The Home Depot Quality System Audit - * Example Report
-
Upload
khangminh22 -
Category
Documents
-
view
1 -
download
0
Transcript of The Home Depot Quality System Audit - * Example Report
The Home Depot Quality System Audit
* Example Report *
North America +1-813-252-4770
Latin America
+52-1-333-2010712
Europe & Middle-East +49-8122-552 9590
Asia & Asia Pacific +886-2-2832-2990
India
+91-120-4291971
Email [email protected]
www.proqc.com
3
Dear Client,
Pro QC International was engaged to help factory XXXXXXX comply with The Home Depot Supplier
Requirements. The Home Depot was planning to audit the factory and the goal of this engagement was
to ensure that the factory passed the 3rd party audit and became an approved supplier to The Home
Depot.
Pro QC started this project in July 18, 2017, by conducting an Initial Evaluation based on The Home
Depot Quality System Assessment requirements at supplier XXXXXXXXXXXX. The scope of the initial
assessment covered following:
Chapter 1: Product Finish Control
Chapter 2: Paint Compliance
Chapter 3: Packaging Assessment
Chapter 4: Quality System Assessment
The 3rd page of this document, Initial Audit Summary, provides the results of the Initial Assessment,
with level of compliance for each Chapter. The green bar shows the level of compliance with the
requirement while the yellow and red bar show the level of incompleteness and non-compliance with the
requirement respectively.
On August 1, 217, Pro QC established a Corrective Action Plan in sheet Corrective Action Plan Follow-
Up based on the findings of the Initial Assessment conducted on Juy 18, 2017. The sheet presents 31
violations, each describing the content of the Violation, including the corresponding elements of The
Home Depot's requirement, a proposed Corrective Action, target date to complete the corrective action
and actual date of completion.
The Corrective Action Plan was presented to representative members at the factory XXXXXX. Since the
factory did not have any knowledge about the requirements of The Home Depot, it was clear that the
project leader at Pro QC International would have to lead them with coaching, preparation of
documentation, training and monitoring.
The page Documentation is the list of documents Pro QC developed and provided to the factory as
foundation for the system. In total 12 policies, 38 procedures and around 33 record templates were
developed during the phase of coaching.
The project was completed in 6 visits to the factory XXXXXX, each visit had an update of the current
level of completion as described in the page CAP Progress. Photos of evidence of completion were also
added under Photo.
On August 30, 2017, 2 month after beginning, Pro QC International completed corrective action for 31
violations, around 100% of open violations. Pro QC also conducted a pre-audit to ensure that all
members at the factory were ready to receive the final audit from a designated 3rd party audit firm.
The factory XXXXXX was audited by a 3rd part audit firm and got a score of 87% which is sufficient for
the factory XXXXXX to become an approved supplier for The Home Depot.
The Home Depot Compliance Project Rev.
Presentation
The Home Depot QSA 2/49
1
NAME : NAME :
ADDRESS : ADDRESS :
CITY : CITY :
COUNTRY : COUNTRY :
PHONE : PHONE :
FAX : FAX :
Mr./Mrs. Title: Email:
Mr./Mrs. Title: Email:
Mr./Mrs. Title: Email:
C I NCQUALITY SYSTEM ASSESSMENT0.00% 25.00% 75.00%
PACKAGING ASSESSMENT16.67% 16.67% 66.67%
PAINT COMPLIANCE25.00% 12.50% 62.50%
PRODUCT FINISH CONTROL16.67% 0.00% 83.33%
There are serious major issue in this supplier that could impact in your business
The better solution will be to source for another supplier
RECOMMENDATIONS
Systems are effective, you could start or continue business with this supplier
System is acceptable, with minor nonconformities, you could use this
supplier, and keep pushing them to improve it.
System has some major issue, you could temporaly use this supplier and
request immediate corrective action in case of long term business.
AUDIT RESULTS
XXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXX
Pro QC PERSONNEL
XXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXX
SUPPLIER'S PERSONNEL PARTICIPATING
XXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX 2017/3/9 XXXXXXXXX
SUPPLIER'S INFORMATION CLIENT'S INFORMATION
XXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXX
Supplier Name Audit Date Report No.
The Home Depot Compliance Project Rev.
Initial Audit Summary
0.00% 10.00% 20.00% 30.00% 40.00% 50.00% 60.00% 70.00% 80.00% 90.00% 100.00%
QUALITY SYSTEM ASSESSMENT
PACKAGING ASSESSMENT
PAINT COMPLIANCE
PRODUCT FINISH CONTROL
C I NC
The Home Depot QSA 3/49
Auditor's name Open NCF Closed NCF % Man-days
XXXXXX 31 0 0.00% 2
XXXXXX 23 8 25.81% 2
XXXXXX 23 8 25.81% 2
XXXXXX 11 12 52.17% 2
XXXXXX 5 26 83.87% 4
XXXXXX 0 31 100.00% 4
The Home Depot QSA Compliance
XXXXXXXXXXXXXXXXXXX
Revision
3
The Home Depot Compliance
Corrective Action Plan Progress
PRO-032Project Number
Project Type
Client's name
XXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXX Aug, 13
XXXXXXXXXXXX Aug, 1
XXXXXXXXXXXX Aug, 8
Job Number Visit Date
Supplier's Name
Project Leader
Aug, 3
XXXXXXXXXXXX Aug, 16
XXXXXXXXXXXX Aug, 25
XXXXXXXXXXXX
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
Aug, 1 Aug, 3 Aug, 8 Aug, 13 Aug, 16 Aug, 25
Closed NCF Open NCF
The Home Depot QSA 4/49
1
Category Y/N
A Y
A Y
A Y
A Y
A Y
A Y
A Y
A Y
A Y
A Y
A Y
A Y
B Y
B Y
B Y
B Y
B Y
B Y
B Y
B Y
B Y
B Y
B Y
B Y
B Y
B Y
B Y
B Y
B Y
B Y
B Y
B Y
B Y
B Y
B Y
B Y
B Y
B Y
B Y
B Y
B Y
B Y
B Y
B Y
B Y
B Y
B Y
B Y
B Y
B Y
C Y
C Y
SPC 检验数据统计与分析记录
Light boxes, color cards and other management system
Equipment calibration Procedure
Equipment maintenance Procedure
Packaging material sample management system
Swatch color sample update management system
Wood products storage and workplace management regulations
Pest control Procedure
Traceability program for wood products
Color printing package color plate to retain the provisions of the update
Loading Procedure
Paint process control management system
In-coming Appearance color Inspection Specification
XXXXXXXXX
The Home Depot Compliance Project Rev.
Documentation
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
Supplier Name Audit Date Report No.
2017/3/9
A= Policy & Regulation; B = Procedure; C = Record Template
Name English Name Chinese
Management review Record
Internal Audit Record
Porcess Appearance color Inspection Specification
Final Appearance color Inspection Specification
Product monitoring and measurement Procedure
Nonconforming product control Procedure
Data analysis and control Procedure
Corrective and preventive measures control Procedure
SOP for each process
Customer complaint handling Procedure
Continuous improvement procedure
ECN procedure
Supplier Management and review Procedure
Human resource Management Procedure
Production facility configuration and management and work environment control Procedure
Product realization planning control Procedure
Production and service provision of control and confirmation Procedure
Customer property management Procedure
Product protection Procedure
Monitoring and measuring device control Procedure
Customer satisfaction measurement Procedure
Internal audit Procedure
各工序包括包装的作业指导书/规格要求
客户投诉处理程序持续改进制度工程变更程序供应商管理评审程序
设备维修保养程序包材样品管理制度
木制品存放及工作场所的管理规定虫鼠控制程序木制品的追溯性程序
装柜程序油漆过程的控制管理制度进料外观颜色检查管理制度过程外观颜色检查管理制度成品外观颜色检查管理制度灯箱,色卡等管理制度色板色样更新等管理制度
文件控制程序记录的控制程序管理评审程序人力资源管理程序
Control procedure relating to customer processes
Design and development control Procedure
Procurement control Procedure
仪器设备校验程序
彩印类包材色板的更新保留规定
设计和开发控制程序采购控制程序生产和服务提供的控制和确认程序顾客财产管理程序
纠正和预防措施控制程序
产品的监视和测量程序不合格品控制程序数据分析控制程序
产品防护程序监视和测量装置的控制程序顾客满意度的测量程序内部审核程序
Document Control Procedure
Recording Control Procedure
Management Review Procedure
管理评审记录内部质量审核记录
生产设施的配置和管理及工作环境控制程序
产品实现的策划控制程序与顾客有关的过程的控制程序
公司组织架构图品管组织架构图
Quality Manual
Decomposition and evaluation of quality policy and goal
Continuous improvement Team organization Chart
Inspection Standard(IQC, IPQC, FQC)
ISTA1 Testing Standard
质量手册质量方针与目标的分解与测评持续改善小组组织结构图检验标准( IQC, IPQC, FQC)ISTA1 测试标准包装材料的检验规范家得宝包装 SBA
有关油漆铅含量的标准(如 16 cfr 1303)
质量管理体系/控制关键人员职责
Packing material Inspection Specification
THD Packing SBA
Standard about the Lead content of Oil paint(16 cfr 1303)
Quality Management Responsibility
Factory Organization Chart
Quality Organization Chart
The Home Depot QSA 5/49
1
Category Y/N
XXXXXXXXX
The Home Depot Compliance Project Rev.
Documentation
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
Supplier Name Audit Date Report No.
2017/3/9
A= Policy & Regulation; B = Procedure; C = Record Template
Name English Name Chinese
C Y
C Y
C Y
C Y
C Y
C Y
C Y
C Y
C Y
C Y
C Y
C Y
C Y
C Y
C Y
C Y
C Y
C Y
C Y
C Y
C Y
C Y
C Y
C Y
C Y
C Y
C Y
C Y
C Y
C Y
Traceability record for wood products 木制品的追溯性记录Moisture detection records 水分检测记录
Pest control Record 虫鼠控制记录
Swatch color sample list 色板色样清单
Equipment maintenance Plan
包装材料的检验记录包材封样的清单装柜记录
ISTA1 测试记录
Package-like packing list
Loading record
Equipment maintenance Record
Nonconforming product handling Record
Shorten the production cycle plan
Corrective and preventive Record
ISTA1 Testing Record
Inspection record of package material
Exterior color inspection inspector training and assessment records 外观颜色检查检验员的培训和考核记录
ECN record
Supplier review Record
Material Procurement Contract (Contains THD Requirements)
Inspection Record(IQC, IPQC, FQC)
SPC Record
Measuring instrument Calibration Plan
Internal audit failed report
Customer complaint handling Record
Inspection record of First sample piece
New product development record
BOM Sheet
Training Record
Production lead time Record
Controlled list of documents
Document delivery, change, destruction records
Continuous improvement Record(5S, QCC, training etc.)
纠正预防记录
工程变更记录供应商评审记录材料采购合同(包含THD要求规定)检验记录( IQC, IPQC, FQC)检验数据统计与分析记录计量仪器校准计划设备维修保养计划设备维修保养记录不良品处理记录缩短生产周期计划
持续改进记录(如 5S, QCC,培训等)
培训记录出货交期记录首件样品检查记录新产品开发记录BOM 表
内部审核不合格项报告客户投诉处理记录受控文件清单文件收发,变更,销毁记录
The Home Depot QSA 6/49
Project Number
Project Type The Home Depot QSA Compliance
Client's name XXXXXXXXXXXXXXXXXXX
Supplier's Name XXXXXXXXXXXXXXXXXXX
Project Leader XXXXXXXXXXXXXXXXXXX
# SectionViolations:
List violations from last audit report
Corrective Action:
How is the violation should be
addressed?
Status after the visit in
2017-08-30
Corrective
Action
Owner
Close Date
Status
Open=Pendin
g &
Close=Solved
1
Section 2:
Continuous
Improvement
Facility had tracked production plan to
check if it was finished on time, but
the production lead time was not
measured and lead time reduction
plan was not feasible.
Section 2: Continuous
Improvement
Requirements A07
1.Check the real deadline
2.Develop a lead time reduction plan
then put it into effect
3.Train the related workers
The facility has set up realistic lead
time reduction plan; implements
the plan with records.
XXXXXXX 25-Aug-17 Close
The Home Depot Compliance Project
Corrective Action Plan Follow-Up
PRO-032
Revision
3
The Home Depot QSA 7/49
Project Number
Project Type The Home Depot QSA Compliance
Client's name XXXXXXXXXXXXXXXXXXX
Supplier's Name XXXXXXXXXXXXXXXXXXX
Project Leader XXXXXXXXXXXXXXXXXXX
# SectionViolations:
List violations from last audit report
Corrective Action:
How is the violation should be
addressed?
Status after the visit in
2017-08-30
Corrective
Action
Owner
Close Date
Status
Open=Pendin
g &
Close=Solved
The Home Depot Compliance Project
Corrective Action Plan Follow-Up
PRO-032
Revision
3
3Section 3:
Quality System
2) Facility representative claimed that
oral training had been provided for
operators about line stoppage rules
when defective materials were
identified, but relevant training
records were not available.
Section 3: Quality System
Requirements A16
Train the related staff on this issue
Closed since August 30. The
facility has trained the operators
about CAR/CI activities and line
stoppage rules, and maintained
the records.
XXXXXXX 30-Aug-17 Close
The Home Depot QSA 9/49
Project Number
Project Type The Home Depot QSA Compliance
Client's name XXXXXXXXXXXXXXXXXXX
Supplier's Name XXXXXXXXXXXXXXXXXXX
Project Leader XXXXXXXXXXXXXXXXXXX
# SectionViolations:
List violations from last audit report
Corrective Action:
How is the violation should be
addressed?
Status after the visit in
2017-08-30
Corrective
Action
Owner
Close Date
Status
Open=Pendin
g &
Close=Solved
The Home Depot Compliance Project
Corrective Action Plan Follow-Up
PRO-032
Revision
3
5Section 4:
Purchasing
1) Inspection standard was not
established for some incoming
materials (e.g. flannelette and
plasterboard etc.).
2) AQL defined for all inspection
items of password lock was 1.0, but
IQC used AQL(2.5) to inspect the
appearance of password lock. (CCP)
Section 4: Purchasing
Requirements A21
1. Develop the incoming inspection
rules on carpet and fireboard; unified
the sampling standard on e-lock
2. Train the related staff
The facility has established the
inspection standard for flannelette
and plasterboard. In addition, the
facility has trained the IQC
employees about AQL, and
maintained the record.
XXXXXXX 30-Aug-17 Close
The Home Depot QSA 11/49
Project Number
Project Type The Home Depot QSA Compliance
Client's name XXXXXXXXXXXXXXXXXXX
Supplier's Name XXXXXXXXXXXXXXXXXXX
Project Leader XXXXXXXXXXXXXXXXXXX
# SectionViolations:
List violations from last audit report
Corrective Action:
How is the violation should be
addressed?
Status after the visit in
2017-08-30
Corrective
Action
Owner
Close Date
Status
Open=Pendin
g &
Close=Solved
The Home Depot Compliance Project
Corrective Action Plan Follow-Up
PRO-032
Revision
3
7 Section 4:
Purchasing
Some key suppliers (e.g. password
lock supplier: bojiaya etc.) were not
registered in approved supplier
list.(CCP)
Section 4: Purchasing
Requirements A23
1.Assemble the supplier was
mentioned, if it was passed, list it in
supplier list.
2.Train the related staff to identify the
supplier.
Some key suppliers (e.g. password
lock supplier: bojiaya etc.) have
been registered in approval
supplier list.
XXXXXXX 25-Aug-17 Close
8 Section 4:
Purchasing
Facility representative claimed that
process/product change would be
informed by suppliers and facility also
would communicate the change with
customers and get approval, but
relevant implementation records were
not available. (CCP)
Section 4: Purchasing
Requirements A25
1. Explain to the supplier that if they
need to change the product, they
should notify the facility first
2. Train the related staff
3. Purchasing dept. should received
the change letter from suppliers
The facility has updated the
purchasing process. Records
available prove ECN process is
effectively followed.
XXXXXXX 25-Aug-17 Close
The Home Depot QSA 13/49
Project Number
Project Type The Home Depot QSA Compliance
Client's name XXXXXXXXXXXXXXXXXXX
Supplier's Name XXXXXXXXXXXXXXXXXXX
Project Leader XXXXXXXXXXXXXXXXXXX
# SectionViolations:
List violations from last audit report
Corrective Action:
How is the violation should be
addressed?
Status after the visit in
2017-08-30
Corrective
Action
Owner
Close Date
Status
Open=Pendin
g &
Close=Solved
The Home Depot Compliance Project
Corrective Action Plan Follow-Up
PRO-032
Revision
3
10
Section 5:
Inspection and
test- Process
Control
Most operating parameters of
necessary production processes were
well controlled by facility, but the line
speed of the powder coating process
and the shot blasting time of the shot
blasting process etc. were not
effectively monitored and relevant
monitoring records were not properly
documented.
Section 5: Inspection and test-
Process Control
Requirements A30
1.The group leader should supervise
the records
2.Train the staff on importance of the
data
Closed since August 15.The line
speed of powder coating process
and shot blasting time of shot
blasting process etc. have been
effectively monitored and relevant
monitoring records were properly
documented. The facility used the
document to record the first
product and confirmed.
XXXXXXX 15-Aug-17 Close
The Home Depot QSA 15/49
Project Number
Project Type The Home Depot QSA Compliance
Client's name XXXXXXXXXXXXXXXXXXX
Supplier's Name XXXXXXXXXXXXXXXXXXX
Project Leader XXXXXXXXXXXXXXXXXXX
# SectionViolations:
List violations from last audit report
Corrective Action:
How is the violation should be
addressed?
Status after the visit in
2017-08-30
Corrective
Action
Owner
Close Date
Status
Open=Pendin
g &
Close=Solved
The Home Depot Compliance Project
Corrective Action Plan Follow-Up
PRO-032
Revision
3
12
Section 5:
Inspection and
test- Process
Control
IPQC had conducted in-process
inspection for all production
processes, but some inspection
records were not properly
documented, for example:
1) In-process inspection records were
not properly documented for
assembling process.
2) In-process inspection records were
not properly documented for metal
working process on the auditing day.
Section 5: Inspection and test-
Process Control
Requirements A42
1.Check again everyday by group
leader and keep records
2.Train the inspectors
The facility has set up documented
inspection records for assembling
process and metal working
process, and started to maintain
records.
XXXXXXX 30-Aug-17 Close
The Home Depot QSA 17/49
Project Number
Project Type The Home Depot QSA Compliance
Client's name XXXXXXXXXXXXXXXXXXX
Supplier's Name XXXXXXXXXXXXXXXXXXX
Project Leader XXXXXXXXXXXXXXXXXXX
# SectionViolations:
List violations from last audit report
Corrective Action:
How is the violation should be
addressed?
Status after the visit in
2017-08-30
Corrective
Action
Owner
Close Date
Status
Open=Pendin
g &
Close=Solved
The Home Depot Compliance Project
Corrective Action Plan Follow-Up
PRO-032
Revision
3
14
Section 6:
Control of Test
equipment
Facility representative claimed
preventative maintenance had been
conducted for the measuring
equipment and most of them ran in a
good condition, but relevant
preventative maintenance records
were not properly documented.
Section 6: Control of Test
equipment
Requirements A48
1.Perform preventative maintenance
on the equipment mentioned and
keep records
2.Train the staff
The facility developed the annual
equipment preventative
maintenance plan. Moreover the
preventative maintenance records
have been properly documented.
XXXXXXX 30-Aug-17 Close
The Home Depot QSA 19/49
Project Number
Project Type The Home Depot QSA Compliance
Client's name XXXXXXXXXXXXXXXXXXX
Supplier's Name XXXXXXXXXXXXXXXXXXX
Project Leader XXXXXXXXXXXXXXXXXXX
# SectionViolations:
List violations from last audit report
Corrective Action:
How is the violation should be
addressed?
Status after the visit in
2017-08-30
Corrective
Action
Owner
Close Date
Status
Open=Pendin
g &
Close=Solved
The Home Depot Compliance Project
Corrective Action Plan Follow-Up
PRO-032
Revision
3
17
Section 10:
Handling,
Storage,
Packaging, &
Delivery
Some WIPs of shelf manufacturing
process and metal working process
which were stored in workshop were
not identified with necessary
information (e.g. order number,
production stage, quantity and
production time etc.).
Section 10: Handling, Storage,
Packaging, & Delivery
Requirements A61
1.Identify the process label
immediately
2.Train the staff
The WIPs of shelf manufacturing
process and metal working
process which were stored in
workshop have been identified with
necessary information (e.g. order
number, production stage, quantity
and production time etc.). The
facility checked them by 5S.
XXXXXXX 30-Aug-17 Close
The Home Depot QSA 21/49
Project Number
Project Type The Home Depot QSA Compliance
Client's name XXXXXXXXXXXXXXXXXXX
Supplier's Name XXXXXXXXXXXXXXXXXXX
Project Leader XXXXXXXXXXXXXXXXXXX
# SectionViolations:
List violations from last audit report
Corrective Action:
How is the violation should be
addressed?
Status after the visit in
2017-08-30
Corrective
Action
Owner
Close Date
Status
Open=Pendin
g &
Close=Solved
The Home Depot Compliance Project
Corrective Action Plan Follow-Up
PRO-032
Revision
3
19
Section 2
packaging
quality control
capability
Packaging material inspection
specifications were established, but
which only had the material test
requirement and didn’t contain the
performance test requirements.
Section 2 packaging quality control
capability
Requirements B04
1.Inspect the cartons via a
performance test
2.Train the staff
3. Study the HD’s requirements
deeply
The facility has updated the
inspection process and added the
performance test in.
XXXXXXX 25-Aug-17 Close
20
Section 2
packaging
quality control
capability
Standard samples of packaging
structure (e.g. corrugated board of
master carton etc.) were not
established by facility.
Section 2 packaging quality control
capability
Requirements B06
1.Get the standard samples of
packaging structure
2.ensure the sample load in good
environment and marked
3.Study the HD’s requirements
deeply
The facility has established the
standard samples of packaging
structure(e.g. corrugated board of
master carton etc.).
XXXXXXX 25-Aug-17 Close
The Home Depot QSA 23/49
Project Number
Project Type The Home Depot QSA Compliance
Client's name XXXXXXXXXXXXXXXXXXX
Supplier's Name XXXXXXXXXXXXXXXXXXX
Project Leader XXXXXXXXXXXXXXXXXXX
# SectionViolations:
List violations from last audit report
Corrective Action:
How is the violation should be
addressed?
Status after the visit in
2017-08-30
Corrective
Action
Owner
Close Date
Status
Open=Pendin
g &
Close=Solved
The Home Depot Compliance Project
Corrective Action Plan Follow-Up
PRO-032
Revision
3
23D - Paint
Compliance
Lead content requirement was not set
for each individual incoming paint
color (e.g. coating powder etc.) and
each kind of incoming painted
components (e.g. screen printing
products etc.). (CCP)
D - Paint Compliance
Requirements D02/D10
Update the purchase order with
color/ item and component
Closed since August 30. The
facility has updated the purchase
order with color/ item and
component, and the lead content
requirement has been set.
XXXXXXX 30-Aug-17 Close
The Home Depot QSA 25/49
Project Number
Project Type The Home Depot QSA Compliance
Client's name XXXXXXXXXXXXXXXXXXX
Supplier's Name XXXXXXXXXXXXXXXXXXX
Project Leader XXXXXXXXXXXXXXXXXXX
# SectionViolations:
List violations from last audit report
Corrective Action:
How is the violation should be
addressed?
Status after the visit in
2017-08-30
Corrective
Action
Owner
Close Date
Status
Open=Pendin
g &
Close=Solved
The Home Depot Compliance Project
Corrective Action Plan Follow-Up
PRO-032
Revision
3
25D - Paint
Compliance
Production control sheet just defined
the color of coating powder used
during the production, but which didn't
include other information (e.g.
supplier/brand name, model#, and
lead content information etc.). (CCP)
D - Paint Compliance
Requirements D05
Change the production control sheet,
list such information (supplier name,
model# and lead content)
The facility has updated the BOM
list, making sure of the power
information. Moreover the facility
has changed the production
control sheet to include other
information (e.g. supplier/brand
name, model#, and lead content
information etc.).
XXXXXXX 30-Aug-17 Close
The Home Depot QSA 27/49
Project Number
Project Type The Home Depot QSA Compliance
Client's name XXXXXXXXXXXXXXXXXXX
Supplier's Name XXXXXXXXXXXXXXXXXXX
Project Leader XXXXXXXXXXXXXXXXXXX
# SectionViolations:
List violations from last audit report
Corrective Action:
How is the violation should be
addressed?
Status after the visit in
2017-08-30
Corrective
Action
Owner
Close Date
Status
Open=Pendin
g &
Close=Solved
The Home Depot Compliance Project
Corrective Action Plan Follow-Up
PRO-032
Revision
3
27D - Paint
Compliance
Facility just carried out lead content
test for finished goods according to
customer requirements and lead
content sampling test was not set in
finished goods inspection
standards.(CCP)
D - Paint Compliance
Requirements D07/D13
Be certain of THD requirements, do
lead content test every 4 months and
keep the reports.
Closed since August 30. The
facility has maintained the lead
content test report according to
THD requirements. Moreover Lead
content sampling test was set in
Final Quality Check process for
every lot.
XXXXXXX 30-Aug-17 Close
28D - Paint
Compliance
Line clearances have been done for
the changing over of the powder
coating process, but lead content was
not checked for related products after
the changing.(CCP)
D - Paint Compliance
Requirements D08
Testing THD products more than 5
times each year after changing lines,
and keep the reports.
Closed since August 30. The
facility has set up the process
document and ensuring to clear
the painting lines every time after
changing.
XXXXXXX 30-Aug-17 Close
The Home Depot QSA 29/49
Project Number
Project Type The Home Depot QSA Compliance
Client's name XXXXXXXXXXXXXXXXXXX
Supplier's Name XXXXXXXXXXXXXXXXXXX
Project Leader XXXXXXXXXXXXXXXXXXX
# SectionViolations:
List violations from last audit report
Corrective Action:
How is the violation should be
addressed?
Status after the visit in
2017-08-30
Corrective
Action
Owner
Close Date
Status
Open=Pendin
g &
Close=Solved
The Home Depot Compliance Project
Corrective Action Plan Follow-Up
PRO-032
Revision
3
30 E - Product
Finish Control
Inspectors had been validated by a
Munsell Farnsworth test to ensure
that they had enough capabilities to
conduct the color visual check, but
the score was not below 16. (CCP)
E - Product Finish Control
Operation and Awareness
Requirements E07
Retest the inspectors
Update the SOP as required
Closed since August 30. The
facility has trained and retested the
inspectors via a Munsell
Farnsworth test, and the score of
all the inspectors was below 16.
XXXXXXX 30-Aug-17 Close
The Home Depot QSA 31/49
Project Number
Project Type The Home Depot QSA Compliance
Client's name XXXXXXXXXXXXXXXXXXX
Supplier's Name XXXXXXXXXXXXXXXXXXX
Project Leader XXXXXXXXXXXXXXXXXXX
# SectionViolations:
List violations from last audit report
Corrective Action:
How is the violation should be
addressed?
Status after the visit in
2017-08-30
Corrective
Action
Owner
Close Date
Status
Open=Pendin
g &
Close=Solved
The Home Depot Compliance Project
Corrective Action Plan Follow-Up
PRO-032
Revision
3
32 E - Product
Finish Control
Renewing plan was not established
for reference samples which were
used to inspect the surface
appearance and color of necessary
incoming materials, semi-finished
goods and finished goods etc. and
also relevant renewing actions were
not implemented.
E - Product Finish Control
Sample Management
Requirements E11
Marked the sample with item / date
and confirmed person, set up the
process such as who take the charge
of the samples
The facility has established the
sample renewing plan, and color of
necessary incoming materials,
semi-finished goods and finished
goods etc. and also relevant
renewing actions were
implemented.
XXXXXXX 30-Aug-17 Close
The Home Depot QSA 33/49
Project Leader
Client's name XXXXXXXXXXXXXXXXXXX
The Home Depot Compliance Project
Photo Evidence
Project Number
Supplier's Name
PRO-032
Project Type
3
Revision
The Home Depot QSA Compliance
XXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXX
How is was before How it became after correction
Photo 4-1:Approval assessment Record Photo 4-2: Approval assessment Record
Facility representative claimed that oral trainings had
been provided for operators about line stoppage
rules when defective materials were identified, but
relevant training records were not available.
Approval assessment was not conducted for some
key suppliers (e.g. password lock supplier: bojiaya
etc).
Photo 3-1: Training records Photo 3-2: Training records
The Home Depot QSA 35/49
Project Leader
Client's name XXXXXXXXXXXXXXXXXXX
The Home Depot Compliance Project
Photo Evidence
Project Number
Supplier's Name
PRO-032
Project Type
3
Revision
The Home Depot QSA Compliance
XXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXX
How is was before How it became after correction
Facility representative claimed that process/product
change would be informed by suppliers and facility
also would communicate the change with customer
and get approval, but relevant implementing records
were not available. (CCP)
Photo 8-1: ECN processrecord Photo 8-2: ECN record
Photo 7-1: Approval supplier list
Some key suppliers (e.g. password lock supplier:
bojiaya etc) were not registered in approval supplier
list.(CCP)
Photo 7-2: Approval supplier list
The Home Depot QSA 37/49
Project Leader
Client's name XXXXXXXXXXXXXXXXXXX
The Home Depot Compliance Project
Photo Evidence
Project Number
Supplier's Name
PRO-032
Project Type
3
Revision
The Home Depot QSA Compliance
XXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXX
How is was before How it became after correction
1) In-process inspection records were not properly
documented for assembling process.
2) In-process inspection records were not properly
documented for metal working process on the
auditing day.
Photo 12-1: Documented inspection records Photo 12-2: Documented inspection records
Photo 11-1: Identified Label of finished goods Photo 11-2: Identified Label of finished goods
Most finished goods stored in warehouse were not
identified with necessary information (e.g. order
number, quantity, production date and inspection
status etc) to ensure the traceability.
The Home Depot QSA 39/49
Project Leader
Client's name XXXXXXXXXXXXXXXXXXX
The Home Depot Compliance Project
Photo Evidence
Project Number
Supplier's Name
PRO-032
Project Type
3
Revision
The Home Depot QSA Compliance
XXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXX
How is was before How it became after correction
Corrective and preventive action was not conducted
for all rejected key incoming materials (e.g. electric
magnet etc) and relevant records were not available.
Photo 16-1: Corrective and preventive action Photo 16-2: Corrective and preventive action
Some non-conforming and/or idle finished goods
were not identified and stored together with good
ones in finished goods warehouse.
Photo 15-1: Identify the idle finished goods Photo 15-2: Identify the idle finished goods
The Home Depot QSA 41/49
Project Leader
Client's name XXXXXXXXXXXXXXXXXXX
The Home Depot Compliance Project
Photo Evidence
Project Number
Supplier's Name
PRO-032
Project Type
3
Revision
The Home Depot QSA Compliance
XXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXX
How is was before How it became after correction
Packaging material inspection specifications were
established, but which only had the material test
requirement and didn’t contain the performance test
requirements.
Photo 19-1: Packaging material inspection requirement Photo 19-2: Packaging material inspection requirement
Standard samples of packaging structure (e.g.
corrugated board of master carton etc) were not
established by facility.
Photo 20-1: Standard samples of packaging structure Photo 20-2: Standard samples of packaging structure
The Home Depot QSA 43/49
Project Leader
Client's name XXXXXXXXXXXXXXXXXXX
The Home Depot Compliance Project
Photo Evidence
Project Number
Supplier's Name
PRO-032
Project Type
3
Revision
The Home Depot QSA Compliance
XXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXX
How is was before How it became after correction
IQC just carried out random lead content verification
for the incoming paint color (e.g. coating powder etc)
and incoming painted components (e.g. screen
printing products etc). (CCP)
Photo 24-1: the lead report Photo 24-2: the lead report
Lead content requirement was not set for each
individual incoming paint color (e.g. coating powder
etc) and each kind of incoming painted components
(e.g. screen printing products etc). (CCP)
Photo 23-1: Lead content requirement Photo 23-2: update purchase order and BOM
The Home Depot QSA 45/49
Project Leader
Client's name XXXXXXXXXXXXXXXXXXX
The Home Depot Compliance Project
Photo Evidence
Project Number
Supplier's Name
PRO-032
Project Type
3
Revision
The Home Depot QSA Compliance
XXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXX
How is was before How it became after correction
Line clearances had been done for changing over of
powder coating process, but lead content was not
checked for related products after the
changing.(CCP)
Photo 28-1: lead content checked record Photo 28-2: lead content checked record and SOP
Facility just carried out lead content test for finished
goods according to customer requirements and lead
content sampling test was not set in finished goods
inspection standards.(CCP)
Photo 27-1: lead content sampling test documented Photo 27-2: lead content sampling test documented
The Home Depot QSA 47/49
Project Leader
Client's name XXXXXXXXXXXXXXXXXXX
The Home Depot Compliance Project
Photo Evidence
Project Number
Supplier's Name
PRO-032
Project Type
3
Revision
The Home Depot QSA Compliance
XXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXX
How is was before How it became after correction
Standard samples just kept by QC and randomly
placed at the inspection area. Moreover, no
designated area with good condition was established
to store the standard samples.
Photo 31-1: standard samples area Photo 31-2: standard samples area
Photo 32-1:Renewing plan Photo 32-2: Renewing plan and Standard sample
managementprocedure
Renewing plan was not established for reference
samples which were used to inspect the surface
appearance and color of necessary incoming
materials, semi-finished goods and finished goods
etc and also relevant renewing actions were not
implemented.
The Home Depot QSA 49/49