Timber Sale Appraisal Dragon Buster Sale AT-341 ... - Oregon.gov

36
District: Astoria Date: May 06, 2015 Timber Sale Appraisal Dragon Buster Sale AT-341-2015-07- Cost Summary Conifer Hardwood Total Gross Timber Sale Value $883,553.36 $1,021.30 $884,574.66 Project Work: ($148,664.00) Advertised Value: $735,910.66 5/11/15 1

Transcript of Timber Sale Appraisal Dragon Buster Sale AT-341 ... - Oregon.gov

District: Astoria Date: May 06, 2015

Timber Sale AppraisalDragon Buster

Sale AT-341-2015-07-

Cost Summary

Conifer Hardwood TotalGross TimberSale Value $883,553.36 $1,021.30 $884,574.66

Project Work: ($148,664.00)

Advertised Value: $735,910.66

5/11/15 1

District: Astoria Date: May 06, 2015

Timber Sale AppraisalDragon Buster

Sale AT-341-2015-07-

Timber Description

Location: Portions of Sections 14, 15, 22, and 23, T5N, R6W, W.M., Clatsop County, Oregon.

Stand Stocking: 60%

Specie Name AvgDBH Amortization (%) Recovery (%)

Douglas - Fir 19 0 97

Western Hemlock / Fir 19 0 97

Maple 14 0 95

Volume by Grade 2S 3S 4S Camprun Total

Douglas - Fir 1,879 568 86 0 2,533

Western Hemlock / Fir 14 4 0 0 18

Maple 0 0 0 7 7

Total 1,893 572 86 7 2,558

Comments: Pond Values Used: 1st Quarter Calendar Year 2015.

Expected Log Markets: Mist, Clatskanie, Tillamook, Forest Grove, Longview, and Garibaldi.

Western redcedar and Other Cedars Stumpage Price = Pond Value minus Logging Cost: $916.37/MBF = $1,185/MBF - $268.63/MBF

SCALING COST ALLOWANCE = $5.00/MBF

FUEL COST ALLOWANCE = $3.00/Gallon

HAULING COST ALLOWANCEHauling costs equivalent to $780 daily truck cost.

Other Costs (with Profit & Risk to be added):100% Brand and Paint: $1/MBF x 2,556/MBF = $2,556Machine Washing for Noxious Weed Compliance = $2,000Log Loader Slash & Landing Piling (includes Move-In and Pile Materials): (see attached appraisal) = $4,455TOTAL Other Costs (with Profit & Risk to be added) = $9,011

Other Costs (No Profit & Risk added):None.

5/11/15 2

District: Astoria Date: May 06, 2015

Timber Sale AppraisalDragon Buster

Sale AT-341-2015-07-

Logging Conditions

Combination#: 1 Douglas - Fir 79.00%Western Hemlock / Fir 79.00%Maple 79.00%

Logging System: Shovel Process: Manual Falling/Delimbing

yarding distance: Medium (800 ft) downhill yarding: Notree size: Mature / Partial Cut (900 Bft/tree), 3-5 logs/MBF

loads / day: 12 bd. ft / load: 4500

cost / mbf: $72.92

machines: Shovel Logger

Combination#: 2 Douglas - Fir 21.00%Western Hemlock / Fir 21.00%Maple 21.00%

Logging System: Cable: Small Tower <=40 Process: Manual Delimbing

yarding distance: Medium (800 ft) downhill yarding: Notree size: Mature / Regen Cut (900 Bft/tree), 3-5 logs/MBF

loads / day: 8 bd. ft / load: 4500

cost / mbf: $158.33

machines: Log Loader (A)Tower Yarder (Small)

5/11/15 3

District: Astoria Date: May 06, 2015

Timber Sale AppraisalDragon Buster

Sale AT-341-2015-07-

Logging Costs

Operating Seasons: 3.00 Profit Risk: 12%

Project Costs: $148,664.00 Other Costs (P/R): $9,011.00

Slash Disposal: $0.00 Other Costs: $0.00

Miles of Road

DirtRock

(Contractor)Rock

(State) Paved

0.0 0.0 0.0 0.0

Road Maintenance:

Hauling Costs

Species $ / MBF Trips/Day MBF / Load

Douglas - Fir $0.00 2.0 4.0

Western Hemlock / Fir $0.00 2.0 3.7

Maple $0.00 2.0 3.5

$5.61

5/11/15 4

District: Astoria Date: May 06, 2015

Timber Sale AppraisalDragon Buster

Sale AT-341-2015-07-

Logging Costs Breakdown

Logging RoadMaint

FireProtect Hauling Other

P/R applProfit &

RiskSlash

Disposal Scaling Other Total

Douglas - Fir

$90.86 $5.78 $5.14 $100.42 $3.52 $24.69 $0.00 $5.00 $0.00 $235.41

Western Hemlock / Fir

$90.86 $5.78 $5.14 $108.57 $3.52 $25.66 $0.00 $5.00 $0.00 $244.53

Maple

$90.86 $5.89 $5.14 $117.00 $3.52 $26.69 $0.00 $5.00 $0.00 $254.10

Specie Amortization Pond Value Stumpage Amortized

Douglas - Fir $0.00 $582.53 $347.12 $0.00

Western Hemlock / Fir $0.00 $483.33 $238.80 $0.00

Maple $0.00 $400.00 $145.90 $0.00

5/11/15 5

District: Astoria Date: May 06, 2015

Timber Sale AppraisalDragon Buster

Sale AT-341-2015-07-

Summary

Specie MBF Value Total

Douglas - Fir 0 $0.00 $0.00

Western Hemlock / Fir 0 $0.00 $0.00

Maple 0 $0.00 $0.00

Specie MBF Value Total

Douglas - Fir 2,533 $347.12 $879,254.96

Western Hemlock / Fir 18 $238.80 $4,298.40

Maple 7 $145.90 $1,021.30

Amortized

Unamortized

Gross Timber Sale Value

Recovery: $884,574.66

Prepared By: Nick Haile Phone: 503-325-5451

5/11/15 6

))))))

))

))

))))

)))))

))

))))

)

))))))

)))) âÑ

âÑâÑâÑâÑâÑâÑâÑâÑâÑâÑâÑâÑ

âÑ

âÑâÑ

âÑâÑ

âÑâÑ

âÑâÑ

âÑâÑ

â Ñâ Ñ

â Ñâ Ñ

â Ñâ Ñ

â Ñâ Ñ

â Ñâ Ñ

âÑ

âÑâÑâÑâÑâÑâÑ

âÑâÑâÑ

âÑ

âÑ

âÑ

âÑ

âÑâÑ

âÑ

âÑ

âÑâÑ

âÑ

âÑâÑ

âÑ âÑâÑ âÑ âÑ âÑ âÑ âÑ âÑ âÑ âÑ

âÑ âÑâÑ

âÑâÑ

âÑâÑ

âÑ âÑâÑ

âÑ

âÑâÑ

âÑâÑ

âÑ

âÑ âÑâÑ âÑ

âÑâÑ

âÑâÑ

âÑâÑ

âÑ

âÑ

âÑ

âÑâÑ

âÑâÑ

âÑâÑ

âÑâÑ

âÑâÑ

âÑ

âÑâÑâÑ

âÑ

âÑ

âÑ

âÑ

âÑ

âÑâÑ

âÑâÑ

âÑâÑ

âÑâÑ

âÑ

âÑâÑ

âÑâÑ

; ;

;;

;;;

;

;

;

;

;

;

;;

;

!R

!R!R!R!R

!R

!R

"J

"J

"J

Buste

r Creek Mainline

Sager Creek MainlineArea 1

15 14

22 23

0 1,000 2,000500Feet

Legend"J Survey Monument!R New Landing Construction; Ground Yarding Area

Cable Yarding AreaNew Road Construction-SurfacedNew Road Construction-UnsurfacedSurfaced RoadUnsurfaced RoadType N StreamsType F Streams

â Ñâ Ñ

â Ñ

âÑ âÑ âÑ âÑ âÑ âÑ âÑâÑ

âÑ

âÑâÑâÑâÑâÑâÑ

Timber Sale Boundary

)))))

))))))))))

)))))

))))))))))

Posted Stream BufferStream Buffer Zone

LOGGING PLAN

Approximate Scale: 1" = 1000'

OF TIMBER SALE CONTRACT NO. 341-15-07DRAGON BUSTER

PORTIONS OF SECTIONS 14, 15, 22, & 23T5N, R6W, W.M., CLATSOP COUNTY, OREGON

Approximate Net Acres MC AcresArea 1 (MC) 69Area 2 (R/W) 4Total Sale Acreage 73