGAPUR UNIT BY AIR MAIL
Regd. & Head Office : Please reply to:
F-43, South Extn. Area, Part 1. Ring Road DURGW U 73212
NEW DELHI-49 Wrst :eTGram : Fertilizer 69Gram: DURFERT
Phone 62-6221 (3 lires TELEX : 020-205
REF. NO. A94E/S-3/75/ DATED, THE 2$.l1.75.
Mr. E. TortoreilliInternational Development Association,1818 H. Street, N. W.Washington, D. C. 20433U.S.A.
Dear Sir,
To float enquiiry for procurement of Primary Reformer
tubes and outlet pigtails we didn't get any approved list of
Supplie-r from Trombay Expansion or Sindri Modernisation Projects.
From our experience we have made a list of Suppliers
which is encl)sed herewith for your kind perusal and approval
please.
Thanking you,
Yours faithfully,for and on behalf of
The Fertilizer Corporation of India Ltd.Durgapur Unit.
Encl: as aboe.
( A.K.Mitra )General Manager.
THE FERTILIZER CORPORATION OF INDIA LIMITED(GOVERNMENT OF INDIA UNDERTAKING)
(TROMBAY UNIT)TELEGRAMS : FERTILzER' Marvali. Chembur,PHONE: 51 451 BOMBAY 400 074.
Our Ref. No. Bombay, Dated theZ9
Ni 24m23 A
WM 4 S.C. US AAXZ WX "-. MANSO
FOR KIR X TMORR~I-I ZULUWSTRANL PRWNCT EINAMT
38AR
ZDA CR ? RO .481-N, OQPa .09-a-lMD G5ALT1n ARUMNT TO RIRSZ X0.8 A 1 9.5.75 )GDVMWMRNMT HAS FMRWARDID To IDA On 11H INSTANT
WPLICATICH FORAPPRWAL OF AMWUDIT DKTXD 92K mC=DZR1975 To WC No.mAV j/7S/9 liCRAnG vAWl DY US 440o
AND IxT2DP VALIDZTY WUTO 1051 D2CEIbUR 1975 (.) XAPPWRV D SeT .4 j
- %RXAI (.)
"Idur.iE. P0trojctopatmt
Vs.ag % ai r c ea et
I.T.T. ~ o
Pe.W14v Le?
THE FERTILIZER CORPORATION -OF INDIA LTD.
DURGAPUR UNIT
Regd. & Head Office: nPlease reply to:Regd.& Hed Ofce :DURGAPUR-713212
F-43, South Extn. Area, Part 1. Ring Road West BengalNEW DELHI-49 Gram: DURFERTGram: Fertilizer Tram :URFERT
Phone : 62-6221 ( 3 lines )
REF. NO. DP*VM 8:7105 DATED,THE . _-. ----
The International Development Association1818, H. StreetM.N. Washington, D.C. 20433U. S. A.
Dear Sirs,Sub: Modification of Durgapur Fertilizer Plants
Mnder World Bank Fingnaing Scheme T.Q.I.P.
We are enclos'ing hereWith a copy of our Tender No.DP:M:EES:7105dated 26.11.75 together with suppliers list issued by us for procurementof Reformer Tube and Outlet Pigtail under World Bank Loan (POI). Theestimated value of the individual enquiry exceeds US $ 50,000/-
This is for your information and approval please.
Thanking you,
Yours faithfully,for and on behalf of
THE FERTILIMR CORPORATION OF INDIA LIMITEDDURGAPUR DIVISION
VASSTT. MARIALS MANAGER (JXUrHAS)Lnel: As abcve
cc: Ain*J Adviser (Fertiliser)Ministry of P & CShastri Bhavan, N/Delhi .. alongwith the set of enquiry letter
cc: OSD (Projects)FCI Ltd., N/Delhi .. -do-
cc: Conmercial ManagerFCI Ltd., N/Delhi -do-
THE FERTILIZER CORPORATION OF INDIA LIMITED(GOVERNMENT OF INDIA UNDERTAKING)
(TROMBAY UNIT)TELEGRAMS: , FERTILIZER Marvali, Chembwr.PHONE 52145I BOMBAY 400 074,
Our Ref. No._ U N A Bombay, Dated the i9
fR MR BP GARIDDIA0 D. UKl (mP)
FM i M& E TRTRELU
OUR EMM PXT/40/0151 (.) AMR UEST OF APMNVED SUPPLIERS DID MDT
11CLUE MESMS VMLTAS IMIA AS TEM MD DT RESM 11 OU R a= A&RnSEvENT(
DW TO LACK OF PARTICIPATION ON EWQU4= PIX 22XP RELAY AND POW PANEL MOR
M POWER RECEIVING STATION NESMS V=AS WAS REQWMD M0 PAR1TICIPATE IN THE
IENDER *J ARE REPUMED NAuRWAcTIRERS Op alELa FQUIvPgEnT III DIA (.) IIESSRS
'40LT S OFFER WAS LO- wWMAHED M0 07HEM AM OR=R IS PRMBOED ON THEM VIX
VALUE Of RUPEES 2,14jW.. (.0 REQMST AffftMg =XrLnen OF mEM VOLA ON
APPwm W PLIERs LisT (.) LETTER oir iurwN Auaw pLACED ON pARTy(.
MESSAGER OVER
PXT/12/10151 Dy.materiasN~f (Expm.)
Confirmation copy by post to t Mr. E . Tortorelli,International Bank f0-r Reconstruction
& Development,'Industrial Project Dept.,1818 H. Streets,N.W. Washington DC 20433
Form No 27(3-70)
INTERNATIONAL DEVELOPMENT INTERNATIONAL BANK FOR INTERNATIONAL FINANCEASSOCIATION RECONSTRUCTIONANDDEVEOPMENT CO-PORATION
OUTGOING WIRE
M FERTILIJER CORPORATION OF INDIA LTD. DATE: November 25, 1975
TROMBXY UNIT aAS OF fiqe!21
SERVICE:
COUNTRY- INDIA
TEXT: FOR DEBAKsi. RE TROMBAy Iv.Cable No.:
REURTX NOVEMBER 22 APPLICATION 66-1-1 FOR BRINK MIST ELIMINATOR NOT
YET RECEIVED STOP AS SOON AS RECEIVED AND FOUND IN ORIER AGREEMENT TO
REIMBURSE WILL BE ISSUED ACCORDINGLY.
'NOT TO BE TRANIMITTED
AUTHORIZED BY: CLEARANCES AND COPY DISTRIBUTION:
cc: Messros DeweyNAME E. Tortorelli Perram, Shetty
Espiritu (Ms)DEPT. Intistrial Projects Department Robbin (Ms) - F510
Hmi ton (Ms) - C514
11111i IN V D -ro APPOVE>PEFERENCE: For Use By Commvnktons Section
ORIGINAL (File Copy)(IMPORTANT: See Secretaries Guide for preparing forn) Chocked for is:
TELEPIION91 COCHIN W
CAGLE: Ir-10030TsLEX, FACT - CN-
FACT ENGINEERING AND DESIGN ORGANISATION(A Division of THE FERTILISERS AND CHEMICALS TRAVANCORE LIMITED)
UDYOGAMANDAV IA. C O C H I N
R. PR/Gen-76/POIP/ IA)LIB IR TrAIL Date. 24 1L. ra~..
The International Bank for ReconAtructiOn
and Development,1813 IT Street, N.W.,WASHINGTON D.C. 20433 (U.S.A.)
Attn: Mr. E. Tortorelli, Industrial Projects Deartmerit
Sub: IDA Loan/Credit under the Plant Operations Improvement
Progranme to FACT for Cochin Phase I and Udyoganandal
Units - Bidding Documents
Ref; Our letter PR/Gen-76/POIP/15539 dated 14th October 1975
Dear Sir,
In view of your cable dated 19th November 1975 infor-ming us
that you have not received our above letter enclosing the bidding
documents for the above, we are enclosing herewith another ciopy
of the letter together with all enclosures mentioned therein.
We shall be grateful if your approval is communicated to us
at the earliest for (a) the bidding documents, and (b) for
adopting the procedure as suggested in our above letter.
Thanking you, we remain,
Very truly yours,THE FETTILISRS AND CHIEICALS TF2AV.LT21
FACT ENGINE FING AND DESIGN CiGN.
MANAGER, E NPECTION
Encl.
P.S. We shall be grateful if IDA approval is communicated
preferably by telex/cable.
sn
to~ co m'n Catio\rgia to!tiufl
INCOMING TELEX mc
RECEIVEf /
Distribution7 (Telex no )
PH5 127U 23U Industrial ProjectsFrom: Bombay - Nov. 2 9 CMMUN1CAT IONS Mr. Aliobah
- -ECT fW-
L T- . 2.
-F -
77T 1 1I
THE FERTILIZER CORPORATION OF INDIA LIMITED(GOVERNMENT OF INDIA UNDERTAKING)
(TROMBAY EXPANSION)
Telegrams: 'FERTILIZER' BOMBAY -74. (AS)BOMBAY-74. Phone: 522267
5 2145 1T 3 E X21ST NOVEMBER 1975
Our Ref. No.-9h 19
NO. 248423 A
FROM I SC D SAKSI GPK TRO"AY FXANSION BOMBAY
FOR a MR E TORTW.ELLZ INDUTRIAL PROJWeTs DWIARTmENT,
INTERNATION#ANK FOR RECONSTRUCTION AND
DEVELOPMENT.
GOVERNENT OP INDIA HAS SENT TO IBRD VIDE LETTER NO.
55(82)ECA(A)/75.12/AA.I1I DATED 4.11.1975, APPLICANION
NO. 66-1-1. THE SRIA, VZIVE OF THIS APPLICATION IS
FOR BRINK MIST 5IMINATORS FOR A VALUR OF BELGZUM FRANCS
2,617*000. PLEASE GIVE YOUR QUAZIED APPROVAL FOR
AGREEJ49MT TO REIMBURSE UNDER CASE VI PROCEDURE FOR THIS
ITEM VIZ. BRINK MIST RLIZN4ATORS WHICR WE UNERSTAND FROM
THE MANUFACTURERS ARE READY FOR SHIPMENT AND ARE AWAITING
M LC a NPIRMATION PROM WORLD 3AMO.
REGARD$.
N T T
(S C Do Bakmi)r Project Manager
Post copy by Air Maib:
Mr E TortorelliIndustrial ProjecZe t4pArt entInternational Bank for Reconstruction
and Development
1818 H, Street, NWWASHINGTON DC 20433 (USA)
-1-O 33 (Iav)13T8 He agr-jU' 1
9;Jg DGGObWGUgITJ4rGL7egIceT BguJC EOL SGGoungfrGc4Tcu
WL E JtgOLem EC
bO2p cob pA VTL gT 4: 7
(2ol CC wwiswae
li-7 %"v AT\C f3lC MAE3EL Iso wgD yytALvTE WYJflLYCtflE VE nE-Z hva AHI1x YMD ) LYoIMe
IL2W AIS* BIM W TBL Zr2wIMVY0m MHiICY MX l 1MDENLY!D LBO4
YC EW EL .LO JEIWanBflE amDEN CYaK AX bWOGED(gE n0H iHIg
S" Q' 000* XPFV2E CIA'E &O1 3nU PID Yb6A\P LOL
105 Bn1mI WT2J ZIrI)T4YON EON V AVrfl 0 BXEPIlnW 1VYMC?
MO* ee-Tu.* 314 3W'IVr NfDE IAN 01 341IE MAbPICY1IO IV
22 (9 3) ECVY)\.IP-TT\V III W19Dg I ey Te 7Tc),12CV"D
COAENKI71,17 1 IRDI. Hl V UI4T L0 eIND AIDP, PZ&L MO
DEAEPObIW2'
IT1NfyIor1SvMx ION F-COF'Nkc7LI0M V14D
LIS t WIS E 3OL0KEPI I-Dfl3JIYr bopECL8 Db yu WEM I
SN-ow 2 C DE BI Cb *W W'IBVo Y XbV'IO4 TBYA
E r E x 3T7?L !OAEHXE1 T3,DOWBWA-\ bpOU' 233
;IcILsWa: AbEI5LlrIEg 8wY,~(
( ANo.MjvA EXbVi4IoM 1)
(COAE90WEl1I OL IMDIV mlDEKnvKIme)LHE LEB1LrIIXEL COBbOBVIOL' Oh IMDIV IV4ILED
ThE FERTILIZER CORPORATION OF INDIA Lu yAD
(GOVERNMENT OF INDIA UNDERTAKING)(TROMBAY UNIT)
TELEGRAMS : FERTILIZE' Marvali. Chembur,
PHONE: 2 4 5 IBOMAY 400 074.
Our Ref. No. PXK/12/10168 Bombay, Dated the i- 197.
M/s. International Bank forReconstruction & Development,1818 H. Street,N.W Washigg#on, D.C. 28433,U . S.A .
Attn:- Mr. E. Tortoalli.Industrial Project Dept.
Sub :- Our tender PXK/12/116_ and credit 0 1
Dear Sirs,
Against our tender referred above, we are enclosing following
for your favour of information and record.
NIT
2) Purchase order copy.
Thanking you.
Yours faithfully,
(B.P. GARODIA)DY. MATERIALS MANAGER (LXPN)
November 23 19T5
The Ferilizer Ca7poaime at 1adisDuragr Uivislmwest Ba]Inda
Dor Si*,
Res , RMSME ETe
This *M '"k"ow"edge reeit at the fallo4g asts ofimpiery peegh for itims to be pvreed for the mkdincatima ofNnura r AMUst
TOM1 Burner for "AsmnIAa r"Oking furva"- Ms5 Autem .tie look off vaitv s76 Gas chramtogrw*h
7004 D*-cmtnpe redurume rewetor7090 Retaiter tramimittor7092 Petentiamtra t"W. reeedr7m95 Temotuv rw aft-e--
We 4ud lil ym to refer to our t2mem of Oetaber I toMr. Gantem, October 21 SM 31 to VCI Orn%1 Manager, D-vv,regarding the reparting estom an Proomrmam fcr POIP. We repeatour iatrmtion that yu ammt mmek our oammmw before paigtheordern whm the quient 9t is 9 We g Further-mire, you not hamm to snd u' eapie fiures o seadges underus$50,000. yeo we requird do ao mar if tm i.dvi*md package I4. xris esu-imte to 00vt U.S5 00o r sava*s We bellowe the Individual costeof the obaws packages are i;_ them M8050.000, and Uhmse Whoreforo do notrequirv ITA's Primr appronao.
For further o a stS ot ths mtter, wur ge you toemunilt your DeUA atfim.
E. TortaralliIndustrial Preoxft Dgatsa
act PCI - DelM.cc: Messrs, Dewey
Perram, ShettyEspiritu(Ms)
FEspiritx/om - INDIA - DWrgapur POIP rombay
THE FERTILIZER CORPORATION OF INDI LI(GOVERNMENT OF INDIA UNDERTAKING)
(TROMBAY EXPANSION)Telegrams: 'FERTILIZSR' B) Y.-74. (AS)
BOMBAY -74. S*C. De Baksi hon 522267
\General Project ManagerOur Ref. No. ExpI1 j(59)B/75 c 1975
Dear Mr. Tortorelli,
Trombay IV - Expansion
Monthly.ProressR Fozt No.17
I am enclosing herewith khe Mbnthly Progress Report No.17. Thefollowing changes/additions have been made from this month's report.
Annexure-I has been split up into Annexure-IA and IB. Annexure-IAshows the critical activities in Progress and Annexure-IB indicates thecritical Activities completed.
Annexure-II shows the detailed project activities of each plantbased on the revised time schedule approved by the boajud (as per originaltime schedule the commercial production was to start from 1.6.1977, therevised schedule date is 1.11.1977).
A brief comments on the delayed activities and their overall impacton the project is shown along with the Main Events of the month.
A review on pending items in material procurement status is givenin Annexure-III.
The revised cost estimates are shown in the summary of FinancialStatus and in Annexure-V.
The following graphs have also been introduceds
i) Project status trend.
ii) Financial Status
iii) Estimated Cbst to completion
iv) Expenditure Trend
With regards,
Yours incerely,
Mr. E. Tortorelli (S.C. Do Baksi)
International Development Association,Industrial Project Department1818 H.Street N.WWashington DC 20433U. S. A
&icls As above.
Cl#/f130 I/1OIT ARAO9ROD 993X1IT933 3HT(DMDAATq3Q0U AIG01 90 TV3MMt3VOD)
a iOIIMAiX3 YA8NOr )
(ZA) K.Y IM-*a *.91:JITAR2 :wel4:
nd 0.Ie8 eC .. 1 .- YA8MO
i J, ) 6 ,k! )
/'egen6M foetozI Lssea
eve P -2 (~Cf _ CT\k01 '1Yqx6 .oM 0" '
noienJqx3 - VI y0dmo3T
eiiT .T7i.ovI ctogi 33a1ipo9 yindM 9d$ diiweiscd pn eoLone me I.oqaesi a'irnot aidi mOil ebsal need svsA enoii fbbs\ 1 cnsd3 pniwoll
AI-xLa~fna .LII bes Ai-extuxenre oini qu iltiqa necjd eati I-.iuxennAeri~ Jabi elu l -sixsnra briE eassoiq iii aesivis i63ii1o sd$ 8WoiS
.b efLqao es1iivli.A isoilli
f cb; 's1 lo ast bvitzs i1eto-iq b )rspb b,- ,woda II-eCuxInrisnlpitzo isq as) ba.sod eid yd bevolqqE eiubedioe mli bee iveii 3fd no 10
erA jVQ1.o.i mox3 hst oi asw noiloubcq I bie;mi edt eLubq,1da emii.( T 9 1.Ie. ci .[,b -bL beda beeve-
fzorqnmi Izissvo xierit bns seeIivitE beysieb od no etinemmo~ 'tehd A.rlino edi 10 einv3 nisM d diw rio s nwoia cl aetoq e;i7 no
ngvfp a! aujtbc isefieoiq I t i h tm am asetl pnibnoq no welvei A.III-suxnnA fl
1isansoP1 to IsITVaed ai nircI 0 ashrni se iao bickvei ediT.V-iruxenak ni bns autst
ibsmuboijfi ne'ed -el svsd adgeir gniwoI1o1 euiT
.baix eufeita fsoiq (I
bneiT exruibnsqx3 (vi
,bise2 diiW
1fl0 S 3OcaA insmqoisveG ienoism a nI
fnem~itgenJ :)qLoi lsiaslubnIWI.Vi 19 svJ?.H 8181
.9 noY, nhiZ W
.evods 8A : ion
THE -FERTILIZER CORPORATION OF INDIA LIMTED(GOVERNMENT OF INDIA UNDERTAKING)
(TROMBAY UNIT)
TELEGRAMS FERTILIZER (.P.Garoda)Marvali, ChembrPHON;5Z451 B.PGaxoia)BOMBAY 400 074.
PHONE:5 2 I 4 5 Dy.Materials Mgr.(Expn.)
Our Ref. No. Purghixpn/W/34 U Bombay. Dated the 1 79
Dear M. Tortorelli,
Subs Trombay IV - Submission of Documents -
Our Order No.PXY/12/10180.
Kindly find enclosed one set of our Purchase Order placed on
M/s. AIOM, Italy, for favour of your information and record.
With best regards,
Yours sincerely,
(B.P. Garodia)
Mr. E. Tortorelli,Industrial Project Department,International Bank for Reconstruction & Development,
1818 H. Street, N.W.,Washington D.C. 20433,U. S. A.
Encss
THE FERTILIZER CORPORATION OF INDIA LIMITED(GOVERNMENT OF iN61A UNDERTAKING)
(TROMBAY UNIT)TELEGRAMS: - FERTILIZER Marvai, Chembur.
PHONE:SZ145 (B.P.Garodia) BOMBAY 400 074Dy.Materials Mgr.(Expn.)
Our Ref. No. Pur/lxpn/WB/34 Bombay. Dated the 12 H - 19
Dear Mr. Tortorel i,
Subs Trombay IV - Submission of Documents -Our Order No.PXY/12/10180.
Kindly find enclosed one set of our Purchase Order placed on
/s. AIMM, Italy, for favour of your information and record.
With best regards,
Yours sincerely,
(B.P. Garodia)
Mr. E. Tortorelli,Industrial Project Department,International Bank for Reconstruction & Development,1818 H. Street, N.W,Washington D.C. 20433,U. S. A.
Encls:
FormNo. 7c(3-70)
INTERNATIONAL DEVELOPMENT INTERNATIONAL BANK FOR INTERNATIONAL FINANCEASSOCIATION RECONSTRUCTtONANDDEVELOPMENT CORPORATION
OUTGOING WIRE
TO: FERTILIZER CORPORATION OF INDIA LTD. DATE: November 12, 1975
TROMBAY UNIT LASS OFT
B AYSERVICE:
COUNTRY: Dii INDIA
TEXT;Cable No.: REYRLET NOVEMBER 1 PXT/42/1O142 POCUREMENT DOCUMENTS REVIEWED AND
HAVE NO OBJECTION TO AWARD 11000 VOLT SWITCHGEAR T JYOTI AND ISOLATOR
PANEL TO NGEF.
REGARDS
TORTORELLI
NOT TO BE TRANSMITTE
AUTHORIZED BY CLEARANCES AND COPY DISTRIBUTIOtNs
cc: Ressrs. DeweyNAME E. TortorelJi Perram, Shetty
DEPT.ESpiritu (Ms)Industrial Projects Department Robbin (Ms) - F530
SIGNATURE E_________ __ Hamilton (Ms) - 0514(SIGNATURE OF INDIVIDUAL AUTHORIZED To APPROVg)
REFERENCEi FEspiritu/omi - INDIA - Trambay Ir Us. By Ca mmunlsps Sebln
ORIGINAL (File Copy)(IMPORTANT: See Secretaries Guid. for preparing form) Chce o ipth
INTERNATIONAL DEVELOPMENT INTERNATIONAL SANK FOR INTERNATIONAL PINANCE
ASSOCIATION RECONSTRUCTION AND DEVELOPMENT CORPORATION
OUTGOING WIRE
TO: DURFERT DA November 12, 1975
DURGAURC TEL: 713212
Ext. 6666COUNTRY;
TEXT;Cable N: FOR GENERAL MANAGER. R
REYRTI NOVEMBER 10 YOUR PROPOSED AWARD OF PIPES NOTED AND WE DO NOT
OBJECT TO PLACE PART ORDER WITH SUMITOMO AND MNXESUM BNG THE
TWO LOWEST BIDDERS.
REGARDS
TORTORELI
NOT TO E TRANSMTTED
AUTHORIZED BY: CLEARANCES AND COPY DISTRIBUTIN:
NAME E. Tortorelli cc: Messrs DeweyPerram, Shetty
DEPT. Industrial Projects Department Espiritu (Ms)
SIGNATURE(SIGNATURE OF INDIVIDUAL AUTHORIZED TO APPROVE)
REFERENCE; FEspiritu/om - INDIA - POIP/Trombay 's' By ovniations Sen
ORIGINAL (File Copy)(IMPORTANT: See Screaries Guide for prpring fon) oed fo D tcht
248423B IBRD UR
RCWl0
AZCZC YWB054 RML6797 GWP527 VIA ITT CNY720 CSI 5/11
URWN CO INCX 251Di s ribution:
DURGAPUR ONE 251/249 10 1825 PAGE 1/50Industrial Pro Ikr. Aliabah
'Nov. 10, 75
MR ETORTORELLI INDEAVAS
WASHINGTONDC1
PROPOSAL FOR PROCUREMENT OF PIEPES UNDER POIP LOAN (NUMBER
IN 481) STOP INQUIRIES WERE ISSUED TO EIGHTEEN FIRMS UNDER
REGISTERED POST FOLLOWING ICB PROCEDURES AS PER APPROVED
SUPPLIER LIST STOP RECEIVED QUOTATIONS FROM FOLLOWING FOUR FIRMS
A THYSSEN DUSSELDORF B MANNESMANN EXPORT DUSSELDORF C SUMITOMO
SHOJI
Ll#[l II 481) B C
KAISHA LTD JAPAN D EXPORT UNION DUSSELDORF
2 OFFER OF M/S THYSSEN DUSSELDORF WAS RECEIVED LATE AND NOT
CONSIDERED STOP 3 M/S SUMITOMOMO SHOJI KAISHA LTD JAPANS
OFFER RECEIVED
IN TIME AND LOWEST WITH REGARD TO SOME OF THE PIPING
ITEMS HENCE PROPOSE TO PLACE PART ORDER ON THEM FOR
VALUE OF RS 0.60 MILLION STOP 4 MESSRS MANNESMANNS
OFFER WAS POSTED FROM GERMANY QUITE AHEAD OF OPENING DATE
STOP IT ALSO REACHED CALCUTTA POST OFFICE AND IN DURGAPUR SUB
POST OFFICE IN TIME AS CLEARLY SEEN FROM CALCUTTA AS WELL
AS DURGAPUR POSTAL SEALS STOP
BUT THIS OFFER WAS
GQt --e-v%-4-
OPENED LATE AS NO REFERENCE NUMBER WAS
INSCRIBED ON THE ENVELOPE STOP OFFER OF MESSRS MANNESMANN IS LOWEST
BY 40/ (BY APPROXIMATELY RS 0.29 MILLION)
IN COMPARISON TO OFFER OF MESSRS EXPORT UNION DUSSELDORF STOP
5 WE CONSIDER M/S MANNESMANNS OFFER IN TIME AND M/S
MANNESMANN BEING REPUTED MANUFACTURER AND
COL~~~~ ~O B POIAEY-R- -t1O)
SUPPLIER WITH LOWEST OFFER WE PROPOSE TO PLACE THE REMAINING
ORDER ON THEM IN PREFERENCE TO EXPORT UNION WHICH IS A SUPPLY
AGENCY STOP 6 SOLICIT YOUR APPROVAL AS THE VALUE OF THE
ORDER PROPOSED ON M/S MANNESMANN IS RS 0.4 MILLION STOP
FCI MANAGEMENT REGARDS
GENERAL MANAGER DURFERT
INTERNATIONAL DEVELOPMENT INTERNATIONAL BANK FOR INTERNATIONAL FINANCEASSOCIATION RECONSTRUCTION ANDDEVEOPMENT CORPORATION
OUTGOING WIRE
TO: E FERTILIZER CRPORATION OF INDIA DATE NOVEMER 4, 1975TROM1BAY UNITBBAY CLASS OF -r. U3T7
SERVICE:
COUNTRY: INDIA
TEXT:Cable No.. ATTE!NTION MATERIALS MANAGER
WE HAVE REVIMEID AND HAVE NO OBJECTION TO AWARD PXT/14AO078 TURBO
GENERATING PLANT TO BBEL. REGARDS
C ~ TORTCRELLI
NOT TO BE TRANIMTED
AUTHORIZED BYs CLEARANCR AND COPY DISTRIBUTION:
cc Messrs. Dewr, Shetty,NAME E. Tortorelli Ms. Robbin, Espiritu
DEPT. Industrial Projects
SIGNATURE(SIGNATURE OF INDIVIDUAL. AUTHORIZED To APPRovv
,REFERENCE: FEspirituiae INDIA - Tromrbay Procuremen for u.e By Com nkfloans Section
ORIGINAL (File Copy)(IMPORTANT: See SecreIarts GuIde for preparing formC)edkd for Dimh
Forn No. 27M70)
INTERNATIONAL DEVELOPMENT INTERNATIONAL BANK FOR INTERNATIONAL FINANCEASSOCIATION RECONSTRUCTION ANDDEVELOPMENT CAAPOQATtON
OUTGOING WIRE"OL/ I
TO: DURFERT DATE 1975
DURGAPUR CLAS OF ajEE. ft!2T
ERVCE Ex. 6666 T1COUNTRY: INDIA
TEXT: FOR GENERAL MANAGER FCI.Cable No.:
REYRTX OCTOBER 25 BASED ON YOUR EVALUATION NO OBJECTION IN AWARDING
CARBAMATE PUMP TO URACA IF THEY ARE TECHNICALLY ACCEPTABLE AND HAVE
PROVEN PERFORMANCE STOP THE AMOUNT INVOLVED APPEARED GARBLED IN YOUR
TELEX STOP NE REQUEST YOU SEND US COPY OF BID SUMMA STOP
REYRTI OCTOBER 24 ON BOILER FEEDWATER PUMP PLEASE REFER TO
OTRTELEXES OCTOBER 1 TO GAUTAM AND OCTOBER 21 TO YOU STOP WE REPEAT
INSTRUCTION THAT YOU SOLICIT OUR APPROVAL ONLY ON PROCUREENT INVOLVING
AMOUNTS 50,000 DOLLARS AND ABOVE STOP FOR FURTHER CLARIFICATION AND
GUIDANCE PLEASE CONTACT FCI IN DELHI.
REGARDS
TORTORELLI
NOT TO BE TRA4NSMfIIED
AUTHORIZED By. CLEARANCS AND COPY DISTRIBUTION:
cc: DeweyNAME E. Tortorelli Perram, Shetty
Espiritu (Ids)SIGTUE Indu.tal Projects Department
SIGNATURE Z(SIGNATURE OF INDIVIDUAI. AUTHORIZED TO APPROVE)
REFERENCE. FEspiritu/om - INDIA - thrUe Byr Comnkation SectionPOIP
ORIGINAL (File Copy)(IMPORTANT: Sae Seetaries Guide for preparing form) Chocked for Dispatch
THE FERTILIZER CORPORATION OF INDIA LIMITED(GOVERNMENT OF INDIA UNDERTAKING)
(TROMBAY UNIT)TELEGRAMS: FERTILIZER Marvah. Chemnbur.PHONE: S 1 4 5 iBOMBAY 400 074,
Our Ref. No. PXT/42/41042 Bombay, Dated the - t1975.BY AIR MAIL
M/s. Industrial Projects Department,International Bank for Reconstructionand Development,
, 1818 H. Street, N.W.,Washington D.C. 20433,
Attn:- Mr. E. Tortorelli.
Sub:- Contract Documents for procurement of11000 Volts switchgear for Trombay-IV Expn.Project. (Credit No. 481 IN)
Dear Sir,
Enclosed please find the following documebts connection with procuremr
of 11000 volts switchgear and isolator panels required for main distribution
system of Trombay-IV Expansion group of plants
I) Bid Documents.
2) List of suppliers.
3) One copy of quotations received (4Nos.)
4) Bid comparison.
5) Bid selection.
6) Format 384,
7) Letter of Intent.
Since the validity of offer was expiring on 31/10/75, We have issued
conditional letter-of Intent on M/s. [:-i Jyoti Ltd., India for 3 Nos.
switchboards and M/s. NGEF Ltd., India for 9 Nos. isolator panels as per the
tender committee recommendations. The letter of intent have been issued after
taking into account the extra prices for certain items which were quoted by the
recommended parties after submission of main offer in response to technical
clarifications by us on the proposal.
These extra items have been shown in respective columns of our
comparative statement . Total order value as shown in form 384 is inclusive of
cost of spares parts and testing charges quoted he concerned vender.
In case of 3 Nos. 11000 volts swi tchgear recommended on M/s. Jyoti Ltd.
the letter of intebt has been issued on F6..R. Baroda basis.
Contd...2/-
origina Counicattoio
Date /1 / oSection
PXT/42/10142 Page No. 2
We may change this to F.O.R. Bombay basis, after estimating the economy
in the estimate of F.OLR. Bombay prices as shown in comparative statement vide
the offer with relation to freight & insurance to be paid extta by r.C.I., in
case of an order on F.O.R. Baroda basis only.
The firm order shall be issued only after receipt of your approval to
our propodal as above. We shall forward to you copies of contract as desized.
Kindly acknowledge receipt and intimate us your comments by telex/cable please.
Thanking you.
yours faithfully,
4 (B.P. GARODIA)DY. MATERIALSMANAGER (EXPN.)
C%")
INC q=DNG CABLE Distribution:
Industrial Proj.
Mr. Alisbah
NOV. 1, 1975
7 T
~~1 '7 51
?-P j -J
P P ) L -
CABLKt FEDO 'jV~S )FACT - CN - 284 VTELEPHONE: COCHIN 3ext
FACT ENGINEERING AND DESIGN RGANISAT ION(A Division of THE ERTILISERS AND CHEMICALS, TApORE L MITED)
UDYOGAMANDALVIA. COCHIN
RefP ,LO /2A* 19.711.
Mr. Z. TerterelliIndustrial Projects Dept.,International Bank for Reconstruction
and Development,1818 N. Street, N.W.Washington DC 20433. USA
Sub: Pertiliser Corporation of India TroabayProJeot - IDA Cr.No.481-IN(POIP)
Dear Sir,
We are enclosing herewith 2 copies of ourpurchase order No.3002/7020-10/TR.1 dated 20th Octeber '75placed on K/s. Davidson & Co., Belfast for Air Blowerrequired for the project.
Very truly yours,for THE FERTILISERS AND CHA(ICALS
TRAVANCORE LIMITEDPACT ENGG. & DESIGN ORGANISATION
Manager Purchase & Inspection.
V.e
A
E4 7
PTV
r~7rTee~ag"o 'wAbon-j - - -- .4- ADA
av V
- IY C
A A 6 U
C) Y a 0' 6 A4T$OT L1*~
wL ~*~ 7j
THE FERTILIZER CORPORATION OF INDIA LTD.
DURGAPUR DIVISION
REGO. & HEAD OFFICE Please reply to:F-43. SOUTH EXTN. AREA, PART 1. RING ROAB. DURGAPUR-713212
NEW DELHI-49 WEST BENGAL
GRAM : FERT LIZER GRAM I DURFERT
PHONE : 626221 ( 3 lines)
REF. NO. DPzL:EES:7095 DATED, THE- 27 10. 1975
The International Development Association1818 H, StreetM.N. Washington, D.C. 20433U*S.A.
Dear Sire,
Subs Modification of Durgapur Fertilizer Plantsunder World Bank Financing Scheme P.O.I4o.
We are sending herewith a copy of our Tender No.DPMJ:lES:7095dated 25.10.1975 issued by us for procuremant of Texperatiwe Transducer underWorld Bank Loan (POIP). This is for your information please.
Thanking you,
Yours faithfully,f or and on behalf of
TIlE FERTILIZER CORPORATION OF INDIA LIMTDDURGARMR DIVISION
4 ASSTT. MATERIALS MNAR (P)
nols As above
ca: Adviser (Fertilizer)Ministry of P & C, Shastri Bhavab N/Delhi .. alongwith the set of enquiry ls
co: O.S.D. (Projects)F.C.I. Ltd., N/Delhi .. -do-
cas Commercial Mana r,F.C.I. Ltd., N lhi .. -do-
Origifla Cotmn~ficatiOns
Date S i15 eJi
440098 IBRO U1 INCOMING CABLE o
ITT17/25 OCT VIA ITT WORLD COMM
ZCZC AWA793 VIA ITT CNY706 CBS009/25
UIWA HL INCX 183 f
DURGAPUR ONE 183/181 24 1940 PAGE 1/50
Distribution: Industrial ProjectsMr. Alisbah
LT
ANTONIOS TARA ILCKI
INDEVAS
WASHINGTONDC
PLEASE REFER OUR CABLE DTD THIRD OCTOBER WHICH IS REPRODUCED
BELOW FOR YOUR INFORMATION STOP REQUEST REPLY URGENTLY BY RETURN
TELEX STOP OUR TELEX NUMBER 020 -205 STOP MATTER URGENT
STOP REFYUR CABLE SIXTEENTH SEPTEMBER REGARDING BOILER
FEED PUMP STOP UNABLE TO CONSIDER X KSB WEST GERMANY
OFFER AS THE PUMP OFFERED BY
THEM IS OF WL TYPE
P.&,GE 2t(98
DESIGN STOP WE HAVE ALREADY THREE NUMBERS
OF WL TYPE DESIGN KSB INDIA PUMPS INSTALLED AND THEIR
PERFORMANCE EXTREMELY UNASATISFACTORY STOP KSDWEST GERMANY
OFFER OF PUMP WITH TERRY MAKE TURBINE AND IS NOT EQUIPPED
WITH CHANGEOVER SCHEME DURING POWER FAILURE WHEREAS WE HAVE
INSTALLED AT SITE THREE NUMBERS KKK MAKE TURBINES EQUIPPED
WITH AUTOMATIC CHANGEOVER DEVICE STOP MESSRS SULZERWISES
OFFER OS BOILER FEED PUMP IS WITH KKK MAKE TURBINE HENCE
CONSIDERABLE REDUCTION OF SPARE INVENTORY STOP
FOURTH HIGHEST OFFER OF BHARAT PUMP COMPRESSOR INDIA CANNOT BE
CONSIDERED DUE TO EXHORBITANT HIGH PRICE AND NONSUBMISSION OF PROPER
REFERENCE LIST OF SIMILAR PROVEN DESIGN STOP
THEREFORE REQUEST TELEX PERMISSION FOR RETENDERING OR REQUEST
YOUR RECONSIDERATION FOR LOWEST OFFER OF SULZERWIESE AS PROPOSED
EARLIER
PA h I'/33
TO AVOID CONSIDERABLE DELAY FOR FURTHER PROCESSING AS THE
SULZERWEISES QUOTATION WAS POSTED ONLY TWENTYFOUR HOURS LATE
AND TECHNICALLY MORE SUITABLE STOP
KC MADAN DURFERT DURGAPUR A RECEIVED.
INCOMING CABLE
Distribution: Industrial ProjectsL-/Mr. AUisbah
ITT16/OCT 26 1975
ZCZC AWA848 VIA ITT CNY858CS2/26
UIWA CO INCX 309
DURGAPUR ONE 309/306 25 1930 PAGE1/50
Oct 25 1975
ANTONIOS TARANWILCKI iNDEVAS
WASHINGTONDCUSA
1.0 PROPOSAL FOR PROCUREMENT OF CARBAMATE PUMP STOP PROCURMENT
UNDER POIP LOAN (NUMBER IN 481) IS APPROVED BY OUR BOARD
OF DIRECTORS STOP ACCORDINGLY INQUIRY WAS FLOATED TO THE FOLLIWING
FIRMS UNDER REGISTERED POST FOLLOWING ICS PROCEDURES AS PER APPROVED
SUPPLIERS LIST STOP QL WORTHINGTON PUMP
COL 1.0 (NUMBER IN 481) Q)
CS2/26 PAGE2/50
INTERNATIONAL LTD CROYDON ENGLAND B) PUMPEN FABRICK URACH
URACA WEST GERMAY C) JAPAN STEEL WORKS LIMITED TOKOYG JAPAN
D) BHARAT PUMPS AND COMPRESSORS LIMITED ALLAHABAD WE
ARE ALEADY HAVING THREE NOS OF CARBAMATE PUMPS OF PERONI MAKE (.)
THESE PUMOS ARE GIVING EXTEMELY POOR
CS2/26 PAGE3/50
PERFORMANCE WHICH HAS ACUTALLY RESULTED AND
NECESSLATED THE PROCUMENT OF THIS ADDITIONAL PUMP HENCE QUOATATION
WAS NOT ASKED FORM M/S JAPAN STEELS REPRESESTATIVE M/S
NISSO IWAI CO LTD CALCUTTA CONFIRMED VIDE THEIR LETTER DATED 19TH
AUGUST 75 THAT THEIR PRICIPAL WAS NOT IN
COL 2.0
CS2/26 PAGE4/50
A POSITION TO QUOTE STOP 3.0 M/S URACA WEST GERMANY HAVE
QUOTED IN TIME AGAINST OUR INQUIRY STOP WE HAVE TECHINUCALLY
SCUTINIZED THEIR OFFER AND
FOUND ACCEPTABLE TO US STOP THE COST OF COMPLETE UNIT INCLUDING
TURBINE AND OTHER ACCESSORIES COMES TO RUPEES
COL 4.0
CS2/26 PAGE5/50
HMILLIONS STOP 4.0 THE OVERALL PERFORMANCE OF THE PROPOSED
PUMP IS CONSIDERED PROVEN STOP THE STUFFING BOX
DESIGN FEATURES ARE SUPERIOR AND EXPCED LIFE IS MUCH LONGER AND
MAINTENCAE DOWN TIME AND SPARES CONSUMPTIONS MINIMUM STOP M/S
URACA REFERENCE LIST FOR SUPLY AND GOOD PERFORMANCE REPORTS FROM
ALL OVER THE
COL 4.0
CS2/26 PAGE6/56
WORLD MAXIMUM INCLUDING THE ONES OPERATING AT MADRAS FERTILIZER
LIMITED MADRAS INDIA STOP 5.0 PLEASE APPROVE THE PROCUREMENT
FORM URACA BY RETURNTELEX AS THE VALIDITY OF THE QUOTATION IS ONLY
UPTO THE END OF OCTOBER 1975 STOP THROUG REQUEST FOR FUFTHER
VALIDITY EXTENSION SENT TO M/S URACA (.)
GENERAL MANAGER FERTILIZER CORPN OF INDIA LTD DURGAPUR
COL 5.0
PSE RD PAGE50 IN COL 3.0 RPT 3.0 I/0 4.0
SUPHALA 011302700 (TELEX NO) INCOMING TELEX
248423A IBRV UR Distribution: IndusAia rOi 3 voi Mr . Alisbah
FROM: BOMBAY
MSG e.202 25.10.1975 11-00 AM IST
RROM: DMWNATE3IIES MANAGER (EXPN) FERTILIZER CORPH OF INDIA LTD.,
FOR: MR E TORTORELLI INDUSTRIAL PROJECTS DEPARTMENT IBRI WASHINGTON.
KINDLY REFER OUR TLX 35 DATED STH OCT 1975 REGARDING CONTRACT DOCUMIN
-S ON 3300. VOLTS SWITCHGEAR REQUIRED FOR TROMBAY IV EXPANSION
PROJECT (481.IN) WE INTEND TO AWARD THIS CONTACT TO NGEF LTD., INDIA
THE LOWEST BIDDER AT 0.47,62,471.00 ONLY FOR BOMBAY BASIS. WE HAVE
SENT TO YOU FOLLOWING DOCUMENTS VIDE OUR LETTER PXT/42/10129- -T
8.10.75:
1.1 SET OF QUOTATIONS RECD (3 NOS.) -
2. BID SUMMARY
3.81 SELECTION
4. FORMAT 354
5. LIST OF QUALIFIED PARTIES
6. 1 SET OF BID DOCUMENTS
,wi X-tTL* lk- -- aW A il.A ?ttuvl!- '-ta WV
24e42ZBT5rW UR
W PHALA 0115027
0 T
7. LETTER OF INTENT (CONDITIONAL) ISSUED TO NGEF LTD.
YOU AR+ ARE REQUESTED TO KINDLY INTIMATE US YOUR APPROVAL TO OURRECOMENDATIONS BY TELEX/CABLE TO ENABLE US TO RELEASE THE FIRMKETAIL+ DETAILED ORDER TO THE CONTRACTOR AT THE EARLIEST.
REGARDS
0
243425B IBRD UR
SUPHALA 0113027
THE FERTILIZER CORPORATION OF INDIA JIMITED(GOVERNMENT OF INDIA UNDERTAKING)
(TROMBAY UNIT)TELEGRAMS: FERTILIZER Marvali, Chembur.
PHONE S 1451 BOMBAY 400 074,B.P.Garodiao
Dy.Materials Manager (Expn.)Our Ref. No. Pur/:'xpn/WB/33 Bo mbay, Date d the.24th t,197
Dear Mr. Tortorelli,
Sub: Trombay IV - Submission of documentsof order No.PXY/12/ 0169
In continuation to our D.0. ter No.Pur/xpn/B/18 dated
8th July 1975, kindly find enclosed a copy of our order No.PXY/12/
10169 placed on M/s. Akay Industries, Bombay, India, for your
information and record.
Best regards,
Yours sincerely,
B.Garodia)
Mr. E. Tortorelli,Industrial Project Department,International Bank for Reconstruction & Development,1818 H. Street, N.W.,Washington D.C. 20433U.S.A.
Encl:
THE F8RTILIZER CORPORATION OF INDIA LIMITED(GOVERNMENT OF INDIA UNDERTAKING)
(TROMBAY UNIT)TELEGRAMS: FERTILIZER Marvali, Chembur.PHONE: 52 1451 BOMBAY 400 074.
Our Ref. No. /44 i 9 Bombay, Dated the 29th Oct 975.
M/a.International Bank forReconstruction & Development,1818 H. Street,N.W. Washington, D.C. 28433,U.S.A.
Attn:- Mr. E. Tortorelli.Industrial Project Dept.
Sub *- Our tender PXY/12/10069 Credit No. IN-481.
Dear Sirs,
Against our above tender we are enclosing following for your
information and receidua.
1) NIT,
2) PXK/12/15069 order copy.
3) PXK/12/10231 order copy.- / /
Thanking you.
Yours faithfully,
.. GAARODIA)DY. MATERIL . ~~ XPN.)
FomNo 27C~4~~M-70)
INTERNAflONAL DEVELOPMENT INTERNATIONAL BANK FOR INTERNATIONAL FINANCEASSOCIATION RECONSTRUCTIONAND DEVELOPMENT CORPORATION
OUTGOING WIRE
TO: FERTILIZER CORPORATION OF INDIA LTD. DATE October 24, 1975 iTROMBAY UNITBO1,BAY CLASS OF TiE&EX. 113027
SERVICEExt. 6666
COUNTRY: INDIA
TEXT: ATTN: NATERIALS MANAGERCable No.:
RERTI OCTOBER 8 RECEIVED AND REVIEWED FOLLOWING BID DOCUMENTS ON WHICH
WE HAVENO COMIENTS
PXT/ 42/1OO56 22KV SWITCHGEAR FUJI ELECTRIC THRU NISSHO IWAI
PXT/ 42/10129 3300W SWITCHGEAR NGEF LTD.
FXT/42/10055 22/11 KV TRANRIIER PAUWEIE TR&AO
REGARDS
TORTORELI
NOT TO BE TRANSMITM~
AUTHORIZED BY: CLEARANCES AND COPY DISTRIBUTION:
cc: Messrs. DeweyNAME E. Tortorelli Perram, Shetty
Espiritu (Ms)DEPT, IndustrA@Projects Department Robbin (Ms) - F530
Haiton(gsC-514SIGNATURE
IOR NNDIVI Ojp /o To APPROVE)'REFERENCE! p r_ O o ive By Comu l ns eto
ORIGINAL (File CopY)(IMPORTANT: Sao Sscretarh. Guide for ppering fonn) Chocked for Dispatch
orm 7
INTERNATIONAL DEVELOPMENT INTERNATIONAL BANK FOR INTERNATIONAL PINACEASSOCIATION RECONSTRUCTION ANDDEVELOPMENT CORPORATION
OUTGOING WIRE
TO: DURFERT DATE October 21 1975DURGAPUR
CLASS OFSERVICE:
Ext. 6666COUNTRY: INDIA 7/1/
TEXT; ATTN: MATERIALS MANAGERCable No..
DURING MY VISIT IN DELHI ARRANGEMENT WAS MADE WITH FCI AND GOVERNMENT
REGARDING A UNIFORM REPORTING SYSTEM ON PROCUREMENT FOR POIP STOP
PLEASE CONTACT FCI IN DELHI FOR GUIDANCE STOP AS PREVIOUSLY ADVISED
IN OUR- TI OCTOBER 1 YOU MAY SEEK IDA APPROVAL ON PROCUREMENT FOR
EQUIPMENT AND SERVICES AMOUNTING TO DOLIARS 50,000 AND ABOVE STOP
COPY OF BID EVALUATION SUMMARY AND PURCHASE ORDER MUST BE SUBMITTED
TO US FOR APPROVAL PRIOR TO DISBURSEMENT STOP PROCUREMENT UNDER DOLLARS
50,000 DO NOT REQUIRE IDA APPROVAL BUT COPY OF PURCHASE ORDER MUST ALSO
BE SENT TO US PRIOR TO DISBURSEMENT STOP
REGARDS
TORTORELLI
NOT TO UR TRANSMITTED
AUTHORIZED BY: IBUTION
NAME ermSetE. TortoreLli Espiritu (Ms)
DEPT. nutaInd118.Pro ects DepartmentSIGNATUREI
(SIGNATURE OF INDIVIDUAL AUTHORiZED TO APPROVE)REFERENCE. FEspiritu/om - INDIA - Durgapur Fert For Use By ComunwicationScflon
ORIGINAL (File Copy)(IMPORTANT See Secrteres Guide fr p|eparing form) Chocked for Dispetch
THE FERTILIZER CORPORATION OF INDIA LIMITED( GOVERNMENT OF INDIA UNDERTAKING)
(TROMBAY UNIT)TELEGRAMS: -FERTILIZER Marvali, Chernbur.PHONE: 5214I BOMBAY 400 074,
Our Ref. No. PXY/-11 5~1 Bombay, Dated the 216t O 975.
R/st International Bank forReconstruction & Development,1918 H. Street,N.. Washington, D.C. 20433,U.S.A.
Attn:- Mr. E. Tortp ______
Indust Project Dept.
Sub :- Our tender PXY/12/10058 and Credit No. IN-481Trombay-IV Expn.
Dear Sirs,
Further to our letter dt. 17/10/75 erclo'ng two part orders
i.e. PXK/12/10058 and 10206, we are encloding herewith another part order
PXK/12/10219 on M/s. Voest Alpine Austria against subject tender.
Thanking you.
Yours faithf lly,
(H.e. KULKARNI)for DY. MATERIALS MANAI1?ER (EXPN.)
FQRM NO. 384 INTERNATIONAL BANK FOR INTERNATIONAL DEVELOPMENT74) RECONSTRUCTION AND DEVELOPMENT ASSOCIATION
INFORMATION ON PROCUREMENT BY CONTRACT(This form should be filled in for all contracts approved by the Bank.J
INFORMATION SUPPLIED BY PROJECTS DEPT. 9 AMOUNT OF PROPOSED CONTRACT
1 DATE. (of filling form, should be same as date of approvall In currency of bid - As. 9. o., 5 I,
2. PERSON ORIGINATING FORM: In U. S. $ equivalent -
10. TYPE OF PROCUREMENT: (Check one)3. PROJECTS DEPARTMENT: International [ Local J Negotiated Q
4. DIVISION: (within above Dept.) 11, BIDS RECEIVED: (including lowest evaluated bid)
5. LOANCREDIT NUMBER: Nationality Amount of bd In % of evaluated5. LAN/REDT NMBE: .7M ~481 _______________ .$bid awarded
6. NAME ANO NATIONALITY OF COMPANY(IES) t g, C, /00(to which Contract will be awarded; underline prime contractor) t-f V d FO 0.m 5~ /.9 2- /22--V(:)e,+ Atpmi-c _ _ _ __ _ _ _
htd" 58"M "Ic7. COUNTRYDIES) OF ORIGIN: (of goods and services with estimated C C.. 5 W I ?
percentage breakdown where appropriate)
~L~4319, 3 7/1 Sri*% _
8. GOODS OR WORK COVERED BY CONTRACT: (Clearly describe thenature of goods to be supplied or work performed. Do not describe onlyby cross-reference to other documents.) 12. REMARKS:.
INFORMATION SUPPLIED BY CONTROLLER1 DEPT. Orgenization
65 ,mye- Type of Financng
Contract Purpose of Loan
1 3 4 1 5 7 89 Number
2
11 24 12 26 1. 11 21 N 23 N A3 4 V 3a W I;
J _1
Alpha.Country
Code Joint Bid Indicatorof Amount of Bank Portion
Borrower, (U.S.$ Equiv. to nearest $) Filler
FORM CODED BY:
October 21, 1975
Mr. S. Vankstamazu, AdvisorMiniatr7 of Petrolmum mnd C'emalsNew DelhiIndia
Dear Mr. V exuin,
Thank you for your letter of October 4.
I am glad to loam that sme i npovemnt of progreas reportingis foresem vt the suggestions you , wit Mhc I ntirely agree.
I am lookin forward to reeswving programs reports with yoursuggestion& In$orporated.
E. TortrelliIndmetrial Projects Departmat
cc: Messrs. FuchsDeweyPerram, ShettySonciniHamilton (Ms) - C514
ETortorelli - Trombay IV
/rEPalINCOMING AB :EP
ITT8/OCT 19 1975
ZCZC AWA408 VIA ITT CWG284 CHKO86 CS/19
UIWA CO INCX 045
DURGAPUR ONE 45 18 1655
Distribution: Induetrial ProjectsOctober 18, 1975 Mr. Alisbah
INDEVAS
WASHINGTONDCUSA
ATTN MR ANTONIOS TARNAWICKI STOP LOST OF SUPPLIERS
APPROVED BY IDA FOR DE-OXO REACTOR WITH ELECTRIC HEATER NOT
AVAILABLE STOP FLOATING ENQUIRY TO MESSRS ENGELHERD UK
AND CHEMINT IGALY FOR THIS ITEM STOP KINDLY APPROVE BY RETURN
TELEX STOP
CHAKRABORTY MATERIALS MANAGER DURFERT
COL DE-OXO
TELEGRAMS. PE DO TELEM 046- 264TELEPHONEt COCHIN 5201 -M $206
FACT ENGINEERING AND DESIGN ORGANISATION(A DIVISION OF THE FERT[LiSERS AND CHEMICALS. TRAVANCORE LIMITED)
UDYOGAMANDAL - 683 501VIA COCHIN
..... Dat ....'iP 14 .. DeI .ctiaber 1975
The Interrational Bank for Reconstructionand Development,
1818 H. Street N.W.,Washington D.C. 20433 (U.S.A.)
Attns: Mr. E. Tortorelli, Industrial Projeota Department
Subs ILL Loan/Credit under the Plant Operations ImprovementProgramme to FACT for Cochin Phase I and UdyogamandalUnits--- IBidding Documents-----------
Dear Sir,
We invite your kind attention to the above Loan/Credit for an amount ofUS $ 4 million. Since FEW0 (FACT Engineering and Design Organisation, a divisionof FACT) is taking up the work upto placement of orders, the enquiries will beissued by FEDO.
We are now enclosing herewith the following bidding document for yourprior approval:
1) Request for Quotation2) Attachment No.1 - Terms and Conditions of Purchase - 4 Pages3) Attachment No.2 - Instructions to Bidders - 3 Pages4 Proforma of Performance Bond/lank Guarantee for performance
We have prepared th e above documents in line with the bidding documents forThe Fertiliser Corporation of India Ltd. under IDA Loan/Credit No. 481 IN (POIP).In this connection kindly also refer to our letter No. PR/3002/GEN/12961 dated19th August 1975.
Apart from the above we would also like to inform you that we propose toadopt the following procedure for the proper functioning of the programmes
I. We arenot naking a fresh pre-qualification of suppliers for this Project.
2. We shall utilise the pre-qualified list of suppliers which we are alreadyhaving against our Cochin Phase II Project, wherever similar equipmentsrequired.
(.... .2)
FACT ENGINEERING AND DESIGN ORGANISATION
2-
3. We shall select the probable parties/suppliers for other equipmentsfor which we are not having any pre-qualified parties, from the"Hydrocarbon Pro cessing Catalogue".
4. We shall also contact reliable indigenous suppliers of repute.
5. For most of the equipments we are requiring replacements from theoriginal suppliers of these equipments. For these replacementswe are intending to contact only those original equipment suppliers.
We would request you to kindly conawy your approval of (a) the attachedbidding documents, ard (b) the procedure proposed to be adopted by us asgiven above, to emble us to proceed with the procurement work. Your cable/telexapproval will be very much appreciated.
Thanking you, we remain,
Very jr urs,TND CBEEI TRAv.LTD.,
Pi E 19 N D N ORGN.
MANAGERP SE & INSPECTION
Enol, as above
an
THE FERTILIZER CORPORATION OF INDIA LIMITED(GOVERNMENT OF INDIA UNDERTAKING)
(TROMBAY UNIT)TELEGRAMS , FERTILIZER ) vaC Chembur.PHON E: 5245 I MBAY 400 074,
Our Ref. No.P 2 12/3-04 ; Bombay, Dated the 17 Oct 1975.
1/s. International Bank forReconstruction & Development,1818 H. Street,N.W. Washington, D.C. 20433,U.S.A.
Attn:- Mr. E. Tortorelli.Industrial Project Dept.
Sub :- Our tendir PXY/12/10058 and cfedit No. IN-481Trambay-IV Expn.
Dear Sir,
Against our above tender we are enwloing following for your information
and record.
I) NIT
2) Order PXK/12/10058 copy
3) order PXK/12/10206 copy,-
Thanking you.
Yours faithfully,
D G IADY. MATE IALS MANA rER (EXPI)
Encl: As above.
FOMM NO. 384 INTERNATIONAL BANK FOR INTERNATIONAL DEVELOPMENT(6-74) RECONSTRUCTION AND DEVELOPMENT ASSOCIATION
INFORMATION ON PROCUREMENT BY CONTRACT(This form should be filled in for all contracts approved by the Bank.)
INFORMATION SUPPLIED BY PROJECTS DEPT. 9. AMOUNT OF PROPOSED CONTRACT:
1, DATE: (of filling form, should be same as date of approval) In currency of bid - i)M 42., H 1
2. PERSON ORIGINATING FORM: In U. S. $ equivalent - f I 54g. 0010. TYPE OF PROCUREMENT: (Check one)
3. PROJECTS DEPARTMENT: International [] Local E] Negotiated
4. DIVISION: (within above Dept.) 11. BIDS RECEIVED: (Including owest evaluated bid)
5 LOANICREDIT NUMBER: Nationality Amount of bid In %of evaluated5.LONCRDT UBE:mo bid awarded
6 NAME AND NATIONALITY OF COMPANYIIESh: P(3 / 5(to which Contract will be awarded; underline prime contractor) __
TrLL-rv2a 83H rmbTAns __ _
We-sd-- G-vriawn e&_ __ _ _ I_ _ _ q_,_0.34
7. COUNTRYUIES) OF ORIGIN: (of goods and services with estimatedpercentap breakdown whera appropriatel
. GOODS OR WORK COVERED BY CONTRACT: (Clearly describe thenature of goods to be supplied or work performed. Do not describe onlyby cross-reference to other documents.) 12. REMARKS:
INFORMATION SUPPLIED BY CONTROLLER'S DEPT. OrganizationType of Financing
contract Purpose of Loan
S3 4 1 5 7 8 N 2 1 2 r
Alpha.Country
Code Joint Bid Indicatorof Amount of Bank Portion
Borrower (U.S.$ Equiv. to nearest $ Filler
FORM CODED BY:
FORM NO, E INTERNATIONAL BANK FOR INTERNATIONAL DEVELOPMENT(67) RECONSTR UCTION AND DEVELOPMENT ASSOCIATION
INFORMATION ON PROCUREMENT BY CONTRACT(This form should be filled in for all contracm approved by the Bank.)
INFORMATION SUPPLIED BY PROJECTS DEPT. 9 AMOUNT OF PROPOSED CONTRACT:
1. DATE: (of filling form, should be same as date of approval) In currency of bid - 4 ',oo - ( 0
2. PERSON ORIGINATING FORM: In U. S.$ equivalent- k-6 2,
10. TYPE OF PROCUREMENT: (Check one)
3. PROJECTS DEPARTMENT: international [] Local Negotiated
4. DIVISION: Iwithin above Dept.) 11. BIOS RECEIVED: (Including lowest evaluated bid)
LOAN/CREIT NUMBER: Nationality Amount of bid In % of evaluated5.I LONCEIvNME: I bid awarded
0. NAME AND NATIONALITY OF COMPANY(IES):(to which Contract will be awarded; underline prime contractor) _______
rdW tr;-Y 47
7. COUNTRY(IES) OF ORIGIN: (of goods and services with estimated mA A/yA5 * $33percentage breakdown where eppropriate) 41et d
I. GOODS OR WORK COVERED BY CONTRACT: (Clearly describe thenature of goods to be supplied or work performed. Do not describe onlyby cross-reference to other documents.) 12. REMARKS
Be//. Cgffm f
INFORMATION SUPPLIED BY CONTROLLERS DEPT. OrganizationAl. ~Type of Financing
Contract Purpose of Loan
3 4 1 5 7 9 'IN INumber[ 1 "~ I '. '5 '6 7, 'I 8 M 1.V 2 -M = a
Alpha.Country
Code Joint Bid Indicatorof Amount of Bank Portion
orroweri IU.S.$ Equiv. to nearest $) Fier
FORM CODED BY:
'TH FERTILIZER CORPORATION OF INDIA LIMITED(GOVERNMENT of IND1A UNDERTAKING)
(TROMBAY UNIT) Marvali, Chembur.
TELEGRAMS FERTILIZER BOMBAY 400 074.
PHONE:5 1 5 sO BA 40 074.
Our Re(. No.XT/42/1008 4 LIBombay. Dated th17th Oct., 19 75
g/S Mr. E. Tortorelli,industrial Projects Department,
International Bank for Reconstruction
and Development,
1918 H. Street, N.W.,
Washington D.C. 20433,
U.S.A.
Dear Sir,
sub : Contract documents for purchase of
11000/3300 Volts Transformers for
Trom TV Expn proect.
We enclose6 herewith the following documents on
purchase
of 6 Nos. Transformers required for various sub-stations
in
our Trombay IV expansion Group of Plants; for your kind
reference & record.
1. Bid Summary2. Bid Selection3. Format 3844. Purchase order
Kindly acknowledge,
Thanking you, Yours faithfully,
(D.P. iAODIA)DY. MATEPIALS MANAGER(EXP10
TtIE jETILIZER CORf PRATION OF INDIA LIMITED(GOVERNMENT Of 4NlA UNDERTAKING)
(TROMBAY UNIT)TELEGRAMS: , FERTIULZER MarvaI. Chembur.
PHONE, 51 45 BOMBAY 400 074
Our Ref. No. PXK/12/10159 Bombay, Dated the 44j fl 1 9 75*
s/s. International Bank forReconstruction & Development,1818 H. Street,N.W. Washington, D.C. 20433,U.S.A .
Attnt- Mr. E. Torturellw- _Industrial P ject Dept.
SUB: - Our tender XK/12/10159 anf credit No. IN-481Arombay-IV
Dear Sirs,
Against our above tender we are enclosing herewith following for your
record.
I) NIT with list of parties.
2) Format 384,
3) Order copy.
Thanking you.
Yours fiathfully,
(B.P. GRRODIA)DY. MATERIALS MANA ER (EXPN.)
ovtokmr 15, 195
cMierftong o (awn.)Tu rvtarr~s cxPosam or man Lm9.mu tuey,0?uLta
DO W. Bkt
Raw TrWAWe ftqwmnidm T
cra Ia s . kB4Taxs in to asneddere" ot mWd tbmak ym Ao year
lettorw o Otober 6, 1975,aelsa yaw xnWqA Prvor" Rvpe4*a. 2h teW tMe *nth of SqYMssaw X975.
YOWS,
Oct iW*s. TbrtoreUi, Sbatty, pNnnu
- x - - . -- - - - T -
- - - 4
- - ---. t -.- - -3:
- x--p -exas . ..
-- --- z. ... ... .- .-2.- -- - -: t -. .- : - 4
- - s ..
- .- - - -- . : - - - x.. e ze - -- - --
SUPHALA 01130270 (yes N.
248423A IBRD UR
24S423A IBRD UR d' ra rX.Alisbah
From: Bombay
;SO E].35 9.10.1975 4 AM IST
FPO": DY M* ATERIALS M1ANAGER C -XPN) FERTILIZER CORPN OF INDIA LTD.,
BOMBAY INDIA
FOR: M4R E TORTORELLI WORLD BANK
KINDLY NOTE THAT WE HAVE SENT TO YOU ON 50.9.75 THE FOLLOWING
CONTRACT DOCUMENTS FOR YOUR SCRUTINY APPROVAL AND RECORD :
1. PXT/42/1004++ 100056 - 22 KV SWITCHG[AR AND ACCES$ORIES.
2. PXT/42/10055 - 22/11 KV TRANSFORNER (2 NOS. ORDER COPIES ONLY)
3. PXT/42/10129 - 3300 VOLTS SS+ SWITCHGEAR AND ACCESSORIES.
YOU ARE REQUESTED TO KINDLY ACKNOWLEDGE AND INTIMATE US YOUR
APPROVAL AT THE EARLIEST TO ENABLE US TO PROCESS THE CASE FURTHER.
OVER
248423A IBRD UR
SUPHALA 0113027
THE FERTILIZER CORPORATION OF INDIA JTE(GOVERNMENT OF INDIA UNDERTAKIN
(TROMBAY EXPANSION)Telegrams: 'FERTILIZER' 4 (AS)
BOMBAY-74. 5- C. De Baksi 2sz2 4sIGeneral Project Manager
Our Ref. No. Expn. 1(59)B/75 ,so- 9 ____1975
Dear Mr. Tortorelli,
Trombay IV- Expansion -Monthly r~rs R!EEt No.16
I am enclosing the Monthly Progress Report No.16.We have included the items under Yard Piping and Valvesin this month's report.
Yours sincerely,
(S.C. De Baksi)
Mr. E. Tortorelli,International Development Association,Industrial Project Department,1818 H.Street N.WWashington DC 20433.
Encl: As above.
EKeTi Y2 spb: '
ICep uapou DC &t33C
IATB '506 17*1(ILqrfLT s; Exto'ec; DebtrswEU;Iuss A FGAcr T obwJ) Y2 4o CI L4 OAT
N1 2- 1QL.PL&TT*
I~~~~( (m6!4,L % 1
M8a psA6 TLacingeq speiinnuGXt ASI bTE'tua 9uq AsTAC2
i em Gucjoaxud ;pe wNOI4PTA broaiL6e gsbox4 LjQTE*
jtwpeiA IA- Exbauer1bu -
Qf"' ve MO' rx r(s)3\ 21 e p DctOPer
ji
x 4uL T bV,'6C$ jlUJ
BOWeVA-11 2 C' De B91CE1 t
( VOWIA EXbIIOM) ) (v2)
(COAEK1wEMj OL IWDIV fWDEVIVKIM
IHE EE~iFlIlXEB COL6bOB~VIOLA OL ILDIV- LED
THE FERTILIZER CORPORATION OF IN IA LIMITED(GOVERNMENT OF INDIA UNDERTAKING y k'c
(TROMBAY UNIT)TELEGRAMS' FERTILIZER Marvali, Chemnbur.PHONE: 521451 rn BOMBAY 400 074,
Our Ref. No. Bombay, Dated the 19
wlSH 14 5 '11 o
vif i Oy.Yp.(cXPN)JCz LTD., TROMMAY uIT, UKAY74, INDIA.
FRa t W. E. TORURoELL19 WORLD BAfJ.
KINDLY NTE TIUkT WE WE SENr T YOU O - ew67 TIH FOLOING CONTRACT OCUMENis roR
YOMR SCWTIlNY APPROVAL AND KECCIRD (0)
1. PTW/42/005 . 22 KV SIrCHAR & ACCE65MIES
2. PXT/42/11nnss -22/11 KV. TRPIWORMER (2 WS. MnET9 COPIES ONLY)
30 PXT/42/1129 - 3300 VOLTS SWITPCHMAR AND ACCESSORIES
YOU APE REQUESTED TO KISLY ACK92WLE)GE AND IWAMATE US YCUR APPROVAL AT THE EARLEST
TO ENABLE US TO PROCESS TE CASE FURTER ()REARDS (
".TIT.PXT/42/1005%.6th Octaber.75. C-
ISIS.P H, M O.
OY. MTERIALS MA ,AGER(EXPNt).
Confimetimn so kx !A&:-02&1 to:
Rr* Eo YortarellipIndlustrial Project DepAitment,International Bank Por Recona*uftle &
MS1 H. Straott D.C. 20433,N.M., Washingtong
By AXR IJ"AIL
Telegram: "ETROCHEM"S' Venk ft arD ITn , D.O.N).3 ( AyAdv is er (Fert ilizere ) . a'It FWTWT
MINISTRY OF PETAOLEUM & CHMICALS(PETROLEUM AUR RASAYAN MANTRALAYA)
New DelhiOctober 4, 1975.
Dear Dir. T :rtorelli,
While recently reviewing the pr ogresof Trombay IV, I noted that the progreesreporting could do with some improvement,especially to bring consistency of the -datafurnished with the terminology uaed. I hddiscused the possiFilities with Nr. De Bakaiand my suggest ions @re contained in the enclosedletter to Mr. K.C. Sharmta. I do hope that youagree with them andiwould like tc hear if thereare any further auggestion.
With regards,
Yours sincerely,
(S. Venkataranaff),
Yx. T 3rtcrelli,Industrhi l Projects Deprtment,Internqtiongl Bank for Recons truction
and vevel opment,1818, H StreetWASEIhGTON DC (USA).
ncl: As above.
S. Yemktwiaa, .O)Adviser (Prt ilisers).
Oatsb'w 4# 1975.
Ny dear Shermaji,
when I visited Tromboy on Ird Osteber, 1975,1 bad discussed the progress ropert far Trouby IVfor the menth of August, 1975, with Shri Isksi andhis fficers. Duriag the diaussiame, I had drowntheir attention to several inconsistereles and possibleimprovements an broadly indieated balow.
1. In Annexure I eovering eritioal aet ivit iee,the entries under lSeheduled Completina Dots" arepartly based en original tire s1hedule and portlyon current expectat ions. This posit in i netdesirable and eauses Inconsistonies as in setivity007-009 where the "Seheduled Complet ion* date is41 months later tfen the'latest allowable date".It would I* desirable if the entries under the column"Scheduled Completionodato reflects the pesition asper the latest approved t ine sehedule and theexpectations of delays or earlier osmpletion arerefleoted by entries under "Likely oseplet ion date".The first three columns vocid then bring out clearlythe anticipated delay and the impaet on projectcompletion mare clearly.
2. During the dia-ussions, I was informed thetthe tire schedule for Trembay does not Indieatescheduled otarting and eompletion dates for the various#etivities. The schedule only indicates the earliestand latest starting and finishing dates for the varionsaetivities. This position eauses difficulties inevaluating delays in the aetivities and the projeetin a relotive manner. Mr. Ds Bakal agrees with asthat there must be scheduled dates for the startingand sompletion of the various activities and forpurposes of monitoring the project he would preferthese to be earliest dotee. Annexure I would begrended on this bsia
30 I suggested that Annexure 1 nay be presented
-2
under three sub-groups.
A. Aetivities new empleted but with impaet onoverall time sehedule.
N. Activities in progress but expeeted to becompleted after the latest complet ion date, and
C. Ativities not yet started but for whioh thelatest starting dates have passed.
Management attention would be needed in category BCactivities only.
4. I have suggested that while making the firstamendment, an explanatory note may be added. The sectionmay als pick up the more critical items and indicateboth status and possible remedial measures in a briefwrite up. As an example in the absence of such a write updelays in activities 010-073 and 073-074 relating te coatingagent can cause undue alarm. Such a write up would alosfacilitate managerial interventian when required.
5. Annexure II follows the same general pattern asAnnexure I and would ale require to be amended as suggestedin para I above
6. In Annexure III - aterial pracurement status, thereare items where bide have been received several months backand not yet evaluated or evaluated several months back butnot yet ordered. These can usefully be brought out in ashort write up indicating reasons and impact an projectschedule, if any.
7. In Annexure V - Review ef Financial Status, entriesunder column "Estimated requirement to tinish" are beingobtained by deduct ing "Expenses and Commitments" from"Original estimated Cast". As a result, these tables denot reflect even known escalations based on commitmentsalready entered into. These tables d net alos help toassess the progress of the project based an ompletedshare of commitments and expenditure. I have suggestedthat these tables be amended to serve their purpose in theprogress report.
8. The report does not include a chart indieatingthe anticipated delay as of date based an the best available
Centd.../-
informatio. You may recall that suck a ekort ho beenusefully adopted in the Nongal Expansion report and oanwith advantag be Iadded to the Troboy IV report.
9. 1 am endorsing a copy of this letter to BShr DoBakSi and I would appreciate if Improvement of progressreport ing is ens eiderd based an t bhe arbov suggest isd.
With bot regards,
Yours a inaerely,
Bd/.
(#B. Veak.taraon)
Shri 1.0. Sharma,Chairman & Managing Direct r,Fertilizer Corporation of India,Now Delhi.
Copy forwarded for information and necessaryaction to Shri S.0. Do Baksi, General Project Manager,Fertiliser Corporation of India, trambsy.
(3. Yon-a am
INCG1ING CABLI . d
ITT5/OCT 4 1975 VIA ITT WORLDCOMMIndustrial Projs.r. Alibah
ZCZC AWA367 VIA ITT CNY444 CS23/4
UIOv;A CO INOX 075
DURGAPUR ON 75/71 3 1820 PAGE 1/50
Oct. 3, 75
MR ANDONIC S TARNAWIECKI INDUSTRIAL PROJECTS INDEAS
WASHINGTON-DC
REFOURENQ OP .MM.EES.7063 STOP AGAINST SEVEN ENQUIRISSENT
RECEIVED TWO NUMBERS STOP OFFERS OF INDIAN PARTIES RECEIVED
IN TIME AND THE OFFER OF MESSRS R STALL WEST GERMANY RECEIVED
LATTF
+t I. !LpI
HENCE ORDER IS TO BE PLACED ON THEM FOR THESE TWO ITEMS STOP
SOLICIT YOUR APPROVAL STOP REGARDS
GAUTAM DURFERT DURGAPUR
THE FERTILIZER CORPORATION OF INDIA LTD.qRN1TVR Z-fTRYWff TW im Fgo
DURGAPUR DIVISION
REGD. & HEAD OFFICE Please reply toF-43. SOUTH EXTN. AREA, PART 1, RING ROAD. DURGAPUR-7$321I
NEW DELHI-49 WEST BENGALGRAM : FERTILIZER GRAM ; DURFERT
PHONE: 62-6221 (3 lines)
REF. NO. I?:oL1:C S3;7081 DATED, THE
The International Development Association1018 11. Street,;,;-. Jashington, D.C.20433U.* .A.
iear Sirs,Sub-- Mouification of Durgapur Vertilizer vlrin's
under World Dank 1in-c ig Cchec ...
Ide are soaiin. herevi th a copy of our Tenuer Ko.DP: 1:a:7-1 d sei3.10.1975 issued by us for procure oiit of parts for convqrsion Al .1 4C or iiduLterfly Valve unmer W!orlLi Iinnk Loan (1'12) for inroration. These are goiteas. of /s.X-1kAlliot Automation S.A., France.
Tehanking you,
Yours faithfully,ior LJnd on behalf of
The Vertilizer Corporation of India LiiaitceDurgapur Division.
A /st.at r als nhr(eincl: As above.
c.c.: Adviser (Fertilizer), Ministry of P&C,Shastri Bhavan, New Delhi. - Along with the set of
letter.OSW (Projects), PCI, New Dolhi - -do-Comraercial Manaer, 1CI, New Delhi - --do-
THE FERTILIZER CORPORATION OF INDIA LTD.WlZTm9 W;ZqrM; %fTqi twT ff 0
DURGAPUR DIVISION
REGO. . HEAD OFFICE Please reply to:F-43, SOUTH EXTN. AREA, PART 1. RING ROAD, DUAGAPUR-713212
NEW DELHI-49 WEST BENGALGRAM : FERTILIZER GRAM :DURFERT
PHONE 62-6221 (3 lines)
REF. NO. L ::S:7O82/ DATED, THE 9 7'
The International Development Association1818 11. street,I.N. WashingLon, L.C.20433
Dear Sira,
-Sub:- Modification of Durgapur Fertilizer Plantsunder "dorld Bank Financing Scheme P.U.IP.
l are sending herewith a copy of our Tender No.DP:1lc:ES:7082 dated3.10.1975 issued by us for procurewent of spares for At/C Type positioner(irg. No. 23) under dorld Bank Loan (POIP) for information. These are proprie-tory items of 4/s. Struiuentazione Industrial S.n.c., Italy.
Thanking you,
Yours faithfully,For and on beha&f of
The Fertilizer Corporation of India Ltd.Durgapur Division.
Asst. erials Manager (U)Encl: As above.
c.ce. Adviser (Fertilizer), Ministry of P&CShastri Bhavan, New Delhi. Along with the set of enutuiry
letter.OS (Projects), FCI, New Delhi. -do-Commercial Manager, FCI, New Delhi. -do-
-91
iTT2/OCT 4 1975 VIA ITT WORLDCOMM
Distribution:
ZCZC AWA355 VIA ITT CNY377 CS10/4 Industrial Projs>-Hr. Alisbah
UlA CO INCX 180
DURGAPUR ONE 180/177 3 1717 PAGE 1/50
Oct. 3, 75
PERSAM INDEVAS
WASHINGTON-DC-USA
REFYUR CABLE SIXTEENTH SEPTEMBER REGARDING BOILER FEED PUMP
STOP UNABLE TO CONSIDER KSB WEST BERMANY OFFER AS THE PUMP OFFERED
BY THEM IS OF WL TYPE DESIGN STOP WE HAVE ALREADY
THREE NUMBERS OF WL TYPE DESIGN KSB INDIA PUMPS
INSTALLED AND THEIR PERFORMANCE EXTREMELY UNSATISFACTORY STOP
COL PERSA-m WASH!IfifON OC-iJS
KSB WEST GERMANY OFFER OF PUMP WITH TERRY MAKE TURBINE AND IS
NOT EQUIPPED WITH CHANGEOVER SCHEME DURING POWER FAILURE WHEREAS
WE HAVE INSTALLED AT SITE THREE NIMBERS KKK MAKE TURBINES
EQUIPPED WITH AUTIMATIC CHANGEOVER DEVICE
STOP MESSRS SULZERWEISES OFFER OF BOILER FEED PUMP IS
WITH KKM MAKE TURBINE HENCE
CONSIDERABLE REDUCTION OF SPARE INVENTORY STOP FOURTH HIGHEST
OFFER OF BHARAT PUMP COMPRESSOR INDIA CANNOT BE CONSIDRED DUETO EXHORGITANT HIGH PRICE AND NONSUBMISSION OF PROPER REFERENCE
LIST OF SIMILAR PROVEN DESIGN STOP
THEREFORE REQUEST TELEX PERMISSION FOR RETINERING OR REQUEST
YOUR RECONSIDERATION FOR LOWEST OFFER OF SULZERWEISE AS PROPSED
C-5 i 64 P AGEft t--/2
EARLIER TO AVOID CONSIDERABLE DELAY FOR FURTHER PROCESSING AS
THE SULZERWISES QUOTATION WAS POSTED ONLY TWENTYFOUR HOUS LATE
AND TECHNICALL MORE SHITABLE STOP
KC MADAN DURFERT DURGAPUR
INTERNATIONAL DEVELOPMENT INTERNATIONAL BANK FOR INTERNATINAL FINANCEASSOCIATION RECONSTRUCTIONANDDEVELOPMENT COPORATION
OUTGOING WIRE
TO: D T DATE October 3, 1975DURGAPUR
CLASS OF miltaWSERVICE
Ext. 6657
COUNTRY: INDIA
TEXT:CableNo OG
REYOUR TWO TELEES OF SEPT 30 PLEASE REFER TO OURTEL OCTOBER 1 RE
PROCUREMENT PROCEDURE FOR POIP STOP WE NOTICED FREQUENCY IN YOUR
LATE RECEIPT OF TENDERS SO WE REPEAT SUGGESTION OURTEL OCTOBER 1
THAT YOU ALLOW MORE TIME FOR PREPARATION AND MAIL DELIVERIES.
REGARDS
PERRAM
NOT TO BE TRANsM TED
AUTMORIZE IY CLEARANCES AND COPY DISTRIBUTION;
cc: Messrs. DeweyNAME A erram Tortorei/het
Espiritu (Ms)DEPT. Industri Projects Department
SIGNATUREFS(STGNAfUR OF INDEVIDUAL AUTHORIZED TO APPROVE)
REFERENCE: AV FEspiritu/om - INDIA - Durgapur FertU
ORIGINAL (File Copy)(IWORTANT See Secetifles GuIf fo preparing fon Cheked for DispatU
:. ::....... :- . :. ... ... .. .. .. .-: . .
x IC4... ......... ...... ... ... ...... ... .... ..... ....... ... ...
...... .............
Form No. 27f3-70)
INTERNATIONAL DEVELOPMENT INTERNATIONAL BANK FOR INTERNATIONAL FNANCEASSOCIATION RECONSTRUCTIONANDDEVELOPMENT CORPORATION
OUTGOING WIRE
TO: DURFERT DATE: Otober 1, 1975
DURGAPUR CLASS OfSERVICE: /. / -f
=Ext.F57
COUNTRY: INDIA
TEXT: FOR GAUTAM,Cable No.:
REYRTEL SEPTEMBER 29 ON INQUIRY DP-M-EES-6068 AMOUNT INVOLVED TOO SMALL
TO REQUIRE IDA PRIOR APPROVAL STOP FOR UNIFORMITY YOU MAY SEEK IDA APPROVAL
ON PROCUREMENT AMOUNTING TO DOLLARS 50,000 AND ABOVE UNTIL DEBAKSI AND
TORTORELLI HAVE ARRANGED A UNIFORM REPORTING SYSTEM ON PROCUREMENT FOR POIP
REFERENCE OURTEL SEPTEMBER 18 TO DEBAKSI STOP ON BASIS *@ ! YRTEL
SEPTEMBER 29 DO NOT SEE ANY REASON TO OBJECT TO YOUR CONSIDERING OFFER
MAILED BEFORE DUE DATE AND SUGGEST YOU ALLOW MORE TIME FOR PREPARATION
AND MAIL DELIVERIES IN FUTURE.
REGARDS
PERRAM
NOT TO BE TRANSMITTED
AUTHORIZED BY; CLEARANCES AND COPY DITRIBUTION:
NAME A. Perram cc: Messrs. FuchsDewey
DEPT- Industrial P jects Dep Tortoreli/Shetty
SIGNATURE Espiritu (Ms)
fSIGNATURE OF INDIVIDUAL AUTHORIZED To APPROVE)REFERENCE; FEspiritu/om - INDIA (Durgapur Fert,) w Use B ComuniwcaionseSeN
ORIGINAL (File Copy)(IMPORTANT: See Secretaries Guide for preparing form) Checked for Dispatch:
440098 IBRD UI AlINC0LC CA - - sd
ITT 28/30 SEP 1975
ZCZC AWA044 VIA ITT CNY827 CS02/1
UIWA CO INCX 095
DURGAPUR ONE 95/91 30 1835 PAGE 1/50 Inusa Proj
Sept. 30, 75
MR ANTONIO S TARNAWICCKI INDUSTRIAL PROJECTS
INDEVAS
WASHINGTONDC/USA
REFOURCMQ P/DP/MMA/ES/7015-75 AGAINST ELEVEN ENQUIRIES
ISSUED ONLY TWO QUOTATIONS RECEIVED IN TIME (.) FOR ONLY ONE ITEMOF VALVE OM 4040 ORDER TO BE PLACED ONLATE TENDER MESSRS HANYWELLGOBH WEST GERMANY AS OFFERS OF MESSRS BLACK BOROUGH
UK WHICH HAS BEEN
RECEIVED IN TIME IS NET FOUND TECHNICALLY SUITABLE FOR THIS ITEMOTHERWISE FOR ALL OTHER ITEMS THE ORDER IS BEING PLACED ON THEMBEING CHEAPEST AND THEIR QUOTATION RECEIVED IN TIME (.) SOLICITYOUR APPROVAL
GAUTAM DURFERT DURGAPUR
0
440098 IBRD Ul INLI[ING "ABLE s
ITT 1/01 OCT
AWA 046 VIA ITT CNY8' 40 C 5/1 i15OCT -i I 12: 0 Distribution:
UIWA CO INCX 106 Industrial Proj.Mr . Alisbal
DURGAPUR ONE 106/102 1730 PAGE 1/50
Sept. 30, 197
MR ANONIO S TARNAWIECKI INDISTRIAL PROJECTS INDEVAS
WASHINGTON :-DC /USA
REFOURENQ P /DP /MM /EES /7033 AND 7037 AG INST ELEVEN
NUMBER OF THE ENQUIRIES SENT ONLY SEVEN NUMBERS OF PARTIES
HAVE SENT THEIR OFFERS OUT OF WHICH ONLY ONE QUOTATION OF
MESSRSEUR CONTROL ITALY RECEIVED IN TIME AND ORDERS FOR
THE ITEMS QUOTED BY THEM T.CHNICALLY
SUITABLE IS BEING PLACED C.) ORDERS FOR SOME ITEMS OF
VALUE APPROX LB 905 AND LIRE
513 THOUSAND TO BE PLACED ON THE LATE TENDERS MESSERS
HONEYWELL UK AND U S A RESPECTIVELY AS THEY HAVE ONLY QUOTED
TECHNICALLY SUITBALE ITEMS (.)
SOLICIT YOUR APPROVL (.) REGARDS
GAUTAM DURFERT DURGAPUR
NOTE: TEXT AS RWEIVED
K ifINCDNNG GABLE E/' /ITT C
September 29, 1975Distribution:Industrial ProjectsMr. Alisbah
1T I I I T L.. L' IL I "i
- (.) (,)
:LLY ST:Ti 2G U TH K Ii g (. I
ALtL'IV ITALY IC A DELShilPATCHEO BY 3 ARTY bF. i I HEL TENDER
C I.G IATE A VWCVALLY AND FRK 5EL IVE Y > INT F V IE
ACCE5TALE SI T IG T. kR EKUIK ELiTS A E AL LI INV LVEC
L +51.] C;.) 0L ICf Y ou APPVAL Fr CIDE.IG TC:E
F EFFEr. F2
Fom No- 27t370)
INTERNATIONAL DEVELOPMENT INTERNATIONAL BANK FOR INTERNATIONAL FINANCEASSOCIATION RECONSTRUCTION AND DEVELOPMENT CORPORATION
OUTGOING WIRE
TO: DURERT DATE: Septber 29, 197 i
11URGAPUR CLASS OF , /4SERVICE: Telex: 74c)%- 6657)
COUNTRY. I
TEXT FOR GAUTAMCable No.:
REYRTETX SPMMER 26 YOUR PROPOSAL TO AWARD OMEN ANALYE To HARTHM
AND BRAUN APPEARS TO B A CIEAR DEVIATION FROM INSTUCTIONS TO BIDDERS STOP
SUGGEST YOU REFLOAT INQUIRY UNLESS TIMNG IS CRITICAL IN WHEICH CASE
REIDDNnG BY TELEX WOULD BE APPROPRIATE REGARDS
NOT TO BE TRANSMfTIM
AUTHORIZED BY: Mr Anthony R. Perram CLEARANCE$ AND COPY DISTRIBUTION:
NAME cc: Messrs. Fuche
DEPT. Indus De, t~rojctsTortorell:/ftetty
SIGNATURE ____ ____ __M Espi(SGN~tfURE OF INDIVIDUAL AUTHORIZED TO APPROVE)
REFERENCEt credit: 481-IN For Use By Communications Setion
FF~spiri-ttx es
ORIGINAL (File Copy)(IMPORTANT: See Secretaries Guide for preparing form) Chwcked for Dispatclt
THE FERTILIZER CORPORATION OF INDIA LIMITED( GOVERNMENT OF INDIA UNDERTAKING)
(TROMSAY UNIT)TELEGRAMS: FERTILIZER Marvali. Chemrbr,PHONE 521451 BOMBAY 400 074,
Our Ref. No. PUR/EXPt/WB/32 6 i Bombay Dated the 25th Sept. 19 75
9.P# GarodiaDy. Materials Manager(Expn.)
Dear Sr. Tortorelli,
Subject: Trombay IVSubmission of documents
-CN Solution Coolersour P.O. No. PXY/12/10069.
Kindly find snc1sed a copy of purchase order number PXY/12/10069
in reapset of Priewutralized CN Solution Coolers(2 Nos) placed an
1/a SiaS Lor$,oi, Italy for favour of your information and record.
ith best regards,
Yours Sincerely,
(e3.P. Iarodia)
Mr. E. Tortorelli,Industrial Project Department,International Bank for Reconstruction and Development1818 IR. Street,N.W. Washington, D.C. 20433U.S.A
sq/27/90
THE FERTILIZER CORPORATION OF JNDIA LIMITED(GOVERNMENT OF INDIA UNDERTAKING )7
(TROMBAY UNIT)TELEGRAMS: FERTILIZER Marvali, Chembur.PHONE: 52 1451 W BOMBAY 400 074,
Our Ref. No.P"V/12/105. Bombay, Dated the 26th Sept., 19 75.
m/s. International Bank for Reconstruction
and Development,1618, H.Strest,N.W., Washington D.C. 20433,U.S.A1.
(Attn. Mr. E. TortorelliIndustrial Project Dept.,)
Sub t Our tender PXY/121Q0I0 & Credt No. IN.481.
Dear Sire, /.)
Enclosed please find following in connection with our tender referred
above.
1. K.I.T.2. Format 384.3. 2 cspies of order.
Thapking you,
Yours faithfully,
(B.P. GARODIA)DY.MATERIALS MANAGE(EXPN).
THE FERTILIZER CORPORATION OF INDIA LIMITED(GOVERNMENT OF INDIA UNDERTAKING D
(TROMBAY UNIT)TELEGRAMS: I FERTILIZER Marvali, Chfmbur.PHONE: 5 1451 BOMBAY 400 074,
Our Ref. No.PxY12/1-054. Bombay, Dated the 19 7S
M/s. International Bank for Reconstructionand Development,
1818, H.Street,N.W. Washington, D.C. 20433,
(Attn.Mr. E.TrtorelliIndustrial Project Dept.,)
Sub : Our tender PXY11210054 and credit No. IN-481.
Dear Sir,
further to our letter Pur/Expn/WB/11 dated lst Feb.,75, W6 are
enclosing herewith a format B84 and 2 copies of order PXK/12/10200 for
2 Tanks covered under above tender, foi your kind information,
Thanking you,
Yours faithfully,
(8.P. CAREncl As above. DY. MA LS MANAGER(EXPN).
'.'~~rONPAL tUVELGOMWI
to 4P4so simCt ON AND DtvE LOPMNT ~~CAI
INFORMATION ON PROCUREMENT BY CONTRACT
us oma atnofmueif0 W040JECTS E-
~~. ~AT~- e $ w oT- v C-wO
ii P OP P iAM E- - --- --
LW t"1 oJoCr3 ()w 1dT vMT
NA. AO NIhTOEALtTV OF COtWANYIIS. -CA
uJds $11 ___________ se dta
** _v Do _
1 /t1& pC2 /3
coafye~ O OIIWWfRUPady btaa at m$t n
(mak Cke awkdo5 , 3 Zs 1X4-*-- c-
8,00005 OP WOCRK COVERED SY C0NTRACT: C 1y re01W th1'1 ' ocds to b* sppaid or Wafle V arnmmd. Do not dusaibi Q4i y
trr frn-ermwc ta otiIr5 cu4
IWOSATON &UPPL ED BY WHThOLLUWW DW- kmn 4u
Typm of Fiawacm3
V,*agtnxm o~1I@~f LQA
t77 34 7
Cooumiyarm Bd lndiWr
AMOeat Qf Uank POMtOAn J* EMv 1 ne
F0RM CODEW SV
'THE FERTILIZER CORPORATION OF INDIA LIMITED(GOVERNMENT OF INDIA UNDERTAKING)
(TROMBAY UNIT)TELEGRAMS: 'FERTILIZER Marvali. Chembur.
PHONE: 52 145 1 BOMBAY 400 074.
Our Ref. NoPXY/1 2/1 0050. Bombay, Dated the 26th Sept., 19 75.
M/s. International Bank for Reconstructionand Development,
1818, H.Street,NoW., Washington D.C. 20433,U.S.A.
(Attn. Mr. E. TortorelliIndustrial Project Dept.,)
Sub : Our tender PXY/12/10050 & Credit No, IN,481,
Dear Sirs,
Enclosed please find following in connection with our tender referred
above.
1. N.I.T.2. Format 384.3. 2 copies of order.
Thapiking you,
Yours faithfully,
(B.P. GARODIA)DY.MATERIALS MANAGER(EXPN).
F ato Cemnc n
V c',Distribution: Industrial Proj ta
Z a vIA L L CKA2 4 Mr. Alibah
GUMAHU I /z/6) 2 u 1&25
Sept 26th 1975
PE SA IN VA
C AV (s
Fr yK G'T N A Y'Y
T C WNC tLL IuTA-.LI (.) eFF~ Eoad0 MAi IA INU 'AU Ell- L Y So LA n IE u C L Y UL-E N E C C I I
Y P. iTS 1 LJ L C L L ICIT
NEU 1 LE ( .)GAUTA~~~ TdFg gsp
THE FERTILIZER CORPORATION OF INDIA LIMITED(GOVERNMENT OF INDIA UNDERTAKING)
(TROMBAY UNIT)TELEGRAMS: -FERTILIZER Marval. Chembur.PHONE: 52 1451 SOMBAY 400 074
Our Ref. No. Bombay, Dated the 197
International Bank ofor Reconstructionand Development,
1818 H, Street, N.W.,Washington D.C. 20433,U.S.A.
Attnt- Mr. E. Tortorelli,Industrial Projects Department.
Sub I- Tr!bi=YV roject IDA Credit No. 481 IN.
Dear Sir,
We are enclosing herewith the following amendments to the orderswhich have been already sent to you.
Sr. No. Order No. Amendment No. Party AmendAmm Order Value.
1. PXZ/13/10015 I M/s. CHH DM 5,839,912 -Dt. 12/2/75 Dt. 26/4/75 West Germany.
II -i0- 0M 5,876,412 =Ot. 6/8/75
2. PXZ/13/10024 I M/a. L.&C SteirmullerDt. 29/t/75 Pt. 2/9/75 West Germany. DM 3,241,748 .
3. PXZ/13/10078 I We. Metall--ChemieDt. 22/4/75 Dt. 2/9/75 West Germany. DM 116,000 =
II -Dq 155,571 =Dt. 13/9/75
Kindly acknowledge receipt of the same and confirm that they arein order.
Thanking you.
Yours faithfully,
Y. TER AAER (EIA)DY. 4TRIALS MANAGER (EXPN.)
-2
1 -
- 4 -.-.
mae41. + a .:3 : x x - .x. -. x*- - -A -4 . I pa ea . m4 4. - .4
.- 4. -: - . .. s , + e - E W . -- . - - g g - - W : -y -
T
p 4 4,-
4x
Iii
L4'THE FER(TILIZER CORPORATION OF INDIA LIMITED
( GOVERNMENT OF INDIA UNDERTAKING)
(TROMBAY UNIT)TEUEGRAM*S: FERTILIZER MarvyIi, Chenbur.PHONE: 5Z 1451 BOMBAY 400 074,
Our Ref o. PXY/12/100086 Bombay, Dated the 25th Sept., 19 75.
n ernational Bank for Reconstructionand Development,
1818. H. Street, N.W,,Washington, D.C. 20433,
(Attn: Mr. E. Tortorelli)
(Industrial Project Dept.)
Sub : OuZ tender PXY/12/10008 and credit No. I4-481,
Dear Sir,
In connection with our above tender we are enclosing herewith following:
I, NIT2. Order Copy
Thanking you,
tours faithfully,
(B.P. GARODIA)DY. MATERIALS MANAGER(EXPN).
Encl s As above.
THE FERTILIZER CORPORATION OF INDIA LTD.
DURGAPUR DIVISION
E & HEAD OFFICE Please reply tof-43. SOUTH EXTN. AREA, PART 1 RING ROAD, WURGAPUR-7 L212
NEW DELHI-49 WEST ENGALGRAM'. FERTILIZER GRAM I DURFERT
PHONO: 62.6221 ( 3 line.)
REF. NO. DP:MM:EES:7002(R) DATED, THE... 2 t..1ma75
The International Development Association1818 11. Street,M.N. Wishington, D.C. 20433
Dear Sirs,
Sub: Modification of Durgapur Fertilizer Plantsunder Vorld Bank FinancinaScheme P.0.I.P.
We are sending herewith a copy of our Tender No.DP:M-f:EES:7002(R)dated 12th September,1975 issued by us for procurement of 2 nuybers ofCentrifukal Pumps under World Bank Loan (POIP) for information.
Thanking you,
Yours faithfully,for and on behalf of
TE FERTILIZTR CORPORATION Cr INDIA LINIIEDDURGA1UR DIVISICN
ASSTT., (p)Eincli As above
cc: Adviaer (Fertilizer)Ministry of &C, Shastri Bhavan, New Delhi ... Alongwith the set of enquiry
letter.
cc: OSD (Projects)F.C.I. Ltd., New Delhi *... -do-
cc: Comercial Manager,F.C.I. Limited, New Delhi .... -do-
/Dae)
INTERNATIONAL DEVEOPMENT ITERNATOL BANK FOR :NERNATIONA FINASSOCATION RECONSTRUCTIONANDDEVELOPMENT CORPORATION
OUTGOING WIRE
TO: FERTILIZE ORPORATION OF INDIA LTD DATE- SEPTEKBER 18/975
TROMBAY UNIT CLASS OF
SERVICE: 'TELE 11 27BCMB3AY
COUNTRY: INDIA
TEXT:Cable No.
FOR MR. DEBAKSI
FCI SENT TELEXZ ON SEPTEMBER 13 TO TORTORELLI SIGNED MATERIALS MANAGR
URFERT CONCERNIRG FCI REEREE DP.MM EES 7068 DATED 3RD JUNE. TELEX
UNGLEAR BUT PRESUME IT REFERS TO TROMBAY IV POIP DURGAPR PROJECT.
PLEASE CLARIFY AND IN ANY EVENT APPEAR AWARD AWNT IS TOO LOW TO NED
IDA M! APPROVAL. TORTORELLI IS AWAY ON MISSION BUT SUGGEST YU ARRANG
WITH HIM A UNIFORM REPORTING SYSTEK FOR PROCUREMENT UNDER POIP.
REGARDS
BROWNINTBAFRAD
NOT TO BE TRANSMMED
AUTHORIZED BY: CEARANCES AND COPY DISTR1BUTION-
NAME Don B ' x-6664) cs Messrs. Fuchs, Dewey, Tortorelli o/r
DEPT. Indus ri 'oj a 'ptomen
SIGNATURE4SIGNATUR OF JNDPIDUAL AUThORMED TO APPnoVE1
REFERENCE: DEBthm Fus L B m ai Se
ORIGINAL (File Copy)(IMPORTANT: See Secretaries Guide for preparing forn) Chocked for Dispac
ti FERTILIZER CORPORATION OF INDIA LIM TED(GOVERNMENT OF INDIA UNDERTAKING)
(TROMBAY UNIT)TLEGRA FT1LS
Marvali, Chmbur,PHOQNE: 5214 51 M CBOMBAY 400 074.
Our Ref. No. PUR/EXPWWB/30 Bombay, Dated the-Z SeCt. 19 75
B.P. GarodiaDy.Materials Manager(Expn.)
Dear Mr. Tortorelli,
Subject: Trombay IV Expansion -Submission of purchase ordercopies - AVS Class Pumps.
In continuation to our D.O. Letter No. PUP/EXPIWB/18dated 8 July, 1975, Kindly find enclosed Bid Summary
Recommendation Nr. 384 duly filled Quotation of successful
bidder and purchase order copy in respect of our orderfor AVS Class Pumps ordered on K/s Akay Industries, India
for favour of your information and record.
With Best Regards,
Yours Sincerely,
(B.P. Garodi
Mr. E. Tortorelli,Industrial Project Department,International Bank for Reconstruction
and Development.1818 H. Street*N.W. Washington, D.C. 20433,U.S.A
24842" IBR UR. 4M-a i s Z
RAL Aa oalas 1142. Dsr iuon APPndule st .1- ia su -t('E4#-~ ~ ~ ~ ~ ~~~~r A+ R 615 A uRaR lasW imbah E
HEsbek- Doa lalil0FRA~amP~gs
// & GARejvBIA i ZXAabluw Puasa EPsia
R&ftbaaIL P- I0Pa uR AIA~ m 41-1- &VBA/
46-1-1 RXR LIt AAuR OXb V&WL ARsa
LA tDDULCC APE+lub 9bR AL UGRZ Ff
NPLA+?o 27
440098 IBRO Ul
ITT 13/16 SEPT
AWA 014 CNY 964 CS 16/14
UIWA CO INCX 108
OURGAPUR ONE 108/102 13 1710
Sept.13, 1975 itrbton
Judastrial Proj.
MR E TO RTORELLI INDEVAS *
WASHI NGTONDCUSA
REFOURLET DP.MM.EES.?068 UATED 3RD JUNE SEVENTYFIVE
FOR COMPUTING AND HP SELECTOR RELAYS COMMA ENQUIRY ISSUED
TO SEVEN PARTI ESL AS PER APPROVED LIST AGAINST WHICH ONLY FOUR
QUOTATIONS RECEIVED STOP MESSRS TALYLOR INSTRUCMENT INDIAM
QUOTATION RECEIVED IN TIME WHILE OTHER THREE RECEIVED IN LATE~
DE/LATE/ELAY STOP WE PROPOSE TO PLACE ORDER
ON MESSRS IMPERIAL RIV ITALY AS THEIR QUOTATION FOUND TECHNICALLY
MOST SUITABLTE COMMA LOWEST PRICE Al RS. SIX THOUSAID ONE NUNDRED
CIF APPROX AND DELIVERY IS SEVEN MONTHS EARLIER FROM MESSRS
TAYLOR INSTRUMI.NT STOP
REQUEST APPROVAL FOR PLACING ORDEIMPERIAL RIV STOP
MATERIALS MANAGER UURFERT
&-Aliamah
ITT4/13 SEPT
ZCZC AWA984 VIA ITT CNY785 CS48/I
UIWA CO INCX 110
DURGAPUR ONE 110/106 12 1705 PAGE 1/>O
'&pt 12. 1975
MR E TORTORELLY
INDEVAS
WASHINGTONDC
REFOURLET UP/MM/ES/7002 BATED 14/3:75 STOP ENQUtRY
FOR BOILER FEED WATER PUMP AND TURBINE ISSUED TO THIRTY PARTIES
ASE APPROVED LIS TOP R tEIVED FOUR QUTATIOS STOP LOWST0
OFFER MESSRS KSB INDIAN AT' RS 3.48 LAKHS NOT ACCEPTABLE
ON TECHNICAL GROUNDB STOP SECOND LOWEST MESSRS SUtLERWEISE
CS48/13 PAGE 2/56
WEST GERMANY AT RUPEES 3*99 LAKHS FOUND SUITABLE BUT THEIR
CABLE OFFER POSTED ON 7TH MAY EC IVED ON 101 H MAY AG INST
OUR SCHEDULE QPENING DATEU ON 6TH MAY STOP 3RU LOWEST MESSRS
KSB WEST GERMANY COST RUPEES 5.07 LAKHS STOP REQUEST YOUR
APPROVAL FOR ACCEPTING SECOND LOWEST OFFER OF MESSRS
SULZERWEISE STOP
MATERIALS MANAGER DURFERT INDIA
INTERNATIONAL DEVELOPMENT INTERNATONAL BA F NRNAT) FINARCASSOCIATION RECONSTRUCTION AND DEVELOPMENT CORPORATION
OUTGOING WIRt
TO: FETILIZER CORPORATIONf OF INDIA LTD. DATE; EnV M 21975TRMAY NITCLA
BOMBAY SERVICE:=
COUNTRY: INDIA
TEXT:Cable No.:
FOR DEBAKSI RHYRTX SEPTEMBE 10. AalRElMlEWS TO EMiURSE APPLICATIORS
41-1-1 TO 48-1-1 ISSUED AND AIRMAILED SEPTEMBER 5 TO C0 ERAL AM
FOR PAMCENT UNlDER LEWTERS OF CREDIT. RBGARDS
PERRAX
NOT TO BE TRAMMtITD
AUTHORIZED BY: CEARANCES AND COPY DISTRIBUTION-
NAME A* erra* essr.ewShettyr/Tortoralli
DEPT Indus-trialP-o ects Espiritu (Ms,)Robbin (Ma.) F -530
SIGNATUR 1,119F Hamiliton (Me ) C--514(SIGNAT OF NDIVIDUAL AUTHORIZED TO APPROVE)REFERENCE: - Tromq IV - India For Us
ORIGINAL (File Copy)(IMPORTANT: See Secretaries Guide for prparing form) Checked for Dispetch
J
Septenber 12, 1975
FACTUdyogamndalCochin, India
Attention: Mr. C. Razanujax
Sub ject : Trombay Project of FCICr. No. 1181-IN (POIP)
Dear Mr. Ramanujams
In the absence of Mr. Tortarelli, I am acknowledgingreceipt of your letter of September h enclosing 2 copies ofP.O. No. 3002/7016 and Amindment No. 1 for the Brink MistEliminators. The award of this order to Monaanto Europe S.A.on a single tender basis was approved by us on August 8.
With kind regards,
Yours sinc e2y,
Anthony R. PerramIndustrial Projects Departnent
cc Messrs. Dewey/PerramShettyEspiritu (Ms.)Robbin (Ms.) (with 1 copy of P.O.)
September 11, 1975
Mr. S. G. DeBaksiChief Rgineer (a 1pn.)The Fertilizer Corporation of India Ltd.Bombay, India
Dear Mr. DeBaksi;
Rat Trombay Expansion IVCredit No. 481-IND
This is to acknowledge receipt of and thank you for yourletter of September 2 enclosing your Monthly Progress Report No. 15for the Month of August 1975.
Sincerely yours,
Ch une F. DeveyChief of Division III
Industrial Projects Department
cc: Messrs. Tortorelli, Shetty, Perram,
JNSoncini: ha
Distribution:
Industri~al Pojs a-Mr. Aalsbah
Sept 10, 75 Cont. Mr. Perch
LT4
-ia TS - ~ Pol
L849 xMm 0
FOR 0 TMM" INDSTRAL WACT KP.#Kf U
04PLM102 4-1-1TO 1-11- Wt M9 I I~t 00WTI
Form N.; 27(3-70)
INTERNATIONAL DEVELOPMENT INTERNATIONL BA N FNCASSOCIATION RECONSTRUCTION AND TION
OUTGOING WIRE
TO: FACT DEs975
UDYOGA4ANDAL CLASS OFSERVICE- TFJ1M F'ACT C 264
COUNTRY: INDIA
TEXT:Cable No.:
FCR RAMANUJAM. REURLET AUGU1ST 25 WE HAVE REWNE PROPOSED BIDDING
DOCUM~ENTKTIONS FOR TROMBAY POIP AND HAVE FOLLOWING COV24EN2r IN PARA 7
OF I91ORTANT NOTES R1EERENCE SHOULD BE MADE TO THE POIP FROJWST AND
NOT TO THE TROKBAY IV PROJE!OT. THE CORRESPONDENT CREIDIT AMOUNT 13
US$13 MIJLION INSTEAD OF THE US$33 MTUJIN MENTIONED. REGARDS
TORTORELLI
NOT TO BE TRANSMnrTE
AUTHORIZED BY: CLEARANCES AND COPY DISTRIBUTION-
NAME, E, Tortorelli cc: Mesr Dewey
DEPT. Indtustrial Projet Esiiu(s
Robbin (Me) - F530StGNAiiR(SFGNATURE OF INDIVIDUAL AUTHORIZED To APPROVE)
REFERENCE: E~wFrUeB omnain eto
ORIGINAL (File Copy) T/(IMPORTANT: See Secretaries Guide for preparing form) Checked for Dhwpatch:
THE FERTILIZER CORPORATION OF INDIA LIMITED(GOVERNMENt OF INDIA UNDERTAKING)
(TROMBAY UNIT)TELEGRAMS: FERTILIZER Marvali. Chembur.
PHONE: 52 1451 BOMBAY 400 074,
Our Ref. No.PXT/33/10046. Bombay, Dated the 19
Mr. E. Tortoreili,M/s. International Bank for Reconstruction
and DevelopMert ,1B18 H. Street, N.W. Washington,D.C. 20433,U.S.A.
Sub x pirt-hase Documents for 5 Nos?,'.W Greared Motors.
Dear Sir,
We send you enclosed herewith the following documents
on Purchase of Geared Motors required in the Product Handling
Section of our Trombay IV Expansi6n Project.
1. Purchase order PXT/33/10046 dt. 25-8-75
2. Format 384
3. Bid Selection
4. Bid Comparison
5. List of parties
This is sent to you for your kind reference and record.
Thanking you,
Yours faithfully,
(B.P. GARODIA)Dr. MATERJIAtS MANAGEP(E)
Form o, 27
INTERNATIONAL DEVELOPMENT INTERNATIONAL BANK FOR IEANAL FINANCEASSOCIATION RECONSTRUCTION ANDDEVELOPMN CORPORATION
OUTGOING WIRE
To: FERTILIZER CRPORTION OF INDIA LTD. DATE SKFTOER 4, I975
TRMBAY UNIT CLASS OFSERVICE: T QAPMl$02
BOMBAY
COUNTRY: INDIA
TEXT:Cable No.:
FOR IEBAKSI RERLET AUGUST 22. WE HAVE NO OBJETION AMUM RECIMUM)ATION
PE BID EVALUATION OF PU/12/10047 HAT ECHANERS TO RETA IUIGI AND
LARSE TOUBRO STOP REYRLE AUGUST 9 WE CONCUR REFLOATNG INQUIRI.ES FOUR
TANO/VESSELKS ORIGINALLY RECOMM1ENDED FCR AW&RD TO BRM15WE STOP
REGARDS
TORTOR1ELI
NOT TO BE TRANSMIMTED
AUTHORIZED BYV CLEARANCES AND COPY DISTRIBUTON-
NA"E E. TortorelliShetty
DEPT. Indugtrial PrectsMR. Robbir, - F530
SIGNATIRE Ma - IF1ton - 5.(SIGNATURE OF INDIVIDUAL AUTHORIZED TO APPROVE)
REFERENCE: FEspiritubw - Tr J.bay IV - Irdia Us. S
ORIGINAL (File Copy)(IMPORTANT: Se Secrtaries Guide for pepring fom Chocked forDipth
THE FERTILIZER CORPORATION OF INDIA L(GOVERNMENT OF INDIA UNDERTAKING)
(TROMBAY EXPANSION)Telegrams: 'FERTILIZER' BOMBAY-74. (AS)
BOMBAY-74. S.C. Do Baksi Phone: 52226752 145 1
General Project ManagerOur Ref. No. iqg)g',/g 2 &t I9*
Dear Mr. Tortorelli,
Trombay IV- Expansion -
Monthly Progress Report No. 15
I am enclosing herewith t Monthly Progress Report
No.15. We have included the items under instrumentation in
this month*s report. Pipes and Valves will also be included
from the next month.
Yours sincerely,
(S.C. De Baksi)
Mr. E.Tortorelli,International Development Association,Industrial Project Department,1818 H. Street N.W.Washington DC 20433. " OU.S.A.
Enc : As above.
G JILAIl ~O I1OITAE1O'1OD 5UXLJIT 5E HT(ZAIAATA3CJ0U A/Q" I J0 'iiWK!VOI)
( MOIZAA)X3 YAt OT )
I ~JI
*1I e2ze oT .xM i seO
a- nO nqx3 -VI ysdmoxT
di togeH aiepo q vIdfnoM
t Toqgp "aqTpoxq yLiffnoM %di rillwesd nl aIlons ma I
of nolistnemultanI -Iebnu a )$ i ezt bebu1anI qved 9W .01.om
bebulonl ed oels Ilbw aevlBV bns aeqlq .i2oqe s'd~nom alrf
.rinhom x en edi mo-d
1ylesaorde atuoY
(k,(8 .0 .Z. 2)
,no1ts1ooaa A ineaqoioveG isno JinetnI40 e i ntsqo0 'eG o- ,qx LIiitaubnl
.W.W testi .1-H 8f8l.CE,4 00 noopnldesW
.A. a. U
.svods aA t l3nS
- - ,. -s.. ..
- - ~ . I. - .. Dis ti buation:IIus 11B
L. 197~~5 SEP -2 AM 8: 28"u tria Proj 1/
11 (Telox lir.) Mr. AlisbahContr. Mr. Perch
7 1
L L 17
I J....
Form No. 27(370)
INTERNATIONAL DEVEt.OPMENT INTERNATIONAL BANK FOR INTERNATIONAL FNANCEAS50CtATION RECONSTRUCTION AND DEVELOPMENT CORPORATION
OUTGOING WIRE
TO: FRR'TTr'/R CORPORATION OF INDIA LTD. DATE 29 August 1975
TROIBAY UNIT CLASS OFASERVICE:
COUNTRY: INDIA
TEXT:Cable No.:
FOR GEEAL PROJECTS MANAGER. RSMTI AUG 28. APPLICATIONS 41-1-1 To
48-1 -1 NOT YET RiIv D. WH RECEIVED AND FUUND IN ORDER aDr
TO REDUYBURSE WILL BE ISSUED ACCORDINGLY.
TORTOTELL
NlOT TO BE TRANSM ffE
AUTHORIZED BY CLARCES AND COPY DISTRIBUTION:
ec; Messrs. Dewey/PerramNAME . TortoreUi Setty
Me. EspirituDEPT. Industrial Projects Ms. Robbin - F530
Me. Hamilton - C514SIGNATUJRE .SIGNATURE OF INDIVIDUAL AUTHORIZED To APPROVa)
REFERENCE: Flpritu:lp - Trobay IV - Incia NT By Canniions Scion
ORIGINAL (File Copy)(IMPORTANT: See Secretaries Guide far preparing form) Checked fr iNspatch:
29 August 1975
Fertilizers and Chemicals, Travancore Ltd.UdyogamandalCochin, India
Attn: Mr. C. Ramanu3amManager, Purchase & Inspection
Subjecti Trombay Expansion ProjectIIA Credit No. 4 8 1 -INPlant Operations Improvement Prograr, (poIp)
Dear Mr. Ramanujam
Thank you for your letter of August 9.
We or enclosing s.me sheets of our Form 3&, which should beacccaplished for all procuremnt over $200,000 under World Bank Finan-cing. This form should be Sent together with the bid evaluation andrecomiendation. Items 1 and 2 may be left blank and items 3 to 5should be filled out as indicated.
With kind regards,
E. Tortorelli
Enclosure
CC: Messrs. Dewey/PerramShetty
Ms. FApiritu
INCOMING CABLE
RCW-15 YWB305 RMH5643 KNY372 BIS559/28
U1N HL INPY 097
BOMBAY CHEMBUR 37/ 1 23 1740 PAGE 5/50 \2
August 28, 1975
LT TELEXNR24C423A Distribution:Industrial Pro jects
INTERNATIONAL BANK FOR RECONSTRUCT Mr. AlisbahCont. Mr. Perch
ON AND DEVELOOPMENT
1919H STREET
WASHINGTON- DC-20433 (
FOR 2 E TO TORELLI INDUSTRIAL PROJECT DEPARTMENT FROM S C DE
3AKSI GENERAL PROJECT MANAGER FCI TROMBAY EXPANSION BOMBAY INDIA
RE TROM1BAY IV CREDIT 431 IN KINDLY REFERE GOVEi"iIENT OF INDIA
M]INISTvY OF FIN ANCE LETTER ME F.55(C2)ECA(A)/75/AA-III DATED
COL LT TELEXNUR248 23A 013H WASHINGTON-DC-20433 431
F.55(32)ECA(A)/7 /AAA-III
EDS659/2 PAGE 2/31
16 AUGUST 1975 REQUESTING FOR ISSUANCE OF QUALIFIED AG EtENT TO
REIM'3UNSF IN RESPDCT OF APPLICATION NUMBER 41-1-1 TO 43-1-1
STOP PARTIES INSIS TING OR ADVANCE PAYMENTS STOP REOUEST ARRANGE
LSSUANCE STOP REGARDS
COL 16 175 41-1-1 43-1-1
SUPHALA OQEPW U0 INCOMING TELEXDISTRIBUTION:
248423B IB3RD UR /Industrial ProdectMr. Perch-Cont.
MSG E.202 2. .1975 11-03 AM IST
FRO1: GENERAL PROJECT MANAGER FERTILIZER CORPN OF INDIA LTD.,
BOMBAY INDIA mTJ
FOR: MR E TORTORELLI INDUSTRIAL PROJECT DEPTT. p.
IE: TROMAY IV CREDIT 481 IN
KINDLY REFER GOVERNMENT OF INDIA MINISTRY OF FINANCE LETTER E.
F.55(92)ECAA)/75/AA-III DATED 16TH AUGUST 1975 REQUESTING
FOR ISSUANCE OF QUALIFIED AGREEMENT TO REIMBURSE IN RESPECT OF
APPLICATION NUMBER 41-1-1 TO 49-1-1. PARTIES INSISTING FOR
ADVANCE PAYMENTS. REQUEST ARRANGE ISSUANCE.
REGARDS
OVER
248423B IBRD UR
SUPHALA 0113027(Telex No.)
Auust 26, 1975
Mr. A. K. MennChief (Manage.nt Rorting)
MH FOMLIM~ CORPORATEID OF INDIA LTDF-43, South ktansdin Area, Part -1Ring Read, New Delhi - 49India
Dear Mr. Men=
Res Nangal *ePwseion projectsCrsdit No. 357
credt No. 481
Thank you very ah for your letter of July 2), enclosingquarterll Financial Statuants - Profit & Low Aesunt and BelanceShoot for the Quat ended 3th Jne., 1975 in respect of Trom4 Unitand agal Unit.
sineely YMW 8,
Chaumey 'F. DeweyChief of Division III
Industrial ProJects Department
ct: Messrs. Tarnaviecki, Bromn, Perrm, Ferber
JIMoncinii a
CASLE FEDO
MPHOII QOCHIN
TE . FACT - CN -164
FACT ENGINEERING AND DESIGN ORGANISATION(A Division of THE FERTILISERS AND CHEMICALS, TRAVANCORE LIMITED)
C. RAMNUJAM Y GAMANDAL
MIANA GER, PURCHASE & INSPICTION UDYOGAMANDAL
A2-'%g/ 6 3 AIR MAIL Dae ..... 19.75
.Ar. E. Torterelli,Industrial Projects lepartment,International Bank for Reconstruction
and Development,1818 H. Street, N.W.,Washington D.C.20433 (U.S.A.)
Subs Trombay Expansion Project of The Fertiliser Corporation
of India Ltd. - IDA loan/'Cedi . 1- - 1P ----
Dear Mr. Tortorellis
You might bw aware that the above IDA Credit has been sanctioned for
the Plant Operations Improvement Programme coming under The Fertiliser
Corporation of India Ltd. for their plant at Trombay. FACT Engireering
and Design Organisation has been awarded a turn-key contract by FCI Ltd.
Trombay for this portion of the contract. I am enclosing herewith the
followings
1) Request for Quotation21 Ittachment No.1 - Terms & Conditions of Purchase - 4 pages
3 Attachment No.2 - Instructions to Bidders - 4 Pages
4 Proforma of performance bond/bank guarantee for performance
I shall be grateful if you would go through above and let me have
your commenta, if any, so that we can start issuing enquiry notioes.
With regards,
Yours Onoerely,
(C. 1 UJAM
Eno3.. 4 IJ(
F~nN.27
INTERNATONAL DEVELOPMENT INTERNATINAL BANK FO INAICEASSOCIATION RECONSTRUCION AND DEEOMETCRPRON
OUTGOING WIRE
TO: FERTILIZER CORPATION OF INDIA LTD. DATE: 25 AUGUST 1975
TRWHRAY UIT CLASS OFSERVICE: TlEU6-11IMT-
COUNTRY: INDIAE
TEXT:Cable No.:
FCR DEBAKSI. NO OBJECTION TO PLACIM% MDIER WITH McNALLY MARATr ENclo
FOR ROCK GRIM4G UNIT PX/12/10041 BASED ON BID EVLUATION.
REGARDS
SHETTY
NOT TO BE TRANSMIE ID
AUTHORIZED BY: " - 4 CLEARANCES AND COPY DISTRIBUTION:
----- - c: Meaers. Pezra. TortorelliNAME .T. eity EM
DEPT. Infttria Pro~cts eparmentRobbin (M)- F530DEPT. ID~dUtr~A Fr octa slg
SIGNATURE(SIGNATURE OF INDIVIDUAL AUTHORIZED TO APPROVE)
REFERENCE: F2spiritBu/p - Trobay IV For ise By Cosunications Section
ORIGINAL (File Copy)(IMPORTANT: See Secretaries Guide for preparing form) Chocked for Dispetch,
INTERNATIONAL DEVELOPMENT INTERNATIONAL BANK FOR INTERNATIONAL FINANCEASSOCIATION RECONSTRUCTION AND DEVELOPMENT CORPORATION
OFFICE MEMORANDP ,ITO: Mr. M. Singh DATE1-ijt21 9?5
FROM: Karl H. Wille
SUBJECT: INDIA - Credit 481-IN, Trombay IV Fertilizer, andCredit 427-TN% Calcutta Urban Development Project
Attached please find the following for your records;
(a) A cover letter from Mr. Gupta, dated August 5, 1975, forwardinga confirmed copy of the Association's letter, dated July 11, 1975, amend-
ing Section 2.06(b) of the 1 est Bengal Agreement to the Calcutta UrbanDevelopment Project, Credit 427-IN (also attached); and,
(b) A cover letter from Mr. Sarma, dated August 8, 1975, forwardinga confirmed copy of the Association's letter, dated July 23, 1975, amend-ing the Project Agreement of the Trombay IV Fertilizer Expansion andPlant Operations Improvement Project, Credit 481-IN (also attached).
AttachmentsKRWillen:aocc: Messrs. Dewey, Bohr
Mrs. Hamilton (o/r)
i:
elegraphic Address I M R RTEEnglish i FE:rTIiZER -HONE
THB FERTILIZER CORPORATION OF INDIA LTD.CENTRAL OFFICE
Rgistered Ofi..F-4 SOUI H EXiENSION Ar.7,*,
~"NG ArAD, .EW DEL H -l 4
ai re2.L. m S. Daed..uzzgInst~*i9.15Da
International Development Association,1818 H Street N.V.,Washington D.C. 20433
(Attention: Mr.lilliam Diamond, DirectorSouth Asia Country Programs Deptt)
Dear Sirs,
We thank you for your letter dated 23rd
July, 1975, amending the Project Agreement - Credit
No.481.IN. As desired by you, one espy of your
letter is returned herewith duly signed by our
Managing Director.
Thanking you,
Yours faithfully,For and on behalf of
THE FERTILIZER CORPORATIOj3 OF IND411A LT
(K.-. Sarma)Officer on Spl.Duty(Projects)
INTERNATIONAL DEVELOPMENT ASSOCIATION
1818 H Street, N W., Wa hington, D. C. 20433, U sA-
A-C.&202 -TA . EX. i.3-636 - C.6I.AdAne. -INDEVAS
July 23, 1975
Fertilizor Corporation of IndiaF-34 South Lxtenaion Area Part IRing Road
Ie Delhi 49IDIA
De-ar Biro:
Subject: Credit No. h81-I(jLxnciient to lroject reemenv)
Plel e refer to Section 2.09 of the ?rojoct !grccent (roMrbryIV Fertilizer iv:csion nd P1,.t CertionS Wfr vemnt Project) betleenus dated Jirno 19, 1974. :n vic o. te 6 rn ci c rctst-ces ffoctingthe world rppa.y of i-1onia, we ,ir-e t .t th or.ay V project shouldnot be brought into cc-: tinin cr-,cl im t e 'iIe Schedrle dLted1 :-y 1L, 147, :-roved b:v the .1rocition. A.cordin'ly, it ia propozedth'-t the Project grecm t be s Xa ollo-s:
(a) By deletion of Section 2.09 of the Project Agreernentjand
(b) By ronu-Iering the eubIeouent Section= in Article IIof the Project tirec.ent.
Plc-se idicn ate your n th t foregoing by sigiingthe fom of confira' tion on the attached copy oi this lotter anidreturning it to us.
Very trul: -ours,
ITLElIO AL L I. M djILTI0ON
South Asia Countrj ir:gim Dopart nt
Frti or Corporation of IniCt
b y A , - -
August 1), 1975
Mr. 5. G. Deskmic~hier AMen~e (spa.)T.hw rfttier- carporaton of India L.td.Bombog, India
Dear Mr. Dotkka:
?,el nvmbay w IVCredit No. UM-IND
Tie Is to acknmwlmdq* receipt of and thank yme for ymmr-ettor of Augurt 4 onclosing your Ynftblr Pro- 's Rqprt so. 14
for tN Xmt& of July 1975.
Jinoiely yvare,
Chief of Divinimn IIIIndmstrial Pmaceto Dopwrtomet
Ott fma&s Twrtorali, Fhott, ParSm
Jasoncinau ba
No,
INTERNATIONAL DEVELOPMENT INTERNATIONAL BANK FOR INTERNAIIONAL FINANCEASSOCIATION RECONSTRUCTION AND DEVE.OPMENT CORPORATON
OUTGOING WIRE
TO: FERTILIZER CORPOATION OF INDIA LTD. QATE: A 1y7
THROMBAY UNIT CLASS OF LSERV Q5
BOMBAY
COUNTRY: INDIA
TEXT:Cable No.;
FOR DEBAKSI. REURLET EXPN/1(59)/75/2277 AUG 7 WE HAVE NO 0JECTION TO
PRICE ANGE DE TO SPECS REVISION BFW TRFATMENT PLANT.
TORTORTLIT
NOT TO BE TRANSMETED
AUTHORIZED BY: CLEARANCES AND COPY DISTRIBUTION:
ce: Mesars. Perram, ShettyNAME E. Trtoralli E
Robbin (M) - F530owr. Indutria P2'~eotHamtilton (Ms -C51
SIGNATURE
REFERENCE: DpiV u p-
ORIGINAL (File Copy)(IMPORTANT: See Secretaries Guide for preparing form) Chocked for Dispatch.
S. C. DE BAKSIee. C E Manager The Fertilizer Corporation of India Ltd.
Trombay ExpansionBombay-.400074.
No. XpD/(4)/f3 14th Aagust, 1975.
Dear Mr. Tortoreoni
This is to acknowledge receipt of your letter of Jme 25, 1975.- wOuld thank you for your ppreciation for the report that we arecmpilin g SWOZ month for the purpose of mnag mnt control. In theprogrss reporb for the month of June, we have incorporated anomherfeature of reporting the Physical progress of the civil work which is
now in progres. You have indicated the figure of 611.6 million ofrees iA the revised capital Cost for Trombayh.i the usual BanktffOrst* However there is a little change in the final figures thatha now been worked out. The o ative figure will be no 637.0 a ilionrupees Both these figures are excluding the Cost of the boiler'2. HoweVer, I may mention bore that in the original tateimant tothe World Bank, Revision No.-4 'Of 11-4-1974 a su of Rs. 18.8 millionwas provided for the cOst Of Steam, Generation Pl.at. Therefore thecomparable figure of 637 mi3lies rupee samt to Rs, 460.2 millioninstead Of Ba .479 m31lion.
S However, you have correctly appreciated our difficaty inreporting the chan of cost estimate in the monthly progress reporttill thed GOvrMat of India approves the revised estimate. Therevised estimte, are being saamitted to the Govorment o oCentral Office, for their approval. I hope we will be able toincorporate the change in the Cost estimate within a short time.I therefore, request that you may kindly bear with us,
With kind an best personal regards,
&al: Revised Capital Estimate. .OUr sinceely
r(S C. Do Baksi)Industrial Projects Depart.ent,International Bank for Reconstruction and
Devalopment*1818 H street, NW,,WISITNGTON D.C..2433,
je ab M 5
- - . EO
-x -. - - - + -
- - . r
.x - - r- - -4-
x' + ~ - -4 ---
* - .c -s -
4 - -4 --
x 4 -i--'-- -
-- x4x--.- --- 44-4
- ... * -4
x -4.-.-- - x -- - - . 4 4 x -
TROKWA IV EXPANSION PROJECTCAPITAL COST ESTIATE
(a.Mi I.ion)
Revised Trcibay EstimateAs of July. 1975
zaipuet and Supplies ..... ..... 250.90
Spares .... ..... 27.56Freight, HardUdng, Charges
Duty and Taxes .. ..... 109.05
Licence Fees, Engineering & Design ..... ...... 3445Erection & Commissioning ..... ...... 35.52Project Management & Training *se.. ...... 14.00Civil Works ..... ...... 73.30
Sub-total .-.. ...... 544o78
Initial Working Capital .4... ...... 35.00Contingencies: Physical ..... ...... 10.o
Ezployeest Housing Colony ... g **e... 4.50
Total Project Cost .. 44 ....-- 594.28
Interest During Construction ..... ...... 42.49
TOTAL FINAEIKG REUIRED ..... . 0.... 636.77
Say ..... 637
INTERNATIONAL DEVELOPMENT INTERNATIONAL BANK FOR ILFASSOCIATION RECONSTRUCTON AND DEVEIPMEW C ION
OUTGOING WIRE
TO: FETILIZER CORPORATION OF INIA LTD. DATE AUGUST 1- 1975TROMBAY UNITBOMBAY CLASS OF TELEX: 113027
.EVIE Ext. 6666
COUNTRY: INDIA
TEXT: FOR DEBAKSI. REYRTEL AUG 1 BID DOCUMENTS RECEIMD A WE HAVE NO OBJECTIONCable No.:
TO AWARD CONTRACT FOR PRODUCT HANDLING SYSTEM TO ELECON ENGG.
REGARDS
TORTORELLI
NOT TO BE TRANSMITED
AUTHORIZED BY; CLEARANCES AND COPY DISTRIBUTIONco: Messrs. Perram# Shetty
NAME E. Tortorelli Espiritu (Ms)Robbin (Ms) - F530
DEPT Indust;|L_ Projects Department Hamilton (M) - c514SIGNATURE
(SIGNATURE OP INDIVIDUAL AUTHORIED TO APPROVEREFERENCEZ
REEEC: FEspiritu/om - TROMAY IV - INDIA Fo Lim ByCmncll eto
ORIGINAL (File Copy)(IMPORTANT: See Secretaries Guide for preparing form) Chocked for D19patcK-
rtrForn No,2
INTERNATIONAL DEVEIOPMENT INTERNATIONAL BANK FOR INERNATIONALFNANCEASSOCATION RECONSTRUCTION AND DEVELOPMENT CORPORATION
OUTGQING WIRE
TO: FRTILIZER CORPORATION OF INDIA LTD. DATE AUGUST 8, 1975TROMBAY UNITBOMBAY CLASS OF ZQnsMh,-WeGf
SERVICEExt. 6668
COUNTRY: INDIA
TEXT:Cable No.; FOR DEBAKSI. RE BRINK MIST ELIMINATOR NO OBJECTION TO PURCHASE FROM
MONSANTO BELGIUM ON SINGLE TENDER BASIS.
REGARDS
SHETTY
NOT TO BE TRANSMTTED
AUTHORIZED BY+: -CIARANCES AND COPY DISTRIBUTION:
c Messrs. Perram* Tortorelli-o/rNAME Y. T.Shetty Espiritu (Ms)
Ms. Robbin - F530DEPT. Industrial Projects Da etme s. ni I - 51
SIGNATURE(SIGNATURE OP INDIVIDUAL AUTHORIZED To APPROVE)
REFERENCE FE rit/ - Tbay IVtio
ORIGINAL (File Copy)(IMPORTANT: See Secretaries Guide for preparing form) Checced for Dispatch:
THE FERTILIZER CORPORATION OF INDIA LIMITED(GOVELtNMENT OF INDIA UNDERTAKING)
(TROMBAY UNIT)TRAM FRIUZRrva, Chmbur
PmONE : 5 2 1 4 5 U BOMBAY 400 074.
Our Ref. NoXT/337/10007. Bombay, Dated the 5th August, 75.
Mr. E. Tortorelli,Internationak Bank for Re-Constructiong
& Development,1818 H. Street, M.W. Washington,D.C. 20 433,
Sub i Purchase documents for Cast Iron MotorControl Centre in Bagging Plant.
Dear Sir,
We forward herewith the following documents for your kind
information and record on procurement of 2 Nos. C.4. Motor Control Centres
required in the bagging plant of Trombay IV Project.
1. Purchase Order - 2 copies
2. Bid Summary
3.- Bid election
4. t 364
5. List of parties
6. Bid Doctmentd
Kindly acknowledge,
Thanking you, Yours faithfully,
D(B. Mai IAa)Dy. Materials Manager(Expn).
THE FERTILIZER CORPORATION OF INDIA LIMITED(GOVERNMENT OF INDIA UNDERTAKING)
(TROMBAY EXPANSION)Telegrams: 'FERTILIZER' SB o SakB. B Y4. (AS)
BOMBAY - 74 : 522 267General Project anager* 52451
Our Ref. No. Expa. 1(59)5/7/ (1i 4th August 19 7 5
Dear Mr. Tortorelli,
Trombay IV - Expansion -
Monthly p~rogess Report No. 14.
I am en'eosing herewith the Monthly Progress Report
No. 14. The report now includes the chart showing the constru-
ction progress also. Though the procurement action has been
taken for instruments, valves, pipes and pipe fittings, these
are not reflected in this month's report. We are developing 47
system to include these items also in the annexure showing
material procurement status. The system is expected to be ready'.,
by and of Aug. 1975.
With regard.,
Yours sincerely,
(S.C. De Baksi)
Mr. E Tortorelli,International Development Association,Industrial Project Department,1818 H.StreetN.W.Washington DC 20433.U.S.A.
Encl : As above.
EUCI : y% apA
MseSpU'Oou DC 50433'I18e H*246rOwM'Iuqpn.19igT bZoQsC; DebLgU;
, IufG.Lug you9 T DeAS1bWqu; yOSOcT1;1uQULP* E OtoO61W
(z'c' Dr- 13,jel)
AOnlze 8iuceLeJ)a
pA Ouq Ot ynal yAp*
ws5;r-rqT bYocflLOu. ahuene' IJJS *af,;. y exbeceq ;o pa LeqA
* Ase. ;emo yucing. ;pees.P i9TOo Tu p6 9UXILS ePOATUIirs uo; L7,sc;sq IU pe1? WW;Pu e ebOX;- M 9L4 qG6AkbObjUI3
pSpOU JOz ru2;LunUseb ATAse& btboe quq bjob e;jjtu& ;p~ee c-cOIoU b.o& e e - .pon1p ;po bxocnha 3csu; lgu;ou p c p6u Cr 1
190* LP Gj r.bo; UOM pJCTI14$& ;PG CYSLg OpOIjUa $PG COUW;f-
I qw sucroeTu8 psxeaT;P 4p, wOUSpA bzoaLea gbooL;
LOWIpA IA - EXb,ueou
DG9Z XL' 1OT;Omr- i i
CAP1Il'" xbo* W(6 M T70*
a*1xzej bloec; %,quqdrw 3i 4i(1UQ4 s6 o7(w~ ee: pJa'C' as FeiT -nr somA (v2)
(JMBVA EXbVI~tIOM4
(co mm1EL1I C. Io D nvflDE '
IHE E~iL~IFES COBiLOBV IOV1 Oh. MIDIV FWVALED
Teerph:a dri;Engbish :FERTILIZER TEE CIND:^:9Wde 1TELEX FCN:as
'2p, EPHONE 62622
THE FERTILIZER CORPORATION OF NDIA LTD. tCENTRAL/OFFICE
1k8 WdER Z.f qT f tA.K. Ilonon 1-M
Chief (Management Reporting
71 ~ ~ 9 RNG IOp A,
Rot. NG N o .................Dated . -... t97
Dear Mr. Dewey,As you are aware, annual financial statemtts for
BCI as a whole and for the four World Bank aided projects
are to be sent to you within 4+ months of the closing of
accounts i.e. before 31st July every year. In this connection
we have to inform you that the provisional financial statements
for 1974-75 in respect of the 4 units i.e. Sindri, Nangal,
Trombay and Gorakhpur have already been sent to you. The
annual financial statement as at the end of March,1975 for the
Corporation as a whole would be slightly delayed and we hope to
end 4ihe wzme by 1i6h Augt,97.. This ifr your irnati"-
With regards,
Yours sincerely,
(A .K. Menon)
Mr. C.F. Dewey,Chief of Division III,Industrial Projects Department,International Bank for Reconstructionand Development,1813 H. Street 1.W. Washington,D.C. 20433, . A.A
249423B IBRD UR.D-4
24S423B IBRD UR
248423B IERD UR
SUPHALA 0113027 (Telex iNr.)
TRANSMITTED ON $TH AUGUST DELAY DUE TO UNGET
MS 112 1.8.1975
FROM: MATERIALS MANAGER (E-XPNI) FERTILIZER CORPN OF INDIA LTD.p
BOMAY INDIA
TOt IBRD WASHINGTON
ATTNs MR E TORTORELLY.
KINDLY NOTE WE HAVE AILED ON 29TH JULY 1975 FOLLOVING DOCUENTS
FOR WORKS CONTRACT ON PRODUCT HANDLING SYSTEM OF BAG#GIN PLANT IN
OUR TROMBAY EXPN. PROJECTs
1) BID SUMMARY
2) BID SELECTION
3) FORMET 584
I I SET EACH OF QUOTATION RECEIVED
5) BID DOCUMENTS
6) LIST OF SUPPLIERS
7) LETTER OF INT+ INDENT
THESE PAPERS ARE SENT TO YOU FOR YOUR SCRUTINY AND RECORD.
KINDLY ACCORD YOUR APPROVAL TO OUR PROPOSAL AS PER COMMITTEES
RECMMENDATIONS. SINCE THE VALIDITY OF PARTY'S OFFER WAS EXPIRIOI
ON 25.7.75, WE HAVE ISSUED A CONDITIONAL LETTER OF INDENT ON
WIS ELECON ENGS CO LTD., INDIA. THE LETTER OF INDENT SKALL BE
TREATED AS CONFIRED ONLY AFTER OBTAINING YOUR APPROVAL TO IT.
REQEST REPLY BY TELEE SO THAT CONFIRM ORDER MAY BE RELEASED 0+
IN FAVOUR O WS ELECON ENGG CO LTD.
OVER
THE FERTILIZER CORPORATION OF INDIA LIMUIT(GOVERNMENT OF INDIA UNDERTAKING)
(TROMBAY UNIT)TELEGRAMS: IFERTILIZER Marvali, Chembur.PHONE: 521451 BOMBAY 400 074,
Our Ref. No. Bombay, Dated the Z 91,
U.XSJA. a'0DUR.3-
FRON: L.M. (MN.), F.C.I. LTD,, TROM3AY UNIT (.)
3: MR. E. TORTORELLY. IMD WASHINGTON, U.S.A.
KITDLY NOTE WE HAVE MAP R -9 FOLLOWIlNG DOCUWUTS FOR WORKSCONTRACT ON PRODUCT HA1DLING SYSTEF, OF BAGGING PLANT IN OUR
TROMBAY EXPN. PROJECT(.)
1) BID SU"ARY.
2) BID SELUTION
3) FOEVET 3844 ) 1 SET EACH OF QUOTATION RECEIED
5)BID DOCUMT
6) LIST OF SUPPTIERS
7) LETTER OF INENT
THESE PAPERS ARE SE0T TO Y)U FOR YOUM SCRUTI'1Y AND RECORD (.)KINDLY ACCODII YOUR APPROVAL T OUR PROPOSAL AS PER COVITTEE
RLEC ENDA- I 'INS (.) SINCE TE YALIDITY OF PARTV T FM'' AS
XPIRIG ON 25.7.75, W HA'J ISSUD A CONDITIONAL LETT OF INDENT
ON -/S. ELECON MNGG. Co. LT3., INDI .) THE 1ETTEM OF I DENT
SHALL BE TREATED AS W CO FIRamPNLYOBTAINING YOUR APPROVAL TO IT C.)REQUEST REPLY BY TEL 30 TTAT COITrM 0DER *AY 3E 1RE-
IN FAVOUR OF M/S. EL CON ENGG. CO. LTD.(.)
P /33/10036 Dates-29th July 75.
C..Tot-1 11
Xr. E. TortorelliInduttrial Projects Department,International Bawl for Reconstruction
and Develbpment1818 R. Street, N.W.1Wnshington D.C. 204+3 ,U. S.A.
(M.l 11a ik )Asstt. Project Engg. (Expn.)
INTERNATIONAL DOVELOPMENT INERNATIOtNA BANK O I FNANCEASSOCIATION RECONSTRUCTION AND DEVELOPMN CORPORATIO
OUTOING IR
T'FERTILIZER CORPORATION OF INDIA LTD DATE JULY 28,F 1975TROMBAY UNITBOMBAY CLAOF
SERVICE:
COUNRY:. Ext. 6668 L
CNTRY NDIA
TXT: FOR DEBAKSI. TROMBAY POIP. REYRTEL JULY 26, NO OBJECTION FOR ORDERCable No.:
PLACEMENT WITH MONSANTO FOR MIST ELIMINATOR FOR SULFURIC ACID PLANT.
REGARDS
SHETTY
NOT TO E TRANSMITED
AUTHORIZED BY: CLEARANCES AND COPY DISTRIBUTON:
eo: Messrs. DeweyNAME Y. T. Aetty Perram, Tortorelli-ofr
Espiritu (Ms)DEPT- Industrial Projepts Department Robbin - F530SIGNATiRF
(SIGNATURE OF INDIVIDUAL AUTHORIZED TO APPROVe)REFERENCE! YShetty/om . TrombaG IV For Use Cm ions Secion
ORIGINAL (File Copy)(MPORTANT: See Secretaries Guide for preparing form) Checked for Dispatch;
248423A IBRD UR
SUPHALA 0113027 (Telex Nb) INGOOIG TEMEI
Distributia:I7mwmr Pojectao*Mfr. Alisbah
MESSAGE NO 226 26-7-1975 2.10 PM .
FOR INTERNATIONAL BANK FOR RECONSTRUCTIOW AND DEVELOPMENT
WASHINGTON
ATTN MR TORTORELLI 7 k
WE HAVE FORWARDED TODAY FOR YOUR APPROVAL OUR PROPOSAL TO
PLACE ORDER OF MIST ELIMINATOR FOR SULPHURIC ACID PLANT
MODIFICATION FINANCED BY I D A (POIP) WITH MESSRS. MONSANTO
EUROPE, BELGIUM FOR A VALUE OF DOLLARS 61,000/- ON SINGLE
TENDER BASIS. OUR CONTRACT WITH THE ENGINEERING CONTRACTORS
MESSRS. FACT STIPULATES PROVISION OF BRINK MIST ELIMA+
ELIMINATOR IN THE PLANT, WHICH IS MANUFACTURED BY MESSRS.
MONSANTO. AS THE VALIDITY OF THE QUOTATION IS EXPIRING ON
31ST JULY 1975 WE REQUEST YOUR TELEX APPROVAL IMMEDIATELY.
BID ENQUIRY, QUOTATION AND BID EVALUATION HAS ALREADY BEEN
FORWARDED BY POST.
REGARDS
-- DE BAKSI FERTILIZER TROMBAY EXPANSION BOMBAY --
Fa~ o -R27
INTERNATIONAL DEVELOPMENT INTERNATIONAL BANK FOR INTERNATIONAL INANCEASSOCIATION RECONSTRUCTION AND DEMLOPJ9aNT CORPORATION
OUTGOING WIRE
TO: FERTILIZER CORPORATION OF INDIA LTD. DATE; JULY 25, 1975TRMBAY UNITBOMBAY CLASS OF
SERVICEFa.6666
COUNTRY: INDIA
TEXT: FOR DBAKSI. REYRLET JULY 18, BASED ON INFORMATION PROVIDED NO CMESCable No.:
ON RELEASE OF PURCHASE ORDER FaR TANK/VESSELS TO LARSEN AND TOUBRO STOP
REYRTEL 217 JVLY 25, NO OBJECTION TO RLASE OF PURCHASE ORDER FOR BW
TREAMNT PLANT TO IAEC STOP RE PU/12/10054 CRYSTALLIZSa BID SMKAR
REVIEWED AND HAVE NO OBJECTION TO AWARD CONTRACT TO LUIGI RESTA.
REGARDS
SHETTY
NOT TO BE TRANSMMTTED
AUTHORIZED BY: CLEARANCES AND COPY DISTRIBUTION:cc: Messrs. Fuchs
NAME Y. T. Shetty DeweyPerram, Tortorelli-o/r
DEPT. Industrial Proj ecta Department Espiritu (Ma)Robbin - F530
SiGNATURE
REFERENCE: e pUPROVEF
ORIGINAL (FilIe Copy)(IMPORTANT: See Secretaries Guide for preparing fornm Checked for Dispatch:
#T English : ERTIUZER I t ritW -;Teimrmpc Address !PHONE: 62*221
THE FERTILI R F IND A DCE
- e ) re
I.43. SOUTH EXTENSION AREA FAR
IktNG FOD NEW DEL.HI 49
ReL No. 03/30/ 9i
Chief of Division IIIIndustrial Proiects Departmient,International Bank for Reconstructionand Development,1818 H. Street,, N.W, WashingtonDC 20433, U.S.A. -
Dear Sir,-
End please find herewith quarterly financial
statement Profit & Loss Account-and-Balanee S-heet-for
the quarter ended 30th June,1975 in respect of Trombay Unit4,ee
Yous faithfulj,for and on behalf of the
Fertilizer Corporation of India Limited,
- .. Chie f(management Reporting)
Encl: s stated.
JNITS IwD.ki (SHAR : NAYA NANGAL PUNjAC): TROM.EAY f4AHARASHTRA GOkAKHPUR (U, F NAM-RUP (ASAMIDIVISIONS P & D DIV. SINDrI: DURGAPUR' W B., BA AUNI (BIHAR). RA AGUNDAM fAN-DHRA) TALCHER CFU6SA) KOREA tM P1 -SALD AIVW.F'
B C 3. ESPLANADE FAST. CALCUTTA & PRASHUKUNi, .Pr'rAR 'OAD. BQ'!AY
INCOMING TEIE/A I
MESSAGE NO 217 25-7-1975 ( r
FOR INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT
WA SH IN G TO N DistributiOl Industrial ProjectsMr. Alibah
ATTN MR TORTORELLI e
KINDLY REFER OUR LETTER NO. EXPN/1(59)/C/75/1718 DATED
27TH JUNE 1975 REGARDING PURCHASE RECOMMENDATION FOR BOILER
FEED WATER TREATMENT PLANT. SINCE THE VALIDITY OF THE OFFER
IS EXPIRING TODAY, WE ARE RELEASING LETTER OF INTENT/PURCHASE
ORDER TODAY IN ANTICIPATION OF YOUR APPROVAL.
WITH REGARDS
// S C DE BAKSI FERTILIZER TROMJBAY EXPANSION BOMBAY//
MSG OVER
PLACK+70
248423A IBRD UR TIME 6.19 PMO
248423A IBRD UR
SUPHALA 0113027 (TEIEx NO)
248423A IBRD UR MNOOMING TELEV VO
S UPHAL A 0 113027 (TEIEX NO)0i4rib ion: Industrial Proj ects
MESSAGE NO 216 25-7-1975 Mr. Alisbah
FOR INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT
WASHINGTON C C
ATTN MR TORTORELLI
KINDLY REFER TO OUR TELEX NO. 191 DATED 17-7-75 AND OUR LETTERW
NO. EXPN/1(59)/C/75/1963 DATED 18TH JULY, 1975 REQUESTING YOJR'
APPROVAL ON OUR REVISED RECOlM1ENDATIONS FOR DESIGN, ENGINEEIN&
AND FABRICATION OF STAINLESS STEEL TANKS/VESSELS. IT IS
REQUESTED THAT YOU MAY KINDLY SEND YOUR APPROVAL EARLY SO THAT
WE MAY RELEASE ORDERS IMMEDIATELY AS THE VALIDITY OF THE OFFERS
EXPIRE ON 31ST JULY 1975 FOR LARSEN AND TOUBRO AND 7TH AUGUST
1975 FOR BRONSWERK.
WITH REGARDS
// S C DE BAKSI GERTILIZER TROMBAY EXPANSION BOMBAY//
gish : FERTiUZER TELEX :C NO 2859TregrTpeC AddTess PHONE :2622
THE FERTILIZER CORPORATION -F-tND1ALTD.CENTRAL OFFIC
f3SCUTH E<TENSiN AREA FA,7
RiNG POAD. NEW DE -l 49
Re.N. 41AMC/03 /3 0/ Wi524th July,..........~~~~........ ......... ..................... . ............. "7
Mr. C.F.Dewey,Chief of Division IIIIndustrial Projects Department,International Bank for Reconstructionand Developient,1818 H. Street, L'.W, Washington,
DC 20433, U.S.A.
Dear Sir, C-
Uncloged please-find herewith quarterly financiAlstatements- - Profit & Loss Account and Balance Sheet forthe quarter ended 30th Jme,19-75 in r.spect of Trombay Unit '
Yours faithfully,for and on behalf of tho
Fertilizer Corpor -tion of India Lira tcd,
( A .K. iMCnOnl
Chie f (M nagemcnt Reporting)Encl: As stated.
UNITS V 'o, ' N A ANCAL pU, : TRA A MA &SiA. TRA .,.cp (U. d t : P A SAMID1I,1SION'. t . ~-- r , -, ,~ A 1,"~ P -,A .; I . '
NTERNATIONAL DEVELOPMENT INTERNATIONAL BANK FOR INTERNATIONAL :FINANC
ASSOCIATION ANDDVEtOPMENT CORPORATION
OUTGOING WIRE
To' FERTILIZIE CORPORATION OF INDIA LTD. DATE JULY 23j, 1975TROMRAY UNIT / 30-17BOMBAY CLASS OF TEM B-+"E08R
SERVICE:Ext. 6668
COUNTRY: INDIA
TEXT: FOR DEBAKSI. REYRTEL 174 JULY 16 WE HAVE REVIEWED BID SUMARY PACKAGE FORCable No.:
TWO 3CKVA 22/11 KV TRANSFOMERS AND HAVE NO OBJECTICN TO CONTRACT AWARD TO
PAUWELS TRAF0 STOP WE HAVE NO COMMENTS CONTRACT AWARD COOLING TOWERS
FIZ/13/10061 TO PAHARPUR.
REGARDS
SHETTY
NOT TO BE TRANSMff TED
AUTHORIZED By! CLEARANCES AND COPY DSTRIBUTION:cc: Messrs. Fuchs
NAME Y, T. , hetty Dewy-- Perram., TortoreLli-o/r
DEPT. Industrial Projects Department Espirit (s)Robbin (Ms) - F530
SIGNATURE
REFERENCE: (SI WIT " IDU1, 14 70 APPROVE)
ORIGINAL (File Copy)(IMPORTANT. See Secretaris Guide for preparing form) Chocked for Dispath
JVr 23, 1975
etawliftw copefttLt of IaNUAY-34 st adeusaa AMa Paz% Iftug AWAsNtw b ia 69
nor Slim$
fl ,Nt Cri Xot 4t N~~ at e ~ O atts u. .8- 5 w
UNNO W 12EO41 IM~
Plftf* XWfWr $0 &SeMs M.Y ofthe Pm.14wt Agremaw% (Tr..d~IV rueitawr IeR-MUem "d Pa=t 00setl WU=W nt PMJ4e6) bwbWMevs 400ed J=6 19, 1974. MM VIAW Olth aw gd---a-- au*AtVhe seseA Weep4 of s-wuma, we sgpw Oat %be Trmb pmjeet sh=UdU" b kr"* ltOk Vsmntim ix 000"*Am UAa ts Irla fi*O&niU d.*"*7y 24j, ,94 AggeseM by the A4**sA&M=. *sedig7 is is prv"NedMAI tb* Predeat ApVenlW% bo &*mNW as ftUss
~~U~mw Gsamt .b*
(b) Ir 00eaasa Mb Rnegeneauawm *A A-rMA3A 1110t 00 reeowt Apew--.
Pivas lamite romr ag emm ad te ealf by sltMW team Of O.nm= c am the attadhed 9Wat er U ttr wAnmbxwdsta It to no.
Wiim amnd
Tseultswr CORPeMUMe at ua
0 INTERNATIONAL DEVELOPMEY'A8 2t Ni'NAL dAk - l. ///4 M
1818 H Street,N.W, Washington, D. C. 20433, U tA,.. C 20:2 Tlp.0I,- E X.M.. 34-360 - C.W, A"h., -IN DEVAS
YJOY7 23, 1975
Fertilizer Corporation of IadiaF-34 South fttmudogi Ae Paft IRing RoadNow Delhi 49
Dear Sire:
fabjeets aedit No. 481-IN
Please rofer to sNtMlo 2.09 o the ?Pwo et Agreement (TroayIV Fertilier Upanaise sad Plat Operates Ywovement Project) betweenus dated June 19, 197 . In vieW of the eanW Cir stanew affectingthe world supply Ot WAM oa, M agPW M W Tr bay V project uhoil*not be brout Anto peuyet in aosoudase with the Time fthedtle datedmay 14, 197 , approvd by the Aoeisatim. Aoordingly, it is proposedthat the Project Agreenwt be anmgded as fellows,
(a) y deletim Of etSU R.09 Of the Projeet Agpemast;am'
(b) By VWe13Ag the subsegnt Bootone in Article IIef the Pfetjwt Agsint.
PleaSe iniuate yur agrewsat with the foregoing by signingthe ftOz of oonfMiAMatn the attahed ep of th4s letter andreturning it to us.
V027 tM4u yours,
INTUMNAL MWI~LM/ES . aWG1IATION
VifI an DiamondKrector
Nth Asia Q0WtV ProWpeR Department
CGNFIJFe -cr 0exporation of hba
by:
Chan mia & M4a.agimg Lainu xFertiletr Corporamiom of led, .
F43 N. 0. S. F. Part i,New Dclbi-ie49.
Jul7y 23s 1975
Mr. S. 0. DeBaksichief ngineer (Zgu.)The Frtisew Corporation of India Ltd.bDm y, IMDIA
Dowr Mr. D&. Deiy
Rot Trombey lpumsion IVCredit No. 1481-IND
This is to acknw4A~dge receipt of and thw*t y for yletter of July 4 la '"Mi your Monthly Progme Report No. 13for the Mmnth of Jme 1975.
Chanasy Ir. DeweyChief of Divisim III
Industrial Projects Depwrtwnt
ct, Yoer. Tortrelli, Sbattg, Ferran
JWSAI i: Mat
THE FERTILIZER CORPORATION OF INDIA LIMITED(GOVERNMENT OF INDIA UNDERTAKING)
(TROM&AY EXPANSION)
Telegrams: 'FERTILIZER' BOM8AY-74. (AS)
BOMBAY - 74. Phone: 522267
521451
Our Ref. No. PUR/EXPN/VBL22 22n July, 9
P. K. Sen,Materials Manager(Expn).
Dear Mr. E. Tortorelli,
Re : Trombay-IV submission of documentsour order no.PXY/12/10037 for
002 Compressor.
In continuation to our D.O. letter no. PUR/EXPN/B/15, dated 3rd May, 1975,
kiddly find enclosed purchase order copy and amendment no.1 in respect of
order no. PXY/12/10037 for C02 Compressor for your inriormation and record.
With best regards,
Yo s sixC.Frely,
( P.K. Son)
Mr. E. Tortorelli,Industrial Projects Department,International Bank for Reconstruction
& Development,1818 H. Street, N.W. Washington,D . C. No. 20433,U.S.A.
THE FERTILIZER CORPORATION OF INDIA LIMITED(GOVERNMENT OF INDIA UNDERTAKING)
(TROMBAY UNIT) Marvali, Chembur.
TELEGRAMS: ' FERTILIZER BOMBAY 40Q 074,PHONE: 52 1451
Our Ref. ro.22=41Z. 1 -Bombay, Dated the 22nd July,19 7:
Mr. E. Tortorelli,Industrial Project Department,International Bank for Reconstruction & Development1818H, Street N.W.Washington DC 20433USA
Dear Sir,
Sub: Purchase Order documents -
Motors for Trombay Expansion Project.
We forward herewith the following documents for
your kind reference and record in connection with procurement
of 27 Nos low tension motors(400 Volts) required for Nitro-
phosphate roup of plants.
D) Purchase Order - 2 copies
(2) Bid selection
(3) Bid Summary
(4) Format 384
(5) Bid Documents
(6) List of qualified suppliers
Kindly acknowledge,
Thanking you,
Yours faithfully,
I (P.K. Sen)Materials Manager (Expn.)o
ss/22/7
JUl~
r /V
Mr. 11 aim Mwnowd jea 22, 1975
Ann Ro. MdIt (thmvghA ) Sksl Attsbvih)
DWZA - ZE K IV AEtA ME ?z.
1. As you wL U resell, xt te Lea Cedtitea woun4 to qtA proposed AwtILSW Embtx VII P"Jdtt W. hwop aidi4 that Utol4Pal dDC'seS ar zy projeat be aweded soa ---o W
tAlma aemat of the postponement of TrabW V.
2. IDA h*A b. quiz4d that k= vndeb the Trq V pjseota MUM t OfAWNm a fr Tronker IV. HOWPOer, the priority &O00g,"
%0 Tr V had alipp.4 beemse the wrld w4*V t of A MgOVetd to &ee, -akiug It P"&inU tkt a ofr e 0s 14 be-ntexed into Am the period until aummia mw avosleahe g" Tadianswarms,, and bocsasw MI I fen--ac - mitnatimos 3 M t Mvpportshother major FMn,3*" at twis stope. The Prewprait"l DecsiotnMeoUng (and vmeeat34 Mr. Snapp) seaewre ain e1of postpwnin tb* pr*Nwt.
3. The intent of tbs oavenant requiriag T mba v to be i. i.msted 0ooxrting to a aere geb edue - i.e., the Ogq y of -amft .
U oovered In eneral tons IA Segmen 4.02 of the lq=Mt argatAgre"Oent, 1W ab requires Q* arnwvr to *asak@ &=wrants xatig-act=7to the Assoclhtio" for the supply of aUl vamielu$, mneang &Naa and
Pbeapte romk, by paeIttin isrts if =d Ubgn tNM Wt, in sahquantities as aw-l be &4equate to Operate tim TrIauw Unit up to gal
eva ty. a, $e .AVO 4P%" lit te Lega sad -Lwete14aPVOJ*"a Digartimets tbab Um bet approah vould be xte*,r to 6&ae*U8octian 2.09 of ths Pmojwt Agreeswu, *hd a Ineorratee Ue Ichaftle
fbr Iamlentatim ot MMebyg y.
4-. If you a., plese, 4a the attalie letter to JI.
clear* with a" eas Mesmrs. Domy
Mr. WIlliwa Diamond July 22, 1975
Ann 0. Harilton (through Bilsel Alisbah)
INDIA -- TrombMp IV ?ertilizer Projeot
1, As you will recall, at the Loan Comnittee meeting to considerthe proposed Fertilizer Industry VII project, Mr. Knapp asked that thelegal documents for the Trombay IV project be amended as necessary totake account of the postponement of Trombay V.
2. IDA had required that P'Ol undertake the Trombay V project asa source of ammonia for Trombay IV. However, the priority aceordedto Trombay V had slipped, because the world supply of ammonia wasexpected to ease, making it possible that a supply sentract could beentered into for the period until amwonia was available from Indiansources, and because KFI's financial situation oould not supportanother major projeet at this stage. The preappraisal DecisionMeeting (and subsequently Mr. Knapp) concurred in the desirabilityof postponing the project.
3. The intent of the covenant requiring Trombay V to be imple-mented according to an agreed schedule -- i.e., the supply of ammonia .is covered in general terms in Section 4.02 of the Development CreditAgreement, which requires the Borrower to "make arrangements satisfactoryto the Association for the supply of all materials, including amnonia andphosphate rock, by permitting imports if and when necessary, in suchquantities as shall be adequate to operate the Trombay Unit up to fullcapacity." Accordingly, we have agreed with the Legal and IndustrialProjects Departments that the best approach would be sinply to deleteSection 2.09 of the Project Agreement, which incorporates the schedulefor implementation of Trombay V.
4- If you agree, please sign the attahed letter to YUI.
AtachngEntAOHamiltonCleared with and ocs Messrs. Dewey
Singh
S INTERNATIONAL DEVELOPMENT INTERNATIONAL ANKi FOR INNATIONAL FINANCE
ASSOCIATIQN /RECONSTRUCION AND DiVELOPMEN ORPORATION
OUITGOING WIIRE
TO: FERTILIZER CORPORATION OF INDIA LTD. DATE JULY 2 1975TROMBAY UNIT
BOBAY CLASS OF ZQXigp;"3SERVICE
6668
COUNTRY. INDIA
TEXT: FOR IEBAKSI. REIRLETS JULY 8 BASED ON EVALUATION RESULTS SUPPLIED WECable No.:
HAVE NO OBJECTION AWARDS OF PXY/12/1003B OMICAL AND SLURRI PUMPS TO
PAUL BUNGARTZ STOP WE HAVE NO COMMENT ON CORRECTION UHDE QUOTATION
NITRIC ACID TANKS PXZ/A3/10040.
REGARDS
SHETTY
NOT TO BE TRANSMITTED
AUTHORIZED BY: CLANCES AND COPY ISTRIBUTION:cc: Messrs uczhs
NAME Y. T. Shtty DeweyPerram, Tortorellk-o/r
DEPT. Industrial Projects Department Espiritu ()Robbin - F53
SIGNATURE(SIGNATURE OF INDIVIDUAL AUTHORIZED To APPROvE)
REFERENCE: Com-i ai on Suctioni
ORIGINAL (File Copy)(IMPORTANT: Se Secretaries Guide for prpering form) Checked for Dispatdh
248423A UR INCOTh e
U1 AL A 11 24-7 (ilex Nr)
From: Bombay ---
i.E)'A 6E 14 1 17-7-75 8'.00 HM IST jut173
Dstribtn:AT TN i TO TOELLI
FASTnER TU LETTEr NO. EXPD/IO0/75/1759 ATFD 2ND
JULY IS75, TKHR I SOM'E FLItih DEVELLJPLET ANt) ACCORDINGLY
WE hAVE t EVIEIWED THE wilOLE I-T0 AND GIVEN THiE iiEVISEL
RECMMNDTINSFilR THE PLACE.-JENT () On'bEiiS UN ME6SRS. LAiRSEN
AND TOWBRO AND MES; 6. BtRON'SwLERM. THia KiEVISELD RE4COMMENDATION
EAS BEEN POSTE-D 16, YLU 6Y 6jl LETTER NO. EXFN/1(59)/G/75
DATED 17TH JULY, 1975 ALONG WITH ThE REVISED l ANALYSIS
FORM. KINDLY EEND YOUR APPaOVAL AS PER OU E
/S C DE AKSI F I LZE tROI AY EXPANI1N/
Frm No.
INTERNATIONAL DEvELoPmEN7 INTERNATIONALBANKFORASSOCIATION RECONSTRUCTI AN DEVELOPMENT TIO
OUTGOING WIRE
TO: FERTILIZER CORPORATION OF IMDIA LTD. DATE Ju7 16, 197TOBYUNIT
BCBAY CLASS OF TELEX 113027SERVICE
Ext. 6666COUNTRY: INDIA
TEXT: FOR DEBAKSI. RE)TETS JUNE 23 AND 30 E HAVE NO OBJECTION TO YOURCable No.:
RECOMENDED AWARDS OF PXY/12/10074 TANKS AND VESSEIS TO LAMME AND
TOUBRO AND BRONSWERK.
REGARDS
TORTOR.L.I
NOT TO BE TRANSMITED
AUTHORIZED BY: CLARANCES AND COY DTRIUTION:cc: Messrs. Fuchs
NAME E. Tortorefli DweyPerram, Shetty
DEPT. Indust#1 Projects Department Espiritu (Ms)Robbin (Ms) - F530
SIGNATURE(SIGNATURE OF INDIVIDUAL AUTHORIZED TO APPRovE)
REFERENCE: F - Trombay I For U,. Copmunkuo Setion
ORIGINAL (File Copy)(IMPORTANT: S.e Secrtie. Guid. for pr.,.ring fom) Ccked for Dai.
24 423B IBRD UR INCOMING TELEX vo
SUPHALA 01i32 NO)
Distribution: Industrial ProjeatsMr. Alisbah
MESSAGE NO 17 16-7-75
FROM MATERIALS ANAGER (EXPN) FERTILIZER CORPN OF INDIA LTD
TROMBAY UNIT BOM'1SAY INDIA
c-
FOR KR E TORTORELLI IBRD WASHINGTON USA
PLEASE NOTE WE HAVE MAILED TODAY FOLLOWING DOCUMENTS FOR
PURCHASE OF 2 NOS. 30 MVA 22/11 KV TRANSFORMERS FOR MAIN
ELECTRICAL RECEIVING STATION. 1) BID SUIMMARY, 2)
BID SELECTION, 3) FORMAT 384, 4) ISET EACH OF QUOTATIONS
RECEIVED FROM FOUR VENDORS. THESE PAPERS ARE SENT TO YOU
FOR YOUR SCRUTINY AND RECORD. KINDLY ACCORD YOUR APPROVAL TO OUR
PROPOSAL AS PER COMMITTEE'S RECOMMENDATIONS. PLEASE NOTE
THAT SINCE THE VALIDITY OF PARTY'S OFFER WAS EXPIRING ON
9-7-75 AFTER A PERIOD OF 90 DAYS FROM DATE OF TENDER, WE
PAVE ISSUED A CONDITIONAL LETTER OF INTENT ON MESSRS PANWELS
TRAFFO BELGIUM. THE LETTER OF INTENT SHALL RE TREATED AS
CONFIRMED ONLY AFTER OBTAINING YOUR APPROVAL TO IT.
REQUEST REPLY BY TELEX SO THAT FIRM ORDER MAY BE RELEASED
IN FAVOUR OF MESSRS PANWELS TRAFFO, BELGIUM.
FSC OVER
PLACK+?
24r4233 IBRD UR
SPlHALA 0113027
S UPhLA 0113027 (Telex Nr.) IutL{ /IFrom; Bambay 1i<trib
MESSAGE NO 1 46 15-7-75 I MrdUtial Pro
FO, 'RE TORTORELI IN-TEXRNATIOAL 6d L}c O hECOiCO fCT1UCTICu++
RECONSTRUCTION WASHINGTON
REOUR TELEX DATED 2WD JULY READS AS FOLLOW6:
PRoPOSE TO PROCUREM+ PROCURE FOLLO L ITEMS ON
PROPRIETuHY BASIS AGAINST PLANT UPEi;ATIONS AND IMPY0V2'T
PROGRAiE UNJDEH C2DIT N SI 4S1 (DEVELOPMENT CREDIT
AGREEiEWT BETWEEN INDIA AND IDA FOR AN-i IA PLANf.
1. FEED STUCK PAEHEATER COILS (4 NOS) FROi yESSRS BOa" INC
P. 0. BOX 102 TULSA OKLAHOMA 74104 USA FOR DOLLARS
1,19,000/- (FAS).
2. WASTE HEAT BOILEr COILS (2 NOS) FROM 3RESn5 ONSWERK
k A B, BhONSWERK B.V.P.O. BOX N0 273 AMS+ AMERSFOORT,
iHE LA-DS FOR DFL IO5,800/- (F03).
THE INSTALLED v'EELd STOCK PREhATW AND WASTE HEAT
BOILLRS WERE ORIGINALLY PFrC-hS2D F NOI MESSA 30tN INC.,
USA AND RSSjS 6rOSWERK NETHEI-LAND RESPECTIVELY. THESE
COILS PROPOSED TO BE IMPOhTED ARE REQUIRED FOR
R PLACELENT OF THE EXISTING 0iES.
HEQUEST ACCURO YOUR APPrfOVAL FOf Pi-OCURiENENT OF THE
Ai0Vz: COILS ON PROPAIETORY BASIS AT THE EAL-LIEST.
TELEX -EPLY AWAITED.
// S 5 JAY~i AV DY MAThRIAL2 MANAGEH
FERTILIZER CORP& OF INbIA LTD BOMBAY INDIA//
(3-0)INTERNATIONAL DEVELOPMENT INTERNAT1ONAL BANK FOR INTERNAtNA FINANCE
ASSOCIATION RECONSTRUCTION AND DEVELOPMENT C|RPORATIN
OUTGOING WIRE
TO: FERTILIZ|R CORPORATION OF INDIA LTD. DATE July 15 1975TROMBAY UNITBOMBAY CLASS OF
SERVICE:(Ext. 6666)
COUNTRY: INDIA
TEXT:Cable No.: FOR B. S. JAYARAM. REURTI 1L6 DATED JULY 15 WE CONEY APFRovAL
TO PURCHASE REPLACEMENT COILS FOR FEEDSTOCK PREHEATER AND
WHBOILER FROM ORIGINAL EQUIPMENT SUPPLIERS BORN INC AND
BRONSWERK RESPECTIVELY FOR TROMBAY POIP CREDIT 481-IN.
REGARDS.
TORTORELLI
NOT TO BR TRANSMITE
AUTHORiZED BY: CLEARANCES AND COPY DISTRIBUTION:Mesars. Fuchs, Dewey, Perranm, Shetty,
NAME E. Tortorelli Ms. Espiritu, es. Robbin (F530)
DEPT. Industrial Projectas Department
SIGNATURE(SIGNATURE OF INDIVIDUAL AUTHORIZED TO APPROVE)
REFERENCE: FEspiritu/tr - Trombay IV PcI p 'o -" By C*"unica
ORIGINAL (Fife Copy)(IMPORTANT: See Secretaries Guide for prepering form) Chocked for "patch:
THE FERTILIZER CORPORATION OF INDIA LIMITED(GOVERNMENT OF INDIA UNDERTAKING)
(TROMBAY UNIT)TELEGRAMS: ' FERTILIZER Marvali Chembur.PHONE: 5 2 14 5 1. BOMBAY 400 074.
Our Ref. No. PXT/42/10055 .J L Bom bay, Dated the 14th July, :g 7
Mr. E. Tortorelli,Industrial Projects Department,International Bank for Reconstruction & Development,1818 H. Street, N.WWashington D.C.20433U.S.A
Dear Sir,
Sub: Documents for purchase of 2 Nos 30 MVA,22/11 KV Transformers for main sub-stationTrombay Expansion Project.
We send herewith the following documents for yourkind reference and record on the above subject.
We have issued a telex letter of intent to M/s PauwelsTrafo, Mechlen, Belgium. This letter of intent is subject toyour kind approval to our recommendations. The party has agrec.Qto th&s conditional letter of intent in writing.
The firm order shall be released after obtaining yourpermission to this proposal. We shall forward you 2 sets ofpurchase orders as desired after the same has been released tothe party.
Kindly intimate us your approval to this proposa. ontelex. The documents sent herewith are
(i) Bid Summary(2) Bid selection(3) Format 384.(4) Quotations received(4 Nos) from vendors.
The bid documents and list of qualified parties towhom our enquiry PXT/42/10055 dated 2 . { was issued have alrezbeen sent to you vide our letter PXT/42/10056 dt. 30-1-1975.
Thanking you,
Yours faithfully,
(P.K. SEN)MATERIALS MANAGER(EXPN.)
........ y
TH E F Lu--- CC' O AT(GOVERNMENT OF INDIA UNDRTAKING)
(rTaoAAY EXPANION)
Tcelerams: 'FERTILIZER' P.K. So BOIM12AY-74. (AS,
BOMAAY-74. 7
52216 Addl. Chief Engineoervt (
Our Ref. No. EPr/(69) /75/ _
Dear Mr. Tortorelli,
As Shri S.C. De Baksi, is out of station, I am sending
herewith one more copy of the contract between FI and
FIACT regarding modific.tion of Sulphuric Acid Plcnt,
nas desired by you by your cable dated 9th July, 1975.
With kind regards,
Yours sincerely,
Lncl. 1
( P. K. Sen )
Mr. E. Tortorelli,
Industrial Projects Depnrtment,
Internntional Rank for Rocon strutction-and Development,
1C18 H. Street, 1 .W.,
WASAINGTON D.C. 20433,U. S.A.
Original to.
JULe i Q CommunicationsSI ns
THE FERTILIZER CORPORATION OF INDIA LIMITED(GOVERNMENT OF INDIA UNDERTAKING)
(T3015A1 EXPANSION)/Telegrams: FERTILIZER' BOMBAY -74. (AS)
BOMBAY-74. Addl. Chief Engineer(M) Phone: 522267521451
Our Ref. No._ xpn/1(69/75/ 9{~ 12th July# 19 75,
Dear Mr. Tortorelli,2
As Shri S.C. DIe Baksi, is out of station, I am sending
herewith one more copy of the contract between F01 and
FACT regarding modification of Sulphuric Acid Plant,
as desired by you by your cable dated 9th July, 1975.
With kind regards,
Yours sincerely,Encl. 1
( P. 1K. Sen)
Mr. E. Tortorelli,Industrial Projects Department,International Bank for Reconstruction
and Development,1818 H. Street, W.W.,WASHINGTON D.C. 20433,U.S.A.
10Ct W fl 1i9 UMV 2S
A!ECE AE
RECEIVEe
COMMUNICATIONS
SECTiON
~~~ E C$L4 10 Nf
ny allncloh Dc' l2
( b* *'20
UnQaLGJF AODp AO G prf TQfpa ;spp yhfir~ TUd2
QfL6Vax~P f9d \2' ' e isaT beo;o fpotia ag
(LwuvxBowe -14, V2
COAEVWELII OE ILDV nOMDEIYK'HC)
IHE :E8iIIXEK CObbObVJIOW L IMDIV r-ILV1 ED
THE FERTILIZER CORPORATION OF ;NDIA L M TE(GOVERNMENT OF INDIA UNDERTAKING)
(TROMBAY EXPANSION)Tegrams: ItRTZiZER'
OrMBAY74. (A3,4OMSAY - 74.
Pkonc: 2 Z52 i 4
Our Ref. No-PUR/AXPN/ t
P. K. SEN,M-AERIALS MArA5R(EXPN).
Dear Mr. E. T ortorelli,
Rea Tro bAy . IV Expnsionubission of documants
Our rcs.no. PXY/a2/10054
Kindly find enclosed one set of our Notice Inviting Tender, 81d EuR oomazemdations, Formatt No. Z4 duly 44lled in and quotation of CCm wbidder, in respect of Crystalisers (18 nos) being ordered on /, O::riaLUIGI RESTA, ITALY, You are requested to kindly convey your approval forthe same.
With best regards,
Yours sincerely,
( P. K. S~ii ),
Mr. E. Tortorelli,Industrial Projects Departzent,International Bank for Reconstruction
& Development,1813 H Street, N.W. Washington,D. C. 20433,U. S. A.
r..
- ,4 4, 49
INTERNATIONAL. DEVELOPMENT INTERNAAIONAL BANK FOR I ONALFIAASSOCIATION RECONSTRUCTION AND DEVELOPMENT CORPORATON
OUTGOING WIRE
TO: FERTILIZER CORPORATION OF MIA LTD. DATE. Julv 1 1975TROMBAY UNITBOMBAY CLASS Of k-M"
SERVICE:Ext. 66
COUNTRY: INDIA
TEXT: FOR DEBAKSI. REIRLET JUNE 24 WE HAVE NO OBJECTION CONTRACT AWARDCable No.:
IFXY/12/10009 LIME DRYING UNIT TO BUTWER SCHILDE.
REGARDS
TORTORELLI
NOT TO BE TRANSMTTED
AUTHORIZEi BY: CLEARANCES AND COPY DISTRIUTION-oos Messrs. Fuehs
NAME E. Tortorelli DeweyPerram, Shetty
DEPT, Indatri OOes Department Espiritu (Ns)Robbin (Ms) - *5&S F530
SIGNATUiRE(SIGNATURE OF INDIVIDUA. AUTHORIZED To APPnovt)
REFERENCE FEpiritumFor Use By Commations Secion
ORIGINAL (File Copy)(IMPORTANT: See Secrtaries Guide for preparing fo"'m) Checked for Dispatc
Form No. 27
INTERNATIONAL DEVEOPMENT INTERNATIONAL BANK FOR I N A FINACASSOCIATION RECONSTRUCTION ANDb DEVELOPMEN CORiPORATION
OUTGOING WIRE
TO: FERTILIZER CORPORATION OFi INDIA LTD. DATE: July 9, 1975TROMBAY UNITBOMBAY CIASS OF TJIMQN42"K
SERVICE. Ex..6
COUNTRY: INDIA
TEXT: FOR DEBAKSI. REURLET JUNE 24 RE MODIFICATION OF SUUURIC ACID PLANTCable No.
WE HAVE CLEARED WITH OUR CONTROLERS DEPARTMENT AND HAVE NO OBJECTICO
YOUR PROPOSAL TO USE PROCEDURE 6 WITH IMA CONFIRMING L/s OPENED BY FI
IN FOREIGN CURRENCY STOP PLEASE AIRKAIL ANOTHER COPY CONTRACT BETWEEN
FOI AND FACT FOR CONTROLLERS RECORD,
REGARDS
TORTORELLI
NOT TO K5 TRANSMIID
AUTHORIZED BY: CLEARANCES AND COPY DISTRIBUTION:
cc. Messrs. FuchsNAME E. Tortorelli Dewey
Perram, ShettyDEPT. Industrial Projects Department Espiritu (Ms)
SIGNATURE Robbia (Ms) - F530
U F toDIovtID*U. A To APPROVE>REFERENCE: FEspiritA -T
ORIGINAL (File Copy)(IMPORTANT See Secretaries Guie for preparing form Chocked for DMspatch
THE FERTILIZER CORPORATION OF INDIA E(GOVERNMENT OF INDIA UNDERTAK G)
(TROMSAY EXPANSION)Telegrams: 'FERTILIZER' 4 (AS)
BOMBAY-74. S.C. De Baksi Phone: 5222675 21I451i
General Project MaPnge --
Our Ref. No._xp li9)B/75/ jg 9
Dear Mr. Tortorelli,
(3 (U
Trombay IV- Expansion -
Monthly Progress Report No. 13.
I am en 0J ing herewith the monthly progress report
No.13. The report includes all the annexures.
With kind regards,
Yours sincerely,
(S.C. De Baksi)
Mr. E. Tortorelli,International Development Association,Industrial Project Department,1818 H.Street,N.W.Washington DC 20433.U.S.A.
Encl : As above.
ft~to
W v'
" x
I 3 16 iJboU fpucT nJy i~Ei e Jn
~Lo 1 sA IA - xsgo
C, ~ ,
uri og~ vte
IME EWS rXEd C~LbCLVIIO# OL WDIV NE
248423A IBHD UR _INCOMf T'/X ~ /
SUPHALA 0113027 (Telex /From:Bombay /7l -Dis tribution:
MESSAGE NO 26 2/3-7-1975 DELAY Elfr Industrial Proj.38 Mr. Kraske
FOR MR E TORTORELLI CINDUSTRIAL PROJECTS DEPARTMENT
PROPOSE TO PROCURE FOLLOWING ITEMS ON PROPRIETORY BASIS
AGAINST PLANT OPERATIONS AND IMPROVEMENT PROGRAMME UNDER CREDIT
NO. 481. IN (DEVELOPMENT CREDIT AGREEMENT BETWEEN INDIA
AND IDA).
1) FEED STOCK PREHEATER COILS (4 NOS.) FROM MESSRS BORN INC
P.O. BOX 102 TULSA OKLAHOMA 74104 USA FOR DOLLARS 1,19,000/-
(FAS).
2) WASTE HEAT BOILER COILS (2 NOS.) FROM MESSRS BRONSWERK-
K.A.B., BRONSWERX B.V. P.O. BOX NO. 273 AMERSFOORT,
NETHERLANDS FOR DFL 1,05,800/- (FOB).
THE INSTALLED FEED STOCK PREHEATERS AND WASTE HEAT BOILERS
WERE ORIGINALLY PURCHASED FROM NESSRS. BORN INC., USA AND
MESSRS. BRONSWERK NETHERLANDS RESPECTIVELY. THESE COILS PROPOSED
TO BE IMPORTED ARE REQUIRED FOR REPLACEMENT OF THE EXISTING ONES.
REQUEST ACCORD YOUR APPROVAL FOR PROCUREMENT OF THE ABOVE COILS
ON PROPRIETORY BASIS AT THE EARLIEST.
// B S JAYARAM DY MATERIALS MANAGER K+ (P)
FERTILIZER CORPN OF INDIA LTD TROMBAY BOMBAY /
248423A IBRD UR INCOMING 'ELEX
SUPHALA 0113027 (Telex ) ' /,Ditibn: E
Industrial Projects
Mr. Kraske 1~MESSAGE NO 13 1-7-75 r Casson JUL
ATTN MR TORTORELLI SU CTON
KINDLY REFER OUR LETTER NO. EXPN/I(59/C/75/1552 DATED
13-6-75 AND TELEX NO. 121 DATED 16-6-75 AND CONFIRM
WHETHER YOU HAVE RECEIVED THE DOCUMENTS MENTIONED THEREIN
AS MESSRS GHH ARE STILL COMPLAINING OF NOT GETTING DOWN
PAYMENT.
// DE BAKSI FERTILIZER TROMBAY EXPANSION BOMBAY//
THE FERTILIZER CORPORATION OF INDIA LIMITED(GOVERNMENT OF INDIA UNDERTAKING)
(TRQHBAY EXPANSION)Telosrams: 'FERTILIZER, BOMBAY -74. (AS)
BOMBAY -74. Phone: 522267521451
Our Ref. No. 0 9
INTBFiATIOVAL DANK FOR RECOWSTMtCTIO ArD DEVELOfMLNTWAIGTO4
ATTENTION ML TORTOUELLI
KINIY R&UER OUR LETTER N0.mxPN/1(59)/C/75/1552 DATED 13-6-75
AND TELEX NO,121 DATED 16-6-75 A4D OONfI& W-HETHER 1OV HA7
EGEIVED THE DOCUMENTS MBIOUSD THERLIN AS 1/S. GRH ARE STILL
OCTPLAINING OW NT GETTM DOWN (.)
DE BAKSI
(S.C. DE BAKSI)GENERAL PROJECT MANAGER
1/7/75
Post copy in confirmation too Mr, E.Totet41li,SIdlistriA Projects Deportment,Tutetnatiowal Pank for Reconstruction and
1818 H. Street, N.W., DevelopmentWASHTNGTCN D.C. 2433,U.S.A.
DET9 Hr, lYK2
I~O"AFD C~EJ~3 oICsgD LF nI V tga.2; RM~
TEEV fl0EC 11 71E,
YiiD JFTBl 2075 YmD 7T-UA2 YTD CeMii~ 1Y*2AIFTH 3QL. h;a
rmtrx m~ cws rL1at NozEnx\T (2ca)\c\ae2V22s DVLED r2-G-A2
R E2LdIB 6QIL ~~6k Ll x9~j K L j 'v
Bo3 I 4 IBOWBYA-\ Juel2 t39
1el*L n : IcitE1%, EONBYA f (Vz)
(COAEYV1WEMI O IO#DIV noDELVKIC)LHE LEBiiFlIEB COi6OBVilOW Oh iMDIV rlWI1ED
July 1 1975
Mr. S. 0. DeBakoiGeneral Projeet ManagerThe Fert1iar Corporation of India Ltd.Trimbay LansicaBombay - 74 (AS)India
Dear r, DeBaksti
This is to acknowlodge receipt of a1 th, bid paekag" and.uwnari.s of equiomt, liuted in your latter of June 12. The packagemationed in your telex of June 16, which required advance paqemte,have been proceased aeoordingly. Payment for the following peakags,hawwor, will be mad* up=m r..e5pt of the appliation by our Contrallt'sDopartment.
PZZ/13/10040 Nitria Acid Storage Tanks10058 Nitraie Asid P~upe10078 Aania Evaporation Unit
In order to avid unnecoasar- delqe in paymont prosesaingwe request that yeu send us the bid seunaries for ur forma rovl,and for our record in ease of verbal aWreval, I edtte1y after theresult of the bidding is bun.
We take this opportunity to 4 -Ae receupt of your letterdated June 17 ealasing the eontract for PIT Stem GeneratingPlant.
With kind regards,
SUnOe4j,
E. TorterelliIndustrial Projeets Dpartment
cc: Messr;. FuchsDeweyPerram, ShettyEspiritu (Ms)Robbin (Ms) - F530
FEspiritu/om - Trombay IV
o74INTERNAIONAL DEVELOPMENT INTERNATONABAN
ASSOCIATION RECONSTRCON AND QiHhMEJNT CORPORATO
O U TGOGI NG WIRltE
TO: FERTILIZER CORPORATION OF INDIA LTD. DATE:- l A19 1975TROKBAY UNITBCMRAY CLASS OF TEEM "9 2
SERVICE:
COUNTRY: INDIA
TEXT:Cable No.: FOR DBAKSI. CONFIRM RECEIPT OIF DOCUMENTS MENT'IONED IN URIJET OF JUNE13
WE ARE PROCESSINGi WITHDRAWAL APPLICATIONS.
REQARDS
TORTORELLI
NOT TO BE TRANSMITTED
AUTHORIZED BY: CLEARANCES AND COPY DISTRIBUTION:
NAME c. ess uhE. Tortorelli Dewey
DEPT. PraSetIndu tria Projects Department Espiritu (Me)
SIGNATURE Robbin (Ms) - F530(SIGNA uRE OF INDIVIDUAL AUTHORIZED To APPyovF
REFERENCE: ETortore.'/om -rabay IVF
ORIGINAL (File Copy)(IMPORTANT: See Secretares GuIde for preparing forn) Checled for D1Ipatch
June 27, 3,975
Mfr. A. (. }lenonChief (.anagmt Peperting)
T-h3., Vouih t:e:o !Area, Par - 3.ing f, d, Nv TlD -
Dowr mr. fmen
Re. (~crddpur apFan.ion Project -Cr it 1o. 27)
NanJa. ~&paniOn Projects-crai No.357
TrOL! . -rd'.lt no. bell
Than yo-i very much for your l-tt'r Of, Ture 3, enclozingroisonal Fin&nct Etat~emnt - ?rofit & Lo!r Acceout and Balnce
'heet for the yar 1)714-75 in reqect of Trotbay, zanua andOorakbpir.
S iMcerely yors
Cbauneyr F. DaweyChiOf or Dip4?ion Mt
cc: Mer. ThrnaiuckI, Brown, Pkerramj Forbor
eir-J/hZl
Tr -
lb. lEzr/i(59%?/ ') i 5 27th Jul Q7.
4-'iar t r. Tortorelli,
::urs:ze rtao~m.eOntion for holler AdY, Tr e:ed n
I OM enclosin' harowith te uurchne recommendation for the Apnce b
of order on M/0. InIustrial & Ariritural Engineering Co.nG .v
Ltd, Bospy at a price of Rs. 70,40,150/- ( dolli 93,262 tL.the cost of the plnnt and some spres on a turn-key b\aiL N Ptransmit your approval for tho relcrse. of the purchase ordor .s
rucom:,nded so that wa may issue the purchAse order to the many
Kith regards,
Yours sincerely,
tnl:-4; nomixz:crticn of tha Tunder -committeo.
2) List of parti; to whom tenderswere issucd. ( S.C. D POWi
I) Ccoaparatiro :3babcmen~t. , a
4 Copy of the Tend4 Qr Inquiry,5 WArty's quotation,
Mr. E.Tortorelli,Industrial Projects Depsrtment,
Wintrnational T1arik for Rocons rretion arDevulopment,
1818 H.Strect, N.WV,WJiIhINGTON D.C. 2043,
THE FERTILIZER CORPORATION OF INDIA LIMITED(GOVERNMENT OF INDIA UNDERTAKING)
(TROMBAY UNIT)TELEGRAMS: I FERTILIZER' Marvall, Chembur.PHONEzS 2145I BOMBAY 400 074,
Our Ref. No. Pr11211121 W9 Bombay, Dated the 25th June 1975
M/s. International Bank for Reconstructionand Development,1818 H. Street, N.W.,Washington D.C. 20433
Attas Mr. R. Tortorelli,Industrial Projects Dept.
Sub i Trombay-IY, Credit No. IN-481.
Dear air,
Enclosed please find N.I.T., list of parties, form
384, comparative statement, committee recommedation,
Q&otation of success full Bidder and copy of purchase order
for Phosphoric Acid transfer Pumps.
Please acknowledge receipt and confirm that they
are in order.
Thanking you.
Yours faithfully,
(H.B. Xulkarni.)0 ? Jr. Engine er (Mater ial)
June 25, 1975
Mr., S. C. DeBaksiGeneral Project ManagerThe Fertilir Corporation of India Ltd.Trombay Exn xonBombay - 74 (A)India
Dear Mr. DeBaksa,
I am writing to you in relation to the Trombay IV monthlyprogress report for May 1975. Lot me epriss my apPreciatiOn for theefforts you put into the report to make it as ompt. and useful aspossible. You will recall that during our recent visit to Trumbay inmay 1975, we discussed the revised capital cost of Trombay IV, %hichshows now an overrun of about 28%. I was therefore surprised in find-ing out that your May 1975 progress report does still show the originalcapital cost, with no mention to a revised estivate or to any costoverrnm.
I realise the difficulties you may have in changing the costestimate reported in an official dounent, such as the progress report,when the Government of India has eventually to approve any cost estimate,original or revised. On the other hand, I believe that the monthlyprogress report, being essentially a tool for manageRent control, hasto include the latest estimate of the project capital cost.
I hope therefore that you will be able to report the revisedproject cost in the future editions and that should any change occur laterin the cost estimate it will be promptly reflected in the progress report.
For your convenience I am sending you the revised capital costfor Trombay IV, in the usual Bank format.
With my beat personal regards,
Sincerely,
E. TortorelliFTortoreli7/,i - Trombay TV Industrial Projects Department
Enol.cc: er Fuchs
e ,V er~r, Shotty, Ci5tard2 oncini, H amilton (M s) - 051h
Mr. J. Tixhaosa VPSEH Jmne 24, 1975
EuztohioTortor*ll
INDIA - Iaftb IV Sufr ASid - E09l
In rwpmw* to your n of Jume 4, 1975, this is the infoxmationrequeuteds
S02 onceentration,in flue gases - mas m 600 ppm
mesa 5wO pf
Stak height - 55 Mt.
cci Dr. J.A. LeeMr. DowarMr. Perrem
WTrtreli/e - Trambay IT
as FEUiJi< C LO*ATION (AF' iNDIA LIMITED(GOVERNMENT OF INDIA UNDERTAKING )
(TROMBAY UNIT)TELEGRAMS: 'FERTILIZER' Marvali, Chembur,PHONE : 52 I 4 5 I BOMBAY 400 074.
Our Ref. No. %x/2/0O37. Bombay, Dated the 19th June- 1975.
/s. Internatipnal Bank for:econstruction & Development,318. H. Street N.'i., Washington,
'. J. 20433,U..S.A.
Attn :- Mr. Tortorelli Industrial Project Dept.
1 "- Trom 1y IV 2Zedit o. I1 431
Dear Sirs,
'.e refer to our letter dated 3rd May-75 from our General
Project Manager enclosing Form 334, Committee's recommendation,
comparative statement and quotation of success full Bidder for
2o Compre sor. We are enclosing herewith following additional documents
3or ;2 Compressor for your kind information and record.
1. ;IT with specifications
2. List of Parties.
3. A cop'A of P.O.
Please abknowledge the receipt and confirm that they are
in order.
Thanking you,
Yours fa 'thfully,
(E.B. KULKA,% I)For Materials Manager(Expn).
Enci z As abovc.
AE ITILIZER CORPORATION OA INDIA LITDiW(GOVERNMENT OF INDIA UNDERTAKING)
(TROMBAY UNIT)TELEGRAMS: FERTILIZER Marvahi. Chembur.PHONE: 521451 BOMBAY 400 074,
Our Ref. No. PX/42/1D142 Bombay, Dated the _- Jne, 1975
M/s International Bank forReconstruction and Development
(The Industrial Project Department)1818* H. STREETM.W. Washington D.C. 80433U.S.A
Dear Sirs,
Subs DCI Trombay IV Project.
We send you herewith one set of each of tenderdocuments for our Trombay IV Project.
The closing dates of these tender have been fixedas indicated below. The tender has been sent to all therespective approved venders as per the list of suppliersalready submitted to you.
Sr.No: Item Tender No. Due date
1- 11 KV Metal clad switchgearand Accessories PXT/42/10142 22-7-75
2- 3.3. KV Metal enclosedswitchgeat and accessories PXT/42/40 1 10-7-1975
3- 415 Volts Switchgear andaccessories PXT/42/to/3/ 10-7-1975
This is sent to you for your kind informationand record.
Thanking you#'
Your faithfully,
(S.C. De Baksi)General Project Manager
THE FERTILIZER CORPORATION OF INDIA LIMITEL( GOVERNM i N f , 01, 1 1'IA 'it 0FAMigI 0
(TROMBAY UNIT)TELEGRAMS: FERTiLIZER
Marvali, Chembur.PHONE. 521 45 74 BOMBAY 400 074,
Our Ref. No. /42/J1 4 2 L Bombay, Dated the unvI9 75
/s International Bank for Reconstruction &Development,
(The Industrial Project Department)1818, H. Street,M.W. Washington D.C. 80433U.S.A
Dear Sirs,
Sub: FCI Trombay IV Project.
We send you herewith one set of tender documentsfor our Trombay IV Project.
The closing dates of these tender have been fixedas indicated below. The tender has been sent to all the rrespective approved venders as per the list of suppliersalready submitted to you.
Sr.No. Item Tender No Due date
1- 22 KV, 11 KV, 3.3 KVPower Cables PXT/42/1o128 16-7-1975
2- 110 Volts D.C. Switchgealk PXT/42/1o141 7-7-1975
3- 110 Volts D.C. Batteryand Battery Charger PXT/42/ 10130 18-6-1975
This is sent to you for your kind information andrecord.
Thanking you,
Yo rs faithfully,
(S.C. De Baksi)General Project Manager.
Encls As above.
7(
THE FERTILIZER CORPORATION OF INDIA LIMITED(GOVERNMENT OF INDIA UNDERTAKING)
(TROMAY EXPANSION)
Telegrams: 'FERTILLZER' BOMBAY-74. (AS)
BOMBAY -74. Phone: 522267521451
Our Ref. No. PX141O030 17th June, 19 75
The International Bank forieconstruction and Development,
10 H, Street, N.W,W .ihington D.C. 20433U.S.A
Dear Sir,
Sub: Steam Generation Plant for Trombay IVExpansion Project Documents.
We forward herewith I set of contract papers for
170 Ton per hour stetm generation plant for our Trombay IVL ) nsion Project. The contract has been entered into
;keen us and Ws Bharat Heavy Electricals Ltd, Madras,India.
we are sending in A. ,eparate cover I set each of
roposals received from two> to this tender sent to bidders
i parties as per the list approved by you. The bid summary
and comparative statement of two proposals received alongwith
w rchase committee's recommendations have already been
forwarded to you vide our letter Expn/l(79)C/75 dated 9-5-1975.
Our tender enquiry along-with necessary annexures and
one copy of tender set has already been sent to you. We
confirm having received your telex message awarding your kind
aproval to this contract and take this oppertunity to send
you our sincere tanks and regards for the same. These documents
are being sent to you for your kind reference and record.
Kindly acknowledge,
Thanking you,
Yours faithfully,
P.K. SSNEncl: As aboue. Materials Manager(Expn)
ss/ 17/V
INTERNATIONAL DEVELOPMENT INTERNATIONAL BANK FOR I INTERNATIONAL FINANCEASSOCIATION RECONSTRUCTION AND DEVELOPMENT CORPORATION
OFFCE MEMORANDUMO: Yr. Chauncey % nf, Division ITT DATE: June 17, 1975
FROM: Yermal T . FShe-y nd 1'ustachio Tor-to-(-lli"
SUBJECT: 7TTA - Tro1bay 7V Supervi ion ReportRevised Capital Cost Increase
The questior has been raised of what is the contribution of thedifferent items to the overall capital cost increase, experienced in theTrombay IV Expansion Project.
Table 1 below summiarizes the results of the analysis carried outon the data and information obtained in India, during our last supervisionmission.
T3F1 _ TMPAy 17 IV' EXPASION LRJET TrCAPTTAL COSTS COMPARISON
(in s P million)
Appraisal Erti ate Revised Estimate Increase(hay 797t) (Lay 1975)
Total 479.0 611.6 132.6 28
Increase due to:Currency realignment 2/ 16. 4Increased Cost of Equipment & Services 3 364 7Duty, Taxes and Freight h6.2 9Working Capital (higher raw material price) 15.0 3Civil Works (higher cement and steel price) 8.5 2Interest during Construction (higher project cost and 12.5 3
delayed completion)132.6 28
_ Appraisal mission took place in October 173-
2/ Appraisal estimate was based on an exchange rate of 1 D11 3.1 Rs,the revised estimate on an exchange rate of 1 DM = 3.4 Rs.
3/ The increase in the cost of equipnet and services is equivalent to10/ of the erected equipment cost estimated at the time of appraisal.
cc: Messrs. Fuchs - o/rPerram
ETortorelli/om - Trombay IV
Mr. Chauncey F. Dewey, Chief, Division III June 17, 1975Yermal T. Shetty and Eustachio Tortorelli
INDIA - TrombAy IV Supervision ReportRevised Cwpital Cost i--rea e
The question has been raised of what is the contribution of thedifferent items to the overall capital cost increase, experienced in theTroabay IV Expansion Project.
Table 1 below summarizes the results of the analysis carried outon the data and information obtained in India, during our last supervisionmission.
TABLE 1 - TRCHBAT IV EXPANSION PROJECTCAPITAL COSTS COMPARISON
(in Rs million)
Appraisal Estate Revised Estimate Increase %
M274y (ma 1270
Total 479.0 611.6 132.6 28
Increase due to:Currency realignment ./ 16.0 4Increased Cost of Equipment & Services 34.4 7Duty, Taxes and Freight 46.2 9Working Capital (higher raw material price) 15.0 3Civil Works (higher cement and steel price) 8.5 2Interest during Construction (higher project cost and 12.5
delayed completion)132.6 28
Appraisal mission took place in October 1973.
2/ Appraisal estimate was based on an exchange rate of 1 11 - 3.1 Re,the revised estimate on an exchange rate of 1 114 - 3.4 Ra.
y The increase in the cost of equipment and services is equivalent to10% of the erected equipment cost estimated at the time of appraisal.
ec: Messrs. Fuchs- o/rPerram
ETortorefla/w - Trombay IV
THE FERTILIZER CORPORATION OF INDIA LIMITED(GOVERNMENT OF INDIA UNDERTAKING)
(TROMBAY EXPANSION)Telegrams: 'FERTILIZER' BOMBAY -74. (AS)
BOMBAY -74. Phone: 522267
521451
Our Ref. No. ) - 9
NO, 248423 G IBRD URWORLD BANKWASHINGTON
ATTENTION MR. TORTORELLI
I HAVE CONFIIMED VIDE LETTER N0. E.PN/1(59)/0/75/1552 DATED 15-6-75
THE BID PAERTS THAT HAVE BEEN SENT TO YOU FOR YOUR PlECESSING PURPOSE (.)
KINDLY CONFIEt THAT YOU HAVE REdGIVED ALL THE PACKETS MENTIONED IN MY
LETTER (.) IT IS REQUESTED THAT FOR PROCESING YOU MAY ADOPT THE
FOLLOWING PRIORITY SINCE ADVANCE PAYMENTS ARE TO BE MADE TP THE PARTIESs
1) PXZ/15/10015 - TURBO AIR COMPRESS3O WITH STEAM TURBINE& EXPANSION SET
2) P1/15/10026 - COLUMNS 003 & 004
3) PXZ/13/10017 - A*4OJIA 01IPRESSOR
4) PIT/33/10019 - CONVEYOR BELTING
FOR THE BALANCE YOU MAY HAVE YOUR 0N PRIORITY (.) I HAVE ALSO SENTYOU VIDE LETTER DATED 5-5-75 THE BID SUMMARIES FOR THE FOU4JING ITEMS
1) NITRIC ACID STORAGE TANK2) 002 COMPRESSOR3) AIR COMPRESSOR4) AGITATORS
I HAVE ALREADY SENT YOU THE PURCHASE ORDER COPY FOR THE NITRIC ACID
STORAGE TANK TIDE MY LETTER DATED 13-6-75 (.) PURCHASE ORDER COPIES
CONNECTED WITH 002 COMPRESSOR, AIR COMPREMSOR AND AGITATORS WILL BE
MAILED TO YOU WITHIN 2/5 DAYS TIME (.)
REGARDSDE BAKSI ( S.C. DE BAESI)
GENERAL PROJECT MANAGERConfirmation copy by Air Mail ton- 16/6/5
Mr.E.Tortorelli,Industrial Projects Department,International Bank for Reconstruction and
1816 H. Street, N.WDvelopment,Washington D.C.2Q43,U.S.A.
:Gug o1p q y a ot De gttrcrur~L. T a; 0 Q
DE Byg / ( 20 DEI IT)
WYIflD -0 1011 AI HIM 5\2 DV1 lIIE (')
OC0kI7ClEf ll 0 OEO III CO C4Ui VSQWEERC ViD VO1VI00%2 AnTr BK
C IY7 AIDE KI rTr DTD. 2-uK if ( ) ve vHDKL n 0bIE
I UAE bT;TYD1 2FMI l 1C I HP'C1{Y2 QIDEH OOI 0T IE YIlIO VCID
I1) vcTIvIFo
) O, -Oc, a-a
i) "I4LIC %CID 2,GCKYSE IVM
I aD; rlE F VE g T - 2 IHE 1D -(J i VY IF2 T08 i rlF k)ITPIC, IJEW
b0II IHE bVfMCE I.U Xil HYAE kr-j 'iy LH1OHIIX (*) 1 HVAE vr'7 'Eo
i4) mL\a2\I0Ia - CUMEIQI BEFIIII
2) Lxs\ieVocIn - Ta40MIV UGsbHE220s
s) bX3\r2\oose - orn , 1o , Cot
I EjLI-I, OM VETJ) 5n2\I2\oT0 - 16Lri IHr QCNLEF20 MIII etEiN LIJBINE
E0PI0 bIOI0ML 2IMOE YDAVY1CE EIMElM J2 vxx 3o BE HYDE r1o uHE YI2
P 1E ') I IB E T 'DEL .D III I 0 Eh0 E12IMGiOR 011 WY DObI 111K
RIr 0C141IBi IEIV 100 HVAE IfEC1IAED irr 111K tLYOEI2 14F4IOMED III NI
12E BID IXC m2 LH I HVAE iBE 214 30 100 101111D EB)CEEI(G 14fl12E (')
I HAnE C0aMIwED AIDE rEE a0- Erbk\ ()\C\ae2Ve2s D'VID 12-e-A2'7 yl G' -1 T08 7. 71 ""I
Om'D BV i,0 S( i2 C IB YD i
OnL go Mo. j
2 S 1 42 IWOW BVA - fh~" 2
LIRtLSW w kEVA-IrI"s BOWBVA .(vz)
( AvowuYA I XbvK(IOM(GOAEwMWEMi OL IMDIV fWDE91YJKlWC)
LHE LEBL1LIE1 CObOLViO1A OL MDIV FILAJLLED
248423A I.3RD UR
SUPHALA 0 1 1327 (Tee .
ESAENO 121 I11011 ri75 1k
ATN TORT ELI
I HAVE CONFIRM1ED VIDE LEITER 190. EXPN/1(53)/C/75/155L DATE
13-b-75 THE _ID PACKETS THAT HAVE EN EU Yo
PRCESSING PURPOSE. KINDLY CONFI N THAT Y'U HAV R CEIVL
ALL THE PACKETS ,"ENTIONED IN hY L TTE i. T I' QUE T AT
FOR PROCESSING YOU MAY ADOPT THE FOLLOWI G PRI0 ITY INE
ADVANCE PAYNENTS ARE TO BE MADE TO THE PARTIESi
I. PXZ/13/10015 - TURBO AIR CO PRESQR WITH STEAM TURI' L
AND EXPANSION 5ET.
2. PXZ/13/10026' - C0LU S C03 AND 004.
3. PXZ/13/10017 - AI4NONIA COMPRES$0R.
~4. PXT/43/I 019 - CONVEYR BELTING.
FOR THE BALANCE YOU %2AY HAVE YOUR OWN PRIORITY. I HAVE AL0 SET
YOU VIDE LETIER DATED 3-5-75 tHE BID $UMARES FOR THE FOLLO I
1. NITRIC ACID STORAGE TANK.
2. COL CO.PRESSR,.
3. AIR COiMPRESSOR.
4. AGITATCR$0
I HAVE ALREADY SENT YOU THE PURCAASE ORDER COPY FOR THE NTRIC
ACID TOR GE TANK VI MY LTT R ATED 13-6-75. PU C AS 0 DEiL
COPIES CO NECTED WITI O CO iR S6OR, AlR CONPRS AWL
AGTATORS WILL EAILE TO YOU WITHI, E/3 Y TIME.
-DARA
// D BAKS FETLZR tR Y EPN$ /
June 16, 1975
W. S. G. Do BaksiChief ftmgiser (ma.)The Fertiliser Caerpoation
of India LimitedBoW:6V, IDIA
Dear Mr. Do Bakeis
Ret Tramiy a m IVcredit NO. hat-mN
This is to myuloe roceipt and thank ym- for yourletter of Juno 2, emloing your Monthly Propess Report Me. 12for the wnth of YAW 1975.
c~ r. NeueChief of DMvislon T-II
Industrial ProJects Dwpartowtle
oos 1smsr. TortorelU, ShettY, Perwau
OjMcniniAa
S. C. DE BAKSI The Fertilizer Corporation of India Ltd.Generai Proiec Manager Trombay Expansion
Bombay-400074.
'No. Expn/1(69) /75/ 2-- 14th June, 1975.
Dear Mr. Tortorelli,
This has reference to your cable of 4th June, 1975, regarding
the Sulphuric Acid Plant Modernisation Scheme at Trombay.
The guaranteed maximum concentration of sulphur dioxide in the
stac' k gas is 600 ppm (vol). We expect the mean concentration
of 302 to be 500 ppm (vol.). The stack height is 55 M.
With best regards,
Yours sincerely,
( S.C.De Paksi )
Mr. E.Tortorelli,Industrial Projects Department,International Bank for Reconstruction and Development,1818 H, Street, N.W.,Washington D.C. 20433,U.S.A.
Pfrri No. 27(3-70INTERNATIONAL DEVELOPMENT INTERNATIONAL BANK FOR INTERNAINA FINAN
ASSOCIATfON .RECONSTRUCTION AND DEVELOPMENT CORPORATION
OUTGOING WIRE
TO: FERTILIZER CORPORATION OF INDIA LTD. DATE: June 13, 197TROMBAY UNITBOMBAY CLASS OF TELE: 113027
SERViCE:Ext. 6666
COUNTRY: IMDIA
TETFOR DEBAKSI. REURTEL JUNE 12 WE HAVE NO RECORD HAVING RECEIVED URLETCable No.:
PIZ/13/GENERAL DATED IA= 12 STOP BID SUMDARIES FOR WASTE HEAT BOILER.
AND COLUMNS C01 AND 002 WERE RECEIVED WITH URLET CF APRIL 11 STOP
PLFA SE AIRAIL BID SUM4MARIES FOR RUILAINING EQUIPIKENT SOONEST STOP
SUGGEST YOU AIO CABLE CONFIRMATION OF BID SUWARIES AIR DELIVERY FROM
NOW ON.
REGARDS
TORTORELLIINTBAFFAD
NOT TO BE TRANSMITTED
AUTHORIZED BY: '4 RIIN;
NAME E. Trtorelli " eweyPerram, Shetty
DEPT. Industrial Projeets Department Espiritu (Ms)-
SiGNATURE Robbin (Ms) F530
A SIGNATURE OF INQIVIDUAL AUTHONIZED TO APPROVE)ETortorel/om - Trombay IV For Use By Camunias Seon
REFERENCE:
ORIGINAL (File Copy)(IMPORTANT: See Secretarips Gtide for preparing form) Checkd for Dispatch:
THE FERTILiZER CORPORATION OF INDIA LIMITED(GOVERNMENT OF INDIA UNDERTAKING)
(TROM BAY EXPANSION)Telegrams: "FERTILIZER' BOMBAY -74. (AS)
BOMBAY- 74' Phone: 522267521451
Our Ref. No. _PYl3/jh=_.R June. 1975.
M/s. International Bank for re-construction& Development,
818 H. Stutt M.W. Washington,D.C. 20 433,11 0. A.
Attnt- Tortorelli, Industrial Project DepartmentTrombay - IV.
Sub s- Bid Summary for our order LJ J.j
Dear Sirs,
With reference to the above subject we are enclosing
herewith the following documents:-
1. Bid summary ( form No. 384 ).2. Committee's recommendation along with comparative
statement.
3. One copy of the order.
4. one copy of our enquiry sent. (N.1T.)
5. List of parties to whom the enquiry was sent.
Kindly acknowledge receipt of the above documents and
confirm that they are in order.
Thanking you,
Yours faithfully,
S. D. BLIGA ),Jr. Engineer (aterial Expn).
EnClt- as above*
THE FERTILIZER CORPORATION OF INDIA LIMITED(GOVERNMENT OF INDIA UNDERTAKING)
(TRO4BAY EXPANSION)
Telegrams: 'FERTILIZER' BOMBAY .74. (AS)
BOMBAY -74. Phone: S 2 2 2 67521451
Our Ref. No.xP7/ C June, 1975.
M/s. International Bank for re-construction& Development,
818 H. Stutt M. W. Washington,D. C. 20 433,U. S.-A
Attns- Tortorell, Industrial Project DepartmentTrombay - IV.
Sub z- Bid Summary for our order Nt L, dIoms
Dear Sirs,
With reference to the above subject we are enclosing
herewith the following documents:-
1. Bid summary (form No. 384)
2. Committeess recommendation along with comparative
statement.
3. One copy of the order.
4. One copy of our enquiry sent. (N.I.T.)
5. List of parties to whom the enquiry was sent.
Kindly acknowledge receipt of the above documents and
confirm that they are in order.
Thanking you,
Yours faithfully#
B. D. BALIA )Jr. Engineer ( Material Expn.)
Encl,- as above.
THE FERTILIZER CORPORATION OF INDIA LiMITED(GOVERNMENT OF INDIA UNDERTAKING)
Teiagrams : 'FZATItLZER, (TkOiQ AY EXPANSION)
Leg r m s A Y - 7 4 . B O M B A Y . 7 4 , ( A S )Phone: 522267
521451
Our Ref. No. I e
C > 433,
Attn- To2r:ctor to ti, Ind.ia ~Project De acrtontT y IV
rub :-bjct wie are ororore
tor
5t r z zrztc toth \Toa t r r-cuitYour tha folowingdlcy.
3. One Jr. :nrt jorcer
-t; ot they ZQ inOrr.;~J
CUOVO, gyou
ourN ituly
7,. FER TILIZER CORPORATION OF INDIA ivMi T ED(GOVERNMENT OF INDIA UNDERTAKING)
(TROMBAY EXPANSION)Telvgrams: 'FUTaJLZER' BOMBAY -74. (AS)
BOMSAY -74. Phone: 522267
52 451
Our Ref. No. 19
'V. International. Bark for re-constructionQ Development,
K2 H. Stutt 14. W. Washington,:. C. 20 433,
Attn:- Tortorclla, Indvstrial Project DoDartmc.tTra - V.
Sub :- Did Summary for our order -A'
D.r sirs,
With reference to the above subject we are enclosing
rcwith the following documents;-
1. Did summairy (for,: No. 384)
2. comittee s rccommendation along with compzarativestatement.
3. One copy of the order.
4. One copy of our enquiry sent. (.I.T.)
S. ListC of parties to whom the enquiry was soent.
Xindly acknowledge receipt of the above documat.s rndconfirm that they are in order.
Thanking you,
Yours faithfully,
B. D. 13AIIGA)Jr. Engineer ( material zxpn.)
Einci:- as above.
JN 1975
T FERTILIZER CORPORATION OF INDIA LIMITED(GOVERNMENT OF INDIA UNDERTAKING)
(TROMAY EXPANSION)Te'egrams: dFER'iflLZER' BOMBAY-74. (AS)
6OMBAY .74. Phone: 522267521451
Our Ref. No. N2/-1/ CO1O _A ;_ 9
s. International Dank for re-construction& Development,
4. $tutt M.W. Washington,!.C. 20 433,
Attn:- Tortorclli, Industrial Project DcpartmnntTrombay - IV.
Sub :- i Summ ry for our order rTQ
Dcar Sirs,
With reference to the above subject we are enclosing
herewith the following docuents:-
1. Did zummary ( Eorm *o. 334 ).2. committee' s recommendation along with compaxttive
statement.
3. One copy of the order.
4. One copy of our enquiry sent. (N.1T.)
5. List of parties to whom the enquiry was sent.
Kindly acknowlc(dg receipt of the above documents and
confiri that they are in order.
Thanking you,
Yours faithfully,
( B. D. BALIGA )Jr. Engineer (material Effip.
- as above.
J JUN -9T
-r..TFERTILIZER CO.OATION 0F INDIA LIMITED(GOVERNMENT OF INDIA UNDERTAKING)
(TROMAY EXPANSION)Telegrams : 'FE RT BOMAY -74.(A)
Phone: 522267BOMIBAY -74. 45521451
Our Ref. No. / f t u -
rnu rnationl J.nk Lor rconstiructionl
S>tut~t V. W . Wasington,
Trom**1 -
3ub "~ id .2 Eor Our crd r
With recnco to th !b:vXC ZubjoCt wC ar- C
eththe ty I ll;wingd,,ct
2. Com~ic~tcz rcco a .c&tion along wlth comparatiVc
3. One copy o2 the o2dcr.
4. one copy o. ' inqiry sent. (i.I.T.)
5.Ls -w partie .o whom tho onquiry was con
Kindly' acknowlKd c rcelipt oZ .h abov0 u a..
. ha they are o rcr.
Thianking -you,
Yours faitully,
Jr. Engjini.er ( atrAl*p.
- LA ab3v.c
7-nKnt 2
7WE ?ERILIZER CORPORATION OF INDIA L MITED(GOVERNMENT OF INDIA UNDERTAKING)
TELEGRAMS: FERTILIZER (TROMBAY UNIT) Marvali, Chembur.PHONE: 52 145 I BOMBAY 400 074,
Our Ref. No. PXT/33/10019 Bombay, Dated the 12th June, 19 75
U/s Industrial Bank for Reconstruction & Development(The Industrial Project Department)1818, H Street,A.W. Washington DC 80433U.S.A
Dear Kind Attn: Mr Tortorelli
Sub: Details of Tender for Conveyor Beltingrequired for product handling system.
006
We forward enclosed herewith the following documents for
your kind information and record regarding procurement of conveyor
belts for our Trombay Expansion Project.
The order for this material has already been released in
favour of the lowest tenderer M/s Mitsui & Co. Ltd., Tokyo, Japan
on 26-4-1975.
You are requested to kindly process the withdrawl application
received in respect of this order
(.) 1 set.of Tender Documents
(ii) 1 set-List of parties
(iii) 1 set.Bid Summary and comparative statement with form 384.(iv) 2 set-Purchase Order.
Kindly acknowledge
Thanking you, Yours faithfully,
(S.C. De Baksieneral Project Manager.
Encl: As above./
S. C. DE BAKSI j The Fertilizer Corporation of India Ltd.General Project Manager Trombay 074.
Bombay-400 074.
No. Expn/1(59)/c/75 152 - 12th June, 1975.
13
Dear Mr. Tortorelli,
On receipt of your telex of June 11, 1975, I have arranged to sendthe following bid packets and summaries to-day.-
Order No. Item1. PXZ/13/10012 < ,Mixed Gas Filter M'''?
2. PXZ/13/10013 , IW A Filtering Candles - ;49, 74r
3. PIZ/13/10014 N Heat Exchangers P/7 oIV /5'
4. PXZ/13/10014-A- / \ Tailgas Preheater -z , 4,ok
5. PXZ/13/1018 >1 N Pumps & Spares
6. PXZ/13/10027 k... \Drop Separator, etc.7. PXZ/1 3/10016 ,- - Tanks r>- >4, re'
8. PXT/33/1oo19' "i"w4Z \Conveyor Belting. /, 3-11,9. PXZ/13/10023 ?"< ,Heat Exchangers Prit-,7 710
10. PXZ/13/10017 ' C/ #, Ammonia Compressor 0 , 3 O
11. PXZ/1/10015 ' V *-Turbo Air Compressor with pt" S f7,0Steam Turbine & Expansion Set.
12. PXZ/1 3/10040 / A ide . Nitric Acid Storage Tanks. A -13. PXZ/13/10058 -, Nitric Acid Pumps . D,' - O
14. PXZ/13/10078 g ea -. , Ammonia Evaporation Unit >A;,
15, P x ./13 to 4 /, CAm A NV W Z C62 IV &* Z" Ov' sKindly expedite your confirmation to the banks. It is apparent
that our earlier letters with bid packets might have got loston the way.
Kindly confirm that you have received all the bid summaries
as listed above.
With regards,Yours sincerely,
( S.C. De Faksi )Mr. E.Tortorelli,Industrial Projects Department,International Bank for Reconstruction and Development,1818 H, Street, N.W.,Washington D.C. 20433,U.S.A.
7(Telex Nr.) INCCK1MG T~
From: Bombay -
q75JtU 12 07Distribution:
Industrial Proj.Mr. Kraske
--- - - -- - - -- - - -- .-- ----- -
1 -
< 1 -
* - - -
* . -.. ..- --...
2' I
INTERNATIONAL DEVELOPMENT INTERNATiONAL BANK FOR INTERNATNAL NNCASOCIAUON RECONSTRUClON ANDDEVELOPMENT CORPORATI
OUTGOING WIRE
TO: FERTILIZER CORPORATION OF INDIA LTD. DATE. June 12, 1975TRMBAY UNITBOMBAY
SERVICEExt. 6666
COUNTRY:
TEXT: FOR DEBAKSI . PE IFJY/12/10073 REACTORS WITH SERUBBERS iE AvE 110Cable No,:
OBJECTION AWARDING CONTRACT TO MITSUBISHI.
SREGARDS
TORT'ORELLTINTBAFRAD
NOT TO BE TRANSMITTED
AUTHORIZED BY: CLEARANCES AND COPY DISTRIBUTION:cc: Messrs. Fuchs
NAME E. Tortorelli DeweyPerram, Shet by
DEPT. Industria Projectx Departmen - - spiritu (1sRobbin (1s)/- F530
SIGNATURE(SltrtzAIURE 0 .F JNDIVIDUAL AUTHORtZED To APPROVE,
REFERENCE: Fspiritu/om - For Us By mit VSion
ORIGINAL (File Copy)(IMPORTANT: See Secretaries Guide for preparing form) Checked for Dispatch: ---------
Formn No. 27(370)
INTERNATIONAL DEVELOPMENT INTERNATIONAL BANK FOR INTERNATNAL INANCEASSOCIATION IRECONSTRUCTIONAND DEVELOPMENT CORPORATIN
OUTGOING WIRE
TO: FERTILIZER CORPORATION OF INDIA LTD. DATE June 11, 1975TROMBAY UNITBOMBAY CLASS OF TELE: 113027
Ext. 6666COUNTRY: INDIA
TEXT: FOR DEBAKSI. FOLLOWING ARE REPEAT OF OURTEL DATED MAY 20,Cable No.:
QUOTE WITHDRAWAL APPLICATIONS RECEIVED FOR FOLLOWING EQUImENT:
PXZ/13/10012 MID GAS FILTER AND SPARES
10013 FILTERING CANDLE$
10014 HEAT EXCHANGERS
10014A TAIL GAS PREHEATER II
10015 TURBO AIR COMPRESSOR WITH STEAM TURBINE AND EXPANSION SET
10018 PUMPS AND SPARES
PROCESSING OF WITIDRAWAL APPLICATIONS FOR ABOVE HELD PENDING RECEIPT BID
PACKAGES AND SUMMARIES STOP WE FEREBY CONFIRM APPROVAL AWARD STEAM GENERATION
PLANT TO BHEL UNQUOTE
PLEASE C01,ENT
REGARDS
TORTORELLIINTBAFRAD
NOT TO BE TRANSMITTED
AUTHORIZED BY CLEARANCES AND COPY DISTRIBUTION:
NAME E. Tortorelli
DEPT. Industrial Projects Department
SIGNATUREAor A EOUA U ay o APPROVE)
REFERENCE:.eir o For Use By Cornrna ions Secton
ORIGINAL (Ri Copy)(IMPORTANT: Soe Secretaries Guide for preparing form) Checked for Dispatch:
T D I4M
Idu strial frojec(PLA Nr) M. Krake
I~ TRAD 64 45
143 a.76 1.6.1975 2-35 P S
FRON: C DEBKSI 3 . ERAL P OJ CT MASER FE~RTILIZE CP 1IA
FTD., BOBAAY SIECT
STOFtTLL
RE YOUF TLA DAT1D it).6.75,. W. E A O T RC IPT 07 YOUTL
3ATA AY 207.. RQO IT iEAT T IE 3Ari TODAY. DI D U 1ARIE
A K 0 'OR ILb 7 . I A !AX 03 TWO. i4ATTRR, U QE T.
0'J
IT ERAL 4145
R 14
Mr. KEraske
VIX~: C0 DE BA Il GE4IEPAL PROJECT MAAEFRIIE OP FiI
LTD., DOI TAY IGIA
FRATTNO TOWPO L
K0 'Y R FE MIA TRY F 'I ANCE, LETT rl .F.55C ) EA(A) 75
DATi E0.4.75 FORWlARDe! OUR APPLI ATION EB. I7-- O D
50:,39,91 .* C0 FO sSUIN QUALI I AGREELE4 TO EIMBRE
DEUITOCiI OAiK GlNANY dAS INTIrAI1hD ThAT THE SAME2 hAS NOT-~ BEEIN
RECEIEYiY ,Hn KI DY EPA)ITE Thi SAC1 A TH PARTY I
PRE>LOd CM? DU1M PAg IT.
4b
RE4 - iR
Jim. 10, 19Th
14r. S. C. shemaChairanThe Fertiier Carwoati4 of India Ltd.New Del3iTndaa
Dear Mr. Sharsa,
T an writing In CeUtaOU with the supervisim aisalon wMhrviaited MGI in Xay 1975 to review the salttm of the Tramkbay 1 po"oet.?irst of a1, let ma vmk very m h for the mooidatii tbhu-SitSLitY ym and Dr. S. K. Mukherjee extn to Mr. 3hetty nd wysalf
dw r stay in Dehl. I Wv)14 als 21k to extend our appreciati=ato Mr. ~Deaka4 far the cooperatien ve had wbile in Bombay.
I bave tho Planux' of aning y a copy of o revised proJecteost es+.=U whic how bom prepard an the baois of the 4nf matiou yo=gave us. You will notdze that the Trcmby IV project ia experanaing a
i=e-I& of 2a%, cowpared to the etimate asde ati the time ofappisa1 in 14AX 1774. We r-ognwa thb the oost increase ban largar
be ewJed by rM=m weUl-amu to afl Of us and outidd of the sntrolof project . aitih as iewrl.d* innflatiAn, etc. Rowever, we areaU too aware at the imprtance of proper n n trul to overlookits effects n the tIvd'1 eaosstdon ct the romjest and an the fnBl cost.
C I would elac like to stross the iuportine w attachto the maim of the project tam and to that and we would appreciate to beinfwmed about the steps you are tain to fill the two posittw of Chief
ngimew and MhAf Mwineer (CMvil) nuder the Project Manager, wbich aevacant at presant as shomn in the TrambeIV XmonthlY Progress RqPEwt ofApril 1975. We undwstand that field activities for Trombay 1T hua notyet reached their ful extent and therefore do not require the fall stuffi"gof the project tea, but we would expect seior positions such s thosementionedI ahoy to be n23Ad by qualfied pOO91e froM the start Ot theproject.
Mr. Sharza -2 -June 10, 1975
Another field where close control can yield appreciable benfltsto the project is in the area of the financial situation of the pro=et inparticular and TrooIzy In general. We wuud therefore like to receivsquarterly and yuarly financil reprt for Trwmbe as agrmed daiung thenegotiatiams.
With 3y best regarda,
L. Totomlliistnar al Projects Departmentb
go: M aars9 Fuc-hsDeweyPerram, ShettyHamilton (Ms) - C514
ETortorel]A/am - Trombsa IV
AKNX 1
TP?01 A Y TV L A fOH PH0TCTAPI T. C T 1' ilk
Revised Trombay EstimateApprais al Estiate (May 1974) As of May 1975
T ocal Foreign Local ForeignCot Cust ( Cot o T'a
F'luippient and Siupplies 520 16.3 i M,3 52.5 180.3 232.8
Spares 2,0 V,7 10,7 11,7 15.9 27.6Freight, Handling, Charges,
Duty and Taxes 52.0 11.0 63.0 90,4 18.8 109.2
Licence Fees, Engineering & Design h.0 23.0 27.0 9.)4 23.0 32.4
Erection & Commissioning 33.0 5.o 38.0 29.8 5.0 34.8
Project Management & Training 10.0 1.0 14.0 10.0 4.0 1L.0
Civil 'Uorks 5L.0 -5.0 68.8 68.8
Sub-total 207.0 18.0 355.0 272.6 2147.0 519.6
Initial Working Capital 12.0 8.0 20.0 35.0 - 35.0
Contingencies: Physical 10.0 8.0 18.0 6.0 4.0 10.0
Price 31.0 22.0 53.0 - - - I/
Employees' Housing Colony 3.0 3.0 11.5 - 4.5
Total Project Cost 263.0 186.0 149.0 318.1 251.0 569.1
Interest During Construction 30.0 30.0 42.5 - 42.5
TOTAL FINANCING REQUIRED 293.0 186.0 479.0 360.6 251.0 611.6
1/ Price contingency is included in irfdividual cost items.
Industrial Projects Departent
ay 1975
Forrm No ' 27
INTERNATIONAL DEVELOPMENT INTERNATIONAL BANK FOR INTERNATIONAL F)NANCEASSOCIATION RECONSTRUCTION AND DEVELOPMENT CORPORAION
OUTGOING WIRE
TO: FERTILIZER CORPORATION OF INDIA LTD DATE: June 10, 1975TRUMBAY UNITBOMBAY CLASS Of TELEI: 113027
SERVICE:Ext. 6666
COUNTRY: INDIA
TEXT: FOR DEDAK3I REURTEL JUNE 10 REGARDING YOUR APPLICATION TO REIBURSE COSTCable No.:
OF TURBO AIR CC?,PRESSOR STOP PLEASE REFER OURTEL MAY 20 ADVISING TIAT
APPLICATIONS FOR ALL EQUI,7-TENT MENTIONED THEREIN HELD PENDING RECEIPT
DID SUIMARIES STOP RECENTLY RECEIVED FOLLOWING APPLICATIONS NOT COVERED
BY BID STYN2-ARIE S
10027 SEPARATOR, OIIDATION TANKS, AIR MIXER
10023 PRE-1EATER
10026 DE-GASING COLUmN
10019 CON VEOR BELTING
TO AVOID UNNECESSARY DELAYS IN PAIKE1T WE REQUEST YOUR SENDING US BID
PACKAGES AND EVALUATION REPORTS OF ABOVE MENTIONED EQUIPMENT.
PLEASE LET US KNOW SOONEST.
REGARDSTORTORELLIINTBAFRAD
NOT TO BE TRANSMITTED
AUTHORIZED BY: CLEARANCES AND COPY DISTRIBUTIOW
Oct Messrs. FuchsNAME E. Tortorelli Dewey
Perram, ShettyDEPT. Industrial Projects Departnent Espiritu (Ms)
Robbin (Ms) - '0SIGNATURE -
NDIV oT APPR(QyE... ...... .....
REFRENCE: ............. or Use By C im a ed ion
ORIGINAL (Fie Copy)(IMPORTANT: See Secretarwf. Guide for preparing form) Ceck for Dispatc
June lo, 1975
Mr. K. C. SharmaChaimanThe Fertiise Corporation of India Ltd.Now DelhiIndia
Dear Mr. Sharma,
I am writing In connection with the supervision aesiosa whichvisited FCI in Xar 1975 to review the atatuB of the Trombiq IV projeet.First of all, let me thank you very mich for th eooperation and thehospitality you and Dr. S. K. *ukherjee exteded to Mr. Shetty and myselfduring our stay in Delhi. I would also like to extend our appreciationto Mr. DeBaksi, for the cooperaticn we had while in Bombay.
I have the pleasure of amding you a copy of our revised projectcost estimate which has been prepared on the baais of th* information youga'. un. You will notice that the Trombey IV prject is *Verinaing awet increase of 28, @oqpared to the estimte made at the time of
appraisal in May 1974. We recognis that the cost increase has lrg*3,been eaused by reasons well-kraen to all of us and outside of the controlof project mangement, such as worldwide infiation, ete. However, we areall too aware of the importance of proper mt tral to overlookits effects n the timely completion of the projest and an the fiual oast.
Consequsntly, I would also like to strese te importane we attsohto the zarmlm of the project team and to that and we would approoiate to beinformed about the steps you are taking to fill the two positions of ChiefEngineer and Chief bnginer (Civil) under the Project Manager, which =revacant at present an shown in the Trambey IV Monthly Progress Report ofApril 1975. We understand that field activities for Tromby IT have notyet reached their full extent and therefore do not require the full taffingof the projeet toam, but we would epect senior positims sugh as thosementioned above to be filled by qualified people from the start of theproject.
Xr. Sham -- 2 - June , 1s75
Another field where close eantrol can yield appreciabl benefitsto the project is in the area of the financial situation of the prejet inparticular and Trambey in general. We wmald therefore like to reeivequarterly and yearly financial report for Traubay as agreed duzing thenegotiations.
With my best regards,
Sincerely,
E. TortorelliInsuttrial Projects Department
cc: Messrs. FuchsDeweyPerram, SliettyHamilton (Ms) - c514
ETortorelliAi - Trombay IV
NTERNA L DEVELOPMENT INTERNATIONAL BANK FOR INTERNATIONAL FINANCEASSOCIATION RECONSTRUCTION AND DEVELOPMENT ORPO"TION
OUTGOING WIRE
TO: FERTILIZER CORPORATION OF INDIA LTD DAT June 4, 1975TROIAY UNITBOMBAYCL
S OF T7 : 5 2SERVICE:Ext
COUNTRY: fINDIA
TEXT: FOR DEBAKSI PRIMO REURTEL OF JUNE 4, 1975 WE HAVE NO COMMENTS TO TECable No.:
PROPOSED AWARD FOR BOILER. SECONDO REF THE SULPHURIC ACID PLANT
MODERNIZATION SCHETE INCLUDED IN TFi PAN1T OPERATIONS IDPROVEMENT
PROGRAM WE WOULD LIKE TO KNOW SOONEST THE SULPHUR DIOIDE CONCENTRATIONS
(MEAN AND AXIUM) AFTER PIPEENTATION AND THE STACK HEIGHT. REGARDS.
TORTORELLIINTBAF1:AD
NOT TO BE TRANSMWTID
AUTHORIZED BY: CLEARANCES AND COPY DISTRIBUTION:Qc Messrs. Kalmanoff
NAME DeweyE.Tortorelli Perram, Shetty
DEPT. Industrial Projects Departnient Espritu (Ms)Rpbbin (Ms) - F530
SIGNATURESIGNATURE OP INDIVIDUAL AUTHORtZED TO APPiovE)
kEFERENCE: INDIA - Trombay F U'*
ETortorelli/om )ORIGINAL (File Copy)
(IMPORTANT: See Secretaries Guide for preparing form) Checked for Dispatch:
INTERNATIONAL DEVELOPMENT INTERNATIONAL BANK FOR INTERNATIONAL FINANCEASSOCIATION RECONSTRUCTION AND DEVELOPMENT CORPORATION
OFFICE MEMORANDUMTO: Messrs. Eustachio Tortorelli & Yemal T. Shetty DATE: June 4, 1975
Industrial ProjectsFROM: J. Tixhon, VPSEH '
SUBJECT: INDIA - Trombay IV - Sulfuric Acid - Ecology
Annex 6, page 1, of your supervision report describes themodernization of the H 2S04 plant. We would like to know what the
S02 concentrations (mean and maximum) will be. If these figuresare not available, what is the stack height?
Thank you for your cooperation.
JT/fb
co: Dr. J.A. LeeMr. O.F. Dewey
I4TCRAD S
S PIALA 113027
IT FRAW 4145 ia is7t
ii ,.17 4.6.1975 12-40 FP!
FO: C EAK GEERAL RjECT K+ WAGE FT1077E CO
WMDIA LT ., BNY
INDIA
TO: I: R1 D WASIMTO UbA
ATTn: MR TORTORALLI
REF OUR ETT P. LXP"/1(53 /C/75 DAE OT. AY 1975 WE AE PLTAS A
TO INF0RM YOU TAAT WE ARE RlEA.ING TdE ORDER FOR 2OILEE FAR ROAY IV
STOP KINDLY aE!D YUUR FORAL APPROVAL.
ITFOHAD G4145
SUPHALA 0113027Q
&OOW* EM44* L. k.
a -r Iv - oe v -197
80M 60Poi rYurt"A"nxw I"Wmo thwod$ istc *t t*E a -4fl gut W* wws24 'n0o taas kmbldt theXM"'M**-- (wn ia saximm mil bp. If Uhmn flim"s
ame Dt - - wh is iA *tmak hmsh
Zhw*k ;xa Jbw Y~s epaet
S. J.A. LVmme. C.?. Egs
THE FERTILIZER CORPORATION OF IND I(GOVERNMENT OF INDIA UNDERTAKING)
(TYROMBAY EXPANSION )Telegrams: 'FERTILIZERE BOMBAY -74. (AS)
BOMBAY -74. S. C. De Bak si Phone: 522267General Pro5ject Man e2 I 451
Our Ref. No. xpn.1(59)EV/75/ j _-5
Dear Mr.Tortorelli,
Trombay IV - Expansion -Monthlv PrOrOss Reoort No.12.
I am enclosing herewith the monthly progress report No.12. The
report includes all the annexures.
With kind regards,
Yours sincerely,
(S.C.De Baksi)
r. Tortorelli,International Development Association,Industrial Project Department,1818 H.StreetN.W.Washington DC 2D433.U. S. A.
Bncl a as above
HJCT t 4 A6^
f'i'Y'M9eVTV34OU 1)C 3433'
1818 H2LteS;bM'luW'lelS beLcivc D6oL'IJJUS
.-.. Wp - TO U~or T~ DA e o IiL T$ OU
~-~iL t-r4OL61TT3
IowpsA IA Ebuan-
D091 '10if i'1
BOW~Y~C ow9VkA4(Y2)
( VOHBVA EXbVI4M)
(COAEK4WEM1J 0 O IY OVODEgiVK1VM
tHE EsI~LIFIEB COIbOBV1IQVl1 CL IMDI
TH(E FERTILUZL -RORATION OF INDIA LIMITEDTEFROA' ERNMENW OF INDIA UNDERTAKING)
(TROMBAY EXPANSION)BOMBAY-74. (AS)
BOMBAY - 74 PhOne: 522267
521 451
Our Ref. N,.. P -AA/ I 'la
/fs International Bank7Dr Rc.construction & Deve1oPmen-'%,
1,, Street, N.W. Weshlfington
D.C. 20433U..
Attns M5r. Tortoralli
Dear Sirs,
Subs Our Order It
pleajse find encloaod herewith a copy of our
above order along with a copy ofour enquiry and list of
parties to whom enquiry was sent* Kindly acknowledge receipt
of these documents and confirm that they are in order.
Thanking you#
Yours faithfully,
B.D. BALIGA
JR, ENGINEER(MATERIALS EXPN.)
Enclis As above
j(oh 'I