TNB BILLS (OWNER) – ENERGY SAVINGS PLAN - My ...

15
Edgenta TMS Sdn Bhd TEEGA @ PUTERI HARBOUR TNB BILLS (OWNER) – ENERGY SAVINGS PLAN Prepared by : David Lim (Community Manager) Task Force : David, Sawal, Bahar & Technicans (Date:16 - 11 - 18)

Transcript of TNB BILLS (OWNER) – ENERGY SAVINGS PLAN - My ...

Edgenta TMS Sdn Bhd

TEEGA @ PUTERI HARBOUR

TNB BILLS (OWNER) – ENERGY SAVINGS PLAN

Prepared by : David Lim(Community Manager)

Task Force : David, Sawal, Bahar& Technicans (Date:16-11-18)

1.INTRODUCTION - OBJECTIVE2.ACTIONS TAKEN SO FAR3.NEXT STEP – ETOU SCHEME4.PROPOSAL TO ADOPT ETOU FOR TEEGA5.CASE STUDY - TOWER A (BLOCK 2)6.SUBSEQUENT STEPS – TO REDUCE USAGE7.CONNECTED LOAD CHARGES – CONCERN8.MORE TO COME….

3

INTRODUCTION

OBJECTIVES :

- COST EFFICIENCY & OPTIMIZATION

- TO PREPARE FOR THE NEXT PHASE OF CLC SURCHARGES

( 4th Yr to 6th Yr )

- TO REDUCE WASTAGE & EXCESS

- ENVIRONMENTAL FRIENDLY

- GREENER COMMUNCAL LIVING @ TEEGA

- VALUE ADDED SERVICES BY TECHNICAL TEAM & MANAGEMENT

#Disclamer : All information provided is based on Teega Mixed Development’s

requirement. (33kV and below)

4

ACTIONS TAKEN SO FAR – WHERE WE ARE?

DATA COLLECTION – TNB BILLS(OWNER) AMOUNT EVOLUTION

Total Bill per month comprise of ;(a) Usage(b) Max Demand Surcharge(c) Connected Load Charge(d) Late Payment Surcharge

2018

Declared Max Demand (kW)

75% Declared MD(kW) Usage

Max

Demand SC CLC SC

Late

Surcharge

SUITES 481.9 RM30,707.82 RM5,120.70 RM867.60 RM573.26

361.425 84,131.00 169.00 102.07

TOWER A 503.58 RM32,526.98 RM5,151.00 RM160.14 RM609.02

377.685 89,115.00 170.00 18.84

TOWER B 517.67 RM24,774.01 RM3,817.80 RM1,404.12 RM425.21

388.2525 67,874.00 126.00 165.19

OFFICE 293.06 RM12,177.13 RM1,818.00 RM424.15 RM200.35

219.795 33,362.00 60.00 49.90

RETAIL 495.5 RM5,041.02 RM2,454.30 RM785.23 RM129.66

371.625 13,811.00 81.00 92.38

RM105,226.95 RM18,361.80 RM3,641.23 RM1,937.50

271.07

188.84

291.19

109.90

173.38

AUG

5

CASE STUDY – 3 MONTHS DATA FOR ANALYSIS

Actions to be taken for the 4 segments;(a) Usage

- To adopt ETOU scheme.- To optimize timers setting.- To convert all to LEDs & Photo-sensor.

(b) Max Demand Surcharge- To distribute power usage as per ETOU’s scheme.- To acquire device/software solutions for limiting max demand.

(c) Connected Load Charge – To reduce the declared max demand to TNB.(d) Late Payment Surcharge – To pay bills on time.

2018

Declared Max Demand (kW)

75% Declared MD(kW) Usage

Max

Demand SC CLC SC

Late

Surcharge Usage

Max

Demand SC CLC SC

Late

Surcharge Usage

Max

Demand SC CLC SC

Late

Surcharge

SUITES 481.9 RM30,707.82 RM5,120.70 RM867.60 RM573.26 RM28,406.49 RM4,757.10 RM969.60 RM511.08 RM28,995.97 RM4,484.40 RM1,046.10 RM0.00

361.425 84,131.00 169.00 102.07 77,826.00 157.00 114.07 79,441.00 148.00 123.07

TOWER A 503.58 RM32,526.98 RM5,151.00 RM160.14 RM609.02 RM30,362.53 RM5,181.30 RM151.64 RM704.50 RM29,167.52 RM4,817.70 RM253.64 RM0.00

377.685 89,115.00 170.00 18.84 83,185.00 171.00 17.84 79,911.00 159.00 29.84

TOWER B 517.67 RM24,774.01 RM3,817.80 RM1,404.12 RM425.21 RM22,201.86 RM3,393.60 RM1,523.12 RM512.89 RM22,440.93 RM4,514.70 RM1,208.62 RM0.00

388.2525 67,874.00 126.00 165.19 60,827.00 112.00 179.19 61,482.00 149.00 142.19

OFFICE 293.06 RM12,177.13 RM1,818.00 RM424.15 RM200.35 RM13,296.59 RM2,514.90 RM228.65 RM237.28 RM11,925.28 RM2,666.40 RM186.15 RM0.00

219.795 33,362.00 60.00 49.90 36,429.00 83.00 26.90 32,672.00 88.00 21.90

RETAIL 495.5 RM5,041.02 RM2,454.30 RM785.23 RM129.66 RM5,409.67 RM1,181.70 RM1,142.23 RM147.98 RM4,854.87 RM2,151.30 RM870.23 RM0.00

371.625 13,811.00 81.00 92.38 14,821.00 39.00 134.38 13,301.00 71.00 102.38

RM105,226.95 RM18,361.80 RM3,641.23 RM1,937.50 RM99,677.12 RM17,028.60 RM4,015.23 RM2,113.73 RM97,384.56 RM18,634.50 RM3,564.73 RM0.00

271.07

188.84

291.19

109.90

271.07

188.84

291.19

109.90

173.38

271.07

188.84

291.19

109.90

173.38 173.38

AUG SEPT OCT

6

WHAT IS ETOU? Extended Time of Use

# Extracted from TNB website

7

Facts : Teega Mixed Development is ELIGIBLE for ETOU. (Off-Peak RM0.281 per kWh, Mid-Peak RM0.357 per kWh & Peak RM0.584) Questions : But how much can we save?

WHAT IS ETOU? Extended Time of Use

Current Flat Rate for Teega : C1 (Perdagangan/Commercial)Usage : RM0.365 per kWhMD : RM30.30 per KWCLC : RM8.50 per KW

PF : 1.5% surcharge of the current bill – for every 0.01 less than 0.85 power factor.3% surcharge of the current bill – for every 0.01 less than 0.75 power factor

8

ETOU CASE STUDY – BLOCK A (2 weeks data)

0

20

40

60

80

100

120

140

0:00 1:00 2:00 3:00 4:00 5:00 6:00 7:00 8:00 9:00 10:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:0023:00

Sunday(28-Oct)

Monday (29-Oct)

Tuesday (30-Oct)

Wednesday (31-Oct)

Thursday(1-Nov)

Friday (2-Nov)

Saturday (3-Nov)

Sunday (4-Nov)

Monday (5-Nov)

Tuesday (6-Nov)

Wednesday (7-Nov)

Thursday (8-Nov)

Friday (9-Nov)

Saturday (10-Nov)

Answer : For Tower A and based on 2 weeks data (interval of 30 minutes resolution), we can save about 6% by adopting to ETOU scheme. Conclusion : Propose to apply for ETOU schemestarting 1st Dec 2018.

9

ETOU CASE STUDY – BLOCK A (2 weeks data)

0.365 0.281 0.365 0.281 0.365 0.281 0.357 0.584 0.365 0.281 0.357 0.584 0.365 0.281 0.357 0.584 0.365 0.281 0.357 0.584 0.365 0.281 0.357 0.584

4351 RM1,588.12 RM1,222.63 4458 RM1,627.17 RM1,252.70 4446 RM1,622.79 1641 1997 808 4230 RM1,543.95 1579 1905 746 4110 RM1,500.15 1515 1849 746 4163 RM1,519.50 1591 1841 731 4191 RM1,529.72 1589 1870 732

-RM365.48 -RM374.47 RM23.13 RM15.50 RM21.32 RM11.72 RM11.87

-23.01% -23.01% 1.43% 0.37% 0.52% 0.28% 0.28%

2-Nov

Friday

30-Oct

Tuesday

31-Oct

Wednesday

1-Nov

Thursday

3-Nov

Saturday

28-Oct

Sunday

29-Oct

Monday

RM1,645.92 RM1,559.45 RM1,521.47 RM1,531.21 RM1,541.59

4446 4230 4110 4163 4191

0.365 0.281 0.365 0.281 0.365 0.281 0.357 0.584 0.365 0.281 0.357 0.584 0.365 0.281 0.357 0.584 0.365 0.281 0.357 0.584 0.365 0.281 0.357 0.584

4306 RM1,571.69 RM1,209.99 4333 RM1,581.55 RM1,217.57 4349 RM1,587.39 1646 1946 757 4441 RM1,620.97 1699 1957 785 4393 RM1,603.45 1656 1963 774 4463 RM1,629.00 1664 2000 799 4425 RM1,615.13 1714 1943 768

-RM361.70 -RM363.97 RM11.95 RM13.54 RM14.70 RM19.21 RM8.67

-23.01% -23.01% 0.75% 0.30% 0.33% 0.43% 0.20%

8-Nov

Thursday

9-Nov

Friday

5-Nov

Monday

6-Nov

Tuesday

7-Nov

Wednesday

10-Nov

Saturday

4-Nov

Sunday

RM1,634.51 RM1,618.14 RM1,648.20 RM1,623.80

4441 4393 4463 4425

RM1,599.34

4349

If taking into account of Diwali Holiday

0.365 0.281

4441 RM1,620.97 RM1,247.92

-RM373.04

-23.01%

6-Nov

Tuesday

14 days data for compilation (28-Nov to 10-Nov)ETOU shall be advantageous for sites which have high activities during weekends and public holidays.

10

MOVING FORWARD ONCE ETOU IS ADOPTED

Step 1 : To understand the consumption profile and work to move the usage out from the peak hours(red) to mid-peak(orange) & mid-peak(orange) to off-peak(green).

Step 2 : Update the timers accordingly for the lightings and pumps. (Bahar & Technicians)

11

TO REDUCE THE USAGE (kWh)

Step 3 : It is crucial to start changing all the CFL bulbs (18W) to LED bulbs(9W) with the same LUX brightness. #RM15 per LED bulb(9W, 4500K, 15000hrs) is an estimation for Philips bulb from LAZADA. ROI to convert all LED bulbs is 5.5months.

Step 4 : Another possible savings is to implement the OFF timing for Common Lightings (40%) and maintain the Essential Lightings (60%) from 12.00am to 6.00am.

For Building 2 (Tower A) : 13

Each Level Corridor lightings 24 30

Per Level No Point

No CFL

Bulb Rating CFL(W) Total Consumption per level(W) Total Consumption(kW) Per Day (kWh) Per Month (kWh) Rate (kWh) Cost per month Sum

Savings

(per month)

Percentage

of savings

34 29 58 18 1044 35.496 851.904 25557.12 RM0.37 RM9,328.35

Implement timers setting for Common lightings 40% (off from 7.30am to 6.30pm = 11hrs) executed on 26th Oct

Essential 19 38 18 684 23.256 558.144 16744.32 RM0.37 RM6,111.68

Common 10 20 18 360 12.24 159.12 4773.6 RM0.37 RM1,742.36 -RM1,474.31 -15.80%

Implement LED Bulbs (9W)

Essential 19 38 9 342 11.628 279.072 8372.16 RM0.37 RM3,055.84

Common 10 20 9 180 6.12 79.56 2386.8 RM0.37 RM871.18 -RM5,401.33 -57.90%

RM7,854.04

RM3,927.02

To be implemented in stages as need to remove ballast from all the PLC fittings

Cost per PLC

LED bulbs

Number of

bulbs

required Total Cost

ROI (months)

with savings

RM15.00 1972 RM29,580.00 5.5

Note : Previously all corridor lightings are on 24 hours.Per level consumption is 1044W which is equivalent to 1.5HP airconditioning.

12

TO REDUCE MAX DEMAND SURCHARGE

Maximum demand (MD) is the highest level of electricity demand recorded by TNB meter during a 30-minute interval in a month. Tariff : RM30.30 per KW

Proposal : - To distribute power usage evenly and to reduce concentration on certain hours.- To obtain devices to measure/monitor the consumption on-line.

Latest 3 Months

2018

2018

Declared Max Demand (kW)

75% Declared MD(kW)

SUITES 481.9

361.425

TOWER A 503.58

377.685

TOWER B 517.67

388.2525

OFFICE 293.06

219.795

RETAIL 495.5

371.625

13

CLC CONCERN (4th to 6th YEAR). CURRENT 3rd YEAR

Concern : Entering into 4th year, it is estimated to have an increase of >150% for the CLC charges. No CLC surcharge on 7th year onwards.

Taking Oct-18’s(3rd year) bill as reference, the total CLC amount is RM3,564.73.Assuming the Max Demand captured is the same for the month of Oct-19 (4th year), the amount shall be RM9,382.15 (163%)

Usage

Max

Demand SC CLC SC

Late

Surcharge

RM28,995.97 RM4,484.40 RM1,046.10 RM0.00

79,441.00 148.00 123.07

RM29,167.52 RM4,817.70 RM253.64 RM0.00

79,911.00 159.00 29.84

RM22,440.93 RM4,514.70 RM1,208.62 RM0.00

61,482.00 149.00 142.19

RM11,925.28 RM2,666.40 RM186.15 RM0.00

32,672.00 88.00 21.90

RM4,854.87 RM2,151.30 RM870.23 RM0.00

13,301.00 71.00 102.38

RM97,384.56 RM18,634.50 RM3,564.73 RM0.00

271.07

188.84

291.19

109.90

173.38

OCT

Max

Demand SCCLC SC

RM1,814.11

148.00 213.43

RM1,858.82

159.00 218.69

RM2,033.65

149.00 239.25

RM1,120.26

88.00 131.80

71.00 RM2,555.31

371.63

RM9,382.15

OCT

(if on CLC 4TH - 6TH YR)

14

CLC CONCERN (4th to 6th YEAR). CURRENT 3rd YEAR

Needs to start saving before entering to the 4th year for the CLC surcharges..

To check with developer / consultant if the declared Max Demand can be altered. With the past 1.5 years data, we should be able to provide a more accurate Max Demand.

CLC charges shall not apply if the Max Demand captured/recorded is higher than 75% of the Declared Max Demand. For eg, to reduce the Declared Max Demand for Suites to 200kW, and 75% shall be 150kW. With proper control and monitoring, as long Max Demand captured is more than 150kW, CLC surcharge shall be waived.

2018

Declared Max Demand (kW)

75% Declared MD(kW) Usage

Max

Demand SC CLC SC

Late

Surcharge Usage

Max

Demand SC CLC SC

Late

Surcharge Usage

Max

Demand SC CLC SC

Late

Surcharge

SUITES 481.9 RM30,707.82 RM5,120.70 RM867.60 RM573.26 RM28,406.49 RM4,757.10 RM969.60 RM511.08 RM28,995.97 RM4,484.40 RM1,046.10 RM0.00

361.425 84,131.00 169.00 102.07 77,826.00 157.00 114.07 79,441.00 148.00 123.07

TOWER A 503.58 RM32,526.98 RM5,151.00 RM160.14 RM609.02 RM30,362.53 RM5,181.30 RM151.64 RM704.50 RM29,167.52 RM4,817.70 RM253.64 RM0.00

377.685 89,115.00 170.00 18.84 83,185.00 171.00 17.84 79,911.00 159.00 29.84

TOWER B 517.67 RM24,774.01 RM3,817.80 RM1,404.12 RM425.21 RM22,201.86 RM3,393.60 RM1,523.12 RM512.89 RM22,440.93 RM4,514.70 RM1,208.62 RM0.00

388.2525 67,874.00 126.00 165.19 60,827.00 112.00 179.19 61,482.00 149.00 142.19

OFFICE 293.06 RM12,177.13 RM1,818.00 RM424.15 RM200.35 RM13,296.59 RM2,514.90 RM228.65 RM237.28 RM11,925.28 RM2,666.40 RM186.15 RM0.00

219.795 33,362.00 60.00 49.90 36,429.00 83.00 26.90 32,672.00 88.00 21.90

RETAIL 495.5 RM5,041.02 RM2,454.30 RM785.23 RM129.66 RM5,409.67 RM1,181.70 RM1,142.23 RM147.98 RM4,854.87 RM2,151.30 RM870.23 RM0.00

371.625 13,811.00 81.00 92.38 14,821.00 39.00 134.38 13,301.00 71.00 102.38

RM105,226.95 RM18,361.80 RM3,641.23 RM1,937.50 RM99,677.12 RM17,028.60 RM4,015.23 RM2,113.73 RM97,384.56 RM18,634.50 RM3,564.73 RM0.00

271.07

188.84

291.19

109.90

271.07

188.84

291.19

109.90

173.38

271.07

188.84

291.19

109.90

173.38 173.38

AUG SEPT OCT

THANK YOUTHANK YOUPlease email [email protected] for more info and data.